Loading...
HomeMy WebLinkAboutAddendums Addendum No. 1 CITY OF SUNNY ISLES BEACH Design and Construction of Canopy Structure at Heritage Park CITY RFP NO. 11-04-02 To All Bidders: Bidders for the above-referenced project shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise. ~ The construction budget for this project is $110,000.00. END OF SECTION Addendum NO.2 CITY OF SUNNY ISLES BEACH Design and Construction of Canopy Structure at Heritage Park CITY RFP NO. 11-04-02 To All Bidders: Bidders for the above-referenced project shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise. 1. Wednesday, May 4, 2011 - Pre-Proposal Conference Summary Minutes and Sign-In Sheet (attached). 2. During the pre-proposal meeting the Clerk ascertained that the pre-proposal meeting was not advertised as "mandatory". As a result, any and all proposers submitting a proper and complete proposal in accordance with the RFP# 11-04- 02 will not be rejected for not having attended the pre-proposal meeting. All . proposers will be required to comply with the requirements of the RFP# 11-04-02 to be considered responsive. 3. The question was asked as to the number of stage lighting fixtures required as part of this project. Previous response during the pre-proposal meeting: 3 or 4 per column. ADDENDUM: A total number cannot be ascertained at this time; however, based on the input of an exterior stage lighting expert the quantity and size of lights as well as location shall be determined. See item #3 below. 4. The proposers shall provide an "ADD" Alternate as part of their Proposal which shall include any and all the elements of the electrical design, permitting, coordination, supervision, construction, and installation of the stage lighting and all electrical connections and components associated with this project. Vendor shall INCLUDE the cost to hire a stage lighting expert (approved by the City) to assist both the vendor and the City during the design process to ensure that the proper lighting and controls are provided as part of the project design and intent of the project. The stage lighting expert shall consider, among other things, the type and location of the proper stage lights (Le. whether- on the horizontal support structure or on the vertical columns) and provide input and suggestions to the proposer and the City during the conceptual and design phases of this project. In addition to the cost of the design of the electrical, the proposer shall include the cost of all associated design modifications resulting from the City's review as it relates to the determinations and input of the stage lighting expert. It is anticipated that the City will determine the inclusion or exclusion of the "ADD" alternate at the time of contract negotiations with the successful proposer. The total cost of the "ADD" alternate shall be clearly indicated by the proposer. 5. The amount of liquidated damages shall be set at $700.00/day. This amount was not depicted in the RFP as posted. 6. Related Heritage Park Project plans on PDF will be posted on DemandStar as will the single DWG file for the stage area. Copies of the prints will NOT be provided to the proposer. END OF SECTION