HomeMy WebLinkAboutBCC Engineering
.
a
11III
..
~ ..,- . *...1: " "',Ir;
~_..r~
- .
. 't' _ . _. ~ _.: ..... "'.....
RECEIVED
MAY 2 AQ,~1.q~ Y\ eN
CITY OF SUNNY ISLES BEACH Request for Qualifications No. 10-04-01
OFFICE OF THE CITY CLERK Professional Engineering Services
for the City of Sunny Isles Beach
ORIGINAL
engineering
May 26,2010
~
Ir
CITY OF SUNNY ISLES BEACH R~.
Request for Qualifications No. 10-04-01 · Professional Engineering Service
s
engineering
Business Overview
Bee Engineering, Inc. has been providing Professional Engineering Services in Miami-Dade County since 1994. The
firm was founded in Miami and the Principals and Staff are all long time residents with deep roots in the community.
Over the past few years the firm has grown to sixty nine (69) employees, providing civil and structural engineering
services for local public agencies. We have a permanent full-time staff that includes; eighteen (18) registered
Professional Engineers (P.E.), twelve (12) Engineers in Training (E.I.) and two (2) LEED@ Accredited Professionals. The
staff is fully equipped with state of the art computers, plotters, printers, scanners, and design software. Bee
Engineering, Inc. prides itself on innovative approaches to solve the difficult challenges faced by our clients. Our
staff makes every effort to understand the concerns and needs of the client and they are committed to providing
optimal solutions for all issues involved.
At Bee Engineering, we believe there is no other small civil engineering firm that has the depth and breadth of
resources combined with the knowledge and experience that we offer the City of sunny Isles Beach. Our in-house
capabilities translate into efficiency and increased productivity in the design and preparation of construction
documents. This in turn means the City can also be certain that Bee will provide them with the best value.
The firm over the last two years has been growing from a revenue standpoint. Our annual revenues for fiscal year
2008 were $5.5M and in 2009 they were $ll.5M. The firm is in a healthy financial state with no outstanding debt,
over $500,000+ in accounts receivable and over $15M of backlog looking forward to the next 18 months. The firm is
a Florida Subchapter "5" Corporation with three principal stockholders and 2 associates with financial interest in the
Company.
~ tiJ.1h1 ~
Jose A. Munoz, PE President, Principal 901 Sorolla Avenue
Shareholder Coral Gables, FL 33134
Ariel Millan, PE Vice President, Principal 6990 S.W. 73 Court
Shareholder Miami, FL 33143
Manuel A. Benitez, PE Vice President, Principal 6500 SW 112 Street
Shareholder Miami, FL 33156
Luis A. Rodriguez, PE Associate 1060 Brickell Avenue, Apt. 1715
Aventura, FL 33131
Daniel J. Raymat, PE Associate 3806 SW 79 Avenue, Unit 7 0
Miami, FL 33155
The responsible office for this project will be BeC's Miami Office located at 7300 North Kendall Drive, Suite 400. The
office is located directly across from Dadeland Mall, with easy access to the Palmetto Expressway, US-1 and the
MetroRail. All coordination for the project will be through this office.
Bee Engineering has never in its history had a suit filed; claim filed; or assessed a back charge for work performed.
The firm has also never had a negative, or any ruling for that matter, regarding a judgment or arbitrary proceeding
since its inception.
Project Awareness
Incorporated in 1997 the City of Sunny Isles Beach has embarked on creating a City for its residents and businesses
that promotes a sense of community, enhances its coastal resources and promotes economic opportunity and
security. If selected as the City's engineering consultant our goal will be to assist the City in implementing the
comprehensive plan in any aspects that relate to engineering.
The City has identified 17 initial scope items in the RFQ as services that may be provided by the design consultant.
Our firm has the experience and staff in house to serve the City in the following tasks:
· Structural (Building and Bridge)
· Traffic
1lPage
~ CITY OF SUNNY ISLES BEACH g~;co
Request for Qualifications No. 10-04-01 · Professional Engineering Services
· eonstruction Management
· Construction Inspection
· Hurricane Recovery and debris monitoring services
· General Design Work (Civil)
· Preparation of complete Construction Contract Plans and Special Provisions for the assigned Project
· Post Design Services (Shop Drawing Review and Responses to Request for Information)
· Bid Administration (Selection and Letting)
In addition to these initial services identified, our firm can provide the following services which we feel are beneficial
and unique to the City:
· Grant Development and Administration
· Transit Studies
· Intergovernmental Coordination (FOOT, MDC, etc.)
· In-House Staff Support
· eoncurrency Review
The City is unique, as it consists of ten small islands that are divided by canals or highways which all eventually lead
to Collins Avenue in one form or another. Therefore, from a transportation perspective if traveling by car, bus, bike
or walking there is likely some interaction with a state road facility. As mentioned earlier our firm is capable of
providing all of the services mentioned above, but the greatest strength of our firm is our ability to handle projects
that are on or interact with facilities such as Collins Avenue. We understand the issues the City faces on Collins
Avenue with major resorts and high rise residentials on the east side of the highway and major commercial areas
along the west. Mobility, Aesthetic and Safety are of primary concern along this highway and a primary area were
we can assist the City in developing a coordinated plan with FOOT for this corridor. We mention this as one of the
primary areas we have identified were we can be of tremendous value to the City.
Plannina and Preliminarv Enaineerina
Our staff of engineers has the depth of resources to handle any assignment the City requires. Bee specializes in
providing engineering analysis, preliminary plans and traffic engineering services to handle all engineering
components of a project or support on specific components on other studies. If its traffic engineering we have the
tools available, from a simple Highway Capacity Software analysis to a more complex CORSIM model. Our
engineering effort always includes an extensive analysis of all possible options with the capabilities of providing 30%
plans, engineering reports and preliminary structural, utility and drainage design.
Final Desian
In the development of final design plans for a roadway, a minor improvement or a site, our responsibility will be to
analyze and evaluate design criteria, geometrics, drainage, maintenance of traffic, constructability, biddability,
sequence of construction, aesthetics, utilities, environmental impacts, traffic analysis, signalization, and signage.
Our plans will be prepared utilizing the latest version of AutoCAD. We will propose several phase reviews to the City
during the course of plans development in order to give the City and our Team reassurance that we are meeting the
intent of the design. There are many components that are included in a set of final design plans, but we feel that
some of the most important issues that can affect cost and the public are described in further detail below.
Utilitv Coordination
Early coordination with the utilities and accurate information regarding their facilities can help eliminate conflicts
during construction. Information requested from the utilities will include: 1) location of their existing/proposed
facilities, 2) depth and cover of buried facilities, 3) whether or not buried facilities are encased, 4) is the utility
located in an easement, and 5) whether or not the utility will seek to be reimbursed for relocation. A utility pre-
design meeting will be held and conflicts between the proposed improvements and the utilities will be coordinated
and resolved. Final relocation schedules will be submitted to the utilities at the final plans development. Final
certification will include submitting utility clearance letters with the final package.
2lPage
LIP- CITY OF SUNNY ISLES BEACH g~~"g
Maintenance of Traffic (MOT)
The MOT plan for these projects will be developed in a manner that will minimize construction impacts to local
residents, motorists, pedestrians and bicyclists, as well as conforming to the latest edition of the Manual of Uniform
Traffic Control Devices (MUTCD). The MOT Plan will be coordinated with the City of Sunny Isles Beach, the Florida
Department of Transportation (FDOT) and Miami-Dade County Public Works (if required). MOT will be prepared by
providing typical sections with their respective sequence of construction activities and plan sheets detailing the
proposed MOT. Members of our staff (including our project manager) are certified by the American Traffic Safety
Services Association in the Florida Advanced Work Zone Traffic Control Course.
Detailed Construction Costs
Detailed construction costs with backup information will be provided to the City based on the latest prices for this
type of work. Bee will research the most current information available on bids made by contractors for similar
projects in Miami-Dade County. Quotes from manufacturers will be also used for our estimates.
Post Desian and Preparation of Pre-Bid Documents
The Bee Team will be assisting the City preparing the Bid Documents for this contract. Our past experience in similar
projects will be essential on achieving this task. Bee can assist the City with the following bid and award procedures:
· Review of Final Contract Documents
· Project Advertisement and Bid Document Distribution
· Pre-Bid Conferences
· Preparation and Issuance of Addenda
· Bid Opening and Award
· Preparation of As-Bid Contract Documents
Technical Capabilities
Sustainable Desian
Bee Engineering, Inc. believes in the philosophy of providing sustainable design solutions for our clients. This
involves a careful balance between three driving factors.
Economics - balancing today's construction costs with operational and social costs.
Society - designing projects that do not compromise the integrity of surrounding areas or those of future
generations.
Environment - working within natural systems instead of against them by choosing materials and design
approaches to protect the environment.
· Stormwater Quality Enhancements
· Erosion Control Features
· Tree Preservation
· Pervious Parking Surfaces
· Pedestrian and Bicycle Features
· Multi-modal Transportation
· Underground Utilities
· Dry Stormwater Areas as Amenities
· Passive Parks
One of the most recent examples of utilizing sustainable design is during the development of the Krome Avenue Bike
Trail Project, Bee completed for FDOT and Miami-Dade County Parks Department. As part of this project Bee
specified the use of recycled asphalt pavement as the riding surface for a 23-mile trail. We also specified the use of
recycled lumber materials for the trailhead areas and pervious articulated block for the parking areas.
3lPage
Lrr CITY OF SUNNY ISLES BEACH ;~,,,g
Request for Qualifications No. 10-04-01 · Professional Engineering Services
Experience with Reaulatorv Aaencies
Most public sector projects require coordination across several jurisdictions. Our Team anticipates that assignments
from this contract will require coordination and/or permitting through the following agencies:
. Miami-Dade Department of Environmental Resources Management, DERM - Regulation of surface waters,
wetland impacts, discharges to DERM canals, contamination Issues, etc.
. South Florida Water Management District, SFWMD - Regulation of surface waters, wetland impacts,
discharges to SFWMD canals, dewatering during construction, etc.
. United States Army eorps of Engineers, USAeOE - Regulation of wetland impacts, dredging activities, filling
of surface waters, etc.
· Florida Fish and Wildlife, Fwe - Fish and wildlife resources management.
. US eoast Guard, UseG - Regulation of projects affecting navigable waterways as well as coastal
construction.
. Florida Department of Environmental Protection, FDEP - Control of pollutant discharges into water bodies,
particularly stormwater pollution prevention during construction activities, regulation of stormwater
injection wells, etc.
. The Florida Department of Transportation, FOOT - Regulation of all work that intercepts or impacts a state
road, i.e. US-1.
. eity of North Miami Beach and Miami-Dade Water and Sewer Department (WASD) - Regulation of
modifications or installation of water main, sewer collection system, lift station and force main.
Our Team is well versed in the permitting process associated with all these agencies. We have permitted projects
through them, or have done work under contract directly with these agencies. One of the most critical aspects of
any project is to establish permitting jurisdiction as early as possible and hold pre-application meetings with those
agencies. Because all projects have their intricacies, these meetings are critical in order to determine what the
agency permitting requirements and applicable criteria will be for that specific project; this assures that the project
is on the right path and eliminates costly delays associated with rejected applications.
Manaaina the Permittina Process
Many of the assignments in this contract will require several permits in accordance with the requirements of the
agencies with jurisdiction in the area where improvements are being performed. Members of Bee's staff have
demonstrated during the last five years, our capability of obtaining permits for this type of project, one example is a
recently completed project. This project was the Miscellaneous Sanitary Sewer Improvements for MD Parks and
Recreation Department: coordination and approval included MDWASD, MD Public Works, DERM, FOEP, FPL, NUl City
Gas and Miami-Dade County Building & Zoning.
Manaaina Contractors Submittals and RFl's
Construction administration procedures are office administration activities related to the project construction. A
representative of Bee will be available for all construction related matters, and this person will have the authority to
make decisions on behalf of the design team. The following is a list of the administrative procedures performed,
followed by a short description of the task.
. Pre-eonstruction Conferences, when an initial Notice to Proceed is issued. This allows the contractor a set
period of time, usually 30 days, to finalize the construction schedule and obtain all permits. A final Notice to
Proceed is issued once the permits and schedule are ready and approved by the agencies.
· Weekly Meetings are set up to review the status of construction progress, submit shop drawings, clarify
documents and discuss construction issues.
· The following support documents are sent to the City's Project Manager who may consult with Bee before
responding to the request. All transactions are logged. Documents processed will include: RFI's, Change
Orders, Request for Proposal's and Field Orders.
41page
.Ltt-s CITY OF SUNNY ISLES BEACH W1..",
Construction Contract
A project's close-out phase is often overlooked in the execution of the project. Project teams usually move on to the
next engagement, and the City is left with completing the final deliverables and financial obligations. In some cases,
the project close-out can have serious financial considerations related to issues of contract and schedule closeout.
When a project is approximately 90% complete, BCC's Engineers will contact the Contractor as well as the City's
Maintenance Staff to schedule a Preliminary Field Inspection. Although this inspection may not be a requirement of
the contract documents it is suggested in the spirit of cooperation with the contractor to insure a timelier and
problem free final inspection. The purpose of the inspection will be to review the project and determine if the
project is sufficiently complete to warrant a final inspection. Bee will schedule a Final Inspection within 7 days of the
Contractor notifying the City that the project is presumptively complete. During this inspection a punch list will be
prepared for any work found unsatisfactory in whole or in part. A copy of the punch list will be provided to the
Contractor with the indication that the work so noted must be completed before the job will be accepted. The
eontractor will also be notified that the punch list should not be construed as a "final list".
Once all punch list items are completed, a Final Inspection will be scheduled. Contract closeout will also include
reconciliation of any outstanding unpaid estimates, review of the required contract documents, and submittal of the
appropriate records including "As-Built" Plans to the City for records retention.
Project Team and Staff
Throughout the years Bee has forged an outstanding reputation for providing quality services that meet client needs
and exceed expectations. Our firm has the ability and the technical resources to provide the majority of the services
requested in the City's RFQ. The firm principals and staff have the depth of knowledge and experience the City is
looking for in its consultant. Bce has a total of 69 employees that are trained to provide sound engineering solutions
in a professional and cost-effective manner.
Proiect Staffina
General Engineering Services Agreements require a Project Manager (PM) with proven design experience that will
manage each individual assignment, deliver them on schedule, and is familiar with local Standards, Specifications
and Procedures. BCe's Project Manager will be Mr. Shahin Hekmat, PE, his experience, as well as the experience of
the key members of our Team, similar projects and client reference information is documented in the attached
Standard Forms 330.
In assembling the staff, we not only looked at the special technical capabilities of each individual, but also their
current and projected workload and availability. The staff being proposed to the City will be committed to for the
duration of the contract. Bee Team member's current workload ensures that we can easily provide the staff-hours
required to service this contract.
Praiect Manaqer
Shahin Hekmat, PE will be the overall project manager and the point of contact with the City of Sunny Isles Beach.
Mr. Hekmat had been involved in many projects with the City in the past and was part of the team that prepared the
City's Capital Improvement Plan (CIP) and the associated budget in 2007. He is a seasoned Senior Civil Engineer with
expertise in storm water management, drainage and roadway design, land development projects; including design
of water distribution systems, sanitary sewer collection and disposal systems, paving, grading, drainage and flood
routing analysis, permitting, construction oversight, and project close-out.
Mr. Hekmat's career has been focused on the design of public infrastructure projects for municipalities, counties and
state agencies, in South Florida. He has a reputation for getting things done professionally and efficiently. He Served
as City Engineer for City of Weston; Consulting Engineer for the Cities of Sunny Isles Beach and North Lauderdale;
and District Consultant for South Broward Drainage District, Indian Trace Development District, Bonaventure
Development District and North Lauderdale Water Control District. This combination of energy and experience is
what Mr. Hekmat will bring to each and every assignment the City of Sunny Isles Beach tasks us with under this
contract with the help of our Team as identified in the Organizational Chart.
5lpage
6~ CITY OF SUNNY ISLES BEACH RL",
~ CITY OF SUNNY ISLES BEACH
Jose A. Munoz, PE
Luis Tellechea
61Page
~
Ltf2 CITY OF SUNNY ISLES BEACH ~O~Og
Proiect Manaaement
The key to the success of this contract hinges on the Project Manager. As the Project Manager, Mr. Hekmat will
deliver a successful project to the City on each and every task work order by:
· Committing highly competent and experienced professionals to projects and providing them with the
necessary resources to assure success.
· Utilizing project management tools such as Primavera and Deltek Vision to assure projects are on time and
on budget.
· Continuous communication with the City's Project Manager to ensure expectations are being met and
information is being delivered between parties.
· Taking a proactive approach that emphasizes the early resolution of project issues and a philosophy focused
on providing value added services.
Our Project Management Approach is to establish the project requirements; set the basis
for controlling scope, schedule, and budget of the project tasks; and describe the principal
responsibilities and authority of the project participants. At Bee we understand the
necessity of successfully completing project goals within the predetermined schedule and
work program budget. Bee will develop a set of contract documents that will be
functional, cost effective, biddable and maintainable. We will use a "hands-on" Project
Management approach to effectively complete the contract. Our streamlined production
oriented team, along with state of the art resources allows us to complete project assignments on record time with
a high level of technical proficiency and professional quality. Upon receipt of a request for services, Bee will
schedule a meeting with the City's Project Manager to discuss the proposed scope of services and will schedule a
field visit to fine tune the scope of services. The initial field review will include video taping/pictures of existing
conditions to help define project issues and deficiencies. After the field meeting, the Bee Project Manager will
coordinate with the City's Project Manager to finalize the scope. Described below is a set of management activities
that we will deploy to manage work orders assigned to Bee under this contract.
Proiect Kick-Off Meetinq
We will begin with a kick-off meeting to identify the key project issues, team participants,
discuss project purpose and goals, define team member roles and responsibilities, and
identify expectations. The planning and scheduling of the kick-off meeting will be
coordinated through the City of Sunny Isles Beach Project Manager.
Proiect Reportinq
Bee will distribute meeting minutes within 3 working days of the conclusion of any meeting. Action items resulting
from the meeting will be identified, including a responsible individual for the action and a date when the action is to
be completed. Action items will be entered into a tracking database and will be reviewed by the Project Manager on
a weekly basis.
Monthly status reports will include cost and schedule updates, variance analyses, recommended corrective actions,
and updated forecast. The status report will also include an executive summary with narratives regarding the
accomplishment for the month, projected activities for the following month, and identification of issues along with
suggested approaches and resolutions.
Project Schedule
The Bee Team will develop and present a project schedule as part of any proposal to the City and with input from
the City's Project Manager, further detail the schedule and develop logical and achievable tasks. Throughout the
project we will continuously review and update the schedule.
Staff Availabilitv
Bee Team member's current workload ensures that we have the resources to effectively carry out assignments
under the General Engineering Services contract. A representation of key team member's current job commitment
7lpage
.Ltf~ CITY OF SUNNY ISLES BEACH g,;~c<
and availability is presented below. We should point out that our resources are greater than those shown here; we
are only showing a fraction of our staff. Should any assignment require additional resources, we have the capability
to re-allocate staff to accelerate a particular design schedule.
Cl;.J'I(:.I.f1l Cl::iI:I{:nn ~'1I1..1I
~:.Ii,1mJ? ta.] 11111 ftn:rll ~ ~1tiJ8:w ~
\1*l.m:.l/R;r:l
Jose A. Munoz 80% 20% 2,080 416
Shahin Hekmat 45% 55% 2,080 1,144
Luis Tellechea 50% 50% 2,080 1,040
Juan Fuentes 70% 30% 2,080 624
Felix Diaz 40% 60% 2,080 1,248
Manuel Benitez 70% 30% 2,080 624
Daniel Raymat 60% 40% 2,080 1,248
Ariel Millan 75% 25% 2,080 520
Elia Nunez 55% 45% 2,080 936
Ivonne Planas 50% 50% 2,080 1,040
Ricardo Ayala 50% 50% 2,080 1,040
Luis Rodriguez 75% 25% 2,080 520
Dacha Quintana 55% 45% 2,080 936
Sung-Ryong Han 70% 30% 2,080 624
William Garcia 80% 20% 2,080 416
Frank Junco 60% 40% 2,080 1,248
Luis Eduardo Jimenez 60% 40% 2,080 1,248
Total 14,872
We have calculated a total of 14,872 hours of staff availability within the next year. We realistically feel that these
resources are more than sufficient to carry out any assignments under this contract. However, since a definite
project scope has not been defined at this point, we can only estimate as to the total hours required to service this
contract.
Budqet Monitorinq and Control
Bee will develop and implement a Work Breakdown Structure (WBS) based on a logical
organization of the work with the flexibility to adjust to the evolution of the project. The WBS will
include all tasks and any overall management tasks, but will be primarily directed towards
deliverable products. The WBS will form the basis for identifying schedule activities and
monitoring cost.
We will also develop standard cost control reports for every level of the WBS, consistent with the schedule and will
track original budget, earned value, approved changes, current budget, current expenditures, estimate to complete,
pending changes, and anticipated changes. The cost reports will compare planned versus actual expenses and will
identify variance at the cost account level.
Quality Assurance / Quality Control
Because errors and omissions can have a long-term effect on a company's reputation, we place a great deal of
importance on our quality assurance program. A quality product must meet the owner's requirements and
8lPage
Ir CITY OF SUNNY ISLES BEACH RLco
Request for Qualifications No. 10-04-01 · Professional Engineering Services
expectations which include being on time and within budget. A continuous quality control process goes a long way
in identifying key issues.
As the consultant, Bee Engineering will have a responsibility to ensure that the design and construction documents
meet the highest possible standards for accuracy and completeness. In order to ensure we meet these high
standards, our quality assurance manual documents detail checking procedures, and place an emphasis on
continuous monitoring, coordination, communication, review and checking.
Bee Engineering will also prepare a project-specific Quality Control Plan that will define QC
personnel, their roles, schedule and review requirements. Committing the appropriate staff to
the QC team is essential, and the team will be composed of a group of professionals that are
highly skilled in their areas of expertise and are completely independent of the design team.
Their reviews will be separated into three major areas:
· Review of the engineering design and criteria,
ChKkHt- Oat..
· Review of the plans preparation including that component sets have been properly ~~.r~~~~.~~::::===
V,ffifieod: -Date:
coordinated, and
· Constructability reviews.
Prior to any submittal to the City of Sunny Isles Beach, documents will be reviewed as follows:
· Documents are stamped as ready for review and forwarded to reviewers specified in the QA/QC plan.
· After QA/QC reviews, mark-ups and comments are sent back to the designer/originator.
· Designer reviews, comments and develops responses.
· Designer and reviewer meet to agree on implementation of comments.
· Any disagreements are forwarded to the QA/QC officer for resolution.
· Comments are implemented and back checked.
All QA/QC documents will have a tracking stamp applied to them and will be initialed and dated by the responsible
professionals. QA/QC documents will be retained in our offices and will be made available to the city if requested.
Experience on Similar Proiects
~
Quality Control
RECORD DOCUMENT
Bee OU"llTY DRIVEN
-..
The following is a partial list of BCC Engineering projects. All of the projects presented were chosen because they
depict relevant experience which can be directly applied to the City of Sunny Isles Beach Professional Engineering
Services Contract.
General Engineering Services City of Miami, Miami-Dade County, Florida - BCC Engineering was selected to provide
General Engineering Services for the City of Miami. Some of the Assignments completed under this contract were:
· San Marco Island Roadway and Drainage Improvements
· NW 7th Street and NW North River Drive Greenway design, and
· NW South River Drive Greenway design
Project Manager: Jose Lago, P.E.
E-Mial: JLago@ci.miami.jl.us
Contact Number: (305) 416-1252
MD Water and Sewer Department General Engineering Services, Miami-Dade County, Florida - BCC Engineering
was selected to provide engineering services to WASD. Some of the Assignments completed under this contract
were:
· City of Miami Undersized Water Main Replacement
· Miami Shores and EI Portal Undersized Water Main Replacement
· Pump Station Rehabilitation and Force Main Extension
Project Manager: Felix Valdes
E-Mail: FValdes@miamidade.gov
Contact Number: (786) 552-8263
91Page
LIf~ CITY OF SUNNY ISLES BEACH Rl~",,"g
District-wide Minor Design for Consultant Management, FDOT District 6, Miami-Dade/Monroe County, Florida -
BCC was selected for a General Engineering Services contract for Roadway Improvements by Florida Department
of Transportation District VI, a two year contract with a total compensation $1.5 million with multiple work orders.
Assignments completed to date have included:
· Milling and Resurfacing and ADA improvements for a one mile segment of Normandy Drive, and
· Traffic Signal Improvements to ten Signalized Intersections along NW/NE 167th Street
Project Manager: Jason Chang, PE,
E-Mail: Jason.chang@dot.state.fl.us
Contact Number: (305) 470-5471
District-wide Planning and PD&E Consultant, FDOT District 6, Miami-Dade/Monroe County, Florida - BCC
Engineering is under contract to FOOT District VI as the Prime Consultant to provide Miscellaneous Engineering
and Environmental Studies for the District's Environmental Management Office. Services have included:
· Preparation of Preliminary Plans and Supporting Engineering and Environmental Documents
· Traffic Data Collection and Modeling
· Providing In-House Support Staff
· Plans Review
· GIS Programming and Support
· 3-D Modeling, Real Time Simulation and Virtual Reality Programming
Project Manager: Kenneth Jeffreies
E-Mail: Ken.jeffries@dot.state.fl.us
Contact Number: (305) 470-6736
MDX General Engineering Consultant, Miami-Dade County, Florida - BCC was selected to provide construction
phase services to Miami-Dade Expressway Authority for system wide improvements. Responsible for the review of
structural shop drawings, product approvals, and repair recommendations for projects under construction,
including:
· Girder Erection Plans and Steel Repair Plans for Steel Box Girder Bridges on the SR 836 Extension
· Toll Plaza Structures and Sign Structures for the SR 836 WB Toll Plaza
· Miscellaneous Bridge Joint Repairs
· Bridge Painting and Concrete Repairs for SR 836 over the Miami River, and
· Steel Box Girder Bridge, Noise Barrier Walls, and Retaining Walls for the SR 874 / Kendall Drive
I ntercha nge
Project Manager:
E-Mail:
Contact Number:
Alfred Lurigados, PE
(305) 637-3277
alurigados@mdx-way.com
Countywide Construction Engineering & Inspection Services, Miami-Dade County, Florida - BCC provided contract
administration, and CE&I for Countywide Construction Projects. Services provided included:
· Provided field inspectors for Secondary Canal clean-up,
· Provided inspectors for Canal Bank Restoration,
· Provided inspectors for Beach re-nourishment projects, and
· Provided staff for contract administration services including review of contractor invoices for payment
Project Manager: Alex Hernandez
E-Mial: AHernandez@miamidade.gov
Contact Number: (305) 372-6789
10lPage
State of Florida
Department of State
I certify from the records of this office that BCC ENGINEERING, INC.
is a corporation organized under the laws of the State of Florida, filed on
March 18, 1994, effective March 15, 1994.
The document number of this corporation is P94000022294.
I further certify that said corporation has paid all fees due this office
through December 31, 2010, that its most recent annual report was filed
on January 5, 2010, and its status is active.
I further certify that said corporation has not filed Articles of
Dissolution.
Given under my hand and the Great Seal of
Florida) at Tallahassee) the Capital) this the Sixth
day of January) 2010
~vtS
Secretary of State
Authentication ID: 500164581635-010610- P94000022294
To authenticate this certificate, visit the following site, enter this
ID, and then follow the instructions displayed.
https:ffefile.sunbiz.orgfcertauthver.html
ARCHITECT - ENGINEER QUALIFICATIONS
PART 1- CONTRACT SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (City and State)
Professional Engineering Services
City of Sunny Isles Beach, Miami-Dade County, Florida
2. PUBLIC NOTICE DATE
3. SOLICITATION OR PROJECT NUMBER
May 26, 2010
RFQ No. 10-04-01
B. ARCHITECT - ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Jose A. Munoz, P.E.
5. NAME OF FIRM
BCC Engineering, Inc.
6. TELEPHONE NUMBER
(305) 670-2350
7. FAX NUMBER
(305) 670-2351
C. PROPOSED TEAM
8. E-MAIL ADDRESS
JMunoz@bcceng.com
(Complete this section for the prime contractor and all key subcontractors.)
(Check)
0::: '0:::
W W Zo 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
~ >Z 01-
~ ,I- Uu
'0::: COe:(
(L e:( ::Jo:::
(L (/)1-
X BCC Engineering, Inc. 7300 North Kendall Drive · Structural (Building and Bridge)
Suite 400 · Traffic
Miami, Florida 33156 · Construction Management
· Construction Inspection
· Hurricane Recovery and debris
monitoring services
· General Design Work (Civil)
· Preparation of complete
a. Construction Contract Plans and
Special Provisions for the
assigned Project.
· Post Design Services (Shop
Drawing Review and Responses
to Request for Information)
· Bid Administration (Selection
o CHECK IF BRANCH OFFICE and Letting)
b.
o CHECK IF BRANCH OFFICE
c.
o CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM
o (Attached)
STANDARD FORM 330 (6/2004) PAGE 1
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 6/2004
12. NAME
Jose A. Munoz, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Principal-in-Charge
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
14
5
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
B.S.C.E., Florida International Univ., 1997 Professional Engineer, Florida #58714
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards, etc.)
Certified Plumbing Contractor: Florida - No. CFC054874
Certified General Contractor: Florida - No. CGC060630
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-826 Palmetto Expressway Improvements - Section 5 Design-Build, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Miami-Dade County, Florida, FOOT District 6 2009-2012 2009-2012
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE It! Check if project performed with current firm
a. Project Manager for the reconstruction of SR-S26 from south of Flagler Street to north of NW lih Street and SR-S36 from
east of NW sih Avenue to west of 5ih Avenue. The SR-S26 / SR-S36 Interchange is a 4-level System-to-System Interchange
with direct connectors that provide for traffic movements in all directions between the two expressways. The project also
includes the reconstruction of two service interchanges, the reconstruction of NW lih Street and the realignment of the
North Line Canal. The project includes 47 new bridge structures (4 Concrete Segmental Flyovers, 7 Steel Plate Girder, and 36
FIB) as well as an extensive amount of permanent and temporary walls, and sign structures.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Homestead Extension of Florida's Turnpike PD&E Study from SR874 PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
to SR836, Miami-Dade County, Florida, Florida's Turnpike Enterprise 2006 N/A
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE It! Check if project performed with current firm
Project Engineer responsible for the development of interchange concepts for the Kendall Drive Interchange with the HEFT.
Responsibilities also include, providing a safety analysis and operational analysis for the corridor.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miscellaneous Civil Engineering Services, Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2005 N/A
(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE It! Check if project performed with current firm
c.
Project Manager responsible for the coordination, design, permitting, and preparation of construction documents for
multiple projects for Miami-Dade County Parks and Recreation Department. Assignments included improvements to waste
water collection systems at Tropical Estates Park, Devonaire Park, Sgt. Joseph Delancey Park, Continental Park and Ron
Ehman Park. Improvements included the design of gravity sewers, force mains and pump stations.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Districtwide PD&E Consultant, Miami-Dade and Monroe Counties, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Florida, FOOT District 6 2007 N/A
(3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE It! Check if project performed with current firm
d.
Project Manager for General Engineering Consultant for preliminary engineering/project development services throughout
District 6. Task orders to date have included safety and operational evaluations of the South Dade Busway at-grade
intersections, the replacement of the NW 5th Street bascule bridge over the Miami River, and the addition of auxiliary lanes
along 1-95 from NW 125th Street to NW 151st Street in Miami-Dade County.
STANDARD FORM 330 (6/2004) PAGE 2
12. NAME
Shahin Hekmat, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Project Manager
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
21
1
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
B.S.C.E., University of Miami, 1999 Professional Engineer, Florida 49941
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, etc.)
Advanced Work Zone Traffic Control (Feb 2012) PSMJ Project Management Boot Camp I
FDEP Storm Water, Erosion, and Sediment Control Inspection Training Environmental Permitting Summer School
FES Storm Water Management Design AdlCPR Hands-on Training
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
South Dade Regional Water Reclamation Plant - Task 4, Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
County, Florida 2008 - on going 2014
(3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE iii Check if project performed with current firm
a. Project Manager to provide services including the identification of all the Federal, State and Local regulatory requirements for
the project. In addition to the permit requirements of each agency, guidance to facilitate and expedite the review process was
identified where applicable. Under this Task Preliminary Site Plans were also developed based on process and non-process
building requirements, flood plain criteria, zoning requirements, site drainage and water quality, vehicular access and chemical
delivery needs, parking code, pedestrian and vehicular circulation, nose and site lighting and the overall site security
requirements for a treatment facility.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Construction Engineering Inspection (CEI) of the Sunny Isles Boulevard, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
City of Sunny Isles Beach, Florida 2007 2009
(3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
b. Construction Administrator responsible for the construction oversight of roadway improvements and sidewalk enhancement
to the eastbound SR 826 from intercostal bridge to SR AlA (Collins Avenue). The improvement included the reduction of
existing pavement width from five (5) to four (4) lanes by reconstructing and widening of the sidewalk, milling, resurfacing,
restriped with new pavement markings, replace all signs, install new mast arm for pedestrian crossing mid block, and modify
the signal at Collins Avenue to match the new traffic circulation. Other improvements included new decorative street lights,
paver sidewalk, decorative trash receptacles and benches and landscape improvements.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
City Hall Facility, Weston, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2004 2007
c. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project Manager responsible for the preparation of construction documents and specifications for parking area associated
with the City Hall project, including paving, grading, drainage, water distribution system, sewer collection system, utility
coordination, site lighting, permitting, bid and recommendation of award, construction management and project close-out.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Three Village and Country Isles Roadway Improvements, City of PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Weston, Florida 2004 2007
(3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
d. Project Manager responsible for the a ddition of a 6' bike lane to both sides of Three Village (4,000 LF) and Country Isles Roads
(3,250 LF), new parallel parking, alignment modification along Country Isles Road to improve safety and circulation, removal of
existing swale, construction of curb and gutter and drainage retrofit to eliminate ponding in swales, new sidewalks and brick
paver crosswalks, utility relocation and replacement, landscape adjustment, resurfacing of both street and traffic control
plans. Permitting, bid, recommendation of award and construction management and oversight.
STANDARD FORM 330 (6/2004) PAGE 3
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
12. NAME
Luis Tellechea, Sr.
Cam fete ane Sectian E far each ke
13. ROLE IN THIS CONTRACT
QA/QC Manager
ersan.
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
45
3
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
B.S.C.E., Las Villas University, Cuba, 1965
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards. etc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 826 (Palmetto Expressway) Improvements Program Design-Build PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Project, Section 2, Miami-Dade County, Florida, FDOT District 6 2011 2011
(3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE It] Check if project performed with current firm
a. Project Engineer and QC Manager responsible for the widening and reconstruction of the limited access facility from South
of Sunset Drive to North of Southwest 31st Street and includes the Miller Drive (SW 56th Street), SR 874 and SR 976 (Bird
Road / SW 40th Street) Interchanges. The proposed improvements include the addition of one general use lane in each
direction; auxiliary lanes between all interchanges; interchange improvements and, operational and safety improvements
along the SR-826 mainline and ramps.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Okeechobee Road (SR 25) Depressed Section From W 12th Avenue to PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
W 19th Street, Hialeah, Florida, FDOT District 6 2004 2006
(3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
b. Project Manager for the Florida Department of Transportation overseeing all aspects of Design and Construction for this
one-of-a-kind design-build contract - one of only a few depressed segments of roadway in Florida. The project consisted of
widening and lowering Okeechobee Road in Hialeah from just east of W. 12th Avenue to W. 19th Street under the Florida
East Coast Railroad and Metrorail. The project included installing new drainage - to include a pump system for the
depressed section of the road - street lighting, and pedestrian sidewalk
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
US Route 1 "18-Mile Stretch", Miami, Florida, FDOT District 6 PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2002 On going
(3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
c. FOOT Project Manager responsible for overseeing all the design aspects of this five-section, eighteen-mile rural
reconstruction project. Challenges involve minimizing wetland impacts and maintaining water quality. The project includes
a 65', high-level and a two-mile, elevated causeway over Lake Surprise. The project is highly controversial, which includes
extensive public involvement efforts and requires permits from the U.S. Army Corps of Engineers and the South Florida
Water Management District.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Widening of 4 miles of concrete pavement of 1-95 in Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
County from South of NW 62nd Street to North of NW 125th Street
for FDOT District 6
d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Lead Highway Engineer for the final design of this complex highway improvement project that included widening of several
bridges, lighting, drainage, signing and pavement marking, and several traffic operation improvements along the on/off
ramps and frontage roads. This project also included a very intricate maintenance of traffic scheme to maintain
uninterrupted access to the general purpose lanes of this interstate facility.
STANDARD FORM 330 (6/2004) PAGE 4
12. NAME
Juan Fuentes, P.E., LEED AP
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Structural Engineer, Building
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
10
2
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
B.S.C.E., University of Miami, 2000 Professional Engineer, Florida #62426
B.S.A.E., University of Miami, 2000 Structural Engineer, Illinois #081006736
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
FSEA, AISC, ACI, LEED Essentials
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Continuing Structural Services eontract, Village of Palmetto Bay, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami-Dade County, Florida 2010 I N/A
a.
(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project manager responsible for the structural assignments of the continuing services contract. This contract intends to
Complement the City's existing staff and resources.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Continuing Structural Services Contract, City of Miami, Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
County, Florida 2008 I N/A
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project manager for the structural assignments of the continuing services contract. This contract is used to implement city's
Capital Improvement Program (CIPl.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Continuing Services Contract with the Miami-Dade County School PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
C. Board, Miami-Dade County, Florida 2009 I N/A
(3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Special projects consultant to School Board for miscellaneous structural services
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Open Road Tolling Design Build, Miami-Dade County, Florida, Miami PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Dade Expressway Authority (MDX) 2009 I On Going
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Structural Engineer of Record for new $18M landmark tolling structures for SR 924, 878, and 874. The project included 8
new structures with varying multiple spans of 80'-0" to a single span of 160'-0". Innovative concepts were used to reduce
cost of each gantry. Special attention and detailing was required to meet roadway clearances, vibration, and deflection
guidelines of the system operator. The project also included support structures and repaving of existing highways.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Deering Estate Weir Glade Rehydration Project, Miami-Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Florida 2008 12009
(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
e. Project engineer for the design of a weir structure located on the Deering Estate, immediately adjacent to a historic rock
bridge. The weir consisted of cast-in-place retaining wall with interchangeable wood panels to allow the owner to vary the
amount of water impounded behind the structure. The weir was designed to aesthetically blend in with its surrounding
environment. Consideration of construction methods and equipment was required due to the lack of access to the weir
location and to minimize the damage to the environment from construction activities.
STANDARD FORM 330 (6/2004) PAGE 5
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
12. NAME
Felix Diaz, Ph.D.
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Structural Engineer, Building
erson.
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
32
2
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
Doctorial in Technical Science, Czech Technical University,
Ph.D., 1991
Civil Engineering, Polytechnic University of Havana, 1997
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards. etc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
4041 Warehouse Recertification, Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2009 N/A
a. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE iii Check if project performed with current firm
Project Engineer responsible for inspection, structural calculations and repair details. Details included replacement of the
roof deck.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Downtown Doral Vista Blanca Tower & Vista Blanca Town Homes, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Miami, Florida 2007
(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
b. Project engineer responsible for the design and preparation of construction documents for 19, 15, 11 &, 5 story reinforced
concrete buildings supported on deep and shallow foundations. Shear walls required f'c=7000 psi due to high shear. Special
detailing was required for expansion joint. Provided construction administration services that included responding to
information.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Village at Doral Commercial (Bldg. L-l), Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2006 N/A
C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project engineer responsible for the design and construction documents for 5 story reinforced concrete building supported
on shallow foundations. Provided analysis and design for the gravity and lateral system. Structural design incorporated
elevator and stairs cores as shear walls.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Havana Lofts Condominium, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2005-2006 2006-2007
(3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
d. Project engineer responsible for the design and preparation of construction documents for 15-story reinforced concrete
building supported on shallow foundations. Shear walls required high strength concrete due to high shear. Special detailing
was required for ornamental wall. Provided construction administration services that included responding to contractor
requests for information, shop drawing review and change order requests.
STANDARD FORM 330 (6/2004) PAGE 6
12. NAME
Manuel Benitez, P.E.
Com Jete one Section E for each ke
13. ROLE IN THIS CONTRACT
Structural Engineer, Bridge
erson.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
26
7
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
M.S.C.E., University of Kansas, 1990 Professional Engineer, Florida #45148
B.S.C.E., Purdue University, 1981
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards. etc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-5 (US-1) from M.P. 11.711 to M.P. 13.870, Miami-Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Florida, FDOT, District 6 2006 I
(3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
a. Design Engineer for a two span AASHTO Type II Beam bridge for a wildlife crossing near Everglades National Park in South
Miami Dade County. The bridge consists of two equal spans of 60' -0" for a total bridge length of 120'-0". The substructures
consists of pile bents with 24" prestressed concrete piles. Responsibilities also included approximately 3600' of wrap
around MSE wall at the bridge approaches. Mr. Benitez' responsibilities have included design of the substructure and QA/QC
of the superstructure design and the plans production.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
NW 138th Street Over Miami Canal, Miami-Dade County, Florida, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami-Dade Public Works Department 2006 I
(3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
b. Design Engineer for replacement of an existing prestressed slab unit bridge over the Miami Canal with a new continuous
three span flat slab. The new bridge has three equal spans of 36'-0" (overall length 108'-0") and provides for five lanes of
traffic. The bridge is in a heavily industrialized area and the Miami Canal runs immediately adjacent to Okeechobee Road
(SR 25). The design included curved returns for heavy truck movements and superelevation transitions at the connection
with Okeechobee Road. Mr. Benitez was responsible for QA/QC of the design and Construction Plans.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
HEFT Interchange at NW 74th Street, Miami-Dade County, Florida, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
FDOT Turnpike Enterprise 2005 I
C. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Design Engineer for the widening of a simply supported AASHTO Type IV beam bridge with a span length of 93'-0". The
bridge carried the Turnpike Mainline over the NW 74th Street Canal and the widening was part of the improvements for a
new interchange along the HEFT. Responsible for design of the superstructure and substructure.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
NE 2nd Avenue Over little River Canal, Miami-Dade County, FL, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami-Dade Public Works Department - 2005 I
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
d. Design Engineer for the replacement of an existing bridge over the Little River Canal. New bridge is a continuous three span
flat slab superstructure with an overall length of 84'-0" and equal spans of 28'-0". The bridge was flanked on both sides by
private property which required closely matching the existing profile, a shallow depth structure, retaining walls along the
Little River Canal, and driveway connections on the approach slabs. Proposed intermediate bents were aligned with the
existing supports of adjacent utilities (force mains) at the direction of SFWMD. Right-of-Way Occupancy Permit included
variances for vertical and horizontal clearances.
STANDARD FORM 330 (6/2004) PAGE 7
12. NAME
Daniel Raymat, P.E
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com Jete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Structural Engineer, Miscellaneous
Structures
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
10 6
15. FIRM NAME AND LOCATION (City and State)
8CC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
8.S.C.E., Florida International University, 2000 Professional Engineer, Florida #63111
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR826 (Palmetto Expressway) Improvement Program, Section 2, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Miami-Dade County, Florida, FOOT District 6 2005 2009
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Design Engineer responsible for the design of thirty-two sign structures consisting of span, cantilever, butterfly and bridge
mounted sign structures, and design of sound barrier walls.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR826 {NW/NE 167th Street from North Miami Avenue to NE 10th PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Avenue) Signalization, Miami-Dade County, Florida, FOOT District 6 2008
b. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Design Engineer responsible for the structural design of mast arm structures and foundations for the upgrade of signals at
five signalized intersections. Upgrades consist of replacement of existing span wire signal support with the installation of
new mast arm supported signals including pedestrian signals, vehicle loop detection, and upgrade of controller cabinets
when required.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 112 Toll Plaza Modifications, Miami-Dade County, Florida, Miami- PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Dade Expressway Authority 2006
(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
c.
Engineer of Record for structural design associated with improvements to the SR 112 Mainline Toll Plaza near NW 27th
Avenue. Improvements consist of reconfiguring the existing Toll Plaza to provide an additional manual booth and two
dedicated AVI lanes. Services included the design and plans preparation of new gantry to support the AVI equipment,
modifications to the existing toll plaza canopy and support details for new signage.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-5 (US-1) from M.P. 11.711 to M.P. 13.870, Miami-Dade County, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Florida, FOOT, District 6 2006
d. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project Engineer for a two span AASHTO Type II Beam bridge for a wildlife crossing near Everglades National Park in South
Miami Dade County. The bridge consists of two equal spans of 60' -0" for a total bridge length of 120'-0". The substructures
consists of pile bents with 24" prestressed concrete piles. Responsibilities also included approximately 3600' of wrap
around MSE wall at the bridge approaches.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Ramp 0-1 over NW 74th Street Canal, Miami-Dade County, Florida, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
FOOT Turnpike Enterprise 2005
e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Design Engineer for a simply supported AASHTO Type IV beam bridge with a span length of 93' -0". The bridge is part of the
proposed NW 74th Street interchange project at the HEFT.
STANDARD FORM 330 (6/2004) PAGE 8
12. NAME
Ariel Millan, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Roadway/Highway Design
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
15
5
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
M.S.C.E., Florida International University, 1999 Professional Engineer, Florida #54572
B.S.C.E., Florida International University, 1995 Professional Engineer, Texas #87326
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards. etc.)
Streamline Technology ICPR Hands on Training FDOT Specifications Package Preparation Training
Advanced Work Zone Traffic Control
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 826 (Palmetto Expressway) Improvements Program Design-Build PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Project, Section 2, Miami-Dade County, Florida, FOOT District 6 2011 2011
(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
a. Project Manager and Engineer of Record for the widening and reconstruction of the limited access facility from South of
Sunset Drive to North of Southwest 31st Street and includes the Miller Drive (SW 56th Street), SR 874 and SR 976 (Bird Road
/ SW 40th Street) Interchanges. The proposed improvements include the addition of one general use lane in each direction;
auxiliary lanes between all interchanges; interchange improvements and, operational and safety improvements along the
SR-826 mainline and ramps.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
The Port of Miami Tunnel, Miami-Dade County, Florida, FOOT District PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
6 and City of Miami 2007 N/A
(3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
b. Roadway Engineer responsible for the design of arterial roads, miscellaneous auxiliary structures, conducting traffic analysis,
drainage design and permitting for The Port of Miami Project. The project consists of the construction of a tunnel under
Government Cut Channel to MacArthur Causeway in the middle of Watson Island to improve access to the Port and to
satisfy present and future growing traffic needs of the Port. In addition, the project would eliminate port traffic from the
downtown city area by diverting it more directly to the Interstate highway system.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SW 137th Avenue between the HEFT and US-1, Miami-Dade, Florida, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Miami-Dade County Public Works Department (MDPWD) On-Going N/A
(3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE Check if project performed with current firm
c.
Project Manager responsible for overseeing the preparation of design plans, drainage reports, lighting, signing and
pavement markings and permitting for the improvements to SW 137th Avenue from an undivided two-lane rural section to
a 4-lane section. Design services include planning, traffic operations, roadway, design of a closed drainage system, Signing
and Pavement Marking, signalization, roadway lighting and Public involvement.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SW 268/264 Street Connector Miami-Dade, Florida, Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
County Public Works Department (MDPWD) On-Going
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
d. Project Engineer responsible for all aspects in the preparation of design plans, drainage reports, lighting, signing and
pavement markings and permitting for the improvements to SW 268th Street from a 4-lane undivided section to a 5-lane
section from SW 142nd Avenue to SW 122nd Avenue with a two-way left turn lane and a 4-lane divided section with a
median separator from SW 122nd Avenue to SW 112th Avenue. The project will include curb & gutter, sidewalk (in
developed sections) and bicycle lanes throughout the project limits.
STANDARD FORM 330 (6/2004) PAGE 9
12. NAME
Elia Nunez, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Roadway/Highway Design
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
10
4
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
B.S.C.E., University of Miami, 2000 Professional Engineer, Florida #66276
B.S.A.E., University of Miami, 2000 Professional Engineer, District of Columbia #901940
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.)
Streamline Technology ICPR Hands on Training FOOT Specifications Package Preparation Training
Advanced Work Zone Traffic Control
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 826 (Palmetto Expressway) Improvements Program Design-Build PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Project, Section 2, Miami-Dade County, Florida, FDOT District 6 2011 2011
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Responsible for the preparation of the Typical Section Packages, Pavement Design Packages, Design Variations and Design
Exceptions needed for the project.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
1-75 PD&E Project Study From north of the Homestead Extension of PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Florida's Turnpike (HEFT) interchange in Miami-Dade County to the 1-
595 interchange in Broward County. Miami-Dade and Broward 2007 N/A
Counties, Florida, FOOT District 4and 6
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project Engineer responsible for the drainage master plans and permitting to include the hydrology and hydraulic
calculations; water quality and water quantity permitting calculations; and pre-development and post-development
drainage modeling. The study included alternatives for the possible addition of reversible/special use and auxiliary lanes
and interchange improvements as well as a dedicated transit way adjacent to the highway with stations at appropriate
intervals.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
1-595 eorridor Design Consultant from 1-75/Sawgrass Expressway PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Interchange west of 136th Avenue to 1-95, Broward County, Florida, 2007
FOOT District 4
(3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
c.
Project Engineer responsible for the drainage master plans and permitting to include the hydrology and hydraulic
calculations; water quality and water quantity permitting calculations; and pre-development and post-development
drainage modeling. The project consist of the Widening of 1-595 from the 1-75/Sawgrass Expressway interchange to east of
the 1-95 interchange. The proposed widening will include reversible lanes in the median serving express traffic between 1-75
and 1-95 with direct connections to Florida's Turnpike.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Kendal Drive at SW 99th Court (SR 99) Safety Improvement Project, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Florida, FDOT District 6
(3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
d. Project Manager and Engineer of Record responsible for the development of the roadway plans, signing and pavement
marking plans, pavement design package, design variations and exception packages, and typical section package for the
Kendal Drive at SW 99th Court safety improvement project. The design was to reduce accident frequency at the intersection
based on the safety report. The safety recommendations included reducing the median width, border width and travel
lanes to offset the left-turn bays to improve the alignment and visibility on all approaches and reduce the number of
crashes.
STANDARD FORM 330 (6/2004) PAGE 10
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
12. NAME
Ivonne Planas, P.E.
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Utility Design
erson.
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
13
4
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
BSCE, University of Havana, 1996 Professional Engineer, Florida #67358
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards, etc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami Shores Undersized Water Main Replacement, Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
County, Florida, Miami Dade Water and Sewer Department 2009 2010
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
a. Engineer of Record responsible for the plans preparation and design for the new 8" DIP water main and permitting with
Miami-Dade DERM, Miami-Dade Fire Department and the Florida Department of Health. The Project consisted of the design
of a 2,100 LF of 8" D.I.P. water main in order to replace existing 2", 2y," and 3" mains running within the public right of way
including the installation of fire hydrants, consistent with County requirements and standards. This system was to improve
the water pressure and fire protection capabilities in the residential area.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
10" Force Main along NW 7th Avenue between NW 11th Street and PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
NW 14th Street and along NW 14th Street between 7th Avenue and
Pump Station No.7, Miami-Dade County, Florida, Miami Dade Water 2010 2010
b. and Sewer Department
(3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Engineer of Record responsible for the plans preparation and design of the 10" force main including continuous coordination
with the client/owner, sub-consultants and permitting agencies from the onset of a project through its completion.
Engineering services included Surveying, geotechnical, design limited construction management for approximately 1900 L.F.
of 10" Force Main.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
City of Miami Undersized Water Main Replacement, Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
County, Florida, Miami Dade Water and Sewer Department 2009 2010
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
c. Engineer of Record responsible for the plans preparation and design for the new 8" DIP water main including permitting
with Miami-Dade DERM, Miami-Dade Fire Department and the Florida Department of Health. Project consisted of the
design for the replacement of 5,600 LF of D.I.P. 8" water mains replacing an undersized system. The project also included
the installation of fire hydrants, consistent with County requirements and standards, and water service lines to provide
service to all abutting properties. The upgrades improved the water pressure and fire protection capabilities in the
residential area.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Silver Palms Caribe, Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2004 2005
d. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project Engineer responsible for the development and preparation of the design plans including coordination with the client,
sub-consultants and permitting agencies. Project included design of paving, grading, drainage, 11,600 LF of 8" DIP water
main, 9,000 LF of 8" PVC sanitary sewer, 4,000 LF of 12" DIP force main and a donation pump station for a 38.8 Acre site.
STANDARD FORM 330 (6/2004) PAGE 11
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
12. NAME
Ricardo Ayala, P.E.
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Site Development
erson.
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
11
1
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
B.S.C.E, Colombian School of Engineering, 1999 Professional Engineer, Florida #69950
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc.)
Advanced Work Zone Traffic Control
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Naranja Self-Storage Facility, Homestead, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2008 2009
(3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
a. Project Engineer responsible for design services as well as construction documents for the civil portion of a 4 story self-
storage facility. Design included 650 LF of exfiltration trench, milling & resurfacing SW 272nd Street, a driveway connection
permit for the new driveway abutting US-I, site grading, fire and domestic water services. The project also included
obtaining permits from FOOT District 6, Miami-Dade County Building Department, DERM and acquisition of an
Environmental Resource Permit (ERP) from the South Florida Water Management.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Colonnade, Miami, Florida, Lennar Homes. PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2005-2006 2006-2007
(3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project Engineer responsible for design services as well as preparing construction documents for the civil engineering
b. services for a 570 condominium/apartment units along SW 72nd Ave south of SW 82nd St and north of Snapper Creek Canal.
The scope of work included water, sewer, paving, grading and drainage systems design as well as off-site roadway
improvements associated with a Miami-Dade County section line road as well as pavement marking and signage.
Coordinated all permitting through Miami-Dade County Public Works, Miami-Dade Water & Sewer, DERM and the South
Florida Water Management District and all the utility coordination on the public right-of-way to avoid conflicts within the
proposed layout of the new utilities.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Continental Hotel, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2008-2009 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
c. Project Engineer responsible for civil engineering design services and permitting efforts associated with the redevelopment
of this existing hotel on Collins Avenue in South Beach. Assisted with coordination of coastal construction line permitting,
design of trench drains at drop-off areas, paving grading and drainage around the existing pool area and coordinated with
FDOT with respect to special permit and drainage connection permit. Environmental Resource Permit was required by
FDEP. The project also included the design and coordination of a private lift station.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
University of Miami Merrick and Memorial Building Water Main PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Extension, Coral Gables, Florida 2008 2008
(3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
d. Project Engineer responsible for design services and construction documents for 3000 LF of 12" water main to provide
additional fire protection to the Merrick and Memorial Buildings. The installation of the water main required coordination
with the utility owner and the contractor due to lack of existing utilities information along the proposed layout. Several soft
digs were performed to facilitate the details for any utility conflict so the schedule on the project will not be impacted due
to conflict delays.
STANDARD FORM 330 (6/2004) PAGE 12
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
12. NAME
Luis Rodriguez, P.E.
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Stormwater/Drainage Design
ersan.
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
9
4
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
M.B.A., University of Miami, 2004 Professional Engineer, Florida # 63983
B.S.C.E., Universidad de Los Andes, 1999
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc.)
Advanced Work Zone Traffic Control FDOT Specifications Package Preparation Training
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
San Marco Island, City of Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
On-Going I N/A
(3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project Manager and Engineer of Record responsible for the design of the drainage system and overseeing the plans
a. development for this project. The project involves the drainage analysis and re-design of the drainage system to resolve
flooding issues associated with the San Marco Island, a residential neighborhood in the City of Miami. The drainage design
includes drainage calculations, hydrologic/hydraulic modeling and development of the drainage design plans. The analysis
consists of performing hydraulic calculations for different alternatives for the existing conditions and post conditions using
ADICPR; water quality and water quantity permitting calculations; and pre-development and post-development drainage
modeling. Project included permitting with Miami-Dade County Department of Environmental Resources Management
(DERM) and Florida Department of Environmental Protection (FDEP).
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 76 (Kanner Highway) from Port Mayaca (MP 1.810) to West of SR- PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
710 (MP 9.770), Martin County, Florida, FDOT District 4 On-Going I
(3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Engineer of Record responsible for the drainage design to include the development of a Mini Drip report, swale re-grading,
b. inlet adjustments and resolving erosion issues along the project limits. This 3R project primarily consists of milling and
resurfacing with shoulder widening of State Road 76/Kanner Highway for a project length of 7.96 miles. The typical section
was a rural two lane undivided roadway consisting of two 12' travel lanes and paved shoulders which vary from 2' to 5' with
shallow roadway swales along the outside of the roadway, several cross drains with the ultimate discharge to the St. Lucie
Canal (C-44), located along the north side of the corridor. Engineering Design services include the drainage design analysis
and preparation of the drainage report for the drainage system
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-5/ US-l - From North of Jo-Jean Way to South of Camelot Drive, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Monroe County, Florida, FOOT District 6 I
(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project Manager and Engineer of Record responsible for generating the scoping report based on the evaluation/analysis of
c. the existing corridor, identifying the project needs and providing recommendations based on current FDOT criteria and
guidelines. Project consist of the development of a Resurfacing, Restoration and Rehabilitation (3R) Scoping Report for US-1
from North of Jo-Jean Way to South of Camelot Drive. The project is based on the improvements to the evacuation time for
the Florida Keys to reduce it to less than 24 hours and based on the improvements to the pavement conditions along the
project segment. In addition, report includes an evaluation of the possibility of accommodating a third north-bound lane to
be used during evacuation conditions only.
STANDARD FORM 330 (6/2004) PAGE 13
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
12. NAME
Dacha Quintana, P.E.
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Pavement Marking and Signage,
Channelization
erson.
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
7 5
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
M.S.C.E., Florida International University, 2005 Professional Engineer, Florida #67393
B.S.C.E., Florida International University, 2002
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards. etc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR836/Dolphin Expressway Widening from NW 57th Avenue to NW PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
17th Avenue, Miami-Dade County, Florida, Miami-Dade Expressway 2009
Authority (MDX)
a. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project Engineer responsible for the preparation of a concept report and preliminary roadway plans for the addition of one
auxiliary lane on the eastbound direction from Le Jeune Road/NW 42nd Avenue to NW 17th Avenue and one additional lane
on the westbound direction from NW 27th Avenue to NW 57th Avenue. Analysis entails the development of alternatives to
the SR836/Le Jeune Road Interchange as well as the SR 836/NW 27th Avenue Interchange
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR836/Dolphin Expressway Eastbound Auxiliary Lane, Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
County, FL, Miami-Dade Expressway Authority (MDX) 2007
b. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project Engineer responsible for the preparation of a concept report and preliminary roadway plans for the widening of the
SR-836 mainline in the eastbound direction for approximately 1.3 Miles. Key responsibilities included the development of
the preliminary roadway geometry, preparation of a conceptual drainage report, preparation of a concept report, and
assisting MDX in the preparation of the RFP package.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
General Planning Consultant Support, Miami-Dade County, Fl, Miami- PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Dade County MPO/Parsons Transportation Group 2007
c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project engineer responsible for conducting on-board survey for the 874 Bus on Shoulder Program. For the CSX Study
responsible for the Preliminary Environmental Screening Study for a new CSX rail connection from the Lehigh Spur west
terminus to the Conrad Yelvington Quarry.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Land Development Traffic Study, Miami-Dade County, Fl, Private PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Sector 2007
(3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Engineer responsible for the preparation of Trip Generation and Traffic Study pursuant of Driveway Connection Permit from
FOOT-D6 for the following projects
d. . Chrysler Realty Company, LLC new automobile dealership located on Coral Way and SW nnd Avenue, Miami-Dade
County, FL. The site is a 7.46 acre tract zoned BU-2.
. Sebai Construction new development on a new vacant parcel of land located at 54 NW 8th Street in the City of
Homestead. The proposed development consists of a convenience market of 2,014 square-feet of gross area.
. Pursuant to an FOOT Driveway Connection Permit for the Continental Hotel located at 1825 Collins Avenue, Miami
Beach, Florida 33139; Ms. Quintana performed a Trip Generation (number of vehicular trips per day) Traffic Analysis.
. Traffic Study for the proposed improvements on a vacant lot located at: 28252 SW 158 Ct, Homestead, Florida, 33030.
STANDARD FORM 330 (6/2004) PAGE 14
12. NAME
Sung-Ryong Han
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Traffic Planning and Modeling
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
16
4
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
M.S.C.E., University of Florida, 1998
M.S.C.M., Southern Polytechnic University, 1996
B.S.C.E., Keimyung University (Korea), 1994
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards. etc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Florida Statewide Model Development, Statewide, Florida, FOOT PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Central Office 2004 on going
a. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE Ii'] Check if project performed with current firm
Project Manager responsible for technical/political advices for the Statewide Transportation Forecasting Model
development and coordinating model development for the Florida Statewide Mobility Plan Study.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Statewide Travel Model Conversions, Statewide, Florida, FOOT PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Central Office 2004-2006
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project Manager responsible for converting traffic models to Citilab Cube Voyager Software. Included: FOOT District 1, FOOT
District 3, Treasure Coast Regional Planning Council (FOOT District 4), Central Florida Regional Planning Model (FOOT District
5), Orlando Metro Model, Miami-Dade County Model(Miami, FOOT District 6), and Northeast Regional Planning Model
(Jacksonville, FOOT District 2).
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Northern Homestead Extension of the Florida Turnpike (HEFT) PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
widening, Miami-Dade County, Florida, FOOT Turnpike Enterprise
c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project Manager responsible for overseeing sub-area modeling for a 20 mile section on the Northern Homestead Extension
from SR-836 to the Florida Turnpike, interchange alternative analysis including 1-75, US-27, and new interchange
construction, project demand validation, and Project Development and Environmental project traffic development.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Florida Turnpike Widening, Miami-Dade County, Florida, FOOT PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Turnpike Enterprise
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Project Manager responsible for overseeing sub-area modeling, project demand model validation, and project concept
traffic developments. Preliminary Interchange Modification Reports and Interchange Justification Reports processes and
project feasibility analyses for the interchanges at Clint Moore Road, Yamato Road, and Palmetto Park Road.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
1-75 Express lane Feasibility Project, lee and Collier Counties, Florida, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
FOOT Turnpike Enterprise 2006
e. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Travel Demand Project Manager responsible for subarea/corridor travel demand modeling, concept traffic estimation and
project feasibility assessment of 1-75 Express Lane project based on demand impact analysis, alternative evaluation, toll cost
analysis, and financial feasibility. Responsible for coordination and management of study with Florida Department of
Transportation, District 1.
STANDARD FORM 330 (6/2004) PAGE 15
12. NAME
William Garcia, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Construction Management
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
14
2
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
BSCE, Florida International University, 1996 Professional Engineer, Florida #56781
CTOP ID # G620-920-72-387-0
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, etc.)
Quality Control Manager (CTQP, 2008) Nuclear Gauge Safety Training, (Troxler, 2003)
Final Estimates level I (CTQP, 2008) Stormwater, Erosion and Sedimentation Control Inspector (FDEP,
Advanced Maintenance of Traffic (ATSSA, 2008) 2002)
Consultant CEI Project (FDOT, 2003) New Directions for Florida Post-Tensioned Bridges (FDOT 2003)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
HEFT All Electronic Tolling Phase 1, 2 & 3 Design-Builds, Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
& Broward Counties, Florida, Florida's Turnpike Enterprise 2009 (On-Going)
(3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Senior Project Engineer responsible for the conversion to All Electronic Toll (AET) collection of the four Mainline Toll Plazas
at Bird Road, Homestead, Okeechobee Road, and Miramar plus the 26 Ramp Toll Plazas on the 47-mile long Homestead
Extension of Florida's Turnpike. Improvements included the demolition of the existing canopy, support columns and
concrete island structures within the existing toll plaza cash lanes, widening of the SB & NB HEFT between Bird Road and SR
a. 836, widening and overbuild operations to correct alignment at the plazas, installation of pre-fabricated toll equipment
building structures, installation of steel tri-cord gantry structures for AET tolling equipment, overhead truss and cantilevered
mast arm sign structures, and drainage. Improvements to toll plaza facilities included complete demolition of some plaza
facilities and modification to other facilities including tolling, electrical, mechanical, and other utility systems upgrades,
removal of toll booths and other tolling equipment, and modifications to the access tunnels. Extensive coordination with
two separate Design-Build Teams, FTE Office of Tolls, Raytheon, Toll Plaza Managers and Regional Manager, FTE Traffic
Management Center, and FTE Public Information Office due to extended closures of toll plaza lanes and high volume
maintenance of traffic operations. Project also required extensive involvement during design phase providing
constructability reviews.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Modification of the Bird Road and Homestead Toll Plazas to Open PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Road Tolling Design-Build, Miami-Dade County, FL, FDOT Florida's 2007-2008
Turnpike Enterprise
(3) BRIEF DESCRIPTION (Briefscope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Senior Project Engineer responsible for the conversion of the Bird Road and Homestead Toll Plazas on the Homestead
Extension of Florida's Turnpike to Open Road Tolling Facilities by reconstructing the existing SunPass lanes to high-speed
b. tolling lanes. Improvements included the demolition of the existing canopy, support columns and concrete island structures
within the existing SunPass lanes, asphalt widening and overbuild operations to correct alignment, installation of steel
mono-tube gantry structures for ort tolling equipment, overhead truss and cantilevered mast arm sign structures, and
drainage. Improvements to toll plaza facilities included modification of the electrical, mechanical, and other utility systems,
removal of toll booths and other tolling equipment, and modifications to the access tunnels. Extensive coordination with FTE
Office of Tolls, TransCore, Toll Plaza Managers and Regional Manager, FTE Traffic Management Center, and FTE Public
Information Office due to extended closures of toll plaza lanes and high volume maintenance of traffic operations.
STANDARD FORM 330 (6/2004) PAGE 16
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
12. NAME
Frank Junco
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Construction Administration
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
erson.
21
2
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
Soils Engineering-Surveying-Concrete, Manatee Community CTQP ID # J520256631790
College, 1991
Engineering, Miami-Dade College, 1985
Drafting, Miami lakes Technical Education School, 1983
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards. etc.)
CTQP Final Estimates Level II Radiation Safety Officer Training (Troxler, 2009)
CTQP Final Estimates Levell Stormwater, Erosion and Sedimentation Control Inspector {FDEP,
Intermediate MOT (National Safety Council, 2008) 2002)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 817 (University Drive) from C-13 Canal to C-14 Canal, Broward PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
County, Florida, FDOT District 4 2009-2010
(3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
a.
Contract Support Specialist for the 4.6-mile long milling and resurfacing of University Drive including new signalization at the
intersections of Inverrary Boulevard, Commercial Boulevard, McNabb Road, Springtree Drive, Southgate Boulevard, and NW
44th, 61st, 72nd, 78th, 82nd Streets, including drilled shaft construction and steel mast arm assemblies. New concrete
sidewalks with ADA-compliant ramps, curb and gutter, drainage structures, pavement markings and signing.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Replacement of Jewfish Creek Bridge / Widening of US-1 from Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
City to Key largo, Miami-Dade & Monroe County, Florida, FDOT 2005
District 6
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Contract Support Specialist for the construction of a new 1 Y, miles long high level bridge extending completely over Lake
Surprise. North of the bridge 8 Y, miles of road to be reconstructed with an additional 10 miles and an additional bridge
remaining to the south.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 826 NB /1-75 NB Ramp Widening, Miami-Dade County, Florida, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
FDOT District 6 2004
(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
c.
Contract Support Specialist responsible for the 1.492-mile widening of the concrete segmental bridge ramp connecting
northbound SR 826 to northbound 1-75. Scope of construction includes the first widening of a concrete segmental bridge in
the continental United States, the widening of northbound SR 826 from the NW 122nd Street Bridge to the entrance to the
1-75 exit ramp, and the construction of three reinforced earth walls.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 944 (NE/NW 54th Street) from NW 6th Avenue to Federal PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Highway, Miami-Dade County, Florida, FDOT District 6 2004
d. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Contract Support Specialist responsible for the 1.178-mile milling and resurfacing of SR 944, including signalization, highway
lighting, jack & bore, and 16-inch water main installation for MDWASD.
STANDARD FORM 330 (6/2004) PAGE 17
12. NAME
Luis Eduardo Jimenez
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke
13. ROLE IN THIS CONTRACT
Construction Inspection
14. YEARS EXPERIENCE
A. TOTAL B. WITH CURRENT FIRM
27
2
15. FIRM NAME AND LOCATION (City and State)
BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
Engineering Technology, Hillsborough Community College crQP Training ID # J552525553650
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc.)
QC Manager (CTQP) Final Estimates Levell (CTQP)
Asphalt Paving Technician, Levell &11 (CTQP) Work Zone Traffic Safety Intermediate (FOOT)
Concrete Field Technician, Levell & II (CTQP) OSHA 10 Hour Training
Earthwork Construction Inspection, Levell & II (CTQP) Erosion and Sediment Control Inspector (FDEP)
Drilled Shaft Inspection (CTQP) Nuclear Gauge Safety (Troxler)
Pile Driving Inspection (CTQP)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
HEFT All Electronic Tolling Phase 1, 2 & 3 Design-Builds, Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
& Broward Counties, Florida, Florida's Turnpike Enterprise 2009 (on going)
(3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Senior Inspector responsible for the conversion to All Electronic Toll (AET) collection of the four Mainline Toll Plazas at Bird
a. Road, Homestead, Okeechobee Road, and Miramar plus the 26 Ramp Toll Plazas on the 47-mile long Homestead Extension
of Florida's Turnpike. Duties include daily reporting, inspection and monitoring of drilled shaft and driven pile foundations,
toll equipment gantry structures, overhead and cantilevered sign structures, conduit installation, mainline widening, milling
and resurfacing operations, coordinating lane closures with FTE Traffic Management Center during all lane closures, entering
daily construction reports into Site Manager Construction Program, scheduling the CQC and verification tests and inputting
the information into the L1MS materials database, payment of quantities for monthly and final estimates, and supervising
five field insoectors.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Sawgrass Expressway Smart Highway Project, Broward County, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Florida, Florida's Turnpike Enterprise 2007
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
Senior Inspector responsible for coordinating the inspection and documentation of contractor's activities for the installation
b. of fiber optic cables, dynamic message signs, vehicle speed monitoring systems, and ITS cameras for a 20 mile stretch of the
Sawgrass Expressway from the Sunrise Toll Plaza north to the Mainline of Florida's Turnpike. Duties include daily report and
monitoring of drilled shaft foundations, overhead and cantilevered structures for OMS, conduit installation by directional
bore, fiber optic cable installation, pole installation for VSM, as well as splice vaults, pull boxes, and required hook-ups.
Testing and verification of OMS, VSM and ITS equipment, coordinating lane closures with FTE Traffic Management Center
during all lane closures, entering daily construction reports into Site Manager Construction Program as well as scheduling
the CQC and verification tests, payment of quantities for monthly and final estimates, and supervising two other field
inspectors.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Sawgrass Expressway from Atlantic Blvd to Coral Ridge, Broward PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
County, Florida, Florida's Turnpike Enterprise 2007
(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
c. Bridge Inspector responsible for inspection and documentation of construction activities for the widening of 6 bridges at the
interchanges with Commercial Boulevard, Atlantic Boulevard, and Sample Road. Bridge widening activities included the
construction of spread footer foundations, 3-foot diameter columns, pier caps, and AASHTO concrete beams. Project also
included the installation of sound walls on auger cast piles throughout the project limits. Documentation included entering
daily construction reports into Site Manager, verification test information input into L1MS materials database, scheduling of
inspection personnel and tracking of auantities for month Iv progress and final estimates.
STANDARD FORM 330 (6/2004) PAGE 18
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20, EXAMPLE PROJECT KEY NUMBER
1
22. YEAR COMPLETED
General Engineering Services
eity of Miami, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
June 2008 (On Going)
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
City of Miami Jose lago, P.E. (305) 416-1252
444 SW 2nd Avenue, Miami, Florida 33130 Jlago@ci.miamLfl.us
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost)
BCC Engineering was selected to provide General Engineering Services for the City of
Miami. One of the Assignments completed under this contract was: . '-'.
San Marco Island, City of Miami, Florida
Scope of work consisted of Roadway and Drainage improvements, including regarding
and repair of swales, replacement of damaged sidewalks, curb and gutter, milling and
resurfacing of roadways, construction of new ADA ramps, repair and replacement of
all traffic and street signs.
Engineering services provided included the analysis of alternative drainage
designs/systems that can be used to resolve flooding issues associated with San
Marcos Island. The analysis consists of performing preliminary hydraulic calculations
for each alternative considered using Advanced Interconnected Pond Routing Model
(AdICPR). Once a design alternative was reviewed and approved by the City, a
drainage design including drainage calculations, hydrologic/hydraulic modeling and
drainage design plans was prepared and submitted for approval.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
BCe Engineering, Inc. 7300 North Kendall Drive, Suite 400 Prime
Miami, Florida 33156
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
c. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 19
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20, EXAMPLE PROJECT KEY NUMBER
2
22. YEAR COMPLETED
General Engineering Services
City of Miami, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
April 2010 (on-going)
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
City of Miami Jose Lago, P.E. (305) 416-1252
444 SW 2nd Avenue, Miami, Florida 33130 JLago@ci.miamLfl.us
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost)
BCC Engineering was selected to provide General Engineering Services for the City of Miami. One of the Assignments completed
under this contract was:
Green Way Design for NW S. River Drive, NW 7th Street and NW 11th Ave
BCC Engineering is to provide all project management, engineering analysis and plans preparation services for the proposed Miami
River Greenway Project, including, but not limited to, 1.. E~'
sidewalk reconstruction, coordination with FPL and CIP for
new pedestrian and street lighting, landscape, hardscape . it
and streetscape road reconstruction and/or roadway milling
& resurfacing, drainage improvements as necessary and
pavement striping and signage. The project area includes
NW S. River Drive between NW 12th Avenue and NW 10th
Avenue.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
BCC Engineering, Inc. 7300 North Kendall Drive, Suite 400 Prime
Miami, Florida 33156
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 20
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20, EXAMPLE PROJECT KEY NUMBER
3
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
General Engineering Services, Miami-Dade County Water and Sewer Dept.
Miami-Dade County, Florida
2008 2010
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
Miami-Dade County.WASD Felix Valdes (786) 552-8263
3071 SW 38 Avenue, Miami, Florida 33146 FValdes@miamidade.gov
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
BCC Engineering was selected to provide General Engineering Services for WASD. One of the Assignments completed under this
contract was:
Miami Shores and EI Portal Undersized Water Main Replacement
Scope of Services included the design of 2,200 LF 8" DIP water mains to
replace existing potable water system within the public right of way in the
City of Miami Shore and the Village of EI Portal. The project also includes the
installation of fire hydrants, consistent with County requirements and
standards. This system will improve the water pressure and fire protection
capabilities in the residential area. Responsibilities also include permitting
with Miami-Dade DERM, Miami-Dade Fire Department and the Florida
Department of Health.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
BCC Engineering, Inc. 7300 North Kendall Drive, Suite 400 Prime
Miami, Florida 33156
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 21
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20, EXAMPLE PROJECT KEY NUMBER
4
22. YEAR COMPLETED
General Engineering Services, Miami-Dade County Water and Sewer Dept.
Miami-Dade County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2007 2009
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
Miami-Dade County.WASD Felix Valdes (786) 552-8263
3071 SW 38 Avenue, Miami, Florida 33146 FValdes@miamidade.gov
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
BCC Engineering was selected to provide General Engineering Services for WASD. One of the Assignments completed under this
contract was:
City of Miami Undersized Water Main Replacement
Scope of Services included the design of 6,800 LF of 8" DIP water mains to
replace the undersized mains servicing the Silver Bluff neighborhood within
the City of Miami. The project also includes the installation of fire hydrants,
consistent with County requirements and standards, and water service lines
to provide service to all abutting properties. These system upgrades will
improve the water pressure and fire protection capabilities in the residential
neighborhood.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
BCC Engineering, Inc. 7300 North Kendall Drive, Suite 400 Prime
Miami, Florida 33156
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 22
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20, EXAMPLE PROJECT KEY NUMBER
5
22. YEAR COMPLETED
SW 127th Avenue Reconstruction - from SW 6th Street to NW 12th Street
Miami-Dade County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2006 2008
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
Miami-Dade County Public Works Dept'/ Leandro Ona, P.E. (305) 375-1909
Codina Development LOna@miamidade.gov
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Roadway design for the widening and reconstruction of approximately 1.2 miles of an
urban arterial. Increased capacity was needed along 127th Avenue to provide for
increased traffic generated by new development just north of NW 12th Street. Design
and Construction Plans were prepared as part of a design-build project for the Codina
Development Group on a fast-track schedule. Ultimate typical section is as-lane (4
thru, 1 shared left) curb and gutter section. Roadway design services included drainage
design and permitting, traffic control plans, signing and pavement marking plans,
signalization plans, and roadway lighting.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
BCC Engineering, Inc. 7300 North Kendall Drive, Suite 400 Prime
Miami, Florida 33156
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
c. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 23
F. EXAMPLE PROJECTS WHICH BEST IllUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20, EXAMPLE PROJECT KEY NUMBER
6
22. YEAR COMPLETED
Turnpike Widening - Sawgrass Expressway to Atlantic Avenue Project Traffic
Forecast Development
Broward, Florida
PROFESSIONAL SERVICES CONSTRUCTION (tf applicable)
2008 - 2009
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
Florida Turnpike Enterprise Andrew Velasquez (954) 934-1161
Pompano Operations Center Andrew.Velasquez@dot.stateJl.us
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost
The Florida Turnpike Enterprise (Turnpike) wanted interchange modification
analyses and project traffic forecasts performed for the Turnpike Mainline in
Palm Beach County between the Sawgrass Expressway and Delray Beach (Atlantic
Avenue) using the Southeast Regional Planning Model (SERPM) version 6.5. The
Turnpike's previous studies had shown that improvements to the interchange at
Boca Raton (Glades Road) would have major impacts on the surrounding
commercial properties. BCC Engineering was hired to identify the impact of
constructing interchanges and the widening of the Turnpike Mainline.
After completing a validation of the project area, alternative analyses were
defined base, interim and future year conditions; where interim year socio-economic and roadway structures were calculated
through base and future year interpolation. Alternatives were created for the study area, comprising of no-build, partial and full
interchanges including:
· No Interchange - No new interchanges at Clint Moore, Yamato Road or Palmetto Park
· Build Alternative 1 - Full Interchange at Clint Moore
· Build Alternative 2 - Partial Interchange to/from the north at Yamato Road and to/from south at Clint Moore Road
· Build Alternative 3 - Full Interchange at Palmetto Park Road
The BCC team analyzed the study area to produce documentation that included regional impact for each of the alternatives, mode
choice summaries, and model volumes for the study area. Complemented with a high level of Quality Control and Assurance, the
Florida Turnpike Enterprise was pleased with the results.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
BCC Engineering, Inc. 7300 North Kendall Drive, Suite 400 Prime
Miami, Florida 33156
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
c. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 24
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20, EXAMPLE PROJECT KEY NUMBER
7
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Countywide CEI Services
Miami-Dade County, Florida
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
Miami-Dade County DERM Alex Hernandez (305) 372-6789
701 NW 1st Court, Miami, Florida 33136 Ahernandez@)miamidade.l!:ov
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost)
BCC provided contract administration, and CE&I for Countywide Construction Projects. Services provided included
· Providing field inspectors for Secondary Canal clean-up,
· Providing inspectors for Canal Bank Restoration,
· Providing inspectors for Beach Renourishment projects, and
· Providing staff to provide contract administration services including review of contractor invoices for payment.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
BCC Engineering, Inc. 7300 North Kendall Drive, Suite 400 Prime
Miami, Florida 33156
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 25
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F
PERSONNEL CONTRACT (Fill in "Example Projects Key" section below before completing table. Place "X"
(From Section E, (From Section E, under project key number for participation in same or similar role.)
Block 12) Block 13) 1 2 3 4 5 6 7 8 9 10
Jose A. Munoz Principal in Charge X X X X X X
Shahin Hekmat Project Manager X X
Luis Tellechea, Sr. QA/QC Manager X X X
Juan Fuentes Structural - Building X X
Felix Diaz Structural - Building X
Manuel Benitez Structural - Bridge
Daniel Raymat Miscellaneous
Structures
Ariel Millan Roadway/Highway X
Elia Nunez Roadway/Highway X
Ivonne Planas Utility X X X X
Ricardo Ayala Site Development X X
Luis Rodriguez Stormwater/Drainage X X X X X
Dacha Quintana Pavement Marking & X X X
Sil!:nal!:e
Sung-Ryong Han Traffic Planning & X
Modelinl!:
William Garcia Construction X
Manal!:ement
Frank Junco Construction X
Administration
Luis E. Jiminez Construction Inspection X
NO.
29. EXAMPLE PROJECTS KEY
TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
Turnpike Widening - Sawgrass Expressway to Atlantic
Avenue Pro.ect Traffic Forecast Develo ment
6
San Marco Island
2
Green Way Design for NW S. River Drive, NW 7th Street
and NW 11th Avenue
Miami Shores and EI Portal Undersized Water Main
Re lacement
City of Miami Undersized Water Main Replacement
SW 127th Avenue Reconstruction from SW 6th Street to
NW 12th Street
7
Countywide CEI Services
3
8
4
9
5
10
STANDARD FORM 330 (6/2004) PAGE 26
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED.
BCC Engineering, Inc. was established in Miami-Dade County as a consulting engineering firm in 1994. Since that time, the firm
has diligently worked to meet the needs of private and public sector clients. BCC Engineering specializes in providing planning,
design and construction management services, provides a broad range of services including civil, water and sewer infrastructure,
structural, transportation design, construction engineering and inspections (CEI) services, drainage and environmental permitting,
signalization design, lighting design and traffic engineering services.
PROFESSIONAL STAFF
BCC Engineering has the resources and experience to carry out any assignment. Our engineers are leaders in the Florida
consulting industry and the staff has all the requisite skill sets needed to assure success on a project. BCC Engineering's in-house
design staff totals sixty-nine (69), including eighteen (18) registered Professional Engineers, twelve (12) Engineers in Training (EI's)
and two (2) LEED<'l> Accredited Professionals. Staff is fully equipped with state of the art computers, plotters, printers, scanners,
and design software. BCC is up to date with the latest computer software titles such as Autocad, Microstation, AdICPR, Geopak,
Primavera Project Planner, STADD Pro, CONSPAN, MDX, RC Pier and standard Microsoft Office packages. In addition, we are a
fully staffed office with printing and reproduction capabilities; in essence, we do not depend on third parties to produce our
deliverables.
MISSION STATEMENT
BCC Engineering provides responsive, personalized, quality consulting engineering services in order to produce safe and efficient
transportation and engineering systems for our clients and communities.
FIRM EXPERIENCE
An excellent working relationship with our clients and the regulatory agencies has afforded BCC Engineering the opportunity to
continuously work on interesting and challenging projects. Clients have included Miami-Dade County Public Works, The
Department of Environmental Resource Management, Department of Environmental Protection, Broward County, Palm Beach
County, the City of Homestead, City of Miami, Village of Palmetto Bay and the City of Key West.
BCC Engineering has been serving our community for over thirteen (14) years. The following is a list of our current
minority/disadvantaged business enterprise certifications:
· Miami-Dade County - Community Business Enterprise (CBE)
. FOOT - Disadvantaged Business Enterprise (DBE)
I. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
32. DATE
5/21/2010
33. NAME AND TITLE
Jose A. Munoz, P.E., President
STANDARD FORM 330 (6/2004) PAGE 27
ARCHITECT-ENGINEER QUALIFICATIONS
1. SOLICITATION NUMBER (If any)
RFQ No. 10-04-01
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (or branch office) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER
BCC Engineering, Inc. 1994 02-173-5068
2b STREET 5. OWNERSHIP
7300 North Kendall Drive, Suite 400 a. TYPE
2c. CITY 2d. STATE 12e. ZIP CODE Corporation
Miami Florida 33156 b. SMALL BUSINESS STATUS
6a. POINT OF CONTACT NAME AND TITLE Yes
Jose A. Munoz, PE, President 7. NAME OF FIRM (if block 2a is a branch office)
6b. TELEPHONE NUMBER 16c. E-MAIL ADDRESS
(305) 670-2350 jmunoz@bcceng.com
8a. FORMER FIRM NAME(S) (if any) Bb. YR. ESTABLISHED Bc. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c. No. of employees a. c. Revenue
Code b. Discipline (1) (2) Profile b. Experience Index Number
FIRM BRANCH Code (see below)
02 Administrative 7 B02 Bridges 3
12 Civil Engineers 10 C10 Commercial Buildings; Shopping Centers 2
15 Construction Inspectors 8 Cl5 Construction Management 3
47 Planner: Urban/Regional 5 T03 Traffic and Transportation Engineering 2
57 Structural Engineers 12 R06 Rehabilitation (Building, Structures) 2
60 Transportation Engineers 12 S09 Structural Design; Special Structures 2
08 CADD Technicians 14 Hll Housing (Residential, Multi-Family) 1
14 Computer Programmer 1
Other Employees 3
Total 69
11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER
SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million
(insert revenue index number shown at right) 2. $100,000 to less that $250,000 7. $5 million to less than $10 million
a. Federal Work 1 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
B. Non-Federal Work 6 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
c. Total Work "\ 6 5. $1 million to less than $2 million 10. $50 million or greater
~ 12. AUTHORIZED REPRESENT A TIVE
The foregoing is a statement of facts.
a. SIGNev- .... \ V I b. DATE
5/21/2010
c. NAME AND TITLE
Jose A. Munoz, PE, President
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/1/2004
STANDARD FORM 330 (6/2004) PAGE 28
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY
PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
I. This sworn statement is submitted to
by Jose A. Munoz
for BCC Engineering, Inc.
City of Sunny Isles Beach
7300 North Kendall Drive. Suite 400
Miami, Florida 33156
and (if applicable) its Federal Employer Identification Number (FEIN) is 65-054011
(IF the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement:
whose business address is
2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida
Statutes, means a violation of any state or federal law by a person with respect to and directly
related to the transaction of business with any public entity or with an agency or political
subdivision of any other state or of the United States, including, but not limited to, any bid or
contract for goods or services to be provided to any public entity or an agency or political
subdivision of any other state or of the United States and involving antitrust, fraud, theft,
bribery, collusion, racketeering, conspiracy, or material misrepresentation.
3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287 .133(1)(b), Florida
Statutes means a finding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial court of record relating to charges brought by
indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or
entry of a plea of guilty or nolo contenders.
4. I understand that an "affiliate" as defined in Paragraph 287.133(1)( a), Florida Statutes, means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the management of the
entity and who has been convicted of a public entity come. The term "affiliate" includes
those officers, directors, executives, partners, shareholders, employees, members, and
agents who are active in the management of an affiliate. The ownership by one person of
shares constituting a controlling interest in another person, or a pooling of equipment or
income among persons when not for fair market value under an arm's length agreement,
shall be a prima facie case that one person controls another person. A person who
knowingly enters into a joint venture with a person who has been convicted of a public
entity crime in Florida during the preceding 36 months shall be considered an affiliate.
5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes, means
any natural person or entity organized under the laws of any state or of the United States
with the legal power to enter into a binding contract and which bids or applies to bid on
contracts for the provision of goods or services let by a public entity, or which otherwise
transacts or applies to transact business with a public entity. The term "person" includes
those officers, directors, executives, partners, shareholders, employees, members, and
agents who are active in management of any entity.
6. Based on information and belief, the statement which I have marked below is true in a
relation to the entity submitting this sworn statement. (Please indicate which one (1) of the
following three (3) statements is applicable.)
~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(2) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(3) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or agents who are active in management of the entity, or any affiliate
of the entity has been charged with and convicted of a public entity crime within the past 36
months. However, there has been a subsequent proceeding before a Hearing Officers of the
State of Florida, Division of Administrative Hearings and the Final Order by the Hearing
Officer determined that it was not in the public interest to place the entity submitting this sworn
statement on the convicted vendor list. (Attached is a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS
FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH
DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE
PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY
PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD
AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE
CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED IN THIS
ORM.
Jose A. Munoz
(Printed or Typed Legal Name of Affiant)
State of Florida
Miami-Dade
Sworn to and subscribed before me this 20th
day of
May
,2010 by
Typed
~.,.y Pll~ Notary Public Slale,Qf Flqrida
! ': SusanWmary :seal:
~ C ," I My Commission 00661540
"'0,,,0 Expires 04/10/2011
Susan Alfonso
Personally Known:
x
or Produced Identification
Identification Produced N/A
NON-COLLUSIVE AFFIDA vIr
State of Florida )
County of Miami-Dade
Jose A. Munoz
being first duly sworn, deposes
and says that:
(I) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully informed respecting the preparation and contents of the attached Bid and
of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded, conspired,
connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a
collusive or sham Bid in connection with the Work for which the attached Bid has been
submitted; or to refrain from bidding in connection with such Work; or have in any manner,
directly or indirectly, sought by agreement or collusion, or communication, or conference with
any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or
to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder,
or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage
against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any
other of its agents, representatives, owners, employees or parties in interest, including this
Affiant.
Jose A. Munoz
(Printed or Typed Legal Name of Affiant)
State of Florida
County of Miami-Dade
Sworn to and subscribed before me this 20th
day of
May
,2010 by
Jose A. Munoz
Susan Alfonso
~...9.Y Pl.l~
~o 1:"...:
'.\ ':
"'? 0;'" f"'~~
Notary Public State of Florida
Susan Alf~ot 5;: ,aJ:
mission B5\36i54U
Expires 04/10/2011
Personally Known:
x
or Produced Identification
Identification Produced
N/A
Addendum No. 1
CITY OF SUNNY ISLES BEACH
RFQ NO.1 0-04-01 - Professional Engineering Services
RFQ NO. 10-04-02 - Professional Architectural Services
To All Bidders:
Bidders for the above-referenced projects shall take note of the following changes,
additions, deletions, clarifications, etc. to the Plans and Specifications, which in
accordance with the Contract Documents shall become a part of and have precedence
over anything shown or described otherwise.
1. Mandatory Pre-Submittal Conference Minutes (Q&A) May 5, 2010.
2. Sign-In Sheets from Mandatory Pre-Submittal Meeting.
Addendum No.1 Mandatory Pre-Submittal Conference QA OSOS10Page 1 of 6
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
Mandatory Pre-RFQ Submittal Conference Summary Minutes
Wednesday, May 5, 2010 at 10:00 a.m.
RFQ No. 10-04-01, Professional Engineering Services, and
RFQ No. 10-04-02, Professional Architectural Services
City Manager Rick Conner welcomed everyone and asked everyone to be sure to sign the Sign-In
sheet that is going around as this is a mandatory meeting. Assistant City Manager/Services Jorge
Vera, Assistant City Attorney Fernando Amuchastegui, and Assistant City Clerk Mauricio Betancur
were also in attendance. The deadline for submission of Request for Qualifications documents is
Wednesday, May 26, 2010 at 2:00 p.m. for RFQ No. 10-04-01 (Engineers) and at 2:30 p.m. for
RFQ No. 10-04-02 (Architects), at which time those sealed responses will be publicly opened.
Any additional questions are required to be in writing and may be submitted up to seven days before
the opening (at the close of business, Wednesday, May 19, 2010), which will be answered and placed
on Demand Star. You may email themtoCityManagerRickConner.atrconner@sibfl.net. or fax
them to 305-792-1561.
City Manager Conner said we are looking for a very brief response, which is the reason for the 10-
page limit. If you can't tell us in 10 pages why you are a good firm for our needs, you missed the
point, we are not looking for fluff. He said that the people who will be looking at these responses,
have technical backgrounds. He mentioned that if you think about the mechanics, we have to go
through all of these, and there are about 80 people in the room, and those people who get to the point
and sell us immediately, are the ones we will be impressed with and pay a little more attention to.
The 10 pages are a description to the City of what services you can provide, you do not have to
provide all services, we are not looking to select a firm that can do everything. Tell us that you do
geotechnical, structural, etc., tell us how you do it well, and there will be multiple firms approved.
When we have projects that fit those categories, we don't have to go through a long RFQ process just
for a small project. If you can't handle a small job and give us response that shows you care about
our City as a client, that is fine. If you have other big clients somewhere else take care of them, but
we want somebody that is looking out for us. This is sort of that little test process that says you are
interested in the City, you are willing to come here to the City and give us great service on our
projects, get us through them, and then we move forward with you on to the next one. That is what
we are looking for, you do not have to submit as a complete umbrella firm. A lot of people have
asked if they should get subs, no, please don't, we want to know what you do, and we will select
firms based on our needs, and who can fill those needs. When we have a specific large project it will
go through a separate stand-alone RFQ process.
Mr. Conner said that you can substitute Form 330 for the 254 and the 255, and it does not count
toward your ten pages. The required backup documents do not count toward the ten pages, but your
firm, your people, what you are going to do for us, that is the ten pages, and then if we need to verify,
the backup is there. Weare not going to automatically read those forms, but if we think a firm really
Addendum No.1 ManwlOry Pre-Submittal Conference QA OSOSlOPage 2 of 6
meets our qualifications, then we will dig deeper and look into those forms.
QUESTIONS AND COMMENTS FROM PROSPECTIVE BIDDERS
1. For the lO-page limit, the business financial statements and annual revenues, would that be
counted towards it?
No. The financial statements are also not part of the ten pages.
2. What format do you want it in?
How you make your presentation is up to you, you know best how to sell yourselves.
You know what your skills are, you know what is going to make the best impression on
us. We want to use the free-form approach because it gives you a chance to shine. If
we give you a very particular format, it may not give you a chance to show us what you
can really do, and we don't want to limit you, so whatever is best for you, please use
that approach.
3. How many firms will you be selecting?
We don't know. If it takes 20 firms to give us the opportunities that we need, it will be
20 firms. If three firms cover it, it will be three firms. Last year we selected two
architectural firms, an d one of them did a small project and did not satisfy the City, the
other firm did very well. The firm that did well picked up other small projects and are
now doing larger projects.
4. Can we create our own 330 Form?
No. Please use the existing forms so there is consistency.
5. If you are selected as one of the companies on this list, are you prohibited from submitting on
the larger projects that the City undertakes?
Absolutely not. Again, this is kind of that chance for the City's benefit, this process
serves two purposes: 1) we have got a list of people that have gone through the process,
and in this City we like things done quickly, that is the driving force here. That is
what we will be looking for, how quickly you react and give us services, and so this is a
great opportunity for us to get jobs done quickly because all the legal processes have
been accomplished and we can get on with doing the job; and 2) again, it gives us a
chance to see who is going to give us better service on the larger projects and so quite
the contrary of eliminating you from the larger projects, it gives you a foot in the door.
This is a golden opportunity to be first up on the list for the larger projects.
6. If you have a project and, we are a Mechanical Electrical Plumbing (MEP) sub-consultant to
an architect or a civil engineer, ifhe is hearing you right, we should submit prime, and let's
say there is an architectural project that does require a sub-consultant, will you put the teams
together?
Typically no, unless it is a small project that we know we can just pull a couple of
people together, knock it out and move on. Anything that has got any real meat to it,
we don't want to force you all into a marriage that may not work, and so we would ask
whoever we select to pick their own people. We might say, here is a list of people that
we have already approved but we would not force it on you.
Addendum No.1 Mandatory Pre.Submlttal Conference QA OSOSlOPage 3 of 6
7. And the architects and civil engineers should not include MEP on their teams?
No, unless you have those in-house services. Again, the idea is: what can you do for us?
If we have a larger project, a bridge for example, we will need structural people,
environmental specialists, etc, and you would go pick the team for that project. For
the small ones, for instance where we just need someone to do another entrance at
Pelican Community Park (PCP), we would pick a consultant from the list to do the
work for us and we are done.
8. On number 6 you are asking for proposed personnel assigned to the City, the City's various
potential projects including their qualifications and experience, is that the resume?
What we are saying is, it doesn't matter if you have all these great people if they won't
be working on our project. What are you going to do for the City with whom, and that
should be in the ten pages.
9. Resumes will not be part of the ten pages, is that correct?
The resumes will be part of the ten pages, if it is part of the 330 or any of the other
required forms, if you have to submit that as part of the backup package for the firm,
that is fine, but what we are looking for in the ten pages is: who are you going to send
to us and tell us why they would be the best person to hire for the job. We are not
looking for the firm name, we are not looking for the national offices, these are one-on-
one issues.
Our approach to this is that when we start, we are a team and we will be there for you
and we want you to be there for us. If you do good work and you support us, we are
the best people on the planet to work for, if you don't we are not. So if you have heard
good or bad things we probably deserve both. If it is a firm that has not given us what
we feel to be good service, then we are tough to work with. If you do a good job, we
will take care of you but it is your response that counts. We can't say that enough, it is
response that counts.
10. Tabs and cover pages do not count on the ten pages?
No, and again, the old joke in English class where the professor threw up the term
papers and the one that hit the floor first was the A, and then he graded the rest of
them on the curve depending on how quickly they hit the tloor. We do the exact
opposite. We have found that people who really know what they are doing and are
really good at what they are doing, can tell you that very quickly. People who depend
on fluff and a lot of verbiage may not be as good at their jobs. We are going to have a
lot of these to go through and we are looking for real service, and again, the people who
are looking at them have a very good understanding of what they are looking for, so
please don't waste your time or ours. Take your ten pages and run them off the Xerox
machine in black and white, the glamour is not what we are looking at. The pretty
covers and pictures are not going to be anything that is considered, it is the text. When
you submit your packages, do not bind them, do not put them in a folder, don't staple
them, just use a clip or binder clip, that makes it easier for us to go through them.
Addendum No.1 Mandatory Pre-Submittal Conference QA OSOSIOPage 4 016
11. With all the attachments that are there too, you want all of those unbound as well, and all one
big clip, or do you want all the financial statements separate, etc.?
Put them all together with a clip, and put the ten pages on the top, and everything that
substantiates it underneath, that way we can quickly go through them, it is a little
easier to store them, etc.
12. There is one original and four copies, and all five are unbound and clipped together, is that
correct?
Yes, that is correct, and then we can hand out those copies to the people who are
reviewing them and then they can go through them very easily.
As a side note, when we did this last time, a lot of firms would call up and say, when do
I get my job. This is not one of those rotation things, what we are looking for are
specific services. If it turns out that we didn't need a structural or a geotechnical that
entire period of time, then we didn't need it. We will use you if we get the chance. It
also tells us that you are a firm that we like, and so when someone submits on a larger
project and they need a structural, and we thought you were a good structural and we
look and see you are a part of their team. That can be a plus, and so it is not a loss
even if we don't necessarily use you under this program.
13. What is the duration of these contracts?
Our desire is to have them go for about two years. We are still working with the City
Attorney's Office on that. We have had that discussion and we will finalize that.
14. Will there be individual negotiations for the fees and the rates?
Yes, obviously your professional services are guided by law, and we will follow those
regulations.
15. Are you going to email out a list of the today's attendees?
We do everything on Demandstar.com, and staff is wonderful about getting the
information posted. They will have the list of attendees and the minutes posted on
Demand Star fairly quickly. Do not call and ask if we have it yet because if it is not on
Demand Star then we don't have it yet. The moment we have it we will post it. Just
keep checking the site.
16. Do you anticipate having any federal funds and do you anticipate to use those through this
contract?
Again, the reason this group is here is for projects that we don't even know we need
yet. If it is a large project, we are going to have a specific RFQ process for that
project. The whole point of this process is that we don't know what is going to come
tomorrow and we want to be try be prepared.
17. Have you received federal funds recently?
We are finishing up a project now on federal funds, but again, those are the larger
projects that we will go out specifically for.
Addendum No.1 Mandatory Pre-Submittal Conference QA 0505 1 OPage 5 of 6
18. How does Demand Star work?
If you subscribe to one municipality you are able to see all the notifications, all the
addendums that are put out by that municipality. There is no fee, however if you want
to register with more than three municipalities, then there is a fee for that. If you
subscribe with this City, the minute we put out the minutes, addenda, etc. you will
receive it within a few minutes of it being posted.
The City has now instituted payment ofinvoices once a week. Again, you are not going
to get rich off of these projects, they will not be coming at you every day, but it is a
great opportunity to get your foot in the door, and show that you are the company that
we want to deal with on a regular basis.
19. Do you have a set cap for the projects that you put under your continued contracts, fee-wise
or construction value wise?
No. We look at the individual project. Some of the little projects that are on that list
have graduated to some fairly hefty projects, but they were the kind of projects that we
just needed this done.
20. What is your typical construction delivery system, at risk, low bid, etc.?
Typically it is a hard bid. Weare not opposed to the Construction Manager At Risk
(CMAR) or design build or any of the other opportunities, but if we've got something
that we are looking at under those options, it is almost certainly going to be a separate
project.
In closing, if you have any questions, just drop us a line. When you are submitting
your proposals make sure you clip them and not put them in folders, spirals, or
binders.
Do not leave the room without signing in because if your name is not on the sign-in
sheet, you are not eligible to submit. So it is really important, make sure you get your
name on that sheet.
The mandatory Pre-Submittal Conference was concluded at 10:41 a.m.
Addendum No.1 Mandatot'). Pre-Submittal Conference QA 050510Page 6 of 6
Addendum No.2
CITY OF SUNNY ISLES BEACH
R.FQ NO. 10-04-01 - Professional Engineering Services
R.FQ NO. 10-04-02 - Professional Architectural Services
To All Bidders:
Bidders for the above-referenced projects shall take note of the following changes, additions,
deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the
Contract Documents shall become a part of and have precedence over anything shown or
described otherwise.
3. Q: Is the City asking for a Financial Statement/letter from an accountant for the
revenues for the past two years or will just the numbers suffice?
A: The numbers will suffice.
END OF SECTION
Addendum No. 3
CITY OF SUNNY ISLES BEACH
RFQ NO. 10-04-01 - Professional Engineering Services
RFQ NO. 10-04-02 - Professional Architectural Services
To All Bidders:
Bidders for the above-referenced projects shall take note of the following changes, additions,
deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the
Contract Documents shall become a part of and have precedence over anything shown or
described otherwise.
4. Q: On page 4 of RFQ 10-04-01, the City of Sunny Isles Beach requests "A list of all
projects (including government projects) completed or in process for the past five
years, and a corresponding list of client references with contact names and telephone
numbers." - Is this item excluded from the 10-page limit?
A: Yes.
Q: On page 4 of RFQ 10-04-01, the City of Sunny Isles Beach requests "Proof of
authorization to transact business in Florida from the Florida Secretary of State, from
the prime as well as supporting firms." - Is this item also excluded from the 10-
page limit?
A: No.
Q: Should we include tax documents to indicate financial state of business? Or what
other document should we include to show financial state of business?
A: Tax documents are not necessary, just a brief summary will be fine.
Q: Do these count as part of the ten-page proposal?
A: Yes.
Q: Do the sworn statement and affidavit count as part of the ten-page proposal?
A: No.
END OF SECTION
Addendum NO.4
CITY OF SUNNY ISLES BEACH
RFQ NO. 10-04-01- Professional Engineering Services
RFQ NO. 10-04-02 - Professional Architectural Services
To All Bidders:
Bidders for the above-referenced projects shall take note of the following changes, additions,
deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the
Contract Documents shall become a part of and have precedence over anything shown or
described otherwise.
5. Q: There is a discrepancy with the RFQ No. in the Professional Engineering Services
proposal for the City of Sunny Isles Beach. On the front, it mentions RFQ No. 10-04-01,
however, inside on the page that mentions 1.1 Introduction, 1.2 Time and Date of
Submittal, etc., there is another RFQ No. This time, RFQ No. 07-07-01. Which RFQ
No. do we use as correct?
A: The correct number is the first one, the 10-04-01.
6. Q: Is SF 330 substituting SF 254 and SF 255? Or one can submit either the 330 or
254/255?
A: Either way, the 330 or the 254/255.
7. Q: Item 2 (list of projects for the past 5 years) can be covered through forms SF 330 and
254/255: is it going to be considered separately anyways?
A: Please list the relevant projects in the ten pages (though they are not required to
be in the same format as the 330/25-1/255).
8. Q: According to Addendum 3, proof of authorization to transact business in Florida &
the financials will count towards 10-page limitation. Please see Q 2 and Q4 on addendum.
We had understood at Pre-Proposal that these pages would not count. Please clarify.
A: The authorization themselves are not included in the ten pages, and though the
financial statements (tax return, etc.) are not either, a summary of the status of the
firm should be. From past experience, it did not typically take the full allotment
of pages for firms to make their case. Please focus on the content.
END OF SECTION
Addendum NO.5
CITY OF SUNNY ISLES BEACH
RFQ NO. 10-04-01- Professional Engineering Services
RFQ NO. 10-04-02 - Professional Architectural Services
To All Bidders:
Bidders for the above-referenced projects shall take note of the following changes, additions,
deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the
Contract Documents shall become a part of and have precedence over anything shown or
described otherwise.
9. Q: In Addendum #4 for RFQ 10-04-01, in response to question #7, the City of Sunny
Isles Beach states that the list of projects for the past 5 years is included in the 10-
page limit.
However, this is contradictory to Addendum #3, in response to question #4, in which
the City states that the list of all projects for the past 5 years is excluded from the 10-
page limit.
Please clarify if the list of projects for the past 5 five years is included or excluded
from the 10-page limit.
A: My apology for the confusion. In the ten pages, you should include anything that you
feel is relevant to your presentation, obviously potentially including experience. The
formal presentation of experience for the past five years will not be counted as part of
the ten pages.
10. Q. If the contact person in Item 5 is also one of the listed in Item 6 (where all her
information will be shown), is necessary to write her information in Item 5?
A: You only need to state that they are one in the same.
11. Q: We just received Addendum #4 for the RFQ #10-04-02 and there is conflicting
responses to critical submittal items. Addendum #4 question 7 indicates that relevant
projects are to be included in the ten pages BUT Addendum #3 question #4 indicates that
the project list are excluded from the 10 page requirement.
Also Addendum #4 question #8 indicates the authorizations are not included in the 10
pages but addendum #3 indicates proof of authorization is not excluded.
We would appreciate clarification so we can provide an acceptable submittal.
A: Confusion reigns, my apologies to all. The first response was incorrect, the proofs will
not be counted as a part of the ten pages.
END OF SECTION