Loading...
HomeMy WebLinkAboutBHA #4 Of SUt/. REQUEST FOR QUALIFICATIONS NO. 10-04-01 PROFESSIONAL ENGINEERING SERVICES CITY OF SUNNY ISLES BEACH MIAMI-DADE COUNTY, FLORIDA MA" ~ ~ 70th I "W~'(~ftt' Presented By' CITY OF SUNN~ Isu~;:, ,: . OFFICE OF THF rftr {:L:: B HA Beiswenger, Hoch and Associates, Inc. May 26,2010 BHA Beiswenger, Hoch and Associates, Inc. Beiswenger, Hoch and Associates, Inc. (BHA) is pleased to submit this Qualification Submittal for providing professional engineering services. We are experienced and interested in the following engineering related work categories: Categories Requested . Survey . Structural . Environmental (permitting) . Traffic . Construction management . Construction inspection . Hurricane recovery and debris monitoring services . General design work . Preparation of complete construction contract plans and special provisions for the assigned project . Post design services (shop drawing review and responses to Request for Information) . Bid Administration (selection and letting) 1. Name, address, company and persons having financial interest in firm Beiswenger, Hoch & Associates, Inc. (BHA) headquarters address is: Beiswenger, Hoch & Associates Inc. 510 Shotgun Road, Suite 400 Sunrise, FL 33326 Beiswenger, Hoch & Associates, Inc. (BHA) was incorporated in 1955 in the State of Florida. During its 55 years of operating as a professional engineering and architect firm, BHA has always operated on a sound financial basis. BHA's annual revenue for the past two years was $6,909,639 (2009) and $5,707,678 (2008). Persons having a financial interest in Beiswenger, Hoch & Associates include: . Francisco A. Norona President 2255 Antilia Avenue Davie, FL 33324 . Gabriel F. Norona Pri ncipa I-I n-Cha rge 1190 NW 8th Street Plantation, FL 33325 . Maria G. Alvarino Secreta ry 7774 NW 168th Terrace Miami Lakes, FL 33016 1 3. Proof of authorization to transact business in Florida from the Florida Secretary of State State of Florida Department of State I certify from the records of this office that BEISWENGER, HOCH & ASSOCIATES, INC. is a corporation organized under the laws of the State of Florida. filed on June 29, 1955, The document number of this corporation is 186178. I further certify that said corporation has paid all fees due this office through Decem ber 31, 20 10, that its most recent annual report was filed on January II, 20 I 0, and its status is active, I further certify that said corporation has not filed Articles of Dissolution. (;;vm under my hand and the Great "'irQI 01 Florida, at Talloluust'l!, th~ Capital, thi~ ,1" T.,.nl},71~ Secretary of State Authc-ntiMu\'lll fI) ~16~7411J5.-411310.18617H Io luLh:nu..:ale ws cnt1ficute.vi5it Lhc: foUo","~ sltc, ('TUJ W! ID,andthtnfollowtht1lUtl'Ul:uonscsplllYfd brtps:/Itmt.sunblz,ol'glctrtluthn'r.btmJ 2. Relevant Project Experience BHA has experience in performing services on a work assignment/ task order contract. The assignments have covered roadway and bridge design, architectural and engineering services, structures design, construction engineering and inspection, constructability review services, survey, and hurricane recovery and debris monitoring services. We have performed these work assignment/task order contracts for the following agencies: . Miami-Dade County Public Works Department miscellaneous roadway design projects miscellaneous bridge design services miscellaneous survey services . Federal Highway Administration highway and bridge engineering . Broward County architectural! engineering services . Town of Davie structural engineering 2 City of Sunny Isles Beach Experience: Since 2001, BHA has performed professional engineering services on several projects/ assignments done specifically for the City of Sunny Isles Beach (reference: Rick Conner, City Manager, (305) 792-1928 and Jorge Vera, Assistant City Manager, (786) 202-1157). The projects include: 1. City of Sunny Isles Beach Miscellaneous Consultant Services AGreement (2001) A. Administration and assistance with regard to the Local Area Program (LAP) B. Assistance with the appropriations application from the State of Florida, for $500,000 towards the Golden Shores Stormwater Project C. Assistance and administration in meeting the requirements of the "NPDES" Program D. Other various items requiring engineering consultation 2. City of Sunny Isles Beach PhotGrammetric and MapppinG Consultant AGreement (2001) 3. City of Sunny Isles Beach Golden Shores DrainaGe System and Street Improvements Consultant AGreement (2001) A. Evaluation of Drainage Problems and Street Improvements B. Topographical survey, final street and drainage design, pavement improvements, pavement markings and signalization C. Contract documents, specifications, technical assistance during bidding and miscellaneous engineering services 4. City of Sunny Isles Beach Golden Shores DrainaGe System Technical Assistance Consultant AGreement (2001) 5. City of Sunny Isles Beach Golden Shores DrainaGe System Proiect OversiGht (Construction Inspection) Consultant AGreement (2002) 6. City of Sunny Isles Beach ConsultinG AGreement for 2002 NPDES Permit Application (2003) 7. City of Sunny Isles Beach Consultant AGreement (2003) A. Value Engineering for Senator Gwen Margolis Park Drainage Improvement 8. City of Sunny Isles Beach ConsultinG AGreement (2004) A. Photogrammetric and Mapping Services 9. City of Sunny Isles Beach Consultant AGreement Contract No. 04-03628-01 Central island DrainaGe and Street Improvement Proiect (2003-2010) A. Central Island Stormwater Drainage including design, technical assistance and bidding process B. Bicycle Path design and implementation C. Design required to incorporate undergrounding utilities information D. Design required to have curbs and gutters on all of the streets E. Construction Engineering & Inspection and project management F. Additional pre-construction, design and CEI services for increased parking, street lighting, landscaping and additional improvements to Gwen Margolis Park including: 3 a. Bidding assistance and technical services in support of legal challenge to bid process b. CEI services on NE 183rd Street c. Technical services for pre-construction and CEI services for initial construction on Central Island drainage d. CEI services on Central island drainage including landscaping, lighting and Gwen Margolis park e. Design services for Central island lighting, landscaping, park and drainage improvements f. FPL easements for converting the existing overhead electrical service to underground on Church Drive on NE 178th Drive g. Municipal Parking lot on NE 175th Terrace: adding several drainage structures and pipe h. Foundation slab design at restroom building in Gwen Margolis Park i. Design and permitting for water distribution/sewer collection plan for restroom building and Gwen Margolis Park j. Underground electrical conversion design (performed by subconsultant) k. Additional Outfall Improvements @ NE 183rd Street and North Bay Road 10. (BHA as subconsultant) North Bay Road Pedestrian Bridae and Observation Deck (2007-2010) A. Bridge design 11. (BHA as subconsultant) New Port Fishina Pier Replacement (2008-2010) A. Pier/bridge design B. Architectural! structural design for restaurant 12. City of Sunny Isles Beach 183rd St. Streetscape Improvements (2009-1010) A. Construction engineering * inspection (CEI) B. EEO reporting C. ARRA auditing a. Reference Project Name/Address: City of Sunny Isles Beach, Florida Reference Project Description: Scope of Services Provided: Central Island Drainage and Street Improvements Value engineering of existing drainage design, evaluation of drainage alternative, preliminary design final pavement rehabilitation and drainage design using deep wells and technical assistance during bidding process. Beiswenger, Hoch and Associates was invited to evaluate a previously design stormwater drainage system. BHA evaluated that system and upon an environmental, feasibility and cost evaluation, recommended for a new design using a series of drainage wells interconnected for flow equalization. The system recommended by BHA eliminated direct outfalls to the ecological sensitive Dumbfoundling Bay. ,J 4 This drainage and street improvement project is part of the Comprehensive Plan to alleviate flooding problems throughout the City of Sunny Isles Beach. BHA's approach to solve the flooding problems of the Central Island neighborhood was to utilize Drainage wells. This drainage and street improvement project is the first of its kind to utilize 22 Stormwater Drainage Wells for flood control. The injection wells are modeled to equalize runoff injection to the water table. b. Reference Project Name/Address: City of Sunny Isles Beach, Florida Reference Project Description: Scope of Services Provided: Golden Shores drainage and street improvements Survey, street widening and revised preliminary and final design and construction inspection. Project Start Date: Nov. 2000 Project Completion Date: Mar. 2003 Construction Completion Date: Jan. 15, 2003 $ 3,449,896.56 Professional Fees: $ 448,864.00 Construction Start Date: 3/2002 Project Construction Cost: The City of Sunny Isles Beach was experiencing drainage problems with the recently completed storm drainage pumping system built in the Golden Shores neighborhood. The objective of this project was to identify and quantify alternative methods to remedy the current problems: Drainage evaluation, final design and technical construction assistance to the City were included in this project: The project encompassed four phases of development. BHA provided consulting engineering services for all phases listed below: Phase I: Flood control study and evaluation of the existing storm sewer system and pumping station. Completed on January 2001. Phase II: Photogrammetric and planimetric mapping of this 80 acre site, pavement condition survey, plan production for the reconstruction of the storm sewer system, street widening and signalization. This phase also included the electro-mechanical refurbishment of the pumping station and new flood control staging. Storm sewer rehabilitation using epoxy resins and polyester liner was utilized. The 9,100 linear feet of storm sewer "cured in place piping" (CIPP) rehabilitation process is considered the largest of its kind in the US and was published on the July 2002 issue of the "Trenchless Technology " magazine. Drainage problem in one section of this neighborhood was accomplished by using four (4) Storm Drainage Wells. Phase III: Technical assistance to the City of Sunny Isles Beach for letting and bidding process for the implementation of this 3.5 million construction cost project. Completed on October 2001. Phase IV: Consulting engineering services for the construction supervision (CEI) for the construction of this project. Completed on January 2003. 5 4. See SF330 Form S. Name, title, qualifications, experience and contact information of proposed contact person Robert Deuser, Vice President Mr. Deuser joined BHA in 1976 and presently directs programs in the area of transportation planning, master plan studies, PD&E studies and roadway/ bridge design projects. Mr. Deuser served as Project Manager for the Master Plan Study for SR 836 (East-West Expressway) in Dade County. This facility is approximately 12 miles in length. The study includes mainline improvements, interchange improvements, HOV treatments a direct connector between the expressway and Miami International Airport and the possible use as a mass transit corridor. Mr. Deuser also served as Project Manager on the Golden Glades interchange Master Plan and PD&E Study in Dade County. This project involved the development of a conceptual design plan, environmental documentation/approvals, and preliminary engineering. The interchange encompasses six major facilities with 69 interchange connections to be made. It has an average weekday volume of 320,000 vehicles through the interchange over 24 incoming lanes. Other major projects that Mr. Deuser served as project manager include: · International Mall, Site Development, Dade County, Florida · South Miami Avenue Bridge Replacement and Street Improvement Studies · 1-95, U.s. 1, and DuPont Plaza Area Transportation Improvements Study, Miami, Florida · Safety Evaluation of Priority Techniques for High-Occupancy Vehicles (HOV), Dade County, Florida · Enforcement of Priority Techniques for High-Occupancy Vehicles (HOV) Prior to joining BHA, Mr. Deuser was with the Florida Department of Transportation. Contact information: Bob Deuser Beiswenger, Hoch & Associates 510 Shotgun Road, Suite 400 Sunrise, FL 33326 Telephone: 954 334 2752 (Direct Line) Fax: 954 334 2800 Email address:bobd@bhaengineers.com Web site: www.bhaengineers.com 6 6. Listing of the proposed personnel to be assigned to the City's various potential projects, including their qualifications and experience. Robert Deuser, Vice President Qualification: BA, Political Science, Miami University, Ohio, 1970 MA, Economics, Miami University, Ohio, 1971 Experience: 33years with BHA Patrick Hayes, BSCE, Senior Field Engineer, CEI Qualification: BSCE, Cornell University, Ithaca, New York, 1984 ATSSA Worksite Safety Supervisor, Final Estimates, ACI Experience: 23 years with BHA (refer to form 330, page 2) George Sokola, BSCE, Field Inspector/ Engineer Qualification: BSCE, Massachusetts Institute of Technology, 1969 ASBI Grouting Certification Experience: 23 years with BHA (refer to form 330, page 2) Manuel Sanchez, Director of Structural Design Qualification: BSCE, Newark College of Engineering, 1973 Registration: Florida PE-27510, 1980 Experience: 37 years with BHA (refer to form 330, page 2) Delio Perez, PE, Senior Structural Engineer Qualification: BSCE, University of Ohio, 1954 Registration: Florida PE-10800, 1969 Experience: 23 years with BHA (refer to form 330, page 2) Soheila Sadough, PhD, PE, Senior Bridge Engineer Qualification: PhD, University of Miami, 1988. Registration: Florida PE-44130, 1991 Experience: 22 years with BHA (refer to form 330, page 2) Joseph Rojas, MS, Senior Highway Engineer Qualification: MSCE, University of Miami, 1986 Registration: Florida -In process of Renewing Experience: 24 years with BHA (refer to form 330, page 2) Manuel Vega, MS, PE, Senior Drainage Engineer Qualification: MSCE, (Hydraulics), University of Nebraska, 1977, MSCE (Environmental), University of Michigan, 1983 Registration: Florida PE-40695, 1988; Michigan PE-32117, 1986 Experience: 5 years with BHA (refer to form 330, page 2) 7 Felix Cebrecos, MSCE, Transportation Planner, Traffic Engineer Qualification: MS Urban-Regional Planning, University of Ohio, 1987 MSCE Environmental, Wisconsin University, 1975 Post Graduate/Mass Transportation, Switzerland, 1978 Experience: 21 years with BHA (refer to form 330, page 2) Andres R. Sanchez, General Contractor Qualification: BSCE, Environmental, University of Florida, 1985 Drilling Rig Supervisor, 1990 Registration: Florida CGC 1510667, 2005 Experience: 8 years with BHA (refer to form 330, page 2) Raul B. Rodriguez, PE, PLS Land Surveyor and ROW Engineer Qualification: BSCE University of Habana, 1954 Registration: Florida LS 2717, 1970 Experience: 40 years at BHA (refer to form 330, page 2) [ end] 8 SWORN STATEMENT ON PUBLIC ENTITY CRIMES PURSUANT TO SECTION 287.133(3)(A), FLORIDA STATUTES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICER AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to City of Sunny Isles Beach, Miami-Dade County, Florida by Robert B. Deuser, Vice President for Beiswenger, Hoch & Associates, Inc. whose business address is 510 Shotgun Road, Suite 400, Sunrise, FL 33326 and (if applicable) its Federal Identification Number (FEIN) is 59-0751610 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: 2. I understand that a "public entity crime" as defined in Paragraph 287.133(1 )(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any business with any public entity or with an agency or political subdivision of any other state or the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. I understand that "Convicted" or "Conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry of a plea of guilty or nolo contendere. 4. I understand that an "Affiliate" as defined in Paragraph 287.133(1 )(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "Affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "Person" as defined in Paragraph 287. 133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, director, executives, partners, shareholders, employees, members, and agent who are active in management of an entity. 6. Based on information and belief, the statement which I have marked below is true in relation to the Person submitting this sworn statement. (Indicate which statement applies.) X (1) Neither the Person submitting this sworn statement, nor any officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the Person, nor any Affiliate of the Person has been charged with and convicted of a public entity crime subsequent to July 1, 1989. _ (2) The Person submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in management of the Person, or an Affiliate of the Person has been charged with and convicted of a public entity crime subsequent to July 1, 1989. _ (3) The Person submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the Person, or an Affiliate of the Person has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the Person submitting this sworn statement on the convicted vendor list. (attach a copy of the final order) THE UNDERSIGNED UNDERSTANDS AND ACKNOWLEDGES THAT THE SUBMISSION OF THIS FORM TO MDX IS FOR MDX ONLY AND THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED WITH MDX. I ALSO UNDERST AND THAT I AM REQUIRED TO INFORM MDX PRIOR TO ENTERING INTO ANY CONTRACT WITH MDX OF ANY CHANGE IN THE INFORMA nON CONTAINED IN THIS FORM. <tZU-IS. ~/~ SIGNATURE OF AFFIANT Robert B. Deuser (Printed or Typed Legal Name of Affiant) State of Florida County of Broward Sworn to and subscribed before me this 18th day of May , 20 lQ by Robert B. Deuser, Vice President Linda S. Scotece ~jAY /J ",--Cfdu.~- Notary's Name Printed, Stamped or Typed Notary Sea ....rif.trU.... L1NDAS.SCOTECE l:rK~~ MY COMMISSION # DD 711648 ~'~'~l EXPIRES: December 13,2011 "1..l/r"FjI~'< Bonded Thru Notary Public Underwriters Personally Known: x or Produced Identification NON-COLLUSIVE AFFIDA VIT State of Florida County of Broward ) Francisco A. Norona, President, Beiswenger, Hoch & Associates, Inc. being first duly sworn, deposes and says that: (1) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has submitted the attached Bid; (2) He/she is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; (3) Such Bid is genuine and is not a collusive or sham Bid; (4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a collusive or sham Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any Bidder, firnl, or person to fix the price or prices in the attached Bid or of another Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through an collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work; (5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or parties in interest, including this Affiant. 7/11j/ tf}1J>1.c ;SIGNA TU E OF AFFIANT Francisco A. Norona, President (Printed or Typed Legal Name of Affiant) State of Florida County of Broward Sworn to and subscribed before me this 18th day of May ,201Oby Francisco A. Norona, President .t/ UNDA S. SCOTECE MY COMMISSION # DO 711648 EXPIRES: December 13, 2011 Bonded ThI\J Notary Public Underwriters Linda S. Scotece Notary's Name Prin Personally Known: X Identification Produced Or Produced Identification Notary ,c;.~tl~~..., "~~1:~' ~:~~~) ~.~iif.~~" 0- "" N O- N 0 >"" ~- V) 0:: <l: w > w > u: .... V) <l: c.. V) w ~ ~ u..u V)o V) V) w V) ~<l: 0:: J: c..U zO J: 0:: 0::' Ow O~ w Z .... w ~ 3: c.. !!! ~w Oeo u V) .... U w a 0:: c.. ...J ...J <l: ci '<t 0 ;;; :;: <') 0 ;;; 0 0 '<t :;: '<t 0 N <') lI) r-- '<t '" 0 '<t 00 Z N 0 0; N 0 N lI) ;;; 0 '" <') 00 lI) r:: '" N N <') W <0 <0 <') ;;; 00 <') '" 00 <') ;;; 0 <') <') <') ~ '" 00 <0 '<t '<t '<t lI) N lI) lI) 0 lI) N <0 '" N '? '<t N <') lI) '<t '<t Z ,..:. ,..:. 0 0, J, J, 0 ,..:. J, 0, 0, .,;. .,;. 0, ,..:. N J, N J, ,..:. ,..:. 0 N :I: r-- r-- r-- '" r-- r-- r-- r-- r-- '" '" 0 <') '" r-- 0 r-- <') r-- r-- r-- a. r-- r-- '<t lI) <') <') '<t '<t <') '<t lI) '<t <') '<t 00 r-- N <') lI) <') r-- r-- w .,;. J, J, J, J, J, J, J, J, J, J, M .,;. J, J, .,;. <D J, ,..:. J, .,;. .,;. ...J lI) 0 0 0 0 0 0 0 0 0 0 0 lI) 0 0 lI) 00 0 0 0 lI) lI) w '" <') <') <') <') <') <') <') <') <') <') r-- '" <') <') '" r-- <') '<t <') '" '" f- >- I1l N N C I1l ~ "'" I1l <ll c e <ll Qj <ll 0 >- Ol Ul <ll ::J Ol C I1l I1l > C > 0 ::J ~ I1l C n; Ul c <ll n; c 0 n; 0 <ll 'Qj I1l ::J n; C f- Ol Cl. I1l I1l 0 I1l E 0 I1l 2 () Ol n; I1l Qj I1l J:: U ~ E J:: 2' iY J:: iY B Ol U) Z 0 ::J ~ () c iY ....J Q; <( 0 >- ro 0- > 0 <.) I1l <.) <ll ::J 0 > <ll I1l E I1l f- 0 J:: :::; Qj Qj 0 <ll 0 <ll ....J Qj ....J ~ Z c:: c t9 c (J) t9 () c:: c:: <.) 0 f- 0 I1l ::J 0 ::J "'" Ul .~ Ol Ul ::J n; ~ c Ul >- C Ol Ul "0 Ol 'iij >- 0 '0 <ll ~ 0 '5 <ll Ol ,!!! U :0 J:: I1l "0 I1l ~ I1l "0 ~ J:: "0 0 C 0 Ul :0 ...., ....J 0 ~ Ol Ui I1l 0 ...., C ....J ...., 0 "'" c cO I1l 0 I1l ...., 0 <ll Z ...., <l: f- ~ <l: U::: ...., z c:: ....J Ol Ol <ll C C Ol .~ <ll <ll >- .~ <.) ~ J:: >- >- O/l C ....J C C '<t '<t <0 <ll "0 "0 <0 <0 <ll ....J <0 0 '<t () <ll '<t '<t c I1l I1l n; ::J C I1l ::J "'" ::J t3 t3 t3 '6> 9 9 t3 Ul 0 ~ '6> -0 t3 <.) .g <ll 0 '6. 0 ~ t3 ';:: ';:: ';:: ';:: E <ll <.) ';:: [D <.) c <.) ';:: .... Ui Ui Ui c E >- E >- Ui E ro Ui c <l: 2 Ui ro Ui ~ Ui Ui z w C C <ll W ~ E c Ul <ll <ll W (5 (5 (5 J:: I1l ::J I1l ::J (5 ::J '0 "0 (5 J:: (5 0 (5 <ll "0 f- "0 (5 (5 :; ~ ~ ~ () ,- 0 ,- 0 ~ c:: 0 I1l ~ () :r: :.::; .~ ~ ~ I1l I1l I1l ~ ~ U <ll ~<.) ~<.) Ul 9 <ll L.L f- 9 "0 9 0 0 0 I-;- 0 "OUl 0 I-;- I1l 0 Z 0 >- 0 0 0 0 0 ~ ~ 0 ';; <l: 'E 0 c 0 I1l 0 c 'E "g E 0 0 :; CL CL I1l :; 0 c L.L L.L L.L L.L I1l L.L 0 L.L "0 L.L ::J I1l LL I1l L.L L.L Ul 0 0 0 ~ Ul "g (J) ~ ~ c c Z 0 0 LL <.) <.) 0 _w W Wf- '" '" <0 00 <0 <0 r-- CD '" 00 '" <0 lI) r-- r-- 0 0 r-- <0 > r-- r-- >w -...J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 i= 0 0 f-a. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U::; N N N N N N N N N N N N N N N N N N N <.) N N <(0 <l: U Ul <ll Ol ~ <ll () Ol It ';; c .~ Cl. I1l W <ll n; x ro t3 ::; <ll ~ W <( Ol Ol (J) <ll t9 ~ <ll C c <ll <ll C <ll t3 Ol Z I1l .;; '6> Ol C <ll I1l Ol <ll <ll C f- Ol J:: <') J:: "0 <ll C .0 C 'Q 0 I1l .,j U c () '<t () ~ c:: w 0 :.;< <.) J:: > W I1l n; It <') n; <0 Ol J:: ro "0 a: () c <ll as -, J:: "0 E t3 '" ~ .g <ll c () > >- n; <ll Ul 0 () I1l ~ E t5 Ol ~ <ll CL as n; <ll E ::J Ul a:: n; 0 c:: :0 "0 <ll > E 0 <ll C Ul Ui ~ '5 <ll ro ~ <ll J:: a. E c:: "0 (J) Q; ~ I1l "'" Ol "'" <ll c c:: 0 t3 9 [D 0 ~ ro ~ (J) 00 0, <ll il: <ll <.) >- ~ 0 ro t:: <ll ~ I1l >- 2 C "0 <ll O/l 0 CL E >- '<t <l: .0 () ai U) C c () 0 c ~ @) 0 ~ Ui I1l ~ <.) "0 c:: e- o ~ Ul > Ul ~ ::J C 2 :t "'" c U) ::J CL <ll c J:: ~ <l: Ul <0 0 0 :; >- 0 I';- ro I1l 0 (J) 0 <l: Ol <i: () ~ > Ol <ll "E >- l' <ll <') <.) <.) Ul "'" W c :;;: "0 <.) <ll W c '(ii J:: <ll C N 5- ~ <ll c J:: I1l 0 I1l c <ll "'" <ll :2 I1l <ll () "'" i:i5 "0 X "0 <ll 0 ,Q> Cl. <.) ~ 0 I1l "0 '6. "0 '5 J:: 0 I1l 0 ::J W Z I1l "0 <.) 0 ~ I1l E () <ll - 0 c ~ :r: .B z I I1l [D Q:; 0 [D - <0 <.) I1l J:: (0 2 ro <ll <0 - 2 ~ 0 00 lI) N 1;; I1l N () Q:; <l: t9 Q; I1l ~ ~ c E E N 00 <ll ~ <ll 00 E .;:: ~ .d: E "0 00 E f- 'E Ol ci "0 ro Ui c 'g C '(ii lI) ro c:: c:: I1l W c:: I1l <ll :r: :r: ro c:: <ll ,!l1 W I1l <ll (J) CL (J) (J) 0 z I (J) ~ (5 t9 L.L [D CL LL (J) <.) :::; <.) ~ 0 I';- 0- ~ N O- N 0 >N ~- V') c::: <( w > w ~ u.. l- V') <( c.. V') c::: w 0 ~ u.. U V') 0 V') W V') U V') 0 <( c::: :I: c.. U Z 0 :I: c::: c:::~ 0 w C ~ w Z I- w w ~ ...J c.. !!2 :i: w 0 CO U V') I- U w .... 0 c::: c.. ...J ...J <( ci <i) (") ~ CJ) 0 'OJ" 0 N Lf) <i) 0 Lf) 0 .... 0 (") N 0 0 .... .... Z (") 'OJ" ~ <i) ;:::: N .... CO 0 .... 0 ;:::: 0 'OJ" 'OJ" Lf) CO Lf) UJ (") (") CO N CO (") Lf) CJ) .... Lf) Lf) O? N U; (") Lf) N Lf) ".' Lf) (") <i) Lf) N Lf) <i) .... <i) 'OJ" .... Lf) t';- N N 'OJ" N Z 0 .,J. ,.:. 0 ,}, ,}, .,J. ,.:. ,}, M ,.:. ,}, ,.:. cD 0 cD ,.:. .,J. 0 N ~ U; J: .... <i) Lf) .... .... .... 0 .... Lf) Lf) .... 'OJ" CJ) ;:::: .... (") .... <i) <>. (") 'OJ" N (") 'OJ" (") (") 'OJ" 'OJ" <i) <i) 'OJ" <i) .... Lf) .... <i) (") .... N UJ .,J. ,}, ,.:. .,J. ,}, ,}, ,}, M ,}, .,J. .,J. ,}, ,.:. .,J. ,}, .,J. ,}, ,}, N .,J. ,}, ...J Lf) 0 0 Lf) 0 0 0 0 0 Lf) Lf) 0 0 Lf) 0 Lf) 0 0 .... Lf) 0 UJ CJ) (") 'OJ" CJ) (") (") (") .... (") CJ) CJ) (") 'OJ" CJ) (") CJ) (") (") .... CJ) (") .... N Q; e Q; Q) e .!: .!: 0 ro >. N e '1: E 'Qj ro ro u ro (/) e ro .~ ro 2 0 (/) ~ :J Q; Q; .~ e 'g (/) ~ .... (/) ro 0 u; ro Q) Q) "0 ;: '0 ro '1: (/) e U :J E (9 rn u a: .!: (/) "0 --' (/) ~ .><: e u > Q) e 'Qj :.J <( C( "0 ro ~ e u .!: 0 (/) a: [II .!: .... 0> 0 "0 [II --' Q; e iii :::E e ro U 0 z ...: z Q) 0 "0 (9 ~ 0 0 Q) > Q) >. Q; --, e 0 0> l- e .Q) (/) :J .2 E .!: Q) E '1: >. >. .><: Q) :J "S ro ::.! 0 ro Q) (/) '5 0> ro UJ rn ~ U <( e :J 0 --' ~ '1: ro .!: 5- ro ,!!1. C( e ro > ro Q) Q; (/) --, e C( (/) ro C( :> :::E :::E Cl. (9 LL Q) ~ --, 0 0> >. >. U e C C 0> 0> e e 0> (/) 0 'OJ" Q) >. <i) .!: e 0 ro 0 Q) e Q; 'OJ" OJ Q; .><: C :J :J Q; ;: (/) .~ TI ~ e t5 '0. t5 0 0 ro E .~ ';; ":fi .!: t5 ., Q) ';: e :J ';: U U Q) .!: Q) 2 0 ro :::E '0 ';: "S .... e u; 0 u; <{ e (/) Q) e .!: 0 Q) u; (/) z .5> 5 u Q) Q) ~ '5> u; '5> u; .><: C. 0 e lli e UJ e i:5 I- "0 i:5 "0 "0 e .!: >. e e ro 0 '0 U '5> i:5 0 ::; ro ro J: (/) (/) > e e W ...:. ro ~ ...:. 9 9 w Q) w 0 U e W 0 ...:. u U "0 LL "0 e U >. <{ W (/) Q; 0 "g 0 E 'E ~ e ro ,!: ,!!1. [II ;: U e 0 U (/) 0 0 0 iii .= ~ "0 :> I- 0 .!: 0 <{ (/) LL u:: lli LL ro ro rn rn z I- U 0 LL :J ~ ~ :::E :::E .c J: [II --, W C( .c :J J: C _UJ UJ.... co CJ) 0 Q) 0 0 co Q) Q) CJ) CJ) Q) CJ) 0 0 Q) Q) Q) Q) Q) Q) >UJ 0 0 0 > 0 0 > .::: 0 0 ,::: 0 0 0 > > > .::: > > -...J TI 0 TI TI U TI TI U ....<>. 0 0 0 t5 0 0 t5 0 t5 U::E N N N <{ N N N <{ <{ N N <{ N N N <{ <{ <{ <{ <{ <{ <(0 U Q) (/) e 0 :2 c. (/) Q) '5 Lf) Q) >. [II C( "0 OJ 'It >. :J e e ;;:- UJ t5 Ci5 (/) ro OJ ::E Lf) U .!: '(ii t5 <( CJ) ~ N Q) e W Q) u Z co >. C (/) 0> Q) U Q; Q) ';: "0 C Q) 0 "0 0> O/l ';; E e. u; .... ro N :J N 0 e Z ~ Q; 0 Q; i:5 U 0 Lf) 0 ~ U ro t5 E Cl. (/) (/) UJ C( C( U --' t:: -0 <i) Q) -, ~ ~ >. ~ e W Q) 0> (") 0> (/) 0 0> "0 C( Q) Q) ro > > e co "0 Q) > :0 O/l a: 0 Q) ~ (/) 5 C ';: "S ili .~ to ~ u <>. --, .><: >. '(ii 0 u; e C U N '~ e O/l '0. (/) Q) U Q) 0> ro (/) Q) co 0> 0 ~ > "0 'S '(ii 5 x ro e Q; Q) '(ii Q) e lli >. Q) 0> Q) 0 6 '5> C( > (/) c ~ Q) Q) .><: 5 Q) C( e Cl. 0 ro [II 0> e (/) Q) rn 0 '0. I- .2 (/) :J .~ u; e (/) W --' e cD :J 0 Q) "0 '5 (/) Q) Q; ~ ro .2 ;: 5 (/) 5 ro U :J Q) ro Q) C( > --' Q) t5 Q) <i) e (/) U e e 0 [II 5 0 ';; 0 5 I- Q) Q) Q) '5> C( 0:: '5 Q; e ;: --' 2 t5 :c u Q) "0 > Q; t5 Q) Q) [II > ro 0> Q) Lf) t5 @) ';: u S ;::; ro <{ e >. C 0:: 0> 0 0 '(ii ';; E u; ro Q; 'S 9 w ro 2 "0 ro Q) Q) C( u 2 >. i:5 Q) I- .!: <{ [II Q) Ci5 0> ~ .~ (/) 0 0 C( ~ .'i Ci5 Q) [II (/) 'E ;:::: u e Q) ~ ,!!1 ~ .!: E .!: OJ e Lf) Q; Lf) w W ro ~ t:: e ~ Lf) .><: "0 ;: CJ) ~ ~ :J ~ :;j: "S ~ J: 0 'a; (/) ".' ro ~ 0 "i' Q) (/) (/) U --, Z LL Z --, 0 u: > I- Cl. ::l 0 0 ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1, TITLE AND LOCATION (City and State) RFQ #10-04-01 Professional Engineering Services 2 PUBLIC NOTICE DATE Opening Date and Time: Wednesday, May 26,2010,2:00 P,M. 3, SOLICIT A TION OR PROJECT NUMBER 10-04-01 B. ARCHITECT-ENGINEER POINT OF CONTACT 4, NAME AND TITLE Robert B, Deuser, Vice President 5, NAME OF FIRM Beiswenger, Hoch & Associates, Inc, (BHA) 6, TELEPHONE NUMBER 7, FAX NUMBER 954-334-2752 (Check) a: ,a: LJ.J LJ.J 20 9, FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT ~ >2 Of- ,f- Uu a: ,a: [])~ a. ~ :Ja: a. Ulf- 510 Shotgun Road, Suite 400 a. Beiswenger, Hoch & Associates, Inc, Sunrise, FL 33326 954-334-9000 X o CHECK IF BRANCH OFFICE 954-334-2800 Fax b. o CHECK IF BRANCH OFFICE C. o CHECK IF BRANCH OFFICE d. o CHECK IF BRANCH OFFICE e. o CHECK IF BRANCH OFFICE f. I n CHECK IF BRANCH OFFICE 954-334-2800 bobd bhaen ineers,com C. PROPOSED TEAM (Comp/ete this s.ection for the prime contractor and all key subcontractors.) D. ORGANIZATIONAL CHART OF PROPOSED TEAM ~ (A ttached) STANDARD FORM 330 (6/2004) PAGE 1 AUTHORIZED FOR LOCAL REPRODUCTION CITY OF SUNNY ISLES BEACH Project Manager BHA Project Contact ~ Robert Deuser Structural Engineering Manuel Sanchez, PE Delio Perez, PE Soheila Sadough, Ph 0, PE -( Field Inspection Patrick Hayes, BSCE George Sokola, BSCE Civil Engineering Joseph Rojas, MSCE Mariela Cuba, PE Manuel Vega, PE Felix Cebrecos, MS -()- Arch itectu re Raul Rakela, RA Surveying Raul Rodriguez, PSM -()- Estimating I Builder Ramiro Sanchez, CGC 12, NAME E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13, ROLE IN THIS CONTRACT Manuel R. Sanchez, P.E. Director of Structural Design 15, FIRM NAME AND LOCATION (City and State) Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 16. EDUCATION (DEGREE AND SPECIALlZA nON) 17, Structural Designer 14. YEARS EXPERIENCE a, TOTAL 371b WITH CURRENT FIRM 37 CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) B,S,C,E, /1973 / New College of Engineering Professional Engineer Florida 27510 (1980) 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc,) American Society of Civil Engineers, American Segmental Bridge Institute, American Concrete Institute, PrecasUPrestressed Concrete Institute 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) 121 YEAR COMPLETED Newport Fishing Pier PROFESSIONAL SERVICES) I~ONSTRUCTION (If applicable) City of Sunny Isles Beach, FL 2010 Under Final Review by City a. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Engineer of Record and Chief Structural Designer of the 602 foot long Newport Fishing Pier located in Sunny Isles Boulevard and Collins Aveue, The Structural Plans are completed and under review, Engineer Cost Estimate $4,5 M, 11) TITLE AND LOCATION (City and State) 121 YEAR COMPLETED The North Bay Road Pedestrian & Emergency Vehicle Bridge, Extension of North Bay Road PROFESSIONAL SERVICES)I~ONSTRUCTION (If applicable) from 172nd to 174th Street, City of Sunny Isles Beach, FL 2010 Under final review by City 13) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm b. Engineer of Record and Chief Structural Designer, The bridge is under the final design phase and is composed of five (5) simple supported spans with new Florida 1-36 beams with exterior haunch beams, Engineer Cost Estimate $1,9 M. 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Gwen Margolis Park PROFESSIONAL SERVICESllCONSTRUCTION (If applicable) City of Sunny Isles Beach 2009 2009 C. 13) BRIEF DESCRIPTION (Brief scope. size. cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm Engineer of Record and Chief Structural Designer of the foundation mounted on Augercast Piles for the Prefabricated BR Building, Cost $75,000 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED NW 21 st Avenue Pedestrian Bridge over C-13 Canal PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) Broward County, FL 2008-2009 Under Construction d. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm Engineer of Record and Chief Structural Designer of this tubular truss pedestrian bridge with concrete deck and approach ramps meeting ADA requirements, This structure gives full accsess to school/pedestrian access, (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED Pedestrian Bridge over Dressel's Dairy Canal PROFESSIONAL SERVICES 31CONSTRUCTION (If applicable) Miami-Dade County, FL 2003 2004 13) BRIEF DESCRIPTION (Brief scope. size, cost, etc,) AND SPECIFIC ROLE lXJ Check if project performed with current firm e. Engineer of Record and chief Structural Designer of this tubular truss pedestrian bridge with concrete deck and approach ramps meeting ADA requirements. Cost $340,000, STANDARD FORM 330 (62004) PAGE 2 Continuation Sheet 12, NAME E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Camp/ete one Section E for each key person,) 13, ROLE IN THIS CONTRACT Delio Perez, as, Structural Engineering 15. FIRM NAME AND LOCATION (City and State) Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 16, EDUCATION (DEGREE AND SPECIALlZA TlON) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) Senior Structural Engineer 14, YEARS EXPERIENCE a. TOTAL 50lb, WITH CURRENT FIRM 23 B,S,C,E, /1954/ Civil Engineering, University of Ohio, Ohio 1954 Professional Engineer Florida 10800 1969 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards, etc,) (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Newport Fishing Pier PROFESSIONAL SERVICESllCONSTRUCTION (If applicable) City of Sunny Isles Beach 2010 a. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm Member of the Design Team for the Newport Fishing Pier replacement in the City of Sunny Isles, The new replacement pier incorporate methos to reduce damage from storms and increase reliablity and performance of the structure, The structure, restaurant and railing meet ADA requirements and some amenities for fishing activities. The total cost of the project is $4,5 M (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED NW 21st Avenue Pedestrian Bridge over C-13 Canal PROFESSIONAL SERVICES31 CONSTRUCTION (If applicable) Broward County 2008 2009 b. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc,) AND SPECIFIC ROLE lrJ Check if project performed with current firm Member for the Design Team for the N.w. 21 st Avenue Pedestrian Bridge Over C-13 Canal in Broward County, The structure is a tubula truss with concrete deck and concrete approach ramps meeting ADA requirements, This structure gives full accsess to school/ pedestrian access, (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED Pedestrian Bridge over Dressel's Dairy Canal PROFESSIONAL SERVICES31CONSTRUCTION (If applicable) Miami Dade County 2003 c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Member of the Design Team for this pedestrian bridge over Dressel's Dairy Canal in Miami Dade County, Project Cost $ 340,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Broward County Central Library PROFESSIONAL SERVICES II CONSTRUCTION (If applicable) 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE lrJ Check if project performed with current firm d. Member of design team for escalator/stair replacement and redesign. Cost $ 0.7M. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Norona Limited, LLC Office Building PROFESSIONAL SERVICES ~ICONSTRUCTION (If applicable) Sunrise, FL 2004 2005 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE l.XJ Check if project performed with current firm e. QC + QA for Structural Design - For this Design-Build project. Five-story Office Building, 75,000 sf of construction + 300 parking spaces parking lot and landscaping. Cost $8M, 19. RELEVANT PROJECTS STANDARD FORM 330 (62004) PAGE 2 Continuation Sheet 12, NAME E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Camp/ere one Secrian E for each key person,) 13. ROLE IN THIS CONTRACT Soheila Sadough, PhO, PE Senior Structural Engineer 15, FIRM NAME AND LOCATION (City and State) Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 16, EDUCATION !DEGREE AND SPECIALlZA TlON) 17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) Structural Designer 14, YEARS EXPERIENCE a, TOTAL 281b' WITH CURRENT FIRM 22 PhD Civil Engineering/1988/University of Miami, FL MSCE/1983/University of Alabama BSCE/1981/University of Alabama Professional Engineer Florida 44130 (1991) 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. A wards. etc,) Member of American Society of Civil Engineers (ASCE) Member of Board of Directors, American Segmental Bridge Institute (ASBI) 1 9. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Newport Fishing Pier PROFESSIONAL SERVICES II~ONSTRUCTION (If applicable) City of Sunny Isles Beach, FL 2010 Under Final Review by City a. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm Senior Structural Designer of the 602 foot long Newport Fishing Pier located in Sunny Isles Boulevard and Collins Aveue, The Structural Plans are completed and under review, Engineer Cost Estimate $4,5 M, (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED The North Bay Road Pedestrian & Emergency Vehicle Bridge, Extension of North Bay Road PROFESSIONAL SERVICES II~ONSTRUCTION !If applicable) from 172nd to 174th Street. City of Sunny Isles Beach, FL 2010 Under final review by City 131 BRIEF DESCRIPTION (Brief scope. size. cost, etc,) AND SPECIFIC ROLE lXJ Check if project performed with current firm b. Senior Structural Designer. The bridge is under the final design phase and is composed of five (5) simple supported spans with new Florida 1-36 beams with exterior haunch beams, Engineer Cost Estimate $1.9 M, 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Gwen Margolis Park PROFESSIONAL SERVICES IICONSTRUCTION (If applicable) City of Sunny Isles Beach 2009 2009 c. 131 BRIEF DESCRIPTION (Brief scope, size. cost. etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm Seniorf Structural Designer of the foundation mounted on Augercast Piles for the Prefabricated BR Building, Cost $75,000 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED NW 21 st Avenue Pedestrian Bridge over C-13 Canal PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) Broward County, FL 2008-2009 Under Construction d. 13) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm Senior Structural Designer of this tubular truss pedestrian bridge with concrete deck and approach ramps meeting ADA requirements. This structure gives full accsess to school/ pedestrian access, 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pedestrian Bridge over Dressel's Dairy Canal PROFESSIONAL SERVICES tONSTRUCTION (If applicable) Miami-Dade County, FL 2003 2004 131 BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE l.XJ Check if project performed with current firm e. Senior Structural Designer of this tubular truss pedestrian bridge with concrete deck and approach ramps meeting ADA requirements, Cost $340,000, STANDARD FORM 330 (62004) PAGE 2 Continuation Sheet 12, NAME E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Comp/ete one Section E for each key person.) 13. ROLE IN THIS CONTRACT Joseph Rojas, MSCE 15, FIRM NAME AND LOCATION (Citv and State) Beiswenger, Hoch & Associates, Inc, 510 Shotgun Road, Suite 400, Sunrise, FL 33326 16, EDUCATION (DEGREE AND SPECIALlZA nON) 17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) Senior Highway Engineer 14, YEARS EXPERIENCE a, TOTAL lb. WITH CURRENT FIRM 241 24 MS/1986/Civil Engineering, University of Miami BS/1983/Civil Eningeering, University of Miami BS/1983/Architectural Engineering, University of Miami 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, ete,) , 9. RELEVANT PROJECTS (1) TITLE AND LOCATION (CitV and State) (2) YEAR COMPLETED State Road 816 (Oakland Park Blvd), from Powerline Road to Bayvie Drive PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Browrd County, FL, FDOT District 4 2004 - 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE X Check if project performed with current firm a. Project Manager for the 3 mile project for FDOT District 4 from east of 1-95 to Bayview Drive. The project includes milling & resurfacing the existing pavement, addressing safley concerns and bringing roadway and structure features up to current resurfacing, restoration and rehabilitation, FM #41379515201 Contact: Nadir Rodriques, PE (954) 777-4385. Cost $1,164,000, (1) TITLE AND LOCATION (Citv and State) (2) YEAR COMPLETED MDX Project No, 11205,020 Master Plan PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Miami-Dade, FL 2006 - 2007 (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc,) AND SPECIFIC ROLE X Check if project performed with current firm b, Project Engineer for development of the Master Plan for the SR-836/SR-112 Interconnector in Miami. This 3 mile project was undertaken by the Miami-Dade Expressway Authority to interconnect SR-836 and SR-112, as well as the ramps to and from the MIC, the Miami International Airport and a number of local streets, Contact: Alfred Lurigados, P,E. (305) 637-3277. Cost $1,985,443. (1) TITLE AND LOCATION (Citv and State) (2) YEAR COMPLETED SR-5/ US-1 Brickell Avenue Bridge Widening PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Miami-Dade, FL 2005 - 2006 2006 (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.! AND SPECIFIC ROLE X Check if project performed with current firm c. Project Engineer on this fast-track project to widen the Brickell Avenue bridge by one lane in the NB direction. The project included widening of the north bridge approach span and widening of the north bridge access ramp, FM #24910225201, Contact: Teresita Alvarez (305) 470-6721, I IT lany (2) YEAR COMPLETED Improvements PROFESSIONAL SERVICES CONSTRUCTION ((f applicable) Miami-Dade County, FL 2002 - 2005 2005 (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc,) AND SPECIFIC ROLE X Check if project performed with current firm d. Project Manager for the roadway improvements which consisted of widening and reconstruction of NW 72nd from 2 to 4 lanes with painted median, curb and gutter, sidewalks, signing and pavement markings, signalization, concrete barrier walls, sound walls and the addition of a bridge spanning the Miami River connecting to SR 25, thus providing NB continuity of the arterial. Drainage system was reconstructed with exfiltration trenches, Cost $ (1) TITLE AND LOCATION (CitV and State) SR-80 / Southern Blvd, from SR-7 to Floirda's Turnpike Palm Beach County, FL, FDOT 4 (3) BRIEF DESCRIPTION (Brief scope. size, cosT. etc,) AND SPECIFIC ROLE (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION ((f applicable) 2001 - 2003 e, Joseph Rojas prepared the Electronic Delivery for this project, which included the widening from 4 to 8 lanes of 2,62 miles of road, a new 3-span bridge along the main line and a new bridge over the C-51 Canal. Cost: On-going job starting 1993 to 2008 $28 M, X Check if project performed with current firm STANDARD FORM 330 (6 2004) PAGE 2 Continuation Sheet 12 NAME E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13, ROLE IN THIS CONTRACT Rina Mariela Cuba, P.E. 15, FIRM NAME AND LOCATION (City and State) Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 16, EDUCATION !DEGREE AND SPECIALlZA nON) 17, CURRENT PROFESSIONAL REGISTRA TION (STA TE AND DISCIPLINE) Highway Engineer 14. YEARS EXPERIENCE a. TOTAL Ib, WITH CURRENT FIRM 141 5 BSCE/1992/Pontifical Catholic University, Lima, Peru Civil Engineer/1994/Pontifical Catholic university, Lima, Peru Professional Engineer Florida 65564 (2006) XII International Highway Course Polytechnic, University of Madrid, Spain Professional Engineer Lima, Peru 46770 (1994) 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) 19, RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED Julia Tuttle Causeway/SR-112/1-195 Milling and Resurfacing PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) Miami-Dade County, FL 2006 - 2008 2008 a. 13) BRIEF DESCRIPTION (Brief scope, size. cost, etc,) AND SPECIFIC ROLE lXJ Check if project performed with current firm Deputy/assistant Project Manager for this 3.1 mile project which consists of milling and resurfacing, signing and pavement markings and utility coordinat (letting date: Feb. 2009), Performed all necessary coordination with the dept's project manager as well as with District 6's offices of Design Pavement Design, Utility, Right-of-Way, Drainage, Traffic Operations, Specifications, Construction and Final Design, Cost $276,742, 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED 1-751 SR-93 Milling and Resurfacing PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) Miami-Dade County, FL FDOT 6 2006 - 2008 b. 13) BRIEF DESCRIPTION (Brief scope, size. COSI, etc,) AND SPECIFIC ROLE l.XJ Check if project performed with current firm Assistant Project Manager tha tincluded milling and resurfacing, signing and pavement markings and safety analysis of 5,5 miles of 1-75, Performed all necessary coordination with the dept's project manager as well as with District 6's offices of Design Pavement Design, Utility, Right-of-Way, Drainage, Traffic Operations, Specifications, Construction and Final Design, Cost $248,983, (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED 1-95/ SR-9 Bridge over the C-17 (Congress Avenue) Canal PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) Palm Beach County, FL FDOT 4 2007 - 2008 C. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm Project Engineer for this .3 mile design-build project with Hubbard Construction Company - in charge of developing roadway and MOT plans related to the construction of a single span concrete bridge over the existing C-17 box culvert. Contact: James Hughes (954) 777-4419. (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED State Road 816 (Oakland Park Blvd), from Powerline Road to Bayvie Drive PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) Browrd County, FL, FDOT District 4 2004 - 2009 2009 d. 13) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm Senior Roadway Engineer for the 3 mile project for FDOT District 4 from NW 10th Terrace to Bayview Drive, The project includes milling & resurfacing the existing pavement, addressing saftey concerns and bringing roadway and structure features up to current resurfacing, restoration and rehabilitation, FM #41379515201 Contact: Nadir Rodriques, PE (954) 777-4385, Cost $1,164,000. 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Blue Ridge Parkway PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) North Carolina - FHWA 2004 - 2006 (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc,) AND SPECIFIC ROLE l.XJ Check if project performed with current firm e. Project Engineer on two projects, consisting of milling and surfacing and rehabilitation of a total of 32.4 miles of the Blue Ridge Parkway, including overlooks, parking areas, development areas and access roads, The projects comprised milling, pavement patching, stone curb replacement, minor bidge repair and drainage improvements, including drainage structure evaluation and replacement. Cost $5 M, STANDARD FORM 330 162004) PAGE 2 Continuation Sheet 12, NAME E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person,) 13. ROLE IN THIS CONTRACT Manuel A. Vega, P.E. 15, FIRM NAME AND LOCATION (City and State) Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 16. EDUCATION (DEGREE AND SPECIALlZA TlON! 17 CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) Senior Drainage Engineer 14, YEARS EXPERIENCE a, TOTAL Ib, WITH CURRENT FIRM 331 5 BS/1975/Civil Eningeering, National University of Nicaragua MS/1977/Hydraulic Engineering, University of Nebraska PE 40695 (1988) Florida MS/1983/Environmental Engineering, University of Michigan PE 32117 (1986) Michigan 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards. etc.! American Society of Highway Engineers 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED State Road 816 (Oakland Park Blvd). from Powerline Road to Bayvie Drive PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) Browrd County, FL, FDOT District 4 2004 - 2009 2009 a. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.! AND SPECIFIC ROLE ~ Check if project performed with current firm Lead Drainage Engineer - Performed the pavement design on this Milling and Resurfacing project for FOOT 4, The project length is 3.0 miles. FM #41379515201 Contact: Nadir Rodriques, PE (954) 777-4385, Cost $1,164,000, (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FHWA Highway & Bridge Engineering, PRA-BLRI2D15, 2H13, J16 PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) Boone & West Jefferson, NC 2003 - 2009 b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE lXJ Check if project performed with current firm Senior Drainage Engineer - These two projects consist of milling and surfacing and rehabilitating 13.3 miles and 19.1 miles of the Bule Ridge Parkway, overlooks, parking areas, development areas and access roads, The project includes milling, pavement patching, stone curb replacement, minor bridge repair and drainage improvements including evaluation, Contract 1 Cost $1,5 M, Contract 2 Cost $5 M, (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Central Island Drainage and Street Improvements PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) City of Sunny Islea Beach, FL, Miami-Dade County 2005 - 2010 C. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE ~ Check if project performed with current firm Drainage Engineer for the Value Engineering Study and Final Design for this project, which was comprised of 26 drainage wells for drainage and flood control and street rehabilitation, Contact: Rick Conner (305) 792-1928. Cost $ (1) TITLE AND LOCATION (City and SIBle) (2) YEAR COMPLETED VA -Medical Center, New Offices & Warehouse PROFESSIONAL SERVICES ICONSTRUCTION (If applicablel West Palm Beach, FL 2005 - 2007 2007 d. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Drainage Engineer - BHA was the Engineer of Record for the Civil Plans of the Office-Warehouse building the VA-Medical Center, which includes paving, grading, drainage, water and sewer, The paving included the design of parking areas of previous concrete as well as rigid pavement, Cost $1,3 M, (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sunny Isles Beach Community School PROFESSIONAL SERVICES llCONSTRUCTION (If applicable) Miami-Dade County, FL 2008 (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc,) AND SPECIFIC ROLE l.XJ Check if project performed with current firm e. Engineer of Record for the Drainage Design on the new school for Sunny Isles Beach, The Drainage design consists of 8-gravity deep well to drain the 2,09 acres of school site plus 2,26 acres of surrounding streets for a total drainage area of 4.35 acres. Contact: Mr. Jorge Vera (305) 792-1912, STANDARD FORM 330 (62004) PAGE 2 Continuation Sheet 12, NAME E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13, ROLE IN THIS CONTRACT Felix Cebrecos, MSCE 15, FIRM NAME AND LOCATION (City and State! Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 16, EDUCATION (DEGREE AND SPECIALlZA TION! 17. CURRENT PROFESSIONAL REGISTRATION ISTA TE AND DISCIPLINE! Transportation Planner / Traffic Engineer 14, YEARS EXPERIENCE a, TOTAL Ib, WITH CURRENT FIRM 341 21 MS, Urban and Regional Planning/1987/0hio State University Post Graduate Mass Transportation/1978/Ecole Poly technique de Lausanne (Switzerland) MS, Science, Civil and Environmental Engineering/1975/University of Wisconsin Professional Engineer Peru 1576 (1968) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. A wards. etc.! Institute of Transportation Engineers International Road Federation (1) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED SR-112 / 1_195 Milling and Resurfacing PROFESSIONAL SERVICES ICONSTRUCTION (If applicable! Florida DOT - District 6 2006-2008 2008 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE ~ Check if project performed with current firm a. Milling and Resurfacing from East of West Shore Waterway to West of Alton Road. Mr, Cebrecos developed signing and marking plans for this 3.1 mile milling and resurfacing project. FM #40557845201 Contact: Jose Barrera (305) 470-5260 (1) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED SR-93/ 1-75 Milling and Resurfacing PROFESSIONAL SERVICES ICONSTRUCTION (If applicable! Florida DOT - District 6 2006 - 2008 2008 13) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE l.XJ Check if project performed with current firm b. Milling and Resurfacing from SR-826 to the Broward County Line in Dade County. Mr. Cebrecos prepared the signing and marking for this 5,5 mile project that included milling & resurfacing, signing and pavement markings and safety analysis. FM #25163025201 Contact: AIi Toghiani (305) 470-5343 (1) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED SR-816 / Oakland Park Blvd, Milling and Resurfacing PROFESSIONAL SERVICES ICONSTRUCTION (If applicable! Broward County, FL 2004-2008 2008 C. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Milling and Resurfacing from NW 10th Terrace to Bayview Drive in Broward County. Mr. Cebrecos prepared the signing and marking for this 3 mile project which consisted of milling and resurfacing of the existing facility. FM #41379515201 Contact: Nadir Rodrigues, PE (954) 777-4385 (1) TITLE AND LOCATION (City and State! 12) YEAR COMPLETED NW 7th Avenue/SR-7 Reversible Flow Lane Study PROFESSIONAL SERVICES ICONSTRUCTION (If applicable! Miami-Dade County PWD 2007 - 2008 d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE L0J Check if project performed with current firm Mr. Cebrecos provided traffic engineering overview and quality control this 7 mile long PD&E study to evaluate the conversion of NW 7th Avenue/SR-7, from NW 5th Street to NW 119th Street. to a reversible lane operation during periods of daily peak traffic. Contact: Mike Riera (305) 375-5820 11) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED SW 112th Avenue Traffic Study PROFESSIONAL SERVICES ICONSTRUCTION (If applicable! Miami-Dade County 2005-2006 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE l.XJ Check if project performed with current firm e. Mr. Cebrecos served as Traffic Engineer on this traffic study to improve traffic flow characteristics in conjunction with traffic calming measures within a 1 square mile area that included Miami-Dade College, Kendall Campus, from SW 104th Street to SW 88th Street and from SW 107th Avenue to SW 117th Avenue, Contact: Muhammed Hasan (305) 375-2030 1 9. RELEVANT PROJECTS STANDARD FORM 330 (62004) PAGE 2 Continuation Sheet 12, NAME E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.; 13. ROLE IN THIS CONTRACT Patrick Hayes, B.S.C.E. 15. FIRM NAME AND LOCATION (City and State) Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 16. EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE! Senior Field Engineer 14, YEARS EXPERIENCE a, TOTAL 321b WITH CURRENT FIRM 25 B,S,C,E, /1984/ Cornell University, Ithaca, New York 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards, etc.) A TSSA Worksite Safety Supervisor Final Estimates, ACI FOOT 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Central Island Drainage and Street Improvements PROFESSIONAL SERVICES i I~ONSTRUCTION (If applicable) City of Sunny Isles Beach 2008 Under Construction (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm a. Project Manager / Senior Field Inspector for the roadway rehabilitation and drainage system (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED SR 826 at NW 74th Street, South River Drive and Okeechobee Road PROFESSIONAL SERVICES II CONSTRUCTION (If applicable) FOOT 6 2003 2007 b. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc,) AND SPECIFIC ROLE l2SJ Check if project performed with current firm Project Administrator and Senior Field Inspector for this reconstruction project. Construction Cost $ 71 million 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 826 at NW 103rd Street, Reconstruction PROFESSIONAL SERVICESIICONSTRUCTION (If applicable) FDOT 6 1999 2003 c. (31 BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Project Administrator for this reconstruction project. His duties included the supervision of a very complex MOT scheme whereby the original speed limit has been maintained with no daytime lane closures allowed, Cost $ 39 millions (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 1-195/ SR 112 Bridge Widening from NE 1st Avenue to Biscayne Blvd, PROFESSIONAL SERVICES,ICONSTRUCTION (If applicable) FDOT 6 1997 1999 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm d. Senior Inspector/Assistant Project Engineer for this reconstruction project (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 395/MacArthur Causeway Reconstruction Project PROFESSIONAL SERVICES ~ICONSTRUCTION (If applicable) FOOT 6 1992 1993 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE 00 Check if project performed with current firm e. Bridge Construction Engineer/Field Inspector for this project and consisted of the construction of two 2500 ft, long parallel bridges with two-cell segmental superstructures, The project required complex traffic control ensuring all passengers and goods are able to enter the Port through this single entrance, Cost: $ 17 millions STANDARD FORM 330 (62004) PAGE 2 Continuation Sheet 12 NAME E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person,) 13, ROLE IN THIS CONTRACT George Sokola 15, FIRM NAME AND LOCATION (City and State) Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 16, EDUCATION IDEGREE AND SPECIALlZA TION) 17. Field Inspector 14, YEARS EXPERIENCE a, TOTAL 341b. WITH CURRENT FIRM23 CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) BS /1969/ Civil Engineering, Massachusetts Institute of Technology 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, etc.) ASBI Grouting Certiification 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Central Island Drainage and Street Improvements PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) City of Sunny Isles Beach 2008 - 2010 Present (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm a. Senior Field Inspector for the roadway rehabilitation and drainage system. Still in progress, (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 1-75/1-595 Interchange PROFESSIONAL SERVICES i lCONSTRUCTION (If applicable) FOOT District 4 2005 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE lXJ Check if project performed with current firm b. Field Engineer for the segmental bridges rehabilitation, Comprehensive Inspection and detailed records were required for this project. Cost $248,983 (11 TITLE AND LOCATION (City and State) (2) YEAR COMPLETED VA (Veterans Administration Hospital) - New Offices and Warehouse Building PROFESSIONAL SERVICES i ICONSTRUCTION (If applicable) West Palm Beach, FL 2005 2006 (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm c. Construction Manager for this Design-Build Hybrid project. One-story office/warehouse building with 10,000 sf + parking lot, loading areas and landscaping. Total Cost $1, 3M, (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Norona Limited, LLC Office Building PROFESSIONAL SERVICES i ICONSTRUCTION (If applicable) Sunrise, FL 2004 2005 (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc,) AND SPECIFIC ROLE l2SJ Check if project performed with current firm d. Construction Manager - For this Design-Build project. Five-story Office Building, 75,000 sf of construction + 300 parking spaces parking lot and landscaping. Cost $8M, (1) TITLE AND LOCATION (City and State) (21 YEAR COMPLETED Port of Miami Bridge PROFESSIONAL SERVICES ~ICONSTRUCTION (If applicable) Port of Miami 1992 1996 (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm e. Senior Bridge Inspector for the construction of this segmental bridge, Casting yard and construction site CEI services. The overall bridge length is 2,522 feet with 65 feet vertical clearance, Total Construction Cost: $ 39 M ST ANDARD FORM 330 16 2004) PAGE 2 Continuation Sheet 12. NAME E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person,) 13. ROLE IN THIS CONTRACT Raul Rakela, R.A. + NeARS Architect of Record / QC + QA 14. YEARS EXPERIENCE a, TOTAL 231b. WITH CURRENT FIRM 19 15, FIRM NAME AND LOCATION (City and State! Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 16, EDUCATION (DEGREE AND SPECIALlZA TlON! 17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE! BS /1983/ Architecture & Planning, Central University, Quito, Ecuador Thesis 1,- RA/ 14759/ State of Florida in Architectural & Urban Study for Health Care Centers at a Regional Level 2.- RN 104130/ State of Tennessee 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards. etc.! BIM (Building Information & Modeling) Specialist General Contractor in the State of Florida Council of Architectural Registration Boards - www,rakelanet 1 9. RELEVANT PROJECTS National (1) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED Newport Fishing Pier PROFESSIONAL SERVICESl!CONSTRUCTION (If applicable! City of Sunny Isles Beach 2010 a. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.! AND SPECIFIC ROLE ~ Check if project performed with current firm Architect of Record for the Newport Fishing Pier replacement in the City of Sunny Isles. The new replacement pier incorporate methos to reduce damage from storms and increase reliablity and performance of the structure, The structure, restaurant and railing meet ADA requirements and some amenities for fishing activities. The total cost of the project is $4,5 M (1) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED Broward County Main Library - Interior Lobby Renovations PROFESSIONAL SERVICESllCONSTRUCTION (If applicable! Fort Lauderdale, Florida 2009 b. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc,! AND SPECIFIC ROLE lXJ Check if project performed with current firm Architect of Record for the Design of New Stairs and Escalators Replacement: Architecture, Structural & MEP, Cost: $ 0.7 million, (1) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED Norona Limited, LLC Office Building PROFESSIONAL SERVICESIICONSTRUCTION (If applicable! Sunrise, FL 2003 2005 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE ~ Check if project performed with current firm c. Architect of Record - For this Design-Build project. Five-story Office Building, 75,000 sf of construction + 300 parking spaces parking lot and landscaping, Cost $8M, (1) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED Department of Justice - New Headquarters PROFESSIONAL SERVICESilCONSTRUCTION (If applicable! Sunrise, FL 2005 2006 d. (3) BRIEF DESCRIPTION IBrief scope, size. cost. etc.! AND SPECIFIC ROLE ~ Check if project performed with current firm Architect of Record for this Design-Build High-Security project, 6,000 sf with a cost of $700,000, (1) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED Florida National College - New Parking Garage PROFESSIONAL SERVICES ~ICONSTRUCTION (If applicable! Hialeah, FL 2004 (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc,! AND SPECIFIC ROLE lXJ Check if project performed with current firm e. Architect of Record for this Five-story (two fioors to be built @ 2nd phase) Parking garage + 120,000 sf of construction - 400 parking spaces and landscaping with an approximate construction cost $5M STANDARD FORM 330 (62004) PAGE 2 Continuation Sheet 12, NAME E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13, ROLE IN THIS CONTRACT Andres Ramiro Sanchez, CGC 15, FIRM NAME AND LOCATION (City and State) Beiswenger, Hoch & Associates, Inc, 510 Shotgun Road, Suite 400, Sunrise, FL 33326 16, EDUCATION !DEGREE AND SPECIALlZA nON) 17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) Environmental Engineer / General Contractor / Field Inspector 14. YEARS EXPERIENCE a. TOTAL Ib, WITH CURRENT FIRM 271 8 AA in Pre-Engineering, Miami-Dade Community College, Miami, FL 1982 BS Environmental Engineering, University of Florida, Gainesville, FL 1985 Drilling Rig Supervisor Title - Conoco Inc, Houston, TX 1990 General Contractor License CGC1510667 - FL 2005 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards, etc,) 11l TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Vakharia Building Health Center PROFESSIONAL SERVICES)\CONSTRUCTION (If applicable) Plantation, FL 2008 2009 a. (3) BRIEF OESCRIPTION (Brief scope. size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm Project Manager / Field Superintendent on build-out project for the 11,000 SF of build-out and 2,000 SF of additional construction, Cost $1,3 M, 11l TITLE AND LOCATION (City and State) (2) YEAR COMPLETED U,S, Department of Transportation - South FL Offices PROFESSIONAL SERVICES)ICONSTRUCTION (If applicable) Sunrise, FL 2008 2009 13) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm b. Project Manager / Field Superintendent on build-out project - 2,300 SF of build-out. Cost $230,000, 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Jain Center Temple PROFESSIONAL SERVICESIICONSTRUCTION (If applicable) Weston, FL 2007 2008 c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Project Manager / Field Superintendent on build-out proect, which included detailed marble installation on walls and fioor, Cost $240,000, (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Concord Plaza Building / BHA & Bentley-GEOPAK New Headquarters PROFESSIONAL SERVICES! I CONSTRUCTION (If applicable) Sunrise, FL 2002 2007 (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm d. Field Superintendent on the (5) five story building construction project of 75,000 SF, Tilt-up walls were the heaviest-longest in the industry at the time, In charge of safety and quality control. Project Manager/Field Superintendent on 7 build-out projects inside this five story building, which included high security walls and electronic devices for the Department of Justice ($700,000) and the Department of Labor ($415,000). (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The City of Sunny Isles Beach - Golden Shores Drainage and Street Improvements PROFESSIONAL SERVICES 1\ CONSTRUCTION (If applicable) Sunny Isles Beach, FL 2001 2002 (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc.) AND SPECIFIC ROLE l.XJ Check if project performed with current firm e. Civil Engineering Inspector responsible for preparation of daily reports and monthly budget estimates, coordination with City Manager, General Contractor and Subcontractors, Flooding problems were solved in the neighborhood, Cost $3.5 M, 19. RELEVANT PROJECTS STANDARD FORM 330 (6 2004) PAGE 2 Continuation Sheet 12, NAME E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13. ROLE IN THIS CONTRACT Raul Rodriguez,PLS 15, FIRM NAME AND LOCATION ICity and State) Beiswenger, Hoch & Associates, Inc., 510 Shotgun Road, Suite 400, Sunrise, FL 33326 16. EDUCATION !DEGREE AND SPECIALlZA TION) 17, CURRENT PROFESSIONAL REGISTRATION ISTA TE AND DISCIPLINE) Land Surveyor 1 Right-of-Way Engineer 14, YEARS EXPERIENCE a, TOTAL I b. WITH CURRENT FIRM 50+1 41 B,S,C,E, Surveying /1954/ University of Havana, Havana, Cuba Profesional Land Surveyor - Florida 1970 - LS 2717 1S, OTHER PROFESSIONAL QUALIFICATIONS IPublications. Organizations. Training. Awalds. etc,) 19, RELEVANT PROJECTS (1) TITLE AND LOCATION ICity and State) (2) YEAR COMPLETED State Road 816 (Oakland Park Blvd). from Powerline Road to Bayvie Drive PROFESSIONAL SERVICES ICONSTRUCTION IIf applicable) Browrd County, FL, FDOT District 4 2004 - 2009 2009 a. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE ~ Check if project performed with current firm Professional Land Surveyor for this project. Riight-of-Way maps and survey, Contact: Nadir Rodrigues (954) 777-4385, Cost $1,164,000, (1) TITLE AND LOCATION ICity and State) (2) YEAR COMPLETED VA-Medical Center, New Offices & Warehouse PROFESSIONAL SERVICES ICONSTRUCTION Ilf applicable) West Palm Beach, FL 2005 - 2007 2007 b. (3) SRIEF DESCRIPTION IBrief scope. size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm Land Surveyor of the Office-Warehouse building the VA-Medical Center, which includes paving, grading, drainage, water and sewer, The paving included the design of parking areas of previous concrete as well as rigid pavment. Cost $1,318,755, (1) TITLE AND LOCATION ICity and State) (2) YEAR COMPLETED SR-80 1 Southern Blvd, from SR-7 to Florida's Turnpike in Palm Beach County PROFESSIONAL SERVICES IICONSTRUCTION IIf applicable) FDOT District 4 1999 2003 (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm c. Professional Land Surveyor for this project. Riight-of-Way maps and survey, Contact: Nadir Rodrigues (954) 777-4385, Cost $28 M, (1) TITLE AND LOCATION ICity and State) (2) YEAR COMPLETED 1-95/Davie Boulevard Interchange in Broward County PROFESSIONAL SERVICES ,ICONSTRUCTION IIf applicable) FDOT District 4 1989 1991 (3) BRIEF DESCRIPTION IBrief scope. size. cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm d. (1) TITLE AND LOCATION ICity and State) (2) YEAR COMPLETED Homestead Air Force Base General Services PROFESSIONAL SERVICES ICONSTRUCTION IIf applicable) Miami-Dade County (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm e. Boundary, topographic survey, STANDARD FORM 330 162004) PAGE 2 Continuation Sheet F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 20. EXAMPLE PROJECT KEY NUMBER 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If app)icable) Central Island Stormwater Project, City of Sunny Isles Beach, FL 23. PROJECT OWNER'S INFORMATION 2008 - Active a, PROJECT OWNER b, POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Sunny Isles Beach Rick Conner, P.E, 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 305-792-1928 Mid Section of the City - From 174th to 183rd Streets, between Collins Avenue and Dumbfoundling Bay (Intracoastal Waterway), Preliminary and final design of drainage system, street widening and pavement, including addition of cub and gutter, signing and marking, new street lighting and landscaping. The drainage system consists of a self sustained drainage system with 27 deep wlls, Complementary design services include aerial photogrametry and topographical restitution, geotechnical, signing and marking, and permit application with DERM and FDEP. Additional services include preparation of construction specifications, special provisions, letting of bids, evalution of proponents and recommendation for project award, Post design services include technical assistance during construction and construction engineering inspection, (CEI). 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Beiswenger, Hoch & Associates, Inc. Sunrise, Florida Engineering Design & CEI Services (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 3 Continuation Sheet F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20, EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21, TITLE AND LOCATION (City and State) 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2 Golden Shores Drainage & Street Improvements, Miami-Dade County 23. PROJECT OWNER'S INFORMATION 2002 - 2006 2006 a, PROJECT OWNER b, POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Sunny Isles Beach Rick Conner, P.E. 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 305-792-1928 Northern Section of the City - From NE 185th Street to the Lehman Causeway between Collins Avenue and Dumbfoundling Bay (Intracoastal Waterway). Preliminary and final design of drainage system, street widening and pavement. Over 9,000 If of storm sewer rehabilitation using epoxy resins and liners (CIPP), The sewer rehabilitation project was published on the July 2002 issue of the "Trench less magazine" as the largest US rehabilitation project using epoxy resins and polyester liners. Part of the drainage consists of a self sustained drainage system with 4 deep wells. Complementary design services include aerial photogrametry and topographical restitution, geotechnical, signig and marking, and permit application wit DERM and FDEP. Additional services include preparation of construction specifications, special provisions, letting of bids, evalution of proponents and recommendation for project award. Post design services include technical assistance during construction and Civil Engineering Inspection, (CEI). 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Beiswenger, Hoch & Associates, Inc, Sunrise, Florida Engineer of Record / CEI (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FI RM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6)2004) PAGE 3 Continuation Sheet F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 70 projects, if not specified. Complete one Section F for each project.) 21, TITLE AND LOCATION (City and State) 20, EXAMPLE PROJECT KEY NUMBER 3 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicablel FHWA Engineering Contract No.2, Boone & West Jefferson, North Carolina 23. PROJECT OWNER'S INFORMATION 2007 - 2012 I a. PROJECT OWNER lb. POINT OF CONTACT NAME Federal Highway Administration Jennifer Whelchel 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost) Ie. POINT OF CONTACT TELEPHONE NUMBER 1703-404-6321 Federal Highway Administration, Eastern Federal Lands Highway Division, Sterling, Virginia - 2 Projects which consisted of milling, surfacing & rehabilitation 13,3 miles & 19.1 miles of Blue Ridge Parkway, overlooks, parking areas development areas and access roads. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 11) FIRM NAME (2) FIRM LOCATION (City and State) a. Beiswenger, Hoch & Associates, Inc, Sunrise, Florida (1) FIRM NAME 12) FIRM LOCATION (City and State) b. (1) FIRM NAME 12) FIRM LOCATION (City and State) c. 11) FIRM NAME (2) FIRM LOCATION (City and State) d. 11) FIRM NAME (2) FIRM LOCATION (City and State) e. 11) FIRM NAME (2) FIRM LOCATION (City and State) f. (3) ROLE Engineering and Surveying (3) ROLE (3) ROLE (3) ROLE 13) ROLE 13) ROLE STANDARD FORM 330 (6/2004) PAGE 3 Continuation Sheet F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20, EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 4 21, TiTlE AND LOCATION (City and State) 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Professional Architectural and Engineering Consultant for Broward County, FL 23. PROJECT OWNER'S INFORMATION 2006 - 2010 a, PROJECT OWNER b, POINT OF CONTACT NAME c, POINT OF CONTACT TELEPHONE NUMBER Broward County Sue Goldstein 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost) 954-357-6419 Providing AlE Services for vertical construction projects, Work Authorizations (WA) are issued based on a specific scope of work. Nineteen WA's to date have been issued including design of NW 21 Ave pedestrian bridge over C-13 canal. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Beiswenger, Hoch & Associates, Inc, Sunrise, Florida AlE Services (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 3 Continuation Sheet F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 5 21, TITLE AND LOCATION (Cily and State) 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Dade County Mise, Bridges Services, Miami-Dade County 23. PROJECT OWNER'S INFORMATION 2009 a, PROJECT OWNER b. POINT OF CONTACT NAME c, POINT OF CONTACT TELEPHONE NUMBER Miami-Dade County Public Works Department Miguel Riera 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 305-375-5820 Authorizations to perform professional engineering services were issued to include: - Design and construction plans preparation for minor bridge or other structural projects. - Update and modification of previously designed projects to conform with current requirements criteria, and standards. - Investigate the structural integrity of bridges, culverts, causeways and other structural facilities. - Inspect work in any phase of construction. - Review structural engineering designs, shopdrawing, calculations, studies or plans developed by other on behalf of the County. - Obtain any necessary permits. A total of 12 WorkAuthorizations were issued. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Beiswenger, Hoch & Associates, Inc. Sunrise, Florida Design Engineering (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 3 Continuation Sheet F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT {Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.] 21, TITLE AND LOCATION (City and State) 20, EXAMPLE PROJECT KEY NUMBER 6 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Districtwide Constructability Review, Miami-Dade County, District 6 23. PROJECT OWNER'S INFORMATION 2008 a, PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Florida DOT - District 6 Mikhail Dubrovsky 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost) 305-499-2354 Constructability/ Biddability reviews were performed for various phases of design as stated in the Task Authorization. This review included design, environmental issues, permitting; righ tof way utility coordination; joint project agreements, maintenance of traffic and construction methods and procedures. Reviews also involved a field visit, notation of special environmental or job-site conditions and a thorough review of plans, specificaitons, contract documents and bit items. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Beiswenger, Hoch & Associates, Inc. Sunrise, Florida Constructability / Biddability Reviews (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME 12) FIRM LOCATION (City and State) (3) ROLE c. 11l FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. 11l FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004l PAGE 3 Continuation Sheet F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21, TITLE AND LOCATION (City and State) 20. EXAMPLE PROJECT KEY NUMBER 7 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION ((f applicable) Town of Davie Engineering Services 2008 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b, POINT OF CONTACT NAME c, POINT OF CONTACT TELEPHONE NUMBER Town of Davie Mike Scott 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost! 954-797-1243 Provided Professional services for structural engineering assignments on projects that do not exceed $1,000,000 in basic construction cost or $50,000 for planning or engieering. Assignment to date involves bridge inspection services located at Robbins Lodge Park. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Beiswenger, Hoch & Associates, Inc. Sunrise, Florida Structural Engineering I Inspection (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6(2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20, EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21, TITLE AND LOCATION (City and Statel 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicablel 8 Concorde Plaza Building Operations, Sunrise, Florida 23. PROJECT OWNER'S INFORMATION 2002 - 2009 2002 - 2009 a, PROJECT OWNER b. POINT OF CONTACT NAME c, POINT OF CONTACT TELEPHONE NUMBER Norona Limited, LLC Gabriel Norona 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost) 954-334-9000 1) Architect of Record for Site Design, Architectural Design, Civil Design and Drainage Engineering, Construction Documents and Construction Supervision for 5 Story Tilt-up Building 75,000 SF Cost: $8.0 M, 2) Bentley Systems Headquarters, Sunrise, FL (2003 - 2005) - Architect of Record for the Design and Construction Documents for 12,000 S.F. Office Space, Architecture, MEP + Fire, Cost: $960,000. 3) U.S, Department of Justice, Sunrise, FL (2006) - Architect of Record for this tenant Design-Build and Construction Documents for 6,200 SF Office Space. Architecture, MEP + Fire. Cost: $715,000, 4) CIT Group Headquarters, Sunrise, FL (2007) - Architect of Record Design-Build and Construction Documents for 4,000 SF office Space. Architecture, MEP + Fire. Cost: $280,000. 5) State Executives, Sunrise, FL (2007) - Architect of Record for Interior Design, Construction Documents and Construction Supervision for 1,340 SF Office Space. Cost: $160,000, 6) U,S. Department of Transportation, Sunrise, FL (2009) - Architect of Record for this tenant Design-Build and Construction Documents for 2,300 SF Office Space, Architecture, MmEP + Fire. Cost: $230,000. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and Statel (3) ROLE a. Beiswenger, Hoch & Associates, Inc, Sunrise, Florida Architect of Record (1) FIRM NAME (2) FIRM LOCATION (City and Statel (3) ROLE b. Delta G. Consulting Engineers, Inc. Fort Lauderdale, FL MEP + Fire (1) FIRM NAME (2) FIRM LOCATION (City and Statel (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and Statel (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and Statel (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and Statel (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 3 Continuation Sheet F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21, TITLE AND LOCATION (City and State) 20, EXAMPLE PROJECT KEY NUMBER 9 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Miami-Dade County Survey Contract 2010-2012 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b, POINT OF CONTACT NAME c, POINT OF CONTACT TELEPHONE NUMBER Miami-Dade County Public Works Department Luis Lacau 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 305-375-2714 Providing professional land surveyor (PLS) services on projects as authorized by Miami-Dade County Public Works Department. The survey projects assigned could be for any County Department. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Beiswenger, Hoch & Associates, Inc. Sunrise, Florida Serveying (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 3 Continuation Sheet G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing PERSONNEL CONTRACT table. Place "X" under project key number for (From Section E, (From Section E, participation in same or similar role.) Block 12) Block 13) 1 2 3 4 5 6 7 8 9 10 Robert B. Deuser Contact Person X X X X X X ManuelR. Sanchez, PE OAlOC - Structural Engineer X X X Delio Perez, PE Senior Structural Engineer X X X Soheila Sadough, PhD, PE Senior Structural Engineer X Joseph Rojas, MSCE Senior Highway Engineer X X X X Rina Mariela Cuba, PE Highway Engineer X Manuel Vega, PE Senior Drainage Engineer X X Flex Cebrecos, MS Transportation PlannerlTraffic Eng. X X X X Patrick Hayes Field Engineer X X George Sokola Field Inspector Engineer X X X X X Andres Sanchez, CGC General Contractor/Inspector X X Raul Rakela, RA + NCARB Chief Architect X Raul Rodriguez, PLS Land Surveyor/ROW Engineer X X X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. 6 TITLE OF EXAMPLE PROJECT (FROM SECTION F) Central Island Stormwater Project Districtwide Constructability Review 2 Golden Shores Drainage & Street Improvements 7 Town of Davie Engineering Services 3 FHWA Engineering Contract No.2 8 Concorde Plaza Building Operations 4 Professional Architectural and Engineering Consultant 9 Miami-Dade County Survey Contract 5 10 STANDARD FORM 330 (6/2004) PAGE 4 H. ADDITIONAL INFORMATION 30, PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY, ATTACH ADDITIONAL SHEETS AS NEEDED, I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. ',",'GNAT"", I?u /3. y~ 33. NAME AND TITLE Robert B. Deuser, Vice President 32, DATE May 25, 2010 STANDARD FORM 330 (6/2004) PAGE 5 1, SOLICIT A TION NUMBER (If any! ARCHITECT-ENGINEER QUALIFICATIONS 2a. FIRM (OR BRANCH OFFICE) NAME 3, YEAR EST ABLlSHED I;' DUNS NUMBER Beiswenger, Hoch & Associates, Inc. 195507-387-9595 2b, STREET 5. OWNERSHIP 510 Shotgun Road, Suite 400 a. TYPE 2c, CITY 112d, STATE j2e, ZIP CODE Corporation Sunrise FL 33326 b. SMALL BUSINESS STATUS 6a, POINT OF CONTACT NAME AND TITLE No 7, NAME OF FIRM (If block 2a is a branch office! Robert 8, Deuser, Vice President 6b, TELEPHONE NUMBER 16C, E-MAIL ADDRESS 954-334-2752 bobd~bh aen!li neers. com N/A Ba. FORMER FIRM NAME(S) (If any) 8b, YR. ESTABLISHED Bc, DUNS NUMBER N/A N/A N/A 9. EMPLOYEES BY DISCIPLINE 10, PROFILE OF FIRM'S EXPERIENCE AND ANNUAL A VERAGE REVENUE FOR LAST 5 YEARS a, Function c, No, of Employees a, Profile c. Revenue Index b, Discipline b. Experience Number Code (1) FIRM (2) BRANCH Code (see below) 02 Administrative 6 B02 Bridges 6 06 Architects 5 C15 Construction Management 2 08 CADD Technicians 5 C16 Construction Surveying 1 12 Civil Engineer 12 GOl Garages, Parking Decks 1 15 Construction Inspector 7 H07 Highways 6 16 Construction Manager 2 L02 Land Surveying 1 18 Cost Engineer/Estimator 1 001 Office Buildings 6 38 Land Surveyor 6 P06 Planning (site and project) 2 57 Structural Engineer 7 T03 Traffic and Transportation Engineering 4 60 Transportation Engineer 5 W01 Warehouse and Depots 1 Other Employees Total 56 11, ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM FOR LAST 3 YEARS 1. Less than $100.000 6. $2 million to less than $5 million (Insert revenue index number shown at right) 2. $100,00 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 3 3. $250.000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work 7 4. $500.000 to less than $1 million 9. $25 million to less than $50 million c. Total Work 7 5, $1 million to less than $2 million 10. $ 50 million or greater RFQ # 10-04-01 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) a, SIGNATURE ~r:U.15 9~ c, NAME AND TITLE Robert 8, Deuser, Vice President AUTHORIZED FOR LOCAL REPRODUCTION 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. Ib' DATE May 25, 2010 STANDARD FORM 330 (6/2004) PAGE 6