Loading...
HomeMy WebLinkAboutR.J. Behar & Co. o LIJ > i:Li trl a::: ~% ~ -C( "41 ~m ~ ~~ <.c >- C"-I Z Z >- :;:) <c en ~u.. o >- .... nO P~OOESSICJNl\L GENE~l\L ENGINEE'1ING SE'lVICE5 (:.'.ii}..~ i1FQ NO.1 0-04-01 \hJ. TABLE OF CONTENTS SECTION I 1. Transmittal Letter 2. Company Overview 3. Client References 4. Proposed Contact Person - Resume 5. Team Organization - Qualifications and Experience SECTION II / 1. Corporate Certification 2. GSA Form 330 . Part 1- CONTRACT-SPECIFIC QUALIFICATIONS . Section A-D . Section E - Resumes . Section F - Project Experience . Section H - Additional Information . Part II - GENERAL QUALIFICATIONS 3. Projects/Contacts 4. Forms: . Public Entity Crime . Non-Collusive Affidavit 5. Addenda I) R.J.Behar '~l~ R.J.~ehar & Company, Inc. ;~ I- '1 gin e e r 5 . P I ann e r 5 ._~ May 25,2010 Ms. Jane A. Hines, CMC - City Clerk City Clerk's Office City of Sunny Isles Beach Government Center 18070 Collins Avenue Sunny Isles Beach, FL 33160 RE: REQUESTFOR OUAlIFICA TIONS - RFO NO.1 0-04-01 FOR PROFESSIONAL ENGINEERING SERVICES Dear Ms. Hines: R. J. Behar & Company, Inc. (RJ Behar) is most pleased to submit five (5) sets, one (1) original and four (4) copies (unbound), of completed packages for this Request for Qualifications to provide Professional Engineering Services for Civil Engineering to serve the City of Sunny Isles Beach. RJ Behar was founded in 1999 to provide consulting services to public and private clients throughout South Florida. Our firm has grown during that period of time to 42 employees. Our steady growth has been based on providing quality services with a client service-oriented approach. In this short time, we have secured continuing service contracts with the following municipalities: the Cities of Fort Lauderdale, Coral Springs, Sunrise, Miramar, Lauderdale Lakes, Lauderhill, Miami, Hialeah, Town of Southwest Ranches, and the Town of Davie. RJ Behar also has continuing services contracts with Broward County, Central Broward Water Control District (CBWCD), Florida Department of Transportation (FOOT), South Florida Water Management District (SFWMD), Miami-Dade County, Martin County and Palm Beach County. We have assembled a team of experienced professionals to provide the City of Sunny Isles Beach with "one-stop-shopping" for its engineering needs. This team will be able to produce any size project and/or multiple projects with strict adherence to schedule, budget and quality for the City of Sunny Isles Beach. RJ Behar is a MINORITY CERTIFIED FIRM (MBE) providing engineering services in Miami-Dade County, Broward County and Palm Beach County. ACKNOWLEDGEMENT OF ADDENDA Addendum NO.1 - Mandatory Pre-RFQ Submittal Conference Summary Minutes/Onvia Notice May 12, 2010 Addendum NO.2 - Onvia Notice May18, 2010 Addendum No.3 - Onvia Notice May18. 2010 Addendum No.4 - Onvia Notice May 20, 2010 Addendum No.5 - On via Notice May 24, 2010 OFFICE LOCATION RESPONSIBLE FOR PROJECT Our office, located at 6861 S.w. 1961h Avenue. Suite 302, Pembroke Pines, FL 33332, will be responsible for this project. The contact person is Mr. Javier Rodriguez, P.E., who can be reached at (954) 680-7771, e-mail jrodriguez@rjbehar.com PERSONALIZED SERVICE The ability of a consulting firm to serve its clients is a function of the staff's experience and the philosophy of the firm. RJ Behar is proud of the technical competence of its staff and the shared commitment to quality. MR. JAVIER RODRIGUEZ, PE will be our proposed project manager and single point of contact. He has over 24 years of engineering experience, including significant experience in the design of municipal projects. He has managed numerous civil engineering projects throughout South Florida. His pro-active management style is geared towards providing the municipalities a cost-efficient, on-schedule and successful project. Mr. Rodriguez is well-versed on what it takes to coordinate an effort such as this one and understands the need to be service-oriented. As a project manager for civil engineering services, he will take an active role in ensuring quality in all of our deliverables to you. At RJ Behar. he leads our Civil Engineering Department. 686/ S. W 196 Avenue, Suite 302. Pembroke Pines, FL 33332 · Tel: (954) 680-7771 . Fax: (954) 680-7781 MR. ROBERT J. BEHAR, PE, Principal-in-Charge, has over 33 years of civil engineering experience. He has also been involved in a plethora of municipal design projects. Mr. Behar specializes in roadway geometrics and traffic operations. He also has worked in various infrastructure projects, and is very familiar with the municipal planning process. He has participated, either as a project manager or as principal in charge, in over 100 engineering projects throughout South Florida, many of which are constructed and running smoothly. MR. JUAN H. VAZQUEZ, PE, PH, BCEE will be our Quality Assurance and Quality Control Officer. Mr. Vazquez is a professional hydrologist (PH), a Board Certified Environmental Engineer (BCEE), and has more than 24 years of civil engineering experience including design of water and wastewater projects, preparation of stormwater master plans, drainage studies, street improvements, hydrologic/hydraulic (H-H) and scour studies, and utility relocations. Mr. Vazquez was the Engineer of Record for the Sistrunk Boulevard water relocation project and the Shady Banks Septic Area # 5 projects as part of the City of Fort Lauderdale Water Works program. As a QAlQC officer, he will monitor all work performed under this contract and warranty its success. COMMITMENT TO QUALITY CONTROL RJ Behar has a detailed system of checks and back-checks to ensure that our services, plans and practices reflect the highest standard of design and engineering principle. Our "we do it right" attitude and the professionalism of the RJ Behar Team will enable us to serve the City better as we will strive to exceed your expectations. Our team is most pleased to start our working relationship with the City of Sunny Isles Beach with this contract and, should we be fortunate to be selected, we will pledge to provide personalized services throughout this contract. KNOWLEDGE AND EXPERIENCE RJ Behar's principals have provided civil, transportation engineering, planning, environmental, infrastructure and construction management to South Florida clients for more than 30 years. From our project examples listed within the proposal, you will notice that RJ Behar's staff has wide experience and knowledge working on general engineering services for many municipalities. WE HOPE THAT THE ATTACHED MATERIALS WILL LEAVE YOU SHARING OUR BELIEF THAT THE INTERESTS OF THE CITY OF SUNNY ISLES BEACH AND THOSE YOU SERVE CANNOT BE BETTER FULFILLED THAN WITH OUR QUALIFIED RJ BEHAR TEAM. Sincerely, 'iEHARJ.~ bert J. Behar, P.E. President/CEO 2 2. COMPANY OVERVIEW PRCFESSIONAL GENERAL EW,.INEEHING SE'lVICES (:.'~c~~ -- .,.... / _ _ _ i1rO NO.1 0-04-01 '<~'/ R.J. Behar & Company, Inc. (RJ Behar) is a minority owned firm, currently qualified as a minority in Miami-Dade County, Broward County, Palm Beach County, South Florida Water Management District and the Florida Department of Transportation. The RJ Behar firm has developed an excellent reputation throughout South Florida for delivering high quality engineering selVices. RJ Behar performs engineering selVices for public sector clients, including state, county and municipal agencies. We have continuing contracts with the following municipalities: · T own of Southwest Ranches · Town of Davie City of Coral Springs · City of Miramar · City of Fort Lauderdale · City of Lauderhill IN-HOUSE EXPERTISE R J Behar provides selVices in the following disciplines: · Civil Engineering Stormwater Master Plan · Water Resources · Hydrologic-Hydraulic Studies · Bridge Hydraulics and Scour Analyses · Stormwater Sewer Design Sanitary Sewers and Water Distribution · Drainage Design Open Channel Hydraulics/Energy Dissipation Flood Control and Drainage Studies Injection Well Design Highway Drainage · Sanitary Sewer Collection · Spill Prevention and Best Management Practice Plans · NPDES Permitting for Construction Activities Office Location Responsible for this Project 66861 SW 196th Avenue, Suite 302, Pembroke Pines, Florida 33332 Tel: (954) 680-7771/ Fax: (954) 680-7781 Other office locations: Miami-Dade County 7850 NW 146th Street, Suite 504 Miami Lakes, Florida 33016 Tel: (305) 558-3777 / Fax: (305) 558-8909 I) R.J.Behar City of Sunrise City of Lauderdale Lakes · City of Miami · City of Hialeah City of Miami Beach South Florida Water Management District Stormwater Pump Stations · Gates/Culverts/Spillways Design · Transportation Engineering Roadway Design Traffic Engineering Traffic Calming Design · Transportation Planning · Freeway Design · Site Planning and Engineering · LAP Certification Support · Project Development & Environmental Studies · Environmental Engineering Studies · Environmental Permitting Structural Engineering (bridges and buildings) · Construction Management and Inspection Palm Beach County 12788 Forest Hill Boulevard, Suite 2003B Wellington, Florida 33414 Tel: (561) 333-7000/ Fax: (561) 333-7001 Company Overview - Page 11 P~CESSIONAL GENE"IAL eNGINEERING SERVISES (~.,..." "\ ...;" _ __ _ _ _ .:..~o No. 1 o-~~ "<.~< Financial State of Business and Financial Interest The financial state of the firm is in good standing. The revenue reports for the last two years are as follows: Year 2008 was $4,887,000 / Year 2009 was $5,818,000 Principals for the firm: Mr. Robert J. Behar, PE - President/CEO, with 79.17% of ownership 12090 SW 26th Court Davie, FL 33330 Mr. Juan H. Vazquez, PE, PH, BCEE - Vice President, with 20.83% of ownership 4301 Diamond Terrace Weston, FL 33331 II R.j.Behar Company Overview - Page 12 CLlENT REFERENCES . MR. CARL HUNTSBERGER. PE TOWN OF SOUTHWEST RANCHES 6589 SW 160tn Avenue Southwest Ranches. Florida 33331 Tel # (954) 434-0008 Fax # (954) 434-1490 E-mail: chuntsberger@southwestranches.org Proiect Completion Date: Current Various Projects within the Southwest Ranches . MR. JORGE E. HERNANDEZ CITY OF HIALEAH P.O. Box 40 Hialeah, Florida 33011 Tel # (305) 687-2668 Fax # (305) 687-2632 E-mail: jhernandez@hialeahfl.gov Proiect Completion Date: Current Various Projects within the City of Hialeah . MR. JORGE GUANCHEZ CONST. & MAINTENACE DEPT. CITY OF HIALEAH 900 E. 56th Street Hialeah. Florida 33013 Tel #(305) 687-2660 Fax # (305) 687-2642 E-mail: jgauanchez@hialeahfl.gov Proiect Completion Date: 2007 5th Street Fire Station Mezzanine Addition . MR. ARMANDO VIDAL. PE WATER & SEWER DEPT. CITY OF HIALEAH 3700 West 4th Avenue Hialeah. Florida 33012 Tel # (305) 556-3800 Proiect Completion Date: Current Utilities lor Annexation Area Phase III along NW 9J1h Avenue . MR. MARK LUBELSKI. PE CITY ENGINEER CITY OF SUNRISE 10770 W. Oakland Park Boulevard Sunrise, Florida 33351 Tel # (954) 746-3288 Fax#(954)746-3287 E-mail: mlubelski@citvofsunrise.orq I) R.J.Behar . MR. PHILL ALLEYNE DIRECTOR/OFFICE OFENGINEERING & CONST. MANAGEMENT SERVo CITY OF LAUDERDALE LAKES 4300 NW 36th Street Lauderdale Lakes. Florida 33319 Tel # (954) 676-3622 Fax # (954) 731-5309 E-mail: phila@lauderdalelakes.org Proiect Completion Date: Current City Engineer - City of Lauderdale Lakes. Florida . MR. LEANDRO ONA. PE MIAMI-DADE COUNTY PUBLIC WORKS DEPT. Highway Division Plans Review and Design 111 NW. 1st Street. Suite 1510 Miami, Florida 33128 Tel # (305) 375-1909 Fax # (305) 679-7739 E-mail: Ijo@miamidade.gov Proiect Completion Date: 2005 SW 26th Street . MS. T A TIANA ACOSTA CITY OF MIAMI Miami Riverside Center 444 SW 2nd Avenue. 8th Floor Miami. Florida 33130 Tel # (305) 416-1263 E-mail: TAcosta@miamigov.com Proiect Completion Date: 2008 Buena Vista Heights - Miami . MR. RICHARD TORN ESE. PE BROWARD COUNTY HIGHWAY & ENG. DIV. 1 N. University Drive, Suite 300 B Plantation. Florida 33324 Tel # (954) 577-4579 Fax # (954) 577-2338 E-mail: Rtornese@Broward.org Proiect Completion Date: 2005 Hollywood Boulevard at NW 28th Avenue Intersection Improvement . MR. GEORGE ROBERTSON. PE BROWARD COUNTY HIGHWAY & CONSTDIV. 1 N. University Drive. Suite 300 B Plantation, Florida 33324 Tel # (954) 577-4569 E-mail: Grobertson@broward.org Proiect Completion Date: Current Hillsboro Boulevard at Military Trail-Intersection Improvements Atlantic Boulevard at Rock Island Road - Intersection Improvements Client References- Page 11 CLlENT REFERENCES · MS. DAVID YOUNG. PE PALM BEACH COUNTY SPECIAL PROJECTS MANAGER ENG. 8: PUBLIC WORK DEPARTMENT 2300 N. Jog Road West Palm Beach. Florida 33411 Tel # (561) 684-4149 E-mail: dlvouno@pbcoov.com Proiect Completion Date: Current ~Jorth!ake Boulevard Bridge over the Loxahatchee Slough · MS. ANA ARVELO. PE FDOT DISTRICT 6 1000 NW 111th Avenue Miami, Florida 33178 T e! # (305) 470-5210 Fax # (305) 470-6725 E-mail: ana.arvelo@doLstate.fl.us Proiect Completion Date: Current NW 871h Avenue, Miami · MR. JOHN LESLIE SFWMD 3301 Gun Club Road West Palm Beach, Florida 33406 Tel # (561) 686-8800 Fax # (561) 682-6374 E-mail: jleslie@sfwmd.gov Proiect Completion Date: 2005 General Engineering Services · MR. JOSE BARRERA. PE FDOT DISTRICT 6 1000 NW 111th Avenue Miami, Florida 33172 Tel # (305) 470-5260 Fax # (305) 470-6725 E-mail: jose.barrera@dot.state.fl.us Protect Completion Date: 2005 Okeechobee Road at NW 95th Street, SW 27th Avenue and SR-94/SW 88th Street (Kendall Drive) · M R. JOSEPH BORELLO FOOT DISTRICT 4 3400 West Commercial Boulevard Fort Lauderdale, Florida 33309 Tel # (954) 777-4426 Fax # (954) 777-4482 E-mail: joseph.borello@doLstate.fl.us Proiect Completion Date: 2004 US-1 Hallandale Beach Blvd.. Andrews Avenue · MR. FERNANDO MORALES FOOT DISTRICT 4 3400 West Commercial Blvd. Fort Lauderdale. Florida 33309 Tel # (954) 777-4687 Fax # (954) 777-4482 E-mail: fernando.morales@doLstateJl.us Proiect Completion Date: 2003 Powerline Road (SR 845) Boca Raton. Florida · MR. JULIO DELGADO. PE FOOT DISTRICT 4 3400 West Commercial Blvd. Fort Lauderdale. Florida 33309 Tel # (954) 777-4390 Fax # (954) 777-4482 E-mail: julio.delgado@doLstateJI.us Protect Completion Date: Current 1-75 @ Griffin Road Interchange Broward County riI R.J.Behar Client References- Page \2 JAVIER RODRIGUEZ, PE DIRECTOR, CIVIL ENGINEERING ENGINEERING EXPERIENCE Mr. Rodriguez has extensive experience in urban and rural roadway design, including geometry, drainage, quantity computation and construction cost estimating. His expertise includes project scheduling and administration. He has served as design engineer, drainage engineer and permit coordinator as well as project manager. At RJ Behar, Mr. Rodriguez is the Director of Civil Engineering and oversees all aspects of design and construction document preparation. He has more than 24 years of experience. RELEVANT exPERIENCE Town of Davie In-House Staff Support - Town of Davie, FL Project Manager. This assignment involves serving as Town of Davie Engineering Department Staff. Town Engineer - Town of Southwest Ranches, FL Town Engineer - Responsibilities include review of all building permits, fill permits, develop cost estimates for the Town's capital improvement budget and represent the Town on all engineer matters. 1-75/Griffin Road Interchange Study - Town of Southwest Ranches, FL Develop geometric concepts for the 1-75/Griffin Road interchange. SR 7/Sunrise Boulevard Construction Inspection - City of Lauderhill, FL Project Manager - This project involved the widening and reconstruction of this major urban arterial intersection and was accomplished through an agreement between the FDOT and the City. It included extensive utility coordination, resulting from the widening of SR 7. The project also involved drainage improvements, signalization, lighting and a complex Maintenance of Traffic plan including periodic lane closures. Sistrunk Boulevard (From Federal Highway to 27th Avenue) - City of Fort Lauderdale, FL Project Manager - The scope involved streetscape, traffic calming and extensive public involvement, and water line replacement. NW 7th/9th Avenue Connector (PD&E) Study - City of Fort Lauderdale, FL Assistant Project Manager - The scope included environmental documents, alignment alternatives analysis, and corridor analysis and right-of-way relocation plan. NW 7th/9th Avenue Connector (Design) - City of Fort Lauderdale, FL Project Manager - The scope of this project includes signalization, drainage design, signing pavement marking and permitting as well as public involvement coordination. City Engineer - City of Lauderdale Lakes, FL City Engineer - The project consists of providing professional civil engineering consultation regarding plan development reviews and associated engineering activities and weekly inspection services. Citywide Resurfacing Inspection - City of Coral Springs, FL Project Manager - Supervised inspection on 15 miles of street resurfacing. Sunrise Lakes Boulevard Improvements - City of Sunrise, FL Engineer of Record - The improvements included the addition of "Valley Gutter" on the outside edges of pavement and the reconstruction of the median, milling and resurfacing, installation of new pavement markings/signage and aesthetic treatments at three intersections. Battersea and Douglas Drainage Improvement - City of Miami, FL Drainage Engineer for the drainage improvements for a residential street intersection. This project involved producing an alternative analysis and construction plans and permitting for relieving flooding at this intersection g.. r R.J.Behar & Company, Inc. ~ Engineers-Planners 6861 SW 196th Avenue, Suite 302, Pembroke Pines, FL 33332. Tel 954-680-7771 . Fax 954-680-7781 JAVIER RODRIGUEZ, PE Sunrise Boulevard and 16th Avenue - FDOT, District 4 Project Engineer - FOOT mini-contract produced complete roadway plans Bus Shelter Design-Build Criteria Package - City of Lauderdale Lakes, FL This assignment included establishing design criteria for the shelters, utility coordination, coordination with FDOT, coordination with Broward County Transit and determination of available right of way. NW 44th Street Improvements - City of Sunrise, FL Project Manager and Engineer of Record - The scope of this project consists of the enhancement of an existing swale conveyance system as well as improvements to the existing streetscape with the addition of a sidewalk feature along the project limits. Old Davie School Improvements - Town of Davie, FL Project Manager - The scope of this project consists of drainage, parking and utility improvements for an historical school (now converted to a museum) and adjacent park property. NW 87th Avenue Traffic Study - FDOT, District 6 (FM No. 405615-3-52-01) Engineer of Record - The scope included a traffic study including traffic counts to determine the optimal geometrics, traffic operations and signal warrants for 8 intersections. SR 80 (Southern Boulevard) - FDOT, District 4 (FM No. 229499-1-52-01) Project Manager. The project included roadway design, signing and pavement markings, signalization, lighting, utility relocation and landscaping and irrigation design. SR 7/Sunrise Boulevard Lighting Design - City of Lauderhill, FL Project Manager - This project consisted of roadway lighting design for SR 7 (US 441) at Sunrise Boulevard. The project also involved procuring a permit from FDOT. Town of Southwest Ranches Traffic Study - Town of Southwest Ranches, FL Project Manager/Engineer of Record . Responsible for determining the best traffic calming practices, including volume studies and speed studies. Keystone Point Neighborhood Traffic Study - City of North Miami, FL Project Manager - The study's objective was to determine the number of vehicles traveling above the speed limit and overall traffic speeds throughout the neighborhood. Central Broward Water Control District (CBWCD) Engineer Services - Broward County, FL District Engineer. Responsibilities include ensuring that all site plans comply with CBWCD engineering criteria, review and evaluate requests for variances, provide technical support to CBWCD Board during public hearings for variances request. Devine Park - Town of Davie, FL Project Engineer - Permitting entities include the Town of Davie, Central Broward Water Control District and Broward County Health Department. Hialeah Public Works Site Plan - City of Hialeah, FL Engineer of Record responsible for the site remodeling, demolition and reconstruction phase in the City of Hialeah Water and Sewer Department Complex. The project includes extensive utility coordination to coincide with construction phasing for the project, new site layout, new exfiltration trench drainage system and design of new water and sewer facilities. Tiger Tail South Side of Lake Parking. Broward College - Broward County, FL Project Manager - Design the development of a two acre recreational facility parking addition. Coral Springs Aquatic Complex Parking Lot - City of Coral Springs, FL Project Manager in charge to provide engineering design services for the addition of parking spaces. EPD (Environmental Protection Department) Laboratory Green Building - Broward County Engineering Project Manager - The scope of this project included drainage design, signage, permitting and utility coordination BC& FAU A. Hugh Adams Parking Garage - Davie, FL The scope of this project consists of civil engineering services for the design-build team for a 5 story 1000 vehicle parking garage located in the Broward College Davie campus. Welleby Park Expansion - City of Sunrise, FL Project Manager in charge of the coordination with the City of Sunrise for the location and design of the concrete pads for the "Life Trail" ADA accessible well ness/exercise stations. Sunrise Athletic Complex, Additional Parking - City of Sunrise, FL Project Manager/Engineer of Record for the addition of parking spaces at the Sunrise Athletic Complex within the City of Sunrise. II R.J.Behar & Company, Inc:. Engiceers.Planners PAGE 2 z o ~ ON W _ OOZ 0<( 0..." 00: 0:0 0...2 <( W I- Vl Z o !<cT"" U9 -'l:!" !::o ...J, <:(0 ::::>T"" d. o a:::z 0_ LL..d r-LL.. Vla::: lJJ - ::::> d lJJ a::: 00 W U - ....J> <(0: Zw 000 en" OOz W - LLO: OW o:W o...~ " z W w Cl.. ..: C'C:l .c CI) a:l -::J 't: CI) .c o ex: w Cl.. N CI) ::I C) Oi:: '0 o ex: ~ CI) "S: C'C:l -::J WCl.. o<c -c w WWWCl.. Cl.. en w _ -::E ...J 0 ~ - -c >-.!!WC'C:l OCCl..O a:lo.:o - c.. Gi '0 ::E~3:~ 'O<coc -- z ~ > c CI) C'C:l CI) >- u. cE= ~ CI) ~::.::: W Cl.. cnww ::E af 0' O'(j)g C C C'C:l C'C:lC'C:l_ E'O 0 0:5Cl.. ex:_g . CI) _ ,.. C'C:l_ ......-C'C:l 'OC'C:lc -- ex: > C'C:l C W wCl.. w ~<c -c en ::J:w ::Eo Cl..w_ -x -...J (5 f! 1ii ~ ui a:l -(i) Cl.. - Cl.. "E 5- >- :11 -=- ~ CI) -(i) ::I CI) U en C) C" 3: -- C'C:l ::I ~oex:~en >z -g ">- C'C:l ::J:= en C CI) C'C:l::'::: ::I -::J Cl.. <cw W C en- __ f! Cl..w -c::I -W:Ew:= C) N...J -..;- 0 CI) ~ - f! -C :::: en C) W O(i) ::I ~ 0 -i:: Cl.. ::I Cl.. en '0 'O':C"ccc o Gi CI) C'C:l __ C'C:l ex:3:en.c'i::E ~OC'C:lO~CI) _!!! z .g ex: ,.;:; ::J: > >- c C'C:l_ C'C:l -::JGien ~ ::E Cl.. o W _ Oww I- Cl.. en Cl.. _::I -.:!! E WCI)C'C:l ~~...J ~b~ 2 u.: o~ C'C:lc'O ~C'C:l~ (1)CI)_ ceno Gi C'C:l - C'C:l ex: W- ....w_ w.... -w N ~-c:l1.:.E~ f!f!Ciiu.:.:: ~==NCI)<c 2<cg:8(1) ~::>c:Ja:~ ,.;:; >- C'C:l fI) C fI) C C C C'C:l 00 C'C:l C'C:lZ ea-Si;::J: o~<c or- (l) 0) co CL (l) (.) c (l) (l) Cl.. X W ~ en c o co u co ~ a I c o co N C co 0) "- o E co (l) I-- - -- -.. E~ CORPORATE CERTIFICATION I State of Florida Department of State I certify from the records of this office that RJ. BEHAR & COMPANY, INC. is a corporation organized under the laws of the State of Florida, filed on October 4, 1999. The document number of this corporation is P99000088184. I further certify that said corporation has paid all fees due this office through December 31, 2010, that its most recent annual report was filed on February 9, 2010, and its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the GreaJ Seal of Florida. aJ Tallilhassee. the CapitaL this the .Yinth day of February. 2010 ~"6 SecretalY of State Authentication ID 200168350332-020910-P99000088184 To authenticate this certificate. visit the followlIl!! site. enter this ill, and then follow the instructions displayed - bttps:f fefile.sun biz.orglcertau th "er.b tm) IJ R.J.Behar Corporate Certification- Page 11 ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) PROFESSIONAL GENERAL ENGINEERING SERVICES - CITY OF SUNNY ISLES BEACH MIAMI-DADE COUNTY, FLORIDA 2. PUBLIC NOTICE DATE 04/26/2010 3. SOLICITATION OR PROJECT NUMBER RFQ No. 10-04-01 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Robert J. Behar, PE - President/CEO 5. NAME OF FIRM R.J. BEHAR & COMPANY, INC. 6. TELEPHONE NUMBER (954)680-7771 7. FAX NUMBER (954) 680-7781 8. EMAIL ADDRESS bbehar@rjbehar.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) cc 'CC W W ZO ::;;;: >Z 01- ,I- C>C> cc -'cc CJ<l: D.. <l: ~cc D.. ({JI- 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 General Engineering Services D CHECK IF BRANCH OFFICE Pembroke Pines, FL 33332 a. X D CHECK IF BRANCH OFFICE b. o CHECK IF BRANCH OFFICE c. o CHECK IF BRANCH OFFICE d. o CHECK IF BRANCH OFFICE e. o CHECK IF BRANCH OFFICE f. D CHECK IF BRANCH OFFICE q. D. ORGANIZATIONAL CHART OF PROPOSED TEAM D (Attached) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PART 1- PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE ROBERTJ.BEHAR,PE PRINCIPAL IN CHARGE a. TOTAL 33 b. WITH CURRENT FIRM 10 15. FIRM NAME AND LOCATION (City and State) g R.J. BEHAR & COMPANY, INC. !a 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineering, 1974 M.E. Civil Engineering, 1975 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 1980/Professional Engineer #21755 Florida 1997/ Professional Engineer #19836 Kentucky 1997/Professional Engineer #6201043655 Michigan 1997/Professional Engineer #E-62643 Ohio 1997/Professional Engineer # 19800047 Indiana 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Behar is the President of R.J. Behar & Company, Inc. He has over 33 years of experience in planning and design of engineering projects. He has also been involved in many municipal projects throughout Florida. He has extensive management experience, having managed over 65 engineering projects. Mr. Behar's experience covers transportation, airports, general civil and structural design. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED \-75/ Griffin Road Interchange - FOOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm Mr. Behar served as Principal in Charge for the traffic study to convert the existing rural interchange to a modified urban interchange. Services include all the traffic modeling and the preparation of an Interchange Operation Analysis Report. The scope of services includes roadway a. improvements, drainage, permitting, bridge, structural, signing & pavement markings, signalization, lighting, landscaping and traffic analyses. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 932/49th Street (NW 103rd Street from W. 2nd Avenue to E. 10th PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Avenue) - FOOT, District 6 2006 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm QAlOfficer in Charge. Project consists of milling and resurfacing and ADA pedestrian ramp upgrades, length: 1.576 miles. RJ Behar produced all b. the roadway design plans, pavement marking & signing, lighting, drainage, utility coordination and permitting. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Atlantic Avenue (SR 806) Palm Beach County, Florida - FOOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm Principal-in-charge for the resurfacing (RRR) of a 3 mile section from Via Flora to Congress Avenue. The scope of this project consisted of complete design of resurfacing 2.8 miles of a major arterial roadway including drainage improvements, pavement marking and signing, lighting plans, eight signal locations, public involvement program and landscape improvements. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR A1A Resurfacing (RRR) - FOOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, ete.) AND SPECIFIC ROLE [8J Check if project performed with current firm Principal in Charge for the resurfacing plans for 5 miles of rural roadway from the Boynton Inlet to Lake Worth Road. The scope of services included roadway design, drainage studies, drainage design, pavement marking and signing plans, signal plans, bridge plans, public involvement and lighting plans, mitigation plans and permitting. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED NW 7th/9th Avenue Connector (Design) - City of Fort Lauderdale, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm Principal in Charge - The project includes the roadway design of a 1.5 mile urban section, 4-lane divided, connector between NW 7th and NW 9th Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing pavement marking and e. permitting as well as public involvement coordination. STANDARD FORM 330 (1/2004) PAGE 1 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE JAVIER RODRIGUEZ, PE ENGINEER OF RECORD/PROJECT MANAGER/CIVIL & SITE ENGINEERING a. TOTAL 24 b. WITH CURRENT FIRM 5 15. FIRM NAME AND LOCATION (City and State) E1 R.J. BEHAR & COMPANY, INC. ra 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineer, Florida International University, 1987 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 1993/Professional Engineer # 48264 Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Rodriguez has more than 24 years of civil engineering experience, including significant experience in the design of Broward College projects. He has ex1ensive experience in urban and rural roadway design, as well as geometry, drainage, quantity computation, construction cost estimating, project scheduling and administration. At RJ Behar, Mr. Rodriguez is the Director of Civil Engineering and oversees all aspects of design and construction document preparation. He has also served as design engineer, drainage engineer, and permit coordinator as well as project manager. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Sunrise Athletic Complex Additional Parking PROFESSIONAL SERVICES I City of Sunrise, FL Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Project Manager/Engineer of Record who provided engineering design services for the addition of parking spaces at the Sunrise Athletic Complex a. within the City of Sunrise (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hialeah Public Works Site Plan PROFESSIONAL SERVICES I City of Hialeah, FL 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Engineer of Record responsible for the site remodeling, demolition and reconstruction phasing of the City of Hialeah Water and Sewer b. Department Complex. The project includes ex1ensive utility coordination to coincide with construction phasing for the project, new site layout, new exfiltration trench drainaoe system and desion of new water and sewer facilities to service site. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Battersea and Douglas Drainage Improvement PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) City of Miami, FL 2006 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Drainage Engineer for the drainage improvements for a residential street intersection. This project involved producing an alternative analysis and construction plans and permitting for relieving flooding at this intersection. It also included permitting for the improvements. The selected c. alternative included the use of injection wells and uporadino of existino storm sewer system and outfall. (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED Devine Park PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Town of Davie, FL On-going (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Project Engineer - The Town of Davie contracted RJ Behar to convert a portion of the Devine Estates Tree Nursery into an equestrian park. Site elements include multi-use pedestrian/equestrian trails, a gazebo overlooking the existing pond, design of a drainfield for the proposed d. bathrooms, horse trailer parking and staging area for patrons with enclosure of the remaining tree nursery with associated maintenance access. Permitting entities include the Town of Davie, Central Broward Water Control District and Broward County Health Department. (1) TITLE AND LOCATION (City and State) I:2)YEAR COMPLETED SR 7/Sunrise Boulevard Construction Inspection PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) City of Lauderhill, FL 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Project Manager for the Construction Engineering Inspection Services for this intersection improvement project in the City of Lauderhill. This project involved the widening and reconstruction of this major urban arterial intersection and was accomplished through an agreement between the FDOT and the City. It included extensive utility coordination, resulting from the widening of SR 7. The project was under FDOT oversight as SR 7 is a state road. The project also involved drainage improvements, signalization and lighting. The project required a complex Maintenance of e. Traffic plan includinq periodic lane closures. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE JUAN H. VAZQUEZ, P.E., P.H., BCEE WATER AND SEWER a. TOTAL 24 b. WITH CURRENT FIRM 9 15. FIRM NAME AND LOCATION (City and State) g R.J. BEHAR & COMPANY, INC. !t;J 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S., Civil Engineering, University of Puerto Rico, 1985 Continuing education courses in Hydrology/Hydraulics, Bridge Scour, Everglades Restoration, Pumps Station Design and Wastewater Treatment Design. 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) State of Florida, P E . License No. 51143 State of Virginia, P E - License No.0402 025604 Puerto Rico, P E - License No. 11385 State of Michigan, P E - License No. 46482 Professional H drolo ist - License No. 05-H-1653 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Vazquez is Vice President of R.J. Behar & Company, Inc. He has over 24 years of experience in planning and design of civil engineering projects. He has also been involved in civil/drainage improvement projects throughout Florida, Puerto Rico, New York, Virginia, Arkansas, Idaho and Pennsylvania. He has also experience in water and sewer major drainage projects, hydrologic-hydraulic studies, stormwater master plans, bridge hydraulic & scour analyses, and environmental projects. He has designed sanitary and storm water pump stations, sanitary collection systems as well as water distribution systems. His modeling experience includes Hec-1, Hec-2, HEC-RAS, SPWMM, AdICPR, ASAD and others. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED Northlake Boulevard Bridge over the Loxahatchee Slough PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Palm Beach Count , FL - FDOT District 4 On-going (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Drainage Engineer responsible for the drainage design and permitting. This project is for the construction of a new bridge over the Loxahatchee Slou h. Sco e of services includes roadwa im rovements. (1) TITLE AND LOCATION (City and State) Powerline Road (SR 845) 3R Palm Beach County - FDOT District 4 2 YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2004 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Project Manager in charge of the 3R rehabilitation project. The project includes major culvert replacement, milling and resurfacing, 8 signals, b. brid e improvements and si nin and markin lans. Prepared maintenance of traffic plans. (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED North County Neighborhood Improvement Project - Water and Sewer - PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Broward Count , Florida On-going (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Mr. Vazquez serves as Project Manager/Engineer of Record for this project. The scope of the project consists of providing drainage design; cost estimating of drainage system; permitting of drainage system; and peer review of: water distribution plans, sewer distribution plans, water reuse master plan, water reuse design, streets and sidewalks plans. The peer reviews are being performed at each phase of design. RJ Behar will also be providin construction mana ement and inspection services durin the construction. (1) TITLE AND LOCATION (City and State) Shady Banks Septic Tank Conversion Project Cit of Fort Lauderdale, FL c 2 YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm d. Pro'ect Mana er/En ineer of Record for conversion of a nei hborhood from se tic tank to sanita sewer s stem. (1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED Neighborhood Improvement Projects, La Gorce, West/Bay Road Avenue PROFESSIONAL SERVICES CONSTRUCTION (If applicable) and Nautilus 2007 Cit of Miami Beach, FL (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Drainage Engineer. This project consisted of rehabilitation and resurfacing the Blue Heron Boulevard from Avenue S to Dixie Highway. Drainage design included review of the project history, site evaluations and development of the scope for 3R improvements. e. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) DRAINAGE/PERMITTING 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 25 1 12. NAME DAVID M. BOYER, PE 13. ROLE IN THIS CONTRACT 15. FIRM NAME AND LOCATION (City and State) g R.J. BEHAR & COMPANY, INC. fa 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B. S. Environmental Engineering, University of South Florida, Tampa, FL - April 1985 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer # 43226 Florida Professional En ineer # 34591 Washin ton 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) Mr. Boyer has over 25 years of experience including expertise in storm water management and treatment system design, highway, municipal and private drainage design and project management. Mr. Boyer also has an ex1ensive background in roadway drainage design and permitting projects for the Florida Department of Transportation (FOOT), on multiple Interstate and Turnpike roadway widening. He also has experience in drainage design on several airport projects, such as the Miami International Airport and the Fort Lauderdale-Hollywood International Airport. At RJ Behar, he is the Water Resources Director. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Roebuck Road From SR 7 to Jog Road - Palm Beach County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm Lead Drainage Engineer responsible for complete drainage design of this proposed roadway on a new alignment. The drainage design a. Included storm sewer design, stormwater management ponds, and connections to adjacent subdivisions, water quality treatment system and permittinq. This proiect was desiqned to 60% plans before permitting halted the proiect. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 71 O/Beeline Highway Design (East and West) - FDOT District 4 PROFESSIONAL SERVICES T CONSTRUCTION (If applicable) 2005 Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm Senior Drainage Engineer for the design of two new construction/widening projects. The combined length of both projects is 5.33 miles. The western project consists of the addition of two new lanes to provide a four-lane divided rural roadway, along with the replacement of the existing two-lane bridge and the construction of a new two-lane parallel bridge. The eastern project consists of the new construction to provide a four-lane b. divided urban roadway. Responsible for the drainage design, stormwater management, and permitting. Also obtained a water use permit for irrigation from wells, and provided post construction drainage services. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED SR 80 Design West, East of Kirk Road to west of Haverhill Boulevard, West Palm PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Beach, FL - FDOT District 4 2009 Current (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm Senior Drainage Engineer responsible for all drainage aspects for team providing the complex engineering design and permitting services for SR 80 from west of Haverhill Road to East of Kirk Road. The project was designed with eight lanes and a grade-separated interchange at Military Trail and Haverhill Road. Program included five bridges with retaining walls and a 2,500-foot bulkhead along the north side of the C-51 Canal. Also c. ,provided post construction drainaqe services. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED SR 5/US 1 Improvement - FDOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm Senior Drainage Design Engineer on this 2.9-mile road improvement project in St. Lucie County. Analysis involved exfiltration trench design, storm sewer design and analysis, cross-drain analysis, and coordination with St. Lucie County on the design of three regional stormwater ponds. d. Responsible for all drainage permitting. Also provided post construction drainage services. (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED 1-595 Final Design - FDOT District 4 (AECOMlDragados) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Water Resources Director responsible for the overall drainage master plan update, complete drainage design for the entire corridor which includes exfiltration trench, storm sewer design and analysis, cross-drain analysis, and both wet and dry retention stormwater management designs for e. seven out of eight design zones. He is also responsible for drainage plan preparation for two roadway design sections, as well as all coordination between six different design firms. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) TRAFFIC ENGINEERING 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 37 <1 12. NAME RAFAEL DE ARAZOZA, PE, PTOE, CPM 13. ROLE IN THIS CONTRACT 15. FIRM NAME AND LOCATION (City and State) .:1 R.J. BEHAR & COMPANY, INC. W 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) . Miami-Dade College, Miami, Florida, ASCET . Florida International University, Miami, Florida, BSCET . Florida State University/FOOT, Certified Public Manager (CPM) . Bar Universi ,Miami, Florida, Master of Arts in Pastoral Minist 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. De Arazoza has 37 years of transportation planning and traffic engineering experience. He has worked for both the private sector and governmental agencies, including FOOT and Broward County. Mr. De Arazoza has held many high level management positions throughout his career. He is also well-versed in traffic engineering design standards and procedures. 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) . P. E. Florida License No. 24487/1980 . Professional Traffic Operations Engineer (PTOE) . Certified Public Manager (CPM) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED SR 836/SR 826 (Section 5) Plans Review - EAC Consulting (MDX) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Project Manager - In charge of reviewing the complex Interchange Guide Sign plans covering aspects such as size of lettering, symbols, required legend, sign locations, etc. to conform with the requirements of the Manual of Uniform Traffic Control Devices (MUTCD) and applicable FDOT regulations and standards. a. (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED SR 874/Don Shula Expressway Ramp Connector to SW 136th Street - Project PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Development and Environment (PD&E) Study Current (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Project Manager - In charge of the required traffic engineering analyses and the development of major documents, such as the Interchange Modification Report (IMR) and the Design Traffic Technical Memorandum (DTTM). b. (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED Transportation Planning & Traffic Engineering Consulting Services Contact, PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) Town of Cutler Bay, Florida Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm Performed work consisting of traffic engineering, traffic calming and safety studies as well as reviewing traffic impacts of proposed land developments. Traffic engineering work included capacity/level-of-service analyses, traffic signal warrant studies, intersection and arterial studies, safety studies, potential impacts of proposed land use developments. He successfully developed traffic calming and traffic engineering studies for c. the Town. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Transportation Master Plan and Transportation Concurrency Management Areas PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) I (TCMAs) - City of Miami Gardens, Florida 2006 (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE D Check if project performed with current firm Complete development of the Transportation Master Plan including public involvement, analyses of existing and future conditions of the transportation system; development of transportation improvement projects addressing not only roadways but multi-modal projects as well. He developed an implementation plan including existing available and forecasted transportation funds. He received approval by the City Council and the Metropolitan Planning Organization (MPO) process, developed a citywide TCMA's system as part of the concurrency management system and d. identified the needed improvements to address traffic impacts. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED District Six Planning Manager - FDOT District 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2004 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm During his employment with FOOT Mr. De Arazoza held management level positions such as District Planning Manager, Assistant District Traffic Operations Engineer and District Traffic Design Engineer among others. His responsibilities included transportation planning functions and related programs, grow1h management, traffic operations and safety studies, traffic regulatory; roadway design, project development and public e. involvement. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME CARLOS MAZORRA, PE 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE ROADWAY DESIGN a. TOTAL 22 b. WITH CURRENT FIRM 6 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. riI 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B. S. Civil Engineering, University of Miami, 1983 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer! Florida #42653 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Mazorra has been the Project Engineer for the preparation of numerous, very successful highway construction plans. This included design of horizontal and vertical geometry with GEOPAK software; drafting plan, profile, cross sections, traffic control and various ancillary roadway plan sheets using Micro Station software; design of roadway signal plans in collaboration with traffic engineering and structural engineering personnel. He also has 11 years of experience as an FOOT employee and knows the policies and needs of the FDOT from both a technical and managerial perspective, and can thereby assure the success of any project. He has 22 years of experience. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED NW 44TH Street - City of Lauderdale Lakes, Florida PROFESSIONAL SERVICES -, CONSTRUCTION (If applicable 2006 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Project Manager Engineer - Construction of a new 4-lane median divided facility. The project includes roadway plans, drainage plans, privacy a. walls plans, permittinQ, utilitv coordination, and inspection services. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Atlantic Boulevard/Rock Island Road Intersection Improvement - Broward County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Engineering 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Project Manager -He prepared traffic study, roadway plans, signalization plans, signage plans, drainage plans, and utility coordination for a major intersection improvement. The scope of the project included improvements to Atlantic Boulevard and Rock Island Road intersection. It consists of b. the construction of a westbound left turn lane, westbound right turn lane, and dual left-turn lanes on all four legs. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hillsboro Boulevard/Military Trail Intersection Improvement - Broward County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Engineering 2005 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Project Manager - He prepared the traffic study, roadway plans, signalization plans, signage plans, drainage plans, and utility coordination for a major intersection improvement. The scope of the project included improvements to Hillsboro Boulevard (SR 810) at Military Trail intersection. Military Trail is a four-lane, urban. divided, north-south collector. There are two through lanes with double left turn lanes and an exclusive right turn lane at each approach to the intersection. Hillsboro Boulevard is six-lane, urban, divided, and arterial; with double left and exclusive right c. turn lanes at each approach to the intersection. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hollywood Boulevard/N. 28th Avenue Intersection Improvement - Broward County PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) Engineering 2006 (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Project Manager - He prepared the traffic study, roadway plans, signalization plans, sign age plans, drainage plans and utility coordination for this d. major intersection improvement. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Powerline Road (SR 845) Palm Beach County - FOOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable 2004 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Project Engineer for signal design. The project includes milling and resurfacing 3 miles of major collector, 8 signal upgrades, safety e. improvements and miscellaneous drainage improvements. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) TRAFFIC ENGINEERING a. TOTAL 28 14. YEARS EXPERIENCE b. WITH CURRENT FIRM 4 12. NAME SEAN F. O'KEEFE, PE 13. ROLE IN THIS CONTRACT 15. FIRM NAME AND LOCATION (City and State) EJ R.J. BEHAR & COMPANY, INC. ~ 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. / 1981 / Civil Engineering 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer # 41766 Florida Professional Engineer # 7674 California Professional Engineer # 33030 New Jersey Professional Engineer # 51778 Utah Professional Planner # 3923 New Jerse 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. O'Keefe has twenty-eight years experience in the project management, planning, design, and construction of large civil engineering projects. Mr. O'Keefe has considerable project-infrastructure support experience in drainage, sewer, utility relocations, lighting, structures, site development, landscaping and survey. Mr. O'Keefe has integrated an effective blend of traffic analysis and traffic operations improvements in all of his projects, including signing, striping and signalization. Many of his projects have involved feasibility, environmental investigations, and planning studies as well as value analysis of alternatives. Mr. O'Keefe has completed training for Maintenance of Traffic plans preparation for FOOT. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 1-75/Griffin Road Intersection Traffic Study - FOOT, District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Project Manager. The study consisted of the preparation of an Interchange Operational Analysis Report (IOAR) for the interchange at Griffin Road and 1-75 in Broward County to assess the existing and future traffic operations of the interchange for an interim solution given a No-Build scenario and up to five (5) Build scenarios. The study included signalized intersection analysis, weaving analysis, queuing analysis, ramp analysis, interchange capacity analysis and crash analysis. The study was done using the latest traffic software such as CORSIM, SYNCHRO and a. FSUTMS/CUBE. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED NW 107th Avenue Feasibility Study - Miami-Dade Public Works PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2006 (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Project Manager. Project consisted of a Feasibility Study of Corridor Extension including traffic operations plan, analysis of level of service and potential traffic signal operations, turn movements and signal timings for numerous intersections. FSUTMS was used to forecast the volumes, b. which were then analyzed in SYNCHRO to obtain the operational characteristics of the rojected roadway. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED NW 87th Avenue. Traffic Study - FOOT, District 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2006 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm c. Traffic Engineer responsible for traffic analysis and level of service study for new route with six signalized intersections (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Flying Cow Road Roundabouts - Village of Wellington, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2006 (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Project Manager. RJ Behar prepared layout of two roundabouts for the Village of Wellington along Flying Cow Road for future traffic calming. The preparation of the two roundabouts was based on Palm Beach County roadway design criteria and developed for right-of-way dedication by the adjacent property owners, in this case South Florida Water Management District (SFWMD). d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR A 1 A - FOOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm As utility coordinator for the RRR project, Mr. O'Keefe was involved in the development of utility relocations with respect to the proposed drainage facilities along the narrow and environmentally sensitive roadway. Mr. O'Keefe was responsible for negotiating and obtaining all utility agreements for the facility relocations with the affected UAO's using District 4 procedures. Mr. O'Keefe assisted with the design of several special conflict e. drainage structures. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME ANTHONY V. ALFRED, PE 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE ROADWAY DESIGN a. TOTAL 18 b. WITH CURRENT FIRM 4 15. FIRM NAME AND LOCATION (City and State) g R.J. BEHAR & COMPANY, INC. !fI 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S., Civil Engineer, Florida International University, 1991 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer/ Florida #51857 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Alfred has ex1ensive experience in transportation design engineering. He is well-versed with the FDOT design and plans preparation process. He has participated in public involvement, and utility coordination process for FOOT projects. He proficiently uses and trains staff on how to use Microstation V 8 /GEOPAK running the FOOT Site-Menu. He is certified in maintenance of traffic plans preparation for FOOT. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED SW 328 Street From SW 152 Ave. to SW 137 Ave. - Miami-Dade County Public PROFESSIONAL SERVICES T CONSTRUCTION (If applicable) Works On-going (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Mr. Alfred served as Senior Project Engineer. The scope of the project included master planning and feasibility analysis for the new roadway. This project involved the upgrading of the existing traffic signals to mast-arms and internally illuminated signs. The design phase for this project a. comprised of drainage, lighting, signalization, signing and pavement markings. (1) TITLE AND LOCATION (City and State) . 12\ YEAR COMPLETED Hillsboro Boulevard/Military Trail Intersection Improvement - Broward County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Engineering 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Mr. Alfred served as project engineer. Prepared roadway plans, signing and pavement marking plans, drainage plans, and utility coordination for b. this major intersection improvement project. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Downtown Miami Storm Sewer Project (North Bayshore Drive) - City of Miami, PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) Florida 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm The project consisted of a total reconstruction of the roadway, and the design and implementation of a drainage system, which included the replacement of the subsurface drainage system. Also as a part of the stormwater management system drainage wells were utilized to assist in alleviating flooding. The project required drainage calculations for approval from Miami-Dade County Department of Environmental Management (DERM). Mr. Alfred served as quality control engineer. c. (1) TITLE AND LOCATION (City and State) /2\ YEAR COMPLETED Miami River Greenways, Segment D - City of Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) On-aoina (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm Project Manager - The project consists of the reconstruction of an existing roadway segment along the Miami River to produce a scenic, landscaped, pedestrian/bicycle walkway/greenway. The project includes the design of a drainage system with wells, d. decorative lighting and landscape/hardscape design. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED SR-50 Roadway Rehabilitation, Vero Beach, FL - FOOT, District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm Project Engineer/Utility Manager - He prepared all engineering plans phase submittals for a 1 mile section of a 6-lane divided urban arterial roadway, which included roadway plans, typical sections, drainage plans, traffic control plans, signing/marking plans and a computation booklet. He functioned as the utility manager and prepared the resurfacing, restoration and rehabilitation report. e. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME DAVID ROMANO, PE 13. ROLE IN THIS CONTRACT CONSTRUCTION/PROJECT MANAGEMENT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 14 3 15. FIRM NAME AND LOCATION (City and State) g R.J. BEHAR & COMPANY, INC. !t;I 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) M, S.1Construction Management B, S.1Civil and Architectural En ineerin 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Romano is a licensed Professional Engineer with a Master of Science degree in Construction Management and has over 14 years of experience specializing in the areas of Construction Engineering, Inspection, and Management (CEI&M). He has worked as a Senior Project Engineer/Project Engineer on various roadway construction projects in Miami-Dade, Broward, and Palm Beach Counties for Districts 4, 6, and Turnpike, with an aggregate dollar value of over $100 million. Mr. Romano is responsible for overseeing the construction operations, administration, management, quality control, and monthly and final estimates (close-out package) of the projects. His knowledge includes all facets of CEI responsibilities including the oversight of construction operations, administration, public relations, quality control, final estimates, and claims analysis. 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) P.E. Florida License No. 63817/2006 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pines Boulevard (SR-820) and 1-75 (SR-93) Interchange CEI - City of Pembroke PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Pines, FUFDOT, District 4 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE IRICheck if project performed with current firm Senior Project Engineer on this ($11.2 Million) Local Agency Program (LAP) project between the City of Pembroke Pines and the Florida Department of Transportation, District 4. This is a federally funded project consisting of urbanized improvements at the 1-75 (SR-93) and Pines Boulevard (SR-820) Interchange. The project includes modifying the existing interstate overpass, entrance and exit ramps from a rural configuration to an urban configuration, as well as widening, signalization, landscaping, and access management improvements along Pines Boulevard. "No-excuse Bonus" (250K) and "Incentive/Decentive" contracting method utilized. a. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Emergency Water Main Repair - City of Pembroke Pines, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE IRI Check if project performed with current firm Senior Project Engineer of full construction management services for the emergency repair of a 16" PVC transmission water main that ruptured along Pines Boulevard, east of 145th Avenue in the City of Pembroke Pines. The project consisted of the replacement of 20 If. of a 16" PVC water main with 16" DIP retrained sleeve pipe, fire hydrant installation for flushing and testing, backfill and compaction following FOOT specifications. b. (1) TITLE AND LOCATION (City and State) l2lYEAR COMPLETED SR 811 (NE 4th Avenue) from Sunrise Boulevard to South Fork of Middle River, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Fort Lauderdale, FL - FDOT, District 4 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE IRI Check if project performed with current firm Senior Project Engineer responsible for the milling/resurfacing of NE 4th Avenue ($1.8Million); including drainage, pavement markings, c. signalization, raised median, sidewalk, curb & gutter, landscapinq and irriaation. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 5 (Federal Highway) from Sunrise Boulevard to Oakland Park Boulevard, Fort PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Lauderdale, FL - FDOT, District 4 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE IRI Check if project performed with current firm Senior Project Engineer responsible for the milling/resurfacing and widening of Federal Highway ($7.7 Million); including reconstruction of 13th street, repairs to the Middle River Canal Bridge, drainage, pavement markings, traffic separator, raised median, signalization, utility relocation, sidewalk, curb & gutter, bus pads, landscaping, and irrigation. "No-excuse Bonus" (310K) with an "Incentive -Decentive" contracting method utilized. d. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME KELLY NOWELL, PE, LEED-AP WATER/SEWER/DRAINAGE & PERMITTING/CIVIL &SITE ENGINEER 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 5 1.5 13. ROLE IN THIS CONTRACT 15. FIRM NAME AND LOCATION (City and State) g R.J. BEHAR & COMPANY, INC. !L;;I 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. in Civil Engineering, Florida International University/2005 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 2010/Professional Engineer # 70632 Florida US Green Buildin Council LEED Accredited Profession 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, etc.) Ms. Nowell is a civil engineer with 5 years of experience. She is responsible for engineering design and plan preparation in support of private land development and public infrastructure projects. Areas of design include stormwater management systems, storm sewer systems, potable water distribution systems, gravity sanitary collection systems, lift stations and force main transmission systems. Plan preparation skills include master plans; paving, grading and drainage plans; utility plans; plan and profiles; signing and marking plans; environmental plans; construction details; SWPPP plans. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) Central Broward Water Control District Engineer - Permit Review 2 YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Current [K] Check if project performed with current firm 2 YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Current [K] Check if project performed with current firm rovements for the new lar e ark. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Current [K] Check if project performed with current firm of 8.0 +/- acre park. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) ROADWAY DESIGN a. TOTAL 5 14. YEARS EXPERIENCE b. WITH CURRENT FIRM 5 12. NAME HANS RIBBECK, PE 13. ROLE IN THIS CONTRACT 15. FIRM NAME AND LOCATION (City and State) g R.J. BEHAR & COMPANY, INC. !Ell 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S., Civil Engineering, Florida International University, 2005 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 2006/ En ineer Intern/No. 1100011055/ Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) At RJ Behar, Mr. Ribbeck is a Project Engineer in charge of design and plans preparation of roadway projects, drainage plans, signing and pavement marking plans, signalization plans, and permitting package. He has five years of experience. CONTINUING EDUCATION 2007 FOOT Advanced Geopack for Roadway Designers 2006 FOOT Basic Geopack for Roadway Designers 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) l2\YEAR COMPLETED SW 176TH from SW 107TH Avenue to US 1, Miami, Florida - Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable) County Public Work 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Project Engineer - He prepared the roadway plans. The scope includes reconstruction of SW 176th from SW 107th Avenue to US 1 in Miami, a. Florida. The project includes roadway plans, drainaoe, traffic, and sionino and markino plans. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Atlantic Avenue (SR 806) - FDOT District 4 PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm The scope of this project consists of complete design of resurfacing 2.8 miles of a major arterial roadway, including drainage improvements, pavement marking and signing, lighting plans, eight signal locations, public involvement program and landscape improvements. Mr. Ribbeck b. served as project engineer in charge of preparation of roadway plans, signing plans drainage, signal plans, utility coordination and permitting. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Buena Vista Heights - City of Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Project Engineer for the design and production of roadway, drainage, signing and pavement marking plans and the permit package. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Downtown Miami Storm Sewer Project (North Bayshore Drive) - City of PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Miami, Florida 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Project Engineer. He prepared roadway plans, pavement, and marking & signing plans. The project consisted of a total reconstruction of the roadway, and the design and implementation of a drainage system which included the replacement of the subsurface drainage system. Also, as d. a part of the stormwater management system, drainage wells were utilized to assist in alleviating flooding. The project required drainage calculations for approval from Miami-Dade County Department of Environmental Manaoement (DERM). (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Military Trail at Hillsboro Avenue Improvements - Broward County PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Engineering 2005 (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Project Engineer for the preparation of roadway plans for milling and resurfacing and median safety improvements. The scope of the projec included improvements to Hillsboro Boulevard (SR 810) at Military Trail intersection. Military Trail is a four-lane, urban, divided, north-sout~ collector. There are two through lanes with double left turn lanes and an exclusive right turn lane at each approach to the intersection. Hillsborc e. Boulevard is a six-lane, urban, divided, and arterial; with double left and exclusive right turn lanes at each approach to the intersection. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME FERNANDO CANO, PE 13. ROLE IN THIS CONTRACT DRAINAGE/PERMITTING 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 5 1 15. FIRM NAME AND LOCATION (City and State) I) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B. S. Civil Engineering, University of Florida, Engineer Intern, Florida License No. 1100008957, Gainesville, Florida December 2003 Feb 21, 2004 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) At RJ Behar, Mr. Cano works in the Water Resources Group and his responsibilities include design and modeling of drainage, water distribution and sewer projects. He is also involved in highway drainage projects. ACTIVITIES AND ACHIEVEMENTS PSMJ Project Management Boot Camp I Training ICPR Training Seminar Haestad Methods - Water Distribution Modeling FOEP Stormwater Management Inspector 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 1.595 Final Design - FDOT District 4 (AECOM/Dragados) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [BJ Check if project performed with current firm Project Engineer - Design tasks include exfiltration trench design, storm sewer design and analysis and both wet and dry retention stormwater management pond designs. The design involved the use of spreadsheets, ICPR, ASAD and Microstation. a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Immokalee Master Drainage Study - City of Immokalee, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Engineer. The project consisted of analyzing the existing hydraulic conditions and proposed build-out conditions of a 600 acre site consisting of commercial and residential development. The Interconnected Channel and Pond Routing (I CPR) program was used to model the Seminole Tribe Immokalee Reservation Drainage Basin located in the City of Immokalee, Collier County, Florida. Aerials, existing topographic surveys, existing engineering plans, field observations, water table elevations, as-built information and the proposed Immokalee Master Site Plan were compiled to establish design guidelines for the overall surface water management system to set minimum road crown elevations, finish floor b. elevations and water storage requirements for the Seminole Tribe of Florida Immokalee Reservation Basin. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Kings Garden I & II Livable Neighborhood Improvements Project PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (CMGLNIP) - City of Miami Gardens, FL (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Engineer. This project consists of drainage improvements to an existing neighborhood of approximately 17 -acres as outlined in the Basis of Design Report. The project required permitting with Miami Dade Department of Environmental Resources Management. c. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME 13. ROLE IN THIS CONTRACT ADRIANA GONZALEZ, EI ROADWAY DESIGN a. TOTAL 8 14. YEARS EXPERIENCE b. WITH CURRENT FIRM 7 15. FIRM NAME AND LOCATION (City and State) EJ R.J. BEHAR & COMPANY, INC. ~ 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Civil Engineering Universidad del Valle, 2002/ Engineer Intern/No.11 000077631 Florida Cali, Colombia/1998 B. S. Civil En ineerin , Florida International Universit 12001 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Gonzalez has 8 years of civil engineering experience including the preparation of plans for FDOT and Municipalities. She has experience in working with MicroStation, AutoCAD and Descartes software. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Downtown Miami Storm Sewer Project (North Bayshore Drive) - City of Miami, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida 2007 (3) BRIEF DESCRIPTION (Brief scope size. cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm a. Ms. Gonzalez served as Project Engineer. Prepared roadway reconstruction plans. Also designed the proposed drainage system and horizontal and vertical street aliqnment. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SW 328th Street from SW 152nd Avenue to SW 137 Avenue - Miami-Dade County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Public Works Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Ms. Gonzalez served as Project Engineer. The scope of the project included master planning and feasibility analysis for the new roadway. This b. project involved the upgrading of the existing traffic signals to mast-arms and internally illuminated signs. The design phase for this project comprised of drainaqe, Iiqhtinq, siqnalization, siqninq and pavement markinqs. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SW 176th Street from SW 107th Avenue to US 1 - Miami-Dade County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Public Works Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm Project Engineer for this reconstruction and realignment project. The scope of this project included roadway plans, drainage, traffic and signing and marking plans. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SW 176th from SW 107TH Avenue to US 1 - Miami-Dade County Public Works PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Project Engineer for reconstruction & re-alignment. Reconstruction of SW 176th from SW 107th Avenue to US 1 in Miami, Florida. The scope of d. this project included roadway plans, drainaqe, traffic, and siqninq and markinq plans. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Kendall Drive (SR 94) from Mills Drive to SW 102nd Avenue, Miami-Dade County- PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) FDOT, District 6 2005 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm Project Engineer - The scope of the project included milling and resurfacing. She implemented comments for PS&E submittal, computation book e. review and roadway plans. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sistrunk Boulevard - City of Fort Lauderdale, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm f. Project Engineer on this planning and reconstruction project. In charge of planning and following to the reconstruction phase. She prepared the roadwav design including horizontal and vertical alignment. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) WATER & SEWER a. TOTAL 30 14. YEARS EXPERIENCE b. WITH CURRENT FIRM 6 12. NAME RICHARD BOLT 13. ROLE IN THIS CONTRACT 15. FIRM NAME AND LOCATION (City and State) EJ R.J. BEHAR & COMPANY, INC. !fI 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. /1978/ Building Construction 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Maryland No. 14562 Professional Engineer, Virginia No. 16025 Professional Engineer, District of Columbia, No. 8214 SBCCI Buildin Ins ector 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Bolt has extensive multi-disciplined experience in engineering and construction, including civil and structural engineering, architectural design, construction administration, inspections, general contracting and custom computer applications. He is currently performing civil/site design engineering for a variety of municipal projects in the South Florida area. Mr. Bolt's responsibilities include performing computer-aided design (CAD) and calculations for site layout, grading and paving, storm drainage, water systems and sanitary sewer systems. Additionally, Mr. Bolt reviews shop drawing submittals for conformance with construction documents, performs field inspections to monitor contractor performance and estimates construction costs. His successful completion of numerous municipal projects during his career demonstrates his capabilities of effectively managing the difficulties and complexities of such work. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR A 1 A, Palm Beach County - FOOT District 4 PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE 1RI Check if project performed with current firm Project Scope consisted of roadway design, hydrological/hydraulic modeling, drainage design, pavement marking, and signing plans, signal plans (3 locations), bridge plans, public involvement and lighting plans, mitigation plans and permitting. Mr. Bolt performed all the utility coordination, a. utility contacts for a 5 mile RRR project. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Powerline Road (SR 845) Palm Beach County - FOOT District 4 PROFESSIONAL SERVICES T CONSTRUCTION (If applicable) 2004 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE 1RI Check if project performed with current firm Pavement design, 8 signalized intersections, lighting plans, design variances, extensive public involvement, drainage improvements and design b. documentation. Mr. Bolt, performed all the utility coordination, procured all of the utility schedules, color-coded plans and utility cost estimates for a 3 mile RRR project (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Shady Banks (Septic Area 5) - City of Fort Lauderdale, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable 2004 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE 1RI Check if project performed with current firm Senior Engineer in charge of the design and preparation of the civil plans for the conversion of a septic system community to a sanitary sewer system. Also designed the replacement and upgrading of water mains in the neighborhood. The design included the grading for a lift station and c. the design of a sanitary force main. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Olive Avenue Water and Sanitary Sewer Replacement Project - City of West Palm PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) Beach 2004 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE 1RI Check if project performed with current firm Designed the complete replacement and upgrading of the water and sanitary sewer system on a 1.5 mile urban section of Olive Avenue from Lakeview Avenue to Palm Beach Lakes Blvd. in the downtown area. The project was performed under a joint project agreement between the city d. of West Palm Beach and FOOT during the reconstruction of the roadway. The utility coordination involved with this project was very complex because of the density of the utilities in this older and urban section of the downtown. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sanitary Sewer Assessments - Miami-Dade County Public Schools PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE 1RI Check if project performed with current firm The project was required by D.E.R.M. and involved documenting the layout, operation and condition of the private sewer systems (lift stations and private gravity systems) at 30 school sites throughout the northern portion of the County. The sewer assessment plans and reports were the basis e. for subsequent inflow and infiltration testinq, alonq with any necessarv repairs bv the school board. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT , (Complete one Section E for each key person) 12. NAME RAFAEL URDANETA, E.I. 13. ROLE IN THIS CONTRACT CONSTRUCTION/PROJECT MANAGEMENT a. TOTAL 22 14. YEARS EXPERIENCE b. WITH CURRENT FIRM 5 15. FIRM NAME AND LOCATION (City and State) EJ R.J. BEHAR & COMPANY, INC. fa 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) 8.S./19B71 Civil Engineer 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) E.!. Texas P.E. License # 57B14 - Venezuela 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Urdaneta has 22 years of experience in civil and structural engineering design projects that included experience in Austin, Texas, South Florida and Venezuela. The experience has involved public and private works projects including buildings, wastewater facilities, roadway, utilities and Stormwater and drainage systems, water distribution, malls high rise buildings, petroleum platform, subdivision, and medical centers. The experience includes hydrologic and hydraulic modeling related to land development projects. At R. J. Behar & Company, Mr. Urdaneta will be responsible for drainage design, structural evaluations, and cost estimating. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED Structure Inspection Program (SIP) Non.Sta Structures - SFWMD PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~Check if project performed with current firm Mr. Urdaneta served as Field Team Manager and Civil Inspector of the above mentioned program. The overall SIP objective was to systematically inspect water control structures owned or operated by the District. These inspections were performed to ensure operational integrity and to avoid partial or total failure that could endanger the lives and safety of the public. Mr. Urdaneta duties were but not limited to: a. Coordinate with District personal all dailv activities, prepare weeklv schedules, logistic arrangement and inspect civil elements of the structures. (1) TITLE AND LOCATION (City and State) Ii) YEAR COMPLETED W. 53rd Street (From W. 4th Avenue to W. 8th Avenue; AND from W. 8th Avenue to PROFESSIONAL SERVICES CONSTRUCTION (If applicable) W, 12th Avenue), Construction Engineering Inspection (CEI) Services - City of 2010 Hialeah, FL; American Recovery & Reinvestment Act (ARRA) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Project Administrator for the West 53rd Street ARRA-Funded reconstruction projects within the City of Hialeah. The general overview and scope for these two projects comprises of the complete reconstruction of West 53rd Street, including new sidewalk, curb & gutter, drainage improvements - new drainage inlets, 18" storm sewer cross drainage pipe, 18" exfiltration trench (French Drain). Also, proposed in the project b. scope are pavement milling and resurfacing, signing and pavement markings and grading of the adjacent swale areas and sod restoration with Performance Turf. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED NW 87 Avenue Extension -Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm c. Performed the Stormwater management and design for the construction of new roadway and permittinq. (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED Atlantic Blvd. at Rock Island Improvements - Broward County Engineering PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2005 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm d. Performed the stormwater management and design for the construction of a westbound left turn lane, westbound right turn lane, and dual left-turn lanes on all four legs. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Estero Bay Nutrient Load Assessment - South Florida Water Management District PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (SFWMD) 2005 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~Check if project performed with current firm Assess and develop a nutrient load assessment model for planners, regulators, and local stakeholders to evaluate various alternatives to protect e. and enhance water quality within the basin and related impacts on Estero Bav usinq the WAMView model. NE 33rd Avenue Neighborhood Improvement - City of Fort Lauderdale, FL : (2) YEAR COMPLETED 2005 Construction Project Manager - This project consisted of reconstruction and improvements of the NW 33rd Avenue Neighborhood, from NW 19th 1. Street to NW 29th Street, which included main water line replacement, drainage improvements, lighting improvements and roadway rehabilitation. Value $ 3,600,000 STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME 13. ROLE IN THIS CONTRACT CLAUDIA M. LAM US, EI TRAFFIC ENGINEERING 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 6 6 15. FIRM NAME AND LOCATION (City and State) riI R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) M.S. Civil Engineering, Florida International University, 2004 B.S. Civil En ineerin , Florida International Universit l 2001 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Lamus is currently an Engineer Intern. She has 5 years of transportation and traffic engineering experience. At RJ Behar, Ms. Lamus is responsible for traffic operation studies, traffic analysis, volume and speed studies. At RJ Behar, Ms. Lamus is in charge of traffic planning, modeling and forecasting. She also has significant experience in Arc-view GIS Application, Arc View/Avenue, HCS200, TSIS/CORSIM, SAS, AutoCAD, Primavera Scheduling, Excel, PowerPoint, Word and Access. Ms. Lamus has a Master's in Transportation Engineering. She is proficient in traffic and transportation planning software. Recently, she completed 5 traffic engineering projects/studies. Ms. Lamus has more than 4.5 years of transportation and traffic engineering experience. PROFESSIONAL TRAINING: Arc-view GIS Application, Arc View / Avenue, HCS200, TSIS/CORSIM, SAS, AutoCAD, Primavera Scheduling, Excel, PowerPoint, Word, and Access. Softwares: Synchro, Fsutms, Viper, Cube. 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 2001/ Engineer Intern/No. 1100007553/ Florida 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 1-75/ Griffin Road Intersection Traffic Study - FOOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm Ms. Lamus served as Project Engineer. The study consists of the preparation of an Interchange Operational Analysis Report (I0AR) for the interchange at Griffin Road and 1-75 in Broward County to assess the existing and future traffic operations of the interchange for an interim solution given a No-Build scenario and up to five (5) Build scenarios. The study included Signalized Intersection Analysis, Weaving Analysis, Queuing a. Analysis, Ramp Analysis, Interchange Capacity Analysis, and Crash Analysis. The study was done using the latest traffic software's such as CORSIM, SYNCHRO, AND FSUTMS/CUBE. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Town of Southwest Ranches Traffic Study - Town of Southwest Ranches, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm Ms. Lamus served as Project Engineer. Responsible for determine best traffic calming practices, including volume studies and speed studies. The scope of the project consisted of analyzing traffic patterns (an analysis of potential cut-through traffic) within two separate neighborhoods of b. Southwest Ranches ("The Trails" and "Country Estates"). RJ Behar, provided speed studies, origin-destination studies and daily traffic counts to determine best traffic calminq practices, includinq volume and speed studies (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 806 (Atlantic Avenue) Palm Beach County - FOOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm Ms. Lamus was in charge of traffic and signal plans preparation. This project includes milling and resurfacing (RRR) of 3 miles of a major arterial, c. siqnal improvements, safety improvements and miscellaneous drainage improvements. (1) TITLE AND LOCATION (City and State) I (2) YEAR COMPLETED FlU Traffic Study - Miami-Dade County Public Works PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2004 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm Ms. Lamus served as Project Engineer. This project includes the analysis of several intersections and also a link analysis. The existing d. conditions modeling were done using Synchro. Forecasting for the new links was done using FSUTMS and Synchro analyzed the proposed conditions with the volumes from FSUTMS. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Transportation Master Plan Traffic Counts - City of Hallandale Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE 00 Check if project performed with current firm e. Ms. Lamus served as Project Engineer. This project included 24 hours and turning movement counts for a master plan study aimed at improving conGestion within the city of Hallandale Beach. STANDARD FORM 330 (112004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE CARMEN APONTE, MS, CEI DRAINAGE/PERMITTING a. TOTAL 14 b. WITH CURRENT FIRM 7 15. FIRM NAME AND LOCATION (City and State) riI R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science in Industrial Engineering/Food Engineering/ Universidad INCCA de Colombia. Bogota, Colombia, 1991 Master of Science in Environmental Engineering, - April 2000 Florida International Universit FlU Miami, Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) At R.J. Behar, Ms. Aponte works on environmental and water resources projects. She provides support with hydrologic/hydraulic and water quality modeling. She also has significant experience with Phase I and II environmental assessments and pollution mitigation. She is familiar with modeling software WanView, AdICPR, and Modflow. She is also proficient in GIS applications software. 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Certified Environmental Inspector (CEI) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED NW 7th/9th Avenue Connector (PD&E) Study - City of Fort Lauderdale, Broward PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) County I FDOT District 4 Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm Project Engineer - Responsible for the re-evaluation of the contamination screening and evaluation report in accordance with FDOT/PD&E 23 CFR 771. The re-evaluation identifies significant environmental impacts, which may have changed after previous environmental reports. a. Conclusions and recommendations are also provided in order to continue to the nex1 project phase or Phase II of the Environmental Assessment before project execution. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED NW 87th Avenue, Miami-Dade County - FDOT District 6 PROFESSIONAL SERVICES TCONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm b. Ms. Aponte developed the drainage design including French drains and performed basin evaluation and calculations using AdlCPR and the ASAD models. (1) TITLE AND LOCATION (City and State) l2lYEAR COMPLETED North Broward County Neighborhood Improvement - Broward County Water & PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Sewer Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm Ms. Aponte is in charge of the design and proposed installation of a comprehensive storm water management system in a portion of the North Broward County Neighborhood Improvement Project (NCNIP). This project includes assessment the existing drainage system identifying c. problem areas and offerino the most suitable solution for existino flood problem. (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED NW 107th Avenue Feasibility Study - Miami-Dade County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm The purpose of the study was to provide an evaluation of feasibility for extending the NW 1 07th Avenue corridor from the northern terminus at NW d. 138th Street to NW 106th Street Ms. Aponte performed the analysis and evaluation of existing environmental conditions and provided recommendations for mitigation where applicable. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED NW 44th Street - City of Lauderdale Lakes, Florida PROFESSIONAL SERVICES TCONSTRUCTION (If applicable) 2005 2006 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm Drainage Engineer - She designed the drainage system for the roadway including pre vs. post analysis using Ad ICPR, storm sewer design, spread calculations, water quality ditch design with weir control, culvert life estimation, and prepared the drainage report. Also prepared the e. Environmental Resource Permit Packaoe. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED NW 5th Street Bridge Replacement - FOOT, District 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm f. Drainage Engineer for drainage design using French drains. This project includes major utility coordination, permitting package and large offsite areas discharging throuoh the project STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE SANDRA SEQUEIRA, M.S., E.I. WATER & SEWER/CIVIL & SITE ENGINEERING a. TOTAL 9 b. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) M.S. / 2001/ Civil and Environmental Engineering - University of Washington, Seattle B.S. /1995/ Civil Engineer, Universidad Nacional de Ingenieria, Mana ua, Nicara ua 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Sequeira is a civil engineer with nine years of experience in civil engineering, drainage design and construction management. Her graduate degree has provided her with the skills required for civil and environmental engineering. JiI 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Engineer Intern Florida, August 2007 License No. 1100011787 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 1-595 Final Design PROFESSIONAL SERVICES CONSTRUCTION (If applicable) FDOT, District 4 (AECOMlDragados) On-going (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE l&I Check if project performed with current firm Project Engineer involved with drainage design for several sections of the corridor. Design tasks include exfiltration trench design, storm sewer design and analysis, and both wet and dry retention stormwater management pond designs. The design involves the use of spreadsheets, ICPR, a. ASAD and Microstation (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Water and Sewer Improvements UAZ 303-Broward County Water & Sewer PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Chen & Associates On-going (3) BRIEF DESCRIPTION (Brief scope size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm Project Engineer responsible for the preparation of the construction documents and the permitting process with the agencies having jurisdiction. The civil engineering services for this project include 8" and 12" water mains and 16" transmission line, updating design as well as design of new b. I C!ravity sewer system, coordination of the utilities and the provision of the new service and evaluation of the existinC! public lift stations. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SW 328 Street from SW 152 Avenue to SW 137 Avenue PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Miami-Dade County Public Works On-going (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE l&I Check if project performed with current firm Project Engineer responsible for the preparation of the storm drainage construction documents and drainage report. She is in charge of the stormwater design services required for the new drainage system through the use of exfiltration trenches, catch basins, manholes and swale c. adjacent to the road. The analysis of the proposed drainage condition was done with ICPR. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North County Neighborhood Improvement Project PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Broward County, FL 2008 (3) BRIEF DESCRIPTION (Brief scope size. cost. etc.) AND SPECIFIC ROLE l&I Check if project performed with current firm Project Engineer in charge of drainage design and permitting. The scope of the project consisted of providing drainage design; cost estimating of drainage system; permitting of drainage system; and peer review of: water distribution plans, sewer distribution plans, water reuse master plan, water reuse design, streets and sidewalks plans. The peer reviews were performed at each phase of design. RJ Behar will also provide d. construction management and inspection services during the construction. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED C-1 Basin Masterplan PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Miami-Dade County DERM 2002 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm This project encompasses seven canals covering an area of 188 square miles including 53,000 acre-feet pf agricultural and urban runoff. The developed master plan will propose to identify the main water quantity and quality problems and will introduce strategic measures for mitigating such problems. She provided civil engineering services required for the development of the South Miami-Dade County watershed also known as the C-1 Basin. The purpose of the project was to develop a corrective plan for the management and treatment of storm water runoff including e. replacement and rehabilitation of storm water outfalls. STANDARD FORM 330 (112004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE DALTON POLANCO, EI CONSTRUCTION/PROJECT MANAGEMENT a. TOTAL 21 b. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and State) g R.J. BEHAR & COMPANY, INC. !a 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B. S. Civil Engineering, Florida State University, 1998 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, etc.) Civil Engineer with over 21 years of experience in the supervision, inspection, testing and design of roadway, utilities and building projects; worked in water works, transportation, geotechnical and environmental projects. LICENSES & CERTIFICATIONS . FDOT / CTQP Asphalt Paving Technician - Levell / Level II . FOOT / CTQP Final Estimates Levell / Levellj . FOOT LBR Technician . FOOT Asphalt Plant Levell 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 1998/En ineer Intern, Florida License No. 1100003005 . Work Zone Traffic Control Intermediate Level . HAZWOPER 40 HR Training . Nuclear Density Machine Operator . CMEC Concrete Cylinder Testing . ACI Field Technician Level 1 . CTQP Concrete Field Inspector 1 . CTQP Earthwork Construction Inspection Level 1 & Level 2. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED C-4 Conveyance Improvements, Miami-Dade County - SFWMD PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Inspector - He provided full onsite inspection of the sheet pile cut off wall, drainage outfalls and swale construction. He provided daily field a. reports and monitored of the construction. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Southern CREW Imperial River Restoration - SFWMD PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope size. cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Provided full on site inspection of the wetland restoration project. Provided daily field reports and monitoring of the construction. The scope of this project consists of providing construction inspection services for the construction phase to the Southern CREW Imperial River Restoration Project - Billy Don Grant Parcel Restoration. Restoration activities include re-grading existing filled and agricultural areas, filling ditches, and removing berms in accordance with the proposed restoration plan. The completed project will provide shallow foraging habitat in the freshwater marsh areas and gentle side slopes on the deep b. water depressions for tactile feeder wading birds, specifically the Wood Stork, white ibis and roseate spoonbills. Additionally, the plan provides and maintains the existing Panther habitat. Existing Cypress areas will remain and exotic vegetation removed. (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED Town Engineer - Town of Southwest Ranches, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Provided engineering and construction evaluation for road and land development projects. c. (1) TITLE AND LOCATION (City and State) I (2) YEAR COMPLETED Structure Inspection Program (SIP) Non-Sta Structures - SFWMD PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm Mr. Polanco served as inspector accompanying the diving team performing underwater inspections of 60 water control structures. The South Florida Water Management District (SFWMD and/or District) operates throughout 16 Florida counties from Orlando to Key West in an area that covers nearly18,000 square miles and serves more than 6 million people. Moreover, the District operates and maintains over 500 water control structures, 50 pump stations, and 1,969 miles of canals and levees. One component of the District's strategic plan under the Operation and Maintenance Program is the Structure Inspection Program (SIP). SIP results will help to identify structure deficiencies and generate recommendations for corrective actions to improve structure operation. The overall Structure Inspection Program (SIP) objective was to systematically inspect water control structures owned or operated by the District. These inspections were performed to ensure operational integrity and to avoid partial or total failure that could endanger the lives and safety of the public. d. RJ Behar provided project management, civil, electrical, mechanical and structural engineering inspection services for 31 culverts, 13 pump stations, 13 spillways, and 2 weirs. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE ROHAN PUNIT, EI CIVIL/SITE ENGINEERING a. TOTAL 3 b. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineering - Minor In Business Administration, University of Florida, May 2007 fit 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 2007/Engineer Intern Florida License No. 1100011628 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Punit has been involved in the design process of industrial, residential, and commercial land development projects, in both the public and private sectors. He has assisted with the design of various stormwater systems, grading schemes, site plan designs, and roadway projects. In addition to his land development experience, his construction field experience includes erosion and environmental control monitoring. Mr. Punit has used both AutoCAD and Microstation to aid in the design of numerous projects. At RJ Behar, he is responsible for support in the areas of design and permitting for multiple projects. These projects range from municipal to federal, with job duties including site and drainage design, plan revisions, and utility and project coordination. Mr. Punit has more than 3 years of experience. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED NW 87th Avenue, Miami-Dade County - FOOT District 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Project Engineer - He assisted with roadway plans preparation and drainage plans. New construction of NW 87th Avenue (from NW 74th Street to NW 103rd Street) within the Town of Medley in Florida. Scope of services include Roadway/traffic control plan (TCP) design, pavement marking & a. signing, signalization, lighting, drainage & permitting, bridge construction, utility coordination, traffic study, traffic counts, traffic projections and traffic warrants (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Turnpike Widening - FOOT Turnpike Enterprise PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2006 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm Officer Engineer (Internships). Mr. Punit assisted in the on-going construction of the Turnpike Widening Project in coordination with the FDOT. Maintained erosion control procedures, scheduled subcontractor work, and responsible for pay estimates as well as quantity tracking. He also b. assisted with scheduling and planning of various project activities (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED BCC & FAU A. Hugh Adams Parking Garage - Davie, FL PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Mr. Punit prepared site and drainage plans for the 5-level parking garage addition to the Broward Community College Central Campus. The scope of this project consists of civil engineering services for the design-build team for a 5-story 1000 vehicle parkinq qaraqe located in the Broward College Davie campus. RJ Behar responsibilities include site planning, paving grading and drainage, exterior parking lot layout and design as well as drainage design, permitting, utilities coordination, water and sewer design. RJ Behar will also provide support during construction. This project incorporates c. extensive coordination with the local Drainaoe District (CBWCD) and updates to the colleoe drainaoe master plan. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED BCC Central Campus Building #6 - Davie, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) On-going (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm Utility coordination with FPL and relocation of the existing electrical lines. Civil engineering for a 38,000 sf addition to BCC Building # 6. The d. scope of work includes demolition plan, paving and grading plans, drainage plans, water and sewer plans, utility coordination, and permitting and construction assistance. (1) TITLE AND LOCATION (City and State) I 12\ YEAR COMPLETED SW 178th Avenue - Southwest Ranches, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm e. Preformed traffic studies to determine recommendations for existino roadway deficiencies. STANDARD FORM 330 (1/2004) PAGE 2 I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME NANETTE AKYAZ 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE ROADWAY DESIGN a. TOTAL 12 b. WITH CURRENT FIRM 8 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) Current / Civil Engineering Program / F.I.U. Davie Campus Florida A.A. Degree / 1992 / Broward Community College Graduated with Highest Honors fi) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) At RJ Behar, Ms. Akyaz is responsible for plans preparation in both MicroStation and AutoCAD for civil and roadway projects. She also provides support on civil engineering projects. Ms. Akyaz has been responsible for preparation of roadway plans for many projects throughout South Florida. Her responsibilities included the preparation of plans using MicroStation. She drafted and performed revisions to site, utility, drainage, and structural plans. PROFESSIONAL TRAINING 2002 FOOT CAD Update Training Seminar 2002 FOOT PPM Design Update Training Florida International University - AutoCAD Release 12 FOOT / FICE - Load and Resistance Factor Design (LRFO) Training Geopak Road Hraining 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) 1-751 Griffin Road Interchange - FOOT District 4 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE b. Technician - She prepared t pical section packa e and qualit control review. (1) TITLE AND LOCATION (City and State) Milander Park Streetscape - City of Hialeah, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~Check if project performed with current firm. c. CAD Technician - She repared master plans for East 47th and East 48th Street from Palm Avenue to East 1st Avenue. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED US 1/SR 5 - St. Lucie County, FL - FOOT, District 4 PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2004 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Preparation of signalization plans. RJ Behar's scope was the drainage design and signalization upgrades. Drainage design included review of the d. roject histo site evaluations and development of the scope for 3R improvements. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED E. 6th Ave. (From E. 9th Street to Hialeah Drive), E. 5th Street (from E. 4th Avenue to PROFESSIONAL SERVICES CONSTRUCTION (If applicable) E. 6th Ave.), E. 5th Street (From E. 6th Ave. to E. 8th Ave.) - City of Hialeah, Florida 2004 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Reconstruction of 2.0 miles of a 3-lane urban road for the city of Hialeah following FDOT's and Miami-Dade County's standards (2000). Responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility relocation, as well as the design and drafting of signing e. and markin s lans and Ii htin includin Ii htin calculations. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2003 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Prepared roadway plans, drainage design, signing and marking, signal plans, conversion of overhead to underground utilities. The project f. consisted of the reconstruction of 1.6-miles of cit street, conversion from one wa to two-wa traffic. STANDARD FORM 330 (1/2004) PAGE 1 (1) TITLE AND LOCATION (City and State) E, 15t Avenue - City of Hialeah, Florida E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) WATER/SEWER 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 3 3 12. NAME SUGEIL Y PATXOT 13. ROLE IN THIS CONTRACT 15. FIRM NAME AND LOCATION (City and State) II:::) R.J. BEHAR & COMPANY, INC. !f;;;I 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineer, University of Puerto Rico, 2007 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) N1A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) At RJ Behar, Ms. Patxot is responsible for plans preparation and drainage calculations. She also assists in the preparation of drawings for proposals, boards and reports. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 1-595 Final Design - FDOT, District 4 (AECOM /Dragados) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) On-going (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE OOCheck if project performed with current firm Project Engineer involved with developing the drainage master plan update, and assisted with the drainage design for several sections of the corridor. Design tasks include exfiltration trench design, storm sewer design and analysis, and both wet and dry retention stormwater a. management pond designs. The design involved the use of spreadsheets, ICPR, ASAD and Microstation. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Structure Inspection Program (SIP) Non-Sta Structures - South Florida Water PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Management District 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE OOCheck if project performed with current firm Project Engineer - She coordinated the preparation of deliverables with the inspectors. She followed up with QC comments as well client b. comments, and prepared tracking charts for all deliverables. She worked on the preparation of all the inspection reports in coordination with the inspection team. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR A 1 A Palm Beach County - FDOT, District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE OOCheck if project performed with current firm Project Engineer - The scope consisted of roadway improvements along SR A 1 A from Boynton Inlet Bridge to Lake Worth Road. The project included a major drainage study and improvements, milling and resurfacing, signals bridge improvements and signing and marking plans. Ms. Patxot performed plan revisions during post design services. c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED C-4 Canal Flood Protection Belen Section - South Florida Water Management PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) District 2009 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE OOCheck if project performed with current firm Project Engineer in charge of plans preparation for design of a f100dwall for flood protection of the area of Belen in Miami-Dade. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North County Neighborhood Improvement Project - Broward County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE OOCheck if project performed with current firm Project Engineer - This project consisted of drainage design, construction management and peer review. Ms. Patxot was in charge of the plans preparation, drainage and quantity calculations. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hollywood Boulevard/SR 820 (US-' to SR A 1 A) - FDOT, District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) On-going (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE OOCheck if project performed with current firm Project Engineer in charge of plans preparation. She assisted with the drainage calculations and report preparation. f. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME MARLIN SCATTOLlNI 13. ROLE IN THIS CONTRACT CIVIUSITE ENGINEERING 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 3 3 15. FIRM NAME AND LOCATION (City and State) II R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B. S. Civil Engineering Florida International University 2006 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) At RJ Behar, Ms. Scat10lini is in charge of design and plans preparation of roadway projects, drainage plans, signing and pavement marking plans, signalization plans, and permit1ing package. She has 3 years of experience. ACTIVITIES AND ACHIEVEMENTS Golden Key Honor Society, Institute of Transportation Engineering (ITE) ASCE American Society of Civil Engineers. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Powerline Road (SR 845) Palm Beach County - FDOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2009 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm a. Project Engineer - She prepared the signing and pavement marking plans, 3R reports, plan preparation, utility coordination, pavement design and quantities. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SW 328th Street from SW 152nd Avenue to SW 137th Avenue - Miami-Dade County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Public Works Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm Project Engineer - She prepared the signing and pavement marking plans. The scope of the project included master planning and feasibility analysis for the new roadway. This project involved the upgrading of the existing traffic signals to mast-arms and internally illuminated signs. The b. design phase for this project comprised of drainage, lighting, signalization, signing and pavement markings. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hialeah High School Parking Garage - Civil Plans - City of Hialeah, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm Project Engineer for civil site improvements for this parking garage. Her responsibilities included water and sewer layout, signing and pavement marking and drainage layout. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED E. 1st Avenue, E. 47th Street, E. 48th Street Reconstruction - City of Hialeah, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm d. Project Engineer in charge of the design and production of roadway, drainage & signing and pavement marking plans. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 806 (Atlantic Avenue) Palm Beach County - FDOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm Project Engineer - She prepared the signing plans. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR5 (US 1/ S. Federal Highway) Broward / Palm Beach Counties - FDOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm f. Project Engineer - She prepared the signing plans. STANDARD FORM 330 (1/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) CAD DESIGNER a. TOTAL 20 14. YEARS EXPERIENCE b. WITH CURRENT FIRM 1 12. NAME HERNANDO SEGURA 13. ROLE IN THIS CONTRACT 15. FIRM NAME AND LOCATION (City and State) g R.J. BEHAR & COMPANY, INC. !fI 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) - Mechanical and Architecture Drafting, LACC, Los Angeles, CA 1983-1985 -Industrial Design University Jorje Tadeo Lozano, Bogota Colombia 1979-1980 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Segura has over twenty years of experience in civil engineering, survey and mapping projects throughout California and Florida. He is also experienced in municipal land development (commercial and residential) and roadway projects using CAL TRANS and FDOT standards. At RJ Behar, Mr. Segura produces complete design of construction plans on all types of civil engineering projects. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) 1-595 Final Design - FDOT, District 4 (AECOMlDragados) 2 YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE lIDCheck if project performed with current firm CAD Operator - He is updating sediment structure details for Arrowhead and Pine Island Outfalls; including updating plans, cross-sections and draina e Maps for Zone 4 and Zone 6. (1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED Congress Avenue and Park Avenue Intersection Improvement - Palm Beach PROFESSIONAL SERVICES CONSTRUCTION (If applicable) County, FL Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE lIDCheck if project performed with current firm CAD 0 erator - He is res on sible for re arin roadwa lans for this intersection im rovement in Palm Beach Coun . (1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED SE 3rd Street Roadway Reconstruction, from SE Avenue G to Martin Luther King PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Boulevard - FDOT, District Current (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE lIDCheck if project performed with current firm CAD Operator - This is a road reconstruction project (0.03 mile) in West Palm Beach County. He is involved in the preparation of plans, including roadway, drainage, lighting and pavement markings. He also prepared the plans and profiles for a new 8" water main and 8" PVC sewer line. These plans were used for quantit take outs for final construction cost. (1) TITLE AND LOCATION (City and State) Eller Drive Overpass ICTF (US 1 to Mcintosh Road) Fort Lauderdale, FL - FDOT, District 4 (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 a. b. c d. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE DCheck if project performed with current firm CAD Operator for the new $68 million Eller Drive ICTF Overpass Interchange with bridge improvements for the FOOT, District 4. This roadway is vital to Broward County and is part of the Strategic Intermodal System (SIS) connecting 1-595 to Port Everglades. The roadway also provides a direct connection to the Port from Fort Lauderdale-HolI ood International Airport. (1) TITLE AND LOCATION (City and State) SR 84, Collier County, FL - FDOT, District 1 2 YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 e. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE DCheck if project performed with current firm CAD Operator for the milling and resurfacing of 4 miles of an urban roadway section. The scope of services included development of typical sections, avement desi n, 3R re ort, communit awareness, roadwa plans, computation books, LRE and Tran* ort. (1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED 1-595 Reconstruction - Fort Lauderdale, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE DCheck if project performed with current firm CAD Operator who collected the existing sings data, 10 miles in length on 1-595 and side streets. The data was used for pavement markings sheets in Broward Count , FL f. STANDARD FORM 330 (1/2004) PAGE 2 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 120. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 01 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) SUNRISE ATHLETIC COMPLEX ADDITIONAL PARKING CITY OF SUNRISE, FLORIDA 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 a. PROJECT OWNER City of Sunrise 3495 N. Hiatus Road, Suite 200 Sunrise, Florida 33351 b. POINT OF CONTACT NAME Mr. John Cowling, PE Project Manager c. POINT OF CONTACT TELEPHONE NUMBER Tel: (954) 572-2486 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost) RJ Behar & Company was contacted by The City of Sunrise to provide engineering design services for the addition of parking spaces at the Sunrise Athletic Complex located at 11504 NW 44th Street within the City of Sunrise. ":I . (1) FIRM NAME R.J. Behar & Company, Inc. ;:. .IIIIl,,;, ~ (2) FIRM LOCATION 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 (3) ROLE Site plans, signing and marking, drainage, permits and utility coordination services. a. (1) FIRM NAME (2) FIRM LOCATION b. (1) FIRM NAME (2) FIRM LOCATION c. (1) FIRM NAME (2) FIRM LOCATION d. (1) FIRM NAME (2) FIRM LOCATION e. (3) ROLE (3) ROLE (3) ROLE (3) ROLE FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 120. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 02 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) HIALEAH PUBLIC WORKS SITE PLAN CITY OF HIALEAH, FLORIDA 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Current c. POINT OF CONTACT TELEPHONE NUMBER b. POINT OF CONTACT NAME Mr. Jorge Guanchez a. PROJECT OWNER City of Hialeah 900 E 56th Street Hialeah, Florida 33013 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost) Tel: (305) 687-2620 The scope of this project consists of a redevelopment to the existing Public Works Complex located on 2.99 acres at 3700 West 4th Avenue in the City of Hialeah, Miami-Dade County, Florida. Proposed are the following: demolition of 2 buildings, construction of a new building, resurfacing of the existing lots and improving the drainage system to meet DERM's criteria. This project proposes to retain the stormwater runoff on- site within exfiltration trenches prior to discharge over West 4th Street and into the outfall (canal). The three driveways located on-site are modeled as weirs that link the site to the outfall. An aerial view of the project location is shown in the photo below: .... ::' (1) FIRM NAME R.J. Behar & Company, Inc. ~ :: . ~ 1. j I !..l~ i1 :'j .... =,,,,,,, (2) FIRM LOCATION 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 a. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (3) ROLE (2) FIRM LOCATION e. FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 120. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 03 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) SR 7/ SW 36TH STREETSCAPE FINAL DESIGN -ISLAND PARK CITY OF LAUDERDALE LAKES, FLORIDA 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Lauderdale Lakes 4300 N.W. 36th Street Lauderdale Lakers, Florida 33319 b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Mr. Phil A. Alleyne, Director Office of Engineering & Construction Mana ement Services Tel: (954) 484-3131 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost) The project site is located in the City of Lauderdale Lakes, Florida at the intersection of SR 7/US 441 and NW 36th Street just north of West Oakland Park Boulevard. Specifically, the site is a large triangular shaped splitter island that is created by SR 7/US 441 on the east, 36th eastbound on the south and 36th east and westbound on the north. The project site is approximately 0.3 acres. The scope of the project included hardscape, landscape and irrigation construction documents. The scope also included a Conceptual Phase, which developed several alternatives for the city's review. Planview . .. . . .. .. Ul"II'1' ,.... U"71..ITC: 0UUl>'<O :; m '2 c: on (' "prTIo1'tl'iGW1Jo:... I """ .... ";\-'1 N ~~ ~1 ';-~ .:; (1) FIRM NAME R.J. Behar & Company, Inc. (2) FIRM LOCATION 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 (3) ROLE Engineering design services. a. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 120. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 04 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) KEYSTONE POINT NEIGHBORHOOD - TRAFFIC STUDY CITY OF NORTH MIAMI, FLORIDA 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of North Miami, Community Planning and Development Department 776 N E 125th Street P.O. Box 610850 North Miami, Florida 33161-0850 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost) b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Mr. John 0' Brien, Transportation Planner Tel: (305) 895-9830 Ext. 12159 R. J. Behar & Company, Inc. was contracted by the City of North Miami to conduct a speed study for the Keystone Point Neighborhood. This study was prompted by resident's complaints of speeding throughout the neighborhood. The study's objective was to determine the number of vehicles traveling above the speed limit and overall traffic speeds throughout the neighborhood. Additionally, the report was to include traffic calming measures that could be implemented to deter speeding. 1: U 4: :H : ~ '! Nl:. .,:\en.l.."....... ~ NE1~lt5J ~ Nl13~l\l" ~ N", 13~"ltrr..Cf" ~ ~ ~ N[1JettoS\ ~ :; Nf.1)!ltt>ln 0 N: 13!1m Tl"'TlKT -~~";'~ ." 24-hour speed counts were taking at the following seven locations, which had posted speed limits of 30 mph: N: ')~"s. N( 135trSl Alamanda Drive - East of Croton Road . Alamanda Drive - West of Croton Road Keystone Boulevard - East of Croton Road . Keystone Boulevard - West of Croton Road . Biscayne Bay Drive - West of Pine Road Ixora Road - North of Hibiscus Drive . North Bayshore Drive - North of Bayview Lane 1 l. i .:..r:t>Cr_D' R "'" .. n ~ I { i ~ o ~ ..,.",1;;.,_0< u ~,s, ~fIr., l Nt. I., 11(Ql~.Rll . . ~ I~Of:-Rc ~ . B<~~llf' B.<.y Dr _ ~ ! - s XI ~ 1 }~ . . " .' . . ~/~ ! le ~ n . , , ~ , . . s -<> I t . s j ~ & IS J?' JA o ." &arv-L., .~ - Volume Counts . Speed Counts l\"'IIbI~~Dr N'""tJI.'oU..D< SHd;nal..Dr s..'DIY......p' s - ...~6'V<l !..... .""'.. ..""~ '" ... #- 1.,s..........~()fltal: ..., ~ .q! ~ ~'>;<9v 1 j J s. } ~ o jf ..~-. N~ ~'.lf; s: L.",~l Lf' NMlltlTIIB....c em> NE123rC1Sl @ ~ I :. -, ':':' :: r -.....- - - . - --- - (1 ) FIRM NAME (2) FIRM LOCATION (3) ROLE R.J. Behar & Company, Inc. 6861 SW 196th Avenue, Suite 302 Traffic study and traffic calming services. a. Pembroke Pines, FL 33332 (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 120. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 05 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) SR 7/ SUNRISE BOULEVARD - CONSTRUCTION INSPECTION CITY OF LAUDERHILL, FLORIDA 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER a. PROJECT OWNER City of Lauderhill, Department of Engineering & Environmental Services 2101 NW 49 Avenue Lauderhill, Florida 33313 24. BRIEF DESCRIPTION OF PROJECT AND RELEV ANCE TO THIS CONTRACT (Include scope. size. and cost) Mr. J. Martin Cala, PE City Engineer The scope of this project consisted of the Construction Engineering Inspection Services for this intersection improvement project in the City of Lauderhill. This project involved the widening and reconstruction of a major urban arterial intersection and was accomplished through an agreement between FOOT and the City. It included extensive utility coordination, resulting from the widening of SR 7. The project had FOOT oversight, since SR 7 is a State Road. The project also involved drainage improvements, signalization and lighting. The project required a complex Maintenance of Traffic plan including periodic lane closures. The scope included organizing and attending preconstruction meetings, reviewing and monitoring of schedules, reviewing shop drawings, inspection of the construction, daily reports and final certification and closing. n. ':l ~ Tel: (954) 730-2961 .,. f" ~ ... / --- -1-$'>. "" ...t ~ ~- ,-""""~ ~ /4::.;.... c:' c. ~-::::::r :;r~' . "'/_ .c: " ..;;:-. -: (1 ) FIRM NAME (2) FIRM LOCATION (3) ROLE R.J. Behar & Company, Inc. 6861 SW 196th Avenue, Suite 302 Construction inspection services. a. Pembroke Pines, FL 33332 (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 120. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 06 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) DEVINE PARK (SITE IMPROVEMENTS) TOWN OF DAVIE, FLORIDA 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Current 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Town of Davie 6591 Orange Drive Davie, Florida 33314 b. POINT OF CONTACT NAME Mr. Emilio DeSimone, Project Manager c. POINT OF CONTACT TELEPHONE NUMBER Tel: (954) 797-1085 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost) RJ Behar has been contracted by the Town of Davie to provide engineering design services for the Devine Estates property located at 3000 S. Flamingo Road in Davie, Florida. The scope of this project consists of a multiuse typical equestrian and/or recreational trail and horse crossing within the Town of Davie. RJ Behar will convert a portion of the Devine Estates Tree Nursery into an equestrian park. Site elements include a multiuse pedestrian- equestrian trail, a gazebo overlooking the existing pond, design of a drainfield for the proposed bathrooms, horse trailer parking, and a staging area for patrons and enclosure of the remaining tree nursery with associated maintenance access. Permitting entities include the Town of Davie, Central Broward Water Control District and Broward County Health Department. -'I - . ~E~j'; J!:I" :1 3.!.' TIil ~ ~;. 11. ,;.' J - -- - - - - - - - -- - (1) FIRM NAME (2) FIRM LOCATION (3) ROLE R.J. Behar & Company, Inc. 6861 SW 196th Avenue, Suite 302 Civil engineering design service, site field Pembroke Pines, FL 33332 review, construction drawings and a. permittinq. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 120. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 07 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) SHADY BANKS, SEPTIC AREA #5 CITY OF FORT LAUDERDALE, FLORIDA 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER a. PROJECT OWNER City of Fort Lauderdale 100 N. Andrews Avenue Fort Lauderdale, Florida 33301 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost) Mr. Paul Bohlander, PE The scope of the project included preparing construction drawings for conversion of an existing septic system area to sanitary sewers. The project included approximately 21,150 linear feet of gravity sewers, 750 feet of forced mains, a sanitary sewer pump station and 8,000 feet of water line relocation. Services included full construction plans, specifications and estimates, construction bid assistance and construction support services during construction. The project was especially challenging due to the low elevations of the area and the fact that the project is an existing neighborhood. Concerns included the location of the pump station to avoid affecting residents, coordination with local schools, avoid affecting existing trees and coordination with all the existing utilities. A utility location and soft dig program was periormed and coordinated to avoid relocation of existing utilities and to design the proposed improvements. RJ Behar also participated in the public information program and coordinated efforts with the prime consultant in charge of the design of the pump station, the program manager and the City's Staff. RJ Behar also completed all the permitting efforts for the system, site planning and site design of the lift station. ::.. - (1) FIRM NAME R.J. Behar & Company, Inc. Tel: (954) 828-5772 ~ =.!l lIil Ii ;'::;:T'i' ,3i1 (2) FIRM LOCATION 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 (3) ROLE Subconsultant for sanitary sewer design, plans and construction services and pump station site design services. a. (1) FIRM NAME b. (1) FIRM NAME c. (1) FIRM NAME d. (1) FIRM NAME e. (2) FIRM LOCATION (2) FIRM LOCATION (2) FIRM LOCATION (2) FIRM LOCATION (3) ROLE (3) ROLE (3) ROLE (3) ROLE FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 120. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 08 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) BATTERSEA AND DOUGLAS ROAD DRAINAGE CITY OF MIAMI, FLORIDA 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Miami Mr. Jose Lagos, PE Tel: (305) 416-1252 444 SW 2th Avenue 8th Floor Miami, Florida 33130 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The project is located near the intersection of SW 37th Avenue (Douglas Road) and Battersea Road within the City of Miami limits. The project area had been experiencing significant drainage problems during regular storm events. RJ Behar prepared a study of the area to identify alternatives for reducing the drainage problems. RJ Behar also prepared plans to improve the drainage deficiencies for the intersection with milling and resurfacing of all the areas that were affected. STORHWATER INLET lOCATED AT THE NW CORNER OF THE INTERSECTION STORHWATER INLET lOCATED AT THE EAST SIDE OF BATTERSEA ROAD STORHWATER INLET lOCATED ON THE NW SIDE OF DOUGLAS ROAD NEAR THE INTERSECTION EXISTING CONDITIONS OF A TYPICAL INLET FOUND IN THE STUDY AREA - - (1) FIRM NAME (2) FIRM LOCATION (3) ROLE R.J. Behar & Company, Inc. 6861 SW 196th Avenue, Suite 302 Roadway plans, signing and marking plans, Pembroke Pines, FL 33332 specifications, traffic control plans, utility coordination and drainage improvements a. plans services. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 120. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 09 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) HILLSBORO BOULEVARD AT MILITARY TRAIL -INTERSECTION IMPROVEMENTS 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 a. PROJECT OWNER Broward County Highway & Engineering Division 1 N. University Drive, Suite 300B Plantation, Florida 33324 24. BRIEF DESCRIPTION OF PROJECT AND RELEV ANCE TO THIS CONTRACT (Include scope, size. and cost) b. POINT OF CONTACT NAME Mr. Richard Tornese, PE Project Manager c. POINT OF CONTACT TELEPHONE NUMBER Tel: (954) 577-4579 The scope of the project included improvements to Hillsboro Boulevard (SR 810) at the Military Trail intersection. Military Trail is a four-lane, urban, divided, north-south collector. There are two through lanes with double left turn lanes and an exclusive right turn lane at each approach to the intersection. Hillsboro Boulevard is a six-lane, urban, divided, arterial; with a double left and exclusive right turn lanes at each approach to the intersection. The posted speed limit is 40 mph on both roadways. Responsibilities included the installation of four mast arms at the intersection of Hillsboro Boulevard and Military Trail located within the City limits of Deertield Beach in Broward County. R.J Behar pertormed traffic studies, designs, roadway plans, signalization plans, signage plans, drainage plans, lighting plans, landscaping plans, public involvement and utility coordination for this major intersection improvement. ~,. 1 ~.... CI .. i3 = ," . ~ -:-:; i' r 7 - - - - - - (1) FIRM NAME (2) FIRM LOCATION (3) ROLE R.J. Behar & Company, Inc. 6861 SW 196th Avenue, Suite 302 Traffic study, roadway plans, drainage Pembroke Pines, FL 33332 plans, and utility coordination for major a. intersection improvements. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 120. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 10 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) SW 176TH STREET FROM SW 107TH AVENUE TO US 1 MIAMI-DADE COUNTY, FLORIDA 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME Miami-Dade County Public Works Dep. Ms. Priscilla Morales 111 NW. 1 st Street Miami, Florida 33128 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost) c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 375-4866 The scope of the project included master planning and feasibility analysis for a new roadway, including evaluation of traffic signals vs. traffic circles. After the master planning was completed, then roadway design including drainage, signing & marking and lighting proceeded. RJ Behar also provided the coordination with utilities, permitting and public involvement with presentations to the Commissioners. - I .. :; - I (1) FIRM NAME (2) FIRM LOCATION (3) ROLE R.J. Behar & Company, Inc. 6861 SW 196th Avenue, Suite 302 Master Planning feasibility analysis and Pembroke Pines, FL 33332 roadway design including drainage, signing a. & marking and lightinQ. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (3) ROLE e. FORM 330 (1/2004) PAGE 3 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS Robert J. Behar, PE Principal-in-Charge X X X X X X X X X Javier Rodriguez, PE Project Manager/Civil/Site X X X X X X Engineer Juan H. Vazquez, PE, PH, BCEE WaterlSewer X X X David M. Boyer, PE Drainage I Permitting X X X X Rafael De Arazoza, PE, PTOE, CPM Traffic Engineer X Carlos Mazorra, PE Roadway Design X Sean F. O'Keefe, PE Traffic Engineer X X Anthony V. Alfred, PE Roadway Design X X David Romano, PE Construction I Project X Management Kelly Nowell, PE, LEED AP WaterlSewer, Drainage! X X Permitting, Civil/Site Engineer Hans Ribbeck, PE Roadway Design X X Fernando Cano, PE Drainage! Permitting X Adriana Gonzalez, EI Roadway Design X X Richard Bolt Water! Sewer X Rafael Urdaneta, EI Construction! Project X Management Claudia M. Lamus, MS, EI Traffic Engineer X X Carmen A. Aponte, MSE, CEI Drainage I Permitting X X Sandra Sequeira, MS, EI Water I Sewer, Civil! Site X Engineering Dalton Polanco, EI Construction I Project X Management Rohan Punit, EI Civil I Site Engineering X X X Nanette Akyaz Roadway Design X X Sugeily Patxot WaterlSewer X Marlin Scattolini Civil! Site Engineering X Hernando Segura Civil! Site Engineering X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Sunrise Athletic Complex Additional Parking 6 Devine Park (Site Improvements) City of Sunrise Florida Town of Davie Florida Hialeah Public Works Site Plan Shady Banks, Septic Area # 5 2 Citv of Hialeah. Florida 7 City of Fort Lauderdale Florida 3 SR 7/SW 36th Streetscape Final Design-Island Park, 8 Battersea And Douglas Road Drainage City of Lauderdale Lakes. Florida City of Miami. Florida 4 Keystone Point Neighborhood-Traffic Study 9 Hillsboro Boulevard at Military Trail-Intersection City of North Miami Florida Improvements SR 7/Sunrise Boulevard-Construction Inspection, SW 176th Street from SW 107th Avenue to US 1 5 City of Lauderhill Florida 10 Miami-Dade. Florida STANDARD FORM 330 (1/2004) PART 1- PAGE 4 H. ADDITIONAL INFORMATION SUPPLEMENTAL INFORMA TION TO STANDARD FORM 330 Specialized Experience and Technical Competence lid! R.J.Behar & Company. Int. R.J, Behar & Company (RJ Behar) was established in 1999, to provide personalized r.l;;J E n gin e e , 5 . " I ann e r 5 services in the disciplines of engineering, planning, and construction inspection/management to public and private clients. Our mission is to understand our client's needs, apply the necessary resources to accomplish these needs, as well as building and maintaining long-term professional relationships with our clients. We pride ourselves in meeting our client's needs through the use of proper project management and an extensive quality assurance program. Repeat business is the key to our success and as such we recognize the need to satisfy our clients. Our expertise includes Utility water and sewer design, structural design of pump stations, bridges, hydrology and hydraulics, environmental restoration, flood control, erosion control, site plans, paving grading and drainage plans and utility system design and relocation. RJ BEHAR has the capability to provide plans in AutoCAD and in Microstation systems with. We have prepared structure and facility inspection reports, feasibility studies, environmental studies, cost estimating services, and have extensive plans, and specifications preparation experience. We have also provided deliverables in GIS format. GeoQraphic Location of Firm Relative to the Work Site. RJ Behar office in charoe of this proiect is located at 6861 SW 196th Avenue. Suite 302, Pembroke Pines, Florida. Broward County. Other offices include 7850 NW 146th Street, Suite 504, Miami Lakes, Florida 33016 in Miami-Dade County and 12788 Forest Hill Boulevard, Suite 20038, Wellington, Florida 33414 in Palm Beach County. QUALITY MANAGEMENT PLAN: Our internal Quality Assurance Program is integrated in all of our services. The program is monitored by our President, who is responsible for maintaining the highest degree of quality in all of the services provided by RJ Behar, An independent reviewer reviews all of our professional services. This process has proven to provide the highest level of quality and cost effective product for our client. RJ Behar monitors progress on its project on a weekly basis; we monitor the schedule, manpower requirements, major issues requiring immediate resolution and the project's budget. We utilize custom-made spreadsheets as well as Microsoft Projects software for project scheduling. RJ BEHAR RESOURCES: RJ Behar has state of the art computerized equipment including color plotters, laser printers, copier machines, networked personal computers, Windows 2003 network server and keeps communications through the use of e-mail, fax machines, etc. RJ Behar has developed expertise in the following areas: .:. Civil Engineering .:. Roadway Design .:. Traffic Studies .:. Water and sewer design (as demonstrated in our experience section) .:. Development of design/build criteria packages .:. Development of Digital Terrain Models with software such as Geopack for determination of ground cross sections. .:. Experience in participating in large design/build projects. .:. GIS applications .:. Development of digital maps using Cad software such as AutoCAD and Microstation .:. Public Involvement Programs Quality Control Process ,. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Production _.. _ _ _ _ _ _ _ _ _ _ __: liB tt .. ttl ; --------- ---------- IIIBiD,., ~ ! ~("":.~. <- IIlI,'SlU-.___ - Ouality(ontTol MokeAdditJoolll l\nUIOIti t fn;\ ~ ~-~ L . I' ,I' ."k,(""Ch<<",,,.,"dP~, Relhecl RE!JM..lIfkeilpnrm' 00 Along With R:[: MarkedPnrm -CIllft(llOllS~ + 0-_1111,'.,1111111111"- + I Repeal DC (hedung t 1 I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATURE !f~.~ 33. NAME AND TITLE Robert J. Behar, PE - President 132. DATE May 25, 2010 STANDARD FORM 330 (1/2004) PAGE 5-1 2a. FIRM (OR BRANCH OFFICE) NAME R.J. BEHAR & COMPANY, INC. 1999 115682549 2b. STREET 6861 SW 196th Avenue, Suite 302 5. OWNERSHIP a. TYPE CORPORATION 2c. CITY Pembroke Pines 2d. STATE 2e. ZIP CODE FL 33332 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Robert J. Behar, PE - President/CEO Small Disadvantaged Business 7. NAME OF FIRM (If block 2a is a branch office) 6b. TELEPHONE NUMBER (954) 680-m1 6c. E-MAIL ADDRESS bbehar@rjbehar,com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function c. No. of Employees a. Profile b. Experience c.Revenuelndex Code b. Discipline Code Number (see below) (1) FIRM (2) BRANCH 02 dministrative 6 B02 Bridges 2 08 CADD Technician 2 C15 Construction Management 2 12 Civil Engineer 4 C18 Cost Estimating 1 15 Construction Inspector 4 D04 Design-Build (Preparation for RFP 1 23 Environmental Engineer 2 E09 Environmental Impact Studies 1 57 Structural Engineer 2 E13 Environmental Testing and Analysis 1 60 ransportation Engineer 7 H07 Highways; Streets; Airfield Paving; 6 Parking Lots 21 1 P06 Planning (Site, Installation, Projects) 1 42 1 R03 Railroad; Rapid Transit 1 47 1 R04 Recreation Facilities (Parks, Marinas) 2 18 2 S07 Solid Wastes; Incineration; Landfill 1 16 2 S09 Structural Design; Special Structures 1 14 1 S 13 Stormwater Handling & Facilities 3 62 3 T03 Traffic & Trans ortation En ineerin 2 32 1 W02 Water Resources: H drolo ; GWater 2 39 3 PROFESSIONAL SERVICES REVENUE INDEX NUMBER Less Than 5100,000 6. 52 million to less than 55 million 5100,000 to less than 5250,000 7. S5 million to less than S10 million 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM 1. FOR LAST 3 YEARS (/nsert revenue index number shown at right) 2. a. Federal Work 1 3. b. Non-Federal Work 6 4. c. Total Work 6 5. 5250,000 to less than S500,000 5500,000 to less than S1 million 51 million to less than 52 million 8. S10 million to less than S25 million 9. S25 million to less than S50 million 10. 550 million or greater a. SIGNATURE 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. b. DATE MAY 25, 2010 c. NAME AND TITLE Robert J. AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (112004) PART 1- PAGE 6 Current Projects: Bold Completed Projects: Regular Font PROJECT NAME CLIENT NAME/CONTACT PROJECT STARTED EAC Consultmg (MDX) SR 836/1-95 SIMR Review Chris Bucknor, PE 305-553-8094 2010 FOOT District 4 Jeanette Harris 954-777-4382 Oversight CEI for ARRA LAP Projects 2010 Metric Engineering (MDX) SR 874 PD&E Study Vicky Garcia 305-235-5098 2010 C3TS (FOOT DISTRICT 4) SR 80 PD&E Study Olga Farmer 305-445-2900 2010 H & J Contracting (FOOT District 4) SE 3rd Street Design/Build Jeremy Rury 561-791-1953 2010 City of Hialeah Hialeah Mulching Pit Groundwater Sampling Report Ray Zamora 305-333-8158 2010 City of West Palm Beach Northlake Boulevard Water and Sewer Dick Verduin 561-494-1040 2010 The LPA Group (FOOT District 4) SR 615 RRR Julie Lorenz 803-254-2211 2010 EAC Consulting (FOOT District 6) SR968/SW 1 Street Chris Bucknor, PE 305-553-8094 2010 FOOT District 6 SR 5/US 1 Overseas Highway Danny Iglesias 305-470-5457 2010 BC Water & Sewer (Malcolm Pirnie) C12/C13 Interconnect for Water Management Malcolm Pirnie 954.761.3460 2010 FOOT District 4 Project Management Assitance Juan Bowles 1-866-336-8435 2010 SFWMD Const. Management S-332 PS Hardening Ed Palmowski 561-686-8800 2010 EAC Consulting (MDX) SR 836 Widening - MDX 83628 Chris Bucknor, PE 305-553-8094 2010 Bethesda West Hospital MUPD (Bridge over E-1 Palm Beach County Canal) Tanya McConnell, PE 561-684-4000 2010 City of Miramar Master Plan Park Update Terrance Griffin 954-602-3054 2010 EAC Consulting (MDX) NW 14 Street Concept Report Chris Bucknor, PE 305-553-8094 2010 Kimley Horn (Miami Dade County MPO) Bicycle /Pedestrian Counts Gregory Kyle 561-845-0665 2010 riI R.J.8ehar & Company, Inc. Project List and Client Contact - Page 1 Current Projects: Bold Completed Projects: Regular Font PROJECT NAME CLIENT NAME/CONTACT PROJECT STARTED Design Build Criteria Package - Pedestrian Town of Southwest Ranches Bridges Carl Huntsberger, PE 954-434-0008 2010 S-60 Gate Operator Replacement and Concrete AECOM (SFWMD) Repairs Jeff Sumner 561-686-880 2010 Const. Management BBCS Deering Estates SFWMD Flowaway Ed Palmowski 561-686-8800 2010 FDOT District 4 1-95 Installation of High Friction Course Celestino Lucero 1-866-336-8435 2010 Bus Stop and Pedestrian Signal Construction City of Lauderhill Inspection Juan Martin Cala 954-739-0100 2010 FDOT District 4 Atlantic Boulevard Plans Review Juan Bowles 1-866-336-8435 2010 FDOT District 4 Pines Boulevrad Plans Review Juan Bowles 1-866-336-8435 2010 Const. Management S-331 Pump Station SFWMD Hardening Ed Palmowski 561-686-8800 2010 Sunrise Boulevard Bridge Gemstone Traffic Control Plan Cameron Jewell 2010 riJ R,J.Behar & COmpo!!1)'. Inc. Project List and Client Contact - Page 2 Current Projects: Bold Completed Projects: Regular Font PROJECT NAME CLIENT NAME/CONTACT PROJECT STARTED Sanitary Sewer Collection System Broadview Estates BC Water & Sewer (Malcolm Pirnie) BP2 Jane Hardesty 954-761-3640 2009 FOOT District 4 (AECOM) 1-595 Final Design Eduardo Curiel 954-513-3838 2009 Town of Davie Land Use Amnedment Plan - Traffic Study Planning & Zoning 954-797-1015 2009 FOOT District 4 (Sanchez-Zeinali) SR 849/NW 31st Street 3R Frank Panellas, PE 305-477-4467 2009 Town of Southwest Ranches Town Engineer Permitting - 2009 Carl Huntsberger, PE 954-434-0008 2009 Palm Beach Co (Erdman Anthony) Congress Avenue and Park Avenue James Noth, PE 561-753-9723 2009 Bergeron Properties Bergeron Rodeo Arena Turnpike Signs Ron Bergeron 954-680-0223 2009 Town of Southwest Ranches Griffin Road Trails Phase II Carl Huntsberger, PE 954-434-0008 2009 Seaboard Marine Cargo Terminal Redevelopment Port of Miami (PB Americas) Phase 2 Jorge Maspons, PE 305-261-4785 2009 City of Boynton Beach (IBI Group, Inc.) Palmetto Greenways Rick Durr, PE 561-383-5400 2009 City of Boynton Beach (IBI Group, Inc.) Barton Greenways Rick Durr, PE 561-383-5400 2009 Town of Davie Devine Park Keith Pursell 954-797-1191 2009 Town of Davie Old Davie School Improvements Keith Pursell 954-797-1191 2009 City of Hialeah W. 29 Street Armando Vidal 305-883-5800 2009 City of Hialeah Palm Avenue (W. 45 st to W. 47 St) Armando Vidal 305-883-5800 2009 City of Hialeah Palm Avenue (W. 47 st to W. 49 St) Armando Vidal 305-883-5800 2009 City of Hialeah Hialeah Public Works Site Plan Armando Vidal 305-883-5800 2009 Superior Landscaping & Lawn Service Royal Palm Blvd Landscaping TCP plan Eddie Cora 305-634-0717 2009 , PiI R.J.B@har & (ompal1)', lnc. Project List and Client Contact - Page 3 Current Projects: Bold Completed Projects: Regular Font PROJECT NAME CLIENT NAME/CONTACT PROJECT STARTED Palm Beach County Ocean Avenue (Lantana) Bridge David Young 561-684-4000 2009 SFWMD Southern Crew Imperial River Restoration - Phase II Bonnie Batchelor 561-686-8800 2009 Palm Beach County 1-95 Off- Ramp Bridge at Lantana Road David Young, PE 561-684-4000 2009 SFWMD (AECOM) Compartment "C" Construction Management Eric Gonzalez 561-686-8800 2009 City of Hialeah E. 4th Avenue Improvements Jorge Hernandez 305-883-5800 2009 Midway Road CR 712 from 25th St to US 1 FDOT District 4 (Kim ley-Horn) 2009 WTP 2A Disinfection Tank Evaluation BC Water & Sewer (Malcolm Pirnie) 2009 Palm Beach County George Bush Boulevard Bridge David Young, PE 561-684-4000 2009 Broward County School Board US DOJ Manadated ADA Corrections Juana Romaniuk 954-765-6390 2009 Palm Beach County Cherry Road Bridge over the L-3 1/2 Canal David Young, PE 561-684-4000 2009 T own of Southwest Ranches Catch Basin Inventory Carl Huntsberger, PE 954-434-0008 2009 Seawall Repairs at Indian Mound Park & Hillsboro City of Pompano Beach Inlet Park Clayton Young 954-786-4029 2009 Broward County School Board Pompano Beach HS Area Repair Antonio Cardozo 754-321-1500 2009 BC Water & Sewer (Malcolm Pirnie) Twin Lakes Jane Hardesty 954-761-3640 2009 City of Hialeah W. 29 Street Safety Review Jorge Hernandez 305-883-5800 2009 EAC Consulting (MDX) SR 874 Constructibility and MOT Review Chris Bucknor, PE 305-553-8094 2009 City of Pembroke Pines Emergency Water Line Repair Joseph McLaughlin, PE 954-435-6511 2009 Marginal Bridge Road over L5 Canal Palm Beach County 2009 Broward College Central Campus Building 5 Stairs Repair Jeff Margolies 954-201-7897 2009 Pi) R.J.Behar & Company. Inc. Project List and Client Contact - Page 4 Current Projects: Bold Completed Projects: Regular Font PROJECT NAME CLIENT NAME/CONTACT PROJECT STARTED FDOT District 4 (Greenhorn & O'Mara) SR 60 Marty Workman, PE 561-686-7465 2009 FDOT District 4 (Aim Engineering) SR 76 Mike Becker 2009 FDOT District 4 (Aim Engineering) SR A 1 A Michael Adams, PE 2009 RJ Behar RJBehar office - 301 Robert Behar, PE 954-680-7771 2009 EAC Consulting (MDX) SR 836/SR 826 (Section 5) Plans Review Chris Bucknor, PE 305-553-8094 2009 Broward College Geotechnical Services - South Campus Softball Field Jeff Margolies 954-201-7897 2009 FDOT District 4 (GBF) SR A 1 A (Oakland Park to N. of Flamingo Rd) Patricia DuBois 954-492-9921 2009 City of Pembroke Pines Sidewalk Improvements. Construction Inspection Joseph McLaughlin, PE 954-435-6511 2009 City of Hialeah W .53rd Street (W. 4th Ave. to W. 8th Ave). CEI Jose Sanchez 305-883-5800 2009 City of Hialeah W. 53rd Street (W. 8th Av. To W. 12th Ave) - CEI Jose Sanchez 305-883.5800 2009 m R.J.Behar & (ompill1)', Inc. Project List and Client Contact - Page 5 Current Projects: Bold Completed Projects: Regular Font PROJECT NAME CLIENT NAME/CONTACT PROJECT STARTED NW 33rd Ave Swale Project - Construction City of Fort Lauderdale Inspection Hal Barnes, PE 954-828-5065 2008 City of Coral Springs Eastside Aquatic Center Parking Lot Glenn Weiss 954-344-1162 2008 City of Sunrise Sunrise Athletic Complex Additional Parking John Cowling 954-746-3250 2008 SFWMD S-65E Construction Inspection Lucine Dadrian 561-686-8800 2008 SE 15th St.,South Miami Rd., SE 10th Ave City of Fort Lauderdale Inetrsection Improvements Hal Barnes, PE 954-828-5065 2008 E. 1 Avenue, E. 47 Street, E. 48 Street City of Hialeah Reconstruction Jorge Hernandez 305-883-5800 2008 Broward County School Board Peters Elementary School - Threshold Inspection Juana Romanaski 2008 City of Hialeah Hialeah Parking Garage - Civil Plans Armando Vidal 305-883-5800 2008 FOOT District 4 (Boyle Engineering) 1-95 Cantilever Signs Boyle Engineering 813-630-2500 2008 Superior Landscaping & Lawn Service Fort Lauderdale-Hollywood Airport SWPPP Eddie Cora 305-634-0717 2008 Broward Community College (Carataya) FAU BCC Parking Garage Mario Cartaya, RA 954-771-2724 2008 BC Water & Sewer (Chen & Associates) Water and Sewer Improvements UAZ 303 Peter Moore, PE 954-730-0707 2008 City of Ft. Lauderdale Seven Isles Entry Beautification Hal Barnes, PE 954-828-5065 2008 Broward Community College North Campus ADA Walkways & Ramps Juan Raigosa 954-201-6817 2008 Broward Community College Main Campus Stormwater Master Plan Update Juan Raigosa 954-201-6817 2008 Evan Krakower Esq Laksha Oshun Case Robert Behar, PE 954-680-7771 2008 Garden Court Drainage G. Batista & Associates G. Batista 954-434-2053 2008 City of Sunny Isles Beach Sunny Isles Boulevard Median Opening Rick Conner 305-947-0606 2008 m R.J.Behar & (ompal1)'. Inc. Project List and Client Contact - Page 6 Current Projects: Bold Completed Projects: Regular Font PROJECT NAME CLIENT NAME/CONTACT PROJECT STARTED SFWMD C 4 Post Design Services and Inspection Lucine Dadrian 561-686-8800 2008 Town of Davie Davie In-House Support Staff Keith Pursell 954-797-1191 2008 SFWMD (Shaw Environmental) Clewiston Land Assessments Kenneth Lulewicz 321-751-7248 2008 City of Pembroke Pines Pines Boulevard and 1-75 Interchange CEI Joseph McLaughlin, PE 954-435-6511 2008 City of Miami Miami River Greenways - Segment D Manny Mejido 305-416-1280 2008 City of Ft. Lauderdale NW 7th & 9th Connector Mina Samadi 954-828-5772 2008 BC Water & Sewer (Malcolm Pirnie) Davie Tower Structural Analysis Jane Hardesty 954-761-3640 2008 Preliminary Siting Analysis for 4 New Communication BC Water & Sewer (Malcolm Pirnie) Towers Jane Hardesty 954-761-3640 2008 Ii) R.J.Behar & Comp311Y, Inc. Project List and Client Contact - Page 7 Current Projects: Bold Completed Projects: Regular Font PROJECT NAME CLIENT NAME PROJECT STARTED City of Sunrise NW 44th Street Improvements John Cowling 954-318-2264 2007 City of Hialeah Southeast Park Master Plan Jeff Lagomacini 305-883-5800 2007 City of Hialeah Q'Quinn Park Master Plan Jeff Lagomacini 305-883-5800 2007 INGEMEL Crown Linen Hialeah 954-318-2264 2007 City of Lauderdale Lakes Miscellaneous Engineering Services Manny Diaz 954-676-3622 2007 City of Hialeah Milander Park Master Plan Jeff Lagomacini 305-883-5800 2007 City of Lauderdale Lakes SR 7/SW 36th Street Schematic Layouts - The Island Phil Alleyne 954-676-3622 2007 City of Boca Raton (G&O) Countess de Hoernle Park - WO 002 Mark Tomczyk, PE 561-686-7707 2007 City of Ft. Lauderdale (K&S) Riverwalk South RPR Barbara Siteram 954-776-1616 2007 City of Hialeah Walker Park Master Plan Jeff Lagomacini 305-883-5800 2007 City of Hialeah Sparks Park Master Plan Jeff Lagomacini 305-883-5800 2007 ESI Consulting Engineers Diplomat Chilled Water Routing Evaluation Igor Gonzalez 305-418-9177 2007 Broward County Housing Authority Boundary Sketch at SR 7 Betth Kinsey 954-739-1114 2007 City of Hialeah FPL Service Point at W. 8th Avenue Jorge Guanchez 305-883-5800 2007 Consul Tech SR 826 VECP-Evaluation of MSE Walls 305-599-3141 2007 City of Miramar C-9 Impoundment Evaluation Tom Good 954-602-3000 2007 FOOT District 4 1-75/Griffin Road Interchange Leo Delgado 1-866-336-8435 2007 City of Lauderdale Lakes SR 7 Bus Shelters Design/Build Critera Package Phil Alleyne 954-676-3622 2007 riI R.J.Behar & Compoany, In" Project List and Client Contact - Page 8 Current Projects: Bold Completed Projects: Regular Font PROJECT NAME CLIENT NAME PROJECT STARTED Miami Dade County Public Works SW 328 Street John McCord, PE 305-375-3313 2007 Broward County Water & Sewer (MLA) North County Neighborhood Improvement Darren Badore 954-436-7000 2007 City of Sunrise Welleby Park Expansion Alan Gavazzi, AlA 954-572-2490 2007 Central Broward Water Control District District Engineer Permit Reviews Michael Crowley 954-432-5110 2007 City of Lauderdale Lakes SR 7/SW 36th Street Final Plans Phil Alleyne 954-676-3622 2007 City of Palm Beach Gardens PBG Police Monopole Major Ernie Carr 561-799-4100 2007 City of North Miami Keystone Point Traffic Study John O'Brien, PE 305 895-9830 ext.12159 2007 Florida Turnpike Enterprise (URS) Guardrail Retrofit Program John Saunders, PE 813-286-1711 2007 FDOT District 4 Powerline Road - Revised Fernando Morales 1-866-336-8435 2007 City of Sunrise Springtree Canal Rehabilitation Mark Lubelski, PE 954-572-2490 2007 City of Lauderhill SR 7/Sunrise Blvd Construction Inspection Martin Cala, PE 954-739-0100 2007 City of Coral Springs Town Center Roadway Study Glenn Weiss 954-344-1162 2007 Broward Housing Authority Highland Gardens Cost Estimate Beth Kinsey 954-739-1114 2007 SFWMD (Malcolm Pirnie) S-65C Boat Lock Supplemental Inspection Jane Hardesty 954-761-3460 2007 Cartaya & Associates Hilton Garden Inn - Miramar Mario Cartaya 954-771-2724 2007 Town of Southwest Ranches Southwest Ranches Fill Permits Carl Huntsberger, PE 954-434-0008 2007 Town of Southwest Ranches Southwest Ranches Code Enforcement Support Carl Huntsberger, PE 954.434-0008 2007 T own of Southwest Ranches Southwest Ranches Miscellaneous Applicant Support Carl Huntsberger, PE 954-434-0008 2007 m R,J.Behar & Company, In" Project List and Client Contact - Page 9 Current Projects: Bold Completed Projects: Regular Font I PROJECT NAME CLIENT NAME PROJECT STARTED Cartaya & Associates BCC Central Campus Building #6 Mario Cartaya 954-771-2724 2007 City of Miramar TOC-Land Use-Traffic Study Tom Good 954-602-3000 2007 Palm Beach County Congress Avenue/Forest Hill Intersection David Young 561 684-4149 2007 Miami Dade County Parks Dept Crandon Park - Structural Safety Survey and Repairs Manuel Cruz 305-755-5463 2007 IBI Group, Inc. Belvedere Road Exit Ramp - MOT Plan Rick Durr, PE 561-383-5400 2007 Malcolm Pirnie West Palm Beach Water Tank Structural Observation Jane Hardesty 954-761-3460 2007 Broward Housing Authority Highland Gardens HV AC Design Beth Kinsey 954-739-1114 2007 Town of Southwest Ranches C-11 Multi-Purpose Bridges Design Build Criteria Carl Huntsberger, PE 954-434-0008 2007 City of Hialeah Annexation Area Inspection Services Armando Vidal 305-883-5800 2007 Palm Beach County Haverhill Road Box Cuvert at EPB-10 Canal David Young 561 684-4149 2007 CM Risk-Rehabilitation of Atlantic Blvd & Parker FDOT District 4 (Hardesty & Hanover) Bridge Mike Seleno, PE 954-835-9119 2007 Williams Paving, Inc. Monterra Traffic Control Plan Elliot Eichel 305-882-1950 2007 City of North Miami Water Treatment Plant Splitter Box Evaluation ESI Consulting Engineers Igor Gonzalez 305-418-9177 2007 City of Lauderhill Old City Hall Complex Drainage Support Juan Martin Cala, PE 954-739-0100 2007 FDOT District 4 (Earth Tech) 1-595 P3 Phase 1 Ray Rivas, PE 305-492-4800 2007 City of Miami North Bayshore Drive Operational Improvements Ana Arvelo, PE 2007 City of Lauderdale Lakes Library Community Center Owner's Representative Gary Rogers 954-676-3622 2007 m R.J.Bf!har & Company, Inc. Project List and Client Contact - Page 10 Current Projects: Bold Completed Projects: Regular Font PROJECT NAME CLIENT NAME/CONTACT PROJECT STARTED FDOT District 4 SR 5/US1 (Boca Raton) Vanita Sharma, PE 954-777-4468 2006 Palm Beach County Congress Avenue Bridge over the L-14 Canal David Young 561-684-4149 2006 City of Hialeah W. 36 Street, W. 36 Terrace, W. 37 Street Jorge Hernandez 305-687-2668 2006 City of Ft. Lauderdale (Keith & Schnars) NE 33rd Avenue Construction Management Hal Barnes, PE 954-828-5074 2006 FOOT Central Office (C3TS) Exfiltration and Injection Well Manual Rick Renna, PE 850-414-4351 2006 Deane Krakower Krakower Privacy Wall Robert Behar, PE 954-690-7771 2006 Broward Community College Tiger Tail South Side of Lake Parking Mr. Francisco Hoyos 954-201-6975 2006 Rock-Kim Miramar Miramar Town Center Headwalls Tom Good 954-602-3000 2006 Village of Wellington Flying Cow Road Roundabout Gary Clough, PE 561-791-4000 2006 City of Lauderdale Lakes Westgate Parking Layout Phil Allyene 954-676-3622 2006 Miami Dade Parks and Recreation Structural Inspection and Survey Li Gurau. Ph.D., PE 305-755-7834 2006 Hollywood Boulevard/SR 820 (US 1 to SR FDOT District 4 (Sanchez-Zeinali) A1A) Frank Panellas 305-477-4467 2006 US 1 (Young Circle to South of Sheridan FDOT District 4 (Sanchez-Zeinali) Street) Frank Panellas 305-477-4467 2006 FOOT District 6 (Lichtenstein) Krome Avenue Bridge BHR Ricardo Salazar, PE 305-470-5264 2006 FDOT District 4 SR 5/US1 (Deerfield Beach) Priscilla Morales, PE 305-375-2960 2006 City of Sunrise Sunrise Lakes Blvd Intersection Improvements Alan Gavazzi, AlA 954-572-2487 2006 Palm Beach County Lawrence Road over Boynton Canal David Young 561-684-4149 2006 City of Hialeah Signing and Marking Plans (Various Projects) Jorge Guanchez 305-883-5800 2006 Miami Dade County Public Works SW 176th Street Priscilla Morales, PE 305-375-2960 2006 Lennar Homes Cambridge Park Jody Evans 954-370-0003 2006 Lennar Homes Isles of Oakland Park Jody Evans 954-370-0003 2006 City of Miami Buena Vista Height T atiana Acosta 305-416-1263 2006 Signing and Marking Plans E. 33rd Street, E. 7th City of Hialeah Avenue Jorge Hernandez 305-687-2668 2006 OGT Trails Inspections Town of Southwest Ranches Bert Wrains 954-434-0008 2006 m R,J,Behar & (ompaI1Y, In" Project List and Client Contact - Page 11 Current Projects: Bold Completed Projects: Regular Font PROJECT NAME CLIENT NAMElCONT ACT PROJECT STARTED Collier County (Greenhorne & O'Mara) Immokalee Road (CR 846) John Adler, PE 561-686-7707 2006 Palm Beach County Roebuck Road, SR 7 to Jog Road David Young 561-684-4149 2006 Broward County Housing Authority Air Condition Assessment Beth Kinsey 954 739-1114 2006 Signing/Marking W. 45th St. W.45th Terr., W. City of Hialeah 2nd Ave. Jorge Hernandez 305-687-2668 2006 City of Hialeah E. 4th Avenue Street Assessment Jorge Hernandez 305-687-2668 2006 Bergeron 1-595 Signage Coordination Ron Bergeron 954-680-0223 2006 Bergeron US 27 Rt. Turn Lane Coordiantion Ron Bergeron 954-680-0223 2006 Palm Beach County Central Boulevard Bridge over the C-18 Canal David Young 561-684-4149 2006 City of Hallandale Beach (HDR) Transportation Master Plan - Traffic Counts Mr. Marcus Arnold 305-728-7400 2006 Town of Southwest Ranches Southwest Ranches Permits John Canada 954-434-0008 2006 City of Lauderdale Lakes Citywide Swale Restoration Project Manny Diez 954-535-2815 2006 City of Hialeah Bucky Dent Park Drainage Analysis Jorge Hernandez 305-687-2668 2006 Palm Beach County Congress Avenue Bridge over the L-16 Canal David Young 561-684-4149 2006 City of Hialeah NW 97th Avenue Construction Management Armando Vidal, PE 305-556-3800 2006 Old Boynton Rd from Congress Ave to Boynton Palm Beach County Beach Blvd David Young 561-684-4149 2006 City of Hialeah Truck Wash Building Certification Ray Zamora 305-333-8158 2006 City of Hialeah 5th Street Fire Station Structural Design Jorge Hernandez 305-687-2668 2006 SFWMD (Malcolm Pirnie) SFWMD North Region Inspections 2006-2007 Victor Hulburt, PE 407-660-1133 2006 m R.J.Behar & Company, lnc. Project List and Client Contact - Page 12 THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. ]. This sworn statement is submitted to City of Sunny Isles Beach by Robert J. Behar, PE for R.J. Behar & Company, Inc. whose business address is 6861 SW 196th Avenue, Suite 302, Pembroke Pines, Florida 33332 and (if applicable) its Federal Employer Identification Number (FEIN) is 65-0954070 (IF the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: N/A 2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud. theft. bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287 .133(1)(b). Florida Statutes means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or infoffi1ation after July 1, 1989, as a result of a jury verdict. nonjury trial. or entry of a plea of guilty or nolo contenders. 4. I understand that an "affiliate" as defined in Paragraph 287.133(1)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity come. The tern1 "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an ann's length agreement shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which othef\vise transacts or applies to transact business with a public entity. The tern1 "person" includes those officers, directors, executives, partners. shareholders. employees. members. and agents who are active in management of any entity. 6. Based on infomlation and belief. the statement which I have marked belo\v is true in a relation to the entity submitting this sworn statement. (Please indicate which one (1) of the following three (3) statements is applicable.) L (1) Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(2) The entity submitting this sworn statement, or one or more of its officers, directors. executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. (3) The entity submitting this sworn statement. or one or more of its officers, directors. executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or agents who are active in management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. However, there has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer detemlined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attached is a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH I (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT TN EXCESS OF THE THRESHOLD AMOUNT PROVIDED TN SECTION 287.017, FLORIDA STATUTES FOR THE CATEGORY TWO OF ANY CHANGE TN THE INFORMATION CONTAINED IN THIS FORM. 3 [71- SIGNA TURE OF AFFIANT Robert J. Behar, PE (Printed or Typed Legal Name of Affiant) State of Florida County of Broward Sworn to and subscribed before me this 21st day of May .2010by Robll-t- ) . ~ko. ( ~~ Notary's Name Printed, Stamped or Typed Notary Seal: Personally Known: ~. or Produced Identification _ L1ZANNA KAOIR ~~~~.p MY COMMISSION #DD862979 ~ i J EXPIRES: MAY 13, 2013 ~'I'~ge; Bonded through 1 sl Slale Insurance Identification Produced NON-COLLUSIVE AFFIDA VIT State of Florida County of Broward Robert J. Behar, PE and says that: being first duly sworn. deposes (I) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has submitted the attached Bid; (2) He/she is fully infonned respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; (3) Such Bid is genuine and is not a collusive or sham Bid: (4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired. connived or agreed, directly or indirectly, with any other Bidder, finn, or person to submit a collusive or sham Bid in connection with the Work for which the attached Bid has been submitted: or to refrain from bidding in connection with such Work: or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, finn, or person to fix the price or prices in the attached Bid or of any other Bidder. or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy. connivance. or unlawful agreement any advantage against the City of Sunny Isles Beach, Florida. or any person interested in the proposed Work: (5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or paJ1ies in interest, including this Affiant, ~ ~ c1../-A--- Robert J. Behar, PE SIGN~~URE OF AFFIANT (Plinted or Typed Legal Name of Affiant) State of Florida County of Broward Sworn to and subscribed before me this 2151 day of May .2010 by \{~0-ev-\ j. h~v l1<~ Notary Seal: Notary's Name Printed, Stamped or Typed Personally Known: -/ or Produced Identification ,.<;~~.P'(,..... L1ZANNA KADIR (f:E:,<-;;' MY COMMISSION #DD862979 \~'~ <Jcl EXPIRES: MAY 13, 2013 ..,..'!..~:t:i.t"" Bonded through 1 5t State Insurance Identification Produced Addendum No. 1 CITY OF SUNNY ISLES BEACH RFQ NO.1 0-04-01 - Professional Engineering Services RFQ NO.1 0-04-02 - Professional Architectural Services To All Bidders: Bidders for the above-referenced projects shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise. 1. Mandatory Pre-Submittal Conference Minutes (Q&A) May 5,2010. 2. Sign-In Sheets from Mandatory Pre-Submittal Meeting. ilddendum No.1 Mandarory Pre.Submittal Conference QA OS05JOPage 1 of 6 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Mandatory Pre-RFQ Submittal Conference Summary Minutes Wednesday, May 5,2010 at 10:00 a.m. RFQ No. 10-04-01, Professional Engineering Services, and RFQ No. 10-04-02, Professional Architectural Services City Manager Rick Conner welcomed everyone and asked everyone to be sure to sign the Sign-In sheet that is going around as this is a mandatory meeting. Assistant City Manager/Services Jorge Vera, Assistant City Attorney Fernando Amuchastegui, and Assistant City Clerk Mauricio Betancur were also in attendance. The deadline for submission of Request for Qualifications documents is Wednesday, May 26, 2010 at 2:00 p.m. for RFQ No. 10-04-01 (Engineers) and at 2:30 p.m. for RFQ No. 10-04-02 (Architects), at which time those sealed responses wiH be publicly opened. Any additional questions are required to be in writing and may be submitted up to seven days before the opening (at the close of business, Wednesday, May 19, 2010), which will be answered and placed on Demand Star. You may email themtoCityManagerRickConner.atrconner@sibfl.net. or fax them to 305-792-1561. City Manager Conner said we are looking for a very brief response, which is the reason for the 10- page limit. If you can't tell us in 10 pages why you are a good firm for our needs, you missed the point, we are not looking for fluff. He said that the people who will be looking at these responses, have technical backgrounds. He mentioned that if you think about the mechanics, we have to go through all of these, and there are about 80 people in the room, and those people who get to the point and sell us immediately, are the ones we will be impressed with and pay a little more attention to. The 10 pages are a description to the City of what services you can provide, you do not have to provide all services, we are not looking to select a firm that can do everything. Tell us that you do geotechnical, structural, etc., tell us how you do it well, and there will be multiple firms approved. When we have projects that fit those categories, we don't have to go through a long RFQ process just for a small project. If you can't handle a small job and give us response that shows you care about our City as a client, that is fine. If you have other big clients somewhere else take care of them, but we want somebody that is looking out for us. This is sort of that little test process that says you are interested in the City, you are willing to come here to the City and give us great service on our projects, get us through them, and then we move forward with you on to the next one. That is what we are looking for, you do not have to submit as a complete umbrella firm. A lot of people have asked if they should get subs, no, please don't, we want to know what you do, and we will select firms based on our needs, and who can fill those needs. When we have a specific large project it will go through a separate stand-alone RFQ process. Mr. Conner said that you can substitute Form 330 for the 254 and the 255, and it does not count toward your ten pages. The required backup documents do not count toward the ten pages, but your firm, your people, what you are going to do for us, that is the ten pages, and then if we need to verify, the backup is there. We are not going to automatically read those forms. but if we think a firm really Addendum No.1 Mandator)' Pre-Submitral Conference QA OSOSlOPage 2 of 6 meets our qualifications, then we will dig deeper and look into those forms. QUESTIONS AND COMMENTS FROM PROSPECTIVE BIDDERS 1. For the 10-page limit, the business financial statements and annual revenues, would that be counted towards it? No. The financial statements are also not part of the ten pages. 2. What format do you want it in? How you make your presentation is up to you, you know best how to sell yourselves. You know what your skills are, you know what is going to make the best impression on us. We want to use the free-form approach because it gives you a chance to shine. If we give you a very particular format, it may not give you a chance to show us what you can really do, and we don't want to limit you, so whatever is best for you, please use that approach. 3. How many firms will you be selecting? We don't know. If it takes 20 firms to give us the opportunities that we need, it will be 20 firms. If three firms cover it, it will be three firms. Last year we selected two architectural firms, and one of them did a small project and did not satisfy the City, the other firm did very well. The firm that did well picked up other small projects and are now doing larger projects. 4. Can we create our own 330 Form? No. Please use the existing forms so there is consistency. 5. If you are selected as one of the companies on this list, are you prohibited from submitting on the larger projects that the City undertakes? Absolutely not. Again, this is kind of that chance for the City's benefit, this process serves two purposes: 1) we have got a list of people that have gone through the process, and in this City we like things done quickly, that is the driving force here. That is what we will be looking for, how quickly you react and give us services, and so this is a great opportunity for us to get jobs done quickly because all the legal processes have been accomplished and we can get on with doing the job; and 2) again, it gives us a chance to see who is going to give us better service on the larger projects and so quite the contrary of eliminating you from the larger projects, it gives you a foot in the door. This is a golden opportunity to be first up on the list for the larger projects. 6. If you have a project and, we are a Mechanical Electrical Plumbing (MEP) sub-consultant to an architect or a civil engineer, if he is hearing you right, we should submit prime, and let's say there is an architectural project that does require a sub-consultant, will you put the teams together? Typically no, unless it is a small project that we know we can just pull a couple of people together. knock it out and move on. Anything that has got any rea) meat to it, we don't want to force you all into a marriage that may not work, and so we would ask whoever we select to pick their own people. We might say, here is a list of people that we have already approved but we would not force it on you. ,~ddcndum 1"0. J Mandator)" Pre-SubmlttaJ Conference Q.o\ 050510Page 3 016 7. And the architects and civil engineers should not include MEP on their teams? No, unless you have those in-house services. Again, the idea is: what can you do for us? If we have a larger project, a bridge for example, we will need structural people, environmental specialists, etc, and you would go pick the team for that project. For the small ones, for instance where we just need someone to do another entrance at Pelican Community Park (PCP), we would pick a consultant from the list to do the work for us and we are done. 8. On number 6 you are asking for proposed personnel assigned to the City, the City's various potential projects including their qualifications and experience, is that the resume? What we are saying is, it doesn't matter if you have all these great people if they won't be working on our project. What are you going to do for the City with whom, and that should be in the ten pages. 9. Resumes will not be part of the ten pages, is that correct? The resumes will be part of the ten pages, if it is part of the 330 or any of the other required forms, if you have to submit that as part of the backup package for the firm, that is fine, but what we are looking for in the ten pages is: who are you going to send to us and tell us why they would be the best person to hire for the job. We are not looking for the firm name, we are not looking for the national offices, these are one-on- one issues. Our approach to this is that when we start, we are a team and we will be there for you and we want you to be there for us. If you do good work and you support us, we are the best people on the planet to work for, if you don't we are not. So if you have heard good or bad things we probably deserve both. If it is a firm that has not given us what we feel to be good service, then we are tough to work with. If you do a good job, we will take care of you but it is your response that counts. We can't say that enough, it is response that counts. 10. Tabs and cover pages do not count on the ten pages? No, and again, the old joke in English class where the professor threw up the term papers and the one that hit the floor first was the A, and then he graded the rest of them on the curve depending on how quickly they hit the floor. We do the exact opposite. We have found that people who really know what they are doing and are really good at what they are doing, can tell you that very quickly. People who depend on fluff and a lot of verbiage may not be as good at their jobs. We are going to have a lot of these to go through and we are looking for real service, and again, the people who are looking at them have a very good understanding of what they are looking for, so please don't waste your time or ours. Take your ten pages and run them ofT the Xerox machine in black and white, the glamour is not what we are looking at. The pretty covers and pictures are not going to be anything that is considered, it is the text. When you submit your packages, do not bind them, do not put them in a folder, don't staple them, just use a clip or binder clip, that makes it easier for us to go through them. .'\ddendum No.1 Mandato,"y Pre.Submlttal Conference QA tJ50510Page 4 of 6 11. With all the attachments that are there too, you want all of those unbound as well, and all one big clip, or do you want all the financial statements separate, etc.? Put them all together with a clip, and put the ten pages on the top, and everything that substantiates it underneath, that way we can quickly go through them, it is a little easier to store them. etc. 12. There is one original and four copies, and all five are unbound and clipped together, is that correct? Yes, that is correct, and then we can hand out those copies to the people who are reviewing them and then they can go through them very easily. As a side note, when we did this last time, a lot of firms would call up and say, when do I get my job. This is not one of those rotation things, what we are looking for are specific services. If it turns out that we didn't need a structural or a geotechnical that entire period of time, then we didn't need it. We will use you if we get the chance. It also tells us that you are a firm that we like, and so when someone submits on a larger project and they need a structural, and we thought you were a good structural and we look and see you are a part of their team. That can be a plus, and so it is not a loss even if we don't necessarily use you under this program. 13. What is the duration of these contracts? Our desire is to have them go for about two years. We are still working with the City Attorney's Office on that. We have had that discussion and we will finalize that. 14. Will there be individual negotiations for the fees and the rates? Yes, obviously your professional services are guided by law, and we will follow those regulations. 15. Are you going to email out a list of the today's attendees? We do everything on Demandstar.com, and staff is wonderful about getting the information posted. They will have the list of attendees and the minutes posted on Demand Star fairly quickly. Do not call and ask if we have it yet because if it is not on Demand Star then we don't have it yet. The moment we have it we will post it. Just keep checking the site. 16. Do you anticipate having any federal funds and do you anticipate to use those through this contract? Again, the reason this group is here is for projects that we don't even know we need yet. If it is a large project, we are going to have a specific RFQ process for that project. The whole point of this process is that we don't know what is going to come tomorrow and we want to be try be prepared. 17. Have you received federal funds recently? We are finishing up a project now on federal funds, but again, those are the larger projects that we will go out specifically for. Addendum No.1 Mandatory Pre. Submittal Conference QlI OSOS10Pagc 5 of 6 18. How does Demand Star work? If you subscribe to one municipality you are able to see all the notifications, all the addendums that are put out by that municipality. There is no fee, however if you want to register with more than three municipalities, then there is a fee for that. If you subscribe with this City, the minute we put out the minutes, addenda, etc. you will receive it within a few minutes of it being posted. The City has now instituted payment of invoices once a week. Again, you are not going to get rich off of these projects, they will not be coming at you every day, but it is a great opportunity to get your foot in the door, and show that you are the company that we want to deal with on a regular basis. 19. Do you have a set cap for the projects that you put under your continued contracts, fee-wise or construction value wise? No. We look at the individual project. Some of the little projects that are on that list have graduated to some fairly hefty projects, but they were the kind of projects that we just needed this done. 20. What is your typical construction delivery system, at risk, low bid, etc.? Typically it is a hard bid. We are not opposed to the Construction Manager At Risk (CMAR) or design build or any of the other opportunities, but if we've got something that we are looking at under those options, it is almost certainly going to be a separate project. In closing, if you have any questions, just drop us a line. When you are submitting your proposals make sure you clip them and not put them in folders, spirals, or binders. Do not leave the room without signing in because if your name is not on the sign-in sheet, you are not eligible to submit. So it is really important, make sure you get your name on that sheet. The mandatory Pre-Submittal Conference was concluded at 10:41 a.m. Addendum No 1 .'-landatory Pre. Submittal Conference QA 050510Page 6 of 6 SIGN-IN SHEET PROJECT: Engineering and Architectural Services Pre- Submittal Meeting DATE: May 5, 2010 CITY STAFF: Rick Conner, City Manager Jorge Vera, Assistant City Manager Mauricio Betancur, Assistant City Clerk Fernando Amuchastegui, Assistant City Attorney FIRM NAME: ~J,~g n.:fr<)>4IC I E~I-1E1-L 0 A::fAI-'1IL <; PAe'T t--l~5 REPRESENTATIVE'S SIGNATURE: o ~ &;.f\S- H~)~I REPRESENTATIVE'S NAME: ( <WA1> MAILING ADDRESS: <!) 2bor SouTH B-A'T'SHoP-E DelVE:, SUITE 100'0 ,.....trAMI J FL. =3>51~3 @ z. 701 fOv1ce. tJ~ ~ 1;>/ V~I/~te p/>O CPv--d bak-.3j fl .33\ 3+ E-MAIL ADDRESS: FTIl~Sl' @ Be e M'~LLO A3 .AI-1IL, CO...., FIRM NAME: f?t:f ~'r/n &) f ,;J~ tJr>n.h1e.fJ''d ~/nU/Y'.s/ Inc. . REPRESENTATIVE'S NAME: NaJ// /YJ~ .I){~ ,; PC. q~r;:r i~ ~d>?jrAeh REPRESENTATIVE'S SIGNATURE: ~ciQ - MAILING ADDRESS: 7/7/ SW 62nd iJv~ 4~ FIa:5Y .- M' t PL ,33143 1~7/, , E-MAIL ADDRESS: dya:/Y'JueO (iVf4-m/~Jn/' ~rn FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: 7r~ /)~~~ REPRESENTATIVE'S NAME: ~4'r/~ .c/. iBt./~ ~ REPRESENTATIVE'S SIGNATURE: ~ MAILING ADDRESS: 'frdJ p~~ 17/~D U/I/'? ~ ~~Z~ E-MAIL ADDRESS: ::7V/1/IY ~~/ r7~ 77/60 ~~c.-I:-~e O~~ FIRM NAME: . ljVS ASSbCld+es REPRESENTATIVE'S NAME: 1-9Zorv A. C9~'ZOn !yea Idlt H~rfln REPRESENTATIVE'S SIGNATURE: /y ~.d:Jr:~ - MAILING ADDRESS: :2/~1 Fbnce de- kc;n blvd. Sui1.e G/o e::, r~ I GaJd~ .:fL- ~/~4 , E-MAIL ADDRESS: lYn4rf/n @ tlYS.J1eT FIRM NAME: WL ~trr~ur\e. t ~~'i f?,A, REPRESENTATIVE'S NAME: ~rt7~ V-G-lt~ REPRESENTATIVE'S SIGNATURE: y MAILING ADDRESS: 111 0() '; \y ");-1 I<<:.. J k+J.n~ ~ lO f1J,AMlJ ft- ??(~~ E-MAIL ADDRESS: NVfJrA~ ~v'/.-~.U11 FIRM NAME: ~AVIER- fl,ptJ QUff Z REPRESENTATIVE'S NAME: R JB~ c{ t6-. IJJc. ~ REPRESENTATIVE'S SIGNATURE: /'~ , t:?' MAILING ADDRESS: 00&( SLLJ )SG AYIZ- I::::XJ rJ1:- 3oe. PM~ f? utfJ FL- :3 :3 3 52 E-MAIL ADDRESS: J. [o0116U.Ez:. @~~/k. (!.o y FIRM NAME: --rhe. ~ usse II 7q( -tn (r 5 h.l'p) -Ln c. REPRESENTATIVE'S NAME: H Q( Q e I q C uVVl (rc)(\ REPRESENTATIVE'S SIGNATURE: ~ MAILING ADDRESS: /4:1 <6 S VV 4~ Sf t--1,'Qm I) ~L 33155 E-MAIL ADDRESS: mQcae1q €2+r-p-,'nc.(orY\ FIRM NAME: REPRESENTA TrvE'S NAME: t-/,,6Rv~ JOLLY, ING. lYs118 v: btxJJ r; ~I IN- CoMM~t- f.::::.LVb ~ SofIe 225 REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: ~~: fl-33?o1_ E-MAIL ADDRESS: y LONbaJe)'~V#OJoL.l.-'(. CoM FIRM NAME: COaJ+u! r -femJ -:Mf. ;;;, ( IJlJdm ~ REPRESENTATIVE'S NAME: f cAres (Jerez. ~ (. Lf tII 5tiJh tJlAI e ~ (crt./6/k1 rT 351'1' E-MAIL ADDRESS: opere<-@ cQCnkI SjS-kmfillt, (O~ FIRM NAME: / {!At...V/-V 6/6 <,;~A!lID E A. s--r-o c/ ~'TcS / REPRESENTATIVE'S NAME: 7C ,~y'c:()<-;:.z= , ~ D vc6 L.--4 S REPRESENTATIVE'S SIGNATURE: ~~(-, ~ <<:. /?f~ (J MAILING ADDRESS: /S:6d -t::u f -'t ~~)V~ ~;r-: Lfi-u ~ e /( /J--1 L-t: , ,cL 33 3/ L / E-MAIL ADDRESS: c/ 1-04'1 I urC? ce-.,) Vr-1. - 8(~ rdc."lb . c""--v\... FIRM NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: '6\S- ()L-J 5}~f1v-€-1 ~u;k4ucJ (y\'\8fY\',, FL ~6' d-b E-MAIL ADDRESS: +COc...J~:. b V (Yl @., ~c..c..o(lS,) 1+. c.ulY\ FIRM NAME: SBLH Ayrch'\te.c-t-~ REPRESENTATIVE'S SIGNATURE: rNs(ohe.n REPRESENTATIVE'S NAME: ~(a fautu. ~ MAILING ADDRESS: 1\4'bD N. ~ \)yo *~}D E-MAIL ADDRESS: \-\,~ ,fl 3~\1L, S 4/2-1J~ j c.che-n@, 5b\ YY). corn FIRM NAME: f C-r;-S Consu.J2+Un+S, nG. REPRESENTATIVE'S NAME, I / . ~ Ii .. () "7 )0 ( D/YlO r 0 K ocJ,LU 9lA..1<C '-- REPRESENTATIVE'S SIGNATURE: J / r;) ~. Xex E-MAIL ADDRESS: I Lf 3& ( CoJ.--f I---f J. ve.2 Sd~ /03 l 0 J ) (7. 33bllp P--'t tOW I La (.....eS/ r- r ~ c..e.s c.c>r15lL { -t-: Cc::-s I n+a ~ MAILING ADDRESS: FIRM NAME: REPRESENTATIVE'S NAME: ~E (j)A\J1 ~'i J~oM MAILING ADDRESS: REPRESENTATIVE'S SIGNATURE: ~ l20,Q~~~ ~f--r\-\- lOOJ~ " 4w ~ ~ -zfL %\ E-MAIL ADDRESS: \ Q.frtj . j~<\hQ!1 t a~(JA11. Cool I I I FIRM NAME: )!C~;'M *~" c 'JO..i~.s / :z:"c. REPRESENTATIVE'S NAME: cJo/lAl ,P ~/h REPRESENTATIVE'S SIGNATURE: ~?r MAILING ADDRESS: ~5oo VI u..4~ E:. Sbu'-~vl4~P 5u/1r.. 1"3 l.AJfi:.Sr P IrL.llA. St A-cJ.l / ~PIf1 3$9(> ~ E-MAIL ADDRESS: JOJ-lN . l:::/M @./II1CMTIl.).IJS. c:.c)~ FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: ~c/h I 'kJ-s 6e-1t- :C:-i/i> c:.. , l REPRESENTATIVE'S NAME: ,!:::I;" ~~~1- v I v.&j 50.. <3 <t..rvn /::; Ju n.-, REPRESENTATIVE'S SIGNATURE: ~Vfv f f kpvl. 2Sqt.J;v~1 , MAILING ADDRESS: ~ Arch'~~ J!) 7 5 jJw S <7 .;f1-, ;:z; tI ~ ,~. (h (A:h--- I , FL- 3'3/<-/2- 305 <j~{ - ~o 5'3 E-MAIL ADDRESS: 1# ~;f::".. Ct <<"~, -; ~ In-, eJ ha..a./o, ~ rn qh @ hUA-/' I C;i'rn FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: ~~li c" &- lhu" t' ~ ~, '<2..,0<5(... , In C · REPRESENTATIVE'S NAME: .. d:t..ooL ~oRo 'c.r 8~o ~v t MAILING ADDRESS: \ ~o b ~. ~\Qrn\t'<ru e~ . ?Gm bWk.c ~;~) Fe 3~o-vg \ ~o~ N. ~\",~,'Y" ~ ~~, ~ \?'-~\\'IU \,f" f) ...t n ''-'--..> 1--,' . v ) ./ rc 3]0<-' IL ADDRESS: , l~oJL.e "1o-\\Q en FIRM NAME: -=Fi ,/)t-e M~i0 Jl As.s 0 G/aJ-c;vS ~:r 71 c. · REPRESENTATIVE'S NAME: rvA:-n ~~n~'<J~ NATURE: (\ ~. MAILING ADDRESS: )O'QoS NW 41 Sf-fee\- E-JJ6; L 1'l-1jr?Y'-l P/t0.;!+8t!? {Y-c;/op;a/), CO/0 '5 v) 1-0 200 M\~N) ~\OR\~ 3?>1l0 fNOflc (303) S9\-~l7) E-MAIL ADDRESS: fU11Y-..yM-vDS 6)-,(, a/(JJ7):::If}. CeM FIRM NAME: ~Kl~~-\- W)U- REPRESENTATIVE'S NAME: Y00~ 'f'J\ OC>~ REPRESENTATIVE'S SIGNATURE: ;r- MAILING ADDRESS: BOb '"DDU~~ --e..~ I s~\'\E- 30a ~ 9 ~L.C-s. I ~ L-- 3~\3lf E-MAIL ADDRESS: Y00N9' ~c~@_:B::~\<lN..~'U--, ~ FIRM NAME: - ~h'S;5h + UeSl'5 V) REPRESENTATIVE'S NAME: HQI" l~eJ PCif"Ct REPRESENTATIVE'S SIGNATURE: ~ MAILING ADDRESS: ;QS5 NW J7 0 I/e H{QYYJ) / FL 3 3 -):;l.f::;>- E-MAIL ADDRESS: rn pc< v ya @ IrI S tJJ-,J-c1t"s <5 1'1' U 5 FIRM NAME: [ac.Skrn Grg\~rl~ ~(6..)p REPRESENTATIVE'S NAME: '128 \SS ~ LO~~ REPRESENTATlVE'S SIGNATURE: e- MAlUNG ADDRESS: E-MAIL ADDRESS: ~~Ol nl u 8 ~ ncL Jj()~ 50"1-\c-- 3i-O gI' 33\d';> (a\~02ee8o-te:r(}e-8 . caq() FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAlUNG ADDRESS: E-MAIL ADDRESS: FIRM NAME: fur21Q + O'Ef:D~de-E REPRESENTATIVE'S NAME: Not-oliO r1CfC1l0 REPRESENTATIVE'S SIGNATURE: ~ r1or-~. MAILING ADDRESS: 2{X) S. 61':::D OyrJ!., B1 vel 5k- ReO n lGfYl I ft 3315} E-MAIL ADDRESS: (lrYDr-c(1~h=>~rkds; . GL)vf) FIRM NAME: Plor/do-. T hAn SF r-f:p..,-ci"VI &, ~i YleeY"i~ I me - I REPRESENTATIVE'S NAME: JUC41 G..{~1-1 REPRESENTATIVE'S SIGNATURE: arfr~ MAILING ADDRESS: 1-<=]55 N t() /2 -bl, $t:. ~te 41~ Doro..l I fL 3312.{, E-MAIL ADDRESS: j co.lderon~ .{f:.e (fie. net. FIRM NAME: W f(l~I1a( lob-o-bries} Ire REPRESENTATIVE'S NAME: - Wi~efter Ghllf)-'!Ou. J,'II REPRESENTATIVE'S SIGNATURE: AW UJ. ( D MAILING ADDRESS: Rf Q - [nS\rJe.e.(jno \860 ~E.. 144 st-rft+ " 'yy --\--h \'--\\Cml ~ f=L '33 { '8/ E-MAIL ADDRESS: ~Il~ WI{)3erter!Qb, CdVY\ FIRM NAME: I \00\~(~ OlvOJ'Q < Po { f--n tr-s I REPRESENTATIVE'S NAME: ~UOt6i G net Is I REPRESENTATIVE'S SIGNATURE: ~~~ MAILING ADDRESS: \5C:O Son~ ~. ~1.e ~Oo ffiaJGC1~ , r=-( . 3~1~ , E-MAIL ADDRESS: YCOrA Is: f L20\~I~f/4a'VO(e2 , ~ - FIRM NAME: ~\t-\LP{-\\z,W ~ ~~~~I ~f'-JG REPRESENTATIVE'S NAME: ~ ~-e.!. ~\O{~ ~'Sk:rJ REPRESENTATIVE'S SIGNATURE: Jli1 ~ MAILING ADDRESS: 4~\'~t t::~~\).:~ D~ vJ~f ~ ~ 8- ~ *df E-MAIL ADDRESS: ~ . ~ ~K(J;.I( - ~,JI Co-{ FIRM NAME: 8VU GNti I ,J(&t, r--\tf, REPRESENTATIVE'S NAME: ?\tJ.\'t, N ~~ REPRESENTATIVE'S SIGNATURE: -~~ C~-- c -.- MAILING ADDRESS: 1 !100 0. IL6i VAlL OIL. ~ 400 f41~t fv 2:,~ 1 ~~ E-MAIL ADDRESS: She.b.nv!B b",ce.~. ~M. FIRM NAME: tf24/b? /). ~JA1 rr# ;4v.1"J.4 5Sinri1P- REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: /771 tfl LApE S f.o,4,p ) ~[11 rC <4 J 0 1hA JMoJ f L- ~~414 I E-MAIL ADDRESS: 46M 1m- r2 ULA-/ If ~1-41 T1I l C 0 ~ FIRM NAME: SUY'.- -r Q.Gh [ r-.q', V\Q..U- ~ 1'\y REPRESENTATIVE'S NAME: W 't\ \\o.,fY' C. l~ P s ~ M\c1~~j f~ REPRESENTATIVE'S SIGNATURE: ~C~ MAILING ADDRESS: p (lr LlilitJ I b 00 W. ()~k-\ (,.,J f ()\'1 t-fYvcJ.Q..C'rA ~~ ~ ) f L 35311 / E-MAIL ADDRESS: d; f'> @, 5u (J~ch 1LV\3 . CO'"" FIRM NAME: po (t,S '?<.f Hv,o~DH i,A~~LStI yve REPRESENTATIVE'S NAME: E /.. I z,A be- n./ !,r or tz..DWS~ / REPRESENTATIVE'S SIGNATURE: ~6?h /?= ( -s - MAILING ADDRESS: /Po >" e 3I'J.P ,Ave 5u/~ zfoa Ht'Lr l-.AVR t: ~/ A Yt.... 333"74- '" E-MAIL ADDRESS: e.r' o+rows)Lf" & dJ..fy-tJrd" Uln-"\ FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: Meey ~V\~YlC\-+\ ~V1Ct \ REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: Coy Lra s 'i(// r()rl(le ~ &OVl rp)uof. aVcJ ~L/e;s,. ~L ?3/3y' G LrO?~Z- ~eKyl. CbN1 ~s~v~~ ~JM+~ REPRESENTATIVE'S NAME: ~'- ( $1).. ~'^ U I m en-cJ.; REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: ~~~ / b 0 PJ. ts I' S(!Juj (J e t!J. vi dfl h- --1Y\1 ~ I .p J.. 33 J"3 Q. ~d,~ Sr!--ov i d. ~ FIRM NAME: tJl ~lhlC. crJ~(jJt~tJb / I nJC REPRESENTATIVE'S NAME: EjJrl6)Ut::- A~GLD REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: l~ L1-A?? t? (J) ( ~ (~ ~-r- 1:J I~ - ~L 77;718(., E-MAIL ADDRESS: ~~N16L-t> e)/l@ JC, FIRM NAME: \JercD C()8i~no REPRESENTATIVE'S NAME: Iflo h J)uJni 5 - s~Yl40-- REPRESENTATIVE'S SIGNATURE: ~~~ MAILING ADDRESS: 4qOl NLU (1-th 4 Suite ~ 4 b\ ~ LAuW~J 1=={. 33:3'.)~ 1 ( '1S\) q~-11l- 3<::62- 11\-3053 ~ E-MAIL ADDRESS: ~~~~p.~ FIRM NAME: ~ ~t.+-J ~~f; LA-C REPRESENTATIVE'S NAME: ~D..~lc p ~\ j2.10D1' ~ REPRESENTATIVE'S SIGNATURE: -==- MAILING ADDRESS: I "2. -z.. , ~V\.I 2..-, ,..... \/1='[ . ~ ~ -z,cD / l.-i I ~ tv( I , 121..o~D~ 3i""?l ~<<; . E-MAIL ADDRESS: ~1~~O\'~ (8 ~~?-JWVP. tV6T D<4~~ e ~03'S\~c..-,l2-DvP. 1'05\ FIRM NAME: \J\j 0- \ \. Q;'f: S. ~ ~c.. '(::. y~ CI... ASS OCi ~ tes REPRESENTATIVE'S NAME: o S(~ '(' ~<\.~\-\'-'\.~ t. REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: 6:2.0 Sf \St Sl-ye.e.t r= t. L~v~~'\d~ \Q.) r L 3 ~~t) \ E-MAIL ADDRESS: os,c~'('\v 2Q't: \oe\\s,00--\ "'. \I\Q l FIRM NAME: ~ t=: vJ M ( ~D,.J l c..)~ 5JC;(0fXl2J.~~ bc:-s Lc; ~ C..c:.~S (.) Q'7'\"").J REPRESENTATIVE'S NAME: E 2E-~~D~ f-k-n~~ REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: 4-8 ~ 8 s0 7 2- ~~ A\fEN 0E;:- VV\ l tA::u..-u. ( ~M S 3 I~ E-MAIL ADDRESS: ~O~CE: N M...1CENC} _ ;Se:-r- z. l-k~ R-t c.J'- <2 N ~ L.E:10C; - ~ €"r- FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: \-\. W . LD Gt+ N t?~ REPRESENTATIVE'S NAME: ~\7Wlr-J F. \~ o:s c f.-Jfb- 'f't- ) REPRESENTATIVE'S SIGNATURE: ~~ MAILING ADDRESS: 4~o ~PvJ~~ ~rup P)LW1 "7T6 r*)O& ~U tJl71?6' 1 FL "?~25 . E-MAIL ADDRESS: eArY10j-ev0\. e.. ~ W \oc...\A Vle,_ ~ FIRM NAME, NIt~IVM.(lf ^ / EA \ vi f\ \ \'IC- . REPRESENTATIVE'S NAME: tw t l ^ ffi ~ ~Sf11 {u REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: ~ blJ\S~Y\1 't'\)wU 2.-8o~ ~iSttJ ~ B. vA {<;\l i ~\ ~LD D M\AVV\.t Pt.-I M 1-3l C t'NJV\E""~ V v@ ~V\ \. lAl\(\ FIRM NAME: G3T~ IA- (Co/'~~ U5 fe-4 Cu r6R/'o 7hcr~S<7~ ~/~<c--l REPRESENTATIVE'S NAME: J ~ r.Jt:.- Ccr-z..c:::> Jdf C-r~5 REPRESENTATIVE'S SIGNATURE: ~ MAILING ADDRESS: 96/ ?~J7CA dt!- L-t..4h ~/r,~ 5~'Ic- ~()O L-P r4/ &--4bkJ 3..1 /.3y E-MAIL ADDRESS: fJJ t:lr k-t-~? c0 v 315. c.,:)~ FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: CJyIL- woj(ks) lIVe-, REPRESENTATIVE'S NAME: "J'JS6 /J/;1/0; p~ r-- REPRESENTATIVE'S SIGNATURE: ~i1{~' MAILING ADDRESS: 7SS5 htJ /,2 Sr Stt/1e ~:;;F M/JJM/ FL- 33)2-G ) E-MAIL ADDRESS: J aJd/rr52 {! /viJWylSI Corn FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: 8~,.J;) REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: '0 ~. 1a.3t.{S- N~ {p~ ~ to ~ Mill...^,; -' t="l,- 3 3 I G:, I '3QAr.~~ FIRM NAME: ILc- /::;.!J 0/,A/~C:;T? /)J~ +r.J/Z. tr/l CJI /72-Cru/{c?' REPRESENTATIVE'S NAME: AiJC;CL- G REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: S7J..s-'7 GLUb l-4400~1i2/tlbISJJ7~ 4/0(') 1J.14~/J-h- 3312-6 . E-MAIL ADDRESS: Lt,A) ~ e!' (0 -;-e..~ 2s ;) @. -r- t--C. - G ~ 4. c 0 ~ FIRM NAME: ~L\ /Je;f76:::J As'rr?7 I l ~ REPRESENTATIVE'S NAME: ~t5 tt.. ~~/AJ~ REPRESENTATIVE'S SIGNATURE: ~A~ MAILING ADDRESS: t4(lj1 ~rC'tI~~~ c;vfl ~ ~ ft:u1 t.AVlP~ p/.f<J? 1 pt., '5 ?;-?B'l..-( 7 re J E-MAIL ADDRESS: tJkCJ~~aWJe~ tV-~cY. CiPI#1 FIRM NAME: \(e. \ t"" CA () REPRESENTATIVE'S NAME: Sc.h~ . A. CJe kew; ~ P f. REPRESENTATIVE'S SIGNATURE: L ~. MAILING ADDRESS: CSOD Mrill A (\,JreW) \" T.. ~ a v cltr d c.,1 e r L 3 'S ") () q I=- ) E-MAIL ADDRESS: kli~ C\.,.J 5L () FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: 1f2..10 005l6tO COD~Tfrau l({v REPRESENTATIVE'S NAME: A00r(f)1 ro2O REPRESENTATIVE'S SIGNATURE: t ti \ ~ MAILING ADDRESS: 11'\CQ COlL I ~ ~ (1(15 4f ZJt) ~p~ lSQ5) ~tAf(. " '~ ~ttD E-MAIL ADDRESS: ctVldva~ CV fy c-dzs:lft.~ FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: C 1>\--\ -C~\ N?ersJ Tnc. REPRESENTATIVE'S NAME: Jf\SDN L. J ArJ\.ES I REPRESENTATIVE'S SIGNATURE: .~ I CD () MAILING ADDRESS: \qqc SW \~ st-fee.-I- ~\~~.\ I FL S 313 S- f E-MAIL ADDRESS: j j ~fl\~ @cy\)eIjlf\eers. CO"" FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: A I V/ 4. - c t h Q....eJr l REPRESENTATIVE'S NAME: --;;2, ~ ~ v dZ ~ fZ-l/"L cf2~:j. REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: 8 5~ /V,~- 3 3 ~, '3ut-ftLo / VDr~/ ~L 33 /Z-Z /' E-MAIL ADDRESS: y~eJe~@ aAQ/";:, .<2-€.y'1' . C-b~ FIRM NAME: St26 EN6/A.!cEe/,Ves / lA/c. REPRESENTATIVE'S NAME: 1GN~CIO &ee.4c.-r4 REPRESENTA TfVE'S SIGNATURE: C:{)U A~~ / MAILING ADDRESS: ./ Soo / Q'W 74a7; I 0(//713 2G; / 1-1///1-4/ / PL - 35/56 E-MAIL ADDRESS: IgNACIO eSR.S-aO")P' COr-( FIRM NAME: REPRESENTATIVE'S NAME: m !{J1&I2tIJ Ur fif- 6;4 7 AJi3l!/?/ II ~ J/Jt~/P C3. U4~ REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: ?;?1? rto AJ tV -Gr;/!;t 5'1: ;;:7: u,:;?PY/LOA6G; H- :j~?zr:? pM4E:JAAI [)(2 1M wv)" ~~^1 FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: , :5 H- A H , 'bR-o ~ -s- :- A -s Sc> ClJI''l 7e S" REPRESENTATIVE'S NAME: ~~~ MASS IAJc;~ MAILING ADDRESS: REPRESENTATIVE'S SIGNATURE: .., "3 't I 0 AI. AN f"-Pr l.J 'S Ave. 6'7'(1. l=6 W'- pAr.::JO &AC-J.t J 1=='"~ "5 3 o~~ E-MAil ADDRESS: C I>'?A:5$ /"u~ZIZ ~ -$ UA W Ol2csros ~ Cc:::>t'V1 FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: - MAILING ADDRESS: E-MAil ADDRESS: FIRM NAME: ~~VflsfJ~ I ~ 4 ~e.t~ 1 1)Jl/. REPRESENTATIVE'S NAME: \2-AVl- M-\LaA REPRESENTATIVE'S SIGNATURE: ~ 7~ MAILING ADDRESS: C;;\O S;\QT~\J~ ~ 7\J ,- ~ 4-00 ~JJ(u)~ \~ '?<?~~ E-MAil ADDRESS: r--AV-a.-J-\-~ ~~q\~. C-OiA., FIRM NAME: "-'\ . C. t-ta r \0\. (2. H Cl.fr-j !\sSQ...!.',J..,..r I I" e. Coro\\t'lO ~ar~C\-A~ 10 \-.J..ar~.(~V\ 0', re.e~ Z1~O 3,\1\). Dot..(5\Cl~ Yl-oacl 1 ~Ik ::02 H'lom\ Pv 33/33 } E-MAIL ADDRESS: +-C a (' \ s on mcho. f . C-OfV\ ff\cha r . FIRM NAME: L he.n . 3 Assoc'l ~+e-S REPRESENTATIVE'S NAME: L~ ~ jh \$ c-...,y y () !\ REPRESENTATIVE'S SIGNATURE: ~ 8 ~ MAILING ADDRESS: SOD W C'j py-~~ 5 C ve,l2- 'K Kd\ ~'^'\ ~ ~ y\O for-1- Lv-.~cl~y-C{v- \ ~ FL 33:g()9 E-MAIL ADDRESS: I b "'- V V e!\ @~.u\ CrY")\. ("'-~ ~ DC L 8 €- 'S. co fY\ FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTA TfVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: ~\LJ~ ~(L['tJ..lTt.t..1' S REPRESENTATIVE'S NAME: AN Oe.6t,V ~ \ LV'" REPRESENTATIVE'S SIGNATURE: eLl MAILING ADDRESS: (~5 SA.}) ~ 0 i..t tv ?.O ~€ ::Su IT ~ ~~O LO LA L. (~~{J~~ S ~L ~l1 C:. E-MAIL ADDRESS: AAPL61,),J Sll UA (;;) 'IL ,,,^IJL (.oM FIRM NAME: - r C2-~ ~~ Et-j C::.l~E:.E ~ ~ REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: I ~ "'5At.J Lotl..~,..rl.o Alle Sv( 7t! g ~O ( .DflA(. bAJ:x.f. ( ) F L 3>5146 E-MAil ADDRESS: S~J€ LWg(j <; tz..A.6~ e N ~ . (...0 iV\ FIRM NAME: A~P [0 N$UL\I NO TtlfHJ s..fofL\'"f\110tJ E:N~\N'C.8'LS,1 Gcf. REPRESENTATIVE'S NAME: [A-~LOS 1'~. G \ L - M 8Lf\ REPRESENTATIVE'S SIGNATURE: 41~J-k MAILING ADDRESS: \ 030 S NW Yh~ SlilF\:: T SUITt \ \ S '})C)(U1L) FL 011.1 dA- ~~\l~ E-MAIL ADDRESS: C W\Ci' L e APCTE. CoM FIRM NAME: , af FLo,R.i'DA/ IN-'-. N IJTTI'~J6 FtJG)IJ~S REPRESENTATIVE'S NAME: WoJ-lu-A~n-l PrE'. J< ,. c.th4- f?-i> J REPRESENTATIVE'S SIGNATURE: ~vJ~~ MAILING ADDRESS: 20:5'/ /IlW 1/2. TiI Av~ Su i;c IL0 ( -b u t IV} //t IV1 " j--L 33/72- . , E-MAIL ADDRESS: K,'CI< w fJ NCF. c..c. FIRM NAME: ~Rl.~\)QiA ~+trr-rctb?c- (Nff?-1'lAilDNA L fA. REPRESENTA TfVE'S NAME: ~C~N.kNDo MA~If'l ^ REPRESENTATIVE'S SIGNATURE: r) J; , j . 1 I~~ - ?- [, MAILING ADDRESS: Z 460 7UJ 2i A"i . 7\J l Ie '10 .11\M( I tL. -:;~1?7 ~ E-MAIL ADDRESS: (AmA.(i \A~ (e.~lIdtt. -O-Y'~i~e(.+~..~ :>II\^. FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTA TfVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: G-Vl\r< 7 1\!)A-TUjE PA REPRESENTATIVE'S NAME: D A-P+-NE: .I. &{/-}.? Q I; A I A / LeeD ,A P REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: C3 ~ Co l IJ w u, Co ~ -Av t?:r\)Ot SvJ76 ~l6' J~ I Avv\ 1 Ft-- "3~1:;}' ~ / E-MAIL ADDRESS: d~ VYV-; ~ ~ 0("('1 ,^-,\ 0-. ~+e I tOM FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: FIRM NAME: ~ -A~~ (T~c::..--rv~~ -1- ~'Z> \~,.J I 1-'-G REPRESENTATIVE'S NAME: Ml~~ $~\...-- n SL REPRESENTATIVE'S SIGNATURE: ;V JJ MAILING ADDRESS: .3j~ J UI'~:J-cr- t\~L.5 ~~ 4--='7 L... ~f3 tJ~'T ~ / tl--- ? ;::>1 l...p E-MAIL ADDRESS: 1'Vl~ ~t €2-~t -a..r~, La'vV\.. FIRM NAME: PRD;r~1 UIAl!Z:.- REPRESENTATIVE'S NAME: 608. C~,.vE- /5; 13 ~N'Z- REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: ~ 19'1<6 E. S"UArJUs6 &t/t:? ~ErFi- / (;n..r ~0,e:40~ h:5 :5 3 ~ f E-MAIL ADDRESS: (3 C/H 11/13 e ;/7/24:/ ~ C-lf /AI"~. C. oyrz FIRM NAME: REPRESENTATIVE'S NAME: M~,j/~ ~ Id~ ~~,~-~~ REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: '1~ 4:,42 eft? ~~T lV/t~lL P& ~~ / E-MAil ADDRESS: u~ ~wlt; FIRM NAME: REPRESENTATIVE'S NAME: REPRESENTATIVE'S SIGNATURE: MAILING ADDRESS: E-MAIL ADDRESS: Addendum No.2 CITY OF SUNNY ISLES BEACH RFQ NO. 10-04-01 - Professional Engineering Services RFQ NO. 10-04-02 - Professional Architectural Services To All Bidders: Bidders for the above-referenced projects shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise, 3. Q: Is the City asking for a Financial Statement/letter from an accountant for the revenues for the past two years or will just the numbers suffice? A: The numbers will suffice. END OF SECTION Addendum No. 3 CITY OF SUNNY ISLES BEACH RFQ NO. 10-04-01 - Professional Engineering Services RFQ NO. 10-04-02 - Professional Architectural Services To All Bidders: Bidders for the above-referenced projects shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise. 4. Q: On page 4 of RFQ 10-04-01, the City of Sunny Isles Beach requests "A list of all projects (including government projects) completed or in process for the past five years, and a corresponding list of client references with contact names and telephone numbers." - Is this item excluded from the 10-page limit? A: Yes. Q: On page 4 of RFQ 10-04-01, the City of Sunny Isles Beach requests "Proof of authorization to transact business in Florida from the Florida Secretary of State, from the prime as well as supporting firms." - Is this item also excluded from the 10- page limit? A: No. Q: Should we include tax documents to indicate financial state of business? Or what other document should we include to show financial state of business? A: Tax documents are not necessary, just a brief summary will be fine. Q: Do these count as part of the ten-page proposal? A: Yes. Q: Do the sworn statement and affidavit count as part of the ten-page proposal? A: No. END OF SECTION Addendum No.4 CITY OF SUNNY ISLES BEACH RFQ NO. 10-04-01- Professional Engineering Services RFQ NO. 10-04-02 - Professional Architectural Services To All Bidders: Bidders for the above-referenced projects shall take note of the following changes, additions, deletions, clarifications, etc, to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise. 5. Q: There is a discrepancy with the RFQ No. in the Professional Engineering Services proposal for the City of Sunny Isles Beach. On the front, it mentions RFQ No, 10-04-01, however, inside on the page that mentions 1.1 Introduction, 1.2 Time and Date of Submittal, etc., there is another RFQ No. This time, RFQ No. 07-07-01. Which RFQ No. do we use as correct? A The correct number is the/irsl one the 10-04-01 6. Q: Is SF 330 substituting SF 254 and SF 255? Or one can submit either the 330 or 254/255? .-i. Either HiLI}. lhe 330 or (he 254 255 7. Q: Item 2 (list of projects forthe past 5 years) can be covered through forms SF 330 and 254/255: is it going to be considered separately anyways? A Please /ist the relevanl projects in the ten pages (though they are not required 10 be in the sLIme format as lhe 330 25-1 255). 8. Q: According to Addendum 3, proof of authorization to transact business in Florida & the financials will count towards 10-page limitation. Please see Q 2 and Q4 on addendum. We had understood at Pre-Proposal that these pages would not count. Please clarify. A: The authorizalion lhemselves are nor included 111 lhe len pages, and though lhe financial STalements (Tax reTurn. erc.) are not either. a summary of the STaTUS of the firm should be. From paST experience. il did nOT Typically Take the fi~l! allorment of pages/or firms to make their case. Please focus on the conrent END OF SECTION Addendum NO.5 CITY OF SUNNY ISLES BEACH RFQ NO. 10-04-01- Professional Engineering Services RFQ NO. 10-04-02 - Professional Architectural Services To All Bidders: Bidders for the above-referenced projects shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise. 9. Q: In Addendum #4 for RFQ 10-04-01, in response to question #7, the City of Sunny Isles Beach states that the list of projects for the past 5 years is included in the 10- page limit. However, this is contradictory to Addendum #3, in response to question #4, in which the City states that the list of all projects for the past 5 years is excluded from the 10- page limit. Please clarify if the list of projects for the past 5 five years is included or excluded from the 10-page limit. A: A1.\ apology/or rhe confusion. In rhe ren pages, you should include anyrhing rhar you feel is relevant ro your presenration. obviously porentially including experience The forma! presenrarion of experience for !he paslfive years will no! be counted as par! of rhe ten pages. 10. Q. If the contact person in Item 5 is also one of the listed in Item 6 (where all her information will be shown), is necessary to write her information in Item 5? A: You on~y need to slate that the:v are one in the same. 11, Q: We just received Addendum #4 for the RFQ #10-04-02 and there is conflicting responses to critical submittal items. Addendum #4 question 7 indicates that relevant projects are to be included in the ten pages BUT Addendum #3 question #4 indicates that the project list are excluded from the lO page requirement. Also Addendum #4 question #8 indicates the authorizations are not included in the 10 pages but addendum #3 indicates proof of authorization is not excluded. We would appreciate clarification so we can provide an acceptable submittal. A: Confusion reigns, my apologies to all The firsl response was incorrect, lhe proofl' will not be cou11led as a par! oflhe ten pages END OF SECTION I