Loading...
HomeMy WebLinkAboutLink Construction Group or . '~ 'lIt:~. ; " -...... ~ con!itruction group Table of Contents...................................................................... 1 Proposal Letter............................. ............................................. 2 Bid Response Sheet..... ............ ............... ..... .... .................. ........ 3 Bid Form....... .......................................................................... 4 Certificate of Authority............................................................... 5 Bid Bond.................................................................................. 6 Insurance Certificates................................................................ 7 Copy of Licenses.. ......... ............ ................ ................................ 8 Bidder Qualification Statement.................................................... 9 o Bidder's General Information ..................................................... A.) Item 9.1 - LCG Company Brochure (please see binder pocket) B.) Item 9.2 - LCG Address C.) Item 9.7 - LCG Copy of Licenses D.) Item 9.11 - Similar Completed Projects E.) Item 9.13 - Similar Ongoing Projects F.) Item 9.15 - List of Subcontractors G.) Item 9.16 - Proposed Project Team H.) Item 9.20 - Financial Statement and References Non-Collusion Affidavit............................................................... 11 Public Entities Crimes................................................................ 12 OSHA Standards....................................................................... 13 Equal Opportunity..................................................................... 14 Conflict of Interest..................................................................... 15 Dispute Disclosure Form............................................................ 16 o Anti-Kickback Affidavit.............................................................. 17 Bid Checklist............................................................................. 18 Forms not used at Bid Time........................................................ 19 10 c SR A1A1Collins Avenue Streetscape (From 187th to Wm Lehman Causeway) Sunny Isles Beach, Florida 33160 To: Office of City Clerk City of Sunny Isles Beach Attn: Review Panel 18070 Collins Avenue Sunny Isles Beach, FL 33160 We appreciate the opportunity to introduce our firm to you. Founded in 2001, Link Construction Group is an award-winning local full service general contractor. We excel in out of the ground construction, as well as, Design-Build, Hospitality, Office, Industrial, Institutional, Retail Shopping Centers, demolition and renovations, and related construction as Interior Tenant Improvements. We have the experience, the technology, the resources, and the desire to meet any challenge. At Link Construction Group, we are poised on the threshold of the future, ready to serve your needs. o By consistently completing projects on-time, within budget, and to the highest level of satisfaction we have built a solid reputation. We perform to the same rigorous standards for safety, quality, and client satisfaction on each and every project we build. Additionally, we bring many years of hands-on construction expertise to all of our projects. As your construction services provider, we serve as a staff extension, managing every detail and facilitating the process to meet your needs. The construction process begins by clearly defining your needs. Once these parameters have been established, we then implement our value management procedures that streamline the con- struction method and recommend cost-savings ideas for quality improvements without sacrificing the integrity of the project's construction or completion. Regardless of project size or complexity, our commitment to servicing you is unparalleled. Enclosed within is our executed response signed and notarized and further we acknowledge four (4) Addenda's received. Copies are enclosed and identified with receipt date. We look forward to working with you and your team and welcome the opportunity you afforded us. Thank you for your interest and consideration Guillermo Fernandez, President Enc. o 0'1"'" o SECTION 7 BID RESPONSE SHEET THIS BID IS SUBMmED TO: City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Bid No. 08-10-01 for SR AlA/Collins Avenue Streetscape Improvements The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of Sunny Isles Beach in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 7.1. The Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidder's, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Bidder agrees to sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within ten days after the date of the City's Notice of Award. 7.2. In submitting this Bid, the Bidder represents, as more fully set forth in the Agreement, that: 7.2.1. Bidder has examined copies of all the Bidding Documents and of the following Addenda (receipt of all which is hereby acknowledged.) Addendum No. Addendum No. Addendum No. Addendum No. 1 2 3 4 Dated: December 1. Please see attached Dated: December 1. Please see attached Dated: December 1. Please see attached Dated: December 5. Please see attached 7.2.2. The Bidder has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. 7.2.3. The Bidder has studied carefully all reports and drawings of subsurface conditions and drawings of phYSical conditions. 7.2.4. The Bidder has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies (in addition to or to supplement those referred to in (c) above) which pertain to the subsurface or physical conditions at the site or otherwise may affect the cost, progress, performance, or furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, and no additional examinations, investigations, explorations, tests, reports or similar information or data are or will be required by Bidder for such purposes. 7.2.5. Bidder has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or continuous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, report or similar information or data in respect of said Underground Facilities are or will be required by PAGE 39 OF 130 BID No. OB-10-01 (>-Dj)~[)Ufv1 L.. o City of Sunny Isles Beach Mandatory Pre-Bid Conference - Sign-In Sheet Bid No. 08-10-01 For SR AlA/Collins Avenue Streetscape Improvements 18070 Collins Avenue, lit Floor Meeting Room, Sunny Isles Beach, FL 33160 Monday, December 1,2008; 2:00 p~m. . ~ ; A' ~~ Staff: ~ thE:. .. ~ o'~ <I.f\--o"-. Ckltt4~~~ ~~. O'U"A-1~~. ~,J ~,j'E t A-t,;.,v/ru-z,. ~,J~IJt--e-(Z-~r \ ,.Ie... <blU-- 6\1\Js, fw ~l-z.l ?\~eov(2.. MIW~c..to ~(\.Urz.: ~,.l ~. Guests o Name~..-C~C;; <:::0 ~jh c,. r-D to. CompanyName:~ 5'erVI'c..e So ,.:;r:-,.. (J . Address: CJ 700 j.) u.J 70 tI, IJ. rf. City: I-L; Cc Ik.{ Phone: ryB(P ?1~F7'5 zJ 2- Fax: :; /81 B 2.l/zg. , nd" fonsfvt.hfJr> 1f5 er. State: -=F-L- Zip: ~?>olfo. Email: /l5nttn:iD .p~ f,." se....~ ,E"S . Name: 1u"6 \=': 1(, \,)~2A- f'I1oAJT(.J TitleJ3u~;AJl.6S 'Y"JdtfrAw Company Name: 61.1 A.C2..,e Q.. ItJ.tJu!3 C'A.P.'AJ l ~' lif.~") "S"(l\lI' CJ .t:. Address: Pn 80 ^. :3 S- . 00 9 S City: JII, 'i\- 1'1\ \ State: .r1, Phone: aOS" ta4- 0 ~ ,'-I Fax: ~o5.~3t/'07C{V Email:\cI CJWt~~ . ~. Name: 7';:;",~/(... /~ F;2 vv ,-p Company Name: G C T 1 (.V I (.. n..:>"'" Address:...13o,v f; ( ~-F" r4-~h~ City: ;4ILA-",,,rlJ Pbone: q)~ 'i J.... (.. 3 3 3 7 ~ Fax: fI yt/ 5't 3 3 it'1 Title: lii: S' State:)?L Zip: 3 3 ~u )-:L. '3 Email: G (. \' - Gc... t-f 6kLL cJ ...JTn . 0( o Name: f( J <- K V _ D ;fiz- , Title: 0 wlf/e~ Company Name: 5'#11 'd4f L//J-e FJJr:JltJ~~/;f _. Address: ?:3rZlJtilJ~Sfre~1 City: )1,f/~1 State: ;-:L")I Zip: 33/t~ Phone: 7g? ?~J~1i Fax: "$ f'5'? 'f77 Email: 'I. 47sk if.~- ee. ('J , Co over ) o . o o - d0(J~N c.. Pu..~ ~'(20- lMo.~~ UN J. un ll.eM"-icll ~:; IN~ :J- ~OU CS w l '6 J.. ~ ~R. <LN~i ten-J. +1 e,\ .s 5030 60S \ 91((,. -LfYI '1 J eQUwI-f1. UkA ~ rIIOotl'CLi\ ~''\"'?f -1l}a \O'f ~~k--~~ lI~G \~\O\ 9JJ, q0 ~ . r{\\ (AW\..~ TL ~ l cr I \J. ~. Z~.;: . ~19 ~ '1=. --W-s-. 2-~ ~ . 4\p~-:::' ~b: -T~P10f D -t=(PTop GAT i lI\C- , <U)W\ (VY\.G\A'~) M t.Odlv\ive:c.. to -tillO~Q..(.{\ lV\c. . QA) vV\ \ -:tE"'De'{.. '. lo/a~ -~~ ~9-z.. C c.4t f1'J~ . o Mandatory Pre-Bid Conference - Sign-In Sheet Bid No. 08-10-01 for SR AlA/Collins Avenue StreetBcape Improvements 18070 Collins Avenue, la' Floor Meeting Room, Sunny Isles Beach, FL 33160 Monday, December 1,2008,2:00 p.m. Name: A~ del< f5 It I ( E.-,Lo Company Name: vi, ( ~ . S ~~ Title: C,rl ~o:). ~()>-- u~ (Q ~ (J)~ . State: p(. Zip: $1 ('1 ~ Fax: -;'Ol'"- ior- '{z.."to Email: A(!Itr3J-.Il1e.~~ (/,(~_4J- t+.N't) s c. I'- f ; ..., c.. . City: t.A., Jd" : Address:\}1C)\. ~..,:) l\Q:. 1oJ\... Phone: UI'II . c.. ""'- Name: ~.fe ''4~ 11 ~"kf Company Name: ;;;-~e {J.lVr"z/e-- ])//Vlcr> ..z;.c. Address: 7b (JI A/fv 72 Av/#ZVO City: jlfePU '-7' Phone: <tJ;) 54 Z -'10t1 (, Fax: 5 QJ"- Sru-7 b J"7 , Title: j~ YL~~ State: FL Zip: 3J J 11 f, Email: ~~..z.de.s@ TC/)' 'd ~n? Name: :::DA~ ILL ftzG- L Company Name: Ir N'b Pr. L i:- b VLO V f \ \...L<.. Address: .2..""-0' V vJ , If ~ Av&ity: M I A-M I State: F L Zip: 311;;13-- 3c:15 ~2.1 ") -O)~4 Fax: 305"- 5'GJ ~--)l13E1ail: &tt (j)~";QIt 1 tlO\Jf. Title: --.:P~ . o Phone: ,,"" Name: ~ Gar( k Company Name: e ~.JIh~I..'tU"~ Address: 4- 5,E / 51. Phone: ~05) 79(p -9351 Title: D' . J , lA.f SprVi,e. b~f' . City: ~~rn , State: t=- t. , Fax:CSU.s) (P.J7-(Pioo~ Email: '- ...... Name: 'p , K{d~6"0 Company Name: S:cLo ~~ 1'f.tL>c..n 00 ~Q..p. Address: 3BSs. eoUU~Qt:.. Th~ City: Ul\lM./~/2. Phone: 3Ps q u - 3,\)'~ Fax: 3c=>3 q 44 Oo~ 7 Title: State: 't=\ Zip: "3 2. o~S Email: ~\D~ @So,oLO C>\lJl cnoV. ~ Name: ',No,.., It!> "v tElL!. 'JK Title: A201ti(!.T U~~ Company Name: eo,..c.I\AI1N,rl( A-:.I'~'T Colt.t' Address: l'tfJof ~,.... Ifj l Ad. 6r City: HI""~ State: Ft- Zip: ~;o /9 Email: ..,.wt:t:~(iJ cA<ot.P. JJ~ o Phone: -;or- gZ~-01-66 Fax: ~r-6'2..q - eA--:rZ o o 10 Mandatory Pre-Bid Conference - Sign-In Sheet Bid No. 08-10-01 for SR AlA/Collins Avenue Stteetscape Improvements 18070 Collins Avenue, 1" Floor Meeting Room, Sunny Isles Beach, FL 33160 Monday, December 1, 2008, 2:00 p.m. Title: ~~ Phone: Name: ~q'tJEt t)eo/?O- Title: ~ ,CJWIVL f . , Company Name: H G r fI.-O /1!--r72 (/C 7'1 () (l/ f ,Of'./ Add",,, '7-6'L ':' i-d iEiu J<1.LJIPJg) . ~; n-7,' State, ;::; {, _ Zip, 3 3 ( 2." Phone: (;3~) 4fbl de" 3 Fax:Q~) I 06"OEmail: WE I&Fl5/wd-PJ/J ha.!/stJ(j , /) fl:7 Name: Ju 1:0 C '&A-o..I-a Company Name:-p tl L CtJN,hoc...+ (OW Address: J Y111 SW 42 r.:1V f!.u, t"c. 2o<])City: fr},Om ( Phone: (305) 2.C}- f7-'1'1 Fax: (:?OS) 2oq-1110 Title: (JW/l/Lr State: ~(~ Zip: 33/15"' Email: 3()l'OC.~ fo.....J. t.. ~7 oJ (OM Name: H L C- ~ M I MA~/. 1,..1 'l. Com...y N.m" t/cr '''f'''"' ,..e Address: &(0\ tV 20~~ Phone: :3orBttf t/bdJC; Title: E&re Ie.. City: Lj, L)( t=- D ~ Fax: ~J PI 9422 '"2 State:,cL Zip: "3~ I i Emall: P4 'Jpt'JtJt'.fIJ~I;V{l".dc ~h(, ~ol' Name: j}1t'cIA.aL/';:;; C&fra z, "Ve;) Title: S-ltft('c)I~D r Company Name: ~~-..5q~.55 ~.5c.q~ Address: J,)a) A/', ~ ~ City: r{P/~'~ State: r I Zip: 330 0( I Phone: tf Gt/- "3/ -" /( Fax: 1s-r.{- 'f 33 -lCl~mail: -"; ", e l", ~.5 -~ t.4;~ .s.s. h.oz.. Name: rlO~ a.{'\~ Sons f(\.\.er fr\.~e~, 1(\<.. Company Name:_~llhat.) Yon) Address: ~ 'a 0 ~~ la1l41( A "e~ City: ~""^f\11~J-e1 State: ~ Zip: ]~/6 0 Phone: '3 0 ~ '1 I or C1 b b "1. Fax: 10 s: q I '1 ~ 0 q 6 Emall: P i ()~ (J bQ 1I5u.iP,. f\ e.r Title: rrO)ec\ A'lGl{\4jer o Mandatory Pre-Bid Conference - Sign-In Sheet Bid No. 08-10-01 for SR AlA/Collins Avenue Stteetscape Improvements 18070 Collins Avenue, I"' Floor Meeting Room, Sunny Isles Beach, FL 33160 Monday, December I, 2008, 2:00 p.m. Title: .p /2s2.J" b:..r- ~ Company Name: UN k..-. ~ 5'l)'2-v ~,:; ~ G ~ . . 1 PILiV6 .S"'ulrl!: '2..<e Address: 70D3 ~. lJ-I~ City: HI~\ State: F-L Zip: "3 3 IS.J O~~S <2 Phone: '3or . b c.s . q, ~ 2-G. Fax::!OU . 'G.J" .9 W I Email: L.J~ k.. CO,foJST'/W<..;J\A) 0-1 J-.. J~ (&~5 Name: ,~T o Name: ~ohY)- ~aJ~ ra Title: ~ C......y N..." 1Ld @R---FCalS-frtc~o n . Co. i' r n c- '"' Address: \'2.45'0 NW Swin~lvtRgty:~State:~ZiP:~3/7f Phone: 9Cb. %83Cl<67g- Fax: 3oSfg3q7~ . ed e ~ (, Name: Phone: ?/ Ci~/;)4(bc./(f f A'8 'te: FL Zip:33'S.:s ~ Fax/? ~'&o 71 Email: /1;QI1 @ ~tJey / ' .(~ .~-~. D'l ~ \_j Name: --:1'tTt Title: -1: \.2[") j'Cct-nAN t\ ~e Company Name: I Dc.... :1 (Y\ c. - . I Address: l '2Cf\ 1 1i w ~~ '1t\ AU- City:' i te: I L Zip: 53D I f'~ I Phone?)()~' fjL \.\7.-2.<0 Fax(7()~'8Llo.c:xY4mail:1$l\~Ovtd~PM.Ji It . Net Title: rp /1 Name: .d<o J{ ;p J-:T]\t TPr CO.....YN....Oe~ (cJOJlt,fi. Address:). ~ N tv J & ~ T City: (J)~ pj14lP State: /- t- Zip: 1f 3 ,30 Phone: 9 j1tt -<(60'0/30 Fax: 9.fLt-ft.eC!~Ji/Lnail:rYC//W/JJ'f ~;;Q q -IJoT o Name: vl/ N6~"S Title: ;>Wn..~ City. State: Fax: tlc1ZJl- Ofr/1 Email: 10 o o - Mandatory Pre-Bid Conference - Sign-In Sheet Bid No. 08-10-01 for SR AtA/Collins Avenue Streetscape Improvements 18070 Collins Avenue, 1" Floor Meeting Room, Sunny Isles Beach, FL 33160 Monday, December 1, 2008, 2:00 p.m. Name: L~Q~~6' ~. I/~IOO Title: "f of;, . Company Name: Fwe. DA. ~~ ~~Terf~ I ~ Address: ~ 'OW lO~ ST City: ~ I f\-N I State: F1, ZiP:~ Phone: ~.. ~'2r ~ Fax: ~t.r~Ie~SlJlJt Email: Vql,do.I~L.olre(}r..t fl){!b( dll Name: J-t I~u.t.l 0(,/ e.ir -l rO Title: -W '" !-1O,/?Ci (j'~ La.9 (J Cor? ~-h- tJt:'~+ " "j,-, LO oJ Company Name: V Address: 'f1Q gr-ic:~e'l A....( ~ 100 ~ . State: FL Zip: :-s :Sl 3 ( City: 1-1/ A 1-1 I Phone: 7'16 . 3 'g5 - 0 9 3 V Fax:3os- :5 (f /~ ~ <{l..{ Email: h1. t} ve. rr<. /"D 12.. I'? 9 pC C. '# ~'Cl.. ~'-~ ~ ~ 0 w '. ~ ~ 1: Title: \?r~ ". Name: Company Name: \ FiNE fA. E IN 7 E a.. f (( cs:s ~ I ~ C.- Address: ~ <;' 0 <6 \J>[ \~. c..(. City: fcr- \,D'\~ ~<?"State: ~ L Zip: ~~(62) Phone: ct -s-q - "\ ~ -~\Ol> Fax: q ~ "l~_"Q~all: -\-{~~~ ~({N6''I. C5~1l ttfrt Name: 6 ? f, r-rJ C~Jj~ Title: )~l (l- N ~.--.,~ Q..r Company Name: /2~~/ ~ ",,s I- "--"- L n ~ , r;:. ~ -.J+ l~ . Address: -, "l. ~ S'" N Vv f-!jlt. ~+ City: M',~~; State: t/ Zip: ~:J W;G Phone: ':3 <J y- 7/ B - If 0 '7 <J . Fax: Email: ~ b.b "'; ~ I. C2'J J.~ -fJ r ~o.lV <:...l"'J I- "'-' ~ ./--':I^". c.a~ Name: tthl/ W~tl1' Title: ePt7~-n r1- Company Name:"bevZ/JJf,,(&Ji N'!J 00111-1. 0A-Ouf d- FGJ.~..tM Address: qo:tJ M !~ AI< .110 6 City: ftt'fM..1 State: ::r:<.- Zip: 33 17 (, Phone: ~J - J16- 06 { / Fax: 80-1- J16-0b I~"'" Emall: Ylh)'I~evc{;.[:;)weV\1-fl ( ~ Name: \ L'AP.lD:. M. 6.iL '- M ~l.A ~J, , Title: C-I Nt I pp. L Company Name: AGc) "INC' Address: W'MS NW 4\ 5.,.. City: DOLi'lL State: FL. Zip: ~~ l L~ Pbone:(3()'S\ 592- 1'2. <(3 Fax: (:~ os\ SCi2l ~ , s Ct Lj Email: L.W\aiLe A~ CTf.I:::Ot- ~/.~ ~-, tS'~.1 - /+l)0 ZSrJDvvv, 3 o EXTRA-DUTY RATES Sunny Isles Beach Police Department Effective Date: Apri/1, 2008 Pol ice Officer $48.00 per hour The fee covers the payment to the officers in addition to mandatory cost of workmen's compensation, contributions to the Florida Retirement System, Medicare, social security and other administrative fees. o Police Supervisor $52.00 per hour 3 or more officers require a supervisor or designated supervisor. The fee covers the payment to the officers in addition to mandatory cost of workmen's compensation, contributions to the Florida Retirement System, Medicare, social security and other administrative fees. Any Extra Duty details that fall on a city observed holiday will be billed at the rate of $72.00 per hour. The following is a list of the observed holidays. c New Years Day Martin Luther King's Birthday Presidents Day Memorial Day Independence Day Labor Day Veterans Day Thanksgiving Day Day after Thanksgiving Christmas Day - 10 I I I I All requests for Extra-Duty Officers must be in writing and FAXED to 305-792-1583, not less then seven working days before the event. Please note requests I cancellations for Extra Duty officers are only accepted Monday through Friday from 0700-1530 hrs. A Cancellation fee of 3 hours will be charged on all jobs not cancelled 8 hours prior to the start time of the detail. There is a 3 hour minimum on all details. o Payment Terms: For single day details, payments must be paid in advance for the entire detail term. Payments must be in form of: Personal/Certified / Cashiers Check or Money Order. All payments should be received at least 5 days in advance unless other arrangements are agreed upon. ALL CHECKS SHOULD BE PAYABLE TO: The City of Sunny Isles Beach All jobs will be assigned an invoice number by the extra-duty coordinator and the invoice number should be noted on the check upon making payment to assure accurate accounting. Any questions please contact Sandra Block 305-792-1839 sblock@sibfl.net o o Addendum NO.4 CITY OF SUNNY ISLES BEACH Collins Avenue Streetscape CITY BID NO. 08-10-01 Bidders are required to acknowledge receipt of the ADDENDUM on Page 39, Section 7 of the Bid Specifications. Failure to do so may cause the bid to be considered non- responsive and subject to rejection. Please take notice of the following revisions, clarifications or additional information on the above referenced project. o 1. Lighting Plans: Sheet L-13 (Lighting Details) is revised to include the following: The metal light poles shall include a frangible coupling inside the pole base. 2. Bid Form Section 7.6 - The Unit Price is to include all labor, taxes, overhead and profit for each Bid Item. 3. Landscape Plans: Sheet LD-5 (Plant Schedule): The quantity of Phoenix dactylifera 'Medjool' Date Palm should be revised to read (35). 4. Bid Opening date and time remain the same: Mondav. December 8. 2008 at 11 :30 a.m. END OF SECTION o o o o - 4~~ ::;Y-;~'~0... ~'" <'~'~""="":'~"~.J :\ /~..~~h . ~~';~ 1-' ":'1 :". I --- I' I, I~ . II" I '.......\... /:./ . J ~'~~ _". .IY.%.' :\....}J~.__.~.;-, . ......~.. ;"i-I-.j....~ ..""'-" C., ----- to":,.... ,. V" ~.o r- Answers to Questions Submitted after Pre-Bid Conference Question from Arazoza Brothers, Corp.: 1. I was reviewing the quantities on the bid schedule versus the plans and found a difference in quantity for the Phoenix roebelinii (Pygmy Date Palm). The bid schedule calls for 20 and the plans show a quantity of 35. Will a new bid schedule be issued or would you like us to just cross it off and correct it? Thank you for your time and have a great day. There are (20) Phoenix roebelinii on the Bid Schedule as well as the plan. We do not see the discrepancy. We noticed a typo on one of the plan sheets and have added Item #3 to the Addendum (see pg. 1 of this document). Questions from Vila and Son: 1. Page L-4 Is it necessary to concrete encase boxes that are in grass area what is the dimension of concrete collar? Page L-4, the concrete slab is 5'-0" x 5'-0", per FDOT Standard Index 17500, sheet 2. 2. Page L-16 Are we using spread foundation as shown on our project / all poles are in grass covered areas? Page L-16, all proposed poles have a spread foundation per sheet L-16. The poles are located in the proposed sidewalk. 3. L-5 Note is requiring to remove existing pole. Do we do anything with concrete pole base? Page L-5, the base as well as all salvageable materials are to be delivered to Miami-Dade County Traffic Signals and Signs Division, per general note 9 in sheet L-3. Note that Pay Item 715-4-600, Light Pole Complete (Remove), refers also to the concrete foundation that is to be removed and disposed of properly for all the existing poles removed. o 4. L-17 There is not one line diagram for PNL-B it is not clear what is controlling lighting contractors and Manual Disconnect is specified as 100A Circuit breaker and Heavy duty Disconnect. Could we use any of these options for Disconnect? Page L-17, a diagram for the panel will be provided in a plan revision. For bidding purposes, the circuit breaker needs to be rated for 100 amps. Question from VallevCrest Landscapina Development: 1. RFI clarifying if item # 715-11-119 requires a concrete foundation, I would appreciate it. The pay item note for this item at states "Includes the fixture, luminaire, lamp, ground spike, mounting, foundation and any other material necessary for a finalized installation." Although it states "foundation" there is no detail of any foundation associated with this item. Typically foundation means concrete, but I haven't seen any concrete detail. The decorative light specs do not show a concrete foundation, and it is not needed. Sheet LD-24 shows gravel to be placed around in-ground light fixture. Install per manufacturer's instructions. o 2. Is the company that is presenting a bid required to be verified on the State of Florida website and to be listed as a Company General Contractor, or can individual GC's bid on the project? https://www.mvfloridalicense.com/wI11.asp?mode=1 &SID=&brd=&tvp= The company submitting the bid must be registered in the State of Florida as a General Contractor. Question from JAG Liahtina Solutions. Inc.: 1. Can you tell me what manufacturer of street light poles and fixtures you are using for this project? Per sheet L-13 of the lighting plans, the pole manufacturer is Spring City Electrical or approved equal. The fixtures are Lumec, model RN20. o 53 580-1-2 Phoenix roebelinii (Pygmy Date Palm) EA 20 $215.62 $4,312.35 0 54 580-1-2 Thrimax radiata (Florida Thatch Palm) EA 19 $349.65 $6,643.35 55 580-1-2 Relocate (3) exisitng Coconut Palms & (3) EA 6 $460.37 $2,762.24 Cabbage Palms 56 580-1-2 Existing tree/shrub removal LS 1 $6,993.00 $6,993.00 57 580-1-2 Fertizlie existing Royal and Foxtail Palms EA 67 $13.99 $937.06 Subtotal of Landscape Complete (Large) $385,933.181 Landscape Compelte (Small) 58 580-1-1 Chrysobalanus icaco 'Red Tip' (Cocoplum) EA 20 $10.49 $209.79 59 580-1-1 Conocarpus erectus 'Sericeus', (Silver EA 8 $10.49 $83.92 Buttonwood) 60 580-1-1 Codiaeum variegatum (Croton) EA 80 $11.66 . $932.40 61 580-1-1 Duranta 'Gold Mound' (Gold Mound Duranta) EA 1294 $11.07 $14,327.49 0 62 580-1-1 Ficus microcarpa 'Green Island' (Green EA 2119 $8.25 $17,482.50 Island Ficus) 63 580-1-1 Ficus pumila (Creeping Fig) EA 10 $3.85 $38.46 64 580-1-1 Euphorbia milii 'Rosy" (Dwarf Crown of EA 132 $11.66 $1,538.46 Thorns) 65 580-1-1 Dianella tasmanica (Blueberry Flaxlily) EA 792 $8.98 $7,109.55 66 580-1-1 Hamelia patens 'Compacta' (Dwarf Firebush) EA 125 $10.49 $1,311.19 67 580-1-1 Ixora 'Nora Grant' (Pink Ixora) EA 40 $10.49 $419.58 68 580-1-1 Schefflera Arboricola 'Trinette' (Dwarf EA 72 $10.49 $755.24 Schefflera) 69 580-1-1 Tradescantia pallida 'Purpurea' (Purple EA 1500 $3.79 $5,681.81 Queen) 70 580-1-1 Tripsacum f10ridana (Dwarf Fakahatchee EA 890 $6.94 $6,177.15 Grass) Subtotal of Landscape Complete (Small) $56,067.54 0 71 590-70 Iriigation Complete (SR A1A/Collins Avenue LS 1 $47,644.47 $47,644.47 between 187th St. & Wm Island Blvd.) PAGE 44 OF 130 BID NO, 08-10-01 72 590-70 Irrigation Complete (Intersection of SR A1A1Collins Avenue & Sunny Isles Blvd.) Architectural Pavers on 1 1/2" sand bed including 6" cone. Band. Subtotal of 0600 Landcape LS 1 $8,504.65 $8,504.65 o 73 526-1-2 SY 1645 $68.74 $113,075.64 $442,000.721 IV. Contingency Allowance LS 1 $100,000.00 $100,000.00 TOTAL BASE BID (Items I thru IV) $1,256,469.711 IGRAND TOTAL $1,256,469.71 NOTE: The quantites shown in this bid form are estimates only! They may vary significantly from the actual quantites. Payments wi! be made on the basis of actual quantites placed and accepted by the City. The Bidder, by signing this Bid Form and Contract, fully acknowledges that he/she wil receive no additional . compensation (no overhead, no anticpated profits, etc.) other than the bid unit price of the items times the number of items authrozied, ordered, placed and accepted by the City. Grand Total (based on the estimated quantites) written out in words: 01Jt: k two..J ,r(./'Jo /-'1/.,A.itJlLr1!:i nl71St,.)( {HDurA...J.D" fCVfL W,..i>z.M Dollars and ~lNlt1 oNf.. fIx 'Nt ~ J rvC: DOCUMENT CONTINUES ON NEXT PAGE Cents. o o PAGE 45 OF 130 BID NO, 08-10'{)1 o SUBMITTED THIS 8 DAY OF December .20 08 If BIDDER is: AN INDMDUAl By (SEAL) (Individual's Name) Doing business as : Business address Phone No Facsimile No If BIDDER is: A PARTNERSHIP ~ ~~ (Firm's Name) General Partner Business address Phone No Facsimile No If BIDDER is: A CORPORATION o Title Business address Link Const.rlll'tinn ~rnllp (Corporatjon's Name) State of Incorporation: Florlda Representative Guillermo Fernandez (Name of person Authorized to Sign) Presldent 7003 N. Waterway Drive Miami. FL 311t;t; 305-665-98?6 ~9851 Attest: ----= By Suite 218 Phone No Facsimile No (Corporate Seal} If BIDDER is: A JOINT VENTURE (Name) (Address) (Name) (Address) (Each joint venture must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.) o PAGE 46 OF 130 BID No. 08-10-01 IN/A I o CERTIFICATE OF AUTHORITY (IF JOINT VENTURE) STATE OF COUNlY OF I HEREBY CERTIFY that a meeting of the Principals of the , held on December a corporation existing under the laws of the State of 20---, the following resolution was duly passed and adopted: "RESOLVED, that, as of the Joint Venture be and is hereby authorized to execute the Bid dated, 20---, to the Oty of Sunny Isles Beach official act and deed of this Joint Venture." 10 I I further certify that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand this , day of 20_. Secretary: (SEAL) END OF SECTION o PAGE'l9 OF 130 BID No. OS-10-01 THE AMERICAN INSTITUTE OF ARCHITECTS Q AIA Document A310 BID BOND . KNOW ALL MEN BY THESE PRESENTS, thaI we ~d ~~/~/V ~t7~ ~ as Principal, hereinafter called the Principal, and Harif'ord Fire Insurance Company a corporation duly organized under the laws of the State of Connecticut as Surety, hereinafter called the Surety, are held and firmly bound unto The City of Sunny Isles Beach as Obligee, hereinafter called the Obligee, in the sum of Five Percent of Amount Bid Dollars (5%) for the payment of which sum well and truly to be made, the said Principal and the Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for SR AlA/Collins Avenue Streetscape Improvements; Project No. 08-10-01 NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good 1'\ and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the .., prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 8th day of December, 2008. ~~ -- (Witness) Inc. (3e(l1) (Title) D.~ Charles D. Nielson, Attorney-in-Fact and Florida Resident Agent o .,,.,,,. =...-.... "',,_ '""~". __ ""I ., """" . "''''' "_,,.... _ . .;, ",,"m,", =,,= _, ",.. _""" '" NA _, "''' Bid Bond - AlA, February 1970 ED - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW., WASHINGTON, D. C. 20006. Direct Inquiries/Claims to: POWER OF ATTORNEY POBO:~,~P~~~~~:~ENUE HARTFORD, CONNECTICUT 06115 call: 888-266-3488 or fax: 860-757-5835 C<NOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 21-229752 []:=J Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut []:=J Hartford Casualty Insurance Company, a corporation duly organized under the Jaws of the State of Indiana []:=J Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut C=:J Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut C=:J Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana C=:J Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois C=:J Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana C=:J Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited: Charles J. Nielson, Mary C. Aceves, Warren Alter, Charles D. Nielson, Joseph Penichet Nielson, David R. Hoover of Miami, FL their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by [8], and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on January 22, 2004 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. l!ii''if:..~ ~... ..~ ~."..'\ ,~. I;!t,..".....'~~ ;J~ f;~"':_...~9);f l;;~. ~i;i.~ . \~.~..,t97~p \~t\lll7?fJ.,~- '} 19'. \.,.......~..' ~~, '~ '('/ 'lUtQl'\ '..ta.t11 ~.:.~. '0 I f~O Ct. ~ ~r2-- Paul A. Bergenholtz, Assistant Secretary M. Ross Fisher, Assistant Vice President STATE OF CONNECTICUT} 55. Hartford COUNlY OF HARTFORD On this 1st day of February, 2004, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. Scott E, Paseka Notary Public CERTIFICATE My Commission Expires October 31,2012 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of December 8, 2008. Signed and sealed at the City of Hartford. :;J neAr? A o fu0#;;::f--- Gary W. Stumper, Assistant Vice President }f o NIELSON, ALTER & ASSOCIATES NIELSON 8< CoMPANY, INC. THERE IS A DIFFERENCE... December 5, 2008 The City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RE: Link Construction Group. Inc. SRA1A/CoUins Avenue Streetscape (from 18~ Street to William Lehman Causeway); ITB No. 08-10-01 Gentlemen: o Please be advised that we are the bonding agents for Link Construction Group, Ine. We have had the privilege of providing Bid, Performance and Payment Bonds for them since 2001. Link Construction Group, Inc. is bonded through Hartford Fire Insurance Company and has a substantial bond line of credit of $30,000,000 for single projects and an aggregate bond line of $60,000,000. Link Construction Group has successfully completed all of their projects that we have bonded in a very satisfactory and professional manner and have never received any issues from the owners, subcontractors or suppliers and they have an excellent reputation in the construction industry. We are very confident of their integrity and abilities and once again, would extend our utmost recommendation on their behalf. We consider them to be among our finest clients and hold them in the highest regard. Naturally, any bonds that are issued will be based upon acceptable contract terms as well as normal and standard underwriting criteria at the time of request If we can provide any other assurance or assistance, please feel free to give us a call. Thank you. . Very truly yours, ~O~ Charles D. Nielson, Attorney-in-Fact CDN:glm Q PROVIDING BONDS FOR THE CONSTRUCTION INDUSTRY 8000 GOVERNORS SQUARE BLVD. . SUITE 101 . MIAMI LAKES, FL 33016' DADE: 1800-557-2663 (BOND) PHONE: (305) 722-2663 (BOND) . FAX: (305) 558-9650 WWW.NIELSONBONDS.COM CI f , , f i ! I f i I I i ! i i I I I 1 i t ! I I I I I I I f ! I ! i , , f I i I ! i See attached Bid Bond I Q SECTION 8 BID BOND STATE OF FLORIDA ) ) COUNTY OF ) KNOW ALL MEN BY THESE PRESENTS, that we, as Principal, and . as Surety, are held and firmly bound unto the City of Sunny Isles Beach, a municipal corporation of the State of Aorida in the sum of Dollars ($ 1, lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these presents. THE CONDmON OF THIS OBUGATION IS SUCH that whereas the Principal has submitted the accompanying Bid dated, 2008 for: o WHEREAS, it was a condition precedent to the submission of said Bid that a cashier's check or Bid Bond in the amount of five percent (5%) of the Base Bid be submitted with said Bid as a guarantee that the Bidder would, if awarded the Contract, enter into a written Contract with the City for the performance of said Contract, within ten (10) consecutive calendar days after written notice having been given of the Award of the Contract. NOW, THEREFORE, the conditions of this obligation are such that if the Principal within ten (10) consecutive calendar days after written notice of such acceptance, enters into a written Contract with the City of Sunny Isles Beach and furnishes the Performance and Payment Bonds, satisfactory to the City, each in an amount equal to one hundred percent (100%) of the Contract Price, and provides all required Certificates of Insurance, then this obligation shall be void; otherwise the sum herein stated shall be due and payable to the City of Sunny Isles Beach and the Surety herein agrees to pay said sum immediately, upon demand of the Oty, in good and lawful money of the United States of America, as liquidated damages for failure thereof of said Principal. IN WITNESS WHEREOF, the above bonded parties have executed this instrument under their several seals this day of .20 . the name and the corporate seal of each corporate party being hereto affIXed and these presents being duly signed by its undersigned representative. DOCUMENT CONTINUES ON NEXT PAGE PAGE 50 OF 130 BID No. 08-10-01 I Please see attached Bid Bond I . IN PRESENCE OF: Individual or Partnership Principal Affix Corporate Seal Business Address City, State, and Zip Code Business Telephone Business Facsimile ATTEST: Secretary (Corporate Surety)* o By: *Impress Corporate Seal IMPORTANT Surety companies executing bonds must appear on the Treasury Department's most current list (circular 570 as amended) and be authorized to transact business in the State of Florida. END OF SEmON PAGE 51 OF 130 BID No. 08-10-01 ACORQ.. CERTIFICATE OF LIABILITY INSURANCE T DATE (MM'DDNYYY) 12/05/2008 PRODUCER (305) 822-7800 FAX THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Collinsworth, Alter, Fowler, Dowling & French ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P. O. Box 9315 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. r Miami Lakes, FL 33014-9315 ) . INSURERS AFFORDING COVERAGE NAIC# - INSURED Link Construction Group, Inc. INSURER A: Amerisure Mutual Ins Co 23396 7003 N. Waterway Drive INSURER B: Amerisure Insurance Co 19488 Ste. 218 INSURER C: Zurich (American Guarantee & Lia ) Miami, FL 33155 INSURER D: INSURER E: COVERAGES c THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. Ilfl.f~ r.,'?,~~ TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE ~~!9~Y EXPIRATION LIMITS GENERAL LIABILITY Gl2031180 08/08/2008 08/08/2009 EACH OCCURRENCE $ 1,000,000 ~ LANKET ADDITIONAL INSD X COMMERCIAL GENERAL lIABllIT'8 DAMAGE TO RENTE~___, $ 300,000 I CLAIMS MADE [K] occult ~ REQUIRED BY CONTRACT MED EXP (Anyone person) $ 10,OO( A X XCU NOT EXCl PER ENDT CG7049 PERSONAL & ADV INJURY $ l,OOO,OO( ~ X CONTRACTUAL lIAB BLANKET WAIVER OF GENERAL AGGREGATE $ 2,OOO,OO( ~ 2,OOO,OOC GEN'L AGGREGATE LIMIT APPLIES PER: SUBROGATION PER ENDT PRODUCTS. COMP/OP AGG $ h POLICY m jffi n LOC CG7048 AUTOMOBILE LIABILITY CA2047609 08/08/2008 08/08/2009 COMBINED SINGLE LIMIT ~ $ X ANY AUTO (Ea accident) l,OOO,OOC - ALL OWNED AUTOS BLANKET ADDITIONAL BODILY INJURY - $ SCHEDULED AUTOS INSD AS REQUIRED BY (Per person) B - X HIRED AUTOS CONTRACT PER ENDT BODILY INJURY - $ ~ NON,OWNED AUTOS CA71151204 (Per accident) - PROPERTY DAMAGE $ (Per accident) ) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ R ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY AUC9672553-00 08/08/2008 08/08/2009 EACH OCCURRENCE $ 4,OOO,OOC tKJ OCCUR D CLAIMS MADE AGGREGATE $ C FOllOW-FORM $ 4,OOO,OO(] R DEDUCTIBLE $ RETENTION $ $ WORKERS COMPENSATION AND WC2031181 08/08/2008 08/08/2009 X I T'1,~~T~J,~;, I lOJ~' EMPLOYERS' LIABILITY BLANKET WAIVER OF l,OOO,OO(] B ANY PROPRIETORIPARTNERIEXECUTIVE EL EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? SUBROGATION PER ENDT EL DISEASE. EA EMPLOYEE $ l,OOO,OO(] If yes, describe under WCOO03B l,OOO,OO(J SPECIAL PROVISIONS below EL DISEASE, POLICY LIMIT $ OTHE;R 08/08/2008 08/08/2009 $75,000 limit Buslness Personal A Property - Special CF2031179 Ded- $1,000 AOP/5% Wind & Hail Form R~ESCRIP1l0N OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS e: SR AlA/Collins Avenue Streetscape (from 187th Street to William Lehman Causeway) TB No. 08-10-01 ity of Sunny Isles Beach shall be named additional insured when project is awarded. o City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Fl 33160 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAlL -1L DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE i1rl.' J ,~) Ti //1 Michae 1 Ni e 1 son/ROSIEG - tiVW"'...A\,v'-/y--IJ\.;_'\.....{.ll'1A @ACORDCORPORATION 1988 ACORD 25 (2001/08) (> IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. c () ACORD 25 (2001/08) G con!itruction group 3899491 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION CONSTRUC.!ION nwUSTRY LICENSING BOARD SEQ# 1.08080701860 . t . L1 NSE'.ltBR 08 07 2008 088025837 CGC059120 The GENERAL CONTRACTOR Named below IS CERTIFIED : Under the provisions of Chapt.r 489 FS. Expiration date: AUG 31, 2010 CERRA, MIGUEL ANGEL . LrNK CONSTRUCTION GROUP 7003 N WATERWAY DR APT 218-- M~I FL 33155 :; ; ,. CHARLES W. DRAGO SECRBTARY CRARLU: CRiST GOVERNOR ,/,i i". DISPLAY AS:REOUIRED BY LAW tIl~"'- Af.I 3 902 3 2 9 STATE OF FLORIDA DEPARTMENT OF BUSINESS'AND PROFESSIONAL REGULATION CONSTRUCT;tON- INDUSTRY LICENSING BOARD SEQ# L080B0801729 : . LICENSE. ~NBR ~ G 489 FS. l'lt FERNANDEZ GUILLERMO '.- LINK CONSTRUCTION GROUP INC 7003 NORTH WATERWAY DR '218 SUITE 218 MIAMI PI" 33155 r ClIARLIE CRIST GOVERNOR -.' CHARLES W. DRAGO SECRETARY " DISPLAY AS REQUIRED BY LAW AC#3331786 STATE OF FLORIDA ~ DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION .' CONSTRUCT:ION :INDUSTRY L:ICBNSING BOARD SEQ'11070eO'003?O - - .. . . _~!CBNSE NBR 108/09/2007 IOOOQOOOQO JOBO019839 The BUSrNESS ORGANIZATION Named below IS QUALIFIED Underth. provisionSJ of Chapter' 489 PS. Expiration datel AUG 31, 2009 (THIS IS HOT A LICENSE TO PERPORM WORK. THIS ALLOWS ~MPANYTO DO BUSINESS ONLY IF :IT'.HAS A QUALIFIER.) .LINK CONSTRUCTION GROUP INC 7003 N WATERWAY DR STE :nO MIAMI - FL 33iss CHARLIE CRIST GOVERNOR DISPLAY AS REQUIRED BY LAW HOI..I..Y BENSON SECRETARY o MrAMI-OADE COUNTY TA~ COLLECTOR t 40 W. Fl.AGLER ST_ ,..thl;F\,QOR MI~I, FL 33130 200e L~'~~_TU~ 200$ MIA'''I.QA.pE~ . _ - !N'AliLBF. FlltlbfttDA :SFlIR[$l T.-'O ~ MOST B.E Ot$Pu,YEO:AT ~Liti Of "\I~"~ PURSU"NTTO clXiNTv CODE"C'AAIS'n:R 8A. ART. 9 & 10 - THIS IS NOT A.BILl-DO NOT PAY RENEWAL 480167-4 STATtfc~6CWS9120 218 ARST-CLASS u.s. POSTAGE PAtD MIAMI. FL PERMIT NO. 231 460498-0 8l'~~W ~S'flfift'fl~ON GROUP 7003 H WATERWAY DR 33155 UNIN DADE COUNTY tHC owr~K CONSTRUCTION GROUP IHC ~~rfltH~rtAl BUILDING CONTRACTOR WORKER/S 4 c '"ISIS ONLY A lOCAL Il!U$IIiESST41: RE.C:"I'T.JT DOl. NOT "fRUIT THE HOLDERTO V10LAn' ANY ~rIHB Of! AtGla.&70RY OR lON...a LAW$ OF THIi eoUXTY OR elTlU. NOR IDOESIT IXEM'" THII HOUlER .1lOII ~ OflleJI "fR IUT 0/1 Rlcr; 'I'T JIl!QUIRED 8'1' lAW- nus IS HOT A CEAJ"lCAnON OF- 1'H~ tICllDOR'$ OUI\UP1CA' ~. DO NOT FORWARD LINK CONSTRUCTION GROUP INC GUILLERMO FERNANDEZ PRES 7003 N WATERWAY DR STE .218 MIAMI Fl 33155 ""unHT R~I'IEO IiIIAM..w.DE COlJIfT'Y TAx COU 1CTtlRO 711 5/2008 I 60120000064 000075.00 j 111'1111/1111"1'.' 111.1, III,' j 11',1 ,i 1.1111 h r 1111, , It.l ~O o o > , " FORM NO 401.2801AC25-061 RV2OOB35367 (Rev 3108) Board of County Commissioners, Broward County, Florida BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT FOR PERIOD OCTOBER 1, 2008 THRU SEPTEMBER 30, 2009 PENALTIES IF PAID OCT. . 10% I NOV. . 15% . DEC. . 20% . After DEC. 31 . 25% . Plus Tax CollectIon Fee of up \0 $25,00 Based on Cost of Business Tax if Paid On or After November 30 , j :J RENEWAL Q TRANSFER TAX BACK TAX PENALTY T.C. FEE TRANSFER '. ." . i'l' SEe # o NEW DATE BUSINESS OPENED STATE OR COUNTY CERTIREG # BUllne.. Location Address: . ! ("j "., ., , .. . I r TOTAL ACCOUNT NUMBER :-:r ... ... ( i' ?-, I'll. ;:. 't.. :: ;' ..r;.,. r .(q I',:, '1 c _" ..- C' ~: 1::- ~'. THIS RECEIPT MUST BE CONSPICUOUSLY DISPLAYED TO PUBLIC VIEW AT THE LOCATION ADDRESS ABOVE. :. f. ;1. ,- I~''.:''! PUCTI')N t 1,1~\ r- i:. "'.-: ...... I t I;;:;:;:: ::. ,',tt-, '.'1. 7~H., t' ";. I n.:';, I i. j.' 1 J .J, ' . L '. " ._ _.. ;7. __ ,- r~ ;:~ -- C'".:. -.:.:.. :. -- ~;~~ " -, .1 ..... t '" , ~ .-l ::: ........ ~ -~, I ..;:. r: '::' B~WARD L- % COUNTY ---.-.----... t r: r- i ~ l · '0" I.: , I' I ~ f;' -:: 1 !., ,- ~ . Ih. ~ ;'; ~~ TYPE OF BUSINESS TAX PAID t: BROWARD COUNTY REVENUE COLLECTION 1155, Andrews Avenue, Rm A.100 FORT LAUDERDALE. FL 33301 www.broward.org/revenue 2008 · 2009 PAYMENT RECEIVED AS VALIDATED ABOVE 'SEE INSTRUCTIONS ON REVERSE SIDE ", If , i ------- - o SECTION 9 BIDDER QUALIFICATION STATEMENT The Bidder's response to this questionnaire will be utilized as part of the Oty's overall Bid Evaluation and Contractor selection. The undersigned guarantees, by signature, the truth and accuracy of all statements and the answers contained herein. 9.1. Please describe your company in detail, and submit company brochure, if applicable. Please see tab Item 9.1-LCG Company Brochure 9.2. The address of the principal place of business is: Please see tab item 9.2-LCG Address (Map Showing LCG, City and Streetscape Location) 9.3. Company telephone number: 305-665-9826 Q 9.4. Number of full time employees: 38 9.5. Number of employees assigned to this project: 5 9.6. Company's Identification Number(s) for the Internal Revenue Service: 651103903 9.7. Miami-Dade County and Oty of Sunny Isles Beach Occupational License Number(s): Please see attached Miami Dade County License,tab Item 9.7-Licences City of Sunny Isles Beach Occupational License to be provided upon award. HOw many years has your organization been in business? 9.8. 7 1/2 q,CC ~ What similar engagements is your company presently working on? If none, write "none". Please see tab item 9.13-Similar Ongoing Projects o PAGE 52 OF 130 BID No. 08-10-01 - o 9.10. Have you ever failed to complete any work awarded to you? If so, where and why? No 9.11. Number of similar Projects with a contract price of $1,000,000.00: a. In the past 5 years Please see tab Item 9.11-Similar Completed Projects On Schedule Original contract price overrun average % b. In the past 10 years On Schedule Original contract price overrun average % 9.12. Ust last (3) completed Projects with a contract price in excess of $1,000,000.00. PROJECT 1: Project Name/Location Please see tab Item 9.11 Similar Completed Projects Owner Name Contact Person{relephone No. Original Contract Completion lime (Days) Original Contract Completion Date Actual Contract Completion Date Original Contract Price Actual Contract Price PROJECT 2: Project Name/Location Please see tab Item 9.11 Similar Completed Projects Owner Name Contact Person{relephone No. Original Contract Completion lime (Days) Original Contract Completion Date Actual Contract Completion Date Original Contract Price Actual Contract Price PAGE 53 OF 130 BID No. 06-10-01 c PROJECT 3: Project Name/Location Please see tab Item 9.11 Similar Completed Projects Owner Name Contact Person{felephone No. Original Contract Completion Time (Days) Original Contract Completion Date Actual Contract Completion Date Original Contract Price Actual Contract Price 9.13 List the following information concerning all contracts in progress as of the date of submission of this Bid in excess of $300,000. (In case of joint venture, list the information for all joint ventures.) If none, write "none". G Total Contracted Percentage Project Owner Contract Date of of Name Value Completion Completion (to date) Please see Item 9 13-0ngoing P ojects 9.14. Has the Bidder or his/her representative inspected the project site; and does the Bidder have a complete plan for its performance? Yes, Manny Fernandez, Link Construction Group, Chief Estimator, visited the site along with the Project Manager and we have a complete plan of execution. 9.15. Will you Sub-Contract any part of thIS work? Yes. If so, give details including a list of each Sub-Contractor that will perform work and the work that will be performed by each Sub-Contractor. c PAGE 54 Of 130 BID No. 08-10-01 - o Classification of Work Name and Address of Sub-Contractor Please SE e tab Item 9.15-List of Sub-Contractors If, prior to Notice of the Award, the City or the Consultant has reasonable objection to and refuses to accept any Supplier, person or organization listed, the Bidder may, prior to Notice of Award, submit an acceptable substitute without an increase in their bid price. o 9.16. Attach the following information to the Bid: Please see tab item 9.16-Proposed Project Team (organizational chart and resumes) 9.16.1 9.16.2 9.16.3 Contractor's home office Organization Chart Contractor's proposed Organization Chart Resumes of proposed key project personnel, including on-site superintendent 9.17. List and/or describe any: 9.17.1 Current status of all licenses: Please see tab item 9.7-Copy of Licenses 9.17.2 Any disdpline taken against licenses: N/A 9.17.3 Any instances where company has been investigated or discipline by the Occupational Safety and Health Administration (OSHA): N/A 9.17.4 Complaints filed against the National Labor Review Board (NLRB) or the Equal Employment Opportunities Commission (EEOC): N/A PAGE 55 OF 130 8m No. 08-10-01 o 9.17.5 Suspension of contracts or debarring from bidding by any public agency brought against the Bidder in the last (5) years: N/A 9.18. State the true, exact, correct and complete name of the partnership, corporation or trade name under which you do business and the address of the place of business. (If a corporation, state the name of the president and secretary. If a partnership, state the names of all partners. If a trade name, state the names of the individuals who do business under the trade name.) Please see tab item 9.2 for address 9.18.1. Correct name of the Bidders is: Link Construction Group 9.18.2. The business is a (Sole Proprietorship) (Partnership) (Corporation). Corporation o 9.18.3. The names of the corporate officers, or partners, or individuals doing business under a trade name, are as follows: Guillermo Fernandez, President Miguel Cerra, Vice President 9.18.4. List all organizations which were predecessors to Bidder or in which the principals or officers of the Bidder were principals or officers. If none, write "none". N/A 9.19. List and describe all bankruptcy petitions (voluntary or involuntary) which have been filed by or against the Bidder, its parent or subsidiaries or predecessor organizations during the past five (5) years. Include in the description the disposition of each petition. If none, write "none". N/A 9.20. List and describe all successful Bid, Performance or Payment Bond claims made to your surety(ies) during the last three (3) years. The list and descriptions should include claims against the bond of the Bidder and its predecessor organization(s). If none, write "none". ~(Ik- p~S&C; ~ 1Tb1 '1 (1-0 W^- n~ukL..s~, ~ ~ 9.21. List all claims, arbitrations, administrative hearings and lawsuits brought by or against the Bidder or its predecessor organization(s) during the last three (3) years. The list shall include all case names; case, arbitration or hearing identification numbers; the name of the project. If none, write "none". N/A PAGE 56 OF 130 BID No, 08-10-01 o DOCUMENT CONTINUES ON NEXT PAGE Dated this 8th day of December .2007. ~ Guillermo Fernandez Print Name President Title The foregoin..,g instrument was acknowledged before me this ~ day of December 20~ by tf:?(.)/~ ~(}--....Or:,{ - c N~~Y PUBLIC-STATE OF FLORIDA ~'W'';. Orlando Ceballos Jr. \. J Co~mission # DD70841i "........... ExpIres: OCT. 07, 2011 BONDED THRU ATLANTIC BONDING CO., INe, ~ (AFFIX NOTARY STAMP HERE) Notary Public - State of Florida D~~ ~-A-c-~f Print or Type Commissioned Name Personally Known ~ OR Produced Identification ; Type of Identification Produced END OF SEmON PAGE S7 OF 130 BID No. OB-l0-0l . Link Construction Group 7003 N. Waterway Drive Suite #218 Miami, FL 33155 o ~ ~J- ~L ... - '-r.'''-''--''- I, I ~, ! o [ ~ i " ~ .. .... Sf )> '" " J "'v ~ - ~ Q Atlantic 0' IUtl ;~ .' ( construction group STATE OF FLORIDA ... DEPARTMENT OP BUSDR&SS AND PROPESSIONAL REGULATION CONST~UCpON nmUSTRY LICENSING BOARD SEQ# ~oeOI!10701860 _I11CSNSJt."NBR: J / fOB/011200eloBB025837 ICGCDS9l:2.0. The GENERAL CONTRACTOR .. Named beloy 1:9 CER.Tn'IED : unde~ the provisions of Cb&pt~r 489 PS. Bxpi~ation date: AUG 31, 2010 3899491 CERRA MIGUEL ANGEL . L1NK ~ONSTRUCTZON GROUP ~ 7003 N WATEJU4AY DR APT 218. ' M~ FL 33155 CHARLIS CRIST GOV&1lNOR :OIsPt.AY.AS,REQUIREO BY LAW CHARLES W. DRAGO SECIlB"l'ARY ,_! ~ _. ..._11Ioo_ c pt" :3 90232'9 STATE OF FLORIDA DEPARTMENT OP BU$lNESS AND PROP'J!!SSIONAL REGULATION CoNSTROCTION INDUSTRY LICENSING BOARD SEQ# L080BOl!101 Tat _LICENSE'.Na~':' ' I [08/08/2008 I08802S8()4,Jcoco59s65 . The GENJtRAL CONTRACTOR ~ H&J:l\ed below IS CERTIFlED Under the provi.1ons of Chapter ~B9 FS. ~iration dat~: AUG 31. 2010 1 . . , I,ll r~~~'b~~~~~OUPJ:NC 7003 NORTH WATERWAY DR '218" SU.ITE 218 MIAMI PL 33155 CHA.RL IB ClU:ST aOV:BRNOR CHAJU,ES W. DllAGO SECRE"l'ARY OISPLAY AS REQUIRED BY LAW AC#'33317'86 STATE ,OF FLORIDA DEPARTKBNT'OP BUSINESS AND PROPESSIONAL REGULATION . CONSTRUCTION INDt1STkY l.tCENSINO BOARD SEQ'LO'C8otCl03'70 , . . . _~SJtN&R. IO~/OS/20(l7 10000DOO(lO JOBD019S~9 The 8lJsnmss .ORQAN.IZA':r1:0N Named below IS QUALIFIED Under th. provisions of Chapt.r 489 FS. Bxpiration datel Aua 31, 2009 I (?:HIS IS H()'.l' A LICENSE '1'0 PERPORM WORJr. TRIS ALLOWS COMPANY TO DO BUSXNESS ONLY IF IT HAS A QUALIFIER.) LIme CONSTRuCTION GRO'D'P INC 7003 N WATBRNAYDR STE 218 ~ PL 33155 o CHARLIE CRIST GOVERNOR DISPLAY AS REQUIREO BY LAW HOl.LY BENSON SBCRE'l'ARY . C) ~ con!it:rUct:ion group --, I ."'. . Plcf8:fNTY i2l . . ST. fill R MIAMl. f1,. 331~ "'-'"''''.-, ~ JPl~~iil.~ ~.. ~ MvaT 8.&. IQF).VSl~ J ptJ'AsU.l.NTTO ~~m:TIII: '~o. -- - -iliiSi$ N.(3T 4 B\lI.o01ioT PAY - -- - RENEWAL STATtfcE6CWS9120 480167-4 218 iOOt 460498-0 Bllt!!W ~SIflifff'ON GROUP 7003 N WATERWAY DR 33155 UNIN DADE COUNTY tNC owr~K CONSTRUCTION GROUP INC ~TtrfltH~rAt BUILDING CONTRACTOR WORKERIS 4 ltUS IS OIlLl " \.DCA~ IIUiNSSTA'C RE.C:""T.n DO" fl01 "UlII" THE "O~OI:"lOIl1O~"TL A"Y IPlSTIHG OR MOllU70RY OR lONING U"5 OF filii I COUNTY 0.. cmu.1I011 ODE ~ " t.xEM.'1t(~ HOLDER 'fIOU AtlV O'nlEJI l"rR"" OR Riel.", M~IRW BY ~ loW. TlUS IS 1001 "Cf:"'''rcAnOI'i~ fHl t'~"'$OI/IIU'tC:", 110>I. -- DO NOT FORWARD LINK CONSTRUCTION GROUP IHe GUILLERMO FERNANDEZ PRES 7003 N WATERWAV DR STE .218 MIAMI Fl 33155 I I ~u.tifl "~IYED IllAM>-CWlE e~ TAl COLIICTtlAO 7/15/2008 I 60120000064 I 000075:00 i 11/' 11.11" I,ll I j .'111.'. " I t Ii, ,l.l,;, I Lith" II J. ,I,;L~" ARST-cLASS u.s. POSTAGE PAID MIAMI. FL PERMIT NO. 231 - ft~ ( con!it:rUction group . t~T ,I Board of County Commissioners, Broward County, Florida BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT FOR PERIOD OCTOBER 1,2008 THRU SEPTEMBER 3D, 2009 FORM NO 401.280IAC 25..061 RV200835367 (Rev 3108) PENALTIES IF PAID OCT. .10% I NOV. . 15~~ . DEC. - 20% . Aft. DEC. 31 . 25% . Plus Ta~ Collection Fee of up \0 $25,00 Based on Cost ot Business Tax ~ Paid On or Afler Novembor 30 TAX BACK TAX PENALTY T,C. FEE TRANSFER ";' i ~ { :J TRANSFER :J RENEWAL _.Ii SEe # - ,,", Q NEW DATE BUSINESS OPENED STATE OR COUNTY CERT/REG ~ Bualnn. Location Add,.." t. I ~ .. f' I.f. .. 1 j r~ '2; r .. .-' r :-' ..' ,"-- r- c": t;-: r*:. ACCOUNT NUMBER 01 (;1' TOTAL ~- . . I. {'II t,,;' .. . (" r- 'I,"" ~. i:' . ,. ..._ .=- ..~ ~"S -.;:~ : - ~ · '. II;' L.; l.. T I ' , N "I :.' :i~: ....i.n..t.t I"" '. T I 1 I"" ~~. t,'. ~ ~. I.) , I .,' ... .' I" r T '0; 1 r I THIS RECEIPT MUST BE CONSPICUOUSLY DISPLAYED TO PUBLIC VIEW AT THE LOCATION ADDRESS ABOVE, I,. . .''';- ~ - ~:"~ '_4 . '- l r'-- .-;' BPi4WARD ~ ~ COUNTY _____.____.. "r - ,..=4 ~-J~ '-' TYPE OF BUSINESS TAX PAID .'" ,t.: i I' I .,1 'f!'; Ii'" .; 2008 · 2009 PAYMENT RECEIVED AS VALIDATED ABOVE 'SEE INSTRUCTIDNS ON REVERSE SIDE BROWARD COUNTY REVENUE COLLECTION 115 S. Andrews Avenue, Rm A.1 00 FORT LAUDERDALE, FL 33301 www,broward.org/revenue If 1- Q c Waterstone II Clu ., , '~J IJJ::"" ; '- >'~ ..-.1'-- Q Ie Tvpe of Proiect: 6,000 Sq. Ft. Community Center 4,800 Sq. Ft. commercial swimming pool and 325 Sq. Ft. toddler pool Delivery Method: Negotiated Owner: Lennar Land Development c/o Mr. Rey Melendi Architect: Oliva Meoz Architects Mr. Hector Oliva-Princpal ~ ' " " [[lJ@ 8.; j " ~ Malibu Bay Recreation Cent con!itruction group . Tvpe of Proiect: 11,000 Sq. Ft. Community Center-Including a gym area, reception hall , 5,000 SF commercial swimming pool and 425 Sq. Ft. toddler pool Delivery Method: Negotiated ~ Owner: Lennar Land Development c/o Mr. Rey Melendi Architect: Oliva Meoz Architects Mr. Hector Oliva-Princpal Yt111 . < con!itruction group : [jr:-Fft "" ~~-'-" >t, ~ Oasis Community and ~t- I \ r l . Tvpe of Proiect: 11,000 Sq. Ft. Community Center-Including a gym area, reception hall , 10,000 SF commercial swimming pool and 550 Sq. Ft. toddler pool o Delivery Method: Negotiated Owner: Lennar Land Development c/o Mr. Rey Melendi Architect: Corwil Architects Mr. Alberto Cordoves-Princpal hlft~ . < con!itruction group '~'&ij[j J}~ ~ : ~ St. Thomas Universi . Tvpe of Proiect: 38,000 Sq. Ft. Exterior and Interior Build-Out of Student Dorm Rooms, Study Rooms, and Multi-Purpose Rooms .. 7 I -rr'",:--:;1 Delivery Method: Conventional Lump Sum Contract Owner: ST. Thomas University-Juan Zamora 16401 NW 37th Ave Miami Gardens, FL Architect: Villa & Associates -!l~ ~!;T;C~R~ -~~~,~<?I'~~'~~E~:~ ~!* 7344SW48STREET SUITE201 . MIAMI FL 33155 o Yt~ ( con!itruction group 1 " ~~ ~r~' I ~ ::::' J I \ " . African Heritage' o Type of Proiect: Out of the Ground, Multi-Story, 12,000 Sq. Ft. Building. Total Costs $3,500,000.00. Completed Cultural Center with Individual Music Rooms. Delivery Method: GMP Contract CM at Risk and Value Engineering Owner: Miami-Dade County Parks and Recreation Department Architect: Judson Architecture, Inc 18425 N.W. 2nd Ave, Suite 402 Miami, Gardens, FL 33169 o qIT~ . < con!itruction group "<C . .. - ~ -.,- ~........- r < 'J'JL2-u I_c__ '"" Martin Luther King G Proiect Description: Demolition of Existing Structure and New Construction of Recreational and Multi-Purpose Building with ADA Restrooms and Landscaping. Owner: Miami Dade County Parks and Recreation 275 NW 2nd Street Miami, FL 33128 305-755-7800 Architect: Axioma-3 Architects o I~ . < con!itruction group ." ~ G.~l -\,~f.1" o~\ "I' ;" ....."-_ LJ' U~..h__ Chabad lli . Proiect Description: Jewish Synagogue, Multi-Purpose Building and School Classrooms. Out of Ground, Single Story, 14,000 Sq. Ft. Building on 3 Acres of Sitework, Retention Areas and Landscaping. Total Costs- $4,800.000.00. Delivery Method: GMP Contract CM at Risk and Value Engineering Owner: Chabad Lubavitch Temple- Boynton Beach, Florida i.) Architects: Saltz Michelson Architects Attn. Charles Michelson 3501 Griffin Road Ft. Lauderdale, Florida 33312 . " _ j-' ,... _ ,r_' I I '" - _ :~)L; L ~ ^ Sho . ,.-,---- -~ Proiect Description: 28,000 Sq. Ft. Retail Shopping Plaza Delivery Method: Negotiated Owner: Shoppes of Ives Dairy Kae's Corner LLC, Partnership 610 NW 183rd Street Suite 202-A Miami Gardens, FL 33169 w Architect Representative: Gershen & Associates Paul Gershen 9769 S Dixie Highway Miami, FL 33156 . spe~~way ce_ . ...tl..'~. L__. ... ...~~;.:~ 1e./ ". ,~. ". ,,. ...^ ~.:' Proiect Description: 18,000 Sq. Ft. Retail-Office 2 story bldg. Delivery Method: Negotiated Owner: Speedway Center-Outparcel 2 9769 S. Dixie Highway #201 Miami, Florida 33156 Architect Representative: Gershen Associates, PA c/o Mr. Paul Gershen 9769 South Dixie Hwy Miami, FL 33156 o . . o 1I1~ '1IIl~ < con!itruction group :: ;fJ:~r-:- ~~ . i'! ,r~ '::"~ -....:-./-' Speedway ~ Proiect Description: 8,000 Sq. Ft. Retail Plaza Delivery Method: Negotiated Owner: Tropicaire Hialeah, Inc. 9769 S. Dixie Highway #201 Miami, Florida 33156 Architect Representative: Gershen Associates, PA c/o Mr. Paul Gershen 9769 South Dixie Hwy Miami, FL 33156 Yt~ . < con!itruction group StaPI~~, Inc.__ . LEED He silver certified Proiect Descriotion: 20,000 Sq. Ft. . Retail Office Supply Store -Built to LEED standards. First LEED Certified Retail space in Miami-Dade Delivery Method: Negotiated STAPlES' Owner: 2121 Biscayne Blvd. LLC Staples, Inc. 2121 Biscayne Blvd. Miami, FL 33134 . Architect Reoresentative: Sol-Arch 497 SW 74th Court Miami, FL 33155 . 'j :-V1~, I ' /.~ \../~-A': : ~! -7(:::' n" 'r ,-, ,,,,,'"'" 1'"11 I" I .........:.jLL.:.....:L -,,~J .' Shoppes a Chilis a'n r;;', ,'~' '~,' , , . e ~. --. "'-.~,~..~ . ,:-. -' ... .....,....._- .~~~ ) 'I G Proiect Description: 28,000 Sq. Ft. Retail Shopping Center Delivery Method: Negotiated Owner: Kae's Corner LLC. Partnership 610 NW 183 rd Street Suite 202-A Miami Gardens, FL 33169 Architect Representative: Gershen Associates, PA c/o Mr. Paul Gershen 9769 South Dixie Hwy Miami, FL 33156 o . r:, ;j', I (l-~';:::'- ^ .1 J "_"'_~' ... . , J' ~ ~J0r_~ _ '. -- con!itruction group Hi,s Featuring Starbu . Proiect Description: . 4,000 sq. ft. Starbucks and Game Stop Retail Stores Delivery Method: Negotiated Owner: HGBStar, LLC Starbucks Plaza 4770 Biscayne Blvd. Miami, FL 33137 Architect Representative: Gershen Associates, PA c/o Mr. Paul Gershen 9769 South Dixie Hwy Miami, FL 33156 o . -, I G ;.. > ~J 'Ir ,r; . ~'1 ,,:'_"i__ __ T' Proiect Description: Multi Story Commercial Office Park, 70,000 Sq. Ft. Tilt-Wall Construction Delivery Method: Negotiated ~'h'" '1- ofIIIf"--"'" ~ Owner: Industrial Warehouse Associates c/o Berny Kopel 1 0850 NW 21 st Street Miami, Florida 33172 Architect Representative: Ii~ :W~ VILLA & ASSOCIATES INC. : i_I ARCHITECTURE - PLANNING - INTERIOR DESIGN _!-- 7344 sw 48 STREET SUITE 201 - MIAMI FL 33155 o I\II~ Ii l~ . ( con!itruction group SunTrust Bank, NA_ . Proiect Descriotion 5,000 sq. ft. Brickell Avenue Office Build Out. Delivery Method: Hard Bid Owner: SunTrust Bank, NA c/o Mike Garcia 515 East Las Olas Blvd Suite 550 Ft. Lauderdale, FL 33301 Robert Reid Wedding Architects & Planners, AlA, Inc. . . Ave' * -"'r.H,.-- r1f<. I t l\JU..... h '1; . ". l.: _ "-_", ." . Type of Proiect: 150,936 sq. ft. Tilt-Wall Warehouse/Industrial Park Delivery Method: Hard Bid Owner: CPF Investment Group Mr. Ernie Cambo 2977 Mc Farlane Road # 302 Miami, FL 33133 ! ~!:t.~ ~ I I ~~~'::.3' H. ".. ,.... >Ie. u, ....."." " Architect Representative: RLC Associates, Inc. Ir.~:~~ '"1;':" :1....':~; , o AVE AViATION AND COMMERCE CENTER Yt~ . < con!itruction group ""~", . e'-' [ J.'-' ,- L-,I (-......: I' r-' lJ""""': I . ~""..=..J LJ'~l"- ...~..--...::..~~~.:-~~ o Proiect Description: 127,500 Sq. Ft. Tilt Up Warehouse/Office Building Delivery Method: Negotiated Owner: 114 Street Project HEC Warehouse 3355 NW 114th Street Miami, Florida o Architect Representative: Portuondo Perotti Architects 4102 Laguna Street Miami, Florida 33146 ", "LJ " - ,"\~ I ' . J ....~k_,_ --~ Saul Signs Corpor c ~ "'4 ~ " -.. ~ .. .. o ~ - - ---~" .................. Proiect Description: 26,000 Sq. Ft. Tilt Wall Construction for Corporate Headquarters. Delivery Method: Negotiated Owner: Scor Enterprises Saul Signs 14085 SW 143rd Court Miami, Florida Architect: Rodriguez Pereira Architects, Inc. 2601 NW. 89th, Court. Miami, FI. 33172 Phone: (305) 592-8045. FAX: (305) 592-5756 WWW.RODRIGUEZPEREiRA.COM Architecture Planning & Urban Design Space Planning Interior Design u,rp Lt. I M-COO1984 o Illrt~ . ( con!itruction group , " ,,;.- u[ -. r ' :. J i ) . IllA_'~ ~. ,'. VP Warehous o Proiect Description: 70,000 Sq. Ft. , 2 story, Tilt-wall Industrial Warehouse Office Building. Located within a Master Planned Industrial Warehouse Park, Doral, Florida. Delivery Method: Negotiated o Architect Representative: @=~M VILLA & ASSOCIATES INC, ; - ~ ARCHITECTURE - PLANNING . INTERIOR DESIGN _t-I 7344 SW 48 STREET SUITE 201 - MIAMI FL 33155 Owner: VP Warehouse West, Inc. 201 S. Biscayne Blvd. Suite 3000 Miami Florida 33131 . o :;- />::"' ru: ;r-- ""~~ .~ i: 10:.,,-, --11- 'J~:t:JIJ!) ''oj Waterwa Proiect Description: A seven (7) Acre Park Site featuring a multipurpose sports field, playground, basketball court, fitness trail and preservation of 1.5 acres of mangroves. This will provide needed recreational facilities in the northern portion of the City and ball fields that will be lit at night to expand the hours of operation. Waterways Park is currently under construction with the expansion to include Pet friendly Splash Park Delivery Method: Hard Bid Owner: City of Aventura c/o Mr. Tony Tomei 19200 West Country Club Dr. Aventura, FL 33180 Architect Representative: Craven Thompson & Associates, Inc. c/o Mr. Kevin Hart 3563 NW 53rd Street Ft. Lauderdale, Florida 33309 o IIlrt~ < con!itruction group -;;! r;:-::' . . rLlJlIULJ~, ' ,. "''' . . Proiect Description: 50,000 Sq. Ft. Retail Shopping Plaza. Delivery Method: Negotiated G Architect Representative: Cabrera Ramos Architects 9851 NW 58th Street #107 Miami, Florida 33178 Owner: Hammock Plaza Development Hammocks Plaza 7860 NW 66th Street Miami, Florida 33166 - C) ~ r. ,. ". - u_". --.- ~ ._.__, _ L L -~_._~ .xpenence Project Name: Owner: Architect: Contract Amount: Construction Commence: Parks and Recreation Under Construction Design-Build of Miami Springs Gymnasium, Theater & After Disaster Shelter. Ground Up, Multi Story 35,00 sq. ft. City of Miami Springs 201 West Ward Drive Miami Springs, FL 33166 Rodriguez Pereira Architect $5,800,000.00 January 2009 Project Name: Owner: Architect: Contract Amount: Construction Commence: James Archer Smith Park Demolition of existing park and construction of new park-5 Acres City of Homestead 790 North Homestead Blvd. Homestead, FL 33030 Bermello Ajamil and Partners $3,000,000.00 November 2008 . . !o Project Name: Owner: Architect Rep/Civil Eng: Contract Amount: Construction Complete: -,,~, ,~"- -"- ---. -- .. , ~- , . -. .,~__.u~ xpenence Parks and Recreation Construction Complete Waterways Park A seven (7) Acre Park Site featuring a multipurpose sports field, playground, basketball court, fitness trail and commu nity center and preservation of 1.5 acres of mangroves. City of Aventura-Mr. Tony Fomei 19200 West Country Club Drive Aventura, Florida 33180 Craven Thompson & Associates $3,042,362.00 April 2008 Project Name: Owner: Architect Rep/Civil Eng: Contract Amount: Construction Complete: City of Aventura Dog Park Pet Friendly Splash Park City of Aventura 19200 West Country Club D Craven Thompson & Associates $276,318.00 May 2008 o Project Name: Owner: Architect: Contract Amount: Construction Commence: Commercial I Retail I Warehouse Under Construction The Point At Doral-Phase II Tilt-up Multi Story-25,000 sq. ft. Commercial Office Park Industrial Warehouse Associates, Inc. 10850 NW 21 st Street Suite #230 Miami, Florida 33172 Villa & Associates Architects and Planners, Inc. $1,878,834.00 December 2007 Project Name: Owner: o Arch itect: Contract Amount: Construction Commence: Giralda Complex Phase I Mixed-Use Commercial, Office, Retail, Banking Giralda PB, LLC. - Mr. Alberto Lensi 2222 Ponce De Leon Blvd. Suite 500 Coral Gables, FL 33134 Fullerton Diaz and Associates $3,297,694.00 January 2008 Project Name: Owner: Architect: Contract Amount: Construction Commence: Ave Aviation & Commerce Center Bldg N Tilt-Wall Warehouse /Industrial Park-150,936 sq. ft. CPF Investment Group, Inc. Mr. Ernie Cambo-Principle 2977 McFarlane Road #302 Miami, FL 33133 RLC Associates, Inc. $8,140,558.00 March 2008 Project Name: Owner: (.) Architect: Contract Amount: Construction Commence: Our Lady of Lourdes Catholic School Educational/ Cafeteria Facility/Computer Lab Two (2) Story-25,000 sq. ft. The Archdiocese of Miami 11400 SW 112th Street Miami, Florida Villa & Associates Architects and Planners, Inc. $2,580,613.00 January 2008 . . ~ r~ Project Name: Owner: Architect: Contract Amount: Construction Commence: ~ ,- . -.- " " "- ".~ ..- ". ~. -- II~ Experience Commercial I Retail I Warehouse Under Construction-Continued Causeway Square 160,940 Sq. Ft. 4 Story Mixed Use Building and Parking Garage/Bank Outparcel/Retail Outparcel Taubco 9551 East Bay Harbor Drive Bay Harbor, FL 331554 Saltz-Michelson Architects $21,000,000.00 November 2008 e Project Name: Owner: Architect: Contract Amount: Construction Complete: Experience Commercial I Retail I Warehouse Construction Complete Hialeah Gardens Plaza Starbucks-Game Stop Retail Stores, 4,000 Sq. Ft. HB Star, LLC 4770 Biscayne Blvd. Miami, Florida 33137 Gershen Associates, P.A. $786,531.00 March 2008 Project Name: Owner: . Architect: Contract Amount: Construction Complete: Staples, Inc. 20,000 sq. ft. Retail Office Supply Store Silver LEED Certified Building 2121 Biscayne Blvd., LLC 150 Alhambra Circle Suite #800 Coral Gables, Florida 33134 Sol-Arch $2,571,194.00 March 2008 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Speedway Center Outparcel 2 Retail-Office 2 Story Bldg.-18,000 sq. ft. Tropicaire Hialeah, Inc. 9769 S. Dixie Hwy. Suite #201 Miami, Florida 33156 Gershen Associates, P.A. $1,163,291.00 July 2008 Project Name: Owner: Architect:. Contract Amount: Construction Complete: Speedway Center Outparcel 1 Retail Plaza-8,000 sq. ft. Tropicaire Hialeah, Inc. 9769 S. Dixie Hwy. Suite #201 Miami, Florida 33156 Gershen Associates, P.A. $577,294.00 July 2008 Project Name: Owner: o Architect: Contract Amount: Construction Complete:: 72nd Avenue Flex Space 8,000 sq. ft. Office I Warehouse Flex Space Mr. Manuel Hernandez 7860 NW 66th Street Miami, Florida 33166 Cabrera Ramos Architects, Inc. $1,944,759.00 November 2008 - ~. Project Name: Owner: Architect: Contract Amount: Construction Complete: ~ ." - ---- . __H_, '~E . ... xpenence Commercial I Retail I Warehouse Construction Com plete-Continued VP Warehouse Building III 70,000 SF - 2 Story Tilt Up Warehouse/Office Building VP Warehouse West LLC 2700 NW 112th Ave Miami, FL 33172 Villa & Associates Architects and Planners, Inc. $3,520,000.00 June 2006 Project Name: Owner: Architect: Contract Amount: Construction Complete: Shoppes of Ives Dairy Shopping Center 28,000 SF - Retail Shopping Center Kaes Corners LLC. - William Green, Jr. 19801 NW 2nd Ave Miami Gardens, FL Gershen Associates Architects, Inc. $2,960,000.00 July 2006 o Project Name: Owner: Architect: Contract Amount: Construction Complete: Saul Signs 26,000 sq. ft. - Tilt-wall Construction Corporate Headquarters Scar Enterprises 14085 SW 143rd Court Miami, FL Rodriguez Pereira Architects, Inc. $1,835,000.00 December 2006 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Kendall Commerce Center Warehouse 1 & 2 Two (2) 17,000 sq. ft. Warehouse-Office Buildings Canyons Roar Investments 7951 SW 40th Street, Suite 200 Miami, FL 33155 Gilbert Mojica, P.E. $1,900,000.00 September 2005 Project Name: Owner: o Arch itect: Contract Amount: Construction Completed: All Dade Lawnmowers - Corporate Offices 6,000 sq. ft. Showroom/Office - Masonry Building Torrente Properties LLC. 1495 NW 111th Avenue Miami, FL 33172 Rodriguez Pereira Architects $645,000.00 May 2006 o ~- - Project Name: Owner: Arch itect: Contract Amount: Construction Complete: . w.. . "7 H_ .,..11- Experience' .w. Commercial I Retail I Warehouse Construction Com plete-Continued HEC Warehouse Tilt Up Warehouse/Office Building Featuring 127,500 sq. ft. 114th Project 2222 Ponce De Leon Blvd. Suite #500 Coral Gables, Florida 33134 Portuondo Perotti Architects $5,869,415.00 February 2008 Project Name: Owner: o Arch itect: Contract Amount: Construction Complete: The Point At Doral Phase I Multi Story Commercial Office Park Tilt-Wall Construction-70,000 sq. ft. 10850 NW 21st Street Suite #230 Miami, Florida 33172 Villa & Associates Architects and Planners, Inc. $4,540.866.00 February 2008 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Solo Printing, Inc. CMU Warehouse, Printing Facility Featuring 30,000 sq. ft. Olos Investments 7860 NW 66th Street Miami, Florida 33166 Cabrera Ramos Architects, Inc. $2,035,073.00 February 2008 Project Name: Owner: o Arch itect: Contract Amount: Construction Complete: Hammocks Plaza Retail Shopping Plaza Featuring 50,000 sq. ft. Hammocks Plaza Development 7860 NW 66th Street Miami, Florida 33166 Cabrera Ramos Architects, Inc. $4,569,955.00 March 2008 o ~ .- Project Name: Owner: Architect: Contract Amount: Construction Complete: . .'. .._-~-~ ~ Commercial I Office I Retail Tenant Improvements Construction Complete CB Richard Ellis Expansion Interior Tennant Improvements and Expansion CBRE-Brickell Office Plaza 777 Brickell Avenue 9th Floor Miami, Florida 33131 Barry Slack, PA $280,101.00 August 2007 Project Name: Owner: o Architect: Contract Amount: Construction Complete: SunTrust Bank-Corporate Offices Brickell Avenue-Office Build Out SunTrust Bank Real Estate 515 East Las Olas Blvd. Suite #550 Fort Lauderdale, Florida 33301 International Design Partnership, Inc. $227,478.00 November 2007 Project Name: Owner: Architect: Construction Complete: SunTrust Bank-Brickell Avenue Branch Lobby -Office Build Out SunTrust Bank Real Estate 515 East Las Olas Blvd. Suite #550 Fort Lauderdale, Florida 33301 Robert Reid Wedding Architects September 2007 Project Name: Owner: Architect: Contract Amount: Construction Complete: o Nemiroff & Auslander PA Law Office Interior Tenant Build Out SunTrust Bank Real Estate 515 East Las Olas Blvd. Suite #550 Fort Lauderdale, Florida 33301 International Design Partnership, Inc. $359,094.00 September 2007 -- Project Name: Owner: Architect: Contract Amount Scheduled Completion Commercial I Office I Retail Tenant Improvements Complete-Continued HENCORP Corporate Office Interior Build out 15,000 sq. ft. Interior Office Build out Brickell Office Plaza / CB Richard Ellis 777 Brickell Ave, 10th Floor Miami, FL 33134 Peggy Nye & Lodin Architects $915,360.00 August 2005 Project Name: Owner: G Architect: Contract Amount Scheduled Start Kiwanis Little Havana Corporate Offices 4,400 sq. ft. - 2 Story Interior Build out Kiwanis Little Havana Armando Cosio Sequeira & Gavarrete Architects $528,000.00 August 2005 Project Name: Owner: Arch itect: Contract Amount Scheduled Completion Golden Glades Corporate Office Park - ADA Restroom Upgrades & Remodel 4 Story Building - Common Restroom ADA Upgrades 1405 NW 167th Street Miami Gardens, FL Golden Glades Office Park LLC / NAI Miami Mr. Ira Shapiro - 305-621-7774 Tewes Architects $250,000.00 August 2005 Project Name: Owner: Architect: Contract Amount Scheduled Completion C> Ocasa International Valuables Facility 4,500 sq. ft.-Interior Office Alteration 11330 NW 36th Street Doral, FL Ocasa International Ken Brown-305-591-0634 Angel Saqui AlA, Architects $905,000.00 May 2006 - r-"-' --" -- " Commercial I Office I Retail Tenant Improvements Complete-Continued Project Name: The Electric Sandbox - Hair & Tanning Salon Build out 1,800 sq. ft. Interior Build out The Electric Sandbox 100 S.E. 2nd Street, 33rd Floor Miami, FL 33134 Red Design Group Architects $445,360.00 September 2005 Owner: Architect: Contract Amount: Completed: Project Name: 2103 Coral Way Spec Space Build out 4,000 sq. ft. Interior Office Build out 2103 Office Bldg / NAI Miami 9655 S Dixie Hwy, Suite 200 Miami FL 33134 Angel Saqui Architects $148,560.00 December 2005 Owner: . Arch itect: Contract Amount: Completed: Project Name: Doral Commerce Park Bldg B - Condo Conversion 100,000 sq. ft. Interior OfficelWarehouse Condo Conversion . Doral Commerce Park L TO, LLLP. Ernesto Cambo, Principal 2799 McFarlane Road, #303 Coconut Grove, FL Rodriguez Pereira Architects $970,000.00 May 2005 Owner: Arch itect: Contract Amount: Completed: Project Name: The Graham Companies Bldg 11 6,000 sq. ft. Warehouse/Office Alteration The Graham Companies, Larry Nienauber 6843 Main Street, Miami Lakes, FL Forbes Architects $136,000.00 May 2005 Owner: Architect: Contract Amount: Completed: Project Name: Warner Channel-HBO Latin America Interior Build out 6,500 sq. ft. Interior Office - Class A Office Build out Warner Channel - Latin America 777 Brickell Ave - Penthouse Miami, FL 33131 Leo A . Daly Architects $342,620.00 January 2005 Owner: G Architect: Contract Amount: Completed: . ~. -- __ ,I II'E_ ' xpenence Commercial I Office I Retail Tenant Improvements Complete-Continued Project Name: Crepemaker @ The Falls Interior Build out 1,200 sq. ft. Cafe/Restuarant Crepemaker 8888 SW 136 Street Miami, FL William Placencia Architects $28,620.00 February 2005 Owner: Architect: Contract Amount: Completed: Project Name: Bistrolicious Cafe Interior Build out 1,200 sq. ft. Cafe/Restuarant Bistrolicious Cafe - Adriana Guerrero 3655 NW 107'h Ave, Unit 102 Miami, FL Pacetti Architects $71,620.00 February 2005 Owner: o Arch itect: Contract Amount: Completed: Project Name: Dolphin Commerce Spec Space Build out 1,500 sq. ft. office building and 6,000 SF warehouse Dolphin Commerce Center - CBRE 11350 NW 25th Street, Unit 116 Miami, FL Carlos Diaz & Associates Architects $116,000.00 March 2005 Owner: Architect: Contract Amount: Completed: Project Name: Tiffany Continental Interior Build out 8,000 sq. ft. office building and warehouse Tiffany Continental 5900 NW 97'h Ave, Unit 5 thru 10 Miami, FL Rodriguez Pereira Architects $313,000.00 February 2005 Owner: Arch itect: Contract Amount Completed Project Name: Rinker Materials - Exterior I Interior Remodel Metal Building Repairs/Concrete Ramp/Overhead Door Jodansi Investments I Permont Development 9700 NW 17th St Miami, FL Villa & Associates Architects and Planners, Inc. $58,250.00 July 2005 Owner: o Architect: Contract Amount: Completed: . - . Project Name: Owner: Architect: Contract Amount: Completed: ~ ., ~ .~ ~ Commercial I Office I Retail Tenant Improvements Complete-Continued City of Miami Gardens City Hall Offices 10,000 sq. ft. Interior Build out Golden Glades Associates c/o NAI Miami Realty 9655 South Dixie Highway Suite 200 Miami, FL 33156 Tewes Design Group $278,000.00 August 2004 Project Name: Owner: Architect: Contract Amount Completed: AARON Industrial Safety Interior Build out 1,800 sq. ft. Interior Build out Omar Parets 6871 NW 3ih Court Miami, FL 33147 Williams/Delance Architects $85,500.00 December 2004 o Project Name: Owner: Arch itect: Contract Amount Completed Doral Commerce Park - Suite 400 Build out 15,200 sq. ft. Warehouse - 1 ,500-SF Office Doral Commerce Park L TD, LLLP. Ernesto Cambo, Principal 2799 McFarlane Road, Suite 303 Coconut Grove, FL Rodriguez Pereira Architects $125,000.00 December 2004 Project Name: Owner: Architect: Contract Amount Scheduled Start Doral Commerce Park - Suite 200Addition 900 sq. ft. Interior Office Addition - Warehouse/Office Doral Commerce Park L TD, LLLP. Ernesto Cambo, Principal 2799 McFarlane Road, Suite 303 Coconut Grove, FL Rodriguez Pereira Architects $75,000.00 October 2004 Project Name: Owner: o Architect: Contract Amount Construction Complete: Superior Export - Senator International- Interior Expansion 1,500 sq. ft. Interior Office / Warehouse Remodel Dolphin Commerce Center Amy Ferguson, Property Manager 11200 NW 25th Street Suite 125 Miami, FL 33172 Carlos Diaz Architects $58,454.00 November 2004 o r Project Name: Owner: Architect: Contract Amount Construction Complete: . '. " -- - '''.~ Commercial I Office I Retail Tenant Improvements Complete-Continued Jennifer Convertibles - Interior Remodel 5,200 sq. ft. Build out Advantis GV A 900 Park Centre Blvd. Hilda Mendoza Villa & Associates Architects and Planners, Inc. $78,000.00 June 2004 Project Name: Owner: o Arch itect: Contract Amount Construction Complete: Zamora Hillman Attorneys - Interior Office Remodel ZamHill Properties 3006 Aviation Ave Miami, FL Villa & Associates Architects and Planners, Inc. $65,840.00 June 2004 Project Name: Owner: Architect: Contract Amount Construction Complete: Cherokee Enterprises - Interior Build out 4,200 sq. ft. Interior Office Build out The Graham Companies, Larry Nienauber 6843 Main Street Miami Lakes, FI. Forbes Architects $145,000.00 April 2004 Project Name: Owner: Architect: Contract Amount Construction Complete: South Florida Foods - Interior Build out 4,000 sq. ft. Interior Office Build out Maurice Dussaq II, President 5900 NW 9th Ave Miami, FI. Rodriguez Pereira Architects $155,000.00 March 2004 Project Name: Owner: ~ Architect: Contract Amount Construction Complete: The Monarch - Exterior/Interior 5 Story Building Remodel Robert Cambo - Principal 2799 McFarlane Road, 3rd Floor Miami, FL Sackman2 $465,250.00 March 2004 . r- ~" Project Name: Owner: Architect: Contract Amount Construction Complete: - - E~ Commercial I Office I Retail Tenant Improvements Complete-Continued Marco Destin Interior Demo & Remodel C.B.R.E -CB Richard Ellis Ilene Velez, Property Manager 11200 NW 25th Street, Suite 125 Miami, FL 33172 Villa & Associates Architects and Planners, Inc. $28,000.00 January 2004 Project Name: Owner: o Arch itect: Contract Amount Construction Complete: Mid America International-Interior Remodel 2500 sq. ft. Interior Remodel Dolphin Commerce Center Amy Ferguson, Property Manager 11200 NW 25th Street, Suite 125 Miami, FL 33172 Retzsch Lanao Caycedo Architects $77,454.00 January 2004 Project Name: Owner: Contract Amount Construction Complete: (6) New Miami Dade County Bus Shelters Cemusa Miami Ltd. Juan Cueto, General Manager 2119 NW 84th Ave Miami, FL 33136 $55,692.00 January 2004 Project Name: Owner: Arch itect: Contract Amount Construction Complete: Loft Condominium Sales Center- Interior Remodel 1,600 sq. ft. Sales Center Build out The Related Group, Inc. Oscar Rodriguez, Vice President Villa & Associates Architects and Planners, Inc. $85,000.00 December 2003 Project Name: Owner: o Architect: Contract Amount Construction Complete: UNO Financial Group - 6,000 sq. ft. Office Remodel UNO Financial Group, Inc. Luis Hernandez, President 2100 Ponce De Leon, Suite 1200 Coral Gables, FL Villa & Associates Architects and Planners, Inc. $75,000.00 November 2003 - Project Name: Owner: Architect: Contract Amount Construction Complete: Commercial I Office I Retail Tenant Improvements Complete-Continued 2121 Ponce De Leon - Penthouse Restroom Remodel Advantis Realty - GV A Hilda Mendoza, Senior Property Manager 2121 Ponce De Leon, Suite 705 Coral Gables, FL Villa & Associates Architects & Planners, Inc. $44,000.00 November 2003 Project Name: Owner: Arch itect: Contract Amount Construction Complete: o 2121 Ponce De Leon - Suite 930 Office Remodel Advantis Realty - GV A Hilda Mendoza, Senior Property Manager 2121 Ponce De Leon, Suite 705, Coral Gables FL Villa & Associates Architects & Planners, Inc. $28,500.00 November 2003 Project Name: Owner: Arch itect: Contract Amount Construction Complete: Savino Del Bene Interior Remodel Lightspeed - Swerdlow Development Co. Amy Ferguson, Property Manager 11200 NW 25th Street, Suite 125 Miami, FL 33172 Carlos Diaz & Associates $12,625.00 August 2003 Project Name: Owner: Architect: Contract Amount Construction Complete: Netrox Inc. - North Dade Office Interior Remodel 1,800 sq. ft. Netrox Inc. - Alex Rodriguez 900 Park Centre Blvd. Miami, FL Villa & Associates Architects and Planners, Inc. $35,250.00 August 2003 Project Name: Owner: o Architect: Contract Amount Construction Complete: Interamericana Expansion Lightspeed - Swerdlow Development Co. Ilene Velez, Property Manager 11200 NW 25th Street, Suite 125 Miami, FL 33172 Carlos Diaz & Associates $48,000.00 February 2003 . r -~ Project Name: Owner: Architect: Contract Amount: Construction Complete: .- ~J_ .- JI~E ... . xpenence Commercial I Office I Retail Tenant Improvements Complete-Continued Senator International Expansion Lightspeed - Swerdlow Development Co. Amy Ferguson 11200 NW 25th Street, Suite 125 Miami, FL 33172 Carlos Diaz & Associates $61,000.00 June 2003 Project Name: Owner: c Architect: Contract Amount: Construction Complete: Project Name: Owner: Arch itect: Contract Amount: Construction Complete: 2121 ~once De Leon - Suite 710 Remodel Advantis Realty - GV A Hilda Mendoza, Senior Property Manager 2121 Ponce De Leon, Suite 445 Coral Gables, FL Corwill Architects $23,000.00 May 2003 Chase Financial Services - Suite 705 - Gables Cititower Advantis Realty - GV A Hilda Mendoza - Senior Property Manager 999 Ponce De Leon, Suite 101 Coral Gables, FL Corwill Architects $21,000.00 May 2003 Project Name: Owner: Arch itect: Contract Amount Construction Complete: Royal Palm Crowne Plaza Resort I Interior Alterations Royal Palm Crowne Plaza Resort 1545 Collins Avenue Miami Beach, FL 33139 Architectonica Architects, Sherry Gutierrez 550 Brickell Avenue Miami, FL 33131 $235,000.00 September 2002 Project Name: Owner: G Architect: Contract Amount Construction Complete: H & R Block - West Dade Offices 11449 SW 40th Street Miami, FL RCC Property Advisors 900 North Federal Highway, #300 Boca Raton, FL 33432 Wayne E. Vensel Architect, Inc. $125,000.00 July 2002 0, o o ~ --- "'~.~ xpenence - - Commercial I Office Interiors Tenant Improvements Complete-Continued Project Name: Savino Del Bene Corporate Offices 2,500 sq. ft. -Interior Office Construction 8815 NW 33rd Street Doral, FL Principal Global-c/o CB Richard Ellis Mrs. Karen Schienberg, Construction Project Manager 777 Brickell Avenue, Suite #900 Miami, FL Phone 305-381-6401 Angel Saqui AlA, Architects $255,000.00 Owner: Architect: Contract Amount: - Project Name: Owner: Architect: Contract Amount: Construction Complete: Master Planned Communities Amenities Construction Complete Malibu Bay Clubhouse & Entry Feature 6,200 sq. ft. Clubhousel 4,800 SF Swimming Pool Lennar Homes 1 LDI Mr. Pedro Portela, Sr. Project Manager-Land Development 730 NW 107th Avenue, 4th Floor Miami, FL Oliva Meoz Architects $1,738,798.00 July 2007 Project Name: Owner: ,e Architect: Contract Amount: Construction Complete: Oasis Clubhouse and Entry Feature 4,000 sq. ft. Clubhouse 110,000 Sq. Ft. Swimming Pool/ Common Areas Lennar Homes / LDI Waterstone IIJV Mr. Pedro Portela, Sr. Project Manager-Land Development 730 NW 107th Avenue, 4th Floor Miami, FL Corwil Architects $3,143,000.00 October 2007 Project Name: Owner: Architect: Contract Amount: Construction Complete: o Waterstone Clubhouse & Entry Feature 4,800 sq. ft. Clubhousel 4,500 SF Swimming Pool Lennar Homes 1 LDI Waterstone IIJV Mr. Pedro Portela, Sr. Project Manager-Land Development 730 NW 107th Avenue, 4th Floor Miami, FL Oliva Meoz Architects $1,546,585.00 September 2007 o r - Project Name: Owner: Arch itect: Contract Amount: Construction Complete: - - . Residential I Multi-Family Construction Complete Bendevco - West Miami Twin Home New 4,000 sq. ft. - 2 Story Twin Home 1565 SW 65 Place West Miami, FL BEN Development Co. - Mr. Bernie Navarro 13155 SW 42nd Street Suite 107 Miami, FL 33175 Martin A.D. Yabor Associates $300,000.00 March 2005 Project Name: Owner: o Architect: Contract Amount: Construction Complete: Mr. & Mrs. Don Peebles Residence Remodel & Alterations Existing 14,000 sq. ft. - Interior Remodel Mr. & Mrs. Donahue Peebles Coral Gables, FL 33134 Phone 305-443-4342 Ramon Pacheco & Associates $450,000.00 March 2005 Project Name: Owner: Architect: Contract Amount: Construction Complete: 10 Parkview Estates - 6 Single Family Residence Development. with Off Sitework 3,000 sq. ft. -1 Story - CMU Block - Each Residence 15250 SW 160 Place Miami, FI. Mr. Berny Kopel, President, Peninsula Developers 2700 NW 112th Ave Miami, FL 33172 Phone 305-597-7110 Villa & Associates Architects & Planners, Inc. $1,350,000.00 September 2006 o Project Name: Owner: Architect: Contract Amount: Construction Complete: Residential I Multi-Family Construction Com plete-Continued Bendevco - Coral Gables Twin Home 5,000 sq. ft. - 2 Story Twin Home 404 Zamora Avenue Coral Gables, FL 33133 BEN Development Co. - Mr. Bernie Navarro 13155 SW 42nd Street, Suite 107 Miami, FL 33175 Martin A.D. Yabor Associates $600,000.00 June 2006 Project Name: Owner: I) Architect: Contract Amount: Construction Complete: o Santander - Coral Gables Twin Home 6,000 sq. ft. - 2 Story Twin Home Santander Avenue Coral Gables, FL 33133 BEN Development Co. - Mr. Bernie Navarro 13155 SW 42nd Street, Suite 107 Miami, FL 33175 Villa & Associates Architects and Planners, Inc. $689,000.00 May 2007 o Project Name: Owner: Architect: Contract Amount: Construction Complete. o o Educational/Institutional Construction Complete St. Thomas University - Student Dorms - Design Build 37,000 sq. ft. - 4 Story ST. Thomas University - Juan Zamora 16401 NW 37th Ave Miami Gardens, FL Villa & Associates Architects and Planners, Inc. $4,300,000.00 September 2006 w - . ~~ I -......-----..r1 _ 'IJ'..~~.: r~~ 1_ L James Ii.. City of Homestead Parks & Recreation -- -- /--~ \.OIHO~~ ''/,,''6......'''~~~.. . ., ., ~ ,/ ~<,r ~\ " j . I : ~J 5l:~:=:---=-~l,.~=-~_~~l ...~ilJ.1BIIIIID_ . . C J T'" 0 F I l H~~ESTEA~ o Proiect Description: Public Park Build Out. Project consists of the demolition of an existing park, parking, fencing and other elements and the construction of a totally new park. Owner: City of Homestead 790 North Homestead Blvd Homestead, FL 33030 ~ Architect Representative: Bermello-Ajamil & Partners 2601 South Bayshore Drive Suite 1000 Miami, FL 33133 .h~ . ( con!itruction group ~ y ,tI - r- ._ , . 'J....c....:. _ " , Our Lady of Lourd ~ J. -.J...;I. -4: -"". '"f Type of Proiect: Our Lady of Lourdes School Media Center, Cafeteria, Offices and Classrooms. Out of the Ground, Multi-Story, 25,000 Sq. Ft. Building Delivery Method: Conventional Lump Sum Contract Owner: The Archdiocese of Miami 11400 SW 112th St. Miami, FL Architect: Villa & Associates, Inc. I ~ "~' ~"" .t C!a~ - _ _ h\t- ~!;T;C~R~ -~~~,~?I'~~':'~E~:~ ~ff 7344 sw 48 STREET SUITE 201 - MIAMI FL 33155 v -- , i C 'l.J [JjJJJ~_ - > City of Miami Springs-C And After Disaster Shelter o Tvpe of Proiect: Design / Build-CM @R with GMP Contract .Dual Phased Out of the Ground, Multi-Story 34,000 Sq. Ft. building, Demolition & New Parking Lot. Owner: City of Miami Springs 201 West Ward Drive Miami Springs, FL 33166-5289 Architect Representative: Rodriguez Pereira and Associates, Inc. 8000 NW 7th Street, Suite 103 Miami, FL 33126 " . Playa P'I' :~... '0".1 ~U:ju;_-~ Proiect Description: Acre - 18.66 Consists of full site improvements to include sewer, lift station, water, earthwork, retention areas, drainage, paving, DOT deceleration lane, etc. Delivery Method: Hard Bid Owner: Mr. Mark Blieden Playa Plaza, LLC, 6100 Dutchman's Lane-Kaden Tower 6th Floor Louisville, KY 40205 c Architect! Civil Enaineer: Kimberly Horn & Associates, Inc. 1201 19th Place Suite B-100 Vero Beach, FL. 32960 ~=n Kimley~Horn and Associates. Inc. o '>',,"1;' G ~J'2f~Y~),_. " , . '~ . Proiect Description: 160,940 sq. ft. Mixed Use Commercial, Office, Retail, Banking, Structural Steel building with con- crete fill. Parking Garage-135,797 sq. ft., Bank-5.00 sq. ft., Vitamin Shop--4,OOO sq. ft. , Delivery Method: Negotiated Owner: Taubco Architect Representative: Saltz-Michelson Architects SALTZ ~IICHELSO\ ----- - - - - - - - ~- - - - ARCHITECTS v . ',rr::\JS 'J..- I <.' Cb 'I rr: 11 ~ '"-..0"" _.... ...........~ .~ , -e'_ . o Proiect Description: 30,000 sq. ft. Mixed Use Commercial, Office, Retail Banking Delivery Method: Negotiated Owner: Giralda PB, LLC. Mr. Alberto Lensi 2222 Ponce De Leon Blvd. Suite 500 Coral Gables, FL 33134 Architect Representative: Fullerton Diaz and Associates ~~ lR~"'lft~f~ o Yt~ o ( con!itruction group '"-- H,-.,'('I, r- , I 'JU0~Lf ~:_:- Jesus ~ ~::~...:.:.:~::::.-'~~".;:~rt:..\ .-.... ::, ;;~::'::;:.~:-r: ";';: ;:. .~ ::. I -';f~---::;~; ~~--< Type of Proiect: New Construction of 25,000 Sq. Ft. Worship Center and Development of 3 Acre Site with Parking, Landscaping and Site Lighting. December 2008 groundbreaking. Delivery Method: Owner Negotiation Owner: Administrator-Elder Timothy C. Taylor, Sr. Architect: Frank Costoya Architect, P.A. w SR A1A1Collins Avenue Streetscape (From 187th to Wm Lehman Causeway) Sunny Isles Beach, Florida 33160 To: Office of City Clerk City of Sunny Isles Beach Attn: Review Panel 18070 Collins Avenue Sunny Isles Beach, FL 33160 We appreciate the opportunity to introduce our firm to you. Founded in 2001, Link Construction Group is an award-winning local full service general contractor. We excel in out of the ground construction, as well as, Design-Build, Hospitality, Office, Industrial, Institutional, Retail Shopping Centers, demolition and renovations, and related construction as Interior Tenant Improvements. We have the experience, the technology, the resources, and the desire to meet any challenge. At Link Construction Group, we are poised on the threshold of the future, ready to serve your needs. By consistently completing projects on-time, within budget, and to the highest level of satisfaction we have built a solid reputation. We perform to the same rigorous standards for safety, quality, and client satisfaction on each and every project we build. Additionally, we bring many years of hands-on construction expertise to all of our projects. As your construction services provider, we serve as a staff extension, managing every detail and facilitating the process to meet your needs. The construction process begins by clearly defining your needs. Once these parameters have been established, we then implement our value management procedures that streamline the con- struction method and recommend cost-savings ideas for quality improvements without sacrificing the integrity of the project's construction or completion. Regardless of project size or complexity, our commitment to servicing you is unparalleled. Enclosed within is our executed response signed and notarized and further we acknowledge four (4) Addenda's received. Copies are enclosed and identified with receipt date. We look forward to working with you and your team and welcome the opportunity you afforded us. Thank you for your interest and consideration h Guillermo Fernandez, President Enc. o. ,'lJ\>t SECTION 7 BID RESPONSE SHEET THIS BID IS SUBMmED TO: City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Bid No. 08-10-01 for SR AlA/Collins Avenue Streetscape Improvements The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an agreement with The Oty of Sunny Isles Beach in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 7.1. The Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidder's, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Bidder agrees to sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within ten days after the date of the City's Notice of Award. 7.2. In submitting this Bid, the Bidder represents, as more fully set forth in the Agreement, that: 7.2.1. Bidder has examined copies of all the Bidding Documents and of the following Addenda (receipt of all which is hereby acknowledged.) Addendum No. Addendum No. Addendum No. Addendum No. 1 2 3 4 Da~: December 1. Please see attached Dated: December 1. Please see attached Dated: December 1. Please see attached Da~: December 5. Please see attached 7.2.2. The Bidder has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. 7.2.3. The Bidder has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. 7.2.4. The Bidder has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies (in addition to or to supplement those referred to in (c) above) which pertain to the subsurface or physical conditions at the site or otherwise may affect the cost, progress, performance, or furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, and no additional examinations, investigations, explorations, tests, reports or similar information or data are or will be required by Bidder for such purposes. 7.2.5. Bidder has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or continuous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, report or similar information or data in respect of said Underground Facilities are or will be required by PAGE 39 Of 130 BID No. OB-10-01 (>DJ>SNDu"'l Z- Staff: City of Sunny Isles Beach Mandatory Pre-Bid Conference - Sign-In Sheet Bid No. 08-10-01 For SR AlA/Collins Avenue Streetscape Improvements 18070 Collins Avenue, lit Floor Meeting Room, Sunny Isles Beach, FL 33160 Monday, December 1, 2008, 2:00 p.m. ~ t ~ ~~ " ., "~€M', 'O'Lt),\#', <l-A-.oe-. C!\a41t)~\kL- ()w~J D'~A-~. ~,J ~,.l€ f A-t;,V~"" -&..J~I,Jt%F-~f \ ~C. {bl\,L- ~ I fw ~l"Z>'t" ~l~EOV(2.. MAut-lCA.o ~~rz.; ~,.l ~. Guests Name~","",Ct5? C;; ~ 0 ~ jh c... r-U \ 0 . Company Name: ~ 5erv,'c..e s. ,.:;r::-n (J . Address: C? 700 j.) u.} -;c? t1, IJ rl'- City: ~ Cllk.( Phone: '7[3(p ?>?~'5 z.12- Fax: ~ /81 B Zl/zS. , Tid" (1ons/vd.fJr, J.(Ser. State: -=F-L - Zip: ":??>O/&:>. Emait: fl5n~rOi> .p~ I,." se....&..I ,es . Name: iu/5 \=': -:K, o~Q.A- MoIJT~ Title8u~;AJl..65 -Y~d.(Jrft.w CompanyName:SLlA..fl..aa.. Lt1tJu.5C'A-Pt'AJl ~' l~w,:) ,,-S,.t-VI'CJ~t; Address: p() 80 Jl.... 3 S- . 00 9 S City: jl1,'j\. tt\ \ State: ~ Zip: '0 a J.3 S-' Phone: aOS" q4- 0 ~ 11../ Fax: 3()5. ~3q'07C/V Email:\cI Name: ~,~ 1(" /~ 02 vv 1-.1/ Company Name: G C T ., (..VI '- /I.:ll'" Address:....t3o /J f;. ( ~-I-" r ~#h.( City: ,NL~"",,1lJ Phone: tiJ'1 j....'3 3374 Fax/?yil ~b3 3fi"'1 Title: l?:S' State:)?L Zip: 3 3 '$ (.) )" - ).... '.3 Email: G c. '\ - G<... a iSh-LL 0....JTn --<. Name: f() <. K V f) fAZ- Title: 6 wlf/e~ Company Name: 5/f1A (J4f L1/J-e G--JJ;JltJ~eK~Jdf Address: ?3rZIJ~~ S(;e,;!'/ City: J141/fHri ~tate: ;::-LH Zip: 33/ t~ Phone: 7f1? ~'I5,j'~1i Fax: ~f'~?lf77 Em.it: 'I' 475k if. ee.f') ,Co nver ) dV\I'\N Q PU-G- ~(lO- vVo.~~ UNJ.unlleM."-JJ) ~S i/"<:, ;; ~OO ~ v.j \ '0 ~ ~ '~\U~J')~I ten-J. +1 e,\ .s ~ 0 30 60S \ 9'(<.. - L/y/ 'j J e QUWI-f\. e.-vlv\ ~ ~ mOI1\cv\ ~~.'\ ~ -1lr \O~ ~~k~~ l3=L\.G \0\ 0\ 9JJr q EO ~ . 'r{\\ OYy,,; T L ~ l D '7 Q. ~. 7~~. <O19~ '1= - OQ-S'. 2-~ -; . 4~~ ~ ~ los: -+~r10f 0 -tipTop G^T i ""c- ' (!..()W\ (V'Y\.~'V\ ) M f-odtv\lve:c.. f) -nl1l:>~Q..(,{\ IV\C. . <lit) vV\ \ ~E.be '(.. : l~~ -":)~ f>9 - z, l c.:=tt "f1oJ~ . Mandatory Pre-Bid Conference - Sign-In Sheet Bid No. 08-10-01 for SR AlA/Collins Avenue Streetscape Improvements 18070 Collins Avenue, lat Floor Meeting Room. Sunny Isles Beach. FL 33160 Monday, December 1, 2008, 2:00 p.m. Name: ;1-~ d Cl<~ ~ I (e-,Lo Company Name: vi, I ~ . S,:)~ /.+.Nt) S c./,- f ~ "c.. Address: u10 l ...,...,:) l \ ~ 1oJ\.. City: j-A., Jd"l : Title: &rl Phone: ~o$'. ~()>- u~ ~ ~ CD~. State: Ei . Zip: 'S 'J (1. ~ Fax: ~ol"- ior- <.(t."to Email: A<!/t~,.t(/ii.I->@ {/,(*..AJ- ~ . (,p~ Name: ...J.re "4~'" ~"j,.r Company Name: ::;;-~e O"."r,zh..- '})/...V/crf: h-C. Address: 7'~1 N/N 72. Av'''-#Zvo City: /tf~U'7' Phone: <uS- .912 "'1CJ&? (, Fax: 301'-:):1/-1" J" I - Title: j~ ~~~ State: FL Zip: 33 J " f, Emait: jJ,~.,~..f@ Tel>' 11. G?;n Address: ~i\~ ,f-L A-z.G- L If ~A 1 t- bV2..0\JP \ \..L.<... 2..')0 I AJvJ IlftlJ~ity: MlttMI State: F L Zip: 311;;l3- 3c1{" ..~ I " -O)~L/ Fax: 305"- 5-9 ~.~3E1ait: ~~ ~iAMJ.ltl tlrNf. Title: ----P~ . Name: Company Name: Phone: ,,"" Name: ~ f;a{(I~ Company Name: e JJIIl~I.I.:II..C~ Address: 4- 5,E / ~/I Phone: ~O.5) 79f/J -9351 Title: b'. J \ tA.f ~(Vlce. C,,~~ . City: ~~(!]I State: r=-t.. Zip: 33/ J / Fax:l.s~~ &'.3 7 -&Ioot, Emait: ...... Name:P . \.1td~~ Company Name: ~O ~~Tf..tl)c..Tlt:l~ ~\Lp. Address: 3. <2> s s eo ~.U.)~Qt:> ThiA City: LA I ~~" (2. Phone: 3Ps g ~.t 3<\ )..:2- Fax: 3c.'3 q 44 oo~ 7 Title: State: l=' l Zip: "3 2. 0.2.5 Email: ~\ D T(:)wI ~ S"ol.O ~ ~1 cnoV. ~ Name: "Hotl.fit$ WEEtL!:."').i. Title: A201&T u.~/"rl:tEL Company Name: ~MI\AI1""1"'( A-..v~1" CoLt' Fax: ~c-B'2-q - en--.rz Emall: R- Zip: $~O if] 'TlNpE-v(i! CA<.ot.P, AJ~ Phone: l'tfJof ~,...., Ifj' A6- <6r ']Dr- eZ~-01-66 City: H I"'~ State: Address: Mandatory Pre-Bid Conference - Sign-In Sheet Bid No. 08-10-01 for SR A1A/Collins Avenue Stteetscape Improvements 18070 Collins Avenue, 10' Floor Meeting Room, Sunny Isles Beach, FL 33160 Monday, December I, 2008, 2:00 p.m. Name: Title: ?~ Zip: '356) \ Phone: Phone: ha./Isd(j , 110 Name: ~/"o C ~ Company Na:: P j L CtJN+yoc...+rovJ Address: I Y111 ~W 4z t:Jv f!u, t-<<. 2o<J)City: f7'},nm' Phone: (305) 2.()1- f~1'1 Fill: (?OS) 20'1- '1110 Title: () W /IILr State: t {~ Zip: '33/1 S- Email: 3"()l.a c. ~ t o..J t.. ~'t >J COM Name: k (Co ~M I MA~/,,J z:. C._pony No.." t/cr; "'f<"": Address: 8'0\ q) 20~~ Phone: '3or8>tCf t/()dJ6 Title: E&-re IL City: 0 D( ~- D "'- Fill: ..fDJ :p/9q2Z? State: 'f:L Zip: "3~1 V- Emall: ;t, /~4! J()dl/~lVfI"dc ~h{, ~O,'l Name: j}1,'cIAt:U..!';;; ~ rei z.. z.,..,cJ Title: s-ltft(,v'~D r Company Name: ~.!-Se...~.!S ~..!Cq~ Address: ;l.,).aJ A/, ~ ~ City: f{p/~'~ State: ;:1 Zip: 330 0( I Phone: tft;t/-t.!J/-I/I( Fax: 1s'"L{-'f33 -lCl~mail:-'\il(t el"'~!i-..sorLv~ ..ss.ho"l. Name: rlO~ ~f\c\ Sons f(\{erfr\J.e~. 11'\<.- Company Name:~\<..hat'> YOf\) Address: ~'aO ~-fJal\~'( AlIe~ City: ~""'^f\11~J~1 State: ~ Zip: "31:./60 Phone: '30 !;. '1 , "I C1 b b ~ Fax: 1 0 s: q f 'I '10 q 6 Email: P i {)J (J bQ 115VJ""- f\ e.f Title: prO)ed A'lGl(l~Jer Mandatory Pre-Bid Conference - Sign-In Sheet Bid No. 08-10-01 for SR AlA/Collins Avenue Stteetscape Improvements 18070 Collins Avenue, lit Floor Meeting Room, Sunny Isles Beach, FL 33160 Monday, December 1, 2008, 2:00 p.m. Name: Titte: .p~-:?b:..r ~~ Company Name: Uf\Jk-. ~5~c..r?,:)~ G~. I . 1 p/l.I V6 ~C.lt r~ 1..( e Address: }QD:] t-J. VJ~ City: H I~ \ State: F-L Zip: "3 3 IS .r O~~S <2 Phone: '3c:{' . b c.s . ~ <B 2.G. Fax::?OJ . 'W- .9 Gf I Email: t,..IN \.c.. c.o.MS'11Wc..:f\A) ~ J.... J Pc::> ( ~lXU-D 5 ,~T N.m" .jolt\')- 0a~ Ti"'~ C.mpa.y N.m" fLd g,e CmsiYlC~O 0 . Co, i' ( n c '" Address: \ 'l4S0 N W .5o.J ivt ~lvlRgty: rn I CU'l1\ State: -=:f::L- Zip: 93/7 f Phone: 215 %83q~~ Fax: 2c5&52cr7ls& Email: . ed e ~ , JStnd) (. Name: .(~ N.m"~tf'~ u~d.C. T...~l?i2rjcJ Y\ANf\~' 1 Company Name: M, \j' j, ? JOe. :1 (y\ C Ad....." l?(fn M L0 ''\'1':''\;. \,< City.:' t. too -I" L. ZJp' ~D I ~ I Phone:~l'1~' fS2 ,. \ 1..- 2- ~ Fax~ ~ . b Lie . CXD4mail: &\~C\/'l d~ {--- M..J I It. t-le+ Title: rp /y Name: d<o,., ::Pt..~ ru- Comp.ny N....Oe t.."/'I'M R ';f- @O "' r~ Address:J- L(,tI N tv J I.P r;: T City: n)'<( pfUiO State: I~ 1.- Zip:? 3 .3 0 Phone: 9 j1tf -Yuo'OI36 Fax: 9.fLI-rleCf'Jr/Lnail:OC//W6nr ~ 1,-fl q -:/J~T Name: vJ/ /116SS Title: ;>wn~ City: State: Fax: tlMjZfl- O/il1 Emait: Mandatory Pre-Bid Conference - Sign-In Sheet Bid No. 08-10-01 for SR AlA/Collins Avenue Streetscape Improvements 18070 Collins Avenue, 1" Floor Meeting Room, Sunny Isles Beach, FL 33160 Monday, December 1, 2008, 2:00 p.m. Name: L~~~6' ti. "~'DO Title: 'II' of5 . Company Name: FLOe, t>A ~ ~~rerr~ , ~ Address: ~ ~W lOt+\ sr City: -'::11 ftN I State: Fe... ZiP:~ Phone: ~.. '2U>'2,.. ~ Fax: ~4?JIf"Sl)5lt Email: v'q! do. '~(..lre()Ci ~(!~( .de Name: J11~v~l 0C/eir-lrO Title: J4:> ~ H 01 /7 c; ~ e...., La{J () 0Jt'?~-Ir~r_..j...~'<,,...., Co oJ Company Name: cp,q g,..,c-bz.II A.....( 100'"C . :> :Sl .3 ( Address: ~ City: 1-11 A I-( 1 State: FL Zip: Phone: 7~6 . 3 '6s - 0 9 -3 V Fax:3o.r- 3 ~ I~ ~ <f'l Email: #1. fI..A!- rr~l'o €l... /<?9 pC c. v ~~~~~~ (""ow\~~~ ~r~ - Name: Title: Company Name: \ FIN t rA. E. IN -I E (l f (t c-'S ~ , ~ c.. Address: ~ <;' 0 <6 \I>J \,\. ~(. City: ?,,-- \I~'I\ ~(?~tate: ~ L Zip: ~~o6Z) Phone: ct s--c\ - '\ ~ ,~\Ol) Fax: q ~ -1 ~_c>C'~ail: -401..""~ ~.cN6' t (5,,11 ttfrt Name: ('7 c' !",--c-",J C c J i J.. ".'':'' Title: ) '-\Jj ( ( l N'~ ."">~ <Lr ----., C ' / I ,. C'\ if Company Name: IG~e../ .~:J -""'.i,~ 1" t' "'.....J"- ..,- : ) "...j - '" ..... "'-..j' I ~-. ~ ('i iL- I tJ. . '?: r-' - , +: / Address: IL c;-"S' fVVv ( ,.' City: State: Zip: "3' ) \y," G . ' Phone: '3<15"- 1/8- ~.o(<J, Fax: Emall: <J 1: t. .~ ; ( I . C (>oJ .L~ -fJ ~ ~'fG.: ro.J 1-",-, <. ./-'':J........ :.0",-< Name: f;)1Jf ~~t" Title: ffill1AJ 11 r1- companYName:~vztol;{&J7 N'J) OoHI-I. 0A-Ou(J d- ~M'M Address: qo1J M !~ w .1 (06 City: I1f rfr0 State: ::r<- Zip: 33 n {:, Phone: ~r.- J/6 - D6 ( f Fax: ~'-- J16 06 I~/ Email: YlHJ l~fv~l;::.(?WE'\I\1 fL ( ~ Name: \ -'AQ.~:. M. biL ~ M G~ Title: ~I~\ NtIP1\ L Company Name: PtGC) "INC' NW ~\ s.~. -- FL. Address: \O'MS City: \ )OLi'll State: Zip: ~31 L~ Phone: (3(')~\ 592 -1'2.. ~:) Fax: (10S\ S'1~ ~'S 't ~ Email: LW\aile A~ (n-. CO'" c;.IIl. ~ Cc:J-, tS'~,( A-fJ0 [SrJD VV'13 EXTRA-DUTY RATES Sunny Isles Beach Police Department Effective Date: Apri/1, 2008 Police Officer $48.00 per hour The fee covers the payment to the officers in addition to mandatory cost of workmen's compensation, contributions to the Florida Retirement System, Medicare, social security and other administrative fees. Police Supervisor $52.00 per hour 3 or more officers require a supervisor or designated supervisor. The fee covers the payment to the officers in addition to mandatory cost of workmen's compensation, contributions to the Florida Retirement System, Medicare, social security and other administrative fees, Any Extra Duty details that fall on a city observed holiday will be billed at the rate of $72.00 per hour. The following is a list of the observed holidays. New Years Day Martin Luther King's Birthday Presidents Day Memorial Day Independence Day Labor Day Veterans Day Thanksgiving Day Day after Thanksgiving Christmas Day AII requests for Extra-Duty Officers must be in writing and FAXED to 305-792-1583, not less then seven working days before the event. Please note requests I cancellations for Extra Duty officers are only accepted Monday through Friday from 0700-1530 hrs. A Cancellation fee of 3 hours will be charged on all jobs not cancelled 8 hours prior to the start time of the detail. There is a 3 hour minimum on all details. Payment Terms: For single day details, payments must be paid in advance for the entire detail term. Payments must be in form of: Personal/Certified / Cashiers Check or Money Order. All payments should be received at least 5 days in advance unless other arrangements are agreed upon. ALL CHECKS SHOULD BE PAYABLE TO: The City of Sunny Isles Beach All jobs will be assigned an invoice number by the extra-duty coordinator and the invoice number should be noted on the check upon making payment to assure accurate accounting. Any questions please contact Sandra Block 305-792-1839 sblock@sibfl.net Addendum No.4 CITY OF SUNNY ISLES BEACH Collins Avenue Streetscape CITY BID NO. 08-10-01 Bidders are required to acknowledge receipt of the ADDENDUM on Page 39, Section 7 of the Bid Specifications. Failure to do so may cause the bid to be considered non- responsive and subject to rejection. Please take notice of the following revisions, clarifications or additional information on the above referenced project. 1. Lighting Plans: Sheet L-13 (Lighting Details) is revised to include the following: The metal light poles shall include a frangible coupling inside the pole base. 2. Bid Form Section 7.6 - The Unit Price is to include all labor, taxes, overhead and profit for each Bid Item. 3. Landscape Plans: Sheet LD-5 (Plant Schedule): The quantity of Phoenix dactylifera 'Medjool' Date Palm should be revised to read (35). 4. Bid Opening date and time remain the same: Monday. December 8. 2008 at 11 :30 a.m. END OF SECTION pj~~ 'I Y -:~'~A "lI..._.... I ..,-.~.<<h'>..:-...;<{~.,,\ I~'~ \.?\ 1-' 101', :"'1 I' I.. I I'P I I ... . I: I I ::~\~:=~:~1;%~ -./ ~-':'~~""''''''''-I'''' .. .... v - S ,..... .. Answers to Questions Submitted after Pre-Bid Conference Question from Arazoza Brothers. Corp.: 1. I was reviewing the quantities on the bid schedule versus the plans and found a difference in quantity for the Phoenix roebelinii (Pygmy Date Palm). The bid schedule calls for 20 and the plans show a quantity of 35. Will a new bid schedule be issued or would you like us to just cross it off and correct it? Thank you for your time and have a great day. There are (20) Phoenix roebelinii on the Bid Schedule as well as the plan We do not see the discrepancy. We noticed a typo on one of the plan sheets and have added Item #3 to the Addendum (see pg. 1 of this document). Questions from Vila and Son: 1. Page L-4 Is it necessary to concrete encase boxes that are in grass area what is the dimension of concrete collar? Page L-4, the concrete slab is 5'-0" x 5'-0", per FOOT Standard Index 17500, sheet 2. 2. Page L-16 Are we using spread foundation as shown on our project I all poles are in grass covered areas? Page L -16, all proposed poles have a spread foundation per sheet L -16. The poles are located in the proposed sidewalk. 3. L-5 Note is requiring to remove existing pole. Do we do anything with concrete pole base? Page L-5, the base as well as all salvageable materials are to be delivered to Miami-Dade County Traffic Signals and Signs Division, per general note 9 in sheet L-3. Note that Pay Item 715-4-600, Light Pole Complete (Remove), refers also to the concrete foundation that is to be removed and disposed of properly for all the existing poles removed. 4. L-17 There is not one line diagram for PNL-B it is not clear what is controlling lighting contractors and Manual Disconnect is specified as 100A Circuit breaker and Heavy duty Disconnect. Could we use any of these options for Disconnect? Page L-17, a diagram for the panel will be provided in a plan revision. For bidding purposes, the circuit breaker needs to be rated for 100 amps. Question from VallevCrest Landscapinq Development: 1. RFI clarifying if item # 715-11-119 requires a concrete foundation, I would appreciate it. The pay item note for this item at states "Includes the fixture, luminaire, lamp, ground spike, mounting, foundation and any other material necessary for a finalized installation." Although it states "foundation" there is no detail of any foundation associated with this item. Typically foundation means concrete, but I haven't seen any concrete detail. The decorative light specs do not show a concrete foundation, and it is not needed. Sheet LD-24 shows gravel to be placed around in-ground light fixture. Install per manufacturer's instructions. 2. Is the company that is presenting a bid required to be verified on the State of Florida website and to be listed as a Company General Contractor, or can individual GC's bid on the project? https://www.mvfloridalicense.com/wI11.asp?mode=1 &SID=&brd=&tvp= The company submitting the bid must be registered in the State of Florida as a General Contractor. Question from JAG Liqhtinq Solutions. Inc.: 1. Can you tell me what manufacturer of street light poles and fixtures you are using for this project? Per sheet L-13 of the lighting plans, the pole manufacturer is Spring City Electrical or approved equal. The fixtures are Lumec, model RN20. BID FORM for SR A1A1Collins Avenue Streetscape Improvements (from 187th Street to Wm Lehman Causeway) 08-10-01 NOTE: The quantites shown in this bid form are estimates only! They may vary significantly from the actual quantites. Payments wil be made on the basis of actual quantites placed and accepted by the City. The Bidder, by signing this Bid Form and Contract, fully acknowledges that he/she wil receive no additional compensation (no verhead, no anticpated profits, etc.) other than teh bid unit price of the items times the number of items authrozied, ordered, placed and accepted by the City. SR A1A/Collins Avenue is within FOOT right-of-way, therefore, FOOT Pay Item numebrs are referenced herein. Contractor is to refer to the 2009 FOOT basis of Estimates Handbook for FOOT's standard method of documenting design quantites and measurements. 7.6 Bid Form REF Bid FOOT PAY EST. UNIT ESTIMATED Item ITEM # DESCRIPTION UNIT QTY PRICE TOTAL I. Summary of 0200 Roadway 1 101-1 Mobilization LS 1 $38,304.16 $38,304.16 2 102-1 Maintenance of Traffic LS 1 $26,223.75 $26,223.75 3 102-14 Traffic Control Officer MH 120 $139.86 $16,783.20 4 102-60 Work Zone Signs ED 300 $2.82 $844.99 5 102-74-1 Barricade (Temporary) (Types I, II, VP & ED 2200 $1.01 $2,214.45 DRUM) 6 102-76 Panels Arrow Advance Warning ED 60 $69.93 $4,195.80 7 102-77 High Intensity Flashing Lights (Temp Type B) ED 240 $0.70 $167.83 8 11 0-1-1 Clearing & Grubbing LS 0.47 $11,655.00 $5,477.85 9 110-4 Removal of Exisiting Concrete SY 1148 $6.59 $7,560.60 10 120-1 Excavation Regular CY 252 $19.81 $4,993.00 11 120-6 Embankment CY 308 $34.59 $10,652.67 12 285-704 Base Optional (Base Group 04) SY 1757 $13.69 $24,061.75 13 400-1-15 Conc. Class I (Miscellaneous) CY 0.5 $135.20 $67.60 PAGE 41 OF 130 BID NO. 08-10-01 14 425-6 Valve Boxes (Adjust) EA 3 $582.75 $1,748.25 15 425-5-1 Manhole Utilies (Adjust) EA 1 $874.13 $874.13 16 520-1-10 Curb & Gutter Conc. (Type F) LF 123 $10.49 $1,290.21 17 522-1 Sidewalk Concrete (4" Thick) SY 42 $41.96 $1,762.24 18 522-2 Sidewalk Concrete (6" Thick) SY 12 $65.27 $783.22 19 536-73 Guardrail/Fence Removal LF 705 $11.66 $8,216.78 20 635-1-11 Pull & Junction Boxes (F&I) (Pull Box) EA 15 $582.75 $8,741.25 21 700-48-48 Sign Panels (Relocate) (15 or <) EA 8 $116.55 $932.40 22 711-11-121 Thermoplastic, Standard, White, Solid, 6" LF 62 $11.66 $722.61 23 711-11-221 Thermoplastic, Standard, Yellow, Solid, 6" LF 48 $11.66 $559.44 Subtotal of 0200 Roadway $167,178.151 II. Summary of 0400 - Lighting 24 715-1-12 Conductors, F&I, Insulated, No. 8-6 LF 12744 $1.57 $20,052.43 25 715-1-13 Conductors, F&I, Insulated, NO.4 LF 1580 $2.16 $3,406.76 26 715-2-11 Conduit, (F&I), Underground, PVC Sch 40, LF 3443 $5.65 $19,461.52 (2") 27 715-1-13 Conduit, (F&I), Under Pavement, PVC Sch LF 220 $22.73 $5,000.00 40, (2") 28 715-11-119 Luminaire (F&I), Roadway Special (In-grade EA 70 $1,544.29 $108,100.13 Landscape Light) 29 715-11-119 Luminaire (F&I), Roadway Special (Above- EA 20 $1,416.08 $28,321.65 grade Landscape Light) 30 715-14-12 Pull Box, (F&I), Sidewalk EA 25 $664.34 $16,608.38 31 715-500-1 Pole Cable Distribution System EA 7 $1,575.09 $11,025.63 (Conventional) 32 715-511-140 Lighting Pole Decorative, (F&I), Single Arm, EA 7 $17,453.36 $122,173.54 Alum., 39' 33 715-521-140 Lighting Pole Decorative, (Furnish), Single EA 2 $14,568.75 $29,137.50 Arm, Alum., 39' 34 715-4-600 Light Pole Complete, Remove EA 6 $541.96 $3,251.75 PAGE 42 OF 130 BID NO. 08-10-01 35 715-7-12 Load Center, (F&I), Primary Voltage EA 1 $11,526.80 $11,526.80 Subtotal of 0400 Lighting $378,066.061 III. Summary of 0600 - LandscapelPeripheral 36 570-1-2 Performance Turf, Argentine Bahia Sod on 2" SY 1737 $0.37 $648.02 topsoil bed 37 570-1-2 Performance Turf, St. Augustine 'Floratam' SY 1150 $0.70 $804.20 Sod on 2" topsoil bed Landscape Complete (Large) 28 580-1-2 Aechmea blanchetiana (Blanchetiana EA 198 $48.95 $9,692.30 Bromeliad) 39 580-1-2 Bismarkia nobilis 'Silver select' (Bismark EA 5 $932.40 $4,662.00 Palms) 40 580-1-2 Clusia guttifera (Small Leaf Clusia) EA 344 $35.24 $12,121.20 41 580-1-2 Clusia rosea (Pitch Apple) EA 8 $236.01 $1,888.11 42 580-1-2 Cocos nucifera 'Gr. Malayan (Coconut Palm), EA 14 $1,328.67 $18,601.38 4'-6' wd 43 580-1-2 Cocos nucifera 'Gr. Malayan (Coconut Palm), EA 32 $1,365.09 $43,682.94 10'wd 44 580-1-2 Conocarpus erectus (Green Buttonwood) EA 6 $349.65 $2,097.90 45 580-1-2 Corida sebestena (Orange Geiger) EA 7 $466.20 $3,263.40 46 580-1-2 Crinum 'Quuen Emma', (Q. Emma Crinum) EA 22 $46.62 $1,025.64 47 580-1-2 Deloniz regia (Royal Poinciana) EA 2 $571.10 $1,142.19 48 580-1-2 Ligustrum lucidum (Glossy Privet) EA 9 $541.96 $4,877.62 49 580-1-2 Nerium Oleander 'Calypso' (Oleander Tree) EA 31 $221.45 $6,864.80 Phoneix Dactylifera 'Medjool' (Medjool Date 50 580-1-2 Palm) Furnish, deliver & unload palm on site EA 35 $4,632.86 $162,150.19 only Phoneix Dactylifera 'Medjool' (Medjool Date 51 580-1-2 Palm) - Labor to install Bid Item #51 including EA 35 $2,127.04 $74,446.31 all misc. material (ie: sand, staking, mulch) & clean-up Phoenix Dactyliferia 'medjool' (Medjool Date 52 580-1-2 Palm) - 18 month Warranty only for Bid Item EA 35 $466.20 $16,317.00 #51 PAGE 43 OF 130 BID NO. 08-10-01 53 580-1-2 Phoenix roebelinii (Pygmy Date Palm) EA 20 $215.62 $4,312.35 54 580-1-2 Thrimax radiata (Florida Thatch Palm) EA 19 $349.65 $6,643.35 55 580-1-2 Relocate (3) exisitng Coconut Palms & (3) EA 6 $460.37 $2,762.24 Cabbage Palms 56 580-1-2 Existing tree/shrub removal LS 1 $6,993.00 $6,993.00 57 580-1-2 Fertizlie existing Royal and Foxtail Palms EA 67 $13.99 $937.06 Subtotal of Landscape Complete (Large) $385,933.181 Landscape Compelte (Small) 58 580-1-1 Chrysobalanus icaco 'Red Tip' (Cocoplum) EA 20 $10.49 $209.79 59 580-1-1 Conocarpus erectus 'Sericeus', (Silver EA 8 $10.49 $83.92 Buttonwood) 60 580-1-1 Codiaeum variegatum (Croton) EA 80 $11.66 $932.40 61 580-1-1 Duranta 'Gold Mound' (Gold Mound Duranta) EA 1294 $11.07 $14,327.49 62 580-1-1 Ficus microcarpa 'Green Island' (Green EA 2119 $8.25 $17,482.50 Island Ficus) 63 580-1-1 Ficus pumila (Creeping Fig) EA 10 $3.85 $38.46 64 580-1-1 Euphorbia milii 'Rosy" (Dwarf Crown of EA 132 $11.66 $1,538.46 Thorns) 65 580-1-1 Dianella tasmanica (Blueberry Flaxlily) EA 792 $8.98 $7,109.55 66 580-1-1 Hamelia patens 'Compacta' (Dwarf Firebush) EA 125 $10.49 $1,311.19 67 580-1-1 Ixora 'Nora Grant' (Pink Ixora) EA 40 $10.49 $419.58 68 580-1-1 Schefflera Arboricola 'Trinette' (Dwarf EA 72 $10.49 $755.24 Schefflera) 69 580-1-1 Tradescantia pallida 'Purpurea' (Purple EA 1500 $3.79 $5,681.81 Queen) 70 580-1-1 Tripsacum floridana (Dwarf Fakahatchee EA 890 $6.94 $6,177.15 Grass) Subtotal of Landscape Complete (Small) $56,067.54 71 590-70 Iriigation Complete (SR A1A1Collins Avenue LS 1 $47,644.47 $47,644.47 between 187th S1. & Wm Island Blvd.) PAGE 44 OF 130 BID NO. 08-10-01 72 590-70 73 526-1-2 IV. Irrigation Complete (Intersection of SR A1A/Collins Avenue & Sunny Isles Blvd.) Architectural Pavers on 1 1/2" sand bed including 6" conc. Band. Subtotal of 0600 Landcape LS 1 $8,504.65 SY 1645 $68.74 Contingency Allowance LS 1 $100,000.00 TOTAL BASE BID (Items I thru IV) $8,504.65 $113,075.64 $442,000.721 $100,000.00 $1,256,469.711 IGRAND TOTAL NOTE: The quantites shown in this bid form are estimates only! They may vary significantly from the actual quantites. Payments wil be made on the basis of actual quantites placed and accepted by the City. The Bidder, by signing this Bid Form and Contract, fully acknowledges that he/she wil receive no additional compensation (no overhead, no anticpated profits, etc.) other than the bid unit price of the items times the number of items authrozied, ordered, placed and accepted by the City. Grand Total (based on the estimated quantites) written out in words: $1,256,469.71 . Of.J1!: k 'Wts.-J Xv->o f+V.Nt)~ fr;:-r., SP< 1WJ<.,1j1>.n.J.D" fCVfU-tv~ Dollars and ~:i--lll1. DIVe Cents. ..f7.X'N-f fU I fVC DOCUMENT CONTINUES ON NEXT PAGE PAGE 45 OF 130 BID NO. 08-10-01 SUBMITTED THIS 8 If BIDDER is: AN INDMDUAL DAY OF December .20 08 By (SEAL) Doing business as : Business address Phone No Facsimile No (Individual's Name) If BIDDER is: A PARTNERSHIP By (SEAL) General Partner Business address Phone No Facsimile No (Firm's Name) By If BIDDER is: A CORPORATION Link ConRtrllC"r; em ~re'l11p (Corporation's Name) State of Incorporation: F lor l da Representative Guillermo Fernandez (Name of person Authorized to Sign) Presldent 7003 N. Waterway Drive Miami. FL 3311';1'; 305-665-98?6 Attest: ~ Title Business address Phone No Facsimile No Suite 218 A (President) (Corporate Seal) If BIDDER is: A JOINT VENTURE (Name) (Address) (Name) (Address) (Each joint venture must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.) PAGE 46 Of 130 BID No. 08-10-01 CERTIFICATE OF AUTHORITY (IF CORPORATION) STATE OF Florida COUNlY OF Dade I HEREBY CERTIFY that a meeting of the Board of Directors of the company Link Construction Group a corporation existing under the laws of the State of Florida 20~ the following resolution was duly passed and adopted: . held on December 8 "RESOLVED, that, as President of the Corporation, be and is hereby authorized to execute the Bid dated, December 8 . 20~ , to the City of Sunny Isles Beach and this corporation and that their execution thereof, attested by the Secretary of the Corporation, and with the Corporate Seal affixed, shall be the official act and deed of this Corporation." I further certify that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the corporation this 8 . day of December , 20~. ~-~:~ PAGE 47 Of 130 BID No. 06-10-01 I N/A CERTIFICATE OF AUTHORITY. (IF PARTNERSHIP) STATE OF COUNlY OF I HEREBY CERTIFY that a meeting of the Board of Directors of the a corporation existing under the laws of the State of . held on 20---, the following resolution was duly passed and adopted: "RESOLVED, that, , as of the Partnership, be and is hereby authorized to execute the Bid dated, 20 , to the City of Sunny Isles Beach and this partnership and that their execution thereof, attested by the shall be the official act and deed of this Partnership." I further certify that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand this , day of _,20 Secretary: (SEAL) PAGE '18 Of 130 13m No. 08-10-01 IN/A I CERTIFICATE OF AUTHORITY (IF JOINT VENTURE) STATE OF COUNlY OF I HEREBY CERTIFY that a meeting of the Principals of the , held on December a corporation existing under the laws of the State of 20----J the following resolution was duly passed and adopted: "RESOLVED, that, as of the Joint Venture be and is hereby authorized to execute the Bid dated, 20----J to the Oty of Sunny Isles Beach official act and deed of this Joint Venture." I further certify that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand this , day of 20_. Secretary: (SEAL) END OF SECTION PAGE '19 Of 130 BID No. 08-10-01 THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document 1\310 BID BOND KNOWALLMENBYTHESEPRESENTS,thatwe Ji2f!;d $~7aeM~~~ ~, as Principal, hereinafter called the Principal, and Hartford Fire Insurance Company a corporation duly organized under the laws of the State of Connecticut as Surety, hereinafter called the Surety, are held and firmly bound unto The City of Sunny Isles Beach as Obligee, hereinafter called the Obligee, in the sum of Five Percent of Amount Bid Dollars (5%) for the payment of which sum well and truly to be made, the said Principal and the Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for SR AM/Collins Avenue Streetscape Improvements; Project No. 08-10-01 NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 8th day of December, 2008. ,((jJ - - (Witness) Inc. (Secrl) (Title) ~.~ Charles D. Nielson, Attorney-in-Fact and Florida Resident Agent Printed in cooperation with the American Institute of Architects (AlA) by CANF&D . CANF&D vouches that the language in this document conforms exactly to the language used in AlA Document A310 Bid Bond. AlA, February 1970 ED. THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE, NW, WASHINGTON. D. C. 20006. POWER OF ATTORNEY Direct Inquiries/Claims to: THE HARTFORD BOND, T-4 P.O. BOX 2103,690 ASYLUM AVENUE HARTFORD, CONNECTICUT 06115 call: 888-266-3488 or fax: 860-757-5835 Agency Code: 21-229752 (NOW ALL PERSONS BY THESE PRESENTS THAT: CK:J Hartford Fire Insurance Company, a corporation duly organized under the laws ofthe State of Connecticut CK:J Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana CK:J Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut c:::=J Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut c:::=J Twin City Fire Insurance Company, a corporation duly organized under the laws of the State ofIndiana c:::=J Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois c:::=J Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State ofIndiana c:::=J Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collective'y referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited: Charles J. Nielson, Mary C. Aceves, Warren Alter, Charles D. Nielson, Joseph Penichet Nielson, David R. Hoover of Miami, FL their true and lawfu' Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by [81, and to execute, seal and acknow'edge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Reso'ution of the Board of Directors of the Companies on January 22, 2004 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, du'y attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures app'ied to this Power of Attorney. I!tt'~ ~ ~ I ~....~ li(~);' If;''''''':.....'l~) ,f ~ V,\ 187'11"fi '~;'\JII7?fJ.)I.f'1 19'. ...'-. ....>.~......-: .......eo ~~ ..~..~ ,"s "'/ J'lL.,Ql'\ '''.no.'' ~.:.~. f Cu..;O Ct. ~ ~~ Pau' A. Bergenholtz, Assistant Secretary M. Ross Fisher, Assistant Vice President STATE OF CONNECTICUT} 55. Hartford COUNTY OF HARTFORD On this 1st day of February, 2004, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the sea's of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. hc.::trP g Scott E. Paseka Notary Public CERTIFICATE My Commission Expires October 31,2012 " the undersigned, Assistant Vice President of the Companies, DO HEREBY CERT'FY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of December 8, 2008. Signed and sealed at the City of Hartford. I!tt'~~ ~... ..... ~'....'l. ~ ~_ I;!, _.."......_, . ~ Cl ", . ;-1:: -r- _ ~i~i ~~ .. \.!,~..,.I87'./..il '~~\.tIl7?fJ.)t[\ 19'. ,...tl......... .toi ~~\; .~ -"/ 'lU,1iII1'\ '''.t". ~:.~. (ryf~f Gary W. Stumper, Assistant Vice President J. NIELSON, ALTER & ASSOCIATES NCI NIElSON & CoMPANY, INC. THERE IS A DIFFERENCE... December 5, 2008 The City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RE: Link Construction Groull' Ine. SRAtA/Collins Avenue Streetscape (from 18?h Street to William Lehman Causeway); ITB No. 08-10-01 Gentlemen: Please be advised that we are the bonding agents for Link Construction Group, Ine. We have had the privilege of providing Bid, Performance and Payment Bonds for them since 2001. Link Construction Group, Inc. is bonded through Hartford Fire Insurance Company and has a substantial bond line of credit of $30,000,000 for single projects and an aggregate bond line of $60)000,000. Link Construction Group has successfully completed all of their projects that we have bonded in a very satisfactory and professional manner and have never received any issues from the owners, subcontractors or suppliers and L'1e-i have an excellent reputation in the construction industry. We are very confident of their integrity and abilities and once again, would extend our utmost recommendation on their behalf. We consider them to be among our finest clients and hold them in the highest regard. Naturally, any bonds that are issued will be based upon acceptable contract terms as well as normal and standard underwriting criteria at the time of request H we can provide any other assurance or assistance) please feel free to give us a call. Thank you. Very truly yours, Ckw-o~ Charles D. Nielson, Attorney~in-Fact CDN:glm PROVIDING BONDS FOR THE CONSTRUCTION INDUSTRY 8000 GOVERNORS SQUARE BI.VD. . SUITE 101 . MIAMI LAKES, FL 33016 . DADE: 1800-557-2663 (BOND) PHONE: (305) 722-2663 (BOND) . FAX: (305) 558-9650 WWW.NIELSONBONDS.COM See attached Bid Bond I SECTION 8 BID BOND STATE OF FLORIDA ) ) COUNTY OF ) KNOW AlL MEN BY THESE PRESENTS, that we, as Principal, and . as Surety, are held and firmly bound unto the City of Sunny Isles Beach, a municipal corporation of the State of Rorida in the sum of Dollars ($ ), lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these presents. THE CONDmON OF THIS OBUGATION IS SUCH that whereas the Principal has submitted the accompanying Bid dated, 2008 for: WHEREAS, it was a condition precedent to the submission of said Bid that a cashier's check or Bid Bond in the amount of five percent (5%) of the Base Bid be submitted with said Bid as a guarantee that the Bidder would, if awarded the Contract, enter into a written Contract with the City for the performance of said Contract, within ten (10) consecutive calendar days after written notice having been given of the Award of the Contract. NOW, THEREFORE, the conditions of this obligation are such that if the Principal within ten (10) consecutive calendar days after written notice of such acceptance, enters into a written Contract with the City of Sunny Isles Beach and furnishes the Performance and Payment Bonds, satisfactory to the City, each in an amount equal to one hundred percent (100%) of the Contract Price, and provides all required Certificates of Insurance, then this obligation shall be void; otherwise the sum herein stated shall be due and payable to the City of Sunny Isles Beach and the Surety herein agrees to pay said sum immediately, upon demand of the City, in good and lawful money of the United States of America, as liquidated damages for failure thereof of said Principal. IN WITNESS WHEREOF, the above bonded parties have executed this instrument under their several seals this day of ,20 . the name and the corporate seal of each corporate party being hereto affIXed and these presents being duly signed by its undersigned representative. DOCUMENT CONTINUES ON NEXT PAGE PAGE 50 Of 130 BID No. 08-10-01 I Please see attached Bid Bondi IN PRESENCE OF: Individual or Partnership Principal Affix Corporate Seal Business Address City, State, and Zip Code Business Telephone Business Facsimile ATTEST: Secretary (Corporate Surety)* By: *Impress Corporate Seal IMPORTANT Surety companies executing bonds must appear on the Treasury Department's most current list (circular 570 as amended) and be authorized to transact business in the State of Florida. END OF SEmON PAGE 51 OF 130 BID No. 08-10-01 ACfJllQM CERTIFICATE OF LIABILITY INSURANCE I DATE (MM/DDIYYYY) 12/05/2008 PRODUCER (05)822-7800 FAX THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Collinsworth, Alter, Fowler, Dowling & French ONL Y AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P. O. Box 9315 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Miami Lakes, FL 33014-9315 INSURERS AFFORDING COVERAGE NAIC# INSURED link Construction Group, Inc. INSURER A: Amerisure Mutual Ins Co 23396 7003 N. Waterway Drive INSURER B: Amerisure Insurance Co 19488 Ste. 218 INSURER C: Zurich (American Guarantee & lia ) Miami, Fl 33155 INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. II~f: ~~~~ TYPE OF INSURANCE POI.ICY NUMBER POUCY EFFECTIVE "gk!fJ EXPIRATION I.IMITS GENERAL I.IABll.ITY Gl2031180 08/08/2008 08/08/2009 EACH OCCURRENCE $ l,OOO,OOC I-- X COMMERCIAl. GENERAL l.IABILlT'8 LANKET ADDITIONAL INSD DAMAGE TO ~~~~;~nn~\ $ 300,00C I Cl.AIMS MADE [!] occuI\ REQUIRED BY CONTRACT MED EXP (Anyone person) $ 10,OOC A X XCU NOT EXCl PER ENDT CG7049 PERSONAL & ADV INJURY $ 1,000,00C rx CONTRACTUAL lIAB BLANKET WAIVER OF GENERAL AGGREGATE $ 2,OOO,OOC I-- SUBROGATION PER ENDT 2,000,OOC GEN'L AGGREGATE l.IMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ ~ POLICY rxl j~8T n LOC CG7048 AUTOMOBII.E I.IABll.ITY CA2047609 08/08/2008 08/08/2009 COMBINED SINGLE l.IMIT X (Ea accidenl) $ l,OOO,OOC ANY AUTO - ALL OWNED AUTOS BLANKET ADDITIONAL BODILY INJURY - (Per person) $ SCHEDUI.ED AUTOS INSD AS REQUIRED BY B X CONTRACT PER ENDT HIRED AUTOS BODILY INJURY - $ X NON-OWNED AUTOS CA71151204 (Per accidenl) I-- PROPERTY DAMAGE $ (Per accidenl) GARAGE l.IABll.ITY AUTO ONLY - EAACCIDENT $ =i ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/UMBREI.l.A l.IABILITY AUC9672553-00 08/08/2008 08/08/2009 EACH OCCURRENCE $ 4,000,OO(] o OCCUR D Cl.AIMS MADE AGGREGATE $ C FOllOW-FORM $ 4,OOO,OO(] ~ DEDUCTIBLE $ RETENTION $ $ WORKERS COMPENSATION AND WC2031181 08/08/2008 08/08/2009 X I WC STATU- I IOJ~. EMPI.OYERS' l.IABll.ITY BLANKET WAIVER OF l,OOO,OO(] B ANY PROPRIETORlPARTNERIEXECUTIVE EL EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? SUBROGATION PER ENDT E.L DISEASE - EA EMPLOYEE $ l,OOO,OOC If yes, describe under WCOO0313 1,000,OO(] SPECIAL PROVISIONS below EL DISEASE - POLICY l.IMIT $ OTH~R 08/08/2008 08/08/2009 $75,000 limit Buslness Personal A Property - Special CF2031179 Ded- $1,000 AOP/5% Wind & Hail Form ~~ESCRIPTlON OF OPERATIONS II.OCATlONS I VEHICI.ES I EXCI.USIONS ADDED BY ENDORSEMENT I SPECIAl. PROVISIONS e: SR AlA/Collins Avenue Streetscape (from 187th Street to William lehman Causeway) ITB No. 08-10-01 ity of Sunny Isles Beach shall be named additional insured when project is awarded. City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Fl 33160 SHOUI.D ANY OF THE ABOVE DESCRIBED POI.ICIES BE CANCELLEO BEFORE THE EXPIRATION OATE THEREOF, THE ISSUING INSURER W1I.L ENOEAVOR TO MAIl. ~ OAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE I.EFT, BUT FAIl.URE TO MAIl. SUCH NOTICE SHALL IMPOSE NO OBI.IGATION OR I.IABll.ITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE Michael Nielson/ROSIEG ACORD 25 (2001/08) @ACORDCORPORATION 1988 IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD 25 (2001/08) ft~ < COD!ltrUrtiOD group f~r 38-994'91 - STATE OF FLORIDA OBPAR .,. BS '8" PROP 5 L REGtlLATIOH ~. . . ~~::~aY L<~mli~ aoAaD SEQh.....701... '1 ~~om~o. I I The aan:RAL CONTRACTOR l !famed below IS CIJtTI:rDlD Under the provi81osu. of Cbap>ter ." ,"S. Expiration date: AVO 31, 2010 IV 'V .... ~ JiI:o -v d V CERRA MIGUEL ANGBL LDU: CONSTRUCTION OROVi' 7003 H WATERMAY DR APT 218 MLAKI PL 33155 CllARLIS CRiST QOVEJlNOR olePlAYASREQUIRED BY LAW CBARLJ!lS W. DRAGO S:lCBKTARY PI,' 3 902 329 STAll: OF flORIDA O&PARTMEN'l" Or1WSIftS8'.~ PROPZSSIONAL REGULATION i . CC*STJW~oarIJIDUSTJtY LICBNSING BOARD SEal L08010l0172t _LlCElfSI.!!Jl'" . I r 08/08/2008 10118025804 tCOCOS9Sf5 . .... . .. The GEl'BRAL C'OlfTRACTOR Hamed below IS CBRTIFIBD Under the provi.1on8 of Chapter ~Bl rs. Expiration date: ADO 31. 20io " r~=iTR~t::~~OUP .DlC 7003 NORTH WATERWAY DR 1218 SUITE 218 MIAMI PL 33155 CItAltLXB C1U:ST OOVDNOR CHARLIS "'. OUOO SECRftARY OISPLAY ASREQUIREO BY LAW j N:.I 3331 7 86 STATE OF FLORIDA I DEPU'l'II:IIft' O. B08DlKBS >>11), PRO'USZOlfAL UcmLATIOH I . . eoNS'1'RI7CTrOH IHD11S'RYLIClHSJ:NG aOAJtD SEQlLo7oeU003?O I =::3:a I The BlfSmuS ORCII.RZZA'l'IOJI1 ! N...a below IS QUU.IPIED under ~heprovi.iou. of Cb*pt.~ ~89 PS. ~ir.tion d.te. ADO 31, 2009 {".rillS IS 1101' A LIeDBI 'l'O PIRJIOIlM WOK. '1'IlIS ALLOWS COIIPAHY 1'0 DO BVSDalSS OHLT IF I" BAS I. QVALIJ'ID.l . LINit COJISTltJCTIOB GROUP tHe 7003 .. WAT1IJUfAYDI. IT!: 218 MIAMI 7L 33155 caARLIB CJtIST QOVE1UfaI. DISPLAY AS REQUIRED BY LAW BOLLY BENSON SECRETARY I .,.. ~ ....",,, "'.. h" II -, ' . . . , . .. ~ ~~_ ' ~ n . . __ . ...... ~ . I' ' , NISf.cuss . u.i.. POSr. .'. MIJ.' '.^ ....;c.. pERlilf"Ip' 460498-8 Bltf._.' 7003 M .,A 33155 uNta J!iJS l:f. N,QX ,A_,)y...oo NOT poly , RENEWAL o . ' .' ...... . '18767"'4 5!'~FlAt~'.20 ~ CONS . ~"".18. ==:~Yli." DO....O" m.. ;; =-'to .., E"~- .::..~.~ "'t.i'!Sw.:~ fll~~~ -=-~* -,:,~ "OIl7:t~OI -;..-:-..'p DO NOT FORWARD LINk CONSTRUCTION GROUP tHe GUILLERMO FERNANDEZ PRES 7003 N WATERWAV DR STe .218 MIAMI FL 33155 j 11/111111'111/1,11' Ilill filii I i 111.1, i 1.1 J I t J I f II,'" j 1.1 tid i1~ ,~ ( COD!ltrurtiOD group '" . 41 "".. "" , SECTION 9 BIDDER QUAUFICATION STATEMENT The Bidder's response to this questionnaire will be utilized as part of the Oty's overall Bid Evaluation and Contractor selection. The undersigned guarantees, by signature, the truth and accuracy of all statements and the answers contained herein. 9.1. Please describe your company in detail, and submit company brochure, if applicable. Please see tab Item 9.1-LCG Company Brochure 9.2. The address of the principal place of business is: Please see tab item 9.2-LCG Address (Map Showing LCG, City and Streetscape Location) 9.3. Company telephone number: 305-665-9826 9.4. Number of full time employees: 38 9.5. Number of employees assigned to this project: 5 9.6. Company's Identification Number(s) for the Internal Revenue Service: 651103903 9.7. Miami-Dade County and Oty of Sunny Isles Beach Occupational License Number(s): Please see attached Miami Dade County License,tab Item 9.7-Licences City of Sunny Isles Beach Occupational License to be provided upon award. HOw many years has your organization been in business? 9.8. 7 1/2 q.<=t ~ What similar engagements is your company presently working on? If none, write "none". Please see tab item 9.13-Similar Ongoing Projects PAGE 52 OF 130 BID No. 08-10-01 9.10. Have you ever failed to complete any work awarded to you? If so, where and why? No 9.11. Number of similar Projects with a contract price of $1,000,000.00: a. In the past 5 years Please see tab Item 9.11-Similar Completed Projects On Schedule Original contract price overrun average % b. In the past 10 years On Schedule Original contract price overrun average % 9.12. Ust last (3) completed Projects with a contract price in excess of $1,000,000.00. PROJECT 1: Project Name/Location Please see tab Item 9.11 Similar Completed Projects Owner Name Contact Person{felephone No. Original Contract Completion Time (Days) Original Contract Completion Date Actual Contract Completion Date Original Contract Price Actual Contract Price PROJECT 2: Project Name/Location Please see tab Item 9.11 Similar Completed Projects Owner Name Contact Person{felephone No. Original Contract Completion Time (Days) Original Contract Completion Date Actual Contract Completion Date Original Contract Price Actual Contract Price PAGE S3 OF 130 BiD No. 08-10-01 PROJECT 3: Project Name/Location Please see tab Item 9.11 Similar Completed Projects Owner Name Contact Person{felephone No. Original Contract Completion Time (Days) Original Contract Completion Date Actual Contract Completion Date Original Contract Price Actual Contract Price 9.13 List the following information concerning all contracts in progress as of the date of submission of this Bid in excess of $300,000. (In case of joint venture, list the information for all joint ventures.) If none, write "none". Total Contracted Percentage Project Owner Contract Date of of Name Value Completion Completion (to date) Please see Item 9 13 -Ongoing Pl ojects 9.14. Has the Bidder or his/her representative inspected the project site; and does the Bidder have a complete plan for its performance? Yes, Manny Fernandez, Link Construction Group, Chief Estimator, visited the site along with the Project Manager and we have a complete plan of execution. 9.15. Will you Sub-Contract any part of thiS work? Yes. If so, give details including a list of each Sub-Contractor that will perform work and the work that will be performed by each Sub-Contractor. PAGE S4 OF 130 BID No. 08-10-01 Classification of Work Name and Address of Sub-Contractor Please SE e tab Item 9.1S-List of sub-Contractors If, prior to Notice of the Award, the City or the Consultant has reasonable objection to and refuses to accept any Supplier, person or organization listed, the Bidder may, prior to Notice of Award, submit an acceptable substitute without an increase in their bid price. 9.16. Attach the following information to the Bid: Please see tab item 9.16-Proposed Project Team (organizational chart and resumes) 9.16.1 9.16.2 9.16.3 Contractor's home office Organization Chart Contractor's proposed Organization Chart Resumes of proposed key project personnel, including on-site superintendent 9.17. List and/or describe any: 9.17.1 Current status of all licenses: Please see tab item 9.7-Copy of Licenses 9.17.2 Any discipline taken against licenses: N/A 9.17.3 Any instances where company has been investigated or discipline by the Occupational Safety and Health Administration (OSHA): N/A 9.17.4 Complaints filed against the National Labor Review Board (NLRB) or the Equal Employment Opportunities Commission (EEOC): N/A PAGE 55 OF 130 8m No. 08-10-01 9.17.5 Suspension of contracts or debarring from bidding by any public agency brought against the Bidder in the last (5) years: N/A 9.18. State the true, exact, correct and complete name of the partnership, corporation or trade name under which you do business and the address of the place of business. (If a corporation, state the name of the president and secretary. If a partnership, state the names of all partners. If a trade name, state the names of the individuals who do business under the trade name.) Please see tab item 9.2 for address 9.18.1. Correct name of the Bidders is: Link Construction Group 9.18.2. The business is a (Sole Proprietorship) (Partnership) (corporation). Corporation 9.18.3. The names of the corporate officers, or partners, or individuals doing business under a trade name, are as follows: Guillermo Fernandez, President Miguel Cerra, Vice President 9.18.4. list all organizations which were predecessors to Bidder or in which the principals or officers of the Bidder were principals or officers. If none, write "none". N/A 9.19. List and describe all bankruptcy petitions (voluntary or involuntary) which have been filed by or against the Bidder, its parent or subsidiaries or predecessor organizations during the past five (5) years. Include in the description the disposition of each petition. If none, write "none". N/A 9.20. List and describe all successful Bid, Performance or Payment Bond claims made to your surety(ies) during the last three (3) years. The list and descriptions should include claims against the bond of the Bidder and its predecessor organization(s). If none, write "none". ~(tK\- P~SbC ~ I~ ~ t'1-0 1=t/^-.- h~6kL5~T ~ ~J 9.21. List all claims, arbitrations, administrative hearings and lawsuits brought by or against the Bidder or its predecessor organization(s) during the last three (3) years. The list shall include all case names; case, arbitration or hearing identification numbers; the name of the project. If none, write "none". N/A PAGE 56 OF 130 BID No. 08-10-01 DOCUMENT CONTINUES ON NEXT PAGE Dated this 8th day of December ,2007. ~ Guillermo Fernandez Print Name President Title The foregoinjl instrument was acknowledged before me this ~ day of December 20.-2.L by ti::?(.)/~ ~~t.{ . (AFFIX NOTARY STAMP HERE) &L N~~Y PUBLIC-STATE OF FLORIDA lAzi.'-' Orlando Ceballos Jr. \~ j Co~mission # DD70841i ',,'.......'. Expires: OCT. 07, 2011 BONDED THRU ATLMmC BONDING CO., INC, Notary Public - State of Florida D{}JAr-'l~ C)~~f Print or Type Commissioned Name Personally Known ~ OR Produced Identification ; Type of Identification Produced END OF SECTION PAGE 57 OF 130 BID No. 08-10-01 rr~ .1'1 ....... . < con!i1:rUction group Link Construction Group 7003 N. Waterway Drive Suite #218 Miami, FL 33155 II. 11 It \i il h 1\ I: I( T8 .-jrr~ ~,-- --=,,,,,,.,,..1 \,..... , Sf i )>0 , 'Iii ' I h~ ( con!JI:rUcl:ion group [r'f ~ 859491 . STATE OFfLORIDA \ . DBPAll. P BUS S . PROP 8 . L RE~TIOH \ . . ~.~;~",y L<~li~ BOARD SEll.......7.,... , '1 ~=.!~:. J II The m::rBRAL CON'Tl\ACTOR ..alDed below 'IS CltltT1PDD und.~ the provia1one of Chapt.r 48' FS. Bxpi~.tlop date: AUG 31, 2010 CBUA MIGUEL ANGEL LUK ~ONSTRUCT1OH GIlOVl' 7003 H WATE~Y DR APT 218 M~ p~ 33155 CKARLIt CllS'!' QOV'&1lNOR CBARLBS ". DRAGO SECllrrAllY DI8F'lAY /AS REQUIRED BY LAW _ .._~,..T:>"...~~- flf., ~902329 ITATEOFflORtDA DBPAJtTlmN'1" OP llUS.IHEIS.um PROn9SIONAL REGULA'rrOR _uCOHsnoerIOWUIDQ.TJlY LtCBNS~H(J BauD SEQlLoeOIOlOl1at _~I~~i.IL'.._==:J [9Ilo.l200& ~,&02saO' ~~SS5 :-=-i Tbe GBNtRAL COlf"1'B,ACTOlt . RUled below IS ClUIrXBD UDder the p~ovi.1OD. of Chapter .8' FS. ZX;piration date: Ava 31. 2010 ' t~g=~T=~~OUP1:NC 7003 JIOAm WATRRJfAY DR .218 SUI.'!'!: 21B MIAMI PL 33155 CB.J.RLtB axST GOV:I.RNOR CKARLBS w. J)JWJO SECItftUT D48PLAY AS RfQUlRED BY LAW _ ..........;....L.O ,._.,. :.,.""'-.__........---.-...,.-.....--'.. N:.I 3331 7 86 STATE OF FLORIDA DIPD'I'JI:IIr.r or 1I08DiUS 1lHD PltOrllSS1:OXA'L UCWLATIOH CONS"1'R11CTIOtf tHDUSTKY LtCBNSING 8OAJU) 8EQtLo'O.Ot003'70 :::~~ - The Inf.DU'OIlQAB'XU'1'Zaa Nuut4 "lOW IS Q'lJALIFIBD under th. proviaio~ of Cbapt.~ ..9 P8. J;Jl:;piw:aU= datet 100 31, 2009 (518 IS Jf01' A t.ICDfSI TO PluoaM WOK. TRIS ALLOWS COIIPAlft ro DO BOBI:HBBS om.T IF tt HAS A QUALIFIeR.) LtNJt COJISTRtfCTIOW OJlQtJ'P INC 7003 . ltATBJUrAY DR SD 218 JaAIII l"L 33155 CBAaLtB 0.1 ST OOVJ:1UfOJt ~1~~~~~~EQUlI!El? BY LAW ROLIIY BENSOR SECRETAlY _____1 DO NOT FORWARD LINK CONSTRUCTION GROUP INe GUILLERMO FERNANDEZ PRES 7003 N WATERWAV DR STE .218 MIAMI Fl 33155 j 1./li i ,II. I. I t J. J lilli, i I J ,Ill j I , i II ,i III J , , Ii f 11,1, , j, a. ii" ;'.: tl FORM NO. 401.28OlAC2$-061 RV200835367 (RVv. 3Ill8) BOllrd of COU!1tYCommi..toller.. '~rd Cqu!ItY. Florid. BR()WARD COUNTY lOCAL BUSINESS tAX ReCEIPT FOR PERIOD OCTOBER 1. 2008 THRU SEPTEMBER 30. 2009 a RENEWAL a TRANSFIiR see # 'ii' / 1 :,\ 0 .' tAX' BACk TAX PEIlALTY T.C, FEE "I'RANlll'ER ':.;, . f ': ' P r1ES1F! PAlB OCT. .1~' NeW. .1$% . DEC.. _ . ,.. Dl;C. :t1 . ~5% . P1u1 T"'Collllc~ File Of ~1O U~,()~ ~,OIl Cb$lofau.;nesa Tax IfP8id O,{I'~'.~ ~.''!!l*30. r"1o-1 ~: ~ ~~;, ;:r~ " ~ ~: ~,;. ~,C, ~,~i~ f~~~'~~~~ ..~~ ::!.~. ~, ~~ ;i..... ~ 2~ cf:, ". Q NeW DATE.:BlJSINESS,OPSNEO. ,O;~ )' ;,: 0 /" n 8 STATEORCOUNTYCERT~EG '~Iu.rl"'.~ . -, - Bu.......l.oC:etion~: . ..' . ..' or .. L' " f'O", N \"A: rf':"yAY j,r,' ~, ,f,fji C;-q!~'J':"l:"" '. ",.~:. ~U:~Jh!r'::,~j '; ;{IN[: ~ ~-'!j-", Lq:'t~-' -'I::'"' 1""" TOlltl ;::..... (P'i r- THIS ReCEIPT MlIs.TBSG$N$PICUQ\;J$~Y DISP~Y&I) TO PlIBL.lC VIIiW,.,j; ~ LO(jA,rjONAli)Ji)~~$AQQYe. . - ., L J 1'~L ,~.~'.:' '! PULl 1 t)N [~i~l(j\ n' c [ t,.;."/", M:. <~.: 1::::: ..::, 1!~(.;";'l '7(10 t: \,.I(,1I"I:\'('.'j t;h' :I~ H ~JAnJ ~L ~1~IS '- TYPE OF BUSINESS TAX (:lAltl fNEPftj. cot,l rr"rCI rm 1. Ur\.~:::Tb ~_'tI.~a,f). PAYMiJIlTR1EcefilEON;.\t,e,LloATED~VE -sa: tN,TRUCTIQHS ON REVERSE SlOE !li;f "y.nlJ~ . ~(:in;fiUU(y} fJODD[)O~'700 O(J000011.i(JOOOS1"1''!' 10D1 7 ~~ I l n < COD!lUUttiOD group Wate Tvpe of Proiect: 6,000 Sq. Ft. Community Center 4,800 Sq. Ft. commercial swimming pool and 325 Sq. Ft. toddler pool Delivery Method: Negotiated Owner: Lennar Land Development c/o Mr. Rey Melendi Architect: Oliva Meoz Architects Mr. Hector Oliva-Princpal Malibu Bay Reer.. Tvpe of Proiect: 11,000 Sq. Ft. Community Center-Including a gym area, reception hall , 5,000 SF commercial swimming pool and 425 Sq. Ft. toddler pool Delivery Method: Negotiated Owner: Lennar Land Development c/o Mr. Rey Melendi Architect: Oliva Meoz Architects Mr. Hector Oliva-Princpal Oasis Commu Type of Proiect: 11,000 Sq. Ft. Community Center-Including a gym area, reception hall , 10,000 SF commercial swimming pool and 550 Sq. Ft. toddler pool Delivery Method: Negotiated Owner: Lennar Land Development c/o Mr. Rey Melendi Architect: Corwil Architects Mr. Alberto Cordoves-Princpal ft~ ( COD!itrUrtlOD group St. Thomas Tvpe of Proiect: 38,000 Sq. Ft. Exterior and Interior Build-Out of Student Dorm Rooms, Study Rooms, and Multi-Purpose Rooms Delivery Method: Conventional Lump Sum Contract Owner: ST. Thomas University-Juan Zamora 16401 NW 37th Ave Miami Gardens, FL Architect: Villa & Associates M ~!;T:~R~ -P:~~,~,?I'~~'~~E~:~ i. , 7344 SW 4B STREET SUITE 201 - MIAMI FL 33155 ~~ I I n " ( con.1:rurtion group African Tvpe of Proiect: Out of the Ground, Multi-Story, 12,000 Sq. Ft. Building. Total Costs $3,500,000.00. Completed Cultural Center with Individual Music Rooms. Delivery Method: GMP Contract CM at Risk and Value Engineering Owner: Miami-Dade County Parks and Recreation Department Architect: Judson Architecture, Inc 18425 N.W. 2nd Ave, Suite 402 Miami, Gardens, FL 33169 Proiect Description: Demolition of Existing Structure and New Construction of Recreational and Multi-Purpose Building with ADA Restrooms and Landscaping. Owner: Miami Dade County Parks and Recreation 275 NW 2nd Street Miami, FL 33128 305-755-7800 Architect: Axioma-3 Architects ~~. I l 11 < Con8tturtlon group Proiect DescriDtion: Jewish Synagogue, Multi-Purpose Building and School Classrooms. Out of Ground, Single Story, 14,000 Sq. Ft. Building on 3 Acres of Site work, Retention Areas and Landscaping. Total Costs- $4,800.000.00. Delivery Method: GMP Contract CM at Risk and Value Engineering Owner: Chabad Lubavitch Temple- Boynton Beach, Florida Architects: Saltz Michelson Architects Attn. Charles Michelson 3501 Griffin Road Ft. Lauderdale, Florida 33312 Proiect Description: 28,000 Sq. Ft. Retail Shopping Plaza Delivery Method: Negotiated Owner: Shoppes of Ives Dairy Kae's Corner LLC, Partnership 610 NW 183rd Street Suite 202-A Miami Gardens, FL 33169 Architect Representative: Gershen & Associates Paul Gershen 9769 S Dixie Highway Miami, FL 33156 h~ < con!ltruttlon group Sp <- .~ -;..~ Proiect Description: 18,000 Sq. Ft. Retail-Office 2 story bldg. Delivery Method: Negotiated Owner: Speedway Center-Outparcel 2 9769 S. Dixie Highway #201 Miami, Florida 33156 Architect Representative: Gershen Associates, PA c/o Mr. Paul Gershen 9769 South Dixie Hwy Miami, FL 33156 Proiect DescriDtion: 8,000 Sq. Ft. Retail Plaza Delivery Method: Negotiated Owner: Tropicaire Hialeah, Inc. 9769 S. Dixie Highway #201 Miami, Florida 33156 Architect ReDresentative: Gershen Associates, PA c/o Mr. Paul Gershen 9769 South Dixie Hwy Miami, FL 33156 Stapl LEED He silver certified Proiect Description: 20,000 Sq. Ft. . Retail Office Supply Store -Built to LEED standards. First LEED Certified Retail space in Miami-Dade Delivery Method: Negotiated STAPlES Owner: 2121 Biscayne Blvd. LLC Staples, Inc. 2121 Biscayne Blvd. Miami, FL 33134 Architect Representative: Sol-Arch 497 SW 74th Court Miami, FL 33155 ~~ I ll1 ( con.trurtion group Proiect Description: 28,000 Sq. Ft. Retail Shopping Center Delivery Method: Negotiated Owner: Kae's Corner LLC. Partnership 610 NW 183 rd Street Suite 202-A Miami Gardens, FL 33169 Architect Representative: Gershen Associates, PA c/o Mr. Paul Gershen 9769 South Dixie Hwy Miami, FL 33156 ~. ~ I l ~ ( COnBtrurtlon group Featu Proiect Description: 4,000 sq. ft. Starbucks and Game Stop Retail Stores Delivery Method: Negotiated Owner: HGBStar, LLC Starbucks Plaza 4770 Biscayne Blvd. Miami, FL 33137 Architect Representative: Gershen Associates, PA c/o Mr. Paul Gershen 9769 South Dixie Hwy Miami, FL 33156 rr~ ,11 < COD!lt:rUct:lOD group Proiect Description: Multi Story Commercial Office Park, 70,000 Sq. Ft. Tilt-Wall Construction Delivery Method: Negotiated Owner: Industrial Warehouse Associates c/o Berny Kopel 10850 NW 21 st Street Miami, Florida 33172 Architect Representative: M ~!:T:~R~ -P:~~,~<?I'~~':'~E~:~ !. I 7344 SW 48 STREET SUITE 201 - MIAMI FL 33155 SunTrus Proiect Description 5,000 sq. ft. Brickell Avenue Office Build Out. Delivery Method: Hard Bid Owner: SunTrust Bank, NA c/o Mike Garcia 515 East Las Olas Blvd Suite 550 Ft. Lauderdale, FL 33301 Robert Reid Wedding Architects & Planners. AlA, Inc. Architect Representative: ~<.~ ~~. "(~; ~ "0' ., - ""-:",." ,',,' lO: , Tvpe of Proiect: 150,936 sq. ft. Tilt-Wall Warehouse/Industrial Park Delivery Method: Hard Bid Owner: CPF Investment Group Mr. Ernie Cambo 2977 Mc F arlane Road # 302 Miami, FL 33133 .. .. Architect Representative: RLC Associates, Inc. It'i. I " ~iii I~~ ~~~.~: .,. . U lc.U ] _.... _Ii _= lli!iii.. 'H' CPFINY'ESllIlElHSGftOUP OiOClllt h~ < con.trurtion group ~.A. Proiect Description: 127,500 Sq. Ft. Tilt Up Warehouse/Office Building Delivery Method: Negotiated Owner: 114 Street Project HEC Warehouse 3355 NW 114th Street Miami, Florida Architect Representative: Portuondo Perotti Architects 4102 Laguna Street Miami, Florida 33146 h~ ( COnBtruct:ion group Saul Sig Proiect Description: 26,000 Sq. Ft. Tilt Wall Construction for Corporate Headquarters. Delivery Method: Negotiated Owner: Scor Enterprises Saul Signs 14085 SW 143rd Court Miami, Florida Architect: . ~~ii~~~~\~ Architecture Planning & Urban Design Space Planning Interior Design Corp 'K I II. CC\"'1/ ~i;l I l~ ( con.trurtion group VP Proiect Description: 70,000 Sq. Ft. 12 story, Tilt-wall Industrial Warehouse Office Building. Located within a Master Planned Industrial Warehouse Park, Doral, Florida. Delivery Method: Negotiated 11 I III Owner: VP Warehouse West, Inc. 201 S. Biscayne Blvd. Suite 3000 Miami Florida 33131 Architect Reoresentative: M ~!~;~R~ -~~~,~<?I'~~'~~E~:~ : ; 7344 SW 48 STREET SUITE 201 - MIAMI FL 33155 h~ ( conBtruct:ion group ~ W I PET/PLAY PARK CITY or-' A VENTURA Proiect Description: A seven (7) Acre Park Site featuring a multipurpose sports field, playground, basketball court, fitness trail and preservation of 1.5 acres of mangroves. This will provide needed recreational facilities in the northern portion of the City and ball fields that will be lit at night to expand the hours of operation. Waterways Park is currently under construction with the expansion to include Pet friendly Splash Park Delivery Method: Hard Bid Owner: City of Aventura c/o Mr. Tony Tomei 19200 West Country Club Dr. Aventura, FL 33180 Architect Representative: Craven Thompson & Associates, Inc. c/o Mr. Kevin Hart 3563 NW 53rd Street Ft. Lauderdale, Florida 33309 ~ f;l.. I III ( conBtruct:ion group Proiect Description: 50,000 Sq. Ft. Retail Shopping Plaza. Delivery Method: Negotiated Owner: Hammock Plaza Development Hammocks Plaza 7860 NW 66th Street Miami, Florida 33166 Architect Representative: Cabrera Ramos Architects 9851 NW 58th Street #107 Miami, Florida 33178 Project Name: Owner: Arch itect: Contract Amount: Construction Commence: Parks and Recreation Under Construction Design-Build of Miami Springs Gymnasium, Theater & After Disaster Shelter. Ground Up, Multi Story 35,00 sq. ft. City of Miami Springs 201 West Ward Drive Miami Springs, FL 33166 Rodriguez Pereira Architect $5,800,000.00 January 2009 Project Name: Owner: Arch itect: Contract Amount: Construction Commence: James Archer Smith Park Demolition of existing park and construction of new park-5 Acres City of Homestead 790 North Homestead Blvd. Homestead, FL 33030 Bermello Ajamil and Partners $3,000,000.00 November 2008 Project Name: Owner: Architect Rep/Civil Eng: Contract Amount: Construction Complete: Parks and Recreation Construction Complete Waterways Park A seven (7) Acre Park Site featuring a multipurpose sports field, playground, basketball court, fitness trail and commu nity center and preservation of 1.5 acres of mangroves. City of Aventura-Mr. Tony Fomei 19200 West Country Club Drive Aventura, Florida 33180 Craven Thompson & Associates $3,042,362.00 April 2008 Project Name: Owner: Architect Rep/Civil Eng: Contract Amount: Construction Complete: City of Aventura Dog Park Pet Friendly Splash Park City of Aventura 19200 West Country Club D Craven Thompson & Associates $276,318.00 May 2008 Project Name: Owner: Arch itect: Contract Amount: Construction Commence: Commercial I Retail I Warehouse Under Construction The Point At Doral-Phase II Tilt-up Multi Story-25,000 sq. ft. Commercial Office Park Industrial Warehouse Associates, Inc. 10850 NW 21st Street Suite #230 Miami, Florida 33172 Villa & Associates Architects and Planners, Inc. $1,878,834.00 December 2007 Project Name: Owner: Arch itect: Contract Amount: Construction Commence: Giralda Complex Phase I Mixed-Use Commercial, Office, Retail, Banking Giralda PS, LLC. - Mr. Alberto Lensi 2222 Ponce De Leon Blvd. Suite 500 Coral Gables, FL 33134 Fullerton Diaz and Associates $3,297,694.00 January 2008 Project Name: Owner: Arch itect: Contract Amount: Construction Commence: Ave Aviation & Commerce Center Bldg N Tilt-Wall Warehouse /Industrial Park-150,936 sq. ft. CPF Investment Group, Inc. Mr. Ernie Camba-Principle 2977 McFarlane Road #302 Miami, FL 33133 RLC Associates, Inc. $8,140,558.00 March 2008 Project Name: Owner: Arch itect: Contract Amount: Construction Commence: Our Lady of Lourdes Catholic School Educational/ Cafeteria Facility/Computer Lab Two (2) Story-25,OOO sq. ft. The Archdiocese of Miami 11400 SW 112th Street Miami, Florida Villa & Associates Architects and Planners, Inc. $2,580,613.00 January 2008 Project Name: Owner: Arch itect: Contract Amount: Construction Commence: Commercial I Retail I Warehouse Under Construction-Continued Causeway Square 160,940 Sq. Ft. 4 Story Mixed Use Building and Parking Garage/Bank Outparcel/Retail Outparcel Taubco 9551 East Bay Harbor Drive Bay Harbor, FL 331554 Saltz-Michelson Architects $21,000,000.00 November 2008 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Commercial I Retail I Warehouse Construction Complete Hialeah Gardens Plaza Starbucks-Game Stop Retail Stores, 4,000 Sq. Ft. HB Star, LLC 4770 Biscayne Blvd. Miami, Florida 33137 Gershen Associates, P.A. $786,531.00 March 2008 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Staples, Inc. 20,000 sq. ft. Retail Office Supply Store Silver LEED Certified Building 2121 Biscayne Blvd., LLC 150 Alhambra Circle Suite #800 Coral Gables, Florida 33134 Sol-Arch $2,571,194.00 March 2008 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Speedway Center Outparcel 2 Retail-Office 2 Story Bldg.-18,000 sq. ft. Tropicaire Hialeah, Inc. 9769 S. Dixie Hwy. Suite #201 Miami, Florida 33156 Gershen Associates, P.A. $1,163,291.00 July 2008 Project Name: Owner: Architect:. Contract Amount: Construction Complete: Speedway Center Outparcel 1 Retail Plaza-8,000 sq. ft. Tropicaire Hialeah, Inc. 9769 S. Dixie Hwy. Suite #201 Miami, Florida 33156 Gershen Associates, P.A. $577,294.00 July 2008 Project Name: Owner: Arch itect: Contract Amount: Construction Complete:: 72nd Avenue Flex Space 8,000 sq. ft. Office I Warehouse Flex Space Mr. Manuel Hernandez 7860 NW 66th Street Miami, Florida 33166 Cabrera Ramos Architects, Inc. $1,944,759.00 November 2008 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Commercial I Retail I Warehouse Construction Com plete-Continued VP Warehouse Building III 70,000 SF - 2 Story Tilt Up Warehouse/Office Building VP Warehouse West LLC 2700 NW 112th Ave Miami, FL 33172 Villa & Associates Architects and Planners, Inc. $3,520,000.00 June 2006 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Shoppes of Ives Dairy Shopping Center 28,000 SF - Retail Shopping Center Kaes Corners LLC. - William Green, Jr. 19801 NW 2nd Ave Miami Gardens, FL Gershen Associates Architects, Inc. $2,960,000.00 July 2006 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Saul Signs 26,000 sq. ft. - Tilt-wall Construction Corporate Headquarters Scor Enterprises 14085 SW 143rd Court Miami, FL Rodriguez Pereira Architects, Inc. $1,835,000.00 December 2006 Project Name: Owner: Architect: Contract Amount: Construction Complete: Kendall Commerce Center Warehouse 1 & 2 Two (2) 17,000 sq. ft. Warehouse-Office Buildings Canyons Roar Investments 7951 SW 40th Street, Suite 200 Miami, FL 33155 Gilbert Mojica, P.E. $1,900,000.00 September 2005 Project Name: Owner: Architect: Contract Amount: Construction Completed: All Dade Lawnmowers - Corporate Offices 6,000 sq. ft. Showroom/Office - Masonry Building Torrente Properties LLC. 1495 NW 111th Avenue Miami, FL 33172 Rodriguez Pereira Architects $645,000.00 May 2006 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Commercial I Retail I Warehouse Construction Com plete-Continued HEC Warehouse Tilt Up Warehouse/Office Building Featuring 127,500 sq. ft. 114th Project 2222 Ponce De Leon Blvd. Suite #500 Coral Gables, Florida 33134 Portuondo Perotti Architects $5,869,415.00 February 2008 Project Name: Owner: Architect: Contract Amount: Construction Complete: The Point At Doral Phase I Multi Story Commercial Office Park Tilt-Wall Construction-70,000 sq. ft. 10850 NW 21st Street Suite #230 Miami, Florida 33172 Villa & Associates Architects and Planners, Inc. $4,540.866.00 February 2008 Project Name: Owner: Architect: Contract Amount: Construction Complete: Solo Printing, Inc. CMU Warehouse, Printing Facility Featuring 30,000 sq. ft. Olos Investments 7860 NW 66th Street Miami, Florida 33166 Cabrera Ramos Architects, Inc. $2,035,073.00 February 2008 Project Name: Owner: Architect: Contract Amount: Construction Complete: Hammocks Plaza Retail Shopping Plaza Featuring 50,000 sq. ft. Hammocks Plaza Development 7860 NW 66th Street Miami, Florida 33166 Cabrera Ramos Architects, Inc. $4,569,955.00 March 2008 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Commercial I Office I Retail Tenant Improvements Construction Complete CB Richard Ellis Expansion Interior Tennant Improvements and Expansion CBRE-Brickell Office Plaza 777 Brickell Avenue 9th Floor Miami, Florida 33131 Barry Slack, PA $280,101.00 August 2007 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: SunTrust Bank-Corporate Offices Brickell Avenue-Office Build Out Sun Trust Bank Real Estate 515 East Las Olas Blvd. Suite #550 Fort Lauderdale, Florida 33301 International Design Partnership, Inc. $227,478.00 November 2007 Project Name: Owner: Architect: Construction Complete: SunTrust Bank-Brickell Avenue Branch Lobby -Office Build Out SunTrust Bank Real Estate 515 East Las Olas Blvd. Suite #550 Fort Lauderdale, Florida 33301 Robert Reid Wedding Architects September 2007 Project Name: Owner: Architect: Contract Amount: Construction Complete: Nemiroff & Auslander PA Law Office Interior Tenant Build Out SunTrust Bank Real Estate 515 East Las Olas Blvd. Suite #550 Fort Lauderdale, Florida 33301 International Design Partnership, Inc. $359,094.00 September 2007 Project Name: Owner: Arch itect: Contract Amount Scheduled Completion Commercial I Office I Retail Tenant Improvements Complete-Continued HENCORP Corporate Office Interior Build out 15,000 sq. ft. Interior Office Build out Brickell Office Plaza I CB Richard Ellis 777 Brickell Ave, 10th Floor Miami, FL 33134 Peggy Nye & Lodin Architects $915,360.00 August 2005 Project Name: Owner: Architect: Contract Amount Scheduled Start Kiwanis Little Havana Corporate Offices 4,400 sq. ft. - 2 Story Interior Build out Kiwanis Little Havana Armando Cosio Sequeira & Gavarrete Architects $528,000.00 August 2005 Project Name: Owner: Arch itect: Contract Amount Scheduled Completion Golden Glades Corporate Office Park - ADA Restroom Upgrades & Remodel 4 Story Building - Common Restroom ADA Upgrades 1405 NW 167th Street Miami Gardens, FL Golden Glades Office Park LLC I NAI Miami Mr. Ira Shapiro - 305-621-7774 Tewes Architects $250,000.00 August 2005 Project Name: Owner: Arch itect: Contract Amount Scheduled Completion Ocasa International Valuables Facility 4,500 sq. ft.-Interior Office Alteration 11330 NW 36th Street Doral, FL Ocasa International Ken Brown-305-591-0634 Angel Saqui AlA, Architects $905,000.00 May 2006 Commercial I Office I Retail Tenant Improvements Complete-Continued Project Name: The Electric Sandbox - Hair & Tanning Salon Build out 1,800 sq. ft. Interior Build out The Electric Sandbox 100 S.E. 2nd Street, 33rd Floor Miami, FL 33134 Red Design Group Architects $445,360.00 September 2005 Owner: Architect: Contract Amount: Completed: Project Name: 2103 Coral Way Spec Space Build out 4,000 sq. ft. Interior Office Build out 2103 Office Bldg / NAI Miami 9655 S Dixie Hwy, Suite 200 Miami FL 33134 Angel Saqui Architects $148,560.00 December 2005 Owner: Architect: Contract Amount: Completed: Project Name: Doral Commerce Park Bldg B - Condo Conversion 100,000 sq. ft. Interior OfficelWarehouse Condo Conversion Doral Commerce Park L TO, LLLP. Ernesto Cambo, Principal 2799 McFarlane Road, #303 Coconut Grove, FL Rodriguez Pereira Architects $970,000.00 May 2005 Owner: Arch itect: Contract Amount: Completed: Project Name: The Graham Companies Bldg 11 6,000 sq. ft. Warehouse/Office Alteration The Graham Companies, Larry Nienauber 6843 Main Street, Miami Lakes, FL Forbes Architects $136,000.00 May 2005 Owner: Arch itect: Contract Amount: Completed: Project Name: Warner Channel-HBO Latin America Interior Build out 6.500 sq. ft. Interior Office - Class A Office Build out Warner Channel - Latin America 777 Brickell Ave - Penthouse Miami, FL 33131 Leo A . Daly Architects $342,620.00 January 2005 Owner: Architect: Contract Amount: Completed: Commercial I Office I Retail Tenant Improvements Complete-Continued Project Name: Crepemaker @ The Falls Interior Build out 1,200 sq. ft. Cafe/Restuarant Crepemaker 8888 SW 136 Street Miami, FL William Placencia Architects $28,620.00 February 2005 Owner: Arch itect: Contract Amount: Completed: Project Name: Bistrolicious Cafe Interior Build out 1,200 sq. ft. Cafe/Restuarant Bistrolicious Cafe - Adriana Guerrero 3655 NW 10ih Ave, Unit 102 Miami, FL Pacetti Architects $71,620.00 February 2005 Owner: Arch itect: Contract Amount: Completed: Project Name: Dolphin Commerce Spec Space Build out 1,500 sq. ft. office building and 6,000 SF warehouse Dolphin Commerce Center - CBRE 11350 NW 25th Street, Unit 116 Miami, FL Carlos Diaz & Associates Architects $116,000.00 March 2005 Owner: Arch itect: Contract Amount: Completed: Project Name: Tiffany Continental Interior Build out 8,000 sq. ft. office building and warehouse Tiffany Continental 5900 NW 9ih Ave, Unit 5 thru 10 Miami, FL Rodriguez Pereira Architects $313,000.00 February 2005 Owner: Architect: Contract Amount Completed Project Name: Rinker Materials - Exterior /Interior Remodel Metal Building Repairs/Concrete Ramp/Overhead Door Jodansi Investments / Permont Development 9700 NW 17th St Miami, FL Villa & Associates Architects and Planners, Inc. $58,250.00 July 2005 Owner: Architect: Contract Amount: Completed: Commercial I Office I Retail Tenant Improvements Complete-Continued Project Name: City of Miami Gardens City Hall Offices 10,000 sq. ft. Interior Build out Golden Glades Associates c/o NAI Miami Realty 9655 South Dixie Highway Suite 200 Miami, FL 33156 Tewes Design Group $278,000.00 August 2004 Owner: Architect: Contract Amount: Completed: Project Name: AARON Industrial Safety Interior Build out 1,800 sq. ft. Interior Build out Omar Parets 6871 NW 3ih Court Miami, FL 33147 Williams/Delance Architects $85,500.00 December 2004 Owner: Arch itect: Contract Amount Completed: Project Name: Doral Commerce Park - Suite 400 Build out 15,200 sq. ft. Warehouse - 1 ,500-SF Office Doral Commerce Park L TD, LLLP. Ernesto Cambo, Principal 2799 McFarlane Road, Suite 303 Coconut Grove, FL Rodriguez Pereira Architects $125,000.00 December 2004 Owner: Arch itect: Contract Amount Completed Project Name: Doral Commerce Park - Suite 200Addition 900 sq. ft. Interior Office Addition - Warehouse/Office Doral Commerce Park L TD, LLLP. Ernesto Cambo, Principal 2799 McFarlane Road, Suite 303 Coconut Grove, FL Rodriguez Pereira Architects $75,000.00 October 2004 Owner: Arch itect: Contract Amount Scheduled Start Project Name: Superior Export - Senator International - Interior Expansion 1,500 sq. ft. Interior Office / Warehouse Remodel Dolphin Commerce Center Amy Ferguson, Property Manager 11200 NW 25th Street Suite 125 Miami, FL 33172 Carlos Diaz Architects $58,454.00 November 2004 Owner: Arch itect: Contract Amount Construction Complete: Project Name: Owner: Arch itect: Contract Amount Construction Complete: Commercial I Office I Retail Tenant Improvements Complete-Continued Jennifer Convertibles - Interior Remodel 5,200 sq. ft. Build out Advantis GV A 900 Park Centre Blvd. Hilda Mendoza Villa & Associates Architects and Planners, Inc. $78,000.00 June 2004 Project Name: Owner: Arch itect: Contract Amount Construction Complete: Zamora Hillman Attorneys - Interior Office Remodel ZamHill Properties 3006 Aviation Ave Miami, FL Villa & Associates Architects and Planners, Inc. $65,840.00 June 2004 Project Name: Owner: Architect: Contract Amount Construction Complete: Cherokee Enterprises - Interior Build out 4,200 sq. ft. Interior Office Build out The Graham Companies, Larry Nienauber 6843 Main Street Miami Lakes, FI. Forbes Architects $145,000.00 April 2004 Project Name: Owner: Arch itect: Contract Amount Construction Complete: South Florida Foods - Interior Build out 4,000 sq. ft. Interior Office Build out Maurice Dussaq II, President 5900 NW 9th Ave Miami, FI. Rodriguez Pereira Architects $155,000.00 March 2004 Project Name: Owner: Architect: Contract Amount Construction Complete: The Monarch - Exterior/Interior 5 Story Building Remodel Robert Cambo - Principal 2799 McFarlane Road, 3rd Floor Miami, FL Sackman2 $465,250.00 March 2004 Project Name: Owner: Arch itect: Contract Amount Construction Complete: Commercial I Office I Retail Tenant Improvements Complete-Continued Marco Destin Interior Demo & Remodel C.B.R.E - CB Richard Ellis Ilene Velez, Property Manager 11200 NW 25th Street, Suite 125 Miami, FL 33172 Villa & Associates Architects and Planners, Inc. $28,000.00 January 2004 Project Name: Owner: Arch itect: Contract Amount Construction Complete: Mid America International-Interior Remodel 2500 sq. ft. Interior Remodel Dolphin Commerce Center Amy Ferguson, Property Manager 11200 NW 25th Street, Suite 125 Miami, FL 33172 Retzsch Lanao Caycedo Architects $77,454.00 January 2004 Project Name: Owner: Contract Amount Construction Complete: (6) New Miami Dade County Bus Shelters Cemusa Miami Ltd. Juan Cueto, General Manager 2119 NW 84th Ave Miami, FL 33136 $55,692.00 January 2004 Project Name: Owner: Arch itect: Contract Amount Construction Complete: Loft Condominium Sales Center- Interior Remodel 1,600 sq. ft. Sales Center Build out The Related Group, Inc. Oscar Rodriguez, Vice President Villa & Associates Architects and Planners, Inc. $85,000.00 December 2003 Project Name: Owner: Arch itect: Contract Amount Construction Complete: UNQ Financial Group - 6,000 sq. ft. Office Remodel UNQ Financial Group, Inc. Luis Hernandez, President 2100 Ponce De Leon, Suite 1200 Coral Gables, FL Villa & Associates Architects and Planners, Inc. $75,000.00 November 2003 Project Name: Owner: Arch itect: Contract Amount Construction Complete: Commercial I Office I Retail Tenant Improvements Complete-Continued 2121 Ponce De Leon - Penthouse Restroom Remodel Advantis Realty - GV A Hilda Mendoza, Senior Property Manager 2121 Ponce De Leon, Suite 705 Coral Gables, FL Villa & Associates Architects & Planners, Inc. $44,000.00 November 2003 Project Name: Owner: Arch itect: Contract Amount Construction Complete: 2121 Ponce De Leon - Suite 930 Office Remodel Advantis Realty - GV A Hilda Mendoza, Senior Property Manager 2121 Ponce De Leon, Suite 705, Coral Gables FL Villa & Associates Architects & Planners, Inc. $28,500.00 November 2003 Project Name: Owner: Architect: Contract Amount Construction Complete: Savino Del Bene Interior Remodel Lightspeed - Swerdlow Development Co. Amy Ferguson, Property Manager 11200 NW 25th Street, Suite 125 Miami, FL 33172 Carlos Diaz & Associates $12,625.00 August 2003 Project Name: Owner: Architect: Contract Amount Construction Complete: Netrox Inc. - North Dade Office Interior Remodel 1,800 sq. ft. Netrox Inc. - Alex Rodriguez 900 Park Centre Blvd. Miami, FL Villa & Associates Architects and Planners, Inc. $35,250.00 August 2003 Project Name: Owner: Arch itect: Contract Amount Construction Complete: Interamericana Expansion Lightspeed - Swerdlow Development Co. Ilene Velez, Property Manager 11200 NW 25th Street, Suite 125 Miami, FL 33172 Carlos Diaz & Associates $48,000.00 February 2003 Project Name: Owner: Architect: Contract Amount: Construction Complete: Commercial I Office I Retail Tenant Improvements Complete-Continued Senator International Expansion Lightspeed - Swerdlow Development Co. Amy Ferguson 11200 NW 25th Street, Suite 125 Miami, FL 33172 Carlos Diaz & Associates $61,000.00 June 2003 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: 2121 Ponce De Leon - Suite 710 Remodel Advantis Realty - GV A Hilda Mendoza, Senior Property Manager 2121 Ponce De Leon, Suite 445 Coral Gables, FL Corwill Architects $23,000.00 May 2003 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Chase Financial Services - Suite 705 - Gables Cititower Advantis Realty - GV A Hilda Mendoza - Senior Property Manager 999 Ponce De Leon, Suite 101 Coral Gables, FL Corwill Architects $21,000.00 May 2003 Project Name: Owner: Architect: Contract Amount Construction Complete: Royal Palm Crowne Plaza Resort I Interior Alterations Royal Palm Crowne Plaza Resort 1545 Collins Avenue Miami Beach, FL 33139 Architectonica Architects, Sherry Gutierrez 550 Brickell Avenue Miami, FL 33131 $235,000.00 September 2002 Project Name: Owner: Architect: Contract Amount Construction Complete: H & R Block - West Dade Offices 11449 SW 40th Street Miami, FL RCC Property Advisors 900 North Federal Highway, #300 Boca Raton, FL 33432 Wayne E. Vensel Architect, Inc. $125,000.00 July 2002 Commercial I Office Interiors Tenant Improvements Complete-Continued Project Name: Savino Del Bene Corporate Offices 2,500 sq. ft. -Interior Office Construction 8815 NW 33rd Street Doral, FL Principal Global-c/o CB Richard Ellis Mrs. Karen Schienberg, Construction Project Manager 777 Brickell Avenue, Suite #900 Miami, FL Phone 305-381-6401 Angel Saqui AlA, Architects $255,000.00 Owner: Arch itect: Contract Amount: Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Master Planned Communities Amenities Construction Complete Malibu Bay Clubhouse & Entry Feature 6,200 sq. ft. Clubhousel 4,800 SF Swimming Pool Lennar Homes 1 LDI Mr. Pedro Portela, Sr. Project Manager-Land Development 730 NW 107th Avenue, 4th Floor Miami, FL Oliva Meoz Architects $1,738,798.00 July 2007 Project Name: Owner: Architect: Contract Amount: Construction Complete: Oasis Clubhouse and Entry Feature 4,000 sq. ft. Clubhouse 110,000 Sq. Ft. Swimming Pool 1 Common Areas Lennar Homes 1 LDI Waterstone IIJV Mr. Pedro Portela, Sr. Project Manager-Land Development 730 NW 107th Avenue, 4th Floor Miami, FL Corwil Architects $3,143,000.00 October 2007 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Waterstone Clubhouse & Entry Feature 4,800 sq. ft. Clubhousel 4,500 SF Swimming Pool Lennar Homes 1 LDI Waterstone IIJV Mr. Pedro Portela, Sr. Project Manager-Land Development 730 NW 107th Avenue, 4th Floor Miami, FL Oliva Meoz Architects $1,546,585.00 September 2007 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Residential I Multi-Family Construction Complete Bendevco - West Miami Twin Home New 4,000 sq. ft. - 2 Story Twin Home 1565 SW 65 Place West Miami, FL BEN Development Co. - Mr. Bernie Navarro 13155 SW 42nd Street Suite 107 Miami, FL 33175 Martin A.D. Yabor Associates $300,000.00 March 2005 Project Name: Owner: Architect: Contract Amount: Construction Complete: Mr. & Mrs. Don Peebles Residence Remodel & Alterations Existing 14,000 sq. ft. - Interior Remodel Mr. & Mrs. Donahue Peebles Coral Gables, FL 33134 Phone 305-443-4342 Ramon Pacheco & Associates $450,000.00 March 2005 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Parkview Estates - 6 Single Family Residence Development. with Off Sitework 3,000 sq. ft. - 1 Story - CMU Block - Each Residence 15250 SW 160 Place Miami, FI. Mr. Berny Kopel, President, Peninsula Developers 2700 NW 112th Ave Miami, FL 33172 Phone 305-597-7110 Villa & Associates Architects & Planners, Inc. $1,350,000.00 September 2006 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Residential I Multi-Family Construction Com plete-Continued Bendevco - Coral Gables Twin Home 5,000 sq. ft. - 2 Story Twin Home 404 Zamora Avenue Coral Gables, FL 33133 BEN Development Co. - Mr. Bernie Navarro 13155 SW 42nd Street, Suite 107 Miami, FL 33175 Martin A.D. Yabor Associates $600,000.00 June 2006 Project Name: Owner: Arch itect: Contract Amount: Construction Complete: Santander - Coral Gables Twin Home 6,000 sq. ft. - 2 Story Twin Home Santander Avenue Coral Gables, FL 33133 BEN Development Co. - Mr. Bernie Navarro 13155 SW 42nd Street, Suite 107 Miami, FL 33175 Villa & Associates Architects and Planners, Inc. $689,000.00 May 2007 Project Name: Owner: Architect: Contract Amount: Construction Complete. Educational/Institutional Construction Complete St. Thomas University - Student Dorms - Design Build 37,000 sq. ft. - 4 Story ST. Thomas University - Juan Zamora 16401 NW 37th Ave Miami Gardens, FL Villa & Associates Architects and Planners, Inc. $4,300,000.00 September 2005 City of Homestead Parks & Recreation , L____~___~. o ~ ..... r[{;~ ':1 Lm,~ - ~..... '$ f: ,';-->.;" C~'I E1'r II" j I . ~ -'" . Ll Ll l! I ; i i , ~ I I I -=~---j ~ j o I, I I I' t . ." u '._-=-~ Proiect Description: Public Park Build Out. Project consists of the demolition of an existing park, parking, fencing and other elements and the construction of a totally new park. Owner: City of Homestead 790 North Homestead Blvd Homestead, FL 33030 Architect Representative: Bermello-Ajamil & Partners 2601 South Bayshore Drive Suite 1000 Miami, FL 33133 i1~ ,11 < COn8t:ructlon group Our Lad1 Tvpe of Proiect: Our Lady of Lourdes School Media Center, Cafeteria, Offices and Classrooms. Out of the Ground, Multi-Story, 25,000 Sq. Ft. Building Delivery Method: Conventional Lump Sum Contract Owner: The Archdiocese of Miami 11400 SW 112th St. Miami, FL M ~!~:~R~ -~~~,~~I'~~'~~E~:~ I 7344 SW 48 STREET SUITE 201 - MIAMI FL 33155 Architect: Villa & Associates, Inc. City of MiamiS' And After Disaster Shelter TVDe of Proiect: Design / Build-CM @R with GMP Contract .Dual Phased Out of the Ground, Multi-Story 34,000 Sq. Ft. building, Demolition & New Parking Lot. Owner: City of Miami Springs 201 West Ward Drive Miami Springs, FL 33166-5289 Architect ReDresentative: Rodriguez Pereira and Associates, Inc. 8000 NW 7th Street, Suite 103 Miami, FL 33126 O"~l'o~\^"'1 8~" ..:0.. ..r,. ~l . ~ c .- ~.:~. ~ ) - . ~ . .......j /. ''''!/ ~ '. > .:..~? .., . .(t.:.... : . ~.......' 1 ~. '~=~,: '.,.:' 'iI r. -\ ';' , . '~ ' "-,, ~~ I I 11. ...... < con!l1:rUcdon group Proiect Description: Acre - 18.66 Consists of full site improvements to include sewer, lift station, water, earthwork, retention areas, drainage, paving, DOT deceleration lane, etc. Delivery Method: Hard Bid Owner: Mr. Mark Blieden Playa Plaza, LLC, 6100 Dutchman's Lane-Kaden Tower 6th Floor Louisville, KY 40205 Architectl Civil Enaineer: Kimberly Horn & Associates, Inc. 1201 19th Place Suite B-100 Vero Beach, FL. 32960 ~=n KimleyrHorn and Associates. Inc. Proiect Description: 160,940 sq. ft. Mixed Use Commercial, Office, Retail, Banking, Structural Steel building with con- crete fill. Parking Garage-135,797 sq. ft., Bank-5.00 sq. ft., Vitamin Shop-4,OOO sq. ft. Delivery Method: Negotiated Owner: Taubco Architect Representative: Saltz-Michelson Architects SALTZ 'IICHELSO\ ARCHITECTS Proiect Description: 30,000 sq. ft. Mixed Use Commercial, Office, Retail Banking Delivery Method: Negotiated Owner: Giralda PB, LLC. Mr. Alberto Lensi 2222 Ponce De Leon Blvd. Suite 500 Coral Gables, FL 33134 Architect Representative: Fullerton Diaz and Associates Tvpe of Proiect: New Construction of 25,000 Sq. Ft. Worship Center and Development of 3 Acre Site with Parking, Landscaping and Site Lighting. December 2008 groundbreaking. Delivery Method: Owner Negotiation Owner: Administrator-Elder Timothy C. Taylor, Sr. Architect: Frank Costoya Architect, P.A. Sunny Isles Beach Collins Avenue Streetscape Firm Name Lukes Landscaping 2200 North 30th Road Hollywood, FL 33021 Solution Construction 7955 NW 12th Street Suite 425 Doral, FL 33126 link Construction Group 7003 N. Waterway Dr. Suite 218 Miami, FL33155 Florida Sol 7055 SW 10th Street Miami, FL33144 Trade Discipline Landscaping Site Work Concrete, MOT, Pavers Electrical u-J Guillermo Fernandez President COD!iUurtiOD group B.S. from Florida International University, Construction Management State of Florida General Contractor, Lic. #CGC059565 Background: Guillermo Fernandez, a resident of Miami Florida, brings more than 16 years of construction experience to his present role of company president. Mr. Fernandez has worked on and managed projects ranging from $.5 million to $20 million including institutional facilities, renovation's, health care projects, new construction, government centers, office buildings, ten- ant improvements, and residential properties. Guillermo is responsible for the daily manage- ment of all Link Construction Group business activities and management systems. He is also one of two Project Executives on all Link Construction Group jobs. In addition, Guillermo is actively involved in many construction industry related organizations including the National As- sociation of Industrial and Office Products (NAIOP), Florida East Coast Chapter of Associated Builders and Contractors (ABC), Building Owners and Managers Association (BOMA), Latin Builders Association (LBA), etc. Experience: Mr. Fernandez co-founded Link construction Group in 2001. Prior to establishing Link Construction Group, Guillermo worked with The Tower Group, as project manager where he successfully completed over one million square feet of office and warehouse space totaling in excess of $42 million dollars. Additional project management experience centered around Gomez Construction Company, where he supervised and managed governmental, HUD and healthcare related projects. Throughout his professional career, Guillermo has performed a variety of functions from permit plans expeditor where he acquired a vast knowledge of work- ing with the local building departments, land planning and development of residential and com- mercial projects. Miguel Cerra Vice President B.S. from Florida International University, Construction Management State of Florida General Contractor, Lic. #CGC059120 Background: Miguel Cerra, a resident of Miami Florida, brings more than 16 years of construc- tion experience to his present role of company vice president. Mr. Cerra has worked on and managed projects ranging from $.5 million to $20 million including hospitals! health care pro- jects, tenant improvements, commercial! office properties, renovation's, government centers, mid-rise condominiums, high-rise condominiums, educational facilities and housing, manufac- turing ! distribution facilities, Air Port! Sea Port projects, and single family residential proper- ties. Miguel is responsible for the daily management of all Link Construction Group business activities and management systems. He is also one of two Project Executives on all Link Con- struction Group jobs. In addition, Miguel is involved in many construction industry related or- ganizations including the National Association of Industrial and Office Products (NAIOP), Flor- ida East Coast Chapter of Associated Builders and Contractors (ABC), Building Owners and Managers Association (BOMA), Latin Builders Association (LBA), etc. Experience: Mr. Cerra co-founded Link Construction Group in 2001. Prior to establishing Link Construction Group, Miguel worked for Chase Construction where he got his initial start in the construction business. There he worked as project manager where he successfully completed a vast amount of various projects where his responsibilities included but were not limited to project management procedures, project estimating, bid documentation, all project correspon- dence, and various administrative procedures as well. From there, Miguel developed addi- tional experience while with another local South Florida well respected General Contractor. Additional construction experience started in the Architectural field where Miguel work with Group M Architects as a draftsman and processor. From there he grew with Chase Construc- tion Company once again focused on project management and estimating. Throughout his pro- fessional career, Miguel has performed most all function related to construction and construc- tion management and has managed a portfolio in excess of $ 100 Million Dollars in construc- tion prior to forming Link Construction Group, Inc. Manny Fernandez Chief Estimator Background: Manny Fernandez, a resident of Miami Florida, brings more than 28 years of extensive field and supervisory construction experience as Chief Estimator. His experience includes such projects as Parks and Recreation, Public Sector, Office and Professional Condominiums, Large Scale Retail Centers, Industrial! Commercial Warehouse Parks, Healthcare and Hospital Facilities, Large Distribution Centers, Interior Office and Tenant Build Outs, Restaurants and Hospitality. Manny is responsible to prepare se- lective sections of schematic, design development and construction document estimates for one or more disciplines on various construction projects. Further responsibilities include soliciting Subcontractor bids, evaluating scopes of work, preparing quantity surveys, detailed scopes of work, reviewing project plans and specifications so that our Client expectations are met by obtaining competitive pricing for complete scope of work. for the overall bid process of our estimates from pre bid through the entire building process. His first hand knowledge of estimating, supervision and project management facilitates in the overall com- pletion of our projects; on time, on budget and with the clients full satisfaction. Project involvement from bidding stages preparing quantities, take-offs, contacting subcontractors, and handing out all the required documents. Meeting prospective project owners for a walk through and to fol- low up on work performance (to clear up questions). Prepare bid package's for commercial, residential, retail and healthcare jobs. Experience: 2006- Present Link Construction Group- Chief Estimator Responsible for overseeing all the bidding process and project estimates for all of our projects. responsible to prepare selective sections of schematic, de- sign development and construction document estimates for one or more disciplines on various construction projects. 2002-2006 JCllnternational, Inc. Miami, FL- Chief Estimator Bidding on projects ranging from one to twenty million dollars in size. Compose complete estimates on hard bids, design built, school board at risk projects and JOC projects. Coor- dinate and buyout projects awarded, compose scopes of work for contract development and pass on to the assigned P.M. Attend negotiations with owners and AlE firm's teams on design build and conceptual bids. Support PM's prior and during project duration. 1996-2002 Phillips-Adler Construction, Inc. Miami, FL-Chief Estimator Compose complete estimates on Government, Private and Institutional projects. Estimating consisted of hard bids, conceptual estimating and design built projects. Attend all negotia- tions with the project owners and AlE firms. Coordinate and buy-out projects. Support P.M. on projects during transitions and project progress. From 1980 to 1996 worked for one other General contractor performing estimating and pro- ject managing commercial, institutional, private and public projects. Some projects listed below. Manny Fernandez Chief Estimator Education: 1981-1996 University of Miami-Construction Management and Business Law Project History: (This is a consolidated list of projects) . Brickell Place condominiums 26 stories . Brickell Key condominiums 28 stories . Miami Dade county public schools . Broward county public schools . Naval Projects . U.S. Department of Justice project . U of M Beaumont Cinema . University of Miami Food Court . Pinecrest Sr. High Gymnasium . Bahama Breeze Restaurant . Miracle Center Shops & Cinemas . Various Projects at Turkey Point $ 65,000,000.00 $ 72,000,000.00 $ 1 to $ 25,000,000.00 $ 1 to $ 15,000,000.00 $ 1 to $ 30,000,000.00 $ 1,250,000.00 $ 1,015,000.00 $ 2,625,000.00 $ 7,125,000.00 $ 2,120,000.00 $ 42,000,000.00 $ 150,000.00 to $ 1.5 Million Security Clearance: Manny has previously been involved in projects for the Justice department, U.S. Navy, School Boards, City, County, GSA and Government Agencies were extensive background checks have been performed for project clearances. This designation and clearance level still remains in effect and is current. 0~ I l jl ( CDD!lt:rUcl:iDD group Miguel Quesada Director of Operations Florida International University, Construction Management State of Florida General Contractor, Lic. #CGC1504782 Background: Miguel Quesada, a resident of Miami Florida, brings more than 22 years of con- struction experience to his present role of senior project manager. His experience includes such projects as luxury residential condominiums, large scale retail centers, industrial I commercial warehouse parks, health care facilities, large distribution centers, Interior office and tenant build outs, restaurants and custom homes. Mike is responsible for the overall management of all Link Construction Group's projects. This first hand knowledge of the daily activities facilitates in the overall completion of all our projects; on time, on budget and with the clients full satisfaction. His duties range from coordinating the initial design teams to obtaining the Certificate of Occu- pancy including scheduling, material procurement, vendor and sub contractor coordination, re- views of submittals and shop drawings & permitting. After earning a degree in Building Construction, he served as a superintendent, project manager, estimator & construction manager. He has successfully completed over 11 Million square feet of product valued at over 550 Million Dollars. Experience: 2004- Present Link Construction Group- Director of Operations Responsible for overseeing all Construction Management and General Contracting projects 2000 to 2004 JEM Construction Services, Inc. - Director and Vice President Responsible for overseeing all Construction Management and General Contracting projects 1998 to 2000 CM Solutions, Inc. - Construction Manager & Consultant Projects Include Brandsmarl USA (electronic super store) Hampton Inn Suites (6 story hotel). 1996 to 1998 Tower Group, Inc. - Project Manager Projects include Panalpina Freight Forwarders, Intemational Corporate Park Industrial Fa- cility 1995 to 1996 Adler Group Construction, Inc.- Superintendent Projects include Hellmann Intemational Freight Forwarders 1990 to 1995 Walbridge/Gerrits Construction, Inc. - Superintendent & Project Manager Projects include Oakwood Plaza (retail center), Renovations & Additions to Miami Chil- dren's & Baptist Hospital. Large scale residential condominiums (Over 1500 Units) 1986 to 1990 Turner Construction Company, Inc.- Assistant Superintendent Projects include Fisher Island Condominiums. Oceanside II, III, IV- Sea Side I & II. (high Orlando Ceballos Project Manager Background: With over eighteen years of experience in the construction field, Orlando has the ability to establish and maintain a high level of professionalism, customer trust, and confidence. His job experience encumbers commercial, retail, hospital, and the school board. He manages strong customer focus by maintaining the clients needs and strives to meet their expectations and schedules. His experience encompasses projects such as retail centers, healthcare facili- ties, condominium complexes, restaurants, multi-story buildings, tenant build-outs and industrial warehouses. His daily responsibilities include: Arrange Meeting Schedule, Prepare Project Schedule, Material Sourcing, Follow-up's, Retaining Client Approval on Submittals, Consolidate Monthly I Quarterly Reports. Serves as the primary company representative responsible for managing all adminis- trative and technical requirements for construction projects. Supervises all activities related to contract administration, change orders, submittals, procurement, and schedule to ensure pro- jects are completed in a quality, profitable, and timely manner. Experience: 2007- PresentLink Construction Group- Project Manager Projects Include: . City of Miami Springs Recreation Center . Our Lady of Lourdes Media Center . Speedway Center I . Speedway Center II 2004-2007 Lennar Properties.-Senior Project Manager Projects include: . Villas at Carmel . Bali at Oasis . Tuscany Village 2003-2004 Zurqui Construction Services-Pre-construction Services / Project Manager Projects include: . African Heritage Music Hall- Multi Level Event & Music Theater - Miami . Kinloch Park Elementary- School Kitchen - Miami . Lincoln Gardens Modernization- Public Housing - Miami . Martin Luther King Jr. Memorial Park- Recreation Building - Miami Richard Perrin Project Superintendent Background / Job Assignment Richard is a dedicated, well organized employee that posses a strong leadership ability. He has a high level of competency and has earned a reputation of being trusted and well respected in the construction industry. Has worked in various different types of construction such as commercial, residential, and HRS. PROJECT EXPERIENCE: 2004- Present Link Construction Group- Project Superintendent As Project Superintendent, Richard's duties include quality control oversight for subcon- tractors weekly safety meetings and monthly safety inspections, on-site coordination of subcontractor field performance, communication and teamwork, implements the construc- tion schedule, job logs and daily reports, preparation of Requests for Information (RFls), tracking review of submittals, handles all punch-out, coordinates all inspections and filing and logging meeting minutes. Projects include: . Hencorp-777 Brickell office Build-out . Warner Channel Studios Office-777 Brickell . Maibu Bay Clubhouse . Malibu Bay guardhouse and entry feature . Waterstone clubhouse . Waterstone entry feature 1 . Waterstone entry feature 2 . Oasis clubhouse . Oasis guardhouse and entry feature 1 . Oasis guardhouse and entry feature 2 2002-2004 Falke Florida, Inc.- Superintendents Projects include: . LNR Corporate Headquarters-Miami Beach . Microsoft Latin American Headquarters . Airport Corporate Center . Applied Digital Solutions . Lash and Goldberg-Bank of America Tower . South Pointe Tower Perrin Brothers Construction-Project Foreman/Lead Carpenter Projects include: . Commercial and Residential Remodeling . Tenant Improvement in Coral Gables, University of Miami, and Locations in Downtown Miami. . Nursing Homes with HRS type inspections. ~~ t~\\t\)t"\\~\. LINK CONSTRUCTION GROUP, INC. FINANCIAL STATEMENTS WITI-I ACCOMP ANYINO IN FORMA TION SIX MONTHS ENDED JUNE 30, 2008 AND ACCOUNTANT'S REVIEW REpORT CERTIFIED PUBLIC ACCOUNTANT ~ , ~~~ JVL'l.J1l2{ J. !1(O'1J~R.JJjl1'EZ, p..9l. JULIAN J. RODRIGUEZ, CPA OMAIRA VILLAVICENCIO, CPA AUNA F. CASlllO, CPA TENILLE F. FABIAN, CPA PATRICIA M. MEIRELI!S, CPA MEMBER AMElUCAN INSTlTIJTE OF CEImFlED PUBLIC ACCOUNTANTS FLORIDA INsnruTE OF CEImFI1!D PUBLIC ACCOUNTANTS ACCOUNTANT'S REVIEW REpORT The Stockholders and Board of Directors Link. Construction Group, Inc. I have reviewed the balance sheet of Link Construction Group, Inc. as of June 30, 2008 and the related statements of income and retained earnings, and cash flows for the six months then ended, in accordance with Statements on Standards for Accounting and Review Services issued by the American Institute of Certified Public Accountants. All information included in these financial statements is the representation of the management of Link Construction Group, Inc. A review consists principally of inquiries of Company personnel and analytical procedures applied to financial data. It is substantially less in scope than an audit in accordance with generally accepted auditing standards, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, I do not express such an opinion. Based on my review, I am not aware of any material modifications that should be made to the accompanying financial statements in order for them to be in conformity with generally accepted accounting principles. (:4. August 7, 2008 ~~ ~~~ -1- 95 MERRJCK WAY' SUITE 250 . CORAL GABLES, FL 33134 . TELEPHONE: (305) 445-0777 . FACSIMILE: (305) 446-8576 BALANCE SHEET ,# LINK CONSTRUCTION GROUP, INC. '-., JUNE 30,2008 ASSETS Current assets: Cash and cash equivalents Contracts receivable, including retain ages 01'$819,861 less $85,000 allowance for doubtful accOtmts Costs and estimated earnings in excess of billings on uncompleted contracts Other receivables Prepaid expenses $ 2,267:494 5,641,999 2,046 4,077 24.141 Total current assets 7.939.757 Property and equipment Less: Accumulated depreciation 324,902 145.813 179.089 Investment injoint venture 150.546 $ 8.269.392 ~+ , -2- LINK CONSTRUCTION GROUP, INC. STATEMENT OF INCOME AND RETAINED EARNINGS SIX MONTHS ENDED JUNE 30,2008 Construction revenues Construction costs Gross profit General and administrative expenses Operating income Other income ( expense): Interest income Interest expense Net income Retained earnings, January 1, 2008 Distributions to stockholders Retained earnings, June 30, 2008 # ~~ See accompanying notes to the financial statements and accountant's review report. -4- ~ $ 16,057,861 14.145.480 1,912,381 1.007.993 904.388 40,731 .., 6')')) (.:l. __ 37. 109 94 I ,497 3,077,124 (620,377) $ 3.398.244 LINK CONSTRUCTION GROUP, INC. STATEMENT OF CASH FLOWS SIX MONTHS ENDED JUNE 30, 2008 Cash flows from operating activities: Net income Adjustments to reconcile net income to net cash from operating activities: Depreciation and amortization Bad debt provision Change in assets and liabilities: Contracts receivable Costs and estimated emnings in excess of billings on uncompleted contracts Other receivables Prepaid expenses Accounts payable and accrued liabilities Billings in excess of costs and estimated earnings on uncompleted contracts Net cash used for operating activities Cash flows from investing activities: Purchase of property and equipment Advances to joint venture Net cash used for investing activities Cash flows from fmancing activities: Proceeds from short-term debt Payments on short-term debt Payments on long-term debt Distributions to stockholders Net cash used for financing activities Net decrease in cash and cash equivalents Cash and cash equivalents, January 1,2008 Cash and cash equivalents, June 30, 2008 ~ See accompanying notes to the financial statements and accountant's review report. -5- , ~W $ 941,497 20,964 75,000 1,226,159 48,102 (4,077) 115,878 (1,347,071) (1.398.605) (322.153 ) (27.231) (11.000) (38,231) 50,000 (50.000) (15,053 ) (620.377) (635.430) (995,814) 3,263.308 $ 2.267.494 NIELSON, ALTER & ASSOCIATES NCI NIElSON & CoMPANY, INC. THERE IS A DIFFERENCE... December 5, 2008 The City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RE: Link Construction Groqp, Inc. SRAtA/Collins Avenue Streetscape (from 18?h Street to William Lehman Causeway); ITB No. 08-10-01 j i f--- ! , Gentlemen: Please be advised that we are the bonding agents for Link Construction Group, Ine. We have had the privilege of providing Bid, Performance and Payment Bonds for them since 2001. Link Construction Group, Ine. is bonded through Hartford Fire Insurance Company and has a substantial bond line of credit of $30,000,000 for single projects and an aggregate bond line of $60)000,000. Link Construction Group has successfully completed all of their projects that we have bonded in a very satisfactory and professional manner and have never received any issues from the owners, subcontractors or suppliers and L'1ey have an excellent reputation in the construction industry. We are very confident of their integrity and abilities and once again, would extend our utmost recommendation on their behalf. We consider them to be among our finest clients and hold them in the highest regard. Naturally, any bonds that are issued will be based upon acceptable contract terms as well as normal and standard underwriting criteria at the time of request H we can provide any other assurance or assistance, please feel free to give us a call. Thank you. Very truly yours, Ckw-e~ Charles D. Nielson, Attorney~in-Fact PROVIDING BONDS FOR THE CONSTRUCTION INDUSTRY , ; r"-. j ! I f i ! ; I I f ! t ! f J ! f i , ; CDN:glm BOOO GOVJ;;RNORS SQUARE BI.VD. · SUITJ;; 101 . MIAMI LAKES, FL 33016' DADJ;;: 1800-557-2663 (BOND) PHONE: (305) 722-2663 (BOND) . FAX: (305) 558-9650 WWW.NIELSONBONDS.COM CPF Investments-AVE Aviation Commerce Sarria Properties & Investment Mr. Ernie Cambo Tel: 305-303-9894 Lennar Homes, Land Development Mr. Rey Melendi-Land Div. President Tel. 305-559-1951 HGB Star / LLC Centerline Realty Mr. Tony Cervone-Principal Tel: 305-976-9008 Mr. Tony Tomei City of Aventura-Capitallmprovements Dir. Tel: 305-218-9230 Mr. Bill Ogden Tropicaire Development Tel: 305-663-5860 Hammocks Plaza LLC. Mr. Manny Hernandez-Principal Tel. 305-594-8699 Magic City Development Mr. Mario Semeraro-Dir. Of Construction Tel: 305-445-6011 Kiwanis Little Havana Mr. Armando Cosio Tel: 305-644-8888 CLIENT REFERENCES Owners I Developers I Property Managers Urban Group Development-Ibiza Village Mr. Bernie Navarro Tel: 305-502-8511 CB Richard Ellis-777 Brickell Ms.llene Velez-Property Manager Tel: 305-358-3811 Lennar Homes-Land Division Mr. Pedro Portela-Sr. Project Manager Tel: 305-559-1951 St. Thomas University Mr. Juan Zamora-Plant Operation Dir. Tel: 305-628-6594 MK Realty Mr. Bill Biondi-Principal Tel. 305-582-4288 Sarria Properties and Investments Mr. Frank Sarria-Principal Tel: 305-441-1912 Taylor Mathis Hilda Mendoza - Senior Property Manager Tel: 305-447-9299 CB Richard Ellis Brian Jaffe-North Region Director Tel: 206-292-6086 CLIENT REFERENCES General Building Architects Healthcare Architects Villa and Associates Architects & Planners, Inc. Mr. Carlos Huembes Tel: 305-661-8181 Gresham Smith & Partners Ed Hengtgen-Project Architect Tel: 954-981-9100 HKS Architects Mr. Virgil Campameria-Principal Tel: 305-416-6100 Saltz Michelson Messer's Mark Saltz & Charlie Michelson, Principal Tel: 954-266-2700 Angel Saqui Architects Mr. Angel Saqui-Principal Tel: 305-445-4544 Robert Reid Wedding Architects, Inc. Mr. Jose' Gordillo Tel: 954-492-9980 Rodriguez Pereira Architects Messer's AI Pereira I Joe Rodriguez-Principal Tel: 305-592-8045 In-Design, Inc. Karen and Laura Tel: 561-620-8185 Cabrera Ramos Architects Mrs. Rosa Ramos-Principal Tel: 305-593-0750 Sol Architects-Staples Project Mr. Hamed Rodriguez-Principal Tel. 305-740-0723 Naya Architects Mr. Luis Naya Tel: 305-265-7177 MGE Architect's Mr. Jose' Estevez Tel: 305-444-0413 Arquitectonica Architecture Sherri Gutierrez - Project Architect Tel: 305-372-1812 RLC Architects, Inc. Mr. Bruce Retzsch-Principal Tel: 561-393-6555 Walton Architect Associates Mr. Doug Walton, Principal Tel: 407-423-0627 Christopher Andrew Sable Architects Mr. Christopher Sable-Principal Ph. 954-474-8745 Craven Thompson and Associates, Inc. Mr. Kevin Hart, Director of Engineering Tel: 954-739-6400 Corwil Architects Mr. Corwil, Principal Tel: 305-448-7383 Gershen Associates, PA Mr. Paul Gershen, Principal Tel: 305-661-7122 CD Architects Mr. Carlos Diaz-Principal 305-599-2888 Sequeira & Gavarrete P.A. Mr. Roberto Sequeira-Principal Tel: 305-441-1556 Olivia Meoz Architects Mr. Hector Olivia-Principal Tel: 786-663-7239 Palm Springs Hospital Mr. Tony Mazzorana Tel: 305-558-2500 Memorial Hospital Miramar *Mr. Aurelio Fernandez III, C.E.O. Tel: 954-538-4800 Mount Sinai Medical Center Mr. Joe Hagler- Construction Services, PM Tel: 305- 674-2121 ext 52276 Leon Medical Centers Mr. Albert Mauri, C.F.O. Tel: 305-642-1662 North Shore Medical Center-Tenet Health Jaime Alfayete-Plant Operations Mgr Tel: 305-694-3603 Memorial Healthcare System Gary Mckee-PM, Construction & Design Tel: 954-433-7184 Memorial Healthcare System Joseph G. Alcure, Jr.-Director, Construction & Design Tel: 954-433~7184 CLIENT REFERENCES Hialeah Hospital- Tenet Health Systems Mark Atteberry-Project Manager Tel: 305-859-1404 Coral Gables Hospital- Tenet Health Cristina Jimenez-Assistant Administrator Tel: 305-441-6895 Florida Medical Center-Tenet Health Tel: 954-735-6000 Palmetto General Hospital-Tenet Health Ms Ana Mederos Tel: 305-642-1662 Memorial Hospital Pembroke Mr. Gary McKee, PM Tel: 954-433-7184 Leon Medical Centers Joe Aldure Tel: 305-642-1662 *Mr. Aurelio was CEO for Florida Medical Center for reference purposes City of A ventura Government Center 19200 West Country Club Drive Aventura, Florida 33180 Office of the City Manager April 18,2008 Link Construction Group CIO Mr. Guillermo Fernandez 7003 N. Waterway Drive, Suite #218 Miami, FL 33155 Re: Letter of Reference We, the City of Aventura would like to express its great appreciation for the work and efforts of Link Construction Group, Inc. has provided throughout the construction of Waterways Park Expansion and the addition of the Waterways Dog Park. Mr. Fernandez and project manager Nick Fuoco have demonstrated uncommon professionalism and competency that successfully conveyed the design and engineer's design and plans from paper to the actual construction of the two parks simultaneously. All the while, providing a very satisfying park and recreation center. It is with highly unusual, especially given the few challenges up front, that volumes of govemment regulations and information were successfully incorporated into a comprehensive, accurate and consistent construction and construction management that in turn ensured function and aesthetic excellence throughout the City of Aventura Parks and Recreation systems. Mr. Fernandez and his associates Mr. Nick Fuoco and Mr. Bill Racavich, through dedication, have eamed the respect of this City. My staff and I thought it important that you know how much we appreciate their efforts. Very truly yours, ~.::f Jo~ Antonio F. Tomei Capital Projects Manager PHONE: 305-466-8910 · FAX: 305-466-8919 www.cityofaventura.com I ~~~p~~~ Tenet South Florida 651 East 25th Street Hialeah, Fl 33013 Tel 305693,6100 www.hialeahhosp.com To Whom It May Concern: Link Consh'uction Group has been working in our facility since 2002 on a variety of project types and sizes. Currently Link is putting together a design/build project budgeted at $2,000,000.00, Some of these past projects were h',lltitional bid projects as well as design/build and samplings include: · Three (3) CT Scans · Joint Commission Life Safety Upgrades and Renovations Throughout Most Floors of the Hospital · Emergency Room Renovation · New Post Partum Center · New Wing For Surgical Suites The management and guidance, proficiency, internal correspondence, and knowledge displayed by their staff during each phase of the variety of projects made the construction process more efficient and easier than expected. The dust conh'ol procedures, the attention to patient safety, and the cleanliness of their job sites were without compromise. In addition, AHCA guidelines and procedures were followed without exception. Should you have any questions regarding their performance or their capacity to follow AHCA and ICRA requirements, guidelines and procedures, please contact me at your earliest convenience at 305-835-4385. We look forward to continuing our working relationship and I highly recommend Link to other Medical and HeaIthcare providers. ~ TeneT ---' MAGIC C~rTY LJEVELOPMENT CO. Link Construction Group, Inc. Willy Fernandez, President 7003 North Waterway Drive Suite #218 Miami, Florida 33155 Concerning: Letter of Recommendation - La Carreta Cafe At Mercy Hospital, Miami, Florida Dear Sirs, It is my pleasure to write this recommendation letter to show my appreciation to Link Construction Group's team for the excellent work and the quick timeline they displayed on my construction project. From the moment, I approached Link Construction Group their team of professionals displayed all the proper qualities necessary to manage our project, taking into account the sensitivity I complexity of the project, the timeline requirements, and expediting the design and permits process. I was truly impressed that the team made sure to incorporate my vision into each of the phases of the project, including my personal initiated changes. I always got answers to questions within hours and updates on a regular basis during each part of the permitting and construction process. Unfortunately, Link was presented some unexpected surprises and unforeseen conditions, Mike Quesada, my project executive, addressed all issues and presented all resolutions in a timely manor so that the project schedule would be maintained as presented. Although the cafe within the hospital was a relatively small project in square footage, the issues at hand were as complex as any large-scale project if not more complicated; I always felt that my project was top priority at Link Construction Group. I was very happy with the quality of the finished product, and every aspect of the project from start to finish. I have already recommended Link Construction Group, and will continue to do so for other upcoming building opportunities with our company. / / Regards, _ .~...~. ~ ----_. ; 7d:'~~ ,."-____ ~ Mario Semeraro Magic City Development Senior Project Manager I Qualifier 3663 S\V 8TII 51 RTf I 3RD flOOR (305) 445-6011 F/\X (305) 445-9469 MLi\MI FLORIDi\ 33135 \tV \'VW.MACIC -CITY-MIA.COM - February 23. 2007 To Whom It May Concern: May this letter serve as a reference on Link Construction Group having worked together on several projects at Coral Gables Hospital in Coral Gables, Florida. Link was the contractor that worked with MGE Architects on several projects including the Chase Upgrade, Vertical Shaft, Life Safety and the ER Triage Center. These projects were successfully completed and reviewed by AHCA obtaining approval for occupancy. Link Construction Group performed their work professionally and cautiously. understanding that these sensitive projects took place in operational nursing wings. They were always team members and performed in the best interest of the Hospital. I enthusiastically recommend them to assist you and your organization in future construction projects. Sincerely, Jose L. Estevez, AlA Principal . t MGE o [NJ IAV lAo a r c h tee t s Link Construction Group, Inc. Miguel Cerra, Vice President 7003 North Waterway Drive Suite #218 Miami, Florida 33155 Re: Letter of Recommendation Dear Miguel, We would like to take this opportunity to personally thank you and the entire organization at Link Construction Group, for the work your company did on the various projects we designed for North Shore Medical Center. Given the tight deadlines your firm had to work with, and the quality expected by the facility your team performed admirably. The Project Manager and Superintendent were exceptional in their professionalism, and ability to keep this project on schedule and under budget. It has become evermore difficult for Contractors to deal with the rigorous and complicated demands of working within a Healthcare Facility. In fact I would say very few contractors would have been able to complete our projects as successfully. It has truly been a pleasure to work with an organization that is knowledgeable and takes personnel pride and caring for each and every project they work on. We most certainly would recommend your company to anyone else. The professionalism, leadership, communication and expertise they displayed during each phase of our projects at North Shore Hospital. NICU Neonatal Intensive Care Unit Expansion . Cancer Center Renovation . New Linear Accelerator Replacement . CT Scan Replacement were produced more efficiently and easier than we ever expected. Furthermore, your compliance with the ICRA Requirements, the attention to patient safety was notable. All AHCA guidelines and procedures were followed without exception. We look forward to working together again soon and highly recommend you to others seeking a long term relationship with a first class general contracting firm. ~~~. Vir~paneria AlA NA Y A Architects 7400 N. W. 7th Street, Suite 101 Miami, Florida, 33126 naya@nayaarchitects com FL AA0002689 Tel: 305-265-7177 Fax: 305-262-8435 Oliva - Meoz Architects & Planners, Inc. 343 Alcazar Avenue, Coral Gables FL. 33134 Telephone: (786) 552-7293 Facsimile: (786) 552-728] April 23, 2008 RE: Link Construction Group To Whom It May Concern: This letter is prepared with the intention of recommending to you Link Construction Group as General Contractors. I have known this company for quite a few years now, in which I have had the privilege of working with them on Malibu Bay Clubhouse and Waterstone II Clubhouse, two large and distinctive community recreational buildings for one of my mayor clients, Lennar Homes, Dade Division. During this time I have created an excellent working relationship with Nicholas Fuoco, the Project Manager from Link Construction Group assigned to these projects. Mr. Fuoco has a great personality, cooperative nature, is well mannered, respectful and very enthusiastic about the projects he is involved with. He coordinates the trades as well as the professional disciplines and is always way ahead of the physical construction, making certain that things will be done according to plans and sorting out things that need clarifications or decisions, in order not to create unnecessary delays in the project. Based on my past experiences with Link Construction Group and with Mr. Fuoco, spearheading the construction of my designs, I recommend them without hesitation. Should you have any questions or need any additional information, please, do not hesitate to contact me at your earliest convenience. Sincerely, . . ector L. Oliva, AI.A Oliva-Meoz Architects & Planners, Inc. ~~ j~ ST. THOMAS ,. .. j , ., ,., . " . , ! ., '- ' 1 ' , , " ~ . , , , . . .. Det't' lop; lIg LecHlos For Lije" Office of Physical Plant April 13, 2007 Miguel Cerra Link Construction Group, Inc. 7003 N Waterway Drive Suite 218 Miami, FL 33155 Dear Mr. Cerra, "This letter is to commend Link Construction Group on the outstanding performance and cooperation provided during the construction of our signature Student Housing Facility (Villanova Hall), the first new student housing project in 46 years. In spite of adverse weather conditions during 2006 hurricane season, Links' construction team demonstrated abilities in all aspects of construction in an effort to complete the project in a timely manner. We will recommend Link Construction Group for future sensitive, major, and complex construction projects on our campus and elsewhere." "I will never forget the initial meeting you convened with all parties where you clearly outlined the lines of communications necessary for the project to smoothly proceed. Unbelievable is the only word I can use to describe how you were able to successfully balance the daily issues confronting building in an occupied and busy campus, and maintaining your work area in a safe and clean environment. I have managed and directed many construction projects in my career and I have never had a project team who was easier to work with or more understanding of our needs. By far, this has been the smoothest construction project I have ever managed" . "Not only did you meet the expectations expressed through our contract and construction documents, but you have gone beyond them by maintaining a relationship with this organization and by performing work on our project at a moments' notice that was beyond the period of guarantee. It is clear that Link Construction Group is guided by high principles of business ethics and a commitment to long-term relationships with their clients." I welcome the opportunity to recommend your company to prospective persons or organizations should they want to discuss this topic first hand. W arm Regards, J n M. lama a D ector of Ph. 16401 NW 37'" Avenue, Miami Gardens. FL 33054 - Phone: (305) 628-6594 - Fax: (305) 628-6794 \III~ SUNTRUST- Mike Garcia Vice President Sun Trust Bank 515 East Las Olas Boulevard Suite 550 Fort Lauderdale, Florida 33301 Tel 954.765.7191 Fax 954.7657349 Link Construction Group, Inc. Guillermo Fernandez, President 7003 North Waterway Drive Suite #218 Miami, Florida 33155 Re: Letter of Recommelldatioll Oasis Brallch, Home stead Florida Dear Sirs, I am writing to express how pleased we are with the performance of Link Construction Group, Inc. in delivering our Oasis project in Homestead, Florida. Overall communication and integration with the architect and our construction representatives throughout the project ran smoothly. From management to the field, everyone at Link Construction Group, Inc. was easy to work with and all requests were handled satisfactorily. The work of your subcontractors met and or exceeded our expectations and delivered a space that I was proud to hand over to our operations. Based on this experience, I would not hesitate to use Link again in the future. Regards,., . //~//'. (' .4 .. ".'-:.. : 1'::1~ ~c( / c:ri~t:tf'cl/ Mikk Garcia SunTrust Bank Corporate Real Estate SECTION 10 NON-COLLUSION AFFIDAVIT ~ATEOFRO~DA ) ) COUNTY OF Dade ) The undersigned being first duly sworn as provided by law, deposes, and says: 10.1. This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. 10.2. The undersigned is authorized to make this Affidavit on behalf of, Link Construction Group (Name of Corporation, Partnership, Individual, etc.) a, Corpora t j on (Type of Business) . formed under the laws of F lor i da (State) of which he is PrP-Rirlp.nt (Sole Owner, Partner, President, etc.) 10.3. Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Rorida is directly interested therein. 10.4. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or indirectly with any bidder or person, firm or corporation, to put in a sham Bid, or that such person, firm or corporation, shall refrain from bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said proposal or proposals of any other bidder; and all statements contained in the proposal or proposals described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 10. irectly or indirectly submitted said proposal or the contents thereof, or divulged informati ative thereto, to any association or to any member or agent thereof. President AFFIANT'S TITlE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this ~ day of t:ersonaJly Known ~produCed Identification Type of identification December . 200~ ~ ~P= u.g~r NOTARY PUBUC (name printed or typed) (Affix seal here) N~J~Y PUBLIC-STATE OF FLORIDA !),.ri.\ Orla~d~ Ceballos, Jr. ;.. j COrr:nuSSJOD # DD708411 "."""..., ExpIres: OCT. 07, 2011 BONDED THRU ATLANTIc BONDING cO.,INe. END OF SECTION PAGE 5S OF 130 BID No. OS-10-01 SECTION 11 PUBUC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Aorida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". CONFuas OF INTEREST The award of any contract hereunder is subject to the provisions of Chapter 112, Aorida State Statutes. Bidder's must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its' agencies. DOCUMENT CONTINUES ON NEXT PAGE PAGE 59 Of 130 BID No. 08-10-01 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to Otv of Sunny Isles Beach by Guillermo Fernandez, President [print individual's name and title] Link Construction Group [print name 01 entity srnmitting sworn statement] for whose business address is: 7003 N. Waterway Drive Suite 218 Miami, FL 33155 and (if applicable) its Federal Employer Identification number (FEIN) is 651103903 (If the entity had no FEIN, include the Sodal Security Number of the individual signing this sworn statement: .) 11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any publiC entity or an agency or political subdivision of any other · state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere. 11.4. I understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the. entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 11.5. I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to PAGE 60 Of 130 BIO No. 08-10-01 transact business with a public entity. The term "persons" indudes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement (Indicate which statement applies.) -L Neither the entity submitting this swom statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this swom statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) J UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBUC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBUC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. J ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBUC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SEmON 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAlNED IN THIS FORM. ~ By: (Sign re) Guillermo FernAnnp7. (Printed Name) President (Title) Sworn to and subscribed before me this ~ day of December , 20~ by (AFFIX NOTARY ~~TATE ""'LORIn' . m .:-'ij\ r ~d~ Ceballos, Jr. Signature: Notary Public - State of Florida ~ j Co~mlsslOn # DD708411 (()t7~ C~~ f ...., ....- ExpIres: OCT. 07, 2011 . T .. d ' BOND'E7:IC BONDING co., INC. Pnnt or ype Commlsslone Name ~rsonallY Kno~n OR Produced Identification Type of Identification Produced END OF SECTION PAGE 61 OF 130 BID No. 08-10-01 SECTION 17 ACKNOWLEDGMENT OF CONFORMANCE WITH OSHA STANDARDS To: City of Sunny Isles Beach We, Link Construction Group (Prime Contractor] . hereby acknowledge and agree that we, as the Prime Contractor for the SR A1NCollins Avenue Streetscape Improvements, 08-10- 01, as specified, have the sole responsibility for compliance with all the requirements of the Federal Occupational Safety and Health Act of 1970, and all State and local safety and health regulations, and agree to indemnify and hold harmless the City of Sunny Isles Beach against any and all liability, claims, damages losses and expenses they may incur due to the failure of Please see tab Item 9.15-List of Subcontractors [Sub-Contractor) [Sub-Contractor) [Sub-Contractor) to comply with such act or regulation. Guillermo Fernandez CONTRACTOR President ~ BY- END OF SECTION PAGE 78 OF 130 BID No. 08-10-01 SECTION 18 EQUAL OPPORTUNITY I AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, a litical affiliation or belief. Signer!: GUl Title: President Firm: Link Construction Group Address: 7003 N. Waterway Dr. Suite 218 Miami, FL 33155 END OF SEGJON PAGE 79 OF 130 BID No. 08-10-01 SECTION 19 CONFLICT OF INTEREST STATEMENT STATE OF FLORIDA COUNlY OF Dade BEFORE ME, the undersigned authority, personally appeared was duly sworn, deposes, and states: 19.1. I am the President a local office in Miami and principal office in Guillermo Fernandez. who of Link Constructiono Groupwith Same 19.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No. 08-10-01 described as: SR AINCollins Avenue Streetscape Improvements. 19.3. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 19.4. The Affiant states that only one submittal for the above bid is being submitted and that the above named entity has no financial interest in other entities submitting bids for the same project. 19.5. Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 19.6. Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 19.7. Neither the entity, nor its affiliates, nor anyone associated with them has any potential conflict of interest due to any other clients, contracts, or property interests for this project. 19.8. I certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 19.9. I certify that no member of the entityls ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 19.10. In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach. ~m AFFIANT December 120~. Guillermo Fernandez-President Print or Type Name and Title Swor!)..J:9-and subscribed before me thy ~ day of December , 20~. ~ Personally Known V OR "'~ o Produced Identification ; Type of Id~ NOTARYPUBLIC-STATEOFFLORIDA NOTARY PUBUC STATE OF FLORIDA ol'i'''' Orlando Ceballos, Jr. ~ ' iCommission #DD708411 ....".,,""..: Expires: OCT. 07, 2011 BONDED THRU ATLANTIC BONDING CO" INe. PAGE 80 Of 130 BID No. 08-10-01 SECTION 20 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No". If you answer "Yes", please explain in the space provided, or on a separate sheet attached to this form. 20.1. Has you firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO X 20.2. Has your firm, or any member of your firm, been declared in defaultl terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO X 20.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES NO X If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this bid for the Oty of Sunny Isles Beach, Bid No. 07-10-04, Landscape Maintenance Services. Link Construction Group December 8, 2008 ~irm Date Guillermo Fernandez-President A ~ ze _ - nature Print or Type Name and Title END OF SECTION PAGE 81 OF 130 BID No. 08-10-01 SECTION 21 ANTI-KICKBACK AFFIDAVIT STATE OF flORIDA COUNlY OF Dade ) ) ) I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by fflcer of the corporation. o Title: President By: The foregoing instrument was acknowledged before me this ~ day of December 20~ by Guillermo Fernandez [name of person], as President [type of authority], for Link Construction Group [name of party on behalf of whom instrument was executed]. NOTARY PUBLIC-STATE OF FLORIDA !i'" Orlando Ceballos, Jr. \ jCo~mission #DD708411 .",......." ExpIres: OCT. 07, 2011 BONDED THRU ATLANTIC BONDING CO., INe. (1J Notary Public --.:-state of Florida AFFIX NOTARY STAMP HERE: DM\JPo ~U-Df Print or Type Commissioned Name Personally Known / OR Produced Identification Type of Identification Produced END OF SECTION PAGE 82 Of 130 BID No. 08-10-01 SECTION 22 BID CHECKUST THE FOLLOWING ARE REQUIREMENTS OF THIS BID. USE OF THIS CHECKLIST WILL HELP ENSURE THAT YOUR SUBMISSION IS COMPLETE. Place a check mark in the "Done" column as you complete and enclose each item. ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ Bid Response Sheet/Bid Form/Bid Specifications Bid Security - Five Percent (5%) Certificate(s) of Insurance Certificates of Competencies Local Business Tax (Occupational Business License) State License( s) List of Proposed Sub-Contractors Bidder Qualification Statement Non-Collusion Affidavit Non-Kickback Affidavit Public Entity Crimes Sworn Statement Acknowledgement of Conformance with OSHA Standards Equal Opportunity/Affirmative Action Statement Conflict of Interest Statement Dispute Disclosure Form Bid Checklist This checklist must be part of the Bid. Please read the entire Bid documents thoroughly to ensure that your submission is complete. PAGE 83 Of 130 BID No. 08-10-01 END OF SECTION SECTION 12 NOTICE OF AWARD TO: PROJECT DESCRIPTION: SR AINCollins Avenue Streetscape Improvements, Bid No. The City has considered the Bid submitted by you for the above described Work in response to its Advertisement for Bid and Instruction to Bidders. You are hereby notified that your Bid has been accepted for the SR AlA/Collins Avenue Streetscape Improvements Contract Bid # in the estimated amount of $ You are required by the Instruction to Bidders to execute the Agreement and furnish the required Contractor's Performance Bond, Payment Bond and Certificates of Insurance within ten days from the date of this Notice to you. If you fail to execute said Agreement and to furnish said Bonds and Insurance within ten days from the date of this Notice, the Oty will be entitled to disqualify the Bid, revoke the award and retain the Bid Security. Dated this _ day of ,20_. BY: A. John Szerlag, City Manager ACCEPTANCE OF NOnCE OF AWARD Receipt of the above Notice of Award is hereby acknowledged by this day of ,20_. BY: mLE: You are required to return an acknowledged copy of this Notice of Award to the City. END OF SEmON PAGE 62 OF 130 BID No. 08-10-01 ..' SECTION 13 DRAFT AGREEMENT CITY OF SUNNY ISLES BEACH SR AlA/Collins Avenue Streetscape Improvements (from 187th Street to Wm Lehman Causeway) WITH o. 'U... CONTRACT NO: 08-10-01 THIS AGREEMENT ("Agreement") made and entered into this day of 200----J by and between the CITY OF SUNNY ISLES BEACH, FLORIDA, a municipal corporation of the State of Florida (hereinafter referred as to "City"), and . a Florida corporation, authorized to do business in the State of Florida (hereinafter referred to as "Contractor"). RECITALS WHEREAS, Contractor has expressed the ability and desire to provide Services, subject to the terms and conditions contained herein, and has submitted a proposal to the City for the Collins Avenue Streetscape Improvements, which is attached hereto and made a part hereof; and .-, ;> WHEREAS, the City's Code provides that any purchase in excess of $25,000.00 requires Oty Commission approval and compliance with the City's procurement code, which mandates that such purchases must be awarded by competitive bidding, with certain limited exceptions; and WHEREAS, in response to the City's Invitation to Bid No. 08-10-01 and Resolution No. NOW THEREFORE, in consideration of the foregoing and for the mutual covenants, representations and warranties and other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, the parties agree as follows: 13.1. RECITALS. The Recitals set forth above are hereby incorporated into this Agreement and made a part hereof for reference. 13.2. WORK. Contractor shall complete all work as specified or indicated in the Contract Documents as defined in Section 13.4 herein and Section 5.1 of the General Conditions to the Bid Documents. The Work is generally described as streetscape and landscape enhancements on SR AINCollins Avenue from 187th Street to Wm Lehman Causeway and the intersection of SR A1NCollins Avenue and Sunny Isles Boulevard. 13.3. CONSULTANT. The project has been designed by: O'leary Richards Design Associates, Inc. Landscape Architects 8525 SW 9200 Street, Suite C-11 Miami, Florida 33156 (305) 596-6628 C.A. No. LC26000195 , PAGE 63 OF 130 BID No. 08-10-01 and Alvarez Engineers, Inc. Civil/Electrical Engineers 10560 NW 25111 Street, Suite 102 Miami, FL 33172 (305) 640-1345 CA No. 7538 Who is hereinafter called Consultant or Engineer and who is to act as City's representative, assume all duties and responsibilities and have the rights and authority assigned to Consultant in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. 13.4 CONTRACT DOCUMENTS. The Contract Documents which comprise the entire Agreement between City and Contractor, defined in Section 5.1 of the General Conditions and incorporated herein, concerning the Work consist of the following: Ust of Drawings Legal Advertisement/Notice to Bidders Instructions to Bidders General Conditions Supplementary Conditions Bid Response Sheet/Bid Form Bid Bond Bidder Qualifier Statement Non-Collusive Affidavit Public Entity Crimes Notice of Award Draft Agreement Notice to Proceed Form of Payment Bond Form of Performance Bond Acknowledgement of Conformance with OSHA Standards Equal Opportunity / Affirmative Action Statement Conflict of Interest Statement Dispute Disclosure Form Anti-Kickback Affidavit Bid Checklist General Requirements: Summary of Work Special Coordination Special Coordination Franchised and other Private Facility Measurement and Payment Processing Application for paymemt Construction Scheduling Shop Drawings Trench Safety Design Trench Safety Program Standard Specifications and Details Regulatory Requirements PAGE 64 OF 130 BlD No. 08-10-01 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Section 8 Section 9 Section 10 Section 11 Section 12 Section 13 Section 14 Section 15 Section 16 Section 17 Section 18 Section 19 Section 20 Section 21 Section 22 Section 23 Section 24 Section 25 Section 26 Section 27 Section 28 Section 29 Section 30 Section 31 Section 32 Section 33 References and Standards Quality Control Unfavorable Construction Conditions Facility Testing dose Out Documents Section 34 Section 3S Section 36 Section 37 TechniCiJISpecirtcations: Project Area Preparation Architectural Pavers Irrigation System Landscaping Existing Tree Relocation Specialluminaire Units 2007 FOOT Standard Specifications for Road and Bridge Construction Section 02222 Section 02515 Section 02810 Section 02900 Section 02910 Section 715 DRAWINGS: DESCRIPTION LANDSCAPE PLANS COMPONENT Key Sheet Tabulation of Quantities General Notes Landscape Notes Plant Schedule and Planting Details Existing Tree Inventory (SRAIA / Collins Avenue) Existing Tree Inventory (Intersection of Collins Avenue and Sunny Isles Blvd.) Existing Tree Index Chart Landscape Plan (SRAINCollins Avenue) Landscape Plan (Intersection of Collins Avenue and Sunny Isles Blvd.) Promenade layout Plan (SRAINCollins Avenue) Site Details Irrigation Plan (SRAINCollins Avenue) Irrigation Plan (Intersection of Collins Avenue and Sunny Isles Blvd.) Irrigation Legend Irrigation Notes Irrigation Details ROADWAY PLANS COMPONENT Key Sheet Typical Section Construction Notes I Tabulation of Quantities Roadway Plans Verified Utility Information UGHTING PLANS COMPONENT Key Sheet Tabulation of Quantities General Notes Pole Data and legend Lighting Plans Landscape lighting Data and Legend Landscape Lighting Plans Lighting Details PAGE 65 OF 130 BID No. 08-10-01 SHEET NO. lD-l LO-2 LD-3 LD-4 LD-S LD-6 - LD-9 LD-lO LD-ll - LD-13 LD-14 - lO-17 LD-18 LD-19 -lD-23 lD-24 - LD-26 LD-27 - LD 30 LD- 31 LD-32 LD- 33 LD- 34 - LD- 35 1 2 3 4-6 7 L-l L-2 L-] L-4 L-5 - L-7 L-8 - L-9 l-10 - L-12 L-13 - L-18 13.5. CONTRACT TIME. The Work will be substantially completed within 150 calendar days after the date when the Contract Times commence to run and be completed and shall be ready for final payment within 180 calendar days after the date when the Contract Times commence to run. 13.6. UOUIDATED DAMAGES. The City and Contractor realize that time is of the essence of this Agreement and that City will suffer financial loss if the Work is not completed within the times speCified in this section, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by City if the Work is not completed on time. Accordingly, instead of requiring any such proof, City and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay City One Thousand Five Hundred and 00/100 dollars ($1,500.00) for each day that expires after the time specified above for the Substantial Completion Date and the actual date of Substantial Completion. Furthermore, if Contractor shall neglect, refuse, or fail to complete the Project by the Project completion date or any proper extension thereof granted by City, then Contractor shall pay the City One Thousand and 00/100 dollars ($1,000.00) for each day that expires after the time specified for completion and readiness for final payment and the actual date of completion and readiness for final payment. 13.7. INCENTIVE BONUS. The Oty desires to expedite construction on this Contract to minimize the inconvenience to the public and to reduce the time of construction. In order to achieve this, an incentive provision is established for the Contract. If Contractor is entitled to an increase in the Contract Price as a bonus for completion of the Work prior to the time specified for completion and readiness for final payment, the Contract Price will be increased by the sum of One Thousand FIVe Hundred and 00/100 dollars ($1,500.00) for each calendar day up to a maximum of thirty (30) calendar days the Project is fully complete prior to the time specified for completion and readiness for final payment and the actual date of completion and readiness for final payment 13.8. COMPENSATION. Payment to Contractor for all charges under this Agreement shall be in accordance with this Agreement and the schedule of charges reflected in the Contract Documents. Contractor shall submit invoices on a monthly basis within ten (10) days following the end of each calendar month. City shall pay Contractor only for work actually completed. The Contractor shall make no other charges to the City for supplies, labor, taxes, licenses, permits, overhead or any other expenses or costs unless any such expense or cost is incurred by Contractor with the prior written approval of the City. If the City disputes any charges on the invoices, it may make payment of the uncontested amounts and withhold payment on the contested amounts until they are resolved by agreement with Contractor. 13.9. INDEPENDENT CONTRACTOR RELATIONSHIP. The Contractor is an independent contractor and shall be treated as such for all purposes. Nothing contained in this Agreement or any action of the parties shall be construed to constitute or to render the Contractor an employee, partner, agent, shareholder, officer or in any other capacity other than as an independent contractor other than those obligations which have been or shall have been undertaken by the City. Contractor shall be responsible for any and all of its own expenses in performing its duties as contemplated under this Agreement. The City shall not be responsible for any expense incurred by the Contractor. The City shall have no duty to withhold any federal income taxes or pay Social Secur~ services and that such obligations shall be that of the Contractor, other than those set forth in this Agreement Contractor shall furnish its own transportation, office and other supplies as it determines necessary in carrying out its duties under this Agreement. 13.10. OWNERSHIP OF DOCUMENTS AND EOUlPMENT. All documents prepared by the Contractor pursuant to this Agreement and related Services to this Agreement are intended and represented for the ownership of the City only. Any other use by Contractor or other parties shall be approved in writing by the City. If requested, Contractor shall deliver the documents to the City within fifteen (15) calendar days. PAGE 66 OF 130 BID No. 08-10-01 13.11. INDEMNIFICATION. Contractor agrees to indemnify, defend and hold harmless, the Oty, its officers, agents, and employees from, and against, any and all claims, actions, liabilities, losses and expenses including, but not limited to, attorney's fees for personal, economic or bodily injury, wrongful death, loss of or damage to property, at law or in equity, which may arise or may be alleged to have risen from the negligent acts, errors, omissions or other wrongful conduct of the Contractor, agents or other personal entity acting under Contractor's control in connection with the Contractor's performance of Services pursuant to that Agreement and to that extent the Contractor shall pay such claims and losses and shall pay all such costs and judgments which may issue from any lawsuit arising from such claims and losses including wrongful termination or allegations of discrimination or harassment, and shall pay all costs and attorneys' fees expended by the City in defense of such claims and losses including appeals. The parties agree that ten percent (10%) of the total compensation is a specific consideration from the City to the Contractor for this indemnity. Contractor shall, at its own sole cost and expense, during the period of any work being performed under this Agreement, proaJre and maintain the following minimum insurance coverage to protect the City and Contractor against all loss, claims, damage and liabilities caused by Contractor, its agents, Contractor's or employees, as more particularly set forth below and in conformity with the specific insurance categories referenced in Section 5.14 of the General Conditions to the Contract Documents: General liability insurance, including broad form contractual liability coverage for all operations, including but not limited to, contractual, products, and completed operations, personal injury and property damage liability with minimum limits of Two Million Dollars ($2,000,000) combined single limit occurrence. Worker's compensation insurance at the statutory amount to apply for all employees in compliance with the ''Workers' Compensation Lawn of the State of Florida and all applicable federal laws. In addition, the policy(ies) must include: Employers' Liability at the statutory coverage amount. The Contractor shall further insure that all of its Sub- Contractors maintain appropriate levels of worker's compensation insurance. Business Automobile Liability which shall include coverage for all owned, non-owned and hired vehicles for minimum limits of not less than One Million Dollars ($1,000,000) per occurrence combined single limit for Bodily Injury Liability and Property Damage Liability. Such insurance shall not diminish Contractor's indemnification obligations hereunder. The insurance policy shall be issued by such company, in such forms and with such limits of liability and deductibles as are acceptable to the City and shall be endorsed to be primary over any insurance, which the City may maintain. Prior to the execution of this Agreement, and at any time upon request, Contractor shall furnish to the City certificates of insurance evidencing the minimum required coverage and appropriately endorsed for contractual liability with the City named as an additional insured. All policies shall contain a waiver of subrogation endorsement. All policies and certificates shall be in forms and issued by insurance companies acceptable to the City's Risk Management Department. All insurance policies and certificates of insurance shall provide that the policies may not be canceled or altered without thirty (30) calendar days prior to written notice to the City's Risk Management Department. The City reserves the right from time to time to change the insurance coverage and limits of liability required to be maintained by Contractor hereunder. 13.12. TERMINATION. PAGE 67 Of 130 BID No. 08-10-01 If, through any cause within reasonable control, the Contractor shall fail to fulfill in a timely manner or otherwise violate any of the covenants, agreements or stipulations material to this Agreement, the Oty shall have the right to terminate the Services then remaining to be performed. Prior to the exerdse of its option to terminate for cause, the City shall notify the Contractor of its violation of the particular terms of the Agreement and grant Contractor ten (-10) days to cure such default. If the default remains uncured after ten (10) days the Oty may terminate this Agreement. In the event of termination, all finished and unfinished documents, data and other work product prepared by Contractor (and sub Contractor(s)) shall be delivered to the City and the Oty shall compensate the Contractor for all Services satisfactorily performed prior to the date of termination, as provided in Paragraph 13.15 herein. Notwithstanding the foregoing, the Contractor shall not be relieved of liability to the City for damages sustained by it by virtue of a breach of the Agreement by Contractor and the Oty may reasonably withhold payment to Contractor for the purposes of set-off until such time as the exact amount of damages due the City from the Contractor is determined. Termination for Convenience of Citv. The City may, for its convenience and without cause terminate the Services then remaining to be performed at any time by giving Contractor ten (10) days written notice. The terms of Paragraph 13.8 shall be applicable hereunder. Termination for Insolvencv. The City also reserves the right to terminate the remaining Services to be performed in the event the Contractor is placed either in voluntary or involuntary bankruptcy or makes any assignment for the benefit of creditors. 13.13. ARBITRATION. It is the intention of the parties that whenever possible, if a dispute or controversy arises hereunder then such dispute or controversy shall be settled by arbitration in accordance with the procedures, rules and regulations of the American Arbitration Association. The decision rendered by the Arbitrator shall be final and binding upon the parties and judgment upon the award rendered by the arbitrator may be entered in any court having jurisdiction. Arbitration shall be held in Miami-Dade County, Florida. All costs of arbitration and attorneys' fees incurred by the parties shall be paid by the non-prevailing party or, if neither party prevails on the whole, each party shall be responsible for a portion of the costs of arbitration and their respective attorneys' fees as may be determined by the court on confirmation. 13.14. CONFIDENTIAL INFORMATION. The Contractor shall not, either during the term of this Agreement or any time for a period of TEN (10) years subsequent to that date upon which the Contractor shall leave the employment of the City for any reason whatsoever, disclose to any person or entity, other than in the discharge of the duties of the Contractor under this Agreement, any information which the City designates in writing as "confidential." As a violation by the Contractor of the provisions of this Section could cause irreparable injury to the City and there is no adequate remedy at law for such violation, the City shall have the right, in addition to any other remedies available to it at law or in equity, to enjoin the Contractor in a court of equity for violating such provisions. 13.15. NOTICES. All notices and other communications required or permitted to be given under this Agreement by either party to the other shall be in writing and shall be sent (except as otherwise provided herein) (i) by certified or registered mail, first class postage prepaid, return receipt requested, (ii) by guaranteed overnight delivery by a nationally recognized courier service, or (iii) by facsimile with confirmation receipt (with a copy simultaneously sent by certified or registered mail, first class postage prepaid, return receipt requested or by overnight delivery by traditionally recognized courier service), addressed to such party as follows: PAGE 68 OF 130 BID NO. 08-10-01 If to the City: A. John SZeriag With a copy to: City Manager Hans Ottinot City of Sunny Isles Beach City Attorney 18070 Collins Ave. City of Sunny Isles Beach Sunny Isles Beach, Florida 33160 18070 Collins Avenue Ph: 305-792-1701 Sunny Isles Beach, Florida 33160 Ph: 305-792-1702 If to the Contractor: 13.16. GOVERNING LAW. This Agreement shall be governed by and construed in accordance with the laws of the State of Florida. Venue shall be in Miami-Dade County, Florida. 13.17. AUDIT. The Contractor shall make available to the City or its representative all required financial records associated with the Agreement for a period of THREE (3) years. 13.18. NON-DISCRIMINATION. The Contractor agrees to comply with all local and state civil rights ordinances and with Title VI of the Civil Rights Act of 1984 as amended, Title VIII of the CMI Rights Act of 1968 as amended, Title 1 of the Housing and Community Development Act of 1974 as amended, Section 504 of the Rehabilitation Act of 1973, the Americans with Disabilities Act of 1990, the Age Discrimination Act of 1975, Executive Order 11063, and with Executive Order 11248 as amended by Executive Orders 11375 and 12086. The Contractor will not discriminate against any employee or applicant for employment because of race, color, creed, religion, ancestry, national origin, sex, disability or other handicap, age, marital/familial status, or status with regard to public assistance. The Contractor will take affirmative action to insure that all employment practices are free from such discrimination. Such employment practices include but are not limited to the following: hiring, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff, termination, rates of payor other forms of compensation, and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the City setting forth the provisions of this non- discrimination clause. The Contractor agrees to comply with any Federal regulations issued pursuant to compliance with Section 504 of the Rehabilitation Act of 1973 (29 U.S.c. 708), which prohibits discrimination against the handicapped in any Federally assisted program. 13.19. CONfliCT OF INTEREST. The Contractor agrees to adhere to and be governed by the Miami- Dade County Conflict of Interest Ordinance Section 2-11.1, as amended and by the City of Sunny Isles Beach Ordinance No. 99-82, which are incorporated by reference herein as if fully set forth herein, in connection with the Agreement conditions hereunder. The Contractor covenants that it presently has no interest and shall not acquire any interest, direct or indirectly which should conflict in any manner or degree with the performance of the Services. The Contractor further covenants that in the performance of this Agreement, no person having any such interest shall knowingly be employed by the Contractor. No member of, or delegate to the Congress of the United States shall be admitted to any share or part of this Agreement or to any benefits arising there from. 13.20. ENTIRE AGREEMENT. This Agreement and the Contract Documents as defined in Section 5.1 of the General Conditions to the Contract Documents, which is expressly incorporated herein by PAGE 69 OF 130 BID No. 08-10-01 reference, contain the entire agreement of the parties, and may be amended, waived, changed, modified, extended or rescinded only by a writing signed by the party against whom any such amendment, waiver, change, modification, extension and/or rescission is sought. IN WITNESS WHEREOF, the parties hereto have executed this Agreement in triplicate on the day and year first written above. WITNESSES: COMPANY'S NAME BY: Company CITY OF SUNNY ISLES BEACH ATTEST: BY: Norman S. Edelcup, Mayor BY: Jane A. Hines, CMC, City Clerk APPROVED AS TO FORM AND LEGAL SUFFICIENCY BY: Hans Ottinot, City Attorney END OF SECTION PAGE 70 OF 130 BID No. 08-10-01 SECTION 14 NOTICE TO PROCEED TO: DATE: PROJECT DESCRIPTION: SR AlA/Collins Avenue Streetscape Improvements, Bid No. , in accordance with Plans Contract Documents as prepared by O'Leary Richards Design Associates and Alvarez Engineers, Inc. You are hereby notified to commence Work in accordance with the Agreement dated on or before And you are to fully complete the Work and have it ready for final payment within 180 calendar days thereafter. The date of completion of the Work in full is therefore Crty of Sunny Isles Beach BY: A. John Szerlag, Oty Manager ACCEPTANCE OF NOTICE TO PROCEED Receipt of the above Notice to Proceed is hereby acknowledged by this day of ,20__ BY: TITLE: You are required to return an acknowledged copy of this Notice to Proceed to the City. END OF SECTION PAGE 71 OF 130 BJo No. 08-10-01 SECTION 15 FORM OF PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS: That, pursuant to the requirements of Florida Statute 255.05, we, , as Principal, hereinafter called Contractor, and, as Surety, are bound to the City of Sunny Isles Beach, Florida, as Obligee, hereinafter called City, in the amount of [type in amount ] Dollars ($ ) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally. WHEREAS, Contractor has by written agreement entered into a Contract, Bid/Contract No. 08-10- 01, awarded the day of , 20 , for the SR AlNCollins Avenue Streetscape Improvements Project in accordance with contract documents prepared by the City of Sunny Isles Beach, which Contract is by reference made a part hereof, and is hereafter referred to as the Contract; THE CONOmON OF THIS BOND is that if the Contractor: 15.1. Indemnifies and pays City all losses, damages (specifically including, but not limited to, damages for delay and other consequential damages caused by or arising out of the acts, omissions or negligence of Contractor), expenses, costs and attorney's fees including attorney's fees incurred in appellate proceedings, that City sustains because of default by Contractor under the Agreement; and 15.2. Promptly makes payments to all claimants as defined by Florida Statute 255.05(1) supplying Contractor with all labor, materials and supplies used directly or indirectly by Contractor in the prosecution of the Work provided for in the Agreement, then this obligation shall be void; otherwise, it shall remain in full force and effect subject, however, to the following conditions: 15.2.1. A claimant, except a laborer, who is not in privity with the Contractor and who has not received payment for their labor, materials, or supplies shall, within forty-five (45) days after beginning to furnish labor, materials, or supplies for the prosecution of the Work, furnish to the Contractor a notice that they intend to fook to the Bond for protection. 15.2.2. A claimant who is not in privity with the Contractor and who has not received payment for their labor, materials, or supplies shall, within ninety (90) days after performance of the labor, or after complete delivery of the materials or supplies, deliver to the Contractor and to the Surety, written notice of the performance of the labor or delivery of the materials or supplies and of the non-payment. 15.2.3. No action for the labor, materials, or supplies may be instituted against Contractor or the Surety unless the notices stated under the preceding paragraphs 15.2.1 and 15.2.2 have been given. 15.2.4. Any action under this Bond must be instituted in accordance with the Notice and Time Umitations provisions prescribed in Section 255.05(2), Aorida Statutes. The Surety hereby waives notice of and agrees that any changes in or under the Contract Documents and compliance or noncompliance with any formalities connected with the Contract or the changes do not PAGE 72 Of 130 BID No. 08-10-01 affect the Surety's obligation under this Bond. Signed and sealed this day of ,20 WITNESS: BY: (Name of Corporation) Secretary (Signature) (CORPORATE SEAL) (Type Name and Title Signed Above) IN THE PRESENCE OF; INSURANCE COMPANY: BY: *Agent and Attorney-in-Fact * (Power of Attorney must be attached) (Address) (City/State/Zip Code) (Telephone) STATE OF flORIDA ) ) COUNTY OF ) . [name of person], as AFFIX NOTARY STAMP HERE: Signature: Notary Public - State of Florida Print or Type Commissioned Name Personally Known OR Produced Identification Type of Identification Produced PAGE 73 Of 130 BID No. 08-10-01 CERTIFICATE AS TO CORPORATE PRINCIPAL I, , certify that I am the Secretary of the corporation named as Principal in the foregoing Payment Bond; that , who signed the Bond on behalf of the Prindpal, was then of said corporation; that I know his/her their signature; and his/her their signature thereto is genuine; and that said Bond was duly signed, sealed and attested to on behalf of said corporation by authority of its governing body. (CORPORATE SEAL) NAME OF CORPORATION SECRETARY OF CORPORATION END OF SECTION PAGE 74 OF 130 Bm No. 08.10.01 SEcnON 16 FORM OF PERFORMANCE BOND KNOW ALll\1EN BY THESE PRESENTS: That, pursuant to the requirements of Aorida Statute 255.05, we, , as Prindpal, hereinafter called contractor, ClDd . as Surety, are bound to the City of Sunny Isles Beach, Florida, as Obligee, hereinafter called City, in the amount of Dollars ($ ) for the payment whereof Contractor and SUrety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and serer-ally. WHEREAS, Contractor has by written agreement entered into a Contract, Bid/Contract No.: 08- 10-01, awarded the day of , 20 , with SR A1NCollins Avenue Streetscape Improvements in accordance with contract documents prepared by O'leary Richards Design Associates, [oc. and Alvarez Engineers, loe., which Contract is by reference made a part hereof, and is hereafter referred to as the Contract; THE CONDmON OF THIS BOND is that if the Contractor: 16.1. Ful/y' performs the Contract between the Contractor and the SR AlA/Collins Avenue Streetscape Improvements (Bid No. 08-10-01) within calendar days after the date of Contract commencement as specified in the Notice to Proceed and in the manner prescribed in the Contract; and 16.2. Indermifies and pays Gty all losses, damages (specifically including, but not limited to, damages for delay am other consequential damages caused by or arising out of the acts, omissions or negligence of Contracto r), expenses, costs and attorney's fees including attorney's fees incurred in appellate proceedings, that Oty sustains because of default by Contractor under the Contract; and 16.3. Upon notification by the Oty, corrects any and all defective or faulty Work or materials which appear with ill one and one half (1 1/2) years, and: 16.4. Performs the guarantee of all Work and materials furnished under the Contract for the time specified in the Contract, then this Bond is void, otherwise it remains in full force. Whenever Contractor shall be, and declared by City to be, in default under the Contract, the City having performed Oty's obligations thereunder, the Surety may promptly remedy the default, or shall promptly: 16.4.1. Complete the Contract in accordance with its terms and conditions; or 16.4.2 Obtain a Bid or Bids for completing the Contract in accordance with its terms and conditions, and upon determination of the Surety of the lowest, responsible and responsive Bidder, or, if the City elects, upon determination by the City, and Surety jointly of the lowest, responsible and responsive Bidder, arrange for a Contract between such Bidder and Oty, and make available as Work progresses (even though there should be a default or a succession of defaults under the Contract or Contracts of completion arranged under this paragraph) suffident funds to pay the cost of completion less the balance of the Contract Price; but not exceeding, including other costs and damages for which the Surety may be liable hereunder, the amount set forth in the first paragraph hereof. The term "balance of the Contract Price." as used in this paragraph, shall mean the total amount payable by City to Contractor under the Contract and any amendments thereto, less the amount properly paid by City to Contractor. PAGE 75 Of 130 BID No. 08-10-01 No right of action shall accrue on this Bond to or for the use of any person or corporation other than the City named herein. The Surety hereby waives notice of and agrees that any changes in or under the Contract Documents and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Surety's obligation under this Bond. Signed and sealed this day of ,20 WITNESS: BY: (Name of Corporation) Secretary (Signature) (CORPORATE SEAL) (Type Name and Title Signed Above) IN THE PRESENCE OF; INSURANCE COMPANY: BY: *Agent and Attorney-in-Fact * (Power of Attorney must be attached) (Address) (City/State/Zip Code) (Telephone) STATE OF FLORIDA COUNTY OF . [name of person], as AFFIX NOTARY STAMP HERE: Signature: Notary Public - State of Florida Personally Known Print or Type Commissioned Name OR Produced Identification PAGE 76 OF 130 BID No. 08-10-01 Type of Identification Produced CERTIFICATE AS TO CORPORATE PRINCIPAL I, , certify that I am the Secretary of the corporation named as Principal in the foregoing Payment Bond; that , who signed the Bond on behalf of the Principal, was then of said corporation; that I know his/her their signature; and his/her their signature thereto is genuine; and that said Bond was duly signed, sealed and attested to on behalf of said corporation by authority of its governing body. (CORPORATE SEAL) NAME OF CORPORATION SECRETARY OF CORPORATION END OF SECTION PAGE 77 OF 130 BID No. 08-10-01