Professional Construction Services
RFQ #09-03-01
Heritage Park and Parking Garage
Presented to:
City of Sunny Isles Beach
City or Sunny Islgs Beach
Office or the City Clerk
April 8, 2009
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FI 33160
Re: RFQ No. 09-03-01, Professional Construction Services for Heritage Park and Parking Garage, Letter
of Interest
Attn: Rick Conner, City Manager
First, we would like to thank you and the City of Sunny Isles Beach for the opportunity to submit
our qualifications for your consideration. Second, why should you invite Current Builders to the second
phase? There are a number of relevant reasons that I would like you to consider that are discussed in
further detail within our submittal as follows.
~ Our Approach to the Project: Within our submittal we took a team approach to the uniquely
different projects of the garage and park combining our garage building expertise with a firm who
has significant park experience and with whom we have worked with previously.
~ Building Information Modeling also known as B.I.M: This new three dimensional plan
coordination tool also known as Virtual Design and Construction has been adopted by Current
Builders and recently used on a similar Design/Build garage with great success speeding the
construction timeframe while reducing change orders.
~ Competitive Costs: A unique capability of Current Builders is our ability to self perform concrete
structures which make up 35-40% of the project cost. This is accomplished with our CB
Structures group.
~ The Partners: Each project is assigned what we call a P.I.C., otherwise known as a principle in
charge. The Owners, Design team and project team are always dealing with a partner that can
make decisions quickly and responsibly.
~ Our Culture: The industry is slowly moving away from the "silo" mentality where Owners,
Architects and Contractors think and work independently in their respective silos to more
integration and collaboration. We support this. Each of our projects start with a third party
facilitator to teach team building to the project team enabling better collaboration between all
parties and creates a partnering mentality.
We sincerely hope that we will have the opportunity to provide a proposal in phase two so we can
show the committee how we can provide very competitive pricing without sacrificing quality, safety and
collaboration through our adoption of the newest leading technology.
Finally, the selection of a CM/GC comes down to your confidence that the firm can perform to the
required level that is required and if they give you the level of personal service you deserve. We have a
proven record for over 35 years managing successful projects and relationships, as we know each project
is unique and demands a new commitment to success. This commitment begins with our submittal of
qualifications.
C'I~urs~
Charles P. Reid
CEO
CB Constructors, Inc.
2lPage
Question 1 History of the Firm
~ Current Builders started in 1972 as a General Contractor specializing in structural concrete
structures as a subsidiary of Gulfstream Land and Development.
~ In 1973 two present shareholders join the firm.
~ In 1976 the present CEO joins the firm.
~ In 1976 Current Builders started doing work as an open shop general contractor on the east and
west coast of Florida
~ Four principles in the firm have spent their whole career at Current Builders spanning over 130
years with the firm.
~ In 1981 Current Builders is awarded its first public project for Broward Community Center to
construct a library. The project was awarded the Governors Design and Construction award.
~ Current Builders ranked #287 in 1982 on ENR top 400 US Contractors
~ In 1985 Current Builders separates from its parent company and becomes a private company
~ In 1988 Current Builders aligns with Travelers, the nation's largest surety to provide bonding and
we remain with them today.
~ In 1993 Current Builders does its first design build project for Edy's Grand Ice Cream, a storage
and distribution facility in Weston
~ Current Builders opens a branch office in Naples/Ft Myers in 1997 to better serve its clients that
work on the west coast
~ Current Builders opened a branch office in Orlando in 2002 and relocated the office to Tampa in
2005.
~ Current Builders University is created in 2003 as a vehicle to provide continuing education for our
employees and a 100 person classroom is constructed at the Pompano headquarters
~ In 2004 Current Builders was awarded two design build garages using a nearly identical framing
system as the Sunny Isles garage.
~ The South Florida Business Journal awarded Current Builders the Business of the Year in 2005
~ In 2006 Current Builders receives the S.H.A.R.P safety award and is one of only five contractors
in the state to receive this award.
Question 1 Ownership, key management and time at Current Builders
~ CEO Charles P Reid - 34 years
~ President Michael Taylor - 27 years
~ CFO Rick Colandreo C.P.A - 13 years
~ COO Charlene Faber - 27 years
~ Senior Vice President Richard Carr - 36 years
~ Senior Vice President Hank Huisman - 37 years
~ Senior Vice President Robert Schnurman - 17 years
~ Vice President William Blackledge - 25 years
3lPage
Question 1 Key Management
~ Chip Angenendt - Vice President Tampa - 4 years
~ Elizabeth Leng - Human Resources Director - 7 years
~ John Cline - Director of Risk Management and Quality Control - 34 years
~ Jorge Costas - Vice President Marketing - 7 years
~ Rolf Severtson - Vice President Structures - 5 years
Question 2 A summary of any company changes that are anticipated to occur during the project
~ We do not anticipate nor have scheduled any management changes within the timelines of this
project.
Question 3 Location of corporate headquarters and other divisional offices.
~ Corporate office: Pompano Beach, Florida
~ Branch offices: Naples, Tampa
Question 4 Location of office{s) that will be involved in the project during pre-construction and
potential construction phase services.
~ The corporate office in Pompano Beach will provide all estimating, preconstruction and
construction services.
~ CB Structures, the structural division of Current Builders operates from the Pompano Beach
corporate office.
4lPage
Question 5 Description of contractor's project team to include the name, responsibilities and resumes of
key personnel that will be assigned to this Project.
William Blackledge - PrinCipal in Charge: Results driven professional with over 25 years experience in
the management of large scale survey and engineering construction projects. History of directing projects
through all phases from initial conception to final closeout. Cost conscious with track record in developing
new construction concepts to control costs, enhance efficiency, and improve productivity. Planned and
executed strategy which led to the successful completion of projects ahead of forecasts. William is a
diligent leader with solid business planning, and problem solving skills. Skilled negotiator and
communicator; particularly with owners, architects, engineers and building officials.
Licensures/Education/Affiliations: Broward Community College. Associated General Contractors Project Managers
Course. Member of the AGC of South Florida. OSHA Jobsite Safety Certification (30 Hour)
Major Projects:
Boca Colonnade Phase II
4 story Class" A" Office Bldg
4 story 477 parking space garage
Boca Raton, FI - $15,000,000.00
Marina Village
349 High end residential units
6 story - 846 parking space cast in place garage
Boynton Beach, FI - $49,000,000.00
Boca Grand
164 luxury units
5 level parking garage with 391 spaces
Boca Raton, FI - $24,000,000.00
Riviera Yacht and Beach Club
212 residential units and health club
parking structure
Hallandale, Fl - $23,100,000.00
Aaron Buttress - Project Manager - LEED, AP - Aaron has over eight years of experience in the
management of large scale construction projects. Aaron posses a diverse knowledge in construction
methods in both business park development and residential projects including structural steel, cast in
place concrete and precast concrete structures. History shows a proven track record of coordinating
projects with adverse conditions. Aaron also specializes in multi-level parking garage development.
Licensures/Education/Affiliations: University of Florida Bachelor of Building Construction. LEED Certified AP . OSHA
Jobsite Safety Certification (30 Hour)
Major Projects:
Boca Colonnade Phase II
4 story Class "A" Office Bldg
4 story 477 parking space garage
Boca Raton, FI- $15,000,000.00
Block 69 Parking Garage
5 story parking garage with 202 spaces
Delray Beach, FI $15,000,000.00
Boca Grand
164 luxury units
5 level parking garage with 391 spaces
Boca Raton, FI- $24,000,000.00
The Moorings at Lantana
378 residential units
6 story design build parking garage with 585 spaces
Lantana, FI - $50,000,000.00
5lPage
Question 5 Description of contractor's project team to include the name. responsibilities and resumes of
key personnel that will be assigned to this Project.
Ken Walker - Project Superintendent - Ken has over 30 years experience in the management of
various types of construction. He started his career on one of the first nine story condominium projects
in Naples, Florida. Since that time he has advanced in the construction industry to varied positions of
supervision and responsibility. Ken has a histy of directing projects through all phases from initial
conception to final closeout. He is adept at design scopes of work in order to assure proper coverage
and in managing multiple projects simultaneously.
Licensures/Education/Affiliations: OSHA Jobsite Certification (10 hour and 30 hour). Class B General Contracting
License. Management Training. Carpentry Journeyman Training
Major Projects:
440 Flagler Village
218 high end residential units
5 story 366 parking space garage
Ft Lauderdale, FI - $44,400,000.00
Seaside at Key West
96 Luxury Townhome Units
Key West, FI- $20,528,132.00
Belmont Place
Wood frame residential units
Complex 4 story split garden style apartments
Marietta, GA - $25,000,000.00
Dave Talbert - Senior Superintendent Structures - Dave is a result driven professional with 22 year
tenure at Current Builders and experience in small and large-scale construction projects. Dave has a
history of directing projects through all phases. Dave is a diligent leader with a extensive working
knowledge of building codes and regulations including OSHA. He is very adept in managing general
building trades and technical elements of architectural maintenance and construction and especially
proficient in building layout and concrete formwork of all types.
Licensures/Education/Affiliations: Broward Community College (Civil Engineering Program). AGC Supervisory
Training Program · OSHA Jobsite Safety Certification (10 hour and 30 Hour)
Major Projects:
440 Flagler Village
218 high end residential units
5 story 366 parking space garage
Ft Lauderdale, FI - $44,400,000.00
Block 69 Parking Garage
5 story parking garage with 202 spaces
Delray Beach, FI $15,000,000.00
Marina Village
349 High end residential units
6 story - 846 parking space cast in place garage
Boynton Beach, FI - $49,000,000.00
Moorings at Lantana
378 residential units
6 story design build parking garage with 585 spaces
Lantana, FI - $50,000,000.00
6lPage
BURKHARDT
CONSTRUCTION, INC.
Question 5 Description of contractor's project team to include the name, responsibilities and resumes of
key personnel that will be assigned to this Project.
Vincent G. Burkhardt - President: Vince Burkhardt is the founder and President of Burkhardt
Construction, Inc. He has over 34 years experience serving as project principal and assumes direct and
ultimate responsibility for all construction projects. Vince is responsible for all corporate and
construction administration.
Professional Credentials
· Bachelor of Science in Building Construction, University of Florida, 1972.
· Associate of Arts degree, Palm Beach Junior College, 1970.
· Continuing Education
Numerous industry related seminars for professional improvement and license renewals.
· Certified General Contractor, State of Florida, CGC003711
Major Projects:
· 6th Avenue South Streetscape Improvements, 2007, Lake Worth CRA
Construction Value: $8,265,674.00
· Hollywood Beach Boardwalk & Surf Road utility Improvements, on-going, Hollywood Beach CRA
Estimated Construction Value: $25,000,000.00
· Boynton Beach Boulevard Extension and Promenade, 2006, Boynton Beach CRA
Construction Value: $8,839,819.00
· South Second Street Streetscape, 2004, City of Fort Pierce
Construction value: $987,000.00
Dennis Haynes - Vice President. He has over 35 years experience in the construction industry, serving
the last 17 years as chief project manager of the horizontal and streetscape construction at Burkhardt
Construction. He has directly overseen construction projects ranging from $250,000 to over $20 million.
He has successfully worked with many municipalities throughout Florida, resulting in successful
streetscape and park projects as well as repeat business relationships
Professional Credentials
· Palm Beach Junior College, Lake Worth, Florida.
· Allstate Construction College, Fort Lauderdale, Florida.
· Certified General Contractor, State of Florida, CGC007105
Maior Projects:
.
Ruby Avenue, Monument Avenue, Dakin Avenue and Sproule Street Design/Build
Streetscapes, On-going, Kissimmee, FL
Estimated construction value: $4,000,000.00
Barton Boulevard Design-Build Streetscape, On-going, Rockledge, FL
Estimated construction value: $7,271,000.00
Ocean Drive & Beachland Boulevard Intersection Improvements, 2005, City of Vero Beach
Construction Value: $167,125.00
Avenue A Streetscape, 2005, City of Fort Pierce
Construction value: $508,912.00
.
.
.
7lPage
Question 6 Describe how contractors' team will be organized and assigned responsibility for this
Project.
Aaron Buttress - Project Manager, L
AP
Burkhardt Const.
Superil'ltendent -
Structures
Burkhardt Const.
8lPage
Question 7 Description of recent project experience, including projects of similar size, and client references
with contact information,
Block 69 Parking Garage
..... In addition to building a quality project, the involvement
by the management and principals brought the project
success in both time and budget. This was a complex, city
center project involving below grade water issues,
construction within 2 inches of adjoining residential
structures, as well as traffic and pedestrian issues. They
were truly a team player and worked with our staff in
overcoming any and all obstacles."
Bruce Jarvis - President
The Bruce Group
(Owners Rep)
561-330-9106
Boca Colonnade Parking Garage
......The entire project included involvement by the principals
and senior staff, which were instrumental to bringing the
project in on budget and in a timely manner. Their ability to
work with our people as team players was a key to the
successful delivery of the project. I have enjoyed working
with Current Builders on several past projects and will bring
them in to work together in the future."
George Ledwith V P of Development
Liberty Property LP
561-999-0310
Description: 202 parking spaces - parking for the City of Delray Beach
Original Contract: $7,128,172.00 Final Contract: $7,445,172.00
Final Completion: 2007 Construction Services: Negotiated GC
Owner: Block 77 Development Architect: Perez Design
Description: 4 level, 477 parking space garage-tilt wall construction
Original Contract: $14,556,722.00 Final Contract: $14,589,330.00 ..
.. contract was inclusive of garage and office building
Final Completion: 2008 Construction Services: CM @ RisklGMP
Owner: Liberty Property LP Architect: RLC Architects
9lPage
(
Question 7 Description of recent project experience, including projects of similar size, and client references
with contact information.
Radius Parking Garage
"This project consisted of a 15 story condominium with 304
high end units, and a seven-story, 752 parking space,
poured in place garage. This project was located in a
downtown urban area of Hollywood, Florida. This project
was successfully built, with team efforts from the contractor,
owner, and design team. Current Builders contribution to
this project was greatly appreciated and we look forward to
working together in the future."
Stacey Wyatt
Hollywood Young Circle LP
770-231-6023
440 Flagler Village Parking Garage
".....Everyone in our firm has enjoyed working with Current
Builders. The construction of complex buildings such as
these in a manner satisfactory to both the owner and
contractor mandates a universal bias for teamwork and the
thoughtful balance of everyone's priorities. We have found
Current to be an invaluable contributor to the success of our
project and we look forward to working with them on many
future buildings."
Greg West Sr Vice President
Zom Florida, Inc.
954-779-7950
Description: 752 space parking garage
Original Contract Amount: $7,992,380.00 Final Contract Amount: $9,410,606.00
Owner: Hollywood Young Circle, LP Architect: MSA Architects, Inc.
Final Completion: 2007 Construction Services: Negotiated GC
Description: 366 parking space garage enclosed by a wrap around building
Original Contract Amount: $5,700,000.00 Final Contract Amount: $5,700,000.00
Owner: Zom Florida, Inc. Architect: Horton Harley & Carter
Final Completion: 2009 Construction Services: Design Build
10lPage
BURKHARDT
CONSTRUCTION, INC.
Question 7 Description of recent project experience, including projects of similar size. and client
references with contact information.
Boynton Beach Boulevard Extension and Promenade - Boynton Beach, FL
Customer and owner: City of Boynton Beach CRA
Current status: Completed 2006
Description: Burkhardt Construction served the City of Boynton Beach CRA for construction of a
streetscape project along the Intracoastal Waterway involving the extension of Boynton Beach
Boulevard. This is part of a redevelopment effort by the Community Redevelopment Agency to
improve the city's waterfront. The project consisted of two specific elements: the extension of
Boynton Beach Boulevard from US1 to the Intracoastal Waterway and the construction of a
waterfront promenade designed to allow the public to experience the natural mangrove environment.
This project will act as the link between the private sector and public sector redevelopment activity
which has already commenced in this area. The improvements will also create a place that serves the recreational,
educational, social and economic needs of Boynton Beach as it reaches out to the region with a unique and captivating
design. Burkhardt Construction was awarded this project through a qualifications based selection
process.
Construction value: $8,839,819.00
Size: 2,000 feet of roadway and promenade
Project budget adherence: 15% below budget
Project schedule adherence: Completed 6 months ahead of schedule
South Pointe Streetscape Phase I - Miami Beach, FL
Customer and owner: City of Miami Beach
Current status: Completed 2002
Description: The award-winning South Pointe Streetscape Project was the first phase of
a capital improvements program for the world-renowned "South Beach" section of Miami
Beach. The project consisted of complete reconstruction of the storm drainage system,
sidewalks and a high level of finish streetscape/hardscape including an interactive
fountain, landscape, irrigation, color concrete sidewalks, brick pavers, street furniture
and an at grade street events plaza. The completion of the project was set to coincide
with the annual fall opening date for the venerable 94-year-old "Joe's Stone Crab
Restaurant" which is on the street. The project was completed 22 days ahead of schedule and on budget. Burkhardt
Construction was selected for this project through a qualifications based process. The construction value was then
negotiated with the Owner. This project earned Burkhardt Construction, Inc. a "Build
Florida" Award from the Associated General Contractors of America.
Construction value: $2,607,000.00
Size: 3,000 linear feet
Project budget adherence: Completed within budget
Project schedule adherence: Completed ahead of schedule
IllPagc
Question 8 Evidence of capabilities for construction scheduling, material procurement, and assurance
that plans, specifications. and schedules are met.
Current Builders employs leading-edge project
management services empowered by Building
Information Modeling (BIM) technology in conjunction
with dynamic scheduling and resource allocation
systems. For the Sunny Isles project Virtual Design &
Construction (VDC) services will commence during the
design phase, or any time prior to construction, and
continue through the entire construction process. VDC
services allow Current Builders to coordinate building
systems to an unprecedented degree and perform
analyses of system performance. VDC services give
Current Builders a unified system for managing time,
cost and design information to dramatically improve planning & construction efficiency. BIM technology is used to
harness the knowledge and experience of the project team to ensure constructability and explore design options.
Using BIM technology, Current Builders has been able to discover and prevent a wide range of coordination
errors prior to and during construction. On the Four-Forty Flagler Village project in downtown Ft. Lauderdale, FL,
BIM and was utilized to discover and resolve numerous problems with the structural column layout. Additionally,
mechanical shafts, elevator pits and machine rooms were able to be modified before construction began to
incorporate the exact equipment, thereby saving a large number of RFls and eventual change orders. All of the
constructability issues discovered using BIM were communicated and resolved with the collaboration of the
appropriate project team members. With full 3D visualization of coordination issues, BIM saved the project team
much of the time that would
traditionally be taken to
determine the proper action
and enabled the consideration
of downstream effects of the
various options considered.
As a result, the Four-Forty
Flagler Village project has
achieved a certificate of
occupancy nearly two months
ahead of schedule with a
fraction of total RFls in
comparison to similar projects
done prior to Current Builders'
use of BIM technology.
12 I P age
Question B Evidence of capabilities for construction scheduling, material procurement
and assurance that plans, specifications, and schedules are met.
<( '" Z ..I <{ Q. '" UJ
II ~ 0 Q. W II III 1: w
'" .. i= }: - ~ Dl W ::J 0 W ~
~
z I 0 '" '" 0 UJ ~ ~ 1: "
'" 0 w " N
.J U <( x ui <{ II II W '" UJ II <{
Cl U ll. X UJ II 0 0 ~ '" 0 i:i
.J Z ~ Cl x Z ~
ci ci }: <{ ll. J Cl ... w "
}: '" z j;: <( iii W
0 i= ci <( ::J ~ <{ ci x ... Cl ll.
II Z > it iii
m u Z :J .J 0 ! w II Q. Z UJ
Dl II
N N .J <{ .0 ~ 0 ci ..I <{ .0 0 ci ci ii Ui
<{ ... u U Dl W it 0:(
;. ;. UJ 0 :J 0:( ll. 0 W
<( <( Z Dl ;. II W ..I ";" .J .J ;. W on on u 1: UJ
}: }: b: ~ u - .J I- UJ UJ w
::J <( UJ UJ .J <
" :;: <{ I'l <{ <{ :;: x 0 0 0 Q.
iii l . UJ UJ ci .J ~ '" l- I- W '" '" z z <{
~ W ll. UJ < Ul UJ [ .. .. <{ b: u
;; i= Z }: z ~ I <{ <{ .J UJ
w 6 z - w
~ N ::i 0 !: 0
u " N ~ [ ~ m II
<{ ::i II i= Z UJ ~ m UJ <{
0 ::J
~ Dl ~ <( <{ 1:
z 0 '" 0 , u 0 ~
iii }: ': Z Z W
I I ::J !: ~
iii 0 UJ ::J 0
u W 0 0 UJ ~
z w u\ !: II ...
'" w 0 UJ l!l ui I c;;
I U i-- ~
I 0 Dl II W
0 II ::J W .J
U ll. II 0 ii
u\ Cl z 1
0 ::J I
0 f- ~
on W II
U <{
i= w
0 .J
Z U
il'
0
N 6
N
.. U
'" ..
... 0
il'
9
aI
-
U 6
iii :J
0 <l
0 0
III m
UJ
w
i=
.J
<l
U
W UJ
ll. w
UJ Q.
m <l
w U
1: UJ
UJ 0
z ~
b: 1:
w w
!: !:
UJ UJ
~
o
~
'"
-l!: c:
o :s
~ ..
"'c: ~
._ a:: Ql ~
c: c:..
Om ~ ~ E
~ .E ~ E
a:: L'l ::0 c7l
11:[
1-u
o Z~
([Z
<to
Ib
:i~
([~
:JZ
rnB
.a
\,J
13\Page
Question 9 Statement of experience summarizing projects constructed under a similar development
process.
~ Current Builders has completed in excess of 4000 parking spaces for both public and private Owners in
design-build, design-bid-build and CM @ Risk contracts. See section 7 for detailed information on
relevant projects.
~ Current Builders recently completed a very similar parking structure to the proposed garage where it
required us to build the structure while contiguous buildings were being built. We have developed a
unique forming system that does not require large staging areas thus allowing for work to commence
earlier on areas outside the building footprint such as the proposed park. See the attached preliminary
schedule under section 8.
~ Listed below under Our Approach you will note that we have selected a team that includes a park-
hardscape specialist. On a completed similar project, Current Builders was constructing a 585 space
garage while Burkhart was performing streetscape improvements as part of the master development in
Boynton Beach. Our recent success working together proves our teaming ability.
~ The vast historical data collected over many years enables us to provide value engineering to the Owners
selecting systems and material in collaboration with the design professionals that provide the most benefit
to the Owner.
Question 9 continued. What can the firm "bring to the table" for the benefit of the City of Sunny Isles
Beach.
~ Building Information Modeling: We are one of the few builders that have adopted this new 3D computer
generated modeling technology which limits change orders and RFl's while reducing construction time
periods which results in savings to the Owner. We have compiled comparative studies on the R.O.I using
B.I.M. and the results are impressive. They are so impressive we can cap costs associated with plan
coordination deficiencies.
~ In House Structural Capabilities: Of additional significance, the City of Sunny Isles will rely on the
selected builder to have a thorough understanding of the most critical part of the building Le. the
structure. Our team has significant experience through our in house CB Structures division where we can
self perform many of our structures. Having recently completed a nearly identical parking garage structure
we have the resources and knowledge to perform quickly and safely while creating cost savings to the
Owner by potentially keeping the structure in-house.
~ Our Management Team: Our team will be lead by William Blackledge who is a 25 year veteran at CB
and also is a Principal. William's large project experience includes notable projects such as the 45 million
dollar Marina Village mixed use project which included an 846 space design build garage. Aaron Buttress
will lead as CB's Project Manager and is a LEED AP. Aaron has managed four garages totaling over
1,655 spaces. He will lead a team with over eighty years experience in the construction industry. See the
organizational chart under section 5 for our other team members.
~ Our Approach: At the pre-submittal conference a question was asked Q# 9. At this point, it is a single
project, both phases, correct? A. Correct, obviously these two phases don't necessarily make the
perfect match, typically park builders are not parking garage builders. We agree with the answer
and have teamed with Burkhart Construction whose expertise is working with Municipal Owners on their
14 I P age
r
hardscape projects. Coupled with our expertise in garages we can focus on our respective strengths and
deliver it seamlessly. We have worked alongside Burkhart in the past with successful results.
~ Sustainability and Durability: We understand your desire to make the building as green as possible.
Our proposed project manager has recently completed a gold certified office building with a standalone
garage. Additionally all Current Builders project managers are required to be LEED certified to assist in
the green building process. Having completed three design-build garages of similar design we understand
the material choices and quality standards that will be required to protect a long term asset.
~ Quality Control: Current Builders Quality Control process dictates that every project has a unique
quality control plan based on internal guidelines, construction methodology and owner requirements. In
using the establish processes, the Quality Control manager creates a project specific quality control plan,
which includes project specific inspection checklists, frequency and type of testing required, as well as the
scheduling of third party consultants. In support of the site specific quality control plan, Current Builders
supervisory field staff is trained in the use of the software quality control program, with reports monitored
and reviewed by the Quality Control Manager.
~ Safety: Our safety culture has been recognized on the National, State and Local levels. Current Builders
is a founding partner in the Florida CHASE (Construction Health and Safety Excellence) program, a
partnership between OSHA, AGC and member contractors. We have been granted SHARP (Safety and
Health Achievement Recognition Program) status after a rigorous acceptance process. SHARP is an
OSHA partnership that recognizes employers who operate an exemplary safety and health management
system. Acceptance into SHARP by OSHA is an achievement of status that singled out Current Builders
among our business peers as a model for worksite safety and health. Current Builders is only one of a
handful of General Contractors in the Florida who have attained this status.
Question 10 A statement addressing the firms present and projected workload and how this project will
be scheduled within that workload.
~ Current Builders present value of construction is $103,000,000.00 with a backlog of 10,000,000.00. Our
surety credit limit with Travelers is in excess of $150,000,000.00 which indicates $140,000,000.00 of
surety credit available.
~ Our projected workload by midyear is expected to be $65,000,000 with a similar backlog which would
allow for $85,000,000.00 in additional capacity.
~ Our project staffing availability is very similar to our available surety credit meaning at the present time we
have a more than sufficient staff to handle this and other projects.
~ The proposed staff in the organizational chart exemplifies the excellent talent that has been assembled
for this project.
~ Excellent resources are available in the marketplace due to inactivity in the marketplace and we are
confident that our long term association with many of the vendors, suppliers and subcontractors that we
can assemble a highly competent team.
15 I P age
,a
NIELSON, ALTER & ASSOCIATES
April 1, 2009
JJ Rick Conner, Acting City Manager
~ CITY OF SUNNY ISLES, FLORIDA
uJ
::s 18070 Collins
'i: Sunny Isles, FL 33160
o
<(
!;;! RE: Principal: CB Constructors, Inc.
~ Project: Heritage Park and Parking Garage-City RFQ No. 09-03-01
1-
<(
~ Dear Conner:
iJ)
z
o
f=
:::J
.-J
o
iJ)
It has been a privilege of Travelers Casualty and Surety Company of AInerica ("Travelers")
to provide surety bonds CB Constructors, Inc. During that time they have built and we
have bonded projects in the $85,000,000 to $150,000,000 range for a wide variety of
~ owners.
w
~
:::J
iJ)
u It is our opinion that CB Constructors, Inc. is qualified to perform the above captioned
z project. At their request we will give favorable consideration to providing the required
~- performance and payn1ent bonds.
;t
2:
o
u
o(j
z
o
iJ)
.-J
W
Z
W
>
B If you have any questions or need any additional information. please do not hesitate to
It' contact our office.
LL
w
2:i
w
2:
f=
u
z
iJ)
Please note that the decision to issue performance and payn1ent bonds is a matter between
CB Constructors, Inc. and Travelers, and will be subject to our standard underwriting at
the time of the final bond request, which will include but not be limited to the acceptability
of the contract documents, bond forms and financing. We assume no liability to third
parties or to you if for any reason we do not execute said bonds.
Sincerely,
~Cl~orneY-in Fact
2: ~:Z~'LERS CASUALTY AND SURETY COMPANY OF AMERICA
o
~
CL
2:
o
u
Z
:::J
I-'
~
<(
2:
iJ)
/
Travelers is an A+ (Superior) A.M. Best rated insurance company (Financial Size Category XV $2 billion or
more)
8000 Governors Square Boulevard
Suite 101
Miami Lakes, FL 33016
P: 305.722.2663
F: 305.558.9650
www nielsonbondscom
r AC, 3964713
1
STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
CONSTRUCTION INDUSTRY LICENSING BOARD
SEQ# Loa083100421
. LICENSE NBR.'
08 31 2008 088024565 CGC1SOB703
The GENERAL CONTRACTOR
Named below IS CERTIFIED
Under the provisions of Chapte~ 489 FS.
Expiration date: AUG 31, 2010
REID, CHARLES P
CB CONSTRUCTORS INC
2251 BLOUNT RD
POMPANO BEACH FL 33069~5114
CHARLIE CRIST
GOVERNOR
CHARLES W. DRAGO
SECRETARY
DISPLA vAs REQUIRED BY LAW
ACORD. CERTIFICATE OF LIABILITY INSURANCE CSR TL I DATE (MMIDDIVYYV)
CURRE-2 11/14/08
PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
W.S. Pharr & Company HOLDER. THIS CERTIFICATE DOES NOT AMEND. EXTEND OR
.0. Box 725269 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
.tlanta GA 31139
Phone: 770-434-8440 Fax:770-434-0146 INSURERS AFFORDING COVERAGE NAIC#
INSURED INSURER A: Colony Insurance Company
INSURER B:
CB Constructors Inc INSURER C:
2251 Bount Road INSURER 0:
pompano Beach FL 33069 INSURER E:
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
LTR NSR[ TYPE OF INSURANCE POLICY NUMBER DATE IMMIDDIYYI DATE'IMI"ID~ LIMITS
GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000
-
A ~ COMMERCIAL GENERAL LIABILITY AR4360226-1 11/15/08 11/15/09 PREMISES lEa occurence) $ SO, 000
h CLAIMS MADE ~ OCCUR MED EXP (Anyone person) $
PERSONAL & ADV INJURY $1,000,000
-
GENERAL AGGREGATE $ 2, 000, 000
f---
GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $2,000,000
-'In PRO- . h Emt:> Ben. 1,000,000
POLICY JECT LOC
AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT
- $
ANY AUTO (Ea accident)
-
- ALL OWNED AUTOS BODILY INJURY
(Per person) $
SCHEDULED AUTOS
-
HIRED AUTOS BODILY INJURY
- $
NON-OWNED AUTOS (Per accident)
-
- PROPERTY DAMAGE $
(Per accident)
GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $
==l ANY AUTO OTHER THAN EA ACC $
AUTO ONLY: AGG $
EXCESSIUMBRELLA LIABILITY EACH OCCURRENCE $
tJ OCCUR o CLAIMS MADE AGGREGATE $
$
R DEDUCTIBLE $
RETENTION $ $
WORKERS COMPENSATION AND 1r0RY LIMITS I IO~R-
EMPLOYERS' LIABILITY
MN PROPRIETORIPARTNERIEXECUTIVE E.L EACH ACCIDENT $
OFFICER/MEMBER EXCLUDED? E.L. DISEASE - EA EMPLOYEE $
~~~M'l:'~~~vfs~6~s below E.L. DISEASE - POLICY LIMIT $
OTHER
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
CERTIFICATE HOLDER CANCELLATION
FORINO 2 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAlL ~
COVERAGES
FOR INFORMATION PURPOSES ONLY
@ ACORD CORPORATION 1988
ACORD 25 (2001/08)
ACORD... CERTIFICATE OF LIABILITY INSURANCE DATE (MMIDDIYYVYl
1:03/2008
'~ODUCER (954)943-5050 FAX: (954)943-SU7 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
....rank H. Furman, :rnc. HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
1314 Bast Atlantic Elvd. ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
P. O. Box 1927
PODII)ano Eeach FL 33061 INSURERS AFFORDING COVERAGE NAlC#
INSURED INSURERA:Continental Casual tv 20443
CB Constructors, Inc. INSURERB:Briclaefielcl BmPlovers 10701
2251 Blount Road INSURERc:.American Cas Co Reaclina 20427
INSURER D:
Pompano Beach FL 33069 INSURER E:
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD ItlDICATED. NOTWITHSTANDING ANY
REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,
THE INSURANC~~OROED BY THE POLICIES DESCRIBED HER~I.~_IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POUCIES.
~ I~~ TYPE OF INSURANCE POUCY NUMBER POLICY EFFECTIVE PO~fl,~~ UMITS
~ UABIUTY !
COMMERCIAL GENERAL LIABtLITY DAMAGE TO REN'IED $
I CLAIMS MADE 0 OCCUR MED EXP $
- $
$
~LAGG~nELIMIT AnS PER: _ "''''''''U"OO ."'''' $
I POLICY ~,Q;: LOC
A ~OMOBILE LIABILITY 2075174391 11/15/2008 11/15/2009 COMBINED SINGLE LIMIT 1,000,000
(Ea accklenl) $
~ ANY AUTO
~ ALL OWNED AUTOS BODILY INJURY $
(Pili peraon)
~ SCHEDULED AUTOS
~ HIRED AUTOS BODILY INJURY $
..!. NON-<lWNED AUTOS (Par accidenl)
PROPERlY DAMAGE $
(Per accident)
RRAGE UABILITY AUTO ONLY - EA ACCIDENT $
ANY AUTO OTHER THAN ~. .--
AUTO ONLY: Ar>r.. $
aESSIUMBRELLA UABILlTY !
OCCUR 0 ClAIMS MADE !
R DEDUCTIBLE ~ $
S
s
B WORKERS COMPENSATION AND 083037079 11/15/2008 11/15/2009 ~ 19W"
EMPLOYERS' LIAIIIUTY
AN'( PROPRIETOR/PAATNERlEXECUTIVE E.L. EADI AC:CIOENT S 1,000,000
OFFICERlMEMBER EXCLUDED? E.l. 0"""'....... - EA EMPLOYEE $ 1,000,000
~,;,~~nder ., .L. nl~"'''''' -."." I"" I IUIT $ 1,000,000
C OnaR Leased/Rented 2075174357 11/15/2008 11/15/2009 Maxi_ Lo.. Amoun~ $750,000
Equipment Dedu,,~ible $2,500
DESCRIPTION OF OPERATIONSlLOCATlONSlVEHICLESIEXCLUSlONS ADDED BY ENDORSEMENTISPEClAL PROVISIONS
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
npor Bidding purposes Only" EXPIRATION DATE THEREOF. THE ISSUING INSURER WILL ENDEAVOR TO MAlL
~ DAYS WRmEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT
FAILURE TO DO SO SHALL IMPOSE NO OBUGAnDN OR UA8lLlTY OF ANY KINO UPON THE
INSURER-ITS AGENTS OR REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE '?-.# .;)-~.__.-.J-.
Frank Furman, Jr/JC
CERTIFICATE HOLDER
CANCELLATION
ACORD 25 (2001/08)
INS025 (0108).088
@ ACORD CORPORATION 1988
Page 1 of 2
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY
PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted
to City of Sunny Isles Beach
by Charles P. Reid
for CB Constructors, Inc.
whose business address is
2251 Blount Road
Pompano Beach, Fl 33069
and (if applicable) its Federal Employer Identification Number (FEIN)
06-1730927
(If the entity had no FEIN, include the Social Security Number of the individual signing this
sworn statement:
2. I understand that a "public entity crime" as defIned in Paragraph 287. 133(l)(g), Florida
Statutes, means a violation of any state or federal law by a person with respect to and directly
related to the transaction of business with any public entity or with an agency or political
subdivision of any other state or of the United States, including, but not limited to, any bid or
contract for goods or services to be provided to any public entity or an agency or political
subdivision of any other state or of the United States and involving antitrust, fraud, theft,
bribery, collusion, racketeering, conspiracy, or material misrepresentation.
3. I understand that "convicted" or "conviction" as defined in Paragraph 287 . 133 (l)(b ), Florida
Statutes means a finding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial court of record relating to charges brought by
indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry
of a plea of guilty or nolo contenders.
4. I understand that an "affIliate" as defined in Paragraph 287. 133(1)(a), Florida Statutes, means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the management of the
entity and who has been convicted of a public entity come. The term "affiliate" includes
those officers, directors, executives, partners, shareholders, employees, members, and
agents who are active in the management of an affiliate. The ownership by one person of
shares constituting a controlling interest in another person, or a pooling of equipment or
income among persons when not for fair market value under an arm's length agreemeilt,
shall be a prima facie case that one person controls another person. A person who
knowingly enters into a joint venture with a person who has been convicted of a public
entity crime in Florida during the preceding 36 months shall be considered an affiliate.
15
5. I understand that a "person" as defmed in Paragraph 287. 133(1)(e), Florida Statutes, means any
natural person or entity organized under the laws of any state or of the United States with the
legal power to enter into a binding contract and which bids or applies to bid on contracts for
the provision of goods or services let by a public entity, or which otherwise transacts or applies
to transact business with a public entity. The term "person" includes those officers, directors,
executives, partners, shareholders, employees, members, and agents who are active in
management of any entity.
6. Based on information and belief, the statement which I have marked below is true in a
relation to the entity submitting this swomstatement. (please indicate which one (1) of the
following three (3) statements is applicable.)
~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors,
executives, partners, shareholders, employees, members, or, agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of a
public entity crime within the past 36 months.
(2) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of a
public entity crime within the past 36 months.
(3) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or agents who are active in management of the entity, or any affiliate
of the entity has been charged with and convicted of a public entity crime within the past 36
months. However, there has been a subsequent proceeding before a Hearing Officers of the State
of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer
determined that it was not in the public interest to place the entity submitting this sworn
statement on the convicted vendor list. (Attached is a copy of the final order.)
I UNDERST AND THAT THE SUBMISSION - OF THIS FORM TO THE CONTRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS
FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH
DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE
PERIOD OF THE CONTRACT ENTERED INTO , WHICHEVER PERIOD IS LONGER. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTTIY
PRIOR TO ENTERING INTO A CONfRACT IN EXCESS OF THE THRESHOLD AMOUNT
PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE CATEGORY TWO OF
ANY ~~ IN ~~ON CONTAINED IN THIS FORM.
~~ Charles P. Reid - CEO
(Printed or Typed Legal Name of Mfiant)
SIGNATURE OF AFFIANT
17
State of Florida of County of Miami-Dadel /
Sworn to and subscribed before me this '7 day of frfJiA' c
. 2009 by
C r\c~ ~\( -J
")
\,
-f<c,,'ld
---._~ -- ,
--\ /"- ~
X,
~
_ ....J
RtT~ f()GUO
r~ M'{ COMMISSION * 00 750017
',lil "'''P\~ES~ Maroh 4, 20~ 2 .
~ 1l\lII MotaIY pu\ll\C unQelWlil8lS
Notary Seal:
Notary's Name Printed, Stamped or Typed
l/
Personally Known:
orPToducedIdentification
Identification Produced
18
NON-COUUSlVE AFFIDA VIT
State of
Florida)
County of
Miami-Dade)
Charles P. Reid
and says that:
being first duly sworn, deposes
(1) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully informed respecting the preparation and contents of the attached Bid and
of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded, conspired,
connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a
collusive or sham Bid in connection with the Work for which the attached Bid has been
submitted; or to refrain from bidding in connection with such Work; or have in any manner,
directly or indirectly, sought by agreement or collusion, or communication, or conference with
any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or
to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder,
or to secure through any collusion, conspiracy, connivance, or unlawful agreement any
advantage against the City of Sunny Isles Beach, Florida, or any person interested in the
proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any
other of its agents, representatives, owners, employees or parties in interest, including this
AffI~.,.) /..::? ~'
~-' Charles P. Reid - CEO
SIGNATURE OF AFFIANT
(Printed or Typed Legal Name of Affiant)
20
~
;11
~~$,"7..::}~~~~~~;f~
.:?'$L,,": ~',~" ~~;<i"''''''t~~.,~..."" ~-4;.~~1'''
.:r.~ ;;~"'~: _-: ':. ';-i':""~-~";:<~)~iJ:lf
" ",'".' -", ,11
, I"., "1"\ ~. .:\"4';,~~
,',=, - ". '.' '.' " .:,,', ",. ", ."""':~~
cb 1 c~rre~~ ;~uild,ers
Professional Construction Services
RFQ #09-03-01
Heritage Park and Parking Garage
Presented to:
City of Sunny Isles Beach
ED
APR 0 8 2009
Clty ot Sunny Isle. Beach
Office ot the CI Clerk
cb
current builders
DlSllOlfive BuilOIl1(Js lJislmctivti P>:opie.
April 8, 2009
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FI 33160
Re: RFQ No. 09-03-01, Professional Construction Services for Heritage Park and Parking Garage, Letter
of Interest
Attn: Rick Conner, City Manager
First, we would like to thank you and the City of Sunny Isles Beach for the opportunity to submit
our qualifications for your consideration. Second, why should you invite Current Builders to the second
phase? There are a number of relevant reasons that I would like you to consider that are discussed in
further detail within our submittal as follows.
~ Our Approach to the Project: Within our submittal we took a team approach to the uniquely
different projects of the garage and park combining our garage building expertise with a firm who
has significant park experience and with whom we have worked with previously.
~ Building Information Modeling also known as B.I.M: This new three dimensional plan
coordination tool also known as Virtual Design and Construction has been adopted by Current
Builders and recently used on a similar Design/Build garage with great success speeding the
construction timeframe while reducing change orders.
~ Competitive Costs: A unique capability of Current Builders is our ability to self perform concrete
structures which make up 35-40% of the project cost. This is accomplished with our CB
Structures group.
~ The Partners: Each project is assigned what we call a P.I.C., otherwise known as a principle in
charge. The Owners, Design team and project team are always dealing with a partner that can
make decisions quickly and responsibly.
~ Our Culture: The industry is slowly moving away from the "silo" mentality where Owners,
Architects and Contractors think and work independently in their respective silos to more
integration and collaboration. We support this. Each of our projects start with a third party
facilitator to teach team building to the project team enabling better collaboration between all
parties and creates a partnering mentality.
We sincerely hope that we will have the opportunity to provide a proposal in phase two so we can
show the committee how we can provide very competitive pricing without sacrificing quality, safety and
collaboration through our adoption of the newest leading technology.
Finally, the selection of a CM/GC comes down to your confidence that the firm can perform to the
required level that is required and if they give you the level of personal service you deserve. We have a
proven record for over 35 years managing successful projects and relationships, as we know each project
is unique and demands a new commitment to success. This commitment begins with our submittal of
qualifications.
(,">?~ours~
Charles P. Reid
CEO
CB Constructors, Inc.
2JPage
cb
current builders
m~tmCl1ve Butfomos Dlstmct/vl' Peoplp.
Question 1 History of the Firm
~ Current Builders started in 1972 as a General Contractor specializing in structural concrete
structures as a subsidiary of Gulfstream Land and Development.
~ In 1973 two present shareholders join the firm.
~ In 1976 the present CEO joins the firm.
~ In 1976 Current Builders started doing work as an open shop general contractor on the east and
west coast of Florida
~ Four principles in the firm have spent their whole career at Current Builders spanning over 130
years with the firm.
~ In 1981 Current Builders is awarded its first public project for Broward Community Center to
construct a library. The project was awarded the Governors Design and Construction award.
~ Current Builders ranked #287 in 1982 on ENR top 400 US Contractors
~ In 1985 Current Builders separates from its parent company and becomes a private company
~ In 1988 Current Builders aligns with Travelers, the nation's largest surety to provide bonding and
we remain with them today.
~ In 1993 Current Builders does its first design build project for Edy's Grand Ice Cream, a storage
and distribution facility in Weston
~ Current Builders opens a branch office in Naples/Ft Myers in 1997 to better serve its clients that
work on the west coast
~ Current Builders opened a branch office in Orlando in 2002 and relocated the office to Tampa in
2005.
~ Current Builders University is created in 2003 as a vehicle to provide continuing education for our
employees and a 100 person classroom is constructed at the Pompano headquarters
~ In 2004 Current Builders was awarded two design build garages using a nearly identical framing
system as the Sunny Isles garage.
~ The South Florida Business Journal awarded Current Builders the Business of the Year in 2005
~ In 2006 Current Builders receives the S.H.A.R.P safety award and is one of only five contractors
in the state to receive this award.
Question 1 Ownership, key management and time at Current Builders
~ CEO Charles P Reid - 34 years
~ President Michael Taylor - 27 years
~ CFO Rick Colandreo C.P.A - 13 years
~ COO Charlene Faber - 27 years
~ Senior Vice President Richard Carr - 36 years
~ Senior Vice President Hank Huisman - 37 years
~ Senior Vice President Robert Schnurman - 17 years
~ Vice President William Blackledge - 25 years
3lPage
cb
current builders
Distlncti,e BUildings. Distinctive People
Question 1 Key Management
~ Chip Angenendt - Vice President Tampa - 4 years
~ Elizabeth Leng - Human Resources Director - 7 years
~ John Cline - Director of Risk Management and Quality Control - 34 years
~ Jorge Costas - Vice President Marketing - 7 years
~ Rolf Severtson - Vice President Structures - 5 years
Question 2 A summary of any company changes that are anticipated to occur during the project
~ We do not anticipate nor have scheduled any management changes within the timelines of this
project.
Question 3 Location of corporate headquarters and other divisional offices.
~ Corporate office: Pompano Beach, Florida
~ Branch offices: Naples, Tampa
Question 4 Location of office(s) that will be involved in the project during pre-construction and
potential construction phase services.
~ The corporate office in Pompano Beach will provide all estimating, preconstruction and
construction services.
~ CB Structures, the structural division of Current Builders operates from the Pompano Beach
corporate office.
4lPage
cb
current builders
Dlstmctive Buildings DIstinctive People
Question 5 Description of contractor's project team to include the name, responsibilities and resumes of
key personnel that will be assigned to this Project.
William Blackledge - Principal in Charge: Results driven professional with over 25 years experience in
the management of large scale survey and engineering construction projects. History of directing projects
through all phases from initial conception to final closeout. Cost conscious with track record in developing
new construction concepts to control costs, enhance efficiency, and improve productivity. Planned and
executed strategy which led to the successful completion of projects ahead of forecasts. William is a
diligent leader with solid business planning, and problem solving skills. Skilled negotiator and
communicator; particularly with owners, architects, engineers and building officials.
Licensures/Education/Affiliations: Broward Community College. Associated General Contractors Project Managers
Course. Member of the AGC of South Florida. OSHA Jobsite Safety Certification (30 Hour)
Major Projects:
Boca Colonnade Phase II
4 story Class "A" Office Bldg
4 story 477 parking space garage
Boca Raton, FI- $15,000,000.00
Marina Village
349 High end residential units
6 story - 846 parking space cast in place garage
Boynton Beach, FI - $49,000,000.00
Boca Grand
164 luxury units
5 level parking garage with 391 spaces
Boca Raton, FI - $24,000,000.00
Riviera Yacht and Beach Club
212 residential units and health club
parking structure
Hallandale, FI - $23,100,000.00
Aaron Buttress - Project Manager - LEED, AP - Aaron has over eight years of experience in the
management of large scale construction projects. Aaron posses a diverse knowledge in construction
methods in both business park development and residential projects including structural steel, cast in
place concrete and precast concrete structures. History shows a proven track record of coordinating
projects with adverse conditions. Aaron also specializes in multi-level parking garage development.
Licensures/Education/Affiliations: University of Florida Bachelor of Building Construction. LEED Certified AP . OSHA
Jobsite Safety Certification (30 Hour)
Major Projects:
Boca Colonnade Phase II
4 story Class "A" Office Bldg
4 story 477 parking space garage
Boca Raton, FI - $15,000,000.00
Block 69 Parking Garage
5 story parking garage with 202 spaces
Delray Beach, FI $15,000,000.00
Boca Grand
164 luxury units
5 level parking garage with 391 spaces
Boca Raton, FI - $24,000,000.00
The Moorings at Lantana
378 residential units
6 story design build parking garage with 585 spaces
Lantana, FI - $50,000,000.00
5lPage
cb
current builders
Dis/inctlve Bui/dings. D/s/mcllvP People
Question 5 Description of contractor's project team to include the name, responsibilities and resumes of
key personnel that will be assigned to this Project.
d..
Ken Walker - Project Superintendent - Ken has over 30 years experience in the management of
various types of construction. He started his career on one of the first nine story condominium projects
in Naples, Florida. Since that time he has advanced in the construction industry to varied positions of
supervision and responsibility. Ken has a histy of directing projects through all phases from initial
conception to final closeout. He is adept at design scopes of work in order to assure proper coverage
and in managing multiple projects simultaneously.
Licensures/Education/Affiliations: OSHA Jobsite Certification (10 hour and 30 hour) . Class B General Contracting
License. Management Training. Carpentry Journeyman Training
Major Projects:
440 Flagler Village
218 high end residential units
5 story 366 parking space garage
Ft Lauderdale, FI - $44,400,000.00
Seaside at Key West
96 Luxury Townhome Units
Key West, FI- $20,528,132.00
Belmont Place
Wood frame residential units
Complex 4 story split garden style apartments
Marietta, GA - $25,000,000.00
Dave Talbert - Senior Superintendent Structures - Dave is a result driven professional with 22 year
I tenure at Current Builders and experience in small and large-scale construction projects. Dave has a
history of directing projects through all phases. Dave is a diligent leader with a extensive working
I knowledge of building codes and regulations including OSHA. He is very adept in managing general
building trades and technical elements of architectural maintenance and construction and especially
proficient in building layout and concrete formwork of all types.
Licensures/Education/Affiliations: Broward Community College (Civil Engineering Program). AGC Supervisory
Training Program. OSHA Jobsite Safety Certification (10 hour and 30 Hour)
Major Projects:
440 Flagler Village
218 high end residential units
5 story 366 parking space garage
Ft Lauderdale, FI - $44,400,000.00
Block 69 Parking Garage
5 story parking garage with 202 spaces
Delray Beach, FI $15,000,000.00
Marina Village
349 High end residential units
6 story - 846 parking space cast in place garage
Boynton Beach, FI - $49,000,000.00
Moorings at Lantana
378 residential units
6 story design build parking garage with 585 spaces
Lantana, FI - $50,000,000.00
61Page
BURKHARDT
CONSTRUCTION, INC.
Question 5 Description of contractor's project team to include the name, responsibilities and resumes of
key personnel that will be assigned to this Project.
Vincent G. Burkhardt - President: Vince Burkhardt is the founder and President of Burkhardt
Construction, Inc. He has over 34 years experience serving as project principal and assumes direct and
ultimate responsibility for all construction projects. Vince is responsible for all corporate and
construction administration.
Professional Credentials
. Bachelor of Science in Building Construction, University of Florida, 1972.
. Associate of Arts degree, Palm Beach Junior College, 1970.
· Continuing Education
Numerous industry related seminars for professional improvement and license renewals.
. Certified General Contractor, State of Florida, CGC003711
Major Proiects:
. 6th Avenue South Streetscape Improvements, 2007, Lake Worth CRA
Construction Value: $8,265,674.00
. Hollywood Beach Boardwalk & Surf Road utility Improvements, on-going, Hollywood Beach CRA
Estimated Construction Value: $25,000,000.00
. Boynton Beach Boulevard Extension and Promenade, 2006, Boynton Beach CRA
Construction Value: $8,839,819.00
. South Second Street Streetscape, 2004, City of Fort Pierce
Construction value: $987,000.00
Dennis Haynes - Vice President. He has over 35 years experience in the construction industry, serving
the last 17 years as chief project manager of the horizontal and streetscape construction at Burkhardt
Construction. He has directly overseen construction projects ranging from $250,000 to over $20 million.
He has successfully worked with many municipalities throughout Florida, resulting in successful
streetscape and park projects as well as repeat business relationships
Professional Credentials
· Palm Beach Junior College, Lake Worth, Florida.
. Allstate Construction College, Fort Lauderdale, Florida.
. Certified General Contractor, State of Florida, CGC007105
Major Projects:
. Ruby Avenue, Monument Avenue, Dakin Avenue and Sproule Street Design/Build
Streetscapes, On-going, Kissimmee, FL
Estimated construction value: $4,000,000.00
. Barton Boulevard Design-Build Streetscape, On-going, Rockledge, FL
Estimated construction value: $7,271,000.00
. Ocean Drive & Beachland Boulevard Intersection Improvements, 2005, City of Vero Beach
Construction Value: $167,125.00
. Avenue A Streetscape, 2005, City of Fort Pierce
Construction value: $508,912.00
7lPage
cb
current builders
f)/slinr:llve BUildings Distinctive People
Question 6 Describe how contractors' team will be organized and assigned responsibility for this
Project.
William Blackledge-Principle in Charge
Aaron Buttress - Project Manager, LEED,
AP
.8Jl. tc
President -
Burkhardt Const.
e.."!1'Il
Rol' e on
VP of Structures
enior
Superintendent -
Structures
V. President -
Burkhardt Const.
8\Page
cb
current builders
O1slinclive BUIldings Di'ilmclive People
Question 7 Description of recent project experience, including projects of similar size, and client references
with contact information.
Block 69 Parking Garage
"... In addition to building a quality project, the involvement
by the management and principals brought the project
success in both time and budget. This was a complex, city
center project involving below grade water issues,
construction within 2 inches of adjoining residential
structures, as well as traffic and pedestrian issues. They
were truly a team player and worked with our staff in
overcoming any and all obstacles."
Bruce Jarvis - President
The Bruce Group
(Owners Rep)
561-330-9106
Boca Colonnade Parking Garage
"....The entire project included involvement by the principals
and senior staff, which were instrumental to bringing the
project in on budget and in a timely manner. Their ability to
work with our people as team players was a key to the
successful delivery of the project. I have enjoyed working
with Current Builders on several past projects and will bring
them in to work together in the future."
George Ledwith V P of Development
Liberty Property LP
561-999-0310
Description: 202 parking spaces - parking for the City of Delray Beach
Original Contract: $7,128,172.00 Final Contract: $7,445,172.00
Final Completion: 2007 Construction Services: Negotiated GC
Owner: Block 77 Development Architect: Perez Design
Description: 4 level, 477 parking space garage-tilt wall construction
Original Contract: $14,556,722.00 Final Contract: $14,589,330.00 ..
.. contract was inclusive of garage and office building
Final Completion: 2008 Construction Services: CM @ Risk/GMP
Owner: Liberty Property LP Architect: RLC Architects
9lPage
cb
current builders
Distinctive Buildings. OIslmctive People
Question 7 Description of recent project experience, including projects of similar size, and client references
with contact information.
Radius Parking Garage
"This project consisted of a 15 story condominium with 304
high end units, and a seven-story, 752 parking space,
poured in place garage. This project was located in a
downtown urban area of Hollywood, Florida. This project
was successfully built, with team efforts from the contractor,
owner, and design team. Current Builders contribution to
this project was greatly appreciated and we look forward to
working together in the future."
Stacey Wyatt
Hollywood Young Circle LP
770-231-6023
440 Flagler Village Parking Garage
".....Everyone in our firm has enjoyed working with Current
Builders. The construction of complex buildings such as
these in a manner satisfactory to both the owner and
contractor mandates a universal bias for teamwork and the
thoughtful balance of everyone's priorities. We have found
Current to be an invaluable contributor to the success of our
project and we look forward to working with them on many
future buildings."
Greg West Sr Vice President
Zom Florida, Inc.
954-779-7950
~
~J"-f 1
'l::::,
lit"
II '; <::l>'"I. 0....
-, ~ "r~
1I11'~~ "I t
'I III I
III III III !
,ii i.~~
J
= ~:-
l_
~ ..
"!!~
,..
-
Description: 752 space parking garage
Original Contract Amount: $7,992,380.00 Final Contract Amount: $9,410,606.00
Owner: Hollywood Young Circle, LP Architect: MSA Architects, Inc.
Final Completion: 2007 Construction Services: Negotiated GC
lr
~
po
I
-I
Description: 366 parking space garage enclosed by a wrap around building
Original Contract Amount: $5,700,000.00 Final Contract Amount: $5,700,000.00
Owner: Zom Florida, Inc. Architect: Horton Harley & Carter
Final Completion: 2009 Construction Services: Design Build
lOIPage
BURKHARDT
CONSTRUCTION, INC.
Question 7 Description of recent project experience, including projects of similar size, and client
references with contact information.
Boynton Beach Boulevard Extension and Promenade - Boynton Beach, FL
Customer and owner: City of Boynton Beach CRA
Current status: Completed 2006
Description: Burkhardt Construction served the City of Boynton Beach CRA for construction of a
streetscape project along the Intracoastal Waterway involving the extension of Boynton Beach
Boulevard. This is part of a redevelopment effort by the Community Redevelopment Agency to
improve the city's waterfront. The project consisted of two specific elements: the extension of
Boynton Beach Boulevard from US1 to the Intracoastal Waterway and the construction of a
waterfront promenade designed to allow the public to experience the natural mangrove environment.
This project will act as the link between the private sector and public sector redevelopment activity
which has already commenced in this area. The improvements will also create a place that serves the recreational,
educational, social and economic needs of Boynton Beach as it reaches out to the region with a unique and captivating
design. Burkhardt Construction was awarded this project through a qualifications based selection
process.
Construction value: $8,839,819.00
Size: 2,000 feet of roadway and promenade
Project budget adherence: 15% below budget
Project schedule adherence: Completed 6 months ahead of schedule
South Pointe Streetscape Phase 1- Miami Beach, FL
Customer and owner: City of Miami Beach
Current status: Completed 2002
Description: The award-winning South Pointe Streetscape Project was the first phase of
a capital improvements program for the world-renowned "South Beach" section of Miami
Beach. The project consisted of complete reconstruction of the storm drainage system,
sidewalks and a high level of finish streetscape/hardscape including an interactive
fountain, landscape, irrigation, color concrete sidewalks, brick pavers, street furniture
and an at grade street events plaza. The completion of the project was set to coincide
with the annual fall opening date for the venerable 94-year-old "Joe's Stone Crab
Restaurant" which is on the street. The project was completed 22 days ahead of schedule and on budget. Burkhardt
Construction was selected for this project through a qualifications based process. The construction value was then
negotiated with the Owner. This project earned Burkhardt Construction, Inc. a "Build
Florida" Award from the Associated General Contractors of America.
~ ,". ,.~~ .,
~~~._,
",.' ~.'
-. . j " ..... . "" (
~ I'. -'~'.- '- ,." '-,1 .,' ".' ,,'j
_:.- -""ki.:-,,-_~_ ~ _.~~, U
....~ . - , , .~;:,,~.
!:" "'" .:0;.'_4"
~
Construction value: $2,607,000.00
Size: 3,000 linear feet
Project budget adherence: Completed within budget
Project schedule adherence: Completed ahead of schedule
IllPage
cb
current builders
Distinctive Buildmgs ['istmetive People
Question 8 Evidence of capabilities for construction scheduling, material procurement, and assurance
that plans, specifications, and schedules are met.
Current Builders employs leading-edge project
management services empowered by Building
Information Modeling (BIM) technology in conjunction
with dynamic scheduling and resource allocation
systems. For the Sunny Isles project Virtual Design &
Construction (VDC) services will commence during the
design phase, or any time prior to construction, and
continue through the entire construction process. VDC
services allow Current Builders to coordinate building
systems to an unprecedented degree and perform
analyses of system performance. VDC services give
Current Builders a unified system for managing time,
cost and design information to dramatically improve planning & construction efficiency. BIM technology is used to
harness the knowledge and experience of the project team to ensure constructability and explore design options.
Using BIM technology, Current Builders has been able to discover and prevent a wide range of coordination
errors prior to and during construction. On the Four-Forty Flagler Village project in downtown Ft. Lauderdale, FL,
BIM and was utilized to discover and resolve numerous problems with the structural column layout. Additionally,
mechanical shafts, elevator pits and machine rooms were able to be modified before construction began to
incorporate the exact equipment, thereby saving a large number of RFls and eventual change orders. All of the
constructability issues discovered using BIM were communicated and resolved with the collaboration of the
appropriate project team members. With full 3D visualization of coordination issues, BIM saved the project team
much of the time that would
traditionally be taken to
determine the proper action
and enabled the consideration
of downstream effects of the
various options considered.
As a result, the Four-Forty
Flagler Village project has
achieved a certificate of
occupancy nearly two months
ahead of schedule with a
fraction of total RFls in
comparison to similar projects
done prior to Current Builders'
use of BIM technology.
12 I P age
Question 8 Evidence of capabilities for construction scheduling, material procurement,
and assurance that plans, specifications, and schedules are met.
.
"
'"
z
'"
CJ
o-
m
1\I
;.
.
I
'"
~
~
I
o
tJ
Ii
Z .J
o ~ _
Eo"
.J U ~
~ ~ L
8 ~ Ii
.J ~-.o
~ UI 0
t;: ~- ~
UI -I
II It OJ t X
:J 0 w
UI IJ ~ I
II W ~ U1. ~
~ ~ WoX' ~: ~
~ ii II : ~
~~.oOIi
a. 0 II
::: -.J ;. ~'.n
~ ~ ~ X: 0
~ ~ [ jl
UI
w
5
<l
U
W
CJ a.
z UI
ii: Ui
<( w
tJ I UI
~- UI ~
Z Z <(
<( i: tJ
.J W ~-
n ~ ~
~ ~
<(
w
OJ w
UI ~ "
Z II 0
I CJ' ~
:J Z ~
5 0 ~
tJ OJ Ii
LIJ 5 ";'
-~ UI ~
-{ '<1- i.
Z ~-.~
I
~
~
..
I
UI
~
<(
"
:J
~
U
:J
"
- ~'
UI
~ ci
g 6
i= ~
:J <(
o ..,
Z
:J
o
II
CJ
II
W
o
Z
:J
OJ
1\I
;.
.
I
"
"
o
~
'"
!:
UI
Ii
.0
o
0:--
~
<l
Ul
- '"
;:
;;
;:
u
<(
~
z
'"
I
'"
u
Z
'"
I
I
o
tJ
lJ>
o
,n
1- ..,
W
N
::;
OJ
o
I
a
w
w
tJ
o
II
a.
o
I-
W
tJ
i=
o
z
" '
"
o
~
'"
~
iii
lJ>
o
[..
w
!:
UI
OJ
:J
II
CJ
'<l
II
<l
w
...J
tJ
~ ;g
<;
<C
~
~
:J
<l
lJ>
o
N 6
1\I
m U
'" '"
lo. 0
lJ>
9
_ OJ
u 0
'" :J
o <( I
o 01
on OJ I
I
UI
w
i=
.J
:!
tJ
W UI
a. w
UI a.
in <(
W tJ
I UI
UI 0
Z ~
i: I
w w
!: !:
UI Ul
-l!:
o
;:
0>
-l!: .E
o .E
;: '"
~g>~Q)~
;: 'e: 0: c: '"
'0; -.~_ ~ E
E 'E' .!!! E
~ Ll ~ c.i5
~I:[
~U
oZ
a:z
<1:2
IU
~~
a:~
:JZ
mB
tIl
\,.. ~
Q)g
::Q~
.- '--'
::>~
.Des
v,
t:>.
.&..d~
C~
Q)~
\,..t3
\,..g
::>cS
v
.0
\I
13JPage
.~
cb
current builders
Distinctive Buildmgs DlstlflctlVe People
Question 9 Statement of experience summarizing projects constructed under a similar development
process.
~ Current Builders has completed in excess of 4000 parking spaces for both pUblic and private Owners in
design-build, design-bid-build and CM @ Risk contracts. See section 7 for detailed information on
relevant projects.
~ Current Builders recently completed a very similar parking structure to the proposed garage where it
required us to build the structure while contiguous buildings were being built. We have developed a
unique forming system that does not require large staging areas thus allowing for work to commence
earlier on areas outside the building footprint such as the proposed park. See the attached preliminary
schedule under section 8.
~ Listed below under Our Approach you will note that we have selected a team that includes a park-
hardscape specialist. On a completed similar project, Current Builders was constructing a 585 space
garage while Burkhart was performing streetscape improvements as part of the master development in
Boynton Beach. Our recent success working together proves our teaming ability.
~ The vast historical data collected over many years enables us to provide value engineering to the Owners
selecting systems and material in collaboration with the design professionals that provide the most benefit
to the Owner.
Question 9 continued. What can the firm "bring to the table" for the benefit of the City of Sunny Isles
Beach.
~ Building Information Modeling: We are one of the few builders that have adopted this new 3D computer
generated modeling technology which limits change orders and RFI's while reducing construction time
periods which results in savings to the Owner. We have compiled comparative studies on the RO.! using
B.I.M. and the results are impressive. They are so impressive we can cap costs associated with plan
coordination deficiencies.
~ In House Structural Capabilities: Of additional significance, the City of Sunny Isles will rely on the
selected builder to have a thorough understanding of the most critical part of the building i.e. the
structure. Our team has significant experience through our in house CB Structures division where we can
self perform many of our structures. Having recently completed a nearly identical parking garage structure
we have the resources and knowledge to perform quickly and safely while creating cost savings to the
Owner by potentially keeping the structure in-house.
~ Our Management Team: Our team will be lead by William Blackledge who is a 25 year veteran at CB
and also is a Principal. William's large project experience includes notable projects such as the 45 million
dollar Marina Village mixed use project which included an 846 space design build garage. Aaron Buttress
will lead as CB's Project Manager and is a LEED AP. Aaron has managed four garages totaling over
1,655 spaces. He will lead a team with over eighty years experience in the construction industry. See the
organizational chart under section 5 for our other team members.
~ Our Approach: At the pre-submittal conference a question was asked Q# 9. At this point, it is a single
project, both phases, correct? A. Correct, obviously these two phases don't necessarily make the
perfect match, typically park builders are not parking garage builders. We agree with the answer
and have teamed with Burkhart Construction whose expertise is working with Municipal Owners on their
141 P age
cb
current builders
Dlslinc!ive Buildings. DislfllC!lve People
hardscape projects. Coupled with our expertise in garages we can focus on our respective strengths and
deliver it seamlessly. We have worked alongside Burkhart in the past with successful results.
~ Sustainability and Durability: We understand your desire to make the building as green as possible.
Our proposed project manager has recently completed a gold certified office building with a standalone
garage. Additionally all Current Builders project managers are required to be LEED certified to assist in
the green building process. Having completed three design-build garages of similar design we understand
the material choices and quality standards that will be required to protect a long term asset.
~ Quality Control: Current Builders Quality Control process dictates that every project has a unique
quality control plan based on internal guidelines, construction methodology and owner requirements. In
using the establish processes, the Quality Control manager creates a project specific quality control plan,
which includes project specific inspection checklists, frequency and type of testing required, as well as the
scheduling of third party consultants. In support of the site specific quality control plan, Current Builders
supervisory field staff is trained in the use of the software quality control program, with reports monitored
and reviewed by the Quality Control Manager.
~ Safety: Our safety culture has been recognized on the National, State and Local levels. Current Builders
is a founding partner in the Florida CHASE (Construction Health and Safety Excellence) program, a
partnership between OSHA, AGC and member contractors. We have been granted SHARP (Safety and
Health Achievement Recognition Program) status after a rigorous acceptance process. SHARP is an
OSHA partnership that recognizes employers who operate an exemplary safety and health management
system. Acceptance into SHARP by OSHA is an achievement of status that singled out Current Builders
among our business peers as a model for worksite safety and health. Current Builders is only one of a
handful of General Contractors in the Florida who have attained this status.
Question 10 A statement addressing the firms present and projected workload and how this project will
be scheduled within that workload.
~ Current Builders present value of construction is $103,000,000.00 with a backlog of 10,000,000.00. Our
surety credit limit with Travelers is in excess of $150,000,000.00 which indicates $140,000,000.00 of
surety credit available.
~ Our projected workload by midyear is expected to be $65,000,000 with a similar backlog which would
allow for $85,000,000.00 in additional capacity.
>> Our project staffing availability is very similar to our available surety credit meaning at the present time we
have a more than sufficient staff to handle this and other projects.
~ The proposed staff in the organizational chart exemplifies the excellent talent that has been assembled
for this project.
~ Excellent resources are available in the marketplace due to inactivity in the marketplace and we are
confident that our long term association with many of the vendors, suppliers and subcontractors that we
can assemble a highly competent team.
15 I P age
NIELSON, ALTER & ASSOCIATES
April 1, 2009
It has been a privilege of Travelers Casualty and Surety Company of AInerica ("Travelers")
to provide surety bonds CB Constructors, Inc. During that time they have built and we
have bonded projects in the $85,000,000 to $150,000,000 range for a wide variety of
~ owners.
w
no:
~
If)
w Rick Conner, Acting City Manager
~ CITY OF SUNNY ISLES, FLORIDA
~ 18070 Collins
w
tt Sunny Isles, FL 33160
is
<(
w
~
<(
~
~
I
f-
If)
Z
o
i=
~
-'
o
If)
RE: Principal: CB Constructors, Inc.
Project: Heritage Park and Parking Garage-City RFQ No. 09-03-01
Dear Conner:
o It is our opinion that CB Constructors, Inc. is qualified to perform the above captioned
Z project. At their request we will give favorable consideration to providing the required
~- performance and payment bonds.
'fI.
~
o
u
oil
Z
o
If)
-'
w
Z
Please note that the decision to issue performance and payment bonds is a matter between
CB Constructors, Inc. and Travelers, and will be subject to our standard underwriting at
the time of the final bond request, which will include but not be limited to the acceptability
of the contract documents, bond forms and financing. We assume no liability to third
parties or to you if for any reason we do not execute said bonds.
w
>
6 If you have any questions or need any additional information, please do not hesitate to
tJ:: contact our office.
I.L
w
~
W
~
i=
l?
Z
Q?
~
o
no:
a...
~
o
u
Z
~
f-'
no:
<(
~
If)
Sincerely,
~c;.~orneY-in Fact
~:7~LERS CASUALTY AND SURETY COMPANY OF AMERICA
/
Travelers is an A + (Superior) A.M. Best rated insurance company (Financial Size Category XV $2 billion or
more)
8000 Governors Square Boulevard
Suite 101
Miami Lakes, FL 33016
P: 305.722.2663
F: 305.558.9650
www.nielsonbonds.com
ACt! 3 964 713
STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
CONSTRUCT-ION INDUSTRY LICENSING BOARD SEQ#L08083100421
: . LICENSE NBR'
08 31 200B 088024565 CGC150B703
The GENERAL CONTRACTOR
Named below IS CERTIFIED
Under the provisions of Chapte~;4~9 FS.
Expiration date: AUG 31, 2010 --.
i. .
REID, CHARLES P
CB CONSTRUCTORS INC
2251 BLOUNT RD.,.
POMPANO BEACH FL 33069~5114
CHARLIE CRIST
GOVERNOR
DISPlA Y'AS REQUIRED BY LAW
CHARLES W. DRAGO
SECRETARY
ACORDw CERTIFICATE OF LIABILITY INSURANCE CSR TL I DATE (MMIDDIYYVYI
CURRE-2 11/14/08
PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
W.S. Pharr & Company HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
.0. Box 725269 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
.tl.anta GA 31139
Phone: 770-434-8440 Fax:770-434-0146 INSURERS AFFORDING COVERAGE NArc #
INSURED INSURER A: Col.ony Insurance Company
INSURER B:
CB Constructors Inc INSURER C:
2251 Bount Road INSURER 0:
Pompano Beach FL 33069
INSURER E:
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REOUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR
MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
LTR Nsiti TYPE OF INSURANCE POLICY NUMBER DATE IMMIDDrvVt "DATE'~';,o~ LIMITS
GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000
t---
A X COMMERCIAL GENERAL LIABILITY AR4360226-1 11/15/08 11/15/09 PREMISes (E;~~~nce) $ SO, 000
I CLAIMS MADE [!J OCCUR MED EXP (Anyone person) $
- PERSONAL & ADV INJURY $ 1,000,000
- GENERAL AGGREGATE $ 2, 000, 000
GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS. COM PlOP AGG $ 2, 000, 000
I POLICY n f&': . n LOC Emp Ben. 1,000,000
AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT
f-- $
ANY AUTO (Ea accident)
f--
ALL OWNED AUTOS BODILY INJURY
I-- $
SCHEDULED AUTOS (Per person)
I--
HIRED AUTOS BODILY INJURY
- $
NON.OWNED AUTOS (Per accident)
-
PROPERTY DAMAGE $
(Per accident)
GARAGE LIABILITY AUTO ONLY. EA ACCIDENT $
R ANY AUTO OTHER THAN EA ACC $
AUTO ONLY: AGG $
EXCESSIUMBRELLA LIABILITY EACH OCCURRENCE $
=:J OCCUR o CLAIMS MADE AGGREGATE $
$
R DEDUCTIBLE $
RETENTION $ $
WORKERS COMPENSATION AND ITORy"lIMITS I IVEA"
EMPLOYERS' LIABILITY
ANY PROPRIETORIPARTNERIEXECUTIVE E.L EACH ACCIDENT $
OFFICEAlMEMBER EXCLUDED? E.L. DISEASE. EA EMPLOYEE $
~~~Mt"~~~Ji~?6~s below E.L. DISEASE. POLICY LIMIT $
OTHER
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
CERTIFICATE HOLDER
FOR INFORMATION PURPOSES ONLY
CANCELLATION
FORIN02 SHOULD ANY OFTHE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL ~ DAYS WRmEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR
REPRESENTATIVES.
A ED REPRE
@ ACORD CORPORATION 1988
ACORD 25 (2001/08)
ACORD... CERTIFICA TE OF LIABILITY INSURANCE DATE (MMlDDIYYYY)
1113/2008
'qODUCER (954)943-5050 FAX: (954) 943-5H 7 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
....rank H. Furman, Inc. HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
1314 Bast Atlantic Blvd. ALTER THE COVERAGE AFFORDED BY THE POLICIES BelOw.
P. O. Box 1927
~ano Beach FL 33061 INSURERS AFFORDING COVERAGE NAlC#
INSURED INSURER A: Continental Casual ty 20443
CB Constructors, Inc. INSURERS; Bridgefield ~loyers 10701
2251 Blount Road /NSURERc:American Cas Co Reading 20427
INSURER D:
Pompano Beach FL 33069 INSURER E:
THE POlICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOlWlTHSTANDING ANY
REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN.
THE INSURANCE AFFORDED BY THE POliCIES DESCRIBED HEREIN IS SUBJECT TO AlL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POUCIES.
V
INSR ADD'L TYPE OF INSURANCE POUCY NUMBER ,,&~Y EFFECTIve "gi'fl(ffJ;6~N UMITS
~ENERAL UABIUTY $
COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $
I ClAIMS MADE 0 OCCUR MED EXP $
$
AGl"..REGATF $
nN'LAGG~nLIMIT DES PER: . _. $
-EOl1CY !:~P.r LOC
A ~OMOBILE UABlLITY 2075U4391 11/15/2008 11/15/2009 COMBINED SINGLE LIMIT 1,000,000
(Ea aCCident) S
..!.. ANY AUTO
- ALL OWNED AUTOS BODILY INJURY
(Per person) $
- SCHEDULED AUTOS
~ HIRED AUTOS BODILY INJURY $
~ NON-OWNED AUTOS (Per accident)
f-- PROPERTY DAMAGE $
(Per accident)
GARAGE UA8/LITY AUTO ONLY - EA ACCIDENT $
R ANY AUTO OTHER THAN ",. ,,.,.. I.,
AUTO ONt Y: AGG S
pESSlUMBREU..A UABIUlY ""''''~'''' S
OCCUR 0 ClAIMS MADE S
S
q DEDUCTIBLE S
~ETENTION S ~I 1$
B WORKERS COMPENSATION AND 083037079 11/15/2008 11/15/2009 IO~
EMPLOYERS' LIA8IUTY
ANY PROPRlETORlPARTNERiEXECUTIVE E.L EAQ; ACOOENT 1$ 1,000,000
OFFICERlMEMBER EXClUDED? E.L. DISEASE - EA EMPLOYEE $ 1,000,000
If yes. describe under 1,000,000
",;,:,;.;,.., ';""VISIO"''' """ ~ E.L. DISEASE - POLICY LIMIT S
C OTHER Leased/Rented 2075174357 11/15/2008 11/15/2009 Maximum Lo.. Amount $750,000
Bquipment Deduetible $2,500
DESCRIPTION OF OPERAnoNSIlOCATlONSNEHICLESfEXCLUSlONS ADDED BY ENDORSEflENTISPEOAl PROVISIONS
CERTIFICATE HOLDER
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFO~E THE
"For Bidding Purposes Only" EXPIRATION DATE THEREOF, THE ISSUING INSU~E~ WILL ENDEAVO~ TO MAIL
~ DAYS WRmEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT
FAILURE TO DO so SHALL IMPOSE NO OBUGATlON OR lIABIUlY OF ANY KIND UPON THE
INSURER-ITS AGENTS OR REPRESENTATIves.
AUTHORIZED REPRESENTATIVE ?-.# ';,L~-_._.J-.
Frank Furman. Jr/JC
CANCELLATION
ACORD 25 (2001/08)
INS025 (0108).088
~ ACORD CORPORATION 1988
Page 1 0/2
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY
PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted
to City of Sunny Isles Beach
by Charles P. Reid
for CB Constructors, Inc.
whose business address is
2251 Blount Road
~ompano Beach, Fl 33069
and (if applicable) its Federal Employer Identification Number (FEIN)
06-1730927
(If the entity had no FEIN, include the Social Security Number of the individual signing this
sworn statement:
2. I understand that a "public entity crime" as defmed in Paragraph 287. 133(l)(g), Florida
. Statutes, means a violation of any state or federal law by a person with respect to and directly
related to the transaction of business with any public entity or with an agency or political
subdivision of any other state or of the United States, including, but not limited to, any bid or
contract for goods or services to be provided to any public entity or an agency or political
subdivision of any other state or of the United States and involving antitrust, fraud, theft,
bribery, collusion, racketeering, conspiracy, or material misrepresentation.
3. I understand that "convicted" or "conviction" as defined in Paragraph 287. 133(1)(b), Florida
Statutes means a finding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial court of record relating to charges brought by
indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry
of a plea of guilty or nolo contenders.
4. I understand that an "affiliate" as defined in Paragraph 287.133(l)(a), Florida Statutes, means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the management of the
entity and who has been convicted of a public entity come. The term "affiliate" includes
those officers, directors, executives, partners, shareholders, employees, members, and
agents who are active in the management of an affiliate. The ownership by one person of
shares constituting a controlling interest in another person, or a pooling of equipment or
income among persons when not for fair market value under an ann's length agreemeilt,
shall be a prima facie case that one person controls another person. A person who
knowingly enters into a joint venture with a person who has been convicted of a public
entity crime in Florida during the preceding 36 months shall be considered an affiliate.
16
SIGNATURE OF AFFIANT
(Printed or Typed Legal Name of Affiant)
17
State of Florida of County of Miami-Dade /"1-, I
Sworn to and subscribed before me this '7 day of /'7 f"'V . G
~~\J~ ~ -p ~\d
~-X/
CS -- f(lGlIO 11
Notary Seal: ~!J'f~.~ MYCOM~~\ON*00758017
1:.: ~~ EXPIRES', Match 4. 2.012 .
· \ 1l1lIl NotaiY Pubiic unQelWlilers
" Bonded
Notary's Name Printed, Stamped or Typed
Personally Known:
t/
or Produced Identification
Identification Produced
, 2009 by
18
NON-COUUSIVE AFFIDA VIT
State of
Florida)
County of
Miami-Dade)
Charles P. Reid
and says that:
being fIrst duly sworn, deposes
(1) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully informed respecting the preparation and contents of the attached Bid and
of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded, conspired,
connived or agreed, directly or indirectly, with any other Bidder, fIrm, or person to submit a
collusive or sham Bid in connection with the Work for which the attached Bid has been
submitted; or to refrain from bidding in connection with such Work; or have in any manner,
directly or indirectly, sought by agreement or collusion, or communication, or conference with
any Bidder, fIrm, or person to fIx the price or prices in the attached Bid or of any other Bidder, or
to fIx any overhead, profIt, or cost elements of the Bid price or the Bid price of any other Bidder,
or to secure through any collusion, conspiracy, connivance, or unlawful agreement any
advantage against the City of Sunny Isles Beach, Florida, or any person interested in the
proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any
other of its agents, representatives, owners, employees or parties in interest, including this
Affiant.
~'
Charles P. Reid - CEO
(Printed or Typed Legal Name of Affiant)
SIGNATURE OF AFFIANT
21
State of Florida of County of Miami-Dade
1
-P ~e\rl
Sworn to and subscribed before me this
day of ~uJ2
C /h0A-l Y 9- ~
~
Notary Seal: 6 -
....~'r'.. RITAFOGUO
. l~, ~~ MY COMMISSION 1100758017
!*{ i""j: EXPIRES: March 4, 2012
"-i' . Bonded lhtu Nolary PubliC Unde!"Nlilell
.'
Notary's Name Printed, Stamped or Typed
Personally Known: / or Produced Identification
Identification Produced
, 2009 by
21