Loading...
HomeMy WebLinkAboutKorkat, Inc '" RFP NO. 09-11-01 REC DEe 0 2 2009 tOt06AM- cay 01 Sunny 1008 6oad1 fit) Office of !he CI Clerk PROFESSIONAL DESIGN AND BUILD SERVICES FOR A . SKATEBOARD PARK AT TOWN CENTER PARK PRIME CONTRACTOR: KORKAT, INC. SUPPORTING CONTRACTORS: SPOHN RANCH INCORPORATED / SKATE PARK DESIGNER O/LEARY RICHARDS DESIGN ASSOCIATES / LANDSCAPE ARCHITECT CALLAHAN CONSTRUCTION CORPORATION / GENERAL CONTRACTOR l\ IZ. i (, T tJ AI _ 1. Firm Qualifications Organization Overview Spohn Ranch, Inc. . 25+ years general design and construction experience . 15+ years experience in action sports element design and construction . Extensive fabrication experience in concrete, steel, composites, and more . Skatepark Association of USA Award for Design and Manufacturing Excellence . Licensed and Bonded General Contractor Product Liability and Professional Liability insurance ($11,000,000) . Auto, non-owned and hired insurance . Worker's compensation insurance . Woman-owned California corporation As the original builder of the X-Games and one of the first builders of municipal skateparks, the Spohn Ranch family has designed and installed over 425 skateparks since 1992. Firm Name & Address: Spohn Ranch, Inc. 15131 Clark Avenue City of Industry, CA 91745 Persons with financial interest in the firm: Kirsten Bradford 6130 W. 76th Street Los Angeles, CA 90045 Business Overview: Spohn Ranch, Inc. specializes in the design and construction of world class action sports facilities. Aaron Spohn 6501 W. 84th Street Los Angeles, CA 90045 Business Revenues: 2008 Revenue--$4.8 million 2007 Revenue--$3.8 million Mark Bradford 8319 Gonzaga Avenue Los Angeles, CA 90045 Damon Spohn 6130 W. 76th Street Los Angeles, CA 90045 2. Experience Over Previous 5 Years A Continuing Tradition of Excellence In the past 5 years, Spohn Ranch has continued the line of work it began in 1992 - building world-class skateparks for both community users and professional skaters. In the past five years, we have built over 300 skateparks - from micro-skate spots to national destinations like our recent Daytona Beach project. During this time, we've continued to experiment and innovate in our 50,000 sq. ft. concrete and steel shop. Our veteran shop workers (averaging 6 years with Spohn Ranch and 10 years in skatepark construction) have pushed design and construction methodology forward through the use of pre-cast concrete, computer cut templates for on-site concrete shaping and portable molds for casting pieces on-site. On the design side, we've kept in constant contact with all levels of skating through our work at pro-level skate competitions as well as constant feedback from skaters at our parks and at those managed by our associate company, the Action Park Alliance. We've also conducted over 150 community design meetings during the last 5 years where we take the pulse of skaters across the country. Currently, our design team is incorporating real street plaza features and skateable art into our skateparks. Seen as the leader in skateable art, Spohn Ranch has launched 'skateableart.com' to better educate cities about the possibilities of creating visually stunning spaces that please both skaters and pedestrians. Spohn Ranch's work has been recognized by awards from the Skatepark Association of the United States, the NRPA, the ASLA and Concrete Disciples. However, we believe that the more important recognition comes from the cities and agencies that have established Spohn Ranch as a 'sole source' provider of skatepark design and build services, including the US Navy. These cities recognize that Spohn Ranch's unique experience and breadth of capabilities offer cost savings and value enhancements that no other company or team of companies can offer. References for Selected Projects Over Previous 5 Years Project Name Role Cost Schedule References LA Skate Plaza; Los Angeles, CA 2008 10,000 sq. ft. Prime Contractor, Skatepark Designer, Skatepark Builder Estimate: $273,451.94 Final Cost: $273,451.94 Original Completion Estimate: 9.26.08 Final Completion Date: 9.24.08 Mark Mariscal 310.548.7643 Mike Shull 213.928.9195 2 15131 Clark Ave. - Industry, CA 91745 - P 626-330-5803 x203 - f 626-330-5503 - Kirsten@spohnranch.com Project Name Role Cost Schedule References Robert Bell Prime Contractor Estimate: Original Completion Nora Scherzinger Skatepark; and Skatepark $360,123.44 Estimate:9.5.08 505.897.0502 Corrales, NM 2008 Designer and Final Cost: Final Completion Lynn Siverts 11,000 sq. ft. Skatepark Builder $360,123.44 Date:9.8.08 505.899.8900 Richard Walton Skatepark Designer Estimate: Original Completion Luke Kowarsch Skatepark; Oakdale, and Skatepark $168,279.60 Estimate:8.17.08 651.257.6864 M N 2007 Builder Final Cost: Final Completion Bruce Anderson 10,000 sq. ft. $168,279.60 Date:8.17.08 651.257.6864 Daybreak Sculpture Skatepark Designer, Estimate: Original Completion Matt Mudek- Garden, South Skatepark Builder $150,000.00 Estimate: 6.30.07 801-451-7541 Jordan, UT: Final Cost: Final Completion 2007 $150,000.00 Date: 6.30.07 10,000 sq. ft. Original Completion Estimate: 6.30.07 Lea McKeighan Prime Contractor, Estimate: Original Completion Gary Welty- Skatepark; Lee's Skatepark Designer, $250,000.00 Estimate: 6.30.09 816-969-1532 Summit, MO: Skatepark Builder Final Cost: Final Completion 2009 $250,000.00 Date: 6.30.09 10,000 sq. ft. Westwind Lakes Skatepark Designer, Estimate: Original Completion Paul Carey-305- Skatepark; Miami, Skatepark Builder $267,000.00 Estimate: 6.30.09 755-7915,305- FL Final Cost: Final Completion 596-4460 2009 $267,000.00 Date: 6.30.09 14,400 sq. ft. 3 15131 Clark Ave. - Industry, CA 91745 - P 626-330-5803 x203 - f 626-330-5503 - Kirsten@spohnranch.com Project Name Role Cost Schedule References Homestead Skatepark Designer, Estimate: Original Completion Paul Carey-305- Skatepark; Miami, Skatepark Builder $130,000.00 Estimate: 6.30.09 755-7915,305- FL Final Cost: Final Completion 596-4460 2009 $130,000.00 Date: 6.30.09 7200 sq. ft. Dunlap Skate Plaza; Prime Contractor Estimate: Original Completion Mike Christopher Washington and Skate park $237,994.30 Estimate:12.22.08 717.762.3128 Township, PA 2007 Designer and Final Cost: Final Completion Jerry Zeigler 7,700 sq. ft. Skatepark Builder $237,994.30 Date:12.22.08 717.762.3128 Centennial Prime Contractor Estimate: Original Completion Brian Sullivan Skate park; Lemont, and Skatepark $199,613.54 Estimate:1O.7.06 630.257.6787 I L 2006 Designer and Final Cost: Final Completion 8,100 sq. ft. Skatepark Builder $199,613.54 Date:10.7.06 West Chicago Prime Contractor Estimate: Original Completion Gary Major Skatepark; West and Skatepark $134,976.92 Estimate:8.30.08 630.231.9474 Chicago, IL 2008 Designer and Final Cost: Final Completion Jesse Felix 5,800 sq. ft. Skatepark Builder $134,976.92 Date:8.30.08 630.231.7474 4 15131 Clark Ave. - Industry, CA 91745 - P 626-330-5803 x203 - f 626-330-5503 - Kirsten@spohnranch.com <t:Qtz (br Estimate Pt.AY(?;!.OUNV5f.l11.6S ,llN5tr.\Lt.ArlON 221 Cable Industrial Way Carroll ton GA 30117 Date Estimate # 12/1/2009 8467 Name / Address Ship To City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles, FL 33160 Town Center Park Skeateboard Park RFP No. 09-11-01 Rep Project KT Item Description Qty Cost Total OPTION #1 THIS IS FOR A PRE-CAST SYSTEM AND WILL INCLUDE A 15 YEAR WARRANTY Misc. ARCHITECTURAL & ENGINEERING SERVICES I 138,804.00 138,804.00 Misc. GENERAL CONDITIONS I 62,850.00 62,850.00 Misc. SITE WORK I 32,850.00 32,850.00 Misc. CONCRETE I 49,900.00 49,900.00 Misc. SITE ELECTRIC/LIGHTING AROUND SKATE PARK I 8,000.00 8,000.00 Subtotal 292,404.00 Permitting PERMIT FEES I 5,848.00 5,848.00T Misc. BOND PREMIUM I 14,620.00 14,620.00 Misc. OVERHEAD I 12,515.00 12,515.00 Misc. ADDITIONAL INSURANCE REQUIREMENTS AND I 13,092.00 13,092.00 GENERAL LIABILITY Misc. BUILDERS FEE I 23,197.00 23,197.00 Subtotal 69,272.00 Prices quoted are good for 15 days and are subject to total purchase, except for shipping which is subject to market changes. Installation prices assume normal soil conditions and docs not include rock excavation. Subtotal Sales Tax (0.0%) Total Phone # Fax # E-mail 770-214-9322 770-214-9323 mistyl@korkat.com Page 1 <t:Q tz <J::6r Estimate Pt.AYGKCAJM) 5P\1.6S J iN'".;>lr.\LtAriON 221 Cable Industrial Way Carrollton GA 30117 Date Estimate # 12/1/2009 8467 Name / Address Ship To City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles, FL 33160 Town Center Park Skeateboard Park RFP No. 09-11-01 Rep Project KT Item Description Qty Cost Total DEDUCT OPTIONS: FOR THE CITY TO COVER ALL PERMITTING FEES - $5,848.00 FOR THE CITY TO NOT REQUIRE BONDING - $14,620.00 FOR THE INSURANCE REQUIREMENTS TO BE REDUCED TO ATTACHED CERTIFICATE - $6,000.00 FOR THE CITY TO SUPPLY AN ACCEPT ABLE CRANE - $4,000.00 Prices quoted are good for IS days and are subject to total purchase, except for shipping which is subject to market changes. Installation prices assume nonnal soil conditions and does not include rock excavation. Subtotal Sales Tax (0.0%) Total Phone # Fax # E-mail 770-214-9322 770-214-9323 mistyl@korkat.com Page 2 <t:Qt< ~r Estimate f7t.A'(G,.~OUNV 5P\1.6S .l1N5tr.1LtAriCN 221 Cable Industrial Way Carroll ton GA 30117 Date Estimate # 12/1/2009 8467 Name / Address Ship To City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles, FL 33160 Town Center Park Skeateboard Park RFP No. 09-11-01 Rep Project KT Item Description Qty Cost Total ADD OPTIONS: COLLINS A VENUE LANDSCAPE TO MATCH NORTH PART OF TOWN - $64,000.00 COLLINS A VENUE PAVERS, CURBING AND SIDEWALKS - $19,650.00 KIOSK (10' X 10' WITH TICKET COUNTER)- $18,900.00 KIOSK (20' X 20' WITH TICKET COUNTER, 2 RESTROOMS AND STORAGE CLOSET) - $59,600.00 Total sales tax calculated by A vaTax ST 0.00 0.00 Prices quoted are good for IS days and are subject to total purchase, except for shipping which is subject to market changes. Installation prices assume nonnal soil conditions and does not include rock excavation. Subtotal $361,676.00 Sales Tax (0.0%) $0.00 Total $361,676.00 Phonc # Fax # E-mail 770-214-9322 770-214-9323 mistyl@korkat.com Page 3 ..~* ACORD ~ t::~~ Y'<'< ~'~." 5:14-$550 CERTIFICATE OF LIABILITY INSURANCE ro Box "Sf,; C.u:':"cll Lon ".!{l!\W ;~~.PCtPltllC NAICIiI GA LaJl-iu't' 2:~1 ?t.\0W Im~, DE:A.:: KO:::KJH::, :;:w:let>tr.l.lll !NS CO l'?$lJft CfLrro.Ll t~c~n 3iJU7 ,1,,\fl41n x- ;::C\WOlCM4 tb'\tMtir. A,- t<..V'<:, .$Ant ;.;; 4/ lSnt/Of! t ..vtO"Cti4f ljAVJJ1. 4,vy J}HlO 1,Otltl"O(J{i ,.. ,t;i -AttG%'\NtJJ-14JJtJ% iiUi\~l1~,~':. A:tjlpS lr~Wt3jn.hP~'t)$ x Ah)' Auro ilAltAiJ,t ....tHl.!TI HUff CeUtlCH@LC t.. ~Nbl.l$14-:2;o'l fi/;?i!2Q09 x tk~.?f iVf l;J!27/?Ctlt) CJ mVA!.\, _ Mn 10 tKH1C fi""l t, V<}U4tA, it'll A(It'im Lon .;i! IIfSllNlnl, HFf ,HHI <t:Qt< ~r Estimate FtI';Y(?;!.OUtoJP 5f.l11.6S ,llN5mLtArK)N 221 Cable Industrial Way Carroll ton GA 30117 Date Estimate # 12/1/2009 8468 Name / Address Ship To City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles, FL 33160 Town Center Park Skeateboard Park RFP No. 09-11-01 Rep Project KT Item Description Qty Cost Total OPTION #2 THIS IS FOR A POUR-IN-PLACE SYSTEM AND WILL INCLUDE A I YEAR WARRANTY Misc. ARCHITECTURAL & ENGINEERING SERVICES 1 151,000.00 151,000.00 Misc. GENERAL CONDITIONS 1 54,850.00 54,850.00 Misc. SITE WORK 1 32,850.00 32,850.00 Misc. CONCRETE 1 9,900.00 9,900.00 Misc. SITE ELECTRIC/LIGHTING AROUND SKATE PARK 1 8,000.00 8,000.00 Subtotal 256,600.00 Permitting PERMIT FEES 1 5,132.00 5,132.00T Misc. BOND PREMIUM 1 12,830.00 12,830.00 Misc. OVERHEAD 1 10,982.00 10,982.00 Misc. ADDITIONAL INSURANCE REQUIREMENTS AND 1 12,239.00 12,239.00 GENERAL LIABILITY Misc. BUILDERS FEE 1 20,409.00 20,409.00 Subtotal 61,592.00 Prices quoted are good for 15 days and are subject to total purchase, except for shipping which is subject to market changes. Installation prices assume normal soil conditions and does not include rock excavation. Subtotal Sales Tax (0.0%) Total Phone # rax # E-mail 770-214-9322 770-214-9323 mistyl@korkat.com Page 1 <t:Q t< <J::8r Estimate '(;'t.A'(G.Z0UNV5,~ :llN5mLt.AriON 221 Cable Industrial Way Carroll ton GA 30117 Date Estimate # 12/1/2009 8468 Name / Address Ship To City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles, FL 33160 Town Center Park Skeateboard Park RFP No. 09-11-01 Rep Project KT Item Description Qty Cost Total DEDUCT OPTIONS: FOR THE CITY TO COVER ALL PERMITTING FEES - $5,132.00 FOR THE CITY TO NOT REQUIRE BONDING - $12,830.00 FOR THE INSURANCE REQUIREMENTS TO BE REDUCED TO ATTACHED CERTIFICATE- $6,000.00 ADD OPTIONS: COLLINS A VENUE LANDSCAPE TO MATCH NORTH PART OF TOWN - $64,000.00 COLLINS A VENUE PAVERS, CURBING AND SIDEWALKS - $19,650.00 KIOSK (10' X 10' WITH TICKET COUNTER) - $18,900.00 KIOSK (20' X 20' WITH TICKET COUNTER, 2 RESTROOMS AND STORAGE CLOSET) - $59,600.00 Total sales tax calculated by A vaTax ST 0.00 0.00 Prices quoted are good for 15 days and are subject to total purchase, except for shipping which is subject to market changes. Installation prices assume normal soil conditions and does not include rock excavation. Subtotal $318,192.00 Sales Tax (0.0%) $0.00 Total $3 18,192.00 Phone # Fax # E-mail 770-214-9322 770-214-9323 mistyl@korkat.com Page 2 *" ~. 8.S o. -0. 0.. ~ .b V-I-V OVO};J-<>31V1S ..., Zz QO f-- <((f) f-Z (f)<( wOo a:x -w LL 401,&r.&oN Z o i= <( f- (f) W a: LL Z9 ::s~ a..;... Will I- ;i. -0 C/J(J) o ) '" .,; I "Ec:~c.i.. "'<:I 00<:1 C I ....:.c.-.-- j dUVJ(,) ~._Il) 0 ~ ....J~Cl ~ t o <! ~l ~ a: <( a.. a: w a: .... <( +-' Z OroW rn 0 W Z ~ S en ~ ~ a: <( a.. o [(b~\\1\ ~~ I~ (~~ ~ , ~ ..~ )l ~ o - E ~I 11 III . ;1 1;.1 =1 =- =, enE ! I I! I u.....'" ~tn..,... .,.aatQ aOtiiN CC"'Uc:i .."a.... ." co_ _ ..,. ... .... d; i!i ... -... . - I " a aD aD -' " " Ii &'ll fa ! , " a CD aD -' " ~ &'ll fa I! I i I i 'l:I ! 4. Schedule The following is a sample schedule based on a January 13th notice to proceed. Because of our use of pre- engineered skate elements, the permitting and approval process is typically much shorter than traditional poured-in-place construction. We were able to complete our recent skatepark design/build projects for Miami-Dade County on a very short schedule with a smooth permitting and approval process due to our experienced compliance officer and the quality of our supporting documents. Depending on the agency compliance required by the sidewalk widening along Collins Ave., this schedule may be adapted. The schedule also incorporates two public meetings conducted a Spohn Ranch Community Involvement expert to insure maximum buy-in by a stakeholders, including the owners and residents of the condominium building directly to the north of the park. Notice to Proceed - First Team Meeting- First Meeting with County- First Public Meeting- Second Meeting with County- Second Public Meeting - Third Meeting with County- Construction Documents Completed- Permitting & Approvals Obtained - Construction Begins - Construction Complete - January 11th, 2009 January 1ih, 2009 January 14th, 2009 January 15th, 2009 (Concept designs presented) February 4th, 2009 February 5th, 2009 (Final design presented) February 25th, 2009 February 26th, 200 March 15th, 2010 April15t, 2010 May 155t, 2010 15131 Clark Ave. - Industry, CA 91745 - P 626-330-5803 x203 - f 626-330-5503 - Kirsten@spohnranch.com 5 6. The name, title, qualifications, experience, and all contact information of the proposed contact person. During the contract negotiation phase of the project, the primary contact person will be Kirsten Bradford, CEO of Spohn Ranch. She will continue to be personally involved in the project as it passes through the planning, design, construction and close-out phases. Kirsten Bradford, CEO/CFO - Spohn Ranch Skateparks Kirsten Bradford is the CEO and CFO, taking care of the legal, accounting, and contracting aspects of the business. Integrally involved in the action sports industry since 1993, the breadth of her experience ranges from the construction of high- quality permanent facilities to the management of nationwide televised competition tours and the operation of national retail locations. Also, as president of the Los Angeles chapter of the Entrepreneurs' Organization, Kirsten leverages her knowledge of business best practices to ensure the success of each and every project Spohn Ranch undertakes. Her extensive experience with liability issues has been vital in collaborating with insurance brokers and underwriters to develop programs specifically for skateparks. Through a number of municipal projects, Kirsten has become adept at assisting the various city departments in smoothly achieving their goal of developing a successful skatepark. Kirsten's contact information is included on the footer of this page. 7. Other Key Project Personnel Skatepark Designer & Community Involvement Specialist Aaron Spohn (Spohn Ranch Skateparks) - With over 30 years of involvement in skating and actions sports, Aaron is a pioneering figure in action sports. Founding Spohn Ranch in 1992, he began to design and build ramps and courses for high profile skateboarding events. Aaron worked with ESPN to develop the X-Games concept; designing and building structures for the competitions. Aaron is well known as a top skatepark designer, with glowing recommendations from professional athletes like Tony Hawk, Danny Way, and Paul "P-Rod" Rodriguez, Jr. His recent design for the LA Skate Plaza in Wilmington, CA has been lauded by Transworld Skateboarding Magazine, Thrasher Magazine and pro skaters across the country. 15131 Clark Ave. - Industry, CA 91745 - P 626-330-5803 x203 - f 626-330-5503 - Kirsten@spohnranch.com 6 He was also a consultant to the 1996 Atlanta Olympics tribute to extreme sports and is a member of the ASTM subcommittee establishing guidelines for skatepark construction safety. Aaron has spent considerable effort promoting the industry as a whole and sharing his extensive knowledge. He has been an editorial contributor to Athletic Business Magazine, Landscape Architect and Specifier News, the National Park and Recreation Association Magazine and other industry trade magazines, was editor of 60 Tricks skate magazine, and has been a speaker and session leader at the National Park and Recreation Association Conference as well as almost every state Park and Recreation Association. Working closely with Hays and the rest of the project team, Aaron will translate the skaters wishes into engineered 3D drawings of an amazing skate plaza. His knowledge of current skatepark design and the most famous street spots in the world means that Sunny Isles' plaza will have the best of tested skate elements, as well as the latest obstacles and themes. Aaron has performed similar work on seventy skatepark projects of comparable size and scope (above 10,000 sq. ft. with a budget above $350,000). During the planning and design phase, Aaron will spend an average of 10% of his work week on Sunny Isles' project. He will speak with Hays and the project team weekly about the project, averaging 1 call every 4 days. During construction, he will spend less than 5% of his week on Sunny Isles' project, coordinating with Hays to make sure that all work is on- budget and on-schedule. He will not be substituted as skatepark designer without the City's approval. landscape Architect Kathryn O'Leary Richards (O'Leary Richards Design Associates) - With over twenty-five years of experience as a Landscape Architect in the South Florida area, I Kathryn has extensive experience in working with municipalities and State Agencies I and has worked on several high profile projects. She provides continuity and J coordination through all phases of each project, from initial planning through design, bidding and construction. She is an advocate of quality design and dedicated to the highest principles of professionalism. She has been the lead designer for a multitude of successful municipal and private projects for Sunny Isles over the years. .w Other Key Professional and Managerial Personnel of the Proposer Team Member Role Number of Skatepark Projects Mark Bradford - Spohn Ranch Construction 160+ Doug Hagen - Spohn Ranch Logistics 70+ Damon Spohn - Spohn Ranch Design & Drafting 100+ Kirsten Bradford - Spohn Ranch Compliance & Legal 200+ David Tripoli - Spohn Ranch Cost Estimating 45+ 15131 Clark Ave. - Industry, CA 91745 - P 626-330-5803 x203 - f 626-330-5503 - Kirsten@spohnranch.com 7 Mark Bradford, COO - Spohn Ranch Skate parks Mark Bradford is the COO and head of the construction, installation and logistics divisions at Spohn Ranch, Inc. His responsibilities include the fabrication and construction phases of our projects, including the mapping out and executing of the physical site and transportation elements. He is recognized as an industry expert in value engineering and cost-efficient skatepark construction methodology. Mark has built over 150 skateparks and major installations across the world. His clients include Red Bull (North America, Mexico, Australia, New Zealand and the UK), Boost Mobile, the Hard Rock Hotel and Casino, Paramount Pictures, the East Coast Surfing Championships, ESPN, MlV Sports, and the Warped Tour, among many others. Doug Hagen, Logistics - Spohn Ranch Skateparks Doug Hagen has an extensive operational background with over fifteen years of hands-on experience in action sports construction. From our home base, Doug coordinates all aspects of the project, including subcontractors, logistics, personnel, and equipment. In addition, he makes sure that all of our parks are well serviced and maintained after the point of purchase so that our clients' investments stay in great shape for the long haul. Doug has a broad operational skill set, including trail building, pipeline install and repair, trenching and shoring, terrain park design and construction, and welding and fabrication. He has experience running various types of machinery including front-end loaders, dump trucks, tractor-trailers, forklifts and snowcats. Doug has managed over sixty staff members and coordinated with event producers from the 2005 Winter Gravity Games, USASA Nationals, U.S. Telemark Nationals, Nor-Am World Cup Qualifiers and USSA Grand Prix for premier events. 15131 Clark Ave. - Industry, CA 91745 - P 626-330-5803 x203 - f 626-330-5503 - Kirsten@spohnranch.com 8 8. Warranty Damon Spohn, VP of Design & Engineering - Spohn Ranch Skateparks Damon Spohn is VP of the design and engineering divisions of Spohn Ranch, Inc. In addition to being a licensed California general contractor, he is an expert with Mechanical Desktop and AutoCAD. He prepares the layouts and coordinates the permitting and stamping of construction documents for our skatepark projects. A skatepark designer for over 10 years, Damon has created concepts, final designs, and construction drawings for many high profile skateparks across the country. The inventor of many oftoday's standard skatepark elements, Damon keeps his designs current with ongoing skating, research, and collaboration with today's top skaters. David Tripoli, Cost Estimator - Spohn Ranch Skateparks David brings 14 years of cost estimating experience to his current position at Spohn Ranch. For 10 years, he was a senior estimator for ValleyCrest - one of the nation's largest contractors. He's an expert at estimating site work costs, assessing materials and construction methods, as well as performing quality control to insure that all proposed work meets applicable standards. Spohn Ranch will provide a 15-year limited warranty on all pre-cast skate elements installed. This means that the most specialized, expensive elements of the project will receive the maximum protection. This warranty replaces any defective pieces for the first 15-years of the park's life. During the first 5-years, these replacements will be completely free to the city with Spohn Ranch bearing all costs. In the ensuing 10-years, the only cost the city will bear will be the labor to install the pieces. All other flatwork and hardscape will be protected by a i-year guarantee of work. The expected lifespan of the pre-cast skate elements is 50 years with virtually no required maintenance. Because the pre-cast elements are insulated from ground by an air cavity, the riding surface of the park is not affected by changes in the underlying soil. This is particularly important given the mangrove area adjacent to the park. During the wet season, the soil beneath the park may expand with moisture. This will stress a traditional poured-in-place concrete park and will lead to cracking and weeping of water through the cracks. Another factor that will expand the lifespan of Sunny Isles' park is proper use of metal edging. Traditional poured-in-place construction struggles to properly integrate metal edging along the grindable surfaces. This is why these traditional designers often use curving and sweeping forms instead of the right angles that skaters prefer. By incorporating steel edging into the mold during casting, the 15131 Clark Ave. - Industry, CA 91745 - P 626-330-5803 x203 - f 626-330-5503 - Kirsten@spohnranch.com 9 metal is always perfectly integrated. This lets skaters grind away at the metal while leaving all concrete protected from wear. 9. Full listing of materials to be used in the construction of the skateboard park facility Pre-Cast Skate Elements: o Concrete · Construction Type 10 Portland Cement Max. %" aggregate Mechanically vibrated up-side-down in precise concrete mold Pre-cast indoors off-site at least two weeks prior to installation Cured in temperature- and humidity- controlled environment · Characteristics Min. 6000 PSI, Max 7000 PSI compressive strength @ 28 days Slump: 2-3" Air Entrainment: 3-5% o Reinforcing · #4 rebar steel reinforcing @ 16" o.c. grid steel reinforcing (D) · X" welded wire mesh (WWM) steel reinforcing @ 6" o.c. grid (J) · Synthetic Macro Fiber reinforcement (K) . ASTM Cll16 standards · Minimum cover for all reinforcing shall be 11/2" o Finishing · Surfaces (L) All pre-cast elements must transition to the slab without the use of transition plates Riding surfaces hand-finished smooth after concrete sealer applied Non-riding surfaces primed with a two-part graffiti-resistant epoxy primer and coated again with a two-part polyurethane coating · Joints (M) Hand finished with cementitious grout o Steel · Grade 304 Stainless Steel anchored at 12" on center with steel studs Round Coping (N) o 2 3/8" Schedule 40 with seams and end caps welded and ground smooth, as required Square Coping o 2" x 2" X 1/8" thick plate with seams welded and ground smooth, as required o 2" x 6" X 1/8" thick plate optional BMX Plate (0) 10 15131 Clark Ave. - Industry, CA 91745 - P 626-330-5803 x203 - f 626-330-5503 - Kirsten@spohnranch.com o 6" X 1/8" welded behind the coping (optional) Grind Rails o Rectangular - 3" x 2" X 1/8" thickness o Round - 2" diameter Schedule 40 o Fitted with welded end caps and ground smooth o 2" diameter welded steel tube vertical supports are cast into the concrete during pouring or anchored using stud-style interlocking wedge anchors Concrete Footers that Support Pre-Cast Elements: . 4" slab with min. 6" thickened edges . 1% slope for sheet drainage. . 4000 psi concrete . reinforced with #4 bar, 16" o.c. Grid.--min. coverage of reinforcing shall be 1.5" . 8" min. rebar stub outs . finish can be broom or something of the like. This applies to the footer slabs only! The pre- cast pieces will sit on these and cover the rough finish. This rough finish is not acceptable for the skateable flatwork. Please see that spec below. . curing method-let's discuss. . control joints where necessary-either cut in by hand during finishing or saw cut the next day. Width of joints must be no larger than 3/16" Concrete Flatwork: . forming . 4" slab with min. 6" thickened edges. . 1% slope for sheet drainage. . 4000 psi concrete . reinforced with #4 bar, 16" o.c. Grid. Tied to stub-outs from footing slab. · placement of a self-adhesive rubber expansion gasket on the pre-cast components prior to slab pour. The rubber gasket is provided by us. · Finish-hard steel trowel until all visible pours are closed (cease trowel before gloss forms on surface of slab). · The two Upper areas should be poured on a different day than the main area. · Main flat area-pour in one day is preferred. If necessary to pour or over two days, utilization of keyways to ensure smooth finish and bonding between pours. No felt expansion materials or the like may be used between pours. . curing method-let's discuss. · control joints--either cut in by hand during finishing or saw cut the next day. 8' x 10' grid. Filled with highway grade caulk (Silkaflex), same color to match natural gray concrete. Width of joints must be no larger than 3/16." 11 15131 Clark Ave. - Industry, CA 91745 - P 626-330-5803 x203 - f 626-330-5503 - Kirsten@spohnranch.com SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted 00 The City of Sunny Isle~ Beach by Shane Lanier for Lanier Plans, Inc. dba Korkat, Inc. whose business address is 221 Cabl~ Industrial Way Carrollton, GA 30117 and (if applicable) its Federal Employer Identification Number (FEIN) 86.01063618 (If the entity had no FEIN, inclUde the Social Security Number of the indJvidual signing this sworn statement: 2. I understand that a "public entity crime" as defined in Paragraph 287. 133(1)(g), Florida Statutes, means a violationo[ any state or federa1.law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivisionM any other state or of the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivisionbf any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, coHspiracy, or material misrepresentation. 3. I understand that "convicted" or "conviction" as defined in Paragraph 287. 133(1)(b). Florida Statutes means a finding of guilt or a conviction of a public entity crime, with of without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1. 1989, as a result of a jury verdict, nonjury trial, or entry of a plea of guilty or nolp contenders. 4. I understand that an "affiliate" as defined in Paragraph 287.133(l)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity come. The teETn..."affiliate" includes those officers, directors, executives, partners, shareholders, employees, members,. and ag~nts who are active in the management of an affiliate. TIle ownership by one person of shares constitutingacontf6l1ing il1.terest in. another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shaJI be a prima facie case that one person controls another person. A person who knowingly enters into a jointventure with a 16 person who has geen convicted of a publi(; entity crime in Florida during the preceding36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes, means any natural person or entity organizedullder the laws of any state or of the United States with the legal po\ver to enter into a binding contract and which bids or applies to bid on contracts for the provision qf goods or services let by a public entity, or which otherwise transacts or applies to transact busineSs with a public entity. The term "person" inclucies those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 6. Based on infomlation and belief, the statement which I have marked below is true in a relation to the entity submitting this swam statement. (Please indicate which one (1) of the following three (3) statements is applicable.) -X- (1) Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, paltners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime witJlin the past 36 months. _(2) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,shareholders, employees, members, or agents who are.active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(3) The entity submitting this swomstatement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or agents who are active in management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Divisiol} of Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the public interest to place the entity submitting this swam statement on the convicted vendor list. (Attached is a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FORTHE PERIOD OFTHE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNQERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE CATEGORY TWO OF ANY CHANGE IN THE INF.O O~ I'J::~~N CO A.INED IN THIS FORM. ~~n._ Shane Lanier SIGNATURE OF AFFI (Printed or Typed Legal Name of Affiant)i 17 STATE OF FLORIDA ) )ss. COUNTY OF MIAMFDADE) regoing Form was acknowledged before me t,llis '7 day of !)-e c , .2009, by ~ I~ , as ... f r<.r , ""- + of r' Florida corporation, on behalf of said corporation and limited partnership. He/Shepersonally appeared before me and is Rersonally known to me. ~~~.. { NOTARY SEAL} ~1 Pit", MICHAEL WILLIAM CALLAHAN JR. ~ ..v, . mr MY COMMISSION # 00581153 ~~"",i EXPIRES: Aug. 3.2010 OF~ S' m (407) 39B'()153 Florida Notary """ca.cO Notary: Print Na Notary Public, State of Florida My Commission Expires: 18 NON. COLLUSION AFFIDAVIT STATE OF ~FLORIDA COUNTY OF MIAl\l1-DADE The undersigned being first duly sworn as provided by law. deposes, and says: 1.1. This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said City, in any consideration which may give to and any action it may take with respect to this proposal. 1.2. The undersigned is authorized to make this Affidavit on behalf of, Lanier Plans, Inc.. dbaKorkat,In~ame of Corporation, Partnership. individual, etc.), a corporatioI) duly organized and existing under the laws of the State of Georg ia of which he is .-O.Yln..e.r (Sole Owner, Partner, President, etc.) 1.3. Neither the undersigned nor any person, firm. or corporation named in above Paragraph 1.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this proposal by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. 1.4. This proposal is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 1.2 has not colluded, conspired, connived or agreed directly or indirectly with any Proposer or person, firm or corporation, to put in a sham proposal, or that such person. firm or corporation, shall refrain from Proposing, and has not in any manner, directly or indirectly, sougqt by agreel11ent or collusion, or communication or conference with any person, finn or corporation, to fix the prices of said proposal or proposals of any other Proposer; and all statements contained in the proposal or proposals. described above are true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 1.2, has directly or indirectly submitted said proposal or the contents thereof, or divulged information or data relative thereto, to any association or to any member or agent thereof. Shane Lanier AFFIANT'S NAME Owner AFFIA."lT'S TITLE ~ 19 .... /-sl- Th~loregoing/Affidavit was acknowledged before me this~ day of /)e~. ,2009, by S/}..IN~ ~t-'lr- .. ......, as Prert c(A.-!- of ~)~ f , a Florida corporation, on behalf of said corporation and limited partnership. He/She personally appeared before me and is per nally kno\'ll1to me. { NOTORlAL SEAL } ~.".y pv+_ MICHAEL WILLIAM CALLAHAN JR. .., 'J!/;jr' MY COMMISSION # 00581153 ~..B "'J'l'OFI\.I:l"" EXPIRES: Aug, 3. 2010 (407) 398-0153 Florida Notary SarviCG.com --;--- Notary: Print N NotaryPubli6, State of Florida My Commission Expires: 20