HomeMy WebLinkAboutSHAW Environmental, Inc.
~
Stiaw@ Shaw Environmental, Inc.
. ------------------------------ -------- ---------------------------------
.
.
A World of Solutions
Jane Hines, CMC, City Clerk
City of Sunny Isles Beach
18070 Collins Avenue
First Floor Meeting Room
Sunny Isles Beach, FL 33160
RECEiVED ^/
AUG 2 2 200i to:'>
CITY OF SUNNY ISLES BEACH
OFFICE OF THE CITY CLERK
August 21, 2007
RE: Request for Interest and Qualifications for Professional General Engineering Consultant
RFQ 07-07-01
Dear Ms. Hines:
Shaw Environmental, Inc. (Shaw) is pleased to present the enclosed qualifications package for
Professional General Engineering Consultant in the following areas:
. Geotechnical
. Structural
. Environmental
. Construction Management
. Construction Inspection
. Electrical
. Hurricane Recovery and Debris Monitoring Service
. General Design Work
. Public Involvement
We trust that your review of the package will not only reveal our strong capabilities in all listed areas but
also our dedication to quality work delivered on time and on budget.
Shaw's vast resources have allowed us to build teams customized for our contracts. We are pleased that
Jordanna Rubin could be made available as Project Manager for this work. Her background uniquely
prepares her to bring benefit to the City as you implement projects. She was formerly the Environmental
Manager for the City of Miami Beach and was involved with the numerous environmental and marine
related projects. This experience provided valuable insight and knowledge of environmental capital
projects and related pennitting and testing protocols.
Behind her stands a team that will contract and expand as the City calls upon us. All disciplines are led by
highly qualified specialists to ready to assemble the right people to perform a wide range of engineering
services to support the needs of the City. As you will note by their resumes, all are highly experienced
professionals and bring real value to the City's projects.
Through Shaw, The City of Sunny Isles Beach will have a proven team ready to quickly take assignments
and to efficiently provide the City with all the engineering services it requires. Our approach has always
been to find the best solution for our clients so that we may establish a partnering relationship with them
over the long term.
14350 COMMERCE WAY, MIAMI LAKES, FLORIDA 33016 . 305.818.2652 . FAX 305_2317403 . THE SHAW GROUP INC_@
.
.
.
6-
Stiaw' Shaw ErMronmental. Inc.
Jane Hines. CMC. City Clerk
City of Sunny Isles Beach
August 21, 2007
Page 2
Our policy is to be available to out clients at all times-24/7-to provide expert service whenever needed.
Among the benefits we bring to the contract are our 20-year history of envirolUnental and engineering
programs in Florida; local design centers with recognized engineers covering every discipline of interest
to the City; full in-house assessment and remediation capabilities; construction management services; and
regulatory agency familiarity. All of these key abilities and benefits are seamlessly combined to provide
solutions and create results.
We would like to certify that no individual involved with this contract has a conflict of interest. I would
be happy to answer any questions you might have concerning this submittal. I can be reached in my
Clennont office at 352-24l-2231 or cell 407-448-3l28. Jordanna Rubin is out on maternity leave at the
moment, but will make herself available to answer questions if you need.
Thank you for your consideration.
Sincerely,
Shaw Environmental, Inc.
~
Curtis Lee, P.G.
Florida District Manager
Attachments
.\'..'IPlVposalsICi~\' of SlIfmy Isles Beacft':Gelleral Engineering Se,,"ices ](J()7"Proposal letter. doc
A Shaw Group Company
.
.
.
CITY OF SUNNY ISLES BEACH
QUALIFICATIONS FOR PROFESSIONAL GENERAL ENGINEERING CONSULTANT
Table of Contents
1.0 Expression of Interest.... ........ ........... ..... ....... ........... ..................... ............................................ ... ........2
1.a Overview of the Firm..................................................................................................................2
o Shaw Environmental, Inc. ................................................................................................................2
1.b Shaw's Presence in Florida .......................................................................................................3
2.0 RFQ Required Data... ........ ..... ................ .............. ................. ..............................................................4
3.0 Qualifications for this Contract ............................................................................................................5
3.a Management Approach .............................................................................................................6
3.a.1 Organizational Structure .................................................................................................. 6
3.a.2 Overview of Shaw's Project Control System ...................................................................6
3.a.3 Schedule Control......... ..... .................. .......................................................... ...................6
3.a.4 Cost Control.............. ..... ..... ............ ............ ..... ................................................................6
3.a.5 Health and Safety ..~......................................................................................................... 7
3.b Personnel................................... ......... ....................................................................................... 7
3.c Approach to Projects ................. ....... ........................................... .............................................. 7
3.c.1 Engineering Design Development, Analysis and Cross-Discipline Coordination ............ 7
3.c.2 Compliance with Codes, Permits, Scope and Funding .................................................12
3.c.3 Samples of Service ........................................................................................................ 13
SF 330 - Complete (Includes resumes, projects/with contacts)
I SHAW ENVIRONMENTAL, INC_
CONTENTS I
CITY OF SUNNY ISLES BEACH
QUALIFICATIONS FOR PROFESSIONAL GENERAL ENGINEERING CONSULTANT
.
1.0 Expression of Interest
Shaw Environmental, Inc. is pleased to submit our
expression of interest and qualifications for
Professional General Engineering Consultant services
for the City of Sunny Isles Beach.
We are a full service company, capable of self-
perforn1ing the following services to the City:
. Geotechnical
. Structural
. Environmental
. Construction Management
. Construction Inspection
. Electrical
. Hurricane Recovery and Debris Monitoring Service
. General Design Work
. Public Involvement
.
Our resources are immense, but we consider ourselves
first and foremost a local consultant, committed to the
success of our communities and clients. Our strategy in
serving this contract is to assign discipline leads who
would tap local (or, if appropriate, national) experts to
support assignments. Our size is irrelevant to the City,
except for the fact that we offer a depth of resources
that can accommodate diverse and concutTent service
requirements.
.
1.a Overview of the Firm
The Shaw Group Inc. is one of the world"s leading
design, engineering, environmental, infrastructure,
fabrication, and construction service companies, with
nearly 22,000 employees in 220 locations worldwide.
Founded in 1987, Shaw has grown in size, ability, and
di versity 0 I' services. [n 2006, our eal11ed revenue was
$4.8 billion. Headquartered in Baton Rouge, Louisiana,
the company is publicly traded on the New York stock
exchange (SGR, www.shawgrp.com).
[n 2003, The Shaw Group debuted on Engineering
News Record's top lOO-list of "America's Most
Admired Companies." This recognition supports
Shaw's commitment to provide a preferred place of
employment. By attracting and keeping high quality
and talented professionals, Shaw brings innovative and
effective services to our customers.
Today, in Engineering News Record, Shaw places in
the top 10 in the categories of Top 500 Design Finns,
Top 400 Contractors, and Top 200 Environmental
Firms. Among the Top 200 Environmental Firms, we
ranked 4th overall amongst all US based tinns in the
nation. In that category, we ranked No.2 in
Environmental Services and No. 1 in Construction/
Remediation. Our complete ENR rankings are shown in
Exhibit 1-1.
I SHAW ENVIRONMENTAL. INC_
06C122006T
A Fortune 500 finn, Shaw is a global provider of
engineering services, often implementing a project
from conception to construction and through long-tenn
operations and maintenance. Project assignments range
from simple to extremely complex, from small scale
and relatively small cost to widely distributed and
costly. Our projects often incorporate multi-node
service delivery or implementation aspects. Clients
range from federal, state, and local governments, to
small commercial concern and multi-national
conglomerates.
Our clients and peers speak best to our capabilities and
our attention to quality design and construction. We
have received numerous awards for our work:
. Shaw won the American Society of Civil Engineers
Metropolitan New York Chapter's Design/Build
proj ect 0 f the year award for the design 0 I' the Zerega
Avenue Bus Maintenance and Training Complex for
the New York City Transit Authority.
. For Shaw's recent work in Iraq for the Al Kasik
Military Installation, USACE Col. Laufenburgh
commended Shaw in the October 3, 2004 Daily
Report, saying, "Great news story - Shaw
engineering cOlI/pleted installation of'water line
hooster pUlI/p. They worked late int(; the night in
order to he prepared {hI' water deliverv. Thevalso
coordinated with the -Aski i\![osul pljJelfne in 'order to
start pUll/ping water later tonight. Kudos to Shaw ((n'
their e[((JI'ts. .. -
o Shaw Environmental, Inc.
Shaw Environmental, Inc. is a division of Shaw
Environmental & Infrastructure, [nc., a wholly owned
subsidiary of the Shaw Group Inc. We were
incorporated in 2002 by combining the environmental,
engineering, and construction expertise of Stone &
Webster, the [T Group, EMCON/OWT, and Coastal
Engineering and Environmental Consultants, Inc.
Exhibit 1-2 shows the organization of The Shaw Group
Inc. and where Shaw Environmental, Inc. fits in.
Shaw Environmental Inc. (Shaw) offers a highly skilled
team of over 6,000 technical and support professionals
strategically located in 90 offices throughout the U.S.,
and capable of providing professional services at any
project location.
Through growth and diversitication, we have expanded
our range of skills and resources to respond to the
growing needs of our clients. Today, Shaw is
recognized as one of the nation's largest full-service
providers of a host of environmental and infrastructure
engineering and design projects throughout the United
States and the world. We support our clients through all
phases of a project: from conceptual design, permitting,
envirolUnental assessment, remediation, engineering,
QUALIFICATIONS OF THE FIRM I
2
CITY OF SUNNY ISLES BEACH
QUALIFICATIONS FOR PROFESSIONAL GENERAL ENGINEERING CONSULTANT
.
Shaw # 4 Overall
Shaw #10 Overall
Exhibit 1-1. Shaw ENR Ranking. Shaw is highly ranked by Engineering News Record.
Shaw #10 Overall
Rank Cate 0 Rank Cate 0 Rank Cate 0
1 Construction/Rem ed iation 4 Hazardous Waste 9 Industrial Process/Petroleum
2 Hazardous Waste 6 Contractors by New Contracts 6 Power
2 Environmental Science 12 Heavy Contractors 9 Petroleum
9 By Clients - Federal 1 Chemical & Soil Remediation 13 General Building
6 Chemical/Soil Remediation 12 Industrial Process/Petroleum 11 Hazardous Waste
7 Site AssessmenUCompliance
.
and design through construction, startup, operation,
maintenance, compliance reporting, closure, and
redevelopment.
The foundation of our strength is our personnel. We
take pride in having been successful in attracting the
highest caliber of professionals to serve our clients,
giving us the depth of staff and experience in a wide
variety of engineering design projects to meet or
exceed all of the needs of our clients. Exhibit 1-3
provides a profile of the professional experts at Shaw.
Our personnel become an extension of our clients'
organizations, providing direct access to our proven
ideas, in-house research, and specialized services as we
jointly pursue the most efficient and effective solutions
for your business challenges.
Our excellent reputation derives from our emphasis on
client service, quality in execution of all tasks, compli-
ance with all regulatory guidelines, and adherence to
strict health and safety principles. Over 85 percent of
our business comes from returning clients-proof
that our emphasis on client satisfaction works.
1.b Shaw's Presence in Florida
Our commitment to Florida is real. Within Florida, we
have over 400 professionals working from offices in
Miami Lakes, West Palm Beach, Palm City,
Melbourne, Jacksonville, Clennont, Gainesville,
Pensacola, and Tampa, with primary offices as show on
Exhibit 1-4.
Shaw brings an in-depth knowledge of the unique
challenges of south Florida's geology, good working
relationships with Florida regulators, and familiarity
with the services the City requires.
Shaw is committed to fostering mutually beneficial
relationships with local MBE, DBE, WBE firms and
has an exceptional track record in support of small
6.
Stiaw'The Shaw Group Inc~
Nuclear
Fabrication &
Manufacturing
Environmental &
Infrastructure
I
Construction &
Maintenance
Energy & Chemicals
SFLA_100_1
6-
Stiaw' Shaw Environmental, InG.
. Heavy Civil and Infrastructure Projects . Facilities Management, Privatization
. Environmental Consulting and Engineering . Real Estate Restoration
. Homeland Security, Emergency Response
.
Exhibit 1-2. The Shaw Group Organization
Shaw Environmental Inc. is part of Shaw Environmental & Infrastructure, Inc., a subsidiary of The Shaw Group Inc., which
employs almost 22,000 people.
SHAW ENVIRONMENTAL. INC_
06C122006T
QUALIFICATIONS OF THE FIRM
CITY OF SUNNY ISLES BEACH
QUALIFICATIONS FOR PROFESSIONAL GENERAL ENGINEERING CONSULTANT
business. Through our extensive project work in central
and south Florida, Shaw has established strong links
with the small and minority business community
regionally. Shaw's programs have won awards and
federal government recognition for our mentoring of
numerous such companies. We received the Depart-
ment of Defense (DOD) "Award for Excellence" by the
Defense Contract Management Agency annually and
consecutively from 1993 to 200l. Shaw has also
received three consecutive DOD National Nunn-Perry
.
.
-
351
839
116
8
5
115
240
149
73
101
159
27
106
8
30
3
66
4
13
67
3
4
106
30
277
11
149
3
723
400
106
4
71
82
113
11
210
1
2
1,251
.
Discipline
Project Support
Administrative
CAD Technician
Community Relations
Computer Programmer
Computer/Data Processing
Construction Manager
Contract Administrator
Cost Engineer/Estimator
Engineer - Chemical
Engineer - Civil/Structural
Engineer - Electrical/Electronics
Engineer - Environmental
Engineer - Geological
Engineer - Geotechnical/Soils
Engineer - Industrial/Materials Handling
Engineer - Mechanical
Engineer - Mining
Engineer - Nuclear/Physics
Engineer - Safety/Occupational Health
Engineer - Sanitary
Engineer - Transportation
Environmental Specialist
Geographic Information System (GIS) Specialist
Geologist/Mining
Lawyer
Management Specialist
Planner: Urban/Regional
Production/O&M
Project Manager
Quality Assurance Specialist
Risk Assessor
Scheduler
Scientist - Biologist
Scientist - Chemist
Scientist - Ecologist
Scientist - Environmental
Scientist - Oceanographer
Scientist - Toxicologist
Technician/Analyst
Exhibit 1-3. Breakdown of Disciplines within Shaw (excludes
Operations/ Construction personnel)
Awards for Excellence in Mentor-Protege Programs for
small and MBE/DBE firm development in such areas
as service quality, technical performance, return on
investment, and overall business capacity and
capability development.
Our database of pre-qualified firms able to service our
requirements locally includes more than lOO firms.
\, Ji~^=-' -- L_ - - - __ (~.~
}~...... 1.."
~~ ~ -,
"'WOffi<'::~ ) 66 \
Clermont I!\....
Gainesville' ~ 6-
Jacksonville "(-
Melbourne \
V
f~
\.
Miami lakes
Mulberry'"
Palm City'
~
~~I
Pensacola*
Tampa
"denotes sarellire office
0>\ ,,;
Exhibit 1-4. Shaw Florida Offices
Shaw's offices are strategically located to serve our Florida
clients.
2.0 RFQ Required Data
Address: Our Miami Lakes office will be our center of
operations for this contract. The address of this office
is: 14350 Commerce Way, Miami Lakes, Florida
330l6.
Revenue: Shaw Group's revenue in 2006 was $4.8
billion; in 2005 it was $3.2 billion.
Names of Persons with Financial Interest: Our firm
is publicly traded on the New York stock exchange
(SGR, www.shawf;rp.com).
Completed Projects: Our SF 255 form provides lists
of federal and other projects completed. Because of the
size of our firm, providing a list of completed projects
is impractical as the entries would number in the
thousands. Clients with whom we work regularly
include: Florida Department of Environmental
Protection; Florida Department of Transportation;
South Florida Water Management District; Miami-
Dade County; US Corps of Engineers; 7-Eleven;
BellSouth; Orange County; Hillsborough County; Lake
County; CSX; Broward County; South Dade Landfill,
and many more.
06C 122006 T
I SHAW ENVIRONMENTAL. INC.
QUALIFICATIONS OF THE FIRM I
4
CITY OF SUNNY ISLES BEACH
QUALIFICATIONS FOR PROFESSIONAL GENERAL ENGINEERING CONSULTANT
.
References are provided on our SF 255 fonns.
Contacts: The following persons may represent the
company in negotiations for this contract.
Curtis Lee, P.G., Florida District Manager
415 Citrus Tower Blvd., Clermont, FL 347ll
352-24l-2231
Neil Campbell, Business Line Manager
14350 Commerce Way, Miami Lakes, FL 33016
305-818-2652
Clients, large and small, express their appreciation
"The ACEPD greatly appreciates a well-written and thorough
Quarterly Report. We also appreciate the attention to detail, and
the consistent and timely communication Shaw provides to our
office. Please keep up the good work. "
R. Crowder, Alachua County
Environmental Protection Department
"Many thanks to you and all of the Shaw team for the
tremendous work and achievement in assisting OSHA
throughout the rule making process, leading to the publication of
the final rule. Shaw's analyses of technological feasibility and
economic impacts are among the most advanced and refined
that we have ever adopted here at OSHA and have set
standards of excellence toward which we should aim in all
future projects. "
.
R. Blicksilver, Ph.D., US Dept. of Labor
Proof of Authorization To Transact Business: Our
certificate is included in Appendix A. A copy of our
Professional Engineers license is also included.
Proposed Personnel for Assignment: Shaw offers a
nationally recognized team of engineering professionals
with expertise in devising cost-saving approaches for
our clients. Shaw is prepared to assist the City of Sunny
[sles Beach with all of its goals for this contract.
Our Team will be actively managed by our Project
Manager (PM) who will maintain regular communi-
cation with the City's PMs. Jordanna Rubin, our
proposed PM, has a strong perfonnance record in
meeting client expectations and will bring that expertise
to the City for this contract.
Resumes and a draft organization chart are provided in
Section 7 of the SF 255.
Completed Forms: The Public Entity Crimes form and
Non-Collusive Affidavit are included in Appendix A.
.
3.0 Qualifications for this
Contract
Shaw will provide to the City our most qualified
technical resources to support every project needed, to
provide the project with any requested assistance, and
to complete each assiglUnent on schedule and within
budget to achieve the project goals.
We are structured to be demand-responsive and
efficient in the timely completion of every project
assignment and to make available the management,
professional, and technical resources necessary to
respond to whatever needs may arise.
Shaw is intimately familiar with the type of on-call
services and procedures involved for the design, design
review, assessment, inspection, and coordination
services required by the City. We have provided similar
on-call engineering services under task order contracts
for many local clients, executing task orders simul-
taneously as necessary, all within authorized budget.
Our overall approach is as follows:
. Plan the work and be flexible - For each task order,
we will define a clear understanding of the scope,
including any unique technical needs of the project,
assign the best staff resources to meet the defined
scope, and prepare a scope, schedule, and cost
proposal for approval by the City. Upon receipt of
approvaL we would immediately initiate the work.
. Execute the work in accordance with the schedule
We will monitor task progress and coordination,
providing the City with progress updates as desired.
On a regular basis, our progress repot1ing will pro-
vide a complete review of all assignments, forecasted
activities, and expenditures versus progress.
. Execute the work in accordance with the budget -
Budget control and cost containment are ongoing
processes perfonnecl by Shaw to effectively monitor
and control costs and to take timely action to main-
tain task progress against the approved budgets.
Changes in scope that increase or decrease approved
estimates will be immediately reported to the City.
. Ensure quality - Our quality control program makes
certain that all task deliverables meet contract
requirements and expectations and conform to appli-
cable accounting, engineering, and design standards
and regulations. The program will vary by task
complexity and is applied continuously on each task.
. Communicate via contract progress reports -
Since the nature of the assignments under this task
order contract will often likely have abbreviated
schedules and multiple task orders active at any
gi ven time, communication and reporting progress is
essential. Later sections describe some of our tools
used to facilitate efficient collaborations.
Performance metrics and contractor performance
standards are part of Shaw's culture. Delivering on
time, quality designs and reports that are professional
and coherent, within budget is a priority of our team.
SHAW ENVIRONMENTAL, INC.
QUALIFICATIONS OF THE FIRM
06C122006T
CITY OF SUNNY ISLES BEACH
QUALIFICATIONS FOR PROFESSIONAL GENERAL ENGINEERING CONSULTANT
e
We take advantage of to day's available technology to
seamlessly communicate with one another and bring
the needed expertise to bear on every project. We
provide a local service and solutions team and
incorporate the work of local experts/providers in an
integrated project team. This ability to adapt our
approach and utilize technology appropriately provides
tremendous value to our clients as they can be sure that
their resources are being spent efficiently and cost
effectively.
.
3.a Management Approach
One of the many advantages Shaw brings to the City in
providing environmental engineering services is our
comprehensi ve service capability.
We understand the desire of the City to accomplish its
tasks in a timely manner. Unlike many consultants,
Shaw is able to swiftly undertake and complete all
aspects of such a project using the same project
structure and management personnel. This will bring
efficiencies that will result in cost savings and high
quality end results.
Our contract management approach does not require
joint venture arrangements or division of the scope of
services. The City of Sunny [sles Beach will only need
to make one phone call for a wide range of services.
Contract and project management are a function of
technical knowledge, scope definition, schedule, and
cost tracking. Shaw's managers are leaders in the
industry.
3.a.1 Organizational Structure
The organizational structure is embodied by established
capabilities and resources directed by strong project
management. The management team focal point for this
contract is the Program Manager (Jordanna Rubin),
with her Technical Services Leads acting as secondary
contacts. The management team is supported by Health
& Safety, QAlQC, and the Contract Administrators to
assist in project execution.
The proposed organization for this contract is included
in Section 7 of the SF 255. You will note that beneath
each technical service is a cadre of experts, who will be
there when you need them, but only when you need
them. This organizational structure provides the
following benefits to the City of Sunny [sles Beach:
. A central management team that provides the City of
Sunny Isles Beach with a primary point of contact
. Clearly established lines of communication and
responsibility
. Experienced leadership for efficient operation
. Proven performance on previous contracts
.
SHAW ENVIRONMENTAL, INC.
06C122006T
Our Project Manager, Jordanna Rubin, will be the
primary point of contact for receipt of work
assignments and will be accessible to the City of Sunny
[sles Beach at all times. Ms. Rubin can be contacted 24
hours a day at the Shaw Miami Lakes office or through
her cellular phone.
3.a.2 Overview of Shaw's Project Control
System
Shaw understands that accurate, real-time tracking of
milestones, costs incurred and committed, as well as
trend analysis for future project costs, are of the highest
priority for our clients.
The Shaw management infonnation system (MlS) is a
fully functional and integrated system capable of
managing highly complex projects. The system is
crafted around real-time communication and cost/
schedule monitoring and control. Shaw uses
Timberline™ estimating, PrimaveraTl\I, J.D. Edwards,
and proprietary cost tracking software for managing
and processing data for estimating, scheduling,
budgeting, accounting, and reporting costs by different
funding sources and work breakdown structure.
Shaw's M[S provides the capability to define and
maintain a performance measurement baseline and
enable comparison of actual versus scheduled
performance or budgeted cost, including detailed
variance analyses at the work item level for individual
resource categories (e.g., labor, equipment, material,
and subcontracts).
3.a.3 Schedule Control
Shaw's scheduling process is based on experienced
schedulers assigned to the project, reliable field reports
showing daily progress, and proven and accurate
software.
Shaw has been using Primavera™ software for
scheduling for the past 8 years. All projects have
resource-loaded schedules. These schedules are
updated, at a minimum, every week. The effecti ve
execution of work will require careful planning and
coordination of project resources.
The project schedule is a planning tool that requires
continual review and updating throughout the project.
The site sequencing plans provide the site-specific
infonnation required to ensure that the work is
successfully accomplished within the time frames
established in the project schedule.
3.a.4 Cost Control
Shaw's productivity management processes are an
integral and critical element of cost control. This
ensures the tracking of both Shaw and subcontractor
costs and leads to accurate productivity analysis and
cost control. Cost/schedule control is achieved by:
QUALIFICATIONS OF THE FIRM
CITY OF SUNNY ISLES BEACH
QUALIFICATIONS FOR PROFESSIONAL GENERAL ENGINEERING CONSULTANT
It
. Organizing work during the estimate phase into
discrete and clearly definable tasks or work elements
. Establishing a cost/schedule baseline for each task
. Tracking and monitoring progress against baseline
. Forecasting costs
. Controlling changes to tasks
3.a.5 Health and Safety
Shaw has one of the lowest EMRs in the industry: 0.52.
Our Health and Safety Program consists of a compre-
hensive, two-volume set of health and safety procedures.
These procedures are available at every Shaw office and
project site location. Procedures establish the minimum
requirements necessary to safely perfonn all aspects of
hazardous, toxic, and radioactive waste operations. All
subcontractors under the direction of Shaw must also
comply with these program requirements.
.
3.b Personnel
Shaw's key personnel that will be devoted to this
contract were chosen for their depth of experience
relative to this work and for their history of successful
execution of projects with USACE, DoD, FDOT,
FDEP, DERJV[, and others. These qualified staff
members have extensive experience in providing the
services the City seeks. We are confident Shaw's team
will provide services to the City of Sunny [sles Beach
that are more efficient, more cost effective, and more
reliable than the City of Sunny Isles Beach has
experienced from any consultant heretofore.
Exhibit 3-1 provides a depiction of the organization
and Exhibit 3-2 provides a summary of the key
personnel assigned to the project as well as their
availability. The organizational structure of our
personnel and staffing plan is embodied by established
capabilities and resources directed by strong project
management. The management team focal points for
this contract are the Project Manager and Technical
Services Leads.
The proposed organization for this contract is included
in Section 7, with personnel resumes.
Shaw is prepared to begin serving the City upon
signing this contract. We are committed to timely and
responsive services and have the availability to provide
them. You will note that our team is made up of highly
skilled individuals, some of whom have limited history
in Florida. This is because Shaw creates opportunities
for its personnel commensurate with our business
growth. Some of our personnel included on our team
will be newly transferred to this area.
.
3.c Approach to Projects
Once a task order is awarded to Shaw, our PM will
determine the best execution approach to achieve a
quality design product within the given scope and
budget. Our work process flow is streamlined and
A Team Unequaled
. Project Manager with experience managing programs
with local city
. Technical experts well known and respected for their
successful projects-they have not only done it
before, but they have done it better, faster, cheaper
than others
. Team committed to its surrounding communities and
backed by vast resources of our large company
automated. (Exhibit 3-2 illustrates the process.) Should
the City have need of expertise not now anticipated,
Shaw has access to designers with extensive expertise
in areas beyond those identified in the City's RFQ.
Shaw's PM can easily tap into those resources. lf a
designer is located in a remote office, our design
process facilitates communication and collaboration so
that the location of the design work is seamless to the
City. Daily conference calls, a common design platfonn
and procedures, and as-needed, trips to project sites by
the staff make our work efficient and enhance the
quality.
3.c.1 Engineering Design Development,
Analysis and Cross-Discipline
Coordination
Within Shaw, our engineering standards require cross-
discipline coordination and signoffs, assuring the City
of high quality engineering products. As project
solutions are devised, we will ensure that both quality
assurance reviews and peer reviews are done in order to
capture interdisciplinary concems and apply them to
the final product.
Beginning with a reviewal' available data about the
project site and an analysis of possible deficiencies/
gaps in data, applicable local, state, and national codes,
Shaw develops preliminary designs using sound
engineering practices that implement proven industry
standards and take advantage of current technology.
The breadth of our engineering knowledge and
experience gives us the ability to analyze the most
difficult problems and provide the optimum solutions.
We consider a number of factors in reaching the best
design solution including:
. Design Complexity: Is this a unique, cutting edge
design or a common design?
. Constructability: Can the project be built and
function as designed? Shaw typically conducts
constructability reviews at 60% and 90% design
stages to ensure design is both constructible and cost
effective.
SHAW ENVIRONMENTAL, INC.
QUALIFICATIONS OF THE FIRM
06C122006T
f-
Z
<(
f-
e
u
CJ
z
~
w
w
z
CJ
z
W
...J
<(
0:::
w
Z
w
CJ
...J
<(
Z
o
(fJ
(fJ
W
LL
o
0:::
D-
o:::
o
LL
(fJ
Z
o
i=
<(
U
LL
:J
<(
:J
o
.
I
U
<(
W
III
(fJ
W
...J
(fJ
>-
Z
Z
.
>-
t:
u
C (])
.~.~ ~ -S 0
'-;::;:~'O.r::.(])
o OOt::~CJ)(J).;
.r::.~(])Q)1!(])15t(])
+-I a.:5CO (J- ~ Q) Ol
Cl.x . Cl..r::.Cl.('O
(])(])(])(J)XE~xc
'0 2: (]) ~ -- '0 (]) ('0
(]) '0 (]) C Cl.(J) '-~:2:
.r::.c(J)=E(])('Oc
~ ('0 0 .9- 0 '0 2: (]) U
(J)(J)~~u('OoE(])
('0 ~ 2:"- '- E ':l::; (]).O'
.r::. '-'_ '0 (]) Q) .r::. CJ) '-
:;: 6 ~ ~ E .0 .Ql ~ 0..
('O(J)~('O~==~('O:J
75~'6E('O:;:(j)Eo
---,
.
(j; I
~ . g>
c <:> iij I
g, 0.. ::E I
~:3~ I
> on I
'5~o I
U :J '" I
~u:g I
w ~-.J
u
~ ~
CON
e ~.~
.g~~
~.:: ...J
U E C
'" 'tl"
.b<(~
C
o
U
J::
CJ
('0
(])
al
(J)
(])
.!!!
>-
C
C
:J
rn
-
o
~
u
(])
J::
-
'-
o
-
C
o
+::
('0
.~
C
I1l
en
'-
o
(])
CJ
.~
(])
rn
~
..
Dl
'"
C
'"
::.
.~
iii
:J
o
I
I
I
I
I
~
I
J
:J
LL.
.....
I
(")
-
:c
J::
)(
W
---,
I
I
I
I
I
~
..
u
tt
0",
-.<=
U C
.. ..
'o'~
~w
~~
0":
~
o
""
uOC
"'0.
g~
:J.<=
o u
..
~~
'" U
:J '"
E C
E 5
00
u
-1
~ ~ I
.. ::E I
1;l.E 58 I
o CJ).o c: I
U ,lj,e ~ I
U Ql <9.~
'5-:g~~1
3~~1-~1
u '"
rn <:>
..
I
I
. -l.
o
"- .~
.. C
g'E
C 0
",-0
::. (j;
rnO:
06 C
::1:'<=
o
--,
~UJUJn.'~~~
a.. Ii 1: a..
ro m ~ ~ U 'c
~ ~ .~ ~ g ~
en ~ <(:8 .~ 'n.~ ~
"c (;) ..... ...
ro ::J (/) -6 E 0
lr 8 ~ ~ ::; a::
ui ui :i w 0
cLcLE.~cL
:E.~~~~
~ 'd .~ ~ ~
E~cac
~'E8-gg
co c <1.l "'C
~ -, ~ as ~
w
<i on
:i <i>
'" ~
.. 0
!!!n.
~%
'E13
~~
u
i:r:
w w
<i <i
oj 0
'" .c
~ Q.
0> c::
C '"
iii ~
.<= iii
U ,,:
g> en
~ ~
u.i w L1..i u.i
cL~u.i:icLcL
~ i ~ ~~ ~
"'iii~~~:e
~u..c~E*
~~~~~~
~~ t=s:~
~ u.i
~ ~ ~ ~ ~ u:
....- .... c: c i
Ql~io*~
~C1l~~CW
~ 0 ...J '5 l')
g~~~~~
w marw~
iil --,
::E
w~
a. <J .s
Ecjo,gr.ti~
"E Ii ~ -g ~ c
~g~~~g
~.€~-.~--;.~
_.ero (1)-
~~uUJ~~
w~ U5~
'"
--,
u.i u.i
Ii Ii
<i
<i
a:;
D
0-
E
'"
u
<:>
0>
..
t5
w w
cLa.::ig>
'N .2 t ~
ro ::J Q) Q)
c: 0 .0 C
~ g-"w ~
UJ'5~UJ
.~ ~o O>~u oc
~ C Q) 0
~~(9
w
<i
..
C
iii
oc
..
U
:J
co
co
:2
0:::
LL
W
I
l-
LL
o
(fJ
z
o
i=
<(
U
LL
:J
<(
:J
o
u
z
...J
<(
f-
Z
w
:2
z
o
0::
;;
Z
w
5:
~ ~
(fJ U
:s
I-
Z
-<
l-
e
()
(?
z
a:
w
w
z
(?
z
W
...J
-<
a:
w
z
w
(?
...J
-<
Z
o
Ui
(j)
W
lL
o
a:
0..
a:
o
lL
(j)
Z
o
f=
-<
()
lL
...J
-<
::>
o
. . x
. . . x x x x x x x x x x x x x x
.. '. .. x x x x x x x x X
I. . . 1 . '. . x x x x x
. .. . . x x x x
... . . . x x x x x x x
. .. . x
. .. . x
. .. . .. x
. .. . . '. x x x
. .. . x x x x x
. .. . x x x x
. . ..
. . . . . . .. x x x x x
. . x x x x x x x x x
. . . .. ... . . x x x x x x x x x x
. . . . . . . . . .
. . . . . . x
. .
.
. . . . .. . . . . x x x x
. .
. .. . .. . .. . 1 X X X
. .1 . '. . .. x x
. . .. II .." . . . x x
. .1
. . : '. . . . x x x x x x x x
. .
. .1 . . . . x x x
. '. .1' : . X X
W 0 W
W ~ W w a.. w
w a.. a.. w 0:: a.. a.. w
w 0.: a.. a.. w en
0.: <( w 0 <( w a.. oj a.. C Qj ~ a..
>. Q) <( w a.. E ~
c: a.. .c Oi a.. en :: Q) <tl <Ii
<Ii Q) en a.. Q) ro ~ .c 0.: oj .Vi 'tJ W Q) W
'-' .~ Q) .ci Q) <tl ~
~ <tl E (5 .ii) ~ E c: c: '-' > en c: 0.: E a..
ii5 .c 0 ..; Z <tl c: E ~ Oi Q) ~ Q) <(
<tl <tl 0 -, 0 ii5 c <tl
(i ro 0:: >- .c <tl Q) Z -, C
-, E 0 C (5 t' <Ii
<Ii (J 0 I- >. .c .c 0
E .:,i .c <( Qj Qj 0:: Q) Ol 0 >. <tl .N ~ 0 (i en
3: '-' :.c .0 .0 Oi € ~ c: en Q) .c <tl c: -, Qj
.ii) ~ .,;: ~ .ci Cl. Cl. oj c: '-' 'c 'tJ (i c: c: c: <tl Ui Cl.
.c 'tJ 01 '-' E E E en <tl :J Q) c: .:;; 3: Q) :.>: -e ::i .c
(5 Q) > E
N c: c: <tl :J <tl <tl <tl .c 0 0 :J <tl Q) 0 en en 'm c: 'ii)
<i: <( <( CO ai CO (J (J (J (J (J (J 0 0 0 w w u. u: <.9 i3
.
I
()
-<
w
CD
(j)
W
...J
(j)
>-
z
z
.
>-
l-
i)
Ol
:2:
a:
lL
w
I
l-
lL
o
(j)
z
o
f=
-<
()
lL
::::i
-<
::>
o
()
z
...J
-<
I-
Z
w
:2:
z
o
a:
:>
z
w
5:
-<
I
(j)
~
u
:g
f-
Z
<(
f-
...J
.
U
CJ
Z
0::
W
W
Z
CJ
z
W
...J
<(
0::
W
Z
W
CJ
...J
<(
Z
o
(f)
(f)
W
LL
o
0::
D-
o::
o
LL
(f)
Z
o
f=
<(
U
LL
:i
<(
:J
o
. . X
. . . X X X X X X X X X X X X X X X X
.. '. .. X X
I. . . 1 . .. . X X X
. .. . . X X X X
... . . . X X
X
. .. . X
. .. . X X
. .. . .. X
. .. . . " X X
. .. . X X X
. .. . X X X X
. . ..
. . . . . . .. X X X X X X
. . X X X X X X X X X X X X
. . . .. ... . . X X X X X X X X X X X X X X
. . . . . . . . .
. . . . . . X X
.
. . . .. . . . . X X X X X X
. .. . .. . .. . 1 X X
. .1 . . .. X X
. . .. .. .... . . .
. .1
. . : " . . . X X X X X X X X X X X X
. .1 . . . . X X X
. .1 . .. : . X X X
en a;
e Cl
<Il
C U) C
-.J <Il
0 Q:; ~
U w t>
t> w w w w Cl. W
W W Q)
Q) Cl. Cl. 0 0.: Cl. "e- Cl.
'Q 0.: c- w Cl. < w
0': w w w c- o.: Ui ~
Q) Cl. --, Cl. 0
~ W .c ~ --, Cl. Cl. W Cl. .c c- Q) 'E w
, Q. c1i 0 E E <Il Qi ci <Il Q)
E u Cl. Q) c c >- <Ii E Cl. c1i --, 0 ~ .c Cl. (1) c Cl
Q) Q) .c en C
0 Jj Cl .g US .C -0 Q) ~ u <Ii w <) .c Q) e
f0- e Q) Q) Qi 'c '0 ~ oc .1; <) u (1)
E 0 :J ~ '0 Q)
<Ii c- Q) w cO .c w E (1) ~ .0 <Il :; --, :e --, :J e C>
ro i= Q. --, :i to
c 0 C> ai u c- --, 0 E :~ <Ii --,
'c :,,:: E :>. Q. (1) ,g t
0 Ui 0 .r: c c Qi '2 Q) a; c1i
.0 <Ii 0 (1) 0 0 c Q)
c E '0 u '€ :;J .c E en .~
.0 "'" :2 (1) u U .c .B 3: c :0 .0
~ .c .~ (1) v; c c (1) ro u u u -0 Cii .~ 'm 'w
0 ~ (1) 0 >. ~ ~ Q) 0 :J
--, I -.J ::J -.J -.J ~ ~ ~ ~ ~ Cl. Cl. Cl. Cl. a:: a:: U)
.
I
U
<(
W
CD
(f)
W
...J
(f)
>-
z
z
.
>-
t:
u
o
~
2
0::
LL
W
I
f-
LL
o
(f)
z
o
f=
<(
U
LL
:i
<(
:J
o
u
z
...J
<(
I-
Z
w
2
z
o
0::
:>
z
w
S
<(
I
(f)
i
~
I-
Z
<{
I-
...J
.
U
CJ
Z
0::
W
W
Z
CJ
z
W
...J
<{
0::
W
Z
W
CJ
...J
<{
Z
o
(/)
(/)
w
ll.
o
0::
D-
o::
o
ll.
(/)
Z
o
f=
<{
u
ll.
::::i
<{
:J
a
>-
I-
U
. .
. ..
.. .. X
t. . . t . '. . x x x
. .. . 0 x x
... . . . x
x
..
. .. .
. .. . .. x
. .. . .
. .. . x x
. .. . x
. . '0
0 . . . . . .. x x
. . x x x x x x
. . . .. ... . . x x x x x x
. . . . 0 0 . 0 .
. . 0 . . .
.
. 0 . .. . . 0 . x x
. .. . .. . .. . t
0 .t . . ..
. . .. .. .... . . . x x
. .t
. : o. . . . x x x
. .t . . . . x x
. .t . .. : 0 X X X
:2
:2
I W W ~
~ w () 0... 0...
0... 0.: <.9 <i
cii 0 z
c w >. w 0.: .c (j; u...
.(1i 0.: w 0 0... C 0... Ui -'"
.c OJ
() 0... Q) ui 0 .(1i Q) :J
c:- (/) > 0
en (5 co co ::.: ro
ro 'C- 0, -, en >.
c C :J Cf) u...
0 I1l co 0 C c: Qi
-, 0::: 0 0 co 0 0
::i ai (/) .; Cf) .c (/)
co c: +-" OJ (/)
.~ OJ .c co co :.c c c :J
.c .~ .~ ~ 3: 3: co 0 0
Cf) Cf) Cf) Cf) >- >- >-
~
~
:2
0::
ll.
W
I
l-
ll.
o
(/)
z
o
f=
<{
u
ll.
::::i
<{
:J
a
.
I
U
<{
w
co
(/)
W
...J
(/)
>-
z
.
u
z
..,j
<{
I-
Z
w
:2
z
o
0::
:>
z
w
S
~ ~
(/) "
is
CITY OF SUNNY ISLES BEACH
.
Task Assignment
Collect Available Data
Identification of Key Tech Team
Develop Tech Approach:Design BasI5
Preliminary Engrg Cost Estlmate/VVeS
Iden~fication of ScopelOeli"erables
Preliminary Proj. Schedule
Preliminary Capital Cost Estimate
Schematic I
Preliminary Design
Phase
Design Documents to 30%
. Outline Spec & Equip Data Sheets
. Drawings
. Calculations
. System Descriptions
300'0 Engineering Capital Cost Estimate
Engrg Studles.\ Addllionallrwestigatlons
Value Engineering (Ifneces::>aryl
Engineering Services
During Construction
.
Rev 3. App Vendor:Contractor Submittals
Process RFls
Periodic Field ViSits/Inspections
Resolve DefiCiency ReportsiQC Issues
Prepare Design Modifications
Resolve Ch-lnge Orders
~egulCltory Support
QUALIFICATIONS FOR PROFESSIONAL GENERAL ENGINEERING CONSULTANT
Citv Approval
Task Approval
Validate Final
Scope
Budget
Deliverables
Schedule
Verify Key PrOject Staff
City Approval
Design Development
De~lgn Documents to 60%
Draft Spec & Equip Data Sheets
. Drawing3
. Calculation3
. System Descriptions
60% Engineenng Capital Cost Estimate
Constructablllty Review
Permit Application Data Completed
Startup.
Commissioning &
Turnover
Review 01 Project O&M Manuals
Assist In Commisioning
Support of Project Permits
Exhibit 3.2. Shaw's Design Development Process
Risk Analysis: Risk must always be a consideration to
protect the public and property assets.
. Cost of Construction: Budget availability will
sometimes drive the type of design undertaken. For
example, use of a standard pre-engineered building
verses a custom designed building can be influenced
by the budget available for the project.
. Life-Cycle Cost and Design Serviceability/Life: Key
elements in making final design, construction, and
operating decisions.
3.c.2 Compliance with Codes, Permits, Scope
and Funding
As design engineer, Shaw is ultimately responsible for
understanding the full context in which a given design
will be implemented. This requires that we remain
aware of and incorporate design standards, local codes,
and ever-changing industry standards into the design
while seeing that the project remains within permit
conditions. We do this using our project Quality
Control team. Through QA inspections and reviews
performed on all parts of the design as it is in progress,
we make certain that the design meets project
requirements for functionality, aesthetics, long-term
.
SHAW ENVIRONMENTAL. INC.
06C122006T
Project Kickoff
Conceptual Design
Phase
PrOject Team Kickoff Meeting.'Revlew
Schedule
Budget
Deliverables
Contract T & C's
Staffing Plan!Team ~lembers
Design Manual
SOP's
Gather Available Information
Surveys, Geotech & Enviro Investigations
Procurement Plan
Contracting Bid Package Plan
Establish Design Critena
Engineering Studies
Conceptual Design to 15%
Final Design I
Construction Bid
Documents
City Approval
Bid Phase Services
100D'0 De~ign Documents
Draft Spec & EqUip Data Sheets
Development of Bid/Contract Documents
Drawings
Respond to Bidder Questions
Participate In Pre-Bid ~leetlng
Develop Addenda (as required)
ASSist in Bid Evaluation
Permltlng Plan
Outreach plan (if necessary)
Calculations
1000/0 Englneenng C<lpltal Cost Estlm,lte
Engrg In:;pectlon & Tes.tlng Program
City Approval
Project Completion &
Close.out
Clos.e-out Project Records.
S"Jnd Record:; to A.rchlves.
Support Clos.e-Oul of PO's
8"Jst Pr:lctlc",:;lles.s.ons learned Report
O&M and/or life-cycle expectations, and cost. This QA
review also ensures that schedules are met and
deliverables are submitted on time.
Shaw provided preliminary and final design services for the
$500-million South Boston Piers Transitway Project, a 2-mile
subway line with five underground stations, including
interchanges three lines and commuter rail services.
QUALIFICATIONS OF THE FIRM
CITY OF SUNNY ISLES BEACH
QUALIFICATIONS FOR PROFESSIONAL GENERAL ENGINEERING CONSULTANT
.
....
.. .........
~ ....,.,
::
"" '.," '" ~ "~""-- ~"'.; tl
. .iIJ/I:..~'. ..-..~~. ~I.
..
~
- .,
....... ~ '\
.~. '. .,..f"<lOo_J.,
~ - \..'~ ~ ~tt.
. ~ . ;: ." ........ _r - ....,. '
.......;:!" :n' ..~'J.
":: IIJ .,
~"
.~.. .pl
. ...,./ "
For this Texas Utilities rail spur, Shaw designed numerous at-
grade and grade-separated crossings of roadways of various
classifications, relocation/reconstruction of several roadways,
drainage improvements, utility relocations, track and roadway
signage, traffic management, landowner requirements (cattle
crossings, etc), and coal unloading/handling facility.
.
Code compliance is the responsibility of each discipline
engineer as they are most aware of the various code
provisions. Permits required t'(:)r a project are identitied
early on as noted above and the application is submitted
as soon as possible on each project. Complying with
the requirements of each permit is the responsibility of
the discipline engineer in concert with the project
engineer and Quality Control.
Funding compliance is constantly monitored by our
project management team, making sure that all aspects
of the scope are executed, any scope changes are
approved prior to execution, and projections of costs
are made that will forewam us of any possible problem
areas.
3.c.3 Samples of Service
Shaw's personnel are prepared to perform any of the
scope items identified. Listed below are some service
areas we might anticipate providing.
.
Civil/Structural Engineering Consultant Services,
including such services as:
· Culvert Design
· Bridge Design, Inspections, and Refurbishments
· Water Control Structure and Spillway Designs,
Inspections, and Refurbishments
· Site Planning, Site Civil Engineering, [ndustrial
and Administrative Building Design
· Existing Building Modi tications
· Levee and Reservoir Design
SHAW ENVIRONMENTAL. INC.
06C122006T
· Canal Dredging, Widening, and Bank
Stabilizations
· Construction Engineering, Inspections, and
Certitications
. Cost Estimating
· Structure Inspection
Construction Management
Geotechnical Exploration, Surveying, Testing
Emergency Response Support, including such
servtces as:
· Debris Management
· Structural Inspections
· Electricallnspections
· FEMA Reimbursement
Standards Development
Electrical/Mechanical Engineering Services,
including such services as:
· New Stormwater Pump Station Design
· Existing Pump Station Refurbishments
· Water Control Structure Gate Hoist and Operator
Replacements
· Telemetry and Communication Equipment
Installation at Water Control Sites
· Navigation Lock Refurbishment
· Electrical Services, Generators, Switchgear,
MCCs, and Rewiring
· Construction Engineering, Inspections, and
Certi fications
· Cost Estimating
· Facility Inspections, Corrosion Investigations,
Mechanical/ Electrical System Evaluations and
Structural Analysis
· Civil/Structural/Permitting Services to Support
Electrical/M echanical Proj ects
Environmental Engineering Services, including such
servtces as:
· Hydraulic and Hydrologic Flow Measurement
and Modeling
· Canal Conveyance Capacity Planning and
Studies
· Design of Public Use Facilities
· Environmental and Wetlands
RestorationlM itigation
· Modeling for Canals, Impoundments and Water
Quality Improvements
· Groundwater Transport and Flow Net Modeling
· Water Quality and Flow Monitoring
QUALIFICATIONS OF THE FIRM
CITY OF SUNNY ISLES BEACH
QUALIFICATIONS FOR PROFESSIONAL GENERAL ENGINEERING CONSULTANT
.
. FEMA Debris Removal Contacts, Administration
and Contract Management
. Standards Development
. Environmental and NPDES Pern1itting
. Hazardous Materials Testing and Remediation
. Construction Engineering, Inspections, and
Certifications
. Cost Estimating
. Environmental Monitoring
. Wetland Design, Delineation, Mitigation
. Planning Program Development, Budgeting,
Feasibility Studies, and Environmental Impact
Statement
. Technical Analysis (Minimum Flows and Levels,
Water Reservations)
. Expert Witness and Independent Peer Review
We have designed industrial buildings ranging from
simple pump houses to complex multilevel power
generation facilities meeting building code criteria at
local, state and federal levels. Combined loading
conditions due to dead and live loads, wind, snow,
hurricane, and seismic are analyzed and the structure is
designed to withstand the most severe loading
combination. The same applies to administrative
buildings except that there is usually a higher
occupancy level and more architectural involvement.
Since the main activity in administrative buildings
involves people, computers, and other office related
equipment and functions that are performed, these
buildings have a lighter live load and result in a less
robust structure. Additional emphasis on architectural
amenities includes more windows, more comfortable
finishes, and climate control considerations including
heating, ventilation, and air conditioning.
As an example of our work, Shaw staff provided
technical assistance to the Miami River Commission
and Miami-Dade County regarding dredging issues
related to the USACE maintenance dredging and
disposal of contaminated sediments from this densely
developed river. Dredging consulting services also
provided to the Miami River Commission consisted of
the review and guidance on Project Cooperation
Agreements, the review of project plans and
specifications, and the preparation of infonnational
mailings and notifications to Miami River property
owners. Shaw staff developed dredging description/fact
sheets for public distribution and notification letters for
riverfront property owners; provided responses to
questions from the public regarding potential impact of
project to property/structures along the river; and
supplied continual dredging technical resources to the
commission and county.
.
.
SHAW ENVIRONMENTAL. INC.
06C 122006T
Shaw has provided engineering and design services on
various water control, spillway, rehabilitation, and dam
safety projects located across the US, Canada, and
internationally. These projects have included large
power plants on major rivers including the Connecticut,
Susquehanna, Mississippi, and Columbia Rivers.
Examples of projects that include these features are:
. FOR Power Habitat Improvement Project
. Garrison Hydroelectric Project
. Boundary Hydroelectric Project
. Priest Rapids Dam
. Wanapum Dam
. Rock Creek
. Williams Fork
;;00- ~
.....- -'.....~
~ ~~~0'.:~
,:-. - .,
, -
-~
-~~.:...
;'.:Jo
Shaw was the design member of an integrated design-build
team for the Mud Lake dam and reservoir which is located in
Nevada and completed in 2000.
One example of our site planning and site civil
engineering design is the Hanscom Family Housing, a
US Air Force project in Lincoln, MA, where Shaw
completed the civil and utility designs for demolition of
850 housing units and construction of 784 housing units
and 5 neighborhood centers. The project included
design of 8 miles of new roadways, parking areas, 350
drainage structures, 8 detention areas and 7
underground infiltration galleries, fire protection, water
distribution and a sanitary collection system, natural gas,
electrical and communication systems.
If"'" -:>>:1~
C.
- i
~1..
I~
: .
Environmental Dredging at Badger Army Ammunition Site
QUALIFICATIONS OF THE FIRM
.
.
.
CITY OF SUNNY ISLES BEACH
QUALIFICATIONS FOR PROFESSIONAL GENERAL ENGINEERING CONSULTANT
SF 254/255/SF 330
I SHAW ENVIRONMENTAL, INC.
06C122OWT
co
o
o
N
.1
Q.
'0 5
Q) U
ro cD
at :0
ct .~
Q) 0..
ro n.
o ro
cot) :-t:
f-:Ii
o
Qi
.0
~
U
Q)
.c
u
"0
c:
co
n.
1:
Vl
Qj
C
~
o
--
o
Q)
n.
i::'
.c
Ti
Q)
n.
(/)
N
o
o
N
'0
Q)
.c
.!!?
:0
ro
1il
llJ
E
u::
c
Q)
Vl
Q)
ct
ro
Q)
>-
N
I
l<i
.
C')
>
o
>-
Vl ~
Kl llJ
-0. <.9
'Ou 0)<(
<(E 00
Vl-: cor--
Vlro or--
Q)c r--o
.~ Q) ~ <( I.()
~Ero-l~
aJ C -l Q)-I.()
G3 ,g ~ g>q>
EE:~o~
~llJllJO:::;t:
E ~~ 5 VlC
ror--_
.!::::: ..c ~ co :J
LL(/)<::taJO
2
a::::
,~
~~Lt)
llJ I-LL ^,-I
~(J)~ '- ~
Vl
Vl
Q)
C
'(jj
::l
aJ
ro
E
I(/)
Vl
Vl
Q)
C
.(jj
::l
aJ
'0
Q)
OJ
ro
c
ro
>
'0
ro
Vl
(5
ro
E
(/)
~ 1m
Q)
.S? co
ll::c
Oro
>.'(ii
>< ro.S
.- 0
>. '0 -l
c'(/) C
co .0 ._
o.::l'O
E (/) Q)
o~-
oo~
_.co
cuo.
Q)C'"
ro~8
a..aJE
.E
.!!?
~
'E
.0
::l
(/)
cO
~
l/l
al
...u
:g.2:
cQl
'en(/) ~
C:1:J'-
WalCO
._c
-roc
u- 0
.~&~
~-g~
<(roO
Vl
Vl
Q)
C
'(jj
::l
aJ
'0
Q)
C
~
o
C
ro
E
o
,5:
00
Vl al Ql
-~ 5 E
~U5~
~'O~
-l/l-
~~~
~=~
o~c
Oalal
.;.~ ~
C l/l al
roEf;
~~'3
.ca5~vi
.9 E = .9!
~ c (/) c
~e~~
~.~.~ 5
~~E ~
al_U
~E,g ~
<(.E;~
Calalal
O:S~Kl
alE'E:S
EESE
.E-o-c
.aloOro
5 'S W as'
~ ff~~
o ro ..c (/)
e- ~ U) '€
o al . ~
-o~.Q~~
~ ~ C..E; "0
l/l'- E U C
=.!!? al al co
~5-gg-~
l/l -l co al .-
W ro (/) l....._~
~.~ Q) ~ .g
......- (/) en c..
Hl-~~ro
>- 00 '0 0
'Ow~c:2
c~_roal
:,g ~ ~ .~
~~~~E
~ cj g .~ CD
vf.s .~ ~ E
ar~~-55~
E :J 0.= l/l
rot5E.a~
Z:JO!BUl
>'b U (/) (/)
Cl/lalalO
riJg ~ c.i c:
~Evi6~
UoOVl(5.2
cro~ ~
~ c 'w !::: ~
COQ):Ja.>.....
a..E.a.c-,j
(i)c-rol-c
Eec-gro
0'5 Q) co ~
U.Lij~Cii~
~01il0
ro .!::: .0 Ci
..c>alE
jl5 (/) a5 :; al
,0
I
>-
C
ro
t.i
E
<Ii
:s
t5
2
1il
~
C
>;
C
ro
Q.
E
o
U
C
al
a;
a..
o
al
E
ro
z
u"i
'0 co
C Ol C
co oco
- OO'(ii
~ ~'5
al~<(.3
E ro-l C
C-l ..-
.g C g;,al
>0)::1.......
Cl/lOCO
wl{jO:::Ci
3:oc-5e-
~~ro8
(/)'<taJE
CD
C
o
.c
Q.
al
Qi
t:
~
i=
t5
co
C
o
U
.8
l/l
ro
Q.
'0
C
(t
~
I-
C
co
.c
I-
al
Ci
~
o
z
'0
l/l
al
E
co
z
CD
Qi
8~ E
l!)0l 0
N'"";" ~
N~ CL
8~
J,8
~N
CD ~ ~
5,g
ita..
c
~~
'Ol/l
'w ~
ala..
0: Q) Cu
U .a
>5 E
~~ ~
m..9!
at ~
s:~ ~
'0 E 0
rom
5@
O:::$:
;:'N
~~~~~~~~~CDNU")~~
r--
-
lO.......OO<ONOoocooooa
~:gg~d~~~g~g~~~
J;~~;b~J;~~:b~~~~~
~~~$~~~~~~~~~~
r--.NNC"")an.......N,......lOo>~OCOL.()
;;;L08;t:o;g~~~g~~gr::
;; ?:
<(-5 <( c_
x XXf->_co<{~ g~?:
f-_x f-f-::>.~"~.>"-
5t-~ c:--o- <D-o~ _-g~.g~ <D
en .S- 0, ~ ~ ~ ~ .c ~ ~ ro ~ ~ .~
.s U) c: :::1 - )( '0, -s.c u.c cu <n
~~~~~~~5ci5~d:~6~
(ii
c
o
.~
c
Oi
:s
~g~~~~~~~~~N~~~~~m
~ ~ ~N M
o~ooo~omMO~~O~O~~~
g~g~g~g~~~~~g~g~Ng
~~~~~~~~9~~~~~~~~~
~~~~~~o~~~~~~~~~g~
~~~~~~~~~~~~~~~~~~
~~~~~~N~OMmOMNO~~~
gg~~g~Nr::~~~~~~~~~~
:;: I <{ Z
z:;: rI 0 <{~ f-
m~rr r~OI ~~~~~ e
Z~~~~~~~~~6go~~<D~B
c~~5~~~~~~~5~'~6~~~
B~~.~emri~O~Ume_c:>~
~e~~~~~g~~~~~5~~g5
f-<{~II~Zf-mZ~z~:;:~~~:;:
o
o
o
cD
M~m~ro~oa~roNM~ma~~~M
N~N~N~~OO~Nm~~N~~MM~
ro
o
I-
g~g~~~~~~~~gg~~gggg
~~~~~~g~~~N~~~~~~~~
~~N~~~N~m~~M6~~N~~O
~~~~~~~~~~~~~~~~~~~
g~g~~~~~~~ig8~~~~~~
~M~mMN~~~~Mm~~~OO~~m
al
C
o
.c
Q.
al
Qi
t:
al
ro
UJ
Z.
G
Qj
U
to::
o
.c
U
CO
W
Qi
C
C
o
l/l
Cii
a..
:0-
Vl co
::t: <( ~ Z-'
~ - ~O <{ 0 I>> _Z
~ ~~ m2~~ 2U~ZZZ ~c
t5 ~ vi a.. (/) ~-o- - - - -0 Z E vi vi == -, '5 B
eo~~~og22~gi~~~I~8~
~~~~~~i.S~.~~~~~~~g~~
~.~U~~g&~:::15~~i<n<n~.~~~
~B~o~~~~a3~B~jjB~j~
~~Mro~N~~~oNmmMm~Nm~
ro~ ~m~~M~ro~~~~~~v
~~g~g~~g~ggog~~~~~g
~~~~~~~8~8~~~~~~~~~
~ro~roNro~romMM~~~ro~~~o
~~~~~~~~8~~7~~9~~~~
6~~gg~~~~~8~~N~~~~~
mNN~~mmm~~MMmMMro~~~
C
al
l/l
al
ct
~
<{ <{ 0 ~ ~ <{~
~ g;t~ <{ ~()<{U~":~ vi ~~.-
<ti~ - <tiN U ~ oU.(ijLL_~ 11; ~.....l cO ~I
Ol- ~ - <( - <( Q) Ol Q}.- - > E CU LL .:t:: .- ~
~~~~cEUE,!~~gg:::1.....lcO~~~
~~~~~~~~~~~~~~.~~~~~
~~~~~8~~~~~Q~~~~~~~
r--:
Q)
CJ
C
co
c
"
c~
'ro~ (J)
:2.~ .~ (J)
06 ~ co W
C 0. 'g ~
.g ~ ~ ~ .g>
~ g ~ \1) W
g ~ .a,.~ ~ .2
~ ~ tTI ~ .~ ~
.,<l:2:'tOO
g~~8."8~
"'0 ro.c 0. 'x C
~o~~~~
COMMNM<o
"N ~
C')~ <Xl
Ul
(J) .~
u>~~ ~C.f)
_C.f)::::::I 0_
u> := "'0 Q) (J)
.~ .~ ~ 0. ro ~
.~ g{~ ~'o Q)
_ g{.S
c/)c/) 1ii ~C/) ~
~~~ ~cw
Q)\1)C.f)<nC.f)Q)(ij
~ ~ B.~ 5 ~.~
eeEQE~~
.~ .~ ~ g ~ @ g
WWW0I:;::;:
~""'-~N<Ocnl.(')
~~::!~cr;mco
c:'
.<;2
(3
"
.2
C
co
EO
."
Q.
:>.,
-0
<Ii
"
"
o
~
"
o
"
o
~
Q)
Q.
-c:
"
co
Q)
t;
d
Ul
.~
(J) (ij >.
:@ .0 ~ 2
ro \1),~ ('IJ
'g ~ ~C/)
0. CC.f)O"'O
C/) 0'- \1) C
C ~~g~~
~ ~ ~ ~ 'en 32 ~ ~
~ '8> ~ E tTI 3: ~ ~
a :Q .6, ~ (ij (ij (ij (ij
~rgLTIg>~~~~
"" Vi (ii ." E E E E
g 'en.g ~ 6 5 5 5
;o_c....'-'-'-
g "8 ~ 'g>'~ .~ .~ .~
uwwwwwww
~cr;~~gS;~co
~ ~M<O
a;
.s
0.
.0
Ul
(5
>-
.0
Qj
C
C
o
Ul
Oi
~
Ul
~
co
.0
"
0.
Ul
Ul Ul
t co>
" 0 C
~ ~.~
W Q)\1)C.f)
~(ij ~~ai
~.~ :..= a... 0.
~ ,5, ~ ~ -g ~ ~
~tTI8~%.~5
~ Q) - Us ,S; .-g ~ n
Oo.~1iig>:::1-:::1
.~ 01": .1": w E 6. ~
~~~~~gg5
<{uuuuuuu
""'-N.....-mmcom,.....
MN.....-o:::t om
.....-.....-.....-N .....-N
ex;
C
C C 0 '-
~~~~
EEo~
NLO.....- Q)
xVT(;R.y),-
~.9B.9~
E555~
:g~ ~~1":
u.EEEo
U).....-Nl!)~
G>VTVTVTVT
.~ u"i <0 ,.-: ex;
Ql
(/)
rn ooC
5g~~~
.(jj q ~ g E
~g~~~
e~ooo
o..c;;~;
c588g
U'JC.f)OOO
Q)C.f)OLOO
O>\1)~NLO
C...JVTVTVT
ro
O:::~NM~
N
gcooooo
N
C')
gcococo
_N
~
""
ro
~"
_gcococo
:;iN
CJ
~
Vi
o
.sgcococo
~N
co
"
r
l!'J
-<<>
~8cococo
~N
Qj
Cii
.c
-""
CJ
al
.<=
u
ai
u
C
al
.~
x
al
.<=
U
Ul :J
Q) l/l
tf ~ '5
Ul" 0
Q)-U> -5
'~~ ~ .~
~ g ~ ~
co c.S; .:::J:.
5 &'i ~ '-
.~ ~,~ ~
-5 i ~ .~
O:~~~~ ~
o::=.u~-c-
~ -0 ~ u 0 ,!:
('IJ~c'';::;~"O
E.- 0 l/l C Ql
E ~ 0 Q) .2> U)
:JQ)(ijE~~
U)(YQ>.g~2
2 Q; a> .~
-g~~E
m 6~~~
N'D
"'-
~";'J
-<!)
.<<)
>N
~~
ioc-
Nb
::0",
0::00-
0-
LLO::
c<{
0::":-
<(<{
c(/)
Z(9
~E
l/l
"
'"
-e
~
"
0:
00-
o
"-
(/)
N
'"
15
~
<<)"
....-
00
",c
'c
~~
, "
9~
00>
00-0
~.~
~O:
z
oo
(1)00
(1)'0
u..c
oo ro
oo oo
o ~
'- 0
C9E
roc
o
r-
-
o oo
Q:;u
.o.~
E e
~o..
.5J2 (I)
<+= '0
o 0
cto
oo
~(j)
u..-g
oo ro
oo oo
e 6
C9E
2 c
0::::-
r-
'+-
o oo
Cut)
.o.~
E e
~o..
(I) (I)
~'O
e 0
0..0
(I)
m
E
'x
o
a.
a.
~
oo
'-
ro
(I)
>-
l!)
en
ro
...J
(I)
()
C
(I)
'C
(I)
a.
x
W
oo
-E
'-
oo
(I)
(I).gJ
u.. c
oo ro
oo oo
o ~
C3~
_ +J
2c
~::::-
-
o oo
'- +J
(I) ()
.o.~
E e
~o..
(I)
~
o
'-
0..
.5J2(1)
<+= '0
e 0
0..0
o
..-
COCOO'll!)O'lO..-N..-O
CO..-N..-~OCOC')OO
..-COt-COC')ONOOO
cr>oC"iC"il!'io05oC"io
t-l!)Nt-..-ONCOOO
~ CO~CO"-N~
V7
..-
^
O~~t-O'lONCOC')O
..-~ ~C')oco..-l!)O
..-~ N~~~.C')I':~
ON ..-0
..- ..-
^ ^
CO l!)t-C')COCO O'll!)CON
..-C')~l!)l!)COCOt-t-CO
NNNNNNNNNN
~NM:;;-L()<ot::'romo
NNNNNNNNNC')
C')OC')~~ONNOCO
CO~OCO..-~~..-t-O
t- CO O.,",:C'). ~.C').C').l!) 0
NCOl!)COCOOO'lCOO'lO
C')C') O..-~..-t-COl!)
..-CO NNCOt- l!)
V7
ONNNt-..-C')C')NO
t-O'lt-COl!)..-..-C')~O'l
~COO'l..-..- t-
C')~ CO
N~O'lO'lOt-O'lt-~l!)
t-t-t-COO'lO'lO'lO..-..-
0000000..-..-..-
;:'NM:;;G)<O't:::'romo
'f"-~~r-or-or-r-or-r-N
COCOOl!)ONOOCOCO
O'lCONNC')t-t-l!)O'lN
COt-CO..-..-l!)~C')COO
C"iNC"i<oC"ir--:05cr>oC"i
~~l!)O'lO'lCOC')COCOO'l
V7 C')..-C') N
COOl!)COO'lCO~..-l!)~en
~l!)Ng~~~"-~~j
N 0..-
...- vi
.5J2
a.
E
ro
X
W
u
(I)
'0
'-
0..
~l!)O"'-COC')COO~r::.
88~~~8~~~0
~~~~~~~~~O
...-NC')'<!' l!)COt-CO O'l...-
...-
^
c 1..=t3'"
o ~2
~2roro
a.ro~E
EOu:;:;
o <( oo
o ~W
oo
'-
ro
(I)
>-
l!)
=
-...>'-lu
~~;->O=
...-
...-
"><:00
O-g
~m
o 6
cn=
8~
.5J2(1)
<+='0
e 0
0..0
N
o
o
N
o
o
o
c:i
;;;
'0
C
ro
(I) oo
E oo
ro ~
2'0
,-'0
(1)<(
C
~
o
OlC
C 0
.~ :~
a> .::=
.>::0
g.~
wE
'" (1] (1]
:~:{ :~
~-g5
u..('tJ~
~~:g
(1] 0 0
zuz
c
o
~
()
o
...J
'0
C
ro
(I)
E
ro
Z
u
(I)
'0
'-
0..
.(ij
'0
<1l
. a. <1l
<1l 0 u
g OJ a3
to > .-
'5.~~
5 cO 8
u.g-g
i::'U t)
0'0 :J
cofij-g
~ cO 8
<1l '0 .
0:: E:J.~
.,.. ~ ~
U <1l <1l
Cala.
~ (/)~ ~
.- '0 '"
'" C (1]
~"*~
~~~
~ .g' ~
u> C
<1l _ 0
I- 0 .'"
~li ~
s 0 ~
eta......;
Q.) (1) L> C
~~~E
~.~ ~'5
o c: Q,) 0-
"in'~ a.~
I/J._ - 0
'E ~ .~E
W(/)ti)o
'- Q.J Q) U
<::~5
~ ~ u',o=;
~ '2 :; ~
.... ._ 0 0
C')C)(f)Q.
e ~ ~'ffi
C;<<i'~-g
u:a.gn;
c: 0 Q) :J
~ ~ ~~
E ~.~ ~
ot:oc
U 0 E (1]
'UZQ)vi'
< en E: ~
~ E"g E
; 'E .~ ~
oS! Qj "E ~
ua..<1l(1]
a.
"'.....
q~~
enON
~N .
ON<O
- -.....
'<tI{)N
o~
00
'"
o
o
N
I{)
o
en
ct5
-,
Z
'0
C
(1]
>-
z
'0
q >-
(;tz
58-ro
~~'ffi
t~E
~~~
Cii
C
.iij .~
o <1l
~I-
~ .~
.2> co
'" <1l
~4:
'"
.:i. 5
~ .~
~ ~
"'0
Z <1l
t:Q
oOO
a.~
.:: <(
<I: ~
1::~g
., ....... :.=
<(~~E
:~~
.5 ~~
E ro C
Q;'~ ~
I-E~
E E (;
'" 0 E
i~ ~
cn.2m
g .~B
'.WQ)"O
~ .~ ~
'" '0 E
E~",
~~~
! ; .~
~ ~ *
'O~>-
C '" '"
5 ~-o
"- c ~
C:>O<1l
'Z Q)
~ ~ .~
~ ~ ~
C:8.~
;g~~
:J _ (1]
al .0 U
_ '" <1l
.~~~
~ ~ci
c"'~
N
a.
<ON
<0 co
NN
a) cO
0.....
ON
&ria)
0<0
ON
'"
o
o
N
o
o
'"
M
~
I
o
alcD
u.u.
<1:<1:
C C
00
'" '"
2~
rom
q.q.
EE
en en
~~
<1l
U .
&.~
.~ i11
<1:'0
~-g~
oro~
c": E
,Q g Q)
rof"-.~
rove
a.<1l(1]
~:B ~
Q) ~ ,2
Eon;
g>o .g
:g8~
"0 '0.5
'~~ ~
~ E E
o .~ ~
~ 6-~
(1] <1l C
~ ~ <1l
[(;~~
~ g> ~
'5 .~ ~
U <1l (1]
~~~
~'"
. a. .
.2 ~ ~
J::O::o
O~~
oj 'C' .S!>
~~~
ala..>
~ ~.~
o E ,=
U. <1l '"
~elOl
<I: (1].>::
c: ffi E
o ~ 0
~~'ffi
~~a..
~g~
~&~
.- - N
~~~
~~.~
.~ "0 ~
~~o
~ ~iJ'
w2~
~.!;a.
M
a.
'o;::t",-MCOMC"')N
DNMCOOllOCX)
DDDDDNN
~cia5aa~cO
D,-NlOOl,-CO
DDDDD,-N
O"ON~-a>~~
N,-N-Q"~OU')
OOOOO,-N
'"
o
o
N
o
o
o
o
I{)
.....
'"
<1l
U
:;
o
'"
<1l
0::
Q;
ro
~
2
Q)
'" <I:
.e ~~
~ 'g 5
~-5Vi
(1] :J 0
~<l:CD
0>
C
'6
'S; (5
o 0 vi
O:~Qj
. ~ E
~.~ .9
~ ~ ~
~~m
U C ~
'" C (1]
~~~
:.;~:x
c ~.E
g U) ~
'" ~ '"
o <1l '"
al~(1]
-"~~
",>c
C ~ 0
5~~
I-~E
>-elC?
Q.a;N
g-:2 Qj
(J)~~
Q;~.9
1;jco~
::~a.
u;~~
'" C
::oQ;
o-ro:
~~~
:.;-g
2: .-
.s ~ ~
,,-c"O
.E~~
"'",'0
~ g 5
'~ ~ -g
~ E ~
c 5 lV
E 'n ~
QJ 2 e
C) Vi a.
ctJc:=
~ 8;:
~.~ ~
.Q ~ 5
u~:::
E ~*
~ E ~
o 0 .-
UU'O
'<t
a.
~.....O
NOI{)
O~N
~M""':
oenN
OON
-':-=M..o
N"'~
OO~
;;
o
N
'"
<0
en
N
'"
Q;
<1l
C
.0,
C
w
'0
"'t)
~.~ 0
UO~
E~~
~ 0 0
<I: E E
0~~
='alal
C
(1]
E
:J
J::
'0
C
(1]
Cii
u
.0,
o
o
u
<1l
'0
<1l
Eo!
.g Q)
<1l E
a.~
-c ~
C (1]
!:1 E
~~
~.g
- <1l
'O~
5 ~
e c
c:> .Q
elro
.s .g
> .~
e ai
0..:2
~Ei
-e~
<1lJ::
~~
i.g
'" gJ,
~ .~
~ ~
tII .5
"'E
<I: <1l
~S
[i:-g
c~
o '"
'';:; c
(1] <1l
.2' E
Vi ~
~ ~
C '"
- (1]
0;-",
u '"
.s, 'C
OJ::
'O-iij
U <1l
w.r::
I{)
a.
~I{)",
~.....co
NNN
MaN
'" '" co
ONN
oO~cO
NN.....
ONN
8
N
8
a
r--
-g
"
e
"
Cl
c:
'S: Q
~~
c: c:-
$ $
"E"E
.8.8
<<
~~
.2',S ~.!!!
-galc~~I-~
~rng~8c:e
o~~~~~~
era l) ~ U) ~ Q) Q)
.~ ~:> c: 25 .5 .s
oca::>gcgCi
Q:t5~g:;'cC:
C:<Ii'5al~9!.g
:c.2.....9.o~
"E&g~~~~
1l ""~'EQ.c g>
<(~!!"'~J!l-g
~Q)ca"fic~:C
EC:~"''''Cl>-
:coe~~:.c
~1l]-~~~1
E~~~~:g
en"'ai-oE~.E
al~W1ij'Oo1l
''2-6 cu c.!!-g a
::)o~g~~~
!!! t:: c: '" u c: ~
:ns-:2g&t;
... Q. 0 ~ en CO :J
~ ~ .~ Ii ~~"E E
8ciurn.g~o
~ 0 ,S ~ '" " .!!!
a.~~Oj~C:E~
-o.'t:J~ 0)0
~ .... .... "I:: c: i;
~,g.!2 ~ ~.~>-
!'I4;~8.'>.""~
.!:! Q).- :::I 0 ~ 0
19~~~~-oCii
=~g5-8.E~
i .~ ~ ~.E 8'>- ~
o (fJ -'x >-_
OJ''''''o8'gal
u"Ol;--.ccn
'E~ ~'~.E ~~
.!.!!!g~~.;~
C:~~~i~~
.2t5,g~~.~
; . ~ ~ Ul Ul ~
~'2.:r"il.~~::
c:.!9__SI-C:
01 ~cbl!l" .!l!
~1Il~"'iii0o.
E~UlE-511.ailli
<<t....:coc-c(cuu
..."....Q)cQ)"C::J
g'a. ~"3~-51l-g
Q:~~E",iii<a
..,
N
ll.
~~N
qN..CX)
"'MN
~ '" -
00'"
, ,'"
~r!N
NO
8
N
~
ri
~8
11
-0'"
c:-'"
'" '"
....1....1
~o
.oUl
c: ~
o U
..." '"
g~
'E '0
-g .g
~~
~ ~
'" '"
~a.
- '"
:3-5
u-g
'"
:cn
~-g
J:~
~ ~
~al
.g: ~
-;09
c:_
~ 0
~~
8 l;l
c~
00
~c:
~~
i ~
= c:
~~
~~
~~
8-0
~~
,,'Ji
::. ~
fiI_
c: 0
8~
ct;.
;l"'Ul
&~i
Eo;
~ g' ~
C:-=>al
-! .~ U)
I>> c: ~
~ 8.E
'"
N
ll.
<XlN
N<Xl
ON
lOcO
Nr--
ON
~g
N~
8
N
:5
o
06
N
M
Ul
~
c:
'5>
c:
w
'0_
lI) U
e-~ <
85"
>-..c: .r;
c: '" '"
t: c: c:
< c: c:
. '" '"
en > >
. '" '"
::>C/'len
4;
Cl c:-
~.~ g
~~-g ~
Ed:~ ~
~ d: .5 ~
o-(;jc:~
a:~~.~:~
uiu~~l;l
Q) .5 :0 __
5 ~ ~ .~~
en .S! (l) :.;::. IV
al2:::"l;l~
~ ~ ~ a~ .
=- <Ii :g .~ .~ g
'S.~V;O~.!2
~~~ri~al
OIU;:Bc:coE
S CO 'en Q) C ~
... :1: :3 E .2'..:
.cQ,)_::J~C:
I->,g-o'"
~t3~"C"O~
Ogj.g51ij~
:;:S~'U)enc:
~~~'~58
-;-g~~~*
5~iai!E~
1:.!'!'-E~__
~~~8,UllJ!
"':'~Q)~c8.
~~'-.cuE.g.~
.... 0 U) cu "0
~'E5"Offic
=~';:3~g.,g
ucu~-Ci:'::
gJ:Ulai",,~
lS~~[E~
o O"".Q 8. cO
c +:I U) lU ._
o.~via;g'rd
"alc:-o'",,~
~~~~~'O
U)~m~~c:
4> l!l '" l!l ;:dl
~B~~~~
~.E2:'gl:3~
Gu~:.::'::'c:
L~'E~~~
oc::O"'-o
~8~Ea.c:
> o.~Cil'"
~g$~ g'~
sQ's:~'~o
o~uo~E
~..g<<lU"O!!
'"
N
ll.
~~~~~
~~~~~re
~~;:.~~~
<<OVVIO"'N
cor-..,....('I')&t)
NO,....NN
M
o
o
N
'"
'"
M
06
It)
~.c
~l!l
0::>
u.. ,
~ff
.<
en=
:::i:f
~ ,~
~.~~
~12~5
C:Ul~-=>
.E5vi~
-o'1ij19E
=s>cu-8
~.E~-g
O>Ul$'"
'~ .~ ~ ci
~ ~ ci>E;
~Ul~~
::J O)c.o:: '-
u.~ 8. Ul
.5 :g.Q. ~
~.5 c:n~
'e~~ ~
a.. ~.~.~
~30.~
l!Y~~
~~'c: ~
:ll!:!~E
III '" ~ '"
~~E~
~.~ ~ ~
':~Eg
.- '" ~ '"
~-o-.;E
~ ~ ciS
fi~~~
c: 'iij E g
~ &}.:! 8
AI '- 0. .
~-g~5
C (0 c: '';;
~~~~
-0 0 E-rl
c: .~ rl ~
III ~ Cl
ci~.S ~
.: l'U g';I
~vic::s
~gE;
c ~ ~.~
.gg-g-i
g ~g ~
~ c: .-
~g~~
o U ns .
O'svg'lIi
~ Ul Q) "" '"
4> 508 !:!
zUQ:'-.e
~
N
ll.
~'"
q~~
r--"'N
~<Xl '
OO~
- '<Xl
ll:~N
NO
'"
:5
N
8
~
'"
g
.9!
...-.;
.EU
4;Ulx
1l19~
oailf
"'E<
~ c: UJ
oe.:JJ:.
~~~
<wco
Ul
Q)
,~-g CD
Jl ~ ~ :1:
c: "O.:JJ:. .
g~.Q'~~~
ai = g>-g OJ Ci
E~~'--!'!~
5Ula:~~9
'="'WalO~
i:g-'~'5~5
~u~~~u
:cg.!1~vi~
I- Ul l!l ~ c: .~
ai5Ul"''''allli
-ou",.cEEc:
"i g"~~ ~ ~-~
c: 'C: U) en .-
.0 " .S c: Ul N ~
i"O~4)m-gc
Z~E~~l'Uo
.....::..~1je.c:viU)
~ ~S'~~~'E
a.Ulu..Q)<liCl.~
!2g';:;2:'ff~a::
"'C:::>O o(l
~$<Xl1ii~Oai
,::, c,....::J .r-.. >
lS 'g>iii ~~ <Ii ~
o "'al!!a::B;-g
~-gEl!l"'<'"
c>>ro5U)J!f~~
~~'t:-ga::~.!l!
4>'58."'", ,1i
O:J .,....U)1!
4>_C:1- .Cl.
-E ~~~~~ 0
'5i'~Ul<<O~
-o$~<Il.;fCi
.E.s~o", -E
~g'o<al~:Q1
.!:!"':1::1:~ff~
~'OuiO:i}o'"
:;Q)~<ia.lt>-g
- g' 8.0 -0 <Ii.!!
l!e!~~1ij1ij~
;'5-g<UlCi~
E-"'a::.!!1~rl
C:~Ul()-g9'-
eU);~1ii~.E
~~~:5~~M
W.2C:O()Ul-o
LY g '>.a:: a:: c 1ij
<(:;:1ijw:?'"
W u o.() .:! ~ al
W~84;~~~
05u-OwUlQ;
~0l;l50~a
00
N
ll.
CX)vO)co
N,....MtC)
q",":~C\!.~
~;!N::8~
q~"!."!.~
~~~f5N
NONN
v
:5
N
N
N
v
a
M
e?
$
c:
'g>
w
o.~
UlUl<C
~5 ~
000
>oct:
E '" '"
<EE
'" '"
ujtil:i
. '" '"
::>enC/'l
'"
" ~
ni~ ~
~ ~ ~ .~
-5-g.!o
.~ 50..,;
'Ea55
~-g~~
0(1J_~
,:~g<
ro (/) -a..
Ul c>1~ W
.~ "C ; -g
~.gE~
U) .~ C co
5al,gg
~ ~ ~:1: .
~'-4)a:~
"'E -g g'.~ a:
'" '5 E -
~vi.2.g~
ala,g~E
E~ .~~ g
.g-oc:oc:
8.~~~~
UlO~Q-
~ ~ ~ .~ ~
~'~al.E~
65 i: So -';0 ~
,'- '" .,
~5:::tio
~~~~~
CD c: c .- 4)
U'E '" Q E
Sl!l[B~
en c: 0 c: ._
. 0- cu~"
<( u '" E
oalii",...
,;'C'Cti(ij
... .2 al ~ .~-
OU'-I
1::.S'S W Ul
~ ~ ~~ ~
_.c en:>
0~"E::>~
ffiOoB,a
1-:1:5-0$
uc:u..~E
Egiii'Eal
.!E~'5~
c :~ChO
o8(/)(/)f:
i;;;~ ~'o
EB'O~"*
~~'fi~~
~.g~~~
0>
N
Cl.
"''''
"''''
ON
aeON
"''''<Xl
ONN
tD~
...~
N~
8
N
o
:5
a5
i
'g>
W
'0
e..g
oUiO
05~
>OcucP
E ~ ~
<~~
0~~
::>coco
c: Ul_
(1J. ~ c 8 ~
~~.~ -ge!"ou 0
'jj)8a. mCLl~g;'2~
'Vc:E .g..>m:.=(/)"ii
,....~~~{ii8~-58.~
1V .~ ~~ a; ~ a. ~ e '2
<n<<lo<(C"Oc:uQ.:J
o~_ ,~C:oUlcOE
~ 0 E~ ~~'~~g E
~~~~~:5~cu~8
'- CD :5 - E +:J U ~ 0."0
.E'1;iUEo.~8.UlEc:
5 .c~.Q~Ch~8:
~~g~~~~~~g
E 2: :3 '" -0 !! .0 t:: 0 ii
~ i;l.S ~ '" fl! tl 8.a:: '"
-.;~Ul>"'Ul E
1ij ~ -0 :; ~ -g OJ 1ij glCil
-5a.-gc:m::J~'::"i::5
cu~ml'U1ii~E'C.9.,
C5 ~i~~~~ ~'g ~
E ~~'5>rl Ul E!! E!S
~;~~~.~.~SEg
~~:g ~ ~ ~,~ ~~g
el!l-~"'-O ':c".o
a..cuU)E!...:-O)Q)c~
.-O.!'! ai ai.~~-g.Q-:
<al ai E Eal'E E~5
>-0 >!'Ul o.E...... 8.""
:-5g.~~~~~a.~
~s-5g:~",c:i~i;lg
5-g1ij~~~~5Qa
":.:1: ,c:OjEoe@-a
ut U). 0 cu .0)_ 5!
B~~~g'~g<li~~
-;: -J.3 . 0 ~.., .!? =>"
<.1::=UlUl''''''':S-o c:
eX If .u a .!!! U):= .3 <i nJ
_~..,~~:c ~CJ 5
Cl '" " '" E u l!l .- w -=>
-2gg~~~.;~~~
!~.~~~~1ij2g~
a.5~.~.g &5 ~.~"
Ji u '" Cl.'" e .~ -g,::::> g
a...o.Q:g Q.Q)..c:n;"O
o(lQ;-g 8 :il'c.2:..:iiri <Ii
=~m')(c:o"O~-C: .-
~EOjB2:"~EE.~~ u
~'C:'~ ~ .9.S m &.E ::J ~
Jl 0. 8'al .!l! E ~ '" u g -
~o "... c:",-oO
S:>~~:il'2!EE~C: "E
c~ .~~~.!cO),~ Q)
4>E~ 5 [~.-=~.g ci>'u E
en -=> .0 E Ul u .c: '" Q)
:5 g>>~~~= g'.5~~ 10
-i~ ~",cn~ ~~ ~g ~.-
C:"'E"'a..<>:3"'OUl~ C/'l
W 0. "'_>u"'~ co
~ .~
Cl
c:
'0
Cl
~
.E
Q)
~
I-
ll.
<XlV
N~
O~M
- -<Xl
"'ON
~ '" '
00'"
- -r--
~~N
NO
N
......
,...
o
o
N
ti
~
:J
~
2
co
o
~
co
c:
co
::2:
t5
'C:
ti
i:5
co
-0
'C
o
u:
~
a..
Q)
Q)
....J
C/'l
:e
:J
U
~
i=
-0
c:
co
Q)
E
co
Z
-0
Q)
a.
>-
I-
~
:J
1ii
c:
Cl
U5
....
;;
N
8
'"
,..:
~o
~ .~
'g>:(
W5
'05
lIien
oU
U'C:
>- U) -J
ECic:~
< .!I.Q.!I
en :.c .!!! :.c
::i~B~
oi
c:
'C:
.9
'c
o
E
E
~
en
c: -
o c:
-0
Q)~
"u
'> 5
e '"
a.C:
_ 0
<IIU
~-g
'?-'"
.S;; c:
, Ol
>-.-
" '"
<II <II
EO
<11-
~ '"
~'g
- E
.0<11
~ex:
Wvi
.c
"<II
c: E
.!!1 :J
~g
~o
, c:
-"'0
u .-
-.s .!2
Q) &l
00
ti:ui
tf~
'" :J
;:;en
52:-
~~
0'"
""'"
'" <II
ou..
v;cn
Q) c:
ex:g
~g
<II '"
E <II
c: >
o~
~ -
'> tV
tfj'g
- E
l1l <II
~ex:
<D
CL.
....
o
o
N
8
o
o
~
2:-
'C:
o
>-5
'" :J
CD<
'" c:
::: 0
~~~
n8.'
~ '" 5
rJ;t:)
::lE~S
~~
3S
u '"
~~
,,~
c: '"
~ ~
OlOl
" c:
'C 'C:
CD :ll
~.~
5: ~
:J U
.c:e
U '"
:Jl;:;
~~
::E'O
g~
t;;-g
o '"
~g'
'::'c
=c:
'u 12
'" a.
u.._
III 'u)
~~
~~
:g
~ .u)
;-8
;~
.5 r:;~
",Ol
::E -~
'0'0
;~
>o;t
"'.c
.~l
Ul ,
c::::-
~~
~.~
tll '"
0:-8
s~
Ul U
oJ!!
CD - .
;S .~.~
:J '" '"
o <II <II
cn""
r-
CL.
r-
o
o
N
<Xl
o
'"
al
10
"
c:
'"
E
E
o
U
<II
c:
'C:
1) -'
8 <
c(I >-.....~
OlE~
.5< g
.~ <Ii ex:
~::iU::
Ol
c:
'iij
:J '"
o <II
.c ~
>-'"
.- <II
E U
'" '"
-'t:
E 5l
.gc5cri
cf ~.~
::c <=
. Q)
l!!ai'"
oU-a
"cQ
fa ~ :J
g Q) '"
-lelV
.- '"
tll '" '"
:E.c
"i"'Cch
- c: Q)
~ ('Q.~
-g .g ~
'" '" '"
~ c:
E 2tg
'" 0 '"
.aE~
'" <II C
~~~
... '" '"
tll >- ~
~ .": c:
~S~
II:: .'"
...<11=
u.g~
- '" c:
Xl ~ ._~
U_'"
~ .~.~
tll E <=
~:331
8.:;3
Q.o~
:J :J .
~~~
,g-gc5"
Ul"';:;
.- U) c
ell g' 0
.3.- U
'0_
'O=~
C :J
",.0
Ulaiai
.lICUU
... c: c:
0", '"
>cc:
><11<11
.~ C C
1:1 '(ij 'm
~EE
<Xl
CL.
;;
o
N
'"
;;
~
-<
:3:;
;t -
€-g
0'"
Z]!
<>-
u..,8
W"
>':2
ili:;
Zen
en<
~Z
'031;:-g'
5 Q) :0 :~
",,5<11<11
~o~~~
~t)gn;E
v [''::.r:. tV
<IIE&l~~
.~ ';V 'e- c:: :
&i .5 Co ~ 1ii
liE~21~
o..~.r.!9.r;
g"t:J.!!! ~ ~ .
o Li"a.o:: ~ ;
"'0 Ee>.-a:
~;8:;~c
Q.cnrag>>cuQ)
g E .9 .~ .5 ~
U~al'O~g>
cUiEg.CC:
S~oN8~
g':G1i~'O(j;
- ;t a.._ '" -
-;-~U5~
ca'~4I~'~Q)
~1i);t<ll~1i)
-:J m 5 c: '"
-g-g5E~:;
~~~.g~~
- U)_u'::::'
>'S!!lcnQ)~
1l~.g~:g-g
;2",.-:;;t';;,
i a; ~~g.c:
(/)(Ql'J)-Em~
<o--oE"8.
z;;.ffi&lE~
- '" a.1I:: .- <D
g;tcC:~"
:;~Q).g;~
:J""S~c:..
ia&l"'<II'-CL.
>:s'~c:.5<
Wo ~Een
CD-iD Q,)O)
e>>~RjSij.a
""e-;t:G~~
-nO"*:;....E
5~~8~~
QI e'!I!~~E
"'<v=..-ev'-
XI.cc......r:.-g
~.111 0 <IIo>.l1! '"
_"'0(1) "t:J0)
.!(ij&g>>t;j.5
;'.sl;;'~-.sg.
:s(l)J:v(l)a;
'O~~'>~>
..5 .5 =s ~ .5 -8
'"
0..
....
8
N
o
o
o
~
N
~
o
CL.
U
'E
.9
< ~
:ll ai
-'" :::
; 1:' ill
>-",,,,
.~ ~ ~
~8~
"
<II
_ 1)
a.c:~c
UiOi!!2t
~:5~
,::..ffi,,~
== a.ffi-g
~ (j; 5 2t
u..;t""<II
&8.~-g
l! g"E ~
O:;:::l:....ra
en'~ ;'0
"ii ~ ~ g
~5~'11
c'O=s
8.,"~~
cn:gz8
" c.. lU ....
i=6~.g
c:"O:Et
.g;~fr
~5B~
e~alOl
:I~'3'2
g-8~~
~ - >-.-
05t:g'
'0 "" 2t <II
c~eg'
ftS .- c..
8'~~~
c c: "Vi e
.2~5c..
:ll,,(j;-g
e-g~~
E '" -.5
o C)(i c:
~~ -g .1Jr
00",<11
<;'en ...:~
tj .~ ~ 5
:I E [~
1I::?,'s-g",
;0 g-~g
~ . -g "~
i.5~'~~
tll"'II)<II~
j::E;g5~
i:~'Ot!
>tn....~.9
!~~:~
~:>gQj!!l
::E>c:ct:u..
g
.....
0..
;;
o
N
8
o
o
N
c:
o
'iij
CJ):~
'20
:ll~
c: '"
'g> 2t
W~u
:320
:f: U c:
=Gig
~l'CI~
-E:c
'" E '"
~ons
zu:;
-~
0"2 -
4Jra8~ui~
C)J:c ~C)O
~~~g.5~
~~!!"~~~
'; :?;~ ,g.o ~
U E ,ia
al cij Ol.!!l .g .5
:23'.58gg
>-J:J:(I):':
d: .~Lg> ~ ~ E
.:E:Bui:G<o
g ~~.~~~
tl c:'o; ;gg -5
:ag-g.E';(1)
.!!! g ra (I) CD 0
:;~~~~E
~5~ij531al
.2u~uiu;-g
:~ .~:~ g g
05rE5}l1l'-
CD....<UOcn~
.lICai~.c...o
:g",o~:;
Q. '" - 0 .
=c8~Q.~
Q)~C:.~u;.a
.c._~<=tlu
~E~~~S
~ui"o~ra~
~ ~ ~~ ~ fij
.- c: !;! J!l
.5~ga.8.~
=C)~cn<UE
'j.5g-g~1i
1A-g<u('Qu~
gg~~;(j;
i;:i~2~~
g<ll~!,lO"
-;;.~ tI1 ~.~ fij
5~S.g.Q~
ig'~.5~i!!-'
>'C: ,C=:<II "'.~
ci~Eg~~:g
tj"5~~!oJ:
~ai~E"'1i)ia
tll'O-aialc:ili
cnC:~41:;8.z
c "'-.so!;! "''''
.gC:&lc:ilS<II"
~~Qj8>.~g;
~2-oiE~5
~(jj~~-8~~
88s:eL~~
.....
.....
0..
'"
8
N
o
o
N
~
(j;
<II
c:
'6>
c:
W
'0
"'1)
~~o
UCi:::!
~!~
<~~
uiEE
. '" '"
~CDCD
.9
Iii
>W
~~
i!! 0
Q)C
> II)
'en X
o <II
a."
>( c:
<II '"
-g2t
'" >-
Q)-
U III
c: .~
~4;U;
"oo~
o~~
i~E
EU~
I-g(i
.g .~ (ij
cf ~ ~
. ~ E
-g<o~
..!cn.!!
~8,e
'" "C :G
::E .Q~
aim'O
:2.2-8
~ ~ 5i
a: ~ E
.t'2 g
cal&l
o c: ...
tS .~ ui
<II)~
ia al .~
>"E
~-5~
.. c: '"
II::-:c
w:C ~
~~&
~8~
~ ~ E
a.4J~
~ ~.~
'tI ~c
i'ii ~
3 8.~
Ii c: E
cg~
"Euo
o"'U
N
.....
CL.
10
o
o
N
o
o
o
.0
o
N
~
:ll
c:
'6>
c:
W
'O~
e..!2 cJ
00
Uoo
>0 C C
E <II <II
~EE
.... '" '"
ujoo
. '" '"
~enen
(ij .5:!
c"~ ~
~~~~"
~~g;;~
f?~U.3Q)
Q) :J '0 l1l E
~&~~-g
"0..; .. ~ ('Q
<II c: al.O' '
E ~~ 0.0
.gEE"'O>
Q.lit)O,!!
a..~~~uf
"C>>"O'2CD
.! Q) c: ::::>~
E:;Jg E ~
g.9~g1E
r;tI1~UI-
u~fij-5:;
g~~i~
~8.fijcj
~5~.!!!~
~ c ('Q c..._
-;:"0 a.Q) E
~@c~l1l
... E.g 8.5
Oo",,,,u
~~ ~ ~ ~
.~ ~~ -g .~
Gi .5 ~ ra ,......
e.~ii~'O
'0 > ;t E c:
-'Etll~~~.~
I- :J 0 .-
:;C~"i:al
>0 '" c: .- E
Eti=g!
<~~.g~
c:c:t::Q.>
~~ing
Eo..-g.s
",,,,alu.
J:iiRi.5..!!?
tf~.g:c'~
III > >",,:e
~ '" <II'> 0
5 .5 ~ U E
u:5~~~
u~",<IIc:
II:: :3.gt3 (j;
l!!.5,2 ~ ~
o <= 11)'" C
.... it) U C en
C en (I) 4J ::J
tll III .. E 0
E '" (l; a.'c:
l! 8. i' ~ ~
~~ia;-g
Cl)1-_"Ora
..,
.....
0..
;;
o
N
o
o
0.
N
~
'0
c
<II
~
'"
a. >-
>-~ g'Z
EEtiE
< 2 ~ 2
,0 cO
~u::8u::
Q) Q)
u-"
c: ~ c:
'" '" '"
~ ~ 5
c II) ..,
.~ rn g ~
",,,~'i:
_ v c .-
w > 0 ('Q
=ouc
V>>.('Q
;t c: u_
~';3 5i ~
.~'~~8. "
~a: ~ ~ ~
~~-gc:~
fijB~~.!
vi~:3>.ia
ccn;g%:a
g ~'u <U v
",,,,,"'''E
>._ - 10.
o ~ v..E 0
fii::Jrd~~
1-~-g..Q= 0
cracno~
o .::1 <0 U
u~.g-;; 5
:JU"'Ol'"
~<O>(QC
~~~g8
8~~~~
~~€o';
c~.25&i
E'o; i!! "" '"
Oi-C>>Ov
i .g .5 ~ -g
^ ~"Ocng
~ 2:- :J c:
~~g8::J
<;~._~~~
>"O"S~~
!:~~~u;
~~5~5
~ns:;:::l:i"""
ElVOcn~
2~S.E2~
o .S ~ a: "8
~~8-g~
....g-gu~
III .- '" .5 S
!:! ~ c: ~ &l
~u.2'o_
tll .- "':; III
en~-8.-g
6U)i5~ns
t_4)-
tl8.""O'~
5 Q. 4; 0."2
ut ~ ~ .l:: ~
g-g.o~&l
u "'.20... E
..,
.....
0..
;;
o
N
~
~
'"
E
~
~
en
>-
~
<II
c:
W
c:
1::
"'z
::lE.....
~g
J::'g
-"'-",
g '"
-,0
~ ~
~ ~
.g ~
~ ij'
Q) c:
<II II)
.~ C)
'" '"
~~
~~
~-g
8 '"
tllia
:2 ~
i!)al
0:';
Qi-
'0 vi
'j ~
g~
.. Q)
'" '"
Zc:
tfg
III c:
E ~
o i!!
ua.
Ul c:
B.g
~~
Jl8.
!-g
c '"
~ ~
c >
e 8
>~
an ~
5 3
t; g
< i!!
:!g'
al"g
Eu
&!.~
s ~
Ul U
~ .~
Ul '" .
5 g'~
'0 .." ;t
...."'Sc
a~g
::c8~
on
.....
0..
OC).....on tON,......O)N ~~<Xl '" ~<D <D~....'" ~~~~~ 0<Xl~1O 8~co~ "'<DN
Nl:l::' ..-.q-o)Oa) ~<D '" Nr- ~q~~~ ~~~~~ "'<D<Xl
OOO-N O~N O~ ON qq~~~ OON ONN
;!Q$~ .t":m"":"":~ MNm -N to cON tOMN"':'" a:) to <0
"'N It)('l'')NlO,,, C;CO"'C)(C('l") lOMmO)",
......C"')COOW ....r-'" otO ~<D<Xl ~~~;:~ 0"'0('1")""'(1) _N('l")W ~ O~tO_CQ NIOr-
gl:lNN OOO-N OON ONN ~qr:~~N qq~",!~ OOO_N ONN
Marioi iC'"i~":": gN".o ~:: ....:,...: NOCO-N .-M(")lOCO Cft--.::tWN ~ggg ggg
..,......., '" ON 10'" ....10 r;o~:: ,....NC')NW ""'N-tO
gNN OOT"""N gON g gN oOO"'N OO......N 0000 gON
a
a
N
.
a
a
M
cD
"
<J)
e
o
5
o
en
::::l
0:::
I-
~ ::2
5 Z
.<: -0
'" '"
.~ .0
- <J)
~~~
3::--,u
.
"'~
~:5n en
u c ro .S:
~::JOOl<u
-gg~~ro
O::J.....a.::l
U (/)"C . (ij
O. (/)Q)C >
u 5 ~ .~ ~
')(:.e~c;
cv -g ClJ W Q)
:!: 0 'i" E '0
;: U <ll :J :J
Q) .~ ~ ~ u;
Z g> 2 .S: -5
-g~~TI~
~ ~ ~ .~ .~
to:.g-5~
UQ)cuw-c
.;..coE.2
c: OJ .~ g g
~ ~ E C}~
o~~50
= -E g> t; 3::
~Q).QS~
.g ~ -g U)oc "en
~o"'u~
O.....w .9
~ ~ g> & "Vi
Q,)'_ ..... _ 0
(;)3 ~~ ~
~~~i~
~E~:2~
uO-~Q)
~~.Ec.~
~ OJ IV III -~
'5~~~~
a.Ca.c~
Q.COooc
~~fr~'~
(ij .- ro :J "\:: Q
c.Q~~~>
E~~~ffi~
e ~ .* .~ gl ~
'S; Eo. .E :s ffi
e .(l, U 0 ~
W Cii ~ ~ 0,,;:
-g "5, Cl) Q) -; ~
coo..cu;..c-
-O-(Q(I')(/)
~OJo~ ~"O
'c ~.~~.~ 5
"5 .~ "G .~ ~ ~
! c "S; E lJ) (i)
g~~-g-g-g
C)<ll_"'''':J
to
...
.
(l,
0),....0,....(0
q~~~~~
I.{')('I")O>OON
qqb.~~~
S;~t!~~N
oOeON
a
a
N
a
a
a
o
N
ci
8z
ci
uE
e <J)
'" e
--' ;:
",0
-l-
e ~
:J <ll
0-
U<J)
<ll
e.<:
'" U
<ll e
U '"
0::2
C
<ll
E
u rn
.~ ~ en
a.. O'l~ ~
. .s:~ ro
~.~ ~ ~
'-.....~o
tV W . a.
""") a. c (/)
;: c 2 '0
QJ 0 U C/)
z~2.9
.e: g ~ ~
J:: (/) 0 (J)
tI) Q) U ('IJ
~.~ (i) ~
oro~~
~.~?;- [
~-5~~
:g 2 ~ >.
J::O.....C
U OJ C 0
e '" <ll E
'" . E-'"
:2:~ ~ ~2
~a.~t::
u..... ro Q)
'E ai E ~
~ ~* ~
g'~ ~ *
"i: a>~ E
~~g~
c~ Q)
.~~~~
Wc~u
"'0 co Ol-""
~5~g
(ij ~'o. 5
~.~~~
E~a>:o
g.5 ~ E-
... (.)..... w
.~ 'g~ ~
W (5.~ (/) .
=~~eg
~~~gB
j E.~ ~ "g
~~~~~
.~ ~ ~~ E
Q)-occQ.J
.;'02.!l!E
o.-8.~ i- e
~ ~ 8: ~ .~
o.!: ro~ Q)
......
~
(l,
M"'>f""'>f"N
NlO,...-CO
OO,...-N
aDMr-:ci
T'""MOlW
OOON
cncrim...t
O'INf'.,.C"'l
COON
"
a
a
N
a
a
a
o
N
M
",
'"
;:
.<:
'"
I
~
~c<(
:J<ll::2
{j E .
'" t:: e
(/)roB
<J) a. '"
'" <ll 0
::2 0 ell
'0
e
:J
~~
=>.<:
g~
o~
e e
"''''
.~ ~
O<ll
.C
'" --
a;~
~-g
.c <ll
~.5 .
(/)Q)~
VI.<: '"
:1;1 :;'g
. a <J)
e CJ) <ll
.s ::::,_l/)
VI <ll ~
~!~
'i3Eg>
,~~ Q)
0",'0
~ - e
Q..Q}ro
- '" .
'" :J <J)
e.<: e
e U 0
:1 ro '';::;
..... ~ ~
~~~
t:: ~
<(:2u;
- :: .,;
~Mffi
eCJ)-
C1.I ...!.. a.
U ';::Cii
-g~.a
5~o
~ ~.Q
-x-
:111J ~
~1ii~
M '" <ll
~~ll:
&5ti
~~ 'S
"5-50:
~ '0 ~
.s 8,~
a::ii:::
:::~~
~~ai
....!. .5U
CO
~
(l,
MCO
N~
aN
~c.ciN
N"CO
aaN
"":M
C) M
....a
a
a
N
a
a
~
N
<J)
Q;
<ll
e
-0,
e
l1J
'0
<J)
a. _
~ U
o 'C
U1ii4:
"'0 >
E~..:.i
4:00
0'5'5
:Jzz
<ll
-g a::-5
ro C <( 0
Q} E ~ oC/)-
..c,-Q)C~-=
~<(~3~~
~~ ~ ~ ~ ~
~~:!.~ K~
c3~~.cg-~
~ ;'.9 m ~ ~
.~ == (/) '- ro ~
~;g5.E()~
a ~ ~ .* ~ ?:
..:.:: 0 C >.C/) Q)
og.8~::>~
~~ g>~~~
z 0'';::;;';::: '0 Q)
~ro~~~co
~ ~ ~ OJ.~ ci)
C1.Iroo:g::cOJ
~~""",l/)ro..c
'a ~ ~ 8 m s
~aJ~~l/)O
o ~ ~ ~.~ g
~~ ~~ ~ ~
o3~:;g,;
u2~~'05
E g> -:.'~ ffi ~
~~~a.co.Q
.-O:::'OE"
~~ti:~.Ef'-,.
=' .Q ~ ui.9 .9
t~::::lC"'E
8..2:;E:6 ~
g.~ ~ ~ 8 e
~:::E~~~
u.EE<{'ON
~E8~~~
:a~5'c[:E
Ega.€~'O
o,-o..oo..Q)
u ~~ ~ 5 .Q
T9~mo'~~
~ -; .2 ~ ~ ~
E g ~~ E ~ ,
5~a::~B<c~
'~~5~.g~o;:
Jja..~:Q~~a::
:'!:6~~E~;:;
.g2~~m.g::::l
OOQ)u>~-5
Z Cl.. a::.g.!: I:::
en
....
(l,
IOMCO
~MCO
OON""-
~ ~ ~CO
'Q"C"'l"'>f"N
o NO ~
Oo,...-co
- . .f'-,.
~O>ON
....~CJ)
....aa
N
a
a
N
a
a
a
~
......
<J)
<ll
U
'5
o
<J)
<ll
0:::
Q;
n;
3::
~
Qj
<J) 4:
E~::2.
~ 'g 5
~-SUi
'" :J 0
::24: ell
~ .~ g ~ g ~
t~g~ro5
o g.;:. C') C')~
~.~ ~ ~ 5 ~
~ .~ ~ E ~ ~
~~.E<5~~
~.~~i~~
-g 5 ~ E ~ .~
ro:'=COJl/)l/)
~ E 8. ~.~ ~
.~::: ~ ffi 8 ~
~~Q)~~8,
1lJ Q) .~ c '- '0
1"O~roe:)
~ .~ ~ .2 ~ ~
~a.Q.lrn~~
.~.~ ~ ~ ~ 5
O:~~~Eg,
vi~~~8'u
;2~~m~
(/) '- E ~ C 5
.E~~3E~
g5g.g5~
~ w a. rn .~ w
caO NE:,o.......
:E ~ .;g ~ Q} 3 ffi
cOc":'O<llC
o5OJ~ffi=,-
U;31!:E':~~
S '6 : '0 _!!1 ~ g
~~.Ero~ffi5
Q)el/)5Uia.:;:::;
'e ~ .~ ~ ~ ~ ~
n. U c: '" -0 ~ e
c.9~~~~~
0) C C 0 l/) Q) 8
S~2:ii i5t~
~ c ~ -g ~ ro 'cr
'-Q)a.rn~"OC
I-E~(/)C')50
-grn._Qj~~-g
12~u2o)(J)ro
~:::ffi3~-g~
~ 2 C') Q}.-:: co ~
C1.I co.!: ~ E ~ 0
O~wEQ)ro'-
'- w ~ 0 c..S ~
~rn.-.......ma.~
-~~~c>.""
~ ~ ~ ~ ~ .~ .~
5:E~g>5~ro
V;,...-:Qc.~oE
o -.:i l/) rn E: >...g
m~~EQ)~l/)
a
N
(l,
,...-NMf'-,.
q~~.~~
C;~~~ci
~~;J~~
~NLO"'>f"
~OON
10
a
a
N
a
a
co
o.ri
<J)
Q;
<ll
e
-0,
e
l1J
'0
<J)
e-t)
8'~1lJ
EO~
<~~
'" '"
~EE
:JOO
Z:-5
='(ii Q)
:e 'u .!:
~~Qj
.!! vi ~
<lle-"
~~~
g ~ OJ
-- '" E
'0 > <J)
<ll <ll <J)
~~~
~r2 ~
~ <( .~
.~ vi ui
c: 6 e
~ .~ .g
'0.2' ~
O)wm
g>~~
~~m
ro .!:!
ti~~
'S ~.~
VI ~ x
oviE
caCui
-;~~
c5~~
c:~Z:-
';;; ro~
C:~ro
,2 '(ii co
<<; ~~
g~:
--' -E e
~wg
,g a.~
~ ~ ~
vi':a 1::
0)30
U<J)a.
'~t) ~
~ [~
CiiS -g .
~ .~ ~ .~
EO.......'O
C:5~~
~~Em
'S: Q) 0
c: ~ E'o,
W._ ::J 0
~2g8
q,(/)'OQ)
N
(l,
LOCOf'.,.OCO
""-WO>NCO
OOONN
...tMcicxicxiN
OC"'lf'.,.~LOCO
OOONNN
rDcxirri...tM
~Nf'-,.~LO
NOO,-N
M
a
a
N
a
a
a
o
a
N
N
<ll
U
'"
a.
en --'
'0 lL
~ Q}
<J) C
U <ll
5 U
'" <ll
e e U
~ g [
<(~C/)
(ij~€
e e <ll
2 -E 2
'" '0 <ll
Z4:~
=>
'"
e
~ .~
<( C') ~
Q) .S: CT vi
E ~ i.~
E "" Q)
<J) -g, E ~
Q)CO)l/)
.~ Q) 0> OJ
~ ~ ~ g
(/) .- ro ro
_nEe
a} 'u >. ~
E -~ Qj _5
~~~ E
~EE~
~Qj.g~
g>~ ~ ~
.~ E di ~
Q) I U ::J
0..0 C c.
olO"'E
~~~8
.:;: c.!: -e
e-~~8.
(l,e 'l-
~~~~
'0 . <ll
';:: ~~~
~ -~ 2 ;i>e'
o ro ._
'-~ Q) 0 l/)
cu (J);';::: ='
c:Q.l:02
Ucu~~~
-" '"
~-g~~
~ co'~ i
~g;E
al~-gg,
c: Q} 0 co
~ .s E ~
~ '" <J) E
E6-
~go~
.!:1iii ~-:
~~~~
rn cD -Ql-z:
(/)u.~Q)
5<(ul/)
:;:;-",og'
ca 0 -.-
[~ ~~
O(l,E-:
lUQiffig
~o g.5
aJI'Ou
N
N
(l,
COO>"'>f"O>
o "'>f" 0> co
OOON
lric.ciMrri
OMO>CO
aOON
&licio~
M,...-LO,...-
Noa,...-
a
a
N
N
10
M
N
'"
'0
'"
e
'"
U
u
Q.
~m
",i!!
wc
eo
E::2
'"
<ll
-0
~-5E
.3 .!: ~
<J) _ _
~ffi~
~n:B
<J) _ '"
'" e e
<ll '" <ll
';Ci.a.
-S Q; ~
.E~:::;
l/) a. 2
<ll 3::-5
-~::2 ~
Q) tn .-
~N?3
ro""- .-
5~~
.u) 0 ~
<J) a.-
-5€'O
~ '" e
~Uig
muca
-gffi~
-5ic~
'c.2 l/)
:J .~ 5
lL<ll:J
cO a..!:
-g~g~
~-i~~
u~J?Q;
...;C~~
:ii 2 ~ 8.
a: 0 0.'0
0) .s ~.~
:1l/)- '-
,~5 E B
'::oro'O
U'O'OC
-tffi*:
~ ~ g ~
>-'Vi 0:=
:I:Q)o!9
Q)'O-5,""';
~-g:e~
'E~E~
(g Q) r--- Q)
.c'O'O;:
~-gffi8.
I ro C')u
~m53
I .3 - 0
;2-8~
.Eg~~
U8(05
M
N
(l,
MCJ)
MCO
aN
u->~
N~
a~
"":0>
-or......
Na
'C
C
Cll
QI
'C
.~
Cll
QI
~
c c
~ 0 <t g -;;; E........
:;:: ~ :I: u w 0 (/) ! (/)
.:::l (/) u "0 U) QI (/) U cuE a; Cll C QI
~ 'C @ QI m (/)~O ~ ~(/) m ~ ~ QI E ~g~
al ::l ti a, g. g> g(/)o .~ C - (/) 0: 'E ti a. 'C ::l'-
~ ~ 5 ~~ ~~ ~u~ ~ ~g ~~~] g>~ ~ Cl ~@~
~ 0 ~ ~QI c~ ~'C~ 0 ccll o::lo (/)~ ~'C > C 0.....
a. (/) ~~..... -0..... E Cll'C 'Co~- ~~ QIQI QI :;:: "'~Cl
~ 'C a. ~~'E~ ~u Cl~OU) U) .....~ ~~2~ ~o (/)~~ 0 (/) ~O~
C ~ ::l ~~QI'" 2 C~..... Co ~C""'Cl ~~ QI~~ >. 0 ~'Cti
o _ U) ._ == E cll !Ii ii5 :: 06 .. a; 06 QI u.. .. cll U) C cll .. u C =:: U Cl C QI
Cl C C ~ E ~ a. ~ 't:. . ~ (/) ~ 'C ~ ~ E .. C ~ ~ '0.. u.. ~ .;;: W 06 ~ QI 0 cll t:: (/)
~ ~~~ ~u..3~ cll~ UECll~ 'C~~~ ~u~o. 06~ ~cCl E ~ "O'E~ ~
>; ~ ~ .. cll ~ Ci 06 =:: e:. C ~! ~ u 2 .a ~ ~ g ~ ;n QI ~ Cl ~ U) 0 .: E ~E ~ (/) -0 QI ~ ~
..... =o~ ~cw ~ - (/)QI<t 'EU)~::l:;::~""'o. c- c:;::t 0 .!>.ECll .....
'c ~ ... . 0 06 .2 cll ~ ;g ~ ~ ~ OJ - 06 ...... cll C C U) OJ (/).2 ~ 0 ~ U ~ ~ o.:I: ~ ~ U)
::l (/) Cl ::l C :;:: QI 'C ~ :;::::l ~ :> C ii g U) ~ 'u EQI c: C 'C E ..... 0 a. cll ..... .- QI . - QI QI QI
E c~~ OUCcll ::~ >>.:>- E(/):;::~:;::c Cl:;:: ~~! uo.o.~;nU)~o~"'~ (/)
E -. a. ::l ~ :;:: ~ .- ~ 'C 'u - 0 u . - ~ QI a, U Cl::> :: g 'iij ~ 00 :I: ~ & (/) ~ .0 ~ 06 ;n 06 u ~ . - ::>
o !~~:;::~~~~~cllC Ua;~QI .....-Qlo>.(/)...QI-a.. - (/)c~::l~(/)~ ~~~ 'C
.- 06 U) :: QI U cll cll cll u.. 0 ~::l ~ C (/) (/) = "0 Cl QI .;;: 0 .. a.. ~ U) .= ~ ~ U) QI cll ~ ~ 0 a. QI C
~ ~ u~C ~c~ci Cicll~ ~oQl~QI...tic-Cl Cl-QI ~~U)~c~Cll(/)(/)o.5 cll
Cl ClCl:;::CllQlo6 _o..o_~QlQluc 'oJ~QlCllWCll CcllC "'" -""'QI-C::lQl::l5 ~
C c.: CllEu..~ (/)~~~i= ~~..t ..W (/)~.~ QlClo6~~~ ~'~(/)'E~,g Clo6 (/)~~ (/)<t 0~U)~
-.0 -"'c::l"'oQl.o-::lo(/)>'QI"'E -QIQI E CU"'QlcQl ~...... cCl
c~cE::l~Qlo Cll......Cll=::O_...-_::l Cll(/)"''C~U -E a. :;::~QlCCll:;::QlQlQlQI'CCl~
~QI~::lQl(/)~(/)]'C==u~==(/)'C~~'Cu~~==~::Ql2~'C-~~~(/)~~c.o::~~~~c~c
_~__COO~...CllCllQlQl~QlCll_Cll::lQlQlQloooo._::l::l~_QluQI...0::l"':;::Cll:>:>:>5Q10
a..ii5a..a..a..a..a..a..a..~~~~u..~~~U)ii5U)U)U)U)U)U)U)U)U)ii5U)U)~m~~~~::>::>>>>>>oN
Cl (/)
c:: ... (f)-
(/) :i: C QI U
Q) '- (1J :e.....tJ)
~ cll Cl ~ 0: _ ._ W ~
.B C c(/). _ ~ Cl e ~ QI '':
~ W ~ g g>g> ~'E (/)u.. ~~
~ ~ ~ ;e ~.;;: E ~ 8 g> ~ ~ ~ QI
U ~ ~ ~ ~~ (/) ~~ ~~ C =~ ~~~
2~ ~ ~ 0 ~'C QI:;::(/) ~::'EC ~QI i~i ~
UC Z U) UClQl~ ;e ~E(/)CCllQl~ u..~ -CllQl QI
::lQl ...co.- ~::lUCll::lEa.. ~QI~aQl-
'C 'E QI ~ .- >. 't C 'u 0:: '- .- ~ 0 E... ~ ... (/)
o .- C ~ C ~ .- 0 cll -=.: ~ .. ~ ~ 0 ~::l .!!! ii5 >.
... cll cll QI OJ C rn <t :;:: u.. .!:: E E ;n ~ ~ cll QI e U ~ ;n 0 . _ ~ U)
~ g. ~ c~~;n ~~ 'EO?Cl(/)~~Clt~!E;n~u~
ti QI ... C .. :;:: a.. Cl - ... U QI 'C ~ C (/) '" cll ::l QI .- ::l ... 0 _ ~
QI ~ a.. Cl ~ cll (/) .- ~ QI ~ 'C C C ~ QI ! .. C 0 ~ ~ QI .2 '': W :;::
...- - ~ -E~'" (/) (/)-oa.._u(/)c-,. ...(/)..._.w
o ~ (/) 'iij:;:: ::: I QI QI - (/) U .- 0 cll Cl cll 'oJ . - <t ::l QI .;: (/) C
u..QI EQI~ a;QI~ii5 a.....~!QI 06~"'>~~'C~ ~-X'Ccll
~ > _ 0...., > ti <t .. 0 ~ ;n (/) ..... a.. > QI C ._ QI 0:: .= W - :I:
""'.- .;: U __ >.._~ -06~__ U---o '.cll'" o..---QI (/)
>.(/) (/)-(/)(/)Cl'.U)QI~ Cll_O::ClC-CllCllcll C Ocll(/)ClCl~-
~ QI >. ~ ... QI (/)'W.~ ~ .. C QI ~ E '.5 E ... .2 ~ ~ U .~ C C U cll
(/)ClCl(/)U)o.O-~S~~ "'-~-ECll(/)(/)(/)~~~"'(/)~:;:::;::-~(/)
QlCllC~ Cll.o=::--~~ oo.QI(/)t"'::l::l::l"'Cl-O'C...~~~QI~
~~:i:al~"'~==~~ClCl(/)ti~!gCll~'C'C'C!-'C.oc.oClCl-~t
u..~~O~~:I:~:I::I:II~I:I::I::I:~:I:.=.=.=.=~~jj~~~~~~
00
......
o
000)
MM
00
~
-
.~
QI
(/)
::l
...
o
....
(/)
...
QI
.0
E
::l
Z
QI
'C
o
u.....
QI.....
i;:'C
e ~
a.. 0
QI.....
U (/)
C C
QI 0
Oi: ;
QI (/)
o.QI
X ::l
WCi
O)O.....N MV on co...... 00 0)
......00000000000000000000
00000000000
MVon
000
..... ..... .....
......
.....
.....
co......OOO)O.....NMV on co
OOOO~~~T""T""T""T""
T""T""T""T""T""T""T""T""T""T"'"T"""
V on co...... 00 0) 0..... N
0)0)0)0)0)0)000
000000...............
O.....N M
0)0)0)0)
0000
(/)
...
o
>.
QI
>
C
o
U
C
o
:;::
t'C ::l
oQl (/) (/):f!Vi"
o.~ E C ~cll
(/) U ... Cl o.!!! ~
~:g .g .: Ii 0 06
~~ ~~~ ~ Cl~~
;n d> QI :.c cll - .: cll 5-
~... ... U) a.. Cl.!:: .: QI .-
::la.. 0 -cU....Cl~
~ (/) u..'. (/) ~ ~ cll ._ QI QI cll >.
.~ 'C .. C ..... '1 QI '.5 ~ a. a:: ~ ...
a.... (/)OJc:t:-(/)QlU).__.....
e ~ .2 'iij ~ 0 g ::l .: ;n g ~ ~
~ C ~cn~ 0 ._Z~ ClC:;::~ 0
.. ~ 0 - a. ~ .. - C .2 ~ ::l I..f
>'U)- (/) (/) E::l (/) .-w~ ou.. (/)
Cl ~ QI Eo..... .~ (/) U C - (/)
.2 C QI:;:: QI U U =:: OJ._ ::l a. 'C 0
o OJ C .- ..... QI - C ~ ~ xc...
_ 'iij .- == (/) ... :!:: 'u ~ a. 0:: W cll U
>. cll QI ~ ~ ~ 0 ~ cll == cll .. E E -
ClEo~u.. (/)~u..::lo,QI (/)
...:: "'" ...QI.........~OU::l::lQl
::lU>.OJQlCll.........Cll CQlQlc
=o~c==~.a-QlQI~Cll"o"o::
~ 0 .<.: 'c ~ 'C U ~ ~ .~ QI .g ~ ~ QI
QI .- == .- .- 0 ::l cll ::l :t: U ... QI QI .9-
~~~~~~~zzOOOa..a..a..
U)
Cl
C
'':
QI
QI
C
OJ
C
W
0..... N
VVV
000
MVonco
VVVV
0000
M
co
o
.....NMVonco......OOO)O.....N
on on on on on on on on on co coco
000000000000
V on co...... 00 0)
co co co co coco
000000
O.....NMVonco......
................................................
00000000
......000)0
vvvon
0000
E
... (/)
cll _
u.. 1ij g> QI ~ C
QI ... QI- > 'E ~ uQlE
OJ U _ NO. cll QI co'" C
~ ~ ~ g ~g. ~~E 0 :;:: (/)g~ r
.9 Cl'~ i !: ..t ~ g .~ ~ ~ (/) Vi" .~ (/) ~ ~ ~ QI
U) c'" - 0 _ . _ :!j ~ ~! QI .~ (/) ti E 0 Cl ~ 0
.~ ~ ~ ~ ~ ~ ~ ~ .~ :> ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~
i ~ ~ ~ ~ ~~ ~oc:; ~i~-~ ~~~i~ ao~~ ~2
E ~ ~ c (f) ~oo ~.-o tJ'JE'-Co ~~!u~ Q)~E Q)~
_Ql>.a; ~ ~ ~.= 0606 _~~ ~ogQlES ~~~~aU a..zU) a::_,~ (/)
ra .= E t:" ~ ~ en fJ) C) ~ Q)"'" ... U fJ) Q) CO ..c: C 4) e:::: .2 in" en.... ..... fA VI Q)
.oQla. "o~ ~-QI cg> OClg> ~..2ClU U'.u..OQl ...C~ cll(/) 'C
<t EO... (/) QI e '': .- .- (/) . - ... .- U) (/) ... cll . - ~ ~ 0 (/) QI :;:: 0 .2 a. E 'C
- -'. _ _ 0 C (/) - (/) .... - QI _ - ...... U ... .0 ~ :: - - Cii cll
QI E QI C (/) ~ - C - C (/) QI QI ~ (/) .- w ~ "0 . - 0 a.. ::l U .- cll cll E . _ >. ~
(/)cll~ o~ ~E- (/)~O'E- CllQl~~~3 c~5~~ Cl!___...U ~>- (/)~
-...~ Ucll ~o6U... Uwcll o~wo::c cQI"'cU<tCll u"'- ... c~
Zo OJ 0 C > ... _ ,^ . _ 0 0: 0 ~ 'C Qj ~ :;:: cll c co:;:: ... .. 0 .. ~ u.. (/) ~ ~ !;n 0 (/)
0_ Ccll QI --cO ~~UCCl~ Cllu..OOU CllU~-(/)""'~(/)wcc2~QI~~
;n! ~ g .2 z ~ ] ~ .2 :^_ .~ _ ;n.!S ~ 'u .~... ~ :;:: c (/) E g ~ ~ =iij ~ cu.. 0 QlE C ~ (/) QI ..
U ~ ::l cll '5 .. 'w - _ w. ... -;-: QI U) 0'" C QI w U 0 .- :;:: ,. N ... U 0 .- (/) U QI U) o::l _ (/)
:;:: a.. ~ .!:! = (/) (/) Cl u.. '': cll ~ (/) QI U ~ . - QI ::l '5 ~ 2'- ~ (/) ~!!:!..'c ... .- .- Co ~ C E _ ... p .~
(/)_::lcotOJtcuOEUQI~-EU(/)U)E(/)Eo.QI-(/)-W -ClCl~...->'OQl::l"'a..-~
::lCllUClla..O O__=::OCllClE ...QI'CE~E (/)(/)oo_(/)(/)~COU_Cll~"'_O'C ~
O~~~ o.~o.~~'C_t'C QI::l'C_ ~ Ecct~(/)EE(/)~~::lU>QI~Cll__Ql~
U QI Cl U .= .= ~ .= c ... ::l ::l cll '': QI ~ ~ 0 0 0 'E 0 0 0 0 0 U 0 cll cll QI .- U 'C ~ ~ C c ii5 ~ .~ .: .!!!
<t<t<tQl<t<t::l<tCll~<t~~~UUUUUUQlUUUUU~uoooowwwwww...u..u..u..u..
~ u..:I: U W 0
.....NM
000
000
von
00
00
co
o
o
......OOO)O.....NMvonco......
000.,.....,.....,.....,.....,....,.....,...."1"""
00000000000
00 0) 0..... N
..........NNN
00000
Mvonca......OOO)O.....NM
NNNNNNNMMMM
00000000000
vonca......
MMMM
0000
;;-
co
6
:>
w
~
~
...
.
IlII
l!
l:I
i
!
III
...
c;;-
eo
6
:>
w
~
~
...
.
...
.
...
~
i
!
III
C
.~
t/l
CIl
Cl
g'~
:a e
>- ::~
Z :J 0
CIl alU
EECIl'tl
E :J ~ CIl
co .- 0 t/l
... ~ ..c: t/l
cn.....'-~
o CIl CIl-
o C ~ t/l
..c:~Oe
c..c..c..c..
C
01
t/l
CIl Cl~
>- Cl c-
.'!:: ad .~ ~
:0 t/l 01 t/l CIl t/l
CC - ~E
t/l 'iij 0'- U ~
t/l ~ ;~ C e ~~
>- U COCOt/lCll t/l- Ct/l
(ij u ~ii:CIlE ..:.::5 t/l w>-
_ ~ <( ~>-~CIl t/l Cuc E oc':IrJ)
~~~ ~ 'tl o~~~ ~ ~_~t/l~ t/l5
E'tlCll ~ ~ ~ E~CIlC CIl CIl~U~~ ~;
~:JE...- -Cl~ CIlUrJ)co E Cl9C1l~rJ) ~_co
o-t/l~~ ~Cco ~CIl~~ ..c:t/lCO-O~Cl CIl~E
- rJ) ~ t/l ~ 01 <(;.~ >- rJ) co CIl .... .!!! ... 0'" c:-... u CECIl ...
t/lCllUt/lc- C t/l_ -u--t/l U_CIl__c..-_Cl rJ)0
c>- co- ~ _cow>-y, -t/l>-c:J~-rJ)- -CC CIl ~
CIlEt/l...c.. CIl COUCCl>-~:JCOCllO"'COC >(ijCllo ~(ijc
_~Clo<(~oc':I CIl UCIlCOOCll~t/l>>_~....CIl'tl~_C_~ ~_
c~~c>->- C ~"'~~>:Jc>"'~ct/lUc cCl~C_<(C~
CIl-~ 0101>- - oO..._"'c..Ot/l:J"'oWCIl:JClCllCOt/lCll'" CIl..c:
E~..c:800Cl g't/l-o~Oal~oc':IU:JrJ)CIlU-"'OCllE~orJ)<(t/lE~
~~~W--~ClW'tl_~~U-_ClO'tl~-~co"'~CUc..CIlUOCCO
-uco.ggo~ c~..c:C;(ijUC'tlCllOCUU~~O~(ijo~~o'"
~~CIl~..c:..c:~c~~e~~co~CIl~~~~~~'tlCll~~u~E~CIl~~
0~t/lUUUX~-~UCIlt/l:JCIl~ON"'COt/lC::'tl'tl>CIl0 CO~>CIl
~~~~~~~~~:i:~:i:~~~~~~~ii:~~B5~~wa~~~~~
~~~~~O~NM~~~~~~O~NM~~~~~~O~~~~~~~O~NM
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
t/l
01 ~ ~ I ~ rJ)t/l t/l
C CIl t/lco C ~ ~~ & ~
C g, ~B t/l <( .!!!(;) ~~:g ~ ~ E t/l
~ ~ ~ iii ~ E C ~ ~ -g ~ al'L: ~ g- ~
-01 c: rJ) CIl ~ .~_ '(ij g :i: ~ III <( ~ 0 01 - ~ - _
C 0 c:~ U -u ~:O t/l'tl t/l E Ill~CIl~
- o..c: 'tl~? O~t/lcc C CIl ~CIlErJ) ..c: >- ~
~t/l~ t/l_uCl~ E cz ClllCll~1ll co ~ _t/l~Cl~Cl U... E
~~:a ~!e~~~rJ) ~~ OCll:a-Cl ~ oc':I ce~'tlOC Ig'~ 01
->-co -alCll:J-- -~ ;~:J~c CIl:J'tlC~~ t/l~'" g- C
c..(ij~ .a~ _CIlE:ag' e8 ~oc':I(;)~~ -g ~.l!l E::cco>:J CIlCll<( -C'L:
~ C 01 rJ) C t/l C E :J 'L: ~ t/l ~ _ - t/l CIl (ij co 'S; ~ C ~ ~ co C CIl U ~ 'tl - ~ .2 a:
... <( C t/l CIl 0 'tl '01 0 (;) CIl C._ I >- E U C C ~ _ ... 0 C 0 Cl CIl - 0 t/l CIl U C
~C~"'Cl~U~CU_CIl~~t/l CIl0111ClO ct/l CIlE~~~~-t/)rJ) >-~~~CIlCl:J~
O~cCIlc~_ W coc~E>- ~u~E~U!S(ij rJ):Jt/l>c~~E'tl _Cl~(ij~ClCllzc
" ... .. =: ; co (ij _ ~ U '01 ... _ CIl:J CIl 01 C .... C -;;:; OC ~ ~ 0 .__ .~ .. c: c: 0 - .- co E III c:
...., ... - CIl III -... - co t/) .- - w > '^ 'tl - Cl _ '- - .......... - - .. -0 co U U W 0
uCIlrJ)..c:CIl.!!!:J~UClClC&<(... -c:u_~CIlcE ~~__;::'tl~- - ~~~SUCO-;;:;.-:
-~CIlrJ)~co---'tl~WCIl_:JClClco-co"'ECIl'" t/l cococo~~>-t/) E~~____ -_
coC:-E(ij(ij~~~lffiS(ijrJ)~:~~Cl~~al5E~~~~EE~~~rJ)g' &CIl_Ec:-~CIl_~>
"'coo co~o~ co-...... ClClc "'c:",~>-c~~t/lt/l~ "'_-COc:CIlCllCO -CIlU~
~ ~ ~ .~ .~ Q...c::a . .~ E ~ ~ ~ .!: 'tl 'tl == 5 u 'OI'S; ':; ~ co 0 - :J :J CIl ~ -g 3l ~ ~ c: 'L: t .s .~ ~ :0 'tl .~ t/l
~::~C:C:~~:J~~~ooo~ee~U~C:C:~CIl~CIl~'tl'tl>COCOllllllCllCOCOCOCO::_OO:J~
<(~<(<(<(<(<(<(alUUUUUClClClClWWWWW~~~~~~~~~~~~~~~~~~~~~O
O~NM~~~~~~O~NM~~~~~~O~NM~~~~~~O~NM~~~~~~O~NM~
oooooooooO~~~~~~~~~~NNNNNNNNNNMMMMMMMMMM~~~~~
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
N
.
::
C,/
.Q
e
::l
Z
:::
.s:
.....
~
u
:a
.....
:::
C,/
'0
-
>,
u >,
::: :::
~~
<:::
..Q
M
~~
.0;
~~
~ ~
~Q
.:; ~
~ Qj
6:5 e
~ C,/
~ ~
I ~
Ci";:
,~
N
.
~
.....
,~
~
S ::l
:.. ~
~ (3
.c: U
u ~
:.c c
~ .....J.~
.5 ~ ~
~ ~.~
.~ a3 liJ
~ COc;
u CIl '-<
o 0) ~
~ ~ a3
~ >,0-
::: .....-
~ a ~
Z ::l-
..... C/) .S:
~ o~~ ~
.-' ::: >, ~
e :: .~ 2
c..~Uc...
.~
o
I
r--
o
I
r--
o
o
""-
~
~
.
~~
<~
~~l()
<~l()
~ 0 .......
00 ~ '- '411I
.....
u
~
.....
:::
o
U
o
..... If)
_ N
~N
o.N
:~ ~
,.,.,- ~,
- "n
'- M
o '-0
~ ~
.Q ~
= a
:;~
Z:u
~ 'C
.~
~o
Q,,:':l
C,/:'3
~ (5
E--C
~:
~Q
~o..:
.....
~- a)
~ v
~-I
S ,3
~ 5
Zu
~
1"1
'"
'"
ilJ
1-0
'0
'0
<
~
C,/
e
~
Z
,
<J~
<.0:':
'<"""tn
o
("')
("')
-I
LL
CIl
Q)
~
ro
-I
~ ,-. E
:.> ilJ ro
.;; 1-0
,~,-: E u 2
v. ...... = c -
~.~ ~ - ~
;jci:>ro>
~ 'J ~ ~>
cG''= ::: C Q)
-:::) 'J._ <l> U
- " 0 E .....
~Ji""cQ)
g2-oE
.~ c S ~ E
- .... C 0
~.~ E w 0
.~ -~ ~ ~ ~
'2!:5 ...c '<j"
<OM (f)'<"""
1"1
....
:::
ilJ
.....
-
....
:::
o
.;:
.....
:::
C,/
1-0
.C,/
;::
:.a
~
.:i
1-0
o
~
:=
;:
~
1-0
C,/
c..
o
.....
C,/
u
,-
,....
o
'-
o
'"
'"
C,/
1-0
'0
'0
<
..Q
1"1
:z
'--'
0)
:::
-~
-~
'S; 'r.
:=> 'r,
~ :~ ~
~ ':j
~ .H *
~> ~* j ,~
~ 'r. ~ :~
g ... .~
.~ ~ .~ .~ ~ -,~
2~~~3::
~, ~ ~_2 < g:'~ ~
_:20:r. 5
.....
(3
t)
0)
'0'
5,
CIl
-5
.....
(3
-0
0)
CIl
::l
0)
.D
8
1)
.....
;:::
(3
CIl
'-<
0)
0.
C
8
"'3
CIl
.....
(3
u
~ :1' <'"'I - ..0
rr. .r, ('J - N
--N-r-r--
::::5""'5' 5'~
_____f"#",
r-l N --
~<<<<<~<
'r, :;...-,
'r, .]
:":I :":I 'r,
":j C/:i 'r. ~J
J.~B'r.:::'~
"":J ;...., 'J ~
~2jJ];~
"
;,:
.;r
:,~.
B -
~ 3:
~~~~~.r,.r,~
- - - - - -~==~ .~ ~~
.g ,g .g .g.g --=,--,-
~:5:53~~,~1
-0
0)
CIl
o
0.
o
5,
'-<
0)
c
WJ
:; = :1' ~ ~ :: ~ ~
,..,-, ("'J
...,.
,-.
:::
.S:
~
c2
>-.
'-<
('.j
.....
.5
5,
>-.
.D
aJ
u
.....
(3
.b
:::
o
< < < < < < <' -<
__:2;-- -
::=_!.I - -: ,_g___
:.._:..=-~ ~
.~ .~ - - ;. ~-~ g
,...~ .- tl .~ ":j
~cclJ~2:r.E~
I I I I I I
'r, 'r. 'J':.
=0 V ::J ~ ~
22~2~
~~~~J~j~J
'r. or.
=j :;::i
2 2
'~IJ .~
_ WJ
- ':X) 'n 1"'1
~~~~I~=~~
:'l55'~5'555'
.....
(3
CIl
'-
0)
0.
<""'I "T r"1 "T ,.,-., ...
.....
u
a3co
~ '--'
CIl 0)
:J .5
'--' -
<<<<<<$$
~
~ ~
~ .r. 'B ~
.2 __2 "J g :~
.~_:J ~,.... .-
'/l--....._~E~SU
g,. ~ ~ ~ :i
- C .2_. 5 .2 ~ :5
~ 'r. t ~ 'r.
~ .r. ~ ~ ~ ~ .~
<]5533]
~v.::"""vvv_
.....
ilJ (3
:::-
.- 0)
Q" en
.~ := 'J
;;; o~
.- ~ -
Q 0) ~
>, o.-e:
.Q ~
Oj5~~~~~~=?2
=...=:;;;-
::: I ~ :'l
~.S -
1-0-0
ilJ '"'
c.. a
5'5'
~:'l5'5'
__1""1__N_N
..,;. ~~~~~~~~
'0
:::
~
2 -;
~ u
- .S
~ .c:
~ u
C,/
.....
~
.::
.....
~
1-0
g .'5
~ =
_ .s
'0
~
OJ)
:::
~ :.a
::l
]
'-'
<
,...
n
-n
>,
::
:.0
.-
'"
:::
o
Q"
'"
ilJ
1-0
'-
o
'"
~
ilJ
1-0
~
~IJ or.
.~ 'r.
;,:
.~ ~
:J-7
u
,-
-
.(j
C,/
0.
'"
C,/
:::
.- ,-.
- C,/
..... u
:I ,_
0::
'0 0
::: OJ)
... :::
rI) .~
... ::l
E u
,- 0
- 1-0
OJ) Q"
::: -
.- -
..... .....
~ .~
0.:::
.~ ~
.- -
t!+:
~ =
Q"O
..... .....
== g
~ .:!l
c.:::"1"
~I/)
E-o~
z"tj
~ ~
>t::
~<
~ e
Q~
>,.c:
.Q ~
.~ aJ
1-0
'3~
.-=: -;
8 .~
.Q :::
::l ~
'" :::
:::lo:
vi
N
~
~
~
:>
w
~
w
"
<(
Q.
III
III
N
:2:
0::
o
u..
C
0::
<(
C
Z
<(
I-
en
o
:::
D
'"
ilJ
....
D
....
"1-0
C,/
.c:
.....
~
o
.....
'0
C,/
~
1-0
o
~
>:
~
::l
o
->
ilJ
1-0
c..
ilJ
1-0
::l
.....
....
Q::i
>
.....
:::
'0
...,
'"
:.=
.....
'"
~
...
-
eo:
I/)
r--
.
_-.......r-.
I
.
,
I
I
~
00::
"'n.
i!!<(
~.c
z-31
'2 u
::l '"
E c
E :5
80
Q; I
~ '" u .
III - co ~ ~ , ; ~
c0 c
8.a:~ co N ';:I ~ cU
o~ _2 , l'J '0,.8 ~
~~~ u r:! ~
-g~~ Utfi:9~
.~ (J) ]i ti(1)t5.~
'5:eC I ~.S ...J I '5- ~ 5 ~
o ::l co o E C
~():2 ~~~ D:~I-~
W 15 C I o C
u: 0 en co
u I (9
,
w w w ~ W
Ii Ii Ii '" Ii
cfi ~ 6 'c
E :.J ~ :c
~ '" -~ -5
.!::! C Q) m
<( -:fi n.
U).cE-g
~ ~ :=; a::
ui
Ii
-ri
1! co
C ~
U5 IJJ
co
'c ~
co 0
0:: 0
ui ui ~ ui 0
~~E~~cL
~8~i~
:E~.cc:~
E Q) C 0 C
~ "2 <3 -g ~
3: ~ ~ ~ ~
ui
Ii V>
::i Q5
~ ~
!an.
~a>
~~
~~
<.)
Ii:
::;;
ui~
n. () _t;
g~ ~ 5
En.<(-g
~ g .~ .9
o E ~ C
~E~~
~ ~ J ill
W ~
co
-,
uiw
Ii Ii
en >.
;: '"
~ ~
C 0
<( ()
>- '"
'" :::
<.) '"
co C
U5 ~
..;
<<'
. :3
0.
E
co
()
0
Ol
ui ui '"
Ii Ii (;
::i ci
co J:'
:c n.
en
[? c:
:rg ;:
-iU
() ~
c"
C [?
0 0
-, en ui
ui
Ii Ii w '"
Ii C
on to "fii
N 0
I ~ ~ 'S~ '"
c:
:i! 8.- -g.
I V> ,gjl
W w
E <.) '"
" ~ 0l0::
~ " -in (; ()
" I it: :l V> C '" 0
0> o co ., C '" .c; (9
'" z -"l
C -~ :n ui ui ui ui
'" o C Ii ui
::;: ., '" CO Ii Ii Ii
'o'~ ",'0 on ui Ii
::;: Q; c: E
.~ ~W me: 0 -'" Ii J:' 'iii
Q.'t:: V> C
iU u '" o(l C '0 '" .,i g E [?
::l o~ J:~ -:; -e -c: >- 0
0 -"l '" iU u: ...J <ij >-
<( 0 LL. >- n. 0;
0 a; c: .c; E
;: .c; 0 <n
1! '" 0 ~
-, E '"
~ >
<.) i= ~ >.
~ <( en
ui
Ii
oj
C
-iU
0::
'"
<.)
:J
W
ui ui
ui Ii ui
ui w Ii
. Ii Ii Ii cO Ii
0 Qi
Qi Qi Qi -c: c:
0 0 Vi
E > [? ::;; <n .c;
'" '" Ui '" C -ijj
:<: 0 ...J ~ (9
0
<.) i6' 1:- C -, V>
~ (; ro '" <.) '"
.c; E
en 0. ~
'" ~
iii
.
.
.
Jordanna Rubin
Professional Qualifications
Jordanna Rubin has worked in the Environmental Management field for over 8 years. Mrs. Rubin has a
Masters in Public Administration, with a concentration in Environmental and Energy Policy, and a
certificate in Conservation Biology from Columbia University in New York City. Mrs. Rubin began her
career working for the NASA Goddard Institute for Space Studies analyzing wetland inventories for the
Ramsar Convention. Prior to returning to her home town in Miami, she became the Assistant Director of
the Energy Policy Research Center at Columbia University, managing both the academic program and
research initiatives.
Most recently, Mrs. Rubin was the Environmental Resources Manager for the Environmental Division at
the City of Miami Beach. She was responsible for the management of all environmental projects and
regulations within the City and served as a liaison to local and state environmental regulatory agencies. [n
addition, she launched the development of several sustainable initiatives including a Green Business
Network, a "Green Map", and an Environmental Sustainability Committee. Other sustainable program
management areas included alternative transportation policies, green purchasing guidelines, energy and
water conservation programs, and the initiation of green building standards for the City's building code.
Mrs. Rubin was also the project manager for the design, engineering, and construction of over l5 Public
Works construction projects; including shoreline restoration and protection and alternative transportation
projects.
Mrs. Rubin currently serves as Co-Chair of the Local Government Committee of the Florida Green
Building Coalition. [n addition, she is a member of the South Florida Chapter of the US Green Building
Council, the Association of Environmental Professionals, and the Florida Shore and Beach Preservation
Association.
Education
Certificate Program, Conservation Biology, Columbia University, New York, New York, 2002
Master of Public Administration, Environment and Energy, Columbia University, New York, New York,
2000
BA, Ancient Studies & Environmental Science, Columbia University, New York, New York, 1998
Additional Training
Beach Technology and Coastal Zone Management, Ft Lauderdale, 2007
LEED New Construction v2.2, Miami, 2006
Sediment & Erosion Control, Miami, 2006
Microsoft Projects, Miami Beach, 2006
Financing US Power Projects, New York, 2002
Energy Industry Fundamentals, United Kingdom, 200 I
Global Oil & Gas: Energy Connections, New York, 2001
Maritime Law, New York, 2001
Experience and Background
04/2006 - Presellf
Project Manager, Shaw Environmental, fnc., Miami Lakes, FL
· Sustainability Services
· Enviromnental Compliance and Due Diligence
soil testing and disposal, a pre-existing tvIBTA police
station which must stay operational, and a very small site
which restricts vehicle movement, and numerous utility
corridors and conflicts.
Mass Port Authority, Massachusetts Bay
Transportation Authority, MHD, Woburn Regional
Transportation Center, Woburn, MA. Managed civil
design team responsible for preparing final rail plans,
profiles, cross sections, traffic control plans, platform
geometry, drainage and erosion control plans,
construction staging plans, civil specifications and cost
estimate. Coordinated track design with a new 2000-car
parking lot, two pedestrian bridges, and new commuter
station. Specific design issues included determining
proper rail alignment (to switches), spiral curves through
platform, rock excavation adjacent to existing
warehouses, and contaminated soil testing and disposal.
The accelerated design schedule called for four design
reviews and the PS&E submittal in a to-month period.
Provided support and RFI responses during the 18-
month construction phase. Project was successfully
completed in Summer 2000.
Texas Utilities/TxDOT, Interstate 45 at CR 1080
,
FM 80, FM 488, FM 2547, FM 246. Managed civil
design team responsible for preparing final highway
plans, profiles, cross sections, traffic control plans,
drainage and erosion control plans for several at-grade
and grade separated interchanges. Responsibilities
included determining proper highway alignmcnt(s) due
to constmction of a proposed rail line, while maintaining
adequate vertical clearances below existing stmctures
and minimizing impacts to adjacent property owners.
The accelerated design schedule called for all five
projects (460 drawings) to be completed and ready for
bid in a 5-month period.
VTrans, Bridge Project - US Route 5 over 1-91,
Hartland, VT. Prepared the roadway plans, profile,
cross sections, highway specifications and cost estimate
for this bridge replacement project. The traffic control
plans required longitudinal demolition of one side of the
existing bridge. A temporary traffic signal was specified
to provide a one-lane, 2-way traffic operation over the
bridge. Also, a tmck detour plan was implemented since
no tmck traffic was permitted on the bridge for a 72-hr
period after the deck concrete pour. The project was
completed in 2003.
Miami International Airport Dade County Aviation
Department, Traffic Circulation Study Miami
Airport. Prepared the traffic circulation study, which
developed the 2005 vehicle trip projections, and
analyzed intersection operations and levels of service
(LOS) for five (5) roadway circulation alternatives for
the expansion of the Miami International Airport.
Connecticut Department of Transportation, East
Cut Drainage Project, New Haven, CT (Contract
301-0031). Prepared final drainage plans, special
provisions, and cost estimates for the installation of a
ne\v 5000-ft storm drain system, grit chamber, two flex
valves, and pump station modifications within the New
Haven rail yard. Major design and construction
coordination was required with Metro North and
A~ITRAK. Represented CDOT at claims hearing to
reduce the amounts awarded to Contractor regarding
delays in construction schedule and dewatering
implementation.
Massachusetts Highway Department, Route 2A
Bridge over 1-95 (Rte 128) Lexington, MA. Prepared
plans, specifications and cost estimates for the Route 2A
approach roadwork and drainage, and developed the
maintenance of traffic and construction sequence plans
for the bridge replacement. The new bridge was
constmcted approx. 3-feet higher than the existing
bridge. The TCP required 6 individual phases in order
to maintain 2 lanes of moving traffic on Route 2A. A
detour plan showing total closure of 1-95 (night) was
required to allow multiple cranes to swing into place the
new bridge beams. Design work was completed in 2006.
Massachusetts Highway Department, Route 122
Bridge over Millers River, Orange, MA. Prepared
final plans, specifications and cost estimates for the
Route 122 approach roadwork, and developed the
maintenance of traffic and construction sequence 'plans
for the bridge replacement. The bridge TCP required 6
individual phases in order to maintain 2 lanes of moving
traffic.
Iroquois Pipeline Operating Company, Eastchester
and Bronx, NY. Prepared conceptual design services
related to the new 26-mile gas pipeline, which will
SHAW ENVIRONMENTAL, INC.
2
06\;122006T
JAMES A. BARRACK JR.
hand auger and direct-push technology, soil screening
with OVA-FID, groundwater sampling, soil conductivity
investigations correlated with cliscrete soil sampling, and
generation of contamination assessment reports.
Project Geologist - Numerous FDOT District 2
Underground Storage Tank Removal (UST) and
Closures. Efforts included contaminated soil
delineation, air monitoring, soil and groundwater
sampling, assisting in transport and disposal, and
generation of UST closure reports.
Project Geologist - FDOT 2, Fuller Warren Bridge,
Jacksonville, FL. Location, removal, and disposal of
creosote wood pilings. Efforts included location and
exploration for pilings, contaminated soil delineation, air
monitoring, and assistance in transport and disposal.
09/2000 - 02/2001
Project Geologist - FDOT Proposed Retention
Ponds, St. Johns County, FL. Phase II investigation
that focused on potential arsenic soil contamination,
Efforts included soil borings using hand auger and
Geoprobe@, detailed lithologic descriptions, and
generation of contamination assessment report.
Project Geologist - Former Storage Tek, Palm Bay,
FL. Extensive groundwater sampling event. Included
sampling of over 45 monitoring wells using micropurge
technique, use of YSI multiprobe to collect groundwater
parameters, and collection of groundwater elevations,
Project Hydrologist - Sarasota Maintenance Yard,
Sarasota, FL. Efforts included aquifer testing using
standard and pneumatic slug tests, groundwater
sampling with peristaltic pump, and soil boring
installation with Geoprobe@.
Project Hydrologist - Former Moore Haven Road
Prison, Moore Haven, FL. Tank removal and closure
and soil remediation using potassium permanganate.
Efforts included contaminated soil delineation, soil and
groundwater contamination sampling, and AST
transport and disposal.
03/2000 - 07/2000, Junior Petrologist,
Mevatec Corporation, White Sands
Missile Range, NM
Responsibilities included providing detailed lithologic
descriptions of well-cuttings from groundwater and
petroleum exploration wells installed in the Tularosa
Basin of New Mexico. All lithologic descriptions were
summarized into tables and reports for an ongoing,
basinwide study of hydrogeology.
Assisted biologists with herpetologic (reptile) survey of
White Sands tvlissile Range that included live capture of
venomous reptiles and nocturnal activity surveys.
SHAW ENVIRONMENTAL, INC.
2
06C 122006T
BRENDON D.J. BAILEY, PG.
Swamp, Burning Grounds/Exposed TNT Area, and Old
Yellow Water Reservoir Area (2004); Site-Specific
Sampling and Analysis Plan for Site Investigative
Activities at the Electric Meter House and Main Switch
House, Concrete Pit, and Sanitary Sewer System (2003);
and Site-Specific Sampling and Analysis Plan for
Supplementary Investigative Activities for the Collection
and Analysis of Treatabiliry Study Data (2003), ESI-9
Groundwater Review Package (2000); Site-Specific
Sampling and Analysis Plan for the Supplementary Soil
Sampling at the South Acids Area, Toluene Storage
Areas, and Cooling Tower Area (OU-10) (2000); Data
Summary Report for the Supplementary Soil Sampling at
the South Acids Area, Toluene Storage Areas, and
Cooling Tower Area (OU-IO) (2001); Technical
Memorandum, ESI-9/0utgoing Classification Yard,
Supplemental Analytical Data Summary (2001);
Evaluation of Filtration on Nitroaromatic
Concentrations in Groundwater (2002); Site-Specific
Sampling and Analysis Plan Supplementary Investigative
Activities at the Motor Pool/Maintenance Area (ESI-6),
South Acids Area, Toluene Storage Areas and Cooling
Tower Area (OU-lO), and TNT Manufacturing Area
(OU-8/0U-9) (2002); and Site-wide Background Study
(2002). Conducted and/ or oversaw field efforts related
to most of these reports or work plans, including low-
flow (minimal drawdown) groundwater sampling, three
volume purge groundwater sampling, surface water and
sediment sampling, soil sampling with direct-push
technology rig, and groundwater level measurements.
Responsible for preparing the work plans and
investigation reports and overseeing the field effort for
each of the below-mentioned long-term monitoring
groundwater sampling events. Long-Term Monitoring
Reports prepared for \'<1V0\'V' and the dates they were
finalized include: Eleventh Annual OU-1 Investigation
and Ninth Annual OU-2 and OU-3 Investigation (2005);
Tenth Annual OU-1 Investigation and Eighth Annual
OU-2 and OU-3 Investigation (2004); Ninth Annual
OU-1 Investigation, Seventh Annual OU-2 and OU-3
Investigation and Fifth Annual OU-11 Investigation
(2004), and Eighth .Annual OU-1 Investigation and Sixth
Annual OU-2 and OU-3 Investigation and Fourth
Annual OU-11 Investigation (2003).
Prepared the Seventh Annual OU-1 Investigation and
Fifth Annual OU-2 and OU-3 Investigation and Third
Annual OU-11 Investigation Long-Term ~Ionitoring
Report for groundwater sampling at \'(,'VO\V
08/1998 - 10/2000, Environmental
Scientist, HydroGeologic, Inc., Austin, TX
Conducted and oversaw field activities at Naval Air
Station (NAS) Fort Worth Joint Reserve Base aRB)
(Carswell Field) in Fort Worth, Texas. Field tasks
included groundwater sampling, soil sampling, well
development, weekly product removal, well
maintenance, well gauging, and IDW disposal.
Performed well installation and soil sampling with both
direct push technology (DPT) and hollow stem auger
drilling methods. Field work included quarterly
groundwater sampling, landfill investigations, and TCE
plume delineation with both dedicated and non-
dedicated bladder pumps. Office supports activities
included data validation, tabulation of data, entering
borelog data in \Vinlog, and report preparation. Rep?rts
prepared included Southern Plume Delineation Report
and a quarterly groundwater sampling Report.
t\[s. Anglin supported a potentially responsible party
(PRP) investigation for the Estes Landfill in Phoenix,
Arizona. As part of this investigation, she reviewed
corporate and financial records from Dun and
Bradstreet and Hoovers Online to determine the
corporate history and current financial status for
approximately 40 large companies, gathered and
reviewed records obtained from local agencies, and
interfaced with clients.
In addition, Ms. Anglin supported the modeling group in
the Austin office by editing reports, preparing figures
using TECPLOT, AutoCAD, and Corel DRAW for
Kelly Air Force Base in San Antonio, Texas and
SSCOM.
SHAW ENVIRONMENTAL, INC.
CATHERINE W. ANGLIN 2
06C122006T
Jordanna Rubin
Page 4
Jordanna Rubin, Green Initiatives in Miami Beach and the Florida Green Building Council, FDEP
Workshop: Green Lodging Program, Miami, FL, 2006
Jordanna Rubin, Christy Brush, Dune Protection along an Urban Beach, Florida Beach And Shore
Preservation Association Annual Conference, Key Largo, FL, 2005
Jordanna Rubin, The Geopolitics of Hydro politics, Presentation to Greenberg Traurig: JNF lunch lecture
series, Miami, FL, 2004
Jordanna Rubin
Page 2
11/2003 - 03/2006
Environmental Manager, City of Miami Beach, Public Works, Environmental Division, Miami Beach,
FL
· Project Manager for over 15 Public Works construction projects including: the Beachwalk
(beachfront recreational corridor), golf course remediation and monitoring, South Point Pier
Restoration, Pine Tree Park Shoreline Enhancement and Kayak Launch, Collins Canal Seawall
Enhancement and Bike Path. Responsible for management of permit applications, design
development, bid and contract negotiations, and construction management.
· Managed architectural and engineering consultants in the design and environmental permitting of lO
coastal and waterfront projects including 1.2 mile North Beach Recreational Corridor, and Biscayne
Bay Seawall & Street End Improvements.
· Represented City as a permittee on numerous projects that required environmental resource and
coastal construction permits from Florida DEP, South Florida Water Management District, Miami-
Dade DERM and U.S. Army Corps of Engineers.
· Served as liaison for the City with Miami-Dade County and the US ACE on all beach renourishment
and management activities, including securing federal funding, renourishment, and innovative
technology projects.
· Wrote a best construction practices manual to help contractors minimize impacts to the City's
environment.
· Developed a total quality management "dashboard" to improve process efficiency and project
management for four divisions of the Public Works Department.
· Improved compliance with the Federal NPDES permit, including preparation of the required annual
report, development of a new Stormwater maintenance program for Public Works Operations
Division, and created a stenciling program for all catch basins within the city.
Initiated a Green Business Network program to assist local hotels, restaurants and other business to
reduce energy and water consumption. Members are promoted using a web based GIS map.
· Composed and successfully managed the legislative process for the adoption of a Sea Turtle
Protection Ordinance which minimized artificial coastal lighting.
· Created and produced two Earth Day Expos where over 60 businesses and 2,000 attendees
participated.
· Member of the Engineering Review Team for all city capital improvement projects to ensure
compliance with federal, state, and county environmental regulations. Worked with regulatory
agencies to expedite permits.
· Developed a GIS map used by the emergency response team for hurricane rapid impact assessments.
07/2000 -09/2003
Assistant Director, Energy Policy Center, Columbia University, New York, NY
· Consulted on the permitting for a renewable tidal energy project for Roosevelt Island, NY.
· Managed the Center's external relations with media, government officials, industry organizations, and
academic and non-profit organizations. Organizations include: ExxonMobil, Onassis Foundation,
Mitsubishi Corporation, US DOE, & EPA.
· Led the Center's outreach and promotional activities, including the following: secured guest lecturers,
career development programs, production of brochures, semi-annual newsletters, the Center's
website, and other occasional publications.
· Developed material for the Center's academic program, executive training programs, and research
initiatives.
.
.
.
Jordanna Rubin
Page 3
. Administered the daily financial transactions for the Center and reconciled an annual budget of
$600,000.
. Served as Rapporteur to the Center's Advisory Council and officer for the Delaware Charitable
Foundation.
. Liaison for energy and maritime industry executives; former CEO of Mobil Corp., CEO of Poten &
Partners.
. Advanced a business and financial strategy for the development of the Center.
. Managed direct investments and coordinated annual meetings that set policy for the activities of the
Center.
12/1999 - 08/2000
Research Assistant, NASA Goddard Institutefor Space Studies, New York, NY
. Provided essential research used in a publication detailing the variations in Remote Satellite Imagery
when used for wetland inventories identified by the Ramsar Convention, an International
EnvirolUnental Treaty.
. Assessed wetland inventories using satellite imagery to determine any threats or changes to the
wetland enviromnents.
· Developed an informational website describing the use of Remote Sensing and GIS systems for
wetland delineation and inventory.
· Created a website-based forum for the exchange of ideas between the members of the Ramsar
Convention.
06/1996 - 09/1997
Environmellfal Engineer (Summer Intern), City (~lNorth i\iliami Beach, Public Services, North i\iliami
Beach, FL
· Project coordinator for the creation of a monitoring system used to detect wellfield contamination.
· Responsible for writing the City's annual Conservation Plan and produced a prototype for water
conservation programs.
· Revised the City's drainage atlas and developed a new method of cataloging and maintaining the
drainage system.
· Managed implementation of drainage system in accordance with the NPDES permit.
Professional Affiliations
US Green Building Council, 2006
National Association of Environmental Professionals, 2005
Florida Beach & Shore Preservation Association, 2005
American Beach & Shore Preservation Association, 2005
Florida Green Building Council, Co-Chair; Local Government Committee, 2004
A wards/Honors
Certificate of Appreciation, Mayor & Commission of the City of Miami Beach, 2005
Dean's Scholar Award, Columbia University, SIPA, 2000
Four Year Athlete Award in Women's Intercollegiate Fencing, Columbia University, 1998
Distinguished Leadership Award, Barnard College, Columbia University, 1998
Publications/Presentations
Jordanna Rubin, "Wrapping up the Green", FDEP Workshop: Build Green, Save Green, Boca Raton, FL,
2007
Catherine W. Anglin
.
Education
B.S., Earth and Atmospheric Sciences, Georgia Institute
of Technology (Georgia Tech), 199G
Background Summary
.
~[s. Anglin is an Environmental Scientist with over 10
years of experience in site investigations and report
writing in the realm of em'ironmental consulting. ~fs.
Anglin provides technical oversight, coordination, and
task management. She has performed and overseen
several subsurface investigations and site investigation
projects in Texas, \Vest Virginia, Florida, and Puerto
Rico. Ms. Anglin has completed projects at sites with
nitroaromatics (explosi,'es), trichloroethene (fCE),
metals, and fuel-related contamination. She has field
experience related to soil, sediment, surface water, and
groundwater sampling. Soil sampling experience has
been with both direct-push technology and hollow-stem
auger drilling rigs. Groundwater sampling experience
has been with low-flow (minimal dra,vdown) sampling
and three w)lume purge techniclues with bladder,
perstaltic, and Grundfos pumps. i\1s. l\nglin writes and
prepares site investigation reports, including long-term
monitoring reports, reports of findings, work plans, data
package reports, feasibility studies, and site-wide
background studies. i\[s. ,\nglin has experience in
preparing Potentiall!' Responsible Party (PRP) searches
for the U.S. Environmental Protection i\gency.
Throughout i\.1s. Anglin's career, her organization and
site knowledge ha,'e enabled her to solve the
em'ironmental challenges she has faced with her
projects, closing them ahead of schedule and under
budget.
i\[s. Anglin also served as Construction Quality Control
Site i\.1anager for a large levee repair project in southern
Louisiana following Hurricane Katrina.
.
Relevant Experience
02/2006 - 08/2006, Construction Quality
Control Manager, Shaw Environmental &
Infrastructure, Inc.
;\s a special assignment in response to Hurricane
Katrina, Ms. Anglin assumed the role of CQC Manager
for an S 18 million levee repair project in southern
Louisiana. This project ilwolved emergency repairs to
4.85 miles of hurricane protection le,'ee along the west
bank of the ~[ississippi Ri,'er. The scope included
borrow pit development; excavation, processing,
loading, hauling, and placing nearly 1,000,000 CY 0 f
borrow material; placement of riprap; geotextile fabric
placement; surfacing stone; and Hydroseeding. Her
responsibilities included soil classification, moisture
testing, review of material documentation, and daily
reporting. As this was a US Army Corps of Engineers
(USACE) project, i\1s. Anglin implemented the USACE
three phases of Quality Control by preparing and
executing the Preparatory, Initial, and Follow-up Phases
prescribed by the USACE.
10/2000 - Present, Environmental
Scientist, Shaw Environmental &
Infrastructure, Inc.
Responsibilities include task management, report writing
and preparation, and conducting and m'erseeing field
investigations. Primary assignment is \'('est Virginia
Ordnance \,\'orks (\'\VO\\') in Point Pleasant, West
Virginia. Recent assignments have also included Former
Lee Field Na\'al ,\ir Station in Creen Cm'e Springs,
Florida and Former Ramey Air Force Base in Aquadilla,
Puerto Rico. l\lso performed field \vork (slug testing
and groundwater sampling) and report preparation for
Plum Brook Ordnance \,\'orks in Sandusky, Ohio.
Field acti,'ities range from landfill im'estigations, fuel
pipeline im'estigations, se,ver line investigations, and
former TNT manufacturing area investigations. Field
tasks include groundwater sampling using bladder,
Grunfos, and perstaltic pumps; soil sampling using
direct-push technology (OPT) and hollow-stem auger
drilling methods; sediment and surface water sampling;
soil gas survey using GORE-sorbers(R); and
groundwater level measurements.
Reports prepared include: Feasibility Study for the
Southeast Area (2005); Report of Findings for the
Southeast Area Supplementary Investigation (2005); Site
Investigation Report for the Electric i\Ieter House, Main
Switch House, Concrete Pit, and Sanitary Sewer System
(2004); Site-Specific Sampling and Analysis Plan for
Supplementary Investigative Activities at the Main
Trunk Sewer Line, TNT Manufacturing Area, Southern
SHAW ENVIRONMENTAL, INC.
CATHERINE W ANGLIN
06C122006T
Brendon D.J. Bailey, P.G.
.
Education
~LIL-\., Business Administration, University of Florida,
Gaines\'ille, FL; 2005
~I.S., Geology, New ~Iexico State University, Las
Cruces, NM; 2000
B.S., Natural Resources (with Honors), University of the
South, Sewanee, TN; 1997
Registrations
Professional Geologist, FL
Background Summary
.
l\[r. Bailey, a licensed professional geologist in the State
of Florida, is currently Sha\v's Florida Department of
Transportation (FOOT) Program Director. He also
selTes as the Office Director for the Gaines\'ille, Florida
office. His expcrience includes transportation planning
(PD&E) studies, National Em-ironmental Policy Act
(N EP A) compliance, em'ironmental site assessments,
soil and groundwater sampling, contamination
delineation, and coordination of contaminated material
transport and disposal. His skills include project
management, client relations, monitor well construction
and installation, storm\vater-erosion-scdimcntation
control inspection and reporting, detailed research and
tcchnical rcport writing. [n addition, l\lr. Bailey has a
strong geological background with special emphasis on
sedimentology, stratigraphy, and geographic information
systems (GIS). His geological cxpcrtise is furthcr
complcmentcd by a busincss administrative background,
ha\'ing recently completed his MB1-\ at the Uni\'ersity of
Florida.
.
Relevant Experience
06/2006 - Present, Florida Department of
Transportation (FOOT) Program Director,
Shaw Environmental & Infrastructure,
Inc., Gainesville, FL
Primary responsibilities involve the management and
development of Shaw's Transportation Program with a
particular focus on our FOOT program. His focus
includes business development and strategy, marketing,
contract management, and expansion of core
SHAW ENVIRONMENTAL, INC_
06C122006T
competencies. l\.[r. Bailey has retained project
managcment of critical FOOT projects while dedicating
significant efforts to strengthen Shaw's position as a
transportation firm. He has expanded our G [S and data
management services within Shaw's Florida
Transportation group. Ha\'ing recently opened a satellite
office in Gainesville, Florida, l\.Ir. Bailey also serves as
thc 0 ffice Director.
Key efforts included:
. Providing FDEP, NPDES, and water management
permitting and compliance serviccs to roadway
construction contractors and FOOT.
. Conducts construction plan rc\'iew for FOOT for
identification and mitigation of etwironmental issues
in accordance with NEPI\ guidelines and Part 2,
Chapter 22 of FOOT's PD&E l\[anual.
. De\'eloped electronic databasc for project tracking
within FOOT, Distict 2, to ensure all projects
received adctluate contamination scrccning in atkance
of construction.
. Coordinated effort betwcen FDEP, Uni\Trsity of
Florida GeoPlan, and FOOT to create G IS database
of Offsite Contamination Notifications.
. Coordinated remediation effort to treat soh-Cllt-
contaminated groundwatcr at a FOOT/City of
Jacksom-ille road construction projcct. lncludcd
extensive negotiations with client and FOEI' to
approvc clean efflucnt dischargc to intiltration pond.
02/2000 - 06/2006, Project
Geologist/Project Manager, Shaw
Environmental & Infrastructure, Inc.,
Clermont, FL
Rcsponsibilities include designing coordinating, and
conducting Level 1 and Le\'el 2 sitc/ corridor
cnvironmcntal assessments for both pri\-ate and public
clicnts; providing "in-house" clicnt support of Florida
Department of Transportation District 2 (FDOT-2)
environmental services contract; development of cost
estimate and work scopes for client approval;
implementing GPS/GIS and Microsoft Sharepoint
technologies into existing contracts; and emergency
response support for hazardous material encountered
during cons truction.
Project Geologist - Numerous FDOT Phase II
Environmental Site Assessments. Efforts include
monitor well installation, subsurface soil sampling with
BRENDON D_J_ BAILEY, P.G.
James A. Barrack Jr.
.
Why Selected as Key Personnel for Contract
. 26 years of experience in the preparation of
site plans on infrastructure projects including
tunnels and maintenance facility layouts and
designs
. Experienced manager of design teams on large
infrastructure projects
Education
B.S., Ci,"il Engineering, Uni,'ersity of r,[aryland at
College Park
1\I.S., Ci,'il Engincering (fransportation), Uni,"ersity of
1\[aryland at Collcge Park
t\Ianagement Seminar, \'\'orcester Polytechnic Institute
Boston University, certified financial planning courses
Registrations
Professional Engineer: t\L-\, r,[D, GA, VT
.
Background Summary
i\[r. Barrack has 26 ycars of expcrience in the
transportation industry. Currentl!", as a Senior Lead
Engineer, he is responsible for the preparation of site
plans, highway plans/profiles, traffic impact studies,
traffic safety studies, parking studies, traffic signal plans,
traffic control plans, tunnel plans, profilc and station
studies; maintenance facility layouts and designs,
technical specifications, construction cost estimates, and
project schedules.
1\[r. Barrack is also involved in the preparation of cost
and technical proposals for military family housing
projects, footprint bridgc projects, and traffic-relatcd
proposals.
.
Prior to joining Shaw E + I, t\[r. Barrack was the Unit
Manager of traffic operations at HMt\[ Associates, Inc.
where he was responsible for the technical preparation
and budget administration of traffic projects for the
public and private sector. Prior to joining HMM, Mr.
Barrack was a Civil Engineer at Greenhorne and
O'l\Iara, Inc. in Greenbelt, t\ID, where he was
responsible for preparing traffic studies, civil highway
plans, specifications, and cost estimates.
Relevant Experience
1991 - Present, Senior Lead Engineer,
Shaw Environmental & Infrastructure, Inc.
FEMA - IA T AC, Bring New Orleans Back, LA.
Project engineer responsible for inspections of City-
owned buildings and compilation of existing
data/reports and preparation of cluantity estimates for
necessary repair work. The inspections included over
100 city-owned buildings, and invoked
repairs/replacement of the roof system, windows,
skylights, walls, and missing or damaged roof mounted
ec!ulpment.
Experience includes:
Hanscom Family Housing (client -American Eagle
Design Build Studio). Project t\Ianager responsible
for the civil and utility designs for demolition of 850
housing units and construction of 784 housing units and
5 neighborhood centcrs. The project included design of
8 miles of ncw roachvays, parking arcas, 350 drainage
structures, 8 detention areas and 7 undcrground
infiltration gallerics, firc protection, water distribution
and a sanitary collection system, natural gas, electrical
and communication systems. Our design team also
prepared the documents required to process the State
and local environmental permits. Thc dcsign fce is
confidential (internal client). Site design and
environmental permitting was completed in April 2006.
Construction is planned for mid 2006 through 2010.
Civil and Transportation Projects Division (Feb
1991 to Present). As Senior Lead Engineer, responsible
for the preparation of the following design projects,
studies and task assignments.
Massachusetts Bay Transportation Authority,
Southampton Street Maintenance Facility
(Contracts E02CN21 and E02CN22). Lead civil
engineer responsible for the preparation of final plans,
specifications, quantity and cost estimates for the new
Silver Linc Bus 1\Iaintenance Facility. The new facility
will house and maintain 77 sixty-foot articulated buses.
The contract required relocation of Moore Street, design
of a 250-car parking garage, maintenance building,
fueling building, wash and degrease building, and a
transportation building. Numerous design issues
included a contaminated site which required extensive
SHAW ENVIRONMENTAL, INC.
JAMES A. BARRACK JR.
06C122006T
.
connect Long Island to the Bronx borough. Reviewed
directional drilling and cut/ cm"er plans and profiles, and
prepared TCP's for several alignment alternatives. The
project constnlction was completed in 20tH.
US Army Program Manager for Chemical
Demilitarization, Aberdeen Proving Ground,
Aberdeen MD. Prepared the conceptual alignment
study for transport of the VX and mustard gas filtered
effluent from the bio-treatment area to the water
treatment plant. Five transport options; tnlcking, buried
force main, abm"e grade force main, directional drilling,
and force main to gravity, were studied and constnlction
cost estimates were provided. The final construction
was completed in 2006.
.
HMM Associates, Inc. Concord, Massachusetts -
1988 to 1991. As Unit !\Ianager, provided overall
direction to junior engineers and technicians which
included collection of traffic data using Automatic
Traffic Recorders, calculation of trip generation, gravity
model distribution, intersection LOS using the latest
Higll\vay Capacity !\Ianual Software (HCS and CINCH),
and preparation of reports. Prepared traffic signal
plans, specifications and cost estimates for 25 locations
in !\.[assachusetts. Provided expert witness testimony at
public hearings for private developers of
residential! commercial properties. Also responsible for
preparation and presentation of technical proposals and
adherence to budgets, scopes and schedules.
Greenhorne and O'Mara, Inc. - 1979 to 1988. As a
Civil Engineer, prepared project planning studies;
highway plans, specifications and cost estimates, traffic
signal plans, reversible lane (High Occupancy Vehicle)
traffic signal system, right-of-\vay plans, and intersection
geometric plans. Also responsible for training staff in
the use of [ntergraph COGO software.
As a Traffic Engineer, responsible for preparing (wer
ISO traffic impact studies, data collection, safety studies,
road inventories, functional classifications, and expert
. .
witness tesllmony.
.
SHAW ENVIRONMENTAL. INC.
06C122006T
Washington Metropolitan Area Transit Authority,
New Carrollton Metro Station. Project Manager
responsible for preparing the intermodal analysis (rail,
traffic, pedestrian) of the proposed 3,000-car garage,
station, roadway network, existing and proposed
interchange of 1-95 and US-50.
Maryland State Highway Administration. West
Nursery Road, Howard County, MD - Prepared
traffic control plans and final plans and specifications for
4 traffic signals on a 2.4-mile, 6-lane divided highway.
Federal Emergency Management Agency (FEMA),
Flood Insurance Rate Maps and Flood Hazard
Boundary Maps (Nationwide). .As a Junior Engineer,
duties included hydrologic/hydraulic analysis of river
flood stages, and preparation of flood hazard boundary
maps, flood insurance rate maps, water surface profiles,
and reports.
JAMES A. BARRACK JR
3
Amar Chand Bumb, Ph.D., P.E.
.
Why Selected as Key Personnel for Contract
. Over 25 years of experience in process design,
site characterization and remediation of soils
and groundwater
. Managed Commercial and Government projects
ranging in price up to $1 billion
Education
Ph.D., Chemical Engineering, University of \\'yoming,
1987
M.S., Chemical Engineering, University of Wyoming,
1981
B.E., Chemical Engineering, Birla Institute of
Technology & Sciences, 1978
Registrations
Groundwater Professional: Certification #291
Engineer, Chemical: FL, l\L-\, NC, SC
.
Background Summary
Dr. Bumb is a Rcgistcred Professional Enginccr (P.E.),
Certified Ground \\"ater Professional (CG\\l)) and has
more than 25 years of experience in process design, site
characterization and remediation of soils and
groundwater. He is a nationally recognized expert on
fate and transport modeling of saturated and unsaturated
zones, analysis of complex aquifer tests, well field design,
in-situ recovery and treatment and has developed state-
of-the-art methods, including parameter measurement
windows concept, stress-dependent permeability, and
push-pull tests. Dr. Bumb has applied a wide range of
proven and innO\"ative remedial technologies, such as
pump-and-treat with reinjection, soil vapor extraction,
enhanced bioremediation, thermally enhanced recovery,
in-situ treatment, thermal oxidation, and curtain wall.
.
Dr. Bumb has executed and managed projects that
cO\"ered the investigation and remediation of virtually all
em"ironmental contaminants, including inorganic
compounds, radionuclides, chlorinated hydrocarbons,
petroleum products, Heavy fuel oil, polynuclear aromatic
hydrocarbons (P AI-Is), dioxin, pes ticides,
polychlorinated biphenyls (PCBs). His project
experience range from commercial projects as small as
$5,000 to large commercial project up to $64 million to
government projects and tasks in excess of S 1 billion in
\"alue. These projects ha\"e been completed under
Comprehensive Environmental Response,
Compensation, and Liability Act (CERCL\), Resource
Conservation Recovery Act (RCRI-\), underground
storage tank (UST), and state superfund programs as
well under \"oluntary cleanup initiatives. Dr. Bumb has
worked various military installations, U.S. Department of
Energy (DOE) facilities, state Department of
Transportation (00"1) facilities as well as numerous
commercial sites.
Dr. Bumb's regulatory experience includes solid waste
landfill siting/permitting issues; e\"aluation of
applicability of CERCL-\, RCIL-\, Toxic and Hazardous
Substances Control Act ([SCA), state regulations, Phase
I/Phase 1I site assessments and property transfers,
underground injection control (UIC), and deep-injection
disposal \vells. His \vork was instrumental in citing a
nuclear waste repository O\'er a sole-source aquifer in
Fernald, Ohio. He has worked in 9 U.S. Em'ironmental
Protection ;\gency (EP A) Regions.
Dr. Bumb has more than 35 publications on the subject
of site charactcrization, wellfield designs, in-situ recO\"ery
and treatment, and fate and transport modeling and he
has written encyclopedia and book chapters. A
recognized expert in his field, Dr. Bumb has served as
expert hydrologist for legal proceedings.
Relevant Experience
01/1991 - Present, Principal
Engineer/Hydrogeologist, Shaw
Environmental, Inc.
Responsibilities include managing & providing support
to client projects and office staff as a principal
engineer/hydrogeologist. Manage projects. Also
responsible for business development, preparing
technical portions of major construction and design
engineering proposals.
Project Manager, Source Removal Action and
EE/CA Study at the Northeast Chemical Site, Koch
/ Reiss Remediation, Inc., Wilmington, NC.
I\Ianaged two projects at a sulfuric acid production
facility. Site's primary contaminants are lead and arsenic
SHAW ENVIRONMENTAL. INC.
AMAR CHAND BUMB, PH.D., P.E.
06C 122006T
were industrial in nature and were high bay spaces with
mezzanines for equipment access and crane operation.
Project Manager and Architect of Record, The Joint
Institute of Biological Sciences, , The University of
Tennessee, Oak Ridge, TN, 09/2004 -10/2006. The
project is a biological laboratory located at the Oak
Ridge National Laboratory. It is approximately 35,000
square feet and three stories containing 19 laboratories
with support offices, lobby space, eating area and
conference spaces.
05/1993 - 09/2004, Project Architect,
Design Innovations Architects, Inc.,
Knoxville, TN
Responsibilities included architectural oversight of
construction drawings, specifications and bidding
documentation, project management, coordination with
multi-discipline teams of engineers, proposal writing,
project man-hour estimating, procurement of
consultants outside the company, construction
observation and administration, client contact,
coordination with administration for invoicing and
collection, coordination with municipalities having
jurisdiction over the projects, setting company policy,
marketing and interviewing of possible new hires.
The following is a summary of key projects:
Project Architect, Campus Point Apartments, Bostic
Development, Inc., Knoxville, TN, 08/2003 -
09/2004. A multi-family student apartment complex in
the old farmer's market district of historic Fort Sanders
in Knoxville. The complex included 183 story
apartment buildings housing nearly 1200 beds and
included a gymnasium building, pool and student activity
center building and apartments for parental visits. The
design was based on modern planning principles of
separating the vehicular from pedestrian traffic by
providing parking lots on the periphery of the
development on tracks of land across the streets from
the apartments. The apartments then provided
courtyards for pedestrian activity and green space. The
design was a collaboration with the City of Knoxville
Metropolitan Planning Department which assisted in the
approvals, and provided helpful feedback on landscaping
and land planning.
SHAW ENVIRONMENTAL, INC.
06C122000T
Project Architect, Rivertowne Condominiums,
Private Developer, Knoxville, TN, 06/2003 -
09/2004. A new luxury condominium on the waterfrol
on Fort Loudon Lake near down town Knoxville. The
project consisted of five levels containing fifty
condominiums with a single level parking garage for a
total of 6 levels. The project required rezoning of the
property to a Planned Residential Zone which included
planning commission approval of the site and exterior
building design.
Project Architect, The KCDC Office Building, The
Knoxville Community Development Corporation,
Knoxville, TN, 06/2001 - 07/2003. The project
consists of a renovation and addition to KCDC's
existing office space and corporate headquarters. The
existing 3500 square foot building received an additional
two story 18,000 square foot addition to include the
corporate board room, corporate offices, a new main
entry, new administration areas and revised parking and
landscaping.
Project Architect, Jefferson Commons Apartments,
JPI Construction, Inc., Knoxville, TN, 01/1998-
07/1999. Multi-family residential student apartment
complex spread out over five different sites in the
historic Fort Sanders area of Knoxville. There are 11
three story buildings housing over 200 individual
apartments and 800 beds. The buildings were designed
to fit into the community observing existing building
setbacks and siting the parking at the rear of the sites to
maintain green space on the main streets of Fort
Sanders.
Project Architect, The Mortgage Investors Group
Building, Private Developer, Knoxville, TN, 08/1996
- 06/1998. A new corporate headquarters and leasable
office space for the Mortgage Investors Group, Inc. It is
three stories and 35,000 square feet of leasable office
space designed to maximize a difficult site,
Architect, First Utility District Water Treatment
Facility, First Utility District, Loudon, TN, 03/1994
- 06/1996. The construction consisted of three
buildings, a pump house, water treatment facility, and
equipment storage and maintenance facility. The pump
house was constructed on the bank of Fort Loudon
Lake and served as the main intake pump for water to be
GREGORY S. CAMPBELL 2
Project Engineer, MAAP OU-4 Region I
Groundwater Treatment System, USACE, Milan,
TN. Provided engineering support on the design of the
groundwater treatment plant with a design treatment
capacity of 1,300 gpm. The treatment system consisted
of eight groundwater extraction wells installed to
maximum depth of 222 feet, chemical feed system for
pH adjustment, influent tank, sand filtration, drying
beds, granular activated carbon adsorbers and backwash
system, and effluent re-aeration & discharge structure.
Conducted field QA/QC and construction support.
Prepared operations and maintenance (O&IvI) manual.
Lead Engineer, 102nd Street Landfill Superfund
Site, Oxychem and Olin Chemical corporations,
Niagara Falls, NY. Responsible for the design of $16
million aqueous phase licluid (.APL) and dense non
aqueous phase liquid (DNAPL) recovery, loadout
facility, slurry wall, and landfill cap. Design components
included slurry wall, .APL recovery trench, NAPL
recovery wells, embankment/bulkhead extending into
Niagara River, clay and geosynthetic cap, and relocation
of utilities and storm drainage. Surface runoff rates and
infiltration through the landfill cap were estimated.
Detailed engineering was performed to protect Niagara
River and bedrock aquifer while minimizing treatment
cos ts.
Senior Hydrogeologist, Fernald Environmental
Restoration Program, US Department of Energy
(DOE), Fernald, OH. Developed scope of \vork,
supervised subcontractor personnel, and modeled
hydraulics and contaminant migration of radio nuclides at
the Fernald site in support of the RI/FS and remedial
design for the CERCLA/RCRA Unit 2 (CRU2). CRU2
units comprise the Solid Waste Landfill, Lime Sludge
Ponds, South Field, and Flyash Piles. Three dimensional
point and block kriging, a geostatistical technique, was
used to define source terms for a multi-layered, multi-
component S\VIFf-based fate and transport model.
Surface water, seeps, vadose zone, and groundwater
models were linked together to provide inputs for risk
assessment. Used inverse modeling technique to identify
high permeability channels for on site disposal facility
site selection. Also used fate and transport modeling to
demonstrate protectiveness of disposal cell design and
locate disposal cell over a sole source aquifer. HELP
SHAW ENVIRONMENTAL, INC.
06C 122OC6T
model was used to estimate infiltration and runoff rates
from the landfill cap.
Senior Hydrogeologist, Big D Campground, Olin
Chemical, Kingsville, OH. Developed plans,
managed investigation, and modeled hydraulics and
contaminant migration at this Superfund site with
complex boundary conditions. The IvlODFLOW based
model was used to design groundwater extraction system
that differed from the extraction trench system proposed
in the ROD. The fInal groundwater remediation system
consisted of eight wells and an artificial recharge trench.
Revised design resulted in saving of more than $1
million dollars. Supervised construction and assisted in
the startup of the groundwater extraction system.
LandfIll was excavated and contaminated soils and
drums were incinerated using an on site incinerator.
Senior Engineer and Hydrogeologist, RI/FS for Six
Sites, Omaha ID/IQ, Ft. Lee, VAU. Responsible for
hydrogeologic evaluations, fate and transport modeling,
and feasibility study for the maintenance building,
military in field training, reformatory landfill, former
wastewater treatment site, and pesticide mixing sites.
Contaminants of concern include volatiles, semi
volatiles, pesticides, and metals.
Hydrogeologist, Letterkenny Army Depot, US ACE,
Chambersburg, PA. Evaluated multiple dye trace
study data in a karst geology w,ith solutionally enlarged
fractures, voids, sinkholes, springs, and caves. Assisted
in hydrogeologic interpretations, fate and transport
analysis, and develop remedial goals for Southeast .Area
(OUS) RI/FS, Off-post Groundwater (OU6) RI/FS,
and Truck Storage Area (OU7) RI/FS.
Lead Hydrogeologist, ALCOA Point
Comfort/Lavaca Bay Superfund Site, US EPA,
Point Comfort, TX. Provided technical oversight for
the RI/FS work at this site. Contaminants of concern
included mercury, aluminum, and organic contaminants.
Complex hydrogeology includes impacts of salt water
intrusions, fresh water lakes, and man made dredge
island.
AMAR CHAND BUMB, PH.D., P.E.
4
from clinker material and sulfur filter cake. During the
first project, source material containing lead, arsenic, and
sulfur f1lter cake was removed, treated on-site, and
disposed off at a Subtitle D Landfill. The source
material was very acidic (PH less than 1.5) and classified
as hazardous waste material. The source material was
stabilized on-site with Enviroblend (a triple
superphosphate) and neutralized with Portland cement
and/ or limestone screening. The second project was to
develop EE/CA Work Plan, FSP, QAPP, and HASP
and implement them. Project approach used
streamlined human health and ecological risk
assessments to idcntify and remediate soil, sediments,
and groundwater. Groundwater pH was as low as 0.6.
Field X-Ray Fluoresccnce (XRF) analysis was used to
delineate areas requiring removal actions and select
soil/sediment samples for confirmatory analysis by an
off-site laboratory. Lead a project team of five
contractors. Project was completed under an
Administrative Order on Consent bet\veen EP 1\ Region
IV and Respondents.
Project Engineer, Enhanced In-situ
Bioremediation, Storage Technology Corporation,
Palm Bay, FL. Developed \vork plan to conduct pilot
tests to evaluate feasibility of using lactic acid or soybean
oil to in-situ degrade 1,1,I-trichloroethane and 1,1-
dichloroethene. Lactic acid was injected in an area and
site was monitored to define full-scale design
parameters. The purpose of the bioremediation system
was to close the site under the Florida Brownfield
Program. A full-scale bioremediation system is currently
being designed.
Project Engineer, Haines Street Overpass, Florida
DOT, Jacksonville, FL. Evaluated impacts of
construction dewatering on an off-site chlorinated
hydrocarbon plume. A counter pumping system using
dewatering points was designed and implemented so that
the plume's size is not increased and the main part of the
plume did not migrate. Counter pumping dewatering
point locations were adjusted over 5-month construction
period. Options were evaluated for discharge of
extracted and treated water to a surface water body using
an NPDES permit, POT\V, and artificial recharge for
this time critical project. Extracted water was treated
on-site and discharged to a surface water body under a
NPDES permit.
Senior Hydrogeologist, Fleet and Industrial Supply
Center (FISC) Yorktown, LANTDIV, DESC,
Department of Navy, Yorktown, VA. Developed a
site conceptual model based on boring log, site historical
information, and aquifer tests. Conceptual model
included previously unidentified t\vo clay layers that were
critical in defining the distribution of Navy special fuel
oil (NSFO) in the aquifer. Developed a 3-dimensional
model to simulate a coupled fluid and heat transport
model based on the PORFLO\'(! software. Model
included effects of temperature on viscosity of NSFO
that ranged from over 500 centis tokes to 70 centistokes.
\'Vater level changes over a short distance range up to 30
feet. Model \vas calibrated to pre-remediation average
water levels and temperature distribution resulting from
heating with Phase 1 steam lines. Developed capture
zones and effect of steam lines and hot water injection in
support of the Phase 2 system design. System was
designed so that NSFO will not be drawn under a clay
layer and get trapped during seasonal water fluctuations
and cone of depression caused by recovery trenches.
Project Engineer, Chloride Plume at Site 30-3
,
Triple S Corporation (Kerr McGee), Felda, FL.
Conducted slug tests. Used Time Domain
Electromagnetic (fDEI\.I) soundings to determine
horizontal and vertical chloride distribution. One
hundred seventy-six (176) TDEM soundings were used
to survey over 225 acres of citrus groves. Thin-bed
analysis was used to define chloride distribution in 5 to
12 feet thick laycrs to a depth of 214 feet. Information
was used to develop a MODFLOW based fate and
transport model and determine recovery well locations
to control chloride plume and remediate the site.
Designed a remedial system and prepared a Remedial
Action Plan (RAP) that used a deep injection well to
discharge extracted saline water.
Senior Hydrogeologist, Former Metro North
Property (Mott Haven), New York City School
Construction Authority, Bronx, NY, 11/2005-
02/2006. Provided design support for a grout wall that
severed a dual purpose in that it was to provide
additional structural support for school building and to
provide a hydraulic barrier to off-site, up gradient
SHAW ENVIRONMENTAL, INC.
2
06C 122006T
AMAR CHAND SUMS, PHD., P.E.
e
contaminants flowing onto thc property via
ground\vater. A sheet-pile wall perpcndicular to the
grout wall was also part of the dcsign. r,[ODFLO\,(!
based groundwater model was developed to e,'aluate
potential groundwater mounding created by the
proposed grout wall and sheet-pile wall and to determine
thc likelihood of contaminated groundwater flowing
O\'er the top the proposed grout wall. r,[odel simulated
the hydraulics of the aquifer for an area of approximately
2,200 feet x 3,400 feet is size with 10 vertical layers.
Significant topographic relief occurred \vith the modeled
area that resulted in complex lithologic sequence.
Hydraulic conducti,'ities of the grout wall and sheet-pile
wall and the relati,'e depth of the hydraulic barrier with
respect to the top of competent rock \vere varied to
determine the sensiti,'ity of the predicted groundwater
mound and determine the likelihood of contaminated
groundwater flowing over the grout wall. Using the
results of the ground\vater model, a recommendation
was made for design of the grout wall and sheet-pile
wall.
.
Project Engineer, MAG-1 Area Remediation, Ft.
Dix, NJ, 3/2006-Present. De,.eloped fate and
transport model using ~[ODFLO\\' and RT3D in
support of designing an in-situ enhanced bioremediation
of chlorinated sokent plume. A 3-D regional model
cm'ering approximately 8,300 feet x (i,200 feet area was
de,'eloped to capture complex hydrogeology of the site
that includcd se"eral streams, \vetlands, and a regional
aCluifer that was influenccd by groundwater supply wells.
.-\ local was model was then de,'eloped for contaminant
transport \vithin the plume area. De,'eloped pilot test
work plan. Currently, awaiting appro,'al of the pilot test
\vork plan to implement it in the field.
.
Project Hydrogeologist, Building 505 (SWMU
79/80), Former Myrtle Beach Air Force Base,
Myrtle Beach, SC, OS/2005-02/2006. De,'eloped a
groundwater model to simulate remediation of
trichloroethene and daughter product plume. The
shallow and deep groundwater aCluifer were impacted.
The shallow groundwatcr is influcnced by drainage
ditches. This resulted in groundwater flow occurring in
opposite directions in the shallow and deep zones that
are separated by a silty clay layer. A regional flow model
covering approximately 3 mile x 3 mile area was
SHAW ENVIRONMENTAL, INC.
06C122006T
developed to capture complex hydrogeology and pro,'ide
boundary conditions for a local model for 500 feet x 500
feet plume. r,[odel was uscd to predict under what
conditions acti,'e remediation system can bc shut down
and let natural attenuation take m'er.
Lead Engineer, Defense Fuel Supply Point, Defense
Energy Supply Center, Charleston, SC. Responsible
for the investigation and design of soil npor recovery
and groundwater trcatment system to remove JPA
contamination. Treatment system consisted of oil-water
separation, air stripping, carbon adsorption, and
reinjection. Therc are at least four scparate plumes
impacting residential and industrial properties.
Dc,.eloped corrective action plans (Cl\PS), site-specific
target le,'els (SSTLs), obtained pcrmits, and prm'ided
regulatory interface. Enluated existing system,
conducted fate and transport modeling, and optimized
grounchvater remediation system.
Project Engineer, 1-10/1-95 Interchange, Florida
DOT, Jacksonville, FL. Dcsigned dewatcring systcm
and temporary water treatment plant to rcmO\'c organic
contaminants. Treatment s)'stems included filtering, air
stripping, and carbon adsorption.
Hydrogeo[ogist, Sarasota Maintenance Yard,
Florida DOT, Sarasota, FL. Used RT3D to determine
sources of chlorinated sokents. r,[odel rcsults indicated
that off-site sources were responsiblc for contaminants
scen at the site. This work lead the FD EP to pursue
responsible party for off-sitc contamination. l\lso
directed field ilwestigations.
Abandoned Landfill, Abandoned Landfill,
Confidential, Upstate, Sc. Pro,'ided expert testimony
on site h)'drogeology, conceptual model, and
contaminant migration from an abandoned landfill in a
fractured aCluifer. The court ga"e a judgment in favor of
the client.
Senior Hydrologist, Coleman-Evans Superfund Site,
USACE, Whitehouse, FL. Reviewed work plans and
design documents and participated in coordination
mcctings for groundwater operable unit and additional
soil sampling along General Avenue and water treatment
facility.
AMAR CHAND BUMS, PH.D., P.E.
3
Gregory S. Campbell, A.I.A.
.
Education
Bachelor of Architecture, Architecture, Uni,'ersity of
Tennessee School of Architecture and Design, 1993
Registrations
Architect: NM, SC, TN, TX
Background Summary
.
l'v[r. Campbell has 14 years of experience as a project
architect and project manager for printe, commercial
and government projects. Projects designed and
managed range from commercial and government
interior and exterior renm"ations, large
renm"ation/ addition of multiple facility types, office
buildings, retail facilities, multi-family residential,
industrial facilities, laboratories, churches, food services,
educational and Department of Energy demolition,
reno,'ation and new construction projects, water
treatment facilities as well as master planning of large
multi-use sites from 20 acres up to 400 acres including
site and building planning. Projects ranged in cost from
510,000 up to (wer 528 million ill COilS tructioll. The
projects' clientele spanned pri,"ate de,'e!opers,
commercial de,"elopers, State and Federal Gm'ernments,
Industrial/1\fanufacturing companies, private utilities and
corporate businesses. 0.L:. Campbell also has experience
coordinating with construction contractors through a
,"ariety of deli,'ery approaches, such as design-bid-build,
design-build, design-negotiate with ilwited contractor,
and with a ,"ariety of contracts such as lump sum, time
and material with a guaranteed maximum, etc.
Relevant Experience
10/2006 - Present, Project Architect,
Shaw Environmental & Infrastructure, Inc.
Responsibilities include design and detailing of
architectural discipline work in conjunction with multi-
discipline teams and coordination with other team
members and project management.
.
SHAW ENVIRONMENTAL, INC.
06C 112006T
09/2004 - 10/2006, Project Architect,
Pro2Serve, Inc., Engineering, Oak Ridge,
TN
Responsibilities included architectural oversight of
construction drawings, specifications and bidding
documentation, project management of State of
Tennessee and Department of Energy projects.
Responsibilities also included coordination with multi-
discipline teams of engineers, proposal writing, project
man-hour estimating, procurement of consultants
outside the company, construction observation and
administration, client contact and coordination with
administration for billing and collection.
The following is a summary of key projects:
Project Architect and Assistant Project Manager,
National Security Engineering Center, Pro2Serve,
Inc., Oak Ridge, TN, 10/2005 - 10/2006. The facility
is to SetTe as the coqxlrate headquarters and central
engineering complex for Pro2Setye, Inc. I t is a 100,000
square foot facility, three stories with a partial basement
that will house the headquarters of all di,'isions of
Pro2SetTe, Inc., the corporate headquarters and all
adminis trative functions.
Project Manager, Estabrook Hall Renovation, The
University of Tennessee, Knoxville Campus,
08/2005 - 10/2006. The project consists of demolition
and reconstruction of Estabrook Hall into a state of the
art engineering educational facility to house the Ci,'il
Engineering School for the University of Tennessee.
The building is approximately 80,000 square feet and has
the added complication of being next to and needing to
incorporate new entry features for Neyland Stadium a
100,000+ seat football facility.
Project Architect, Beam Lines 5 and 7 - Spallation
Neutron Source, DOE - Oak Ridge National
Laboratory, Oak Ridge, 04/2005 - 10/2006. The
project consisted of two exterior additions to the
existing Spallation Neutron Source Target Building. The
buildings were approximately 1500 square feet for Beam
Line 5 and 2500 square feet for Beam Line 7. The
buildings housed complex eCjuipment for evaluation of
materials bombarded with neutron radiation. Each
building had a concrete vault for shielding, Beam Line 5
vault was also filled with Argon gas. These buildings
GREGORY S. CAMPBELL
.
.
.
treated at the plant to seryice the First Utility District.
The water treatment facility was a 20,000 square foot
facility containing multiple tanks, pumping stations and a
main control facility for the plant. The storage and
maintenance facility prO\'ided storage for replacement
parts, \'ehicle storage, chemical storage, etc. for the
facility.
SHAW ENVIRONMENTAL. INC.
GREGORY S. CAMPBELL 3
06C 122006T
.
-'
<<
U)
a
<l.
a
'"
<l.
U)
I
f-
"-
a
w
"
<<
<l.
~
f-
;:::
W
I
f-
Z
a
z
a
;:::
u
a:
f-
U)
W
'"
W
I
f-
a
f-
.~
U)
~
f-
W
W
I
U)
~
I
f-
Z
a
o
w
Z
;;;:
f-
Z
a
u
<<
f-
<<
o
"-
a
w
'"
:J
U)
g
u
U)
o
'"
a
w
U)
:J
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Roy W. Case, P.E.
Senior Mechanical Engineer
Why Selected as Key Personnel for Contract
. Extensive experience in HV AC system design,
and plumbing and fire protection systems for
industrial, commercial, and institutional
projects
. 40 years of mechanical facilities engineering
experience
Education
B.S., t\lechanical Engincering, Northeastcrn University,
1965
Registrations
Professional Engineer: Mechanical, t\IA, N], OH, R[
Background Summary
i\ [r. Casc has m'cr -1-0 ycars of engineering experience
including all aspects of mechanical facilitics engineering,
technical staff super;ision, projcct engincering, and
project managcment. He is able to provide technical
direction for large projccts, and can prm-ide overall
project coordination including scheduling and progress
monitoring for both large and small projects.
i\lr. Case has extensi\'e experience in HVAC system
design including industrial, commercial, and institutional,
transportation, and research projects. He has experience
in designing large and small systems, from single room
applications to large central systems including central
heating plants and district heating/ cooling distribution
systems. His expericnce has also included design of
computer room systems, clean room facilities, low
humidity rooms, paint spray rooms, cncrgy rccovery
systems, hazardous area systems, and dust collcction and
suppression systems.
i\[r. Case is experienced in the design of plumbing and
fire protection systems for industrial, commercial, and
institutional buildings.
He is experienccd in thc design of mcchanical support
systems for various process applications such as
compressed air, lube oil distribution, steam and
condensate return, vacuum, cooling water, dust
collection, and water treatment systems.
I SHAW ENVIRONMENTAL, INC.
06C122006T
t\lr. Case has experience in the planning, scheduling, and
ovcrall supervision of technical project activities
including staffing, cost tracking, and technical interface
with clicnts.
Relevant Experience
1973 - Present, Shaw Environmental &
Infrastructure, Inc.
Aberdeen Chemical Agent Disposal Facility,
Edgewood, MD Oune 1999 to present)
Jan. 2002 to present. Senior Engineer in charge of the
design, and installation of the utility systems for a
Chemical Demilitarization Facility, including fire
protection, steam, water, chilled water, plumbing,
compressed air, and HV AC systems including the
cascade \'etllilation system.
Provided mechanical engineering support of plant
operations including system and equipment upgrades to
support c\'oh'ing plant needs.
He provided support for decommissioning and
demolition activities including preparation of turnm-er
packages and denloping decontamination techniclues.
Sincc Fcb 2002, work has consisted of performing
engineering design directly for the systems contractor,
first during construction, then in support of plant
operations activities, and sincc Feb 2006, for
decommissioning acti\'ities.
June 1999 to J an 2002. Lcad facility and utility engineer
on a project for the U.S. [\rmy to review and monitor
the design and construction of a mustard agent disposal
facility. Responsible for HVAC, plumbing, fire
protection, compressed air, steam, condcnsate return,
fuel oil, spent decontamination fluid, and plant water
systems. Work for the first 2-1/2 years included design
document reviews, design change evaluations, cost
estimates, schedule monitoring, and providing technical
advice to the Army and the systems contractor.
Municipal Waste Composting Facility, Waste
Options Inc., Nantucket, MA (Mar 1998 - June
1999). Lead mechanical enginecr on an Ere contract to
design a 50-ton per day compost facility with a
construction cost of twelve million-dollars. Responsible
for designing the HV AC, plumbing, and fire protection
ROY W_ CASE Q
.
-'
0<
(f)
o
a.
o
0:
a.
(f)
I
I-
u.
o
w
Cl
0<
a.
"j
I-
;::
W
I
I-
Z
o
Z
o
;::
u
0:
I-
(f)
W
0:
W
I
I-
o
I-
.i
(f)
'<l
I-
W
W
I
(f)
(f)
I
I-
Z
o
o
w
z
;j'
I-
Z
o
U
0<
I-
0<
o
u.
o
W
0:
::>
(f)
g
u
(f)
is
0:
o
W
(f)
::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
systems, and laying out the mechanical process
equipment. Prepared specifications for process
equipment, reviewed bids, and selected equipment
,'endors. Also responsible for monitoring the
mechanical construction effort, responding to RFI's
from the field, and inspecting the \\lork of the
mechanical contractor.
Bus Maintenance Facility, Rhode Island Public
Transit Authority, Providence, Rhode Island (Mar
1997 - Dee 1998). Lead mechanical engineer for the
design of a sixteen million-dollar bus maintenance
facility serving a total of 130 diesel and CNG fueled
busses. Maintenance activities included major
rebuilding, (engines and transmissions), body shop and
painting, engine and chassis dynamomcter testing, as
well as brakcs, tires, alignment, routine servicing, and
emergency repairs.
U.S. Department of State, Office of Foreign
Building Operations G une 1986 to Oct 1998),
Indefinite Quantity Contracts. :\ctcd as project
manager for the design of ,.at,ious projccts for thc State
Department. Specific projccts included an addition to
the consular facility at Islamabad, Pakistan, redesign of
the consular facility at Panama City, Panama, and design
of an HV AC system upgrade and window replacement
project for the Embassy at Rangoon, Burma. Lead
mechanical engineer for a numbcr of projects including:
Public Access Control modifications at Embassies in
South America, Africa, Asia, and Europc; chiller plant
replacement for the consulate in Rio de Janeiro, Brazil;
rchabilitation of a 16 story office building in Panama;
and a new 50,000 square foot embassy office building in
Budapcst, Hungary.
Boston, Massachusetts - Massachusetts Highway
Department Gune 1994 - Mar 1998). Lead mechanical
engineer for the 09C section design performed by the
team of Berger, Lochner, Stonc and \'\/ebster. Duties
consisted of design of the fire standpipe system for the
project viaducts and boat sections, drainage of viaducts
and bridges, and the mechanical and hydraulic design for
stormwater pumphouse No.7.
I SHAW ENVIRONMENTAL. INC.
06C 122006T
Third Harbor Tunnel Engineering Design Review
Team, Boston, Massachusetts - Massachusetts
Turnpike Authority (Dee 1993 - June 1994). Lead
mcchanical engineer responsiblc for coordinating thc
mechanical effort to revicw the design and start-up
testing of the tunnel ventilation system and firc
protection and drainage systems. This \\lork included all
of the tunnel mechanical systems as well as the
mechanical work on the supporting structures including
the vent buildings, administration building, operations
center, and State Police Station.
Ventilation Study for Miami International Airport,
Miami, Florida - Dade Aviation Consultants Ouly
1997 - Feb 1998). Technical advisor for a study to
determine the ventilation rC(luirements for the lowcr
,'ehiclc dri,'e that serves the arri,'als area at Miami
[ntcmational :\irport. The purpose of thc study is to
determine the ventilation requirements for this area of
the airport and to dc,'clop mechanical and structural
criteria for use in designing systems to maintain
contaminants within acceptable lc,'els.
CNG Bus Maintenance and Storage Facility, Akron
Ohio - Metro Regional Transportation Authority
(Sept 1996 - June 1997). Lead mechanical enginccr for
a project to upgrade the mechanical systems for a bus
maintenance, fueling, and storage facility to
accommodate CNG fueled "chicles.
Hemphill Power Plant HV AC Modifications,
Springfield, New Hampshire - Thermo Energy
Systems (Mar 1996 - JuI1996). Designed pressurizcd
enclosures for the stand by generator and thc electrical
switchgear to protect them from the airbome dust in a
wood/bark buming power station. The systems
included filtered make up air for pressurization and
heating as requircd for winter operation.
IAQ Investigation and HV AC System
Modifications, Cambridge, Massachusetts -
MyoGenics Inc. (Apr 1995 - JuI1995). Project
Engineer for a study to im'estigate indoor air quality
concems for a research laboratory. The project included
air monitoring for the facility, system evaluations, and
design of HV AC modifications to improve air quality in
the office and lab areas.
ROY W. CASE I~
.
.J
<(
en
o
c.
o
a::
c.
en
I
f-
u.
o
w
CO
<(
c.
~
f-
>=
W
I
f-
Z
o
Z
o
>=
()
ii:
f-
en
W
a::
W
I
f-
a
f-
.i
en
!Q
f-
W
W
I
en
en
I
f-
Z
o
a
w
z
<i'
f-
Z
o
()
<(
f-
<(
Cl
~
w
a::
::J
en
'3
()
en
is
a::
o
w
en
::J
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Hanscom AFB Indefinite Quantity Contracts,
Bedford, Massachusetts - U.S. Air Force (Apr 1993-
Jan 1994). As Project Manager responsiblc for the
tcchnical, budget, and schedulc performance of the team
for various projects. Specific tasks included laboratory
renovations at Buildings 1120 & 1128, HV AC analysis of
Buildings 1600 & 1141, and the rcdesign of the entire
HVAC systems for Buildings 1612 & 1624 including the
design of an ice storage facility to serve the chilled water
system.
Rail Facilities Maintenance Rehabilitation, New
Haven, Connecticut - Connecticut DOT (Dec 1987
- Mar 1988). As Lead Mechanical Engineer, t\[r. Case
supelTised the design of all mechanical facilities for the
car shop and diesel shop rehabilitation projects at thc
New Ha"en Rail Yards. \,\'ork includes design of
HV AC, plumbing, and fire protection systems for two
major repair shops including shop arcas, officc areas,
locker rooms, and other personnel areas. He also
provided support for industrial cnginecring including
specialized ventilation, drainage and compresscd air
s\'stems.
Windsor Maintenance Facility, Windsor,
Connecticut - Connecticut DOT (Mar 1988 - Jan
1989). As Lead t\[echanical Engineer, Mr. Case designed
HV AC, plumbing and fire protection systcms for a
highway "chicle maintcnance facility including
preparation of specifications and estimates and
supen'ising the preparation of thc drawings. Post design
,vork consisted of shop drawing review and construction
inspection. Special systems designed included fuel
dispensing and monitoring systems.
Runcorn Coating Facility Gan 1989 to Nov 1990),
Runcorn, United Kingdom - James River Graphics.
As Lead Mechanical Engineer, t\[r. Casc supervised the
design of HV AC, plumbing and fire protection systems
for a film coating facility in the United Kingdom. Work
included specifications, drawings, and estimates. Special
systems included fume collection, class 100 and 1000
clean rooms, low humidity rooms, and fume
incineration. This project required familiarization with
codcs and standards for the United Statcs and United
Kingdom as well as availability of e(luipment overseas.
Mr. Case was in close contact with British contractors
throughout construction and startup.
I SHAW ENVIRONMENTAL, INC.
06G 122006 T
A VLIS Facility (Mar 1984 to Dec 1984), Livermore,
California - Lawrence Livermore Laboratories. As
Lead Mechanical Engineer, t\[r. Case was responsible for
developing the mechanical systems design for a laser-
based uranium cnrichment facility. These systems
included process cooling water, site drainage, HV1\C,
plumbing, and fire protection. The design included
systems to support clean rooms, optical clean rooms,
low humidity optical rooms (3% rh), contamination
containment systems, fire protection, and other safety
systems. t\[r. Case was responsible for interfacing with
the scientists developing the enrichment process to
determinc building and mcchanical system nceds to
support all phases of the process.
North Anna Power Station, Unit 3 (Feb 1982 to Jan
1983), North Anna, Virginia - Virginia Electric
Power Co. As Assistant Project Engineer, Mr. Casc was
rcsponsible for cstablishing and maintaining schedules,
monitoring progress, and providing supelTision for the
mechanical, electrical, con trols, geotechnical, and nuclear
technology disciplines for the project. He coordinatcd
,vith the various divisions to maintain project staffing for
cach group and provided personnel cvaluations to the
divisions. 0.[r. Case cstablishcd a mechanical cquipment
qualification program to establish cm'ironmcntal
qualification standards for the mechanical cquipment
used in safety-related plant systems.
ROY W. CASE [2]
.
-'
<(
(/J
o
Q.
o
0::
Q.
(/J
I
>-
u.
o
w
'"
<(
Q.
~
>-
>=
W
I
>-
Z
o
Z
o
>=
u
ir
>-
(/J
W
0::
W
I
>-
o
>-
.i
(/J
'!2
>-
w
W
I
(/J
(/J
I
>-
z
o
o
w
z
:;:
>-
z
o
u
<(
>-
<(
o
u.
o
W
0::
:::J
(/J
g
u
(/J
o
0::
o
W
(/J
:::J
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Thomas Y. Chang, Ph.D., P.E.
Why Selected as Key Personnel for Contract
. Extensive experience in geotechnical
engineering applied to dams and reservoirs
. Expert in the analysis and modeling of geotechnical
problems including dam stability, deformations, and
ground water flow
. Responsible for seepage analysis for several dam
projects located in Florida
Education
Ph.D., Geotechnical Engineering, Ohio State University,
I 97-J.
t\LS., Geotechnical Engineering, Univcrsity of Rhodc
Island, 1%9
B.S., Civil Engineering, National Taiwan Uni\Trsity,
1%3
Registrations
Professional Engincer: Gcotcchnical, RI
Background Summary
Dr. Chang a Senior Lead Engineer with O\'cr -1-2 ycars of
experiencc in ci\"il engincering; for thc last 37 hc has
specialized in soil and foundation engineering. He has
worked on \"arious sizcd industrial, commcrcial, and
utility buildings and structures as well as ci\.il \V"orb
including highways, sewer and water treatment facilities,
wastc disposal facilities, dams, and waterfront structures.
He has evaluated excavation and backfilling opcrations,
piling and drilled pier installations, in-situ dcnsification,
and preload placcment relatcd to foundation dcsign. His
expcricnce includes supervising gcotcchnical cngineers
and geologists in performing sitc invcstigations,
laboratory testing, specification preparation, and serving
as field liaison during cons truction.
Dr. Chang's expertise also includes earthquake
engincering and the application of numerical modeling
to various geotechnical and groundwater cngincering
problcms. He has performcd scismic risk analyscs and
established seismic design criteria and response spectra
for several nuclear power plants. He has developed a
finite element computer program for nonlinear elastic
SHAW ENVIRONMENTAL, INC.
06C122006T
load deformation analysis of soils. He has employed
finite elemcnt methods with nonlinear material
properties to compute stress and displacement patterns
within the dam and to study arching beha\'iors bet\vccn
zones and stress transfcr ncar foundation irregularitics
for various dam protcctivc dcsigns. His experiencc in
geotechnical analyses includes the hydro-geological
modeling of groundwater and seepage problems. Dr.
Chang was responsible for seepage and groundwater
analyses for three cooling pond dikes that rcquired
remedial work to control seepage and enhance safety.
Dr. Chang was also responsible for groundwatcr
modcling of the oil waste land treatmcnt facilitics for
pollutant migration and contamination monitoring study.
Dr. Chang has also performed static and dynamic soil-
intcraction structure analyses, foundation study and
design, and slopc stabilitics for nuclcar and fossil powcr
plant facilities.
As Di\"ision Tcsting Spccialist, Dr. Chang is rcsponsible
for the O\"erall technical capability and pcrformancc of
the Geotechnical Tcsting Laboratory. He has cxtensi\"e
experiencc in determination of various soil and rock
propcrtics for cngineering purposes. This cxpericnce
includes establishing the relationship bctwccn laboratory
test data to field performancc cvaluation of soil-structure
intcraction problems. He also has been responsible for
testing various mining and industrial solid wastc
matcrials such as coal refusc, tailing sands, and gypsum
waste from mining operations, paper sludge, silica
fumes, steel slag, and fly ash.
Relevant Experience
11/1976 - Present, Senior Lead
Geotechnical Engineer, Shaw
Environmental & Infrastructure, Inc.
As Division Tcsting Specialist, responsible for overall
tcchnical capability and performance of the
Geotechnical Laboratory. Responsibilities include
defining nceded testing capability, re\"iewing testing
procedures and techniclues, updating calibration
procedurcs, training the testing cngineers and
technicians, and taking necessary steps to ensure that
needed lluality of testing work is developed and
maintained. Also works with each project group in
developing and reviewing testing programs, interpreting
THOMAS Y. CHANG
.
...i
<(
(/)
o
0-
o
0:
0-
(/)
I
I-
U.
o
w
'"
<(
0-
W
-'
I-
>=
W
:r:
I-
z
o
z
o
>=
u
ii:
l-
(/)
w
0:
w
:r:
I-
o
I-
.i
(/)
~
I-
W
W
:r:
(/)
(/)
I
I-
Z
o
o
w
Z
<(
I-
Z
o
u
<(
I-
<(
o
u.
o
w
0:
=>
(/)
g
u
(/)
o
0:
o
W
(/)
=>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
test results, and establishing soils and rock parameters
for use in engineering analysis.
/\.1so, please refer to project experience.
The following is a summary of key projects:
Geotechnical Consultant, Bridgeport Harbor
Station Unit 3 Mercury Control System, PSE&G,
Bridgeport, CT, 03/2006 - Present. As Geotechnical
Consultant, provided technical consultation and review
of calculations to determine seismic site class, allmvable
pile load and ( for booster fans) dynamic stiffness of pile
foundation. Reviewed results of pile load tests to
determine the allowable pile load capacity.
Geotechnical Consultant, Brunner Island Unit 3
ESP & FGD Projects, Pennsylvania Power and
Light, York Haven, PA, OS/2005 - Present. As
Geotechnical Consultant, provided technical
consultation and re\.iew of calculations determinc the
seismic site class, allowablc pile loads and (booster fan
fans) dynamic stiffncss of pilc-supported foundation.
E\'aluated methods for pro\'iding lateral support of a
deep exca\'ation in loosc, saturated tly ash fill.
Geotechnical Consultant, Mixed Oxide (MOx) Fuel
Fabrication Facility, US Department of Energy -
Chicago Operations Office, Aiken, SC, OS/2002-
Present. As Geotcchnical Consultant, provide technical
consultation and review of various geotechnical analyses
which including seismic site response analysis,
liquefaction analysis, slope stability analysis and
settlement analysis. Provided critical reviews and
comments for the Site Geotechnical Report to ensure its
technical ade(luacy for NRC permit licensing application.
Lead Geotechnical Engineer, MBTA 1-90/1-93
Coordination Services, Massachusetts Bay Transit
Authority (MBTA), Boston, MA, OS/2002 - Present.
As Lead Geotechnical Engineer, responsible for
geotechnical design adequacy review of the construction
of Central Artery/Third Harbor Tunnel structures near
or crossing the r-.IBTA facilities. The efforts include all
aspects of structures, especially soil-structure interaction
analyses and construction impact and disturbance
evaluation to ensure safe operation of the MBT[\
facilities during construction of the [-90/1-93 structures.
SHAW ENVIRONMENTAL. INC.
E\'aluated and commented on the proposed
underpinning of the South Station Red Line to permit
the construction of northbound leg of the Central .Artery
beneath the station using mined tunneling in conccrt
with pipe-jacking techni(lues. Provided critical tcchnical
revie\vs and commented on the methods of computing
stresscs changes of the MBTA Red Line tunnels due to
the construction of 1-90 Fort Point Channel tunnel
crossing. In addition, recommended the use of
parametric study to analyze construction sequencing and
its effect on the stresscs of the Red Line tunnels.
Pro\'ided comprehcnsi\'c tcchnical re\'iews and
commented on the impacts of jacking full-section
highway tunnels beneath South Station railroad yard and
constructing deep cut-and-cO\'er tunnels adjacent to the
railroad tracks. Provided critical technical revicws and
commented on ground freezing as soil stabilization
method for improving face stability during tunneling.
Rc\'ic\V and commcnted on the underpinnings dcsign of
North Station platforms and railroad tracks, and Grecn
Linc Scicnce Park Station to facilitate 1-90/1-93
construction beneath thesc structurcs. Rcvicwand
commentcd on thc proposed NATl\1 tunneling with
Door Framc p.-lethod of construction under the North
Station platforms and railroad structures.
Geotechnical Consultant, Westlake Styrene
Revamp, Weslake Chemical, Sulphur, LA, 08/2006 -
11/2006. As Geotechnical Consultant, rc\'iewcd cxisting
geotcchnical data, the design calculation of the augured
cast-in-place (ACIP) piles and settlements of proposed
pile-supportcd foundations.
Geotechnical Consultant, Mercer Station Units 1 &
2, PSE&G, Hamilton Township, N], 11/2005-
01/2006. As Geotechnical Consultant, reviewed existing
geotcchnical reports and proposed Powdered Carbon
Silo foundation to assess the need for piles for support
of the foundation. Also performed calculation of thc
suitability of pipe piles recommended for support of the
Powdered Activated Carbon Silo foundation.
Geotechnical Consultant, Independent Fuel Storage
Installation, 101893, Monticello Nuclear Generating
Plant, Monticello, MN, 06/2004 - OS/2005. 1\S
Geotechnical Consultant, provided technical
consultation for development of field programs and
THOMAS Y. CHANG
2
06C 122006T
e
-'
..
(f)
a
a.
a
'"
a.
(f)
I
f-
...
a
UJ
'"
..
a.
~
f-
>=
UJ
I
f-
Z
a
z
a
>=
u
ii:
f-
(f)
UJ
'"
UJ
I
f-
a
f-
ei
(f)
~
f-
UJ
UJ
I
(f)
(f)
I
f-
Z
a
o
UJ
z
;;'
f-
Z
a
u
..
f-
..
o
...
a
UJ
'"
::>
(f)
g
u
(f)
is
'"
a
UJ
(f)
::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
associated engineering services scopes of work for
performing subsurface im"estigations required to
document existing conditions for preparation of the
Ccrtificate of Nced and for gcotcchnical cffort
associated with licensing and design of thc foundations
of thc proposed [ndcpcndent Spent Fuel Storage
Installation (ISFSI) and to comply with US Nuclear
Regulatory recjuirements. Re\"iewed design calculations
for the stability, licjuefaction of the site and the
preparation of gcotechnical criteria, and the geotechnical
report.
Geotechnical Consultant, Independent Spent Fue
Storage installation, 58209, Fort Calhoun Station,
Omaha, NE, OS/2003 - 07/2004. As Geotcchnical
Consultant, re\.iewed thc dcsign calculations for seismic
stability and lic!uefaction of the site of the [ndcpendent
Fuel Storage Installation. Also re\"iewed the preparation
of geotechnical dcsign criteria and geotechnical report.
Geotechnical Consultant, Independent Spent Fuel
Storage Installation, Duane Arnold Energy Center,
Palo, lA, OS/2002 - 09/2002. ,\s Geotechnical
Consultant, performed technical revic\v for \"arious
methods of site im"estigation, formulated static and
d~'namic laboratory soil testing program, interpreted soil
strength and compressibility parameters for bearing
capacity and scttlement calculations, preparcd the
Laboratory Testing Section for the Geotechnical Report
for the Independent Fuel Storage Installation.
Geotechnical Consultant, Private Fuel Storage
Facility - Skull Valley, UT, Private Fuel Storage,
L.L.c., Skull Valley, UT, OS/2002 - 06/2002. As
Geotechnical Consultant, performcd tcchnical review for
various methods of site investigation, formulated static
and dynamic laboratory soil testing program, interpreted
soil strength and compressibility parameters for bearing
capacity and settlemcnt calculations. Provided technical
input and re\"iew for the responscs to NRC and State of
Utah inc]uiry cjuestions generated for pre-public hearing
of the licensing of the facility. Performed technical
reviews of the geotechnical design criteria and soil
structurc interaction calculations.
Geotechnical Consultant, Marcus Hook
Cogeneration Plant, PG&E National Energy Group,
Marcus Hook, NJ, OS/2002 - 06/2002. As
I SHAW ENVIRONMENTAL, INC.
06C'22006T
Geotechnical Consultant, performed adequacy review
for stability analysis of the perimeter slope at the site of
combined cycle power plant and re\"iewed the shear
strength parameters used for the stability analysis.
Provide the method for slope stability analysis using the
anchor pilcs to stabilizing the slope with marginal factor
of safety.
Geotechnical Consultant, Covert Generating
Project, PG&E National Energy Group, Covert,
Michigan, OS/2002 - 06/2002. As Geotechnical
Consultant, performed adecjuacy review for pile
foundation design, formulated pile load test program,
interprcted pile design capacity for the foundation design
of the main structures. Performed engineering
e\"aluations to calculate the axial and horizontal spring
constants and damping ratios for use in the dynamic
analyses of thc Gas Turbine/ Generator.
Geotechnical Consultant, Mixed Oxide (MOx) Fuel
Fabrication Facility, US Department of Energy -
Chicago Operations Office, Aiken, SC, 10/2001-
04/2002. As Geotechnical Consultant, prm"ide
technical consultatioll and re\"iew of \"arious geotcchnical
analyses \\'hich including scismic site responsc analysis,
liquefaction analysis, slope stability analysis and
settlement analysis. Prcwided critical re\.iews and
comments for the Site Geotechnical Report to ensurc its
technical adecluacy for NRC permit licensing application.
Geotechnical Consultant, Independent Spent Fuel
Storage Installation, Duane Arnold Energy Center,
Palo, lA, 03/2001- 04/2002. As Geotechnical
Consultant, pcrformed technical rcvicw for \"arious
mcthods of sitc im"cstigation, formulated static and
dynamic laboratory soil tcsting program, interpreted soil
strength and compressibility parameters for bearing
capacity and settlement calculations, prepared the
Laboratory Testing Section for the Gcotcchnical Report
for the Independent Fuel Storage Installation.
Geotechnical Consultant, Covert Generating
Project, PG&E National Energy Group, Covert, MI,
03/2001- 04/2002. As Geotechnical Consultant,
performed adecluacy review for pile foundation design,
formulated pilc load tcst program, interprctcd pilc dcsign
capacity for the foundation design of the main
structures. Performed engineering evaluations to
THOMAS Y. CHANG [2]
.
.J
<(
U)
o
Q.
o
'"
Q.
U)
I
>-
U-
o
w
to
<(
Q.
W
-'
>-
;::
w
I
>-
Z
o
Z
o
;::
u
ii:
>-
U)
W
'"
W
I
>-
o
>-
.~
U)
'!!
>-
w
W
I
U)
U)
I
>-
z
o
o
w
Z
;;:
>-
z
o
u
<(
>-
<(
o
U-
o
w
'"
::::>
U)
g
u
U)
o
'"
o
w
U)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
calculate the axial and horizontal spring constants and
damping ratios for use in the dynamic analyses of the
Gas Turbine/ Generator.
Geotechnical Consultant, Marcus Hook
Cogeneration Plant, PG&E National Energy Group,
Marcus Hook, PA, 03/2001- 04/2002. i\S
Geotechnical Consultant, performcd adequacy review
for stability analysis of the perimeter slope at the site of
combined cycle power plant and reviewcd the shear
strength parameters used for the stability analysis.
Pro\'ide the method for slope stability analysis using thc
anchor piles to stabilizing thc slopc with marginal factor
of safcty.
Geotechnical Consultant, Private Fuel Storage
Facility - Skull Valley, UT, Private Fuel Storage,
L.L.c., Skull Valley, UT, 04/1998 - 04/2002. As
Geotechnical Consultant, performed technical review for
\'arious methods of site investigation, formulatcd static
and dynamic laboratory soil tcsting program, intcq1retcd
soil strength and compressibility paramctcrs for bcaring
capacity and settlcmcnt calculations. Pnn'ided technical
input and re\.iew for thc responscs to NRC and Statc of
Utah inquiry questions generated for prc-public hearing
of the licensing of the facility. Pcrformed tcchnical
rc\'iews of the geotechnical design criteria and soil
structurc interaction calculations.
Geotechnical Consultant, Canneleton Locks and
Dam, PG&E National Energy Group, IN, 03/2001-
06/2001. As Geotechnical Consultant, provided
independent review of the existing rock and soil
laboratory testing data to assess thc shcar strcngth
properties used for the dam foundation. The shcar
strength information was used to e\'aluate the stability of
the concrete gravity structure that incorporatcd a
proposed hydroelectric generating unit.
Geotechnical Consultant, FERC safety-Related
Work, Tapoco and Yadkin Projects - PB Power,
NC, 03/2000 - 06/2001. As Geotechnical Consultant,
provide geotechnical engineering services to PB Power
for FERC safety-related works at Santeetlah and Cheoah
dams. As part of the work, revicwed stability
calculations and responses to FERC on the Santeehlah
Six Periodic Inspection Report regarding shcar strcngth
of the concrete to rock contact. Provided review for the
SHAW ENVIRONMENTAL, INC.
06C122006T
calculation to ree\'aluate the stability of rock \vedges at
Cheaoh of the co dam for revised flood conditions in
response to FERC comments on the Six Periodic
Inspection Report.
Geotechnical Consultant, The Independent Spent
Fuel Storage Installation, Maine Yankee Atomic
Power Company, Wiscasset, ME, 01/1999 - 06/2001.
As Gcotechnical Consultant, performed adequacy review
for site investigation, formulated laboratory soil testing
program, interpreted soil strength and compressibility
parameters for bearing capacity and scttlemcnt
calculations. Performed technical rc\'icws of bearing
capacity and scttlement calculations, gcotechnical
investigation report and geotechnical design criteria.
Geotechnical Consultant, Rail Spur - Big Brown
Steam Electric Station, TXU Electric, Fairfie[d, TX,
03/1997 -10/2000. As Gcotechnical Consultant,
pro\'ided technical input and revie\v for the design of
soil nailing walls, test pile program, soillatcralmovcmcnt
and pile response due to coal pile surcharge, tubular
gabions, slope protection design, earth pressurcs of
rctaining structurcs and underdrain design for
construction of the 23 mile rail spur and associated
facilities.
Geotechnical Consultant, Chilhowee Dam
Subsidence Investigation, Tapoco, Inc., TN,
03/2000 - 06/2000. As Geotechnical Consultant,
pro\'ided input to conduct a field il1\'estigation on the
left abutment embankment section after a local area of
subsidence was reportcd. Borings werc conductcd to
dctcrminc any matcrial deformation. A report was
prcpared for FERC regarding the finding.
Geotechnical Consultant, Mystic Station Betterment
Project, Sithe Mystic Development L.L.c., Everett,
MA, 03/1999 - 06/2000. i\S Gcotechnical Consultant,
provided pile foundation design for supporting the
wastewater tanks, firc pumphouse, water tanks and pipe
supports. Performed technical reviews for the pile
installation spccification and geotechnical design critcria
for the bettermcnt facilities.
THOMAS Y. CHANG 4
.
...i
<(
[f)
a
"-
a
Ct:
"-
[f)
I
I-
"-
a
w
<!J
<(
"-
':J
l-
t=:
w
I
I-
Z
a
z
a
t=:
'-'
ii:
I-
[f)
W
Ct:
W
I
I-
a
.~
::J
[f)
~
I-
W
W
I
[f)
[f)
I
I-
Z
a
o
w
z
q'
I-
Z
a
'-'
<(
I-
<(
o
"-
a
w
Ct:
::J
[f)
g
'-'
[f)
o
Ct:
a
w
[f)
::J
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Kenneth A. Cunningham, P.G.
Education
Completed t\laster's of Geology Course \Vork, Eastern
Kentucky U ni\"ersity
B.S., Geology, Tennessee Technological University, 1982
Reg istrations
Registered Professional Geologist: FL, GA, TN
Background Summary
t\Ir. Cunningham's expertisc includes program, project,
and task management for small and large groundwater
and soil invcstigations and remedial sites for both
commercial and gm'ernment clients. He is experienced
in all phases of contamination assessmcnts for
hazardous and non-hazardous wastc facilities, Phase I
and II environmental audits for property transactions,
remedial and correcti\"e action plans, tank closure
assessments, remcdial systcm installation, system
operation and maintenance, and natural attcnuation
plans. He has completed more than 200 im"estigations
in Florida, Georgia, South Carolina, Tcnnessce, and
\,\'est Virginia. t\[r. Cunningham is also experienced in
shallow and deep drilling practices. He currently seLTes
as thc Im"estigatiH Task t\[anager for DOD projects in
West Virginia, Florida, and Puerto Rico managed by the
Knoxvillc office. He also seLTes as Project ]\[anager
UST sites in Tenncssee under acti\"e soil and
groundwater remediation. Because of his professional
achievements, Mr. Cunningham has been named a
Project t\Ianagement Associatc.
Relevant Experience
1999 - Present, Project Manager, Shaw
Environmental & Infrastructure, Inc.
t\Ir. Cunningham currently serves as the Project Manager
for twelve UST sites in Tennessee for a retail client. Site
management includes scheduling and cost control, cost
proposal preparation, field work, managing field
personnel, communication with subcontractors, the
client, and regulatory agencies, and report preparation.
Thc sites are all in various stages of activc remediation or
monitoring for soil and groundwater contamination.
SHAW ENVIRONMENTAL, INC.
06C122006T
1999 - Present, I nvestigative Task
Manager, Formerly Used Defense Sites
(FUDS) for the U.S. Army Corps of
Engineers
Mr. Cunningham currcntly SetTCS as the Investigati\"e
Task Manager for four formerly used defense sites
(FUDS) for the U.S. Army Corps of Engineers. He
manages all aspects of investigative work at the four sites
including work plan preparation, scheduling, cost
proposal preparation, field work, managing field
personnel, communication with subcontractors, client
and regulatory agencies, and report preparation.
Developed low tlow groundwater sampling protocol for
use at sites in Florida and Puerto Rico. He also
participates in Tier I and project team meetings between
Shaw, the client, and regulatory agencies. Responsible
for investigative work invoh"ing contaminants including
VOCs, SVOCs, metals, and explosi\"es.
1988 - 1999, Project Manager/Office
Manager, Shaw Environmental &
Infrastructure, Inc.
t\Ir. Cunningham seLTed as Project t\Ianager and Office
]\Ianager for three IT COLvoration offices in Florida. He
was responsible for all aspects of management of
commercial and state government projects ranging from
assessment through remediation sites. As office
manager was responsible for managemcnt of projects,
resources, business development with new and existing
clients, proposal preparation, office profit and loss,
business forecasting, health and safety, and tracking
reccivables.
Other experience includes:
Program Manager/Project Manager, FDEP Site
Investigation Section, Florida Zone 3. Rcsponsible
for overall program and contract management for tasks
assigned under this contract. The work involved
multiple sites and tasks for the South Florida area and
included: contamination assessments for hazardous and
non-hazardous waste sites, site access negotiations for
adjacent impacted properties, and identification of
potentially responsible parties. The work involved all
activities associated with soil and groundwater
investigations including drilling, geoprobe, soil gas
surveys, various media sampling, and analysis.
Contaminant types encountered included: petroleum
KENNETH A. CUNNINGHAM, P.G.
e
-'
<(
<f)
o
"-
o
Q:
"-
<f)
I
I-
U.
o
w
(!)
<(
"-
":J
I-
>=
W
I
I-
Z
o
Z
o
>=
CJ
'"
I-
<f)
W
Q:
W
I
I-
o
I-
ei
<f)
~
I-
W
W
I
<f)
<f)
I
I-
Z
o
o
w
z
4'
I-
Z
o
CJ
<(
I-
<(
o
u.
o
W
Q:
::>
<f)
g
CJ
<f)
o
Q:
o
W
<f)
::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
hydrocarbons, chlorinated solvents, mctals, dioxins, and
furans. In addition, Mr. Cunningham rcviewed all
submittals, prepared work scopes and cost estimates,
and interfaced \vith the client and regulatory agencics.
Program Manager/Project Manager, DERM-04
Contract, FL. SetTed as local contact responsible for
program and contract management. \\Tork types
involved construction and remediation projects
including landfill capping, construction of a compressed
natural gas facility, construction of a utility corridor and
soil excantion project at the Miami International
i\irport, and removal of an underground storage tank
and installation of an aboveground fuel system at the
South Dade County Landfill.
Program Manager/Project Manager, U.S. Postal
Service, Florida Statewide AE Contract. Responsible
for program and contract managemcnt of this
cm'ironmental set'\.ices contract. This work included
multiple sites and tasks throughout Florida. Typical
work scopes included: Phase [ and [[ environmcntal
property transfer audits for proposed postal facility
locations, lead and asbcstos sut'\.cys, wetland SU1TCYS and
mitigation, and cncrgy rcduction Sllt'\'CyS. [n addition,
0.[r. Cunningham rc\.iewed all submittals, preparcd work
scopes and cost estimates, and interfaced with the client
and regulatory agencies.
Project Manager/Hydrogeologist, Chemical
Spraying Site, Palm Beach County, FL. c..[anaged
and prm'ided on-site coordination for a rapid response
soil and groundwater investigation il1\'olving dioxins,
furans, metals, and hydrocarbons. \Vork included
multiple well and boring installations and soil and
groundwater sampling activities conductcd in Lcvel 13
and C personal protective equipment. Follow-up work
im'olved preparation of an asscssment rcport for usc by
the regulatory agency for consent order negotiations.
Project Manager/Hydrogeologist, Convenience
Store Chain, FL and GA. Responsiblc for ovcrall
contract, project, and program management for over 200
facilities in Florida and Georgia. \'Cork types im'olvcd:
UST contamination assessments, rcmcdial action plans,
cmergency response to spills, remediation system
installation, system operation and maintenance,
monitoring only plans, aquifer testing and intcrpretation,
NPDES permitting, bioassay testing, discharge
monitoring and reporting, correcti\'e action plans,
compliance audits, toxicity reduction e\'aluations, and
Phase I and II audits. [n addition, 0.[r. Cunningham
rc\.ie\vcd all submittals, prepared work scopcs and cost
estimates, and interfaced with the client and regulatory
agencies.
SHAW ENVIRONMENTAL. INC.
2
KENNETH A. CUNNINGHAM, P.G.
06C 122006T
.
.J
..
(/J
o
a.
o
'"
a.
(/J
I
>-
u.
o
w
"
..
a.
~
>-
;::
W
I
>-
Z
o
Z
o
;::
u
ii'
>-
(/J
W
'"
w
I
>-
o
>-
.~
(/J
!!1
>-
w
W
I
(/J
(/J
I
>-
z
o
o
w
Z
;;:
>-
z
o
u
..
>-
..
o
u.
o
w
'"
OJ
(/J
g
u
(/J
o
'"
o
w
(/J
OJ
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Michael J. Davidson, P.E.
Education
I\LS., Civil Engineering, Uni\'ersity of Rhode Island,
1971
B.S., Ci\'il Engineering, University of Rhode Island, 1968
Registrations
Professional Engineer: Ci\'il, 1\IA, Rl
Background Summary
l\[r. Da\'idson has m'er 39 years of diversified
professional engineering and supervising experience. He
has performed, supervised, and coordinated various
aspects of civil-structural design for major utility,
industrial, and infrastructure projects. In addition, he
has experience in project management, project
administration, client liaison, subcontractor/\'endor
monitoring and coordination, and construction liaison.
For the past 18 years, he has been assigned to the
Transportation/Infrastructurc Di\'ision where he
functions as Projcct l\Ianager/Lcad Structural Engineer
on a number of assignments, which include bridge
design, bridgc rating, bridge type studies, and bridge
inspections. l\Ir. Da\'idson was the Project Engineer for
the structural inspection of the historic Longfellow
Bridge, which spans the Charles Rinr betwccn Boston
and Cambridge, l\Iassachusetts. He performed the
rating of the French King Bridge, w'hich carries Routc 2
m'er the Connecticut Ri\'er. He supervised and
participated in the design of 26 city roads and ramp
bridges associated with the DU09C contract of the
Central Artery Project. [n addition, l\lr. Davidson
directed the preliminary structural engineering associated
with the proposed transitway between Sleeper Street and
the \\'orld Trade Center in South Boston. Hc was the
lead structural/bridge engineer for the design of 12
railroad bridges and trestles on a 26-mile railroad spur in
Texas. He has been the Project l\Ianager for three
footbridge bridge contracts and one bridge-rating
contract for the 1\Iassachusetts Highway Department. In
addition to his bridge experience, Mr. Davidson has
functioned as lead structural engineer and/ or project
engineer in the CNG conversion of three bus
maintenance facilities and the upgrade of one
I SHAW ENVIRONMENTAL, INC.
06C122006T
maintenance facility to selyice a new bus fleet, project
manager for an acidic wastcwater surge tank for the
United States Army Corps of Engineers, and structural
ad,'isor in the performance of small projects, studies,
and proposals.
He has bcen Design Supervisor on a number of power
projects, including conceptual projects and feasibility
studies. He was the Assistant Lead Structural Engineer
on a lignite-fired power plant project, responsible for the
coordination of the engineering and design of the power
block structures and the supervision of a $50 million
structural s tcel contract.
I\lr. Davidson has performed hundreds of structures and
structure systems inspections. l\[ostly, the inspections
have cstablished the pre-existing condition of the
structures and adjacent facilities prior to construction
through reports or audio-visual SUlyey. However, Mr.
Davidson has also identificd the causes of structural
failures and supplied expert testimony.
Relevant Experience
02/1973 - Present, Project
Manager/Project Engineer, Shaw
Environmental & Infrastructure, Inc.
Over the past I () years, has supelyised the design of
morc than SO bridges, ranging from entireh' new
structures in complex urban interchanges to repair and
rehabilitation of simple and complex existing structures
crossing waterways, roadways, and railroads.
Experienced in CNG com'ersions of bus maintenance
facilities, wastewater systems, and a wide variety of other
structural design issues. Experience includes project
management and administration, client liaison, and
subcontractor monitoring and coordination. Provides
technical direction and quality assurance in the
performance of small projects. Also, provides structural
support for studies and proposals.
MICHAEL J. DAVIDSON 1:=2]
.
-'
<(
m
o
0-
o
'"
0-
m
I
>-
u.
o
w
19
<(
0-
~
>-
>=
w
I
>-
Z
o
z
o
>=
o
ii'
>-
m
w
'"
W
I
>-
o
>-
.~
m
~
>-
w
w
I
m
m
I
>-
z
o
o
w
z
<i
>-
z
o
o
<(
>-
<(
o
u.
o
w
'"
::)
m
g
o
m
6
'"
o
w
m
::)
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
The following is a summary of key projects:
Lead Structural Engineer/Proje<;t Engineer, CNG
Bus Maintenance Facilities Conversions,
Massachusetts Bay Transportation Authority
(MBTA), MA, 06/2002 - Present. Lead Structural
Engincer and/ or Project Enginccr in thc cOl1\'crsion of
three existing bus maintenance facilities for use by CNG
buses. The work included the addition of a gas
detection system, emergcncy vcntilation system, and
upgrading of the bus maintenance equipment/systems.
Also, provided technical guidance for the construction
of CNG fueling stations for the buses. The facilities
includcd:
Cabot Bus Repair Facility, Interim Arborway
t\Iaintcnancc Facility and Enrctt Hea\'y Bus Rcpair
Facility: ;\s Project Engineer, coordinated Shaw\Stonc
& \Vebster's portion of the conversion of these facility
to CNG and performcd othcr functional space upgrades.
Tasks associatcd with this assignmcnt includcd liaison
with clicnt, statc, and local officials and other members
of the design tcam. [\ssisted in the preparation of
industrial layout drawings and specifications to includc
bus \vashcr/ reclaim systems, lubrication s:'stcms,
compressed air systcms, bus lifts (in-ground rctrofittcd,
dri\"e-on, and mobilc), part storage, bus top fall
protection, cranes and hoists, tluid monitoring systcms,
tluid management systcms, paint booths, engine
transmission and chassis dynos, and fiberglass shops. As
Lead Structural Engineer, inspccted, e\'aluated, and
prepared contract documents for the conversion of
these facilities to CNG. Work includcd concrete
demolition, repair, and design as well as selection of
coatings for concrete tloor slabs, design of a bus top fall
protection system, evaluation of ncw openings and loads
for rooftop equipment, evaluation of the siting of an
emergency generator on an elevated floor slab, extension
of an existing paint booth to includc downdraft pit, and
the preparation of specifications and construction
es tlma tes.
Principal Structural Engineer, Great River Energy,
SO, 12/2003 - 06/2005. Provided technical direction in
thc inspection, load rating, and rchabilitation of a 12-
span, approximately 365-foot-long, stcel coal unloading
structure. The inspection included the non-destructive
testing of fatigue prone details. The rehabilitation
SHAW ENVIRONMENTAL, INC.
06e 122006 T
consisted of upgrading the structure for the latest
AREl\L-\ t\lanual requircments for longitudinal loads,
the replacement of damaged and/or deteriorated
members, and the rcplacement of fatigue prone details in
high strcss areas.
United States Army Corps of Engineers (10/2001-
Present): Project t\Ianager and lead Civil/Structural
Engineer for the design of an acidic wastewater by-pass
system to a 500,000-gallon concrete surge tank. The
design included the evaluation and selection of materials
with the potential of acidic \vastewater with a pH less
than 2. The contract spccifications \vere prcpared using
Specs[ntact.
TUElectric/Texas DOT, Rail Spur Planning,
Design and Construction (11/1996 - Present): Lead
Structural Engineer responsible for the design of three
railroad bridges, nine railroad trestles, and other
structurcs associatcd with thc new 26-mile rail spur.
These structurcs includc ballastcd-dcck through-girder
bridges totaling morc than 700 feet in length. The
largest span is 135 fect long using a lO-foot-deep girder
wcighing about 75 tons. [\dditional structures include
ballastcd-dcck trestlcs with twin precast prestresscd
concrete boxes comprising thc superstructurc. Thc
trestles, uscd in wetland and lowland terrain, ha\'e 28- to
30-foot-long spans and a substructure of prccast picr
caps supportcd by HP piles. The trestle spans total
more than 1.+00 feet. ,\Iso responsible for the design of
a soil nail wall that allowcd for an economical grade-
scparation crossing of an interstate higlnvay. Design
re(luired cxtcnsi\'e coordination with the Texas
Department of Transportation for highway crossings,
and Burlington Northern-Santa Fe and Union Pacific
Railroads from railroad crossings.
Massachusetts Highway Department, Footprint
Bridge Program (10/1995 to Present): As Project
Manager for the reconstruction of two bridges, is
responsible for maintaining project schedule and quality,
performance of the design team within the established
budget, overseeing investigations to determine bridge
structural condition, and dcveloping plans to replace or
repair the bridges.
I. Route 122 Bridge over Millers River, Orange, t\L-\ -
Replacement of a 2-span I-girder superstructure,
repair of the concrete substnlcture, and
MICHAEL J. DAVIDSON
2
e
-'
<(
(j)
o
a.
o
0:
a.
(j)
I
>-
u.
o
UJ
'-'
<(
a.
~
>-
>=
UJ
I
>-
Z
a
z
a
>=
u
ii:
>-
(j)
UJ
0:
W
I
>-
a
>-
ei
(j)
<!.1
>-
UJ
UJ
I
(j)
(j)
I
>-
z
a
o
UJ
z
;:c
>-
z
a
u
<(
>-
<(
o
u.
a
UJ
0:
=>
(j)
g
u
(j)
o
0:
a
UJ
(j)
=>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
modifications to the super- and substructures to
seismically upgrade the bridge to meet the
requirements of the latest AASHTO Bridge
Specification.
2. Cross Street Bridge, SomelTille, t\IA - Preparation of
plans and specifications to replace the superstructure
and rehabilitate the substructure of this lI5-foot-
long structure crossing active railroad lines in an
urban environment. The project includes
preliminary engineering, highway design, bridge type
studies and sketch plans, and final design.
Massachusetts Highway Department, 1-90/1-93
Project, Section D009C (11/1993 - 10/1996): Task
Lead supervising design of 26 bridges incorporated
\vithin the section of the Central Artery/Tunnel project
at the 1-90/[-93 Interchange, Southbound, at
t\[assachusetts .r\\'enue. Bridge superstructure types
include steel and concrete boxes, clllTed horizontal 1-
beams, precast prestressed concrete butted boxes, and
precast prestressed concrete bulb tees. The work also
includes the underpinning of t\vo existing bridges and
the de\'elopment of slab on pile transition structures to
some of the bridgcs. I\ll bridges are designed for HS20
or HS25 loading and seismic forces. Computer
programs used include BRASS, BSDI, STARDYNE,
and STA,\D III.
SupelTised and participated in the design of the
substructurc of the Interim Viaduct at ,\lbany Street
([V.\S), a 20-span, approximately l800-foot-long
temporary \'iaduct. The IV I\S design was accomplished
in a lO-week accelerated design schedule. The
substructure satisfies several space constraints, to meet
the concerns of the City of Boston Transportation
Department and abutters. Special design details were
dc\'eloped to mcet minimum sidewalk widths of 8 fcet
and the required roadway width for Albany Street traffic.
These details included tapered columns and small-
diameter steel pipe piles. This section of the project was
opened to traffic in August 1997 and will carry traffic
until 2002 rather than the initial l8-month plan.
Contractor claims amounted to less than 10;;) of the
construction budget of S 12 million.
Massachusetts Highway Department, Complex
Bridge Rating On-Call Services Contract (01/1992 -
10/1992): Lead Bridge Engineer in thc rating of the
French King Bridge, which carries Route 2 over the
Connecticut Ri\'er bet\veen Gill and ElTing, t\L-\. This is
a three-span, continuous spandrel truss bridgc
approximately 900 feet long. Responsibilities included
dc\'eloping a live-load distribution and membcr propcrty
program, as well as the manual and computerized rating
of the slab, stringers, floor beams, and truss members of
this bridge for standard A..\SHTO and t\Iassachusetts-
specific truck loads. The computer analysis programs
used include STRUDL, BRI\SS, and Bi\R7. Directed a
team that performed ratings of bridges of various
structural types and complexities under the ovcrall
con tract.
Metropolitan District Commission, Longfellow
Bridge Restoration (04/1988 - 12/1988): As Project
Engineer, directed the multi-company inspection and
rating of this l800-foot-Iong, ll-ribbed-arch-span bridge
over the Charles River, for which Stone & \,\'ebster
completed and filed a report in 1988. SupelTised
inspectors performing \'isual, close-range inspection of
bridge, supplemented when necessary by NDT. \,\'ork
im'olYed the use of a barge with articulating personnel
lifts. Dirccted preparation of the condition assessment,
bridge rating report, and cost estimates to rehabilitate
this his toric landmark. l\ [ore than 10,000 structural steel
members were inspected.
SHAW ENVIRONMENTAL. INC.
MICHAEL J. DAVIDSON 3
06C122006T
e
.j
<{
<f)
o
a.
o
0:
a.
<f)
I
>-
W-
o
w
"
<{
a.
~
>-
;::
W
I
>-
Z
o
Z
o
;::
u
ir
>-
<f)
W
0:
W
I
>-
o
>-
ei
<f)
'!1
>-
w
W
I
<f)
<f)
I
>-
z
o
o
w
z
4:
>-
z
o
u
<{
>-
<{
o
W-
o
w
0:
::::>
<f)
o
--'
u
<f)
Ci
0:
o
w
<f)
::::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Greg Dever, P.E.
Why Selected as Key Personnel for Contract
. Served as Project Manager on several FL
wetland reclamation and stormwater projects
. 20 years experience in the engineering design and
project management for environmental remediation
projects
Education
B.S., Ciyil Engineering, Uni\'ersity of [\rizona; 1982
Registrations
Professional Engineer: rL, GA, SC
Background Summary
t\[r. De\'er joined Shaw Elwironmental, Inc., in 1993
with fi\'e years of experience in engincering design and
project management for el1\'ironmental rcmediation
projects. He has participatcd in asscssment acti\'ities,
engineering design, remedial action system operation
O\'crsight, amI O\'erall project management for numerous
petroleum-contaminarion and hazardous wastc sites as
well as for commercial and public \vorks projects.
Extensiye system installations and remedial design
reports haye de\'eloped his expertise in el1\'ironmental
construction techni(lues.
Relevant Experience
1993 - Present, Engineering Manager,
Shaw Environmental, Inc., Clermont, FL
Project Engineer, Gulf Coast Recycling, Wetland
Reclamation Project, Tampa. PrO\'ided design and
construction setyices for a pre-fabricated concrete weir
structure for installation in wetland area after battery
materials had been remO\'ed and stabilized. Design
services included hydraulic analysis for wetlands le\,el
and weir sizing during storm eyents. \X'eir design
included structural detailing and specifications for
fabrication of weir structure. Field scrvices included
oyersight of weir placement and suryey for as-built
completion report in accordance with U.S. [\rmy Corps
of Engineers project requirements.
Project Manager Duval Street Bridge Demolition,
Jacksonville. Prepared and implemented demolition
I SHAW ENVIRONMENTAL, INC.
06C122006T
plan for a 900-ft long concrete bridge (\'iaduct) oyer a
creek bed in downtown Jacksonville. The work
elements included concrete demolition, separation of
rebar for recycling, materials handling, trucking,
\'ibration monitoring of a 3-story historic brick building
located G feet from the bridge, installation of
underground concrete drainage piping, construction
suryeying, supetyision of backfilling and compaction.
Project Manager; Storm water Pond Desilting and
Outfall Structure Design, St Augustine. Prepared
and implemented drainage pond desilting plan for
remO\'al of I,SOO cubic yards from a 2 acre stormwater
pond. Plan included design and specifications for
construction of a new outfall drainage structure meeting
the requirements of the SJR\X?\[D. Field duties included
O\'ersight of pond dewatering, exca\'ation of silt material,
construction sutTeying, and engineering inspection of
drainage structurc cons truction.
Project Manager; FDOT District 1, Southwest FL.
t\[ultiple Storm Se\ver Installations. PrO\'ided
management and construction setTices for installation of
multiple storm drain s~'stems including drainage
structures and reinforced concrete pipe up to GO-inch
diametcr through contaminated areas. Desit,J11 sC1Tices
includcd treatment system design and installation to
support treatment of contaminated groundwater for
discharge under a NPDES permit.
Project Manager for Orange County Risk
Management Contract. Prm'ided continuing
professional sen'ices for em'ironmental site assessment
and remediation projects.
Contract Manager; FDOT District 2. Responsible
for the program and contract management of the
enyironmental services contract for this FOOT district.
This work includes multiple sites throughout the district
for UST remonls; Le\,el I and II investigations;
contamination assessments; and remediation design
implementation, including bioremediation, drum
removals, and hazardous and non-hazardous waste
disposal.
Project Manager/Project Engineer; Petro Chemical
Products Inc. The project was a RClV\ Correctiye
Action Site located in Jacksonville, Florida, and involved
contaminated soil and groundwater from chlorinated
GREG DEVER, PE Q
.
~
<(
UJ
o
0-
o
a:
0-
UJ
I
t-
"'-
o
w
"
<(
0-
W
..J
t-
;::
W
I
t-
Z
o
Z
o
;::
u
0::
t-
UJ
W
a:
w
I
t-
O
t-
.~
UJ
!Q
t-
W
W
I
UJ
UJ
I
t-
Z
o
o
w
z
;;:
t-
Z
o
u
<(
t-
<(
o
"'-
o
w
a:
~
UJ
g
U
UJ
o
a:
o
w
UJ
~
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
solvents. Mr. De\'er's engineering responsibilities
included pilot testing and design of the soil and
groundwater corrective action system. I\Ir. Dever's
project management responsibilities included oversight
of the system installation and operation, including
subcontractors. The Correcti\'e i\ction Plan (Cf\P) was
reviewed by the FDEP Hazardous \'\'aste Section. The
regulators and reviewers had such confidence in the
design by OHI\I that they granted permission to
construct and operate the system prior to the CAP
review. The CAP was subsequently reviewed and
appro\'ed by the FDEP without any comments.
1987 - 1992, Project Manager/Project
Engineer, Burns and Roe Environmental,
Orlando, FL
Designed, managed, and installed public \vorks projects
including large sanitary se\ver lift stations (3 million
gallons-per-day capacity); sanitary force mains up to 24-
inches in diameter; minor roadways; stormwater drainage
systems including retention ponds, drainage pipe, and
drainage stmctures; and potable water systems including
production wells, booster stations, storage tanks, and
pipe lines.
Project Manager/Engineer, Orange County Florida
Public Works Flood Control Design Project, Lake
George, Orlando. An historic drainwell for this lake
had failed and the lake b'd had risen dramatically and
was threatening surrounding property mvners. Sen'ices
included hydrologic analyses and historic hydric species
analyses for determining historical lake levels. Data was
then used to design a pump station for flood control of
lake to replace the failed draimvell. Design services
included site sun'eys, hydraulic analyses, pump design
and selection, stilling \vell sizing and analyses, drawing
and construction specification preparation, construction
cost estimate, and bid document preparation.
Project Manager/Engineer, Stormwater Design,
Multiple Projects. Sen'ices included site sun'eys, storm
sewer design, hydraulic analyses, stonn\vater
retention/ detention pond design, hydrograph and pond
routing modeling, drawing and construction
specification preparation, cost estimate preparation, fidd
engineering oversight, and as-built documentation.
1982 - 1987, Nuclear Engineering Officer,
U.S. Navy
Operations and maintenance of weapons and propulsion
systems onboard a nuclear-powered submarine.
06C122006T
GREG DEVER, P.E. D
I SHAW ENVIRONMENTAL, INC.
.
--'
<(
(j)
o
0-
o
'"
0-
(j)
I
I-
"'-
o
w
<!l
<(
0-
W
--'
I-
>=
W
:r:
I-
z
o
z
o
>=
u
ii'
I-
(j)
W
'"
w
:r:
I-
o
.~
=>
(j)
~
I-
W
W
:r:
(j)
(j)
I
I-
Z
o
o
w
z
;;'
I-
Z
o
u
<(
I-
<(
o
"'-
o
w
'"
=>
(j)
g
u
(j)
Ci
'"
o
w
(j)
=>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Steven T. Downey, P.E.
Why Selected as Key Personnel for Contract
. Over 30 years Project Management
Experience on Civil and Structural Design
projects
. Safety Management Fixed-Price Task Order
contracts within Budget and Schedule
Education
B.E., Ci,'il/Structural Engineering, Vanderbilt, 1977
Registrations
Professional Engincer: Ci,'il, SC, TN, FL: Pending
Contractor: AI" HI, r.[S, TN
Lead Related SupelTisor, 2003, LSP[-2203, Active,
Natiomvide, OS/2008
,\sbestos Abatement Site Supen'isor, 2003, 108395,
!\cti,'e, Nationwide, 07/2007
.\sbestos Building [nspcctor, 200-+, 1120-1-5, ,-\cti,'e,
Nationwide, 07 !2007
!\sbcstos [\ lanagemcnt Planner, 200-1-, 1120-1--1-, Acti'T,
Nationwide, 07/2007
Background Summary
Mr. Downey is a registercd profcssional engineer (SC,
TN, and FL-pending) and licensed contractor (IN, ,\1.,
r.[S, and H[) with more than 29 ycars of design,
construction, projcct controls, and senior project
management experience at Dcpartment of Energy
(DOE), Department of Defense (DOD), and
commercial facilities nationwide. 0.[1'. Downey is listcd
in the National Registcr of \'\11O's W110 in Executives
and Professionals, 2005-200G. His managcmcnt
expertise includes sitc im'estigation, design, construction,
startup, and operation. Mr. Downey's design experience
includes hands on structural design utilizing hand
calculations and finite element computer analyses as well
as management of large design projects where he
managed as many as GO multidiscipline design
professionals. His construction cxperiencc includes
management of structural system installatiol1s at nuclear
power plants, waste processing facilities, storage vaults,
levces, earthen basins and treatment facilities. Mr.
I SHAW ENVIRONMENTAL, INC.
06C122006T
Downcy has managed projects ,'alued as high as S 1 00
million. Mr. Downcy possesses a thorough knowledge
of cost and schedule control systems, and is familiar with
RCR,-\ and CERCL-\ regulations. His elwironmcl1tal
expericnce includes thrce years in high-Ie,'el radioactive
waste managemcnt and ten years in cm'ironmental
remediation ilwoking radioactive and hazardous
contamination and !\IEC a,'oidancc. !\[r. Downev is also
certificd as an Asbestos Abatement Supervisor, Lead
Abatement Supen'isor, Asbestos Inspector, and
Asbestos !\Ianagement Planner.
Relevant Experience
07/2000 - Present, Senior Project
Manager, Shaw Environmental &
Infrastructure, Inc.
Responsibilities include O\'erall project management and
supervision of project staff. !\[r. Downey is responsible
for successful cxecution of projccts within cost and
schedule budgets. He is also responsible for O\'erall
project safcty and (juality. Othcr rcsponsibilitics include
interfacing with client and regulator personnel as well as
reporting project status to clicnt and internal
management.
The following is a summary of key projects:
Project Manager, Plum Brook Ordnance Works
(PBOW), various task orders, USACE - Nashville
District, Sandusky, OH, OS/2002 - Present.
!\ lanaged 7 negotiated fixed-price task orders for the
PBO\\' site under this l\rchitectural and Engineering
SelTices IDIQ contract. Thesc projects included site
im'cstigations, groundwater fatc and transport modeling,
risk assessments, and preparation of Dccision
Document, Fcasibility Study, and Proposed Plan
documents. !\Ir. Downey also participates in Restoration
Advisory Board (IL\I3) meetings for this site.
:\ wards/ Clicnt Commendations:
President's Safety A ward for 2,000 days worked without
a lost timc accidcnt.
Senior Project Manager, West Virginia Ordnance
Works (WVOW), various task orders, USACE -
Nashville District, Point Pleasant, WV, OS/2002-
Present. !\Ianaged 19 negotiated fixed-price task orders
for the \WOW site under this Architectural and
STEVEN T. DOWNEY Q
.
.J
<i
(/)
a
"-
a
0:
"-
(/)
I
>-
u.
a
w
'"
<i
"-
~
>-
>=
W
:I:
>-
Z
a
z
a
>=
u
ii:'
>-
(/)
w
0:
w
:I:
>-
a
.~
OJ
(/)
'!2
>-
w
W
:I:
(/)
(/)
I
>-
z
a
o
w
Z
;;'
>-
z
a
u
<i
>-
<i
o
u.
o
W
0:
OJ
(/)
g
u
(/)
6
0:
a
w
(/)
OJ
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Engineering SelTices [DIQ contract. A partnering team
was established in 2002 for addressing issues related to
restoration and closure of this NPL site. The partnering
tcam is comprised of rcprcscntativcs of the Nashville
and Huntington Districts of the USACE, Region 3 EP i\,
and the State of \'(V. 1\[r. Dmvne\' was namcd a
consensus membcr of this team gi\'ing him decision-
making authority for actions at this site. These projects
included site im'cstigations, groundwater fate and
transport modeling, risk assessments, treatability studies,
and preparation of Decision Documents, Feasibility
Studies, Proposed Plans, and Record of Decision
documents.
Accomplishments:
Delisted over 1,500 acres of this 2,700 NPL sitc.
Through partnering with client and regulator personnel,
Shaw effected cost savings totaling an cstimated
S 1,100,000. [\[r. Downey authored a paper cntitlcd [n
Situ Enhanced Bioremediation to Treat Nitroaromatics
in Groundwater that \vas published in the Federal
Facilities Environmental J oumal, Spring 2005 issue. He
also prescnted this topic at the 200-1- EPi\ Site
Optimization confercncc in Dallas, the 200-1- Joint
SelTiccs Em'ironmcntali\[anagcment confcrcnce in San
Antonio, and the 2005 Em'ironmcntal Tcchnology
Symposium and \Vorkshop in Portland, OR.
A wards/ Client Commendations:
President's Safety i\ ward for 2,000 days worked \vithout
a lost time accidcnt.
Received letter of commendation from John Hall,
USACE - Nasln'illc District.
Senior Project Manager, P14 Levee Repairs, US
Army Corps of Engineers (USACE) - New Orleans
District, Plaquemines Parish, LA, 01/2006-
06/2006. Execute repairs to 4.85 miles of l\ussissippi
Ri,'er west bank levee system follmving hurricane
Katrina. Project included borrow pit development and
operation; processing, hauling and placing compacted
and un-compacted fill; placement of stone for scour
resistance; placement of rip rap; and fertilizing, seeding,
and mulching.
Accomplishments:
SHAW ENVIRONMENTAL, INC.
06C 122006 T
During construction, a rotational failure occurred due to
w'eaker underlying soil conditions than accounted for in
the USACE design. Shaw was able to respond within
hours providing additional labor and cquipment
rcsources. Critical protection was restorcd within 13
days: the US.\CE estimate \vas 2-3 months.
Civil/Structural Engineer, FEMA ITAC Contract,
New Orleans, LA, 09/2005 -12/2005. Performed
damage assessments of hotels in downtown New
Orleans after hurricane Katrina to determine suitability
for habitation. Also conducted raw land assessments
and dc\'eloped detailcd cost estimatcs for de\"cloping
temporary group housing sitcs.
Senior Project Manager, Sangamon Ordnance
Works, US Army Corps of Engineers (USACE) -
Louisville District, Illiopolis, IL, 06/2001- 04/2006.
Locate and remove underground storage tanks and
associated piping at the former Sangamon Ordnance
Plant.
i\ccomplishments:
Completed geophysical im-cstigations, cxploratory
cxca\'ations and remo\'ed underground storagc tanks
that were disco\"ercd. Also remm-cd and disposed of
approximately 5,000 tons of pctrolcum-impactcd soil.
Project Manager, Portsmouth Quad I, Bechtel-
Jacobs, Piketon, OH, 08/2000 - OS/2002. This was a
design-build project at the Portsmouth Gaseous
Diffusion Plant near Pikcton, 0 H which included:
. Design and construction of two RCIL\ caps
(approximately 2-acres each)
. Design and construction of a groundwater extraction
and collection system consisting of 11 extraction
wells and approximately 5,000 feet of collection
plpll1g
. Design and construction of a 1200 linear foot slurry
wall around an existing mixed waste landfill
06/1997 - 07/2000, Senior Project
Manager, Shaw Environmental &
Infrastructure, Inc, Honolulu, HI
Rcsponsibilities included overall project managcment
and supervision of project staff. !\Ir. Downey was
rcsponsible for successful execution of projects within
cost and schedule budgets. He was also responsible for
STEVEN T. DOWNEY
2
.
..;
<(
if)
o
0-
o
'"
0-
if)
I
t-
u.
o
UJ
"
<(
0-
~
t-
;::
UJ
I
t-
Z
o
Z
o
;::
u
ii2
t-
if)
UJ
'"
UJ
I
t-
O
t-
.~
:J
if)
'!?
t-
UJ
UJ
I
if)
if)
I
t-
Z
o
o
UJ
z
;;'
t-
Z
o
u
<(
t-
<(
o
u.
o
UJ
'"
:J
if)
g
u
if)
o
'"
o
UJ
if)
:J
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
m'erall project safety and quality. Other responsibilities
included interfacing with client and regulator personnel
as well as reporting project status to client and internal
management.
The following is a summary of key projects:
Senior Project Manager, Wake Island POL, Pacific
Division Naval Facilities Engineering Command,
Wake Island, 03/1998 - 06/2000. This was a cost plus
award fee [DIQ project to remove and dispose of 34
underground storage tanks and approximately 5,000 feet
of abandoned fuel pipeline. The project also included
demolition and recycling of one 115,000 gallon above
ground storage tank and removal of metal debris from
the shoreline of the island. To facilitate access to an
adjacent island of this atoll, [T (Shaw) also designed and
implemented structural upgrades to an existing wooden
bridge to support the weight of construction equipment.
Soil borings for site characterization \vere added ,'ia a
modification. Successful execution of this project
required extensi,'c planning and coordination as all
re(luired materials and equipment were procured and
transported from California and Hawaii ,'ia barge. \,\'ake
[sland is a small (approximately :2 s(juare miles in area)
remote island located approximately :2,:20U miles from
Honolulu, HI.
[\ccomplishments:
All 34 underground storage tanks were rem()\'cd,
cleaned, and recycled. The 115,000 gallon ab()\'e ground
storage tank and approximately 5,000 feet of pipelinc
\vere removed, cleaned, and recycled. Approximately 15
tons of metal debris \vas rcmoved from the shoreline.
Soil borings completed for sitc characterization
(approximate 51,000,000 value) \vere funded by under-
runs in the original scope of work.
A \vards/ Client Commendations:
Received consistent level I award fee ratings from the
client. Completed original scope ahead of schedule and
$1,000,000 under budget.
Senior Project Manager, Midway Island, Pacific
Division Naval Facilities Engineering Command,
Wake Island, 04/1998 - 06/1998. This was an
emergency response cost plus award fee IDIQ project to
drain, clean and plug an abandoned pipeline containing
aviation fuel under hydrostatic pressure. Prior to
SHAW ENVIRONMENTAL, INC.
06C122006T
mobilization, another task was added to remm'e drums
of asphalt material from the beach that were exposcd by
a storm e\'ent.
I\ wards/ Client Commendations:
Recci,'ed a perfect IOO'Yo award t-ee ratings from the
client and a letter of commendation from the US Fish
and \Vildlife.
Senior Project Manager, Wahiawa UST removal and
Replacement, Pacific Division Naval Facilities
Engineering Command, Oahu, HI, 09/1997 -
08/1998. This \vas a cost plus award fee [DIQ project
to remo'"e and dispose of :2 single-wall underground
storage tanks and replace with :2 new double-wall
underground storage tanks \vith leak detection s:'stcm.
Fuel from the removed tanks was pumped into a
temporary storage tank and filtered for reuse.
,\ wards/ Clien t Commendations:
Rccei,'ed consistent le,"el I award fee ratings from the
clien t.
05/1995 - 06/1997, Project Manager,
Morrison Knudsen Corporation, Crane, IN
Responsibilities included O\Trall project management
and supelTision of project staff for an 58 million dehery
order under a Na,'y RAe. i\[r. Downey was responsible
for successful execution of this project within cost and
schedule budgets. He \vas also responsible for O\'erall
project safety and (Iuality. Other responsibilities include
interfacing with client and regulator personnel as well as
reporting project status to client and internal
managemcnt.
The following is a summary of key projects:
Project Manager, NSWC Crane, South Division
Naval Facilities Engineering Command, Crane, IN,
05/1995 - 06/1997. This project included design,
construction, and startup of a biorcmcdiation facility to
treat m'cr 100,000 CY of soil contaminated with TNT,
RDX, and Hi\DC The facility included three structural
steel treatment buildings measuring 70' X 300' each, a
truck decontamination facility, material storage facility,
and surface water collection basins. This project also
included an 8-acre RC~\ cap and removal and disposal
STEVEN T. DOWNEY 3
e
-'
<(
<f)
o
a.
o
a::
a.
<f)
I
....
u.
o
UJ
<!J
<(
a.
~
....
f=
UJ
I
....
Z
o
Z
o
f=
u
ii'
....
<f)
UJ
a::
UJ
I
....
o
.~
:J
<f)
!Q
....
UJ
UJ
I
<f)
<f)
I
....
z
o
o
UJ
z
;;'
....
z
o
u
<(
....
<(
o
u.
o
UJ
a::
:J
<f)
g
u
<f)
is
a::
o
UJ
<f)
:J
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
of soil contaminated with lcad, pesticides, asbestos, and
VOCs.
Accomplishments:
Complctcd all remediation activities, as \vell as design,
construction, and start-up of the biorcmediation facility.
t-,[r. Downey implemented a dcsign change in the
operating procedures that resulted in a 500,'-;, increase in
throughput for the bioremediation facility that effected a
2-year reduction in treatmcnt duration and a cost saving
of m'er S5,000,000.
03/1989 - 04/1995, Project Manager,
Westinghouse Savannah River Company,
Aiken, SC
Responsibil.ities includc O\'crall projcct management and
supen'ision of project staff. i\[r. Downcy was
responsible for successful cxecution of projects within
cost and schedule budgets. He was also responsible for
O\Trall project safety and Lluality. Other responsibil.ities
include interfacing with client and regulator personnel as
wcll as rcporting project status to clicnt and intcrnal
managemcnt.
The following is a summary of key projects:
Project Manager, Various projects, U.S. Department
of Energy, DOE Savannah River Site near Aiken,
SC, 03/1989 - 04/1995. Mr. Downey managed various
project associated with safety enhancement and
producti\'ity increases for production reactors and
support facil.ities for a high-le\'el radioacti\'c waste
processing facil.ity at the DOE Sa\'annah River Site near
,\iken, sc. Projects includcd:
. Late \,\rash Facility (S50,000,000) - Managed design of
a high-lenl radioactin waste pre-treatment facility.
This was a remotely operated process facil.ity designed
to reduce nitrite levels in a highly radioactive
prccipitate waste feed stream containing suspended
cesium. The design team consisted of over 60 design
professionals from \'arious discipl.ines including
Ci\'il/Structural, t-,[echanical, Electrical, and Process.
i\ pilot scale facility was also designed and
constructed to allow for process testing and
optimization. Mr. Downey led the design of this
modular facility that was built and operated by the
University of South Carol.ina.
. Reactor Fast Shutdown System ($22,000,000) Mr.
Downey led a design team in the completion of a
SHAW ENVIRONMENTAL, INC.
06C 122006T
conceptual design for a system to reduce reactor
pmver by 60(~) within 100 ms following a catastrophic
cooling water pipe failure and presented the project to
DO E for \'alidation. This project was ranked as the
best nlidation presentation of the 22 presented for
\'alidation during that cyclc at the Sa\'annah Ri\'er Site.
. Improved Reactor Spray System for P-Reactor
($ 18,000,000) - t-,[r. Downey led a design team in the
completion of a conceptual design for an emergency
cooling spray system and presented the project for
DOE val.idation. The projcct was successfully
validated.
. Composite Liner System for Emergency Cooling
Water Basin ($ 12,000,000) - i\lr. Dmvney managed the
design and construction of a multilayer composite
l.iner system and floating cm'er for a 50,000,000 gallon
earthen basin that was completed under budget and
on schedule.
. Soil Stabilization Project for [(-Rcactor ($21,000,000)
- t\[r. D()\\;neJ' managed the design and
implementation of a soil stabilization project to
prm'ide protection of reactor cooling water piping
during a seismic e\'ent; project im'oked drill.ing and
injecting grout into the substrate approximately 120
fect below the ground surface. This project \vas
completed within budget and on schedule.
. Glass \,\'astc Storage Facility #2 (5100,OOO/JOO) - i\[r.
Dmvney managcd the conceptual design of an
underground storage facil.ity and superstructure to
house processed high-level radioacti\'e \vaste canisters
from the Defense \,\'aste Proccssing Facility (a
\'itritlcation facility to process high-b'el radioactin
waste) and prcsentcd the project for DOE val.idation.
The project was successfully val.idated.
. railcd ELluipment Storage Vaults 3-6 (526,000,000) -
i\[r. DO\vney managed the conceptual design for 4
additional underground concrete storage vaults to
housc failed melters and other major equipment
associated with the Defense \,\'aste Processing Facility
and prcsented the project for DOE nl.idation. The
project was successfully \'alidated.
. Groundwater Pump and Treat System (53,000,000) -
t-,[r. Downey managed design and construction of a
groundwater pump and treat system consisting of 12
extraction wells, an air stripper, catalytic oxidation
system, and associated piping.
STEVEN T. DOWNEY 4
.
-'
<(
(fJ
o
"-
o
0:
"-
(fJ
I
t-
eL
o
W
(9
<(
"-
~
t-
>=
W
I
t-
Z
o
Z
o
>=
<.)
ir
t-
(fJ
W
0:
W
I
t-
O
.~
CD
::::>
(fJ
!!l
t-
W
W
I
(fJ
(fJ
I
t-
Z
o
o
w
z
;;'
t-
Z
o
<.)
<(
t-
<(
o
eL
o
W
0:
::::>
(fJ
g
<.)
(fJ
is
0:
o
W
(fJ
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Karl A. Eisenhart, P.E.
Why Selected as Key Personnel for Contract
. Over 20 years of experience in the areas of
engineering and quality assurance/quality
control (QA/QC) project management.
. Responsible for providing QAlQC oversight and
engineering support for multiple construction,
remediation and civil projects
Education
r.LB.A., Busincss, Baker University, 2005
B.E., r.faterials Scicnce & Engincering, Johns Hopkins
Uni\'ersity, 1982
Reg istrations
Professional Enginccr, l'.,[echanical, 2000, I G 1..J...J., KS, N J,
TN, V [\
Background Summary
1'.,[r. Eisenhart is a Registered Professional Enginecr with
o\'cr 20 ycars of cxpcricncc in thc areas of cngincering
and qualit\" assurancc/quality control (Qi\!Qc) project
managcmcnt. Hc is responsiblc for implcmcntation of
cluality management systcms for rcmedial im"cstigations
and studics, cnginecring dcsign projccts, inspcction and
documcntation of construction and rcmediation
acti\"ities to \"crify compliancc with planning documcnts,
specifications, and Q,\/QC requircmcnts. He also
prm"ides engineering support to project management
whcn rcquired. His experience also includcs
construction management, specification de\"elopmcnt,
permit and plan prcparation, engineering design, design
rc\"icws, and construction management.
As Program QC ~[anager for thc $270 million USI\CE
KCTERC Contract i\lr. Eisenhart is responsible for
review and approval of client task order delivcrables
related to all phases of rcmedial investigations, design,
remediation, and site closure. He is also responsible for
assigning QC staff for task order projects and providing
program specific QC training and scrves as Shaw's
point-of-contact with USACE and regulatory pcrsonnel
for program and task order QC issucs.
I SHAW ENVIRONMENTAL, INC.
06C 122006 T
Mr. Eisenhart has also been responsible for providing
QA/QC oversight and cngineering support for multiple
construction, remediation and civil projects for USACE,
Air Force, and FE~L\ clicnts. These projects included
the following activities: ci\"il construction, underground
utilitics, stormwatcr and sanitary sewer installations,
materials testing, poured-in-place concrete structures,
pressure piping and force mains, field welded tanks,
erection of steel structures and buildings,
instrumentation and controls, electrical and mechanical
systems, geomembranes, landfill closures, gas collection
systems, pretreatment facility construction, sUf';eying,
construction documcntation and othcr relatcd acti\"ities.
Relevant Experience
05/1991 - Present, Quality Control
Manager/Project Engineer, Shaw
Environmental & Infrastructure, Inc.,
Program QC r.lanagcr for the S270 million US,\CE
Kansas City Total Em'ironmental Rcstoration Contract
(KCTERC. Rcsponsible for development and
implementation of thc QC programs for all task orders.
Responsible for rc\"icw and apprm"al of task order
delivcrablcs. I\ssigning QC staff for task ordcr projccts
and providing program spccific QC training. Scn"e as
Sha\v's point-of-contact with USI\CE personnel for
program and task order QC issues. Recent projects have
includcd: Former Nanl Ammunitions Depot, Hastings,
Nebraska; Lakc City i\rmy Ammunition Plant,
Independcncc, r.[issouri; Sunflower Army Ammunition
Plant, DeSoto, Kansas; St. Louis Downtown Site; and
Shattuck Chemical Superfund Site, Delwcr, Colorado.
The following is a summary of key projects:
Program Quality Manager, FEMA IA T AC
Contract, Federal Emergency Management Agency,
Various Locations, 09/2005 - Present. ~[r. Eiscnhart
is responsible for the development and implemcntation
of thc Quality Program for all task ordcrs under the
FEMA IA-TAC Temporary Housing Contract. This
includcs thc rc\"iew and approval of quality plans,
checklists and standard opcrating procedurcs neccssary
for verifying compliance with scopc of work, contract
technical exhibits and approved detailed designs for
construction of group and commercial sites, and private
sites. He is also in charge of assigning amI managing
quality staff responsible for oversight and
KARL A EISENHART I~
.
-'
-<
UJ
a
0-
a
'"
0-
UJ
I
>-
u.
a
w
CJ
-<
0-
W
..J
>-
>=
w
I
>-
z
a
z
a
>=
u
cr:
>-
UJ
W
'"
W
I
>-
a
.~
<Il
::J
UJ
~
>-
w
W
I
UJ
UJ
I
>-
z
a
a
w
z
;:c
>-
z
a
u
-<
>-
-<
o
u.
a
w
'"
::J
UJ
g
U
UJ
o
'"
a
w
UJ
::J
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
documentation of field activities associated with
installation of temporary housing units and
infrastructure at group, commercial and private sites.
These design/build projects have included: site planning,
NPDES permitting S\'(1)PP de\'elopment, sediment and
erosion control, installation of site utilities, pump
stations, wastewater treatment plants, asphalt and
concrete pavement, ADA compliance, installation of
trailers and modular structures, potable water quality
testing, and other related activities. He performs quality
assurance of operations and maintenance procedures
and activities for compliance with technical exhibits,
subcontract documents, and local and international
building codes (IBC). O\'ersight of the central record
file management system.
Program Quality Control Manager, Kansas City
Total Environmental Restoration Contract, U.S.
Army Corps of Engineers - Kansas City District,
Various, OS/2002 - Present. Responsible for
development and implementation of the QC programs
for all task orders performed under the KCTERC.
Responsible for review and apprm'al of all task order
deliverables. Assigning QC staff for task order projects
and prm'iding program spccific (~C training. SenT as
Shaw's point-of-contact with US" \CE personnel for
program and task order QC issues.
Accomplishments:
Developed QC programs for all of the KCTERC task
orders. Re\'ie\ved and appro\'ed ()\'cr 200 plans and
reports associated with execution of task orders.
A wards/ Client Commendations:
Received President's and Vice President's Safety a\vards
for \'arious KCTERC task orders.
QC Manager/Field Engineer, Former Naval
Ammunition Depot - Hastings, U.S. Army Corps of
Engineers - Kansas City District, Hastings, NE,
11/2000 - 10/2004. Responsible for overall
implementation of the QC program during removal of
surface soil contaminated with lead, explosi\'es, and
carcinogenic polycyclic aromatic hydrocarbons.
Responsible for oversight of soil and liquid sampling,
waste handling and disposal, site restoration, and
remedial action and removal action reports. Served as
Shaw's QC point-of-contact with the USACE and
I SHAW ENVIRONMENTAL, INC.
06C122006T
regulators Q\'erseeing surface soil remediation and non-
time critical removal actions.
Accomplishments:
Completed three surface soil remQ\'al projects on
schedule and under budget.
A wards/ Client Commendations:
Received USACE Project L\lanager accommodation
letters for the Site 4 and Residential surface soil
remediation projects.
QC Manager/Project Engineer, Phase I - Barracks
Renewal Program, USACE, Fort Leavenworth, KS,
08/2000 - 12/2000. Responsible for developing,
submitting, and tracking all contract deliverables for soil
cut/ fill and surcharge operations, remo\'al and
replacement of a 12 inch gas main, extension of the
sanitary sewer and potable water system and high \'oltage
line relocation. Responsible for implementation of
US;\CE three-phase inspections, day-to-day direction to
subcontractors, development of field \vork \'ariances and
modifications, record as-built dra\vings, scheduling and
itl\'oicing through the USACE QCS computer program.
i\ccomplishments:
Completed \vork on schedule within allotted budget.
QC Manager/Project Engineer, New Gymnasium
Construction, USACE, \Vhiteman Air Force Base,
MO, 06/2000 - 08/2000. Responsible for c!e\'eloping,
submitting, and tracking all contract deli\'Crables for
construction of a new gymnasium which included all
civil, HV AC, plumbing, electrical, structural,
architectural and sporting equipment. US"-\CE QCS
computer program was utilized for tracking submittals,
cost and scheduling, invoicing and daily reports.
[\ccomplishments:
Completed submittal of contract deliverables and
received approval from US,\CE.
QC Manager/Field Engineer, Operable Unit 3
Groundwater Treatment System" U.S. Army Corps
of Engineers - Savannah District (SADTERC),
Milan Army Ammunition Plant, TN, 02/1997 -
09/1998. QC L\Ianager/Field Engineer for construction
of the 1300 GPt\[ OU-3 groundwater treatment system
at the Milan Army Ammunition Plant under the USACE
I KARL A. EISENHART D
.
...i
<<
IJJ
a
a.
a
a::
a.
IJJ
I
f-
u..
a
w
'"
<<
a.
~
f-
>=
W
I
f-
Z
a
z
a
>=
()
C<
f-
IJJ
W
a::
w
I
f-
a
.~
!D
::J
IJJ
!Q
f-
W
w
I
IJJ
IJJ
I
f-
Z
a
o
w
Z
::;:
f-
Z
a
()
<<
f-
<<
o
u..
a
w
a::
::J
IJJ
'3
()
IJJ
Ci
a::
a
w
IJJ
::J
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Savannah TERC Contract. Responsible for
development and implementation of the QC program
for all construction and drilling activities. Coordinated
all on-sitc and off-site testing and analytical activitics to
support construction and wastc disposal activities.
Served as Shaw's QC point-of-contact with US,\CE's
personnel overseeing constmction activities. Prepared
and coordinated submittal of all contract related
delinrables including the record as-built drawings.
Accomplishments:
Successfully completed constmction of the plant and the
plant effluent met the surface \vater discharge
requirements per the NPDES permit.
A wards/ Client Commendations:
Project rccci\"Cd a "Celebrate Safety" a\V'ard from the
USACE t\[obile District.
QC Manager, Site Remediation - Presidio of San
Francisco, , U.S. Army Corps of Engineers -
Sacramento District (SACTERC), San Francisco,
CA, 01/1996 - 02/1997. Responsible for onrall
implementation of the QC program during removal of
over --1-0 ,\STs and USTs, rcmonl of over 25,000 feet of
the fuel distribution system pipeline, soil and liquid
sampling, \vaste handling and disposal, site restoration,
site investigations and closure reports. Served as QC
point-of-contact with the USI\CE and National Park
SetTice representati,"es O\Trseeing remediation and
abatement acti,'ities.
Accomplishments:
Completed tasks within budget and on schedule.
QC Manager/Fie[d Engineer, UST Removals -
Former Stead Air Force Base, , U.S. Army Corps of
Engineers - Sacramento District (SACTERC),
Reno, NV, 08/1995 - 10/1995. Oversaw removal of
m"er 100 underground storagc tanks (USTs), soil and
waste disposal sampling, waste disposal, site restoration
and closure reports. SetTed as point-of-contact with
county and state em"ironmental personnel overseeing
UST remm"als.
Accomplishments:
Completed removal activities ahead of schedule within
the budget.
SHAW ENVIRONMENTAL, INC.
06C122006T
QC Manager/Field Engineer, Williams Air Force -
Landfill LF-04 Capping, , Air Force Center for
Environmental Excellence (AFCEE) - Site Capping
Contract, Mesa, AZ, 02/1995 - 07/1995. Ovcrsawall
aspects of work acti\"ities during the installation of a
pcrmcable cap m"er the 3--1- acrc landfill site, excavation
over 109,000 cubic yards of soil from a 4,200 ft. long
drainage channel, and the constmction of a 338 ft. long
reinforced concrete retaining wall. \';rork on drainage
channel and retaining wall was performed in accordancc
with the Maricopa County Specifications for Public
\,forks Constmction.
Accomplishments:
Completed the project 3 months ahead of schedule and
over S300,OOO below budget.
QC Manager/Field Engineer, Landfill (LF-03)
Closure, Air Force Center for Environmental
Excellence (AFCEE) - Site Capping Contract,
Warner Robins Air Force Base, GA, 10/1994 -
02/1995. Served, as IT's point-of-contact for QC and
field enginecring during the installation of geosynthetic
clay lincr, GO-mil HOPE liner, drainage geocomposite
and soil cmTr m"cr ] ,and fill LF-03. Prm"ided da\.-to-da\"
. .
direction to geotechnical, SutTey, ci,"il and mechanical
subcontractors.
Accomplishmcnts:
Succcssfully coordinated field modifIcations relatcd to
elimination of sand drainagc laycr and replaccment with
drainagc geocomposite layer.
KARL A. EISENHART 3
.
-'
<(
en
o
a.
o
a::
a.
en
r
f-
u.
o
w
Cl
<(
a.
'::l
f-
>=
W
J:
f-
Z
o
Z
o
>=
u
a:
f-
en
w
a::
w
J:
f-
o
f-
.~
en
!!!
f-
W
W
J:
en
en
r
f-
Z
o
o
w
z
;j'
f-
Z
o
U
<(
f-
<(
o
u.
o
w
a::
::>
en
g
u
en
Ci
a::
o
w
en
::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Nessim S. Eskinazi, P.E.
Education
l\1.13.:\., Internationall\larkcting & Finance,
Northeastern Uni\Trsity, 1981
l\1. E., Electrical Engineering, N ortheas tern University,
1975
B.E., Electrical Engineering, Northeastern University,
1970
Registrations
Profcssional Engineer: r.L\, r.IO, NC, R[
Background Summary
l\Ir. Eskinazi has O\'er 20 years of di\'erse experience in
consulting, engineering, cons truction, s tart-up and
maintenance, cost and schedule control, and project
management of small fast track and large domestic and
foreign projects in a wide range of industries. He is a
registcred professional cnginccr with a strong
background in P\,\l{' and B\'\'R nuclear plants, as well as
fossil and hydro plants. Currently, he is the Lead
Electrical Engineer on the Brandon Shores fossil powcr
plants FG D projcct. Pre\'iously, hc \vas Lead Elcctrical
l:nginccr on the r.lassachusetts Highway Dcpartmcnt
Ccntral Artery, the r.lBT A Bus r.laintcnancc Facility,
Housing Pri\'atization of se\'cral ,\ir Forcc and Army
Bascs, and misccllancous ongoing commcrcial and
industrial projects. His duties include pcrforming
electrical calculations and prcparing elcctrical e(luipmcnt
and construction specifications, system designs,
construction support, and contract management. He
prepared the design modifications for the Control
Building Air Handling system at the Seabrook Nuclcar
Station, performed major electrical calculations for the
l\lillstone Nuclear Station, Units 2 and 3, and evaluated
the adequacy of electrical systems in sc\'cral buildings for
a Fortune 500 Telecommunications Company.
i\t Stone & \Vebster Mr. Eskinazi has scrvcd in sevcral
capacities. As Project l\[anager, he succcssfully
completed the design, enginecring, and construction of a
photovoltaic solar plant, and a study for licensing,
engineering, and construction of a Modular High
Temperature Gas Reactor plant. He was in chargc of all
engineering and construction services for the TV A
Scquoyah Nuclear Plant and the electrical construction
and piping certification at the l\lillstonc N uclcar Plant,
Unit 3. He was also the Project Engineer on the Beaver
Vallcy Nuclcar Station, the Lead Elcctrical Engincer on a
fcasibility study for the expansion of two hydroelectric
plants, and Specialist for transformcrs, station
distribution systems, and lighting systems. He served as
Liaison Electrical Engineer at the North Anna Nuclear
Station, coordinating the activities of the engineering,
construction, and client organizations
Prior to rejoining Stonc & Webstcr Engineering
Corporation (Stone & \'\'ebster) in 1995, l\Ir. Eskinazi
workcd for Boston Edison Company. As Chief
Engineer, he directed and supelTised all electrical
enginccring activities for all fossil and combustion
turbine gencrating stations. Hc was responsible for the
design, procurement, constmction, and tcsting of a 4-80
V double-ended substation. Hc also managed several
modifications for thc Pilgrim Nuclcar Station.
Pre\'iously, 1\[r. Eskinazi worked at Burns & Roc, [nc. as
an Electrical Engineer and Field Liaison Engineer on a
nuclear plant. Hc was also a rield Engincer at Bechtel
Corporation where his responsibilities included
cnginccring, dcsign, and pre-operational testing of fossil
and nuclear plants. He worked in the Industrial
Department of Raytheon, where his responsibilities
increased from layout drafting and dcsign to performing
calculations and preparing specifications for industrial
projccts.
l\Ir. Eskinazi is a Lecturer at Northeastern Uninrsity for
e1cctrical engineering courscs. Hc also published a paper
for thc Edison Electric Institute on the Installation and
Opcrating Expericnce with Adjustablc Spced Drivcs,
and developed as well as taught a \vorkshop on
managing small fixed price contracts.
Relevant Experience
09/1995 -Present, Lead Electrical
Engineer, Shaw Environmental &
Infrastructure
Directed the cntirc elcctrical cngineering and design for
Flue Gas Desulphurization (FGD) project for randon
Shores Units 1 & 2. The scope includes the extcnsion of
230kV transmission lines, the addition of several power
transformers (60/80 !'vIVA, 15/20!'vIVA, and smaller),
SHAW ENVIRONMENTAL. INC.
NESSIM S. ESKINAZI
06C122006T
e
-'
<(
<fJ
o
"'-
o
'"
"'-
en
I
>-
"'-
o
w
"
<(
"'-
w
-'
>-
>=
w
:r:
>-
z
o
z
o
>=
u
0:
>-
<fJ
W
'"
W
:r:
>-
o
>-
ei
en
~
>-
w
w
:r:
en
en
I
>-
z
o
o
w
Z
<(
>-
z
o
u
<(
>-
<(
o
"'-
o
w
'"
::>
en
o
-'
U
en
o
'"
o
w
en
::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
power distribution centers including 13.8kV, ..J-.16kV and
..J-80V sw'itchgear, underground ductbanks, etc. He also
provided electrical support for the design of a lift
station, a 7,OOOft long limestone and gypsum material
handling (conveyor) system, a waste \vater treatment
facility, and other auxiliary systems. Developed project
schedules and cost estimate. Prepared system design
criteria and specifications.
The following is a summary of key projects:
Project Manager, South Boston Piers Transitway
Project, MBTA, Boston, MA, 02/2000 - 06/2006.
Design and Construction of a [\[aintenance Facility for
electrical/ diesel and compressed natural gas fueled ..J-O ft
and 60 ft busses
Accomplishments:
Designed, supported construction and start-up of the
electrical power, lighting, fire detection and gas detection
systems, including prm'isions for [-lazardous Class I,
Di\'ision 2 locations.
Project Manager, New Haven Diesel Shop
Reconstruction, Connecticut Department of
Transportation, Boston, MA, 09/1998 - 12/2000.
[\[odify existing maintenance facility for trains.
,-\ccomplishments:
Designed modifications to the diesel shop, the train
washer system, the normal and emergency electrical
distribution systems, and the gas detection and
monitoring system in Class 1, Division 2 areas.
Project Manager, Maritimes and Northeast Meter
Stations, M&N Gas Company, Maine & MA,
09/1999 - 03/2000. Design and construction support
for twelve gas metering stations in [\[aine and
t\lassachusetts.
Accomplishments:
Designed and supported construction of the gas
metering stations, including the electrical, controls and
instrumentation systems and the electrical selTice to
each station.
Project Manager, Clayton Gas Compression Station,
North Carolina Natural Gas Company, Boston, MA,
01/1999 - 03/2000. Design and Construction of a
. .
compression gas station.
SHAW ENVIRONMENTAL, INC.
06C122006T
Accomplishments:
Established the Class 1, Division I and Division 2
Hazardous Classifications for plant areas, and designed
the entire electrical distribution system for two 1800 hp
compressor stations, including the sen'ice entrance,
grounding, interior and exterior lighting, and cathodic
and lightning protection systems. Prepared the
procurement specifications for UPS, emergency
generator, motor control center, and pO\ver distribution
switchboards. Performed bid evaluations and prepared
the electrical and instrumentation installation
specification. PrO\'ided support for construction and
. . . .
station commlsston111g.
Project Manager, Nantucket Compost Facility,
Waste Options Nantucket, LLC, Boston, MA,
07/1998 - 12/1999. Design/build first of a king
compost facility.
;\ccomplishments:
Directed the engineering, design, construction
management, testing and start-up of the electrical and
process control work, inclucling the design of the
electrical distribution throughout the plant.
Project Manager, Seabrook Station, Northeast
Utilities, Seabrook, NH, 04/1997 - 07/1997. Design
and construction of modifications to nuclear plant.
Accomplishments:
Directed the electrical and control system design for the
Control Building Air Handling System. Prepared
schematic diagrams, sized feeder cables, and circuit
breakers, re\'ised ,'endor drawings and calculations to
reflect the installation of new chillers and auxiliary
systems.
Project Manager, Delaware City Compression
Station, Eastern Shore Natural Gas Company,
Delaware City, DE, 01/1996 - 03/1997. Design and
construction of a natural gas compression station.
Accomplishments:
Designed the entire electrical distribution system for the
station. Preparcd the procurement specifications for
UPS, standby generator, power distribution
switchboards, powcr panels, motor controllers, and
electrical installation. Performcd bid evaluations, and
NESS 1M S. ESKINAZI
2
.
-'
0{
VJ
a
a.
a
'"
a.
VJ
I
>-
u.
a
UJ
co
0{
a.
~
>-
>=
UJ
I
>-
Z
a
z
a
>=
u
ii:
>-
VJ
UJ
'"
UJ
I
>-
a
>-
.~
VJ
!!l
>-
UJ
UJ
I
rJ)
VJ
I
>-
z
a
o
UJ
z
;;:
>-
z
a
u
0{
>-
0{
o
u.
a
UJ
'"
:::l
VJ
a
-'
u
VJ
o
'"
a
UJ
VJ
:::l
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
prm'idecl support for construction and station
commlsslon1l1g.
Project Manager, Maine Yankee Atomic Power
Station, Maine Yankee Atomic Power Company,
Barth, ME, 02/1996 - 01/1997. Design and
construction of modifications to nuclear plant.
Accomplishments:
Directed the onrall electrical and control design of
modifications to the Atmospheric Steam Dump and the
High Energy Line Break Systems.
Project Manager, Millstone Nuclear Plant Units #2
& 3, Northeast Utilities, CT, 09/1995 - 01/1996.
Perform and update calculations for major electrical
eqU1pment.
Accomplishments:
Re\.iewed calculations for sizing im'erters and \.ital bus
feeder cables for Unit 3. He also performed a dynamic
analysis of the ..J- k\' and 6 k\' safcty relatcd motors
under accident conditions, for Unit 2, using the E'L\P
computer program.
Project Manager, Hawks Nest-Glen Ferris Hydro
Plants, Union Carbide, Glen Ferris, WV, 03/1975 -
11/1975. Feasibility study for expanding existing hydro
plants.
i\ccomplishments:
Pcrformed a study to detcrmine the feasibility of
expanding the hydroelectric gcncrating capacity of the
existing Hawks Nest and Glen Ferris plants up to 40
1\[\'\'. Prepared alternate schemes for 25 Hz and 60 Hz
generation and order-of-magnitude construction cost
cstimates for the most promising arrangements,
including transmission and switching facilities.
Senior Electrica[ Engineer, Reliability Improvement
Program, Fortune 500 Telecommunications
Company, Boston, MA, 09/1995 - 12/1995.
E\'aluation of the elcctrical distribution system at scveral
sites of a Telecommunication Company
Accomplishments:
Performed short circuit calculations, evaluated the
design adequacy of the electrical distribution system at
SHAW ENVIRONMENTAL, INC.
06C 122006T
several sites, and made recommendations for
Improvements.
Project Manager, Comanche Peak Stearn Electric
Station, Unit 1, Texas Utilities, Dallas, TX, 06/1986
- 12/1988. Reviewed major electrical calculations.
Accomplishments:
Reviewed major electrical calculations and system design
for the sequential loading of the emergency diesel
generators, DC batteries and battery chargers, short
circuit, and \'oltage profile calculations. Validated the
entire plant lighting system, including IOCFR50
.Appendix "R" recluirements.
12/1988 - 09/1995, Lead Electrical
Engineer, NStar (previously Boston
Edison Company), Project Engineering
Department, Boston, MA
As Lcad Elcctrical Enginecr 1\[r. Eskinazi dirccted and
supen'ised the Electrical Group \vhich was accountable
for the engineering, procuremcnt, and installation of thc
electrical work in support of the l\fystic and Ne\v Boston
fossil stations, and the l\fedway combustion turbine
stations. Thc \vork includcd implementing state-of-thc-
art technologies for data acquisition, communication,
protective relaying, large adjustable speed dri\'es (ASD),
UPS, 13.8 k\',..J- k\', and ..J-80 V s\vitchgear, motors, and
powcr distribution systems. Pcrformed load flow,
voltage profile, and short circuit calculations, using thc
DAPPER and i\-Fault programs.
Electrical Engineering, Pilgrim Nuclear Station,
Pilgrim Nuclear Station, Plymouth, MA, 12/1988 -
12/1991. Provided electrical support to the operation of
the Pilgrim Nuclcar Station.
Accomplishments:
1\fanaged several modifications at the Pilgrim Nuclear
Station which brought the unit in sen'ice after the NRC
shutdown. Designed a radio transfer scheme to test the
diesel generator and other modifications in compliance
with Station Blackout Rulc IOCFR50.G3.
NESSIM S. ESKINAZI
3
e
..J
<{
(/)
a
a.
a
a::
a.
(/)
I
>-
u.
a
w
CJ
<{
a.
~
>-
>=
W
I
>-
Z
a
z
a
>=
u
ii"
>-
(/)
w
a::
w
I
>-
a
>-
ei
(/)
'!l
>-
w
W
I
(/)
(/)
I
>-
z
a
o
w
z
;(
>-
z
a
u
<{
>-
<{
o
u.
a
w
a::
::::>
(/)
a
..J
u
(/)
i5
a::
a
w
(/)
::::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
06/1986 - 12/1988, Senior Electrical
Engineer, Stone & Webster, Electrical,
Boston, MA
As Senior Electrical Engineer, t\[r. Eskinazi re\'icwcd
major electrical calculations and system design for the
Comanche Peak - Unit 1 Nuclear Power Plant. He also
reviewed calculations for the sequential loading of the
emergency diesel generators, DC batteries and battery
chargers, short circuit, and \'oltage profile calculations.
He validated the entire plant lighting system, including
IOCFR50 Appendix "R" retluirements.
06/1987 - 02/1988, Assistant Project
Manager, Stone & Webster, Project
Management, Sequoyah, TN
As Assistant Project J\Ianager, t\[r. Eskinazi coordinated
all engineering and construction support services for the
Sequoyah Nuclear Plant prestart program. These
ser\.ices included analysis and redesign of pipe supports
and supports of major components, resolution of
integrated dcsign inspcction by the NRC, consulting to
the Client management team, and field cngineering
sCr\'ices in support of construction. Thc project
organization was comprised of 350 engineers and
administrati\'e personnel assigned to five office locations
and at thc construction site.
He also prepared proposals, ncgotiatcd contract and
implemented the \\iork under accelerated schedulcs and
expedited collection of payments.
The following is a summary of key projects:
Project Manager, Sequoyah Nuclear Plant, Unit 2,
Tennessee Valley Authority, TN, 06/1987 - 02/1988.
Prm'ided project management and cost and schcdule
controls for enginecring and design contract.
Accomplishments:
Coordinated all engincering and construction support
services for the Sequoyah Nuclear Plant prestart
program. Prepared proposals, negotiated contract and
implemented the work under accelerated schedules and
cxpedited collcction of paymcnts.
Project Manager, Workshop for Managing Small
Projects, Stone & Webster, Boston, MA, 03/1983 -
05/1984. Developed training workshop.
l-\ccomplishments:
De\'eloped a comprehensive workshop for training key
senior le\'c! employees in the proper management,
administration, and execution of small and lump-sum
turnkey domcstic and international projects. Developed
and implemcnted markcting and operation activitics for
the company's Business Devclopment Plan for thc
country of South Africa.
02/1986 - 01/1987, Project Manager-
Project Engineer, Stone & Webster,
Project Management, Austin, TX
As Project Manager/Project Engineer, I\[r. Eskinazi
directed the technical functions for the engineering and
design of a 300 k\V photO\'oltaic solar plant, and
controlled the project schedulc and cost. The work
scope included the preparation of specifications for
etluipment procurement and construction contracts,
contract management, and the design and operation of a
data actluisition system.
The following is a summary of key projccts:
Project Manager, City of Austin, TX PV-300, ARCO
Solar, Inc., Austin, TX, 02/1986 - 01/1987. Design
and construction of a photo\"oltaic solar plant.
i\ccomplishmcnts:
Directed the technical functions for the cngineering and
design of a 300 k\\' photovoltaic solar plant, and
controlled the project cost and schedulc.
SHAW ENVIRONMENTAL. INC.
NESSIM S. ESKINAZI 4
06C122006T
.
...i
..
U)
o
"-
o
c:t:
"-
U)
I
>-
u..
o
w
'"
..
"-
~
>-
>=
W
I
>-
Z
o
Z
o
>=
to
0::
>-
U)
W
c:t:
W
I
>-
o
>-
.~
=>
U)
'!?
>-
w
W
I
U)
U)
I
>-
z
o
o
w
Z
;;'
>-
z
o
to
..
>-
..
o
u..
o
w
c:t:
=>
U)
'3
to
U)
o
c:t:
o
w
U)
=>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Andrew K. Fairbanks, P.E.
Education
I\I.s., Ci,'il Engineering, N ortheas tern University, 1981
B.E., Ci,'il Engineering, University of I\[assachusetts,
1975
Registrations
Professional Engineer: Structural, M,\
Relevant Experience
10/2006 - Present, Project Engineer IV,
Shaw Environmental & Infrastructure, Inc.
Responsibilities include pro,'iding support to client
projects and office staff as a senior technical consultant
as well as technical proposal preparation including
estimating, conceptual design, logistics, and technical
\\TI tlllg.
The following is a summary of kcy projects:
Structural Engineer, Mercer Generating Station,
PSE&G, NJ, 01/2007 - Present. In support of the
project cstimatc, 0.Ir. [7airbanks dcsigncd thc stiffcncrs
for a portion of the Unit I & 2 duct\vork.
Civil/Structura[ portion of proposal, Moab Tailings
Remediation Proposal, Department of Energy,
Moab, UT, 11/2006 - Present. Thc projcct proposal is
to cstablish the infrastructurc to relocatc 16 million tons
of low level radioacti,'c uranium tailings from Moab,
Utah to a disposal ccll site 30 miles away and
dcmonstrate the process by moving 2.5 million tons.
E,'aluation of se,'eral alternati,'es for excavation and
blending of the pile materials were pcrformed as well as
determining the most cost effecti,'e and lowest risk
method of moving the material to the railhead which is
200 feet above the pile and on the side of a stcep hill.
02/2003 - 10/2006, Project Manager, Del-
Jen, Inc, Services, Rolling Hills Estates,
CA
Project Manager in the services division with projccts
ranging from Base Operating Services (BOS) Contracts
on military installations to hurricane disastcr relief
contracts.
The following is a summary of key projects:
SHAW ENVIRONMENTAL, INC.
06C122006T
Corporate Consultant, Hurricane Katrina FEMA
Trailer Maintenance, FEMA, Baton Rouge, LA,
04/2006 - 10/2006. At project startup, Mr. Fairbanks
assistcd in setting up subcontracts, the quality control
function and e\'aluation, and site logistics.
Project Manager, Hanscom AFB BOS Contract,
U.S.Air Force, Hanscom AFB, 02/2003 - 04/2006.
As Project l'.[anagcr for the Base Operating Contract
(BOS) l'.Ir. Fairbanks responsibilities consisted of all
aspects of thc operation of the basc infrastructure
including
. l'.Ianagc the 150 person di,'crse workforce consisting
of a combination of union cmployees, professional
enginccrs, and busincss staff.
. rdaintain o"cr 200 structurcs on base and thc
infrastructure that supported them.
. Perform and managc dcsign and construction projccts
on basc and at the () remotc locations owned b\. the
base totaling bct\vcen 5 and 10 million dollars
annually.
. t\Iaintain thc 800+ landscaped acres
. I\Iaintain and pcrform snow rcmm'al for the 12 miles
of basc roadways and -1-0 parking lots.
. Sta~' within thc ccilings for all 15 contract linc itcms
with a total annual budgct of onr S 161'.1.
. f\Ianagc the project programming structure for thc
base funding relluirements
. Train the 2000 military members on base in
dcploymcn t readincss
. ,\dminister the base housing and dormitory
assignment program
. Logistics
. Quality control
. Em'ironmental monitoring and operation of
elwironmental cleanup projccts and mitigation efforts
Interfacing with the military base leadership as well as
the govcrnmcnt ovcrsight team.
Accomplishments:
Repeated Award Fees in the Excellent Category
Awards/Client Commendations:
Oel-J en Customer Service Project of the Year 2005
ANDREW K. FAIRBANKS
.
-'
<(
Ul
o
0.
o
""
0.
Ul
I
>-
u..
o
w
'"
<(
0.
~
>-
;::
w
I
>-
Z
o
Z
o
;::
u
02
>-
Ul
W
""
W
I
>-
o
.~
::J
Ul
!Q
>-
w
W
I
Ul
Ul
I
>-
z
o
o
w
z
;:;:
>-
z
o
u
<(
>-
<(
o
u..
o
w
""
::J
Ul
g
U
Ul
is
""
o
w
Ul
::J
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
01/2000 - 01/2003, Project Manager, Gale
Associates, Civil, Weymouth, MA
As Project I\Ianager, I\[r. Fairbanks was responsiblc for
the engineering, procurement selTiccs, and construction
phase ser\.ices for various public and private projects
consisting of athletic complexes, parks, parking lots,
roadway projects, and airport facility projects.
The following is a summary of key projects:
Project Manager, Framingham State College
Parking Expansion Project, Framingham State
College, Framingham, MA, 08/2002 - 01/2003. The
project consisted of a new sidchill parking lot. Mr.
Fairbanks' responsibilities included schcmatic design
studies of structure vs. at-gradc lot, cost cstimating,
design of retaining walls abm"c and below the lot, steam
linc relocation, drainage dcsign and tic-in to Mass
Highway Route 9 drainage system.
Project Manager, Pottle Street Athletic Field
Complex, Town of Kingston, MA, Kingston, MA,
03/2002 - 01/2003. The project consisted of the
engineering, procurement, and construction phase
sCLyices for the site de\"elopment of thc ncw II-field
complex including 23 acrcs of grading, drainagc,
wetlands replication, fencing, irrigation, parking lots and
roachvays, and planning board and conservation
commission interface. l\dditional scope included
redesign of the entrance road and support of land
takings by the Town.
Project Manager, Facility Assessment Project,
Rhode Is[and Airport Corporation, RI, 04/2001-
09/2001. The project consisted of the assessment of 20
existing buildings at six RIAC airports. Report includcd
cost estimates and recommendations regarding
rehabilitation and asset prioritization. Mr. Fairbanks
performed all inspections and compiled thc report.
Project Manager, Newport State Airport Snow
Removal Equipment Garage, Rhode Island Airport
Corporation (RIAC), Newport, RI, 06/2000 -
OS/2001. The project consisted of the engineering,
procurement, and construction phase services for a new
snow removal cquipment building. I\lr. Fairbanks'
responsibilities consisted of the engineering of the new
3000 square foot building, its foundations, and site
SHAW ENVIRONMENTAL, INC.
06C122006T
improvements and the procurement process finishing
with services during construction.
Project Manager, Town of Carver Purchase Street
Athletic Fields, Town of Carver, Carver, MA,
01/2000 - 11/2000. The project consisted of thc
engineering, permitting, procurement, and construction
phase services for a ne\v athletic field complex. I\[r.
Fairbanks engineered the permitting, field layout,
irrigation system, and parking lot. He also prepared the
procurement package for the \vork and prm"ided
construction phase ser\"ices.
02/1978 - 12/1999, Senior Civil/Structural
Engineer, Stone & Webster,
Civil/Structural Division, Boston, MA
Responsibilities consisted of all aspects of design and
engineering including bid document preparation,
proposal preparation, technical studies, permitting, client
interface, presentations, and technical writing.
Thc follO\ving is a summary of key projccts:
Senior Civil/Structural Engineer, Mass Highway
Department Concrete Bridge Inspection, Mass
Highway Department, Boston, MA, 10/1999-
12/1999. I\lass Highway required that all concrete arch
bridgcs be inspected in I\Iassachusetts as a precaution
after a structural problem develop cd on a similar
structure. I\[r. Fairbanks performed inspections of
numerous bridges on land and from the water surface
bencath as wcll as the superstructure abm"e and
compiled inspection results into the report submitted.
Senior Civil/Structural Engineer, MBT A
Transitway, Massachusetts Bay Transportation
Authority (MBT A), Boston, MA, 09/1998 - 05/1999.
The project consisted of thc cnginecring, procurement,
and construction phase services for the construction of
the Silver Line, an underground bus transitway. Mr.
Fairbanks provided general support in the procurement
and construction phase services portion of the project.
Senior Civil/Structural Engineer, Private Fuel
Storage Transportation Study, Private Fuel Storage,
LLC, Tooele, UT, 06/1998 - 09/1998. The project
consistcd of a fcasibility analysis of constructing a 26
mile rail line to a remote location for storage of nuclear
waste. Mr. Fairbanks' responsibilities included estimates,
ANDREW K. FAIRBANKS 2
.
..i
'"
(/)
o
0.
o
'"
0.
(/)
I
I-
u.
o
w
"
'"
0.
"j
I-
>=
W
I
I-
Z
o
Z
o
>=
u
0::
l-
(/)
W
'"
W
I
I-
o
.~
=>
(/)
'!l
I-
W
W
I
(/)
(/)
I
I-
Z
o
o
w
z
:;;:
I-
Z
o
u
'"
I-
<(
o
u.
o
w
'"
=>
(/)
g
u
(/)
o
'"
o
w
(/)
=>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
route evaluation, drainage considerations, permitting
feasibility, land taking e\'aluation, and alternatiH
analysis.
Senior Civil/Structural Engineer, Nantucket
Composting Facility, Waste Options, Nantucket,
MA, 03/1997 - 06/1998. The project consisted of the
engineering, procurement, and construction of a
composting facility on the island of Nantucket. The
facility consisted of a large rotating digester, a fabric
structure compost building, a biofilter building, and the
associated site\vork. t--[r. Fairbanks' responsibilities
included the engineering and procurement of the fabric
structures and their foundations as well as site
de\'elopment and construction phase services.
Senior Civil/Structural Engineer, United Parcel
Service Windsor Locks, United Parcel Service,
Windsor Locks, CT, 05/1992 - 06/1993. The project
consisted of the extension of taxiways and ramps to
sen'ice a new UPS warehouse facility adjacent to the
airport. Also included were drainage design and a glycol
reowery system. t--[r. Fairbanks prm'ided civil and
structural engineering support during the design and
construction phase.
Senior Civil/Structural Engineer, Town of
Middleborough GIS, Town of Middleborough,
Midd[eborough, MA, 08/1987 - 10/1988. The project
consisted of creating a digital mapping system for the
town. !\lr. Fairbanks worked close1\- with the to\vn and
aerial photogrammetry subcontractor in the
development of the data and structure for the basic
geographic information system.
Senior Civil/Structural Engineer, Town of Medway
Mapping, Town of Medway, Medway, MA, 02/1986
- 07/1987. The project consisted of aerial
photogrammetry and digital mapping of the town of
Medway, M1\. !\lr. Fairbanks responsibilities included
working with the photogrammetry subcontractor and
compiling the information to be included in the mapping
files to be delivered to the town.
Senior Civil/Structural Engineer, Bridgeport
Harbor Generating Station Coal Conversion Project,
United Illuminating Company, Bridgeport, CT,
02/1982 - 03/1983. The project consisted of converting
the plant from burning oil to burning coal. t--Ir.
SHAW ENVIRONMENTAL. INC.
06C122006T
Fairbanks responsibilities included the engineering and
procurement of the site ci\'il contract, structural steel
platform modifications, and general ci\'il/ structural
support for the project.
Senior Civil/Structural Engineer, Malakoff
Generating Station, Houston Power & Light,
Malakoff, TX, 09/1980 - 02/1982. Project consisted of
the design of the 600 t\l\V lignite-burning power
generation station. !\lr. Fairbanks \vas responsible for
the engineering and procurement of the miscellaneous
buildings and their reinforced concrete foundations.
Senior Civil Engineer, Patriot Generating Station,
Indiana Power & Light, IN, 05/1980 - 09/1980.
Project consisted of the design of the fossil powered
generating station. l\Ir. Fairbanks contributed to the
generation of the estimate for the fossil powered
generating station including structural steel and
reinforced concrete sizing and estimating.
ANDREW K. FAIRBANKS 3
e
u.
o
w
"
<(
a.
':i
>-
;::
W
I
>-
Z
o
Z
o
;::
u
ii'
>-
VJ
W
'"
W
I
>-
o
>-
ei
VJ
~
>-
W
W
I
VJ
VJ
I
>-
z
o
o
w
z
;;'
>-
z
o
u
<(
>-
<(
o
u.
o
w
'"
:::>
VJ
o
..J
U
VJ
o
'"
o
w
VJ
:::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
John W Finik, P.E.
Education
B.S., Ci\'il Engineering, Columbia Uni,"ersity, 1980
1L\., Mathematics, Bowdoin College, 1978
Registrations
Professional Engineer: Structural, NH
Background Summary
i\Ir. Finik is a Project i\Ianager and Professional
Engineer with more than 26 years of engineering, design,
and consulting and project management experience with
increasing responsibility gained from a broad range of
assignments. He has both performed and directly
supelTised engineering, design and construction phase
tasks for a variety of utility, municipal, infrastructure and
transportation projects. These tasks have included
management consulting, operations and maintenance
(O&[-..Q consulting, inspection/ e,"aluation of existing
facilities, preparation of needs analyses/ feasibility
studies, site selection studies and conceptual layouts; the
preparation of specifications, contract and bid
documents, design calculations, and engineering and
construction cost estimates; and the preparation of both
manually drafted and C\DD-generated construction
drawings. He is also experienced in construction phase
engineering, including the preparation of design changes
and the evaluation of contractor change recluests and
claims, with emphasis on configuration management and
claims avoidance. i\S a Project [-..Ianager in the
Transportation Department, he is responsible for the
day-to-day administration of a ,'arious multidiscipline
engineering consulting selTices contracts. His
responsibilities include identifying and cultin ting
potential new ,vork; developing proposals and
presentations; providing technical and administrative
direction; coordinating engineering, scope development,
schedules, and budget control; cJuality reviews of
engineering products; and managing subconsultant
services, all under various contract terms including Cost
Plus/NTE, Lump Sum and Indefinite Quantity (Task
Order) bases.
Among i\Ir. Finik's specialties are the execution of
General Engineering Consulting (Indefinite
I SHAW ENVIRONMENTAL. INC.
06C122006T
Ouantit:v/Task Order/On-Call SelTices) contracts, and
'- ~
the management of facility design projects. [n both
cases, his breadth of experience in all project phases,
familiarity \vith technical, commercial and construction
processes, and his ability to cJuickly mobilize the
necessary project resources and to effecti,"ely manage
multidiscipline, multi-firm teams has allowed Shaw to be
responsive to client needs while completing and
deliYering quality products on schedule and within
budget.
His facilities experience has been gained in the
transportation, utility, institutional and commercial
sectors, and ranges from light construction (office
buildings, parking garages, hospitals, warehouses and
outdoor commuter stations) to hea,"y construction,
including ,vater intake structures, hydro powerhouses,
higl1\vay and rail tunnel systems, and industrial-gradc
maintcnance facilities.
[-,,11'. Finik's power industry experience includes nuclear,
fossil (coal and gas), and h~'droclectric pO\ver projects,
where his rcsponsibilities hm"e included power plant
design (new concrete and steel structures, modifications
to existing structures, and seismic design/ qualification of
structures and electrical raccwa," s\'stcms) and
undcrground transmission projects. His infras tructurc
engineering experience has been gained from projects
related to highway, transit and raihvay engineering,
maintenance and warehousing facilities, and
transportation agency operations. He has becn
responsiblc for a wide variety of tasks for a number of
maintenance facility projects for commuter rail and light
rail \'Chicles, buses, and higll\vay departmcnt \"ehicles.
Relevant Experience
Project Manager I, Shaw Environmental &
Infrastructure, Inc.
Responsible for the day-to-day administration of a
various multidiscipline engineering consulting selTices
contracts. Responsibilities include identifying and
cultivating potential new work; developing proposals and
presentations; prO\"icling technical and administrative
direction; coordinating engineering, scope development,
schedules, and budget control; quality reviews of
engineering products; and managing subconsultant
services, all under various contract terms.
JOHN W FINIK Q
e
...i
..
en
a
"-
a
'"
"-
en
I
f-
u..
a
w
'"
..
"-
~
f-
;::
W
I
f-
Z
a
z
a
;::
u
ii'
f-
en
w
'"
W
I
f-
a
f-
ei
en
~
f-
W
W
I
en
en
I
f-
Z
a
o
w
z
;;:
f-
Z
a
u
..
f-
..
o
u..
a
w
'"
::::>
en
g
u
en
is
'"
a
w
en
::::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
The following is a summary of key projects:
Project Manager - General Engineering Consulting
Services, Massachusetts Turnpike Authority,
Weston, MA, 8/2005 - Present. Served as Project
t-.Ianager for Shaw's role on a team providing consulting
selTices to the i\uthority. Shaw"s rcsponsibility for areas
of expertise included geotechnical and foundations
engineering; blasting and tunneling; vehicle and
equipment maintenance facilities; mechanical, electrical
and fire protection; materials engineering, and
eIwironmental monitoring. Assisted with conducting
thc Triennial Inspcction (condition assessmcnt) of the
\'\"cstcrn Turnpikc.
Lead Civil/Structural/Architectural Engineer-
White Phosphorous Modernization Project, United
States Army, Pine Bluff Arsenal, AK, 10/2006-
Present. SeITed as Lead Civil/Structural/ i\rchitectural
Engincer for this facility modernization projcct. which
includes installation of ncw yard structurcs, foundations
and proccss equipment, installation of ncw proccss
equipment and systems in and associated structural
modifications to thc existing building.
Project Manager & Technical Consultant, South
Boston Piers Transitway Project, Massachusetts
Bay Transportation Authority (MBTA), Boston,
MA, 11/1998 - Present. SelTed as Project t-.[anager and
later as t-.Ianagement & Technical Consultant on a
project to prm"idc underground and surfacc tracklcss
trolle," sen"ice from downtown Boston to thc South
Boston Piers area. Duties include dirccting the multiplc
teams designing systemwide elements and the vehicle
maintenance facility for this projcct, while coordinating
this work with ongoing design and construction (by
others) of transil\vay tunnels and stations and adjacent
roadways.
. The systemwide work includes design and
construction phase services for:
. Emergency tunnel ventilation;
. Signals, communications, tunnel lighting, and
emergency fan controls;
. Traction powcr and ovcrhcad catcnary for thc
vehicles;
. A 1.25-mile underground 13.8 kV power line serving
the project from an cxisting MBTA switching station.
I SHAW ENVIRONMENTAL, INC.
o;;C122006T
. Dutics include coordinating multiple disciplincs and
subconsultants to cxecute a comprehensi'T projcct
scopc for the maintenance facility on an accelerated
"fast track" schcdule, including:
. Gcotechnical and environmental site im'cstigations,
including borings
. Site topographic sUlTey for design and to support
propcrty acqUIsItiOn;
. Needs definition and facility programming;
. Conceptual and schcmatic design;
. Sitc environmental remediation plans;
. Preliminary and Final Design (Industrial,
Ci,'il/ Utilities, Gcotcchnical, Em'ironmcntal,
Architectural, l'vIechanical, Elcctrical, Structural and
Landscape Architecturc); and
. Construction Phase Engineer Support Sel'\.ices
Project Engineer/Lead Civil Engineer, 345KV
Transmission Reliability Project, NST AR Electric
& Gas Co, Boston, MA, 07/2004 - 10/2005. SCl'\"cd
as Project Enginccr and Lead Civil Engineer for thc final
coordination and prcparation of bid documcnts for a
project consisting of the installation of thrce new 3-+5 kV
underground transmission lines employing pipc-typc
cablc undcr approximately 16 milcs of roadways through
suburban and dcnsely populated urban arcas in thc
metro Boston arca. The projcct included construction
of a ncw switchyard at thc point of origin and the
expansion of l\vo othcr substations at the termination
points. i\ third substation had a heat cxchanger installed
as part of the projcct scope.
Deputy Project Manager, Anderson Regional
Transportation Center, Massachusetts Port
Authority, Woburn, MA, 08/1997 - 06/1998. Served
as Dcputy Project l'vIanager, leading a seven-firm team in
the planning and design of a new intermodal
transportation center at the Indus triplex site in \Voburn,
1\L-\. The facility combines t-.Iassport Logan Express,
l\IBT A commuter rail, and park-and-ride facilities for
t-.Iassport, rvlBT f\ and l\lassHighway on a single site.
The site included a multilevel parking structure.
Constmction of a new multifunction station building,
commuter rail platforms, reconfiguration of the existing
track and signal system and of the access and site
roadway systcms, establishment of safe and cOlwenicnt
pedestrian travel patterns and effective parking revenuc
collection and control are among the key elements of the
JOHN W FINIK D
.
-'
<(
(f)
o
0.
o
'"
0.
(f)
I
....
u.
o
w
to
<(
0.
":J
....
>=
w
I
....
Z
o
Z
o
>=
u
"'
....
(f)
W
'"
W
I
....
o
....
.~
(f)
~
....
W
W
I
(f)
(f)
I
....
z
o
o
w
z
;:;:
....
z
o
u
<(
....
<(
o
u.
o
w
'"
::>
(f)
3
u
(f)
Ci
'"
o
w
(f)
::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
project. In addition to management duties, coordinated
the preparation of the project's Preliminary Design
Report and m"ersaw the preliminary platform, rail and
signals design efforts.
Project Manager & Engineering Technical
Manager, Engineering Design Review Consultant -
190/193 Project Impacts, , Massachusetts Turnpike
Authority (MTA), Boston, MA, 09/1995 -12/1997.
As Project 1\[anager and Engineering and Design
Technicall\Ianager of this task order contract, led a Joint
Venture and a 12-firm subconsultant team in reviewing
impacts of 1-90/[-93 Central Artery Tunnel Project
construction on existing turnpike facilities and
operations, as well as functioning as the owner's
engineer relative to the future takem"er of the completed
C;\/T facilities by the Turnpike. Tasks fell into the
general areas of Engineering/Design/Construction
Support; Startup /T es ting/Turnover Support; 0&1\ [
Support; Special SeLyices; Safety Sen"ices; and
En\"ironmental Sen"ices.
Deputy Project Manager & Project Civil-Structural
Engineer, Engineering Consulting Services for
Construction Assistance - Phases I & II, ,
Massachusetts Bay Transportation Authority,
Boston, MA, 06/1989 - 03/1999. SerYed as Deputy
Project r.lanager and also as the project Ci\.il-Structural
Engineer for a multidiscipline Engincering Consulting
Sen"ices Contract w'ith the MBTA. Assisted Stone and
\\'cbster's Project r.lanager by prm"iding technical and
administrative direction; coordinating cngincering,
schedule, and budget control; cluality rcviews of
engineering products; and managing subconsultant
sen"ices, all on task-order basis (more than 100 task
orders were authorized). Supen"ised or assisted in the
preparation of a number of engineering products,
including:
I SHAW ENVIRONMENTAL, INC.
06C122006T
Civil-Structural Engineer, Maintenance Facility
Planning and Design, Various, Various, 01/1989-
12/1993. Responsible for a wide variety of tasks for a
numbcr of maintenance facility projccts for light rail
\"ehiclcs, buses, and highway department \"ehiclcs. Tasks
included needs analyses, site selcction, facility
programming and space allocation analysis, master
planning, and facility layout and design. Elements of
these projects included civil! site design, architectural
and structural engineering, facility arrangements, and
selection of mcchanical systems and special equipment.
Functional elemcnts of the facilities included site
circulation, \'Chicle storage, \'Chicle maintenancc and/ or
repair, parts storage, and administrative and support
areas. Projects includcd:
. Greater Cle\'Cland Rcgional Transit ,\uthority - New
5th District Garage
. Town of Barnstable, r.[assachusetts - Vehicle
r.[aintenance Facility Design
. Town of Plymouth, r.lassachusetts - DP\\'
r. laintcnancc Facility
. l\mT;\ - Lechmcre Green Line l\,laintenance Facilit\.
JOHN W FINIK GJ
.
-'
<<
(/)
o
0.
o
'"
0.
(/)
I
I-
U.
o
w
<!l
<<
0.
~
I-
;:::
W
I
I-
Z
o
Z
o
;:::
()
ii:
l-
(/)
W
'"
W
I
I-
o
I-
ei
(/)
~
I-
W
W
I
(/)
(/)
I
I-
Z
o
o
w
z
::;:
I-
Z
o
()
<<
I-
<<
o
u.
o
w
'"
::>
(/)
g
()
(/)
o
'"
o
w
(/)
::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
James A. Geihsler, P.E.
Civil Engineering
Education
1\LS., Civil and Elwironmental Engincering, University
of New Orleans, 1999
B.S., Agricultural Engineering, University of Florida,
1997
Registrations
Professional Engincer: Ci\.il, L\
Background Summary
1\[r. Geihslcr is a rcgistered Civil Enginccr with Shaw
Coastal, [nc (SCI). Prior to his \vork with SC[, he was
employcd at a civil engineering firm in New Orleans and
prO\'ided professional consulting selyices to numerous
public and private clients throughout the Gulf Coast
region for m'er 6 years. His areas of expertise include
municipal, railroad, and roadway design, as \vell as watcr
resources and wastewater engineering. Mr. Geihsler
holds a 1\L S. in Ci\.il and Environmental Engineering
and a B. S. in Agricultural Enginecring. At the
Uni\'ersity of Florida, he conccntrated in bio-process
engineering and biological waste treatment. At the
Uni\'ersity of New Orleans, he completcd a M.S. degree
w'ith a concentration in hydraulics and hydrology
including use of S\'\]\[r,[ and UNET models.
Relevant Experience
1997 - Present, Civil Engineer, Shaw
Environmental & Infrastructure, Inc.
Project Manager for Ward 7 Levee Project,
Terrebonne Levee and Conservation District-
Project consists of Engineering, Design, preparation of
plans and specs and Construction Management for
approximately 10 miles of levee rcconstruction and
improvements for flood protection in Terrebonne
Parish, Louisiana.
Project Engineer Corps of Engineers West Bank
River Levee- Nairn to Empire- Preparation of
Stability Report and Plans for raising the Nairn to
Empire Hurricane Protection levee including
modifications to the levee alignment, right-of-way
drawings, plans and specifications and cost estimates.
SHAW ENVIRONMENTAL, INC.
06C122006T
Project Engineer for S&WB of New Orleans
Projects: -Upgrades to Sewer Pump Station No. 17,
23, New Michoud Blvd. Sewer Force Main, and
Upgrades to West Bank Treatment Plant - Prepared
Design Rcports and Preliminary Drawings for projects
awaiting final appronl after Hurricane Katrina. The lift
station upgrades include new wet wells, new pumps,
discharge piping and force main. Lift station tasks
include development of pump system curves, selection
of pumps, preliminary drawings and specifications.
Treatment Plant tasks include preparation of preliminary
plans for sc!ection of new sodium hypochlorite metering
systcm and belt press.
Project Engineer for City of Gretna Projects - Raw
Water River Intake System -Phased rcnovation and
installation of new pumps and discharge piping of thc
city's sole intake system while maintaining operation;
Sizing and sc!cction of ne\v pumps, preparation of
design dra\vings and spccifications and O\'ersight
through construction. \'\'ater Tower Replacement -
Prcparation of plans and specifications for demolition
and remO\'al of an anticlllatcd water tower and
rcplaccment with new 2.50,000 gallon watcr to\ver, and
o\'crsigh t through cons truction.
Gulf Coast High Speed Rail Corridor - Ongoing
study to identify improvements including sidings and
turnouts neccssary to increase capacity in multi-state rail
corridor. Preparation of cost estimates and conceptual
le\'c! imprO\Tmcnts.
Unwatering the City of New Orleans, Post-Katrina-
Tracked existing and temporary pump capacity,
identified \vater sheds, and project timeframcs for
dewatering the areas of New Orleans East and St.
Bernard Parish
Project Engineer for New Orleans Museum of Art
Sculpture Garden - As part of development of outdoor
sculpture garden, prepared drawings and specifications
for site work consisting of utilities, paving, drainage, and
alignment of the historic amusement train, and oversight
through construction.
JAMES A. GEIHSLER, P.E.
e
.,j
<(
<J)
o
a.
o
0::
a.
<J)
r
>-
u.
o
w
to
<(
a.
~
>-
>=
w
r
>-
z
o
z
o
>=
u
DO
>-
<J)
w
0::
w
r
>-
o
>-
ei
<J)
~
>-
w
w
r
<J)
<J)
r
>-
z
o
o
w
z
<(
>-
z
o
u
<(
>-
<(
o
u.
o
W
0::
=>
<J)
g
u
<J)
o
0::
o
W
<J)
=>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Eric W. Johnston, P.E.
Why Selected as Key Personnel for Contract
. Developed computer programs to determine
live load forces
. Nearly 30 years experience on large infrastructure
design projects
Education
B.S., Civil Engincering, Southeastern University of
0.[assachusetts, 1977
Postgraduate Studies, Structural Engineering, Old
Dominion Uni\'ersity
Registrations
Professional Engineer: Structural, FL, GA, MA, VT
Professional Engineer: Ci\'il, cr, 0.L\
Background Summary
i\[r. Johnston has ovcr 29 ~Tars of cxpericnce in thc
engineering industry. He \vas assigned to infrastmcturc
projects in 1992. Currently, as a Senior Lead Stmctural
Engineer is responsible for i\[assachusctts lligl1\va~'
Department (MI-[D) bridge projects, and design of
expanded polystyrene (EPS) block filled structures along
with the constmction phasc scrvices for the [-90/[-93
Southbound Interchange Project. Thc l\Il-[D bridgc
projects include the rating of stcel truss bridges; rating of
a three hinged steel arch bridge, the rating of four
concrete arch bridges and the design of a through girder
bridge over the Boston and 0.[aine
(B&l\f)/0.[assachusetts Bay Transit [\uthority (0.nrL\)
railroad superstructure rcplacement.
He was responsible for the bridge elemcnts of the
Vermont Agency of Transportation (VTrans)
Engineering Services Contract and design of a 120 ft
steel through girder bridge and the transition picr for the
railroad spur over the Tehuacana Creek, as part of the
TXU Electric, Big Brown Steam Elcctric Station Rail
Spur.
He was responsible for supervising the final design of 12
miscellaneous bridges including the design of six multi-
span prestressed, precast, concrctc bulb-tee stringer
bridges ranging from 90 ft to 440 ft long for the [-90/1-
93 Southbound Interchange Project. He was, also,
responsible for the design of numerous tcmporary
bridges for this project including the superstructure
dcsign of 20 span, 1800 ft long composite concretc-filled
steel grid deck and girder \'iaduct and for the
construction phasc sC1Tices for this \'iaduct.
He was also responsible for the design of Albany Street
and Ramp Q interchange steel box girder bridge and
developing the interchange structural geometry for
concrete transitions between surface roadway and
tunnel.
[\s a Senior Structural Engineer, he \vas responsiblc for
the development of a computcr program that dctennines
the livc load force in thc truss members of a bridge for
standard AASHTO and i\[assachusetts-specific truck
loads, including truck trains. This program is used in the
rating of bridges.
i\lr. Johnston has been responsible for the de\'elopmcnt
of thc design criteria, geometry, and preliminary dcsign
aspects of the Personal Rapid Transit Test Track
Guideway. He has been responsible for the schematic
design alignment and \'ehiclc geomctrics of the i\lBT.\
South Boston/Fort Point Channel Transitway Projcct, a
1.5-mile underground, articulated trollcy bus
transportatlon systcm.
0.11'. Johnston has been a Cost Account l\Ianager for
several nuclear plant facilities. As a Cost I\ccount
i\[anager, he is responsible for the schcduling of work,
engineering, and the design cost of the facilities that he
manages. He has also becn an Assistant Lead Enginecr
on a nuclear project.
He has performcd \'arious types of dynamic analysis
including e(luivalent static, response spectra, and elasto-
plastic impact analysis. These analyzes ha\'e been
performed for several nuclear power plant projects.
These analyzes range from sub-system building analysis
to commodities (cable tray and conduit) support
systems, to hazard analysis (including the effects of high-
energy pipe breaks and tornado missile on building
stmctures).
He has been responsiblc for thc design and evaluation of
many types of stcel structures, including the design of
support systems for conduit and cable trays, work
SHAW ENVIRONMENTAL. INC.
ERIC W JOHNSTON
06C 122006 T
e
-'
-<
rJJ
a
ll.
a
'"
ll.
rJJ
I
f-
u.
a
UJ
'"
-<
ll.
~
f-
;::
UJ
I
f-
Z
a
z
a
;::
u
ir
f-
rJJ
UJ
'"
UJ
I
f-
a
f-
ei
rJJ
'!l
f-
UJ
UJ
I
rJJ
rJJ
I
f-
Z
a
o
UJ
z
:;c
f-
Z
a
u
-<
f-
-<
o
u.
a
UJ
'"
::>
rJJ
g
U
rJJ
o
'"
a
UJ
rJJ
::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
platforms, and miscellaneous lifting beams and rigs. He
has been responsible for the evaluation of crane
construction installation; television studio lighting
support grid, and evaluation and specification of
restorations for a 1923 ele\"ated water tower considered a
local historical landmark. He has also been responsible
for the design of several steel buildings ranging in size
and complexity for a nuclear power plant project.
Relevant Experience
01/1998 - Present, Senior Lead Structural
Engineer, Shaw Environmental &
Infrastructure, Inc.
Responsible for the bridges, depressed highway sections,
miscellaneous supporting stmctures, and the design of
expanded polystyrenc (EPS) block filled structures.
Responsibilitics also include project management,
providing construction support services for client
projects, business de\"elopment and prcparing technical
portions of design engineering and constmction support
proposals.
The following is a summary of key projects:
Project Manager & Senior Lead Structural
Engineer, 1-90/1-93 Interchange 1-93 Southbound,
Central Artery/Tunnel (CA/T) Project,
Massachusetts Highway Department, Boston, MA,
$16,682,709.25, 11/1993 - Present. As a Task
Leader/Senior Lcad Structural Engineer, hc is
responsible for the construction phasc scrviccs of 10
miscellaneous bridges, six depressed highway sections
(boats), transition structures, and temporary bridges
along with a stormwater pumphouse for the
I\[assachusetts Highway Department associated \vith
Constmction Contracts C09C I, C09C4 and C09C2 of
the Central Artery/Tunnel Project. He is also
responsible for the design of eight expanded polystyrene
(EPS) block filled structures, ranging from 90 fcet to 450
feet long. A zero balance method is used to determine
the amount of EPS for each stmcture. The EPS is
designed to withstand all vertical loads and lateral loads,
including wind and seismic.
1-\S a Task Leader/Senior Lead Structural Engineer, he
was responsible for supervising the final design of 12
miscellaneous bridges and transition structures for the
Massachusetts Highway Department associated with
I SHAW ENVIRONMENTAL, INC.
06C122006T
Design Contract D009C of the Central Artery Project.
\,rork includes:
The design of six multi-span bulb-tee, prestressed,
precast concrete stringer bridges ranging from 90 ft to
440 ft long.
1. Developing the structural geometry for those
portions of the interchange that transition between
surface roachvay and tunnels. These concrete
transitions follow the roadway geometry, both
horizontally and \"ertically, including superelevations
to provide a structure with safety walks, and earth
retaining walls. The complexity of these structures
range from a single ramp to two mainline ramps and
five merging ramps.
2. Design of the Albany Street and Ramp Q
interchange bridge \vhich combines a 2-lane city
street and a \vide I-lane interchange ramp. The
geometry of this 2-span bridge includes 2 diverging,
diametrically opposing cllLTed horizontal alignments
resulting in a common span to the north and 2
separate spans to the south that form a "Y" in plan.
Three designs were developed, a cast-in-place
postensioned concrete box girder superstructure, a
steel box girder with a dapped end superstructure
and a stcel tloor beam superstructure. The tloor
beam superstructure was constructed.
3. The design of eight expanded polystyrene (EPS)
block filled structures, ranging from 90 foot to 450
foot long. A zero balance method is used to
determine the amount of EPS for each structure.
The EPS is desif:,rned to \vithstand all \"erticalloads
and lateral loads, including wind and seismic.
He was responsible for the design of numerous
temporary bridges for this project, including the
superstructure design of the Interim Viaduct of Albany
Street (IV AS). This is a 20-span, approximately 1800-ft-
long viaduct with spans that range from 53 ft to 104 ft.
[t is a steel girder, concrete filled, steel deck composite
design. .Also, was responsible for constmction phase
services for this viaduct.
Accomplishments:
Developed and produced 100% drawings for IV AS in a
span of 10 weeks from Notice to Proceed (NTP) that
resulted in less than 1% contractor claims against the
$12-million construction budget.
ERIC W JOHNSTON D
.
..;
..
m
o
0-
o
0:
0-
m
I
l-
lL
o
W
'"
..
0-
~
I-
~
W
I
I-
Z
o
Z
o
~
u
ii'
?-
m
w
0:
W
I
I-
o
I-
.~
m
~
I-
W
W
I
m
m
I
I-
Z
o
o
w
z
;;'
I-
Z
o
u
..
I-
..
o
lL
o
W
0:
=>
m
g
u
m
o
0:
o
w
m
=>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
A wards/ Client Commendations:
BLS\V Responsiveness, Dated August 29, 1996
C-\/T Performance Recognition, dated October I, 1997
Project Manager & Senior Lead Structural
Engineer, General Engineering Services, Various,
Vermont Agency of Transportation (VTrans),
Various locations in Vermont, 11/1999 -12/2005. As
Project Manager/Senior Lead Structural Engineer, is
responsible for two bridge deck replacements. The
bridge projects are: the final design of a 375 ft., 5 span,
2-lane steel girder bridge for US 5 over r 91 located in
Hartland, Vermont, and the preliminalT design of a 331
ft.,4 span, 2-lane steel girder bridge for US 5 over r 91
located in Putney Vermont. Both projects require the
complete replacement of the deck while maintaining
traffic across the bridge, reuse of the superstructure
steel, and the reduction in the number of expansion
joints ill the deck
:\ccomplishments:
O\Trall Consultant Performance Evaluation Rating of
Excellent for both the llartland and Putney projects.
SHAW ENVIRONMENTAL, INC.
ERIC W. JOHNSTON
3
06C122006T
e
ei
(f)
~
f-
W
W
I
(f)
(f)
I
f-
Z
o
o
w
z
;;'
f-
Z
o
(,)
..
f-
..
o
U-
o
W
0::
::J
(f)
g
(,)
(f)
is
0::
o
W
(f)
::J
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Eric K. Kramer, P.E.
Education
B.S., Ci,'il Engineering, University of South Florida,
1990
Registrations
Professional Engineer: AL, FL
Background Summary
-'
..
(f)
o
a.
o
0::
a.
(f)
I
f-
u-
o
w
l!l
..
a.
~
f-
;::
W
I
f-
Z
o
z
o
;::
(,)
ii'
f-
(f)
W
0::
W
I
f-
o
f-
~[r. Kramer is a registered profcssional enginccr with 1 (i
ycars of progressi\'e expcrience in cngineering design,
construction oversight and project management of
em'ironmental and ci,'il projects. I-[is project
participation has included performance of field tasks, as
\vell as ovcrall project planning and scheduling that
accomplish project goals within schedule and budget.
He has the knowledge and expcrience to apply
innO\'ati,'e remedial and im"estigati,'c technologies to
reduce project costs, while exceeding project goals. [\[r.
Kramcr is a prm'en hands-on cngineer that can asscss a
difficult situation, communicate with a client and
regulatory agency to deri\'e a mutual acceptable solution.
[-Ie has taken projects from the initial ill\'estigatin: stage
through development of a project exit strategy
consistent with the client's goals. 1\Ir. [varner's project
experience includes all aspects of remedial assessment,
design and cons truction. ,\s a senior enginecr he has
formulated remedial strategies for numerous sites,
written design documents and supen'ised thc
cons tructlOn.
Relevant Experience
OS/2003 - Present, Engineer 4, Shaw
Environmental, Inc.
Contract Manager for FDOT District III: As
Contract 1\[anager for FOOT District [Il, 1\1r. Kramer
supelTiscs all aspects of environmcntal work pcrformed
for this contract. 1\[r. Kramer has supervised the
completion of asbestos sutTeys for 83 bridges in the
district, as well as several structures. In addition, he has
managed the removal of three l2,OOO-gallon
underground storage tanks (USTs) in support of
roadway construction and coordinated petroleum-
contaminated soil screening and disposal in support of
new utility construction.
SHAW ENVIRONMENTAL. INC.
06C122006T
Program Manager; Private Retail Client: 1\[r. Ivamer
supen"ises compliance permit re,'icw for a nationwide
retail client that has stores throughout the United States.
In this role he manages a staff of approximately 20
personnel that re,"iew proposed remodels to the stores
and e,'aluates the remodel elements ,vith respect to
federal, state, and local permit relluirements. 1\[r.
Ivamer provides overall management of this $1\[ per
year program including technical guidance, regulatory
coordination and architect design recommendations.
08/2001 - OS/2003, Senior Engineer,
ARCADIS, North Palm Beach, FL
Project Manager/Engineer, Petroleum-Impacted
Sites: Mr. Ivamer assumed project manager/ engineer
responsibilities for numerous petroleum impact sites in
1\[iami-Dade, 13roward, Palm Beach, Orange, Bay,
1\[artin and Escambia Countics for private owners and
State assigned sites. \\'orking with the responsible party
he devised a cost effective remedial strategics that
provided timely cleanup, while minimizing impact to
operating businesses. 1\[r. lvamer employed remedial
strategies such as air sparge concurrent with \"acuum
extraction, direct oxidation through injection wells,
Natural ,\ ttenua tion l\ [onitoring and biosparging.
Project Engineer, FDEP DryCleaner Program: 1\[r.
Kramer worked as project engincer for se\"Cral State Dry
Cleaner Program sites. He formulated remedial
strategies consisting of enhanced reducti,'e
dechlorination for sites ,vhere the groundwater ,vas
impacted by chlorinated sokents, and "acuum extraction
and surgical exca,"ation for sites impacted in the
unsaturated soil zone. His practical approach reduced
remedial costs, while effecti,'ely cleaning up the sites.
I-Ie wrote the remedial action plans, supen'ised their
implementation and documented site acti,'ities in
periodic monitoring reports.
10/1998 - 08/2001, District Environmental
Manager/Project Manager, PSI, Inc"
Riviera Beach, FL
Project Manager/Engineer; Talisman Sugar Farm
Assessment and Remediation, Belle Glade, FL: 1\lr.
[varner served as project manager and engineer for the
investigative and remedial phase of several Everglade
sugar farms. Mr. Ivamer coordinated material,
ERIC K. KRAMER, P.E.
.
-'
0<
rn
o
"-
o
a::
"-
rn
I
>-
~
w
'"
0<
"-
':J
>-
>=
W
I
>-
Z
o
z
o
>=
u
ir
>-
<f)
w
a::
w
I
>-
o
>-
.~
rn
!Q
>-
w
W
I
<f)
<f)
I
>-
z
o
o
w
z
:;:
>-
z
o
U
0<
>-
0<
o
u.
o
w
a::
=>
rn
g
u
rn
o
a::
o
w
rn
=>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
manpower and the analytical aspects for the assessment
of over 20 sugar farms as part of the Everglades Forever
Act. Once assessment activities were completed, ~Ir.
Kramer formulatcd a remedial strategy that \vould allow
the state to grant a SRCO. Contaminants of Concern at
the sitcs included arscnic, chromium, Icad, pctroleum
hydrocarbons and pesticides. All farms were assessed
and remediated within the proposed schedule and
budget.
04/1996 - 10/1998, Project
Manager/Engineer, OHM Remediation
Services Corp., Clermont, FL
Project Engineer Downtown Orlando Chlorinated
Solvent Project: Project engineer for the constmction
of a soh-ent remediation s\'stem in dO\vntO\vn Orlando.
Responsibilities included development/ certification of a
~IOT, roadway replacement design and construction,
coordination with FOOT & City of Orlando,
supetTising and dirccting 4,000 fcct of dircctional
drilling, procurement of a below grade railroad crossing
pcrmit, ,'ault layout and constmction, pipe fusing,
equipment selection and procurement and system layout.
Coordinated all drilling activities and utility conflicts.
Pcrformed systcm operational testing, which includcd
PLC controlled VFD pump and motors, air strippcr
modification and startup testing.
Project Manager/Engineer, FDOT Sites,
Jacksonville, FL: ~Ir. Kramcr sctTed as projcct
manager and engineer for petroleum-impacted sites in
the FOOT 2 right of way. He designed remedial
systems that incorporated groundwater recovery, air
sparge injcction/vacuum extraction, HOPE barrier liner
installation, horizontal rccovery wells and bio-piles. He
supelTised construction of remedial systems and wrote
RAPs summarizing the remedial design and supervised
constmction of the remedial systems. Mr. Kramer's
work for the District also includes general civil
construction work, which was used during the
demolition of the Duvall Street Bridge.
Project Manager/Engineer, FDOT District I
EMO: tvIr. Kramer was responsible for identifying
potential environmental impacts to roadway activities.
Once potential impacts to roadway work were identified,
Mr. Kramer formulated an investigative plan and
coordinated implementation of the work. During his
work for FOOT District I work he has successfully
removed numerous underground storage tanks, designed
and implemented remedial strategies that mitigated
impact to roadway construction acti,'itics installcd piping
and rcplaced pa,'cment. As project manager he cithcr
wrote or revicwed reports documcnting thc work
whether investigative or remedial in nature. As a
registered professional engineer Mr. 1vamcr confers
with the FDEP or local environmental regulatory agency
as needed to ensure environmcntal activities will not
create future liabilities for the District at a later date. Mr.
Kramcr's practical approach to soh'ing complcx
cnvironmental impacts to road,vay constmction rcduces
costs, while providing solutions.
Project Manager/Engineer; FDOT District VII:
r.1ost of the work pcrformed by r.1r. Ivamer in this
District was in a high population density area with
residcntial ncighborhoods nearby the impacted arca.
This fact created ne\v challenges associated \vith
formulating and implementing a remedial strategy. [n
addition to standard dewatering and impacted soil
exca,'ation, r.1r. Ivamer employed dircctional drilling,
wastc solidification and disposal, and rcmedial dcsign
based on groundwater modcling of the contractor
dewatering systcm to achie,'e the District's goals. r.1r.
Kramer also performed regulatory coordination of thc
cnvironmental aspects of the Districts road\vay work. [n
addition, r.[r. Kramer wrote and/ or revie\ved all reports
and documentation regarding site illYestigati,'e and
remedial acti,.ities, which was forwarded to the FDEP
and local county environmental regulatory programs
when appropriate.
Project Engineer; Morris Road Landfill,
Jacksonville: ~1r. lvamer provided engineering
support for the construction of a groundwater
remediation system. The remedial system included
groundwater recovery wells, controls, water treatment
system, connection to sanitary pipe for discharge, as well
as detcntion pone\. This project required considerable
planning and engineering due to the site topography,
proximity of residential development and length of
piping. During construction of the remedial system Mr.
1vamcr interfaced with local, state and client
representatives to permit the proposed construction and
maintain good lines of communication.
SHAW ENVIRONMENTAL, INC.
2
ERIC K. KRAMER, P.E.
06C122006T
e
-'
'"
lI)
a
Cl.
a
0::
Cl.
lI)
I
>-
u.
o
w
'"
'"
Cl.
~
>-
>=
W
I
>-
Z
a
z
a
>=
u
a:
>-
lI)
w
0::
w
I
>-
a
>-
ei
lI)
'!?
>-
w
W
I
lI)
lI)
I
>-
z
o
'"
w
Z
;C
>-
z
a
u
'"
>-
'"
'"
u.
o
W
0::
:::l
lI)
g
u
lI)
o
0::
a
w
lI)
:::l
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
03/1994 - 04/1996, Lead
Engineer/Project Manager, Groundwater
Technology, Inc., Pensacola, FL
Project Manager/Project Engineer; Gulf Power
Remedial Project, Panama City Florida: I\[r. Kramer
served as project manager and engineer for a
groundwater and soil remedial system constructed at the
Panama City Gulf Power Plant. The remedial system
incorporated an innovati\'e steam injection, groundwater
recovery and vapor extraction systems. Although the
remedial system was designed by others, I\fr. Kramer
recognized the system could be down-sized \vithout
sacrificing operation capability, which saved the client
approximately $200,000 over the proposed construction
costs. Mr. Kramer managed this project, as well as
performing engineering oversight, report documentation
and as-built drawing certification. The project was
completed on schedule and within budget.
Project Engineer, Petroleum-Impacted Sites (North
Florida): I\Ir. Kramer setTed as project engineer for the
design and implementation of a remedial strategy to
cleanup petroleum-impacted sites for Escambia/Santa
Rosa Counties. His duties included pilot testing, design,
reporting, construction and operation and maintenance
of numerous petroleum-impacted sites. Remedial
strategies consisted of air sparge injection, \'acuum
extraction, groundwater reco\'eIT, soil exca\'ation,
bioaugmentation, oxidation, fixation and solidification
and stabilization. During the design process 0.fr. Kramer
would calculate friction losses, piping alignment and
sizing, selection of pumps, blowers and compressors,
fate and transport modeling, infiltration gallery design,
roadway replacement design and NPDES and other
permit preparation. As the engineer of record he would
supervise the remedial system construction and once
completed prepared and sealed Record Drawings. He
also supervised all engineering aspects of these projects
including preparation of bid documents, conduct bid
meetings, bid review, contractor selection, supetTise
construction and permitting. Once the remedial system
became operational Mr. Kramer would supen'ise the
system operation and maintenance activities, trouble
shooting and prepare reports documenting site activities
which were submitted to the regulatory agencies for
approval.
SHAW ENVIRONMENTAL, INC.
MC 122006T
10/1990 - 03/1994, Engineer/Project
Manager, Law Companies, Tampa, FL
Project Engineer; JSC Jacksonville Landfill: Mr.
Kramer was the project engineer for design of a new
Class I landfill for the JSC Corporation. I\[r. Kramer
assisted \vith the site selection, cell sizing and permitting
for the landfill. He designed multiple cells including the
side slopes, liner and geotextile selection, leachate
collection system, stormwater management system,
weigh system and ingress/ egress roadways. Several
computer software applications \vere utilized to evaluate
leachate formation, stormwater routing and detention
pond sizing. Mr. Kramer formulated a geotechnical
testing program to ensure the existing soil mechanics
\vere adec]uate for landfill construction. He also assisted
in the hydrogeologic testing of thc aCluifer, so that a
groundwater monitoring program could be implementcd
that met the FDEP rcquirements. I\[r. Kramer also
formulatcd the construction bid documents. I\lr.
Kramer completed the scopc of work on schedule and
under budgct.
Project Engineer; East Pasco Landfill, Pasco
County: I\h'. Kramcr provided construction O\'ersight
for the closure of a Class I County landfill. The county
landfill closure design specificd placement of a clay cap
and \Tgetati\"c O\'erburden. I\[r. Kramer O\'ersaw the
clay pit selection and certification, QA/QC testing for
pcrmcability and physical parameters, and
documentation of construction methods. During
closure acti\"ities it \vas discO\"ered that previous
assessment was not complete and the waste extended
beyond the cap limits. Mr. Kramer performed additional
assessment to detcrmine the extcnts of waste, and
designed and permitted a modification to the cap which
cxtcnded over the new waste boundary. Upon
completion of the cap, Mr. Kramer prepared a
construction report documenting closure activities and
issued Record drawings. I\1r. [vamer completed the
scope of work on schedule and under budget.
ERIC K. KRAMER, P.E.
3
e
..;
<(
<J)
a
a.
a
Q:
a.
<J)
I
f-
u.
a
w
'-"
<(
a.
~
f-
>=
W
I
f-
Z
a
z
a
>=
u
ii:
f-
<J)
W
Q:
W
I
f-
a
f-
ei
<J)
'!1
f-
W
W
I
<J)
<J)
I
f-
Z
a
o
w
z
;;:
f-
Z
a
u
<(
f-
<(
o
u.
a
w
Q:
::J
<J)
a
..J
u
<J)
o
Q:
a
w
<J)
::J
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Stephen T. LaMonica. P.E.
Education
1'\I.S., University of Pittsburgh, 1983
1\I.B.:\., Suffolk Uninrsity, 1981
B.E., Ci\.il Engineering, Northeastern University, 1980
Reg istrations
Land Surveyor: 1'\1.-\, 1'\[E
Professional Engineer: 1\L-\, 1'\rE, TX
Title Y System Inspector, 1\1.\
Background Summary
1\Ir. La1\Ionica joined Shaw E & I (Stone & \'(Iebster) in
September 1979 as a Senior Drafter in the Structural
Division and was successively promoted to his present
position of Lead Senior Ci\.il Engineer in the
Infrastructure Group. Currently he is in\"(>!ved in the
project managemcnt and design of various ci\.il
engineering projects. His cxperience includes site
de\'elopment and real estate transactions for industrial
clients, military bases and commcrcial and private real
estate \"etlturcs.
He has 30 years of progressive experience in civil
engineering profession for project management and
design. In his current assignment as a Project Engineer
he is responsible for thc planning, design and
construction coordination acting as the owner's cngineer
of a multi-discipline multi-tlrm team.
Mr. La1'\Ionica's experience on civil engineering projects
includes:
. The analysis of storm water run-off for pre-
construction and post-construction conditions for
multiple storm frequencies and the design of storm
water systems including detention and retention
facilities.
. The analysis and design of sanitary sewerage systems
for municipalities and commercial applications.
. The analysis and design of parking facilities for
maximizing capacity and eftlciency including the
traftlc flow and storm drainage.
. Corridor alignment projects for railroads, highwars
and utilities such as electric and gas transmission lines.
This experience includes analysis optimizing routing,
SHAW ENVIRONMENTAL. INC.
06C1220061
real estate costs and aC(luisition and em'ironmental
permtlt1l1g.
. Experience in the profession of land surveying. This
includes the supervision and execution of boundary
surveys, residential and commercial subdivisions,
topographic and mapping slllTeys and em'ironmental
permitting and layout slllTeys for utility design and
cons tructlon.
. Experience in property deed and title research, deed
development and easement takings including the
development of plans to be recorded at the registry of
deeds.
. Development of plans for certitlcation by the Land
Court of the Commonwealth of 1'\Iassachusetts.
. Experience in construction management as a Resident
Engineer on municipal projects. These projects
include storm drain, sanitary sewer and water
distribution utilities.
. Experience as a Resident Engineer on airport runway
and utility construction.
. Involvement in the de\'elopmcnt of databases used
for the design of \"arious mapping and ci\.il
enginccring projects utilizing automated design and
i\1'\Ij Fl\l-G IS applications.
In addition to civil enginecring projects his experience
also includes analysis, design, detailing and checking of
stcel and reinforced concrete structures of the types used
for nuclear and fossil fueled power plants. He is also
familiar with many structural computer analysis
programs.
Prior to his S\,\'EC affiliation as a registered professional
engineer and registered land surveyor l\Ir. La1'\Ionica was
im'olved with a \'ariet:y of civil engineering and land
slllTeying projects for \vell-known consulting
engineering tlrms.
He was a supervisor at Eastern Land Survey Associates
and a Project 1'\Ianager at BSC Engineering.
Relevant Experience
01/1986- Present, Project Manager,
Shaw Environmental & Infrastructure, Inc.
. [\s Senior Lead Ci\.il Engineer, Infrastructure Group,
he is responsible for the project management and
design of many civil engineering and mapping projects
utilizing automated design applications. This
experience includes the supervision of the preparation
of contract drawings and specifications, schedules and
cost estimates by multi-disciple multi-firm design
STEPHEN T. LAMONICA
e
-'
..
(J)
o
a.
o
'"
a.
(J)
I
>-
u.
o
w
'"
..
a.
~
>-
>=
w
I
>-
Z
o
Z
o
>=
u
ii:
>-
(J)
W
'"
W
I
>-
o
>-
ei
(J)
!!l
>-
w
W
I
(J)
(J)
I
>-
z
o
Cl
w
z
;;:
>-
z
o
u
..
>-
..
Cl
u.
o
w
'"
OJ
(J)
g
u
(J)
Ci
'"
o
w
(J)
OJ
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
teams. He also has extensive experience in the
coordination of projects with client and owner staffs
and the responsibility for contractor coordination.
. As Intergraph Registered Consultant in G.LS. and
mapping, responsible for designing G.LS. systems for
clients utilizing t--.IGE/t--.IGA software in addition to
client training.
. As Intergraph Registered Consultant in A.E.C.
products, he is responsible for in house and client
training and software support and development for
the automated civil design software InRoads.
. t--.Iicro-station and VAX-based Intergraph CAD
systems were utilized for G IS, tax mapping, utility
route design, site design, and other ci\"il/structural
projects using [ntergraph software such as LG.D.S.,
INROADS and A.P.O.P., as well as other computer
graphics capabilities such as ,\utoC,\D and IBt--.I
CADAt--.lj CATL\.
The following is a summary of key projects:
Project Manager, Big Brown Steam Electric Station,
TXU Electric Company, Fairfield, TX, 07/2000-
Present. As a Project t--.[anager he was responsible for
the preliminary engineering and routing of a 30 mile
railroad to supply coal to B.B.S.E.S. The project
included interface with consultants for permitting land
sU1Teying and R.O.\". acquisition and client interface.
He facilitated the de\"elopment of cost estimates with
cJuantity de\'elopment of the proposed railroad.
. Project t--. [anager duties included a multidiscipline
design coordinating corporate engineering resources
in order to complete the engineering design including;
hydraulic analysis, drainage and culvert design,
highway design and relocation, right-of-way
requirements and acquisition, public information
meetings, railroad operations evaluations, railroad
design, bridge design and coal unloading structure
design. Duties also included bid package creation of
contract dra\vings and specifications, pre-bid
conference, bid review and analysis, procurement
services and construction management support.
Project Engineer, Silver Line Vehicle Maintenance
Facility, Massachusetts Bay Transportation
Authority, Boston, MA, 04/2001- 09/2005. As a
Project Engineer, was responsible for the design and
engineering of the Silver line maintenance facility. The
maintenance facility was developed to maintain and store
76 60-foot articulated buses. The facility will service
SHAW ENVIRONMENTAL, INC.
06C122006T
dual mode (diesel and electric) and Compressed Natural
Gas (CNG) buses. The construction schedule for the
maintenance facility was compressed due to vehicle
delivery. [n order to minimize the construction duration
the project was let in two contracts; one for site, utility
and roadwork and the second for the remainder of the
facility and equipment procurement.
Project Engineer, Yucca Mountain Project Railway
System, Yucca Mountain, Yucca Mountain, 04/2000
- 06/2000. As a Project Engineer he was responsible
for the evaluation and analysis of the Yucca t--.Iountain
railway system to document and recommend resolutions
for operational and maintenance issues.
Project Engineer, Big Brown Steam Electric
Station, TXU Electric Company, Fairfie[d, TX,
01/1995 - 04/2001. As a Project Engineer he was
responsible for the preliminary engineering and routing
of a 30 mile railroad to supply coal to B.B.S.E.S. The
project included interface with consultants for
permitting land sUlTeying and R.O.\\!. accJuisition and
client interface. He facilitated the development of cost
estimates with lJuantity de\'elopment of the proposed
railroad.
Senior Civil Engineer, Monticello Steam Electric
Station, TXU E[ectric Company, Mt. Pleasant, TX,
01/1995 - 09/1995. As a Senior Civil Engineer he was
responsible for the design and engineering of a I ~()()
railroad interchange to supply coal to t--.LS.E.S. He was
coordinated field and support engineering and land
surveying activities for the condensed project schedule.
He was responsible for interfacing with client and
railroad engineering staffs for project execution.
Civil Engineer, Hansom Air Force Base, United
States Air Force, Lexington, MA, 02/1994 - 01/1995.
As a Civil Engineer he was responsible for the design,
application and maintenance of a base-wide ,\t--.ljFM-
G IS project for the design of various civil engineering
projects for base improvements. These duties included
the coordination of data input from base information,
including geodetic control.
Senior Engineer, Dover, City of Dover, Dover, NH,
02/1991- 12/1991. As a Senior Engineer he was
responsible for the design and implementation of a
multidisciplinary municipal GIS for the City of Dover,
STEPHEN T. LAMONICA
2
e
-"
<<
U)
a
a.
a
'"
a.
U)
I
f-
...
a
w
"
<<
a.
~
f-
;::
W
I
f-
Z
a
z
a
;::
u
(i'
f-
U)
W
'"
W
I
f-
a
f-
ei
U)
'!?
f-
W
W
I
U)
U)
I
f-
Z
a
o
w
z
;;:
f-
Z
a
u
<<
f-
<<
o
...
a
w
'"
::>
U)
g
u
U)
o
'"
a
w
U)
::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
New Hampshire. The project included denloping
work-flO\vs for the incorporation of data from various
sources into the G IS. In addition he was responsible for
training city personnel in the use and updating of thc
G IS along with automatcd civil design software.
Structural Designer, Beaver Valley Power Station
Unit No.2, Duquesne Light Company, Project
Location, 07/1981- 04/1987. As Structural Designer
he was responsible for the documentation, maintenance
and design of calculations for the fuel and
decontamination building for the Duquesne Light
Company, Bea\'er Valley PO\ver Station - Unit 2. In
addition to concrete and steel design, responsibilities
included using computer analysis to design electrical
conduit supports and to determine the adequacy of
embedded steel plates subjected to support loadings.
01/1985 - 01/1986, Supervisor, Eastern
Land Survey Associates, Inc., Peabody,
MA
. As SupelTisor - Survey Departmcnt, responsibilities
included the following:
. Supcr\'isor of field and office sUr\'ey personnel
responsible for assigning and monitoring the
completion of work.
. Project r.[anager responsible for the completion of
\'arious civil engineering projects.
. Design of residential and commercial civil engineering
projects including roadway and drainage design.
. I\ttendance at mectings of regulatory authorities for
project review and apprrwal.
01/1979 - 01/1984, Project Engineer,
Stone & Webster, Stoughton, MA
Duquesne Light Company, Beaver Valley Power
Station - Unit 2 Guly 1981 to Jan 1983). \'(lorkcd as
Structural Designer in the Structural Group of thc site
engineering officc at Beavcr Valley Power Station - Unit
No.2, Shippingport, Pf\ for Ducluesne Light Company.
Responsibilities included steel and concrete design,
resolving structural interferences with other disciplines,
handling contractor's quality controls re(luests for
information, electrical conduit support design, drafting
production, and general site engincering responsibilities.
During l\Iarch and April of 1983, on loan to work for
the Houston Lighting & Power Company designing
drainage and other structures for the l\Ialakoff Power
Station.
Virginia Electric Power Company Gan 1981-July
1981). Worked as Designer attached to the task force
evaluating masonry block walls for Virginia Electric
Power Company's North Anna and Surry Power Plants.
Responsibilities included using computer analysis to
determine the ade(luacy of masonry block walls and
remodeling inade(luate ones.
DuringJune of 1983, on loan to \vork for the Virginia
Electric Power Company at their Chesterfield Power
Station during a pO\ver outage. Responsibilities included
engineering support for the replacement of a damaged
boiler column.
Azzawiya Oil Refining Company (Dec 1079 to Jan
1981). \\'orked as Designer in thc Structural Group for
the ,\zzawiya Oil Refining Company, [nc., Ethylene
Project at Ras Lanuf, Libya. Responsibilities included
steel and concrete design and drafting production.
Indianapolis Power and Light Company (Sept 1979
to Dec 1979). Worked as Senior Draftsman in the
Concrete Group of the Structural Division for the
Indianapolis Power & Light Company, Petersburg
Station - Unit No.4.
SHAW ENVIRONMENTAL, INC.
STEPHEN T. LAMONICA 3
06C122006T
e
..;
<(
U'J
o
a.
o
a::
a.
U'J
I
>-
"-
o
UJ
Cl
<(
a.
"j
>-
>=
UJ
J:
>-
Z
o
z
o
>=
u
"'
>-
U'J
UJ
a::
UJ
J:
>-
o
>-
ei
U'J
!Q
>-
UJ
UJ
J:
U'J
U'J
I
>-
z
o
o
UJ
z
;;:
>-
z
o
u
<(
>-
<(
o
"-
o
UJ
a::
:::>
U'J
g
U
U'J
o
a::
o
UJ
U'J
:::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Eileen M. London
Education
t\LS., Urban Affairs, Boston Uni,'CrsitT, 1989
B.S., Em'ironmental Design, Uni,'ersity of
t\lassachusetts, 1981
Background Summary
[\[s. London is a Senior Lead Environmental Scientist
with over 27 ycars cxperience in resolving regulatory
issues and managing multi-disciplinary environmental
projects. t\[s. London has extensi,'c expericnce in
environmental planning/ permitting/licensing,
em'ironmental impact asscssment and mitigation,
directing rcmediation projects, facility siting, and
construction management. Hcr management and
technical skills have been demonstrated on over 45
projects that include utility/transmission lines, highway
and roadway projects, energy (nuclear and fossil)
/industrial facilities, rcmediation sites, major wastcwater
treatment facilities, and water supply facilities.
During her career with Shaw, t\ls. London has served in
various capacities with increasing len~ls of management
responsibilities for projects invoking a wide range of
environmental issues, permitting and licensing
challenges, and multidisciplinary coordination efforts
during all phases of project completion including
planning, design and construction. She has prepared and
coordinated numerous environmental impact documents
(EA, EIS, FONSI, EIR, fSAR), permit and licensing
applications, and cnvironmcntal documcnts to support
construction activities for a ,'ariety of projects in
t\Iassachusetts, Nc,'ada, Minnesota, Virginia, \\'cst
Virginia, IO\va, etc.
Recently, t\[s. London managed and prepared the
environmental sections for two Independent fuel
Storage Installation (ISfSI) Certificates of Need in
Minnesota. These documents, one of which has been
approved, followed [\unnesota Rulcs. Shc also assisted
in the development of a scope and estimate for an Early
Site Permit Application for two new nuclear units at an
existing nuclear power station site and a study to
evaluate alternatives for supplying the future cooling
water needs of the proposed new units and the existing
plant. She also performcd a Siting Study for a
confidcntial client to site up to four new nuclcar units in
Texas.
t\ls. London has held key positions in planning,
permitting, conceptual design, and construction projects
in t\[assachusetts. She managed the preparation of
scveral volumes of the Facilities Plan, and was a member
of the transition team ,vhich successfully moved the
project from dcsign to construction. She completed an
eleven-year field assignment to Deer Island as the
l\utigation Compliancc Supervisor and Regulatory
Compliance t\lanagcr for the t\[assachusctts \'(Tater
Resources I\uthority's (M\\'RA) Boston Harbor Cleanup
Project. She also supervised appronl and renewal of
nearly 400 regulatory agcncy permits and licenscs
required to support the court-ordcred construction
schedule. She scoped and managed impact assessments
on several em'ironmcntally sensiti,'e project
components.
p,ls. London also recently, completed a permitting plan
and em'ironmental impact documents for a 345 kV
electric line in the Boston Area. As part of this project
she also de,'eloped an Em'ironmental J\lanagement
Construction Plan. Shc also complctcd an
Environmental .Assessment and FONSl for the Non
Stockpile systems Contract which addressed thc impacts
of constructing and operating a treatment systcm for DL
and QF Nutralent at a TSDF in Ne,'ada.
Ms. London has also managed three Remedial Action
Contracts (RAC) with the US Army Corps of
Engineers/NE Oi,'ision where she managed staff and
budgct for a TSC-\-compliant cleanup of a building that
will be convertcd into a museum. She has also prepared
an Operations and p,Iaintcnance Plan for a Supcrfund
Site in Massachusetts and prepared and managed the
preparation of closc out documcntation for several
remedial action contracts. She is currently managing the
operations and maintenance at a superfund site in
Massachusetts, which includes monitoring the site to
ensure the integrity of the capped landfill is maintained
and G\,(!, surface water sampling to track contamination.
In addition, l\[s London has managcd two CERCL\-
compliant Fivc- Year Reviews of superfund sites to
ensure remedies at the sites are functioning as intended.
\Vhich shc has managed includes preparation of a
SHAW ENVIRONMENTAL. INC.
EILEEN M. LONDON
06C 122006T
e
ei
V)
!!2
t-
UJ
UJ
I
V)
V)
I
t-
Z
o
o
UJ
z
4'
t-
Z
o
u
<<
t-
<<
o
"-
o
UJ
0::
::J
V)
g
u
V)
o
0::
o
UJ
V)
::J
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
CERCLA-compliant Five- Year Re\'iew at the site for
USEPA and Operation and Maintcnance of the sitc
under l\lassachusetts Department of Environmental
Protection.
...i
<<
V)
o
a.
o
0::
a.
V)
I
t-
"-
o
UJ
'"
<<
a.
UJ
-'
t-
t=
UJ
I
t-
Z
o
z
o
t=
u
ii'
t-
V)
UJ
0::
UJ
I
t-
o
t-
l\ls London also has extensivc experience in
em'ironmental compliance during construction and
construction management. On the Boston Harbor
Project, she directed Ci\I staff performing environmcntal
compliance inspections and permit monitoring, which
included NPDES rcporting, and noise, and traffic
monitoring to maintain compliancc with mitigation
agreements and pcrmit conditions. She was also
rcsponsible for verifying that construction contractors
were in compliance with contract requirements
pertaining to issues such as hazardous waste
management, noise, erosion and sedimentation control,
etc. Similarly, Ms. London managed the Environmental
Compliance Program for a water supply project
cncompassing 18 milcs of decp rock tunnel, ..J- major
shaft locations, se\'cral drop shaft locations and 2
co\'ered storage locations. Shc is currently managing the
cnvironmental compliance program for the North
Dorchester Bay CSO Projcct for thc l\lassachusetts
\,\'atcr Resourccs :\uthority.
Relevant Experience
01/1981 - Present, Lead Environmental
Scientist, Shaw Environmental &
Infrastructure, Inc.
Environmental Compliance Manager, North
Dorchester Bay CSO Tunnel, Massachusetts Water
Resources Authority, Dorchester, MA, 12/2005 -
Present. :\s Environmental Compliance Manager,
responsible for ensurc contractor compliance with all
cnvironmental permit conditions, regulations and
commitments for this SlOO million constmction project
which includes an 8,500-linear foot (If) long, 20-foot
diameter, precast lined soft-ground tunnel mincd with an
earth pressure balance machine (EPBl\f) undcr Boston
city streets. Work also includes the constmction of
seven cut and cover di\'ersion stmctures, a 100 million
gallons per day (mgd) pump station, an odor control
facility and the installation of approximately 5,625 If of
IO-inch diameter ductile iron cement mortar lined
(DICL) force main to be constmcted in tight urban
street and utility settings. Reviewed at 90%, 100% and
SHAW ENVIRONMENTAL, INC.
06Ct22006T
Bid Construction Specifications and prm'ided comments
to thc design engineer. Revicwcd and commented on
contractor submittals for materials handling, erosion and
sedimcntation control, noise, hazardous materials, storm
water, etc. Also responsiblc for managing thc
cnvironmental inspection staff and resoking all
em'ironmental non compliance issues.
Project Manager, Nyanza Chemical Waste Dump
Superfund Site, 111351, Massachusetts Department
of Environmental Protection, Ashland, MA, 10/2004
- Present. Coordinates quarterly inspection /
maintenancc and semi-annual grounchvatcr monitoring
activities at the Nyanza Chemical Waste Dump
Superfund Site to ensure that the Remedy at the site is
functioning as recluired. Each inspection includes
conducting routine maintenancc and recommendations
for repairs. :\n Inspection Report is prcpared and
submitted to MADEP for approval. Grouncl\\;ater
Sampling is conductcd on 16 \vclls and the terminal
manhole. Surfacc water sampling, scdimcnt sampling
and soil sampling arc also conducted periodically.
Samples are validatcd and a sampling report is prcparcd
for l\L\DEP review following each e\'ctlt. :\Iso managcs
long-tcrm wctland monitoring at the sitc to \'crify thc
functionality and cstablishmcnt of wetland arcas.
DRC Manager, Hurricane Rita Disaster Relief
Contract, FEMA, Liberty TX, 10/2005 - 10/2005.
l\Ianaged operations and logistics of thc Disaster
Rcgistration Center in Liberty Texas follmving Hurricanc
Rita. In coordination with FEMA, setup and managed a
mobile center which included Small Busincss
Administration, crisis counseling, and State of Texas
Emergency Rcsponse Team. Assistcd victims with
application processing, status follow up, ami other
disaster relief serviccs. Supervised and managed
temporary labor force; mobile living units for staff and
all equipment (computer banks, satellite phonc system,
trailer units, etc) and logistics for and demobilization of
the mobile unit. Interfaced effectively with Federal, state
and county emergcncy management personnel in the
daily operations of the unit. Provided reporting to Shaw
Houston Office f\lanagement Information Center and
FEMA documenting daily site activities, statistics, safety
issues and unit needs.
EILEEN M. LONDON
2
e
~
<(
(/)
a
Cl.
a
0::
Cl.
(/)
I
f-
u.
a
w
'"
<(
Cl.
':J
f-
;::
W
I
f-
Z
a
z
a
;::
u
ii'
f-
(/)
W
0::
W
I
f-
a
f-
ei
(/)
!!2
f-
W
W
I
(/)
(/)
I
f-
Z
a
D
w
Z
:,'
f-
Z
a
u
<(
f-
<(
D
u.
a
w
0::
:J
(/)
g
u
(/)
o
0::
a
w
(/)
:J
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Project Manager, Norwood PCBs Superfund Site
Five-Year Review, General Services Contract,
103091, U.S. Environmental Protection Agency,
Norwood, MA, 04/2004 - 01/2005. Pro\'ided client
technical support in conducting a CERCLA compliant
Five- Year Review for the site applying strict adherence
to OSWER Directive 9355.7-03B-P. Provided an
objective review of remedies at the sites and determined
the protectiveness of those remedies. The fi\'e-year
review comprises se\'eral tasks, which conclude \vith a
presentation of findings in a formal report. These tasks
include a document re\'iew, site inspection, interyiews,
re\'iew of ,\RARs, and preparation of a report. The
report discusses site history and background, remedial
actions at the site, progress at the site, the Five-year
re\'iew process, technical asscssment, issues found,
rccommendations, and concludes \vith a statement
determining whether the remedy is protectiye of human
health and the environment.
Lead Environmental Manager, Environmental
Licensing Services Regional 345kv System
Reliability, 100765, NSTAR Electric and Gas
Corporation, Boston, MA, 01/2003 - 08/2004.
Responsible for assisting and alkising clicnt in thc
selcction and licensing of a 345k\" clcctricallinc routc
and an alternati\'e routc for this fast track, fixed price
project. Prepared elwironmental comparison and
impact sections for the filing to the Energy Facilities
Siting Board and managed the deyelopment and
execution of the abutter list and public notice. Currently
managing and preparing portions of the Enyironmental
Impact Report. Also prepared the Elwironmental
i\Ianagement and Construction Plan that addressed the
many complicated aspects of construction in densely
de\'eloped urban areas including contaminated soils,
traffic, waste management, dewatering, noise, etc.
,-\dditionallicensing of the route included US ACOE,
\'('etlands NOrs, Chapter 91, and coastal zone
management. Also assisted in the preparation of
Construction Contract documents.
Environmental Compliance Manager, MetroWest
Water Supply Tunnel Project, Massachusetts Water
Resources Authority, Framingham, Massachusetts,
11/1998 - 12/2003. i\Ianaged the Environmental
Compliance Program for this major cost reimbursable
enginecring and remediation project that encompassed
18 miles of deep rock tunnel, 4 major shaft locations,
several drop shaft locations and 2 coyered storage
locations. Directed compliance monitoring and
inspection of all contracted work including noise
monitoring, NPDES sampling and permit condition
yerification; coordinated corrective action where
relluired; and provided monthly reports to document
compliance with permit and contract requirements.
Regulatory Compliance Manager and Mitigation
Compliance Supervisor, Boston Harbor Project --
Construction Management, Massachusetts Water
Resources Authority, Deer Island, MA 08/1990 -
07/2002. Oirectcd comprehensi\'c cngincering and
rcmcdiation serviccs on this $3.6B cost rcimbursable
contract to provide a ncw 1.3 EGO, secondary
wastcwatcr trcatment facility to i\letropolitan Boston.
Oirccted thc Ct\I staff and 85 general construction
contracts; and coordinatcd all project design acti\'itics, in
arcas related to em'ironmcntal compliancc and
implementation of regulatory agency requirements and
public outreach and also in areas of permitting,
hazardous matcrials management, regulatory analysis,
impact mitigation and sitc compliance monitoring,
inspection and reporting. Supen'ised appro\'al and
renewal of nearly 400 regulatory agency permits aClluired
to support thc court-ordered construction schedule.
Permit management utilized an integrated construction
scheduling and permit database software system.
l\Iaintained close coordination amongst project dcsign
firms, regulatory agencies and the owner. Managed
impact assessments and directed project consultants
performing environmental impact studies. To expedite
remediation of state-listed hazardous materials disposal
sites at seyeral project locations, she managcd a remedial
design consultant and coordinated all contractor
remedial actiyities and compliance inspections. I\lso
directcd rcgulatory rcyicw of all plans and specifications
at each stage of design, and was responsible for effecting
changes where ncedcd to conform the documents to
SHAW ENVIRONMENTAL. INC.
3
EILEEN M. LONDON
06C122006T
.
...i
<{
(f)
o
0-
o
0:
0-
(f)
I
>-
u.
o
w
'"
<{
0-
~
>-
>=
W
I
>-
Z
o
Z
o
>=
u
a:
>-
(f)
W
0:
W
I
>-
o
>-
.~
(f)
~
>-
W
W
I
(f)
(f)
I
>-
z
o
o
w
z
;;:
>-
z
o
u
<{
>-
<{
o
u.
o
W
0:
::>
(f)
o
-'
u
(f)
is
0:
o
W
(f)
::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
environmental permits, regulatory requirements and
mitigation commitments.
t\fanaged the preparation of all projcct technical
rcsponscs and tracks any corrective actions rcquircd to
comply with the technical consultants. Coordinated and
re\'iewed environmental studies and reports managed the
preparation of Environmental Impact Reports; projcct
change notices and other permitting documentation
required for environmentally-sensitive facility
components. Responsible for project status and
compliance reporting for cnvironmental and mitigation
non-compliance issues, and Regulatory Compliance
Department goals and objectives.
Lead Environmental Engineer, Interim Power
Supply, K Street Substation to Deer Island, Boston
Edison Company, Boston, MA, 10/1988 - 09/1990.
i\S Lead Environmcntal Scientist, responsible for
identifying and scheduling permitting requirements,
identifying cll\.ironmental constraints and managing the
preparation of permitting and licensing documentation
associated with the installation of a liS kV submarine
cable from K Street in South Boston, across Boston
Harbor to Deer Island for the construction and
operation of new secondary treatment facilities.
Prepared Scope of \\'ork and reviewed bids for sampling
and analysis of sediment and water quality during
construction. Prepared set of permit applications for
emergenc~' repair of the cable
SHAW ENVIRONMENTAL, INC.
EILEEN M. LONDON
4
06C122006T
e
-'
<i
en
o
a.
a
'"
a.
rn
I
f-
u.
a
w
'"
<i
a.
~
f-
>=
W
I
f-
Z
a
z
o
>=
()
0::
f-
rn
w
'"
W
I
f-
a
f-
ei
rn
'!!
f-
W
w
I
rn
en
I
f-
Z
o
a
w
z
;;:
f-
Z
a
()
<i
f-
<i
a
u.
a
w
'"
:::>
rn
g
()
rn
is
'"
a
w
rn
:::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Timothy J. Lynch, P.E.
Education
B.S., Ciyil Enginccring, Uni,'ersit:y of t\fassachusetts-
Lowcll, 197-1-
Graduate Courscs, Ciyil Engineering, Old Dominion
U niyersity
Graduate Courses, Ci,'il Engineering, Uniyersity of
Tennessee
Registrations
Professional Engincer: Ci,'il and Structural, DE, CT,
t\L\, t\[E, NC, NH, NY, OH, PA,SC TN, VT, District
of Columbia, and Puerto Rico
Licensed Construction Supen'isor: t\L\
Background Summary
t\[r. I,ynch is a Professional Engineer with more than 33
}'cars of engineering experience. I-Ie has been
responsiblc for the enginecring and design acti,'itics on a
",ide range of projects, including structural e,'aluations
and condition assessmcnts, seismic risk asscssments,
feasibility studies, conceptual design, detailed design,
,'alue engineering, peer reyie\v, constructability l'L','ie\vs,
demolition, and construction. Projects ha"e included
the assessment, design, modification and repair of
embassy buildings, office buildings, uniyersity buildings,
industrial buildings, courthouses, post offices, fire
stations, libraries, parking garages, ele\'atcd transit
systems, bridges, railroad equipment repair facilities,
higlnvay yehicle maintenance and repair facilities,
airports, nuclear power plants, fossil power plants,
hydroelectric stations, dams, transmission towers, and
water towers. International projects haye included work
in the Dominican Republic, Haiti, Panama, Pakistan,
Hungary, and the So,'iet Union.
He sen'ed on these projects in se,'eral capacitics, either
as Project Manager, Project Engineer (Technical Project
Lead), or Lead Structural Engineer. In addition to his
projcct work, he has sen'ed as a corporate specialist for
Shaw, performing technical reyiews and solving unusual
problems in design and construction.
In the fall of 2005, he was an active member of Shaw's
Hurricane Katrina Responsc Team, leading the
SHAW ENVIRONMENTAL, INC.
06C 122006T
enginecring assessment teams at the Stennis Space
Center and Keeslcr Air Force Base as well as prm'iding
structural assessments in New Orleans.
In addition to his dutics at Shaw, he has seryed as
Structural Spccialist and i\ltcrnate Planning Team
l\fanager for the FEMA l\L\TF-O 1 Urban Search and
Rescuc Team since 1993. This team of specialists, which
includes Caninc Search Specialists, Technical Search
Spccialists, Structural Specialists, Heavy Equipment
Specialists, l-lazmat/\'\1\[D Specialists, Emergency Care
Physicians, Paramedics, and Rcscuc Specialists rcsponds
to national disasters such as earthquakcs, hurricancs,
massi,'e explosions and terrorist attacks. As a Structural
Specialist, he sen'ed at the 1996 ,\tlanta Olympics, the
1999 \'('orcester Firc (12/3/99 thru 12/12/99), at the
collapse of the \'('orld Trade Center (9/ II /0 I thru
9/18/0 I), at the Braintree Fore River Shipyard building
collapsc and morc recently at the Dam'ers chemical
eXplosion. i\t the \'('orcester Fire, collapse of the \'('orld
Trade Centcr, Braintrce Fore Riyer Ship}'ard building
collapse and the Dam'ers chemical explosion he
provided structural assessments and structural m'ersight
for search and rescue operations and assisted other
Federal, state ancllocal agcncies. He recci,'ccl the Fire
l\fark Award from Liberty l\[utual for his actions at the
\'('orld Trade Center on 9/11.
Prior to joining Shaw, hc was an enginecr for the Federal
A\.iation i\dministration, where he was responsible for
the design, engineering, and construction of yarious new
and upgrade projects in the New England Region. He
also worked for the Tennessee Valley i\uthority in the
design of powcr plants and the Newport News
Shipbuilding and Dry Dock Company in the na"al
design and construction program.
Relevant Experience
03/1997 - Present, Senior Lead Structural
Engineer, Shaw Environmental &
Infrastructure, Inc.
Responsible for engineering and design actiyities and
construction support on a yariety of projects while
serying as either Project Manager, Project Engineer or
Lead Ciyil/Structural Engineer. Also responsible for
proyiding support to client projects and office staff as a
TIMOTHY J. LYNCH, P.E.
e
-'
..
(/)
o
a.
o
a:
a.
(/)
I
>-
u.
o
UJ
'-"
..
a.
~
>-
f=
UJ
I
>-
Z
o
Z
o
f=
()
~
(/)
UJ
a:
UJ
I
>-
o
>-
ei
(/)
!!!
>-
UJ
UJ
I
(/)
(/)
I
>-
z
o
o
UJ
z
;;:
>-
z
o
()
..
>-
..
o
u.
o
UJ
a:
::J
(/)
'3
()
(/)
o
a:
o
UJ
(/)
::J
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
tcchnical consultant and prm'iding support for busincss
dc\'elopmcnt.
Thc following is a summary of kcy projects:
Project Manager and Lead Structural Engineer,
Repair of Parking Garage, New York Power
Authority, White Plains, NY, OS/2004 - Present.
Rcsponsibilities includc the visual inspcction, tcsting,
assessment, monitoring, preparation of Contract
Documents, and the construction managemcnt for thc
rcpair of a six lc\'el, prccast concretc, parking garagc.
Consultant, Mixed Oxide Fuel Fabrication Facility,
U.S. Department of Energy, Savannah River Site in
Aiken, GA, 11/2003 - Present. Responsiblc for
pcrforming technical rc\.ic\vs of the structural dcsign and
prm'iding recommcndations for mccting projcct
objectivcs and rcgulatory rccluircments. ,\lso
rcsponsiblc for thc prcparation of an cmbcdmcnt dcsign
critcria and cmbcdmcnt spccification.
Consultant, Building 31, U.S. Army Corp of
Engineers, Linde Site in Tonawanda, NY, 06/2004 -
08/2004. Responsible for prm'iding conccptual designs
and comparati\'c cost cstimatcs for thc tcmporary
support of thc building foundation of a two story
masonry and stcel framc building during exca\'ation to
mitigatc radiological contaminatcd soil.
Consultant and Responsible Structural Engineer,
Demolition of Building 14, , U.S. Army Corp of
Engineers, Linde Site in Tonawanda, NY, 03/2003-
08/2004. Responsiblc for enluating an existing 172
foot by 182 foot, S..J- foot high, radio logically
contaminated building; preparing a dcmolition plan for
the surgical demolition of the building; and providing
structural oversight during thc demolition.
Consultant, NETL Report Identifying
Vulnerabilities and Technology Solutions, U.S.
Department of Energy, Pittsburg, Pennsylvania,
06/2004 - 06/2004. Prm'idcd cxpertisc on vulnerabilil\'
charactcristics of bridgcs and tunnels, mitigation
approachcs, and current needs of first respondcrs.
Consultant, Utility Tunnel Review, U.S. Army Corp
of Engineers, Linde Site in Tonawanda, NY,
09/2003 - 06/2004. Responsible for reviewing the
dcsign of a new precast concrcte utility tunnel, resolving
SHAW ENVIRONMENTAL, INC.
06C 112006 T
quality issues during fabrication of the prccast tunnel,
evaluating cracks and dctcrioration in thc cxisting utility
tunnels, and c\'aluating the effect of new hea\'y
cquipmcnt loads on thc cxisting tunnels.
Lead Civil/Structural Engineer, Eastchester
Extension Project, Iroquois Gas Transmission, NY,
OS/2002 - 06/2003. Responsiblc for dirccting and
supcrvising the civil, geotcchnical, and structural
enginecring for construction phasc serviccs for l\vo ncw
comprcssor stations and the modification of thrcc
eXlst1l1g comprcssor stations.
Lead Civil/Structural Engineer, Bronx Metering &
Regulating Station, Iroquois Gas Transmission
System, New York City, OS/2002 - 06/2003.
Responsiblc for dirccting and supelyising the ci,'il,
geotcchnical, and structural cnginccring for construction
phasc selyiccs for a ncw mctcring and rcgulating station
to scrvc Ncw York Cil\'.
Project Engineer and Lead Structural Engineer,
South Boston Piers Transitway (The Silver Line),
602053, Massachusetts Bay Transportation
Authority, Boston, MA, 09/1995 - 04/2002.
Responsiblc for managing and dirccting Sha\v's acti,'ities
and subconsultant activities in pcrforming cnginccring
and dcsign for a ncw bus maintcnance facility. The
facility includcs a Fueling Building, a Buswash and
Dcgrcasc Building, i\laintcnancc Building,
Transportation Building, Parking Garagc, surfacc and
cmbcdded vchiclc lifts, a dynomometer, cranes, parts
handling cquipment, and dicsel and CNG fucling
facilitics. Thc facility is dcsigned to maintain and fuel
both 60 foot articulated duel modc (elcctric and dicsel)
and CNG buscs.
Project Engineer and Lead Structural Engineer,
Tren Urbano (Transitway in Sanjuan, Puerto Rico),
ICA-Miramar Metro San Juan/Tren Urbano
Authority, Bayamon, Puerto Rico, 09/1996 -
12/2003. Responsible for managing and dirccting Stonc
& Wcbster's acti\'itics for providing principal dcsign and
quality assurance sClyices for thc first alignment scction
of the S1-billion Trcn Urbano transit project. Stonc &
\Vebstcr was the principal consultant to lC,\ !\liramar
!\Ietro San Juan, the joint vcnturc of lCA Construction
Corporation of Mcxico and !\Iiramar Construction
TIMOTHY J. LYNCH, P.E.
2
e
..J
<(
U)
o
a.
o
'"
a.
U)
I
I-
U-
o
w
CJ
<(
a.
~
l-
e:
W
I
I-
Z
o
Z
o
e:
()
a:
I-
U)
W
'"
w
I
I-
o
I-
ei
U)
!Q
I-
W
W
I
U)
U)
I
I-
Z
o
'"
w
z
;;'
I-
Z
o
()
<(
I-
<(
'"
U-
o
w
'"
::>
U)
g
()
U)
is
'"
o
w
U)
::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Corporation of Puerto Rico responsible for the design
and construction of the $69-million Bayamon section of
the project. The Bayamon section comprises 2400
meters of elevated structures, plus 2 stations. The
project is one of the ftrst federally funded design/build
transit projects and is considered a demonstration
project for faster, more cost-effecti\'e infrastructure
project construction.
Accomplishments:
Stone & \\'ebster's innovative foundation design reduced
the cost of the project by S 1.5 million.
Consultant, Damage Assessment for Crane
Accident, Harquahala Generating Company,
Harquahala, AZ, 04/2002 - 06/2002. Responsible for
leading a team of engineers in performing a rapid
structural assessment to e\'aluate extensive damage to an
existing Turbine Building caused by a crane girder
dropped during a crane accident. The assessment
included an inspection of structural steel members,
connections, and foundations that could ha\T been
impacted by the accident, an engineering assessment of
issues identifted during the inspections, the identiftcation
of members to be replaced or repaired, and repair details
and/ or procedures for required repairs.
Lead Civil/Structural Engineer, Bronx Metering &
Regulating Station, Iroquois Gas Transmission
System, New York City, NY, 11/1999 - 04/2002.
Responsible for directing and supelTising the civil,
geotechnical, and structural engineering for the design of
a new metering and regulating station to setTe New
York City.
Lead Civil/Structural Engineer, Eastchester
Extension Project, Iroquois Gas Transmission
System, NY, 10/1999 - 04/2002. Responsible for
directing and supervising the civil, geotechnical, and
structural engineering for the design of two new
compressor stations and the modiftcation of three
. . .
extst1l1g compressor stations.
Project Engineer and Lead Structural Engineer,
South Boston Piers Transitway (The Silver Line),
602053, Massachusetts Bay Transportation
Authority, Boston, MA 09/1995 - 04/2002.
Responsible for managing and directing Shaw's activities
and subconsultant activities in performing engineering
and design for a new bus maintenance facility. The
facility includes a Fueling Building, a Buswash and
Degrease Building, l\laintenance Building,
Transportation Building, Parking Garage, surface and
embedded vehicle lifts, a dynomometer, cranes, parts
handling equipment, and diesel and CNG fueling
facilities. The facility is designed to maintain and fuel
both 60 foot articulated duel mode (electric and diesel)
and CNG buses.
Lead Civil/Structural Engineer, ALNG Plant
Modifications, Algonquin Liquified Natural Gas
Company, Providence, RI, 02/1999 - 11/1999.
Responsible for directing and supervising the ci\'il,
geotechnical, and structural engineering and design for
the siting allll installation of three new \'aporizers and a
new compressor statton.
Lead Structural Engineer, Demolition of Building
108, U.S. Army Corp of Engineers, Charlestown,
MA, 10/1998 - 08/1999. Responsible for directing and
supelTising structural engineering services for e\'aluating
the condition of Building 108 at the Charles town Na\'y
Yard, recommending demolition methodology, and for
determining shoring/ repairs needed to allow mitigation
of hazardous materials during demolition. The building
contained hazardous materials including asbestos and
lead and was Se\Trely deteriorated.
Lead Civil/Structural Engineer, Delaware City
Compressor Station, North Carolina Natural Gas
Company, Delaware, NC, 05/1998 - 05/1999.
Responsible for directing and supervising the ci\'il,
geotechnical, and structural engineering and design for
the siting and installation of an addition to an existing
compressor station.
Consultant, Terminal E Modernization,
Massachusetts Port Authority, Logan Airport,
Boston, MA, 11/1997 - 03/1999. Served as a member
of a value engineering team which identifted
approximately 522,000,000 in potential savings for the
S300,000,000 modernization project; led a team of
engineers that performed a constructability and claims
avoidance review of the design when it was
approximately 75% complete; and performed an
independent structural review of the ftnal design in
06C122006T
TIMOTHY J. LYNCH, P.E. 0
I SHAW ENVIRONMENTAL, INC.
e
...i
<(
CfJ
o
a.
o
c:t:
a.
CfJ
I
>-
u.
o
w
<9
<(
a.
~
>-
;::
W
I
>-
Z
o
Z
o
;::
u
ii'
>-
CfJ
W
c:t:
w
I
>-
a
>-
ei
CfJ
~
>-
w
W
I
CfJ
CfJ
I
>-
z
o
o
w
z
~
>-
z
a
u
<(
>-
<(
o
u.
o
w
c:t:
:::>
CfJ
g
U
CfJ
6
c:t:
a
w
CfJ
:::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
accordance with f\ppendix I of the ~Iassachusetts State
Building Code.
Consultant, Larsen Hall Investigation, Harvard
University, Cambridge, MA, 06/1998 - 11/1998.
Responsible for e\'aluating and recommending corrcctivc
action for unusual masonry conditions discO\'ered during
masonry repairs.
Project Manager and Lead Structural Engineer,
Garden Street Garage Structural Assessment,
Harvard University, Cambridge, MA, 05/1998-
11/1998. Responsiblc for managing and dirccting the
\'isual inspection, testing, assessment, and
recommendations for repair for a parking garage at 29
Gardcn Strcet. Limited testing was performed to assess
the existing concrcte comprcssivc strcngth, prescncc of
Alkali-Silica Reacti\'ity, and concentration of \,\iater
Soluble Chloride Ion in deteriorated areas.
Lead Civil/Structural Engineer, Metering and
Regulating Stations, Maritimes and Northeast
Pipelines, Maine and MA, 02/1998 - 11/1998.
Responsible for directing and supeLyising the civil and
structural cnginccring and design for the siting and
installation of tweh-e metering and regulating stations.
Lead Civil/Structural Engineer, Clayton
Compressor Station, North Carolina Natural Gas
Company, Clayton, NC, 02/1998 - 11/1998.
Responsible for directing and supen'ising the ci\'il and
structural engineering and design for the siting and
installation of a new compressor station.
,
SHAW ENVIRONMENTAL, INC.
TIMOTHY J. LYNCH. P.E.
4
06C122006T
e
-'
0<
UJ
o
0-
o
a::
0-
UJ
I
>-
u.
o
w
'"
0<
0-
W
-'
>-
;:::
W
I
>-
Z
o
Z
o
;:::
u
"'
>-
UJ
w
a::
w
I
>-
o
>-
ei
UJ
!!!
>-
w
W
I
UJ
UJ
I
>-
z
o
o
w
z
<i'
>-
z
o
U
0<
>-
0<
o
u.
o
w
a::
::J
UJ
g
U
UJ
Ci
a::
o
w
UJ
::J
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
William O. Martin, P.E.
Education
l\LE., Ciyil/Soill\lechanics and Foundation
Engineering, Cornell University, 1963
B.E., Ci\"il Engineering, Cornell Uni\"ersity, 1962
Registrations
Professional Engineer: CiYil, tvL-\, NY, W A
Background Summary
l\[r. l\Iartin is a professional engineer with m"er 35 years
in the area of soil mechanics and foundation
engineering. He deyelops subsurface exploration and
laboratory soil testing programs to define subsurface
conditions and engineering soil properties. He has
analyzed and de\"eloped design recommendations for
structure foundations, exca\"ations and earth strucnlres,
prepared specifications for earthwork, deep foundations,
rock anchors, \vaste settling basins, and other site-related
work.
l\[r. l\Iartin has been project Lcad Geotcchnical
Engineer on nuclear power projects, simple and
combined-cycle power plants, a pilot plant for
atmospheric tluidized bed combustion of coal, Fluc Gas
Desulphurization and Selecti\"c Catalytic Reduction
systems, and projects to reconvert oil-fired power plants
to coal firing. He has worked on projects ill\"oking
containment of licluid w'aste and disposal of solid waste,
and on a project that successfully remediated an
industrial site contaminated by PCBs (polychlorinated
biphenyls).
l\[r. l\[artin has also been Assistant Project Engineer and
Project Manager on a project to design systemwide
elements for an underground nllllle! for trackless trolley
service from downtown Boston to the South Boston
Piers area, now known as the Silver Line. As Project
Manager, he coordinated a team of consultants designing
traction power, catenary, communications, tunnel
lighting, emergency ventilation and a vehicle
maintenance facility. The budget for the design was
approximately S 12 million.
Relevant Experience
07/1973 - Present, Senior Principal
Geotechnical Engineer, Project Manager,
Shaw Environmental & Infrastructure, Inc.
\'('as Lead Geotechnical Engineer on projects to add
Fluc Gas Dcsulphurization and Selecti\"e Catalytic
Reduction systems at several existing fossil power plants,
and a project to develop a commercial real estate site.
Responsible for preparing scopes of work for subsurface
investigations and inteqJreting the results of the
investigations, performing analyses to determine
allowable bearing pressures and allmvable pile loads,
preparing spccifications for sitework and deep
foundations, and e\"aluating results of pile load tests.
Thc following is a summary of key projects:
Lead Geotechnical Engineer, Air Quality Control
System, Chalk Point Station, Units EI and E2.,
Mirant Mid-Atlantic, LLC, Aquasco, MD, 09/2006-
Present. Project includes a Selecti\"c Catalytic
Reduction (SCR) system and a Flue Gas
Desulphurization system.
,\cc{)mplishments:
Prepared specification for a subsurface im"estigation and
reviewed results of the ill\"estigation. Reviewed
specification for augered cast-in-place concrete piles.
Provided recommendations for micropiles to support
the SCR.
Lead Geotechnical Engineer, Air Quality Control
System, Morgantown Plant, Units FI and F2,
Mirant Mid-Atlantic, LLC, Newburg, MD, 09/2006
- Present. Project includes a Flue Gas
Desulphurization system.
Accomplishments:
Prepared specification for a subsurface investigation and
reviewed specification for augered cast-in-place concrete
piles.
SHAW ENVIRONMENTAL, INC.
WILLIAM 0_ MARTIN
06C 122006T
e
-'
<(
(fJ
a
a.
a
'"
a.
(fJ
I
I-
U.
a
w
'"
<(
a.
~
l-
f"
w
I
I-
Z
a
z
a
f"
u
1<
I-
(fJ
W
'"
W
I
I-
a
I-
ei
(fJ
!Q
I-
W
W
I
(fJ
(fJ
I
I-
Z
a
o
w
z
;;:
I-
Z
a
u
<(
I-
<(
o
u.
a
w
'"
::J
(fJ
'3
u
(fJ
o
'"
a
w
(fJ
::J
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Lead Geotechnical Engineer, Brandon Shores Units
1 & 2 FGD Retrofit, Constellation Energy Group,
LLC, Curtis Bay, Anne Arundel County, MD.,
07/2006 - Present. The Brandon Shores Units I & 2
FGD Retrofit includes tlue gas ducts, booster fans, tlue
gas desulfurization (FGD) system, chimney, reagent
preparation area, gypsum dewatering area, transformers,
\'arious tanks, limestone storage and gypsum storage
areas, and conveyors for limestone and gypsum. Also
included are waste water treatment, barge unloading, and
cons truction unloading areas.
Accomplishments:
Re\'ie\ved available subsurface information. Prepared
specification for subsurface investigation by a
subcontractor. Assigned laboratory soil tests, and
re\'iewed draft Geotechnical Data Report. Performed
settlement analysis and determined that major structures
could be supported on shallow foundations. Developed
recommendations for allowable bearing pressure.
Lead Geotechnical Engineer, Bridgeport Harbor
Station Unit 3 Mercury Control System, PSEG,
Bridgeport, CT, 03/2006 - Present. The ~[ercury
Control System includes a pulse-jet fabric tilter building,
acti\'ated carbon injection silo, tly ash silo, booster fam,
ductwork, and transformers. All major structures will be
supported on augered cast-in-place concrete piles.
i\ccomplishments:
Revie\ved a\'ailable subsurface information and
recommended locations of additional borings.
Performed calculations to determine seismic site class,
allowable pile load and (for booster fans) dynamic
stiffness of pile foundation. Prepared specification for
piles. Revie\ved specification for earthwork. \'\fitnessed
test pile installation at ash silo. Reviewed results of pile
load tests at PJ FF and ash silo. Visited site during pile
installation at ash silo, and recommended ways to
overcome pile installation problems at that location.
Lead Geotechnical Engineer, Brunner Island Unit 3
ESP & FGD Projects, Pennsylvania Power and
Light, York Haven, PA, OS/2005 - Present. Project
includes new precipitator sections, chimney, l\vo
absorbers, limestone preparation and gypsum dewatering
facilities, fans, various tanks, ductwork, conveyors, a
limestone unloading facility, and limestone and gypsum
stockpiles. All major structures will be supported on
augered cast-in-place concrete piles. The limestone and
gypsum stockpile areas are at the location of a former tly
ash disposal basin.
[\ccomplishments:
Developed specification for subsurface in\'Cstigation by
a subcontractor, assigned laboratory tests on soil and
rock samples, revie\ved draft Geotechnical Data Report,
evaluated soil properties, performed calculations to
determine allowable pile loads and (for booster fans)
dynamic stiffness of pile-supported foundation,
witnessed pile load tests at precipitator location, and
developed geotechnical design criteria. Evaluated
methods for providing lateral support of a deep
exca\'ation in loose, saturated tly ash.
Lead Geotechnical Engineer, Rochester, New
Hampshire Commercial Development, Mainely
Rochester Pizza, Rochester, NH, 04/2003 -
Present. Two restaurants and a car wash arc proposed
to be constructed at this site. Highlights include:
The site is a former landfill that is underlain by highly
compressible peat. \,\'ithout foundation treatment or the
use of deep foundations, structures would undergo
unacceptably large total and differential settlements.
After an initial e\'aluation, a pile foundation \vas
recommended because this would eliminate potential
settlement problems and \vould permit construction to
begin quickly. HO\vewr, the Client considered the cost
of a pile foundation to be excessive, and recjuestecl
additional alternati\'es is studied.
I t was determined that preloading with 10 ft of fill would
be effective, provided that at least 3 months were
available in the schedule. Settlements would be
monitored to determine when the preload could be
removed. The buildings would then be supported on
mat foundations.
Two of the building locations were preloaded for
approximately 6.5 months, resulting in approximately 18
inches of settlement at the middle of the preloads. The
preload material is to be shifted to the third building
location shortly.
SHAW ENVIRONMENTAL, INC.
2
WILLIAM O. MARTIN
06C122006T
.
...;
0<
'f)
o
a.
o
Ct:
a.
'f)
I
>-
u.
o
w
'"
0<
a.
~
>-
>=
w
I
>-
Z
o
Z
o
>=
c.>
ii:
>-
'f)
W
Ct:
W
I
>-
o
>-
.~
'f)
~
>-
W
W
I
'f)
'f)
I
>-
z
o
o
w
z
;;:
>-
z
o
c.>
0<
>-
0<
o
u.
o
w
Ct:
=>
'f)
g
c.>
'f)
o
Ct:
o
w
'f)
=>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Accomplishments:
De,"cloped initial recommendations for timber piles
(size, lcngth and capacity).
Performed settlement analyses to estimatc scttlcments
with and ,vithout preloading.
Prepared recommendations for preloading and for
settlement monitoring program. E,"aluated settlement
data and determined when the preloads could be
rcmo,"cd.
Lead Geotechnical Engineer, Brayton Point Flue
Gas Desulphurization and Selective Catalytic
Conversion Systems, PG&E National Energy
Group, Somerset, MA, 07/2002 - Present. The
project ,vill add a Selcctivc Catalytic Rcduction (SCR)
system to Units I and 3, and a Flue Gas
Desulphurization (FGD) systcm to Unit 3. ,:\n Ash
RcC(),"ery Process systcm \V.ill be added to process fly ash
and to storc it on site in a l6S ft diameter by 107 ft high
concrete dome. Project highlights included:
Large lateral and uplift loads on the SCR foundations.
Thesc loads wcre resistcd by high-capacity (mostly S()()-
kip), post-tcnsioned rock anchors installed to depths of
up to 86 ft.
The dome for fly ash storage is underlain by soft clay
that would cause the dome to settle excessi,'ek.
Recommended that the clay be excavated and replaccd
\vith compacted granular till.
Accomplishments:
Prepared scope of work for subsurfacc investigation at
the locations of the propos cd systems. Prepared reports
presenting results of borings and geotechnical laboratory
tests, and preliminary recommendations for foundations
and earthwork. Prepared specitlcation for SOO-kip rock
anchors, which were successfully installed and tested.
Preparcd eartlnvork specitlcation for the ARP system.
Lead Geotechnical Engineer, Medway Power
Station, Containment Dike for No.2 Fuel Oil
Storage Tanks, Excelon Power, Medway, MA,
06/2006 - 08/2008. During an extended period of
rainfall, water ponded to a depth of a couple of feet
within the containment dikc for two No.2 fuel oil
storage tanks. Seepage was noted along the base of part
SHAW ENVIRONMENTAL, INC.
06C122006T
of the exterior slope of the dike. A zone of dark soil
indicating a wet condition was obser;ed to extend
laterally beyond the zone of seepage. Client recluested
an assessment of the dike condition.
Accomplishments:
Visited the site to ,"iew the condition of the dike where
the seepage had been noted, and concluded that the
seepage posed no danger to the dike. Subsequently,
examined the entire dike and identified locations where
burrows had to be tilled and additional till placed to re-
establish the design cross section of the dike.
Lead Geotechnical Engineer, Marshall Steam
Station FGD Retrofit, Duke Energy, Terrell, NC,
02/2004 - 02/2005. Design and construction of a Flue
Gas Desulphurization System for Units 1--1-. Project
highligh ts include:
Residual soils of moderate compressibility and \"ariable
thickncss, undcrlain by partially weathcred rock that is
csscntially incomprcssiblc.
The thickness of residual soil varied from approximately
2 ft to 30 ft bcneath the location of thc U nit -I- Absorber
and thc southcrn part of the i\bsorber Building. This
would causc unacceptable differcntial settlcmcnt of thcse
structures.
This problem was addressed by m"er-exca,"ating (to
depths of up to IS ft) the thick sections of residual soil
at thcsc locations, and backftlling with compacted
crushed stone.
,\ccomplishments:
Prepared sketches showing where over-excavation and
back tilling with compacted crushed stone was required.
Performed settlement analysis of Limestone Preparation
Building to demonstrate that over-excavation was not
recJuired at that location. Provided input to a
specitlcation for drilled shaft foundations to support
ductwork, and to a specitlcation for a soil-nail wall for
the limestonc unloading facility.
Lead Geotechnical Engineer, Kendall Station
Repowering Project, Mirant Corporation,
Cambridge, MA, 02/2003 - OS/2004. A
Demineralized \'Vater Tank designed and constructed by
others was found to be out of plumb approximately two
WILLIAM O. MARTIN 3
.
..i
<(
(/)
o
"-
o
<t:
"-
(/)
I
I-
"-
o
w
"
<(
"-
W
..J
l-
e:
W
I
I-
Z
o
Z
o
e:
u
ii'
l-
(/)
W
<t:
W
I
I-
o
I-
.~
(/)
'!l
I-
W
W
I
(/)
(/)
I
I-
Z
o
o
w
z
;;'
I-
Z
o
u
<(
I-
<(
o
"-
o
W
<t:
='
(/)
g
u
(/)
Ci
<t:
o
w
(/)
='
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
\'ears after it was filled. The task was to e,'aluate the
potential for additional settlement and for any damage to
the tank, which is supported on a concrete mat.
Accomplishments:
Rc,'iewed a,'ailablc subsurfacc information and
settlemcnt data for the tank. Performed analysis to
estimate settlemcnt 20 years after the tank was filled.
Concluded that settlement across the mat would vary
approximately uniformly, and that the mild slopc of the
mat would not impair the functionality or thc structural
integrity of the tank.
Civil Engineer, Detailed Plan of Study for the Study
of Alternatives to the Panama Canal, Commission
for the Study of Alternatives to the Panama Canal,
Panama, 01/1990 - 06/1990. Stonc & \'('ebster was a
mcmber of a consortium prcparing a Detailed Plan of
Stud:' of i\ltcrnatives to the Panama Canal, for a tri-
national Study Commission.
;\ccomplishmcnts:
Prepared sections of thc study plan dcaling with
Engineering and Cost Estimates. Reviewed summary
dcscriptions of canal and noncanal alternatives, ,'isited
thc canal, dcscribcd how cngineering fcasibility would be
e,'aluated by the Consortium during prescrcening of
alternatives, and preparcd a Terms of Reference (scopc
of work) for studics by an Engincering and Cost
component contractor to evaluate the technical
fcasibility and cost of alternati,'cs which sUlTi,'c
prescreenmg.
Site Manager, Site Assessment for Sludge
Dewatering Project, New York City Department of
Environmental Protection, Jamaica, NY, 05/1989-
04/1990. Study to determine whether hazardous
materials were present at the location of proposed sludge
dewatering facilities at the Jamaica \'(rater Pollution
Control Plant.
Accomplishments:
Had O\'erall responsibility for site ill\'estigations that
included soil gas sampling, borings, installation of
groundwater monitoring wells, sampling of used drum
contents and chemical analysis of soil, groundwater and
drum contents. Prepared portions of interim report and
draft final report presenting the results of the site
assessment.
Project Manager, South Boston Piers Transitway
Project, Massachusetts Bay Transportation
Authority, Boston, MA, 01/1995 - 10/1998. Design of
systemwide elements for a project to provide
underground electric or dual-mode bus selTice from
South Station in downtown Boston to the South Boston
Piers area.
Accomplishments:
Directed a team of eight subconsultants. The work
accomplished included: GO perccnt design for emergency
tunnel ventilation; 90 percent design of communications,
tunncllighting, and emergency fan controls; 90 pcrccnt
design of traction power and catenary for the
undcrground route; 30 perccnt dcsign of the 'Thiclc
maintcnancc facility; 30 pcrcent design of an
undcrground station and section of line tunnel;
c,'aluation of an alternati,'C tunnel route for a Phasc 2
cxtension of the Transitway to mid-town, and
gcotechnical and em'ironmental im'estigations.
Assistant Project Engineer, South Boston Piers
Transitway Project, Massachusetts Bay
Transportation Authority, Boston, MA, 04/1998 -
07/2000. Site feasibility study and conceptual design of
a maintenance facility at Southampton Street.
Accomplishmcnts:
\X'ith the project Industrial Engineer, met with Client's
t\Ianager of Bus Operations to discuss criteria for the
maintcnance facility, including required functions, space
requirements, and sitc access. Re,'iewed alternative site
layouts and drafts of thc fcasibility and conceptual
design reports.
SHAW ENVIRONMENTAL, INC.
4
WILLIAM O. MARTIN
06C'22006T
e
...i
<{
<f)
o
a-
o
0:
a-
<f)
I
f-
u.
o
w
C>
<{
a-
':J
f-
;::
W
I
f-
Z
o
Z
o
;::
u
"'
f-
<f)
w
0:
w
I
f-
o
f-
ei
<f)
~
f-
W
w
I
<f)
<f)
I
f-
Z
o
o
w
z
;;'
f-
Z
o
u
<{
f-
<{
o
u.
o
W
0:
:::J
<f)
g
u
<f)
o
0:
o
w
<f)
:::J
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
James E. Martin, P.E.
Why Selected as Key Personnel for Contract
. Over 15 years experience conducting and
managing electrical and environmental projects
. Prepares Feasibility Studies, Contamination
Assessment Reports, Remedial Action Plans,
Removal Action Reports, and O&M Reports
Education
B.S., Electrical Engineering, Uni\"crsity of Central
Florida, 1991
Registrations
Professional Enginccr: FL
Electrical Contractor: FL
Background Summary
J\Ir. l\[artin has o\"er t S years experience in conducting
and managing electrical and environmental projects
including, design and pcrmitting, softwarc programming
and modeling, constmction and technical oversight,
operation and maintcnance (0&l\1), and financial and
field sClTices management.
He preparcs Feasibility Studies, Retluests for
Qualifications (RFQs), Contamination Assessment
Reports (C\RS), Remedial [\lternativcs E\"aluations
(RI\Es), Remedial [\ction Plans (R;\PS), Remm"al
Action Reports (RARs), Constmction Completion
Rcports (CCRs), and 0&[\[ Reports; supw:ises
Rcmcdial ,\ction Constructions (R;\Cs); and evaluates
0&[\[ data. By pro\"iding options for clients when
selccting passin full-scalc remedial alternati\'es, [\[r.
[\[artin has successfully performed multiple laboratory
bench scale studies and field pilot tcsts using enhanced
bio-stimulation, bio-augmentation, and chemical
oxidation technologies. As both a state-certificd
electrical contractor and a state-licensed professional
engineer, he is also extremely proficient in power
distribution design, conventional control relay logic
design, PLC programming, and remote systcm data
interfacing and monitoring using rcal-time software
telemetry units while specializing in identifying and
eliminating field related problems of complex electro-
I SHAW ENVIRONMENTAL, INC.
06CI22006T
mechanical equipment systems during integration,
operation, and start up activities.
[\[r. [\[artin has scrved as a team member on a t\vckc-
person panel sponsorcd by the [nterstatc Tcchnology
and Regulatory Council (rmC). The team consists of
state regulators and independent em"ironmental
consultants dedicated to bioremediation technology
research and de\"clopment.
Relevant Experience
2006 to Present, Program
Engineer/Environmental Consulting,
Shaw Environmental and Infrastructure,
Inc., Clermont, FL
BP / Amoco Corporation, Petroleum Contamination
Site Assessment and Remediation, Amoco #95
Hop-N-Save, Winter Haven, FL. Provided project
managcment, field supelTision, consulting selTices and
complete report gcneration for remcdial im"cstigations
including the site's assessmcnt, remedial action plan
(IL\P), RAP construction (Air Spargc SVE), O&l\[ and
associatcd fcasibility studies. Facility obtained a site
rehabilitation completion order (SRCO) recommending
no further action (Nh\) in 2000.
Florida Department of Environmental Protection,
Petroleum Contamination Site, State Cleanup
Program, AG Carriers, Leesburg, FL. Prepared
rcmedial design, cOllStmction management, and 0&[\[
services for a state-assigned petroleum contamination
site. Initiated startup of a nutrient enhanced
bioremediation system (EBS) in 2000 and obtained a site
rehabilitation completion order (SRCO) recommending
no further action (NFI\) and site closurc in 2004.
Florida Department of Environmental Protection,
Hazardous Waste Site Cleanup and Dry-cleaning
Solvent Cleanup Program Services, Dry-clean USA,
Ft Lauderdale, FL. Prepared Remedial Alternati\"es
Evaluation (RAE) for both soil and groundwater solvent
contamination. Performed multiple technology
screening efforts using site applicability,
implementability, reliability, adverse impacts, O&M
recluirements, estimated cleanup times and overall cost.
Recommended soil excavation and volatilization of soil
contaminants by vacuum extraction. The recommended
groundwater remediation was an in-situ bioremediation
JAMES E. MARTIN, P.E. Q
--
..;
<(
VJ
a
0.
a
oc
0.
VJ
r
>-
u..
a
w
"
<(
0.
~
>-
>=
W
I
>-
Z
a
z
a
>=
u
ii'
>-
VJ
W
oc
W
I
>-
a
>-
ei
VJ
'!?
>-
w
w
I
VJ
VJ
r
>-
z
a
o
w
z
4:
>-
z
a
u
<(
>-
<(
o
u..
a
w
oc
::J
VJ
a
..J
u
VJ
o
oc
a
w
VJ
::J
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
technology utilizing a series of microbial and nutrient
groundwater injections. Currently, a phased technology
approach is being successfully implemented to mitigate
an array of site halogenated volatile organic compounds.
Florida Department of Environmental Protection,
Post and Lumber Preserving Plant, Quincy, FL.
Prepared and assisted implementation of a remedial
action plan for this abandoned wood preserving facility
to address off-site wetlands remedial activities.
E\'aluated recommendations considering soil remm'al
and treatability of arsenic and dioxin using
phytoremediation. Phytoremediation pilot study was
performed jointly \vith FDEP, Universit:y of Florida and
Earth Tech. Bench scale treatability study was performed
using chemical oxidation process for PCP in
groundwater. i\S engineer of record, logistically planned
and executed the remonl of approximately 44,000 tons
of arsenic-and dioxin-contaminated soil from a
jurisdictional wetland area and residcntial properties
adjacent to the facility. Established no further action
(NF.\) with institutional controls, Risk Lcwl
t\[anagement Option II, per Chapter 62-780.680(2)
Florida "\dministrative Code (Fi\C).
The Pantry, Inc., Petroleum Contamination Site
Assessment and Remediation, Various Locations,
FL Project engineer responsible for site assessment,
pilot testing, and rcmedial dcsign at multiple petrolcum-
impacted sites. Remedial design included natural
attenuation e\'aluation by analyzing groundwater geo-
chemical parameters, soil vapor extraction, air sparging,
and multiphase extraction, bioremediation using
Biodyne, Redox Tcch, and PI-IOSter technologies.
J\lanaged multiple acti\'e remcdiation systems with full
financial responsibilitics including project rcporting,
operations and maintenance (O&J\Q, and treatment
system evaluation and optimization.
US Army Corps of Engineers -Omaha and Mobile
Districts, TERC 3, Remedial Actions, MacDill AFB,
FL. Provided project cngineering assistance including
design modification, operations and maintenance
(O&J\,Q, and trcatmcnt system optimization
recommendations for an air sparge soil vapor extraction
system located at the jet engine test cell (Site 26), a
groundwater dual phase extraction system with off-gas
catalytic oxidation at former fire training area (Site 23)
SHAW ENVIRONMENTAL, INC.
06C122006T
and fuel storage area (Site 38). E\'aluated all AFB active
treatment systems and pro\'ided engineering
recommendations to program engineers and technicians
for improving systcm opcrational run times and
performancc.
Kendall Healthcare, Magellan Project, DeLand, FL.
Prepared preliminary electrical design and capital cost
cstimates for a $ 12 million construction project
including a 61 ,OOO-square-foot expansion of an existing
manufacturing plant with injection molding machines
used in the production of spring guard syringes. The
pre- engineered building included 30.000 s(luare feet of
conditioned clean space for the injection molding
process, assembly and packaging. Design specifications
included restrooms, lockcr rooms, break area, electrical
rooms, mechanical rooms, gown rooms, offices, source
powcr, distribution power, auxiliary power, and a
mcchanical air handling system separate from the rest of
the plant.
Universal Studios, Inc., Lockheed Martin Launch
Test Area Electrical Design, Orlando, FL. Prepared
project electrical design including capital cost estimates
for a $3.S million former Launch Test "\rea remediation
project. Organized, scheduled, and participated in
electrical preliminary design meetings with clients and
subcontractors. Integrated new equipment process
control design to link \vith existing remedial treatment
system equipment while comparing conventional,
\vireless, and electro-optical technology benefits \vith
associated costs.
Florida Department of Environmental Protection,
Petroleum Contamination Site, State Cleanup
Program, Pensacola Terminal, Inc., Pensacola, FL.
Produced and implemented complete project e1cctrical
design including control logic software and program
development, electrical power re(juirements, process and
instrumentation documents for a S2.S million multiplc
(east and west compound) trcatment systems integration
including four 30 hp. air spargc compressors, three 20
hp. SVE blowers, three SOO standard cubic feet per
minutc (scfm) thermal catalytic oxidizers, ten existing
pneumatic dual phase product and groundwater recovery
well pumps. Responsible for all electrical installation,
equipment, and instrumentation approvals including the
JAMES E. MARTIN, P.E.
2
e
-'
..
(f)
a
Q.
a
c:t:
Q.
(f)
I
I-
"'-
a
w
<!J
..
Q.
~
I-
>=
W
I
I-
Z
a
z
a
>=
u
a::
I-
(f)
W
c:t:
W
I
I-
a
I-
ei
(f)
~
I-
W
W
I
(f)
(f)
I
I-
Z
a
o
w
z
;:;:
I-
Z
o
u
..
I-
..
o
"'-
a
w
c:t:
::>
(f)
'3
u
(f)
Ci
c:t:
o
w
(f)
::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
terminals- overall treatment systems start up, operations
and maintenance.
CSX Transportation Inc., Florida Department of
Environmental Protection, Petroleum
Contamination Site, Pre-approval Program,
Wildwood, FL. Senior Project Engineer for a 73 acre
site consisting of three active ]\[ulti-phase Extraction
(l\IPE) soil and groundwater treatment systems
operating concurrently to provide hydraulic control of
area free product. Project estimates indicate that over
850,000 gallons of free product have impacted
approximately 190,000 s(luare feet of the site. Currently
performing a site geophysical survey using global
positioning satellite (G PS) data for grid construction and
combining ground penetrating radar (G PR), electrical
resisti\"ity tomography (ERT), and terrain conducti\"ity
(E]\l3l) information to produce 3-0imensional sub-
surface maps (indicating free product locations) for
future design plans.
Roper Grower's and Associates, Florida Department
of Environmental Protection, Petroleum
Contamination Site, Pre-approval Program, Winter
Garden, FL. Prepared and implemented an innm'ati\'e
remedial design used to expedite the remm"al and
treatment of more than 15 tons of petroleum
contaminated soil. Using a remedial phased approach, a
biological surfactant (I3iosoh-e), oxygen enhancing form
of calcium peroxide (PermeOx Plus), and a microbial
blend of naturally occurring bacteria and fungi
(Environoc) \vere applied to site contaminated soil and
groundwater during various stages of source remm'al.
The project is currently in a Post Active Remedial
l\lonitoring (P 1\1\1\1) phase awaiting closure.
SHAW ENVIRONMENTAL, INC.
JAMES E. MARTIN, P.E.
3
06C122006T
~~":~~.: - - .:'.~.~,,~~2,::' ...:~ E. RESU~"ES- OF.KEY~PERSONNEC PRopcis-EDFoR'THls:coNTRAcT::t::::~::.:;t:~~-~::, ";.~'~,: :~~~
~::=:.., >>-".. . ~'"-'--. '. "~"-""","""_~,,,"~__~,~,,,-,, __~""_~."'J4J<........"'IoIo_~~~~_""""~~~..Y"'.n--.r"",,,;""''''''''l.'''I..''''.:..,.~.. ,- ~...... "I
(Complete one Section E for each key personF':;;::t;.~.::::.''." " .",,::'~-';':.~~ V" - " .' ::'
13. ROLE IN THIS CONTRACT
Technical Services Project Manager
14. YEARS OF EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
32 28
.. NAME
ruce M McCampbell, P.E.
15. FIRM NAME AND LOCATION (City and State)
Shaw Environmental, Inc., Miami Lakes, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
MS, Sanitary Engineering, University of Colorado, 1976
BS, Civil Engineering, University of Colorado, 1975
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Engineer, Sanitary, MA
Professional Engineer, Environmental, CO, FL
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards, etc.)
Mr. McCampbell has over 26 years of experience in various power and environmentally related engineering, construction and
permitting efforts. He has more than 16 years of experience managing diverse environmental and power projects ranging from small
one or two person assignments to large multi-tasked jobs with more than 50 personnel. He currently is a project manager on a $23
million fixed price EPC project to provide the US Army with a new White Phosphorus load line. He has been a Project Manager on a
project that reviews and tests new technologies for demilitarization of chemical warfare material. Recently he was assigned as a
Project Manager for several combined cycle plants and for the two Combined Cycle Reference Power Plants. In addition, he was
Project Manager for Owner Engineer assignments for several power industry clients. Another assignment was as the Project Manger
for a $24 million hazardous waste removal and restoration effort for the U.S. Army Corps of Engineers (USACE).
Mr. McCampbell has had extensive environmental engineering experience including designing a zero discharge pilot plant to
chemically treat chemical warfare agents to be in conformance with applicable federal and state regulations promulgated under the
Clean Air, Clean Water and Resource Conservation and Recovery Acts. He has determined the environmental constraints associated
with the demolition of a chemical warfare agent production facility and has conceptually determined methods for decontamination,
demolition, and disposal of the wastes that will be in compliance with applicable regulations. Mr. McCampbell has been responsible for
the process design of a 16.4 MGD wastewater treatment system, which treats acidic wastewaters from the production of nitrocellulose.
The design was based on results from pilot scale treatability studies performed under his direction.
Mr. McCampbell designed and obtained permitting of two FGD landfill efforts including landfill siting, phasing of the landfill operation,
storm water control, and economic evaluation of selling gypsum produced by the FGD system. He was responsible for obtaining the
ajor environmental permits for a green field site, nominal 2x400 MW unit pulverized coal-fired steam electric plant. Permitting
sponsibilities include obtaining a 404/Section 10 Permit, NPDES Permit, a Prevention of Significant Deterioration Air Permit which
included a Determination of Best Available Control Technology, Construction in the Floodway Permit, FAA Stack Permit, and a landfill
permit. To support these permitting efforts, responsibilities included: identifying wetlands and developing mitigation strategies,
developing a plant wide water balance, sampling the Ohio River, estimating and modeling plant air emissions including fugitive dust,
performing hydraulic analyses of construction impacts on the Ohio River, and designing a landfill including geologic and hydrogeologic
investigations of the proposed landfill site.
19. RELEVANT PROJECTS
1 TITLE AND LOCATION Cit and State
Non-Stockpile System Contract II, Product Manager for Non-
Stockpile Chemical Material, Various Locations
BRIEF DESCRIPTION Brief sco e, size. cost, etc. AND SPECIFIC ROLE
Project Manager/Task Manager - Responsible for the successful demilitarization of recovered 75 mm rounds that contained
a. compressed arsine gas using an innovative acid digestion process. Currently responsible for managing the Technology
Evaluation Task and for the Balance of Plant Design for a Wet Air Oxidation System installation that will be used to destroy Non-
Stockpile wastes. Also responsible for supporting the Program Manager in developing and managing bids for potential tasks
awarded under this Indefinite Delivery/Indefinite Ouantity (10/10) Government contract.
Accomplishments: Destroyed 3-75 mm Arsine containing munitions.
Awards/Client Commendations: Client commendation for destruction of 3-75 mm arsine rounds.
1 TITLE AND LOCATION Cit and State
Program & Integration Support III Technical Support Services,
Product Manager for Non-Stockpile Chemical Material, Various
Locations
b. BRIEF DESCRIPTION Brief sco e, size, cost, etc. AND SPECIFIC ROLE I!'l Check if ro.ect erformed with current firm
Task Manager/Senior Technical Support - Has been responsible for providing testing and review of potentially applicable
technologies to the Non-stockpile program. Responsibilities included review of a binary chemical neutralization technology testing
program and a wet air oxidation test program to destroy binary chemical neutralents. He was also responsible for a down select
report which will made recommendations for which mobile technologies to go forward with..
2 YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION If a
07/2002 - 12/2003
.
.
1 TITLE AND LOCATION cn and State
Indian Point Peaking Power Project, Entergy Wholesale Operations,
NY
c. BRIEF DESCRIPTION Brief sco e, size. cost, etc. AND SPECIFIC ROLE
As Task Manager, was responsible for the early engineering required to support final permitting of a two-unit simple cycled gas
fired power plant. Responsibilities included site arrangements, one lines, water balances, and schedule development.
Accomplishments: Supported client requirements in a cost effective and timely manner.
1 TITLE AND LOCATION Ci and State
Anderson, Kelley & Martin Station Combined Cycle Power Projects,
Florida Power & Light, FPL Energy, Alabama, South Carolina, FL
BRIEF DESCRIPTION Brief sco e, size, cost, etc. AND SPECIFIC ROLE
Project Manager - Was responsible for the early engineering required in support of the final permitting and ultimately
d. construction of these combined cycle power plants. The three plants all based on using GE frame 7F A technology include
Anderson, a two on one (two combustions turbines each with a HRSG feeding one steam turbine) arrangement with a simple
cycle temporary operation, Kelley, a 2-2 on 1 arrangement, and Martin, a 4 on 1 arrangement. Responsibilities included the
specification and early purchase of long lead time equipment including the heat recovery steam generators (HRSGs),
transformers, and cooling towers, site arrangements, one lines, water balances, schedule development, and cost development.
Accomplishments: Supported client requirements in a cost effective and timely manner.
(1) TITLE AND LOCATION (City and State)
Devons Landfill Remediation Project, , US Army Corps of
Engineers - New England District, MA
BRIEF DESCRIPTION Brief sco e, size, cost, etc. AND SPECIFIC ROLE
e. Project Manager - Was responsible for the remediation of six former disposal sites located at former Fort Devens including the
removal of wastes from the six sites, analyzing the wastes, and landfilling the removed waste in an on-site landfill constructed
under this task. Work completed under Mr. McCampbell's direction included development of the work plans, site safety and
health plan, as well as other plans, specifying, bidding, and awarding major subcontracts for landfill construction, and landfill
operation, partial construction of the landfill, and the start of remediation of the six former disposal sites. $24,000,000.00,
STANDARD FORM 330 (6/2004) E-
e
...i
<(
r/)
o
0-
o
a:
0-
r/)
r
f-
lL
o
W
<!)
<(
0-
W
..J
f-
;::
w
I
f-
Z
o
Z
o
;::
u
ii'
>-
r/)
w
a:
w
I
f-
o
f-
ei
r/)
'!?
f-
W
W
I
r/)
r/)
r
>-
z
o
o
w
z
;;:
>-
Z
o
U
<(
f-
<(
o
lL
o
W
a:
=>
r/)
g
U
r/)
o
a:
o
w
r/)
=>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Janice Wright McCoy, P.E.
Education
B.s., Ci,"il Engineering, Rensselaer Polytechnic Institute,
19N
Other, Civil! Geotechnical Engineering, Ohio State
U niversit:y
Registrations
Professional Engineer: Civil, AZ, tvL\
Background Summary
tvIs. tvlcCoy, a Lead Geotechnical Engineer in the
Infrastructure Group, has m"er 32 ~"ears of experience in
the field of geotechnical engineering. 1\[s. l\lcCoy's work
includes all aspects of geotechnical engineering including
subsurface investigations, determination of laboratory
testing programs, engineering analyses, and report
preparation. l\[s. l\lcCoy has been im"ol\'ed with the
design of a nuclear pmver plant turbine building
foundation in Taiwan, including the rock exca,"ation
scheme. She has been itwoked \vith the geotechnical
aspects of Independent Spent Fuel Storage Installations
at se,"eralnuclear plants. She was also inwlked in the
detailed geotechnical im"estigation and design criteria
de\"elopment for the North Area of the Central
Artery/Tunnel Project. A summary of her \vork
includes static and dynamic settlement analyses, bearing
capacity analyses, slope stability, liquefaction analyses,
sheetpile and soil anchor design, drilled pier design,
oversight of field activities including borings, earthwork,
piles, and drilled pier installation. She has also prepared
specifications for the geotechnical aspects of many
cons truction projects.
Relevant Experience
04/1978 - Present, Geotechnical
Engineer, Shaw Environmental &
Infrastructure, Inc.
Responsibilities include planning and overseeing
subsurface investigations, including determination of
laboratory testing program and appropriate engineering
analyses. Preparation of construction documents
including geotechnical reports, specifications, and input
to design drawings. Oversight of field activities
including drilling programs, earthwork, and installation
SHAW ENVIRONMENTAL. INC.
06C122006T
of deep foundations including piles, sheet piles, and
drilled piers.
The following is a summary of key projects:
Lead Geotechnical Engineer, Mercury Control
Project, Mercer Generating Station, PSEG Fossil
LLC, Hamilton Township, NJ, 10/2006 - Present.
Design and construction of Mercury Control facilities (2
units) at the Mercer Generating Station in Hamilton
Township, NJ. Borings were completed by TRC and the
laboratory testing was directed by l\[s. l\lcCo)'. Design
of foundations, which \V.ill consist of concrete-filled pipe
piles, \vill be directed by 1\[s. 1\ IcCoy.
Lead Geotechnical Engineer, Chesterfield
Emissions Enhancement, Dominion Energy,
Chester, Virginia, 09/2005 - Present. Took m"er
position as Lead Geotechnical Engineer. Designed l\vo
sheetpiling retaining walls for limestone and gypsum
storage as part of the flue gas desulfurization process.
Performed geotechnical calculations of bearing capacit~.
and settlement for large foundations. Assisted
construction with exca,"ation and backfilling issues.
Directed the preparation of design calculations,
drawings, and specifications for drilled piers to be
installed on a steep hill to support the flue gas ducts.
Geotechnical Engineer, Wilson Hill Wildlife
Management Area Improvements, St. Lawrence -
FDR Power Project, New York Power Authority,
Massena, NY (WHWMA and Nichols Island),
07/2004 - Present. The WH\'\"l\L\ is an existing
complex of earthen dikes which form se'"eral pools
bel\veen the southern shoreline of Lake St. La\vrence,
Wilson Hill, and Bradford Islands. The \'\'HWtvL-\
includes approximately 1,800 acres of wetlands and open
\vater habitats that are managed by the New York State
Department of Environmental Conservation. NYr A is
required to refurbish the dikes and existing water control
structures, and to install one new dike and se,"eral new
water control stnlctures. A subsurface investigation
program was developed by 1\[s. 1\lcCoy in order to
provide the data necessary to e\"aluate the condition of
the existing dikes and foundation conditions for the new
dike. The program consisted of borings, cone
penetrometer testing, field falling head tests, field vane
shear tests, and laboratory testing. Engineering analyses
included slope stability, bearing capacity and settlement
JANICE WRIGHT MCCOY
e
...i
0<
[f)
o
"-
o
Ct:
"-
[f)
I
>-
"-
o
w
'"
0<
"-
~
>-
;:::
W
I
>-
Z
o
Z
o
;:::
u
0:
>-
[f)
W
Ct:
W
I
>-
o
>-
ei
[f)
~
>-
W
W
I
[f)
[f)
I
>-
z
o
o
w
Z
;;'
>-
z
o
U
0<
>-
0<
o
"-
o
w
Ct:
::>
[f)
g
u
[f)
is
Ct:
o
w
[f)
::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
analyses. Construction specifications and drawings were
also prepared for use by the client in construction in
2005-2007.
Accomplishments:
,\ccomplished the field itl\'estigation program \vithin the
allotted time schedule which was mandatcd by the DEC
due to hunting season starting in early Septcmber.
Boring was performed in August 200-1-.
Lead Geotechnical Engineer, Hanscom Air Force
Base, Housing Privatization Project, U.S. Air Force,
Hanscom Field, Middlesex County, MA, 01/2005-
12/2005. This project involves the demolition and
reconstruction of housing at Hanscom Field for military
personnel. Borings wcre pcrformed within thc four
neighborhoods to pro,'ide information for design of
housing, roads, and community-usc structurcs. :\
geotechnical report was preparcd summarizing the
findings and presenting foundation recommendations.
Lead Geotechnical Engineer, Transitway
Maintenance Facility, 02053, Massachusetts Bay
Transportation Authority, Southampton Street,
Boston, Massachusetts, 01/2000 - 10/2003. t-,[s.
t-,IcCoy was responsible for planning and (werseeing the
subsurface im'estigation program. Borings and
laboratory test \"ere performed and Ms. l\IcCoy
produced the geotechnical investigatioll and foulldation
recommendation report. Deep foundations \vere
selected and designed to support the bus garage,
maintenance facility, buswash and fueling buildings. t-,[s.
i\IcCoy produced the contract specifications dealing with
dri,'en piles and O\'ersaw the required pile load tests and
re\'iewed contractor submittals. [\pproximately 700,
l2x53 H-piles \vere installed to a depth of 85 feet \vith a
50 ton design load.
Geotechnical Engineer, Independent Spent Fuel
Installation, Nuclear Management Company,
Duane Arnold Energy Center, Palo, Iowa, 04/2001 -
07/2002. i\ls. i\IcCoy assisted in the subsurface
exploration and construction document preparation for
an independent spent fuel installation at the Duane
[\mold nuclcar powcr plant located in Palo, Iowa.
Specifications for borings, laboratory testing, and
geophysical testing was prepared by her. Ms. tvIcCoy
oversaw the borings drilled for this project and prepared
the final boring logs. tv[s. l\IcCoy prepared bearing
capacity calculations and assisted in the preparation of
the Geotechnical Report. i\[s. i\IcCoy assisted the client
at thc site in thc ovcrsight of excavation and backfill
placement for the [SFSl construction.
Lead Geotechnical Engineer, Ravenswood
Cogeneration Facility, KeySpan Energy, Long
Island City, Queens, NY, 11/2000 - 06/2002. i\[s.
McCoy was assigned as the Lead Geotechnical Engineer
for the proposed 250 tv[\\/ Ravenswood Cogeneration
Facility located at the existing KeySpan Energy
Ravcnswood Facility in Long Island City, NY. r.Is.
~..rcCoy planned and O\Trsaw the subsurface
investigation program and directed the appropriate
laboratory testing (performed by others). She revicwed
and appr()\'ed the subsurface im'estigation report
prcpared by others and used as the basis for foundation
design and construction. l\[S. r.IcCoy directed and
participated in the preparation of calculations, design
critcria and construction specifications for this project.
Approximately 300 drilled piers \vith diameters of 2, -1-
and 5 ft \"ere drilled and socketed into bedrock for
foundation support.
Technical Manager - Section D019E, Central Artery
(1-93)/Tunnel (1-90) Project, Massachusetts
Highway Department, Boston, MA, 02/1992-
12/1996. t\[s. McCoy was rcsponsible for the technical
aspects of the project team's work as Area Geotechnical
Consultant, Area 05 (North Area) of the Central
Artery/Tunnel Projcct in Boston, MA. This project
invoked proposcd tunnel, at-grade, embankment, and
\.iaduct structurcs and utility relocations \vithin an urban
setting and major rail transportation corridor. t\[s.
t\IcCoy's duties included participation and presentation
at project progress and technical meetings, and input to
progress reports, project documents, and technical
reports. She performed or directed the preparation of
project calculations for development of geotechnical
design recommendations and design criteria and was
responsible for the DO 19E Data and Enginccring
Reports. t\[s. tvIcCoy also consulted and assisted with
similar work for the adjacent design sections DO 190 and
DOI9B.
SHAW ENVIRONMENTAL. INC.
2
JANICE WRIGHT MCCOY
ooe 122006T
e
-'
0(
(/)
a
a.
a
'"
a.
<f)
I
f-
u.
a
UJ
'-'
0(
a.
~
f-
;::
UJ
I
f-
Z
a
z
a
;::
u
it'
f-
<f)
UJ
'"
UJ
I
f-
a
f-
ei
<f)
!!!
f-
UJ
UJ
I
<f)
<f)
I
f-
Z
a
o
UJ
z
;(
f-
Z
a
u
0(
f-
0(
o
u.
a
w
'"
::J
<f)
g
u
<f)
o
'"
a
UJ
<f)
::J
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
John Michopoulos, P.E.
Senior Principal Engineer
Education
i\ l.S., Engineering i\Ianagement - Northeastern
University, 1981
B.S., Electrical Engineering - \'('orcester Polytechnic
Institute, 1974
Various Stone & \Vebster Continuing Education
Courses and Management \'('orkshops
Registrations
Professional Engineer: i\L\, NE, TX, and Puerto Rico
Ccrtificate - National Council of Examincrs for
Engineering and Surveying
i\[ember - Colegio de Ingcnieros y Agrimensores de
Puerto Rico (College of Engineers and Surveyors)
Background Summary
i\lr. i\Iichopoulos is a Registered Profcssional Engincer
\vith 33 ycars of expericncc in Project Managemcnt,
Design Coordination and Electrical and Controls
Engineering. He has selTed as a Project /Task i\lanager,
Design Coordinator and an Electrical/Security Engineer
im'oked \vith high and low \'oltage distribution systcms,
security systems, of industrial, commcrcial,
transportation, and utility projects.
i\Ir. i\Iichopoulos is currcntly selTing as a Design
Coordinator for design upgrades of a \'ariety of transit
maintcnance facilities for the l\Iassachusctts Bay
Transportation Authority in the greatcr Boston area.
[\s a Project Coordinator on a major Undcrground
Utility Project, Boston, coordinating and preparing Bid
Documents for the installation of a new 345 kV
underground transmission lines employing pipe-type
cable under approximately 16 miles of roadways through
suburban and densely populated urban areas in the
mctro Boston area.
As Deputy Project Manager on a major transit project
that will provide underground and surface trackless
trollcy service from downtown Boston to the South
Boston Piers area. He directed the team that is
responsible for construction phase services for thc
SHAW ENVIRONMENTAL, INC.
06C122006T
systemwide elements (signals, communications, traction
power, catenary, tunnel lighting, and cmergency tunnel
\'entilation.
,\s Design Interface Coordinator, rcsponsiblc for design
coordination activity between the ,\lignment Section I
contractor and the Systems contractor of thc Trcn
Urbano Public Transit Sys tem in San Juan, Puerto Rico.
As Lead Elcctrical Engineer, responsible for electrical
design of Section I of the Tren Urbano, Public Transit
System.
As Assis tant Project l\Ianager, responsible for
coordinating preparation of design documents
(drawings, specifications, calculations, reports, etc.) for
thc ,\bcrdccn Chcmical Agcnt Disposal Facility, undcr
the Alternati\'c Dcmilitarization Technologics program.
[\s Task !\Ianager, responsible for assessment of facility
infrastructurc sccurity for a Fortune SO
Telccommunication Company.
As a Senior Consultant, responsiblc for an AC powcr
and uninterruptible power supply reliability
bcnchmarking study for two ,\T&T Data Ccntcrs.
,\s Sccurity Revie\vcr, rcsponsible for assessment of
facility infrastructurc sccurity for a Fortune SO
, ,
Telecommunication Company.
As Project l\Ianager/Engineer on the Computer Bascd-
Access Control Program for Logan International [\irport
in Boston and as the Project Engineer on the computer
based access control system for the City of Austin's
Robert !\Iucller l\Iunicipal Airport in Austin.
[\s the Lead Security Enginecr on thc de\'elopment of
the Personal Rapid Transit System for the Regional
Transit [\uthority in Chicago, his duties included review
and development of security systcm recommendations
to be used on the system.
He was assigned as Lead Electrical/Security Engincer on
the security upgrade of a high voltage receiving station in
Los Angeles. His duties include site SlllTCY and review
of thc security systcm and oversecing the design effort
with the intent of making recommendations to provide a
sccurity systcm at a main distribution switchyard for thc
L\ Department of \vater & Power.
JOHN MICHOPOULOS
e
-'
<(
'f)
a
0.
a
a::
0.
'f)
I
>-
u.
a
w
'"
<(
0.
"j
>-
>=
W
I
>-
Z
a
z
a
>=
u
ii'
>-
'f)
w
a::
w
I
f-
a
>-
ei
'f)
~
>-
w
W
I
'f)
'f)
I
>-
z
a
o
w
z
<i'
>-
z
a
u
<(
f-
<(
o
u.
a
w
a::
:::>
'f)
'3
u
'f)
o
a::
a
w
'f)
:::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Mr. Michopoulos has been assigned as a Lead Electrical
Engineer in the chillcd water plant upgradc for the U.S.
Department of State at the Consulate Office Building in
Brazil. He performcd a sitc sllLTey and prepared
specifications and dra\vings to support thc upgrade.
t-.lr. t-.lichopoulos co-de\"eloped infrastructure cluality
review criteria and rcview plans for use to assess AC,
DC, standby power, and security systcms reliability for a
major telecommunications company. He has performed
re\"iews of critical ccntral office network buildings and
has identified areas requiring impro\"ement to enhance
reliability. Also, has performed reliability assessments of
major data processing centcrs.
As Assistant Project t-.lanager, responsible for
coordinating preparation of design documents
(drawings, specifications, reports, ctc) for the Aberdecn
Chemical :\gent Disposal Facility.
He was also assigncd as Lcad Sccurity Engincer on a
security survey \'alidation and upgrade for :\nchoragc
t-.lunicipal Light and Power.
He has preparcd descriptions of task and electrical scopc
estimates for a \"aricty of industrial, commercial, pulp
and papcr, and utility projects.
t-.lr. t-.lichopoulos \vas \vith Chas. T. t-.lain, lne. from
1974 until 1981. He was assigned as a lcad electrical
engineer ill\"oked in all phascs of cngineering through
construction of industrial, pulp and papcr, and
commercial projects including system studies and dcsign,
equipment specification and procurement, capital cost
estimation, and manpowcr projection and selcction.
Relevant Experience
1981 - Present, Shaw Environmental &
Infrastructure, Inc.
/\s Deputy Project t-.lanager on a major transit project
that will provide underground and surface trackless
trolley service from downtown Boston to the South
Boston Piers area, he directed construction phasc
services for the systemwide elements (signals,
communications, traction power, catenary, tunnel
lighting, and emergency tunnel ventilation.
Tren Urbano, Section 1, Interface Design
Coordinator, Public Transit System OAN 1998 to
I SHAW ENVIRONMENTAL, INC.
06C122006T
OCTOBER 2004). As Design lntcrface Coordinator,
rcsponsible for coordinating all design acti\"ity between
the Alignment Section 1 contractor and the Systems
contractor of the Trcn Urbano Public Transit S\'stem in
San .J uan, Puerto Rico.
Tren Urbano, Section 4, 5, 6, Corrosion Control,
Public Transit System (MAY 1998 to OCTOBER
2004). ,\s Support Engineer, responsible for corrosion
control dcsign support acti\"ity for the Alignment
Sections 4,5,6 contractor of the Tren Urbano Public
Transit System in San Juan, Pucrto Rico.
Tren Urbano, Alignment Section 1, Design, Public
Transit System (Nov 1996 to OCTOBER 2004). As
Lcad Electrical Engincer, responsiblc for elcctrical
design drawings, calculations, and specifications for
Alignment Scction I of thc Trcn Urbano Public Transit
Sys tem in San.J uan, Puerto Rico.
U.S. Army Program Manager for Chemical
Demilitarization (Apr 1996 to May 1998). As
Assistant Project Manager, rcsponsible for coordinating
preparation of design documents (drawings,
spccifications, reports, ete.) for the Aberdeen Chemical
,\gcnt Disposal Facilit:y.
Security Study (Nov 1996 to Jan 1997). 1\S Project
t-.lanager, responsiblc for SutTey, intetTie\v, report and
sccurity protcction recommendation guidelincs of the
Nctwork Operation Center for a Fortune SO
Telecommunications Company.
Data Center Reliability Study (Feb 1995 to June
1995). l\S Senior Consultant, responsible for sllLTey and
infrastructure reliability study for t\vo AT&T Data
Centers.
Security Planning (Feb 1994 to June 1995). As
Project t-.lanager, developed a national program of
facility security guidelines for a Fortune SO
Telecommunications Company.
Infrastructure Quality Review Ouly 1992 to Jan
1994). :\s Security Specialist, responsible for facility
security revicws and recommendations for a Fortunc SO
Telecommunications Company.
Security Access Control System Oan 1989 to Dee
1992), Logan International Airport. As Project
JOHN MICHOPOULOS 0
.
-'
<(
(/)
o
a.
o
'"
a.
(/)
I
>-
u.
o
w
'"
<(
a.
~
>-
;::
W
I
>-
Z
o
Z
o
;::
'-'
ii'
>-
(/)
W
'"
W
I
>-
o
>-
.~
(/)
~
>-
W
W
I
(/)
(/)
I
>-
z
o
o
w
Z
:;;:
>-
z
o
'-'
<(
>-
<(
o
u.
o
w
'"
=>
(/)
g
'-'
(/)
is
'"
o
w
(/)
=>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
i\lanager/Engineer, responsible for slllTey, report, and
recommendations to Massport for the design,
implementation, and procurement specifications for a
fedcrally mandated security access control systcm.
Personal Rapid Transit System (Mar 1991 to Oct
1991), Regional Transit Authority. As Lead Security
Engineer, responsible for the security element of the
System Design and Safety, Security, and Failure
i\lanagement Report for the development of a Personal
Rapid Transit System in conjunction with Taxi 2000
Corp. for the Regional Transit ,\uthority in Chicago.
Value Engineering Study (May 1992), Deer Island
Facility Information System (FIS). As a Value
Engineering Team i\Iember, responsible to perform a
Valuc Engineering study and preparc a report of the
Facility Information Systcm for the i\Iass \'(!atcr
Resources Authority's Deer Island Trcatment Plant.
Security Access Control System Oune 1990 to June
1991), Robert Mueller Municipal Airport. As Project
Engineer, responsible for survey, report and
recommendations to the City of ,\ustin for the design,
implemcntation, and procurcment specifications for a
CCTV and access control s\'stem.
Security Survey/Report (Aug 1988 to Dee 1988),
Anchorage Municipal Light & Power. As Lcad
Security Engineer, responsiblc for report of cxisting
conditions and recommcndations for security
imprm'ements at three facilities.
Security Upgrade (Aug 1987 to July 1988), Los
Angeles Department of Water & Power. As Lead
Electrical/Security Engineer, rcsponsiblc for sitc SlllTCY,
report recommendation for equipmcnt specification and
security system design for high voltage receiving Station
B in South Los Angeles.
Chilled Water Plant Upgrade Oan 1988),
Department of State, U.S. Consulate. ,\s Lead
Electrical Engineer, responsible for
specifications/ application of electrical equipment in
support of a chillcd watcr plant upgrade for a U.S.
Consulate in Brazil.
Security Upgrade (May 1988 to July 1988), United
States Information Agency. As Lead
SHAW ENVIRONMENTAL. INC.
06C122006T
Electrical/Security Engineer, responsible for plans of
security eCluipment for a USIS facility in Korea.
Security Upgrade (Apr 1986 to Jan 1987),
Department of State, U.S. Embassy. "\s Lead
Electrical/Security Engineer, responsible for
spccification/ application of security equipment
(microwave, CCTV, passive infrared, ultrasonic motion
detection, ete.) for four U.S. embassies abroad.
Security System (Sept 1986 to Aug 1987), American
Brands, Inc. As Support Engineer, responsible for
technical support to the project (feeder sizing, U.L.
listing requiremcnt study) for security equipment on a
corporate headquarters in Old Greenwich, Connecticut.
,\lso responsible for tracking all time charges and
de\'eloping all scope changes through completion of the
project.
Fossil Plant Life Extension Study (Apr 1986 to Aug
1986) Consolidated Edison Company of New York,
Inc. As Support Engineer, responsible for the re\.ie\v
and preparation of electrical eCluipment inspection
packages for the purpose of plant operating life
extensIon.
Malakoff Electric Generating Station - Units 1 and 2
(Feb 1982 to Apr 1986), Houston Lighting & Power
Company. As Work Package Engineer, responsible for
the preparation of essential sen'ice-emergency diesel
systcm description and spccification of unit substations,
emcrgency diesel generator, cable trays, dry typc
transformers, panelboards, unintermptible power supply
(UPS), communication systcm, and interface with the
furnish and crcct precipitator, flue gas desulfurization
(FC D) scrubbcr, FG D wastc, lignite and limestonc
handling, bottom ash and fly ash contractors for thc
l'.vo-unit, 690 M\,(! lignite-fired plant in Henderson
County, Texas.
Sludge Dewatering Project (Nov 1984 to Jan 1985),
Statler Tissue. As Lead Electrical Engineer,
responsible for specification of cable, motor insert for
dri\'cn equipment, lighting panels and transformers and
general contractor installation specification for addition
of a sludge press for a tissue plant in Augusta, Mainc.
JOHN MICHOPOULOS
3
.
-'
<(
(J)
o
"-
o
0:
"-
(J)
I
>-
u.
o
w
"
<(
"-
':J
>-
>=
W
I
>-
Z
o
Z
o
>=
u
ii'
>-
(J)
W
0:
W
I
>-
o
>-
.!
(J)
'!l
>-
w
w
I
(J)
(J)
I
>-
z
o
o
w
z
4'
>-
z
o
u
<(
>-
<(
o
u.
o
W
0:
::>
(J)
g
u
(J)
is
0:
o
w
(J)
::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Judson T Mitchell, P.G.
Education
Postgraduate Studies, Hydrogeology, \,\'cstern 1'.[ichigan
Uni\'ersity, 1989
Postgraduate Studies, Geology, Virginia Tech, 1973
M.S., Geology, Virginia Tech, 1970
B.A., Geology, Southern Illinois Univcrsity, 1967
Registrations
Professional Geologist: KY, TN
Background Summary
1\lr. i\utchell is the resource manager for the Sha\v E & I
in Grcelwille, South Carolina. He coordinates the work
for 10 professionals including engineers, geologists and
support personnel. The position includcs hiring and
training of personnel. 1'.[r. 1'.litchell also functions as
Project i\Ianager, Task 1\lanager, and Lead
Hydrogeologist for \'arious projccts. Hc is a
Profcssional Geologist with over 25 ycars experience in
geologic and hydrogcologic innstigations that includc
DOD, DOE, Superfund, and RCIL\ sites from
im'estigation to installation and startup, of grounchvater
remedial systems. He has acted as remediation lead on a
multi-plant due diligence site assessment for accjuisition
that included potential environmental liabilities
approaching S2001'.L He has coauthored publications
relating to hydrogeologic tcsting and model
development.
Relevant Experience
OS/2002 - Present, Technical Resource
Manager, Shaw Environmental &
Infrastructure, Inc.
Project Manager, Former Pesticide Mixing Area
RI/FS, 86644700, US Army Corps of Engineers,
Fort Lee, VA, 07/2004. Prepared Work Plan for
Supplemental Risk Assessment and Analytical Results
Report Addendum using analytical data from the former
fire station P A/Sf.
I SHAW ENVIRONMENTAL, INC.
06C122006T
Senior Geologist, Reformatory Landfill Passive Gas
Vent Landfill Installation, US Army Corps of
Engineers, Fort Lee, VA, 04/2004. Provided
e\'aluation of new and cxisting subsurface data to place
6" Passi\'c Gas V cnt wells and horizontal trcnches in a
40 acrc landfill.
Task Manager, Redstone Arsenal, Huntsville, AL,
04/2005. Provided coordination and access to public
and printe land at a sensitive government facility for
approximately 8 miles of seismic suC\'ey activities to
determinc subsurface geology.
Senior Geologist/Hydrogeologist, Triple S Inc. Site
30-3, 100848, Kerr-McGee, Felda, FL, 08/2003 -
Present. Field surny of brine spill arca including slug
tests on 18 wells ranging in depth from 95 to 165 feet.
Recommended time-domain electromagnetic study and
thin-layer analysis to delineate subsurface chloride
contamination. Prepared \vork plan for installation of
ITcO\"Cry \vells and detailed lithologic anal~'sis of soils
using rotosonic methodologics.
Senior Geologist/Hydrogeologist, Northeast
Chemical Site, Reiss Remediation Inc./Koch,
Wilmington, NC, OS/2002 - 2004. Prepared detailed
geologic interpretation of SO acre plant site near the
Cape Fear Rivcr. Principal groundwater contamination
consisted of lead, arsenic, and pH values of Icss than l.
Dcfined historic embayments subsequently filled with
waste clinkcr matcrial and other fill. The information
\vas used to cluantify interim removal actions and future
site remcdiation activities and developed sitc conceptual
model.
Senior Geologist/Hydrogeologist, Charleston
DESC/DFSP, North Charleston, SC, OS/2002-
Present. Provided senior review and technical oversight
to remedial activitics at the DFSP and the Defense Fuel
Supply Pipeline. Directed investigation to define
subsurface contamination and subsequent installation of
7 dual phase extraction wells.
JUDSON T MITCHELL Q
.
-'
<(
(/)
a
a.
a
a:
a.
<!2
I
>-
u.
a
w
<:>
<(
a.
~
>-
0=
w
I
>-
Z
a
z
a
0=
u
c;:
>-
(/)
w
a:
w
I
>-
a
>-
.~
(/)
<!2
>-
w
w
I
(/)
(/)
I
>-
z
a
o
w
z
<i
>-
z
a
u
<(
>-
<(
o
u.
a
w
a:
::>
(/)
'3
u
(/)
o
a:
a
w
(/)
::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Senior Geologist/Hydrogeologist, Elmore, Black &
Veach, Greer, SC, 04/2002 - Present. Performed
project o\'ersight for air-rotary well installation, geologic
interpretation, and rcmcdiation activitics of solvent
contaminated site in fracturcd bedrock O\'erlain by
\veathered bedrock. Interpreted slug tcsts and pump
tests wells at various depths including bedrock.
Senior Geologist/Hydrogeologist, Yorktown Navy
Fuel Depot, LANTDIV DESC, Yorktown, VA,
12/2002 - 06/2003. Developed a site conceptual model
based on boring log, site historical information, and
aquifcr tests. Supported thc dc\'elopmcnt of a 3-
dimensional model to simulate a coupled fluid and heat
transport model based on the PORFLOW software.
]\[odel included effects of tcmperature on viscosity of
NSFO. Developed capture zones and effect of steam
lines and hot water injection in support of the Phase 2
system design.
Project Manager, Former Fire Station Site (FS Site),
US Army Corps of Engineers, Fort Lee, VA, OS/2002
- 06/2003. Field supeLyisor for US,-\CE PA/S!.
Prcpared P A/Sl field sampling plan for a fonner fire
station using rcal-time, onsite laboratory to delincatc
\TOC groundwater contamination using profilcd
geoprobe sampling. Defined lateral and vertical extent
of \TOC contamination. Completed P A/Sl report that
was us cd to obtain agreement with State and Army
representatives to combine both sitcs minimizing
numbcr of functional sitcs at Fort Lce.
11/1998 - OS/2002 Senior
GeologisUHydrogeologist and Technical
Services Manager, Shaw Environmental
& Infrastructure, Inc.
]\[r. Mitchell functioned as Project ]\[anager, Task
Manager, and Lead Hydrogeologist for various projects.
During this time he assumed the responsibility as
Technical Services ]\[anager for Greenville, S.c.,
coordinating the work for a staff of 17 professionals
consisting of engineers, geologists and other support
personnel. The position included hiring and training of
personnel.
Senior Geologist/Hydrogeologist, Charleston
DESC, DESC, North Charleston, SC, 01/2000-
OS/2002 Trained Lead geologist to install monitoring
and dual-phase remediation wclls. Provided tcchnical
oversight and senior rcview to the remedial activitics at
the Defense Fuel Supply Point and the Defense Fuel
Supply Pipeline.
Senior Geologist/Hydrogeologist, Charleston AFB,
Air force Center for Environmental Excellence
(AFCEE), North Charleston, SC, 02/2001 - 06/2001
Provided guidance and field support to install two air
spargc systems in coastal plain scdiments contaminatcd
with volatile organics. Defined geologic setting and
provided insight for remedial system modification.
Installed monitoring wells and air sparge \vells.
Project Manager, Former Pesticide Mixing Area
(PM Site), US Army Corps of Engineers, Fort Lee,
VA, 07/1998 - 07/2000 Conducted field operations for
Phasc II I of RI/ FS iLwestigation of Former Pesticide
]\[ixing [\rea. Prepared RI/FS report for site that
included initiall\VO phases. Demonstratcd that
groundwater \TOC contamination was not a result of
\>]\[ Site acti\'ities rcsulting in future im'estigati\'e acti\'es
upgradient from site.
06/1996 - 11/1998 Senior
GeologisUHydrogeologist, Fluor Daniel
GTI, Greenville, SC
Senior Geologist/Hydrogeologist, Due Diligence -
Confidential Client, Confidential, 5 Sites in North
Carolina and SC, 04/1998 - 08/1998. Technicallcad
for field ilwestigations for Due Diligence assessment for
actluisition of 5 US Plants. Remediation Lead for site
visits and site managcr for field investigations to assess
past and current environmental contlitions at threc
major facilities. Two facilities were listcd CERCL\ sitcs.
Provided tcchnical review of final report ilwolving
multiplc US, European, and ]\[exico sites.
Senior Geologist/Hydrogeologist, Schlumberger-
Pickens, Schlumberger, Pickens, SC, 11/1995 -
02/1998. Prcparcd plan for statistical sampling of
excavation areas for PCB contamination and evaluation
of remaining structures. Sampling plan included
hydrogeologic interpretation of area designated for
groundwater recovery after excavation. Provided
SHAW ENVIRONMENTAL, INC.
JUDSON T MITCHELL 2
06C122006T
e
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
ei
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
technical oversight for site confirmation sampling and
statistical analysis using random/stratified sampling
techniques to demonstrate clean. Prepared multiple site
closure reports and Final Constmction Report.
Senior Hydrogeologist, GE Rome Georgia, GE,
Rome, GA, 01/1997 - 09/1997. Prepared final
Corrective Action Plan and field test report for system
pilot evaluation of dual phase soil gas extraction system
to treat a 3 acre landfill contaminated with PCBs and
other organics. The system included nested pairs of
recovery wells with a steam injection option. The site
was situated in a Karst geologic region.
Senior Geologist/Hydrogeologist, Letterkenny
Army Base, USAEC, ATEPS, Letterkenny Army
Base, PA, 06/1996 - 05/1997. RI Report ~Ianager for
SE OU 5 RI report management, data evaluation,
geologic interpretation, determination of nature and
extent of contamination, QA/ QC of fidd data, and
coordinate preparation of report. Prm'ided senior
technical re\"iew of OU 6 RI report for off-post
Groundwater in an area of partially developed karst
terrain, and OU 7 RI.
Senior Geologist/Hydrogeologist, Sears
(Crestwood) Birmingham, Sears, Birmingham, AL,
07/1996 - 10/1996. Prepared design review and cost
estimates for dual phase extraction system for BTEX
recm'ery from two converging contaminant sites.
Re\'ised design when state removed requirement to treat
both sites. Supported coordination of accelerated
installation and startup. On site for final system
assembly, shakedown, and startup.
07/1991 - 06/1996 Senior
Geologist/Hydrogeologist, Fluor Daniel
Environmental Inc., Greenville, SC
Senior Hydrogeologist, Fort Lee, US Army Corps of
Engineers, Fort Lee, VA, 10/1993 -11/1995. Senior
Hydrogeologist, USACE, Baltimore District, Ft. Lee
Virginia: Provided technical oversight and review for
reports. Prepared three separate site characterization
reports summarizing completed work and
recommending follow-up field investigation activities.
Prepared statistical sampling and analysis plan for
drainage way contaminated with pesticides.
SHAW ENVIRONMENTAL, INC.
OGC122006T
Senior Geologist/Hydrogeologist and Project
Manager, Big D, Olin Chemicals, Kingsville, OH,
07/1991 - 06/1995. Directed multi phase site remedial
investigation of a 7 acre CERCL\ landfill containing
15,000 dmms and 60,000 cubic yards of hazardous
waste. Contamination plume had traveled 2100 feet
covering 60 acres. Prepared all work plans and reports.
Used ~IODFLOW to design and test a groundwater
remediation system of 10 extraction wells, an injection
trench and an interceptor trench. Supervised installation
of total system and, startup of extraction system. Saved
the client over $1 million dollars in installation costs
using a proactive approach.
Senior Geologist/Hydrogeologist, Fernald, DOE
Fernald, Ohio, Ross, OH, 06/1993 - 12/1994.
i\nalyzed and prepared analytical and geologic data for
presentation as an RI report for various mixed waste
units. Soils contamination and groundwater were
separated by glacial till and upper unsaturated zone of a
major aCjuifer. Located contaminant discharge to the
aquifer controlled by buried, tmncated areas of eroded
glacial till. \,\'rote segments of RI report and provided
technical revie\\:. Performed QA/QC m'Crsight for site
il1\"Cstigation to locate a 1m\: le\'el waste cdl. Re\'iscd the
site investigation to finalize disposal cell location and
complete the design.
JUDSON T MITCHEll 3
e
-'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
ei
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Ernest F. Mott-Smith, P.E.
Why Selected as Key Personnel for Contract
. Responsible for environmental engineering studies
and designs and site permitting for numerous
projects Broad experience in dealing with federal
regulatory agencies including EPA and USACE
. Extensive experience with environmental issues and
regulation in Florida
Education
B.S., Environmental Engineering, Uni\'ersity of Florida,
1984
Registrations
Professional Engineer: Ci\.il, FL
Background Summary
t\Ir. t\Iott-Smith has 22 ~'ears of experience in process
design engineering, consulting, and environmental
regulatory interaction. He is an innm'ati\'e technology
specialist in Sha\v's Technology Applications Group
where his principal focus is the process de\'dopment
and technical support for in situ chemical oxidation
CISCO) projects. He also prm'ides project technical
support for a \'ariety of additional technologies such as
steam injection and in situ enhanced bioremediation
(ISEB), primarily for chlorinated ethene sites. In
addition, Mr. Mott-Smith has prm'ided engineering
management and technical direction for Shaw's Tampa
office. Project work responsibilities include proposal
preparation, feasibility studies, conceptual designs, and
technical work plans and specifications for hazardous
\vaste site remediation projects throughout the United
States. Mr. ~Iott-Smith has extensi\'e project and design
experience with the development of innovative remedial
approaches for ISCO including the creation of Shaw's
in-house design program, cost estimating tools,
engineering practices and field technicjues. [-lis earliest
work with ISCO included one of the earliest ozone
sparging projects for pentachlorophenol and both the
permanganate ISCO and steam injection
implementations at the Cape Canaveral Interagency
DNAPL Consortium field technology demonstrations.
SHAW ENVIRONMENTAL, INC.
06C122006T
Mr. Mott-Smith has extensive engineering design and
regulatory experience on nationwide projects for DOD,
DOE, EP1\ (CERCLA and RCIL\), COE, and FDEP
(Florida Dept. of Environmental Protection). ~Ir. ~Iott-
Smith also has been il1\'oh-ed in engineering QC reviews
for more than 250 projects, project management,
engineering supervision/ management, and technical
training. Previously, Mr. ~Iott-Smith has also held
positions within IT/Fluor Daniel GTI/GTI as
engineering manager, regional engineer, client program
manager, and project manager.
t\Ir. t\Iott-Smith pre\'iously spent three years with the
Florida Department of Environmental Protection
(FDEP) Bureau of\Vaste Cleanup as a design review
engineer. [n this role, he re\'iewed more than I SO
project designs for petroleum, hazardous waste, and
DOD sites. Before that, he served as a design re\.iew
engineer for wastewater treatment facilities and as a
resident engineer and construction coordinator for state
and CERCL\ hazardous \vaste assessment and
remediation sites.
Relevant Experience
1990 - Present, Senior Environmental
Engineer/Consultant, Shaw
Environmental & Infrastructure, Inc.,
Tampa, FL.
Senior Technical Manager/Designer, Alaric
Superfund Site, Tampa, FL, (10/02 - Present).
Developed source remediation alternati\'es, remedial
design and cost estimate for 9-acre plume of chlorinated
ethenes emanating from a commercial facility in Tampa.
The project is managed by the U.S. Army Corp of
Engineers Rapid Response Program and J acksol1\'ille
District Office for the EP A. Prepared Remedial Design
and provided engineering constmction oversight of a
S2t\I permanganate ISCO remedy. Design, installation
and startup of project were completed in 10 months
from project inception. Currently provicling oversight of
system operation and optimization. Also functioning as
technical manger for intermediate aquifer feasibility
study preparation.
Senior Technical Manager/Designer,
Hollingsworth Superfund Site, Fort Lauderdale, FL,
(02/04 - Present). Developed source remediation
ERNEST F. MOTT-SMITH, P.E.
e
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
ei
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
o
-'
u
If)
Ci
""
o
UJ
If)
::::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
alternatives, remedial design and cost estimate for plume
of chlorinated ethenes emanating from a former
solderless terminal site that had released TCE into the
Biscayne Aquifer. The project is managed by the U.S.
Army Corp of Engineers Rapid Response Program and
Jacksonville District Office for the EP i\. Prepared
remedial design workplan and construction oversight of
a $O.S~I in situ enhanced bioremediation (with
Dehalococcoides ethenogenes bioaugmentation) remedy.
Design, installation and startup of project were
completed in 5-1/2 months from project funding.
Currently providing O\'ersight of final performance
mOl11tonng.
Remediation Technical Manager, Columbus AFB
Site SS-32, Columbus, MS, (08/06 - Present). Co-
de\'eloped winning proposal strategy for PBC-fixed price
remediation of a 400 acre chlorinated ethene plume for
Columbus AFB. Remedy will use emulsified oil
biobarriers \vith an enhanced groundwater gradient
created via groundwater recO\'Cry wells. Progress to date
includes completion of the site Feasibility Study and
ongoing preparations for a tield scale pilot test and
treatability study.
Remediation Engineer, Multiple Sites, Laughlin
AFB, TX, (10/06 - Present). Co-de\'eloped winning
proposal strategy for a PBC-fixed price remediation of a
chlorinated ethane plume using ISCO \vith persulfate.
Team Member, Exit Strategy Development (ESD)
and Remedial Process Optimization (RPO) Team.
Moody AFB, GA and Hurlburt Field, FL, (07/05 -
09/06). t\Iember of ESD/RPO team charged with
e\'aluating clear and realistic remediation goals and exit
strategies for areas of concern on both bases.
Design Engineer, City Chemical University
Boulevard Site, Orlando, FL, (06/02 -12/06).
Designed an in situ enhanced bioremediation
remediation for TCE source area treatment at a former
dnlm storage yard in Winter Park Florida. Design
consists of a closed loop recirculation cell with lactate
injection. Provided constnlction review and operation
startup oversight in Spring 2005.
Design Engineer, Southern Solvents Superfund Site,
Tampa, FL, (10/03 - Present). Developed design for
$300K ISCO pilot tests for a PCE DNAPL source area.
SHAW ENVIRONMENTAL, INC.
06C 122006T
Remedy to consist of lance permeation with sodium
permanganate. Project is scheduled for implementation
in Spring 2007.
Program Engineering Manager, FDEP Hazardous
Waste Contract (6/02 -12/06). Provided project
design work, technical direction, and remediation
strategies for multiple site remediations invoking
primarily chlorinated ethene-contaminated sites
throughout Florida. Design strategies are principally
ISEB with lactate injection and ISCO with potassium
permanganate.
Senior Project Engineer, In Situ Steam Injection
Demonstration, Cape Canaveral, FL, (5/00 - 06/01).
Project engineer for construction and operation of an
$800,000 in-situ steam stripping system for TCE
DNAPL remediation at the Launch Complex 34 site.
\Vork was sponsored by the Interagency DNAPL
Consortium (DOE. EP A, N"\SA, llSAF, and DOD)
and \vill be de\'eloped into an [~PA site demonstration.
Prepared design construction drawings for remedial
system layout and construction, The project was
successful at rem(wing 90'Y" of the contamination
(12,000 lbs) within 6 months.
Senior Project Engineer, Launch Complex 34, Cape
Canaveral ISCO Demonstration, FL, (2001). Design
engineer for S I M in situ chemical oxidation (ISCO)
using potassium permanganate for TCE DNAPL
remediation at the Launch Complex 34 site at Cape
Canaveral, Florida. This work \vas sponsored by the
Interagency DNf\PL Consortium (DOE, EPA, N,\SA,
USAF, and DOD) and has been de\'eloped into an EPi\
SITE demonstration. The project successfully removed
approximately 8,000 pounds of TCE in 4 months field
time.
Senior Project Engineer, Feasibility Study, Scovill
Superfund Site, Dickson, TN, (04/02 - 09/03).
Prepared focused feasibility study, cost estimating, and
remedial alternative analysis for an industrial facili~'
impacted with chlorinated ethenes. Site lithology
consists of clay o\'erburden and nibble zone overlying
karst limestone. Evaluated several combinations of
technologies including ISEB, ISCO, electro-resistive
heating, zero-valent iron, and deep soil mixing.
ERNEST F. MOTT-SMITH, P.E.
2
e
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
Cl
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
ei
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
'"
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Project Manager, Senior Project Engineer, CSX
Transportation, Jacksonville, FL, (9/01- 03/03).
Project Engineer for implementation of slurry wall
construction for waste oil pits. Principal role included
providing regulatory support, design O\'ersight, and
project support for slurry wall application.
Project Consultant (1999 - Present). PrO\'ided
regulatory support and design consulting for se\'eral
EPA, DOD, and DOE facilities:
. Redstone Arsenal, AL - Conceptual design and cost
estimating for in situ steam injection treatability study
. Myrtle Beach Air Force Base, SC - Fire training
area solvent remecliation with ISCO
. Moody Air Force Base, GA - ISCO conceptual
remedial design
. Shaw AFB, SC - ISCO conceptual remedial design
. Ott Cordova Superfund Site, Muskegon, MI -
Conceptual design and remedial costing for SSi\[ in
.. . .
Situ air sparglllg curtalll
. Milan Army Ammunition Plant, Milan, TN -
ISCO remedial design feasibility study support and
cost estimating for a S22M RDX contamination
remedy for ~I~I cubic yards of contaminated soil in
OUI (Area i\Q.
. DOE Pantex Facility, Amarillo, TX Interim
Corrective i\Ieasure Design for nitro toluenes, RDX,
ISCO and enhanced bioremediation
Project Manager/Design Engineer, NEDC Dry
Cleaners (non Program Site), Sarasota, FL, (7/00-
Present). Developed design and budgetary cost
estimate for S l.OM site restoration using ISCO with air
sparging. PrO\'ided o\'Crsight of project Phase I
execution and evaluation of data collected. Currently
developing remedial strategy for enhanced in situ
bioremediation for a new release at the site.
Senior Project Engineer, Southside Station Plant,
JEA, Jacksonville, FL, (1999 - 2004). Assisted with
development of site closure plan, environmental plans,
scheduling, cost estimating, and conceptual design
engineering for site property divestiture of active
municipal power plant. Site is a designated FDEP
Brownfield. Site covers 29 acres impacted with PAHs,
metals, and PCBs.
Project Engineer, DOE PORTS Site, Pi keville, OH,
(2000). Co-developed engineering approach and
SHAW ENVIRONMENTAL, INC.
OGC122006T
remedial costs for in situ oxidation demonstration
project for DOE Portsmouth Plant. [nnO\'ative
approach il1\'olved the fracturing of a clay matrix and the
injection of sodium permanganate as an oxidant into the
clay matrix.
Program Manager, FDEP Hazardous Waste
Contract, FL, (2/96 -10/98). Responsible for
managing FDEP Hazardous \Vaste Contract No.
H\'('350 for turn-key environmental consulting services
for uncontrolled hazardous waste sites and drycleaning
facilities in Florida. Primary responsibility for
de\'clopment of Statement of Qualifications and winning
bid strategy. Provided startup oversight of program, site
assessments and remedial design alternative analyses for
initial sites awarded O\'er a two-year period.
Project Manager, Omni-Vest Landfill, FL, (4/96-
9/99). Responsible for budgeting, scheduling, client
relations, and feasibility study preparation for a non-
permitted industrial landfill impacted by 100,000 gallons
of terpene as nonaqueous-phase liquid (NAPL).
Design Engineer, Area FT-17, Cape Canaveral,
USAF Fire Training Area, FL, (1996). Designed air
sparge curtain for treating vinyl chloride and DCE. The
system consists of six, 200-foot long trenched horizontal
\vells to a depth of 35 feet. Design included modeling an
in situ countercurrent plate air stripper model to predict
system efficiency.
Design Engineer of Record, Industrial landfill, GA,
(1995 - 1996). Sen'ed as engineer of record for an
industrial landfill impacted with PCBs, chlorobenzenes,
and chlorinated solvents such as PCE and TCE. Co-
de\'e1oped feasibility stud~', work scope, and pilot test for
dual-phase vacuum extraction and steam injection
system. Developed model for predicting dual phase
flow regime in extraction piping. Pilot test successfully
demonstrated the technology approach to the State
regulatory agency and USEP A resulting in a potential
sa\'ings of several million dollars over excavation of the
Landfill material.
Project Design Engineer, Wood Surface Treatment
Facility, Jacksonville, FL, (1990 - 2001). Co-
developed remedial design alternatives and cost
estimates for pentachlorophenol site remediation.
i\ssisted in designing treatability studies and in situ
ERNEST F. MOTT-SMITH, P.E.
3
e
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
'"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
ei
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
o
""
o
UJ
If)
::::>
e
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
ozonation pilot test. Produced preliminary design for
bioremediation and ozonation system. \'\!rote
specifications and work plan for interim and final site
remedial action for site dewatering and soil exca\'ation.
Site closure obtained following exca\'ation and natural
. ..
attenuation monltonng.
Design Engineer, Potable Water Treatment System
Design, St. Croix, USVI (1994). Designed, specified,
and bid 260-gpm groundwater treatment system for a
potable well field impacted \V1.th aromatic hydrocarbons.
The system used a cooling tower as a roughing stripper
to reduce loading to a tray stripping unit and to oxidize
and settle out high-inorganic loading.
Design Engineer, Pharmaceutical facility, Miami,
FL, (1992-1994). Design engineer for a facility impacted
\vith PCE and TCE in soil and groundwater. f\ five-well
groundwater recO\'ery and treatment system with SVE
has reduced PCE and TCE concentrations from as high
as 380,000 ppb to less than 1 ppb in all monitoring wells.
Fluor Daniel GTI recei\'ed an incentive award for
maintaining the project ahead of schedule.
Remedial Design Engineer, Manufacturing facility,
Miami, FL, (1993-1994). Served as remedial design
engineer for a manufacturing facility impacted by
chlorinated solvents within the Biscayne .-\cluifer. The
recovery and treatment operation reduced PCE and
TCE concentrations by more than 95 percent.
Design Engineer, Industrial facility, Orlando, FL,
(1992 -1997). Designed remedial system for diesel
contamination beneath a process operation floor for an
airline support equipment manufacturing facility. The
design included separate-phase product recovery,
ground-water recovery and treatment, SVE, air sparging,
and land farming.
SHAW ENVIRONMENTAL, INC.
ERNEST F. MOTT-SMITH, P.E.
4
OGe 122006T
.
--'
<{
If)
o
"'-
o
0::
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
.~
~
CD
::::>
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
William J. Palmieri
Education
B.S., Ci\'il Engineering, Northeastern University, 1965
Registrations
Professional Engineer: (Structural), MA
Background Summary
l\Ir. Palmieri is a civil engineer registered as a
professional structural engineer, with more than 40 years
of ci\'il/ structural and multi-disciplined experience. His
experience includes preparation of proposals and
presentations, contract negotiations, project
management and administration, including scope
development, schedule and budget control, quality
assurance and technical reviews, planning, feasibility
studies, site selection studies, report preparation,
building evaluation, engineering, design supen'ision,
specification preparation, cost estimating, scheduling,
bid analysis, and construction administration. Projects
include site selection; site development; new and existing
roadway improvement programs; engineering/ design of
new and assessment/ rehabilitation of existing bridges
for local and interstate roadways/higll\vays and railroads;
storm\vater drainage and flood control; municipal and
industrial water supply, storage, and distribution
facilities; sanitary sewerage/wastewater collection and
treatment facilities; vehicle maintenance facilities;
railway, public transit and inter-modal transportation
facilities; new and rehabilitated structured and surface
parking facilities; commercial and educational facilities;
central boiler plants and utility distribution systems. I-Ie
has performed structural damage assessments and served
as an expert witness in construction arbitration
proceedings. He also sen'ed as a member of a Board of
Public Works responsible for planning and
implementation of capital improvements, overseeing
budgets, operation and maintenance of water and sewer
systems, wastewater treatment system, sanitary landfill,
municipal roadways, storm drainage systems, vehicle
maintenance, cemetery and public lands, including
oceanfront facilities.
SHAW ENVIRONMENTAL, INC.
OGC122006T
Relevant Experience
1996 - Present, Senior Project Manager,
Shaw Environmental & Infrastructure, Inc.
Preparation of proposals, including teaming agreements,
project understanding, scope of work, managing
technical approach, le\'el of effort, cost proposals, and
contract negotiations.
American-Eagle Communities, LLC (for
USAFCEE) - Privatization of Military Housing,
Hanscom Air Force Base, Lincoln, MA. Design and
construction of site and utility infrastructure
imprO\'ements for existing military housing on an
approximately 181-acre site, to support phased
construction of 850 existing housing units by 784 new
units, with a minimum of 607 units anilable at all times
during construction. [\ new communi~' center, 3
neighborhood centers and a maintenance facili~' are also
included. Public access and utility sen'ices including
domestic and fire protection water, sanitary sewerage,
natural gas seLyice, electric power, communications and
cable sen'ices must be maintained at all times during the
phased construction. The project includes ne\v roads,
imprm'ements to existing roads, crossing wetlands,
regrading the site, and storm drainage impro\'ements
using Bt\IP's to reduce peak flows to below pre-
construction le\'Cls.
USDOT /FTA - PMO for Dallas Area Rapid Transit
LRT System Expansion, Dallas, TX. DART
program for expansion of the light rail transit system
involves extension of current LRT facilities and sen'ices
to the Northeast and the Southwest. Assisted in risk
assessment/mitigation and technical review of station
design, plans, specifications and estimates for sixteen at-
grade and aerial light rail stations included within six
section contracts for the project.
USDOT /FTA - PMO for Port Authority Allegheny
County (PAAC) Project, Pittsburgh, PA. North
Shore LRT Connector project invokes extension of
current LRT facilities to connect between the Golden
Triangle and the North Shore of Pittsburgh. Assisted in
risk assessment/ mitigation and technical review of
station design, plans, specifications and estimates for
nine contracts related to station shell and finishes for the
North Shore Connector portion of the project.
WILLIAM J. PALMIERI
.
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
.~
!!l
'"
::::>
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
o
-'
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
MBT A - Beverly Station Parking Improvements,
Beverly, MA. Project ~Ianager for a team of engineers,
architects, parking specialists and environmental
scientists in the study, planning, engineering, and
preparation of conceptual designs for impro\'ements to
an existing commuter rail station, including traffic,
parking and station accessibility improvements,
expanded provisions for regional bus service, schematic
design of three different options for a new multi-level
parking stmcture containing 400 to 700 parking spaces
with pedestrian bridge connecting to the existing train
station. An em'ironmental site assessment was
performed for the proposed parking structure site which
was formerly used as an automobile wrecking facility.
Land survey was performed to facilitate design and be
used for land acquisition purposes. Schematic Design
Report summarized study results and recommended a
preferred option.
MBTA - Park Street/Haymarket Stations, Light
Rail Accessibility Program, Boston, MA. Project
t\hnager for a Joint - V en ture team to renO\'a te and
improve key stations at historic Park Street and
Haymarket Green Line Stations to comply with the
:\mericans with Disabilities "\ct. Park Street,
constructed in 1897, is located under Boston Common
(on the National Register of Historic Places), and the
Station is designated as an historic landmark. The
project invoh'ed platform modifications including
relocation of existing columns to prO\'ide accessible
paths of travel, raising of the platforms to accommodate
new low-floor light-rail \'ehicles, adjusting all station
finishes, fixtures and appurtenances affected by the
platform raising, and improving audioh'isual signage
and communications to comply with ADA
requirements. As the busiest station in the ~fBTA
system, staging of constmction to minimize impact on
revenue service while keeping the stations opens to
public use during constmction was critical for the
design.
Massport, MBT A, MassHighway - Anderson
Regional Transportation Center, Woburn MA.
Project ~Ianager for a multi-discipline team of engineers,
architects, and parking operation specialists in the
planning, engineering, design and constmction
administration of a new intermodal transportation center
serving three stakeholder agencies (~[assport, ~lBTA
and ~IHD). Located on a former Superfund site in
\Voburn, it was the first public facility in t\-Iassachusetts
to be constmcted on a Brownfield (contaminated site
that had been remediated). The project included
relocation of mainline tracks, construction of t\vo ne\v
raiV signal interlocking; a new bypass track and freight
spur; new commuter rail station with high-level center
island platform, two pedestrian bridges over the tracks
to parking areas; a new t\vo-story 9,000 sCluare foot (sf)
intermodal station building; Logan Express, regional and
local bus loading platforms; \'anpooV carpool and park-
and-ride loading platforms; surface parking for 2,500
cars separated by daily, short- and long-term
requirements, and ach'anced parking and revenue control
systems to accommodate different parking fee policies
of the three agencies. Design focused on prm'iding a
user-friendly facility, projecting a positive and inviting
image at the former Superfund site, and developing
construction staging to minimize impact on existing rail
sef\'ice during constmction. Existing commuter rail and
bus stations were decommissioned as part of the project.
Total construction cost including railroad impro\'ements
\vas S I 5.6 million.
Texas Utilities Electric Company, Dallas, TX - Rail
Spur to Big Brown Station. Project prm'ided a new
rail spur from Big Brown SES to an interconnection
with the Burlington Northern and Southern Pacific
Railroads to allO\v deliven" of western states coal to the
power station. Tracks ran 26 miles across rolling terrain,
crossing surface water courses, wetlands, undisturbed
uplands, and reclaimed strip mining lands, with
numerous roachvay crossings of various classifications.
~[ajor stmctures included trestles, bridges and
underpasses where grade separation was required for
safety, operations, or environmental purposes. Studies
were performed for on-site or remote-site coal unloading
and handling. ~Iultiple constmction contracts were
phased over a three-year period.
SHAW ENVIRONMENTAL, INC.
2
WILLIAM J. PALMIERI
06C 122006T
.
-'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
.~
~
'"
::::>
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
0::
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
MBT A - Park Street/Boylston Street Stations,
Tremont Street Tunnel, Boston, MA,
Waterproofing, Structural Repairs, and Historic
Restoration. Project ~Ianager for waterproofing,
structural repairs, and historic restoration of the Park
Street and Boylston Street Green Line stations, and the
Tremont Street subway tunnel running under Tremont
Street and Boston Common between the two stations.
Constmcted in 1895, the tunnel and stations were the
first part of the first subway system ever constructed in
the United States (fifth oldest subway system in the
world). Designated as historic landmarks, they are
located under Boston Common which is listed on the
National Register of Historic Places. Waterproofing of
the tunnel roof utilized open cut for access, rec]uiring
phased work areas for traffic control, and
removal/ replacement of selected trees on Boston
Common. Close coordination was required with the
City of Boston Department of Public \'('orks, \V'ith
surface restoration of Boston Common and
reconstruction of Tremont Street being performed by
the City.
MassHighway - Bridge B-25-11, Main Street Over
Salisbury Brook, Brockton, MA. Project 0.[anager for
replacement of an existing four-lane urban roachvay
bridge over an existing waterway through a congested
neighborhood. Project included a subsurface
investigation program, preparation of plans,
specifications and construction cost estimates for traffic
management, temporary pedestrian bridge, demolition of
existing superstructure, new pile supported abutments,
new pre-cast concrete superstructure, protection and
replacement of existing utilities, roadway approach work
including roadway, sidewalk, drainage and utility
lmprO\'ements.
MBTA - Repairs/Improvements, Existing Braintree
Station Parking Garage, Braintree MA. Project
~lanager for repairs and improvements to the existing
1, 100-car parking garage complex serving the in termodal
transportation facility at the Red Line Braintree Station.
The existing parking complex consists of two
precast/prestressed concrete structures arranged in a
staggered-deck system connected by two circular pattern
vertical access ramps. Pedestrian access from the garage
to the transit station utilizes walkways at grade and a
SHAW ENVIRONMENTAL, INC.
OGC122006T
covered pedestrian bridge over the bus way. Minimizing
impact on revenue service while keeping existing
facilities open to the public during construction was
critical.
MBT A - Repairs/Improvements, Existing Quincy
Adams Station Parking Garage, Quincy Project
~Ianager for repairs and improvements to the existing
2, 100-car parking garage complex serving the intermodal
transportation facility at the Red Line Quincy Adams
Station. The existing parking complex includes two
independent, six level, and precast/prestressed concrete
parking structures separated by a covered
busway / atrium, and connected by crossover bridges at
selected levels. Each structure has its own drum ramp
structure for \'ertical access from a common toll plaza
that ties directly to ramps connecting \V.ith the regional
highway system. The two garages are servcd by a
common elevator/lobby core connected to the rapid
transit station. t\[inimizing impact on re\'Cnue selTice
while keeping existing facilities open to the public during
construction \vas critical.
MBT A - Quincy Adams Station Parking Garage
Addition, Quincy MA. .\s Project t\Ianager, led a team
of specialists to increase parking capacity at the existing
intermodal transportation facility at the Red Line Ouinc\'
.\dams Station. The addition w~s designed as a ne:' six~
le\'el, precast/prestressed concrete structure tied to the
existing ramp and parking complex, increasing parking
capacity at the station by 1,400 spaces to a total of 3,500.
The multi-disciplined project was taken through
schematic, design development and final design.
Minimizing impact on revenue sef\'ice while keeping
existing facilities open to the public during construction
was critical.
MBT A - Braintree Station Parking Garage Addition,
Braintree, MA. I\S Project ~Ianager, led a team of
specialists to increase parking capacity at the existing
intermodal transportation facility at the Red Line
Braintree Station. The addition was designed as a
vertical expansion of the existing two level, precast -
prestressed concrete staggered deck structure, utilizing
the existing ramp and access systems, increasing parking
capacity at the station by approximately 700 spaces to a
total of 1,800. The multi-disciplined project was placed
on hold by the MBT A. Design focused on minimizing
WILLIAM J. PALMIERI
3
.
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
.~
~
'"
::::>
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
impact on revenue service while keeping existing
facilities open to the public during constmction.
MassTurnpike Authority - Maintenance Facility
Improvements, Various Locations, MA. As Project
t\lanager, led a multi-disciplined team for improvements
and expansion of existing maintenance facilities and
improvements at existing police barrack fueling stations
located along the Turnpike at South borough, Auburn,
Charlton, Chicopee, Blandford and Lee. The project
included improvement and expansion of personnel
facilities, light and hea\)' truck maintenance facilities,
addition of sand-salt storage buildings, and canopies at
police barrack fueling stations.
SHAW ENVIRONMENTAL, INC.
WILLIAM J. PALMIERI
4
OGC122006T
.
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
.~
~
<Il
::::>
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
D
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Richard A. Pariseau, P.E.
Education
~LS., Environmental Sciences, Rutgers University, 1973
B.S., Chemistry, Stonehill College, 1968
Registrations
Professional Engineer: ~L\, TX, IL
Background Summary
t\lr. Pariseau is a Project Engineer in the E & I
Engineering Design Center. He is an Engineer with
over 30 years of experience on utility, cogeneration and
industrial projects. He directs the activities of water and
wastewater treatment professionals in the design,
procurement, operational re\'iew, and permitting
associated with gas and coal fired utility water and
wastewater treatment systems.
He has prepared conceptual and detailed designs for
water and wastewater treatment systems at nuclear and
fossil fueled power stations, cogeneration and combined
cycle stations and industrial facilities including makeup
and condensate demineralizers, clarifiers, filters, steam
cycle sampling, sanitary \vaste treatment, stormwater
management systems and chemical feed systems. His
responsibilities ha\'e included the preparation of
technical and economic e\'aluations of alternative
systems, flow diagrams, cost estimates, equipment
layouts, and specifications for eCluipment procurement,
review of manufacturer's drawings and inspection of
equipment.
Among his current assignments are the design and
engineering of wastewater treatment systems for flue gas
desulphurization systems at China Light and Power
Castle Peak Station, Reliant Keystone Station,
Constellation Energy Brandon Shores Station and
Mirant Dickerson, Chalk Point and Morgantown
Stations. Previous FGD wastewater assignments
included the support of the f\merican Electric Power
~lountaineer and Cardinal sites FGD System retrofits in
the area of wastewater collection, treatment and
discharge. He is also assigned to the Dominion Energy
Chesterfield project FGD System to support project
makeup water and wastewater issues.
He completed the support of the startup and
commissioning of the zero discharge wastewater
treatment s\,stem at the I-Iarquahala Generating Station
in Tonopah, Arizona. He also supported the startup and
commissioning of the steam/water chemistry systems at
Harcluahala and at the Covert Generating facility in
CO\'ert, t\ Iichigan.
f\lso, he completed makeup water treatment system
reviews of commissioned systems at the Sugar Creek,
Indiana and Bogue, Jamaica combined cycle plants of
~Iirant. For Distrigas of Everett, he provided
recommendations to reduce fouling of SCR catalyst,
which was being caused by the erosion of flue gas duct
insulation and b\' NOx injection water dissolved solids.
For O\'er five years, his major assignment was the
preparation of EPC proposals for water, wastewater and
chemical systems for national and international power
generating facilities. The systems for which conceptual
design \vas de\,doped and cost estimates prepared
include desalination, electrochlorination, zero discharge
\vastewater treatment, demineralization, steam/water
analysis, water chemistry laboratory, and chemical
injection. Plant water use was e\'aluated for each facility
and a water balance was prepared.
He was responsible for the ell\'ironmental engineering
and design of the Shaw Combined Cycle Reference
Plant. Corporate position papers were completed on
HRSC; Chemical Feed, Steam/Water ,\nalysis and
Chemical and Oil Tank Containment. Arrangement
drawings were produced for plant water systems and
system descriptions and PlD's were prepared. Position
papers on modularization of major combined cycle plant
water and waste\vater components \vere prepared.
He completed the permitting support and elwironmental
engineering and design of the 750 M\,\l combined cycle
AES Granite Ridge Project in Londonderry, NH. l\S
Owner's engineer for AES Corp, he attended hearings
and prepared support documentation to regulatory
authorities for the plant water and wastewater systems.
He assisted in the preparation of the NDES permit for
the plant, which uses secondary sewage effluent as
cooling tower makeup, discharging to a town sewer w'ith
existing hydrogen sulfide based corrosion problems. He
was responsible for the design of the water treatment
SHAW ENVIRONMENTAL, INC.
RICHARD A. PARISEAU
OGC 122006T
.
-'
<{
If)
o
"'-
o
a:
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
.~
!'l
CD
::::>
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
building that included the cooling tower clarifier/ filter,
demineralizer, chemical feed, and wastewater and sump
pump systems. He also prO\'ided the operator training
for these systems. The cooling to\ver makeup system is
a 3000-gpm system comprised of an integral ballasted
t10w type clarifier and multimedia filter.
He served as Owner's environmental engineer in
support of the conceptual design, licensing and
permitting of the water systems for three cycle Exelon
pO\ver projects in the greater Boston area - ~Iystic, Fore
R.i\'er and ~Iedway.
He completed design of the t\[asinloc Project in the
Philippines, two - 300MW coal fired plants which began
operation on schedule in 1998. He \vas responsible for
design, procurement and field Sllpport of the
clectrochlorination system, demineralized water
treatment system, wastewater treatment system, tra\'eling
water screen, steam/water analysis system, raw water
system, potable water system and selyice water system.
He has conducted due diligence reviews of water and
wastewater treatment systems at cogeneration facilities,
including a zero-discharge solar energy facility, a zero-
discharge coal-fired cogeneration plant, and a zero-
discharge coal waste fired plant.
He has designed modifications to the stormwater
collection system at the Petersburg Generating Station
of Indianapolis Power and Light. The project required
the segregation of process wastewater and potentiall~'
contaminated stormwater mnoff from noncontaminated
runoff and included the design of lined channels,
underground piping, lift stations and oil/water
separators. He also prepared the Erosion Control Plan
for the construction of wet limestone Flue Gas
Desulfurization systems for Petersburg Units I and 2.
Relevant Experience
1973 - Present, Shaw Environmental &
Infrastructure, Inc.
Mirant Dickerson, Chalk Point and Morgantown
FGD Wastewater Systems. Developed the conceptual
design of wastewater treatment system to sllpport the
retrofit of a wet limestone scrubber to the coal fired
power plants. ~[odified plant water balance to
incorporate water use and wastewater discharges from
SHAW ENVIRONMENTAL, INC.
06C122006T
FGD system. Prepared detailed study and cost estimate
for the FGD wastewater system.
Prepared bid specification, conducted bid evaluation and
prepared purchase recommendation for FGD
wastewater system supplier.
Constellation Energy Brandon Shores FGD
Wastewater Treatment System. Developed the
conceptual and detailed design of wastewater and
makeup water treatment system to support the retrofit
of a wet limestone scmbber to the coal ftred power
plant. Modified plant \vater balance to incorporate water
use and waste\vater discharges from FGD system.
Prepared detailed study and cost estimate for the FGD
wastewater system. Supported the evaluation of the
impact of rGD wastewater discharge on the Patapsco
River in accordance with ~Iaryland \vater quality
standards.
Prepared bid specification, conducted bid evaluation and
prepared purchase recommendation for makeup water
and rGD wastewater system suppliers.
Reliant Keystone FGD Wastewater Treatment
System. De\'eloped the conceptual and detailed design
of wastewater and makeup water treatment system to
support the retrofit of a wet limestone scrubber to the
coal fired power plant. t\Ioclified plant water balance to
incorporate water use and waste\vater clischarges from
FGD system. Prepared detailed study and cost estimate
for the FGD wastewater system, including an evaluation
of a zero wastewater discharge system using e\'aporative
based technology. Supported the evaluation of the
impact of FGD wastewater discharge on Crooked Creek
and the Allegheny River in accordance with
Pennsylvania water quality standards.
Prepared bid specification, conducted bid evaluation and
prepared purchase recommendation for FGD
wastewater system supplier.
PPL Montour and Bruner Island FGD Wastewater
Treatment Systems. Developed the conceptual and
detailed design of a wastewater treatment system to
support the retrofit of a wet limestone scrubber to the
coal fired power plants. Modified plant water balance to
incorporate water use and wastewater discharges from
FGD system. Prepared detailed study and cost estimate
RICHARD A. PARISEAU
2
.
-'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
.~
~
'"
::::>
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
for the FGD wastewater system. Supported the
e\'aluation of the impact of FGD wastewater discharge
on the Susquehanna River in accordance with
Pennsykania \vater quality standards.
Prepared bid specification, conducted bid evaluation and
prepared purchase recommendation for FG D
wastewater system supplier.
Mountaineer FGD System. Developed the conceptual
design of water and wastewater systems to support the
retrofit of a wet limestone scrubber to the coal fired
power plant. Calculated stormwater runoff from FDG
system storage piles. r.lodified plant water balance to
incorporate water use and wastewater discharges from
FGO system. Prepared detailed study and cost estimate
of alternati\'e systems to provide water treatment to
produce makeup water of quality suitable to support
multiple FGD system \vater requirements. Developed
conceptual design and cost estimate for FGD
waste\vater treatment system. E\'aluated impact of FG D
waste\vater discharge on the Ohio River in accordance
with \,\'est Virginia water cluality standards.
Chesterfield FGD System. Denloping the conceptual
design of \vater and \vaste\vater systems to support the
retrofit of a wet limestone scrubber to the coal fired
power plant. E\'aluating water treatment systems to
produce makeup water of quality suitable to support
multiple FGO system water requirements. De\'eloping a
conceptual design and cost estimate for FG D
wastewater treatment system, consisting of two- stage
(hydroxide and sulfide) precipitation of heavy mctals and
biochemical oxygen demand (BOD) removal.
Harquahala Generating Station. Participated in the
startup of a zero liquid discharge system for this
combined cycle gas fired plant in Tonopah, Arizona.
The system includes clarificr/ softener, multimedia filter,
reverse osmOSIS, vapor recompress or evaporator,
crystallizer and centrifuge. Responsibilities included
review of operating chemistry information and
recommendation of operations practices for the unit
processes in the system.
Participated in thc startup of the steam systems by
evaluation of steam cycle chemistry data. Reviewed data
to determine reasons for steam chemistry contaminants
being above applicable limits and recommended
I SHAW ENVIRONMENTAL, INC.
OGC122006T
additional data collection. Assisted in the identification
of a defective deaerating condenser as the cause of high
s team conductivity.
AES Granite Ridge Combined Cycle Power Project.
Preparcd PID's, spccifications, bid evaluations, reviewed
manufacturers drawings and supported the design of the
cooling tower makeup treatment, demineralizer,
chemical feed, steam water analysis, wastewater and
sump pump and tank heater systems. The cooling tower
makeup system is a 3000 gpm system comprised of a
biological filter, clarifier and multimedia filter.
Assisted in the permitting and licensing of the project by
preparing answers to agency questions on water and
wastewater. Prepared draft \,\'astewater Permit for
discharge to local POT\V, including calculation of
concentrations of chemical releases. Developed
chemistry monitoring program for analysis of makeup
water and potable water. Evaluated alternati\'e
technologies for treatment of sewage effluent as makeup
to the plant circulating \vater system and for treatment
of municipal water as makeup to the plant demineralized
water treatment s\'stem
Petersburg Station, Indianapolis Power & Light
Company. As Lead Environmental Engineer,
supported the submittal of a plant NPOES permit by
compiling a cluantitative site water balance for the
existing four unit coal-fired power plant, each with wet
limestone scrubber. The \vater balance included ri\'Cr
water, storm\vater and \vastewater collection and
trea tmen t.
Prepared an erosion control plan for construction of the
rGD systems in accordancc with Indiana Department of
Environmental Management Guidelines.
Prepared engineering and design modifications to the
site storm drain system to improve coal pile runoff
collection and segregation process wastewater from
stormwater. Project included the design of lift stations,
redesign and installation of new catch basins and
drainage piping, and a survey of plant drawings to
identify dry weather drainage flow.
Sithe Energy - Mystic, Fore River and Medway
Projects. Assisted in the permitting and licensing of the
project by developing the conceptual design of the water
RICHARD A. PARISEAU I~
.
-'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
Cl
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
.~
~
OJ
::::>
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
Q:
::::>
If)
g
u
If)
is
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
and wastewater treatment systems. Supervised the
development of the conceptual and detailed design of
the stormwater drainage systems for the projects in
accordance with the guidelines of the ~Iassachusetts
Stormwater Policy.
Mirant Sugar Creek and Bogue Combined Cycle
Projects. Completed design review of makeup water
treatment systems at two ~lirant project startups.
The Bogue system consisted of fixed film biological
reactor, dissolved air flotation, multimedia filtration,
reverse osmosis and clectrodeionization. t\lakeup water
to the facility is from the ~lontego Bay municipal
wastewater treatment plant.
The Sugar Creek system consisted or iron precipitation,
filtration, re\'erse osmosis and electrodeionization. Loss
of ferric chloride feed pumps had caused contamination
of the entire system \vith ferric hydroxide, requiring
substantial cleaning of \'essels and filters and reverse
osmosis membrane cleaning. Confirmed the adecluacy
of the system to switch makeup water source from river
water to ground \vater.
Vermont Yankee. Prepared studies e\'aluating the
impact of a 750,[\,\' uprate of the Vermont Yankee
Nuclear Power Plant on silt deposition in the cooling
tower and on the concentration factor for Total
Dissoked Solids in the plant circulating water system.
PPN Combined Cycle Project (India). Prepared a
specification for re\'erse osmosis desalination of
seawater to provide potable and makeup water for
combined cycle power project. Developed a monitoring
program to analyze seawater to support desalination
system design. ,\ssisted in the evaluation of proposals
and the selection of the system supplier for the system
and detailed design de\'elopment of the system.
Reviewed specifications for chemical feed, sanitary waste
treatment and gaseous chlorination systems for the
project
Fossil Project Development. Prepared specifications,
e\'aluated bids, prepared conceptual design, and cluantity
development for piping, valves, and instruments for
water treatment, e1ectrochlorination, condensate
polisher, waste treatment, chemical feed, and
SHAW ENVIRONMENTAL, INC.
OGC 122006T
steam/water analysis systems to support lump sum
turnkey projects for national and international projects.
Fresh Kin Landfin Leachate Treatment, New York
Department of Sanitation. As Lead El1\'ironmental
Engineer, prO\'ides re\'iew of process chemistry data and
recommendations for operational changes for a
sequencing batch reactor (SBR) operated to nitrify and
precipitate metals from landfill leachate from a
municipal solid waste landfill.
E.W. Stout Generating Station. As Lead
Environmental Engineer, supef\'ised the design of the
storm drainage systems for the addition of two
combustion turbine units to the station. Prepared the
drainage design submittal to the City of Indianapolis to
construct the system and the Erosion Control plan to
the Indiana Department of El1\,ironmental ~Ianagement.
Aliveri Power Project, Public Power Corporation of
Greece. As Consulting Engineer, prepared
specifications and design dra\vings for a tender
document for two 600-~[\'\' coal-fired plants. Systems
included reverse osmosis desalination for boiler and flue
gas desulfurization system makeup, waste\vater
collection and treatment, steam/water analysis, and
chemical injection. Plot plans and layouts were
developed for water and wastewater treatment systems.
Finch Pruyin Paper Co., Glens Falls, NY. .As Project
Engineer, responsible for engineering and design of
projects to retrofit bulk chemical storage facilities and
additional demineralized water production facilities at
the paper mill. Also responsible for cost and scheduling
activities. Designed chemistry laboratory facilities for
steam plant.
Walling Ford Municipal Wastewater Treatment
Plant, Wallingford, CT. As Lead El1\'ironmental
Engineer, prepared Operating and t\Iaintenance Manuals
for ~Icchanical Ec}uipment installed in the 8 t\IGD
municipal waste\V'ater treatment plant which employs
Rotating Biological Contactors for secondary and tertiary
treatment.
RICHARD A. PARISEAU
4
.
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
.~
~
Cll
::::>
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
o
-'
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Michael Powers
Education
B.E., Civil Engineering, \Ventworth Institute of
Tcchnology, 1991
Registrations
\Vastewater Treatment Plant Operator: United States,
Background Summary
t\[r. Powers has O\'er fifteen years of ci\'il and
cl1\'ironmental engineering consulting experience,
prO\'iding design, technical oversight, coordination, and
project management. t\Ir. Powers has been involved in
projccts associated with water and \vaste\vater systems at
power-plants and waste\V'ater treatment plants \vithin the
United States with responsibilities including the
preparation of proposals, engineering design documents,
P&IDs, cost estimates, eCluipment layouts, specifications
for equipment procurement, re\'iew of manufacturcr's
drawings and inspection of eCluipment, construction
supef\'ision inspection of installed eCluipment.
i\Ir. Powers has also completed projects at numerous
hazardous \vaste site remediation and remedial actions
sites including multiple industrial and Superfund sites.
Throughout Mr. Powers's career, his resourcefulness,
new approaches, and ideas have enabled him to soh-e the
challenges he has faced with his projects, closing them
on time and on budget.
Relevant Experience
OS/2005 - Present, Project Engineer,
Shaw Environmental & Infrastructure, Inc.
Project Engineer for the redesign of the headworks at
the existing wastewater treatment plant for the t\[arine
~Iountain \\'arfare Training Center in Central Cf\.
Assumed lead engineer responsibilities for sanitary issues
and provided design oversight of mechanical, electrical,
civil and I&C engineers for the project. Provided
coordinated of the project for the California Project
Manger and the client including providing required
design submittals and arranging design meetings with the
client. The plant required upgrades to the headworks to
include a flow meter, bar screen, and grit removal system
to bring the facility into compliance with its permit
requirements. The project also recluired additional
modernization to the plant infrastructure to prO\'ide
existing equipment protection from local sever weather
issues that included building roofs to keep snow out of
open tanks and the demolition and construction of a
new lab and control building for the treatment plant.
Additional upgrades at the facility include paving and
grading of the work areas, PLC controls upgrades,
influent and effluent sampler installations, retaining
walls, demolition, electrical and HVAC upgrades.
03/2004 - Present, Task Engineer, Shaw
Environmental & Infrastructure, Inc.
. Prepared the water and wastewater bids for Shaw's SO
year utility privatization proposals for multiple military
bases within the United States. Conducted life cycle
analysis of existing infrastructure and prepared 50 year
replacement schedules for water and wastewater utility
equipment to upgrade the cluality and supply of
sef\'ices for the bases. Bid items included \'ah-es,
water distribution mains, sewer collection lines, waste
pump stations, water supply wells, water towers, water
meter systems, line cleaning and repairs, manhole
replacements and associated manpO\ver requirements
for \vater and \vastewater treatment plant and
collections operations. Also prepared the projected
repair and replacement schedules for each bases
\vaster and waste\vater treatment facilities and piping
systems based on the projected life cycle of the
project to maintain and upgrade the existing
infrastructure facilities. Prepared O&~I staffing and
costs as well as the transition requirements including
costs and staffing.
. Provided re\'iew of an industrial clients site to assess
the situation with a problematic packaged wastewater
treatment system installed to treat sanitary wastes
from the facility. During the assessment it was noted
that the system was not operating properly as the
treatment system was accepting larger volumes of
waste than permitted and un-permitted wastes were
also being sent to the facility. The entire facilities
operations were then rcviewed and a plan to bring the
facility back into compliance was prepared along with
the proper notifications to the state permitting board
were made. The facility was required to stop wet
floor scrubbing operations, and forced to reduce
potable water use by updating fixtures and eliminating
non permitted flows. A water balance was prepared
utilizing historical information to locate the high water
use locations for planning water savings and for
SHAW ENVIRONMENTAL, INC.
MICHAEL POWERS
OGC122006T
.
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
.~
~
en
::::>
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
submission to the state agencies during possible
permit modifications.
01/2005 - 06/2006, Lead Engineer, Shaw
Environmental & Infrastructure, Inc.
\,\'orked as the lead water distribution and wastewater
collection engineer for the redesign of the existing 78-1-
unit military family housing area. The private developer
who leases the property for the next 50 years is replacing
all the housing units currently at the site over the next 5
years. The reconfigurations recluired new infrastructure
to be designed for bid solicitations and environmental
permitting. \Vork included the re-routing of water
distribution piping through the ne\v layout of homes,
proper zoning of the \vater s)'Stem, fIre supply and sizing
of individual services for single through multiplex units
and the supply of the required dra\vings and
specifications for the construction of the water and
wastewater portions of the project. Design included
interaction with existing base engineering and fire
department to satisfy concerns and recjuirements unique
to military infrastructure systems. The sanitary sewer
collection piping was also rearranged to accommodate
the re\vorked housing arrangement including the
addition of a number of new streets and dead ends that
were added. \,\'ork included the addition and
replacement design of collection mains to transmit
sewerage to the existing base collection system for
disposal, sizing and layout of sanitary mains and sen'ices
to each neighborhood and building location.
11/1991 - 06/2004, Task Engineer, Shaw
Environmental & Infrastructure, Inc.
Designed and re\'ised P&IDs for power plant HRSG
and cooling tower chemical feed systems for
purchase, reviewed and approved manufacturers
dra\V-ings of chemical feed system equipment and
water sampling systems. Supported lead engineer by
completing reviews of required system information,
Owner/Vendor changes, and routing design and
drawings for inter-discipline re\'iew. Supported lead
engineer with review of design documents for vendor
supplied and installed zero liguid discharge water
treatment system at site. Constmcted a multi faceted
water balance and process flow diagram to
incorporate all aspects of system operation including
the zero liquid discharge system to assist plant Owner
with the daily nomination of the plants raw water
requirement for multiple operational conditions.
Provided review of bids from chemical feed system
SHAW ENVIRONMENTAL, INC.
OGC 122006T
bidders and the Owner supplied demineralization bids
for conformance with the specifications. \Vorked on-
site with project management personnel utilizing the
CEMs system information to report emissions
violations. Constructed backup documentation to
support each \'io!ation, \'erify its authenticity, and
prepare the proper reports to the permitting board
detailing the reason and the steps taken to prevent
future violations. Interfaced with CEMs vendor to
have changes made to system to correctly display and
collect recluired information and ensure the proper
reporting of the information for regulatory purposes.
· Constmcted, modified, and reviewed detailed mass
balance calculations for a chemical weapons
demilitarization facility including all process licluids
associated with the neutralization process to detail
quantities for offsite disposal and eCluipment sizing.
t\Iaintained and updated block-flow diagrams to
correlate to revised P&IDs and system design
changes. Constructed detailed area descriptions of
multiple operational areas within the containment
building for use b~' process system operators to
determine operation of treatment area and for review
of hazards contained within the area. Revie\ved
system descriptions drafted by other disciplines within
the project to maintain reporting continuity within
reports as \vell as technical content.
Brought in to conduct walk-downs of the
demineralized \vater s)'Stem supplied and installed by a
previous contractor that was not yet operational.
Reviewed P&IDs, installed equipment, and changes
made to the system by the client and pre\'ious
engineering contractor. SupetTised craft personnd to
complete the installation of the remaining system
eCluipment and constructed / maintained punch-list
during work at site. Verified design by previous
vendor of demineralization system to accommodate
the current and future raw water supplies. Designed
and oversaw changes to upgrade the chemical feed
systems, instrumentation system and PLC controls to
maintain proper system operation and decrease the
manual monitoring requirement for plant operators.
Reviewed all demineralization vendor P&IDs and
marked up drawings as changes were made for final
editing as record copies. Oversaw startup of the
demineralized water system to verify design criteria
were met and system operated to client specifications.
Troubleshot the as-built regeneration chemical feed
systems and modifIed the design to accommodate
specific site issues and storage locations of bulk
chemicals to allow proper regeneration of the mixed
bed de-ionization systems. Provided educational
MICHAEL POWERS
2
.
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
'"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
.~
~
'"
::::>
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
classes to the site plant operators in the operation and
maintenance of the new treatment system prior to
takeO\'er from the construction contractor.
. Designed and re\'ised P&IDs for power plant I-IRSG
chemical feed system, demineralized water, sampling
system and \vastewater disposal system in preparation
for construction. Re\'iewed regulations regarding
storage and use of chemicals on Long Island for use
by project to comply with County regulations.
Supported other disciplines \V'ithin the job to facilitate
changes to system designs to maintain environmental
compliance. Constructed a water balance to
incorporate all aspects of system operation to support
the plant Owner with the estimation of raw \vater
requirements and equipment sizing. ~Iaintained
environmental budget to maintain cost and schedule
for environmental portion of project. Preformed
calculations for design and specification of I-IRSG
chemical feed pumps, waste\vater, and demineralized
water pumps and head-loss calculations for piping in
each system.
. Designed and installed numerous Soil Vapor
Extraction r\ir Sparging systems as well as
biosparging systems for the removal of contaminates
at numerous industrial and manufacturing facilities.
Design engineer, pilot testing, and construction
supervisor for the installation and startup of
numerous dual phase biorcmediation cells and
groundwater remediation systems to remO\'e gasoline,
chlorinated compounds, in-situ jet fuel and other
contaminates to promote biodegradation. Activities
included coordination and contracting of construction
\'enclors including electrical, mechanical, building, and
excantion vendors to build the designed system to
the project schedule and budget. Installations include
remediation equipment within the treatment building
including blowers, system controls. The system
installations included o\'er 2.5 miles of process pipe,
70 extraction wells and all electrical and mechanical
systems. Constructed multiple SVE/ AS treatment
trailers including all piping and mechanical work as
well as electrical and control design for operation of
trailer.
I SHAW ENVIRONMENTAL, INC.
OGC122006T
MICHAEL POWERS [2:]
.
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
.~
~
III
::::>
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
0::
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Bruce R. Raine, P.E.
Mechanical Engineer
Education
B.S., i\Iechanical Engineering, Drexel University, 1986
Registrations
Professional Engineer, MA, ~IE, NY, 0 I-I, P A, andRI
Background Summary
Mr. Raine is a Lead Engineer at Shaw/Stone & \,\Tebster
and is a registered Professional ~[echanical Engineer in
six states. I-Ie has over 20 years of experience in the
natural gas industry with extensi\'C involvement in the
design of natural gas transmission, pressure regulation,
gas distribution, and gas compression facilities. He also
has a working knowledge in permitting, engineering and
construction of Licluefied Natural Gas (LNG) facilities.
I-Ie has prm'ided technical support and project
management sen'ices during the execution of natural gas
infrastructure projects including gas distribution systems,
gas metering and pressure regulation facilities and gas
compression facilities.
As Project t\Ianager and Project Engineer, t\Ir. Raine has
organized and executed projects and tasks up to $20
million in value. I-lis expertise is in process design,
pipeline hydraulic flow analysis and equipment
specification writing for natural gas transmission,
distribution and LNG facilities. His duties include
providing technical support and system design for
natural gas pipeline projects including LNG liquefaction
and \'aporization facilities and gas custody transfer meter
stations. During the past ten years, Mr. Raine has
successfully executed several reciprocating gas
compression projects in excess of 10,000 horsepower for
gas transmission companies located in the northeastern
United States. He has also permitted and engineered at
least five natural gas flow measurement and/ or pressure
regulation facilities.
~Ir. Raine has expert knowledge of the New England gas
industry and has been a consultant to many of the
regions natural gas transmission companies performing
engineering studies, Federal and State permitting
activities, preliminary and detailed facility design, capital
I SHAW ENVIRONMENTAL, INC.
OGC122006T
cost estimates and construction management selTices.
I-Ie has consulted to Shaw's Homeland Security division
as a natural gas industry expert in the State of New
York. He provided technical input in the preparation of
se\'eral vulnerability assessments of N ew York State
energy facilities in the natural gas, LNG and liquid
petroleum indus tries.
~Ir. Raine has a working knowledge of alternative fuel
systems for transportation vehicles such as compressed
natural gas (CNG) and LNG fuels used in passenger
buses and commercial vehicles. He has engineered and
constructed se\'eral bus fueling stations utilizing CNG
and LNG as alternative fuels to traditional diesel.
t\[r. Raine's field experience includes being the Resident
Engineer during the construction of a LNG vaporization
facility in Fisher, Illinois and during the construction of a
large metering and pressure regulation facility in Bronx,
New York. During field assignments, he has inspected
construction identifying technical and permitting
deficiencies and on the behalf of the Owner, monitored
the construction contractor.
Relevant Experience
1989 - Present, Shaw Environmental &
Infrastructure, Inc.
Dominion Energy - Brayton Point POTW Makeup
Water System (2005 to 2006). Dominion Energy will
install air emission control systems on units 1,2 and 3 at
their Brayton Point Station in Somerset, t\Iassachusetts
as part of a new air emission control program.
Dominion proposes to supply 1.28 ~IGD of this
makeup demand \vith treated effluent from the Somerset
POT\,' and the remaining 0.43 ~IGD with Somerset city
water. A 10 inch pipeline will be installed from the new
lift station at the Somerset POT\V to the Brayton Point
Station storage tank. The pipeline will be buried within
an existing water and sewer line easement granted to the
Town of Somerset, in an existing crossing under
Interstate 195, partially in town streets and within
property owned by National Grid and along Brayton
Point Road to a new makeup water storage tank adjacent
to the air emission control systems. ~Ir. Raine will
engineer the POT\V pipeline and prepare the pipeline
alignment sheets for permitting and construction. The
pipeline will be piggable and includes all necessary
BRUCE R. RAINE Q
.
0::
"'-
If)
I
f-
"'-
o
UJ
Cl
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
.~
~
'"
::::>
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
launchers, recei\'ers, \'alves & fittings to clean the
pipeline. The Unit 1 and 2 systems are scheduled for
operation in fall 2007 and the Unit 3 FGD system is
scheduled for 20 lO.
Pennsylvania Power & Light - Brunner Island-
Utility Relocation Project (2005). ~Ir. Raine was Lead
Engineer and investigated the location of existing plant
utilities at Brunner Island Generation plant in the area
designated for the installation of Flue Gas
Desulphurization (FGD) facilities. He initiated a
drawing reyiew and prepared an electronic map
depicting the location and depth of cO\'er for all existing
utilities in the subject area. The information will be
utilized by the FGD design engineers during site
de\'Clopmen t.
Dominion - Chesterfield Emission Enhancement
Projects - Piping Relocation Project (2003 to 2004).
Shaw is the selected contractor to Engineer, Procure and
Construct (EPC) se\'eral emission enhancement projects
related to the Chesterfield Generating Station,
Chesterfield, VA. As part of this project, t\Ir. Raine was
Lead E-:ngineer during the preparation of specifications
and drawings necessary to contract the supply,
fabrication, installation and testing of fuel oil, waste
water and fire protection piping relocations, including all
required steel pipe supports and their foundations at the
Chesterfield Station. The piping relocations were
necessary to complcte a secondary containment dike to
surround the existing Unit No.8 Fuel Oil Tank. The
piping relocations have been completed.
Tennessee Gas Transmission - Pipeline Appraisal-
Schoharie County, NY (2003 to 2005). Mr. Raine
prepared a detailed capital cost appraisal for one 8500
hp, natural gas compressor station and approximately 55
miles of natural gas transmission pipelines in Schoharie
Coun ty, New York. The appraisals arc part of
continuing litigation between Schoharie County and
Tennessee Gas Transmission over property taxation
\'aluations. ~lr. Raine will provide expert testimony
during future court appearances representing Tennessee
Gas Transmission.
I SHAW ENVIRONMENTAL, INC.
OGC 122006T
Iroquois Natural Gas Transmission System (1999 to
2004). t\Ir. Raine was Project Engineer for Iroquois Gas
Transmission S\'stem's (IGTS) Eastchester Extension
Project. During the permitting phase, he assisted in the
preparation of the FERC Enyironmental permit.
During detailed design, he \vas the Project Engineer and
Professional Engineer responsible for the mechanical
design of five gas compression facilities totaling over
40,000 horsepower, approximately 1-1/2 miles of 24"
transmission pipeline and a 360 mmscfd natural gas
metering and pressure regulation (M&R) facility. During
construction, he was the Resident Engineer responsible
for the technical installation and operation of the t\I&R
facility.
Hunts Point t\letering & Pressure Regulation Facility -
At the terminus of the Eastchester Extension marine
pipeline, S&W designed a natural gas metering &
pressure regulation facility located at the existing
Consolidated Edison of NY's Hunts Point Compressor
Station. The facilit\, was designed to meter, preheat and
control the tlow of IGTS gas sales into Con Ed's
\,\'estchester latcral. Gas sales arc measured through a
24" ultrasonic tlow meter. Gas preheating is
accomplished \'ia two (lOOo!" redundant) 20
mmBTU /hr, Johnston hot \vater heaters. [-!cat is
exchanged \vith the process gas through t\vo (1000/0
redundant) shell and tube heat exchangers. Flow control
and pressure regulation is performed through three (SO'Yt,
redundant) runs of Fisher control vakes.
Eastern Shore Natural Gas (2000 to 2001). As
Project Engineer, Mr. Raine was responsible for the
preliminary and detailed design of a 3,300 horsepmver
mainline natural gas compressor station in Daleville,
Pennsvlvania. The gas compressor station consisted of
two, Caterpillar G3606-LE-TI\-130 natural gas engines
rated to 1,665 bhp @ 1,000 rpm driving t\vo, Ariel
JGC/.f, t\vo throw, single stage, reciprocating natural gas
compressors. The duration of the project was
approximately one year and had a budget of $8 million.
North Carolina Natural Gas (1998 to 1999). [\s
Project Engineer, t\Ir. Raine was responsible for the
design and construction of a 3,300 horsepower mainline
natural gas compressor station in Clayton, North
Carolina. The gas compressor station consisted of t\vo,
Caterpillar G3606-LE-TA-130 natural gas engines rated
BRUCE R. RAINE D
.
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
to
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
to 1,665 bhp @ 1,000 rpm driving two, ArielJGC/2,
two throw, single stage, reciprocating natural gas
compressors. The duration of the project was
approximately one year and had a budget of $6 million.
The project was successful and allows NCNG to feed
existing customers including several pmver generation
facilities.
BG Transco UK (Aug 1997 to Present). As Lead
~[echanical Engineer, Mr. Raine performed compressor
station hydraulic design calculations for a three unit, gas
engine driven, reciprocating gas compressor station
totaling 18,750 hp for BG Storage at the I-[ornsea Salt
Ca\'ity Storage Facility. [-Ie performed conceptual
studies and made recommendations for suitable
eCluipment selection, plant layout, operating economics
and a capital cost estimate.
Eastern Shore Natural Gas Company (Dec. 1995 to
Apr 1997). t\Ir. Raine was Project Engineer for the
design of a nominal 3,300 horsepmver gas engine dri\'Cn,
natural gas compressor station for the Eastern Shore
Natural Gas Company. The Delaware City compressor
station consists of three, Caterpillar G 35 16-LE-Ti\- 130
natural gas engines rated to 1085 bhp @ 120D rpm and
three Ariel J G D-2 f\VO throw, single stage, reciprocating
gas compressors. . The Delaware City Compressor
Station is an unmanned facility and is controlled from
the companies headquarters located in Dm'er, Dela\vare
Massachusetts Municipal Wholesale Electric
Company Guly 1996 to Dec 1996). ~Ir. Raine was
Project Engineer for the engineering and design of a 15
mile, 5,000 sdh high pressure gas transmission pipeline,
custody transfer, gas metering and pressure regulation
facility required for the fuel cot1\'ersion from oil to gas
of five, electric pO\ver generation gas turbine engines.
The scope of work to site the pipeline included
el1\'ironmental, State and local regulatory permitting.
The facilities are planned for operation in 1999.
Commonwealth Electric Company (Sept 1995 to
Mar 1996). As Mechanical Engineer, Mr. Raine
designed and prepared Piping and instrument Diagrams
and physical installation drawings to construct a 3,750
mscfh natural gas pressure regulation facility. The
regulation setting is used to supply natural gas into the
Canal Unit 2 electrical generation facility.
I SHAW ENVIRONMENTAL. INC.
OGC122006T
Commonwealth Electric converted the Canal Unit 2
facility from oil to natural gas. The drawings and
specifications were used during the cOI1\'ersion.
General Electric Company (Aug 1995 to Dec 1995).
t\[r. Raine was the on site representati\'e during the
design and installation of approximately 3000 feet of 12"
to 48" diameters of Insituform cured-in-place linings.
General Electric installed the linings into their existing
storm drainage systems using trench less technologies to
prevent soil contaminates from infiltrating into the
piping and being discharged into the Saugus Ri\'er. I-Ie
was present during construction re\'ie\ving the
installation techniclues and specifications.
NKK Corporation Gune 1995 to Sept 1995). t\[r.
Raine performed a transient hydraulic anal~'sis of a
natural gas compression facility and feed gas pipeline for
a gas turbine driven, electrical power generation facility
located in Tokyo, Japan. He hydraulically analyzed a
variable speed, electric motor dri\'en, centrifugal feed gas
compressor station and transportation pipeline using
Stoner Associates G,\SUS transient analysis program.
I-Ie also completed an economic analysis of the proposed
compression machinery to determine the most cost
effecti\'e driver/ compressor selection
Granite State Gas Transmission, Inc. G une 1994 to
Aug 1994). ,\s Lead ~[echanical Engineer, Mr. Raine
engineered, \vrote purchase and construction
specifications, managed contract bids and \vas tield
inspector during the blowdown, repair and purge of nine
miles of 18" gas pipeline in Windham, ~Iaine. He was
construction manager for the project and represented
GSGT during construction. The pipeline remediation
project was successfully completed so that GSGT could
destructi\'ely test five, 18" wrinkle bends to determine
these physical properties.
Western Farmers Electric Corporation Gan 1994 to
Feb 1994). As Lead Mechanical Engineer, t\Ir. Raine
studied and made operational recommendations to
WFEC to eliminate liquid hydrocarbon condensation
from wet natural gas presently produced from this
Trailfield gathering system in western Oklahoma. He
utilized a process simulation program (SnvISCI pro II) to
model the gathering system and performed an economic
analysis of several remedial options.
BRUCE R. RAINE 0
.
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
-'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
Peoples Gas Light & Coke Company (Dec 1992 to
Oct 1993). As Lead ~Iechanical Engineer, was
responsible for the design calculations, specifications
writing, system modeling, carbon and stainless steel
piping design, heating and ventilation design, and onsite
construction field engineering for a $6.5 million liquefied
natural gas plant vaporization system. During the
design, he prepared process and instrumentation
diagrams and detailed mechanical installation piping
drawings for hot water/ ethylene glycol, liquefied natural
gas, instrument air, heating and ventilation, and natural
gas fuel piping systems. He also prepared contract
specifications and prepared all mechanical nkes and
equipment purchasing specifications. During
construction, he received all equipment, made field
moditlcations, and inspected the work of the ~[echanical
Contractor. This plant has been in operation since
October 1993.
Granite State Gas Transmission, Incorporated (Mar
1992 to Dec 1992). As Lead t\[echanical Engineer, he
designed 1-1/2 miles of 12"-.312" wall thickness, high
tensile strength natural gas pipeline in Newington, New
Hampshire. I-Ie prepared the construction installation
specification, specified line pipe, \'akes, coatings, and
construction procedures. He prepared and re\'ie\ved
drawing details and pipeline alignment sheets. During
the construction phase, he was onsite as Pipeline
Ins pector \vorking wi th the ins talla tion con tractor
inspecting all work for conformance with the
specification. As a part of this project, he inspected the
installation of 3,000 feet of 12" carbon steel and 8"
polyethylene pipe installed from a transmission pipeline
to a local electrical pO\ver producer. He also assisted in
the inspection of a natural gas pressure reduction and
metering facility at the same power station.
North Country Pipeline Corporation (Nov 1991 to
Dec 1991). As ~Iechanical Engineer, ~[r. Raine assisted
in a field pipeline alignment sur\'CY for a future 12" high
pressure, natural gas pipeline associated with a co-
generation facility to be built in Platts burgh, N ew York.
l\Ir. Raine walked most of the pipeline right-of-way and
marked the proposed alignment, met with the local
landowners and prepared all road crossing detail
drawings. Used tax and highway maps to determine
property boundaries.
I SHAW ENVIRONMENTAL, INC.
06C 122006T
Scott Paper Corporation Oune 1991 to Nov 1991). As
Lead ~Iechanical Engineer, ~Ir. Raine produced the
piping design, hydraulic analysis and specification writing
for a three mile, gravity feed, 32" polyethylene water
effluent pipeline for a tissue cO\1\'erting facility in
Owensboro, Kentucky. t\[r. Raine supervised the
generation of computerized pipeline alignment drawings
and details. Designed one cased road and railway
crossing plan and se\'eral hydraulic structures allO\ving
water to flow into the Ohio River. He represented
Stone & Webster at the pre-bid meeting as the design
engineer answering questions from potential contractors.
BRUCE R. RAINE Q
.
--'
<{
If)
o
"'-
o
a::
"'-
If)
I
f-
"'-
o
UJ
Cl
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
a::
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Jong-chiang Shiau
Education
Ph.D., Civil Engineering, State University of New York
at Buffalo, 1972
~LE., Civil Engineering, State University of New York at
Buffalo, 1968
B.S., Civil Engineering, National Cheng Kung
U ni\'Crsity, 1963
Registrations
Professional Engineer: Ci\'il, GA l\L\, Rl
Background Summary
Dr. Shiau has more than 35 years of experience in ci\'il,
hydraulic, geotechnical, infrastructure, and
environmental engineering, and in project controls. I-lis
experience lies in a wide range of project types, including
transportation, watcr rcsources, pmver and industrial
de\'elopment. Dr. Shiau's expertise includes multi-
soft\vare capability, computer modeling, and numerical
techniclues to perform both engineering and project
control function.
His expertise on rivcr hydraulics includes tlood tlmv
prediction and scdiment erosion analysis. I-Ie directed
numerous highway-crossing projects to il1\'estigate
hydraulic factors that affect stream stability due to
tloodplain encroachment, bridge openings and highway
alignment, stream embankment design, and scouring of
abutment, foundations, and piers. As part of his
substantial experience, Dr. Shiau was a member of a
four-man team that \'isited China to re\'iew and evaluate
sedimentation problems of the Three Gorges Project.
He also directed and reviewed waterfront projects on
stability of breakwater and revetment structures, and
scour protection of intake structures, pipeline, and dikes.
Dr. Shiau has extensi\'e experience in surface water
hydrology including stormwater management for a
nriety of industrial and urban development projects.
He directed the probable maximum tlood analysis,
resen'oir routing for numerous nuclear power plants.
His experience also includes stormwater detention pond
design, erosion and sediment control, and river and
reservoir routings. He directed tlood hazard
assessments for a series of dam breaks in ri\'ers, design
of sheet pile foundation and retaining wall, fish
migration structures and elwironmental impact
e\'aluation for pipeline crossings
His expcrience also includes engineering support of
project licensing and permitting under federal, state, and
local regulations dealing with stormwater management.
I-lis experience includes post-development water quality
and cluantity control of a detention pond or a recharge
basin, and erosion and sediment control.
His expertise in groundwater hydrology includes
groundwater tlo\v and transport modeling, aquifer
characterization, and the groundwater ele\'ation
predictions. He has extensi\'e experience in
hydrological, hydraulic, civil, and geotechnical support of
hazardous waste management projects including site and
groundwater assessments, remediation design, landfill
design/ closure, lcachate collection/ runoff system
design, settlement/sediment detention pond design, and
other waste remm'al systems.
As a Project Control Engineer on the Boston Central
l\rtery Third I-Iarbor Tunnel Project, his duties and
responsibilities included identification of tasks, project
milestones, and control points. He de\'eloped and
maintained detailed contract schedules, contract budgets,
planning documents, monthly progress reports, and fee
schedules for the team and its subconsultants. He also
prm'ided technical training and specialized expertise to
team members in the use of and Borlog computer
programs. He standardized the Borlog program to
prO\'ide a unified reporting mechanism to ease team
members' understanding and comprehension of multiple
records.
Relevant Experience
09/1985 - Present, Lead Hydraulic
Engineer, Shaw Environmental &
Infrastructure, Inc.
Responsibilities include providing support to client
projects including wetland management, roadway
improvement, railroad, transportation, water resources,
power and industrial and urban development and office
staff as a lead hydraulic engineer. I\lso responsible for
business development, preparing technical portions of
SHAW ENVIRONMENTAL, INC.
JONG-CHIANG SHIAU
06C 122006T
.
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
major construction and design engineering proposals.
Recent assignments have included:
The following is a summary of key projects:
Lead Hydraulic Engineer, Dickerson, Midrant Mid-
Atlantic, Montgomery County, MD 09/2006-
Present. This project is to redevelop Dickerson
Generating Station, a steam-electric power plant.
Develop the onsite offsite stormwater drainage system
to meet the stormwater discharge requirements.
-'
<{
If)
o
"'-
o
0::
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
UJ
-'
f-
>=
UJ
I
f-
Z
o
z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
Accomplishments:
The preliminary conceptual design and estimation are
completed.
Lead Hydraulic Engineer, Morgantown, Mirant
Mid-Atlantic, Charles County, MD, 09/2006-
Present. This project is to redevelop l\forgantown
Cenerating Station, a steam-electric power plant.
De\'elop the onsite offsite stornl\vater drainage system
to meet the storm\vater discharge requirements.
.-\ccomplishments:
The preliminary conceptual design and estimation are
completed.
Lead Hydraulic Engineer, Chalk Point, Midrant
Mid-Atlantic, Prince George's County, MD, 09/2006
- Present. This project is to redevelop Chalk Point
Generating Station, a steam-electric pO\ver plant.
Develop the onsite offsite stormwater drainage system
to meet the stormwater discharge retluirements.
Accomplishments:
The preliminary conceptual design and estimation are
completed.
Lead Hydraulic Engineer, National Enrichment
Facility, Louisiana Energy Services, Albuquerque,
NM, 12/2005 - Present. The project is to design and
develop LES Nuclear Enrichment facility located in Lea
County., New t\Iexico.
Determine the maximum ponding depth in adjacent to
buildings for the Probable maximum precipitation
(PMP) storm event. Develop the onsite stormwater
control system to drain runoff offsite.
:\ccomplishments:
The development of the site drainage system in
obtaining the site construction permit.
Lead Hydraulic Engineer, Emission Control
Projects, Dominion, Brayton Point, MA, 12/2004 -
Present. This project is to redevelop Brayton Point
Generating Station, a steam-electric power plant.
Establish the coastal flood A- V zones for the reclaimed
water system construction. Develop a pumping scheme
for the ash storage basin drainage. Develop detention
basins for the drainage of .\RP dome area. Develop site
storm drainage management plan.
,\ccomplishments:
Site drainage system is under construction.
Senior Environmental Engineer, Chesterfield
Emission Enhancement Project, Dominion
Generation, Chester, VA, OS/2003 - Present. This
project is to rede\'elnp Chesterfield Emission
Enhancement Project located in Chester, Virginia.
De\'elop \'ariable pumping rates and sump dimension
and underground drainage system for Gypsum area,
Limestone area, and Yard site drainage.
Accomplishments:
Site drainage system is under construction.
Lead Hydraulic Engineer, SR3 (US 19) Widening,
Georgia Department of Transportation, Georgia,
Sumter County, GA, 03/2006 - 04/2006. The project
designed the widening of approximately 5.5 miles of
State Route (SR) 3 in Sumter County, Georgia to meet a
projected traffic volume of 7500 vehicle per day.
Develop hydraulic & hydrological report for the SR 3
bridge over Bear Branch for the replacement with
parallel 120 ft long rein forced concrete deck girder
bridge. Develop hydraulic & hydrological report for the
SR 3 bridge over ~[uckaloochee Creek for the additional
parallel 240 ft long reinforced concrete deck girder
bridge. Design culverts for the drainage of road nmoff.
Design sediment and erosion control for road
cons tructton.
Accomplishments:
SHAW ENVIRONMENTAL, INC.
2
JONG-CHIANG SHIAU
OGC122006T
.
-'
<{
If)
o
"'-
o
0:
"'-
If)
I
f-
"'-
o
UJ
Cl
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Hydraulic & hydrological reports ha\'e been accepted by
Georgia DOT for construction permit.
Lead Hydraulic Engineer, Air Force Bases (AFB)
Housing Privatization Projects, US Army, N.E.,
Hanscom AFB, MA, 09/2003 - 04/2006. The
projects, included de\'elopment and renO\'ation of
existing numbers of AFB housing pri\'atization and its
. .
maintenance serVIces.
Directed the preliminary stormwater collection and
drainage system to support the development of AFB
I-lousing Pri\'atization projects for Hanscom, t\11\.
Accomplishments:
Stomwater discharge permit is obtained and project is
under construction.
Lead Hydraulic Engineer, Wilson Hill Wildlife
Management Area Improvements (WHWMA),
10951, New York Power Authority (NYPA), St.
Lawrence-FDR Power Project, Massena, N.Y.,
08/2004 - 12/2004. The project, located at the south
shore of St. La\vTence Ri\'er near Massena, N.Y.,
included the de\'c1opment of the design criteria and
engineering planning for the construction of pool water
le\'el control structures, dike rehabilitation, New Road
Dike construction, and siphon outlet for \'\'ilson Hill
Wildlife t\lanagement Area, NYPA
Directed the design de\'Clopment of the construction of
pool water level control structures, dike rip rap
protection, siphon outlet for lowering pool water level,
and dike seepage for \'\'ilson Hill \\!ildlife t\Ianagemcnt.
Lead Hydraulic Engineer, Steward Avenue Para-
Transit facility Modifications, Long Island Bus,
Nassau County, NY, 03/2004 - 11/2004. The project
improved and modified the existing Steward Avenue
Para-Transit stormwater drainage system and facilities
for use of Long Island Bus terminal.
De\'eloped a drywell drainage system for the site and
submitted for drainage recluirement approval from
Nassau County Department of Public Works (DP\'\0.
The storm drainage system was approved by DPW on
October 4, 2004.
Accomplishments:
SHAW ENVIRONMENTAL, INC.
06C122006T
The design of stormwater drainage system and analysis
arc completed.
Lead Hydraulic Engineer, MOX Fuel Fabrication
Facility (MFFF), US Department of Energy,
Chicago Operation Service, Savannah River Site,
SC, 09/2004 - 09/2004. The project developed the
Mixed Oxide (MOX) Fuel Fabrication Facility (~IFFF)
to produce completed MOX fuel assemblies for use in
domestic, commercial nuclear power reactors.
Reviewed stormwater drainage system computed using
I-Iydratlow by Intelisoh-e for MOX Fuel Fabrication
Facility Site in South Carolina.
Lead Hydraulic Engineer, IROQUOIS Gas
Transmission System, IROQUOIS, Bronx, NY,
08/2002 - 07/2004. The project designed and
constructed the compression station for gas transmission
system in Bronx, New York.
Pro\'ided storm runoff analyses of a subsurface drainage
perforated piping system, for Hunts Point Compression
Station, Bronx, New-York permit application.
Percolation rates and groundwater ele\'ations on site
were e\'aluated. Storage \'olume within dry soils was
considered to retain the excessi\'e peak tlood resulted
from a server storm.
Lead Hydraulic Engineer, Formerly Used Sites
Remedial Action Program (FUSRAP), Maywood
Superfund Site, US Army Corps of Engineers,
Maywood, NJ, 12/2000 - OS/2004. The project,
located in Maywood, Nj, designed and constructed
necessary for the mediation of low le\'el radioacti\'e soil
at site.
Directed hydrological and hydraulic studies for existing
site and excavation. Determined peak pumping rate
required for dewatering seepage and surface water within
an exca\'ation of each cluster. Designed a bypass
drainage system during construction.
Lead Hydraulic Engineer, State Route 96 Widening,
Georgia Department of Transportation, Georgia,
Taylor County, GA, 02/1999 - 04/2004. The project
designed the widening of approximately 8.5 miles of
State Route (SR) 96 in Taylor County, Georgia to meet a
projected traffic volume of 4425 vehicle per day.
JONG-CHIANG SHIAU
3
.
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
UJ
-'
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
f-
.~
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
0::
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Directed hydraulic /hydrological studics for the
expansion of state 8.5 - mile roadway crossing in
Georgia. Investigation included backwater prediction
for Bea\'cr Creek, culvert sizing for road crossing, and
sediment-monitoring program during construction.
Directed the drainage calculation for railroad
coordination of project FLF-S..J.O (8) Taylor County,
Georgia to demonstrate no backwater impact from
railroad culverts as a result of discharges drained through
SR 96 drainage pipes.
Principal Geotechnical Engineer, Transit way
Maintenance Facility, Massachusetts Bay
Transportation Authority, Boston, MA, 07/2001-
09/2001. The project planned and designed Transit
\,\'ay J\Iaintenance facility at south Boston, J\L\.
Provided storm runoff analyses and designed a
subdrainage piping system and a lift pumping system of
sitc drainage for Boston \'\'ater and Se\ver Commission
permit application. i\n off-line oil! water separator \vas
designed to detain and treat the storm first flush.
Principal Geotechnical Engineer, Londonderry
Cogeneration Facility, AES Londonderry, LLC,
Londonderry, NH, 08/2000 - OS/2001. The project
designed and planned the construction of Londonderr~'
cogeneration facility at Londonderry, NH.
Directed hydrological studies to delineate the \vatcrshed
basin and corresponding storm \vater runoff associated
with the cogeneration facility site and to determine peak
flows during storms. Designed outflow structures and
detention pond facilities to maintain proper discharge
rate. Designed an underground drainage system to
relie\'e uplift pressures and control ground\V'ater level
during cons truction.
Principal Geotechnical Engineer, Crete Generating
Station, Crete Energy Venture, LLC, Crete, IL,
03/2001- 04/2001. The project designed and
constructed power generation station at Crete, II..
Directed hydrological and hydraulic analyses for drainage
through and adjacent to the site and designed a
detention pond to detain the disturbed sediment and
control the post-development discharge rate within an
SHAW ENVIRONMENTAL, INC.
OGC 122006T
allowable release rate. Cuh-erts were sized to cOl1\'ey the
site drainage across the access road offsite.
Principal Geotechnical Engineer, Rail Spur, Big
Brown Steam Electric Station, Texas Utility, TX,
09/1997 - 04/2001. The 2S-miles Big Brown Rail Spur
in Taxes was designed and constructed. Rail
embankment, drainage facilities and the associated
erosion protection were designed.
Directed designs of drainage cuh-ert structures and
trestles for a new 2S-mile rail spur. Predicted 2S-year
and 100-year peak flows at stream crossings. Computed
backwater flow and the sizing of drainage facilities.
Calculated erosion potential and designed erosion
protection measures. Determined flooding boundaries
upstream and downstream of the rail to meet hydraulic
design requirements. Designed an underground
drainage system for dewatering of coal pile storage area.
i\ll drainage flows at stream crossings meet FEJ\L\
requirements and eliminate el1\'ironmental impact.
JONG-CHIANG SHIAU
4
.
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Barry Singer
Education
~I.s., Engineering r-Ianagement, Northeastern
UniYersity,1974-
~LS., Ci\'il Engineering, Northeastern University, 1969
B.S., Ci\'il Engineering, Northeastern University, 1967
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
Reg istrations
Professional Engineer: Structural, AR, FL, ~IE, NH,
NY, V,\
Professional Engineer: Ci\'il, C\
Background Summary
t\Ir. Singer has oYer 39 years of experience in
engineering and management involving a variety of
industrial projects. Currently, his primary work il1\'okes
ci\'il, architectural, and structural design of industrial
projects. His experience includes new construction and
expansion of existing facilities.
As a Lead Engineer, t\[r. Singer's responsibilities include
supervising the design and drafting of ci\,il work,
foundations, structural steel, and reinforced concrete. In
addition, Mr. Singer is invoked in conceptual planning,
preparation of budget appropriation reports,
specification \\Titing, and coordination with other
disciplines and construction management. His work also
il1\'okes consultation with clients, \'endors, and
contractors. ~Ir. Singer has used computer-aided
analysis and design extensively for power plant
equipment structural supports, paper machine structures,
and other multi-stof\' frames.
~Ir. Singer has recently been engaged in the ci\'il,
structural, and architectural design of numerous
industrial facilities for the power industry and for
military facilities. His experience includes new Flue Gas
Desulfirization Retrofit Projects in Baltimore, ~ID;
Cogeneration facilities in Utah and New York and
chemical agent disposal facilities in Tooele, UT;
Aberdeen, ~ID; and Newport, IN; and an HMX
production facilities in Marshall, TX. His fossil
experience includes coal! emissions environmental
projects and major equipment retrofits for Tampa
I SHAW ENVIRONMENTAL, INC.
OGC122006T
Electric Company and New England Power Service
Company.
~Ir. Singer also \vas engaged as a Structural Engineer for
a major environmental engineering consultant where he
engineered and supen'ised the design of a \'ariety of
structures including bridges, sanitary engineering
facilities, and manufacturing facilities.
Relevant Experience
01/1986 - Present, Senior Lead Engineer,
Shaw Environmental & Infrastructure, Inc.
As Lead Engineer, t\Ir. Singer is responsible for the civil,
architectural, and structural design in the Civil-Structural
Division from the conceptual to the construction phase.
He has also selTed as Project Engineer for structurally
oriented projects. p,Iajor projects include the following.
The following is a summary of key projects:
Lead Civil/Structural Engineer, Brandon Shores
FGD Project, Constellation Energy, Baltimore MD,
02/2005 - Present. ~Ir. Singer is presently the Lead
Ci\'il-Structural Engineer for an FGD project for Units
& 2 at the Brandon Shores power plant. .'\ cost estimate
with plus/minus 5% accuracy was required and was
itemized by major subs~'stem islands and my major
equipment within the islands. The eCluipment includes a
new four hundred foot high chimney with two twcnty-
nine foot diameter flues, two absorbers, limestone and
gypsum material handling and storage. General
arrangements were made, soil borings and geotechnical
analysis was completed, and design and analysis of the
absorber, absorber building and stack foundations were
made.
Lead Civil/Structural Engineer, Currant-Creek
Power Project, Pacificorp, Mona, UT, 11/2003 -
Present. The Currant-Creek Power Project im'oh'es the
construction of a new 450 ~[\V combined cycle plant.
The major equipment includes a two HRSGs, two
Combustion Turbine Generators, a Steam Turbine
Generator, and an l\ir Cooled Condenser. The project
involves the design of an Administration/\'\'arehouse
Building and an enclosure around the STG. New
fencing, evaporations ponds and roads were rccluired for
this facility.
BARRY SINGER Q
.
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
o
-'
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Lead Civil/Structural Engineer, Ravenswood
Cogeneration Facility, KeySpan Energy, Long
Island City, Queens NY, 01/2001- 11/2003. The
Ra\'enswood Cogeneration racility il1\'oh-es the
Construction of a new 250 M\V combined cycle plant.
The major equipment includes a HRSC, and Steam
Turbine Generator, a Combustion Turbine Generator
and an Air Cooled Condenser. The project involves the
design of a Powerhouse Building with the Air Cooled
Condenser on the roof, a \'\!ater Treatment Building, a
Gas Compressor Building, new roads and numerous
\'ard structures.
A wards/ Client Commendations:
This plant was written up in Power magazine as one of
the best new plants built in 2003.
Lead Civil/Structural Engineer, VX Full Scale
Plant, U.S. Army Program Manager for Chemical
Demilitarization, Newport, Indiana, 03/1997 -
01/2001. This project il1\'oh-es the design of the
facilities and structures to house the equipment required
for the N e\vport Chemical Agent Disposal Facility used
for processing \rx (sarin gas) at Newport [\rmy Depot,
N C\Vport, TN. The project entails the design of new
roads, fencing, drainage, eight ne\v buildings, and
numerous outside concrete equipment and tank
foundations. t\[r. Singer's responsibilities also included
interfacing with the Systems Contractor during the final
design and construction phase.
Lead Civil/Structural Engineer, HD Full Scale
Plant, U.S. Army Program Manager for Chemical
Demilitarization, Aberdeen, MD, 04/1995 - 02/1997.
This project il1\'olves the design of the facilities and
structures to house the eCluipment requi.red for the
Aberdeen Chemical Agent Disposal Facility used for
processing I-ID (mustard gas) at Aberdeen Proving
Grounds. The project entailed the design of new roads,
fencing, drainage, ele\'en ne\v buildings, and numerous
outside concrete equipment and tank foundations. Mr.
Singer's responsibilities also included interfacing with the
Systems Contractor during the final design and
cons truction phase.
Senior Structural Engineer, Building Inspection,
Confidential Client, Los Angeles, CA 02/1994 -
03/1995.
I SHAW ENVIRONMENTAL, INC.
OGC 122006T
Lead Structural Engineer, Coal Compliance Project,
New England Power Service Company, Somerset,
MA, 10/1944 - 03/1995.
Senior Structural Engineer, Structural Engineering
Support, Tampa Electric Company, Tampa, FL,
08/1992 - 01/1994.
Lead Civil/Structural Engineer, Capital
Appropriation Report - Greenfield Mill, Scott Paper
Corp., Newman, KT, 01/1991- 10/1991.
Lead Civil/Structural Engineer, Miscellaneous Pulp
and Paper Mill Projects, Georgia Pacific
Corporation, Plattsburgh, NY, 04/1987 - 08/1991.
Lead Civil/Structural Engineer, Mill Expansion,
Confidential Client, Chesapeake, VA, 05/1990 -
04/1991.
Lead Civil/Structural Engineer, No.1 Tissue
Machine Rebuild, Kimberly-Clark Corp., New
Milford, CT, 05/1988 - 11/1989.
Lead Civil/Structural Engineer, Paper Machine and
Reel Storage System, Champion International
Corp., Deferiet, NY, 12/1988 - 06/1989.
Lead Civil/Structural Engineer, Pulp Mill
Expansion, Georgia-Pacific Corp., Plattsburgh, NY,
04/1988 - 08/1988.
Lead Civil/Structural Engineer, Stock Preparation
System, Mohawk Paper Co., Waterford NY, 01/1987
- 04/1987.
Lead Civil/Structural Engineer, No.3 Paper
Machine Rebuild, Little Rapids Corp., Potsdam,
NY, 05/1986 - 11/1986.
Lead Civil/Structural Engineer, Cauticizing
Building, James River Corp., Berlin, NH, 05/1986 -
10/1986.
Lead Civil/Structural Engineer, New Foundations
(No.1 Paper Machine) and Renovations (No.2
Paper Machine), Mohawk Paper Company,
Waterford, NY, 06/1986 - 08/1986.
West Springfield, MA, 03/1986 - 06/1986
BARRY SINGER 0
.
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
<:J
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
o
-'
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Lead Civil/Structural Engineer, Miscellaneous
Studies, Reports, and Estimates, Numerous,
Numerous, 01/1986 - Present.
. Boise Cascade Corp. - Rumford, ME
. City of Lakeland Power, Lakeland FL
. Champion International Corp. - Bucksport, ME
. China Light and Power - I-long Kong
. Constellation Energy - Baltimore, MD
. Dominion Chesterfield - Chester V1\
. Eastern Fine Paper Co. - Brewster, ~IE
. Finch, Pruyn & Co., Ine. - Glens Falls, NY
. Fraser Paper Ltd. - i\ladawaska, t\[E
. Great Northern Paper Co. - t\Iillinocket, t\IE
. Hollingsworth & Vose Co. - East Walpole, MA
. International Paper Co. - Corinth, NY
· James R.i\'cr COlV. - Fitchburg, MA
. James River Corp. - South Hadley, ~L\
. James Ri\'Cr Corp. - Gro\'eton, NI-I
. James Ri\'er Coq). - Gorham, NY
. LP Samoa Pulp ~Iill - Samoa, C\
. Lydall, Ine. - Green Island, NY
. i\Iadison Paper Industries - Madison, i\IE
. i\lonadnock Paper ]\Iills Ine. - Bennington, NI-[
. Nekoosa Papers, Ine. - Nekoosa, \\'1
. Nckoosa Papers, Ine. - 1\shdO\vn, AZ
. Nimrod Press Co. - Boston, t\L\
. Patriot Paper Co. - Hyde Park, ]\L\
. Tampa Electric Company - Tampa, FL
. The Narragansett Electric Co. - Pro\'idence, RI
. Thermo Electron Corporation - Waltham, ~L-\
. United Parcel Service - Little Rock, AR
. U.S. [\rmy Corp of Engineers - I-Iunts\'ille, AL
04/1974- 01/1986, Structural Engineer,
C.T. Main Inc., Pulp & Paper, Boston, MA
Chas. T. Main Inc., Boston, MA, 1974 1986. As a
Lead Engineer, Mr. Singer was responsible for the
stnlctural engineering a numerous Pulp and Paper
facilities from the preliminary planning stage, through
the complete engineering phase, to liaison with the field
representatives. STRUDL computer programs were
used extensively for gra\'ity, wind, and seismic design
and analysis. Also, Mr. Singer was responsible for the
demolition of the existing paper machine buildings. Mr.
Singer was invol\'ed with field engineering for piling
I SHAW ENVIRONMENTAL, INC.
OGC 122006 T
installation and structural steel erection. t\Ir. Singer was
il1\'oh-cd with turbine-generator support frames and its
housing adjacent to the boiler.
06/1967 - 01/1974, Structural Engineer,
Metcalf & Eddy, Structural, Boston, MA
t\Ir. Singer was a Lead Engineer for numerous
\Vastewater Treatment Facilities. I-Ie also served as a
Design Engineer, performing computations and
supen'ising drafting of working drawings for projects
that included bridges, buildings, and sanitary engineering
facilities.
06/1963 - 06/1967, Co-Operative
Education Student, Northeastern
University, Civil Engineering, Boston, MA
As Engineering Assistant, assignment included
sltn'eying, drafting, and construction supervision for
\'arious projects including roadways, school buildings,
water mains, and playgrounds.
BARRY SINGER 0
.
-'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
'"
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
1_
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Song Kai Van, Ph.D., P.E.
Senior Staff Consultant
Education
Ph.D., Civil/El1\'ironmental Engineering, Louisiana
State University, 1989
M.S., \Vater resources, Colorado State University, Fort
1983
B.S., Hydraulic Structure Design & Construction, Beijing
College of Hydraulic Engineering, 1964
Registrations
El1\'ironmental Professional: Nationwide
Professional Engineer: Ci\'il, L\
Background Summary
Dr. Yan has over thirty years of \vork experience which
includes surface and groundwater hydrology, surface
water and groundwater modeling, air modeling, dam and
reservoir design, Hood control planning and
management in \vater resources, \vater supply
distribution modeling, storm water management, coastal
area land subsidence and salt\vater intrusion,
contaminant transport, grounchvater assessment,
remediation, permitting, risk assessment, litigation,
computer graphics and modeling; computer
programming, and project management.
Dr. Yan has extensi\'e experience in grounchvater Hmv
and contaminant transport modeling and has been
responsible for many projects from Department of
Energy, Department of Defense (naval bases and air
force bases) and other commercial clients. Dr. Yan's
experience in groundwater modeling includes using
many popular software such as ~IodHow, ~rf3D,
RT3D, IL\ND3D, Sutra, Femwater, and numerous
other models. He also has experience in many pre- and
post-processors and optimization soft\vare such as
G~IS, Visual ~IodHow, Visual Groundwater,
Groundwater Vista, t\IGO, so~ros ctc. Because of his
knowledge on surface water hydrology and surface water
modeling, he is able to incorporate many surface water
management modules to l\IodHow (such as LAKE
module). Many of the groundwater modeling projects
he did invoked the migration of petroleum products
SHAW ENVIRONMENTAL, INC.
OGC122006T
such as BTEX, diesel or other fuel and chlorinated
hydrocarbons, both in unsaturated zones and saturated
zones. Dr. Yan is also familiar with EP A's HELP model
used for the evaluation of leachate in several landfill
systems and is familiar with many aspects of landfill
design and construction.
Dr. Yan also performed surface water modeling for
many projects in the United States. He is familiar with
US Army Corps of Engineers' water quality models such
as SMS (Surface Water t\Iodeling System - TABS
programs, which includes module FES\'\'1\IS that can
deal \vith scour problems at bridges, and IZ1\L-\2, lZ1\L-\4,
SED2D that can solve How, \'elocity, sediment and
contaminant transport), watershed models such as W'1IS
(watershed modeling system), HSPF, WASPS, SWMl\r,
Cormix, Qual-2e and La-Qual. He did in-stream
dilution calculation, sediment transport in streams,
mixing zone calculation for man)' clients in Louisiana.
He is also familiar with the Corps of Engineers'
programs such as I-IECl (HEC-I-Il\IS), HEC-2 (HEC-
R.r\S) and I-IEC-6 and applied them to se\'eral U.S.
clients' sites. He used EPA's B,-\SrNS watershed model
to evaluate T~IDLs (total maximum daily load) in
strcams. Reccntl~', he worked on a projcct for thc City
of Hammond to define Tl\IDL's in t\vo major streams in
the Hammond area using a screening model and a
modified La-Qual model. I-Ie also used I-IYDIL\ and
S\,\'~I~[ models to calculate and design storm
management systcms for chemical plants, railroad
stations and urban Hooding areas. Dr Yan has rccently
accomplished a Hood mitigation project for the City of
New Orleans. He used PCS\VMl\I to simulate different
Hood mitigation alternati\'cs and came up with a \'iablc
and economic solution for the Clean'iew and Earhart
Interchange area in Jefferson Parish, New Orleans.
Dr Yan has developed se\'eral types of application
software. These include STRAL\N (a 2-D computer
code that simulates and predict land subsidence and salt-
water intrusion in coastal area); DNAPMIG (a DNAPL
potential migration software); a windows driven pre- and
post-processor for the KGS Slug test program. Other
soft\vare de\'eloped were pre- and post-processors for
SWANFLO\V (a 3-D three-phase simulator) and for
SUTRi\ (a 2-D USGS variable density How and
transport model); modifications of a particle tracking
SONG KAI YAN, PH.D., P.E.
.
-'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
a::
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
software, P ATH3D; development of a link for Terrabase
(a proprietary database software de\'eloped by Integrate,
Inc) to create contours automatically; development of a
windows driven software to automatically creatc
graphically results using Excel spreadsheet for reporting
for PPG Industries. He was invited by the authors of
t\[OD;\C - an "automatic" groundwater calibration code
to beta-test the program since 1997. This code was
successfully applied to more than 10 major projects
before it was incorporated into a famous groundwater
pre- and post-processor, Groundwater Vista in 2004.
Dr. Yan is currently an adjunct professor in the Civil and
Environmental Department at Louisiana State
Uni\'ersity, teaching "\\'ater Distribution and
\'\'aste\vater Collection," " Grounchvater," "Hydrology,"
and "Hydraulics." In these classes, he teaches Heastad
Methods that include Flowmaster, WaterCad, StormCad,
SewerCad, and Cuh-ert~laster. I-Ie also teaches
EP/\NET2, HEC-HMS and HEC-IL\S to the students.
Dr. Yan \vorkcd for the i\[inistl\' of \\'ater Resources
and Electric Power in China for O\'er twenty years as an
engineer before he came to the States and was involved
in planning and designing of some hydraulic structures.
He also was hcavih' itwoh-cd in the assessment of water
resources, planning and management of water resources
in the Haihe and Ruanhe Ri\"Cr Basins in North China.
He was il1\'oh-ed in the design of Panjiakou Reservoir,
Sixiali Dam and Du-Liu and Beidakang Floodways in
northern China.
Dr. Yan was the president of the American \\'ater
Resources Association (Louisiana Section, 1993-(994).
He was a member of the International i\ffairs National
Committee of this organization. I-Ie serves as "Ground
\,\'ater" journal's associate editor from January 2006. Dr,
Yan is currently a registered Environmental Professional
and a registered Professional Engineer. He is currently
an adjunct professor in the Civil and Environmental
Engineering Department of Louisiana State University
and a member of the advisory board for that
Departmcn t.
Relevant Experience
02/1998 - Present, Senior Staff
Consultant, Shaw Environmental &
Infrastructure, Inc.
Performing surface and groundwater modeling for
clients; supervision, re\'ie\v and coordination of
modeling effort, engineering effort as distinguished
technical leader; co-chair of Shaw E & I's civiV structural
engineering group; preparation of technical portions of
major modeling/ design engineering proposals. Provide
technical mentoring for other modelers in groundwater
modeling within the company.
Gave presentations and lectures in some major research
institutes and the t\[inistry of Water Resources in China.
Presented papers at Shaw E & I Technical Symposium
and contributed papers at other national conferences.
Received t\vo Chinese delegations from the ~[inistry of
\'\'ater Resources (im'ited by Louisiana Department of
Natural Resources) and t\vo Chinese groups to \,isit
Shaw for Nuclear businesses. Did translation on both
OCClslons.
Taught "Water Distribution and \,\'aste \,\'ater
Collection," "Hydrolog~'" and "Hydraulics" for the
Department of Ci\'il and Environmental Engineering,
Louisiana State University as an adjunct instructor. A
member of the ach-isory board of Department of Civil
and Em'ironmental Engineering, Louisiana State
Uni\'ersit\,. i\n associate editor for "Ground \,\'ater"
journal startingJanuary 2006 for a three year term.
Principal Modeler, Groundwater Flow and
Contaminant Transport for Plum Brook Ordnance
Works, US Corps of Engineers (Nashville District),
Sandusky, OH, 12/2004 - Present. Perform 3-D
groundwater flow and transport modeling for the site to
support remedial action alternatives to be considered in
the Feasibility Study.
Flow model calibration has been accomplished and the
results were presented to COE and EP A in December
2004 without negative comments. Currently, setting up
of contaminant transport model is underway.
SHAW ENVIRONMENTAL, INC.
2
SONG KAI YAN, PH.D., P.E.
OGC122006T
.
-'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
(!)
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Principal Modeler and Engineer, Flood Study for
Jefferson Parish, New Orleans, 2314, Jefferson
Parish, Jefferson Parish, New Orleans, 07/2004-
Present. \,\'ork for Shaw Coastal and UPI on the
mitigation of flooding at the Interchange of Clean,iew
Pbvay and Earhart Expressway. The Army Corps of
Engineer's HEC-H~IS model was used to generate
rainfall-runoff relationship. PCS\VMi\I model was used
to calibrate the model and to predict flooding condition
under current physical condition and 19 other
engineering modification options and 10-, 25-, 50-, and
100-year storm condition. Currently, the option that can
solve the flooding at the Interchange under lO-year
storm is studied based on new configuration and post-
[(atrina conditions. Final report will be submitted
sometimes in February or i\[arch, 2006
Preliminary report has been accomplished and a final
report is pending on new survey data and information
based on post-Katrina conditions.
Jefferson Parish and its consultant (BeG -Brown,
Cunningham, Gannuch) app[()\'ed of the model
calibration and the proposed options in the model runs.
Final apprO\'al is pending due to new model runs based
on new information.
Principal modeler, Moody Air Force Base - Fate and
Transport Modeling, , US Corps of Engineers,
Valdosta, GA, OS/2001- Present. Perform 3-D
grounchvater flO\v and transport modeling to support
\'arious remedial action alternati\"Cs, including pump-
and-treat (vertical and horizontal wells), in-situ
biotreatment etc. Flow model was calibrated
successfully with state-of-art models.
Six different sites were modeled indi\'idualh' and
modeling reports submitted for each site. Currently,
site-wide flow and transport modeling has been
accomplished and report preparation is underway.
Commendation to the Shaw Moody team from
Department of f\ir Force for the Superior Performance
in preparing the Correction Action Plan for the
subsurface remediation of SS-38 site. The Plan was
approved by both t\.Ioody AFB and the State of Georgia.
Senior Modeler, West Virginia Ordnance Works -
Fate and Transport Modeling, US Army Corps of
Engineers, Mason County, WV, OS/2000 - Present.
Simulate and predict flow and transport of three
explosives, 2,4,6-TNT, 2,4-DNT and 2,6-DNT in the
three water bearing zones and provide results and
support for the remediation options in the feasibility
study to protect \vater cluality in the intermediate and
deep sands as well as the potential water usage at the
property boundary.
Two intermittent modeling reports have been
accomplished and the final report is undenvay pending
on new investigation results. 'I\vo presentations of the
modeling results were presented to COE, EPA and
\'(!VDEP.
Commendation to the Shaw team from COE for
performing "an excellent job in contributing to team
scoping and meeting very tight schedules for proposal
development and submission."
Principal investigator and modeler, Derivation of
Soil and Groundwater Concentrations Protective of
Surface Water and Sediment for Longhorn Army
Ammunition Plant, Texas, U.S. Army Corps of
Engineers (Tulsa District), Longhorn Army
Ammunition Plant, Karnack, TX, 10/2004 - OS/2005.
The purpose of this modeling effort was to identify
those sites at Lf-L-\AP where COCs in soil or
groundwater represent unacceptable human health risk.
Ele\'en sites were evaluated in terms of the
concentrations resulted in migration to the nearby
stream and groundwater. Concentration level protective
of surface water, groundwater and sediment were
derived. The simulated results were intended to be used
for selection of risk-based alternati\'es, which are not
necessarily alternati\'es il1\'olving clean up, in the
feasibility studies for the sites.
Draft final report has been submitted to the plant, EP [\
and state agency in ~Iay 2005. No comments have yet
been fed back.
Principal Modeler, Myrtle Beach Air Force Base -
Fate and Transport Modeling, etc., Department of
Air Force, US Corps of Engineers, Myrtle Beach,
SC, 01/2000 - 03/2005. 3-D groundwater flow and
transport modeling was performed at SD-24, Fr-ll, and
Building 50S sites to support feasibility study and legal
suit case. Different scenarios of remedial actions were
SHAW ENVIRONMENTAL, INC.
3
SONG KAI YAN, PH.D., P.E.
OGC122006T
-
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
<!l
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
0:
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
studied. A sophisticated computer code (~IODAC) was
used to estimate flow parameters such that the head
distribution matched observation very well.
t\Iodeling reports for SD-24 and FT-ll were submitted.
Building 505 site modeling was performed initially three
years ago and was transferred to Greensville office this
year due to tight schedule.
Clients were satisfied with the modeling results.
Principal Investigator, Hillside 137 stability and
drainage design for Los Alamos National Lab,
823830, Los Alamos National Laboratory, Los
Alamos, NM, 01/2001- 12/2003. (I) Evaluation of
major culverts after forest fire. (2) Investigation and
design of the storm \vater drainage system at 137 Hill-
slope to protect the slope from further erosion.
Hydraulic calculations and hydraulic design were
accomplished and reports were drafted and submitted to
L\NL. The structure design was done by Stone and
\'\. ebs ter.
Principal Modeler, Tinker Air Force Base Well
Head Protection Study, Tinker Air Force Base,
Oklahoma City, 02/2003 - 11/2003. Use a 3-D
groundwater model to delineate \vellhead protection
areas in a 3-D perspecti\'e.
The model was well calibrated and the results were far
superior to the pre\'ious ones which \verc based on
EP;\'s early version ofWI-IPA model (two-dimensions)
and overestimated the area dramaticall)"
Principal modeler, Shaw Air Force Base - Fate and
Transport Modeling, Department of Defense,
Sumter, SC, 01/2001- 07/2002. A 3-D grounchvater
and transport model was developed for the Shaw Air
Force Base to e\'aluate different remedial action
alternatives for the CMS (corrective measure study).
The flow model and the transport models were "very
\vell" calibrated based on the investigation information
we had at that time. Doubts \vere raised as to the actual
velocity of the groundwater that allowed TCE to migrate
o\'cr 6000 ft over the past 45 years. The aCluifer test data
did not support this kind of velocity. Later study on
isotopes age revealed that there very likely exists a
SHAW ENVIRONMENTAL, INC.
06C122006T
preferential patlnvay in which groundwater was moving
at higher velocity than the surrounding areas.
Draft modeling reports were accomplished and
presentations were made to the clients and the agencies.
SONG KAI YAN, PH.D., P.E.
4
.
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Sylvester N. Yongho, P.E.
Education
~LS., Structural Engineering, Northeastern Uni\'ersity,
1991
B.S., CiYil Engineering, Texas Tech University, 1988
Registrations
Professional Engineer: Structural, GA, ~L\
Background Summary
~Ir. Yongho has 13 years of experience in the design of
\'arious transportation structures including highway
bridges, tunnels and railroad bridges for several state and
transportation departments. He has participated in the
inspection and rated over IOU bridges for the
~Iassachusetts Highway Department (MHD) in \'arious
capacities including the role of lead structural engineer in
the emergency arch inspection and ratings contract for
rdHD. l\mong the analytical tools employed, was the
use of NDT (sonic/ultrasonic) methods to determined
the extent of deterioration in concrete arches as well as
the size and location of reinforcing steel.
l\Ir. Y ongho joined Stone & \\'ebster I:ngineering
Corporation (Stone & \'\'cbster) in October 1998 as a
Lead Structural Engineer in the Elwironmental and
Infrastructure Di\'ision. In his current capacity with
Stone and \\"ebster, he has written several engineering
reports for both t-.IHD and \' ermont Department of
Transportation (VDOT) and has taken part in several
marketing meetings with both ~IHD and VDOT. He
was the Project Engineer in the emergency arch
inspection and rating analysis project for the MHD. I-Ie
was the re\'iewer for the design of Union Pacific Rail
Spur Trestle over Clear Creek and Caney Creek. He
prepared the Bridge Type Study report for the Rail Spur
over Tehuacana Creek, all part of the Texas Utility's Big
Brown Steam Electric Station (S.E.S.) Rail spur project.
He prepared the Deck Replacement Project reports for
US 5 over 1-91 in Putney and US 5 over I-91 in
Hartland, for Vermont Agency of Transportation. He is
currently functioning as the Project ~Ianager for the
~IHD Bridge Design/Rating Projects.
SHAW ENVIRONMENTAL, INC.
OGC122006T
l\Ir. Yongho came to Stone & \'\'ebster, from T.Y. UN
International, Boston ~Iassachusetts where as Structural
Engineer, he was responsible for the redesign of Ramp
D-'L-\, a 4 span continuous post-tensioned multi-cell
concrete box girder bridge on caissons (part of the
Logan i\irport Terminal Roadways at the 1-90 Logan
Airport Interchange). I-Ie was also responsible for the
preparation of integrated construction shop drawings for
the south tower and south back spans of the Charles
River Cable Stay Bridge. Before that he was a Design
Engineer with f\SEC Corporation, Quincy,
t\Iassachusetts where he was the Lead Engineer in
se\'eral prestressed concrete bridges for the t\IHD
including integral abutment bridges. His responsibilities
also included the preparation of construction plans,
special prO\'isions and cost estimates. He was the
Design Engineer for the cut and cO\'er section of Ramp
F, approach Span #3 and a re\'iewer for the design of
Ramp D located at the I-90/I-93 interchange. All Part
of the Central Artery/Tunnel Project. He was also the
Design Engineer for sections CC02"\ and CC03A of
the South Boston Piers Transit \\'a\' tunnel.
~ Ir. Y ongho has pre\'iously \vorked as a Structural
Engineer with the ~Iassachusetts I lighway Department-
Bridge Design Section, Boston, !\Iassachusetts. i\t
~IHD, he \vas ilwoh-ed in the design of
Several bridge structures within the state of
Massachusetts. He has working knowledge of Autocad,
and se\'cral years of experience with design software
such as: STAAD, GTstudl and Conspan among others.
Relevant Experience
OS/2002 - Present, Lead Structural
Engineer, Shaw Environmental &
Infrastructure, Inc.
Design Engineer responsible for the design of several
bridge types from single span prestressed concrete
bridges to multi-span steel girder bridges.
Responsibilities included the de\'elopment of design
alternatives, sketch plans and final design. including the
preparation of construction plans, special provisions and
costs estimates. f\dditional responsibilities include
bridge inspections and ratings.
Other relevant experiences include the inspection and
preparation of a condition assessment report for
SYLVESTER N. YONGHO
.
-'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
I-Iydrobin Ash storage facility and the \vaterfront
Structures of the fuel handling terminal at Brayton Point
power station in Somerset, t\lA.
Other experience include the design of mat and pile
foundations supports for Ball Mills, compressors, steam
and gas turbines, motors and pumps at the Brunner
Island P A. Power plant.
The following is a summary of key projects:
Design Engineer, Route 2A over 1-95,
Massachusetts Highway Department, Lexington,
09/2003 - Present. Project ~Ianager/Engineer.
Responsible for the design of a four span continuous
steel girder bridge to be constructed in phases and
includes traffic management. Additional responsibilities
inclu~~d the preparation of construction plans, special
proVISions, costs estimates as well as construction phase
serVIces.
Design Engineer, Prospect Street over spring street,
612483.02, Massachusetts Highway Department,
Montague, 09/2002 - Present. Project
t\[anager/Engineer responsible for the design of a single
span prestressed concrete spread box beam on spread
Footings. Additional responsibilities included the
preparation of construction plans, special prO\'isions and
cos ts es tima tes
Design Engineer, Central Artery Tunnel - Contract
C09C2, 1-90/1-93 Interchange, Surface Restoration,
Massachusetts Highway Department, Boston,
10/2001- 06/2004. Responsible for the design of
retaining \valls along Ramp KK, Ramp CC, Ramp U.
Other responsibilities include the design of load
distribution slab and retaining walls over EPS structure
for Temporary Ramp KK. ,\dditional task involved the
re\'iew of shop drawings.
Design Engineer, Cross Street over B&M Railroad
,
Massachusetts Highway Department, Somerville,
06/2002 - 03/2003. Responsible for the final design
phase of the Through Cirder Superstructure and
modifications to the existing substructure. Additional
responsibilities included the preparation of construction
plans, special provisions and costs estimates.
10/1998 - OS/2002, Task Engineer, Shaw
Environmental & Infrastructure, Inc.,
Stoughton, MA
Design Engineer responsible for the preparation of
design alternatives for bridge projects, sketch plans and
final design. ,\dditional responsibilities include the
preparation of construction plans, special provisions and
cost estimates.
The following is a summary of key projects:
Design Engineer for ramp F (Sta. 20+00 to 22+67.7)
and Reviewer for Ramp D, Route 122 over Millers
River, Massachusetts Highway Department,
Orange, 10/1998 - 09/2001. Design of Railing/Barrier
support slab along Water Street. Preparation of final
cost estimates. Other responsibilities invoked the
re\'i~w of shop drawings and other construction phase
services.
Independent Reviewer of both substructure and
superstructure design, Big Brown Rail Spur, Texas
Utility, TX, 11/1998 - 07/2000. Independent Re\'ie\ver
for the Superstructure and Substructure design Union
Pacific-Trestle O\'er Clear Creek and Superstructure
design Union Pacific-Trestle m'er Caney creek.
Prepared the Type study and final design of the Rail
Spur O\'er Techuacana Creek.
Project Engineer, C2C Fiber, 13143, C2C Fiber of
Massachusetts, 1-495 Corridor, 04/1999 - 09/2001.
Conduit Attachments Responsible for bridge inspections
and ratings of o\'cr thirty bridges under contract with for
C2C Fiber, a fiber optic company as part of it's mainline
and lateral installation of fiber Optic cable along 1-495
from Plainville to Tewksbury using Virtis Bridge rating
software. Other responsibilities included preparation of
conduit attachment details on bridges.
Design Engineer, US 5 over 1-91, 12000, Vermont
Agency of Transportation, Hartland, 09/2000-
02/2001. Prepared the Engineering Report for the deck
replacement and substructure rehabilitation of US 5
overI-91 in Hartland, Vermont and US 5 over 1-91 in
Putney in Vermont. Both bridges are multi-span simply
supported composite stringer steel girder bridges on
skewed tangents. In these reports, the elimination of
deck expansion joints and a comparison study of the
Vermont Expansion Joint and the X.j.S. (Expansion
SHAW ENVIRONMENTAL, INC.
2
OGC122006T
SYLVESTER N. YONGHO
.
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
o
-'
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Joint System) joint system by Dow Corning was
undertaken.
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
a
f-
01/1998 - 10/1998, Project Engineer, T.Y.
Un International, Boston, MA
Project Engineer responsible for the preparation of
integrated construction shop drawings incorporating
bridge utilities, reinforcements, post-tensioning cables
for the Charles River Cable Stayed bridge. Other
responsibilities included the redesign of a four span
continuous cast-in-place post-tensioned multi-cell
concrete box girder.
The following is a summary of key projects:
Project Engineer, Central Artery Tunnel - Contract
CI9Dl, Charles River Cable Stay bridge,
Massachusetts Highway Department, Boston,
01/1998 - 10/1998. Preparation of integrated
construction shop drawings incorporating bridge
utilities, reinforcements, post-tensioning and cables in
the struts and lifts I to 5 of the south tower and spline
beam of approach back spans to \vhich the cables are
attached. Other responsibilities included the
identification and resolution of conHicts in the post-
tensioned strand laHlutS.
Project Engineer, Central Artery Tunnel - Contract
C07D2, 1-90 Logan Airport Interchange,
MASSPORT Authority, Boston, 01/1998 - 10/1998.
Redesign of Ramp DTA, a four span horizontally cUlTed
continuous cast-in-place post-tensioned multi-cell
concrete box girder on drilled caissons. Other
responsibilities included the review of shop drawings for
other Logan l\irport terminal roachvay ramps including
the redesign of transverse post-tensioned tendons for
end beams, straddle bents and bent caps.
SHAW ENVIRONMENTAL, INC.
SYLVESTER N. YONGHO 3
06C122006T
.
-'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
'"
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Farouk F. Youssef, A.I.A.
Why Selected as Key Personnel for Contract
. Over 40 years experience in programming,
planning, conceptual design and development,
contractual administration, bid evaluation,
negotiation of contracts and construction
supervision
. Project Architect for several Governmental projects
with 000, DOS & DOE
Education
Master of Architecture, Architecture, MIT, 1970
Bachelor of Architecture and City Planning - Faculty of
Fine Arts, 1963
[Degree evaluated by The t\Iassachusetts Institute of
Technology (1LLT.) as its equi\'alcnt in 1970].
Registrations
Registered Architect: AZ, CT, FL, IL, IN, LA, KT, ~IE,
t\L-\, t\II, t\[0, NI-!, NJ, Ni\I, NY, NC, SC, 1\-\, RI,
Commonwealth of Puerto Rico, TX, VA and \'\"1.
Background Summary
t\[r. Youssef is a Registered ,\rchitect with O\'er 40 years
of di\'ersitled architectural background in the United
States, Canada, and Egypt comprehending all phases of
professional practice.
As Principal Architect and i\Ianager of the [\rchitectural
group, he has extensi\'e experience in programming,
planning, conceptual design and development,
contractual administration, bid e\'aluation, negotiation of
contracts and construction supervision. His projects
ha\'e included large-scale industrial complexes,
institutional facilities, housing, commercial projects,
office buildings, schools, hospitals, laboratories and
building renovations.
Holds an active security clearance and has worked as
Project Architect for several GO\'ernmental projects
involving Top Clearance Security (TS) projects (DOD,
DOS & DO E),
~ [r. Youssef joined Stone & Webs ter Engineering
Corporation (S\VEC) in ~Iay 1970. His responsibilities
consist of administration, project management and
SHAW ENVIRONMENTAL, INC.
OGC122006T
design. Duties ha\'e included supef\'ision of professional
staff, writing technical specifications, preparation of
estimates and workload forecasts, coordination of
architectural and engineering specialties, contact \vith
regulatory agencies, negotiation of contracts, awards and
construction SUpclTlslOn.
Relevant Experience
05/1970 - Present, Shaw Environmental
& Infrastructure, Inc.
Civil-Structural Division Staff (May 1970 to Present).
Principal Project Architect, responsible for the following
projects:
Representative Project Experience:
Power Plant Security Upgrades. i\[r. Youssef
designed security upgrades at numerous pO\ver plants
including: TV A-Sequoyah, t\Iillstone, Comanche Peak,
Seaver Valley, Maine Yankee, Connecticut Yankee.
~Iystic, Shippingport, Os\vego, Sig Send, Tampa,
Sa\'annah-Effingham Station, Lungmen, Rumford
Combined Cycle Power Plant, Londondcrry and others.
Imprm'ements included \'arious perimeter barriers,
reinforced perimeter fences, double fences (perimeter
and nuisance), blast protection, \,ital area protection,
\'ehiclc access road design, personnel and vehicle access
point improvements, and security system improvements.
Emergency evacuation routes \vere incorporated into the
access route imprm'ements. He coordinated the design
of emergency communication system upgrades.
I\t the Seaver Valley nuclear power station, ~[r. Youssef
was responsible for the architectural design, coordinated
the engineering of a primary access facility. The facility
is a two-story structure that functions as the personnel
access area and doubles as a training and administration
facility for the plant security personnel. It includes
intrusion detection systems, bullet resistant areas,
computer systems, and alarm systems, personnel
monitoring systems, offices, and mechanical equipment
areas.
Yankee Atomic Electric Company. ~[r. Youssef
developed conceptual designs of Emergency Operation
Facilities (EOF) for the following Massachusetts Towns:
Amesbury, Plum Island, Byfield, ~Ierrimac, Salisbury,
Newbury, Peabody and Newburyport. EOF facilities
were designed to provide emergency evacuation, and
FAROUK F. YOUSSEF
.
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
a
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
r.:>
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
a
f-
sheltering with appropriate communications capabilities
to handle emergency response. EOr was to house
police, fire department, FE~L-\, town officials and other
emergency personnel. The Peabody EO F was designed
and built incorporating it into an existing police
department building, with radiation hardening added.
New Fire and Police Station facilities were designed for
the towns of Salisbury and Newbury. Additional
facilities were also designed for various town halls and
schools to shelter and feed the population surrounding
the power plant in case of an e\'acuation or a natural
disaster. Farouk worked with other agency and
stakeholder to de\'elop emergency e\'acuation plans. He
participated with regulatory personnel, local emergency
response organizations, FEMA, and the public in
hearings on EOF development and emergency
e\'acuation planning.
American Embassy Office of Foreign Building
Operations, Department of State (DOS), Panama
City, Panama (Torre Miramar Building). ~Ir.
Youssef responsible for the architectural design,
coordinating and interface with various engineering and
security disciplines. Preparation of design documents
(drawings, specifications, reports, etc.) design, included
space planning, security upgrades and new emergency
e\'acuation stair\vays for a 16-story office building used
by ,-\merican Embassy personnel. Design included new
perimeter barriers to provide increased standoff
distances; a new emergency e\'acuation stairwell,
rein forcing parking garages agains t a ttack, balconies
protection, improved windows, and forced entry
resistant doors.
t\Ir. Youssef was in charge of the relocation of ISO
facility into the Torre ~liramar including design,
coordination with all other disciplines
American Consulate, Office of Foreign Building
Operations, Department of State (DOS), Panama
City, Panama. t\Ir. Youssef designed, coordinated
\'arious engineering disciplines and oversaw the
construction of the ,\merican Consulate in Panama City.
Work included floor plans, the hardening of the building
and numerous security improvements. Emergency
evacuation routes, shelters that can stand attack for few
hours until help arrives, security monitoring, perimeter
protection, and other improvements.
SHAW ENVIRONMENTAL, INC.
OGC122006T
Department of Energy Due Diligence Review "The
River Protection Project, Hanford, WA" (DOE).
~Ir. Youssef conducted a due diligence review of "The
River Protection Project, Hanford, \,(!A". The project
il1\'oh-ed the protection of the water\vay from
radiological impact from contaminated sites and
facilities. He re\.iewed the project design and
procedures, including emergency preparedness plans.
Aberdeen Chemical Agent Disposal Facilities,
Edgewood, MD (DOD) and Newport Chemical
Agent Disposal Facilities, Newport, IN (DOD). t\Ir.
Youssef designed buildings for the
treatment/destruction of chemical warfare agents at
both I\berdeen and Newport facilities. He coordinated
work, \vhich included the design of e\'acuation
capabilities, safety systems, fire protection,
communications systems, alarms, and intrusion
pre\'ention and detection.
Louisiana Ammunition Plant (RDX), Shreveport LA
(DOD). Mr. Youssef designed buildings for the
treatment/ destruction of the explosi\'e RDX. He
coordinated \vork, \V'hich included the design of
e\'acuation capabilities, safety systems, tu-e protection,
communications systems, alarms, and intrusion
pre\'ention and detection.
Massport Authority, Logan Airport Computer
Room, Security Access Upgrade, Boston, MA. t\[r.
Youssef designed the security upgrade of the Logan
I\irport. Shaw sen'ices included engineering, design, and
specifications of an access control system including a
centralized computer, multiple operator stations,
multiplexed fiber-optic communications, card readers,
and associated hardware. The s\'stem controls access to
the airs ide operations areas from fi\'e passenger
terminals and a general aviation terminal. The design
incorporated control devices for the doors and gates,
including emergency evacuation exits compatible with
security and fire marshal standards. The scope of
sen.ices also included continuing support to meet F,-\[\
access control requirements.
Office Building/Industrial/Commercial Projects:
. U.S. f\rmy Corps of Engineers, FUSRAP laboratory
Building.
· Shaw Headquarters Office Building, Baton Rouge, L.r\
FAROUK F. YOUSSEF
2
.
--'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
'"
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
'"
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
. Puerto Rico Power Co" San Juan, PR (Several
Projects)
. Enclave Realty Trust Office Building, Houston, TX.
. 51 Sleeper Street Office Building, South Boston, MA
. Charlton Switch Facility, MCI Telecommunication
Corp. Charlton, i\L\
. Auburn VPS Partnership, Ltd., Virgin Pulp Substitute
Recycling Facility, Auburn, ~[E
. Nantucket Cable Project, Candle Street Substation,
New England Power Co. Nantucket, MA
. Improved Plastic Facility, Gillette Co. Boston, ~L\.
. Gillette Seawater Intake Structure, South Boston, t\L-\
. Band Center for the 54-I st [\ir Force, Hanscom ,\ir
Force Base, Bedford, ~L-\
. Architectural Compatibility Plan "ACP" Hanscom Air
Force Base, Bedford, t\L\.
. Christian Science Church, Boston, t\L-\
. AT. Cross, Lincoln, RI.
. Cherry Hill Operation Center Office Building, Cherry
Hill, NJ
. Uni\'crsity of f\Iissouri Research Facility Upgrade,
Columbia, ~IO
. N[\CE Project (Recycled Fiber Plant) Scott Paper
Co., Owens\'ille, KY
. James Ri\'er Graphics Coating Facility in l'-[anor Park,
Scotland, England.
. Vevey Manufacturing Facility and 0 ffice Building,
Butner, N.C.
. Cranston Print \,\'orks, \Vebster, t\L\
Transportation Projects:
Project Architect for the design/ renovation of the
following projects:
Massachusetts Bay Transportation Authority
(MBTA). E\'erett Hea\'y Bus Repair Facility - Project
Architect responsible for the cOlwersion of a portion of
this facility to CNG. Tasks associated with this
assignment-included liaison with client and other team
members. Preparation of a conceptual design report,
which includes the conversion of portions of the existing
facility to CNG, the addition of a CNG fueling station
and the addition of a new preparation area (bus
wash/ reclaim) and paint booth.
Prepared a Roof Inspection/ Repair Report for the
95,000 square feet facility, including cost estimates.
Cabot Bus Repair Facility -Project Architect
coordinated the cOlwersion of this facility to CNG.
Responsible for all architectural modifications and
updating to meet current State and Federal Codes,
included liaison with client, state and local officials and
other members of the design team. Preparation of
specifications and construction estimates.
Interim Arborway Maintenance Facility -Project
Architect coordinated the design of this new
maintenance facility for both CNG and diesel buses.
. ~Iaintenance Facilities - Connecticut Department of
Transportation:
. Stamford Yard and maintenance facility (Stamford,
Connecticut)
. Bradley International Airport (t\lisc. Security and
Renovations \'\'ork)
. Windsor Maintenance Facility Office (\'\'indsor,
Connecticut)
. Darien ~Iaintenance and Repair Facility (Darien,
Connecticut)
. Fairfield t\Iaintenance Facility (Fairfield, Connecticut)
. Value Engineering Sen'ices & Design re\'iew for:
\'\-illington, Cornwall and Saybrook Repair and
i\[aintenance Facilities (CT)
PO\ver Projects:
Project ,\rchitect for the design of the following
projects:
. Spagnoli Road Energy Center, Plant and office,
~Ielville, Long Island, NY
. Ra\'enswood Co-generation Facility, Plant and Office,
Long Island City, Queens, NY
. Covert Generation Co. LLC, Plant and Office, Van
Buren County, I\II
. Londonderry Cogeneration Power Plant, and office,
Londonderry, N H.
. "Everton Combined Cycle Power Plant, "Everton, RI.
. PI-L-\-LAI Thermal Power Plant, Hai Doung
Province, Vietnam.
. Upper Peninsula Generating Co.- Presque Isle Station,
(Presque Isle, NY)
Parking Garages:
. Enclave Realty Trust Office Building, Houston, TX
SHAW ENVIRONMENTAL. INC.
3
FAROUK F. YOUSSEF
OGC122006T
.
-'
<{
If)
o
"'-
o
""
"'-
If)
I
f-
"'-
o
UJ
(!J
<{
"'-
~
f-
>=
UJ
I
f-
Z
o
Z
o
>=
u
a::
f-
If)
UJ
""
UJ
I
f-
o
f-
.i
If)
'!l
f-
UJ
UJ
I
If)
If)
I
f-
Z
o
o
UJ
z
4'
f-
Z
o
u
<{
f-
<{
o
"'-
o
UJ
""
::::>
If)
g
u
If)
Ci
""
o
UJ
If)
::::>
.
SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
Owner Representati\'e/ Project Architect for the
320,000 square foot, six-story office building and 1400
car, four-level parking garage. Design and design and
shop drawings review, coordination with pre-cast
manufacturer, selection of finishes, construction
supcr\'ision, interface with Architect, Contractor and
De\'eloper.
SHAW ENVIRONMENTAL, INC.
FAROUK F. YOUSSEF
4
OGC122006T
.
.
. a.
---'..
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
Complete one SectIon F for each proJect.)
20. EXAMPLE PROJECT KEY NUMBER
001
21. TITLE AND LOCATION (City and State)
22. YEARS COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
See below
23. PROJECT OWNER'S INFORMATION
7 -Eleven #18580, Fort Lauderdale, Florida
a. PROJECT OWNER
b. POINT OF CONTACT NAME
C. POINT OF CONTACT TELEPHONE NUMBER
7 -Eleven
John Gomolka, P.G.
954-519-1279
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Program Overview
Be Sure to Notice
· Remedial treatment design, installation,
operation
· Regulatory agency negotiations/coordination
· Innovative bioremediation pilot testing and
design
Shaw and predecessor companies have been a key provider of environmental
services to 7 -Eleven stores having gasoline vending operations for more than a
decade, and the total services volume provided over that period have totaled about
$87 million. 7-Eleven has 3,800 U.S. locations, of which about 2,500 offer
gasoline. Historically, 7-Eleven (and Southland Corporation, a predecessor
company) had employed 20 consultants and has narrowed the number to three
providers, Shaw being one of the three. Until recently, the scope of services related
to assessment and remediation of retail petroleum sites as well as tank replacement programs.
7-Eleven has developed with Shaw's input an Environmental Program Protocol/Operations Manual (POM) which provides for
clear definition of program procedures, authorities and responsibilities of the 7 -Eleven and consultant team members. 7 -Eleven
also has developed an electronic database called SLEDs which allows site-by-site budgeting of tasks and tracking of progress
toward achieving project milestones (e.g., no further action). SLEDs also allows for electronic invoicing and prompt receipt of
payment.
A variety of technologies have been applied to the remediation of hydrocarbon-impacted soils and groundwater, and a pilot scale
treatment system has been installed and data are being gathered at an MtBE-impacted site, In addition, services have been
provided related to real estate and compliance issues.
Due to 7 -Eleven's need to institutionalize compliance procedures spurred by regulatory requirements in the state of California,
Shaw has piloted a comprehensive Environmental Management System (EMS) and compliance audit program in California. A
"green book" which provides guidance to individual store managers has been assembled by Shaw for purposes of identifying
activities that must be conducted and recorded on daily, weekly, monthly, quarterly or annual bases. Shaw conducted training
sessions and participates in follow-up audits to determine the effectiveness of the EMS and the guidance and tools provided to
maintain compliance at the store level. 7 -Eleven plans to roll out the program to its universe of about 2,500 sores that offer
gasoline throughout the U.S.
The states in which we are currently working for 7-Eleven are AL, GA, LA, NM, OK, TN, TX, and FL for assessment and
remediation activities, and CA and NV for EMS/compliance services.
Specific Site Description
Engineering design, installation, and operation of a remedial treatment system targeting cleanup of petroleum hydrocarbon
impact reported in the soil and groundwater at the subject site. Shaw, working for Broward County Environmental Protection
Department under contract with the Florida Department of Environmental Protection, developed the remedial design for an air
sparge/soil vapor extraction system Shaw also performed the installation of the system which included well installation,
trenching, electrical and plumbing activities. Design - $50,000.00; Installation - $350,000; annual operation - $60,000.
1 FIRM NAME
Shaw Environmental, Inc.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
2 FIRM LOCATION Cit
Miami Lakes, FL
ROLE
Prime
STANDARD FORM 330 (6/2004) PAGE F-1
.
.
.
---.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects. If not specified.
Complete one Section F for each proJect.)
20. EXAMPLE PROJECT KEY NUMBER
002
21. TITLE AND LOCATION (City and State)
22. YEARS COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
On going
23. PROJECT OWNER'S INFORMATION
CSX, Jacksonville, FL
a. PROJECT OWNER
b. POINT OF CONTACT NAME
c. POINT OF CONTACT TELEPHONE NUMBER
CSX Transportation/
CSX Intermodal
Greg Oblom
904-366-3889
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
I
Program Overview
Be Sure to Notice
· Industrial hygiene services (asbestos. lead,
mold)
I · Regulatory agency negotiations/coordination
· Permits/environmental compliance
Shaw provides industrial hygiene support to CSX Transportation (CSXT) and CSX
(CSXI) lntermodal throughout their respective systems. A large part of the industrial
hygiene services include maintaining their asbestos, lead based paint and mold
programs within 15 states along the eastern coastline for CSXT and nationally for
CSXI. Tasks associated with this program are broad in scope and includes
inspections, abatements, wet demolitions, in-place management and/or staff
training. More traditional industrial hygiene services have also been provided in order to evaluate worker exposure to materials
such as metals, gasses, chemicals, etc.
Shaw has been retained by CSXI to manage the environmental and compliance requirements for 18 of their Terminals. This
program requires the management of operating permits including; tank registrations, air permits, stormwater permits, SPCC
management, SWPPP management, waste disposal management and coordination, and overall environmental compliance to
meet the demands of established regulations and corporate best management procedures.
Shaw manages the operation of 13 wastewater treatment plants with the CSX territory. The Shaw employees responsible for the
operation of these plants report directly to a CSX manager. Their roles extend beyond the wastewater treatment plant and
include general environmental compliance at their stationed location, as well as, remote locations within their territory. A main
objective of this position is to support a positive environmental atmosphere at the yards and provide a resource for the operating
departments to lean on for environmental needs.
Annual revenue - $500,000.00
1 FIRM NAME
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
2 FIRM LOCATION Clt and State
Jacksonville, Tampa, Gainesville, Miami
Lakes, FL
ROLE
Prime
Shaw Environmental, Inc.
STANDARD FORM 330 (6/2004) PAGE F-1
.
.
.
---....
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not speclned.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
003
21. TITLE AND LOCATION (City and State)
Florida Department of Environmental Protection, Miami
Inti Airport, FL
22. YEARS COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
b. POINT OF CONTACT NAME
c. POINT OF CONTACT TELEPHONE NUMBER
FDEP
Matt McCoy (FDEP)
850-245-8918
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (lnctude scope, size, and cost)
Program Overview
Be Sure to Notice
· Monitoring well installations
· Sampling and analysis of groundwater
· Assessment reports
· Permits/environmental compliance
In accordance with a Florida Department of Environmental Protection (FDEP)
Petroleum Pre-approval Work Order, Shaw has completed the field activities
associated with the free floating product (FFP) gauging, monitoring well purging,
monitoring well installations, and the collection of monitoring well groundwater
samples from 97 monitoring wells at the Concourses B, C, D, and North Terminal
Development (NTD) areas of the Miami International Airport (MIA).
The purpose of this project was to determine the extent of regulated petroleum hydrocarbons present in the groundwater at the
Concourses B, C, and D area of MIA, prior to demolition of the Concourse Band C buildings and the Concourse C Baggage
Shed as part of the NTD construction activities.
The following scope of work was conducted by Shaw at the site as part of the assessment activities:
. Preparation of a Site Specific Health and Safety Plan
. Maintenance of Traffic (MOT) Plan preparation
. Inspection, labeling, and documentation of all accessible Concourses B, C, and D area monitoring wells
. Installation of 64 monitoring wells on airside portion of MIA.
. FFP gauging of all accessible Concourses B, C, and D area monitoring wells
. Purging of all accessible Concourses B, C, and D area monitoring wells
. Groundwater sampling and analyses of all accessible Concourses B, C, and D area monitoring wells that did not contain
FFP
. Preparation of Groundwater Assessment Report
Cost - $300,000
1 FIRM NAME
Shaw Environmental, Inc.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
2 FIRM LOCATION elt
Miami Lakes, FL
ROLE
Prime
STANDARD FORM 330 (6/2004) PAGE F-1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency. or 10 projects, If not specified.
Complete one Section F for each proJect.)
.
.
.
21. TITLE AND LOCATION (City and State)
Florida Department of Transportation, District 2,
Gainesville, FL
20. EXAMPLE PROJECT KEY NUMBER
004
22. YEARS COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
During a road construction project for SR 20 between Gainesville and Hawthorne Be Sure to Notice
FL, the roadway construction contractor did not place or maintain an effective
erosion control system. This resulted in the discharge of sediment laden
stormwater that accumulated in adjacent wetland areas.
Uncontrolled run-off of fill material from this construction site and roadway project
escaped into waterways and wetlands and formed significant deposits, 3 to 16
inches over in 11 areas including wetlands and tributaries to the Lockloosa River in
Alachua County Florida.
This discharge resulted in excessive turbidity, burial of organic wetland soils,
changes to drainage patterns, loss of wetland function, and decreased hydraulic
capacity. These impacts violated State and Federal laws and responsible parties
were subject to civil penalties and fines levied by Florida's Water Management Districts, the US Army Corps of Engineers, and
Florida Department of Environmental Protection.
Typically efforts to remove sediment from wetlands are often hindered by regulatory policies prohibiting further impacts in the
form of root damage, plant loss, soil compaction, and turbidity
caused by heavy excavation equipment. Manual excavation, while
creating less disturbance is often slow, costly, and not entirely
effective, especially in cases where the sediment plume extends
far downstream. In addition, regulators require any damage
resulting from sediment excavation to be repaired, adding
significant cost and effort.
In particularly sensitive wetlands, costs of restoring damage
caused during remedial excavation can overwhelm the costs of
addressing the sediment plume. For the subject project, Shaw was
successful in developing low-impact sediment removal techniques
using vacuum dredging. These techniques are applicable to
streams, tributaries, swales, and wetlands, even in remote areas
or far downstream of the sediment source.
Using a combination of techniques including temporary de-
watering and diversion, hydraulic scouring, and vacuum extraction, Shaw was able to precisely control the depth of sediment
removal to expose the natural substrate, eliminate downstream discharge, avoid damage to root systems from cutting and soil
compaction, and limit impact to surrounding environments.
Using 6-inch aluminum intake tubing, the machine directly reached impact areas from the road shoulder and other locations
where a stable base material was established to a distance of 30 feet. Attachment of flex tubing or 6-inch PVC piping using PVC
couplings and/or flexible rubber Fernco-type adaptors was used to increase the effective length of the intake to a distance of 500
feet.
Shaw's techniques have met with regulatory approval and are a preferred approach. They offer immediate cost reduction benefits
in that manpower needs are greatly reduced and that it lacks a large footprint that would require post-excavation repair, maintains
intact root systems along banks, has little effect on vegetation or soil conditions outside the excavation area, and does not
compromise bank integrity. These attributes are particularly valuable in sensitive environments, such as forested wetlands, where
restoration of impacts caused by traditional excavation techniques can be extremely difficult and costly.
In emergent wetlands and marshes, post-remedial planting was conducted to replace wetland structure and function after
sediment removal. Monitoring of replanting success is ongoing 7 months after installation and all areas exhibit good growth of
planted specimens, recruitment of new plants from surrounding areas and no evidence of disturbance.
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
b. POINT OF CONTACT NAME
c. POINT OF CONTACT TELEPHONE NUMBER
386-961-7582
· Innovative use of common vacuum
equipment - Shaw has pioneered
techniques for remediation of wetlands and
waterways impacted by sediment run-off
from construction sites.
· Time savings for client.
· Solution that was environmentally friendly;
limited impact to natural vegetation and
contours.
~
a
FOOT 2
Jenny Sargent
STANDARD FORM 330 (6/2004) PAGE F-1
.
.
.
This innovative approach using industry available vacuum equipment
quickly and effectively recovered sediment released to a wetland.
Attributes of this approach include reduced schedule and cost,
minimal disruption to an active wetland during sediment recovery,
rapid wetland restoration and approval and support of the 8t. Johns
River Water Management District.
PVC pipe and flexible tubing were used to reach sand deposits along 350
feet of streambed without compromising bank integrity.
a.
1 FIRM NAME
Shaw Environmental, Inc.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
2 FIRM LOCATION eit
Miami Lakes, FL
ROLE
Prime
STANDARD FORM 330 (6/2004) PAGE F-2
.
.
.
- -
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, "not specIfied.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
005
21. TITLE AND LOCATION (City and State)
22. YEARS COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami-Dade County Department of Solid Waste, Miami, FL
2000-present
23. PROJECT OWNER'S INFORMATION
2000
a. PROJECT OWNER
b. POINT OF CONTACT NAME
c. POINT OF CONTACT TELEPHONE NUMBER
Miami-Dade County
Steve Christensen
305-594-1614
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Program Overview
Shaw has a contract for the operation and maintenance of two sequential batch reactor type wastewater treatment plants for the
Department of Solid Waste Management. The system uses a modified sequencing batch reactor (SBR) process technology.
The purpose of the SBR is to treat leachate recovered from the landfill and reduce contaminant concentrations to below permit
and wastewater treatment facility influent standards. The SBR was designed to treat a maximum concentration of 764 mg/I of
ammonia at a permitted flow of 320,000 gallons per day.
Shaw's contract is valued at $4,512,247.00 for the 5-year term. The service requirements include the operation and maintenance
of extraction wells and injection wells associated with groundwater. Services also include monitoring and maintenance of the
stormwater system structure, such as the injection wells, which are intimately related to the groundwater.
Shaw provides all employees, vehicles, material, administrative design, and operational services required to staff and operate the
facilities as required by the operating permits. Shaw's facility operator holds a Class "A" certification and license for wastewater
treatment plant operators as listed in Chapter 62.602 of the Florida Administrative Code.
a.
1 FIRM NAME
Shaw Environmental, Inc.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
2 FIRM LOCATION Clf
Miami Lakes, FL
ROLE
Prime
STANDARD FORM 330 (6/2004) PAGE F-1
1 FIRM NAME
. a. Shaw Environmental, Inc.
.
.
_."_..--- '"
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 proJects, If not specified.
Complete one Section F for each proJect.)
20. EXAMPLE PROJECT KEY NUMBER
006
21. TITLE AND LOCATION (City and State)
Environmental Services for South Florida Water
Management District, West Palm Beach, FL
22. YEARS COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2005 to Present
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
South Florida Water
Management District
3301 Gun Club Road
West Palm Beach, FL 33416
b. POINT OF CONTACT NAME
c. POINT OF CONTACT TELEPHONE NUMBER
561-625-5157
Bob Kukleski
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
I
Shaw serves SFWMD under an Indefinite Quantity Contract (IQC) to perform
Environmental Site Assessments and Related Environmental Services of District
Lands. This contract covers the 16 counties located within the South Florida Water
Management District of central and south Florida.
The primary work involved is the completion of Assessment of Real Property, Phase
II Site Assessments, and Ecological Risk Assessments. Randy Youngman acts as
Contract Manager and directs his team in performing feasibility studies, prepared
remedial cost estimates, developed and executed ecological risk assessments,
sampled for asbestos and lead-based paints, and AST/UST management.
Assessment of Real Property
Be Sure to Notice
· Large site experience
· State client/regulatory familiarity
· Phase I and II ESAs
· Innovative assessment techniques
· Familiarity in working with Regulatory
Agencies
· Design and use of ERAs
· Agency coordination, FDEP, SFWMD,
USFWS, etc.
An important and common aspect of this contract was working within very stringent
timeframes for determining if a potential property purchase should be completed
based upon environmental conditions at the property. To provide the summary reports to the client quickly, Mr. Youngman, as
Contract Manager, developed a management approach that blended advanced planning, adaptability, responsiveness and
experience in a highly effective manner.
Phase I and/or Phase II Environmental Site Assessments ranged from an 80-acre vegetable farm to a ranch/former farmland
consisting of more than 20,000 acres. Shaw personnel also completed a sediment assessment on the western shore of Lake
Okeechobee. A majority of our work with the SFWMD has been completed as part of the Comprehensive Everglades Restoration
Project (CERP).
The range of tasks associated with these projects included county and local and regulatory records reviews, aerial photography
reviews, lead paint surveys, asbestos surveys, building inspections, UST management, removal and remediation, site interviews,
natural resource surveys, identification of potential environmental conditions, recommendations, and report production. Upon
completion of the Phase I Real Estate Assessment, recommendations are made to the SFWMD to determine the further assessment
required at the property. If required, a Phase II Assessment is completed.
The Phase II Assessments included soil, groundwater, sediment and surface water sampling and analysis, lead-based paint
sampling, asbestos sampling, data validation, GPS surveying of sample locations, GIS mapping, data management, and reporting.
Randy Youngman completed several Ecological Risk Assessment (ERA) projects at former agricultural properties for the
SFWMD. The ERAs were completed in conjunction with and approved by the U.S. Fish and Wildlife Service.
The scope of the ERA included comparison of analytical results to the appropriate state and federal criteria, dose and response
research, hazard quotient calculation and the modeling of the response from the appropriate ecological receptor.
Approvals of these ERAs have allowed the SFWMD to utilize the properties for their proposal land use as part of the CERP
(surface water treatment areas or surface water storage reservoirs).
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
2 FIRM LOCATION Cit and State
Clermont, Miami Lakes, FL
ROLE
Prime
STANDARD FORM 330 (6/2004) PAGE F-1
----~.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects. If not specified.
Complete one SectIOn F for each project.)
.
1. TITLE AND LOCATION (City and State)
Brownfields Site at Northeast Plaza Shopping Center,
Sarasota, FL
20. EXAMPLE PROJECT KEY NUMBER
007
22. YEARS COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
October 2000 -
Ongoing
a. PROJECT OWNER
b. POINT OF CONTACT NAME
23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
LandBank Properties, L.L.C.
9201 East Dry Creek Road Tim Roberts 303-741-7307
Centennial, CO 80112
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Existing Use: This 121,000 square foot shopping center is traditionally fully leased
and produces a strong net operating income. Grocery store anchored retail strip
center with a total of 123,355 SF of leasable building area on 13 acres. NOI of
$761,000.
Challenge: A portion of the soils and groundwater on the site have been
contaminated by dry cleaning chemical releases, tetrachloroethene (PCE) and
associated daughter products. Minimal off-site groundwater impacts have been
identified on adjacent city-owned lands although they do not pose a threat to the
environment or human health.
I Be Sure to Notice
· Typical yet complex urban setting
· Familiarity in working with Regulatory
Agencies (FDEP & Sarosata County)
I · Advanced cac understanding
· Comigled plumes
· Services provided to an active retail
center
· Innovative remedial action designs
Solution: An aggressive remedial approach of potassium permanganate injection
and soil vapor extraction/air sparging was instituted under a Voluntary Cleanup
Agreement with the Florida Department of Environmental Protection (FDEP).
Site History: The subject property is situated on the northeast corner of the intersection of Lockwood Ridge Road and 17th
Street in Sarasota, Sarasota County, Florida. Three free-standing, one-story buildings totaling approximately 121,335 net
rentable square feet occupy the subject site. Building #1 was originally constructed in 1964 with additions in 1978, 1981 and
1991. Building #1 contains approximately 104,405 square feet divided into 14 retail units. Building #2 was originally constructed in
1964 with one addition in 1981. Building #2 contains approximately 16,530 square feet divided into four retail units. Building #3
was constructed in 1985 and contains one retail unit of 400 square feet. The masonry and steel structures are all built on cast-in-
place, reinforced, concrete slabs-on-grade over pier and spread footing foundations. Buildings 1 and 2 contain flat built up and/or
membrane roofs while building 3 features asphalt-shingled hip roofs. Approximately 45,500 square feet of the site is landscaped
and the remaining 310,305 square feet is parking and driveways. A Mobil gasoline station is situated on the northeast corner of
Lockwood Ridge Road and 17th Street, southwest of the subject property on land not included with this transaction. The Century
Bank facility was sold and is considered a free-standing structure off-site. The site is supplied municipal water and sewer.
.
The subject property was undeveloped land until 1964 when the shopping center development was initiated. In 1964 the first
construction included 42,200 square feet for Building 1 and 3,330 square feet for Building 2. In 1978, a 21,100 square foot
addition was completed for Building 1. In 1981,37,215 square feet were added to Building 1 and 13,200 square feet were added
to Building 2. Building 3 was constructed in 1985 and contains
400 square feet. The last addition to the property occurred in
1991 when a 4,000 square foot addition was completed on
Building 1. Various national chain and local tenants have
occupied space at the site.
The subject property is currently utilized as a strip-mall
shopping center with various national chain and local tenants.
The national tenants include Winn-Dixie, Blockbuster, Ace
Hardware, AutoZone, Subway, Dollar General, and Big Lots. A
combination dry cleaner and coin-operated laundry operation
is situated on the north end of Building 2. The current tenant
has been in operation since 2002; however, the space has
been utilized by various other parties with the same type of
operations since the beginning of the development.
Environmental Clean Up: The total remediation cost is
estimated at $1 ,200,000, and capped through a fixed price
contract with SEI. Approximately $890,000 has been incurred
to date. The adjoining Mobil service station is currently undergoing active remediation within a State mandated program for a
petroleum spill that has migrated onto the subject property.
.
STANDARD FORM 330 (6/2004) PAGE F-1
.
.
.
The source of identified subsurface impacts at the site is the historic use of one of the rental units as a dry cleaner and coin-
operated laundry facility (3343 NE 17th Street). The noted address has housed dry cleaning operations and coin laundry services
since the development of the property with the current tenant in operation since 2002. The facility has a new closed-loop dry
cleaning machine installed in 1997. Tetrachloroethene (peE) is the only reported dry cleaning solvent used at the site.
The most recent Title V General Permit facility inspection (7/22/02) conducted by Sarasota County Environmental Services found
the facility to be in compliance with the requirements of FDEP Rule 62-213.300, Florida Administrative Code for the period of
August 3,2001 to July 22,2002. A Hazardous Waste Compliance Assistance Visit was conducted by the Florida Department of
Environmental Protection Division of Waste Management on March 9, 2000. The purpose of the visit was to assess the level of
compliance with federal and state regulations governing the management of hazardous waste. Three areas of concern were
identified during the visit. The first issue pertained to the secondary containment requirements for all peE and peE-containing
wastes. The facility was notified that containment should be capable of holding up to 110% of the volume of the largest container
stored within it.
The second issue related to waste manifesting to verify that wastes were received and accepted at an approved disposal facility.
The third issue pointed out that separator water from the dry cleaning machine must either be disposed of as a hazardous waste
or properly treated through an approved carbon filtration system prior to disposal through misting or evaporating. A follow-up
inspection was scheduled within 120 days of March 9, 2000. Documentation pertaining to the re-inspection was not available at
the state office. Northeast Plaza Venture I, LLC notified the new dry cleaner tenant of their requirement to comply with all
stipulations of the lease pertaining to compliance with environmental laws and insurance.
A Mobil gasoline station is situated adjacent to the site in a small parcel cut out of the southwest corner of the subject property.
The Mobil station is undergoing active remediation for a petroleum hydrocarbon release from an unleaded gasoline product
delivery line discovered March 3,1987. The release migrated onto the subject property and remedial action is being performed in
response to the release. A groundwater pump and treat system along with soil vapor extraction has been implemented.
Remediation is currently proceeding under the petroleum reimbursement program for the state. Groundwater monitoring is
expected to continue until the state issues a "no further action" letter. Liability for the cleanup of the petroleum release will remain
with Mobil or their successors.
(1) FIRM NAME
a. Shaw Environmental, Inc.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(2) FIRM LOCATION rCitv and State)
Clermont, Miami Lakes FL
ROLE
Prime
STANDARD FORM 330 (6/2004) PAGE F-2
---' --.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many prOjects as requested by the agency, or 10 projects, If not specified.
Complete one Section F for each project.)
r---.
.
.
.
1. TITLE AND LOCATION (City and State)
Site Assessment Pear Park Property, Lake County, Florida
20. EXAMPLE PROJECT KEY NUMBER
008
22. YEARS COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Ongoing
23. PROJECT OWNER'S INFORMATION
Lake County Environmental
Services
13130 County Landfill Rd.
P.O. Box 7800
Tavares, FL 32778-7800
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
I
I
I
a. PROJECT OWNER
b. POINT OF CONTACT NAME
c. POINT OF CONTACT TELEPHONE NUMBER
352-343-3776
In collaboration with Lake County, Shaw designed a site assessment plan to
investigate the impacts from arsenic at site being developed for planned
recreational property. Shaw was initially tasked with the oversight
(shadowing/auditing) of another consultant representing the former property owner
in their completion of site investigation tasks designed by Shaw. Shaw was later
assigned the contract for the design and implementation of a source removal and
natural attenuation/monitoring only plan. The scope of work for this investigation
included:
Be Sure to Notice
· Phase I and II ESAs Audit
· Familiarity in working with Regulatory
Agencies
· Source removal design and execution
I · Florida County service provider
. Site Survey
. Subsurface Investigation
. Existing Well Sample Collection and Analysis
. Soil Sampling
. Groundwater Assessment
. Quarterly Monitoring
. Source Removal
As one of the objectives was to identify the presences of a
former cattle dip vat a ground penetrating radar (GPR) survey
was performed. This survey was restricted to the west by the
property boundary and to the north by surface water in the
vicinity of the Palatlakaha River. The GPR investigation identified
four subsurface anomalies that were further investigated through
the excavation of test pits.
A pre-existing on-site well was used as part of this investigation '. ~"
for groundwater sample collection purposes. A groundwater sample was collected from the well for analysis of organochlorine
pesticides (OCPs) and arsenic. The results of this analysis indicated that OCPs and arsenic are not present in the groundwater
above the test method detection limits or the groundwater cleanup target levels (GCTLs) established in Chapter 62-777, of the
Florida Administrative Code (FAC).
In addition, four shallow monitoring wells were constructed in the area of the suspect cattle dip operations. These wells were
surveyed and sampled. The water table elevation was determined, documenting a groundwater flow direction toward the
northwest. Groundwater samples collected from these newly installed wells were analyzed for arsenic, 1 ,2-Dibromoethane (EDB)
and OCPs. Again, none of the analyzed compounds were detected above the test method detection limits or the GCTLs.
Shaw returned to the site to collect soil samples to vertically delineate total arsenic. Four sample boring locations were selected.
Soil samples from these borings were collected at various vertical depths and analyzed for total arsenic. The results of these
analysis indicated that total arsenic concentration is in excess of the State's current Soil Cleanup Target Levels (SCTLs), as
established in FAC 62-777, of 0.8 milligrams per kilogram (mg/kg) (residential) and 3.7 mg/kg (industrial) in two of the four
borings at all depths. The residential standard was exceeded in all locations and depths in each boring with the exception to one
sample (1 to 6 feet below land surface) and another at all depths. Applying the proposed new SCTLs of 2.1 mg/kg residential and
12 mg/kg industrial, one boring location exceeded the residential standard at 0.5-, 2- and 5-foot depths and the industrial
standard at 1- and 2-foot depths. In another boring the residential standard was exceeded at all depths while the industrial
standard was over the SCTL at 0.5- and 1-foot depths.
Emilio Burma
STANDARD FORM 330 (6/2004) PAGE F-1
.
.
.
I
Lu
Based on the results of this investigation, total arsenic in soil was the only matrix and chemical of concern for the study area.
Applying the established SCTLs for arsenic the area of potential impact was defined both vertically and horizontally allowing
source removal approach to be designed. This design was presented to and approved by the FDEP. Approximately 1,000 cubic
yard of arsenic impacted soil were recovered and transported off site for disposal. A series of conformation samples were
collected from the sides and base of the excavation areas to document the complete removal of the impacted soils. A natural
attenuation/monitoring only (NA/MO) plan was developed and approved by the FDEP providing for the quarterly sampling of
monitoring wells for 1 year.
Five permanent monitoring wells were constructed in former impact area and sampled/analyzed for total arsenic. Elements of this
project that benefited our client include:
. Rapid negotiation and approval of regulatory document from the FDEP
. Innovative use of 0.006 inch slot well screen to reduce impacUfalse readings as a result of groundwater sample turbidity
. Quick implementation of the NA/MO allowing the site investigation groundwater sample results to be used as the first quarterly
monitoring event
. Reduced project costs and schedule
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION rCitv and State) ROLE
a. Shaw Environmental, Inc. Clermont, Tampa, FL Prime
STANDARD FORM 330 (6/2004) PAGE F-2
--
-^ -
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many prOjects as requested by the agency. or 10 prOjects, If not specIfied.
Complete one SectIon F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
009
21. TITLE AND LOCATION (City and State)
Phase I, Phase II, Orange County Risk Management
Division, Ocoee, Orange County, Florida
22. YEARS COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
01/04 - 04/04
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
b. POINT OF CONTACT NAME
c. POINT OF CONTACT TELEPHONE NUMBER
Orange County
Tim Tyndall
(321) 239-2382
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
.
I Be Sure to Notice
· Large site experience
· Phase I and II ESA
· Quick source area identification
· Familiarity in working with a Florida
County
· Regulatory and analytical test method
understanding
Shaw completed Phase I and Phase II Environmental Site Assessment (ESA)
activities on a 16-acre property located in Ocoee, Orange County, Florida on behalf
of the Orange County Risk Management Division. The subject property was
approximately 16.6 acres in size and consisted of one unoccupied 1,744 square foot
residential home, six storage sheds, and three horse stables. The remainder of the
property consisted of undeveloped pasture with a pond of unknown size located in
the middle of the property. The future land use of the subject property was identified
as low-density residential, which is defined as up to four units to the acre.
During Shaw's site reconnaissance and file review revealed that a portion of the
property was cultivated with citrus for over 50 years. As a result, Shaw
recommended further investigation of residual agrochemicals in the soil. Due to the
age of the residential structure, it was possible that asbestos containing materials and lead-based paints were used during its
construction. Shaw recommended that prior to removal of the structure from the subject property, an asbestos and lead-based
paint survey be completed.
During Shaw's Phase I ESA investigation, it was indicated that five groundwater monitoring wells have been installed on the
subject property due to a contaminated groundwater plume originating from the eastern adjacent property. The last four sampling
events of the monitoring wells located on the subject property have not detected any contaminants in the groundwater. Shaw
recommended continued quarterly sampling of these wells.
As part of Phase II ESA activities, Shaw collected surface soil samples from five locations on the east side of the subject
property, which was historically utilized for citrus agriculture. The soil samples collected from these five locations were combined
to form one composite soil sample that was submitted for laboratory analysis of organochlorine pesticides by Environmental
Protection Agency (EPA) Method SW8081, organophosphorus pesticides by EPA Method SW8141, chlorinated herbicides by
EPA Method SW8151, eight Resource Conservation and Recovery Act (8-RCRA) metals plus copper and zinc by EPA Method
SW6010, and total organic carbon (TOC) by EPA Method SW9060. In addition, individual soil samples were collected from the
five locations and held at the laboratory pending analytical results of the composite soil sample. The five individual soil samples
were to be analyzed only if an analyte detected in the composite soil sample exceeded FDEP Chapter 62-777, FAC, Residential
Soil Cleanup Target Level screening criteria.
.
1 FIRM NAME
Shaw Environmental, Inc.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
2 FIRM LOCATION elt and State
Clermont, Tampa, FL
ROLE
Prime
STANDARD FORM 330 (6/2004) PAGE F-1
-,
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many prOjects as requested by the agency, or 10 projects, If not specified.
Complete one SectIOn F for each proJect.)
-
20. EXAMPLE PROJECT KEY NUMBER
010
21. TITLE AND LOCATION (City and State)
Site AssessmenURemedial Alternative Evaluation, Tampa,
FL
22. YEARS COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Ongoing
23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
a. PROJECT OWNER
b. POINT OF CONTACT NAME
WRB Enterprises, Inc
Carlton Fields, P.A.
Corporate Center Three at
International Pkwy.
4221 West Boy Scott Blvd.
Tam a, Florida 33607-5736
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (tnctude scope, size, and cost)
Laurel Lockett, Esq
813-229-4139
Environmental Issues: As part of ongoing activities at this vacant facility, Shaw
has performed several tasks including Source Removal, Supplemental Assessment
Plan and Reporting and QAPP; soil, groundwater, sediment, and surface water
sampling and analyses; surveying; and transportation and disposal of contaminated soils and investigation derived wastes.
Additionally, Shaw has identified an offsite source of contamination with considerable data supporting this position whose
property owner is sharing in the ongoing SA and remedial measures. During this project, Shaw has provided expert opinion in
meetings with the current property owner, attorneys, and local/state regulatory authorities and public regarding the progress to
date. Shaw has worked successfully with the owner and regulatory officials to establish the Brownfield Site Rehabilitation
Agreement (BSRA) for this site - the first in Hillsborough County and receive $100,000 grant monies to complete the SA.
Location: Industrial area on the east side of Tampa. The 8.13-acre site is position
on a dead end road off of US 301, north of Highway 60 in Tampa, Florida.
Site History: The site is the former location of a Landia Chemical facility which
process, packaged and distributed agricultural chemicals. In the late 80's, following
the acquisition of the property by WRB Enterprises, drums and bags containing
pesticide products were discovered. Following discovery WRB Enterprises has
proactively recovered identified pesticide sources and continued site assessment
and remedial measures in conjunction with the approved programs of the FDEP
and the EPA.
.
Be Sure to Notice
· Developed an EPA Approved QAPP
· Assisted with the development of the BSRA
· Successful application and receipt of EPA
grant monies
· Shaw maintained FDEP/EPA Approved
Contractor Status
· Designed and performed innovative
remedial measures
· Familiarity in working with County
Brownfield Programs
The assessment and remedial technologies have involved Organochlorine Pesticide Compounds. Inherent to these compounds
is a very low detection and cleanup standards imposed by the FDEP. Shaw has successful designed an assessment approach to
accurate evaluate the OCP impact. Part of the approach was a though evaluation of the aquifer characteristic in an effort to
achieved the FDEP "Low Yield Criteria" and thereby raise the applicable cleanup target level which will result in potential Natural
Attenuation/No Further Action status or reduced remediation time and costs.
Strategy: WRB Enterprise has designed a property reuse plan consisting of the removal of the existing warehouse building,
performing a limited Source Removal and the construction of an industrial park for truck access/material distribution. It is
anticipated that EPA available remediation grant monies will be available as well as remediation mitigation credits to reduce
remediation (Source Removal) costs.
The design takes into account the environmental concerns with the application of engineering controls to prevent the
exacerbation of residual OCP compounds, allowing the maximum safe-guard to the community with lower overall development
costs.
a.
1 FIRM NAME
Shaw Environmental, Inc.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
2 FIRM LOCATION Cit and State
Tampa, Clermont, FL
ROLE
Prime
.
STANDARD FORM 330 (6/2004) PAGE F-1
.
.
.
--
III
8-u;
-.:s-.:s
C1> e
__ cu
cu III
E ::I
._ 0
-- ..c:
111__
We
:::
C1>
:c
... E .~
oc;: ~g
:;..cCi)t-
o:E~f'-
:!: ~ .!!! ffl
a.i
--
e
C1> C1>
u-
... C1>
~a.
E
.0
-.:sU
C1>
e
o
..c:
e..
""
C1>
E
cu
Z
-~
C1>
C>
cu
e
cu
~::E
C1>_
:E.~
00
C1>Q:
:C-.:s
oU; c
e cu
o III
Colli
III C1>
C1> ...
a:::-.:s
_-.:s
>0<1:
U-.:s
~ c '-
c>CUC1>
<l:C1>.Q
E E
cu ::I
uZZ
~
:c
.in
e
o
Co
III
C1>
a:::
III
-E
u:
'0
~
~
cu
Z
.ci
,~
;;0
.~
e
.~
fti
U
o
-J
""
C1>
E
cu
Z
-
U
C1>
'0
Q:
e~
~.e
we..
o
o
0)
00
ffl
>R
o
o
I'-
N
o
o
o
o
2>
o
N
eo
<(
o
<(
o
2
f-
~N
"5 N
~~
co eo
20")
- I'-
-oLri
~(O
Dc
~~
._ co
> C
..c C
~~
2CG
ui::2:
0>.
;75~
:::>~
en
Q)
C,)
.:;
Q)
Cf)
ro
C
Q)
E
C
2
.:;
Co
wa:
~--
a:~
f---
Ia:
Q)
>
a:
.2 ~
..c ~
0=
...::2:
S~
en-
Q) .:;
.~ u.gJ
Ci3 c- Co
Cf)O-o
W:!Zi S
~.2: 0
<(0(lJ
o
lO
I'-
"",-
ffl
o
o
lO
ffl
o
o
o
lO-
ffl
o
o
lO
ffl
>R
~
0)
>R
o
lO
0)
ch
CL
Cf)
:::>
o
I'-
0")
00-
ffl
o
o
o
lO
ffl
o
I'-
0")
00-
ffl
o
o
o
lO-
ffl
>R
~
N
~
lO
0)
o
o
0")
CD eo
en 0 O)lO
~ 0 LO~
1'-':; I'- 0 8 '"?
~<v NO ~~
~Cf) ~~ ~lO_
coo CJ)~ 5
50")0. 000 ""'2
::>L()o. eo >-...
_~~ ~C"') ~Q)
~:~ ;~ ~-~
~ 0 __ - -L.. os; >.
(i) en .~ Z S 0 0 en ro
.~ Q;.~ - (f) m- gj ~ E
&~C~~LLX~_~
Q)-~Q) E ~,g <( 8:i u 0
-0 Q) (J cco'SO:::
is ffi ~ 2 Z 5l lO .~ N
N~~tfLD.ill[?;ON
~ ~ .~ E t- ro N ~ 9
ro OC> 2:.~ ~ Q.. r-- "S; 0
U5 8 ~ 0 ...!, i: ~ -s cO
IDc0 -'0, 0>'- ocr>
.;x:: I ro Z cr> 'C Q3 ...-..J ~
.s~~Eth5:u; -"I
Cf)~CL~~LL.3~~
~Mu:i~~<(C<(~
:::>'::;..:::>2~~&~e.
en
Q)
C,)
.:;
Q)
Cf)
0>
C
.~
Q)
C
'c;,
C
W
en
Q)
C,)
s
Q)
Cf)
Q)
C,)
C
.~
0..
E
o
o
ro
C
Q)
E
C
2
.:;
C
W
C
Q)
:5
o 0
o 2
Q) Q)-
C,) C,)
'5 ":;:
Q; CD
Cf) Cf)
en~2
~ en
~~&u
ujzuj~
:::>::2::::>0
en
Q)
C,)
s
Q)
Cf)
0>
C
.~
Q)
.S
0>
C
!:!:!
ro
C
Q)
E
C
2
s
C
W
en
Q)
C,)
.:;
Q)
Cf)
2
C
Q)
E
C
2
s
C
W
W
<i:
I
o
(lJ-
LL
<(
C
o
en
.ill
co
q.
:c
0>
~
- Q)
~ >
C,).-
.;:: a:
en 0
o:.c
Q)O
;=:-0
> C
.~ co
::J <J)
o Q)
-..l ".,
w.sc
o co'~
<( Q)'-
en "-.~
:::>00
o
N
eo
N-
ffl
o
o
"'"
N-
ffl
o
N
eo
N
ffl
o
o
o
lO-
ffl
~
o
~
>R
o
lO
C
o
en
Q)
o~
I'- ..c
""'0
0"):5
::2:N ...
2~~
<li:g c-
5- lO .Q
Q) ?=.~
5-~c303'
::JC "'"
:Q~Eo
<((JQ)~
~-::2: 'S 9 ~
.S,2 (5 0 0) eo
.~~U)_~6
00 >.eo N
Q)~iU""'~
=:J.~ NC"")
rrN 2 eo "'"
...0Q)200
<1.>C>..c-._
5-0 .::: ~ 5
E ~ ~ ~ .~
<(~a3mo
-"'" E ~::2:
~<(tQl;Q)
<( 0 ~ N .S
Cf)<(Q)0~
:::>80Cf)W
enO
Q) ::::::
.S,20
> -
... en
Q) Q)
Cf)C,)
+-' '5
o W
~Cf)
::J-
Cf)2
wfij
<i: E
-- C
~ 2
a: .-
f- E;
IW
>.E
> ~
COo>
20
-00::
c~
co C
E Q)
~ ~
0> 0>
o co
ct ffi
c::2:
.QQ)
Coo
Q) co
i!)~
ct~
C 0
.Q -0
~
~ N
o co
CLI
U
.;::
en
o
Q)
::J
rr
Q)
::J
rr
::J
.a
<(
W
o
<(
Cf)
:::>
C
o
'en
.:;
>.0
> C
co ...
2~
u:i:5
.0
:::>Cf)
o
o
eo_
I'-
ffl
o
o
eo
1'--
ffl
>R
o
0)
CD Ln
N ~
o eo
00 000)
6 9:;:
2> ('f")~
<:> 9c.O
~ ~(V)
N NlO
~ ~~6
"'" ""'N
!:oS lO !:oS en
xlOx2
f-~f-c
s:-~ s:-c?5
<(~<(~
Cf)~ 00-1
"iSN"iSQ)
eroe~
(lJ2:(lJa:
w-U5w~
W "- W"i::
o~oco
LLQ)LLQ)
<(0<((lJ
en
Q)
C,)
.:;
Q)
Cf)
W
<i:
Q)
..c
6
-0
C
co
Q)
=
i=
~
i=
Q)
-0
.~
"0
15
~
W
<i:
CL
0")
W
W
o
LL
<(
o
o
o
0-
lO
ffl
o
o
o
c::i
lO
ffl
>R
o
~
en
Q)
C,)
.:;
Q)
Cf)
W
<i:
Q)
..c
6
-0
C
co
Q)
=
i=
Q)
=
i=
Q)
"0
.~
"0
15
~
W
<i:
CL
"'"
W
W
o
LL
<(
o
o
0)
c-J
~
ffl
~
ro
0..
m
-'"
'-'
o
en
o
o
o
lO-
ffl
o
o
0)
N-
~
ffl
o
o
o
lO
ffl
>R
00
0)
>R
o
"'"
M
0")
o
o
o
d;
0)
2>
lO
eo
"'"
0")
!:oS
~
}
5.
Ln
o
o
0)
o
"
R
"
~
o
"'"
N
eo
..-
"'"
:>. "'" !:oS
5i8xoo
cor--:f-_8
EO(lJeo
o 0") LL .
..c0")<(~
COlOenlO
::;;::O~ci
0""'_ g ~
cri ~ Ci5 N_
LLO ".,
<( CL <(- ro
Q)Q)a:U5
~C~Q)
COLL::J
i=::2:<(Cf)
"~
'J
"
l'
"
'J
-;;
..,
"
"g
3
E
~
0>
o
0::
en
Q)
C,)
.:;
Q)
Cf)
2
C
Q)
E
c
2
.:;
c
W
W
<i:
"
0;
..,
""3
"
3
~
'S
'3
"
Q)
C,)
o
l.L
...
<(
Q)
:5
...
.2
en
Q)
C,)
s
Q)
Cf)
W
<i:
~
o
(lJ
LL
<(
Q)
".,
C
i=
0:5
Q)ro
:a~
~ro
.5 c
Q)g
2 ~
~a
... C,)
<(0
'"
'"
N
Ec
oC":
u.C
C
1:>"
.g~
"c
roLL
-r---
enc
.
.
.
CITY OF SUNNY ISLES BEACH
QUALIFICATIONS FOR PROFESSIONAL GENERAL ENGINEERING CONSULTANT
Appendix A
Required Signed Forms
I SHAW ENVIRONMENTAL, INC.
06C122006T
State of Florida
Department of State
I certify from the records of this office that SHA W
ENVIRONMENT AL, INC. is a corporation organized under the laws of
Louisiana, authorized to transact business in the State of Florida,
qualified on June 7, 2002.
The document number of this corporation is F02000002878.
I further certify that said corporation has paid all fees due this office
through December 31, 2007, that its most recent annual report was filed
on March 13,2007, and its status is active.
I further certify that said corporation has not filed a Certificate of
Withdrawal.
Given under my hand and the Great Seal of
Florida, at Tallahassee, the Capital, this the
Twenty Ninth day of May, 2007
~u
Secretary of State
Authentication 10: 100 I 03444391-052907-F02000002878
To authcnticate this ccrtiticate,visit the following site, enter this
10, and then follow the instructions displayed.
www.sunbiz.org/auth.html
en
0
I
I [Xl
I W
""'u..
~ I
. MOO
enN
"z
[tio
ali::
~<t
:J[:t:
l.rt Zii:
u CO Z)(
c:: >'0 OW
-COM
rn~M I-
eQ)....! <t
Q)ULL N
E.... - Ck::
c::~(J)
o w 0 ~
....E~
.- <(
E;O....J ..J
WO_ >
3~~ al
c
COM<( W
.!::'<T~ a:
(J)..- :5
w 0
a: w
UJ a:
-1 ::c en
L ::c <l:
U ~
~ ..J
UJ D-
o en
i5
.
C"")
r-,..
o
........
o
o
a,
a
f"-
a
d
z
t-
O
::)
<(
.
.
.
.
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC
OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted to City of Sunny Isles Beach
by Curtis Lee, P.G., Florida District Manager
for Shaw Environmental, Inc.
whose business address is 14350 Commerce Way, Miami Lakes, FL 33016
and (if applicable) its Federal Employer Identification Number (FEIN) is 77-058-9932
(IF the entity had no FEIN. include the Social Security Number of the individual signing this sworn statement:
2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes,
means a violation of any state or federal law by a person with respect to and directly related to the
transaction of business with any public entity or with an agency or political subdivision of any
other state or of the United States, including, but not limited to, any bid or contract for goods or
services to be provided to any public entity or an agency or political subdivision of any other state
or of the United States and involving antitlUst, fraud, theft, bribery, collusion, racketeering,
conspiracy, or material misrepresentation.
3. I understand that "convicted" or "conviction" as defined in Paragraph 287. 1 33(1)(b), Florida
Statutes means a finding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial COUlt of record relating to charges brought by
indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry of a
plea of guilty or nolo contenders.
4. [understand that an "affiliate" as defined in Paragraph 287.133(1)(a), Florida Statutes, means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the management of the entity
and who has been convicted of a public entity come. The tenTI "affiliate" includes those
officers, directors, executives, partners, shareholders, employees, members, and agents who are
active in the management of an affiliate. The ownership by one person of shares constituting a
controlling interest in another person, or a pooling of equipment or income among persons
when not for fair market value under an ann's length agreement, shall be a prima facie case that
one person controls another person. A person who knowingly enters into a joint venture with a
person who has been convicted of a public entity crime in Florida during the preceding 36
months shall be considered an affiliate.
5. I understand that a "person" as defined in Paragraph 287.133(1)( e), Florida Statutes, means any
natural person or entity organized under the laws of any state or of the United States with the
legal power to enter into a binding contract and which bids or applies to bid on contracts for the
provision of goods or services let by a public entity, or which otherwise transacts or applies to
transact business with a public entity. The term "person" includes those officers, directors,
executives, partners, shareholders, employees, members, and agents who are active in
management of any entity.
.
.
.
6. Based on information and belief, the statement which I have marked below is true in a relation to
the entity submitting this swom statement. (Please indicate which one (\) of the following three
(3) statements is applicable.)
L (1) Neither the entity submitting this swom statement, nor any of its officers, directors,
executives, pal1ners, shareholders, employees, members, or agents who are active in the management
of the entity, or any affiliate of the entity has been charged with and convicted of a public entity
crime within the past 36 months.
_(2) The entity submitting this swom statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the management
of the entity, or any affiliate of the entity has been charged with and convicted of a public entity
crime within the past 36 months.
_(3) The entity submitting this swom statement, or one or more of its officers, directors,
executives, pal1ners, shareholders, employees, members, or agents who are active in the management
of the entity, or agents who are active in management of the entity, or any affiliate of the entity has
been charged with and convicted of a public entity crime within the past 36 months. However, there
has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of
Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the
public interest to place the entity submitting this swom statement on the convicted vendor list.
(Attached is a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORNI TO THE CONTRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH I (ONE) ABOVE IS FOR
THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31
OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE
CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND
THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A
CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017,
FLORIDK"\STATUTES FOR THE CATEGORY TWO OF ANY CHANGE IN THE
INF MA -mON C T AINED IN THIS FORM.
Curtis Lee, P.G., Florida District Manager
(Printed or Typed Legal Name of Affiant)
State of FL County of O~I1~~
Swom to and subscribed before me this 0> \ day of A )0.. v~ 1-
, 2007 by
Notary Seal:
~~Y'(f~
.,.lM~
~A.. ~
'<Ofl\.\ii
(407) 398'{)153
GAYLE M COSTANZA
MY COMMISSION # DD534628
EXPIRES: Mar. 30, 2010
Personally Known:
ROOda Notary Servica.com
Identitication Produced
.
NON-COLLUSIVE AFFIDA VIT
State of Florida
County of lake
Curtis lee, P.G., Florida District Manager
and says that:
being first duly sworn, deposes
(1) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully infonned respecting the preparation and contents of the attached Bid and
of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
.
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded, conspired,
connived or agreed, directly or indirectly, with any other Bidder, finn, or person to submit a
collusive or sham Bid in connection with the Work for which the attached Bid has been
submitted; or to refrain from bidding in connection with such Work; or have in any manner,
directly or indirectly, sought by a!:,'Teement or collusion, or communication, or conference with
any Bidder, finn, or person to fix the price or prices in the attached Bid or of any other Bidder, or
to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder,
or to secure through any collusion. conspiracy, connivance, or unlawful agreement any advantage
against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any
other of its re ts, represe[ tatives, owners, employees or parties in interest, including this
Affiant.
Curtis lee, P.G., Florida District Manager
(Printed or Typed Legal Name of Affiant)
State of 5L County of (J~I)C)-^-
Sworn to and subscribed before me this 0> I day of
Auq l)~ +-
, 2007 by
Llc(S\-L ~.
Notary Seal:
~<iJoU{f~ GA YLE M COSTANZA
~ ~ '" MY COMMISSION # 00534628
"qOF""tl~ EXPIRES: Mar. 30. 2010
(407) 398.(l153 Florida NotaJy SllIVice.com
Personally Known: ~ or Produced Identification
Identification Produced
.