Loading...
HomeMy WebLinkAboutThe WeitzJAN 1 i 2002 City •66 Y of Sunny Isles Beach QUALIFICATION SUBMITTAL PROJECT NO. 01 -12 -02 5 -tANY /S4 Ik � O � 0 u r i9 P 9 tiF �* F'o� 5 C,/;, Y o F s u N Pao PREPARED BY: THE WEITZ COMPANY 560 VILLAGE BOULEVARD, SUITE 120 WEST PALM BEACH, FLORIDA 33409 PHONE: (561) 686 -5511; FAX: (561) 686 -7774 JANUARY 17'", 2002 THE WEITZ COMPANY 560 Village Blvd., Suite 120 West Palm Beach, FL 33409 -1963 561- 686 -5511 Fax: 561- 686 -7774 January 17'', 2001 Mr. Christopher J. Russo CITY OF SUNNY ISLES BEACH 17070 Collins Avenue, Suite 250 Sunny Isles Beach, Florida 33160 REFERENCE: CITY HALL PROJECT NO. 01 -12 -02 SUNNY ISLES BEACH, FLORIDA Dear Mr. Russo: The Weitz Company appreciates this opportunity to present our credentials for Construction Management services in response to your Request for Qualifications for the above referenced project. As a brief introduction, The Weitz Company is a privately held employee owned construction firm that was established in Des Moines, Iowa in 1855 and got its start in South Florida in 1978. Through the successes of our major divisional offices we have grown to become one of the largest general building contractor's in the United States with annual revenues exceeding $750 million. We feel that we can be of great benefit on this particular assignment because of our extensive experience with commercial construction. In fact, in the past 10 years alone we have completed nearly $1.6 billion of this specific project type in various areas of the county. Our Florida Division, in particular, has constructed a number of notable office facilities for clients which include the City of Port St. Lucie, Motorola, United Parcel Service, South Florida Water Management, and Florida Power & Light. The magnitude of our assignments have ranged in both size and complexity and include mid and high - rise structures, campus style facilities, class "A" office buildings, warehouse and distribution centers, flex and spec space. We find it pertinent to note that we also have a very successful working relationship your architect, Spillis Candela DMJM. Together, we built a 3 story, 146,290 square foot headquarters for South Florida Water Management in West Palm Beach. We have also recently worked together in the preconstruction planning phases for the expansion to Gulfstream Racetrack in Hallandale and Boynton Beach. GENERAL CONTRACTOR • DESIGN - BUILDER • CONSTRUCTION MANAGER West Palm Beach • Colorado Springs • Denver • Des Moines - Omaha • Phoenix • • • • • i i • • • • • • • • i i • • • • • As you will see from the attachments, our intent is to assign a senior level staff to manage each phase of your project, from preconstruction to construction. Jim Marshiano will head up the construction staff as your Project Manager. Jim's experience with City Hall construction includes a new 3 story, 70,000 square foot facility for the City of Port St. Lucie. Moving forward as your Construction Manager, we will strive to develop a synergistic, effective relationship with you and your design partners. The goal during this process will be to help guide the design to an established budget and to minimize surprises. We have a very successful track record with completing the most challenging projects to cost effective and timely completions when a team approach is implemented. In fact, 90% of our assignments utilize the Construction Manager at Risk method. In order to more effectively monitor and control costs, we will use our "Parameter Estimate" format to summarize costs into categories by building function. We will then compare this cost information to other similar assignments we have completed in South Florida. This highly efficient tool will enable the entire team to view the estimated costs on a "Big Picture" basis and help identify cost components that may appear out of line from others. As design continues to progress our estimates will obviously become more detailed. To organize this information we will utilize our "Closure Document ". This document will be updated 3-4 times during the preconstruction process. It will include a number of checks and balances such as scope of work checklists, cost models, variance reports, schedules, and logistics plans. Our preconstruction services will also address issues related to noise, dust, cleanliness, worker professionalism and community relations. Further, our experienced staff will implement the latest construction technology to help expedite communication amongst team members via the web. This approach, combined with our extensive commercial experience, has earned Weitz a reputation for consistently delivering high quality construction while being sensitive to the unique needs of our clients. To close, there are clearly a number of reasons for selecting Weitz as your Construction Manager, from the experience and continuity of our staff, the control systems and communication tools we utilize, to the long established relationships we have developed with local building officials and Subcontractors. We believe the most important reason, however, is our reputation. We encourage you to contact the list of references that we have provided to learn more about what you can expect when working with our firm. With that said, we welcome the opportunity to meet with you and your associates to discuss your project and our approach at further length. If you have any questions regarding the enclosures, please do not hesitate to contact me directly at 561- 687 -4813. Respectfully, THE WEITZ COMPANY Taras S. Diakiwski Business Development Manager TABLE OF CONTENTS SECTION l: CORPORATE INFORMATION • COMPANY HISTORY • COMPANY QUALIFICATIONS • FLORIDA ORGANIZATION CHART SECTION 2: PRECONSTRUCTION PHASE STAFFING • ORGANIZATION CHART • STAFF OVERVIEW • STAFF RESUMES SECTION 3: CONSTRUCTION PHASE STAFFING • ORGANIZATION CHART • STAFF OVERVIEW • STAFF RESUMES SECTION 4: RELATED EXPERIENCE SAMPLING SECTION 5: PROJECT APPROACH SECTION 6: MINORITY BUSINESS PLAN SECTION 7: STATEMENT OF BONDING SECTION 8: CLIENT REFERENCES SECTION 9: RECENT & CURRENT WORKLOAD • CURRENT PROJECTS • COMPLETED PROJECTS - PAST 5 YEARS SECTION 10: SUBMITTAL REQUIREMENTS • SWORN STATEMENT PUBLIC ENTITY CRIMES • NON - COLLUSIVE AFFIDAVIT • BUSINESS STRUCTURE • LICENSES & CERTIFICATES • SAMPLE INSURANCE CERTIFICATES Sh:CTION 11: FINANCIAL STATEMENT COMPANY HISTORY The Weitz Company of today descends from a small carpentry shop founded in 1855 by an entrepreneurial German immigrant. In many ways, the company grew up not just with the construction industry but also with the nation. Our firm predates the Civil War, the telegraph, dynamite, and the transcontinental railroad. In fact, the same year that Charles H. Weitz opened his firm, the government signed 19 treaties with Midwestern Indian Tribes. As the years passed and the business grew, Charles handed down his craft and sense of values to his sons, who in turn passed the family business on to their children, continuing for four generations. Now almost a century and a half later, Weitz ranks as the 27`h largest general building contractor in the United States with nearly $1 billion in revenues projected for 2002. As a privately held employee owned construction firm, we have strategically positioned our offices in areas that include West Palm Beach, Phoenix, Denver, Des Moines, Kansas City, Omaha, Cedar Rapids and Temecula, California. Nationally, we offer design /build, general construction, construction 90 Division Offices •Current Major Projects management, and preconstruction consulting services to our clients. Our diverse projects include commercial office buildings, hotels and resorts, mid and high -rise structures, warehouse and distribution centers, health and educational facilities, senior living complexes, multi- family residential, retail establishments, country clubs, and religious facilities, to name a few. The Florida Division of The Weitz Company was established in 1978 and has grown to become one of the largest and most reputable builders in the state. Since entering the Florida marketplace, we have completed a multitude of diverse project types that have ranged in both size and complexity. It is not unusual to find our group constructing projects as small as $500,000 to as large as $60 million on a single project. Our Division currently employs 71 salaried employees and an additional 92 skilled craftsmen who supplement our self - performing capabilities. COMPANY QUALIFICATIONS REGIONAL DIVISION: CORPORATE OFFICE: OTHER OFFICES: YEAR ESTABLISHED: YEAR ESTABLISHED - FLORIDA: INCORPORATED: TIN (FEIN): FLORIDA LICENSE: OWNERSHIP: CHIEF OFFICERS: DELIVERY METHODS: BONDING CAPABILITY: The Weitz Company 560 Village Boulevard, Suite 120 West Palm Beach, Florida 33409 PH (561) 686 -5511 FX (561) 686 -7774 The Weitz Company 400 Locust Street, Suite 300 Des Moines, Iowa 50309 -2331 PH (515) 6984260 FX (515) 698 -4299 www.weitz.com Omaha, Nebraska Phoenix, Arizona Cedar Rapids, Iowa Denver Colorado Kansas City, Missouri Temecula, California 1855 — In constant operation for 147 years 1978 — In constant operation for 24 years 1929 42- 1512625 CG- C060620 Privately held, employee owned Richard J. Oggero Glenn H. De Stigter David S. Strutt Leonard W. Martling Gary Hennings Donald R. Blum Preconstruction Consulting Construction Management General Construction Design /Build Chairman President, Chief Executive Officer Chief Financial Officer, General Counsel President — Florida Division Vice President — Florida Division Treasurer In excess of $750 million $30 million per project without approval from Surety COMPANY QUALIFICATIONS DUN & BRADSTREET RATING: SELF - PERFORMING CAPABILITY: (FLORIDA DIVISION) EXPERIENCE MODIFICATION: SAFETY RATING (EMR) CONSTRUCTION REVENUES: NUMBER OF EMPLOYEES (FLORIDA DIVISION): GEOGRAPHY OF SERVICE: A ++ All Supervision Carpentry (Rough + Finish) Concrete, Concrete Formwork & Excavation General Labor Site work Light Structural Steel Erection .65 Nationwide LICENSED STATES: Alabama, Arizona, California, Colorado, Connecticut, Delaware, Florida, Georgia, Illinois, Indiana, Iowa, Kansas, Kentucky, Louisiana, Maryland, Massachusetts, Michigan, Minnesota, Mississippi, Missouri, Nebraska, Nevada, New Hampshire, New Jersey, New Mexico, North Carolina, Ohio, Oklahoma, Oregon, Pennsylvania, South Dakota, Tennessee, Texas, Virginia, Washington, Wisconsin, and the District of Columbia. FLORIDA REVENUES NATIONAL REVENUES 2000 $78,284,000 $718,098,000 1999 $107,276,000 $657,124,000 1998 $79,040,000 $576,527,000 1997 $73,782,000 $418,620,000 1996 $53,457,000 $305,380,000 1995 $60,703,000 $307,952,000 Nationwide LICENSED STATES: Alabama, Arizona, California, Colorado, Connecticut, Delaware, Florida, Georgia, Illinois, Indiana, Iowa, Kansas, Kentucky, Louisiana, Maryland, Massachusetts, Michigan, Minnesota, Mississippi, Missouri, Nebraska, Nevada, New Hampshire, New Jersey, New Mexico, North Carolina, Ohio, Oklahoma, Oregon, Pennsylvania, South Dakota, Tennessee, Texas, Virginia, Washington, Wisconsin, and the District of Columbia. FLORIDA NATIONAL Total Staff 71 491 Full -Time Senior 12 179 Management Project 59 312 Management Skilled Varies Varies Labor Nationwide LICENSED STATES: Alabama, Arizona, California, Colorado, Connecticut, Delaware, Florida, Georgia, Illinois, Indiana, Iowa, Kansas, Kentucky, Louisiana, Maryland, Massachusetts, Michigan, Minnesota, Mississippi, Missouri, Nebraska, Nevada, New Hampshire, New Jersey, New Mexico, North Carolina, Ohio, Oklahoma, Oregon, Pennsylvania, South Dakota, Tennessee, Texas, Virginia, Washington, Wisconsin, and the District of Columbia. COMPANY QUALIFICATIONS COMPLETION OF WORKS: The Weitz Company has never failed to complete a contract awarded to them. No other officer or partner of the firm has been an officer or partner of another company, which failed to complete a contract. CLAIMS & SUITS: The Weitz Company, in the normal course of business, is a party to various matters of litigation. We intend to vigorously defend our actions and do not anticipate losses, if any, to have a material affect on the Company's net worth. NATIONAL RANKING: CURRENT PROJECTS: COMPLETED PROJECTS: TRADE REFERENCES: 27"' largest domestic general building contractor by total revenue as ranked by the October 2001 issue of "Engineering News Record ". 11t" Largest Builder of multi - family residential space in the country by total revenue as ranked by the October 2001 issue of "Engineering News Record ". 13'h largest general building contractor of retail shell space in the country as ranked by the October 2001 issues of "Engineering News Record". Leading general building contractor of Senior Living Facilities, completing more that 128 facilities in more than 28 states, exceeding $1 billion in construction cost. See attachment See attachment Hill York Corporation 3921 Westgate Avenue West Palm Beach, FL 33409 Contact: Jeff Phillabaum (305) 525 -2971 Lotspeich Company 7950 Central Industrial Way Riviera Beach, FL 33404 Contact: Mark Tribble (561) 848 -3040 Bradford Electric 7950 Military Trail Lake Worth, FL 33463 Contact: Mike Bradford (561) 433 -5194 Hudson & Sparling 7227 Seventh Place North West Palm Beach, FL 33411 Contact: George Sparling (561) 615 -4483 Rinker Materials Corporation P. O. Drawer K West Palm Beach, FL 33402 Contact: Pat Fagan (561) 833 -5555 Advanced Painting Contractors 3735 -B Shares Place Riviera Beach, FL 33404 Contact: Cap Cornwall (561) 845 -0123 COMPANY QUALIFICATIONS BANK REFERENCES: CORPORATE Mr. Randall R. Stromley Norwest Bank Iowa, N.A. 666 Walnut Street Des Moines, 1A 50304 -0837 (515) 245 -3249 FLORIDA Mr. Brian Burke, Vice President Nations Bank 625 N. Flagler Dr., 10h Floor West Palm Beach, FL 33401 (561) 838 -5077 SURETYBROKER: Malcolm McCampbell, Senior Vice President Acordia Southeast West Palm Beach Division 501 South Flagler Drive, Suite 600 West Palm Beach, FL 33401 (561) 655 -5500 FAX: (561) 655 -5509 SURETY REFERENCE: American Home Assurance Company 70 Pine Street New York, NY 10270 (A member company of American International Group, Inc.) Craig Hansen, Vice President Holmes, Murphy & Associates P.O. Box 9207 Des Moines, IA 50306 -9207 (515) 223 -6902 FAX: (515) 223 -7068 Federal Insurance Company 15 Mountain View Rd Warren, NJ 07060 A member of Chubb Group of Insurance Companies Craig Hansen, Vice President Holmes, Murphy & Associates P.O. Box 9207 Des Moines, IA 50306 -9207 (515) 223 -6902 FAX: (515) 223 -7068 04 Q O O z v� a =MZ a Oo � s AU C co O air W � ¢ W z 0 F Z �oQ �F o WaF �o wW Oazz 7FOaco z � U A�U a W z o o z z z `¢ ¢ p z o s o a0 ¢z a F�zoo�a aU oV a a w zo ° U W) A <° �a$ a a r z r z� zo o0`�'r� U aq z' Z p ¢ z w awl W o oV 'C°U¢Cax z° ~ 9z 3 a C Cx � m A d zF� a x F < z W�0 O a a F � O� �Q W WU PG A z Z a < o 9z �Q 0 z a a a xdU'a �za 3 � z 5 �zFoUz� o ra 3 oa¢ot, W a o o s U N z U ��w M a a W W C F � qq v� F Z vSaw a ,7 04 v (o U�z��a a W z o o z z z `¢ ¢ p z o s o a0 ¢z a F�zoo�a aU oV a a w zo ° U W) A <° �a$ a a r z r z� zo o0`�'r� U aq z' Z p ¢ z w awl W o oV 'C°U¢Cax z° ~ 9z 3 a C Cx � m A d zF� a x F < z W�0 O a a F � O� �Q W WU PG A z Z a < o 9z �Q 0 z a a a xdU'a �za 3 � z 5 �zFoUz� o ra 3 oa¢ot, W a o o s U N z U ��w M a a v� Z vSaw a z m33m�z 04 v (o U�z��a w� o° WSm WAO z �� a a �' a a W z o o z z z `¢ ¢ p z o s o a0 ¢z a F�zoo�a aU oV a a w zo ° U W) A <° �a$ a a r z r z� zo o0`�'r� U aq z' Z p ¢ z w awl W o oV 'C°U¢Cax z° ~ 9z 3 a C Cx � m A d zF� a x F < z W�0 O a a F � O� �Q W WU PG A z Z a < o 9z �Q 0 z a a a xdU'a �za 3 � z 5 �zFoUz� o ra 3 oa¢ot, W a o o s U N z U ��w M a a ORGANIZATION CHART PRECONSTRUCTION PHASE CITY OF SUNNY ISLES BEACH CITY HALL PROJECT NO. 01 -12 -02 SUNNY ISLES BEACH, FLORIDA VICE PRESIDENT MANAGER CONSTRUCTION PRECONSTRUCTION OPERATIONS GARY HENNINGS I TOM BORDEN PROJECT ESTIMATOR BOB STOUT PROJECT MANAGER JIM MARSHIANO CITY OF SUNNY ISLES BEACH El "r�r�1`�J `.l`JJr��• WEITZ DMJM OFFICE STAFF OVERVIEW PRECONSTRUCTION PHASE The following individuals will guide your firm throughout the preconstruction phase of this assignment. ij LEN MARTLING/DIVISION PRESIDENT Len is a graduate of Kent State University. He has more than 29 years of construction industry experience, 20 of them with our firm. Len has — supervised concurrent projects exceeding $400 million in construction cost since becoming Division President. He oversees all management activities associated with preconstruction, construction, marketing and accounting. Len also manages day -to -day activities related to resource allocation, quality of service provided, and client satisfaction. TOM BORDEN/MANAGER, CONSTRUCTION OPERATIONS Tom is a graduate of Colorado State University. He has more than 22 years of construction industry experience, 15 of them with our firm. In his role as the Manager of Construction Operations for our Florida Division, Tom is responsible for overseeing staffing assignments, employee training, and reviewing initial project plans as they relate to staging and logistics, cost and schedule analysis, quality and safety control, and owner and subcontractor negotiations. Most importantly, Tom will oversee the transition period from preconstruction to construction, assuring a smooth turnover. GARY HENNINGS/VICE PRESIDENT, PRECONSTRUCTION Gary is a graduate of the University of Nebraska. He has more than 26 years of construction industry experience, 25 of them with our firm. Gary was a catalyst in starting our Florida Division office more than 23 years ago. As Vice President of Preconstruction, Gary's responsibilities include managing and coordinating all aspects associated to preconstruction, including staffing assignments, design review, systems and cost analysis, to name a few. Gary has overseen preconstruction activities for more than 40 commercial office projects in South Florida including those for the City of Port St. Lucie, Motorola, South Florida Water Management, and Florida Power & Light. BOB STOUT/PROJECT ESTIMATOR Bob Stout is a graduate of the Cornell College. He has more than 25 years of construction industry experience, 4 of them with our firm. As Project Estimator, Bob will manage and coordinate all functions during Preconstruction, including budget estimating, digitized take -offs, document and scope review, value analysis, Subcontractor prequalification and solicitation, cost model preparation, and variance reporting, .to name a few. Bob has overseen the estimating process for a number of commercial office projects in both the private and public sectors. ij LEONARD W. M.A RTLING DIVISION PRESIDENT As President of the Florida Division of The Weitz Company, Len Martling oversees all management activities associated with preconstruction, construction, marketing, and accounting. Len is involved with all day -to -day activities including allocation of Division resources; quality of service provided; owner, public and subcontractor relations; and client satisfaction. EDUCATION - Kent State University, Bachelor of Arts in Economics AFFILIATIONS Current Member of Executive Association of West Palm Beach Current Member of Economic Council of The Palm Beaches Current Member of Association of General Contractors Current Member of the Board of Directors for Junior Achievement E'X PE' RIENCI? Len has more than 29 years of construction industry experience, 20 of which have been with our firm. In addition to his current role as President, Len has held the positions of Construction Manager, Project Manager, Field Engineer, and Area Superintendent. He is well versed with both large and small -scale design build, general construction, and construction management assignments. Len has overseen the construction and renovation of some of the most challenging assignments that our firm has built over the years. His project types include commercial office buildings, warehouse and distribution facilities, mid and high -rise structures, hotels and resorts, retail establishments, educational facilities, retirement communities, and multi - phased campus facilities, to name a few. In the three years that Len has been President of our Florida Division, he has supervised concurrent project's exceeding $400 million in construction cost. 1998 — Present President, The Weitz Company, Florida Division 1995-1998 President, The Weitz Company, Omaha Division 1993-1995 Vice President, The Weitz Company, National Division 1991-1993 Construction Manager, The Weitz Company, National Division 1988-1991 Project Manager, The Weitz Company, National Division 1986-1987 Project Superintendent, The Weitz Company, National Division 1984-1986 Project Manager, Al Cohen Construction Company 1983-1984 Assistant Project Manager, Al Cohen Construction Company 1981-1983 Assistant Superintendent, Al Cohen Construction Company 1971-1980 Self- Employed General Contractor TOM BORDEN MANAGER CONSTRUCTION OPERATIONS As Manager of Construction Operations for the Florida Division of The Weitz Company, Tom Borden is responsible for overseeing staffing assignments, initial project planning, cost and schedule analysis, owner and subcontractor negotiations, and employee training, to name a few. Most importantly, Tom will oversee the transition period from estimating to operations, assuring a smooth turnover. EDUCATION Colorado State University, Bachelor of Science in Industrial Construction Management, 1977 University of Delaware, Pre Dental /Biology, Athletic Scholarship, 1974 EXPERIENCE, Tom has been involved in the construction industry for more than 22 years, 15 of them with our firm. In addition to his current role as Construction Manager, Tom has held the positions of Senior Preconstruction Manager, Project Manager, Project Engineer, and Project Superintendent. Throughout his career, Tom has continually been asked to oversee some extremely challenging projects. He is well versed will both large and small -scale design/build, general construction, and construction management assignments. His completed projects include commercial office buildings, hotels and resorts, retail establishments, multi - family residences, senior living facilities, mid and high -rise structures, public facilities, and institutions. A partial listing of Tom's experience follows: PROJECT LIST PROJECT OWNER PROJECT SIZE Minto Las Olas Minto Communities 716,925 SF Luxury Apartment Tower 31 Story & Parking Structure 550,140 SF Tower Ft. Lauderdale, Florida 166,781 SF Parking 319 Units 509 Parking Spaces $45 Million The Breakers Hotel The Breakers Hotel of Palm Beach 56,000 SF South Tower Renovation 6 Story Palm Beach, Florida 72 Rooms $8 Million TOM BORDEN MANAGER GER CONSTRUCTION OPERATIONS PROJECT OWNER PROJECT SIZE Fairfield Inn & Suites @ Boca Boca Airport Hotel Partners 54,000 SF Executive Airport 4 story Boca Raton, Florida 120 Rooms $4.5 Million Clemente Center for Sports & Florida Institute of Technology 58,893 SF Recreation 3 Story Melbourne, Florida $6.8 Million Indian River Estates ACTS — Retirement Life 129,572 SF Assisted Living Facility Communities 3 Story Vero Beach, Florida $10.6 Million National Health Care National Health Care 20,341 SF Dementia Center 1 Story Jupiter, Florida 40 Units $2.1 Million The Breakers Hotel The Breakers Hotel of Palm Beach 37,746 SF Golf & Tennis Club 3 Story Palm Beach, Florida $7.2 Million Safeguard Self- Storage Safeguard Self- Storage 86,000 SF Coconut Creek, Florida 3 Story $2.9 Million Oakbrook Shopping Center & JMB /Urban Development 700,000 SF Parking Garage 4 Story PH. III Expansion 560 Parking Spaces Oakbrook, Illinois $25 Million Blakehurst Retirement Chestnut Partnership 327,381 SF Community 6 Story Towson, Maryland 177 Living Units $28.3 Million Principal Insurance Principal insurance Company 528,000 SF Corporate Headquarters 8 Story Expansion $65.3 Million Des Moines, Iowa Mountain Bell - City Center IV Argus Realty 1,500,000 SF Class "A" Office Building & 55 Story Parking Garage $94.5 Million Denver, Colorado Fe- TOMBORDEN MANAGER CONSTRUCTION ION OPERATIONS PROJECT OWNER PROJECT SIZE Security Life Center Beardsley Miller Properties, Inc. 393,420 SF Class "A" Office Tower & 16 Story Parking Garage 400 Parking Spaces Denver, Colorado $24.9 Million Ginger Cove Life Care Center Ginger Cove Life Care 393,000 SF Retirement Community 3 Story Anapolis, Maryland 243 Living Units $26.3 Million 373 Inverness Beardsley Miller Properties, Inc. 89,000 SF Office Building 2 Story Denver, Colorado $3.7 Million Terrace Tower I1 Jay Roulier Interests 250,000 SF Class "A" Office Tower & 12 Story Parking Garage $13.5 Million Denver, Colorado Plaza Tower I Chevron Land & Development 450,000 SF Office Tower & Parking Garage 22 Story Englewood, Colorado 1430 Parking Spaces $38 Million Lowell Thomas Law Library University of Denver 142,000 SF Denver, Colorado 3 Story Stapleton Airport City & County of Denver 65,000 SF Parking Structure, Core Building, 3 Story Overhead Walkways & Site Renovations Denver, Colorado Ball Corporation Ball Corporation 119,000 SF Aerospace Manufacturing Center 2 Story Westminster, Colorado $5.5 Million Aurora Criminal Justice Center Aurora Municipal Building 193,800 SF Aurora, Colorado Corporation 2 Story $21 Million TOM BORDEN MANAGER CONSTRUCTION OPERATIONS PROJECT OWNER PROJECT SIZE Kodak Corporation Kodak Corporation 285,000 SF Finishing Building 3 Story Windsor, Colorado Harrah's Marina Casino Harrah's Marina Casino 780,000 SF New Hotel & Gaming Facility 15 Story Atlantic City, New Jersey Calvert Memorial Hospital Calvert Memorial Hospital 80,000 SF Medical Center 3 Story Calvert, Maryland Providence Hospital Providence Hospital 66,000 SF Medical Center 2 Story Washington, D.C. Washington Hospital Washington Hospital 100,000 SF Miscellaneous Renovations Washington, D.C. Columbus Center City of Baltimore 24,000 SF Hall of Exploration 2 Story Baltimore, Maryland Baltimore Children's Museum City of Baltimore 86,000 SF Baltimore, Maryland 3 Story John Hopkins University John Hopkins University 90,000 SF School of Nursing 5 Story Baltimore, Maryland FDA Research Center FDA 20,000 SF Baltimore, Maryland GARY HENNINGS VICE PRESIDENT PRECONSTRUCTION As Vice President of Estimating for the Florida Division of The Weitz Company, Gary Hennings is responsible for managing and coordinating all aspects associated with preconstruction. His duties include staffing assignments, software implementation, digitized take -offs, budget estimating, value analysis, comparison and cost model reporting, cash flow analysis, and preliminary scheduling for design/build, general construction, and construction management assignments. Gary also oversees our firm's business acquisitions efforts. EDUCATION University of Nebraska, Bachelor of Science in Construction Management Drake University, Graduate School of Business in Des Moines, Iowa AFFILIATIONS Two -year recipient of the Association of General Contractors of America Scholarship Member of Tau Beta Pi Engineering Honor Society Board of Directors Member, Florida East Coast Chapter of Associated General Contractors, since 1993 Chairman of the AIA /AGC Joint Committee since 1990 EXPERIENCE Gary has more than 26 years of construction industry experience, 25 of them with our firm. He was a catalyst in starting our Florida Divisional Office in 1978 and has overseen the awards of all the projects this Division has constructed over the years. Gary's diversified experience includes commercial office and warehouse facilities, mid and high rise structures, multi - family residences, hotels and resorts, retail establishments, senior housing facilities, learning institutions, banks, churches, and multi -phase campus facilities, to name a few. The following list represents the total amount of projects that Gary has bid or negotiated for the Florida Division since 1982: PROJECT LIST YEAR BID PROJECTS NEGOTIATED PROJECTS 1982 $100,020,000 $41,900,000 1983 $120,811,000 $3,236,000 1984 $26,070,000 $4,216,000 NAL VICE PRESIDENT PRECONSTROCTION YEAR BID PROJECTS NEGOTIATED PROJECTS 1985 $58,335,000 $39,249,000 1986 $88,148,000 $46,586,000 1987 $97,692,000 $24,376,000 1988 $142,144,000 $103,274,000 1989 $147,852,000 $79,970,000 1990 $109,352,000 $21,886,000 1991 $134,348,000 $31,132,000 1992 $75,681,000 $57,615,000 1993 $133,985,000 $37,127,000 1994 $148,590,000 $48,947,000 1995 $121,450,000 $17,790,000 1996 $111,100,000 $63,553,000 1997 $148,855,000 $64,239,000 1998 $109,530,000 $119,995,000 1999 $102,462,000 $79,668,000 2000 $90,442,000 $448,140,000 TOTAL $1,854,875,000 $1,133,236,000 BOB STOUT SENIOR ESTIMATOR As Senior Estimator for the Florida Division of The Weitz Company, Bob Stout is responsible for managing and coordinating all functions related to preconstruction. Bob's duties include, but are not limited to, budget estimating, digitized take -offs, document and scope review, value analysis, Subcontractor prequalification and solicitation, comparison and cost model reporting, and variance reporting for design build, general construction, and construction management assignments. EDUCATION Bachelor of Arts Degree, Cornell College in 1971 State of Florida Certified General Contractor since 1996 EXPERIENCE Bob is experienced with both international and domestic construction projects. He has more than 25 years of industry experience, 4 of them with our firm. Prior to his current role as Senior Estimator, Bob worked as a Construction Manager, Project Manager, and Design Consultant. He was also a self - employed general contractor. Bob's extensive building experience includes both large and small -scale assignments. He has successfully contributed to the completion of myriad of building types including commercial office and manufacturing facilities, health and educational centers, retirement communities, retail establishments, mid and high -rise structures, and multi -phase campus style projects, to name few. A partial listing of Bob's experience follows. PROJECT LIST PROJECT OWNER PROJECT SIZE Norton Museum of Art Norton Museum of Art 45,957 SF West Palm Beach, Florida $13 Million Marriott at Sawgrass Mills Key International 214,414 SF Sunrise, Florida 14 Story $22.5 Million ORGANIZATION CHART CONSTRUCTION PHASE PROJECT ENGINEER BRIAN PIETRZYK CITY OF SUNNY ISLES BEACH CITY HALL PROJECT NO. 01 -12 -02 SUNNY ISLES BEACH, FLORIDA PROJECT MANAGER JIM MARSHIANO PROJECT SUPERINTENDENT DOUG JUST "As Building Official for the City of Port St. Lucie, I have had the opportunity to work with Weitz on 5 projects over the past several years. The quality of facilities built for the City has ' == been superb. Projects have consistently been completed on schedule and under budget." CITY OF PORT ST. LUCIE, Brian Hurley, 561 - 871 -5055 ❑ = OFF -SITE STAFF ❑ = ON -SITE STAFF PROJECT COORDINATOR TBA ON -SITE STAFF OVERVIEW CONSTRUCTION PHASE The following individuals will guide your firm throughout the construction phase of this assignment. JIM MARSHIANO/ PROJECT MANAGER Jim is a graduate of the University of Florida. He has more than 10 years of construction industry experience, 4 of them with our firm. As Project Manager, Jim is responsible for ensuring the overall success of the project during the construction phase. He will be the project team leader, coordinating and assuring that all communication between the owner, architect, engineers, subcontractors and field staff is administered and 4 distributed in a timely fashion. Jim will be actively involved during the '3- preconstruction phase. Jim has completed several commercial facilities, the most notable being the City of Port St. Lucie's $7 million City Hall. DOUG JUST/PROJECT SUPERINTENDENT Doug has more than 21 years of construction industry experience, 18 of them with our firm. As Project Superintendent, Doug will be the on -site representative with the authority to speak and make decisions for our firm. His responsibilities will include supervising all of the work that our firm puts in place in the field, managing all site quality and safety issues, on -site schedule management, staging and logistics planning, subcontractor coordination, and jobsite record - keeping, to name a few. Doug has constructed a number of challenging and multi faceted commercial projects with our firm. BRIAN PIETRZYK/PROJECT ENGINEER Brian is a graduate of the University of Florida where he received a r Bachelor of Science Degree in Construction. He has more than 5 years of construction industry experience, all of them with our firm. Brian's responsibilities will include contract administration, shop drawings solicitation and review, material expedition, detail project scheduling, engineering coordination. He will also be responsible for implementing Prolog Manager, our web based project management software used to expedite communication between the project team members. Brian has worked on a number of diverse project types since joining our firm. JIM MARSH IANO PROJECT MANAGER As Project Manager for the Florida Division of The Weitz Company, Jim Marshiano is responsible for ensuring the overall success of the project during the construction phase. His duties include scheduling and logistics planning; cost, quality and safety control; contract administration, and owner and subcontractor negotiation. Jim will be the project team leader, assuring that all communication between the owner, architect/engineer and field staff is administered in a timely and orderly fashion. EDUCATION University of Florida, B.S. Building Construction, 1997 30 -Hour OSHA Certification Course Indian River Community College, A.A. - Ft. Pierce, Florida State University of New York, A.S. - Delhi, New York Licensed Florida General Contractor, License #CG C059954 EXPERIENCE Mr. Marshiano has more than 10 years of construction industry experience, 4 of them with our firm. Prior to his current role as Project Manager, he has held the positions of Assistant Project Manager and Project Engineer. Jim has successfully contributed to the completion of both large and small -scale design/build, general construction, and construction management assignments. His project types include commercial office buildings, senior living facilities, educational centers, retail establishments, and multi -phase campus style projects, to name a few. A partial listing of Jim's experience follows. PROJECT LIST PROJECT OWNER PROJECT SIZE City Hall City of Port St. Lucie 70,000 SF Port St. Lucie, Florida 3 Story $7.6 Million Clemente Center for Sports & Florida Institute of Technology 58,893 SF Recreation 2 Story Melbourne, Florida $6.8 Million JIM MARSHIANO PROJECT MANAGER PROJECT OWNER PROJECT SIZE Indian River Estates ACTS — Retirement Life 129,572 SF Assisted Living Facility Communities 3 Story Vero Beach, Florida $11 Million QVC Call Center QVC St. Lucie, Inc. 53,232 SF Port St. Lucie, Florida 2 Story $5.9 Million Las Olas Riverfront Michael Swerdlow Companies 300,000 SF Mixed -use Retail Center $19 Million Ft. Lauderdale, Florida NHC Place National Health Care 20,341 SF Dementia Center $2.2 Million Jupiter, Florida PBCC Humanities Building 120 Palm Beach Community College 26,500 SF Lake Worth, Florida $2.5 Million Pointe Orlando Pointe Orlando Development 478,000 SF Mixed -use Retail Center Company $40 Million Orlando, Florida Pembroke Crossing Michael Swerdlow Companies 243,000 SF Mixed -use Retail Center $16 Million Ft. Lauderdale, Florida Whispering Pines Gym City of Port St. Lucie 9,513 SF Port St. Lucie, Florida $760,000 • • • • • DOUG JUST PROJECT SUPERINTENDENT As Project Superintendent for the Florida Division of The Weitz Company, Doug Just is responsible for supervising all of the work that our firm puts in place in the field, including that of our subcontractors. Additional duties include managing all site quality and safety issues, on- site schedule management, staging and logistics planning, subcontractor coordination, and jobsite record - keeping. In general, our Project Superintendent is the on -site representative with the authority to speak and make decisions for our firm. EDUCATION Iowa Western Community College, A.A Business, 1980 1992 O.S.H.A. Standards for the Construction Industry — Update A.G.C. Apprenticeship EXPERIENCE Mr. Just has more than 21 years of construction industry experience, 18 of them with The Weitz Company. Prior to his current role as Project Superintendent, Doug held the positions of Assistant Superintendent, Carpenter Foreman, and Labor Foreman. Doug's extensive building experience includes both new construction and renovation projects. He is well versed with design /build, general construction, and construction management assignments. His projects have ranged in size and complexity and include commercial office buildings, warehouse and manufacturing facilities, hotels and resorts, retail establishments, educational centers, retirement communities, country clubs, and multi -phase campus style projects, to name just few. A partial listing of Doug's experience follows. PROJECT LIST PROJECT OWNER PROJECT SIZE Jupiter Community Center Town of Jupiter 69,484 SF Includes two gymnasiums, 2 Story classrooms, and administrative $10.3 Million Jupiter, Florida Charles & Ruth Clemente Center Florida Institute of Technology 58,893 SF for Sports & Recreation 2 Story Melbourne, Florida $6.8 Million 19 DOUG JUST PROJECT SUPERINTENDENT PROJECT OWNER PROJECT SIZE Kravis Center City of West Palm Beach 312,000 SF Parking Garage 5 Story West Palm Beach, Florida 1,230 Spaces $6.5 Million Harbour's Edge — PH. I Linton Intracoastal Corporation 426,000 SF Retirement Community 6 Story Delray Beach, Florida 153 Units $28 Million Harbour's Edge — PH. 11 Linton Intracoastal Corporation 336,890 SF Retirement Community 6 Story Delray Beach, Florida 123 Living Units 24 Nursing Beds $18.4 Million The Ritz Carlton Melvin Simon & Associates 427,700 SF 5 Star Hotel & Parking Structure 6 Story Manalapan, Florida 300 Rooms 300 Space Parking $35.6 Million Sandhill Cove — PH. I Life Care Services, Inc. 302,000 SF Retirement Community 3 Story Stuart, Florida 166 Units 30 Nursing Beds $21 Million Sandhill Cove — PH. II Life Care Services 52,985 SF Assisted Living Center 3 Story Stuart, Florida $5.4 Million Arden Courts Manor Care, Inc. 24,770 SF Alzheimer Facility 1 Story West Palm Beach, Florida 56 Beds $2.1 Million Manor Care Manor Care, Inc. 25,000 SF Skilled Nursing Facility 1 Story Delray Beach, Florida 52 Beds $1.8 Million Manor Care Manor Care, Inc. 74,650 SF Nursing Home Fcaility 1 Story Delray Beach, Florida 120 Beds DODO JUST PROJECT SUPERINTENDENT PROJECT OWNER PROJECT SIZE Wellington High School School Board of Palm Beach County 278,000 SF Wellington, Florida I Story $21 Million Redemptive Life Fellowship Redemptive Life Fellowship 42,700 SF PH. & & II $2.7 Million West Palm Beach, Florida Sandler Residence Harvey Sandler 20,000 SF Boca Raton, Florida $5 Million BRIAN PIETRZYK PROJECT ENGINEER. As Project Engineer for the Florida Division of The Weitz Company, Brian Pietrzyk is responsible for contract management, material expedition, detail project scheduling, shop drawing solicitation and review, and engineering coordination. Brian will also implement and oversee Prolog Manager, our firm's web based project management software used to expedite communication during construction. EDUCATION B.S. Building Construction, University of Florida, 1998 OSHA 10 -hour Construction Safety Certified EXPERIENCE Brian Pietrzyk has more than 5 years of construction industry experience, all of them with our firm. He joined us as an intern in 1996 and became a full -time employee after he completed his degree in Building Construction at the University of Florida. Brian has actively participated in a myriad of project types, including educational facilities, community centers, religious facilities, retail establishments, office and warehouse facilities, and retirement communities. A partial listing of Brian's experience follows. PROJECT LIST PROJECT OWNER PROJECT SIZE Jupiter Community Center Town of Jupiter 69,484 SF Includes two gymnasiums, 2 Story classrooms, and administrative $10.3 Million Jupiter, Florida Charles & Ruth Clemente Center Florida Institute of Technology 58,893 SF for Sports & Recreation 2 Story Melbourne, Florida $6.8 Million Sandhill Cove — PH. II Life Care Services 52,985 SF Assisted Living Center 3 Story Stuart, Florida $5.4 Million PBAC Recreation Center Palm Beach Community College 61,000 SF West Palm Beach, Florida 2 Story $5.5 Million BRIAN PIETRZYK PROJECT ENGINEER McKeen Towers LNM Residence for Geriatric Care 245,200 SF Palm Beach, Florida 15 Story $22 Million Family Life & Recreation Center First Baptist Church of 47,740 SF Includes gymnasium, West Palm Beach 4 Story classrooms, congregation & $4.9 Million administrative West Palm Beach, Florida Walgreens Pharmacy Linton Jog Associates, LTD. 15,120 SF Delray Beach, Florida $1.6 Million Versachem Gaeta Development 70,000 SF Office/Warehouse 2 Story Riviera Beach, Florida $2.6 Million PORT ST. LUCIE CITY HALL Port St. Lucie, Florida FACILITY TYPE City Hall CLIENT City of Port St. Lucie Port St. Lucie, Florida SIZE 70, 000 s. f. DESIGNER STH Architectural Group West Palm Beach, Florida FEATURES Built using the design -build method, the three -story concrete and masonry structure serves as the hub of the municipal complex, housing the city's administrative offices, utility department and building /zoning divisions. The exterior facade of stucco, cement tile roof and awning features bring a simple sophistication to the multi - building facility. The council chamber seats 154 and offers full audio- visual presentation capabilities. FACILITY TYPE Office building SOUTH FLORIDA WATER MANAGEMENT West Palm Beach, Florida CLIENT South Florida Water Management West Palm Beach, Florida DESIGNER Spillis Candela & Partners, Inc. Coral Gables, Florida SIZE 146,290 s. f. 3 Story FEATURES An 80 -foot steel arched canopy covers the courtyard of this 3 -story office building. The structure, which has a flat plate concrete frame, features a full- service cafeteria and auditorium with TV production capabilities. Xeriscaping, a wetland landscaping technique that utilizes native plants requiring little maintenance, highlights the 2 -acre man -made lake in front of the building. • • • • • • 800 FAIRWAY DRIVE Deerfield Beach, Florida FACILITY TYPE: Office /research building CLIENT: SDK Industrial Parks Draper & Kramer, Inc. Chicago, Illinois DESIGNER Soloman, Cordwell, Buenz & Associates, Inc. Chicago, Illinois SIZE 177, 000 s. f. office 190, 000 s. f, parking garage FEATURES This office /research building and parking garage is conveniently located off 1 -95 between two major airports. The office building is clad in blue reflective glass, and features a four -story atrium. The building also contains computerized systems for lighting, heating, and cooling control. The adjacent split -level parking garage houses space for 480 vehicles. MOTOROLA EXPANSION Plantation, Florida FACILITY TYPE Manufacturing /Distribution /Office CLIENT Motorola, Inc. Schaumburg, Illinois ARCHITECT Schwab, Twitty & Hanser Architectural Group, Inc. West Palm Beach, Florida SIZE 268, 000 s. f. FEATURES This new two story addition used for the manufacturing of Nextel's two -way radio /phone, required maintaining operations of the existing Motorola facility. The structure consisted of steel frame and composite concrete decks with texture or precast wall panels. The facility expansion included a 100,000 s. f. ground floor manufacturing area and 34,000 s.f. shipping and receiving dock. The second floor was designed for future use as an additional manufacturing area, but at present it has been built out as 130,000 s. f. of office space. The roof deck was also designed for future use, allowing an additional floor to be added to the manufacturing plant. New systems such as anti- static flooring, computer rooms, sound -proof test chambers, 1.4 million gallon thermal storage tank, and a complete 77 acre site /landscape restoration were included. QVC REGIONAL CALL CENTER Port St. Lucie, Florida FACILITY TYPE Office / Call Center CLIENT QVC, Inc West Chester, Pennsylvania DESIGNER STH Architectural Group West Palm Beach, Florida SIZE 52, 000 s. f. FEATURES Using a design -build delivery method, this fast track project was designed and constructed in 7 months utilizing concrete tilt wall exterior and structural steel. The call center has 600 workstations, offices, training rooms, and employee cafeteria with commercial kitchen. Data and communications cabling systems include more than 120 miles of wiring. COMMUNITY FOUNDATION HEADQUARTERS West Palm Beach, Florida FACILITY TYPE Commercial Office CLIENT The Community Foundation for the Palm Beaches & Martin Counties West Palm Beach, Florida DESIGNER Portoundo Perrotti Architects Miami, Florida SIZE 33,514 s. f. 2 Story FEATURES Situated in downtown West Palm Beach, this new two story Class "A" office building showcases many Old World architectural details such as groin and barrel vaulted ceilings, French doors and windows, and authentic cobblestone pavers. At the core of the 33,514 s.f. structure is an open -air courtyard, boasting an Italian limestone fountain and a grand stair with wrought iron railings. Tenants have access to all of the building's amenities including a 1,300 s.f. community room wired for audio /visual presentations and high -speed Internet access; a warming kitchen and serving area for catered functions; and a large balcony fully equipped to support lighting and sound systems for special events. PROJECT NAME & LOCATION: CLASSIC RESIDENCE BY HYATT PROJECT FUNCTION: Adult Congregate Living Facility & Health Center FIRM RESPONSIBILITY: Construction Manager - Negotiated GMP PROJECT OWNER: Classic Residence by Hyatt 200 West Madison Avenue, Chicago, Illinois 60606 Mr. John Hoover Phone: 312- 750 -8123 PROJECT ARCHITECT: Mouriz Salazar Architects 515 N. Flagler Drive, West Palm Beach, Florida 33401 Mr. George Mouriz Phone: 305 - 273 -9911 COMPLETION DATE: February 2003 PROJECT SIZE: 645,508 Sq. Ft., Two - 23 Story Towers, 4 Buildings PROJECT COST: $59,000,000 PROJECT TYPE: New Construction STAFF RESPONSIBILITIES: Preconstruction & Construction KEY PROFESSIONALS: Gary Hennings, Bob Stout, Jon Craig, David Swiercinski PROJECT STATUS DESCRIPTION: Situated on a tight 4.3 acre golf course site this unique Adult Congregate Living Community features four buildings; two resi- dential towers, a large amenities building, and health center, all over a one story enclosed parking structure able to accomodate 316 vehicles. Weitz provided 12 months of preconstruction serv- ices to assist the owner with bringing the project within the budg- etary requirements. Extensive value analysis returned $1,350,000 in savings to the owner. This marks the 4th consec- utive project our firm has constructed for Chicago based Hyatt. COHEN AURORA MUNICIPAL JUSTICE CENTER Aurora, Colorado FACILITY TYPE Courthouse, detention facility, and police dispatch center CLIENT Aurora Colorado Municipal Building Corporation DESIGNER Skidmore, Owings and Merrill SIZE 193,800 sf FEATURES This prominent award - winning facility, selected as one of the top ten buildings built in Colorado since World War ll, has set new standards for design and construction. It contains the largest precast concrete dome structure in North America. It holds the capacity for 15 courtrooms, 108 detention facility cells, and extensive office space. The facility is primarily precast, with the structural elements of precast in the court- rooms, cast -in -place concrete in the detention center, and structural steel in the police addition. COHEN ARIZONA STATE COURTS Phoenix, Arizona FACILITY TYPE Judicial /office building CLIENT State of Arizona Department of Administration Phoenix, Arizona DESIGNER Howard Needles Tammen & Bergendoff Phoenix, Arizona SIZE 258,000 sf FEATURES Combining traditional materials with contemporary design, the Arizona State Courts building provides a monumental look for the State Supreme Court and Court of Appeals. The 4 -story steel frame building features an exterior facade of pink granite, smooth and sculptured limestone, and a glass curtain wall system. Interior features include extensive use of Honduran mahogany millwork and casework, bronze rails and entry doors, and granite flooring in the 2 -story rotunda lobby. The unique mechanical system consists of two ice - harvesting machines that produce and store ice during off -hours for use during peak energy periods. PRINCIPAL CORPORATE EXPANSION Des Moines, Iowa Photograph by Rich Heki, Principal Financial Group FACILITY TYPE Office Building CLIENT Principal Financial Group Des Moines, Iowa ARCHITECT Murphy Jahn Chicago, Illinois SIZE 528, 000 sf FEATURES Weitz was selected to be the general contractor upon completion of a competitive value engineering process on this bid project. The building consists of a structural steel frame, composite concrete floor slabs with 100% electrified metal floor deck and drilled caisson foundations. Key interior elements include a Wellness Center and associated locker rooms, ornamental stairs incorporating stainless steel, terrazzo and glass, a full service cafeteria with a commercial kitchen, and a computer room. The exterior wall enclosure consists of four types of aluminum /glass /limestone curtainwall systems. Sitework includes four different types of plaza pavers, a monumental stair /feature wall and a fog wall. The new building was connected to the original campus via a glass enclosed skywalk and an underground service tunnel. EMPIRE FIRE AND MARINE INSURANCE CORPORATE HEADQUARTERS Omaha, Nebraska FACILITY TYPE Office Building and Interior Finishes CLIENT Noddle Development Company Omaha, Nebraska DESIGNER Gensler & Associates Denver, Colorado SIZE 128, 000 s. f. FEATURES This 5 -story steel frame office facility was completed in only 11 months including all interior finishes for tenant occupancy. Located in the prestigious First National Business Park in west Omaha, Weitz worked under a team approach with the developer, designers, and tenant to achieve occupancy on time and under budget despite numerous changes and difficult winter conditions. Fast -track construction was used to allow full construction to proceed while design and engineering was completed. This required extensive management to assure all requirements were met without all information available. Weitz achieved this goal beyond expectations. .c ICG CORPORATE HEADQUARTERS Englewood, Colorado tea. FACILITY TYPE Office /Light Manufacturing CLIENT ICG Communications, Inc. Englewood, Colorado DESIGNER C. W. Fentress /J. H. Bradburn & Associates Denver, Colorado SIZE 259, 000 s. f. FEATURES This 7 -story building includes a service reliability center and computer support for all of ICG'- fiber lines and switches across the country. At its peak, the project employed over 230 construction workers. This fast -track project was completed in just 320 days. AT&T BROADBAND AND INTERNET SERVICES (BIS) Englewood, Colorado FACILITY TYPE Office Building Parking Structure CLIENT TCI Denver, Colorado DESIGNER Michael Barber Architecture Denver, Colorado SIZE 288,015 s. f. (office) 171,000 s.f. (garage) FEATURES This 288,015 square foot office building will be the new headquarters for the telecommunications company, AT &T Broadband and Internet Services, formerly the TCI Corporate Campus. This unique building is completely circular and consists of two garage levels and two office levels. The circular plan is consciously non - hierarchical as it is anticipated that it will encourage interaction among all employees. The courtyard is one acre and provides a variety of outdoor spaces for informal gathering, dining, and presentations. The structure is composed of precast concrete and structural steel. Exterior walls consist of aluminum framed glass curtainwall. Both courtyard and exterior walls are composed of this glass, creating an open, well -lit office space. The clerestory curtainwall brings light into the two -story circulation space and into other interior office areas. COHEN ABACUS TOWER Phoenix, Arizona FACILITY TYPE Office building CLIENT The Lee Company Phoenix, Arizona DESIGNER Allen & Philp Architects, Inc. Phoenix, Arizona SIZE 270,000 SF office space 270,000 SF garage space FEATURES This striking, 14 -story shell office building includes a four -story atrium, a three -story basement parking garage, and a rooftop helipad. The building is constructed of poured -in -place concrete with a glass curtain wall exterior. Stainless steel and gran- ite are used as accents. • • • • • • `� EXEC CENTRE OFFICE BUILDING Omaha, Nebraska FACILITY TYPE Office Building CLIENT Wiesman Development Omaha, Nebraska DESIGNER Davis Design Omaha, Nebraska SIZE 82,600 s. f. FEATURES Originally, this project was competitively budgeted by a number of firms. Then, one year later, the developer brought Weitz on under a negotiated team - approach basis. Plan review, constructability, and aggressive value analysis services were provided to minimize cost of construction and schedule duration through creative options without sacrificing aesthetics or quality. More than 8% savings was achieved under the original year -old construction budget through these efforts. This 5- story, cassion foundation, steel frame, EIFS exterior core and shell base building was completed in only 10 months. Eight months into construction, Weitz accelerated the completion by over one month through shift work, weekends, schedule interdependencies, and aggressive on -site management to meet devel- oper /tenant requirements. Weitz also completed the majority of the interior tenant improvement work for this facility. N TOM MCI TELECOMMUNICATION, INC. Colorado Springs, Colorado FACILITY TYPE Corporate Offices CLIENT MCI Telecommunications, Inc. Colorado Springs, Colorado DESIGNER Gensler & Associates /Architects Denver, Colorado SIZE 780, 000 sf FEATURES This stunning facility of new and renovated buildings, located at the base of Pikes Peak, was completed over a four year period in five phases. Housing over 3,500 systems engineers, the building consists of precast con- crete and steel structures with Colorado sandstone and custom curtain wall enclosures, surrounded by 65 acres of landscaping. All the buildings are interconnected with multiple high profile entrances to accommodate short access distances for employees. cm COHEN PLAZA TOWER 1 Englewood, Colorado •Liu, upµ FACILITY TYPE Office /retail CLIENT Chevron Land and Development Co. •' San Ramon, California • j�.�., DESIGNER WZMH Group Denver, Colorado SIZE 525, 000 sf office /retail r488, 000 sf structured parking ' FEATURES This suburban mixed -use project includes a 22 -story • office building, 10, 000 sf of retail, a 25, 000 sf geophysical laboratory, and a 1400 space parking • structure. The construction of this building incorporates large barrel vaulted glazing, as well as polished granite slabs imbedded in the precast concrete skin. Construction • was coordinated around an existing highway overpass which remained open throughout the construction . schedule. COHEN THE CENTRUM Englewood, Colorado FACILITY TYPE Office building CLIENT Daniel Crow Interests Englewood, Colorado DESIGNER WZMH Group Denver, Colorado SIZE 336,000 sf FEATURES This 6 -story addition to a medical building was con- structed of a precast concrete frame and glass curtain wall. Original medical offices were kept functional while the exterior skin of the building was replaced. The project includes 3 levels of below grade parking for 980 vehicles. AGAVE CENTER OFFICE BUILDING Tempe, Arizona FACILITY TYPE Office Building CLIENT Gerding/Edlen Development Company Portland, Oregon DESIGNER DFD Architecture Phoenix, Arizona SIZE 80, 000 s. f. FEATURES This four -story Class A office building is located in Tempe, Arizona at the Agave Business Park. The building is composed of a steel frame, composite deck, built up roof and GFRC panels. The lobby features sandstone, slate and wood paneling with a grand staircase as the center feature. To meet the City of Tempe's beautification codes, the building includes exterior artwork. During the preconstruction phase, Weitz was able to save the Owner over $500,000 through value analysis. �I11 a. nni ti n� VIII CRESCENT Englewood, Colorado 11 RRIt� RR Rp _R' P FACILITY TYPE Office Building CLIENT Denver Technological Center Englewood, Colorado DESIGNER Michael Barber P.C. Architecture Denver, Colorado SIZE 90,700 s. f. FEATURES Schedule was the driving force behind this 4 story precast office building. Fast tracking the project, Weitz constructed and made ready for occupancy over 90,000 square foot of space in just under seven months. The 14 acre project site showcases a fountain, an amphitheater and a bike path. MORRISON- KNUDSEN BUILDING AT THE JEFFERSON CORPORATE CENTER Littleton. Colorado f. FACILITY TYPE Office Building CLIENT Morrison - Knudsen Corporation Boise, Idaho DESIGNER M +O +A Architectural Partnership Denver, Colorado SIZE 71,555 s. f. FEATURES This build -to -suit, three - story, office building consists of a structural steel frame with an exterior of metal stud framing and face brick. A distinctive aspect of the Morrison - Knudsen Building's design is its hinge- shape, featuring a curved section in the middle connecting the East and West wings. SHERIDAN PLAZA AT INVERNESS Englewood, Colorado FACILITY TYPE Office Building CLIENT Sheridan Amerivest Denver, Colorado DESIGNER Thomas Savory Architect Denver, Colorado SIZE 164, 000 s. f. FEATURES This distinctive project includes two 82,000 s. f. office buildings with underground and surface parking. Both four -story buildings are situated on a beautifully landscaped plaza. Each building features a two -story atrium; common area conference rooms; and high -speed data, voice and internet access. The interior design includes high -end finishes such as cherry wood and limestone with modern light fixtures adding a contemporary appeal. The award winning exterior precast is highlighted by a five -foot high cornice and a covered entryway. METRO CORPORATE PARK C (DESERT CANYON ONE) Phoenix, Arizona FACILITY TYPE Office CLIENT Alter Design Builders Lincolnwood, Illinois DESIGNER Gromatzky Dupree and Associates Phoenix, Arizona SIZE 101,000 s. f. FEATURES This three - story, steel framed building is clad with an EIFS and metal accent system skin accented with ribbon windows and architectural aluminum cladding details. The lobby finishes include mahogany millwork and aluminum trims along with a graphite tile floor. • • • PROJECT APPROACH OUR PHILOSOPHY For more than a 147 years, The Weitz Company has been committed to providing quality construction for projects varying in both size and complexity. Three key performance standards summarize our philosophy and are the guidelines used daily by all of our employees nationwide. • WE ARE CUSTOMER - ORIENTED • WE STRIVE FOR SUPERIOR PERFORMANCE • WE WANT TO BE KNOWN AS ABSOLUTELY RELIABLE From preconstruction to closure, it is our belief that planning is the foundation of successful construction projects. Regardless of the delivery method chosen, our firm strongly supports and suggests using a team approach. To that end, we have structured our organization in such a way that your project will receive the involvement of both our on -site supervisors as well as top management personnel. A brief overview of our proven methods during the design/development, construction, and post construction phases follows. COMMUNICATION TOOLS PROJECT CONTROL SYSTEM: We will implement our patented Project Control System (PCS) to facilitate the project organization, communication, and progress of the project. PCS notebooks will be issued to all principal Team Members at the beginning of the project. This system will be used to organize checklists, scope definitions, tracking charts, and all documentation associated with the project. It will allow the Project Team to discuss and monitor important details throughout the course of preconstruction and construction. The PCS facilitates communication and action between Team members and assures that the Owner is well informed as to the project's progress. Prolog Manager Project C-m 1&t —fur Windows • • • • • • ® 1 nnaecr coh Mstmt 7Ii PROLOG MANAGER: We will maintain an Intranet, which will be easily accessible by the entire Project Team. Prolog Manager is the ultimate computer software program for complete project control. It is unique because it is easy to use and emulates the way construction professionals traditionally track and manage project information. This software program, which is linked from our West Palm Beach Office to the jobsites, tracks nearly all phases of the project and provides real -time updates and instantaneous communication among all parties involved. It combines cost control, project engineering, and site related issues. We use it for project tracking, contract issues, change orders, submittals, RFI's, scheduling, and punch -list closure. PROJECT APPROACH PROLOG WEBSITE: At the request of the Owner, we will establish a website specifically for the project. It will interface directly with the Prolog Management Program referenced earlier. We will enter data directly into a project database, receive timely responses, and prepare "real- time" reports all via your Web browser. We will post all information to the site such as drawings, photos, and documents. A Web cam can be established at the project site so you can watch your project's progress on -line. PRECONSTRUCTION PHASE CONSULTATION: Our first priority, through cooperative effort, is to assist with the establishment of common goals and milestones in order to arrive at mutually agreed upon requirements and expectations. User requirements Disclaimer Powered b I WEBSITE CopYi�9�1. 1999-2000 MM.d F .M� SYab 1K During this initial consultation, and throughout the entire preconstruction and construction process, we will recommend construction feasibility and time requirements for various functions of the project. SYSTEMS & MARKET ANALYSIS: Prior to putting a pencil to the paper, we will identify and discuss building system options and alternates in conjunction with specific project requirements. We will assist with the evaluation of material and equipment life cycles, and submit recommendations for Team approval. We will also review the market trends to determine the availability of materials and labor. We will provide input regarding local, regional, and national issues that may affect the cost and schedule. REVIEW OF PLANS AND SPECIFICATIONS: Once a building system is chosen, we will participate with you and your Designers to develop schematic, design development, and construction documents. By doing this, we will ensure the design is completed in such a way that it maximizes quality, minimizes cost, and optimizes the construction duration. As design progresses, we will review, in detail, the drawings and specifications for construction sequencing, detail feasibility, and schedule /cost effectiveness. "CLOSURE DOCUMENTS ": Our Estimating Department is proficient at ® preparing initial estimates from preliminary concept sketches. We will compare the specifics of your project with those of similar past projects. These comparisons will be made at various stages of design, most commonly at the schematic, design/development, and construction document phases. The information gathered will be organized and presented to the Project Team in a "Closure Document ". More than just simple comparisons, this document contains all of the CLOSURE - - -- -- - -- details relevant to the project's construction materials, methods, cost, DOCUMENT and schedule for that milestone in the design phase. We developed the "Closure Document" in order to apply the knowledge gained from our experiences of the past. We use the "Closure Document" as a communication tool for the benefit of the Project Team. PROJECT APPROACH SCOPE OF WORK CHECKLISTS: Each "Closure Document" begins with a Scope of Work Checklist. This list contains all of the work and materials that would be needed if the facility were built at that point in time ... from sidewalks and curbs to windowsills and light fixtures. This list is what the remainder of the "Closure Document" is based on. It ensures that all the Project Team members are working with the same consistent information. DIGITIZED TAKE -OFFS: Our staff will begin each budget with a digitized take -off utilizing a Windows based digitized software called "Pro Plus ". We will also use historical data and select Subcontractor input to complete the early stages of a budget estimate. PARAMETERIBUDGET ESTIMATES: To provide accurate estimate pricing and summarization, we will utilize a Windows based software program called "WinEst Pro ". These estimates will be separated by area of use and building section... structure, enclosure, interior finishes, mechanical systems, electrical, etc. COMPARISON REPORTS: Once the initial budget is prepared, and after each budget update, we will compare the system component costs of the project to the actual cost of similar projects. These system costs are time and location adjusted to allow for a more accurate and meaningful comparison. COST MODELS: We will plot the information gathered in the Comparison Report and produce a computer generated Cost Model. The Model will quickly help to identify any potential problem areas as they relate to cost. For example, if the price per square foot of the interior finishes in your facility is significantly higher than that of a similar project, this graph will identify this condition. The Team can then discuss the reasons for the difference in cost, and if required, take the proper steps to reduce those costs. VARIANCE REPORTS: To ensure that your project remains within your budget as design progresses and becomes more detailed, we will generate a Variance Report to illustrate the variances in each division of work. This Report will note any changes made from the initial estimate and give a brief explanation as to why the cost increased or decreased. "We selected WEITZ to manage the construction of our new five story Neiman Marcus Store on Worth Avenue in Palm Beach. Little did they know they'd have Hurricane Irene to contend with. The fact that they poured 5,000 yards of concrete the day following the storm was truly incredible. Their team worked from Sunday morning at 1 a.m. to the following Monday night at 4 p.m. Their handling of logistics and coordination with Town officials was simply outstanding." Donald W. Jones, Vice President THE GOODMAN COMPANY VALUE ANALYSIS: Throughout the duration of the budgeting phase, we will continually offer value added suggestions that could potentially reduce the cost and schedule durations without jeopardizing the facilities unique design features. This Value Analysis Report will be prepared and presented according to the area of use. This procedure will give the Owner and Project Team an opportunity to make informed cost versus benefit decisions. We will then revise the estimate and schedule to reflect any changes chosen at that time. PROJECT APPROACH CLARIFICATIONS TO SCOPE OF WORK. With each updated estimate, we will provide a detailed list of Clarifications and Exclusions as backup to the estimate at its current stage. It is presented in a standard 16 Division CSI format as supplemental information to the Architect's specifications. SCHEDULING: As part of our "Closure Document ", we will prepare a Master Schedule, using an integrated state of the art planning, scheduling, and expediting system known as "Primavera SureTrak. Our initial t preconstruction schedule will be developed to coordinate and integrate J "� the Design Team's activities with the approval planning issues and construction schedule. DEVELOP TRADE CONTRACTOR INTEREST: We will prepare - - - -• , prequalification criteria for Subcontractors and Suppliers to establish bid SO� lists. We will distribute and receive bids and compile the most qualified hW M=W prices and schedules. Using an "Open Book" approach, we will present, 2A analyze, and make recommendations to the Owner prior to procuring the work. PRE -AWARD OF KEY SUBCONTRACTORS: We will identify key Subcontractors to be pre- awarded, and determine the minimum amount of documentation needed to initiate pricing of critical long -lead items. We will then solicit, receive, and analyze bids from vendors, and work together with the Project Team to award these key trades. The purpose of the pre -award phase is to ensure on -time delivery for field installation. CONTRACT DOCUMENT COORDINATION. We will provide recommendations on the division and scope of work for purposes of awarding trade contracts. We will consider such items as factors of labor availability, overlapping trades, time of performance, and temporary facilities. At the same time, we will review contract documents to eliminate areas of conflict or overlap in the work performed. REQUIREMENTS OF REGULATORY AGENCIES: We will assist the Owner in working with various governing agencies as required during the project. If necessary, we will also assist with the selection of various consultants to be used during design development or actual construction. CONSTRUCTION PHASE PROJECT CONTROL/MANAGEMENT. Your project will be staffed with a competent full -time staff to monitor the work, maintain the progress of the trade contractors, and coordinate activities and responsibilities of the Owner, Architect, and Consultants. WEEKLYMEETINGS: We will hold regular meetings throughout the Preconstruction and Construction Phases of your project. Once your project enters the Construction Phase, our coordination meetings become more frequent. We will hold weekly meetings with all Subcontractors and trade foremen to ensure that we anticipate, rather than react to potential problems. The schedule will be reviewed weekly on the basis of information provided at these meetings. Written minutes will be prepared and distributed to all Team members for review and comment. PROJECT'' APPROACH SCHEDULE MONITORING: We will monitor and update the master schedule regularly as construction progresses. We will identify variances between field progress and scheduled completion dates. We will determine the adequacy of the trade contractor's personnel and equipment, and the availability of materials and supplies to meet the schedule. Critical activity sequences and accelerated planning efforts will be identified to ensure the schedule is maintained. In the event of unanticipated changes in field activities, we will reschedule the balance of the project to assure completion within the original time frame. SHORT INTERVAL SCHEDULING: Each week our Superintendent will prepare a schedule of the work for the next two weeks. We call this function our "Two -Week Look Ahead Schedule ". Generally, this is done prior to a job meeting and then distributed at the meeting. This schedule will reflect the daily activities of all trades on the job for that time period. "WEITZ has been our exclusive contractor for many years because of their integrity, commitment to quality, and performance. It would be impossible to complete our projects on schedule, on budget, and in accordance with quality specifications, without an extraordinary level of teamwork between our organizations ... we share common values and culture of excellence." SHOP DRAWINGS AND SAMPLES: In collaboration with the Architect/Engineer, we will establish and implement procedures to expedite processing and approval of shop drawings and samples. We will define a schedule for submitting trade contractor's shop drawings and material submittals to allow for timely approvals and delivery of materials. This process will be closely monitored to avoid unnecessary project compromises and delays. REQUESTS FOR INFORMATION AND CHANGE ORDERS: Our goal is to always try to eliminate change orders by getting involved early in the project and work through the design process. There are, however, times when changes do occur. When this happens, we will implement a system to review and process change orders. We will recommend necessary or desirable changes, review requests for changes, submit recommendations to the Owner and Architect, and monitor the revisions. Paul Leone, President SUBCONTRACTOR AND MATERIAL STATUS REPORT THE BREAKERS OF PALM BEACH (SMSR): We will implement our SMSR report. It will provide the Project Team and management staff with a method of tracking the purchasing, shop drawings and submittals, material delivery, and Subcontractor installation processes. This report is a communication tool for all parties involved with the project including the Owner, Architect, Engineers, Subcontractors and Suppliers. The SMSR is also the source document for Project Close -Out. MONTHLY PROJECT STATUS REPORT. We will implement our Monthly Project Status Report, which will be used to summarize the financial, scheduling, and operational status of the project under construction on a monthly basis. Its sole purpose is to summarize the project for the Division Manager so he can quickly survey the project's progress during the past month. The report will flag any problem areas needing further review of detailed information by our management staff. PROJECT APPROACH QUALITY CONTROL & ADHERENCE: We will assure that mock -ups, lab testing, and checklists are completed prior to ordering and installing materials. We will facilitate a punch -list for each trade immediately following the installation of work at each phase of the project. When work is not performed up to the expected standards, we will assign a value for the poor quality of work and hold back the monthly draw of that specific trade contractor until the work is corrected. MANAGEMENT OF,JOBSITE SAFETY & SECURITY: Our firm takes safety seriously and treats it as our number one priority. It is not just the objective on the job site, but the common goal shared by everyone who works here. In 1996, we instituted ZIP, or "Zero Injury Process" to eliminate injuries and down time, as well as increase productivity. As a result of ZIP, our firm has one of the lowest injury rates in the country. Our lost time incidents are half the national average. By raising awareness among our employees and carefully managing our safety program, we have been able to reduce our workers compensation costs from $1 million a year to less than $75,000 a year. For our Clients, this means lower overhead costs in terms of insurance premiums and improved efficiency during construction. In addition, we are committed to providing a drug - free workplace for our Clients and employees. The unlawful sale, manufacture, distribution, dispensation, possession, or use of drugs and other controlled substances is absolutely prohibited in our workplaces. Violations of this policy will result in disciplinary action, up to and including termination. "We hired WEITZ to manage the fast -track construction of an addition to our existing office and manufacturing facility in Plantation, Florida. They completed the 265,000 square foot project in less than twelve months, which was several weeks ahead of schedule. More importantly, their staff made safety their number one priority. When all was said and done there were zero lost time incidents recorded. This was truly an amazing feat, considering we have nearly 40,000 employees working different shifts at the site. To say that they exceed our expectations would be an understatement. Their attention to detail and professionalism far surpassed any other contractor that we have worked with in the past." Joe Alaimo, Facilities Manager MOTOROLA, INC. Our safety program will be implemented and monitored by our full -time Regional Safety Manager, whose duties will include: • Establishing initial safety and security rules and parameters and communicating them with our field staff, Subcontractors, etc. • Ensuring that the requirements of the agreed security and safety plans are incorporated into the contract documents of our Subcontracts and Suppliers. • Coordinating Subcontractors and Suppliers efforts to comply with plans during construction, confirming that their programs are in place and being implemented. • Regulary attending the job site for spot checks and conformance by all parties. PROJECT APPROACH POST - CONSTRUCTION PHASE PUNCH -LIST: When each portion of the work is considered substantially complete, we will ask for a final punch -list from the Owner and Architect. This final list should be limited as we will continually provide Quality checks after each installation. We will prepare and distribute this final list of work items to the Subcontractors and Suppliers for correction. As stated earlier, we will withhold payments to the Subcontractors until all issues are resolved to the Owner's satisfaction. "During the construction phase of the project, I was especially impressed by the professionalism of the staff that WEITZ assigned to our project. Michael Vanderpool, Project Manager and David Swiercinsky, Superintendent deserve special recognition for their dedication and commitment. I would gladly work with WEITZ on future projects we may have." Sister Fidelis Regan LOURDES - NOREEN MCKEEN PROJECT CLOSEOUT: When the project is complete, we will assemble all guarantees, warranties, and as- built drawings from the trade contractors. Final turnover will include specific training for your employees in the operation and maintenance of selected building systems. START UP: Under the direction of the Owner's maintenance personnel, we will coordinate the checkout of utilities, operating equipment, and systems for readiness. We will assist with the initial start-up and testing by the trade contractors. We will develop a program to monitor the Owner's maintenance personnel on the operation and maintenance of equipment and systems incorporated on the project. FINAL PAYMENT: We will submit Subcontractor and Supplier lien waivers with our final pay request. Our books and accounting records will be available to your auditors for verification of our total construction cost. We will maintain contact with your Facility Engineer on a regular basis throughout the warranty period regarding any problems or comments they may have. MINORITY/WOMEN OWNED BUSINESS PLAN The Weitz Company will take all necessary and reasonable steps to ensure that eligible Minority and Women Business Enterprises (MWBE) have the maximum opportunity to compete for, and perform contracts on the proposed City Hall project for the City of Sunny Isles Beach. Our firm will not discriminate on the basis of race, color, national origin, or sex. In order to optimize MWBE participation for this project, the portions of the work solicited for bids will be broken down into units which correspond to the listed trades in the various MWBE directories, including Broward, Dade, and Palm Beach Counties as well as the State of Florida Department of Management Services. (i.e., mechanical trades will be divided into plumbing, air conditioning and fire protection, and the concrete shell package will be divided into formwork, rebar installation and concrete placement.) The Weitz Company seeks to meet established MWBE participation by taking positive result- oriented actions. Our proactive approach to meeting predetermined goals will include, but not be limited, to the following items: 1. Designation of a responsible person or company official to serve as the MWBE liaison with sufficient staff and authority to coordinate MWBE efforts. 2. Utilization of state and locally approved MWBE directories to identify appropriate subcontractors in Broward, Dade, and Palm Beach Counties.. 3. Advertisement by legal notices in local newspapers for MWBE invitation to bid. 4. Utilization of our own MWBE subcontractor and supplier database listing. 5. Contacting MWBE organizations that may be helpful in locating eligible MWBE firms (i.e. Minority Contractor's Association, National Association of Women in Construction, Office of Employment and Small Business Development, Minority Business Development Center). 6. Notifying MWBE firms at least three weeks prior to bid submittals. This notification will be in the form of a letter, fax, or phone call and will include the following information: Project size and description, availability of plans and specifications for review or purchase, requirements for bonding, contact person, etc. 7. Communication with MWBE firms approximately one week prior to the specified bid date to determine intent to submit a quote and to answer any questions they may have regarding plans and specifications. 8. Maintenance of records of negotiation efforts with MWBE firms contacted for the purpose of subcontracting. 9. Provision of equal opportunities for subcontracting and purchasing agreements to MWBE firms. MINORITY/WOMEN OWNED BUSINESS PLAN To conclude, The Weitz Company has worked for the following local public agencies over the past several years and has successfully met or exceeded each of their minority business requirements: PROJECT NAME MWBE % TRADES USED South Florida Waste 15.1% Site Work, Flooring, Fencing, Management Building B -1 Plumbing, Concrete Finish, Roofin , Fire Protection Palm Tran Bus Maintenance 18.0% Earthwork, Plumbing, Paving, Facility Truck Equipment, Specialties, Flooring Meyer Amphitheatre 12.4% Masonry, Plumbing, HVAC Palm Springs Elementary 15.0% Fencing, Glazing, Irrigation, School Electrical North County Regional Library 28.6% Paving, Masonry, Earthwork, HVAC, Plumbing Forest Hill High School Media 20.9% Paving, Fencing, Plumbing, Center Electrical Solid Waste Authority Sludge 14.0% Paving, Landscaping, Concrete Compost Facility Finish, Flooring Okeechobee Boulevard Library 16.6% Earthwork, Glazing, Concrete Finish, Flooring Kravis Center Parking Garage 13.9% Earthwork, Concrete Finish, Fencin , Waterproofing In every instance, the actual MWBE participation exceeded the established goals for each project. A Wells Fargo Company January 14 2002 Mr. Christopher Russo City of Sunny Isles Beach 17070 Collins Ave. Sunny Isles Beach, fl, 33160 RE: Project -New City Hall Dear Mr. Christopher: The Weitz Company is a highly regarded and valued client of American Home Assurance Company and Federal Insurance Company. We have had the privilege of providing their bonds for many years. Their financial strength and management capabilities have qualified them to bond any project they have chosen to undertake. We have executed bonds on individual projects in excess of $70,000,000, with total line of $700,000,000. We have surety credit established with American Home Assurance Company of New York, NY, which is Best rated A ++ (Superior) FSC XV and Federal Insurance Company of Warren, NJ which is Best rated A ++ (Superior)FSC XV and are listed in the Federal Register. We understand the captioned project is in the $10,000,000 range. We would anticipate no problems providing a 100% Performance and Payment Bond should The Weitz Company be awarded the project. Naturally the execution of any final bonds would be subject to review of the contract terms and conditions by our client and ourselves, as well as normal underwriting procedures at the time the bond is required. The Weitz Company has an excellent reputation in the construction industry. We have never had any complaints from owners or architects in regard to their work. If you need any further information concerning this fine contractor, please do not hesitate to contact me. Very truly yours, � Yam7 Malcolm ell FL Resident Licensed Agent MM/npl Aeordia 501 South Flagler Drive Suite 600 West Palm Beach, FL 33401 Voice: 561.655.5500 Fax: 561.655.5509 wi w.acordia.coin A Member of the PF global Network. CLIENT REFERENCES MR. BRIAN HURLEY CITY OF PORT ST. LUCIE 121 S.W. PORT ST. LUCIE BOULEVARD PORT ST. LUCIE, FLORIDA 34984 (312)750 -1234 MR. JOHN HOOVER CLASSIC RESIDENCE BY HYATT 200 WEST MADISON, SUITE 3700 CHICAGO, ILLINOIS 60606 (312)750 -8297 SISTER DIANE AND SISTER FIDELIS LOURDES- NOREEN MCKEEN RESIDENCE' 315 SOUTH FLAGLER DRIVE WEST PALM BEACH, FLORIDA 33401 (561)655 -8544 MR. PAUL LEONE THE BREAKERS OF PALM BEACH ONE SOUTH COUNTY ROAD PALM BEACH, FLORIDA 33480 (561)659 -8493 MR. KEN KARMERIS A.C.T.S., INC. 6125 NORTH VERDE TRAIL BOCA RATON, FLORIDA 33433 (561)770 -1963 MR. GEORGE MOURIZ MOURIZ SALAZAR ARCHITEC'T'S 7695 S.W. 104TH STREET MIAMI, FLORIDA 33156 (305)273 -9911 MR. JERRY BABICZ MOTOROLA, INC. 8000 W. SUNRISE BLVD. PLANTATION, FLORIDA 33322 (954)723 -5474 MR. MARTY WHITE MARRIOTT INTERNATIONAL, INC. ONE MARRIOTT DRIVE, DEPT. 102.02 WASHINGTON, D.C. 20058 (301)380 -2656 MS. BEVERLY SEARS COMMUNITY FOUNDATION OF PALM BEACH 324 DATURA STREET, SUITE 340 WEST PALM BEACH, FLORIDA 33401 (561)659 -6800 MR. CLIFF BRANDT NEIMAN MARCUS 1201 ELM STREET DALLAS, TEXAS 75270 (214)761 -2412 MR. JOHN MILBOURNE FLORIDA INSTITUTE OF TECHNOLOGY 150 WEST UNIVERSITY BLVD. MELBOURNE, FLORIDA 32901 (321) 674 -8131 MR. PAUL TWITTY STH ARCHITECTURAL GROUP 515 NORTH FLAGLER DRIVE, SUITE 1400 WEST PALM BEACH, FLORIDA 33401 (561)832 -5599 CLIENT REFERENCES MS. YOUNG SONG SONG & ASSOCIATES, INC. 400 AUSTRALIAN AVENUE SOUTH WEST PALM BEACH, FLORIDA 33401 (561)655 -2423 MR. PAUL NEFF PEACOCK & LEWIS ARCHITECTS 2705 PARK STREET LAKE WORTH, FLORIDA (561)582 -2705 MR. MIKE NELSON ZEIDLER ROBERTS PARTNERSHIP 105 S. NARCISSUS, SUITE 310 WEST PALM BEACH, FLORIDA 33401 (561)832 -9110 MR. JIM HOWELL DOW, HOWELL & GILMORE 491 NORTHPOINTE PARKWAY WEST PALM BEACH, FLORIDA 33407 (561)478 -1776 MR. BILL MIGNOGNA O'DONNELL, NACARATO & MIGNONGNA 321 15.' STREET, SUITE 200 WEST PALM BEACH, FLORIDA 33401 (561)835 -9994 CURRENT PROJECTS - FLORIDA PROJECT OWNER ARCHITECT PROJECT PROJECT SIZE ESTIMATED COST COMPLETION First Baptist Church First Baptist Church The Maddox Group $3,600,000 28,580 SF 11/02 of Boynton Beach of Boynton Beach Mr. Paul Worrell 2 Story Congregation Hall Pastor Dave Edwards 941- 955 -7358 Boynton Beach, Florida 561- 732 -5151 Safeguard Self- Storage Safeguard Self- Storage Kenneth Carlson $2,875,000 84,000 SF 09/02 Coconut Creek, Florida Mr. Mark Salvetti Architects 3 Story 504- 838 -8000 Mr. Ken Carlson 561- 368 -7798 Safeguard Self- Storage Safeguard Self- Storage Kenneth Carlson $2,875,000 84,000 SF 08/02 Miramar, Florida Mr. Mark Salvetti Architects 3 Story 504- 838 -8000 Mr. Ken Carlson 561- 368 -7798 Jupiter Community Center Town of Jupiter PBS &J $10,237,000 69,484 SF 08/02 Jupiter, Florida Mr. Bernie Schatmer Mr. Avinash Gupta 2 Story 561- 741 -2281 305 -592 -7275 Classrooms Gymnasium Offices Norton Museum of Art Norton Museum of Art Centerbrook Architects & $13,000,000 45,957 SF 07/02 South Addition & Chiller Ms. Jane Pangborn Planners, LLC 3 Story West Palm Beach, Florida 561- 832 -5196 Mr. Chad Floyd Campbell - Branch Inc. 860 - 767 -8719 Mr. Calvin Campbell 561 -833 -1180 11' Lugano CSC Palm Beach Limited The Lawrence Group $17,000,000 82,526 SF 03/02 Luxury Condominium Partnership Mr. Eugene Lawrence 6 Story Palm Beach, Florida Mr. Adam Schlessinger 561- 655 -0670 15 units 561- 835 -4003 Courtyard by Marriott CNL Realty and Development Law /Kingdon Architects $8,919,254 100,305 SF 02/02 Weston, Florida Corporation Mr. Howie Beauchamp 6 Story Mr. Brian Mashburn 316- 268 -0230 174 Rooms 407 - 650 -1774 Wellington Christian School Wellington Christian School Kuoppala & Associates $3,862,879 51,000 SF 01/02 High School Expansion Mr. Doug McLaughlin Mr. Robert Kuoppala 2 Story Wellington, Florida 561- 793 -1017 561- 439 -6424 Classrooms Administrative Offices Art & Music Rooms Locker Rooms Conference Room Lounge Area Comprehensive Alcoholism Comprehensive Alcoholism Richard Wensing $3,100,000 27,300 SF 01/02 Rehabilitations Programs IV Rehabilitations Programs, Inc. Architects 2 Story West Palm Beach, Florida Mr. Ed Adams Mr. Richard Wensing 561 - 844 -6400 561- 684 -1988 Northbridge Atrium Gaedeke Landers Schwab, Twitty & Hanser $5,921,560 3,300 SF 01/02 Renovation Mr. D.W. Landers Architects 3 Story West Palm Beach, Florida 214- 273 -3335 Mr. John Mezzetta 561- 832 -5597 TABLE OF CONTENTS SECTION 1: CORPORATE INFORMATION • COMPANY HISTORY • COMPANY QUALIFICATIONS • DIVISION ORGANIZATION CHART SECTION 2: BUDGET PROPOSAL • ESTIMATE SUMMARY • DETAIL ESTIMATE BY DIVISION • PROPOSAL QUALIFICATIONS SECTION 3: PRELIMINARY SCHEDULE SECTION 4: PRELIMINARY SITE LOGISTICS PLAN SECTION 5: CURRENT PROJECTS - FLORIDA DIVISION SECTION 6: PROJECT EXPERIENCE SAMPLING COMPLETED PROJECTS - FLORIDA (PAST 5 YEARS) PROJECT OWNER ARCHITECT PROJECT PROJECT COMPLETIOP COST SIZE DATE The Breakers Hotel The Breakers Palm Beach, Inc. Peacock + Lewis Architects & Planners, $7,461,428 56,000 SF 11/01 South Tower Renovation Mr. Paul Leone Inc. 6 Story Palm Beach, Florida 561- 659 -8493 Paul Neff 69 Rooms 561 -582 -2705 Sandhill Cove Phase III Sandhill Cove Properties, Inc. Aldrian Guszkowski, Inc. $5,489,908 48,986 SF 09/01 Palm City, Florida Mr. Kent Larson Ms. Tracey Schnick 515- 245 -7654 262- 789 -6060 Courtyard by Marriott Concord Hospitality Enterprises Braun & Steidl Architects $5,081,172 61,915 SF 08/01 West Palm Beach, Florida Mr. Timothy Osiecki Mr. Jim Gilbert 4 Story 440- 701 -1000 330 -864 -7755 103 Rooms Community Foundation Community Foundation for Palm Portuondo — Perotti $4,981,913 33,514 SF 07/01 Office Building Beach & Martin Counties, Inc. Mr. Rafael Portuondo 2 Story West Palm Beach, Florida Mr. Beverly Sears 305 - 442 -1262 561- 659 -6800 Bethesda Memorial Florida Power & Light Company G.R.G. Vanderweil Engineers, Inc. $142,206 1,350 SF 07/01 HVAC Upgrades Mr. Robert Palahunik Mr. Tim Pennock Boynton Beach, Florida 561 -691 -2554 407 -660 -0088 The Breakers Hotel The Breakers Palm Beach, Inc. Peacock + Lewis Architects & Planners, $313,564 Various 6/01 2001 Renovations Mr. Paul Leone Inc. Renovations Palm Beach, Florida 561 -659 -8493 Paul Neff 561 -582 -2705 Flagler Museum Henry Morris Flagler Museum Brower & Associates $2,999,000 20,000 SF 05/01 Mechanical Upgrades & Mr. John Blades Mr. Ken Brower Miscellaneous Renovations 561- 655 -2833 561 -659 -1948 Palm Beach, Florida Quantum Village St Mary's Hospital Peacock & Lewis Architects & Planners, $1,277,078 8,700 SF 05/01 West Palm Beach, Florida Mr. Rick Tobias Inc. 561- 882 -6313 Mr. Craig Stone 561 -582 -2705 Fairfield Inn & Suites PalmLor LLC George White & Associates $1,500,000 43,260 SF 05/01 Conversion of an existing Mr. Al Barenklau Mr. John Vaughn 3 Story Howard Johnson's Hotel 407 - 833 -0368 561- 997 -6698 98 Rooms Palm Beach, Florida Charles & Ruth Clemente Florida Institute of Technology, Inc. Schwab, Twitty & Hanser Architects $6,612,728 58,893 SF 05101 Center for Sports & Mr. John Melbourne Mr. Paul Twitty 3 Story Recreation 321 - 674 -8131 561- 832 -5599 Melbourne, Florida Jewish Association for Jewish Federation of South Palm Dwight Sarver AIA/ASID, Inc. $3,987,228 45,010 SF 05101 Residential Care Living & Beach County Mr. Dwight Sarver 2 Story Learning Center Mr. Brett Burstell 561- 395 -6867 2 Buildings Boca Raton, Florida 561- 852 -3289 Greenwell Properties Advanced Painting Contractors, Inc. Alan Strassler $440,463 14,241 SF 05/01 Warehouse Mr. Eric Green Architects, Inc. West Palm Beach, Florida 561- 845 -0123 Mr. Alan Strassler 561- 627 -0332 Indian River Estates ACTS — Retirement Life TH W Design $10,288,473 129,572 SF 05/01 Assisted Living Facility Communities, Inc. 404- 252 -8040 3 Story Vero Beach, Florida Mr. Ken Karmeris 71 Assisted 561- 770 -1936 Living Adolph & Rose Levis Jewish Federation of South Palm Schwab, Twitty & Hanser Architects $2,685,287 22,350 SF 05/01 Adult Day Care Center Beach County Mr. Paul Twitty Boca Raton, Florida Mr. Brett Burstell 561- 832 -5599 561- 852 -3289 COMPLETED PROJECTS - FLORIDA (PAST 5 YEARS) PROJECT OWNER ARCHITECT PROJECT PROJECT COMPLETIOP COST SIZE DATE Palm Beach Day School Palm Beach Day School Fanning Howey Associates of Florida $2,000,000 18,669 SF 05/01 Gymatorium & Mr. Martin List Mr. Scott Watson Miscellaneous Renovations 561 -655 -1188 561 -697 -3660 Palm Beach, Florida The Breakers Hotel The Breakers Hotel of Palm Beach Peacock + Lewis Architects & Planners $7,163,398 37,746 SF 02/01 Golf & Tennis Club Mr. Paul Leone Mr. Paul Neff 3 Story Palm Beach, Florida 561- 655 -6611 561 -582 -2705 Palm Beach Country Club Palm Beach Country Club Peacock + Lewis Architects & Planners $7,350,884 60,000 SF 02/01 Renovation Mr. Roberto Milanesi Mr. Paul Neff 2 Story Palm Beach, Florida 561 -844 -3501 561 -582 -2705 The Breakers Hotel — 2000 The Breakers Palm Beach, Inc. Peacock + Lewis Architects & Planners $2,815,627 Various 12/00 Renovations Mr. Paul Leone Mr. Paul Neff Renovations Palm Beach, Florida 561- 659 -8493 561 -582 -2705 Neiman Marcus 151 Worth Avenue Partnership, Exterior Shell - The Lawrence Group $12,897,844 144,400 SF 10 /00 New Store & Parking Garage LTD Mr. Gene Lawrence 5 Story Palm Beach, Florida c/o The Goodman Company 561 -655 -0670 Mr. Don Jones Interiors — Diedrich NBA 561- 833 -3777 Mr. Richard Diedrich 404 -364 -9633 Fairfield Inn & Suites Boca Airport Hotel Partners George F. White AIA & Associates $4,468,556. 54,000 SF 09/00 @ Boca Airport Mr. Mike Harrell Mr. George White 4 Story Boca Raton, Florida 713- 267 -5800 561- 997 -6698 First Baptist Church First Baptist Church Schwab, Twitty & Hanser Architects $4,900,056 47,740 SF 09/00 Family Life & Recreation Mr. Ken Winter Mr. Paul Twitty 4 Story Center 561 -650 -7400 561- 832 -5599 West Palm Beach, Florida Bentley Village Retirement Classic Residence by Hyatt HHCP Architects $45,669,874 598,306 SF 08/00 Community Mr. John Hoover Mr. John Anderson 22 Naples, Florida 312- 750 -8123 407 -644 -2656 Buildin s Lakeside Village Retirement Classic Residence by Hyatt Mouriz — Salazar $5,988,598 83,173 SF 08/00 Community Mr. John Hoover Mr. Ed Llorca 3 Story Lantana, Florida 312- 750 -8123 305- 273 -9911 NHC Dementia Facility National Health Care Corporation Johnson & Bailey Architects $2,210,500 20,341 SF 07/00 Vero Beach, Florida Mr. Tom Campbell 615- 890 -4560 Fairfield Inn & Suites CMH Jupiter, LLC TEAM Architecture, Inc. $3,800,000 54,000 SF 04/00 Jupiter, Florida Mr. John Metz 561- 835 -0032 4 Story 561- 684 -2101 Congregation B'nai Torah Congregation B'nai Torah Stanford G. Brooks AIA $1,470,000 15,170 SF 03/00 Addition Mr. Mark Gilbert Mr. Stanford Brooks Boca Raton, Florida 561 - 392 -8566 561 -367 -6042 The Breakers Hotel The Breakers Palm Beach Inc. Peacock & Lewis Architects $1,300,000 15,000 SF 03/00 1999 Rooms Renovations Mr. Paul Leone Mr. Paul Neff Palm Beach, Florida 561- 655 -6611 561 -582 -2705 Sandhill Cove Retirement Life Care Services Aldrian Guszkowski $5,900,000 40,000 SF 02/00 Community — Phase 11 Mr. Kent Larsen Ms. Tracey Schnick Addition 515- 245 -7654 262 - 789 -6060 Stuart, Florida Homewood Residence Strategic Investments, Inc. Earl Swensson Associates $6,356,900 60,560 SF 11/99 Assisted Living Facility Mr. Les Matthews Mr. Chris Perryman Coconut Creek, Florida 770 351 -0022 615- 329 -9445 QVC Call Center QVC St. Lucie, Inc. Schwab, Twitty & Hanser Architects $5,580,000 53,232 SF 10/99 Port St. Lucie, Florida Mr. David Krupitzer Mr. Paul Twitty 610 -701 -1406 1 561- 832 -5599 COMPLETED PROJECTS - FLORIDA (PAST 5 YEARS) PROJECT OWNER ARCHITECT PROJECT PROJECT COMPLETIOD COST SIZE DATE Fairfield Inn & Suites & B.F. Saul Real Estate Investment George F. White & Associates $12,000,000 138,270 SF 08/99 TownePlace Suites Trust Mr. George White Boca Raton, Florida Mr. Enio Guerra 561-997-6698 770 - 952 -0075 Florida Physicians Medical Titan Development Company Farmer Baker Barrios $1,470,428 22,060 SF 08/99 Center @ Waterford Lakes Mr. Jim Boures Mr. Tim Baker Orlando, Florida 312- 944- 4619 407- 875 -0012 TownePlace Suites Hotel B.F. Saul Real Estate Investment George F. White & Associates $4,175,000 55,300 SF 07/99 Ft. Lauderdale, Florida Trust Mr. George White Mr. Enio Guerra 561- 997 -6698 770- 952 -0075 New City Hall City of Port St. Lucie Schwab, Twitty & Hanser Architects $7,300,000 65,000 SF 06199 Port St. Lucie, Florida Mr. Brian Hurley Mr. Paul Twitty 561 - 871 -5135 561- 832 -5599 Walgreens Pharmacy Linton Jog Associates, Ltd. Mark Weiner, AIA $1,630,000 15,859 SF 06/99 @ Addison Center Mr. John Hoecker Mr. Mark Weiner Delray Beach, Florida 561 -586 -8353 561- 750 -4111 The Breakers Hotel The Breakers Palm Beach, Inc. Peacock + Lewis Architects & Planners $12,000,000 75,000 SF 03/99 New Ballroom & Beach Club Mr. Alex Gilmurray Mr. Paul Neff Palm Beach, Florida 561- 655 -6611 561 -582 -2705 Whispering Pines City of Port St. Lucie Schwab, Twitty & Hanser Architects $760,000 10,600 SF 03/99 Gymnasium Mr. Brian Hurley Mr. Paul Twitty Port St. Lucie, Florida 561 -586 -8353 561 -832 -5599 VersaChem Warehouse Gaeta Development Alan Strassler Architects $2,500,000 70,000 SF 01/99 Riviera Beach, Florida Mr. Lou Gaeta Mr. Alan Strassler 561 - 627 -1200 561- 627 -0336 La Quinta Inn & Suites La Quinta Inns, Inc. Lindsay, Ponder, Brayfield & Associates $6,714,642 105,000 SF 12/98 Orlando, Florida Mr. Murray Cathlina 770 -963 -8989 7 Story 210- 302 -6386 184 Rooms Jewish Federal HUD SPBC Federation Housing, Inc. SLA Architects & Planners $5,000,000 81,941 SF 11/98 Housing Ms. Helene Eichler Mr. Joe Legan Boca Raton, Florida 561- 852 -3222 561 -626 -6599 Stratford Court by Marriott Marriott Senior Living Services Architectural Concepts, Inc. $7,000,000 79,350 SF 11/98 Boca Raton, Florida Mr. Marty White Mr. John Frey 301 - 380 -2656 813 -584 -7178 Breakers Row Air The Breakers Palm Beach, Inc. Coburn & Associates $2,500,000 100,000 SF 08/98 Conditioning - Ph. 11 561- 655 -6611 Mr. Dick Coburn Palm Beach, Florida 561 -694 -0770 Florida Physicians Medical Titan Development Company Farmer Baker Barrios Architects, Inc. $1,200,000 17,230 SF 08/98 Center @ MetroWest Mr. Jim Boures Mr. Tim Baker Orlando, Florida 312- 944 -4619 407 - 875 -0012 Motorola Office & Motorola, Inc. Schwab, Twitty & Hanser Architects $21,000,000 268,500 SF 07/98 Manufacturing Plant Mr. Joe Alaimo Mr. Paul Twitty Expansion 954- 723 -5474 561 - 832 -5599 Plantation, Florida North Material Recovery FCR, Florida, Inc. Alan Strassler Architects $1,200,000 27,550 SF 07/98 Facility Mr. Dick White Mr. Alan Strassler West Palm Beach, Florida 412- 963 -0526 521 -627 -0336 The Breakers Hotel The Breakers Palm Beach, Inc. Peacock + Lewis Architects & Planners $1,000,000 N/A 07/98 Site Utilities Relocation 561- 655 -6611 Mr. Paul Neff Palm Beach, Florida 1 561 -582 -2705 Hofer -Darr Atlantic Panel Products, Inc. Jorge L. Perez, AIA $1.265,000 42,000 SF 04/98 Office & Warehouse 561- 265 -3635 Mr. Jorge Perez Delray Beach, Florida 561- 775 -3611 COMPLETED PROJECTS - FLORIDA (PAST 5 YEARS) PROJECT OWNER ARCHITECT PROJECT PROJECT COMPLETIOP COST SIZE DATE Hanley Hazelden Center Hanley Hazelden at St. Mary's, Inc. Richard Wensing $1,190,000 20,000 SF 04/98 West Palm Beach, Florida Ms. Martha Silliman, CPA Architects & Planners 561- 848 -1666 Mr. Richard Wensing 561- 684 -1990 ManorCare Skilled Nursing ManorCare, Inc. Architectural Concepts, Inc. $4,256,762 74,650 SF 04/98 Facility Ms. Marjorie Swick Mr. Ken Eilers Delray Beach, Florida 301- 979 -3000 813 -584 -7178 Palm Beach Atlantic College Palm Beach Atlantic College Schwab, Twitty & Hanser Architects $5,500,000 61,000 SF 04/98 Sports Complex Michael Allen Mr. Paul Twitty West Palm Beach, Florida 561 -803 -2160 561- 832 -5599 McKeen Towers - Phase 11 LNM Residence for Geriatric Care O'Keefe Architects $20,000,000 245,200 SF 02/98 West Palm Beach, Florida Sister Fidelis Mr. Dennis O'Keefe 561- 655 -8544 813 -531 -5885 Residence Inn by Marriott Hotel Investors of West Palm Beach Borroto & Reus, P.A. $3,600,000 56,850 SF 02/98 West Palm Beach, Florida Mr. Dick Vilardo Ms. Beatriz Loynaz 301 - 340 -6324 305 -592 -7540 Airoso Community Center City of Port St. Lucie Schwab, Twitty & Hanser Architects $2,978,647 27,000 SF 01/98 Port St. Lucie, Florida Mr. Brian Hurley Mr. Paul Twitty 561-871-5135 561 -832 -5599 Arden Courts ManorCare of Boynton Beach Architectural Concepts, Inc. $2,006,694 25,000 SF 01/98 Delray Beach, Florida Ms. Marjorie Swick Mr. Ken Eilers 301 - 979 -3000 813 -584 -7178 Cool Care, Inc. Cool Care, Inc. Alan Strassler Architects $1,206,000 25,000 SF 01/98 Boynton Beach, Florida Mr. Michael Bianco Mr. Alan Strassler 954- 698 -0067 561 -627 -0336 Brighton Gardens by Marriott Senior Living Services Architectural Concepts, Inc. $6,000,000 70,280 SF 12/97 Marriott Mr. Marty White Mr. Emmett Walsh Boca Raton, Florida 301- 380 -2656 813 -584 -7178 Rosarian Academy Rosarian Academy Schwab, Twitty & Hanser Architects $2,500,000 32,000 SF 12/97 West Palm Beach, Florida Mr. Edward King Mr. Paul Twitty 561 - 832 -5131 561 - 832 -5599 Villa Madonna, Inc. Catholic Diocese Ted Hoffman Architects $5,125,053 81,489 SF 12/97 Lake Worth, Florida Mr. Robin Tolar Mr. Ted Hoffman 561- 775 -9571 305- 442 -4608 Breakers West Maintenance Breakers West Development Raymond Berry Architects $504,614 8,570 SF 11/97 Facility Corporation Mr. Raymond Berry Palm Beach, Florida Mr. Jerry Wygant 561 -881 -1583 561 -659 -8444 United Parcel Service United Parcel Service Stone & Webster Engineering Corp. $3,805,107 71,985 SF 11/97 Package Distribution Facility Mr. Jim Eatherton Mr. Ron Pate Tampa, Florida 770 - 417 -2071 770 - 481 -4100 Boca Raton Municipal Boca Raton Purchasing Dept. Slattery & Root $8,097,500 80,000 SF 08/97 Complex Mr. Bob DeChristoper Mr. Phillip Luchner Boca Raton, Florida 561- 393 -7872 561- 392 -3720 Baxter Charities Building The C. Kenneth & Laura Baxter Peacock + Lewis Architects & Planners $3,000,000 24,990 SF 07/97 West Palm Beach, Florida Foundation Mr. Paul Neff Mr. Dave Donten 561 -582 -2705 561 - 627 -9687 C.A.R.P. III Comprehensive Alcoholism Richard Wensing Architects $1,300,000 23,021 SF 07/97 West Palm Beach, Florida Rehabilitation Programs, Inc. Mr. Richard Wensing Mr. Robert Bozzone 561- 684 -1988 561 - 844 -6400 The Benjamin School The Benjamin School Jones & Song $1,250,000 16,800 SF 07/97 Phase 2A Addition Rob Owen Mr. Bob Thomas North Palm Beach, Florida 561 -626 -3747 561- 863 -2200 COMPLETED PROJECTS - FLORIDA (PAST 5 YEARS) PROJECT OWNER ARCHITECT PROJECT PROJECT COMPLETIOP COST SIZE DATE Florida Power & Light Florida Power & Light Alan Strassler Architects $2,242,644 19,100 SF 12/96 Office Building Mr. Kevin Hughes Mr. Alan Strassler West Palm Beach, Florida 561- 625 -7119 561 -627 -0336 Kidstown Learning Center Kidstown Laming Center, Inc. Peacock + Lewis Architects & Planners $600,000 8,583 SF 12/96 West Palm Beach, Florida Mr. Paula Poupore Mr. Paul Neff 561 -965 -9393 561 -582 -2705 The Breakers Hotel The Breakers of Palm Beach Peacock + Lewis Architects & Planners $3,500,000 6,575 SF 11/96 1996 Renovation Program Mr. Jerry Wygant Mr. Paul Neff Palm Beach, Florida 561- 655 -6611 561 -582 -2705 The Breakers Hotel The Breakers of Palm Beach Peacock + Lewis Architects & Planners $1,400,000 N/A 11/96 Retail Shops Mr. Jerry Wygant Mr. Paul Neff Palm Beach, Florida 561- 655 -6611 561 -582 -2705 The Breakers Hotel The Breakers Hotel, Inc. Peacock + Lewis Architects & Planners $2,000,000 N/A 11/96 Palm Beach, Florida Mr. Jerry Wygant Mr. Paul Neff 561 - 655 -6611 561 -582 -2705 System 3 Membrane Poole & Kent Montgomery Watson Americas, Inc. $2,300,000 30,000 SF 11/96 Softening Facility Mr. Greg Lewis Mr. Jeff Glover West Palm Beach, Florida 305- 325 -1930 561 -586 -8830 John's Island Beach Club John's Island Beach Club Robert Reid Architects, Inc. $700,000 18,000 SF 10/96 Vero Beach, Florida Mr. Mike McCormick Mr. Robert Reid 561 -231 -1700 561- 231 -4314 United Parcel Service United Parcel Service Richard Wensing AIA $312,798 3,160 SF 09/96 Office Renovation Mr. Mark Dixon Mr. Richard Wensing Orlando, Florida 770- 417 -2079 561- 684 -1988 Palm Beach Bedding Palm Beach Bedding Alan Strassler Architects, Inc. $6,000,000 235,000 SF 08/96 West Palm Beach, Florida Mr. Mike Bubis Mr. Alan Strassler 561- 833 -8491 561 -627 -0336 The Benjamin School The Benjamin School Jones & Song $1,314,197 26,180 SF 08/96 North Palm Beach, Florida Mr. Rob Owen Mr. Bob Thomas 561- 626 -3747 561- 863 -2200 Palm Springs Elementary School Board of Palm Beach County Fanning Howey Associates $1,546,500 11,135 SF 07/96 School Mr. Brian Harker Ms. Renee Tursea Palm Springs, Florida 561 - 434 -8496 561 -697 -3660 United Parcel Service United Parcel Service Stone & Webster Engineering $3,000,000 100,000 SF 07/96 Customer Service Center Mr. Mark Dixon Mr. Ron Pate Tampa, Florida 770 -417 -2079 404- 481 -4100 Florida Nature & Culture Soka Gakai International USA Schwab, Twitty & Hanser Architects $25,000,000 175,000 SF 06/96 Center Mr. George Odano Mr. Paul Twitty Ft. Lauderdale, Florida 310- 451 -8811 561- 832 -5599 Lakes of Laguna Pelcorp Michael B. Schorah & Associates, Inc. $1,191,764 1,500 SF 06/96 West Palm Beach, Florida Mr. Prescott Lester Mr. Mike Schorah 561- 835 -8118 561 - 968 -0080 McKeen Towers LNM Residence for Geriatric Care O'Keefe Architects $1,107,422 10,000 SF 06/96 Parking Garage Phase 1 Sister Fidelis Mr. Eric Krull West Palm Beach, Florida 561- 655 -8544 813- 781 -5885 Bandshell at Meyer's City of West Palm Beach Zeidler- Roberts Partnership $845,169 7,515 SF 05/96 Amphitheater Mr. Richard Pittman Mr. Mike Nelson West Palm Beach, Florida 561- 659 -8000 561- 832 -9110 Fidelity Federal Savings Fidelity Federal Savings Bank of MPA Architects, Inc. $700,000 5,400 SF 03/96 Bank Florida Mr. Rick Logan Boynton Beach, Florida Mr. Dan Turk 561 -683 -7000 561 -659 -9940 Palm Beach Ocean Studios Palm Beach Ocean Studios Oliver- Glidden $3,449,993 42,220 SF 03/96 West Palm Beach, Florida Mr. Thorpe Shuttleworth Mr. John Glidden 561 - 881 -8778 561 -684 -6841 COMPLETED PROJECTS - FLORIDA (PAST 5 YEARS) PROJECT OWNER ARCHITECT PROJECT PROJECT COMPLETIOC COST SIZE DATE Smart & Final Convenience Paul Hanna Management Ahern MacVitte Hoffman & Goodman, $650,000 20,000 SF 02/96 Store Mr. Hank Porcher Ltd. Hollywood, Florida 561 -655 -5337 Mr. Michael MacVitte 480 - 967 -7861 Temple Torah of West Temple Torah Stanford G. Brooks $1,479,774 22,000 SF 12/95 Boynton Mr. Joe Pertofsky Mr. Stan Brooks Boynton Beach, Florida 561 -369 -1112 561- 367 -6042 UPS Data Center United Parcel Service Stone & Webster Engineering $2,500,000 95,000 SF 12/95 Boynton Beach, Florida Mr. Mark Dixon Mr. Ron Pate 770 - 802 -4202 707 - 481 -4100 John's Island Clubhouse John's Island Club, Inc. Childs Bertman Tseckares, Inc. $9,261,087 85,000 SF 11/95 Vero Beach, Florida Mr. Rex Wilson Mr. Kent Duckham 561- 231 -1700 617- 262 -4355 The Breakers Hotel The Breakers of Palm Beach Gordon Mock, AIA $3,400,000 28,850 SF 11/95 Phase IV Renovation Mr. Jerry Wygant Mr. Gordon Mock Palm Beach, Florida 561- 655 -6611 561- 686 -1763 AHEPA 18 Apartments AHEPA Management Co. SLA Architectural Group $3,605,402 71,800 SF 10/95 West Palm Beach, Florida Mr. Alex Kaldyanides Mr. Joe Legan 561- 626 -6599 The Breakers Hotel The Breakers of Palm Beach Peacock + Lewis Architects & Planners $600,000 N/A 09/95 Room Renovations Mr. Jerry Wygant Mr. Paul Neff Palm Beach, Florida 561 -655 -6611 561 -582 -2705 Windsome Farms Stable & HDK Associates, Inc. J/M Ventures, Inc. $3,213,143 38,525 SF 09/95 Maintenance Facility Mr. David Kirby Ms. Janet Jarvis Wellington, Florida 708 -475 -6270 208- 344 -8008 Palm Beach Atlantic College Palm Beach Atlantic College Schwab, Twitty & Hanser Architects $3,492,276 52,400 SF 07/95 Dormitory Mr. Mike Allen Mr. Paul Twitty West Palm Beach, Florida 561- 650 -7700 561 -832 -5599 Redemptive Life Fellowship Redemptive Life Fellowship Peacock + Lewis Architects & Planners $900,000 28,700 SF 07/95 Phase 11 Mr. Harold Ray Mr. Paul Neff West Palm Beach, Florida 561- 832 -6077 561 -582 -2705 North County Regional Palm Beach County Board Educated Design $2,295,000 24,000 SF 02/95 Library of Commissioners Mr. Samuel Ferrari Palm Beach Gardens, Florida Mr. Dean Ellis 561 -697 -5151 561- 233 -0208 This Golf & Country Club Ibis Landing Venture, Ltd. Architectural Design Group $3,737,000 49,622 SF 01/95 West Palm Beach, Florida Mr. Joshua Mendelsohn Mr. Emmett Walsh 561 -686 -2000 305 -522 -1667 Redemptive Life Fellowship Redemptive Life Fellowship Peacock + Lewis Architects & Planners $9,000,000 28,700 SF 12/94 West Palm Beach, Florida Mr. Harold Ray Mr. Paul Neff 561 - 832 -6077 561 -582 -2705 The Breakers Hotel The Breakers of Palm Beach Gordon Mock, AIA $3,700,000 20,000 SF 11/94 Phase III Renovations Mr. Jerry Wygant Mr. Gordon Mock Palm Beach, Florida 561- 655 -6611 561 -686 -1763 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1 . This sworn statement is submitted to The City of Sunny Isle Beach by Gary Hennings for The Weitz Company, LLC whose business address is _560 Village Boulevard, Suite 120, West Palm Beach, FL 33409 and (if applicable) its Federal Employer Identification Number (FEIN) is 42- 0591030 (IF the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: 2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non jury trial, or entry of a plea of guilty or nolo contenders. 4. I understand that an "affiliate" as defined in Paragraph 287.133(1)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity come. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 1 -17 -02 Date Page 9 of 10 Rfq 01 -12 -02 Construction Management Srvs 1115102 6:50 PM NON - COLLUSIVE AFFIDAVIT State of Florida ) )ss County of Palm Beach _) Gary Hennin s - being first duly sworn, deposes and says that: !r (1) He /she is the (Owner, Partner, Officer, Representative or Agent) of the respondent that has submitted the attached Proposal; (2) He /she is fully informed respecting the preparation and contents of the attached Proposal and of all pertinent circumstances respecting such Proposal; (3) Such Proposal is genuine and is not a collusive or sham Proposal; (4) Neither the said respondent nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Proposer, firm, or person to submit a collusive or sham Proposal in connection with the Work for which the attached Proposal has been submitted; or to refrain from proposing in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Respondent, firm, or person to fix the price or prices in the attached Proposal or of any other Respondent, or to fix any overhead, profit, or cost elements of the Proposal price or the Proposal price of any other Respondent, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach, or any person interested in the proposed Work; (5) The price or prices quoted in the attached Proposal are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Proposer or any other of its agents, representatives, owners, employees or parties in interest, including this affiant. Sworn to and subscribed before me this 17th day of January , 2002, by _ Gard Hennings who is personally known to me or has nrovided as identification. Notary Seal: l Notary Signature - dfF1CI.�i NOTARY SEAL Commission Expires: BETH HERSHOCK Commission No.: NOTARY PUBLIC STATE OF FLORIDA COMMISSION NO. DD011984 Y COMMISSION EXP. APR. 20 2005 Page 10 of 10 Rfq 01 -12 -02 Construction Management Srvs 1115102 6:50 PM 4� FLORIDA DEPARTMENT OF STATE Katherine Harris Secretary of State January 16, 2001 CT CORPORATION SYSTEM Qualification documents for THE WEITZ COMPANY, LLC were filed on January 16, 2001, and assigned document number M01000000102. Please refer to this number whenever corresponding with this office. Your limited liability company is now qualified and authorized to transact business in Florida as of the file date. In accordance with section 608.406(2), F.S., the name of this limited liability company is filed with the Department of State for public notice only and is granted without regard to any other name recorded with the Division of Corporations. A limited liability company annual report/uniform business report will be due this office between January 1 and May 1 of the year following the calendar year of the file date. A Federal Employer Identification (FEI) number will be required before this report can be filed. If you do not already have an FEI number, please apply NOW with the Internal Revenue by calling 1- 800 -829 -3676 and requesting form SS -4. Please be aware if the limited liability company address changes, it is the responsibility of the corporation to notify this office. Should you have any questions regarding this matter, please telephone (850) 487- 6051, the Registration and Qualification Section. Trevor Brumbley Document Specialist Division of Corporations Letter Number: 00lA00002424 APPLICATION BY FOREIGN LIMITED LIABILITY COMPANY FOR AUTHORIZATION TO TRANSACT BUSINESS IN FLORIDA IN COMPLUNCE WITH SEC770N 603..503, FLORIDA STATU7RS, THE FOLLOWING IS N ZNff ID TO REGISTER A FOREIGN LLYIITEDLIAB.ILITYC0MPANYT0 TRANSICTBUSYEZ IN7NE ST11TEOFFLORID4: 1 The Weitz Company, LLC (Name of foreign limited liability company) 2 Iowa 3 42- 1512625 (Jurisdiction under the law of which foreign limited liability ( FEI number, if applicable) company is organized) 4. 12/28/2000 5 Perpetual (Date of Organization) (Duration: Year limited liability company will cease to exist or "perpetual ") 6. V1%4 ot r J , a(9(2 1 (Date fir transacted business in Florida. (See sections 608.501, 608.502, and 817.155, F.S.) 7. 400 Locust Street, Ste. 300 Des Dines, IA 50309 (Street address of principal office) 8. If limited liability company is a manager - managed company, check here 9. The usual business addresses of the managing members or managers are as follows: See attached 10. Attached is an original certificate of existence, no more than 90 days old, duly authenticated by the official having custody ofrecords in the jurisdiction tinder the law ofwhich it is organized. (A photocopy is not acceptable. If the certificate is in a foreign languagee, a tmslation of the certificate under oath of the translator must be submitted) 11. Nature of business or purposes to be conducted or promoted in Florida: General contractor and construction management. Signature of a merrr pr an auftRb -rLed representative of a member. (In accordance with section 403(3), F.S., the execution of this document constitutes an affirmation under the penalties of perjury that the facts stated herein are true.) David S. Strutt, Manager Typed or printed name of signee • STATE OF FLORIDA DEPART"MEW OF B931NESS •A.ND PROFESS110MAL REGULKTI014 • CONST IMOUSTlY'LIC ENS I NG BOARD' (904) 727-6530 7960 ARLIMI&TON EXPRESSWAY STE 300 '=L ' 32211-7 7 46 JACKS3AIVILLE" • • • • MARTLINGv LEJNARJ.W • THE WEIT7 COMPANYINC 560..VILLAGE BLVD STE#-120 • WEST PALM BEACH FL ,33409 • • • STATE OF FLORIDA r� rt v dui li_r AC,� R J T CF BUSINESS AND FrSSj AL R-SULATIOM 6/16!2090 9990-?-?51 CERTIFIED, GENERAL CONTf ,ACTO.�Z MARTLING9'!-EOMARO W • INC. • IS C ER T I F I E D under the provisions of Ch. it 39 F • •Expiration Date: AUG 3I 200,2 • • • • • DETACH HERE - - - - - - - - - - - - - - - -- *A OF • A%D P,'�,OFc-SSIONAL' ;"REGULATION 'MST 1 ll'-t TlS Y L I C E NS' f N G 3Z) 711 �wfl P177177,771 t i mw - C f, - lamed amed 616w Under the provisions ' r rVs atChapter FS. Opiration date:. AUG 31# 2 O,OZ, 4 0MARTLIM'lLyi L ED N A R, 'A THE WE I T;-7 C a M P AN Y I C 10560 VILLA GE 3LY3 T- El 17 0 - WEST ?AL 3FAZ. =L 33 _Q9 5U-S;K- GOVERNOR STATEE OF FLORIDA GEiMERAL CiDNTRACTUR C01UNTY CICCURA,71(0�,,AAL LICE 0 11-799-169.--35 WEITZ CDODANY Il< T14E I-CCATEO AT MAi TLI v LEONARO • 5,60 VILLAGE OLVC lr'120 560 VILLAGE 9L W0 I L o • im'CST PALi" 8EACH F-L .3-3409-1963 5'1i-.57 PALM FL '3134C9-19-63 HEREBY LICENSED AT ABOVE ADDRESS —OR E 7 f-'Sqjf�D 3EGjMjNjjg- H, \1 THE F;RS— DAY OF OCTOBER AND !—:-ADiN! O\9' NE 7 HIIITaETH ZDAY OP 11 1 EPTEMBI—R — '3; 13 "CC' L4 CLASSIFICATION — t — I: L 41 04 C/ r, I C, E 1369.6 Tt:TAL it3, 7.6 THIS �S NOT A BILL - DO NOT PAY PAI0. P8C 'TAX C'01-LECTCR $336,f4s6'1' CCC 49 3)2,�351 09- 14-200C qw JOHN K. CLARK, CF-- THIS LICENSE VALID ONLY WHEN RECEiPTED BY TAX COLLECTOR • TA -A COLLECTOR, PALM &E-ACH COUN7Y LICENSE MUST BE DISPLAYED CONSPICUOUSLY AT ESTABLISHMENT OR PLACE OF BUSINES • STATE OF FLORIDA CLASSIFICATION N TR A C T OR R44LNi BEACH COUNTY 00U, *WELT7 , CLIMPANY INNC TFE MARTL I ING LEGNAR10 0560. VILLAGE 8LVO lj.120 OWE-ST PAU'l 'LEACiLi FL 32-405-IS63 0 Cr-NTRIACTLk I- c ^ 0 1 c, 11 -- !I I 0 C z MIN K. CLA�,RK, CFO TAX COLLECTOR, RAL,10 BEACH COUNTY CC C U PAT 10 NA L L 1,C E t\,g S E C -03.2 LCCATECL, AT Ct,;TY 560 VILLAGF flLVO 11120 WEST FALI' EEACH FL 33AC9-19-43 ,-rzi.�, I Tr,T AL ltl 1; A THIS IS NOT A BILL - DO NOT Pltf PAID. P,`.0 TAX CCLLECTGtR $94.50 CCC 49 32850 09-1,t-1200C THIS LICENSE VALID ONI2i/ WHEN RECEIPTED BY TAX COLLECTOR L'CCENSENIUS7 BE DISPLAYED CONSPICUOUSLY AT ESTABLISHMENT OR PLACE OF BUSINES 0 ACORD- CERTIFICATE OF LIABILITY INSURANCE °05/2212000 PRODUCER Serial # Al 623 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ARTEX INSURANCE AGENCY, INC. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 12222 MERIT DRIVE, SUITE 1660 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. DALLAS, TX 75251 -0000 (972) 702 -9004 INSURED THE WEITZ COMPANY, INC 400 LOCUST STREET CAPITAL SQUARE, SUITE 300 DES MOINES, IA 50309 -0000 COVERAGES INSURERS AFFORDING COVERAGE INSURERA: AMERICAN CONTRACTORS INS. CO. INSURER B: AMERICAN RISK FUNDING INS. CO. INSURER C: USF & G INSURER D: A INSURER E: GLR0000032 NY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT VNTH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR AY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH LNS E POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING OLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS A GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY CLAIMS MADE FX] OCCUR GLR0000032 06/01/00 06101/01 EACH OCCURRENCE $ 1,000,000 FIRE DAMAGE (Any one fire) $ 100,000 MED EXP (Any one person) $ 5,000 PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: X POLICY PE LOC PRODUCTS - COMP /OPAGG $ 1,000,000 AUTOMOBILE LIAINUTY ANY AUTO ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS} NON -OWNED AUTOS e COMBINED SINGLE LIMIT (Ea accident) $ BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE (Per accident) $ GARAGE LIABILITY ANY AUTO r" 4� AUTO ONLY - EA ACCIDENT $ OTHER THAN EA ACC AUTO ONLY: AGG $ $ EXCESS LIABILITY OCCUR CLAIMS MADE DEDUCTIBLE RETENTION $ EACH OCCURRENCE $ AGGREGATE $ $ $ $ B B I C WORKERS COMPENSATION AND EMPLOYERS' LIABILITY WCD0000055 WCR0000055 DRE1571300 06/01/00 06/01/00 06/01/00 06/01101 06/01/01 06101/01 X TORY LIAM TS ER E. L. EACH ACCIDENT $ 1,000,000 E.L. DISEASE -EA EMPLOYE $ 1,000,000 E.L. DISEASE - POLICY LIMIT $ 1,000,000 OTHER I i i I DESCRIPTION OF OPERATIONS /LOCATIONSIVEHICLES /EXCLUSIONS ADDED BY ENDORSEMENT /SPECIAL PROVISIONS ( I ( CERTIFICATE HOLDER I X � ADDITIONAL INSURED; INSURER LETTER: A CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. IVE OF ARTEX INSURANCE AGENCY I MICHAEL J. O'NEILL ACORD 25 -S (7/97) Q ACORD CORPORATION 1988 /) ACORD Certificate of Insurance Issue Date: Producer: Willis Corroon Corporation of Minnesota 4000 Olson Memorial Highway, Suite 300 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Minneapolis, MN 55422 612- 302 -7100; Fax 612 - 588 -1910 Contact: Jean Woolley /Kathy Warner Insured: COMPANIES AFFORDING COVERAGE The Weitz Company, Inc. Company Letter A TIG Insurance Company /Stewart Smith Capital Square Company Letter B 400 Locust Street, Suite 300 Company Letter C Des Moines, IA 50309 Company Letter D Company Letter E Coverages THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. CO LTR Type of Insurance Policy Number Policy Effective Date Policy Expiration Date Limits General Liability General Aggregate $ Products -Comp Ops Agg. $ ❑Commercial General Liability I I I Personal & Adv. Injury $ Each Occurrence $ ❑ Claims Made ❑ Occur. I I I ❑ Owner's & Contractor's Prot I I I Fire Damage(any One Fire) $ Med. Expense (Any one Person) $ Automobile Liability* El Any Auto ❑ All Owned Autos ❑Scheduled Autos ;= Ca :,,; .' �. "� Combined Single Limit $ Bodily Injury (Per Person) $ Bodily Injury (Per Accident) $ ❑Hired Autos I I ❑ Non -Owned Autos Property Damage $ ❑ Garage Liability I I I I❑ Excess Liability Each Occurrence $ 3,000,000 Il A I El Umbrella Form I XLB 9291673 6/1/99 1 6/1/00 Aggregate $ 3,0001000 ❑ Other than Umbrella Form Statutory Limits I� Worker's Compensation Each Accident $ (l I and I I I -Disease - Policy Limit $ II I Employers' Liability I I I Disease - Each Employee $ Other DESCRIPTION OF OPERATIONS /LOCATIONSNEHICLES /SPECIAL ITEMS I I I I� CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELED BEFORE THE I EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. �I AUTHORIZED REPRESENTATIVE Q) ACORD 25 -S (7/90) weit3000 TE Jk4W0DeYY, THIS IS EVIDENCE THAT INSURANCE AS IDENTIFIED BELOW HAS BEEN ISSUED, IS IN FORCE, AND CONVEYS ALL THE RIGHTS AND PRIVILEGES AFFORDED UNDER THE POLICY. PROOUCER COMPANY Willis Corroon Corporation of Minnesota 4000 Olson Memorial Highway, Suite 300 Minneapolis, MN 55422 INSURED The Weitz Company, Inc. Capitol Square 400 Locust St., Suite 300 Des Moines, IA 50309 Continental Casualty Company / CNA LOAN NUMBER POLICY NUMBER IM 189465983 EFFECTIVE DATE r. mavi)Y") EXPIRATION n►TF 1MU)nfVYY) 6 -1 -99 6 -1 -00 THIS REPLACES PRIOR EVIDENCE DATED; �,, k1l" Project Limit Builders Risk — "All- Risk" Coverage Flood,except Zone A which is $250,000 deductible with $5,000,000 sublimit Earthquake, except California which is 5% of values, subject to min. /max. ded. with $10,000,000 sublimit Includes Property in Transit, Property at a location other than the job site DIC / Deductible Buydown is also available 90 day cancellation notice NATURE OF I"TEPE MORTGAGEE LOSS PAYFF COAT. UNTIL Y 6RUINATED IF CHEIKET) AMOUNT OF INSURANCE DEDUCTNlLE $15,000,000 $1,000 Project limits 25,000 Project limits 25,000 Project limits ADDITIONAL INSURED (OTHERI 0 2500 Ruan Center • 666 Grand Avenue Des Moines, IA 50309 • • • • Independent Auditors' Report The Managers • The Weitz Company, L.L.C.: We have audited the accompanying consolidated balance sheet of The Weitz Company, L.L.C. and subsidiary (note 1) as of December 31, 2000 and the related consolidated statements of earnings • and cash flows for the year then ended. These consolidated financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these consolidated financial statements based on our audit. We conducted our audit in accordance with auditing standards generally accepted in the United • States of America. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the • financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement . presentation. We believe that our audit provides a reasonable basis for our opinion. In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the financial position of The Weitz Company, L.L.C. and subsidiary as of December 31, 2000 and the results of their operations and their cash flows for the year then ended, in conformity with accounting principles generally accepted in the United States of America. lei 49, KPMc, LL February 23, 2001 lei 41 41 101 41 411 61 41 ,' .' KPMG LLP. KPMG LLP, a US. limited liability partnership, is = a member of KI MG International, a Swiss association Current assets: THE WEITZ COMPANY, L.L.C. AND SUBSIDIARY Consolidated Balance Sheet December 31, 2000 Assets Cash and cash equivalents $ 32,481,218 Other investments 26,920,431 Receivables due on contracts, including retained amounts of $23,955,518 and net of allowance for doubtful receivables of $547,000 (note 11) 114,301,220 Current installments of long -term receivables (note 5) 164,003 Costs and recognized earnings in excess of billings on uncompleted contracts (note 3) 2,092,303 Other assets 1,271,366 Total current assets 177,230,541 Property and equipment, net (note 4) 5,141,969 Long -term receivables, less current installments (note 5) 730,592 Other assets, net 1,712,641 Total assets $ 184,815,743 Liabilities and Member's Equity Current liabilities: Accounts payable, including retained amounts of $26,108,034 $ 95,452,251 Due to affiliate 66,942 Billings in excess of costs and recognized earnings on uncompleted contracts (note 3) 29,735,364 Accrued expenses 15,483,791 Total current liabilities 140,738,348 Deferred compensation stock plan (note 9) 1,297,974 Other liabilities 818,881 Total liabilities 142,855,203 Member's equity — 1,000 units authorized and issued (notes 8 and 14) 41,960,540 Commitments and contingent liabilities (note 12) Total liabilities and member's equity $ 184,815,743 See accompanying notes to consolidated financial statements. 118,