Loading...
HomeMy WebLinkAboutCalvin Giordano & Assoc. #5 C:;J6 \ f Calvin, Giordano & Associates, Inc. ~~ J E X C E P T ION A l SOL UTI 0 ~ ; . Original RECEIVED MAY 2 ~1~p~r7("^ tlTY OF SUNNY ;C;:'i_~rH SUNNY ISLES BEACH PROFESSIONAL ENGINEERIN<9~9WIICES"(' r.:. Calvin Giordano & Associates, Inc. - A Highly Qualified and Responsive Consultant This is Why You Select Calvin Giordano For a number of years, Calvin Giordano & Associates, Inc. (CGA) has the honor of currently providing professional consulting services to the City of Sunny Isles Beach. It is our intent to continue and build upon that relationship by providing enhanced responsiveness on any and all projects and issues presented by the City. Douglas Taylor, PE will act as project manager, and client contact for all projects and tasks resulting from this contract. Mr. Taylor has over 26 years of experience in dealing with civil engineering projects. For 20 of those years, he has served as a project manager on projects that have included engineering, surveying, landscape architecture, planning, and construction management. In addition, for the past 17 years he has managed offices, departments, and divisions, and served as primary client contact for many public clients. PRIMARY CONTACT/PROJECT MANAGER Douglas Taylor, PE, (954) 921-7781 dtaylo r@calvin-giordano.com CGA is a multi-disciplinary firm that has been located in South Florida for over seventy (70) years. The company has grown from a small, two-person surveying firm to approximately two hundred (200) employees, providing a broad range of services, including civil & electrical engineering, landscape architecture, planning, surveying, geographic information systems (GIS), transportation engineering, environmental services, construction management, indoor air quality, and emergency management. Since its inception, CGA has served as a professional consultant to various municipalities throughout South Florida, including the Cities of, Sunny Isles Beach, Dania Beach, North Lauderdale, North Miami Beach, Pembroke Pines, Riviera Beach, Surfside, Bay Harbor Islands and Weston, many of which have been repeated clients for more than ten (10) years. If selected, CGA's Fort Lauderdale office located at 1800 Eller Drive, Suite 600, Fort Lauderdale, Florida 33316 will be the responsible office for this contract. Based on the RFQ, CGA proposes to perfD rm the following civil engineering related tasks for the City of Sunny Isles Beach: General civil design work, creation of construction contract plans and special provisions, post design services, bid administration, constructio n management, construction inspection, traffic, electrical, biological resources environmental, hurricane recovery and debris monitoring, landscape architecture, survey, and public involvement. The following is a basic overview of these services as they relate to Calvin Giordano & Associates GENERAL CIVIL DESIGN (ROADWAY, DRAINAGE, UTILITIES) Calvin Giordano and Associates, Inc. (CGA) has provided general civil engineering consulting services to municipalities such as the cities of Sunny Isles Beach, Miramar, Miami Beach, Weston, North Miami, Pembroke Pines, Dania Beach, North (~6 \ ..f Calvin, Giordano & Associates, Inc. Q~JEXCEPTIONAl SOlUTIO~; . Lauderdale, North Miami Beach, West Park, the Towns of Bay Harbor Islands, Davie, and Surfside. CGA's roadway design experience ranges from small, minor roadway modifications to large multi-lane highways and interstates. In addition, CGA designs, coordinates, and permits new utilities and utility relocations in a number of municipalities. CGA's drainage experience includes acting as District Drainage Engineer to the Indian Trace Community Development District and the Bonaventure Development District, and the South Broward Drainage District, as well as creating many stormwater master plans and other drainage projects. CGA's broad range of roadway design and drainage services includes: · Route surveys, Right-of-Way mapping, topographical surveys, boundary surveys, specific purpose surveys, and soft dig locates · Re-design and permitting of existing roadways in redevelopment areas · Design of arterial, collector, and local roads including public involvement · Design and modeling of drainage basins · Securing of grants for varying types of municipal projects · New utility and utility relocation design and permitting · Drainage design for roadway projects · Stormwater Master Plans · Drainage permitting through DERM, and DEP (wells) · Intergovernmental agency coordination · Roadway design including resurfacing, rehabilitation, widening, turn lane additions, median and sidewalk additions/removals, traffic calming, paving, drainage, and parking studies · NPDES studies, plans, & permitting · Street lighting design · Maintenance of Traffic (MOT) plans · Major & minor drainage design and permitting TRAFFIC AND TRANSPORTATION ENGINEERING From experience in managing Florida Department of Transportation (FDOT), municipal and private- sector transportation projects, CGA has developed a unique and successful approach that integrates "agency" and "private-sector" perspectives. This approach has proven to be mutually beneficial for public and private sector clients allowing projects to proceed more efficiently. CGA is qualified to assist with a broad range of technical and regulatory tasks including comprehensive planning, concurrency, intergovernmental coordination, traffic operations, multi-modal activities, and site-specific traffic impact review. CGA is currently providing general transportation planning consultant services to the FDOT District IV as well as the St. Lucie Transportation Planning Organization. The firm also provides municipal transportation services to the cities and towns of Miramar, Homestead, Greenacres, Parkland, Surfside, Weston, and West Park. Consulting services provided municipalities include: · Traffic forecasting design/major roadway improvements assessment · Regional transportation travel demand modeling · Corridor studies · Comprehensive traffic studies · Interchange Modification Reports · Project Development & Environment (PD & E) studies · Pavement marking and signage plans · FDOT Local Agency Program projects · Real-time traffic simulation modeling including "driver's eye" perspectives · Emergency evacuation studies and planning. · Roadway capacity analysis · Project implementation and funding source identification · Municipal traffic review of site plans and land development applications · Traffic signal warrant studies/signal design (:26\ f Calvin. Giordano ~ Associates, Inc. lfJEXCEPTIONAl SOlUTIO~; . · Traffic safety studies and school zone considerations · "Traffic calming" and neighborhood traffic intrusion studies · Transportation grants applications. · Comprehensive traffic planning · Intergovernmental agency coordination and representation CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES CGA has an outstanding in-house Construction Management (Construction Administration and Construction Inspection) team with the training, certifications, and experience to handle any roadway, bridge, building, park or utility construction project for the City of Sunny Isles Beach including but not limited to: City facilities, urban roadway reconstruction, widening or resurfacing, utility relocation, fixed and movable bridges, drainage, lighting and signalization, as well as landscape installation/relocation inspection and maintenance monitoring services. In addition, our team possesses the expertise to assist the City of Sunny Isles Beach with numerous specialized construction services such as constructability reviews, traffic control plan analysis, environmental services, public information, survey, utility coordination, schedule and claims analysis, innovative contracting method recommendations, value engineering proposals, and innovative, project-specific special provision development to address unique technical or administrative aspects of a project. ELECTRICAL ENGINEERING The CGA Electrical Department has broad capabilities for the infrastructure and the end use development for commercial, industrial and municipal projects. The types of services we provide include: · Power distribution · Interior lighting · Area lighting · Roadway lighting · Sports field lighting · Communication systems distribution · Energy Conservation BIOLOGICAL ENVIRONMENTAL SERVICES We know from experience that a project's success depends on negotiating a maze of environmental regulations complicating the path from site selection through design to completion. Environmental rules and regulations are dynamic, constantly changing, so as consultants, we keep abreast of changes, giving clients insight and creative solutions to keep their projects moving ahead smoothly. Our success is based on work experience and established relationships with field representatives from governmental agencies. For example, we have processed more than 100 dredge-and-fill applications for roadway projects to developments with regional impacts. The environmental staff routinely coordinates details with municipalities, developers, design engineers, surveyors, as well as governm ental agency representatives. It is our goal to obtain reasonable, environmentally sensible solutions for our clients. HURRICANE RECOVERY AND DEBRIS MONITORING The Emergency Management Services Division offers local governments and businesses comprehensive emergency management planning, mitigation, training, exercise and regulatory compliance services. CGA is an innovative consulting firm with an extensive history of providing contractual government services for cities throughout South Florida. Our longstanding municipal partnerships and government experience enables CGA to offer a comprehensive package of contracting services to local governments of which public safety is a vital component. Our experienced emergency managers, planners, public . (Q~\ I Calvin, Giordano & Associates, Inc. ~JEXCEPTIONAl SOlUTIO~; . . administrators, engineers, public utility specialists, and information technology staff can pool their talents to comprehensively address the full-range of disaster preparedness, response, and recovery needs of your organization. Enhance Preparedness through planning, training, and exercises - Facilitate the development of strategies, plans and organizational structures to respond to any disaster and restore your community. · Comprehensive Emergency Management Plans · Evacuation and Shelter Plans · Exercise and Corrective Action Program with HSEEP Compliance · Long Term Recovery Plan and Post Disaster Redevelopment · Continuity of Operations and Business Continuity Plans · Debris Monitoring Planning · Resource Analysis and resource Management Plans · Human Resource and Responder Family Plans LANDSCAPE ARCHITECTURE The landscape architecture department has a unique blend of qualified professionals that provide a plethora of interests and personal expertise as an underlay to their Landscape Architectural professions. They are educators, community leaders, activists, volunteers, artists, architects, sculptors and LEED Accredited Professionals. This mix of talent allows us to provide our Clients with holistic, well-rounded design solutions that, beyond considering all the functional and implementation issues needed to be resolved, ensure a design product that, once built, will provide for longevity, experience, value and unique identities necessary to establish community branding and buy-in. Our staff counts on registered landscape architects with more than sixty (60) years of collective professional experience, supported by a strong team of experts. A sample of services includes: · Hardscape, landscape, & irrigation · Streetscape · Urban revitalization · Public involvement · Grant application preparation & processing . Graphics · Feasibility studies SURVEY & MAPPING The Surveying and Mapping Division offers the services, staff and technology to ensure that every survey project is executed successfully, and to our clients' satisfactions. CGA provides boundary surveys, topographic surveys, route surveys, GPS surveys, As-built surveys, sub-surface utility location surveys, Right-of-Way mapping, infrastructure layout, platting services, etc... The Survey department maintains seven (7) field crews out of the Fort Lauderdale office which can be utilized for any projects for the City of Su nny Isles Beach. Our firm has nine (9) survey grade GPS systems available and we are capable of both static and RTK GPS surveying. CGA's six (6) professional surveyors (not including field crew) have nearly one hundred forty (140) years of collective surveying experience. In addition to Chapter 177, CGA's surveyors are familiar with Chapter 287.055, Chapter 472, Florida Statute, and 61G17, Florida Administrative Code. (?6. \ f Calvin, Giordano & Associates, Inc. Q~ I E X C E P T ION A l SOL UTI 0 ~ ; . I PRINCIPAL-IN-CHARGE Dennis J. Giordano Calvin, Giordano & Associates PROJECT MANAGER -- - Douglas Taylor, PE Calvin, Giordano & Associates I I TRAFFIC AND TRANSPORTATION ENGINEERING ---- Jeffery Maxwell, PE, PTOE GENERAL CIVIL ENGINEERING ~-~- Shaun Bamforth, PE, LEED AP John Messerian, PE Calvin, Giordano & Associates Calvin, Giordano & Associates I I BIOLOGICAL ENVIRONMENTAL SERVICES Sandra Lee, AICP, LEED AP ELECTRICAL -~ --- Robert Roush, PE Calvin, Giordano & Associates Calvin, Giordano & Associates I CONSTRUCTION ADMINISTRATION & INSPECTION Sabrina Baglieri Bruce Bernard Calvin, Giordano & Associates I EMERGENCY MANAGEMENT Helene Wetherington, AICP CEM Sabrina Baglieri Calvin, Giordano & Associates LANDSCAPE ARCHITECTURE Gianno Feoli, ASLA, AlA SURVEY & MAPPING Robert Jackson, PSM Calvin, Giordano & Associates Calvin, Giordano & Associates (:26\ f Calvin, Giordano & Associates, Inc. ~IEXCEPTIONAl SOlUTIO~; . PROJECT 2006/2007 Broward Beautiful Community Grant Program Median Enhancement West Park, FL 92nd Street Park Development and Construction Documents Bay Harbor Islands, FL A-1-A Bike Lanes - Jupiter, FL Aqua Isles Development Dania Beach, FL Atlantic Isles Utility & Roadway Improvements Sunny Isles Beach, FL Broad Causeway Toll Plaza Miami-Dade County, FL Cannonsport Condominiums and Marina Palm Beach Shores, FL Capital Improvements Program Weston, FL Capital Improvements Program Sunny Isles Beach, FL Community Development Services West Park, FL Community Enhancement Project Phase II Bay Harbor Islands, FL Debris Management Plan Seminole Tribe of Florida Doral Streets cape Beautification Master Plan Doral, FL EAR-Based Amendments Parkland, Florida Electrical Design of 700 Block of Foresteria Drive Lake Park, FL FDOT DISTRICT IV General Transportation Planning Services - FL FDOT 1-95 Landscape Redevelopment Project Broward County, FL GIS Mapping Internet Application - Sunny Isles Beach,FL Hiatus Road - Pembroke Pines, FL 1-595 PPP Express Lane Project Fort Lauderdale, FL OWNER NAME & PHONE NUMBER Russell Benford, West Park City Administrator, (954) 989-2688 Ronald J. Wasson, Town Manager (305) 866-6241 Thomas Driscoll, Jupiter (561) 741-2215 James Carr, CEO (305) 666-4900 Rick Conner, P.E. , City Manager (305) 792-1928 Randy Daniel (305) 866-6241 Jim Rost (614) 857-2330 John Flint, City Manager (954) 385-2000 Rick Conner, P.E. , City Manager (305) 792-1928 Russell Benford, West Park City Administrator, (954) 989-2688 Ron Wasson, Town Manager (305) 866-6241 Jason Dobronz, Emergency Mgmt Planner, (954) 894-1070 x.I0911 Yvonne Soler-McKinley, City Manager (305) 593-6725 Roberta Moore, Planning Director (954) 753-5040 Richard Pittman (561) 881-3347 Chon Wong, Proj. Mgr., FDOT, District IV, (954) 7774659 Nelson Perez, Proj. Coord. FDOT District IV, (954) 486-1400 Rick Conner P.E. , City Manager 305-792-1928 Joseph McLaughlin, P.E., City Engineer (954) 435-6511 1-595 Express LLC, (954) 513-3200 APPROX. COM PL. DATE (OR EST.) 2007 2009 2007 2008 2009 2007 2006 2009 2009-2010 2005 2009 2008 2006 2008 2009 2009 2009 2009 2006 2009 (GJA \ I Calvin, Giordano & Associates, Inc. \S}J'0JEXCEPTIONAl SOlUTIO~; . PROJECT I-75/Alligator Alley - FDOT Indian Trace Boulevard at Saddle Club Road Signal, Weston, FL Lake Shore Drive Drainage Improvements Lake Park, FL Land Development Planning Services Surfside, FL Land Development Services Weston, FL Lift Station No. 12 Rehabilitation North Lauderdale, FL Landscape Architecture Services Bay Harbor Islands, FL Long-Term Planning, Landscape Architecture, Environmental and Civil Eng. Services Weston, FL Manatee Isles Drive Roadway Improvements Weston, FL Marlin Bay Yacht Club and Marina Project Marathon, FL Master Lift Station 19 Rehabilitation Davie, FL Memorial Healthcare System Broward County, FL Midway Road Improvements St. Lucie County, FL Midway Road PD & E Study St. Lucie County, FL NE 172nd Street & North Bay Road Improvements, Sunny Isles Beach, FL NE Quadrant Drainage Study HaIIandale Beach, FL North Shore Improvements Miami Beach, FL Northwest Dade Community Urban Redevelopment Charrette, Miami-Dade County, FL City Emergency Planning Osceola County, FL OWNER NAME & PHONE NUMBER Mr. Ronald Wallace, P.E., FDOT District IV, (954) 777-4641 John Flint, City Manager (954) 385-2000 Maria Davis, Town Manager (561) 881-3300 Gary Word, Town Manager (305) 993-1052 John Flint, City Manager (954) 385-2000 Mike Shields, Public Works Director (954) 724-7039 Ron Wasson, Town Manager (305) 866-6241 John Flint, City Manager (954) 385-2000 John Flint, City Manager (954) 385-2000 Eugene Spano(786) 552-7233 Bruce Taylor, Utility Director (954) 327-3741 Joseph G. Alcure, Jr., Director, Const. Dept., (954) 433-7184 Mike Harvey, (772) 462-1707 Craig Hauschild, (772) 462-1707 Rick Conner P.E., City Manager (305) 792-1928 Rick Labinsky, City Engineer (954) 457-1620 Miguel Perez, (305) 673-7071 Marta Fleites, (305) 375-2842 ext. 2560 Dave Casto, County Emergency Mgmt. Dir., (407) 742-9000 APPROX. COMPL. DATE (OR EST.) 2008 2008 2009-2010 2010 2009 2009-2010 2005 2009 2009-2010 2008 2005 2009 2009 2009 2007-2009 2009-2010 2009 2007 2009 (t4. \ f Calvin, Giordano ~ Associates, Ino. \3)\..)JEXCEPTIONAl SOlUTIO~; . PROJECT Palm Avenue Pembroke Pines, FL Paloma Lakes Coconut Creek, FL Pembroke Pines Public Services Campus Pembroke Pines, FL Pembroke Harbor Broward County, FL Pines Boulevards / 1-75 Ramps FDOT, District IV Pines Boulevard Pembroke Pines, FL Pines Boulevard at Hiatus Road Pembroke Pines, FL Planning, Engineering, and Landscape Architecture Services Surfside, FL S.R. AlA at NE 175th Median Closure Study Sunny Isles, FL Shops at Pembroke Gardens (Parking Facility Design), Pembroke Pines, FL South Pennock Lane Improvements Jupiter, FL Stormwater Improvements (GPS Application for catch Basin Infrastructure), West Park, FL Storm water Management Lauderhill, FL Stormwater Management North Lauderdale, FL Stormwater Master Plan - Bonaventure Development District, Weston, FL Stormwater Master Plan Dania Beach, FL Stormwater Master Plan South Broward Drainage District (SBDD), FL Stormwater Master Plan Surfside, FL Stormwater Master Plan- Basins S-9 & S-lO South Broward Drainage District (SBDD), FL OWNER NAME & PHONE NUMBER Joseph McLaughlin, P.E., City Engineer (954) 435-6511 Wood Partners (561) 893-0094 Martin Gayeski, Assistant City Manager (954) 437-11116 James Carr, (305) 666-4900 Mr. Joe Najarian, P.E., Proj. Mgr. District IV, (954) 777-4682 Joseph McLaughlin, P.E., City Engineer (954) 435-6511 Joseph McLaughlin, P.E., City Engineer (954) 435-6511 Gary L. Word, Town Manager (305) 861-4863 Rick Conner, PE , City Manager (305) 792-1928 Randy Burke, Duke Realty (317) 808-6339 Thomas Driscoll, Jupiter (561) 741-2215 Russell Benford, West Park City Administrator, (954) 989-2688 Charles Faranda, City Manager (954) 730-3000 Ambreen Bhatty, Interim City Manager (954) 724-7041 John R. Flint, City Manager (954) 385-2000 Dominic Orlando, Public Services Director, (954) 924-3740 Leo Schwartzberg A.I.c.P. P.E., District Director, (954) 6803337 Gary L. Word, Town Manager (305) 861-4863 Leo Schwartzberg A.I.c.P. P.E., District Director, (954) 6803337 APPROX. COMPL. DATE (OR EST.) 2006 2008 2009 2009 2008 2006 2006 2009 2009 2008 2009 2009 2009 2009 2009 2009 2010 2009 2009 (c;)6 \ f Calvin, Giordano & Associates, Inc. ~~ J E X C E P T ION A l SOL U r I 0 ~ ' . PROJECT SW 172nd Avenue Widening Pembroke Pines, FL SW 184th Avenue Widening Pembroke Pines, FL SW 196th Avenue Widening Pembroke Pines, FL SW Quadrant Drainage Study Hallandale Beach, FL Town of Surfside Planning, Engineering, and Landscape Architecture Services, Surfside, FL Traffic Consultant Services Homestead, FL Utility Master Plan Davie, FL Wastewater Treatment Plant Expansion, Phase III, Davie, FL Water and Sewer Rate Study North Lauderdale, FL Water Distribution and Wastewater Collection System Weston, FL Waterview Development Miramar, FL West Island Tot Lot Park Development and Construction Documents Bay Harbor Islands, FL Weston Capital Improvements Projects Weston, FL Weston Public Works Facility Weston, FL OWNER NAME & PHONE NUMBER Joseph McLaughlin, P.E., City Engineer (954) 435-6511 Joseph McLaughlin, P.E., City Engineer (954) 435-6511 Joseph McLaughlin, P.E., City Engineer (954) 435-6511 Rick Labinsky, City Engineer (954) 457-1620 Gary Word, Town Manager (305) 993-1052 Sergio Purinos, Director Development Services, (305) 224-4510 Bruce Taylor, Utility Director (954) 327-3746 Bruce Taylor, Utility Director 954327-3741 Mike Shields, Public Works Director (954) 724-7039 John Flint, City Manager (954) 385-2000 Jim Carr (305) 666-4900 Ronald J. Wasson, Town Manager (305) 866-6241 John Flint, City Manager (954) 385-2000 John Flint, City Manager (954) 385-2000 APPROX. COMPL. DATE (OR EST.) 2006 2007 2009 2010 2010 2010 2007 2008 2005 2010 2009 2005 2009 2007 (~.Q.\ f Calvin, Giordano & Associates, Inc. Q)DJEXCEPTIONAl SOlUTIO~; . State of Florida Department of State I certify from the records of this office that CALVIN, GIORDANO & ASSOCIATES, INC. is a corporation organized under the laws of the State of Florida, filed on June 27, 1985. The document number of this corporation is M17373. I further certify that said corporation has paid all fees due this office through December 31, 2010, that its most recent annual report was filed on February 17, 2010, and its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of Florida. at Taffalra......ee. the Capital, thi... tire Eighteenth day of February. 2010 ~'.'6 Secretary of State AUlhentication ID: 600169257806-021810-MI7373 To authenticate this certilicate,visitthe following site, enter this ID. and then follow the instructions displayed. h ttps:/Iefi le.su n biz.org/certa u th ver. h tm I (~6\ f Calvin, Giordano & Associates. Inc. ~~ J E X C E P T ION A l SOL UTI (\ ~ ; . SUNNY ISLES BEACH PROFESSIONAL ENGINEERING SERVICES Calvin Giordano & Associates, Inc. - A Highly Qualified and Responsive Consultant FINANCIAL STATEMENT Since our beginnings in 1937, CGA and its predecessors have always proven to be financially solid companies, never having filed for bankruptcy nor heavily burdened by economic fluctuations. For your general information, the firm's gross revenues for the past seven (9) years have been: Because we are a private corporation, CGA does not disclose specifics of our financial statements. However, CGA has had a long- term banking relationship with Wachovia Bank. Mr. Thomas Weigel, VP Relationship Manager, can confirm our company's long standing financial stability and may be contacted at (954) 467-5137. Please feel free to contact him with any specific questions in verifying our financial stability. L~-- ~J 2001 $ 8,568,007 2002 $10,080,100 2003 $11,334,700 2004 $14,956,500 2005 $17,337,500 2006 $21,088,000 2007 $23,135,273 2008 $22,761,855 2009 $23,064,685 \YachOvie Ban)l, N..... Bu5lt'1en Banking Group fl6063 2500 ,^~.ton Rood Weston. Fl 33331 . WACHOVIA March 8, 20 I 0 Mr. Dennis Giordano Calvin, Giordano & Associates, Inc. 1800 Eller Drive, STE 600 Ft. Lauderdale, FL 33316 Dear Dennis: Calvin, Giordano & Associates, Inc. has been a valued customer of Wachovia Bank, N.A. since 1988. The Finn's average 12 month depository balances arc in the low seven figure range. All depository accounts have always been handled as agreed, and we appreciate your business. If you have a client that would like to speak with me about the Finn's Business Banking relationship, please give them my name and direct telephone number. #954-467-5141. I would ask that you please notifY me prior to anyone calling, as we typically do not discuss client relationships on the telephone. We value your relationship and thank you for banking with. Wachovia Si~, /7 ~ Vice President Premier Relationship Manager Business Banking Group TPW/sca STANDARD FORM 330 ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) PROFESSIONAL ENGINEERING SERVICES 2. PUBLIC NOTICE DATE MAY 26, 2010 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE DENNIS J. GIORDANO -PRESIDENT 5. NAME OF FIRM CALVIN, GIORDANO & ASSOCIATES, INC. 6. TELEPHONE NUMBER 7. FAX NUMBER (954) 921-7781 (954) 921-8807 C. PROPOSED TEAM 3. SOLICITATION OR PROJECT NUMBER RFQ# 10-04-01 iordano.com rComvlete this section or the vrime contractor and all key subcontractors.] (Check] e>:: 0 e>:: E- u "'-l "'-l ;:2 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT ::E >z 0:: oE- E- -ex: z P- <( 0 P- U co ~ V) Calvin, Giordano & 1800 Eller Drive, Suite 600 Engineering and Associates, Inc. Fort Lauderdale, FL 33316 Management Services a. X o CHECK IF BRANCH OFFICE b. o CHECK IF BRANCH OFFICE C. o CHECK IF BRANCH OFFICE d. o CHECK IF BRANCH OFFICE e. o CHECK IF BRANCH OFFICE f. o CHECK IF BRANCH OFFICE E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Comv/ete one Section E for each ket verson. ) 26 14. YEARS EXPERIENCE I b. WITH CURRENT ~IRM 12 NAME DOUGLAS R. TAYLOR, PE \3 ROLE IN TillS CONTRACT Project Manager a TOTAL 15. FIRM NAME AND LOCATION (City and State) Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL 16 EDUCATION (DfXiREE AND SPH'IAUZAllON) BS Civil Engineering, University of Illinois (UIDe), 1984 17. CURRENT PROFESSIONAL REGISTRATION (STA IE AND f)JSClPUNI,j 1988 (State of Illinois), 1996 State of Florida 18 OTHER PROFESSIONAL QUALlFlCA liONS (Puhlicaliolls, Organizations, Training, Award\', etc.) Mr. Taylor has been responsible for a multitude of municipal engineering and development projects throughout Florida. This includes master design responsibility and oversight for a variety of projects. His goal is to instill within his group the importance of diligent project manager-to-client communications, as well as project manager-agency communications. Another prime focus has been the strong project schedule management, allowing clients to focus on other matters of importance while remaining confident that their projects are in capable hands. Mr. Taylor has 26 years of experience in civil engineering and is a registered Professional Engineer in Florida, Colorado, Illinois, Iowa and Wisconsin. He has managed at a single time, as many as 25 design professionals within his office. In addition, he spent two years as a Vice President of Development for a major Florida retail developer. Mr. Taylor has performed a number of studies, design and permitting for roadway, and drainage on municipal, commercial, institutional, recreational, and industrial projects in Florida, and the Caribbean. (I) TITLE AND LOCATION (CIty and Stale) (2) YEAR COMPLETED Assistant City Engineer PROFESSIONAL SERVICES I CONSTRUCTION (if appheah/e) Weston, Florida 2008/Present (3) BRIEF DESCRIPTION (Rriefscope. size. eosl, ele) AND SPECIFIC ROLE 181 Check if project performed with current firm a. Responsible for Engineering DRC review, Engineering Construction Permits, and day to day engineering related issues for the City. In addition, manage larger projects dealing with roadways, drainage, water, and sewer for the City. (1) TITLE AND LOCATION (('I/yand Slate) (2) YEAR COMPLETED Site Plan and Engineering Permit Services for the City of West PROFESSIONAL SERVICES 1 CONSTRUCTION (if apphmh/e) Park, and City of Dania Beach. 2008/Present b. (3) BRIEF DESCRIPTION (Bnefseope, size. cost, ete) AND SPECIFIC ROLE o Check if project performed with current firm Site Plan review and development of reports for engineering aspects of Site Plan submittal packages, and attendance at DRC meetings as a City representative. Review and approval of Engineering Permits for construction. (1) TITLE AND LOCATION (CI/y and Slate) (2) YEAR COMPLETED City of Oakland Park, Community Redevelopment Area (CRA) PROFESSIONAL SERVICES 1 CONSTRUCTION (if appheah/e) Oakland Park, Florida 20042005 c. (3) BRIEF DESCRIPTION (Bmfscope, size, cost, elc) AND SPECIFIC ROLE o Check if project performed with current firm As consultant Project Director for the CRA, planned, coordinated, and managed all projects within the CRA with the CRA Director, City Manager, and City staff. (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED Griffin Road Expansion PROFESSIONAL SERVICES 1 CONSTRUCTION (if oppheable) West Palm Beach, Florida 2003 (3) BRIEF DESCRIPTION (Brief scope, si:e. cosl, elc) AND SPECIFIC ROLE o Check ifproject perfonned with current firm d. Engineer of record and Project Manager for the milling and resurfacing of two miles of highway and the addition of two lanes of new roadway to create a four lane section. This involved the addition of water quality improvements. 19 RELEVANT PROJECTS E. RESUMES OF KEY PERSONNEL PROPOSED FOR TillS CONTRACT Com lete one Section E for each ke 8 14 YEARS EXPERIEl'CE b. WITH CURRENT FIRM 1 12. NAME SHAUN BAMFORTH, PE, LEED AP 13. ROLE IN TillS CONTRACT Civil Engineering a TOTAL 15 FIRM NAME AND LOCATION (Cily alld Stale) Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL 16 EDUCATION (DECRf:f; AND SPEc/AUZA 710N) BS Civil Engineering-2003 Rensselaer Polytechnic Institute, Tro , NY 17. CURRENT PROFESSIONAL REGISTRATION (SIA IE AND lJISCIPUNf) Professional Engineer State of Florida No. 69115, LEED AP 18 OTHER PROFESSIONAL QUALIFICATIONS (Puhlications, Organizations, Training, Award\', euo.) Mr. Bamforth has more than 7 years of project engineering and management experience in or around the Fort Lauderdale area. He has served as project manager on a wide range of stormwater, potable water, wastewater, paving, grading, drainage and transportation projects. He has also served as Town Engineer and Lead Engineer for various municipalities in Broward County. (1) TITLE AND LOCATION (Clly alld Slale) (2) YEAR COMPLETED Stormwater Plan (SWMP) Update PROFESSIONAL SERVICES I CONSTRUCTION (if appbcah/e) Ft. Lauderdale/Hollywood International Airport, Florida 2007 (3) BRIEF DESCRIPTION (Bnefscope. size. cosl. elc.) AND SPECIFIC ROLE 181 Check ifproject performed with current firm a. . Served as Project Manager and Lead Engineer on 2000 acre Stormwater Master Plan . Developed design alternatives for review with Broward County Aviation Division . Managed engineers/interns along with multiple sub-consultants (I) TITLE AND LOCATION (( 'ily alld Slale) (2) YEAR COMPLETED Lauderdale By The Sea Town Engineer PROFESSIONAL SERVICES T CONSTRUCTION (ifappbcable) Lauderdale By the Sea, Florida 2007/2008 (3) BRIEF DESCRIPTION (Briefscope. .me. co.,I. elc.) AND SPECIFIC ROLE o Check if project performed with current firm . Served as primary client contact for Town Manager, Director of Municipal Services and Development Services b. . Managed more than $150,000 per year in engineering fees on a wide range of civil engineering, landscaping and architectural design projects. . Attended town commission meetings, provided recommendations and answered commissioners questions . Projects included: multiple stormwater designs, emergency forcemain repair, Town entryway features (flag poles), neighborhood entryway signs, traffic engineering reports, multiple engineering and planning reviews. (I) TITLE AND LOCATION (( 'ily alld Slale) (2) YEAR COMPLETED Highland Estates Roadway and Drainage Improvements PROFESSIONAL SERVICES I CONSTRUCTION (ifapplicah/e) Wilton Manors, Florida 2008 (3) BRIEF DESCRIPTION (Bnefscope, Size, casl, elc.) AND SPECIFIC ROLE o Check if project performed with current firm . Managed design of roadway resurfacing, sidewalk installation and drainage improvements funded by both C. CBDG and DRl grants. (I) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED Flamingo Commons Office Park PROFESSIONAL SERVICES I CONSTRUCTION (if applicah/e) Davie, Florida 2007 d. (3) BRlEF DESCRIPTION (Bnefscope. size. COSI. elc.) AND SPECIFIC ROLE o Check if project perfomed y"th current firm . Civil project manager and chief designer for the new construction of a multi-use office park. This project had a total of 8 separate buildings totaling almost 100,000 square feet of office and retail space. 19 RELEVANT PROJECTS E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT Com lete one Section E or each ke 12, NAME JOHN MESSERIAN, PE 13. ROLE IN THIS CONTRACT Civil Engineering a. TOTAL 14 YEARS EXPERIENCE b. WITH CURRENT FIRM 35 6 15. FIRM NAME AND LOCATION (City and State) Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL 16. EDUCATION {DEGREE AND SPECIALIZATION) Graduate Studies in Environmental Sciences, West Virginia College of Graduate Studies, 1973 Bachelor of Science in Civil Engineering, Marshall University, 1971 17. CURRENT PROFESSIONAL REGISTRATION (STA IE AND /J/SClI'l.lNI,j Professional Engineer, Florida No. 47810 Professional Engineer, West Virginia No. 47810 LLS, West Vir inia, No. 0495 18. OTHER PROFESSIONAL QUALIFICATIONS (Publicatians, Organizatians, Training, Awards, etc.) Mr. Messerian has over 35 years of professional experience in the project management, planning and design of municipal projects, commercial buildings, highways, and airports. His extensive experience with construction and thorough knowledge of codes, regulations as they apply to each development is an asset for any project. In addition, his reputation with the permitting agencies has perpetuated a long list of successful and profitable projects. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Atlantic Isles Utility & Roadway Improvements PROFESSIONAL SERVICES I CONSTRUCTION (if applicahle) Sunny Isles Beach, FL 2008/2009 (3) BRIEF DESCRIPTION (Briefscape, size, cast, etc.) AND SPECIFIC ROLE I8J Check if project performed with current firm a. Mr. Messerian served as project manager for this project that serves 62 residences on an island with new water mains, sanitary sewer, and under grounding of electrical power, cable television, and telephone. In addition, drainage improvements including curb and gutter, retention areas, pollution retardant devices, and a stormwater collection system were constructed. Services, such as electric power, water, and sewer were financed by the City at the current rate of interest over a period of 15 years. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Shore Neighborhood Improvements PROFESSIONAL SERVICES I CONSTRUCTION (if applicahle) Miami Beach, FL Present (3) BRIEF DESCRIPTION (Briefscape, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm The project is located in the City of Miami Beach, in Miami-Dade County and consists of approximately 22,000 linear b. feet of roadway, swales, and sidewalks extending North Shore Neighborhood of Miami Beach. As project manager, Mr. Messerian was responsible for the implementation of all the BOOR's components, from design development through construction documentation and into construction management. . This involved the installation of medians and planting strips within the Right-of-Way, reconstruction of curb & gutter, reconstruction of swales, drainage structures and storm sewer, and sidewalks. (I) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Surfside Storm water Master Plan PROFESSIONAL SERVICES I CONSTRUCTION (if applimhle) Surfside, Florida 2008/2009 (3) BRIEF DESCRIPTION (Briefscape, size, cost, etc.) AND SPECIFIC ROLE I8J Check if project performed with current firm c. The project involved developing the Town of Surfside Stormwater Management Master Plan to address environmental protection and reduce flooding within the Town. The Master Plan included the engineering analysis through modeling of the stormwater management system to formulate the best approach to alleviate pollutant discharge loadings to Biscayne Bay from the project site and also to improve the hydraulic performance of the existing drainage system. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Surfside NPDES Permit PROFESSIONAL SERVICES I CONSTRUCTION (if applicahle) Surfside, Florida 2008-0ngoing d. (3) BRIEF DESCRIPTION (Briefscape, size, cost, etc.) AND SPECIFIC ROLE I8J Check if project performed with current firm CGA recently updated the Town's stormwater management program including an NPDES Guidance and Reference Manual with inspection schedules, inspection forms and required documentation and procedures. Mr. Messerian is coordinating the items set forth in the stormwater management program such as inspections of the stormwater controls and documentation of the conditions with the Town Staff. E. RESUMES OF KEY PERSONNEL PROPOSED FOR TillS CONTRACT Com tete one Section E or each ke 14 14. YEARS EXPERIENCE b. WITH CURRENT FIRM 3 JEFF MAXWELL, PE, PTOE 13. ROLE IN TillS CONTRACT Traffic Engineer - Traffic 0 eration Studies a. TOTAL 12 NAME 15 FIRM NAME AND LOCATION tOtyandSlale) Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL 16 EDUCATION tDfX;REE ANlJ SPfX7AUZA Tf(JN) B.S., Civil Engineering M.S., Transportation 17 CURRENT PROFESSIONAL REGISTRATION (STA IJ.;ANlJ /J/SCII'I./NJ..) Professional Engineer, Colorado, No. 35848 Professional Engineer, Arizona, No. 41711 Professional Engineer, Nevada, No. 17338 Professional Traffic Operations En ineer, No. 821 18. OTIIER PROFESSIONAL QUALIFICATIONS (Puhlicatiof/s, Orxanizaf/o/ls, Traif/inx, Award\', e/c) Mr. Maxwell has 14 years of management experience in traffic, transportation and land development engineering. He has a strong record of success in managing new markets and territories while simultaneously creating and strengthening traffic engineering departments. Extensive experience working directly with governmental review agencies. 19 RELEVANT PROJECTS (I) TITLE AND LOCATION (City and Slale) (2) YEAR CO~IPLETED Traffic Engineering Consultant: City of Homestead, City of PROFESSIONAL SERVICES CONSTRUCTION (if applicahfe) Greenacres, City of Parkland, City of West Park, City of Sunny 2008/Present Isles Beach, Town of Surfside, Florida a. (3) BRIEF DESCRIPTION (Bnefscape. si:e, cml. elc) AND SPECIFIC ROLE Check if project performed with current firm Provide ongoing traffic and transportation engineering services as needed including review of developer site plans and traffic studies, intersection analysis, traffic signal warrant analysis, alternative intersection design analysis including roundabouts, roadway signing and marking. (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED FDOT District IV General Planning Consultant PROFESSIONAL SERVICES CONSTRUCTION (if "pplicahfe) District IV, Florida 2008/Present (3) BRIEF DESCRIPTION (Briefscope. si:e, cosl, elc.) AND SPECIFIC ROLE Check if project performed with current finn b. Provide traffic and transportation analysis and review for FOOT District IV on an ongoing basis. Recent projects have included review of Developments of Regional Impact, Interstate corridor studies, IOAR and IMR reviews. (I) TITLE AND LOCATION (CUyand Slale) (2) YEAR COMPLETED SR 80 Access Control Plan - Loxahatchee Groves PROFESSIONAL SERVICES CONSTRUCTION (if applicahle) Palm Beach County, Florida 2009 r. (3) BRIEF DESCRIPTION (Briefscope. si:e, cosl. elc) AND SPECIFIC ROLE Check jf project performed with current firm Traffic and transportation analysis and design for an access control plan of SR 80 in the vicinity of Loxahatchee Groves. The project included intersection analysis, site access analysis, definition of performance standards, stakeholder and general public outreach and coordination with FOOT and adjacent communities. (1) TITLE AND LOCATION (Oly and Slale) (2) YEAR COMPLETED Master Roadway, Equestrian and Greenways Plan PROFESSIONAL SERVICES CONSTRUCTION (ifapplicahfe) Loxahatchee Groves, Florida 2009 (3) BRIEF DESCRIPTION (Brief scope, si:e, cosl, elc) AND SPECIFIC ROLE Check if project performed with current firm d. Traffic and transportation analysis and design for an overall master roadway plan for the Town of Loxahatchee Groves Florida. The project included traffic analysis on all local, collector and arterial roadways throughout the Town, definition of design and performance standards as well as coordination with FOOT, stakeholders and the general public. E. RESUMES OF KEY PERSONNEL PROPOSED FOR TillS CONTRACT (Colllvlete one Section E (or each ket /Jerson.) 13 ROLE IN THIS CONTRACT Electrical/Utilities Engineer 14. YEARS EXPERIENCE I b. WITH CURRENT ~IRM 12. NA~lE ROBERT ROUSH, PE a. TOTAL 39 15. FIRM N^"'I,lE AND LOCATION (City alld Slale) Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL 16. EDUCA liON (IJEGRAE AND SPECIAUZA lION) B.S. Electrical Engineering, Oklahoma A & M College, 1957 17. CURRENT PROFESSIONAL REGISTRA liON (.ITA n ANIJ DISC/PUN!:) Professional Engineer, State of Florida, No. 20957 18 OTHER PROFESSIONAL QUALlFICA TIONS (Publications, Organizations, Training, AH-'urd\', elc.) Mr. Roush has been providing electrical engineering services for over 39 years. Mr. Roush is the Director of Electrical Engineering in the Fort Lauderdale office. His experience includes the marketing, quality control and design phase of electrical systems for transportation, commercial, industrial and institutional facilities. 19. RELEVANT PROJECTS a. (I) TITLE AND LOCATION (cay alld Slale) Electrical Engineering Projects Various Locations, United States (3) BRIEF DESCRIPTION (Bmfscope. size, cosl. ele.) AND SPECIFIC ROLE (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (ifapplimhle) Various Check if project performed with current firm . Pembroke Pines Water Treatment Plant, Pembroke Pines, Florida North Bay Road - Street Lighting, Bay Harbor Islands, Florida N.E. 172nd Street - Street Lighting, Sunny Isles Beach, Florida Advanced Technology Research Center, Oklahoma State University, Stillwater, OK Maintenance Hangar Complex, McGuire AFB, NJ Federal Express Hangars 11 & 12, Memphis, TN United Airlines Line Maintenance Facility, Denver International Airport, CO Orthopedic Surgery Pavilion, Fort Worth, TX Wash Rack Modifications, American Airlines, Alliance Airport, Fort Worth, TX Hangar Modifications, American Airlines, Alliance Airport, Fort Worth, TX Education Service Center Expansion and Renovation, Region XI, Fort Worth, TX Christendom College Library, Front Royal, VA US Navy Bachelor Enlisted Quarters, Design-Build, Yorktown Weapons Station, Yorktown, VA National Geospatial and Intelligence Agency, Office Renovation - 40,000 SF - Maury Hall, Bethesda, MD National Imagery and Mapping Agency, Office Renovation - 52,000 SF - Maury and Abert Halls, Bethesda, MD DC Government, DC Armory, Replacement of Electrical Systems and Fire Alarm System, 588,000 SF Mobile District Corps of Engineers, Digital Multiple Range Complex 15% Design, Fort Carson, CO National Institute of Standards and Technology, Replacement of Mechanical and Electrical Systems in Buildings 220-226; Investigative Study and Report with Development of Three Schemes; Replacement of Mechanical and Electrical Systems in Building 222. National Institute of Standards and Technology, Study of Emergency Power for Building 225; Design/Build Emergency Generator and Chiller for Building 225 Department of Housing and Urban Development, Office Realignment - 72,000 SF Washington National Records Center, Suitland, MD. Design/Build Replace Stack Air Handling Units, Revise Lighting System, Revise Electric Distribution and Provide Emergency Power, Revise Fire Detection and Alarm System. Federal Reserve Board, 1709 New York Avenue. Switchgear Replacement, including distribution panel boards. Replace aluminum feeders with copper feeders. . . . . . . E. RESUMES OF KEY PERSONNEL PROPOSED FOR TillS CONTRACT (Complete one Section E for each key person.) 17 14 YEARS EXPERIENCE I b. WITH CURRENT ~RM 12. NAME SANDRA LEE, AICP LEED AP 13 ROLE IN THIS CONTRACT Biological Environmental Services a. TOTAL IS. FIRM NAME AND LOCATION (OtyandSlale) Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL 16 EDUCATION (IJtXiREE ANIJ SPf.OAUZA 7JON) M.A. Biology/Ecology, Magna Cum Laude, St. Cloud State University, Minnesota B.A. Biology/Botany, Magna Cum Laude, St. Cloud State Universit , Minnesota 17. CURRENT PROFESSIONAL REGISTRATION (STA mANIJ /JISClPUNJ,j American Institute of Certified Planners, No.018627 LEED AP 18 OTHER PROFESSIONAL QUALIFICATIONS (Publication.\', ()rKaJlizaliv/ls, Trainill}?, A>>'ord'l, etc.) Ms. Lee has 17 years of professional experience and heads up CGA's Environmental Planning Department coordinating our regulatory permitting, environmental planning, site assessment, resource management and environmental technical support services. Prior to joining CGA, Ms. Lee was a Biologist with the Growth Management Division of Monroe County. In general, Ms. Lee: . Provides permitting services for environmental resources permits at the local, state and federal level . Coordinates interagency and multi-disciplinary team efforts . Provides the most feasible development and mitigation options, and the probable costs for mitigation options . Provides tree mitigation plans and tree removal permitting services . Conducts wetland delineations and wetland functional assessments . Prepares Coastal and Conservation Elements for Comprehensive plans, coordinates on Comprehensive Plan Evaluation and Appraisal Reports (EAR) and EAR based amendments . Designs wetland mitigation areas, provides bidding and construction oversight services for the construction and installation of mitigation areas . Provides technical support, environmental resource management and environmental planning services to municipalities . Manages the compliance monitoring on over 2,000 acres of constructed wetlands and administers the maintenance contract on over 2,000 acres of created and enhanced wetlands . Manages field staff conducting wildlife and habitat assessments, imperiled species surveys and compliance monitoring reporting 19. RELEVANT PROJECTS (I) TITLE AND LOCATION (Cilyand Slate) (2) YEAR COMPLETED Berman Park Preserve Mitigation Area PROFESSIONAL SERVICES I CONSTRUCTION (if applin/hie) Davie, Florida (3) BRIEF DESCRIPTION (Bnefscope. s.ze. niSI. el<) AND SPECIFIC ROLE t8I Check if project performed with current firm a. Created diverse upland and wetland habitat to wetland dependent wildlife. Involved in restoring and creating wetland habitats within 28.4 acres of upland and wetland pastureland heavily infested with invasive/nuisance species. Existing isolated tree islands containing native trees and shrubs were identified and protected from mechanical disturbance, while the site was cleared of exotic trees and the marsh and slough habitats were excavated. After clearing and excavation, native plant species were installed. Monthly monitoring continues. (I) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED Pembroke Falls Development, Engle Homes PROFESSIONAL SERVICES I CONSTRUCTION (if applin/hie) Pembroke Pines, Florida (3) BRIEF DESCRIPTION (Briefscope. size. cosl, ele) AND SPECIFIC ROLE t8I Check if project performed with current firm b. Commencing in 1992 and completed in 1999, this project involved construction of a residential community of 1,SOC multi-family and 2,000 single-family homes plus commercial office development, parks, and schools on 1,428 acres. It also involved creating a 204 are, high-quality fresh water wetland system, a mix of forested wetland, marsh, hammock open water habitat, and Wood Stork feeding areas. Continues quarterly field monitoring and regulatory compliance. (I) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED City of Weston Various Environmental Projects PROFESSIONAL SERVICES I CONSTRUCTION (if applleahle) Weston, Florida (3) BRIEF DESCRIPTION (Briefscope, size, cml. ele) AND SPECIFIC ROLE t8I Check if project perfanned with current firm Provides field monitoring, preparation, and submittal of compliance monitoring reports, in accordance with county, c. state, and federal regulatory agency requirements, for numerous wetland mitigation and preservation sites that comprise 2,000 acres of created and restored wetlands from historic Everglades sawgrass habitat, marshes and sloughs with tree islands, littoral shelves, and transitional wetlands. Oversees control of invasive exotic vegetation through scheduled inspections. Reviews all development applications for compliance with landscape and tree preservation codes. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT Com lete one Section E for each ke 22 14 YEARS EXPERIENCE b. WITH CURRENT FIRM 6 12. NAME SABRINA BAGLIERI 13. ROLE IN TillS CONTRACT Construction Administration a. TOTAL 15 FIRM NAME AND LOCATION (City alld Slale) Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL 16 EDUCATION (m:GRf:E AND SPf.DAUZA nON) B.S., Civil Engineering, Universidad Rafael Urdaneta Maracaibo, Venezuela 17. CURRENT PROFESSIONAL REGISTRATION (STA Tf: AND DISc/PUNic) CTQP Final Estimates 1 CTQP Earthwork Construction Inspector 1 18 OTHER PROFESSIONAL QUALIFICATIONS (Puhlications, Organizalions, Training, Awards, elc.) Director of Construction Services. Responsible for all municipal construction services. Administers construction contracts from bidding through close-out. Proficient in all aspects of horizontal construction, and contract administration. 19. RELEVANT PROJECTS (I) TITLE AND LOCATION (Cily alld Slale) (2) YEAR COMPLETED 18151 Drive Active Park Sunny Isles Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTIO~(go~imhle) 2008 (3) BRIEF DESCRIPTION (Briefscope, size, cosl. etc.) AND SPECIFIC ROLE t8] Check if project performed with current firm a. Mr. Baglieri was responsible for the construction administration and inspection services for the construction of a two acre park consisting of a gymnasium, a new recreation center, a baseball field, a parking lot, and landscaping (1) TITLE AND LOCATION (Cilyulld SIUle) (2) YEAR COMPLETED NW 172nd Street & North Bay Roadway Improvements PROFESSIONAL SERVICES I CONSTRUCTION (if uppl1mhle) Sunny Isles Beach, Florida 2008/2009 2008/2009 (3) BRIEF DESCRIPTION (Bnefscope, size. cosl. elc.) AND SPECIFIC ROLE ~ Check ifproject performed with current firm b. The scope of work included redesigning an existing roadway for the purposes of enhancing the City's public right-of- way and increasing safety. Mr. Baglieri was responsible for the construction administration and inspection services for the construction of improvements including roadway widening, median placements, street lighting, sidewalk layout, and landscaping. (I) TITLE AND LOCATION (City u"d SIUle) (2) YEAR COMPLETED Atlantic Isles Utility & Roadway Improvements PROFESSIONAL SERVICES I CONSTRUCTION (ifuppl1cuhle) Sunny Isles Beach, Florida 2008/2009 2009 (3) BRIEF DESCRIPTION (Bnefscope, Size. COSI. etc.) AND SPECIFIC ROLE t8] Check if project performed with current firm c. Mr. Baglieri was responsible for the construction administration and inspection services for this project that services 62 residences on an island with new water mains, sanitary sewer, and under grounding of electrical power, cable television, and telephone. In addition, drainage improvements including curb and gutter, retention areas, pollution retardant devices, and a stormwater collection system were constructed (1) TITLE AND LOCATION (Cily ""d Slale) (2) YEAR COMPLETED Various Projects PROFESSIONAL SERVICES I CONSTRUCTION (if appl1cahle) Various Locations, Florida Various Various (3) BRIEF DESCRIPTION (Briefscope, size. cosl. etc.) AND SPECIFIC ROLE 181 Check ifproject performed with current firm . Taft Street Roadway Improvement, City of Pembroke Pines, FL . SW 69th St Drainage Improvements, City of Pembroke Pines, FL . Florida Department of Transportation, Construction of Rip-Rap Against Embankment, Broward County, Florida d. . Florida Department of Transportation, Drainage Improvement SR-436 and Maitland Boulevard, Seminole County, Florida . Cooper City Commerce Center, Installation of Water, Sewer & Drainage, Site Work, Paving, Broward County, Florida . Park of Commerce Center, Installation of Water, Sewer & Drainage, Site Work Paving, Broward County, Florida E. RESUMES OF KEY I'ERSONNEL PROPOSED FOR THIS CONTRACT (Comnlete one Section E for each ke nerson.\ 36 14 YEARS EXPERIENCE -, b WITH CURRENT ~RM BRUCE BERNARD 13. ROLE IN THIS CONTRACT Construction Services a TOTAL 12 NAME 15. FIRM NAME AND LOCA nON (City alld Slate) Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL 16 EDUCA nON (m:GREE AND SPf.DAUZA 11ON) Broward Community College, 1972 University of Michigan Utility Management Course, 1979 17 CURRENT PROFESSIONAL REGISTRA nON (STA Tf.' AND DlSClPUNf,; Certificate of Training - Disaster Recovery Disaster Debris Management FEMA Emergency Management Utility Terrorism Preparation and Response Asphalt Pavement Maintenance Licensed in Water and Wastewater Plant o erations 18. OTHER PROFESSIONAL QUALIFICATIONS (Publical1o/ls, Organizations, Training, Award\", etc.) Mr. Bernard's experience and education has been obtained through on the job training within related fields. Beginning with the plumbing trade in the early 1970s, he was able to progress to public and private utility plant and field operations for ten years. He advanced to the public sector for fourteen years. During his tenure in the public sector, Mr. Bernard gained knowledge of drainage concepts and installation, water and wastewater design and installation, roadway construction, and trail system management and wetland requirements. He served for six years as Department Director for Public Works and Capital Projects. Mr. Bernard gained experience in drainage system layout and maintenance, right-of-way maintenance, Capital Improvement project and preparations, plus coordinating of projects through governmental agencies. 19 RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Field Manager PROFESSIONAL SERVICES T CONSTRUCTION (if applicable) 2006-Present iJ. (3) BRIEF DESCRIPTION (Briefscape, size, cast, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Mr. Bernard is responsible for project construction management, installation inspection, and field coordination of site work, roadways, drainage and underground utilities. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Public Works Director, Town of Davie PROFESSIONAL SERVICES T CONSTRUCTION (if applicable) Davie, Florida 1981-2006 (3) BRIEF DESCRIPTION (Briefscape, size, cast, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Directed operations within department in regard to buildings, parks, roadway, right-of-way, tra iI system and b. storm water maintenance. He was responsible for the management of Town of Davie Capital Projects including construction for parks and governmental buildings. He supervised a staff of seventy-two employees, managed a six- million dollar department budget, and eight million dollar capital improvement budget. During his tenure with the Town of Davie, Mr. Bernard served as Chief Wastewater Operator, Assistant Utility Director, Capital Projects Coordinator, and Chief Engineering Inspector. (I) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Lead Operator Wastewater Plant, City of Lauderhill PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Lauderhill, Florida 1976-1981 c. (3) BRIEF DESCRIPTION (Briefscape, size, cast, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Mr. Bernard supervised the operations at a 4 MGD Wastewater Plant with sand filters with polishing pond for surface water discharge. He gained experience in dealing with governmental agencies, activity reports, payroll detailing and supervisory skills overseeing a staff of ten. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Plant Operator, Southern Gulf Utilities, Florida PROFESSIONAL SERVICES 1 CONSTRUCTION (if applicable) 1974-1976 d. (3) BRIEF DESCRIPTION (Briefscape, size, cas~ etc.) AND SPECIFIC RDLE ~ Check if project performed with current firm Mr. Bernard began as an operator trainee and achieved both water and wastewater operator's licenses within one year. He worked to gain knowledge offield operation and plant design. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Plumbers Apprentice, Mears Plumbing PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Florida 1972-1974 e. (3) BRIEF DESCRIPTION (Briefscape, size, cas~ etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Mr. Bernard was responsible for installing rough and top-out installation in newly constructed residential units. E. RESUMES OF KEY PERSONNEL PROPOSED FOR TillS CONTRACT (Comvlele one Seclion E for each ke} verson.J 16 14. YEARS EXPERIENCE b. WITH CURRENT FIR.\1 3 HELENE WETHERINGTON, AICP CEM 13. ROLE IN TillS CONTRACT Hurricane Recovery and Debris Monitoring Services a TOTAL 12. NA~lE 15 FIR.'l NAME AND LOCATION (Oly alld SllIIe) Calvin, Giordano & Associates, Inc. 16. EDUCATION (m;CRf.r,' AND SPEc/AUZA T10N) Masters of Science in Public Administration - Florida Atlantic University Masters of Science in Urban and Regional Planning, Florida State Universit 17. CURRENT PROFESSIONAL REGISTRATION (STA IE AND /)/SC1PUN1,) Certified Emergency Manager (CEM) American Institute of Certified Planners (AICP) 18 OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Trail/ing, Award\', ere.) Ms. Wetherington has more than 16 years of federal, state and local emergency preparedness, planning, response, and recovery experience. She has overseen comprehensive emergency management planning efforts with over 100 public, private, and non-profit organizations. In addition, she has developed state and local hazard-specific plans for terrorism response, wild land fires, radiological emergency preparedness, mass migration events, dike breach, flooding, and hurricanes. She has coordinated FEMA and state sponsored training programs, instructed numerous curriculums nationwide including FEMA's Evacuation and Re-entry Course. 19 RELEVANT PROJECTS (I) TITLE AND LOCATION (Cily alld Slale) (2) YEAR COMPLETED Calvin, Giordano & Associates, Inc PROFESSIONAL SERVICES I CONSTRUCTION (if applicahle) 2005/Present (3) BRIEF DESCRIPTION (Briefscope. si=e, CIISI. elc.) AND SPECIFIC ROLE 181 Check if project performed with current firm Ms Wetherington is the Emergency Management Services Director for the emergency management services division at CGA which focuses its services on the ongoing support of municipal and county emergency management programs in a. Florida. For Palm Beach County, she led planning efforts, a regional summit, behavioral survey, transportation study, and outreach products for Palm Beach County's vulnerable Lake Okeechobee / Herbert Hoover Dike response effort. She is managing the long-term development and maintenance of two municipal emergency management programs (West Park, and Weston) and supports numerous other local governments in the development of CEMPs, NIMS compliance, Continuity of Operations Plans, Post Disaster Redevelopment Plan, Economic Recovery Plans, training and ongoing exercises. CGA served as technical advisors and planning staff to the FEMA sponsored catastrophic planning effort in South Florida where CGA was resDonsible for developing numerous plan components. (I) TITLE AND LOCATION (Olyalld Slale) (2) YEAR COMPLETED ICF Consulting, Emergency Management and Homeland PROFESSIONAL SERVICES T CONSTRUCTION (if applicahle) Security Practice, Senior Associate 2004/2005 (3) BRIEF DESCRIPTION (Briefscope. si=e. cosl, ele.) AND SPECIFIC ROLE I8J Check if project performed with current firm Ms. Wetherington was the Project Manager for the National Capital Region (NCR) Regional Emergency Management Accreditation Program (EMAP) assessment which is a national pilot program to evaluate the emergency management capability of 18 jurisdictions in the NCR against national standards. She participated in the NCR 2005 evacuation exercise. She supported the development of the NIMS compliant Emergency Operations Plan for the City of Chicago. b. Ms. Wetherington supported the implementation of Homeland Security Presidential Directives 5 and 7 by drafting elements of the Universal Task List and the Target Capability List. She also supported the development of the National Infrastructure Protection Program as a subject matter expert to the healthcare and public health sector. Furthermore, she provided direct support to the Office for Domestic Security in the revisions to the Homeland Security Exercise and Evaluation Program (HSEEP) and served as a HSEEP instructor. She has served as exercise evaluator on homeland security related exercises in the State of Nebraska and Massachusetts. She also supported the development of the Family of Emergency Workers Plan for the regional planning agency in Massachusetts. (I) TITLE AND LOCATION (Cilyalld Slale) (2) YEAR COMPLETED Palm Beach County, Division of Emergency Management PROFESSIONAL SERVICES I CONSTRUCTION (if applicahle) (DEM), Assistant Director 1998/2004 (3) BRIEF DESCRIPTION (Bnef scope, 51=e. cosl. elc.) AND SPECIFIC ROLE 181 Check if project performed with current firm c. Ms. Wetherington administered DEM programs and personnel for planning, public outreach, training and exercise, recovery and mitigation programs. She served as liaison and coordinated with 37 municipalities, 100+ public/private/nonprofit partner organizations, state and federal government agencies ensuring consistency with State and National Response plans. E. RESlJMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT Com tete one Section E or each ke 12. NAME GIANNO FEOLI, ASLA, AlA 13 ROLE IN THIS CONTRACT Landscape Architecture 14 YEARS EXPERIENCE b WITH CURRENT FIRM a. TOTAL 8 6 15. FIRM NAME AND LOCATION (City and Stale) Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL 16 EDUCATION (DH;REE AND SPF;CIAUZA lION) Master of Landscape Architecture, Florida International University, School of Architecture, Miami, Florida B.A., Architectural Studies, Florida International Universit , School of Architecture, Miami, Florida 17. CURRENT PROFESSIONAL REGISTRATION (Sf A IE AN/J D1SCII'UNf) 18. OTHER PROFESSIONAL QUALIFICATIONS (Pub/h:alions, OrxallizatiuflS, Train/ilK, Awardl, etc.) Mr. Feoli leads the Landscape Department in creative design strategies and whose specialties include urban design, contextual analysis and branding. His also leads all of CGA's master planning, community participation efforts and graphic communication services. His experience has encompassed a wide array of project-types, but his strengths lie in park design, streetscapes and urban interventions, and form-based urban design and planning. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (CIty and Slare) Doral Streetscape Beautification Doral, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (ifapplicahle) 2006 a. (3) BRIEF DESCRIPTION (Bnefscope. SIze, COSI, elc.) AND SPECIFIC ROLE 181 Check ifproject performed with current firm Designing entire length of Doral Boulevard (NW 36th StreetjNW 41st Street) from Palmetto Expressway to Florida's Turnpike. Signature plantings will encompass a gateway design with special obranding" elements to distinguish the new City. This will include special pavers and lush plantings while maintaining safe line-of-sight for the heavily used roadwa that is closel ed ed with businesses, olf courses, resorts, and ated residential communities. (1) TITLE AND LOCATION (Oly and Slale) North Shore Neighborhood Improvements Miami Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (ifapplicahle) 2006 b. (3) BRIEF DESCRIPTION (Brrefswpe, .\l:e. CO.II. elc.) AND SPECIFIC ROLE 181 Check if project performed with current firm Mr. Feoli was responsible for the implementation of all the BOOR's components, from design development through construction documentation and into construction management. The agenda for the project was to ensure aesthetic qualities in neighborhoods that presently have an ever-increasing demand for parking. To affect this, the installation of planted bulb-outs, medians and planting strips within the Right-of-Way were implemented to beautify the neighborhoods, provide shade for pedestrians, lessen the amount of storm water runoff demands of the existing infrastructure and minimize the existin heat-island conditions.. (1) TITLE AND LOCATION (CIty and Slale) (2) YEAR COMPLETED Sunny Isles Town Center PROFESSIONAL SERVICES CONSTRUCTION (ifapplicahle) Sunny Isles Beach, Florida 2004 (3) BRIEF DESCRIPTION (Brrefscope, SIZe. cosl. elc.) AND SPECIFIC ROLE 181 Check if project performed with current firm Mr. Feoli was responsible for creating a vision for the newly established Sunny Isles Town Center, through the development of zoning ordinances specific to the 'district'. Mr. Feoli worked closely with civic and community leaders to address the City's and the residents' concerns pertaining to overall densities, building heights, land uses, volumetric character of the building masses, and open space requirements. Mr. Feoli, as a part of the visioning process, developed a conceptual master plan that would alternatively drive the patterns of development in the town center. In addition, great emphasis was given to the character of the sidewalk conditions and how they promote a pedestrian-friendly and street-level culture that drives the vitality of a town center. Mr. Feoli presented the concepts and gained public input and consensus throu h several communi worksho sand throu h commission hearin s. (I) TITLE AND LOCATION (CIty and Slale) (2) YEAR COMPLETED Community Enhancements PROFESSIONAL SERVICES CONSTRUCTION (ifapplicahle) Ba Harbor Islands, Florida 2006 (3) BRIEF DESCRIPTION (Briefscope, size. COSI, ele.) AND SPECIFIC ROLE 181 Check if project performed with current firm Mr. Feoli worked closely with Town Staff to devise a strategy for improving the qualities and character of the Town's west island's neighborhood, something the Town had been struggling with for over 5 years prior to contracting CGA. The project consists of engineering and landscape improvements that will in essence upgrade the residential streets. The proposal provides for designated walking areas, planted and irrigated bulb-outs and signage throughout. While the scope of the project is similar to others in nature that CGA has performed, this project stands out as one where CGA's heavy involvement in marketing, graphics and conflict resolution took center stage. These skills aided Mr. Feoli is facilitating approval of the final design strategy, despite competing interests tearing it at its seams with varying riorities: arkin versus safe versus beau all in less than ade uate s ace. c. d. E. RESUMES OF KEY PERSONNEL PROPOSED FOR TillS CONTRACT Com fete one See/ion E or each ke 14. YEARS EXPERIENCE 12 NAME ROBERTJACKSON,PSM 13. ROLE IN THIS CONTRACT Surveying & Mapping a TOTAL 40 b. WITH CURRENT FIRM 15 I s. FIRM NAME AND LOCA TJON (City and Slale) Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL 16. EDUCATION (Df.'(jRH; AND SP/oX.'fALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (SfAff; AND mSCIf'LlN/,j Professional Surveyor & Mapper, FL, No.4158 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Jackson has 40 years of experience in all phases of land surveying including boundary, coastal control, hydrographic, route surveys, topographic, and as-built surveys; sketch and descriptions; legal descriptions, record plats; and, boundary descriptions for annexations and de-annexations for municipalities. Mr. Jackson is highly active in professional surveying organizations and is currently President of the Florida Surveying and Mapping Society. In this role, he reviews Florida surveying laws and is helping to develop a plan to professionally address GIS mapping and new technologies in surveying. As part of this, he implemented memorandums of understanding with allied professions (planners, geologists, biologists, environmental scientists, lawyers, engineers, architects, landscape architects). He assisted the promotion of an effective voice in the Florida legislature and taught Florida Laws, a six-hour course required for professional surveyors. He supports the four- year-degree requirement and to benefit the University of Florida Scholarship Fund for the Geomatics program, he has organized golf tournaments which raised approximately $10,000. As part of the Planting Seeds Program, he is spear-heading a plan to introduce the surveying profession to students throughout the nation. Prior to CGA, Mr. Jackson worked for the Florida Department of Transportation as a rodman, instrument man, and party chief. His last position there was in the Right-of-Way (R/W) Engineering Department Calculation Section, where he prepared RjW maps. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Diplomat Hotel PROFESSIONAL SERVICES I CONSTRUCTION (if applicabie) HoIlywood/Hallandale Beach, FL (3) BRIEF DESCRIPTION (Briefscope, size, cast, etc.) AND SPECIFIC ROLE 181 Check if project performed with current firm Prepared coastal control surveys for the 38-story Diplomat Hotel in accordance with 61G17-6 and 62B-33.09 of the FL Administrative Code. Consultant for compliance with FEMA requirements; provided exhibits and elevation certificates that reflected compliance with FEMA b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR-706 PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Palm Beach County, FL (3) BRIEF DESCRIPTION (Briefscope, size, cast, etc.) AND SPECIFIC ROLE 181 Check if project performed with current firm Responsible for coordinate geometry calculations of recorded plats, lot lines, and review of the title work for ownership. Worked with the Maintenance Engineer and the Location Survey Department to determine the maintained R/W. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Harbor Isles PROFESSIONAL SERVICES I CONSTRUCTION (if applicabie) Dania Beach, FL (3) BRIEF DESCRIPTION (Briefscope, size, cos~ etc.) AND SPECIFIC ROLE 181 Check if project performed with current firm Oversight of project that includes ingress/egress easements, drainage easements, and boundary surveys, topographic surveys, for a 56-building condo project d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Broward Boulevard (SR-7 to Andrews Avenue) PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Fort Lauderdale, FL (3) BRIEF DESCRIPTION (Briefscope, size, cos~ etc.) AND SPECIFIC ROLE 181 Check if project performed with current firm Responsible for coordinate geometry calculations and R/W. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Westbrooke Communities Projects - Pine Island, Miramar DRI, PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Quantum, Merrick Preserve, Meadow Pines. (3) BRIEF DESCRIPTION (Brief scope, size, cas~ etc.) AND SPECIFIC ROLE 181 Check if project performed with current firm Survey Project Manager. Oversight of projects that includes ingress/egress, drainage easements, and boundary surveys, topographic surveys, route surveys, and hydrographic surveys and letter of map revisions to the Federal Emergency Management Agency for various condominium projects including Canterbury in the City of Boynton, Monterey Bay in the City of Boynton Beach, Cobblestone in the City of Pembroke Pines, Cimarron in the Town of Davie, Merrick Preserve in the City of Margate and Montclair in the City of Miramar. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Comnlete one Section F for each proiect.) 21. TITLE AND LOCATION (City and State) ATLANTIC ISLES UTILITY & ROADWAY IMPROVEMENTS Sunny Isles Beach, Florida 20. EXAMPLE PROJECT KEY NUMBER 1 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION 2009 (If applicable) 2009/2010 23. PROfECT OWNER'S INFORMATION b. POINT OF CONTACT NAME Rick Conner, P.E. City Manager 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) c. POINT OF CONTACT TELEPHONE NUMBER (305) 792-1928 a. PROJECT OWNER City of Sunny Isles Beach The project is located in the City of Sunny Isles Beach, in Miami-Dade County and consists of approximately 3,000 linear feet of roadway, swales, and sidewalks extending from Collins Avenue to the end of Atlantic Boulevard. By means of a Special Assessment, the completed project will service 62 residences on an island with new water mains, sanitary sewer, and under grounding of electrical power, cable television, and telephone. In addition, drainage improvements including curb and gutter, retention areas, pollution retardant devices, and a storm water collection system were constructed. Services, such as electric power, water, and sewer were financed by the City at the current rate of interest over a period of15 years. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Calvin, Giordano & Associates, Inc. Fort Lauderdale, Florida Civil & Electrical Engineering, Survey, Landscape Architecture, Construction Management b. c. d. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Comolete one Section F for each oroiect.) 21. TITLE AND LOCATION (City and State) CAPITAL IMPROVEMENT PROGRAM Sunny Isles Beach, Florida 20. EXAMPLE PROJECT KEY NUMBER 2 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION Present (If applicable) Present a. PROJECT OWNER City of Sunny Isles Beach 23. PROJECT OWNER'S INFORMATION b. POINT OF CONTACT NAME Rick Conner, P.E. City Manager 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) c. POINT OF CONTACT TELEPHONE NUMBER (305) 792-1928 CGA manages the $36-million capital improvement program for the City. Current projects in the program include various FP&L utility relocations, sea wall replacement, new city hall governmental facility, new active park facility, pedestrian bridge study, roadway reconstruction and traffic calming, decorative street lighting installation, new parking lot construction, landscaping improvements, resident-only parking facilities, drainage improvements, and assistance with grant applications. CGA has provided land planning and development services to this emerging City as well as general engineering services, GIS, traffic engineering, and grants management. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Calvin, Giordano & Associates, lnc. Fort Lauderdale, Florida Civil & Electrical Engineering, Surveying, Landscape Architecture, Traffic, Planning, Construction Management b. c. d. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Comolete one Section F for each oroiect) 21. TITLE AND LOCATION (City and State) NE 172nd STREET & N. BAY RD ROADWAY IMPROVEMENTS Sunny Isles Beach, Florida 20. EXAMPLE PROJECT KEY NUMBER 3 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION 2006-2008 (If applicable) 2009 23. PROJECT OWNER'S INFORMATION b. POINT OF CONTACT NAME Rick Conner, P.E. City Mana2er 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) c. POINT OF CONTACT TELEPHONE NUMBER (305) 792-1928 a. PROJECT OWNER City of Sunny Isles Beach The City of Sunny Isles Beach requested engineering services for the roadway improvements to existing N.E. 172nd Street and North Bay Road. The improvements included roadway widening, median placements, street lighting, sidewalk layout, and landscaping. Calvin, Giordano & Associates, Inc.'s services included surveying, civil engineering design, utility relocation, street lighting design, and landscaping design. The scope of work included redesigning an existing roadway for the purposes of enhancing the City's public right- of-way and increasing safety. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROIECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Calvin, Giordano & Associates, Inc. Fort Lauderdale, Florida Civil & Electrical Engineering, a. Traffic, Survey, Landscape Architecture, Construction Management b. c. d. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Comnlete one Section F for each project.) 21. TITLE AND LOCATION (City and State) SRA1A at NE 175th MEDIAN CLOSURE STUDY City of Sunny Isles Beach 20. EXAMPLE PROJECT KEY NUMBER 4 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION 2008 (If applicable) a. PROJECT OWNER City of Sunny Isles Beach 23. PROJECT OWNER'S INFORMATION b. POINT OF CONTACT NAME Rick Conner, P.E. City Manager 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) c. POINT OF CONTACT TELEPHONE NUMBER (305) 792-1928 The City of Sunny Isles Beach requested a traffic engineering study be completed to support the closing of the NW 175th Terrace median opening along SR AIA (Collins Avenue). The study limits of the project included SR AlA (Collins Avenue) from NW 174 Street to NW 178 Street. The scope of services included, AM and PM field observation, condition diagram, data collection, crash analysis, collision diagrams, existing condition operational analysis, future condition operational analysis and recommendations. In addition, CGA has secured FOOT LAP Funding for the project and is coordination the project on behalf of the City. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Calvin, Giordano & Associates, Inc. Fort Lauderdale, Florida Traffic a. b. c. d. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each vroiect) 21. TITLE AND LOCATION (City and State) COMMUNITY ENHANCEMENT PROJECT - PHASE II Bay Harbor Islands, Florida 20. EXAMPLE PROJECT KEY NUMBER 5 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION 2008/2009 (If applicable) 23. PROJECT OWNER'S INFORMATION b. POINT OF CONTACT NAME Ron Wasson City Mana~er 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) a. PROJECT OWNER Town of Bay Harbor Islands c. POINT OF CONTACT TELEPHONE NUMBER (305) 866-6241 Calvin, Giordano & Associates provided professional services to the Town of Bay Harbor Islands to improve the neighborhood on the north side of the Town's west island. The project repaved two miles of roadways, added drainage improvements and replaced 40,000 LF of curbs. The project also features landscaping and irrigation improvements at all intersections and new bulb-outs added midblock. The project also added decorative street lighting to this island. CGA provided Final Plans, Permitting and Bid Documents for the project. CGA is currently providing on-site construction inspection services to the Town for this project. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Calvin, Giordano & Associates, Inc. Fort Lauderdale, Florida Civil & Electrical Engineering, a. Landscape Architecture, Survey, Construction Management b. c. d. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Comolete one Section F for each oroiect) 21. TITLE AND LOCATION (City and State) NORTH SHORE NEIGHBORHOOD IMPROVEMENTS Miami Beach, Florida 20. EXAMPLE PROJECT KEY NUMBER 6 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION Ongoing (If applicable) a. PROJECT OWNER City of Miami Beach 23. PROIECT OWNER'S INFORMATION b. POINT OF CONTACT NAME Miguel Perez c. POINT OF CONTACT TELEPHONE NUMBER (305) 673-7071 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The project is located in the City of Miami Beach, in Miami-Dade County and consists of approximately 22,000 linear feet of roadway, swales, and sidewalks extending North Shore Neighborhood of Miami Beach. CGA was responsible for the implementation of all the BODR's components, from design development through construction documentation and into construction management. This involved the installation of medians and planting strips within the Right-of-Way, reconstruction of curb & gutter, reconstruction of swales, drainage structures and storm sewer, and sidewalks. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Calvin, Giordano & Associates, Inc. Fort Lauderdale, Florida Civil & Electrical Engineering, a. Landscape Architecture, and Survey b. c. d. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT {Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.} 21. TITLE AND LOCATION (City and State) CITY EMERGENCY PLANNING Osceola County, Florida 20. EXAMPLE PROJECT KEY NUMBER 7 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION 2008/2009 (If applicable) a. PROJECT OWNER Osceola County 23. PROJECT OWNER'S INFORMATION b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Dave Casto / County Emergency (407) 742-9000 Mgmt Director 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Calvin, Giordano & Associates, Inc. developed Comprehensive Emergency Management Plans for the cities of Kissimmee and St. Cloud in order to develop consistency, continuity, and compliance with the Orange County Emergency Management System. The plans were fully restructured to meet National Incident Management System requirements while ensuring to address the unique preparedness, response, recovery, and mitigation needs of their unique communities 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Calvin, Giordano & Associates, Inc. Fort Lauderdale, Florida Emergency Management Services a. b. c. d. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT {Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.} 21. TITLE AND LOCATION (City and State) PEMBROKE PINES PUBLIC SERVICE CAMPUS Pembroke Pines, Florida 20. EXAMPLE PROJECT KEY NUMBER 8 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION 2009/2010 (If applicable) On2oin2 23. PROJECT OWNER'S INFORMATION b. POINT OF CONTACT NAME Martin Gayeski Assistant City Mana2er 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) c. POINT OF CONTACT TELEPHONE NUMBER (954) 437-1116 a. PROJECT OWNER City of Pembroke Pines With the expansion of their wastewater treatment plant, the City is relocating its' Public Services Campus further east to a defunct golf course site purchased by the City. Calvin Giordano & Associates, Inc. (CGA) is providing engineering and landscape architecture services to the City for a proposed facility which consists of the construction of a two-story administrative office building, and three other buildings that function as City garages for maintenance and for storage. The complex will have 85,000 square feet under roof, including a City fueling station, and will be designed to GBC LEED "silver" standards. In addition, the overall City site includes approximately 30 acres of wetland mitigation as part of a permit issued by SFWMD, Broward County, and the Army Corps of Engineers to compensate for wetlands disturbed with the construction of parking at Pembroke Pines City Center, and the upgrading of perimeter canals to South Broward Drainage District (SBDD) standards. CGA has designed the turn lanes on Pembroke Road, entry road into the site, the 30% Basis of Design Plans for the Public Services Campus and the offsite water and sewer extensions for issuance under a design/build RFP. The project is currently in the permitting and bidding phase. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Calvin, Giordano & Associates, Inc. Fort Lauderdale, Florida Civil & Electrical Engineering, a. Traffic, Landscape Architecture, Construction Management, and Surveying b. c. d. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Comvlete one Section F for each vroiect. ) 21. TITLE AND LOCATION (City and State) MANATEE ISLES DRIVE ROADWAY IMPROVEMENTS Weston, Florida 20. EXAMPLE PROJECT KEY NUMBER 9 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION 2009 (If applicable) 2010 23. PROJECT OWNER'S INFORMATION b. POINT OF CONTACT NAME John Flint City Mana~er 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) c. POINT OF CONTACT TELEPHONE NUMBER (954) 385-2000 a. PROJECT OWNER City of Weston This project for the City of Weston, which is nearing substantial completion in the construction phase, was designed to widen and provide drainage improvements on Manatee Isles Drive between SW 196th Avenue and South Post Road. The project also included milling and resurfacing, median work, installation of curb and gutter, signing and marking upgrades, and a Maintenance of Traffic plan, in addition to proposed electrical, landscape and irrigation work. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Calvin, Giordano & Associates, Inc. Fort Lauderdale, Florida Civil & Electrical Engineering, a. Landscape Architecture, Survey, Traffic, Construction Mgmt b. c. d. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) SURFSIDE STORMWATER MASTER PLAN Surfside, Florida 20. EXAMPLE PROJECT KEY NUMBER 10 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION 2008/2009 (If applicable) 23. PROJECT OWNER'S INFORMATION b. POINT OF CONTACT NAME Gary Word Town Manager 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) c. POINT OF CONTACT TELEPHONE NUMBER (305) 861-4863 a. PROJECT OWNER Town of Surfside The project involved developing the Town of Surfside Stormwater Management Master Plan to address environmental protection and reduce flooding within the Town. The Master Plan included the engineering analysis through modeling of the stormwater management system to formulate the best approach to alleviate pollutant discharge loadings to Biscayne Bay from the project site and also to improve the hydraulic performance of the existing drainage system. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Calvin, Giordano & Associates, Inc. Fort Lauderdale, Florida Civil engineering, Electrical a. Engineering, Surveying, Landscape Architecture, Construction Services b. c. d. G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 28. EXAMPLE PROJECTS LISTED IN SECTION F 26. NAMES OF K1EY 27. ROLE IN THIS (Fill in "Example Projects Key" section below before completing table. Place PERSONNEL CONTRACT "X" under project key number for (From Section E, (From Section E, participation in same or similar role.) Block 12) Block 13) 1 2 3 4 5 6 7 8 9 10 Dennis Giordano Principal-in-Charge X X X X X X X X X X Douglas Taylor, PE Project Manager X X X X X Shaun Bamforth, PE LEED AP Civil Engineer X X X X john Messerian, P.E. Civil Engineer X X X X X Gianno Feoli Landscape Architect X X X X X Robert Roush, PE Electrical Engineer X X X X X X Jeff Maxwell, PE PTOE TrafficjTransporta tion X X X X Engineer Robert jackson, PSM Surveyor X X X X X Sabrina Baglieri Construction Services X X X X Bruce Bernard Construction Inspection X X X Sandra Lee. AICP LEED AP Biological Environmental X X Services Helen Wetherington, AICP Hurricane Recovery and CEM Debris Monitoring Services X 26. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Atlantic Isles Utility & Roadway 6 North Shore Neighborhood Improvements Improvements Miami Beach, FL Sunny Isles Beach, FL 2 Capital Improvement Program 7 City Emergency Planning Sunny Isles Beach, FL Osceola County, FL 3 NE 172nd Street & North Bay Road Roadway 8 Pembroke Pines Public Services Campus Improvements Pembroke Pines, FL Sunny Isles Beach, FL 4 SRA1A at NE 175th Median Closure Study 9 Manatee Isles Drive Roadway Improvements Sunny Isles Beach, FL Weston" FL 5 Community Enhancement Project - Phase II 10 Surfside Stormwater Master Plan Bay Harbor Islands, FL Surfs ide, FL H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. We began as M.E. Berry & Associates in 1937 and became Berry & Calvin, Inc. in 1985. Twelve years later, the transformation was made to Calvin, Giordano & Associates, Inc. (CGA). From the beginning, much of our reputation was built on repeat business with clients from the public and private sectors. Our success is reflected in the quality of work we consistently provide and also in the personal approach we take with each client. The winning combination is affirmed by the fact that CGA grew steadily during an economy that was not only challenging but also daunting to many larger firms in Florida these past few years. We focus on adding professionals and technology that address the needs of our South Florida customers instead of simply adding new branch office addresses. Founded in Hollywood, our main office is now in Fort Lauderdale, within Port Everglades. Our main operations are housed in this office although in 1993, we opened an office in West Palm Beach to better serve our growing client base north of Broward County. Today, our firm employs nearly 200 professionals that provide a broad range of planning, civil engineering, transportation/traffic engineering, surveying, permitting, environmental specialty services, landscape architecture, data technology (including Geographic Information Systems), indoor air quality, and construction services. The newest element of CGA is an Emergency Management Services division, which works together with clients to enhance their emergency management capabilities and facilitates organizational preparedness to natural disasters, homeland security, and technological threats. The firm's municipal experience in South Florida is enviable as we currently or previously served as consultants to many municipalities including West Palm Beach, Riviera Beach, Lake Park, Lantana, Parkland, North Lauderdale, Weston, West Park, Lauderhill, Sunny Isles Beach, Pembroke Pines, Miramar, Hollywood, Davie, Dania Beach, Miami Gardens, and Miami Beach. CGA also serves as district consulting engineer to the South Broward Drainage District and the South Broward Hospital District. CGA has contracts with the Florida Department of Transportation (FDOT) Districts IV and VI as well as Florida Power and Light (FPL.) In the more than 25 years that we have provided municipal engineering services, we have been retained by many clients for 10 years or longer. We feel our retention rate is because our team is always committed to providing personalized attention as well as meeting or exceeding time and budgetary requirements. As a local firm, we guarantee instant responsiveness during every phase of development or project construction. 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE I (j I) ~ I b DATE May 26. 2010 c. NAME AND TITLE Dennis J. Giordano, President L ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) RFQ # 10-04-01 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, comnlete for each snecific branch 0 Ice seekin.q work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 14. DUNS NUMBER Calvin, Giordano & Associates, Inc. 1937 FEIN 65-0013869 2b. STREET 5. OWNERSHIP 1800 Eller Drive, Suite 600 a. TYPE 2c. CITY ,2d. STATE 12e. ZIP CODE Corporation Fort Lauderdale FL 33316 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Dennis J. Giordano - President 7. NAME OF FIRM (If block 2a is a branch office) 6b. TELEPHONE NUMBER 16c. E-MAIL ADDRESS (954) 921-7781 dgiordano@caIvin-l!iordano.com 8a. FORMER FIRM NAME[Sl (Ifanv) 8b. YR. ESTABLISHED I 8e. DUNS NUMBER M.E. Berry & Associates / Berry & Calvin, Inc. 1937/1985 I 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL A VERAGE REVENUE FOR LAST 5 YEARS a. Function e. No. of Employees a. Profile e. Revenue b. Discipline b. Experience Index Number Code (1) FIRM (2) BRANCH Code r see below) 02 Administrative 24 Codes; Standards, Ordinances 1 10 Chemical Engineers 5 Construction Management 9 12 Civil Engineers 32 Cost Estimating 4 15 Construction Inspector 20 Educational Facilities 3 21 Electrical Engineers 2 Environmental Impact Studies, Assessments or 4 Statements 39 Landscape Architects 3 Hwys; Streets; Airfield Paving; Parking Lots 4 47 Planners: Urban/Regional 12 Hospital & Medical Facilities 4 52 Sanitarv Engineers Irrigation; Drainage 6 Permitting Specialists 6 Landscape Architecture 4 38 Surveyors 11 Office Building; Industrial Parks 3 60 Transportation Engineers 15 Planning (Community, Regional Areawide & 4 State) 08 Computer CADD Technicians 7 Planning (Site, Installation, and Project) 7 38 Field Surveyors 26 Sewage Collection, Treatment and Disposal 4 29 GIS/Data Technology Specialists 11 Surveying: Platting; Mapping; Flood Plain 8 Studies Code Enforcement Specialist 1 Storm Water Handling & Facilities 6 24 Environmental Specialists 2 Traffic & Transportation Engineering 3 24 Environmental Field Crew 2 Urban Renewals; Community Development 2 39 Landscape Designers/Inspectors 10 Water Supply; Treatment and Distribution 8 07 Biologist(s)/Indoor Air Quality 1 Zoning; Land Use Studies 3 Other Employees 8 Total 200 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million (Insert revenue index number shown at riqht) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million a.FederaIWork 0 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work 8 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c. Total Work 8 5. $1 million to less than $2 million 10. $50 million or greater 12. AUTHORIZED REPRESENTATIVE The fore oin is a statement of facts. a. SIGNATURE I ~ b. DATE May 26, 2010 c. NAME AND TITLE P~J:lJ:li.~J~Gi~!:~!:lJ:l~!~!:~~i.~~!!!m NON-COLLUSIVE AFFIDA VIT State of Florida) County of Broward ) Shelley Eichner, AICP and says that: being first duly sworn, deposes (I) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has submitted the attached Bid; (2) He/she is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; (3) Such Bid is genuine and is not a collusive or sham Bid; (4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a collusive or sham Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work; (5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or parties in interest, including this Affiant. ~1i- 6u< ~ Shelley Eichner, AICP "SIGNA TURE ~ AFFIANT (Printed or Typed Legal Name of Affiant) State of rLvt~y)(~ County of ~L{)L.L).'3YLL) Sworn to and subscribed before me this ,~'S day of ~\\~~ ,2010 by :2(Jc: .....-----Notary'sName Printed:Stamped or Typed ,--------- L/ Personally Known: V or Produced Identification Notary Seal: Identification Produced --..-.---------- . LORNA S. NEWTON I NoIIry Public . StIle of FIoridI I ~. .. My ComIllIaion EapIrea ApI' 3. 2011 ~ ComalIaIon . DO 820992 ~ Il:.~ BcIndId 1Ilraugh NIlIonII NoIaly A.. . ~ - - - - SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. I. This sworn statement is submitted to the City of Sunny Isles Beach by Shelley Eichner, AICP for CALVIN, GIORDANO & ASSOCIATES, INC. whose business address is 1800 Eller Drive, Suite 600, Fort Lauderdale, Florida 33316 and (if applicable) its Federal Employer Identification Number (FEIN) is 65-0013869 (IF the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: 2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287. 133(1)(b ), Florida Statutes means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry of a plea of guilty or nolo contenders. 4. I understand that an "affiliate" as defined in Paragraph 287.133(1)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity come. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(1)( e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 6. Based on information and belief, the statement which I have marked below is true in a relation to the entity submitting this sworn statement. (Please indicate which one (I) of the following three (3) statements is applicable.) -L (1) Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(2) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(3) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or agents who are active in management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. However, there has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attached is a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH I (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. 0/\L0~ [;c /~ c/ SIGNATURE OF AFFIANT Shelley Eichner, AICP (Printed or Typed Legal Name of Affiant) State of Y1{'(' ~0 f\ County off?., l{ A)-i ,,---J(}\JV~ Sworn to and subscribed before me this ./:I~:) day of J\\,~ t~) ,2010 by r=- ~~ N~e Printed, Stamped or Typed PerfO'nallY Known: ~ or Produced Identification Notary Seal: Identification Produced ..~;)!~~... LORNA S. NEWTON fm'\ NoIaIy Public . Stlt. of Florida ! . . ~ My CommIatIolI Elplres Apr 3. 2011 \~~ ill Commission , DO 620992 ""I''lf.~'\\'\ Bonded Through Nationaf NoBy Assn.