Loading...
HomeMy WebLinkAboutDRC o o o DRC Emergency Services, LLC 740 Museum Drive. Mobile, Alabama 36608 1-888-721-4372 . 1-251-343-3581 . FAX 1-251-343-5554 August 8, 2008 R 0-- q..\r AUG 1 2 2008 \\).~ City of Sunny Isles Beach Office of the City Clerk-Fourth Floor 18070 Collins Avenue Sunny Isles Beach, FL 33160 Re: Request for Proposal Submission RFP No. 08-07-01 Dear Sir or Madam, ORC Emergency Services is pleased to submit this proposal for services and materials as required for recovery in the event of a disaster occurring in Sunny Isles Beach, Florida. Mark Stafford. Chief Operating Officer and contact person, is authorized to legally bind DRC Emergency Services, LLC to any potential contract. DRC "hereby holds the City harmless and agrees to indemnify City and covenants not to sue the City by virtue of such rescission." DRC takes no exceptions to the requirements stated in the request for proposals. DRC acknowledges miscellaneous conditions 4.33.1, 4.33.2, 4.33.3, 4.33.4 listed on pages 21-22. ORC Emergency Services, LLC (ORC ES), part of the ORC Group (ORe), is among the leading disaster management companies in the United States. DRC Emergency Services has been conducting business under its present name since 2001. The primary mission of DRC ES is professional, honest, and immediate response to natural and man-made disasters throughout the world. ORC has extensive experience and capabilities in emergency response and recovery. Since 1989, the ORC family of companies has responded to nearly 60 natural or man-made disaster events involving hundreds of contracts. To date, we have removed in excess of 30,000,000 cubic yards of debris. During the 2004 Hurricane season alone, ORC worked approximately 37 virtually simultaneous, separate contracts performing a total of over $150,000,000 in emergency work, and recovering over 10,000,000 cubic yards of debris in a four and half month period. ORC also recovered, screened and restored tens of thousands of cubic yards of displaced sand and debris to restore 15 miles of beaches destroyed in Florida in the aftermath of Hurricane Ivan. During 2005 and 2006, the ORC family of companies worked on damages from Hurricanes Katrina, Rita and Wilma from the Florida Keys to Louisiana all the way to Houston, Texas. Because of ORC Emergency Services, LLC extensive experience with disaster debris removal, the proposer understands the work to be done. The following proposal will outline how our experience, qualifications, and approach make us uniquely suited to assist Sunny Isles Beach, Florida, with disaster recovery services generated by Page 3 o disaster events. The proposal is in all respects fair and in good faith and without collusion or fraud and conforms to the specifications of your invitation to bid. Please let us know if we may provide further information. Sincerely, Mark Stafford ~hi~~ Officer - o o Page 3 o o o ~ UNANIMOUS WRITTEN CONSENT OF SPECIAL MEETING OF THE MEMBERS DRC EMERGENCY SERVICES, LLC HELD ON THE 24th DAY OF MAY, 2007. The undersigned, being the Members of record ofDRC EMERGENCY SERVICES, LLC., unanimously agree, in writing, to the following actions of a special meeting of all the Members. This unanimous written consent shall be filed with Minutes of the of the limited liability company and shall have like force and effect as if the resolutions and actions taken herein had been duly adopted at a special meeting of the Members of the limited liability company with all such members being present. The following resolution is hereby unanimously adopted: BE IT RESOLVED, that T. MARK STAFFORD, as COO ofDRC EMERGENCY SERVICES, LLC, is authorized to negotiate and execute all proposals and bids on behalf ofDRC EMERGENCY SERVICES, LLC. IN WITNESS WHEREOF, the undersigned, being Members ofDRC EMERGENCY SERVICES, LLC, have hereunto set our hands on this the 24m (SEAL) a.... ...."",..4 7ft.a-ry ~ (SEAL) THOMAS M. MARR, SR., Administrative Manager THE MERRI LYNN CAIN 2006 REVOCABLE TRUST sa P.(h4 h ~ k (SEAL) THOMAS M. MARR, SR., Its Trustee o THE JAMES BRUCE MARR 2006 REVOCABLE TRUST BY~,-<.-ea., ~ 7!u--rvN(SEAL) OMAS M. MARR, SR., Its Trustee THE TARA JANE MARR WOODFIN 2006 REVOCABLE TRUST BY~~~-'-"-<J lh ~f,,{SEAL) OMAS M. MARR, SR., Its Trustee THE GINA RENEE MARR TAYLOR 2006 REVOCABLE TRUST BY:~A ~ ~ W(SEAL) THOMAS M. MARR, SR., Its Trustee 10 THE THOMAS M. MARR, JR. 2006 REVOCABLE TRUST BY:~..ard. ~ lJrfYT WiSEAL) THOMAS M. MARR, SR., Its Trustee THE RALPH SCOTT SHIRAH 2006 REVOCABLE TRUST BY: {)]4fL{ p-eJtA 7Jt f11/vY H (SEAL) THOMAS M. MARR, SR., Its Trustee c . I 10 1. PROPOSAL RESPONSE SHEET/FEE SCHEDULE FORM/PROPOSAL SPECIFICATIONS 2. PROPOSAL SECURITY 3. CERTIFICATE OF INSURANCE 4. CERTIFICATE FROM SECRETARY OF STATE OF FLORIDA 5. LOCAL BUSINESS TAX (OCCUPATIONAL BUSINESS LICENSE) 6. PROPOSER QUALIFICATION STATEMENT 7. NON-COLLUSION AFFIDAVIT 8. NON-KICKBACK AFFIDAVIT 9. PUBLIC ENTITY CRIMES SWORN STATEMENT 10. ACKNOWLEDGEMENT OF CONFORMANCE WITH OSHA STANDARDS 11. EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT 12. CONFICT OF INTEREST STATEMENT 13. DISPUTE DISCLOSURE FORM 14. RFP CHECKLIST o 15. GENERAL OPERATIONS PLAN 16. APPROACH TO SUBCONTRACTING 17. DESCRIPTION OF ACCOUNTING AND FINANCIAL CONTROLS 18. KEY PERSONNEL 19. PENDING LITIGATION o o o (} SECTION 7 PROPOSAL RESPONSE SHEET I QUALIFICATIONS I FEE SCHEDULE FORM City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RFP No. 08-07-01 for Emergency Debris Clearing and Removal Operations The undersigned Proposer proposes and agrees, if this RFP is accepted, to enter into an agreement with The City of Sunny Isles Beach in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this RFP and in accordance with the other terms and conditions of the Contract Documents. 7.1. The Proposer accepts all of the terms and conditions of the Advertisement or RFP and Instructions to Proposers, including without limitation those dealing with the disposition of Bid Security. This proposal will remain subject to acceptance for 90 days after the day of proposal opening. The Proposer agrees to sign and submit the Agreement with the Bonds and other documents required by the RFP Requirements within ten (10) days after the date of the City's Notice of Award. 7.2. In submitting this proposal, the Proposer represents, as more fully set forth in the Agreement, that: 7.2.1. Proposer has examined copies of all the Proposal Documents and of the following Addenda (receipt of all which is hereby acknowledged.) Addendum No. Dated: Addendum No. Dated: Addendum No. Dated: Addendum No. Dated: 7.2.2. The Proposer has familiarized himselflherself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. 7.2.3. The Proposer has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions if applicable. 7.2.4. The Proposer has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies that pertain to the subsurface or physical conditions at the site or otherwise may affect the cost, progress, performance, or furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, and no additional examinations, investigations, explorations, tests, reports or similar information or data are or will be required by Proposer for such purposes. 7.2.5. Proposer has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing above ground and underground utilities at or continuous to the site and assumes responsibility for the accurate location of said above ground and underground utilities. No additional examinations, investigations, explorations, tests, report or similar information or data in respect of said above ground or underground utilities are or will be required by Proposer in order to perform and furnish the Work at the Contract Price, within the Contract Time and in accordance with other terms and conditions of the Contract Documents. 37 jC I 7.2.6. The Proposer has correlatecl the results of all such observations, examinations, investigations, explorations, tests, reports, and studies with the terms and conditions of the Contract Documents. 10 7.2.7. The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. 7.2.8. This proposal is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation. The Proposer has not directly or indirectly induced or solicited any other Proposer to submit a false or sham proposal; the Proposer has not solic~ed or inducecl any person, firm or corporation to refrain from proposing; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposer or over the City. 7.3. The Proposer understands and agrees that the proposal is for time and material and un~ prices to clear and remove debris generatecl by a hurricane, tornado, or other natural or man-made debris generating event. Estimates are provided for the purposes of Proposal Evaluation and to establish unit prices for individual Work Items to be contracted by the City under individual Task Orders, based on the time and material and/or unit prices establishecl under this proposal. The City and the successful Proposer will establish completion times for each individual Task Order and the successful Proposer agrees that the work will be completed within the time frames agreecl upon and stipulated in the individual Task Orders and/or Notice to Proceed. 7.4. Communications concerning this Proposal shall be addressed to: Proposer Name: DRC Emergency Services LLC Address: 740 Museum Drive Mobile Alabama 36608 Telephone ? I) 1 - 14 1- 11) R 1 Fax 2 S 1 - 1 4 1- I) S I) 4 Attention: Mark sta fford 7.5. The terms used in this proposal which are defined in the General Conditions of the Contract included as part of the Contract documents have the meanings assigned to them in the General Conditions. 7.6. QUALIFICATION 7.1i 1. Contractors will be evaluated for this project based on 8 two-step process. Step I. Contractors roost demonstrate !hat they satisfy Mandatory Qualification as outIinecl in Section 3, Section 4 and Section 9. All proposals wiD be screened for COOlpliance with mandatory qualification elements, such as the required statements of compliance. Those that satisfactorily complete that screening process will proceed to Step II. Step II. Contractors will be evaluated in accordance w~h the criteria set forth in Section 62.8 of the City Code. The contract will be awarded by the City to the lowest responsible and responsive proposer who proposal best serves the interests of, and represents the best value to, the City pursuant to the criteria set forth in Section 62-8 of the City Code. Price is only a factor in determining the lowest responsible and responsive proposer. Genera 7.6.2. o The City of Sunny Isles Beach intends to enter into a pre-positioned contract with at least one prime Contractor who may utilize both local and non-local resources to provide services in the event of activation by the City following a hurricane, tomado or other natural or man-made disaster. The period of the contract will be 38 o for three (3) years with two (2) one (1) year options for a total of five (5) years with an annual re- certification and price adjustment based on 80% of the Consumer Price Index for the Greater Miami-Dade County Area. The project consists of post-disaster debris management within the City limits in two parts. · Part 1 is "Debris Clearance (for access) from Public Rights-of-way and Public Property,. consisting of only pushing debris from the traveled way of city streets and public fadlities to open one lane for emergency vehicles. This work will be performed on a Time and Material price bases limited to no more than 70 hours of actual work. · Part 2 is "Debris Removal Operations," consisting of loading and haufing debris from pubrlC rights-of-way to an approved landfill. This work will be performed on a Untt Price bases documented by valid load tickets. When identifying resources to be made available under this contract, Contractor shall use a planning standard approach. Specifically, Contractor must identify the expected sources and quantities/numbers of equipment and personnel that will be engaged. Contractor must identify sufficient resources to ensure the avaiability of personnel and equipment as necessary to initiate all r~ired activities within 24 hours of being so directed and any adcitional resources that might be necessary to have all required actions completed within the time frames specified heren. For the purpose of identification of Contractor/Subcontractors a general equipmenVpersonnel inventory win suffice. For Subcontractors, a statement of their commitment to provide resources for this project must be induded in the submittal. The planning standard to be used is removal and disposal of approximately 40,000 cubic yards of mixed debris wittln a prescribed operating perbd of not more than 30 days. 7.7. SEE SECTION 3, INSTRUCTIONS TO PROPOSER FOR PROPOSAL PROCESS, SECTION 4, GENERAL PROVISIONS, and SECTION 9, PROPOSER QUALIFIER STATEMENT 7.8. EVALUATION OF PROPOSALS 7.8.1. Potential Contractors will be evaluated for the project based on evidence and statements of compfiancelintent provided in their Proposals. First, the City wiD determine which Contractors are capable of entering into a contract with the City by satisfying Mandatory Qualification and as ouUined in Section 3, Section 4, and Section 9 thus making them eligible for consideration. Then, the City will determine which eligible Contractors satisfy the Project Requirements, thus deeming them qualified for the project. Only quafified Contractors will move on to the second stage of the evaluation, Le. consideration of their Project Approach and Fee Proposals for the services described by this RFP package. 7 B2. The City reserves the right to deny consideration to any Cootractor that does not satisfy the Mandatory QualifK:atjon Criteria or is na capable of satisfying the Project Requirements. However. the City may waive defects, irregularities or informalities in the qualification process or in any response to the process that, in the City's opinion, seems advantageous to the City and in the best interest of the public. o o 39 o 7.9. STANDARD SPECIRCATIONS FOR DEBRIS REMOVAL 7.9.1. Scope of Wolte Work consists of hurricane, tornado or major disaster debris clearing and removal from pli>lic property and the public rights-of-way within the City rmits and proper disposal of the debris. The work consists of loading and hauling debris from public rights-of-way to an approved landfill. 7S2. Preparedness: Key personnel, proposed by the ContrcQ)r under the pnHjUafification process, must participate in the City's annual disaster preparedness training activities, a maximum of two (2) days each year at no cost to the City. 7.9.3. Prepositioning: Upon activation of the contract, contractor must provide a two-person management team on-site within 12 hours of receipt of the Notice to Proceed. The purpose is to initiate actions necessary to ensure that contractor resources will be able to begin recf1t/ery operations within 24 hours of receiving the Notice to Proceed from the City. 7.9.4. Inspection of Debris: As soon as possible after the disaster event has subsided, the Contractor must make a detailed and thorough on-site inspection of debris to be removed, and consider (1) amounts and types of debris; (2) working conditions such as traffic, streeVroad width, and land use; (3) means to ingress and egress to work areas; and (4) all other factors affecting the removal and disposal work. 7.9.5. Coordination: Debris removal is limned to that which is detennined by the City Debris Manager to be in the best public interest and that which is considered essential to the economic recovery of the affected area. The City Debris Manager will detennine priorities for debris removal. The Contractor must coordinate closely with and take direction from the City Debris Manager. The Contractor must coordnate with other contractors and other public and private entities also perfonning recovery operations. 7.9.6. City Umits: Work is limited to specified areas within the Qty of Sunny Isles Beach. 7.9.7 Quality Assurance: Work will be closely monitored by City personnel, and/or its desiglee. The Cootractor must cooperate with all monitors representing the City and the Federal Emergency Management Arplcy (FEMA). 7.10. DEBRIS REMOVAL 7.10.1. General: The goal of the debris removal work is to clear, load, and haul debris from public property and the public rights-of-way to an approved landfill. In general, but not exclusively, this consists of curbside debris removal on City property. The types of debris to be removed include, but are not limited to trees, woody debris, brush, buiking wreckage, construction and demorrtion debris (C&D), and personal property and household goods 00 pli>lic property or in public righ~-way. Hazardous materials are not covered by this scope of wor1t 7.1Q2. PreparatlonlSubmlttal: Prior to commencing any removal work, the beds of all hauling vehicles must be measured to detennine their fully loaded capacities. All measurements must be made by a joint City or ~s designee/Contractor team. The vehicles must be marked extemaBy with the owner/operator's name, the contract number, vehicle ID ntlllber and the fully loaded capacity. Those markings must be clearly visible on both sides of the vehicle. Those markings must be placed on both sides and the front wall of the bed. MaI1<ings must be certified by the City or its designee and Cootractor. A rlSt of all vehicles, with the ONner/operator's name, vehicle ID number and hauling capacity must be submitted to the City Debris Manager before the vehicles are placed in service. The City will provide five (5) part load tickets tor each vehicle at each debris loading site. The load tickets must be presented to the City's monitor at the designated disposal site. 7.1Q3. Hazardous Materials: Hazardous and toxic wastes will be loaded, hauled, and disposed of by others and are excluded from this work. The City may execute a separate hazardous materials removal and disposal contract; however, collection schedules may not necessarily coincide with the debris removal work. Hazardous materials include chemicals, petroleum products, paint products, asbestos, power transformers, oxygen bottles, propane tanks, batteries, industrial and agricultural chemicals, cleaning agents and similar hazardous, dangerous or toxic materials. Some prelininary curbside separation will be attempted, but contractor must be aware that hazardous materials might be commingled with debris. Contractor shan take every precaution to avoid loading and hauling hazardous materials. Notwithstanding, contractor forces must be aware of the o o 40 c appropriate safety precautions. Further, Contractor will be responsible for safe and proper hanc:ling of any hazardous materials inadvertently loaded by contractor forces. Contractor forces must notify the City Debris Manager of kx:ations where hazardous materiaJs are en::ountered. 7.10.4. Other Non-Collection Items: The following items must not be removed or hauled to the designated disposal sites: · Household putresable garbage · Electric company transformers, poles and other equipment and materials · Telephone company transfonners, poles and other equipment and materials · Traffic signs. signals. and appurtenances · Debris on private property · Vehicles, boats and trailers · Household Hazardous Waste Curbside coIectioo of household putrescble garbage wiI be handed by the usual putjic and private haulers. Household garbage must not be mixed with stonn debris. All utility equipment, traffic signs and signals that are encountered must be moved to a visible. accessible location at or near curbside for disposition by utility companies or the City. Privately owned vehicles may not be moved by the Contractor. The Contractor will advise the City Debris Manager accordingly when removal of vehicles is necessary to continue debris removal operations. 7.10.5. Debris Removal: During debris removal operations, extreme caution must be exercised by the Contractor to ensure that no damage is done to public or private properties. Tracked vehicles may not be operated on paved surfaces. 7.10.6. Loading: All loose debris, such as tree limbs, must be reasonably compacted on the hauling vehicles ciJrilg loading. All debris extending beyond the vehicle in any horizontal direction must be cut off or otherwise removed. 7.10.7. Hauling: All vehicles utilized in hauUng debris must be equ"ped with adequate means for containilg the load, including canvas covering while transporting the debris to the landfill. Covering must effectively prevent debris from being blown or bounced off the vehicles. Sideboards or other extensions to the bed will be pennitted provided they meet state and local requirements, cover front, back, and two sides, and are substan1iaJ1y constnded. Sideboards must be constructed of 2" x 6"lunt>er or greater and may extend no more than two (2) feet beyond the metal bed sides. Vehicles must be equipped with a tailgate or other devices that will effectively contain the debris on the vehicle wh~e hauling, and also permit the vehicle to be loaded to capacity. 7.10.8. Dumping: All debris must be hauled to an approved landfill. The Contractor must make every effort possible to separate trees, woody debris, and brush fran other types of debris at curbside. All trees, woody debris. and brush will be accepted at the designated landfill. Construction and demolition debris must be similarly segregated and transported. 7.10.9. Equipment Storage: The Contractor is responsible for locating areas where hislher equipment may be stored, serviced and repaired and coordinating with the City n said location is in the City limits. Such areas must not be located within rights-of-way or in any areas that would impact traffic flow or produce a safety hazard. This does not preclude par1<ing equipment for short periods of time, including overnight, in right-of-way areas where work is in progress; on-site refueling and operating checks including da~y maintenance wm be allowed. o o 41 o 7.11. SCHEDULE 7.11.1. Removal Operations: Must begin within 24 hours of receMng the Notice-to-Proceed and be flrlctioning at 100% of capacity within 2 days. Removal may begin ear1ier if adequate disposal snes are available and property prepared. The City reserves the right to increase or decrease the scope of the removal activity as helshe deems necessary to ensure effective management of the overall debris removaVdisposaJ operations. 7.112. Working Hours: Unless otherwise pennitted by the City, working hours for removal operatioos shall be limited to daylight hours. 7.12. EXTRA WORK At the City's option, the scope of work may be expanded to include Federal Aid System roadwyays, public parks, other recreational areas, drainage structures, and channels. 7.13. UNIT PRICE PER CUBIC YARD OR TON BASIS OF MEASUREMENT AND PAYMENT 7.13.1. Debris removal will be paid for on the basis of a un~ price per cubic yard or by the ton for all debris loaded, hauled, and dumped at an approved landfill. The un~ price per cubic yard or ton must include all subsidiary costs, including but not Iimtted to labor, equipment, fuel, maintenance, general administration, and overhead and profit. Compensation will be based solely on the voIlJTle d debris haued as <b:umented ~ rompIeted load tickets actninistered and validated by City monitors. 7.13.2. The following conversion fadors wiD be used to convert from cubic yards to tons unless material is weighed at certified scales, in which case, the net weight of the materials shall prevail: · Mixed Debris. Vegetation and Construction & Demolition = 500 LBS/CY or CY x 0.25 = Tons · Yard Vegetation - Soft Wood = 333.33 LBS/CY or CY x 0.167 = Tons · Yard Vegetation - Hard Wood = 500 LBS/CY or CY x 0.25 = Tons · Construction & Demolition = 1000 LBS/CY or CY x 0.5 = Tons · Mulch = 1000 LBS/Cy or CY x 0.5 = Tons · Regular Trash = 300 LBS/CY or CY x 0.15 = Tons · Concrete = 2000 LBS/CY or CY x 1.0 = Tons · Sand = 2600 LBS/CY or CY x 1.3 = Tons 10 I I I I I o 42 .e '0 o rn z o ~ II: w a. o ~ ~ ==:::E II:~.- ~c~ ~:i~ :::::),,~ Cz . w-o :t:lI:z (.)c(a. rnwlL w....a:: w(.) lLrn ii: lEI W C ~ Z W " II: W :::E w ::IE II: ~ W .... :;:) Q W :t: (.) rn w w u.. ~ .- ...: en 'E: it 'g ~ 's '0 ! ~ ~ ,..: 'g c CIS en 'E: it '1::J 1 E '0 'E J. o :a :s o ~ fi .. .2 ~ c 1:5 '0: A. :t:: C :::::) I c( ~ c( A. I :s c o '0 ~ ~ ~ ~ 8 @ ~ ~ 8 ~ g ~ ~ ~ 8 'E: a. - C :::::) ~ a: a:~ ~ 1.0 co 1.0 co ~ O'\z ~ Ozl"- ~ ~ 0'\ >- ~ :t:: C :::::) en z ~ ~ en z ~ ~ ~ 1: ! (7 :w :w .c .c 8~ ~~ ~ -g ,..:-g )( )( ~ ~ .~ 8~ ~'i .!S ~ :w .c 8lD 00 ,..:-g .!S ~ c o a i cb '3~ l!! 00 >,r::: lD eGlD lD eGO .r; .c=..c::. _eGQ... 3: - - '0 E'" ~ tii ~ .15 -~ Cii a~ Cii .1-8='0= o~ "0 >,~ "0 E CIll!!- !~ ~ ~~ ~ ::;~~~~ a:'E 8. '0.2. 8. ia'O~@ ~ ~ E ! f E 1! ~~::- fa CIO~-= 8 a:eG 8 S'lii'O~= C 0 CIl CIl CIl _ lDEl!! .0 "i 0 :l!i1 "i S :l!i1 ... S 'U IU !2 J= E 'E- E 'a .c IU .- E oS; ...... .Ei C g Cl."O ~~ ~ s~ ~ .G)E.s;~ o 'iij U - .~ 0 - I ~ CD 8 13.c - E&f ~ E;: 0 E~E'5U; lJ...- CIl ......... ~ .a0~....:::J OO~"i'lD 0 lD (/)CD .mE e ~ O.sl ~ i~ ~ - '" ~~ CIl .: o..lDlD 'n lD oS'!> 0.. C g. ~ .c .S; 0 ~ .~ 1-.if ~ fa !3 'Ect'O......13 .ctco 13. ~8~Ci5 lUuS~=@'QCIl =@' C"'lD. 'ii = IU 0 E .:..... 0 _ E . JQ eG lD ~_ ~ .g .~z ~ E '9.f1 ~ ~ E c ~ ~ s '"2 1;a..l3lD~lDQ.,OlD~lD'EOO"O~ iiE"O~cb~E"i.ccb:::.EClaCl a:elU-6~eCii"""6~'iil!!~"OlD~ CI)'Q.O....:.,f:;'Og.r:::~:€'O>...:i5lD= ]5 ~ ~ ~ .~ ~ tj .r Oz .~ ~ ~ ~ ~ ~ Ee [ ! ~.r; E ~ 5 0: "0 lD B. 5 ~ w.c g._ ~ O_"O~~2NIU~~2o_"O_~= ......~fa~c~~2_c~NNag~~ .....: .. .. 'coo 0 coo 0 . . . coo N co Lt') co ('; (V) ~ 'fi'fi'fi'fi IUIUIU~ yJWW ~~~ $ $ $ $ - .... .... .... ................ (V) 'I:t 810100 ......f'o-C\IIO C\I 'i -:,. fa ~~ = lD 0 '- '8:8 ~ ~C'II l!! >.~ I:D ~~ I 'Om 0) CIl lD C .E~ .~ ~g jg .le! ~ CIl :ZScoCi),- 6 cfC'!Gi-m...'P ......EElDCU ~.,f:;.!lleG1!:;j oS; g 't:I '6 Cil .r; S e 'fi 'fi .- '0 .; = .Ei c ~ "'iii e:;~m~& g> en ~ ....: s .12 .QE "<t"O"O": ClllDOoC't:IS '2~ii~~liil'4 UlDEiUU-1O .!!! -g. .s;.s; ~ '6 Q.:::J~~~ ~.s; 11~ lD l3 50. a:'fi Ci5 .8 ~ .s; Q c ~ .2 ! ~ ~ W N rl I co 1.0 . N ..-- ~ VJ ~I ~ I 0 8 ... 'i cu co 'gss ~s-g c:-g:; .gEjg ..!!!::;,~ .~~= .l:J -c 'i C\I ~C:(I)~ co_.... .~~ 0 "B G) eCi)_ IcoC:"'~ a:~~~e CJ>>~ cu cu Cco -cu"'" C!-c:........ 'Bucu J ii 'g ~ ~ -8_2:2 lrs j :g 'g III 5 COij-c c.- c:... c: o ti .~ ~ co j ~ -8 &1g - -c co.l!:! fa ofaO.l:J- i-~~-g co~ ca c'l ~ ~ .c .g E.c u. ~&!.8-*~ o o lfZ .... a .... ~~ Iii ... ~ lii.e ~& lii CIl """ ~ ~ ~. Q.~ :Q c: :8{ i~ ;, Kl!! j &.-8 '5- '" ~ ~i G> ~ !5~ gi's .! =.9 ._ .0 l~ 'iii ts'i ~ ~~ II) ..'C e> CIl~ glii .Ii 2.0 ll~ ~ ~~ ~~ .a 'E S,; ~6- '" ts-i 'SCIl D ~1- .o~~ .Ii i~ .~1l j '3 ..l!! -g.~ ~ 4! ~ ~ Q.~ <=- c: .- CIl "' ] I!! 8 JIl=-B CIlQ. .! s:: "' 11 '8E s~1ii ~bi ~ ~.6 c CIl i;-,2l 'C~b E Iii",,]! ~ je> coe 9.6 r;;l G>-S '2 JIJ~~ K ~.B "' :g,i = li~ II) oW E:5 :a CD 25... -:. ;g 'C &..!l! Z I!! . 'iii CIlB.O .0 l! f E =l!!.. ~.- 0 IS ... rI.l 8.i' c: .el:ll:l ;, ~ .! 'i C\! ~ ;:O:gi g u .... Iii ~:e l! ~to ..- ~ I!! ~ CD 1 ~5 j l!! -a .8'5:j! =::: .!l! S .....;g fl~ 1l tCll z:; e!8J '1 ~ S. rI.l ~~. .!!i o~ :a CIl -1lI~ N - ~.b . ~ .~ ~ sl!5~ !.:e 'iij'fagi ~ "' ;, Ql8.~ iiiCD ~ "5= "9!", Ii ~ 6- ~ :! gi] t 'E'i ~~-!l ji fs 'i Q. gi .~ f~ ~li~ "E::S- -a ... 0 'G) ~! .6 'iij~ .~ ~:B I '15e ~.~~ 'iilQ.. I~-e ~ ~~ -Jli~ ! ~S c: CIl '" 'Cas =:.2 c: j a'~ ~ .", Q.. ~e> 'iilCll i1. !. ~ i. ~~ 'El~ CIl'1j ~...o cnC'j a:._ 0 . .... coj~ ~.~l C\I~ ~e> sf a!.&. a~ zl!! z= ZQ. I ~ ,... ~ .. .. ~ C'I C'I - - - - ~ C'I C'I CO) .. ~ ~ "= 0> ,... C'I "Cl:! J! ~ lEi g) &l ~ .... ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ..,. ~ ~lll t') ..,. ~ Ii .c ,~ .. tl ~ iC N 16 <1i 18 18 ,... 18 m R ;::: ~ t') t! Ie Ie f::: ~ ~ 2 CD N ~~ ~ '" '" ,... co J co ! CD t') co t') co ~ 0> "l ~ ~ ~ ~ U) C'I co "l ~ 01 Ul .. ~ 01 ,... ~ ~ .... 0> U ,..: eD eD .,; .,; ~ ~ - ~ 't. ~ ~ ~ t:: ~ ~ fia l\i gJ ~~ :a - 8 Ii .c u loS I ~~ ~ ~l:; ~m ~; Nt') ~lI;! ~ ,... ~ ~lll -N ~11i 1Sl8 ,... :g~ Ej .... .... .... U) U) U) I~ E ii J ~.. U) '" "=01 -~ ~~ CD .... t') C&:> O!C>! U) co -"l G:!C'I ::}fD U) 0> ~ :B 00 00 00 "';C\l C\lC\l Nt') ..s..s ..~ ~U) eDeD ,... 8 J i '" ,... "" 0> ~:: ~~ .... U) ~~ ~~ ~N ~~ ctitQ ~l\i ~FJ ~c;:; ~ -- .. a J ; o Part B - Hourty Prices o EaulDment and Labor Rates Equipment Type Typical Hourly Hourly Total Clearing Equipment Labor Hourly Crew Rate Rate Rate MakeuD Bobcat loader X ~30 00 19;40.00 '$70.00 Bucket Truck <tQt:; nn 1<tL1.n 00 !~135 00 ChiDoer/Mulcher (8" throat) $100 00 $40.00 $140.00 ChipperlMulcher (12" throat) <l:1?n nn 1<l:4n 00 i160 00 Crew Foreman w/Cell Phone and Pickuo v d"')t:: (\(\ 1<1:40 00 ui65.00 Dump Truck, 18 CY.20 CY ~~n nn 1<1:40 00 $70 00 Dump Truck, 21 CY.30 CY <l:4n nn k4n 00 $80 00 Grader w/1'l Blade $100 00 1$40.00 $140.00 HYdraulic Excavator, 1.5 CY ~1nn nn 19;40 00 1$140.00 Hvdraulic Excavator, 2.5 CY ~110 00 19;40 00 $150.00 Knuckleboom loader <1100 00 ,$40.00 <l:14n 00 laborer w/Chaln Saw 2X <15_ 00 30.00 $35.00 laborer w/small tools, traffic control, f1aa person g 5;;; 0 0 :j 30.00 $35.00 lowboY Trailer wlTractor <I:?t:; nn <l:4n nn 9;fiS 00 Mobile Crane (AdeQuate for hanalna Iimbslleanina trees) $120 00 $40.00 $160.00 Operations Manager w/Cell Phone and Pickup $25.00 $40.00 $-65.00 Pickup Truck, 1/2 Ton <t?t:; nn <l:n nn 0s 00 TraffIC Control, Temporarv Sinale lane Closure t:; nn ?t:; nn ~10 00 Tree Climber s/Chainsaw 1n nn ;qc; no $105 00 Wheel loader 2.5 CY 950 or similar 100 00 40.00 ~140 00 Wheel Loader 3.5 - 4.0 CY, 966 or similar <l:1?n nn <l:4n no ~1hfll00r Wheel Loader, 4.5 CY, 980 or simBar $140.00 $40.00 $180.00 Wheel Loader.Backhoe, 1.0 -1.5 CY <l:An nn 9;40 00 9;120.00 Other - Please Ust Fr.....nt- l<'nn T. -, V d"":l(\ nn <tL1.n nn <t7n nn Laborer X $30.00 $30.00 Notel: No1I1. Total nrne and Mlllrlal Prlcel lhalllnclude all labor (operators, 1abo1811, and aupervilOll), equipment and mIIIrlaIl lncIucllng but not limited to: luppllet, equipment maintenance, 11p111I, I8pIlr peril, fueIa, lubrlcanta, cellular phonel, tranaportatlon, traI!Ic controtand hoUllng, Ill8C(ulr8d, neceaury to accompnlh the project Noll 2. ldenllfy the EqUlpmentlPeraoMI' that COIlItItut8 a Typical Clearing CI8W In the column provided The Contractor will provide 10 (number) of crews dedicated to perform the Wort within the first 24 hours following Notice to Proceed. The Contractor will provide J) (number) of crews dedicated to perform the Work within the first 48 hours following Notice to Proceed. o 45 .... o SUBMITTED THIS 8th DAYOF August ,20 08 If PROPOSER is: AN INDIVIDUAL By: (Individual's Name) (SEAL) Doing business as: Business address: Phone No: Facsimile No: General Partner: Business address: Phone No: Facsimile No: ---_._----_.__.._-----_._--~_...._~-_...._..._---.__.-----.------------.---.-.---------.--.--------.-..----..--.--.-.....--- If PROPOSER is: A PA.~.IP '~f't\',.\-e d \', ""Ie.', y, ~ CD~A~ By: Mrlrk Srrlff()rn (Firm's Name) Managing Member-Robert J. Isakson 740 Museum Drive Mobile AL 36608 251-343-3581 251-343;5554 (SEAL) ------.......---------.-.---------.....------------.-..----.........-...-.......----..--------------------...--------------------------...--- If PROPOSER is: A CORPORATION Limi ted Liabi Ii ty Company.- o By: (Corporation's Name) State of Incorporation: Representative: (Name of Person Authorized to Sign) Title: Business address: Phone No: Facsimile No: Attest: (Corporate Seal) (President) Chief Operating Officer ------------..--..-------------------------------------.....-----...--------------.--...--.....-....--.....----.-..-...---- If PROPOSER is: A JOINT VENTURE (Name) (Address) (Name) (Address) (Each joint venture must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.) o DOCUMENT CONTINUES ON NEXT PAGE 46 ~.... o STATE OF Alal::am COUNTY OF M:>bile CERTIFICATE OF AUniORITY g (IF COIlf'OHAHON) IimitErlliability crnpgny I HEREBY CERTIFY that a meeting of the Board of Directors of the a corporation existing under the laws of the State of Alal::am , held on M:Jy 24 , 20--.ill...., the following resolution was duly passed and adopted: Chief Q:ffatioos Officer "RESOLVED, that, as rresid~t oHhe-6orporatiOlt, be and is hereby authorized to execute the Proposal dated, Agust 8 , 20~ , to the City of Sunny Isles Beach and this corporation and that their execution thereof, attested by the Secretary of the Corporation, and with the Corporate Seal affixed, shall be the official act and deed of this Corporation.. I further certify that said resolution is now in full force and effect. .IN WIT~ESS WHEREOF, I have here,4,Qto set my hand and affixed the official seal of the corporation this g , day of Pu2.illt , 2~. <<.) Secretary: ~~ (SEAL) DOCUMENT CONTINUES ON NEXT PAGE o 47 o o o SECTION 8 BID BOND (C(Q)f1f STATE OF FLORIDA COUNTY OF Miarri -D:de Comty KNOW ALL MEN BY THESE PRESENTS. that we, DRC EMERGENCY SERVICES, LLC as Principal, and SAFE CO TTIS11rATIrp Company of America , as Surety, are held and firmly bound unto the City of Sunny Isles Beach, a municipal corporation of the State of Ronda in the sum of Five Percent (5%) of the Amount Bid Dollars ($ ), lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the accompanying Bid dated, August 12, 2008 for: Emergency Debris Clearing and Removal Operatios, RFPff08.-07-01 WHEREAS, ft was a condition precedent to the submission of said Bid that a cashier's check or Bid Bond in the amount of five percent (5%) of the Base Bid be submitted with said Bid as a guarantee that the Proposer would, if awarded the Contract, enter into a written Contract with the City for the performance of said Contract, within ten (10) consecutive calendar days after written notice having been given of the Award of the Contract. NOW. THEREFORE, the conditions of this obligation are such thaI if the Principal within ten (10) consecutive calendar days after written notice of such acceptance, enters into a written Contract with the City of Sunny Isles Beach and furnishes the Perfonnance and Payment Bonds, satisfactory to the City, each in an amount equal to one hundred percent (100%) of the Contract Price, and provides all required Certificates of Insurance. then this obligation shall be void; otherwise the sum herein stated shall be due and payable to the City of Sunny Isles Beach and the Surety herein agrees to pay said sum immediately, upon demand of the City, in good and lawful money of the United States of America, as liquidated damages for failure thereat of said Principal. IN WITNESS WHEREOF, the above bonded parties have executed this instrument under their several seals this 12th day of August ,2008. the name and the corporate seal of each corporate party being hereto affixed and these presents being duly signed by its undersigned representative. DOCUMENT CONTINUES ON NEXT PAGE 50 o ~.~ POWER OF ATTORNEY Safeco Insurance Company of America General Insurance Company of America Safeco Plaza Seattle, WA 98185 KNOW ALL BY THESE PRESENTS: That SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA, each a Washington corporation, does each hereby appoint ........ .. .. KIMBERLY B. BARHUM; DAVID ROBIN FORTENBERRY; RICHARD TEB JONES; MARY JONES NORVAL; Hattiesburg, Mississippi; CHRIS BOONE; JOHN R. PITTMAN, SR.; SHARON TUTEN; Jackson, Mississippi; JIM E. BRASHIER; JILL G. EURE; TROY P. WAGENER; NORMA J. MCMAHON; LOREN RICHARD HOWELL, JR.; KATHLEEN SCARBOROUGH; Bilox!, Mississippi; SCOTT NAUGLE; JOHN B. SNEED; WAYNE TIDSALE; Gulfport, Mississippi. I ~~. IliA 11.4......... II II ....................."." 11"""..111 "",.. ..1111111111' II II 1111.41 .11....--.....-........................ No. 9958 its true and lawful attomey(s)-in-fact, with full authority to execute on its behalf fidelity and surety bonds or undertakings and other documents of a similar character issued in the course of its business, and to bind the respective company thereby. IN WITNESS WHEREOF, SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA have each executed and attested these presents February 2008 this 22nd day of ~'J{j4~ STEPHANIE DALEY.WATSON.SECRETARY \ArrW~~..a~ o TIM MIKOLAJEWSKl. SENIOR VlCE.PRESIDENT, SURETY CERTIFICATE Extract from the By-Laws of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA: "Article V, Section 13. - FIDELITY AND SURETY BONDS ... the President, any Vice President, the Secretary, and any Assistant Vice President appointed for that purpose by the officer in charge of surety operations, shall each have authority to appoint individuals as attomeys-in-fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety bonds and other documents of similar character issued by the company in the course of its business... On any instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond or undertaking of the company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced; provided, however, that the seal shall not be necessary to the validity of any such instrument or undertaking." Extract from a Resolution of the Board of Directors of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA adopted July 28,1970. "On any ,certificate executed by the Secretary or an assistant secretary of the Company setting out, (I) The provisions of Article V, Section 13 of the By-Laws, and (ii) A copy of the power-of-attomey appointment, executed pursuant thereto, and (Hi) Certifying that said power-of-attomey appointment is in full force and effect, the signature of the certifying officer may be by facsimile, and the seal of the Company may be a facsimile thereof.. I, Stephanie Daley-Watson , Secretary of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA, do hereby certify that the foregoing extracts of the By-Laws and of a Resolution of the Board of Directors of these corporations, and of a Power of Attomey issued pursuant thereto. are true and correct. and that both the By-Laws. the Resolution and the Power of Attomey are still in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the facsimile seal of said corporation this 12th day of August 2008 o ~.~~ STEPHANIE DALEY-WATSON, SECRETARY Safeco@ and the Safeco logo are registered trademari<s of Safeco Corporation. S-0974/0S 4/05 WEB PDF o o o IN PRESENCE OF: DRC EMERGENCY SERVICES, LLC 't1- 6:- ~ ~ I..&..-+.J. ls q. ~ So '" Individual or Partnership Principal Affix Corp~rate Seal 740 Museum Drive Business Address Mobile, AL 36608 City I Stater and Zip Code 251-343-3581 Business T e!ephone 251-343-5554 Business Facsimile rSTED: ~ , )o~~, ~ Secretary SAFECO Insurance Company of America (Corporate SUrety)' B~~g~ Loren Richard Howe , Jr., Attorney-in-Fac~ A IMPORTANT ~ODert r ey e'don Fj.sher-Brown Inc. POBox 711 Pensacnla FL .32501 . ~urety companies execUtfng bOnos must appear on me I reasury LJepartmentls most CUrrent list (drcular 570 as amended) and be authorized to transact business in the State of Florida. END OF SECTION CERTlFlCA TE OF INSURANCE NO 184 CERT1FJCA TE HOLDER NAMED INSURFJ:! CITY OF SUNNY. ISLES BEACH OFFT.CE OF THE CITY CLERK FOURTH FLOOR 18070 COLLINS AVENUE SUNNY ISLES BEACH, FL 33160 DRe. Inc., DRC Emergency ServicES. LLC 740 Museum Drive Mobile, AI. 16608 o NO o NO o NO o NO 01.\ ~1I policic:~ conr~il1 a Waivc:r of Slobrogadol1 in ravor of C:cni(icalc: Holder if required by \Urinen e(\n(racl'? Do ~II policies excepr (he WOrkl:T~' C(\tl\llen~ation n~me the Cenific~le Holder ~s ^d<.lilinnal 111.ured if rcqlo;rell by wrirlen conrrac(? Do policies pro vi lie 30 day~ wrirren nollce of cRncen~lion II) CerrificBre HCllr.ler? Is covernge llllder all in~llr~IT~e curriell by NalTlelllnsurcd Primary Insurance if required by ",riflen conrrncr: LIMliS OF LlABIJJTY IN CONFIRMATION TYPlo: OJ' INSURANCE POLICY POUCY THOUSANDS OF COVERAGE NUMBER PERrOD (000) WORKERS' COMPENSATION &. XSWC-071]529 OJ/OJ /2008 WORKERS COMPENSATION EMPJ~OYERS LIABILITY 03/011201 J ll. S. Longshoremen's ~l1cJ Harbor Workel'S EMPLOYERS LIABILITY ~ YES 0 NO F.~eh Accident .11,000 CompenSll~ion Ac( Coverllgc Disell^, . Policy Limit $ 1.0(l0 ~ YeS 0 NO OureT Continental Shelf Land ACt Di~case - Each Ernployee $ 1.000 IiSI YES 0 NO Jonc~ Acr (incl\lding TranWOf(~liol1_ Wagc.l. M~intenance. and Cure). Death 011 the tligh MARITIME EMPLOYERS Seas Act &. Gener~l Maritime L1W L1AB.IUTY $ 1,000 ~ YES 0 NO Voluntllry Compensalion Enrlorsement rnJ YES 0 NO Otller St~tes Insurance (3l YES 0 NO Altcm~te Employer/Borr(lwed Strvanr E.ndorsemem ~ YF.S 0 NO "In Rem" EndoT~emel)l [gIYES 0 NO Gul( of Mexico Territorial EXTension GF.NERAL LJABTUTY >tSGI...073197 03/01/2008 form & Edition Dllre ISO CG 0001 J 1188 03/0 1/2011 General Aj1.greg3te Unlimirecl ?rodum-Comp/OPS Agg, $ 3.000 Dll YF..s 0 NO BroRu Form Property Oamllge Liability PCr50nnl & Advcrtising Injllry .t 1.000 ineh,lding X. C. lJ I:.llch Occurrence $ 1,000 ~ YES 0 NO PrOdllc!S/Compkted Operation5 Fire DnlllJlge .$ 50 12!1 YES 0 NO COn[raClllRI Liability (Any I)ne fire) ~ YES 0 NO Sudden and Accidental PolhHion Liabiliry Meclic~1 Ellpem;e r, 5 !XI YES 0 NO Occurrence Form (Anyone person) ~ YES 0 NO Personal Injury ~ YES 0 NO "Tn Rem" Endorsemenr ~ YES 0 NO Cross Liability ~ YES 0 NO Watercrllft 1!:1l,CI\I~;On ha~ been modified by lhe \/c~sels endor$emen{ on SCheduled equipmcnr 08/08/2008 14:03 .~ 2519379591 BLACKMON INSURANCE PAGE 02/02 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ CONFIRM A TION OF COVERAGE LIMITS OF LIABILITY 1N THOUSANDS (000) lYPE OF INSURANCE POLICY NUMBER POLICY PERJOD .AUTOMOBILE UAR1UTY XSAJ,.Q72995 03/01/200R 03/01/2011 o NO o NO o NO o NO o NO BOdily Jnjl)ry & Propf:rty D~m~ge CClmbined .$ LOOO Any Auto All Owned Amos Schedulecl Autos Hircd Amos NOI\.Ownecl AllfO~ EXcr.sS l~I^BILITY GXS-Q<l2273 03/0112008 03/01/2009 EReh OceurrcnCf: . A/!,p:rcgRrc $ 4.000 $ -1,000 Excc~~ Form JOB OR PROJECT DESCRIPTJON SPECIAL CONDlTlONS Should the in.~lInncc herein described be cancelled. a~~ignecl or eh~ngecl in sl1ch a manner as to affccllhis cerrifie~te. THE GRAY ~SURANCE . COMPANY will cndcRvcr to give thirty ( 30 ) day!; written nOlice 10 Ihe certificate hnldcr. l'\1Il fuilure 10 do so shall Impose no ohligation or liability IIpon THE GRAY JNSURANCE COMPANY. dv~4i2 3601 N. 1-10 Servicc Ro~.d West. Metnirie. LA 70002 DAn:8-R-?n~B____ FORM NO. 13S REV. 1101 - .Gf c " u ~- u ~I . :..... ., . ,"""1;, St,!te.ofFlorida' Department of State . , I certify from the records. of this office thatDRC EMERGENCY SERVICES, LLC is a limited liability company organized under the . laws of Alabama, authorized to transact business in the State of Florida, . . qualified on July 18, 2095.. . . . The document number. of this .' limited liability M05000003946. . . . company IS I further certify that said limited liability company has paid all fees due. this. office through December 31, 2005, and its status is active. I further certify that said limited liability company has not filed a Certificate of Withdrawal. Given under my hand and the Grell! Sial of Florida, at Tallahassee, the Capital, this the Twentieth day of July, 2005' . . . .. "".\ltfv.ftfp.:~"~ ~"'<e '~~.J!.l:f~'~"" .... ...~,' ,./. "lI'.;;....:..->E f7 a. '. " . .,.--~- ',~", ~::...~....(". '~ ,~ "._~";:' "....." '_9""'''<~'' ~'''''l>;'-';;Si .T "''J ",' ::,~.. .::~~' ..., ,,~~-:- ':..,,6>):.. .. .~,. ~....~~r.. I "u - - "0.\/:,,"\0. . . ._. 'c-._L~- ."'- ".~f><' . '. '~. ",,""oi.'iJ>" ',- ;;.fi3:::i,~ . ' ,-.;.",~':"~ t ~:;%y,~~_r~~~~ .~V '.;:/./ r"7-L'f';:;,.>,~.'t':.i'.tN;J,' ....,~:.,:;'.~~1:,fs~~-7~~: . .~.~&~~: .',/> ,l..<......- .",.....' J. _. ...,-,,}\>. ..~;61.~.-;:%~: ,:. ,)~f~'~.~~.. ~;$~ff.. ..,,'..,....-,~ ~-Z.:.~,;.~~~/ LiA..f. fkd Secre~ary o/Stale' Authentication ID: 400057718744-072005-M05000003946 , . To authenticate this certificate,visit the folloWing site, enter this ID, and then follow the instructions displayed. . I www.sunbiz.org/auth.html r -......"'""""""'.----."'.""""-=~.........."........""""...=--=..."..-"..7..~"_=7..."'_""'"'n"...........~~::::..:.:~;~~:::,':'::..~~:::.."":::;.~;:.'::~ """"'-'<.r ...._~-.""----~~-,.i I If' I 1[, O '.' Nancy L. Worley P.O. Box 5616 /' I; ; Secretary of State Montgomery, AL 36103-5616 : " If f: ~ , , 1". "I' 11 II ;,i i I ['I I I /.1 01 I,' I , i ,i f i " II ;,i r I I, ~ t f I r: .., h if !.~ , . ! j i I: , I !:j r: - ! . i -, , I i: i" t/ r l: ~ " STATE OF ALABAMA I r [ . e r. t I. r t r , l I ~ ~ I k ~ I I< !.'II ~:::Sf~;e~ih:~~::~fs~a~:~et~:r;t:~:~ ::~:;Yc~~~:ol, I I., in the City of Montgomery, on this day. ~ ~ , ~ Ii June 26, 2006 I. I Date ! c;l ?Fz- pi( ~-, ! II Nancy L. Worle Secretary of State Jl ~-~_.~-~~~-'==>'CB""''''''''''''''''_''''~''-''~",,",,;'''' .,,",-<aLd I, Nancy L. Worley, Secretary of State of the State of Alabama, having custody of the Great and Principal Seal of said State, do hereby certify that foreign corporation the records file in this on office disclose that DRC, Inc. , South Carolina a corporation, qualified in the State of Alabama on October 30, 1992 and has adopted the fictitious of Disaster name Reconstruction Corporation, Inc. for in Alabama. use I further certify that the records do disclose not that said DRC, Inc. d/b/a Disaster Reconstruction Corporation, Inc. has been withdrawn. o o o SECTION 9 PROPOSER QUALIFICATION STATEMENT The Proposer's response to this questionnaire will be utilized as part of the City's overall Proposal Evaluation and Contractor selection. The undersigned guarantees, by signature, the truth and accuracy of all statements and the answers contained herein. 9.1. Please describe your company in detail. An international LLC, DRC is a '!')_ Debris Removal Company responding, primarily, to major disaster events. 9.2. The address of the principal place of business is: 740 Musem.-Drive Mobile AL 36608 9.3. Company telephone number: 251-343-3581 9.4. Number of employees: Approximately 50 to 60 9.5. Number of employees assigned to this project: 12-100 as necessitated by severity of events 9.6. Company's Identification Number(s) for the Internal Revenue Service: 631283729 9.7. Miami-Dade County and City of Sunny Isles Beach Occupational Ucense Number(s): ,;';,;'M.arri -Drle a:cur:?ticnal liCEnSe nnter: :i:fj)74-2 This liCEnSe niriEr is for me In:.. 9.8. How many years has your organization been in business? Seven years 9.9. What similar engagements is your company presently working on? If none, write Mnone". none 52 C) 9.10. Have you ever failed to complete any work awarded to you? If so, where and why? NO 9.11. The work described in this project is to occur within public right-of-ways, parks, public facilities, and buildings. Ust similar govemmental or quasi-govemmental projects for which you have completed or have on-going services. If none, write "none". PROJECT 1: Project NameILocation Please SEE atta:hErl referen:::e list for a::lli.ti<:xEl refererces Plaquem~nes Parrish, LA Owner Name pl-"l'll1pminp-s Parrish Contact Person Rilly Nungesser, President Contact Telephone No. C;04-?74-2460 Year1y BudgeVCost OUE"T $??,OOO,OOO Dates of contract From: May 2007 To: Present PROJECT 2: Project NameILocation LA Dept. of Environmental Quality LA OgEt; of Environmental Quality G Owner Name Contact Person John Rogers Contact Telephone No. Year1y Budget/Cost 225-219-3266 $1S,000,000 Dates of contract From: June 2006 To: Present PROJECT 3: Project NameILocation City of New Ore leans Owner Name City of Neew Orleans Contact Person Veronica White Contact Telephone No. 504-658-3800 Year1y BudgeVCost Date s of Contract $1R.000,000 From:May 2007 To: Present o 53 o 9.12. List the following information concerning all contracts in progress as of the date of submission of this Proposal. (In case of joint venture, list the information for all joint ventures.) If none, write "none". '1....>'l'>Please see tre atta:hErllist of all ffiC's current crntracts. Project Owner Total Contracted Percentage Name Contract Date of of Value Completion Completion (to date) 9.13. Has the Proposer or his/her representative inspected the public right-of-ways, parks, public facilities, and buildings; and does the Proposer have a complete plan for its performance? l:~ ani yes me has a plan for its 0J:ITEIl:e . 9.14. Will you Sub-Contract any part of this work? Yes If so, give details including a list of each Sub-Contractor that will perform work and the work that will be performed by each Sub-Contractor. o Classification of Work Name and Address of Sub-Contractor D=1::ris raroval CahatB Disaster FB::overy, llC 4619 Spirghill Averue 251-342-49:0 M:)bile,AI... '3:H:f3 D=1::ris raroval CD?,Irc 228-332-0238 Bay St. I..ruis, M3 3J52D o If, prior to Notice of the Award, the City or the Contractor has reasonable objection to and refuses to accept any Supplier, person or organization listed, the Proposer may, prior to Notice of Award, submit an acceptable substiMe without an increase in their fee price. 54 o c () CURRENT CONTRACTS OF ORC EMERGENCY SERVICES, LLC Estimated Completion Begin Entity Contract Value Date Work in Progress August Plaquemines Parish, Hurricane Katrina - Debris Approx. 29,2008 Mar-07 Louisiana Removal ROE $5,000,000.00 Work in Progress August Plaquemines Parish, Hurricane Katrina - Canal Approx. 29.2008 Jul-07 Louisiana Debris Removal $10,984,790.00 Work in Progress August Plaquemines Parish, Hurricane Katrina - Ditches Approx. 29,2008 Jul-07 Louisiana and Culverts $1,377,650.00 Hurricane Katrina- Work in Progress August Demolition of Flood Damaged Est. value 29,2008 Nov-07 City of New Orleans, LA Homes $15,000,000 Press and Louisa St. Wharves 90 days Demolition & Removal of Waiting on NTP from May-08 Port of New Orleans, LA Remaining Structures $1,609,855.00 NTP Structural Demolition, August Selective Salvage, Debris Work in Progress 29,2008 May-08 New Orleans, LA removal and Site Clean-up $3,543,293.80 Tomado Debris Recovery Work in Progress September June-08 Parkersburg, IA Contract $5,486,500.00 2008 Repairs to Hurricane Damage June, 2009 at Port Sulphur Govemment Work in Progress June-08 Plaquemines Parish, LA Building $3,676,593.00 Replacement of the District 8 Work in Progress June, 2009 June-08 Plaquemines Parish, LA Council Building $1,486,968.00 Work in Progress September Tomado Debris Management Est. value 2008 June-08 Macon, GA and Removal Services $1,500,000.00 o o c 9.15. State the name of your proposed staff supervisor and give details of hislher qualifications and experience in managing similar work. Paul F. Persons See resume at see tab 18 9.16. State the true, exact, correct and complete name of the partnership, corporation or trade name under which you do business and the address of the place of business. (If a corporation, state the name of the president and secretary. If a partnership, state the names of all partners. If a trade name, state the names of the individuals who do business under the trade name.) DRC Emergency Services, LLC. 740 Museum Drive Mobile AL 36608 Robert J. Isakson - -Managing Member Thomq.s ~Marr::Sr. - Me-mber - -.c. ~ '" 9.16.1. Correct name of the Proposer is: DRC Emergency Services, LLC 9.16.2. The business is a (Sole Proprietorship) (Partnership) (Corporation). Limited Liability COmpany 9.16.3. The names of the corporate officers, or partners, or individuals doing business under a trade name, are as follows: None 9.16.4. List all organizations which were predecessors to Proposer or in which the principals or officers of the Proposer were principals or officers. If none, write "none". DRC Inc. 9.17. List and describe all bankruptcy petitions (voluntary or involuntary) which have been filed by or against the Proposer, its parent or subsidiaries or predecessor organizations during the past five (5) years. Include In the description the disposition of each petition. If none, write "none". None 9.18. List and describe all successful Bid, Performance or Payment Bond claims made to your surety (ies) during the last three (3) years. The list and descriptions should include claims against the bond of the Proposer and its predecessor organization(s). If none, write "none". None 55 o o v 9.19. List all claims, arbitrations, administrative hearings and lawsuits brought by or against the Proposer or its predecessor organization(s) during the last three (3) years. The list shall include all case names; case, arbitration or hearing identification numbers; the name of the project. If none, write "none". Dated this ?S day of '^ IJ ~ oj ~ +- ,2008. ~ l-- Signature ~ Mark Stafford Print Name Chief Operating Officer Title The foregoing instrument was acknowledged before me this ~ day of ~\.A.:::, + , 2008 by ~~( e::.. Lo\) t ++~ NOTARY ~g ~Ra;l:ArIARGllli :ijj,jl!,(h: Jb v ~ MY COMMISSION EXPIRES: }UNE6, 2Ol0;tRES; JfjN~:~~ta Public _ State of FtomIe ~ BONDEDTHRUSTATEFARMFIREANDCASlJ.AUt~j ;:(" ' . ;:)a-.vv':te La\) ~~ Print or Type Commissioned Name Personally Known )( Produced Identification OR ; Type of Identification Produced END OF SECTION 56 o DRC Emergency Services, LLC 740 Museum Drive. Mobile, Alabama 36608 1-888-721-4372.1-251-343-3581. FAX 1-251-343-5554 REFERENCES ORC ES, ORC Inc, and their affiliates in the ORC Group have successfully accomplished numerous debris removal, management, reduction, and disposal contracts throughout the Southeastern United States, and the U.S. territories in the Caribbean and Pacific Ocean. DRC, ORC ES, and their affiliates and associated companies and subcontractors have together recovered in excess of 30,000,000 cubic yards of debris over the past almost 20 years. During the aftermath of Hurricane's Charley, Jeanne, Frances, and Ivan striking Florida during 2004, ORC mobilized on 37 separate, virtually simultaneous contracts removing approximately 10,000,000 cubic yards of debris and restoring miles upon miles of gulf front beaches to the original condition. Following Hurricanes Dennis, Katrina, Rita, and Wilma in 2005, DRC assisted in recovery efforts everywhere from the Florida Keys to Houston, Texas. Listed below are a few of the large-scale debris handling contracts that ORC has completed with reference contact information: o Town of Amherst, New York 1042 North Forest Road Williamsville, New York 14221 POC: Robert Anderson, Superintendent of Highways Tel: (716) 631-5990 Dates of Service: October, 2006 - December, 2006 Approximate fee for services: $12,000,000 Brief Description of Service: In the aftermath of the 2006 Winter Ice Storm "October Surprise" ORC responded to Amherst, New York, removing approximately 800,000 cubic yards of debris and 30,000 trees. Martin County, Florida 2151 SE Aviation Way Stuart, Florida 34996 POC: Darrell Wright, Field Operations Supervisor Tel: 772-221-1394 ext. 4; Cell: 772-260-6066; Fax: 772-221-1466 Email: dwright@mmiin.fl.us Dates of service: 2004-2006 Approximate fee for services: $25,000,000 Brief description of service: Clearance of hurricane generated debris following Hurricanes Jeanne and Frances (2004) and Hurricane Wilma (2005) o Page 1 References o Monroe County, Florida 1100 Simonton Street 2-216 Key West, Florida 33040 POC: Judy Steele-Clark, County Engineer Tel: 305-295-4329; Cell: 305-393-7878; Fax: 305-295-4321 Email: Steele-J udith@monroecountv-fl.gov Dates of service: 2005-2006 Approximate fee for services: $15,000,000 Brief description of service: Clearance of hurricane generated debris following Hurricanes Dennis, Katrina, Rita, and Wilma. o Louisiana Department of Transportation and Development 1201 Capitol Access Road P.O. Box 94245 Baton Rouge, Louisiana 70804 POC: Gordon Nelson Assistant Secretary of Operations Tel: (225) 925-7399 Dates of Service: September, 2005 - June, 2006 Approximate fee for services: Over $105,000,000 Brief Description of Service: In the wake of Hurricane Katrina in September 2005, ORC was contracted by the Louisiana Department of Transportation and Development to provide debris removal in thirteen parishes including the most heavily affected parishes Orleans, St. Bernard, Plaquemines, Jefferson, and St. Tammany Escambia County Florida 223 Palafox Place Suite 300 Pensacola, Florida 32501 POC: Bob McLaughlin, Assistant County Administrator Tel: (850) 595-4935/Cell: (850) 554-2772/Fax: (850) 595-4923 Email: bobmclaughlin@co.escambia.fl.us Dates of Service: September 2004 - February 2006 Approximate fee for services: $ 50,000,000 Brief description of service: Clearing and restoration of approximately 15 miles of Pensacola, Florida beaches destroyed by Hurricane Ivan. Removal and cleaning of beach sand, dune restoration and removal of remaining debris. Debris removal and condemnation of beach front structures as directed by the Government. Management of ROE project. o Page 2 o o o SECTION 10 NON-COLLUSION AFFIDAVIT STATE OF FLORIDA COUNTY OF The undersigned being first duly swom as provided by law, deposes, and says: 10.1. This Affidavn is made with the knowledge and intent that n is to be filed wnh the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this proposal. 10.2. The undersigned is authorized to make this Affidavn on behalf of, ~et - r pn ~[;c s LLC (Name of Co oration, artnership, Individua, etc.) a,\~~\\eO \\<:\'0\ ,\ ~ Co f'(\~~ ' formed ~erthe laws of (Type of Busin s) (cklcr;s, Re.{)"\\:)0~\ J of which he is e."',e\ DQ2rA-,",,~ b-\-Sc-er (Sore Owner, er, PreSident, etc.) {\. t c\ 6 <)'lY\~ (State) 10.3. Neither the undersigned nor any person, firm, or corporation named in above Paragraph 11.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicn favorable action for this proposal by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. 10.4. This proposal is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 11.2 has not colluded, conspired, connived or agreed directly or indirectly wnh any proposer or person, firm or corporation, to put in a sham proposal, or that such person, firm or corporation, shall refrain from Proposing, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said proposal or proposals of any other proposer; and all statements contained in the proposal or proposals described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 11.2, has directly or indirectly submitted said proposal or the contents thereof, or divulged information or data relative thereto, to any association or to any member or agent 1h1X': J ~L (';h, A' ~(At;{)^<. 6ff) c.e r ~kR'fS NAME 11 AFFIANT' TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME thisB..fh day of ---f1r.W~S.-ok Personally Known ~r Produced Identification ; Type of identification ,2008. (Affix seal h~re) :. .. . ERIKA-HUNt NOTARY PUBUC,.~ STATE AT LARGE MY COMMISSION EXPIRES 03.29-201 0 ~I'i~ ~Ltl:t NOTARY PUBLIC (name printed or typed) END OF SECTION 57 ~ SECTION 21 ANTI.KICKBACK AFFIDAVIT STATE OF FLORIDA COUNTY OF A~FIX ~OTARY STAMP HERE: . ~ 'l'~ o ,:' ';~'~UC:= STA1I:AllARGE N: CeMMiSSION EXPIRES 03-29-2010 " ~S~naIlY Known [] Produced Identification OR Type of Identification Produced END OF SECTION o 78 o SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(8) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to City of Sunny Isles Beach City Commission by MAr K ~~+A++o( d Ch~(r~ aperA~('{'1\ 6tf\ c er [print individual's name and title] for D R ~l:=~~~~ ~~~ ~~eM~lC- whose business address is: M4 fY\ '1-..' . I 0 ()'Se0~r\ u<2... ffi()ta~ \e A L sb fcl and (if applicable) its Federal Employer Identification number (FEIN) is ~~ Id. 8 ~ 7& OJ (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: .) o 11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Rorida StaMes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Proposal or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and invoMng antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. I understand that .convicted" or .conviction" as defined in Para. 287.133(1) (b), Florida Statutes, means a finding of guitt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or infonnation after July 1, 1989, as a resutt of a jury verdict, non.jury trial, or entry of a plea of guilty or nolo contendere. 11.4. I understand that an "affiliate. as defined in Para. 287.133(1) (a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The tenn .affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an ann's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. !o I 11.5. I understand that a .person" as defined in Para. 287.133(1) (e), Florida StaMes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The tenn .persons. includes those 59 c officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) /Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. _ The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. _ The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Oreler entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer detennined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) o I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. By: JAAA ~f- mAfsen~~~Af-{;('ct C1, r-lPrinted Name) k-.. C"c.. r _1)\ e:t 7Y'P r At\c'0) l.JtIl ce (Titld) Q...?-h ~ . Sworn to and subscribed before me thisV - day of A ~ -0 ,20 OS, by ~n'=::.- S...(--D-~~ . (AFFIX:NOT~RY STAMP HERE) 'i ~ +tt A A'l--f . ' ERIKA HUNT t ~ ~ NOTARY PUBLICi AlABAMA STATE AT lARGE Signature: Notary Public - State of ROAde- ~~ ~ MY COMMISSION EXPIRES 03-29-2010 Fv ~ Ie 0-- t-h A n-r \W "".:..! C Print or Type Commissioned Name Personally Known . / OR Produced Identification Type of Identification Produced o END OF SECTION 60 o Q o SECTION 17 ACKNOWLEDGMENT OF CONFORMANCE WITH OSHA STANDARDS To: City of Sunny Isles Beach We, DRC Emerqencv Services , hereby acknowledge and [Prime Contractor] agree that we, as the Prime Contractor for theDebri s Removal Services Contract, 08- 0 7 -0 1, as specified, have the sole responsibility for compliance with all the requirements of the Federal Occupational Safety and Hea~h Act of 1970, and all State and local safety and health regulations, and agree to indemnify and hold harmless the City of Sunny Isles Beach against any and all liability, claims, damages losses and expenses they may incur due to the failure of Cahaba Disaster Recovery Services [Sub-Gontractor] C.D.P [Sub. Contractor] [Sub-Contractor] to comply with such act or regulation. DRC Emergency Services,LLC CONTRACTOR Chief Doerations TITLE BY:~~ END OF SECTION 74 Q SECTION 18 EQUAL OPPORTUNITY/AFARMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed:~L ~ Title: Chief Operations Officer R~pRC Emergency Services, LLC Address: 740 Museum Drive Mobile AL 36608 END OF SECTION o o 75 o o o SECTION 19 CONFLICT OF INTEREST STATEMENT STATE OF FLORIDA COUNTY OF BEFORE ME, the undersigned authority, personally appeared MAr ~ sworn, deposes, and states: 19.1. I am the fA ie /'O(Pr A-h/Jj offlc er with a local office in and principal office in lS-l-ftf!;rd , who was duly Of~~ ErDr&(>~ !:iru;ces, Ll.f.. Ilttll1,'/p; A-L eo . 19.2. The above named entity is submitting a Proposal for the City of Sunny Isles Beach, RFP No. ~ - OJ r 0 I described as: Emergency Debris Clearing and Removal Operations. 19.3. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 19.4. The Affiant states that only one submittal for the above Proposal is being submitted and that the above named entity has no financial interest in other entities submitting proposals for the same project. 19.5. Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above proposal. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 19.6. Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 19.7. Neither the entity, nor its affiliates, nor anyone associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 19.8. I certify that no member of the entity's ownership or management is presenUy applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 19.9. I certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 19.10. In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach. F3~ Dated this 0..-- day of ~ ~3~ ,,-+- , 2008. ~ ~ - /Y\t1f 1< ~t-AF~ Ch;~rQ;erA-h'Ons . ~~FIANT ~~ Print or Type Name and Title othce.f Sworn to and subscribed before me this ~day of ~j'2r J '..-+- ,2008. uvPersonally Known OR o Produced Identification ; Type of Identification CCk:Z~ ~V1+ NOTARY PUBLIC STATE OF FLORIDA ERIKA HuNt NOTARY PUBUC: AlA~:STATE AT LARGE MY COMMISSION EXPIRES 03-29-201 0 76 ,.J (........... "I " C) SEcnON 20 DISPUTE DISCLOSURE FORM 20.1. Has you firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO x 20.2. Has your finn, or any member of your firm, been declared in defautt, terminated or removed from a contract or job related to the services your finn provides in the regular course of business within the last five (5) years? YES NO x 20.3. Has your firm had against it or filed any requests for equnable adjustment, contract claims, Proposal protests, or litigation in the past five (5) years that. i~ rela~ to the ~n;ces yo~r firm provides in the regular course of business? Please see attached pend1ng 11 t1gat1on YES x NO If yes, state the nature of the request for equitable adjusbnent, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the sutt and the monetary amounts of extended contract time involved. g List I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Proposal for the City of Sunny Isles Beach, RFP No. 08-07-01, Emergency Debris Clearing and Removal Operations. DRC Emerqency Services, LLC Firm 8-8-08 Date ~A,&"o;.dS' ~t 1- umonze Igna ure --- Mark Stafford Print or Type Name and Title END OF SECTlON o 77 o SECTION 22 PROPOSALCHECKUST THE FOllOWING ARE REQUIREMENTS OF THIS PROPOSAL. USE OF THIS CHECKLIST Will HELP ENSURE THAT YOUR SUBMISSION IS COMPLETE. Place a check mark in the "Done" column as you complete and enclose each item. Q Reauired Done Reauirement ..J V""'" Proposal Response Sheet / Fee Schedule Fonn I Procosal Scecifications ..J ~ Proposal Security - Five Percent (5%) ..J L-- Certificate(s) of Insurance - ..J ~ Certificates of Competencies (Fl ~(cz... -t-o.('u ) ..J ~ local Business Tax (Occupational Business Ucense) ..J ~ State License(s) - -to d.e:. h,~ rtiI S ~ ..J 1.- Ust of Proposed Sub-Contractors ..J ~ Proposer Qualification Statement ..J t/" Non-Collusion Affidavit ..J (~ Non-Kickback Affidavit ..J c........-- Public Entity Crimes Sworn Statement ..J L--- Acknowledgement of Confonnance with OSHA Standards ..J ~ Equal Opportunity/Affinnative Action Statement ..J c..-- Conflict of Interest Statement ..J t/"'/ Dispute Disclosure Form ..J ~ RFP Checklist This checklist must be part of the RFP. Please read the entire RFP documents thoroughly to ensure that your submission Is complete. END OF SECTION Q 79 ~ D o DRC Emergency Services 740 Museum Drive. Mobile, Alabama 36608 1-888-721-4372.1-251-343-3581. FAX 1-251-343-5554 GENERAL OPERATIONS PLAN 1. ORGANIZATIONAL STRUCTURE AND KEY PERSONNEL ............................................. 3 2. TECHNICAL APPROACH........................................................................................................ 4 TIME ESTIMATED TO REMOVE DEBRiS................................................................................ 4 MOBILIZATION PLAN .......................................... ...................................................................... 4 ORC GROUP EQUIPMENT AND SUBCONTRACTOR EQUIPMENT .................................... 4 EMERG EN CY DEBRIS CLEARANCE (PUSH)........................................................................ 21 DEBRIS REMOVAL (LOAD AND HAUL) ............................................................................... 23 DEBRIS HA ULIN G ..................................................................................................................... 27 TEMPORARY DEBRIS STAGING AND REDUCTION SITE MANAGEMENT ................... 30 DEBRIS S EG REGA TI ON ........................................................................................................... 33 DEBRIS RED U CTI ON ................................................................................................................ 35 DEBRIS DISPOSAL.................................................................................................................... 37 DEBRIS STAGING SITE RESTORATION ............................................................................... 38 3. TRACKING, REPORTING AND REIMBURSEMENT......................................................... 41 4. GEOGRAPHIC AREA MANAGEMENT SYSTEM .............................................................. 44 5. SAFETY PLAN........................................................................................................................ 46 6. QUALITY CONTROL PROGRAM ........................................................................................ 57 7. RECY CLIN G PLAN................................................................................................................ 68 - o I Sunny Isles Beach, Florida 1 I Managing Director Robert J. Isakson I Chief Operating Officer Mark Stafford I I Vice President Vice President Vice President Emergency Mgmt. Marine Divison Logistics Operations Consultant Eli Zatezalo John Reily Paul F. Persons Walter Maestri, Phd I I Debris Removal \ Equipment Support Documentation Contracting Operations I I 1 r I ...... Quality Control Equipment Manager Manager Vice Contncts Erika Hunt Janetta Allison President Manager I Chuck April I Prieur Callaway Road Side Collections Equipment Support Ticketing I I & Hauling Carlos Lorenzy Sub Client I contractors Relations Temporary Staging Tower Reconciliation and Reduction Sites I Reduction Daily Reconciliation Operations I Demolition, ROE & Recovery Operations I Final Disposal Operations --.... - 10 2 j 1. ORGANIZATIONAL STRUCTURE AND KEY PERSONNEL ORe's organizational structure is illustrated in the organizational chart attached. Resumes for key personnel are included in this proposal. Responsibilities of key positions for this contract from Management to Field Supervisory Level include: The Chief Operating Officer (C.O.O.) is positioned at ORC headquarters. The C.O.O. directs and supervises all operational aspects of ORC and team partners in response to a Task Order. The C.O.O. serves as the primary contact between ORC and the client for all contract and other communication. Upon Task Order, the C.O.O. initiates all corporate plans in fulfillment of contract requirements and activates all relevant departments, team partner relationships, subcontract relationships, and reservists. The C.O.O. supervises and directs mobilization of national corporate resources in response to Task Order until all performance targets are met and serves as corporate "responsible party" until all obligations of the contract are fulfilled. o The Operations Manager (O.M.) is a member of ORC Senior Management assigned as principal liaison to the client for each operation. The Operations Manager will henceforth be on call and available to respond to the point of contact 24 hours a day, 7 days a week throughout the life of the Task Order. The ORC Operations Manager will have full electronic linkage to the client via cell phone, satellite phone, internet, and/or two-way radios. The O.M. will have responsibility for successful completion of a Task Order and is responsible to the client as well as the ORC C.O.O. ORe's Project/ Program Manager is responsible for overall management of day to day operations for a specific project. His duties primarily exist in the oversight of field operations although he serves as administrator of his supervisors and office personnel. All field supervisors, crew supervisors, QC managers, safety managers and site mangers report to the project manager throughout everyday, 7 days per week. The project manager shall hold daily meetings with staff to discuss all debris mission issues at a central location that is also open to GOVERNMENT. There duties also include the management of documentation and pubic relations for the specific project. The project Manager reports directly to the KO or the COR. All Field Supervisors will be assigned sectors or zones within a specific debris area to manage. They will be responsible for supervising the daily activities of the collection crews working to remove debris. Those subcontractors/ crews within the sector or zone are to report directly to ORC's field supervisor with any and all issues. If these issues require upper management decisions, then the supervisor is to report to the project manger immediately. The field supervisor communicates with the project manager at a minimum twice per day to update the project manger of the activity in their particular zone or sector. o The field supervisor works hand in hand with the sector safety manager and quality control manager to ensure a safe and compliant operation in the field. He answers directly to the project manager but is instructed to take action if the safety or qc manager raises any safety concerns and has the authority to stop work. Daily and QC reporting is a primary and important function 3 ::> Q o ~ of the field supervisor; they are to fill out and submit daily reports to the project manager for all activities within that zone on a daily basis. Crew Supervisor will be responsible for individual or a group of crews working within a specific debris zone. They will oversee the actual collection and loading of all debris along with the proper segregation and identification of various waste streams such as Vegetative, C&O, White goods and HHW. They are tasked with directing the individual crews within the zones and their speci fic zone assignments and ensuring safe traffic control with the aid of the QC manager and safety manager. The crew supervisor handles all zone maps and sub-zone maps with individual crews. Subcontractors will be assigned zones and crews will subsequently be assigned sub zones; crew supervisors shall distribute these crew maps and manage their production and boundaries within these zones. Site Managers shall be assigned to each and every site located within any debris mission to include TOSRS' s, Staging sites, Final disposal sites. These managers will oversees and direct all unloading, reduction, traffic control, inspection tower issues and site equipment and trucks. Site managers report to directly to the project manager, but also communicate with the crew and field supervlsors. 2. TECHNICAL APPROACH TIME ESTIMATED TO REMOVE DEBRIS Including mobilization and close out, ORC Emergency Services estimates that it will take approximately 15 to 16 days to remove approximately 40,000 cubic yards of mixed debris. To achieve this estimate, ORC will chip and grind approximately 2,700 yards of debris a day. Approximately 8000 cubic yards will then be hauled out by 2 (two) chip trailers hauling 5 (five) loads of debris a day. MOBILIZATION PLAN ORC Emergency Services (ORC ES) will mobilize dozens to hundreds of personnel and equipment crews immediately upon request. Our first, advance deployments will be strategically staged in advance of predicted weather event. ORC ES will commence mobilization of equipment, operators, and laborers immediately upon receipt of a Task Order Notice to Proceed to meet all requirements of the Government.' DRC GROUP EQUIPMENT AND SUBCONTRACTOR EQUIPMENT The ORC GROUP (ORC), which includes ORC Emergency Services, ORC, Inc, Equipment Leasing (EQL), and associated and affiliated companies and subcontractors, owns substantial trucks and specialized pieces of heavy equipment, attachments and support equipment specifically designed for emergency response. ORC owns dozens of cellular and radio telephones for use in an emergency. ORC ES, ORC and/or their subcontractors have national priority contracts with multiple national equipment leasing companies and subcontractors and/or 4 ""\. "" o Q independent contractors through which hundreds of trucks and/or pieces of heavy loading equipment are available to supplement ORC's and/or the subcontractor's fleets. In summary, ORC ES is capable of mobilizing all of the listed equipment and more, as needed, to meet the clearing requirements of a Notice to Proceed Included at this tab is a listing of DRC and subcontractor owned equipment, a listing of equipment owned by Cahaba Disaster Recovery (a subcontractor) and by CDP, Inc. (a subcontractor). DRC GROUP EQUIPMENT 100 - Light Trucks General Infonnation Owner Unit# Year Make Color Model Serial # Tag # DRC 122 1999 Ford WHI F-1504x2 I FrRFI7W6XKB77365 AL 2B0939J RAM2500 AL DRC 135 2000 Dodge GRN 4x4 3B7KF236XIG 171841 2B9672L AL DRC 136 2000 Dodge GRN Dakota 4x4 I B7GG2AX5YS703398 2A 1103Y AL DRC 137 2000 Dodge GRN Dakota 4x4 I B7GG2AXXYS720925 2Al104Y AL DRC 138 2000 Dodge RED Dakota 4x4 I B7GG22X I YS 703395 2B9673L Frontier XE DRC 148 2001 Nissan WHI 4x2 I N6ED27T8I C362774 AL 2B0945J DRC 149 2001 GMC GRN Denali 4x4 I GKEK63 U91 J209254 AL2B0946J DRC 155 2004 Cadillac WHl Escalade 4x2 IGYEK63N85Rl83669 AL 2c 138c DRC 157 2005 GMC BLK Yukon 4x4 I GKEK63U 15J195744 AL 2e5161 F DRC 159 2005 GMC WHI Envoy 4x2 I GKDS 13S052154898 AL 2c7379F DRC 158 2005 GMC SLVR Envoy 4x2 I GKDS 13S652286340 AL 2c5162F EQL 162 2006 Ford. Crew Cab Lariat WHI F-250 4x4 I FrSW21596EA32289 AL2cl431J EQL 164 2006 Ford. Crew Cab Lariat WHI F-150 I FrPW 145X5KE85526 AL2cl435J EQL 167 2005 GMC GRY YUKON I GKEK63 U45J200306 AL2cl434J EQL 168 2006 Ford. WIT - 2 door WHI F-1504x2 I FrPX 14536NA02505 AL2cl432J EQL 169 2006 Ford. Crew Cab Lariat WHI F-150 I FrPW 14565FB56959 AL 2c 1433J EQL 170 2006 Ford BLK Expedition I FMFUI8516LA22760 AL2c7610L AL EQL 171 2006 GMC GRY Envoy 4x2 I GkDS 13SX62247574 2C8381 L AL EQL 172 2006 GMC GRN Envoy 4x2 I GKDS 13S662225216 2C8382L AL EQL 173 2006 GMC GRY Envoy 4x2 I GKDS 13S362263549 2C7328M AL EQL 174 2005 Inliniti SLVR QX56 5N3AA08CX5N805615 2C8327M AL EQL 175 2006 Ford. Extended Cab Lariat WHI F-250 4x4 I FrSX21 P06ED29949 2C8247M AL EQL 176 2006 Ford. Extended Cab Lariat WHI F-250 4x4 I FrSX21 PX6EC83403 2oilO99A AL EQL 177 2006 Ford. Crew Cab Lariat WHI F-1504x4 I FrPWI4596FA3 1441 2C8246M AL EQL 178 2006 Ford Reg Cab WHI F-1504x2 I FrRFI2WX6NA57265 2oil211A EQL 179 2006 GMC WHI Envoy I GKDS 13S 16222'8279 AL 2C0345P AL EQL 180 2005 Ford BRN Explorer XLT I FMZU73K75UC02458 2C9147N AL EQL 181 2005 Ford SLVR Explorer XL T I FMZU73K05UB70873 2C9146N 5 .... EQL 183 2006 GMC SLVR Envoy 4x4 I GKOTI3SX62285318 AL 2C 1538S EQL 184 2004 Ford GRN Expedilion I FMFU 18L34LB60988 AL 2C50275 AL EQL 185 2004 BMW BLU 330CI WBABW534X4PL42875 2C4739Y EQL 186 2005 Ford AnnoI' level B6 WHI Excursion I FMSU41 P35ES42418 EQL 187 2005 Ford AnnoI' level B6 WHI Excursion I FMSU41 P55E042420 EQL 188 2005 Chevrolel AnnoI' B6 SIL Suburban 3GNGK26G65G244965 EQL 189 2005 GMC SIL Envoy 4x2 I GKOS 13S752309415 AL2CI1372 EQL 190 2002 Ford BLK Expedition 1 FMUI7LX2LA88635 EQL 191 2006 Ford WHI F-650 4x2 3FRNW65RI6V255189 AL2x300427 Silverado AL EQL 192 2006 Chevrolel BLK CI500 IGCECI9VX6Z267359 204093A AL EQL 193 2006 Toyola REO Prius Hybrid JTOKB20U663 133239 204092A AL EQL 194 2006 Ford GRY F-150 4x2 I FfRXI2WI6NA90491 204094A AL EQL 195 2008 Cadillac BLK Escalade I GYEC63818R I 025958 2C5764 V Expedition EQL 196 2008 Ford BLK (EB) I FMFUI7588LA26793 , c 300- Trucks General Infonnalion Owner Unil# Year Make Color Model Serial # Tag # AL ORC 300 1996 GMC WHl TopKick I GOJ7H IJ3TJ509970 2AP705178 Vacuum AL ORC 315 1986 Intemational WHI Truck 2HTNFHYNOGCB 12051 2X300426 ORC 316 1994 Inlemalional 94004x2 2HSFHEGT7RC080619 AL2X35084 AL ORC 319 1994 Inlemalional - Box YEL 49004x2 1 HTSOAAM 1 RH593325 2X20 1292 AL ORC 324 1994 Freighlliner WHl FLOl2064ST 1 FUYOZYB5RH864681 2AP705178 ORC 326 2000 Volvo WHl VN L64 T 4 V4N03JJ8YN241360 LA PI22559 FLO 12064ST AL ORC 329 1994 Frei!!hlliner WHI 6x4 I FUYOZYB5RP689600 2AP705176 EQL 335 2003 Kenworth WHl Tandem T800 2NKOL VOX83J392848 o 500 - Trailers Gcnerallnfonnalion Owner Unit# Year Make Color Model Serial # Tag # 500 1982 Polar American 40' 1873 None AL ORC 501 1997 Trail Kin!! 24' I TKC0242XVG039030 2TR02900 AL ORC 509 1999 Haulmark WHl C510BS 10' 4XSCB 10 18XG009863 2UTA7590 Featherlile command ORC 510 2000 center GRY 5'X IO'X53' 4 FG-L0532-3- YC028239 LA E48785I AL ORC 519 1998 Wilzco BLK Orop Oeck I W8C31 E24 WSOO0656 2TR0290 1 AL ORC 520 2000 Wallace BLK Lowboy OLBT5031000000 125 2TR02904 AL ORC 523 2000 Viking BLK Lowbov 1 V9CR4638YN062403 2TR02903 AL ORC 527 2001 Viking BLK 46' Lowboy I V9CR46321 N062452 2TR02902 ORC 528 1998 Long - Boat Trailer 700 J BJ 1 LGAMAMIXWI005046 UTIL 08 AL ORC 531 2001 Ex oress WHl L5X8 4X4TSE2131 U301974 2UTA7588 6 :> AL DRC 534 2005 P0I1 Citv Trailers BLK 7xl2 SDTA 4PCU2122751000030 2UTB2673 LLC 535 2002 Iron Dog Trailer - Flat Bed 18' X 8' SN5FELS 1 8272C00688 I AL A008703 Pace An'ow EQL 536 2005 Fleetwood RV BRO 36D 5B4MP67G053402664 AL 2A4867 7403 Horse AL LLC 537 2006 Dream Coach SIL Trailer I D9HG 1 9256P397243 2TR425I AL EQL 538 2006 Hvdraulic Boat Trailer GRY HST A3800T IH9SGWL324W138115 2TR02906 6x 12 Cargo EQL 539 2007 Cany-On Trailer WHI Trailer 4 YMCLl2197G066383 AL A008644 6.IOx16 EQL 540 2006 Roadclipper BLK Flatbed 46UFU 1623611 05798 6.IOx16 EQL 541 2007 Roadclipper BLK Flatbed 46UFUI62371108234 WT-L-BHP AL EQL 542 2002 Haulmark TL WHI 6280 4XSG540362G041778 2TR02905 AL EQL 543 2007 Econline BLK DP2425DA 42EDPKV297 1000240 2TR05893 AL EQL 544 2007 Haulmark TL WHI GRG85X32W 16HG532267G091896 2TR05794 o 700 - Hea\'\' Equipmcnt Gcnerallnfonnation Owner Unit# Year Make Model Serial # Tag # 700 1992 Ford 655C AB06712 Backhoc 702 1997 Volvo L90C L90CV6268I Loader 713 1984 Fiat-Allis PL-60 004278 Side-Boom 718 1984 Fiat-Allis PL-60 004890 Side-Boom 719 1984 Fiat-Allis PL-60 004335 Side-Boom EQL 721 2006 Kawasaki Utility Tractor JKIAFCJI378511884 Tractor EQL 722 2006 Terex RT780 80 ton Crane 14405 Crane EQL 723 2006 Telescopic Forklift LULL 1044C 160015829 Forklift EQL 725 2004 Prentice 120 E-TS Knuckleboom PR59351 1100 - Scrcening E ui mcnt 1111 General Information Owner Unit # Make Model IRS 48"x60" 1200 - Burncrs General Infollnation Owner Unit# Year Make Model Serial # Tag # 1201 1996 Quailco Air CUl1ain 1204 2001 Crochet Eauin 2030 Ceramic o 1300 - Attachmcnts Gencrallnfollnation Owner Unit# Year Make Model Serial # Tag # 1313 1998 Pembel10n L7003LPR l422-3-1098L Grapple Electro- 1330 1999 Sieb SI03 5608 Magnet 1349 Rockland LRL90 Nl0254B Grapple 7 ~ 1352 I_I Volvo ~ I 453-10185 I Forks 1400 - Boats/Motors General Infollnation Owner Unit# Year Make Color Model SClial # Ta!!# 1402 2001 Lowc L1648SS OMCL3126GOO I Boat 1403 2001 Johnson J25EVSI 04886341 Motor 1404 1998 Lowe SI542VT OMCL312J798 Boat 1405 1998 Johnson J25ELEC 04424096 Motor 1406 2001 Honda 4 Wheel A TV RED TRX450S SN478TE220614205591 1407 2004 HONDA 4 WHEELATV YEL TRX350FMA SN478TE250X443 12403 Tugboat EQL 1408 2006 Clvdcsdale "Miss Doris" 25'3x 14x5 WB040MIF0606 Boat EQL 1409 1980 Bar!!e "T ell"V Lee" Bar!!e Barve EQL 1410 1964 Bar!!e "CGB-680 17" Barge Bar!'c DBOM 1411 1983 EIDE BARGE 35 Otlicial # II 00 IMO #9160889 Bar!!c 1500- Welders Generallnfollnation Owner Unit# Ycar Makc Model Serial # Ta!!# 1510 Millcr Super s-32P 1512 Millcr 255NT G973706639 o 1600 - Fuel Equiomcnt Generallnfollnation Owner Unit# Year Makc Model Serial # Tal' # 1610 3000 GAL RED Tank EQL 1611 Fuel Pump EQL 1612 Fuel Pump o 1700 - Portablc Buildil.!'s & Containers Generallnfollnation Owner Unit # Year Make Model Serial # Tag # 1707 1984 Container 40' 152680-0 1708 Reefcr Containcr 40' 1709 Container 20' TPXU694049 1712 Container 20' 1713 Container 40' Senior & Mall"ied EQL 1714 Complex 150x34 EQL 1715 Junior & Female Complex 144x26 EQL 1716 Crall DOllnitOl"V Complex I 44x26 EQL 1717 Crall DOllnitory Complex 144x26 EQL 1718 Crall DOllnitory Complex 144x26 EQL 1719 Calerin!' Win!! Complex 96x26 Senior Kicthen & Dinner EQL 1720 Comolex 78x48 Senior Recrcation EQL 1721 Comolex 50x48 EQL 1722 Laundrv 12x48 EQL 1723 Commissal"V (Mud Room) 140x24 8 ........ J o o 8xl2 820 1724 1725 Guard House Olliee Conex 1800-Misccllancolls Generallnfollnation Owner Unit # Year Make Model Serial # Tag # 1805 2000 Hausqvaran Chain Saw 365 special 003100359 1810 1997 John Bean 300 Gallon Sprayer 1811 1997 John Bean 1.000 Gallon Snraver 1814 Air Comnressor #705 5-13-897 1815 Speedaire Air Comoressor 3JR79 1817 Bel Air 318VLO 66838 1818 1999 FAN SPL4223 BOO 1819 2000 NAPA 85-5000 1824 Mosa 222 SRX 50 P-3 2201 39908Z 1825 Weber Robin EC08 995703 1826 Motiri Air Comnressor 911161141 1827 2000 MVP 2 1/2 Ton Floor Jack None 1829 NIA 48" BOO 1831 Sneedaire Air Conl')ressor 032989L-078956 1832 Dav10n Ballerv Char<>er - JC-240 II 24011 1833 Camnbell Hausfield Electric L11-15-2000-00439 1837 Walker Packer 2.7 Model 50902744 BS604 1841 Honda Water Pump GXl60 5.5 Engine 1842 Alkota Power Washer 2162AZ 217555 Rent Spray 1843 Titan Plus 313701698 Rent Spray 1844 Titan Plus 313701172 EQL 1845 Lightsourcc Light Tower 5826373627 EQL 1846 Lightsource Light Tower 5826372512 EQL 1847 2006 Stone Concrete Mixer 95 cm 222006258 Sweet Water Treatment EQL 1848 System 3670 SSV- EQL 1849 JLG Lift lOP 83704 Side Scan EQL 1850 Centurion Sea Scan Sonar System 2001-0 I BallelY EQL 1851 Fleet Ballelv Chamer Charger IJYU3 1900-Commllnications General Infollnation Unit# Year Make QTY Model Serial # Tag # 1900 1999 Satellite Phonc I SP200P 99300492 1901 1999 Satellite Phone I SP200P 99300252 74039E4E. 74039E3 E, 74039EI E.74039E2C 74039DCE,74039EI B See tile for Globestar to go Qualcol1ll1l 74039E2 D,74039DF7 phone 1902 2005 GSP 1600pkg 10 CE 168X 74039DBA,74047B7E numbers 9 ) 2000-Gcllcrators Generallnfollllation Unit# Year Make Model Selial# Tag # 2000 Mitsubishi 5KV +/- Gas Generator Family TMU297U 1 G2RA 2001 Coleman Generator 3KY PowerPledge 87120636 2002 1997 Ingersoll 50KW Generator 283016 EQL 2003 CAT XQ 225KW Generator EQL 2004 Caterpillar XQ2000 Generator EQL 2005 Caterpillar XQ2000 Generator 480 to 120/208 or EQL 2006 RTE Power Transfollller 120/240 Vae 480 to 120/208 or EQL 2007 RTE Power Transfollller 120/240 Vac 480 to 120/208 or EQL 2008 RTE Power Transfollller 120/240 Vac 480 to 120/208 or EQL 2009 RTE Power Transfollller 120/240 Vac DGDA- EQL 2010 2005 Cummins Onan 100KW 1 5003522 JOI0298398 DGFA- EQL 2011 1999 Cummins On an 150KW I 3383925 L990036013 DGFA- EQL 2012 2000 Cummins On an 150KW 1 3385024 AOO040036 EQL 2013 1997 Cummins Onan 500KW I 500DFED C970634027 EQL 2014 ? Cummins Onan 500KW I 500FFFB JP20488326 .:> EQUIPMENT OWNED BY PRINCIPAL SUBCONTRACTOR CAHABA DISASTER RECOVERY: CAHABA DISASTER RECOVERY, LLC 4619 SPRINGHILL AVENUE MOBILE, ALABAMA 36608 BUDDY FUZZELL 205-531-4407 -, ..... Equipment Summary: (5) 06 R Caterpillar Track Type Skid Steer (4) 04 H Caterpillar Track Type Skid Steer (7) Caterpillar and John Deere Track Hoe Excavators (315,318,320,330,345) (8) Caterpillar Tele-handlers (Th 1 03, Th63, Th83, Th350) (9) Caterpillar and John Deere Skid steers (246, 287, 936F, 938G, 950G, 966G) (7) 210 Prentice Loaders (36) Trucks -70 to 100 cubic yards ***7 major subs with over 400 pieces of equipment 10 Models: 2003-2006 2002-2006 2005-2006 2004-2006 2003-2006 2000-2006 ) o o NUMBER CAHABA EOUlPMENT LIST: HEAVY D4H-7PKOOI81 TSK3 CATERPILLAR TRACK-TYPE SKID STEER D4G L- OFDC00427-REN007 CATERPILLAR TRACK-TYPE TRACTOR D4 LGP-OFDC00482 CATERPILLAR TRACK-TYPE TRACTOR D4G LC -CA TOOD4GCTLX00850 CATERPILLAR TRACK-TYPE TRACTOR D6RIIXW-AEPOO 185 CATERPILLAR TRACK-TYPE TRACTOR D6R-CA TOOD6RA8 LN00558 CATERPILLAR TRACK-TYPE TRACTOR D6NXL--CCK00612 CATERPILLAR TRACK-TYPE TRACTOR D6H-6FC0624 CATERPILLAR TRACK-TYPE TRACTOR D6RIIXW-AEPOO 183 CATERPILLAR TRACK-TYPE TRACTOR 936F-8AJOO249 CATERPILLAR WHEEL LOADER 950G-3JWO 1557 CATERPILLAR WHEEL LOADER 966G- 3 S WOO 540 CATERPILLAR WHEEL LOADER 938G-6WSOI225 CATERPILLAR WHEEL LOADER 966G-3SW00469 CATERPILLAR WHEEL LOADER SKlS246-CA T00246P55Z06277 CATERPILLAR SKID STEER/WHEEL LOADER 240SS-K V02408440986 JOHN DEERE SKID STEER/WHEEL LOADER 287B-ZSA02843 CATERPILLAR SKID STEER 315CL-CA T0315CHCJCO 1 004 CATERPILLAR EXCAVATOR 3 18CL-MDY00240 CATERPILLAR EXCA V A TOR J D270LC-FF0270X070294 JOHN DEERE EXCA V A TOR 345BIIL-AGS00532 CATERPILLAR EXCAVATOR 320CL--EAG00257 CATERPILLAR EXCA V A TOR 330DL-B6H00267 CATERPILLAR EXCA V A TOR 330DL-NBD0040 1 CATERPILLAR EXCAVATOR 345CL-PJW01322 CATERPILLAR EXCA V A TOR 315CL-CA T0315CLOCJC02999 CATERPILLAR HYRDA EXCAVATOR 315CL-CA T0315CLOCJCO 1867 CATERPILLAR HYDRA EXCAVATOR TH350B-CA TTH350KSLD00299 CATERPILLAR TELEHANDLER TH 103-3PN02659 CATERPILLAR TELEHANDLER TH83-J3RN04716 CATERPILLAR TELEHANDLER TH63-5WM7391 CATERPILLAR TELEHANDLER 950G-3JWO 1225 CATERPILLAR TELEHANDLER TH 103-3PN02736 CATERPILLAR TELEHANDLER TH63-05WM080 18 CATERPILLAR TELEHANDLER TH63-5WM07638 CATERPILLAR TELEHANDLER TH63-5WM03000 CATERPILLAR TELEHANDLER KNUCKLEBOOM LOADER KNUCKLEBOOM LOADER 525B-3KZ01615 CAT WHEEL SKIDDER 611 EX HYDRO AXE-5923/3942 HYDRO AXE BUSHHOG & DISK- I 2-00436 & 476988 BUSHHOG 296 CUTTER & DISK JD5205-L V5205C721215 JOHN DEERE 4 WD TRACTOR VERMEER SC60TX-528 STUMP CUTTER WrrRAILER 11 ) II" Q Q RITE-LlTE-C081051/46 RITE-LlTE-C081238141 GROVE RT422-68803 LIGHT PLANT LIGHT PLANT GROVE--CRANE EQUIPMENT OWNED BY PRINCIPAL SUBCONTRACTOR CDP CDP, INC. P.O. BOX 2824 BA Y ST. LOUIS, MS 39520 C.W.228-332-0238,194*109*4893 OFFICE 228-463-0437 FAX 228-463-0467 CDP EQUIPMENT LIST: HEAVY NUMBER CAT. D6N LGP DOZER ALY1521 CASE CX240 DAC0724238 CASE 521 LOADER JEEOl33935 CASE 130 TRACKHOE DAC131779 CASE 1150H CRAWLER CALOO1162 CASE 1850K DOZER HHA43 I 125 CASE 850 DOZER JJG0296121 CASE CXI60 DAC162048 CASE 580M 4X4 N5C388154 CASE 240 TRACKHOE BAC241714 CASE CX 130 TRACKHOE DACI31998 CASE 650 DOZER CALO 12256 CASE CX 75 DAC071422 CASE 621 E LOADER N7F202653 KOBELCO SK135 SRLC YH04-03639 KOBELCO SK210LC YQ08-U2430 KOBELCO SK135 SRLC YH04-03522 KOBELCO SK290 LR LB04-U0487 KOBELCO 70SR YT04-08005 KOBELCO SK210LC YQ08-U2431 KOBELCO SK210LC YQ08-U2455 KOBELCO SK210LC YQ08-U2456 TAKEUCHI TLl50 21502533 12 1 ~ o c TAKEUCHI TLl50 21502460 TAKEUCHI TLl50 21502445 TAKEUCHI TLl50 21502537 TAKEUCHI TLl50 21502514 TAKEUCHI TLl50 21501993 TAKEUCHI TLl50 21502421 TAKEUCHI TLl50 21503132 TAKEUCHI TLl50 21502372 TCM-E806 FORKLIFT 60806397 T300 BOBCAT PRENTICE 180E LOADER 7206876 PRENTICE 180E LOADER 7204079 BARKO 160D LOADER 10122967 JOHN DEERE 335 LOADER WC0335XOII107 PRENTICE 120 LOADER 120732777 PRENTICE 210 P52755 PRENTICE 2180 LOADER 2180PR60361 I TIMBERJACK 330B WC330BXO 11042 LUCKY- L320VM 111577595 PRENTICE 210D 210P52755 AMERICAN CRANE-AM599 GS6740 KUBOTA KXl61EXCAvATOR JKUK 1613JO 1 H32199 KUBOTA KXI61EXCAVATOR JKUKI613TOI H31517 KUBOTA KXI61 EXCAVATOR JKUK1613K01 H32198 KUBOTA RTV1100 KRTVII0071010735 KUBOTA KX161-3 EXCAVATOR 32804 KUBOTA U45-3SS JKUU0453LO IH30372 KUBOTA KX91-3RIS JKUK0913EOI H31521 KUBOTA M 108SHDC 50026 KUBOTA RTv900W6H 71068 KUBOTA KXI61 21115 AROC06X6FORWARDER #1626 HEINZE-RENKE 6X6 FORWARDER #SFPIOO 1 JOHN DEERE 570B MOTOR GRADER 524980 13 ~ , I EXPLODER KNUCKLEBOOM IG o CDP EQUIPMENT LIST: TRUCKS NUMBER 2006 KENWORTH 1 NKWLBOX665152022 2006 PETERBUIL T 1 NP5LBOX86N637244 2006 PETERBUIL T 1 NP5LBOX26N896831 2006 KENWORTH 1 NKWLBOX26J 143883 2006 KENWORTH 1 NKWLBOX96J143881 2006 KENWORTH 1 NKWLBOXX6J 157496 1996 FREIGHTLlNER 1 FVXJLBB5TL576542 2006 IHC BLK INT. 1 HSXRSCT16J247236 06 IHC ORlCRM INT 1 HSXRAPR06T323957 07 BLK INT 1 HTXRAPT37 J463560 95 WH VOLVO 4V1 JDBJF5SR835034 85 INTERNATIONAL 1 HTLAHEM9FHA22745 95 RED VOLVO GMC 441JDBPF4SN840210 95 WH GMC 4V1 JDBPF9SN842907 97 MACK (WH\ 1 M2P289C5VM022592 80 P&H HYDRO CRANE WH, YELLOW, BLK 99 STERLING CRANE 2FZHRJAA8XAA38554 89 ZELlGSON BUCKET TRK M7241 0632 94 FORD FUEL TRUCK-RED 1FDWR72C1RVA12914 o CDP EQUIPMENT LIST: TRAILERS NUMBER 04 ECONOLlNE 42EDPKT2X51000359 04 ECONOLlNE 42EDPKT2X51000358 04 INTERSTATE IJKDLA4024M005162 98 SUMMITT I 59SS2228KS239047 04 INTERSTATE I JKDLA40S4M004863 03 INTERSTATE IJKDLA4005M006635 04 INTERSTATE I JKDLA4045M005682 SUMMITT 15955777 ACS739047 05 FONTAINE 4LFE5130X53528102 07 FONTAINE 13N24830071538463 06 FONTAINE 13N24830261537703 14 , o o 05 FONTAINE 4LFE5030153527575 00 VIKING HIGHDECK LB-VDD46RI6M I V9CR4634YN062401 93 TRAILKING I TKS04532PM043222 00 VIKING I V9CR4636 YN062402 98 CPS -TSTD45 4Z451 5627XPOO 1687 96 EVERGREEN- ALF04 1 S94A4529TM006559 98 CPS- TSV45 4Z4515622XPOO 1676 99 CPS GREY 4Z4515624 YP002359 99 CPS GREY 4Z4515626 YP002623 98 SLVR CRESCENT-451396WF IC9LD4520W1150587 98 CPS GREY- TSV45 4Z4515626 WPOO 1324 98 SUMMIT I S8AL452XWOO09807 90 BOCATS 15RB04027L1 SF0234 88 BOCATS 15RB04024J I SFOI72 96 GREAT DANE 48XI02' I GRAA9624TS063 132 83 WHo LUFKIN PEPSI- TFV-I PST I LOIA4821 01061888 92 SL VR TRAILMOBILE- 061709 WH 06 GREAT DANE IGRAA06266G337207 1 DTP 16Z2XW0051970 03 MAGNOLIA LOG LOADER IM9~382441435073 Homcsteader (white) Challengcr 5HABV I 6276N056493 Homestcader (blk) Hercules 5HABH I 6245N04685 I 03 UTILITY TRAILER 5EKLAI6273P006017 HAULMARK UTILITY TRLR 6HCB 12185G068863 GOOSENECK! 5TH WHEEL TRAILERS: PJ TRLR"06- 5TH WHEEL- GN353 4P5GN353 161084374 04 BIG TEX 16 VGX20245265 1932 03 AMERITRAIL FLATBED 17YGN20243B025533 07GOOSENECK CARHAULER 4P5C8263071095558 07 FALCON 16' UTILITY 432SDI62771015604 UTILITY TRAILERS: 07 BIG TEX UTILITY 16 VCX 162872073820 DUMP: 05 MAGNUM DUMP I M9BDI4205G734017 15 .... CDP EOUIPMENT LIST: BOATS NUMBER AM. AIRBOAT AMA00329D606 CAROLINA SKIFF J12 EKHK4303H506 ROOKIE FLATI4' KJG1 7A76E606 ALWELD 20' A WLC09321506 ALU PUSH BOAT 18' RED-(CJ LICK) NO VIN ALWELD 14' A WLC0437B606 CAROLINA SKIFF JI2 EKHK4301 H506 AIRBOAT AMA00326D606 18' ALU. PUSH AMA00326B606 AM. AIRBOAT AMA00330E606 ALWELD 14' A WLC0415K607 ALWELD 14' AWLC0414K607 ALWELD 14' A WLC0413K607 CAMO AIR BOAT OKSOI041HlO2 ROOKIE FLAT 14' KJG 19A 76E606 24' ALUMINUM TOUR BOAT TYMO I 969G787 SUNTRACKERI PB-18 BUU24252C999 AM. AIRBOAT AMA00333E606 14' JON BOAT 1440 JBC63067F606 21' SEACHASER EKHZ0208E505 AL WELD J BC 14480 E292 30'X8' PRTY BRG NOVIN 30'X9' EX NA VYSEAL NOVIN GOLD AIRBOAT AMA00331 E606 16' CAROLINA SKIFF EKHEI03H495 27' ADVR PRTY BRG JlB00593L687 1989- 14' ALUMACRAFT ACBZ02461889 H.HALL PARTY BARGE KA Y358390776 21' BOSTON WHALER-COBRA LAZ65502J371 ALU BOAT 12' No Vin ..., o I '""'" .., 16 :> o o "NEW ORLEANS"HPI-27B 61-594 28' "VENICE"-HPI-270 #7350 MARINElTE MARINE/A27 61-67 27' PUSHBOAT 67-74/1940004170526 25.3' STEEL HULL "BABY GIRL" WB040MIF0606 CDP EQUIPMENT LIST: BARGES NUMBER POSEIDON/IOX20 P2-105Q POSEIDON/IOX20 P2-107Q IOX20 PUSH BARGE 2-250 HONDA MOTORS POSEIDON/IOX40 Pl71M POSEIDON/IOX40 Pl68M POSEIDON/IOX40 P173M POSEIDON/IOX40 P-165 B POSEIDON/IOX40 P-157B POSEIDONI IOX40 P-118M POSEIDON/IOX40 PI69M POSEIDON/IOX40 PI67M POSEIDON/IOX40 Pl14B POSEIDONI IOX40 PI48M POSEIDON/IOX40 PI72M POSEIDON/IOX40 PI70M POSEIDON/IOX40 Pl74M POSEIDON 40XlOX5 P238M POSEIDON 40XIOX5 P233M POSEIDON/IOX40 Pl45M 12X30 WORK BARGE 8X20 STEEL WORK BARGE X 3 17X44 STEEL SPUD BARGES X 2 POSIEDON IOXlOX5 PI16RQ 17 -.... w POSEIDON JOXIOX5 PI20RQ POSEIDON IOXIOX5 Pl21RQ POSEIDON IOXlOX5 Pl22RQ BLACK. GREY. & RED/ 20X50 No Vin 90X40 RAKEFRONT BARGE 90X40 RAKEFRONT BARGE 68X26X7 STEEL SPUD # 680 I 7 80X24X5 STEEL DECK SPUD 24Xl20 SPUDS BARGE 33XIIO WORK BARGE 26X80 WORK BARGE 26X70 WORK BARGE 16X30 WORK BARGE 15X25 WORK BARGE o Proiect Mobilization Team ORC's Project Mobilization Team of Project Managers and administrative staff will be on site within 12 hours of Task Order notification prior to or immediately following a disaster event. Our mobilization team will conduct an immediate disaster assessment in coordination with GOVERNMENT staff and will begin the staging and deployment of equipment, crews, and logistical support and will determine the site location(s) in the disaster area for the company temporary field office/s, communication unit, lay-down yard and support systems, including potential emergency base camp. Evaluation surveys will be conducted by ground teams as well as by aerial survey using team helicopters. Rapid Deplovment Crews Our full project administrative staff will be on site with 24 hours of Task Order. Within 24 hours of Task Order Notice to Proceed, ORC will commence debris removal operations with 5 or more Rapid Deployment Crews. Rapid Deployment Crews will consist of 5 dump trucks of 16-20 cubic yard capacity with operators, 1 front end loader with operator, I foreman, and 3 laborers/flagmen. As necessary to open key access roads, crews of sawmen and loaders with grapples will augment the Rapid Deployment Crews. The Project Mobilization team will then rapidly augment and escalate crew strength to meet GOVERNMENT production rate targets. o Operations Mana2er The Senior Management together with the Project Management Team will assign and provide a ORC Operations Manager to the Government. The Operations Manager will henceforth be on 18 Q call and available to respond to the Contracting Officer 24 hours a day, 7 days a week throughout the life of the Task Order. The ORC Operations Manager will have full electronic linkage to the Government via cell phone, satellite phone, internet, and/or two-way radios. C) o Operational Plans Within 3 days of Task Order Notice to Proceed, ORC will furnish the contracting officer with a Management/Operations plan specific to the Task Order, with Quality Control Plan and Site Specific Safety Plan. ORC will also furnish the client with a complete Subcontracting Plan listing all subcontractors. Measurement Beginning during Mobilization, trucks and trailers used for the purpose of transporting debris will be measured by the GOVERNMENT or representative thereof. ORC will provide appropriate measurement forms as specified by the GOVERNMENT. ADMS Implementation The Project Mobilization Team will begin implementation of the Automated Debris Management System (AOMS) within 72 hours. Full implementation will be complete in no more than 30 days. DRC will provide multipart paper-based debris tracking materials until such time as the AOMS is fully implemented. DMS Establishment Within 24 hours of Task Order Notice to Proceed, personnel and equipment will be deployed to establish Debris Management Sites (OMS) at locations identified in conjunction with local governmental entities, including, but not limited to the building of roads, erecting of fences, construction of containment areas, and placement of inspection towers. Typical OMS establishment crews will consist of: Equipment: 1 Trackhoe, 2 Dozers, 2 towers, 5 16-20 cubic yard dump trucks, 1 rubber tired loader, 1 water truck, 1 motor grader Personnel: 1 Site Manager, 8 equipment operators, 2 Supervisors, 4 laborers OMS teams will also secure all necessary clearances, permits, and licenses to operate the site and will submit Site Plans to the GOVERNMENT complete with Site Specific Safety and/or Accident Prevention Plans, a Traffic Control Plan to properly manage site ingress and egress, a Dust Control Plan, and/or a Fire Prevention Plan. Within 48-72 hours, OMSs will be fully operational complete with ingress and egress points, inspection towers, water runoff protection, and containment benns and/or geotextile. Emen?:encv Command Center Facilities ORC's Project Mobilzation Team will arrive with or immediately deploy our state-of-the-art Mobile Command Center which is fully equipped with satellite phone, cell phone, and multiple desk consoles with computer networking capability, fax machine, copier, printer, public reception area, conference room and administrative supplies to be operational immediately upon 19 o o o arrival on the scene. In addition, the Mobile Command Center is self-sufficient and capable of running for days with its own electrical generator, toilet facilities and 400-gallon fuel tank. Equipment Transportation ORC and/or subcontractor and affiliate over-the-road equipment transports and operators will conduct equipment transportation. Personnel Transportation The ORC Project Mobilization Team may be air lifted to the designated location by company and/or subcontractor and affiliate aircraft. Management vehicles will provide transportation for other company personnel. Safetv Briefin2s and Inspections The company Safety Officer will conduct a safety briefing and personal protective equipment check prior to the departure of any personnel to ensure compliance with the Accident Prevention Plan as part of the Safety Plan. At the Staging Area, Safety Officers will inspect all equipment before allowing it to be mobilized. A Safety Report on equipment, personnel, and PPE will be provided to the GOVERNMENT. Temporary Housin2 and Subsistence Support Company headquarters personnel will secure temporary housing by the following priority of choice: . Rental Property . Efficiency Lodging rooms . Non-efficiency lodging rooms . Company or rental motor homes and/or travel trailers. Company headquarters personnel will secure temporary sanitary facilities III the event such facilities are inoperable in the effected area. Company headquarters personnel will assure a reliable and safe supply of food and potable water for consumption by all personnel assigned to the field. Company headquarters personnel establish and maintain an "Emergency Contact List", to include key medical infonnation for all field personnel to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. Emer2enCy Base Camp If the consequences of a disaster render the affected area incapable of accommodating basic needs such as housing, food, water, fuel, and sanitary facilities, ORC's team is fully prepared and capable to establish Emergency Base Camps to house and support as many as 1000 disaster response personnel. ORC has extensive experience supporting governmental agencies in emergency response having participated in over 70 emergency response events. ORC Emergency Services' resources will be augmented by experienced management and logistics 20 o o Ie teams from Base Logistics. Together, our companies have extensive experience in support of governmental operations, life support contracts, and post disaster environments. ORC/Base wiIl deploy a Camp Program Manager on-site to provide oversight, execution, and quality control and will assign a command center response manager to each camp to coordinate sufficient staffing, resources, equipment, and supplies to each site from a central location. Within 72-96 hours, ORC and Base Logistics will establish a fully operational base camp for up to 1 000 persons within a disaster area. Camp will operate 2417; operate for 30 or more days; and is approximately 2-10 acres. Fuel Supply ORC headquarters personnel will have established a list of emergency fuel suppliers in any and all awarded region for use by field maintenance/fuel personnel. Field maintenance/fuel personnel shall prepare their assigned maintenance/fuel vehicles for deployment in accordance with the appropriate inventory and safety checklists. In addition, ORe's Team associates in the Cahaba Group maintain standing fuel supplies of 50,000 gallons of diesel fuel and 5,000 gallons of gasoline, as well as 3 fuel tanker trucks, centrally and safely located inland in the Southeast United States for immediate mobilization in areas affected by fuel shortage. Personnel Trainim! All personnel records (management, supervisors, foremen and laborers) shall be reviewed prior to deployment of personnel, to ensure all personnel have documentation of current training for each position that they could be assigned (in accordance with OSHA, EP A, and other applicable regulations and standards). EMERGENCY DEBRIS CLEARANCE (PUSH) As tasked by the GOVERNMENT, ORC will provide Emergency Road Clearance which involves the emergency clearing, cutting, tossing and/or pushing of debris from the primary transportation routes to the medians or sides of the public rights-of-way (ROW). Under direction of the GOVERNMENT, ORC crews will work independently or in conjunction with GOVERNMENT crews to temporarily clear debris from pre-designated critical arteries to facilitate the movement of emergency vehicles and other critical traffic in the immediate aftermath of a disaster. Only a single lane is usually cleared at first with the additional lanes being cleared according to the needs and requirements of the affected community. In addition, entrances and routes to hospitals and emergency service facilities, such as fire and police departments, are given priority for this emergency debris and fallen tree clearance. The equipment utilized in this operation can include, but is not limited to: large rubber tired loaders with grapples or rakes; small bobcat type loaders to access narrow areas; and other specialized clearing equipment as may be required by local conditions. Additionally, service trucks for maintenance and/or fuel and vehicles for personnel transportation and supervision are 21 o required. Personnel, such as heavy equipment operators, truck drivers, and operators with chainsaws, general laborers with tools, flagmen, mechanics, supervisors, and project managers are usually required. This operation is accomplished when time is of the essence, norn1ally within the first 72 (plus or minus) hours after an event. Although this is a time critical operation, safety of personnel and the general public is paramount to a successful operation. Extreme caution must be exercised during this phase of the debris management operation to avoid downed live electrical wires and other such dangerous circumstances. Once this task is accomplished, or coinciding with the progress of this task, debris removal from public easements, property and rights-of-way begins. EMERGENCY PUSH EQUIPMENT AND CREWS ORC FIELD SUPERVISORS/CREW FOREMEN - Field supervisors will report to the senior field supervisor/project manager. All supervisors will be responsible to ensure work is conducted only in those areas designated by the government. Supervisors will not allow work to commence in additional areas until directed by government task order. Supervisors shall be responsible for the safety of all personnel and equipment. Supervisors will be responsible for collection of daily personnel and equipment time logs, and their distribution to the Company designated representative with a copy given to the government. Crew foremen will report to their designated supervisor. Foremen will be responsible to ensure work assignments received from their supervisor is completed to the requirement of the government task order. Foremen o will be responsible for maintaining the daily personnel and equipment time logs. EQUIPMENT CREWS As required by Mobilization Task Order, ORC shall provide equipment, with operators and laborers, for debris clearance and all labor, equipment, tools, and materials necessary to fully operate and maintain (including fuel, oil, grease and repairs) the following: I) Dump Trucks, 16-20 yd3 capacity, with Operator 2) Front-end and/or Grapple Loaders, 3-5 yd3 capacity, with Operator 3) Three (3) Person Laborer Crews with Chainsaws, 16"min bar, traffic flags, and misc. small tools (axes, shovels, safety equip., etc.) 4) Pickup Trucks, 12-1 Ton, with crew foreman, and cellular phones. Other crews and equipment typically deployed: . Rubber tire loaders with blades, buckets or grapples. . Rubber tire loaders with rakes will be used where needed. . Rubber tire excavators will be used where needed. . Track equipment will not be utilized unless tasked by the government. . Excavators with street tracks and thumbs can be utilized if required/approved by government tasking. o HAND CREWS - CHAINSA W CREW - 1 or 2 laborers with sufficient hand tools will assist a chainsaw operator. 22 o o I I I '0 I MAINTENANCE/FUEL VEHICLES AND PERSONNEL - Maintenance/fuel vehicles will be assigned and manned as needed to provide an adequate supply of fuel to maintain equipment operations. Maintenance/fuel vehicles will be assigned and manned as needed to provide all required field maintenance to ensure equipment operations. LABOR CREW - 1 or 2 laborers with sufficient hand tools will accompany each piece of heavy equipment. OPERA TIONS . Clear debris from roads in the order of and number of lanes as tasked by GOVERNMENT. . Clear debris from parking lots, areas of ingress and egress and any other area of hospitals, shelters, emergency operations center, etc. as tasked by the GOVERNMENT. . The priority of this operation is to clear the debris. . Operators and hand crews will be instructed to perform in a workman like manner to prevent damage to salvageable and/or undamaged property and prevent personal injury to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. . Attempt to make roadways and intersections as safe as possible from sight and traffic obstructions to ensure compliance with the Accident Prevention Plan and Site Specific Safety Plan. . All supervisors will maintain personnel and equipment hours on a per day basis. DEBRIS REMOVAL (LOAD AND HAUL) OPERA TIONS - All debris will be picked up and loaded into haul trucks in a safe and workman-like manner to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. Safety will not be compromised. All crew foreman and field supervisors will be responsible to ensure a rapid and cost effective as possible operation. Hand crews, to ensure maximum loading and safe transport of material, will size all vegetative debris. All construction and demolition materials will be sized using heavy equipment to ensure maximum loading and safe transport of materials within EP A and DOT standards. Obvious hazardous materials will be dealt with in accordance with the Government task order and the Corporate Environmental Protection Plan and in compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. Traffic control personnel, with appropriate traffic control safety equipment, will be stationed at each approach point of the work area to maintain traffic control and prevent personal injury to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. Additional traffic control personnel will be stationed throughout the area, as needed, to ensure safe operations. This operation specifically entails the recovery and removal (pick-up and hauling) of all eligible debris from public easements, property and rights-of-way to designated Debris Management Sites and/or directly to a final disposal site. Eligible debris is typically that debris which was 23 o o G either generated directly by the event or as a result of the event, and is in the public Right of Way and not on private property: 1. Vegetative debris (stumps, logs and limbs) 2. Construction and demolition (C&D) debris 3. Metallic debris 4. White goods (refrigerators, air conditioners, washers and dryers, etc.) 5. Electronics 6. Household Garbage 7. Hazardous and toxic wastes (HTW) (industrial, commercial and household) 8. Asbestos Containing Material (ACM) The equipment and personnel utilized for each operational phase will vary by the type, quantity and location and proposed disposal and/or reduction method of the debris. In all operations, regardless of type of debris, appropriate personal protective equipment for personnel is critical and will be employed. ORC will cover loads with tarpaulins to contain debris. Crew Dispatch Crews will be staged and dispatched according to GOVERNMENT direction and pnontIes. Daily meetings between DRC and the GOVERNMENT will establish sectional and zonal priorities which, in turn, will be communicated to centrally staged foremen and crews. Progress will be monitored and reported on a daily basis through DRC's Area Management Program. Additional passes through each zone and section will be staged to allow residents the time to bring debris to the ROW. ORC will also utilize a Hot Spot Crew for rapid deployment to areas of need. The Hot Spot Crew will consist of 2 laborers/flagmen and one sawman, one foreman, and one self-loader or knuckleboom loader. ORC Debris Removal Crews will work daylight hours only, 7 days a week. All trucks and equipment used for debris removal will be in compliance with all local, state, and federal requirements. All equipment used to haul debris will be mechanically loaded and equipped with a tailgate that will contain debris during transport and facilitate effective dumping at the debris management site. Beginning during Mobilization, trucks and trailers used for the purpose of transporting debris will be measured by the GOVERNMENT or representative thereof. DRC will provide appropriate measurement forms as specified. At the Staging Area, Safety Officers will inspect all equipment before allowing it to be mobilized. A Safety Report on equipment, personnel, and PPE will be provided to the GOVERNMENT. 24 - o Segregation of Debris If differing types of debris are commingled and or not previously segregated by property owners, debris segregation must be accomplished before debris removal can take place. For this purpose, ORC will deploy debris segregation crews. Typical ORC segregation crews will include 1 foreman, 3 laborers, and I Bobcat loader with grapple. Proper segregation will place each type of debris listed above in its own discrete aggregation, safely out of roads, streets, sidewalks, and other means of travel, but still aggregated on public rights of way and easements, easily accessible to removal vehicles and crews, and clear of private property. Right of Wav Clearing Within 24 hours of Task Order Notice to Proceed, ORC will commence debris removal operations with 5 or more Debris Removal Crews. Debris Removal Crews will typically consist of 5 dump trucks of 16-20 cubic yard capacity with operators, 1 front end loader with operator, 1 foreman, and 3 laborerslflagmen. As necessary or directed by the GOVERNMENT, crews will be augmented by equipment and personnel detailed below in order to accomplish removal of specific types of debris. o Major debris types and specialized requirements are detailed below. A. Vegetative Debris Vegetative debris operations equipment may include, but is not limited to: rubber tired loaders with buckets, rakes, grapples, or 4 in 1 buckets; rubber tired excavators with grapples or thumbs; telehandlers; track type loaders with rakes, grapples or 4 in 1 buckets (to be utilized only under certain pennitted conditions); trailer or truck mounted knuckle booms with grapples or clam shells; self-loading trucks (knuckle boom with grapples or clam shells); fann type tractors with box blades, flat blades or brooms; bobcat type loaders; bucket trucks with 50' booms for hazardous tree and limb trimming; 30 ton or larger cranes to remove heavy stumps and or trunks; haul trucks ranging in size from 16 to 120 cubic yard capacity; roll-off dumpsters; flat-bed tractor trailers to transport equipment or stumps and oversized tree trunks, fuel and service trucks. Vegetative debris operations personnel requirements may include, but are not limited to, equipment operators; superintendents with trucks; foremen with trucks; operators with chainsaws; traffic control personnel; general laborers with tools; safety personnel; mechanics; hazardous materials technicians; documentation personnel; quality assurance personnel and project managers. It is the policy of ORC to maintain all debris work sites at the appropriate use standards, safety standards, and regulatory requirements. Debris removal operations should be closely overseen C by GOVERNMENT or GOVERNMENT-approved representative and/or foreman on-site during 25 o w I r""\ .., all working hours. These representatives are to ensure and document the removal and recovery of only eligible debris and should initiate the multi-part debris documentation program. B. Construction and Demolition (C & D) Debris C&O debris operations may utilize the same equipment as listed above for vegetative debris. Curbside separation by the contractor and public can be very important to ensure proper segregation of vegetative from C & 0 debris and to attempt to segregate any hazardous and/or household hazardous waste. A debris pick-up and haul operation that is primarily focused on C&O debris may also require equipment such as: 0-6 or larger dozers; track-type excavators with impact hammers, electromagnets and/or concrete shears and/or grapples, and other specialized equipment to segregate or prepare the debris for transport. The personnel requirements for C&O debris operations are similar if not identical to those of vegetative debris operations. ORC and its subcontractors own or have access to the equipment required for these services, including front-end loaders, excavators, rubber-tired backhoes, most with grapples or 4 in 1 buckets, knuckle boom loaders, dump trucks, dump trailers and service trucks. C. Metallic Debris and White Goods White goods can present a difficult dilemma to the recovery efforts. If the white goods contain Freon, this Freon must be removed before it is accidentally released into the air in violation of the U.S. Environmental Protection Agency regulations. Typically, white goods are moved to debris management sites prior to Freon removal so the removal activities can be more effectively monitored and thoroughly controlled. Freon is then removed by a licensed Freon recycler and the white goods are crushed or shredded in the recycling program. White goods recovery (pick-up and haul), with the exception of white goods requiring Freon recovery, is treated and accomplished as though it were either C&D debris or recyclable debris, dependent upon the final disposal source. Each Freon containing piece of white goods should be hand or mechanically loaded in such a way as to not allow crushing of the Freon lines or premature release of the Freon. Equipment and personnel would also be treated as a C&O debris or recyclable debris operation, dependent upon the final disposal source. ORC has extensive experience with white goods and Freon recovery. ORC recovered, shred and removed an estimated 80,000 pieces of white goods in one major storm alone. Removal of Freon, chemicals, food, and/or fluids from white goods will be accomplished only by properly licensed and credentialed personnel. O. Hazardous and Toxic Waste Hazardous and toxic waste (HTW) is a special operational aspect that must be accomplished with very precise, pre-established standards and regulations. Safety to the workers, government employees and the citizens of the area is paramount. With this in mind, ORC works with its specialized subcontractors to establish and implement proper handling procedures for HTW, including household hazardous waste, which, after a disaster, may become concentrated and no longer considered diminimous. These procedures include the segregation and removal of HTW 26 o o G from the debris stream at the curbside, prior to the recovery of other debris and sorting and additional recovery of HTW within each TDSR site. Recovered HTW is removed to a proper disposal site or temporarily stored in the HTW disposal areas constructed within each TOSR site as required. HTW must be collected, handled and disposed of by specially trained HAZMA T technicians. In addition, ORC may utilize national or regional firms who are fully licensed and accredited to manage, handle and dispose of HTW. These firms may be utilized by ORC and/or ORC Environmental, Inc. for professional and immediate HTW recovery support on an emergency basis. E. Asbestos Containing Materials Known or suspect asbestos containing material will besegregated from other debris and handled only by licensed and certified asbestos contractor/supervisors, of which ORC has 5 on staff. ACMs will be encapsulated for hauling, typically in a "burrito" style containment or wrap, and brought directly to an asbestos accepting disposal facility. In sum, all special wastes will be handled according to the removal and disposal specifications of the GOVERNMENT and will confonn to all local, state, and federal environmental, legal, and transportation regulations and will be performed only by licensed, certified, and otherwise properly credentialed personnel and/or subcontractors. DEBRIS REMOVAL FIELD PERSONNEL FIELD SUPERVISORS/CREW FOREMEN - Field supervisors will report to the senior field supervisor. All supervisors will be responsible to ensure work is conducted only in those areas designated by the government. Supervisors will not allow work to commence in additional areas until directed by government task order. Supervisors shall be responsible for the safety of all personnel and equipment. Supervisors will be responsible for collection of daily personnel and equipment time logs, and their distribution to the Company designated representative with a copy given to the government. Crew foremen will report to their designated supervisor. Foremen will be responsible to ensure work assignments received from their supervisor are completed to the requirements of the government task order. Foremen will be responsible for maintaining the daily personnel and equipment time logs. MAINTENANCE/FUEL VEHICLES AND PERSONNEL - Maintenance/fuel vehicles will be assigned and manned as needed to provide an adequate supply of fuel to maintain equipment operations. Maintenance/fuel vehicles will be assigned and manned as needed to provide all required field maintenance to ensure equipment operations. HAND CREWS - 1 - 2 laborers with sufficient hand tools will accompany each piece of heavy equipment where necessary. DEBRIS HAULING Debris hauling will consist of 2 distinct operations as follows: 27 o o G - . Hauling of unreduced debris from origination point to debris management sites. . Hauling of reduced debris from debris management sites to final disposal site. . Hauling of unreduced debris from origination point to final disposal with no intermediate stops. Construction and demolition debris, as well as special wastes, may require hauling directly to final disposal site from point of origination, if reduction of construction and demolition is prohibited by Local, State or Federal EP A standards. Otherwise, C&O Debris can be staged at TOSRS for speedy recovery than transferred to approved final disposal sites. All field supervisors will ensure that all hauling operations comply with Local, State and Federal DOT standards in effect at that time and ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. FIELD SUPERVISORS/CREW FOREMEN - Field supervisors will report to the senior field supervisor. All supervisors will be responsible to ensure work is conducted only in those areas designated by the government. Supervisors will not allow work to commence in additional areas until directed by government task order. Supervisors shall be responsible for the safety of all personnel and equipment. Supervisors will be responsible for collection of daily personnel and equipment time logs, and their distribution to the Company designated representative with a copy given to the government. Supervisors will be responsible for collecting load/haul tickets and daily loadlhaul logs from haul truck operators. The supervisor will complete fonns. Crew foremen will report to their designated supervisor. Foremen will be responsible to ensure work assignments received from their supervisor are completed to the requirements of the government task order. Foremen will be responsible for maintaining the daily personnel and equipment time logs. EQUIPMENT CREWS - Debris hauling equipment will include, but is not limited to: . 16-20 cubic yard dump trucks . 21-30 cubic yard dump trucks . 30-50 cubic yard tractor trailers . 50-75 cubic yard tractor trailers . 75-100+ cubic yard tractor trailers . Roll-off dumpsters . Other specialized hauling equipment Past experience has shown that the farther the haul distance, larger capacity trucks are more cost effective. Haul truck bed configurations - All haul truck beds shall be equipped with tailgates constructed of materials (i.e.- chain link fence, safety fence, etc.) that will safely contain debris, allow each haul truck to be loaded to it's capacity and also allow rapid dumping of debris from the bed. Any haul truck bed that has or will have vertical extensions installed, will comply with the 28 () o G following restrictions. Haul truck bed extensions shall comply with all applicable Local, State and Federal laws. Bed extensions, when installed, will be located and secured to the front-end, left side and right side of the bed. Bed extensions shall not extend beyond 24 inches above the manufacturers bed height. Bed extensions will be constructed of not less than 2" x 6" lumber placed flush against the manufacturer's bed and each subsequent piece of lumber to withstand loader impact. Lumber will be secured to the manufacturer's bed with angle or channel iron and bolts. Each side extension will be secured with metal brackets and bolts to the front-end extension. All supervisors will utilize the check sheet provided by The Company Safety Officer to ensure all safety equipment is maintained and operable on all debris hauling equipment to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. MAINTENANCE/FUEL VEHICLES AND PERSONNEL - Maintenance/fuel vehicles will be assigned and manned as needed to provide an adequate supply of fuel to maintain equipment operations. Maintenance/fuel vehicles will be assigned and manned as needed to provide all required field maintenance to ensure equipment operations. OPERA nONS - All field supervisors shall ensure that all debris-hauling operators are licensed and/or certified to operate required equipment. All debris-hauling operators will be given area maps designating assignment/authorized areas of operations as well as transport routes designated and/or approved by the GOVERNMENT. All debris haul operators shall visibly display colored signs provided by the Company. The Company signs are affixed on the driver and passenger doors of the vehicle cab and are at least 12 inches by 16 inches in size. Any signs provided by the government will be displayed on both sides of the forward most section of the vehicle bed, unless otherwise directed by the task order. Colored paper signs/passes will be displayed in the driver's side windshield of each vehicle. Each sign/pass will contain the following information: . Company Logo . Prime Contractor . Subcontractor . Truck Number . Cubic Yard Capacity or Tare Weight . Name of Inspector and Inspection Date All debris haul operators shall maintain the numbered debris hauling/transportation documentation/verification forms. All supervisors will be responsible to ensure that all employees utilizing and/or inputting information on the form are procedurally trained. It will be each supervisor's responsibility to maintain a supply of the required number of forms. Forms will be distributed by supervisors/foremen to debris haul operators during debris pick-up operations after completing appropriate forms. All debris haul operators will maintain daily ticketlhaul records to be turned into field supervisors, with copies of load tickets at close of business each day. 29 o o ....... I ., TEMPORARY DEBRIS STAGING AND REDUCTION SITE MANAGEMENT Site Establishment DRC shall provide all specified equipment, operators, and laborers for dumpsite management, debris reduction operations, and provision of an Automated Debris Management System. Within 24 hours of Task Order Notice to Proceed, personnel and equipment will be deployed to establish Debris Management Sites (OMS) at locations identified in conjunction with the GOVERNMENT and local governmental entities, including, but not limited to the building of roads, erecting of fences, construction of containment areas, and placement of inspection towers. At minimum, the OMS equipment and crews will consist of: Air Curtain Incinerator, 1 Trackhoe, 2 Dozers, 2 towers, 5 16-20 cubic yard dump trucks, 1 rubber tired loader, 1 water truck, 1 motor grader, Tub Grinder, 1 Site Manager, 1, Night Manager, 8 equipment operators, 2 Supervisors, 5 laborers, Light Plants, HTW containment systems. OMS teams will also secure all necessary clearances, permits, and licenses to operate the site and will submit Site Plans to the GOVERNMENT complete with Site Specific Safety and/or Accident Prevention Plans, a Traffic Control Plan to properly manage site ingress and egress, a Dust Control Plan, and/or a Fire Prevention Plan. Within 48-72 hours, OMSs will be fully operational complete with ingress and egress points, inspection towers, water runoff protection, and containment berms and/or geotextile. Site selection will typically be the responsibility of the GOVERNMENT or can be accomplished by ORC in conjunction with the GOVERNMENT. Site locations are nonnally reviewed and approved in advance for future disaster events. Site selection criteria includes ownership (privately owned vs. the preferred government owned site), size requirements based on quantity of debris projected, location within or in the proximity of the affected area, and the history of the site (such as historical or archaeological significance, environmental impact, security considerations and proximity to the general public). ORC normally operates and manages an appropriate number of TOSR sites strategically located throughout the disaster area to accept and process all categories of debris. Primary site preparation may include, but is not necessarily limited to, construction and maintenance of primary roads for ingress or egress, and any roads required within the site, environmental requirements, inspection and observation towers, wind-blown debris control fencing, silt fencing and stonn-water retention and diversion berms. To facilitate the documentation and quality control system utilized by DRC, a sturdy roofed inspection towers are constructed and/or delivered during this early phase of site preparations. DRC also typically constructs an area for office trailers and parking for administrative personnel, inspectors and GOVERNMENT personnel. 30 ... o The inspection of every load, in and out, is critical to the documentation of the overall process. The TOSR site inspection towers are the location of the load verification and documentation programs of all incoming and, later outgoing, debris. Once documented, all debris is processed in accordance with applicable local, state and federal rules, standards, and regulations. CREW AND EQUIPMENT DETAIL FIELD SUPERVISORS/CREW FOREMEN - Field supervisors will report to the senior field supervisor. Debris staging site supervisors will be responsible for management of all operations of the debris staging site to include site safety, haul load inspection, segregation, traffic control, dumping, reduction, security and remediation. Supervisors shall be responsible for the safety of all personnel and equipment to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. Supervisors will be responsible for collection of daily personnel and equipment time logs, and their distribution to the Company designated representative with a copy given to the government. Supervisors will be responsible for collecting loadlhaul tickets and daily load/haul logs from haul truck operators. Inspection tower personnel will complete the forn1s. Crew foremen will report to their designated supervisor. Foremen will be responsible to ensure work assignments received from their supervisor are completed to the requirements of the government task order. Foremen will be responsible for maintaining the daily personnel and equipment time logs. o EQUIPMENT - Debris staging site equipment may include but is not limited to the following: . Excavators with thumb . Track type tractors with root rakes . Track type tractors with push blade . Fann type tractor with box blade . Motor grader . Rubber tire loader . Tub grinder . Brush chipper . Air curtain burner All equipment will meet current safety standards. MAINTENANCE/FUEL VEHICLES AND PERSONNEL - Maintenance/fuel vehicles will be assigned and manned as needed to provide an adequate supply of fuel to maintain equipment operations. Maintenance/fuel vehicles will be assigned and manned as needed to provide all required field maintenance to ensure equipment operations. HAND CREWS(EACH) - 2-3 laborers with sufficient hand tools will accompany each piece of heavy equipment. J I DEBRIS STAGING SITE KEY STEPS - The following information will be utilized to create a location specific site management plan and site safety plan to accompany this plan. 31 ~ o SITE ACCESS - Separate points of ingress and egress should be established if possible. Temporary acceleration and deceleration lanes should be established adjacent to the primary road leading to and from site access points, if approved by Government and appropriate authority having jurisdiction over primary road right-of-way. All temporary roads leading to and through the debris-staging site should be constructed and maintained for all weather use (i.e. - rock laid roads). INSPECTION TOWERS - Inspection towers shall be constructed to facilitate observation and quantification of debris hauled for storage at debris staging sites. No less than two inspections towers should be utilized at each debris-staging site. One tower at point of ingress for use by company inspector and Government inspector, one tower at point of egress to ensure all debris hauling trucks are in fact empty upon leaving the site, one tower may be utilized if ingress and egress point is the same. The egress tower should be manned by at least a representative of The Company. An example blueprint, construction of, and design of a typical inspection tower for GOVERNMENT operations is attached at the end of this plan. TRAFFIC CONTROLS - Traffic control personnel, with appropriate traffic control safety equipment, will be stationed at the ingress observation tower to maintain vehicular and pedestrian traffic control. Additional traffic control personnel will be stationed throughout the site, as needed, to enforce proper dumping and prevent personal injury to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. o CLEARING AND GRADING - Clearing and grading of debris staging sites will be accomplished, to the level required, in accordance with the site management plan and task order from the Government. ENVIRONMENT AL PROTECTION - The Company's "Environmental Protection Plan", which incorporates such issues as erosion control, hazardous and toxic wastes, dust and smoke control (Clean Water Act, Storm Water Act, Resource Conservation and Recovery Act, Superfund Amendments and Reauthorization Act and others), is incorporated in full by attachment at the end of this plan. Environmentally sensitive areas (i.e. - wetlands, habitat, historical sites, etc.) within, or in proximity to, a debris staging site, will be avoided, designated as sensitive, protected, and access restricted to the extent possible, from adverse impact. Activity within environmentally sensitive areas will be prohibited. All requirements of pertinent environmental standards will be complied with. DEBRIS STORAGE AREAS - Debris will be segregated into 5 main areas of concern as follows unless otherwise instructed by the Government. Q . Vegetative debris - Vegetative debris will be cleaned of C&O debris to the extent possible to facilitate compliance with requirements for reduction of vegetative debris. . Construction and Demolition (C&O) Debris - C&O debris will be dampened prior to dumping and periodically as needed, to comply with Local, State and Federal EP A standards. . Recyclable/salvage - Recyclable/salvageable materials will be stock piled in accordance with Government task order. 32 o o o . White goods - White goods will be stock piled in accordance with Government task order. . Hazardous and/or toxic wastes (HTW) - HTW will be segregated and stored in a Government approved containment area. All site personnel will receive a safety briefing regarding operations involving HTW to prevent personal injury and ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. HTW containment site perimeter will be posted and secured for personnel safety. An example template for Construction & Design of HTW containment site is attached at the end of this plan. SAFETY PRECAUTIONS Water Trucks - The required number of water trucks will be stationed at each debris-staging site. Water trucks will be utilized to reduce the threat of friable materials from C&D debris being released into the atmosphere. Water trucks will be utilized to reduce the threat of fire from all types of debris. If necessary, water trucks will be utilized in fire suppression operations. Water trucks will be utilized to dampen areas, including temporary roadways, to suppress dust from trucks entering and leaving the debris-staging site. Fire Extinguishers - Fire extinguishers will be located throughout each debris-staging site as required by the site management plan, site safety plan, OSHA requirements and government task order. All debris staging site personnel will be trained in incipient fire suppression operations and safety procedures, to include operation of fire extinguishers and water trucks and to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. DEBRIS SEGREGATION DEBRIS SEGREGATION A T STAGING SITES - Staging site supervisors will ensure that all debris haul operators deposit debris in areas designated for the type debris hauled. Debris hauled to staging sites in mixed loads will be segregated by heavy equipment when possible and by hand crew when necessary. Vegetative debris will be placed into two separate piles. The first pile (pile one) will be the dumping point until a sufficient quantity has been accumulated to commence a continuous reduction operation. Pile two will be started and accumulated until the reduction of the pile one has been completed. At which time, dumping of vegetative debris on pile two will cease and pile one will be replenished. This rotation will continue until the task is completed. All personnel involved in vegetative debris segregation operations will receive a safety briefing for all effected job to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. C&O debris will be placed into one or more piles, as required, to reduce the threat of a fire conflagration until it is reduced or disposed. The Company will consult with the government, local fire officials and pertinent environmental officials regarding the requirements for stock piling of C&O debris. White goods will be segregated, as required by the government task order. White goods will be placed and stored until instructed by the government as to its final disposition. Salvageable/recyclable materials 33 o will be segregated, as required by the government task order. Salvageable/recyclable materials will be placed and stored until instructed by the government as to its final disposition. HTW will be segregated and stored in a Government approved containment area. All site personnel will receive a safety briefing regarding operations involving HTW. The HTW containment site perimeter will be posted and secured for personnel safety and to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan as well as the Corporate Environmental Protection Plan (EPP). HTW will be placed and stored until instructed by the government as to its final disposition. PROCESSING o Processing may include, but is not limited to, reduction by tub grinding and/or chipping, incineration when approved, or other alternate methods of reduction such as compaction, baling, separation, recycling, crushing or shredding. Prior to reduction operations being undertaken, all debris is nonnally segregated between vegetative debris, construction and demolition debris (C&O), recyclable debris, white goods and hazardous and toxic wastes (HTW). Further detailed segregation of materials by classification (tires, batteries, metals, roofing materials, etc.) is often required. This segregation operation utilizes both manpower and specialized equipment. The equipment could include front-end loaders and trackhoes with buckets, grapples and/or Electro- magnets, mechanical screens, and/or knuckle boom loaders to segregate burnable from non- burnable debris. The manpower requirements are primarily supervisors, equipment operators, mechanics, flagmen, inspectors and general laborers, with the exception of the hazardous materials/operation, which requires specially trained and equipped technicians. An experienced site manager, in conjunction with reduction, sorting, hazardous materials, recycling and safety supervisors, manage, operate and supervise the day-to-day site operations. All reduced debris, as well as non-reducible debris, is recycled, destroyed or disposed of at permitted (if required) recycling or disposal sites, as directed by the contracting authority. Processing of debris is a critical element in a successful TOSR operation. The proper processing techniques applied to the appropriate debris type can streamline production and reduce overall cost. Tub grinding and/or chipping is believed to be the most environmentally friendly form of volume reduction for vegetative and select C&O debris and produces an average of 4: 1 or greater reduction in volume. The chips produced as a product of grinding and/or chipping can often be utilized as a recyclable product. Chips can be utilized as daily cover in a landfill operation, given away as a landscaping product to the general public, given away or after-marketed to an incineration facility as a fuel source, utilized as an agricultural supplement, and in numerous other uses. :) Incineration is another cost effective reduction technique and can produce as much as a 95% reduction in overall burnable debris volume. Although the least environmentally friendly option, open air burning has been successfully utilized by ORC when directed by clients. The typical vegetative natural disaster debris, when open-air burned creates substantial smoke and air pollution. Air-Curtain incineration, however, by design, eliminates the majority of particulate and smoke pollution while increasing the bum rate volume. Air-Curtain Incineration can be 34 o 10 I :) accomplished through the construction of an underground bum pit, the construction of an above ground bum pit or by the utilization of a pre-fabricated portable incineration unit. DEBRIS REDUCTION This section discusses guidelines to be followed during debris reduction operations not already addressed in this plan. If required by a government task order or notice-to-proceed, night operations may be conducted. Night operations shall be limited to reduction of debris by burning. Night operations shall only be conducted upon a determination by the Company Safety Officer, and concurrence by the government, that such operations can be conducted in a safe manner. BURNING OPERA nONS Open Air Burning - Open air burning of disaster related debris is prohibited by and within numerous jurisdictions. Open air burning will be accomplished on vegetative debris and/or clean woody debris only when directed by government task order. Under no circumstance will open air burning be conducted on C&O debris that is known, considered or suspect, by the government and the Company, to contain environmental/health hazardous materials (i.e. asbestos, arsenic, etc.). All appropriate fire protection measures will be established and maintained in accordance with the site management plan, site safety plan and the government task order. All personnel involved in open air burning operations will receive safety training pertaining to this to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. Open air burning will be conducted above ground level. No open air burning will be conducted within 1000 feet of a structure or within 100 feet of the debris pile. An area of not less than 100 feet surrounding each bum site will be cleared of all combustible materials and marked to delineate the area as restricted. Air Curtain Burning - Air curtain burning of debris is the preferred method of the Company. Air curtain burning will be accomplished on vegetative debris and clean woody debris only, unless otherwise directed by government task order. Under no circumstance will air curtain burning be conducted on C&O debris that is known, considered or suspect, by the government and the Company, to contain environmental/health hazardous materials. All appropriate fire protection measures will be established and maintained in accordance with the site management plan, site safety plan and the government task order. All personnel involved in air curtain burning operations will receive safety training pertaining to this to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. Air curtain burning will be conducted below ground level in a below ground pit, and above ground when geographically necessary. If above ground burning is required it will be conducted in an approved container suitable for the operation. If a below ground pit is used the pit shall be at least 8 feet, and no more than 20 feet, in depth and will be no wider than 1.1 times the width of the air curtain nozzle, and no longer than 10-12 feet (15 feet maximum). No air curtain burning will be conducted within 1000 feet of a structure or within 100 feet of the debris pile. An area of not less than 100 feet surrounding each bum site will be cleared of all combustible materials and marked to delineate the area as restricted. All burning will be accomplished as set out in the US Anny Corps of Engineers "DISASTER GUIDEBOOK" 35 o Q f;;; Ash Disposal Area - At the end of each burning cycle, the ash residue from the burning operations shall be removed from the burning area and placed in a pre-identified Ash Disposal Area. The burning operations personnel will utilize this area to temporarily store the ash material prior to final disposal. The ash residue will be tested in accordance with the soil testing procedures located in the EPP to establish the need to install a ground-water protection barrier in the Ash Disposal Area. Should a liner be required, an impervious layer of clay and/or limestone should be utilized to protect the aquifer (ground water) from potential contamination. This liner should be replaced and reinstated should it be disturbed or removed by heavy equipment operations. Control of dust produced as a result of handling and/or the storage of ash residue will be accomplished in accordance with the appropriate requirements of the EPP. Once the ash residue has reached a quantity requiring disposal, samples of the ash will be taken and examined in accordance with the EPP, to establish the requirements for disposal (Class I Subtitle 0 Landfill vs. Class III Landfill vs. agricultural recycling techniques). GRINDING and/or CHIPPING OPERA TI0NS- Grinding and/or chipping operations will be accomplished on all vegetative debris, not reduced by burning operations. Grinding and/or chipping operation is the preferred method of reduction for vegetative debris to accomplish environmental resource conservation through recycle/salvage of wood chips. Although this operation is preferred for environmental purposes, it is, however, the most time consuming and costly reduction operation due to material handling and haul disposal costs after grinding and/or chipping operations have been accomplished. Grinding and/or chipping operations of C&O materials are prohibited by and within numerous jurisdictions. Grinding and/or chipping operations will be accomplished on the type of debris (vegetative and/or C&O) as directed by government task order. Grinding and/or chipping of vegetative debris will be accomplished on the piles of vegetative debris as set out below. Vegetative debris will be placed into two separate piles. The first pile (pile one) will be the dumping point until a sufficient quantity has been accumulated to commence a continuous reduction operation. Pile two will be started and accumulated until the reduction of the pile one has been completed. At which time, dumping of vegetative debris on pile two will cease and pile one will be replenished. This rotation will continue until the task is completed. All personnel involved in vegetative debris grinding and/or chipping operations will receive a safety briefing for all effected job functions. A track-type tractor with blade or a rubber tire loader will pick-up, and stockpile chips for temporary storage. Chips will be loaded out and hauled to a final disposal site as quickly as possible to reduce the threat of a fire conflagration. All appropriate fire protection measures will be established and maintained in accordance with the site management plan, site safety plan and the government task order. Water trucks will be utilized to reduce the threat of fire from all types of debris. If necessary, water trucks will be utilized in fire suppression operations. 36 o !o " "- Fire Extinguishers - Fire extinguishers will be located throughout each debris-staging site as required by the site management plan, site safety plan, OSHA requirements and government task order. All grinding and/or chipping operations personnel will be trained in incipient fire suppression operations and safety procedures, to include operation of fire extinguishers and water trucks to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. MAINTENANCE/FUEL VEHICLES AND PERSONNEL - Maintenance/fuel vehicles will be assigned and manned as needed to provide an adequate supply of fuel to maintain equipment operations. Maintenance/fuel vehicles will be assigned and manned as needed to provide all required field maintenance to ensure equipment operations. DEBRIS DISPOSAL Debris disposal is the pre-planned, pre-approved operation of placing debris in its final resting- place. Debris disposal operations can be segmented into three distinct operations: . Haul to and tip at debris disposal site . Physical operation of debris disposal site . Augmentation of debris disposal site pennanent staff and equipment DISPOSAL SITE (S) - A disposal site may be a dump and/or a landfill owned and operated by private or public sectors. Nonburnable debris will be disposed only at a dump and/or landfill designated to receive materials other than toxic hazardous waste. EQUIPMENT - Debris disposal hauling equipment will include, but not limited to: . 16-30 cubic yard dump trucks . 30-100 cubic yard tractor-trailers or other such haulers as the government may direct. Past experience has shown that the farther the haul distance, larger capacity trucks are more effective. 08.1.6) All haul truck beds shall be equipped with tailgates constructed of materials (i.e. - chain link fence, safety fence, etc.) that will safely contain debris, allow each haul truck to be loaded to it's capacity and also allow rapid dumping of debris from the bed. Any haul truck bed that has or will have vertical extensions installed, will comply with the following restrictions. · Disposal haul truck bed extensions shall comply with all applicable Local, State and Federal laws. · Bed extensions, when installed, will be located and secured to the front-end, left side and right side of the bed. . Bed extensions shall not extend beyond 24 inches above the manufacturers bed height. . Bed extensions will be constructed of not less than 2"x6" lumber. 37 o 10 All disposal trucks shall be pre-measured and accepted by the government before being utilized in debris removal operations. MAINTENANCE/FUEL VEHICLES AND PERSONNEL - Maintenance/fuel vehicles will be assigned and manned as needed to provide an adequate supply of fuel to maintain equipment operations. Maintenance/fuel vehicles will be assigned and manned as needed to provide all required field maintenance to ensure equipment operations. SAFETY - All supervisors and/or foremen will utilize the check sheet provided by the Company Safety Officer to ensure all safety equipment is maintained and operable on all debris disposal hauling equipment and to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. OPERA TIONS - All field supervisors shall ensure that all debris disposal-hauling operators are licensed and/or certified to operate required equipment. All debris disposal operators will be given area maps designating assignment/authorized areas of operations as well as transport routes designated and/or approved by the Government. All debris disposal haul operators shall visibly display colored signs provided by the Company and, if applicable, the Government. The Company signs are magnetic signs to be placed on the driver and passenger doors of the vehicle cab. Any signs provided by the government will be displayed on both sides of the forward most section of the vehicle bed, unless otherwise directed by the government task order. All signs will be removed from the exterior of the vehicle, at close of business each day and secured by the driver to prevent theft or loss. Signs will be replaced on the vehicle at the beginning of the workday. Colored paper signs/passes will be displayed in the driver's side windshield of each vehicle. The color of the sign/pass is subject to change, without notice, to ensure quality control measures regarding authority to exit work sites and enter disposal site(s). All debris disposal haul operators shall maintain the numbered debris hauling/transportation documentation/ verification form ORC-DM-12. Each form contains directions, which should be followed. All supervisors will be responsible to ensure that all employees utilizing and/or inputting infonnation on the form are procedurally trained. It will be each supervisor's responsibility to maintain a supply of the required number of fonns. Forms will be distributed by supervisors/foremen to debris disposal haul operators during loading operations and after completing Section 1 of form DRC-OM-12. All debris disposal operators will maintain daily ticketlhaul records to be turned into field supervisors, with copies ofload tickets at close of business each day. DEBRIS STAGING SITE RESTORATION Restoration is conducted during the closing of each TOSR site. The scope of remediation is determined during operation and closure, by terms of the land lease (if any), or government directive or task order. Remediation consists of final removal of all debris (including residual debris), removal and remediation of HTW, abatement of any safety and/or environmental concerns (to include environmental testing and/or monitoring, if required), the removal of temporary structures (including any inspection towers), grading and leveling, removal of roads and fencing, if appropriate, and potentially grassing or seeding of the site, if required, to f' documented pre-use condition. .., 38 Q Remediation of Debris Staging Sites is the process of returning the site to pre-use, and in some cases, pre-event condition. Debris Staging Site Restoration is perforn1ed in four primary phases. . Pre-use inspection and documentation . Operational Environmental Protection . Closure Procedures . Final inspection, release, and acceptance of Government and/or Landowner Each Debris Staging Site will require inspection prior to use, for the following: . Existing topography . Existing vegetation (grass, shrubs, trees) . On-site or near-site water sources . Existing structure and their current condition . Any 'other distinguishing characteristics such as hazardous and/or non-hazardous materials stored on site When required, a basic Environmental Impact Statement, III accordance with the company's Environmental Protection Plan shall be accomplished. o Documentation - A narrative description shall be prepared for each site. Sketches and/or drawings (basic) shall be produced to illustrate the current condition of the site and its contents, as well as content location. Still photographs or video will be taken of each site, both ground level and aerial, to additionally illustrate the pre-use condition of the site and its contents. Environmental Sampling to include: . Random soil samples, surface and sub-surface, my be taken and sealed in containers for comparison with post-use samples taken at the time of site closure when possible contamination is evident. . Prior to sealing these samples, a small portion of each sample will be field tested to determine the presence of contaminants prior to use of the site. . On-site and off-site samples will be taken of any impactable water source. . Water source samples will be stored and tested using the criteria stated above. . Samples of both water and soil will be taken in accordance with the above standards after operations have ended (post use samples). . Post use samples and pre-use samples will be tested in the Corporate Laboratory and/or another Certified Laboratory to determine the presence of contaminants. o Should contaminants be identified in the pre-use field test, a determination of whether or not a particular site or area of a site should be utilized will need to be made by ORC Senior Management and the client representative. Should contaminants be identified in post use test results that were not present in pre-use test results, remediation of the site or area of the site will be accomplished in accordance with Federal, State and local regulations as well as current industry standards. 39 c o ~ OPERA TIONAL ENVIRONMENTAL PROTECTION - All work performed at and/or in relation to a debris-staging site will be performed in a skilled and workman-like manner. All debris staging site operations shall be conducted in accordance with the Company's Environmental Protection Plan and to ensure compliance with the Corporate Accident Prevention Plan as part of the Corporate Safety Plan. CLOSURE PROCEDURES - Pre-use inspection and documentation infonnation shall be utilized as a guide to restore each site to pre-use condition. REMOVAL OF DEBRIS - Debris residue, not taken to the appropriate disposal site during debris disposal operations, shall be collected, recorded and hauled to the appropriate disposal site. ORC or a licensed hazardous waste remediation company shall be retained to accomplish the removal of all hazardous and/or toxic waste from each site, if not already accomplished under separate agreement by the Government. REMOVAL OF TEMPORARY STRUCTURES - All temporary structures such as fencing, inspection towers, temporary offices, sanitary facilities, etc., shall be removed from each site. LANDSCAPE OPERATIONS - Each site shall be graded, as required to return the topography to pre-use elevations, unless otherwise directed by Government task order. Each site will be vegetatively restored to pre-use condition by seeding, fertilizing and laying of straw as well as replacement of agreed-upon shrubs and/or trees. CLOSURE DOCUMENT A TION - The procedures described in Section F3 of this plan shall be followed for closure documentation. FINAL INSPECTION, RELEASED AND ACCEPTANCE OF GOVERNMENT AND/OR LANDOWNER - ORe' Senior Management, the Supervisor responsible for a particular site, the Governments Representative and if applicable, the landowner shall constitute an inspection team. The Company Supervisor responsible for the applicable site shall have, for examination by all Inspection Team members, the documentation package to include pre-use and closure inspection documentation as well as all chronological documentation created during the operational period. After all inspection team members accept the post-closure condition of each site, a release and hold-harmless for the Company shall be signed by the Government and/or landowner, releasing ORC of any further responsibility and liability. 40 o 3. TRACKING. REPORTING AND REIMBURSEMENT FEMA Reimbursement Filing o Storm debris management by DRC is subject to inspection by the governmental contracting entity and/or any Public Authority in accordance with generally accepted standards, to insure compliance with the contract and applicable local, state and Federal laws. ORC will, at all times, provide the government access to all work sites and disposal areas and will cooperate completely with Government Inspectors. In addition, authorized representatives and agents of any participating Federal or state agency are encouraged to inspect all work and materials. ORC and the government shall have in place at the TOSRS, personnel to verify the contents and cubic yards of all vehicles entering the TOSRS. Records are maintained of each load entering the TOSRS, its cubic yardage is verified, and each vehicle leaving the TOSRS is typically viewed to verify it was in fact empty. ORC and the government monitor the material to detennine that it in fact consists of eligible storm debris. ORC and the government nonnally have in place at the pick up site, personnel to verify the contents, location, date and time of the vehicles departing for the TOSRS and to issue the load ticket for that load which is to ensure the eligibility of the debris. Prior to use, ORC recommends that the government, including FEMA, if possible, establish and record the certified cubic yard capacity and perform a safety inspection of each haul vehicle. DRC recommends that all measurements be conducted by government personnel or independent third parties, and not DRC or the subcontractor. ORC has in the past provided disposal tickets, field inspection reports, and other data and/or forms sufficient to provide substantiation for Federal (FEMA, etc.) and State reimbursement to its government clients. ORC personnel and subcontractors have worked closely with various State Emergency Management Agencies, the Federal Emergency Management Agency and other applicable State, local and Federal Agencies to insure that eligible debris collection and the data documenting is sufficient and appropriately addressed. Data Management and Tracking ORC ES tracks costs on a real time basis using a Daily Progress Report that is completed and submitted daily to the on-site project manager. Additional information can be added to meet any local unique needs for capturing the data. Hours and/or cubic yards are summarized at the bottom of the report and a daily cost is determined. This information is reconciled daily with the government. Recordkeeping & Reporting ORC ES shall submit daily progress and quality control reports to the governing entity for all activities. Each report would contain, at a minimum, the following information: o 1) Letterhead with DRC name and contact information 2) Report Date 3) Location of completed work 4) Location of work for next day 41 o o 5) Daily and cumulative hours for each piece of equipment and crew (Emergency Clearance) 6) List of roads that were cleared (Emergency Clearance) 7) Number of Crews (including number of trucks and loading equipment) 8) Daily and cumulative totals of debris removed, by category 9) Daily and cumulative totals of debris processed, to include methodes) of processing and disposallocation(s) 10) Daily estimate of hazardous waste debris segregated, and cumulative amount of hazardous waste placed in the designated holding area 11) Number of hazardous trees and hanging limbs removed. 12) Problems encountered or anticipated Typically, Daily Reports are co-signed by the governing entity's inspector to verify work performed. In addition, the governing entity receives an original copy of all load tickets and receives and verifies for co-signature, a Daily Reconciliation Sheet listing each load ticket, the truck number, crew number, street, truck volume, percent full, credited volume of debris removed and the total volume removed for the day. This Daily Reconciliation Sheet is typically verified by the governing entity and becomes the invoicing document for the Contract. Preparing and Submitting Federal/State Project Work Sheets ORC ES can assist the Government entity in completing any and all fonns necessary for reimbursements from state or federal agencies relating to eligible costs arising out of the disaster recovery effort. This may include, but is not limited to, the timely completion and submittal of reimbursement requests, preparation, and submittal of any and all necessary cost substantiations and preparing replies to any and all agency requests, inquiries or potential obligations, denials or de-obligations. Knowledge of CFR 44 Since it's inception in 1989, DRC's senior management personnel have gained a vast knowledge of the basic policies and procedures of the Code of Federal Regulations (CFR 44) as it relates to Federal Emergency Management Agency's mission. These policies and procedures have been incorporated into ORC and ORC ES's various corporate Debris Management plans and guides to ensure compliance with the latest FEMA guidelines. FEMA Technical Management Training ORC and/or ORC ES have on staff, or available through its extensive Reservist/Consultant Personnel Database, qualified personnel who are available to assist any client with Exercises, Plans Fonnulation, or Training of Government personnel on eligibility issues, reimbursement procedures, documentation, etc. ORC will provide regular annual or more frequent training and feedback sessions to the government as a service at no additional cost to the County. Training sessions are scheduled and led by director of training Jennifer Peacock and will address planning """' and reimbursement issues as well as any other concerns of the County. Typically, training .. 42 C) o o sessions also include ORC consultant and reservist personnel who are former FEMA personnel or who are intimately familiar with FEMA and other government regulations. DRC Data Center ORC maintains a fully-staffed, fully operational Data Center at its headquarters year round. The Data Center is staffed by experienced and professional personnel with extensive knowledge of recording, reporting, contract, and reimbursement requirements. The Data Center is equipped with state-of-the-art infonnation technology and is prepared to meet and exceed the reporting requirements of the government. 43 c o CI - 4. GEOGRAPHIC AREA MANAGEMENT SYSTEM DRC will maintain current geographic and cartographic for all awarded and reach back regions. Upon Task Order Notice to Proceed, Operations Management will utilize these resources to develop a Geographic Area Management Plan to strategically and systematically accomplish debris collection from the affected area. Depending on the size and nature of the event, affected regions will first be divided between urban, semi- or suburban, and rural areas. Within each of these sector types, the affected area will further be subdivided according to geographic boundaries of major political subdivisions, e.g., counties, cities, towns, etc. Typical breakdown is as follows: 1. Urban Sector - high density population producing .large amounts of debris and narrow streets with limited accessORC will mobilize its smaller more versatile crews to work within this environment. The crews will be made up of 20 to 30 cubic yard hauling vehicles with small- medium size loaders such as bob cats, self loaders and tele-handlers. Crew labor will be consistent with company operational plan and GOVERNMENT typical crew specifications. 2. Semi-Urban Sector-medium density population and debris loads with minor access limitations. ORC will mobilize its typical work force crews that are made up of combination crews such as 50 to 100 CY Self-loading knuckle booms, medium to large loaders and medium to large hauling vehicles. Crew labor will be consistant with company operational plan and GOVERNMENT typical crew specifications. 3. Rural Sector- low population density and debris loads with full access for all types of equipment. DRC will mobilize a similar work force that is consistent with the above semi-urban sector. City and county maps will be divided and identified according to districts, sections, developments, directional quartile partitions, or address blocks. Each individual sector will be printed for assignment to a specific crew, as well as for the records of the field supervision for that overall subdivision. Sector Managers/Field supervision will maintain assignment maps in a binder at area project management location. Finally, a master assignment file will be maintained with the Operations Manager at the Mobile Command Center or other central project management location. Crews will be dispatched by sector management/field supervisors or project managers each day to specifically target sectors in order meet production rates and to provide an even rate of clearance for the affected area during each pass/phase. No crew or subcontract crew will be permitted to have more than two open sectors at any given time. Upon completion of an assigned sector, crew chiefs will request an inspection by field supervision and/or project management. ORC Project Management will coordinate an inspection with the GOVERNMENT before closing a sector assignment. Any rework assignments must be complete before the issuance of an assignment for another sector. 44 o o w ORC dispatchers are responsible for monitoring and recording of the number, type, and location of all crews in an assigned area. Following each work period, the dispatcher will report crew location, numbers, and types to field and project management. Crews and subcontract crews will be prohibited from collecting debris from other than assigned sectors. GPS, AOMS, and/or othe location reports will be required of all loads. GOVERNMENT will be provided with sector and crew assignment and management plans daily. Haul destinations and distances for loads for each sector in most cases will be predetem1ined by sector location cross referenced with available debris staging or disposal locations. Haul distance category will be assigned in advance in most cases (e.g., 0-15 mi., 15-30 mi., etc.) and confirmed using GPS and/or AOMS data and/or by an inspector. 45 o o g 5. SAFETY PLAN PROJECT MANAGEMENT TEAM AND ADMISTRA TIVE RESPONSIBILITIES The DRC Safety Officer for the affected area is the official responsible for health and safety issues. His authority and responsibility include the development, enactment, and enforcement of organization's overall Health and Safety Program. An outline of his responsibilities includes" Professional Development . Establish and maintain a health and safety library . Keep appraised of changes in health and safety regulations . Participate in professional organizations related Program Development . Develop and maintain the injury and illness prevention program . Develop and maintain the injury and illness prevention policies and procedures Safety rules Incentive and motivation programs Accident investigations Safety inspections Plan and prepare for natural and manmade disasters Establish a medical program, which includes on-site First Aid capabilities And off-site emergency car Training and Communication . Provide a general safety orientation for employees . Train supervisors and managers in their responsibilities . Inspection of facilities, work sites, material, equipment Enforcement . Assure safe job placement and assignment . Conduct hazard analysis of existing facilities and operations . Study hazards of planned and proposed operations . Accident investigation . Audit safety performance . Conduct research on technical safety problems Accounting . Maintain the accident record keeping system . Maintain documentation on all aspects of the injury and illness prevention program SAFETY TRAINING AND CONTINUING SAFETY EDUCATION lt is the policy of this organization to provide and maintain work environments and procedures which wille 1) safeguard public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities; (2) avoid interruptions of Government operations and delays in project completion dates; and (3) control costs in the perfonnance of this contract. The key contractor responsibilities concerning safety include (1) providing all personnel a general safety and health indoctrination and a safety and health orientation/screening 46 o C) c prior to the commencement of work (or any single phase of work); (2) the continuing instruction/monitoring of each contractor, subcontractor, supplier and employee in the safe operation of their specific area of responsibility using the proper tools and in accordance with the safety procedures and guidelines outlines in United States Army Corps of Engineers Manual EM 385-1-1 revised October 1998 to insure that all work is performed in a safe manner. Through careful planning, hazard recognition and control, safety indoctrination and training, and rigorous attention to safety procedures, we shall ensure the health and safety or personnel at our work sites and the public adjacent to our work sites. No person shall be required or instructed to work in surroundings or under conditions that are unsafe or dangerous to his/her health. Any person aware of an unsafe or dangerous condition shall report the condition to his/her supervisor immediately. The particular operation will be stopped; the project manager will appoint a competent individual to investigate the condition and make corrections prior to restart of the operation. All information shall be recorded, maintained in the project file. A copy of the manual is available upon request. Safety and health meetings shall be conducted once a month for all supervisors on the project location and once a week by supervisors (foreman) for all workers. The meetings shall be documented by the Safety Officer. The minimum information included in the report shall be (1) the date of the meetings; (2) name, social security number, and signature of attending individual(s); (3) the name of the individual(s) conducting the meeting. Copies of the safety manifest will be kept on file for a period of one year and shall be furnished to the designated authority upon written request. The safety and health indoctrination and training meetings shall be based upon the contractor Safety Program and the United States Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1, October 1998. Safety and health subjects, at a minimum, shall include: . Requirements and responsibilities for accident prevention and maintaining safe and healthful work environments . General safety and health policy and procedures and pertinent provisions of EM 385-1-1 . Employee and supervisor responsibilities for reporting all accidents . Provisions for medical facilities and emergency response and procedures for obtaining medical treatment or emergency assistance . Procedures for reporting a correcting unsafe conditions or practices . Job hazards and the means to control/eliminate those hazards, including applicable job and/or activity hazard analyses . Job hazards communication HEALTH AND SAFETY PROVISION Accident Reporting All supervisory personnel, foreman and employees will be instructed to report accidents to the Project Manager. Employees are responsible for reporting all injuries or occupational-related illnesses as soon as possible to his/her immediate supervisor. The contractor's office will record all incidents, along with the treatment provided. Reports will contain the following information: . Name 47 c o e . Date of Injury . Time of Injury . Nature of Injury or Illness . Description of Accident . Treatment Provided . Date of Admittance (If Applicable) . Occupation . Name of Witness (If Applicable) . Name of Employer . Name of Immediate Supervisor An accident that results in earth a fatal injury, five or more persons admitted to a hospital or property damage in an amount that exceeds $2,000.00 shall be reported to the designated authority and to the contracting office within twenty-four hours. Except for rescue and emergency measures, the accident scene shall not be disturbed until it has been released by the investigating official. A contractor representative will be assigned to investigate accidents of this nature in depth to identify all causes and to recommend hazard control measures. Safety Summary - Accident Reporting Each employee shall be provided initial indoctrination and such continued safety training to enable him or her to perform their responsibilities safely. Injured persons fare responsible for reporting as soon as possible to their immediate supervisor or foreman. A first report of injury will be recorded on all injuries with a copy maintained by the contractor. All persons treated and released must have a doctor's statement as to the employee's condition concerning their work status. A copy will be maintained by the contractor on the project while the original will be forwarded to main office. A daily record of all first aid treatments not otherwise reportable shall be maintained on prescribed fonns and furnished to the designated authority upon request. All accidents will be documented, investigated, and recommendations will be implemented to prevent a further occurrence. Sanitation An adequate temporary supply of Federal, State, or local health authority approved drinking water will be supplied in all places of employment. Only approved potable water systems shall be used for the distribution of drinking water. Portable drinking water systems will be used and shall be designed, constructed and serviced to ensure sanitary conditions, shall be capable of being closed, and shall have a tap. Containers shall be clearly marked as to their contents and shall not be used for other purposes. Water shall not be dipped from containers. Use of a common cup is prohibited. Unused disposable cups shall be kept in sanitary containers and waste receptacle shall be provided for used cups. Drinking water shall be dispensed by means that prevent contamination between the consumer and source 48 o Outlets dispensing non-potable water will be conspicuously posted Caution -water Unfit for Drinking, Washing, or Cooking. There shall not be any cross connection between a system furnishing potable water and a system furnishing non-potable water. Toilets Where sanitary sewers are not available, chemical toilets will be provided in compliance with local codes. Two chemical toilets will be provided, one for each sex. Each toilet shall be equipped with a toilet seat and toilet seat cover. The facility designated for male use will be equipped with a metal or plastic urinal trough. The facilities shall be constructed so that the occupants shall be protected against weather and falling objects; all cracks shall be sealed and the door shall be tight-fitting, self-closing and latchable. Adequate ventilation shall be provided and all window and vents screened; seat boxes will be vented to the outside (minimum vent size 4" diameter) with vent intake located one inch below the seat. The interior of the facility shall be lighted. Provisions for routinely servicing and cleaning all toilets and disposing of the sewage shall be established before placing toilet facilities into operation. The method of sewage disposal and location selected shall be in accordance with Federal, State, and local health regulations o Waste Disposal Receptacles used for putrescible or dangerous waste material shall be so constructed to prevent leakage and to allow thorough cleaning and sanitary maintenance. The receptacles will be maintained in a sanitary condition without the aid of a cover. The solid and liquid waste will be removed of in a manner as to avoid creating a menace to health and often as necessary to maintain a sanitary environment. Housekeeping Working areas will be cleaned up daily. The contractor will provide all personnel and equipment to ensure compliance with all housekeeping requirements. The contractor will inspect the work area daily and record all findings on a daily inspection report to ensure the facility is in compliance. In the location of temporary buildings and yard storage, appropriate care shall be taken for proper separation to preclude an accumulation of fire potential. The contractor is responsible for maintaining the entire area, but particularly storage areas, free from accumulation of unnecessary combustible materials Medical and First Aid Requirements Prior to start of work, arrangements shall be made for medical facilities and personnel to provide prompt attention to the injured and for consultation on occupational safety and health matters. Communication and transportation to effectively care for injured workers shall be provided. Employees on each shift shall be instructed to administer First Aid and CPR. No employees shall be required to work alone in remote areas. First Aid kits shall contain at minimum sixteen unit-type first aid packages. First Aid kits comply with 2308.1 constructed or weather proof containers, easily accessible to all workers, and each item therein maintained sterile. () The contents of First Aid kits shall be checked prior to utilization and weekly when work is progress to insure that expended items are replaced. 49 o o o Temporary Facilities Plans for the layout of a temporary construction building (field office trailer or mobile command center), fencing, access routes and anchoring systems for the temporary construction building shall be submitted to and approved by the designated government authority. The temporary field office design and construction shall have the following taken in to consideration: . Dead and live loads . Soil and hydrostatic pressures . Wind loads . Rain and snow loads The field office shall be anchored with rods and cables or by steel straps to ground anchors. The anchor system shall be designed to withstand winds and must meet applicable state or local standards for anchoring mobile trailer homes. Temporary project fencing (or a substitute acceptable to the government's designated authority and delineated in the accident prevention plan) shall be provided in areas of active utilization by members of the public. Signs warning of the presence of construction areas shall be posted on the fencing. At a minimum, posting shall be on all fenced sides of the project and spaced on sign every three hundred feet. The contractor shall control access to the construction area. The construction are shall be designated a hard hat area and signage designating it as such shall be posted at any and all points of entry. Official visitors shall wear the required Personal Protective Apparel. Personal Protective and Safety Equipment Employees shall use any personal protective and safety equipment (PPSE) which may be required to maintain their exposure within acceptable limits. The contractor shall ensure that employees receive training in and use and maintain their exposure within acceptable limits. At a minimum demolition phase personnel shall be required to wear clothing suitable for the weather and conditions including long sleeve shirts, long trousers, protective work boots, and head protection. As/if hazards warrant, hearing protection, eye protection, hand protection, and respiratory protection shall be required. Persons handling rough, sharp edged, abrasive materials or here the work subjects the hands to lacerations, punctures, bums, or bruises shall use hand protection. All PPSE shall properly fit the employee. Eye protection equipment shall meet the requirements of ANSI standard Z87-1. Head protection shall meet the requirements of ANSI Z89.1. Employees shall be physically able and medically determined qualified to use the personal protective and safety equipment, which may be required in their job duties. Users of PPSE shall be trained in and knowledgeable of the use, limitations, inspection, and maintained in serviceable and sanitary condition as recommended by the manufacturer. All PPSE shall be inspected regularly and maintained in serviceable and sanitary condition. Defective equipment shall not be used. Before being stored or reissued to another person equipment shall be cleaned, disinfected and repaired. Chainsaw operators shall be required to wear approved leg (chaps) and foot protection in addition to the mandatory PPSE. Fire Prevention All provisions of the National Fire Prevention Code, the United States Coast Guard Regulations, and any applicable local requirements will be adhered to. 50 G G ~ The contractor shall survey all activities and determine which require a hot work pern1it. Fires and open flames shall not be left unattended. All sources of ignition shall be prohibited within fifty feet of operations with a potential fire hazard: the area will be conspicuously and legibly posted No Smoking or Open Flame. Smoking shall be prohibited in all areas where flammable, combustible materials are stored: No Smoking or Open Flame signs will be posted in all prohibited areas. Approved fire extinguishers will be placed in each piece of operating equipment following the guidelines set forth in EM 385-1-1. Fire extinguishers shall be approved by a nationally recognized testing laboratory and labeled to identify the listing and labeling organization and the fire test and performance standard that the fire extinguisher meets or exceeds. Machinery will be equipped with a C02 or dry chemical fire extinguisher with a minimum UL rating of 5-B:C. General training will be provided by the project supervisor on the use and locations of fire extinguishers. Facility fire extinguishers will be suitably placed, distinctly marked, readily accessible, and maintained in a fully charged and operable condition. A fire extinguisher, rated not less than 20B shall be located not less than twenty-five feet or more than seventy-five feet from any outside flammable liquid storage area. Flammable liquids shall be kept in closed containers when not in use. Safety cans and other portable containers for flammable liquids have a flash point at or below seventy-three degrees Fahrenheit shall be painted red with a yellow band around the can and the name of the contents legible indicated on the container. Flammable and combustible liquids shall not be stored in areas used for exits, stairways, or safe passage of people. Workers shall carefully guard against any part of their clothing becoming contaminated with flammable or combustible fluids. They will not be allowed to continue to work if their clothing becomes contaminated and must remove or wet down the clothing as soon as possible. No flammable liquid with a flash point below one hundred degrees Fahrenheit shall be used for cleaning purposes or to start or rekindle fires. Areas in which flammable or combustible liquids are transferred in quantities greater than five gallons shall be separated from other operations by at least twenty-five feet or a barrier having a fire resistance of at least one hour. Drainage or other means shall be provided to control spills. During refueling natural ventilation shall be provided to maintain the concentration of flammable vapor at or below 10% of the lower flammable limit. All storage, handling, and use of flammable and combustible liquids shall be under the supervision of a qualified person. Only approved containers and portable tanks may be used for storage and handling of flammable and combustible liquids. Approved metal safety cans shall be used for handling and use of flammable liquids in quantities greater than one gallon with certain specific exceptions. Flammable or combustible liquids will not be stored in areas used for exits, stairways, or norn1ally used for the safe passage of people. The indoor storage of flammable and combustible liquids will be limited to no more than fifteen gallons. Disposal of combustible waster materials shall be in compliance with environmental laws and regulations. Vehicles, equipment, materials, and supplies shall not be places so that access to fire hydrants and other fire fighting equipment is obstructed. During demolition, existing automatic sprinkler systems (if applicable) shall be retained in service as long as reasonable. Modification of sprinkler systems to pennit alterations to additional demolition should be expedited so that they system may be returned to service as quickly as possible. Sprinkler control valves shall be checked daily at close of work to ascertain 51 o that the protection is in service. The operation of sprinkler control valves is pennitted only when approved by the designated authority. Machinery and Mechanized Equipment Before any machinery or mechanized equipment is placed in use, it shall be inspected and tested by a competent person and certified to be in safe operating condition. Inspections and tests shall be in accordance with manufacturers' recommendations and shall be documented. Records of tests and inspections shall be maintained at the site by the contractor, and shall be made available upon request of the designated authority, and shall become part of the project file. All machinery and equipment shall be inspected daily to ensure safe operating conditions: certified persons will conduct the daily inspections and tests. Tests shall be made at the beginning of each shift during which the equipment is found to be unsafe, or whenever a deficiency which affects the safe operation of equipment is observed, the equipment shall be immediately taken out of service and its use prohibited until unsafe conditions have been corrected. A tag indicating that the equipment shall not be operated and that the tab shall not be removed, shall be placed on the steering wheel. . Where required, lockout procedures will be used. The tag will remain in its attached location until it is demonstrated to the individual deadlining the equipment that it is safe to operate. When corrections are complete, the machinery or equipment shall be re-tested and re-inspected prior to being returned to service. G Machinery and mechanized equipment shall be operated only by designated, qualified personnel. Machinery or equipment shall not be operated in a manner that will endanger persons or property, nor shall the safe operating speeds or loads be exceeded. Getting off of any equipment while it is in motion is prohibited. Machinery and equipment shall be operated in accordance with the manufacturers' instructions and recommendations. When the manufacturers' instructions or recommendations are more stringent than the requirements of this manual, the manufacturers' instructions or recommendations shall apply. Seat belts or equal protection will be provided on each piece of machinery and equipment. Seat belts and anchors meeting the requirements of 49 CFR 571 shall be installed and worn in all motor vehicles. Glass used in windshields or cable shall be safety glass. Equipment operated on the highway shall be equipped with headlights, taillights, brake lights, and back-up lights and turns signals from the front and rear. All equipment with windshields shall be equipped with power wipers. Vehicles the operate under conditions that cause fogging or frosting of the windshields shall be equipped with operable de-fogging or de-frosting devices. Mobile equipment, operating within an off-highway job site not open to public traffic, shall have a service brake system and parking brake system capable of stopping and holding the equipment while fully loaded on the grade of operation. Heavy-duty hauling equipment shall have an emergency brake system, which will automatically stop the equipment upon failure of the service brake system. The emergency brake system shall be manually operated from the cab of the equipment. G Preventative maintenance procedures recommend by the manufacturer shall be followed. All machinery or equipment shall be shut down and positive means taken to prevent its operation while repairs or manual lubrications are being done. For all repairs on machinery or equipment or parts thereof which are suspended or held apart, slings, hoists, or jacks shall also be 52 o substantially blocked or cribbed before personnel are permitted to work underneath or between them. End-loader buckets shall be fully lowered or blocked when not in use. All controls shall be in neutral positions with the engines stopped and brakes set, unless work being performed on the machinery requires otherwise. Stationary machinery and equipment shall be placed on a firm foundation and secured before being operated. All work areas in which heavy machinery is being operated shall be illuminated. All vehicles which will be parked or moving slower than normal traffic on haul roads shall have a yellow flashing light or four-way flashers from all directions. Equipment shall be shut down prior to and during fueling operations. Whenever equipment is parked, the parking brake shall be set. Equipment parked on an incline shall have the wheels chocked or track mechanism blocked and the parking set. All equipment left unattended at night, adjacent to a highway in normal use or adjacent to construction areas where work is in progress, shall have lights or reflectors, or barricades equipped with lights or reflectors, to identify the location of the equipment. No modifications or additions which affect the capacity or safe operation of the machinery or equipment shall be made without the manufacturers' written approval. If such modifications are made, the capacity, operation, and maintenance instruction plates, tags, or decals shall be changed accordingly. In no case shall the original safety factor of the equipment be reduced. Steering or spinner knobs shall not be attached to the steering wheel. All industrial trucks shall meet the requirements of design, construction, stability, inspection, testing, maintenance, and operation, defined in ANSI/ASME B56.1 Safety Standards for Low Lift and High Lift Trucks. C The controls of loaders, excavators, or similar equipment with folding booms or lift arms shall not be operated from a ground position unless so designed. Personnel shall not work or pass under or ride in the buckets or booms or loaders in operation. All machinery and construction equipment will be equipped with a reverse signal alarm. Reverse signal alanns shall be audible and sufficiently distinct to be heard under prevailing conditions. Reverse signal alarms shall in addition to requirements for signal persons. All belts, gears, shafts, pulleys, sprockets, spindles, drums, flywheels, chains, or other reciprocating, rotating, or moving parts of equipment shall be guarded when exposed to contact by persons or when they otherwise create a hazard. All hot surfaces of equipment, including exhausts pipes or other lines, shall be guarded or insulated to prevent injury and fire. Substantial overhead protection shall be provided for operators of construction equipment in the form of FOPs and lor Raps. () Motor Vehicles Every person operating a motor vehicle shall possess, at all times while operating such a vehicle, a permit valid for the equipment being operated. No vehicle shall be placed in service until it has been inspected on a scheduled maintenance program. Weekly inspections include the following. . Service brakes, including trailer brake connections . Parking System . Emergency Stopping System . Tires 53 10 I o Q . Horns- Backup alarms . Steering Mechanisms . Coupling devices . Seat Belts . Operating controls . Safety devices . Accessories including lights, reflectors, windshield wipers, defrosters, and fire extinguishers. Records of tests and safety inspections shall be maintained at the site and shall be available on request to the designated authority. Vehicles not meeting safe operating conditions shall be immediately removed from service, its use prohibited until unsafe conditions have been corrected, and re-inspected before being placed in service again. Equipment operated between sunset and sunrise shall have the following lights: . Two headlights . At least one red taillight and one red or amber stoplight on each side of the rear. . ~irectional signal lights on both front and back. . Three emergency flares, reflective markers, or equivalent portable warning device. All vehicles shall be equipped with service brakes and manually operated parking brakes. Service and parking brakes shall be adequate to control the movement of, to stop, and to hold the vehicle under all conditions of service. Service brakes on trailers and semi-trailers shall be controlled from the driver's seat of the prime mover. Braking systems on every combination of vehicles shall be so designed as to be in approximate synchronization on all wheels and develop the required braking effort on the rear wheels first. The design shall also provide for application of the brakes by the driver of the prime mover from the cab. Exceptions to this are vehicles in tow by approved tow-bar hitch. Every motor vehicle shall have: . Speedometer . Fuel gauge . Audible warning device in operation condition . Windshield and windshield wiper . Operable defrosting and defogging device . Adequate rearview mirror . Cabs, cab shields, and other protection . Non-slip surfaces on steps . Power operated starting device Glass in windshields, windows, and doors shall be safety glass. Any cracked or broken glass shall be replaced. Industrial and commercial vehicles shall meet the guarding and safety requirements of EM 385- 1-1 Section 16.B. 54 o o c All dump trucks shall be equipped with a holding device to prevent accidental lowering of the body while maintenance work or inspection work is being done. All hoist levers shall be secured to prevent accidental starting or tripping off of the mechanism. All off-highway end-dump trucks shall be equipped with a means to determine whether or not the dump box is lowered. Minimum emergency equipment required is one red flag not less than 12 inches square with standard and three reflective marks, which shall be available for immediate use in case of emergency stops, two wheel clocks for each vehicle or each unit of a combination of vehicles, at least one 2A: 1 OB:C fire extinguisher. The principles of defensive driving shall be practices. Seat belts shall be installed and worn per 16.B.08. The operator must have the vehicle under such control as to be able to bring it to a complete stop within the assured clear distances ahead. Vehicles will not be driven at speeds greater than the posted speed limits, with regard for weather, traffic, intersections, width, and character of the roadway, type of motor vehicle, and other existing conditions. Headlights shall be lighted from sunset to sunrise, during fog, smoke, rain, or other unfavorable atmospheric conditions, and at any other time when there is not sufficient light for the vehicle to be seen or for the operator to see on the highway at a distance of five hundred feet. Vehicles shall not be driven on a downgrade with gears in neutral or clutch disengaged. Drivers of trucks and similar vehicles shall leave the cab while the vehicle is being loaded, when they are exposed to danger from suspended loads or overhead loading equipment. Vehicles shall not be loaded in a manner which obscures the driver's view ahead or to either side or which interferes with the safe operation of the vehicle. The load on every vehicle shall be evenly distributed and tarped (the tarp equipment may be waived only by the Corporate Safety Officer with approval from the Contracting Officer's Representative). All trucks shall be equipped with the manufacturers' approved tailgates. These gates shall be the "barn-style" gates in lieu of the swinging tailgate that is hinged at the top of the dump body. If vehicles have the swinging tailgate, they may substitute tailgate fencing for the manufacturers' gate. Contractor will not approve fencing that does not have solid metal bars around all four sides of the fence. The following criteria apply to tailgate fencing: . Attach fencing permanently to one side of truck bed · After loading, secure fencing to the other side of the bed in two places with heavy-gauge WIre. . Fencing must extend to the bottom of the bed. · Solid metal bars shall be used on all four sides on the fence. This will allow the load to be secured without having to tie the bottom of the fence to the bed. Debris Reduction Sites The contractor shall submit a debris reduction plan prepared by a component person based on the engineering for the safe reduction of all debris. Household hazardous materials, to the extent practical shall be removed and disposed of prior to arriving at the debris reduction site. Household hazardous material will be removed by the collection crews and left at a curbside prior to arrival at the dumpsite. Spotters will be employed at the dumpsite to further inspect loads for household hazardous materials. This material will be sorted out and stored in the Field Expedient HTW Containment Cell. Each dumpsite will have a HTW Containment Cell. Dust 55 o I i I ;0 I ~ control shall be performed as the work proceeds and whenever a dust nuisance or hazard is identified. Only those persons necessary for the operations shall be permitted in the debris reduction work area at any time. A 300-foot exclusion zone will be established around all tub grinding equipment. An example site plan is attached. Employees engaged in debris reduction activities shall be instructed in the plan so that they may conduct their activities in a safe manner. Debris Collection Each location where debris collection is done shall be under the direction of a qualified supervisor. Electrical equipment or conductors in the vicinity shall be considered energized. Debris collection equipment shall be inspected, maintained, repaired, and used in accordance with the manufacturers' instructions. All vehicles shall have completed Safety Checklist for Vehicles, completed prior to commencing work. Employees shall be instructed in the safe and proper use of all equipment provided to them. Prior to felling operations, the employee shall consider: . Trees and the surrounding area for anything that may cause trouble when the trees are loaded. . Shape of the tree, the lean of the tree, and decayed or weak spots . Wind force . Location of people . Electrical hazards . Traffic control devices/ personnel The work area shall be cleared to ensure safe working conditions. Brush and logs shall not be allowed to create a hazard at the work site. Logs and brush shall be securely loaded onto trucks in such a manner as not to obscure tailor brake lights and vision, or to overhang the side. EMERGENCY RESPONSE CAPABILITY AND CONTINGENCY PLANS Emergency response will be covered at the safety and health indoctrination and continuing training meeting. The plans shall be randomly tested to ensure their effectiveness. Inclusive of these plans and procedures shall be: . Escape procedures and routes . Critical plant operations · Employee accounting following an emergency evacuation . Rescue and medical duties . Means of reporting emergencies . Persons to be contacted for infom1ation or clarification Planning for this operation shall include the total system response capabilities to minimize the consequences of accidents or natural disaster. On-site emergency planning shall be integrated with off-site emergency support. Emergency alert systems shall be developed and tested to alert all persons likely to be affected by existing or imminent disaster conditions and to alert and summon the people and equipment compromising the emergency response capability. 56 o o ,.....,. ~ Emergency telephone numbers and reporting instructions for ambulance, physician, hospital, fire, and police shall be conspicuously posted at the work site. In the unlikely even of an emergency response situation, the following procedures will be implemented: . Project Manager will be immediately notified . Project Manager will evaluate the emergency and notify the following agencIes, if necessary. o Client Representatives o Local fire and Police Departments o Local environmental officials o Local emergency management personnel o Residents adjacent to site When necessary, all personnel will be evacuated from the site and issued additional safety equipment as required. A signal for site evacuation will be established at the onset of site activity. FIRE. FIRST AID EMERGENCY AND AMBULANCE SERVICE 911 (APPROPRIATE LOCA nON) Fire and Rescue Department PREVENTION OF ALCOHOL AND DRUG ABUSE ON THE JOB At no time while on duty may employees use or be under the influence of alcohol, narcotics, intoxicants, or similar mind-altering substances. Employees found to be under the influence of or consuming such substances will be immediately removed from the job site. The importance of a drug-free environment will be emphasized. Every safety meeting will include EM-385-1 Section 01.A.02 as part of the instruction. ACTIVITY HAZARD ANALYSIS Prior to commencement of any single phase of debris collection, site management, or debris reduction activities, the project manager and/or health and safety officer will address the particular concerns associated with the work area. These concerns include: . Physical hazards- uneven or soft earth roads, stones, exposed power lines, or sources, and any other obvious hazards . Chemical hazards- emissions/odors, eye or respiratory irritations, and airborne particulate problems . Traffic and personnel access and egress routes . Heat Stress . Cold Stress . Noise Hazards . Equipment Hazards . Other concerns such as weather conditions (lightning, severe wind, etc.) . A site-specific health and safety plan will be completed for each major area of operation. 6. QUALITY CONTROL PROGRAM QC PERSONNEL QUALIFICATIONS 57 ~ () Q Senior Quality Control Officer Chuck Prieur is Quality Control Systems Manager. Mr. Prieur worked extensively in East Baton Rouge, St. Tammany, St. Charles, and Plaquemines Parishes on the Hurricane Katrina Louisiana OOTO project. He started his own business in 1985, with the acquisition of a full service gas station. His business expanded to own and manage four stations. Mr. Prieur served as a liaison to Shell Oil on Dealer Related Issues as well as served as a consultant to Shell Oil for purposes of developing a new business model. He also owned and managed a full service financial services company for six years. He majored in accounting at the University of Louisiana-Lafayette. He is certified in Asbestos Supervision and N.I.M.S. Quality Control Management Dan Crowley is Safety Manager. Dan joined ORC in September of 2005 as a project supervisor for Tangipahoa Parish on the Louisiana OOTO project. The landfall of Hurricane Rita took Mr. Crowley to the City of Beaumont, Jefferson County, Texas where he was the project manager and oversaw the removal and recovery of 900,000 cubic yards of debris. The 2005 stonn season also took Mr. Crowley to Miami-Dade County following Hurricane. He was the Project Manager there and oversaw the recovery of 226,000 cubic yards of debris. Prior to joining ORC, Dan worked as a manager for over 5 years, where supervised 20 employees daily, customer relations, accounting, logistics and inventory. He graduated from Brother Martin High in New Orleans, Louisiana in 1998. He attended the University of New Orleans, New Orleans, Louisiana, where he studied business management. Mr. Crowley holds certifications in Asbestos Supervision, OSHA General Industry, and N.I.M.S. Kristy Fuentes is Area Manager. Ms. Fuentes has extensive experience in management, contracts, and documentation. Prior to joining ORC, Ms. Fuentes served in office management and accounting roles for civil engineers Jeffrey, Thomas, A vegno, Inc. (1992-94), executed real estate contracts and documentation for attorneys Casey, Babin, & Casey (1995-1998), and in management and project management for LASH Homes, Inc. (1998-2004). Beginning in 2004, Ms. Fuentes owned her own business and managed nine employees. Since joining ORC in 2005, Ms. Fuentes has managed our regional office and provided project management and documentation support for all of ORC's Louisiana projects including the LAOEQ "Katrina Car" Vehicle Removal contract, South Shore Harbor (New Orleans), the LAOEQ "Chris and Shane" project, a St. Bernard Parish FEMA trailer contract, St. Tammany Parish drainage system debris removal, and a GOVERNMENT Earthen Clay delivery contract. She also coordinated multi- million dollar shipments of materiel to Haiti in support a US State Department project work camp constructed by ORe. 58 o o ~ '-' LETTER TO QC SYSTEM MANGER July 19, 2007 Chuck Prieur QC System Manager - DRC ES 740 Museum Drive Mobile, AL 36608 Ph: (251) 243-6447 Fax: (251) 343-5554 Email: cprier@drcusa.com Subject: Responsibilities and Authorities of CQC System Manager DRC Emergency Services Quality Control Directive Mr. Prieur, Please accept this letter as your directive from DRC Emergency Services, LLC delegating authority to you as the Quality Control System Manager for the Company. With this position you have the unconditional support and authority to stop any work which is not in compliance with a specific contract. Your specific duties as QC manager are as follows, but not limited to: 1. Manage all quality control for debris removal missions 2. Outline the duties of Quality control organization for DRC on each task order 3. Disseminate information to all employees regarding quality control and safety 4. Manage overall safety in conjunction with safety manager for debris operations 5. Manage overall eligibility for debris operations 6. Stop any non compliant work 7. Oversee and manage all Quality control reports that are reported on a daily basis 8. Maintain a safe, professional and compliant work atmosphere 9. Daily safety & quality control meetings with COR and GOVERNMENT inspectors as directed by the KO. Please pass on letters to all other QC personnel directing them of their responsibilities and duties. Do not hesitate to bring all issues regarding Quality Control and Safety on any DRC project to my attention. Sincerely, Mark Stafford Chief Operating Officer 59 o Q ~ SAFETY Training and Communication . Provide a general safety orientation for employees . Train supervisors and managers in their responsibilities . Inspection of facilities, work sites, material, equipment Enforcement . Assure safe job placement and assignment . Conduct hazard analysis of existing facilities and operations . Study hazards of planned and proposed operations . Accident investigation . Audit safety perfonnance . Conduct research on technical safety problems Accounting . Maintain the accident record keeping system . Maintain documentation on all aspects of the injury and illness prevention program Personal Protective and Safety Equipment Employees shall use any personal protective and safety equipment (PPSE) which may be required to maintain their exposure within acceptable limits. The contractor shall ensure that employees receive training in and use and maintain their exposure within acceptable limits. All PPSE shall properly fit the employee. Eye protection equipment shall meet the requirements of ANSI standard Z87-1. Head protection shall meet the requirements of ANSI Z89.1. Employees shall be physically able and medically detennined qualified to use the personal protective and safety equipment, which may be required in their job duties. Users of PPSE shall be trained in and knowledgeable of the use, limitations, inspection, and maintained in serviceable and sanitary condition as recommended by the manufacturer. All PPSE shall be inspected regularly and maintained in serviceable and sanitary condition. Defective equipment shall not be used. Before being stored or reissued to another person equipment shall be cleaned, disinfected and repaired. Machinery and Mechanized Equipment Before any machinery or mechanized equipment is placed in use, it shall be inspected and tested by a competent person and certified to be in safe operating condition. Inspections and tests shall be in accordance with manufacturers' recommendations and shall be documented. Records of tests and inspections shall be maintained at the site by the contractor, and shall be made available upon request of the designated authority, and shall become part of the project file. All machinery and equipment shall be inspected daily to ensure safe operating conditions: certified persons will conduct the daily inspections and tests. Debris Collection Each location where debris collection is done shall be under the direction of a qualified supervisor. Electrical equipment or conductors in the vicinity shall be considered energized. Prior to collection operations, the employee shall consider: . Trees and the surrounding area for anything that may cause trouble when the trees are loaded. . Shape of the tree, the lean of the tree, and decayed or weak spots 60 o o ........... ~ . Wind force . Location of people . Electrical hazards . Traffic control devices/ personnel The work area shall be cleared to ensure safe working conditions. Brush and logs shall not be allowed to create a hazard at the work site. Logs and brush shall be securely loaded onto trucks in such a manner as not to obscure tailor brake lights and vision, or to overhang the side. DEBRIS ELIGIBILITY One of the key elements of debris operation quality control centers on debris eligibility. Debris Eligibility is defined as debris which has been deemed eligible by a GOVERNMENT directive usually based on FEMA's Guidelines dictated in the Stafford Act. In most cases this refers to debris that was generated as a result of a specific disaster event such as hurricane. All other debris and waste not generated by this specific event in most cases is in- eligible. DRC will provide expert quality control in area of eligibility to ensure that all our crews have specific guidelines that are consistent across the entire project on what debris is actually eligible under a specific Debris Mission. DRC will provide daily inspection of debris collection crews to monitor the debris and its eligibility. All debris must have been placed on the Right of Way (ROW) for collection or designated by an address in a Right of Entry (ROE) removal program to meet most eligibility criteria under FEMA Funded Projects. Any crew that is found operating outside the assigned work zone, off the ROW or specific ROE will be terminated and reported to GOVERNMENT. DRC will achieve this level of quality control of debris eligibility by having QC managers in the field, at TDSRSs, and random spot checks by Area and Sector Managers. Dissemination of the proper instructions to crews is critical to successful control over eligibility; DRC will provide this information by distribution of information via central points such as the TDSRSs and staging areas. PROTECTION OF INFRASTRUCTURE The protection of infrastructure is critical to a recovery operation. Examples of infrastructure items that are vulnerable during a debris operation are as follows: I. Road, Street & Highway wearing surfaces and ROW's 2. Street and Traffic Signs 3. Traffic Signals and Lights 4. Power lines and Poles 5. Phone lines 6. Cable Lines 7. Sewer, Water and Gas Utilities 8. Individual Property Items 61 o " IQ It is essential to provide oversight of these items by instruction and monitoring by our quality control staff. All crew supervisors are required to report directly to our sector QC mangers on all damage issues to infrastructure. Protection of Infrastructure is also a element vital to the overall health and safety of our crews and citizens. Trucks striking power lines and other utilities can cause serious injury and even death from careless activities during recovery. For example, DRC crew leaders are instructed to ensure that each and every load is trimmed and inside the body of the hauling unit; this nearly eliminates the possibility of overhanging debris that can cause a power line break and create an electrical hazard. DRC operates a damage hotline on all projects. There will be a complaint manger assigned to each specific mission that is responsible for handling all infrastructure damage and repair. This program will be announced in the affected area by various means of pubic service announcements (PSA's) detailing our (800) number and response team. The protection of infrastructure begins with the quality control over the entire mechanical operations of the recovery and is completed by the quick, effective response and repair. DRC will investigate all damages and complaints immediately and make resolutions within 24 hours. Critical items will be mitigated on the spot. PROPER LOADING AND UNLOADING OF TRUCKS Proper Loading and Unloading of Trucks The quality and safety standards of the loading and unloading functions during a recovery operation are handled by management of DRC and supplemented by primary subcontractor management. Loading Loading of debris from ROWand ROE's can be potentially dangerous, inefficient and In- eligible. Items of concern are: I. Segregation of Waste 2. Bunching of debris 3. Removal methods and equipment 4. Safe Loading of debris 5. Traffic Control 6. Eligibility Monitoring 7. Truck ticketing - documentation 8. Loading residuals at debris site for final disposal 62 o c Q DRC will direct all loading operations through its project managers, quality control managers, supervisors and primary subcontractor supervisors. Infonnation and examples will be distributed to all crew loading operations. Copies of the Manuel on Unifonn Traffic Control Devices (MUTCD) will be available for all DRC Loading crews at our local office or command center. Haul out loading will be specifically addressed for quality control in the site specific QC and Safety plan once the site is selected. Unloading of Trucks Unloading of various debris at the temporary debris storage site (TDSRS) and final disposals area shall be monitored for quality control through DRC Dumps site managers and Dump site QC managers. Items of concern are as follows: 1. Waste pile management (HHW, C&D, Vegetative) 2. Proper construction and maintenance of containment areas 3. Site Safety 4. Site ingress and egress 5. Traffic flow control 6. Reduction management unloading of trucks 7. Inspection Tower The inspection towers at the unloading sites are key to quality control of the unloading operation. All trucks are inspected for loads coming into the site and monitored for empty trucks leaving the dump site. This monitoring activity helps ensure the validity, safety and quality of this operation. The tower shall be constructed in accordance with GOVERNMENT guidelines and positioned in such a manor to allow trucks to safely exist the roadway and line up for load verification. The tower shall be positioned at a minimum 300' from the entry point in any site. It is key to quality control at any unloading site to mange trucks entering, waiting and exiting the site. This will ensure a safe site and help maintain a high level of production along with reducing environmental risks associated with unloading of debris. Quality control will be achieved through on site management, daily meetings, specific plans and the implementation of these plans. TRACKING OF HOURLY RATE TASKS DRC has in place the staff and procedures to accurately and efficiently handle the tracking of hourly rate task and documentation. The quality control of such documents begins in the field. The data will be collected with direct supervision from DRC; all trucks and equipment will be monitored while any work is taken place. 63 o " ,.- .,. - This information will be manually collected on hourly log sheets or by individual tickets for each piece of equipment, truck or personnel. The log sheets or tickets will be solely in the possession of a DRC supervisor at all times. At the end of each day, the DRC supervisor will review the log sheets with the GOVERNMENT inspector and check for complete accuracy of the information. Both the DRC supervisor and the GOVERNMENT inspector will sign the daily report and each party will retain a copy of the report. Any changes to the infonnation will be corrected on a daily basis. Once the daily logs are collected and signed, they will be forwarded to DRC's corporate office to be compiled in to summary sheets for preparation of invoicing. DRC operates a full time date center at its head quarters in Mobile, AL; it is staffed 7 days per week! 24 hrs per day during any large scale event. The summary of the daily log sheets and all back up documentation will then be forwarded back to DRC's project manager on location. DRC will present this information to GOVERNMENT for the purpose ofreconciling all infonnation and certifying the accuracy. Any changes would be made at this time an the documentation would then be used in the preparation of the official invoice to the Government. This is our check and balances system for documentation of hourly rate task in a condensed version. This level of quality control over documentation virtually eliminates potential mistakes, errors and inefficiencies. DRC's project manager and quality control manager along with the QC sector managers will perform routine and surprise checks over our crew supervisors and data collectors. These inspections will serve as the quality control for the potential fraud and manipulation of field data. At any point the QC managers or supervisors are alerted to potential quality control issues with tracking of documentation, they are immediately required to notify the project manager who will then report directly to the COR. PRIV A TE PROPERTY DEBRIS REMOVAL When requested by the GOVERNMENT, DRC will initiate a Private Property Debris Removal Program. DRC and its subcontractors have initiated and managed Right of Entry (ROE) programs to remove debris on private property and/or demolish private structures that present a public safety hazard. R.O. E. programs may be managed as follows: RIGHT OF ENTRY (R.O.E.) PROGRAM A. COMMENCEMENT OF R.O.E. PROGRAM I. R.O.E. operations will commence upon receipt of a specific task order and notice to proceed from the Government. 2. R.O.E. operations will proceed in an orderly and manageable fashion on publicly and privately owned properties as designated by the Government task order. B. R.O.E. DOCUMENT A TION CHECKLIST I. Identify affected properties with Government Agency Personnel 64 - o 2. Computerize a detailed listing of all affected properties, to include: A. Description B. Damages C. Owner with contact information D. Identification of Task Order E. Progress of Work F. Sign-off and release G. Any peculiarities pertaining to entry or safety H. Certification that property is vacant and all valuables have been removed if demolition to occur. I. Location of unseen obstructions 3. Obtain signed right of entry agreement from owner to include: A. Right of Entry Agreement B. Hold Harmless Agreement (to protect contractor, subcontractors, County/City, and FEMA from claims) C. Non-duplication of Benefits fonn to ensure owner does not receive both federal assistance and insurance proceeds for the same work. 4. Assess the property thoroughly with Government Agency and obtain detailed scope of demolition and/or work to be performed from the Government for reach site. 5. Obtain proper pennits and/or Condemnation Certificates for work, if required. 6. Prepare drawings and/or photographs of each site from multiple angles to document condition of property prior to entry. 7. Enter photographs into computer under particular ROE file. 8. Prepare and maintain computerized schedule and daily progress of work. Update daily for a continuous mechanism to track programs and completion of all ROE's. 9. Government shall clearly designate and physically make each property to be entered and/or demolished. 10. Clearly locate, mark and/or protect all utilities. Tenninate utilities at street if part of task order. Electricity and gas to be terminated by utility company, if appropriate. II. Dispatch Superintendent and Subcontract crew to site to perfonn debris removal, demolition and/or such other tasks on the private property as may be directed by the Government Agency. Q Q C. FIELD SUPERVISORS/CREW FOREMEN/SUBCONTRACTORS I. Field supervisors and subcontractors will report to the senior field supervisor or project manager. 2. All supervisors will be responsible to ensure work is conducted only on those properties designated by the government. Supervisors will not allow work to commence in additional areas until directed by government task order. 3. Supervisors shall be responsible for the safety of all personnel and equipment. 4. Supervisors will be responsible for collection of daily personnel and equipment time logs, and their distribution to the Company designated 65 o o representative with a copy given to the government, and/or subcontractors, as appropriate. 5. Crew foremen will report to their designated supervisor. 6. Foremen and/or clerk of the works will be responsible to ensure work assignments received from their supervisor are completed to the requirements of the government task order. 7. Foremen and/or clerk of the works will be responsible for maintaining the daily personnel and equipment time logs. D. OPERATIONS I. Demolition operations will be conducted only on properties as instructed by Government task orders. (Utmost care must be exercised to ensure only the authorized and designated properties are entered and/or structures are demolished and that only the portions of the debris and/or structures as authorized are removed.) 2. All debris will be picked up and loaded into haul trucks in a safe and workman-like manner. Debris shall be trimmed to ensure a safe load. Safety will not be compromised. 3. All crew foreman and field supervisors will be responsible to ensure a rapid and cost effective as possible operation. 4. Hand crews, to ensure maximum production and safe operation, will assist heavy equipment operators in avoiding areas of concern, such as septic tanks, water meters, power lines, etc. 5. All construction and demolition materials will be sized using heavy equipment to ensure maximum loading and safe transport of materials within EP A and DOT standards if applicable. 6. Obvious hazardous materials will be dealt with in accordance with the Government task order and the Corporate Environmental Protection Plan. 7. Traffic control personnel, with appropriate traffic control and safety equipment, will be stationed as appropriate, at each approach point of the work area to maintain traffic control and prevent personal injury. Additional traffic control personnel will be stationed throughout the area, as needed, to ensure safe operations. E. COMPLETION AND CLOSE OUT I. Upon completion, the property shall be inspected by Government Inspectors and preferably by the Property Owner. 2. A Completion Certificate should be obtained from the Government Inspectors, signed by them and preferably the Property Owner. 3. Such Completion Certificate should certify also the lack of damages to the property, to any items remaining on the property at the instruction of the Government, and the lack of damages to any adjacent property. 4. Upon completion of the work, pictures are taken of the property from the same sides to document the completion of the ROE. 5. The Completion Certificate should then be added to the computerized ROE Matrix and become part of the final documentation for payment. o DEMOLITION 66 '-J g o QUALITY CONTROL AND PROTECTION: A. DRC will perfonn demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures. B. DRC will provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations. C. DRC will maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled. D. DRC will provide enclosed dust chutes with control gates from each floor to carry debris to truck beds and govern flow of material into truck. Provide overhead bridges of tight board or prefabricated metal construction at dust chutes to protect persons and property from falling debris. E. DRC will prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum. Do not use water if it results in hazardous or objectionable condition such as, but not limited to; ice, flooding, or pollution. Vacuum and dust the work area daily. F. In addition to previously listed fire and safety rules to be observed in perfonnance of work, include following: I. No wall or part of wall shall be permitted to fall outwardly from structures. 2. Maintain at least one stairway in each structure in usable condition to highest remaining floor. Keep stairway free of obstructions and debris until that level of structure has been removed. 3. Wherever a cutting torch or other equipment that might cause a fire is used, provide and maintain fire extinguishers nearby ready for immediate use. Instruct all possible users in use of fire extinguishers. 4. Keep hydrants clear and accessible at all times. Prohibit debris from accumulating within a radius of 4500 mm (15 feet) of fire hydrants. G. Before beginning any demolition work, DRC shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of Air Force any damaged items shall be repaired or replaced as approved by the Contracting Officer. DRC shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. DRC shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition or removal works. Repairs, reinforcement, or structural replacement must have Contracting Officer's approval. 67 o o Q CLEAN-UP: On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to Contracting Officer. Clean-up shall include disposal of all items and materials not required to remain property of the Government as well as all debris and rubbish resulting from demolition operations. DAILY REPORTS DRC ES shall submit daily progress and quality control reports to the governing entity for all activities. Each report would contain, at a minimum, the following information: I) Letterhead with DRC name and contact information 2) Report Date 3) Location of completed work 4) Location of work for next day 5) Daily and cumulative hours for each piece of equipment and crew (Emergency Clearance) 6) List of roads that were cleared (Emergency Clearance) 7) Number of Crews (including number of trucks and loading equipment) 8) Daily and cumulative totals of debris removed, by category 9) Daily and cumulative totals of debris processed, to include methodes) of processing and disposallocation(s) 10) Daily estimate of hazardous waste debris segregated, and cumulative amount of hazardous waste placed in the designated holding area II) Number of hazardous trees and hanging limbs removed. 12) Problems encountered or anticipated Typically, Daily Reports are co-signed by the governing entity's inspector to verify work performed. In addition, the governing entity receives an original copy of all load tickets and receives and verifies for co-signature, a Daily Reconciliation Sheet listing each load ticket, the truck number, crew number, street, truck volume, percent full, credited volume of debris removed and the total volume removed for the day. This Daily Reconciliation Sheet is typically verified by the governing entity and becomes the invoicing document for the Contract. 7. RECYCLING PLAN Ve2etative Debris: Vegetative debris such as trees, stumps, brush, and leaf and yard waste make up the largest portion of the debris produced during tornadoes, hurricanes, and other natural disasters. Vegetative debris can be collected, stockpiled, and processed to the specifications of a mulch or boiler fuel product. Although some local governments have purchased wood processing equipment, others find it more cost effective to contract out the services. 68 o A22re2ates: Large amounts of aggregate debris such as asphalt pavement and concrete may result from the destruction of roadways during disasters. These materials can be collected, stockpiled, and processed to the specifications for road base aggregate or solid fill material. Construction and Demolition Debris: Another large component of disaster debris is the construction and demolition (C&D) material that results from the destruction of homes, commercial and non-commercial buildings, and other structures. The materials produced from these sources may include wood, aggregates, metals, gypsum, plastics, and other miscellaneous components. These materials can be managed by using existing recycling facilities, and supplemented by establishing temporary C&D processing sites in areas where adequate recycling infrastructure does not exist. White Goods and E-waste: Televisions, computer monitors, DVD players, radios and cell phones. Electronics contain a hodgepodge of metals and materials that can be dangerous, given the large numbers that are likely to be thrown out in a hurricane's aftermath. Older electronics can contain lead, chromium, cadmium, mercury, nickel and zinc, all toxic to humans. However a number of materials like metals and plastics in electronics can be recycled, reducing pollution while saving energy and resources. Freon and metals recovered from white goods are thoroughly recyclable and marketable. Revenue generated from the recycle of such wastes is typically returned to government entity following cost. Other innovative recycling strategies DRC will explore depending on the setting and scope of an event: (> Development of crib-walls using large woody debris: Tree limbs that are currently being ground- up or are intended for incineration may instead be fashioned into crib-walls for wetlands protection and restoration. Crib-walls may also be fashioned without lumber by interlocking and binding limbs into non-wildlife trapping structures that resist erosion, precipitate sedimentation, and otherwise promote the restoration of the regions protective coastal fringe. Composting to produce valuable fines and to decontaminated materials: Wood chips, contaminated sediments, and other organic debris may be blended into windrows for thern1al composting, such as is used to recycle green waste in many cities, and to decontaminate hydrocarbon-affected soils in remedial actions. Windrow turners, such as pictured at right, mix and oxygenate the organic materials. Other, more-compact composting methods are also available using containerized systems The end result is humus, which may be used for wetlands restoration, soil building, and mulch. Segregation of bricks and aggregate for low-grade structural uses: Solid materials such as brick, fractured brick, cinder block, and aggregate may be segregated from the waste stream and used for structural applications such as erosion control, diversion features, landscape elements, and light-duty pavements. Recvcling of glass and ceramics into durable fines: Bottles, windows, and wall elements may be ground into sand-like fines for structural applications as described above, and also for wetlands restoration and beach renewal. o 69 ~ C) Q Recovery of copper and other metals: Copper wire and other metals may be separated and profitably recycled into new wires, signs, and light-duty structures, as was done by Florida Power and Light after Hurricane Andrew. Production of biofuels for distributed use: The organic fraction of the debris stream may be pulverized and fashioned into high-BTU pellets, or anaerobically digested into natural gas. The production and sale of refuse-derived energy is economically rewarded because renewable energy credits may be sold along with the energy produced. While this may involve an out-of- state company with significant experience in this area, the Subcommittee is mindful that a local project developer should remain involved. In response to past events and contracts, such as the removal of vehicles from Southeaster Louisiana following Hurricane Katrina or the removal ice storm. Some examples of recycling resources that DRC has used in recent events and contracts include: Southern Scrap Material 480 I Florida Ave New Orleans, LA , 70117-3915 Phone: 504-942-0502 FAX: 504-834-9004 Lafarge North America 12950 W orldgate Drive Suite 500 Herndon, VA 20170 TeI:( I) 703 480 36 00 Fax: (1) 7037962215 c.R. Peele Construction Home office: Jacksonville, NC Contact Person: Ray Peele Phone: (910) 340-4412 70 ~ , -=- DRC Emergency Services, LLC 740 Museum Drive. Mobile, Alabama 36608 1-888-721-4372.1-251-343-3581. FAX 1-251-343-5554 APPROACH TO SUBCONTRACTING DRC ES has implemented an aggressive and nationally recognized outreach program entitled the, "DRC ES LOCAL SUBCONTRACTOR RESOURCE PROGRAM" DRC ES reaches out to local, small, minority and women owned (SMWB'S) companies with a variety of tools. DRC ES representatives are dedicated to working closely with local Minority and Women Business Enterprise's (M/WBE) small business liaison to contact companies that are approved and certified by M/WBE as small, disadvantaged, minority, veteran and women owned businesses. Immediate contact will be made with the Minority and Women Business Enterprise office to schedule an informational workshop for potential vendors and businesses. These sessions provide "hands on" technical assistance to companies ranging from individuals owning dump trucks and loading equipment to office supply companies and small printers wishing to provide goods and services. DRC ES is committed to seeing that local companies are made aware of all potential contracting and partnership opportunities. In addition, because of their close connection to the federal dollars provided by FEMA, The Congressional ~ Delegation will be contacted and their staffs briefed on the program for their constituent companies. Lastly, an aggressive direct mail program can be conducted to target companies, and minority business organizations that are listed with the Office of Minority and Women Business Enterprise. This mailer can provide information as well as an 800 number for interested individuals and companies with bi-lingual assistance available when necessary. The development and implementation of this program is coordinated by Tom B. Combs. Mr. Combs, Director of Governmental Relations, has over 20 years experience in SMWB development. Having served as founder and Executive Director of The Bid Resource Center that was the nation's second and largest non-profit assisting SMWB'S in securing government contacts. From there he went on to serve as Mayor Pro Tem and Congressional Chief of Staff and Director of the John Gray Institute developing SMWB programs across the state of Texas and the nation. DRC ES "LOCAL SUBCONTRACTOR RESOURCE PROGRAM" not only drastically improves small and minority business participation, but also shows the commitment of DRC ES to ensuring that the entire community has the opportunity to participate. The DRC ES technical assistance workshops not only assist companies with identifying potential contract opportunities, but also assist those interested with "teaming". This process matches MBE's/WBE's with others so it strengthens there competitive position and package of goods and services offered. "Teaming" can greatly increase MBE/WBE participation because of the "strength in numbers" concept. ~ DRC ES is committed to ensuring that any emergency response business activity is shared by the entire community. Our innovative programs ensure that minority participation is not just a goal but a reality. . Q c ORC EMERGENCY SERVICES, LLC Daily Site/Tower Sheet Date: Daily Grand Total: Page of Tower/Dump Location: Cubic Yds Ticket No. Approved Comments/Initials Total: Total: AUTHORIZED SUPERVISOR FOR DRC EMERGENCY SERVICES, LLC AUTHORIZED GOVERNMENT INSPECTOR o DRC Emergency Services, LLC 740 Museum Drive. Mobile, Alabama 36608 1-888-721-4372 . 1-251-343-3581 . FAX 1-251-343-5554 KEY PERSONNEL Key personnel of DRC Emergency Services, LLC (DRC ES) and the DRC family of affiliated and associated companies, subcontractors, contract reservists and associate personnel have been involved in hurricane emergency responses for many years, since as early as 1961. For the past 18 years, this team has responded to major natural or man- made disasters occurring within the continental United States and its territories, in theatres of U.S.-led troop operations, and in Central America. These personnel are trained, motivated and available for immediate deployment for emergency response. Many are N .LM.S-certified and/or have specialized training in safety and asbestos management and are equipped with utility vehicles, digital, handheld, multi-state, two- way radios, cellular communications, and handheld computers. Under normal circumstances each will have the experience and/or training to respond immediately to disasters and is typically provided with a DRC ES supervisor handbook including required reports and forms for successful disaster response and management thereof. Professional Recognition o DRC ES and its affiliates are leaders in the field of disaster management and emergency recovery. Many DRC ES and affiliate employees, subcontractors, associates, and contract reservist personnel have specialized training for emergency management and/or have attended multiple industry seminars and conferences. DRC ES, its subcontractors, and/or personnel as described above are or have been members of many professional organizations including NEMA, APW A, SW ANA and the Society of American Military Engineers. DRC and/or its' affiliates, associates and/or subcontractors are licensed General Contractors in several states. DRC ES is familiar with USACE, FEMA, and FHW A rules and regulations, the Stafford Act, and 44CFR as they pertain to emergency response, recovery and reimbursement. Commitment to Ethics: Prevention of Fraud, Waste and Abuse The senior management and key personnel of the DRC family of companies is committed to the highest standard of ethical conduce. DRC ES through its ethics program has a zero tolerance policy and aggressively investigates and attempts to rectify any suspected instances of fraud, waste and/or abuse. DRC ES is led by a former F.B.L special agent and is committed to criminal prosecution of culprits in fraud and to arranging for complete and immediate refunds of any ill-gotten gains. o DRC ES will assign, as required, fonner FBI, DEA, and/or FEMA investigators and/or auditors to attempt to ensure against and reduce instances of fraud, waste and abuse. Our Project Managers, Supervisors, and Foremen are typically trained in fraud reduction and (> detection and report any suspected instances thereof to Project Managers, to assigned internal auditors and/or to counsel. DRC ES has also established a very detailed ethics program with procedures to detect some of the obvious and easier ways that fraud occasionally occurs. For instance, typically, no DRC ES or subcontractor employees are allowed to participate in the measurement of trucks; this is entrusted to local government, USACE, state EMA and/or FEMA officials. DRC ES utilizes a detailed measurement documentation program to ensure the integrity of the haul and vehicle measurements and the safety and integrity of the vehicles and their drivers. DRC ES has a detailed and specific program of ticketing and reconciliation verification that, we believe, meets or exceeds the USACE and FEMA requirements and has instituted additional programs and procedures to ensure to protect to the greatest possible extent against fraud, waste, and/or abuse. There are 18 (eighteen) management personnel who will be dedicated to this contract. Their names, titles, and responsibilities are outlined as follows. DRC ES Senior Management o Robert J. Isakson is Managing Director of DRC ES. Mr. Isakson was a founder and serves as Secretary/Treasurer and Managing Director of DRC, Inc., and the majority of its associate and affiliate companies which are actively engaged in building, marine, road and civil construction, disaster reconstruction, demolition, hazardous waste remediation and disposal, and landfill management services worldwide including recent contracts in war-torn Kuwait, Somalia, Kosovo, and Iraq, in addition to numerous contracts with hurricane, ice storm, typhoon and flood ravaged cities, counties, states and territories. He is also a Director of the Claridge Group, a licensed real estate brokerage firm, fonned in 1986 and has been active in construction, development, landfill management, disaster reconstruction and restoration projects for the past twenty-five or more years. Previously, Mr. Isakson was a Special Agent with the Federal Bureau of Investigation of the United States for ten years, serving as a Supervisor in charge of "white-collar" crime and political corruption in the State of Louisiana. He was also one of the founders of AI-Ayoub Marr Bell Trading and Contracting, W.L.L., a construction and life support service company founded in Kuwait, and directed its international operations from its inception. Mr. Isakson has served on the Board of Directors and as the Managing Director of MANCO Recruiters International, a worldwide manpower recruitment firm registered and headquartered in Delhi, India and on the Board of Directors of New Gurkhas International, Kathmandu, Nepal. He has worked and traveled throughout over 100 countries and territories on six continents and is intimately familiar with international corporate and business development, finance, landfill management, recycling, hazardous waste remediation and removal, and civil construction. Mr. Isakson holds a B.B.A. in accounting from Lamar University in Beaumont, Texas. o 2 o Thomas M. Marr, Sr., is Member ofDRC ES. Mr. Marr is one of the founders ofDRC, Inc. and has directed overall operations and management since inception. He is forn1er Assistant Attorney General for the State of Alabama, and was a Member of the State of Alabama Legislature and the State of Alabama Constitutional Committee. He also served as President and Chairman of the Board of Deposit National Bank of Mobile and Director of Compass Bank of Mobile. Mr. Marr holds a degree in civil engineering and is a practicing attorney licensed in the State of Alabama since 1957. Mark Stafford is Chief Operating Officer of DRC ES. Mr. Stafford has many years of experience in disaster and commercial and industrial waste management and has participated in recovery following ice storms and hurricanes throughout the Southeast. He has overseen and operated landfills, recycling operations, and transportation companies exceeding $200 million in annual revenues. He has managed teams of over 1100 staff serving business, industry, and municipalities. Previous to joining DRC, he was the President and Regional Director of Allied Waste for the State of Louisiana. He also worked in an executive capacity for Waste Management. He handles the day to day operations and marketing for DRC Emergency Services. Mr. Stafford earned a B. S. in business from the University of Louisiana Lafayette. Project Management and Business Development o Paul F. Persons, Jr. is Vice President for Project Management and Business Development, on a consulting basis, for the DRC family of companies. He is the proposed project manager for the potential contract. Mr. Persons controls project estimating and bid proposals from DRC ES's Mobile, Alabama headquarters. Mr. Persons has served as a Senior Project Manager for several multi-million dollar disaster management and debris removal contracts. He has also served as Safety Officer on a major mechanical infrastructure project in Latin America (Honduras) and worked overseas during the Kosovo Conflict as a project and account manager for DRC. Mr. Persons is currently Senior Construction Manager and Project Estimator for U.S. Coast Guard facilities ID/IQ Contract with DRC throughout the mid-Atlantic states of North Carolina, Virginia, Maryland, Delaware, New Jersey, and New York. In 2004, Mr. Persons served as Senior Project Manager for several multi-million dollar recovery projects in the aftermath of Hurricanes Charley, Frances, Jeanne, and Ivan, including the massive restoration of 15 miles of beachfront destroyed in Escambia County, Florida during Hurricane Ivan. As Director of Operations during the 2005 hurricane season, he was in charge of over $100 million in contracts. Mr. Persons holds a B.S. in building science from the School of Architecture at Auburn University. o Lee Wilson is Senior Project Manager, is one of the most trusted and respected managers at DRC. Mr. Wilson has forty years of extensive and invaluable experience in the civil construction industry. Mr. Wilson has for the last twenty years, acted extensively in the capacity as a project manager and estimator, building airports, interstates, state, city, county projects including water and sewer, stonn drain, and large excavation projects. While with DRC, Mr. Wilson managed the Martin County, Florida project in 2004 which accounted for 1.1 million cubic yards of debris recovered and processed. Lee managed 3 . . o the demolition of 417 homes for the University of South Alabama, Mobile, Alabama. Within hours of the landfall of Hurricane Katrina he was on site in Louisiana leading the project in East Baton Rouge. Mr. Wilson has since and is currently working on the Louisiana DOTD project and is responsible for the management ofthe project for debris removal that encompasses thirteen parishes. He has personally overseen the management of this project that accounts for the recovery of 2.2 million cubic yards of debris. Mr. Wilson has international project management experience that extends as far as Nogliki, Russia where he served as Civil Engineering Consultant to Exxon Mobil in the building of an airport, a project valued at $58 million. He was the Construction Manager managing and overseeing the installation of water and sewer infrastructure for an entire country in Central America o Eli Zatezalo is Director of Marine Services. Prior to joining DRC, Mr. Zatezalo was the Managing Partner of Blake Marine Group LLC, a marine based company specializing in salvage and brokerage as well as a partner in Gulf Coast Marine Recovery LLC. Mr. Zatezalo was residing in Biloxi, Mississippi when Hurricane Katrina made landfall. After surveying the extent of the damage he immediately went to work securing salvage, demolition and marine debris removal contracts. These included the opening/demolition of the Highway 90 Bascule Bridge in Bay St. Louis for the Mississippi Department of Transportation (MDOT), the marine based demolition and salvage contract for Harrah's Casino - Lake Charles and numerous salvage contracts for commercial vessels and barges. Mr. Zatezalo has been instrumental in the recovery of vessels in need of salvage due to past hurricanes. Before entering the salvage business, Mr. Zatezalo specialized in marine transportation of vessels via the load on / load off method utilizing ship based cranes. Previously he was a captain and engineer on vessels ranging in size from 72ft. to 211 ft. Since joining DRC, he has managed and supervised all marine debris projects including those in Monroe County, Florida and Plaquemines Parish, Louisiana as well as our extensive participation in U.S. Coast Guard projects on the Gulf Coast. He is also a veteran of the US Anny. Dr. Walter Maestri is Emergency Management Consultant. Dr. Maestri served for over a decade as Director of Emergency Management for Jefferson Parish, Louisiana, playing a key role in preparation and evacuation planning for Louisiana's largest suburban parish. His expertise and experience have been utilized by federal and state emergency planners as well as nationwide news networks over the past ten years. Most recently, Dr. Maestri served the citizens of his parish and state with distinction during Hurricane Katrina and its aftermath, the nation's worst-ever natural disaster. He has authored over a dozen publications and presentations on emergency management, has ten different certifications from the Emergency Management Institute and the Federal Emergency Management Agency, and holds a bachelors degree from Spring Hill College in Mobile, as well as a doctorate from the University of Southern Mississippi. Q Daniel Craig is Federal Emergency Management Consultant. Mr. Craig most recently served as Director of the Recovery Division for the Federal Emergency Management Agency of the United States Department of Homeland Security. He was appointed by President Bush in 2003 as the Director of the Recovery Division and was responsible for 4 o overseeing the Federal government's recovery efforts on all Presidential declared events including the Space Shuttle Columbia crash, the wildfires of 2003, and the hurricanes of 2004. Prior to being the Director of the Recovery Division, he was the Regional Director for the New England area where he was responsible for all FEMA mitigation, preparedness, response and recovery, and training activities in the six New England states. He holds a bachelors degree from Purdue University. o Tom B. Combs is Director of Governmental Affairs, Regional Manager for Texas and Oklahoma, and Emergency Housing Coordinator. Mr. Combs joined the DRC team on a consulting basis in 2002 and brings over 25 years in "hands-on" housing experience. Previously, he spent over 1 0 years in public office as City Councilman and Mayor Pro- tem for The City of Beaumont, Texas. In that capacity he served as liaison to the Beaumont Housing Authority and as President of the Innovative Housing Corporation. He also held the position of Homeless Programs and AIDS Housing Coordinator for the City of Houston. In this position he directly supervised, coordinated and monitored over 30 million in temporary, transitional, and permanent housing construction and operations contracts. Additionally, Mr. Combs served as District Director and Chief of Staff for two members of Congress where he personally directed all housing related activities and serves as liaison between the congressmen, the cities, and the Department of Housing and Urban Development. He has extensive experience in minority, women, and disadvantaged contractor outreach programs. Mr. Combs has also owned his own finn, Tom Combs & Associates, which specialized in local, state, and federal contract negotiations. He lives and is headquartered in Houston, Texas. Kristy Fuentes is Louisiana Regional Manager. Ms. Fuentes has extensive experience in management, contracts, and documentation. Prior to joining DRC, Ms. Fuentes served in office management and accounting roles for civil engineers Jeffrey, Thomas, Avegno, Inc. (1992-94), executed real estate contracts and documentation for attorneys Casey, Babin, & Casey (1995-1998), and in management and project management for LASH Homes, Inc. (1998-2004). Beginning in 2004, Ms. Fuentes owned her own business and managed nine employees. Since joining DRC in 2005, Ms. Fuentes has managed our regional office and provided project management and documentation support for all of DRC's Louisiana projects including the LADEQ "Katrina Car" Vehicle Removal contract, South Shore Harbor (New Orleans), the LADEQ "Chris and Shane" project, a St. Bernard Parish FEMA trailer contract, St. Tammany Parish drainage system debris removal, and a USACE Earthen Clay delivery contract. She also coordinated multi- million dollar shipments of materiel to Haiti in support a US State Department project work camp constructed by DRC. o Gearle Bacote is Atlantic Regional Manager. She is a native Washingtonian and has over 10 years in business development. She began her career in 1994, working for an international sports marketing company as an Executive Coordinator to the President. Ms. Bacote was responsible for the development and execution of a central command center for the 1996 Summer Olympics held in Atlanta, GA. In addition she provided protocol services for all national and international clientele during the games. She was then recruited in 1996 by Randstad (a sponsor to the 1996 Olympic Games), to establish 5 o and develop a branch office in Atlanta where she was responsible for the development, management and maintenance of a multi-million dollar account. In 1999 she joined Robert Half International, a specialized direct placement finn in Washington, D.C. where she produced over 4 million dollars in revenue, and mentored several new hires. April R. Callaway is Contracts and Pre-event Manager. For the purposes of this contract, April will also be the claim's representative for Sunny Isles Beach. During the 2004 hurricane season, she assisted in managing the Pensacola and Perdido Key Beach sand remediation and restoration projects. Ms. Callaway has also managed the introduction, maintenance, extensions and renewals of all stand-by contracts for the States of Florida, Alabama, Mississippi, Louisiana, Texas, South Carolina, North Carolina, Georgia and Virginia, as well as maintaining customer/client relations. She has been in charge of developing, promoting, and marketing DRC through various functions and conferences throughout the United States. Ms. Callaway has been extensively involved in the research, development and response to proposals for the DRC family of companies. Previously, she was in charge of all commercial construction projects for Reynolds Contracting, a residential and commercial construction and remodeling firm. She also served as a consultant on import/export commodities in Naples, Italy. Ms. Callaway received her B.S. in Business Management from the University of Maryland University College of Europe in 2004. She is N .LM.S. certified. Q Christina M. Murphy is Regional Manager for Southwest Florida. Ms. Murphy joined DRC in 2006 and has extensive experience is sales and marketing. Previously, she served as an account executive for television and radio stations across Louisiana including the CBS affiliate in Baton Rouge and the UPN affiliate in New Orleans. She also worked in business development for LIFT Productions in New Orleans. B.A. in Drama and Communications, University of New Orleans. She is N.LM.S. certified. Dan Crowley is Project Manager. Dan joined DRC in September of 2005 as a project supervisor for Tangipahoa Parish on the Louisiana DOTD project. The landfall of Hurricane Rita took Mr. Crowley to the City of Beaumont, Jefferson County, Texas where he was the project manager and oversaw the removal and recovery of 900,000 cubic yards of debris. The 2005 stonn season also took Mr. Crowley to Miami-Dade County following Hurricane. He was the Project Manager there and oversaw the recovery of 226,000 cubic yards of debris. Prior to joining DRC, Dan worked as a manager for over 5 years, where supervised 20 employees daily, customer relations, accounting, logistics and inventory. He graduated from Brother Martin High in New Orleans, Louisiana in 1998. He attended the University of New Orleans, New Orleans, Louisiana, where he studied business management. Mr. Crowley holds certifications in Asbestos Supervision, OSHA General Industry, and N.LM.S. Q Lee Wilson, Jr. is Project Manager. While with DRC, Mr. Wilson has been instrumental is the success of many projects that include the City of Jacksonville and Jacksonville Beach, FL, Daytona, FL, and Charleston, SC. Within hours of the landfall of Hurricane Katrina he was onsite in Louisiana and began work on the East Baton Rouge Parish 6 o Project. Upon completion, Mr. Wilson has since and is currently working on the Louisiana DOTD project. He has been working extensively in Washington and St. Tammany Parishes while assigned to this project. Mr. Wilson also worked in commercial construction for eleven years where he was an estimator of large scale projects as well as supervisor of a large staff of skilled individuals. Mr. Wilson then went on to start his own residential homebuilding company which he directed for seven years before joining DRC in 2004. He attended the University of South Alabama and majored in Architecture. Chuck Prieur is Project Manager and Estimator. Mr. Prieur has worked extensively in East Baton Rouge, St. Tammany, St. Charles, and Plaquemines Parishes on the Hurricane Katrina Louisiana DOTD project. He started his own business in 1985, with the acquisition of a full service gas station. His business expanded to own and manage four stations. Mr. Prieur served as a liaison to Shell Oil on Dealer Related Issues as well as served as a consultant to Shell Oil for purposes of developing a new business model. He also owned and managed a full service financial services company for six years. He majored in accounting at the University of Louisiana-Lafayette. He is certified in Asbestos Supervision and N.LM.S. o Jennifer Peacock is Business Development Manager and North Florida Regional Manager. She joined DRC in 2004 and assists with the Business Development and client relations throughout the South. Jennifer represents DRC at conferences, post-project reviews, and other various functions in addition to promoting, researching, and developing various business opportunities for the company. After Hurricane Katrina, she worked in Louisiana as part of the initial entry team setting up logistics and coordinating human and material resources. Prior to Hurricane Wilma making landfall, she was deployed to Florida to assist with the development and securing of contracts. Before joining DRC, Ms. Peacock worked for seven years in the brokerage industry, directing Fixed Income/Capital Markets for four years, executing trades in various markets including US Agencies, Corporate, Mortgage-Backed Securities, and Short-Term Money Market Securities. She is a licensed stockbroker with the National Association of Securities Dealers (NASD) and registered with the Securities Exchange Commission (SEC). Ms. Peacock also worked for three years in the U.S. Equity Markets with a national brokerage firm and was a member of an international advisory group. She graduated from the University of Alabama at Birmingham with a B.S. in Finance. She is certified in Asbestos Supervision and N.LM.S. Q Steven James, Program Director, is responsible for proposal and contract documentation. Mr. James has 10 years experience at Tulane University as an assistant dean and administrator, where he oversaw orientation, awards, and grants programs, and was responsible for the college's publications and marketing materials. Mr. James also oversaw public affairs, external and student relations, and wrote grant and development proposals for Tulane. He earned an M.A. (1990) and an M.PhiL (1992) from Yale University and a B.A.( 1989) from Louisiana State University, all in history. He is certified in Asbestos Supervision and is contractor's license qualifier in Louisiana, Mississippi, Alabama, Arkansas, South Carolina, and Virginia. 7 ~ c Q 8 o July 30, 2008 PENDING LITIGA nON DRC EMERGENCY SERVICES. LLC. The following is a list of the litigation and arbitration claims involving DRC Emergency Services, LLC, of which I, as General Counsel for many years, am aware of, as of this date: 1. Ybarzabal v. LADOT. DRC, et al: 2006 suit filed in the 22/1d District Court of St. Tammany Parish, Louisiana (2006: 1 0183) against DRC Emergency Services, LLC and others. It is alleged that a third tier subcontractor negligently directed traffic causing an accident. Insurance of one or more of the subcontractors is defending and indemnifying DRCES. () 2. American Amphibious Equipment & RentaL Inc. v. Brookhaven Maintenance South Contract Corp. CDP. DRC. et al: 2007 suit filed in 25th District Court of Plaquemines Parish, LA (No. 55-252). Suit by equipment supplier of a sub of a subcontractor. Immediate subcontractor is defending pursuant to an indemnity agreement. DRCES is withholding funds in dispute. ) SHARPE (SHA014) DRC EMERGENCY SERVICES, LLC pcndlitigdrces410811ew o \ ~- DRC Emergency Services, LLC 740 Museum Drive. Mobile, Alabama 36608 1-888-721-4372 . 1-251-343-3581 . FAX 1-251-343-5554 Index of Proposal Requirements Due: August 12,2008 @ 10 A.M. PROPOSAL RESPONSE SHEET/FEE SCHEDULE FORM/PROPOSAL SPECIFICATIONS-Please see Tab 1 PROPOSAL SECURITY-Please see Tab 2. CERTIFICATE OF INSURANCE-Please see Tab 3. CERTIFICATE OF COMPENTENCY/ SECRETARY OF STATE OF FLORIDA-Please see Tab 4. LOCAL BUSINESS TAX (OCCUPATIONAL BUSINESS LICENSE)-Please see TabS. LIST OF PROPOSED SUBCONTRACTORS-Please see Tab 16, General Operations Plan. PROPOSER QUALIFICATION STATEMENT-Please see Tab 6. NON-COLLUSION AFFIDAVIT-Please see Tab 7. NON-KICKBACK AFFIDAVIT-Please see Tab 8. PUBLIC ENTITY CRIMES SWORN STATEMENT-Please see Tab 9. ACKNOWLEDGEMENT OF CONFORMANCE WITH OSHA ST ANDARDS- Please see Tab 10. EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT-Please see Tab 11. CONFICT OF INTEREST STATEMENT-Please see Tab 12. DISPUTE DISCLOSURE FORM-Please see Tab 13. r . RFP CHECKLIST-Please see Tab 14. Statement that proposer: "hereby holds the City harmless and agrees to indemnify City and covenants not to sue the City by virtue of such rescission."- Please see Transmittal Letter. Statement that proposer acknowledges miscellaneous conditions on page 21-22 Please see Transmittal Letter. Description of Services required for proposal submission: General Operations Plan describing method and manner of debris removal- Please see Tab 15. A description of any subcontracts to be utilized in performing these services- Please see Tab 16. A summary of the submitter's personnel that will be dedicated to the contract- Please see Tab 18. A description of the accounting and financial controls that will be utilized in managing, monitoring and accounting for the resources to be deployed-Please see Tab 17. A description of any exceptions taken to the requirements stated in the rfp- Please see Transmittal Letter.