RE: Letter of Interest
Dear Sirs:
Thank you in advance for the opportunity to provide our qualifications for emergency
debris clearing and removal operations for the City of Sunny Isles Beach. Please find enclosed
requested documents on our company.
TAG Grinding Services, Inc. specializes in debris management services as a full time
year-round business. We have many years of experience in disaster assistance and debris
removal. Due to our extensive experience and qualified personnel, we are not only able to
handle large amounts of debris removal and disaster assistance in a timely manner, but we are
also able to assist City officials in the more technical issues that they may encounter with both
FEMA and the U. S. Army Corp of Engineers. Because we deal with debris management on a
day-to-day basis, we are certain that TAG Grinding Services, Inc. is the most qualified company.
TAG is associated with other companies that provide a full range of disaster recovery
services from emergency generators, ice and water, to temporary drying of facilities and
emergency housing. If you are interested in additional information on these services, please let
us know.
Again, thank you for the opportunity. Please feel free to contact me directly at (256)
395-2243 or on my cell at (404) 473-1266 should you have questions or need additional
information. We look forward to assisting in future disaster response situations.
Sincerely,
h/#- ~
Jerry W. Brooks, CFO
P. O. Box 25 * Davlston * Alabama * 36256 * OffIce: (256) 395-2243 * Fax: (256) 395-9269
8395 WIlliams Road * Palmetto * Georgia * 30268 * Office: (770) 969-7980 * Fax: (770) 969-7988
I
I
i TAB 1
'0
· Letter of Transmittal
· Executive Summary
o.
o
o
o
o
..,., ..,.,
...., TAG....,
GRINDING SERVICES, INC.
Letter of Transmittal
TAG Grinding Services, Inc. is a Georgia corporation licensed to transact business in the states
of Florida, Mississippi, Louisiana, Alabama, North Carolina, South Carolina, Kentucky, Virginia,
Oklahoma, Arkansas, and Texas. The corporate office is located at 8395 Williams Road,
Palmetto, Georgia, 30268. The company was founded in 1996 and incorporated in 1998. Our
hours of operation are 24 hours per day. TAG Grinding Services currently employees 43 full-
time employees.
Jerry W. Brooks, Chief Financial Officer, is authorized to bind the company to any type of
contract for disaster debris removal services.
Other contact available for information regarding this proposal:
Jeff Hill, Emergency Response Officer: (706) 718-7274
John Bowden, Procurement Officer: (678) 201-6068
TAG Grinding Services, Inc. FEIN Number: 58-2373565.
TAG Grinding Services, Inc. has been assisting clients in disaster recovery and debris removal
since inception in 1996. We are confident that our extensive experience and qualified personnel
make us more than capable of handling any disaster recovery needs.
All aforementioned personnel can be reached at (256) 395-2243.
· 3.1 Rule: TAG Grinding Services, Inc. declares that it was made without
collusion with any other person or entity.
· TAG Grinding Services, Inc. does not employ any Lobbyist for this proposal or
for the City of Sunny Isles Beach, Florida.
s~' 1(/. ~
Jerry W. Brooks, CFO
P. O. Box 25 * Davlston * Alabama * 36256 * Office: (256) 395-2243 * Fax: (256) 395-9269
8395 WIlliams Road * Palmetto * Georgia * 30268 * Office: (770) 969-7980 * Fax: (770) 969-7988
c
..,.,. ..
...., TAG....,
GRINDING SERVICES, INC.
EXECUTIVE SUMMARY
TAG Grinding Services, Inc., is a Georgia corporation authorized to transact business in
the states of Florida, Mississippi, Louisiana, Alabama, North Carolina, South Carolina, Kentucky,
Virginia, Oklahoma, Arkansas, and Texas. TAG Grinding Services, Inc. was founded in 1996 and
incorporated February 23, 1998 by Greg Rodgers, President and Vice President and Jerry W.
Brooks, Secretary and Treasurer. TAG Grinding Service, Inc.'s main line of business is debris
collection, removal, reduction, and disposal. We operate 7 grinders on a continuous basis and
process over 12,000 yards of debris per day year round in the Atlanta, Georgia area.
o
In addition to the continued management of debris facilities in Georgia, TAG Grinding
Services, Inc. responds to demolition and debris projects created from national disasters. We
have successfully completed hundreds of land clearing operations, landfill debris reduction,
storm debris removal, and reduction, plus storm recovery and restoration jobs since 1996.
While continuing reduction services in Atlanta, TAG Grinding Services, Inc. responded to the
Florida hurricanes of 2004 with five simultaneous disaster response operations. These
operations ranged from removing debris from 450 miles of canals in Cape Coral, Florida to
clearing 2,000 miles of roads throughout Florida, to removing debris at the curbside at storm
damaged locations.
All operations were personally started by Jerry W. Brooks and completed successfully.
Unlike some contractors, TAG has fully paid all sub-contractors and suppliers, even though we
are still owed money.
TAG Grinding Services, Inc. owns over 200 pieces of debris removal and disposal
equipment (see attached list) plus self-supportive campers and trailers to provide facilities,
accommodations, and meals, enabling their storm response crews to respond before the wind
and rain is over. In addition, TAG has a strong relationship with 20+ debris collection / removal
sub-contractors, as well as equipment rental companies. We call upon these subcontractors
and equipment companies whenever there is a need for additional assistance in responding to a
natural disaster. The majority of these sub-contractors can respond anywhere in the southeast
within 24 hours. They are trained and experienced in disaster response and are familiar with
living conditions, environmental concerns and safety requirements at disaster sites.
In addition to debris management and disposal services, TAG Grinding Services, Inc. is
associated with other companies that provide a full range of disaster recovery services.
Through these affiliations, we are able to offer services such as emergency generators, ice and
water, temporary dry-in services, emergency housing, and other services. Please contact us for
specific information on services you require.
o
Unlike many other disaster relief contractors, TAG Grinding Services, Inc. is a full-time
debris management contractor. We do not perform grading or general construction or just
broker disaster recovery work. Every day, TAG handles debris for the City of Atlanta, Georgia;
Cobb County, Georgia; Fulton County, Georgia; Carrollton, County Georgia; Monroe County,
Georgia; Covington, Georgia; Peachtree City, Georgia; Lagrange, Georgia; Gadsden, Alabama;
and Sylacauga, Alabama. TAG operates a 20+-acre debris management reduction site 24 hours
o
o
o
per day year round serving a combined population of over 5,000,000 and averaging over
12,000 yards of debris daily. In addition, all of the equipment we own is geared towards debris
management operations. We may not be the least expensive but you will find that we are your
best value in any debris collection, disposal, and management operation.
o
o
o
TAB 2
. Organizational Chart
. Experience in Debris Management
. Key Personnel
. Training & Experience
. Equipment Resources
· Past Performance
. Letters of Reference
. Current Obligations
o
.. .~
...., TAG ~.,
GRINDING SERVICES, INC.
ORGANIZATIONAL CHART
City of Sunny Isles Beach, Florida
Jerry W. Brooks
CFO
I
.
.
John Bowden
Project Mgr - Documentation
Jeff Hill
Emergency Response Manager
.
.
.
o
Phillip Goodwin
Equipment Placement,
Assignment and Maintenance
Marion Brooks
Debris Operations
Bobby Montgomery
Debris Operations
-
Jean Davis
Project Coordinator -
Subcontractors
-
Charlene Daniel
Project Coordinator -
Documentation & Contract
Compliance
Dorothy Montgomery
_ Project Coordinator - Reports
and Reconciliation
o
o
..,., ..,.,
...., TAG....,
GRINDING SERVICES, INC.
EXPERIENCE IN DEBRIS MANAGEMENT
TAG Grinding Services, Inc. is a full-time Debris Management Specialist authorized to transact
business in the states of Florida, Georgia, Mississippi, Louisiana, Alabama, North Carolina, South
Carolina, Kentucky, Virginia, Oklahoma, Arkansas, and Texas. TAG Grinding Services, Inc. was
founded in 1996 and incorporated February 23, 1998 by Greg Rodgers, President/Vice President
and Jerry W. Brooks, SecretaryfTreasurer. TAG Grinding Service, Inc.'s main line of business is
debris collection, removal, reduction, and disposal. We manage the daily debris for over
5,000,000 people in the Atlanta, Georgia area alone - processing over 12,000 cubic yards of
debris every day for a total of 4,000,000 cubic yards per year. In addition, TAG performs all
services associated with Debris Management from land clearing and landfill management to
disaster response.
o
Jerry W. Brooks, CFO for TAG Grinding Services, Inc., has been involved in disaster response
since 1979, adding the grinding phase in 1996. In this time, Mr. Brooks, along with TAG, has
responded to over 100 disaster recovery operations. Since a key element in any successful
operation is getting started correctly, Mr. Brooks has personally started every recovery project
since our incorporation. From this experience, he has learned the difficulties related to disaster
recovery and how to operate in areas that have limited services, utilities, or means of
communication. He is often on site before any services or utilities are restored.
Unlike many other disaster recovery contractors, TAG Grinding Services, Inc. is a full-time
debris management contractor. We do not perform grading or general construction or just
broker disaster recovery work. Every day, TAG handles debris for the City of Atlanta, Georgia;
Cobb County, Georgia; Fulton County, Georgia; Carrollton County, Georgia; Monroe County,
Georgia; Covington, Georgia; Peachtree City, Georgia; Lagrange, Georgia; Gadsden, Alabama;
and Sylacauga, Alabama. We deal with debris on a daily basis year round. TAG operates a
20+-acre debris management reduction site 24 hours per day year round. In addition, all of the
equipment we own is geared towards debris management operations.
Our disaster debris experience consists of clearing roadways and canals, debris consolidation
management and reduction services, including grinding, management of landfill operations,
demolition and removal of damaged structures. Since it's beginning, TAG Grinding Services,
Inc. has done a variety of disaster recovery operations. These range from Clarke County,
Arkansas where TAG Grinding Services, Inc. cleared over 800 miles of road right-of-ways to the
removal of all trash and debris from 450 miles of canals for the City of Cape Coral, Florida. The
scope of work consisted of collecting, consolidating, reduction and disposal of all types of debris
while documenting all types and quantities of each type of debris. While continuing contracts
for debris collection, grinding, disposal and management with the City of Atlanta, Georgia;
Carroll County, Georgia; Cobb County, Georgia and others, TAG Grinding Services, Inc. has
been able to perform numerous disaster response contracts simultaneously.
o
Although it is not common for anyone Debris Management contract to exceed 750,000 cubic
yards, TAG has simultaneously managed multiple contracts that total over 750,000 cubic yards.
Listed below are a few of the disaster events with which TAG has been in charge of debris
management that exceeded 750,000 cubic yards.
o
When the Hurricane Charlie hit Florida in 2004, we had equipment and personnel available to
start work within 24 hours. Our first disaster response was in Cape Coral, Florida, with the next
being in Orlando, Florida. When Hurricane Francis struck Jupiter, Florida, TAG Grinding
Services, Inc. was requested to provide crews and management to assist them. At this time,
we were performing three contracts for disaster removal/reduction in Florida.
Hurricane Ivan then struck the panhandle of Florida and the pre-event contractor for Fort
Walton Beach, Florida was unable to respond in the timely manner required by the contract.
Mike Tatum with the City of Fort Walton Beach requested TAG Grinding Services, Inc. to begin
work within 24 hours. The conversation was held around noon and equipment and crews were
on site the following day starting work. In Ft. Walton, Florida, TAG removed over 200,000
cubic yards of debris on two passes, ground the debris, disposed of the ground debris,
reconditioned the reduction site, completing the entire job within 24 days. While at the same
time, TAG was maintaining three additional contracts in other Florida cities.
Next, the prime contractor in charge of storm debris for the Florida state roads requested
assistance from Tag Grinding Services, Inc. We were able to provide crews for this job while
still maintaining five (5) other disaster debris removal/reduction contracts ongoing in Florida
and still maintain our daily operations in the Atlanta area. The total debris managed under
these simultaneous contracts total 1,125,000 cubic yards.
When Hurricane Katrina hit the Gulf Coast area in 2005, TAG Grinding Services, Inc. responded
initially by managing and providing crews for the debris removal for Enterprise, Mississippi. We
completed this job within a one-week period after removing and disposing of a total of 20,000
cubic yards, and then began assisting Wayne County, Mississippi as a second tier contractor. In
addition, we were prime contractor for Quitman, Mississippi during this same period.
o While maintaining these two contracts, TAG Grinding Services, Inc. was approached by the
primary contractor for both Pike County and the City of Summit, Mississippi to begin assisting
them in debris removal. To this date, this contractor still owes TAG over $150,000 for this
work, which is not for the 10% retainage for this job. However, all of TAG's subcontractors and
suppliers have been paid as the work was completed.
Our next contract was as prime contractor for the debris removal for the Mississippi Department
of Transportation in both Newton and Lauderdale Counties, Mississippi. Although we were
second in the bidding process, TAG Grinding Services, Inc. was ultimately awarded the contract
due to the fact that the low bidder was unable to provide adequate equipment. In addition to
our contract with MDOT, TAG Grinding Services, Inc. began debris removal in Clarke County,
Mississippi as a second tier contractor. The debris managed under these contracts totaled
600,000 cubic yards.
()
As TAG Grinding Services, Inc. maintained these two contracts, Hurricane Wilma struck Cape
Coral, Florida and, since we held the pre-event contract for this area, we began managing the
debris and providing crews for the debris removal for this area. As we completed the debris
removal for MDOT and Clarke County, Mississippi, we were approached by Dunn RoadBuilders
to assist them in Jones County, Mississippi on removing leaners and hangers from county
roadways. In addition, Dunn requested our assistance on removing debris left on county
roadsides by Ash Britt and the Corp of Engineers when they initially held the contract. This
debris consisted of large stumps and heavy debris that neither Ash Britt nor their subcontractors
had equipment to remove. Our final contract under Katrina came as a second tier contractor in
charge of removing debris from county right-of-way in Perry County, Mississippi. While
managing these projects we removed over 100,000 dangerous limbs, over 5,000 dead or dying
trees, over 170,000 cubic yards of other debris, demolished 15 damaged buildings and cleaned
450 miles of canals.
o
o
o
-
Our past experience coupled with our extensive knowledge of debris management projects
make our company a strong benefit to any applicant. Our commitment to excellence and safety
have echoed in past performances and current contracts and allow our applicants the benefit of
being able to rely solely on one company for all their disaster assistance needs as well as the
assurance that the reimbursement procedure will be a smooth process.
-
o
.~ .~
..., TAG""
GRINDING SERVICES, INC.
KEY PERSONNEL
Jerry W. Brooks - started disaster debris recovery in 1979 and his grinding experience began
1996. Before he and Greg Rodgers started TAG Grinding Services, Incorporated, Jerry
personally worked as a sub-contractor and supervisor for prime contractors on disaster debris
removal projects from inception to completion. Jerry is on the job site and personally oversees
the start of each disaster debris recovery operation. Jerry can be reached at TAG Grinding
Services, Inc. headquarters, (256)-395-2243, or on his mobile, (678)-618-4129.
GreCJorv Roaers - has been in debris reduction and consolidation since 1985. He coordinates
equipment procurement and home/office activities.
Marion Brooks. Jr. - has been a project manager with TAG Grinding Services, Inc. since 1998.
He specializes in managing disaster debris restoration operations, but also oversees projects for
land clearing contractors, and landfill debris reduction. Before coming to TAG Grinding Services,
Inc., he was supervisor over clearing right-of-ways for Alabama Power for fifteen (15) years. His
mobile: (404)-473-0455.
o
Bobbv Montaomerv - started with TAG Grinding Services, Inc. in 1999. He has experience as
project manager and managing disaster debris restoration. He retired from Russell Corporation
in Alexander City, Alabama as a supervisor of production. His mobile: (256)-794-3957.
Dorothy Montgomery - has been in charge of documentation and bookkeeping for TAG
Grinding Services, Inc. on disaster responses since 1999. She handles all paper work pertaining
to disaster debris restoration and is trained and experienced in compiling all documentation to
assure the local government is reimbursed by FEMA. She retired from Liberty National Life
Insurance Company as an office manager in charge of accounting.
PhilliD Goodwin - operates as a project manager, coordinating jobs and equipment
placements for day-to-day operations. Mr. Goodwin has been with TAG Grinding Services, Inc.
since 1998 performing management duties in this field of personnel management and
equipment maintenance. Before coming to TAG Grinding Services, Inc., Mr. Goodwin spent 15
years as a foreman for logging crews. This consisted of managing equipment and personnel and
performing harvesting timber while m~eting federal, state, and local regulations.
Jeff Hill - has a civil engineering degree from Auburn University, retired with 32 years of
military construction management with the U.S. Army Corps of Engineers. Other duties were to
assist the Corps of Engineers Emergency operations and work with FEMA on disaster response
from 1989-2005. Started as a damage assessment estimator for public assistance and became
assessment team coordinator. Became Corp of Engineers coordinator for the state of Georgia.
He was a member of first response team and became a team leader of the housing strike force
for FEMA and action officer for Public Assistance Emergency Power. His mobile: (706) 718-
7274.
(J
John T. Bowden. A.B.. LL.B.. J.D.. Maitland. FL. - a retired attorney, holds these degrees
form Mercer University, Macon, Georgia and is a former FEMA employee holding Certificates of
Achievement through the Emergency Management Institute in the fields of Public Assistance
Operation, Introduction to Incident Command System, Principles of,Emergency Management,
o
o
o
Emergency Planning Decision Making and Problem Solving, Effective Communication
Coordinating Environmental and Preservation Compliance System, National Incident
Management System, Historical and Introduction to the National Response Plan.
His mobile: (678)-201-6068/ NEXTEL: 155*30339*3
Jean Davis - started with TAG Grinding Services, Inc. in 2002. She has experience with TAG
Grinding Services, Inc., doing disaster recovery, performing coordination of personnel and
estimating of debris contracts. She is TAG Grinding Services, Inc.'s office manager handling
dispatching of all trucks, billing, parts, procurement and payroll.
Charlene Daniel - has worked on several disaster-recovery operations initiating contracts for
TAG Grinding Services, Inc., assisting officials in proper paperwork and procedures, and as a
liaison between contract officials and actual crews. She has years of experience in insurance
regulations as well as training in environmental hazards (Le. mold, asbestos) and OSHA
regulations. Furthermore, she has received training from FEMA regarding debris removal and
reduction procedures, rules and regulations.
TAG Grinding Services, Inc., employs forty (40) employees that do various jobs from the
running of grinders and equipment to manual labor. TAG Grinding Services, Inc. operates thirty
(30+) tractor-trailer trucks, seven (7) grinders and over two hundred (200) additional pieces of
debris management equipment.
For more information please contact Jerry W. Brooks: (678)-618-4129 or (256)-395-2243.
--
o
.. ..
...., TAG....,
GRINDING SERVICES, INC.
TRAINING AND EXPERIENCE
Jerry Brooks, CFO for TAG Grinding Services, Inc., has been involved in the debris management
and removal services since 1979. In those years of experience, he has participated in over 100
disaster debris management projects. In addition, he is involved in the full-time debris
operations of TAG Grinding Services, Inc. He has attended USDA training on the proper
techniques and requirements for debris removal management as related to waterways and
stream management zones (SMZ).
o
Jeff Hill retired from the U. S. Army Corp of Engineers in February 2006. He received a degree
in Civil Engineering from Auburn University and had over 30 years with the Corp managing
construction at Fort Benning, Georgia. Starting in 1989 when Hurricane Hugo hit Charleston,
South Carolina, he worked with the Corp's Savannah District Emergency Management Division
responding to disasters. Jeff spent over 2 months doing damage assessments on the City of
Charleston and became very familiar with the damage assessment process. He went on to
become the Damage Assessment Team Leader on several disasters. He both prepared and
taught a Damage Surveying class, using FEMA guidelines on damage assessment and
surveying, to Corp personnel. In addition, he has been a part of the initial Damage Assessment
Team and the First Response Team, going in to disaster-affected areas in order to assess initial
damages for FEMA and the U. S. Corp of Engineers. Jeff also served as the Corp's State of
Georgia Coordinator on several events, coordinating Corp response and assistance to the state
in their time of need. Later appointed as Action Officer for Temporary Power for the U. S. Army
Corps of Engineers and FEMA and as a member of the Temporary Housing Team, he negotiated
contracts, located sites, and oversaw the installation of temporary housing.
Both Mr. Brooks and Mr. Hill have attended FEMA training on new guidelines and requirements
on stump removal and reimbursement procedures as well as the new payment system of
Federal Aid Roads.
John T. Bowden, A.B., LL.B., J.D., a retired attorney, holds these degrees form Mercer
University, Macon, Georgia, is a former FEMA employee. While serving with FEMA, he was
awarded the thirteen (13) National Incident Management System awards, including: Certificates
of Achievement through the Emergency Management Institute in the fields of Public Assistance
Operation, Introduction to Incident Command System, Principles of Emergency Management,
Emergency Planning Decision Making and Problem Solving, Effective Communication
Coordinating Environmental and Preservation Compliance System, National Incident
Management System, Historical and Introduction to the National Response Plan.
Charlene Daniel has had training in regards to environmental concerns of asbestos, mold, and
other airborne dangers, as well as soil stabilization and erosion control. She is experienced in
timber and debris management and is well versed on OSHA safety requirements. She has
participated in training classes provided by FEMA for public assistance policies and procedures.
She also has years of training in regards to insurance regulations and contract compliance as
well as training through FEMA is public assistance rules and regulations.
o Several of TAG Grinding Services' drivers have attended HAZMAT Driver Training. In addition,
both Marion Brooks, Jr. and Phillip Goodwin have attended classes on protection of utilities.
Please refer to key personnel listing for more details.
o
VIN
11796
59687
4271
912
21260
M9000
54546
3491
67671
89858
5963
79979
201928
11902
33Z00850
A52540
10377
201572
o
3202331
9402043
03-371
C11084
C11527
J21782
86548
A85057
K40737
C70321
5551
3871
9KK01613
9RL01134
96L2409
9MF00437
9BLO 1709
5BR01323
77V3354
K96132
851819
o
571
595
553
550
.~ ..,.,.
....., TAG ....,
GRINDING SERVICES, INC.
DEBRIS MANAGEMENT EOUIPMENT OWNED BY TAG
MAKE/DESCRIPTION
EQUIPMENT
Hyundai Rubber Tire Excavator with Grapple
John Deere Track Hoe
John Deere Telehandler with Grapple
Skid Steere
John Deere
Kubota Tractor
Hyundai Front End Loader with Grapple
John Deere Telehandler with Grapple
John Deere Front End Loader
John Deere Front End L9ader
Skid Steer
John Deere Backhoe
John Deere Loader
Cat Rubber Tire Excavator with Grapple
Cat Rubber Tire Loader
Komatsu Wheel Loader
Hyundai Rubber Tire Loader
Prentice Loader
Prentice Loader
Miller Bobcat Welder
Genie Light Tower
Powerscreen
Powerscreen
Athey Force Feed Loader
24" Portable Office Unit
TRACK MACHINES
Komatsu Excavator with Grapple
Komatsu Excavator with Grapple
Komatsu Excavator with Grapple
Komatsu Excavator with Grapple
Komatsu Excavator with Grapple
Komatsu Excavator with Grapple
Komatsu Excavator with Grapple
John Deere Excavator with Super Saw
Sotesbee Excavator Wood Stump Sheer
Cat Excavator
Cat Excavator
Cat Excavator
Cat Excavator
Cat Excavator
Cat Excavator
Cat Dozer
Cat Dozer
John Deere Dozer
GRrNDERS
Hogzilla (1000 H.P)
Hogzilla (1000 H.P.)
Hogzilla (750 H.P.)
Hogzilla (750 H.P.)
MODEL
214 BFf
690 ELC
3800
262B
850
3800
310 SG 1991
3200
214
936
WA380-5L
750
180
210C
MKLLL
7-120
PC200LC-6
PC200LC-6
PC200LC-6
PC200LC-6
PC200LC-6
PC210LCC-7K
PC200LC-7
320L
322L
215
214
963B
320B
D8K
D7
650GLPG
1464
1564
1464
1464
lDMX3323YC147246
Rl000172
o
4V5JCBBE2TR851426
4VHJCCBE8VVN860541
4V5JCBBE8VR854169
lFDPF70H3GVA42618
79521
53728
65201
53411
70987
58189
44666
13420
33832
lHTSDPPN3PH466396
6323
11103
lGDJ7H1D1XJ853085
5472
5602
27661
67742
45314
54403
50709
54407
98008
91631
29602
lFDNF80C6SVA70987
391715
872129
840202
831053
841494
590328
850709
CA15391
RN679428
017765
587093
947014
582200
115382
o
o
lFTNF20L94EA86475
lFTNF20L24EB66961
1FTHF26F2TEB71462
lFTNX20L54EB23616
lFTRVV8LX3KD84124
2GCEC19V4Y1365072
2GCEC19T4X1245964
lFTEFl5YSTLB60435
lN6SD11S9SC387438
lTFJX35F9SEA58192
2GCEC19V221165086
Mobark (860 H.P) Chipper
Diamond Z (6550 H.P.)
Vermeer (450 H.P.)
TRUCKS
Volvo T/A Boom Truck, Self Loader
Volvo T/A Boom Truck, Self Loader
Volvo T/A Boom Truck, Self Loader
Ford L800 with 50 cubic yard dump
Ford L800 with 50 cubic yard dump
Ford L800 with 41 cubic yard dump
Ford 450 with 30 cubic yard dump
Ford 250 with 40 cubic yard dump
Ford F800 with 40 cubic yard dump
International 4900 with 45 cubic yard dump
International 4700 with 45 cubic yard dump
International VV/44 with 44 cubic yard dump
International VV/4O with 40 cubic yard dump
International 4000 with 40 cubic yard dump
Chevrolet Kodiak with 38 cubic yard dump
Chevrolet with 35 cubic yard dump
GMC C7500 with 38 cubic yard dump
GMC Topkick with 42 cubic yard dump
GMC Topkick with 38 cubic yard dump
GMC with 35 cubic yard dump
Freightliner with 41 cubic yard dump
Peterbilt with 50 cubic yard dump
Peterbilt with 50 cubic yard dump
Peterbilt with 100 cubic yard dump
Peterbilt 379 with 100 cubic yard dump
Peterbilt 379 with 100 cubic yard dump
Peterbilt 379 with 100 cubic yard dump
Kenworth with 50 cubic yard dump
Ford Dump Truck
Peterbilt 379
Peterbilt 379
Peterbllt 379
Peterbilt 379
Peterbilt 379
Peterbilt 379
Peterbilt 379
International paystar 5000 T/A Mixer Truck
Volvo Tractor
Mack R688ST
Kenworth Tractor
VVestern Star Tractor
Freightliner
Volvo
SERVICE TRUCKS, ETC.
Ford F250
Ford F250
Ford F250
Ford F250
Ford
Chevrolet 1500
Chevrolet
Ford
Nissan
Ford
Chevrolet
2850
1248B
400
o
1FTNF20L54EB18998
1GNEK13Z22R143652
1FMEU15H7TlB37689
RB27195
44680
o
1PLE045261PG52060
1PLE04529VPA22961
MS03HM00200002802
lZ92A4227TT029120
1Z92A4220TT029119
1PLE042273PH53051
1E1U1Z287RRD16133
4LF45483753503873
1~04837BM048023
1Z92A4220TT029119
1NT120423K10X0464
1PLE04223VPK228817
1PLE04229VPK228837
T587156
11957
MA Y544534
147824M
S9650
17218968
1JJV452C6JL116891
1HTLDUXMXEHA33832
1H2V0452XFH042524
2HTTGKCTOGCA15391
lJJV452P8GLl01141
lJJV452C9GLl01391
1H2V04524GH063810
1JJV452C7JL116267
lJJV45C2C7JL116222
1L01A4826M1093848
lS12E848XPE354205
1 ~04834RM058024
1FUYDSEB85H582200
1C95156285P389399
1PLE04528YPK29732
M503HM00200002802
855961
T74K64023
FHW580739
T587156
FA700T45702
1GRAA9021CS069303
T558677
T535089
T535090
118357
199209
29311
20655
26926
26671
26672
o
Ford F250
Chevrolet Tahoe
Ford Bronco
Volvo 2-Ton Mechanic Truck
Ford Fuel Truck
TRAILERS
Peerless Walking Floor
Peerless Walking Aoor
Wilson Dump Trailer
Innovation
Innovation
Peerless
East Aluminum
Fontaine
Tra iI king
m
Nabors
Peerless
Peerless
East Walking Floor
Utility Trailer
Fruehauf 45' Van
Budd Trailer
Trim Trailer
Trim Trailer
Wabash National Trailer
International Trailer
Fruehauf Trailer Van
International Trailer
Wabash National Trailer
Wabash National Trailer
Fruehauf Trailer Van
Wabash National Trailer Van
Wabash National Trailer Van
Lufk Trailer
Strickland Trailer Van
Trailking Trailer
Fruehauf Trailer
CPS Trailer
Peerless Trailer
Shop Dump Trailer
Gind Chip Trailer
UTOP Chip Van Trailer
Fruehauf 45' Open Top Trailer
Home Trailer
Mono 45' Open Top Trailer
Great Dane Trailer
Home Utility Trailer
Home Utility Trailer
Home Utility Trailer
Stick Chip Trailer
m Chip Trailer
Peerless
Peerless
Peerless
Peerless
Peerless
o
G
o
~
.~ .~
...~ TAG ...~
GRINDING SERVICES, INC.
PAST PERFORMANCE
Project Contact Event Scope of Work Contract Equipment
Location Amount Used
Perry County, Kelly Bros. Hurricane Katrina Storm Debris $148,000 20 Trucks
MS (601) 735- 06/06 Removal, Leaners 4 Loaders
2541 & Hangers from
MOOT ROW
Jones County, Ken Nance Hurricane Katrina Storm Debris $2,400,000 50 Trucks
MS (601) 649- 01/06 - 05/06 Removal, Leaners 10 Loaders
4411 & Hanger on 1 Grinder
Public ROW
City of Cape Mark Hurricane Wilma Storm Debris $650,000 10 Trucks
Coral, FL Ridenour 10/05 - 12/05 Removal from 3 Loaders
(239) 574- Public ROW
0724
Newton and Dana Hurricane Katrina Storm Debris $6,642,000 44 Trucks
Lauderdale Cleveland 09/06 - 12/06 Removal from 8 Loaders
Counties, MS (601) 655- MOOT ROW
8954
Clarke County, W. C. Pitts Hurricane Katrina Storm Debris $321,000 10 Trucks
MS (601) 735- 09/06 Removal from 3 Loaders
4855 Public ROW
Quitman, MS City Hall Hurricane Katrina Storm Debris $222,000 20 Trucks
(601) 776- 09/06 Removal from 4 Loaders
3728 Public ROW
Wayne W. C. Pitts Hurricane Katrina Storm Debris $570,000 30 Trucks
County, MS (601 735- 09/06 Removal from 6 Loaders
4855 Public ROW
Enterprise, MS City Clerk Hurricane Katrina Storm Debris $189,000 9 Trucks
(601) 659- 09/06 Removal from 6 Loaders
7971 Public ROW
City of Cape Mark Hurricane Charlie Storm Debris $2,000,000 15 Trucks
Coral, FL Ridenour 08/04 - 02/06 Removal from 4 Loaders
(239) 574- Public ROW,
0724 Remove Storm
Debris from
Canals
Jupiter, FL Hurricane Charlie Storm Debris $150,000 10 Trucks
2004 Removal from 3 Loaders
Public ROW
Santa Rosa & Hurricane Charlie Storm Debris $50,000 15 Trucks
Okaloosa 2004 Removal from 3 Loaders
Counties. FL Public ROW
Fort Walton Mike Tatum Hurricane Charlie Storm Debris $2,475,000 40 Trucks
Beach, FL (850) 833- 2004 Removal from 10 Loaders
9253 Public ROW
New Ellen, SC Anita Smith Ice Storm Storm Debris $36,000 6 Trucks
(803) 652- 04/04 Removal from 2 Loaders
2214 Public ROW,
Trimming
Damaged Limbs
o
o
o
and Broken
Trees, Reduction
and Disposal of
Debris
Manning, SC Paul J. Ice Storm Storm Debris $400,000 40 Trucks
Bjorkman 03/04 Removal from 8 Loaders
(803) 435- Public ROW,
8477 Trimming
Damaged Limbs
and Broken
Trees, Reduction
and Disposal of
Debris
Talladega Tornado Storm Debris $730,000 25 Trucks
County, AL 07/03 Removal from 5 Loaders
Public ROW,
Trimming
Damaged Limbs
and Broken Trees
Cabarrus Ice Storm Storm Debris $150,000
County, NC 2002 Removal from
Public ROW
Virginia Ice Storm Storm Debris $900,000
2002 Removal from
Public ROW
City of H. Layton Ice Storm Storm Debris $250,000 50 Trucks
Thomasville, Paul 12/02 Removal from 10 Loaders
NC (910) 475- Public ROW, 1 Grinder
4216 Trimming
Damaged Limbs
and Broken
Trees. GrindinCl
Salisbury, NC Richard Ice Storm Storm Debris $700,000 100 Trucks
Kelly/Rick 12/02 Removal from 20 Loaders
Manger Public ROW,
(704) 638- Trimming
5270 Damaged Limbs
and Broken
Trees, Reduction
and Disposal of
Debris
China Grove, Ice Storm Storm Debris $90,000 40 Trucks
NC 12/02 Removal from 4 Loaders
Public ROW
Marksville, LA Myron Hurricane Lili Storm Debris $90,000 20 Trucks
Gagnard 10/02 Removal from 4 Loaders
(318) 253- Public ROW,
9500 Reduction and
Disposal of Debris
Cheneyville, Ollie Crittle Hurricane Lili Storm Debris $60,000 6 Trucks
LA (318) 279- 2002 Removal from 2 Loaders
2155 Public ROW
Reduction and
DisDOsal of Debris
Cotton port, LA Hurricane Lili Storm Debris $21,000 10 Trucks
2002 Removal from 2 Loaders
Public ROW,
Trimming
o
o
o
-
Damaged Limbs
and Broken
Trees, Reduction
and Disposal of
Debris
Hennessy, OK Mayor Tim Ice Storm Storm Debris $225,000 20 Trucks
Riddle 02/02 Removal from 5 Loaders
(870) 246- Public ROW,
8840 Trimming
Damaged Limbs
and Broken
Trees, Reduction
and Disposal of
Debris
Clarke County, Jim Burns 02/02 Clearing, $3,000,000 100 Trucks
AR (870) 246- Collecting, 10 Loaders
8840 Grinding, and 1 Grinder
Disposal of Debris
from 800 miles of
Public ROW
Gurdon, AR Jim Burns 02/01 Storm Debris $115,000 10 Trucks
(870) 246- Removal from 2 Loaders
8840 Public ROW 3 Bucket
Reduction and Trucks
Disposal of Debris
Dekalb Jerry Denny Ice Storm Manage Two $650,000 2 Grinders
County, GA (404) 244- 02/01 Dumpsites and 4 Excavators
4894 Perform All Debris
Reduction
Houston, TX Hurricane Floyd Storm Debris $500,000
09/99 Removal from
Public ROW
Reduction and
Disposal of Debris
Moore County, Glenn Pierce 03/99 Trimming $800,000
TN (931) 759- Damaged Limbs
7800 and Broken
Trees, Removing
Dead Trees,
Backfilling Holes
Left By Stumps
Franklin City, Joe Grant 02/99 Storm Debris $45,000
TN (913) 967- Removal from
2755 Public ROW,
Reduction and
Disposal of Debris
University of Travics 02/99 Storm Debris $10,000
the South, TN Hawkins Removal from
(931) 598- Public ROW,
1453 Reduction and
Disposal of Debris
o
o
o
r_
William R. "Bill" Minor
Northern District Commissioner
-
LMry L. "Burcl1~ Brown
wcutive Dirccror
~~..~ -
~j..",,"" .
-.. MISSISSIPPI DEPAATMENT OF 1'f/ANSPOONK)N
Harry Lee Jame..
Deputy DirectOrl
Chief Engineer
William R. May
District Engineer
Dick Hall
CcntnI o;,ttict CommissiOl1"'r
Wayne H. Brown
Southern Di.<tria Commissioner
P. O. B... 90 / N<w"'., Mimmppi 39345 / Ttlrph.... (601) 683.3341 / FAX (60l) 683-7030 / """"./J.MDOr......
P.o. Box 4416
Meridian, MS 39304-4416
]WlC 15,2007
RE: Recommendation for TAG Grinding
To Whom It May Concern:
During the cleanup following Hurricane Katrina in the fall of 2005, I had the opportunity to wark ....ith
TAG Grinding. TAG was dir1:ctly respons~ble for the clean-up ofNewWn and Lauderdale Counties in
Ea..t-Central Mississippi. .
All TAG personnel worked closely v,rith my inspector at all times. They ....-ere ever vigilant of safety
requirements. I personally rode through their worl; zones on numerous occasiollS and witnessed the
work. All equipment and personnel were kept as far from the travel lanes as possible to ensure the
safety of the traveling public. All wait times were kept to a minimum in order to prevent unnecessary
inconvenience to the people of thc stnte of Mississippi. All of the supervisors would stop whatever tht.-y
were working on to address a specific request if I had one. I was always satisfied with the work that
they did, and feel that the taxpayers of Mississippi got the best value for their dollar.
Hurricane Katrina was my first experience with such widespread damage and destruction. I sincerely
hope that I DevCT have to deal with this sort of project again. However, ifl am faced with this challenge
again, I hope TAG Grinding is there to work with us. 1 feel they would be an asset to anyono facing this
sort of work, weather it bc due to hurricones, ice storms, or other forces of nature.
lfyou haw any questions, please feel free to contact me at my office (Phone: 601-483-1040).
~[1~~
Dana G. Cleveland
Resident Engineer
DGC/dlgc
pc: Pe..onal File
o
e .......J
~;'\~
City of Fort Walton Beach .f.~q
Amoric.'s Most B_utiful Beaches ~:
. . 143 Hollywood Boulelr.ird NW. P.O. Box 4Q09 . Fort Wanon Beach. FL 32549'~v J"." ~.L""'~
. (850) 833-9523 . Fax (850) 833-9643 ~.- : .
t'lIre1l:.smg D4Ipartment
TDD (850) 833-9925
June 29, 2007
Re: . Letter of Recommendation for TAG Grinding Services
To Whom It W,ay Concem:
The City of Fort Walton Bellch contracted with TAG Grinding Services at Palmetto,
Georgia to ,emove debris. C&D and white goods from Hurricane Ivan. TAG Grinding
Sel\lices completed this work in an excellent manner.
The City of Fort Walton Beach currently ha$ a contract with TAG Grinding Services for
disaster sel"llices.
I would highly recommend this company to perform debris removal SCl"llices.
Sincerely,
M.4/tl.~
Michael C. Tatum
Purchasing Director
MCT Imhj
o
~n..GnQn'J vv~ R~:~t LOOZ/10/~O
o
o
.
o
-
."'.':".-..
City of Cape Coral
To Whom It May Concern,
r-
I have been working for the City of Cape Coral for 15 years. I am one of the City's four
Project Managers and one of my more recent tasks was to oversee the clean up of our 440
mile canal system. These canals were heavily littered with all types of foreign debris,
especially downed trees as II result of Hurricane Charley on August 13th of 2004. We
were able to secure 2.9 million dollars in funding from the U.S. Department of
Agriculture for this clean up effort and contracted with Tag Grinding for the largest
portion of this work. As oftoday, 3-2-05, we are about 95% complete with the project
and Tag Grinding crews have removed over 100,000 cubic yards ofborticultural debris
and 2500 tons of miscellaneous debris.
:-
This has been a fairly smooth project with very few problems. This in large part is due to
the excellent commWlication ai1d cooperation from Jerry BrookB of Tag Grinding.
Whenever any problems, scheduling conflicts or billing concerns came up. he was always
a phone call away and would immediately itddress any concerns before they became a
problem. We informed him early on of all of the USDA guidelines and requirements as
far as documentation and regulations and they made the process easy by the amount of
communication and cooperation provided. It seemed as we dealt with new hurdles along
the way, he was always willing to take on whatever additional task we would throw at
them.
Based on our expen(:nce with Tag Grinding. we would not hesitate to utilize their
services again or recommend them to other municipalities with the same needs.
If you have any questions or need any additional info you may contact me at;
:-
Mark Ridenour
Project MlIIJager
Public Works Department
City of Cape Coral
PO Box 150027
Cape Coral, Florida 33915-0027
Tel. 239-574-0724
Fax 239-574-0732
EmaiI.MridenoU@capecoral.net
Public Works Department _ Administration. City of Cape Coral. P.O. Box 150027 . Cape Coral, Florida 33915-0027
(239) 242-3200 . Fax (239) 574-0732 . htlP:JJwww.capecoral.net
Co-Countv Seat - Lee County. Florida
g
o
o
Ju1.24. 2008 11:19AM
No. 0129 P. 2.
! ~~~~1ank.
www.ucbl.com
July 24,2008
RE: BANKING RELATIONSHIP WIlli TAG GRINDING SERVICES, INC.
~o Whom It May Concern:
TAG Grinding Services, Inc. has been a valued customer of United Community Bank
flnla 151 Community Bank flnla Fairbum Banking Company, for approximately ten years,
when they opened their first deposit account with us. Since that time, TAG Gllnding
Services has opened other deposit accounts and has had numerous loans with us, which
have been maintained in a highly satisfactory and professional manner, according to the
agreed upon tenns. Their high credit with us has been $1,000,000.00 for a Line of
Credit, which was renewed on March 19,2008 for 16 months.
We have the highest regard for the relationship we have developed over the years and
look forward to their continued patronage in futUl'e financial endeavors.
If I may be of further assistance, please don I t hesitate to call.
Sincerely,
~tI
Howard V. Tumer, Jr.
Executive Vice-President
65 Washington Strul
Post Ofiice Box 37
Fairburn, Georgia 30213
770.964.1551
Pax 770.964.6076
Member FDIC · Equal HousinR Lender a
o
o
o
~ - --..........
..
....,
GRINDING SERVICES, INC.
.~
TA G ...,
CURRENT OBLIGATIONS
Project Location Contact Event
Atlanta, GA Charles Helton Pre-Event Disaster Contract and
(404) 787-9556 Annual Contract for Yard Trimmings
Carroll County, GA Geraldine Earnest Landfill Reduction and Disposal of Mulch to an
(770) 832-1233 EPA Approved Burn Facility Since 2003
Gadsden, AL Howell Matthews Landfill Reduction and Disposal of Mulch to an
(256) 549-4500 EPA Approved Burn Facility
Sylacauga, AL Eddie Bentley Landfill Reduction and Disposal of Mulch to an
(256) 401-2428 EPA Approved Burn Facility
Monroe County, GA Maxine Allen Landfill Reduction and Disposal of Mulch to an
(478) 992-5049 EPA Approved Burn Facility
laGrange, GA Landfill Reduction and Disposal of Mulch to an
EPA Approved Burn Facility
Peachtree City, GA Angela Egan Landfill Reduction and Disposal of Mulch to an
(770) 487-7657 EPA Approved Burn Facility
International Paper Company Erin Loar Debris Clearing and Maintenance for Wood
Selma, AL (334) 875-2430 Yards
Cobb County, GA Dick Crouch Landfill Reduction and Disposal of Mulch to an
(770) 528-1031 EPA Approved Burn Facility
Palmetto, GA Jerry Brooks Own and Maintain Reduction Site for Vegetative
(770) 969-7980 Debris
Fulton County, GA Pre-Event Disaster Contract and
Annual Contract for Yard Trimmings
Cape Coral, FL Mark Ridenour Pre-Event Disaster Contract
(239) 574-0724
Tallapoosa County, AL Joe Paul Boone Perpetual Disaster Contract
(256) 825-1078
Fort Walton, FL Michael C. Tatum Pre-Event Disaster Contract
(850) 833-9523
State of North Carolina James McCormick Pre-Event Disaster Contract
Department of Transportation (919) 733-3403
Escambia County, FL Larry W. White Pre-Event Disaster Contract
(251) 867-0208
Monroe County, AL Beth Cooley Pre-Event Disaster Contract
(251) 743-4107
Fulton County. GA Landfill Landscape Maintenance
Florida Fish & Wildlife Dan McDonald Roadside Mulching -Big Bend WMA
Commission (850) 838-9016
Cullman County, Alabama Fred Penn Pre-Event Disaster Contract
(256) 796-1336
Clay County, Alabama Brian Smith Pre-Event Disaster Contract
(256) 396-9393
Gulf Stream, Florida Rita Taylor Pre-Event Disaster Contract
(561) 276-5116
o
o
Q
TAB 3
. Management Plan for the Project
. Understanding of Project
Requirements
. Management Plan for Event Types
. Subcontracting Policy
-
w
.. .~
...., TAG....,
GRINDING SERVICES. INC.
MANAGEMENT PLAN FOR THIS PROJECT
Jerry W. Brooks is the CFO of TAG Grinding Services, Inc. and is completely responsible for any
disaster operation of TAG Grinding Services, Inc. Mr. Brooks will be on site to assure that the
operation is started correctly and will respond to all calls made to him. He will be available 24
hours per day and is the only CEO known to respond directly to disaster events and be available
to the clients 24 hours per day. Mr. Brooks can be reached at the following numbers:
Office: (256) 395-2243
Cell: (404) 473-1266
Cell: (678) 618-4129
Throughout the debris recovery mission John Bowden and Jeff Hill will be readily available to
assist the client in proper record keeping to insure prompt reimbursement from FEMA and to
insure smooth, efficient disaster response.
o
The management of the individual operation will be as per that in the key personnel roster.
The specific individual responsible for each operation is listed therein. If there is any reason the
client is not satisfied with the response from any of these individuals, Mr. Brooks will be
available to resolve it.
TAG Grinding Services, Inc.'s Disaster Response Plan is as follows: With the notification to
proceed, Mr. Brooks will contact the designated officials to schedule the pre-location of personal
equipment and pre-qualified subcontractors. All equipment and will be checked in through
appropriate procedures, with all equipment placarded as required. Equipment and personnel
will respond to the designated locations to begin emergency operations within 24 hours. TAG
Grinding Services, Inc. will be in constant contact with City personnel during this time period to
assure all areas of priority are attended to in a timely manner. During the first 24 hours,
operations will be as follows:
Within 6 Hours of Notice:
· Key staff of TAG Grinding Services, Inc. will meet with City officials to define a
scope of work and establish priorities.
· Review of established TDSRS sites.
· Mobilization of sufficient crews to begin emergency road clearing and other
primary emergency services.
o
6-12 Hours of Notice:
· Mobilization of adequate personnel to prepare TDSRS sites.
· Mobilization of additional crews to meet priorities set by the City.
· Establishment of proper communication directories.
· Establishment of Field Office.
· Begin initial cleanup operations.
12-24 Hours of Notice:
· Continuation of mobilization of crews, including subcontractors if required, to
satisfy priorities set by City officials.
()
· Presentation of an event-specific detailed operations plan to City officials.
· Assignment of inspectors.
· Conduct safety and operations meetings.
· Begin measurements of haul vehicles.
· Begin load and haul operations.
· Begin reduction operations.
· Deliver initial project status report.
After the initial 24 hours, TAG Grinding Services, Inc.'s managers will coordinate with local
authorities to determine areas of priority. The documentation crew will document existing
conditions in these areas of debris collection and consolidation and reduction will begin.
Throughout the entire process, TAG Grinding Services, Inc.'s managers will be readily available
to respond to any change in plans as requested by the City's designated representatives. All
activities will be documented on daily reports and a copy of each daily report will be provided to
the City the following day.
Daily, or as requested, TAG Grinding Services, Inc. managers will meet with the City to review
progress, concerns and any changes in priorities.
o
Every Friday, all subcontractors working directly for TAG Grinding Services, Inc. will be paid for
the work they have accomplished the previous week. A release is signed upon receipt of
payment and this release will be available to the City is requested. With this guarantee, the
subcontractors that work with TAG Grinding Services, Inc. will perform their jobs safely and
quickly to insure a timely conclusion to the debris operation. Although weekly payments are
not the norm for most prime contractors, TAG Grinding Services, Inc. has found that paying
subcontractors on a weekly basis assures the acquisition and retention of the best
subcontractors available.
PROJECT MANAGEMENT
o
A. lYPICAL CREW COMPOSmON
1. Pickup Crew
a. Site Supervisor
b. Loader Operator
c. 3-5 Trucks
d. Ground Crew of 1-2 people
e. Traffic Control
2. Temporary Storage Facility
a. Site Supervisor
b. Tower Observer
c. 3 Equipment Operators
d." Traffic Control
3. Reduction Site
a. Site Supervisor
b. 2 Equipment Operators
c. Maintenance Personnel
d. Traffic Control
4. Rnal Disposal
a. Site Supervisor
b. Loader Operator
c. Trucks (# and size as needed)
d. Traffic Control
-
B. GUARD REMAINING INFRASTRUCTURE
(>
Through training and educational procedures of TAG Grinding Services Inc., all employees
undergo a strenuous protocol of safety procedures and infrastructure preservation. If by
chance there is damage to infrastructure caused by TAG Grinding Services, Inc. or by one of its
subcontractors, prompt repair will be made at no expense to the applicant.
The vehicles of TAG Grinding Services Inc. and other related equipment are equipped with
sufficient tools to make immediate corrections and repairs. However, if these measures are not
sufficient, other measures will be taken to insure a trouble free atmosphere for the applicant.
C. QUALTIY ASSURANCEI CONTROL ACTlVmES
With the extended experience of TAG Grinding Services Inc. and its commitment to
excellence, measures are always underway on a daily basis to insure control activities. All
employees of TAG are in constant contact with each other through the most modern technology
and control measures are implemented to assure that the debris plan runs smoothly. Quality
Control Organization available upon request.
D. COMMUNICATIONS NETWORK
All personnel of TAG Grinding Services Inc. have in their possession cell phones that enable
an ongoing network with both TAG's employees as well as the applicant. Cell phone numbers
will be readily available to all applicant managers, monitors, and/or coordinators.
E. SELF-CONTAINMENT CAPABILTIY
o TAG Grinding Services, Inc. rarely experiences any problems with self-containment
capabilities as they draw on the years of experience in setting a network capable of
implementing our debris management plan, wherever we may be functioning. TAG Grinding
Services, Inc. has at its disposal over two hundred (200) pieces of debris management
equipment that eliminate any logistical problem that may arise. Experienced employees are
made available to handle such items as temporary housing for employees, fuel deliveries and
the supply of power through generated power.
F. OPERATIONS OF TEMPORARY DEBRIS STORAGE AND REDUCTION SITES
After agreement with the applicant as to the location of reduction sites, a video of the sites
will be made to preserve the integrity and to assure that it is returned to its original condition.
TAG Grinding Services, Inc. will supervise the erection of any of these sites as directed by the
applicant and within FEMA guidelines. Included in these procedures will be traffic direction of
ingress and egress of haul vehicles, location of dump piles, and other safety procedures
implemented in the reduction site.
G. DISPOSAL OF WOOD DEBRIS
o
All of the wood debris shall be collected and disposed of in a safe manner. The wood
debris collected shall be ground into mulch and disposed of as determined best appropriate by
the applicant. Once wood debris is ground and the fuel wood is hauled, there will be no further
liability with the wood debris for the applicant.
I. DISPOSAL OF C&D DEBRIS
-
All C&D debris shall be collected and disposed of in a safe manner. It will be separated
accordingly imd hauled to the appropriate landfill(s).
o
J. EOUIPMENT
Mechanically loaded trucks and trailers will be used, from small yardage capacity to
seventy (70) plus cubic yard capacity. The number of pieces of hauling equipment initially
mobilized will be thirty (30) plus with fifteen (15) loaders. The evaluation for the need of
additional equipment will be conducted daily. If the need for additional equipment is needed, it
can be provided within six (6) hours.
K. CONSTRUCTING TOWERS
Because of safety concerns of people climbing observation towers, it has been
recommended by some FEMA personnel that man lifts be used as opposed to these towers. We
have adopted this policy and will rent man lifts capable of accommodating 3 to 4 observers. In
addition, we will provide an approved cover for the man lift if none is provided with the rental.
Although this is our standard policy, we ill construct the needed towers to the specification
requirements of the U. S. Army Corp of Engineers if the applicant deems this preferable.
L. PUBLIC ANNOUNCEMENTS/NOTICES ON PROPOSAL VENUES
o
We will provide weekly notices of the debris removal schedule via advertisements in the
Sunday edition of the local paper each week during the duration of the contract. These
schedules will be coordinated with the Contract Administrator. Additionally, we will advertise
these notices on local radio stations for a minimum of 30 seconds each and will run these
advertisements a minimum of 3 days per week. All notices will be approved by the Contract
Administrator prior to release and will contain a description of work to be performed, how
debris should be places on the right-of-way, what is considered eligible debris, and the schedule
for debris removal.
M. TRACKING AND RECORDING WORK FOR INVOICE AND AUDIT PURPOSES
Daily reports are necessary to track the quantities of debris processed each day and to
monitor any potential problems that may develop. Using our unique computerized program in
tracking and invoicing all work, we have seldom had any discrepancies and, in the event of
discrepancy, have been able to quickly and efficiently resolve it. Daily reports, in both paper
and electronic version, will be submitted to the appropriate official(s) each morning for review
of the previous day's activities. In addition, we will designate one person for each collection
site to assist the applicant in monitoring each debris ticket as it is written. This process insures
officials of quick and accurate reimbursements from FEMA or other government agencies by
allowing review of the applicant's records with those of TAG Grinding Services, Inc. to alleviate
discrepancies when invoicing federal agencies. Before final payment is made, we will provide
the Contract Administrator with a release of claims and certification that all subcontractors of
TAG, as well as all suppliers of both TAG and its subcontractors, have been paid.
o
We are currently developing additional software that will enable us to use "smart cards".
This program is per recommendations from FEMA and will further eliminate discrepancies that
may occur with current paper/electronic documentation. All loads will be designated at the
origination point with GPS location, which will assist in the qualification of debris and expedite
reimbursement from FEMA. Furthermore, this program provides for full electronic data storage
at both loading and dumping sites and can be downloaded daily, or at any required time,
directly into applicant computers. .
Q
o
o
N. LOCAL PARTICIPATION AND SUBCONTRACTING POUCY
It is the policy of TAG Grinding Service, Inc. to provide employment opportunities for all
qualified subcontractors and individuals that we can hire. Therefore, upon award of the
contract or issuance of a notice to proceed, we will advertise with local newspapers/radio
stations listing services needed. All applicants will be screened for qualifications prior to being
hired to fill vacant positions. We will give preference to minority-owned businesses.
Due to our records of weekly payroll for the previous workweek, there are a large
number of subcontractors that have worked with us on previous disaster efforts that begin
contacting us as soon as there is any word of possible disaster. These subcontractors are
experienced and highly qualified for disaster recovery services and are familiar with are method
of management. Therefore, we will use many of these subcontractors if needed.
O. OTHER UNI~UE SERVICES PROVIDED BY BIDDER
Although TAG Grinding Services, Inc. specializes in vegetative debris recovery and
management; we are also well versed in demolition of damaged buildings and the management
and safety concerns associated with this type of demolition. TAG is closely associated with
other types of emergency response contractors and can provide any type of emergency services
for ice, water, generators, emergency temporary shelters, temporary and permanent roofing,
temporary housing, and response to hazardous waste remediation. For additional information
on these services, please contact our office.
o
..
TAG ....,
GRINDING SERVICES, INC.
..
....,
UNDERSTANDING OF PROJECT REQUIREMENTS
DISASTER RESPONSE ACTION PLAN
PURPOSE
· To provide management, supervision, labor, equipment, and tools to provide service to
the City of Sunny Isles Beach for the removal and disposition of debris caused by a
major disaster.
· To facilitate and coordinate the management and removal of debris following a disaster
in order to mitigate against any potential threat to the lives, health, safety, and welfare
of the impacted citizens, expedite recovery efforts in the impacted area, and address
any threat of significant damage to improved public or private property.
SITUATION
o
· Natural and manmade disasters precipitate a variety of debris that include, but are not
limited to, such things as trees, gravel, sand, building construction material, vehicles,
personal property, and hazardous materials.
· The quantity and type of debris generated from any particular disaster will be a function
of the location and kind of event experienced, as well as its magnitude, duration, and
intensity.
· The quantity and type of debris generated, its location, and the size of the area over
which it is dispersed will have a direct impact on the type of collection and disposal
methods utilized to address the debris problem, associated costs incurred, and how
quickly the problem can be addressed. .
. In a major or catastrophic disaster, many state agencies and local governments will
have difficulty in locating staff, equipment, and funds to devote to debris removal, in the
short-term as well as long-term.
CONCEPT OF OPERATIONS
Emergency Operations Center Activation
()
· TAG Grinding Services, upon issuance of a notice to proceed, will provide an Emergency
Operations Center (EOC) at a designated site pre-appointed through discussion with
designated officials of Sunny Isles Beach, Florida. If this pre-appOinted site has received
damage making it unsafe or unsuitable for use, TAG Grinding Services, Inc. will provide
a temporary EOC until a more permanent site can be established.
· The Debris Management Task Force (DMTF) will be made up of management personnel
of TAG Grinding Services, Inc. to include Jerry Brooks; Emergency Operations Director;
Jeff Hill, Chief Project Coordinator; John Bowden, Contract Compliance; Charlene Daniel,
Project/Documentation Coordinator and other supervisory personnel as needed, as well
as designated officials for the City. Complete assignment of specific duties as required
by the event will be assigned at this time.
· The EOC and staff will assist the City in review and documentation of the extent of
damage and resulting debris and assist in the appropriate directives to implement the
restoration process.
~
. TAG Grinding Services will assist the City in creating an appendix that contains a listing
of key points of contact and forward this appendix to all appropriate personnel.
w
Estimating the Type and Amount of Debris
. Although it is not standard procedure for contractors to assist in the estimation of
debris, TAG Grinding Services, Inc. can provide the required Debris Estimating Model as
provided by the United States Army Corp of Engineers (USACE) Emergency Management
staff. In addition, we will assist City officials in debris estimation if requested.
. Once the area has been assessed, actions will be taken to implement Phase I debris-
clearing procedures.
Site Selection Priorities
. The number of Temporary Debris Storage and Reduction (TDSR) sites will be based on
the estimation of debris. TAG will provide assistance to the City to obtain additional
TDSR sites if so deemed necessary. Preliminary TDSR sites will be established prior to
an event.
. TDSR sites will be prioritized as follows:
First Priority: Pre-determined TDSR sites
Second Priority: Public property within the damaged area
Last Priority: Private property
Pre-Designated TDSR Sites
G
. Pre-identified TDSR sites should be identified on City/County maps and provided to TAG
Grinding Services, Inc.
. Contact information for the designated agency responsible for TDSR site should be
forwarded to TAG (e.g. Solid Waste Authority, Public Works, etc.)
. Detailed information should include exact location, size, available ingress and egress
routes and results of an environmental assessment and initial data samples. If this
information is not available, TAG will provide assistance in establishing this information.
. Baseline date should include videotapes, photographs, documentation of physical and
biological features, and soil and water samples. TAG Grinding Services can provide
assistance in establishing this baseline information.
. The list of TDSR sites should be reviewed annually and updated as necessary as part of
the normal maintenance plan. This information should be forward to TAG Grinding
Services, Inc. as it is made available.
TDSR Site Preparation
. Upon review of the TDSR site, TAG Grinding Services, Inc. will prepare actions that need
to be accomplished.
. An operation layout, which includes ingress and egress routes, will be established and
forwarded to appropriate City officials.
. Baseline information will be updated as required.
Existing Landfills
o · City officials should identify and locate all city, county and private landfills.
. Restrictions and limitations for these landfills should be forwarded to TAG, along with
the name and location of each site.
-
. Tipping fees will be the responsibility of the City unless otherwise noted in the contract
documents.
o DEBRIS REMOVAL
General
. Hurricanes and other natural disasters can generate unprecedented amounts of debris in
a few hours or a few minutes. The debris may be equally heavy in both urban and rural
areas depending on the magnitude of the tree blow-down and associated structural
damage such as homes, businesses, utilities, and signs.
. Debris removal, regardless of source, becomes a high priority following a disaster.
Debris management strategy for a large-scale debris removal operation divides the
operation into two phases.
. Phase I consists of the clearance of the debris that hinders immediate life saving actions
being taken within the disaster area and the clearance of that debris which poses an
immediate threat to public health and safety.
. Phase II operations consist of the removal and disposal of that debris which is
determined necessary to ensure the orderly recovery of the community and to eliminate
less immediate threats to public health and safety.
Emergency Roadway Debris Removal (Phase I)
o
. City personnel will identify critical routes that are essential to emergency operations.
. Roadway debris removal involves the opening of arterial roads and collector streets by
moving debris to the shoulder of the road. There is no attempt to physically remove or
dispose of the debris, only to clear key access routes to expedite the movement of
emergency vehicles, law enforcement, and critical services, as well as provide for
assessment of damage to key public facilities and utilities such as schools, hospitals, and
government buildings.
. The type of debris, as well as the priority to open access to other critical community
facilities shall be defined by City officials.
. The requirement for governmental services will be increased drastically following a
major natural disaster. Per contract requirements, TAG Grinding Services, Inc. will
provide necessary additional services including, but not limited to, water, temporary
power, temporary housing, temporary dry-in, blue roof services, etc.
Supervision and Special Considerations
. Immediate debris clearing (Phase I) actions will be supervised by appropriate City or
State officials, in conjunction with TAG management staff.
. All personnel will be required to adhere to all local, state, and federal safety rules and
regulations. All equipment will be equipped with proper safety equipment as per local,
state, and federal requirements.
Public Right-of-Ways (ROW) Debris Removal and Disposal (Phase II)
o
. Debris is simply pushed to the shoulders of the roadway during emergency opening
(Phase I) of key routes. There is little time or concern for sorting debris at that time.
The objective is to provide for the safe movement of emergency and support vehicles
into and out of the disaster area. As removal operations progress, the initial roadside
piles of debris become the. dumping location for additional yard waste and other storm-
generated debris, such as construction material, personal property, trash, white metals
o
such as refrigerators, washers, dryers and hot water heaters, roofing and even
household, commercial, and agricultural chemicals.
· City officials, along with TAG Grinding Services, Inc., will coordinate debris removal
operations.
· Field inspections supervisors will be established by TAG Grinding Services, Inc. to assist
in supervising the debris removal operations.
· Monitors for debris removal operations, who will be responsible for tickets and loading
and dumping sites, will be provided by the City.
· Daily update briefings will be held between key supervisory personnel of both TAG and
City officials. This will ensure that all major debris removal and disposal actions are
reviewed and approved City officials, as well as provide an opportunity to resolve any
coordination problems between State and Federal debris removal efforts and local debris
removal efforts and disposal efforts.
· Appropriate traffic control efforts will be taken to expedite debris removal activities while
ensuring the safety of those using the roadways.
· TAG will implement a proactive information plan. This plan will provide actions the
public can perform to expedite the cleanup process, such as separating burnable and
non-burnable debris; segregating HHW; placing debris at the curbside; keeping debris
piles away from fire hydrants and valves; reporting locations of illegal dump sites or
incidents of illegal dumping; and segregating recyclable materials. This plan will be
provide to the public through the use of local radio, television, and print.
. TAG will assist City officials in keeping the public informed of debris pick-up schedules,
disposal methods, and ongoing actions through the use of local radio, television, and
print. The following questions are likely to be asked:
What is the pick-up system?
When will the contractor be in my area?
Who are the contractors and how can I contact them?
Should I separate the different debris materials and how?
How do I handle Household Hazardous Waste?
What if I am elderly?
TAG will assist City officials in appropriate answers to questions based on FEMA
guidelines.
o
Private Property Debris Removal
o
· Dangerous structures should be the responsibility of the owner or the City to demolish
the health and safety of adjacent residents. However, experience has shown that
unsafe structures will remain because of the lack of insurance, absentee landlords, or
under-staffed and under-equipped local governments. Consequently, demolition of
these structures may become eligible for federal assistance. If that is the case, TAG will
provide equipment and personal necessary for demolition of approved structures and
disposal of debris from this demolition.
· The most significant building demolition problem will be that local governments do not
have proper ordinances in effect to handle emergency condemnation procedures. If
proper ordinances are in place, a copy of said ordinances should be made available to
TAG personnel.
· There is always the possibility that structures will be misidentified or have people or
belongings in them when demolition crews arrive. Therefore, it is imperative that City
officials work closely with TAG management personnel to ensure efficient and safe
demolition of properties. It is recommended that at least one FEMA representative be
on site to work directly with City officials to ensure that all required legal actions are
taken.
Household Hazardous Wastes Removal
....
o
. HHW may be generated as a result of a natural disaster. HHW may consist of common
household chemicals, propane tanks, oxygen bottles, batteries, and industrial and
agricultural chemicals. These items will be mixed into the debris stream and will require
close attention throughout the debris removal and disposal process.
. Salvageable hazardous materials will be collected and segregated based on their
intended use. Properly trained personnel, provided by Complete Environmental, will
accomplish removal of all hazardous waste. Cleanup actions will meet or exceed all
local, state, and federal regulations.
. HHW debris will be identified and removed prior to the building demolition. Personnel
provided by Complete Environmental will identify and remove all HHW.
. A separate staging area for HHW materials, contaminated soil, and contaminates debris
will be necessary and will be established at each TDSR site. The staging area will be
lined with an impermeable material and bermed to prevent contamination of the
groundwater and surrounding area. Materials will be removed and disposed of using
qualified HHW personnel provided by Complete Environmental in accordance with all
local, state, and federal regulations.
TEMPORARY DEBRIS STORAGE AND REDUCTION SITES
o
. Once the debris is removed from the damaged area, it will be taken to temporary debris
storage and reduction sites.
. Removal and debris actions will be handled expeditiously and safely. Equipment and
personnel will be provided per the magnitude of the event.
. SITE PREPARATION: The topography and soil conditions will be evaluated to determine
the best site layout. Ways to make the remediation and restoration easier will be
considered.
. SITE OPERATIONS: Site operation will be in accordance with FEMA guidelines, in
addition to local, state, and federal guidelines.
. Lined temporary storage areas for ash, HHW, fuels, and other materials that can
contaminate soil, surface water and groundwater will be established if necessary. If
possible, plastic liners will be used under stationary equipment such as generators and
mobile lighting plants.
. If the site is also an equipment staging area, fuel and equipment repair will be
monitored to prevent and mitigate spills such as petroleum products and hydraulic
fluids. Appropriate measures will be taken in the event of such spills.
. TAG Grinding Services, Inc. is constantly aware of things that might irritate neighbors of
the TDSR sites. Proper construction and operation of incineration pits will be necessary
to ensure low smoke. Water trucks will be employed to lower dust. Perimeter berms
will be constructed to lower noise. Proper layout of ingress and egress procedures will
be mandatory to help traffic flow.
DEBRIS REDUCTION METHODS
Volume Reduction by Incineration
The following are various incineration methods, which may be used if deemed preferable by City officials.
Although incineration methods can be used, TAG prefers grinding and chipping methods as the
preferable methods of debris reduction due to environmental recycling issues.
o
· There are several incineration methods available including uncontrolled open
incineration, controlled open incineration, air curtain incineration, and refractor line pit
incineration. TAG will work will City officials to implement the most appropriate method
if incineration is requested as part of the overall reduction strategy.
...
o
· Uncontrolled Open Incineration: Uncontrolled open incineration is the least
desirable method of volume reduction because it lacks environmental control. However,
in the haste to make progress, the Department of Natural Resources may issue waivers
to allow this method of reduction early in a disaster.
· Controlled Open Incineration: Controlled open incineration is a cost-effective
method for reducing clean woody debris in rural areas. This option must be terminated
if mixed debris such as treated lumber, poles, nails, bolts, tin, and aluminum sheeting
enters the waste flow. Clean woody tree debris presents little environmental damage
and the resulting ash can be used as a soil additive by the local agricultural community.
Department of Agriculture and county agricultural extension personnel should be
consulted to determine if and how the resulting ash can be recycled as a soil additive.
Responsible agencies and telephone numbers should be provided to TAG should City
officials choose this method.
· Air Curtain Pit Incineration: Air curtain pit incineration offers an effective means to
expedite the volume reduction process by substantially reducing the environmental
concerns caused by open incineration. Specifications and statements of work will be
developed to expedite the proper use of the systems and ensure the City if the
knowledge of air curtain incineration by TAG.
· Refractor Lined Pit Incineration: Pre-manufactured refractory lined pit burners are
an alternative to air curtain open pit incineration. The units can be erected on site in a
minimal amount of time. Some are portable and some are built in place. The units are
especially suited for location with high water tables, sandy soil, or where materials are
not available to build above ground pits. The engineered features designed into the
units allow for a reduction of approximately 95% with minimum air pollution. The air
curtain traps smoke and small particles and re-circulates them to enhance combustion
that reaches over 2,500 degrees Fahrenheit. Manufacturers claim that combustion rates
of about 25 tons per hour are achievable while still meeting emission standards.
. Local officials, environmental groups, and local citizens should be thoroughly briefed on
the type of incineration method being used, how the systems work, environmental
standards, health issues, and the risk associated with each type of incineration. A
proactive public information strategy to include press releases and media broadcasts
should be included in any operation that envisions incineration as a primary means of
volume reduction.
o
Environmental Controls
o
Environmental controls are essential for all incineration methods, and the following will be
considered:
· A setback of at least 1,000 feet will be maintained between the debris piles and the
incineration area. There will be at least 1,000 feet between the incineration area and
the nearest building. Fencing and warning signs will be used to keep public away from
the incineration area.
· The fire will be extinguished approximately two hours before anticipated removal of the
ash mound. The ash mound will be removed when it reaches 2 feet below the lip on the
incineration pit.
. The incineration area will be placed in an above ground or below ground pit, depending
on the site, that is no wider that 8 feet and between 9 and 14 feet deep.
· The incineration pits will be constructed with limestone and reinforced with earth
anchors or wire mesh to support the weight of the loaders. There will be a 1-foot
impervious layer of clay or limestone on the bottom of the pit to seal the ash from the
aquifier.
· The ends of the pit will be sealed with dirt or ash to a height of 4 feet.
· A 12-inch dirt seal will be placed on the lip of the incineration pit area to seal the blower
nozzle. The nozzle will be 3 to 6 inches from the end of the pit.
.....
o
. There will be one-foot high, unburnable warning stops along the edge of the pit's length
to prevent the loader from damaging the lip on the incineration pit.
. Hazardous or contaminated ignitable material will not be placed in the pit. This is to
prevent contained explosions.
· The airflow will hit the wall of the pit about 2 feet below the top edge of the pit, and the
debris will not break the path of airflow except during dumping.
. The pit will be no longer than the length of the blower system, and the pit will be loaded
uniformly along the length.
Volume Reduction by Grinding and Chipping
This is the preferred method of debris reduction for TAG Grinding Services, Inc. because it is generally
more affordable than incineration techniques and is more environmentally friendly.
o
. Hurricanes and tornadoes, as well as ice storms, may present the opportunity to employ
large-scale grinding and chipping operations as part of the overall debris volume
reduction strategy. Hurricanes can blow away scarce topsoil in the agricultural areas
and cause extensive tree damage and blow-down. This two-fold loss, combined with
the local climatic conditions, may present an excellent opportunity to reduce clean
woody debris into suitable mulch that can be used to replenish the topsoil and retain soil
moisture.
. Grinding and chipping woody debris is a viable method. It is more environmentally
friendly, and the resulting product, mulch, can be recycled. In some locations the mulch
will be a desirable product because of shallow topsoil conditions. In other locations it
may become a landfill product.
. Grinding and chipping woody debris reduces the large amounts of tree blow-down.
Chipping operations are suitable in urban areas where streets are narrow or in groves of
trees where it is cheaper to reduce the woody vegetation to mulch than to move it to a
central grinding site and then returning it to the affected area. This reduces the costs
associated with double handling.
. The DMTF will work closely with local environmental and agricultural groups to
determine if there is a market for mulch. Another source for disposal of ground woody
debris may be as an alternative fuel for industrial heating or for use in a cogeneration
plant.
· There are numerous makes and models of grinders and chippers on the market. TAG
Grinding Services, Inc. will work closely with City officials in determining the best grinder
application based on the usage of the resulting mulch.
. Chippers are ideal for use in residential areas, orchards, and groves. The number of
damage and uprooted trees presents a significant problem if they are pushed to the
rights-of-way for eventual pick-up and transport to staging and reduction sites. The
costs associated with chipping are reasonable because the material does not need to be
transported twice. This method is generally used when dealing with large volumes of
uprooted trees in one localized area. It is not cost effective if dealing with trees that are
scattered throughout a generalized area.
. Grinders are ideal for use at debris staging and reductions sites because of their high
volume reduction capacity. Locating the grinders is critical from a noise and safety
point-of-view. Moreover, there is a need for a large area to hold the woody debris and
an area to hold the resulting mulch. Ingress and egress routes to the site are also an
important consideration. TAG will provide a detailed layout of the staging and reduction
site to County officials prior to beginning operations. The layout will be based on the
evaluation of the site, as well as the surrounding area.
o
TDSR SITE CLOSE-OUT PROCEDURES
..
o
· Each TDSR site will eventually be emptied of all material and be restored to its previous
condition and use. TAG will remove and dispose of all mixed debris, construction and
demolition (C & D) debris, and debris residue to approved landfills. Quality assurance
inspectors will monitor all closeout and disposal activities to ensure contract compliance.
Additional measure required by local, state, and federal agencies will be adhered based
on the nature of the staging and reduction operation.
· All sites will be properly remediated. TAG will establish baseline data collection and
strict site operation procedures will be followed to ensure proper restoration.
· The basic closeout steps are to remove all debris from the site; conduct and
environmental audit or assessment; develop a remediation or restoration plan approved
by the appropriate environmental agency; execute the plan; get acceptance from the
landowner; and terminate lease payments, if applicable. The key to timely closeout of
the mission is the efficient scheduling of the above activities for multiple sites.
Therefore critical path scheduling of all activities as far in advance as possible will
minimize down time between steps.
. Environmental Restoration: Stockpiled debris will be a mix of woody vegetation,
construction materials, household items, and yard waste. HHW and medical waste will
be segregated and removed prior to stockpiling. Activities at the debris disposal site will
include anyone or a combination of the following activities: stockpiling, sorting,
recycling, incineration, grinding, and chipping. Incineration is done in air curtain pits
and generally only woody debris is incinerated; however, the efficiency of the
incineration and the quality of incineration material is highly variable. Contamination
may occur from petroleum spills at staging and reduction sites or runoff from the debris
piles, incineration sites, and ash piles.
· Site Remediation: During the debris removal process and after the material has been
removed from each debris site, environmental monitoring will be need to close each of
the sites. This is to ensure that no long-term environmental contamination is left on the
site. The monitoring should be done on three different media: ash, soil, and
groundwater.
· The monitoring of ash should consist of chemical testing to determine the suitability of
the material for land-filling.
· Monitoring of the soils should be by portable methods to determine if any of the soils
are contaminated by volatile hydrocarbons. TAG will do this if it determined that
hazardous material, such as oil or diesel fuel was spilled on the site. This phase of the
monitoring should be done after the stockpiles are removed from the site.
. The monitoring of the groundwater should be done on selected sites to determine the
probable effects of rainfall leaching through either the ash areas or the stockpile areas.
· TAG Grinding Services, Inc. considers the following requirements to closeout a
temporary staging and reduction site(s):
./' Coordinate with local, state, and federal officials regarding requirements and
support for implementation of a site remediation.
./' Establish a testing and monitoring program. TAG will be responsible for
environmental restoration of both public and leased sites. TAG will also remove
all debris from sites for final disposal at landfills prior to closure.
./' Reference appropriate and applicable environmental regulations.
./' Prioritize site closures.
./' Schedule closeout activities.
./' Determine separate protocols for air, water, and soil testing.
./' Develop cost estimates.
./' Develop decision criteria for certifying closure based on limited baseline
information.
./' Meet with approving authority to review and evaluate closure activities, progress,
and completion.
o
o
o
.
a
../ Retain staff during closeout phase to develop site-specific remediation, as
needed, based on the information obtained from the closure checklist.
ORGANIZATION AND RESPONSIBILITIES
Administration and Logistics
. TAG will provide all equipment and personnel necessary to complete restoration
processes in a timely and efficient manner. Equipment and personnel will be mobilized
within 24 hours of notification to proceed and will be sufficient in volume to handle
appropriate needs of the affected area.
. TAG will ensure that all processes will be done in an environmentally friendly manner to
the best of our ability.
. TAG will ensure that all processes will be done to minimize the impact on the
community, both residential and commercial.
. TAG will document all personnel and material resources used to comply with this
contract, as well as all processes taken to ensure restoration. Copies of all
documentation will be provided to appropriate City officials on a daily basis.
Documentation will be used to support any Federal assistance that may be requested or
required.
. TAG will comply with all rules and regulations of FEMA and all local, State, and Federal
agencies as they apply.
o
.~ .~
...., TAG....,
GRINDING SERVICES, INC.
The attached are copies of the following:
1) TAILGATE FENCING DETAIL - Describes in detail the appropriate truck tailgate
requirements.
2) TRUCK CERTIFICATION FORM - This form is completed when truck is registered
and measured. Copies of this form are distributed to appropriate personnel with one
copy staying with the truck at all times.
3) TRUCK PLACARD - This large sticker is placed on both sides of the truck after it is
registered for easily identifying the truck and truck capacity.
4) DEBRIS LOAD TICKET - This ticket, in five copies, is completed and disbursed to
the appropriate personnel. This ticket lists load quantities and provides easily
accessible information. We are currently in development of a program that will
enable us to use "smart cards" to electronically store and access truck and load
information, as requested by FEMA.
I)
o
o
o
o
I
--.~
(4)"::~~="./'
-..............................
/.-
''3\ /
\"./'
-~~.__..._. (1) :-....-.----......
,/
""
" t'-',
.- . --.- ,~.
/'
//
~T', Chainlink gate w/1-7i8" diameter It/elded tubular frame.
'.'./
;~2) Permanently attach \'lIgate hinges (minimum 3 locations).
/3'-. Gate must extend to bottom of truck bed.
'-" "/
<~....\ Secure gate with minimum of two 4" ratcheting tie-dovln straps
'-../
secured to side of truck bed.
TAILGATE FENCING DETAIL
-
o
o
o
Tag Grinding Services Inc.
Office: (770) 969-7980 ~o. 09 9 6
Fax: (770) 969-7988
Date
Truck #
Tag #
Driver's Name
City Name
Height
Length
Width
Total
Total Capacity _
,--
o
o
c
TRUCK
-NO.
CUBIC YARDS
,- - -- -
o
o
c
--
TAG GRINDING, INC. DEBRIS LOAD TICKET
Client Name: Disaster No: I TiCk2 2SbO 5
Truck Company
me:
I ruck Drive
Name:
Loading Loading
Date: Time:
Loading Location I Loading
(Street Address): Zone:
DEBRIS QUANTITY
Truck I Measured CY % I Actual CY
No: Capacity: Full: Load:
Tons:
Stump Classification
DEBRIS Classification ROW (Public property)
Vegetative Small (24"-36" diameter)
C+D Medium (37"-48"
White Goods Large (48" or greater diameter)
-
Other (state type)
Dumping Dumping
Date: Time:
Reduction/Disposal
Dumping Location:
Tag Representative Client Representative:
State Inspector (if applicable): Federal Inspector (if applicable):
r--~--- -
o
.... ..,.,
...., TAG ....,
GRINDING SERVICES, INC.
MANAGEMENT PLAN FOR EVENT TYPES
EVENT TYPE 1: SPOT JOBS - LOCALIZED
This type of scenario will require manpower and equipment primarily for the assistance
of the local governmental resources such as public work departments. We will provide
necessary crews of chainsaw operators, laborers, skid steers and operators, and hauling
equipment necessary to clear roads and remove debris. We have adequate manpower and
equipment to manage this size project without the assistance of subcontractors.
Debris from this type of event is typically woody in nature and smaller in volume.
Therefore, a TDSRS is not necessary as such facilities are, under FEMA guidelines, only needed
in major disasters and where there are not sufficient landfills available to handle debris in a
timely manner. City/County landfills are typically sufficient to handle the smaller amount of
debris although it would be required to be segregated from other debris at the landfill for
monitoring and reimbursement purposes.
o
This type of scenario can be handled efficiently with 1-4 crews of 2-4 men with saws
and equipment. Hauling can be accomplished with 1-2 trucks per crew. Trucks will be self-
loading 30-40 cubic yard dump trucks. Supervisory personnel will be at a minimum with one
project manager who would manage the entire project. Paperwork will be handled by the
project manager and will include time sheets to provide hours provided by personnel and
equipment. This size event would qualify to be managed under the FEMA Public Assistance
Pilot Program. More information on this program can be obtained by contacting us.
An example of our response to this type of project would be our recent assistance to the
City of Atlanta after damage caused by a tornado. We assisted the City in managing debris
collected by City personnel, ground and hauled off the debris, assisted the City in filing
appropriate paperwork with FEMA, and assisted with negotiations with FEMA in order to receive
reimbursement.
EVENT TYPE 2: SMALL EVENT - WIDESPREAD OR CITY/COUNTY WIDE
o
This type of scenario, although small in nature, will require more personnel and
equipment due to its widespread nature. Depending on the size of the city/county landfill, a
TDSRS still may not be necessary. If a site is required, it will be small in size and will be used
for a short period as a temporary storage site only, allowing for the segregation of debris if
debris other than vegetation is present. No specialized reduction, such as burning, would be
required although grinding of vegetative debris may be requested. We are familiar with the fact
that FEMA is subject to the Resource Conservation & Recovery Act (RCRA) that requires safe
disposal of all waste materials, encourages cooperation with local authorities and promotes
recycling of waste materials. The TDSRS will be reclaimed at the conclusion of work as
regulated by FEMA, Regulation # 325. We will follow site closure procedures; realizing site
closure is an important portion of the debris mission and should not be overlooked. We will
follow these guidelines, insuring that: 1) that all operations are complete and the site has been
-
cleared and cleaned of all debris, 2) current environmental data on soil and water will be
compare to baseline data taken before the site was activated, 3) and insure that the site is
restored to its prior condition.
o This type of scenario can be handled with 6-10 crews of 1-2 men with saws and
equipment. Hauling can be accomplished with 1-2 trucks per crew. Trucks will be self-loading
30-40 cubic yard dump trucks. Supervisory personnel will be at a minimum with one project
manager and possibly one superintendent for the entire project. Necessary paperwork,
including load tickets and daily reports, will be managed and provided by supervisory personnel.
This size event would qualify to be managed under the FEMA Public Assistance Pilot Program.
More information on this program can be obtained by contacting us. We have adequate
manpower and equipment to manage this size project without the assistance of subcontractors.
An example of our response to the type of event would be our assistance to Cheneyville,
North Carolina in response to damage from an ice storm where we assisted City personnel in
the removal of eligible debris from the public ROW, as well as the filing of necessary paperwork
with FEMA to receive reimbursement.
EVENT TYPE 3: SIGNIFICANT EVENT - REMOVAL, REDUCTION, HAULING -
WOODY DEBRIS ONLY - WIDESPREAD OR CITY/COUNTY WIDE
o
This type of event will not only require more personnel and equipment, but will also
mandate the establishment of a TDSRS. The mSRS will be established per requirements and
regulations of FEMA and will be in an area pre-established or agreed upon by City personnel.
Vegetative debris will be ground or burned per requirement of City personnel and hauled off of
the TDSRS to a location approved by FEMA. In past performances, we have established many
TDSRSs following FEMA requirements & regulations by insuring that each site has: 1) ingress
and egress routes that allow for good traffic flow, 2) inspection towers that allow close
inspection of trucks, 3) clearly-defined segregation areas, 4) clearly identified reduction sites, 4)
a completed baseline environmental study on hand. Additional manpower and equipment
necessary to manage the TDSRS will be provided. The TDSRS will be reclaimed at the
conclusion of work as regulated by FEMA, Regulation # 325. We will follow site closure
procedures; realizing site closure is an important portion of the debris mission and should not
be overlooked. We will follow these guidelines, insuring that: 1) that all operations are
complete and the site has been cleared and cleaned of all debris, 2) current environmental data
on soil and water will be compare to baseline data taken before the site was activated, 3) and
insure that the site is restored to its prior condition.
o
Initial response will include a plan to divide the affected area into quadrants that will be
managed by one superintendent per quadrant. Supervisory personnel will also include one
project manager and, if required, one safety manager. Each quadrant established will be
assigned 6-8 crews initially with the addition of more crews if necessary. Crews will be 1-2
laborers with saws, one skid steer/loader with operator, and traffic personnel. Hauling will be
accomplished with 3-5 trucks per crew. Trucks will include self-loading 30-40 cubic yard dump
trucks, and 30-40 cubic yard dump trucks. Furthermore, if assistance is required to aid the City
in the removal of leaning and hanging hazardous trees and limbs, as well as the removal of
hazardous stumps, crews including bucket trucks and excavators will be provided. Necessary
paperwork, including load tickets and daily reports, will be managed and provided by
supervisory personnel. We have adequate manpower and equipment to manage this size
project with little or no assistance from subcontractors.
An example of our response to this type of event is our assistance to Manning, South
Carolina in response to damage from an ice storm where we assisted City personnel in the
--
removal of eligible debris from the public ROW, trimming damaged limbs and broken trees,
managing the TDSRS to include reduction and disposal of debris, as well as assisting the City
with the filing of necessary paperwork with FEMA to receive reimbursement.
o EVENT TYPE 4: SIGNIFICANT EVENT - REMOVAL, REDUCTION, HAULING,
AND SEPERATING - MIXED DEBRIS - WIDESPREAD OR CITY/COUNTY WIDE
This type of event will require the same response as Event Type 3, but with the addition
of areas at the TDSRS necessary to segregate and store separated debris, as well as additional
personnel and equipment to manage the removal, separating, hauling, and reduction of the
segregated debris. Any debris eligible for recycling will be hauled to appropriate recycling
facilities. Vegetative debris will be ground or burned per requirements of the City and reduced
debris will be hauled to a location approved by FEMA. The TDSRS will be reclaimed at the
conclusion of work as regulated by FEMA, Regulation # 325. We will follow site closure
procedures; realizing site closure is an important portion of the debris mission and should not
be overlooked. We will follow these guidelines, insuring that: 1) that all operations are
complete and the site has been cleared and cleaned of all debris, 2) current environmental data
on soil and water will be compare to baseline data taken before the site was activated, 3) and
insure that the site is restored to its prior condition.
Furthermore, additional crews trained in the handling of hazardous materials may be
required and would be provided if necessary. Hazardous materials will be staged in an area
provided at the TDSRS as required and regulated by FEMA and would be disposed of in a
manner so as to adhere to all federal rules and regulations, including those of FEMA. We have
adequate manpower and equipment to manage the majority of this size project but would
require the assistance of our subcontractor for the handling of hazardous materials.
o
An example of our response to this type of event is our assistance to Cape Coral, Florida
in response to damage from Hurricane Wilma where we assisted City personnel in the removal
of eligible debris from the public ROW, trimming damaged limbs and broken trees, managing
the TDSRS to include reduction and disposal of debris. Furthermore, we removed debris from
canals and waterways, and assisted the City with the filing of necessary paperwork with FEMA
to receive reimbursement.
EVENT TYPE 5: CATASTROPHIC EVENT - REMOVAL, REDUCTION, HAULING,
AND SEPERATING - MIXED DEBRIS - WIDESPREAD OR CITY/COUNTY WIDE
Although this type of event is larger in nature, it will be handled in much the same way
as Event Type 4. Primary differences will be the amount of crews and supervisory and support
personnel, as well as the addition of multiple TDSRS. Quadrants will be initially assigned to 10-
12 crews per quadrant with additional crews added as necessary. Hauling equipment will be
increased to include 100 cubic yard trucks. Supervisory personnel will include the addition of a
safety manager, quality control manager, and documentation manager, as well as support
personnel for each assignment and additional personnel to manage and maintain the additional
TDSRS(s). All TDSRS will be reclaimed at the conclusion of work. Although we have adequate
manpower and equipment to manage a large portion of this size project, assistance from
subcontractors will be necessary. Please refer to our subcontractor policy for more information.
o
An example of our response to this type of event is our assistance to Cape Coral, Florida
in response to damage from Hurricane Charlie where we assisted City personnel in the removal
of eligible debris from the public ROW, trimming damaged limbs and broken trees, managing
the TDSRS to include reduction and disposal of debris. Furthermore, we removed debris from
canals and waterways, and assisted the City with the filing of necessary paperwork with FEMA
to receive reimbursement. Although we were not the primary contractor on this project, our
superior work and management ultimately led to the award of the pre-event contract for Cape
Coral.
Q EVENT TYPE 6: CATASTROPHIC EVENT - SITE MANAGEMENT - CITY/COUNTY
WIDE
This type of event will be managed in much the same way as Event Type 5 but with the
inclusion of additional services. Such services will include temporary power, temporary housing,
water, and ice services, if necessary. Furthermore, additional crews, equipment, and
supervisory and support personnel will be provided as necessary. Although we have adequate
manpower and equipment to manage a large portion of this size project, assistance from
subcontractors will ~e necessary. Please refer to our subcontractor policy for more information.
An example of our response to this type of event is our assistance to Ft. Walton Beach,
Florida in response to damage from Hurricane Charlie where we assisted City personnel in the
removal of eligible debris from the public ROW, trimming damaged limbs and broken trees,
managing the TDSRS to include reduction and disposal of debris. Furthermore, we assisted the
City with the filing of necessary paperwork with FEMA to receive reimbursement. Although we
were not initially the primary contractor on this project, we were called by the City to respond
when the primary contractor failed to do so. We moved in to the area approximately 3:00 a.m.,
were assisted by local police in confiscating a hotel for temporary housing and office area, and
began work by 10:00 a.m. that same morning.
SUMMARY
o
All events, regardless of size or nature, adversely affect life for local citizens and it is our
mission to provide quality, efficient, and timely response to your City. We provide yearly
training sessions, which include the most current information available from FEMA regarding
public assistance rules and regulations. Furthermore, this meeting allows us the opportunity to
formulate a personalized plan for responding to disasters to your area, including the assignment
of personnel responsible for the various areas of disaster response. Additionally, TAG has on its
staff two former employees that are well versed and experienced with site management and
FEMA requirements, rules, and regulations that will be able to assist the City in the more
technical issues resulting from a disaster event.
For more detailed information or our generalized response to disasters, please refer to
the "Management Plan for the Project" or "Understanding of Project Requirements" sections of
the attached information or contact our office.
Q
o
..,., ..,.,
...., TAG ....,
GRINDING SERVICES, INC.
SUBCONTRACTING POLICY
It is the policy of TAG Grinding Services, Inc. that all Subcontracting agreements shall include
the standard contracting language or at least the following:
o
1. All work to be performed shall commence within 24 hours of notification.
2. TAG Grinding Services, Inc. will give local subcontractors preference for employment
during disaster recovery projects.
3. In the event a subcontractor fails to start the project within 24 hours or is unable to
supply adequate personnel or materials to the satisfaction of the contracting entity or
TAG Grinding Services, Inc., then TAG Grinding Services, Inc. may terminate the
contract.
4. TAG Grinding Services, Inc. will pay the subcontractor weekly on Friday for all work
performed the week prior. A retainage of 10% will be withheld until completion of the
project and release of all funds to TAG Grinding Services, Inc.
5. Prior to beginning work on the project, all subcontractors will provide the required
insurance from a responsible insurer and provide proof to TAG Grinding Services, Inc.
6. All applicable State, Federal, and Local Safety Regulations are to be observed and
enforced by subcontractor at all times. Failure to do so could result in termination of the
contract.
7. Subcontractor shall not assign the Subcontract without written permission from TAG
Grinding Services, Inc.
8. Subcontractor will provide periodic progress reports to TAG Grinding Services, Inc. as
mutually agreed..
9. Subcontractor shall pay for all materials, equipment, and labor used in, or in connection
with, the performance of this Subcontract.
10. Subcontractor shall give all notices and comply with all Federal, State, and Local tax
laws, social security acts, unemployment compensation acts, and workers' compensation
acts. insofar as applicable to the performance of this Subcontract.
11. Subcontractor shall take all reasonable safety precautions and comply with all safety
measures in accordance with all applicable laws, ordinances, rules, and orders of any
public authority.
12. Subcontractor shall promptly notify TAG Grinding Services, Inc. of all claims for
additional cost, extensions of time, damages for delays or other causes in accordance
with Subcontract Agreement.
13. Subcontractor shall indemnify and hold harmless Owner, Architect/Engineer and TAG
Grinding Services, Inc. and all their agents and employees from and against all claims,
damages, losses, and expenses including, but not limited to, attorney's fees arising out
of or resulting from the performance of Subcontractor's work under this Subcontract, to
the fullest extent permitted by law.
14. Subcontractor will be responsible for all damages he causes to private or public
properties.
o
c
o
o
- -
-
TAB 4
. Bid Documents
. Required Submittals
Q
SECTION 7
PROPOSAL RESPONSE SHEET I QUALIFICATIONS I FEE SCHEDULE FORM
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
RFP No. 08-07-01 for Emergency Debris Clearing and Removal Operations
The undersigned Proposer proposes and agrees, if this RFP is accepted, to enter into an agreement with The City of
Sunny Isles Beach in the fonn included in the Contract Documents to perfonn and furnish all Work as specified or
indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this RFP and in
accordance with the other tenns and conditions of the Contract Documents.
7.1. The Proposer accepts all of the tenns and conditions of the Advertisement or RFP and Instructions to
Proposers, including without Iimttation those dealing with the disposition of Bid Security. This proposal will remain
subject to acceptance for 90 days after the day of proposal opening. The Proposer agrees to sign and submit the
Agreement with the Bonds and other documents required by the RFP Requirements within ten (10) days after the
date of the City's Notice of Award.
o
7.2. In submitting this proposal, the Proposer represents, as more fully set forth in the Agreement, that:
7.2.1. Proposer has examined copies of all the Proposal Documents and of the following Addenda (receipt of all
which is hereby acknowledged.)
Addendum No. Dated:
Addendum No. Dated:
Addendum No. Dated:
Addendum No. Dated:
7.2.2. The Proposer has familiarized himself/herself with the nature and extent of the Contract Documents, Work,
site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress,
perfonnance, or furnishing of the Work.
7.2.3. The Proposer has studied carefully all reports and drawings of subsurface conditions and drawings of
physical conditions if applicable.
7.2.4.
The Proposer has obtained and carefully studied (or assumes responsibility for obtaining and carefully
studying) all such examinations, investigations, explorations, tests and studies that pertain to the subsurface
or physical conditions at the site or otherwise may affect the cost, progress, performance, or furnishing of
the Work at the Contract Price, within the Contract Time and in accordance with the other terms and
conditions of the Contract Documents, and no additional examinations, investigations, explorations, tests,
reports or similar information or data are or will be required by Proposer for such purposes.
7.2.5.
Proposer has reviewed and checked all information and data shown or indicated on the Contract
Documents with respect to existing above ground and underground utilities at or continuous to the site and
assumes responsibility for the accurate location of said above ground and underground utilities. No
additional examinations, investigations, explorations, tests, report or similar information or data in respect of
said above ground or underground utilities are or will be required by Proposer in order to perform and
furnish the Work at the Contract Price, within the Contract Time and in accordance with other terms and
conditions of the Contract Documents.
Q
37
.-
c
7.2.6. The Proposer has correlated the results of all such observations, examinations, investigations, explorations,
tests, reports, and studies with the terms and conditions of the Contract Documents.
7.2.7. The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in
the Contract Documents and the written resolution thereof by City is acceptable to the Proposer.
7.2.8. This proposal is genuine and not made in the interest of or on behalf of any undisclosed person, firm or
corporation and is not submitted in conformity with any agreement or rules of any group, association,
organization, or corporation. The Proposer has not directly or indirectly induced or solicited any other
Proposer to submit a false or sham proposal; the Proposer has not solictted or induced any person, firm or
corporation to refrain from proposing; and Proposer has not sought by collusion to obtain for itself any
advantage over any other Proposer or over the City.
7.3. The Proposer understands and agrees that the proposal is for time and material and untt prices to clear and
remove debris generated by a hurricane, tomado, or other natural or man-made debris generating event. Estimates
are provided for the purposes of Proposal Evaluation and to establish unit prices for individual Work Items to be
contracted by the City under individual Task Orders, based on the time and material and/or unit prices established
under this proposal. The City and the successful Proposer will establish completion times for each individual Task
Order and the successful Proposer agrees that the work will be completed within the time frames agreed upon and
stipulated in the individual Task Orders and/or Notice to Proceed.
o
Communications conceming this Proposal shall be addressed to:
Proposer N~me: f~(~ (1Y"'xl,~ EiYvices, Lnc.
Address: P -0. __ 26, IlP _ 2. tWtLlU.. e t,l
"'f.Al \Ii &0 n I ~ :~lD '2. ~ V;
Telephone 25lP ~ ~ ~. '2:2.- \f- ~
Fax 25Ct - 3'15- ') 2..(p "1
Attention: Jer~~ W. 'E.>roo k~
7.5. The terms used in this proposal which are defined in the General Conditions of the Contract included as part
of the Contract documents have the meanings assigned to them in the General Conditions.
7.4.
7.6. QUAUFICAnON
7 At Contractors will be evaluated for this project based on a two-step process.
Step I. Contractors must demonstrate that they satisfy Mandatory Qualification as outlined in Section 3, Section 4
and Section 9. All proposals will be screened for compliance with mandatory qualification elements, such as
the required statements of compliance. Those that satisfactorily complete that screening process will proceed
to Step II.
Step II. Contractors will be evaluated in accordance wtth the criteria set forth in Section 62.8 of the City
Code. The contract will be awarded by the City to the lowest responsible and responsive proposer who
proposal best serves the interests of, and represents the best value to, the City pursuant to the criteria set
forth in Section 62-8 of the City Code. Price is only a factor in determining the lowest responSible and
responsive proposer.
7 Ji2. General
The City of Sunny Isles Beach intends to enter into a pre-positioned contract with at least one prime
Contractor who may utilize both local and non-local resources to provide services in the event of activation by
the City following a hurricane, tomado or other natural or man-made disaster. The period of the contract will be
~
38
c
for three (3) years with two (2) one (1) year options for a total of five (5) years with an annual re-
certification and price adjustment based on 80% of the Consumer Price Index for the Greater Miami-Dade
County Area.
The project consists of post-disaster debris management within the City Iim~s in two parts.
· Part 1 is "Debris Clearance (for access) from Public Rights-of-way and Public Property," consisting of only
pushing debris from the traveled way of city streets and public facilities to open one lane for emergency
vehicles. This work will be perfonned on a Time and Material price bases limited to no more than 70 hours
of actual work.
· Part 2 is "Debris Removal Operations," consisting of IoacfD1g and hauling debris from pubrlC rig,ts-of-way to an
approved landfill. This work wiD be perfonned on a Unit Price bases documented by valid load tickets.
When identifying resources to be made available under this contract, Contractor shall use a planning standard
approach. Specifically, Contractor must identify the expected sources and quantities/numbers of equipment and
personnel that will be engaged. Contractor must identify sufficient resources to ensure the avaJlabirrty of personnel
and equipment as necessary to initiate all required activities within 24 hours of being so directed and any additional
resources that might be necessary to have all required actions completed within the time frames specified
herein. For the purpose of identification of Contractor/Subcontractors a general equipmentipersonnel
inventory will suffice. For Subcontractors, a statement of their commitment to provide resources for this project must
be included in the submittaJ. The planning standard to be used is removal and disposal of approximately 40,000
cubic yards of mixed debris within a prescribed operating period of not more than 30 days.
7.7. SEE SECTION 3, INSTRUCTIONS TO PROPOSER FOR PROPOSAL PROCESS, SECTION 4,
GENERAL PROVISIONS, and SECTION 9, PROPOSER QUALIRER STATEMENT
7.8. EVALUATION OF PROPOSALS
7.8.1. Potential Contractors will be evaluated for the project based on evidence and statements of
compliance/intent provided in their Proposals. First, the City will determine which Contractors are capable of
entering into a contract with the City by satisfying Mandatory Qualification and as outlined in Section 3, Section 4,
and Section 9 thus making them eligible for consideration. Then, the City will detennine which eligible
Contractors satisfy the Project Requirements, thus deeming them qualified for the project. Only qualified
Contractors will move on to the second stage of the evaluation, Le. consideration of their Project Approach and
Fee Proposals for the services described by this RFP package.
7.&2. The City reserves the right to deny consideration to any Contractor that does not satisfy the Mandatory
Qualification Criteria or is not capable of satisfying the Project Requirements. However, the City may waive defects,
irregularities or infonna/ities in the qualification process or in any response to the process that, in the City's
opinion, seems advantageous to the City and in the best interest of the public.
o
Q
39
c
7.9.6.
7S,7
'0
I
I
7.10.
7.10.1.
7.1Q2.
7.1Q.3.
o
7.9.
7S,1.
STANDARD SPECIRCAll0NS FOR DEBRIS REMOVAL
Scope of Work: Work consists of hurricane, tomado or major disaster debris clearing and removal from plillic
property and the public rights-of-way within the City limits and proper disposal of the debris. The work consists of
loading and hauling debris from public rights-of-way to an approved landfill.
Preparedness: Key personnel, proposed by the Contractor under the pre-quaification process, must participate in
the City's annual disaster preparedness training activities, a maximum of two (2) days each year at no cost
to the City.
Prepositioning: Upon activation of the contract, contractor must provide a two-person management team
on-site within 12 hours of receipt of the Notice to Proceed. The purpose is to initiate actions necessary to
ensure that contractor resources will be able to begin recovery operations within 24 hours of receiving the Notice
to Proceed from the City.
Inspection of Debris: As soon as possible after the disaster event has subsided, the Contractor must make a
detailed and thorough on-site inspection of debris to be removed, and consider (1) amounts and types of
debris; (2) working conditions such as traffic, streeVroad width, and land use; (3) means to ingress and
egress to work areas; and (4) all other factors affecting the removal and disposal work.
Coordination: Debris removal is limited to that which is detennined by the City Debris Manager to be in the best
public interest and that which is considered essential to the economic recovery of the affected area. The City
Debris Manager will determine priorities for debris removal. The Contractor must coordinate closely with and take
direction from the City Debris Manager. The Contractor must coorcinate with other contractors and other public
and private entities also performing recovery operations.
City Limits: Work is limited to specified areas within the City of Sunny Isles Beach.
Quality Assurance: Work will be closely monitored by City personnel, and/or its desiglee. The Contractor
must cooperate with all monitors representing the City and the Federal Emergency Management AfPlCY (FEMA).
DEBRIS REMOVAL
General: The goal of the debris removal work is to clear, load, and haul debris from public property and the public
rights-of-way to an approved landfill. In general, but not exclusively, this consists of curbside debris removal on
City property. The types of debris to be removed include, but are not limited to trees, wcxxfy debris, brush, building
wreckage, construction and demolition debris (C&D), and personal property and household goods on public property
or in public rights-of-way. Hazardous materials are not covered by this scope of work.
Preparatlon/Submlttal: Prior to commencing any removal work, the beds of all hauling vehides must be
measured to determine their fully loaded capacities. All measurements must be made by a joint City or its
designee/Contractor team. The vehides must be marked extemaUy with the owner/operato~s name, the contract
number, vehicle 10 number and the fully loaded capacity. Those markings must be clearly visible on both sides of
the vehicle. Those markings must be placed on both sides and the front wall of the bed. Markings must be
certified by the City or its designee and Contractor. A rlSt of all vehicles, with the owner/operator's name, vehide 10
number and hauling capacity must be submitted to the City Debris Manager before the vehicles are placed in
service. The City will provide five (5) part load tickets for each vehicle at each debris loading site. The load
tickets must be presented to the City's monitor at the designated disposal site.
Hazardous Materials: Hazardous and toxic wastes will be loaded, hauled, and disposed of by others and are
excluded from this work. The City may execute a separate hazardous materials removal and disposal contract;
however, collection schedules may not necessarily coincide with the debris removal work. Hazardous materials
include chemicals, petroleum products, paint products, asbestos, power transformers, oxygen bottles,
propane tanks, batteries, industrial and agricultural chemicals, cleaning agents and similar hazardous,
dangerous or toxic materials. Some preliminary curbside separation will be attempted, but contractor must be
aware that hazardous materials might be commingled with debris. Contractor shall take every precaution to
avoid loading and hauling hazardous materials. Notwithstanding, contractor forces must be aware of the
7~
7.9.3.
7.9A.
7.9.5.
40
-
Q
appropriate safety precautions. Further, Contractor will be responsible for safe and proper handing of any
hazardous materials inadvertently loaded by contractor forces. Contractor forces must notify the City Debris
Manager of locations where hazardous materials are ercountered.
7.1OA. Other Non-Collection Items: The following items must not be removed or hauled to the designated disposal
sites:
· Household putrescible garbage
· Electric company transfonners, poles and other equipment and materials
· Telephone company transfonners, poles and other equipment and materials
· Traffic signs, signals, and appurtenances
· Debris on private property
· Vehicles, boats and trailers
· Household Hazardous Waste
Curbside coIection of household putrescllle garbage will be handled by the usual public and private haulers.
Household garbage must not be mixed with stonn debris. All utility equipment, traffic signs and signals that are
encountered must be moved to a visible, accessible location at or near curbside for disposition by utitity
companies or the City.
Privately owned vehicles may not be moved by the Contractor. The Contractor will advise the City Debris
Manager accordingly when removal of vehicles is necessary to continue debris removal operations.
7.10.5. Debris Removal: During debris removal operations, extreme caution must be exercised by the Contractor to
ensure that no damage is done to publiC or private properties. Tracked vehicles may not be operated on paved
surfaces.
7.1Q6. Loading: All loose debris, such as tree limbs, must be reasonably compacted on the hauUng vehicles during
loading. All debris extending beyond the vehicle in any horizontal direction must be cut off or otherwise removed.
7.10.7. Hauling: All vehicles utilized in hauling debris must be equipped with adequate means for containing the load,
including canvas covering while transporting the debris to the landfill. Covering must effectively prevent debris from
being blown or bounced off the vehicles.
Sideboards or other extensions to the bed will be permitted provided they meet state and local requirements,
cover front, back, and two sides, and are substantially constnx:ted. Sideboards must be constructed of 2" x 6" lumber
or greater and may extend no more than two (2) feet beyond the metal bed sides. Vehicles must be equipped with a
tailgate or other devices that will effectively contain the debris on the vehicle while hauling, and also perm~ the
vehicle to be loaded to capacity.
7.10.8. Dumping: All debris must be hauled to an approved landfill. The Contractor must make ~ery effort possible to
separate trees, woody debris, and brush from other types of debris at curbside. All trees, woody debris, and
brush will be accepted at the designated landfill. Construction and demolition debris must be similarly
segregated and transported.
7.10.9. Equipment Storage: The Contractor is responsible for locating areas where hislher equipment may be stored,
serviced and repaired and coordinating with the City if said location Is in the City limits. Such areas must not be
located w~hin rights-of-way or in any areas that would impact traffic flow or produce a safety hazard. This does
not preclude par1<ing equipment for short periods of time, including overnight, in right-d-way areas where work is in
progress; on-site refueling and operating checks including daily maintenance will be allowed.
o
o
41
-
o
7.11. SCHEDULE
7.11.1. Removal Operations: Must begin within 24 hours of receiving the Notice-to-Proceed and be functioning at 100% of
capacity within 2 days. Removal may begin earlier if adequate disposal sites are available and properly
prepared. The City reserves the right to increase or decrease the scope of the removal activity as he/she deems
necessary to ensure effective management of the overall debris removaVdisposal operations.
7.11.2. Working Hours: Unless otherwise pennitted by the City, working hours for removal operations shall be limited
to daylight hours.
7.12. EXTRA WORK
At the City's option, the scope of work may be expanded to include Federal Aid System roadwyays, public parks, other
recreational areas, drainage structures, and channels.
7.13. UNIT PRICE PER CUBIC YARD OR TON BASIS OF MEASUREMENT AND PAYMENT
7.13.1. Debris removal will be paid for on the basis of a unit price per cubic yard or by the ton for all debris loaded.
hauled, and dumped at an approved landfill. The unit price per cubic yard or ton must include all subsidiary costs,
including but not limited to labor, equipment, fuel, maintenance, general administration, and overhead and profit.
Compensation will be based solely on the volume of debris hauled as dcx:umented by oompleted load tickets
administered and validated by City monitors.
7.13.2. The following conversion factors will be used to convert from cubic yards to tons unless material is weighed at
certified scales, in which case, the net weight of the materials shall prevail:
· Mixed Debris - Vegetation and Construction & Demolition = 500 LBSlCY or CY x 0.25 = Tons
· Yard Vegetation - SoftWood = 333.33 LBS/CY or CY x 0.167 = Tons
· Yard Vegetation - Hard Wood = 500 LBS/CY or CY x 0.25 = Tons
· Construction & Demolition = 1000 LBS/CY or CY x 0.5 = Tons
· Mulch = 1000 LBS/Cy or CY x 0.5 = Tons
· Regular Trash = 300 LBS/CY or CY x 0.15 = Tons
· Concrete = 2000 LBS/CY or CY x 1.0 = Tons
· Sand = 2600 LBS/CY or CY x 1.3 = Tons
10
c.
42
c
o
.
tn
Z
o
~
IX
W
a..
o
....I
~
:E:E
a:~_
~C~
~~~
;:),,~
Cz .
w-o
:x:a:z
Uc(Q.
cnwlL.
w....la:
wU
IL.tn
a:
CD
w
Q
>-
U
Z
W
"
IX
W
:E
w
::i
IX
f(
W
....I
;:)
CI
W
:x:
U
tn
W
W
IL.
~
.....
,..:
rn
'C
~
CP
"1:J
11
>C
E
'0
r!
~
I
,..:
"1:J
C
ca
rn
'C
~
CD
"1:J
1
'E
'0
'G
>-
u
:a
:J
u
o
o
o
g
...
.e
0)
c
'0
'C
Q.
:t::
C
;:)
I
c(
~
~
I
~
c
o
'r;;
~
(J
':J
o
o
o
-
o
~
Pt;:.
8
'C
Q.
-
'2
;:)
:t::
C
;:)
.:r=
1:
!
o
~
t""""
>-
~
>-
u
en
Z
o
I-
rs
a
o
o
LD'"
~
-.
-
~
o
o
t;
.@
0.0.
8~
~~
.~
~
{J
o
(J
"0
:[ :[
.0 .0.
8~ ~~
~"g r-:~
.~ ,~
~ ~
8
o
a
a
o
....
a
g
8
~
-
~
o
en
Z
o
I-
:[
.0.
OQ)
00
C!.-o
"-Q)
,~
~
cD "5 .......:.. dl Co
>-01: Q) <'lI:3 Q) c;
<'lIO ~ ~= = -<'lIo'"
3: -;:: i -g E 7ii ]I <<i .! .a3
"O~ -0 <'lI~ -0 .8-8:5-0:5
w<'ll Q) ~:c Q) E we-
Ew -~ 3:chl: <<i ::;~~iil~
C)Q) w lI)l:-<'lI!l...
a:'E "0.2. I: ::I<'lI'OQ)iO
2i w >-0 8. 0 0._ E
~~ E ~~ E -e~n~a;lii
11)::1- 8 .- <'lI 8 l!I_ _:5
ell.... a::w !iiw"gQ)Q)
0-00 ~ -OQ) ~ ::C~uE~
=) Q) 0 .E- Q) = 'E- '0 :!2 <'lIQ.~ E
,I: ~ .1: E e 21 ~
~~ 0 ~~ 0 <'lIQ)E,I:~
O~~ = ~o = ;Q)8:3~
- ELf :;: E;: :;: E=EiiCii
1...- w ...~ w .ao~l:::)
aO~'i'~ 0.;::. ~ Cl)Q).;::.'-E
a .f;' 0 J2 >< .f;' = >< - w._ ~ w
- Q.Q)Q) ,- CD oR> 0.
is 2i.sa.o. I: 2i ~ I: 1 !if ~ lii E
"'a eO.......; eu....- ~-..c:: ~
ell.-Ow~....:ll.Cii :3....:. -02::00
lIIl!iO!.lBI-'_C\iofg ="" I:~Q).
Cii :c <'lI 0 E ....; :is 0._ E ....; .m <'lI Q) ~-
~ ::I .~Z ~ E ::I ,sa ~ ~ E c ~ = .!!! -g
1;;1l.:3Q)~Q)1l.0Q):CQ)1!00-o5
iPE-oc'8d>=E-o.o.d>=<'lIEClliio
IXe<'ll-~~e~~~~Ciie~-oQ)~
-! ';;.g ui-i ~ ';;. I: I:!:! ~"g ~ "":ij:.lB:5
.0 ~ :; ~' 15 ~ .~ 0 :t: -g Ii ~ ~ 8 E ~
!IIo<'ll.- ::IoQ)z:C ~<'lI"'olS.
c a: ~ E 8. (7 a: -0 Q) 8. (7 IX w.o. ~.::: ~
O_-o~~.lBN<'lIQ)~.O_-O_~=
_....;lii~c~....;S~C~NNliig~~
c
o
:s.
'C
u
rn
j
000 ()
Qa'O ~
GO\{)
g ~~ (g
~ ~I::: ~
~~ fS 1)
(lOO ()
~ -:> ~ -:>
ooln cO
~~~ -
iiiiiiii
~~~~
~{;J{;JUJ
Q) Q) Q) Q)
e ~ e ~
1-1-1-1-
OLOLOO
~"-C\ILO
C\I
.i -= lii
~~ :5
~~ ~
o..c m
~~ C;,
~I- ,g
3:~ ~
"O~ g'
S en -en
~.= I:
~~ ~
.!iO! R ~
~caGi"" 0
::)C\I-.lB .....
ll. .Q)Q)"'!;;
~EEQ)'V
"i~,!!l <'lI ~ :tI
.1: S. -0 '6 !ij ~
.s e ii -fi .- '0
.6i :5 .6i E ~ Cii
E"":~m ~fg
O)~ . ~ (ij ~
~E~~:C'6...:
cas.sga"C~
"g-::ii-fiiiliiE
~{l.1: E I:g!.!!l
~9~~~~~
~~ ~ :3
_Q) C\fii
en .0 N .1:
.-
M
~
o
()
C '0
0 .
! 0
~ 0
w a
....
c
<<)
~
~ ()
a.. G
- S
c
::)
>-
~
~I t5
I ~
-
.i ns
"l:!lDO
~=-
o"l:!
- Q)
C"l:!"S
Q)Q)ns
1i}E":
-;;;.a1l
.C e=
.Q "l:! 'j: C\I
~faU)~
-1 ~
ell -g ~ .lD -:
.CUC'-_
U):B"l:!
a:c,-Q)E
cn,g ~ c Q)
C..!!i! - ~:t::
]~,g~~
Q)~E5
"l:!.Qe
ioj:g~
nsgCUCij"l:!
C.- C '- fa
o t5 .2> Q)
'-..9! U) c_
j "8 ,g &!g
o-g~~j
(.)CU-~"l:!
icaj '*
~ > ~ '.~
Ons":
E..: U._
c nsU)
t?~1l1l,g
o
o
B~ - i~
-
~s jg CDw
J; ]I ,4g l~
E1~ ~ :81
"" 5
~$ I a.>
[e ~-8
._ as
g-6 _13
~~
ii .8 ..c:
m u;!:
~'6 t3 ~~
g~ .l a> a>
il
'ilB E
:~~ .a
-as 'E ~ a>
~5- as ~Hl
'Sa> d e!1-
.o~..:. .5 i.~
C> CD j
.6 1l en
-g e-.!8 d II! ~
"U Q. 't:J j '= c:
.5 CD m ~8
.J!2s-ij ~~
'~..c: as S
Q).!!! a 12ti
~~.5 i >-a>
't:J~~ ~=
aas~ it . C>
-c:
tlsj 't:J Z'!!j ~
[~ 13 a a.~ =
.- ~ :> '" :~~ ~
:> '"
!if lil JS
.-::.l!!;E Q) :a..
't:J 5.~ Z
~ _-a ~
o'i>- E a>ClO
.~ .. ~ =!!!...
0 IS .. C"I.l
8.i~ c: Ji?lXl
a> 'i C\! ~
~,;; - .0
't:J d lB s u_
1i.5 ! 1 -a '5, 0
. '" ~j u
hS~ :2
:ilj en ~::; ~
g ....r",
.f~ ~ .8 '6.E
~ .as CD
e! 8 ~ ;!:crI.l
~~,g .. a>
",' ~i!
~as~ ~ .~~
... -= .
~ -lB ~
~jt 'i }]
-8 8.~ ..c: "'~
~ 0_
~~a. i as
~i~ t ~~
~~-8 ..: ~'1i
Q) .. (5
]I c. xi Gi . ""
ilv:tO .~ ~.~
_ '"
~o 't:J ~c:
'CD ~ ~ ,5 "'~
$ -0
.~.t'i~ m_
~,~~ ] oe
ma..
$~"E ~ ~~
-as ! ~s
'Eil~ -g .~
~.2 c: ~
~~i as a..
la>
a ~~
~l~ ~. Q)1fj
~ 0 rnC\! 0:_
Ni 0
~,gf [ C"i~
~~ ~i
2~a. ~=
-
I fqr--: "lv. v.~ ~~ gji - ~C'f C'fC'f ~v. ~<C! ...,01 ....C'f v.<C!
~ ~~ ~gj gJ~ ..,.., ~ ~t; ~~ ~. .~ ~~ .~ ~~
u
Ii
.It::
~
I ~fD fllf3 ~18 !SID 18m R _N CO) ... ~~ J::I!:! ~2 _N ~C1;
Iii .... .... .... .... CD CD
is
~
~
! ClD .., ClD CO) cq co:> ... ~N ~ ~ 01~ C'f cq ~ C'f 01 "l .. --:01 ::: ~ ~--:OI
j ""':czi ai .,; '" ~~ ;::- ~ ~:t '" ~ ~ ~ ~ ~ ~ ~~ ~~~
- N
'I
1'=
I ~<'; ~~ .... ~~ ~ . N CO) ~ ~ !S ~ ~ '" ~ - N ~;:1; :g :8 ~CD'"
Iii M . ... ... on '" '" '"
is
I~
:::I
en
j ~v. It) '" d '" ~ :: ~ ::! - M ~ ~ C'f ~ ~ - ~ cqC'f <C! '" 1t)Cl><'l
.2 C> C> 6 6 6- t\I t\I t') .. ... ... It) It) aico....
.a
ij
Ii
~
i '" .... CD '" S! :: ~ ~ :! ~ ~ ~ ~ ~ ~ N ~ ~ ~ ~ ~H:i gj gJ ~c;;~
as
is
~
~
~
~
C Part B - Hourly Prices
Equipment and Labor Rates
Equipment Type Typical Hourly Hourly Total
Clearing Equipment Labor Hourly
Crew Rate Rate Rate
Makeup
Bobcat Loader '2. !.J.D. DO '?no tJO 100.00
Bucket Truck ~ '~o. lJ1) (~bO IqQ. U-O
ChiooerlMulcher (S" throat) ').- ~.DD 30. ()f) 90.uD
ChiooerlMulcher (12" throat) 2- LU;i.oO ~.Or. T 2...5 .n7'\
Crew Foreman w/GeI! Phone and Pickup I 2~. c.ro ,?().oO rj~ UD
Dumo Truck, 18 CY-20 CY I ~.UD 4.0 .nn 86.00
Dumo Truck, 21 CY-30 CY I hO.UO L/..n.OO 90.00
Grader w/12' Blade I I O. cro ~ ,."...., ('::JO. D ()
Hvdraulic Excavator, 1.5 CY I (,?I)". <f1) Lj-f) .Oi) 1273.00
Hvdraulic Excavator 2.5 CY f f). lID ).01) I~I'I.;JD
Knuckleboom Loader 'J- QO.(JO ') . on f/"f). f 1f\
Laborer w/Chain Saw f In.lfl) ).OD +0. cJD
Laborer w/smal!tools, traffic control, flaa person - L Q. ()l) tJ.f\. ( If)
Lowbov Trailer wffractor '1~.c m 11..("). n,) IP5.00 I
Mobile Crane (Adeauate for hanaina limbs/leanina trees) 1..- 1'15.()[) ~ID. 0 0 2'1~.o/''')
Operations Manager w/Cel! Phone and Pickuo , 1..15. LJT) 50. em r~.(')7'I
Pickuo Truck, 1/2 Ton Vl1. cfI) 3Q.UD ;c;- .0 /',
TraffIC Control, Temoorarv Sinale Lane Closure 1 ..,~. () 'I ao.ou C).f)/)
0 Tree Climber S/Chainsaw 2- Q.v, IL -D. u"" 'I...' . () j)
Wheel Loader, 2.5 Cy, 950 or similar I "j;:\.c)i If.,l.r"i I .nfl
Wheel Loader, 3.5 - 4.0 CY. 966 or similar , S ~C). 00 l:.n.U1 (2"] .011
Wheel Loader. 4.5 CY 980 or similar ( qFi.OO LH1.(!l) 13L;.n;')
Wheel Loader-Backhoe, 1.0 -1.5 CY I '11:').lrD LIn.(Y u 11S:::;.n /\
Other - Please List
No1Bs:
No1B 1. Total TIme and Malarial Prices shall Include all labor (operators, laborers, and supervisors), equipment and materials including but not limited
to: suppllet, equipment maintenance, repairs, repair parta, fuels, IUbrlcan1l, cellular phones, IrInsportallon, traffic control and housing, If rsqulrsd,
necessary to accomplish the proJect
Note 2. Identify the EqulpmentiPtll80nnel that constltutll a Typical Clearing Crew In the column provided
The Contractor will provide (P (number) of crews dedicated to perform the Work within the first 24
hours following Notice to Proceed.
The Contractor will provide I 0 (number) of crews dedicated to perform the Work within the first 48
hours following Notice to Proceed.
o
45
c
SUBMITTED THIS
DAY OF
,20
If PROPOSER is: AN INDIVIDUAL
By:
(SEAL)
(Individual's Name)
Doing business as:
Business address:
Phone No:
Facsimile No:
If PROPOSER is: A PARTNERSHIP
By:
(SEAL)
(Firm's Name)
General Partner:
Business address:
Phone No:
Facsimile No:
.
If PROPOSER is: A CORPORATION
By:1A (;r (ffl no (I~ SifV I U., , I t10 "
I:"'-Pr\J~co~grationls Na )
State of Incorporation: U L-V' v-
Representative: ~tvv lrv . ~rDO k5
CPo ( "ame of Person Authorized to Sign)
Title:
Business address: I O)C t.--5 tj
Phone No: ,- .?Y1 - 2-
Facsimile No: 2J..I
(Corporate Seal)
LJ '2J5 /tJ
~
If PROPOSER is: A JOINT VENTURE
(Name)
(Address)
(Name)
(Address)
(Each joint venture must sign. The manner of signing for each individual, partnership, and corporation that is a party
to the joint venture should be in the manner indicated above.)
DOCUMENT CONTINUES ON NEXT PAGE
o
46
c
STATE OF AltlbLmtL
COUNTY OF tt +- I ~O
I HEREBY CERTIFY that a meeting of the Board of Directors of the IACr 6nr\d.ltl~ ~vf u ~ I LI1U .
CERTIFICATE OF AUTliORITY
(IF CORPORATION)
a corporation existing under the laws of the State of Crt-a r Q'l' ff--, , held on~ B
the following resolution was duly passed and adopted:
, 2O..Q,ft,
"RESOLVED, that, as President of the Corporation, be and is hereby authorized to execute the Proposal dated,
~~ ~ I 20llZ.. , to the City of Sunny Isles Beach and this corporation and that their execution
thereof, ttested by the Secretary of the Corporation, and with the Corporate Seal affixed, shall be the official act and
deed of this Corporation..
I further certify that said resolution is now in full force and effect.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the corporation this
't:J ,day of ~ I 2~.
o
secreta~ .u::/ ~~
DOCUMENT CONTINUES ON NEXT PAGE
c
47
___ .__..___...__ _ __.._.______.._____ _____._.____.___.._a~...
c
SECTION 8
BID BOND
STATE OF FLORIDA
COUNTY OF Wa..~- ~
KNOW ALL MEN BY THESE PRESENTS, that wa, TIC Grin::iing ~ces Ire. as Principal, and
li1:erty t1l1:ll3l Insurarce C'a1umv . as Surety, are held and firmly bound unto the
City of Sunny Isles Beach, a municipal corporation of lhe State of Florida in lhe sum of
Five Perca1t (5%) of tiE krnmt Bid--EloIIaJ'S ($ ). lawful money of the United States, for the payment
of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors
jointly and severally, firmly by these "presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the aCCCXilpanying Bid
dated, 8/12/08 2008 for: RFP #ff3-07 -01 - .
c
WHEREAS, it was a condition precedent to the submission of said Bid that a cashier's check or Bid Bond in the
amount of live percent (5%) of the Base Bid be submitt.ed with said Bid as a guarantee that the Proposer would, "
awarded the contract, enter into a written Contract with the City for the performance of said Contract, within ten (10)
consecutive calendar days after written notice having been giv~n of the Award of the Contract.
NOW, THEREFORE, the conditions of this obligation are such that If the Principal within ten (10) consecutive
calendar days after written notice of such acceptance, enters into a written Contract with the City of Sunny Isles
Beach and furnishes the Performance and Payment Bonds, satisfactory to the City, each in an amount equal to one
hundred percent (100%) of lhe Contract Price, and provides all required Certificates of Insurance, then this obligation
shall be void; otherwise the sum herein stated shall be due and payable to the City of Sunny Isles Beach and the
Surety herein agrees to pay s!idsum immediately, upon demand of the City, in good and lawful money of the United
States of America, as liquidated damages for failure thereof of said Principal.
IN WITNESS WHEREOF, the above bonded parties have executed this instrument under their several seals this
. 12 (lay of k.gust. ,2008, the name and the corporate seal of each corporate party
being hereto affixed and these preSents belng duly signed by its undersigned representative.
DOCUMENT CONTINUES ON NEXT PAGE
\
I
C
50
o
o
o
llQ12.. Dv--~ tLoiW-
Business Address
~v) sto YI., 0'L olD 2.. 51,p
City, State, and Zip Code
l2.51.Jl") 3C1 5- 2 '24--~
Business Telephone
ATIESTEO: Power of Attorney Attached
Secretary
.Impress Corporate Seal
-
Affix Corporate Seal
l25U>) 3OJ5- q2~~
Business Facsimile
Liberty Mutual Insurance Company
By:
IMPORTANT
Surety companies executing bonds must appear on the Treasury Departmenfs most current rlSt (circular 570 as
amended) and be authorized to transact business in the State of Ronda.
END OF SEcnON
51
THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND.
This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to
the extent herein stated.
2292827
o
LIBERTY MUTUAL INSURANCE COMPANY
BOSTON,MASSACHUSETTS
POWER OF ATTORNEY
KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the "Company"), a Massachusetts stock insurance
company, pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint
H. RilEY HOLLIDAY, WilLIAM R. PHilliPS, MICHAEL D. REGAN, NANCY LOCKE, H. A. WRIGHT, JR., ALL OFTHE CITY OF
FRAN KllN, STATE OF TENNESSEE........................ ...~..........................................................................................................
...............................................................................................................................................................................................
, each individually if there be more than one named, its true and lawful attorney-In-fact to make, execute, seal, acknowledge and deliver, for and on its
behalf as surety and as its act and deed, anv and all undertakings, bonds, re.cognizancesimd other surety obligations in the penal sum not exceeding
FIFTY MILLION AND 00/100************'******* . DOLLARS ($ 50,000,000.00***** ) each, and the
execution of such undertakings, bonds, recognizances and other surety obligations, In 'pursuance of these presents, shall be as binding upon the
Company as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons.
That this power is made and executed pursuant to and by authority of the following By-law and Authorization:
.:
'iij
o
Q.
Q)
'0.
~Ul
e:Q)
ca$
.ae:
.:f!
:C!lj
l!!Cl
uQ)
'0.2
...ca
Q)>
~
G
~-
lij'iij
,,2l!!
...
arO
0$
e:ca
~...
Q)-
ClUl
caQ)
Cl'"
t::$
0.5
E ~
...$
oca
-...
'0>-
::U
cae:
>Q)
-...
0'"
z~
By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys-in-fact:
:>.
ca
'0
Ul
Ul
Q)
e:
'iij
;:,
.a
>-
e:
ca
=5
~1-
>-00
Q)W
EE
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of 0 Q.
Liberty Mutual Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 25th day of Februarv , :t: 0
2008 <M
o~
...'0
Q)e:
::ca
OE
c.ca
.~o
.co
- ..
-0)
Oe:
>-Q)
:!::Q)
:2!
-Q)
~.a
Q)o
.s~
E~
,=~
'E~
00
U,..
oeD
I-~
ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the
chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to make,
execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such
attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their
signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be
as binding as if signed by the president and attested by the secretary.
Pursuant to Article XIII, Section 5 of the By-Laws, Garnet W. Elliott, Assistant Secretary of Liberty Mutual Insurance Company, is hereby
authorized to appoint such attorneys-in-fact as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and
deliver as surety any and all undertakings, bonds, recognizances and other surety obligations.
That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect.
LIBERTY MUTUAL INSURANCE COMPANY
COMMONWEALTH OF PENNSYLVANIA
COUNTY OF MONTGOMERY
ss
By~4 IV- ~~
Garnet W. Elliott, Assistant Secretary
On this ~ day of Februarv , 2008 , before me, a Notary Public, personally came Garnet W. Elliott, to me known, and acknowledged
that he is an Assistant Secretary of Liberty Mutual Insurance Company; that he knows the seal of said corporation; and that he executed the above
Power of Attorney and affixed the corporate seal of Liberty Mutual Insurance Company thereto with the authority and at the direction of said corporation.
p.
OF
~~
\..'-1\>1 -fJ
CERTIFICATE p\')~V
I, the undersigned, Assistant ecretaryof Liberty Mutual Insurance Company, do hereby certify that the original power of attorney of which the foregoing
is a full, true and correct copy, is in full force and effect on the date of this certificate; and I do further certify that the officer or official who executed the
said power of attorney is an Assistant Secretary specially authorized by the chairman or the presidenfto appoint attorneys-in-fact as provided in Article
XIII, Section 5 of the By-laws of Liberty Mutual Insurance Company.
,~ unto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year
~.-\ <~ COMMONWEALTH OF P.ENN LVANIA ~ Ii
-j;. No!ariaI &aI ~ 1/ -1-,,1
rOOlSaPllslQlla,Nota1yPutlt:: By ~
~'=~~ Teresa Pastella, Notary Public
Mlitfflt'er. P4lno$'y1l1Ania Association 01 Notarlij$
This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the
following vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of March, 1980.
VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a
certified copy of any power of attorney issued by the company in connection with surety bonds, shall be valid and binding upon the company
IflI\ with the same force and effect as though manually affixed.
,.., IN TESTIMONY WHEREO~~ve hereunto subscribed my name and affixed the corporate seal of the said company, this 12 day of
ALgust , LUJC
c
ACORD. CERTIFICATE OF LIABILITY INSURANCE OP ID TT I DATE IUlollDDIYYYY)
TAGGR 1 08/08/08
PRODUCER THIS CERllFICATE IS ISSUED AS A MATTER OF INFORMATION
Hawkins,Raw1inson, Lanier Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERllFICATE
P.O. Box 3493 HOLDER. THIS CERllFICATE DOES NOT AMEND, EXTEND OR
2515 East G1enn Avenue, Suite ALTER TIiE COVERAGE AFFORDED BYTIiE POLICIES BELOW,
Auburn AL 36831-3493
Phone: 888-822-1173 Fax: 334-821-5801 INSURERS AFFORDING COVERAGE NAlC#
INSURED INSURER A: eo-p.n1on Property. ea.ua1ty 12157
INSURER B:
TAG Grinding Services, Inc. INSURER C:
8395 Williams Road INSURER 0;
Pa1matto GA 30268
INSURER E:
COVERAGES
c
THE POLICIES OF INSURANCE liSTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWlTHSTANOtNG
ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HERSN IS SUBJECT TO ALL lliE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
Ill'fliK ~~: POLICY NUMBER ~~~~i: D"-re' /MMlcDrm LIMITS
LTft TYPI! 01' INSUltAHce
~NERAL LIABILITY EACH OCCURRENCE $
COMMERCIAl GENERAL LIABILITY PREMISES lEa oc:wrencel $
- ~ CLAIMS MADE D OCCUR
,-- MEO EXP (Arry one pel'SO<1) $
PERSONAL &ADV INJURY $
f--
'--- GENERAl AGGREGATE $
~'L AGGRn UMfT APPLIES PER: PRODUCTS - COMPIOP AGG $
POLICY ~fg: n LOC
AUTOMOBILE LIABILITY COMBINED SJNGlE lIMIT
- $
ANY AUTO (Ea accident)
-
- ALL OWNED AUTOS BODILY INJURY
$
SCHEDULED AUTOS (Per person)
-
- HIRED AUTOS BODILY INJURY
$
NON-OWNED AUTOS (Per accident)
I--
I---- PROPERTY DAMAGE $
(Per accIdentl
GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $
) R ANY AUTO OTHER THAN EAACC $
AUTO ONLY: AGG $
EXCESSIUMBRELLA LIABILITY EACH OCCURRENCE $
tJ OCCUR 0 CLAIMS ~DE AGGREGATE $
$
~ DEOUCTIBLE $
RETENTION $ $
WORKERS COMPENSATION AND X hORYLIMlTS I IU~;
A EMPLOYERS' LIABILITY ewc 3070514 06 03 07/27/08 07/27/09 E.L. EACH ACCIDENT $ 1000000
AIff PROPRlETORlPAmNERlEXECUTIVE
OFFICERlMEMBER EXClUDED? E.L. DISEASE - EA EMPLOYEE $ 1000000
If yes, describe under E.L DISEASE - POLICY LIMIT $ 1000000
SPECIAl PROVISIONS below
OlllER
DESCRIPTION OF OPERATIONS' LOCATIONS 'VEHICLES' EXClUSIONS ADDED BY ENDORSEMENT' SPECIAL PROVISIONS
CERTIFICATE HOLDER
CANCELLATION
C:ITSU01
SHOULD ANY OF THE ABOVIi D.sGRlIiIiD POUCI&S Iili CANCELLED BSFDRIi llIll &xPIRATION
DATE THEREOF, THE ISSUINO INSURER WILL ENDEAVOR TO MAIL ~ DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
IMPOSE NO OBLIGATION OR LIABIl.ITY OF ANY KIND UPON THE INSURER, ITS AOENTS OR
REPRESENTATIVES.
AU 1: VI;
@ACORD CORPORATION 1988
~
c
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon.
,
CCORD 25 (2001.08)
...
c
ACORD", CERTIFICATE OF LIABILITY INSURANCE I DATE (MMlDDIYYYY)
08/08/2008
PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
J Smith Lanier & Co of Newnan ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
P. O. Box 71429 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Newnan, GA 30271-1429
770683-1000 INSURERS AFFORDING COVERAGE NAIC#
INSURED INSURER A:. Employers Mutual 21415
TAG Grinding Services, Inc. INSURER B: Federal Insurance 20281
J W B Leasing Co., Inc. INSURER c:
16418 Highway 22 E INSURER 0:
Daviston, AL 36256-6616 INSURER E:
Client#: 67108
50T AGGRINDIN
COVERAGES
c
THE POLICIES OF INSURANCE LISTED BElOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO AlL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
LTR NSR TYPE OF INSURANCE POLICY NUMBER P~}~~Y EFFECTIVE Pg~flIW,b~~N LIMITS
A GENERAL UABILITY 3074918 07/27/08 07/27/09 EACH OCCURRENCE $1 000 000
- DAMAGE TO RENTED
x.. COMMERCIAL GENERAL LIABILITY $100000
- :=J CLAIMS MADE [!] OCCUR MED EXP (Anyon.. person) $5.000
X PO Ded:500 PERSONAl & ADV INJURY $1.000000
GENERAL AGGREGATE $2.000000
GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COM~OPAGG $2.000 000
I POLICY fXI '18T n LOC
A ~TOMOBILE LIABILITY 3E74918 07/27/08 07/27/09 COMBINED SINGLE LIMIT
~ IWY AUTO (Ea accident) $1,000,000
ALL OWNED AUTOS BODILY INJURY
- $
SCHEDULED AUTOS (Per person)
-
~ HIRED AUTOS BODILY INJURY
$
~ NON.QWNED AUTOS (Per accident),
PROPERTY DAMAGE $
(Per accident)
GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $
==1 IWY AUTO OTHER THAN EA ACC $
AUTO ONLY: AGG $
~ESSlUMBRELLA LIABILITY EACH OCCURRENCE $
OCCUR D CLAIMS MADE AGGREGATE $
$
==1 DEDUCTIBLE $
RETENTION $ $
WORKERS COMPENSATION AND I WC STATU-, I IO~
EMPLOYERS' LIABILITY
IWY PROPRIETORlPARTNERlEXECUTIVE E.L. EACH ACCIDENT $
OFFICERlMEMBER EXCLUDED? E.L. DISEASE - EA EMPLOYEE $
If yes. describe under E.L. DISEASE - POLICY LIMIT $
SPECIAL PROVISIONS below
B OTHER Equipment FI 6640674 07/27/08 07/27/09 Limit Per Policy
B Leased/Rented 6640674 07/27/08 07/27/09 $100,000 Per Item Limit
Equipment $5,000 Deductible
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
CERTIFICATE HOLDER
CANCELLATION
c
City of Sunny Isles Beach
Office of the City Clerk - 4th Floor
18070 Collins Avenue
Sunny Isles Beach, FL 33160
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL ....1Jl... DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT. BUT FAILURE TO DO SO SHALL
IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE
@ ACORD CORPORATION 1988
ACORD 25 (2001/08) 1 of 2
#S507829/M505487
c
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon.
c
c
ACORD 25-5 (2001/08) 2 of 2
#S507829/M505487
o
o
o
State of Florida
Department of State
I certify from the records of this office that TAG GRINDING
SERVICES, INC. is a corporation organized under the laws of Georgia,
authorized to transact business in the State of Florida, qualified on
March 8, 2006.
The document number of this corporation is F0600000 15 51.
I further certify that said corporation has paid all fees due this office
through December 31, 2008, that its most recent annual report was filed
on March 13, 2008, and its status is active.
I further certify that said corporation has not filed a Certificate of
Withdrawal.
Given under my hand and the Great Seal of
Florida, at Tallahassee, the Capital, this the
Eighth day of August, 2008
~vrs
Secretary of State
Authentication 10: 400134117454-080808-F06000001551
To authenticate this certificate,visit the following site, enter this
10, and then follow the instructions displayed.
bttps://efile.sun biz.org/certautbver.btml
c
:arl K. Wood, Tax Collector Local Business Tax Receipt Orange County, Florida
his local bU$ineS5 tax receipt Is in add<tion to and not In lieu of any other tax rEoqulred by law or municipal ordinance. Businesses are subject to regulation of zoning. he;\lth and other
lwful authorities. This receipt Is valid from October 1 through September 30 of receipt year. Dellnquont penalty III addod October 1.
a--ORIGINAL'" 2001 EXPIRES 9/30/2008
ADMIN SERVICES $30.00 1 EMPLOYEE :
3100-1049195
'.'l ',',
.~OWDEN JOHN T
TOTAL TAX
PREVIOUSLY PAID
TOTAL DUE
$30.00
$0.00
$30.00
. . .~.
..'.TAGGRINDIN;G,SERVICES INC
.1655 SUNNYSIDE DR
MAITLAND FL 32751
1655 SUNNYSIDE DR (MOBilE)
E - MAITLAND, 32751
12/11/2007 04:13 PH r.sh 0101 Reg OG23
T/Ref 0023005142 0&1: 12/11/2007
530.00 Va 1 110: 0023.0066(1,1
This receipt is official when validated by the Tax Collector.
~
o
:arl K. Wood, Tax Collector Local Business Tax Receipt Orange County, Florida
his local business ta~ receipt is in addition to and not in lieu of any other tax required by law or municipal ordinance. Businesses are subject to regulation of zoning, health and other
lwful authorities. This receipt Is valid from October 1 through September 30 of receipt year. Dollnquont ponalty it; addGd Octobllr 1.
O."ORIGINAL". 2007 EXPIRES 9/3012006
ADMIN SERVICES $30.00 1 EMPLOYEE :
.... "r'
i":~')>;~;
..' .~ "1 '".. r,.;
TOTALTAX
PREVIOUSLY PAID
TOTAL DUE
530.00
$0.00
$30.00
:", "','
BO.YVDEN JOHN T
,'{,'
......
. : .
TAG GRINDING SERVICES INC
'G~S'UNNYSIDE DR
MAITLAND FL 32751
1655 SUNNYSIDE DR (MOBILE)
E - MAITLAND, 32751
This receipt is official when validated by the! Tax Collector.
G
3100-1049195
'2/ 11 nOD? 04: 13 PM C~h 0101 Reg 0023
T fRef 0023005142 D& I: 12/11/2007
$30.00 lia 1 110: 0023-00tifi04
o
G
o
-
..,., ..,.,.
...., TAG ....,
GRINDING SERVICES, INC.
LIST OF PROPOSED CONTRACTORS
1. BMB Trucking
2. Vow Trucking
3. Claybrook Construction
4. Q & A Grinding
5. Diesel Air
6. Jim Rush Construction
7. M.D. Ross Construction
8. Complete Environmental and Remediation Company
9. Pelican Ice Company
10. Storm Services, LLC
11. Campbell Roofing
In addition to the above noted subcontractors that may be used on this project, we attempt to
employ local individuals and companies to assist with cleanup efforts as well. In order to gain
local subcontractors, we will run advertisements in local newspapers and on local radio stations
and will interview applicants to review qualifications. Once these individuals or companies are
hired, we will provide the necessary training to bring them up to the standards required to
participate on projects with us. For more adequate information on our subcontracting policy,
please refer to "Subcontracting Policy" under tab 3 in the enclosed information.
-
o
SECTION 9
PROPOSER QUALIFICATION STATEMENT
The Proposer's response to this questionnaire will be utilized as part of the City's overall Proposal Evaluation and
Contractor selection,
The undersigned guarantees, by signature, the truth and accuracy of all statements and the answers contained
herein,
9.1. Please describe your company in detail.
PI~0 See dJW..Lheci "&ew-hVt; Sml'Y\llY'lf" under Tab 1
9.2. The address of the principal place of business is:
PO. ~)( 26) 1(P1~ ])r-~ 'Rei.
"Do..v., SID) I A-L 3<D2t:J(p
9.3. Company telephone number:
(25tp) 3'15~ 224-3
9.4. Number of employees:
'+3
o
9.5. Number of employees assigned to this project:
fO +uJI--h~ ptu<) (lc1L~ ~+.-h~ Yu.vLS
9.6. Company's Identification Number(s) for the Internal Revenue Service:
F (; /l'J -t 55 - 2 ~ '7 ~ 6lP 5
9.7. Miami-Dade County and City of Sunny Isles Beach Occupational Ucense Number(s):
to be:- ~cYtlL ~e-J.- ~-Ac-v tlY\J(J.Y! of CtrYLw.cJ-
9.8. How many years has your organization been in business?
S1ri(,~ (et;. I~~~
9.9. What similar engagements is your company presently working on? If none, write "none",
PIt:d.<,6 sa a~hd II CurfCr1f Obl;yhom" under TabZ
o
52
Q
9.10. Have you ever failed to complete any work awarded to you? If so, where and why?
No
9.11. The work described in this project is to occur within public right-of-ways, parks, public facilities, and
buildings. List similar governmental or quasi-governmental projects for which you have completed or have on-going
services. If none, write "none",
PROJECT 1:
Project Name/Location
---El{{LS~ S~e CLheJ1:eJ
\\ PO.S~ 'Pev foV/'Yl0J1C61 fLna
\\ LLtfo-s 0 {:-- R e-kv-YlLl tI Vll1der-
la.~ 2-
Owner Name
Contact Person
Contact Telephone No.
Yearly Budget/Cost
Dates of contract
From:
To:
PROJECT 2:
Project NamelLocation
Owner Name
0 Contact Person
Contact Telephone No,
Yearly Budget/Cost
Dates of contract From: To:
PROJECT 3:
Project NameILocation
Owner Name
Contact Person
Contact Telephone No.
Yearly Budget/Cost
Date s of Contract From: To:
o
53
o
9.12. List the following infonnation concerning all contracts in progress as of the date of submission of this
Proposal. (In case of joint venture, list the infonnation for all joint ventures.) If none, write "none",
Project
Name
Owner
Total
Contract
Value
Contracted
Date of
Completion
Percentage
of
Completion
(to date)
9.13. Has the Proposer or hislher representative inspected the public right-of-ways, parks, public facilities, and
buildings; and does the Proposer have a complete plan for its perfonnance? 'Ie')
9.14. Will you Sub-Contract any part of this work? 'I {- n. e. e t:lLc:l
If so, give details including a list of each Sub-Contractor that will perfonn work and the work that will be
perfonned by each Sub-Contractor.
Classification of Work
Name and Address of Sub-Contractor
o
~bLOV\. m em r
L'l b-\--
If, prior to Notice of the Award. the City or the Contractor has reasonable objection to and refuses to accept any
Supplier, person or organization listed. the Proposer may, prior to Notice of Award, submit an acceptable substiMe
without an increase in their fee price.
.
54
o
9.15. State the name of your proposed staff supervisor and give details of hislher qualifications and experience in
managing similar work.
f leeL'lL 'iLL ~ i ~ P~r']eJ" cu,tt · r rrui, II ~ f hpu-i tVlCL ~
9.16. State the true, exact, correct and complete name of the partnership, corporation or trade name under which
you do business and the address of the place of business. (If a corporation, state the name of the president and
secretary. If a partnership, state the names of all partners. If a trade name, state the names of the individuals who do
business under the traqe name.). I .'--' 'TL ! V D' LA r2.m;.p
'1l1(;r (;ry1t-1d.-t.~ 6erVl US, VIe.. Wf:S.. 'Ov~. --()f"'5
J (, 72- r.:w-~ t2..4-. ~c..-J ,r-u'<>', Je...- ~ yv, (3-nok..,S
Po (b)\( 2-'1
~viS+t>VlIf11.. 3lP26lP
9.16.1. Correct name of the Proposer is:
111Gr GYIY"lcL-~ 5uV\'ceS,lv10 .
9.16.2.
o
9.16.3. The names of the corporate officers, or partners, or individuals doing business under a trade name, are as
follows: ?re.~ / V. 'P.: tJ-~ ~r5
Sec."; Tr- eA.S. '. ljifY'1 'v\J. '-VYlJ 0 k.. '::>
9.16.4. List all organizations which were predecessors to Proposer or in which the principals or officers of the
Proposer were principals or officers. If none, write "none".
NONe:
9.17. List and describe all bankruptcy petitions (voluntary or involuntary) which have been filed by or against the
Proposer, its parent or subsidiaries or predecessor organizations during the past five (5) years. Include in the
description the disposition of each petition. If none, write "none".
NONb
9.18. List and describe all successful Bid, Performance or Payment Bond claims made to your surety (ies) during
the last three (3) years. The list and descriptions should include claims against the bond of the Proposer and its
predecessor organization(s). If none, write "none".
NON8
o
55
-
o
9.19. List all claims, arbitrations, administrative hearings and lawsuits brought by or against the Proposer or its
predecessor organization(s) during the last three (3) years. The list shall include all case names; case, arbitration or
hearing identification numbers; the t~rb N~roject, If none, write "none",
Dated this ~~V\ day of _Av~/~ t- ,2008,
The foregoing instrument was acknowledged before me this~ day of
y~(}~~~~
(AFFIX NOTARY STAMP HERE)
Avou.st-
, 2008 by
o
.Jut.L~ ~~
Notary Public - State of IIIiIIMa CL-
:rf yes. CJ.- Cha...v l-bl e. ~rJ e r
Print or Type Commissioned Name
Personally Known Y.., OR
Produced Identifica~ ; Type of Identification Produced
END OF SECTION
o
56
o
SECTION 10
NON.COLLUSION AFFIDAVIT
STATE OF PtOJUDA A \tLb~
COUNTYOF PH- LCLcr~e /
The undersigned being first duly swom as provided by law, deposes, and says:
10.1. This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach
City Commission and that it will be relied upon by said County, in any consideration which may give to and any action
it may take with respect to this proposal.
10.2. The undersigned is authorized to make this Affidavit on behalf of,
-rA(r 111 rL 6erVi c.eS G .
(Name of Corporati ,Partnership, Individual, etc.)
a, r f)Y- PO~-h civJ , formed under the laws of (jff) r()t ~
(TyfJe of Business) (State)
&ifL~ / Tyf tLCZfU-ver- - Cro
(Sole Own r, Partner, President, etc.)
of which he is
o
10.3. Neither the undersigned nor any person, firm, or corporation named in above Paragraph 11.2, nor anyone
else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable
action for this proposal by the City, also that no head of any department or employee therein, or any officer of the City
of Sunny Isles Beach, Ronda is directly interested therein.
10.4. This proposal is genuine and not collusive or a sham; the person, firm or corporation named above in
Paragraph 11.2 has not colluded, conspired, connived or agreed directly or indirectly with any proposer or person,
firm or corporation, to put in a sham proposal, or that such person, firm or corporation, shall refrain from Proposing,
and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference
with any person, firm or corporation, to fix the prices of said proposal or proposals of any other proposer; and all
statements contained in the proposal or proposals described above true; and further; neither the undersigned, nor the
person, firm or corporation named above in Paragraph 11.2, has directly or indirectly submitted said proposal or the
contents thereof, or divulged information or data relative thereto, to any association or to any member or agent
thrreof. C . /? ~
.!..Jey-,rlJ hVOOl1vS ~ =rJ TO"/Lb-U VI" ~ - LrU
AFFIANT'S NAME W,.~ A FlANT'S TITLE
TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this ~ day of Au(J- St- ,2008.
Personally Known '/) or Produced Identification
Type of identification
(Affix seal here)
~ Ve f<$- ~~ Co....v~
NOTARY PUBLIC (name printed or typed)
END OF SECTION
c
57
o
SECTION 21
ANTI.KICKBACK AFFIDAVIT
STATEOFFEOOIC'A AL~
COUNTY OF a+ I~-e.--'
I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein proposed will be paid to
any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift,
directly or indirectly by me or any member of my firm or by an officer of the corporation.
By:~~,~
./ .
Title: D
The foregoing instrument was acknowledged before me this _ day of . 20_. by
\. J.fxr~ YV. 1QYDok.-S [name of person], as ( f"u
[type of a ority] , for-rftr ~~(1tll''J SvU. J lY\v [name of party on behalf of whom instrument was
executed].
AFFIX NOTARY STAMP HERE:
~~ ~Cv..c ~
Notary Public - State of ~ A-L.-
.=:fp r (6L ~~e.t/L<€- Co-v t:-r
Print or Type Commissioned Name
o
~erSOnallY Known ~
[] Produced Identification
OR
Type of Identification Produced
END OF SECTION
o
78
o
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBUC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR
OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
11.1. . This swam statement is submitted to City of Sunny Isles Beach City
Commission
by ()exr~ VV. ~O k-S'- C-Fo
~pnnt indiVIdual's name and title]
for ~cr 5 V)'u ~ en. v.
mitting swam statement]
whose business address is:
-' (p'l2- ~
ldD--V~Sfn1l ~
IZ-J- I P 0 0(j~ 2c:J
~
. Ou,2-5ll'
I
10
i
I
I
I
I
and (if applicable) its Federal Employer Identification number (FEIN) is F) rs - 2.3 7 "3 5" ~ 5
(If the entity had no FEIN, include the Social Security Number of the individual signing this swam
statement: .)
11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Rorida StaMes, means a
violation of any state or federal law by a person with respect to and directly related to the transaction of business with
any publiC entity or with an agency or political subdivision of any other state or with the United States, including, but
not limited to, any Proposal or Contract for goods or services to be provided to any public entity or an agency or
political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion,
racketeering,
conspiracy, or material misrepresentation.
11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1) (b), Florida Statutes, means a
finding of guitt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state
trail court of record relating to charges brought by indictment or information after July 1, 1989, as a resutt of a jury
verdict, non-jury trial, or entry of a plea of guilty or nolo contendere.
11.4. I understand that an "affiliate" as defined in Para. 287.133(1) (a), Florida StaMes, means: a.) predecessor
or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person
who is active in the management of the entity and who has been convicted of a public entity crime. The term
"affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who
are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest
in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's
length agreement, shall be a prime facie case that one person controls another person. A person who knowingly
enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the
preceding 36 months shall be considered an affiliate.
'0
11.5. I understand that a "person" as defined in Para. 287.133(1) (e), Rorida StaMes, means any natural person
or entity organized under the laws of any state or of the United States with the legal power to enter into a binding
Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or
which otherwise transacts or applies to transact business with a public entity. The term "persons. includes those
59
o
officers, directors. executives, partners. shareholders, employees, members, and agents who are active in
management of any entity.
11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity
submitting this sworn statement. (Indicate which statement applies.)
.i.- Nehher the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity. nor any affiliate of the
entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989.
_ The entity submitting this sworn statement, or one or more of hs officers. directors, executives. partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the
entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989.
_ The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the
entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has
been a subsequent proceeding before a Hearing Officer of the State of Aorida, Division of Administrative Hearings
and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the
Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity
submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.)
o
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC
ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS
FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO
UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A
CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA
STATUTES. FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM.
By:
IT~ ed Name)
(Title)
SWO~~~~~iS~ ihA-tyst-
~~ ~Ait~ (1 J1.Ar0t
, 20~ by
(AFFIX NOTARY STAMP HERE)
Signature: Notary Public - State of florida ftt-,
,-lYe.- ~6--- (lJ1tVlt-VlQ- we-r
Print or Type Commissioned Name
Personally Known ~ OR Produced Identification
Type of Identificati~
END OF SECTION
.
60
o
SECTION 17
-
ACKNOWLEDGMENT OF CONFORMANCE
WITH OSHA STANDARDS
To: City of Sunny Isles Beach
We, ~A{r iff I flM Vtj 0ifvf a~ } LAG - ,hereby acknowledge and
[Prime Contractor]
f,m~0!-t"'\'-'1 ~vls V8
agree that we, as the Prime Contractor for the (6 J (uX ';)~"" ~ .V'&.-{ Services Contract, R.FP~ '07 "'0 ~ as
specified, have the sole responsibility for compliance with a I the reqUirements of the Federal Occupational Safety
and Health Act of 1970, and all State and local safety and health regulations, and agree to indemnify and hold
harmless the City of Sunny Isles Beach against any and all liability, claims, damages losses and expenses they may
incur due to the failure of
An~ * It ( 1 ~W IffYlmcfv rs
[Sub-Corftractor]
[Sub-Contractor]
o
[Sub-Contractor]
to comply with such act or regulation.
END OF SECTION
.
74
,
--mCx GY~ .(1 ~ ~rvi (tJs, I en v.
CONTRACTOR
eFa
TITLE
BY:~.v/~
/-
o
SECTION 18
EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT
The contractors and all subcontractors hereby agree to a commitment to the principles and
practices of equal opportunity in employment and to comply with the letter and spirit of federal,
state, and local laws and regulations prohibiting discrimination based on race, color, religion,
natio~nal reg' on, sex, age, handicap, marital status, and political affiliatioo or belief.
Signed:~~#~
Title: 0
Firm: 'tf\ (;r W--l VI tL.-~ & .y v\ (Q c., ,l VI U
Address: lli12 ~ ecJ., Po 1tD~ 261 ~S-fzn1.1 PrL '3to'2-q~
I
END OF SECTION
o
I
10
I
I
I
i
75
o
o
.
SECTION 19
CONFLICT OF INTEREST STATEMENT
STATEOFA:eRt61\~
COUNTY OF ~
BEFORE ME, the undersigned authority, personally appearedJ 01" ("11 w. t9no kS , who was duly
sworn, deposes, and states:
19.1. I am the &(../1YU~( l r -- CPo of1B Cr (m ~j)~ ~(' r0 (a .) ho
with a local office in'Wt0v1S+OY\ I l\t- and principal office in ~~frwt I A-u. )
19.2. The above named entity is submitting a Proposal for the City of Sunny Isles Beach, RFP No.
OR ~('/1 '0 \ described as: Emergency Debris Clearing and Removal Operations.
19.3. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his
own knowledge.
19.4. The Affiant states that only one submittal for the above Proposal is being submitted and that the above
named entity has no financial interest in other entities submitting proposals for the same project.
19.5. Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement,
participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with
the entity's submittal for the above proposal. This statement restricts the discussion of pricing data until the
completion of negotiations if necessary and execution of the Contract for this project.
19.6. Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or otherwise
ineligible from participation in contract letting by any local, State, or Federal Agency.
19.7. Neither the entity, nor its affiliates, nor anyone associated with them have any potential conflict of interest
due to any other clients, contracts, or property interests for this project.
19.8. I certify that no member of the entity's ownership or management is presently applying for any employee
position or actively seeking an elected position with the City of Sunny Isles Beach.
19.9. I certify that no member of the entity's ownership or management, or staff has a vested interest in any
aspect of the City of Sunny Isles Beach.
19.10. In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above
named entity, will immediately notify the City of Sunny Isles Beach.
Dated this ~ day of ~ L~ l--
;#-~
Sworn to and subscribed before me this _ day of
!l Personally Known )() OR
o Produced Identification ; Type of Identification
~~~r~
NOTARY PUBLIC STATE OF RtGRIOA At ~ft
,2008.
"i\1 . By-oo l.c 5
e Name and Title
,2008.
76
o
o
.
SECTION 20
DISPUTE DISCLOSURE FORM
20.1. Has you firm or any of its officers, received a reprimand of any nature or been suspended by the
Department of Professional Regulations or any other regulatory agency or professional associations within the last
five (5) years?
NO 1l-
YES
20.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract
or job related 10 the seM,r" firm provides in the regular course of business within lf1e last live (5) years?
YES NO
20.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Proposal
protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of
business?
YES NO VJ If yes, state the nature of the request for equitable adjustment, contract claim,
litigation, or protest, an~rief description of the ease, the outcome or status of the suit and the monetary
amounts of extended contract time involved.
I hereby certify that all statements made are true and agree and understand that any misstatement or
misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this
Proposal for the City of Sunny Isles Beach, RFP No. 08-07-01, Emergency Debris Clearing and Removal Operations.
~A (;r 6rv 1'r"\c11 ~ ,,<Sty V\. u.~ ) l..f\L- .
Firm
-AuQU-~r 8..2008
Date
~~f'~
utr r~ \rJ. 15 r-- ()() kS
Print or Ty Name and Title
END OF SECTION
77
........
-
C)
SECTION 22
PROPOSAL CHECKUST
THE FOLLOWING ARE REQUIREMENTS OF THIS PROPOSAL. USE OF THIS CHECKLIST WILL HELP ENSURE
THAT YOUR SUBMISSION IS COMPLETE.
Place a check mark in the "Done" column as you complete and enclose each item.
C)
Reauired Done Reaulrement
..J / Proposal Response Sheet I Fee Schedule Fonn I
ProDosalSD~fications
, ,/ Proposal Security - Five Percent (5%)
, ,/ Certificate(s) of Insurance
, v' Certificates of Competencies
..J ./ Local Business Tax (Occupational Business License)
..J ,/ State License(s)
..J v' List of Proposed Sub-Contractors
..J v' Proposer Qualification Statement
..J ,/ Non-Collusion Affidavit
..J /I" Non-Kickback Affidavit
..J v' Public Entity Crimes Sworn Statement
..J ./ Acknowledgement of Confonnance with OSHA Standards
..J V' Equal Opportunity/Affinnative Action Statement
..J ./ Conflict of Interest Statement
..J .,/ Dispute Disclosure Fonn
..J V RFP Checklist
This checklist must be part of the RFP. Please read the entire RFP documents thoroughly to ensure that
your submission Is complete.
END OF SEcnON
.,
79
Tag Grinding
2563959269
p.1
...,., .~
...., TAG ...~
GRINDING SERVICESt INC.
FACSIMILE
TO: Rick
City of Sunny Isles Beach
FAX: (305) 792-1683
FROM: Charlene Daniel
Procurement Services
RE: RFP #08-07-01, Emergency Debris Clearing and Removal Operations
NOTE:
Per my conversation with you, I am forwarding page 37 from the bid documents on
the above noted bid as instructed in the submittal requirements. I have
acknowledged both addenda on this page and request. Since I have already
forwarded our response to you, I am requesting that this be included in our
response as a replacement for page 37 in the original submission. If you have
questions or need additional information. please feel free to contact me at (256) 395-
2243. Thank you for your assistance.
P. O. Box 25 .. Davlston .. Alabama .. 36256 .. OffIce: (256) 395-2243 ... Fax: (256) 395-9269
8395 WIlliams Road * Palmetto * Georgia * 30268 .. Offke: (770) 969-7980 * Fax: (770) 969-7988
Tag Grinding
2563959269
p.2
seCTION 7
?ROPOSAL RESPONSE SHEET I QUALIFICATIONS I FE! SCHEDULE FORM
City of Sunny Isles Beach
018070 Corms Avenue
Sunny Isles Beach, Florida 33160
RF? No. 08-07.Q1 for Emergency Debris Oearing and Removal Operations
The undersigned Proposer proposes and agrees. if this RFP is accepted. to enter into an agreement with The City of
Sunny Isles Beacf1 in 1tle fonn included in the Contract Documents to perfonn and furnish all Work as specified or
indicated in the Contract Documents fer the Contract Prce and within the Contract Tune indicakd in this RFP and in
accordance with the other terms and conditions of the Contract Documents.
7.1. The Proposer accepts all of the tenns and conditions of the Advertisement or AFP and Instructions to
Proposers, including without limitation those dealing with the disposition of Bid Security. This proposar wift remain
subject to acceptance for 90 days after the day of proposal opening. The Proposer agrees to sign and submit the
Agreement with the Bonds and other doctJments required by the RFP Requirements wi1hin ten (10) days after 1I1e
date of the City's Notice ot Award.
7.2. In submitting this proposal, the Proposer represents, as men fuHy set forth in the Agreement, thai:
7.2.1. Proposer has examined copies of all the Proposal Documents and of the following Addenda (receipt of aft
which is hereby acknowledged.)
Aclmdum No. I Dated: ~
Addendum No. ~ Dated: 8.J I J
Addendum No. Dated: 0
Addendum No. Dated:
7.2.2. The Proposer has famiRarized himselflherself wnh the nature ~nd extent of the Contract Docurnetlts, Work,
site. locality. and aI/local conditions and law and Regulations that in any manner may affect cost. progress,
performance, or furnishing of the Work.
1.2.3. The Proposer has studied carefulfy all reports and drawings of subsurface conditions and drawings {)f
physical conditions if appficable.
7.2.4. 0 The Proposer has obtained and carefuRy studied (or assumes responsibilky for obtainitg and carefulfy
stlIdying) all such examilations. investigations, explorations, tests and studies that pertain to the subsurface
or physical conditions at the site or othelWise may affect the oost, progress. performance, or fumishing of
the Worle at the Contract Price. within the Contract TllTle and In accordance with the other terms and
conartioos of the Contract Documents, and no additional examilations, investigations, explarations, tests,
reports or similar information or data are or wll be required by Proposer for StIch purposes.
7.2_5. Proposer has reviewed and checked aN information and data shown or indicated on the Contract
Documents with resped to existing above ground and undergroWld tltilities at or continuous to the site and
assumes responsibility for the accurate location of said above ground and underground utilities, No
additional examinations, investigations, exploratKms, tests. report or simUar informatlOl1 or data in respect of
said above groond or underground utilities are or will be required by Proposer In order to pet10rm and
fumisl1 the Work at the Contract Price, within the Contract Time and in arxordance wifh olht!r terms and
conditions of the Contract Documents.
37