HomeMy WebLinkAboutKimley-Horn & Assoc.
It -::~ ~
t:~"
;:--=."
:: "'t' -J _
;,,- ..J
} "
..
~
-
r:~
.-
.- -
~
'.
'.
I.
I.
.
.
.
.
.
.
I.
i.
.
-::
'-
i ;~
. --
~
4-
'y"
( -
~~
;~ (
.~ -'
~
,.
-~ ..-"."!!I
A -
Professional D~ign Services for the
.,
~ ~_.... .::x
-..-~:=~~-
. 2 ..;:'~:-'-- - _
~- =~:-=-~-:;.
- --- - -- ---
--. -.,.. ._. - -
i'.--
I.
,.
-......".'..
. .:~~'-.
~.i
-:.
.
10
..~ -~---- "
.ir m .eo' ~~c;.
...,..... r "," ,- -. r-~~ --
~:.~ - -. -.-::
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
"..
~'
..
,
,
~
---~
-:.
~=~
Kimley-Hom and Associates, Inc.
.
1691 Michigan Avenue
Suite 400
Miami Beach, Florida 33139
TEL (305) 67~:~~~~J e I L.,.J
FAX (305) 67~ I' '!> v
~~I ~~ "
~Jf?(
lJ H G
URBAN RESOURCE GROUP
l OIWISlCIll Of KlI~ln HORN lllO USOtIATU, lilt
October 9, 2007
Mr. Rick Conner
Director of Public Works
Sunny Isles Beach Government Center
18070 Collins Avenue
Sunny Isles Beach, Florida 331660
OCT 1 D 2007
Clly at Sunny 1MB. 6e&ct1
Office 01 the City Clerk
Dear Mr. Conner:
The Sunny Isles Beach shoreline and Collins Avenue corridor have been improving steadily; Kimley-Horn and Associates,
Inc. and our selected team partners have supported these changes over the past 20 years. The City's commitment to provide a
vibrant new park space with much needed park and beach parking, as well as a connection to the shoreline, will further
strengthen the Collins Avenue corridor, Our team has participated in a broad range of private development and public
infrastructure projects in the area surrounding the Heritage Park site, so it is with a great deal of personal and professional
pride that I submit our qualifications to you.
Project Manager with a Resume of Success on Similar Complex Projects. I will serve as the your project
manager and lead park planner/landscape architect. As a land planner, urban designer, and landscape architect, I have 26
years of experience with America's most successful cities, counties, community/property developers, and entertainment
companies. I have had the opportunity to participate in the creation of landmark master-planned communities and parks and
understand the importance of building to own and maintain for the long haul. One of my most notable projects is The
Walt Disney Company's Disneyland Paris, where I served as the facility design manager and lead landscape architect for the
park's Guest Entry Sequence, a $50-million sequence of structures and open spaces related to resort guest arrival: by foot,
car, bus, taxi, and train. I managed a team of 15 in-house planners, architects, interior designers, landscape architects, and
graphics personnel and also coordinated a sizable team of French designers and construction managers. My experience and
attention to detail will help guide this project to a successful conclusion.
Jerry Ingram, P.E. will serve as the principal-in-charge on this project. A principal and owner of the firm, Jerry has been
involved in professional planning and transportation engineering activities for 40 years. He directs and serves as client liaison
for a range of public and private sector projects. Our quality control/quality assurance manager, Aaron Buchler, P.E., has more
than 10 years of experience in land development, utility systems, and drainage design. He has extensive experience with
entitlements, community development districts, the regulatory agencies and permitting processes in South Florida, including
South Florida Water Management District and DERM permits.
Our Team Understands the City's Desire to Develop Thoughtfully. We know that this project will be a
multidisciplinary effort, and we are well versed in all aspects of the scope of services outlined in your RFQ. Therefore, I have
assembled a local team that truly understands the City's desire to develop thoughtfully, providing a full range of associated
facilities such as schools, street improvements, and in this instance, a new park. Our team brings local expertise along with a
national perspective to this important project. We firmly believe that you deserve the attention of a team already engaged within
the City and one that is familiar with your staff.
UZ290066.07-Q Heritage Park & Parking Garage.qxp
@2007 Kimley-Horn and Associates, Inc.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.......-J-n Kimley.Horn
~_U and Associates, Inc.
Mr. Rick Conner, Director of Public Works, Sunny Isles Beach Government Center
October 9, 2007, Page 2
Kimley-Horn's approach to every project is tailor-made, and we have developed an approach for this particular project that is as
unique as Heritage Park. Our collaborative design approach integrates the market conditions and economics of the project and
ensures that we will deliver construction documents that are code buildable and reflect the timely execution of your funding and
development schedules. We understand your expectations and we are committed to meeting and exceeding them.
Subconsultants and Special Resources to Strengthen Our Team. We have assembled a team of
subconsultants and special resources who have specific technical and design experience for exactly this type of project. In
addition, several subconsultants have direct experience with the City of Sunny Isles Beach. Some of our partners on this
submittal include:
Kobi Karp Architects and Interior Design will lead the effort on all enclosed and freestanding architectural park
structures, the parking deck, and associated facilities. In addition, they will provide interior design services. Notable
projects include Meridian Condo Hotel, Sunny Isles Beach Marina Condominiums, St. Tropez Condominiums, The Strand
on Ocean Drive, The Astor Hotel, The Cadillac Hotel, and The M-Resort.
Communikatz, Inc. is recognized for community, governmental, and media relations. Under the leadership of Ric Katz, the
firm is known for public involvement and consensus-building efforts on projects such as Miami Beach's Collins Avenue
Reconstruction Project and the current South Florida East Coast Corridor Transit Analysis.
Guidance Group will be responsible for graphics and wayfinding signage, Richard Golber provides design, costing, and
fabrication expertise to streamline this effort which translates into savings for the City.
O'Brien Lighting, Inc. will provide lighting design in conjunction with our local lighting representatives, Municipal Lighting,
Bureau Veritas Certification North America, Inc. will handle geotechnical engineering.
Schwebke-Shiskin and Associates, Inc., a long-standing partner of Kimley-Horn, will be responsible for surveying.
Sensitive to the Pivotal Role of Meaningful Public Involvement Programs. Community consensus, derived
through creative engagement with the public, key stakeholders, and the City, will ultimately be the measure of success for this
project. Kimley-Horn and our partners, Kobi Karp and Communi katz, know how to get that done. We designed the Miami Public
Parks and Streetscape and the Miami River Greenway now being installed. The pivotal element for all projects was the
consensus-building effort that resulted in a groundswell of support for the improvements. As your management team for the
Heritage Park project, we will further refine your vision through structured collaboration with both the City and identified
stakeholders.
Unparalleled Local and National 8esources. Kimley-Horn has been providing multidisciplinary services to municipal
clients for more than 40 years. We are made up of more than 2,400 professionals and staff across the country, including
planners, landscape architects, civil engineers, utility engineers, roadway engineers, environmental scientists, and artists, With
nearly 800 employees in Florida and more than 260 in South Florida alone, our ability to serve the City of Sunny Isles Beach is
unparalleled.
Project Manager Committed to You. I may be reached in the office at (305) 673-2524, or on my mobile telephone at
(786) 253-9155, and via email atjack.perry@kimley-horn.com. You have my personal commitment that we will dedicate all the
appropriate resources of the Kimley-Horn team to the City of Sunny Isles Beach,
Very truly yours,
KIMLEY.HORN AND ASSOCIATES, INC.
~
Jack M, Perry, RLA, ASLA
Associate
UZ290066.07-0 Heritage Park & Parking Garage.qxp
@2007 Kimley-Horn and Associates, Inc.
~~- - ~~-
~t:;..or"" - -: ~
_Z::J::
~~ -~ ~
-..... ..
~-'-~
~ _;!-"1
:--: j
...
.~ ; 1
;;: --'-'C f
- ~", j
..~.. ":i ~
" ~-~ -
\'~1
\
.j
.
.~~
.t~~ i"" "-
. ~,~ ~-
1-,;:-~
.'" ~~~ ~
~.-Co I:
.~~--
- --- - -- - -
..r,:"- -
l ~~_ ;;~~-:. ~
.--~- -
-.~ -- - - -
.~" ,~f;'" '";:_ =_
, ...._~-.-. - -
~~~-- ~~.
"--A ~- '=- ---:: -
t~i~"~~ ~i,-~-,,: -~-
~~~-~ ::;.- ~~;z ...~ ~
:-::.::--=......,.j;, ..::; ,.:-'~ r;"'-;:;
-:--:.-:.-..; -. ..- -
~- .._~ -'. ~
.
I
.
.
I
.
I
.
I
.
I
.
t
!_ 0::0;: ~ -~~~~~llOitmrlID!',~.;~ I
..~...~~ -~ .~~ - ~
~-~~--~-.~~....~. =-
...=.! ~'~ -(.~
.~ _ _ ~ ~"'J!;. '-~,;..,....
. .--" ~ ...~ --,
.~.,:-: -~-. _. .'
.r,,,,"_ _._ '. .,.
.- "
f
t,J-
,...
:-::
~1
..'!'"''>t':'''r.'~' :'" .~~. "j' :.;, .,~~:
. r.:~-..., .
,', "..
l~L. "::;,
. .,~', ..:..,.:.(..!,/;r:.*.~'~;~
. :'.J:-=';i2;:;t~~~..fJ
'i'.~_
'- I
~
Professional Design Services for the
Rerita e ~.l! l_ ~.J~'l._
ad Parking Garage
RFQ No. 07-08-01
TABLE OF CONTENTS
Section
Tab
Firm OveIView ......................................1
. History and Overview
. Subconsultants
. Persons Having Financial Interest in the Firm
. Financial State of the Firm
. Annual Revenue for the Past Two Years
Tecltnical Competence ...............................2
. Project Manager
. Meeting Time and Budget Requirements
. Cast-Ahead System
. Quality ControVQuality Assurance
. Organization Chart
Project Understanding and Approach ....................3
. Management Approach
. Overall Approach, Methodology, and Understanding
. Phase Summary
. General Project Management
Similar Experience ...................................4
Additional Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
. SF 330
. Public Entity Crime Statement
. Non-Collusive Affidavit
. Rorida Business Licenses
l,
~-n Kimley-Hom
~_u and Associales, Inc.
UZ290066.07 -0 Heritage Park & Parking Garage.Qxp
@2007 Kimley-Horn and Associates, Inc.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
("
..
I
"-
~
----......
Firm Overview
Kimley-Horn and Associates, Inc. is a full service
multidisciplinary consulting firm offering a broad range of
planning, design, landscape architecture, and engineering
services to local, state, and federal governmental
agencies; private developers; and commercial, industrial,
and agricultural interests with 2,400 employees and 63
offices nationwide.
Urban Resource Group (URG), a division of Kimley-Horn,
is renowned for their work on redevelopment, streetscape,
urban renewal, and town planning projects nationwide.
URG's urban planners and landscape architects
emphasize pleasing visual environments, meaningful
themes, a distinctive image, and a strong sense of place,
They are also experts at developing public involvement
programs, directing community workshops, and promoting
consensus on complex redevelopment and improvement
programs. URG provides these services from one of the
largest landscape architecture and urban planning studios
in Florida.
As a single entity, Kimley-Horn is able to provide full-
service design through engineering and construction for all
types of land development projects, Through our close
working relationship, we are able to take a creative, though
realistic approach to problem solutions.
Founded in 1967 by transportation engineers in Raleigh,
North Carolina, Kimley-Horn became well known for its
expertise in transportation planning and traffic engineering.
In the early 1970s, the firm built an impressive record of
accomplishment in regional and urban area transportation
planning, traffic impact analysis, parking planning and
design, traffic control system design, and statewide and
local traffic operations and safety studies, During this
period, the firm also added practices in structural, highway,
and bridge design, as well as airport planning and design,
In 1983, Kimley-Horn merged with Hutcheon Engineers of
West Palm Beach, Florida to enhance its general civil and
surveying practices. In 1987, Kimley-Horn opened its first
Florida-based URG office in Vero Beach to better serve the
UZ29OO66.07-0 Heritage Park & Parking Garage.qxp
@Zoo7 Kimley-Horn and Associates, Inc.
-...;..; ~1. l'..t.
...,....;,f~
needs of clients and respond to the potential that the
Florida development market held. Further diversification of
Kimley-Horn's services and geographic practice followed
over the years through key acquisitions and mergers, as
well as the hiring and development of our own practice
builders.
At Kimley-Horn, we cultivate practice builders-individuals
who seek out opportunities and establish themselves and
the firm in a new or existing service area. Practice builders
focus their efforts on solving problems for our clients.
Practice building is the foundation of our success and
integrates leadership, technical, marketing, and business
skills, The firm's commitment to growth and reliance on
practice builders to fuel that growth by taking advantage of
niche markets has enabled Kimley-Horn to become one of
the most respected and fastest growing full service
consulting engineering firms in the United States.
Much of our growth extends from the confidence and trust
that clients have in us, Kimley-Horn's long record of
technical achievements is enhanced by our reputation for
effective management and personal service. The
principals, associates, and technical directors at Kimley-
Horn have formed successful and long-lasting relationships
with our clients because we believe in solid firm
management combined with technical excellence. In
addition to project work, each individual plays a role in
maintaining the policies and practices, which have helped
us build an unusually experienced and stable professional
staff, a strong project management system, and a close
professional rapport with clients and public officials.
Kimley-Horn has been honored with awards
from the American Planning Association
and the American Society of Landscape
Architects and our growth is reflected in our
steady rise on Engineering News-Record's
list of top 500 design firms in the nation.
This week, we were again rated by CE
News "#1 Top Engineering Firm to Work
For," while Fortune magazine rated the firm
"#28 in the Top 100 Firms to Work For." This growth and
~-n Kimley-Horn
~_U and Associates, Inc.
1-1
lJ I~ G
URBAN RESOURCE GROUP
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
r
"..
~
I
"
I.
.--- '" -:.
success has been accompanied by a steadfast
commitment to providing responsive client service,
pursuing Continuous Ouality Improvement (COI) policies,
and operating as a business-based practice,
With nearly 800 employees in Florida and 260 in South
Florida alone, our ability to serve the City of Sunny Isles
Beach is unparalleled. We will serve you from our Miami
Beach office:
1691 Michigan Avenue, Suite 400
Miami Beach, FL 33139-2557
Phone: 305-673-2025
Fax: 305-673-4882
.J JlcboovDlo
. \
, .-OCiB- \
_ - _VDfulla
nfrLllua ~ ~.
lB._ In \(!
Ta - .
~ laD/II. . VBI'9 Beacll
SlIraloll~ _ - - IlJJclo
NII'lIIPurt- ,_nil
CBlIB ~ . - well Palm Beach
~,
. ~:- Oa1ll_
~-. T~bi.
P!nmna CIy ~, ',If"-...
.,;/ ,
.....
Florida
Office l.ocal;ol1s
FwllllDderd3lB
..........,
,-
To enhance Kimley-Horn's capabilities, we have added to
our team the nine specialty subconsultants listed below,
Architecture
For more than two decades, Kobi Karp Architecture and
Interior Design (KKAID) has been providing creative and
innovative design solutions to renowned clients in the
hospitality, retail and high-rise residential development
community. The firm specializes in architecture, interior
design, and planning. KKAID is headquartered in Miami
and its profile extends beyond the typical architectural firm
by offering a diverse range of services relating to
buildings, from planning through design, construction, and
UZ290066,07-0 Heritage Park & Parking Garage,qxp
<92007 Kim/ey-Horn and Associates, Inc.
'.
~~;~
management. Kobi Karp, the firm's principal, is a
recognized member of the American Institute of Architects,
honored for his award-winning designs and buildings.
Public Relations/Public Workshops
Communikatz, Inc. is a full service public relations
agency whose primary specializations are public affairs
issue management and situation management for both the
public and private sectors. The firm develops and conducts
public information, public involvement, public awareness,
and community relations programs. In addition to
maintaining strong ties with the news media, Communikatz
is recognized for its energy in the field staying in touch
with South Florida's diverse publics. The firm is known for
its expertise in coalition-building, grassroots advocacy, and
policy research and analysis,
Graphics/Wayfinding
Guidance Group provides design/build and consulting
services specifically in the streetscape information and
signage and wayfinding areas. They have also expanded
into the hardscape lighting and amenity areas. Guidance
Group was started on the principle that the correct use
and placement of information on the streetscape provides
the user with a safe and easy way to negotiate arrival at a
final destination, Their specialization in this area is also
linked to the premise that good sign graphics, legend
identity, and structural design together-a sign information
unit-are of enormous benefit to communities when built
and installed properly.
lighting Design
O'Brien lighting, Inc. is an industry-recognized full
service lighting design and consultation firm specializing in
commercial and residential architectural lighting. O'Brien
Lighting's staff consists of top performers with exceptional
skills in design and design production with its principal
designer having more than 20 years of professional
lighting design experience, While sustainable, O'Brien's
designs are intuitively conceived and anchored in sound
visual guidelines, O'Brien Lighting maintains a highly
efficient, productive and professional environment
collaborating with top developers, architects, and interior
designers.
lJ B G
~-n Kimley-Horn
~_ U and Associates, Inc,
1-2
URBAN RESOURCE GROUP
A DI'lltON Of KIMU'.Mll~N 11I0 lUOCl,IHI,IIl(
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
r
40
I
"
,'!
---~ ..,.
Geotechnical
, In 1985, Intercounty (Bureau Veritas Certification North
America, Inc.) opened their doors in Miami-Dade County
in an effort to provide quality construction materials
testing, laboratory analysis of materials, inspections, and
geotechnical and environmental consulting services to
public and private clients in South Florida. Today, they are
part of the growing U,S. Laboratories, Inc. family-a firm
that represents more than 20,000 technical, professional,
and support personnel worldwide.
Survey
Schwebke-Shiskin and Associates, Inc. is a multi-
faceted company offering complete services in land
surveying, civil engineering, geotechnical engineering, and
land planning. The experience of this firm includes site
planning, platting, boundary and topographic surveys, and
right-of-way surveys.
MEP
Franyie Engineers, Inc., offers engineering consulting
services in heating, ventilation, air conditioning,
refrigeration, plumbing, electrical power, and lighting.
These services are offered for all types of commercial
structures, major high-rise apartment buildings, important
office buildings, and large refrigerated industrial
installations and warehouses,
Water Feature Design
Hall Fountains, Inc. is a full line water feature design
equipment manufacturer firm. Hall Fountains designs
fountain systems and manufactures all components for
their fountain systems directly, preferring to sell complete
fountain system packages with single source responsibility
for both performance and warranty.
Irrigation
Sweeney & Associates, Inc. is an irrigation consulting
firm specializing in irrigation system design, master
planning, and water management. Over the past 16 years,
Sweeney & Associates has completed irrigation designs
for more than 5,000 projects across the U.S, and
internationally,
UZ290066.07-0 Heritage Park & Parking Garage.qxp
@!z007 Kimley-Horn and Associates, Inc.
- ,..:~ - ~ .~~~JijiIJt~.JlitJ'Jmr..I\j~ :I1tm
, ~ -.---::---Ji'-......::: -
, ~ ...-
l t1 ad ~~-G
~ .~. ~ ~ -~ --....-. . I . I
.J-L. ~;!~.... ~:.' ., '.
:,. ....,........ 'It
Financial Analysis
URBANOMICS, Inc., is an urban and real estate
economics consulting firm that provides research and
consulting services in economic, community, and real
estate development to local governments, public agencies,
development organizations, and private interests.
Kimley-Horn and Associates, Inc. is wholly owned by
Associates Group Services, Inc., which is wholly owned by
APHC, Inc. APHC, Inc. is owned by 267 individuals who
are Kimley-Horn employees. Because this number is high,
we have listed the six shareholders with the greatest
percentage of shares below. If the City requests it, we will
be happy to provide names and addresses of the other
261 individuals.
Employee Name % of Shares Address
Mark S. Wilson 4.98% 3001 Weston Parkway
Cary, NC 27513-2301
Robert G. Wright 4.88% 3001 Weston Parkway
Cary, NC 27513-2301
Donald L. Bartlett 4.61% 12700 Park Central Drive, Suite 1800
Dallas, TX 75251-1516
Michael N. Byrd 4.61% 3001 Weston Parkway
Cary, NC 27513-2301
Barton J. Barham 3.34% 4431 Embarcadero Drive
West Palm Beach, FL 33407
Thomas J. Bagby, III 3.05% 501 Independence Parkway, Suite 300
Chesapeake, VA 23320
Following this section, we have included a letter from
William A. Litchfield, Senior Vice President & Relationship
Manager of Wachovia Bank attesting to Kimley-Horn's
financial state.
2006 - $379 million
2005 - $292 million
lJ I~ G
~-n Kimley-Horn
IIIIIII.....I_ U and Associates, Inc,
1-3
URBAN RESOURCE GROUP
.
.
.
.
.
.
.
.
.
.
I.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.-
~
I
"
Ii
(,
Tethnital (ompelente
---- '"'
Jack Perry, RLA, ASLA
Miami Beach
1691 Michigan Avenue, Suite 400
Miami Beach, FL 33139-2557
Phone: 305-673-2025
Fax: 305-673-4882
E-mail: jack.perry@kimley-horn.com
Jack Perry is a practice builder and senior landscape
architect in Kimley-Horn's Miami Beach office. His 26 years
of diversified experience in landscape architecture, urban
design, and resort and town planning encompasses a wide
range of projects including Florida City, Harmony Institute,
the Disneyland Paris Resort, Callaway Gardens, Dorado
Beach, and the Punta Cana Resort. His projects range
from the site-specific to the regional scale, within the
United States, the Caribbean, Brunei, and France.
He has extensive experience in the fields of new town
planning and resort development, facility design
management, architectural conceptualization, and
construction, Jack has worked with some of the country's
top firms and clients, including the Irvine Company, Hart
Howerton, Rancho Santa Margarita, Vail Resorts, The Walt
Disney Company and the Rockefeller Family. Since joining
Kimley-Horn, he has focused his practice to high-rise and
commercial redevelopment projects including Omni
Development, Empire World Towers, Florida City Center,
1400 Biscayne Boulevard, Fisher Island, and RiverFront.
An organization chart illustrating team structure and
availability follows this introduction. Resumes for key
team members can be found in the SF 330 (Section 5).
UZ29oo66.07-Q Hentage Park & Parking Garage.qxp
(92007 Kimley-Horn and Associates. Inc.
Kimley-Horn pledges to devote the necessary enginee~ing
and management services to successfully complete this.
project. We will provide the City of Sunny Isles Beach with
a strong local presence, maximize our local staff, and have
experts across the country available for technical support
to ensure all aspects of the project are covered.
Our project manager, Jack Perry, has analyzed the
current workload and determined that the proposed staff
can be readily available for the City's upcoming project; the
percent of time listed on the organization chart behind
each person's name is approximately what each team
member has available to commit to the Heritage Park and
Parking Garage project.
Our proactive approach to budget and schedule control
begins with immediate and clear communication. At
Kimley-Horn, production meetings are held weekly to
enable staff, task managers, and project managers to stay
up-to-date regarding current and projected workloads.
Weekly regional production meetings are also held to
assess the availability and distribution of resources among
Kimley-Horn's 21 Florida offices. We know the importance
of meeting our clients' deadlines, and we take the
necessary steps that enable us to confidently commit to
meeting yours. With our depth of staff and project team
partners, and ability to activate resources from other
offices, we can ensure your projects are completed on
time. In addition, Kimley-Horn uses a management
information system to continuously track our financial
performance and productivity. It is part of Kimley-H.orn's
philosophy not to operate individual offices as profit
centers. Rather, we make it a practice to share our depth
of resources firmwide.
lJ I~ G
URBAN RESOURCE GROUP
~-n Kimley-Horn
-...J_U and Associates, Inc.
2-1
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
f
,
"
W ~r
Professional Design Services for the
Bedtai I
.--- '"'
One of the key elements of this management information
system is our cast-ahead system. The cast-ahead system
is a proprietary program that is maintained on our
computer network and is accessible by all project
managers. It is the primary means of tracking and
evaluating our staffing needs. Updated monthly by the
project managers, the cast-ahead system is used to define
specific staffing needs for the month and for the next six
months. The input required of the project managers
includes individual project names, as well as requests for
specific personnel to work on these projects for a certain
number of weeks. The combined input from all project
managers is compiled and distributed in the form of a
report to all project managers and regional management
for review and discussion at the monthly cast-ahead
meeting. Work overloads and/or shortfalls for specific
personnel, individual offices, and disciplines are tabulated
and addressed at the meeting. Where possible, these
imbalances are resolved through internal shifts of
personnel between offices. The objective is to balance the
workload in a manner that maximizes the utilization of
production staff, while ensuring that all project
requirements and client deadlines are met. This tool is yet
another example of the importance Kimley-Horn places on
client service.
The members of our project team were selected using two
criteria:
. Experience with similar projects
. Availability to assume major technical responsibilities
for the Heritage Park and Parking Garage project
In addition, they have the experience required to develop
appropriate targets, tailor suitable courses of action, and
provide timely decision-making for any unexpected
challenges that may arise. Based on a review of our cast-
aheads, we can assure you that the staff members
selected for this team are indeed available to serve on this
contract and are in an excellent position to handle the
workload of any resulting assignments. Jack Perry has
assembled the designated team members, will mobilize
them immediately when necessary, and will expertly
coordinate all efforts on this assignment.
UZ290066.07-0 Heritage Park & Parking Garage.qxp
@2007 Kimley-Horn and Associates, Inc.
.,',.~
., . 'Lll III 1
.;~~.
A key part of quality control is quality people. We will
provide you with a team of experienced and technically
proficient professionals who know how to implement this
kind of project. The Kimley-Horn team offers you the
perfect combination of relevant experience, expertise, and
proven cost control management techniques. We achieve
quality through adequate planning, coordination,
supervision, technical direction, and the use of
appropriately skilled personnel.
Our internal OC/OA program will include:
:I An internal kickoff meeting held with key team
members assigned to the job to clearly define the
scope, outline sub-task responsibilities, establish
schedules, and identify project milestones and goals.
:I At the end of each phase, a OC/OA review will be
conducted as one of several final checks to make sure
that the project deliverable is not only technically
correct, but also consistent with your objectives.
Ouality projects don't happen by accident at Kimley-Horn.
Our people have been firmly committed to top quality
since the firm began 40 years ago, and ultimately our
people are responsible for exceeding your expectation for
quality. Ouality control/quality assurance means much
more to us than a cursory review. Kimley-Horn's OC/OA
measures are built in to our project management
processes, and they are part of our firm's culture,
Yes
__. Comments! No
. 4 . Rev~ton.
..
...
~~
Com~ntal
evw5lOn
?
No
---
.,.
lJ I~ G
~-n Kimley-Horn
~_ U and Associates, Inc.
2-2
URBAN RESOURCE GROUP
1
~
--
\~"-
~
0) --
~ "'-- ~I
$? ~
~1f
UI
.2: .
,,0)
~\ -
~~'C ..
c: ..
.~ ..,
~=
.t1
Ji5
!~~
, .
o
z
ea~
~
1
II.
c.;)
E
en
Q)
c:::ai
0.-
:r:g
,00
a;-~
E"'C
S2~
~
II
~
-
-
'"
(I:l
...
-
=
Cl
'"
c;)
:c
-
...
Cl
-
=
II)
E
-
's
E
Cl
'"
<JE!
-
"
o
:8
o
o
0-
N
N
~
~-
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. UZ29oo66.07 -0 Heritage Park & Parking Garageqxp
@2oo7 Kimley-Horn and Associates, Inc.
.
.
t
~
t
'"
~
---~
Projett IJnderstandine and ApprOath
Over the last 40 years, Kimley-Horn has developed a
national and local reputation for successfully implementing
large scale, streetscape and urban redevelopment projects
for public clients. As your management team, we will be
responsible for the further refinement of your vision
through team management; interactive collaboration with
the city and identified stakeholders; preparation of design
and construction documents; and development of urban
landscape regulations,
We understand that this project will be a multi-
disciplinary effort, and we are well versed in all areas of
the scope outlined in your RFO. We understand the
City's expectations regarding the protection of your
vision, commitment to quality, timeliness of
deliverables, and respect of budget. Community
consensus, derived through a collaborative process in
which our team can engage the public, key stakeholders,
and the City, will ultimately be the measure of success for
this project.
We understand from the kick-off meeting that there are
varied degrees of detail completed for Heritage Park and
that not all elements of the schedule and final program
have been fully identified. We believe in the course of our
work, new elements may be identified that require further
detailing by the team.
We propose the following phases:
':J Conceptual design
':J Schematic design
:J Design development
~ Contract documents
. Construction phase services
. Construction administration
The efforts listed below may be integral components of
several design phases of the project:
. Survey and observations
::I Research of historical references
. Review of pertinent plans studies
::J Integrated economic analysis and market study
. Traffic analysis, pedestrian and bicycle mobility
. Project meetings and stakeholder interviews
::I Community meetings
Survey of Existing Conditions, Research of
Historical References, and the Review of any
Pertinent Plans and Studies
The team will spend up to a month field verifying the
survey, collecting any historical references, and reviewing
pertinent plans. Our longstanding relationship with
Schwebke-Shiskin has proven successful in major
surveying re-platting efforts, including Bayside and
Midtown Miami.
Integrated Economic Analysis and Market Study
When the concept(s) are complete, we will evaluate them
again from an economic and market perspective, This
iterative process will result in an economic and market-
supportable master plan. We will finalize the economic
development strategy and prioritize the projects based on
both the City's and community's priorities, as well as
economic sustainability.
Traffic Analysis, Pedestrian and Bicycle Mobility
Traffic analysis for this project includes public
transportation (buses, taxis, and shuttles), automobiles,
boats, bicyclists, and pedestrians. Collectively, human
mobility is a critical part of this project. Our approach is to
emphasize walkability and focus on multimodal
transportation that effectively integrates transit, bicycles,
and other modes of travel. We will emphasize compatibility
of roads with adjacent environments, including nearby
waterways and primary pedestrian corridors.
lJ I~ G
tDI'I'ISIOIlOfltl'llFT.MORlIlMOIUOCIATU.IIlC
.......-J-n Kimley-Horn
~_U and Associates, Inc.
3-1
URBAN RESOURCE GROUP
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
~
..
'"}$I'
.-
.f
Professional Design Services for the
~
t
Hentai
,
,~
..--- ""'
Project Meetings and Stakeholder Interviews
Project manager Jack Perry, will hold team meetings
with the City and design team every two weeks for the
duration of the project. In addition, he will hold weekly
meetings as needed or as requested by the City. This
is the only practical way to ensure schedule adherence.
During the research and data collection phase of the
project, we propose holding one-on-one interviews with
key stakeholders, including City officials, to understand
their issues, concerns, and ideas.
Community Meetings
The design team, with input from the City, will prepare a
schedule for community meetings, The final determination
of the park scope of work and associated schedule will
affect this schedule, and we anticipate the park will have at
least two community meetings to finalize the design
development prior to initiating the contract document
phase. Our public meetings and workshops are very
interactive and we will provide project base maps,
historical research findings, and photo documentation for
6-8 round-tables led by a design team facilitator.
The public design workshops will include the following
subtasks:
. Design of workshop format
. Base map creation
. Community design workshops/public involvement
campaign
Design of Workshop Format
Our goal is to develop a public participation process that
engages the full spectrum of the community. To
accomplish this, we will:
::J Listen to people
. Document their concerns, issues, and visions
::J Incorporate their input into our design solutions to
build community support for the plan
Base Map Creation
We engage the public participation process to verify the
project base map and the extent of the project
improvements by:
UZ290066.07-0 Heritage Park & Parking Garage.qxp
@'2007 Kimley-Horn and Associates. Inc.
iil< 1.1Tl
.J'" ~;:~ -
~ Providing base survey information and pertinent site
analysis information to encourage a diverse group of
shareholders to identify all interest groups' particular
focus and conflicts
~ Building community support for the plan as we
proceed
Community Design Workshops
We will prepare community design workshops that will
provide concise, easy-to-read/understand presentations
and summaries of the concepts, ideas, issues, and design
options. Kimley-Horn recommends videotaping and
televising each design workshop and replaying them
throughout the month on your local public access
television channel.
Plan Drawing and Perspective Illustrations
We will begin the first round of plan drawings and
illustrations after the first design workshop and will
continue to revise/refine the plans and perspectives prior
to inclusion in a park master plan booklet.
Park Master Plan and Booklet
Our community-based master plan for Heritage Park will
address the continuous access to and between the park
and existing developments along the Collins Avenue
corridor and the beach, As previously described in the
research and data collection portion of this section, our
iterative approach to economic and market viability
throughout the master planning process will serve to
evaluate the feasibility of the plan,
Agency Coordination
We will prepare a complete listing of pertinent local, state,
and federal agencies and actively copy all identified
agencies on the following: 1) project team member
information 2) project work plan and schedule and
subsequent updates 3) all milestone decisions and
submissions, and 4) updated directives issued by the City.
Additionally, Kimley-Horn will create an internal agency
and team FTP site, as well as an external public access
FTP site to post information, This information will be
monitored and updated bi-weekly.
lJ I~ G
.......-J_ n Kimley-Horn
~_U and Associates, Inc.
3-2
URBAN RESOURCE GROUP
I IlIYISIOII OJ KIIolUT,IIG.'" IIlOIUOCLUU,tll{
~7
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. UZ290066.07-Q Heritage Park & Parking Garage.qxp
IQ2007 Kimley-Horn and Associates. Inc.
.
.
f
,.. -
~
,
'"
~l
----- ......
Conceptual Design. A two to three-week period of initial
meetings, research, and conceptual design detail, followed
by a review by the team and stakeholders of the
concept(s), followed by the refinement of a selected final
concept.
Schematic Design. We will schedule an accelerated
period to prepare 50 percent schematic design
development documents, followed by an internal two-week
review. An initial opinion of probable cost (OPC) will be
prepared, During this phase, we will also focus on the
following efforts: research and data collection, public
design workshops, translation and refinement of the park
plans for the creation of alternative concepts and an
overall master plan, and final documentation of the park
master plan,
Design Development. Upon the review and approval of
the schematic design documents, we will further refine
your vision with greater detail to the plans and update the
OPC. We will then determine a realistic schedule for the
100 percent completion of the park's design development
documents,
Construction Document Preparation - Final Design
Phase. The Kimley-Horn team will prepare complete
construction documents suitable for competitive bidding.
Opinion of probable construction costs will be updated as
the project details are developed. Pre-application meetings
will be held with review agencies and permit applications
will be prepared and submitted,
Public involvement will continue in this phase to inform the
public of project progress. It is important that we keep
residents informed to meet those goals set during the
preliminary design phase. Milestones during the final
design phase include a kick-off meeting to authorize the
start of final design, confirmation of project scope,
objectives, and schedule; design reviews at completion of
30, 60, and 90 percent plans; a public meeting to present
the project design, updates, schedule, and funding plan;
and permit applications,
Deliverables during this phase include complete
construction documents, drawings, and specifications
suitable for competitive bidding. Applications for necessary
project permits will also be provided and permit approvals
will be pursued, Graphics and presentation materials used
at public meetings will be provided, and when necessary,
grant applications will be prepared.
Construction Phase Assistance. The final step will be to
build the project. Kimley-Horn will provide bidding
assistance and construction phase services for the City.
Milestones during this phase include advertisement of the
construction project; notice to proceed with construction;
and certification that construction is complete and in
compliance with the plans and specifications.
Deliverables in this phase include complete record
drawings and construction certification. While these project
milestones are key steps toward successful project
completion, we believe the best-run projects are those that
employ effective communication throughout. We
accomplish this by providing weekly status reports (with
meetings, when desired) that emphasize thorough
coordination and communication with the City. We will:
1, Prepare an up-front public agency action plan and
establish project schedules that will help to make
project development, design, and construction as
easy as possible
2. Review shop-drawing submittals from the selected
contractors
3. Hold periodic construction observations during
construction. The number and duration of site visits
will be determined by the City and the team following
the completion of the construction schedule (includes
preparation of site observation reports).
4. Respond to contractor's reasonable requests for
information (RFls)
5, Review record drawings (prepared by others)
6. Eventually determine the number of field visits to
nurseries in South Florida for the purpose of selecting
and tagging plant material for the project.
Construction Administration. The Kimley-Horn team will
provide construction administration services throughout
the project to include:
lJ I~ G
~_ n Kimley.Horn
~_U and Associates, Inc.
3-3
URBAN RESOURCE GROUP
IlllVllI01l0fKl"'lH.1I0INUIlUSO(UTHIII(
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
r
"..
~
I
,
"
.--- '"'
Project Administration and Presentations
Final documentation will be made up of the following
subtasks:
. Organize one pre-construction meeting for Heritage
Park
. General project management
. Task meetings
. Public presentations and meetings
!J Final presentation to the City Commission and other
related agencies
Organize One Pre-Construction Meeting for
Heritage Park
Kimley-Horn will organize one pre-construction meeting for
Heritage Park project. If funding sources delay a portion
of the project, such as the garage, discussion of
subsequent pre-construction meetings will be negotiated
with the City of Sunny Isles Beach.
The locally based project team will work out of Kimley-
Horn's Miami Beach office, just 10 miles from the project
site. Kimley-Horn will dedicate a consistent project team
throughout the duration of this contract.
Task Meetings
Bi-weekly team meetings with the design team and the
City are critical to maintaining the budget and timeline.
Jack Perry will facilitate all such meetings and be
available on a daily basis to address concerns and receive
requests and information regarding this project.
Quality ControVQuality Assurance
Kimley-Horn will have primary responsibility for quality
control and it will be carried out to the level appropriate for
the size of this project. We will translate the City's scope of
services and other contract requirements into an internal
team quality control/quality assurance (OC/OA) work plan
to identify:
. What is going to be reviewed
. Who is going to perform the reviews
. When the milestones occur that require reviews or
input
UZ290066.07-Q Heritage Park & Parking Garage.qxp
192007 Kimley-Horn and Associates. Inc.
~~, ~;!.; ./...
. How many hours or dollars are budgeted for quality
control
. Adequate time for reviews by the team, agencies, City
staff, and any subsequent response
Other responsibilities will include: communicating the
above documents to the project team; holding a project
kickoff meeting; holding project meetings; documenting
project activities/decisions; conducting project reviews (in
some cases by selected peer groups); updating client
communication regularly; performing project closeout
activities; and assuring contract compliance.
No milestone submissions will be accepted from team
members without having first completed their own internal
quality control review. In addition, no milestone
submissions will be submitted to the City or Government
Agency without a Kimley-Horn quality control review. All
documentation related to quality control reviews will be
retained and scanned for future reference.
Public Presentations and Meetings
Jack Perry and our partners, Ric Katz and Kobi Karp are
no strangers to public presentation. Jack, Ric, or Kobi will
lead all community meetings and presentations to City
boards, as well as the City Commission.
Resource Availability
Using our in-house computer network, Kimley-Horn's
proactive management system forecasts our workload
over a six-month period and is used to detail every
project's personnel needs and determine each staff
person's availability. This system ensures that sufficient
staff and effort-hours are available to meet project
schedules.
We can assure you that the staff members selected for
the team are available to work on this project and are
in an excellent position to handle the workload of any
resulting assignments. Our subconsultant and special
resources firms are also firmly on-board and ready to
start working on this project.
lJ I~ G
~-n Kimley.Hom
~_U and Associates, Inc.
3-4
URBAN RESOURCE GROUP
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
(
+
I
"
f.
.--- '"
Similar Experiente
Kimley-Horn and Associates, Inc. is a full service
consulting firm providing a broad range of engineering,
planning, and environmental services to both public and
private sector clients. Our Florida region services more
than 40 public municipalities through on-call contracts, as
well as a multitude of private clients. Therefore, it would be
difficult to list all projects within the past five years,
including those the firm currently has under contract.
Consequently, we have included information on several
projects performed within the past five years directly
related to this RFO in this section.
Included with each project description is a client reference.
You may ask why these clients picked Kimley-Horn of all
the top class consulting firms from which they could
choose. Chances are they would tell you it was because
we have a reputation for making our clients successful. We
listen to their needs, meet their schedules, accomplish
their missions, deliver results, and exceed expectations.
You simply will not find this caliber of service anywhere
else. We invite you to contact these references so that you
can hear firsthand about the outstanding quality of service
we routinely provide.
City of Miami Beach Parks - Miami Beach, FL
Miami Beach showcases a variety of active and passive
parks that appeal to tourists and the local community. The
firm was selected by the City to renovate 11 community
parks. These renovations are part of the Safe
Neighborhood Parks bond program, which provides
funding for community park improvements. The parks
range in size from one to 12 acres. Some of the park
features include basketball, handball, and tennis courts, tot
lot and playground areas, community/recreation centers,
walkways, and waterway overlooks,
We divided the City into three geographical areas to
maintain use of at least one local park during construction.
Instead of closing all the parks in one central location,
renovations occurred on a rotating basis in each area. This
allowed local residents to maintain the use of other parks
in their area while one was being renovated. We also
UZ29oo66.07 -0 Heritage Park & Parking Garage,qxp
1&12007 Kimley-Horn and Associates. Inc.
,.., -,il- ~'ttiii1
worked with the City to unify all site furnishings and
fixtures. Not only did this establish a cohesive look for the
city and each park, it resulted in a one-time-only bid and
purchase effort.
Client Reference:
Kevin Smith, Director of Culture, Parks, and Recreation
City of Miami Beach
(305) 673-7730
Completed: 2001
Total Fees Paid to Firm: $65,000
Total Cost of Design and Construction, Estimated and
Actual: $2.4 million
Project Duration: 2 years
I
~
'0 I
. QL,"
-~
\,~, ,J
'<, .
'> '" - .'
_ _.7
,'>.;
- - - - --' ~
.~
\[ia",; !1l.'lh1, ,":.!'tJl(,(-clSl'"' a l'or;ell/
0/ dl'/'l'e dl1lJ pd:;...;il'i...l f'(ll'k,..; t/,al -
uP/Jt..'t//,u tourists t.ll1tl ti'l! l,cal
CtNI1IJ,ul1ily.
lJ I~ G
........-J-n Kimley-Horn
~_U and Associates, Inc.
4-1
URBAN RESOURCE GROUP
I Dll'lltOIl Of lIMlU,WO'1I UD AUOCllUI. III'
('>. ~
( Ii
---- ""'
Royal Palm Pointe Park - Vero Beach, FL
AWARDS
Award of Honor, American
, Society of Landscape
Architects, Florida Chapter
Engineering Excellence
Award, Florida Institute of
Consulting Engineers, 2002
Engineering Excellence
Award, Florida Institute of
') ", Consulting Engineers, 2002
. ../,;,,1 "j I~"!I"II "I", 11,;,,1.. ill \..,." 1>"",/,. I I
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
This enhancement project included coordinating multiple
subconsultants, conducting several public consensus
workshops, assisting city government in applying for and
securing various grants, expediting environmental permits,
and ultimately producing a comprehensive redevelopment
plan for the 2,800-foot corridor. A key to this project's
success was analyzing the condition of the aging urban
infrastructure (roads, utilities, sidewalks, etc,) and
developing a comprehensive redevelopment package that
upgraded this infrastructure in a manner that will
encourage redevelopment while spreading the cost over a
number of state, federal, and local funding sources.
Included within the project is a three-acre urban waterfront
park including a participatory fountain, park pavilion,
multilevel plaza, bulkhead, courtesy boat slips and pier.
The total project implementation was funded through a
variety of sources including a special assessment district
for the Pointe property owners; general City revenue
sources; utility and roadway funding; and grants from the
Florida Inland Navigation District and the U.S. Army Corps
of Engineers.
Client Reference:
Monte Falls, Director of Public Works and Engineering
City of Vero Beach
Phone: (772) 978-5151
Completed: 2001
Total Fees Paid to Firm: $500,000
Total Cost of Design and Construction, Estimated and
Actual: Bid price: $4.89 million; Actual: $4,85 million
Project Duration: 4 years
UZ290066.07-0 Heritage Park & Parking Garage.qxp
m007 Kimley-Horn and Associates, Inc.
..,.,
Boynton Beach Boulevard Extension and
Promenade - Boynton Beach, FL
AWARD
Roy F. Kenzie Award - Best Capital Project/Beautification
Award, Florida Re-development Association
Burkhardt Construction and Kimley-Horn served the City
of Boynton Beach Community Redevelopment Agency
(CRA) for a boardwalk/streetscape project along the
Intracoastal Waterway involving the extension of Boynton
Beach Boulevard, This project is a part of a redevelopment
effort by the CRA to improve the City's waterfront. The
project consists of two specific elements: the extension of
Boynton Beach Boulevard from US 1 to the Intracoastal
Waterway, and the construction of a boardwalk along the
Intracoastal Waterway from Boynton Beach Boulevard
north for approximately 4,000 feet. This project will act as
the link between the private sector and public sector
redevelopment activity that has already commenced in this
area.
Client Reference:
Lisa Bright, CRA Director
City of Boynton Beach CRA
Phone: (561) 737-3256
Completed: Professional
Services: 2004;
Construction: 2005
Total Fees Paid to Firm:
$638,000
Total Cost of Design and
Construction, Estimated
and Actual: $8,839,000 -
$650,000 under budget
Project Duration: 3 years
,
~
I
....!.
1 ~~~ J ~
K;II,I..!,-II"/',, dllllpl../l'.!
ti,t.! IO!lOitf an) )l'"i~"l of a
30( J-f, I()/ ,In }1I1l"hltle!
1,,,,,/'J,,,,,lk "",) 1.3/iI) j~,,'1
III /'iL'l'I'Il'<llk <llm'tl tI".
Ill1tracoll~/al n'{,IL'ru'dY ill
I !JoLln/oll 11......,..-1,.
I -
I
lIl""'l-n Kimley-Hom
~_U and Associates, Inc.
4-2
lJ H c:
URBAN RESOURCE GROUP
. InYI~IOII Of .IMlfl,~O.1I UD U50CIAHI. IIlC
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.~-
e('d' 'l'jt'JP
~
.
r
0-
I
~
~
~
.---,
Midtown Miami and Related Parks -
Miami, FL
AWARD
First Place - Outstanding Redevelopment Study, Gold
Coast Section of the American Planning Association
Located in the heart of Miami, this 56-acre brownfield is
the largest redevelopment project in the City. Kimley-Horn
and Urban Resource Group (URG), in association with
Zyscovich, Inc., worked with the architectural design team
to develop a truly urban mixed-use master plan that can
support 4,500 residential units; 1.2 million square feet of
commercial development; and offices and parks. The
design includes nearly 12,000 linear feet of urban
streetscapes, a linear park system, an urban plaza, and a
series of vest pocket parks. Kimley-Horn authored
streetscape design guidelines for the project and prepared
a Regional Activity Center (RAG) justification report to
increase DRI thresholds. We have designed all public
infrastructure including roadways, utilities, traffic,
landscape, and urban planning. To date, the firm has also
been the landscape architect and civil engineer of record
for all private-sector developments within the project.
Client Reference:
Daniel K. Pfeffer, President
Midtown Equities LLC
Phone: (212) 726-0771
"0 ~~~-
"'"'1!.> "i.crS ~ Completed: Design:
,,"t,~:--"- . ,Or' " ~ 2006; Consulting
, ....;.~::. Services: ongoing
Total Fees Paid to Firm:
$2 million
Total Cost of Design
and Construction,
Estimated and Actual:
$26 million
Project Duration: TBD
.f.:iJ11/e~/-llnrll:~ IJhl~'er plannil1g alltllal1t/:;capl.'
{-/l.!:;i~Jn lcork lor ti,l' \/i,!tOll'l1 'Ii0J11; projt.Y/
e..,ll...Iu)eJ a 1;11\..'0,. park :;Y..../l.'111 (1l1t/ll ~";l!r;e~.;; of Ci'::,1
!"""i
. UZ290066.07-0 Heritage Park & Parking Garage.qxp
@2007 Kimley-Horn and Associates, Inc.
.
.
~ "if.
t:,
-
South Pointe Streetscape and Park - Miami
Beach, FL
The South Pointe Streetscape project was the first phase
of a capital improvements program for the world-renowned
"South Beach" section of Miami Beach. The project
consisted of complete reconstruction of drainage system,
sidewalks and a high level of finish streetscape/hardscape
including an interactive fountain, landscape, irrigation,
colored concrete sidewalks, brick pavers, street furniture,
and an at grade street events plaza,
Our firm was contracted to update the Duany Plater-
Zyberk master plan for South Pointe and prepare complete
construction documents for all the improvements. Working
closely with DPZ, we updated the master plan and
prepared a comprehensive phasing plan and cost
estimates for the City-on time and within budget.
Together with the City, we developed an aggressive
schedule for Phase I.
Client Reference:
Dale Bryant
City of Miami Beach Parks and Recreation Department
(305) 673-7000, ext. 6695
Completed: 2003
Total Fees Paid to Firm: $77,300
Total Cost of Design and Construction, Estimated and
Actual: $24 million
Project Duration: 4 years
~
..-
-
~.
~~~!k~~~~
, , - - , \ .- ""'#
, , /
-
-..
'e'
lJ I~ G
~-n Kimley-Horn
~_U and Associates, Inc.
4-3
URBAN RESOURCE GROUP
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
f
.
I
,
~
.--- '"'
- -
Coral Way Beautification Master Plan and Design
Guidelines - Miami, FL
AWARD
Award of Honor, American Society of Landscape
Architects, Florida Chapter
Under our general landscape architect services contract
with the City of Miami, the firm was selected to prepare a
beautification master plan and design guidelines for the
historic Coral Way Corridor. Preserving and enhancing the
night visibility of the 75-year old Banyan trees was a
critical component of this project. Lighting demonstrations
were conducted with the public to select the optimal
lighting effect for these historic trees. Based on the tenets
of New Urbanism, design guidelines were prepared to
regulate the building heights, setback, mass, landscape,
parking, and overall relationship to Coral Way.
Client Reference:
Enrique D. Nunez, Planner
City of Miami, Department of Planning & Development
Phone: (305) 416-1419
Completed: Design 2002
Total Fees Paid to Firm: $75,000
Total Cost of Design and Construction, Estimated and
Actual: N/A
Project Duration: 1 year
l)rL'~..;erl'"1" dJh/l..."llcl110JItl ti,t'
lIi91'1 ,'i~;}'ilill/ "f ti,e' 7':;-I/'>(//' ,,1./
15dll!lllll 'rL'L'~ tt'll~ II iTil;,',,/
C01JlpOI1l.-'II/ 0/ t11i~ /JI'ojl.'d
UZ290066.07-0 Heritage Park & Parking Garage.qxp
@2007 Kim/ey.Horn and Associates, Inc.
.
Multi-Story Target Parking Deck - Deerfield
Beach, FL
When the Target Corporation wanted to expand their store
in Deerfield Beach, Florida, an area with limited available
local property, the most profitable solution was to tear
down the existing store and build a two-story expansion in
its place. Since the new Target-the first two-story Target
store in Florida-would require more parking space than
was available on the property, Kimley-Horn was retained to
design an adjacent two-level parking facility.
The parking deck has three open stair towers, one
enclosed stair tower, and one elevator. Automobile access
to the elevated parking level is provided by an external
speed ramp that is a combination of both precast and
cast-in-place components. Precast concrete facades were
detailed to match the exterior facade of the new two-story
Target.
The design consists of one elevated parking level
constructed of precast concrete and one at-grade parking
level, all within a footprint measuring 372 by 252 feet. The
elevated precast concrete deck is supported by cast-in-
place concrete foundations, while the lower-level parking
surface is a concrete slab-on-grade. From the deck's
second level, a connecting pedestrian bridge provides
access to the store.
Size: 600 spaces,
7.75-acre site
71,;s -r..lr!1el retll,irl!,j 'Hurt! parkil19 :o::poce tlhlll H'd.=" al'ai/al..,le
UIl ti'l' properl91 so Kinllcy-llorJl Je~i~ll1l.-'(1 all aJjat'l.-'1l1 IlCU-
Il'L".1 f,(//,kiIl9 ;;,,'ilily.
U H G
~-n Kimley-Hom
III.....J _ U and Associates, Inc.
4-4
URBAN RESOURCE GROUP
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
c'
+
~ ........ --
.J..... t, r
Professional Design Services for the
Bedtat!. ,
"'-
~,'
.---,
Client Reference:
Thomas A. Bonneville, Senior Site Development Manager
Target Stores
(612) 761-1542
Completed: 2001
Total Fees Paid to Firm: $150,000 (parking structure
design)
Total Cost of Design and Construction, Estimated and
Actual: $3.25 million
Project Duration: Approximately 2 years
Target Parking Deck - Plantation, FL
Kimley-Horn provided engineering-related services for the
design and construction of a two-level (ground plus one
elevated level) parking deck for the proposed Target store
in Plantation, Florida. The existing Target store on the site
was demolished and a new store was built. Alongside the
new store is the two-level parking deck with 331 spaces.
The elevated parking deck features precast concrete
construction on shallow foundations and is 244 feet by 227
feet with the lower level being concrete slab-on-grade. The
upper level is accessed via an external express ramp. The
deck has been designed to accommodate a potential
future elevated level containing another 170 spaces. Two
functional design features are: (1) orienting the main
elevator and stair towers to promote flow into a pedestrian
plaza and (2) providing cart storage below the external
express ramp.
Size: 331 spaces
Client Reference:
Bill Zanoni
Target/Mervyn's
(612) 761-5384
Completed: 2003
Total Fees Paid to Firm: $200,000 (parking structure
design)
Total Cost of Design and Construction, Estimated and
Actual: $4,5 million
Project Duration: Approximately 2 years
UZ290066.07-Q Heritage Park & Parking Garage.qxp
@ZOOT Kimley-Horn and Associates, Inc.
~
Omni Development - Miami, FL
Following 15 years of steady decline, the Omni area is
experiencing resurgence as a part of Miami's development
boom. Created by the City of Miami, the Omni Community
Redevelopment Authority (CRA) proposed a bold new plan
for the redevelopment of the entire area located along
Biscayne Boulevard and Biscayne Bay. Working alongside
the Omni CRA and world-renowned architectural firm
Arquitectonica, Kimley-Horn is providing planning
approval, site planning, urban design, civil engineering,
and landscape architecture services. With six, 58-65 story
residential towers offering 4,200 dwelling units and
350,000 square feet of retail space, this 11.3-acre project
will accomplish the CRA's goal to reinvigorate the urban
core with people-activated streets, parks and plazas.
Kimley-Horn is also working with the City and the Omni
CRA to re-establish the City's street grid. The plan is to
divide the one super block into three smaller blocks with
NE 16th and 17th Streets once again linking Biscayne
Boulevard to Margaret Pace Park and the proposed
baywalk. Additionally, NE 17th Street will become an
enhanced pedestrian/auto retail corridor with outdoor
spaces for gatherings.
Client Reference:
Jeremy Klein
Downtown Miami Mall,
LLC
(212) 692-5413
~ .... ,'/TM..........-:p .
.t..hr~f "'~;~:z.:....
V-..........r~l- ..
r.. ,.,.. f.. "" .~ - 0
~ ~ ......, '..~."'~ "-
.. "~~'~ I
tJr [ .~~" 1--
"lJiJ~~nlg:n~~F""'Yn
n~*i-=- :..- ~.":~"l~~~ I
! . t~..,t?.: ; rJi,
~p . .~,! . n. !
i.. ... - :"l: ~
;~ ~;' I
t:~~--~::;x~
~_.' r~"~ . 'j.;,'~.: J
'tfjJJ .~ :1 '<f___
..-..:..;....'..OI.1T -
.... ':", ~........
Completed: Ongoing
Total Fees Paid to Firm:
$105,000
Total Cost of Design and
Construction, Estimated
and Actual: $8.5 million
Project Duration: TBD
KiJ11Iel/-I/ol'l1'3 lcorL 011 il,....' ()11111;
f)"I."l'plII""! pm!"!! l"ill r<"I'~!,,[,Ji.../,
ti,t.' :;;/1'1..)(>/ (1/';(1 on) 1(,;/10\_'01...) Hell'
tlldJ()()J' :>f~)(ICC3 jJI' 9all,eril1~1~.
lJ H G
.......-J-n Kimley-Hom
~_U and Associates, Inc.
4-5
URBAN RESOURCE GROUP
lDlYlSIOIlOJ.'l'lln'.1l0_IIJ.1lDUlouun.IIt'
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. --
. ^
.
.
.
.
.
.
.
.
.
.
.
.
. UZ290066.07-0 Heritage Park & Parking Garage.qxp
@ZOO? Kimley-Horn and Associates, Inc.
.
.
(,
,~
4
I
,,'"
/I.
=
.---,
RiverFront and Water Front Park - Miami, FL
As part of the renaissance taking place along the Miami
River, this 11-acre site will be home to six 54-story towers
with 3,000 luxury condominiums and more than 100,000
square feet of retail space, all connected by pedestrian
plazas and covered arcades, The plans call for 10 water
features and more than 1,000 linear feet of riverfront
improvements, which were guided by the Greenway
Regulatory Enhancement Program prepared by Kimley-
Horn's Urban Resource Group (URG) and adopted by the
City of Miami.
-.
~~~
,.,. ......-nrn ~
Tr '. ~ t~-;~~ t~
f ',c \ '- ' ·
....;'~,.. I ...."..~ ~I:!: ,
'r- ,- ~ '
r~-_ ... . ~.[- ~
. .',' f'
. 1'- .';.:, ' . . ':.
-. ,.., "~--.. ,.
,;. .. . t -. l"P~oCr
~ ' , '-." ~-'\.,''-.. . ,.iOC"t', -~:' (~
f.. ..... "" r '~\\ ;..... ,
i .' '''v:{. f;. r ~ ;.t;.t;. .:""'1.:a1-
. .... . r':::-
~h,>~,'~~' -~i~..l" ,,:,,_,~,,:''f':-_ J~;;:' ~
t-"~~~ \ , . . r..J
, , .J. -
~, -A, ,," t~ :.#,.
~' ~~
?'..; ?J
, . . ':-..J
~~4-G
.~ MIAMIRNER
Upon the successful
preparation and approval of
the River Front MUSP
(Major Use Special Project)
documents, Kimley-Horn,
with its Urban Resource
Group division, was
retained to prepare the
urban design and
construction documents for
the entire site. Each of the
six high-rise residential
towers will have a 10th floor
pool amenity deck, and
URG has also been
retained to design several of
those.
Additional aesthetic focus was placed on a project-wide
master graphics package and wayfinding system,
enhanced traffic-calming vehicular plazas, and imported
European street furniture, and pedestrian lighting. A series
of water features will begin at the SW 3rd Street project
entry, continue through the center of the main street, and
culminate in a series of cascades at the river's edge.
There, the new riverwalk will connect with the existing
improvements of adjacent properties,
Client Reference:
Antonio Cabrera
The Epoch Corporation
(305) 445-2800
--. ,
" I
n;.trTl
-.
'~
~
, ,.. j;..r -
c'~~~-d:~G
- ' . -r: ~- --=.;;;::== -~ -:---..
...... ;'~"c'- _ ,-.'1. }'.,. .,
~,. ~~;~
Completed: Ongoing
Total Fees Paid to Firm: TBD
Total Cost of Design and Construction, Estimated and
Actual: $6 million (not including towers)
Project Duration: TBD
Miami River Greenway - Miami, FL
Kimley-Horn was retained to redesign North and South
River Drives in the City of Miami to incorporate a
continuous greenway along the Miami River. The firm
developed schematic designs and 30 percent construction
documents based on a previous visioning master plan
created by Greenways, Inc. The new Miami River
Greenway will serve as a pedestrian linkage for the many
communities along the river to the downtown, Kimley-Horn
developed typical cross sections and plan view graphics
that incorporate important urban design elements along
the greenway such as wayfinding signage, mini-parks,
canopy coverage for shade, and public art.
In addition to landscape architecture and urban planning,
Kimley-Horn provided civil engineering, roadway design,
and storm water retrofitting services for this project. With
these in-house capabilities, the design team was able to
produce high-quality 30 percent construction drawings for
the City within the anticipated timeframe. Building on these
efforts, the firm is now working with the City of Miami to
prepare design guidelines for the entire corridor that
establishes a set of standards for properties and segments
of the Miami River Greenway,
Client Reference:
Lavinia Freeman, Program Manager
Trust for Public Land
(305) 667-0409
Completed: Ongoing
Total Fees Paid to
Firm: $440,000
Total Cost of Design
and Construction,
Estimated and Actual:
$5 million
Project Duration: TBD
'!r:i
~ ~, )1..
lJ B G
~-n Kimley-Horn
IIIIl.....J _ U and Associates, Inc,
4.6
URBAN RESOURCE GROUP
lDlflS1GNOf_lloIlUf-ItO'"IIlD.l.tlOu.un,tIC
'..L, "'lfj;jjj ~ W , r
Professional Design Services for the
- -
H'ien....;.a.,: "f!:' , ~'l'd ~~. ~~< .~~". L
: ill: ' -~ l.J...uJJ-lU d' ,=- - ~ G~~
_ _. _ _ _ .' ,. ; iatt, , ~
""'--." .. ~~ ~ "'-...-.
...;.1- ....~;!~ '...~
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
(
~
~7
~
.---,
Royal Oaks Park - Miami lakes, FL
The Town of Miami Lakes has utilized Kimley-Horn as
Town Engineer since its incorporation in 2000, As Town
Engineer, Kimley-Horn has been responsible for master
planning, public involvement, and the design and
construction of Royal Oaks Park. This park, which is the
largest public works project ever undertaken by the Town,
consists of a 20-acre sports complex focusing on soccer
and football. Phase one consists of four lighted
soccer/football fields, a concession/restroom building,
public utilities, parking, perimeter berm, fencing,
landscaping, irrigation, and a tot lot. Phase two includes a
community center, jogging trail, additional parking, and
landscaping.
Kimley-Horn worked with the Town through the initial
public involvement phase to conceptually plan Royal Oaks
Park, as well as other parks within the community. From
this public involvement process, we developed a master
plan, created a design/criteria package, and assisted the
Town in the process of selecting a contractor to build the
facility, which opened in April of 2005.
Client Reference:
Alex Rey, Town Manager
Town of Miami Lakes
(305) 558-8244
Completed: 2005 (Phase I)
Total Fees Paid to Firm: $35,623
Total Cost of Design and Construction, Estimated and
Actual: $3 million (Phase I)
Project Duration: 2 years
0,."..,,1
J"...n..l 'IUm,L,~,.
R,".lu.l.. r,,~
if$ ,_,.:::
UZ290066.07-Q Heritage Park & Parking Garage.qxp
192007 Kimley.Horn and Associates. Inc.
I ,,.. ,'i~ ..1tJ!iii'1
laishley Park - Punta Garda, FL
Laishley Park is an approximately 15-acre site located just
north of downtown Punta Gorda along the Peace River,
The project includes a park, pedestrian promenade along
the Peace River, streetscaping, landscaping, irrigation,
vehicle and boat trailer parking, and other site features
such as a carousel, farmers' market open-air pavilions,
open-air performance space, interactive water fountain,
and opportunities to display public art.
Client Reference:
Randy Brodersen, Project Manager
City of Punta Gorda Public Works
Phone: (941) 575-5064
Completed: Phase 1 - 2005
Total Fees Paid to Firm: $86,000
Total Cost of Design and Construction, Estimated and
Actual: N/A
Project Duration: 2 years
\..... , ..;>
.1 :~"': '.: 1;,1\-1....... .
J ~~ -," __ -'~~"",, \.';':~::."'.
~ t'~ :::. =~.~~. J-~b... .....!~
! to j -= ~> . -'-.::~; =;r-~r:" (I' ........
~ ~'Ga~::'i'...J" ..~
..-.-"",-~.r~~~~ .J'
t.'-,-'~M~-i ~~""",~' ~- . it
. * n...;- ,!8-@ ~,~, ~", ~J 1-..
....... w' r .. .. .ca-'" '....-< :I .
s f.'ool3'.~a."i..
".... '. .J ........, ....SoI"~
.. :.. ~..a.. .. it
.. ~~..-.. oJ'.. ·
" .. .........., ~:
.. .....
: .... ~
Lai.l1ley Park
IlIlJor;lrdth,~ !\:~.t"If'r PI..n
~I
~"~'~_~r~""::(;(~~l,~~ ~.
U I~ G
~-n Kimley-Horn
~_U and Associates, Inc,
4-7
URBAN RESOURCE GROUP
AOIYISIOItOfkl!'ll,fY,140RIIAllOUSOU.lTFI,IJt{
eorl...II'l1rl
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. UZ290066.07-0 Heritage Park & Parking Garage,qxp
@'lOOT Kimley.Horn and Associates. Inc.
.
.
~.,. ~
Professional Design Services for the
n- --ier., I~;, -a-, i,' i '~-~-L'~ ~ ;,'-'-,-:;f~' -.~ ".,
. III r ., - l' ~ ~ -d-~.tiind'G'
__: ..'." - _ ~ . .iII'-_.l:QI~Ilt'
...-; ,:;;:::::-- ....~ --.-. . I
---'. ~-;" ,--
~w
or
+
i
tti.7
,
.;;:
Oak Street Park -
Wauchula, FL
This is an active park with various
recreational amenities including
tennis, basketball, and racquetball
courts, as well as a children's
playground. Services include
master planning and the
preparation of construction
documents.
Client Reference:
Jerry Conerly, City Administrator
City of Wauchula
Phone: (941) 773-3535
Completed: 2006
. ",.. ....,,, --- r' Total Fees Paid to Firm: $50 000
.,',..",.....,"~ ,
;;;.;:;.~ Total Cost of Design and
Construction, Estimated and Actual: $345,209.75
Project Duration: 1 year
Royal Park Bridge, Bridgehead Design - West
Palm Beach, FL
During the planning and design of the new $50 million
Royal Park Bridge connecting the historic Town of Palm
Beach with the City of West Palm Beach, Kimley-Horn
faced many challenges in creating a gateway to these two
great cities. An important achievement in this project was
facilitating consensus among a complex group of
stakeholders, including the Town of Palm Beach, the City
of West Palm Beach, the design commission for downtown
West Palm Beach, FDOT, and the general public. Kimley-
Horn worked with these stakeholders to design two parks
on each side of the bridge, with the aim of integrating the
structure into the fabric of the two communities. A key
component of this project is a multiuse, 24-foot
recreational path on the West Palm Beach side of the
bridge. This path allows pedestrians and cyclists to travel
safely beneath the arched main bridge without having to
navigate through the busy roadway above, To further
integrate the bridge into the existing area, more than a
dozen 50 to 100-foot specimen canopy trees were floated
on a barge to the site and crane-lifted into place.
.~.
-.....e.t. ,',
...,...,.1'
-
Client Reference:
Joe Borello, 15/95 Corridor Manager
FDOT District Four
Phone: (954) 777-4426
Completed: Design 2003/Construction 2006
Total Fees Paid to Firm: $5 million
Total Cost of Design and Construction, Estimated and
Actual: $50.8 million
Project Duration: 4 years
I .fTn
-=- ~ -::G --
I
.d~:-~--,. .
"'-?
:;~~~-
~~~
~clJ~
--,
.i
i . .!.....~(,..,.,)
,I 1-~""",,roT""''''::''''A'd'''
~ -~"",""W-l-'",!iJII'r,pf'C
~inlll'!I-II(I"" ..Il':io;tJ1Il.J IICU park::: III >d(1, :::;)e III 1\\llltl/ I{'f.!
nn..l,,(., lei/II tI,,-, Ilin! of illt '''''(11;11., till' ~(rll 'Iurt' il1lo tiT,'
/;,I,,.i, ,,( 1,,,11, tI/" /""" ,,( 1:,/," n, ".// '" I tI". ('illl'/ II ,_I
I ~/J'l l:l'dl.J, .
Projects done in the area by Kobi Karp
Architecture and Interior Design include:
~ Meridian Condo Hotel
.:I Sunny Isles Beach Marina Condominiums
:I St. Tropez Condominiums
lJ I~ G
.......-J_ n Kimley-Horn
~_ U and Associates, Inc,
4-8
URBAN RESOURCE GROUP
. /)1lI11/)1I Of Il~ln,MO.1l AIID USO<UTH, IN(
~_ '=;: _ ~ ~ ;.' }l
"~-!:::: ~ - ~#
" -:= -'.. :.. ;"'i.::-~/ _ c:-;;;
- , ~_.. -...-
- ... ' ..~.:
-r~"'-:::.;,
.. ~~;.-::::.~ ~
~ '~~~ e'jA
- - ~~ .~
"" . -::. '~''C: _.
_ - f ~::-
(T~~
:::- ~:::;,...
'- ' -
~ ~..- --=
.
:~""
~_. ~ -
~",~
. .~~
.;.;=-.-: -
..,~-~ ~ ~
~-s- _ ~
...t~~ ~~~~ - ~ _ --'
.- - ............--.- Q... ~
.~~ "p,:'i:~- ~::; , - "'"
~- =-- --
-= ~--- ""':
J'.. -~:IIIii::=.~_ ~ --~ -~ -
-.::=.;~...;.;........ ~;;..;..-
'~~,,::--r::;. ~-,: - -
~-~~~~F~~-;:-"~_ ~:= _
i~ " --, ~:;: ~ -=,-':':; - = -
.=-=--EE:== ;;:;- ~~~;.-~ ~ 7? -
;:-.~- ~ -~ -==-~ g~-..
~ ~~-:~A ~e= ==.... ~
~ ~ ... !!-~ - -
4 '"
.
~
.
I
.
I
.
I
.
I
.
I
.
z~ ~ ...ri-4~~ml~!~,/tJT~Il~;
.....;..~~:.II" ~~ ~ ~--: ~
.'. 7, ..:c:;.."", ~-'. ~
~ _ _ ::~~.~-' ~J ~
l":-~"- -
.- .........,.~-~-
~~ - '..~ ;.--.-..
r'.r:'-~' "
I '
. ", I
.... - ~
,
~ '
~.i"-'
'\ "1
~
1
l
Professional Design Services for the
Be,rita e
ad Parking Garage
I I' 1 I ·
I _ I ~ '\
I ~ r I ,
~ . 1
.
_ _L
. Sf 330
. 'UBIIC ENTITY (RIME STATEMENT
. NON-(OlIUSIVE IfflDAVIT
. FLORIDA BUSINESS liCENSES
RFO No. 07-08-01
~=~
Kimley-Horn and Associates, Inc.
lJ H G
URBAN RESOURCE GROUP
.. DI"SIO" Of IlIMLE'.....O.. 'NO AUOCI1TU, 111(.
UZ290066.07-O Heritage Park & Parking Garage.qxp
@2007 Kimley-Horn and Associates, Inc.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
I:
.
.
.
ARCHITECT - ENGINEER QUALIFICATIONS
PART 1- CONTRACT SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (Clly and State)
Sunny Isles Beach Heritage Park Design
2. PUBLIC NOTICE DATE
September 2007
3. SOLICITATION OR PROJECT NUMBER
07-08-01
B. ARCHITECT - ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Jack M. Perry, Project Manager / Sr. Landscape Architect
5. NAME OF FIRM
Kimley-Horn and Associates, Inc.
6. TELEPHONE NUMBER
305-535-7711
7. FAX NUMBER
305-673-4882
8. E.MAIL ADDRESS
Jack. Perry@kimley-horn.com
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)
(Check)
cr: 'cr:
w w Zo 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
:2 >Z Of-
ii: ,f- Uu
--'cr: gJ~
0.. <(
0.. C/lf-
Kimley-Horn and Associates, Inc. 1691 Michigan Ave., Suite 400 Project management, park
a. X Miami Beach, FL 33139 planning, landscape
architecture, civil engineering
rXl CHECK IF BRANCH OFFICE
Kimley-Horn and Associates, Inc. 4431 Embarcadero Dr. Parking deck structural
b. X West Palm Beach, FL 33407 engineering.
landscape architecture
rXl CHECK IF BRANCH OFFICE
Kimley-Horn and Associates, Inc. 5200 NW 33rd Ave., Suite 109 Landscape architecture, traffic
c. X Fort Lauderdale, FL 33309 engineering
rXl CHECK IF BRANCH OFFICE
Kimley-Horn and Associates, Inc. 2601 Cattlemen Rd., Suite 500 Landscape architecture
d. X Sarasota, FL 34232
rXl CHECK IF BRANCH OFFICE
Kimley-Horn and Associates, Inc. 3001 Weston Pkwy. (Cary 27513- Parking deck structural
2301) engineering
e. X P.O. Box 33068
Raleigh, NC 27636-3068
r 1 CHECK IF BRANCH OFFICE
Kimley-Horn and Associates, Inc. 10521 S.W. Village Center Dr., Suite Environmental
f. X 103
Port St. Lucie, FL 34987
rXl CHECK IF BRANCH OFFICE
Kimley-Horn and Associates, Inc. 9130 S. Dadeland Blvd., Suite 102 Roadway/MOT
g. X Miami, FL 33156
rXl CHECK IF BRANCH OFFICE
Bureau Veritas North America, Inc. 10125 NW 116th Way. Suite 18 Geotechnical Engineer
h. X Miami, FL 33178
rXl CHECK IF BRANCH OFFICE
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Communikatz, Inc. 4141 NE Second Avenue, #1010 Public Involvement
i. X Miami, FL 33137
r 1 CHECK IF BRANCH OFFICE
Franyie Engineers, Inc. 10610 N.w. 27 St. MEP
j. X Miami, FL 33172
r ] CHECK IF BRANCH OFFICE
30-40 Front Street GraphicslWayfinding
k. X Guidance Group Building 6L, 2nd Floor
PO Box 51086
r 1 CHECK IF BRANCH OFFICE Indian Orchard, MA 01151
5500 N.W. 22nd Avenue Water Feature Design
I. X Hall Fountains, Inc. Fort Lauderdale, FL 33309
r ] CHECK IF BRANCH OFFICE
2915 Biscayne Ste 200 Architecture
Kobi Karp Architecture and Interior Miami, FL 33137-4197
m. X Design
r 1 CHECK IF BRANCH OFFICE
2601 South Bayshore Drive, Suite Lighting Design and
O'Brien Lighting, Inc. 245, Miami, FL 33133 Consultation
n. X
r 1 CHECK IF BRANCH OFFICE
X Schwebke-Shiskin & Associates, Inc 3240 Corporate Way Surveying Services
o. Miramar, Florida 33025
r 1 CHECK IF BRANCH OFFICE
URBANOMICS, Inc. 13000 Sawgrass Village Cir, Ste 38 Financial Analysis
p. X Ponte Vedra Beach, Florida 32082
[ ] CHECK IF BRANCH OFFICE
Sweeney & Associates, Inc. 38730 Sky Canyon Drive, Suite C Irrigation Services
q. X Murrieta, CA 92563
[ ] CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM
[X] (Attached)
~
J ~5
~~ '
~ ~~
Q) __, :5il c:i
-:E ,. ~~
lo...... ~'". ~ li:
..Q u. =-
en
~.~,~1
~=
O)~
8'_
co ....
.~.~
~='
e
c....
,
--
cJ
c:
gf
E:ffi
OU
IO
,en
~~
E"'C
szf6
~
II
~
-
c:;
~
...
'E
CI
u
en
~
...
CI
-
-
c
II)
~
E
E
CI
u
?fl.
-
...
o
.c
'"
o
o
'"
N
N
::l
.
.
.
.
.
.
.
.
'.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Jack Perry, RLA, ASLA
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke
13. ROLE IN THIS CONTRACT
Project Manager
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
26 2
15. FIRM NAME AND LOCATION (CIty and State)
Kimley-Horn and Associates, Inc., Miami Beach, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science / Landscape Architecture
Master / Design Studies - Real Estate Development
17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND D/SCIPLlNE)
CA / CLA
MD / CLA
FL / RLA
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards, etc)
More than 25 years of diverse experience in landscape architecture and urban design; extensive experience in the fields of new
town planning and resort development, facility design management, architectural conceptualization, and construction; proven ability
to conceive, design, and manage complex projects, reaching optimal results with respect to budget, schedule, aesthetic concerns.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
RiverFront and Water Front Park PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Miami, FL
(3) BRIEF DESCRIPTION (Brief scope. sIze. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
a.
As part of the renaissance taking place along the Miami River, this 11-acre site will include six high-rise towers with 3,000 luxury condominiums and more than
100,000 square feet of retail space, all connected by pedestrian plazas and covered arcades. The area will also include 10 water features and more than 1.000
linear feet of riverfront improvements. which were guided by the Greenway Regulatory Enhancement Program written by Kimley-Horn's Urban Resource Group
(URG) and adopted by the City of Miami. As project manager. responsible for the site planning. landscape architecture, and street and amenity lighting. as well as
signage and wayfinding systems. Cost: $6 million.
(1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED
Omni Development PROFESSIONAL SERVICES I CONSTRUCTION (If ApplIcable)
Miami, FL
(3) BRIEF DESCRIPTION (Bnef scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
b. Project manager for redevelopment of this 11.3-acre site adjacent to Miami's Carnival Center for the Performing Arts. Composed of six, 58-65 story residential
towers offering 4,200 dwelling units and 350,000 square feet of retail. this site is poised to become the area's major retail/residential center. Responsibilities
included master planning. urban design concepts. landscape architecture, and coordination with the Florida Department of Transportation and the city on a year
long and ultimately unanimous public approvals process. Also worked with the city and the Omni CRA to re-establish the city's street grid. This plan divides the
existing super block into three smaller blocks with NE 16th and 17th Streets once again linking Biscayne Boulevard to Margaret Pace Park and the proposed
Baywalk. The new section of NE 17th Street will become an enhanced pedestrian/auto retail corridor with outdoor spaces for gatherings. Cost: $8.5 million.
(1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED
Florida City Center PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Miami, FL
(3) BRIEF DESCRIPTION (Brief scope. sIZe. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
c.
Project manager for the Kimley-Horn team. Situated between Miami and Key Largo, this 990-acre site will support a mixed-use residential community that is self
sustaining and will also serve as an enhanced gateway to the Florida Keys. The plan proposes up to 6,000 single-family homes and multifamily units. almost
400,000 square feet of office/retail, a K-8 and local high school, and a hotel. Responsibilities include supporting the DRI team of planners, environmentalists, legal
advisors, traffic and civil engineers; strategic master planning; site planning and landscape architecture for the project's roadways, 140-acre town center, and more
than 60 acres of parks; presenting to the client team, public workshops, and governmental agencies. Cost: $201.840.
(1) TITLE AND LOCATION (Clly and State) (2) YEAR COMPLETED
Empire World Towers PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Miami, FL
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Empire World Towers will be the tallest towers and condominiums in Miami, consisting of two oval 95-story buildings located on a two-acre parcel. The entire
complex will contain close to 2,000 residential condominiums and more than 960.000 square feet of parking space and 62,000 square feet of commercial and office
space. Mr. Perry's role includes landscape architecture and urban design of the ground floor and upper-level amenity decks. as well as managing vehicle access
and traffic analysis and civil engineering portions of the project. Mr. Perry is also responsible for managing the preparation of the Major Use Special Permit (MUSP)
documents. Cost: $44,460.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
1400 Biscayne Boulevard PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Miami, FL 2006
(3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
e.
As senior project manager, partnered with a world-renowned architecture firm and with the City of Miami's Omni Community Redevelopment Authority (CRA) on this
major retaillresidential center. Appropriately named for its location, 1400 Biscayne Boulevard will offer 850 dwelling units and 44.000 square feet of retail.
Responsibilities included concept design and landscape architecture services. Cost: $30,000 (for a MUSP).
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Jerry Ingram, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke
13. ROLE IN THIS CONTRACT
Principal-in-Charge
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
40 29
15. FIRM NAME AND LOCATION (City and State)
Kimley-Horn and Associates. Inc., West Palm Beach, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science / Civil Engineering
Master of Science / Transportation Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
FL / P.E.
CA / P.E.
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards. etc.)
Thirty-three years of transportation engineering experience; served as principal-in-charge and/or quality control advisor on a range
of traffic engineering and traffic control system projects, including many of the most innovative systems in the U.S.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SW Capital Circle PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Tallahassee,FL
(3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
a.
Principal-in-charge of the Kimley-Horn team performing a PD&E study for Capital Circle Southwest from Blountstown Highway to Crawfordville Highway. The goal
of the project is to ensure that the transportation improvements also incorporate regional stormwater solutions. incorporate greenways, protect and enhance the
natural environment. include aesthetic enhancements, and seek opportunities to include recreation improvements. Services include data collection. traffic analysis,
and meetings with local. state, and federal reviewers. Public involvement services involve working with a wide cross-section of community stakeholders and
technical experts, and creation of multiple newsletters discussing project elements. Cost: $2.7 million.
(1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
SunPass Challenge Projects PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Florida's Turnpike Enterprise 2003
b. (3) BRIEF DESCRIPTION (Briefscope. SIZe, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Served as principal-in-charge for this fast-track contract that includes retrofitting toll plazas on the Turnpike's southern system in Miami-Dade, Broward, and Palm
Beach counties. Our services include preparing contract plans and specifications. Cost: TBD.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Turnpike Mainline Widening from North of Sunrise Blvd. to Atlantic PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Blvd. 2004
Broward County, FL
c. (3) BRIEF DESCRIPTION (Brief scope, size, cosl. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Principal-in-charge for combined PD&E and design project widening 6.5 miles of Florida's Turnpike Mainline from six lanes to eight lanes. The project includes
major reconstruction of the Turnpike interchange at Commercial Boulevard. Project also includes widening of three existing Turnpike mainline bridges and
reconstruction of two bridges over the Cypress Creek mainline toll plaza. Cost: $82 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Turnpike Widening from HEFT to Johnson Street PD&E Study and PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Design
Broward County, FL
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Principal-in-charge for the Kimley-Horn team performing simultaneous PD&E and design services to widen Florida's Turnpike Mainline from Homestead Extension
of Florida's Turnpike (HEFT) to just north of Johnson Street in Broward County. Cost: $7.9 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Turnpike Mainline Widening from Lake Worth to Jupiter, PD&E PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Study and Design
Palm Beach County, FL
e. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Principal-in-charge for the PD&E study to consider the widening of more than 22 miles of the Turnpike in Palm Beach County. Cost: $1,271,545.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Chris Barton, RLA, ASLA
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Park Planning
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
30 2
15. FIRM NAME AND LOCATION (City and State)
Kimley-Horn and Associates, Inc., Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
Master of Landscape Architecture
Bachelor of Landscape Architecture
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FL I L.A.
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards. etc.)
Nearly 30 years of diverse experience in progressively responsible planning, design, management, and marketing of land
development services; educational background in landscape architecture, urban design, and regional planning.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (CUy and State) (2) YEAR COMPLETED
SR 7 Livable Communities Corridor Study PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami Gardens, FL
(3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
a.
Member of the Kimley-Horn team retained by the City of Miami Gardens to conduct the SR 7 Livable Communities Corridor Study. which is a partnership between
the City and FOOT. The firm's services included a multimodal analysis of existing transportation conditions; developing corridor mobility goals; conducting public
outreach activities; and developing an improvement plan that seeks to balance the needs of residents. businesses, and other corridor stakeholders with FOOT's
goal of maintaining the mobility function of SR 7. Cost: $70,000.
(1) TITLE AND LOCATION (CUy and State) (2) YEAR COMPLETED
Ansin Park Master Plan PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miramar, FL 2006
b. (3) BRIEF DESCRIPTION (Brief scope, size. cosl. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
As senior landscape architect and planner, helped develop a master plan and detail design for Ansin Park. a 33-acre area sports complex for the City of Miramar.
Also provided planning and design services to private sector land development clients. Cost: $7 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Professional Landscape Architectural Services PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Palmetto Bay, FL
c. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Recently selected by Palmetto Bay to update their parks facility master plan and implement specific parks, open space, neighborhood landscape projects, and other
landscape architecture-related projects. Cost: TBD.
(1) TITLE AND LOCATION (CUy and State) (2) YEAR COMPLETED
Broward County Convention Center Master Plan, DRI Analysis PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Fort Lauderdale, FL
d. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Principal planner for the review of all past and existing Development Order approvals. entitlements, and amendments for the Northport/Broward County Convention
Center Development of Regional Impact. The study involved a review of all official actions over the twenty year life of the DRI in preparation for the development of
a new master plan and expansion of the 1.2 million s.f. and 1.000-room hotel facility. Cost: Phase I $28, 000; Phase II $44,000.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Orion Resort PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Fort Lauderdale, FL 2006
e. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Principal planner in all entitlement efforts and permitting for the development of a 340-unit. luxury resort hotel on Fort Lauderdale Beach. Directed landscape
architectural design efforts for all streetscape and amenity areas. Cost: $34.500.
.
.
.
.
.
.
.
.
.
.
.
.
'.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Jonathan Haigh, RLA, ASLA
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke
13. ROLE IN THIS CONTRACT
Park Planning
14. YEARS EXPERIENCE
a. TOTAL b, WITH CURRENT FIRM
12 3
15. FIRM NAME AND LOCATION (City and State)
Kimley-Horn and Associates, Inc., West Palm Beach, FL
16. EDUCATION (DEGREE AND SPECIALlZA T/ON)
Bachelor of Landscape Architecture
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FL/L.A.
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizalions. Traming. Awards. etc)
Experienced project manager with nearly twelve years of landscape architectural experience. Specific design expertise in
greenways and trails, active and passive parks, and parks master planning.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Wilson Community Center, Pool, and Park Complex PROFESSIONAL SERVICES CONSTRUCTION (tf Applicable)
Boynton Beach, FL 2006
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Landscape architect for the Kimley-Horn team that served in the preparation of construction documents for Wilson Center. Pool, and Park Complex in Boynton
Beach. Improvements include upgrades to the existing aquatic facility, a new 12,000 sq. ft. community recreation center, two new outdoor basketball courts, a new
playground area with a tot lot and restroom facilities, an open multi-purpose grassed play field as well as parking, drainage. and utilities. Cost: $4.8 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Tampa General Hospital Expansion PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Tampa, FL 2005
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Lead landscape architect providing construction drawing and detail design services for a linear park along the Seddon Channel in downtown Tampa. The project
consists of a concrete paver walkway with a series of tensile fabric shade structures, a modern fire lane turnaroundlpublic park space, a plan for a decorative rock
installation under a new parking structure, and several other common area hardscape and landscape features. This project will clean up the hospital's "face" to the
public channel side view. This park part of Marjorie Park. Cost: $20.000.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Sugar Sand Park Carousel PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Boca Raton, FL 2005
c. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Landscape architect for the Kimley-Horn team responsible for the development of Phase IV of Sugar Sand Park, including site planning. environmental permitting,
civil. landscape, and architectural design. The first design package was for civil, electrical, landscape. and hardscape improvements for installation of a carousel.
Cost: $1.1 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Seaview Tennis Center PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Palm Beach, FL
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Landscape architect for the redevelopment of this tennis facility in the Town of Palm Beach. Project includes converting eight existing courts to clay with
subterranean irrigation systems as well as the design of new fencing. lighting, and additional storage facilities. Cost: $1.3 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
IslandWalk at the West Villages PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
North Port, FL
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Lead landscape architect providing landscape design services for entry features, perimeter buffers. residential units, lakeside plantings, and street tree plantings.
This project incorporates multiple phases of construction drawings. Cost: $2.5 (contract value to date).
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
James Pankonin, RLA, ASLA
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com Jete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Landscape Architect
14. YEARS EXPERIENCE
a, TOTAL b, WITH CURRENT FIRM
3 3
15. FIRM NAME AND LOCATION (City and State)
Kimley-Horn and Associates, Inc., Sarasota, FL
16. EDUCATION (DEGREE AND SPECIALlZA TION)
Bachelor of Landscape Architecture
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FL / RLA
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Trainmg. Awards. etc.)
Experienced in preparation of presentation graphics, site planning, hardscape design and custom detailing, task management, and
construction document preparation.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
The Bridges PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Venice, FL
a. (3) BRIEF DESCRIPTION (Briefscope. size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Provided supporting landscape architectural services for this groundbreaking project. The Bridges is a 146-acre, mixed-use community in Venice. Florida, that will
include workforce as well as market-rate housing. Our services include entitlement planning, site civil engineering. traffic analysis, landscape architecture. green
development assistance, and project coordination assistance. Cost: $ 416,500.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
West Villages Improvement District PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
North Port, FL
b. (3) BRIEF DESCRIPTION (Briefscope. size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Landscape architect for the Kimley-Horn team recently selected to provide engineering services on an "as-needed" basis for the West Villages Improvement District.
The District encompasses approximately 8.000 acres of land in the City of North Port. Other services to be provided include engineering andlor environmental
studies; permitting; required annual reports, public facility reports, and other related reports; design; construction phase services; and coordination with
governmental agencies. Cost: $26 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Pulte Homes - The Isles at Cay Commons PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Orlando, FL
c. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Served as landscape analyst for this project. Cost: $1.7 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
North Collier Boulevard Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Marco Island, FL 2005
d. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Provided supporting landscape architectural services to improve the streetscape of this road leading into Marco Island. The scope of work included landscape and
hardscape design. and construction phase services. Cost: $965.548.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Gran Paradiso PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
North Port, FL
e. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Provided supporting landscape architectural services. including custom detailing, hardscape and paving design, landscape design, presentation graphics. and
construction document preparation. Assisted the lead landscape architect in task management and workflow scheduling; assisted with construction phase services
during landscape installation, as well as the selection of materials and coordination with manufacturers. Cost: $1.910,500. Phase I construction cost:
$26.200.563.15. Phase I construction scheduled for early 2008.
.
.
'.
!.
.
.
.
.
.
.
.
.
.
.
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Jimmy Bellamy
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Landscape Architect
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
1 1
15. FIRM NAME AND LOCATION (City and State)
Kimley-Horn and Associates, Inc., Miami Beach, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science
Master of Landscape Architecture
17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Pubilca/lons, Organizations. Training. Awards, elc.)
Experience with organization and production of complex urban design and landscape architectural projects as well as graphic
production for presentations using CADD, Photoshop, PowerPoint, Illustrator, and Sketch-up.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
eRA Design/Build Consultant - Lakefront Redevelopment PROFESSIONAL SERVICES CONSTRUCTION (It Appilcable)
Kissimmee, FL
(3) BRIEF DESCRIPTION (Brief scope. SIZe, cost, elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
a.
Team member on the Kimley-Horn team selected as part of a design/build team to provide planning/design and permitting for the Kissimmee CRA. We will be
working with the CRA to redevelop a waterfront park, the streets within the CRA. and upgrade the utilities within the area. This project is starting with the planning of
the proposed improvements. KHA will design and permit all improvements in the CRA and Burkhardt Construction will construct the improvements. Cost $100
million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Alger Farms Residential Development PROFESSIONAL SERVICES CONSTRUCTION (If Appilcable)
Homestead, FL 2006
(3) BRIEF DESCRIPTION (Bnef scope. size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
b. Landscape production manager for the Kimley-Horn team who, on behalf of Mercedes Homes. Inc.. performed a due diligence investigation for a 77.8-acre,
agricultural-zoned property in the City of Homestead. Kimley-Horn performed land planning services in order to prepare the preliminary site plan for a 494-unit
Planned Unit Development (PUD). Kimley-Horn submitted the preliminary site plan and obtained approval from the City of Homestead, which is the first step in the
PUD approval process. The process included public meetings with the city's Development Review Committee. Planning and Zoning Board. and City Council. As a
condition to City Council approval, we were required to coordinate public meetings with residents from two different neighboring communities in order to reach
consensus about several aspects of the proposed development. The client subsequently retained Kimley-Horn to proceed with the next phase of the PUD planning
and approval process. Cost $20.000.
(1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
RiverFront PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami, FL
c. (3) BRIEF DESCRIPTION (Brief scope. size. cost, elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Landscape production manager responsible for project production, site planning. landscape architecture, and street and amenity lighting, as well as signage and
way-finding systems for this 11-acre site. As part of the renaissance taking place along the Miami River. this project will include six high-rise towers with 3,000
luxury condominiums and more than 100,000 square feet of retail space. all connected by pedestrian plazas and covered arcades. Additional amenities include ten
water features and more than 1,000 linear feet of riverfront improvements. The project follows the guidelines established by the Greenway Regulatory Enhancement
Program, which was written by Kimley-Horn's Urban Resource Group (URG) and adopted by the City of Miami. Cost $6 million.
(1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED
Empire World Towers PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami, FL
d. (3) BRIEF DESCRIPTION (Brief scope. size, cost. elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Empire World Towers will be the tallest lowers and condominiums in Miami, consisting of two oval 95-story buildings located on a two-acre parcel. The entire
complex will contain close to 2.000 residential condominiums and more than 960,000 square feet of parking space and 62.000 square feet of commercial and office
space. Mr. Bellamy's role includes landscape architecture production and urban design of the ground floor and upper-level amenity decks and for the preparation of
the Major Use Special Permit (MUSP) documents. Cost $44,460.
.
.
.
.
.
.
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Manny Arencibia, Jr., RLA, ASLA
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Landscape Architect
14. YEARS EXPERIENCE
a. TOTAL b, WITH CURRENT FIRM
4 4
15. FIRM NAME AND LOCATION (City and State)
Kimley-Horn and Associates, Inc., Miami Beach. FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Landscape Architecture
Associate of Arts / Landscape Architecture
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FL / RLA
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards. etc)
Experienced in a wide range of urban planning projects with special focus on corridor design and planning as well as coordinating
multidisciplinary design projects including landscape architecture, civil engineering, roadway design, electrical engineering, and
environmental engineering.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Midtown Miami and Related Parks PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami, FL
(3) BRIEF DESCRIPTION (Briel scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
a. Located in the heart of Miami, this 56-acre brownfield is the largest redevelopment project in the City of Miami. Currently serving as a designer and working with the
architectural design team to develop a truly urban mixed-use master plan that can support 4.500 residential units. 1.2 million square feet of commercial
development. offices, and parks. The design includes nearly 12.000 linear feet of urban streetscapes, a linear park system. an urban plaza, and a series of vest
pocket parks. Kimley-Horn authored streetscape design guidelines for the project and prepared a regional activity center justification report to increase DRI
thresholds. The firm is currently designing all public infrastructure including roadways. utilities. traffic, landscape, and urban design elements, as well as private
developments as they come on line. Cost: $26 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami River Greenway PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami, FL
b. (3) BRIEF DESCRIPTION (Bnel scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Involved in the creation of a greenway within the existing right-of-way owned by the City of Miami. Our team provided site civil services for paving, grading.
landscape architecture, construction plans. drainage plans, and permitting. Served as coordinator between the roadway engineer, civil engineer, landscape
architect. and lighting engineer. Cost: $5 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Omni Development PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami, FL
c. (3) BRIEF DESCRIPTION (Briel scope, size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Served as junior project manager and designer during the planning process of this redevelopment project. Working alongside the world-renowned architecture firm
Arquitectonica and the Omni CRA, Kimley-Horn is providing planning approval, site planning, urban design. civil engineering, and landscape architecture services
for this project. Omni consists of six, high-rise residential towers offering 4.200 dwelling units and 350,000 square feet of retail. Cost: $8.5 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
RiverFront and Water Front Park PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami, FL
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Task manager responsible for project production, site planning, landscape architecture. and street and amenity lighting, as well as signage and way-finding systems
for this 11-acre site. As part of the renaissance taking place along the Miami River, this project will include six high-rise towers with 3,000 luxury condominiums and
more than 100,000 square feet of retail space. all connected by pedestrian plazas and covered arcades. Additional amenities include ten water features and more
than 1,000 linear feet of riverfront improvements. The project follows the guidelines established by the Greenway Regulatory Enhancement Program, which was
written by Kimley-Horn's Urban Resource Group (URG) and adopted by the City of Miami. Cost: $6 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
The Meridian PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami Beach, FL 2005
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Served as construction administrator during the implementation of the landscape plans for this mid-rise luxury condominium property in South Beach.
Responsibilities included the selection of the plant material. inspection of the installation, and coordination with the owner, architects, general contractor. and
landscape contractor. Cost:$19.750.
,.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
-I
12. NAME
Fadi Khalil, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke
13. ROLE IN THIS CONTRACT
Civil Engineering
14. YEARS EXPERIENCE
a, TOTAL b, WITH CURRENT FIRM
8 0
15. FIRM NAME AND LOCATION (City and Slale)
Kimley-Horn and Associates, Inc., Miami Beach, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
Master of Science I Civil Engineering
Bachelor of Science I Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Mil P.E.
18. OTHER PROFESSIONAL QUALIFICATIONS (Publicalions. Organizallons. Training. Awards. etc)
More than eight years of diverse civil engineering experience with areas of expertise including land development. stormwater
management, and utility systems. Proficient in AutoCAD, AutoDesk Land Desktop, AutoDesk Civil Design and design analysis
software programs.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (CUy and Slale) (2) YEAR COMPLETED
Mondrian South Beach PROFESSIONAL SERVICES
Miami Beach, FL 2007
a. (3) BRIEF DESCRIPTION (Bnef scope. size. cosl. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Served as an analyst for the renovation of an existing structure. Tasks included redevelopment of pool deck and associated grading. design of a new drainage
systems, and preparation of construction documents. Cost: $134,430.
(1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED
Off Brickell PROFESSIONAL SERVICES CONSTRUCTION (If Appl1cable)
Miami, FL 2007
b. (3) BRIEF DESCRIPTION (Brief scope. size. cosl. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Project engineer, project consists of a hotel and office building including a parking structure and two stories retail area. currently in the permitting phase.
Responsibilities included due diligence level services during pre-development. Design a storm water system with drainage wells and exfiltration trenches, design of
a new water and sewer systems, paving. grading and offsite road design and permitting. Cost: $242,300.
(1) TITLE AND LOCATION (CUy and State) (2) YEAR COMPLETED
Marriott Hotel PROFESSIONAL SERVICES CONSTRUCTION (If Appl1cable)
Miami, FL
c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
Project engineer, project consists of demolishing existing buildings and construct two new buildings with new parking. Responsibilities included due diligence level
services during pre-development. Design a storm water system with exfiltration trenches, Onsite and Offsite water and sewer collection systems. paving. grading
and Drainage; onsite road design and permitting.
(1) TITLE AND LOCATION (CIty and Slale) (2) YEAR COMPLETED
French Landing Park PROFESSIONAL SERVICES CONSTRUCTION (If Appl1cable)
Van Buren Township, MI
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
Project manager. This was an existing park with deteriorating facilities and the project consists of adding new bathroom facility with septic fields, new park entrance,
new parking area, new hardscape and landscape areas, new playground area. Responsibilities included coordination and design. Design a septic system. Entrance
design. grading, water distribution system, and prepare bid documents and specifications.
(1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED
Van Buren Park PROFESSIONAL SERVICES CONSTRUCTION (If Appl1cable)
Van Buren Township, MI
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
Project manager. Project consisted of developing the old park area by adding new bathroom facilities, paved roads. handicap access to the adjacent lake. new
parking area. new maintenance building, new hardscape and landscape areas, new playground areas. Responsibilities included coordination and design, due
diligence level services during pre-development. Designed a stormwater system with open detention ponds, entrance design, paved roads design, grading. water
and sewer system. and prepare bid documents and specifications.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Walter Lugo, P .E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Civil Engineering
14. YEARS EXPERIENCE
a, TOTAL b. WITH CURRENT FIRM
8 8
15. FIRM NAME AND LOCATION (Clly and State)
Kimley-Horn and Associates, Inc., Miami Beach, FL
16. EDUCATION (DEGREE AND SPEC/ALlZA TlON)
Bachelor of Science / Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISC/PLlNE)
FL/ P.E.
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards. etc)
More than seven years of diverse civil engineering experience with areas of expertise including land development, stormwater
management, and utility systems. Proficient in AutoCAD and design analysis software programs.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Omni Development PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami, FL
a. (3) BRIEF DESCRIPTION (Bnef scope. size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project engineer for the Kimley-Horn team. With six, high-rise residential towers offering 4,200 dwelling units and 350,000 square feet of retail space, the 11.3-acre,
mixed-use Omni Development will reinvigorate the area. Responsibilities included due diligence level services during pre-development as well as the preparation of
a report on findings. This report included information pertaining to vehicular access, traffic, drainage, fire and flood protection. and the availability of public utilities
required to serve the Omni Development. A schedule of anticipated fees for the project was also compiled. Cost: $8.5 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Solei I PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami, FL
b. (3) BRIEF DESCRIPTION (Bnef scope, size, cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Serving as project manager for this high-rise mixed-use development currently in the permitting phase. Tasks include coordination and design; plan preparation and
quality control; on- and off-site water distribution and sanitary sewer collection systems; paving, grading, and drainage; on- and off-site roadway construction; and
permitting. Cost: TBD.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
The Lincoln PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami Beach, FL
c. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Served as project analyst responsible for site/civil permitting that included paving. grading and drainage, and water and sewer. The Lincoln is a multi-story, mixed-
use facility that includes 120,000 square feet of Class A office space, 38.500 square feet of retail space. and 719 parking spaces. Cost: $70,000.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
1400 Biscayne Boulevard PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami, FL 2006
d. (3) BRIEF DESCRIPTION (Bnef scope. sIZe. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project engineer for this project that features two high-rise residential towers offering 850 dwelling units and 44.000 square feet of retail space. Kimley-Horn is
providing planning approval. site planning, urban design. and landscape architecture services for this project. Kimley-Horn is also working closely with city and state
agencies on overall design integration into the Omni redevelopment plan. Total cost: $30,000 (for a MUSP).
(1) TITLE AND LOCATION (Clly and State) (2) YEAR COMPLETED
1-95 SunGuide Final Design PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
FDOT District Six 2001 2006
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Served as analyst for all site civil work on this six-acre site. Tasks included coordination and design; plan preparation and quality control; water distribution and
sanitary sewer collection systems; paving. grading, and drainage; onsite and offsite roadway reconstruction; and permitting. Total project cost: $50 million.
I-
-
I
.
-
.
-
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Dean Penny, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com tete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Parking Deck Structural Engineering
14. YEARS EXPERIENCE
a, TOTAL b, WITH CURRENT FIRM
24 23
15. FIRM NAME AND LOCATION (City and State)
Kimley-Horn and Associates, Inc., Raleigh, NC
16. EDUCATION (DEGREE AND SPECIALlZA nON)
Master of Science / Civil Engineering
Bachelor of Science / Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
AL / P.E. AR / P.E. AZ / P.E.
CA / P.E. FL / P.E. NC / P.E.
NV / P.E. SC / P.E. TN / P.E.
WV / P.E. VA / P.E. IN / P.E.
18. OTHER PROFESSIONAL QUALIFICATIONS (Publicalions. Organizations. Traimng. Awards. etc)
Offers 24 years of experience specializing in parking planning/design and structural engineering. His design and construction
projects have included structural steel, reinforced concrete, precast prestressed concrete, post-tensioned concrete, and timber on all
types of buildings, parking decks, and bridges
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED
Target Parking Deck PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Deerfield Beach, FL 2001
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project manager for the Kimley-Horn team that designed an adjacent two-level parking facility for Target. Precast concrete facades were detailed to match the
exterior facade of the new two-story Target. The design consists of one elevated parking level constructed of precast concrete and one at-grade parking level. all
within a footprint measuring 372 by 252 feet. The elevated precast concrete deck is supported by cast-in-place concrete foundations, while the lower-level parking
surface is a concrete slab-on-grade. From the deck's second level, a connecting pedestrian bridge provides access to the store. Precast concrete facades were
detailed to match the store's exterior facade. Cost: $3.25 million.
(1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED
Target Parking Deck PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Plantation, FL 2003
(3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
b. Project engineer on the Kimley-Horn team that provided engineering-related services for the design and construction of a 331-space, two-level (ground plus one
elevated level) parking deck alongside a proposed Target store in Plantation, Florida. The existing Target store on the site was demolished and a new store was
built. The elevated 244 by 227 foot parking deck features precast concrete construction on shallow foundations; the lower level consists of concrete slab-on-grade.
The upper level is accessed via an external express ramp. The deck has been designed to accommodate a potential future elevated level containing another 170
spaces. Functional design features include orienting the main elevator and stair towers to promote flow into a pedestrian plaza and providing cart storage below the
external express ramp. Cost: $4.5 million.
(1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED
Columbia Metropolitan Airport, Parking Structure Planning and PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Functional Design, SC 2003
c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project engineer on part of an AlE team. Kimley-Horn provided curbside analyses, parking demand analyses, functional planning, and circulation for a proposed
2.000-space parking garage to serve long- and short-term parkers. Services included alternative concept development, evaluation of staging during construction,
and providing input into the parking revenue control system. Cost: $24 million.
(1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED
North Carolina State University North Campus Parking Deck PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Raleigh, NC
d. (3) BRIEF DESCRIPTION (Bnef scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Principal-in-charge of the Kimley-Horn team retained by North Carolina State University to design a two-level, 400-space parking deck on the north campus. The
site. formerly the location of Riddick Stadium, has been used most recently as a surface parking lot. The ongoing rehabilitation, design. and construction of various
buildings on the north campus have created a demand for both new and replacement parking. This new deck will provide parking for campus visitors, as well as
limited staff parking. It also will be designed to accommodate future construction on top of the deck of a four-story building planned for academic use. Cost: $8.5
million.
(1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED
Raleigh Downtown Underground Parking Facility PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Raleigh, NC
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project manager on the Kimley-Horn team that is providing planning. design. and construction phase services for this gOO-space underground parking deck that will
serve the City of Raleigh's proposed new convention center and adjacent hotel. The deck, which will be located under the new hotel, will consist of three parking
levels below grade. Kimley-Horn was responsible for overall design and coordination with the designers of the convention center and hotel. Services provided by
Kimley-Horn include a parking feasibility analysis, structural design, parking consulting, traffic operations. civil engineering. landscape architecture, and overall
project coordination. Cost: $33 million.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Adam Cochran, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Parking Deck Structural Engineering
14. YEARS EXPERIENCE
a, TOTAL b. WITH CURRENT FIRM
8 8
15. FIRM NAME AND LOCATION (City and State)
Kimley-Horn and Associates, Inc., Raleigh, NC
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science I Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
NC I P.E. CA I P.E.
VA I P.E.
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Traming. Awards. etc)
Responsible for functional layout, structural design, production of plans and specifications, and construction phase services for
parking decks and bridges. His structural design projects have included reinforced concrete, precast prestressed concrete, and
structural steel post-tensioned concrete.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Target Parking Deck PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Deerfield Beach, FL 2001
a. (3) BRIEF DESCRIPTION (Brief scope. sIze. cosl. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project manager for the Kimley-Horn team that designed an adjacent two-level parking facility for Target. Precast concrete facades were detailed to match the
exterior facade of the new two-story Target. The design consists of one elevated parking level constructed of precast concrete and one at-grade parking level, all
within a footprint measuring 372 by 252 feet. The elevated precast concrete deck is supported by cast-in-place concrete foundations, while the lower-level parking
surface is a concrete slab-on-grade. From the deck's second level, a connecting pedestrian bridge provides access to the store. Precast concrete facades were
detailed to match the store's exterior facade. Cost: $3.25 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Target Parking Deck PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Plantation, FL 2003
(3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
b. Project engineer on the Kimley-Horn team that provided engineering-related services for the design and construction of a 331-space, two-level (ground plus one
elevated level) parking deck alongside a proposed Target store in Plantation, Florida. The existing Target store on the site was demolished and a new store was
built. The elevated 244 by 227 foot parking deck features precast concrete construction on shallow foundations; the lower level consists of concrete slab-on-grade.
The upper level is accessed via an external express ramp. The deck has been designed to accommodate a potential future elevated level containing another 170
spaces. Functional design features include orienting the main elevator and stair towers to promote flow into a pedestrian plaza and providing cart storage below the
external express ramp. Cost: $4.5 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
UNC-Chapel Hill, Jackson Circle Parking Deck PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Chapel Hill, NC 2005 2006
c. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Served as project manager. As a subconsultant to Pearce, Brinkley, Cease, and Lee, Kimley-Horn designed an 800-space parking structure for UNC-Chapel Hill.
The proposed parking deck will be located on Jackson Circle, adjacent to a planned medical office building near the intersection of New East Drive and Manning
Drive. The parking deck will help meet the parking needs of the University's hospital staff. Kimley-Horn's services for this project include a parking study;
environmental assessment; traffic, structural. and civil engineering; stormwater design; and landscape architecture. Cost: $18.9 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
North Carolina State University Coliseum Parking Deck Expansion PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Raleigh, NC 2002 2003
d. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project engineer for the Kimley-Horn team that designed this five-level, 1.100-space addition connected to the existing parking deck serving Reynolds Coliseum.
This expansion brings the total number of spaces available to 2,200. As prime consultant. Kimley-Horn was responsible for functional parking layout, traffic
engineering. structural design. site civil engineering. revenue control, landscape architecture. and an environmental assessment of the site. Cost: $7.2 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Market Street Parking Deck Rehabilitation PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Charlottesville, VA 2002 2002
e. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Task Manager. Kimley-Horn conducted a thorough review of the parking deck that involved visual nondestructive testing of all exposed structural framing and
electrical and mechanical systems. The results of this walk-through were documented in a report with recommendations for improvements and repairs. Based on
the results, the City selected several improvements. During preparation of these repair documents, the City also requested that we modify the first floor tenant
spaces to accommodate new lease arrangements and expand the tenant space to include additional retail units. The plans for this expansion have been completed
and improvements were implemented in 2002. Cost: $1.8 million.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Jamie Farnham, E.!.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Parking Deck Structural Engineering
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
4 4
15. FIRM NAME AND LOCATION (City and State)
Kimley-Horn and Associates, Inc., West Palm Beach, FL
16. EDUCATION (DEGREE AND SPECIALlZA nON)
Bachelor of Science / Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FL / E.1.
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards. etc.)
Engineering design software experience with MicroStation, GeoPak, GeoPak Bridge.
Bridge design software experience with RC Pier, GT Strudl, Merlin-Dash, Shoring Suite FDOT Software, ConS pan LA. and Win-
Descus I & II.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED
US 41 (Business)/SR 739 - South of Alico Road to Six Mile Cypress PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Parkway 2007
Lee County, FL
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
Responsible for structural modeling and design of 72" Florida Bulb- T and AASHTO Type IV prestressed girder dapped ends. Responsible for bulkhead and
retaining wall geometric layout and design as well as multiple bridge substructure designs. Cost: $1.1 million.
(1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED
Turnpike Mainline Widening from North of Sunrise Boulevard to PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Atlantic Boulevard 2004
Broward County, FL
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
As project analyst, responsible for bulkhead and retaining wall geometric layout and design. as well as multiple bridge substructure designs for this 6,5-mile
widening project in Broward County. This project is a fast paced combination of PD&E and design phases that includes the widening of the Florida's Turnpike from
six to eight lanes, three bridge widenings. two bridge replacements. and toll plaza modifications. Cost: $82 million.
(1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED
1-4 Widening from South of Kirkman Road to South of Orange PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Blossom Trail
Orlando, FL
c. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
Served as analyst and performed multiple bridge alternative studies, as well as development reports for nine new bridges and three widenings. This project includes
reconstruction of approximately 5.3 miles of the existing six-lane expressway to six general use lanes and two special use lanes. In addition, existing structures,
interchange ramps, and side roads will be modified to accommodate the proposed section. The interchange at Kirkman Road will be replaced with a partial access
multi-level directional interchange with one loop ramp. Within the project limits there are also interchanges with Republic Drive, Florida's Turnpike, Conroy Road,
and John Young Parkway. Cost: $5 million
(1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED
SR 739 over Alico Road/Seminole Gulf RR (US 41 Business) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
FOOT District One 2005
d. (3) BRIEF DESCRIPTION (Bnef scope. size, cost, elc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
Responsible for structural modeling and design of 72" Florida Bulb-T and AASHTO Type IV prestressed girder dapped ends. Responsible for bulkhead and
retaining wall geometric layout and design as well as multiple bridge substructure designs. Cost: $1.1 million.
(1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED
NW 25th Street Viaduct over NW 25th Street PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami-Dade County, FL
e. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
Responsible for multiple-span bridge geometric layout and design.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Ted Kendziora
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Environmental
14. YEARS EXPERIENCE
a, TOTAL b, WITH CURRENT FIRM
5 3
15. FIRM NAME AND LOCATION (CIty and Slate)
Kimley-Horn and Associates, Inc., Port St. Lucie, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science I Wildlife and Fisheries Biology
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (PublIcatIOns, Organizallons, Training. Awards. etc)
More than two years of experience of regulatory permitting for the Department of Environmental Resources Management (DERM),
Coastal Resources Section, Miami-Dade County, and coordinating environmental permits with the U.S. Army Corps of Engineers,
Florida Department of Environmental Protection, and the South Florida Water Management District. As well as more than three
years of experience of wildlife trapping, tagging, data collection, and relocation.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Boynton Beach CRA Mangrove Mitigation Monitoring PROFESSIONAL SERVICES CONSTRUCTION (/1 Applicable)
Boynton Beach, Fl 2006
(3) BRIEF DESCRIPTION (Briel scope, size, cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project manager for the Kimley-Horn team who was involved with the permitting for the expansion of Boynton Beach Boulevard and the Promenade. as well as
providing environmental services for the related impacts to natural resources associated with the project and the creation of tidal wetland mitigation area. As the
a. environmental scientists for the project, the firm obtained the required regulatory approvals for the multi-phased community redevelopment project by coordinating
with the SFWMD and USACE regarding wetland delineation and endangered and threatened species. seagrass surveys, WRAP analysis, and mitigation
requirements. Kimley-Horn assisted the Boynton Beach CRA with environmental services related to a mitigation area created at the Boynton Beach Boulevard
Extension and Promenade area and Jaycee Park. The firm assisted with information leading to the creation of the mitigation area and the monitoring requirements
throughout the project's history. Kimley-Horn's environmental staff documented and obtained enough information on the project to complete the phase zero
monitoring report and to keep in compliance with the current monitoring schedule. The project had its share of difficulties including numerous agency reviewers and
the 2004 hurricane season. The 2004 hurricane season resulted in disturbing the mitigation site at Jaycee Park and thus the planting requirements in the permit
were not consistent with the permit requirements. Kimley-Horn coordinated with SFWMD and USACE. Cost $14,500.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Sian PROFESSIONAL SERVICES
Hollywood,Fl 2006
b. (3) BRIEF DESCRIPTION (Briel scope. sIZe. cosl. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Served as analyst for the land development of this beach-side resort. Tasks included cut / fill calculations, impervious / pervious area calculations. and grading
analysis. Cost: $90,000.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Sunset Beach PROFESSIONAL SERVICES CONSTRUCTION (If ApplIcable)
St. Lucie County, Fl
c. (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Environmental scientist. Kimley-Horn prepared the ERP permit application and the Coastal Construction Control Line permit application for this single-family
residential oceanfront development. The firm is currently coordinating with the Florida Fish and Wildlife Conservation Commission, the U.S. Fish and Wildlife
Service, the U.S. Army Corps of Engineers, the National Marine Fisheries Service, and St. Lucie County. Kimley-Horn also prepared the Environmental Impact
Report and the Planned Unit Development package for St. Lucie County and are currently in the development review process. Cost: $550,660.
(1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
Flamingo, PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami Beach, Fl 2007
d. (3) BRIEF DESCRIPTION (Bnel scope. sIZe. cosl. etc) AND SPECIFIC ROLE [ ] Check if project performed with current firm
Conducted a marine resource assessment via SCUBA to identify regulated resources in Biscayne Bay Aquatic Preserve. Prepared a Marine Resource Assessment
Report to be submitted as part of the Environmental Resource Permitting process. Cost: $ $9,550 (sea grass survey).
(1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
Mondrian South Beach PROFESSIONAL SERVICES
Miami Beach, Fl 2007
e. (3) BRIEF DESCRIPTION (Bnelscope. Size, cost. elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Served as an analyst for the renovation of an existing structure. Tasks included redevelopment of pool deck and associated grading, design of a new drainage
systems, and preparation of construction documents. Cost: $134,430.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Burt Baldo, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
13. ROLE IN THIS CONTRACT
Roadway/Traffic/MOT
14. YEARS EXPERIENCE
a, TOTAL I b. WITH CURRENT FIRM
14 8
15. FIRM NAME AND LOCATION (City and State)
Kimley-Horn and Associates, Inc., Miami, FL
16. EDUCATION (DEGREE AND SPECIALlZA nON)
Bachelor of Science / Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND D/SCIPLlNE)
FL/ P.E.
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. OrganizatIons. Traming. Awards. etc)
More than 14 years experience in civil engineering with more than 12 years of extensive experience in the field of highway design,
drainage design, and traffic operations plans.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (Cdy and State) (2) YEAR COMPLETED
SR 80 from West of Haverhill Road to East of 1-95 PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
West Palm Beach, FL
a. (3) BRIEF DESCRIPTION (Bnefscope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Lead engineer/assistant project manager for team providing the complex engineering design services for SR 80 from west of Haverhill Road to east of Kirk Road.
The project was designed with eight lanes and a grade-separated interchange at Military Trail and Haverhill Road. Program included five bridges with retaining walls
and a 2,500-foot bulkhead along the north side of the C-51 Canal. Cost: $120 million.
(1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED
SW 216th Street from SW 127 Ave. to Florida's Turnpike PROFESSIONAL SERVICES CONSTRUCTION (If Applicabte)
Miami, FL
b. (3) BRIEF DESCRIPTION (Bnef scope, size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Project manager responsible for the master planning, public involvement, developing vertical and horizontal alignments, signing and pavement markings and
signalization plans for this 1.25-mile corridor. Also responsible for coordination for drainage design, which was performed by a subconsultant. Cost: $14 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
1-4 Widening from South of Kirkman Road to South of Orange PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Blossom Trail 2007
Orlando, FL
c. (3) BRIEF DESCRIPTION (Brief scope. sIze. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Project engineer responsible for the variation package, design of the super-elevation transitions, and the quality control of the horizontal and vertical alignments.
Services included 60 percent roadway plans. BDRs, and traffic operations plans. Project also included the design of two interchanges. Responsibilities included the
QC of the horizontal and vertical alignments. Designed the superelevation transitions. Also responsible for the variation package. Cost: $5 million
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 710/Beeline Highway Design (East and West) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Palm Beach County, FL
d. (3) BRIEF DESCRIPTION (Bnef scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Project manager for three new construction/widening projects. The combined length of all projects is 5.33 miles. Project manager for the design team provides major
highway design services. The western project (Project A) consists of the addition of two new lanes to provide a four-lane divided urban section along with the
replacement of the existing two-lane bridge and construction of a new two-lane parallel bridge. The eastern projects (Projects B and C) will provide a four-lane
divided urban highway. These projects include extensive right-of-way acquisition and coordination with local government. Cost: $29 million.
(1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED
Traffic Analysis for Nine Intersections PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami-Dade County, FL 2006
e. (3) BRIEF DESCRIPTION (Bnef scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Project manager for traffic operational analyses that were performed for MDPWD as part of the short-term traffic solutions effort for the County's list of congested
intersections. During the last quarter of 2005, the County issued a list of 25 intersections and suggested modifications to those intersections. Toward the end of the
year, the County assigned nine of the intersections to Kimley-Horn that were within FOOT right-of-way. The County asked that we perform traffic analyses and
confirm the suggested modifications within a month (a very accelerated schedule). We completed the task in January 2006 and held meetings with FOOT. who
approved the concepts. We also worked on the design of several of these intersections. Cost: $66.000.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Faisal Awan
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com Jete one Section E for each ke
13. ROLE IN THIS CONTRACT
Roadway/Traffic/MOT
14. YEARS EXPERIENCE
a, TOTAL b. WITH CURRENT FIRM
5 5
15. FIRM NAME AND LOCATION (CIty and State)
Kimley-Horn and Associates, Inc., Miami, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science / Civil Engineering
Master of Science / Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
NH / E.!.
18. OTHER PROFESSIONAL QUALIFICATIONS (PublicatIons. Organizations. Training. Awards, etc.)
Experienced in design and preparation of construction plans including roadway geometrics, cross sections, and drainage and
grading plans using Geopak and ASAD.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Turnpike Mainline Widening from North of Sunrise Boulevard to PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Atlantic Boulevard 2004
Broward County, FL
a. (3) BRIEF DESCRIPTION (Brief scope, size. cosl. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project included the reconstruction of Florida's Turnpike from North of Sunrise Boulevard to Atlantic Boulevard. Responsibilities included development of drainage
cross sections. ditch profiles, and various other drainage activities. Cost: $82 million.
(1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
Venetian Causeway Streetscape Master Plan PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami-Dade County, FL
b. (3) BRIEF DESCRIPTION (Bnef scope, sIze. cost. elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project engineer on the team responsible for the professional services, master planning and the preparation of complete plans for the beautification of the Historic
Venetian Causeway. Kimley-Horn was responsible for developing vertical and horizontal alignments, coordinating drainage design and signing and pavement
markings, landscape/hardscape/irrigation and signalization plans for this corridor. The project includes extensive coordination with the City of Miami and the City of
Miami Beach. It also required an involved public involvement program. Cost: TBD.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 710 (Beeline Highway) from Military Trail to Congress Avenue PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
(Project A)
Palm Beach County, FL
c.
(3) BRIEF DESCRIPTION (Brief scope, Size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Design engineer responsible for assisting in horizontal and vertical design of roadway, drainage design, and development of traffic control plans. The project
included the addition of two new lanes to provide a four-lane divided urban section as well as the removal of the existing two-lane bridge and the construction of a
new two-lane parallel bridge in its place. Cost: $29 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 710 (Beeline Highway) from West of Congress Avenue to West PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
of Australian Avenue (Project B)
Palm Beach County, FL
d.
(3) BRIEF DESCRIPTION (Brief scope, Size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Design engineer responsible for assisting in development of horizontal and vertical alignment of the roadway. The project consists of the addition of two new lanes
to provide a four-lane divided urban section. Cost: TBD.
(1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED
NE 2nd Avenue Reconstruction from NE 91st Street to NE 105th PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Street
Miami, FL
e. (3) BRIEF DESCRIPTION (Bnef scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Design engineer responsible for developing vertical and horizontal alignments, providing drainage design. signing and pavement markings. and signalization plans
for this corridor. The project included the reconstruction/widening of NE 2nd Avenue from NE 94th Street to NE 103rd Street, as well as areas of roadway milling
and resurfacing at the beginning and end of the project. The project also included a Joint Participation Agreement with the Village of Miami Shores, in which the
Village agreed to fund the streetscape and landscape improvements in order to participate in their design. Cost: $6 million.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Randall Blanchette
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
rComDlete one Section E for each kev Derson.)
13. ROLE IN THIS CONTRACT
Civil Engineering
14. YEARS EXPERIENCE
a. TOTAL I b. WITH CURRENT FIRM
1 1
15. FIRM NAME AND LOCATION (City and State)
Kimley-Horn and Associates, Inc., Miami Beach, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science I Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training. Awards. etc.)
Experienced in land development, utility services, stormwater management, preparation of design and construction documents, and
permitting.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Stormwater Master Plan PROFESSIONAL SERVICES CONSTRUCTION (tl Applicable)
Cutler, FL
(3) BRIEF DESCRIPTION (Bnel scope, SIZe, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
a.
Served as an analyst for the development of the stormwater utility rate structure for the Town of Cutler Bay. Tasks included field data collection, inspection of town's
drainage systems, basin analysis. and stormwater modeling. Cost: TBD.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Off Brickell PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami, FL 2007
b. (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Served as an analyst for the land development of a multi-story, mixed-use retail, hotel. and office structure with an underground parking garage. Tasks included
drainage analysis, utility coordination from building to public systems, and non-standard public right-of-way improvements. Cost: $242.300.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Mondrian South Beach PROFESSIONAL SERVICES CONSTRUCTION (If Appticable)
Miami Beach, FL 2007
c. (3) BRIEF DESCRIPTION (Bnelscope, sIze. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Served as an analyst for the renovation of an existing structure. Tasks included redevelopment of pool deck and associated grading, design of a new drainage
systems, and preparation of construction documents. Cost: $134,430.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Sian PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Hollywood,FL 2006
d. (3) BRIEF DESCRIPTION (Bnel scope, size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Served as analyst for the land development of this beach-side resort. Tasks included cut I fill calculations, impervious I pervious area calculations. and grading
analysis. Cost: $90,000.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami Children's Hospital Central Energy Plant Expansion PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami, FL
e. (3) BRIEF DESCRIPTION (Bnel scope. size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Served as an analyst for the site civil design of the expansion to the existing Central Energy Plant. Tasks included design of a new parking lot, drainage system,
and of electrical ducts running to and from the property. Cost: $61.500.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
John McWilliams, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lele one Section E for each ke
13. ROLE IN THIS CONTRACT
Traffic Engineering
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
7 7
15. FIRM NAME AND LOCATION (CIty and State)
Kimley-Horn and Associates, Inc., Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALlZA TlON)
Bachelor of Science / Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
FL / P.E.
18. OTHER PROFESSIONAL QUALIFICATIONS (PublIcations, Organizations, Training. Awards, etc.)
Has expertise in traffic operations and design, transportation planning, and highway design, IMSA Certification in Work Zone Safety
and Traffic Signal Technician Levell. Also proficient in AutoCAD R14, Microstation, Highway Capacity Software, Synchro, ART-
PLAN, HIGH-PLAN.
(1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED
Omni Development PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Miami, FL
(3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE [XI Check if project performed with current firm
a. Project engineer for redevelopment of this 11.3-acre site adjacent to Miami's Carnival Center for the Performing Arts. Composed of six, 58-65 story residential
towers offering 4,200 dwelling units and 350,000 square feet of retail. this site is poised to become the area's major retail/residential center. Responsibilities
included master planning, urban design concepts. landscape architecture, and coordination with the Florida Department of Transportation and the city on a year
long and ultimately unanimous public approvals process. Also worked with the city and the Omni CRA to re-establish the city's street grid. This plan divides the
existing super block into three smaller blocks with NE 16th and 17th Streets once again linking Biscayne Boulevard to Margaret Pace Park and the proposed
Baywalk. The new section of NE 17th Street will become an enhanced pedestrian/auto retail corridor with outdoor spaces for gatherings. Cost: $8.5 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Terrazas RiverPark Village PROFESSIONAL SERVICES I CONSTRUCTION (If ApplIcable)
Miami, FL
b. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE [XI Check if project performed with current firm
Project engineer for a Major Use Special Permit (MUSP) traffic analysis for a 320-unit high-rise condominium located in the City of Miami. Analysis included the
examination corridors by person-trip capacity, including transit ridership and study intersection capacity analysis. Cost: $83,250.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Empire World Towers PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Miami, FL
c. (3) BRIEF DESCRIPTION (Briefscope. sIze. cost, etc.) AND SPECIFIC ROLE [XI Check if project performed with current firm
Task manager for traffic analysis located on this two-acre parcel in downtown Miami. Designed by Kobi Karp Architects, Empire World Towers, if built. will be the
tallest towers and condominium in Miami and will consist of two 70- to 80-story buildings. Kimley-Horn's services include landscape architecture and urban design of
the ground floor and upper-level amenity decks, vehicle access and traffic analysis, and civil engineering due diligence for the Major Use Special Permit process.
Cost: $44,460.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Districtwide Traffic Operations Safety Studies PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Miami, FL 2003
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Responsible for conducting qualitative assessments. safety, and operational analyses, and corridor studies. Work included data collection, field assessments,
capacity analyses. and the development of safety improvements. Total project cost: $280,000.
(1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED
Infinity at Brickell (Infinity I and II) PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Miami, FL
(3) BRIEF DESCRIPTION (Brief scope, SIze, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
e. As project analyst. performed all of the geometric analysis for this project. Phase I responsibilities included a parking garage geometric/traffic circulation review to
determine areas of potential conflict between vehicular movements and structural elements. Analysis also examined turning radii at ramp locations. A conceptual
parking control plan, which examined the methods of separating different parking user groups throughout the garage using nesting techniques, was also performed.
Other responsibilities for Phase I included the preparation of brief functional descriptions of nesting operations and recommendations regarding access control
technologies. Phase II responsibilities included a parking garage geometric/traffic circulation review to determine areas of potential conflict. Phase II analysis also
included the vehicular operations in the loading areas, which involved an examination of the required height for refuse vehicles in the loading area. Cost: $274,066.
19. RELEVANT PROJECTS
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Aaron Buchler, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Quality Control/Quality Assurance
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
12 7
15. FIRM NAME AND LOCATION (City and State)
Kimley-Horn and Associates, Inc., Miami Beach, FL
16. EDUCATION (DEGREE AND SPECIALlZA nON)
Bachelor of Science / Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FLI P.E.
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Trammg. Awards. etc.)
More than ten years of experience in land development, utility systems, and drainage design. Extensive experience with the
entitlements, regulatory agencies and permitting processes in South Florida.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Midtown Miami and Related Parks PROFESSIONAL SERVICES
Miami, FL
(3) BRIEF DESCRIPTION (Briel scope. size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
a.
Located in the heart of Miami, this 56-acre brownfield is the largest redevelopment project in the City of Miami. Currently serving as a designer and working with the
architectural design team to develop a truly urban mixed-use master plan that can support 4,500 residential units, 1.2 million square feet of commercial
development, offices, and parks. The design includes nearly 12,000 linear feet of urban streetscapes, a linear park system, an urban plaza. and a series of vest
pocket parks. Kimley-Horn authored streetscape design guidelines for the project and prepared a regional activity center justification report to increase DRI
thresholds. The firm is currently designing all public infrastructure including roadways. utilities. traffic, landscape, and urban design elements, as well as private
developments as they come on line. Cost: $26 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Hialeah Park PROFESSIONAL SERVICES CONSTRUCTION (If Appticable)
Hialeah, FL
b. (3) BRIEF DESCRIPTION (Briel scope, sIze. cosl. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project engineer for this redevelopment project. Kimley-Horn is currently providing entitlement services, which include development of regional impact,
comprehensive plan amendment, rezoning. and master planning for the redevelopment of Hialeah Park in the City of Hialeah. Florida. Hialeah Park is a 202-acre,
former horse racing facility which first opened in 1926. The redeveloped site is expected to include 3.760 residential units, retail and office space. a town center,
school, and several parks and urban plazas. For future portions of the project, Kimley-Horn will provide civil engineering, urban design, landscape architecture,
planning. and project management services. Cost: TBD.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
The Lincoln PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami Beach, FL
c. (3) BRIEF DESCRIPTION (Briel scope. size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project engineer for site civil services for paving. grading, and drainage plans and permitting. The Lincoln is a multi-story, mixed-use facility that includes 120,000
square feet of Class A office space, 38,500 square feet of retail space, and 719 parking spaces. Kimley-Horn provided site civil services including paving, grading,
and drainage plans; landscape architecture; construction plans; and permitting. Cost: $70,000.
(1) TITLE AND LOCATION (Clly and State) (2) YEAR COMPLETED
Initial Transportation Plan PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Palmetto Bay, FL 2003
d. (3) BRIEF DESCRIPTION (Briel scope. size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Provided construction cost estimates for the initial transportation plan for the newly-incorporated Village of Palmetto Bay. As part of the effort. transportation plans
were reviewed to gather information about planned and programmed transportation improvements within the Village. Existing traffic conditions were assessed to
evaluate demand on the existing street network and to perform an initial determination of needs. Cost: $9,000.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami Jewelry District: Miami Downtown Development Authority PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami, FL
(3) BRIEF DESCRIPTION (Bnel scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
e. Project manager for this master plan and streetscape project. The Miami Jewelry District is the fourth largest Jewelry District in the United States (after New York.
Chicago, and Los Angeles). Located in the heart of downtown Miami, the Jewelry District is comprised of primarily of wholesale jewelry business with some retail
component in four city blocks. For the past decade. downtown Miami has been undergoing an economic revitalization which includes the introduction of several high-rise
mixed-use developments, as well as public infrastructure projects including the renovation of Flagler Street. Miami's main street; a new downtown master plan; and the
soon to come light rail line; which will run through the Jewelry District. The Jewelry District master plan and streetscape improvements are the next phase in the
continuing improvement of downtown. The current plan stems from the previously mentioned Downtown Master Plan and a vision study done for the Jewelry District.
The main purpose of this current Jewelry District planning is to establish a clear and unique identity for the Jewelry District and to implement that identity within the
public right of way (ROW). Kimley-Horn developed an implementation master plan for the ROW elements within the Jewelry District. In addition. we produce construction
documents for the streetscapes based on the implementation master plan. Cost: TBD.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
ALFREDO BUDIK, r.E,
E. RESUMES OF KEY PERSONNEL. PROPOSED FOR THIS CONTRACT
Com lele one Section E for each ke arson.
13. ROLE IN THIS CONTRACT
PROJECT MANAGER
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
20
17
15. FIRM NAME AND LOCATION (City and Stale)
BUREAU VERITAS NORTH AMERICA, INC. - MIAMI, FLORIDA
16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
BSCE - CIVIL ENGINEER
MSCE - GEOTECHNICAL ENGINEER
PROFESSIONAL ENGINEER - FLORIDA
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Traimng. Awards, elC)
PROFESSIONAL ENGINEER LICENSED IN FLORIDA, AMERICAN SOCIETY OF CIVIL ENGINEERS, NATIONAL SOCIETY OF
PROFESSIONAL ENGINEERS, FLORIDA ENGINEERING SOCIETY, AMERICAN CONCRETE INSTITUTE AND DEEP
FOUNDATION INSTITUTION
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (tl Applicable)
METRO RAIL NORTH CORRIDOR EXTENSION
MIAMI, FLORIDA 2006 2014 (projected)
a. (3) BRIEF DESCRIPTION (Briel scope. size, cosl. e/c) AND SPECIFIC ROLE [X ] Check if project performed with current firm
PROJECT MANAGER FOR THE SUBSURFACE EXPLORATION OF OVER 150 BORINGS TO 100 FEET DEEP AND 40
PERCOLATION TESTS - PROJECT COST ESTIMATED AT $800,000,000.00.
(1) TITLE AND LOCA TtON (City and State) (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (il Applicable)
CAPRI SOUTH BEACH, MIAMI, FLORIDA
2005 2007
b, (3) BRIEF DESCRIPTION (Briel scope, size, cost. e/c) AND SPECIFIC ROLE [X] Check jf project performed with current firm
TWO MID-SIZE CONDOMINIUM STRUCTURES ABOVE AN UNDERGROUND PARKING GARAGE FOR 400 VEHICLES.
SUBSURFACE EXPLORATION AND FOUNDATION RECOMMENDATIONS - PROJECT COST: $40,000,000.00.
(1) TITLE AND LOCATION (Ciry and State) (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
PINNACLE PARK, MIAMI, FLORIDA 2005
2007
C. (3) BRIEF DESCRIPTION (Briel scope. size, cost, e/c) AND SPECIFIC ROLE [X] Check if project performed with current firm
16-STORY APARTMENT BUILDING AND 9-STORY ADJACENT PARKING GARAGE. THE APARTMENT BUILDING WAS
FOUNDED ON AUGERCAST PILES AND THE PARKING GARAGE ON A SHALLOW FOUNDATION AFTER VIBRO-
FLOTATION SITE IMPROVEMENTS. PILE LOADING TESTS, SUBSURFACE EXPLORATION AND GEOTECHNICAL
RECOMMENDA TIONS - PROJECT COST: $35,000,000.00.
(1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
PROFESSIONAL BUILDING, MIAMI, FLORIDA
2006 2007
d. (3) BRIEF DESCRIPTION (Brief scope. Size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
IO-STORY OFFICE BUILDING AND A DETACHED 10-STORY PARKING GARAGE. SUBSURFACE EXPLORATION AND
FOUNDATION RECOMMENDATIONS FOR AUGERCAST PILES AND LOADING TESTS - PROJECT COST: $50,000,000.00.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
TREE ISLAND PARK AND PRESERVE, MIAMI, FLORIDA 2007
2008 (projected)
e. (3) BRIEF DESCRIPTION (Briel scope. size, cost, etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
PERCOLATION TESTS THROUGHOUT THE PROPOSED PARK FOR DRAINAGE DESIGN.
PROFESSIONAL COST: $16,000.00.
STANDARD FORM 330 (1/2004) PAGE 2
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Eric S. (Ric) Katz
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com Jete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Public Involvement Manager
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
39
24
15. FIRM NAME AND LOCATION (Clly and State)
Communikatz, Inc., 4141 NE Second Avenue, Suite 1010, Miami, FL 33137
16. EDUCATION (DEGREE AND SPECfALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
Bachelor of Science in Journalism
Bachelor of Science in Broadcasting
Master of Science in Communication
N/A
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc)
Inductee, Miami Dade College Alumni Hall of Fame; Greater Miami Chamber of Commerce, Board of Directors;
Transportation Infrastructure & Regionalism Committee, 2006 & 1995 Transportation Summits Chairman; New World
Center Action Committee, Downtown Transportation Task Force Chairman
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami Intermodal Center, Miami, FL 33137 PROFESSIONAL SERVICES CONSTRUCTION (1/ Apptlcable)
Public Affairs
Task Manager
a. (3) BRIEF DESCRIPTION (Bnef scope. size, cost, etc) AND SPECIFIC ROLE [X ] Check if project performed with current firm
Communikatz, Inc. provides community, governmental and media relations in support of the Florida Department of Transportation
District VI Miami Intermodal Center (MIC) project. Ric Katz has been a party to high level negotiations with staff of Miami-Dade
County and the Miami-Dade Aviation Department regarding passenger facility charges and funding for the MIC/MIA Connector,
elements essential to the viability of the MIC Proqram. Total PIP cost $2.5 million.
(1) TITLE AND LOCATION (Clly and State) (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (1/ Apptlcable)
Port of Miami Tunnel, Miami, FL 33137 Public Affairs Manager
b. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
The Port of Miami Tunnel will provide a direct connection to the Interstate Highway system, at the same time decongesting
downtown streets and keeping the port competitive. Ric Katz is the liaison on behalf of the Department to national and international
media, elected officials and the general public. Total PIP cost $1 million.
(1) TITLE AND LOCATION (Cily and Slate) (2) YEAR COMPLETED
Florida Department of Transportation's liaison officer to the PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Metropolitan Planning Organization Public Affairs
Consultant
c. (3) BRIEF DESCRIPTION (Bnef scope. size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
Liaison to the Miami-Dade County MPO and other governmental entities throughout the county. Responsibilities include
meeting with elected officials to brief them about the Department's work program, and in turn bringing their interests and
concerns to the Department's attention. Total contract $1.2 million.
(1) TITLE AND LOCATION (Cilyand State) (2) YEAR COMPLETED
South Florida East Coast Corridor Study PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Public Affairs
Manager
d. (3) BRIEF DESCRIPTION (Bnefscope. size, cost, etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Directed by FOOT District 4, the study seeks to reduce roadway congestion and improve mobility by providing local
and regional passenger transit service for Palm Beach, Broward and Miami-Dade Counties along an 85-mile-long,
two-mile-wide corridor centered on the FEC railway. Total contract $245,000
(1) TITLE AND LOCATION (Clly and Slale) (2) YEAR COMPLETED
95 Express/I-95 Managed Lanes, Miami-Dade & Broward PROFESSIONAL SERVICES
Counties, FL Public Affairs Manager
e. (3) BRIEF DESCRIPTION (Brief scope, size. cost. elc) AND SPECIFIC ROLE [X] Check if project performed with current firm
95 Express will bring high occupancy toll lanes to 1-95 between 1-395 in Miami-Dade and 1-595 in Broward.
Total PIP contract $650,000.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Aviva Baer
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Deputy Public Involvement
Mana er
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
20
15. FIRM NAME AND LOCATION (Cily and State)
Communikatz, Inc., 4141 NE Second Avenue, Suite 1010, Miami, FL 33137
16. EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
Bachelor of Arts in English Language & Literature N/A
18. OTHER PROFESSIONAL QUALIFICATIONS (PubltcatlOns. Organizations. Training. Awards. etc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
95 Express/l-95 Managed Lanes, Miami-Dade & Broward PROFESSIONAL SERVICES
Counties, FL Deputy Public Affairs
Manager
(3) BRIEF DESCRIPTION (Bf/ef scope. size. cost. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
a. 95 Express will bring high occupancy toll lanes to 1-95 between 1-395 in Miami-Dade and 1-595 in Broward.
Total PIP contract $650,000.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
South Florida East Coast Corridor Study, Miami-Dade & PROFESSIONAL SERVICES
Broward Counties, FL Public Affairs
Manager
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
b. Directed by FOOT District 4, the study seeks to reduce roadway congestion and improve mobility by providing local
and regional passenger transit service for Palm Beach, Broward and Miami-Dade Counties along an 85-mile-long,
two-mile-wide corridor centered on the FEC railway. Total PIP cost $245,000
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Florida Department of Transportation's liaison officer to the PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Metropolitan Planning Organization, Miami-Dade & Monroe Public Affairs
Counties, FL Consultant
(3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
c. Liaison to the Miami-Dade County MPO and other governmental entities throughout the county. Responsibilities include
meeting with elected officials to brief them about the Department's work program, and in turn bringing their interests and
concerns to the Department's attention. Total contract $1.2 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami Intermodal Center, Miami, FL 33137 PROFESSIONAL SERVICES
Deputy Public Affairs
Manager
(3) BRIEF DESCRIPTION (Bf/ef scope, Size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
d. Communikatz, Inc. provides community, governmental and media relations in support of the Florida Department of Transportation
District VI Miami Intermodal Center (MIC) project. Total PIP cost $2.5 million.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Tony Franyie, Jr.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke
13. ROLE IN THIS CONTRACT
MEP
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
16
14
15. FIRM NAME AND LOCATION (City and State)
Franyie Engineers, Inc.
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science in Electrical Engineering. 1991
Florida International University
Miami. Florida
17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (PublicatIOns, Organizations, Training. Awards, etc.)
Tony is responsible for the day to day activity in production. including plan and project coordination. He is directly involved in all his projects
and is the contact person for his clients in all their needs. Meeting deadlines is of extreme importance to our goals and scheduling the work
accordingly manages to be his forte.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED
Project Manager for Sandspointe Condominium PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
North Miami Beach, FL
a. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
A 28-story apartment building with recreation deck, pool and beach cabanas. Responsible for project coordination,
production and electrical design under supervision of Chief Electrical Engineer.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Electrical Designer and Staff Engineer for Cozumel Building PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
at Cape Marco, Marco Island, FL
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
A 23-story luxury condominium building. Responsible for project coordination and production.
(1) TITLE AND LOCATION (Clly and State) (2) YEAR COMPLETED
Park Grove Apartments - Hollywood, FL PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Windsor Pines Apartments - Pembroke Pines, FL
c. (3) BRIEF DESCRIPTION (Bnef scope. size. cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
Project manager for Park Grove Apartments and Windsor Pines Apartments for MIG Development.
(1) TITLE AND LOCATION (Clly and State) (2) YEAR COMPLETED
Gulf Shores Apartment Building PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Fort Myers, FL
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
Electrical designer for Gulf Shores Apartment Building project for the Ronto Group with Sotolongo Architects as
the prime consultant.
(1) TITLE AND LOCATION (Clly and State) (2) YEAR COMPLETED
New River Village Three Building Apartment Complex PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Fort Lauderdale, FL
e. (3) BRIEF DESCRIPTION (Brief scope, Size, cost. etc.) AND SPECIFIC ROLE Check if project performed with current firm
Electrical designer for New River Village Three Building Apartment Complex with Schapiro Associates for the
American Land Group.
. i=UG-21-2007 22: 47 From:
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
To: 1407S9SS400
Page:]/S
'12. NAME
e. RESUMES OF KeY PERSONNEL PROPOSED FOR THIS CONTRACT
Com /ele on9 S9/;,tion E for Bach kll rson.
13. ROLe IN TIolIS CONTRACT
14 Y~RS EXPERIENCe
a. TOTAl, b wmt CIJRREN) ~IIW
,30
NUP.M.-
\0
f:c A:u-\
ENT PROFESSIONAL
~S. eGoNC>M\CS
V\.~. ~~\Ne~'5 ~~\N,~~-nl)N
18. OTHER ~RO ~S:,sIONAL QUA~IFICATlONS (P,M..,;l/i(>n3. Olgenlzllllons, Tr.>ining. AW.I\1S,IiIlt.)
~+ oN W~~~\J\"-.1~ t-t-JO 'S~~~~<: \"-\fQ'LAAA.-\-\ON
<<2>~Qt..e.~ brr N\}~~~,S. N.M1o"lA'- ~- ~~ .be;. Seyo \ b.~A I V\l.C.
19 ReLEVANT PROJECTS
\ \JC, \~
I (Z) YEAR COMPL&nO
L (1) 1TTlE A'O LOCATION (City ~ s~ A
~ \-\ ~ ?\) ~\..\S 0 Nv M.f;c.(L '\)~ PROFESSIONAL SERVICES CONSTRUCTION (lfA~IJI8J
AAll<-\..C~ ON J"~~~~SUfC b~D
,^-I" ,~ N 'V\ .
a. (3) aRI~F t>ESCRI~TION (8mJfscofie. fize, ~~ 6lC) AND SPECIFIC KOLE [Xl Check If project perfonTled with curret'll firm
(1) 1TTlE AND LOCATION (Cily /1,1<1 Slate) f21 YEAR COMPLETED
P"Or-EiSSIONAL SERvICES CONSTRUCTION (If Applio9/)Iej
b, (3) BRIEF DESCRIP'nON (B'I41~, Jlze, co&(. 8lC.) AND SPt:CIFIC ROLE [Xl Check if project performed with current lirm
(1) 1TTlEA~O LOCATION (~and$tw) (2) YEAR COMPLETF.O
PROFESSIONAL SERVICES CONSTRUCTION (If Ap~)
c. (3) BRIEF DESCRIPTION (Briel soop... ""'. I,T}~. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
(1) TITLE AND 1.0CA TION (ely ,,2Il(l Srat9) (:2) YEAR COMPLE1'I:O
PROFESSIONAL SERVICES CONSTRUCTION ftrAppl~)
d. (3) BRIEF DESCI\IPTION (/3(a=lf"', .~, 0031. ~.) AND SPIOCIFIC ROLE [Xl Check if project performed with current linn
(1) TITLE AND ~UCATION (Ch'Ond :3r.C9) (2) YEAR COMPLETED
PROFESSIONAL SEJiVICES CONSTRUCTION (If APfJ/iCllbIe)
Q. (3) lilliEI' DESCRIPTION f~ 6<<JptI, rOm, rost, 8llI) AND SI"EOCIFIC ROLE Check 11 project performed with current firm
STANDARD FORM 330 (112004) PAGE 2
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
'.
.
.
12. NAME
Todd Hall
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each kev person.)
13. ROLE IN THIS CONTRACT
Controls Manager
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
7
7
15. FIRM NAME AND LOCATION (City and State)
Hall Fountains, Inc., Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALlZA TlON)
17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (PublIcations. Organizations. Trammg, Awards. etc.)
Todd, employed at Hall Fountains in 1999, is responsible for all computer interaction, programming, implementation and
communication with our fountain systems. For this project, Todd will be responsible for coordination of communication with the DMX
system, adjustable frequency motor drive set-up and electrical control layout.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED
Trump Sonesta Resort PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
Sunny Isle, FL
a. (3) BRIEF DESCRIPTION (Bnel scope, sIze. cost. etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
Responsible for all computer interaction, programming, implementation and communication with our fountain systems.
(1) TITLE AND LOCATION (CI/y and State) (2) YEAR COMPLETED
Trump Grand PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
Sunny Isle, FL
b. (3) BRIEF DESCRIPTION (Bnel scope, SIze, cost. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
Responsible for all computer interaction, programming, implementation and communication with our fountain systems
(1) TITLE AND LOCATION (CI/yand State) (2) YEAR COMPLETED
Acqualina PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
Sunny Isle, FL
c. (3) BRIEF DESCRIPTION (Bnel scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
Responsible for all computer interaction, programming, implementation and communication with our fountain systems
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Ocean 2 PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
Sunny Isle, FL
d. (3) BRIEF DESCRIPTION (Briel scope, sIze. cost. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
Responsible for all computer interaction, programming, implementation and communication with our fountain systems
(1) TITLE AND LOCATION (Cttyand State) (2) YEAR COMPLETED
Turnberry Ocean Colony PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
Sunny Isle, FL
e. (3) BRIEF DESCRIPTION (Briel scope. size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Responsible for all computer interaction, programming, implementation and communication with our fountain systems
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Kobi Karp
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Principal
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
20 12
15. FIRM NAME AND LOCATION (City and State)
Kobi Karp Architecture and Interior Design, Inc.
16. EDUCATION (DEGREE AND SPECIALIZATION) 17.
Bachelor of Architecture
Bachelor of Science in Environmental Design
CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Registered Architect in the States of :
Florida Minnesota
Colorado Nevada
New York Texas
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. etc)
American Institute of Architects, Norman Giller Award - 2006, National Association of Home Builders Award-2006, "Landmark
Award" - The Bridgewater 2006, Outstanding Young Architect of the Year Award (AlA) 1999, Outstanding Service Award, (AlA)
1999.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
St. Tropez Currently under Currently under
construction construction
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc) AND SPECIFIC ROLE [X ] Check if project performed with current firm
Principle Designer and Architect of a 3-tower condominium with 20 stories each wth a
500 space parking structure and commercial pedestal. Project contains approximately
448000 sa.ft. and will cost aooroximatelv 90 million dollars.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Sunny Isles Beach Marina PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Currently in Currently in
permittinq permittinq
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Principle Designer and Architect of a 228 unit, 2 tower condominium project with 23
floors and 448,000 sq.ft. The cost of the project is approximately 90 million dollars
(1) TITLE AND LOCATION (Cttyand State) (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
The Caribbean Condominium 2008 2008
c. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc) AND SPECIFIC ROLE [X ] Check if project performed with current firm
Project Manager and designer of 19 story condominium and Historic renovation project
that consists of 200,000 sq.ft. and a basement Garage structure on the Ocean. Cost of
oroiect is 60 Million and will be comnleted in 2008
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
La Perla Condominium, Sunny Isles Beach PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2007 2007
d. (3) BRIEF DESCRIPTION (Bnef scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Principle Designer and Architect of a Forty-two story condominium and parking
structure located at the pier in Sunny Isles Beach. Project consists of approximately
200000 sa.ft. and cost of 60 million dollars.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Sole on the Ocean PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2007 2007
e. (3) BRIEF DESCRIPTION (Bnef scope. S/le. cost. ete) AND SPECIFIC ROLE [X] Check if project performed with current firm
Principle Designer and Architect of a 24 story condo hotel in Sunny Isles Beach with
parking. Approximate cost of structure is 65 million and size of project is 250,000 sq.ft.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Jennifer McConney
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com Jete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Project Architect
10 9
14. YEARS EXPERIENCE
a. TOTAL b WITH CURRENT FIRM
15. FIRM NAME AND LOCATION (City and State)
Kobi Kar Architecture and Interior Desi n, Inc.
16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Bachelor of Architecture, University of Miami
Registered Architect. State of Florida
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Traming, Awards, etc)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Appticable)
The Caribbean Condominium 2006 2008
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [X ] Check if project performed with current firm
Project Manager and designer of 19 story condominium and Historic renovation project
that consists of 200,000 sq.ft. and a basement Garage structure on the Ocean. Cost of
oroiect is 60 Million and will be com Dieted in 2008
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Capri South Beach Condominium PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2006 2008
b. (3) BRIEF DESCRIPTION (Bnef scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Project Architect and Designer of a 3 building complex which included a basement
garage, 14 story tower, historic building and a 6 story mid rise. Project cost is 70 Million
and 114 000 sa.ft.
(1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
Nobe Parking Garage and Retail PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2006 2008
c. (3) BRIEF DESCRIPTION (Brief scope, Size, cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Five story Parking structure with a retail component in Miami Beach. Project cost is 5
million
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Maclee Headquarters PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2001 2002
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Project Manager and Project designer of a 5 story office and retail building with a 3
story parking structure. The project consists of approximately 45,000 sq.ft. and cost was
10 million
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami Beach Police Athletic League PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2000 2000
e. (3) BRIEF DESCRIPTION (Briefscope. size. cost, etc) AND SPECIFIC ROLE [X]Check if project performed with current firm
Project Manager and Designer of the new construction and renovation of Miami
Beach public building. The approximate sq.ft. is 40,000 and cost was 3 million.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
'.
.
12. NAME
Thomas Fiala
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
13. ROLE IN THIS CONTRACT
Project Architect in charge of
Construction
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
17 4
15. FIRM NAME AND LOCATION (C,ty and State)
Kobi Kar Architecture and Interior Desi n, Inc.
16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Bachelor of Science in Architectural Engineering
Bachelor of Science in Physics
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc)
American Institute of Architect
American Society of Civil Engineers
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
The Caribbean Condominium 2008 2008
a. (3) BRIEF DESCRIPTION (Bnef scope. size, cost, etc) AND SPECIFIC ROLE [X ] Check if project performed with current firm
Director of Construction Administration of 19 story condominium and Historic renovation
project that consists of 200,000 sq.ft. and a basement Garage structure on the Ocean.
Cost of oroiect is 60 Million and will be com Dieted in 2008
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Capri South Beach Condominium PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2008 2008
b. (3) BRIEF DESCRIPTION (Brief scope, size. cost. elc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Director of Construction Administration of a 3 building complex which included a
basement garage, 14 story tower, historic building and a 6 story mid rise. Project cost is
70 Million and 114 000 so.ft.
(1) TITLE AND LOCATION (ClIy and State) (2) YEAR COMPLETED
Nobe Parking Garage and Retail PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2008 2008
c. (3) BRIEF DESCRIPTION (Brief scope, size. cost. elc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Director of Construction Administration of a five story Parking structure with a retail
component in Miami Beach. Project cost is 5 million
(1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED
La Perla Condominium, Sunny Isles Beach PROFESSIONAL SERVICES CONSTRUCTION (/I Applicable)
2007 2007
d. (3) BRIEF DESCRIPTION (Brief scope. s,ze. cost. elc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Director of Construction Administration of a Forty-two story condominium and parking
structure located at the pier in Sunny Isles Beach. Project consists of approximately
200000 so.ft. and cost of 60 million dollars.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Sole on the Ocean PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2007 2007
e. (3) BRIEF DESCRIPTION (Brief scope, SIZe, cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Director of Construction Administration of a 24 story condo hotel in Sunny Isles Beach
with parking. Approximate cost of structure is 65 million and size of project is 250,000
sa. ft.
1--
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Michael O'Brien
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Lead Designer a. TOTAL b. WITH CURRENT FIRM
15
5
15. FIRM NAME AND LOCATION (City and State)
O'Brien Lighting, Miami, FL
16. EDUCATION (DEGREE AND SPECIALlZA nON)
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
BFA program for lighting design at the University of North
Carolina at Greensboro
t.E.S.N.A.
18. OTHER PROFESSIONAL QUALIFICATIONS (PublicatIons. Organizations, Trammg. Awards. etc)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State)
Paramount Bay
Miami, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Appf1cable)
Lighting Designer
(3) BRIEF DESCRIPTION (Brief scope. sIze. cost, etc) AND SPECIFIC ROLE
[Xl Check if project performed with current firm
a.
Involved directly in all stages of the project, from preliminary design to implementation, develops visual
guidelines, fixture specification, responses to RFIs, photometric calculations, perfonns load calculations.
Paramount Bay is a multibillion dollar project, featuring state-of-the-art 360-unit Luxury Residential
Condominium Tower rising to 46 stories along the bay in the dynamic Arts District north of downtown Miami.
Residences range from one to three bedrooms, and feature 10ft. ceilings, direct access private elevators, and
spacious, t1ow-through t100r plans offering panoramic, unobstructed views of Biscayne Bay, Miami Beach, South
Beach and the Atlantic Ocean. A dramatic curved glass entrance and porte-cochere open to an exclusive multi-
story lobby, providing convenient access to individual banks of private elevators and a well appointed array of
mezzanine level amenities, including a full spa and fitness center, multi-function party and clubrooms, verandas,
cabanas, pool and sun-deck.
O'Brien Lighting is responsible for designing interior and exterior lighting elements of this project. The scope
includes: public areas, roof terraces, pool deck, commercial area, landscaping, architectural lighting, building
structure illumination, site lighting.
(1) TITLE AND LOCATION (City and State)
Everglades on the Bay
Miami, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Appf1cable)
Lighting Designer
(3) BRIEF DESCRIPTION (Bnef scope, SIze, cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Involved directly in all stages of the project, from preliminary design to implementation, develops visual
guidelines, fixture specification, responses to RFls, photometric calculations, perfonns load calculations.
Everglades on the Bay is an urban multibillion dollar mixed use development in Miami, Florida which is currently
b. under construction. It is located in the northern section of Downtown Miami, on Biscayne Boulevard between
Northeast 2nd and 3rd Streets. The complex consists of two twin towers and the Everglades Plaza. Both towers
will be 538 ft (164 m) tall when complete, and each will have 49 floors. The Everglades Plaza will be a retail and
community center at the base of both towers, connecting both and occupying the entire city block.
O'Brien Lighting is responsible for designing exterior and landscape lighting elements of this project. The scope
includes: building illumination, street level illumination, pinnacle, pool deck, landscape.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
12. NAME
Alfonso C. Tello, P.E., P.L.S.
14. YEARS EXPERIENCE
b. WITH CURRENT
FIRM
a. TOTAL
40
38
15. FIRM NAME AND LOCATION (City and State)
Schwebke-Shiskin & Associates, Inc.
16. EDUCATION (DEGREE AND SPECIALlZA nON)
BSCE, University of Miami, Civil Engineering, 1977
3240 Corporate Way, Miramar, Florida 33025
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Land Surveyor - 1977
Land Surveyor Florida Registration #2978
Professional Engineer - 1982
Civil En ineer Florida Re istration # 32068
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.)
More than thirty-eight years in the Land Surveying field, experienced in boundary, topographic and construction surveying.
President of the Dade County Chapter of Professional Land Surveyors from 1984 thm 1985.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
City of Miramar, PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Broward County, Florida 2003 2007
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Project Manager for general surveying projects within the City of Miramar city limits. To include surveys for road design,
legal descriptions for utilities and other general surveying services.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami-Dade County Parks and Recreation Dept. PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Miami- Dade County, Florida 2004 N/A
b. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
General surveying services for the Parks Dept. to include boundary and topographic surveys.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami-Dade County Public Works Dept. PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Miami-Dade County, Florida 2003-2006 N/A
c. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Numerous Route surveys for roadway designs. Project Manager for the coordination for the surveying effort for the design of
numerous public rights-of-ways within Dade County.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Ocean Reef Club PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Key Largo, Monroe County, Florida 2000-2006 N/A
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
General constmction and land surveying services.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Cheeca Lodge PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Islamorada Key, Monroe County, Florida 2005 N/A
e. Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
Project Manager in charge of the Development and Pennitting of Water, Sewer, Paving and Drainage Plans.
STANDARD FORM 330 (1/2004) PAGE 2
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com Jete one Section E for each ke
12. NAME
Mark S. Johnson, P.L.S.
14. YEARS EXPERIENCE
b. WITH CURRENT
FIRM
a. TOTAL
20
2
15. FIRM NAME AND LOCATION (City and State)
Schwebke-Shiskin & Associates, Inc. 3240 Co
16. EDUCATION (DEGREE AND SPECIALIZATION)
BS, in Physics, Florida State University 1987
orate Way, Miramar, Florida 33025
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Land Surveyor
Civil Land Surveyor Florida Registration #4775
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards. etc.)
Approximately 20 years in the surveying field in the area of Miami-Dade County and Broward County, Florida. President of the
Dade County Chapter of Professional Land Surveyors.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Homestead Miami Speedway PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Miami-Dade County, Florida 2005 2005
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Project Surveyor for the reconstruction of the Homestead Miami Speedway. This project entailed the super elevation of the
Speedway surface together with other general surveying services.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Midtown, City of Miami Project PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Miami-Dade County, Florida 2004-2005 2005-2006
b. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Responsible for all the surveying related services got the development of the project known as Midtown Miami. This work
included the overall boundary survey together with all the interior layout. This work also included the preparation of
Condominium documents for the various buildings.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
City of Miami, Bayside PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Miami-Dade County, Florida 2004 2004
c. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
This project entailed the survey of the boundary of Bayside together with all of the interior improvements.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
People Mover & Metro Rail Settlement Monitoring PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Miami-Dade County, Florida 2001 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
d.
The study of the settlement of the Metro Rail columns pursuant to adjacent construction. This project entailed the monitoring
of the settlement as various building loads were applied immediately adjacent to each column that would support the Metro
Rail and People Mover.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
The Epic (Redevelopment of the Dupont Plaza) PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Miami-Dade County, Florida 2002 N/A
e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Boundary and Topographic Survey of the Dupont Plaza area.
STANDARD FORM 330 (1/2004) PAGE 2
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
12. NAME
Jose L. Sanfiel, P.L.S.
14. YEARS EXPERIENCE
b. WITH CURRENT
FIRM
a. TOTAL
20
I Y2
15. FIRM NAME AND LOCATION (City and State)
Schwebke-Shiskin & Associates, Inc.
16. EDUCATION (DEGREE AND SPECIALIZATION)
A I A in Surveying MDCC
11941 S. W. 144th Street, Miami, Florida 33186
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Land Surveyor
Civil Land Surveyor Florida Registration #5636
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Approximately 20 years in the surveying field in the area of Miami-Dade County and Broward County, Florida. President of
the Dade County Chapter of Professional Land Surveyors
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Marriott South Beach PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Miami-Dade County, Florida 2007 Present
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Responsible for constmction survey relating to control.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Midtown, City of Miami Project PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Miami-Dade County, Florida 2004-2005 Present
b. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Responsible for all of the surveying related services for the development of the project known as Midtown Miami. This work
included the overall boundary survey together with the entire interior layout. This work also included the preparation of
Condominium documents for the various buildings.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
People Mover & Metro Rail Settlement Monitoring PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Miami-Dade County, Florida 2004 Present
c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
The study of the settlement of the Metro Rail columns pursuant to adjacent constmction. This project entailed the monitoring
of the settlement as various building loads were applied immediately adjacent to each column that would support the Metro
Rail and People Mover
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Old Spanish Village PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Miami-Dade County, Florida 2007 Present
(3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
d. Responsible for all Survey related services for the development of the project. Presently includes boundary and topographic
survey with eventual platting and development services.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
South of 5th South Beach, Miami Beach PROFESSIONAL CONSTRUCTION (If
SERVICES applicable)
Miami-Dade County, Florida 2007 Present
e. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Responsible for constmction survey relating to control, as-builts, topographic.
STANDARD FORM 330 (1/2004) PAGE 2
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
DANIEL L. ZUMMALLEN
13. ROLE IN THIS CONTRACT
Quality Control and Scheduling
b. WITH CURRENT FIRM
12
15. FIRM NAME AND LOCATION (City and State)
Sweene & Associates, Inc. Fort Lauderdale, Florida
16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
BS, Landscape Architecture, 2002 ASLA. California, ASIC California
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
[ASLA (American Society of Landscape Architects). Mr. ZumMallen, vice president of the firm, has many years experience in
landscape construction and design. Mr. ZumMallen designs and manages large-scale irrigation projects from inception to completion using the
latest AutoCAD and Microstation drafting software. Mr. ZumMallen is the Principal in Charge of project scheduling and production for the entire
firm. He oversees and coordinates the firm's six irrigation design teams.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
WOODLANDS CEMETERY, CITY OF WOODLAND, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2004 2004
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Existing 28 acre cemetery irrigation system remodel. Preparation of irrigation construction drawings accommodating existing conditions.
Services included construction administration.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SAN DIEGO FEDERAL COURTHOUSE, SAN DIEGO, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2007
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Irrigation construction drawings for a Federal Courthouse building. Services include construction administration and site observations.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
COLONEL BILL BARBER MARIN CORPS MEMORIAL PARK, IRVINE, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2003 2004
c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Irrigation construction drawings for a 35 acre park project. Services included construction administration and construction observation
services.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
DEBENEDETTI PARK, LODI, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2005
d. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Irrigation construction drawings for a 49 acre park project. Services included construction administration.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
TUSCANY PARK, LAs VEGAS, NV PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2004 2004
e. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Irrigation construction drawings for a 12 acre park project. Services included construction administration and construction observation
services.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
13, ROLE IN THIS CONTRACT
Project Management and Design
b. WITH CURRENT FIRM
6
15. FIRM NAME AND LOCATION (City and State)
Sweene & Associates, Inc. Fort Lauderdale, Florida
16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Mr. Kochanek has several years experience in both landscape irrigation design and field services. Mr. Kochanek has been a LEED
Accredited Professional for two years and has been involved in numerous LEED certified projects. In his role as Project Manager, Mr. Kochanek
supervises his team of irrigation designers and AutoCAD drafters.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
ANSIN PARK, MIRAMAR, FLORIDA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2006
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 611 Check if project performed with current firm
Irrigation construction drawings for a 25 acre park project. Services included construction administration.
(1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED
SAN DIEGO FEDERAL COURTHOUSE, SAN DIEGO, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2007
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 611 Check if project performed with current firm
Irrigation construction drawings for a Federal Courthouse building. Services include construction administration and site observations.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
RITTER RANCH SPORTS PARK, PALMDALE, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2006
c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 611 Check jf project performed with current firm
Irrigation construction drawings for a 18 acre park project with central control.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
McALISTER RANCH GOLF BUFFER, BAKERSFIELD, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2006
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 611 Check if project performed with current firm
[Irrigation construction drawings for a 30 acre golf course transition zone. Services included construction administration.
(1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED
AUDIE MURPHY RANCH SPORTS PARK, RIVERSIDE COUNTY, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2007
e. (3) BRIEF DESCRIPTION (Brief scope. size, cost, ete.) AND SPECIFIC ROLE 611 Check if project performed with current firm
Irrigation construction drawings for a 12 acre park project. Services included construction administration.
.
..
.
.
.
.
.-
.
.-
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
12. NAME
Kenneth H. Creveling, AICP
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com Jete one Section E for each ke
13. ROLE IN THIS CONTRACT
Economic Feasibility/Financial Analysis
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
40 16
15. FIRM NAME AND LOCATION (Ci/yand State)
URBANOMICS, Inc., Ponte Vedra Beach, Florida
16. EDUCATION (DEGREE AND SPECIALlZA TlON)
Rutgers University, 1961, BS and BA Degrees -- a five-year
program combining civil engineering, urban planning, and the
social sciences.
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards, etc.)
American Planning Association (APA); Florida Chapter APA (FAPA); Florida Planning and Zoning Association (FPZA); Urban Land
Institute (ULI); Economic Advisor, South Carolina Main Street program; ULI Real Estate Market Profiles, Jacksonville, Naples, and
Sarasota, Florida; American Institute of Architects R/UDAT member, Hermosa Beach, California
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Charter Member, American Institute of Certified Planners
(AICP)
19. RELEVANT PROJECTS
- (1) TITLE AND LOCATION (City and State)
(2) YEAR COMPLETED
Community Development (market, impact & funding studies) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Downtown Areas
Charlotte, NC -- Center City 2010 Plan
Jacksonville, FL -- Downtown Master Plan
Jacksonville, FL -- LaVilla Convention Center Subdistrict Plan
Winter Haven, FL -- Downtown and Urban Lakefront Plan
Urban Neiqhborhoods
a. Charlotte, NC -- Piedmont Courts/Belmont
Clearwater, FL -- North Greenwood
Jacksonville, FL -- Durkeeville/Myrtle Avenue
Key West, FL -- Bahama Village
(3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Community Development. analyses of market conditions and opportunities for infill, reuse, and redevelopment and
preparation of development and financing strategies for local governments, public agencies, and community organizations.
-
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Recreation and Tourism (demand, market & financing studies) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Atlantic Beach, FL - community center and skate park feasibility
Charleston Co, SC - regional park usage, cost, and revenue analysis
Folly Beach, SC - ocean fishing pier feasibility
Fort Walton Beach, FL - convention center/entertainment complex
Newport News, VA - facilities demand, plan, and CIP analysis
b. Reston, VA - facilities usage, revenue, and funding analysis
St. Johns County, FL - rec master plan cost and funding analysis
(3) BRIEF DESCRIPTION (Briefscope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Recreation and Tourism: demand and utilization studies, cosUrevenue analyses and funding strategies, economic and fiscal
impact analyses for parks, recreation facilities, and tourist attractions; community and regional tourism surveys and industry
development strategies; clients include local governments, public agencies, chambers of commerce, and private interests
-
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Real Estate Development (market, feasibility, and impact studies) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Retail. Office, Hotel. Entertainment. and Mixed-Use Proiects
Gainesville area, FL (multiple projects)
Fort Walton Beach/Destin area, FL-(multiple projects)
Fort Myers/Naples area, FL (multiple projects)
Jacksonville area, FL (multiple projects)
c. St. Augustine area, FL (multiple projects)
(3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Real Estate Development: analyses of market opportunities and preparation of development strategies for residential,
commercial, and industrial properties; preparation of land use strategies for communities; analyses of economic and fiscal
impacts of development for public and private owners and developers of real estate.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency. or 10 projects, If not specified.
Com Jete one Section F for each ro 'ecl.
20. EXAMPLE PROJECT KEY
NUMBER
21. TITLE AND LOCATION (City and State)
City of Miami Beach Parks
Miami Beach, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if Applicable)
2001 2001
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of Miami Beach Recreation Center
b. POINT OF CONTACT NAME
Kevin Smith
c. POINT OF CONTACT TELEPHONE NUMBER
(305) 673-7730
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Miami Beach showcases a variety of active and passive parks that appeal to tourists and the local community. The firm was
selected by the City to renovate 11 community parks. These renovations are part of the Safe Neighborhood Parks bond program,
which provides funding for community park improvements. The parks range in size from one to 12 acres. Some of the park features
include basketball, handball, and tennis courts, tot lot and playground areas, community/recreation centers, walkways, and
waterway overlooks.
We divided the City into three geographical areas to maintain
use of at least one local park during construction. Instead of
closing all the parks in one central location, renovations
occurred on a rotating basis in each area. This allowed local
residents to maintain the use of other parks in their area while
one was being renovated. We also worked with the City to unify
all site furnishings and fixtures. Not only did this establish a
cohesive look for the city and each park, it resulted in a one-
time-only bid and purchase effort. Cost: $2.4 million.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
a. Kimley-Horn and Associates, Miami Beach, FL
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
b. Kimley-Horn and Associates, Vero Beach, FL
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
C.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
f.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(3) ROLE
Landscape architecture, site planning, site civil
engineering, bid coordination services, and
construction administration
(3) ROLE
Landscape architecture
(3) ROLE
(3) ROLE
(3) ROLE
(3) ROLE
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects. If not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
Royal Palm Pointe Park
Vero Beach, FL
20. EXAMPLE PROJECT KEY
NUMBER
2
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
2001
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of Vero Beach
c. POINT OF CONTACT TELEPHONE NUMBER
(772) 978-5151
AWARDS
Award of Honor, American Society of Landscape Architects,
Florida Chapter Engineering Excellence Award, Florida
Institute of Consulting Engineers, 2002
Engineering Excellence Award, Florida Institute of Consulting
Engineers, 2002
This enhancement project included coordinating multiple
subconsultants, conducting several public consensus
workshops, assisting city government in applying for and
securing various grants, expediting environmental permits,
and ultimately producing a comprehensive redevelopment
plan for the 2,800-foot corridor. A key to this project's success
was analyzing the condition of the aging urban infrastructure
(roads, utilities, sidewalks, etc.) and developing a
comprehensive redevelopment package that upgraded this
infrastructure in a manner that will encourage redevelopment
while spreading the cost over a number of state, federal, and
local funding sources. Included within the project is a three-
acre urban waterfront park including a participatory fountain,
park pavilion, multilevel plaza, bulkhead, courtesy boat slips
and pier. The total project implementation was funded
through a variety of sources including a special assessment
district for the Pointe property owners; general City revenue
sources; utility and roadway funding; and grants from the Florida Inland Navigation District and the U.S. Army Corps of Engineers.
Cost: bid price: $4.89 million; actual: $4.85 million.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Kimley-Horn and Associates, Port St. Lucie, FL Marina/boat slip design and construction,
a. Inc. consensus-building, roadway design, environmental
services, coordination with City government in
applying for and securing various grants
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b. Kimley-Horn and Associates, West Palm Beach, FL Project management, roadway design, general civil
Inc. engineering, drainage, structural engineering,
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c. Kimley-Horn and Associates, Miami Beach, FL Landscape architecture
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d. Kimley-Horn and Associates, Sarasota, FL Landscape architecture
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e, Kimley-Horn and Associates, Vero Beach, FL Project management, construction observation,
Inc.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
20. EXAMPLE PROJECT KEY
NUMBER
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
Com fete one Section F for each ro 'ecl.
21. TITLE AND LOCATION (City and State)
Boynton Beach Boulevard Extension and Promenade
Boynton Beach, FL
3
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if Applicable)
2004 2005
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Burkhardt Construction, Inc.
b. POINT OF CONTACT NAME
Lisa Bright, CRA Director
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,
size, and cost)
AWARD
Roy F. Kenzie Award - Best Capital Project/Beautification Award, Florida Re-
development Association
Burkhardt Construction and Kimley-Horn served the City of Boynton Beach
Community Redevelopment Agency (CRA) for a boardwalklstreetscape
project along the Intracoastal Waterway involving the extension of Boynton
Beach Boulevard. This project is a part of a redevelopment effort by the CRA
to improve the City's waterfront. The project consists of two specific elements:
the extension of Boynton Beach Boulevard from US 1 to the Intracoastal
Waterway, and the construction of a boardwalk along the Intracoastal
Waterway from Boynton Beach Boulevard north for approximately 4,000 feet.
This project will act as the link between the private sector and public sector
redevelopment activity that has already commenced in this area. Cost: $8.8
million.
c. POINT OF CONTACT TELEPHONE NUMBER
(561) 737.3256
,...
/'
...
(1) FIRM NAME
(2) FIRM LOCATION (CltyandS/a/e)
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. Kimley-Horn and Associates, Miami Beach, FL
Inc.
(1) FIRM NAME (2) FIRM LOCATION (Ci/yandS/a/e)
b. Kimley-Horn and Associates. West Palm Beach, FL
Inc.
(1) FIRM NAME
(2) FIRM LOCATION (Ci/y and State)
c. Kimley-Horn and Associates, Fort Lauderdale, FL
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and S/a/e)
d. Kimley-Horn and Associates, Sarasota, FL
Inc.
(1) FIRM NAME (2) FIRM LOCATION (CltyandS/ate)
e. Kimley-Horn and Associates, Port St. Lucie, FL
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
f. Kimley-Horn and Associates, Tampa, FL
Inc.
(3) ROLE
Project management, streetscape design,
landscape architecture design, and permitting
(3) ROLE
Roadway design. infrastructure design, permitting,
and construction phase services
(3) ROLE
Roadway design, project management
(3) ROLE
Landscape architecture design
(3) ROLE
Environmental permitting; traffic analysis
(3) ROLE
Environmental permitting
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Presenl as many projects as requested by the agency, or 10 projects, If not specified.
Comolete one Section F for each oroiect.J
21. TITLE AND LOCATION (City and State)
Midtown Miami and Related Parks
Miami, FL
20. EXAMPLE PROJECT KEY
NUMBER
4
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
2006
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Midtown Equities, LLC
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE
TO THIS CONTRACT (Include scope. size, and cost)
b. POINT OF CONTACT NAME
Daniel K. Pfeffer, President
c. POINT OF CONTACT TELEPHONE NUMBER
(212) 726-077
~~
C!D D U r)~!!I
;:::
AWARD
First Place - Outstanding Redevelopment
Study, Gold Coast Section of the American
Planning Association
Located in the heart of Miami, this 56-acre
brownfield is the largest redevelopment
project in the City. Kimley-Horn and Urban
Resource Group, in association with
Zyscovich, Inc., worked with the
architectural design team to develop a truly
urban mixed-use master plan that can
support 4,500 residential units; 1.2 million
square feet of commercial development; and
offices and parks. The design includes
nearly 12,000 linear feet of urban
streetscapes, a linear park system, an urban
plaza, and a series of vest pocket parks.
Kimley-Horn authored streetscape design guidelines for the project and prepared a Regional Activity Center (RAC) justification
report to increase DRI thresholds. We have designed all public infrastructure including roadways, utilities, traffic, landscape, and
urban planning. To date. the firm has also been the landscape architect and civil engineer of record for all private-sector
developments within the project. Cost: $26 million.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Kimley-Horn and Associates, Miami Beach, FL Urban design, land use and comprehensive
Inc. planning, landscape architecture, civil engineering,
a. utility engineering, environmental engineering,
project management, funding, traffic engineering
and transportation planning
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Kimley-Horn and Associates, Miami, FL Utility profiling/coordination, permit scheduler, site
Inc. inspection and calculations, water/sewer design,
b. COD reports, drainage report/exhibits, OPC, zoning
approval, capital improvements, public right-of-way
improvements, sight triangulation, environmental
restoration analysis, shop drawing reviews
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c. Kimley-Horn and Associates, Jacksonville, FL Brownfield remediation; hydrogeology
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d. Kimley-Horn and Associates, Vero Beach, FL Roadway design
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e. Kimley-Horn and Associates, Port St. Lucie, FL Design
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e. Kimley-Horn and Associates, Atlanta, FL Traffic analysis
Inc.
.
.
.
:e
I.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
Complete one Section F for each Droiect.J
21. TITLE AND LOCATION (City and State)
South Pointe Streetscape and Park
Miami Beach, FL
20. EXAMPLE PROJECT KEY
NUMBER
5
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
2002
23. PROJECT OWNER'S INFORMATION
b. POINT OF CONTACT NAME
Timothy Hemstreet, Special
Assistant to the Cit Mana er
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost)
c. POINT OF CONTACT TELEPHONE NUMBER
(305) 673-7010
a. PROJECT OWNER
Miami Beach Redevelopment Agency
The South Pointe Streetscape project was the first phase of a capital improvements program for the world-renowned "South Beach"
section of Miami Beach. The project consisted of complete reconstruction of drainage system, sidewalks and a high level of finish
streetscape/hardscape including an interactive fountain, landscape, irrigation, colored concrete sidewalks, brick pavers, street
furniture and an at grade street events plaza. Our firm was contracted to update the Duany Plater-Zyberk master plan for South
Pointe and prepare complete construction documents for all the improvements. Working closely with DPZ, we updated the master
plan and prepared a comprehensive phasing plan and cost estimates for the City-on time and within budget. Together with the
City, we developed an aggressive schedule for Phase I. Cost: $24 million.
FountaJn
Pump
Hou..
.$:r.', :\.~ :
.:n.:.:.>'f:a;.J .t!..I '
. r/--" -~ ,\
:::=.::;-/ I I "" \
I .
1='
,Ir..,.
->....-
_Clo....."-
..-...e~""-"_'
/
/
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Kimley-Horn and Associates, Miami Beach, FL Consensus building; master plan development;
Inc. landscape, streetscape and lighting design; permit
a. coordination with DEP, DERM, FDOT, Dade County
and the City of Miami Beach; area-wide
infrastructure design including waterline sanitary
sewer and stormwater facilities; and complete
construction documentation
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b. Kimley-Horn and Associates, West Palm Beach, FL CADD design
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c. Kimley-Horn and Associates, Fort Lauderdale, FL Civil engineering; roadway plans task management;
Inc. design/permitting water distribution
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects. If not specified.
Com lete one Section F for each ro 'ect.
20. EXAMPLE PROJECT KEY
NUMBER
6
21. TITLE AND LOCATION (City and State)
Coral Way Beautification Master Plan and Design Guidelines
Miami, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if Applicable)
2002
23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
(305) 416-1419
a. PROJECT OWNER b. POINT OF CONTACT NAME
City of Miami Enrique D. Nunez, Planner
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost)
AWARD
Award of Honor, American Society of Landscape Architects, Florida Chapter
Under our general landscape architect services contract with the City of Miami, the firm was selected to prepare a beautification
master plan and design guidelines for the historic Coral Way Corridor. Preserving and enhancing the night visibility of the 75-year
old Banyan trees was a critical component of this project. Lighting demonstrations were conducted with the public to select the
optimal lighting effect for these historic trees. Based on the tenets of New Urbanism, design guidelines were prepared to regulate
the building heights, setback, mass, landscape, parking, and overall relationship to Coral Way. Cost: $75,000.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(3) ROLE
Urban planning, urban design, landscape
architecture, community consensus building,
charrette planning and facilitation, and lighting
design
(3) ROLE
(1) FIRM NAME (2) FIRM LOCATION (City and State)
Kimley-Horn and Associates, Miami Beach, FL
a. Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
C.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
e.
(3) ROLE
(3) ROLE
(3) ROLE
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
ComDlete one Section F for each Droiect.)
21. TITLE AND LOCATION (City and Stata)
Multi-Story Target Parking Deck
Deerfield Beach, FL
20. EXAMPLE PROJECT KEY
NUMBER
7
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
2001
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Dayton-Hudson Corporation
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO
THIS CONTRACT (Include scope, size, and cost)
c. POINT OF CONTACT TELEPHONE NUMBER
(612) 761-3726
When the Target Corporation wanted to expand
their store in Deerfield Beach, Florida, an area
with limited available local property, the most
profitable solution was to tear down the existing
store and build a two-story expansion in its place.
Since the new Target -- the first two-story Target
store in Florida -- would require more parking
space than was available on the property,
Kimley-Horn was retained to design an adjacent
two-level parking facility.
II
--~
,~- ". -
The parking deck has three open stair towers,
one enclosed stair tower, and one elevator.
Automobile access to the elevated parking level
is provided by an external speed ramp that is a
combination of both precast and cast-in-place
components. Precast concrete facades were
detailed to match the exterior facade of the new
two-story Target.
The design consists of one elevated parking level constructed of precast concrete and one at-grade parking level, all within a
footprint measuring 372 by 252 feet. The elevated precast concrete deck is supported by cast-in-place concrete foundations, while
the lower-level parking surface is a concrete slab-on-grade. From the deck's second level, a connecting pedestrian bridge provides
access to the store. Cost: $3.25 million.
Size: 600 spaces, 7.75-acre site
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and Stata) (3) ROLE
a. Kimley-Horn and Associates, West Palm Beach, FL Inspection
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and Stata) (3) ROLE
b. Kimley-Horn and Associates, Phoenix, AZ Quality control/quality assurance
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and Stata) (3) ROLE
Kimley-Horn and Associates, Raleigh, NC Overall project management, parking and functional
c. Inc. layout, structural and civil engineering, landscape
architecture, and construction phase services
(1) FIRM NAME (2) FIRM LOCATION (City and Stata) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and Stata) (3) ROLE
e.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
F. EXAMPLE PROJECTS WHICH BEST IllUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency. or 10 projects. If nol specified.
ComDlele one Section F for each Droiect.)
21. TITLE AND LOCATION ICity and Stale)
Target Parking Deck
Plantation, FL
20. EXAMPLE PROJECT KEY
NUMBER
8
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
2003
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME
Target/Mervyn's Bill Zanoni
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
c. POINT OF CONTACT TELEPHONE NUMBER
(612) 761-5384
Kimley-Horn provided engineering-related services for the design and construction of a two-level (ground plus one elevated level)
parking deck for the proposed Target store in Plantation, Florida. The existing Target store on the site was demolished and a new
store was built. Alongside the new store is the two-level parking deck with 331 spaces.
The elevated parking deck features precast concrete construction on shallow foundations and is 244 feet by 227 feet with the lower
level being concrete slab-on-grade. The upper level is accessed via an external express ramp. The deck has been designed to
accommodate a potential future elevated level containing another 170 spaces. Two functional design features are: (1) orienting the
main elevator and stair towers to promote flow into a pedestrian plaza and (2) providing cart storage below the external express
ramp. Cost: $4.5 million.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (Clly and State) (3) ROLE
Kimley-Horn and Associates, Raleigh, NC Overall project management, parking and functional
a. Inc. layout, structural and civil engineering, landscape
architecture, and construction phase services
(1) FIRM NAME (2) FIRM LOCATION (CIty and State) (3) ROLE
b. Kimley-Horn and Associates, Phoenix, AZ Quality control/quality assurance
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
(1) FIRM NAME (2) FIRM LOCATION (Clly and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (Clly and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
~-
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
Como/ete one Section F for each oroiect.J
21. TITLE AND LOCATION (City and State)
Omni Development
Miami, FL
20. EXAMPLE PROJECT KEY
NUMBER
9
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Downtown Miami Mall, LLC
b. POINT OF CONTACT NAME
Jeremy Klein
c. POINT OF CONTACT TELEPHONE NUMBER
(212) 692-5413
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Incfude scope, size, and cost)
NE nTH tERRACE
~
"
~
S
8l: ~
- n.' '
. .1 ., ~
. ~~ i
, Ilfit ~
flm,:
Following 15 years of steady decline, the Omni area is experiencing resurgence as a
part of Miami's development boom. Created by the City of Miami, the Omni
Community Redevelopment Authority (CRA) proposed a bold new plan for the
redevelopment of the entire area located along Biscayne Boulevard and Biscayne
Bay. Working alongside the Omni CRA and world-renowned architectural firm
Arquitectonica, Kimley-Horn is providing planning approval, site planning, urban
design, civil engineering, and landscape architecture services. With six, 58-65 story
residential towers offering 4,200 dwelling units and 350,000 square feet of retail
space. this 11.3-acre project will accomplish the CRA's goal to reinvigorate the urban
core with people-activated streets, parks and plazas. Kimley-Horn is also working
with the City and the Omni CRA to re-establish the City's street grid. The plan is to
divide the one super block into three smaller blocks with NE 16th and 17th Streets
once again linking Biscayne Boulevard to Margaret Pace Park and the proposed
baywalk. Additionally, NE 17th Street will become an enhanced pedestrian/auto retail
corridor with outdoor spaces for gatherings. Total cost of project: $8.5 million.
~E ltroSTREE'
~
~
~
~
~~.'~~,~~T
NE '5TH STREET
VETRO '-'OilER
, <
.
~~
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Kimley-Horn and Associates, Miami Beach, FL Planning approvals, site planning, urban design,
a. Inc. landscape architecture, coordination with city and
state agencies on overall design integration
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b. Kimley-Horn and Associates, Miami, FL Due diligence; civil engineering
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c. Kimley-Horn and Associates, Fort Lauderdale, FL Due diligence; civil engineering
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Presenl as many projects as requested by the agency, or 10 projects, If not specified.
Comolete one Section F for each oroiect.)
21. TITLE AND LOCATION (City and State)
(Miami) River Front and Water Front Park
Miami, FL
20. EXAMPLE PROJECT KEY
NUMBER
10
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Miami River, LLC
b. POINT OF CONTACT NAME
Bob Stout
c. POINT OF CONTACT TELEPHONE NUMBER
(305) 377-1001 ext. 204
^
...
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
As part of the renaissance taking place along the Miami River, this 11-acre
site will be home to six 54-story towers with 3,000 luxury condominiums and
more than 100,000 square feet of retail space, all connected by pedestrian
plazas and covered arcades. The plans call for ten water features and more
than 1,000 linear feet of riverfront improvements, which were guided by the
Greenway Regulatory Enhancement Program prepared by Kimley-Horn's
Urban Resource Group and adopted by the City of Miami.
Upon the successful preparation and approval of the River Front MUSP
(Major Use Special Project) documents, Kimley-Horn, with its Urban
Resource Group division, was retained to prepare the urban design and
construction documents for the entire site. Each of the six high-rise
residential towers will have a 10th floor pool amenity deck, and URG has
also been retained to design several of those.
Additional aesthetic focus was placed on a project-wide master graphics
package and wayfinding system, enhanced traffic-calming vehicular plazas,
and imported European street furniture, and pedestrian lighting. A series of
water features will begin at the SW 3rd Street project entry, continue through
the center of the main street, and culminate in a series of cascades at the
river's edge. There, the new Riverwalk will connect with the existing
improvements of adjacent properties. Cost: $6 million (not including towers).
- ~
-,_. J
r
__I
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. Kimley-Horn and Associates, Miami Beach, FL Urban planning, urban design, landscape
Inc. architecture, water features, signage, and graphics
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (CIty and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
.
.
'.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in "Example Projects Key' section below before completing
PERSONNEL CONTRACT table. Place "X' under project key number for
(From Section E, (From Section E, narticioation in same or similar role.)
Block 12) Block 13) 1 2 3 4 5 6 7 8 9 10
Jack Perry, RLA, ASLA Project Manager X X
Jerry Ingram, P.E. Principal-in-Charge
Chris Barton, RLA, AICP Park Planning
Jonathan Haigh, RLA, Park Planning
ASLA
James Pankonin, RLA, Landscape Architect
AS LA
Jimmy Bellamy Landscape Architect X
Manny Arencibia, RLA, Landscape Architect X X X
ASLA
Fadi Khalil, P.E. Civil Engineering
Walter Lugo, P.E. Civil Engineering X
Dean Penny, P.E. Parking Deck Structural X X
Engineering
Adam Cochran, P.E. Parking Deck Structural X X
Engineering
Jamie Farnham, E.!. Parking Deck Structural
Engineering
Ted Kendziora Environmental
Burt Baldo, P.E. Roadway/Traffic/MOT
Faisal Awan Roadway/Traffic/MOT
Randall Blanchette Civil Engineering
John McWilliams, P.E. Traffic Engineering X
Ken Creveling, AICP Financial Analysis
Alfredo Budik, P.E. Geotechnical
Ric Katz Public Relations/Public
Workshoos
Aviva Baer Public Relations/Public
Workshoos
Tony Franyie, Jr. MEP
Richard Golber Graphics/Wayfinding
Todd Hall Water Feature Design
Kobi Karp, AlA Architecture
Jennifer McConney, AlA Architecture
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Thomas Fiala Arch itectu re
Michael O'Brien Lighting Design
Alfonso Tello, P.E., PLS Survey
Mark Johnson, PLS Survey
Jose Sanfiel, PLS Survey
Daniel ZumMallen Irrigation
Ted Kochanek Irrigation
29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
1 City of Miami Beach Parks 6 Coral Way Beautification Master Plan and Design
Guidelines
2 Royal Palm Pointe Park 7 Multi-Story Target Parking Deck
3 Boynton Beach Boulevard Extension and Promenade 8 Target Parking Deck
4 Midtown Miami and Related Parks 9 Omni Development
5 South Pointe Streetscape and Park 10 RiverFront and Water Front Park
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED.
The Sunny Isles Beach shoreline and Collins Avenue corridor have been improving steadily; Kimley-Horn and
Associates, Inc. and our selected team partners have supported changes over the past 20 years. The City's
commitment to provide a vibrant new park space with much needed park and beach parking, as well as a
connection to the shoreline, will further strengthen the Collins Avenue corridor. Our team has participated in a
broad range of private development and public infrastructure projects in the area surrounding the Heritage
Park site, so it is with a great deal of personal and professional pride that I submit our qualifications to you.
Project Manager with a Resume of Success on Similar Complex Projects. I will serve as your project
manager and lead park planner/landscape architect. As a land planner, urban designer, and landscape
architect, I have 26 years of experience with America's most successful cities, counties, community/property
developers, and entertainment companies. I have had the opportunity to participate in the creation of landmark
master-planned communities and parks, and understand the importance of building to own and maintain
for the long haul. One of my most notable projects is The Walt Disney Company's Disneyland Paris, where I
served as the facility design manager and lead landscape architect for the park's Guest Entry Sequence, a $50
million sequence of structures and open spaces related to resort guest arrival: by foot, car, bus, taxi, and train.
I managed a team of 15 in-house planners, architects, interior designers, landscape architects, and graphic
personnel and also coordinated a sizable team of French designers and construction managers. My
experience and attention to detail will help guide this project to a successful conclusion.
Jerry Ingram, P.E. will serve as the principal-in-charge on this project. A principal and owner of the firm, Jerry
has been involved in professional planning and transportation engineering activities for 40 years. He directs
and serves as client liaison for a range of public and private sector projects. Our quality control/quality
assurance manager, Aaron Buchler, P.E., has more than 10 years of experience in land development, utility
systems, and drainage design. He has extensive experience with entitlements, community development
districts, the regulatory agencies and permitting processes in South Florida, including South Florida Water
Management District and DERM permits.
Our Team Understands the City's Desire to Develop Thoughtfully. We know that this project will be a
multidisciplinary effort, and we are well versed in all aspects of the scope of services outlined in your RFQ.
Therefore, I have assembled a local team that truly understands the City's desire to develop thoughtfully,
providing a full range of associated facilities such as schools, street improvements, and in this instance, a new
park. Our team brings local expertise along with a national perspective to this important project. We firmly
believe that the City of Sunny Isles Beach deserves the attention of a team already engaged within the city and
one that is familiar with your staff.
Kimley-Horn's approach to every project is tailor-made, and we have developed an approach for this particular
project that is as unique as Heritage Park. Our collaborative design approach integrates the market conditions
and economics of the project and ensures that we will deliver construction documents that are code buildable
and reflect the timely execution of your funding and development schedules. We understand your expectations
and we are committed to meeting and exceeding them.
Subconsultants and Special Resources to Strengthen Our Team. We have assembled a team of
subconsultants and special resources who have specific technical and design experience for exactly this type
of project. In addition, some have direct experience with the City of Sunny Isles Beach. Some of our partners
on this submittal include:
Kobi Karp Architects and Interior Design will lead the effort on all enclosed and freestanding
architectural park structures, the parking deck and associated facilities. In addition, they will provide
interior design services. Notable projects include Meridian Condo Hotel, Sunny Isles Beach Marina
Condominiums, St. Tropez Condominiums The Strand on Ocean Drive, The Astor Hotel, The Cadillac
Hotel, and The M-Resort.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Communikatz, Inc. is recognized for community, governmental, and media relations. Under the
leadership of Ric Katz, the firm is known for public involvement and consensus-building efforts on
projects such as Miami Beach's Collins Avenue Reconstruction Project and the current South Florida
East Coast Corridor Transit Analysis.
Guidance Group will be responsible for graphics and wayfinding signage. Richard Golber provides
design, costing, and fabrication expertise to streamline this effort that translates into savings for the
City.
O'Brien Lighting, Inc. will provide lighting design in conjunction with our local lighting representatives,
Municipal Lighting.
Bureau Veritas Certification North America, Inc. will handle geotechnical engineering and also
provide life safety services.
Schwebke-Shiskin and Associates, Inc., a long-standing partner of Kimley-Horn, will be responsible
for surveying.
Sensitive to the Pivotal Role of Meaningful Public Involvement Programs. Community consensus, derived
through creative engagement with the public, key stakeholders, and the City, will ultimately be the measure of
success for this project. Kimley-Horn and our partners, Kobi Karp and Communi katz, know how to get that
done. We designed the Miami public parks and streetscape and the Miami River Greenway now being
installed. The pivotal element for all projects was the consensus building effort that resulted in a groundswell of
support for the improvements. As your management team for the Heritage Park project, we will further refine
your vision through structured collaboration with the City and identified stakeholders.
Unparalleled Local and National Resources. Kimley-Horn has been providing multidisciplinary services to
municipal clients for more than 40 years. We are made up of more than 2,400 professionals and staff across
the country, including planners, landscape architects, civil engineers, utility engineers, roadway engineers,
environmental scientists, and artists. With nearly 800 employees in Florida and more than 260 in South Florida
alone, our ability to serve the City of Sunny Isles Beach is unparalleled.
Project Manager Committed to You. I may be reached in the office at (305) 673-2524, or on my mobile
telephone at (786) 253-9155, and via email at jack.perry@kimley-horn.com. You have my personal
commitment that we will dedicate all the appropriate resources of the Kimley-Horn team to the City of Sunny
Isles Beach.
I. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
31. SIGNATURE
1S-t L--4--
I ~ om
10/9/2007
33. NAME AND TITLE
Jerry W. Ingram, P.E., Senior Vice President/Principal
STANDARD FORM 330 (1/2004) PAGE 5
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
ARCHITECT - ENGINEER QUALIFICATIONS
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4.
Kimley-Horn and Associates, Inc. 1995
1. SOLICITATION NUMBER (If any)
07-08-01
DUNS NUMBER
969678226
2b. STREET
1691 Michigan Ave., Suite 400
2c. CITY
Miami Beach
5. OWNERSHIP
6a. POINT OF CONTACT NAME AND TITLE
Jack M. Perry. Project Manager / Sr. Landscape Architect
2e. ZIP CODE
33139
a. TYPE
Corporation
b. SMALL BUSINESS STATUS
No
6b. TELEPHONE NUMBER
305-535-7711
7. NAME OF FIRM (If block 2a IS a branch office)
APHC, Inc.
6c. E-MAIL ADDRESS
Jack. Perrv@kimley-horn.com
8b. YR. ESTABLISHED
8c. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c. No. of Employees a. Profile c. Reven ue
b. Discipline b. Experience Index Number
Code (l)FIRM (2) BRANCH Code (see below)
02 Administrative 274 4 Cl0 Commercial Building; (low rise); Shopping 3
08 CADD Technicians 200 2 EOl Ecological & Archeological Investigations 1
12 Civil Engineers 579 4 E02 Educational Facilities; Classrooms 1
15 Construction Inspectors 10 0 HO? Highways; Streets; Airfield Paving; Parking 2
39 Landscape Architects 67 9 H09 Hospitals & Medical Facilities 1
48 Project Managers 214 0 H11 Housing (Residential, Multifamily, 3
58 Technician/Analysts 355 8 101 Industrial Buildings; Manufacturing Plants 1
L03 Landscape Architecture 5
001 Office Building; Industrial Parks 3
P06 Planning (Site, Installation and Project) 3
R04 Recreational Facilities 1
S04 Sewage Collection, Treatment & Disposal 3
S13 Stormwater Handling & Facilities 1
T03 Traffic & Transportation Engineering 1
U02 Urban Renewals; Community Development 4
W03 Water SupplylTreaUDistrib 1
Other Employees 764 5
Total 2463 32
11. ANNUAL AVERAGE PROFESSIONAL SERVICES PROFESSIONAL SERVICES REVENUE INDEX NUMBER
REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million
(Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work 0 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
6 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
b. Non-Federal Work 5. $1 million to less than $2 million 10. $50 million or greater
C. Total Work 6
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
, "GN"UR' 15-r 1v--4--
I b
DATE
10/9/2007
c. NAME AND TITLE
Jerry W. Ingram, P.E., Senior Vice PresidenUPrincipal
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/1/2004
STANDARD FORM 330 (1/2004) PAGE 6
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1. SOLICITATION NUMBER (11 any)
ARCHITECT - ENGINEER QUALIFICATIONS 07-08-01
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 5. DUNS NUMBER
Kimley-Horn and Associates, Inc. 1968 118604768
2b. STREET 5. OWNERSHIP
4431 Embarcadero Dr. a. TYPE
2c. CITY 12d. STATE 12e. ZIP CODE Corporation
West Palm Beach FL 33407 b. SMALL BUSINESS STATUS
No
6a. POINT OF CONTACT NAME AND TITLE
Jerry Ingram, P.E. 7. NAME OF FIRM (11 block 2a IS a branch office)
APHC, Inc.
6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS
561-840-0228 Jerry.1 naram@kimlev-horn.com
8a. FORMER FIRM NAMEiS) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c. No. of Employees a. Profile c. Revenue
b. Discipline b. Experience Index Number
Code (1)FIRM (2) BRANCH Code (see below)
48 Project Managers 219 14 A06 Airports; Terminals; & Hangars; Freight 3
02 Administrative 275 29 B02 Bridges 3
12 Civil Engineers 557 24 Cl0 Commercial Building; (low rise); Shopping 2
15 Construction Inspectors 10 0 003 Desalinization (Process & Facilities) 2
08 CADD Technicians 200 11 EOl Ecological & Archeological Investigations 1
19 Ecologists 10 0 E09 Environmental Impact Studies. Assessments 3
42 Mechanical Engineers 4 1 E12 Environmental Remediation 2
47 Planners: Urban/Regional 49 5 F05 Forensic Engineering 1
57 Structural Engineers 38 7 GOl Garages; Vehicle Maintenance Facilities; 1
38 Land Surveyors 14 2 H01 Harbors; jetties; Piers; Ship Terminal 1
58 Technician/Analysts 350 25 HO? Highways; Streets; Airfield Paving; Parking 8
60 Transportation Engineers 230 11 101 Industrial Buildings; Manufacturing Plants 2
001 Office Building; Industrial Parks 1
P06 Planning (Site, Installation and Project) 6
R04 Recreational Facilities 3
S04 Sewage Collection, Treatment & Disposal 1
S09 Structural Design; Special Structures 3
S10 Surveying; Platting; Mapping; Flood Plain 3
S13 Stormwater Handling & Facilities 3
T03 Traffic & Transportation Engineering 6
Other Employees 506 40 W02 Water Resources; Hydrology; Ground Water 3
Total 2462 169 W03 Water Supply/TreaUDistrib 5
11. ANNUAL AVERAGE PROFESSIONAL SERVICES PROFESSIONAL SERVICES REVENUE INDEX NUMBER
REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100.000 6. $2 million to less than $5 million
(Insert revenue index number shown at right) 2. $100,000 to less than $250.000 7. $5 million to less than $10 million
a. Federal Work 3. $250.000 to less than $500.000 8. $10 million to less than $25 million
8 4. $500.000 to less than $1 million 9. $25 million to less than $50 million
b. Non-Federal Work 5. $1 million to less than $2 million 10. $50 million or greater
c. Total Work 8
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
, SOGNAWRE 15-t 1v--4-
DATE
10/9/2007
c. NAME AND TITLE
I '
Jerry W. Ingram, P.E., Senior Vice PresidenUPrincipal
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/1/2004
STANDARD FORM 330 (1/2004) PAGE 6
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1. SOLICITATION NUMBER (ltany)
ARCHITECT - ENGINEER QUALIFICATIONS 07-08-01
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 6. DUNS NUMBER
Kimley-Horn and Associates, Inc. 1983 192185130
2b. STREET 5. OWNERSHIP
5200 NW 33rd Ave., Suite 109 a. TYPE
2c. CITY 12d. STATE 12e. ZIP CODE Corporation
Fort Lauderdale FL 33309 b. SMALL BUSINESS STATUS
No
6a. POINT OF CONTACT NAME AND TITLE
Chris Barton, RLA, AICP 7. NAME OF FIRM (If block 2a is a branch office)
APHC, Inc.
6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS
954-535-5124 Ch ris. Barton@kimlev-horn.com
8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c. No. of Employees a. Profile c. Revenue
b. Discipline b. Experience Index Number
Code (1)FIRM (2) BRANCH Code (see below)
12 Civil Engineers 557 9 A06 Airports; Terminals; & Hangars; Freight 2
13 Communications Engineers 43 4 B02 Bridges 1
47 Planners: Urban/Regional 49 1 C10 Commercial Building; (low rise); Shopping 4
48 Project Managers 219 3 E01 Ecological & Archeological Investigations 1
58 Technician/Analysts 350 14 E02 Educational Facilities; Classrooms 1
60 Transportation Engineers 230 5 E09 Environmental Impact Studies, Assessments 1
F05 Forensic Engineering 1
H07 Highways; Streets; Airfield Paving; Parking 2
H10 Hotels; Motels 1
H11 Housing (Residential, Multifamily. 1
104 Intelligent Transportation Systems 3
L03 Landscape Architecture 1
001 Office Building; Industrial Parks 1
P06 Planning (Site, Installation and Project) 4
R03 Railroad and Rapid Transit 1
R04 Recreational Facilities 1
S04 Sewage Collection, Treatment & Disposal 1
S09 Structural Design; Special Structures 1
S13 Stormwater Handling & Facilities 1
T03 Traffic & Transportation Engineering 5
Other Employees 1014 16 U02 Urban Renewals; Community Development 1
Total 2462 52 W03 Water SupplyfTreaUDistrib 1
11. ANNUAL AVERAGE PROFESSIONAL SERVICES PROFESSIONAL SERVICES REVENUE INDEX NUMBER
REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100.000 6. $2 million to less than $5 million
(Insert revenue index number shown at right) 2. $100.000 to less than $250.000 7. $5 million to less than $10 million
a. Federal Work 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
4. $500.000 to less than $1 million 9. $25 million to less than $50 million
b. Non-Federal Work 6 5. $1 million to less than $2 million 10. $50 million or greater
C. Total Work 6
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
15-r~-4--
I '
a. SIGNATURE
DATE
10/9/2007
c. NAME AND TITLE
Jerrv W. Inqram, P.E., Senior Vice President/Principal
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/1/2004
STANDARD FORM 330 (1/2004) PAGE 6
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
ARCHITECT - ENGINEER QUALIFICATIONS
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 7.
Kimley-Horn and Associates, Inc. 1991
1. SOLICITATION NUMBER (It any)
07-08-01
DUNS NUMBER
010013618
2b. STREET
2601 Cattlemen Rd., Suite 500
5. OWNERSHIP
2c. CITY
Sarasota
2e. ZIP CODE
34232
a. TYPE
Corporation
6a. POINT OF CONTACT NAME AND TITLE
James Pankonin, RLA, ASLA
b. SMALL BUSINESS STATUS
No
6b. TELEPHONE NUMBER
941-379-7613
7. NAME OF FIRM (It block 2a is a branch office)
APHC, Inc.
E-MAIL ADDRESS
James. Pan kon in@kimley-horn.com
8b. YR. ESTABLISHED
8c. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c. No. of Employees a. Profile c. Revenue
b. Discipline b. Experience Index Number
Code (1)FIRM (2) BRANCH Code (see below)
02 Administrative 275 8 A06 Airports; Terminals; & Hangars; Freight 1
08 CADD Technicians 200 10 B02 Bridges 1
12 Civil Engineers 557 14 C10 Commercial Building; (low rise); Shopping 2
13 Communications Engineers 43 2 E01 Ecological & Archeological Investigations 3
15 Construction Inspectors 10 1 E02 Educational Facilities; Classrooms 1
38 Land Surveyors 14 0 E09 Environmental Impact Studies, Assessments 1
39 Landscape Architects 66 9 F05 Forensic Engineering 1
42 Mechanical Engineers 4 0 H01 Harbors; jetties; Piers; Ship Terminal 1
47 Planners: Urban/Regional 49 7 H07 Highways; Streets; Airfield Paving; Parking 4
48 Project Managers 219 11 Hll Housing (Residential, Multifamily, 6
58 Technician/Analysts 350 16 104 Intelligent Transportation Systems 1
L03 Landscape Architecture 3
001 Office Building; Industrial Parks 1
P06 Planning (Site, Installation and Project) 7
R04 Recreational Facilities (Parks; Marinas; ect.) 1
S04 Sewage Collection, Treatment & Disposal 2
S09 Structural Design; Special Structures 1
S13 Stormwater Handling & Facilities 1
T03 Traffic & Transportation Engineering 2
U02 Urban Renewals; Community Development 1
Other Employees 675 7 W02 Water Resources; Hydrology; Ground Water 1
Total 2462 85 W03 Water Supply/TreaUDistrib 3
11. ANNUAL AVERAGE PROFESSIONAL SERVICES PROFESSIONAL SERVICES REVENUE INDEX NUMBER
REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million
(Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
7 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
b. Non-Federal Work 5. $1 million to less than $2 million 10. $50 million or greater
C. Total Work 7
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
15-r ~J...--
I '
a. SIGNATURE
DATE
10/9/2007
c. NAME AND TITLE
Jerry W. Ingram, P.E., Senior Vice President/Principal
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/1/2004
STANDARD FORM 330 (1/2004) PAGE 6
'.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1. SOLICITATION NUMBER (lfany)
ARCHITECT - ENGINEER QUALIFICATIONS 07-08-01
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 8. DUNS NUMBER
Kimley-Horn and Associates, Inc. 1967 061099131
2b. STREET 5. OWNERSHIP
3001 Weston Pkwy. (Cary 27513-2301), P.O. Box 33068 a. TYPE
2c. CITY 12d. STATE 12e. ZIP CODE Corporation
Raleigh NC 27636-3068 b. SMALL BUSINESS STATUS
No
6a. POINT OF CONTACT NAME AND TITLE
Dean Penny, P.E. 7. NAME OF FIRM (If block 2a is a branch office)
APHC, Inc.
6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS
919-677 -2090 Dea n. Pennv@kimlev-horn.com
8a. FORMER FIRM NAME(S) (If anv) 8b. YR. ESTABLISHED 8c. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c. No. of Employees a. Profile c. Revenue
b. Discipline b. Experience Index Number
Code (1)FIRM (2) BRANCH Code (see below)
02 Administrative 275 31 B02 Bridges 3
08 CADD Technicians 200 14 Cl0 Commercial Building; (low rise); Shopping 6
12 Civil Engineers 557 16 E01 Ecological & Archeological Investigations 4
13 Communications Engineers 43 5 E02 Educational Facilities; Classrooms 2
19 Ecologists 10 3 E05 Elevators; Escalators; People-Movers 5
39 Landscape Architects 66 7 E12 Environmental Remediation 4
47 Planners: Urban/Regional 49 1 F05 Forensic Engineering 3
48 Project Managers 219 15 G01 Garages; Vehicle Maintenance Facilities; 5
57 Structural Engineers 38 0 H07 Highways; Streets; Airfield Paving; Parking 6
58 Technician/Analysts 350 5 H10 Hotels; Motels 2
60 Transportation Engineers 230 35 H11 Housing (Residential. Multifamily. 2
104 Intelligent Transportation Systems 5
L03 Landscape Architecture 3
001 Office Building; Industrial Parks 4
P06 Planning (Site, Installation and Project) 7
R04 Recreational Facilities 1
S04 Sewage Collection, Treatment & Disposal 4
S09 Structural Design; Special Structures 2
S13 Stormwater Handling & Facilities 1
T03 Traffic & Transportation Engineering 7
Other Employees 425 45 U02 Urban Renewals; Community Development 2
Total 2462 177 W03 Water SupplylTreaUDistrib 4
11. ANNUAL AVERAGE PROFESSIONAL SERVICES PROFESSIONAL SERVICES REVENUE INDEX NUMBER
REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million
(Insert revenue index number shown at right) 2. $100,000 to less than $250.000 7. $5 million to less than $10 million
a. Federal Work 3 3. $250,000 to less than $500.000 8. $10 million to less than $25 million
b. Non-Federal Work 8 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
5. $1 million to less than $2 million 10. $50 million or greater
C. Total Work 8
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
15-t~4-
I'
a. SIGNATURE
DATE
10/9/2007
c. NAME AND TITLE
Jerry W. Ingram, P.E., Senior Vice PresidenUPrincipal
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/112004
STANDARD FORM 330 (1/2004) PAGE 6
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1. SOLICITATION NUMBER (lIany)
ARCHITECT - ENGINEER QUALIFICATIONS 07-08-01
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 9. DUNS NUMBER
Kimley-Horn and Associates, Inc. 1977 603783739
2b. STREET 5. OWNERSHIP
10521 S.w. Village Center Dr., Suite 103 a. TYPE
2c. CITY 12d. STATE 12e. ZIP CODE Corporation
Port St. Lucie FL 34987 b. SMALL BUSINESS STATUS
No
6a. POINT OF CONTACT NAME AND TITLE
Ted Kendziora 7. NAME OF FIRM (II block 2a is a branch office)
APHC, Inc.
6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS
772-345-3822 Ted. Kendziora@kimlev-horn.com
8a. FORMER FIRM NAMEIS) (If anvJ 8b. YR. ESTABLISHED 8c. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c. No. of Employees a. Profile c. Revenue
b. Discipline b. Experience Index Number
Code (1) FIRM (2) BRANCH Code (see below)
12 Civil Engineers 557 3 A03 Agricultural Development; Grain Storage; 1
19 Ecologists 10 1 C10 Commercial Building; (low rise); Shopping 1
44 Oceanographers 1 0 E01 Ecological & Archeological Investigations 2
48 Project Managers 219 4 E09 Environmental Impact Studies. Assessments 2
58 Technician/Analysts 350 10 E12 Environmental Remediation 1
F05 Forensic Engineering 1
H01 Harbors; jetties; Piers; Ship Terminal 2
H07 Highways; Streets; Airfield Paving; Parking 1
H10 Hotels; Motels 1
H11 Housing (Residential, Multifamily, 3
L03 Landscape Architecture 1
001 Office Building; Industrial Parks 1
P06 Planning (Site, Installation and Project) 4
R04 Recreational Facilities 1
T03 Traffic & Transportation Engineering 2
Other Employees 1325 19
Total 2462 37
11. ANNUAL AVERAGE PROFESSIONAL SERVICES PROFESSIONAL SERVICES REVENUE INDEX NUMBER
REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million
(Insert revenue index number shown at right) 2. $100.000 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work 3. $250.000 to less than $500,000 8. $10 million to less than $25 million
5 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
b. Non-Federal Work 5. $1 million to less than $2 million 10. $50 million or greater
c. Total Work 5
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
15-t L--4--
I '
a. SIGNATURE
DATE
10/9/2007
c. NAME AND TITLE
Jerry W. Ingram, P.E., Senior Vice President/Principal
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/112004
STANDARD FORM 330 (1/2004) PAGE 6
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1. SOLICITATION NUMBER (lfany)
ARCHITECT - ENGINEER QUALIFICATIONS 07-08-01
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 10.DUNS NUMBER
Kimley-Horn and Associates, Inc. 2002 969678226
2b. STREET
9130 S. Dadeland Blvd., Suite 102
5. OWNERSHIP
2c. CITY
Miami
2e. ZIP CODE
33156
a. TYPE
Corporation
b. SMALL BUSINESS STATUS
No
6a. POINT OF CONTACT NAME AND TITLE
Burt Baldo, P.E.
6b. TELEPHONE NUMBER
305-670-9120
7. NAME OF FIRM (If block 2a is a branch office)
APHC, Inc.
6c. E-MAIL ADDRESS
Bu rt. Baldo@kimlev-horn.com
8b. YR. ESTABLISHED
8c. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c. No. of Employees a. Profile c. Revenue
b. Discipline b. Experience Index Number
Code (1)FIRM (2) BRANCH Code (see below)
08 CADD Technicians 200 1
12 Civil Engineers 557 1
48 Project Managers 219 1
58 Technician/Analysts 350 4
Other Employees 1136 8
Total 2462 15
11. ANNUAL AVERAGE PROFESSIONAL SERVICES PROFESSIONAL SERVICES REVENUE INDEX NUMBER
REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million
(Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
b. Non-Federal Work 4. $500.000 to less than $1 million 9. $25 million to less than $50 million
5. $1 million to less than $2 million 10. $50 million or greater
C. Total Work
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE
DATE
15-t ~-4--
I "
10/9/2007
c. NAME AND TITLE
Jerry W. Ingram, P.E., Senior Vice PresidenUPrincipal
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/1/2004
STANDARD FORM 330 (1/2004) PAGE 6
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1. SOLICITATION NUMBER ({{any)
ARCHITECT - ENGINEER QUALIFICATIONS
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER
BUREAU VERITAS NORTH AMERICA, INC. 2003 14778116
2b. STREET
10125 NW 116lh Way, Suite No. 18
2c. CITY
Miami
5. OWNERSHIP
a. TYPE
CORPORA nON
2e. ZIP CODE
33178
b. SMALL BUSINESS STATUS
NONE
6a. POINT OF CONTACT NAME AND TITLE
ALFREDO BUDIK, P .E. - VICE PRESIDENT
7. NAME OF FIRM (If block 2a is a branch office)
6b. TELEPHONE NUMBER
786-248-3180
6c. E-MAIL ADDRESS
Alfredo.budik@us.bureauveritas.com
8b. YR. ESTABLISHED
1985
8c. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. c. Revenue
a. Function b. Discipline c. No. of Employees Profile b. Experience Index
Code (1)FIRM (2) BRANCH Code Number
55 SOilS ENGINEER X GEOTECHNICAL ENGINEERING AND 8
CONSTRUCTION MATERIALS TESTING
Total I I
11. ANNUAL AVERAGE PROFESSIONAL SERVICES p ,,,,ncy
REVENUES OF FIRM I
FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million 10 less Ihan $5 million
(Insert revenue Index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work 3. $250.000 to less than $500,000 B. $10 million 10 less Ihan $25 million
b. Non-Federal Work 4. $500,00010 less Ihan $1 million 9. $25 million to less Ihan $50 million
5. $1 million 10 less than $2 million 10. $50 million or greater
c. Total Work
12. AUTHORIZED REPRESENTATIVE
The foregoing Is a statement of facts.
a. SIGNATURE
b. DATE
10/4/07
ALFREDO UDIK, P.E. - VICE PRESIDENT
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/1/2004
STANDARD FORM 330 (1/2004) PAGE 6
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1. SOLICITATION NUMBER (lfany)
ARCHITECT - ENGINEER QUALIFICATIONS 07-08-01
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER
Communikatz, Inc. 1983
2b. STREET 5. OWNERSHIP
4141 NE Second A venue, Suite 101 D a. TYPE
2c. CITY 12d. STATE 12e. ZIP CODE Corporation
Miami FL 33137 b. SMALL BUSINESS STATUS
6a. POINT OF CONTACT NAME AND TITLE
Ric Katz, President 7. NAME OF FIRM (If block 2a is a branch office)
6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS
305-573-4455 rkatz@communikatz.com
8a. FORMER FIRM NAMEIS) (If an v) 8b. YR. ESTABLISHED 8c. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. c. Revenue
a. Function b. Discipline c. No. of Employees Profile b. Experience Index
Code (l)FIRM (2) BRANCH Code Number
Public Inv Public Involvment 5 Pub Public Involvement/Community, governmental & 2
Community relations
Total T 1
11. ANNUAL AVERAGE PROFESSIONAL SERVICES P
REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100.000 6. $2 million to less than $5 million
(Insert revenue index number shown at right) 2. $100.000 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
b. Non-Federal Work 3 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
5. $1 million to less than $2 million 10. $50 million or greater
c. Total Work 3
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE
c- *-~1;-
b. DATE
October 2, 2007
c. NAME AND TITLE
Eric S. Katz, President
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/1/2004
STANDARD FORM 330 (112004) PAGE 6
I.
I
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1. SOLICITATION NUMBER (II any)
ARCHITECT - ENGINEER QUALIFICATIONS
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER
Franyie Engineers, Inc. 1979
2b. STREET 5. OWNERSHIP
10610 N.W. 27 St. a. TYPE
2c. CITY 12d. STATE 12e. ZIP CODE Sub Chapter-S
Miami FL 33172 b. SMALL BUSINESS STATUS
6a. POINT OF CONTACT NAME AND TITLE
Antonio Franyic, Jr. - Vice President 7. NAME OF FIRM (II block 2a is a branch office)
6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS
305-592-1360 tonyjr@franyie.com
8a. FORMER FIRM NAME(S) (If an v) 8b. YR. ESTABLISHED 8c. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. c. Revenue
a. Function b. Discipline c. No. of Employees Profile b. Experience Index
Code (1)FIRM (2) BRANCH Code Number
42 Mechanical Engineer 1
21 Electrical Engineer 1
48 Project Manager 1
Total 3 I I
11. ANNUAL AVERAGE PROFESSIONAL SERVICES P DC\II::" , IC INn~)( NIIM~~R
REVENUES OF FIRM I
FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million
(Insert revenue index number shown at right) 2. $100,000 to less than $250.000 7. $5 million to less than $10 million
a. Federal Work 3. $250,000 to less than $500.000 8. $10 million to less than $25 million
b. Non-Federal Work 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
5. $1 million to less than $2 million 10. $50 million or greater
C. Total Work
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE
Antonio Fran ie, Jr.
c. NAME AND TITLE
Antonio Franyie, Jr.
b. DATE
October 8, 2007
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/1/2004
STANDARD FORM 330 (1/2004) PAGE 6
· AUG-21-2007
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
22:47 From:
To: 14078988400
Page:2/8
1. SOLICITATION NUMBER (lfany)
ARCHITECT - ENGINEER QUALlFICA TrONS
PART 11- GENERAL QUALIFICATIONS
(/f a firm has branch offlces. complete for each specific branch office seeking work)
2a. FIRM(OK~cl2~FICEp~~. ... .. 3 Y,;;STABl.ISHED J 4. DUNSNU.MBE~
2H-~EW ~ 5. OWNERSHIP
_\~O D \l \tJ..JJ ~e-
20. blTY
~"C-\-i
&s. POINT OF CON'T: CT NflME AND TI'l'l!:
3~'+%
II. iYPE
2e. iip CODE
~-~ ~pO-P.
b.SMALlBU N~SS ATUS
\L \( ,\-\ ka...O
!lb. TEl Ef'HONE NUMBER
'5tc \. '4SS . OS, <0
~. ro.RMER FIRM NAME(S) {If llnyJ
7. NAME OF FiRM (It bloClt 2.> ir. " b'lVlCh ~J
. PUNC.,\?F\L-
6c. lE-MAll ADDRESS
8b. YR. EST....BlISHED
8C. pUNS NU"'8eR
9. EMPLOYEES BY DISCtPLlNe 10. PROFILE O,F FIRM'S EXPERIENCE ANO
ANNUAL AVERAGE REVENUE FOR LAST 5 YeARS
.. '.. . c: Revenue
a. Function C No. of Employees I.
b. Di~plil1e Profile b.Experience Index
Code (1) rlRM (:2) BAANCH Co<le Number
.. .... ..
o. , . .
.. .. Part iI: ~ --
.... ...-
.. ..- y OU 1U\l~~ fill out this (onn for tach office ~
from which you: have. proposed staff for this I- -.-
....- projed.For'exa~plc;.ifKimley-Horn is using
..- staff fru~ bo.t~ (nJr.J'a~pa arid West Palm
. - I- .
Beac.. _offices then ~~ have ~u fill out this form
.. '..- twic~D.ce'for "ra:mp~ and c.inte for West
,. ..... Palm Beach. '. ... .
. .
. .
0 " ... , i
""
. . ... .-
,.
Total .. .. I I
"
'-
11. ANNUAL AVERAGE PROFeSSIONAL S!:RVlces P.R.OEE~~I ,...^' : OC"':"'UE INnFX NIIMRFR
REVENUES Or FIRM I
FOR LAST 3 YCARS 1. ltlliti itlan $100,000 (;. $2 milliOn To less than $5 million ..
(lrtsort revenue mdtJJt. number shown at right)
'l $100,000 to leu than $25D,000 7. $S mmion to less Vlan $10 miJIlQll
a. Federal WOrk 3. $250.000 10 leu than $500,000 8 $1 0 minion to less Vlan $25 million
- .. 4. ~500,OOu 10 1tlS$ Ulan $1 million Q. $25 mUlion to Ie$$ than $!a million
b. No~F.d8ral Wo",
o. ~j'*4fk . . 5. $1 million 10 Ic~s thlln $2 minion 10. $50 million or greater
~ UI... -- 1 <!. AUTHORIZED REPRESENTATIVE
l. ',- The foregoing is a statement of facts.
i. SIGNA I'(J (f .. .. ..-
b. lJJ\TE
c NAME AND Tfl1.E
~,u-\ Itt~ ~ t> l. ec.A2-
AUTHORlZeO FOR lOCAl. KEPROOLJC ON f
MANDATORY use CATE OF t-ORM 5/112004
L\O.O<?.O"l
P L.\ ~ C\ ~ ~L
$TANDARO FORM 330 (112004) PAGE 6
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
,.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1. SOLICITATION NUMBER (It any)
ARCHITECT - ENGINEER QUALIFICATIONS 07-08-01
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER
Hall Fountains, Inc. 1965 03-227 -5182
2b. STREET 5. OWNERSHIP
5500 N.w. 22nd Avenue a. TYPE
2c. CITY 12d. STATE 12e. ZIP CODE S type corporatoin
Fort Lauderdale FL 33309 b. SMALL BUSINESS STATUS
6a. POINT OF CONTACT NAME AND TITLE
Todd Hall- Controls Manager 7. NAME OF FIRM (It block 2a is a branch office)
6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS
954.484.8530 todd@hallfountains.com
8a. FORMER FIRM NAMEIS) (If anv! 8b. YR. ESTABLISHED 8c. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. c. Revenue
a. Function b. Discipline c. No. of Employees Profile b. Experience Index
Code (1)FIRM (2) BRANCH Code Number
..
Production Manager 1
Design/Engineering Manager 1
Controls Manager 1
Total 3 I I
11. ANNUAL AVERAGE PROFESSIONAL SERVICES P
REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million
(Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work 1 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
1 4. $500.000 to less than $1 million 9. $25 million to less than $50 million
b. Non-Federal Work 5. $1 million to less than $2 million 10. $50 million or greater
c. Total Work 1
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE
Todd Hall
b. DATE
October 8, 2007
c. NAME AND TITLE
Todd Hall
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/1/2004
STANDARD FORM 330 (1/2004) PAGE 6
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
ARCHITECT - ENGINEER QUALIFICATIONS
PART 11- GENERAL QUALIFICATIONS
Ilf a film nas orancl) offices complete for each specifiC tJrClnch office secKmq ,vork I
I . .~... (il-J~H~t\~.( H :FF([: '.:.'.F 'f,\qiS.....8 1~)i1f1
';'ll('I'.\ '1<"1 '1lJ"~RFR '
t "J'~'~ '.H-H-f..
Kobl Kurp ;\rctilrecturt; (Incl ,nterior Deslgr' Inc.
I \)\)..j
.~ q~ ~- ~ ..
5 OWNERSHIP
2915 Biscoyw; Blvc j, 51) Ie 200
('IIY
.'.'l'!
. . l~ i.4. ':' r:
liP (;CJOl
I llllllL'd 1,lbllit: ('I)rp(\r~lll(111
MiClrri
FL
33131
~)r.1/.. t 81 JSI,"Jf- SS S r /:.. r JS
,I I.JOIN" OF ~O"~I/.""l. r 'J~\-.'F ,....~.jf) Tin.:
11,[
Kobi Korp, PrinClpClI
NM.n. (., ,~..,
v rELEPf'O~E Nl)I.mr;l
3055731818
! '.~Ail AtJDRf- S5
koblkiHn:g;koblkaro com
Ilia
~,l ;"OR'.'rR t-p~'.1 ~JA'.'f- 5, 'Jr,j
't .R 'SI:.BlISr'~c;
n/il
- D'J'IS 'II ','Bf','l
ilia
rl'ct
') EMPl OYFFS llY DISCIPLINE
10 PROFILE OF FIRM S FXPEHIENCE AND
ANNUAL AVERAGE REVENUE FOR lAST ') YFAf~S
J:de
'" {i '-, ~ .'..
'.JJ _I f-"';'I:)',t:'f:l5
f "',\ . fJRf\,'I(.'~
R:("..enu~~
1 f ,....".'C,..
p ',,-.
..... l.::>!f (....,..-.
... ~I.! l
~. :I!
~. 'l"~(:r
J5
A 'chltecture
'30
GO
Tolal 50 60
11 f\NNlJAL AVERAGE PROFESSIONAL SERVICES
REVENUES OF FIRM
FOR LAS T 3 YFARS
I{,nser: re..-e,"I,e ,rce. '1u"'O,~r sro....) .J,' r"qi::,
PRmESSIONM SERVICES REVENUE INDE'X NI)MH~R
a F ecef .11 \//0'-..
1 Less t~ar S 1:)0 coe
S 1 cc ceo :Q ess l"ar ;25J ceo
;250 ceo:Q eSSI"ar ;50J -CCO
.1 sse;) coo to ess t."an 51 ~l 'en
5' !TIt lion ~o ess tnar 52 r~1 II c~
-3 52 mdllO'" ta 1':5S man 55........, Or'
55 '~,,~hor' 10 less tt'd~ 510 IT' c~
5' C "" en:o ess tn;tn S25 '''1, en
9 525'T' en ~o ess tnar 55G........ en
1 J '550 -r en or g'C'c1It!f
d
12. AUTHORIZED REPRESENT A TlVE
The forego,ng '5 a statement of facts
tl DAlE'
c
o T1f(p61 mP I A~rr~ October 8, 2007
AUTHORIZED FOR LOCAL REPRODUCTION
MANDA TORY USE DA TE OF FORM 5,1 2C04
STANDARD FORM 330 (12004) PAGE 6
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
ARCHITECT - ENGINEER QUALIFICATIONS
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
1. SOLICITATION NUMBER (lfany)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER
O'Brien Lighting, Inc 5
2b. STREET 5. OWNERSHIP
2601 South Bayshore Drive, Suite 245 a. TYPE
2c. CITY 12d. STATE 12e. ZIP CODE Corporation
Miami FL 33133 b. SMALL BUSINESS STATUS
6a. POINT OF CONTACT NAME AND TITLE Active, good standing
Michael O'Brien, Lead Designer 7. NAME OF FIRM (If block 2a is a branch office)
6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS
305-774-0413 mike@obrienlighting.com
8a. FORMER FIRM NAMECS) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. c. Revenue
a. Function b. Discipline c. No. of Employees Profile b. Experience Index
Code (1)FIRM (2) BRANCH Code Number
Lighting Design and Consultation 1
(do not have Function code)
02 Administrative 2
08 CADD technician 2
Total I I
11. ANNUAL AVERAGE PROFESSIONAL SERVICES P INm:)( NI IMI'lI=R
REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100.000 6. $2 million to less than $5 million V
(Insert revenue index number shown at right) 2. $100.000 to less than $250.000 7. $5 million to less than $10 million
a. Federal Work 3. $250.000 to less than $500.000 8. $10 million to less than $25 million
b. Non-Federal Work 4. $500.000 to less than $1 million 9. $25 million to less than $50 million
5. $1 million to less than $2 million 10. $50 million or greater
c. Total Work
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE
Michael O'Brien
b. DATE
October 8, 2007
c. NAME AND TITLE
Michael O'Brien, Lead Designer
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/112004
STANDARD FORM 330 (1/2004) PAGE 6
~--
I-
-
-
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
-
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1. SOLICITATION NUMBER (Ifany)
RFQ No. 08-07-01
PART II - GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR 4. DUNS NUMBER
ESTABLISHED
Schwebke-Shiskin & Associates, Inc. 1950
2b. STREET
11941 S. W. l44th Street (Branch) a. TYPE
Corporation
2c. CITY 12d. STATE 12e. ZIP CODE b. SMALL BUSINESS STATUS
Miami FL 33186
6a. POINT OF CONTACT NAME AND TITLE
Alfonso C. Tello. P.E., P.L.S.
6b. TELEPHONE NUMBER I 6c. EMAIL ADDRESS
954-435-70 I 0 atellouv.shiskin.com
8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER
N/A
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c. No. of Emplovees
Code (1)FIRM (2)
02 Administrative 4 A05 I
08 CADD Technician 4 I C07 I
12 Civil Engineer 5 CIO I
38 Land Survevor 29 II D04 I
D06 I
E09 I
Ell 1
H07 4
HII 2
106 I
L04 I
L06 I
001 3
P06 I
P07 I
R03 I
R04 I
RII I
S04 I
S07 I
SI3 I
W02 I
Total 15 W03 I
11. ANNUAL AVERAGE
PROFESSIONAL
SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS
(Insert revenue Index number shown at
right)
a. Federal Work 0
b. Non-Federal Work 6
c. Total Work 6
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
I b. DATE October 05, 2007
a. SIGNATURE
c. NAME AND TITLE
Alfonso C. Tello, P.E., P.L.S., President
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 6/2004
STANDARD FORM 330 (112004) PAGE 6
I.
.
.
.
ie
I.
e
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
.
.
,.
I.
.
.
.
.
.
.
.
.
.
1. SOLICITATION NUMBER (If any)
V A-786A-RI-06-0033
PART 11- GENERAL QUALIFICATIONS
Ira firm has branch ottice~COf1J fete for each s ecificbranch ottiC€! seekin work.
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR
[SWEENEY & ASSOCIATES, INC.] ESTABLISHED
[1997]
2b. STREET
[38730 Sky Canyon Drive, Suite C]
2c. CITY
[Murrieta]
6a. POINT OF CONTACT NAME AND TITLE
[Daniel L. ZumMallen, Vice President]
6b. TELEPHONE NUMBER
[951-461-6830]
8a, FORMER FIRM NAME(S) (If any)
[Insert]
4. DUNS NUMBER
[01-252-1956]
5. OWNERSHIP
2e. ZIP CODE
[92563]
a. TYPE
[S Cor I
b. SMALL BUSINESS STATUS
7. NAME OF FIRM (If block 2a is a branch
office)
6c. E-MAIL ADDRESS
[dzummallen@sweene assoc.com]
9. EMPLOYEES BY DISCIPLINE
a. Function
Code
c. No. of Employees
a. Profile
Code
b. Discipline
(2)
BRANCH
(1) FIRM
02
08
48
15
3
8
5
I
Other Em 10 ees
Total
11. ANNUAL AVERAGE PROFESSIONAL
SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS
(Insert revenue index number shown at ri ht)
1
5
5
1.
2.
3.
4.
5.
Less than $100.000
$100,000 to less than $250,000
$250,000 to less than $500,000
$500,000 to less than $1 million
$1 million to less than $2 million
6. $2 million to less than $5 million
7. $5 million to less than $10 million
8. $10 million to less than $25 million
9. $25 million to less than $50 million
10. $50 million or greater
a. Federal Work
b. Non-Federal Work
c. Total Work
10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
c. Revenue
Index
Number
(see below)
I
2
2
I
1
I
I
8b.YR
ESTABLISHED
[1990]
b. Experience
C02
CIO
E02
F02
GOl
H07
H09
Hit
001
R03
R04
8c. DUNS NUMBER
2
2
a. SIGNATURE
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
~J~aL
PROFESSIONAL SERVICES REVENUE INDEX NUMBER
b. DATE
October 8, 2007
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1. SOLICITATION NUMBER (II any)
ARCHITECT - ENGINEER QUALIFICATIONS 07-08-01
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER
URBANOMICS, Inc. 1991
2b. STREET 5. OWNERSHIP
13000 Sawgrass Village Circle, Suite 38 a. lYPE
2c. CllY 2d. STATE 2e. ZIP CODE Corporation
Ponte Vedra Beach FL 32082 b. SMALL BUSINESS STATUS
6a. POINT OF CONTACT NAME AND TITLE
Kenneth H. Creveling, President 7. NAME OF FIRM (II block 2a is a branch office)
6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS
904-280-9070 URBANOMIX@aol.com
8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. c. Revenue
a. Function b. Discipline c. No. of Employees Profile b. Experience Index
Code (1)FIRM (2) BRANCH Code Number
20 Urban Economist 1 Market and financial analyses 2
47 Urban Planner 1 Economic and fiscal impact analyses 1
Business and strategic planning 1
Total 2 I I
11. ANNUAL AVERAGE PROFESSIONAL SERVICES P DC"C." II~A~I=R
REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million
(Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work Not applicable 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
3 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
b. Non-Federal Work 5. $1 million to less than $2 million 10. $50 million or greater
c. Total Work 3
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE
/s/ Kenneth H. Creveling
c. NAME AND TITLE
Kenneth H. Creveling, President
b. DATE
October 9,2007
.
.
.
.
I.
.
i.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR
OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted
to City of Sunny Isles Beach
by Richard W. Mercer, Senior Vice President
for Kirnley-Horn and Associates, Inc.
whose business address is
3660 Maguire Blvd., Suite 200
Orlando, FL 32803
and (if applicable) its Federal Employer Identification Number (FEIN) is
56-0885615
(If the entity had no FEIN, include the Social Security Number of the individual signing this sworn
statement:
2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes,
means a violation of any state or federal law by a person with respect to and directly related to the
transaction of business with any public entity or with an agency or political subdivision of any other
state or of the United States, including, but not limited to, any bid or contract for goods or services
to be provided to any public entity or an agency or political subdivision of any other state or of the
United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or
material misrepresentation.
3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287 .133(I)(b), Florida
Statutes means a finding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial court of record relating to charges brought by
indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry of a
plea of guilty or nolo contenders.
4. I understand that an "affiliate" as defined in Paragraph 287.133(I)(a), Florida Statutes, means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the management of the
entity and who has been convicted of a public entity come. The term "affiliate" includes those
officers, directors, executives, partners, shareholders, employees, members, and agents who
are active in the management of an affiliate. The ownership by one person of shares
constituting a controlling interest in another person, or a pooling of equipment or income
among persons when not for fair market value under an arm's length agreement, shall be a
prima facie case that one person controls another person. A person who knowingly enters
into a joint venture with a person who has been convicted of a public entity crime in Florida
during the preceding 36 months shall be considered an affiliate.
5. I understand that a "person" as defined in Paragraph 287.133(1)( e), Florida Statutes, means any
natural person or entity organized under the laws of any state or of the United States with the
legal power to enter into a binding contract and which bids or applies to bid on contracts for the
provision of goods or services let by a public entity, or which otherwise transacts or applies to
transact business with a public entity. The term "person" includes those officers, directors,
executives, partners, shareholders, employees, members, and agents who are active in
management of any entity.
I.
.
,.
.
.
I.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6. Based on information and belief, the statement which I have marked below is true in a relation
to the entity submitting this sworn statement. (Please indicate which one (1) of the following
three (3) statements is applicable.)
~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of a
public entity crime within the past 36 months.
_(2) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of a
public entity crime within the past 36 months.
_(3) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or agents who are active in management of the entity, or any affiliate of
the entity has been charged with and convicted of a public entity crime within the past 36 months.
However, there has been a subsequent proceeding before a Hearing Officers of the State of
Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer determined
that it was not in the public interest to place the entity submitting this sworn statement on the
convicted vendor list. (Attached is a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER
FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THE PUBLIC
ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE
CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT
ENTERED INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM
REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN
EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA
~TUTES FOR THE CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED
HIS FORM.
rdarq 0. M/~ Richard W. Mercer
SIGNA TUR1?70F AFFIANT (Printed or Typed Legal Name of Affiant)
State of FL County of Orange
Sworn to and subscribed before me this <f>~ day of 0 c..:+-o bey
Rl ~y-ul W. M~e ex
~M~ Cl~~
Notary's Name Printed, Stamped or Typed
,2007 by
Notary Seal:
Notary Public State of Florida
Marcia A Come!ison
My Commission 00450796
Expires 09/11/2009
Personally Known:
v
,!!-"y p".
~~'1,
. .
.- ..
~ '-- ':!:J
"""') 0, t\.o~
or Produced Identification
Identification Produced
,--
.
.
.
.
.
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
NON-COLLUSIVE AFFIDA VIT
State of
Florida
County of
Orange
Richard W. Mercer, Senior Vice President
being first duly sworn, deposes and
says that:
(1) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully informed respecting the preparation and contents of the attached Bid and of all
pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded, conspired, connived
or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a collusive or sham
Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from
bidding in connection with such Work; or have in any manner, directly or indirectly, sought by
agreement or collusion, or communication, or conference with any Bidder, firm, or person to fix the
price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost
elements of the Bid price or the Bid price of any other Bidder, or to secure through any collusion,
conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach,
Florida, or any person interested in the proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any
c . n, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its
~ge~ ' representative owners, employees or parties in interest, including this Affiant.
(r~ . ichard W. Mercer
SIGNA TUR OF AFFI NT (Printed or Typed Legal Name of Affiant)
State of FL County of Orange
Sworn to and subscribed before me this ~'tb.
day of 0 G-\-Q bey-
, 2007 by
R\~v~ W. ffiuc vr
~~Q~~
Notary's Name Printed, Stamped or Typed
Personally Known: / or Produced Identification
Notary Seal:
/- o~>1'v ~-~7arf Public State of Flonda
: ..J1 ': MarCia A Comelison
~ -~ ': l My Commission DD450796
'} 0, ,,-0 Expires 0911112009
Identification Produced
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
.
.
.
.
,.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
FLORIDA DEPARTMENT OF STATE
Division of Corporations
April 17, 2007
KIMLEY-HORN AND ASSOCIATES, INC.
P.O. BOX 33068
RALEIGH, NC 27636-3068
SUBJECT: KIM LEY -HORN AND ASSOCIATES, INC.
DOCUMENT NUMBER: 821359
In compliance with the request on your 2007 Annual ReportlUniform Business
Report, the certificate of status for the subject corporation is enclosed.
Should you have any questions regarding this matter, please telephone (850) 488-
9000.
Division of Corporations
P.O. BOX 1500 - Tallahassee, Florida 32302
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
~tate of Jlflorib
c:r- ~~ a
-, 9t, "'"
c' . \ 1
;Munro :~
.%- a~t~i::fJr6 rL/ldtv" //fe /VOOkUo./kJ. if.
/c /,(i, /,_",1'&0 d',oup4' a f7h:,ft.;MMaAf' 3:-!?,/ur~
ngrneers
Inc.
~ .9.i'<</<</..... /0 o~ "'~~_r~ ~NV'C""
ea' wuu", 'i!i%'V"'- 471. g;~;m ~t'l:rk.,;.
AUDIT NO.: 0709- 002501
CERTIFICATE OF AUTHORIZATION NUMBER: 696
EXPIRATION: 2B-FEB-09
DISPLAY AS REQUIRED BY LAW
5T A TE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
BOARD OF LANDSCAPE ARCHITECTURE SEQ#L05110201904
LICENSE NBR
!11 02 2005 050357211 LCC0002l9
The LANDSCAPE ARCHITECT BUSINESS
Named below HAS REGISTERED
Under the provisions of Chapter 481 FS.
Expiration date: NOV 30, 2007
AC.
KIMLEY-HORN AND ASSOCIATES INC
POBOX 33068
RALEIGH NC 276363068
JEB BUSH
GOVERNOR
DISPLAY AS REOUIRED BY LAW
SIMONE MARSTILLER
SECRETARY
AC' 3 0 813 9 4
STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
BOARD OF PROF SURVEYORS & MAPPERS 5EQ#L07021900762
.7l. .:"'t":'~('I.t:I:.1:_LICENSE NBR
102/19/20071060546594 ILB696
The SURVEYING & MAPPING BUSINESS
Named below IS CERTIFIED
Under the provisions of Chapter 472 FS.
Expiration date: FEB 28, 2009
KIMLEY-HORN & ASSOC INC
3001 WESTON PKWY
CARY NC 27513-2301
CHARLIE CRIST
GOVERNOR
DISPLAY AS REOUIRED BY LAW
S I A rE: or f I ORIOA
HOLLY BENSON
SECRETARY
~I .
'!'_:~/\L !,~.:rrr F BU!l~t1ES:~ i\rl[ l'R. FE. ~I~JAL :~~. :1) .A""10N
hlAH'-) 'F rR{)F"E'~;}rnNAr ~f.~ ,I.uI;l:-::'1' SFQnJ.(.t JII).
"\1 .:'\1"':1: I 'I:I=-'~L ('~;~J~;E ~JBR
) I illb .;.OOt) Ob :10 1.;f)'1
Th". ;r:OLU(;Y BUS r Nr:S~
:IJlI~..1 ht:ol('W IS 'F-:R~'
"nd~'r t n., ~l )'.1 II )I1
;':Xf' t r.l! 1 ,ll i -, ~_ H "
(j81 ! 'J
F I to I)
t '!: ipt ...r
1, .~ O!j
'}" L ~"
'! MLJ:..:Y BOhr! "NO ^:;;';l J(' '\TE~ .,.
'}() BOX )JObS
!{ALE U:H N( .~ " ':I 11)
JEll BUSH
GOVERNOR
IJlSt-'l ''''r.\ t ..UI!~fU BY lAIN
S,MONE MARSTILLr:H
.;ECRF.:T.~Rv
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I:
.
I.
'.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
State of Florida
Department of State
I certify from the records of this office that BUREAU VERIT AS
NORTH AMERICA, INC. is a corporation organized under the laws of
Delaware, authorized to transact business in the State of Florida,
qualified on April 1, 2003.
The document number of this corporation is F0300000 163 8.
I further certify that said corporation has paid all fees due this office
through December 31, 2006, that its most recent annual report was filed
on April 25, 2006, and its status is active.
1 further certify that said corporation has not filed a Certificate of
Withdrawal.
Given under my hand and the Great Seal of
Florida, at Tallahassee, the Capital, this the
Thirtieth day of October, 2006
s-~ '1. Ceb~
,
Secretary of State
Authentication 10: 000081327890-1 03006-F0300000J 638
To authenticate this certificate,visit the following site, enter this
10, lInd tllen follow the instructions displayed.
www.sunbiz.org/auth.html
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
~""''''''''' ',""_r_""""'.~'" ~,...;'..~
:Fi.ORIDA DY~P<<>AR7~:STA',1fE:== ^;'.::~"::,:X:w,' ~tt,I'~'~.
:D'IVI'S I 0 N:'O f:: G~":::~:-:~'>;~?knb(Z;.cifg':~,;;:~~^ ~~~J .~~~~
..._,fi!l_".... .. ' . ._" _~".i;. _rJl,.... '_"-'~"".__:::..Jl" ~ ..._.;......~wa::f,"'.':?t,_.."~ ----:...... ,...~_~, ... ~ ,~
~.,~:l:-"f-.:.-~~tJ~~......yJ'-....~~~' _ -' ,.':";~~...i_."...- _~ ____MIft.I~F- .'\~S~-:" : :~_ ~$
~-,- " .._-,-, ~~~4
Home
Contact Us
E-Filing Services
Document Searches
Forms Help
Previous on Li!il
No Events
Next on list
No Name History
Return To List
Entity Name Search
Detail by Entity Name
Florida Profit Corporation
COMMUNIKATZ, INC.
Filing Information
Document Number H76414
FEI Number 592591434
Date Filed 09/17/1985
State FL
Status ACTIVE
Principal Address
4141 NE SECOND AVE
#101-0
MIAMI FL 33137
Changed 02/27/1999
Mailing Address
4141 NE SECOND AVE
#101-0
MIAMI FL 33137
Changed 02/27/1999
Registered Agent Name & Address
KATZ, ERIC S
4141 NE SECOND AVE
#101-0
MIAMI FL 33137
Name Changed: 02/09/1998
Address Changed: 02/27/1999
Officer/Director Detail
Name & Address
Title DP
KATZ. ERIC STEPHEN
4141 SECOND AVE #1010
MIAMI FL 33137
Annual Reports
I.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Report Year Filed Date
2005 03/02/2005
2006 01/20/2006
2007 01/04/2007
Document Images
01/04/2007 -- ANNUAL REPORT
01/20/2006 -- ANI'-JUAL REPORT
03/02/2005 -- ANNUAL REPORT
04/26/2004 -- ANNUAL REPORT
01L2J/2003 -- ANNUAL REPORT
01/31/2002 -- ANNUAL REPORT
01/16/2001 -- ANNUAL REPORT
01/27/2000 -- ANNUAL REPORT
02/27/1999 -- ANNUAL REPORT
02/09/1998 __- ANNUAL REPORT
01/27/1991-- At-lNUAL BEPORT
04/04/1996 -- ANNUAL REPORT
06/20/1995 -- ANNUAL REPORT
I Note: This is not official record. See documents if question or conflict. I
Home Contact us Document Searches E-Filing Services Forms Help
Copyright and Privacy Policies
Copyright @ 2007 State of Florida, Department of State.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
'.
.
.
.
I.
.
.
.
.
.
.
.
.
.
.
ifJ
:::::
:il
:il
z:
C3
z:
~
:;]
z:
00
_ OW
< ~ N~
Cl :il ~ "?
CZscnS
0::::: -o~
~Q..cr:<'1
. ",-'
0"'0 ~":
Ol Ql
~Cl'iij3l
E-<:X:O'"
~6b~
("1)1:1:1 ~ ~
_,..6:{,~iif""
{]A. ~-':'
'~~;&,.~;
"~~~:./
I
I-
W
OWCO
CO::CO
-I-......
IIl(/)N
..... I
Q)IN
~I-~
._,.... ('t)
C)N ('t)
J:j~...J
Q)ZlL.
'>. 0 --
C......::2:
COCO-={
.....0-
u.......::2:
L
I
..J
UJ
a:
UJ
J:
J:
t)'
~.
f-'
UJ
0.
en
Q
.
CO
coW
OLL
0)'
N~
a:Z
~Q
:sl-
:J~
z-
ZQ.
O~
I-
~
C2
o
J:
I-
:J
<(
LL
o
~
...J
>-
!Xl
o
uJ
ex:
5
"
uJ
ex:
I.J)
<(
~
...J
D..
I.J)
o
("'"l
("'"l
("'"l
m
o
o
,
en
o
I'-
o
..
o
Z
l-
is
::J
<(
.
. AUG-21-2007 22: 48 From:
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
.
.
I.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
To: 14078988400
Page:4"8
. . ~ .- .....- '" .. .
lI'1QlUDA. J)IPABrMJSNT OJ'srAT&
Kt~~!1=
Auguet 21. 2000
C T CORpORATtON SVSTEM
T~HASSeE. Fl
Qu~ dooumentl for QUIDANCe PA1lfWAY SYSTEMS, INC. ..,.. filed an
Au~2', 2000 and aesI~ document numw~' P-.o refer to IUs
n&Ji;,ber whenaVer ~dblg wfth thII offtcI.
Your corpora1lan " now quallfled and ~ to tranlSd,01 buIlf\e18 in Florida .. of
tt. file dllle.
A ~n emuaJ ~rm buBlneee ~ wfII be due 1hl& oftIc. betWeen
JanuaIY 1 and May 1 o1lhe ~ foIgwIng 1he ~ year tJf ,. fl. delle. A r:e.rat
~ lcsentHiciatlon (FEI}J!HrntMr wi .. requlrld bItCM'e tNI ~ *' be tied. If
you 'dO nat ~an PEl f\\Imb8r, ~ IIIPY NOW with ... "*"* Rev.nue
rI'/ ee"'nu , and raquedng fonn 8S~.
PI... be awwe it the OOf1)orate ICICtrM8 dlanpe, It \I the ~1IIbI1ltY of the
eorpQrQtlon \0 natllyUQ ottoe.
8houId6051 ~F lWfe ~ ~i0n8 ~ this matter. pi.. telephgne (650) 481-
. ~'IV ar1IV1 QuiI!1IlCldonfTax U&n Seetion.
Buck KtJhr
~~~ LIIlt8rNurrhr,2(X)A00044755
~ otC~cma - P.a. BOX MI'1 -TIIlJ,b.lftftt f1artda 3231.
n'.....,-hCC'T..
Sde:WOJ~ 6S:~ seee.~
.w.sunbiz.org - Department of State
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
I:
.
I.
i.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
:Of2
http://www .sunbi z.orglscri pts/ cordet.exe ?acti on=D ETFI L&i nq_ doc _nu. ..
~r~~~Do~rf~~~i~I~{'~.........
===~:;;;~.<~.., . I~",-",,,--....--,, = .\~ ., ~~
Home
Contact Us
E.Filing Services
Document Searches
Forms Help
Previous on List
No Events
Next on List
No Name History
Return To List
Entity Name Search I
Detail by Entity Name
~1.Qr~da Profit Cor~oration
HALL FOUNTAINS, INC.
Filing Information
Document Number 361606
FEI Number 591293344
Date Filed 03/25/1970
State FL
Status ACTIVE
~rinci~al Address
5500 NW. 22ND AVENUE
FORT LAUDERDALE FL 33309
M~i1ing Address
5500 NW. 22ND AVENUE
FORT LAUDERDALE FL 33309
F!~gistered Agent~ame & Add!e_s_s
HALL, STEW ART
1922 NW 80 AVENUE
MARGA TE FL US
Name Changed: 08/13/1998
Address Changed: 08/13/1998
Officer/Director Detail
Name & Address
Title VPD
HALL, STEW ART
1922 NW 80 AVE
MARGA TE FL 33063
Title PO
HALL,SCOTT
1295 NW 114 AVE
CORAL SPRINGS FL 33071
Title SO
10/8/2007 9: II AM
.w.sunbiz.org - Department of State
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
'of2
.
http://www .sunbi z.orglscri ptsl cordet.exe ?action=D ETFI L&i nq_ doc _n 1I.. .
HALL,TANYA
1295 NW 114 AVE
CORAL SPRINGS FL
TitleTD
HALL, BRIAN
7643 NW 60 LANE
PARKLAND FL 33067
Annual Re~orts
Report Year Filed Date
2005 04/20/2005
2006 03/31/2006
2007 03/14/2007
Document Images
03/14/2007 -- ANNUAL REPORT
03/31/2006 -- ANNUAL REPORT
04/20/2005 -- ANNUAL REPORT
04/26/2004 -- ANNUAL REPORT
04/23/2003 -- ANNUAL REPORT
05/02/2002 -- ANNUAL REPORT
05/04/2001 -- ANNUAL REPORT
I
I 05/02/2000 -- ANNUAL REPORT
04/20/1999 -- ANNUAL REPORT
I
08/13/1998 -- ANNUAL REPORT
07/01/1997 -- ANNUAL REPORT
06/11/1996 -- ANNUAL REPORT
05/01/1995 -- ANNUAL REPORT
--_._-~
I Note: This is not official record. See documents if question or conflict.
I _ _ _ .. _____ _
Home Contact us Document Searches E-Filinq Services Forms Help
Copyriqht and Privacv Policies
Copyright @ 2007 State of Florida, Department of State.
10/8/2007 9: I I AM
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
c :;
\ - ~<
, ' , ~. -
.~ i
. ... '.1. I
< :. :'.
. . , C l 'c
~ \ ,\
;\ ~ )' i,
.,
, . ,
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
State of Florida
Department of State
I certify from the records of this office that O'BRIEN LIGHTING, INC.
is a corporation organized under the laws of the State of Florida, tiled on
March 27, 2002.
The document number of this corporation is P02000036I 04.
I further certify that said corporation has paid all fees due this office
through December 31, 2007, that its most recent annual report was tiled
on April 20, 2007, and its status is active.
I further certify that said corporation has not filed Articles of
Dissolution.
Gil'ell /11lder lilY Italld al/(l tlte Great Seal /If
FI/lrida, at Tal/ahaHee, tlte Capital, tlti.\' tlte
Twell~l' FOl/rtlt day of April. 2fJ07
Secretary of State
Alllhcnticalinn If): I000911JJ9471.042-t07.I'020000J61ll4
1'0 ,1LIlhcnticatc this ccrtiliciltc.\ isit the follu\\ iug. site. cnh:r this
II >. and then foll,-)\\ the inslrudiulls Jispb) t:u.
www.sunbiz.org/auth.htm I
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I.
.
.
.
.
.
.
.
Company Surveying License
...._...1...
.,. . ~ '_ ,- :: '::'..:~.>"~~'~:i~~
".. ~'.~~ . ~~~ '. :r~ .-
~li, . ,,~(: ;i.!:~:"fl ~ .
O~~~(,. ..,.I! . ";~' ';::I?<
. ,: '.;;-sEG# xt . "'O:2~O
.. L ,,'.' .," t .(..,
_. .~~. \,()~., W:~~~\ ~n\,.:..Qf)~L"("-''',
\ . _. . _OJ' -=-, .~.... _..DO<.
.___....._._.__...........--_.._._.......7--
Ac#3104181' '. . ..'~;..:..;;;~StAtE:c)/~.P.L6R.lbA;~.\;..;:..... '. ....... ...... '. ...... .
.. :;.'.<~::'-; ~<k );.riEPARTMEJ.f'iQ~i~J~si$f~t-~~r}~.::t~6~i~~~~AL::i~~~tfL~.~ oi1t j:i~;~>"~"., ;~;; .;:
".;. .i{~; . '/~\. ;~;;::. >/;./';;~:::,.:..~)};;~~b~~':~!:~~~~3i~y~;.:~~~~~,~~#A:i.~r.-~f.. .~~5~ ~~O\:~~bt~~~;
:I.iI~~-~~~:.-,NE~~li~.iiS....~~i~..~~.~... .:\'"-"fri.:-,r:..f.... ;'t~>3ii; "::,'.":'.e:"'.;.'" ,~~: .:;::rr..~.
:..-9'~:. .~ ,-,~;~r;,flr~.~.:;.. ...~":ff~.. t:1'~"".'rr:..'.," _ .:..:.~~ .~':":'.'I ."n~",:~:
.,~~:;:~:~rJ~~'~~Ngi~~~~if:;~~.~\~i~, =-~'~/' .0. ~~jt~~:%~:~J~~. .\f.~.,.I_.~.(.~..,;::.~(.,!:~:r . :~.;).~,!,;(:.~...,..,.f.:.~.~.~.'~~
.:,..,.tlnd~~.t1~he;.ttfr~..\i.~S-~ons".of ~a . ... " 'St&J;"!:l.~JI ,~ '~A~~~' -
.. Expir.:fEion'--dat'e: FBB. 2'8.' 2' (l Q; . ~'; .. ..0 . ..
"~~ig~~~~~~~~1i~~lc 4~~ ,,~~ . ~1f.C~'l~j';["'I' :l!t..~,~~; ;~~1,'.,;;......;::'.t,
HOLlJ'rnOOD'". ....f ".F~ ~~~'~.~P,~Oi) wl~":: ..I~li:',.,. - .
I":...~.' 1~.:II~_:;~..~.~....~!.'P,'._~ :~,'~.' ;.':..'-:~~~_".':,\......ri- .....,. '-'} .:W .}i.i~l~~,~;' ':~{i1,~~::L',',!;&;,: '.~r.' .A{j:>J:""* ..~(~:j~i;<<:,r;f!J:.. ."/!~ti:*-':c '~~:;G;i'.:,;.::..~::
".' " /I"~, . ",,' .J '_ - '.\:l' '<;'.1~ '.:i..:!tdl,~,.". ).~);Rq:!,,~~. :;;#.\1. :,h~~'.. A\~~ '~"~'. ~I~ i/I\~:' . ~-I.:."{j'~),.r' :.~.!". ~).1' ,.) ..',:!,' .
.,.............'.:..'>.~..~.,.. C1fAR~,;.mta. ". :RiCS 'I!:;;'i~ <:'.';::011' ~H ;~:..j~,f( ',)?'.i'S'I(~'i :'.,~~"'i '~jf!Y. ~.:;~~"f :TS::~; I, ;~j",,~~':;iJ~ful N"'~ xN . ,;:;i; '.:.:~;: ;':":."
_ > .. "(1 .. .... ,;;:;i)~~i: fo:.i?,:...;..:'l'l'..~~~:~>>.~~t;..'~2'<U";:;~;.<~.','r;;:.'t,'~l:l;;,;.~jCl.;r, ~RETE"',"~r ..Io..~':!: ::<:( "<:.:,,.
"~~ lE .~R'~..~:~y,.;I:E' "'''',:JmlSp0wA~REQ'Reg,,~y LAW';;"~' . ;R;L.., ~"" ~~~,.' ~'. 'yo.::.' ::;.;,
.~~T';' "
...:..~;~... 'i
.,.~;..:. ,.
:,':'"):..
i
. "
.
\-, ~
l.:.~.)
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
4.
4.
4.
4.
4.
4.
4.
4.
4.
4.
..
4.
4.
..
4.
~.
~.
~.
4.
4.
4.
4.
4.
~ .. F6AM loJo ~Ol 2ll~~ .~~l 'F Camp aBnly'owoacr~'dupCaO.t1~ontyal Lt' cellS e '~:'~'P:::"~.;E'~:_f,"N~.::,:,u.:,'._:,~.::.~:~.:l\"'.[::..,~'[r~"'.~Il~""~'~':";~:I,,~.~.~:..::~.f..:t.,:;;.-~'.:.;.r:".~':::":~":'~'l;.):,~~:,~.::_,l.;,~:;~';~':..-'~.~,._::r';'.':;"';"';i"-.";'."I:"..~':!,'.1,;,.,',:'i,,~.,'~,',','.,.:~,'_':'~,.:;,,':'~iW-'.::.j:.......~,..,:
;.....r.'.:. ":.1.~.'1. ;...~.'~:~,..~.~.~;r.~:a....:.'..~''r'.:.RA7:.I_iN:...: vr. ~u ' :..~;:,~: ;~ .~,_.
.. .... m_.__._. .... ~~.:~; ~:~Aft~~.UEt~';31.:~.'~s~.:, . :.1.:'
.,., {tJ NEW.', ;"::~Q.ATS,~J City of Miramar ~~':~~t~t:-~~i(j~~~ir~f~~': .
'." "sr"n;OReOU~1YCERTII<E(i' r . orAhi.Nov;,mboraG, .... .... F.I3
'. ~i~2;~;~;7;. w ~~~~:~/~~:a:;~=;l~:~: '::'~~""'" ",~JI~
f:tUS'I:N~;S$: F"HO~m~ (,.~. "'..,._,c,':~~.'.I" '. ,.,. ".' ,J" . ";.C'r.l', ';"::,"'~ ,~:~ ~n ~
" . . . '. . ." '. '..' .. :..' '. ':'" .":<;,;'S'"H~c.~!I.~.\,~,,H~~.I~I,~I.,.t;:: A~a~,o/OIATr::;.~:~ . ". E ~ ~ ~
. <"... ..... i.'.""'" '...!.,I:NC. ...,.'...,.... .."..........'.', ...,..&.i = 3_
TKI9REGEIPTMUS'T'B~CON5pICUOU91.VOISPL~YEIl':',,,, "i.,nCHW'I:n~i1\1~,',;SIUS~H,lgM1S0r.:-:rNC.. .' :--,~,:;<,~
to PUBLIC VI1:WAtiHELOCATIONADORI1SSABOliE. . H..... . . 321;D qOJ{POR~T~. ;WAY ,. .; ~;~, " . E:'!.~~~~,=,
BDft.^'^R~~,I:~.~,~f':R' FL.. , , ,~,::(J~,~,. .),::::8 .~~~
" 1).Y',..!.t'I U., ,:., l.1)'P.~?F,~~~!~ESPNC,M~D 'I' ",~ ~ .;'ffi!@
.__....9~~~~'IIl~IN!r.~~I~lNO. jtn~M::,;. . "". ...: ~,.. ,S!
'. ".' '. . "'-,' ."' '. ,4..UNIHi' ~. . , .s..
. BROWARD COUNTY REVENUE cOLLECT'ON. '2007:.- [2008
. 115 S, Andrews AvenuD, Govemll'lGnlal Center Ariliex . c'....
. FORT LAUDERDALE, FL 33301 . '. . . PAYM!;t-fTF;lEce.NEElAS;VAUOAiEDMOVJ:: :SEE INSTRUcnotolS ON R1:vER 5.E SlOE ~.,
wwW.broward.orglrllvlInu.. '. . .. . . .'. .. .. .
:.."pr#r.uJ.[lJlbJlnJ"h_JilJ.'nr.u::w.:Z!lJ'l.tL.s:.uianW'U.!I.r..hllll1:l~1.l1ru,. :L.'~~ _:~~__---,.._. _ __ __,.,_ .'--_
/ l .. B....rd 01 cc~ntv CCnl"'f8&i"Mr~; Browerd Cc~nly, Florida . .. .
. r' bROWAR[lCOUNTY LOCAL BUSINESS tAX ReCEIPT ' .
FoRM ND.,nt.ZDCV,6,C2!HlBl" FOR 0 .....
';' RV201l7JO~~(~"~3o\)n . .' PERI D OCTOBER 1,2007THRU SEr-1 EMBE~ 30,2008
.to' .
d TRANSf'ER SECII31 I. :::. 'is' .
x 0 RENEWAL
.;;.7:S0" :
TOTAL :'
. PEKAL TIE~ IF I'NO . .
OCT, ..10% . I:' l>Iov,. m~ '.
.bEC, .211%. 'AhrbEC,.'I1'.25%
. Pluo T~. ColIOCllon Fea of up to S2S,OO
. Boood Dn C"'l 01 SU!IMS' To IrPald
On or lIM.r Nowtmbet .30, (.g
~ ~~ffl
'.:1 "'" Ifl
~ ~... -a ~el..,
'u .....~.. e3
... 0....... -= !Wl ~_..
~ ~~ g ~ .~.
.'- ""'.. L__ :.::J 1::~
Gr:l. c.~' -c;-:'
~~'.: ~
-<'-'1!c, ~._.
t::';;.a..... ~l:::~)
~~ ~~,~
1- """-"') ::t~
t.J1. ....... ;;L......:..
;0. . 1;:' ~
:::3
)(qNEW DATE BUSINESS OPENED
STATE OR COUHn' CERTiREG r., j' c;:: I~ 5E:
all~If1Bn l.oc..rlon ^d'cfrue::. .'
J240 CORPORATE W~y
HIRAMAR . 3~U25'
r:ll.lrH~II:8S PHO[III:i: ~ l' :r.OS )-1-::1. 5""70Hl
.,lA,X':' :"
SA~k TMl
PENALTY' .
tC.FEE',
lRAN!~E~
r.
..
'.'" ~
THIS RECEIPT MUST BF. CONSPICUOUSLY DISPLAYED
TO PUSUC VIEW AT THr: LOCATION ADDRESS ABOVE,
B~ARD L.. . . TY~E DF B~SINESS TA)( PAID.
.--. COUNT~ .' .. ..... .'
.__._,_1Ia._ F<:OFGrHW."LAIIID 8LJr1VEYtm
. . ';7 U~ilI H1 ..
2007 · 2008
1'l(:L;.1ENlRECEIIl.EO.AS.V4LlnATl'n ARn>./E_ ~EJ/lSTfYJCTIO"S ON )l.~B.ESIOE
BGHWEB~ESH18KIN 8 AS80~IATES
3240 ~OPORATE WAY
I"/IRAMAR FL.
330::,~5
. BROWARD COUNTY REVENUe; COLLECTION
115 8. And~~!_A:v~~.~:.~~~~m!.".!,a! Center Ann9X
BUSINESS TAX RECEIPT
(954) 602.3040 PHONE
(95~) 602-3470 FAX
** RESTRICTIONS**
MAIL & PHONE ONLY ,
NO EMPLOYEES AT IIOMF.
NO WORK ON PREMISES
NO CLIENTS AT HOME'
NO OV,LIVERIES TO HOME
HOME USEO FOR OFFICE ONLY
.. .~~~~>~
I~~lf~"
",
.
..,....'llt1..
LICENSE NO: 900294
SCHWEBKE-SHISKIN & ASSOCIATES
3240 CORPORATE WAY.
HlRAMAR
FTJ
33025
BEGINNING 10/01/2007
ENDING ON 09/30/2008
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
"'ilir,o;~~i;~h,~f ..... :~~;~~;~~;~!~r~;~;:;;_;]iJ~~~~~1
..., ' 0 ,:(:21. )~' c:t.1" ,e1i'i~~"7 B.:)}rj tS~'~6' }ie-w:,"' ,:,-;:.'."~j:,,'",,.'if1-";l, ,.'"
>?,:''J;he~<SU1't .Y~~IOOP,P'E~.1; :'f;,";,.,~ r, "
~, :",fllaJli~~p. ~~l~#' S~t\'~'tICli:1f$EIJ: ",l.l!/'If. :':?,~,;,'~.t,'..,\,~:',.~,.<,~?
"~UIlde& \;!'~e"'Plt'c:,.if.1i'9iOliS~",e'f'ctHt~~ ., :
, ExpiratJ.on dat;:e~: FEB"2a,.20~$
, " ." ." .~. .:;,,, ,-" if.'; .II-.~c ''';~ ,.., ... .... ... .',,, ,
. ; ;r~i~~~~~t~'~~~'J:t:(~~ ~,,- ~ "".i~t~'~lf~,~t}~~; 1~::t~Jf0 ..
:~:ii.ii~it~.. .j~;,3ll:1111,jt~~l~~]/"J;:~l"-
CbV)i:RfloR.'f'!",. ", :", ~,!fdISPdZ'l [S:~~bi,Ji~;g~y ~~~~-?'~f!"'{n;:l:!RETAln~'~ ',r.:"j~,}:.:")', ;"
"..;
t{~;!ljP
'in~.J ~
._.c....
'.t."~:.~. .
.,'
..~,~' ~. .~
';;:-:',; '.
'. .~~j~~r~~ : "Ii(it" i~~"{'r:"':;~-
,.~.'t. .... d. . .. ,-' . ':r"' ,.
r~? !~ ~~:'t~': ~ :?~f.)\'l,;,.,:;,:.~,:<,,;...:,~{ it~,~,.)~,~,:,:.:,:,,::',-".,',','.,..,~,;fl:~'
~~(~~~v \~t)! ~~,~~~ . _ _ ~ .,
~ ,.' '." ,.
';'1'"
'~i,i".' ....
:~~~df
~ '.a:~.
..;i,,":'
,,;.' ....~ ;:. . ". .':; l,.
,::f(;;t,:~~F:
: I ~ ,;...
~::~..
,:;..
J'.'!'~.'
1\"
<:"~"'~,1'~~ '.i~:' ~~:"I;:~~,.
CHARr:t-~i1e~IS'J:!r '0
""'\GOWRNG'R,.~~"', ":~"'"
~ ....;;:=.,.,".J,j.- ......<:i--.. .,,1::'.._
'"'
.:i, :,\
:"f:.
.....
~:::~; u;
"
,!:;d~~'~~::';: ~~~ ~:~!"~'~:~;:
\'. c~~fi~'~~;~~~r,~'Jt"
~~?f~~.!~"~:~~'
~f<~~~: ;-~~~;j
'. ~ ~~'. :'If '~~J'~
. :~::~;~'r
:?'~"
:;,('i
:;~: ".
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
~
o.
\0..
Q
n-
\. ~ .~~...
I
(>"
!{@t.,
tt _ofjfro '
~ta . ~ ~,=~-:~ l!tba
~
1IJrpartml'nt of ~tatl'
I certify from the records of this office that SWEENEY & ASSOCIATES
IRRIGATION CONSULTANTS, INC, is a corporation organi7.ed under tho laws
of California, authorized to transact business in Ihe Stale of Florida, fjualified on
July 6, 2005,
The document number of this corporation is F05000003890,
I further cer1ify that said corporation has paid all fees due this office throu9h
December 31,2005, and its status is active,
I further certify that said corporalion has not filed a Certificate of Withdrawal.
Given under my hand and the
Great Seal of the State of Florida
at Tallahassee, the Capitol, Ihis lhe
Seventh day of July, 2005
CA2f022 (2,{l:i'
V--LL.~ ~ f ;</ecd
(t,l.CllDa ~_ Hlhl11
~l'cnt;tr1! l,f~bt('
B~ .~,
):;:.;.~~..
-'
~"..i' ~~~ ~
IJ
~~~
~
n~1,;
"'~bl
~tl
~.. ~t;1,t
I
~:~
,..J{'!~'
~~
~I~~
,.~\5,. ~~.','
'1~:
~~'
:~.~j.:
I~(~
,
~1I'!l\,
r"I;.'I~'
-.'k'
~~iM
~'
:Jr.i'
,-~(;~
~~'
~i.J1';
P,TI~
~v'-'
I~',',';~'.
~~-~
17."'i,'
~t,;~
,i-f.,..o
r:tl..':}~
!;t!C
,~'ti:::~
I--ii~
I,',;..
't~:
? ~". .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.........,.~#'...~"',c,.~....,,"';, . ... . . . __,..,.~ $:,p.>s.~'
~b\~~~~;'~ D~;~~~~f~~~?If~~~~ti~~
=::;~~~~N;~:':='''~~'';'';''~::::;~. ~~:.:.~ :~~
Home
Contact Us
E-Filing Services
Document Searches
Forms Help
PreviQ.l!Lo..nJ....iS.t
No Events
Next on List
No Name History
Return To LisJ
Entity Name Search
Detail by Entity Name
Florida Profit Corporation
URBANOMICS, INC.
Filing Information
Document Number S96043
FEI Number 593100045
Date Filed 11/22/1991
State FL
Status ACTIVE
Principal Address
13000 SAWGRASS VILLAGE CIRCLE
STE 38
PONTE VEDRA BEACH FL 32082 US
Changed 05/10/2000
Mailing Address
13000 SAWGRASS VILLAGE CIRCLE
STE 38
PONTE VEDRA BEACH FL 32082 US
Changed 05/10/2000
Registered Agent Name & Address
CREVELING, KENNETH H., JR.
13000 SAWGRASS VILLAGE CIRCLE
STE 38
PONTE VEDRA BEACH FL 32082 US
Address Changed: 04/30/2001
Officer/Director Detail
Name & Address
Title DP
CREVELING, KENNETH H.,JR
14 SPYGLASS LANE
PONTE VEDRA BEACH FL
Title ST
CREVELING, JUSTINE R
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
14 SPYGLASS LANE
PONTEVERDABEACHFL
Annual Reports
Report Year Filed Date
2005 04/30/2005
2006 03/27/2006
2007 04/13/2007
Document Images
0.4/13/2007 -- ANNUAL REPORT
03/27/2006 -- ANNUAl REPORT
04/30/2005 n ANNUAL REPORT
04/15/2004 -- ANNUAL REPORT
0~21/2~Q~--ANNUA~REPORT
05/06/2002 -- ANNUAL REPORT
04/30/200.1 -- ANNUAL REPORT
05/10/2000 -- 8NNUAL. RI;PQRT
0<t/28/1999 -- ANNUAL REPORT
Q~/OB/1998 -- ANNUAL REPORT
04/28/1997 -- ANNUAL REPORT
OS/29/1996 -- ANNUAL REPORT
Note: This is not official record. See documents if question or conflict.
Home Contact us Document Searches E-Filing Services Forms Help
Copyright and Privacy Policies
Copyright ([) 2007 State of Florida, Department of State,
I;
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.