HomeMy WebLinkAboutCES Consultants, Inc.
... _._~~ -----.-...;-.- -..J-.---,-~--..
U ~ '1
,
~
,
~
';
~ ~...:.,
~
"
v
....,..-.
:... ;-'''';:
"
~
~'t, ,
III
c'
_ ~ ~1nl1filW ~~~~ ~;m
-~~
-~~ RECEIVED
~
,
!ow(:v~:v-:"v,,,,,_""'_v._~...,
, ~
..
~
~
~
~-'
,
~v
r'
~ v"
.-
i ~......
or :--.'~ \. .
~ '~.
$ ~
~ v .....
f.........-... -.................~^ ~....'-..... .-....'.(;..,~A.. :;.,;'if
('"'_....0:::. ~..'W ....-"'-!'I(:"Ir:.-~!W"-~
~ ~
, .
~ v ~
~ ~
~
!
~
~
~
i"
,
~
i"
~
~
!
t
~
~
~
~
~
~
iii ..
?
,.;
~-:.:
..... :
,v
rmm~(tlWSmR3
rnD'fmrimDmEw::all'l::a
~~~~
MAY 2 6J~~~(N\
CITY OF SUNNY 'iS~IACK
OFFICE OF THE CITY-GL!RK
(!)[;]R{]1Iffi
'~I!II-",,""",~-_ ~......-.-.... -.- -Ill:':':; --~
"
"
~~ \. ':,-,-~~,:'-~' .
Y ~: i?0.:'. ........, ~
/ ~
v: ~
.... ~
:
..
"
.., e
8:1
: '".!
CONSULTANTS/INC:
'"
~
"
~
~,
c
14361 Commerce~Way ~
Suite 103 ~
Mia.mrLakes, Florida 33016
" Ph: 305.827.2220
Fx: 305.827.1121
'.,., www.cesconsult.com
;;:-
v~' ""....
'-
.:-: '"
~
v
Table of Contents
Cover Letter
Qualifications
. Company Information
. Business Overview
. Financiallnformation
· Proof of Authorization to transact business in Florida
. Project List
. Proposed Contact Person
. Proposed Personnel
Form 330
Required Forms
City of Sunny Isles Beach - Professional Engineering Services
RFQ No. 10-04-01
cj!s
CONSULTANTS, INC.
Engineering
&
Design Services
Construction
Management
Inspection
Services
Materials Testing
Services
Debris Monitoring
&
Removal
Construction
14361 Commerce Way,
Suite 103
Miami Lakes, Florida
33016
Ph: 305.827.2220
Fx: 305.827.1121
www.cesconsult.com
May 25, 2010
Jane A. Hines, CMC
City Clerk
City Clerk's Office
Sunny Isles Beach Government Center
18070 Collins Avenue
Sunny Isles Beach, FL 33160
RE:
Request for Qualifications - RFQ #10-04-01
Professional Engineering Services
Dear Ms. Hines:
cES Consultants, Inc. (cES) is pleased to submit this Proposal to the City of Sunny Isles Beach
for the above referenced contract. Our unique personnel of professionals has been
assembled with the specific qualifications, experience, and understanding necessary to
successfully perform the various work assignments for the City of Sunny Isles Beach.
One of the outstanding qualities that sets the CES Team apart from our competition, is the
fact that our Principal-in-Charge and the Project Management Team have managed,
designed, and inspected over $5 billion of construction cost in the performance of capital
improvements projects including Roadway, Drainage, Pump Stations, and Water & Sewer
over the past 20 years.
Our proposed staff has a proven record of accomplishment in the implementation of
engineering design services, permitting, contract procurement, contract administration,
construction engineering inspections and all necessary recommended actions on behalf of
the City.
During conceptual design, CES uses proprietary processes and collaborative tools to engage
the project's interdisciplinary team in developing a detailed estimate and gaining alignment
from all functional areas. These processes and tools help identify and mitigate project risks
before detailed design and construction activities begin.
cES is extremely excited about the opportunity to work with the City of Sunny Isles Beach
and we believe that our specific expertise and local experience will provide the right mix for
a truly successful project.
If you should have any questions concerning its contents, please do not hesitate to contact
us.
"
CBS
CONSULTANTS. INC.
Company Information:
Rudy M. Ortiz, P.E., CGC - CEO
CES Consultants, Inc. (HEADQUARTERS)
14361 Commerce Way, Suite 103
Miami Lakes, Florida 33016
Other Office Locations:
Hollywood, FL
Palm Beach Gardens, FL
Orlando, FL
Jacksonville, FL
Washington, D.C.
Business Overview:
Since its beginning, CES Consultants, Inc. has strived to provide unparalleled professional services with
integrity and respect to every client. The company looks forward to the challenges of the future while also
reflecting on the guiding principles that have been its cornerstone since its beginning in 2001. Continued
focus on the needs of both clients and employees sets CES Consultants, Inc. apart from the competition.
CES Consultants, Inc. provides a complete lineup of consulting services for each project, ranging from
conceptual design through final construction. We have developed a style of operation that emphasizes a
team approach and close involvement by our project managers; clients deal with the same project managers
and a handpicked team of in-house experts throughout project involvement.
Our professional staff has over 100 years of combined experience in Civil Engineering, Water & Wastewater
Design, Roadway Design, Program Management, Construction Management, Project Control, Cost Control,
Estimating, Structural Engineering, Construction Engineering, Geotechnical Engineering, Inspection Services,
Permitting Services, QA/QC, Material & Lab Testing Services, Primavera (P3e) Scheduling, and Owner
Representation.
CES is committed to providing exceptional service and we are dedicated to utilizing applied research and
technology to provide functional, efficient, and cost-effective engineering solutions.
We at CES put our engineering and construction management expertise to work, as a partner on our clients'
team, sharing the same goals and objectives. We strive to offer our clients a level of quality that is second to
none in our industry. We will make your next project a reality, and solidify a lasting professional relationship
along the way.
Financial Information:
Financial State of the Business: Good
2009 Annual Revenue: $ 3,164,894,88
2008 Annual Revenue: $ 1,732,178.57
Rudy M. Ortiz, P.E., CGC - CEO
14361 Commerce Way, Suite 103
Miami lakes, Florida 33016
City of Sunny Isles Beach - Professional Engineering Services
RFQ No. 10-04-01
CBS
CONSULTANTS, INC
Proof of Authorization to transact business in Florida:
cES is authorized by the Florida Department of Business and Professional Regulation to offer
Professional Engineering & Construction services throughout the State of Florida.
~tat~,~~~lurial1
Board of ~19fe~~iona,g~ngineers
CES\C;:onsultantstiOc.
.~.; "~1 Ii}.:~.'
i ~ c~~"II .1 l
Is aUlhorized under the provisio~s of sectj.!?I1'~1-M>~~~~da Statutes, 10 offer engineering services
to the public through e Professional Engineer?d~YJlcensed under Chapter 471, Florida Statutes.
expiration: 28-FEB-11 Certificate of Authorization
Audit No: 22820114012
DISPLAY AS REQUIRED BY LAW
CANo:
8811
Certijit;ate of Status
I certlfy from the records ofllus office that CES CONSULTANT'S. INC is a corporation
organized under the I aws of the State of F1onda. filed on October 06, 1997.
The document number ofthi, corporabon i, P97000085972.
1 rurther cerllfy that silld corporation has paid all rees due this office through December 31. 2009,
that its most recent annual reportluniform business report was filed 00 February 12, 2009. and its
status 1 s acb ve
I further cc:rtifythat said corpocabon has not filedArticles ofDissd.ution
I furtb~ certify that tlus is an dectromcally transmitted certificate authorized by section 15 16.
Florida Statutes. md authenticated by thi, cedt, 090212234956.9001434494lmll
0. ven under my hand and the
Great Seal of the State of FI orida
at Tallahassee. the Capital. this the
Twelfth day of February. 2009
.
l~
errrrlarv of s.lalr
City of Sunny Isles Beach - Professional Engineering Services
RFQ No. 10-04-01
clts
CONSULTANTS. INC.
Design and Engineering Services:
Project Name: City of Miami - Melreese Golf Course Club House
Services: Design
Status: Completed
Client Reference: Leo A. Daly - Kathy Rod
Ph: 305.461.9480
Project Name: City of Miramar - Redevelopment Transmission & Distribution Water Main Upgrades-
Phase III
Services: Design, Plans Preparation, Development of Contract Specification, Water Master Plan, Permitting
Status: Completed (Design)
Client Reference: City of Miramar - Ronald Eyma
Ph: 954.538.6806
Project Name: Miami International Airport (MIA) - Runway Pavement Rehabilitation
Services: Design
Status: Completed
Client Reference: Tetra Tech WHS - Mark B. Wolfe, P,E.
Ph: 305.338.3492
Project Name: MDWASD - Water Main Upgrades
Services: Design, Permitting, Bid Document Preparation Assistance, and Construction Services
Status: In Progress
Client Reference: Miami Dade County Water & Sewer Dept. - Reynaldo Abreu
Ph:786.552-8161
Project Name: MDWASD - Pipeline Design 8-inch DIP Water Main
Services: Design, Route Analysis, Hydraulic Modeling, Permitting, Construction Phase Services
Status: Completed
Client Reference: MDWASD - Rafael J. Ballesteros, P.E.
Ph: 305.753.2605
Project Name: MDWASD - CDWWTP Water Reclamation Facility
Services: Design of Paving, Grading, and Drainage
Status: In Progress
Client Reference: MWH Americas, Inc. - Jamie Docherty, P,E.
Ph: 954.846.0401
Project Name: MDPWD - SW 27th Avenue Roadway Reconstruction
Services: Design and Engineering Analysis
Status: In Progress
Client Reference: Miami Dade County Public Works Department - Hector Aleman, P.E.
Ph: 305.375.4866
Project Name: South Florida Water Management District - Everglades Restoration
Services: Design and Miscellaneous Engineering Services
Status: Completed
Client Reference: ES Consultants, Inc - Eduardo F. Smith, P.E.
Ph:305.412,8185
RFQ No. 10-04-01
cjfs
CONSULTANTS, INC
Construction Management, Construction Inspections, and Materials
Testing Services:
Project Name: City of Ft. Lauderdale - Waterworks 2011 Water, Sewer Stormwater & Force Main
Services: Construction Oversight
Status: In Progress
Client Reference: CMTS Florida, LLC - Eva Gibson
Ph: 954.561.9197
Project Name: City of Opa-Locka Canal Improvements
Services: Construction Engineering and Construction Inspections
Status: Completed
Client Reference: PBS&J - Christopher A. Niforatos, P.E.
Ph: 813.876.6800
Project Name: City of Homestead - Flagship Cinema
Services: Design, Construction Management, and Construction Inspections
Status: Completed
Client Reference: PBS&J - Roberto S. Ortiz, P.E.
Ph: 305.704.4429
Project Name: MIA - Mover APM System
Services: Construction Materials Testing, and Construction Inspections
Status: In Progress
Client Reference: Miami Dade Aviation Department - Franklin Stirrup III, P.E.
Ph: 305.876,7922
Project Name: MIA - North Terminal Development
Services: QA/QC and Construction Inspections
Status: In Progress
Client Reference: Parson-Odebrecht Joint Venture - Assed Mowzoon
Ph: 305.341.8800
Project Name: MIA - MIC Earlington Heights Connector Metrorail Extension
Services: Construction Inspections and Materials Testing
Status: In Progress
Client Reference: Odebrecht Tower Community Joint Venture - AI Barrero, P.E,
Ph: 305.341.8800
Project Name: Ft. Lauderdale/Hollywood Airport - Utility Atlas Update
Services: Construction Engineering
Status: In Progress
Client Reference: RS&H - Michael Moore
Ph: 684.236.7374
RFQ No. 10-04-01
clis
CONSULTANTS. INC.
Project Name: Marlins Ballpark
Services: Owner's Representative, On-Site field observations to oversee construction operations.
Status: In Progress
Client Reference: URS Corporation - Stephen Baumal
Ph: 305.884.8900
Project Name: FEMA - Dorm Stormwater Reduction Program
Services: Construction Management and Construction Inspections
Status: Completed
Client Contact: PBS&J - David J. Carter, P.E.
Ph: 305.514.3272
Project Name: MDPWD - Master-Consulting Contract
Services: Project Management, Construction Engineering, and Construction Inspections
Status: Completed
Client Reference: Miami Dade County Public Works Dept. - Octavio Marin, P.E,
Ph: 305.375.4664
Project Name: Miami Dade County Federal Courthouse
Services: Construction Management, Construction Inspections, and Construction Materials Testing
Status: Completed
Client Reference: Terry Fuquea
Ph: 404.331.1305
Project Name: Miami Dade County Performing Arts Center
Services: Construction Management Services
Status: Completed
Client Reference: Adrienne Arsht Center - Administrative Offices
Ph: 786.468.2000
Project Name: South Florida Water Management District Compartment C Buildout G-S08 Pump
Services: Construction Management, Construction Inspections, and Construction Materials Testing
Status: In Progress
Client Reference: TY Un International/HJ Ross - Jose Nessi
Ph: 305.567.1888
Project Name: US Air Force / Homestead Air Force Base - Miscellaneous Projects
Services: Construction Management, Construction Inspections, QA/QC and Construction Materials Testing
Status: Completed
Client Reference: Homestead Air Force Base - Henry Burgains
Ph: 305.224.7406
Project Name: US Army Corps of Engineers - Seminole Big Cypress Reservation Water Conservation Plan
Services: Construction Materials Testing
Status: Completed
Client Reference: US Army Corp of Engineers South Florida Area Office - Howard Yeager
Ph: 561.472.3500
City of Sunny Isles Beach - Professional Engineering Services
RFQ No. 10-04-01
cils
CONSULTANTS, INC
Project Name: US Army Corps of Engineers - Herbert Hoover Dike Rehabilitation
Services: Construction Materials Testing
Status: In Progress
Client Reference: US Army Corp of Engineers South Florida Area Office - Saxby Anderson, P.E.
Ph: 561.472.3500
Project Name: US Army Corps of Engineers - USACE Istokpoga
Services: Construction Materials Testing
Status: Completed
Client Reference: US Army Corp of Engineers South Florida Area Office - Erin Duffy
Ph: 561.472.3500
Project Name: US Army Corps of Engineers - South Florida Water Management District
Services: Construction Management, QA/QC, Surveying, Culvert Installation & Testing, Heavy Equipment
Operation and Contract Administration
Status: Completed
Client Reference: Walter (Doug) Wood, P.E,
Ph: 561.340.1520
Project Name: Department of Veterans Affairs - Various Facilities throughout Florida
Services: Construction Management
Status: Ongoing
Client Reference: Darnell Cox
Ph: 786.251.3047
Structural Services:
Project Name: South Florida Water Management District S-332D Hurricane Hardening
Services: Structural Review
Status: In Progress
Client Reference: Jordan Jones & Goulding - David Scott
Ph: 561.799-3855
Project Name: South Florida Water Management District Pump Station Hardening Project
Services: Structural Design
Status: Completed
Client Reference: TY Lin / HJ Ross, Inc - Gino A. Valderama, P.E.
Ph: 305.567.1888
Project Name: Midway Pump Station
Services: Structural Design
Status: In Progress
Client Reference: C3TS, Inc. - Daniel Grandal, P.E.
Ph: 305.445.2900
City of Sunny Isles Beach - Professional Engineering Services
. . I .. I
ells
CONSULTANTS. INC
Hurricane Recovery and Debris Monitoring Services:
Project Name: Miami Dade County - Hurricane Katrina Debris Monitoring
Services: Debris Monitoring
Status; Completed
Client Contact: Miami Dade County Public Works Dept. - Octavio Marin, P.E.
Ph: 305.375.2116
Project Name: City of Jacksonville - Tree Damage Assessment & Monitoring Services
Services: Debris Monitoring
Status: Completed
Client Contact: City of Jacksonville - Alice Jones
Ph: 904.591.9625
Project Name: City of Jacksonville - Hurricane Planning & Preparation Workshop
Services: Debris Monitoring Workshop
Status: Completed
Client Contact: City of Jacksonville - Alice Jones
Ph: 904.591.9625
City of Sunny Isles Beach - Professional Engineering Services
RFQ No. 10-04-01
ciis
CONSULTANTS, INC
CES is a team of professionals with a proven track record that not only has the ability to successfully
transform plans into reality, but also to exceed our client's expectations. Our team is comprised of members
who have worked together on numerous successful projects. In the public arena, the firm provides ongoing
engineering design and construction administration services for many municipalities, communities and
agencies which include: Miami Dade County, Miami Dade County Water & Sewer Dept., Miami Dade County
Public Works Dept., City of Miramar, City of Homestead, City of Opa-Locka, City of Ft. Lauderdale, South
Florida Water Management District, Broward County Housing Authority and City of Jacksonville, just to name
a few.
Recognizing that the individuals assigned to this contract will represent the reputation and public image of
the City of Sunny Isles, we have taken great care to identify staff with not only a high degree of technical
expertise, but also with excellent communications skills.
The CES team has the resources necessary to successfully perform the scope of services included in this
solicitation. The professional staff proposed to work on this contract by the CES team is currently committed
to projects at various percentages of participation. It is our expectation to have most team members
available 100% to meet the needs of the City for this contract.
Proposed Contact Person:
Luis A. Olivares, P.E.
Sr. Vice President
Ph: 305.827.2220
Fx: 305.827.1121
e-mail: lolivares@cesconsult.com
Mr. Olivares is the Director of Engineering of CES and personally manages many of the firm's engineering
assignments. He has more than 25 years of experience as a Civil Engineer, and has been working on major
assignments for the Florida Department of Transportation, Miami-Dade Expressway Authority, Miami-Dade
County Public Works; Water and Sewer; Aviation and Seaport Departments, Miami-Dade and Broward
County Public Schools, United State Postal Service, City of Miami and other local cities and municipalities,
managing assignments involving major transportation projects, utilities relocation, roadway reconstruction
and right-of-way improvement, airport apron pavement design and reconstruction. In supporting major
national architecture firms Mr. Olivares has also worked on major site development projects including hotels,
schools, hospitals, and shopping centers.
Proposed Personnel:
Rudy M. Ortiz, P.E., CGC - CEO / Principal in Charge
Mr. Ortiz has over 25 years of design and management experience in a variety of civil engineering areas,
specializing in the design and construction management of neighborhood improvement projects, and
water/wastewater facilities. Mr. Ortiz's experience also includes Program Management of fast-track and
complex water and wastewater projects, including Consent Decree programs for Miami-Dade County
and Puerto Rico. With the City of New York, Mr. Ortiz functioned as Construction Manager, Resident Engineer
and Field Engineer, for a variety of multi-million dollar roadway reconstruction and neighborhood
improvement projects,
RFQ No. 10-04-01
clts
CONSUlTANTS, INC.
Werner A. Reinefeld, P.E. - Design Engineer
Mr. Reinefeld has over 20 years of experience in the fields of civil and infrastructure engineering, project
management, design, construction, computer-aided design and land development. His experience includes
earthworks, road systems, hydrological and hydraulic studies and modeling, water and wastewater facilities,
sewerage system, storm water and drainage, oil contaminated water, site audits permitting feasibility
studies, proposal preparation and land development projects. Mr. Reinefeld's skills include projects in
regards to planning, coordinating technical issues, cost control, quality assurance and quality control,
suppliers, local authorities, marketing, and sales.
Mr. Reinefeld has experience in a wide range of pipeline, roadway, land development design, inspection,
water and wastewater treatment, master planning, and storm water planning for both small and large
projects.. He has prepared construction drawings and specifications for water pipelines, force mains, gravity
sewers, pump stations, and water and wastewater treatment facilities. His assignments have required a great
deal of coordination and knowledge in the detailed permitting requirements of city, county, state, and
federal agencies. In the past years, Mr. Reinefeld has been involved extensively in environmental permitting
at all levels of government agencies.
Gustavo A. Eckardt, P.E. - Project Engineer
Mr. Eckardt has over 8 years of engineering experience in the field of civil and environmental engineering
specializing in the design and preparation of projects including stormwater drainage, roadway, and transit rail
station projects. His knowledge and professional background qualifies him as a Project Engineer with
experience not only in design but also in contract documents and administration, payment requisitions,
change negotiations, sub-consultant's invoice review, general management and interface with private and
public sectors, as well as liaison between owner and contractor.
Stephen Manis, P.E., LEED AP@ - Sr. Project Manager
Mr. Manis has over 30 years of experience in the Project Management & Engineering field. He has
managed/supervised numerous projects related to civil, environmental, water, and wastewater treatment.
Mr. Manis has proven success in the oversight and direct delivery of the design, permitting, cost preparation,
and reporting in several different capacities of his project management positions.
Mr. Manis has managed and supervised a group of engineers, engineering interns, and technical staff that
designed and permitted site development projects, including residential, commercial and industrial land
development; local government site development projects; civil construction projects for the military; and
site development for institutions facilities. He was responsible for client development, management,
performed storm-water management analysis, and studies. He handled the master planning and hydraulic
modeling for water distribution and wastewater collection systems. Mr. Manis obtained the site and
environmental permitting through local governments, State Water Management Districts, U,S. Army Corps of
Engineers, Florida Department of Environmental Protection, and the Florida Department of Health.
Jose A. Compres, P.E. - Structural Engineer
Mr. Com pres has over 13 years of experience in civil engineering including overall structural, project
construction design and engineering processes with demonstrated experience in Engineering Design, Project
Development, General Contracting, and Construction Management. Mr. Com pres has been involved in all
aspects of construction projects from conceptual design to project closeout. His responsibilities included pre-
qualifying contractors, bid and award, monitoring the quality of work performed during construction,
processing and responding to RFl's, review and address change orders, track and monitor the quantity of
materials, track and maintain schedules, and coordinate with subcontractors and stakeholders. Being a
professional engineer, Mr. Com pres has also worked closely to develop biddable plans for both horizontal
and vertical projects.
City of Sunny Isles Beach - Professional Engineering Services
RFQ No. 10-04-01
G}Js
CONSULTANTS, INC
Jose A. Caraballo - Project Manager
Mr. Caraballo has over 7 years of experience in a variety of civil and environmental engineering project
delivery including, air permitting, paving and drainage project, Class IV Freshwater Wetland Permitting, and
South Florida Water Management District Environmental Resources Permitting. He has been able to take
projects from the conception stage through a successful completion.
Aleem Uddin - Testing Laboratory Manager / Quality Engineer
Mr. Uddin has over 9 years of engineering and materials testing experience working with federal, state and
local governments, where he coordinated testing and implementation of international standards
specifications such as outlined in ASTM, ACI, FAA, FDOT, CTQP standards to ensure regulatory compliance.
Mr. Uddin is certified and experienced in soil, concrete and asphalt inspection as per FOOT CTQP standards.
He has successfully completed projects in the areas of planning, permitting, construction, pavement,
concrete, operations and maintenance, and an array of other industrial engineering fields.
Ashraf Iqbal, E.I. - Assistant Laboratory Manager
Mr. Iqbal has over 5 years of Civil Engineering Experience. He has performed work on Miami Dade county
projects, Broward County projects, and worked with research at Florida International University. Mr. Iqbal
has coursework in hazardous waste materials, wastewater treatment, highway and bridge design, as well as
Air Pollution Control.
Vanise J. Ford - Construction Inspector
Ms. Ford has over 12 years of experience in the field of construction and construction inspections. She has
participated in the construction and construction management of underground utilities including water main
installation, sanitary sewer force main installation, sanitary sewer gravity main installation, sanitary sewer lift
station construction, storm sewer installation, and storm sewer pump station construction. Ms. Ford is also
well equipped in producing accurate documentation in the aspect of Quality Control and Quality Assurance
Construction Documentation.
Raul Ontano - Project Manager/Quality Control Representative
Mr. Ontano has over 22 years of experience in the construction industry. Mr. Ontano possesses a Masters in
Architecture with relevant coursework in Building Codes, Educational Facilities, Truss Calculation and Design,
Construction Management, and General Contractor. Mr. Ontano also has working knowledge of both Private
and Government facilities.
Masoud Ghasemloian - Construction Manager/Lead Building Inspector
Mr. Ghasemloian has over 12 years of combined experience in the construction industry and has conducted
threshold inspections, structural, fire stopping, and fireproofing inspections for the South Terminal Expansion
Program at Miami International Airport to ensure and verify that all contractors comply with specifications
and permitted plans. He also conducted environmental site inspections for the South Terminal and
Concourse J projects.
City of Sunny Isles Beach - Professional Engineering Services
RFQ No. 10-04-01
......"...":.. ~- :~ ;~, -"", 'M"~~;'"'>;;'~"1:'-:,.~~ .r, '. , '~~;.,:, y "':v-:.__~:~< '!'O
'~I!.~~.'.:~~ II .
',~;'~~:~~~[eil~I~~:J~~~t
c:..<,' _'.. 0, L.~;i..:i,- _': cO_ , ,"'--" '...........,--J." _._ .;;."~::L;.;(,;,,~~,';'I)~~.--.;;;.-J~_:!'-'"
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (City and State)
Professional Engineering Services
2, PUBLIC NOTICE DATE
4/26/2010
13. SOLICITATION OR PROJECT NUMBER
RFQ No.1 0-04-01
B. ARCHITECT-ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Luis A. Olivares, P.E. - Sr. Vice President
5. NAME OF FIRM
CES Consultants, Inc.
6. TELEPHONE NUMBER
305.827.2220
17. FAX NUMBER
305.827.1121
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)
18. E-MAIL ADDRESS
cesi nfo@cesconsult.com
(Check)
a: '0:: 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
w w Zo
::E >z 0>-
0: ,>- Uu
-'0:: alo:(
"- 0:( =>0::
"- "'>-
a. Structural Engineering
14361 Commerce Way Civil Engineering
X Suite 103 Construction Management
CES Consultants, Inc. Miami Lakes, FL 33016 Construction Inspections
Construction Testing
0 CHECK IF BRANCH OFFICE Debris Monitoring
b.
0 CHECK IF BRANCH OFFICE
C.
0 CHECK IF BRANCH OFFICE
d.
0 CHECK IF BRANCH OFFICE
e.
0 CHECK IF BRANCH OFFICE
f.
0 CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM
D (Attached)
STANDARD FORM 330 (6/2004) PAGE 6
.....
. ..
Rudy M. Ortiz, P.E., CEO
-. - . --
13. ROLE IN THIS CONTRACT
Principal-in-Charge
. - .
15. FIRM NAME AND LOCATION (City and State)
CES Consultants, Inc. - Miami, FL (Headquarters)
16. EDUCATION (DEGREE AND SPECIALlZA nON)
B.S., (Civil Engineering) 1983; University of New York
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Engineer
Florida No. 52515
New York No. 071607
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Mr. Ortiz has over 25 years of design and management experience in a variety of civil engineering areas,
specializing in the design and construction management of neighborhood improvement projects, and
water/wastewater facilities. Mr. Ortiz's experience also includes Program Management of fast-track and
complex water and wastewater projects, including Consent Decree programs for Miami-Dade County and
Puerto Rico. With the City of New York, Mr. Ortiz functioned as Construction Manager, Resident Engineer and
Field Engineer, for a variety of multi-million dollar roadway reconstruction and neighborhood improvement
projects.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Fort Lauderdale Water Works 2011Water, Sewer. Stormwater and PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Force Main, Fort Lauderdale FL Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( X J Check if project performed with current firm
a. Mr. Ortiz served as project principal for the firm responsible for providing construction administration and oversight for the
installation of various infrastructure improvements. CES staff are placed on a full time basis to observe several work crews in
various stages of completion. We then produce daily reports that the client can use towards payment requisition verification,
schedule compliance, work site safety, and verification of construction adhering to the design specifications.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
East Miramar Redevelopment Transmission & Distribution Water PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Main Improvements Phase III, Miramar, FL 2009
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ( X J Check if project performed with current firm
Mr. Ortiz provided services in monitoring the design of approximately 72,000 L.F. of 6-inch water main and services for the
City of Miramar, including a directionally drilled 8-inch Ductile Iron Pipe section of 120 L.F. The functionality of the design is for
improved fire protection throuqhout the neiqhborhoods, which currently has 2-inch and 4-inch water mains,
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
FEMA-DORM Flood Reduction Program, Miami-Dade County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
2006
c. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ( X] Check if project performed with current firm
Mr. Ortiz served as project principal for the firm, responsible for design and construction oversight of roadway improvements
as part of the County's flood reduction program. Mr. Ortiz responsibilities included planning, design review and cost estimate
preparation for the design of French drainage, roadway resurfacing and reconstruction. Mr. Ortiz also provided quality
assurance services for the firm durinq implementation of similar proiects desiqned by others, but supervised bv CES.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SW 2th Ave from US-1 to Bayshore Drive, Miami Dade County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( X) Check if project performed with current firm
d. Mr. Ortiz as Project Principal is currently responsible for the engineering analysis and design services for a closed storm water
drainage system along SW 27'h Avenue between South Dixie Highway and South Bayshore Drive. The project consists of
widening this stretch of roadway measuring approximately 0.75 miles. Some of the design issues encountered are the
elevation changes throughout the stretch of roadway and the amount of utilities located throughout this older corridor. The
team has worked diligently to provide a technically sound and cost effective design that incorporates all of the client's
requirements and needs.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami-Dade County Waste Water Master Plan, Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
County Water & Sewer Department, FL 2007
e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm
Mr. Ortiz as Project Principal is currently responsible for the development of Remedial Action Plans for approximately 350
Pump Stations. The Remedial Action Plans will help upgrade each individual pump station and make them compliant with the
1 O-Hr operatinq criteria.
19. RELEVANT PROJECTS
STANDARD FORM 330 (ty.Z004) PAGE 1
12. NAME
Luis A. Olivares, P.E.
.
13. ROLE IN THIS CONTRACT
Director of Engineering
28
<1
15. FIRM NAME AND LOCATION (City and State)
CES Consultants, Inc., Miami Lakes, Florida (Headquarters)
16. EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
B.S., Civil Engineering Professional Engineer
Tulane University, 1982 Florida - No. 49708
Texas - No. 64180
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Mr. Olivares is the Director of Engineering of CES and personally manages many of the firm's engineering
assignments. He has over 25 years of experience as a Civil Engineer, and has been working on major
assignments for the Florida Department of Transportation, Miami-Dade Expressway Authority, Miami-Dade
County Public Works; Water and Sewer; Aviation and Seaport Departments, Miami-Dade and Broward
County Public Schools, United State Postal Service, City of Miami and other local cities and municipalities,
managing assignments involving major transportation projects, utilities relocation, roadway reconstruction
and right-of-way improvement.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
City of Miami Miscellaneous Civil Engineering Services, Miami, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
a. Florida
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
Served as Project Manager for a continuing miscellaneous engineering services contract
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SW 2nd Avenue Bascule Bridge, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
Project Engineer responsible for the supervision of the drainage design of the bridge and approaches pump system installation
on both ends of the bridge. The project was a new four-lane bridge with a total span of 300 ft. consisting of two 3,OOO-ton
bascule leaves. It is the third longest drawbridae in the U.S. and the fourth longest in the world.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Coconut Grove Drainage Design Improvements, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
C. Project Manager in charge of the evaluation of both the design and the physical inspection of the existing storm drainage
collection system within the 28 acres in the City of Miami. The study evaluated the failed drainage system and confirmed
eyewitness reports of flooding and provided cost effective repairs and upgrade to the existing system. We prepared the first
phase improvements to the drainage by designing an exfiltration trench system that will capture and maintain a two-year storm
event and allow the City to place an emerqencv Duma station and draw down future flood events.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Fairhaven I Bayshore Drive Neighborhood Improvements, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Coconut Grove, Florida
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.j AND SPECIFIC ROLE [ ) Check if projecl performed wilh current firm
Project Manager responsible for the roadway reconstruction, drainage improvements, new in-fill landscape, irrigation, and
roadway lighting. Among the special challenges of the project were the utility coordination and preservation of the existing
landscaoe as well as minimizing the impacts to the existina decorative driveways throuQh coordination with the communitv.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
County Wide Drainage Improvement Construction Inspection PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Services, Miami Dade County, (Miami Dade County Public Works
e. Department)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
Construction Project Manager for the countywide GOB construction inspection project. Duties include supervising field
inspectors for the site inspection; corresponding and coordination with the county project managers on various drainage
construction sites for iob progress, inspection schedule and inspector availability
19. RELEVANT PROJECTS
STANDARD FORM 330 (&'2004) PAGE 1
~E" RESUM~S~OF KEY"r~,R~ONNEL ~~~~,p.~E~>FO~JH~S C-~
_~';h~~~rbt.: .Jti$~~(Complete one Section E for each'key person.') . ,
12. NAME
Werner J. Reinefeld, P.E.
13, ROLE IN THIS CONTRACT
Design Engineer
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
26 <1
15. FIRM NAME AND LOCATION (City and State)
CES Consultants, Inc. - Miami, FL (Headquarters)
16. EDUCATION (DEGREE AND SPECIALlZA nON)
BS, Civil Engineering
Central University of Venezuela, 1983
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Engineer
Florida No. 63042
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Replacement of the 54-inch Force Main from the CDWWTP to PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami Beach (Government Cut) 2010 N/A
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I ] Check if project performed with current firm
Mr. Reinefeld was responsible in developing and coordinating with MDWASD the Master Specifications Volume for the
Design-Build Package. Duties included developing of separated Design Build Packages for the 20-inch WM relocation
between Port of Miami and Fisher Island and 54-inch FM relocation between Miami Beach and Virginia Key.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Needs Assessment Program-Miami-Dade Water and Sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Department, Miami, FL 2005 2006
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ J Check if project performed with current firm
Reinefeld served as the project manager for various water main and force main improvement projects including: Perrine-Cutler
b. Ridge Basis of Design Report (BOOR) involved 9,000 LF of water mains, 1,600 LF of force main, and 6,500 LF of sanitary
sewer lines. It also included the site selection, dimensioning and sizing of a Regional Wastewater Pump Station. Alternative
review and selection was based on lower cost and system expansion as well as construction phases along US-1.
New force main from Pump Station No. 373 to a force main running along NW 196th Lane which included route selection,
pipeline design, lift station up~rades and construction support services. 6,500 LF of 8-inch water main along the area bounded
by SW 82nd Avenue to SW 85 h Avenue and SW 41 5t Street to SW 46th Street
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Design of 16-inch Distribution Pipeline for Reclaimed Water PROFESSIONAL SERVICES T CONSTRUCTION (If applicable)
Miami-Dade Water and Sewer Department, Miami, FL 2009 In Progress
(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE [ J Check if project performed with current firm
Mr. Reinefeld was part of the design team for a 3.4 miles of 16-inch reclaimed water pipeline. Miami-Dade Water and
c. Sewer Department (MDWASD), Miami, Florida MDWASD required a new reclaimed water distribution pipeline from the
Central District Wastewater Treatment Plant Water Reclamation Facility (CDWWTP-WRF), to Crandon Park Golf Course on
Key Biscayne and then from the Crandon Park Golf Course to the Village of Key Biscayne. Scopes of services included
investigate existing and proposed conditions along the transmission pipeline corridor for the purpose of establishing a
conceptual design for the new reclaimed water pipeline. The new transmission pipeline also included existing and potential
connection points alonQ the route.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Design of a 72-inch Raw Water Main-Miami-Dade Water and PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable)
Sewer Department, Miami, FL 2009 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ J Check if project performed with current firm
d. Mr. Reinefeld served as a Senior Project Engineer for the design of a 72-inch Raw Water Main intended to transport raw
water from the WASD Northwest Wellfield to the Hialeah/Preston Treatment Plant. The proposed RWM served as a redundant
pipeline to the existing 96-RWM running along NW 74th Street. Scope of Services for this project The scope of work included
preparation of BODR-30%, 60%, and 90% submittal, construction documents, technical specifications, permitting and
construction support.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Design of a 60-inch Force Main-Miami-Dade Water and Sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Department, Miami, FL 2009 NI A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I ] Check if project performed with current firm
e. Mr. Reinefeld was Project Manager for a 3-mile 60-inch Force Main Project. The scope of work included preparation of the
alternative routes available for the new 60-inch force main. Construction materials and methods, construction cost, ,
coordination with future planned projects, and coordination with Federal, State and County regulatory agencies, local
governments, property owners and stakeholders having interest or potential interest in this project, As part of the design
phase, Mr. Reinefeld coordinated the preparation of BODR-30%, 60%, and 90% submittal, construction documents, technical
specifications, permitting and construction support.
STANDARD FORM 330 (fY2004) PAGE 1
.'::;:' - TRAC~~~
",",' , ':;'~iJi,f~~fi,~1%~(Complet~ne SectionlE for each key person.) " ..A
12. NAME
Gustavo A. Eckardt. P.E.
13. ROLE IN THIS CONTRACT
Project Engineer
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
8 2
15. FIRM NAME AND LOCATION (Ci/rand State)
CES Consultants, Inc. - Miami, FL (Headquarters)
16. EDUCATION (DEGREE AND SPECIALlZA nON)
B.S. Civil Engineering, University of North Carolina
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Engineer
Florida No.67553
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Chi Epsilon Civil Engineering Honor Society
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SW 27'h Ave from US-1 to Bayshore Drive, Miami Dade County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I X] Check if project performed with current firm
a. Mr. Eckardt was a project Engineer and provided engineering services in this roadway improvement project. The project
consists of widening this stretch of roadway measuring approximately 0.75 miles with significant elevation changes throughout
this section of roadway and with numerous utilities located throughout this old corridor. The team has worked diligently to
provide a technicallv sound and cost effective desiQn incorporatinQ all of the client's needs
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
East Miramar Redevelopment Transmission & Distribution Water PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Main Improvements Phase III, Miramar, FL 2009
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm
b. Mr. Eckardt as Project Engineer provides engineering design services for the upgrade of approximately 72,000 L.F. of water
mains in the City of Miramar. The project consists of upgrading existing undersized 2-inch and 4-inch residential water mains
to 6-inch PVC water mains. This effort will improve pressure and provide fire protection within the area. ML Eckardt is working
closely with the client to produce the most technically sound and cost effective design that incorporates all of the client's
requirements and needs. Project also includes the preparation of bid documents, specifications, and permittinQ.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami Dade County Water & Sewer Dept. Pipeline Design 8-inch PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
DIP Water Main Project E01-WASD-05B 2006
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm
C. Mr. Eckardt was responsible for the design of over 2,000LF of 8-inch Ductile Iron Pipe (DIP) water distribution pipeline in the
Northeast area of Unincorporated Miami-Dade County. Mr. Eckardt was in charge of this project from conception to final
design submittal. Responsibilities included utility coordination, future project coordination, bid document and specifications
preparation, project scheduling updates, preparation of engineering cost estimates, design and plans preparation, and
coordination with all the stakeholders.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
12-lnch Force Main Replacement Along Caribbean Boulevard, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami-Dade Water and Sewer Department (M-DWASD), Miami, FL 2009
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
d. Mr. Eckardt was responsible for the design, plans preparation and required coordination of this project which included the
construction of approximately 3,500 LF OF 12-inch Ductile Iron Pipe (DIP) force main to replace the existing 1Q-inch and 12-
inch asbestos cement pipe for M-DWASD. Mr. Eckardt was also involved in the design of about 100LF of sub-aqueous canal
crossing under C-1 N Canal using Ball and Socket DIP, coordination and design for connections to the existing Pump Stations
and force mains, design of ADA compliant sidewalks and ramps, and the preparation of Bid Documents and Specifications,
includinQ the conception of a new specification of Ball and Socket DIP pipe for subaqueous crossinQs.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
NW 102 Roadway Improvements, Town of Medley, Medley, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
2007
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
e. Mr. Eckardt provided construction administration services for this project which included milling, paving and a new storm water
drainage system along NW 102 Road between 116 Way and the Tarmac Company entrance located in Medley, Florida, This
roadway required the installation of drainage structures and construction of exfiltration trenches as the proposed method of
meeting the drainage requirement for the improvements. Additional settling boxes were included in the drainage design to
collect the large amount of silt and debris generated in this commercial roadway.
STANDARD FORM 330 (tY2004) PAGE 1
.. -
13. ROLE IN THIS CONTRACT
Structural Engineer
16
3
15. FIRM NAME AND LOCATION (City and State)
CES Consultants, Inc. - Miami, FL (Headquarters)
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., (Civil Engineering) 1994; Universidad Catolica
Madre y Maestra
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Engineer
Florida No. 65557
18. OTHER PROFESSIONAL QUALIFICATIONS (Publicalions, Organizations, Training, Awards, etc.)
Mr. Compres has 16 years of experience in engineering including overall structural, project construction
design and engineering processes with demonstrated experience in engineering design, project
development, and construction management.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Structural Designer, Midway Pump Station, City of Miami, Miami, PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
Florida Ongoing
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check il project performed with current firm
Mr. Compress performed all the structural calculations, design and drafting required for the construction of this ~ump station.
This pump station will serve to protect a 43 acre basin bounded by NW Bih Avenuye, SR-B26 and SR-B36 and i Street in the
City of Miami from flooding.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Structural & Civil Plans Review Committee, SFWMD, West Palm PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
Beach, Florida Ongoing
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I X] Check il project performed with current firm
As a member of the consultants' team, his responsibilities include structural and civil review of the project plans, specs and
engineering design report for all the projects to be developed by SFWMD. Among them, the Storm Treatment Areas
Compartment C 8uild-Out and the 85098 Compartment 8 build out.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Structural Review, SFWMD 5-3320 Hurricane Hardening, Miami, PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
Florida 2011
c.
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I X] Check il project performed with current firm
Mr. Compress provided the Structural review for this project involving the hardening and upgrading of the S-332D Pump
Station located near Homestead, Florida in Miami-Dade County.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Structural Designer, Warehouse for Florida Properties II, Miami, PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
Florida N/A
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ } Check il project performed with current firm
This project consisted of the construction of a new 20-mile segment of road connecting Santiago to San Jose de las Matas, in
the Dominican Republic. The major components of this project included Earthwork, installation of drainage structures, base
and sub-base construction, pavinq and siqnalization.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Structural Designer and Threshold Inspection, Dominican PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
Republic N/A
e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check il project performed with current firm
As a structural designer, Mr. Com pres was responsible for the design and threshold inspection for many private
and publiC projects
STANDARD FORM 330 (tV2004) PAGE 1
8
6
15. FIRM NAME AND LOCATION (City and State)
CES Consultants, Inc. (Headquarters)
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Environmental Engineering
Louisiana State University 2002
Baton Rouge, LA
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Mr. Caraballo has over 8 years of experience in a variety of civil and environmental engineering project
delivery including, air permitting, paving and drainage project, Class IV Freshwater Wetland Permitting, and
South Florida Water Management District Environmental Resources Permitting. He has been able to take
projects from the conception stage through a successful completion.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
East Miramar Redevelopment Transmission & Distribution Water PROFESSIONAL SERVICES CONSTRUCTION (II applicable)
Main Improvements, Phase III, Miramar, FL 2009
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (X] Check il project performed with current firm
a. Mr. Caraballo as Project Manager provided engineering analysis and design services for the upgrade of approximately 72,000
L.F. of water main. The project consists of upgrading existing 2-inch and 4-inch residential water main to a 6-inch water main.
This effort will improve pressure and provide fire protection within the area. Mr. Caraballo is worked closely with the client to
produce the most technically sound and cost effective design that incorporates all of the client's requirements and needs. Mr.
Caraballo is also in char e of all ermittin efforts for this ro'ect.
(1) TITLE AND LOCATION (City and State)
Clubhouse I Restaurant for Melreese Golf Course, Miami, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2009
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I X] Check il project performed with current firm
Mr. Caraballo as Project Manager is provided civil engineering services for the design of a new restaurant / clubhouse at the
Melreese Golf Course. One of the design issues encountered is the existing ash contamination at the site. Mr. Caraballo was
also res onsible for the water and sewer ermittin as well as the draina e and site ermittin .
(1) TITLE AND LOCATION (City and State)
SW 2ih Ave from US-1 to Bayshore Drive, Miami Dade County, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (II applicable)
On oin
c.
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (X] Check il project performed with current firm
Mr. Caraballo as Pro~ect Manager is providing engineering analysis and design services for a closed storm water drainage
system along SW 2i Avenue between South Dixie Highway and South Bayshore Drive. The project consist of widening this
stretch of roadway measuring approximately 0.75 miles. Some of the design issues encountered were the elevation changes
throughout the stretch of roadway and the amount of utilities located throughout this older corridor. The team worked diligently
to provide a technically sound and cost effective design that incorporated all of the client's requirements and needs. Mr.
Caraballo also executed the ermittin for the draina e s stem throu h Miami-Dade Count DERM.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
MIA Runway 9-27 Pavement Reconstruction, Miami-Dade County, PROFESSIONAL SERVICES CONSTRUCTION (II applicable)
FL 2006
d.
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (X] Check il project performed with current firm
Mr. Caraballo completed a joint effort to develop construction documents to resurface runway 9-27 at Miami International
Airport. Mr. Caraballo was involved in the demolition plan, pavement and geometry plan, grooving plan, pavement marking
lan, uantit take-off and runwa cross sections.
(1) TITLE AND LOCATION (City and State)
SFWMD Pump Station Hardening, Okeechobee, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (II applicable)
2005
e.
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE [ x ] Check il project performed with current firm
Mr. Caraballo has completed the Assessment of 9 pump stations located around Lake Okeechobee. Mr. Caraballo acted as a
liaison between SFWMD staff in the field and the consulting team. Mr. Caraballo also collected data at the sites useful in the
assessment and desi n of this ro'ect.
STANDARD FORM 330 (1V2004) PAGE 1
I
I
.~_~<~O~---~
~-"1!f3~~~'hq2::~':1_(Camplete-ane Sectlan E far each key persa(0Jf~ ~ " ;j
15. FIRM NAME AND LOCATION (Cftyand State)
CES Consultants, Inc., Miami Lakes, FL (Laboratory Facility)
16. EDUCATION (DEGREE AND SPECIALlZA TlON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
M.S., Industrial Engineering, Florida International University,
Miami, Florida
B.S., Mechanical Engineering, NED University of Engineering and
Technology, Karachi, Pakistan
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Mr. Uddin has over 9 years of engineering and materials testing experience working with federal, state and local
governments, where he coordinated testing and implementation of international standards specifications such as
outlined in ASTM, ACI, FAA, FOOT, CTQP standards to ensure regulatory compliance. Mr, Uddin is certified and
experienced in soil, concrete and asphalt inspection as per FOOT CTQP standards. He has successfully completed
projects in the areas of planning, permitting, construction, pavement, concrete, operations and maintenance, and an
array of other industrial engineering fields.
ineer
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
15 2
12. NAME
Aleem Uddin
19. RELEVANT PROJECTS
(1) TITLE ANO LOCATION (City and State) (2) YEAR COMPLETED
PTP Roadway Imwovements along NW 74th Street from NW 10th PROFESSIONAL SERVICES T CONSTRUCTION (If applicable)
Avenue to NW 84 h Avenue, Miami, FL Ongoing
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm
Mr. Uddin is currently providing materials testing services for this drainage and roadway project. The following are the tests
that Mr. Uddin is performing: Laboratory California Bearing Ratio (CBR) per ASTM-1883, standard proctor per AASHTO T-99
and ASTM 0-698, modified per AASHTO T-180 and ASTM-1577, and Lime rock bearing ratio (LBR) per FOOT standards.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami Dade Public Works Department, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Varies
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm
Mr. Uddin perfonns various laboratory testing duties on different projects for several of the departments in Miami-Dade
County. Testing requests include: soils, asphalt, concrete, and borings. The Departments include water & sewer, transit,
seaoort, aviation, & oublic works.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami International Airport South Terminal Dual Taxiway, Miami, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
FL Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I X] Check if project performed with current firm
C. Mr. Uddin is currently providing soils, foundations and material testing services on this project. He perfonns site visits,
inspections, meetings, coordination with all stake holders and supervision of all material testing as requested by the client. The
testing services include but are not limited to field and laboratory CBR tests, compaction test by sand cone method, proctor
and gradation for soils, steel inspection for underground structures at the concrete plant and others as per ASTM, ACI, and
CTOP standards.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Herbert Hoover Dike Rehabilitation, Reach I, US Army Corp of PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable)
Engineers, Lake Okeechobee, FL Ongoing
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
As a certified quality control laboratory for the US Army Corp of Engineers, Mr. Uddin is supervising and perfonning laboratory
testing on a/A samples (soil cement bentonite). This testing includes unconfined compressive strength as per ASTM 0-2166
and permeability tests as per ASTM 0-5084. Several field visits are required to check and evaluate the performance of the
Contractor field labs.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami International Airport Mover APM System, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X ] Check if project performed with current firm
e. Mr. Uddin is currently providing construction materials testing and inspection services on the base and sub-grade, cast-in-
place concrete. CES is monitoring construction materials and construction methods for compliance with the contract
documents. CES is perfonning the following tests: Backfill monitoring, compaction tests, standard proctor tests per AASHTO
T-99 and ASTM 0-698, modified proctor tests per AASHTO T-180 and ASTM-1577, concrete laboratory tests per ASTM C-31 ,
strenQth tests per C-39 usinQ C-617 or C-1231
STANDARD FORM 330 (1V2004) PAGE 1
.*~2~~PR _.~
If.!?H!t\{~~<:~}:::> ~~~(Complete oneiSectlon E for each key person.) t,;.. atl
12. NAME
Ashraf Iqbal, E.!.
13. ROLE IN THIS CONTRACT
Assistant Laboratory Manager
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
6 1
15. FIRM NAME AND LOCATION (City and State)
16. EDUCATION (DEGREE AND SPECtALlZATlON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DtSCtPLlNE)
M.S., Civil Engineering and Environmental Testing, Florida
International University, Miami, Florida
B.S., Civil Engineering, Osmania University, Hyderabad,
India
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Mr. Uddin has over 5 years of Civil Engineering Experience. He has performed work on Miami Dade county projects,
Broward County projects, and worked with research at Florida International University. Mr. Iqbal has coursework in
hazardous waste materials, wastewater treatment, highway and bridge design, as well as Air Pollution Control.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami Dade County Public Works Department, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (II applicable)
Varies
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I X] Check il project performed with current firm
a. Mr. Iqbal is currently performing various field and laboratory testing duties on several projects for various departments of
Miami Dade County. The departments include: Public Works, Water and Sewer, Department of Transportation, Seaport, and
Aviation. The material testing services requests include: soils, asphalt, concrete, and boring. The various projects Mr. Iqbal is
performing work on are: Roadway Improvements at NW 74th Street; NW 10ih Avenue to NW 84th Avenue, Two Lane Road at
SW 34th Street from SW129th Avenue to SW 128th Avenue, Baroque Estates, SW 30th Street and SW 144th Avenue, MIA
South Terminal Dual Taxiwav, MIA Mover APM Svstem
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
United States Army Corps of Engineers, FL PROFESSIONAL SERVICES CONSTRUCTION (II applicable)
Ongoing
b. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE [ X] Check il project performed with current firm
Mr. Iqbal is currently performing various field and laboratory tests on several projects for the United States Army Corps of
Engineers. Testing requests include Soils, asphalt, concrete, and Permeability. Testing Projects Include: Hoover Dike, Big
Cypress National Parks, Kissimmee River, and C-111 Canal, just to name a few.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami International Airport South Terminal Dual Taxiway, Miami, PROFESSIONAL SERVICES CONSTRUCTION (II applicable)
FL Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE IX) Check il project performed with current firm
C. Mr. Iqbal is currently providing soils, foundations, and material testing services on this project. He performs site
visits, inspections, meetings, coordination with all stake holders and supervision of all material testing as
requested by the client. The testing services include but are not limited to field and laboratory CBR tests,
compaction test by sand cone method, proctor and gradation for soils, steel inspection for underground structures
at the concrete plant and others as per ASTM, ACI, and CTap standards.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Testing Laboratory & Field Technician, Herbert Hoover Dike PROFESSIONAL SERVICES CONSTRUCTION (II applicable)
Rehabilitation, Reach I, US Army Corp of Engineers, Lake Ongoing
d. Okeechobee, FL
(3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE I X] Check il project performed with current firm
As a certified quality control laboratory for the US Army Corp of Engineers, Mr. Iqbal is performing laboratory testing on O/A
samples (soil cement bentonite). This testing includes unconfined compressive strength as per ASTM 0-2166 and permeability
tests as per ASTM 0-5084. Several field visits are reauired to check and evaluate the performance of the Contractor field labs.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
City of Miami Gardens, Miami Gardens, FL PROFESSIONAL SERVICES CONSTRUCTION (II applicable)
Ongoing
e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I X) Check il project performed with current firm
Mr. Iqbal performs Field and laboratory testing on several Urban Development Projects. Testing requests include; concrete,
soils, and asphalt. Projects Include: Carol City Community Center, Rolling Oaks Park Tennis Court
Brentwood Park and Pool
STANDARD FORM 330 (1{.1004) PAGE 1
13. ROLE IN THIS CONTRACT
Construction Inspector
a. TOTAL
13
3
15. FIRM NAME AND LOCATION (City and State)
CES Consultants, Inc., Miami Lakes, FL (Headquarters)
16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Construction Management, Construction Inspection Underground
Utilities Inspection, Safety in the Construction Field, Extensive
Document Control in The Quality Assurance and Quality Control
aspect of Construction Projects.
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Ms. Ford has 13 years of experience in the field of construction and construction inspections. She has participated in the
construction and construction management of underground utilities including water main installation, sanitary sewer
force main installation, sanitary sewer gravity main installation, sanitary sewer lift station construction, storm sewer
installation, and storm sewer pump station construction. Ms. Ford is also well equipped in producing accurate
documentation in the aspect of Quality Control and Quality Assurance Construction Documentation.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Waterworks 2011, City of Ft. Lauderdale, Ft. Lauderdale, FL PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable)
Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm
a. Ms. Ford worked as a Resident Project Representative on various projects for the Fort Lauderdale Waterworks 2011 project..
Ms. Ford conducted daily inspections of the ongoing construction and prepared daily reports indicating all progress made
during the construction activities, and she conducted weekly progress meetings. Ms. Ford also verified all payment requisitions
prepared and submitted by the contractors, coordinated all required site testing, participated in community relations, and
prepared and verified all documentation reauired to properly close-out the individual proiects.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Various Debris Management Contracts, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Varies
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm
b. Ms. Ford provided debris monitoring services on various debris management contracts throughout the state of Florida. Her
responsibilities included field verification of asset conditions, defining property lines on the field, monitored debris collection operations,
verified truck hauling activities, approved material delivery tickets, prepared daily reports, and prepared all documentation required to
properly close-out the individual projects. In addition, Ms. Ford participated in community outreach by working closely with property
owners to explain procedures and activities and assuring the publiC of all safety precautions.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Various Roadway & Underground Utilities Construction Projects, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
FL Varies
c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm
Ms. Ford, as an equipment operator, placed material for road, bridges and approaches as per plan. Ms. Ford also inspected
the placement of water, sewer, electrical, and cable locations per plans. She also reviewed in place density and moisture
content readings to determine passes and compact modes. Additionally, Ms. Ford worked closely with DOT inspectors,
enqineers, surveyors, utility, traffic liahts and asphalt crews to successfully coml lete the construction activities.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Marlins Ballpark Stadium, Miami, FL PROFESSIONAL SERVICES -, CONSTRUCTION (If applicable)
2012
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
Ms. Ford performs on-site field observations to oversee construction operations related to underground utilities of the public
infrastructure, verify contractor's compliance with the contract documents and applicable standards and regulations, review of
change order requests, review construction documents and As-Built drawings.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Kendall Soccer Park, Miami-Dade County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
2009
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X) Check if project performed with current firm
Ms. Ford worked as field inspector on the Kendall Soccer Park project. The major construction components of this project are
e. the installation of four new artificial turf soccer fields, construction of a new restroom facility, the construction of a new parking
lot, construction of a water main extension, new irrigation system interconnected to the existing system and the resurfacing of
the existing parking lot. Ms. Ford conducted daily inspections of the construction activities and created daily reports that were
provided to the client. Ms. Ford verified compliance with the contract plans and specifications and also managed the RFI log,
the change order log, and the shop drawing log. She also conducted weekly progress meetings with the owner and the
contractor.
STANDARD FORM 330 (fV2004) PAGE 1
21. TITLE AND LOCATION (City and State)
East Miramar Redevelopment Transmission & Distribution
Water Main Improvements - Miramar, Florida
20. EXAMPLE PROJECT
KEY NUMBER
1
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2009
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of Miramar
b. POINT OF CONTACT NAME
Ronald Eyma
c. POINT OF CONTACT TELEPHONE NUMBER
(954) 538.6806
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The City of Miramar, in an effort to provide their residents with the best water service, has identified
sectors of the city requiring upgrades to the existing water mains. The deficiencies identified in these
areas are inadequate fire protection, low service pressures and aging infrastructure.
CES has been contracted to design approximately 72,000 L.F. of 6-inch water main and services for
the City of Miramar, including a directionally drilled 8-inch Ductile Iron Pipe section of 120 L.F. The
functionality of the design is for improved fire protection throughout the neighborhoods, which currently
has 2-inch and 4-inch water mains. CES is also tasked with locating required fire hydrants to be
connected to existing 6-inch and greater water mains. The final product will provide residents with
essential fire protection, and it will also increase the water flow and provide better water pressure to the
residents. The project is bound by: Pembroke Rd. to the Florida Turnpike and from University Drive to
SW 68th Avenue.
The CES design team has been vigilant in meeting with the client to discuss the progress throughout
every phase of the project thus ensuring that the client's expectations are met, and reaching to a
completion of the design ahead of the anticipated finish for this fast paced project.
Services Provided:
./ Route Analysis
./ Design and Plans Preparation
./ Development of Contract Specifications
./ Water Master Plan for Project Area
./ Striping & Pavement Marking Inventory
./ Existing Utilities & Future Project Coordination
./ Permitting
./ Construction Phase Services
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
3. CES Consultants, Inc. Miami Lakes, FL Design Services
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c.
f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 1fV2004) PAGE 7
~ F -EXAMPLE-PROJECTS-"iHiCH'iiEsTTi:;::USrRATEPRoPOsE~-' ..
20. EXAMPLE PROJECT
I:~P~~~~l~J~ I'9~~~~~1~ CONT~Asr:.;;:'~.~, "
resent as many projects as requested by the agency, or 10 'projects, if not specified.
. . , ~.' ,,":;t~~~~~!'.,;,1~,9,'1J?~~jr:E;~.it;., ',I ""
21. TITLE AND LOCATION (Cffy and State)
SW 27th Avenue Roadway Reconstruction
Miami-Dade County Public Works Department
Miami, Florida
KEY NUMBER
2
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Ongoing
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Miami-Dade Public Works
Department
b. POINT OF CONTACT NAME
Hector Aleman, P.E.
c, POINT OF CONTACT TELEPHONE NUMBER
305.375.4866
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
CES is currently providing engineering analysis and design for a closed storm water management system
of approximately 0.75 mile along SW 27'h Avenue from US-1 to Bay shore Drive. The purpose of the
project is traffic improvements through roadway widening, medians, redesign of intersections and
improvements to drainage, parking, lighting, signalization and landscaping. The project is located in the
Coconut Grove neighborhood of the City of Miami. The land use is a combination of residential and
commercial. Since the roadway is part of an older, well established neighborhood, many different utilities
are installed within the Right-of-Way. The project corridor includes a 30-inch water main and smaller water
mains, gas, multiple fiber-optic cable duct banks, sanitary sewers and force mains. Other complicating
factors in the design are the elevations: low grades and high groundwater table at the southern end of the
project, which is directly adjacent to the Biscayne Bay, higher elevations in the mid section, and 'normal'
elevations around the northern end.
The proposed drainage design has been developed in accordance with the guidelines set forth by the
County and the Florida Department of Transportation. The design consists of approximately 70 structures,
3,000 LF of piping and 2,000 LF of French drains, divided into eight (8) independent, closed systems. By
creating independent systems, CES was able to develop a design that satisfies the requirements, while at
the same time achieving significant cost savings to the client compared to their customary approach of
creating interdependent systems
Services Provided:
./ Drainage Design
./ Hydraulic Analysis
./ Permitting
./ Interagency Coordination
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)
a. CES Consultants, Inc, Miami Lakes, FL
(1) FIRM NAME (2) FIRM LOCATION (City and Stale)
c.
f. (1) FIRM NAME (2) FIRM LOCATION (City and State)
h. (1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE
Design Services
(3) ROLE
(3) ROLE
(3) ROLE
STANDARD FORM 330 (ty.2004) PAGE
20. EXAMPLE PROJECT
KEY NUMBER
3
21 TITLE AND LOCATION (City and State)
Fort Lauderdale Water Works 2011Water, Sewer. Stormwater
and Force Main, Fort Lauderdale FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Ongoing
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of Fort Lauderdale
b. POINT OF CONTACT NAME
Eva Gibson I CMTS Florida, LLC
c. POINT OF CONTACT TELEPHONE NUMBER
(954) 561-9197
24. BRIEF DESCRIPTION OF PROJECT AND RELEV ANCE TO TIllS CONTRACT Ilnelllde scope. si=e. ond cost}
The City of Fort Lauderdale, in an effort to provide their residents with the most up to date water, sewer and
drainage services, has developed a long term capital improvements project to improve the city's infrastructure.
Under this project, the City is investing in excess of $550 million towards these improvements, the majority of
which are to be completed by 2011,
CES has been contracted to provide construction administration and oversight for the installation of various
infrastructure improvements. CES staff are placed on a full time basis to observe several work crews in various
stages of completion. We then produce daily reports that the client can use towards payment requisition
verification, schedule compliance, work site safety, and verification of construction adhering to the design
specifications.
Since our reports are developed and submitted to the client daily, the client is able to maintain the project
schedule and make corrections as needed.
Below is a list of some of the construction activities observed by our staff:
./ Water Main Installation
./ Sanitary Sewer Force Main Installation
./ Sanitary Sewer Gravity Sewer Installation
./ Pump Station Upgrade and Installation
./ Drainage Installation
./ Site Grading
./ Swale Reconstruction
./ Roadway Reconstruction
./ Sidewalk Reconstruction
./ Driveway Reconstruction
BEFORE
.
r
...--
I
--...
l
The CES family always places the client's
concerns and needs first. To ensure client
satisfaction, we work closely with the client. We
discuss the progress throughout every phase of
the project thus ensuring that the client's
expectations are met.
~
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
CES Consultants, Inc.
(2) FIRM LOCATION (City and State)
Miami Lakes, FL
(3) ROLE
Construction Oversight
(3) ROLE
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
c.
f.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) ROLE
STANDARD FORM 330 (&f2004) PAGE 5
20. EXAMPLE PROJECT
KEY NUMBER
4
21. TITLE AND LOCATION (Cfty and Stale)
City of Homestead Flagship Cinema. Homestead, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2005
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of Homestead
b. POINT OF CONTACT NAME
PBS&J - Roberto S. Ortiz, P .E.
c. POINT OF CONTACT TELEPHONE NUMBER
305.704.4429
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
As part of the City of Homestead's Block Grant program, the City obtained the services of a consultant team to design
and provide construction management and inspection services for the construction of a new Flagship Cinema and
associated infrastructure improvements, CES provided Design, Construction Management and Inspection services.
CES was also responsible for certifying the work performed, in compliance with City of Homestead construction
standards. The new cinema is located on the southwest corner of Campbell Drive and the Florida Turnpike. The
following is a list of the services provided by CES:
./ Design Services
. Research and coordination with utility companies
. Review of Plans at all phases of design
. Permitting Services
. Review of construction cost estimate
./ Construction Management Services
. Coordination of contractors construction activities
. Coordination between the client, engineer, and contractors
. Tracking material quantities
. Payment requisition review
. Creating daily progress reports
./ Construction Inspection Services
./ Certification of Completed Work
During the remedial action activities at the site, CES participated in first clearing and grubbing the entire site to
remove 1,056 tons of concrete debris materials, approximately 800 tons of root mat and root ball. In addition to the
construction management, CES staff provided inspection services and project certification for the construction of a
new 4-lane access roadway, including:
./ Installation of new 8-inch water main
./ Installation of new sanitary sewer;
./ Construction of a new submersible pump pumping station and force main;
./ Installation of drainage boxes and catch basins;
./ Construction of parking lot, signage, sub-base installation, asphalt paving, pavement markings, lighting
work, installation of foliage and street landscaping.
All work supervised to meet FOOT, City and County standards.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. CES Consultants, Inc. Miami Lakes, FL Design, Construction Management
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
h. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (tV2004) PAGE
";r;' "F.EXA-MPLe.~-~
. ';", .' ,QUALIFICATIONS FOR THIS CONTRACT _ f , .
~. {Present as many projeCts"'a~,;esied by the agency, or" fa projects, if n'ot specified. , i
. ~1 . ~ ,~~;~~~ j\;~~w;~~'J.Ei~!~lJjii~rg/~l!iiL ." : !
20. EXAMPLE PROJECT
KEY NUMBER
5
21. TITLE AND LOCATION (City and State)
Marlins Ballpark Stadium, Miami, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2012
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Miami Dade County
b. POINT OF CONTACT NAME
URS Corporation (client)
Stephen Baumal
c. POINT OF CONTACT TELEPHONE NUMBER
305.884.8900
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost)
The future home of the Florida Marlins Major League Baseball team will be a first-class stadium owned by Miami-
Dade County. CES as a sub-consultant to URS was selected by Miami-Dade County to provide Owner's
Representative Services for the construction of this new $515-million stadium. It is currently being constructed on 17
acres in the Little Havana section of Miami on a brownfield site. The project site was previously the home of the
historic Orange Bowl football stadium, which was demolished in 2008.
The 37,000-seat stadium will have a retractable roof and will be fully air conditioned when the roof is closed. The
ambient temperature inside the stadium with the roof closed will be 75 degrees Fahrenheit. The structural steel roof,
which will weigh 8,300 tons, is designed to open or close in approximately 14 minutes, which is essential for
unpredictable Florida storms. Twelve super columns will support the roof structure. Four five-story parking garages
and six surface parking lots accommodating approximately 6,000 vehicles are part of the project and will be financed
by the City of Miami. CES has been tasked to perform on-site field observations to oversee construction operations
related to underground utilities of the public infrastructure, verify contractor's compliance with the contract documents
and applicable standards and regulations, review of change order requests, review construction documents and As-
Built drawings. Construction is scheduled to be completed in April 2012, prior to the opening of the baseball season.
~. -:".>" -:'~-' ....; ,_~- ~ .& &. - _.... 7"L--~--"" .- .....""'_..,_ r-_
" _--.. ~ ~.. -'l;::."":''':; --: _"'"'.... ~_ ' ...~?~..... ~~, ..J>~ "-.~
- "'\o~~- ...,~ "lo ""/"-~ -I'~ ~ ~t -", .... "'"- ..... .... N...
....,>~v .....,>-At.,~ ~ ...?~ ;..".,... .,.- co........ ''''.. ...
~-~ '"S"::--~.......1J~ : 1"-..- -...~.;;!~.7~~~
"" ~ - , :P~~ .. · ".' #It,,"., ;'
~~~~'~~~~.'~' - ltJI',
r oJ" .:-~ :>:.: .l~~~.....
....".... .~.-..
....-- ...,.,. ...~ .. . .-
. ..
~~
'"
"
...
...
..
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. CES Consultants, Inc. Miami Lakes, FL Owner's Representative
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
h. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (qt2Q04) PAGE
20. EXAMPLE PROJECT
KEY NUMBER
6
21. TITLE AND LOCATION (City and State)
Herbert Hoover Dike Rehabilitation, Reach 1 Cutoff Wall, lake
Okeechobee, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Ongoing
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
United States Army Corp of
Engineers
b. POINT OF CONTACT NAME
Saxby Anderson, P.E.
c. POINT OF CONTACT TELEPHONE NUMBER
561.472.3500
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Lake Okeechobee is the second largest fresh water lake that lies entirely within the United States. The
143-mile earth dike system that encircles lake Okeechobee has numerous water controls that provide
flood reduction, navigation, recreation and fresh water for the communities of South Florida & other local
and federal agencies. The Herbert Hoover Dike Rehabilitation, Reach 1, Seepage Cutoff Wall project
consists of the construction of a soil, cement, bentonite mix cutoff wall to control seepage through and
under the embankment. Reach 1 started form Belle Glade and ended at Port Mayaca.
CES Consultants, Inc. staff are perfromin O/A materials testing services for all four phases of the above
stated Army Corp project and is performing the following tests as per ASTM, AASHTO, Florida
Department of Transporation (FOOT) Standards.
./ Collect & Transport Special Soil-Cement Cylinders and Cores Samples from the site & from the
Contractor's on site Laboratory to the CES Laboratory for testing
./ Perform 28- Days unconfined compressive strength testing as per ASTM 0-2166
./ Perform Permeability tests on soil-cement bentonite samples as per ASTM 0-5084 to check the
cutoff wall in-place permeability
.,11-
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE
a. CES Consultants, Inc. Miami lakes, Florida Q/A Materials Testing
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
h. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (ty.!004) PAGE
20. EXAMPLE PROJECT
KEY NUMBER
7
21. TITLE AND LOCATION (City and State)
Pump Station Hardening
South Florida Water Management District
Miami, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2005
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
South Florida Water Management
District
b. POINT OF CONTACT NAME
TV Un I HJ Ross, Inc. (client)
Gino A. Valderama, P.E.
c. POINT OF CONTACT TELEPHONE NUMBER
305.567.1888
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost)
The South Florida Water Management District required the updating of several pump stations. These
pump stations were design by the USACOE and are of the 1961 to 1995 vintage. The District wanted to
update the pump stations to current South Florida Building Code standards, and they also wanted to
make adjustments for noise abatement. This project was very important to the District, because these
same pump stations are currently used for water control throughout South Florida, including Lake
Okeechobee.
The firm was responsible for the hardening of the pump station buildings enabling them to operate
during extreme weather conditions while protecting the operators from the weather related dangers.
Specifically the firm provided the structural and mechanical engineering designs and cost estimating for
the layer of reinforced concrete on the exterior of the buildings as well as the reinforcement of the air
intakes and steel encasements and the concrete for the exterior conduits and pipes for the "hardening"
of the pump stations. Additionally, CES participated in a noise abatement study to help reduce the
impact of the high decibels within the pump stations to the operators.
CES has an excellent working relationship with T.Y. Un, and the success of CES can be attributed to
the level of attention and responsiveness placed on all of our projects,
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
CES Consultants, Inc.
(2) FIRM LOCATION (City and State)
Miami, FL
(3) ROLE
Structural & Mechanical Engineering
(3) ROLE
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
c.
f.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) ROLE
STANDARD FORM 330 (&'2004) PAGE 5
20. EXAMPLE PROJECT
KEY NUMBER
8
21. TITLE AND LOCATION (City and State)
5-3320 Hurricane Hardening Structural Review
South Florida Water Management District
Miami, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2011
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
South Florida Water Management
District
b. POINT OF CONTACT NAME
Jordan Jones & Goulding (client)
David Scott
c. POINT OF CONTACT TELEPHONE NUMBER
561.799.3855
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost)
This project involves the hardening and upgrading of the S-332D Pump Station located near
Homestead, Florida in Miami-Dade County. The project will involve the hurricane hardening of the
pump house and the installation of bullet-proofing for the walls, roof and roofing system, exterior doors,
louvers, HVAC upgrades and protective opening hoods. Also new weather-proof roof-mounted
equipment access hatches, OSHA safety ladder and roof perimeter safety railings and overall exterior
re-painting of the pump house walls and supporting/exterior concrete foundations.
CES is providing Structural Review on this project.
~
~..!:. . ~
'~;:'~~~~;J
~. ~~.
A'1or' ill
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. CES Consultants, Inc. Miami, FL Structural Review
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (fV2004) PAGE 5
21. TITLE AND LOCATION (City and State)
Hurricane Katrina Debris Monitoring
Miami-Dade County, Florida
20. EXAMPLE PROJECT
KEY NUMBER
9
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2006
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Miami Dade County
Public Works Department
b. POINT OF CONTACT NAME
Octavio Marin, P.E.
c. POINT OF CONTACT TELEPHONE NUMBER
305.375.2116
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
On August 23, 2005 Hurricane Katrina formed over the
Bahamas and went on to cross over South Florida.
Although only a Category 1 when it crossed South
Florida, it formed extremely fast and left very little time
for preparation. CES Consultants, Inc. was contracted
to provide a wide range of services including Debris
Monitoring and Management throughout Miami-Dade
County for the Public Works Department under a $4M
master consulting contract. CES' key personnel
immediately met with the County in an effort to provide
assistance during this emergency.
,~ J
"'----
.#... -
,A;. .r:-_ w'- ,;.j'
t... ....:., ~ '~
. ~~
...."1 _
J
CES' employees worked as an extension of the County providing everything from Project Management,
Debris Monitoring and Asset Inspections. Below is a detailed list of the services provided by CES staff.
Debris Monitoring Services included:
./ Provided trained and equipped debris monitors as required by the agency.
./ Provided each monitor with a daily schedule and assignment.
./ Monitoring and records collection for all contract haulers according to agency standards.
./ Monitoring and records collection for all material movement according to agency standards.
./ Maintained and updated debris collection maps and spreadsheets throughout the county.
./ Performed a survey of affected areas and identified debris to be removed, potential hazards, and
county assets requiring repairs or replacement.
./ Investigated and documented any damage to public or private property that occurred during any
debris removal.
./ Coordinated with County staff on all field activities.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (CJty and State) (3) ROLE
a. CES Consultants, Inc. Miami Lakes, FL Debris Monitoring
(1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE
C.
f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
h. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (/Y2004) PAGE
20. EXAMPLE PROJECT
KEY NUMBER
10
21. TITLE AND LOCATION (City and State)
Hurricane Planning & Preparation Workshop
City of Jacksonville
Jacksonville, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2009
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of Jacksonville
b. POINT OF CONTACT NAME
Alice Jones
c. POINT OF CONTACT TELEPHONE NUMBER
904.591.9625
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost)
CES was contracted by the City of Jacksonville's (COJ) Public Works Department, to provide an
interactive workshop for Public Works employees and associated interagency organizations. The main
objective was to test the City's preparedness and ability to coordinate a massive effort after a major storm
with Hurricane Preparedness Drills involving emergency officials and support personnel from every major
City agencies. CES provided training in all aspects of the debris management cycle, reviewing the existing
Public Works procedures, the City's Debris Management Plan, and the Hurricane Interagency
Coordinating Procedures.
Through engaging in hands-on activities, participants were given the opportunity to assist in developing
new procedures, and make recommendations to the current plan. The workshop also tested and analyzed
the effectiveness of the associated database, providing a simulation session testing the web-based debris
monitoring reporting and documentation functions.
The exercise also gave officials the opportunity to test lines of communication between the state and local
emergency operations centers, the FEMA-approved hurricane monitoring database and its ability to
generate the necessary reports mandated by FEMA. The COJ's emergency response staff and affiliates
were able to assess their preparedness in response to an event.
The following actions were addressed due to this exercise:
./ Activation of the plan
./ Establishing debris removal priorities
./ Activation of standby contracts
./ Tracking of resources
./ Meetings and briefings
COJ
lil.ltiIIU[~IJUm
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. CES Consultants, Inc. Jacksonville, FL Hurricane Preparedness I Debris
Management
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
h. (1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE
STANDARD FORM 330 (&'2004) PAGE
I ,"., :?;~}. .. . . _. #.h_>' .l'~
" B.1a:l1l..:J::I :~"1.]~I~I::I"':(.iJ ~. f.!J .:1.:..' (.]~11:m1 :t:~., ~ I ~:.I :{ell:l.. .....~_ I;"
~\' , ".
-
28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in "Example Projects Key" section below first, before completing
26. NAMES OF KEY PERSONNEL 27. ROLE IN THIS CONTRACT table. Place "X" under project key number
(From Section E, Block 12) (From Section E, Block 13) for participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10
Rudy M. Ortiz, P.E. Principal in Charge X X X X X X X X X X
Luis A. Olivares, P.E. Director of Engineering
Werner A. Reinefeld, P.E. Design Engineer
Gustavo A. Eckardt, P.E. Project Engineer X X X X
Stephen Manis, P.E., LEED Sr. Project Manager
AP@
Jose A. Compres, P.E. Structural Engineer X X
Jose Caraballo Project Manager X X X
Aleem Uddin Testing Laboratory X
Manager I Qualitv Enoineer
Ashraf Iqbal, E.!. Assistant Laboratory X
Manager
Vanise J. Ford Construction Inspector X X
29. EXAMPLE PROJECT KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
1 East Miramar Redevelopment Transmission & 6 Herbert Hoover Dike Rehabilitation, Reach 1 Cutoff
Distribution Water Main Improvements Wall, Lake Okeechobee
2 SW 27'h Avenue Roadway Reconstruction 7 SFWMD Pump Station Hardening
3 City of Ft. Lauderdale Waterworks 2011 Water, 8 SFWMD 5-3320 Hurricane Hardening Structural Review
Sewer, Stromwater and Force Main
4 City of Homestead Flagship Cinema 9 Hurricane Katrina Debris Monitoring
5 Marlins Ballpark Stadium 10 Hurricane Planning & Preparation Workshop
STANDARD FORM 330 (6/2004) PAGE 4
::'",--- .,~ .~..=..".~~", -~- -'.' ...., .'W.'. -,",:"'''''''"-:-1.''' 't:-< _~~",.~~. .
CES CONSULTANTS, INC. (CES) is a minority-owned and operated firm established in September 2001, to provide
professional engineering and construction management services to private and municipal clients in The State of Florida. CES
is authorized by the Florida Department of Business and Professional Regulation to offer professional engineering services
in the state of Florida, and holds MBE certifications from the following agencies: Miami-Dade County, City of Miami, Dade
County School Board, Broward County School Board, Palm Beach County School District, North Broward District Hospital,
South Florida Water Management District, Florida Department of Transportation, Jacksonville Small Business Enterprise,
City of Tampa MBE, City of Orlando MBE, Palm Beach County SBE, City of West Palm Beach SBE and u.s. Small Business
Administration.
The firm's professional staff have over 100 years of combined experience in a variety of disciplines including:
Program/Construction Management; Project Control/Cost Control; Primavera (P3e) Scheduling; Estimating; Civil
Engineering; Water & Wastewater; Structural Engineering; Construction Engineering & Inspection; Geotechnical Services;
Permitting Services; and Owner Representation.
CES key personnel comprises of a diverse group of engineering professionals and construction experts with an emphasis in
quality of work and client satisfaction. Our senior staff brings over 65 years of combined experience in civil, environmental
and structural engineering. The firm's staff experience includes design and construction management for over $150 million
of roadway and neighborhood improvement projects in New York City; Program manager for the $250 million
infiltration/infiltration/inflow program for Miami-Dade Water and Sewer Department; and Program manager for the
$lbillion pump station improvement program for Miami-Dade Water and Sewer Department. This program consisted of
planning, preparation of basis of design reports, design, permitting, and construction phase services for over 900 pump
station and over 100 miles gravity and force main lines. Further Construction Management experience has been with the
Department of Veterans Affairs in Miami totaling over $3 million dollars as a Prime Contractor on various projects. We
have also performed Quality Control on Several School Board Projects in Dade, Broward, and Palm Beach County as well as
Dade County Sports and Entertainment Complexes such as The American Airlines Arena and The Performing Arts Center.
CES has a state-of-the-art materials testing and inspection laboratory located in Miami, FL Our mission is to deliver
outstanding Material Testing, and Inspection Services.
CES works in conjunction with owners, professional design teams and contractors to assure conformance with project
specifications. Our firm has an excellent proven track record of performance, and prompt response to testing and
inspection services. Our services include a full range of soil, concrete, and asphalt testing. We also offer detailed Inspection
Services as well as on Site Consulting for Commercial/Residential, Private Sector, Federal Government, and Municipalities.
Construction Management
CES's experienced professionals offer various areas of expertise in Construction Management. Our firm has completed
various projects with clients such as the United States Army Corps of Engineers, U.s. NAVY, Veterans Administration, United
States Air Force, and the Department of Homeland Security to name a few. Our Construction Management team provides
exceptional quality service to all of our clients. During a remedial action activities at a site, CES participated in first clearing
and grubbing the entire site to remove 1,056 tons of concrete debris materials, approximately 800 tons of root mat and
root ball materials that were deemed to be in contact with the ash waste, and solid waste (trash).
Design Services
CES's experienced Professional Design Engineers perform various designs in several areas, such as Structural, Water and
Sewer, Stormwater, and Roadway. CES has completed various design projects with clients such as The City of Miramar,
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 6/2004
STANDARD FORM 330 (1/2004) PAGE 1 of 14
Miami Dade County, Broward County Aviation Department, City of Miami Gardens, and South Florida Water Management
District to name a few.
Cost Estimating
Our cost consulting staff consists of personnel who are certified cost engineers, general contractors, and professional
engineers with extensive experience in cost estimating, scheduling and cost control. We have performed comparative cost
analysis of systems and value engineering studies in response to claims for a wide range of public and private clients. We
have offered cost estimation on several projects.
./ Miami Mover Extension at Miami International Airport. - The people mover system is a light rail mover system
operating between the Miami International Airport, The Intermodal Center and the Rental Car Center. This system
will move passenger for a 1.3 mile distance in less than 4 minutes. The cost estimated by our firm was $267 Million.
./ Jacksonville Regional Transportation Center in Jacksonville Florida (JRTC) - JRTC is a new facility which will integrate
the Jacksonville Transit Authority bus lines with the Skyway and the local Greyhound station. This location will
include the relocation of the Amtrak station to the historic Union Terminal adding even greater connectivity and
commuter rail operations in the future. The cost estimated by our firm with Turner Construction was $180 million.
./ Department of Veterans Affairs - The Veterans Hospital in Miami, Key West, Hollywood, Oakland Park, and Orlando
has required several extensive renovations to existing facilities as well as many minor projects. CES has performed
as the Prime Contractor on all of these projects supplying cost estimation, scheduling and construction
management. Projects estimated total over $3.5 million in the past 3 years.
./ Pavarini Construction (School Board prajects for Dade, Broward, & Palm Beach) - School Board Projects have
consisted of new facilities, renovations, and additions, Cost Estimation performed by CES included Construction
Management, Quality Control, and Assistant Project Management. We have cost estimated over $1million in the
previous areas of work as well performed the functions associated.
CES is committed to provide a wide range of quality services at competitive rates. We have a quality system in place that is
managed and Supervised by our Professional Engineers. CES provides testing and inspection services as per ASTM, AASHTO,
CMEC, ACI and FOOT Standards. The following are descriptions and testing services that our lab is currently offering.
Soils. Earthwork
CES performs proper laboratory testing and analysis of soils to determine their physical properties. This is an integral part
of design and construction of structural foundations. We are committed to provide the soil laboratory results to our client
within the prescribed time limit in order to move on to the next phase of construction without any delay.
Concrete. Aggregate. And Masonry Work
Our ACI Certified Technicians and Inspectors service all phases of construction, and tilt up panels. CES' concrete experience
ranges from small pours to complicated slabs to bridge decks. All concrete cylinders and cubes are cast and processed
according to the ASTM and AASTO specifications. Our curing room is capable of holding more than 1000 cylinders,
Miscellaneous Testing/Inspections
CES also offers several other testing and inspection services. Below are some we have highlighted:
./ Asphalt Field and Lab Inspection
./ Reinforcing Bar Placement Inspection
./ Visual Welding Inspection
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 6/2004
STANDARD FORM 330 (1/2004) PAGE 2 of 14
-/ Magnetic Particle Testing
-/ Ultrasonic Examinations of Welds
-/ Post Tension Inspection
-/ Bolt tightening Inspection
-/ Roof Inspection
-/ Pile Load Testing
-/ Pier and Piling Inspection
-/ Environmental Testing
-/ Water
-/ Soils
-/ Air
-/ Mold
-/ Fire Proofing
-/ Corrosion Inspections
CES is committed to service. We offer an innovative approach which enables us to deliver an unrivaled level of
professionalism and expertise.
I. AUTHORIZED REPRESENT A TIVE
DATE
May 11th, 2010
Rudy M. Ortiz, P.E., CGC I CEO
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 6/2004
STANDARD FORM 330 (1/2004) PAGE 3 of 14
~.
.... ...
.' '. .., RFQ No. 10-04-01
~.""
'~~~:~.~:.,~~
~ . . - - . -. .- . . . - -- . .
3. YEAR ESTABLISHED 4. DUNS NUMBER
2001 021359208
5. OWNERSHIP
!,.~ ~~~~rfl" ~.l"
~.
.. ,~~-,. --:;<:~ :;rr--J!..-,"'....
- -
. .
2a. FIRM (OR BRANCH OFFICE) NAME
CES Consultants, Inc.
2b. STREET
14361 Commerce Way, Suite 103
2c. CITY
Miami lakes
2d. STATE 12e. ZIP CODE
Florida 33016
6a. POINT OF CONTACT NAME AND TITLE
Rudy M. Ortiz, P.E., CEO
6b. TELEPHONE NUMBER
305-.827.2220
N/A
a. Function
Code
Aimorts;
Automation; Controls; Instrumentation
Construction Management
Cost Estimating
Dredging Studies and Design
Environmental Impact Studies, etc.
Environmental Planning
Environmental Remediation
GIS Services
Hazardous, Toxic, etc. Remediation
Recreation Facilities
Rivers; Canals; Waterwavs
Sewage Collection, Treatment, etc.
Solid Wastes; Incineration; Landfill
Storm Water Handling & Facilities
Unexploded Ordnance Remediation
Urban Renewal; Communi tv DeveL
Water Res,; Hvdrolol!v; Ground Water
Water SUDDlv; Treatment, etc,
Environ. Management & Compliance
Information Technology
Management Consulting
PROFESSIONAL SERVICES REVENUE INDEX NUMBER
16C. E-MAIL ADDRESS
rortiz@cesconsult.com
8a. FORMER FIRM NAME(S) (If any)
9. EMPLOYEES BY DISCIPLINE
b. Discipline
c. No. of Employees
(1) FIRM (2) BRANCH
6
AOS
AI2
CIS
CI8
D08
E09
Ell
EI2
G04
H03
R04
RII
S04
S07
SI3
UOI
U02
W02
W03
a. Profile
Code
02
06
07
08
10
12
14
]5
16
18
22
23
29
34
52
53
57
58
60
62
Administrative
Architect
Bio]ogist
CADD Technician
Chemical Engineer
Civil Engineer
Computer Programmer
Construction Inspector
Construction Manager
Cost Engineer / Estimator
Electronics Engineer
Environmental Engineer
GIS Specialist
Hydrologist
Sanitary Engineer
Scheduler
Structural Engineer
Technician
Transportation Engineer
Water Resources Engineer
Other Emolovees
2
9
5
4
1
1
1
1
2
1
1
2
2
38
Total
11. ANNUAL AVERAGE PROFESSIONAL
SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS
(Insert revenue index number shown at right)
a. Federal Work
b. Non-Federal Work
c. Total Work
2
6
8
1. Less than $100,000
2. $100,000 to less than $250,000
3. $250,000 to less than $500,000
4. $500,000 to less than $1 million
5. $1 million to less than $2 million
1. SOLICITATION NUMBER (If any)
a. TYPE
S Corporation
b. SMALL BUSINESS STATUS
SBA 8 (a)
7. NAME OF FIRM (If block 2a is a branch office)
N/A
8b. YR. ESTABLISHED
N/A
8c. DUNS NUMBER
N/A
10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
b. Experience
c. Revenue Index
Number
(see below)
12
20
2
15
4
1
2
6
1
2
6. $2 million to less than $5 million
7. $5 million to less than $10 million
8. $10 million to less than $25 million
9. $25 million to less than $50 million
10. $50 million or greater
12. AUTHORIZED REPRESENTATIVE
The fore oin is a statement of facts.
1.(1J;f3,
c\-
c. NAME AND TITLE
Rudy M. Ortiz, P.E., Chief Executive Officer
b. DATE
May 11th, 2010
STANDARD FORM 330 (6/2004) PAGE 6
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY
PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted to City of Sunny Isles Beach
~ CES Consultants, Inc.
fur Professional Engineering Services, RFQ No. 10-04-01
whose business address is 14361 Commerce Way, Suite 103
Miami Lakes, Florida 33016
and (if applicable) its Federal Employer Identification Number (FEIN) is 65- 0792884
(IF the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement:
2. I understand that a "publ ic entity crime" as defined in Paragraph 287.133(1)(g), Florida
Statutes, means a violation of any state or federal law by a person with respect to and directly
related to the transaction of business with any public entity or with an agency or political
subdivision of any other state or of the United States, including, but not limited to, any bid or
contract for goods or services to be provided to any public entity or an agency or political
subdivision of any other state or of the United States and involving antitrust, fraud, theft,
bribery, collusion, racketeering, conspiracy, or material misrepresentation.
3. I understand that "convicted" or "conviction" as defined in Paragraph 287 .133(1)(b), Florida
Statutes means a finding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial court of record relating to charges brought by
indictment or information after July I, 1989, as a result of a jury verdict, nonjury trial, or
entry of a plea of guilty or nolo contenders.
4. I understand that an "affiliate" as defined in Paragraph 287. I 33(1)(a), Florida Statutes, means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the management of the
entity and who has been convicted of a public entity come, The term "affiliate" includes
those officers, directors, executives, partners, shareholders, employees, members, and
agents who are active in the management of an affiliate. The ownership by one person of
shares constituting a controlling interest in another person, or a pooling of equipment or
income among persons when not for fair market value under an arm's length agreement,
shall be a prima facie case that one person controls another person. A person who
knowingly enters into a joint venture with a person who has been convicted of a public
entity crime in Florida during the preceding 36 months shall be considered an affiliate,
5. I understand that a "person" as defined in Paragraph 287.1 33(l)(e), Florida Statutes, means
any natural person or entity organized under the laws of any state or of the United States
with the legal power to enter into a binding contract and which bids or applies to bid on
contracts for the provision of goods or services let by a public entity, or which otherwise
transacts or applies to transact business with a public entity. The term "person" includes
those officers, directors, executives, partners, shareholders, employees, members, and
agents who are active in management of any entity.
6. Based on information and belief, the statement which I have marked below is true in a
relation to the entity submitting this sworn statement. (Please indicate which one (I) of the
following three (3) statements is applicable.)
~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(2) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(3) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or agents who are active in management of the entity, or any affiliate
of the entity has been charged with and convicted of a public entity crime within the past 36
months. However, there has been a subsequent proceeding before a Hearing Officers of the
State of Florida, Division of Administrative Hearings and the Final Order by the Hearing
Officer determined that it was not in the public interest to place the entity submitting this sworn
statement on the convicted vendor list. (Attached is a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS
FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH
DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE
PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY
PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD
AMOUNT PROVIDED IN SECTION 287,017, FLORIDA STATUTES FOR THE
C ~GOR F ANY CHANGE IN THE IN FORMA TION CONTAINED IN THIS
Ft\)
SIGNA URE OF FFIANT
'-
Luis A. Olivares, P.E.
(Printed or Typed Legal Name of Affiant)
State of Florida County of Miami -Dade
,2010 by
Notary Seal: C~ ~
Personally Known:
x
or Produced Identification
~~*;:rtt:. CAROlINA PENA
N"J;;.\~ MY COMMISSION 1/ DO 614972
~'~~%$ EXPIRES: November 21,2010
;~P'flt~'" Bonded Thru Notary Public Underwriters
Identification Produced
N/A
NON-COLLUSIVE AFFIDA VIT
State of Florida)
C t f Miami-Dade
oun y 0
Luis A. Olivares, P,E.
and says that:
being first duly sworn, deposes
(1) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully infonned respecting the preparation and contents of the attached Bid and
of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded, conspired,
connived or agreed, directly or indirectly, with any other Bidder, finn, or person to submit a
collusive or sham Bid in connection with the Work for which the attached Bid has been
submitted; or to refrain from bidding in connection with such Work; or have in any manner,
directly or indirectly, sought by agreement or collusion, or communication, or conference with
any Bidder, finn, or person to fix the price or prices in the attached Bid or of any other Bidder, or
to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder,
or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage
against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, c s iracy, connivance, or unlawful agreement on the part of the Bidder or any
other ts a ts pr n~rs, employees or parties in interest, including this
Affiant. (\ T,.
\ Luis A. Olivares, P.E.
(Printed or Typed Legal Name of Affiant)
State of Florida County of Miami-Dade
Sworn to and subscribed before me this
13Th day of Mo.i
,2010by
Lu\::; A. DliVCtveSj P.E.
Co.v'D\inq A , Pev0.
Notary's Name Printed, Stamped or Typed
Notary Seal: C~~
Personally Known:
x
or Produced Identification
Identification Produced N / A
\"'II~fI~",,
..wr."~
t(A~)~
'J,r.~~"
41f..ni,....
CAROUNAPENA
MY COMMISSION # DD 614972
EXPIRES: November 21,2010