Loading...
HomeMy WebLinkAboutNutting Engineers #3 Nutting Engineers Geotechnical & Construction Materials Engineering, Testing, & Inspection Environmental Services of Florida Inc.1 Established 1967 Your Project is Our Commitment Offices throughout the state of Florida www.nuttingengineers.cominfo@nuttingengineers.com ~ May 24, 2010 City of Sunny Isles Beach Office of the City Clerk 18070 Collins Avenue Sunny Isles, FL 33160 Attn: Mr. Rick Conner, City Manager RECEIVED RE: Request for Proposal for Professional Engineering Services RFQ No. 10-04-01 MAY 2 6 2010 MEt) ~ll frYl CITY OF SUNNY ISLtS BEACH OFFICE OF THE CITY CLERK Dear Mr. Conner and Members of the Selection Committee: On behalf of NUTIING ENGINEERS OF FLORIDA, INC., I would like to thank you for the opportunity to present our qualifications to you in response to the Request for Qualifications for Professional Engineering Services. In this submittal we will be presenting our qualifications to provide Geotechnical Engineering, Construction Materials testing services, Structural Inspections and Environmental Assessment Services. BUSINESS OVERVIEW NUTIING'S Doral office/laboratory will be responsible for servicing the projects for this contract. Our Boynton office is able to provide back-up services, if needed. Having multiple offices enables us to better serve our clients' needs in a rapid responsive manner. The CONTACT INFORMATION is as follows: 2051 NW 112th Avenue, Suite #126 Miami, Florida 33172 Phone: 305-824-0060 Fax: 305-824-8827 Email: paulc@nef.cc Mr. Paul Catledge, P.E., Senior Project Engineer Since 1967, Nutting Engineers has been providing professional geotechnical engineering, construction materials testing, inspections and environmental services to thousands of municipal projects throughout South Florida. The success of our company does not come from our size but from our overall commitment to the satisfaction of our customers. Our project managers strive to complete each project, efficiently and on or before project deadlines. Because of these work ethics over 90% of our business comes from repeat clients. Our relationship with these numerous public agencies/municipalities proves we have a strong history of performing our duties to the utmost satisfaction of our public sector clients. NUTIING's vast government contract experience in Florida gives us the expertise and familiarity with guidelines and protocols to provide our services as requested by The City of Sunny Isles Beach. These contracts are all qualifications based selections (CCNA) most dating back twenty years of continuous service. Based on this experience, we are very familiar Florida's regulatory agencies codes and regulations. Project types we have completed include airports, seaports, roadways (improvements, widening, extensions, lighting, guard rails), bridges, parking lots and garages, drainage systems, city halls and municipal buildings, parks, recreational facilities, hospitals, educational facilities (K-12 and higher educational facilities) including auditoriums, stadiums/sports facilities, water and wastewater treatment plants, water storage facilities, courthouses, industrial parks, mining operations, shopping centers, residential communities, hotels, assisted-living facilities, high-rise condominiums and office towers, and communication towers. 2051 NW 112TH STREET, SUITE #126. MIAMI, FLORIDA 33172. PHONE (305)824-0600. FAX (305) 824-8827 Palm Beach (561) 736-4900 · Broward (954) 941-8700 . 51. Lucie (772) 408-1050 FINANCIAL STATUS Nutting Engineers of Florida, Inc. has been in business continually in South Florida for the past 43 years. Nutting has never filed for bankruptcy, nor has there been any liens placed against the company. Due to the economic downturn within the last 2 '12 years, Nutting has not grown in revenue, but we have managed to steadily maintain approximately $6 million per year in revenue. We have included a quarterly balance sheet from the first quarter of 2010 for review by the evaluation committee. However, Nutting is a privately owned company and due to this fact, we wish for these documents to remain Confidential and not be submitted for public record. Should The City of Sunny Isles require compete financial statements, they can be provided under separate sealed cover, marked CONFIDENTIAL for the inspection and examination by the appropriate staff prior to evaluation rating. ENGINEER IN CHARGE Mr. Paul Catledge, P.E. will be the primary contact person responsible for this contract. He will be your main contact person for all projects assigned to Nutting Engineers. As Senior Engineer and the Miami Division Manager, Mr. Catledge assumes responsibility for engineering projects as well as our in-house Quality Assurance/ Quality Control (QA/Qc) program and has the authority to oversee this contract. Mr. Rick Wohlfarth, P.E., Principal of our firm will provide project overview and consultation on all projects. With over 21 years experience, Mr. Wohlfarth reviews all geotechnical reports and materials testing reports before they are completed and mailed to the client. This "double signature" policy on reports serves as better quality control for the company and enables a principal/owner to review every final report before it is delivered to the client. Why Choose Nutting? >- A reputable, 43 year old established firm with local office & laboratory located in Miami-Dade County >- Completion of Thousands of Public and Private projects throughout South Florida by staying within necessary timelines and budgets with proven customer satisfaction from our clients >- Trained field personnel qualified to deliver the full scope of services requested of this contract. Personnel certifications are through American Concrete Institute (ACI), Masonry Inspectors, Florida Building Codes & Standards, Florida Department of Transportation (FDOT), Troxler Nuclear, & South Florida Water Mgmt. District >- In-house drillers, technicians, laboratory personnel and equipment. >- Educated, committed, experienced personnel with the commitment to provide you with accurate test results, value engineering and respect to the needs of the project budget, deadline and team members. >- A promise to provide the most cost effective, comprehensive and professional services and solutions possible COMPANY OWNERS/FINANCIAL INTEREST IN FIRM Mr. Richard. G. Iossi, P.E. President 1310 Neptune Drive Boynton Beach, Florida 33426 (561) 736-4900 Mr. Richard C. Wohlfarth, P.E. Vice President 1310 Neptune Drive Boynton Beach, Florida 33426 (561) 736-4900 Mr. James J. Flaig, P.E. Vice President Same as Above Mrs. Elizabeth Butler Secretary/Treasurer Same as Above Thank you for the opportunity to submit our qualifications to the City of Sunny Isles Beach. As outlined, we have the essential combination of commitment, local resources, ability and qualifications to meet the needs of your City. We look forward to being a part of your team. Respectfully submitted, NU~I~G lNGj~EE~S OF FLORIDA, INC. i~Wv/J~ Richard C. Wohlfarth, P.t Principal/Vice President "Since 1993, we have counted on them repeatedly to provide their services professionally, within the given timelines and within the budget... field personnel are courteous, reliable and experienced... project managers and engineers are responsive and efficient." Thomas Sirna, P.G. Solid Waste Authority, PBC ...j~ Nutting J. ~~~~~;~~~~~ SECTION 2 LIST OF GOVERNMENT PROJECTS FOR LAST FIVE YEARS NUTTING ENGINEERS OF FLORIDA, INC. is a geotechnical engineering/testing and environmental company, we have the capability of working on numerous projects simultaneously. When we compiled the list, we had over 900 government projects (between all three offices) that we have completed within the last five years. Below is a condensed version of the projects that the Miami office has completed over the past 5 years. CLIENT PROJECT DATE SCOPE OF WORK PROJECT ENGINEER Grace & Naeem Uddin, Inc. Port of Miami New Cruise Terminal 2010 Geotechnical engineering svcs. P. Catledge Canopy Terminals B & C Biscayne Housing Group, Inc. Bonita Cove Townhomes NW 2nd Ave., Miami, FL 2010 Geotechnical engineering svcs. R Wohlfarth Teatro Marti Apartments-SW 8th Ave., Miami, FL 2009 The School Board of Broward Brow. Fire Academy Replacement Burn Facility, Davie 2010 Geotechnical engineering svcs. P. Catledge Co. Hundreds of projects since 1985 (QSS contract) Construction materials testing R Wohlfarth Environmental Assessments J. Beernink Walters Zackria & Associates Topeekee Yungee (T.Y.) Park-Hollywood 2010 Geotechnical engineering svcs. P. Catledge Markham Park Restroom - Weston City of Coral Springs WTP admin bldg. add. Miami Dade Public Schools Poinciana Park Elementary School 2010 Geotechnical engineering svcs. P. Catledge Hundreds of schools from 2000 . present Construction materials testing RWohlfarth Special inspection services J.Beernink Environmental Assessments City of Hollywood Depl. of Lift Station A-3, A-5, A-8, A-6, W-17, W-26 2010 Geotechnical engineering svcs. P. Catledge Public Utilities Numerous locations, Hollywood, FL Waste Management, Inc. Waste Management - Medley & 12 acre & 6 Acre 2010 Geotechnical engineering svcs. P. Catledge parcels - Medley Construction materials testing Environmental Assessment Miami Children's Hospital Bed Tower & Modular Cath Lab, Miami, FL 2010 Geotechnical engineering svcs. P. Catledge Construction materials testing Threshold inspection services BCC Engineering Traffic Circle & Pedestrian Crossing 2010 Geotechnical engineering svcs. P. Catledge Town of Palmetto Bay Construction materials testing Mathews Consulting Central Cudjoe Reg. Wastewater Collection System 2010 Geotechnical engineering svcs. P. Catledge Summerland Key, Monroe Co., FL Chen and Associates NE 173rd Sl. Roadway Improvements, N. Miami Bch 2009 Geotechnical engineering svcs. P. Catledge NE 18th Ave. Improvements, N. Miami Bch Miami Dade Aviation Kendall Tamiami Executive Airport 2009 Geotechnical engineering svcs. P. Catledge Department Runway 9R (Kendall/Tamiami Airport) 2008 Construction materials testing R Wohlfarth Numerous projects since 2001 Special/threshold inspections J. Beernink Environmental assessments City of Miramar Miramar overflow parking facility 2009 Geotechnical engineering svcs. P. Catledge Miramar, FL Construction materials testing Environmental Assessment Calvin Giordano & Associates Johnson Street Intersection Improvements 2009 Geotechnical engineering svcs. P. Catledge Hollywood, FL Construction materials testing Eckler Engineering City of Tamarac Water Treatment Plant 2009 Geotechnical engineering svcs. P. Catledge T amarac, FL Construction materials testing Miami Dade General Services Joseph Caleb Center Property 2010 Geotechnical engineering svcs. P. Catledge Administration Miami, FL Construction materials testing Threshold inspection services Chen & Associates Key West Class I Solid Waste Transfer Station 2009 Geotechnical engineering svcs. P. Catledge Monroe Co., FL Construction materials testing Threshold inspection services ...j~ Nutting J. ~~~~~~~~~ Town of Davie Pine Island Park Multi Purpose Center 2009 Geotechnical engineering svcs. P. Catledge Davie, FL Construction materials testinq Memorial Healthcare Systems Memorial Hospital West Cancer Institute, Cyber Knife 2009 Geotechnical engineering svcs. R. Wohlfarth Expansion, Parking Garage & Cancer Center Construction materials testing Numerous projects since 1996 Threshold inspection services Pembroke Pines, FL CH2M Hill Overseas Highway Expansion Project 2008 Geotechnical engineering svcs. P. Catledge Monroe County, FL Construction materials testing City of Tamarac Public Works City Wide Culvert Improvement Project 2008 Geotechnical engineering svcs. R. Wohlfarth Department -Multiple Locations Construction materials testing Tamarac, FL Cubellis Sunny Isles Beach Government Center 2008 Geotechnical engineering svcs. P. Catledge Sunny Isles Beach, FL Islamorada, Village of Isles Village Hall/ Fire Station #21, Islarnorada, FL 2008 Geotechnical engineering svcs. P. Catledge Construction materials testing special/threshold inspections Miami-Dade County Port of Miami Rip Rap Project at Pilot Station 2007 Geotechnical engineering svcs. R. Wohlfarth Public Works Department Miami-Dade, FL North Key Largo Utility Corp. Key West Solid Waste Transfer Station, Rockland 2009 Geotechnical engineering svcs. P. Catledge & Chen & Associates Key, FL Construction materials testing R. Wohlfarth special/threshold inspections. City of North Lauderdale Fire Station #34 Drainage Evaluation 2008 geotechnical engineering svcs. R. Wohlfarth North Lauderdale, Florida Construction materials testing. Sunny Isles Fire Rescue Dept. Sunny Isles Fire Rescue Station #10 2007 Geotechnical engineering svcs. R. Wohlfarth Construction Materials Testing City of Sunny Isles Atlantic Isle Utility and Road Improvements 2007 Geotechnical engineering svcs. R. Wohlfarth c/o Calvin Giordano & Associates Sunny Isles, Florida City of Sunny Isles Sunny Isles Gymnasium 2006 Geotechnical engineering svcs. R. Wohlfarth Construction materials testing J. Flaig Threshold Inspections Miami Dade Water & Sewer Dept. ER-15496 Intersection Improvements 2006 Geotechnical engineering svcs. R. Wohlfarth Construction materials testing Miami-Dade Parks & Rec. Dept. Various locations, Miami 2006 Geotechnical engineering svcs. R. Wohlfarth (a) Buccaneer Park (b) South Dade Greenways Park Construction Materials Testing J. Beernink (c) Black Point Marina, (d) Pelican Harbor Marina Environmental Assessments (e) Southern State Park Florida Keys Aqueduct Authority Various Projects - Florida Keys Aqueduct Authority- 1995- Geotechnical engineering svcs. P. Catledge Multiple Locations, Florida 2010 Construction materials testing R. Wohlfarth Numerous projects since 1995 Environmental services J. Beernink Chen & Associates South Point Row, Phases III, IV & V Right of Way 2006 Geotechnical engineering svcs. R. Wohlfarth Infrastructure Improvement project Construction materials testing- Miami, Beach, Florida asphalt cores Calvin Giordano & Associates Miami Beach Row Infrastructure Improvements 2006 40,000 L.F. of water mains R. Wohlfarth Approx. from 65th St. & 85th St. to Collins Ave. & Geotechnical engineering svcs. Intracoastal Waterway Construction materials testing Miami Beach, FL Laboratory analyses CH2M Hill City of Miami Beach Neighborhood No.8 2006 Geotechnical engineering svcs. R. Wohlfarth Bayshore/Sunset Islands Construction materials testing- Miami Beach, FL asphalt cores, laboratory testing ~~~~~ SECTION 2 REFERENCES Grace & Naeem Uddin, Inc. Mr. Vladimir Jeanott vlad@qnuinc.com 954-693-0620 Miami Dade Aviation Department Mr. Tyrone Brown 305- 876-0529 Mr. Joaquin Menendez 305-869-1329 Biscayne Housing Group, Inc. Ms. Genie Anderson 305-372-5791 Sunny Isles Fire Rescue Department Ms. Margarita Garces 986-331-4518 The School Board of Broward County Mr. Joe Delillo 754-321-1658 Miami Dade General Services Administration Mr. Alex Rodriquez 305-375-5965 Walters Zackria & Associates Mr. Abbas Zackria rswaia@bellsouth.net 954-522-4123 Chen & Associates Mr. Oscar Bello, PE obello@chenandassociates.com 786-497 -1500 x 104 City of Hollywood Public Utilities, Engineering & Construction Services Ms. Susan Goldberg sqoldberq@hollvwoodfl.orq 954-921-3993 CH2M Hill Mr. Andrew Smyth 305-294-1645 Mr. Pilar Doran 561-515-6500 Pilar.Doran@CH@M.com Miami Dade Public Schools Ms. Nancy Tobin 305-995-2423 Mr. Jose Velez 305-995-4835 C3TS Ms. Melina Corzo 305-445-2900 melinac@c3ts.com Mr. Jeffrey Crews 954-565-2113 icrews@c3ts.com Waste Management, Inc. Mr. Luke Debock 954-984-2029 Idebock@wm.com Memorial Healthcare Systems Mr. Joe Alcure 954-433-7184 ialcure@mhs.net Miami Children's Hospital Mr. Robert W. Nowlan 305-668-5519 City of Tamarac Public Works Department Mr. Alan Lam 954-597-3707 BCC Engineering Mr. Shahin Hekmat 305-670-2350 shekmat@bcceng.com Miami-Dade County Public Works Department Ms. Becky Hope 305-347-4890 City of Miami Beach Mr. Keith Mizell 305-673-7000 x. 6972 City of Miramar Ms. Bissy Vempala 954-602-3320 bvempala@ci.miramar.fl.us Eckler Engineering Mr. Doug Hammann 954-510-4700 Mr. Evan Kennedy Calvin Giordano & Associates Ms. Sabrina Baglieri 954-921-7781 Mr. Alfonso Orellana aorellana@calvin-qiordano.com Mr. Glen Harrelson qharrelson@calvin-qiordano.com Miami-Dade Parks & Recreation Department Mr. Wally Lucky 305-775-7860 Miami Dade Water and Sewer Department Mr. Rick Ziel 305- 547-7004 Mathews Consulting Mr. David Mathews 561-478-7961 Florida Keys Aqueduct Authority Mr. James Reynolds 305-296-2454 City of Marathon Public Works Mr. Carlos Solis, P.E. 305-289-5008 solisc@ci.marathon.fl.us 8;i~ I ADDITIONAL PROJECT EXPERIENCE PROJECT: Naranja Lakes Site, 8-acre parcel Vicinity of SW 280th Street & SW 149th Avenue Homestead, FL CLIENT/OWN ER: Private Developer / Miami-Dade Public Schools COMPLETION DATE/STATUS: 2009 NUTTING'S FEES: $40,000 This property was intended to be donated to the school board by a developer. Nutting worked very closely with Miami-Dade County DERM and Miami-Dade Public Schools on this site. Through our Environmental assessments we discovered the site was backfilled with unsuitable materials including construction materials, car parts and vegetative matter, etc. The materials resulted in elevated concentrations of ammonia and iron exceeding groundwater target clean up target levels and the presence of methane in the subsurface. Groundwater and methane monitoring was performed at this site requested by MDERM. Given the presence of these contaminants, construction of the school over the area of contamination was not recommended. However through sub division of the property and Nutting's recommendation to address methane migration concerns from the area of contamination through the installation of a moat around the area of contamination, development of the remainder of the parcel as an educational facility was approved by MDERM. Additional services performed at the site included the installation of twenty two-inch diameter shallow monitoring wells for groundwater and methane analyses. The wells were installed utilizing the Hollow Stem Auger Methodology. Each well was installed to approximately eleven feet below land surface with one foot of casing and a ten foot of well screen. A filter sand media was placed around the well screen, followed by a transitional layer of betonite seal with neat grout from the betonite seal to top of the monitoring well. Final completion included an eight-inch diameter manhole set in a two foot by two foot concrete pad and aluminum stand pipe. Furthermore, Nutting Engineers performed a preliminary geotechnical exploration including the performance of three twenty-foot deep standard penetration test borings in an effort to further evaluate subsurface conditions for load bearing capacity and foundation design recommendations. 8r~~~~~ RELATED PROJECTS (Cost Control Examples) "'" Project Name: Location: Client: Scope of Work: Size: Nutting's Fee's Crosspoint Elementary School (school 98-1) Congress Avenue, Boynton Beach, Florida The School District of Palm Beach County Mr. Bill Cusano, Sr. Projects Administrator Phone: (561) 668-7606 Geotechnical engineering, construction materials testing and special structural inspection services 18-acre, 2-story 100,000 sf elementary school building $75,000 Palm Beach County School District is one of the many School Districts in which Nutting has had a Qualification Based Contract for Geotechnical Engineering, Construction Materials Testing and Structural (Special! Threshold) Inspections and Environmental Services. Nutting was brought in to consult on a project that the School District was on the brink of abandoning due to the significant cost associated with a demucking-refilling operation of heavy peat deposits located on the site. Nutting's principal chief engineer, Jim Flaig, offered a cost saving recommendation that the School District planners consider relocating the main building to the area with no peat to shallow depth of organics and to move the large storm water retention area to the west side of the site, in the area of the deep muck. The planners determined that this would be an excellent solution and the School District finalized the site purchase. The Cost-Control Solution saved the School District substantial amounts of money and fees already expended on the acquisition of the current site and if needed, an alternative site as well as the future cost of demucking-refilling had they decided to proceed with the original layout. Nutting provided services through completion of the project by monitoring and testing the site development and building pad preparation activities, the materials testing and inspections of the tilt wall construction- all on time, on schedule and within the budget. 8r~~lb~ SECTION 3 FLORIDA BUSINESS & ENGINEERING LICENSE State of Florida Department of State I certifY from the records of this office that NUTTING ENGINEERS OF FLORIDA INC is a corporation organized under the laws of the State of Florida, filed on February 16, 1967. The document number of this corporation is 313874. I further certifY that said corporation has paid all fees due this office through December 31, 2010, that its most recent annual report was filed on February 1,2010, and its status is active. 1 further certifY that said corporation has not filed Articles of Dissolution. Gi,'efl uflder fill' Ilafld afld tile Great Seal of Florida, at Tallallassee. tile Capital. tllis tile First day of February., 2010 ~ SecretalY of State Auth.nlication ill: 400167679454-020110-313874 To authenticate this certificate...i~it the following site, enter this ID. and then follow the irotructions diaplayed. h ttps://efile.suD biz.org/certau tit \'er.h 001 ~tat~/tl Board of / Nuttin! . ~ Is aulhorized under the provisions of s~.~ - to the public through a Professional Engiri'e~ Expiration: 28.Feb-11 Audit No: 22820110616 Certificate of Authorization CA~O: 606 DISPLAY AS REQUIRED BY LAW ..j~ Nuning ~ ~~~~J~~~~ ; ~ I SECTION 5 CONTACT PERSON Mr. Paul Catledge, P.E. Division Manager Engineer in Charge CONTACT INFORMATION: 2051 NW 11th Avenue, Suite #126 Miami, Florida 33172 Phone: (305) 824-0600 Cell Phone: (561) 414-4393 Fax: (305) 824-8827 Email: paulc@nef.cc FORMAL EDUCATION: Louisiana State University Bachelor of Science - Civil Engineering PROFESSIONAL REGISTRATIONS: Registered Professional Engineer State of Florida #68448 Troxler Nuclear Gauge OSHA Safety Hazardous Materials Certificate PROFESSIONAL AFFILIATIONS: Florida Engineering Society American Society of Civil Engineers REFERENCES: Mr. Joaquin Menendez Miami-Dade Aviation Department Environmental Engineering Division P.O. Box 592075 Miami, Florida 33139 (305) 876-0799 Mr. Bill McCain W. F. McCain & Associates, Inc. 1171 19th Street Vero Beach, Florida 32961 (772) 770-1093 Ms. Juliana Yepes Miami Children's Hospital Construction Management 3100 SW 62nd Avenue Miami, Florida (786) 624-5886 PROFESSIONAL EXPERIENCE: Mr. Catledge serves as a Project Engineer and Division Manager of the Miami office of Nutting Engineers of Florida, Inc. Mr. Catledge has a total of six years experience in the civil/geotechnical engineering field and two years as the Division Manager of the Miami office. His responsibilities include preliminary site studies, geotechnical explorations to determine site preparation, feasibility studies for land development, foundation design analysis and recommendations, supervision and training of drill crews, workload analysis, observation of piling installations, pile load tests, classification of in-situ soils, and field/laboratory materials testing. Mr. Catledge's experience includes construction layout, collection of field data, layout of structures, buildings and roads and ensuring quality of work being performed in the field by maintaining correspondence between the office and the contractor. He has provided supervision and monitored installation of deep foundation piles as well as conducted soil tests and compressive strength testing for many projects throughout Miami-Dade County. Mr. Catledge has served as project manager for numerous government projects including the Key West Solid Waste Transfer Station, Broward County Board of County Commissioners and Miami-Dade County Public Works and school districts of Broward, and Miami-Dade Counties. PROJECT EXPERIENCE: · Overtown Transit Village, Downtown Miami · FIU School of International Studies · FlU Football Stadium · 1450 Brickell Office Building, Miami · Aventura Mall Expansions & Parking Garage, Aventura · Twin Spans I -10 Bridges, Slidell, LA · Rego Park Mall and Residential, Queens, NY · Gulfstream Park Parking Garage · Seminole Tribe of Florida Airport Runway, Big Cypress · Seminole Tribe of FL Water Treatment Plant, Hollywood · Miami Children's Hospital, Miami · Dolphin Stadium Expansion, Miami · Fontainebleau Hotel, Miami Beach · Atlantic Trash & Transfer Facility Expansion · Key West Class I Solid Waste Transfer Station · MIA Runway 8R & 26L improvements 4.:\ Huning ~ 25~~~~.~~~~~ SECTION 6 LIST OF PERSONNEL UALIFICATIONS & EXPERIENCE Years of Exp. Current Position! Staff Primary Role Qualifications Total PERSONNEL Paul Catledge, P.E. Engineer in B.S. Civil Engineering ChargelDivision Reg. Prof. Engineer #68448 Manager Troxler Nuclear Guage 2/6 X X X X X X X X OSHA Safety Hazardous Materials Certificate Richard C. Principal/ B.S. Civil Engineering Wohlfarth, P.E. Director of Reg. Prof. Engineer #50858 Engineering Reg. Bldg. Inspector BN#3580 SBCCI #6538 16/21 X X X X X X X ACI Level 1 #991175 UBCI James J. Flaig, Principal/Chief M.S.. Civil Engineering-Soil P.E. Engineerlln house Mechanics/Foundations Consultant B.S Civil Engineering Reg. Prof. Engineer #21083 25/40 X X X X X X X X X X X X X X X Threshold Inspector #606 SFWMD Water Well Contractor Pavel Cruz Field Operations ACI Concrete Tech. Level 1 Manager Nuclear Moisture Density Guage Operator CMEC Concrete Cylinder 4/8 X X X X Testing Technician Jan Beernink Sr. Environmental M.S. Environmental Project Mgr. Science/Chemistry OSHA Health & Safety Training 8/12 X X X X for Hazardous Waste Sites ~)~~~~~~~ ARCHITECT - ENGINEER QUALIFICATIONS PART 1 - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION ,. TITLE AND LOCATION (City and State) Professional Engineering Services- City of Sunny Isles Beach, Miami-Dade County 2. PUBLIC NOTICE DATE 13. SOLICITATION OR PROJECT NUMBER May 2010 RFQ NO. 10-04-01 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Mr. Paul Catledge, P.E. 5. NAME OF FIRM Nutting Engineers of Florida, Inc. 6. TELEPHONE NUMBER 17. FAX NUMBER la. E.MAIL ADDRESS 305-824-0060 305-824-8827 paulc@nef.cc C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) ( Check) 0:: '0:: LU ZO LU Z 0 f- 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT :;; f- '-' '-' ~~ <DO<: n: ~o:: 0- ....,0- "'f- v" Nutting Engineers of Florida, 2051 NW 112th Avenue Geotechnical Engineering, Inc. Suite 126 Construction Material Testing, a. Miami, Florida 33172 Structural Inspections Environmental Assessments v"1 CHECK IF BRANCH OFFICE b. - CHECK IF BRANCH OFFICE C. I CHECK IF BRANCH OFFICE d. II CHECK IF BRANCH OFFICE e. n CHECK IF BRANCH OFFICE f. r-l I I CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM o (Attached) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) PAGE AC-1 12. NAME Paul Catledge, P.E. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13. ROLE IN THIS CONTRACT Senior Project Engineer- Main POC a. TOTAL 6 14. YEARS EXPERIENCE Tb. ~ITH CURRENT FIRM 15. FIRM NAME AND LOCATION (City and State) Nutting Engineers of Florida, Inc., Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) Louisiana State University Bachelor of Science Civil Engineering 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer Registered in the State of Florida #68448 Troxler Nuclear Gauge 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards, etc.) State Certified Building Inspector, UBCI Certification, ACI Level I, Florida Engineering Society, Treasure Coast Chapter and Broward Chapter (Past President), Treasure Coast Builders Association, Red Cross First Aid and CPR 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Various K-12 schools, Miami Dade and Broward County School Districts PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) Broward County, Florida 200): 1986 ongoing (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc.) AND SPECIFIC ROLE IL Check if project pertormed with current firm a. Perfonning geotechnical exploration/engineering services, construction materials testing, and special inspection services, phase I and Phase II environmental property assessments for dozens of schools and ancillary structures throughout Miami Dade and Broward Counties. Qualification Based Contract from 200 I to present in Miami Dade, 1986 to present in Broward. (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED Memorial Regional Hospital Miramar Expansion-various buildings PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) Hollywood, Florida Ongoing Ongoing (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc.) AND SPECIFIC ROLE '.,/ I Check if project pertormed with current firm b. Perfoming geotechnical engineering/exploration services, pile load tests, pile installation monitoring, jet grouting underpin monitoring, construction materials testing, special inspections services. $150,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami-Dade International Airport, multiple projects listed below PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) Miami, Florida 2003 ongoing (3) BRIEF DESCRIPTION (Briel scope. size. cost, etc.) AND SPECIFIC ROLE 1.,/ , Check If project pertormed with current firm C. Geotechnical exploration/engineering services, construction materials testing and/or special/threshold inspection services. Projects include Tenninal D, North Tenninal Development Program 7, Taxiway E & F re-surfacing, taxilane settlement investigation, fuel hydrant repair at Gate H, multiple centerlight repair(s), (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Various Projects for City of Hollywood, listed below PROFES~IONAL SERVICES I CONSTR~CTION (II applicable) Hollywood, Florida ongomg ongomg (3) BRIEF DESCRIPTION (Briel scope, size. cost. etc.) AND SPECIFIC ROLE ~ Check if project pertormed with current firm d. Geotechnical engineering/exploration, foundation analyses, pile load tests, pile installation monitoring, construction materials testing (soil, concrete, mortar, grout), structural inspections, and/or various environmental services. Projects include the Young Circle Parking and traffic improvement project, Garfield Street Parking Garage, Charnow Park, Dowdy Field, Rotary Park Improvements, Raw Water Piping Floridan, Water Main Replacement Program, Hollywood (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Key West Solid Waste Transfer Station, Rockland Key PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Key West, Florida 2007 2009 (3) BRIEF DESCRIPTION (Briel scope. size, cost. etc.) AND SPECIFIC ROLE l.iJ Check if project performed with current firm e. Perfonned geotechnical investigation and engineering services, construction materials testing and special/threshold inspection services for new transfer station on 4 acres to inc. truck tunnels, cardboard recycling building, office and maintenance building, leachate storage building, scale house, parking, $130,000 STANDARD FORM 330 (6/2004) PAGE E-1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Richard C. Wohlfarth, P.E. Principal/ Director of Engineering a. TOTAL I b. WITH CURRENT FIRM 20 15 15. FIRM NAME AND LOCATION (City and State) Nutting Engineers of Florida, Inc. 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) University of Florida - B.S. Civil Engineering Florida Professional Engineer #50858 Registered Building Inspector BN #3580 SBCCI #6528 ACI Level I, UBCI 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Ttaining. Awards. etc.) State Certified Building Inspector, UBCI Certification, ACI Level I, Florida Engineering Society, Treasure Coast Chapter and Broward Chapter (Past President), Treasure Coast Builders Association, Red Cross First Aid and CPR 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Cudjoe Key Waste Water Transmission Main PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida Keys, FL 2008 2008 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE .L Check if project perlormed with current firm a. Nutting performed geotechnical engineering and exploration services - standard penetration test borings plus drilling on hydraulic spud barge, SWFMD exfiltration tests, soil c1assifiation and laboratory analysis, sieve analysis. The scope of work included the construction of a regional waste water transmission system consisting of 87,000 lineal feet of transmission main pipeline (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FKAA Lower Keys Waste Water Collection System PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida Keys, FL 2008 2008 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE :{"j Check if project perlormed with current firm b. Nutting performed geotechnical engineering and exploration services - standard penetration test borings plus drilling on hydraulic spud barge, SWFMD exfiltration tests, soil c1assifiation and laboratory analysis, sieve analysis. The scope of work included performing one 15' spt at approximately 51 lift stations and 44, 10' spts along the gravity sewer line routes. The gravity (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED Ft Lauderdale International Airport Master Plan PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Fort Lauderdale, FL 2008 2009 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project perlormed with current firm C. Geotechnical engineering & exploration services, soil and groundwater testing/analysis, construction materials testing. Testing included standard penetration test borings, auger borings, shelby tubes, SFWMD exfiltration tests, double ring infiltration tests, soil suction (tension meter) tests, manual test borings, sieve analysis with hydrometer, specific gravity, and (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Key West Class I Solid Waste Transfer Station PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Rockland Key, FL est 2009 est 2009 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE L Check if project perlormed with current firm d. Geotechnical engineering and exploration services, construction materials testing, and threshold inspection services $200,000 Director of Engineering (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Palmetto Park Road & C-1 Canal Culvert Replacement Prj. PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) #2003907 2007 2007 (3\ BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE L Check if project perlormed with current firm e. Construction materials testing including soil densities for basecourse, backfill, pipe backfill, curb pads, storm drain pipe backfill and modified proctor densities tests. $2,300 Director of Engineering STANDARD FORM 330 (6/2004) PAGE E-2 12. NAME Pavel Cruz E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13. ROLE IN THIS CONTRACT Field Operations Manager a. TOTAL 14. YEARS EXPERIENCE lb. WITH CURRENT FIRM 8.7 15. FIRM NAME AND LOCATION (City and State) Nutting Engineers of Florida, Inc., Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) High School Graduate Certified ACI Concrete Technician Level I Certified Nuclear Moisture Density Gauge Operator CMEC Concrete Cylinder Testing Technician 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. etc.) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SDWWTP HLD Upgrades, MIami Dade County Water and Sewer Dept. PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 ongoing a. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE ...LJ Check if project performed with current firm Performing geotechnical engineering and construction material testing services for upgrades at various areas of the WTP inc. OSHG (on site hypochlorite generation), south filter system building, access road, pump station, fire hydrant line. Construction Services Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Concourse "C" Tunnel, Concourse "J" and other misc. projects PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami-Dade Intemational Airport, Miami 2006 2007 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm b. Geotechnical engineering/exploration services, construction materials testing and inspections at various projects at the airport including a new concourse, tunnel and associated drive areas. Construction Services Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Multiple Roadway Improvement projects, Miami Dade County Public PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Works Department 2002 ongoing c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Perfonned geotechnical engineering/exploration services, construction material testing, and/or inspections. Construction Services Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Biscayne Court Section 8 Housing, Miami PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 2009 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm d. Perfonned geotechnical engineering and construction material testing services for 7-story 16,800 SF residential building supported on 180 piles and associated parking and drive areas. Construction Services Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED A ventura Mall Concourse Expansion & Parking Garage PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) A ventura 2007-2009 2010 (3) BRIEF DESCRIPTION (Brief scope. size. cost. ete.) AND SPECIFIC ROLE L Check if project performed with current firm e. 2-story mall expansion & 4-story parking garage addition. Engineering Services, construction materials testing including soil density tests, various laboratory testing, concrete compressions tests, grout prisms, and threshold inspection services. Construction Services Manager STANDARD FORM 330 (6/2004) PAGE E-3 12. NAME Jan Beernink E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Comp/ete one Section E for each key person.) 13. ROLE IN THIS CONTRACT Senior Project Manager a. TOTAL 6.3 14. YEARS EXPERIENCE Tb. WITH CURRENT FIRM 6.4 15. FIRM NAME AND LOCATION (City and State) Nutting Environmental of Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) De Vrije Universiteit Amsterdam The Netherlands 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) OSHA Health & Safety Training for Hazardous Waste Sites Masters of Science in Environmental Science/Chemistry 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. etc.) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Wilton Park Site (Former All Automotive Repair Facility) FDEP #06900661 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Wilton Manors, FL 33009 Ongoing Ongoing a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~~ Check if project performed with current firm Performed environmental services, limited soil and groundwater quality investigations, contaminated assessment report, site assessment report, soil borings and soil screening activities, monitored excavation, transport and disposal of 700 cubic yards of contaminated soils. Installed monitor wells, quarterly monitoring of groundwater, supervised and appliced ORC compound into excavation. $50,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Various K-12 schools Broward County School District PROFESSIONAL SERVICES l CONSTRUCTION (If applicable) Broward County, FL 1986 ongoing (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE L Check if project performed with current firm b. Performed geotechnical exploration/engineering services, construction materials testing, and special inspection services, phase I and Phase" environmental property assessments for numerous schools throughout Broward County. Qualification Based Contract from 1986 to present. $700,0000 Senior Project Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ives Estates Park (Former Ojus Landfill) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami-Dade Co., FL DERM SW-1179 ongoing (since 2003 ongoing (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE ~...J Check if project perlormed with current firm c. Phase I & Phase" Environmental property assessments, site assessment, monitor well installations, quarterly groundwater sampling - ongoing since 2003 $100,000 Senior Project Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Normandy Shores Golf Course PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami Beach, FL 9/2007 9/2007 (3) BRIEF DESCRIPTION (Brief scope. size. cosl. etc.) AND SPECIFIC ROLE .""J Check if project performed with current firm d. Performed environmental services, Installation of 2, 70' double cased monitoring wells, installation of 1, 120' double cased monitoring well, performance of soil borings, redevelopment of monitoring wells, groundwater sample collection, laboratory analysis of soil and groundwater for arsenic $25,000 Senior Project Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Solid Waste Authority 45th Street Landfill PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) West Palm Beach, Florida 2006 ongoing (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~~ Check if project performed with current firm e. Performed geotechnical engineering/exploration services. various enviromental impact studies, installation of monitor wells, stand pipes and concrete pads. $60,000 Senior Environmental Specialist STANDARD FORM 330 (6/2004) PAGE E-4 20. EXAMPLE PROJECT KEY NUMBER F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Como/ete one Section F for each oroiect.J 21. TITLE AND LOCATION (City and State) Miami Dade Board of County Commissioners 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2000 -Present Ongoing 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT Miami Dade County Various Tyrone Brown 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT This CCNA continuing services contract is one of our many continuing services contract. Since 2000, we have performed environmental services (Phase 1/11 Environmental Assessments), geotechnical exploration and engineering, construction materials testing and inspections as well as special! threshold inspections to various department of Miami Dade. Completed projects include, but not limited to: PUBLIC WORKS DEPARTMENT: Drainage studies & related improvements at Amerifjrst Park; Subdivisions: Zunjik States, Sleepy Holly, Nikis, Costa Brava, Crestview, Sunset Cove, Centruy Garden Village, Bibiana States; Port of Miami Rip Rap Project at Pilot Station, Roadway improvements at multiple locations FIRE RESCUE: Sunny Isles Beach Fire Station #10 Dolphin Station #68 Lifeguard Headquarters Main Facility Cutler Bay Fire Rescue Station #34 AVIATION DEPT: Miami N. side/concourse A Utility Corridor Runway Pavement Investigation at Opa Locka Airport c. POINT OF CONT ACT TELEPHONE NUMBER 305-876-0529 North Terminal Development Program 7478 MIA Taxiway Settlement Investigation Homestead General Airport Runway 9-27 Runway 12-30 Center Light repairs MIA MIA Taxiway E & F resurfacing PARKS AND RECREATION: Country Village Park Southern State Park Martin Luther King Jr. Park Miami Metro Zoo Rhino North Trail Park feeding exhibit Wild Lime Park Haulover Park Marina Eureka Park Field Home Pelican Harbor Marina 8ucaneer Park S. Dade Greenways Park Rock Ridge Park WATER AND SEWER: Sludge dewatering facility expansion at S.D.WWTP Emegency installation of 64-inch watermain South Miami High Water Treatment Plant Alexander Orr Underwater Treatment Plant Installation of 16-inch H.D.P.E. & 12-inch force mains at Bear Cut Channel South Miami Heights WTP perimeter wall & landscaping ER-47819 Florida Monitoring Well Installation SDWWTP HLD upgrades 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Nutting Engineers of Florida, Miami Dade, Florida Geotechnical Engineering Firm- full Inc. scope of services (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE F-1 20. EXAMPLE PROJECT KEY NUMBER F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects. if not specified. Com Jete one Section F for each ro 'ect. 2 21. TITLE AND LOCATION (City and State) Miami Dade Public School District- Various K-12 Schools, related items 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (/I applicable) ongomg ongomg 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT Miami Dade Public Schools Ms. Nancy Tobin 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Miami Dade Public School District is one of the many School Districts which we have a Qualification Based Contract for Geotechnical Engineering, Construction Materials Testing and Structural (Special! Threshold) Inspections and Environmental Services. We have held this contract since 2000, mere months after opening our Miami office! lab location. This award was especially gratifying since it was our first time presenting to that School District. Since 2000, we have maintained a presence on at least 2 sites at any given time. CURRENT ACTIVE PROJECTS: * New Prototype High School YYY- -300,000 SF (1,700 student stations) of new construction inc. administration, media center, electives and academic wings, food service, chiller building, PE shelter, teachers, parent and student parking, associated athletic courts and fields. Services include geotechnical engineering, monitoring services, materials testing and special! threshold inspections. * South Miami Middle School-project includes the installation of an 8" diameter PVC by approximately 600 foot long sanitary sewer line. Services include geotechnical engineering, monitoring services, materials testing and special inspections. c. POINT OF CONTACT TELEPHONE NUMBER 305-995-2423 * New Prototype High School HHH- -200,000 SF (2000 student stations) of new construction inc. administration, media center, academic wings, food service, stage and gymnasium, chiller building, PE shelter, teacher, parent and student parking, associated athletic courts and fields. Services include a Phase I and II environmental assessment, geotechnical engineering, monitoring services, materials testing and special! threshold inspections. * Miami Northwestern High School- construction of two cooling towers. Services include construction materials testing. ADDITIONAL: Coral Gables Senior High School Pine Villa Elementary School Caribbean Elementary School Florida City Elementary School Cutler Ridge Elementary School Bel-Aire Elementary School Our experience inc. classroom buildings, libraries, athletic buildings, affiliated fields, bill boards, concessions stands, parking & driving areas, associated land purchases, etc. Our overall experience in various Districts has made us comfortable with the guidlelines, expectations, challenges we could encounter & how to approach them. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Nutting Engineers of Florida, Inc. Miami Dade, Florida Geotechnical Engineering Firm- full scope of services (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE F-2 ARCHITECT - ENGINEER QUALIFICATIONS PART 1 - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Professional Engineering Services- City of Sunny Isles Beach, Miami-Dade County 2. PUBLIC NOTICE DATE 13. SOLICITATION OR PROJECT NUMBER May 2010 RFQ NO. 10-04-01 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Mr. Paul Catledge, P.E. 5. NAME OF FIRM Nutting Engineers of Florida, Inc. 6. TELEPHONE NUMBER 17. FAX NUMBER Is. E-MAIL ADDRESS 305-824-0060 305-824-8827 paulc@nefcc C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) ( Check) cr ,cr w ZO w Z Of- 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT ::;: f- Ll Ll ~~ m<{ oc ~cr 0.. ...,0.. UJf- ./ Nutting Engineers of Florida, 2051 NW 112th Avenue Geotechnical Engineering, Inc. Suite 126 Construction Material Testing, a. Miami, Florida 33172 Structural Inspections Environmental Assessments M CHECK IF BRANCH OFFICE b. D CHECK IF BRANCH OFFICE c. D CHECK IF BRANCH OFFICE d. II CHECK IF BRANCH OFFICE e. ~ CHECK IF BRANCH OFFICE f. n CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM o (Attached) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 612004 STANDARD FORM 330 (6/2004) PAGE AC-1 12. NAME Paul Catledge, P.E. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13. ROLE IN THIS CONTRACT Senior Project Engineer- Main POC a. TOTAL 6 14. YEARS EXPERIENCE I b. ~ITH CURRENT FIRM 15. FIRM NAME AND LOCATION (City and State) Nutting Engineers of Florida, Inc., Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) Louisiana State University Bachelor of Science Civil Engineering 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer Registered in the State of Florida #68448 Troxler Nuclear Gauge 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. O,ganizations. Training. Awards. etc.) State Certified Building Inspector, UBCI Certification, ACI Level I, Florida Engineering Society, Treasure Coast Chapter and Broward Chapter (Past President), Treasure Coast Builders Association, Red Cross First Aid and CPR 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Various K-12 schools, Miami Dade and Broward County School Districts PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Broward County, Florida 2001: 1986 ongoing a. (3) BRIEF DESCRIPTION (Briefscope. size. cost. etc.) AND SPECIFIC ROLE .vd Check if project performed with current firm Perfonning geotechnical exploration/engineering services, construction materials testing, and special inspection services, phase I and Phase II environmental property assessments for dozens of schools and ancillary structures throughout Miami Dade and Broward Counties. Qualification Based Contract from 200 I to present in Miami Dade, 1986 to present in Broward. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Memorial Regional Hospital Miramar Expansion-various buildings PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Hollywood, Florida Ongoing Ongoing b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Perfoming geotechnical engineering/exploration services, pile load tests, pile installation monitoring, jet grouting underpin monitoring, construction materials testing, special inspections services. $150,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami-Dade International Airport, multiple projects listed below PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami, Florida 2003 ongoing (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm C. Geotechnical exploration/engineering services, construction materials testing and/or special/threshold inspection services. Projects include Ternlinal D, North Tenninal Development Program 7, Taxiway E & F re-surfacing, taxi lane settlement investigation, fuel hydrant repair at Gate H, multiple centerlight repair(s), (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Various Projects for City of Hollywood, listed below PROFES~IONAL SERVICES I CONSTR~CTION (If applicable) Hollywood, Florida ongomg ongomg (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm d. Geotechnical engineering/exploration, foundation analyses, pile load tests, pile installation monitoring, construction materials testing (soil, concrete, mortar, grout), structural inspections, and/or various environmental services.Projects include the Young Circle Parking and traffic improvement project, Garfield Street Parking Garage, Charnow Park, Dowdy Field, Rotary Park Improvements, Raw Water Piping Floridan, Water Main Replacement Program, Hollywood (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Key West Solid Waste Transfer Station, Rockland Key PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Key West, Florida 2007 2009 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ,/. Check if project performed with current firm e. Performed geotechnical investigation and engineering services, construction materials testing and special/threshold inspection services for new transfer station on 4 acres to inc. truck tunnels, cardboard recycling building, office and maintenance building,leachate storage building, scale house, parking, $130,000 STANDARD FORM 330 (6/2004) PAGE E-1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Comp/ete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Richard C. Wohlfarth, P.E. Director of Engineering/ Principal-In-Charge a. TOTAL I b. WITH CURRENT FIRM 20.1 15.4 15. FIRM NAME AND LOCATION (City and State) Nutting Engineers of Florida, Inc. 16. EDUCATION (DEGREE AND SPECIALlZA TlON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) University of Florida - B.S. Civil Engineering Florida Professional Engineer #50858 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. etc.) State Certified Building Inspector UBCI Certification ACI Level 1 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Cudjoe Key Waste Water Collection System PROFESSIONAL SERVICES I CONSTRUCTION (/I applicable) Cudjoe Key, FL 2007 2007 (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ~~ Check if project performed with current firm a. Geotechnical engineering and exploration services $15,000 Director of Engineering/Project Engineer (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FKAA Lower Keys Waste Water Collection System PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) Florida Keys, FL 2008 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE l{J Check if project performed with current firm b. Nutting performed geotechnical engineering and exploration services - standard penetration test borings plus drilling on hydraulic spud barge, SWFMD exfiltration tests, soil classifiation and laboratory analysis, sieve analysis. The scope of work included performing one 15' spt at approximately 51 lift stations and 44, 10' spts along the gravity sewer line routes. The gravity sewer lines encompass approximately 150,000 lineal feet. $23,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ft. Lauderdale International Airport Master Plan PROFESSIONAL SERVICES I CONSTRUCTION (/I applicable) Fort Lauderdale, FL 2008 2009 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE l{J Check if project performed with current firm C. Geotechnical engineering & exploration services, soil and groundwater testing/analysis, construction materials testing. Testing included standard penetration test borings, auger borings, shelby tubes, SFWMD exfiltration tests, double ring infiltration tests, soil suction (tension meter) tests, manual test borings, sieve analysis with hydrometer, specific gravity, and natural moisture content. $48,155.00 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Key West Class I Solid Waste Transfer Station PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Rockland Key, FL 2009 2009 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE l{J Check if project performed with current firm d. Geotechnical engineering and exploration services, construction materials testing, and threshold inspection services for the construction of a new Class I Solid Waste Transfer Station and associated buildings, ramps and scales. $200,000 Director of Engineering (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Atlantic Isle Utility & Roadway Improvements PROFESSIONAL SERVICES I CONSTRUCTION (/I applicable) City of Sunny Isles, FL 2007 2007 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm e. Geotechnical engineering/exploration services and various laboratory testing $5,300 Director of Engineering STANDARD FORM 330 (612004) PAGE E-2 l 12. NAME Pavel Cruz E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13. ROLE IN THIS CONTRACT Field Operations Manager a. TOTAL 14. YEARS EXPERIENCE lb. WITH CURRENT FIRM 8.7 15. FIRM NAME AND LOCATION (City and State) Nutting Engineers of Florida, Inc., Miami, Florida 16. EDUCATION (DEGREE AND SPECIALlZA TlON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) High School Graduate Certified ACI Concrete Technician Level I Certified Nuclear Moisture Density Gauge Operator CMEC Concrete Cylinder Testing Technician 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. etc.) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SDWWTP HLD Upgrades, Miami Dade County Water and Sewer Dept. PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 ongoing (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~~ Check if project pertormed with current firm a. Performing geotechnical engineering and construction material testing services for upgrades at various areas of the WTP inc. OSHG (onsite hypochlorite generation), south filter system building, access road, pump station, fire hydrant line. Construction Services Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Concourse "C" Tunnel, Concourse "]" and other misc. projects PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami-Dade International Airport, Miami 2006 2007 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project pertormed with current firm b. Geotechnical engineering/exploration services, construction materials testing and inspections at various projects at the airport including a new concourse, tunnel and associated drive areas. Construction Services Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Multiple Roadway Improvement projects, Miami Dade County Public PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Works Department 2002 ongoing (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project pertormed with current firm C. Performed geotechnical engineering/exploration services, construction material testing,and/or inspections. Construction Services Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Biscayne Court Section 8 Housing, Miami PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 2009 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project pertormed with current firm d. Performed geotechnical engineering and construction material testing services for 7-story 16,800 SF residential building supported on 180 piles and associated parking and drive areas. Construction Services Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED A ventura Mall Concourse Expansion & Parking Garage PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) A ventura 2007-2009 2010 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE L Check if project pertormed with current firm e. 2-story mall expansion & 4-story parking garage addition. Engineering Services, construction materials testing including soil density tests, various laboratory testing, concrete compressions tests, grout prisms, and threshold inspection services. Construction Services Manager STANDARD FORM 330 (6/2004) PAGE E-3 12. NAME Jan Beernink E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13. ROLE IN THIS CONTRACT Senior Project Manager a. TOTAL 6.3 14. YEARS EXPERIENCE lb. WITH CURRENT FIRM 6.4 15. FIRM NAME AND LOCATION (City and State) Nutting Environmental of Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) De Vrije Universiteit Amsterdam The Netherlands 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) OSHA Health & Safety Training for Hazardous Waste Sites Masters of Science in Environmental Science/Chemistry 1a. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards. etc.) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Wilton Park Site (Former All Automotive Repair Facility) FDEP #06900661 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Wilton Manors, FL 33009 Ongoing Ongoing a. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE ...LJ Check if project performed with current firm Performed environmental services, limited soil and groundwater quality investigations, contaminated assessment report, site assessment report, soil borings and soil screening activities, monitored excavation, transport and disposal of 700 cubic yards of contaminated soils. Installed monitor wells, quarterly monitoring of groundwater, supervised and appliced ORC compound into excavation. $50,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Various K-12 schools Broward County School District PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Broward County, FL 1986 ongoing (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm b. Performed geotechnical exploration/engineering services, construction materials testing, and special inspection services, phase I and Phase II environmental property assessments for numerous schools throughout Broward County. Qualification Based Contract from 1986 to present. $700,0000 Senior Project Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ives Estates Park (Former Ojus Landfill) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami-Dade Co., FL DERM SW-1179 ongoing (since 2003 ongoing (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE :t'J Check if project performed with current firm C. Phase I & Phase II Environmental property assessments, site assessment, monitor well installations, quarterly groundwater sampling - ongoing since 2003 $100,000 Senior Project Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Normandy Shores Golf Course PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami Beach, FL 9/2007 9/2007 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm d. Performed environmental services, Installation of 2, 70' double cased monitoring wells, installation of 1, 120' double cased monitoring well, performance of soil borings, redevelopment of monitoring wells, groundwater sample collection, laboratory analysis of soil and groundwater for arsenic $25,000 Senior Project Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Solid Waste Authority 45th Street Landfill PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) West Palm Beach, Florida 2006 ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE L Check if project performed with current firm e. Performed geotechnical engineering/exploration services, various enviromental impact studies, installation of monitor wells, stand pipes and concrete pads. $60,000 Senior Environmental Specialist STANDARD FORM 330 (6/2004) PAGE E-4 20. EXAMPLE PROJECT KEY NUMBER F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Comolete one Section F for each oroject.) 21. TITLE AND LOCATION (City and State) Miami Dade Board of County Commissioners 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2000 -Present Ongoing 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami Dade County Various b. POINT OF CONTACT Tyrone Brown c. POINT OF CONTACT TELEPHONE NUMBER 305-876-0529 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT This CCNA continuing services contract is one of our many continuing services contract. Since 2000, we have performed environmental services (phase 1/11 Environmental Assessments), geotechnical exploration and engineering, construction materials testing and inspections as well as special/ threshold inspections to various department of Miami Dade. Completed projects include, but not limited to: PUBLIC WORKS DEPARTMENT: Drainage studies & related improvements at Amerifjrst Park; Subdivisions: Zunjik States, Sleepy Holly, Nikis, Costa Brava, Crestview, Sunset Cove, Centruy Garden Village, Bibiana States;Port of Miami Rip Rap Project at Pilot Station, Roadway improvements at multiple locations FIRE RESCUE: Sunny Isles Beach Fire Station #10 Dolphin Station #68 Lifeguard Headquarters Main Facility Cutler Bay Fire Rescue Station #34 AVIATION DEPT: Miami N. side/concourse A Utility Corridor Runway Pavement Investigation at Opa Locka Airport North Terminal Development Program 747B MIA Taxiway Settlement Investigation Homestead General Airport Runway 9-27 Runway 12-30 Center Light repairs MIA MIA Taxiway E & F resurfacing PARKS AND RECREATION: Country Village Park Southern State Park Martin Luther King Jr. Park Miami Metro Zoo Rhino North Trail Park feeding exhibit Wild Lime Park Haulover Park Marina Eureka Park Field Home Pelican Harbor Marina Bucaneer Park S. Dade Greenways Park Rock Ridge Park WATER AND SEWER: Sludge dewatering facility expansion at S.D.WWTP Emegency installation of 64-inch watermain South Miami High Water Treatment Plant Alexander Orr Underwater Treatment Plant Installation of 16-inch HD.P.E. & 12-inch force mains at Bear Cut Channel South Miami Heights WTP perimeter wall & landscaping ER-47819 Florida Monitoring Well Installation SDWWTP HLD upgrades 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Nutting Engineers of Florida, Miami Dade, Florida Geotechnical Engineering Firm- full Inc. scope of services (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE F-1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 pr:ojects, if not specified. Como/ete one Section F for each oroiect./ 21. TITLE AND LOCATION (City and State) Miami Dade Public School District- Various K-12 Schools, related items 20. EXAMPLE PROJECT KEY NUMBER 2 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) ongomg ongoing 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT Miami Dade Public Schools Ms. Nancy Tobin 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Miami Dade Public School District is one of the many School Districts which we have a Qualification Based Contract for Geotechnical Engineering, Construction Materials Testing and Structural (Special! Threshold) Inspections and Environmental Services. We have held this contract since 2000, mere months after opening our Miami office/ lab location. This award was especially gratifYing since it was our first time presenting to that School District. Since 2000, we have maintained a presence on at least 2 sites at any given time. CURRENT ACTIVE PROJECTS: * New Prototype High School YYY - -300,000 SF (J, 700 student stations) of new construction inc. administration, media center, electives and academic wings, food service, chiller building, PE shelter, teachers, parent and student parking, associated athletic courts and fields. Services include geotechnical engineering, monitoring services, materials testing and special! threshold inspections. * South Miami Middle School-project includes the installation of an 8" diameter PVC by approximately 600 foot long sanitary sewer line. Services include geotechnical engineering, monitoring services, materials testing and special inspections. c. POINT OF CONTACT TELEPHONE NUMBER 305-995-2423 * New Prototype High School HHH- -200,000 SF (2000 student stations) of new construction inc. administration, media center, academic wings, food service, stage and gymnasium, chiller building, PE shelter, teacher, parent and student parking, associated athletic courts and fields. Services include a Phase I and II environmental assessment, geotechnical engineering, monitoring services, materials testing and special! threshold inspections. * Miami Northwestern High School- construction of t\\'o cooling towers. Services include construction materials testing. ADDITIONAL: * Coral Gables Senior High School * Pine Villa Elementary School * Caribbean Elementary School * Florida City Elementary School * Cutler Ridge Elementary School * Bel-Aire Elementary School Our experience inc. classroom buildings, libraries, athletic buildings, affiliated fields, bill boards, concessions stands, parking & driving areas, associated land purchases, etc. Our overall experience in various Districts has made us comfortable with the guidlelines, expectations, challenges we could encounter & how to approach them. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Nutting Engineers of Florida, Inc. Miami Dade, Florida Geotechnical Engineering Firm- full scope of services (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE F-2 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 3 Como/ete one Section F for each oroject.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Joseph Caleb Center New Courthouse and Parking Garage, Miami PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 ongoing 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER I b. POINT OF CONTACT I c. POINT OF CONTACT TELEPHONE NUMBER Miami Dade GSA (Gen Serv Admin) Mr. Alex Rodriguez, RA 305-375-5965 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Perfonned preliminary geotechnical investigation in 2003 (c/o F.R. Aleman) when the design involved a proposed 8-9 story building. Nutting perfTomed an addtional geotechnical investigation in 2009, requested by Bennello Ajamil and Partners, as well as a Phase I and 1\ Environmental Assessments on the property. Portions of the site were filled with various types of debris to depths of approximately 12 feet causing large depressions in the pavement areas. We worked with the client and the structural engineer to provide the best economical solutions for foundation support. Currently plans include the phased construction of a four level parking garage and a separate 2-story courthouse annex building on the approximate 1.44 acre site. Project still in pre-construction phase. Nutting anticipates the construction material testing and threshold inspections for this project. 25. FIRMS FROM SECTION C INVOLVED WITH nTls PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm- full scope of services (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE F-3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects. if not specified. Com Jete one Section F for each ro 'ect. 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) FlU Football Stadium and Student Support Complex Miami. Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007 2009 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CO NT ACT Florida International University Mr. Danny Paan 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT c. POINT OF CONTACT TELEPHONE NUMBER 305-348-4405 This project includes the construction of the new FootbalJ Stadium with a final seating capacity of 45,000 people as welJ as the new Student Support Complex to include locker rooms, bathrooms and weight training areas. The first phase of construction began with the dismantling of the south stands bringing seating capacity to 18,000 people featuring 1400 club seats, a 6500 SF Panther Club, an upper concourse and 19 suites. The Current phase includes the student support complex bringing the stadium capacity to 45,000 people. Nutting involvement included the visual inspection of earthwork and site preparation and lead into the construction materials testing of soil and concrete. We also are performing the inspections including that of the drilled shafts for the light poles and perfonnance oflight weight pull tests on the roof. Architect: Rossetti Architects General Constractor: Odebrecht Construction $50,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Nutting Engineers of Florida.. Inc. Miami, Florida Prime (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE F-4 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 5 Como/ete one Section F for each oroiect.) . 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Miami Children's Hospital, Miami PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 ongoing 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER I b. POINT OF CO NT ACT I c. POINT OF CONTACT TELEPHONE NUMBER Miami Childrens Hospital Mr. Robert Nowland, VP 305-668-5519 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Parking Garage: Proposed construction is to be a Additional projects for the Hospital include a central 4-story parking garage of approximately 240,000 energy plant expansion in 2007 (3-story, 46,380 SF gross square feet. The structure is to be supported including office space, generator room storage, on 18 inch diameter; 200 ton auger cast piles and is installation of a 20,000 gallon underground storage to be constructed of precast concrete components. tank), the West Kendall Generator Pad in 2009, the The first level is to be slab-on-grade construction. Dan Marino 2nd Floor Expansion in 2005. Geotechnical engineering/exploration, pile load test monitoring, pile installation monitoring, construction materials testing, threshold inspection services. Construction recently underway. Bed Tower: six-story tower with a 48,000 SF footprint. To date, Nutting has performed the Additional contact: geotechnical investigation (April 2010). Ms. Karen Weichold Anticipated: pile load test monitoring, pile installation Arellano Construction Company monitoring, construction materials testing, threshold Phone: (305) 994.9901 x109 inspection services. Cell: (786) 282.1537 Mr. Ronald Ference Miami Childrens Hospital Phone: (786) 624.2475 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Finn- Full scope of services (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE F-5 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER (Present as many projects as requested by the agency, or 1 0 ~)ojects, if not specified. 6 ComD/ete one Section F for each Droiect. 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Sunny Isles Beach Fire Station #10 PROFESSIONAL SERVICES CONSTRUCTION (II applicable) 175th to 172nd Street, Sunny Isles 2007 2008 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER I b. POINT OF CONTACT I c. POINT OF CO NT ACT TELEPHONE NUMBER Miami Dade County- Fire Rescue Ms. Margarita Garces 786-331-4518 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT The project consisted of a temporary fire station for two to three years. It included two, 24 by 60 foot trailers as well as a structural slab with a 50 foot by 20 foot by 16 foot high canopy for fire rescue parking. 1775 N. Bay Road Performed geotechnical engineering and exploration services, general site preparation and foundation design recommendations, construction materials testing including soil density tests, modified proctor density tests, Limerock Bearing Ratio, various laboratory analysis, concrete compressive strength testing. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering fim1 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE 1. STANDARD FORM 330 (6/2004) PAGE F-6 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER (Present as many projects as requested by the agency, or 10 ~}ojects. if not specified. 7 Como/ete one Section F for each oroiect. 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Sunny Isles Beach Gymnasium- 2 acre parcel, 181 st Drive and North PROFESSIONAL SERVICES CONSTRUCTION (II applicable) Bay Road 2007 2007 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER I b. POINT OF CONTACT I c. POINT OF CO NT ACT TELEPHONE NUMBER City of Sunny Isles Ms. Susan Simpson 305-792-1706 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Construction included a 2-story recreation center building with a footprint of 6,000 SF and a gymnasium with a footprint of 8,000 SF. The buildings are supported on piles for which Nutting provided the pile load testing and pile installation monitoring which inckuded 200+ augercast piles. The buildings are constructed of engineered unit masonry with precast concrete joists and cast-in-place concrete slab at the second level of recreation center and steel trusses at the roof of the gymnasium. Special inspections were also be performed for the pre-cast and poured-in-place concrete and the structural steel in accordance with the specifications. Threshold inspections were performed in accordance with the structural inspection plan. Nutting Engineers also performed the geotechnical engineering & exploration services, general site preparation and foundation design recommendations on behalf of Calvin Giordano and Associates in 2004. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Nutting Engineers of Florida, Miami, Florida Geotechnical Engineering Firm- full Inc. scope of services (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and Slate) (3) ROLE e. (1l FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE F-7 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER (Present as many projects as requested by the agency, or 1 0 ~~jects, if not specified. 8 Comolete one Section F for each oroiect. 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Memorial Regional Hospital Miramar Expansion-various buildings PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Hollywood, Florida 2005 ongoing 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER I b. POINT OF CONTACT 1 c. POINT OF CONTACT TELEPHONE NUMBER Memorial Healthcare Systems Mr. Roger Pitts 954-433-7184 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Nutting has performed testing on numerous buildings, Memorial Hospital West - Timeline: 2009 parking garages, central energy plants, etc. for their main Cancer Institute Cyberknife expansion hospital as well as various off campus locations. The 5-story patient tower testing services provided include geotechnical central energy plant engineering/exploration, pile load testing, pile installation monitoring, jet grouting underpin monitoring, construction Memorial Hospital West - Timeline: 2007 materials testing, threshold & special inspection services, Pediatric ER expansion phase I and phase II environmental property 9-story Master Plan Phase II ER/OR expansion assessments,vibroflotation monitoring, and chemical grouting on numerous buildings throughout the hospitals Memorial Hospital West - Timeline: 2006 expansion. Nutting's has an established relationship with Roadway evaluation Memorial Regional Hospital. Our Chief engineer has been providing testing services for Memorial Hosptial for appoximately 25 years. PROJECTS INCLUDE: Memorial Hospital Miramar - Timeline: 2005 Joe DiMaggio Children's Hospital - Timeline: Ongoing 7-story hospital 6-story hospital building 5-story medical office building 4-story parking garage Memorial Hospital Pembroke - Timeline: 2005 central energy plant pedestrian bridge connecting NICU and JD Hospital Urgent Care Facility 2, 2-story medical office buildings Memorial Regional Hospital - Timeline: 2009 Memorial Hospital West - Timeline: 2003 Phase II Neonatal Intensive Care Unit parking garage and central energy plant Construction of new hospital and medical office building. All phases of buildings, parking structures and drainage improvements. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Nutting Engineers of Florid~ Inc. Miami, Florida Geotechnical Engineering Fim1- full scope of services (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE F-8 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER (Present as many projects as requested by the agency, or 10 ~)ojects, if not specified. 9 Como/ete one Section F for each oroiect. 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Cudjoe Key Waste Water Transmission Main PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Florida Keys, Florida 2008 2008 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER lb. POINT OF CONTACT 1 c. POINT OF CONTACT TELEPHONE NUMBER FKAA/ CH2M Hill Mr. Andrew Smyth 305-294-1645 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Project included the construction of a regional waste water transmission system consisting of 87,000 lineal feet of transmission main pipeline from each primary lift station to the boundary of the waste water treatment plant. This included ten bridge crossings and eight master lift stations, each with permanent standby power and permanent odor control facilities. Nutting performed geotechnical engineering and exploration services - standard penetration test borings plus drilling on hydraulic spud barge, SFWMD exfiltration tests, soil classification and laboratory analysis, sieve analysis. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Nutting Engineers of Florida Inc. Miami, Florida Geotechnical Engineering Fim1 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE F-9 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 p:ojects, if not specified. Como/ete one Section F for each oroiect.] 21. TITLE AND LOCATION (City and State) South Point ROW, Phases III, IV & V Right of Way Infrastructure Improvements Miami Beach, Florida 20. EXAMPLE PROJECT KEY NUMBER 10 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 11/2006 11/2006 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Chen and Associates b. POINT OF CO NT ACT Mr. Oscar Bello, PE c. POINT OF CONTACT TELEPHONE NUMBER 786-497-1500 x-104 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Improvements included the installation of underground utilities (water main and stormwater drainage) within the public right-of-way (ROW)as well as the reconstruction (improvement) to the affected roadways. The project entailed approximately 19,000 If of roadway. Nutting was also involved for another client (Calvin Giordano and Associates) in the Miami Beach Right-of-Way Infrastructure Improvements, which included the replacement of -40,000 If of 8-12 inch diameter water mains, re-milling of roadways, the installation of street scapes including the curbing, islands, lighting and parallel parking. Nutting's services included the performance of geotechnical engineering services and construction materials testing that included nuclear density tests and apshalt cores as wellas various laboratory testing for the South Point Right of Way Infrastructure inprovements - Phases III, IV and V for the City of Miami Beach. Nutting worked as a subconsultant for Chen and Associates, but also holds a geotechnical engineering and materials testing contract with the City of Miami Beach. Nutting's fees $25,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Nutting Engineers of Florida, Miami, Florida Geotechnical Engineers and Testing Inc. Firm (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE F-10 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 28. EXAMPLE PROJECTS LISTED IN SECTION F 26. NAMES OF KEY PERSONNEL 27. ROLE IN THIS CONTRACT (Fill in "Example Projects Key" section below before completing table. (From Section E, Block 12) (From Section E, Block 13) Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Paul Catledge, PE Sm. Proj. Engl Main POC ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ Richard C. Wohlfarth, PE Principal! Dir. Of Eng ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ Pavel Cruz Field Operations Manager ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ Jan Beernink Environmental Project Mgr. ./ ./ ./ 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Miami Dade County- Multiple Departments 6 Sunny Isles Fire Station # I 0 2 Miami Dade Public Schools- Multiple 7 Sunny Isles Beach Gymnasium 3 J. Caleb Courthouse & Parking Garage 8 Memorial Regional Hospital Expansion 4 FlU Football Stadium, Student Support Complex 9 Cudjoe Key Waste Water Transmission Line 5 Miami Childrens Hospital 10 South Point ROW Infrastructure Improvements STANDARD FORM 330 (612004) PAGE G-1 1. SOLICITATION NUMBER (If any) ARCHITECT-ENGINEER QUALIFICATIONS 10-04-0 I PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER Nutting Engineers of Florida., Inc. 1967 065663668 2b. STREET 5. OWNERSHIP 2051 NW 112th A venue, Suite] 26 a. TYPE 2c. CITY 12d. STATE !2e. ZIP Corporation Miami FL 33172 b. SMALL BUSINESS STATUS 6a. POINT OF CO NT ACT NAME AND TITLE Mr. Paul Catledge, P.E. Senior Project Manager; Division 7. NAME OF FIRM(1f block 2a is a branch office) 6b. TELEPHONE NUMBER I 6c. E-MAIL ADDRESS 305-824-0060 paulc@nef.cc 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER 1932, HC Nutting 1956, Nutting Engineers, Inc. 1932, 1957 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function c. No. of Employees a. Profile c. Revenue Index Code b. Discipline Code b. Experience Number (1) FIRM (2) BRANCH (see below) 27 F ou ndation/Geotech n ical 4 2 S05 Soils & Geoloaic Studies' 6 48 Proiect Manaaer 2 2 T02 Testina & Insoection Services 7 16 Construction Manaqer 2 I E09 EnvironmentallmDact Studies 5 24 Environmental Scientist 4 EI2 Environmental Remediation 5 EI3 EnvirOnmental Testina and 4 08 CADD Technician 2 AIO Asbestos Abatement I 58 T echnician/Analvst 25 6 02 Administrative 8 3 53 Scheduler 2 I Other Employees Total 51 14 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM 1. Less than $100,000 6. $2 million to less than $5 million FOR LAST 3 YEARS (Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million a. Federal Work I 4. $500,000 to less than $1 million 9. $25 million to less than $50 million b. Non-Federal Work 7 5. $1 million to less than $2 million 10. $50 million or greater c. Total Work 7 12, AUTHORIZED REPRESENTATIVE - The foregoing is a statement of facts. a. SIGNAT~ ~ /.. #; / /J./ R.:-:r7 I b. DATE May 26. 2010 c. NAME AND tiTLE / Richard C. Wohlfarth, P.E. STANDARD FORM 330 (612004) PAGE II SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1. Thisswom statement is submitted to The City of Sunny Isles Beach ~ Richard C. Wohlfarth, P.E. fur Nutting Engineers of Florida, Inc. whosebusinessaddressis 2051 NW 112th Avenue, Suite #126, Miami, FL 33172 and (if applicable) its Federal Employer Identification Number (FEIN) is 59 -1159182 (IF the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: 2. I understand that a "public entity crime" as defined in Paragraph 287.1 33(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287 .133(1)(b), Florida Statutes means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July I, 1989, as a result of a jury verdict, nonjury trial, or entry of a plea of guilty or nolo contenders. 4. I understand that an "affiliate" as defined in Paragraph 287. 1 33(1)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity come. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.1 33(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 6. Based on information and belief, the statement which I have marked below is true in a relation to the entity submitting this sworn statement. (Please indicate which one (1) of the following three (3) statements is applicable.) ~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(2) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affi I iate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(3) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or agents who are active in management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. However, there has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attached is a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH I (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. I~~~ Richard C. Wohlfarth, P.E. SIGNATURE OF AFFI (Printed or Typed Legal Name of Affiant) State of FloridaCountyof Palm Beach Sworn to and subscribed before me this 26 thday of Ma y 1J~~;:;E~lj~ ::/ ( '../; qOlT!mission DO 648115 Notary Seal: Notary's Name';~r.16tfcI; tM1~oo~9 Personally Known: ~. or Produced Identification ,2010 by Identification Produced NON-COLLUSIVE AFFIDA VIT State of Flori<}la County of Palm Beaph Richard C. Wohlfarth, P.E. and says that: being first duly sworn, deposes (I) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has submitted the attached Bid; (2) He/she is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; (3) Such Bid is genuine and is not a collusive or sham Bid; (4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, finn, or person to submit a collusive or sham Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through any coJlusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work; (5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or parties in interest, including this Affiant. Richard C. Wohlfarth, P.E. SIGNATURE OF AFFIA (Printed or Typed Legal Name of Affiant) State of Florida County of Palm Beach Sworn to and subscribed before me this 26th day of ~~BQ,~ .,} '.y' Commission DO 648115 ;'~F~ Expires June 11, 2011 S- x;~. Bonded Thru Troy Fain Insurance 800-385-7019 Notary's Name Printed, Stamped or Typed Personally Known: ~ or Produced Identification May ,2010by Notary Seal: Identification Produced FINANCIAL DOCUMENTS The following Income Balance Sheets are to remain CONFIDENTIAL and not to be made PUBLIC RECORD. Please destroy these documents once they are reviewed and do not include them as part of our submittal package. Thank You} Richard G. lossi} P.E. President NUTTING ENGINEERS OF FLORIDA} INC. Huning Engineers of Florida Inc.1 Established 1967 Your Project is Our Commitment Page: 1 NUTTING ENGINEERS OF FLORIDA, INC. Income Statement For the Three Months Ending March 31, 2010 Current Month Year to Date Revenues Income-Eng. Dept. 24,335.00 8.58 50,686.25 7.13 Income-Engr. Dept/PSL 660.00 0.23 8,749.00 1.23 Income-Engr Dept/Miami 23,976.74 8.45 62,724.72 8.82 Income-Eng. Field Svcs. 33,368.50 11.76 61,041.00 8.58 Income-Field Svcs-PSL 0.00 0.00 7,886.25 1.11 Income-Eng. Field Svcs/Miami 41,569.50 14.65 73,697.00 10.36 Income-CMT Dept. 42,962.20 15.14 135,209.50 19.01 Income-CMT Dept-PSL 4,205.50 1.48 14,777.50 2.08 Income-CMT Dept/Miami 64,693.62 22.80 174,252.49 24.51 Income-Insp. Dept. 23,228.75 8.19 49,299.00 6.93 Income-Insp. Dept.-PSL 2,575.00 0.91 11,947.00 1.68 Income-Insp. Dept-Miami 19,217.51 6.77 55,490.89 7.80 Other Income 2,958.25 1.04 5,323.25 0.75 Total Revenues 283,750.57 100.00 711,083.85 100.00 Expenses Discounts Given 442.75 0.16 1,692.75 0.24 Discounts Given-Miami 1,434.80 0.51 1,434.80 0.20 Wages-Default 128.00 0.05 128.00 0.02 Salaries-Engineering Dept. 4,846.56 1.71 13,486.08 1.90 Salaries-Engr. Dept-Miami 4,896.24 1.73 13,624.32 1.92 Salaries-Engr Field Svc. 11,739.76 4.14 34,922.81 4.91 Salaries-CMT Dept. 22,527.67 7.94 68,064.20 9.57 Salaries-CMT Dept-Miami 16,642.71 5.87 46,882.78 6.59 Salaries-Insp. Dept. 3,901.96 1.38 16,054.22 2.26 Salaries-Insp Dept. - PSL 3,627.68 1.28 10,479.39 1.47 Salaries-Insp. Dept.- Miami 2,130.00 0.75 6,830.00 0.96 Auto & Truck-Eng. Dept. 1,850.43 0.65 5,063.53 0.71 Auto & Truck-Eng. Dept./Miami 239.28 0.08 855.54 0.12 Auto & Truck-Eng. Field Svc. 1,581.88 0.56 4,119.07 0.58 Auto & Truck-CMT Dept. 3,989.00 1.41 10,977.34 1.54 Auto & Truck-CMT Dept-Miami 1,843.79 0.65 5,622.24 0.79 Auto & Truck-Inspect. Dept. 1,444.46 0.51 4,028.35 0.57 Auto& Truck-Insp Dept-PSL 613.89 0.22 1,544.68 0.22 Auto & Truck-Insp Dept-Miami 280.13 0.10 822.68 0.12 Services-Eng. Dept. 567.57 0.20 904.59 0.13 Services-Eng. Dept-Miami 0.00 0.00 56.95 0.01 Services-Eng. Field Servo 51.65 0.02 3,899.93 0.55 Services-Engr Field Svc-Miami 0.00 0.00 425.00 0.06 Services-CMT Dept. 3,992.93 1.41 5,071.11 0.71 Services-CMT Dept-PSL 0.00 0.00 550.00 0.08 Services-CMT Dept-Miami 0.00 0.00 4,470.00 0.63 Services-I nspection Dept. 36.79 0.01 111.08 0.02 Field Supplies-Eng Dept-Miami 0.00 0.00 13.24 0.00 Field Supplies-Eng. Field Serv 481.46 0.17 4,988.69 0.70 Field Sup-Engr Field Svc-Miami 0.00 0.00 143.56 0.02 Field Supplies-CMTDept. 1,897.10 0.67 3,524.75 0.50 Field Supplies-CMT - Miami 25.42 0.01 56.44 0.01 Repair & Maint.-Eng. Dept. 48.92 0.02 1,149.22 0.16 Repair & Maint-Eng Field Servo 128.17 0.05 5,551.31 0.78 Repair & Maint-CMT Dept. 335.88 0.12 1,570.45 0.22 Repair & Maint-CMT Dept./Miami 34.71 0.01 34.71 0.00 Repair & Maint-Inspect. Dept. 75.27 0.03 154.67 0.02 Equip. Rental-Eng. Dept. 2,420.14 0.85 6,840.42 0.96 Equip Rental-Eng Dept - Miami 795.63 0.28 2,386.89 0.34 Equip. Rental-Eng. Field Servo 1,381.52 0.49 4,997.02 0.70 Equip Rental-Eng Field Svc-Mia 56.23 0.02 416.23 0.06 For Management Purposes Only Equip. Rental-CMT Dept. Equip Rental-CMT Dept-Mia Equip. Rental-Insp. Dept. Equipment Rental-Insp Dept-Mia Travel Expense- Eng Dept-Mia Travel Expense-Eng. Field Ser. Travel Expense-Eng Fld Svc-Mia Insurance-Eng. Dept. Insurance-Eng. Field Servo Insurance-CMT Dept. Insurance-Inspection Dept. Engineering Svcs-Eng. Dept. Safety Exp-Eng Field Servo Safety Exp-CMT Dept. Health/Dentallns-Eng. Dept. Health/Dentallns-Eng Dept-Mia Health/Dentallns-Eng Fd Svc Health/Dentallns-CMT Dept. Health/Dentallns.-CMT Miami Health/Dentallns. Inspec Dept Health/Dentallns-Insp-PSL Auto - Safety Advertising and Gifts Audit and Legal Contributions Dues & Subscriptions Professional Development Insurance Interest Interest - Port St Lucie Late Fees Late Fees - PSL Late Fees - Miami Health/Dentallns Expense Health/Dentallns. Exp. - PSL Health/Dentallns. Expense-Mia Office Supplies Office Supplies - PSL Office Supplies - Miami Postage Postage-Miami Office Equipment Lease Office Equipment Lease/PSL Office Equipment Lease - Miami Rent Rent-Miami Worker's Compensation Exp Salaries-Clerical Salaries Clerical - Miami Overtime-Clerical Overtime-Clerical Miami Salaries-Officers Salaries-Computer Dept. Payroll Taxes Taxes & Licenses Taxes & Licenses-PSL Telephone Telephone-PSL Telephone-Miami Utilities NUTTING ENGINEERS OF FLORIDA, INC. Income Statement For the Three Months Ending March 31, 2010 Current Month 49.20 0.02 819.94 0.29 (8.03) 0.00 305.94 0.11 0.00 0.00 0.00 0.00 0.00 0.00 2,959.96 1.04 4,771.75 1.68 5,642.18 1.99 2,507.28 0.88 1,054.70 0.37 0.00 0.00 0.00 0.00 1,906.72 0.67 690.16 0.24 3,651.81 1.29 6,075.93 2.14 1,526.07 0.54 1,089.12 0.38 (31.25) (0.01) 68.25 0.02 0.00 0.00 800.00 0.28 0.00 0.00 596.25 0.21 950.00 0.33 (1,206.88) (0.43) 4,696.70 1.66 2,829.42 1.00 1,138.70 0.40 132.48 0.05 18.37 0.01 5,430.71 1.91 119.34 0.04 1,680.62 0.59 907.87 0.32 264.02 0.09 743.93 0.26 1,000.00 0.35 4.90 0.00 3,005.27 1.06 226.21 0.08 345.73 0.12 6,987.91 2.46 4,000.00 1.41 696.22 0.25 8,151.38 2.87 2,596.00 0.91 0.00 0.00 126.00 0.04 5,477.68 1.93 5,970.80 2.10 8,889.17 3.13 0.00 0.00 0.00 0.00 2,519.15 0.89 510.90 0.18 748.66 0.26 (1,166.61) (0.41) For Management Purposes Only Year to Date 514.78 2,459.82 1,473.25 917.82 200.00 2,254.65 1,190.00 12,301.76 18,364.75 21,615.82 10,271.29 1,054.70 67.95 167.96 3,762.58 1,074.78 6,044.17 10,858.49 2,992.53 2,280.17 (93.75) 395.56 1,241.67 2,455.00 100.00 1,591.25 950.00 (42.92) 13,838.39 7,355.61 4,162.93 526.18 59.22 9,990.64 249.00 1,059.06 (162.53) 264.02 1,011.63 2,000.00 204.90 9,616.48 452.42 345.73 20,963.73 12,000.00 72.83 23,317.52 7,844.00 102.00 156.00 15,242.24 16,614.40 33,725.81 5,019.80 5,262.60 7,570.94 1,587.27 2,270.09 1,774.49 Page: 2 0.07 0.35 0.21 0.13 0.03 0.32 0.17 1.73 2.58 3.04 1.44 0.15 0.01 0.02 0.53 0.15 0.85 1.53 0.42 0.32 (0.01) 0.06 0.17 0.35 0.01 0.22 0.13 (0.01 ) 1.95 1.03 0.59 0.07 0.01 1.40 0.04 0.15 (0.02) 0.04 0.14 0.28 0.03 1.35 0.06 0.05 2.95 1.69 0.01 3.28 1.10 0.01 0.02 2.14 2.34 4.74 0.71 0.74 1.06 0.22 0.32 0.25 Page: 3 NUTTING ENGINEERS OF FLORIDA, INC. I ncome Statement For the Three Months Ending March 31, 2010 Current Month Year to Date Utilities-PSL 110.56 0.04 374.78 0.05 Utilities-Miami 234.88 0.08 585.69 0.08 Depreciation 3,207.48 1.13 17,557.46 2.47 Bad Debts 0.00 0.00 (118,038.00) (16.60) Salaries-Business Develop. 9,465.18 3.34 27,356.49 3.85 Salaries-Business Dev-PSL 3,115.20 1.10 9,501.36 1.34 Auto - Business Development 201.17 0.07 482.81 0.07 Auto-Business Dev-PSL 400.00 0.14 1,200.00 0.17 Conference - Business Dev. 100.00 0.04 413.67 0.06 Conference-Business Dev/PSL 0.00 0.00 25.25 0.00 Market Materials - Bus. Dev. 0.00 0.00 284.12 0.04 Cell Phone Expense 1,669.74 0.59 5,911.21 0.83 Cell Phone Expense-PSL 196.89 0.07 619.58 0.09 Cell Phone Expense/Miami 634.43 0.22 2,008.16 0.28 Computer Supplies and Repair 790.87 0.28 1,589.57 0.22 In House Expenses 7.62 0.00 253.12 0.04 In House Expenses/PSL 143.78 0.05 287.56 0.04 In House Expense/Miami 301.91 0.11 1,125.74 0.16 Overhead Maintenance 721.01 0.25 2,360.36 0.33 Overhead Maint.-PSL 0.00 0.00 278.00 0.04 Association Fees -PSL 0.00 0.00 1,219.24 0.17 Bank Charges 264.58 0.09 1,023.14 0.14 Salaries-Indirect 2,787.60 0.98 7,756.80 1.09 Management Expense 3,000.00 1.06 9,000.00 1.27 Total Expenses 226,113.91 79.69 578,086.63 81.30 Net Income $ 57,636.66 20.31 $ 132,997.22 18.70 For Management Purposes Only