Loading...
HomeMy WebLinkAboutCoastal Systems International, Inc. City of Sunny Isles Beach Professional Engineering Services Request for Qualifications No. 10-04-01 \'" . ~ '~ ;;~:~~j:~. ~;..~.' . - ... \ Prepared for. City of Sunny Isles 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RECEIVED COASTAL MAY 2 6 2"~J Mf) ~ '1- -.oq fM Prepared fry: CITY OF SUNNY .SG.:-' t, OFFICE OF THE CITY CLEKh Coastal Systems International, Inc. 64 South Dixie Highway Coral Gables, FL 33146 ORIGINAL SYSTEMS INTERNATIONAL May 26,2010 COASTAL S"~'" ........ ........ '. " ~ ",., -+, -. .~ - .',.- . ~' .' '. - . '. [, " . COAST AL SYSTEMS INTERNATIONAL, INC. 464 South Dixie Highway. Coral Gables, Florida 33146 Tel: 305-661-3655 . Fax: 305-661-1914 www.coastalsystemsint.com SYSTEMS I ~1 t: R"''''IU:'Ii''1. 294000 May 26, 2010 Mr. Rick Connor, City Manager CITY OF SUNNY ISLES 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RE: CITY OF SUNNY ISLES BEACH REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL ENGINEERING SERVICES RFQ No.: 10-04-01 Ladies and Gentlemen: Coastal Systems International, Inc. (Coastal Systems) is pleased to submit the attached original and four copies of our qualifications in response to the above-referenced contract. This Request for Qualifications (RFQ) includes a summary of the team's experience with the requested types of site/civil projects and key project team resumes in Standard Form 330 format. Professional Registrations are also included. COMPANY BACKGROUND Coastal Systems has an established reputation for planning effective strategies and delivering complex projects. Coastal Systems has helped clients realize their vision by engineering cost-effective solutions in the design of streetscapes and public spaces, coastal structures, marinas, beaches, and other specialized projects. From initial field investigations through regulatory permitting, design and construction, we provide clients with a field-to-finish solution. These projects have been diverse and included urban waterfront park revitalizations, multi-neighborhood greenway connectivity corridors, 1,000 slip marinas, and private island destinations. In addition, the firm provides environmental and regulatory permitting and site investigation services. Projects have been completed throughout Florida, the Caribbean and Central America. Coastal Systems began as a specialized coastal engineering and regulatory permitting firm in South Florida in the mid 1980's. Over the years, the firm has expanded our professional services provided to include: . Civil Engineering . Coastal Engineering . Marine Environmental . Construction Management . Waterfront and Marinas . Regulatory Permitting . Site Investigations . Destination Planning and Development As part of our business growth strategy, Coastal Systems opened a West Palm Beach regional office in 2007. This office is fully staffed to serve clients in South and Central Florida. The company maintains a diversified staff of more than 20 individuals, including specialized Project Managers, Engineers, Marine Scientists, and Surveyors. Our team is dedicated to serving clients with a multi-disciplined approach, while ensuring diligent and personalized service. A truly international mix, our staff represents nine countries with fluency in more than six foreign languages. AREAS OF EXPERTISE Coastal Systems engineering team work closely with diverse project teams to provide engineering services for site development. Paving, grading and drainage design services are provided along with water Coastal, Environmental, Civil Engineering and Management ~lL 1t::J.., SYSTEMS ~ May 26, 2010 City of Sunny Isles Request for Qualifications for Professional Engineering Services RFQ No.: 10-04-01 Page 2 and sanitary sewer services. Working relationships are also maintained with state and local regulatory agencies to facilitate plan compliance with applicable codes and regulations. Coastal Systems is uniquely organized with engineering and permitting staff in-house to address environmental resource and coastal construction permits that may be required. Coastal Systems also has extensive experience in the civil engineering design of pubic parks and open spaces. Coastal Systems works closely with land planners and architects to provide comprehensive designs for public spaces. Recent project experience includes the South Pointe Park project in Miami Beach, which incorporated over 20 acres of public space. In addition, Coastal Systems has been the lead consultant on over five oceanfront pedestrian path projects in South Florida, totaling over 3 miles of paths including associated public spaces, beach access areas, and native dune vegetation improvements. The best civil works project is the one you do not notice because it functions smoothly and seamlessly with the surrounding environment. The Coastal Systems team has a proven track record in completing high quality infrastructure improvement projects that include paving, grading, drainage, water and sewer, landscape and related elements. The Coastal Systems team uses a variety of tools to ensure a positive experience for the various user groups as well as minimization of client costs and maintenance issues. Our dedication to open lines of communication and proven project management strategies reduces the amount of client oversight required and streamlines all phases of project implementation including production of plans, securing permits, and facilitating the bid and construction phase of the process. Coastal Systems has worked with many clients to enhance access to waterfront areas and the public experience of these special environments. These include shoreline stabilization and beautification projects using structural and vegetated design solutions, pedestrian trails and transportation connections, bridges, kayak launch areas, and other park and public area improvements. Coastal Systems has also provided public clients with recommendations for planning and design standards in coastal and waterfront areas to allow appropriate consideration for area-specific issues such as flood and coastal storm vulnerability, endangered species protection, riparian rights and navigational safety. Coastal Systems maximizes the experience of diverse user groups while maintaining sensitivity to stakeholder interests, client costs and maintenance issues. Coastal Systems is an industry leader in marine structure design, including associated shoreline stabilization and utilities infrastructure. Coastal Systems has a proven track record of design experience with all of the technical requirements for docks, overwater viewing platforms, and similar structures. Coastal Systems' engineers understand the harsh marine environment, and proper materials will be specified for marine applications to minimize the maintenance needs. Coastal Systems has designed and permitted several marinas, docks and other mooring facilities for municipal, county and state government agencies. Coastal Systems has conducted environmental and technical feasibility studies for planning purposes, and has subsequently designed and permitted dozens of marinas, shoreline stabilization projects, parks and other recreational enhancement projects over or near the water throughout South Florida. Coastal Systems has extensive experience with projects in Sunny Isles, and recently completed a coastal engineering study under contract with the City in 2008. This study was completed to evaluate the performance of the submerged breakwaters for the Corps of Engineers and to evaluate alternatives for beach stabilization. Coastal Systems has also provided consulting services for the following private projects in Sunny Isles: Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305.661.3655 . Fax: 305.661.1914 Regional Office: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411. Tel: 561.640.1003. Fax: 561-640-1009 "'......"'<;\. .cO.lstalsvstemsint .com- inf()(@coastalsystemsint.com fB SYSTE~S ~ May 26, 2010 City of Sunny Isles Request for Qualifications for Professional Engineering Services RFQ No.: 10-04-01 Page 3 . Sole . La Perla . Jade Beach . Trump Royale, Sonesta and Palace ApPROACH Coastal Systems has established working relationships with several local counties and municipalities. Multiple contracts have been awarded for civil, coastal, and waterfront engineering as well as environmental permitting from the following public sector: . Village of Key Biscayne . Village of Bal Harbour . City of Miami . City of Miami Beach . Miami-Dade County DERM . Miami-Dade County Seaport The Coastal Systems team will utilize project management and delivery methods for the City of Sunny Isles that have been successful with other local municipalities over the years. These strategies have included the following: . Define appropriate scope of services and project implementation plan with schedule. . Conduct Project Kick-off meeting to ensure the City's requirements are identified in the early stages of the project. . Begin the environmental permit application process, if required, as quickly as possible. . Maintain open communication with regular updates to the City. . Involve the City in all agency negotiations throughout the permit process to ensure that City staff hears the agency concerns first-hand. . Prepare Design Development and Construction Documents as the permitting requirements are being confirmed and processed. . Attend City Commission Meetings if necessary to assist City staff with updates on project schedule and implementation. . Assist the City in compiling construction documents to account for the special requirements of the project. . Assist the City in the bidding process and reviewing bids to select a qualified contractor. . Assist the City in providing construction administration to ensure the project is completed in accordance with the plans, specifications and permits. REPRESENTA TIVE PROJECT EXPERIENCE The following project summaries outline Coastal Systems' relevant experience for this contract. Detailed specific project experience with contact information is included in the Standard Form 330's. Sunny Isles Shoreline Stabilization Study, Sunny Isles, Florida Coastal Systems conducted an analysis of coastal processes at Sunny Isles Beach to provide recommendations for future beach management. Long term and storm-induced beach erosion along the 2.5 miles of City of Sunny Isles Beach requires frequent and costly maintenance with beach nourishment. Beach compatible sand sources in Florida are diminishing, and long term stabilization of hot spot areas Corpofdte Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305.661.3655 . Fax: 305-661.1914 Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411. Tel: 561-640.1003. Fax: 561-640-1009 "'''''''''. .coaswsvstemsiot.com- info@coastalsystemsint.com ~ m SYSTEMS ~ May 26, 2010 City of Sunny Isles Request for Qualifications for Professional Engineering Services RFQ No.: 10-04-01 Page 4 and reduction in beach nourishment event frequency overall may be beneficial in maintaining adequate beach width for shore protection and for recreational use. Coastal Systems conducted a comprehensive coastal engineering study for Sunny Isles to evaluate coastal processes along the shoreline of Sunny Isles. Detailed hydrographic surveys of two existing submerged breakwaters were conducted along with beach profiling to provide data for input into the numerical modeling software. Offshore wave statistics were prepared utilizing wave data from 1980-1999 to obtain annual conditions that influence sediment transport. Wave modeling was conducted by utilizing the Danish Hydraulics Institute (DHI) MIKE 21 Spectral Wave (SW) model to simulate offshore waves propagating onshore. This model was coupled with the MIKE-21 Hydrodynamic (HD) model to determine the littoral current generated by breaking waves. The resulting sediment transport was evaluated to identify erosion trends along the shoreline. The numerical modeling results indicated that the north segment is characterized with the highest degree of erosion, while the south section was mildly erosional, and the middle section was relatively stable. Two hot spots were identified in the northern section, and wave focusing results were evaluated. Beach management recommendations were prepared based on the coastal engineering results, and coastal structure concepts were prepared for shore stabilization. Additional beach management recommendations were provided as longer term solutions to reduce erosion rates, mitigate local hot spots, and to extend the life of beach nourishment projects. Trump Redevelopment Project, Sunny Isles Beach, Florida The Trump Redevelopment project consisted of three phases: Trump Palace Condominium, Trump Royale Condominium, and Trump Sonesta Hotel. Trump Palace Condominium consisted of the construction of a 45 story, 278 unit tower with tri-Ievel understructure parking garage, cabanas, swimming pool, spa, water features, hardscape, and landscape/lighting activities. Trump Royale Condominium included the construction of a 45-story, 391 unit tower on a bi-Ievel garage pedestal, swimming pool and spa atop the garage, on-site and off-site dune enhancement activities, and hardscape, landscape, and lighting activities. For the Palace and Royale Condominiums, Coastal Systems obtained the Department of Environmental Protection (DEP) Coastal Construction Control Line (CCCL) Permits as required for structures and activities that cross seaward of the CCCL. Lighting plans were approved by the Florida Fish and Wildlife Conservation Commission as part of the CCCL permit process. Coastal engineering services were provided to determine the anticipated impacts of a 100-year storm event on the structure. This analysis provided the anticipated wave crest height, as well as the eroded profile associated with a 100-year storm event. A Wave Load Analysis was also conducted to provide the wave load forces on vertical walls and columns during a 100-year storm event. Additionally, Coastal Systems provided DEP CCCL permitting services for the Trump Sonesta Hotel to construct a shaded seating area seaward of the hotel and to provide dune enhancement activities, landscaping, and lighting activities on site. The lighting activities/plans were also approved by the Florida Fish and Wildlife Conservation Commission as part of the CCCL permit process. La Perla, Sunny Isles Beach, Florida The La Perla Condominium project consisted of construction of a 42 story, 326 unit superstructure with a multi-level parking base. The beachside pool deck included a free-form swimming pool, circular spa, and multiple metal-framed cabana structures. Additionally, the developer remodeled the adjacent 163rd Street end that acts as a public access point to the beach. Coastal Systems provided environmental permitting as well as coastal engineering services for the project. Specifically, Coastal Systems obtained the Department of Environmental Protection (DEP) Coastal Construction Control Line (CCCL) Permit as required for structures and activities that cross partially or wholly across the recorded CCCL. In addition to the structures noted above, Coastal Systems obtained authorization for excavation and fill, hardscape, landscape, and lighting activities. Lighting plans were approved by the Florida Fish and Wildlife Conservation Commission. Coastal Systems' coastal engineering team prepared a site specific 100-year Corporate Office: 464 South Dixie Highway. Coral Gables, Florid.l33146. Tel: 305-661.3655 . Fax: 305.661.1914 Regional Office: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florid.l33411. Tel: 561.640.1003. Fax: 561.640.1009 ,,""....... .coastalsvstemsint .com- info@coastalsysternsint.com 8CO~TAL ._~-~-:---- ~~ -- " '..... - 1" SYSTE~S ~ May 26,2010 City of Sunny Isles Request for Qualifications for Professional Engineering Services RFQ No.: 10-04-01 Page 5 Storm Analysis that determined the anticipated impacts of a 100 year storm event on the project site/structure. This analysis provided the anticipated wave crest height, as well as the eroded profile associated with a 100-year storm event. Dinner Key Marina- Pier 3 Emergency Repairs, Coconut Grove, Florida Hurricane Wilma damaged a section of Pier 3 at Dinner Key Marina in November, 2005. Coastal Systems assessed the damaged section of pier with engineer-divers, and repairs were designed. The repairs consisted of new 14-inch concrete piling driven to support concrete caps supporting concrete deck slabs. Fiberglass grating was specified to span the utility chase and match the existing Pier 3 structural configuration. Marina utilities were designed to restore service to the 3 slips, including fire protection, shore power and domestic water. The sewage pump-out hydrants were also replaced for connection into the existing vacuum system. Environmental permits were obtained from Miami-Dade DERM, and a Nationwide Permit was obtained from the Corps of Engineers. The repairs qualified for an exemption from the Florida DEP. Coastal Systems also assisted the City by providing technical documentation for the FEMA reimbursement process. Construction plans and specifications were prepared and incorporated into the City's bidding documents. After the construction contract was awarded, Coastal Systems provided construction administration services. The services included special inspection services in accordance with the Florida Uniform Building Code for the piling installation and reinforced concrete. Reports were prepared and processed through the City Building Department. Beachwalk, Miami Beach, Florida Coastal Systems in conjunction with Bradshaw Gill & Associates (the landscape architect), prepared construction documents for an on-grade greenway that connects Lummus Park to the 21 sl Street wooden boardwalk. The beachwalk measures approximately 3,400 feet by 15 feet and connects to five street ends. Adequate ramp slopes and curves were provided to comply with ADA requirements and to accommodate emergency vehicles. Coastal Systems worked closely with the Department of Environmental Protection Bureau of Beaches and Coastal Systems, Dade County Department of Environmental Resource Management and the City of Miami Beach to obtain state and local approval. Extensive public meetings were held to acquire authorization from the riparian upland owners. Civil engineering drawings included grading, paving, and drainage as well as utility service connections and street end designs to extend 17th and 18th Streets. Marine turtle lighting and construction administration services were also provided. North Beach Recreational Corridor (NBRC), Miami Beach, Florida The North Beach Recreational Corridor (NBRC) Project incorporates 15 blocks of eXlstmg neighborhoods and business areas in North Beach. The $6M corridor serves as a connection to businesses, residential areas, schools, parks and beaches. This project energized the coastal development areas between 64th Street and 79th Street by encompassing three open-space parks (Allison, Band Shell and North Shore), Ocean Terrace business district and the Altos Del Mar neighborhood. Coastal Systems was responsible for the planning, design, and regulatory permitting for the project, along with EDA W, a subconsultant for landscape architecture and urban planning. Preliminary designs were completed with renderings for public meetings. Construction plans and specifications were prepared for the "Best Value Procurement" process due to the complexity and environmental sensitivity of the project. Construction was completed in early 2009. South Pointe Park, Miami Beach, Florida Coastal Systems provided civil engineering and coastal/environmental permitting services as part of the multi-disciplined design team lead by the landscape architectural firm Hargreaves Associates. Coastal System designed the stormwater management for the 19-acre site, which included a system of drainage retention areas in conjunction with deep water injection wells to prevent any runoff into the bay and inlet. Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305.661.3655 . Fax: 305-661.1914 Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411. Tel: 561-640.1003 . Fax: 561-640-1009 \\ "V."'\\" .coastalsvslt"msint.come info@coastalsystemsint.com rn m- ~"~&~"~~~':4~ May 26,2010 City of Sunny Isles Request for Qualifications for Professional Engineering Services RFQ No.: 10-04-01 Page 6 The drainage design was completed in close coordination with the landscape architects to ensure the design vision was maintained throughout the project. Potable water and sanitary sewer services to the park were also designed. Coastal Systems secured coastal construction and environmental resource and National Pollutant Elimination Systems permits for the site from the Florida Department of Environmental Protection (DEP). In addition, the appropriate permits were obtained from the County department of Environmental Resource Management permitting process required extensive coordination with the design team to ensure compliance for the planned park improvements with the stringent coastal and environmental permitting requirements. Lighting plans were processed for the permits that were compliant with the marine turtle protection requirements. Capri South Beach Streetscape, Miami Beach, Florida Coastal Systems provided streetscape design services to improve the right- of-way for 16th Street and Lincoln Terrace street ends as part of the Capri South Beach Project. Capri South Beach encompasses three distinctive buildings on nearly 500 feet of waterfront on Biscayne Bay. The streetscape improvements included decorative pavers along with parking, sidewalks and landscaping to accommodate adjacent residences as part of the overall neighborhood improvements. The Lincoln Terrace street end is approximately 325 feet long and required a 12-inch water main extension. Similarly, the 16th Street extension required an 8-inch water main extension and slip lining of an existing 8-inch sanitary sewer line. Both street ends were low in elevation and adjacent to the bay and presented challenges for the drainage design. Detailed topographic surveys were obtained to determine the drainage areas and an inverted-crown configuration was selected. The drainage improvements included stormwater pumping stations connected to outfalls with associated controls. Bayfront Street Ends, Miami Beach, Florida The City of Miami Beach secured funding from the Florida Inland Navigation District (FIND) to improve waterfront areas at South Shore Drive (Normandy Shores), 10th Street, 14th Street, Lincoln Road and Island View Park. Coastal Systems designed and permitted the bulkheads at all five locations. Hydrographic and marine resource surveys were conducted at all locations to address potential seagrass impacts from the waterfront construction in the sensitive marine environment of Biscayne Bay. Steel sheet piling was specified to be installed directly in front of the existing bulkheads to meet federal and state exemption criteria. The cantilever design also avoided excavation behind the bulkhead alignment. Environmental permits were processed through the U.S. Army Corps of Engineers, Florida Department of Environmental Protection and Miami-Dade County Department of Environmental Resource Management. Coastal System provided streetscape design services for several streets in Miami Beach. These streets include loth Street, Lincoln Road and South Shore Drive on the bay side, along with 17th Street, 18th Street, 20th Street, 32nd Street, 34th Street, 37th Street and 38th Street on the beach side. Design includes paving, grading, drainage, utility design and parking, and striping layout. A landscaped street end park/walkway design was also included for each street. In addition, street end improvements were designed for South Shore Drive, 10th Street and Lincoln Road to improve upland access to the waterfront. Paving, grading, drainage lighting and landscape/hardscape improvements were also incorporated into the bulkhead improvements. Construction was completed for the Island View Bulkhead in 2008, and construction of the Lincoln Road and South Shore Drive in scheduled for 2010. Rickenbacker Causeway Recreational Area, Miami-Dade County, Florida The Rickenbacker Causeway connects Key Biscayne to downtown Miami, crossing historic Virginia Key and the artificial Hobie Island. The Causeway serves as an important transportation corridor, but also has approximately 2.5 miles of recreational shoreline. These popular beaches are favorites for swimming and water sports including kayaking, kite boarding, sailing and wind surfing. Coastal Systems designed the Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661.3655 . Fax: 305.661.19t4 Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411. Tel: 561-640-1003. Fax: 561.640.1009 \\-v.-v." .coJ.swsvstemsint.com- info@coasta}systemsint.com ~ SYSTEMS ~ May 26,2010 City of Sunny Isles Request for Qualifications for Professional Engineering Services RFQ No.: 10-04-01 Page 7 Causeway shoreline improvement project, incorporating shoreline stabilization and upland improvements. Field investigations were completed including hydrographic surveying and beach profiling. Marine resource (seagrass) surveys were conducted, as well as upland native and exotic vegetation mapping. Coastal Systems also provided post-hurricane beach profile survey after the hurricanes in 2005. The field data was utilized to design a beach restoration project that will include upland paving and grading as well as stormwater management improvements. The project combines an extensive upland exotic vegetation removal effort with replanting of native salt-tolerant species. In addition, mangrove planters were designed to enhance the shoreline and protect existing mangrove vegetation. Environmental regulatory permits for the project were processed by Miami-Dade DERM, the Florida DEP and the U.S. Army Corps of Engineers. Coastal Systems prepared construction plans and specifications in conjunction with funding constraints and prioritized project elements established by the County. Coastal Systems has also assisted the County with funding grant applications. Construction will be completed in 2010. Museum Park, Miami Beach, Florida Museum Park is planned by the City of Miami as a waterfront revitalization of the 29-acre park in downtown Miami on the Biscayne Bay. Coastal Systems is part of the multi-disciplined consultant team led by Coopers Robertson and Partners to design the 29-acre Park space. The $45M Park will incorporate a waterfront promenade and baywalk along with fountain, terrace, and plaza elements. Coastal Systems is designing the storm water management which will include a combination of drainage wells with exfiltration trenches along with retention areas coordinated with the design team. An environmental resource permit will be required for the stormwater management system along with FDOT drainage permits. In addition, Coastal Systems designed the water and sewer services for the Park, which includes Miami-Dade Water and Sewer master agreements for the redeveloped Park. Park entry features were also permitted through the FDOT right-of-way program. Hollywood Broadwalk, Broward-County, Florida Coastal Systems assisted the City of Hollywood with environmental permitting for the restoration and improvements to the historic oceanfront Broadwalk located between Sherman and Jefferson Street. At a length of approximately 11,000 feet, the project replaced the 22-foot-wide asphalt material of the existing Broadwalk with decorative pavers-on-sand. An 8-foot-wide concrete bicycle path and a 3- to 5-foot-wide pedestrian walkway consisting of low impact crushed shell material were added to the Broadwalk. The addition of the bicycle and pedestrian lanes expanded the total width of the Broadwalk from 22 feet to 35 feet. Coastal Systems worked closely with the Florida Department of Environmental Protection (DEP) Bureau of Beaches and Coastal Systems, as well as the Florida Fish and Wildlife Conservation Commission and the City of Hollywood in order to secure the required state and local approvals. Coastal Systems assisted the City in demonstrating to the DEP that the project location, materials, vegetation, and other elements would not impose an adverse impact to the beach-dune system. Extensive care was taken to replace existing pole lights that could disrupt nesting or hatchling endangered marine turtles on the adjacent beach with light fixtures that are specially shielded for turtle protection but also preserve the historic character of the Broadwalk and provide sufficient illumination to meet human safety requirements but also preserve the historic character of the Broadwalk and provide sufficient illumination to meet human safety requirements. The Broadwalk is a highly utilized alternative transportation (bicycles, rollerblades, joggers) pathway, as well as an area for people to dine and socialize. Little Haiti Cultural Center, Miami, Florida Coastal Systems provided streetscape design to convert NE 59th Terrace from a two-way road to a one- way road with street parking. Improvements included access to businesses and parking lots, grading and new striping and signage. The improvements were from NE 2nd Avenue to 115 feet beyond NE 3rd Avenue (approximately 800 If). The design of NE 59th Terrace is part of the Little Haiti Cultural Center Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 30S.661.3655 . Fax: 305.661.1914 Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florid.. 33411 . Tel: 561.640.1003 . Fax: 561.640.1009 v. "V."W .cO.lstalsvslemsint.com- info@lcoastalsystemsint.com Etli 6t ~"~~~~~~~'!A~ May 26, 2010 City of Sunny Isles Request for Qualifications for Professional Engineering Services RFQ No.: 10-04-01 Page 8 project funded by the City of Miami and designed by Zyscovich. Coastal Systems also provided water and sewer design for the Little Haiti Cultural Club, Theatre and Parking Lots. New sanitary sewer connections were designed to replace existing lines. Coastal Systems designed drainage systems to manage on-site stormwater runoff. The site drainage design consists of an exfiltration trench system connected by drainage structures. The street drainage design also consists of exfiltration trench connecting 10 drainage structures. Additionally, the stormwater runoff was managed by the design of a complex Retention/Detention System using (6) 48" diameter High Density Polyethylene pipes, 70 feet in length. This drain field is being used to drain the sitelroof area of over one acre, on land with poor soil percolation. Coastal Systems processed the water/sewer system permits through Miami-Dade W ASD and the stormwater plans through Miami-Dade DERM. PROPOSED PROJECT TEAM CREDENTIALS. EXPERIENCE AND ALLOCATION Coastal Systems has assembled a highly qualified team of professionals with demonstrated experience and qualifications in all of the areas of expertise required to plan, design, permit, and administer construction projects. The following summarizes the experience and qualifications of the key personnel that will be assigned to a project. Based on current and projected workloads, these staff members have sufficient time available to dedicate to the successful completion of required project tasks in accordance with the target schedule. An organizational chart and detailed resumes of key personnel with individual representative project experience are included in the enclosed Standard Form 330's. Mr. Timothy Blankenship, P.E. - professional engineer, registered in Florida, has over 15 years experience providing professional consulting services to public sector clients. Mr. Blankenship will be the principal engineer for the contract and will provide high level design and construction strategy, value engineering analyses, opinions of cost, and final quality control of all engineering calculations, technical reports, and engineering plans produced by Coastal Systems. Mr. Andres Perez, P.E. - civil engineer, has over 10 years of civil engineering experience in Miami-Dade County. He has sanitary sewer, water service, stormwater management systems for projects throughout Miami-Dade County. Mr. Orestes Betancourt - civil designer, with over 25 years of site/civil design expenence III South Florida. Mr. Craig McGillawee - project engineer, has over 4 years experience in structural assessment and design. He specializes in the design and specification of marine structures. Environmental/permitting staff who will work on projects under this contract include: Ms. Christy Brush - director of environmental permitting/permitting, has over 10 years of experience with Coastal Systems providing high-level professional consulting services to government clients related to environmental permitting in Florida. Ms. Brush has worked extensively with municipalities such as the City of Hollywood, City of Miami Beach, City of Miami, the Village of Bal Harbour and other public clients to ensure successful implementation of their projects. Ms. Adriana Cabrera - environmental/regulatory permitting project manager, has 5 years of professional experience providing environmental permitting consulting services to clients throughout South Florida. Ms. Cabrera's responsibilities include coordination with the design team and the regulatory agencies Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305.661.3655 . Fax: 305-661.1914 Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411. Tel: 561.640-1003. Fax: 561.640.1009 ""'V.~. .co.1.sulsvstffi1sint.com- info@coastalsystemsint,com !8 SYSTEMS ~ May 26,2010 City of Sunny Isles Request for Qualifications for Professional Engineering Services RFQ No.: 10-04-01 Page 9 relative to the project design plans and other technical/legal data required to efficiently obtain environmental permits. Field Investigation staff who will work on projects under this contract include: Ms. Sandra Rahman - GIS analyst has over 10 years experience and is responsible for processing all field data collected by Coastal Systems for use in analysis, monitoring, and design. Ms. Rahman regularly utilizes Digital Terrain Modeling (DTM) software to generate contour maps and calculate cut/fill volumes for a variety of civil engineering projects. Ms. Rahman is also responsible for providing deliverables in GIS formats. Mr. Aaron Boehning - party chief, has over 12 years of land and hydrographic experience. Mr. Boehning is a licensed Coast Guard captain, and has performed land and hydrographic surveys. SCHEDULING Coastal Systems goal for effective project management is to clearly define scope and fee budget for a project from the beginning, in close conjunction with the City. Roles and responsibilities are clearly conveyed and a project schedule established with milestones. Coastal Systems strives to define the regulatory strategy prior to submitting permit applications through pre-application meetings and an in- depth knowledge of state and federal permitting regulations. COST CONTROL Coastal Systems utilizes the Vision accounting system (Vision) to monitor budgets and weekly staff time postings. The project manager is responsible for reviewing and approving all time posted to a project. Vision provides a web-based environment for project accounting, reporting and tracking providing detailed reports of project progress and budget. The project management reports provide the project manager with real time indicators of percent of fees expended. The project manager can review the budget expended versus the percent of work complete for a particular task. Project invoices are generated directly from the accounting system, and invoices are reviewed by the Project Manager, with final approval by the Department Head to ensure consistency and accuracy. FINANCIAL STABILITY The firm maintains a diverse staff of technical professionals that specializes in coastal and waterfront consulting services. Services are provided for both private and public sector clients, and approximately half of the firm's services are provided for international projects, primarily in the Caribbean and Central America. This balanced clientele allows the firm to adjust to market conditions instead of focusing in certain sectors that are subject to market volatility. Coastal Systems has a balanced, steady 5-year business development and growth management plan. As part of this plan, Coastal Systems is actively marketing public sector, clients such as the City of Sunny Isles. Coastal Systems has provided continually provided services to many public sector clients with multiple contracts for over 10 years. Coastal Systems controlling financial party is Mr. R. Harvey Sasso, his address is 464 South Dixie Highway, Coral Gables, Florida 33146. Coastal Systems is financially stable due to the firm's management practices and long-term growth plans, and will maintain the required staff and support for the City of Sunny Isles. Corporate Office: 464 South Dixie Highway. Coral Gables, Florid.! 33146. Tel: 305-661.3655 . Fax: 305-661.1914 Regional Office: 2047 Vi", Parkway, Suite 101. West Palm Beach, Florid.! 33411. Tel: 561-640-1003. Fax: 561-640-1009 \,\"""w .coJ.stalsvstemsint .com. info@coasulsystemsint.com raCr;r]lO.:STAL -- ~_.~, ~" " ~ c. _ SYSTEMS May 26,2010 City of Sunny Isles Request for Qualifications for Professional Engineering Services RFQ No.: 10-04-01 Page 10 The gross revenues for 2008 and 2009 for Coastal Systems International, Inc. are as follows: Gross Revenues 2008 Coastal Systems International, Inc. $5,784,056 2009 Coastal Systems International, Inc. $3,538,255 COASTAL SYSTEMS PROFESSIONAL LICENSE Coastal Systems International, Inc. has provided professional engineering services throughout the State of Florida since 1995. Please refer to the enclosed Local and Professional Licenses' on the following page. SELECT THE COASTAL SYSTEMS' TEAM Key reasons why to select Coastal Systems for the "As -Needed" Contract: >- Demonstrated Project Experience in Sunny Isles providing consulting engineering services under contract with the City and for private projects within the City >- Miami-Dade Municipal Experience working on task-order contracts for the Cities of Miami and Miami Beach as well as the Villages of Bal Harbour and Key Biscayne in Miami-Dade County >- Regulatory Permitting with dedicated staff that has extensive experience for civil/coastal/waterfront projects involving local, state and federal environmental agencies. These agencies include the U.S. Army Corps of Engineers, Florida DEP, South Florida Water Management District and Miami-Dade DERM. >- Stormwater Management - the firm has over 20 years of experience in designing stormwater management projects in coastal cities with unique urban/coastal drainage challenges and planning for sea level rise. >- Pubfic Involvement - Coastal Systems has prepared and conducted community workshops and presentations to build a consensus of support from agencies, residents, and interest groups. The Coastal Systems' project team looks forward to the opportunity to demonstrate our capabilities and experience to the City of Sunny Isles. Should you have any questions or require any additional information, please do not hesitate to contact me at (305) 66 I -3655. NATIONAL, INC. Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305.661.3655 . Fax: 305-661.1914 Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640.1003. Fax: 561.640.1009 '" ""''''''. .coastalsvstemsint.com- info@coastalsystemsint.com ~~~~ PART I - CONTRACT - SPECIFIC QUALIFICATIONS l lal~el~U:~I'II~I::l:.l:h"B.[em 1. TITLE AND LOCATION (City and State) City of Sunny Isles Beach Request for Qualifications for Professional Engineering Services 2. PUBLIC NOTICE DATE 3, SOLICITATION OR PROJECT NUMBER 04/26/201 0 I 0-04-0 I l 4, NAME AND TITLE Mr. Tim Blankenship, P.E. 5, NAME OF FIRM Coastal Systems International, Inc. 6, TELEPHONE NUMBER (305) 661-3655, ext. 130 m.r.,:[ ~: ,..::( It I!!I =I ~ [~I ~ I =I =I:I:.I:e mr I\!JillIi el ~.,~, It~ 7. FAX NUMBER (305) 661-1914 8, E-MAIL ADDRESS tblankenshi p@coastalsystemsint.com . ...... - . " ... , (Check) w ffiz~ :;; >-,~8t; iI a:CD<.( ll... <t:::> ([ [L(J)f- 9. FIRM NAME 10. ADDRESS 11, ROLE IN THIS CONTRACT a. x B~ Coastal Systems International, Inc. 464 South Dixie Highway Coral Gables, Florida 33146 Coastal/Marine Engineering Environmental Permitting Field Investigations Construction Administration D CHECK IF BRANCH OFFICE b. Coastal Systems International, Inc. ~ CHECK IF BRANCH OFFICE 2047 Vista Parkway, #101 West Palm Beach, Florida 33411 Coastal/Marine Engineering Environmental Permitting Field Investigations Construction Administration c. D CHECK IF BRANCH OFFICE d. D CHECK IF BRANCH OFFICE e. D CHECK IF BRANCH OFFICE 1. D CHECK IF BRANCH OFFICE ,I [!l.lel :[cBm-..,., Uel ~ ,.'L,(~: ,., a ~ :[el:.l:e~ =l1JU.:f.:.!J!JJ ~ (Iti~ l STANDARD FORM 330 (1/2004) PAGE 1 L.U a... 0: ~ '" e OJ ..:L e C1l eo E t= 00 C1l U L.U :s c:L 0 N' ~ OJ C1l CD Q) a... eo Vl Vl OJ ~ -0 ~ ~O E o ~ c V; CUC&Q)~c~ u -g~~]:iE~ ~~ 2~~~,~W~~ >- ~ 0.0 G ....... c ~ ...., rt1 C OJ Vl]Vl C Qj<C E..c~2~~ ~-o ~~ E ~v ~ rc w(u~ ~IVi~:ZS~~8 c~< AAAAAAAAAAA OJ OJ ~ C1l Vl C <lJ .g Vl ::; Qj ~ ~ ~~~-g .~ 1) ~ ~ :Co..i-~ ~ E ~ ~ A AA C1l ~ Qj "'..a 2 C1l eoU >-C1l t;:; e '- e ~ C1l U-o <( <lJ U ::; o '" <lJ c:r: ~ C '" Q) 0.0 t:i E C '" C 0 2 ,- u .;; C LW E c ~ '0 A 00 e .:;;: C1l a... A 00 C U C1l o A OOe e C1l c E ~~ OJ C1l o~ eo C1l e '- ou '- e C1l C1l <(Vl >- <lJ > ::; Vl u ..c Q. '" 50 o Q. o f- A u ..c Q.0Il ~c OJ) f5l'~ ..c -= -:a~~(;::o >-:J Q) '- IVlCOa... A A '" .oL U ceo o 0 0 ro ~ .~ v ~ N .9 ~ ~ Ifl ~ :OG~LI..<lJ<C nj..~ -0 ....c V; 'u Qj c u Q)QJrnrcl:JroV'l ca-~~",~~ Ci)"Vi CD-ru ~QJu o C u 0 '" 5 2 ;7ii:~Ll..20Vi AAAJ'AA OIl c ':6 E Qj a... -' u u u AA OIl c OIl '2 :~ u c ~ & ~,~ a... - N tfJ U'E o <lJ ,- a... 'o.~ Z ct 2 AA c Qj OJ ~ E ~ ~ E ~ o C1l V;~ A c OJ c 0 u o"g '> u V'l ~ 2 c '@ E Ou u<( A LJ..J Q... ci: ...!:: U) C Q) ..Y Q) C ro ~ Cl:l ;:j E ...... U I- ;:j ~ ...... CJ) - ~ c: 0 .- ...... ~ N .- c: ~ OJ:) ~ 0 ...... c: Q) E Q) OJ:) ~ c: ~ ~ <lJ U .~ Vl :s ..c.""'" ~ ~ ~ ~ OIl 50 ~ Q) c 0 i- c '6- ~ ~ ",~~8J~ 2202 A A "0 C '" OIl c c c '" a... c o '';:::::; c '" OIl 00,_ _ Vl ,- <lJ 20 A c .2 ~ :~ c c 0 E 2 "0 <C '" u ._ '00 E 0 Qj 0 a... co AA Qj ~ 3: A OJ u .:;;: Qj OIl Vl C Qj - ~ E ~ ~ c ::- .9 .~ ~ e <C ~ 3: AA Vl 'Vi >- (ij c <C lJ A A '" OIl c c o ",.2 c ,~ g c.2 .~ ~ ~ ~ Q. ro :J ~ U C ~ 'Vi ~ E "'>-0"0 o:t:U<C AAA '" 0 ~ U c c 0 o ~ ~ V; '- c ~ 'E 0"0 u<c A Qj o ..c Vl OIl c :2: -' c o 'c 6 2 .~ ~ E o t:: ULW AA OIl c c o ~ .~ C o.o<lJrc~ ~0l50 (ij~~G V'l c ~= ~ ~ ~ 8: u a... a... <C A A '" .~ '- '- A Vl Q. '" 2 <lJ '" '" co ;;; M ~ i! ",,' ~ "- co E '" Q. "- ~ o ;!: ~ >- ~ ~ g Q. V ~...: ~ c :> ';;; ... E .,.;!: ~ ~ ~ i~~ .- 0 v ~~~ ~.~.~ ~ 0< E E . 0 ~ >.D '-! ~"'T C V'l;:::;.;;; ~t""1E ~~~ 0'- >- u~~ ~. '" :3 ~ J ~ ~ ~ u ~ 1 ot) I "- 'x is "" "5 a .,. '" .,. ~ o "- '" o "- o u ;r~r ~ '\:. ,x' ~~ 12, NAME Timothy K. Blankenship, P.E. 15, FIRM NAME AND LOCATION (Citv and State) ~,',' Coastal Systems International ....' Coral Gables, Florida 16, EDUCATION (DEGREE AND SPECIALlZA nON) M.Sc./Coastal Engineering B.S./Civil Engineering 17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida, Virginia 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Oroanizations. Trainino. Awards. etc.) Mr. Blankenship has over 15 years of experience in the civil and coastal engineering fields. His broad range of experience includes projects involving waterfront facility assessment and rehabilitation design, bridge engineering projects involving structural assessment, structural design and hydraulic analysis/design; land development projects including drainage design and environmental permitting, and construction phase services for several civil projects. PROFESSIONAL AFFILIATIONS Florida Engineering Society, American Society of Civil Engineers (Past-President, Miami-Dade Branch), ASCE Ports and Harbors Committee - Engineer/Diver Standard Task Committee Marinas 2020 Committee PUBLICATIONS "Dune Management on an Urban Coast," T,K, Blankenship, C. Brush and J. Rubin Presented at 2005 FSBPA Conference '"To Repair or Replace a Bulkhead: That is the Question," Marina Dockage, 2004 "Artificial Reef Construction: An Engineered Approach," R, H. Sasso, T.K. Blankenship, S. Higgins, and K, Banks, Feb. 2004, National Conference in Beach Preservation Technology "Mooring Buoys for the Largest Cruise Ship in the World," J. Juhl, R.H, Sasso, T,K, Blankenship, and B. Johansen, Proceedings of Ports 2001 Conference r ......._-......... ""'. "_-.,.r><~~-~ ~ ---. 'mltI:1 ~ 1II=l'/~~ ~. rUi :{;~i:i~ i-"i .-....,"'............-.,-..... ....,.., ] (1) TITLE AND LOCATION (Citv and State) 121 YEAR COMPLETED Bayfront Street Ends Improvements, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (It applicable) 2009 2011 (Est.) a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm Streetscape design for street ends at South Shore Drive, 10th Street and Lincoln Road to improve upland access to the waterfront. Paving, grading, drainage lighting and landscape/hardscape improvements. (1) TITLE AND LOCATION (Citv and State) 121 YEAR COMPLETED Beachwalk, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005 2005 b. (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm Civil/coastal engineering design and environmental permitting for the 4,000 foot on grade paver walkway that connects Lummus Park north to 21st Street in the South Beach district of Miami Beach, along with associated amenities and landscaping. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Capri South Beach, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 2008 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm C. Paving, grading and drainage design for 3 residential complexes with a total 72 units and an underground parking garage next to Biscayne Bay, covering two city blocks. Design included water main extensions for each street, fire, sanitary services, street ends and storm drainage system improvement for the neighborhood with associated pump stations. (1) TITLE AND LOCATION (Citv and State) 121 YEAR COMPLETED Indian Creek Greenway, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 N/A d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm Planning and environmental permitting for pedestrian waterfront recreational corridor extending from 23rd Street to 29th Street along the Indian Creek Waterway. Conducted hydrographic/marine surveys and shoreline stabilization studies. (1) TITLE AND LOCATION (Citvand State) 121 YEAR COMPLETED North Beach Recreational Corridor (NBRC), Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scooe, size, cost, etc,) AND SPECIFIC ROLE [g] Check if project performed with current firm Site/Civil engineering services include paving and grading for 6,700 LF of multi-purpose public access corridor to traverse along the western edge of the beach dunes between 64th Street and 79th Street. Design includes dune e. enhancements, landscaping, electrical and water service for irrigation. 11\ TITLE AND LOCATION fCitv and State) .Jose Marti Park, Miami Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 2008 f. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if proiect performed with current firm Site/civil engineering for 1-acre project site development with a community gymnasium. Paving, grading and stormwater management designs were completed and water/sewer services were provided to the site. Street improvements were designed for Southwest 5th Street. (1) TITLE AND LOCATION (City and State) 12' YEAR COMPLETED Little Haiti Cultural Center, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 2009 g. (3) BRIEF DESCRIPTION fBrief scooe, size, cost. etc.! AND SPECIFIC ROLE [RJ Check if proiect performed with current firm Site/civil engineering for a 1.5 acre site development with a cultural center and theater. Paving, grading and stormwater management designs were completed and water/sewer services were provided to the site including a water main extension. Street imorovements were desianed alonq with three (3) oarkina lots totalina 180 soaces. (1) TITLE AND LOCATION fCitv and State) 10' Vt:AC ~~..n' rTrn South Pointe Park, Miami Beach, Florida PROFESSIONAL SERVICES rONSTRUCTION (If applicable) 2009 2009 h. (3\ BRIEF DESCRIPTION fBrief scooe, size, cost. etc.! AND SPECIFIC ROLE [RJ Check if proiect performed with current firm Civil design and coastal/environmental permitting of a multi-purpose recreational park area for structural, hardscape, and landscape improvements in excess of 16 acres. Activities include the construction of a main park structure with offices/concessionlrestrooms, a storage facility for park vehicles, a raised serpentine walkway, and playground facilities. (1) TITLE AND LOCATION fCitv and State) 10' Museum Park, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing Ongoing (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm i. Design and permitting of mooring dolphin structures as part of 22-acre city park on Biscayne Bay. Sixteen pile-supported dolphin structures provide 750 feet of mooring space within the existing FEC slip to accommodate a variety of ships include tall ships up to 350 feet long. Structures are supported by 24-inch concrete piles with concrete caps providing 50-ton bollards along with fender systems. (1) TITLE AND LOCATION (Citv and State) 12' YEAR COMPLETED Hadley Park, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing N/A j. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm Civil engineering design including ground stabilization for fire truck access, stormwater drainage, water and sewer for a new park pavilion/amenity building within the City of Miami's Hadley Park. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED 10.h Street Auditorium, Miami Beach, Florida PROFESSIONAL SERVICES TCONSTRUCTION (If applicable) 2009 2009 k. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if project performed with current firm Civil design and environmental permitting for the City of Miami Beach's 10th Street Auditorium and Beach Patrol Headquarters. The design included restoration of the two buildings to include new water and sewer service, as well as connections to the adjacent public restrooms. 11\ TITLE AND LOCATION (City and State) 12' YEAR COMPLETED The Clevelander Hotel, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2006 2009 I. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if proiect performed with current firm Civil engineering design and environmental permitting for the renovations including a new drainage system, water and sewer services, and site grading to accommodate the existing adjacent public sidewalks. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Sunny Isles Shoreline Stabilization, Sunny Isles Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 N/A (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm m. Coastal Systems conducted an assessment of local sediment transport characteristics and the potential for shoreline stabilization within the City of Sunny Isles Beach. An evaluation of nearshore coastal processes and sediment transport characteristics in the Project vicinity was completed. Based on the assessment, a long-term beach management plan was prepared for long-term beach planning. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Miami-Dade Truck Haul, Miami-Dade County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 Ongoing n. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if project performed with current firm Design of truck haul nourishment for erosional hot spot at 27th, 44th and 55th streets in Miami Beach with a total of 110,000 cy of sand. STANDARD FORM 330 (6/2004) PAGE 2 12. NAME Andres Perez, P.E. 15, FIRM NAME AND LOCATION (Citv and State) ~,:i,t~ Coastal Systems International :c~'. ,c Coral Gables, Florida IY.TlN. 16, EDUCATION (DEGREE AND SPECIALlZA nON) B.S./Civil Engineering 17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Oroanizations. Trainino. Awards. etc.) Mr. Perez is experienced in all facets of civil engineering design. He has completed storm water management. water and sewer designs for a variety of projects in South Florida and the Caribbean over the last ten years. He has designed projects utilizing digital terrain modeling (DTM) software. He applies these tools to design roadways, earthworks and dredging projects. Mr. Perez completes most of his civil design work in a CAD environment for an efficient transfer of design information to construction plans. PROFESSIONAL AFFILIATIONS Florida Engineering Society, American Society of Civil Engineers r m.r:T:III :l'/~' ~.tI_:.I :{e]llJ ::(~ i (21 YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 I 2011 (Est.) a. (31 BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Streetscape design for street ends at South Shore Drive, 10th Street and Lincoln Road to improve upland access to the waterfront. Paving, grading, drainage lighting and landscape/hardscape improvements. (1) TITLE AND LOCATION (Citv and State) Bayfront Street Ends Improvements, Miami Beach, Florida 12\ YEAR COMPLETED PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) 2005 2005 b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [RJ Check if proiect performed with current firm Civil/coastal engineering design and environmental permitting for the 4,000 foot on grade paver walkway that connects Lummus Park north to 21S1 Street in the South Beach district of Miami Beach, along with associated amenities and landscapinq. (1) TITLE AND LOCATION (Citv and State) Capri South Beach, Miami Beach, Florida (1) TITLE AND LOCATION (Citv and State) Beachwalk, Miami Beach, Florida c. (21 YEAR COMPLETED PROFESSIONAL SERVICES \ CONSTRUCTION (If applicable) 2008 2009 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm Paving, grading and drainage design for 3 residential complexes with a total 72 units and an underground parking garage next to Biscayne Bay, covering two city blocks. Design included water main extensions for each street, fire, sanitary services, street ends and storm drainage system improvement for the neighborhood with associated pump stations. 12\ YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2004 2005 d. (3) BRIEF DESCRIPTION (Brief scooe. size, cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm Paving, grading, and drainage designs for a new residential condominium tower with 195 units as well as hotel renovations. Design included water, fire and sanitary services as well as a drop-off lane on Collins Avenue and 20th and 21 st Street end improvements. (1) TITLE AND LOCATION (Citv and State) North Beach Recreational Corridor (NBRC), Miami Beach, Florida (1) TITLE AND LOCATION (Citv and State) The Setai Development, Miami Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 I 2009 e. (31 BRIEF DESCRIPTION (Brief scooe, size, cost. etc.) AND SPECIFIC ROLE [RJ Check if proiect performed with current firm Site/Civil engineering services include paving and grading for 6,700 LF of multi-purpose public access corridor to traverse along the western edge of the beach dunes between 64th Street and 79th Street. Design includes dune enhancements, landscaping, electrical and water service for irrigation. ~T~n PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) 2008 2008 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm Site/civil engineering for 1-acre project site development with a community gymnasium. Paving, grading and stormwater management designs were completed and water/sewer services were provided to the site. Street improvements were designed for South West 5th Street. 11\ TITLE AND LOCATION (Citv and State I Jose Marti Park, Miami Florida f. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR cnMPLETED Little Haiti Cultural Center, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 2009 g. (3) BRIEF DESCRIPTION fBrief scooe, size, cost, etc,) AND SPECIFIC ROLE 00 Check if proiect performed with current firm Site/civil engineering for a 1.5-acre site development with a cultural center and theater. Paving, grading and stormwater management designs were completed and water/sewer services were provided to the site including a water main extension. Street imnrovements were desinned alonn with three 13\ narkinn lots total inn 180 snaces. (1) TITLE AND LOCATION (Citv and State) '9' South Pointe Park, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 2009 h. (3) BRIEF DESCRIPTION fBrief scooe, size, cost, etc,) AND SPECIFIC ROLE 00 Check if oroiect oerformed with current firm Civil design and coastal/environmental permitting of a multi-purpose recreational park area for structural, hardscape, and landscape improvements in excess of 16 acres. Activities include the construction of a main park structure with offices/concession/rest rooms, a storage facility for park vehicles, a raised serpentine walkway, and playground facilities. (1) TITLE AND LOCATION fCitvand State) FTFn Stormwater Treatment Distribution Area (STDA), Miami-Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida 2003 2007 i. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE 00 Check if project performed with current firm Civil engineering design for an 88-acre basin pump stormwater runoff for treatment from the Homestead Military base utilizing natural wetlands. Design included the pumping station consisting of twin 18,000 GPM pumps, dikes and outfall structures with telemetry for remote control of facility and performance monitoring. (1) TITLE AND LOCATION (Citv and State) '2' YEAR COMPLETED Hadley Park, Miami, Florida PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicabfe) Ongoing N/A j. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE 00 Check if project performed with current firm Civil engineering design including ground stabilization for fire truck access, stormwater drainage, water and sewer for a new park pavilion/amenity building within the City of Miami's Hadley Park. (1) TITLE AND LOCATION (Citv and State) 12) YEAR COMPLETED Coco cay Site Infrastructure Improvements, Berry Islands, Bahamas PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2002 2002 k. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE 00 Check if project performed with current firm Designed site infrastructure and utilities to include fuel handling, R/O water treatment, diesel electrical generation, reclaimed water, solid waste incineration and sewage treatment. Designed heavy earthworks including site grading and drainage. (1) TITLE AND LOCATION (Citv and State) 12'YEARr.nMPLETED 360 Condominiums Site Development, North Bay Village, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 2008 I. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc,) AND SPECIFIC ROLE 00 Check if project performed with current firm Site/Civil engineering design for a 7-acre property development with a total of 378 units, 36 townhouses, and marina. Design included paving, grading drainage including over 1,100 LF of exfiltration trench and 5-drainage wells. Design also includes water/sewer service for four separate buildings. (1) TITLE AND LOCATION (Citv and State) '2' YEAR COMPLETED Museum Park, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing Ongoing m. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [R] Check if project performed with current firm Civil engineering design and regulatory permitting for the 22-acre site. Design included a stormwater management system that combines drainage wells with exfiltration trenches along with retention areas and water and sewer services for the Park, which includes Miami-Dade Water and Sewer master agreements for the redeveloped Park. (1) TITLE AND LOCATION (Citv and State) '2\ YEAR COMPLETED Bluepoints Marina at Port Canaveral, Brevard County, Florida PROFESSIONAL SERVICES TCONSTRUCTION (If applicable) Ongoing 2010 (Est.) n. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE 00 Check if project performed with current firm Civil engineering design included site planning, a stormwater management system, wet detention pond, paving, grading and drainage, water/sewer services as well as new utilities and fire protection. STANDARD FORM 330 (6/2004) PAGE 2 ~. 14, YEARS EXPERIENCE b, WITH CURRENT FIRM 20 12, NAME Orestes Betancourt 15, FIRM NAME AND LOCATION ICity and State) },:~'-'+ Coastal Systems International . \:~ .... Coral Gables, Florida IVITIll. 16, EDUCATION !DEGREE ANO SPECIALIZATION) B.A./Construction Management A.A./En ineerin 18, OTHER PROFESSIONAL QUALIFICATIONS IPublications. Oraanizations. Trainina. Awards. etc,) Mr. Betancourt has over 20 years of experience in site/civil engineering and has completed projects for a variety of sites including hotels, condominiums, marinas, resorts, industrial/commercial areas, and parks. He regularly coordinates with project consultants including architects, engineers and mechanical/electrical/plumbing (MEP) to ensure consistent site/civil design with project requirements. 17, CURRENT PROFESSIONAL REGISTRATION ISTATE AND DISCIPLINE) [ ~::l"'~~.I'li.I:l.~ ] (1) TITLE AND LOCATION ICity and State) /2\ YEAR COMPLETED Bayfront Street Ends Improvements, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 2011 (Est.) a. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc,) AND SPECIFIC ROLE lRl Check if project performed with current firm Streetscape design for street ends at South Shore Drive, 10th Street and Lincoln Road to improve upland access to the waterfront. Paving, grading, drainage lighting and landscape/hardscape improvements. (1) TITLE AND LOCATION ICitvand State) 12\ YEAR COMPLETED Beachwalk, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005 2005 b. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc,) AND SPECIFIC ROLE lRl Check if project performed with current firm Civil/coastal engineering design and environmental permitting for the 4,000 foot on grade paver walkway that connects Lummus Park north to 21 sf Street in the South Beach district of Miami Beach, along with associated amenities and landscaping. (1) TITLE AND LOCATION ICity and State) 12\ YEAR COMPLETED Capri South Beach, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 2009 (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.) AND SPECIFIC ROLE lRl Check if project performed with current firm C. Paving, grading and drainage design for 3 residential complexes with a total 72 units and an underground parking garage next to Biscayne Bay, covering two city blocks. Design included water main extensions for each street, fire, sanitary services, street ends and storm drainage system improvement for the neighborhood with associated pump stations. (1) TITLE AND LOCATION ICity and State) 12\ YEAR COMPLETED Setai Development, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (ff applicable) 2004 2005 d. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc,) AND SPECIFIC ROLE lRl Check if project performed with current firm Paving, grading, and drainage designs for a new residential condominium tower with 195 units as well as hotel renovations. Design included water, fire and sanitary services as well as a drop-off lane on Collins Avenue and 20th and 21 st Street end improvements. (1) TITLE AND LOCATION ICity and State) 12\ YEAR COMPLETED North Beach Recreational Corridor (NBRC), Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 2009 e. 13\ BRIEF DESCRIPTION IBrief scooe, size, cost. etc.! AND SPECIFIC ROLE lRl Check if proiect performed with current firm Site/Civil engineering services include paving and grading for 6,700 LF of multi-purpose public access corridor to traverse along the western edge of the beach dunes between 64th Street and 79th Street. Design includes dune enhancements, landscaping, electrical and water service for irrigation. (1) TITLE AND LOCATION ICitv and State) "n::n .Jose Marti Park, Miami Florida PROFESSIONAL SERVICES I CONSTRUCTION (tf applicable) 2008 2008 f. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.) AND SPECIFIC ROLE lRl Check if proiect performed with current firm Site/civil engineering for 1-acre project site development with a community gymnasium. Paving, grading and stormwater management designs were completed and water/sewer services were provided to the site. Street improvements were designed for Southwest 5th Street. (1) TITLE AND LOCATION ICity and State) 12\ YEAR COMPLETED Little Haiti Cultural Center, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 2008 g. 13\ BRIEF DESCRIPTION IBrief scooe, size, cost, etc.! AND SPECIFIC ROLE [g] Check if oroiect oerformed with current firm Site/civil engineering for a 1.5 acre site development with a cultural center and theater. Paving, grading and stormwater management designs were completed and water/sewer services were provided to the site including a water main extension. Street improvements were designed along with three (3) parking lots totaling 180 spaces. (1\ TITLE AND LOCATION ICitv and State) Iry, . _ -_..- rTr~ South Pointe Park, Miami Beach, Florida PROFESSIONAL SERVICES -\ CONSTRUCTION (If applicable) 2009 2009 h. (3) BRIEF DESCRIPTION IBrief scooe, size, cost etc,) AND SPECIFIC ROLE [R] Check if proiect performed with current firm Civil design and coastal/environmental permitting of a multi-purpose recreational park area for structural, hardscape, and landscape improvements in excess of 16 acres. Activities include the construction of a main park structure with offices/concession/restrooms, a storage facility for park vehicles, a raised serpentine walkway, and playground facilities. (1) TITLE AND LOCATION ICitv and State) lOTIOn Storm water Treatment Distribution Area (STDA), Miami-Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida 2003 2007 i. (3) BRIEF DESCRIPTION (Brief scooe. size. cost. etc,) AND SPECIFIC ROLE [R] Check if project performed with current firm Civil engineering design for an 88-acre basin pump stormwater runoff for treatment from the Homestead Military base utilizing natural wetlands. Design included the pumping station consisting of twin 18,000 GPM pumps, dikes and outfall structures with telemetry for remote control of facility and perlormance monitoring. (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED Hadley Park, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing N/A j. (3) BRIEF DESCRIPTION (Brief scooe. size. cost. etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Civil engineering design including ground stabilization for fire truck access, stormwater drainage, water and sewer for a new park pavilion/amenity building within the City of Miami's Hadley Park. (1) TITLE AND LOCATION (Citvand State) 12\ YEAR COMPLETED 360 Condominiums Site Development, North Bay Village, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 2008 k. (3) BRIEF DESCRIPTION (Brief scooe. size. cost. etc,) AND SPECIFIC ROLE [R] Check if project performed with current firm Site/Civil engineering design for a 7-acre property development with a total of 378 units, 36 townhouses, and marina. Design included paving, grading drainage including over 1,100 LF of exfiltration trench and 5-drainage wells. Design also includes water/sewer service for four separate buildings. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Courts of South Beach, Miami Beach, Florida PROFESSIONAL SERVICES TCONSTRUCTION (If applicable) 2004 2004 I. [R] Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scooe. size. cost. etc,) AND SPECIFIC ROLE Paving, grading and stormwater management design for 400-unit, multi-family development located in the historic South Beach District of Miami Beach. Desiqns also included water mains and sanitary sewer service. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Miramar Gardens Neighborhood Storm water Drainage Improvements, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami-Dade County, Florida 2002 2005 m. [R] Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scooe. size. cost. etc,) AND SPECIFIC ROLE Design of stormwater drainage improvements for subdivision including paving and grading as well as exfiltration trenches. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED The Waverly, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2002 2002 n. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Paving, grading, and drainage designs for a residential complex with 399 units. Design included water, fire and sanitary service as well as a water main extension and street end reconditioning including lighting, landscaping, a City bayfront park and parking spaces. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Cocowalk Drainage Improvements, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2003 2003 o. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [R] Check if project performed with current firm Design of stormwater drainage improvements for lower level garage in Cocowalk. Drainage design included a new deepwater injection well with storm water handling appurtenances to redirect drainage to the new well installed in the City right-of-way. (1) TITLE AND LOCATION (City and State) 12' YEAR COMPLETED Bayfront Amphitheater, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 2009 p. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Site/civil engineering design, including a new stormwater drainage system and sanitary sewer service connections for the restrooms as well as utilities including a new fire line. STANDARD FORM 330 (6/2004) PAGE 2 e 12, NAME Craig McGillawee 13, ROLE IN THIS CONTRACT Waterfront Project Engineer 14, YEARS EXPERIENCE a, TOTAL b, WITH CURRENT FIRM 3 2 15, FIRM NAME AND LOCATION (City and State) ~,"',.' Coastal Systems International '. .~.- Coral Gables, Florida ,VITIM. 16, EDUCATION (DEGREE AND SPECIALIZATION) B.S./Civil Engineering, Minor in Structural Engineering 17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Oraanizations. Trainina. Awards. etc.! Mr. McGillawee has a diverse range of experience in many facets of engineering design and construction management. Mr. McGillawee is responsible for engineering design, project management and construction administration on a variety of projects that include marinas, shoreline stabilization and marine and civil structures. He has designed numerous waterfront structures that include bulkheads, piers, mooring/berthing structures, wave attenuators and 5yncrolift hoist systems. Mr. McGillawee completes most of his design and construction work using a variety of structural and civil software that includes 5T AAD. Pro. and AutoCAD. He is trained and experienced in the use of Primavera Expedition software for construction document management, including: construction plans, shop drawings, site visits, RFl's, and other related documents. [ ~ :t'/~~~. ifir:reJlI :(eji-'i 1 (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Dinner Key Marina, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (/I applicable) 2009 2009 a. (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc.! AND SPECIFIC ROLE [8] Check if project performed with current firm Design and environmental permitting of deck replacement, access gate improvements, and maintenance dredging for 582-slip marina. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Miamarina - Pier 5 Replacement at Bayside, Miami, Florida PROFESSIONAL SERVICES T CONSTRUCTION (II applicable) b. 2009 2009 (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc,) AND SPECIFIC ROLE [8] Check if proiect performed with current firm Assessment, environmental permitting and design of replacement docks for nineteen slips at Pier 5. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Biscayne Bay Yacht Club, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) 2007 2007 c. (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc.! AND SPECIFIC ROLE [8] Check if project performed with current firm Design of 82-slip marina in Coconut Grove consisting of concrete fixed docks. Design of marina utilities. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Bluepoints Marina at Port Canaveral, Brevard County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) 2009 2009 d. (3) BRIEF DESCRIPTION (Briel scope, size. cost. etc.! AND SPECIFIC ROLE [8] Check if project performed with current firm Marina design and environmental permitting for a 10-acre dry storage marina facility, including 940 dry slips, 1 0 wet slips, and 33 launching/holding slips. Hydrographic and marine resource surveys conducted. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Munyon Island Small Boat Docking Facility, Palm Beach County, PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) e. Florida 2004 2010 (Est.) 13\ BRIEF DESCRIPTION IBriel scooe, size, cost. etc,) AND SPECIFIC ROLE [8] Check if oroiect oerformed with current firm Design of floating dock 30-slip marina for day dockage within pile crib breakwater. 11 \ TITLE AND LOCATION ICity and State) I <'T~C\ Rybovich Spencer Boatyard, West Palm Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) 2008 2008 f. (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc,) AND SPECIFIC ROLE [8] Check if project performed with current firm Design of dredging and bulkhead for 150-slip marina redevelopment to accommodate vessels up to 250 feet long. Design of 100,000 cubic yards of dredging and 3,000 feet of bulkhead along with travel lift piers to accommodate 660-ton lift. Coastal engineering analysis for floating structure design. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Fort Myers Boat Club, Fort Myers, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) 2008 2011 (Est.) 13\ BRIEF DESCRIPTION IBriel scooe, size, cost. etc,) AND SPECIFIC ROLE [8] Check if proiect performed with current firm Redevelopment of existing 26-acre marina site for 340 dry slips and 95 wet slips designed for 200 feet of steel and vinyl g. sheet pile bulkhead along with forklift launching platforms and 75-ton travel lift piers. Designed mangrove planters and provided marine environmental compliance monitoring. (1) TITLE AND LOCATION ICitv and State) I?\ V~A" fY)MPI ~T~n Pier 66, Fort Lauderdale, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing Ongoing h. /3\ BRIEF DESCRIPTION IBriel scooe, size, cost. etc,) AND SPECIFIC ROLE [ID Check if proiect pertormed with current firm Design and environmental permitting for 100-slip marina redevelopment. Design of fixed and floating docks to accommodate a diverse slip mix from 60 to 250 feet vessels. Designed marina utilities (shore power, sewage pump-out, fire protection, communications) and upland water service upgrade. /1\ TITLE AND LOCATION ICitvand State) f?\ V~A" ~^..n' rT~~ Island Gardens Mega Yacht Harbour, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing N/A i. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [ID Check if project pertormed with current firm Marina design and environmental permitting for 40 slip megayacht harbor on Watson Island as part of $600M site redevelopment. Hydrographic and marine resource surveys conducted and underwater bulkhead assessments provided. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Hidden Harbor, Pompano Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 2009 j. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [ID Check if project pertormed with current firm Planning and design of 384-slip dry stack marina. Design of steel sheet piling bulkhead and associated land reclamation area. Design of the concrete marine forklift launching platform supported on augercast piling and layout of floating staqinq docks. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Dinner Key Managed Mooring Field, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 2009 k. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [ID Check if project pertormed with current firm Design and environmental permitting of 225-slip managed mooring field. Conducted hydrographic surveys, jet probes, and marine resource surveys. Prepared construction plans and specifications, and provided construction administration services including underwater inspection. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR r.nMPLETED Jensen Beach Managed Mooring Field, Martin County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing Ongoing I. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [ID Check if project pertormed with current firm Design and environmental permitting of 70-slip managed mooring field. Prepared feasibility study to evaluate waterfront opportunities for wet slips and managed mooring field configurations. Conducted hydrographic and marine resource surveys, and funding grant administration. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Ambergris Cay, Turks and Caicos PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing Ongoing m. /3\ BRIEF DESCRIPTION IBrief scooe, size, cost. etc,) AND SPECIFIC ROLE [ID Check if proiect pertormed with current firm Prepared Environmental Impact Assessment (EIA) for development of private island. Pertormed hydrographic and GPS control surveys. Engineering design of coastal works including entrance channel, dredging, 150-slip marina, and RO/RO platform for shipments to remote island. (1) TITLE AND LOCATION (Citv and Stale) 360 Condominiums Development, North Bay Village, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2004 2007 n. (3) BRIEF DESCRIPTION (Brief scope. size. coSI. etc,) AND SPECIFIC ROLE IKI Check if project performed with current firm Civil engineering, bulkhead, and 27-slip marina design, including coordination and support of utility design, marine resource assessment, environmental permitting for new docking facility. Designed and developed 100% construction documents for docking facility. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Biscayne Bay Yacht Club, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 2007 o. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm Design of 82-slip marina in Coconut Grove consisting of concrete fixed docks. Design of marina utilities. STANDARD FORM 330 (6/2004) PAGE 2 ~. . 12, NAME Christy Brush 13, ROLE IN THIS CONTRACT Environmental/Permitting Director a, TOTAL 12.5 14, YEARS EXPERIENCE b, WITH CURRENT FIRM 11.5 15, FIRM NAME AND LOCATION (Citv and State) ~..,~,~* Coastal Systems International :,::.... Coral Gables, Florida IV.TIM. 16, EDUCATION (DEGREE AND SPECIALlZA TION) B.S./Marine Science 17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Oraanizations. Trainina. Awards. etc.) Ms. Brush oversees implementation of specialized projects that include coastal/waterfront resorts, residential, and mixed-use structures, docks and marinas, beach-dune system enhancement, inlet stabilization and maintenance, waterway improvements including shoreline stabilization structures, stormwater drainage systems, parks and other recreational facilities, and environmental restoration projects. She assists with the assessment of potential environmental impacts for proposed development projects, and represents Clients in negotiating impact minimization and mitigation as appropriate, while optimizing project function and value. Ms. Brush has an in-depth understanding of the many regulations and procedures governing coastal/waterfront construction, and has established relationships with key regulatory agency personnel. She specializes in conceptualization of project strategy within the multi-disciplinary regulatory and design framework, developing creative solutions and mediating consensus. Ms. Brush is accustomed to the tight schedules and funding constraints of private property owners and developers, as well as public clients. PROFESSIONAL AFFILIATIONS Geological Society of America, National Association of Environmental Professionals. South Florida Association of Environmental Professionals (Past Board Member), American Shore and Beach Preservation Association. Florida Shore and Beach Preservation Association and Urban Land Institute PUBLICATIONS "Hurricanes! Impacts on Coastal Communities. Practical implications from a Policy and Regulatory Perspective," C, Brush, Presented at the Florida Chamber of Commerce's Growth Management, Energy, Climate Change and the Environment Short Course. 2009 "Coastal Construction Permitting: A Consultant's Perspective," C, Brush. Presented at the Florida Chamber of Commerce's Environmental Permitting Summer School Conferences, 1999 through 2008 "Coastal Construction: Permitting. Redevelopment and Rigid Coastal Armoring," C. Brush. Presented at the CLE International Florida Coastal Law Conference, 2008 "Development within Florida's Coastal High Hazard Areas: DEP Coastal Construction Permitting," C, Brush, Presented at the Florida Chamber of Commerce's Growth Management and Environmental Permitting Short Course, 2007 "Dune Management on an Urban Coast," TK Blankenship, C. Brush, and J, Rubin, Presented at 2005 FSBPA Conference "2004 Storm Recovery: Achieving Re-nourishment of Florida Beaches and Marine Turtle Nesting Habitat," C, Brush, Presented at CLE International Endangered Species Act Conference September, 2005 "Special Permitting for Post-Hurricane Reconstruction," C. Brush, Presented at the Florida Chamber of Commerce's Growth Management and Environmental Permitting Short Course. 2005 r'" -- . ,,-.., , ... .'~' ~mi:t~li~'i,~.~:i.~I~~ <'-' C'~' -- I (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED City of Miami Beach Baywalk, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing Ongoing (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm a. Master planning and environmental permitting feasibility studies for proposed overwater segments of the City of Miami Beach's public Baywalk project along the shoreline of Biscayne Bay between 5th Street and Lincoln Road. Marine biological assessments and stakeholder coordination, as well as permitting strategy consultations for a complex, multi- phase project are being provided to the City. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR cnMPLETED Beachwalk, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005 2005 b. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm Civil/coastal engineering design and environmental permitting for the 4,000 foot on grade paver walkway that connects Lummus Park north to 21 st Street in the South Beach district of Miami Beach, along with associated amenities and landscaping. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Dinner Key Boatyard Marina, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 1997 1997 c. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Design and Environmental permitting for 11 O-slip marina and 600-foot bulkhead replacement. Mitigation design provided and maintenance dredging plan designed. (1) TITLE AND LOCATION (Citv and State) '2' YEAR COMPLETED Diplomat Resort and Marina, Hollywood, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2002 2002 (3) BRIEF DESCRIPTION (Brief SCODe, size. cost, etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm d. Coastal and environmental permitting for several phases of hotel, banquet, and retail facilities, modification to oceanfront seawall, and resort amenities. Underwater assessment, design and environmental permitting for 1,100 feet of Intracoastal bulkhead replacement and a 14-slip marina. Marina utilities were designed for fire protection, potable water, and electrical systems. (1) TITLE AND LOCATION (Citv and State) '2\ YEAR COMPLETED Hollywood Beach CRA Master Plan, City of Hollywood, Florida PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) Ongoing Ongoing e. [RJ Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE Provided recommendations for enhancement of the Hollywood Beach CRA Master Plan to mesh proposed planning and zoning principles with coastal storm and other flood hazard considerations as a sub-consultant to Zyscovich Architects. (1) TITLE AND LOCATION (Citv and State) ,~, Y~AR ('("\MP ETFD Hollywood Beach Management Strategic Plan, City of Hollywood, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida Ongoing Ongoing f. [RJ Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE Strategic beach management planning services provided to the City of Hollywood and Hollywood Beach CRA for immediate erosional hot spot management and potential longer term solutions for beach stabilization. (1) TITLE AND LOCATION (C/tv and State) '2' YEAR COMPLETED Indian Creek Greenway Study, City of Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2006 2006 9. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if project performed with current firm Marine structures design and environmental permitting feasibility study relative to construction of a greenway trail and waterway overlooks along the Indian Creek shoreline relative to proprietary restrictions, mangrove community impact avoidance, and shoreline stabilization for the City of Miami Beach as sub-consultant to EDAW. (1 )TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Rickenbacker Causeway Recreation Area, Miami-Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida Ongoing 2010 (Est.) (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm h. Design of shoreline stabilization and associated public recreation area improvements along 2.5 miles of shoreline of the Rickenbacker Causeway across Biscayne Bay. Marine resource and hydrographic surveys completed, and coastal engineering analysis conducted to assess design wave conditions, sediment transport and optimum shoreline stabilization methods. Design elements included landscaping, invasive species removal with native species restoration, parking improvements, stormwater management and vendor kiosks for waterlront activities. (1 )TITLE AND LOCATION (Citv and State) '2\ YEAR COMPLETED Rybovich Spencer Boatyard, West Palm Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 2008 i. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if proiect performed with current firm Design of dredging and bulkhead for 150-slip marina redevelopment to accommodate vessels up to 250' feet long. Design of 100,000 cy of dredging and 3,000 feet of bulkhead along with travel lift piers to accommodate 300-ton lift. Coastal enaineerina analvsis for f10atina structure desinn. (1) TITLE AND LOCATION (Citv and State) '2\ YEAR COMPLETED South Pointe Park, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 2009 j. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if project performed with current firm Civil engineering and coastal/environmental permitting for structural, hardscape, and landscape improvements at the 16- acre oceanfront park. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Street End and Park Shoreline Stabilization, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing Ongoing k. [RJ Check if proiec! performed with current firm (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE Design and environmental permitting for bulkhead replacement and landscape/hardscape enhancements for four (4) street ends at Biscayne Bay and Island View Park for the City of Miami Beach. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Island Gardens Mega Yacht Harbour, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing 2011 (Est.) I. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm Marina design and environmental permitting for 50-slip megayacht harbor on Watson Island as part of $600M site redevelopment. Hydrographic and marine resource surveys and underwater bulkhead assessments provided. Design of dredging, mitigation, fixed piers, and utilities for vessels up to 450 feet long. (1) TITLE AND LOCATION (Citv and State) '2' YEAR COMPLETED Trump Redevelopment Project, Sunny Isles Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing Ongoing m. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if proiect performed with current firm Coastal Construction Control Line (CCCL) permitting through the Florida DEP for Trump Palace, Royale and Sonesta buildings on oceanfront site. Processed lighting plans through the FWC to meet marine turtle requirements. Perlormed ~oastal engineering analysis to evaluate beach erosion during 100-year storm event and to provide wave loads on (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED La Perla, Sunny Isles Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2006 2006 n. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if proiect performed with current firm Coastal Construction Control Line (CCCL) permitting through the Florida DEP for a 42 story condominium project. Processed liahtina Dlans throuah the FWC to meet marine turtle reauirements. 12, NAME Adriana Cabrera 13, ROLE IN THIS CONTRACT Environmental/Permitting Project Manager 15, FIRM NAME AND LOCATION ICityand State) ~,;*". Coastal Systems I~ternational , : .,',..' Coral Gables, Flonda ',"'TlN' 16, EDUCATION (DEGREE AND SPECIALlZA nON) M.A./Marine Affairs and Policy 17, CURRENT PROFESSIONAL REGISTRATION ISTA TE AND DISCIPLINE) DEP Qualified Stormwater Management Inspector 18, OTHER PROFESSIONAL OUAlIFICATIONS IPublications. Oroanizations. Trainino. Awards. etc.! Ms. Cabrera's project management responsibilities include coordination and review of project design plans, marine resource assessments, and other technical/legal data required to efficiently obtain environmental and construction permits. She also assists project teams in facilitating project design relative to code compliance and permit issuance. PROFESSIONAL AFFILIATIONS National Urban League of Young Professionals [ m.rm~'J;Jj.~;I'~ ] ..,... (1) TITLE AND LOCATION ICitvand State) '2\ YEAR COMPLETED The Crown Hotel, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION IIf applicable) 2009 N/A a. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if project performed with current firm Redevelopment of historic structure with condominium/hotel units. Provided coastal permitting and civil engineering permitting services for site redevelopment. Also provided Florida Building Code (FBC) and City Code compliance reviews. (1) TITLE AND LOCATION ICity and State) '2\ YEAR COMPLETED Capri, Fort Lauderdale, Florida PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) 2010 N/A (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if project performed with current firm b. Development a 26-story hotel with five (5) levels of parking/retail structure. Obtained environmental resource permits from the Florida Department of Environmental Protection (DEP) that included lighting review from the Florida Fish and Wildlife Conservation Commission (FWC). Also provided Florida Building Code (FBC), City Code, and Federal Emergency Management Agency (FEMA) flood compliance reviews. (1) TITLE AND LOCATION ICitvand State) '2\ YEAR COMPLETED South of Fifth, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing 2009 (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm C. Development of four condominium buildings on top of a garage pedestal with an on-grade pool deck area and dune restoration project. Provided coastal permitting and engineering services that included permits from the Florida Department of Environmental Protection (DEP) and marine turtle lighting review through the Florida Fish and Wildlife Conservation Commission (FWC). Also provided Florida Building Code, City Code (FBC), and Federal Emergency Management Agency (FEMA) flood compliance reviews. (1) TITLE AND LOCATION ICitv and State) 12\ YEAR COMPLETED Quantum on the Bay, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) 2008 N/A d. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if proiect performed with current firm Provided post-construction guidance relative to reducing the National Flood Insurance Program Rating and flood insurance cost for the two tower interconnected residential buildings with 44 and 51 stories. Assisted team in securing a FEMA Letter of Map Revision for the project site. (1) TITLE AND LOCATION ICity and State) '2 YEAR COMPLETED Hollywood Beach Mobi Mats, City of Hollywood, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing N/A e. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if project performed with current firm Provided consulting services relative to the permanent placement of mobi mats on Hollywood Beach to provide ADA access to the general public. Secured an environmental permit from the Department of Environmental Protection (DEP). (1) TITLE AND LOCATION ICity and State) 12\ YEAR COMPLETED Lincoln Park, Miami, Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing Ongoing (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if project performed with current firm Provide consulting and permitting services for the proposed stormwater management system of the 2.5 acre park f. through the Department of Environmental Resource Management as well as the Department of Environmental Protection National Pollutant Discharge Elimination System Stormwater Notices Center. Activities include the construction of a park with shade structures, water features, seating areas/benches, footpaths, restrooms, kiosks, lighting, streetscapes along 1ih Street, Washington, Drexel and Lincoln Avenue, and other amenities. (1) TITLE AND LOCATION ICity and State) Museum Park, Miami, Florida 12\ YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing I Ongoing (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE [E] Check if project performed with current firm Planning of marine amenities and environmental permitting feasibility study completion relative to a proposed baywalk, waterfront enhancement, and other public park amenities along the shoreline and within a basin on Biscayne Bay as part of the proposed $50M Museum Park improvements project. Permitting of stormwater management for the 22-acre master planned park. g. (1) TiTLE AND LOCATiON ICity and State) Canyon Ranch, City of Miami Beach, Florida 12\ YEAR COMPLETED PROFESSIONAL SERVICES jCONSTRUCTION (If applicable) Ongoing N/A (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc,) AND SPECIFIC ROLE [E] Check if project performed with current firm Redevelopment of a 34 story and 28 story towers with understructure parking garage, swimming pools, spas, restaurant, and spa complex. Provided environmental permitting services in securing permits through the Department of Environmental Protection and lighting approval through the Florida Fish and Wildlife Conservation Commission (FWC). Also provided Florida Building Code (FBC), City Code and FEMA compliance reviews. h. '2' YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2006 I 2006 i. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc,) AND SPECIFIC ROLE [E] Check if project performed with current firm Coastal Construction Control Line (CCCL) permitting through the Florida DEP for a 42 story condominium project. Processed lighting plans through the FWC to meet marine turtle requirements. (1) TITLE AND LOCATION ICity and State) La Perla, Sunny Isles Beach, Florida STANDARD FORM 330 (612004) PAGE 2 12, NAME Sandra Rahman 15, FIRM NAME AND LOCATION ICitv and Statel ~,~':,'~,~' Coastal Systems International ...: ,c Coral Gables, Florida SYITllI1 16, EDUCATION (DEGREE AND SPECIALlZA nON) Data Processing and Management Geographic Information Systems 17, CURRENT PROFESSIONAL REGISTRATION ISTATE AND DISCIPLINE) 18, OTHER PROFESSIONAL QUALIFICATIONS IPublications. Oroanizations. Trainino. Awards. etc.! Ms. Rahman is responsible for processing all field data collected by Coastal Systems for use in analysis, monitoring, and design, She regularly utilizes Digital Terrain Modeling (DTM) software to generate contour maps and calculate cut/fill volumes for a variety of coastal and dredging projects. She is also responsible for providing deliverables in GIS formats, as well as providing full GIS capabilities for the firm with ESRI software. r ml- '-I:lelll::lMII.."'1I ] (1) TITLE AND LOCATION ICitv and State) /2\ YEAR COMPLETED Boca Inlet, Palm Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) 2004 N/A a. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.) AND SPECIFIC ROLE !Rl Check if project performed with current firm Analyzed 20 years of data to evaluate performance of the inlet and adjacent beaches with respect to sediment transport within the region. Utilized spatial analysis and GIS to recreate historical sediment budget to account for ebb shoal and maintenance dredging. (1) TITLE AND LOCATION ICitv and State) /2\ YEAR COMPLETED Rickenbacker Causeway Recreation Area, Miami - Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida Ongoing 2010 (Est.) (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE !Rl Check if project performed with current firm b. Design of shoreline stabilization and associated public recreation area improvements along 2.5-miles of shoreline of the Rickenbacker Causeway across Biscayne Bay. Marine resource and hydrographic surveys completed, and coastal engineering analysis conducted to assess design wave conditions, sediment transport and optimum shoreline stabilization methods. Design elements included landscaping, invasive species removal with native species restoration, parking improvements, stormwater management and vendor kiosks for waterfront activities. (1) TITLE AND LOCATION ICitv and Statel /2\ YEAR COMPLETED Hillsboro Inlet Channel Improvements, Broward County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing 2002 c. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc,) AND SPECIFIC ROLE !Rl Check if project performed with current firm Coastal engineering and environmental permitting for 165,000 cubic yard inlet-dredging project to improve coastal sediment sand bypassing and navigation. Hydrographic and marine resource surveys conducted. (1) TITLE AND LOCATION ICitv and State) /2\ YEAR COMPLETED Rybovich Spencer Boatyard, West Palm Beach, Florida PROFESSIONAL SERVICES 1CONSTRUCTION (If applicable) 2008 2008 d. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE !Rl Check if proiect performed with current firm Design of dredging and bulkhead for 150-slip marina redevelopment to accommodate vessels up to 250 feet long. Design of 100,000 cubic yards of dredging and 3,000 feet of bulkhead along with travel lift piers to accommodate 660-ton lift. Coastal engineering analysis for floating structure design. (1) TITLE AND LOCATION ICitv and State) 12\ YEAR COMPLETED Miami-Dade County Morphological Change Study, Miami-Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida 2006 N/A (3) BRIEF DESCRIPTION IBrief scope. size. cost, etc.! AND SPECIFIC ROLE !Rl Check if project performed with current firm e. Study of volumetric and morphological changes between Bakers Haulover Inlet and Government Cut with detailed analysis on the performance of the 32nd Street Breakwater Project. Establishment of regional GIS database for beach management and update of regional sediment budget with survey data between 1980 and 2004. Prepared recommendations for further hot-spot stabilization and backpassing beach management County-wide. (1) TITLE AND LOCATION ICitv and State) /2\ YEAR COMPLETED Peanut Island Environmental Restoration, Palm Beach County, Florida PROFESSIONAL SERVICES-j CONSTRUCTION (If applicable) 2003 2005 (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.) AND SPECIFIC ROLE !Rl Check if proiect performed with current firm Coastal/civil and marine structures design for 1.5-acre artificial reef habitat and 1.3-acre shallow seagrass lagoon. f. Additional features include a tidal pond and flushing channel, shallow-draft marina with floating docks, pedestrian boardwalks and site utility upgrades. (1) TITLE AND LOCATION ICitv and State) (2\ YEAR COMPLETED Jensen Beach Marina, Martin County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005 N/A g. 00 Check If proiect performed with current firm (3) BRIEF DESCRIPTION IBrief scooe, size, cost. etc.! AND SPECIFIC ROLE Hydrographic and marine resource mapping for marina feasibility study. In TITLE AND LOCATION ICitv and State) Broward County Artificial Reef, Broward County, Florida PROFESSIONAL SERVICES I CONSTRUCTION IIf applicable) 2003 2003 h. (3\ BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE 00 Check if project performed with current firm Design/build construction of 10-acres of artificial reef offshore of Dania and Hollywood Beaches utilizing 66,000 tons of lime rock boulder. Marine positioning, resource surveys and hydrographic surveys provided. Mooring design and coastal engineering analysis performed. (1) TITLE AND LOCATION ICitv and State) 12\ YEAR COMPLETED Island Gardens Mega Yacht Harbour, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing 2011 (Est.) i. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE 00 Check if project performed with current firm Marina design and environmental permitting for 40-slip megayacht harbor on Watson Island as part of $600M site redevelopment. Hydrographic and marine resource surveys conducted and underwater bulkhead assessments provided. (1) TITLE AND LOCATION ICitv and State) (2\ YEAR COMPLETED Hillsboro Inlet Channel Improvements, Broward County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing 2002 j. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE 00 Check if project performed with current firm Coastal engineering and environmental permitting for 165,000 cubic yard inlet-dredging project to improve coastal sediment sand bypassing and navigation. Hydrographic and marine resource surveys conducted. (1) TITLE AND LOCATION ICitv and State) (2) YEAR COMPLETED Hillsboro/Deerfield Beach Restoration, Broward County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing 2010 (Est.) k. 13\ BRIEF DESCRIPTION IBrief scooe, size, cost, etc.! AND SPECIFIC ROLE 00 Check if proiect performed with current firm Coastal engineering and environmental permitting for 550,000 cubic yard beach fill project. Performed all beach profiles, hydrographic surveys, aerial photography, magnetometer surveys and monitoring. (1 \ TITLE AND LOCATION ICitv and State) 10\ Village of Key Biscayne Beach Nourishment, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing 2002 I. (3\ BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE 00 Check if project performed with current firm Coastal engineering and environmental permitting for 120,000 cubic yard beach fill project. Marine resource and hydrographic surveys conducted, along with sand source search, jet probes, vibracores, and marine archeological surveys. (1) TITLE AND LOCATION ICitvand State) (2\ YEAR COMPLETED Fort Zachary Taylor State Park, Key West, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 2007 m. 00 Check if project performed with current firm (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc,) AND SPECIFIC ROLE Coastal engineering design and environmental permitting for breakwaters, jetties, and beach fill project for shoreline protection at park. (1) TITLE AND LOCATION ICitv and State) 12\ YEAR COMPLETED DEP State Parks Shoreline Stabilization Studies, Monroe County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida 2003 N/A n. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE 00 Check if proiect performed with current firm Shoreline condition studies at Curry Hammock, Long Key, Bahia Honda, and Fort Zachary Taylor State Parks. Feasibility for shoreline improvements and GIS work completed along with hydrographic surveys and aerial photogrammetric mapping. (1) TITLE AND LOCATION ICitv and State) 12\YEAR~nMPLETED Sunny Isles Shoreline Stabilization, Sunny Isles Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 N/A (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc,) AND SPECIFIC ROLE 00 Check if project performed with current firm o. Coastal Systems conducted an assessment of local sediment transport characteristics and the potential for shoreline stabilization within the City of Sunny Isles Beach. An evaluation of nearshore coastal processes and sediment transport characteristics in the Project vicinity was completed. Based on the assessment, a long-term beach management plan was prepared for long-term beach planning. STANDARD FORM 330 (6/2004) PAGE 2 . 12, NAME Aaron Boehning 13, ROLE IN THIS CONTRACT Project Surveyor a, TOTAL 8 15, FIRM NAME AND LOCATION (Citvand State) k~,':.. Coastal Systems International I . ,~,: Coral Gables, Florida 16, EDUCATION (DEGREE AND SPECtALlZA T/ON) Civil Engineering Technology Degree Construction Managernent Technology Degree 17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Coast Guard Captain 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Oraanizations. Trainina. Awards. etc,) Mr. Boehning has extensive experience collecting field data in the coastal/marine environment. He has planned and conducted beach profile surveys throughout the State of Florida for a variety of purposes including contract payment, monitoring, and post-hurricane assessments. These surveys have also required topographic and geodetic control surveys for the land-based work. CERTIFICATIONS Haz Mat Certification and Nuclear Gauge Safety Training r ~ ~'I"~.I'(;I:[.J111 :(etIi-"1 , (1) TITLE AND LOCATION (Citv and State) /2\ YEAR COMPLETED Rickenbacker Causeway Recreation Area, Miami - Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida Ongoing 2010 (Est.) (3) BRIEF DESCRIPTION (Brief SCODe, size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm a. Design of shoreline stabilization and associated public recreation area improvements along 2.5-miles of shoreline of the Rickenbacker Causeway across Biscayne Bay. Marine resource and hydrographic surveys cornpleted, and coastal engineering analysis conducted to assess design wave conditions, sedirnent transport and optimum shoreline stabilization methods. Design elements included landscaping, invasive species removal with native species restoration, parking improvements, stormwater management and vendor kiosks for waterfront activities. (1) TITLE AND LOCATION (Citvand State) 12\ YEAR COMPLETED Village of Key Biscayne Beach Nourishment, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing 2002 b. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if proiect performed with currenl firm Coastal engineering and environmental permitting for 120,000 cubic yard beach fill project. Marine resource and hydrographic surveys conducted, along with sand source search, jet probes, vibracores and marine archeological surveys. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Hillsboro Inlet Channel Improvements, Broward County, Florida PROFESSIONAL SERVICES -r CONSTRUCTION (If applicable) Ongoing 2002 c. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm Coastal engineering and environmental permitting for 165,000 cubic yard inlet-dredging project to improve coastal sediment sand bypassing and navigation. Hydrographic and marine resource surveys conducted. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Hillsboro/Deerfield Beach Restoration, Broward County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing 2010 (Est.) d. (3) BRIEF DESCRIPTION IBrief SCODe, size, cost. etc,) AND SPECIFIC ROLE [8] Check if proiect performed with current firm Coastal engineering and environmental permitting for 550,000 cubic yard beach fill project. Performed all beach profiles, hydrographic surveys, aerial photography, magnetometer surveys and monitoring. (1) TITLE AND LOCATION ICitvand State I 10\ v<::", rm'D' <::T<::n Cap Cana Marine Works, Punta Cana, Dominican Republic PROFESSIONAL sERVICEsl CONSTRUCTION (If applicable) 2006 2008 e. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm Coastal engineering design for the dredging of 1.25-mile canal to create basin for 1,000+ slip marina. Design of shoreline stabilization, beaches, entrance channel jetties, numerical modeling of coastal processes and hydrographic surveying. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Dinner Key Marina, Coconut Grove, Florida PROFESSIONAL SERVICES I CONSTRUCTION (ff applicable) Ongoing 2009 f. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm Design and environmental permitting of deck replacement, access gate improvements and maintenance dredging for 582-slip marina. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR cnMPLETED Fort Zachary Taylor State Park, Key West, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 2007 g. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm Coastal engineering design and environmental permitting for breakwaters, jetties and beach fill project for shoreline protection at park. (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED Cap Juluca Beach Restoration, Anguilla, B.W.I. PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 2009 h. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [RI Check if project performed with current firm Assessment of 2,000 feet in Maunday's Bay of beach after Hurricane Ike in 2008, and design of emergency beach restoration project with approximately 20,000 cubic yards of sand. Provided contract payment hydrographic surveys and construction management. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Dinner Key Managed Mooring Field, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 2009 i. (3) BRIEF DESCRIPTION IBrief scooe, size, cost. etc.} AND SPECIFIC ROLE [RI Check if proiect performed with current firm Design and environmental permitting of 225-slip managed mooring field. Conducted hydrographic surveys, jet probes, and marine resource surveys. Prepared construction plans and specifications and provided construction administration services including underwater inspection. (1) TITLE AND LOCATION (Citv and State) 19\ Ambergris Cay, Turks and Caicos PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing Ongoing j. (3) BRIEF DESCRIPTION (Brief SCODe, size, cost. etc,) AND SPECIFIC ROLE [RI Check if proiect performed with current firm Prepared Environmental Impact Assessment (EIA) for development of private island. Performed hydrographic and GPS control surveys. Engineering design of coastal works including entrance channel, dredging, 150-slip marina and RO/RO platform for shipments to remote island. (11 TITLE AND LOCATION (Citv and State) 19\ v~^" ~mm' ~T~n Rybovich Spencer Boatyard, West Palm Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 2008 k. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RI Check if project performed with current firm Design of dredging and bulkhead for 150-slip marina redevelopment to accommodate vessels up to 250 feet long. Design of 100,000 cubic yards of dredging and 3,000 feet of bulkhead along with travel lift piers to accommodate 660-ton lift. Coastal engineering analysis for floating structure design. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Jensen Beach Managed Mooring Field, Martin County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (/f applicable) Ongoing Ongoing m. (3) BRIEF DESCRIPTION (Brief SCODe. size. CDSt. etc.) AND SPECIFIC ROLE [RI Check if proiect performed with current firm Design and environmental permitting of 70-slip managed mooring field. Prepared feasibility study to evaluate waterfront opportunities for wet slips and managed mooring field configurations. Conducted hydrographic and marine resource surveys and funding grant administration. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Sunny Isles Shoreline Stabilization, Sunny Isles Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If app/icable) 2008 N/A (3) BRIEF DESCRIPTION (Brief SCDDe. size. CDSt. etc.) AND SPECIFIC ROLE [RI Check if project performed with current firm n. Coastal Systems conducted an assessment of local sediment transport characteristics and the potential for shoreline stabilization within the City of Sunny Isles Beach. An evaluation of nearshore coastal processes and sediment transport characteristics in the Project vicinity was completed. Based on the assessment, a long-term beach management plan was prepared for long-term beach planning. STANDARD FORM 330 (6/2004) PAGE 2 rJ..'I'l"1:I=I~Imr.A 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) Sunny Isles Shoreline Stabilization Study Sunny Isles, FL 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 fit~'.'j~I:I:I:iIW;t;.~r;.'~~1 a, PROJECT OWNER b, POINT OF CONTACT NAME N/A c. POINT OF CONTACT TELEPHONE NUMBER City of Sunny Isles Ms. Susan Simpson (305) 957-1306 18070 Collins Avenue Sunn Isles Beach, Florida 33160 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Coastal Systems conducted an analysis of coastal processes at Sunny Isles Beach to provide recommendations for future beach management. Long term and storm- induced beach erosion along the 2.5 miles of City of Sunny Isles Beach requires frequent and costly maintenance with beach nourishment. Beach compatible sand sources in Florida are diminishing, and long term stabilization of hot spot areas and reduction in beach nourishment event frequency overall may be beneficial in maintaining adequate beach width for shore protection and for recreational use. i,~ Coastal Systems conducted a comprehensive coastal engineering study for Sunny Isles to evaluate coastal processes along the shoreline of Sunny Isles. Detailed hydrographic surveys of two existing submerged breakwaters were conducted along with beach profiling to provide data for input into the numerical modeling software. Offshore wave statistics were prepared utilizing wave data from 1980- 1999 to obtain annual conditions that influence sediment transport. _,.._>h~ -- . '"'-'lI ........ i~~ _......... !':! ;E.~ Ei ,"0.._ Wave modeling was conducted by utilizing the Danish Hydraulics Institute (DHI) MIKE 21 Spectral Wave (SW) model to simulate offshore waves propagating onshore. This model was coupled with the MIKE-21 Hydrodynamic (HD) model to determine the littoral current generated by breaking waves. The resulting sediment transport was evaluated to identify erosion trends along the shoreline. The numerical modeling results indicated that the north segment is characterized with the highest degree of erosion, while the south section was mildly erosional, and the middle section was relatively stable. Two hot spots were identified in the northern section, and wave focusing results were evaluated. Beach management recommendations were prepared based on the coastal engineering results, and coastal structure concepts were prepared for shore stabilization. Additional beach management recommendations were provided as longer term solutions to reduce erosion rates, mitigate local hot spots, and to extend the life of beach nourishment projects. [ ~~.]~EMil.]~~~ I (1) FIRM NAME (2) FIRM LOCATION (3) ROLE a. ~ Coastal Systems International, Inc. leoral GableslW est Palm Prime : " '" - -~ . Beach, Florida -", ....- ,- I"ITIMI (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. STANDARD FORM 330 (1/2004) PAGE 3 . 20. EXAMPLE PROJECT KEY NUMBER . ,... ..., 2 21. TITLE AND LOCATION (City and State) Miami-Dade Truck Haul Miami-Dade County, FL 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 Ongoing ml;.l:{..lIl:(lJn.l'.'j~a:r:tB.]:W'~lI[.]~1 a. PROJECT OWNER b, POINT OF CONTACT NAME c, POINT OF CONTACT TELEPHONE NUMBER (305) 372-6850 Miami-Dade County DERM Mr. Brian Flynn 701 NW 1 Court Miami, Florida 33136 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) ___I -1 Coastal Systems provided engineering services for the Miami-Dade County Department of Environmental Resource Management (DERM) to design truck haul beach nourishment projects within the County. Beach profile survey data was obtained, and fill templates designed for the following areas in Miami Beach: r_... 1- . 27th Street - 800 linear feet (If) with 30,000 cubic yards (cy) . 44th Street -1,700 If with 50,000 cy . 55th Street - 2,000 If with 30,000 cy The projects were constructed in 2007. The Truck Haul projects provide the flexibility for the County to manage six "hot-spot" erosion areas in between the larger federal shore protection beach nourishment projects. Coastal Systems also assisted DERM in the redesign of the 27th Street area to be modified from a truck haul project to a larger sand backpassing project. The backpassing project consisted of pumping sand approximately 8,000 feet updrift with a small hydraulic dredge from the accretional south beach area of Miami Beach north to the 27th Street erosional area. In 2007, approximately 70,000 cy of sand were backpassed to maintain sand within Miami Beach. Additional beach management projects were requested by DERM, and Coastal Systems was retained in 2008 to design the following truck haul beach nourishment projects in Miami-Dade County: . 67th Street - 1,400 If of beach with 121,000 cy . Village of Bal Harbour - 2,200 If with 69,100 cy . Sunny Isles - 4,900 If with 114,500 cy Coastal Systems also assisted with the environmental permitting through the U.S. Army Corps of Engineers and the Florida Department of Environmental Protection. The 67th Street and Bal Harbour projects were constructed in 2009 as part of the federal stimulus funding package. I m~I@JM~ I (1) FIRM NAME (2) FIRM LOCATION (3) ROLE a. ~ Coastal Systems International, Inc. Iwest Palm Beach/Coral Prime :\"~'.'; :. " .-....'- Gables, Florida :", ~. -' , IVllIN. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. STANDARD FORM 330 (1/2004) PAGE 3 21. TITLE AND LOCATION (City and State) Bayfront Streetends Miami Beach, FL fi.t.~!JIn.l'.Tj~l:;l=iStlWil.]:I~'~'I[.]~1 a, PROJECT OWNER b, POINT OF CONTACT NAME City of Miami Beach Ms. Lisa Botero 1700 Convention Center Drive Miami Beach, Florida 33139 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Miami Beach secured funding from the Florida Inland Navigation District (FIND) to improve waterfront areas at South Shore Drive (Normandy Shores), 10th Street, 14th Street, Lincoln Road, and Island View Park. . 20, EXAMPLE PROJECT KEY NUMBER . ... .... 3 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing 2011 (Est.) c, POINT OF CONTACT TELEPHONE NUMBER (305) 673-7080 r.d#.~' I : ): :: .., ~,,=.-.. 1'1 '='" ~ ~~. '-1 ~:~= : .. ~ .-... .... ..._~. -- _... I . -- liiiiiifiii~ _.. -..- .@:...'Cr' ~ - Coastal Systems International, Inc. designed and permitted the bulkheads at all five locations. Hydrographic and marine resource surveys were conducted at all locations to address potential seagrass impacts from the waterfront construction in the sensitive marine environment of Biscayne Bay. Steel sheet piling was specified to be installed directly in front of the existing bulkheads to meet federal and state exemption criteria. The cantilever design also avoided excavation behind the bulkhead alignment. Environmental permits were processed from the U.S. Army Corps of Engineers, Florida Department of Environmental Protection (DEP), and Miami-Dade County Department of Environmental Resource Management (DERM). Coastal System provided streetscape design services for several streets in Miami Beach. These streets include 10th St., Lincoln Rd and South Shore Drive on the bay side, along with 1 ih Street 18th Street, 20th Street, 32nd Street, 34th Street, 3ih Street and 38th Street on the beach side. Design includes paving, grading, drainage, utility design and parking & striping layout. A landscaped street end park/walkway design was also included for each street. In addition, street end improvements were designed for South Shore Drive, 10th Street and Lincoln Road to improve upland access to the waterfront. Paving, grading, drainage lighting and landscape/hardscape improvements were also incorporated into the bulkhead improvements. Construction was completed for the Island View Bulkhead in 2008, and construction of the Lincoln Road and South Shore Drive in scheduled for 2010. [ ~~~~:f!J.[.j~l~ J (1) FIRM NAME (2) FIRM LOCATION (3) ROLE a. 6 Coastal Systems International, Inc. Coral Gables, Florida Prime t ~'''''._,- '. -.-:..- '. . ~-- ;. 11\ Ilfl (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. STANDARD FORM 330 (1/2004) PAGE 3 21. TITLE AND LOCATION (City and State) City of Miami Beach Baywalk Miami Beach, FL a. PROJECT OWNER f:iLriEI.JlI::(IIn::.l"'j~I:I:L~.]:I~'~'I[.]~1 b. POINT OF CONTACT NAME City of Miami Beach Ms. Lisa Botero 1700 Convention Center Drive Miami Beach, Florida 33139 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost) The City of Miami Beach has been working to progressively enhance public access to and along their beautiful oceanfront and bayfront shorelines as part of the overall local portion of the extensive Atlantic Greenway Network (AGN), a recreational and alternative transportation corridor. A significant piece of the AGN is the Baywalk path along the Biscayne Bay shoreline between 5th Street and Lincoln Road. More than 3,000 linear feet of the Baywalk has been constructed already, linking public street ends and traversing other waterfront properties. An additional 2,700 feet of the Baywalk waterfront pathway conceptualized in the Master Plan remains to be constructed, and much of this must be sited overwater to avoid conflicts with existing structures and private uses. . 20, EXAMPLE PROJECT KEY NUMBER . .. .. . 4 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing Ongoing c, POINT OF CONTACT TELEPHONE NUMBER (305) 673-7080 Coastal Systems has been working closely with the City of Miami Beach to consult with the State of Florida, as owner of the submerged lands, and other environmental agencies to discuss proprietary and regulatory permitting feasibility. Marine biological assessments have been completed as part of coordinating a design approach that will provide the desired public shoreline access while simultaneously minimizing potential impacts to the environment and riparian property owners. I ~1iiIiIma:{.]~~::(III[.]~~'~~ I (1) FIRM NAME (2) FIRM LOCATION (3) ROLE a. er Coastal Systems International, Inc. Coral GableslWest Palm Prime " "-.~ Beach, Florida , '".'., I I '" (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. STANDARD FORM 330 (1/2004) PAGE 3 . 20. EXAMPLE PROJECT KEY NUMBER . ... ., 5 21, TITLE AND LOCATION (City and State) Capri South Beach Streetscape Miami Beach, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2008 mlrl:[.JIIJ:(II~"'j~I:I:If:t~~ll[.]~1 a, PROJECT OWNER b, POINT OF CONTACT NAME c, POINT OF CONTACT TELEPHONE NUMBER (317) 805-0707 Maefield Development Ms. Mae Siffin 250 East 96th Street, Suite 580 Indiana olis, Indiana 46240 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) ~ Coastal Systems provided streetscape design services to improve the right- of-way for 16th Street and Lincoln Terrace street ends as part of the Capri South Beach Project. Capri South Beach encompasses three (3) distinctive buildings on nearly 500 feet of waterfront on Biscayne Bay. The streetscape improvements included decorative pavers along with parking, sidewalks and landscaping to accommodate adjacent residences as part of the overall neighborhood improvements. The Lincoln Terrace street end is approximately 325 feet long and required a 12-inch water main extension. Similarly, the 16th Street extension required an 8-inch water main extension and slip lining of an existing 8-inch sanitary sewer line. , Both street ends were low in elevation and adjacent to the bay and presented challenges for the drainage design. Detailed topographic surveys were obtained to determine the drainage areas and an inverted-crown configuration was selected. The drainage improvements included stormwater pumping stations connected to outfalls with associated controls. ~~I;:I:l.]~~:(eJ.[.]~lIeJ INVOLVED WITH if HIS ~:[.JJ:(!lIr (3) ROLE Prime a. (1) FIRM NAME Coastal Systems International, Inc. Cf.'.,:,..,.,'~,."'. .....--_. . ..-, S I M' (2) FIRM LOCATION oral Gables, Florida (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE f. STANDARD FORM 330 (1/2004) PAGE 3 21. TITLE AND LOCATION (City and State) Little Haiti Cultural Center Miami, FL a. PROJECT OWNER City of Miami 444 SW 2nd Avenue, Suite 1038 Miami, Florida 33130 . 20. EXAMPLE PROJECT KEY NUMBER . ... -. 6 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2008 m(;f:ti)l~elrr!l'.'j~I::I~IWil.]:I~'~'I[.]~1 b, POINT OF CONTACT NAME Mr. Robert Hatton c, POINT OF CONTACT TELEPHONE NUMBER (305) 416-1261 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) .1 J ~" l .~:;. -, ',) ~. .. -. ~-<r:. -~- '" ~~. ' I?, -',~.~~,--;:-~~ -.., ; ~ '1, I ~ ~ -- ~~. -~. . ........ ,...-.....:lI:l ... -~-=.a!"'d~-~ _Hw .... _ ~ " Coastal Systems provided streetscape design to convert NE 59lhTerrace from a two-way road to a one-way road with street parking on both sides. Improvements included access to businesses and parking lots, grading of the street to provide proper drainage and new striping and signage for the design. The improvements were from NE 2nd Avenue to 115 feet beyond NE 3rd Avenue (approximately 800 If). The design of NE 59lh Terrace is part of the Little Haiti Cultural Center project funded by the City of Miami and designed by Zyscovich. Coastal Systems also provided water and sewer design for the Little Haiti Cultural Club, Theatre and Parking Lots. The design consist of 800 If of 12" D.I.P. water mains which includes two fire line services, two domestic water service connections, and three irrigation water services for the parking lots. All services were designed with backflow preventers. Additionally, new sanitary sewer connections were designed to replace older lines. Coastal Systems designed drainage systems to manage on-site stormwater runoff. The site drainage design consists of over 700 If which includes an exfiltration trench system connected by 27 drainage structures. The street drainage design consists of 525 If of exfiltration trench connecting 10 drainage structures. Additionally, the stormwater runoff was managed by the design of a complex retention/detention system using (6) 48" diameter HDPE (High Density Polyethylene) pipes, 70 feet in length each discharging into the ground. This drain field is being used as an individual component to drain the site/roof area of over 1 acre, on land with poor soil percolation. Coastal Systems processed the water/sewer system permits through Miami-Dade WASD, and the stormwater plans through Miami-Dade DERM. I fi2.~~~ell[.]~IC!JID!J.]I1'j::l.~:[.JlI~elr I (1) FIRM NAME (2) FIRM LOCATION (3) ROLE ~ Coastal Systems International, Inc. Coral Gables, Florida Prime a. .' ,...~;.~ : ",Y-.~>', ' -..~. . (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE f. STANDARD FORM 330 (1/2004) PAGE 3 . . ..... . 20. EXAMPLE PROJECT KEY NUMBER ~I$lflmIil. 7 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 21, TITLE AND LOCATION (City and State) Rickenbacker Causeway Shoreline and Roadway Miami-Dade County, FL a. PROJECT OWNER Ongoing 2010 fm.~:{.JlI:(tJn.l'l'j~I::::l:lh'"lWil.:r:ro~ll[.]~1 b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER (305) 375-2863 Miami-Dade County Public Works Ms. Svetlana Moorey, P.E. Department 111 N.W. First Street, Suite 1510 Miami, Florida 33128 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Rickenbacker Causeway connects Key Biscayne to downtown Miami, crossing Virginia Key and Hobie Island in Biscayne Bay. The Causeway serves as an important transportation corridor with approximately 2.5 miles of recreational shoreline with sandy beaches used for swimming and water sports. Coastal Systems designed the causeway shoreline improvement project incorporating shoreline stabilization and upland improvements. Field investigations were conducted including beach profiling and marine resource (seagrass) surveys, as well as upland native and exotic vegetation mapping. Coastal engineering analyses were completed to determine winds, waves and sediment transport along the Project shoreline. Designs were developed for the shoreline stabilization including rock revetment, mangrove planter and beach nourishment stabilization. The beach nourishment was designed to avoid impacts to sensitive seagrass beds immediately adjacent to the Project shoreline. Sand sources were evaluated based on geotechnical analyses to determine the most economical and compatible beach fill. The beach restoration project includes upland paving and grading as well as stormwater management improvements. The project combines an extensive upland exotic vegetation removal effort with replanting of native species. In addition, mangrove planters were designed to enhance the shoreline and protect existing mangrove vegetation. Coastal Systems processed environmental regulatory permits for the Project from the South Florida Water Management District, Miami-Dade County DERM and the U.S. Army Corps of Engineers. Coastal Systems prepared construction plans and specifications, and assisted the County with construction administration. I m~~~=!,I[.]~~ I (1) FIRM NAME (2) FIRM LOCATION (3) ROLE a. e Coastal Systems International, Inc. Coral Gables, Florida Prime :"'-".~ - " ."-... ''''Sfl I (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. STANDARD FORM 330 (1/2004) PAGE 3 21, TITLE AND LOCATION (City and State) La Perla Sunny Isles Beach, FL a. PROJECT OWNER . 20. EXAMPLE PROJECT KEY NUMBER . ... .... 8 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 2006 ~:[.~vsMW;I:.]~~ll[.]~. b, POINT OF CONTACT c, POINT OF CONTACT TELEPHONE NUMBER (305) 443-8288 La Perla Sunny Isles, LLC Mr. Gregg Glasser c/o: Cornerstone Group 2121 Ponce de Leon Boulevard Coral Gables, Florida 33134 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost) I The La Perla Condominium project consisted of construction of a 42 story, 326 unit superstructure with a multi-level parking base. The beachside pool deck included a free-form swimming pool, circular spa, and multiple metal-framed cabana structures. Additionally, the developer remodeled the adjacent 163rd Street end that acts as a public access point to the beach. Coastal Systems provided environmental permitting as well as coastal engineering services for the project. Specifically, Coastal Systems obtained the Department of Environmental Protection (DEP) Coastal Construction Control Line (CCCL) Permit as required for structures and activities that cross partially or wholly across the recorded CCCL. In addition to the structures noted above, Coastal Systems obtained authorization for excavation and fill, hardscape, landscape, and lighting activities. Lighting plans were approved by the Florida Fish and Wildlife Conservation Commission. Coastal Systems' coastal engineering team prepared a site specific 100-year Storm Analysis that determined the anticipated impacts of a 100 year storm event on the project site/structure. This analysis provided the anticipated wave crest height, as well as the eroded profile associated with a 100 year storm event. J a. ~,.,.,,~'" ,." , I";"'I)U - (1) FIRM NAME Coastal Systems International, Inc. ~~~~etIl[.]~I["I~~'I.].~:[.~ (2) FIRM LOCATION (3) ROLE Coral Gables, Florida Subconsultant (Coastal Permitting) (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. STANDARD FORM 330 (1/2004) PAGE 3 20, EXAMPLE PROJECT KEY NUMBER UJI.r.l"1:I=I~Ij[:r;1. 9 21. TITLE AND LOCATION (City and State) Trump Redevelopment Project (Phase I, II, and III) Sunny Isles Beach, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing Ongoing a. PROJECT OWNER Dezer Properties, Inc. 18001 Collins Avenue Sunny Isles Beach, FL 33160 FiJ.~J::(ell1.1"'j~I:I:If:t~'I[.]~J b, POINT OF CONTACT Mr. Mark Hutchinson c. POINT OF CONTACT TELEPHONE NUMBER (305) 932-1000 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) , ,~~i .' oi~PB-~Y =; ;;C"~II; ....,1 - ... " I II~, - I" to' ~ ~ ~ + Jot. ~:- i I!"',=~I gll!'~11 ~_;n : ~\: -:~. I - t e t;: -: .... . -.. - l. .. '" "'"""""" .-ffl" The Trump Redevelopment project consisted of three phases: Trump Palace Condominium, Trump Royale Condominium, and Trump Sonesta Hotel. Trump Palace Condominium consisted of the construction of a 45 story, 278 unit tower with tri-Ievel understructure parking garage, cabanas, swimming pool, spa, water features, hardscape, and landscape/lighting activities. Trump Royale Condominium included the construction of a 45-story, 391 unit tower on a bi-Ievel garage pedestal, swimming pool and spa atop the garage, on-site and off-site dune enhancement activities, and hardscape, landscape, and lighting activities. For both the Palace and Royale Condominiums, Coastal Systems obtained the Department of Environmental Protection (DEP) Coastal Construction Control Line (CCCL) Permits as required for structures and activities that cross seaward of the CCCL. Lighting plans were approved by the Florida Fish and Wildlife Conservation Commission as part of the CCCL permit process. Coastal engineering services were provided by Coastal Systems' coastal engineers to determine the anticipated impacts of a 100 year storm event on the structure. This analysis provided the anticipated wave crest height, as well as the eroded profile associated with a 100 year storm event. A Wave Load Analysis was also conducted to provide the wave load forces on vertical walls and columns during a 100-year storm event. Additionally, Coastal Systems provided DEP CCCL permitting services for the Trump Sonesta Hotel to construct a shaded seating area seaward of the hotel and to provide dune enhancement activities, landscaping, and lighting activities on site. The lighting activities/plans were also approved by the Florida Fish and Wildlife Conservation Commission (FWC) as part of the CCCL permit process. a. fB<.:,'>',',.~,'" . . '..... , IYITIMI (1) FIRM NAME Coastal Systems International, Inc. ~1iIIiOOS1~~~I[.]~IIiIm'linl'j:l'l\!aIGfIG.ISJ~:[.lIl::(elr (2) FIRM LOCATION (3) ROLE Coral Gables, Florida Subconsultant (Coastal Permitting) (1) FIRM NAME b. (1) FIRM NAME c. (1) FIRM NAME d. (2) FIRM LOCATION (3) ROLE (2) FIRM LOCATION (3) ROLE (2) FIRM LOCATION (3) ROLE STANDARD FORM 330 (1/2004) PAGE 3 . 20, EXAMPLE PROJECT KEY NUMBER ~IW 10 21. TITLE AND LOCATION (City and State) Beachwalk Miami Beach, FL 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 2006 m~~I:I:~.]:t~'~'I[.m a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER (305) 673-7080 City of Miami Beach Ms. Lisa Botero Division of Environmental Resource Management 1700 Convention Center Drive Miami Beach, Florida 33139 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Coastal Systems in conjunction with Bradshaw Gill & Associates (the landscape architect), prepared construction documents for an on-grade greenway that connects Lummus Park to the 21 st Street wooden boardwalk. The beachwalk measures approximately 3,400 feet by 15 feet and connects to five street ends. Adequate ramp slopes and curves were provided to . . comply with ADA requirements and to accommodate emergency vehicles. .... \ Coastal Systems worked closely with the Department of Environmental Protection Bureau of Beaches and Coastal Systems, Dade County Department of Environmental Resource Management and the City of Miami Beach to obtain state and local approval. Extensive public meetings were held to acquire authorization from the riparian upland owners. Civil engineering drawings included grading, pavin~, and drainage as well as utility service connections and street end designs to extend 1 i and 18th Streets. Marine turtle lighting and construction administration services were also provided. I f:m.~:[.]~I:t::(ItI.[.]~I(!)ImYlil1l'j:lI~~:[.lIJ::(ltIr ] (1) FIRM NAME (2) FIRM LOCATION (3) ROLE a. it. Coastal Systems International, Inc. Coral Gables, Florida Prime (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE f. STANDARD FORM 330 (1/2004) PAGE 3 I ml.~ ::l~ =I :I-"':l:e] ~ I ~ I =I'" :1~':i. [ell :1~'. [e] ~ tmll ::U~, M =l.!:I3~ :rell J:tell f.'i 26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in Example Projects Key section below before completing PERSONNEL CONTRACT table, Place under project key number for (From Section E, (From Section E, articipation in same or similar role. Block 12) Block 13) 1 2 3 4 5 6 7 8 9 10 Timothy K. Blankenship Project Manager X X X X X X X X X Christy Brush Regulatory/Environmental X X X X X X X X X Permitting Director Adriana Cabrera Regulatory/Envi ronmental X X X X Permitting Project Manager Craig McGillawee Structural Engineer X X X X Andres Perez Civil Engineer X X X X X X Orestes Betancourt Site/Civil Designer X X X X X Sandra Rahman GIS Analyst X X X X X X Aaron Boehning Surveyor X X X I fl;l.I::t:f"l'lI' ~'JlJ:('" f.:~ ~ TITLE OF EXAMPLE PROJECT :"~'---. '. TITLE OF EXAMPLE PROJECT (FROM SECTION F) No. .-,- .-,.. No. ~.r.:.~~.":.~ (FROM SECTION F) 1 Sunny Isles Shoreline Stabilization Study 6 Little Haiti Cultural Center 2 Miami-Dade Truck Haul 7 Rickenbacker Causeway Shoreline and Roadway 3 Bayfront Street Ends 8 La Perla 4 City of Miami Beach Baywalk 9 Trump Redevelopment 5 Capri South Beach Streetscape 10 Beachwalk No. TITLE OF EXAMPLE PROJECT (FROM SECTION F) No. TITLE OF EXAMPLE PROJECT (FROM SECTION F) STANDARD FORM 330 (1/2004) PAGE 4 m.t~, I] I] Ii [e] ~ '~~lilliie] :11'1 ,~, i [e] ~ I 30, PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY, ATTACH ADDITIONAL SHEETS AS NEEDED, 0,~',~,'""",:'~,,, m-- I\'IT~MI Coastal Systems International, Inc (Coastal Systems) has extensive experience in the civil engineering design of public parks and open spaces. Coastal Systems works closely with land planners and architects to provide comprehensive designs for public spaces. Recent project experience includes the South Pointe Park project in Miami Beach, which incorporated over 20 acres of public space. In addition, Coastal Systems has been the lead consultant on over five oceanfront pedestrian path projects in South Florida, totaling over 3 miles of paths including associated public spaces, beach access areas, and native dune vegetation improvements. Specific park experience includes Beachwalk, North Beach Recreational Corridor, Indian Creek Greenway and Bal Harbor Jogging Path. The civil engineering team at Coastal Systems has developed specialized expertise in utilities and associated heavy civil works design for private islands and cruise ship destinations in the Caribbean. These designs have included site planning, water, sewer, fuel and electrical distribution. The utilities are incorporated with roadway plans and associated stormwater management. Utility designs have been completed with reverse osmosis water treatment, electrical generation and sewage treatment package plants for these remote areas. Visit our website for more information www.coastalsvstemsint.com. 30, I. AUTHORIZED REPRESENTATIVE The fore oin is a statement of true facts. 32. DATE May 26, 2010 STANDARD FORM 330 (1/2004) PAGE 5 ~~~~ 1. SOLICITATION NUMBER (If any) 1 0-04-01 PART II - GENERAL CONDITIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a, FIRM (OR BRANCH OFFICE) NAME @ Coastal Systems International, Inc. 2b. STREET 464 South Dixie Highway 2c. CITY Coral Gables 3. YEAR ESTABLISHED 1995 4, DUNS NUMBER 835411604 . 2d. STATE Florida 2e. ZIP CODE 33146 a, TYPE Corporation b, SMALL BUSINESS STATUS 6a, POINT OF CONTACT NAME AND TITLE Mr. Tim Blankenship, P.E. 7, NAME OF FIRM (If block 2a is a branch office) 6b, TELEPHONE NUMBER 305661-3655, ext. 130 stemsint.com .. ~::I-"If.':II!;!:I:::l'J Coastal Technology Corporation ~.~..~~ a, c, No, of Employees a. Profile c, Revenue Index Function b, Discipline Code b. Experience Number Code (1) FIRM (2) BRANCH (see below) 2 Administrative 5 A02 Aerial Photography 1 7 Biologist C07 Coastal Engineering 4 8 CADD 2 C15 Construction Management 3 12 Civil Engineer 2 D08 Dredging Studies and Design 2 16 Construction Manager E09 Environmental Impact 2 Studies/Assessments 24 Environmental Scientist E10 Environmental & Natural 2 Resources Ma in 29 GIS Technician G04 GIS 33/38 Land/Hydrographic Surveyor H01 Harbors, jetties, elc 2 48 Project Manager H13 Hydro Survey 2 57 Structural Engineer 2 P06 Planning (Site, Installation & 2 Pro'ect 58 Technical Assistant R06 Rehabilitations Buildin s/Structures Coastal Engineers R11 Rivers, Canals, Waterways Permitting Specialist 2 S04 Sewage Collection, Treatment & 2 Dis osal S09 Structural Design S13 Stormwater Handling 2 T04 Topographic Survey W03 Water Supply Treatment & & Distribution R04 Recreational Facilities (Parks, 4 Marinas Total 21 3 PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,00 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 0 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal 6 4. $500,000 to less than $1 million 9. $25 million to less than $50 million Work c. Total Work 10. $50 million or greater STANDARD FORM 330 (1/2004) PAGE 6 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to City of Sunny Isles by R. Harvey Sasso fur Coastal Systems International, Inc. whose business address is 464 South Dixie Highway, Coral Gables, Florida 33146 and (if applicable) its Federal Employer Identification Number (FEIN) is 65- 0543399 (IF the entity had no FEIN, include the Social Security Number of the individual signing this swom statement: 2. 1 understand that a "public entity crime" as defined in Paragraph 287.l33(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287 .133(1)(b), Florida Statutes means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry of a plea of guilty or nolo contenders. 4. I understand that an "affiliate" as defined in Paragraph 287.133(1)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity come. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.l33(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 6. Based on information and belief, the statement which I have marked below is true in a relation to the entity submitting this sworn statement. (Please indicate which one (1) of the following three (3) statements is applicable.) ~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(2) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(3) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or agents who are active in management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. However, there has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attached is a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH I (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD A OUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE ~ ORY TW\) ANY CHANGE IN THE INFORMATION CONTAINED IN THIS 1~ R.Harvey Sasso SIGNA TURE OF A FIANT (Printed or Typed Legal Name of Affiant) State of Florida County of Miami-Dade Swo ~o and subserib d before me ~ {~^-. "t \4.. J. day of May ,2010 by V/+J.leSs A- 7... i.J s S /- >i AC!.)..M?> () Notary's Name Printed, Stamped or Typed Personally Known: X or Produced Identification Notary Seal: f'k.A\.f'\:~~~'< VANESSA RUSSI-MACHADO ~*: :.~ MY COMMISSION # DD 563796 ;~i"....i~'; EXPIRES: October 14, 2010 "'ilflt~r-\" Bonded Thru Notary Public Underwriters Identification Produced NON-COLLUSIVE AFFIDA VIT State of Florida) County of Miami-Dade) R. Harvey Sasso and says that: being first duly sworn, deposes (1) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has submitted the attached Bid; (2) He/she is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; (3) Such Bid is genuine and is not a collusive or sham Bid; (4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a collusive or sham Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work; The price or prices quoted in the attached Bid are fair and proper and are not tainted by llusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any ts agents, repr en tives, owners, employees or parties in interest, including this R. Harvey Sasso (Printed or Typed Legal Name of Affiant) State of Florida County of Miami-Dade 7t=rih:fCf1~:~YOf VANE$S-4 ~s.<; I - J:,J A-l!.J..l-AJJD Notary's Name Printed, Stamped or Typed May ,2010 by Personally Known: X or Produced Identification Notary Seal: "I(:' p~" VANESSA RUSSI-MACHADO l'i>~i~:;:< MY COMMISSION # DD 563796 ~:~:~I EXPIRES: October 14, 2010 "V;1,iif;~~%.~~ Bonded Thru Notary Public Underwriters Identification Produced