Loading...
HomeMy WebLinkAboutKimlley-Horn - Orlando #6 Professional EngipeePng ServIces Ol\tot~A1J ...M_ ....,h_~._...,.'" ....-........,.... RFQ No. 10-04-01 prepared for: prepared by: ~=~ Kimley-Horn and Associates, Inc. OY300038.10 - _. -. ... -.--. - --. -'--~'--,:r- -.-- --~. u-- _.,.~-_..._.~--~- - ~:I .... lJ).. "'. ~ ] :l I :J ~ ~ Q ~ ~ Q o U ~ o ~ .......-l ~ ~ :J J :J - ..... "'- .9l_ "- - en- . - 6- <Xi- - - .. Professional Engipee.ring ServIces RFQ No. 10-04-01 Firm Overview .................................................... 1 · Financiallnformation Ability to Perform Scope of Services .............. 2 Proposed Person nel...... .............. ...................... 3 · Team Matrix · Staff Qualifications and Experience Similar Municipal Project Experience.............. 4 Required Forms and Backup Information ....... 5 · Wachovia Bank Relationship Letter · KHA Shareholder List · Projects Completed or in Process for Past Five Years · Proof of Authorization to Transact Business in Florida · Public Entity Crimes Statement · Non-Collusive Affidavit · Standard Form 330 RECEIVED MAY 2 6~J~_Z,~fM. CITY OF SUNNY ISLES BEACH OFFICE OF THE CITY CLERK Page 1 ~_ n Kimley-Horn ~_U and Associates, Inc. "p... ........../ .... ,,",,'-. Professional J3figinrering Services .. - 1.) Firm Overview KHA is a full-service, multidisciplinary consulting firm offering a broad range of engineering, planning, landscape architecture, and environmental services to public- and private-sector clients. Incorporated in 1967 in Raleigh, NC, KHA first became well known for its expertise in transportation planning and traffic engineering. In the early 1970s, the firm built an impressive track record in regional and urban area transportation planning, traffic impact analysis, parking planning and design, traffic control system design, and statewide and local traffic operations and safety studies. During this period, we also added practices in structural, highway, and bridge design, as well as airport planning and design. In 1983, KHA merged with Hutcheon Engineers of West Palm Beach, FL to enhance our general civil and surveying practices. Further diversification of our services and geographic practice followed over the years through staff hires and company acquisitions and mergers. Today, KHA has more than 1,500 employees in 55 offices throughout 15 states. Our offices are geographically grouped under six regions: Florida, Southeast, Mid-America, Mountain, Texas, and California. Florida comprises the firm's largest region, with nearly 400 employees in 17 offices. Financial State of Business We are financially strong, and we are committed to our continued financial health. We currently maintain a $10 million line of credit, which has not been accessed over the past three years. With the exception of a mortgage on a building and land in Florida, we currently have no external debt. In addition, we maintain average cash balances in the mid to high eight figure range. KHA's philosophy is to provide for our operating capital needs without relying on traditional, outside debt or equity, and over the past ten years plus, operating capital needs have been fully satisfied by operational cash flow. We maintain a disciplined focus on business fundamentals, operate the firm conservatively, and our internal controls and business standards are designed to keep our foundation strong. We accomplish this through a combination of practice diversity, strong client service, exceptionally talented staff, and a focus on our financial strength. As a privately-held corporation, KHA does not release detailed financial information in response to requests for proposals, which are in the public record. Upon selection, we would be glad to share details of our financial statements with your auditing staff on a need- to-know basis. In Section 5, Required Forms and Backup Information, we have included a letter of reference from Brent Gore, Senior Vice President and Relationship Manager at Wachovia Bank, N.A., where KHA holds its accounts. For more information about KHA's financial operations, please feel free to contact Dan Purvine, CPA, Vice President of Finance and Accounting in our Raleigh corporate headquarters at (919) 677-2000. Annual Revenue for the Past Two Years 2009: $350.6 million; 2008: $461.1 million. Names and Addresses of Persons Having Financial Interest in the Firm KHA is wholly owned by individuals that are KHA employees. At this time, only two people own five percent or more shares. They are Brooks H. Peed with 5.52% (445 24th Street, Suite 200, Vero Beach, FL 32960) and Mark S. Wilson with 6.05% (3001 Weston Parkway, Cary, NC 27513). Names of the remaining 280 shareholders can be found in Section 5, Required Forms and Backup Information. In the interest of brevity, we have omitted addresses for these individuals but can provide them at the City's request. OY3300038.10-0_Sunny Isles Beach Prof Eng Servs.indd Page 2 ~=~ Kimley-Horn and Associates. Inc. Professional :fJIigifiee-ring Services 2.) Ability to Perform Scope of Services The KHA team has extensive experience serving municipalities, counties, and governmental agencies. Our talented staff members offer a wide array of expertise to deliver dependable service with exceptional results. Listed below is an outline of our team's qualifications to provide specific disciplines identified in the City's Scope of Services. We can provide these services entirely in-house: traffic engineering; landscape architecture; environmental services; construction management/inspection/ testing; hurricane recovery and debris monitoring services; general design work; structural engineering; preparation of construction contract plans; public involvement; post design services; and bid administration. Traffic Engineering We offer complete traffic engineering services in-house. KHA has completed thousands of traffic engineering and operations projects, ranging from major area-wide signal systems involving hundreds of intersections to single intersection safety audits, designs, and analyses. Our firm is a national leader in the assessment of transportation impacts and the development of methodologies to continuously monitor development-generated traffic. Our traffic engineering staff includes experts in the following areas: . Signal system design . Accident analysis and testimony . Intersection design . Pedestrian safety programs . Signing and pavement marking studies and plans . Access management . Highway lighting plans . Parking studies and layout . Travel time and speed studies . Circulation studies . Safety and operations studies and plans . General traffic engineering consultation Our experience also includes numerous roadway design projects for which we have been responsible for traffic operations improvements such as signalization, signing and marking, and intersection design; Governor's highway safety studies; and the full range of related traffic engineering services that enable us to address any traffic operations situation. The number of critical intersections in Florida that the firm has evaluated or currently has under contract totals nearly 1,500. By analyzing and proposing alternative financing arrangements, KHA has assisted numerous local agencies in obtaining funding subsidies from the private sector for transportation improvement programs. In addition, our transportation planning staff lends a multi modal perspective to a broad range of transportation planning projects, applying effective and often innovative methods for ensuring public participation and support. Additional services that may also be beneficial to the City (depending on the individual project needs) include: . Long-range transportation planning/modeling . Site development and development of regional impact reviews . Environmental data collection and analysis . Preliminary right-of-way analysis . Preparation of comprehensive plan amendments . Level-of-service analyses . Mapping and graphics production . Noise data collection and analysis . Traffic calming . Bicycle/pedestrian facilities planning and design Landscape Architecture As metropolitan areas continue to grow, landscape architecture, urban design, and streetscape design have become integral components of roadway and transportation system designs and infrastructure improvements in general. Revitalizing commercial districts, controlling traffic flows, and providing recreational areas and pedestrian and bicycle facilities in increasingly congested areas are some of the solutions designed by our landscape architects and planners. We provide services in feasibility studies, master planning, design, permitting, public participation and consensus building, and construction administration. Our landscape architects and urban planners have extensive public- and private-sector experience, ranging from municipal streetscapes and road area improvements to multifamily residential developments. Our planners and landscape architects emphasize the development of a pleasing visual environment, meaningful theme, distinctive image, and strong sense of place, while being sensitive to your budget and long-term maintenance obligation. OY3300038.10-0_Sunny Isles Beach Prof Eng Servs.indd Page 3 ~-_n Kimley-Horn ~ U and Associates, Inc. Professional 'D~ '. · ,!rID.grnoonng. Services Environmental Services KHA maintains an experienced team of environmental scientists, geologists, hydrogeologists, biologists, and planners with wide-ranging experience in environmental planning services. Environmental services provided by our in-house professionals include: . Wetland jurisdictional evaluations, mitigation plans, and monitoring . Threatened and endangered species studies and coordination . Wildlife/habitat studies and mitigation planning . Contamination assessment/remediation for soils, groundwater, and surface water . Remedial planning, engineering design, and construction for cleanup of groundwater, surface water, soils, and waste materials . Comprehensive environmental compliance evaluations . Corridor evaluation and greenfields studies . Waste minimization/process optimization . Environmental permitting/documentation and regulatory agency coordination . Environmental audits (all phases) . Stormwater handling, treatment, and permitting . Water supply and distribution . Wastewater collection and treatment . Air quality and noise analysis . Aerial photo and geographic information system interpretation and mapping . Negotiation support, litigation support, and expert testimony . Land use and development feasibility studies . Hydrological and hydraulic analyses . Historical/archaeological/cultural resource assessments . Environmental assessments and impact statements Construction ManagemenUlnspection/Testing KHA offers complete construction observation and administrative services, including cost estimating, assisting in the bidding process, construction administration, reviewing monthly pay estimates, evaluating equipment delivered as compared to shop drawings, coordinating punch list observations, coordinating materials testing, and providing a full- or part-time construction observation representative. KHA provides construction phase services for many of our public- and private-sector development projects. Hurricane Recovery and Debris Monitoring Services KHA has the ability to offer hurricane preparedness and comprehensive disaster management and recovery services. We have a full staff of expert forensic engineers and analysts in West Palm Beach who have extensive experience assessing the damage to structures and facilities caused by wind, flooding, and a combination of storm forces. Services we provide include structural integrity assessment; emergency operation recommendations; preparation of detailed damage reports and repair estimates for use in collecting Federal Emergency Management Agency (FEMA) or insurance reimbursements; and emergency repair plans and specifications. KHA provided structural analyses for several municipalities before and after the hurricane seasons of 2004 and 2005. For example, we assisted South Martin Regional Utilities (SMRU) with their emergency response needs. Our in-house staff was on-site within hours of the storm and began assessing buildings and other utility-owned facilities. Our reports were instrumental in SMRU's ability to maximize both their FEMA and insurance reimbursements within a minimum amount of time. We were also asked by the Town of Jupiter Parks and Recreation Department to review all of the sports lighting facilities in the Town's Park system after the passing of the 2004 and 2005 hurricanes. The Parks Department's confidence in our abilities was demonstrated by their closing of the parks to public use until we were able to review the light poles and determine them to be safe. Our comprehensive review after Hurricane Jeanne in 2004 allowed the Town of Jupiter to save hundreds of thousands of dollars in pole replacement costs that were recommended by others during a previous review. General Design Work Civil engineering forms the backbone of our experience and qualifications to serve as the City's professional engineering consultant, and KHA has the in-house capabilities to provide you with any design need that may emerge. We have experienced professionals in utility design, transportation design, structural design, signal system design, roadway design, stormwater design, paving/drainage design, water and reclaimed water systems design, transit design, ITS design, lighting design, pedestrian/bicycle facilities design, and numerous other design services. Our multidisciplinary depth of design resources will provide the City with unmatched service. OY3300038.10-0_Sunny Isles Beach Prof Eng Servs.indd Page 4 ~_ n Kimley-Horn ~_ U and Associates. Inc. Professional En8fueering, Services Structural Engineering Structural engineering is often integral to full-service civil engineering, and our structural engineers are experienced in bridge design, warehouse and industrial facilities planning, stormwater and water management structures, as well as design for municipal facilities and transportation-related structures. KHA's structural staff has provided design services for a variety of different project types. Our engineers are very familiar with local, state, federal, and national design codes and requirements. Our staff is well versed in the design and analysis of concrete, steel, wood, and masonry structures. Services include, but are not limited to: traffic signal/light pole analysis; retaining wall and box culvert design; foundation design and analysis; and building/bridge design and rehabilitation. Collectively, our engineers have been responsible for the design of 700 bridges and inspection of more than 3,500 bridges, many of which have also included hydraulic analyses. With staff certified in both bridge inspection and scuba diving, we have logged hundreds of hours of underwater inspections. Preparation of Complete Construction Contract Plans/Special Provisions We invest significant energy during design and construction to help the construction process proceed smoothly. The first step in making the construction flow seamlessly is a well-conceived design, with a complete set of plans and specifications that gives the contractor thorough instructions. At KHA, we invest the extra effort during design to accomplish this goal. Often, we have been complimented by contractors on the completeness and clarity of our plans. A clear set of plans leads to fewer questions and problems, and ultimately, fewer change orders. We take pride in designing "buildable" plans, and our knowledge of construction issues and costs is evidenced by the firm's outstanding record of on-time and on-budget completions. Public Involvement Public support is important because it often determines overall design programs, funding strategies, implementation priorities, and ultimately the successful completion of projects. KHA is a statewide leader in public involvement and has received awards from the American Planning Association (APA) and the American Society of Landscape Architects (AS LA) for our work in this area. Our planners, engineers, and scientists have extensive experience in public involvement at both local and regional levels. We have conducted numerous public involvement activities ranging from PD&E studies to statewide plans. We are strongly committed to conducting public participation programs that educate, inform, and build consensus for a particular solution. Each project is different in terms of the stakeholders and the critical issues involved-thus, each public involvement program must be tailored to specifically address the project's needs. Our team can offer the following public involvement services: . Town Hall meetings . Stakeholder meetings . SmartBoard presentations . PowerPoint presentations . Workshop design and facilitation . Charrette design and facilitation . Media interviews . Innovative notification techniques (postcards, flyers, website announcements, email remainders, and press releases for television/radio) . Educational seminars . Extensive graphics support, including 3-D modeling Post Design Services An important and essential aspect of any project includes the administration, financial, and closing documentation portions of a project. These include but are not limited to bidding and award documentation, construction documentation and reporting, design and construction reports and associated documentation, billing and associated Requests for Reimbursements, and disadvantaged business enterprise documentation. Our team has an experienced and successful track record with each of these elements and can guide the City through these steps. In addition, KHA offers the services of full-time professional accounting and administrative staff to support our project team. Our accountants can provide accurate billings, Request for Reimbursement, and other administrative support and can provide quality control for these types of activities. Bid Administration Upon completion and approval of contract documents, our team is prepared to assist the City in the bidding and award of proposed improvements. KHA will prepare and can distribute bid documents on behalf of the City, provide contractor recommendations for prequalification of potential bidders, attend pre-bid conferences, review contractor bids and prepare bid tabulation, and provide contract award recommendations. Although our aim is to prepare a plan set that can stand by itself, we will respond to contractor requests for information and clarification in a timely manner. OY3300038.10-0_Sunny Isles Beach Prof Eng Servs.indd Page 5 11II"'1- n Kimley-Horn ~_ U and Associates. Inc. Professional Engineering, Services .....- --- 3.) Proposed Personnel The following team matrix identifies KHA's proposed key personnel to be assigned to the City's Professional Engineering Services contract and the specific in-house services they can each provide for your potential projects. Team Matrix Structural Engineering Environmental Services Traffic Engineering Landscape Architecture Construction Management Construction Inspection Construction Testing Hurricane Recovery and Debris Monitoring General Design Services Preparation of Construction V) Contract Plans and Special ~ Provisions Public Involvement Post Design Services Bid Administration rJ ~ rJ rJ rJ rJ ~ KJ ~ KJ KJ KJ ~ ~ ~ Staff Qualifications and Experience Adam Kerr, P.E. will serve as the City's project manager and main point of contact. In this role, Adam's prime responsibilities will be to ensure that all tasks are completed in both a creative and timely manner, that effective communication and collaboration are maintained throughout the process, and that project activities are properly executed and satisfactory to the City. Below we provide brief summaries of credentials, qualifications, and experience of our proposed team members who will serve the City on this contract. Relevant projects include: . General Traffic Services, Boca Raton, FL . General Traffic Services, Jupiter, FL · Traffic Signal Designs, Palm Beach County, FL . US 1 Corridor Modification Study, Delray Beach, FL . Traffic Concurrency Management Database and Report, Miami Lakes, FL Adam Kerr, P.E. - Project Manager; Traffic Engineering Professional Qualifications: Professional Engineer in Florida and Illinois Education: Bachelor of Science, Civil Engineering, Clemson University Years Experience: 8 Years with KHA: 8 Professional Associations: Institute of Transportation Engineers Experience: Adam is a transportation engineer experienced in a variety of transportation planning projects in South Florida. His experience includes preparation of major developments of regional impact (DRls), Florida Department of Transportation (FDOT) action plan analyses, data collection coordination, and computer modeling. He has prepared traffic studies, signal warrant analyses, and traffic signal designs throughout Palm Beach County and South Florida. He serves as the City Traffic Engineer for the City of Greenacres and provides traffic and planning consulting services for the City of Boca Raton. Adam has assisted the City of Sunny Isles Beach in preparing a signal warrant analysis and traffic signal design at an intersection along Collins Avenue. He also analyzed the site circulation and impacts of the proposed Heritage Park with regard to the local street network and Collins Avenue. Adam has served as a consultant to the Town of Jupiter, providing review of traffic studies, planning studies, and signal design expertise. He prepared the Bush Road Connector Study, which outlined traffic projections and alignment alternatives for a new roadway between Bush Road and Maplewood Drive. He is also designing a new traffic signal at the intersection of Toney Penna Drive and Pennock Lane. OY3300038.10-0_Sunny Isles Beach Prof Eng Servs.indd Page 6 ~=~ Kimley-Horn and Associates, Inc. Professional 'U:.' · ongineerIng Services . .,.- ---- Juan Jimenez, P.E. - Construction Management, Inspection, and Testing; General Design Seroices Professional Qualifications: Professional Engineer in Florida Education: Bachelor of Science, Civil Engineering, Florida International University Years Experience: 16 Years with KHA: 10 Professional Associations: American Society of Civil Engineers; Florida Engineering Society; National Society of Professional Engineers Additional Languages: Spanish Experience: Juan is a civil engineer experienced in municipal and utility engineering consulting in South Florida-mainly in Miami- Dade County. His broad project experience includes water supply and distribution, wastewater collection and transmission, stormwater management, roadway, general civil engineering, and land development. Juan brings technical analysis and design expertise, as well as sound project management experience in the preparation of work plans and schedules, permit documents, bid/contract documents, specifications, opinions of construction costs, and quality control. He also understands the importance of maintaining clear and constant communication with clients through all phases of the project. Relevant projects include: . NW 37 Avenue Water and Sewer Improvements, Miami-Dade County, FL . SR 710/Beeline Highway Design, Riviera Beach, FL . Lincoln Road Closure, Miami Beach, FL . Midtown Miami Brownfield Redevelopment, Miami, FL . Omni Development, Miami, FL Relevant projects include: . Midtown Miami Brownfield Redevelopment, Miami, FL . SR 71 O/Beeline Highway Design, Riviera Beach, FL . Sian Ocean Residences and Resort, Hollywood, FL . MET 2, Miami, FL . Grand Boulevard at Sandestin, Walton County, FL Michael Madsen, RLA - Landscape Architecture Professional Qualifications: Registered Landscape Architect in Florida Education: Master of Landscape Architecture, Landscape Architecture, University of Florida; Bachelor of Science, Business Administration, Florida State University Years Experience: 6 Years with KHA: 6 Professional Associations: American Society of Landscape Architects (ASLA); United States Green Building Council (USGBC); Miami-Dade County Urban Horticulture Committee Experience: Michael is a landscape architect experienced in master planning, streetscape design, site design, planting design, irrigation design, pool/amenity area design, and the preparation of tree mitigation plans. His background includes coordinating multidisciplinary design projects, such as landscape architecture, urban planning, architecture, civil engineering, roadway design, transportation design, and lighting design. He is skilled in AutoCAD 2007, LandFX, Adobe Photoshop, InDesign, and MicroStation. Kevin Schanen, P.E. - Hurricane Recovery and Debris Monitoring Seroices; General Design Seroices Professional Qualifications: Professional Engineer in Florida Education: Bachelor of Science, Civil Engineering, University of Florida Years Experience: 12 Years with KHA: 11 Professional Associations: Florida Engineering Society; National Society of Professional Engineers; American Society of Civil Engineers; American Water Works Association Experience: Kevin is a civil engineer with diverse engineering and project management experience. His background includes a wide variety of municipal projects, including water resources, structures, utilities, parks and recreation, restoration and rehabilitation, and infrastructure improvements. He currently serves as project manager for several other South Florida municipalities, including Palm Beach, West Palm Beach, Jupiter, Lantana, and Boynton Beach. OY3300038.10.0_Sunny Isles Beach Prof Eng Servs.indd Page 7 Relevant projects include: . South Martin Regional Utility (SMRU) Hurricane Recovery and Disaster Management/Recovery Services, Stuart, FL . . Marina and Dock Repairs and Rehabilitation, Palm Beach, FL . Worth Avenue Restoration Project, Palm Beach, FL . Old Boynton Road Utility Relocations, Boynton Beach, FL . D-2, D-8, D-9, D-10 Stormwater Basin Studies, Palm Beach, FL ~_ n Kimley-Horn III......J_U and Associates, Inc. Professional :Jffingineering Services -- - Rene Portieles, P.E. - Structural Engineering Professional Qualifications: Professional Engineer in Florida Education: Master of Science, Structural Engineering, University of Florida; Bachelor of Science, Civil and Environmental Engineering, Florida International University Years Experience: 9 Years with KHA: 9 Additional Languages: Spanish Experience: Rene's structural experience includes FDOT and Turnpike bridge design, pedestrian bridges, sound! noise walls, mast arms, bridge aesthetics, condominiums and hotel renovations, historic residents, bulkheads and marinas, sugar mills and refineries, warehouses, beach gazebos, timber structures, sheet piles, retaining walls, and box culverts. As a certified diver, he routinely dives to conduct site inspections, document wall and facility conditions, and prepare condition assessment reports. He has prepared plans and specifications, provided construction phase engineering inspections, and administered construction contracts. Relevant projects include: . Property Condition Assessments, Sunny Isles Beach, Miami, Kissimmee, and Weston, FL . Turnpike Widening from HEFT to Johnson Street PD&E Study and Design, Broward County, FL . Port of Miami Command and Control Center Design and Integration, Miami, FL . Harbor Branch Reverse Osmosis Water Treatment Plant, Fort Pierce, FL . Sugar Sand Park Design, Boca Raton, FL Relevant projects include: . Continuing Environmental Services, Plantation, FL . MDX Design Engineering for SR 874 from Kendall Drive to SR 826, Miami, FL . SFRTA Environmental Reviews . Ocean Sands, Indian River County, FL . Arlington Lakes, Naples, FL 4.) Similar Municipal Project Experience Since arriving in Florida more than 40 years ago, KHA has served and continues to serve municipalities and counties throughout the state on continuing professional engineering services contracts. The following examples of our similar municipal experience demonstrate our team's ability to provide the types of services required in the City's request for Professional Engineering Services. Lynn Kiefer, PWS - Environmental Seroices Professional Qualifications: Professional Wetland Scientist; U.S. Army Corps of Engineers Wetland Delineator Certified; Authorized Gopher Tortoise Agent; Hazardous Materials Health and Safety Certified; Wet II Training, FDOT; Certified Diver Education: Master of Science, Coastal Zone Management/Oceanography, Florida Institute of Technology; Bachelor of Science, Marine Biology, Auburn University Years Experience: 20 Years with KHA: 18 Professional Associations: Society of Wetland Scientists Experience: Lynn is a senior environmental scientist. She conducts natural resource and ecological evaluations for both public- and private-sector projects in freshwater ecosystems, marine ecosystems, and terrestrial habitats. She specializes in endangered and threatened species survey, coordination and habitat management, wetland permitting, and National Environmental Policy Act (NEPA) compliance (environmental impact statements, environmental assessments, categorical exclusions, and finding of no significant impact). Lynn has a strong working knowledge of all Florida ecosystems and the related issues associated with effects to these resources. She routinely works with the U.S. Army Corps of Engineers (USACE), the Florida Department of Environmental Protection (FDEP), FDOT, and various Florida water management districts. Continuing Consulting Seroices, Palm Beach, FL KHA provides a full range of on-call and project-related engineering services to the Town of Palm Beach in the areas of wastewater collection and transmission, stormwater pumping, stormwater collection, roadway improvements, water main improvement, marine facilities, parks and recreation, and future water supply. These services include project development, preparation of construction document, reports, and studies. KHA and its predecessor, Hutcheon Engineers, have been providing these services to the Town since 1955. Listed below are just a few of the projects we have recently completed or are currently working on for the Town of Palm Beach: . D-15 Pump Station Cooling System Rehabilitation . Worth Avenue Improvement Project . D-8 Stormwater Pumping Station and Collection System Piping . Par 3 Golf Course Renovation . D-2, D-9, D-10, D-8 Drainage Basin Study . Seaview Tennis Center OY3300038.10-0_Sunny Isles Beach Prof Eng Servs.indd Page 8 ~=~ Kimley-Horn and Associates. Inc. Professional ]i1;f1gUire-rlng Services . Town Forcemain System Study . Sanitary In-line Booster Pumping Station . Ocean Boulevard 20-lnch Forcemain Replacement . EI Vedado Road Utility Improvements . Marina and Docks Repair and Rehabilitation . Ibis Way and Island Road Bridge Rehabilitation . Fuel System Improvements . South Forcemain System Evaluation Continuing Consulting Senrices, Jupiter, FL KHA has served the Town of Jupiter under an ongoing services contract since 1972. During that time, we have literally completed hundreds of improvement projects and provided government leaders with sound, practical, and cost-effective advice in numerous areas. Our services have included traffic engineering, roadway and drainage improvement, water system improvements, development plan reviews, coastal engineering, park design, preliminary engineering and final design plans, utility relocations, bid coordination, construction contract administration, and numerous other services. Our work has involved the development of cost estimates, technical specifications, and permitting services through a regional water district, FDEP, and federal agencies. We also assisted the Town in obtaining Local Agency Planning designation and acquiring a $1 million ISTEA grant. Below we identify just a handful of projects that we have provided for the Town of Jupiter: . Residential Roadway Paving and Drainage Improvements . 12.0-MGD Reverse Osmosis Water Treatment Plant . 3.0-MG and 5.0-MG Ground Storage Water Tanks . Salinity Barrier on Outfall Canal . Hundreds of developer plan reviews . Master Drainage Plan . Water Supply Study . Bush Road Transportation Study . Restoration of Civic Center Building . Water System Modeling and Master Planning . Computerized Water System Atlas . Pedestrian Path Additions throughout the Town . Design of recreational facilities . Complex environmental permitting . Southern Loop Water Transmission Main Town Engineering Seroices, Miami Lalws, FL KHA has served the Town of Miami Lakes as its Town Engineer since 2007. Miami Lakes has contracted with our firm to provide all aspects of engineering associated with the Town, including providing staff to fill the positions of Public Works Director and Stormwater Utility Director. KHA's services have included traffic engineering, transportation planning, roadway design, drainage design, stormwater management, site planning, bid coordination services, landscape architecture, public involvement, construction administration, and more. With Miami Lakes' recent incorporation, they are in the process of obtaining the responsibility and ownership of the infrastructure within the Town limits. To assist with this effort, KHA is providing support in a wide range of areas to assess the conditions of the existing infrastructure. Specific projects for the Town of Miami Lakes have included: . NW 87th Avenue Design . Loch Ness Roadway and Drainage Improvements . Miami Lakeway North . Stormwater Master Plan and Stormwater Utility Report . Lake Elizabeth Drainage Improvements . Stormwater Master Plan Update . NW 154th Street Drainage Improvements . Concurrency System Development and Traffic Database Development General Engineering and General Traffic and Transportation Sen1ices, South Miami, FL KHA provided a variety of services for the City of South Miami. Projects ranged from downtown traffic analysis; roadway beautification along sections of US 1; intersection improvements (SW 64th Street and SW 59th Place, SW 74th Street and SW 59th Avenue- services included water main improvements, new asphalt, traffic calming elements to narrow the intersection by adding landscape medians, and construction phase services); design services for Murray Park; and north end drainage improvements (services included roadway miscellaneous drainage improvements and construction phase services). General Civil Engineering Consultant, Briny Breezes, FL KHA has served the Town of Briny Breezes under a general consulting agreement since 1993. Under this agreement, the firm has provided a variety of services, including stormwater master planning and improvements on Bay Drive; traffic studies; lift station rehabilitation; and rehabilitation of the Sanitary Sewer Inflow and Infiltration system. One of the more challenging projects was the creation of a master plan to rebuild the Town in the event of a catastrophic hurricane or other event. This FEMA-funded project took into account the prevailing utility, structural, and other requirements needed to successfully rebuild major components for the Town. OY3300038.10-0_Sunny Isles Beach Prof Eng Servs.indd Page 9 ~_ n Kimley-Horn ~_U and Associates, Inc. Professional Engineering Services _.- ~- General Civil Engineering Consultant, Bay Harbor Island, PL KHA provided general civil engineering consulting services for the Town of Bay Harbor Islands, including a forcemain study, a water quality parameters study, groundwater monitoring for underground fuel tank contamination, drawbridge master plan review, a town- wide drainage master plan, landscape architecture rehabilitation for the central business district, and consensus building for community enhancements associated with eminent roadway, drainage, and utility improvements. General Engineering Seroices, Plantation, PL KHA was selected as a general services consultant for the City of Plantation in 2002. We have worked closely with the City's Engineering Department on numerous roadway, drainage, and community enhancement projects, as well as traffic studies associated with the proposed improvements. Our services have included general planning to assist the City in developing cost-effective streetscape and beautification approaches and a traffic calming program. We have also assisted the City in implementing those visions with thorough, cost-effective roadway, traffic, lighting, landscaping, irrigation, and drainage designs, followed by construction phase services. As part of the community enhancement process, coordination with agencies such as FDOT, South Florida Water Management District, and Broward County was key to the overall success of the project. KHA has relationships in place with those and numerous other agencies to help streamline coordination efforts. Miscellaneous General Civil Engineering Seroices, Lauderhill, PL KHA worked with the City of Lauderhill on a series of roadway and drainage improvements projects. One of the primary projects under this contract involved improvements to Inverrary Boulevard, a main spine through the City. KHA provided master planning services for this section of roadway, including drainage improvements, design for the addition of bike lanes, striping, and meeting ADA compliance for sidewalks. We provided the City with suggestions to maximize the existing roadway and sidewalk to best accommodate the bike lane. Our design for the drainage improvements provided a more positive collection system to convey the excess stormwater runoff to the lake/canal system at a higher rate than the current swale system. KHA produced design and construction plans for the improvements to Inverrary Boulevard. General Consulting Sen1ices, Village of Palmetto Bay, PL KHA is currently working with the Village of Palmetto Bay as a general consultant to provide all types of engineering, such as planning, general civil engineering, and transportation. We are also developing a comprehensive plan as a foundation and framework for the new municipality. The Village has looked to KHA to develop a stormwater master plan and associated stormwater management plan to implement a stormwater utility and obtain ownership of the infrastructure. The stormwater master plan requires extensive research of the community's roadways, utilities, and drainage patterns to understand the condition of the infrastructure and stormwater management needs. As part of the plan, KHA has assisted the Village in developing a capital improvement program to prioritize improvements based on flood management needs and associated costs. In addition, KHA has helped the Village evaluate properties throughout the Village and develop associated utility rates to generate a dedicated revenue stream for the Village improvements. A critical part of the planning efforts has also been to assist the Village in joining the National Flood Insurance Program (NFIP). Joining the NFIP is required for the community to obtain federally funded flood insurance and be part of the Community Rating System to help reduce insurance rates for the community. The Village has also looked to KHA for specific civil and traffic engineering expertise to help them implement their new community vision. 5.) Required Forms and Backup Information Please refer to the subsequent pages for the following requested information: · Wachovia Bank Relationship Letter . KHA Shareholder List · Projects Completed or in Process for Past Five Years · Proof of Authorization to Transact Business in Florida . Public Entity Crimes Statement · Non-Collusive Affidavit . Standard Form 330 OY330003B.10.0_Sunny Isles Beach Prof Eng Servs.indd Page 10 ~=~ Kimley-Horn and Associates. Inc. Wachovia Bank. N.A. Commercial Banking NC3287 150 Fayetteville Street. Suite 600 Post Office Box 3008 Raleigh. NC 27602 II! -~~ ~~- ,\VACHOV-.1A January 8, 2010 Re: Kimley Horn and Associates, Inc. To \Vhom It May Concern: Kimley Horn and Associates, Inc. ("Kimley-Horn") has been a very satisfactory customer ofWachovia Bank, N.A., for over twenty years. The bank provides Kimley-Horn with deposit accounts, loans and other banking services that have been handled in a very satisfactory, responsible and professional manner. Kimley-Horn maintains deposit balances that have averaged a low to moderate eight figure in the last twelve months. Wachovia provides a revolving line of credit facility to Kimley-Horn. The line of credit is a low eight figure committed facility with no outstanding balance as of the date of this letter. Wachovia is very pleased with the Kimley-Horn banking relationship and hopes to provide banking services to the company in the future. If you have questions or would like additional infonnation, please contact me at 919-881-7022. Brent Senior resident & Relationship Manager Commercial Banking SHAREHOLDERS AS OF OS/20/10 I Stockholder Abbott, Frank G. Ackeret, Kenneth W. Adams, Richard C. Ahartz, Shannon R. Allen, David A. Atkins, John R. Atkinson, Mark E. Atz, John C. Bagby, III, T.J. Baldo, Burt L. Barber, Barry L. Bardt, David R. Barkley, Robert W. Barlow, Matthew T. Barnes, R. Russell Barr, Richard R. Barrett, Laura E. Benditz, John F. Bishop, Mark C. Bishop, Peter A. Blakley, Jr., Stephen W. Breton, Ramon F. Buchler, Aaron E. Burchett, Jr., Thomas F. Burgess, Lisa M. Buritica, Tricia L. Burkett, L. Frederick Burns, Gregory B. Busche, Richard V. Byrd, Michael N. Callaway, Gail M. Campbell, David C. Carey, Lyndon M. Carroll, Randy W. Carter, Kevin F. Cary, William R. Cash, Miandra F. Castillo, Jason W. Cave, Derrick B. Chambers, Jon S. Chavers, J. Todd Cherry, Paul L. Percentage I 0.55% 0.85% 0.23% 0.03% 0.04% 0.03% 0.93% 2.98% 1.27% 0.22% 1.84% 0.44% 0.16% 0.08% 1.24% 0.59% 0.47% 0.91% 0.18% 0.79% 0.62% 0.08% 0.13% 1.16% 0.15% 0.29% 0.05% 1.69% 0.13% 1.84% 0.22% 0.51% 0.02% 0.04% 0.16% 0.01% 0.04% 0.12% 0.69% 0.07% 0.91% 0.38% ~=~ Kimley-Horn and Associates, Inc. Christian, Brent L. Ciandella, Serine A. Clift, Dennis R. Cochran, Adam P. Colety, Michael D. Collins, James F. Collins, Jon M. Conrad, John R. Cook, Richard N. Cooper, Kurt D. Coppin, Thomas G. Daisa, James M. Danielson, Paul B. Davidson, Lori S. Davis, Michael A. Deans, Neil T. Delmarter, Michael L. Demeter, E. Christopher DeMotte, Michael G. Devera, GiI C. DeWitt, Timothy L. DeZee, Carl T. Dierks, Kenneth A. Doyle, Martha G. Drost, Kirk F. Dunzo, Mark W. Durrenberger, Randal R. Dvorak, Jr., William E. Ehret, Gary A. Eichinger, Robert A. Eklund, Julie K. Ellis, Nicholas L. Fairchild, Angelina G. Fanney, Lawson H. Fares, George B. Fares, Jean B. Farnan, Thomas W. Feldman, Marcia A. Fink, Kenneth L. Flowers, Larry L. Ford, Jon C. Foster, Scott J. Fowler, Thomas M. France, William D. SHAREHOLDERS AS OF OS/20/10 1.69% 0.22% 0.11% 0.06% 0.19% 0.23% 0.02% 0.88% 0.65% 1.13% 0.07% 0.01% 0.12% 0.05% 0.03% 0.56% 0.26% 0.18% 0.06% 0.04% 0.14% 0.02% 0.09% 0.07% 0.13% 0.30% 0.14% 0.27% 0.13% 0.09% 0.12% 1.39% 0.13% 0.03% 0.74% 0.21% 0.30% 0.04% 0.15% 0.07% 0.10% 0.17% 0.14% 0.03% ~=~ Kimley-Horn and Associates, Inc. SHAREHOLDERS AS OF OS/20/10 Frysinger, Ashley M. Frysinger, Chris V. Gary, Glenn A. Gaskey, Kevin S. Geer, Charles L. Gillis, Brian R. Goldman, David S. Good, Brian A. Gottholm, Michael J. Grant, Dan F. Guillory, M. Brandon Hachem, Stephanie L. Hackney, Louis A. Haines, David S. Hale, Mikal R. Hall, James R. Haney, Stephen E. Harris, Jessica L. Harry, Jennifer L. Hart, Patrick B. Hatchel, Mark C. Hatton, Christopher C. Hedayat, Leyla Heggen, Christopher W. Henigsman, Dean A. Heracklis, Omer Hermann, Michael J. Hewitt, Melissa A. Hildebrand, Ronald C. Horn, Jon B. Horn, R. Michael Hume, Robert M. Jackson, Jay R. Jackson, Kenneth W. James, R. Jeffery Jucksch, Rebecca R. Kaltsas, Joseph D. Karr, Russell L. Kerry, Nicole M. Kiefer, Jr., Michael E. Kiefer, Louisalynn B. Kilby, Jon M. Kissinger, John C. Krieger, Keith T. 0.06% 0.25% 0.58% 1.34% 1.72% 0.04% 0.12% 0.21% 0.12% 0.07% 0.03% 0.24% 0.02% 0.06% 0.02% 0.78% 0.07% 0.04% 0.04% 0.13% 0.08% 0.50% 0.05% 0.08% 0.85% 0.04% 0.17% 0.09% 0.02% 0.13% 1.35% 0.19% 0.62% 0.64% 0.43% 0.03% 0.07% 0.08% 0.26% 0.38% 0.23% 0.04% 0.17% 0.39% ~=~ Kimley-Horn and Associates, Inc. Kyle, Gregory S. Landaal, Dennis J. Lefton, Steven E. Leistiko, David J. Long, Jamea M. Lott, J. Samuel Lovejoy, Eric C. Mackey, Jr., William F. Maio, Alan Manning, D. Mark Marchand, Jean P. Marin, Laura S. Markland, Keith R. Marscheider, Edward A. Martin, Jonathan A. Martin, R. John Massey, Amy B. Matson, Jason B. McEntee, David L. McGreger, Amy L. McPherson, Karen C. McWilliams, John J. Meador, Emily H. Mecca, Joseph P. Mecca, Michelle B. Melvin, Enda Michot, Brian J. Miller, Edward W. Miller, Mark D. Millner, Daniel C. Mingonet, M. Scott Moles, Richard A. Montanye, Emmeline F. Moore, Jeffrey W. Moore, Matthew A. Moore, Richard H. Morris, David W. Morris, John J. Morrison, Russell C. Morton, Arthur J. Mufleh, Marwan H. Mullis, Jeffery Mullis, R. Michael Muntean, David SHAREHOLDERS AS OF OS/20/10 0.09% 0.25% 0.67% 0.17% 0.01% 0.36% 0.02% 0.11% 0.63% 0.17% 0.21% 0.02% 0.07% 0.04% 0.17% 0.35% 0.04% 0.25% 0.02% 0.08% 0.21% 0.01% 0.04% 0.10% 0.18% 0.72% 0.03% 0.03% 0.22% 0.09% 0.25% 0.04% 0.07% 0.11% 0.02% 0.13% 0.02% 0.11% 0.30% 0.02% 0.11% 0.65% 0.07% 0.02% ~=~ Kimley-Horn and Associates, Inc. Murphy, Terence T. Musarra, Salvatore J. Mutti, Brent H. Narron, Cecil L. Nash, William A. Nathan, Aaron W. Nejad, Anush A. Newton, Gary T. Noon, Lisa K. Noonkester, Matthew D. Norby, Michael A. Nuckols, Charles A. Omais, Ahmad A. Orr, Stephen O. Osborne, David J. Paquet, Dean L. Parker, Brian J. Peed, Brooks H. Pelan, Keith A. Penny,H.Dean Perillo, Adam C. Perkins, David D. Phelps, Kevin D. Phelps, Randall J. Pires, Alexander W. Pretorius, Petrus S. Privette, Stephanie B. Purtle, Vicki L. Purvine, Daniel L. Rapp, Bryan T. Ratay, Gary R. Reed, Elizabeth A. Reeder, Steven H. Repetti, Leo J. Rhodes, Christopher D. Roberson, Kevin M. Robinson, L. Daniel Rohrbaugh, Richard R. Ross, Michael S. Ross, Robert A. Rowe, Curtis D. Royal, J. Randall Rushing, Michael L. Rutkowski, Michael M. SHAREHOLDERS AS OF OS/20/10 1.49% 0.06% 0.12% 0.48% 0.76% 0.04% 0.73% 0.08% 0.10% 0.02% 0.18% 0.39% 0.71% 0.20% 0.24% 0.04% 0.07% 5.52% 0.29% 1.16% 0.07% 0.40% 0.03% 0.03% 0.08% 0.67% 0.01% 0.21% 0.13% 0.45% 0.11% 0.19% 0.07% 0.03% 0.05% 0.22% 0.08% 1.09% 0.17% 0.04% 0.08% 0.03% 0.15% 0.07% ~=~ Kimley-Horn and Associates, Inc. Sauro, Thomas J. Saxena, K. K. Schanen, Kevin M. Schiller, Michael G. Schilling, William J. Schmid, Seth E. Schmitt, Michael L. Schulte, Kurt J. Schwartz, Frederick W. Seal, Dennis K. Serbiak, Michael T. Sewell, Jon S. Shamburger, C. Brian Shewski, Brian K. Sims, David A. Sorenson, David K. Sowers, Brian E. Spinks, Charles R. Spruce, Michael D. Squires, Christopher A. Stansbery, Stephen M. Stebbins, Sam S. Stewart, David W. Stewart, Lisa S. Stocks, Karin S. Stovall, Thomas M. Stricklin, Jr., David L. Strychalski, Raymond P. Sulkowski, Nicholas E. Sumislaski, James M. Sutter, Karl V. Swindler, Roderick P. Tate, Jr., S. Clifton Tatum, Jenifer R. Tewksbury, Carl F. Thigpen, Jonathan D. Tribble, Guy B. Truex, Terry M. Truman, Stephen P. Van Buskirk, Peter T. Van Leeuwen, Andrew W. Van Riper, Kent L. VanRens, Peter J. Vitter, James G. SHAREHOLDERS AS OF OS/20/10 0.11% 0.90% 0.02% 1. 73% 0.22% 0.02% 0.13% 0.13% 0.86% 0.04% 0.04% 0.09% 0.17% 0.40% 0.06% 0.26% 0.16% 0.21% 0.10% 2.39% 0.04% 0.97% 1.61% 0.02% 0.05% 0.45% 0.11% 0.02% 0.12% 0.42% 0.09% 0.89% 0.31% 0.03% 0.17% 0.17% 0.67% 0.29% 0.12% 0.18% 0.39% 0.39% 0.11% 0.00% ~=~ Kimley-Horn and Associates, Inc. SHAREHOLDERS AS OF OS/20/10 Voisin, William J. Waddill, William D. Walker, John D. Wallace, Gary W. Walnum, Nathan C. Walsh, Christopher J. Webb, F. Cole West, Brian B. West, James E. White, Tove C. Whyte, Richard D. Wilczek, Erik J. Wilfong, Gregory D. Wilhelm, William R. Wilson, David D. Wilson, Deborah L. Wilson, Jon E. Wilson, Mark E. Wilson, Mark S. Woodward, David T. 1.10% 0.42% 0.27% 1.28% 0.06% 0.01% 0.08% 0.17% 0.14% 0.04% 0.02% 0.08% 0.02% 0.11% 0.07% 1.23% 0.97% 0.29% 6.05% 0.05% ~=~ Kimley-Horn and Associates, Inc. Projects Completed or in Process for Past Five Years KHA has 55 offices nationwide and more than 1,500 employees. To provide a list of all firm-wide projects currently under contract or completed in the past five years would encompass numerous pages. Therefore, in the interest of brevity and relevance, we have provided a list of major projects currently being performed or completed in the past five years by our proposed team members, along with corresponding client references. Benjamin School Signal Design, Palm Beach Gardens, FL Reference: The Benjamin School; Jim Adle; (561) 472-5998 Callery-Judge Grove Mixed-Use Development of Regional Impact, Palm Beach County, FL Reference: Callery-Judge Grove; Not Roberts; (561) 793-1676 Concurrency Management Development, Miami Lakes, FL Reference: City of Miami Lakes; Matt Barnes; (305) 364-6100 D-2, D-8, D-9, D-10 Stormwater Basin Studies, Palm Beach, FL Reference: Town of Palm Beach; Jim Bowser; (561) 838-5440 Flagler Memorial Bridge PD&E Study, Palm Beach County, FL Reference: FOOT District Four; Joshua Salazar, P.E.; (954) 777-4635 Inlet Village Concept Master Plan - AlA Corridor, Jupiter, FL Reference: Town of Jupiter; Brenda Arnold; (561) 746-5134 Marina and Dock Repairs and Rehabilitation, Palm Beach, FL Reference: Town of Palm Beach; Jim Bowser; (561) 838-5440 Midtown Miami Brownfield Redevelopment, Miami, FL Reference: Sobay Partners, LLC; Bruce Cutright; (561) 232-0775 NW 37th Avenue Water and Sewer Improvements, Miami-Dade County, FL Reference: Miami-Dade Water and Sewer Department, Reynaldo Abreu; (786) 552-8161 Office Depot Headquarter Signal Design, Boca Raton, FL Reference: Flagler Development; Rick Pugatch; (305) 520-2300 Old Boynton Road Utility Relocations, Boynton Beach, FL Reference: City of Boynton Beach; Chris Roschek; (561) 742-6413 Phase I Environmental Site Assessments - Multiple Sites, Indian River County, FL Reference: Floridaffinity; Charles Hardee, III, Esquire; (850) 222-8518 Pompano Beach Airpark Environmental Assessment for Extension of Runway 13-33, Pompano Beach, FL Reference: Pompano Beach Airpark; Steve Rocco; (954) 786-4135 11"'1-_ n Kimley-Horn IlI.J U and Associates, Inc. Port St. Lucie Ctvic Center, Parking Garage, and City Plaza, Port St. lucie, Fl Reference: City of Port St. Lucie Community Redevelopment Agency; Greg Oravec; (772) 344-4371 Preliminary Engineering for the Blue line lRT Stations (Barrio logan to San Ysidro), San Diego, CA Reference: SANDAG; John Haggerty; (619) 699-6937 Seaview Tennis Center, Palm Beach, Fl Reference: Town of Palm Beach; Charles Langley, P.E.; (561) 838-5440 Sian Ocean Residences and Resort, Hollywood, Fl Reference: MCZ/Centrum Citrus Farms, LLC; Bromley Kelly; (954) 778-7234 South Martin Regional Utility (SMRU) Hurricane Recovery and Disaster Management/Recovery Services, Stuart, Fl Reference: SMRU; Gene Rauth; (772) 545-4254 Sports lighting Structural Reviews, Jupiter, Fl Reference: Town of Jupiter; Russ Ruskay; (561) 746-5134 SR 710/Beeline Highway Design (East and West), Riviera Beach, Fl Reference: FOOT District Four; John Thompson, P.E.; (954) 777-4680 US 1 Corridor Modification Study, Delray Beach, Fl Reference: City of Delray Beach; Randal Krejcarek, P.E.; (561) 243-7322) Worth Avenue Restoration Project, Palm Beach, Fl Reference: Town of Palm Beach; Tom Bradford; (561) 838-5410; or Eric Brown; (561) 838-5440 ~=~ Kimley-Horn and Associates, Inc. State of Florida Department of State I certify from the records of this office that KIMLEY-HORN AND ASSOCIATES, INC. is a corporation organized under the laws of North Carolina, authorized to transact business in the State of Florida, qualified on April 24, 1968. The document nUlnber of this corporation is 821359. I further certify that said corporation has paid all fees due this office through Decelnber 31, 2009, that its most recent annual report was filed on April 30, 2009, and its status is active. I further certify that said corporation has not filed a Certificate of Withdrawal. Given under my hand and the Great Seal of Florida, at Tallahassee, the Capital, this the Third day of May, 2009 ~.'-6 Secretary of State Authcntication 10: 500 t 54549 t 65-050309-82 t 359 To authcnticatc this ccrtificate.visit thc following sitc. cntcr this 10. and thcn follow the instructions displayed. - h ttpS:/ / eme.S u n b iz.org/ certa u thver.h tml ~tat~!,~'l{lnriaCl Board of 1t~!~~~~~Mt~ngineers Klmley\~~!:.~s~~~es. Inc. Is authorized under the provisions of seCit~11~~~a Statutes, to offer engineering services to the public through a Professional Engi~egf:~~Y.1{~Sed under Chapter 471, Florida Statutes. expiration: 28.Feb-11 Audit No: 22820112098 Certificate of Authorization CANo: 696 DISPLAY AS REQUIRED BY LAW AU 4733767 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF LANDSCAPE ARCHITECTURE SEQ# L09112401B17 : . LICENSE NBR 11 24 2009 097033317 LCC000219 The LANDSCAPE ARCHITECT BUSINESS Named below HAS REGISTERED Under the provisions of Chapter 481 FS. Expiration date: NOV 30, 2011 KIMLEY-HORN AND ASSOCIATES INC POBOX 33068 RALEIGH NC 276363068 CHARLIE CRIST GOVERNOR , DISPLAY AS REQUIRED BY LAW CHARLES W. DRAGO SECRETARY AC# 3 S R 1 S 00 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL GEOLOGISTS SEQ# LOB072903159 __:J'~(ol:.IIIII.1:I:t;~LICENSE NBR ~80063729 JGB175 The GEOLOGY BUSINESS Named below IS CERTIFIED Under the provisions of Chapter 492 FS. Expiration date: JUL 31, 2010 KIMLEY-HORN AND ASSOCIATES INC PO BOX 33068 RALEIGH NC 27636 CHARLIE CRIST GOVERNOR DISPLAY AS REQUIRED BY LAW CHUCK DRAGO INTERIM SECRETARY SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to City of Sunny Isles Beach by Hao T. Cha u , P. E . fur Kimley-Horn and Associates, Inc. whose business address is 4431 Embarcadero Drive, West Palm Beach, FL 33407 and (if applicable) its Federal Employer Identification Number (FEIN) is 56- 0885615 (IF the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: 2. 1 understand that a "public entity crime" as defined in Paragraph 287. 133(l)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287 .133(l)(b), Florida Statutes means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry of a plea of guilty or nolo contenders. 4. I understand that an "affiliate" as defined in Paragraph 287. 133(l)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity come. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(l)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 6. Based on information and belief, the statement which I have marked below is true in a relation to the entity submitting this sworn statement. (Please indicate which one (I) of the following three (3) statements is applicable.) ~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(2) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(3) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or agents who are active in management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. However, there has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attached is a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. ~ -lJR:E OF AFFIANT Hao T. Chau (Printed or Typed Legal Name of Affiant) State of Florida County of Orange Sworn to and subscribed before me this 25th day of May ,2010 by Hao T. Chau ~W)..... ct.. ~ Marcia A. Cornelison Notary's Name Printed, Stamped or Typed al: Personally Known: X or Produced Identification ~y~"" . ~~l'"<f, Notary Public State of Florida . . Marcia A Cornelison '\ ~; My CommiSSIon 00904606 01 f\.df Expires 09/11/2013 Identification Produced NON-COLLUSIVE AFFIDA VIT State of Florida) County of Orange ) Hao Chau, P.E. and says that: (1) ~he is the (Owner, Partner, Officer,~resenta~r Agent) of the Bidder that has submitt~e attached Bid; being first duly sworn, deposes (2) ~he is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; (3) Such Bid is genuine and is not a collusive or sham Bid; (4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a collusive or sham Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work; (5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or parties in interest, including this ~ft :r-BRE-OF AFFIANT Hao T. Chau (Printed or Typed Legal Name of Affiant) State of Florida County of Orange Sworn to and subscribed before me this 25th day of May ,20l0by Hao T. Chau ~~Cl. ~ Marcia A. Cornelison Notary's Name Printed, Stamped or Typed ~y~~ Notary Seal: .R~ '1-. Notary Public State of Florida Marcia A Cornelison ~ ~ ~ My CommiSSIOn 00904606 ~o, f\."" Expires 09/11/2013 Personally Known: x or Produced Identification Identification Produced ARCHITECT - ENGINEER QUALIFICATIONS PART 1- CONTRACT SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (eityand State) Professional Engineering Services for City of Sunny Isles Beach 2. PUBLIC NOTICE DATE 13. SOLICITATION OR PROJECT NUMBER RFQ NO.1 0-04-01 B. ARCHITECT - ENGINEER POINT OF CONTACT 4. NAME AND TITLE Adam Kerr, P.E., Transportation Engineer 5. NAME OF FIRM Kimley-Horn and Associates, Inc. 6. TELEPHONE NUMBER I 7. FAX NUMBER 18. E-MAIL ADDRESS 561-845-0665 561-86-8175 Adam .Kerr@kimley-horn.com C. PROPOSED TEAM (Complete this section for the Drime contractor and all kev subcontractorsJ (Check) cr 'cr w w Zo 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT :2 >Z Of- oc 'f- Uu -'cr ~C2 Cl. <l: Cl. enf- Kimley-Horn and Associates, Inc. 4431 Embarcadero Drive Project management, traffic a. X West Palm Beach, FL 33407 engineering, hurricane recovery and debris [Xl CHECK IF BRANCH OFFICE monitoring, general design services Kimley-Horn and Associates, Inc. 1691 Michigan Avenue Construction managemenU b. X Suite 400 inspection/testing, general Miami Beach, FL 33139 design services, landscape [Xl CHECK IF BRANCH OFFICE architecture Kimley-Horn and Associates, Inc. 445 24th Street Environmental services c. X Suite 200 Vero Beach, FL 32960 [Xl CHECK IF BRANCH OFFICE d. [ 1 CHECK IF BRANCH OFFICE e. [ 1 CHECK IF BRANCH OFFICE f. [ 1 CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM [ X l (Attached) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) ~=~ Kimley-Horn and Associates, Inc. TEAM MATRIX Structural Engineering Environmental Services ~ Traffic Engineering ~ Landscape Architecture ~ Construction Management ~ Construction Inspection ~ Construction Testing ~ Hurricane Recovery and ~ Debris Monitoring General Design Services ~ ~ Preparation of Construction ~ ~ ~ ~ ~ ~ Contract Plans and Special Provisions Public Involvement ~ ~ ~ ~ ~ ~ Post Design Services ~ ~ ~ ~ ~ ~ Bid Administration ~ ~ ~ ~ ~ ~ ~=~ Kimley-Horn and Associates, Inc. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Adam Kerr, P.E. Project Manager, Traffic Engineering a. TOTAL I b. ~ITH CURRENT FIRM 8 15. FIRM NAME AND LOCATION (City and State) Kimley-Horn and Associates, Inc., West Palm Beach, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 117. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) Bachelor of Science/Civil Engineering/Clemson University FL/P.E./64773 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Institute of Transportation Engineers 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Town Engineering Services PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Miami Lakes, FL (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm a. As part of our engineering services contract with the Town of Miami Lakes, the Kimley-Horn team prepared a traffic concurrency management database and report. Created and maintained a database to inventory the existing and allowable traffic within the Town of Miami Lakes. Assisted in developing a methodology for determining traffic concurrency in the Town. This project is ongoing; firm fee: $130,000 (average annual fee). (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED General Traffic Services PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Boca Raton, FL (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm b. Prepared reviews and comments of traffic studies and site plans as part of the City's development review process. Represented City Staff at developer meetings and public hearings. Worked with Signal Department Staff to update record drawings and provide general signal design services. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED General Traffic Services PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Jupiter, FL (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm c. As project manager was responsible for the preparation of reviews and comments of traffic studies and site plans as part of the City's development review process. Performed a study to determine the effects of adding the Bush Road Connector. Prepared signal design plans and specifications package for the traffic signal at Toney Penna Drive and Pennock Lane. This project is ongoing; firm fee (to date): $19,753. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED US 1 Corridor Modification Study PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Delray Beach, FL 2007 (3) BRIEF DESCRIPTION (Briefscope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm d. Prepared an analysis of conditions prior to and after a lane reduction on a major corridor through Delray Beach, Florida. Aspects of the study included traffic volumes at intersections and generally along the corridor, speeds, and accident data. The corridor study was part of a larger project which analyzed the qualitative effects of decreased number of travel lanes, increased sidewalk width, and increased landscaping. The project involved extensive public coordination with the City of Delray Beach, the Florida Department of Transportation, and the Delray Beach Community Redevelopment Association. Firm fee: $200,000. (1) TITLE AND LOCATION (Ci/yand State) (2) YEAR COMPLETED Various Traffic Signal Designs PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Palm Beach County, FL (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm Prepared plan sets and opinions of probable cost for several private-sector developers. Coordinated the structural analysis, e. geotechnical analysis, and the permit and approval processes. Designs were on major thoroughfares and required agency approval from Florida Department of Transportation, Palm Beach County, municipalities, and various utility companies. Provided construction phase services for several signals. New signals designed and constructed include: Central Boulevard and Grandiflora Road (The Benjamin School); Northlake Boulevard and Christ Fellowship Church Main Entrance; Gateway Boulevard and Renaissance Commons Boulevard; Congress Avenue and Water Tower Road; Toney Penna Drive and Pennock Lane; Military Trail and Office Depot Headquarters Entrance; and SR 7/US 441 and Pioneer Road. Fee varies per project. STANDARD FORM 330 (1/2004) ~-_n Kimley-Hom ~ U and Associates, Inc. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT rCamDlete ane Sectian E far each key Dersan. ) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Juan Jimenez, P.E. Construction ManagemenUlnspection/T esting, a. TOTAL I b. WITH CURRENT FIRM General Desiqn Services 16 10 15. FIRM NAME AND LOCATION (City and State) Kimley-Horn and Associates, Inc., Miami Beach, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) \17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND Bachelor of Science/Civil Engineering/Florida International University DISCIPLINE) FUP.E.l56704 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc.) American Societv of Civil Enaineers Florida Enqineerina Societv National Societv of Professional Enqineers 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED NW 37 Avenue Water and Sewer Improvements PROFESSIONAL SERVICES T CONSTRUCTION (tf Applicable) Miami-Dade County, FL 2007 (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm This project is part of the Miami-Dade Water and Sewer Department's (MDWASD) "Needs Assessment Program" (NAP), and a. consisted of the preparation of a technical memorandum to evaluate alternatives and recommend improvements within a 2,000- acre area of unincorporated Miami-Dade County that had little or no existing water and sewer infrastructure in order to improve the capacity of the existing system and sustain future economic redevelopment within the area. Additionally, even though the project area is within unincorporated Miami-Dade County, portions of it receive water service via water mains owned and operated by the adjacent City of Hialeah. Part of our services included developing a plan to disconnect services from the City of Hialeah and reconnect them to the County's water distribution system. Firm fee: $570,000; total project cost: $9.5 million (est). (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 710/Beeline Highway Design PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) FOOT District Four 2007 (design) 2009 (Phase 1)* (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm b. Served as project engineer for this roadway project in the City of Riviera Beach. The combined length of both projects is 5.33 miles. The western project consists of the addition of two new lanes to provide a four-lane divided rural roadway, along with the replacement of the existing two-lane bridge and the construction of a new two-lane parallel bridge. The eastern project consists of the new construction to provide a four-lane divided urban roadway. *Phases 2 and 3 are ongoing; firm fee: $3.2 million; total project cost (for Phases 1, 2, and 3): $29 million. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Lincoln Road Closure PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Miami Beach, FL 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm c. Serving as civil engineer. This project is a joint-venture between the City of Miami Beach and UIA Management, LLC. The 1000-1100 Block of Lincoln Road has been closed to vehicular traffic to allow for the extension of the Lincoln Road Pedestrian Mall. The mall is being extended west, from Lenox Avenue to Alton Road, and will include a new pedestrian plaza. The design also includes four water gardens, and streetscape and infrastructure improvements. Kimley-Horn is providing due diligence, civil engineering, landscape architecture, permitting, traffic signal modifications, and lighting and electrical design services for this project. This project is ongoing; firm fee: $363,658. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Midtown Miami Brownfield Redevelopment PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Miami, FL 2007 (3) BRIEF DESCRIPTION (Briefscope, size. cost. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Served as project engineer for the "Shops at Midtown Miami," the largest urban infill redevelopment project in Miami-Dade County. The project is located on 56-acre Brownfield site previously owned by the FEC Railroad and involved planning, design, and construction of d. all public and private infrastructure to serve 3,500 residential units, 800,000 square feet of commercial, and 15,000 square feet of office space. Some of the major infrastructure components included FPL and telecommunications duct banks, storm drainage wells, traffic signals and roadways, and a street car system. Infrastructure also included 12,500 linear feet of new 12-inch water distribution mains and 6,500t linear feet of new 8-inch to 20-inch sanitary sewer mains. Kimley-Horn designed water and sewer service connections for future parcel developments. Served as District Engineer for the Midtown Miami Community Development District. The project consisted of 14 development blocks, which required extensive coordination with multiple developers, design professionals, and contractors. The project was within the jurisdiction of the City of Miami, Miami-Dade County, FDOT, Miami-Dade DERM, FDEP, and the Miami-Dade Water and Sewer Department (and also required coordination and approvals from these agencies). Firm fee: $3.5 million; total project cost: $650 million. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Omni Development PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Miami, FL (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm e. Serving as project engineer. With six high-rise residential towers offering 4,200 dwelling units and 350,000 square feet of retail space, the 11.3-acre, mixed-use Omni Development will reinvigorate the area. Responsibilities included due diligence level services during pre-development, as well as the preparation of a report on findings. A schedule of anticipated fees for the project was also compiled. Firm fee: $105,000; total project cost: $8.5 million. The project is currently on hold. STANDARD FORM 330 (1/2004) ~-n Kimley-Horn IIII......J_ U and Associates, Inc. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Michael Madsen, RLA Landscape Architecture a. TOTAL I b. ~ITH CURRENT FIRM 6 15. FIRM NAME AND LOCATION (City and State) Kimley-Horn and Associates, Inc., Miami Beach, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) Bachelor of Science/Business Administration/Florida State University FL/RLA/LA6666994 Master of Landscape Architecture/Landscape Architecture/University of Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, etc.) American Society of Landscape Architects (AS LA) Florida Chapter ASLA Conference co-chair ASLA Miami-Dade/Monroe County Section Chair ASLA National Student Representative Past President, University of Florida ASLA Student Chapter LABASH 2004 PR/Marketing Committee Chair United States Green Buildina Council (USGBC) Miami-Dade County Urban Horticulture Committee 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED MET2 PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Miami, FL (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm a. Served as landscape architect on the design team for this project composed of a class A office building and five-star hotel connected by a parking structure with a pool deck on top. The 48-story office building is a uniquely sculpted design destined to be a main point of interest in the downtown revitalization effort. The hotel building will have 360 guestrooms that spread out over 20 floors. Urban Resource Group was involved in this project from its inception, dealing with the very challenging urban redevelopment site with many constraints. This project is ongoing; total project cost: $330,000; construction cost: $330 million. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 710/Beeline Highway Design PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) FOOT District Four 2007* (design) 2009 (Phase 1)* (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm b. Provided landscape and irrigation services for this project in the City of Riviera Beach. The combined length of both projects is 5.33 miles. The western project consists of the addition of two new lanes to provide a four-lane divided rural roadway, along with the replacement of the existing two-lane bridge and the construction of a new two-lane parallel bridge. The eastern project consists of the new construction to provide a four-lane divided urban roadway. *Phases 2 and 3 are ongoing; firm fee: $3.2 million; total project cost (for Phases 1, 2, and 3): $29 million. (1) TITLE AND LOCATION (eityandState) (2) YEAR COMPLETED Sian Ocean Residences and Resort PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Hollywood, FL 2008 c. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm Sian is a hotel/condo redevelopment project spanning from Hollywood Beach to the Intracoastal Waterway. As a landscape architect, designed plantings, hardscape, lighting and irrigation plans, and worked closely with the developer and civil engineering team to coordinate drainage issues and necessary permitting. Firm fee: $800,000; total project cost; $12 million. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Midtown Miami Brownfield Redevelopment PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Miami, FL 2007 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm Served as landscape architect for the "Shops at Midtown Miami," the largest urban infill redevelopment project in Miami-Dade County. The project is located on 56-acre Brownfield site previously owned by the FEC Railroad and involved planning, design, and construction of all public and private infrastructure to serve 3,500 residential units, 800,000 square feet of commercial, and 15,000 d. square feet of office space. Some of the major infrastructure components included FPL and telecommunications duct banks, storm drainage wells, traffic signals and roadways, and a street car system. Infrastructure also included 12,500 linear feet of new 12-inch water distribution mains and 6,500z linear feet of new 8-inch to 20-inch sanitary sewer mains, which required a 100-linear-foot bore- and-jack beneath FEC Railroad and interconnection with an existing 72-inch live interceptor at Biscayne Boulevard. Kimley-Horn designed water and sewer service connections for future parcel developments. Served as District Engineer for the Midtown Miami Community Development District (CD D). The project consisted of 14 development blocks, which required extensive coordination with multiple developers, design professionals, and contractors. The project was within the jurisdiction of the City of Miami, Miami- Dade County, FDOT, Miami-Dade DERM, FDEP, and the Miami-Dade Water and Sewer Department (and also required coordination and approvals from these agencies). Firm fee: $3.5 million; total project cost: $650 million. (1) TITLE AND LOCATION (Ci/yand State) (2) YEAR COMPLETED Grand Boulevard PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Sandestin, FL 2007 (Phase 1) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm Grand Boulevard at Sandestin is a high-end, new-urbanism town center development located in Walton County. As a landscape architect with Kimley-Horn, responsibilities included permitting and design services for the office park, seasonal color beds, hardscape designs, and median landscape and lighting design. Firm fee: $800,000. STANDARD FORM 330 (1/2004) 1Il""'1- n Kimley-Horn ~_ U and Associates, Inc. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Comolete one Section E for each kev Derson.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Kevin Schanen, P.E. Hurricane Recovery and Debris a. TOTAL I b. WITH CURRENT FIRM Monitorinq, General Desian Services 13 12 15. FIRM NAME AND LOCATION (City and State) Kimley-Horn and Associates, Inc., West Palm Beach, FL 16. EDUCATION (DEGREE AND SPECIALlZA TlON) 117. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science/Civil Engineering/University of Florida FL/P.E./60251 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Florida Engineering Society National Society of Professional Engineers American Society of Civil Engineers American Water Works Association 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Martin Regional Utility (SMRU) Hurricane Recovery and PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) Disaster Management/Recovery Services 2005 Stuart, FL a. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm Served as project engineer on the response team that provided emergency engineering services to South Martin Regional Utility (SMRU) immediately after the passing of the 2004 and 2005 hurricanes. Also prepared engineering plans and specifications to repair damage to the utility-owned facilities. Firm fee: $150,000; total project cost: $821,000. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Town of Palm Beach Marina and Dock Repairs and Rehabilitation PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) Palm Beach, FL 2005 (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm b. Served as project manager for the repair and rehabilitation of the Town of Palm Beach's public marina after the 2004 hurricanes. The project also included the rehabilitation of concrete bents that support the aluminum decking of the docks that had begun to experience spalling and corrosion of the reinforcement. Plans and specifications were developed to repair both the concrete and aluminum components of the docks in order to return the facility to its original condition. Construction phase services were also provided to assist the Town administer the unit price contract. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Worth Avenue Restoration Project PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) Palm Beach, FL 2010 November 2010 (est.) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm c. Serves as the project manager for this roadway beautification project along one of the Town's most prestigious roadways. This project was brought to life by a group of property owners along the Avenue who wish to revitalize the area and bring it back to its former glory. The project includes the construction of a new roadway section, replacement and modification of various underground utilities, replacement of sidewalks with decorative tabby concrete, and the introduction of many landscaping and architectural elements throughout the corridor. Firm fee: $467,000; design cost: $1.4 million (total); construction cost: $13.125 million (estimated). (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Old Boynton Road Utility Relocations PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) Boynton Beach, FL (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm d. Served as project manager for the replacement of an asbestos cement watermain along Old Boynton Road. This project was in response to the need to widen the road and replace an old wooden bridge. The new road's drainage system conflicted with the existing water main in numerous locations and, because it was constructed of asbestos cement, the City decided to replace the main in its entirety. This project also included the abandonment of a 16-inch force main, as well as an aerial crossing of the water main over a Lake Worth Drainage District (LWDD) canal. This project is ongoing; firm fee: $50,000. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 0-2, 0-8, 0-9, 0-10 Stormwater Basin Studies PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) Palm Beach, FL (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm e. Served as project manager to perform a detailed drainage study of the existing stormwater collection and pumping system for these drainage basins, totaling almost 400 acres, located at the north end of the Town of Palm Beach. The purpose of the studies were to determine if the Town's existing stormwater collection system improvement master plan could be further optimized to reduce construction costs. Through our advanced modeling techniques, the Town was able to significantly reduce the cost of the original improvement program while maintaining the level of protection provided by the original plan. STANDARD FORM 330 (1/2004) ~-_n Kimley-Horn -.J U and Associates, Inc. L___ E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT Complete one Section E for each kev Derson.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Rene Portieles, P.E. Structural Engineering a. TOTAL I b. ~ITH CURRENT FIRM 9 15. FIRM NAME AND LOCATION (City and State) Kimley-Horn and Associates, Inc., West Palm Beach, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) Bachelor of Science/Civil and Environmental Engineering/Florida FL/P.E./64035 International University Master of Science/Structural Engineering/University of Florida 18. OTHER PROFESSIONAL QUALIFICATIONS IPublications, Omanizations Trainino. Awards etc.) 19. RELEVANT PROJECTS (1 ) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sugar Sand Park Design PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Boca Raton, FL 2005* (Phase 1) (3) BRIEF DESCRIPTION (Briel scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm a. Project engineer for the Kimley-Horn team that assisted the Greater Boca Raton Beach and Park District with the site planning, civil design, landscape design, environmental permitting, and installation of the carousel as part of the overall development of Phase IV of Sugar Sand Park. The entire park consists of 132 acres of passive and active recreation facilities, including a community center with a theatre and science center, field house, baseball/softball fields, in-line hockey rink, science playground, and picnic pavilions. Kimley-Horn's services for Sugar Sand Park will continue with master planning, environmental permitting, and design of facilities for the development of the final phase of the park. *Phase 4 of this project is onaoina; firm fee: $1 million (desian); $400,000 (master plan); construction cost: $7 million (est.). (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Turnpike Widening from HEFT to Johnson Street PD&E Study and PROFESSIONAL SERVICES I CONSTRUCTION (II Applicable) Design, Broward County, FL 2009 b. (3) BRIEF DESCRIPTION (Briel scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm Provided preliminary bridge design layout for the Turnpike widening over Pembroke Road. The Kimley-Horn team provided simultaneous PD&E and design services to widen Florida's Turnpike Mainline from the Homestead Extension of Florida's Turnpike (HEFT) to just north of Johnson Street in Broward County. Firm fee: $5.59 million; construction cost: $130.5 million. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Port of Miami Command and Control Center Design and PROFESSIONAL SERVICES 1 CONSTRUCTION (If Applicable) Integration, Miami, FL (3) BRIEF DESCRIPTION (Briefscope, size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm Serving as project engineer for Kimley-Horn team. This project involves several separate phases to provide the renovations to an existing terminal to support the command and control center functions at the Port of Miami. Kimley-Horn's early planning level tasks included meetings with stakeholders and Port staff to identify control center requirements that were then summarized in a Concept of Operations c. (CONOPS) document. Following the CONOPS, the design of the interior upgrades to support the control center and supporting offices is ongoing and includes the discovery of infrastructure, security, communications, command and control equipment inventory, reviews and guidance in existing plan sets, and cost estimates. Also included in the design is the communications design to support the network room that will house all the portwide systems. The design effort will also produce an extension of the integration fiber optic network to additional areas of the Port. This project entails the relocation/migration of old communications equipment to the new network room from the old command center without any or very little disruption to the communications system. Kimley-Horn is providing production of construction packages, feasibility and operational reports, post-design phase services, and coordination with the client This project is ongoing; firm fee (to date): $250,000; total project cost: $4 million. (1 ) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Harbor Branch Reverse Osmosis Water Treatment Plant (ROWTP) PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Fort Pierce, FL (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm Served as project engineer to perform assessment of tank inspection and provide a tank inspection report. KHA is involved in the planning, design, permitting, and construction phase services for the Harbor Branch Oceanographic Institute's (HBOI) expansion of its existing d. ROWTP from a capacity of 33,780 GPD to 80,000 GPD. HBOI owns and operates a ROWTP that converts surficial aquifer water to drinking water to serve their main campus. HBOI intends to increase capacity to meet the growing demands of the facility. KHA performed a due diligence review of the existing ROWTP and was able to identify and recommend improvements that would both increase the plant's capacity and make the operations of the plant more cost-effective. The proposed improvements have been designed in phases in order to immediately increase the capacity of the existing facility while planning and designing for the complete expansion of the facility. We are also responsible for modifying the plant's existing water use and industrial wastewater permits to reflect the increase in the plant's capacity. This project is ongoing; project cost: $15,000 (design); $100,000 (construction). (1 ) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Property Condition Assessments PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Sunny Isles Beach, Miami, Kissimmee, and Weston, FL (3) BRIEF DESCRIPTION (Briefscope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm e. Serves as project engineer for a variety of commercial and industrial building assessments of structural, mechanical, electrical, and plumbing systems. Early planning level tasks included meetings with site managers, attorneys, and building engineering staff to identify deficiencies throughout the systems. Following the assessment, portions of the report that require immediate repair action are designed. The plans and specification are then permitted and construction phase services are provided. Recent projects include the design of drainage and utility systems that were not performing as originally designed. These projects are ongoing; total project cost to date: $400,000. STANDARD FORM 330 (1/2004) ~_ n Kimley.Horn IIII.....J_ U and Associates, Inc. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Comolete one Section E for each key oerson.! 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Lynn Kiefer, PWS Environmental Services a. TOTAL I b. WITH CURRENT FIRM 20 18 15. FIRM NAME AND LOCATION (City and State) Kimley-Horn and Associates, Inc., Vero Beach, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) Bachelor of Science/Marine Biology/Auburn University FLlPWS/000949 Master of Science/Coastal Zone Management/Oceanography/Florida Institute of Technology 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) ~ nf 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Continuing Environmental Services PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Plantation, FL 2003 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm Project manager. KHA was responsible for completing the Programmatic Categorical Exclusion checklist and documentation for a. four Local Agency Program (LAP) funded projects in the City of Plantation, including a bus tram stop project, streetscape improvements to NW 84th Street, a linear park along the C-12 canal and a multi-use trail project. The LAP program provides federal funding for municipal projects. The services involved evaluating the sites for wetlands, listed species and contamination involvement, and completing the documentation to demonstrate that the project impacts were minor and could meet the requirements to categorically exclude the project from the National Environmental Policy Act. Documentation was submitted to the Florida Department of Transportation on behalf of the City for review and approval. Total project cost: $95,000. (1) TITLE AN D LOCATION (City and State) (2) YEAR COMPLETED MDX Design Engineering for SR 874 from Kendall Drive to SR 826 PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Miami, FL b. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm Serving as environmental scientist for the Kimley-Horn team that is providing design engineering services for SR 874 (Don Shula Expressway) roadway modifications from south of SW 88th Street (Kendall Drive) to south of SR 826 (Palmetto Expressway)/SR 874 interchange. This project is ongoing; firm fee: $2.2 million; total project cost: $80 million (est.). (1) TITLE AN D LOCA TION (City and State) (2) YEAR COMPLETED Ocean Sands PROFESSIONAL SERVICES I CONSTRUCTION (If Applicabfe) Indian River County, FL (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm Serves as project manager for this ocean front residential development. Kimley-Horn has been responsible for all site planning, c. environmental assessments, dune cross over design, permitting including Coastal Construction Control Line permitting, traffic analysis, and roadway design along SR AlA for this high end ocean front residential development. Detailed coordination was required with the Florida Department of Environmental Protection for the stormwater management system and for the coastal permitting. Detailed sea turtle protection plans were prepared and approved by the Florida Fish and Wildlife Conservation Commission. This project is ongoing; firm fee (to date): $480,775. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Arlington Lakes PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Naples, FL 2005 (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm Environmental task manager for the environmental resource permit (ERP) and U.S. Army Corps of Engineers (USACE) Section 404 dredge and fill permit. Worked with the client's previous design engineer to obtain the conceptual ERP. The project involved approximately 30 acres of wetland impact and Kimley-Horn developed a mitigation plan that was a flow way concept d. that connected the mitigation on this site to mitigation within projects north and east of the site and allowed for future projects south and west of the site to connect to the overall flow way. The flow way on the Arlington Lakes site was the largest portion of the overall flow way and was the central link between to previously permitted flow ways. Kimley-Horn was also hired to prepare all site civil construction plans for a modified design and obtained all local government approvals for this modified plan. Permitting required extensive coordination with USACE, South Florida Water Management District, the U.S. Environmental Protection Agency, and the U.S. Fish and Wildlife Service. The ERP and Section 404 permit applications involved extensive alternatives analyses evaluations, secondary and cumulative impact assessments, and detailed mitigation and monitoring plan preparation. The mitigation plan included an approximately 22-acre onsite mitigation area consisting of wetlands enhancement and a mosaic of forested and herbaceous wetland creation. Firm fee: $24,030. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Florida Regional Transportation Authority General Planning PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) Consultant, Miami-Dade/Broward/Palm Beach Counties, FL (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm e. Environmental scientist responsible for several documented categorical exclusions for several proposed improvements at Tri- Rail Stations in West Palm Beach, Pompano Beach and Dania. Also responsible for environmental reviews of three potential new station sites in Palm Beach and Broward County as part of a master plan review. This project is ongoing; firm fee: $750,000; total project cost: $1 million. STANDARD FORM 330 (1/2004) ~-n Kimley-Horn IIIIIII....J_ U and Associates, Inc. 20. EXAMPLE PROJECT KEY NUMBER F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects. If not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) Midtown Miami Brownfield Redevelopment Miami, FL 1 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if Applicable) 2007 2007 23. PROJECT OWNER'S INFORMATION b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Bruce Cutright, Research Scientist 561-232-0775 a. PROJECT OWNER Midtown Miami Community Development District 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost) Located in the heart of Miami, this 56-acre Brownfield is the largest redevelopment project in the City of Miami. Kimley-Horn worked with the architectural design team to develop a truly urban mixed-use master plan to support 1.2 million square feet of commercial development, 4,500 residential units, offices, and parks on this contaminated rail yard. The design includes nearly 12,000 linear feet of urban streetscapes, a linear park system, an urban plaza, and a series of vest pocket parks. Kimley-Horn authored streetscape design guidelines for the project and prepared a Regional Activity Center (RAC) justification report to increase DRI thresholds. The project received more than $10 million in grant funding for the redevelopment. Kimley-Horn also provided Brownfield assessment and remediating design services for this site. Remediation consisted of source removal in addition to engineering and institutional controls. Kimley Horn was able to integrate the necessary site remediation with the actual redevelopment, saving the client millions of dollars in soil disposal costs. A Site Rehabilitation Completion Order (SRCO) was obtained from the FDEP for the site in 2006. ~-- ... In addition, Kimley-Horn designed all public infrastructure, including roadways and utilities, and has provided traffic, landscape architecture, and urban planning services for Midtown Miami. This project is an example of the turnkey type of Brownfield redevelopment services Kimley-Horn offers, and we are very proud of the fact that Midtown Miami is the recipient of the EPA Region 42009 Phoenix Award, the nation's most prestigious award for Brownfield redevelopment. Firm fee: $3.5 million; total project cost: $650 million. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (3) ROLE Urban design, land use, and comprehensive planning, landscape architecture (3) ROLE Project management, permitting, agency coordination, civil engineering, utility engineering, funding, traffic engineering, transportation planning (3) ROLE Environmental services (1) FIRM NAME (2) FIRM LOCATION (City and State) a. Kimley-Horn and Associates, Inc. West Palm Beach, FL (1) FIRM NAME (2) FIRM LOCATION (City and State) b. Kimley-Horn and Associates, Inc. Miami Beach, FL (1) FIRM NAME (2) FIRM LOCATION (City and State) C. Kimley-Horn and Associates, Inc. Vero Beach, FL (1) FIRM NAME (2) FIRM LOCATION (City and State) d. (3) ROLE STANDARD FORM 330 (1/2004) ~=~ Kimley-Horn and Associates, Inc. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) Worth Avenue Restoration Project Palm Beach, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if Applicable) 2010 November 2010 (est.) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER T own of Palm Beach b. POINT OF CONTACT NAME Charles Langley, P.E., Assistant Public Works Director c. POINT OF CONTACT TELEPHONE NUMBER 561-838-5440 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost) Kimley-Horn is serving as site civil and traffic engineer for the Worth Avenue Restoration Project, which was brought to life by a group of property owners along Worth Avenue who wanted to revitalize the area and bring it back to its former glory. This project encompasses three city blocks and includes the construction of a new roadway section, replacement and modification of various underground utilities, replacement of sidewalks with decorative tabby concrete, and the introduction of many landscaping and architectural elements throughout the corridor. As a subconsultant to Bridges, Marsh and Associates, Inc., Kimley-Horn was responsible for the design of all civil and traffic engineering related elements of the project. The design was completed in January 2010, with construction beginning in April 2010. Firm fee: $467,000; design cost: $1.4 million (total); construction cost $13.125 million (estimated). ~---- 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME a. Kimley-Horn and Associates, Inc. (2) FIRM LOCATION (City and State) West Palm Beach, FL (3) ROLE Project management, civil and traffic engineering (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. STANDARD FORM 330 (1/2004) ~=~ Kimley-Horn and Associates, Inc. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, If not specified. 3 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED NW 37th Avenue Water and Sewer Improvements PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable) Miami-Dade County, FL 2007 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Miami-Dade Water and Sewer Reynaldo Abreu, Program 786-552-8161 Department (MDWASD) Management Division 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) This project is part of the Miami-Dade Water and Sewer Department's (MDWASD) "Needs Assessment Program" (NAP). It consisted of the preparation of a technical memorandum to evaluate alternatives and recommend improvements within a 2,OOO-acre area of unincorporated Miami-Dade County that had little or no existing water and sewer infrastructure. Improvements were necessary to expand the capacity of the existing system and sustain future economic redevelopment within the area. Additionally, though the project area is within unincorporated Miami-Dade County, portions of it receive water service via water mains owned and operated by the adjacent City of Hialeah. Part of our services included developing a plan to disconnect services from the City of Hialeah and reconnect them to the County's water distribution system. The scope of services included data collection; site investigations; and researching utility billing records to identify properties currently without water and sewer service or being served by the City of Hialeah. Other tasks performed included environmental site assessments, researching right-of-way availability, coordination with regulatory agencies and stakeholders, future demand projections, hydraulic modeling to identify system deficiencies and the development of alternatives to meet current and future potable service and fire protection demands. Alternatives were evaluated based on several factors, such as hydraulic performance, constructability, economics, right-of-way availability, and impacts to the community. Kimley-Horn delivered a Technical Memorandum to MDWASD containing all findings and recommendations for implementation of improvements. Firm fee: $570,000; total project cost: $9.5 million (estimated). 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Kimley-Horn and Associates, Inc. Miami Beach, FL Project management, data collection, site a. investigations, environmental site assessments, agency coordination, hydraulic modeling (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. STANDARD FORM 330 (1/2004) ~=~ Kimley-Horn and Associates, Inc, 20. EXAMPLE PROJECT KEY NUMBER F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 4 21. TITLE AND LOCATION (City and State) SR 710/Beeline Highway Design (from Military Trail to Congress Avenue) FOOT District Four 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if Applicable) 2007 (design) 2009 (Phase 1)* 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER 954-777 -4680 b. POINT OF CONTACT NAME John Thompson, P.E., Project Manager 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) a. PROJECT OWNER FDOT District Four Kimley-Horn prepared roadway, bridge design, landscape, and irrigation plans for this three-phase, 5.35-mile section of SR 710 through the City of Riviera Beach. The project replaces the existing rural two-lane undivided road with an urban divided four-lane typical section. The typical section consists of a 22-foot landscape median, 12-foot through lanes, four-foot designated bike lanes, and a continuous six-foot- wide sidewalk on both sides of the road. The existing bridge at the South Florida Water Management District (SFWMD) Canal C-17 will be replaced by a new bridge with the same typical section as above, westbound right- and left-turn lanes, barrier walls, and handrails. The City of Riviera Beach is the maintaining agency for the landscape and irrigation portion of the project. KHA coordinated closely with City staff on the proposed landscape and irrigation materials to ensure they were low maintenance and equipment that they had readily available. We paid careful attention to not obstruct existing billboards with landscaping along the corridor, to maintain vegetation management zones permitted by FDOT, and to coordinate with each company holding a sign permit with FDOT. Further permitting of the landscape and irrigation plans was required by FDOT, Palm Beach County, and the South Florida Water Management District. *Phases 2 and 3 are ongoing; firm fee: $3.2 million; total project cost (for Phases 1, 2, and 3): $29 million. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME Kimley-Horn and Associates, Inc. a. (2) FIRM LOCATION (City and State) (3) ROLE Roadway engineering, landscape architecture Miami Beach, FL (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. STANDARD FORM 330 (1/2004) ~-_n Kimley-Horn ~ U and Associates, Inc. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) Town Engineering Services Miami Lakes, FL a. PROJECT OWNER Town of Miami Lakes 20. EXAMPLE PROJECT KEY NUMBER 5 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if Applicable) 23. PROJECT OWNER'S INFORMATION b. POINT OF CONTACT NAME Osdel Larrea c. POINT OF CONTACT TELEPHONE NUMBER 305-364-6100 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost) Kimley-Horn has served the Town of Miami Lakes as its Town Engineer since 2007. Miami Lakes has contracted with our firm to provide all aspects of engineering associated with the Town, including providing staff to fill the positions of Public Works Director and Stormwater Utility Director. With Miami Lakes' recent incorporation, they needed to assess the infrastructure within the Town limits. Kimley-Horn provided Miami Lakes with an assessment of the conditions of the roads, sidewalks, signing, and striping within the Town limits. The recommendations from this assessment included a prioritization of the improvements along with a five-year capital improvements program. To facilitate implementing these improvements, we provided construction documents and obtained bids from contractors to implement the projects. Other achievements include obtaining a grant from the Metropolitan Planning Organization to prepare a Transportation Master Plan. Specific projects have included: NW 8ih Avenue Design - roadway design, landscaping plans, and construction documents (completed 2006) Miami Lakeway North - roadway and drainage improvements (completed 2004) Lake Elizabeth Drainage Improvements - roadway restoration/resurfacing and drainage improvements (ongoing) NW 1541h Street Drainage Improvements - roadway restoration/resurfacing and drainage improvements (completed 2006) Stormwater Master Plan and Stormwater Utility Report (completed 2006) Stormwater Master Plan Update (completed 2006) Loch Ness Roadway and Drainage Improvements - roadway retention/resurfacing and drainage improvements (completed 2008 ) This contract is ongoing; firm fee varies per work order - annual fee: $130,000. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Kimley-Horn and Associates, Inc. West Palm Beach, FL Traffic engineering (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. STANDARD FORM 330 (1/2004) ~=~ Kimley-Horn and Associates, Inc. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION ICity and State) South Florida Regional Transportation Authority General Planning Consultant Miami-Dade/Broward/Palm Beach Counties, FL 23. PROJECT OWNER'S INFORMATION 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if Applicable) a. PROJECT OWNER South Florida Regional Transportation Authority b. POINT OF CONTACT NAME Bill Cross, Manager of Planning and Capital Development c. POINT OF CONTACT TELEPHONE NUMBER 954-788-7909 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Since 2004, Kimley-Horn has served as the general planning consultant to the South Florida Regional Transportation Authority, which operates the Tri-Rail commuter rail service between West Palm Beach and Miami. Tri-Rail is the only existing commuter rail service in Florida. Responsibilities include short- and long-range transportation planning, facilities planning and development, alternative analyses and major investment studies, station area/transit-oriented development and oversight, financial planning and analysis, environmental analysis, and conceptual site planning. Recent assignments performed under the contract have included an evaluation of FT A funds distributed to the Miami Urbanized Area, a system-wide study of existing and future parking and circulation needs at Tri-Rail stations, identification and evaluation of sites for new Tri-Rail stations, assessment of transit oriented development proposals at Tri-Rail Stations, and the development of site plans for station improvements. Through these efforts, Kimley-Horn has become well versed in the planning and operations of commuter rail service in the South Florida region. This project is ongoing; firm fee: $750,000; total project cost: $1 million. F1iIiI3~~~mim ~~ ~ SFR1:\ llo11rd 'Ieelin~ - Oetobe~ 2~. 2008 - - . t-- t::S ~ ~ I I ~^ I _ _ _.::.. !l'" , ~__ I 'M~ _.. ~'_~ ~ ~~ 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION ICityandState) (3) ROLE a. Kimley-Horn and Associates, Inc. Vero Beach, FL Environmental reviews (1) FIRM NAME (2) FIRM LOCATION ICityandState) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION ICity and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION ICity and State) (3) ROLE d. STANDARD FORM 330 (1/2004) ~=~ Kimley-Horn and Associates, Inc. 20. EXAMPLE PROJECT KEY NUMBER F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) Flagler Memorial Bridge PD&E Study FOOT District Four 7 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if Applicable) 2008 (PD&E)' 23. PROJECT OWNER'S INFORMATION b. POINT OF CONTACT NAME Joshua Salazar, P.E., Project Manager 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost) a. PROJECT OWNER FDOT District Four The Flagler Memorial Bridge is the northernmost of the three bridges that connect West Palm Beach to Palm Beach. It is also the oldest movable bridge between Cape Canaveral and North Miami and has been declared a landmark by the Town of Palm Beach. Unfortunately, this historically significant bridge has been labeled both functionally obsolete and structurally deficient by FDOT. In 2005, FDOT District Four retained Kimley-Horn to conduct a PD&E Study to determine how best to replace or repair the bridge. This study will analyze various engineering concerns, including bridge type (fixed versus bascule), the possible construction of a temporary bridge, the placement of bridge touch downs, connections to Flager Drive and Royal Poinciana Plaza, bridge alignment, and construction phasing. Environmental issues will also be defined and analyzed; these include permit coordination with the regulatory agencies, impacts upon the natural enviornment (wetlands, seagrass, endangered and threatened species, water quality), contamination, and historic and cultural resources that may be affected by bridge construction. The study will also feature a public involvement process, which includes public information meetings to keep the public informed of the project's progress. Because this project affects two very different municipalities - the Town of Palm Beach and the City of West Palm Beach - the public involvement program must be sensitive to a diverse group of stakeholders. The bridge was named for Henry Flagler, the oil magnate and visionary who built the railroad that at one time extended from Jacksonville through Miami, and eventually to Key West. Flagler's Palm Beach residence, Whitehall, is now a museum located just south of the bridge on Cocoanut Row. 'Design is ongoing (scheduled for completion in 2011); construction cost: $110 million. c. POINT OF CONTACT TELEPHONE NUMBER 954-777 -4635 ..~ (1) FIRM NAME (2) FIRM LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. Kimley-Horn and Associates, Inc. Vero Beach, FL (1) FIRM NAME (2) FIRM LOCATION (City and State) b. (1) FIRM NAME (2) FIRM LOCATION (City and State) c. (1) FIRM NAME (2) FIRM LOCATION (City and State) d. (3) ROLE Environmental assessment, evaluation, and permitting (3) ROLE (3) ROLE (3) ROLE STANDARD FORM 330 (1/2004) ~=~ Kimley-Horn and Associates, Inc. 20. EXAMPLE PROJECT KEY NUMBER F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT {Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.} 21. TITLE AND LOCATION (City and State) Village at Gulfstream Park Design Guidelines Hallandale Beach, FL 8 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if Applicable) 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER 216-416-3230 a. PROJECT OWNER Forest City Commercial Group b. POINT OF CONTACT NAME Will Voegele 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost) The Village at Gulfstream Park is a 60-acre mixed-use development of regional impact (DRI) that will be built adjacent to the existing Gulfstream Park horseracing facility in Hallandale Beach, Florida. This redevelopment project will replace an area previously used only as a vast surface parking facility with a large- scale mixed-use development of 750,000 square feet of shops and restaurants, 140,000 square feet of office use, a 2,500-seat movie theater, 500 hotel rooms, and 1,500 condominium units. Kimley-Horn provided site civil engineering, traffic engineering and planning services for this project. Some of the planning services provided by Kimley-Horn include preparing Comprehensive Plan Amendment applications and analyses, zoning language to establish a new zoning category, and design guidelines to establish the building and planning parameters for the site. Kimley-Horn's traffic engineers prepared local and regional traffic impact analyses to address traffic impacts from the project and also developed a unique set of mitigation measures that included broad-based, multimodal solutions involving transit, Intelligent transportation systems and transportation demand management solutions. Kimley-Horn's site civil engineering work has included preparing site civil plans, obtaining permits, designing utility improvements, and on- and off-site stormwater modeling. This project is ongoing; firm fee (to date): $500,000. Image prol'ided courtesy ofl'(1imberly Allison Tong & Goo 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (3) ROLE Civil engineering and permitting services, DRI, traffic and roadway services, project coordination, planning services (3) ROLE Project management (1) FIRM NAME (2) FIRM LOCATION (City and State) Kimley-Horn and Associates, Inc. West Palm Beach, FL a. (1) FIRM NAME (2) FIRM LOCATION (City and State) b. Kimley-Horn and Associates, Inc. Vero Beach, FL (1) FIRM NAME (2) FIRM LOCATION (City and State) C. (1) FIRM NAME (2) FIRM LOCATION (City and State) d. (3) ROLE (3) ROLE STANDARD FORM 330 (1/2004) ~__" Kimley-Horn ~ U and Associates, Inc. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, If not specified. 9 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED In-line Booster Pumping Station PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable) Palm Beach, FL 2009 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Town of Palm Beach Charles Langley, P.E., Assistant 561-838-5440 Public Works Director 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost) Kimley-Horn recently completed engineering and design services for the Town of Palm Beach to develop a sanitary in-line booster pumping station at an existing re-pump facility owned by the City of West Palm Beach. Kimley-Horn and the Town had worked together years earlier to develop the concept of constructing this type of station to eliminate the existing repump facility that has been plagued by maintenance problems, odor control issues, and deterioration due to age. The new station will allow the Town to abandon the existing station and allow the City of West Palm Beach to convert the re-pump station into a storage facility. The proposed in-line booster station will handle approximately 5 MGD and boost pressures to pump the Town's wastewater west to the East Central Regional Wastewater Treatment Facility. Firm fee: $164,000. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE a. Kimley-Horn and Associates, Inc. West Palm Beach, FL Project management, engineering, design services (1) FIRM NAME (2) FIRM LOCATION (Ci/yandState) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (Ci/yandS/a/e) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. STANDARD FORM 330 (1/2004) ~=~ Kimley-Horn and Associates, Inc. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, If not specified. 10 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Forcemain System Evaluation PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable) Palm Beach, FL 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER I b. POINT OF CONTACT NAME I c. POINT OF CONTACT TELEPHONE NUMBER Town of Palm Beach Jim Bowser 561-227-7022 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Kimley-Horn is currently developing a model of the Town's forcemain system to determine the capital improvements necessary to convert the existing cascading system to a manifold system. This study includes determination of new forcemain sizes, locations, necessary pump station upgrades, in-line pump station feasibility, phasing plans, and cost estimates. A major goal of the study is to eliminate the need for the Town to transmit wastewater through the City of Lake Worth forcemain system. This project is ongoing: firm fee (to date): $49,500. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Kimley-Horn and Associates, Inc. West Palm Beach, FL Project management, forcemain evaluation (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (1/2004) ~=~ Kimley-Horn and Associates, Inc. J G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing PERSONNEL CONTRACT table. Place "X" under project key number for (From Section E, (From Section E, oarticioation in same or similar role.) Block 12) Block 13) 1 2 3 4 5 6 7 8 9 10 Adam Kerr, P.E. Project Manager, Traffic X X X X X X X Engineering Construction Juan Jimenez, P.E. ManagemenUI nspectionlT esting, X X X General Design Services Michael Madsen, RLA Landscape Architecture X X Hurricane Recovery and Debris Kevin Schanen, P.E. Monitoring, General Design X X X X Services Rene Portieles, P.E. Structural Engineering Lynn Kiefer, PWS Environmental Services X X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) South Florida Regional Transportation Authority General 1 Midtown Miami Brownfield Redevelopment, Miami, FL 6 Planning Consultant, Miami-Dade/Broward/Palm Beach Counties, FL 2 Worth Avenue Restoration Project, Palm Beach, FL 7 Flagler Memorial Bridge PD&E Study, FDOT District Four 3 NW 37th Avenue Water and Sewer Improvements, Miami- 8 Village at Gulfstream Park Design Guidelines, Hallandale Dade County, FL Beach, FL 4 SR 710/Beeline Highway Design (from Military Trail to 9 In-line Booster Pumping Station, Palm Beach, FL Congress Avenue), FDOT District Four 5 Town Engineering Services, Miami Lakes, FL 10 Forcemain System Evaluation, Palm Beach, FL STANDARD FORM 330 ~_-n Kimley-Horn 11II.....I U and Associates, Inc. H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. Kimley-Horn and Associates, Inc. (KHA) is a full-service, multidisciplinary consulting firm offering a broad range of engineering, landscape architecture, planning, and environmental services to clients in both the public and private sectors. Incorporated in 1967 by transportation engineers in Raleigh, North Carolina, KHA first became well known for its expertise in transportation planning and traffic engineering. In the early 1970s, the firm built an impressive track record in regional and urban area transportation planning, traffic impact analysis, parking planning and design, traffic control system design, and statewide and local traffic operations and safety studies. During this period, the firm also added practices in structural, highway, and bridge design, as well as airport planning and design. In 1983, KHA merged with Hutcheon Engineers of West Palm Beach, Florida, to enhance its general civil and surveying practices. Further diversification of KHA's services and geographic practice followed over the years through the hiring and development of practice builders, as well as through several key acquisitions and mergers. Urban Resource Group (URG), KHA's specialized landscape architecture and urban planning division, was created more than 20 years ago. The firm's commitment to growth and reliance on practice builders to fuel that growth by taking advantage of niche markets has enabled KHA to become one of the premier consulting firms in the nation. Today, KHA has nearly 1,500 employees in 55 offices throughout 15 states. Their offices are geographically grouped nationally under six regions: Florida, Southeast, Mid-America, Mountain, Texas, and California. Florida comprises the firm's largest region, with more than 400 employees in 17 offices. Throughout their 43-year history, KHA has demonstrated its ability to effectively provide innovative, high-quality consulting services to a wide variety of clients. KHA offers a wealth of in-house capabilities and an experienced professional team that has served Florida for more than 40 years. Their multidisciplinary services and disciplines include, but are not limited to: I, !JiU' t ~, ~ .~.. DesliD " ~_=r-~ - r;o ~J. Ii' .. II ~. Jaamlll :.::~. ~.........."" ~ - , ~ ~ ft ~ I~ ~ ~ ......~'l:== Ii ('Tal -~-~ .. il;::::r;t\ '~l ~~_-" '1_ '~ ,n ~ w/ _. ~p-" t,,; ~-D"';1:'i:I. i"'"", '1 ~lIa '1llI~ --'tr:::'. II .va.. . -11:I ~ ~ ..I I::f.. ~ ~t r= i.~:::. ~8D..dD~1~"l ..... .. II'\: TlI!Ilf~" .. itl8rid- . . v _ .. ....- - - 'i!:::: ..- __.- ~di; - ~ .'-~~BL la --- ~ ~t!.. _ -~ ~ PlJtIl...-:- - ILJ ~~~.= ~r. r:r.,- .~ == - - - fIrIlDInDI \.. =i!: =---r -""~I 1 ~I r- Bad! ~ Florida Office Locations . Transportation planning and traffic engineering Landscape architecture Environmental permitting, assessment, and remediation Construction administration, coordination, and observation Construction engineering inspection and review services Bridge and structural design Urban design and streetscaping LEED program management Parks and trails planning and design Roadway design and construction administration Site planning, comprehensive planning, and master planning Low impact development Water and wastewater system design Stormwater management and master planning Utility development Paving and drainage design/rehabilitation Site civil engineering Land development services Value Engineering Public involvement programs Grant funding, loan, and other intergovernmental funding assistance . I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. -' 32. DATE May 25, 2010 STANDARD FORM 330 (1/2004) .......-J _ n Kimley-Horn ~_ U and Associates, Inc. 1. SOLICITATION NUMBER (lfany) ARCHITECT - ENGINEER QUALIFICATIONS RFQ No. 10-04-01 PART 11- GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER Kimley-Horn and Associates, Inc. 1968 118604768 2b. STREET 5. OWNERSHIP 4431 Embarcadero Drive a.TYPE 2c. CITY 12d. STATE 12e. ZIP CODE Corporation West Palm Beach FL 33407 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE No Adam Kerr, P.E., Project Managerrrransportation Engineer 7. NAME OF FIRM (If block 2a is a branch office) APHC, Inc. 6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS 561-845-0665 Adam. Kerr@kimley-horn.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function c. No. of Employees a. Profile c. Revenue b. Discipline b. Experience Index Number Code (1)FIRM (2) BRANCH Code (see below) 02 Administrative 136 15 A06 Airports: Terminals; & Hangars: Freight 3 08 CADD Technicians 60 2 Bridges 3 12 Civil Engineers 392 16 C10 Commercial Building: (low rise); Shopping 2 13 Communications Engineers 27 2 D03 Desalinization (Process & Facilities) 2 15 Construction Inspectors 3 1 E01 Ecological & Archeological Investigations 1 38 Land Surveyors 8 1 E09 Environmental Impact Studies. Assessments 3 39 Landscape Architects 42 2 E12 Environmental Remediation 2 42 Mechanical Engineers 6 2 F05 Forensic Engineering 1 47 Planners: Urban/Regional 30 3 G01 Garages; Vehicle Maintenance Facilities; 1 48 Project Managers 195 12 H01 Harbors: Jetties; Piers; Ship Terminal 1 57 Structural Engineers 37 4 H07 Highways: Streets: Airfield Paving: Parking 8 58 Technician/Analysts 108 13 101 Industrial Buildings: Manufacturing Plants 2 60 Transportation Engineers 184 11 001 Office Building; Industrial Parks 1 63 Design Technicians 43 4 P06 Planning (Site, Installation and Project) 6 64 Technical Writers 46 6 R04 Recreational Facilities 3 65 Technical Support 126 15 S04 Sewage Collection, Treatment & Disposal 1 66 Graphic Designers 15 3 S09 Structural Design; Special Structures 3 S10 Surveying; Platting; Mapping: Flood Plain 3 S13 Stormwater Handling & Facilities 3 T03 Traffic & Transportation Engineering 6 Other Employees 68 0 W02 Water Resources; Hydrology; Ground Water 3 Total 1526 112 W03 Water Supply/TreaUDistrib 5 11. ANNUAL AVERAGE PROFESSIONAL SERVICES PROFESSIONAL SERVICES REVENUE INDEX NUMBER REVENUES OF FIRM FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million (Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work 8 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater c. Total Work 8 12. AUTHORIZED REPRESENTATIVE . The foregoing is a statement of facts. a.tt::;~-L I b. DATE - May 25, 2010 c. ~E ANO TITLE , Jerry Ingram, P.E., Senior Vice PresidenUPrincipal Associate AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 5/1/2004 STANDARD FORM 330 (1/2004) ~_-n Kimley-Horn ~ U and Associates, Inc. 1. SOLICITATION NUMBER (lfany) ARCHITECT - ENGINEER QUALIFICATIONS RFQ No. 10-04-01 PART 11- GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 6. DUNS NUMBER Kimley-Horn and Associates, Inc. 1995 969678226 2b. STREET 5. OWNERSHIP 1691 Michigan Avenue, Suite 400 a.TYPE 2c. CITY 12d. STATE 12e. ZIP CODE Corporation Miami Beach FL 33139 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE No Juan Jimenez, P.E., Engineer/Associate 7. NAME OF FIRM (If block 2a is a branch office) APHC, Inc. 6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS 305-673-2025 Juan.Jimenez@kimley-horn.com 8a. FORMER FIRM NAME(Sl {If anvJ 8b. YR. ESTABLISHED 8c. DUNS NUMBER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function c. No. of Employees a. Profile c. Revenue b. Discipline b. Experience Index Number Code (1) FIRM (2) BRANCH Code (see below) 02 Administrative 136 2 C10 Commercial Building; (low rise); Shopping 3 08 CADD Technicians 60 1 E01 Ecological & Archeological Investigations 1 12 Civil Engineers 392 5 E02 Educational Facilities: Classrooms 1 39 Landscape Architects 42 2 H07 Highways; Streets; Airfield Paving; Parking 2 48 Project Managers 195 1 H09 Hospitals & Medical Facilities 1 58 Technician/Analysts 108 5 H11 Housing (Residential, Multifamily, 3 63 Design Technicians 43 1 101 Industrial Buildings: Manufacturing Plants 1 65 Technical Support 126 4 L03 Landscape Architecture 5 001 Office Building; Industrial Parks 3 P06 Planning (Site, Installation and Project) 3 R04 Recreational Facilities 1 S04 Sewage Collection, Treatment & Disposal 3 S13 Stormwater Handling & Facilities 1 T03 Traffic & Transportation Engineering 1 U02 Urban Renewals; Community Development 4 W03 Water Supply/TreaUDistrib 1 Other Employees 424 0 Total 1526 21 11. ANNUAL AVERAGE PROFESSIONAL SERVICES PROFESSIONAL SERVICES REVENUE INDEX NUMBER REVENUES OF FIRM FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million (Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 0 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 6 4. $500,000 to less than $1 million 9. $25 million to less than $50 million b. Non-Federal Work 5. $1 million to less than $2 million 10. $50 million or greater c. Tolal Work 6 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. ~ =:z.,-L I d. DATE I May 25, 2010 c. ~,AME,/ltIJD TITLE Jerry Ingram, P.E., Senior Vice PresidenUPrincipal Associate AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 5/1/2004 STANDARD FORM 330 (1/2004) ~=~ Kimley-Horn and Associates, Inc. 1. SOLICITATION NUMBER (lfany) ARCHITECT - ENGINEER QUALIFICATIONS RFQ NO.1 0-04-01 PART 11- GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 5. DUNS NUMBER Kimley-Horn and Associates, Inc. 1987 969629666 2b. STREET 5. OWNERSHIP 445 24th Street, Suite 200 a. TYPE 2c. CITY 12d. STATE 12e. ZIP CODE Corporation Vero Beach FL 32960-5169 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE No Lynn Kiefer, PWS, Environmental ScientisWice PresidenUSenior Associate 7. NAME OF FIRM (If block 2a is a branch office) APHC, Inc. 6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS 772-794-4100 L ynn.Kiefer@kimley-horn.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function c. No. of Employees a. Profile c. Revenue b. Discipline b. Experience Index Number Code (1) FIRM (2) BRANCH Code (see below) 02 Administrative 136 7 Bridges 1 08 CADD Technicians 60 1 C10 Commercial Building; (low rise); Shopping 7 12 Civil Engineers 392 10 E01 Ecological & Archeological Investigations 1 13 Communications Engineers 27 2 E02 Educational Facilities: Classrooms 1 24 Environmental Scientists 13 2 E09 Environmental Impact Studies, Assessments 1 38 Land Surveyors 8 3 E12 Environmental Remediation 1 39 Landscape Architects 42 1 F05 Forensic Engineering 1 47 Planners: Urban/Regional 30 1 G04 Geographic Information System Services: 1 48 Project Managers 195 6 H07 Highways: Streets: Airfield Paving; Parking 3 58 Technician/Analysts 108 12 H09 Hospitals & Medical Facilities 1 63 Design Technicians 43 1 H10 Hotels; Motels 1 65 Technical Support 126 5 H11 Housing (Residential, Multifamily. 5 101 Industrial Buildings; Manufacturing Plants 1 L03 Landscape Architecture 3 001 Office Building; Industrial Parks 1 P06 Planning (Site, Installation and Project) 6 R04 Recreational Facilities 2 S09 Structural Design; Special Structures 1 S10 Surveying; Platting: Mapping: Flood Plain 2 S13 Stormwater Handling & Facilities 1 Other Employees 346 0 T03 Traffic & Transportation Engineering 3 Total 1526 51 U02 Urban Renewals; Community Development 1 11. ANNUAL AVERAGE PROFESSIONAL SERVICES PROFESSIONAL SERVICES REVENUE INDEX NUMBER REVENUES OF FIRM FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million (Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 3. $250,000 to less than $500.000 8. $10 million to less than $25 million b. Non-Federal Work 7 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater c. Total Work 7 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. at);::/IvJ.. I c. DATE - May 25, 2010 c. ~E AriD TITLE , Jerry Ingram, P.E., Senior Vice PresidenUPrincipal Associate AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 5/1/2004 STANDARD FORM 330 (112004) ~=~ Kimley-Horn and Associates, Inc.