HomeMy WebLinkAboutWeitz
Ll
"]
~
WEITZ
BUILD IN GOOD COMPANY.
City of Sunny Il>Ie, 6euc:h
Olflcc of the Cl eler\(
ORIGINAL
The City of Sunny Isles Beach
Sunny Isles Beach Government Center
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Request for Qualifications No. 09-03-01
Professional Construction Services for the
Heritage Park and Parking Garage
Submission Date: April 8,2009, 10:00 am
-
The City of Su n ny Isles Beach
Request for Professional Construction Services for
The Heritage Park and Parking Garage
Of su~
Table of Contents
Cover Page..... ....... .................................. ................................ .......... ...1
Table of Contents........................ ........................................................ 2
Letter of Interest.................................................................................. 3
Executive Summary................... ...................... .................... .......... ......4
Requirements 1 - 4 Company History and Location............................ 5
Requirements 5 - 6 ProjectTeam.........................................................6 - 8
Requirement 7 Project Experience................................................... 9 - 10
Requirement 8 Scheduling and Coordination................................... 11 -12
Requirement 9 The Weitz Advantage................................................ 13 - 14
Requirement 10 Current and Projected Workload.............................. 15
Public Entity Crimes Statement............................... 16 -18
Non-Collusive Affidavit............................................. 20 - 21
Requirement 11 Licenses, Insurance, and Bonding Capabilities........ 22 - 26
c;ciia
..
..........~
CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE
3
1
WEITZ
BUILD IN GOOD COMPANY.
4000 HOLLYWOOD BLVD. I SUITE 120 N I HOLLYWOOD I FL 33021 I PH:954.241.0141 I FX:954.241.0144 I WWW.WEITZ.COM
April 8, 2009
Mr. Rick Conner, Acting City Manager
Mr. Jorge Vera, Assistant City Manager/Services
Mr. Bill Evans, Acting Public Works Director
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
REFERENCE:
Professional Construction Services for the Heritage
Park & Parking Garage
Dear Panel Members,
The Weitz Company is pleased to present our qualifications for Professional Construction
Services for the Heritage Park and Parking Garage Project for your consideration. In the spirit
of keeping to Mr. Conner's request at the Pre-Bid Meeting that all applicants' responses be
brief and "to the point", I believe you will find that our submission meets those requirements
and will accurately demonstrate our qualifications, experience in like-kind projects, and our
value-added partnering approach with the City of Sunny Isles Beach. Working with The Weitz
Company will be a smooth and satisfying process for the City and we hope our submittal
allows us the opportunity to present our services further.
As you know, The Weitz Company has already demonstrated our value-added skills with the
City of Sunny Isles Beach once before by constructing your Sunny Isles Beach Government
Center in 2005, completing it two months ahead of schedule.
It is our pledge to the City of Sunny Isles Beach that The Weitz Company will provide you with
the quality team that successfully constructed your Government Center back in 2005. We look
forward to an opportunity to work with you again. We acknowledge receipt of Addendums #1
& 2, and Request for Clarifications #1-7.
Until then, I remain
HONESTY ANO INTEGRITY. RESPECT FOR PEOPLE. PERFORMANCE WITH ABSOLUTE RELIABILITY. LONG-TERM PERSPECTIVE. NURTURING PERSONAL GROWTH
EXECUTIVE SUMMARY
Sunny Isles Beach receives a partnership
approach with our Project Team.
Gary
Hennings.
V. P. / Chief
Estimator
Rick Kolb,
Construction
Manager
Jonathan
Sharon,
Project
Manager
Dave
Swiercinsky,
Senior Project
Superintendent
A proven partnership with your City staff,
combined with our parks and parking structure
experience provides a satisfying source for
construction services.
City of
Sunny
Isles Beach
Government
Center
Miramar
Regional
Park
PBC
Judicial
Garage
South
County
Regional
Park
PBC South
County
Courthouse
Parking
Garage
The Weitz Company is committing the same
Project Team that constructed your Sunny Isles
Beach Government Center. Each member of this
team has a history of partnering with you as well
as on other government agency projects. As your
advocate for Heritage Park and Parking Garage,
your Team will ensure your project is properly
planned, constructed, and commissioned for the
City of Sunny Isles Beach. By using this Team,
you will benefitfrom theirfirst-hand experience
in constructing both parking structures and
parks. For more detailed information on your
team, please refer to the resumes on pages 7 and
8 ofThe Weitz Company's submission.
Well-planned cost and quality control methods
guarantee expectations are met.
Experience in the South Florida market provides
us with unmatched cost data that will help in
ensuring your budget requirements are met. Also,
throughout the project your team will work to
maximize your value through value analysis from
preconstruction through the end of the project.
,.~~ -;jc~"'''~ r1:
""% "S-,~ ~!;>l',., ,j
Quality control will
begin during the
Preconstruction
planning phase. The
use of our Zero-
Defect Process,
including mock-ups,
will guarantee that
all members of the Project Team, from the Owner
to the NE to the Subcontractors, are all on the
same page when it comes to quality expectations.
CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE
COMPANY HISTORY AND LOCATION
Your project is YOUR
LEGACY - AND OURS.
Le Meridien, Sunny Isles Beach
-- constructed by Weitz
Construction Manager, Rick Kolb
154 years of successfully completed projects provides
you with peace of mind.
Company History:
The Weitz Company has been providing quality construction services
since 1855. Offering a full range of construction services, Weitz will put
in place approximately $1.6 billion this year. In 2008, our total revenue
was $1,665,741,657 and in 2007 totaled $1.474.428,368. As an employee-
owned company, our financial strength and commitment to our Core
Values positions us as a leader in the construction industry with the ability
to attract and retain quality personnel.
The Florida Division ofThe Weitz Company was established in 1978 and
has grown to become one of the largest and most reputable builders
in the state. Since entering the Florida marketplace, the business unit
has completed more than $3.5 billion of diverse project types that have
ranged in both size and complexity. No significant company changes are
anticipated during the duration of this project.
Ownership: Privately held, employee-owned company, Des Moines, IA
Florida Business Unit Officers:
Dennis Gallagher, President
Gary Hennings, Vp, Chief Estimator
Jon Tori,Sr. VP of Construction Services
Clayton Garrison, VP, Construction Manager
Jim Wells, Vp, Director of Preconstruction
Corporate Office:
THE WEITZ COMPANY. LLC
400 Locust Street, Suite 300
Des Moines, IA 50309-2331
Office involved with this project:
THE WEITZ COMPANY
4000 Hollywood Blvd. Suite 120N
Hollywood, FL 33021
Other Offices:
Cedar Rapids, IA
Des Moines, IA
Lincoln, NE
Omaha, NE
Gig Harbor, WA
Denver, CO
Frisco, CO
Glenwood Springs, CO
Honolulu, HI
Dededo, GU
West Palm Beach, FL
North Palm Beach, FL
Jacksonville, FL
Kansas City, KS
Overland Park, KS
Navato, CA
Temecula, CA
Tucson, AZ
Bavaro, Dominican Republic
CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FORTHE HERITAGE PARK AND PARKING GARAGE
PROJECT TEAM
Your ProjectTeam brings the right experience to the Heritage Park and Parking
Garage.
SPILUS
CANDELA
WEITZ
PROJECT
ENGINEER
PROJECT
MANAGER
Bruce Hammond
SR. PROJECT
SUPERINTENDENT
Chris Hill
Time on Project: 100%
Mike Mallory
Time on Project: 20%
Dave Swiercinsky
Time on Project: 100%
~ I PROJECT
""'" ACCOUNTANT
Noelle Gantz
Time on Project: 33%
Your Sunny Isles Beach
Government Center Staff
D Office Staff
D On-Site Staff
CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE
Years Experience 18
Years with Weitz 08
Years Experience 11
Years with Weitz 06
JR Rick Kolb - Construction Manager
RESPONSIBILITIES
As Construction Manager for The Weitz Company, Mr. Kolb is responsible for
overseeing the South Florida Business Unit, including staffing assignments,
project plan development, cost and schedule analysis, owner and subcontractor
negotiations, employee training, and risk management.
EDUCATION / RELATED EXPERIENCE
· Michigan State University, Bachelor of Science, 1984
· Broward Education Foundation - Board of Directors
· OSHA 1 O-hour certified
Bruce Hammond - Regional Safety Manager
RESPONSIBI L1TI ES
As Regional Safety Manager, Mr. Hammond will make regular jobsite visits at
all of our projects to assure the safety and security plan implemented at the
onset of a project is carried out by each of our on-site staff and subcontractors,
and will streamline communication throughout the project to minimize risk.
EDUCATION / RELATED EXPERIENCE
· Marshall University, Masters in OSHA, 1992
· Construction Health & Safety Technician (CHST)
· Certified Professional Environmental Auditor (CPEAU)
SOUTH COUNTY
COURTHOUSE
-- -. ,-.-.~
--~
~
Jonathan Sharon - Project Manager
RESPONSIBILITIES
As Project Manager for The Weitz Company, Mr. Sharon works closely with
Project Superintendents to ensure the overall success of a project during the
construction phase. His duties include project pre-planning, scheduling, cost
control, subcontractor management, contract negotiations and administration,
staging and logistics planning, and project reporting, to name a few.
EDUCATION / RELATED EXPERIENCE
· University of Florida, B.S. in Microbiology and Chemistry, 1997
· OSHA certified 10-hour
CITY OF SUNNY ISLES BEACH
RFO FOR CONSTRUCTION SERVICES FORTHE HERITAGE PARK AND PARKING GARAGE
Years Experience 09
Years with Weitz 03
Years Experience 02
Years with Weitz 02
Dave Swiercinsky - Sr. Project Superintendent
RESPONSIBILITIES
Mr. Swiercinsky is responsible for supervising all of the work that our firm will
place in the field including that of our subcontractors, including site quality
control, safety, schedule management, logistics, subcontractor coordination,
jobsite record-keeping, and the management of all self-performed work.
EDUCATION / RELATED EXPERIENCE
· Kansas State University, B.S. Building Construction
· OSHA Certified - 10 Hours
· Cloud Community College, A.A. in Architecture
Chris Hill - Project Engineer
RESPONSIBI L1TI ES
As Project Engineer, Mr. Hill is responsible for contract management, material
expedition, project scheduling, shop drawing review, and engineering
coordination. Mr. Hill will oversee Prolog Manager, our firm's web based project
management software used to expedite communication during construction.
EDUCATION / RELATED EXPERIENCE
· University of Florida, B.S. Building Construction, 2005
· Richmond University, London, England, 2003
· OSHA 10-Hour Certified
Mike Mallory - Assistant Project Engineer
RESPONSIBILITIES
As Assistant Project Engineer, Mr. Mallory will expedite routing for approval
of purchase orders, subcontracts and amendments to assure they are fully
executed and returned in a timely fashion; provide assistance with drafting
and typing purchase orders, subcontracts, amendments, and preparing code
adjustments; expedite receipt of certificates of insurance, licenses, and bonds
as required from sub-contractors.
EDUCATION / RELATED EXPERIENCE
· St. John's Preparatory School, Danvers, MA
CITY OF SUNNY ISLES BEACH
RFO FOR CONSTRUCTION SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE
D.!JIIII] IE!) ~.:I.)ll ~.)~'LJ~
PROJECT EXPERIENCE
.
JIll
.
I~
~
~~
~
..
.
'*
SOUTH COUNTY COURTHOUSE
PARKING GARAGE
126,400 SF
$4 million
SUNNY ISLES BEACH GOVERNMENT
CENTER
114,238 SF
$14.9 million
PBC JUDICIAL CENTER GARAGE
186,000 SF
$13.2 million
MIRAMAR REGIONAL PARK
45-acre site
$22.7 million
CITY OF DELRAY SOCCER COMPLEX
36,467 SF
$10.8 million
SOUTH COUNTY COURTHOUSE
108,000 SF
$24.4 million
SOUTH JUPITER COMMUNITY PARK
PHASE I
154,400 SF
$3.7 million
THE PINE SCHOOL
80,000 SF
$20.4 million
SCRIPPS FLORIDA RESEARCH
INSTITUTE
364,000 SF
$160 million
FPL TURKEY POINT MAINTENANCE
FACILITY
65,618 SF
$7.5 million
o
MR. BILL DEBECK
Palm Beach County Facilities Dev. & Operations
(561) 233-0266
*Repeat Client
MR. JORGE VERA
City Of Sunny Isles Beach
(305) 947-0606
MR. CLAY PARKER
City Of Sunny Isles Beach
(954) 557-6288
MR. MICHAEL MCPHERSON
Palm Beach County Facilities Dev. & Operations
(561) 233-0266
*Repeat Client
MR. LUIS LOPEZ
City of Miramar
(954) 602-3316
MR. RICH HASKO
City of Delray Beach
(561) 243-7336
MR. JOHN CHESHER
Palm Beach County
(561) 233-0266
*Repeat Client
MR. BERNIE SCHATTNER
Town of Jupiter
(561) 741-2515
MR. JIM CANTWELL
The Pine School
(772) 283-1222 x307
MR. BEN MORRIS
The Scripps Research Institute
(858) 784-8933
MR. KEVIN HUGHES
Florida Power & Light Company
(561) 691-2807
*Repeat Client
CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FORTHE HERITAGE PARK AND PARKING GARAGE
;;
--.'
181
.
11
II
~
~.~.
" A
==
=--- ~
~ ~
-
......:...'.
. r
,<
"
I~,.,~.
I --
I
I ,"
SOUTH COUNTY REGIONAL PARK
31,976 SF
$18 million
DANIA ELEMENTARY SCHOOL
18,000 SF
$7.1 million
PALM BEACH LAKES HIGH SCHOOL
AUDITORIUM
31,206 SF
$10.3 million
HAGEN RANCH ROAD LIBRARY
20,000 SF
$10.4 million
WELLINGTON HIGH SCHOOL
AUDITORIUM
31,218SF
$11.5 million
CITRUS COVE ELEMENTARY
105,064 SF
$9.3 million
WELLINGTON HIGH SCHOOL
VETERINARY ACADEMY
30,351 SF
$2 million
SATELLITE BEACH HIGH SCHOOL
110,000 SF
$31 million
PALM BEACH ATLANTIC UNIVERSITY
PHASES 1 & II
81,000 SF
$23 million
THE BREAKERS HOTEL NEW TOWERS &
RENOVATIONS
304,000 SF
$60 million
MR. JOHN CHESHER
Palm Beach County
(561) 233-0266
"Repeat Client
MR. MIKE GARRETSON
School District Of Broward County
(754) 321-1510
"Repeat Client
MR. GIL DAVIS
School District of Palm Beach County
(561) 353-1447
"Repeat Client
MR. BILL DEBECK
Palm Beach County Facilities Dev. & Operations
(561) 233-0266
"Repeat Client
MR. GIL DAVIS
School District of Palm Beach County
(561) 353-1447
"Repeat Client
MR. DAVID SWAN
School District of Palm Beach County
(561) 434-8874
"Repeat Client
MR. WARREN HAAN
School District of Palm Beach County
(561) 357-7578
"Repeat Client
MR. DANE THEODORE
School District of Brevard County
(321) 633-1000
MR. GARY PARKER
Palm Beach Atlantic University
(561) 803-2069
"Repeat Client
MR. PAUL LEONE
The Breakers Hotel Palm Beach
(561) 659-8493
"Performed work onsite for 75 straight years
CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FORTHE HERITAGE PARK AND PARKING GARAGE
SCHEDULING AND COORDINATION
City of Sunny Isles Beach
Government Center
- constructed by Weitz
Innovative scheduling techniques ensure your project
is completed on time.
The Weitz Project Team will be using the Suretrak scheduling software
to generate and manage the project schedule. This software program
allows for detailed planning of each phase of the Project. identifies
which activities form the critical path and identifies opportunities for
acceleration. In addition to construction activities. extensive information
can be included in the project schedule, increasing its accuracy (owner-
requested milestones. manufacturing lead times. material procurement
and availability of key equipment). During the creation of the Project
Schedule, activities are added as necessary to increase the effectiveness
of the schedule while providing the most opportunities for acceleration.
Subcontractor input is solicited during the bid phase, resulting in more
accurate activity durations.
The Weitz Project Team performs a weekly schedule review and cross
references the Superintendent's daily reports as a means of providing a
"true real time picture" of the job status. Weekly updates are completed
with the subcontractor's participation, allowing for meaningful input
and coordination of the work. and making them accountable for their
commitments. For activities that are behind schedule, appropriate make-
up plans with the affected subcontractors are coordinated, executed in
the field and monitored for compliance.
The project Baseline Schedule is updated on a monthly basis and the
short interval schedules are updated on a weekly basis.
Short interval schedules are distributed and reviewed at
the weekly subcontractor coordination meetings and the
Baseline Project Schedule is distributed monthly to the
Owner.
Lean is a production management-based
approach to project delivery. Lean principles
promote continuous improvement.
innovation, and accountability of all
stakeholders. It occurs through successive
levels of planning starting from overall
promises, then to weekly and daily planning
where the details are worked out-what is to
be done, by whom. and by a specific date.
so that the work can be carried out.
The Last Planner system establishes
conditions that must be met for the next
phase of work to move forward. establishing
constraints, the person responsible for
removing that constraint, and the promised
date. Examples of restraints are answers
to Requests for Information, a trade that
is behind schedule, or the late delivery of
materials.
As the work begins in the field, the short interval
schedules are developed covering a six (6) week time
period where the scheduling process begins to break
the project down into more finite activities and shorter
durations. This becomes our primary scheduling tool for
completing the project in line with the milestone dates
established in the baseline project schedule.
In conjunction with the project schedule, The Weitz
Company. will utilize Lean and The Last Planner system
to increase teamwork and schedule effectiveness. The
system enforces accountability of all trades and team
members. In using this process the project receives the
benefit of opportunities to accelerate the schedule on a
continual basis.
CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FORTHE HERITAGE PARK AND PARKING GARAGE
PBC Judicial Garage
- constructed by Weitz
WE ARE YOUR
ADVOCATES at every
step, delivering a quality
building experience.
The Weitz Company's reputation for quality ensures
your project is first class in every way.
We will employ the following tools and techniques for the The City of
Sunny Isles Heritage Park and Parking Garage project:
Experienced Preconstruction personnel to incorporate quality
details in the design
Mock-ups that set the bar for quality prior to construction
A Quality Manual that will facilitate a zero item punchlist
Implementation of The Weitz Company's Quality Control
program administered, tracked, and reported from our
Superintendent to our Project Manager.
The City of Sunny Isles Beach is known for building quality projects (i.e.
Sunny Isles Beach Governemnet Center, constructed by Weitz) that
exemplify detailed planning and a "higher than standard" feel. Given that
The Weitz Company is often selected on the basis of quality, this makes
for a perfect team. We have established a reputation for performing
difficult projects that demand the highest standard for quality. Quality
control has many elements. This ranges from the work product that
is produced in preconstruction, to ultimately the end product that is
constructed. To ensure quality is designed into the project, Weitz reviews
plans, suggests design details, building materials, and building systems
that deliver the level of quality that you are seeking. As one example,
the decisions made regarding the exterior enclosure of the building are
without question extremely important given the harsh environment of
South Florida. The Weitz Company has the knowledge to ensure that
your project will perform as expected in all design conditions by providing
input and options on roofing systems, glazing systems, caulking details,
and flashing details based on 30 years of experience in Florida. These
systems and details need to be well thought-out in preconstruction so
that they are coordinated and incorporated on the drawings before the
project is under contract.
A tool that The Weitz Company employs during the construction phase
is the use of mock-ups and first in-place installations where appropriate.
Although this is not new or revolutionary it can be an invaluable tool to
identify issues and more importantly set expectations for fit and finish.
The Weitz Company will utilize our Quality Control Field Manual on your
project. This manual combinines lessons learned and best practices that
have been developed on Weitz projects nationwide. The QNQC program
starts during preconstruction, with meetings held shortly after the trade
award, and Pre-installation meetings held prior to work commencing in the
field. This manual guarantees that details are understood and performed
successfully in the field. The ultimate goal is a level of quality assurance
and quality control that result in a zero item punch list at completion. This
is accomplished by proper planning and "real time" supervision while
materials are being installed. Quality Control is not identifying defects
after installation, but rather building quality into installation.
CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FORTHE HERITAGE PARK AND PARKING GARAGE
THE WEITZ ADVANTAGE
The City of Sunny Isles Beach benefits from the unique services we "bring to
the table."
The Weitz Company portfolio is proud to include
79% of its projects as public sector work.
Our public sector work has been performed
under CM at Risk, Hard Bid, and Design-Build
delivery methods. In fact, one of our past
successes includes your City of Sunny Isles
Beach Government Center. In addition, we
have successfully completed parking structures
and recreational parks for various municipalities
such as Palm Beach and Broward Counties,
the City of Delray, and the City of Miramar,
and we look forward to bringing our expertise
to your project! Our tools listed below are the
"value added" that The Weitz Company brings
towards a successful project in a true partnering
approach.
Scope of Work Checklists: We will
review the drawings/specifications for
construction sequencing, detail feasibility,
and schedule/cost effectiveness.
Budgeting and Value Analysis
Reporting: Detailed budgets and value
analysis reports will be reviewed with you
and Spillis Candela on a regular basis with
cost variances being easily tracked. Our
detailed variance budget tracking system
allows the City of Sunny Isles Beach to
see where all the costs are tracking for
each trade and allows you to make the
best design decisions as your project moves toward final construction documents. We have already met
with a precast subcontractor regarding the feasibility and advantages of revising the design, and look
forward to working with the design team members to focus on efficiency with constant attention to
the overall aesthetics. The Weitz Company will look at all options and systems and properly weigh cost
differential against time impacts and life cycle.
CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FORTHE HERITAGE PARK AND PARKING GARAGE
Building Information Modeling (BIM): produce 3D project drawings for coordination, layout &
constructability reviews, which reduces lost time, RFI's and change orders.
Weitz and their major subs can model key building components using Constructor and Navisworks
software to facilitate the shop drawing coordination and clash detection process. The most significant
benefit realized by using BIM through both the design and construction process is the reduction of RFI's
generated during construction, resulting in a reduction of both lost time and change orders.
Subcontractor Prequalification: The Weitz Company prequalifies all of our subcontractors for safety
procedures, level of performance, quality of performance, and bonding capacity.
Safe work to eliminate the disruption of lost time: The Weitz Company's safety record exceeds
our competition-our Experience Modification Ratio is a best in class at 0.51. In fact, The Weitz Company
has not had a lost-time incident since 2004. We also want you to know that we have put in over 1.9 million
man-hours during this ongoing record.
The Weitz Company will utilize innovative techniques to complete your project faster: By
utilizing proven scheduling methods in conjunction with constructability modeling, we will complete your
project faster. The two projects charted below
enjoyed substantial schedule reductions as a
direct result of Lean scheduling. For example,
the Hy-Vee store had been built more than
20 times previously. By using Lean, we cut
an additional three weeks (or 10%) from a
schedule that the Client believed had been
optimized, resulting in over $300k in savings
for the Client.
Weitz use of LEAN In ovation Saves Time and
Money
In
;
c:
o
==
.Acheived Schedule
w/LEAN
o Baseline Schedule
Hy-Vee Store
Other Services-Building with Long-
Term Efficiency for the Greatest Value
In support of your goal to incorporate
"green" elements into the Heritage Park
and Parking Garage, we have assigned a "Green Champion" to present the life-cycle cost analysis for
your project, as well as providing guidance and reporting for the Leadership in Energy and Environmental
Design (LEED) Certification level for your project. The LEED AP that we
provide to you is fluent in the requirements of obtaining LEED certification,
including point submittals, and will ensure the City of Sunny Isles Beach that
a cost-efficient design, with input from Subcontractors on the latest LEED-
compliant materials, life-cycle costs, and energy efficiency are an integral part
of the design and construction that will lead to positive long term savings.
Iowa Health
Systems
TWe LEAN Successes
CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FORTHE HERITAGE PARK AND PARKING GARAGE
CURRENT AND PROJECTED WORKLOAD
The right resources are guaranteed to be available for your project.
Your needs will be met by your proven Sunny Isles Beach Government Center ProjectTeam. As the chart
below shows, our highly qualified and professional staff will be available for your project. All required
resources will be fully available to supplement your ProjectTeam throughout the construction process.
r-----
'------
SUNNY ISLES HERITAGE PARK
---------
---------
~
.J
FORT LAUDERDALE HIGH SCHOOL
WALKER ELEMENTARY
FPL CASK CRANE PILINGS
VILLAGE ELEMENTARY
.
LLOYDS ESTATES ELEMENTARY
.
Now
+6 MO
+ 1 YR
+ 1 YR 6 MO
+ 2 YRS
CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FORTHE HERITAGE PARK AND PARKING GARAGE
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY
PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted
to The City of Sunny Isles Beach
by The Weitz Company
for The Heritage Park and Parking Garage RFQ No. 09-03-01
whose business address is
1720 Centrepark Drive East
West Palm Beach, FL 33401
and (if applicable) its Federal Employer Identification Number (FEIN)
42-1512625
(If the entity had no FEIN, include the Social Security Number of the individual signing this
sworn statement:
2. I understand that a "public entity crime" as defined in Paragraph 287. 133(l)(g), Florida
Statutes, means a violation of any state or federal law by a person with respect to and directly
related to the transaction of business with any public entity or with an agency or political
subdivision of any other state or of the United States, including, but not limited to, any bid or
contract for goods or services to be provided to any public entity or an agency or political
subdivision of any other state or of the United States and involving antitrust, fraud, theft,
bribery, collusion, racketeering, conspiracy, or material misrepresentation.
3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida
Statutes means a fmding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial court of record relating to charges brought by
indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry
of a plea of guilty or nolo contenders.
4. I understand that an "affiliate" as defined in Paragraph 287. 133(1)(a), Florida Statutes, means:
a. A predecessor or successor of a person convicted of a public entity crime~ or
b. An entity under the control of any natural person who is active in the management of the
entity and who has been convicted of a public entity come. The term "affiliate" includes
those officers, directors, executives, partners, shareholders, employees, members, and
agents who are active in the management of an affiliate. The ownership by one person of
shares constituting a controlling interest in another person, or a pooling of equipment or
income among persons when not for fair market value under an arm's length agreement,
shall be a prima facie case that one person controls another person. A person who
knowingly enters into a joint venture with a person who has been convicted of a public
entity crime in Florida during the preceding 36 months shall be considered an affiliate.
16
5. I understand that a "person" as defined in Paragraph 287. 133(l)(e), Florida Statutes, means any
natural person or entity organized under the laws of any state or of the United States with the
legal power to enter into a binding contract and which bids or applies to bid on contracts for
the provision of goods or services let by a public entity, or which otherwise transacts or applies
to transact business with a public entity. The term "person" includes those officers, directors,
executives, partners, shareholders, employees, members, and agents who are active in
management of any entity.
6. Based on information and belief, the statement which I have marked below is true in a
relation to the entity submitting this sworn statement. (Please indicate which one (1) of the
following three (3) statements is applicable.)
~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of a
public entity crime within the past 36 months.
_(2) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of a
public entity crime within the past 36 months.
_(3) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or agents who are active in management of the entity, or any affiliate
of the entity has been charged with and convicted of a public entity crime within the past 36
months. However, there has been a subsequent proceeding before a Hearing Officers of the State
of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer
determined that it was not in the public interest to place the entity submitting this sworn
statement on the convicted vendor list. (Attached is a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS
FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH
DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE
PERIOD OF THE CONTRACT ENTERED INTO , WHICHEVER PERIOD IS LONGER. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY
PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT
PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE CATEGORY TWO OF
ANY CHANGE IN THE INFORMATION CONTAINED IN THIS FORM.
~ Jon Tori, Senior Vice President
eJNA TURE -~ ~IANT (Printed or Typed Legal Name of Affiant)
17
State of Florida of County of Miami-Dade fh IL
Sworn to and subscribed before me this 'I day of i'T?t211-
, 2009 by
-:JO,..;
--- .
101V
Notary Seal:
~............................................ ~I
: DIANE M. CROOK :
: "~~ Comm# 000651067 =..
. li\ '
i f~ 'Ti Expires 311512011 !
: 1;~ or~<<td :
~ "+",,,,..,, FIortcla Nol8'Y Assn.,lnr. =
. ,..... ... ................ ...... ..... ...... '1.
~~-~
Notary's Name Printed, Stamped or Typed
yJ or Produced Identification
Personally Known:
Identification Produced
18
NON-COLLUSIVE AFFIDA VIT
State of
Florida)
County of
Miami-Dade)
Jon Tori, Senior vice President
and says that:
being first duly sworn, deposes
(1) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidde"r that has
submitted the attached Bid;
(2) He/she is fully informed respecting the preparation and contents of the attached Bid and
of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded, conspired,
connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a
collusive or sham Bid in connection with the Work for which the attached Bid has been
submitted; or to refrain from bidding in connection with such Work; or have in any manner,
directly or indirectly, sought by agreement or collusion, or communication, or conference with
any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or
to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder,
or to secure through any collusion, conspiracy, connivance, or unlawful agreement any
advantage against the City of Sunny Isles Beach, Florida, or any person interested in the
proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any
other of its agents, representatives, owners, employees or parties in interest, including this
Affiant.
Jon Tori, Senior vice President
TURE OF AFFIANT
(Printed or Typed Legal Name of Affiant)
20
State of Florida of County of Miami-Dade
Sworn to and subscribed before me this '1 +h
day of
/tpl1'L
, 2009 by
--.-- --
:J oJ,..) /old../
r....n.H...................................:
. DIANE M. CROOK :
i t8 Comm# DD0651De7 !
i _f~ Explres3/15!2:>~1! {L
: ~~~.1 :
. ..~O<",,~.. F1o!'ld- N"tz- 1-- ,. ~
i....:;'i';~:.:~m......;..~,,;,... . .; .~. ~
Notary Seal:
Notary's Name Printed, Stamped or Typed
Personally Known: L or Produced Identification
Identification Produced
21
~ rn:J (ffiX!EJ ~J ~
fE
~
E.P.I.C
EDGEWOOD PARTNERS
Insurance Center
March 31, 2009
Sunny Isles Beach Government eenter
18070 Collins Avenue, City Clerk
Sunny Isles Beach, FL 33160
RE: The Weitz Company, LLC
City of Sunny Isles Beach Heritage Park and Parking Garage
Dear City Clerk:
We are pleased to write to you at the request of our client, The Weitz Company, LLC ("Weitz").
Weitz is a highly regarded and valued client of Edgewood Partners Insurance Center and we are
privileged to provide its bonding requirements. Weitz' financial strength and management capabilities
have qualified it to bond any project it has chosen to undertake. We have received approval on bonds for
Weitz on individual projects in excess of $170,000,000 with a total bonding capacity of $1,200,000,000.
Weitz has surety credit established with Federal Insurance Company of Warren, NJ, which is A. M. Best
rated A++ (Superior) FSC XV, Fidelity and Deposit Company of Maryland of Baltimore, MD which is
A. M. Best rated A (Excellent) FSC XV, and Zurich American Insurance Company of Schaumburg, IL
which is A. M. Best rated A (Excellent) FSC XV, all of which are listed in the Federal Register.
We understand that this project is valued at approximately $12,500,000. We anticipate no problem
providing 100% Performance and Payment Bonds at the request of Weitz should it be awarded this
contract. However, please be advised that the issuance of any final bonds will be subject to confirmation
of appropriate project funding and the acceptable review of the construction contract and bond terms and
conditions by Weitz and its sureties as well as normal underwriting considerations at the time the bonds
are required.
The consideration to issue bonds on these projects is solely a matter between Weltz and its sureties and
neither Weitz, its sureties, nor we assume any liability to third parties or to you by issuance of this letter.
Weitz has an excellent reputation in the construction industry and is ranked among the top 40 builders in
the United States with annual revenues exceeding $1.4 Billion.
If you need further information concerning this fine contractor, please do not hesitate to contact me
directly at (925) 244-7723.
Very Truly Yours,
Lisa Lucas
Assistant Vice President-Bond Division
3000 Executive Parkway, Suite 325, San Ramon, CA 94583
P. O. Box 5003, San Ramon, CA 94583
License# OB29370
CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE
GENERAL LIABILITY INSURANCE
ACORD,. CERTIFICA TE OF LIABILITY INSURANCE I DATE (MM/DDNYVY)
03123/2009
PRODUCER ACIG INSURANCE AGENCY, INC. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
12222 MERIT DRIVE, SUITE 1660 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
DALLAS, TX 75251-0000 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
(972) 702-9004 INSURERS AFFORDING COVERAGE NAIC#
INSURED THE WEITZ COMPANY, LLC INSURER A: American Contractors Ins. Co. RRG 12300
400 LOCUST STREET, SUITE 300 INSURER B: ACIG Insurance Comoanv 199B4
DES MOINES IA 50309 INSURER C:
INSURER D: Zurich American Insurance Comoany 16535
INSURER E:
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWTHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR ADO' TYPE OF INSURANCE POLICY NUMBER P~L~~Y J~fJ8~E Pgk\CEYf~~b~J~ON LIMITS
LTR INSD
~NERAL LIABILITY EACH OCCURRENCE $ 5,000,000
A X COMMERCIAL GENERAL LIABILITY GLOBOOO036 06/01/0B 06/01/09 ~~~~~~loE~~~J~Pencel $ 100,000
D - ~ CLAIMS MADE [K] OCCUR GL05B49452-01 06/01/0 B 06/01/09 5,000
- MED EX? (Anyone person) $
PERSONAL & ADV INJURY $ 5,000,000
GENERAL AGGREGATE $ 7,000,000
~'L AGGR,Erx1 ~~M~ APnS PER: PRODUCTS - COM PlOP AGG $ 7,000,000
POLICY X JEer LOC
~TOMOBILE LIABILITY COMBINED SINGLE LIMIT $
ANY AUTO (Ea Accident)
-
ALL OWNED AUTOS BODILY INJURY
- (Per person) $
- SCHEDULED AUTOS
HIRED AUTOS BOOll Y INJURY $
- (Per accident)
- NON-OWNED AUTOS
PROPERTY DAMAGE $
Per accident)
~~GE LIABILITY AUTO ONL Y ~ EA ACCIDENT $
ANY AUTO OTHER THAN EAACC $
AUTO ONLY: AGG $
tJ~SS/UMBRELLA LIABILITY EACH OCCURRENCE $
OCCUR D CLAIMS MADE AGGREGATE $
$
R ~EOUCTIBLE $
RETENTION $ $
WORKERS COMPENSATION AND X WM,~r~mt IpTH.
B EMPLOYERS' LIABILITY WCOBOOOOB7,WCOBOOOOBB 06/01/0B 06/01/09 ER
ANY PROPRIETORIPARTNERlEXECUTIVE E.L. EACH ACCIDENT $ 1,000,000
OFFICERlMEMBER EXCLUDED? WCOBOOOOB9 06/01/0B 06/01/09 E.L. DISEASE - EA EMPLOYEE $ 1,000,000
~~Etl~t~~6~~1o~s below WCOBOOO090 06/01/0B 06/01/09 E.L DISEASE - POLICY LIMIT $ 1,000,000
OTHER
DESCRIPTION OF OPERATIONS/LOCATIONSNEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS
For BidlProposal Only. Weitz Florida: City of Sunny Isles Beach Heritage Park & Parking Garage. Certificate Holder is included as an
Additional Insured as respects General Liability. Waiver of Subrogation applies for Workers Compensation.
CERTIFICATE HOLDER CANCELLATION Certificate ID 36,B05
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
City of Sunny Isles Beach DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL~ DAYS WRITTEN
1 B070 Collins Avenue NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
Sunny Isles Beach, FL 33160 IMPOSE NO OBLIGATION OR LlABILlTY OF ANY KIND UPON THE INSURER,ITS AGENTS OR
REPRESENTATITIVES.
AUTHO~SEIlTATIVE
/ . ;'/< ~..~ MICHAEL J. O'NEILL
ACORO 25 (2001/08)
7BN3DCFBKCHBLD
@ACOROCORPORATlON 1988
CITY OF SUNNY ISLES BEACH
RFO FOR CONSTRUCTION SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE
IEiI
UtJIL(':J Il!J @.~ ~]\~
~
BUSINESS AUTOMOBILE INSURANCE
ACORQ.
DATE (MM/DD1YY)
03123/09
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POUCIES BELOW.
CERTIFICATE OF LIABILITY INSURANCE
PRODUCER
Holmes Murphy & Asaoa - WDM
1-800-247-7756
PO Box 9207
Des Moines, IA 50306-9207
INSURERS AFFORDING COVERAGE
INSURED
The Weitz Company LLC
400 Locust, Suite 300
INSURER A: Zurich American Insurance Co.
INSURER B:
INSURER C:
INSURER 0"
INSURER E:
Des Moines, IA 50309
I
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
I!,,~~ TYPE OF INSURANCE POUCY NUMBER POUCY EFFECnvE POLICY EXPIRATION LIMITS
~NERAL LIABILITY EACH OCCURRENCE S
- 5~ERCIAL GENERAL LIABILITY FIRE DAMAGE (Anyone fire) $
- ClAIMS MADE D OCCUR MED EXP (Anyone person) $
- PERSONAL & ADV INJURY $
- GENERAl AGGREGATE $
4'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMPIOP AGG S
POLICY n ~~9.; n LOC
A ~TOMOBILE LIABILITY BAP9374131-05 06/01/08 06/01/09 COMBINED SINGLE LIMIT
S 1,000.000
X AN'( AUTO (Ea accident)
-
- ALL OI/v'NED AUTOS BODILY INJURY
$
SCHEDULED AUTOS (Per person)
-
~ HIRED AUTOS BODILY INJURY
S
~ NON-OVvNED AUTOS (Per accident)
PROPERTY DAMAGE $
(Per accident)
RRAGE UABILlTY I I AUTO ONLY - EA ACCIDENT $
AN'{ AUTO OTHER THA.N EA ACC $
AUTO ONLY: AGG S
EXCESS LIABILITY EACH OCCURRENCE S
D"oCCUR D ClAIMS MADE AGGREGATE S
$
R DEDUCTIBLE $
RETENTION $ S
WORKERS COMPENSATION AND ~STATU- I IOJ~'
EMPLOYERS' LIABILITY ~y liMITS
E.L EACH ACCIDENT S
E.L DISEASE. EA EMPLOYEE S
E.L DISEASE - POLICY LIMIT S
lomR I I I .
.
.
DESCRIPTION OF OPERATIONS/LOCATIONSNEHICLESfEXClUSIONS ADDED BY ENDORSEMENTISPECIAL PROVISIONS
For Bid/Proposal Only. Weitz Florida: Ci ty of Sunny Isles Beach Heri tage Park & Parking Garage.
CERTIFICATE HOLDER
I ADDITlONAlINSURED; INSURER LETTER:
CANCELLATION
Ci ty of Swmy Isles Beach
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAil ~ DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHAll
IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
REPRESENTATIVES,
AUTHORIZED REPRESENTATIVE ~ /f. ~
@ ACORD CORPORATION 1988
18070 Collins Avenue
Swmy Isles Beach, FL 33160
I
ACORD 25-S (7/97) 577025-2
11393277
USA
-
-8
CITY OF SUNNY ISLES BEACH
RFO FOR CONSTRUCTION SERVICES FORTHE HERITAGE PARK AND PARKING GARAGE
~ I ..m ffi!) ~ .) C3:!) ~'j I :.r.:.m
PE
BUILDER'S RISK INSURANCE
r:t....... ..,...........~. ~,'.E':.:V':.I.~ E...^N....'1$'E'u::~.~.'>.E.. !fp'<'<R"." 'iii."P"'E' R' . --m.,J'I"N""''''.S''U'!'''RA'v,< ','.;'N. .: ";C':E";.;,l,'.~.~.'.;,~,~f~~~~i~W,~:l,~.~<:~~,f;j8;' DATE IM_Dlnl ({
~~~~.-:c~~. t,,",~~V~~~MM<<~........v.,"~-...!~!~~----.~...~--~~.~~~..r' - ?)"~..l~~~~~ i~
THIS IS EVIDENCE THAT INSURANCE AS IDENTIFIED BELOW HAS BEEN ISSUED, IS IN FORCE, AND CONVEYS ALL THE
RIGHTS AND PRIVILEGES AFFORDED UNDER THE POLICY.
PRODUCER UPHONE 515-471-3954
(AlC.1to fxlI'
Construction Surety ana Insurance ServIces, LLC
400 Locust Street, Suite 300
Des Moines fA 50309
Mark A, Mallonee
COMPANY
ACE Fire Underwriters Insurance Company
CODE:
AGENCY
I SUB CODE:
11.'
IN~I'ED
IPOUC:Y NUMBER
121015076-001
EXPJRATION.bATE I r
! r--1 tO~TINUED U~TIL
'See Below ! I I T~R"I""leOIFCHEtKED
LOAH HUMBER
The Weitz Company, LLC
Capital Square
400 Locust St., Suite 300
Des Moines, IA 50309
EffECllYE DATE
06/01/2008
THIS ftEPLACESf'RfOR EVIDENCE DATED:
f'ROP.ERTY;INRORMATlON~~~m<,~~~~~.n~$~'Itt~<t~W~:~~~MWs:i~~~<i~m,~~;i...,i-i;.'~:l'''',,~illtiW~~iili\i~,~l':~~~t~);.~;
LOCAT1O>lIDESCRIPTION
Project: SAMPLE
Start Date: Completion Date: Contract Amt: $ Type of Construction: Non-combustible
. Expiration Date: Earlier of Substantial Completion or I
C()VERAGE.INF.()R"'ATION.i~r'~~lV,!~~~~==~~~bL~.llli~mm~nrmf~t,;~,*,.;:.~ "r~=~:~~:~~til~~:~ .
Project Limi' I Completed Value I $ 10,000 AOP
Builders Risk -" All-Risk" Coverage, Replacement cost with like, kind, & quality .
Flood, $25,000,000 occurrence/annual aggregate; excep' $10,000,000 occurrence/annual aggregate for projects in Flood Zone'" & V
Flood Deductibles: $25,000; except 1% VATOL, $100,000 minimum for Zone B/X~ and 2% VATOL, $250,000 minimum for one A & V
Earthquake: $25,000,000 occurrence/annual aggregate
$10,000,000 occurrence/annual aggregate for California & Zone 1; except $5,000,000 in Los Angeles & San Fran isco
$10,000,000 occurrence/annual aggregate for Pacific Northwest & New Madrid
Earthquake Deductible: $25,000 except:
2% VATOL, $100,000 minimum in Pacific Northwest & New Madrid
2% V A TOL, $250,000 minimum in All California & Zone 1
Coastal Windstorm: $20,000,000 for All Florida interior counties; with I % VA TOL, $250,000 minimum deductible
$20,000,000 for All Florida coastal counties; with 2% VA TOL, $250,000 minimum deductible
$20,000,000 for All other coastal counties from TX to NC; with 1% VATOL, $100,000 minimum deductible
$60,000,000 for All other windstorms; whh $10,000 deductible I
,'^,.. . o. in Transit Pronertv at a location other than the iob site $1.000.000 $ 10,000
.REMA~KS.(IiiClulllng ~~lal.~()ndwo.ii8m~~~~~~{~J:m;l~~illWj!~<~tt;illii~~~tii~i{{~fuIi~~;;.f,~
It is hereby agreed that (Owner) is included as a Named Insured under the Builder's Risk policy as respects work
performed by the named insured on the referenced project.
To the extent by the contract or subcontract for the project, and then only as their respective interests may appear, all
owners and subcontractors of every tier are recognized as Additional Insureds.
CANCEltATlON'If~~1W!~~~~~~WW)~~~~"~~~~~~~~;~;~~;~~i:j!~~~U~~~~iSl~'~~':;:~~~l,.~~~~lll!illt~~,~i~~~~s~;~~~~~.~t~1~
THE POLICY IS SUBJECT TO THE PREMIUMS, FORMS, AND RULES IN EFFECT FOR EACH POLICY PERIOD. SHOULD THE
POLICY BE TERMINATED, THE COMPANY WILL GIVE THE ADDITIONAL INTEREST IDENTIFIED BELOW ___60-___ DAYS
WRITTEN NOTICE. AND WILL SEND NOTIFICATION OF my CHANGES TO THE POLICY THAT WOULD AFFECT THAT
INTEREST. IN ACCORDANCE WITH THE POLlCY PROVISIONS OR AS REQUIRED BY LAW.
~..;=~~~R~!ltl.~':I;~~~;-;;mtlHOO~t;W~~~:~M~:r:i~~;it;:;,t~l;:::rW~:':~~;:::~:~~!M'.~~;J~~)%':;~i<i:;;.'fi'\!U;m~
lONa
(Owner)
AUTHOFtlttOREPREl5ENTATlW ~.P~~ - - -
"1' f{~ Mark A. Mallonee
):CORij'27;(3i93)~~~~~~~~ .~;m.;,~rmt~1,;m~oow.mr:m~"!~,Jl~;:;,iUm~';%~~:.l;~?>,.:,;~(;<i:;;:i.?l;; "{~l~irciAco-RO 'CORPOAA110N'1993
CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE