1.5.1 HISTORY OF THE FIRM
MCM is a family-owned company that was established in
Miami, Florida over 25 years ago. The ownership and top
management of the firm is in the hands of the Munilla family
whose construction background dates back to 1940 when
Fernando R. Munilla pioneered construction methodol-
ogy and systems specializing in pre-cast, pre-stressed and
heavy structural construction in Cuba. The powerful fam-
ily bond and ethics instilled by Fernando Munilla Sr. are the
standards that make up today's generation. These corner-
stones, Quality, Integrity and Reliability, are a precondition to
all of MCM's goals.
Our experience includes Commercial, Civil, Educational,
Institutional and Governmental Construction. MCM has ex-
perience in every delivery method from traditional hard bid
projects to Construction Management at Risk and Design
Build deliveries. Being a Design/Builder for over 20 years
makes us especially suited to serve all of our Clients needs.
Having managed both the design and construction of park-
ing garages, schools, fire stations, train stations and many
others we have developed internal review processes to as-
sure the highest quality of construction is achieved at the
best value for the Client. This background, along with our
extremely knowledgeable and resourceful network of Archi-
tects, Engineers and expert Sub-contractors, makes us an
excellent candidate for any project.
In addition to building, garage, and park construction MCM
has performed a wide variety of Civil Work. We have the
advantage of having almost 80% of our work self-performed
for Concrete, Earth & Sitework, Underground Utilities, Road
& Bridge, and have access to a vast fleet of equipment at our
exclusive disposition. Our expert field management and la-
bor force is entirely devoted to deliver projects with the high-
est quality and safety standards, supervising the project's
development from a satellite office installed on-site.
MCM has an exceptional record in developing, project man-
aging and constructing residential and commercial projects
in South Florida. Our experience in urban development and
redevelopment projects range from small housing estates,
to high-rise apartments and large scale mixed use develop-
ments.
Last but not least, our list of completed projects also includes
a very broad experience with institutional work ranging from
Parking Garages, Hospitals, Transportation Facilities and
Correctional Facilities. MCM has an uncompromising com-
mitment to quality with an impressive track record develop-
ing, managing and constructing commercial and govern-
mental projects.
As mentioned on the pre-proposal conference, "it may be dif-
ficult to find a Parking Garage Builder that also knows how to
build Parks", but with MCM we assure you, you have found
the perfect fit. Over the next few pages we will demonstrate
it thru our team's qualifications.
I""
..
ATEMENT OF QUALIFICATIONS
1.5.2 SUMMARY OF COMPANY CHANGES
No major changes in the organization of MCM are expected
to happen during the construction of the Heritage Park &
Parking Garage.
1.5.3 OFFICE LOCATIONS
MCM Corporate Offices
6201 SW 70th Street, Second Floor
Miami, FL 33143
MCM Civil Division
1021 Ives Dairy Road, Unit # 115
Miami, FL 33179
MCM Aviation Division
4200 NW 21st St., Terminal B, 3rd Floor
Suite B-3151
Miami, FL 33122
MCM Equipment Yard
7501 NW 72nd Avenue
Medley, FL 33166
1.5.4 OFFICES INVOLVED IN THE PROJECT
Pre-construction Phase - MCM Corporate Office
6201 SW 70th Street, Second Floor
Miami, FL 33143
Construction Phase - MCM Civil Division
1021 Ives Dairy Road, Unit # 115
Miami, FL 33179
Only 4.7 miles away from the project.
'"
~
'"
en
c
~
"-
~
c
'"
Fernando Munilla - Project Executive, Responsible for :E
over 250 projects ranging in a wide variety of commercial, F
institutional, industrial and custom residential experience ~
encompassing both new structures and rehabilitation of his- ~
torical facilities. The gamut of experience ranges from ma- ~
sonry reinforced concrete, steel superstructure and modular ]
construction. Most of the projects required estimating, bid- .~
ding and negotiations in addition to general coordination and ~
supervision; cost estimates; enforcement of quality control; ~
client negotiations and dealings with private or public sector .~
agencies. Fernando will be responsible for providing overall ij
management direction and administration for the project, in- :
c1uding: (1) initiate and maintain liaison with the City of Sun- ~
ny Isles Beach in order to ease construction activities; (2) ~
Monitor/control construction through administrative direction ~
of project manager and superintendents; and (3) Establish ~
project objectives, policies, procedures and performance .
1
1.5.5 CONTRACTOR'S PROJECT TEAM
standards. A more detailed list of projects can be found on
Fernando's Resume at the end of the proposal.
Gus Fernandez, Sr. Project Manager - Gus has close to 20
years experience in construction, with emphasis on govern-
mental and institutional facilities. He is an expert scheduler
and has experience working at Parking Facilities giving him
an edge with issues like phasing, planning for construction in
occupied sites and extensive knowledge of sub-contractors
and vendors. Gus, will be responsible for overseeing the
overall management of all construction activities for the proj-
ect, including but not limited to: Cost & Risk Management,
Schedule update, Sub-contractor & Vendor Billing, adequate
reporting to Owner and MCM Management, prepare requisi-
tion and schedules of values including updates to job cost
reports, coordination of Team Meetings to maintain clear
lines of communications. Highlights of Gus's Experience
include the Construction of Sunny Isles Beach Community
K-B Schools, which included the construction of a 4-story,
pre-cast parking garage, with 150 spaces. Additionally, he
also built GTI Central Collections Plaza for the Flamingo and
Dolphin Parking Garages, including significant modifications
to the existing garages at Miami International Airport. He
has built several parking garages for educational facilities
such as Coral Park Senior High School and Westland Hia-
leah Sf. High, which entailed the construction of a 4-story
cast-in-place garage with 150 spaces. A more detailed list
of projects can be found on Gus's Resume at the end of the
proposal.
Paul Bessell, Assistant Project Manager (PARKING) -
Paul has over 7 years experience working with clients such
as Miami International Airport, Miami-Dade County Public
Schools and more recently the City of Miami Beach. He has
experience building both parking garages and park & sports
facilities, so he is perfectly suited to assist in the supervision
of this project. A more detailed list of projects can be found
on Paul's Resume at the end of the proposal.
STATEMENT OF QUALIFICATIONS
Brook Wolfe, Assistant Project Manager (PARK) - Brook
has over 6 years Civil construction experience. She just com-
pleted the construction of South Pointe Park, a $22 million
overhaul that resulted in a "state of the art" park for the City
of Miami Beach. Her involvement in this project and her ex-
pertise with environmental issues gives her an edge to over-
see the construction of Heritage Park. Brook will be respon-
sible for the overall management of all construction activities
related to the park, . A more detailed list of projects can be
found on Brook's Resume at the end of the proposal.
Bill McCue, Superintendent - Bill has over 33 years experi-
ence in construction, with a heavy emphasis on commercial
and educational facilities in South Florida. He has extensive
experience working at commercial, multi-story facilities such
as the Heritage Parking Garage, as well as acres of devel-
opment of sports fields and playgrounds for Miami-Dade
County Public Schools giving him an edge with issues that
this project can present during construction. Bill was the su-
perintendent in charge of the construction of the Jackson
Memorial's North Parking Garage, a 5 story pre-cast facility
very similar to the Heritage Parking Garage. A more de-
tailed list of projects can be found on Bill's Resume at the
end of the proposal.
1.5.6 TEAM ORGANIZATION & RESPONSIBILITIES
In order to ensure the City the construction of the most cost-
effective project, MCM has teamed up with a group of of
specialists which will aide during the pre-construction and
construction phases to provide the best value to the City of
Sunny Isles Beach.
Florida Lemark, Structural Concrete Specialist (con-
struction) - was founded in 1987 and is family owned and g,
operated. They have been doing business in South Florida .3
for 20 years. Florida Lemark's primary focus is commercial i
construction, specializing in the construction and renova- ~
tion of parking garages. They strive to be the benchmark ~
to concrete restoration, forming, and finishing and provide ~
top quality work and service in a timely, effective, efficient, .f
innovative, and economic manner. MCM has been working ~
with Florida Lemark for the past 15 years with excellent re- ~
suits. As structural specialists, they will be responsible for .~
assessing the current design and ensure constructability at ~
the best price. Eduardo Rodriguez will be leading this team. ~
His resume can be found at the end of the proposal. ~
8
Tim Haahs, Parking Facilities Specialist I Structural 1
Concrete Specialist (Design) - established since 1994 has ~
grown into a reputable organization composed of 52 employ- ~
ees dedicated to designing parking structures. A multi-disci- ~
plined engineering and architectural firm, TimHaahs special- ~
izes in providing design services for parking and mixed-use ~
buildings. They focus on parking solutions, bringing a unique ..
perspective to their clients in private and public sectors. 2
O'Leary. Richards Design Associates Inc., Landscape
Professl.onals I Pa~k Development Specialist (Design)
(ORDA) IS a full service Landscape Architecture firm based
in Miami, Florida. Having been in continual operation since
1 ~69, ORDA currently provides Landscape Architectural ser-
vices for the.institutional, municipal, and private sectors.
The completion of hundreds of successful projects has made
ORDA leaders in subtropical Landscape Architecture. ORDA
has b~ilt. a solid repu.tation for completing projects on time,
and within budget, without sacrificing design quality. ORDA
provi~es. ~ontinuity. and coo~di.n.ation through all phases of
each indiVidual project, from Initial planning, through design
and construction administration.
Vila & Sons, Landscape Professionals I Park Devel-
opment Specialis~ (~onstr~cti~n) - among the largest
landsc.ape companies In Flonda IS a full service operation
~ompnsed of land~cape development, irrigation construc-
tion! landscape maintenance, nursery and tree farms. This
family-owned and operated enterprise has thrived since its
inception .in 1984, experiencing continuous geometric and
geographic gro~th. MCM has worked with this company for
over 5 years with excellent results. Ariel Caballero will the
leader assigned to this project. His resume can be found at
the end of the proposal.
During the construction process MCM will have as part of
their team the following consultants and sub-contractors to
be responsible for the services required on the RFQ:
~ield Verification & Surveying - MCM. We have certi-
fied personnel and surveying equipment that will be used
throughout this project.
Geote.chnical Ex~loration,.Testing & Verification I Utility
Location & Planning I Environmental Considerations -
Dunkelberger Engineering & Testing. Founded in 1994
~unke.lberger's miss!on has been to offer geotechnical en~
glne~nng an~ matenals. testing services of distinguishable
quality and with personalized attention to client service. They
have grown to a present staff of 70+ in five office locations.
Dunkelberger offers comprehensive geotechnical services
ranging fr~m site. explorationl characterization, including lab-
oratory sOils testing, to design recommendations for founda-
tions, fl.oor slabs, ~avements, borrow, and ponds. Although
no en~lronmental !ssues are foreseen according to the in-
formatron we received at the pre-proposal conference, this
c~.mpany als~ offers environmental services including due
diligence studies, evaluation of contaminated soil, sediment
and groundwater, as well as groundwater monitoring.
Traffic Flow and Interim Parking Issues - MCM - Our
tea~ will be responsible. for managing any possible inter-
rup~lons to traffic on Collins Avenue thru a comprehensive
Maintenance of Traffic Plan (MOT). We have trained MOT
STATEMENT OF QUALIFICATIONS
~~~ 1~',4tcm
TimHaa 5
ENGINEERS ARCHITE
125
~ FLORIDA LEMARK
=CORPORATION
_ GENERAL CONTRACTORS. CGCOS7870
YEARS &
GROWING
Professionals, with extensive experience diverting traffic in
the safest and most convenient way to the travelling public.
MCM has worked on many Civil projects including 1-95 Man-
aged Lanes and the MDX State Road 836 Toll Plaza Exten-
sion, which required very complex MOT plans. We ensure
an excellent job for the City of Sunny Isles Beach as we have
d?ne for other clients in the past. The Interim Parking Issues
Will be addressed by a staging plan, that will assure full sat-
isfaction to the City and the community at large.
Landscape. Coordination & Staging - MCM - Vila & Sons -
MCM a~d Vila have collaborated for the past 10 years in sev-
eral pr?jects, but, mo.re recently we completed the premier
recreational location In South Beach - South Pointe Park a
19 acre facility with amenities including intricate landscapi~g
features includin~ water .f~untain?, splash pads and play-
ground areas. ThiS $22 million project was delivered on time
and within .bud~et to the City of Miami Beach, and opened
to the publiC thiS past March 22nd. Vila-n-sons is one of the
larQest and more reputable landscaping contractors in the
region, and we are proud to have them as part of our Team.
'"
en
~reparation of cOll~plete As-Built drawings - MCM. With !
In-hous~ CADD certlfl~d perso~nel MCM will be responsible ~
for creating and updating as-bUilt drawings. ~
'"
-"<
Possible Public Involvement ~
MCM has secured the services of Mr. Bob Welsh to serve as .f
"Coml!l.unity ~iaison", being one of the most "public" of pri- ~
vate Citizens I~ Sun~x Isles Beach. ~r. Welsh has a history ~
as a community activist and champion of causes including .~
th~ eff.o~ to .develop Sunny Isles Beach first public school. ~
ThiS CIVIC minded approach along with his intimate aware- .~
ness of the nee~s and concerns of th.e citizens of Sunny Isles J
Beach makes him extr.emely well s~lted to serve as a bridge ~
between the Community and MCM In the construction of the 'E;
garage. and park. This will assure MCM is not only building ~
~he project but IS a~are of and responsive to any issues aris- ~
Ing from construction that may affect the community. . ~
=
d
:z:
~
""
.
3
STATEMENT OF QUALIFICATIONS
Scope of Work
Consisted of an extensive phasing plan, which required
continual coordination between the Construction Teams
in order not to interrupt Hospital Operations. Phase 1 of
the .proJect ~onsis~ed of a new pre-cast Parking Garage, 5
stories In height with the capacity to expand 2 more stories
for a total of 7. This creative engineering allowing for future
growth required over 700 piles and more than 60 pile
caps. Additionally the parking facility required steel bridge
superstructure spanning over 180 feet in length in order to
allow the pedestrian safe access into the Hospital. Phase
2 consisted of building an Oxygen Tank Farm in order to
r~locate the main Oxygen and Nitrogen supply to the hospital
Without the affecting the existing and incoming patients.
Dollar Value of Project
$17,804,520
Client Reference
Public Health Trust
Jose Vega
(Owner's Representative)
Corradino Architects
(305) 970.3682
GTI CENTRAL COLLECTIONS PLAZA
Scope of Work
Construction of new toll collection facilities, parking revenue
control system, roadways and infrastructure encompassing
a 12 acre site within Miami International Airport.
Scope of Work; GTI Central Collections Plaza Project was
a 2001 Contract which at that time had a value of 23 Million
dollars, the project consisted of 11 acres of demolition, tree
relocation, underground utilities, earthwork, roadwork and
the construction of a new Parking Revenue Control F~cility
comparable to a highway toll facility, which included a new
plaza with 1 acre of colored pavers installed over reinforced
concrete aprons, a 17,000 sf administration building, 16 exit
lanes, 6 entry lanes and 6 remote entry gates. All work was
done at the main entrance of Miami International Airport
while maintaining full access to and through the elevated
parking garage system for Airport patrons.
MCM self performed the following scope of work:
. Major Upgrades to Flamingo and Dolphin Parking
Garages including resurfacing of all levels, new
signalization, etc.
. Demolition of Existing Roadways, Bridges, and UIG
Structures
. Installation of 5000+ lin. Ft. of water mains
. Installation of 200+/- Drainage Structures and 4000 lin. ft
of related piping
. Excavation and Concrete Placement at 5000+ lin. Ft of
Electrical Ductbank
. I~stallation of 5000+ sq. yds of stabilized subgrade,
Ilmerock base, and concrete paving.
Dollar Value of Project
$22,840,977
'"
g>
<;
'"
g>
~
"-
~
c
'"
-'"
cE
'"
en
'"
'"
:>::
'"
~
'"
'"
Scope of Work .;;
Design~Build ~f ~ new Senior High School complex composed i
of multiple bUildings, EHPA and courtyards to house 1 839 ~
student stations (322,084 SF). The organization will be based ~
on a "School-within-a-School" concept for grades 9-12 with .~
general classrooms, administration, student services media ~
cen~er, .art, sc.ience, v.ocational classrooms, labs, a c~mplete ~
auditOrium With musIc labs, full cafeteria and kitchen with ~
interior and exterior dining and full gymnasium/physical ~
education facility with required play fields, drop-offs. One of e
the key components of the project was a multi-story parking ..
garage constructed on pilings and grade beams in a coastal 4
Client Reference
Miami International Airport
Max Fajardo
Deputy Director
305-876-7129
SUNNY ISLES BEACH COMMUNITY K-8
Parking Garage
1.5.7 RECENT PROJECT EXPERIENCE (MCM)
the key components of the project was a multi-story parking
garage constructed on pilings and grade beams in a coastal
environment. The parking garage included an elevator and
occupied areas at ground level, with physical education and
custodial uses.
Dollar Value of Project
$31,778,790
Client Reference
Dennis Caserta, Senior Project Manager
Miami-Dade County Public Schools
305-995-4860
WESTLAND HIALEAH SR. HIGH
Scope of Work
Design-Build of a new Senior High School complex
composed of multiple buildings, EHPA and courtyards to
house 1,839 student stations (322,084 SF). One of the
key components of the project was a multi-story, 150-
space, cast in place parking garage that incorporated a
rooftop gymnasium which included new air conditioned
basketball courts, male and female lockers, weight rooms,
STATEMENT OF QUALIFICATIONS
classrooms and other conditioned spaces; along with open
air hard courts for basketball, volleyball and other sports,
also on the rooftop of the multi-story parking garage.
Dollar Value of Project
$51,456,818
Client Reference
Dennis Caserta, Senior Project Manager
Miami-Dade County Public Schools
305-995-4860
SOUTH POINTE PARK
This project consists of the renovation of a 19 acre Park,
including extensive site work, underground utilities, the
construction of new walk along the coastline, parking lot
renovation and addition, construction of a new Pavilion, ~
Playground and other Accessory Buildings. Construction '!
of a 13' High Serpentine Land Form. Water features, ~
Improvements to Smith & Wollensky Restaurant Patio ~
,& Entrance. Additionally this project is located in an i
environmentally sensitive area, which includes dealing with ~
endangered species and delicate environments like Native .~
Dunes. Extensive Pruning, Replanting and new Landscaping ~
& Irrigation Construction are also a main component of this ~
job. .~
V>
c
'"
"I
'"
'-'
]
~
"-
Dollar Value of Project
$ 22,435,764
Client Reference
Mario Gonzalez Pola
Sr. Capital Improvements Coordinator
City of Miami Beach
305-673-7071
c;
8
d-
e:>
ci
:z:
~
'"'
.
5
STATEMENT OF QUALIFICATIONS
1.5.7 RECENT PROJECT EXPERIENCE (FLORIDA LEMARK)
UM MEDICAL STAFF PARKING GARAGE DOLPHIN STADIUM PH 18
University of Miami, Coral Gables, FL 2269 Dan Marino Boulevard, FL
Description:
Owner:
GC:
Reference:
Contract:
Completion:
Washpours, sealant, barrier cables,
University of Miami
Moss & Associates
Mr. James Langfitt (305) 243-7945
$1,382,575
2008
MEMORIAL REGIONAL HOSPITAL HPU
3501 Johnson Street, Hollywood, FL 33021
Description:
Owner:
GC:
Reference:
Contract:
Completion:
Concrete Repairs; carbon fiber
reinforcement,
Memorial Health Care System
Balfour Beatty Construction
Mr. Kevin Dean (954)962-5772
$1,084,627
2008
Description:
Owner:
GC:
Reference:
Contract:
Completion:
Waterproofing Membrane & Misc. Repairs
South Florida Stadium Corporation
Stiles Construction Co.
Mr. Richard Trummer (954) 494-6297
$1,585,181
2008
HOMESTEAD HOSPITAL REPLACEMENT FACILITY
3375 NE 8th Street, Homestead, FL
Description:
Owner:
'"
en
'"
'"
'"
en
c
:;;
~
]
-'"
~
'"
en
'"
'"
::t:
'"
~
~
'"
.~
Installation of precast components, wash ~
pours, sealant, elevator pit waterproofing 1
Baptist Health South Florida dlbla .3
Homestead Hospital Replacement Facility 1
Skanska USA Building, Inc. ~
Mr. Andy Allen (305) 245-6174 j!
$1,609,800
2008
GC:
Reference:
Contractt:
Completion:
~
=
g;
ci
:z:
~
""
.
6
STATEMENT OF QUALIFICATIONS
1.5.7 RECENT PROJECT EXPERIENCE (FLORIDA LEMARK)
17TH STREET PARKING GARAGE SOUTH MIAMI HOSPITAL PARKING GARAGE
640 and 17th Street, Miami Beach, FL 6200 SW 73rd Street, Miami, FL
.~1~~
.4."'....
"(:'1~: r~;::~~~~,.
", '" " I I l'''',,~.... ' .-.;.
' '''"I; I!JI~"~ ~:'"
,.:1'.(,. 1 ~.~::....,.. :',.",'<. ";~"'"
~J/,J., III ......~..:::~::.:..~~>"".,. " Il~.'~:~..~,~:;:.~,..
P , ,I ']' .....,.~ . , . """:- . '." ....;,_,
.. '" '-,,' .... ' ~~ ""'..
. ..... ,....;~.-.. "\;I, .
;)' ./.J./. "". , ,~.......---.~~.....,.,!,,-:;~
..~r!,",~..,.,. .,' "" ~..~
.... .<>""....~, ..~,-. . ...., ~
J .... .........:::.-~..._ _
. J.' ft~.".."" "-j~~. .l}l~~
~ ...'< 1"'lIP':Jj' . : .. d ,
~l.'(:.J t.f/- I, ,,:~;:lf .~. ~~'. .:' .~-:o;; .
" f. ll'J "4 ~
-~ Ifl..__'~~
.r ldc-r~ ~
,,': -oJ'
Description:
Owner:
GC:
Reference:
Contract:
Completion:
Concrete restoration and waterproofing
City of Miami Beach
Florida Lemark Corporation
Mr. Hiram Siaba (305) 673-7071
$639,000
January, 2006
MUNICIPAL PARKING GARAGE # 9
2090 NW 21 Terrace, Miami, FL
Description:
Owner:
GCr:
Reference:
Contract:
Completion:
Design-Builders, Prime Contractors
City of Miami, Miami Parking Authority
Florida Lemark Corporation
Mr. Arthur Noriega (305) 373-6789
$5,540,800
July, 2006
Description:
Owner:
GC:
Grout, wash pours,sealant, strand barriers,
parking bumpers
South Miami Hospital
Turner Construction
Coreslab Structures (Miami), Inc.
Mr. Allen Witt (305) 823-8950
$1,065,000
October, 2004
Reference:
Contract:
Completion:
'"
[
'"
g'
:i<
.f
~
c
'"
-'"
.f
'"
en
.~
:I::
'"
.=
'"
'"
.~
V'O
c
'"
'6
~
.3
~
j
e
"-
~
~
<:>
ci
:z
s:
""
.
7
1.5.7 RECENT PROJECT EXPERIENCE (TIM HAAHS)
MIAMI COURTHOUSE PARKING GARAGE
------,
The Miami Parking Authority is constructing a state-of-the-
art multi-million dollar facility adjacent to the new Federal
Courthouse in downtown Miami. TimHaahs served as the
prime design firm, providing full architectural and parking
design services for this significant new facility. TimHaahs
designed the 850 space facility for a future horizontal .
expansion that would add 300 additional parking spaces.
This garage will house two retail spaces on the ground floor .
and more than 20,000 square feet of office space, including
the Miami Parking Authority's administrative offices. The .
Courthouse Center Parking Plaza's striking architectural
features, street "liners" on the second and third floor facades, .
and blue glass create a pleasing aesthetic effect. The new
facility will serve as the perfect complement to the courthouse
to its north, complete with a passive reflection park on the
corner of North Miami Avenue and Northwest 3rd Street.
Dollar Value of Project
$ 32,000,000
Client Reference
Mr. Arthur Noriega, Executive Director
Miami Parking Authority (MPA)
(P) 305.373.6789/ (F) 305.371.9451
anoriega@miamiparking.com
MIAMI PARKING AUTHORITY ON CALL SERVICES
TimHaahs provided the Miami Parking Authority with
professional parking consulting services under a three year
contract with the city through 2007.
TimHaahs represents and advises the Authority throughout
design and construction of various parking related projects.
Services begin in the preliminary schematic design phase
and continue through the end of construction, including 11th
STATEMENT OF QUALIFICATIONS
month walkthroughs. TimHaahs also provides comprehensive
Owner's Representative services, and assists MPA staff in
the following services:
. Attendance at the MPA meetings, regular or special
Conferring with and advising the offices, employees,
and members of the MPA
. Appearance for and representation of the MPA in project
meetings and negotiations
Review project documents, reports and contracts
Review and comment on all documents pertaining to
project feasibility
Review of parking management and parking operational
agreements
Research of parking and development issues, as
requested
Assist with the strategic planning and implementation of
the MPA, as requested
Client Reference
Mr. Arthur Noriega, Executive Director
Miami Parking Authority (MPA)
(P) 305.373.6789 / (F) 305.371.9451
anoriega@miamiparking.com
:g,
~
'"
en
c
~
"-
~
c
'"
-><
.E
CITY PARK MALL AESTHETIC IMPROVEMENTS .f
The City Park garage is a 2,000 space facility located in ~
the downtown district. TimHaahs provided professional ~
engineering and architectural services for the Phase 1
., V>
c
'"
'6
~
t .3
I
~
j
e
"-
~
d:
c::>
d
:z:
~
""
.
8
1.5.7 RECENT PROJECT EXPERIENCE (TIM HAAHS)
III Aesthetic Improvements to the City Park Garage in
Fort Lauderdale. TimHaahs updated and enhanced the
architectural aesthetics of the facility and significantly
improved the functionality of the garage.
Improvements include a new archway fa~ade and illuminated
signage on the east and west faces of the garage. The
fa~ade concept refinement study enhanced the selected
fa~ade concept, and identified architectural features that
improved the aesthetics of the facility. TimHaahs also made
recommendations regarding the functionality and wayfinding
for the garage.
Dollar Value of Project
$10,000
Client Reference
Ms. Diana Alarcon
City of Fort Lauderdale
Phone: 954.828.37931 Fax: 954.8283734
d ala rcon@fortlauderdale.gov
NAPLES PUBLIC PARKING FACILITY
The City of Naples' Fourth Avenue South and Eighth Street
South Parking Facility opened in the summer of 1999.
The parking structure provided much needed parking for
employees and customers of the exclusive Fifth Avenue
South shopping area, in addition to supporting the Naples
Players Theater located directly adjacent to the facility.
TimHaahs was retained as part of local architect Andrea
Clark Brown's design team to provide functional design,
structural engineering, and parking consulting services.
The construction system is precast concrete with integral
exterior beam/planter combinations, as well as aluminum
trellises. The four tier facility measures 260' x 120' and
provides 341 spaces. The functional layout is of a single
helix design using two-way traffic throughout the facility.
-
STATEMENT OF QUALIFICATIONS
Dollar Value of Project
$4,000,000
Client Reference
Ms. Andrea Clark, AlA
Andrea Clark Brown &
David Poorman Architects, PA
(P) 239.263.3898 / (F) 239.263.6025
and reab@brownpoormanarchitects.com
CITY OF NAPLES 8TH STREET GARAGE
.~~...-..
.."......-; ,..,....," ~..
< ~ " . .:.... '..
<,..<' ,. ..' l
. ~.
Tn p a u y e IC en
multi-million dollar facility that will provide much needed
additional parking for the Naples Downtown Historic District
Community. The facility is located on 8th Street South and
will serve various retail, commercial and dining areas.
The garage design incorporates several sustainable design
components. The use of a cistern linked to the sprinkler
system will collect for rain water to maintain the surrounding
landscape. The facility also features energy sufficient lighting :g,
supplied by solar panels on the top tier. In addition, the j
facility will include 328 parking spaces, 27 will be reserved E
for compact cars. ~
'"
TimHaahs teamed with Andrea Clark Brown & David :E
Poorman Architects (ACB + DPA) of Naples, Florida, also .f
the owner's project consultant. TimHaahs served as parking ~
consultant and structural engineer. ~
'"
.~
'"
c
'"
t
~
.3
~
.~
"0
d:
Dollar Value of Project
$8,000,000
Reference
Ms. Andrea Clark, AlA
Andrea Clark Brown &
David Poorman Architects, P.A.
(P) 239.263.38981 (F) 239.263.6025
and reab@brownpoormanarchitects.com
c;
8
g
ci
:z:
~
""
.
9
STATEMENT OF QUALIFICATIONS
1.5.7 RECENT PROJECT EXPERIENCE (O'LEARY RICHARDS)
TOWN CENTER PARK Founders Park is a twelve acre municipal park located in the
Sunny Isles Beach, FL City of Aventura. It is bisected by N.E. 190th Street with a 2
~ acre passive park on the south side and an active 10 acre
park on the north side. Amenities within this park include
jogging paths, tennis courts, a combination baseballlfootballl
soccer field, a community building, an outdoor amphitheater,
custom signage, and extensive landscaping and irrigation.
The park was highlighted as one of the best playgrounds in
South Florida by Parenting Magazine in 2005.
Dollar Value of Project
$2,200,000
~
~. , . .,-.
Town Center Park is a .3 acre park located on Collins
Avenue in Sunny Isles Beach. This site was environmentally
sensitive as it has a large tidally flushed wetland area. The
Landscape Architects carefully designed this park to protect
its' environmental sensitivity. Amenities within this park
include a playground, a fitcenter, open air pavilion, a jogging
path, a lifetrail for seniors and extensive landscaping.
Dollar Value of Project
$840,000
Client Reference
Jorge Vera (Asst. City Manager)
City of Sunny Isles Beach,
(305) 947-0606, jvera@sibfl.net
FOUNDERS PARK
Aventura, FL
Client Reference
Robert Sherman (Director of Community Services) City of
Aventura
305.466-8933, ShermanR@cityofaventura.com
WATERWAYS PARK
Aventura, FL
w.
'"
en
'"
"
'"
g>
:.;;;
cf
Waterways Park is a 3 acre park located on the south side of g
Gulfstream Park. The Landscape Architects carefully master :E
planned this park to protect its' mangroves. Amenities within F
this park include a recreation center, playground, a fitcenter, ~
picnic shelter, a jogging path, baseballlsoccer field, and ~
extensive landscaping. ~
.~
'"
c
'"
'€
~
'"
'-'
Client Reference ]
City of Aventura, Tony Tomei, Capital Projects Manager, i
(305) 466-8923, TomeiT@cityofaventura.com '7
5
8
g,
.;
:z
~
""
Dollar Value of Project
$4,000,000
.
10
1.5.7 RECENT PROJECT EXPERIENCE
(O'LEARY RICHARDS)
EVELYN GREER PARK
Village of Pinecrest, FL
Eve yn Greer ar IS an actJve acre par In the Vi lage
of Pinecrest. Amenities within this park include multipurpose
athletic fields (softball and soccer), batting cages, a tot lot,
a recreation center and community gazebo. This park is one
of the most highly utilized parks in South Dade and was
highlighted as one of the best playgrounds in South Florida
by Parenting Magazine in 2005. This project was completed
on time and within budget.
Dollar Value of Project
$3,000,000
Client Reference
Loren Matthews (Director of Parks and Recreation)
Village of Pinecrest, ,
(305) 234-2110, matthews@pinecrest-fl.gov
STATEMENT OF QUALIFICATIONS
1.5.7 RECENT PROJECT EXPERIENCE
(VILA & SONS LANDSCAPING)
SEMINOLE HARD ROCK CASINO
City of Hollywood, FL
Installation of automatic irrigation system, including:
Connection to water source (or well and pump), main
line installation, electric valve installation, branch piping
installation, sprinkler head installation with swing joints,
communication wire installation, controller installation,
programming, warranty. Tree transplanting, including:
root pruning, digging , relocation, transportation, hoisting,
planting, staking, watering, maintenance and warranty.
Grading and site preparation, including: demolition of
existing vegetation, fine grading, soil blanket, soil testing
and soil amendment. Subcontracted work, including:
Electrical (street lighting, landscape lighting and services
for irrigation system), Directional boring (for both electrical
and irrigation), Hardscape (flatwork, site amenities, pottery)\\
Landscape installation, including: Procurement, delivery, ~
layout, excavation, planting, staking, fine grading, mulching, ~
fertilization, interim maintenance, watering, warranty. :g
"-
~
c
"
-'"
~
'"
en
.~
::t:
'"
~
'"
'"
.5
V>
c
'"
Hardscape (flatwork, site amenities, pottery)\\Landscape .~
installation, including: Procurement, delivery, layout,]
excavation, planting, staking, fine grading, mulching, ~
fertilization, interim maintenance, watering, warranty. ]
E
"-
Value:
Contact:
Phone No:
$ 3,200,00.00
Jim Allen
954-327-7680
CITY OF SUNNY ISLES IMPROVEMENTS
City of Sunny Isles, FL
Value:
Contact:
Phone No:
$1,340,000.00
O'Leary Design Associates
Mr. Bill O'Leary I 305-596-6096 Property:
c;
~
c-
o
ci
:z:
~
""
.
11
STATEMENT OF QUALIFICATIONS
BUSCH GARDENS VELDT & RHINO RALLY
Tampa, FL
Installation of automatic irrigation system, including:
Connection to water source (or well and pump), main
line installation, electric valve installation, branch piping
installation, sprinkler head installation with swing joints,
communication wire installation, controller installation,
programming, warranty. Grading and site preparation,
including: demolition of existing vegetation, fine grading,
soil blanket, soil testing and soil amendment. Hardscape
(flatwork, site amenities, pottery)\\Landscape installation,
including: Procurement, delivery, layout, excavation,
planting, staking, fine grading, mulching, fertilization, interim
maintenance, watering, warranty.
Value:
Contact:
Phone No:
$2,700,000.00
Suitt Construction
Mr. Chris Sullivan /407-834-2300
'"
en
'"
t3
en
c
~
"-
~
'"
-""
ci:
'"
en
'"
'"
:J::
'"
~
.E
i!l
.~
'"
c
'"
ti
~
8
g
j
'"
ci::
WDWAMMALKmGDOMLODGE
Orlando, FL
Value:
Contact:
Phone No:
$3,420,000.00
Walt Disney World
Mr. Tim Warzecha / 407-566-1325
;:;
8
0-
Q
ci
:z
~
""
.
12
1.5.8 EVIDENCE OF CAPABILITIES
STATEMENT OF QUALIFICATIONS
~.....
I \. ~
\. ~~
\. ,
"'~
l:)
')
..
SCHEDULING CAPABILITIES
Our team employs Primavera P6 scheduling software to
determine and control time for all activities during the pre-
construction and construction phases of a project. The
schedules will be cost loaded, and will also include resource
loading and subcontractor crew sizes as needed. We also
have the capability to generate CPM diagrams in an easy-
to-read format.
P6 is capable of generating reports that are configured
specifically to the project priorities and which eliminates the
printing of irrelevant data. We will develop with the City of
Sunny Isles Beach a format appropriate for the needs of the
"Heritage Park and Parking Garage" Project
INITIAL SCHEDULE
Our Initial Proposed Schedule is prepared in network form,
which will graphically depict the interrelationship and duration
of all project activities. Specifically, the following are being
I shown:
Permitting Requirements
Approvals from State and Municipal Authorities
Project's Fast Track Phasing
Long Lead Materials and Equipment
. Major Construction Milestones
The schedule will be reviewed w,ith CSIB and our team and
will form the basis for monitoring project progress.
MASTER SCHEDULE UPDATES
Throughout the life of the project, the schedule will be used
to gauge the impact of scope changes and anticipated
problems, and to develop strategies for maintaining the
overall timeframe. The schedule will be updated bi-weekly
or more frequently if required, to show actual progress and
re-planning, if necessary. This enables the current status of
the project to be rapidly determined, if the updated schedules
indicate a slippage, problem areas are immediately identified
and when required subcontractors are brought together to
organize a solution.
The project management team will then meet the critical
trades in order to resolve any schedule slippages. Primavera
6 allows us to focus on a specific trade or area and generate
more detailed sub-schedules (sub-networks) to assist in
this task. As such the project's CPM becomes a working
management tool for the City of Sunny Isles and our team.
EXAMPLES
Coral Park Senior High was a project with significant
scheduling challenges, the project consisted of a phased
delivery dividing a new 170,000 square foot building from
a campus wide retrofit of upgraded fire alarm and public
address system, along with existing gymnasium and athletic
facility renovations and HVAC upgrades.
MCM again developed a design and permitting schedule,
and then went on to develop the construction schedule in
accordance with the phasing plan. Securing certification of
fire alarm and public address systems by phase, area, and
floor was critical for acquisition of certificates of occupancy
based on the clients needs. Each certification and its
predecessor activities had to be identified and monitored in
the schedule, along with typical major components of work.
By incorporating these detailed activity sequences into the
overall project schedule MCM was able to allow for a phased
occupancy and successfully deliver the project on time.
Westland Hialeah Senior High was another scheduling
challenge as noted in the previous examples, this project
required the planning, coordination and monitoring of 8
separate design submittals and permits, and the overall
project schedule had to be coordinated to allow for these ~
scheduling constraints. Construction of the 4 main buildings ~
had to be coordinated and relationships developed based ~ I
on forecasted permit approvals. In instances where permit ~ \
approvals were delayed, MCM revised the schedule logic ~ '
and re-sequenced construction activities to mitigate the ~
potential delays. ~
'"
.=
'"
'"
.~
V>
c
'"
'6
~
'"
'-'
g
1
~
w.~
- -
- -
1,W'PItIt O'IJ.N\'
._ ou.N'
....., ~,
.....,
.... -"'" ..xf9l'
a Jl.a..ut -
'" - ~
- -
- ~
~ -
~ -
>>-- .....
)(I l........ 21fU.
>> .- -
-
::;
~
g;
ci
z
~
""
..~
01_ aocx:'01
.
13
~
-
-=
1.5.8 EVIDENCE OF CAPABILITIES
Westland Hialeah Sr. High School
"~he project was delivered on time and within budget with the
hlg~est level of quality, all in an amicable and professional
e~v!ron"!ent. I highly recommend MCM for any project of
similar size and complexity without reservation. "
Dennis E. Caserta
Senior Project Manager
Office of School Facilities - Construction
Miami-Dade County Public Schools
Sunny Isles Beach Community K-B
"MCM Construction was always courteous to the staff and
respectful of our wishes. They worked tirelessly to ensure
that our concerns were addressed and that issues were
resolved in a timely fashion and with a favorable outcome.
We could not have asked for a more cooperative, dedicated
company. "
Dr. Annette Weissman
Principal
Sunny Isles Beach Community K-8
South Pointe Park
"Since commencement of construction activities MCM has .
de"!onstr~ted their. commitment to the City to c~mplete the
Project with ~he highest quality of service, and ahead of
schedule... Smce commencement of construction activities
MCM has demo~strat~d their. commitm~nt to the City t~
complete the Project with the highest qualtty of service as of
the date of this letter, and ahead of schedule. " '
Mario Gonzalez-Pola
Sr. Capital Improvements Coordinator
City of Miami Beach
Regarding the Sched.ule for Heritage Park & Parking Garage
we unders!and the City's need for a prompt delivery in May of
2010 or prior. As MCM develops this schedule we will focus
on t~e early delivery of the Garage in Phase 1 to allow CSIB
Publi~ Works Dept. to vacate their current staging area in the
footprint of the new Park. This early delivery milestone will
a!~o allow the. ~ity to benefit from the use of the garage by
Citizens and VIsitors while the Park is completed.
Overall ~he Project delivery schedule will provide the Garage
for use ~n February, provided we commence in July. As the
garage IS constructed the utilities in the right of way serving
the g~rage and park will be installed. Also MCM will begin
work. In the Park. concurrently with the garage wherever
~os~lble, perf~rmlng earthwork, installing drainage, site
lighting conduits, foundations and other improvements all
co~rdinated with ~he Public Works Dept. to assure there'are
no Impacts to their operations.
This approach will provide the City the early use of the
Garage and delivery of the Park prior to their May deadline.
~
STATEMENT OF QUALIFICATIONS
MATERIAL PROCUREMENT
MCM has learned that the best approach to material
pro.c~rement ~s to centralize it's purchasing rather than allow
indiVidual projects to Sub-contract the project. This allows a
team of trained procurement agents who have reviewed and
understand the project specifications to buy only materials
specified for the project.
T~is approach. also allows the procurementteam to repeatedly
price from a wide array of vendors, and establishes a network
of competitive pricing allowing us to secure the best rates for
specified materials and equipment on behalf of our Clients.
1.5.9 STATEMENT OF EXPERIENCE
EXPERIENCE WITH CM-AT-RISK METHOD
M.CM is very familiar with the Construction Management at
Risk methodology. The most recent projects delivered are:
· Sunny Isles Beach K-8 School $32 M
Target North Miami Beach $ 4.6 M
Target Davie $ 9.2 M
Target Dadeland $ 2.7 M
Wynwood Lofts $ 4.3 M
Blackstone Headquarters $ 12 M
These are only the most recent CM deliveries MCM has
learned from these projects and others that ma~y facets of
the CM approach comprise the "Best Value" to our Clients.
Over the last few years we have been able to save our Clients
millions of dollars in Construction and Maintenance costs
through our Value Engineering, Constructability Reviews
and Coordination efforts. '
The cost of the Sunny Isles Beach K-8 Community School '"
alone was reduced by over $1.5 million from the early stages ~
of design, without this effort the School Board would have ~
be~~ unable to proceed with the Project and provide the :E
facility to the community. !
A ~ey CM responsibili.ty MC~ emp.hasizes is analyzing i
project scope and design. DUring thiS period we look for ~
enhanced efficiencies during Construction giving the Project ~
~ear term cost benefit?, and reviewing constructablity and ~
life cycle costs analYSIS;. recommending different systems ]
an.d approaches to prOVide long term cost savings to the .!i!
Client through reduced maintenance requirements and ~
construction of reliable and efficient systems. ~
g
This approach, couple~ with MCM's focus on quality control, 1
schedules, and selection of only the best qualified sub- ";-
contractors for a project assure Project success through the :;i;
CM at risk delivery method. ~
ci
:z:
~
C><
.
14
CITY OF SUNNY ISLES BEACH ~
WHAT CAN WE BRING TO THE TABLE
MCM has performed an extensive analysis of the design
and looks forward to presenting and discussing a menu
of potential Value Engineering (VE) items for the City to
consider as part of the interview and selection process.
Once selected MCM can work with the City and Architect
in exploring the potential changes, and developing design
revisions for those VE items deemed appropriate in order to
quantify and capture the savings to the City.
Examples of items MCM would propose for Heritage Park
are changes to the building's "Exterior V system" to both
minimize cost and enhance longevity; another potential
savings may be a simplification of the "Fiberglass Grill" and
aluminum tubing system covering sections of the buildings
exterior. These are just two examples of the menu developed
by MCM, which we will provide the City if selected as part of
the shortlisted group of Contractors.
1.5.10 PRESENT & PROJECTED WORKLOAD
Work in Progress
Miami-Dade Fire Rescue Training Facility
GSA Trade Shop Facility
FDOT 1-95 Managed Lanes
Miami Beach Auditorium
Miami International Airport
756AD (North Terminal Improvements)
Bid Package #22
Bid Package #21
Bid Package #20
% Complete
3%
10%
35%
75%
15%
33%
9%
7%
Total Backlog March 2009: Approx. $125,000,000
As you will see in the next pages, thru our Surety and Bank
letters, MCM is a financially solid company with an aggregate
bonding capacity of over $400,000,000. At this moment
we are capable of picking up and staffing comfortably the
Sunny Isles Beach Heritage Park & Parking Garage. Gus
Fernandez is currently providing oversight on the Beach
Patrol/Auditorium for the City of Miami Beach along with
Paul Bessell who is managing the Projects day to day
operations.
The Project is scheduled to be delivered in June, allowing
both of these individuals to commence at Heritage Park upon
award. Both of these team members worked on the Sunny
Isles Beach K-8 Community School and are intimately aware
of the conditions for constructing in Sunny Isles Beach.
Brook Wolfe recently delivered South Pointe Park for the
City of Miami Beach and is available to start on Heritage
Park immediately.
Bill McCue will be made available for this Project given
his background with Parking Garages and familiarity with
STATEMENT OF QUALIFICATIONS
Sunny Isles Beach based on his recent delivery of the K-8
Community School.
Given the aforementioned availability of staff and limited
backlog MCM is prepared to mobilize to the site and
commence work for the City immediately.
We hope our proposal demonstrates that we are the most
qualified team to build the Heritage Park & Parking Garage
Project for the City of Sunny Isles Beach. We look forward
to give you the best service available, as we have done in
the past. If you have any questions, please do not hesitate
to cont t me.
L
Fer ndo Munifla, VP
30 .345.4444
fm mcmcorp.com
'"
en
E
..
'"
g>
~
"-
"'"
c
'"
-""
~
'"
en
.~
::t:
'"
~
~
'"
.~
V>
c
'"
t
~
.3
1
.l!!
o
C::
o
~
ci
:z
~
""
.
15
STATEMENT OF QUALIFICATIONS
RESUMES
EDUCATION
B.S. in Mechanical Engineering, Florida International
University, 1980
All State Construction College
Construction Management, 1979
University of Miami, Architecture, 1977
Louisiana Tech., Commercial Art, 1969
LICENSES
Florida Certified General Contractor, CGC018337
Montana Certified General Contractor, 1986
New Jersey Certified General Contractor, 1989
RESPONSIBILITIES
His primary function is to provide overa~1 ma~age~ent
direction and administration for the project, Including:
(1) initiate and maintain liaison with FlU in order to e~se
construction activities; (2) Monitor/control construction
through administrative direction of project manager and
superintendents; and (3) Establish project objectives,
policies, procedures and performance standards.
Additionally Fernando will be responsible for the overall
management of project, which includes management
and supervision of the production of all contract
administration documents including requests for
information; shop drawings log; change order requests,
coordination and correspondence to architects and
engineers, owners and subcontractors; schedule tracki~g
and identifying problems and potential problems with
plan specifications and subcontractors, among others.
EXPERIENCE
Responsible for over 250 projects ranging in a wide variety
of educational, commercial, institutional, industrial and
custom residential experience encompassing both new
structures and rehabilitation of historical facilities. The
gamut of experience includes masonry reinforced concrete,
steel superstructure and modular construction. Most of
the projects required estimating, bidding and negotiations
in addition to general coordination and supervision; cost
estimates; enforcement of quality control; client negotiations
and dealings with private or public sector agencies.
Fernando's relevant project experience in a supervisory
capacity includes the following:
Sunny Isles Beach Community K-8 Center, Sunny Isles,
FL - CM-at-Risk of a new Multi-story K-8 Facility designed to
house 1,642 student stations, on 2.1 acres One of the key
components of the project
was a multi-story parking
garage constructed on
pilings and grade beams in
a coastal environment. The
parking garage included
an elevator and occupied
areas at ground level, with
physical education and
custodial uses.
Westland Hialeah Sr.
High School, Hialeah,
FL - Design-Build of a new Senior High School complex
composed of multiple buildings, EHPA and courtyards to
house 1,839 student stations (322,084 SF). One of the key
components of the project was a multi-story, 150-space,
cast in place parking garage
Country Club Middle School, Miami Lakes, FL - Design-
Build of a new Middle school facility including 3 buildings.
A multi-story classroom building, Media Center, single story
Cafetorium/Kitchen building and Administration Building.
Norma B. Bossard ES, Miami, FL - This $18 MM Design-
Build project consists of the construction of a new 102,348
SF elementary school facility including 3 buildings.
Coral Park Senior High School, Miami, FL - This Design-
Build project consisted of 170,OqO SF state of t~~ art
facility including offices, food service, labs and traditional
classrooms.
'"
go
5
'"
Jackson Memorial Hospital Parking Garage, Miami :W
Beach, FL - Construction of a new Parking Garage, 5 stories ~
in height with the capacity to expand 2 more stories for a ~
total of 7. 'i
.~
:z:::
'"
~
'"
'"
.~
'"
c
'"
';:;
~
.9
~
.~
'0
D:
EMPLOYMENT
1993 to Present MCM LLC., Vice President
Miami, Florida
1988 to 1993 Kitchen & Associates Architects
Associate & Sr. Project Manager,
Westmont, New Jersey.
1986 to 1988 Alpha & Omega Construction Company,
President
Bozeman, Montana.
1979 to 1986 Brothers Construction Company,
President, Miami, Florida
~
:;i:
o
ci
z:
~
"'"
.
STATEMENT OF QUALIFICATIONS
RESUMES
Gus Fernandez
Construction Experience: 21 Years
CERTIFICA TIONS
State Certified Journeyman Carpenter
OSHA 30 Hour
LICENSES
Florida General Contractor's License, CGC062001
RESPONSIBILITIES
Gus has extensive experience in the pre-construction phase
of Construction Management Projects. He will be responsible
for analyzing and defining the extent of scope and facility
requirements in relation to the site and budget. Develop a
Master Schedule identifying major milestones for design and
construction, Develop Value Engineer solutions to optimize
project estimate and ensure constructability, among others.
During the construction phase, Gus will be responsible for
overseeing both assistant project managers.
EXPERIENCE
Gus has close to 20 years experience in construction, with
a heavy emphasis on commercial and educational facilities.
He is an expert scheduler and has extensive experience
working both at commercial and civil projects; this gives him
an edge with issues like phasing, planning for construction in
occupied sites and extensive knowledge of sub-contractors
and vendors.
GTI Central Collection
Plaza, Miami, FL
Construction of a new
centralized parking
collections plaza, and
administration building
totaling approximately
17,000sf, several acres
of site improvements, and
upgraded utilities, and new
roadways entering and
exiting Miami International
Airport.
US Coast Guard Rotary Wing Hangar - South Florida's
largest helicopter hangar, in the "busiest emergency air-
rescue facility in the world."
JMH Mental Health Facility - 190,000 SF, 3-story new
construction of a pre-cast concrete structure with cast-in-
place concrete frames.
EMPLOYMENT
1997 to Present M.C.M. LLC. Sr. Project Manager
1996 to 1997 Florida Development and Construction
Corporation, Vice President
1992 to 1996
Gus's relevant project experience in a supervisory capacity
includes the following:
Sunny Isles Beach Community K-8 Center, Sunny Isles,
FL - CM-at-Risk of a new Multi-story K-8 Facility designed
to house 1,642 student stations, on 2.1 acres One of the
key components of the project was a multi-story parking
garage constructed on pilings and grade beams in a coastal
environment. The parking garage included an elevator and
occupied areas at ground level, with physical education and
custodial uses.
Westland Hialeah Sr. High School, Hialeah, FL - Design-
Build of a new Senior High School complex composed of
multiple buildings, EHPA and courtyards to house 1,839
student stations (322,084 SF). One of the key components
of the project was a multi-story, 150-space, cast in place
parking garage
Country Club Middle School, Miami Lakes, FL - Design-
Build of a new Middle school facility including 3 buildings.
A multi-story classroom building, Media Center, single story
Cafetorium/Kitchen building and Administration Building.
Carney Construction Corporation
Project Manager
Harrison Construction Corporation
Lead Carpenter
1988 to 1992
'"
en
"
o
'"
g>
:;;
~
~
c
'"
-><
~
'"
en
.~
:>::
'"
..<:
.!:
'"
]
c
'"
B
~
..9
g
.~
~
e
"-
c;
,."
~
=
ci
z
s:
""
.
STATEMENT OF QUALIFICATIONS
RESUMES
Construction Experience: 7 Years
EDUCATION
B.S., Construction Management, Florida International
University (In Progress)
CERTIFICA TIONS
OSHA 30 Hours
CPR & First Aid Training
Fall Safety Training
Trench Excavation Safety
Boom Lift
Scissor Lift
RESPONSIBILITIES
Paul will be responsible for the overall management of all
construction activities related to the parking garage, includ-
ing but not limited to: Cost & Risk Management, Schedule
update, Sub-contractor & Vendor Billing, adequate reporting
to Owner and MCM Management, Produce requisition and
schedules of values for updates to job cost reports, coordi-
nation of Team Meetings to maintain clear lines of commu-
nications.
EXPERIENCE
Paul has over 7 years experience working with clients such
as Miami International Airport, Miami-Dade County Public
Schools and more recently the City of Miami Beach. He has
experience building both parking garages and park & sports
facilities, so he is perfectly suited to assist in the supervision
of this project.
,
Coral Park Senior High
chool, FL - Design-Build
f a 170,000 square foot
state of the art facility which
ncludes administrative
offices, food service for the
entire campus, technical
labs, performing arts labs,
and traditional classrooms.
his project included the
construction of a 60-space
parking garage.
~
Key Biscayne K-S, Key Biscayne, FL -
GTI Central Collection Plaza, Miami, FL - The design-build
of a K-8 Middle School consisting of 3 story building, 80,000
sf. The majority of the ground floor was a 45-space parking
garage. The remaining areas will consist of educational
spaces along with a Dining Facility.
Other Projects
MIA South Terminal Program
AA North Terminal Development
Concourse H-J Utility and Pavement
$350,000,000
$25,000,000
$5,000,000
EMPLOYMENT
2005 to present MCM, Assistant Project Manager
2004 to 2005 Parsons Odebrecht JV,
Project Engineer
2002 to 2003
Underground Construction CO. Inc,
Assistant Project Manager
BCL Construction,
Assistant Project Manager
'"
en
'"
'"
'"
g>
:g
"-
~
c
'"
-'"
.E
'"
en
'"
'"
:J::
'"
~
.a
'"
.~
V>
c
'"
";:;
.E
::
'"
.....
1
.)!!
'"
0::
2003 to 2004
Paul's relevant project experience in a supervisory capacity
includes the following:
Miami Beach Patrol &Auditorium Building, Miami Beach,
FL - This project consist of partial restoration, renovation
and addition to existing (2) story AuditoriumlBeach Patrol
Headquarters facility, improvements to accessibility, life
safety and partial site improvements included.
Westland Hialeah Sr. High School, Hialeah, FL - Design-
Build of a new 4-story Senior High School complex composed
of multiple buildings, Courtyards to house 1,839 student
stations (322,084 SF). One of the key components of the
project was a multi-story, 150-space, cast in place parking
garage
Country Club Middle School, Miami Lakes, FL - Design-
Build of a new Middle school facility including 3 buildings.
A multi-story classroom building, Media Center, single story
Cafetorium/Kitchen building and Administration Building.
o
8
0-
o
ci
:z:
f2
""
.
STATEMENT OF QUALIFICATIONS
RESUMES
Construction Experience: 7 Years
EDUCATION
Bachelors in Marine Science Biology,
University of Miami, 2001
CERTIFICATIONS
OSHA 10 Hour
OSHA 30 Hour
Nuclear Gauge
Flagger Training
Hazmat Training
Advanced MOT
CTQP Asphalt Paving Level 1
SWPP Training
RESPONSIBILITIES
Brook will be responsible for the overall management of all
construction activities related to the park, including but not .
limited to: Cost & Risk Management, Schedule update, Sub-
contractor & Vendor Billing, adequate reporting to Owner and .
MCM Management, Produce requisition and schedules of
values for updates to job cost reports, coordination of Team .
Meetings to maintain clear lines of communications. Addi-
tionally, Brook is a LEED accredited professional, which will .
ensure the construction of the greenest building possible.
MDX SR 836 Toll Plaza
Extension, Doral, FL -
This $59 million project
included the widening and
Reconstruction of the SR 836
Expressway approximately
1.1 miles in length, from 1900
feet east of NW 107th Ave
to 2500 west of 87th Ave.
The project also includes
the construction of new
eastbound and westbound
mainline toll plazas.
Other Projects
FDOT District 6, N.W. 79th Street PD&E Study, Miami-
Dade County, FL
FDOT District 6, Krome Avenue North PD&E Study,
Miami-Dade County, FL
FDOT District 6, 1-395 Advance Acquisition PD&E Study,
Miami-Dade County, FL
FDOT District 6, NW 8th Street/Port of Miami Ramps
PD&E Study, Miami-Dade County, FL
FDOT District 6, NW 14th Street PD&E Study, Miami-
Dade County, FL
FDOT District 6, Plantation Key PD&E Study, Monroe
County, FL
FDOT District 4, Pines Boulevard & Flamingo Road
Interchange PD&E Study, Broward County, FL
FDOT District 4, Hollywood Boulevard & 62 Avenue g,
Interchange PD&E Study, Broward County, FL ..3
g>
:g
"-
"'"
c
'"
.><
cf
'"
en
.~
:J::
'"
~
'"
'"
>
'"
V>
c
'"
1
.3
]
e
"-
EXPERIENCE
Brook has over 6 years Civil construction experience. She ·
just completed the construction of South Pointe Park, a $22
million overhaul that resulted in a state of the art park for the ·
City of Miami Beach. Her involvement in this project and her
expertise with environmental issues gives her an edge to
oversee the construction of Heritage Park. EMPLOYMENT
2005 to Present MCM, Asst. Project Manager
Brook's relevant project experience in a supervisory capacity
includes the following:
1-95 Managed Lanes, Miami, FL - This $121 million Project
includes the design and construction of the Managed Lanes
on 1-95 Northbound and Southbound from approximately
South of the NW 32nd Street bridge to North of the SR 826
(Golden Glades) interchange, and including the SR 112
Interchange
South Pointe Park, Miami Beach, FL - This $22 million
project consists of the renovation of a 19 acre Park, including
extensive site work, underground utilities, the construction
of new walk along the coastline, parking lot renovation
and addition, construction of a new Pavilion, Playground
and other Accessory Buildings. Construction of a 13' High
Serpentine Land Form. Water features,
2002 to 2005
Consulting Engineering & Science, Inc.
2001 to 2002
Miami Museum of Science.
IMPACT Mentor
~
'9
a-
o
ci
:z
~
""
.
CITY OF SUNNY ISLES BEACH ~
SUPERINTENDENT
Bill McCue
Construction Experience: 34 Years
EDUCATION
Bachelors in Marine Science Biology,
University of Miami, 2001
CERTIFICA TIONS
OSHA 30
MOT Training
Flagger Training
Trench Excavation Safety
Fall Protection
RESPONSIBILITIES
Bill will be responsible for the overall supervision and control
of all construction project activities; evaluating and maintain-
ing project progress for profitability and timeliness; coordi-
nating concerns of customers, architects, and subcontrac-
tors; ~ey mat.erial and equipment pro~urement; ensuring
compliance with safety standards, and Implementing com-
pany policies and procedures. Assists and reports to the
Project Manager in managing, monitoring and supervising
field activities.
EXPERIENCE
Bill has over 33 years experience in construction, with a
heavy emphasis on commercial and educational facilities in
South Florida. He has extensive experience working at com-
mercial, multi-story facilities such as the Heritage Parking
Garage, as well as acres of development of spots fields and
playgrounds for Miami-Dade County Public Schools giving
him an edge with issues that this project can present dur-
ing const~uction. Bill was the superintendent in charge of the
construct/on of the Jackson Memorial Hospital North Parking
Garage, a 5 story pre-cast facility very similar to the Heritage
Parking Garage.
STATEMENT OF QUALIFICATIONS
RESUMES
Wynwood Lofts, Miami,
L - this $5 million project
onsisted of a 36-unit from
40 sq. ft to 1463 sq. ft, project
f lofts reminiscent of an old
actory building south of the
esign district. This project is
oned to live and work in the
ame space.
Miami International
irport, North Terminal
~ Development - This $56.7
lIion project consisted of
the foundations, shells and finishes for the new extension
for the American Airlines Concourse C & D, adding a dozen
new gates with over 600,000 square feet of new construction
in a 6-story, 1,1 OO-foot, westerly extension of the existing
Concourse D. .
MDTA Palmetto Train Station, Hialeah, FL - A $7.9 million
award ~in~ing Metrorail Station at the end of the Transit way
Extension Just west of Palmetto Expwy, the 22nd station in
the Metrorail system.
Jackson Memorial Hospital Parking Garage, Miami, FL -
this $~ 8 ~illi00 proj~ct consiste~ of a new Parking Garage,
5 stories In height with the capacity to expand 2 more stories
for a total of 7. This creative engineering allowing for future
growth required over 700 piles and more than 60 pile caps.
Jackson Memorial Hospital Mental Health Facility, [
Miami, FL - this $ 22 million consisted of a 190,000 SF, 3 g,
story mental health facility, consisting of pre-cast concrete :g
structure with cast-in-place concrete frames. ]
-'<
cE
'"
en
.~
:I:
'"
~
'"
'"
>
'"
V'>
c
'"
'6
~
.3
1i
.~
"0
0;:
Bill's relevant project experience in a supervisory capacity EMPLOYMENT
includes the following: 1993 to Present MCM, Superintendent
Sunny Isles Beach Community K-8 Center, Sunny Isles,
FL - CM-at-Risk of a new Multi-story K-8 Facility designed
to house 1,642 student stations, on 2.1 acres One of the
key components of the project was a multi-story parking
garage constructed on pilings and grade beams in a coastal
environment. The parking garage included an elevator and
occupied areas at ground level, with physical education and
custodial uses.
Pine Hollow Construction, Inc.,
Project Superintendent, Englewood, FL
Vantage Homes,
Project Superintendent, Sarasota, FL
United Development,
Project Superintendent, Sarasota, FL
c;
~
=
ci
z:
~
0<:
Norma B. Bossard ES, Miami, FL - This $18 MM Design- MSP Construction, Project Superintendent, Sarasota, FL
Build project consists of the construction of a new 102,348
SF elementary school facility including 3 buildings. State Contractors, Inc.,
Independent Sub-Contractor, Sarasota, FL
.
STATEMENT OF QUALIFICATIONS
RESUMES
EDUCATION
Bachelor of Science in Construction Management, Florida
International University, 2001.
CERTIFICATIONS
OSHA 500 Certification
OSHA 30 Hour and 10 Hour Trainer.
Department of Environmental Protection
Storm Water/ Erosion
Control Certified Inspector.
Intermediate Maintenance of Traffic Supervisor.
FDOT Flagger Trainer.
Scaffold, Excavation, Confined Space and Fall
Protection Competent Person Trainer.
Forklift, Boom Lift, Scissor Lift, Hilti Impact Tools Safety
Trained.
CPR/First Aid Certified/Trained.
Rigging and Hoisting Safety Trained/Competent
Person.
RESPONSIBILITIES
Eddie will be responsible for orienting employees on the
safety and health rules, procedures and requirements es-
tablished for the work task(s) to be performed. Maintain all
safety records. Maintain an overall traffic control plan for
pedestrians, vehicular traffic and construction operations.
Complete investigation and follow up reports of all injuries.
RELEVANT PROJECT EXPERIENCE
State School BB1, Sunny Isles, FL - CM-at-Risk of a new
Multi-story K-8 Facility designed to house 1,642 student
stations, on 2.1 acres.
Coral Park Senior High
School, Miami, FL - This
Design-Build project consisted
of 170,000 SF state of the art
facility including offices, food
service, labs and traditional
classrooms.
Miami International Airport,
North Terminal Development
- This $56.7 mllion project
consisted of the foundations,
shells and finishes for the new
extension for the American Airlines Concourse C & D, adding
a dozen new gates with over 600,000 square feet of new
construction in a 6-story, 1,1 OO-foot, westerly extension of
the existing Concourse D.
Le Jeune Rd Flyover - Roadwork/Bridge. 2003- 2005.
Safety Manager.Reconstruction of Lejeune Road, between
NW 36th Street and Okeechobee Road. Replacement
of the existing Lejeune Road Bridge at the Miami Canal
with two new bridges. Additionally, a new flyover bridge
connecting Lejeune Road northbound with Okeechobee
Road westbound is part of the construction.
EMPLOYMENT
2002 to Present. MCM, Safety Director.
1999 to 2002 International Builders Latin America. .
Project Manager.
1998 to 1999 The Corradino Group
Contract Administrator.
'"
en
'"
C
'"
en
c
:g
"-
~
c
'"
-""
~
'"
en
'"
'"
:t:
'"
-'=
'"
'"
>
'"
V'>
c
'"
t;
~
.3
~
~
E!
"-
Westland Hialeah Sr. High School, Hialeah, FL - Design- 1997 to 1998
Build of a new Senior High School complex composed of
multiple buildings, EHPA and courtyards to house 1,839
student stations
Country Club Middle School, Miami Lakes, FL - Design-
Build of a new 147,716 SF Middle school facility including 3
buildings.
Jorge Mas Canosa Middle School, Miami, FL - Design-
Build of a new Middle school facility including 3 buildings.
A multi-story classroom building, Media Center, single story
Cafetorium/Kitchen building and Administration Building.
Norma B. Bossard ES, Miami, FL - This $18 MM Design-
Build project consists of the construction of a new 102,348
SF elementary school facility including 3 buildings.
JCllnternational,
Asst. Project Manager
5
~
""
.;
:z:
~
""
.
CITY OF SUNNY ISLES BEACH ~
SAFETY MANAGER
Eddie Martinez
Construction Experience: 34 Years
EDUCATION
BS Civil Engineering, University of Havana, Cuba
CERTIFICA TIONS
Current USACE Construction Quality Management
(CQM) for contractors Certificate
CTQP Asphalt Paving Technician Level 1 & 2
CTQP Earthwork Construction Inspector Level 1 & 2
CTQP QC Manager
Nuclear Gauge Safety Certification
OSHA 30
STATEMENT OF QUALIFICATIONS
RESUMES
RESPONSIBILITIES
Carlos is responsible for monitoring the various components of ITS Operations Facility, Ft. Lauderdale, FL - The project is
construction so that a continuing system of quality assurance divided into four phases (1) partial demolition of the existing
prevails. He also maintains the Quality Control program occupied building, (2) construction of a new 2-story 42,400
so that construction is in accordance with the contractual SF building, (3) complete demolition of the existing building,
requirements, plans, specifications, applicable codes, and (4) sitework.
accepted industry standards, and within a predetermined
cost and time framework.
EXPERIENCE
Mr. Hernandez has worked for MCM for over 8 years as our
Quality Control Representative, he brings a wealth of Civil
and Commercial experience to this project. Carlos's relevant
project experience includes the following:
Miami International Airport 756AD - This $125 Million
projects consists of General construction of renovations in
the existing terminal building located in terminal areas A
through D on levels 1, 2 and 3.
MDX SR 836 Extension & Toll Plaza, Miami, FL - Widening
and Reconstruction of the SR 836 Expressway approximately
1.1 miles in length, from 1900 feet east of NW 107th Ave
to 2500 west of 87th Ave. The project also includes the
construction of new eastbound and westbound mainline toll
plazas.
Hialeah Expressway, Miami, Florida - Widening and
Reconstruction of SR 934 consisting of the following: Addition
of 1 lane each way, widening the road from four to six lanes.
Widening of bridges over the FEC Railroad at NW 69th Ave
and W. 5th Way. Upgrade of drainage, lighting and signals.
Building noise walls near residential areas.
GTI Central Collection Plaza, Miami, Florida - The GTI
Central Collections Plaza consists of a new centralized
parking collections plaza for MIA, and administration building
totaling approximately 17,000 sf.
EMPLOYMENT
1998 to Present MCM Corp, QAlQC Manager
1995 to 1998 Envirotech Contractors, Inc.
Superintendent
1990 to 1995 Cuba Construction Ministry
Principal Engineer
1987 to 1990 Jose Marti Iron & Steel Plan
Consultant Engineer
'"
en
'"
C
'"
~
~
"-
~
c
'"
-"<
~
'"
en
c
'"
::t:
'"
~
'"
'"
.5
'"
c
'"
ti
~
.3
]
d:
::;
~
<=>
ci
:z:
~
<><
.
-
STATEMENT OF QUALIFICATIONS
RESUMES
Parking Facility Experience: 40 Years
EDUCATION
University of Michigan,
Bachelor of Science in Engineering, 1959
P.E. REGISTRATIONS
Washington, Florida, Pennsylvania, Michigan, Ohio
PROFESSIONAL AFFILlA TIONS
Florida Parking Association
RESPONSIBILITIES
Mr. Ebert will be responsible for assessing the architectural
and structural scope, as well as the ingress and egress
patterns of the project to provide Value Engineering options
and constructability review during the pre-construction
phase.
EXPERIENCE
Mr. Ebert is the Executive VP for Tim Haahs and is one of
the nation's leading parking consultants with over 40 years
of experience, participating on over 500 parking structure
projects. He has a thorough understanding of all aspects
of parking structure planning, design, and construction. Mr.
Ebert specializes in developing functional design layouts for
complex and mixed-use parking facilities.
He has managed successful projects for the Miami Parking
Authority, the Union Station Redevelopment Corporation
(Washington, DC), and a variety of other corporate,
governmental, transit, and healthcare clients. He participated
as a peer reviewer and quality control specialist on over 200
parking structure projects.
Bill's relevant project experience in a supervisory capacity
includes the following:
Miami Courthouse Garage, Miami, FL - This 850 space,
mixed-use facility, adjacent to the new Federal Courthouse
in downtown Miami, will house two retail spaces on the
ground floor, and more than 30,000 square feet of office
space, including the Miami Parking Authority's administrative
offices.
City of Naples Public Parking Facility, Naples, FL - This
four tier, 341 space facility provided much needed parking
to employees and customers of the exclusive Fifth Avenue
South shopping area, in addition to supporting the Naples
Players Theater located directly adjacent to the facility.
MBNA Southern Regional Headquarters Phase II Parking
Garage, Boca Raton, FL - The 499 space employee garage
blends into the campus, and features an attractive fagade.
Union Station Parking Expansion, Washington, DC
- TimHaahs designed the expansion, renovation, and
beautification of the parking garage serving historic Union
Station. The expansion added 1000 spaces on five levels
of cast-in-place, post-tensioned concrete, increasing the
garage capacity to 2,500 spaces.
Kent County Courthouse Parking Garage, Warwick,
RI - This attractive 531 space garage serves the adjacent
courthouse complex. Security was a critical consideration
in the design, and a separate judges' entrance provides
access to 27 designated spaces requiring special security
considerations.
Norristown Transportation Center, Norristown, PA,
TimHaahs designed the new intermodal facility, which
includes a 522 space garage and bus terminal. The new
facility will allow for the expansion of SEPTA bus and rail
transit to the area.
'"
[
'"
en
c
:;<
.f
~
c
'"
-'"
.f
'"
en
'"
'"
::t:
'"
-=
'"
i!l
.~
V>
c
'"
'6
~
'"
......
~
'"
.~
..!E
E!
"-
~
:;:
=
o
:z:
~
""
.
STATEMENT OF QUALIFICATIONS
RESUMES
CITY OF SUNNY ISLES BEACH ~
STRUCTURAL CONCRETE SPECIALIST
Eduardo Rodriguez
Firm: Florida Lemark
Structures Construction Experience: 34 Years
EDUCATION
University of Michigan,
Bachelor of Science in Engineering, 1959
p.E. REGISTRATIONS
Washington, Florida, Pennsylvania, Michigan, Ohio
PROFESSIONAL AFFILIATIONS
Florida Parking Association
TRAINING
. Precast Certified Institute
I.C.R.1. - International Concrete Repair Institute
. Sika Corporation
. Euclid Corporation
. A.W.S. - American Welding Society
RESPONSIBILITIES
Eddie Rodriguez will be responsible for' assessing the
structural scope of the project to provide Value Engineering
options and constructability review during the pre-construction
phase.
EXPERIENCE
Involved in the precast industry in the Quality Control
Department at Maule Industries followed by promotions
to Production Supervisor and finally Field Operations
Superintendent. After 14 years of employment in a precast
manufacturing facility joined Construct Erectors, Inc. to
develop a Restoration Division and supervise erection
projects.
In 1987, founded Florida Lemark Corp., the business
originally was started as a restoration contractor. Through
the years expanding our services to General Contracting,
specializing in precast parking structures.
EMPLOYMENT
1987 to Present Florida Lemark Corp. - Vice President
1988 to 1989 Construct Erectors, Inc. - Superintendent
1975 to 1988 Maule Industries - QC Inspector
'"
en
c
'"
'"
g>
:s<
.f
~
c
'"
-'"
.f
'"
en
'"
.~
:I:
'"
-=
'"
'"
>
'"
""
c
'"
1
'"
.....
~
o
~
0::
5
~
C>
.;
:z:
~
""
.
CITY OF SUNNY ISLES BEACH ~
LANDSCAPE PROFESSIONAL / PARK DEVELOPMENT SPECIALIST
Kathy O'leary Richards, RLA, ASLA
Firm: O'Leary Richards Design Associates, Inc.
Landscaping Design Experience: 22 Years
EDUCATION
BLA University of Florida, 1985
College of Architecture and Fine Arts
Department of Landscape Architecture
p.E. REGISTRATIONS
Landscape Architect (Florida) #0001317
PROFESSIONAL AFFILlA TIONS
American Society of Landscape Architects
RESPONSIBILITIES
Mrs. O'Leary will be respon~ibleforasses.sing the landscaping
and park .development design of the project to provide Value
Englneenng options and constructability review during the .
pre-construction phase.
SELECT EXPERIENCE
Municipal:
Evelyn Greer Park, Pinecrest, FL
F~unders Park, Aventura, FL
. Village Green Park, Key Biscayne, FL
Hadley Park Senior Center, Miami FL
. Sunrise Park, Coral Gables, FL '
Waterways Park, Aventura, FL
Oceanfront Park, Sunny Isles Beach, FL
Town Center Park, Sunny Isles Beach, FL
. Chuck Pezoldt Park, Miami, FL
Miami Beachfront Park & Promenade, Miami
Beach, FL
. City of Miami Fire Sta. No. 11, Miami, FL
Streetscapes:
Miracle Mile, City of Coral Gables, FL
Aventura Boulevard Streetscape Aventura FL
· Williams Island Boulevard, Aventura, FL '
. N.E. 190th St., 207th St., 191st St., 185th St., 213th
S~., 188th St. Landscape, Aventura, FL
Blscayne 4, 5, 6 & 7 Landscapes Aventura FL
Collins Avenue Streetscape, Bal Harbour, FL
Crandon Blvd. Streetscape, Key Biscayne, FL
· US-1/SW 136th St. to SW 80th St., Pinecrest, FL
Country Club Drive Landscape Aventura FL
· Collins Ave. Streetscape, Sunny Isles Be~ch, FL
Country Walk Street Tree Master Plan, Miami, FL
Doral Street Tree Master Plan, City of Dora!, FL
Palmetto Bay St. Tree Master Plan, Palmetto Bay, FL
STATEMENT OF QUALIFICATIONS
RESUMES
Hurricane Landscape Restoration, Aventura, FL
FDOT Roadway Landscapes:
. US-1/Cardsound Road to SW 304th St Homestead FL
US-1 Exclusive Bus Lanes, Dade Cou~ty, FL '
US-1 from S.w. 37th Avenue to 1-95, Miami, FL
· S:R. 826 Landscape Improvements, Miami, FL
Big Cypress Nat'1 Park Rest Area, Collier County FL
· S.R. 811 .Landscape, Wilton Manors, FL '
S.R. 5, Blscayne Blvd. from N.E. 87th Street to
N.E. 121 st Street, Miami, FL
. S.R. 845, Powerline Road, Broward Co., FL
S.R. 860, Miami Gardens Drive, Miami, FL
. SR 862/Eller Dr. Exp. Connector, Ft. Lauderdale FL
FDOT District 4 Landscape Plan Review '
Miami-Dade County Schools:
. Design Build Miami Lakes High School
Design Build Elementary Schools H-1 F & U
Des!gn Bu!ld Dr. .Michael Krop Senior 'High School
Design Build Felix Varela Senior High School
. Design Build Miami Senior High School
Miami Lakes Technical School
. A.L. Lewis Elementary, Springview Elementary
Lakeview Elementary, Rockway Elementary
. Ernest Graham Elementary, Centennial Middle
John Ferguson Sr. High, Coral Reef Elementary
. Kensington Elementary, Pinecrest Elementary
S~~th Miami Elementary, Scott Lake Elementary
· HI~ISCUS Elementary, Howard Drive Elementary
Winston Park Elementary, Devon Aire Elementary
. Aspira North Charter School
'"
~
'"
en
c
3<
,f
~
c
'"
"'"
,f
'"
en
.~
:I::
'"
-'"
'"
'"
>
'"
'"
c
'"
'6
~
'"
.....
l
'"
Q:
Commercia/Residential:
Smathers Four Fillies Farm, Village of Pinecrest FL
Mercedes-Benz of Cutler Bay, Cutler Bay, FL '
Monte Carlo, Miami Beach, FL
Sunshine Gasoline Corp. Offices, Doral FL
Am~rican Prime, N. Bay Village, FL '
Manna Cove Apartments, Aventura, FL
. Sunset Place, South Miami, FL
5660 Collins Ave. Condominium, Miami Beach, FL
South Beach Hotel, Miami Beach, FL
Houston's Restaurant, N. Miami Beach FL
Majestic Tower, Bal Harbour, FL '
Gables Waterway Tower, Coral Gables, FL
~
~
Q
ci
Z
~
""
.
STATEMENT OF QUALIFICATIONS
RESUMES
Adrian Rivero
Firm: Vila & Sons
RESPONSIBILITIES EDUCATION:
Mr. Caballero will be responsible for the coordination of labor, High School Diploma Havana, Cuba
materials and equipment for the irrigation scope. Construction Management Studies Havana, Cuba
Vila and Son Landscaping Corp. 1997 - Present
Vice President, Irrigation Division Irrigation. Oversees all
day to day operations including but not limited to managing
all irrigation field personal, job scheduling, coordination with
general contractors, sub-contractors, landscape architects,
suppliers, underground utilities (locations personnel). Job
costing and job estimating. Fulfilling permit requirements,
testing and inspections. Employee evaluation. Maxicom
Certified. Qualifier for:
1. Dade County
2. Palm Beach County
3. Indian River County
4. Lee County
5. Monroe County
6.0sceola County
7. Broward County
8. Martin County
9. Orange County
10. Collier County
11. Polk County
Senior Field Supervisor
February 1993- February 1997
South Coast Irrigation Inc.
Overseeing of all irrigation field employees and
operations
Scheduling of all irrigation projects
Supervising of all vehicles and equipment including
service and repairs and overseeing mechanics
Irrigation Installation & Service Foreman
Best Sprinkler Systems
Auqust 1992 - February 1993
Installation of commercial & residential systems
Service technician and repair troubleshooter
Irrigation supply house sales counter
Dade Broward Supply
March 1988 - February 1993
Sales of irrigation products
· Working with irrigation contractors
RESPONSIBILITIES
Mr. Caballero will be responsible for the coordination of labor,
materials and equipment for the irrigation scope.
EXPERIENCE
Vila & Son Landscaping Corp., Miami, FI
January 2000 - Present
General Superintendent
Responsible for the coordination and scheduling of branch's
field personnel and equipment. Oversee production and
quality control. Major projects completed:
. Village of Merrick Park, Coral Gables
City of Aventura, Biscayne Blvd. Beautification
Cleveland Clinic, Weston
Murano Portifino, Miami Beach
Murano Grand, Miami Beach
Sunny Isles Beach, AI A Beautification
Project Superintendent:
Responsible for on site coordination and supervision of major
projects. Supervise crews, maintain schedules, and oversee
quality control.
Foreman:
Responsible for 7 men crew. Perform layout, equipment
operation, and oversee proper installation practices.
Vareka Investment, Miami, FI June 1994 - January 2000
'"
en
'"
"
'"
g>
~
"-
~
c
Maintenance Engineer ~
Responsible for the building and grounds maintenance of a ~
62-tenant facility. ~
Supreme International, Miami, FI December 1993 - June .f
1994 ~
:!l
.~
'"
c
warehouse 1
.3
Shipping Clerk
Responsible for preparing and shipping all
orders
~
~
c::
~
~
=
.;
:z
~
""
.
1M
... .~
~...... . ..
CITY OF SUNNY ISLES BEACH ~
GEOTECHNICAL EXPLORATION / UTILITY LOCATE / ENVIRONMENTAL CONSIDERATIONS
Thomas Tepper
Firm: Dunkelberger Engineering & Testing
Landscaping Design Experience: 30 Years
EDUCATION
B.S. in Civil Engineering,
Carnegie Institute of Technology, 1963
M.S. in Civil Engineering,
Michigan State University, 1964
P.E. REGISTRATIONS
Professional Engineer - Florida (No. 27451)
Professional Engineer - Hawaii (No. 2433)
PROFESSIONAL AFFILIATIONS
National Society of Professional Engineers (NSPE)
Florida Engineering Society (FES), Past President
American Society of Civil Engineers (ASCE)
RESPONSIBILITIES
Mrs. Tepper will be responsible for assessing any specific
soil & environmental conditions, as well as the utility location
and planning during pre-construction.
EXPERIENCE
Mr. Tepper is a civil engineering practitioner with over 40 years
of experience in the planning, execution and management
of geotechnical engineering studies for a variety of facilities
including roadways, bridges, dams, impoundments,
embankments, shoreline structures and buildings. Following
short-term employment with the California Department
of Water Resources in the dam design section and a
Sacramento, California based geotechnical firm, he joined
Dames & Moore in 1967 as a staff engineer.
Overthe next 22 years heworked forthatfirm as a geotechnical
engineer both domestically and internationally while taking
on assignments of greater and greater complexity as he was
gradually promoted and ultimately admitted as a partner
to the firm. Mr. Tepper joined Dunkelberger Engineering
& Testing, Inc. (Dunkelberger) in 1995 after five years of
employment with Jammal & Associates, Inc. (later PSI).
The following provide a synopsis of projects for which he
has served as either principal-in-charge andlor the principal
investigator:
· Center for Collaborative Research Parking Garage,
Nova Southeastern University (NSU), Davie, Florida
Four-story Parking Garage, North Broward Medical
Center, Broward County, Florida
STATEMENT OF QUALIFICATIONS
RESUMES
New Vehicular Parking Garage, Seminole Hard Rock
Hotel and Casino, Hollywood, Florida
. Parking Garage I, Florida Atlantic University (FAU), Boca
Raton, Florida
Parking Garage II, FAU, Boca Raton, Florida
. The Water Garden Parking Garage, Fort Lauderdale,
Florida
. Three-level Parking Structure, Lexus of Pembroke
Pines, Pembroke Pines, Florida
· Vehicular Parking Garage, Biscayne Landing, North
Miami, Florida
. Atlantic Tower Parking Garage, Pompano Beach,
Florida
'"
en
'"
'"
'"
en
c
~
"-
.."
C
'"
-'"
~
'"
en
'"
'"
:I::
'"
J:
'"
i!l
.~
'"
c
'"
'6
~
'"
.....
~
~
.;:
o
~
g;
d
z:
1'2
""
.
AUTHORIZATION TO CONDUCT BUSINESS
IN THE STATE OF FLORIDA
MCM
State of Florida
Department of State
I certify from the records of this office that MUNILLA
CONSTRUCTION MANAGEMENT, LLC is a limited liability
company organized under the laws of the State of Florida, filed on May
15,2008.
The document number of this limited liability company is
L08000050123.
I further certify that said limited liability company has paid all fees due
this ollice through December 31. 2009. that its most recent annual report
was filed on March 20. 2009, and its status is active.
I further certify that said limited liability company has not filed Articles
of Dissolution.
Gil'ell IInder my IIand (llld the Great Seal of
f10rida. at Tallahauu.ll" Capital. tlliJ tire
'-'~
Secretary of State
Autheuticaliolll ID: 6OOU6-&'2"U-O"2109~L080000~11J
To allthcnti.:atc this cCf1ifi.."lc,\"j,jt the followin, .it.. cot... dU,
ro, ud then follow the imttmhom dnptaycd.
bttps:llenIe.sunblz.or&fcertautbvl'r.html
LICENSE NBR
'"
~
'"
en
c
~
"-
-g
'"
-'"
.E
'"
en
'"
'"
:J:
'"
.<=
oS
'"
.~
V>
c
'"
.e
~
.3
1
~
.:t
ACt! L 11 -: G 7 4
STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
CONSTRUCTION INDUSTRY LICENSING BOARD
SEQ# L08102701401
10 27 2008 080144420 CGClS13804
The GENERAL CONTRACTOR
Named below IS CERTIFIED
Under the provisions of Chapter 48.9 FS.
Expiration date: AUG 31, 2010
MUNILLA, JORGE
MCM
6201 SW 70TH STREET
MIAMI FL 33143
CHARLIE CRIST
GOVERNOR
CHARLES W. DRAGO
SECRETARY
;;
8
g;
.;
:z:
~
""
DISPLAY AS REQUIRED BY LAW
.
CITY OF SUNNY ISLES BEACH ~
TIM HAAHS ARCHITECTS & ENGINEERS
AUTHORIZATION TO CONDUCT BUSINESS
IN THE STATE OF FLORIDA
Certificate of Status
I certify from the records of this office that TIMOTHY HAAHS & ASSOCIATES, INC. is
a PemlSylvania cOlporation authorized to trallSact bllSiness in the State of Florida. qualified
ou April 14. 1997.
The doclUnent number of tillS cOlporation is F9700oo0 191 O.
I lil11her cet1ify that said corporation has paid all fees dl1e tillS office tluol1gh December 31.
2009, tlllIt its mosl recent anl1ual report!lmifonn business report was filed on January 07,
2009. and its status is active.
I limher certifY that said corporationlllls not filed a Cel1ificate of Withdrawal.
I further certify that tillS is an e1ectrOlllcally transmitted certificate authorized by section
15.16. Florida StaMes. alld authenticated by tllis code. 090107234849-000139934800#1.
Givenlmder my hand and the
Great Seal of the State of Florida
at Tallahassee. the Capital. tillS the
Seventh day of January. 2009
l~
~crrrtilr!, of ~tiltc
~'\~t~ ~
.~~:mG1ar~ :&tr
. . <i,i 'i ~::.~~. "~l':'.~~i ,,~~;o: '.,",:,,:., ~$ <,,'1'''''
~" <'
luria..
, '~":'~j'~~~l!';,
-; ~~, g",,~~,4~.tz~''''~r''oI' "
r~ ~.'
~,
~
'"
en
l5
'"
g>
:g
"-
~
c
'"
-'"
~
'"
.f
:I:
'"
~
'"
'"
.~
V'>
c
'"
'.,
~
'"
'-'
g
.~
o
n:
D
II"
.'
~'i! 'f
f,::,
,\" ,/~""
\.. ,!<
~.rl- ~
.. ~ .
;of .
f 'j. ~..~
'II, .'\'
, .
~,;'r
11
"
"~''.r :..::,.,;~ .
. ,)~Ha~;i~r;~'
j;M, ""',rflO"'''''~''':'''':;:i; ",,~e~ll'(?i
-i. >:: ; 'v".", _..," ~ '-, 'f :.;;f't, '!'-_1. :..~
~l. ~ Y .,. J~i
~fii~~?:~ ,;. f,i ~
'!.. " ,,_~,_:t'l. . ''\ .'
~- ~163~5-l )\~.~~tS~.I~
" .~.ti~;\...:'~,.~
iif;~i.;"-1j ";.,,-'d::F<fj~.fij;..~,i; ',~'~ ~i~
o
~
c
ci
:z:
~
""
,. ' ~e j; '{
";:,'.':':,: co' "i",e ;:.., ".-.;:.tr" " ".
PbAY;~S.lffiQ~.BY;.~A.W".,..t
.
AUTHORIZATION TO CONDUCT BUSINESS
IN THE STATE OF FLORIDA
certificate of Status
I certify Ii'om the records of this office that FLORIDA LEMARK CORPORATION is a
cOlporation organized ,mder lhe laws of the State of Florida. filed on March 24, 1987.
nle dOClunent munber of this corporation is M4890 I.
I further certify that said corporation has paid all fees due this office through December
31,2009. that its most recent 31111ual report/mufonn business rep0l1 was filed Oll January
16. 2009. and its slatus is active.
I fnrther certify that said corporation has nol filed Altic1es of Dissolution.
I further cel1ify that this is an electronically transm.ined celtificate authorized by section
15.16. Florida Stamtes, and anthenticated by this code. 09011700 1448-600 140985156# 1.
Giveu ,mder my hand and the
Great Seal of the Stale ofFlorid.1
at Tallahassee. the Capital. this lhe
Seveuteenth d.1Y of JamL11Y. 2009
l~
i!>>ccrrtar!' of ~tatc
~i'.;-,;M~
'"
en
~
'"
en
c
~
"-
~
c
'"
"'"
~
'"
en
'"
'"
:I::
'"
-<=
'"
'"
>
'"
V'O
c
'"
'6
~
..9
1]
.~
"
D:
,
o
8
0-
o
.;
:z:
~
""
~,~ :.~;~ :~..'-"
\",':'-:.;1" ~
l~. 'i I
.j' l,
\, ,.;..,,~,~,
SEQ# L08062000909
, , ""!' I
II
,"'i ...,~
~ <; :-J.\'C.~;?~~i~f~~d~
~..~,...~.=;.~" ">i:i~'~Jk~,:e;~.
. ~."~ ~~~~.:;t~~I~1;~<J:
...~~~;".)}~lrnf
"", ..,~(""~'}~~~,
~,~;'tJ',
~ ;: - ":"~ \1
_ Ii .;;~:. -'~'{'f;~~,~:L~1~
.,.0 CHUCK DRAGO,,,,,,., 0 ".'~~"';'~j.
INTERIM S.EqRETARYs,'ii\; ~,;:i'k~~'
'.~if '~i~~~:,--\'Jt~~~t
"
'\,
~:
1(-
~
"-':S:-f
.
AUTHORIZATION TO CONDUCT BUSINESS
IN THE STATE OF FLORIDA
Certificate of Status
I certify from the records oflhis office that O'LEARY RICHARDS DESIGN ASSOCIATES.
INC. is a corporation orl'anized IUlder the laws of the State of Florida. filed on November 07.
2002.
TIle doclUllent muuber oflhis corporation is P02000119658.
I further cCltify that said corporation has paid all fees due this ollice throuidl December 31. 2009.
that its mosl receut annual report/luufonn business repolt was filed on January 08. 2009. and its
status is active.
I further certify that said corporation h"s not filed Articles of Dissolution.
I fmther certify that this is an electronically Iransnulled celtificate authorized by section 15.16,
Florida Statules. and authenticated by tlus code. 090115002726-500140050815#1.
Given under my hand and lhe
Great Seal of the State of Florida
at Tallahassee. the Capital. this the
Fifteenth day of January, 2009
l~
i;!ccrctar!' of i;>latc
'"
en
c
'"
'"
en
c
~
"-
~
c
'"
-'"
.E
'"
en
'"
'"
::t:
'"
~
.2
'"
.~
'"
c
'"
ti
~
'"
'-'
g
'"
.;;;
J!
e
"-
~
o
g
ci
z:
~
""
.
CITY OF SUNNY ISLES BEACH ~
VILA & SONS LANDSCAPING
AUTHORIZATION TO CONDUCT BUSINESS
IN THE STATE OF FLORIDA
State of Florida
Department of State
I certity from the records of this office that VILA AND SON
LANDSCAPING CORP. is a corporation organized under the laws of
the State of Florida, filed on Febnmry 29, 1984.
The document number of this corporation is G99097.
I further certify that said corporation has paid all fees due this office
through December 31, 2009, that its most recent annual report was filed
on January 20, 2009, and its status is active.
I further certify that said corporation has not filed Articles of
Dissolution.
Gil'ell lI1,d~r nlY ',o"d and lite Greal Seat of
Florida. at Tallohasse'J II" Capilal, this the
-'~
Secretary of State
Autbentic.tion 10: 100U90%1I~14040709-G99097
To luthenticate thil cutiflCtltc.\'W1 the foUowiDl: lile. coler this
ro. llOd theu foU\YI\' the i.osrruction. displayed.
hltps:lleroe.suDhlz.or&!<ertaulhver.html
'"
go
o
'"
en
c
~
"-
~
c
'"
-""
.e
'"
en
'"
'"
:>:
'"
~
~
:!l
.~
V>
c
'"
t;
~
.3
g
.~
o
0:
;;
~
=
ci
:z:
~
""
.
AUTHORIZATION TO CONDUCT BUSINESS
IN THE STATE OF FLORIDA
CITY OF SUNNY ISLES BEACH ~
DUNKELBERGER ENGINEERING & TESTING
State of Florida
Department of State
I certitY from the records of this office that DUNKELBERGER
ENGINEERING & TESTING, INC. is a corporation organized under
the laws of the State of Florida, filed on Febmary 18, 1994.
The document number of this corporation is P94000013886.
I further certify that said corporation has paid all fees due this office
through December 31,2009, that its most recent annual report was filed
on March 26.2009, and its status is active.
I further certitY that said corporation has not filed Articles of
Dissolution.
Gil'lm under nlY "and alld t"~ Great S~al 01
Florida, at Tallahassee, 'he Capital, litis tI,e
T_"'~
Secretary of State
.\utbmricatioo ID: ~OOl"7$66!':9~J2809.r9"0000t38S6
To lutlwnri(:ate this l:atUlule,\'i.it Ibe foUo~in. ,ile. enter rbi,
10, and Ihen follow the in.trucrioni di.played
htlps:/I.m..sunblz.org/..rtauthvor.html
~tat~ ,.~(.~,!nrial1
Board of ~ - '~ngineers
,
esting, Inc.
.t/St t t t ff .. .
[loa a u es, 0 0 er englneenng services
. sed under Chapter 471, Florida Statutes.
Dunkelberg
Is authorized under the provisions of Se,
to the public through a Professional Engin
Expirat~on: 28-Feb-11
Audit No: 22820112187
Certificate of Authorization
CANo:
6870
DISPLAY AS REQUIRED BY LAW
'"
en
'"
C
'"
en
c
~
"-
~
c
'"
-'"
~
'"
en
'"
'"
:l:
'"
..c
'"
'"
.~
V>
c
'"
ti
~
8
~
j
e
"-
o
~
Q
d
:z:
~
""
.
REQUIRED FORMS
SWORN STATEl\ttNT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NafARY
PUBLIC OR OTIIER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
I. This sworn statement is submitted
to ,~ U~-{ ~ 6UNN-f ~~ ~p..,c.k\-
by :::>~ ~V.-..1\'~
for 1""7'. c... t-1'\
whose business address is
CP2-o \ "5W "'9-on\ oS \~ I -sez:~D ~
r1\.\ ~\, PL. ~~~1~
and (if applicable) its Federal Employer Identification Number (FEIN)
..9't - :l- ~1"3&tO 2>
(If the entity had no FEIN, include the Social Security Number of the individual signing this
sworn statement:
2. I understand that a "public entity crime" as defined in Paragraph 287.133(lXg), Florida
Statutes. means a violation of any state or federal law by a person with respect to and directly
related to the transaction of business with any public entity or with an agency or political
subdivision of any other state or of the United States, including, but not limited to, any bid or
contract for goods or services to be provided to any public entity or an agency or political
subdivision of any other state or of the United States and involving antitrust, fraud, theft,
bribery, collusion, racketeering, conspiracy, or material misrepresentation.
3. I understand that "convicted" or "conviction" as defmed in Paragraph 287.133(1)(b), Florida
Statutes means a fmding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial court of record relating to charges brought by
indictment or information after July I, 1989, as a result of a jury verdict. nonjury trial, or entry
of a plea of guilty or nolo contenders.
4. I understand that an "affiliate" as defined in Paragraph 287.133(1)(a), Florida Statutes, means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the management of the
entity and who has been convicted of a public entity come. The term "affiliate" includes
those officers, directors, executives, partners, shareholders, employees, members, and
agents who are active in the management of an affiliate. The ownership by one person of
shares constituting a controlling interest in another person, or a pooling of equipment or
income among persons when not for fair market value under an arm's length agreement,
shall be a prima facie case that one person controls another person. A person who
knowingly enters into a joint venture with a person who has been convicted of a public
entity crime in Florida during the preceding 36 months shalt be considered an affiliate.
'"
[
'"
en
c
:g
"-
~
c
'"
-""
~
'"
.f
:J:
'"
-<=
'"
'"
>
~
V>
c
'"
'6
~
.3
]
C:
~
""
0.
""
.;
:z:
~
""
16 .
REQUIRED FORMS
S. I understand that a "person" as defmed in Paragraph 287.133(1)(e), Aorida Statutes, means any
natural person or entity organized under the laws of any state or of the United States with the
legal power to enter into a binding contract and which bids or applies to bid on contracts for
the provision of goods or services let by a public entity, or which otherwise transacts or applies
to transact business with a public entity. The term "person" includes those officers, directors,
executives, partners, shareholders, employees, members, and agents who are active in
management of any entity.
6. Based on information and belief, the statement which I have marked below is true in a
relation to the entity submitting this sworn statement. (Please indicate which one (1) of the
following three (3) statements is applicable.)
~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and comicted of a
public entity crime within the past 36 months.
_(2) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, panners, shareholders, employees. members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of a
public entity crime within the past 36 months.
_(3) The entity submitting this sworn statement., or one or more of its officers. directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or agents who are active in management of the entity, or any affiliate
of the entity has been charged with and convicted of a public entity crime within the past 36
months. However, there has been a subsequent proceeding before a Hearing Officers of the State
of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer
determined that it was not in the public interest to place the entity submitting this sworn
statement on the convicted vendor list. (Attached is a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF TIllS FORM TO TIIE CONfRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS
FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH
DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE
P~RIOD OF THE CONTRACf ENTERED INTO , WHICHEVER. PERIOD IS LONGER. I
(ALSO UNDERSTAND T I AM REQUIRED TO INFORM THE PUBLIC ENTITY
\pRIOR TO ENTERIN 0 A CONTRACT IN EXCESS OF THE THRESHOlD AMOUNT
OVIDED IN SECT 7.017, FLORIDA STATUTES FOR THE CATEGORY 1WO OF
Y GE IN ORMATION CONT AlNED IN TIllS FORM.
~e ~\).N~~
(printed or Typed Legal NlfW~,of Affiant)
\\\" "I
,,\\ ~ClI0N Al'111
" o{~' ..... '1A, ~~
, S,,'... ...""Y,A r~
~ ~ ... Q~POIT",;.:TV!. -:;.
...C).V ~.~..
... '-> : .. ~ ..
=~: SEAL :~=
=~: 1983 :-f~
"C).. .~..
'~.~ .C)..
~?...t.OR\\)~ /~f
"", .... ..... "
/111 \\\'
11"1/ 111\'\\
'"
en
c
'"
'"
en
c
:g
"-
-g
'"
-""
ce
'"
en
.~
:I:
'"
~
.g
'"
>
'"
Vt
c
'"
i
.3
1!
'"
.~
.J!!
c
ct
~
."
0-
<=>
C
:z:
f2
0<
17 .
State of Florida of County of Miami-Dade r-1.-h
Sworn to and subscribed before me this ~ day of
~j /).L{~ E M O^,ILIJA
/ff!r~ MELISSA MARIE DELGADO
I~~~' MY COMMISSION #00541827
~i EXPIRES: APR 18. 2010
e..." W Bonded through 1st State Insurance
Notary's Name Printed, Stamped
Personally Known: / or Produced Identification _
IdentifiCAtion Produced
REQUIRED FORMS
/l-p/l. J L
. 2009 by
'"
en
'"
'"
'"
en
c
:s<
~
~
c
'"
-'"
~
'"
en
'"
'"
::t:
'"
~
'"
'"
.~
V>
c
'"
'5
~
.3
g
j
E'
"-
~
~
=
ci
z
~
0<
18 .
REQUIRED FORMS
NON-CoUtlStvE AFFIDA VIT
State of
Florida)
County of
Miami-Dade)
..:::>~ r?"\.VN\'u.,..p.. I ~~\O'erJ, being first duly sworn, deposes
and says that:
(1) Helshe is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has
submitted the attached Bid;
(2) Helshe is fully informed respecting the preparation and contents of the attached Bid and
of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded, conspired,
connived or agreed, directly or indirectly, with any other Bidder, finn, or person to submit a
collusive or sham Bid in connection with the Work for which the attached Bid has been
submitted; or to refrain from bidding in connection with such Work; or have in any manner,
directly or indirectly, sought by agreement or collusion, or communication, or conference with
any Bidder. ftrm. or person to fu the price or prices in the attached Bid or of any other Bidder, or
to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder,
or to secure through any collusion, conspiracy, connivance, or unlawful agreement any
advantage against the City of Sunny Isles Beach, Florida, or any person interested in the
proposed Work;
\\\'11/1/1/1
,,\\ ~C110N I./'~I
,"';;"~ ......... '11// ......,
~ ~ ....O?-POR-1..<"1Q'-:.
.. <:J . c; l'^. 00<'\ 0#
..C.). \'.\~-
=:::!E:. SEAL .~rn:'
_=:>- .z-
:. :z;. ~. 1983 : -f =
o#~. .::2-
.". tP-':,- ;<::-; . ~....
~?...I.OR\\)~/~~
"/ .... ..... ,.....
...... "
"'" \\'
1111/ 111\\\\
'"
[
'"
en
c
~
"-
~
c
"
~
~
'"
en
'"
'"
:I::
'"
~
'"
'"
.~
V>
c
'"
t
~
'"
'-'
11
.~
'0
Q:
) The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, conspira ,connivance, or unlawful agreement on the part of the Bidder or any
ther of its agents. r tatives, owners, employees or parties in interest, including this
..:>~ f?'.UN~~ , ~c.-.f"7"'\
(Printed or Typed Legal Name of Affiant)
c;
""
C>
0-
C>
.,;
Z
~
""
20
.
REQUIRED FORMS
State or Florida or County of Miami-Dade
Sworn to and subscribed before me this 1ft, day of
Ih ILl t.,
, 2009 by
ldentification Produced
'"
en
"
'"
'"
~
:;;;
<;
"-
]
-'<
cE
'"
en
.~
::I:
'"
~
'"
'"
.~
V>
c
"
i
.3
]
ct:
5
8
d-
e:>
0
:z:
~
""
21 .
~
ZURrCH
April 7,2009
Selection Committee
City of Sunny Isles Beach
Sunny Isles Beach Government Center
18070 Collins Avenue, 1st FIr.
Sunny Island Beach, FL 33160
RE:
MCM
Project:
RFQ# 09-03-01 Professional Construction Services for the Heritage Park and
Parking Garage
$12,500,000,.00
ECP:
Dear Sir or Madam:
Zurich American Insurance Company is currently acting as the surety for MCM. Zurich American
Insurance Company has an A.M. Best Rating of A XV and a US Treasury listing of $607,756,000 and is
a surety company licensed to transact business in the State of Florida.
Zurich American Insurance Company will consider providing bonds for MCM up to $100,000,000 for
any single project and an aggregate program of $400,000,000.
Please understand that our ability to provide any surety credit is based upon normal and standard
underwriting criteria applied at the time of their request. This includes, but is not limited to a review
of the contract documents, and appropriate construction funding, if applicable.
We are pleased to share with you our favorable experience and high regard for MCM. This letter
does not constitute an assumption of liability and we assume no liability to you or to any third parties
by the issuance of this letter.
Should you need any additional information please contact me at 305-423-2202.
Sincerely,
Zurich American Insurance Company
By:
Sonia M. Paneque, Attorney-In-Fact
Moo
ACKNOWLEDGEMENT OF SURETY
STATE OF Florida,)
COUNTY OF Miami Dade,)
ON THE 7th DAY OF April, 2009 , BEFORE ME PERSONALLY CAME Sonia M.
PaneQueTO ME KNOWN, WHO, BEING BY ME DULY SWORN, DID DEPOSE AND SAY
THAT (S)HE RESIDES AT Miami Dade. FL THAT (S)HE IS THE ATTORNEY-IN-FACT
OF Zurich American Insurance Company THE CORPORATION DESCRIBED IN AND
WHICH EXECUTED THE ABOVE INSTRUMENT; THAT (S)HE KNOWS THE SEAL OF
SAID CORPORATION; THAT ONE OF THE SEALS AFFIXED TO THE FOREFGOING
INSTRUMENT IS SUCH SEAL; THAT IT WAS SO AFFIXED BY ORDER OF THE BOARD
OF DIRECTORS OF SAID CORPORATION; AND THAT (S)HE SIGNED HIS/HER NAME
THERETO BY LIKE ORDER.
~L::~_____
Public .
:i~Y~~<t:. JOSE L. RODRIGUEZ
f':':'J;.~ ::~ MY COMMISSION # OD672388
~J;~~" EXPIRES May 10,2011
"',(nt~\\\ .
(407) 393-0b3 FloridaNotaryServlce.com
. _ -.! ->1'x:Z .
. f\ \ ;::.;-.. ;:>.\< , =r">.C::>t:-
., . _. .:-:\;':;;f..',,:": . _~;.~ ;;>\rC~.d.g~~;: O::;;'Ti' ..,
_._;:<.~.~, :":,. ~_;~'" :,:.(._,..... 'J C....\:::>1 r'ln......~..; I~Di-'G'"ii:. -":.J .:
~_,~.~:.;'<';..._. "",", .~l'- . ~~::;-.~~ .-- --:--",,".~-'
._....,...~ , ol.., ' St3"'''''~"-~ ",'..f. '. ..
::'(;".:..~'C ""'.:8:: . _)~b':f:-'~-~l*.g~E~~"':;"/:~Jf
, ,...., .,;" "\\Ti:J:'J\p...Rr8,-~:;,,!:~o"';'~'!J};;;'~;:d.,,
. ,', ~.~I~ ....~: ;';~>' sOI'\lr' -; ~~ 5.i'''::;;'A~99?;)~'';:~="'''!SJ''0Nc.C
i",~ \ \;,. - "",,,,,."\-, i'\J.f\\be\.~"~." .; CJ$""sor.\h r',.'. -
. ~\;:', ~,; th~> ,:.uc.e.nse:.I::: ",' .=--,;~'~D\.~O"',l\l~~" ~;;'1g'O,,/i~/19B';;>
.:;.,":;.~\r'- V'i"> t"~;,~~~."c.' ..'- ':, ;, ~"'"):'t;;. ;"F'
. :. .. .,'1" !.h~; \s \..\~N:;;- .__' ~;. r ;:;io'P ~;. rt: ;:> "-<>,,
':.:~"" "i;;. . ~ -'.~:--':...';.':;-o.e:$. ?\,-;..-- ,. >--;:..~-'. -
.':<-... ,.... ~ . ~;,u--- ."-: ". .'- r..., ~,,,,,,,,. =":
j~O /' G'f~.l0".~~~.t.r::7 ~
_~1~~:\ \ ' ..;,'" ;;"jJi~.J'''''''\>:;;; -~., .~.~-:;. .' ~=",.
R,<~,.~D" ~ ~ ~-- ~''!:i-::~.t.. . f ., --:=- -;f.;f-,~_'" ..:... .
'."" _ _ ~c """:~-..:..,.::-r,;\.:,;,:-:;..:i;"" -... "'-,,!,.,::.....:. . ... ....'
\ :(,g.I:::.->- 1"':'. --~,..,.\!,.\ ",-..-;>- .......,--"'" .
-~. · . '~~'-~rf~~!f(:-:' '.' "
:. ~~_r;;i~},;:~i:".~cc
oJ fr.....':.or .
~ ~~":)!!"\t~~....
~-:;.~~~~;~.;;~;.. .'~ !'~ a::~
- - ~..-
.-
,I
ZURICH AMERICAN INSURANCE COMPANY
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS, that the ZURICH AMERICAN INSURANCE COMPANY, a corporation created by and existing
under the laws of the State of New York does hereby nominate, constitute and appoint Sonia M. PANEQUE, Jose L. RODRIGUEZ and
Olga L. IGLESIAS, all of CORAL GABLES, Florida, EACH its true and lawful Attorneys-In-Fact with power and authority hereby
conferred to sign, seal, and execute in its behalf, during the period beginning with the date of issuance~f this F<<1 any and all bonds and
undertakings, recognizances or other written obligations in the nature thereof, and to bind CffiII~RICAN INSURANCE
COMPANY thereby, and all of the acts of said Attomey[s]-in-Fact pursuant to these presff(~\fPfe 1 e a ~pfirmed. This Power of
Attorney is made and executed pursuant to and by the authority of the foil j~-~d\llYado~ rr tlm-d of Directors of the
Company which By-Law has not been amended or rescinded. ~ \) '"
Article VI, Section 5. "...The President or a Vice Pres] e,\t1P) .@: I S urn t.ff It: M' etary or an Assistant Secretary may
appoint any person Attorney-In-Fact W~'th t t x~t ~uret n8S. c ~hhe Company and other formal underwriting
contracts in reference thereto an e' del ents~8 t clitIhal polices and bonds of all kinds and attach the corporate
seal. Any such officers m ~ '" p ers e 0 ey-In-Fact."
This Power of Attorney is s~. e al~~~i~ er and by the authority of the following Resolution adopted by the Board of
Directors of the ZURICH A ~COMP ANY by unanimous consent in lieu of a special meeting dated December 15,
1998
" RESOLVED, that the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant
Secretary and the seal of the Company may be affixed by facsimile on any Power of Attorney pursuant to Article VI, Section 5 of the
By-Laws, and the signature of a Secretary or an Assistant Secretary and the seal of the Company may be affixed by facsimile to any
certificate of any such power. Any such power or any certificate thereof with such facsimile signature and seal shall be valid and
binding on the Company. Furthermore, such power so executed, sealed and certified by certificate so executed and sealed shall, with
respect to any bond or undertaking to which it is attached, shall continue to be valid and binding on the Company."
IN WITNESS WHEREOF, the ZURICH AMERICAN INSURANCE COMPANY has caused these presents to be executed in its name and on
its behalf and its Corporate Seal to be hereunto affixed and attested by its officers thereunto duly authorized, this 13th day of November, A.D.
2007.
,,'It......I.
,..,~~~..~~~u~"...,
!~....~~"f'O,;.~.~o\
:~!:t ~\~~
:c:(: -.- 10:
;~~. }2;
,~'. 1998 .S"
~,(S..~...... .......rot.:!
'. ~ ......... .,.~~....
"#'#MI". * "....,....
...... STATE OF MARYLAND}
55:
CITY OF BALTIMORE Eric D. Barnes Secretary Frank E. Martin Jr. Vice President
On the 13th day of November, A.D. 2007, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified,
came the above named Vice President and Secretary of ZURICH AMERICAN INSURANCE COMPANY, to me personally known to be the
individuals and officers described in and who executed the preceding instrument and they each acknowledged the execution of the same and
being by me duly sworn, they severally and each for himself deposed and said that they respectively hold the offices in said Corporation as
indicated, that the Seal affixed to the preceding instrument is the Corporate Seal of said Corporation, and that the said Corporate Seal, and their
respective signature as such officers, were duly affixed and subscribed to the said instrument pursuant to all due corporate authorization.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above.
ZURICH AMERICAN INSURANCE COMPANY
~)),~
~i?!tz~/
By:
Notary Public My Commission Expires: February I, 2009
This Power of Attorney limits the acts of those named therein to the bonds and undertaking specifically named therein, and they have no
authority to bind the Company except in the manner and to the extent herein stated.
CERTIFICATE
I, the undersigned, a Secretary of the ZURICH AMERICAN INSURANCE COMPANY, do hereby certify that the foregoing Power of
Attorney is still in full force and effect, and further certify that Article VI, Section 5 of the By-Laws of the Company and the Resolution of the
Board of Directors set forth in said Power of Attorney are still in force. ",'..':,;,'iNS":~""
..... r---': v~"
IN TESTIMONY WHEREOF I have hereto subscribed my name and affixed the seal of said Company ~,'<?>u,,"";~.""'~""
~ ~ /~<:P 'l4,.., \9..~
= 00;;' ! ~ 0 ~ \'. ~
..c(. -.- 10:
~~\ 10:
~~\ 1998 /Si
~ \or.: ..... .....-.rA: .,
".,"~ ....h.u.~. }.~ ,..-
"~., * .~....
""I"..""
fDpJ
the 7 th
day of April 2009
~1Jt< l1t1~'O
Gregory E. Murray
Secretary
POA-Z ZA 031-00588
Serial Number: KE2007November13ZA 11/07ZA 031-00588
ZURICH AMERICAN INSURANCE COMPANY
COMPARATIVE BALANCE SHEET
ONE LIBERTY PLAZA, 165 BROADWAY, 32nd FLOOR, NEW YORK, 1\'Y 10006
As or December 31, 2007
12/31/2007 12131/2006
Auell
Bonds $19,087.378.076 )18,073,352,872
Preferred Stock 133.381,994
Common Stock 2,809,606,857 2,849,618,678
Real Em.le 28,007,629 30,557,423
Othc:- Invested AsS<:ts 540,121.817 299,554,188
Short-term IrM:stments 163,510,422 304,091,911
Cash 1,391,371,897 2,530,185,882
Employ:.: Trust for Deferred Compensation Plan 90,692,030 80,328.263
Total Cash and Invested Assets 24,244,070,722 24,167,689,217
Premiums Rl=ivablc 5,073,765,258 4,4ll0,227,698
Funds Held with Reinsurer;; 17,702,845 17,616,017
Rcinsunmce Recovemble 680,285,692 1,213,858,365
Accrued Inveslm:nt Jncome J 59,844,556 155,518,130
Federa.1lncome Tax Recoverable 603,657,275 546,748,319
Due from Affiliates 181,822,075 174,161,797
Ollie:' Assets 846,868.830 757,598,5&2
Total Assets 31.808,017.253 31,513,418.125
LiAbilfties and Pollcvbolde..... gDrplm
liabilities:
Loss and LAE ~ 14,426,948,909 14,149,869,727
Loss Portfolio Traru:fCI' (9,811,239)
Unearned Premium Reserve 5,032,276.309 4,622,977,469
Funds Held with Reinsurers 252,617,358 250,851,3&3
Loss In Course orPa)n1ent 643,699,182 394,524,981
Commission Reserve 154,237,25& 119.963,062
Federallncocne Tax Payable 24,209,808 35,410,569
Remittaoces and I=s UTUlIoc.e.t.cd 212.916,937 243.556.654
Payable to parent. subs lUId affiliats 229.548,310 329,287,394
Provision for Reinsurance 112,368,418 1l9.083,992
Ceded Reins= Premiwns Payable 522,715.017 957,965,095
Securities Lending Collateral Uabnity 1,229,669,401 2,096.100,376
Other Liabnities 2.222,098,055 2,166.&42,890
Total liabilities 25,063,304,962 25.476,622,353
PoUC)holdm' Surplus:
Common Capital Stock 5,000,000 5,000,000
Paid-ln and Contributed Surplus 4,394,131,141 4,394.131,141
Surplus Notes 1,883,000.000 2,014,300,000
Special Surplus Retroactive R.c:insurance 55,614.000 &0,956,000
Cumulative UnreaH~ed Gain 11~,44I,1 00 575,279,074
Dividends UndCl:lared 268,045 450,941
Loss Portfolio TI'1MfCI' AccIlWlt 9.811,239
Unassigned Surplus 278.258.005 (1,043.132,623)
Twl Polic:yholders' Surplus 6,744,712.,291 6.036,795,772
Total liabiliti:s and Policyholders' Surplus 31.808.017.253 31.513.418.125
I, DAVID A. BOWERs, Corporate S=wy of ZURlCH AMERJCAN INSURANCE COMPANY do hC1'eby certify
that the roregoing staltment is a correct exbibit of the ass:t3 and liabilities of the said Co ny. on the
31st day of December, 2007, llCl:ording to the best ormy informatio,. go and belie
SlJ.~ efllline;s
County of Cook
orporale SC=Ulry
} 55:
MARLO G. SARABYN
v.'t' COMMISSION EXPIRES
NO\'=M8ER 25. 2011
^^"^^
-
Martin E. Sapp
Vice President
Middle Market Banking
SunTrust Bank
777 Brickell Avenue. Me 1042
Miami, FL 33131
Tel 305.579.7268
Fax 305.579.7133
martin .sapp@suntrust.com
SUNTRUST*
April 6, 2009
Selection Committee
City of Sunny Isles Beach
Sunny Isles Beach Government Center
18070 Collins A venue, 151 Floor
Sunny Isles Beach, FL 33160
RE: Munilla Construction Management LLC d/b/a MCM
Dear Selection Committee:
Please be advised that MCM has been a client of SunTrust Bank since 2006 and that MCM
maintains both a depository and credit relationship with SunTrust. The depository accounts
maintained with the Bank have a current and 12-month average balance in the moderate seven
figure range. MCM also maintains balances in an overnight investment account in the high
seven figures.
In addition to the depository relationship, MCM has a line of credit in the medium seven figure
range with the total amount of the line currently available. All accounts and credit facilities
have been handled in a satisfactory maimer.
Please note that the information and opinion provided are given in confidentiality for your use
only and is furnished as a matter of business courtesy on the expressed understanding that no
responsibility is assumed on the part ofthe Bank or any of its officers whether in tort, contract
or otherwise.
Please call me at 305-579-7268 if I can be of any further assistance.
Sincerely,
JjaAl'~
Martin E. Sapp
Vice President
ACORDrr. CERTIFICATE OF LIABILITY INSURANCE I DATE (MMlDDIYYYY)
4/3/2009
PRODUCER Phone: 305-423-2200 Fax: 786-662-6776 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
Allied North America Insurance Brokerage of Flo ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
550 Biltmore Way, PH2 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
Coral Gables FL 33134 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
INSURERS AFFORDING COVERAGE NAIC#
INSURED INSURER A: American Zurich Insurance Comn 40142
MCM of South Florida, LLC & Acousti INSURERB:American Guarantee & Liabilit ::>6247
of South Florida, LLC DBA MCM-Acousti, JV
6201 SW 70th., 2nd Floor INSURER C:
Miami FL 33143 INSURER D:
INSURER E:
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.
NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE
TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR ~~~.~ POLICY EFFECTIVE POLICY EXPIRATION
LTR POLICY NUMBER LIMITS
A ~ERAL LIABILITY GL09674006-00 9/30/2008 9/30/2009 EACH OCCURRENCE $ 1 000 000
L 3MMERCIAL GENERAL LIABILITY ~~~~~~~9E~~~~ncel nOD 000
-' CLAIMS MADE IiJ OCCUR MED EXP (Anyone person) $ 10 000
- PERSONAL & ADV INJURY $ 1 000 000
e-- GENERAL AGGREGATE $2 000 000
n'LAGGREGATE LIMIT APn PER: PRODUCTS - COMP/OP AGG $ 2 000 000
POLICY -G{l \~PT LOC
B ~TOMOBILE LIABILITY BAP9674007-00 9/30/2008 9/30/2009 COMBINED SINGLE LIMIT
eX- ANY AUTO (Ea accident) $1,000,000
f.- ALL OWNED AUTOS BODILY INJURY
$
SCHEDULED AUTOS (Per person)
-
lL HIRED AUTOS BODILY INJURY
$
lL NON-OWNED AUTOS (Per accident)
PROPERTY DAMAGE $
(Per accident)
~RAGE LIABILITY AUTO ONLY - EAACCIDENT $
ANY AUTO OTHER THAN EA ACC $
AUTO ONLY: AGG $
B ~ESS/UMBRELLA LIABILITY AUC9674122-00 9/30/2008 9/30/2009 EACH OCCURRENCE $25 000 000
X OCCUR D CLAIMS MADE AGGREGATE $25 000 000
$
=i DEDUCTIBLE $
RETENTION $ $
B WORKERS COMPENSATION AND WC9674008-00 9/30/2008 9/30/2009 X I WCSTATU- TX IOJ,tt-
EMPLOYERS' LIABILITY
ANY PROPRIETORlPARTNERlEXECUTIVE E.L. EACH ACCIDENT $1 000 000
OFFICER/MEMBER EXCLUDED? E.L. DISEASE - EA EMPLOYEE $1 000 000
~~~';;~C~~~V~4~NS below E.L. DISEASE - POLICY LIMIT $ 1 nnn nno
OTHER
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
FQ #01-03-01 Professional Construction Services for the heritage park & parking garage.
CERTIFICATE HOLDER CANCELLATION.. 0
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED
City of Sunny Isles Beach BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER
WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE
Sunny Isles Beach Government Center CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO
18070 Collins Avenue., City Clerk SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON
Sunny Isles Beach FL 33160 THE INSURER, ITS AGENTS OR REPRESENTATIVES.
AUTHORIZED REPRESENTATIV~
· ~. p~tfJl-'1-
ACORD 25 (2001/08)
@ACORDCORPORATION 1988
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon.
ACORD 25 (2001/08)