Loading...
HomeMy WebLinkAboutCross Construction Services, Inc. o a II c II II II a o II ~ Cardinal~ OneStep~ @llRilD Index Templates at cardinalbrands.com 1472276 Proposal Information for IFB# 11-07-03, Professional Demolition Services for Multiple City Properties For City of Sunny Isles Beach, Florida \\ 0 ,~ (II 'elbl(1/+ Company Information RECEIVED Qualifications AUG 1 7 2011 \ti\)~ ClJ,..cr Su.r.ny !.~I€:;. 2ez:ch .! Staffing Approach I Methodology Price Proposal References Schedule Contract Forms c QUALIFICATION INFORMA TION FOR DEMOLITION SERVICES, ASBESTOS & LEAD ABATEMENT & CHINESE DRYWALLjMICROBIAL REMEDIATION c c CROSS CONSTRUCTION SERVICES, INC. Asbestos License #CJ C056725 - Certified General Contmctor flCG C 1505176 25221 Wesley Chapel Boulevard, Lutz, FL 33559 813/907-1013 - 813/907-0297 Fax c 25221 Wesley Chapel Blvd. Lutz, Florida 33559 Phone: (813) 907-1013' Fax: (813) 907-0297 CROSS CONSTRUCTION SERVICES, INC. CROSS CONSTRUCTION SERVICES, INC., offers contracting experience and expertise at a significant value. When in need of asbestos or lead abatement, indoor air quality, general construction and demolition services, you can count on the quality, performance and reputation of Cross Construction. We offer clients: 0 0 C 0 0 0 0 0 0 0 0 0 0 0 Experience in contracting since 1978 Longevity - Oldest, continuously ~perating asbestos abatement company in Florida Quality Management (in place since inception) Outstanding Safety Record Over $6,000,000,00 owned equipment and vehicle inventory custom designed specifically for demolition, asbestos and lead abatement Consistent, well-trained and certified workforce Strong compliance safety program Superior liability program Vast experience in general construction Value Engineering analysis Complete and total demolition Interior/Selective demolition Drug-Free Workplace Cross Construction Services performs hundreds of abatementlremediation and demolition projects per year. After you review the following information we hope you conclude we are the "right" company to perform contracting services for you. c (;. CI c.) ) 25221 Wesley Chapel Blvd. Lutz, Florida 33559 Phone: (813) 907-1013' Fax: (813) 907-0297 Office Location and General Information Cross Construction Services, Inc., is a certified asbestos abatement contractor and a certified building and general contractor. CCS is located just off Interstate 75 in Lutz, FL with a 20,000 SF office/warehouse. We opened our second location in Panama City, FL in April 2008 to serve the Gulfcoast and our neighboring states. Both offices have specialized equipment and inventory is housed at each location. In April 2009 we opened a satellite location in West Palm Beach, FL office to serve south Florida. CCS can mobilize all environmental and demolition projects from both locations and work the entire southeast United States. Russell "Rusty" E. Arney, PresidenUOwner (e-mail addressccsrusty@aol.com) and all project managers can be reached at our toll free telephone number 866/907-1013 and fax 813/907-0297. We coordinate our projects according to EPA regulations, project size/crew size, equipment needed, etc. and can mobilize to emergency situations in a matter of hours. All of our management and supervisors are manned with cell phones communication equipment and are available 24 hours a day. Project Manager contact information: Anthony Hanson, Vice President Tyler Lillibridge - Vice President - Demolition Services Skip Johnson Zane Gilmore Pete Swyryd ccstha nson@verizon.net ccctyler@verizon.net ccssjoh nson(cQve rizo n. net ccc~ilm ore@verizon.net ccs pete(cQverizon. n et ~ OP 10: MB ( ACORD CERTIFICATE OF LIABILITY INSURANCE r DATE (MMfDD1YYYY) '-.---- 02/28/11 I THIS CERTIFICATE IS ISSUED AS A MATfER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES ") BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. .. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsemenl A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER 813-226-1300 CONTACT NAME: Brown & Brown of Florida, Inc. 813-226-1313 r~N~o Extl: I FAX I CAlC Nol: P. O. Box 15519 E-MAIL Tampa, FL 33684-5519 ADDRESS: Joseph W. LoPresti ~~~~~~~~ 10#: CROSS-2 INSURER(S) AFFORDING COVERAGE NAIC/! INSURED Cross Construction Services, INSURERA:Zurich American Ins. Co. 16535 Inc., Cross Construction INSURER B: Steadfast Insurance Co. 26387 Company, Inc. INSURER C : 25221 Wesley Chapel Blvd INSURER D: Lutz, FL 33559 INSURER E : INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: ( THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE t~g,ll~~1 POLICY EXP LIMITS LTR r..~o W\In POLICY NUMBER MMlDD1YYYY1 GENERAL LIABILITY EACH OCCURRENCE $ 1,000,00[ - A X COMMERCIAL GENERAL LIABILITY GL0586754906 03/01/11 03/01/12 ~R~~;SES ?Ea~~~~~encel $ 150,00( - :=J CLAIMS-MADE [K] OCCUR 10,OO( - MED EXP (Anyone person) $ PERSONAL & ADV INJURY $ 1,OOO,OO( f-- 2,000,OO( f-- GENERAL AGGREGATE $ n'L AGG~EffiE LIMIT APnS PER: PRODUCTS-COM~OPAGG $ 2,000,000 '" POLICY X ~~g LOC $ .,I AUTOMOBILE lIABILllY COMBINED SINGLE LIMIT $ 1,OOO,00( f-- (Ea accident) A ~ ANY AUTO BAP586754606 03/01/11 03/01/12 BODILY INJURY (Per person) $ ~ ALL OWNED AUTOS BODILY INJURY (Per accident) S f-- SCHEDULED AUTOS PROPERTY DAMAGE $ ~ HIRED AUTOS (Per accident) ~ NON-OWNED AUTOS $ $ UMBRELLA LIAB ~ OCCUR EACH OCCURRENCE $ 5,000,000 - X EXCESS L1AB CLAIMS-MADE AGGREGATE S 5,000,000 8 iSE0586754806 03/01/11 03/01/12 - DEDUCTIBLE $ RETENTION $ $ WORKERS COMPENSATION X I.WCSTATU- I IOTH- AND EMPLOYERS' LIABILITY TORY LIMITS ER A Y/N WC586755106 03/01/11 03/01/12 1,000,000 ANY PROPRIETORlPARTNERlEXECUTIVE D EL. EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? N/A (Mandatory In NH) EL. DISEASE - EA EMPLOYEE $ 1,000,000 If yes, describe under EL. DISEASE - POLICY LIMIT $ 1,OOO,00( DESCRIPTION OF OPERATIONS below B Pollution PEC586754306 03/01/11 03/01/12 Ea. Claim 1,OOO,OIX Liability Aggregate 2,Ooo,OIX DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule. II more space Is required) See "Cross Construction comcanr' Cross Construction Services, Inc.- Certificate Attachment" dated -1- 1 attached CERTIFICATE HOLDER CANCELLATION BIDPURP (,: "Bid Purposes Only" clo Cross Construction Services, Inc. 25221 Wesley Chapel Blvd ILutz. FL 33559 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NonCE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE hl....,,_ 10....<11'.......; ACORD 25 (2009/09) @ 1988-2009 ACORD CORPORATION. All rights reserved, The ACORD name and logo are registered marks of ACORD c c c CROSS-2 INSURED'S NAME Cross Construction Services, OP ID: MB CROSS CONSTRUCTION COMPANY CROSS CONSTRUCTION SERVICES INC. CERTIFICATE ATTACHMENT ~ NOTEPAD PAGE 2 DATE 02/28/11 Coverage Form Generar Liability coverage form CG0001 applies. Additional Insured Certlncate Holder Is a General II a b III tv, Pollution liability Additional Insured and an Auto Liability Designated Insured, when required by written contract Primary / Non-Contributory Additional Insured Primary and non-{:ontribufory General Liability Additionallnsu red proviSion applies, when reqUIred by written contract. Per Project General A.Jjgregate Ge.neral Liabilitv Per P'roject General Aggregate applies when required by written contract Contractual Liability General Liability ana Auto liability Insured Contract contractual liability provisions apply. Separation of Insureds General Liability and Auto Liability Separation of Insureds provisions apply. Waiver of Subrogation Waiver of Transter Of Rights Of Recovery Against Others To Us provision as resgects General Liability, Auto Liability, anij Workers Compensation applies in favor of Certificate Holder, when required by written contract Excess Liabill~ UnderlY.ing Insurance Excess liabilitY schedule of underlYing insurance includes General Liability, Auto [iabllity, Pollution liabinty and Workers Compensation Employers Liability. 6-1-11 C~ IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ..... " c: ACORD 25 (2001/08) c c c Brown & Brown of Florida, Inc. Post Office Box 15519. Tampa, Florida 33684-5519 813/226-1300. FAX 813/226-1313 @ December 23,2010 To Whom It May Concern: Brown & Brown of Florida, Inc. is the Bonding Agent for Cross Construction Services, Inc. We have placed their Contract Bonds since 1992. Cross Construction Services, Inc. qualifies for a bond line consisting of a $3,000,000 single project limit of a $6,000,000 aggregate. Western Surety Company, the Surety, has an A.M. Best Rating / Financial Size Category of A, X (02/08/1 0). They are listed with the Department of Treasury to write bonds up to $54,720,000 (07/01/10) and are licensed to operate in Florida under a Certificate of Authority. Cross Construction Services, Inc. is in good standing with Western Surety Company. We value our relationship with Cross Construction Servic.es, Inc. Please let us know if we can be of further assistance. Sincerely, --wW;~ 11vU#J Mia Bush Account Manager o State of Florida Department of State I certify from the records of this office that CROSS CONSTRUCTION SERVICES, INC. is a corporation organized under the laws of the State of Florida, filed on July 12, 1996. c The document number of this corporation is P96000059139. I further certify that said corporation has paid all fees due this office through December 31, 2011, that its most recent annual report was filed on April 14, 2011, and its status is active. I further certify that said corporation has not filed Articles of Dissolution. c Given under my hand and the Great Seal of Florida, at Tallahassee, the Capital, this the Fifteenth day of April, 2011 ~o Secretary of State Authentication 10: t0020t838271-04151t-P96000059139 To authenticate this certificate,visit the following site, enter this 10, and then follow the instructions displayed. h ttps://efile.sun biz.org/certau thver.h tm I c 25221 Wesley Chapel Blvd. Lutz, Florida 33559 Phone: (813) 907-1013 . Fax: (813) 907-0297 AC# 4 5 7 94 2 8 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION ASBESTOS LICENSING UNIT SEQ# L09091003539 LICENSE NBR 09/10/2009 090113131 ZA0000282 The ASBESTOS BUSINESS ORGANIZATION Named below IS LICENSED Under the provisions of Chapter 469 FS. Expiration date: NOV 30, 2011 CROSS CONSTRUCTION SERVICES, INC. ARNEY, RUSSELL E. 25221 SR 54 WEST LUTZ FL 33559 c CHARLIE CRIST GOVERNOR DISPLAY AS REQUIRED BY LAW CHARLES W. DRAGO SECRETARY '. -.'- _ ' '. - ":'~":.'~'{:;::~::-,:;,,":'"''::'':i','',:,:';,'' ....>. ,':"~:'..<_:; -,-,_~__,..,," :.:'y.v:rt~"'1~~- , ,09' ;,,1.=9/'20.:1.0: 1:Q,012.0,863'hCJ~'o.;5 6~~,2).5(~!.-<;:.! ::~~':~: ';{/~' ;-'~:':'~~:I. r~~~~il~~j .. ;~i~~1 "-".-.ii' ~!;~i'g~q,; ~~1fj~J) . '~fi,li:f~) tf~~f~~~ril {~~~~~l~~~~~~i~;f~[ -';(/iRl.~n?LAY;~~S.;g!fPUI RED>13X', LA w.'c j'0:'~?,'.:;t;?: ";,::'::" ',".- ':'.:.::'r/Y) .-:.:' ";.: c 25221 Wesley Chapel Blvd. Lutz, Florida 33559 Phone: (813) 907-1013' Fax: (813) 907-0297 AC# 4. 4 4 0 8 6 0 STATE OF FLORIDA . ..". . . . . ", . . . . . DEPARTMENT OF BUS-INE'SS:'AND PROFESSIONAL REGULATION " 'CONSTRUCTION~:INPUSTRY LICENSING 'BOARD . .. ~ SEQ# L090615(}0527 06/15/2009 080520546 ", B0016405 The BUSINESS ORGANIZATION Named below IS QUALIFIEP ".: Under the provisions Of Chapter 489 FS. Expiration date: AUG 31, 2011 (THIS IS NOT A LICENSE TO PERFORM WORK. THIS ALLOWS COMPANY TO DO BV8INESS ,ONLY IF IT HAS A QUALIFIER.) CROSS CONSTRUCTION SERVICES INC 25221 STATE ROAD 54 WEST LUTZ . FL 33559 CHARLIE CRIST GOVERNOR DISPLAY AS REQUIRED BY LAW CHARLES W. DRAGO SECRETARY c 25221 Wesley Chapel Blvd. Lutz, Florida 33559 Phone: (813) 907-1013' Fax: (813) 907-0297 ~C#. '::..:.. _. . - ',' '." ':': ", . <::':-:...;'.>'::\.:,:~~;:\';).'::.:.:>~~;;: '.<',.2':~::;.:- /::Y)/(':.\ '<\~\~..'/:,:,::'.""~'. .)::;_ <:.. '.,:' ,'.'. '.' '.' ..:. " .'. ~:IA ~~Q 41f'll,6, 0- 46 .~~,t~~, ... . !4;,,-~ .: .9W.,t' ::'.:..!$t~~' SJ~~rJ;;i&.], .f'[~QB..IJ::U~'J \.,,,;"":t'.::' :.'";':,_, :;.:!:i;;~ .'l~\!:;, '. ~i:,','" __ ..S)~.' .~"~ ::;t',~,.t. W'~ &~r. -~'f.f;tJ'\;'$kb:"'j,~' 9$~'ft~1t,.i,\: .:.' ;~;P};,["'l:WJi~::,4,(*}}~~r;f<.~~ ::;y.~}"~$~YGJ~{:,J '.~~\'~ .'.~)t;j-.jiJ%-:"l~f!~"':,f~~W~"~'2~(~~~~ .'...-<.g~t i~9!i.lt(~' '!(W':t?<)~~, .;'~;.%: ~ '~,hi': \~~f ~I,:r.. ~,I~ "N;:::' ~~",~:OEIBARml~f&1Nrr-fWF""Ir6''S::t'N@l:;,S':;<roID' - \~\I~<:li~-Es~smoN~L r-r.~'Egl:J,L'fi:mION1\~ ;;;1-j' \\~::;!:. -$i\.;~ :~11:t \Ii ~~J~T .-i~~,".::ki~i'Iiif1.l '.;>;~)~.: J~7_., '~:'=i,:M<D'IDD'~E"tj~mEB''''''S-;m' v- ;:eES'.!:.~1EGE'tJS'jIN(S~.1p\'inG,'R.J(M1.@" . iJj~&,~ '.:/b{t:'; '.E:I)t>\(~~; ~~1ls)~!.' c.;'. ~~~; :j@W:.i :~l~f :~M~~.~\::,:~':' )~~lt]fl!W: :'tX~{~-WJ!i'fi.":EIID.: ~"..\ ~ '.', :. I ~)I~L\? :~.n\\~ltt)~rt.: ~~J:J}m~:ff)f.', :', ,.:'~g,~# .Ill~1\Q..21t~'O~?'4;~ . '".;,-,..-:..-"'" ,-.r.~""., ", ~--~ ',~ '~-'~ ", ,.... - ~"'f:#fi~~~:~j:~~~ili ~~~y, '::~f!?;~.ii,::7f?~t~14iti:i;~t:;\;{;~;;~f.C;',::;:- _.::,'. .:}~~:;..~!~::,'.:::~~:~; '>. ~.:.~:-: ~ ," .., ....~.. '....\.. .... ,""--_'.~. ''''--~l. r...,.,.....___,..~.:... .............. ~:1.~ _.._lo~,.~ ".~"':~' I.\~_.,..'.. _. .~_ ,", 0' _, .. . ~1; . ~t; i{a::)Jtli!l''i H' .' .:a'ci:~2i4:''':2.~i&~, Mil~JR'4~~~~f~ ~~. ~~N: ;;~&.(t}jfu~~:)'; ;~15j;~S~~':!.~ ~:'.: ~~~~;. --:'?~Y:~~f.:J1':~I,_ '?J.i:?i ~ ~J~'h \'~~'.' ~"~. . \!.?" '. . 0\.;1 Jr.. '~''J.i.;''R''''.,'!:~~ntjl;..>T''''-\\l:l:'l:..: . c=: ":i~- ,,\:\'(, ~'~r,;~\'" .'/X1-:'-f ..I~I!.. ~~"iW. 'i~;t. . . ~;~)~l, ~"',; I.,~-, 'r~W~ >~:>~ r.~ ..t~,'L'~e :, (i;I:r..DJ~R l:1w;A!!!1:Jt ,: '~Y.- ;I'-~'~' ,,:r~IP.$.' \ , -=-: . I:.:.: \;,:0:1:)1 ,,-'_1,:~~; ,~.~" :"":~l . 'f:;\~~~' . ""'~',~ mt? ,l@~" $i\1,~: .(]tjr;- I" ".';;';:;,'\'''''''' ,..../~l'l':1.....~>:;I:J".: ..~.::r.~" ~ 'g'T'''I'''i5: ."~;,,;:~i.,>\,,,.\' . ~,\. '" .:: . \~H"€d ",:,~';'tii' f%i7;i1..'*'>~ ,'~~}\''-'' " ~'\'H{;' 'l'!""'~ ,':---:.',1 '_1'::_.,:~('j: ,r ~...\~~ 'ame"~P~ -too j" J r;o- j ~Y -\~ .';..~I ~o; t" . "<:"/~ - -I\l'--~\ ~ "~~--' .l',..}:!iiJ,r.. -;:;.Q ;,.; ,,ok.::- .!F,tf....--....;; --'jf -' "'-=-' "'J~'-iJ.~ .-.\.... II!' -(~ : "d" -:~)*,FllI",i;,! ,_~C~:i:;/~"''''-'' '.A'"~!il-"'C;:'h',:.~I~I~, "-.,:' =~.~ Vir1i'~R~.i,,*,Y. '(f,~)1 [@(~~ii', . \l~1& '..'~;r~f;$)T ~:,~ 'J '-, n er>~'ene' v<)~ ~on/3' 0';&"-- a.B;15 .~. ..-......r:J%, ''-'-'" '" ~" v,";. ~..,.",.'-~' ""::;--__ :~, ":~:~f~~f~~F~~.~'if.r;~X;,::'1Yfii~::~:~;i:~~:~~;,t~ ~~t~"::if:~iY<)",~~~}:.:,i~~\":!'", ~~:...,.~~~~..,., ~_~:: .~~.: ~ if/:!" @If:, &l@~i~;:~@ ;~!~l@'i.:.-\: ~I~::~iJ,~,,,j@!~, l,.~) :l~~(~f:fl~Ji/!~Ll:'J';f~h.- i~~91 '~(f 6~~t{~~1,:;, ~~ ,I ~(~. t(~r ..~.~~\.~ :<'~""'.'i' ,;.';;::-~,~:f}i '1"-" (:;;' -'N~~r-fJi;\l?,';,,,,'-:;f~~:O:'i 1-b, ..... ~.. ,:r-:~f(' :~;FP. J~~)}. '.[~{ ,.:,,'iP~. .. ~~~,~ :~JJ!/ Ir.:;,~ :1<)I;""~" :~(';, ti .')<' ""?"~' \ . ':RN"[;1, -1~, ,'0', :;:s,'&'" "~.E-"', ,2,,"" ,~~,,,,,,-. ",/" * tl, ,.,,~,,':. ""'",,;:> ,~" .-..,;\, _1.:1,.1:.. .~,'~..~..,,-, 11'1'''' ~~l' -'('jli: '" . ;it,)" . L:l. ,r" ,;Q; ~"A_... ,....~ '" ,J.,'~ ,M.~." p' "~.~ "',":"'" b ,I; "~'~i ;;:;\ 'i-:' .,." ~:;:;<: ",,"'''' ~~", '~"" I"~ l 9:'" :.n:'~'l.~i''1* ~.e :I11e."JIj,,€HAF c1:.iitI'BL, ,I " " .;_~~~;~~tA~ 'T:~ A /0, ' . '!g_.' \-0 ~ )*-10". ,1;\'!t-)'j. ~t:;a"'~JIi:.t:. ..' 'F:J.f~ili\';, '. 'i;..-!H.c' ,:&}ji... '~1~(,1' r.. """"'~";. ~~".,~, ..~~, ':'o,-ifiJ=f.r.'. .~-I." ... .."-..............~?-..,, ""'. 4(i'~:' !''If".......-.:..t:-..~ ,..."'.... ~~,~ ....--~i." -:'..~:r:"~"""'" r.'~[~' ".'"ti'~ " '.' D'j'JllUZ."{" '.: '~)!(~J~C):t{Gi'f,~ ('.:; . ".'~~\I*'.'..Fr.t~:I:3~~I.?)? }~>,,>'r.ii}./DJ ' r, " . ~~~t :: ' ',~,!I.'~~l~):t'j.:,,:: '(~)': !:::t~?'t, ' .,' "!,'t)w I,' ..'l~(~''t(:{,'P t:t,~ \~ '. .', "::..: : >.>.',~-, ':;:., :::,.-:,;:;:-: :":<;:'.'::.' ~;' ,::. ',>~~;':~:,'::,'+\::.::;',::}~;f'\?0+f~~i';:':\~: :::.~~~:,; :..:..\ :-;;:":':"),: '::." ('" :: ,f:::,'., :,::. ," ,;' "",,: '. .. . JW':' . ,tff':'" ,;f.fr~!!'4\\'.' ...:~~~ . *l}l:ni~,"-, ':- ~!:'t. ',: ~,)~.h.:' ~~~hi:' .;'; ,)~:-!! ":i?I,tt:l'!j,-.,'"':".'/ :~:.: <}j":!! -',. ~~'. ~ :.;.;;{(i:.f.Ji:(;,': ,f~J):; !~,(~/...;~ . , . t~::;r..)~ . ~A.~, _.ri1;i1,:\).~~,> .' .&J;~ r; @& &W; ~!$:;~~~:.~I~~' @t~~@:(~, ~:'~'~!~(:iliWYii~~tf:m', d~!&l.m~z~(i:\?i:ID1:;~@f,;-.~~f.'\1@'.I;'~i.;g9] t'@/~~~'~..: W} :~lf ~[{? :'~)2, .~~Iif l ~:!?_j~~f.', ~~1.t,: . ''RI/<.-~ ~~'~S'},-f'6x:i1~~11!1: ';<J~~l~:~V,:. ~if~~),::; Y&'Y~: 2},~I' ~y.~o,] (J~?:'; ", ,:;:~~\(j~i,t.? ~f~f~,~:', QTI~ .~)\ f.~~ ~fJfr.r!AR';r...;;rE~tL I;~-f::.f ' ; ~'~~~I;; 9~fI\,&t II,: !)~p" ~'~I:,! '-:fl' ~ t~~-n~'''*h:. .'"'t1;c"<:\' ",r.I~"..,\i1'~IJ .;::\I\~,~ 1O!~-;~?-:(<;' .' ....?,;;)la~ \ .(;'J.I,I!_~~j;:;;,'~1 .C:I;)'-':<\!A ~rHo"j,(~ ,..~;a. ... .~;;= 1/. , ;~:IIJ.);'f~' ". --' ~!2j,\1!.~u..:: 0. V{~~'(I,!jI~~ ; , :,> ~U ,\;;1::;),". ! :,'."':t~'-'l;;;j~~d;r-(o;' - ~~ '; ~,~~' ';!j;' "', . .., 'i:{~;~',' '. ;(':".:j~~)k~r;. ;'U~}Jni:%{@.)Ii:> ~ ~.lf~;lI'~R y "~..5.\A(*l" i1i.~ f; '~"'" . ""'"1.i"'(? "l'"",\rr-,.~,'U'",l_."..., '--",""" '-"r=,8ISRIiA"t/l:o",t:QUIREl:hBYLAwY-:i,..,.....,.-".Nl'.-.."".."-,,... ~"";" \....,...........;;- '.,:;v,'- , ' ".'\...,'.,.r.',. -..} :_, ,.,',' _'~r"..':.I....MI...r.:~.:..I~.',',~ >41(': ,..,,1....'....01.1-<......... 0, "._' ;I;...,:....l.:+~ ~." ':"'. \ ..h....1I 11.....'.. " c c 25221 Wesley Chapel Blvd. Lutz, Florida 33559 Phone: (813) 907-1013' Fax: (813) 907-0297 ;'A2ii~9 Q 9 C29 . ". ..:.... !fii\::\{:23''',.~~:,.,)p :\'::: .:~:::';:::';!f,. ,:,/,-:,:'::\:: .: :;:.:;:~~ .:S~~J~;g~, FL9,~I~~~:'.:, :j".:::.=.,:-'.,:, '.: _,~,,:;~~:,~ _ ),,~.::'.X~2:"" ,;,. ,',_ .' " ';<i;~+,:';~<:~ ,;~;-:':~' ';;:.~ :;:;:. \~(:'DEPARTMENTOF BUSINE'SS ':AND ,PROF.ESSIONAL f:REGULATIO~,:Li:[i: ~.';;?l{(\~:;:,~;,;i<:;::.' :~)t~i;~~7:'. :<~::. " o.~C:.": \:)~, ',!;;i{~/,~~F,~:'; '..~~~:t;~8?NS~~y:~,~:Ie!~W'ffi~B~TR~:;;~B7 C~~7~.~g' ~~~~;;}:;~r?';~,~9#.Lt(f~.~o~'o of; s ..':' - FICENSE;:'NBR.:;~r::~;(:::;> .. I~;:}::.~..:;:.:~ :CROSS',: CONSTRUCTIbN:';BERVTCES, INC:.: ">. ,.C' ~M~'l WESLEY'CHAPEL:B~rnK.:G59: . ;:.:.'.: .". ....-... 1\4\:, jc), ",'::.:.,j~: . =.'~.;...'.".;.'.:.",_'.:.;:":;"..:.".,:::;':..~.',:,:_.:.'1/ ;>>C}iitRL:~;~: '::CRIST ,'," ',' " :c;;;;:::: ).GOV~RI;'P'R::::.:' .-:',. .".'. '. .":." . ":-.:.' ~'. .--:.... ..; . ,- ,. . . ".;'~:";~'." '. '.' . . , .' "" ;'-~'_.. o.~.' "'~"" l~~~"~;'~:.'-::),::.'~.,; o. . .' I,. <,'. .-:. .~' ,:..' ~''-:;:.::';o . _. '-.. . . .. . , ':~'.:~.f.: :.::f.... /f.:-:~ : ':. . : ,'.'__' . t':--. - ,:. :,:. .'. ::::.~ .:. ::...:.:~ ~ . _: :-.;'. ,'.,' ,.__ _. :':,;6i~p~AY A:S::REQUIRED~B'Y LAW\' :j~;>:'~ Po '. . ". ..r;~ , ;~:~~f?~ "':+':J': ..,"'~!'-.::' :~::". ~ii~~~~~~~~~iX! c , . " F'.PASCO~~~~~E~~2ow:n-'.~-' lsslJOO purs1.lt\t~t eM slIbj.ect to FlOrtdS. SHHutas Fif\(.! PawJ County OrdinanCfi$. Issullllctl dO<l$ not ctirtlfy campllanca with zoning or othe( In'.'1'5 This fecnia! must Of! posled c..'lOspiClJously in pisC'a of bus lOSS!!, Expires SopiOmoor 30. ,-.... -...J CROSS 25221 lUTZ TA.X COLLECTOR ~dU~~~ PASCO ('OeXTY FLORIDA ,~" ': ;iN.'~' ~ -.~ f I>"':. CONSTRUCTION SERVICES' IN ,// '~t~~.." STATE RD 54 W :' ~ t : FL 33559-7201 :. ~ f ; ACCOUNT NOI 040752 SIC CODEr 1541.01 , . t "~ ..~ N...... ..' 1IIlII"nltlllllllllttllllllhhUlI.ill"'III1"II~lIdlatlll.l " . ",. ' ' -~~~E:l'V~IRr.::~T v- Q1~tl~-""-'~~IDIH Jr MllI'lIIIl5\\Ar.a!ill$l'lflt.1-AQ:1fll!' ~ I Ctms:r~l!t'1''''l'mVl1' ,tF". c TYPE OF BUSINESS I ASBESTOS CONTRACTOR lOCATION ADDRESS: 25221 STATE RD 54 W lUTZ I i DATE RECEIPT AMOUNT 08.112/10 591748 65~ 00 ~ ~r r::rrw TTr W' .......~ ~'1fr I" ~~r'V ~_Ii1'IN, r r T .. PASCO COUN1"'Y USINESS TAX, RECEIPT 2010-11 Issued purnu8nt and sublOO to. fl.nrld41 StatlJll}s l!lnd Pasco County Ordinances. ls~uance dOlt$ npt cartUy compliance viith zoning 01' other 1a'A1;, Tht5 f~cetpt miJf1\ be POSted conspICUously In pLaco of busloosn. Exp1tf.ls September 30. . ACCOUNT NO: 044523 SIC CODE: 1541 T.AX COl..LECTOR TYPE OF BUSINESS I ~~~ BUILDING CO~TR^CTOR ~~~-~'"'.''V'~~~~W1r . mlr.r.M""-""'W ~ : :n:r ff "'---';'IV'~\l:i.l.l:il!'~~ y 'W-I'Illi~~~':'t -___.._.._.._..._..._.._..._.__~__.._~_._~.._..__.__.__..__"_'_.~"."~' ,..... .~. ,.,N _....~.._ ._......... ._.______ ~_ , L r (.-, " ~ I i ,I, lOCATION ADDRESS: 25221 STATE RD 54 W LUTZ II I I "Arm"::. ~1 r. 1 m"3~ 3 .lI DATE 08/1V10 RECEIPT 591747 AMOUNT 76.25 ~ ~ :.:._~ ~~ == ~::..~ ~ ':'~;;', ~:.;,; '~~'lr,IM;:Q,~~~w'~ ~.,_~__~~.__ PASCO.COUNrry BIJSII\TI~SS TAX ECEIPT 2010-11 ~ IS5\J('~ Pi.lfSlJMIl.lnd &ubjact to Flo1id~ Stmul.ilS aM Pasco County Ordinances, Issuance d~~, not certIfy ccmpllllnca with zonlog or olhellaWll, Th!s rttCtllpl mUllt t,e DOslilt'l cOMp.icuo\.lsJy In pineo of busine~, Expite<a Sepli.'lrnb~H 30. ACCOUNT NOI 023242 SIC CODE: 1795 a:~~~t~~', ./ ..... .~_-~'~" .~~4\: IN l;:' /;';;ft;~ ...',."-;-.. .\. ~'_: :- Ltl:~L:~~ _~t\i\~. ','. _..'t....;~.,w. 'l. . ~);. C..~~~ ~:~> ~: ! ~ ~J ' "\ \..' ~ i/ft/ J' '~\~~~:i;:f-(' 1,,11" IlI'"IJ.llnl''' /"1111111111111111 I. 11'1'1111, '1'11'1111 CROSS CONSTRUCTION SERVICES 25221 STATE RD 54 W lUTZ Fl 33559-7201 TYPE OF BUSINESS: DEMOLITION LOCATION ADDRESS: 25221 STATE RD 54 W lUTZ I. j ~ ~ ~ ~ rn " '! S i: DATE RECEIPT AMOUNT 08/12/10 591746 56.25 c Cross Construction Services, Inc. License Florida Asbestos Florida EPA Lead Florida Building Contractor Florida General Contractor Alabama Asbestos Alabama General Contractor Georgia Asbestos Georgia Lead Kentucky Asbestos South Carolina Asbestos Arkansas Asbestos Mississippi Contractors Mississippi Asbestos Ohio Asbestos Texas Asbestos Contractor c c CJC056725 FL-1889-1 CBC059838 CGC1505176 0193339 44358 70NF111730 1007082310 C09-448-1 CO-00301 000499 1803-SC ABC-00002111 AC1989 800960 Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active c ~ t...f ~ ~ ~ ~ =t Q ~~ ~ t.,.q ~ ~ ~ ~ ~ c ~ $~ ~~ = ~ a ~ o ~ ~~ ~ = ~~ ~ ~ ~ tt:S ~ ~ ~ ~ ,,*=<~ ~~ ~~ <P=* ~ c ~......t ~ ~ ~ () c - Cf) Q) o .~ Q) ~,. C." o f5 ::l ~.:.:. Cf) C o o Cf) Cf) o L... O. ::n ~ .~ ~ ~ e.t t..f Q ~--l- t\1 ~~ tr~ ~~ ~ s u ;j "0 I:: o o o - I:: ,9 ~ o t,::: '-E Q) o "0 Q) ;> '~ o Q) .... '" cO ...c: "0 . 1::\0 cO ('.I .('.1 ,.-...,.; 0-q- '2'(-- N~ ~p... I::~. O~. '+:lU ~o r.I)-q- '^"O' .' <:.:;:: u@ r.I) ....., E-< .... .... '-'.. U') ';-0 is o p.. <: '" ....... Q) o ",p .jj ...... - ;>. ......... 0...... u.g Q31:: 0'- I:: cO cO p.. -"0 '" <l.l .g '" r.l)15 O.-d '><' cO o <l.l E-<....... Q) ...c: ..... 4-.. o .. . ~ Q = b .~ ~ t..Q "~"'" 10' tn ~~ ~ :: ~~,: ~ ~ .'~ ~ ~ '" ..... I:: Q) S Q) .... '3 cr" Q) .... Q) .s "0 Q) i2 :2 '" cO ...c: .q ..- J:: U C m ..... co CJ) (l) u c m - CJ) .0 :J U) U 'x o I- "0 C m CJ) (l) "0 '0 m ~ "~o... Q) C :J J m "0 .C o LL '" Q) .... 'a >< Q) "0 I:: cO Q) o ~ cO ;j '" .~ 4-. o Q) ~ "0 Q) .s s o <t1 :"S! '"@ ;> ,~ ~ .9 ~ o t,::: '-E Q) o '" :.c: E-< .....1 ...,". c........ (:.::.::. (~'.1 1--' 1.,,- C) CJ 'l:I: ~ ~ ,8 (J) ~ ~ ~ ..- '-E I <l.l u: U c: o "0 <l.l ;:l '" '" I Georgia Envrimnumtal Protection Division c UmmSl:l Io ~~n~!mt ~eyuJ3te~ t\snf1stm~ Af]thj~Ues in Cemsa~8 . . "'$~~~~}{~" . ,j,?"':'9.r-.. .~;: i:/:.'~ t j;'J.. ,~." ~'J,~';i'f;:;<-,0)~I, '1~"f,'~:(:f:;.,f~ii;'f?)\<~;'~'\ ~I,bn,~",'iTI- ,:,.!,t.;~, ,. , n':'':)' t'. I:r""""''lt. ~ .I;.~..:.'.",... Ef.ii'~';;''''< '. \~f.~:f~ff~i ~ [i~ig_~f.1~~~rg ~~p~~ ~m~~ nq,lhr.N1frr,!{ ~~i!1!ilPftlm i.n-r;",,,~ ;.n,f]'Jl.4~ t r4.t1hi~P... i:..l~r;U t:aeJ~liut.JfllU't.:.'J "H 1,;....iYl U!7.i G1JrmiG~1lfm, i\mjr~tl!tati!J!i, liGermiHy Unit Carol A. Couch, Ph, D., Director 4244 International Parkway, Suite 104 Atlanta, Georgia 30354 I:~!i.~~% ~",,"('';)''''-H' ,.,-.!.1.,. :.-.,F ."..-"",.., Wrt:.....'!: (""";t:\" ~i1""'" l! i~~~~:[~.~~~l< I . , Cross Construction Services) IWC. Having satisfied the requirements of The Georgia ..\shcstos Safety Act,O.C.G.A. lk.n-l, ct scq and the Rules for Asbestos Removal and Eneapsll!ation, Chapter 391-3- . .14, Is Hereby Licensed as an ASBESTOS CONTRACTOn , . . , . ." To HCIllOVC and Encapsulate l"dablc Asbestos Containing Materials '. Wi.thin the State of Georgia. This Certificate [VIay Ht, Subject To Reyocation, , Suspension, Modificatioll Or A..nwudmenl By The Director For CauseIncludillg . .'. Evidence OfNoncomp!iancl~; Or For Any l\lisrcprcsentationMade InThe Application,Supporting Data Entered TIH~f'{:in Or Attached Thereto, Oi. Any . ' Subsequellt Submittals Or SUppol"("illg Data; Or Any Aticrations Affecting The Ability To Prrform Duties Prop(~rly. Company Owner/President __._____._f3us?ell E.~rn_~y____ Company Mailing Address c 25221 S. R. 54 West Lutz FL 33559 PluJ//e: (866) 907-1013 FAX (813) 907-0297 E-Mail Atltlre,\'s ccsrusty@aol.com Compan)' License Number . 70NF 111730 Principal Agent's Name .______._.___________.. RusselLArney___ Agent's Date of Birtl1 5/13/1963 Agent'.I' Heigl1t 6 Ft. 2 III. Agellt's Weight 220 Agentrs Authorization Number 805914730 The Company License and the Agent's Authorization are intaconnected, and the issue and expiration dates run conclll'J'ently. The issue and expiration dates shown below apply to botJz tJze Company License and the Agent's Authorization: ISSUE DATE 11/14/2008 EXPIRA TlON DA TE 11/14/2011 (; Issued By: Digitally '~d by DAN.... HUGHES DANA HUGH ES ~~:~~~~~=;~~C~:':~Orify R..Son; t Iml~ ~ do<:Untl"ll ((n.1~2OOe.1l,~n~OQ04IH)5~ . \./ ..,I.'l'< (, . . :".." l' ..'L".'_.(.--f i . / /,1'" ' , i"l; . ... '[-'I C:l. .-iIJC~ .",.' Phone:(404) 362-2704 aljosie Jarkins@dnr,state.ga.us Print Dlite Frida)', NOI'l'l/Iber /4, 2008 ~ c ~ .~ ...... .~ ...... .~ ...... ~ ~ .~ ~ ~ ~ ~ ~ ~ "'- ~ ~ ~ ....... ~ .~ =: ..... ~ ~ .~ ~ ~ ~ ti .~ ~. ...... ~ ~ ~ ~ ~ ~~ .... ... ~ :::: ~ ~ ~ ~ ~ ~ .~ ..... ~ ~ ...... ~ ~ ~ ~ ~~ ....... .!;: ;:." ~ ~ ~ ....... ~ .,,:::: ~ ~~ ~ ~ G>"'"l :;.. .~ ~ S'o ... ... ~ ~ -~ ~ t:i' ... ..... ~ :: t::: ~ ~ ~ <u ..... ~ ~ ~ "'~ ~ - i:: ~ c:q c ; ~"l:::~ ~~'" ! ..... '" ~ ~...;:: .... , '1::i ~ C) '"ij ':;:: :::; i t:"'~~~":;:'';:: ! ~~..,..<:.J:::::-;~ I c::< ~ ~ t: ~ ::::.tt I '" ~ ~ ~ ... i:: ... '. ~~~.~C)~.g '" '" ~ l.tl .S :u :: i .......~ ~ ~ ~ ~ Q., ~ ~ ~ .t: '" C) ~ "'" ~.::?.;;:;,:::""'''' ~ "'~ ::tf:'-<o~ ""l~ ~~~ . ..:::: &.... ~ ?\ ~ ~.~...... ~ ~ t: l.:i<"'li:;O~:::"'~ u0~~l.tl"Sti c)......~\j~~~ '" '-- .... t::.... .... I .....~ ""l (S' C) ~ .::: :::; <:.J.... <.:- <:.J r, I ~~~;::~~'-' .... '"' ~ C) .::; g ~ ..;:;-.............~- .~ ..::: Vj ~ ~ '" ~ -:::: \j ~.!;: 9. t: ~ ti:i ~;:: ~ ~.C).g; ;::.. ::::: ~ ~..;::.. ...'" .~.....:::: ~ V) t::1}: ""'" ........::::"-.; ........~ -..t::1..~"'""'::~~tU ~ ~ ::: ~.~ ;:..::; ~ ..:::~t'.)~~~~l::U ~ b.~ ~ .~ t: t~ .~ '" <:.J...... _.... ~ .~""-l ..... ~ .~ .,S ~.... 'i::: '" ~ _~.........("'I"tu..- Q.,'1::itit:~:-'\.,)'::;: "l::: ~ ~ ~ ~ ~~ ~ h ~ ... 0;; .... -:::: ..... ">. ~..:::::~.........~~ ""-l .Si'c:i .... .S ~ ~ "l::: .~ (:i Q., :: ~ ~ ~ ~ ~ <:.J '1::i .. .... ..... \:> .... .... t.. '" .C) t:: 'i::: t:i C).~",.:::~C)Q"" ~.....t::t::<:; t:\:> ~:u~~::::~C) ~ u ~ !S..~ ,::: '" ~ t::1 "'r;::: ~....J t') h~",C)~....>:::i ~ ti:i ""-l ~ :::: C) C) E :::: ....~ ~ ~ ~ ~ ~ ::: ;S ~ ~ ~ ... ~.s>..... ,",.-:;: '" ~o.C:)~~~_L... t:"'<: '" t:.... t: ~ .~:::~~~~:S ::t ..... h ::t <:; -" '" c::<,.,~.....Vj ::>.,-::::::; tu~"'" :;::" Cl::"l:::~~~~~ '" ~ s..~ .... c::< ..:::: c:J ~ ~ r~ ~ ::: ;; ~ r~ <:.J ...... ~ .~ ~~,-,C)....::t(:i ~~~~ ~Vjt~ '':::~ ",Cl:: <:.J ;:"~ t:: .... C) :::: .. 'i::: Vj...~.....t::"<:'" ~.:;......ti:::::~\.,) .t: ",.::? ,'" ~ ~ . ~~""~,,C)::>'" ~ ::: :::: ::t 3 ;:; 'I:: ....... IV .!::'~ .... .... '" ..... ..... Cl:., -" .... '" t:l.. .:;: .... C) oc...h.... 0... ;~~/';, .'(~(:;:;" .~". f ~;:'; ~,,:.~i.:: .....:~ ~ ::.:~~::-': .r.,. '.... .,~ '-;"~ ":~> r.:....... .~ I , i I .. i I ! ..... - ~ ..... .'" ~ ~ .... t:: .~ t: ..::: <:.J 0:-- ~ ,,;' ~. ~ .... ... \.~~ ~ .~ ;g, ~ oj ~ ......~ ~ "l::: ~ ~ ...... i . I.... : i~; !~ I~ I I ~ I I.~ I ~ I ru 'l:t: ~D t:: ~ (:iN ~ <:::> ~ '" .,.,~ ..... ~' ,: ",' "<:l t; ::: ~ ~ ..... Q '- ..... :t c "'tl <1) 0 ~ rn ...... Vl ---.. ~ ,.....; M Q) ,.....; en ..... ........... 1tl --- ro H ........... t- ...... 0 ro M 0 'Q H I-ltH S ,.....; . 0 ---.. Z ~ ~ (J:l C\1 t- ~ Cl S'"8~ 0 ~ ro ........ <( '" b.I)""d <e: 2 C'ol'.I .5 $ ~ :a: ~ cu i:\j c.J ~ 0 0 ~0 . P'OI . . Cd Cf.) !1.) 0\ ~ , ("1j d ~~. +-> c1 ~ ~ 0 .s M 0 m ~ -..;::f"' .~ rLJ. o ...... lZl 0"1 ~ ~ -l=ol Y ~ (1) ,.....; M ~ = en . >-l ..!:l ,.....; .-< ~ 0 o 8 ...., ~ ~~ ~(:.U c < .""", V":l T 0 W I;'.l ~ 1.1) . .- Z ~ ~ ..D'"@ en C Ua ~<' ;S = en C -+-i C ~E-4 .. ro 0 c: 0 0 ~ ~ <l) ...... El ...... <Z <l) ~ :> -H ::1 tj U ro___ t) W ~~ 0 OZ'>--4 E3 0 ~ I- U 1.1) 0 t:l.. ...... ;.... ..c: "-' t:: <J: ~Z lI".l +-> ...... (),) +-> ~ o ... ~ u ~ i- 0 Q ~B 0 (),) " ~ -o\jcn --< ~ B en U ~ ::1 -- 0 (!) ~ N 2 0 ('f) on > ...... --0 ,.....; ~ ro ~ cIj '-' ........... c ~ Z o -- cd r-- ~ -C :::S ~ 0 ro ~ .!.oJ b.O B~ ~~tC ~ t~ q) cd~ U'l ~ o..ro ~ ~ (),)~ 0 Q 1.1) d) > . ro ~ .- ',S t) t\i 8 ~ ~ 'S: tj..j w --.... ~ -<W c va / Hl 39'v'd NOI18nlSNOQ sSO~J 8t>EVEL6ET8 E1:91 8T80/GT/L0 JifiJ iii BI I!j 1:1 III III JJri1. II a ~ c c c co Ul M "l'.>-'J "l'~ O~ Z'"'"' f.:j ~ L4, Z !cT.l (j :J ~ ?. " <C ~ .e:., <(~ co <: ,.,..'} .,I".t <.:I., -::-~~'\~.:t:.l-. ..dj!.; ~c..\..Qn~~ ~v." .- ,,~ v7C.t,: . ->&% '.. ~~. ....\\' 'J''''('' .'-, ~{(c \i :.t\B il,'''- P: '~w ~~'\\'r..l kJI.i..:' ,~,~'".;\ i';1F ~:::7t~i. ~ <,.;-1r.~ ;.~~~~~~~ ~1-1 r~') ,~"" [.1,) I'~.-~ <t: r"i (.I) .t.:, j.:, ~ 1:-' 1-, ~I ..... H t=;! "'" t:. "'" .~ ~ z: ;::J o ~ '< ...J r" ::; en m ~ ~\ ~'=t U iZ$ ;4 ~}=: ~ Q ~;) -. .".-t ......-.? J..y ~t ~ tc..> .H ~ , ~ ~ ~~ tt ~~ ~;~:t ~~~ ~ '=t .""-,'\'tI ~1. C"t"'U t::;() ...'=-~ ~ q=; t~ pll .pi e-~ i~~ H,.;; ~;=.l t:~\.., ~ ~ ~ ''-~ tfJt 0 CO '7 ...... LD < 'U ..q 2: 0 Lf) ~ 1'~ -. .~ LD -< .... 0 '7< 0 U ..c: ........ ::l ~ :,IJ or. ~ 'f-..; [-., r.:"l -<l; ~ E-=~ ~'-;:=r '1'~.J ~ CI... i-....,~ F-~ '::. ,.J f''', >-'- p;,:j C) o t-' .~; ~~ ,.~ ,......*.,.,.",[:1 ii:'~9.;~'~ ~:.~ ! :-"~1 .~ -~~"~if';1 t"" , '\, . r;;; fi~1 "0' ~~ '. :..\ ?": :t.". i (::;t~~~ , .""'j ~~\:..,;:~~:; ( ".'i"};';..!~'V lif0J "~;'""'~ .? J. i~~ft~ ~~: 'j ~. _~ :'Jfo.f,,)-~, !~.<;0.?:;y~:.. :, -,;;:;:%~ ~ J '1;~:- >:r :,".:... . .. . ~ ~"" .- .;:..:;. . -;/ iJ ~11 , ;"'!', <,,)t.(-<J~ ' - ..ti.~"I"""~.. ~MJ 6~~:J~"-7;~;~ ) '~'~~:fOI i',t1'~'t) .~:'f .,-'~ ,1i1~~f~~:'I~~;~~.~!_ii1ljJ (/) ~.....~ (I:) ~ ~ t-! c' ...;; H ti) ~ (.) 1-' ,-~ ~ if.! t:r; LC) u'") (>') {Y) ...:l ~ (1) U) Co ;:G r_) N t: ~ ---' '-' ~ "~ .., ~ ,,, E ~ .0 ~~ :::: -..... ~.I,-- b (l) +-' -' .v ..... rjJ Cl) ...c: +...J ;..... t'.... .~ :) (j ~ "'-, ~ () r ' U ~'..a () 3: o ,-j \'::"1 (",) .. ..,~ o ,..'1 ,r, ..--, p ~) C {J.,) o Cj) '....- Co..) ~~ b~ i::: .~.,~ i.$:ro O,:r: ~ (]) .Q o ~J V .::...... cG ~d (j) 'l::. ,..... o () .- ....... - '0';; 4->." (\)rr:l ,... . -:;.:Jz p8 :-'E-t -,-. J2..::t i--.ffiO Q) . ,..., . ~ ;>-; ..c Q) ..... tU ..c:: ::/J Ca '. t:l., ~. ,.... o (\) ...... ::\~ ;S::: ~ t-' Q5 CJ ~.( ~ (/} r-' 7:: -::l ~ -::J c;r. o o "'.J t:':: a.1 .s.:: '" ;:;.~ ~ s:il cr r..i ro ~ t..~ o ;:! ~.5 o :i~ ',. -:::; :.: -' +.' rr, ~ :5 i f I II r J I \.1 ~ ~I , --.JI \ i . i ~\I vi ~ ....- .- ~...J c: ~ ::1 ~ ~...~ C2 -. -' V! <"" :;j ;:c. I ~ '-'- t f~ ~ ~. ':..rj '.~".""1.. .:... ......,... '. .' ;--::,...:.:., .~ '. . - '.. ". .. '. ..... : :~. .... ~ ., . ". . .'. ~ '.' .... .... '... .', .....:;..:..::.:..:::..: ...... .:; ~ :~';:.'':'''.'' : : .. ............ ..... "':'.:"':':::.':-':':" :':. -::.. . '.,. :" .'::1. -: .. .........':",..:;... ..: : ...::..: ~:. ,.;. ": ". . . .... ..:.:. . . :z 0 r:: ..... :::i 0 -. " 11)?- C)W . r::1 Cl 0 ro,...J 1-<< ~ Q 00 .......;2 ;> "OW ,...:l 11)0:: l!l ...--. 0:: ,...:l 0\ :'.:: 0 UJ tr) ~f- P.. If) 11)~ ~ <C ~ ~ ::r: ~ "O~ U ,...:l J::W r.r.. rof- ..A:t :>- N <( ~ "dm .~ r- 0<( ::J :-'t/.l :.~ ~ (1)0 .......f- ".1'"1..._ .riUJ COm 11)00 .....< >-. ....... ::l "0 tZl ....... .. . ..:.:,' '~.:.~.~ .~;".?.~.: .- . .: . ". : ~ ... . ...... .. .... :...;.\...:.:.' ;~'.:.':-'::. . ....: ~ :. c :. :. !,":' ;;:;..:: :.~:' ~.-;':; )). '.';;-.{..:..."..,t.'.: ~.-.'.jf,'...:.'.'.:.;.. . .: .:'.;~ :~ '. .'.<. ::.:.,' - - . . .. . .~\...:.;.:.~:::... ',.'. .... :". :>;'7.:.:. . .".....?~~f~~~if~ . : . :=:~:{?;~\ySy(: (~ c; C~ State of Mississippi i~" -:. -.'...:" .'.-', -..", '- ': pepaf;t1!!ent :ofEIJljironmental Quality <::"- :::.:: :,~., <;;:.. ';':,-;>,'::,;::.~'- \'..~,',< . ..,' - . ,.; ';;"f!ffice'ol !ollution Control ..'" ',''-.~, . ,,; _.-. :'..;. ," i ..,(>.><.'~ . <~).i.'Y .<' ~ .';j'Ce~tihcate,ofLic:ehS ure ~> .~fi:~.' ,.J~1~,:;~:~;:':';;:r<:~. .'., . ..., ...:>:..... ,..: ',. , . _. ..\. In accordance wIth the Asbestos Abatement AccredItatIOn and CertIficatIOn Act, ..~~ .>t~t-;;c."", }::::':}',>~~;'?,]-~~'J>' .:';~>_:;:-~""P.'_ :-..' : "'. '..:.'-....',.._ .~. '.: '<. ! . " ,,~Ena91~d:~s.'i98'9..Mississippi Law; chapter 505 '-\".: ":':>"'/':' .' . . .; . ':".- :' : 't, Be ttknown that "'>:~;~:.:'.~', '-~': ;f: . . -'.' . '.... ,:,:-,,<}..:::. '..:..'lluss~{IEArney .....',-,. .f" ft~Yirig;s~lJrvitteq~c~ePtable evidenc~ .of quali~catio1.1s'~md training~d "9!ller appr6priat~ inforrilation, is hefeby .gnmted this . /:~J{ ,'_. \. '~;sbestoi:'Contrilcto; ... . :.:::.' ,"'." ,~..' .' .:.'.: '. ", Certifica tion Certificate No.: ABC-00002111 Expiration Date: Sep 10th, 2011 Training Expires on Sep 10th, 2011 ( . Chief, Certification Brandt 52047 LIC20100001 c c c BOARD: P~ul,C. AughU}', ill Cn:;urman 'D H E BOARD: Hcnry C. Seocr M, David MircJdl, MD Edwin H, Cooper, III Via: Chairman Srcvro G. Kisner Sec"'tary Glcnn A. :-'-kGlI C. wi Humer, Commissioner p,'o71loting ,1lla proucting thl! /Ji'!lub of thl! pubiic and dJ,' i?m'inmment Coleman F. Buekhouse, MD Soutn CaroEina ([)epartment of 1feaftfi awf 'Environmenta{ Contro[ .Jls6estos .JlGatement License 'lliis Certifies 71iat Cross Construction Services fias met tHe requirements of Soutfi Caroti.na <R..ffgufation :JVo. 61-86.1 for Ei.censinf] in the category of Contractor rrFie [io[([er of this Hanse sfiarr compr)' witli aa"appHca6fe requirements of said regu{ation. rrFiis (icense is not transfera6fe ana sfiarr expire. one )'ear from the crate shown 6dow, .rJ~ /(; .' ".. . 'KJitn 'frost, 'Director jfirCompfianC{ MaMo'men/. !/)jllision rBunau 0/ jfir'Qdl1fily Saudi Carolina tV'paml/me ofH.aCtlj oi 'E!l1Iirrmm,rU4( IDflPE: January 13,2010 LlCENSfE :NO: CO-0030J This license is the property of the Dcpartmcul alld must bc surrcndercd Oil demand, Contractors must post a copy of 111ls license In a conspicuous placc al each worlcsite. DHEC SOUTH CAROLINA DEPARTMENT Of HEALTH AND ENVIRO~MENTAL CONTROL_ 2600BullStreec' Columbi<l,SC29201' Phonc:(803) 898-3432 . www.scdhec.gov .... .'.... ..~..'.~,...... ..:".~-;. .... . :.:- :.(.-,~ ;::":' ::. :--:<': ~~~'.~ ,;':, ::.:: ~ ':', ',-,,'r ........ ~,.~, :~.~.;'~ .'...:-:<:",':.: .' , ,.'~_' "'.~__..:--:_'" ',_ ,._ .n,'.~,,~, , - . .... . ~ ._-:':h_!~~~'\-_.l .) ~<lrm;;;nw~~.!Ji.'i;'1'J,"'~';:IllSu-"'l'L"'ez.Er'~:!i1~~"'EP',:E.':'"i'!:t;m;:::lif7I(,~"'."l"'J:~~~1;]T~..~.En:;.r.:~;;r~~""""""'~;=~"'fl:kW!!.\';tJff"';:~;,),~t<l.~~ :~.1 l'! C" " ~ , ri a,< ;;, ;;; ~: ~~ R~ tJ i:ll d ;~;, H ','. :; l'" I!; ;:j ~:~ r: Ii ;~ ...: b ~ ,( 1;-4 ~ fJ ;1 H i CI~.i '. n ~] " I~i ~.~ .~~ ~:, (:: I~J n f~ ;:. j~ ~:~ " " 1"~ Ii i~ ~~ ,.' ~4 ,- ;{ .; , ;'I 'i , I! ., I: .. .;; .. ~ .. t~ J ti ~ ~" .... 0 I- , 0 ~ .... ~ u Q) ,! I- ~ , 4- o o :t o It.. o ~ ~ lI) ~ -..J US ::t: l1... o l- ~ ~ ~ ~ lL.J Q -l-J C ill E 1: ro 0.. ill o ill .c .j..J 4- o ~ ii c Environmental and Public Protection Cabinet DEPARTMENT FOR ENVIRONMENTAL PROTECTION DIVISION FOR AIR QUALITY This Asbestos Abatement Certificate is Awarded to CROSS CONSTRUCTION SERVICES, INC. in recognition that their personnel listed below have demonstrated proficiency and have fulfilled the training required in 401 KAR 58:040. NAME SOC. SEC. NO. Stephen M, Burroughs"'u_",*-",,,"u James Ritz u* ** u** c NAME SOC. SEC. NO. NAME SOC. SEe. NO. Benjamin Livingston***-**-**** Jimmy Livingston *......_*'1<_>1<*** This certificate is issucd subject to the following conditions: 1. This entity shall comply with 401 KAR 58:025 and 401 KAR 58:040. 2, A person listed hereon must be on site during asbestos abatement activities, CL ~()Q{,- ~A~ Parker H. Moore Field Support Section Supervisor John S. Lyons Director CERTIFICATE NO. C10-448-1 EFFECTIVE October 16, 2010 EXPIRES October 15. 2011 - ...:1 ~-._-~-- ~ -~ c c c c c '(/) ~ u ;-..( ~ ~ r:/J. ~ ~ ~ ~ ~ f-l <C f-l en. ~ o ~ z ~ ~ -< A-, ~ Q [/) ~ ~ f-1 u ~ rfJ. ~ U > ~ ~ \:i CFJ ti Z ~ o~ I-( 'U [-l ~ ~ i ~~ ~ ~ 00 .~ z o u 00 rJJ o ~. u ..., o ~ .~ ~ . ~~ ~-... ~ t3 .~ ~ ............. .~~ ~ a ....."lj ti e ~~ ..8 tf 2 ~ ~&.:i V) ~ O\':S ....... :...-S S ~~ ... ~~ ~ ~ g. :.... ~~ .w ~ d ~ ""C - o 0 ~ U u~ -I-> ~:... ~ 10:;: ~ ~ .~ ':S ~ ~~ ~ ~ b<> c;t ~-~ ,..Q a ~ -< :... ...-:; d 8 S ~ g ~ "1.::3 2 ~~ ~ ~ ~ -< .~ ~ C :... ;::! .~ l:l.,~ III ~ ':S ~ -:::r 13 ~~ .~ a ~ ~. ~ :... (j :... ~~ ~~ a ~ ~ ~ ci E} &:i ~ ~ t.o:l ~ ..... ~ ...... ~ ~ .~ ~~ ~ :><"' ~ , ~o . ]' > j~ ..' 0 I' ~ UJ ~".' d~ '. 0 . u i..; Q) ,.D ~ Z Q) en l=l t1.> o ;J ;0 r;j o t:1 o -.g I-< .~ ~ I .. :-. Q) ..0 8 ~ ......... 8 To-' r:: o U .--.. Q) +-> cd o Q o ...... +-> cd ..... .~ ~ !-< Q) q:: -< '"0 ...... o :> '--' W ...J ~ W u.. (f) z ~ f-;- z o z a ~ W, I- ...J <( ~ o o > c , ~~~~.:E~~~~~~~W--~~~~Z~~~~~~~~~~~~'*'~t~};:t.-r.~~~~~Y.f~t~~~~~~-0?J5.t.~~ :...:.:;. '::::. '.~. ~.:" ~ :::':;-" :,::;:::O::'~':';;::" .;:-~:...~~ :.;';-~::::.;;: ':.::-:.':'"~~'.>;'.".:~':- -:.;:-~~.:. :t: =~::;. ~:::';.:::'::::~:;_"''-;.z'''';~'~:'''''.!.''' ~-"; ~"~' :"'~';~'';'~''\ ,~.~.~~:: ~:.:.:.~ ,~:; ~':"'''8;:'':'\.1'~::..:-::~ :.~.~";.'i.~*_\:,:"';V~~~;;::'" ':.::;f'~...-;'.1 :..;-::::,':.~':-:.::~.;:: -J ::.:;~~ ~:: ;; -.; :;'i'~~I- . c i~ It ,I ~~ H' ~ ,,- If ~~ iJ~ ~~ If ~;~ w ~~ ~~ tn ~" " z 0 \i- Iii -l-' w "0 0 Q) OJ ~i U l;::: > -l-' C If 1-1 :p Q) ~; ..J 10 co E :J Q) l:H ~ 0- 1- 1: I" en co {l. -~ 0 C Ti 0- r c Q) , .... '> 0 r :J u 10 0 ..c U a) '" ~ ~ ..c B" -l-' ~.. -0 ..c __l-. EP a) == l.l- B~ 0 ~I --J I- UJ ro L5 z C ill ru U} ill :r: IJ 0 u Q) :J 0 - u UJ ..0 ~ ::r: u >- ..0 ill E ,~ ..0 ..c :J 0 !..l- I- Q) :J -l-' ~~. a.. 0 0 Z 1- "0 U 8.~ Ll... OJ ill <1J lY ..c ..c X ~ 'f 0 ~ +-' :E 0 r'i. ~ (fJ l~t. m >- ro >- ~ U ..0 -l-' I~ w "0 U l- e -0 E~:: ~ .... OJ C Q) H~ ~ <( ro ..c ' < .J-I ~~ ... 0- Q) -l-' t.Q II) ct: Cl.J 0 E c ~;j U) <C u "0 ... ~\ ~ ro ro I~ '> C 0 Q &.. (fJ .-4 ll.! a: (IJ (!) >- 0 iF Q Ul :J E N ~tv -0: l- e "0 ... f.i N ,2 ..c <1J M .lJ ..0 0 ~" -<< ti 3 'C ~ I~ J: :s <1J u .' u UJ m f &.. .0 .i Ul .a.I C ::J ~ .J; 0 II) co III &.. i~ e "0 ..c t- o L.. (!} (IJ ~~ u 0 > u.. i' (I) u co .' W U1 u ..c c ~. ({] .J CO II) vi >-< 0 [ 0 C I- 4-~ ,2 tI) L- a ~:., ,; U ~ 0 ..c r <C +-' U Q) 0 Tr .w ({] ~ L.. Itl (!} 'l- ,) .r:: >- .j..J ..c 0 ,l .w n c ~ c 0 <1J U U -l-' ti': ~ rn ro (!} VI -l-J ~r 0 1- U) (!} (f) C :J 0 C ..Y +-' a- U) :t:! ..c f. ~ (1) OJ $ ~ .' ,..::-: 1- ..0 co I' <IJ UJ UJ C OJ IF ra <U <( t-f :c r =~ c Q ~ :-..... .-t .-t 0 N P'I" en 0 t.I:) ~ cn .-t I'fI U ::J < ~ .c CIJ u. l0- a CIJ r... L- CIJ Ql .c .0 :p +' E: c In ;:l ::J 1II C (IJ QJ c: ill :> .'!! VI U c ~ ill 1lJ U tt:: c: :::i ill M .c ~ III 1lI :I: .... o 1. o oJ.J u OJ 1. a ~ ..~ ~ II n H #1 H H " I '.~.; i t:; I ~t: ~l i .JI H ~, ~i . ~.;IH fj. " h si II Ii I ~I Ii i U " f' ':.; . " ~i ~i <j U U rJ f~ d ,.... n. N t\f o l~~ ::r r: t > H ~H '" ~ !'I W d J: n fi ~..c;:;:_, ,_',. ~j~~~~~;;~~~~~~~~;~~~::;~;~:~~~:':=~:~~~:~;~~::'~:::>=~~~ c ~ . 0 u .~ ~ z ~ .~ z .... C) 00 0 ~ ~ z () 0 rfJ. U l:.t-4 rfJ. """"'" ~ OJ) < =~ 0 ~ s::: r-- .....c "t:S <(i=< s::: ~ ~ C'\S z-~f CIl ....- ~ 0 rfl Z ~ .~ ...J l) "t:S 0 ~ 0 0 M .~ 000 0 I ,.-..1 ~ c..? 0 0 """"""" . ~ s::: ~ S C ~=m ~ U) U ..... 0 M ~ ~ (l) .WU')~ ~ ..c Q ~ E 0 ~ 00 ~ ,.-..1 ~c~~~~ Z ca ~ 0 ~ en U ..... 0 00 .~ ~ 00. 0 Z ~ u c c c ...... ~ ..q u '2 ~ o ,.-< -l-' ro N .~ b1) l-, o ~ c RUSSELL E. ARNEY President Background and Experience: Mr. Arney started with Cross Construction Co. in 1981 while still attending high school and college. He trained as an apprentice to asbestos workers performing various tasks associated with the abatement industry. He attended Retra Services, Inc. (an accredited facility representing University of Florida/Treeo Center) and completed the AHERA certification as and asbestos worker. After further experience working on crews, Mr. Arney was promoted to Project Supervisor in 1988, coordinating work crews of 10 to 50 men. In 1991 he was promoted to Project Estimator, responsible for the preparation of bid proposals. Becoming Vice President in 1992, Mr. Arney was responsible for estimating and preparation of bids, pre-bid attendance, specification review and take-off, coordination of project schedules, cost control and scheduling of supervisory personnel for projects. In 1996 Cross Construction Company incorporated Cross Construction Services, Inc. to exclusively handle the environmental division. In 1999 Rusty became President ofCCS. In 2004 CCC and CCS again merged to offer turn-key services to our clients for all their environmental requirements as well as demolition services. In 2008 Rusty became Owner of CCS and CCC and continues as President of our firms. c Years of Experience: 27 Professional Registrations/Licensing: State ofFL - Certified Building Contractor - Certificate #CB C059838 State of FL - Asbestos Contractors License - Certificate # CJ C056725 State of Alabama - Certified General Contractor - License # 44358 State of Alabama - Asbestos Contractors License - Certificate # 9193339 State of Georgia - Asbestos Contractors License - License # 70NFll1730 State of Georgia - Lead-Based Paint Certified Firm - License # 1007082310 Education: Hillsborough Community College - Building Construction United Electronics Institute - Emphasis on Electronic Technology, Analog & Digital c Accreditation/Certification: The Environmental Institute - EP A Model Course: "Asbestos Removal in School Buildings" National Health & Safety Training Consultants, Inc. - Certificate of training "Health & Safety Management; Site Supervision Instruction - OSHA Compliance" Delta Paining Corporation - Asbestos Removal Program "Asbestos Removal in School Buildings" University of Florida - Treeo Center - "Certified Asbestos Supervisor" META, INe. - AHERA Asbestos Inspector Initial Course, AHERA Asbestos Management Planner Initial Course & 3-Day Respiratory Protection for Asbestos Abatement Course c (fCS) ~ Co.vSll<<;cnON Sv.V:<''EP ANTHONY HANSON Vice President Experience Background: 1990 - Present Tony joined Cross Construction as an asbestos abatement technician and assisted on projects where he excelled in his understanding of the environmental industry and its potential for innovative abatement/remediation procedures. In the latter part of 1990, Tony was promoted to Project Supervisor for his ability to take the initiative and "get the job done". He was assigned many of our specialty abatement projects; i.e., telephone switch stations, hospitals, schoqls, libraries and court- houses. In 1998 he was promoted to Project Manager and in 1999 Tony successfully passed the State of Florida Certified General Contractors test. In 2000 he was promoted to Vice President. A portion of his duties include: c . Selection of work crews, equipment and material to perform projects. . Scheduling of CCS projects. . Directs field supervisor as to size of crew, equipment and material. . Estimating and cost control. . Interaction with owners, consultants, regulatory officials to insure timely completion of projects. . Attend pre-bid meetings and final "walk-thru" inspections with clients, owners and consultants. . Negotiate contracts. Professional Registrations/Licensing: State of Florida - Certified General Contractor - License #CG 062095 Maior Asbestos & Demolition Specialty Proiects - Project Manager Tampa International Airport-Airside B & C - $2.5M Clearwater Mall Demolition Project - $1.2M Central Park Village - Tampa Housing Authority - $750,000 Sprint-FL/Fort Myers, FL - Telephone Switch Station! Asbestos - $1.3 Million Morton Plant Mease Healthcare - Dunedin, FL - $275,000 MacDill Air Force Base - Hospital, Tampa, FL - $310,500 Martin Memorial Hospital, Stuart, FL - $167,100 McKay Auditorium, University of Tampa - $401,918 c Ed uca tio n/ Accredita tion: United States Marine Corps/1982 - 1986 Tampa Bay Vocational- 1988 - Air Conditioning & Refrigeration Retra Services, Inc. - AHERA certification (required annually) American Heart Association - CPR certification Indoor Air Quality Services -Mechanical Hygiene Contract Services Course by Global Environmental Technologies/1996 IAQ Remediation TechnologieslThe Environmental Institute - August 1997 c ~ CONSTl<<Jen"" S~ ETHAN "TYLER" LILLIBRIDGE Vice President Back2round and Experience: June 1991-Present Tyler joined Cross Construction in June of 1991 with the desire to lean the demolition industry. With a willingness to learn he started at the entry level laborer position on demolition sites and progressed to heavy machinery operator and then foreman. In 2006 he was promoted to Vice President of demolition for the company and is responsible for all phases of work from the big process all the way to final completion. He has also been involved in the remediation side of the company and has a working knowledge of OSHA, EP A and state regulations. His responsibilities include: · Manage federal and state funded term contracts. · Cost ControL · Interaction with Owners, consultants, regulatory officials to insure timely completion of projects. · Adherence to all federal, state and local regulations while performing work at projects. · Chief Estimator for Demolition c Demolition Proiects: Here are some past and present relevant contracts that demonstrate our diversity. FDOT Term Contracts Hillsborough Community College S1. Cloud City Center Gulfport Elementary School Bay Pines Trailer Park Demo MacDm Air Force Base South Florida Water Management District Criss Angel Mindfreak- Spyglass Implosion NOTE: Projects accomplished simultaneously. $1,600,000.00 $ 685,000.00 $ 94,635.00 $ 165,700.00 $1,456,000.00 $ 500,000.00 $1,586,000.00 $ 268,000.00 Accreditations: · AHERA Trained Asbestos Supervisor · American Heart Association-CPR Certification · Member of the National Demolition Association . Class A CDL · Forklift Certification · EP A Lead Supervisor c Licenses: Certified General Contractor (Florida) #CGC1505176 (2002) c ~C8d CONSnn;CTIOS sO" SKIP JOHNSON Sales, Marketing, Estimating & Project Management Background: Skip managed the asbestos program for the State of Florida during the late 1980's and 1990's overseeing each phase of asbestos remediation for all State owned buildings. He then taught construction safety for two years for the same State department. Since then he has worked on the consulting and contracting side of the environmental remediation industry. He has been involved in projects ranging from small commercial to large multi-million dollar industrial projects as a regulator, consultant and contractor. His partial duties include: · Sales and marketing. · Selection of project supervisors, scheduling, bid estimates, GMC's and acquisition of sub-contractors. · Interaction with Owners, consultants, and regulatory officials to insure timely completion of projects. c Years of Experience: 21 Professional Registrations/Licensing: State of Florida ~ Certified Asbestos Contractor - License #CJ C054114 Certified Mold Remediator Accred itation/Certification: U.S. Department of labor (OSHA) Certificates - 1. Industrial Hygiene for Consultants 2. Construction Safety Standards 3. Electrical Safety Standard of Construction 4. Fall Protection for Construction (1 week) University of North Carolina: 1. Respiratory Protection (2 weeks) 2. Confined Spaces 3. Demolition (3 days) I 4. Train the Trainer for Environmental Occupations ~ _ University of Florida - Treeo Center - "Certified Asbestos Supervisor" Georgia Tech - AHERA Asbestos Inspector, AHERA Management Planner, 3 Day Respirator Protection 'c Cross Construction Services, Inc. c 25221 Wesley Chapel Blvd, Lutz, Florida 33559 Phone: (813) 907-1013' Fax: (813) 907-0297 JUAN OROZCO Project Supervisor Experience Back~round: February 1995-Present Juan joined Cross Construction In 1995 already having experience In the construction industry. He has been a demolition supervisor on many of our projects for the last five years. Juan performs with initintive and thoroughness, c His responsibilities include: 1. Selection of work crews, equipment and material to perform projects. 2. Direct field supervision of crew, equipment and material. 3. Cost Control. 4. Interaction with Owners, consultants, regulatory officials to insure timely completion of projects. 5, Adherence to all federal, state and local regulations while performing work at projects. Demolition Projects: Minute Maid City of Palmetto Navy Base #646 Charleston, SC NAS Jacksonville, FL Boathouse Publix, Leesburg, FL Beaumont Administration Building FOOT CVS/Pharmacy's USF Solarium $ GH:b50.00 $ 16,500.00 $ 126,460.00 $ 111,000.00 $ 59,000.00 $ 33,072.00 $1,600,000.00 $ 23,DOO.00 $ 21.130,00 Accreditation's: Retra Services, Inc,- Initial Worker Course Initial Supervisor Course American Heart Association-CPR Certification c ~ r:.r.:l ~ ~ Z O::r:: E3 co~ ~z :J~ 00 ~r:.r.:l C2[::: o::r:: o~ ~OZ ~u zZo ~~ r:.r.:l~_~ ::r::a ~~~ro ~r:.r.:l ~~<I::-:S ~r:.r.:l ~r:.r.:l~CI) o~ ~~~<1.> C/)~~o...~~5 ~~ r:.r.:lc/)z~ 0[::: a~_~ ~C/) C/)<I::~u ~z r:.r.:lZa -- ~o~ C/)c; <I::- ~z ~~ r:.r.:l_ C/)<I:: ~~ ~~ ~~ ~2j b zo <I:: :::> ::r:: C/) o ,..q C) rfl Cj) I I o ~ ~ C) .~ ~ ~ ~ u 'i:J > ~ Q) 3 .... Q) U ' U bO ~ ~ ro 0 ~ ;::: ~ '.cJ " ,.Q '" ro , CIl r<'4 g IUv Z f=:1'O ~ . @ ~ --...d ~ 5'0..... " ..... 0 ~ ~ l-< ~o ~p..~ ,.Q iZl ~ ;:J ~ t'J ::: ~ ~ ::: .~ en 't<::::>~ .8 ~ ~ ~ ~ b1) t; ~ '""' (l)s R d:::f"l'-' 00 . ;:::::l ~ '-; lr) 0... M .8 u ~ ~ ..s ~ ~~O'"d(l)OI +->"::::+->(1);>0 ..... '"d(l).......... '"d~a!;::lQC\J Q)~'-;w >- ~~a>..........o Q) ~ ", ;> C\J l-< ....... t'J ~ C\J ~ 0... Pi "ti 9\ en 0 0... d ~ '" .r-< .r-< ....... H ~ O(j '"d en "-< O~~d~'--" o:::Oi:d~~ ~ ~L.~ l-< l-< ~ .;::: V:) k; E p... '0 Q)..:::: ~ 5 bl) p... S ~ ~ u .8 ::E ,..q~~~@U -t:: IoN ~ 0 . r-< ':> ~ U '.;::J 1:1 .0 ;.> ~ C\J 0 (I) '"d~~gu~ 8 :::... "c;:; '"d 4-1 CI) w ...... ~ J:il o-.q- ~~~""""(I)rrl .......~ L..o. ~""'~L'~-.q- q V:) .r-< 0 4-i .. ~~]~O~ . ..... ::: +-> CI) (I) rQ ~ .,g g ~ .s <C '"d ~ '"d (I) >-. ~ ~@-B..o rot \J U >-. ~ \J ...0 a t ~ """'; Ir) ~ a Q) B '.cJ CI) E bJ) ~ 's t; '8 . t) ~ J ~ ~ 4-; CIl '.... 0 ~ Q Q) r::: () ro lE o 0 ~ CI) o. r; Q) 'i:J ';:l ~ Q) <;J.o s Q) '.... 0. O~]..9 ..d~"'Q) ~iZl~> ~ "4-; Q) "C>-'OQ :: ..... Q) ....... CI:l~bJ)ro -Q)Q)~ ~ :-8;:::: 8 ..d CI) 0 'CI) ..... ~ U ~ :lp..~4-'< CI) Q) ro 0 ... () Q) ~ ~ e>Q~ o Q) E ~ ,.Q ..... ro ,,.., ^' ro '''''; ;:l .... '''''; () ~ o () 0 '.cJ ~ CI) ~ Ul Ul 0 <r:<r:u ::t ~ ~ <C ~ ~ ~6"-"7__~__~ ::t , 1'''*, .. ~',,> !""!;.':ii!"T':::~f.;'fJZ~~'(!;Xtr,f/#,jj;,.!;;jf!Z;'lff.ii . '7, ""'''''''h. ". ,...,,.,,.,,. ...,v."., i ;"~~~~i!7;;,:\ifi;~*;{::\~fti:?2Yi~j~j?::<<ft1~~:;(;~1~~i;l;;;\:;(~*P;\',,~'1Ji;,':;'~:"';ilif, ',', ..,'~~, "..., ., c 25221 Wesley Chapel Blvd, Lutz, Florida 33559 Phone: (813) 907-1013' Fax: (813) 907-0297 TECHNICAL PLAN FOR GENERAL DEMOLITION OUR TECHNICAL PLAN IS PREDICATED ON PROVIDING DEMOLmON SERVICES TO OUR CLIENTS IN THE SAFEST AND MOST COST EFFECTIVE METHOD POSSIBLE. THE MOST IMPORT ANT GOAL OF OUR PLAN IS TO MINIMIZE THE RISK OF INJURY AND PROPERTY DAMAGE WHILE EXECUTING THE WORK IN AN EFFICIENT MANNER THE BEST WAY TO ACHIEVE THESE GOALS IS TO APPROACH EACH PROJECT WITH A POSITIVE A TIITUDE AND TO IMPLEMENT A TEAM APPROACH TO COMPLETING THE WORK. THE SUCCESSFUL TEAM CONSISTS OF THE FOLLOWING ELEMENTS: (1) PRINCIPLE IN CHARGE (2) OFFICE MANAGER AND STAFF (3) PROJECT MANAGER (4) PROJECT SUPERINTENDENT (5) EXPERIENCED AND WELL TRAINED WORKFORCE THE PRIMARY RESPONSffiILITIES OF THE PRINCIPLE IN CHARGE ARE: c (A) PROVIDE RESPONSIBLE AND EXPERIENCED EMPLOYEES (B) MAKE SURE TIIA T ALL TEAM MEMBERS HAVE EVERYTIIING THEY NEED TO ACHIEVE THE GOALS OF THE COMPANY (C) ASSIGN RESPONSIBILITY AT ALL LEVELS (D) PROVIDE TOP QUALITY EQUIPMENT AS NECESSARY TO SUCCESSFULLY COMPLETE ALL OF THE WORK (E) MAKE SURE TIIA T ALL FACETS OF THE PARTICULAR JOB ARE CLEARLY UNDERSTOOD BY ALL RESPONSIBLE PERSONS (F) OVERSEE ALL ACTIVITIES ON A CONTINUAL BASIS TO MAKE SURE THAT ALL WORK IS PROCEEDING SAFELY AND CORRECTLY AND TIIAT ALL GOALS OF THE COMPANY ARE BEING ACHIEVED THE RESPONSffiILITIES OF THE PROJECT MANAGER INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: c (A) PROJECT MANAGER SHOULD DECIDE WHAT MUNICIPALITY HAS JURISDICTION OVER EACH INDIVIDUAL JOB AND MEET WITH THIS INDIVIDUAL AT THE EARLIEST DATE TO MAKE SURE THAT THE PERMITTING PROCESS WILL GO SMOOTHLY (B) IDENTIFY ALL OF THE UTILITY PROVIDERS ON THE FACILITY AND MAKE SURE THEY HAVE ADEQUATE TIME TO DISCONNECf SERVICE FROM THE STRUCTURE BEING DEMOLISHED. SINCE THE TIME REQUIRED TO COMPLETE THIS PROCESS CAN BE DIFFICULT TO QUANTIFY, IT IS EXTREMELY IMPORTANT THAT THE DISCONNECTION PROCESS BEGINS AS SOON AS THE CONTRACTOR RECEIVES A NOTICE TO PROCEED (C) REVIEW THE ENVIRONMENTAL SITE ASSESSMENTS FOR THE STRUCTURE AND MAKE SURE THAT ALL HAZARDOUS MATERIALS ARE COMPLETELY REMOVED PRIOR TO DEMOLITION COMMENCING (D) SEND A TEN DAY NESHAPS TO THE RESPONSIBLE AGENCY BY CERTIFIED MAIL WITH A COPY BEING SENT TO THE OWNER c (E) REVIEW THE CONlRACT DOCUMENTS AND MAKE SURE THAT ALL APPROVALS ARE IN PLACE AND THAT WE HAVE DUE AUTIIORIZATION TO PROCEED WITH THE WORK (F) PERFORM A PRE-DEMO INSPECTION OF EACH WORK SITE TO MAKE SURE THE ACTUAL WORK COINCIDES WITH THE CONTRACT DOCUMENTS, FILL OUT THE ST ANDARD COMPANY JOB CHECK LIST AND MAKE SURE IT IS PLACED IN THE PERMANENT JOB FILE (G) DURING THE SITE VISIT LOOK FOR ANY PossmLE DANGEROUS SITUATIONS THAT MAY BE ASSOCIATED WITH TIllS WORK. AND RELAY THESE CONCERNS TO THE PROJECT SUPERINTENDENT AND OTHER TEAM MEMBERS (SUCH AS LOW HANGING WIRES, GAS LINES, SEPTIC TANKS, TREE LIMBS, ETC,) (H) OBSERVE HOW THE SITE IS SITUATED IN RELATION TO THE EXISTING ROADS AND DEVISE A PLAN AS TO THE BEST HAUL ROlITE FOR ALL OF THE WASTE GENERATED BY THE PROJECT AND BE ON THE LOOKOUT FOR SIDEWALKS, CURBS OR OTHER ITEMS WHICH MAY NOT BE PART OF THE DEMOLITION BUT HAVE TO BE CROSSED TO GET TO THE JOB SITE. IF THESE ITEMS ARE TO REMAIN AND NEED TO BE PROTECTED; A PLAN TO ACHIEVE TIllS PROTECTION NEEDS TO BE DEVISED AND IMPLEMENIED AND THE SUPERINTENDENT NEEDS TO BE MADE AWARE OF THE PLAN (I) MAKE SURE THAT ALL CONCERNED PARTIES TO THE UPCOMING WORK ARE CLEARLY IDENTIFIED AND ARE THROUGHL Y A WARE OF THE EXTENT AND OUTCOME OF ALL UPCOMING DEMOLITION (1) MONITOR THE PROGRESS OF THE WORK ON A DAILY BASIS; ONCE IT IS UNDERWAY TO MAKE SURE THAT IT IS PROGRESSING ON SCHEDULE AND NO UNPLANNED RISKS ARE BEING TAKEN (K) MAKE SURE THAT A PLAN IS IN PLACE TO ASSURE THAT THE WORK SITE CAN BE ADEQUATELY SECURED AND "SAFED OFF' TO PREVENT UNAUTHORIZED PERSONS FROM ACCIDENTIALL Y ENIERING THE WORK AREA DURING OR AFrER WORK HOURS (L) MAKE SURE THAT AN EROSION CONTROL PLAN IS FORMULATED AND PUT IN PLACE TO ADEQUATELY CONfROL ANY EROSION AND RUNOFF THAT MAY BE CAUSED BY THE DEMOLITION ACTIVITY (M) MAKE SURE THERE IS AN ADEQUATE SOURCE OF WATER FOR "WET DEMOLITION" (N) TRACK THE PROGRESS OF THE WORK ON A DAY TO DAY BASIS WITH AN EMPHASIS ON ELIMINATING PROBLEMS BEFORE THEY OCCUR (0) ONCE THE JOB IS COMPLETE, CONVEY THE BILLING INFORMATION TO THE OFFICE STAFF FOR BILLING (P) DO A FINAL INSPECfION OF THE SITE TO INSURE THAT ALL CONlRACT REQUIREMENTS HAVE BEEN MET AND THE JOB IS TOT ALL Y COMPLETE. TRY TO HAVE AN OWNERS REPRESENTATIVE TO INSPECf THE SITE AND VERIFY IT HAS BEEN COMPLETED (Q) REVIEW ALL BILLS OF LADING AND LANDFILL DOCUMENTS TO INSURE THAT ALL WASTE WERE PROPERLY DISPOSED (R) CALL FOR FINAL INSPECTIONS WITH RESPONsmLE GOVERNMENT AGENCIES c RESPONSIBLITIES OF THE JOB SUPERINTENDENT: ~ (A) REVIEW THE CONlRACT WITH THE PROJECf MANAGER TO CLARIFY THE SCOPE AND INTENT OF THE UPCOMING WORK (B) REVIEW THE JOB CHECKLIST WITH THE PROJECT MANAGER TO MAKE SURE THAT ALL ITEMS OF IMPORTANCE ARE BEING ADDRESSED (C) INSTALL ALL EROSION CONTROL AND TREE BARRICADES (D) REMOVE ANY FLUORESCENT BULBS, THERMOSTATS AND OTHERS MERCURY CONTAINING DEVICES (E) LOOK FOR ANY POTENTIAL JOBSITE HAZARDS NOT POINTED OUT BY THE PROJECT MANAGER (F) GO OVER THE SCOPE OF THE WORK WITH THE DEMOLITION EMPLOYEES (G) CONDUCT A PRE-WORK. JOBSITE MEETING WITH ALL EMPLOYEES AND GENERAL SAFETY AND SPECIFIC JOBSITE HAZARDS c (H) UNLOAD ALL EQUIPMENT AND INSPECT TO MAKE SURE THAT IT IS IN GOOD WORKING ORDER AND THAT WE HAVE EVERYTHING WE NEED TO EXECUTE THE WORK. (1) DEMOLITION WILL COMMENCE IN A DELffiERATE AND CONTROLLED MANNER WORK WILL PROCEED FROM TOP TO BOTTOM BY PROCESSING THE BUILDING INTO SMALL PIECES THAT CAN BE SAFELY LOWERED TO THE GROUND OR PLACED IMMEDIATELY IN TRUCKS FOR TRANSPORA TION TO THE LANDFILL OR RECYCLER (1) MAKE SURE THAT MATERIAL IS THROUGHLY WET TO INSURE THAT NO FUGITIVE DUST IS BEING GENERATED BY DEMOLmON ACTIVITIES (K) VERIFY THAT ALL mUCKS ARE LOADED PROPERLY AND TIGHTLY T ARPED PRIOR TO LEA VING THE JOB SITE (L) MAKE SURE THAT NO UNAUTHORIZED PEOPLE ARE ALLOWED TO ENTER THE JOBSITE WlllLE DEMO ACTIVITIES ARE UNDERWAY (M) VERIFY THAT ALL EMPLOYEES ARE WEARING ALL NECESSARY SAFETY EQUIPMENT (N) UPON COMPLETION OF THE REMOVAL OF THE BUILDINGS, FOUNDATIONS AND OTHER ITEMS, THE SITE SHALL BE RAKED CLEAN AND LEVELED TO RESULTING GRADES. NOTE: DO NOT LEAVE ANY HOLES, DIPS OR ANY OTHER TRIPPING HAZARDS AT THE SITE (0) THE SUPERVISOR WILL KEEP A DAILY WRITfEN LOG OF ALL JOB ACTIVITIES AND TURN THE LOGS INTO THE OFFICE ON A WEEKLY BASIS OR UPON COMPLETION WlllCHEVER OCCURS FIRST c ALWAYS REMEMBER!! NOTIllNG IS AS IMPORTANT AS THE SAFETY AND WELL BEING OF OUR EMPLOYEES AND THE PROTECTION OF PROPERTY AT THE JOBSITE. SO NEVER TAKE UNNECESSARY RISKS AND IF ANY TASK APPEARS TO PRESENT AN UNUSUAL RISK, CALL TO DISCUSS THE SITUA nON WITH OTHER MEMBERS OF THE MANAGEMENT TEAM PRIOR TO PROCEEDING, c () C~ Co' Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES, INC. Cross Construction Services, Inc. 25221 Wesley Chapel Blvd. Lutz, FL 33559 2011 DEMOLITION SA TETY PLAN 1 (~ c c,! Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES. INC. INDEX DEMOLITION SAFETY PLAN 1. DEMOLITION SAFETY PLAN 2. DEMOLITION SAFETY PROCEDURES 3 DEMOLITION ENGINEERING SURVEY 4. UTILITY DEMOLITION LOCATIONS 5. MEDICAL SERVICES AND FIRST AID 6. FIRE PREVENTION AND PROTECTION 7. PRE DEMOLITION CONSIDERATIONS 8. STAIRS. PASSAGEWAYS. LADDERS AND CHUTES 9. REMOVAL OF MATERIALS AND SECTIONS 10. REMOVAL OF FLOORS 11. STORAGE OF WASTE MATERIAL 12. REMOVAL OF STEEL CONSTRUCTION 13. SPECIAL STRUCTURES DEMOLITION 14. DEBRIS CLEARANCE 15. DEMOLITION BY DELIBERATE COLLAPSE 16. DEMOLITION PRESTRESSED CONCRETE STRUCTURES 17 . CATEGORIES OF PRE-STRESSED CONSTRUCTION 18. PRETENSION ED MEMBERS 19. MONOLITHIC STRUCTURES 20. WORKING IN CONFINED SPACES 21. SAFE BLASTING PROCEDURES 22. FIRE PRECAUTIONS 23. PERSONNEL SELECTION 2 c Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES, INC. 1. DEMOLITION SAFETY PLAN 1. Demolition work involves many of the hazards associated with construction. 2. However, demolition incurs additional hazards due to unknown factors such as: deviations from the structure's design introduced during construction, approved or unapproved modifications that altered the original design, materials hidden within structural members, and unknown strengths or weaknesses of construction materials. 3. To counter these unknowns, all personnel involved in a demolition project will be fully aware of these types of hazards and the safety precautions to take to control the hazards. 2. DEMOLITION SAFETY PROCEDURES 1. Before the start of every demolition job, Cross Construction Services, Inc. will take a number of steps to safeguard the health and safety of workers at the job site. C 2. These preparatory operations involve the overall planning of the demolition job, including the methods to be used to bring the structure down, the equipment necessary to do the job, and the measures to be taken to perform the work safely. 3. Planning for a demolition job is as important as actually doing the work. Therefore, a competent person experienced in all phases of the demolition work to be performed will perform all planning work. 3. DEMOLITION ENGINEERING SURVEY 1. Prior to starting all demolition operations, OSHA Standard 1926.850(a) requires that a competent person will conduct an engineering survey of the structure. 2. The purpose of this survey is to determine the condition of the framing, floors, and walls so that measures can be taken, if necessary, to prevent the premature collapse of any portion of the structure. 3. When indicated as advisable, any adjacent structure(s) or improvements will also be similarly checked. 4. Cross Construction Services, Inc. will maintain a written copy of this survey. G 5. Photographing existing damage in neighboring structures will also take place by the competent designated person. 3 c Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES, INC. 6. The engineering survey provides Cross Construction Services, Inc. with the opportunity to evaluate the job in its entirety. 7. Cross Construction Services, Inc. will plan for the wrecking of the structure, the equipment to do the work, manpower requirements, and the protection of the public. The safety of all workers on the job site will be a prime consideration. 8. During the preparation of the engineering survey, Cross Construction Services, Inc. will plan for potential hazards such as fires, cave-ins, and injuries. 9. If the structure to be demolished has been damaged by fire, flood, explosion, or some other cause, appropriate measures, including bracing and shoring of walls and floors, will be taken to protect workers and any adjacent structures. 10. It will also be determined if any type of hazardous chemicals, gases, explosives, flammable material, or similar dangerous substances have been used or stored on the site. 11. If the nature of a substance cannot be easily determined, samples will be taken and analyzed by a qualified person prior to demolition. c: 4. UTILITY DEMOLITION LoeA TIONS 1. One of the most important elements of the pre-job planning is the location of all utility services. 2. All electric, gas, water, steam, sewer, and other services lines will be shut off, capped, or otherwise controlled, at or outside the building before demolition work is started. 3. In each case, any utility company that is involved will be notified in advance, and its approval or services, if necessary, will be obtained. 4. If it is necessary to maintain any power, water, or other utilities during demolition, such lines will be temporarily relocated as necessary and/or protected. 5. The location of all overhead power sources will also be determined, as they can prove especially hazardous during any machine demolition. 6. All workers will be informed of the location of any existing or relocated utility service. c 7. The telephone numbers of the local police, ambulance, and fire departments will be available at each job site. This information can prove useful to the job supervisor in the event of any traffic problems, such as the movement of equipment to or from the job site. 4 c c: (, Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES, INC. 5. MEDICAL SERVICES AND FIRST AID 1. Prior to starting work, provisions will be made for prompt medical attention in case of serious injury. 2. The nearest hospital. infinnary, clinic, or physician will be located as part of the engineering survey. 3. The job supervisor will be provided with instructions for the most direct route to these facilities. 4. Proper equipment for prompt transportation of an injured worker, as well as a communication system to contact any necessary ambulance service, will be available at the job site. 5. The telephone numbers of the hospitals, physicians, or ambulances will be conspicuously posted. 6. A properly stocked first aid kit as detennined by an occupational physician will be available at the job site. 7. The first aid kit will contain approved supplies in a weatherproof container with individual sealed packages for each type of item. It will also include rubber gloves to prevent the transfer of infectious diseases. 8. Provisions will also be made to provide for quick drenching or flushing of the eyes for any person is working around corrosive materials. Eye flushing will be done with water containing no additives. 9. The contents of the kit will be checked before being sent out on each job and at least weekly to ensure the expended items are replaced. 6. FIRE PREVENTION AND PROTECTION A "fire plan" will be set up prior to beginning a demolition job. This plan will outline the assignments of key personnel in the event of a fire and provide an evacuation plan for workers on the site. Common sense will be the general rule in all fire prevention planning: Preparatory Operations: 1. Cross Construction Services, Inc. will be responsible for the development of a fire protection program to be followed throughout all phases of the construction and demolition work, and provide for the firefighting equipment as specified. 2. As fire hazards occur, there will be no delay in providing the necessary equipment. 5 () Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES. INC. 3. When employees are required to work within a structure to be demolished which has been damaged by fire, flood, explosion, or other cause. the walls or floor will be shored or braced. 4. All electric, gas, water, steam, sewer, and other service lines will be shut off, capped, or otherwise controlled. outside the building line before demolition work is started. In each case, any utility company that is involved will be notified in advance. 5. If it is necessary to maintain any power, water or other utilities during demolition, such lines will be temporarily relocated, as necessary, and protected. 6. Where a hazard exists from fragmentation of glass, such hazards will be removed. 7. It will also be determined if any type of hazardous chemicals, gases. explosives, flammable materials, or similarly dangerous substances have been used in any pipes, tanks, or other equipment on the property. 8. When the presence of any such substances is apparent or suspected, testing and purging will be performed and the hazard eliminated before demolition is started. C~ 9. Access to all available firefighting equipment will be maintained at all times. 10. All firefighting equipment, provided by Cross Construction Services, Inc., will be conspicuously located. 11. All firefighting equipment will be periodically inspected and maintained in operating condition. Defective equipment will be immediately replaced. 12. As warranted by the project, Cross Construction Services, Inc. will provide a trained and equipped firefighting organization (Fire Brigade) to assure adequate protection to life. 13. Where a hazard exists to employees falling through wall openings, the opening will be protected to a height of approximately 42 inches. 14. When debris is dropped through holes in the floor without the use of chutes, the area onto which the material is dropped will be completely enclosed with barricades not less than 42 inches high and not less than 6 feet back from the projected edge of the opening above. 15. Signs, warning of the hazard of falling materials, will be posted at each level. Removal will not be permitted in this lower area until debris handling ceases above. 16. All floor openings, not used as material drops, will be covered over with material substantial enough to support the weight of any load that will be imposed. Such material will be properly secured to prevent its accidental movement. 6 c c: c Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES. INC. 17. Except for the cutting of holes in floors for chutes, holes through which to drop materials, preparation of storage space, and similar necessary preparatory work, the demolition of exterior walls and floor construction will begin at the top of the structure and proceed downward. 18. Each story of exterior wall and floor construction will be removed and dropped into the storage space before commencing the removal of exterior walls and floors in the story next below. 19. Employee entrances to multi-story structures being demolished will be completely protected by sidewalk sheds or canopies, or both, providing protection from the face of the building for a minimum of 8 feet. All such canopies will be at least 2 feet wider than the building entrances or openings (1 foot wider on each side thereof), and will be capable of sustaining a load of 150 pounds per square foot. 20. During the planning stage of the job, Cross Construction Services, Inc. will determine all needed safety equipment The required number and type of respirators, lifelines, warning signs, and safety nets, special face and eye protection, hearing protection, and other worker protection. 21. In the absence of an infirmary, clinic, hospital, or physician that is reasonably accessible in terms of time and distance to the work site, a person who has a valid certificate in first aid training will be available at the work site to render first aid. 22. A comprehensive first aid plan is necessary for any confined space entry. 7. PRE DEMOLITION CONSIDERATIONS 1. All potential sources of ignition will be evaluated and the necessary corrective measures taken. 2. When storing debris or combustible material inside a structure, such storage will not obstruct or adversely affect the means of exit. 3. Electrical wiring and equipment for providing light, heat, or power will be installed by a competent person and inspected regularly, 4. Electrical wiring and equipment for providing light, heat, or power will be installed by a competent person and inspected regularly. 5. A suitable location at the job site will be designated and provided with plans, emergency information, and equipment, as needed. 6. Access for heavy fire-fighting equipment will be provided on the immediate job site at the start of the job and well maintained until the job is completed. 7 () Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES, INC. 7. Equipment powered by an internal combustion engine will be located so that the exhausts discharge away from combustible materials and away from workers. 8. When the exhausts are piped outside the building, clearance of at least six inches will be maintained between such piping and combustible material. 9. Free access from the street to fire hydrants and to outside connections for standpipes, sprinklers, or other fire extinguishing equipment, whether permanent or temporary, will be provided and maintained at all times. 10. All internal combustion equipment will be shut down prior to refueling. Fuel for this equipment will be stored in a safe location. 11. Pedestrian walkways will not be so constructed as to impede access to hydrants. 12. Sufficient fire fighting equipment will be located near any flammable or combustible liquid storage area. C~ 13. Only approved containers and portable tanks will be used for the storage and handling of flammable combustible liquids. 14. No material or construction will interfere with access to hydrants, Siamese connections, or fire-extinguishing equipment. 15. A temporary or permanent water supply of volume, duration, and pressure sufficient to operate the fire-fighting equipment properly will be made available. 16. Standpipes with outlets will be provided on large multistory buildings to provide for fire protection on upper levels. If the, water pressure is insufficient, a pump will also be provided. 17. Heating devices will be situated so they are not likely to overturn and will be installed in accordance with their listing, including clearance to combustible material or equipment. 18. Competent personnel will maintain temporary heating equipment, when utilized. 19. An ample number of fully charged portable fire extinguishers would be provided throughout the operation. All motor driven mobile equipment will be equipped with an approved fire extinguisher. 20. Roadways between and around combustible storage piles will be at least 15 feet wide and maintained free from accumulation of rubbish, equipment, or other materials, 21. Smoking will be prohibited at or in the vicinity of hazardous operations or materials. Where smoking is permitted, safe receptacles will be provided for smoking materials. 8 c Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES. INC. 22. An alarm system, e.g., telephone system, siren, two-way radio, etc. will be established in such a way that employees on the site and the local fire department can be alerted in case of an emergency. 23. The alarm code and reporting instructions will be conspicuously posted and the alarm system will be serviceable at the job site during the demolition. 24. Fire cutoffs will be retained in the buildings undergoing alterations or demolition until operations necessitate their removal. 8. STAIRS. PASSAGEWAYS. LADDERS AND CHUTES 1. Only those stairways, passageways, and ladders, designated as means of access to the structure of a building, will be used. Other access ways will be entirely closed at all times. 2. All stairs, passageways, ladders and incidental equipment thereto, which are covered by this section, will be periodically inspected and maintained in a clean safe condition. .... 3. In a multistory building, when a stairwell is being used, it will be properly illuminated by ; either natural or artificial means, and completely and substantially covered over at a point not less than two floors below the floor on which work is being performed, and access to the floor where the work is in progress will be through a properly lighted, protected, and separate passageway. 4. No material will be dropped to any point lying outside the exterior walls of the structure unless the area is effectively protected. 5. All materials chutes or sections thereof, at an angle of more than 450 from the horizontal, will be entirely enclosed, except for openings equipped with closures at or about floor level for the insertion of materials. 6. The openings will not exceed 48 inches in height measured along the wall of the chute. 7. At all stories below the top floor, such openings will be kept closed when not in use. 8. A substantial gate will be installed in each chute at or near the discharge end. A competent employee will be assigned to control the operation of the gate, and the backing and loading of trucks. 9. When operations are not in progress, the area surrounding the discharge end of a chute will be securely closed off. C~ 10. A substantial guardrail will protect any chute opening, into which workmen dump debris, approximately 42 inches above the floor or other surface on which the men stand to dump the material. 9 "' Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES. INC. 11. Any space between the chute and the edge of openings in the floors through which it passes will be solidly covered over. 12. Where the material is dumped from mechanical equipment or wheelbarrows, a securely attached toe board or bumper, not less than 4 inches thick and 6 inches high, will be provided at each chute opening. 13. Chutes will be designed and constructed of such strength as to eliminate failure due to impact of materials or debris loaded therein. 14. Except for the cutting of holes in floors for chutes, holes through which to drop materials, preparation of storage space, and similar necessary preparatory work, the demolition of exterior walls and floor construction will begin at the top of the structure and proceed downward. 15. Each story of exterior wall and floor construction will be removed and dropped into the storage space before commencing the removal of exterior walls and floors in the story next below. c. 16. Employee entrances to multistory structures being demolished will be completely protected by sidewalk sheds or canopies, or both, providing protection from the face of the building for a minimum of 8 feet. 17. All such canopies will be at least 2 feet wider than the building entrances or openings (1 foot wider on each side thereof), and will be capable of sustaining a load of 150 pounds per square foot. 9. REMOVAL OF MATERIALS AND SECTIONS 1. Any openings cut in a floor for the disposal of materials will be no larger in size than 25 percent of the aggregate of the total floor area, unless the lateral supports of the removed flooring remain in place. 2. Floors weakened or otherwise made unsafe by demolition operations will be shored to carry safely the intended imposed load from demolition operations. 3. Masonry walls, or other sections of masonry, will not be permitted to fall upon the floors of the building in such masses as to exceed the safe carrying capacities of the floors. 4. No wall section, which is more than one story in height, will be permitted to stand-alone without lateral bracing, unless such wall was originally designed and constructed to stand without such lateral support, and is in a condition safe enough to be self- supporting. 5. All walls will be left in a stable condition at the end of each shift. 10 c Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES. INC. 6. Employees will not be permitted to work on the top of a wall when weather conditions constitute a hazard. 7. Structural or load-supporting members on any floor will not be cut or removed until all stories above such a floor have been demolished and removed. 8. This provision will not prohibit the cutting of floor beams for the disposal of materials or for the installation of equipment. 9. Floor openings within 10 feet of any wall being demolished will be planked solid, except when employees are kept out of the area below. 10. In buildings of Uskeleton-steel" construction, the steel framing will be left in place during the demolition of masonry. Where this is done, all steel beams, girders, and similar structural supports will be cleared of all loose material as the masonry demolition progresses downward. 11. Walkways or ladders will be provided to enable employees to safely reach or leave any scaffold or wall. (, 12. Walls, which serve as retaining walls to support earth or adjoining structures, will not be demolished until such earth has been properly braced or adjoining structures have been properly underpinned. 13. Walls, which are to serve, as retaining walls against which debris will be piled, will not be so used unless capable of safely supporting the imposed load. 10. REMOVAL OF FLOORS 1. Openings cut in a floor will extend the full span of the arch between supports. 2. Before demolishing any floor arch, debris and other material will be removed from such arch and other adjacent floor area. 3. Planks not less than 2 inches by 10 inches in cross section, full size undressed, will be provided for, and will be used by employees to stand on while breaking down floor arches between beams. 4. Such planks will be so located as to provide a safe support for the workmen will the arch between the beams collapse. The open space between planks will not exceed 16 inches. c 5. Safe walkways, not less than 18 inches wide, formed of planks not less than 2 inches thick if wood, or of equivalent strength if metal, will be provided and used by workmen when necessary to enable them to reach any point without walking upon exposed beams. 11 C~ Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES, INC. 6. Stringers of ample strength will be installed to support the flooring planks, and the ends of such stringers will be supported by floor beams or girders, and not by floor arches alone. 7. Planks will be laid together over solid bearings with the ends overlapping at least 1 foot. 8. When floor arches are being removed, employees will not be allowed in the area directly underneath, and such an area will be barricaded to prevent access to it. 9. Demolition of floor arches will not be started until they, and the surrounding floor area for a distance of 20 feet, have been cleared of debris and any other unnecessary materials. 10. Mechanical equipment will not be used on floors or working surfaces unless such floors or surfaces are of sufficient strength to support the imposed load. 11. Floor openings will have curbs or stop-logs to prevent equipment from running over the edge. 11. STORAGE OF WASTE MATERIAL 1. The storage of waste material and debris on any floor will not exceed the allowable floor loads. 2. In buildings having wooden floor construction, the flooring boards will be removed from not more than one floor above grade to provide storage space for debris, provided falling material is not permitted to endanger the stability of the structure. 3. When wood floor beams serve to brace interior walls or freestanding exterior walls, such beams will be left in place until other equivalent support can be installed to replace them. 4. Floor arches, to an elevation of not more than 25 feet above grade, will be removed to provide storage area for debris: Provided that such removal does not endanger the stability of the structure. 5. Storage space into which material is dumped will be blocked off, except for openings necessary for the removal of material. Such openings will be kept closed at all times when material is not being removed. c 12 ... Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES, INC. 12. MECHANICAL DEMOLITION WITH CRANE 1. During the demolition operations, when balling or clamming are being performed. Only those workers necessary for the performance of the operations will be permitted in this area at any other time. 2. The crane boom and load line will be as short as possible. 3. The weight of the demolition ball will not exceed 50 percent of the crane's rated load, based on the length of the boom and the maximum angle of the operation at which the demolition ball will be used, or it will not exceed 25 percent of the nominal breaking strength of the line by which it is suspended, whichever results in a lesser value. 4. The ball will be attached to the load line with a swivel-type connection to prevent twisting of the load line, and will be attached by positive means in such manner that the weight cannot become aCcidentally disconnected. 5. When pulling over walls or portions thereof, all steel members affected will have been previously cut free. (, 6. All roof cornices or other such ornamental stonework will be removed prior to pulling walls over. 7. During demolition, continuing inspections by a competent person will be made as the work progresses to detect hazards resulting from weakened or deteriorated floors, or walls, or loosened material. 8. No employee will be permitted to work where such hazards exist until they are corrected by shoring, bracing, or other effective means. 13. SPECIAL STRUCTURES DEMOLITION Safe work practices when demolishing a chimney, stack, silo, or cooling tower will include the following procedures: Inspection and planning: 1. When preparing to demolish any chimney, stack, silo, or cooling tower, the first step will be a careful, detailed inspection of the structure by an experienced person. 2. If possible, architectural/engineering drawings will be consulted, 3. Particular attention will be paid to the condition of the chimney or stack. c 4. Workers will be on the lookout for any structural defects such as weak or acid-laden mortar joints, and any cracks or openings. 13 c Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES, INC. 5. The interior brickwork in some sections of industrial chimney shafts can be extremely weak. If the stack has been banded with steel straps, these bands will be removed only as the work progresses from the top down. 6. Sectioning of the chimney by water, etc. will be considered. Safe work practices: 1. When hand demolition is required, it will be carried out from a working platform. 2. Experienced personnel will install a self-supporting tubular scaffold, suspended platform, or knee-braced scaffolding around the chimney. 3. Particular attention will be paid to the design, support, and tie-in (braces) of the scaffold. 4. A competent person will be present at all times during the erection of the scaffold. 5. It is essential that there be adequate working clearance between the chimney and the work platform. 6. Access to the top of the scaffold will be provided by means of portable walkways. 7. The platforms will be decked solid and the area from the work platform to wall bridged with a minimum of two-inch thick lumber. 8. A top rail 42 inches above the platform, with a mid-rail covered with canvas or mesh will be installed around the perimeter of the platform to prevent injury to workers below. Debris netting will be installed below the platform. 9. Excess canvas or plywood attachments can form a wind-sail that could collapse the scaffold. 10. When working on the work platform, all personnel will wear hard hats, long-sleeve shirts, and eye and face protection, such as goggles and face shields, respirators, and safety belts, as required. 11. Care will be taken to assign the proper number of workers to the task, 12. Too many people on a small work platform can lead to accidents. c: 13. An alternative to the erection of a self-supporting tubular steel scaffold to "climb" the structure will be a creeping bracket scaffold. 14 () (: (, Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN , CROSS CONSTRUCTION SERVICES. INC. 14. The supervisor will make careful inspection of the masonry as to the safety of the alternative. It is essential that the masonry of the chimney be in good enough condition to support the bracket scaffold. 15. The area around the chimney will be roped off or barricaded and secured with appropriate warning signs posted. No unauthorized entry will be permitted to this area. It is also good practice to keep a worker, i.e., a supervisor, operating engineer, another worker, or a "safety person," on the ground with a form of communication to the workers above. 16. Special attention will be paid to weather conditions when working on a chimney. No work will be done during inclement weather such as during lightning or high wind situations. The work site will be wet down, as needed, to control dust. 14. DEBRIS CLEARANCE If debris is dropped inside the shaft, it can be removed through an opening in the chimney at grade level. 1. The opening at grade will be kept relatively small in order not to weaken the structure. 2. If a larger opening is desired, a professional engineer will be consulted. 3. When removing debris by hand, an overhead canopy of adequate strength will be provided. 4. If machines are used for removal of debris, proper overhead protection for the operator will be used. 5. Excessive debris will not be allowed to accumulate inside or outside the shaft of the chimney as the excess weight of the debris can impose pressure on the wall of the structure and might cause the shaft to collapse. 6. The foreman will determine when debris is to be removed, halt all demolition during debris removal, and make sure the area is clear of cleanup workers before continuing demolition. 15. DEMOLITION BY DELIBERATE COLLAPSE 1. Another method of demolishing a structures, chimneys, or stacks are by deliberate collapse. 2. Deliberate collapse requires extensive planning and experienced personnel, and will be used only when conditions are favorable. o 3. There will be a clear space for the fall of the structure of at least 45 on each side of the intended fall line and 1 % times the total height of the chimney. Considerable vibration will be set up when the chimney falls, so there will be no sewers or underground services on the line of the fall. 15 c c c. Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES, INC. 4. Lookouts will be posted on the site and warning signals will be arranged. The public and other workers at the job site will be kept well back from the fall area. 5. The use of explosives is one way of setting off deliberate collapse. Only qualified persons will complete this type of demolition. 6. The entire work area will be cleared of nonessential personnel before any explosives are placed. 7. Though the use of explosives is a convenient method of bringing down a chimney or stack, there is a considerable amount of vibration produced, and caution will be taken if there is any likelihood of damage. 16. DEMOLITION PRESTRESSED CONCRETE STRUCTURES 1. The different forms of construction used in a number of more or less conventional structures built during the last few decades will give rise to a variety of problems when the time comes for them to be demolished. 2. Pre-stressed concrete structures fall in this general category. The most important aspect of demolishing a pre-stressed concrete structure takes place during the engineering survey. 3. During the survey, a qualified person will determine if the structure to be demolished contains any pre-stressed members. 4. It is the responsibility of Cross Construction Services, Inc. to inform all workers on the demolition job site of the presence of pre-stressed concrete members within the structure. 5. Cross Construction Services, Inc. will also instruct them in the safe work practice that will be followed to safely perform the demolition. 6. Workers will be informed of the hazards of deviating from the prescribed procedures and the importance of following their supervisor's instruction. 17. CATEGORIES OF PRE-STRESSED CONSTRUCTION There are four main categories of pre-stressed members. The category or categories will be determined before attempting demolition, bearing in mind that any pre-stressed structure will contain elements of more than one category. 1. Category 1- Members are pre-stressed before the application of the superimposed loads, and all cables or tendons are fully bonded in the concrete or grouted within ducts. 16 I c c~ (, Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES. INC. 2. Categories 2- Like Category 1, but the tendons are left ungrouted. This type of construction can sometimes be recognized from the access points that will have been provided for inspection of the cables and anchors. More recently, un-bonded tendons have been used in the construction of beams, slabs, and other members; these tendons are protected by grease and surrounded by plastic sheathing, instead of the usual metal duct. 3. Category 3 Members are pre-stressed progressively as building construction proceeds and the dead load increases, using bonded tendons as in Category 1. 4. Category 4 Like Category 3, but using un-bonded tendons as in Category 2. 5. Examples of construction using members of Categories 3 or 4 are relatively rare. However, they will be found, for example, in the podium of a tall building or some types of bridges. They require particular care in demolition. 18. PRETENSIONED MEMBERS 1. These usually do not have any end anchors, the wires being embedded or bonded within the length of the member. 2. Simple pre-tensioned beams and slabs of spans up to about 23 feet can be demolished in a manner similar to ordinary reinforced concrete, 3. Pre-tensioned beams and slabs will be lifted and lowered to the ground as complete units after the removal of any composite concrete covering to tops and ends of the units. 4. To facilitate breaking up, the members will be turned on their sides. 5. Lifting from the structure will generally be done from points near the ends of the units or from lifting point positions. 6. Reuse of lifting eyes, if in good condition, is recommended whenever possible. When units are too large to be removed, consideration will be given to temporary supporting arrangements. 7. Pre-cast units stressed separately from the main frames of the structure, with end anchors and grouted and un-grouted ducts: 8. Before breaking up, units of this type will be lowered to the ground, if possible. It is advisable to seek the counsel of a professional engineer before carrying out this work, especially where there are un-grouted tendons, 9. In general, this is true because grouting is not always 100% efficient. After lowering the units can be turned on their side with the ends up on blocks after any composite concrete is removed. 17 c Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES. INC. 10. This will suffice to break the unit and release the pre-stress; if not, a sand bag screen, timbers, or a blast mat as a screen will be erected around the ends and demolition commenced, taking care to clear the area of any personnel. The end blocks will be heavily reinforced and difficult to break up. 19. MONOLITHIC STRUCTURES 1. The advice of the professional engineer experienced in pre-stressed work will be sought before any attempt is made to expose the tendons or anchorages of structures in which two or more members have been stressed together. 2. It will usually be necessary for temporary supports to be provided so the tendons and the anchorage can be cautiously exposed. In these circumstances it is essential that indiscriminate attempts to expose and de-stress the tendons and anchorages not be made. (: 3. In the case of progressively pre-stressed structures, it is essential to obtain the advice of a professional engineer, and to demolish the structure in strict accordance with the engineer's method of demolition. 4. The stored energy in this type of structure is large. In some cases, the inherent properties of the stressed section will delay failure for some time, but the presence of these large prestressing forces will cause sudden and complete collapse with little warning. 20. WORKING IN CONFINED SPACES 1. Cross Construction Services, Inc. often comes in contact with confined spaces when demolishing structure at industrial sites. 2. These confined spaces can be generally categorized in two major groups: those with open tops and a depth that restricts the natural movement of air, and enclosed spaces with very limited openings for entry, 3. Examples of these spaces include storage tanks, vessels, degreasers, pits vaults, casing, and si105. 4. The hazards encountered when entering and working in confined spaces are capable of causing bodily injury, illness, and death. 5. Accidents occur among workers because of failure to recognize that a confined space is a potential hazard. 18 C~ Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES, INC. 6. It will therefore be considered that the most unfavorable situation exists in every case and that the danger of explosion, poisoning, and asphyxiation will be present at the onset of entry. 21. SAFE BLASTING PROCEDURES 1. Prior to the blasting of any structure or portion thereof, a complete written survey will be made by a qualified person of all adjacent improvements and underground utilities. 2. When there is a possibility of excessive vibration due to blasting operations, seismic or vibration tests will be taken to determine proper safety limits to prevent damage to adjacent or nearby buildings, utilities, or other property. 3. The preparation of a structure for demolition by explosives will require the removal of structural columns, beams or other building components. 4. This work will be directed by a structural engineer or a competent person qualified to direct the removal of these structural elements. .... 5. Extreme caution will be taken during this preparatory work to prevent the weakening and premature collapse of the structure. " 6. The use of explosives to demolish smokestacks, silos, cooling towers, or similar structures o will be permitted only if there is a minimum of 90 of open space extended for at least 150% of the height of the structure or if the explosives specialist can demonstrate consistent previous performance with tighter constraints at the site. 22. FIRE PRECAUTIONS 1. The presence of fire near explosives presents a severe danger. Every effort will be made to ensure that fires or sparks do not occur near explosive materials. 2. Smoking, matches, firearms, open flame lamps, and other fires, flame, or heat-producing devices will be prohibited in or near explosive magazines or in areas where explosives are being handled, transported, or used. In fact, persons working near explosives will not even carry matches, lighters, or other sources of sparks or flame. 3. Open fires or flames will be prohibited within 100 feet of any explosive materials. In the event of a fire that is in imminent danger of contact with explosives, all employees will be removed to a safe area, 4. Electrical detonators can be inadvertently triggered by stray RF (radio frequency) signals from two-way radios. RF signal sources will be restricted from or near to the demolition site, if electrical detonators are used. 19 c; Cross Construction Services, Inc. @ 2011 DEMOLITION SAFETY PLAN CROSS CONSTRUCTION SERVICES. INC. 23. PERSONNEL SELECTION 1. A blaster is a competent person who uses explosives. A blaster will be qualified by reason of training, knowledge, or experience in the field of transporting, storing, handling, and using explosives. 2. In addition, the blaster will have a working knowledge of state and local regulations that pertain to explosives. 3. Training courses are often available from manufacturers of explosives and blasting safety manuals are offered by the Institute of Makers of Explosives (I M E) as well as other organizations. 4. Blasters will be required to furnish satisfactory evidence of competency in handling explosives and in safely performing the type of blasting required. 5. A competent person will always be in charge of explosives and will be held responsible for enforcing all recommended safety precautions in connection with them. () c: 20 c 25221 Wesley Chapel Blvd. Lutz, FL 33559 PII:(813)907-1013 FAX:(813)907-0297 · 16050 Collins Ave. Sunny Isles Beach Demolition of one story block building and associated foundations CCS to provide demolition permit from City of Sunny Isles Removal of Asphalt and base materials CCS to provide pre-demolition asbestos survey CCS to provide boundary & topographic survey CCS to co-ordinate and pay for utility disconnects CCS to provide temporary chain link construction fence and wind-screen All demolition debris will be taken to a certified recycler or landfill Site will be rough graded to resulting elevation. c Demolition Total - $ 52,850..00 16100 Collins Ave. Sunny Isles Beach Demolition of one story block building and associated foundations CCS to provide demolition permit from City of Sunny Isles Removal of Asphalt and base materials CCS to provide pre-demolition asbestos survey CCS to provide boundary & topographic survey CCS to co-ordinate and pay for utility disconnects CCS to provide temporary chain link construction fence and wind-screen All demolition debris will be taken to a certified recycler or landfill Site will be rough graded to resulting elevation. Demolition Total - $ 60,150.00 151 Sunny Isles Blvd. Sunny Isles Beach Demolition of one story block buildings (2) and associated foundations CCS to provide demolition permit from City of Sunny Isles Removal of Asphalt and base materials CCS to provide pre-demolition asbestos survey CCS to provide boundary & topographic survey CCS to co-ordinate and pay for utility disconnects CCS to provide temporary chain link construction fence and wind-screen All demolition debris will be taken to a certified recycler or landfill Site will be rough graded to resulting elevation, c Demolition Total - $ 106,370.00 c 215 Sunny Isles Blvd. Sunny Isles Beach Demolition of one story block buildings (2) and associated foundations CCS to provide demolition permit from City of Sunny Isles Removal of Asphalt and base materials CCS to provide pre-demolition asbestos survey CCS to provide boundary & topographic survey tcs to co-ordinate and pay for utility disconnects CCS to provide temporary chain link construction fence and wind-screen All demolition debris will be taken to a certified recycler or landfill Site will be rough graded to resulting elevation, Demolition Total - $ 103,180.00 Demolition Grand Total - $ 322,550.00 c ~ c 25221 Wesley Chapel Blvd, Lutz, Florida 33559 Phone: (813) 907-1013 . Fax: (813) 907-0297 References General Contractors: 1. DeLotto 924 East Busch Boulevard Tampa, FL 33612 Contact: Mr. Jay Wooley Telephone: 813/935-2191 2. Walbridge Alclinger 3415 North 16th Street Tampa, FL 33605 Contact: Mr. Nelson Etienne 813/622-8900 c 3. Skanska Builcling USA Inc. 4950 W. Kennedy Blvd., Suite 600 Tampa, FL 33609 Contact: Mr. Charles Bauerlein Telephone: 813/917-0003 Consultants: 1. me Engineering Environmental & Construction liC 8875 Hidden River Parkway, Suite 300 Tampa, FL 33637 Contact: Mr. Orie Voigtmann Telephone: 813/714-9971 2. American Management Resources Corporation 5230 Clayton Court Fort Myers, FL 33904 Contact: Mr. Jack Snider, ill Telephone: 239/936-8266 c 3. Greenfield Environmental, Ine. 432 3rd Street North S1. Petersburg, FL 33701 Contact: Mr. Jim Greenfield Telephone: 727/896-1266 (; Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: c Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Client: Project: Scope of Work: Contract Amount: % Complete: Completion Date: Contact: c Page 2 25221 Wesley Chapel Blvd. Lutz, Florida 33559 Phone: (813) 907-1013' Fax: (813) 907-0297 Government Demolition Experience Hillsborough Community College Dale Mabry Campus, Tampa, FL W.T. Edwards Hospital Tampa, FL Demolition of Five Story Building & 15 Out-parcels (Approximately 297,000 SF) & Asbestos Abatement $595,675.00 August 2007 (30 days ahead of schedule) Mr. Orie Voigtmann 813/714-9971 Hillsborough County Aviation Authority Tampa International Airport Drew Park Acquisition Program Tampa, FL Asbestos Abatement & Structural Demolition $290,442.50 May 2009 Mr. Keith Fleming, P.G., Environmental Manager 813/870-7839 Ajax Building Corporation Gulfport, FL Boca Ciega High School Pinellas County School Board Asbestos Abatement & Structural Demo $362,876.00 100% October 2010 (Phased Job) Mr. Bob Dennis 727/341-2529 Continued - Page 2 Cross Construction Services, Inc. c c c Client: Florida Department of Transportation - District 5 719 S. Woodland Blvd., MS4-501 Deland, FL 32720 Right-of-Way Acquisition Program for Brevard, Flagler, Lake, Marion, Orange, Osceola, Seminole, Sumter and Volusia Counties Asbestos Abatement/Demolition $600,000+ 3 year Term Contract Ms. Florence Fowler (florence.fowler@dot.state.fl.us) 386/943-5088 Project: Scope of Work: Contract Amount: Completion Date: Contact: Client: W. G. Mills Jacksonville, FL Project: Beach High School Savannah, GA Scope of Work: Complete demolition and site work of Former Hodge Elementary Contract Amount: $251,013.00 Completion Date: April 2011 Contact: Mr. Jason Burt 904/281-7718 c Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: c Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Client: Scope of Work: Contract Amount: Contact: c ()1> ~ "-> 06' ~\.c 6' cONSTRUCTION S~~ 25221 State Road 54 West Lutz, Florida 33559 Office: (813) 907-1013 Fax: (813) 907-0297 FL Term Contracts Florida Department of Transportation - District 5 719 S. Woodland Blvd., MS4-501 Deland, FL 32720 Right-of-Way Acquisition Program for Brevard, Flagler, Lake, Marion, Orange, Osceola, Seminole, Sumter and Volusia Counties Asbestos Abatement/Demolition $600,000+ 3 year Term Contract - October 2010 Ms. Florence Fowler (florence.fowler@dot.state.fl.us) 386/943-5088 Florida Department of Transportation District 1 - Bartow, FL 3 Year Term Contract for Demolition Services 2007 - 2010 Demolition of Structures (wet demolition as required) $200,000 per year approximate. July 2010 Mr. Gregory Bohde - (gregory.bohde@dot.state.fl.us) 863/519-2434 Florida Department of Transportation District #2 1109 Marion Avenue-Mail Station 2020 Lake City, FL 32025-7476 Term Contact #DM092 for the Structural Demolition of Commercial and Residential Structures for Right-of-Way Acquisition Project - 18 counties $50,000+ Ms. Julie McNeill - (julie.mcneill@dot.state.fl.us) 386/961-7476 c Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: c Clien t: Project: Scope of Work: Contract Amount: Completion Date: Contact: Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: c 25221 Wesley Chapel Blvd, Lutz, Florida 33559 Phone: (813) 907-1013' Fax: (813) 907-0297 Recent Demolition/Implosion Experience Cytec Industries West Patterson, New Jersey Brewster Facility Brewster, FL Structural Demolition & Asbestos of Former Fertilizer Plant $669,026.00 February 2009 Mr. Tony Marek 973/569-4009 K & P Clearwater Estates, LLC & The Related Group - Tampa, FL Spyglass Hotel Implosion/Demolition Clearwater Beach, FL Nationally televised - Criss Angel Mindfreak on A & E Television July 30, 2008 Asbestos Abatement and Implosion of nine story hotel and debris removal of 3,000 tons $350,000.00 August 14, 2008 Mr. Eric Fordin 305/533-0001 Tampa Electric Company Polk Power Station By-Product Transfer State Road 37 - Mulberry, FL Relocation of slag/ash by-product from a third party owned facility to TECO owned facility in Mulberry $677,604.85 October, 2007 Mr. Thomas Hargrave, Manager-Generation Contracts TECO - 813/228-1060 c c c Page 2 Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Cross Construction Services, Inc. Hillsborough Community College Dale Mabry Campus, Tampa, FL W.T. Edwards Hospital Tampa, FL Demolition of Five Story Building & 15 Out-parcels (Approximately 297,000 SF) $ 595,6 75.00 August 2007 (30 days ahead of schedule) Mr. Dave Cabeceiras 813/253-7125 South Florida Water Management District West Palm Beach, FL Picayune Forest - Strand Demolition 140,000 acre wildlife preservation site in Collier County, Florida. Wildlife guidelines established and monitored by District for strict adherence to environmental concerns. Wet Demolition and Clean-up of Miscellaneous Parcels $1,461,000.00 May 2006 Mr. Octavio Castillo, P.E. 561/242-5520, X4035 Chugach Management, Inc. Tampa, FL MacDill Air Force Base Multiple Bldg Demolition Selective Demo and Asbestos Abatement $328,618.00 June 2007 Ms. April Brock, CMSI Contracts Specialist 813/828-0833 c Client: Project: Scope of Work: Contract Amount: Project Date: Contact: c Client: Project: Scope of Work: Contract Amount: Project Date: Contact: Client: Project: Scope of Work: Contract Amount: Project Date: Contact: c 0-<f:l ~~ 08 <oJ.\.v oS CONSTRUCTIO~ S~~ 25221 State Road 54 West Lutz, Florida 33559 Office: (813) 907-1013 Fax: (813) 907-0297 Recent Completed Projects St. Petersburg Times 490 First Avenue South St. Petersburg, FL 33701 Paper Reel Bay and Vencor Room Same Asbestos Abatement - Fireproofing $112,565.00 - Occupied May 2007 - July 2007 Ms. Janet Frazier Henry 727/322-6741 WRD Construction Consultants 495 Old Oak Circle Palm Harbor, FL 34683 St. Petersburg Museum of Fine Arts 255 Beach Drive, St. Petersburg, FL Removal of asbestos containing spray applied texture. $150,600.00 - Occupied August 2007 - MaTch 2008 Mr. Bill DiMarino, P.E. 727/772-5769 Lockheed Martin Corporation 3655 Tampa Road Oldsmar, FL Lockheed Martin Same Asbestos Abatement & Selective Demo $48,000.00 - Occupied October 2007 - April 2008 Mr. Jonathan Poggi 813/854-7408 Continued - Page 2 c c c Page 2 Cross Construction Services, Inc. Current/Completed Projects - continued Client: Project: Scope of Work: Contract Amount: Project Date: Contact: Client: Proj ect: Scope of Work: Contract Amount: Completion Date: Contact: Client: Proj ect: Scope of Work: Contract Amount: Completion Date: Contact: Gulfpoint Construction Co., Inc. 8791 Conference Drive, Suite 1 Fort Myers, FL 33919 Heights Elementary 15200 Alexandria Court Fort Myers, FL 33903 Removal of asbestos containing floor tile & transite from 10 classrooms prior to complete demo of school by CCS $302,230.00 October 2007 - June 2008 Mr. John Huether 239/768-1800 Skanska USA Building Inc. 4950 West Kennedy Blvd., Suite 600 Tampa, H.. 33609 St. Leo University 33701 State Road 54 St. Leo, F1. 33574-6665 Asbestos Abatement at Student Center & Selective Demo $297,480.00 - Campus Occupied August 2007 - October 2007 Mr. Frank Rygiel 813/610-5889 Biltmore Construction Co.,Inc. 1055 Ponce Deleon Blvd Clearwater, FL 33756 University of Florida - Library West Gainesville, FL Asbestos Abatement & Selective Demo $1,024,980.00 - Campus Occupied October 2004 - January 2006 Mr. Bruce Shafer 727/585-2084 Continued Page 3 c ~ ~ ~ ~ Page 3 Cross Construction Services, Inc. Current/Completed Projects - continued Client: Project: Scope of Work: Contract Amount: Project Date: Contact: Client: Project: Scope of Work: Contract Amount: Project Date: Contact: Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Balior Beatty Construction 515 63rd Avenue E Bradenton, FL Daughtrey Elementary (School Board of Manatee County) 7901 S.W. 6th Court Plantation, FL 33327 Removal of asbestos containing pipe insulation, floor tile and Transite@ $256,800.00 - Campus Occupied 11/19/07 - 3/30/08 Mr. Mike Miller 941/753-4327 Stetston University Campus Box 8420 Deland, FL 32720 Emily Hall/Sage HalljPresser Hall Same Removal of asbestos containing floor tile, soil, TSI, roofing $150,000+ - Campus Occupied March 05 - August 07 Mr. Ron Roux 386/822-8807 DeLotto 924 E. Busch Boulevard Tampa, FL 33612 Pinecrest Elementary School (Hillsborough County School) 7950 Lithia Pinecrest Road Litma, FL 33547 Asbestos Abatement and Selective Demo $180,000.00 - Campus Occupied January 08 - April 2008 Mr. Chip Pepper 813/935-2191 Continued - Page 4 c /'" ~ c Page 4 Cross Construction Services, Inc. Current/Completed Projects - continued Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Florida Department of Transportation - District 5 719 S. Woodland Blvd., MS4-501 Deland, FL 32720 Right-of-Way Acquisition Program for Brevard, Flagler, Lake, Marion, Orange, Osceola, Seminole, Sumter and Volusia Counties Asbestos Abatement/Demolition $500,000+ 3 year Term Contract - October 2007 Ms. Florence Fowler 386/943-5088 c c c Client Project Scope of Work Contract Amount Completion Date Contact Client Project Scope of Work Contract Amount Completion Date Contact Client Project Scope of Work Contract Amount Completion Date Contact 25221 Wesley Chapel Blvd, Lutz, Florida 33559 Phone: (813) 907-1013' Fax: (813) 907-0297 Microbial Remediation Completed Projects Jetta Moore, Inc. Webster, FL St. Joseph's Hospital Removal of moisture damaged sheetrock. $10,000,00 + March 2010 Mr. HolHe Moore 352/91E'.-4480 Wehr Construction St. Joseph's Bospital- 3rd FL lCU Removal of moisture damaged sheetrock at exterior walls. Removal of wallpaper in corridors and application of biocide. $66,160.00 February 2010 Mr. John Graves 813/872-0408 Baycare Health Systems Morton Mease Countryside Hospital Remediation of ceramic and vinyl floor tile to remove mold from underneath and removal of partial drywall. $12,000+ February 2010 Ms. Deborah Bartley 727/734-6061 Continued - Page 2 Page 2 c Client Project Scope of Work Contract Amount Completion Date Contact Client Project Scope of Work Contract Amount Completion Date Contact Client: c Project: Scope of Work: Contract Amount: Completion Date: Contact: Client Project Scope of Work Contract Amount Completion Date Contact Client Project Scope of Work c Contract Amount Completion Date Contact Cross Construction Services, Ine. Greenfield Environmental - have provided several: Morton Plant Mease Hospital Fawcett Memorial Hospital Powell Cancer Center Removal of $50,000+ 2009 - 2010 Mr. Jim Greenfield 727/896-1266 Design It, Build It, Inc. Myakka City, F1.. West Boca Medical Center Removal of microbial contaminated materials. $187,900.00 April 2008 Mr. Jeff Faulkner 941/322-0842 Hillsborough County School District Tampa, FL Wimauma Elementary School Mold RemediationjInterior Demo $ 52,600.00 August 2007 Mr. Robin Farmer (e-mail: robin.farmer@sdhc.k12.fl.us) 813/356-1468 1.0. DeLotto & Sons - Tampa, FL Stoeltzing Residence IAQ - drywall removal & replacement $90,000.00 January 2007 Mr. Wayne Fernandez (e-mail: wfernandez@delotto.com) 813/629-0828 Simon Property Group University Mall - Pensacola, FL Removal of water damaged drywall in mall ceiling 60' high ceilings while mall was occupied. 168,500.00 December 2006 Ms. Julie Harrell (e-mail: jharrell@simon.com) 850/478-3601 c ,..... ~ c Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: 0..p ~ ":J 08 ~\V oS CONSTRUCTION S""~ 25221 State Road 54 West Lutz, Florida 33559 Office: (813) 907-1013 Fax: (813) 907-0297 Indoor Air Quality - Recent Completed Projects ].0. DeLotto & Sons Tampa, PI.. Stoeltzing Residence !AQ - drywall removal & replacement $90,000.00 January 2007 Mr. Wayne Fernandez 813/935-2191 Simon Property Group University Mall - Pensacola, PI.. Removal of water damaged drywall in mall ceiling 60' high ceilings while mall was occupied. 168,500.00 December 2006 Ms. Julie Harrell 850/478-3601 ABI, Inc. Tampa, PI.. Regency Oaks Nursing Home Mold Remediation $6,500.00 November 2006 Mr. Bob Brikas 813/289-8808 C 25221 State Road 54 West diJ' Lutz, Florida 33559 Office: (813) 907-1013 Fax: (813) 907-0297 INDOOR AIR QUALITY PROJECT REFERENCES Client R.M. Williams Contractors, Inc. Project Polk County Courthouse, Bartow, FL Contact Mr. R.M. "Mackey" Williams, President 813/ Contract Value $1,300,000.00 Scope Microbial Remediation'of Complete Interior Date of Completion 7/95 Client St. Ignatius Catholic Church Project Same Contact Eldean 813/937-4050 Contract Value $14,723.00 C Scope Duct Cleaning Date of Completion 10/98 Client QST Environmental, Inc. Project Northwest Regional library Contact Mr. Martin E. Millburg 813/287 -2755 X240 Contract Value $12,225.00 Scope Microbial/Duct Cleaning Date of Completion 6/99 Client City of Pompano Beach Project Pompano Beach Public Safety Building Contact Mr. Brett Butler 954/786-4061 Contract Value $162,844.00 Scope Microbial/Duct Cleaning Date of Completion 7/99 Client Osceola County Administration Project Osceola County Jail Contact Mr. David Peach, Capital Projects Manager 407/932-5171 C Contract Value $50,882.00 Scope Microbial/Duct Cleaning Date of Completion 6/98 Page 2 Cross Construction Services, Inc. c Indoor Air Quality - continued Client Project Contact Polk County School Board Polk County Schools (Bartow High & Misc.) Ms. Del Delaneuville 941/519-4776 $7,250.00 - Bartow - Completed 9/98 $40,483.00 - Misc. - Completed 11/98 Microbial/Indoor Air Quailty Contract Value Scope Client United States Post Office Suncoast CIS & Sales Lois Avenue, Tampa, FL U.S.P.O., Fort Myers, FL Mr. Lenox Chew 813/354-6275 $5,500.00 Microbial/Duct Cleaning 2/98 Project Contact Contract Value Scope Date of Completion Client c Project Board of County Commissioners Martin County, FL Martin County Courthouse Stuart, FL Mr. Harold Markey, County Administrator 561/221-1486 $825,000.00 Microbial Remediation & Replacement of drywall to water damage throughout courthouse. Project was completed while courthouse was occupied. 3/97 Contact Contract Value Scope Date of Completion Client Project School Board of Lee County Caloosa Elementary & Middle School Cape Coral, FL Mr. Jack Snider, Jr. AMRC, Fort Myers, FL 941/936-8266 $235,000.00 Microbial Remediation & Deep Cleaning 6/97 Contact Contract Value Scope Date of Completion c Continued Page 3 Page 3 c Cross Construction Services, Inc. Indoor Air Quality - continued Client & Project Contact Contract Value Scope Date of Completion Client Project Contact . Contract Value Scope Date of Completion c Client Project Contact Contract Value Scope Date of Completion Client Project Contact Contract Value Scope Date of Completion c Sony Electronics Fort Myers, FL Ms. Patti North 941/768-7706 $31,358.18 IAQlDuct Cleaning 10/99 Hillsborough County Commissioners North Tampa Library Preferred Building Solutions Ms. Susan Wise 813/242-6522 $41,630.00 Microbial Remediation 10/99 School Board of Lee County San Carlos Elementary Fort Myers, FL Mr. Jack Snider III AMRC; Fort Myers, FL 941/936-8266 $16,945.00 Microbial RemediationlDeep Cleaning, Clean & Disinfect 8 Air Handler Units 2/01 School Board of Lee County Littleton Elementary North Fort Myers, FL Mr. Jack Snider III AMRC, Fort Myers, FL 941/936-8266 $6,340.00 Microbial RemediationlDeep Cleaning, Clean & Disinfect 6 Air Handler Units 2/01 Continued - Page 4 c Page 4 Cross Construction Services, Inc. Indoor Air Quality - continued Client Project Contact Contract Value Scope Date of Completion Client Project Contact c Contract Value Scope Date of Completion Client Project Contact Contract Value Scope Date of Completion Client Project Contact Contract Value Scope Date of Completion c School Board of Lee County Spring Creek Elementary Fort Myers, FL Mr. Jack Snider III AMRC, Fort Myers, FL 941/936-8266 $23,060.00 Microbial Remediation & Deep Cleaning 2/01 Lee County Board of County Commissioners Fort Myers Library Fort Myers, FL Daria Parry, Library Division 941/479-4632 $16,500.00 HEPA Vacuum & Aegis@Application 3/01 School Board of Lee County Edgewood Renaissance Academy Fort Myers, FL Mr. Jack Snider, III AMRC, Fort Myers, FL 941/936-8266 $13,275.00 Clean, disinfect & sanitize building #8/IAQ 3/01 Martin County Board of County Commissioners Jensen Beach Log Cabin Mr. Mike Sinkey 561/221-1486 $9,250.00 Deep clean walls, beams, rafters, ducts and HEPA vacuum all areas. 2/02 Continued - Page 5 c Page 5 Cross Construction Services, Inc. Indoor Air Quality - continued Client Project Contact Greenfield Environmental Bank of America - 4 Locations Mr. Kevin Kitch 727/896-1266 $18,000.00 Deep clean all areas; drywall, wallpaper, restrooms, etc., and apply biocide. 4/02 Contract Value Scope Date of Completion Client Project School Board of Lee County Adams Building - $4,250.00 LeHigh Elementary - $96,190.00 - (75,000 + SF) Dunbar High School - $24,500.00 Pinewood Elementary - $8,750.00 Mr. Joe Murphy 941/479-4250 Deep clean all areas; drywall, wallpaper, restrooms, classrooms, etc. AHUlDuct cleaning 2-02 - 9-02 Contact Scope c Date of Completion Client Project Contact AMRC Fort Myers News Press Mr. Jack Snider 941/936-8266 $23,057.00 HV AC cleaning/duct cleaning 8/02 Contract Value Scope Date of Completion Client Project Contact DPC General Contractors Registry Hotel- Naples, FL Mr. Fred Culleton 305/325-044 7 $400,000 + Drywall removal, deep cleaning of 18 floors, cleaning of AlC units 11/02 Contract Value Scope Date of Completion c Continued - Page 6 Page 6 Cross Construction Services, Inc. c Indoor Air Quality - continued Client Project Contact John B. Goodman L TD Partnership Sabal Palms Assisted Living Facility- Largo, FL Mr. David Bye, Director of Const. Maintenance 952/361-8080 $400,000 + Removal and replacement of microbial contaminated drywall. Cleaning of residence rooms. 9/02 Contract Value Scope Date of Completion: Client Project Contact Meyers & Associates/Coushatta Tribe of Louisiana Grand Casino - Kinder, LA Mr. Terry Bailey 337/738-7663 $1.5 Million Complete microbial remediation of two hotels and casino's, HV AC duct/unit cleaning, replacement of contaminated drywall and re-construction. Project started September 11, 2001 and completed in 2003 (worked in multiple mobilizations to accommodate season and guests). Contract Value Scope c Client Project Housing Trust International, Inc. The Preserve at San Luis, LLC Tallahassee, FL Mr. Richard Goldberg, CPM, CSM 954/791-1101 (Fax 954/791-9509) $700,000.00 Complete microbial remediation of 177 units in condominiums and 13 units in adjacent buildings. August 2005 Contact Contract Value Scope Completed: c c 1) Project: Scope: Contract Price: Contact: 2) Project: c Scope: Contract Price: Contact: 3) Project: Scope: Contract Price: Contact: 4) Project: Scope: Contract Price: Contact: c 25221 Wesley Chapel Blvd. Lutz, Florida 33559 Phone: (813) 907-1013' Fax: (813) 907-0297 LEAD ABATEMENT PROJECTS Sanford Memorial Stadium City of Sanford, FL Removal of lead based paint from structural steel & re-painting. (Asbestos removal req'd on project also). $184,750.00 - October 2000 - December 2000 Mr. Christopher O. Smith - City of Sanford Engineering & Planning Department 407/330-5674 u.s. Post Office Sf. Petersburg Processing Center 31 sf. Sf. & 1st Avenue N., Sf. Petersburg, FL Removal of lead based paint from concrete barriers. $12,235.00 - February, 1997 Irwin Contracting - Sf. Petersburg, FL 813/898-3333 - Mr. Roy Hanaman Florida Department of Transportation Dade City Train Depot Restoration, Dade City, FL Removal of lead based paint from windows and soffits. $58.000.00 - January 1997 R.M. Williams Contractors, Inc. - Tampa, FL 813/251-8051 Misc. Schools in Hiflsborough County Hillsborough County School Board Tampa, FL Removal of lead based paint on walls. Prepped walls for replacement painting $48,500.00 - 1992 (Franklin Jr. High) Mr. Lee Martin - Asbestos Coordinator, Hillsborough County Schools 813/744-8300 Continued - Page 2 Page 2 c 5) Project: Client: Scope: Contract Price: Contact: 6) Project: For: Scope: Contract Price: Contact: Cross Construction Services, Inc. Bayboro Power Plant Talquin Development Company-S1. Petersburg, FL Removal from structural steel "I" beams $139,787.50 Mr. Jeffrey Wolf, G.C. (Owner's Representative) S1. Petersburg, FL - 813/821-5871 Old Floridan Hotel H.C. Beck, Ltd., Tampa, FL Removal of lead chips/debris & misc. asbestos removal from hotel prior to renovation; October, 1998 $13,975,00 Mr. AT. "Skipper" Vaughn 813/926-2999 7) Project: House of Refuge, Stuart, FL Owner: Martin County Board of County Commissioners Owner's Representative: Timbergate Builders" Inc., Port St. Lucie, FL Scope: Removal of lead paint from exterior siding, colums, beams, soffits, facia, etc. - October, 1998 $24,000.00 Mr. Bob McCreary 561/468-6454 Contract Price: Contact: c 8) Project: Scope: Contract Price: Contact: 9) Project: For: Scope: Contract Price: Contact: 10) Project: For: Scope: Contract Price: Contact: c City of S1. Petersburg - Playground Equipment Removal and disposal of equipment from various city park locations containing lead based paint. $12,784.00 Mr. Lloyd Thomas 727/893-7022 - (P.O.#92334-6/98) Ronald McDonald House - Davis Island, FL J. W. Daniels Construction/Largo, FL Removal and disposal of 2,100 SF flaking lead paint. $9,750.00 Mr. John Yoder 727/546-5632 Terrace Hotel, Lakeland, FL Marcobay Construction, Lakeland, FL Removal & disposal of lead painted from wood doors, door jambs & windows on 1st and 2nd floors, $14,350.00 Mr. Howard Bayless, President 941/680-2293 o Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: c Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: c Page 2 25221 Wesley Chapel Blvd, Lutz, Florida 33559 Phone: (813) 907-10 13 . Fax: (813) 907-0297 Past Completed Projects Florida Department of Transportation District 1- Bartow, FL 3 Year Term Contract for Demolition Services 2007 - 2010 . Demolition of Structures (wet demolition as req'd) $200,000 per year approximate July 2010 ' Mr. Gregory Bohde 863/519-2434 Pinellas County Board of County Commissioners Various County Departments - Clearwater, FL Blanket P.O. #222699 for demolition and abatement services. Three year term contract. $170,000.00 October 2010 Ms. Joyce Gibbs 727/464-4344 Florida Department of Transportation - District 5 719 S. Woodland Blvd., MS4-501 Deland, FL 32720 Right-of-Way Acquisition Program for Brevard, Flagler, Lake, Marion, Orange, Osceola, Seminole, Sumter and V olusia Counties Asbestos Abatement/Demolition $500,000+ 3 year Term Contract - October 2010 Ms. Florence Fowler 386/943-5088 Continued - Page 2 Cross Construction Services, Inc. ~ c ~ Demolition for Private Corporations Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Hillsborough Community College Dale Mabry Campus, Tampa, FL W.T. Edwards Hospital Tampa, FL Demolition & Abatement of Five Story Building & 15 Out-parcels (Approximately 297,000 SF) $595,675.00 August 2007 (30 days ahead of schedule) Mr. Orie Voigtmann 813/714-9971 Professional Service Industries Tampa, FL Wares Creek, Bradenton, FL Asbestos Abatement & Structural Demo $162,000.00 March 2008 Mr. Keith Kartovicky 813/267-0087 Ballast Pointe Group St. Petersburg, FL Pinellas Commerce Center Largo, FL Asbestos Abatement & Structural Demolition $76,400.00. March 14, 2008 Mr. Dennis Gullo 727/577-8173 c Client: Project: Scope of Work: Contract Amount: % Complete: Completion Date: Contact: c Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Client: Project: Scope of Work: Contract Amount: % Complete: Completion Date: Contact: c Page 2 25221 Wesley Chapel Blvd. Lutz, Florida 33559 Phone; (813) 907-10 13 . Fax: (813) 907-0297 CCS Demolition/Clean-up Experience DeBartolo Development, LLC Georgetown Demolition Tampa, FL Structural Demolition & Asbestos Removal $551,700.00 100% March 2010 Mr. Monte Rosenberger 813/676-7677 Hillsborough Community College Dale Mabry Campus, Tampa, FL W.T. Edwards Hospital Tampa, FL Demolition of Five Story Building & 15 Out-parcels (Approximately 297,000 SF) & Asbestos Abatement $595,675.00 August 2007 (30 days ahead of schedule) Mr. Orie Voigtmann 813/714-9971 Skanska Gulfcoast Hospital Selective Demo Thru-out Hospital & Structural Demolition of Emergency Room Canopy & Misc. Stairwells 100% $517,805.00 June 2009 Mr. Bob Kramer 239/561-3607 Continued - Page 2 Cross Construction Services, Inc. Client: The Morganti Group C Project: Palm Lake Elementary School- $162,850.00 Metrowest Elementary - $199,000.00 Scope of Work: Structural Demolition Contract Amount: $361,850.00 % Complete: 100% Completion Date: August 2010 Contact: Mr. Andrew Kennelly 407/363-9821 Client: Pinellas County Board of County Commissioners Project: Various County Departments - Clearwater, FL Scope of Work: Blanket P.O. #222699 for demolition and abatement services. Three year term contract. Contract Amount: $170,000.00 Completion Date: October 2010 Contact: Ms. Joyce Gibbs 727/464-4344 Client: Florida Department of Transportation District 1 - Bartow, FL r' Project: 3 Year Term Contract for Demolition Services ~ 2010-2013 Scope of Work: Demolition of Structures (wet demolition as req'd) Contract Amount: $200,000 per year approximate Completion Date: Term Contract On-going Contact: Mr. Gregory Bohde 863/519-2434 Client: Florida Department of Transportation - District 5 719 S. Woodland Blvd., MS4-501 Deland, FL 32720 Project: Right-of-Way Acquisition Program for Brevard, Flagler, Lake, Marion, Orange, Osceola, Seminole, Sumter and Volusia Counties Scope of Work: Demolition and Asbestos Abatement Contract Amount: $500,000+ Completion Date: 3 year Term Contract Contact: Ms. Florence Fowler 386/943-5088 Continued - Page 3 C Page 3 Cross Construction Services, Inc. c r w c Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: Client: Project: Scope of Work: Contract Amount: Project Date: Contact: Client: Project: Scope of Work: Contract Amount: Completion Date: Contact: South Florida Water Management District West Palm Beach, FL Picayune Forest - Strand Demolition 140,000 acre wildlife preservation site in Collier County, Florida. Wildlife guidelines established and monitored by District for strict adherence to environmental concerns. Wet Demolition and Clean-up of Miscellaneous Parcels $1,461,000.00 May 2006 Mr. Octavio Castillo, P.E. 561/242-5520, )4035 Gulfpoint Construction Co., Inc. 8791 Conference Drive, Suite 1 Fort Myers, FL 33919 Heights Elementary 15200 Alexandria Court Fort Myers, FL 33903 Removal of asbestos containing floor tile & transite from 10 classrooms prior to complete demo of school by CCS $302,230.00 October 2007 - June 2008 Mr. John Huether 239/768-1800 First Florida Builders Miami, FL Winn Dixie Warehouse Tampa, FL Structural demo of 450,000 SF Warehouse $626,790.00 May 2005 Mr. Bob Miller 305/571-1970 c c c 25221 Wesley Chapel Blvd, Lutz, Florida 33559 Phone: (813) 907-1013 . Fax: (813) 907-0297 LIST OF SUPPLIERS Aramsco 101 Industrial Boulevard Winter Haven, FL 33881 1-800/767-1225 (863/965-7193 Fax) Mr, Dave Wolfe (813) 220-3817 Angelo's Aggregate Materials Ltd. 1755 20th Avenue, S. E. Largo, FL 33771 727/581-1544 (Customer #4160) -727/586-5676 (Fax) True Line Coring & Cutting Tampa, Inc. 6014 W. Waters Avenue Tampa, FL 33634 813/885-4401 - 813/885-4812 (Fax) Mr. Matt Alexander Twin-Chern, Inc. 5010 Hickory Hills Drive, Suite B Woodstock, GA 30188 800/442-4958 - 770/924-6147 (Fax) Mr. Chris Tracey The Tool-X-Change P.O. Box 149651 Orlando, FL 32814 407/267-3816 Bank Reference: Wachovia 14210 7'h Street Dade City, FL 33523 352/521-6245 - 352/521-6206 (Fax) Mr. Ardian Zika c 25221 Wesley Chapel Blvd, Lutz, Florida 33559 Phone: (813) 907-1013' Fax: (813) 907-0297 CCS EQUIPMENT AND TRUCK LISTING EXCAVATORS SEMI'S Kobelco 330 1 - Mack Komatsu 300 1 - Volvo New Holland 240 1 - Peterbuilt Komatsu 220 2 - Freightliners Volvo 210 Volvo 160 DUMP TRUCKS Volvo 140 Kenworth Case 135 Freightliner Kobelco 135 International Kobelco 25 Ford C LOADERS TRAILERS Komatsu 320 2 - 100 Yard Walking Floor John Deere 544 50 Yard Volvo L-60 40 Yard 30 Yard DOZER 55 Ton Transport Komatsu 04 45 Ton Transport 35 Ton Transport SKJD STEER 48' Flat Bed Bobcat 175 6 - Cargo Trailers Bobcat 130 3 - Utility Trailers Bobcat 873 4 - Portable Water Trailers Bobcat 262 Cat 262 ROLL-OFFS New Holland 160 6 - Mack 3 - Kenworth FORK LIFT 2 - Peterbilt JCB - 10,000# 2 - Volvo Toyota - 5,000# Toyota - 3,000# c All Equipment is Owned and Operated by CCS, c r' W c May 18, 2009 ..> J .! IBe ~~~at.tc-~~u0t~~. ttv RE: CROSS CONSTRUCTION SERVICES REFERENCE LETTER To Whom It May Concern: !Be Engineering-Environmental & Construction, LLC has had the above listed company perform se;vcJ:al dcmoli.li.uIl projects for our clients in the past. These projects have ranged from interior demolition and environmental abatement to the demolition of a five story former hospital building and all a."~oci<lted infrastructure. Cross Construction Services has perfom1cd this work in a workmanlike and professional manner. Should you have any questions or concerns regarding this letter, please do not hesitate to contact us at (813) 714-9971. Sincerely, IBe ENGINEERJNG-ENVIRONMENTAL & CONSTRUCTION, LLC odvf~- Oris L. V oigtmann, ;;J FLAC#AX67 8875 Hidden River Parkway, Suite 300 Tampa. Florida 33637 I -;( 813.975,7467. i 81,1.971 () lao "': www.ibccneinQQring.~om IJ WISCONSIN I FLORIDA OS/24/2007 12:43 8135719374 AQC INC PAGE 02 C air quality consulting, inc. May 24, 2007 Re: Letter of Reference Cross Construction Services 25221 State Road 54 West Lutz, Florida To Whom It May Concern: Air Quality Consulting, Inc. (AQC) is pleased to offer this letter of reference regarding Cross Construction Services, Inc. (CCS). We have worked in conjunction with CCS on dozens of projects throughout the State of Florida over the past six years, in the fields of asbestos and mold abatement of commercial buildings, schools and residential properties. c AQC's experience with CCS has shown them to be a competent contractor, doing excellent work at competitive prices. However, our most favorable description of CCS can be defined by their other practices. We have found them to be honest: a rare and desirable trait in any contractor. They have consistently filled their promises and obligations, without resorting to common and unethical practices such as filing change- orders unnecessarily or cutting corners. We have further found that CCS employees take pride, in . their work. and' occasionally will perform additional services. without. req uest or monetary compensation in an effort to keep their customers happy, We have found CCS to seek repeat business before current profitability, which AQC values and adopts as our most cherished business practice. Gladly and without hesitation, AQC is pleased to recommend Cross Construction Services to anyone seeking competent and professional abatement services. Sincerely, Air Quality Consulting, Inc. ~ Steven A. Lipson, CIH, CSP, FLAC Director of Technical Services c 1713 South KIngs Avenue, Brandon, FL 33511 www.airqualltyconsulting.com 813.571.9788 FAX 813,571.9374 c \ C c) DIAZ FRITZ ISABEL GENERAL CONTRACTORS January 5, 2007 Attn: Anthony Hanson Cross Construction Services P,O, Box 7106 Wesley Chapel, FL 33543 RE.. Mease Dunedin Hospital pi Floor Kilgore Dear Anthony: Often times in our business, the rush to finish the job at hand, obtain CO for the customer, complete the punch list, and get the next project underway doesn't allow the time to thank the people who went out of their way to make the project a success. When ajob is deemed successful, generally, the majority of the team members performed well. The integration, coordination and flexibility of trades to work together to achieve a timely goal is generally a collective effort, However, there are the exceptional members whose outstanding effort in the face of adversity and dedication to the achievement of work far in excess of industry standards deserves special recognition, These team members exceeded the goals that were defined for them on this project, despite the existing conditions. DIAZ FRITZ ISABEL is proud to present you with our "All Star Award". We truly appreciate your exceptional effort on this project and look forward to working with you in the future. I personally thank you for your efforts and I would recommend your firm to any and all that inquires. Very Trur~~~rs, ~;,:~~ Stephinie 6k~ V\, , Project Manager Diaz Fritz Isabel Enclosure PMJlls Tel: 813.254,0072 . Fax: 813,254.1822 . 13075-A Telecom Parkway N., Temple Terrace, FL 33637 www.diazfritz.com . CGC032980 c .c c C~EC CONTINENTAL REAL ESTATE COMPANIES Licensed Real Estate Broker November 11, 2004' Cross Construction Services Attn: Ray 25221 State Road 54 West Lutz, Florida 33559 RE: Invoice # CS2974 Dear Ray, I would first like to thank you for the quality service you provided to ContinentalPlaza. The remediation proc'ess conducted by your crew'and lead by Don Buck 'was performed ". . . in a most" professional manner and I would not hesitate to recommend your' services to others. . I am in receipt of your invoice and hav:e begun processingit so .that payment may be procured arid sent to you in atimelymanner. As 'you know, there was a,pm;tion ofthe work that was conducted in amailr:6om and adjoinipgstaffkitchen. This work needs to be billed to th~ Tenant by the Ul.Iidlord and as such I request that you forward to me a breakdown ofthe 40urs and cost/hourfor that portion <?fthewofk. This was discussed on site with Don and I believe in his notes he did sepanlte out the time for that portion ofthe job. I thank you in advance for your assistance. Best reg<ifds, . WBP Miaini Acquisitions, LLC .. Continental'.Rea1 Estate Companies, as agent for Owner :m~ . . v fence', ' Property Manager. 2665 South Bayshore Drive, Suite 1002 Miami, Florida 33133 Telephone: 305.854.7342 Fax: 305.858.6239 www.crec.com DOUG SMITH Commissioner, District 1 DENNIS H, ARMSTRONG Commissioner, District 2 LEE WEBER MAN Commissioner, District 3 ELMIRA R. GAINEY Commissioner, District 4 MICHAEL DITERLlZZI Commissioner, District 5 RUSS BLACKBURN County Administrator c TELEPHONE (;/1-288-5400 WEB ADDRESS http://www.martin.fl.us lVIARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 2401 S,E, MONTEREY ROAD. STUART, FL 34996 April 19, 2001 Dwight Hopkins Cross Construction Services P.O, Box 7005 30534 S.R 54 West Wesley Chapel, Florida 33543 Dear Dwight, Telephone: Fax: File: (561) 221-1329 (561) 221-1383 gsdOll.l07,aw I would like ,to let you know how pleased we have been with the service of your company. Recently Eric Fleming supervised the demolition of the Public Services Department area. within our Administrative Center. Our staff was completely impressed with the manner in which the work was performed. Because of Eric and his crew completing the job in such a timely and thor9ugh f<.1s.hi~p., the: o.v,erap project of reconstructing this area was done ?head.of. a 've:tytig-ht sch'edule, Your cO!llpany deserves many compliments for th~ir past service for Martin County but this particular job was exceptional. Thank you for your fine performance. MS/tlv 'C.!' ",Harold Markey, Manager ., . Russ Bl~ckbum, County Administrator c c C1 Hillsborough County School Board Carolyn Bricklemyer, Chairman Joe E. Newsome, Vice Chairman Glenn Barrington Sharon K. Danaher Carol W. Kurdell Candy Olson Doris Ross Reddick Superiniendent of Schools Earl J. Lennard, Ph.D, Deputy Superintendent for Instructional Support James P. Hamilton, Ph.D. Assistant Superintendent for . Human Resources . David G. Binnie, Ed. D. Direcior, Employee Benefits . Risk Management Gwen Wamsley, CPCU. Manager, District Safety Office Glen A. Lathers HlLLSBOROUGH COUNTY PUBLIC SCHOOLS ,I : District Safety Office February 16, 2000 Rusty Arney Cross Cohstruction 30534 S.R. 54 West Westly Chapel, Florida 33543, HE: HFQ NO. 3823-B Asbestos and Lead Based Paint Abatement .Dear Mr. Arney: !.,'.:'.'" "', , You are now.on the qualified contractor bidder list that will be used for asbestos and lead paint abatement work. Slere,y, ~~\ . - . l~~'" C/~ V / len A. Lqt ers Safety Mci ager v 4901 E. Dr. Martin Luther King Bo'ulevard, Tampa Florida 33605 Phone: 813-744-8300 Fax: 813-744-B981 Schoo! District Information: 813-272-4000 Web Siie: www.sdhc.k12.fLus !,.I~ ...... t11~t~ ~~:;}:::'; .\ '~".\ ~ . ~. . I .... i ':. c C' c / Clerk of the Circuit Court;..Martin County. Florzda P.O. BOX 9016 · STUART, FLORIDA 34995 . (4D7) 288-5718 MARSHA STILLER August 2, 1996 Dwight Hopkins Cross Construction Company 2855 SR 54 West Post Office 7016 Westley Chapel, Florida 33543 Dear Mr. Hopkins, I had the pleasure of working with Keith Davis and Jamie Dassatti during the cleanup of the Constitutional Office Building in Martin County, .Florida, Needless to say, r wasn't looking forward at all to cleaning moldy evidence vaults, In f act I really dreaded starting that job because the vaults were a mess with moldy contaminated evidence from trials oflong ago! ' r was greatly relieved at the end of the first day when r realized, because of how organized they were, a great deal of attention had been given as to how the job would b~ accomplished _ and the project wasn't going to be so overwhelming after all! They worked harmoniously and effectively: with others, displayed persistent attention to the job, and were very dependable and conscientious. As a matter of fact, we completed the job sooner than anficipated, r would like to compliment you on the high professional standards and the quality of work that Jamie and Keith performed. They are excellent ambassadors for Cross Construction Company and I thank you for sending such 'outstanding professionals to our job site. Sincerely, >r;A_..J~~<L- Marsha Stiller Clerk of Circuit Court Mserh C: Ray Reiger, Superyisor Keith Davis Jamie Dassatti ., , c DEI'^RTMENT OF MAN^GEMENT SERVICES 4050 EsplwAdc WAY' T:lib.h:ma:. Florich 32399-D950 TON CHILES. GOVERNOR WrUI^M H. I.1NDNER.. SECRET ^RY November 16, 1995 Mr. Dwight Hopkins, PresidenUCEO Cross Construction Company, Inc, 28555 State Road 54 West Wesley Chapel, Florida 33543 RE: Asbestos Abatement of the Florida Governor's Mansion Dear Mr_ Hopkins: ... I would like to thank you for the superb asbestos abatement work performed at the Florida lovemor's Mansion in Tallahassee recently. The quality of work and degree of care shown by your Oetsonnel and project manager was most impressive. Considering tile sensitive areas of the Mansion, historic preservation, valuable art work, and number of high level ,goverrunent meetings taking place, there was.viI:tmilly no disruption in daily activities. I have receiyed several comments from the Mansion Curator and other personnel stating what a courteous group: of workers from your firm were on-site. ' Our Division Director,- Bureau Chief, and myself very much appreciate the coordination and the valuable input from your project manager with our state project HV AC and electrical people to speed up this complex project in the Mansion_ Mr. Md Cason, Project"Manager and Mr. Mark Griffith, were instn.up.ental in making this project run as smooth and incident free as it did and they are both a credit to your firm, '. We look forward to working with you and Cross Construction Company, Inc. again in the future. w~ David M_ Wiggins Environmental Specialist Ci cc: File .:) ~cd r'pcr - I ! R M \N"ILLIAMS CONTRACTORS, INC. P.O. BOX 182B4, TAMPA, FLORIDA 33679-B284, (813) 251-8051, FAX (813) 251-1801 c April 8, 1994 RE: Cross Construction Company Gentlemen: Cross Construction Company has provided asbestos abatement services for us on numerous contracts including two at Tampa International Airport. c Their first subcontract at T.I.A. was for about $500,000 and involved removal of fireproofing in the bag make-up area. The work was done at night over a three month period. It was done in increments and performance times were critical to accommodate airline pairing during displacement, etc. Cross performed exactly as scheduled to the day. Their contract administration and dealings with the Industrial Hygienist were very professional and the entire project went like a training film. Their second subcontract at T.r.A. was for about $750,000 and involved removal of fireproofing above the occupied transfer level of the landside building. Again, their performance was exemplary. Cross Construction Company has subcontracted other abatement work from us up to $1,000,000 and they have always performed to the highest standards. We are comfortable recommending them for any abatement related work. V~1Y truly yours, !tlli/~~ R. M. Williams RMW:pgb c OFFICES LOCATED AT 504 S. MOODY AVENUE, TAMPA, FL c c c April 26, 1994 TO WHOM IT MAY CONCERN: Re: Cross Construction Co., Inc. 28555 Stale Rd 54 West. Wesley Chapel, FL 33543 Cross Construction has successfully completed the renova~ion of three (3) patient wards at the James A. Haley Veterans' Medical Center, Tampa. Florida. The scope of the projects included the abatement of asbestos in an active medical center. Throughout the 2-lI2 year process, the management and employees of Cross Construction displayed the type of professionalism that was reflected in the quali.tx <?f their workmanship. The management, administration, and first line supervisors always put forth the exLra effort to ensure the customer was satisfied. The entire operation. from the professional and timely submission of submittals to ~e expertise and experience of the projcct management. was always conducted in a very harmonious manner. Let this serve as a recommendation of the quality of workmanship and timely project management of Cross Construction. 4~". ~~;;r-~\ r-;.o/fh, ~~ ~'\;l'a~, 1; ,:,. "'{d:"; - r;' '\ \.,~ "I. Y JIIJ l i 1I ,. . l::<'~~ ........... 1 ~ ",?':i-:-":'" " '.\ \\~'?!H{5j~l/J G\'t~/ ~~ Jamc:s E. Mc:lv;n, Ed.D. Sl'p~rintendent THE SCHOOL BOARD OF LEE COUNTY 2055 Central Avenue Fort Myers, Florida 3390 I (813) 334-1102 January. 15, 1986 TO PHO/-f IT HAY CONCERN: Cross Construction Company was the successful bidder on OUr recent asbestos abatement project. We were very pleased with the perfor~ance of this firm during the entire process. I would strongly recommend this company 1.n the area of asbesto~ removal. c:; Sincerely, t] -fJ,uQ(2 f&,. I ,r ~~ld B. il/~ Assistant Superintendent Facilities & Transportation DBH/cas c IN PlJRSUIT OF EXCELLENCE AfIlrtnaflvc: Action u,u..1 On,...".",-o_"'_- r- Rayma C. Pab~ Chairman RolY.:rt L RaUiff, ill Vie.: Chaicman H'.)ward DeVore Mar)" M. Laurel Barbara Wallace Harry A. Blair, P.A. Attorney Q c c Klewin Construction. Inc. 1855 Palm Beach Lakes Blvd" Suite 903 West Palm Beach. FL 33401 (561) 6B3.54oo Fax (561) 683-5076 CGC 038422 May 21,2009 To Whom It May Concem: Re: Recommendation Letter for Cross Construction Services It is my pleasure to write this letter of reconunendation for Cross Construction Services, We have contracted this year with CCS for the building demolition of the Royal Palm School in Lantana, Florida for the School District of Palm Beach County. This demolition adjacent to the replacement occupied school facility required the utmost in cooperation and safety. Royal Palm School is like no other in that it is a special needs ESE facility housing Pre-K thru High School students. Cross Construction performed their work with excellent cooperation and attention to safety, We found Cross Construction Services personnel professional and efficient both in the office and the field. We found Cross Construction Services heavy equipment and trucks more than sufficient in number and in excellent condition. We would not hesitate to use CSS in the future and can easily recommend them to others. Any consideration for Cross Construction Services is appreciated. Feel free to contact me if you have any questions Very truly yours. Klewin Construction, Inc, /2QvJJ~' Peter N. Suutari Senior Project Manager. LEED AP Cell 561-644-3173 --- _...~ c c c Page 1 ot 1 2.!2P Johnson From: To: Cc: Sent: Subject: "Sniffen, James P - (ORL)" <jsniffen@tcco.com> <ccssjohnson@verizon.net> "Batia, Mark D - (ORL)" <mbatia@tcco.com> Friday, March 26, 201010:46 AM Beaches Oceanfront Resort Demo Skip, I wanted to take a minute to let you know how pleased I am with the job your team is doing down here in Daytona Beach. Any demo job is dangerous, this one is especially dangerous because of its height and close proximity to the hotels to the north and south. Hector Ramirez has put safety first while keeping production at a high level. His professionalism is second to none. ArnolfHerrero filled in seamlessly during Hectors time away from this project also putting safety first and making sure to consider the needs of the hotel's on either side. Juan Orosco has run his machine like an artist at play....many locals stand across the street for hours in amazement. He has taken the building down as strategically as it was put up. Your entire crew has worked efficient and safe and for that I would like to say thank you. As we continue to move closer to completion, please share my thoughts with the crew and remind them to keep up the great work! This is my second project (Las Palm as) with Cross in the last few months and my experienced was very much the same. I personally look forward to working with you and your team in the future and would recommend your company without hesitation. Thanks once again, Jim Sniffen Turner Construction Company 4/2/2010 c c c FROM (TUE)MAY 18 2009 14:35/ST. 14:35/No.7500000e07 P 1 ... '. " . .,. ,. . ..-:.::::.............;......:.:...;:;.:":.:::.: ':: .,:. ;.:.":': .:.:.:-:.'.:. :':'~...,' ,", - .', . .. : ";::":":\:::/<:~CHtJGAcn@ ;;::::::::::::::::::::;::::::It\::~::MM#W~l~:tlf.?:~ E R V ICE S ::::::::.:.,.... ..,.....:::;::::::::::::::~:i:~:j(.}~:}~:~::.::;:)~:::::::;:;;:;:::.:.:...... :::::(:}t::::{/:::::::::::::::::::::::ci:mt~:~~i~ Office P,O. Box 6349 Tampa, FL 33608-0349 Ph (813) 828-6679, Fax (813) 828.0457 May 19, 2009 To Whom It May ~6ncern: Reference: Cross Construction Services, Inc. . Multiple Building Demolition MacDill Air Force Base, FL The above referenced project is one of numerous successful projects that Cross Construetion Services has completed for our company. The management, supervisors, and creW always display professionalism and dedication to our projects to ensure a ti.mely completion. We are happy to provide our recommendation to Cross Construction for any of our demolition and environmental projects. Sincerely, .~j;~ April Brock, Contractor CMSI Contract Specialist Email: april.brock.ctr@macdill.af.mil '., . .' -. . . . ..... . 1..' . ....... . -. -. '. ". - . ". '. '.' ',",. _ . ~. . "_:~,::;,-:',~~."'.'~~.::~/~?!:"" . - - . . . - . '. .- . . .. . .'. . '. '.", . -.",. . . .' '. .:. ",',. " . .'.. '. :.: '. '," :' . -', " :.: ." \: ..,," =.'''' :.... '. ", " '. : . . " '". \. ': " :: ~ .:. ,; ~ ',' ::: ': : :'" \ '.:':~~~7.;.-.\~:~~~(~~. ~~('" ~',;~. t.:": ...~;. .:" f-f-~{~.~. 7:~:.~; ~-r ;~~~~:~:+~:' ": . ",:.'. '. . . : " '.' .' '. .'. -' .' . . ".: :'.'~.::-" ':.- _', . : . . . '. "'.- '. '. . '. .... ,- . '.. "'.: '. : i:: .~.,;,:\~:< .;<: ../:;>.\ . ':;~;!\::"" ";-'::;, t,:::.~.::,;::,.:.:.:~~.<, .~,,;,-;...:t?: . ~~~:: C'{:.:Ci':.':: .~::;:}? ,; ~,'o;;'/"..::? ":'?:.-::'"Z:~:X~':;::; '.' :.. '. : ;.' . c c C':. AKELDLOGANDSHAFER ARCHITECT / PLANNERS October 7,2008 Ms. Debbie Livingston Cross Construction Services, Inc. 6120 Highway 22 Panama City, Florida 32404 Reference: Selected Site and Building Demolition at Baker County Middle School Macclenny, Florida Dear Ms. Livingston: I am writing to express my appreciation for a job well done by your company on the referenced project. Cross Construction Services and Mr. Jimmy Livingston executed this project in a very timely and professional manner with no problems at all. This project had a very tight site and a very aggressive schedule and it was executed flawlessly. I would be very happy to recommend your firm to others and I hope to have the opportunity to work with you again. WHa/cmw . . .' . .. . . . .. ...... . . ~ . : . '. . . '. .: '.' ". . ..' '. , . '. .... . . " '. .. " . ... ", .... '; . . . '. . ":.' . ~ 1 .: . . . '. . ~ '. '.. '. ", .... .' . -. . . .. .' .. '. .... '. . . - . .... .... ...... ..... . . .... . -..,'.. ", :..', . ': :: "::.. . .:: '... .... '. '. . " . ,-.. .' . .", " --.: ....",", ',. :. " . . ".- . . . . .. '.. . . '. . . . .' .. '~ '. " . : '," ....... ....: ". -::', ..": ..", . . . ", .....: ..... .... .., ; - . '. . '.' . . . .. ." -... . '. . '. :', '" ":'" " ... . . ,-',' ".-.. ..:. . -' ..: ~. . :. . . '. . , '. ... .. .. . . -. :.: _:'.'::..~< :.::.~:;, :'.:~.':: -'::- ::: :\:.: '. :....:. -:: '. '. =::: ~. :~:.:~.' -:.. : -' :- .-....~. ~:.-: {:. '-:..-:: :...._....;:~.~;.~~:.:.<- : \....-=. ::':::.~ ; '. -- - ~ .' : -: ._:....~ - -. - - :.~ ::.;:.-.:;:;-:..-::.. .;.~'::"::"-; ~_..' -'. : " ".: ~.,"... .... ~. :'. ; - , -'-. '. "'..' . '- ~ . . . .... . . - :. ~ . - . .. .. ~. . ". ';: ,,:'- : ~.~ . . ., .'l04Ross('lleStreet,. jacksofl'Jl1t~.Flcrida3:?104" ,'.::' :__":'_::. ,: . " '.' :,:.,.-. .,.:, :.- ;'::..:. '.. '.:, ~'.~";:., '-:.'i. ';~'" " '.::,: . '..'- : Tel904.356.2654Fax904.356.~mlO '.' '.'.....: ' . , " .. . "'. . '. '''wylW.aJs;rrchi~~:c:o.:n" , . . '. .....: .. . . J'lACOO2!35 .:..... . . .. . . . c c c Ms. JESSIE L. BURKE 116 Ring Ave. North Tarpon Springs, FL 34689-4306 State of Florida DEP ARTMENT OF BUSINESS and PROFESSIONAL REGULATION 1940 North Monroe Street Tallahassee, Florida 32399-1027 RE: Cross Construction Services 25221 State Road 54 West Lutz, Florida 33559 September 18th, 2008 Dear Sirs: I'm old. In my lifetime I have encountered only one building contractor worth writing a letter of praise about. Most, in my opinion, range from dismal to genuine horror. This past year a building located in the downtown area of our Historical District had to be demolished. The site had become exceptionally dangerous, and there was question as to whether or not the shops on either side had walls-in-common. The roof had partially fallen-in, and some other architectural aspects of the building had collapsed. There was serious question as to whether or not this building could be taken down without death or serious injury. Cross Construction of Tampa got the job. It took awhile, but the only casualty of that demolition was one small water pipe connected to one of the adjoining shops. All Tarpon Springs held its collective breath while the work was going on. Everyone in town was concerned. Happy outcome: Cross had seemingly worked a miracle. Yesterday Cross began to demolish the house next door to mine, It had a huge sinkhole smack-dab in the middle of it. The geology in this neighborhood is definitely karst, and there are "anomalies". That lot next door is chockablock-full of "anomalies". Naturally, I was worried sick. I needn't have been, Cross kept everything confined to that lot alone, they watered the demolition so there was NO DUST, and they stressed the land as little as possible with the footprint oftheir heavy equipment. They filled-in the huge sinkhole. But the thing that impressed me the most was their replacement of the topsoil with beautiful, black, rich, loam. WOW! If the job is difficult, potentially dangerous, and/or involves historical structures that need extra measures of understanding and TLC, then Cross is likely the very best construction/demolition outfit in Florida. The way they work amazes me. The Florida Dept. of Business and Professional Regulation gets a constant stream of complaints from the general public, (usually soto-voce), when things aren't done c c c properly. Thought you would appreciate knowing when exceptional skills are exhibited and things are done to the nines (that's a tad rare). With every good wish I remain j:;;;l;;?~- JESSIE L. BURKE (Mrs, Leonard B. Burke) <; 25221 Wesley Chapel Blvd. Lutz, FL 33559 PH :(813)907-1013 FAX:(813)907-0297 RE: 16050 Collins Ave. Sunny Isles Beach, FL Receive go ahead for Pre-demolition asbestos survey (8-10 Days) File for demolition permit and file 10 EPA Notification (10 Days) Heavy demolition, loading & Disposal (10 Days) Final demolition permit, send over ajob completion report (1 Day) c RE: 16100 Collins Ave. Sunny Isles Beach, FL Receive go ahead for Pre-demolition asbestos survey (8-10 Days) File for demolition permit and file 10 EP A Notification (10 Days) Heavy demolition, loading & Disposal (12 Days) Final demolition permit, send over ajob completion report (1 Day) RE: 151 Sunny Isles Blvd. Sunny Isles Beach, FL Receive go ahead for Pre-demolition asbestos survey (8- 10 Days) File for demolition permit and file 10 EP A Notification (10 Days) Heavy demolition, loading & Disposal (18 Days) C Final demolition permit, send over ajob completion report (1 Day) c RE: 215 Sunny Isles Blvd. Sunny Isles Beach, FL Receive go ahead for Pre-demolition asbestos survey (8-10 Days) File for demolition permit and file 10 EPA Notification (10 Days) Heavy demolition, loading & Disposal ( 16 Days) Final demolition permit, send over ajob completion report (1 Day) ** Please note that if asbestos is found that additional time will be needed to remove the asbestos containing materials. There will not be any sub-contracts for this work, Cross Construction Services, Inc. is a licensed asbestos removal company. c... Zane Gilmore Project Manager Cross Construction Services c.;. DELIVER TO: City of Sunny Isles Beach City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 Request for Proposal SECTION 6 OPENING: 10:00 A.M. BID SUBMITTAL FORMS **BID OPENING DATE** PLEASE QUOTE PRICES F.O.B. DESTINATION, LESS TAXES, DELIVERED IN CI1Y OF SUNNY ISLES BEACH, FLORIDA NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local), Bid price should be less all taxes. Tax Exemption Certificate furnished upon request. Issued by: Purchasing Agent Date Issued: 07/08/2011 This Bid Submittal Consists of Pages 27 through 30 Sealed bids are subject to the Terms and Conditions of this Invitation to Bid and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. IFB 11-07-03 PROFESSIONAL DEMOLITION SERVICES FOR MULTIPLE CITY PROPERTIES A Bid Deposit in the amount of 5% of the total amount of the bid shall accompany all bids A Performance Bond in the amount of 100% of the total amount of the bid will be required upon execution of the contract by the successful bidder and City of Sunny Isles Beach Procurement Aaent: Marcanthony Tulloch Firm Name: Cross Construction Services, Inc. Commodity Code(s): RETURN ONE ORIGINAL AND TWO COPIES OF BID SUBMITTAL PAGES AND AFFIDAVITS FAILURE TO SIGN PAGE 27 OF SECTION 4 BID SUBMITTAL WILL RENDER YOUR BID NON- RESPONSIVE PAGE 27 OF 31 BID No. 11-07-03 SECTION 6 BID SUBMITTAL FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART lOR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID Addendum #1, Dated 7/20/11 Addendum #2, Dated 7/29/11 8/03/11 Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: D NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID , FIRM NAME: Cross Construction Services, Inc.___ AUTHORIZED SIGNATURE: _~ .. TITLE OF v' esident DA TE: 8/08/11 PAGE 28 OF 31 BID No. 11-07-03 A f J e-tJok( rI' -0\ 1 --- Mandatory Pre-Proposal Conference Summary Minutes Wednesday, July 20, 2011 at 2:30 p,m. City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RFP No, 11-07-03, Professional Demolition Services for Multiple City Properties Gio Batista, Public Works Director/City Engineer, welcomed everyone. Staff present: Assistant City Manager/Services Jorge Vera, City Clerk Jane A. Hines, Purchasing Agent Marc Tulloch, Assistant City Attorney Fernando Amuchastegui, City Manager Alan 1. Cohen, and Administrative Coordinator Luz Rey, City Clerk's Office. Public Works Director Gio Batista asked that everyone be sure to sign in as this is a mandatory meeting, The deadline for submission of Request for Proposals documents is Wednesday, August 10, 2011 at 10:00 a.m., at which time those sealed responses will be publicly opened. Any additional questions are required to be in writing and may be submitted up to five (5) days before the opening (at the close of business, Friday, August 5, 2011), which will be answered and posted on www.demandstar.com. You may email themtoCityClerkJaneA.Hinesatihines@sibfl.net. or fax them to 305-792-1563. Director Batista gave an overview of the project noting that this is for the demolition offive (5) City properties, and noted the aerial map that was included in the documents with the location of those properties. For the property at 350 Sunny Isles Boulevard we have a Lease Agreement with Miami- Dade County Water and Sewer (W ASD), It is a Treatment Facility/Pump Station with a holding tank and parking lot. The holding tank will be demolished and the entire lot, including the parking lot, will be leveled to the ground. W ASD is bound to provide the drawings. The Proposer shall meet with and provide W ASD with all necessary documents and tests that the agency requires for the demolition of the existing holding tank. This is more than a demolition project, and we will provide all information needed to accomplish the demolition. Whatever W ASD wants, we do, and whatever we do must be approved by W ASD. Director Batista opened the meeting to questions from the prospective bidders. QUESTIONS AND COMMENTS FROM PROSPECTIVE BIDDERS I. What is the extent of demolition, what point is existing lines? FOI' all properties it shall be as per the RFP. As to the W ASD property, demolition of property up to wet well as per W ASD and parking lot al'e to the west of the tank. Demolish tank to grade and remove all aspects of the pal'king and the tank as allowed by WASD. (See attached Lease Agreement for additional information on approvals) 2. What are your expectations, the entire holding tank, may be 15 feet below ground? Level the sudace, elevation 0, above ground to grade. Remove the tank entirely and replace with suitable fill up to gradc. Verify tank information with \V ASD to cnsure that thc entire scope is understood. 11-07-03 Pre-Submittal Conference Q/\ 072011.<1oc Page 1 of 6 3. What will this property be used for? It will be a City Park, and so no structures, . 4. As Built Plans for W ASD? As to the W ASD property, the City has no as-built plans. We will put the contact person for W ASD on DemandStar. Vendor will be responsible to pl'ovide all necessal")' documentation, including a scaled set of demolition plans with sufficient information to comply with all agencies having jurisdiction. Vendor shall include ALL elements of demolition and permitting for all necessary ,york. 5. All properties together? It is a five-part proposal on a per location basis. One part, and it is listed in the RFP, is going to begin sooner than the rest. Just note to use the dates that arc in the RFP as your approximate Notice to Proceed. 6. Are you going to award these separately? The presumption is that we will get a better deal if we do them all together. We will not be sepal'ating these in pieces, we will be awarding to one particular vendor. HO'\H~ver, the City may award separate contracts for each site. 7. Is the tank empty? Please ve!"ify with W ASD. 8. Was it a water tank? Not sure, please verify with W ASD. On the W ASD site, we need to be clear that the proposal should include the entire extent of what could be expected or anticipated in a similal' pl"Oject. 9. Will there be a check list of what WASD will require? No. If you don't have experience with W ASD, you will soon find out with WASD that it is a lot of back and forth. There is nothing in w!"iting in the form of a check list that would allow you to undel'stand exactly the extent of what they llre going to require. 10. Is there a contact person? We will provide a contact person for W ASD as an Addendum or Clarification on DemandStar. They arc aware of it, the extent is what you arc going to have to figure out in the proposal. 11. What are the other facilities? The other four facilities al'e pretty straight fonvard since they al'e City-owned propel'ties. Scope shall be per the RFP which includes demolition of all above ground structu I'es, trees, and others to grade. Properties shall be su rvcycd by the V cndor with necessal'y clcmcnts to obtain a pcrmit from all agcncies having jurisdiction. 12. Are you asking for an asbestos surveyor a boundary survey? Both. 11-07-03 Pre-Submittal Conference QA 072011.uoc Page 2 of 6 13. Why do you want a boundary survey? The boundary survey is not required. What is required is a topogl'aphic survey with a tree disposition plan included. 14. Are there trees on the properties? Yes. Field vel"ify and include in the surveys as per agencies having jurisdiction. 15. Are all the trees going? Yes. Include in proposal pCI' DERM I'cquil'cmcnts. DERM permit required. All the trees are going to the extent that it, in other words I will tell you how I did it on this other property and this is the flcxibility that we havc. DERM will say that wc have to Icavc the trce, I am going to leave it. If I have to replace a tree, thcn it is time and material for you all to get me replacement trees that I am going to put throughout the City. That is how we are going to have to deal with that, and so it is going to be, if, and you don't know right now what DERM's requirements are going to be for tree removal, so it will be time and material. 16. And you don't know what the extent of asbestos is? No. Vendor is to produce the necessary asbestos report with an abatement plan as necessary. Thc City does not know the extent of the asbestos on these buildings. That too is going to bc time and material when and in the evcnt that wc get to that point. There is no other way to try to figurc that onc into the cquation. 17. And so we need to get an asbestos survey? Y cs, figul'c on gctting an asbestos rcport with recommendations for evcry property in accordancc to State requirements. 18. That is part of your RFP? That is part of the RFP that the proposer is going to be submitting to me. In essence what I want to see is, I want to give you an NTP and when I get a call from you, all pennits arc done, the site is leveled to lime-rock or to grade. 19. What about pilings? Pilings will be time and materhtl because we don't know the extent of the pilings. 20. Right, but typical foundations and footings you want out but pilings and tier caps remain? Yes, just take it to grade. 21. Are you going to require a lead survey? Per DERM. I am going to require whatcver DERM rcquires. A lead sUI'vey, they didn't ask for it the last time I did this, they only asked for an asbestos survey. You do want to take into considcration that a couplc of our properties have dl'Y cleaners. Even though DERM does not have a pl'Oblem, there is no special issues related to dl")' cleanel's except when they I'emove their equipment, it has to be removed acconJing to their regulations. That is something that you al'e not going to be responsible for but in the event one of the dry cleaners leave a space with material that DERM does not look on f~"'ol'ably, that will be time and material as well. So the 11-07-03 Pre-Submittal Conference Q/\ 072011.uoc Page 3 of 6 presumption that you all are going to place in your proposal is that the tenant will be removing all their equipment in accordance to DERM regulations. So when you get there, the presumption is that all of th~lt has been taken care of. So that when DEI~I sees it, they are not going to' have a problem. There is on 151 Sunny Isles Boulevard, a dry cleaner and it is in full operation. . 22. Will you require a Performance Bond? Yes, Performance and Payment Bond. 23. A Bid Bond? No. 24. Will you elaborate on the situation with 151 and 215 Sunny Isles Boulevard and the possibility that Harbour Construction may be awarded those two pursuant to a previously entered legal agreement between the City and the Gold Club? Taking it a step further, presumably if they are the low bidder on those two, they are going to do them? They already have an agreement with you. The RFP states that the demolition of these two properties may be awarded to Harboul' Construction pursuant to a settlement agreement as described in the RFP. However, even if those two demolitions are given to Harbour Constt'uction, the successful hidder could still be awarded the remaining four buildings to be demolished. 25. What I am getting at is that it takes a lot of effort to put this together, if they are going to get it anyway, why bother? My job is to put out thel'e a Request for Proposal, and what it says here is a portion of the services c~m be provided for 151 and 215 Sunny Isles Boulevard to Harboul' Construction, and that YOIl all acknowledge that the City may award a portion of the services, and it says specifically ie. the demolition of 151 and 215 to Harbour Construction pursuant to an agreement. .26. So the worst case scenario the demo contractor breaks down the sites? We actually broke them down because there were different dates that the tenants have to be out, and that is why we put in the dates. 27. I have a question about the trees as well. First we assume that all the trees are to be removed, and put a boundary survey together and there is a possibility that a few may stay per DERM, but we are not to assume that DERM is going to say not to remove them? In your proposal, everything is getting removed, When DERM comes back and says that we need to replace in-kind trees, for examplc you have a ccrtain size, ",-hen you do a tl"CC disposition plan as part of the survey, they arc going to say thc size of the trunk and the spread ofthe canopy. DERM comes back and does a little rough number as to how many plants are required to replace that one tree, When DERM does that, that is a time and material to you all. So your proposal is going to take into consideration, trec removal. It is a little bit easier for you, I don't intend for you to know the equa tion by heart and try to figure out those things, so that will be time and material. 28. Are we allowed to visit the sites? Yes. they are opcn and availahle if you want to go by there. W ASD visit to he 11-07-03 Pre-Submittal Conference QA 072011.doc Page 4 of 6 coordinated. 29. Can you just go ahead and set up the day? Yes, ifthat is what you all want (all agreedj, okay so an Addendum will be prepared for a specific date fOl' the 350 property. I have to c1adty that you have to request all the permits. When it comes to the City permit, the City does requil'e that all properties be enclosed and that it has pollution protection on the fencing. So make sure you incorporate that. The only fee that is going to be waived is any fees that are from the City. Ifthel'e is a Miami-Dade County fee, which there typically is, I think it is 60 cents on ever $1 ,000, that is still required to be paid by the contractor. And so when you go pull a permit with the City there are still some charges that might be there. The only fees that we waive are our own City fees. The contractor will be required to pull all permits under his name, ~lIld to supply all the necessal)' documentation for that permit. 30. Are you talking about the construction fence, the temporary fence? All construction fencing shall have dust control. 31. The silt fence? The silt fence will be required if and when, in W ASD you have got the mangroves in the back, yes the silt fences are part of the NPDES requirements, which means that no pollutant can le~lVe the particular demolition site and go into the right-of-way, everything has to be controlled on site. Contractor is responsible for all permit I'equirements and conditions. 32. I believe that Sunny Isles Boulevard and all the surrounding streets are higher than the grade of the parking lot, and so it wouldn't make any sense to put a fence around it plus the cost for trenching through asphalt for fencing would be astronomical, it just doesn't make sense and he would ask that that requirement be waived? We can't waive the NPDES requirements, and so when you pull the permit and the NPDES issue does come up then it will be a requil'ement, if it doesn't, then it is not. I can tell you based on my knowledge that all the pollutants must be controlled on site. 33. In the event that there is asbestos in the building, tie it in with any cost for abatement? Whatever the asbestos report comes in and says abatement, will be time and material. All you will be including on YOUI" pl"ice is demolition as you regularly demolish, and the asbestos report. When the recommendation comes in from the asbestos company if they do find asbestos in it, then we have to develop a plan that is going to he amicable for all to remove it. Any abatement shall he hased on asbestos I"eport and shall he paid fOl' on a time and material basis upon review by the City. 34. Is the City going to cap the water and the sewer or is that our responsibility? No. This is the Contractol"s I'esponsibility. When you pull the permit with the City of Sunny Isles Beach, you will have to have the notices all clear from all 1'ECO, CNMB (City of North Miami Beach) fOl' the utilities, FPL and AT&T, and you are responsible fOI' that. 11-07-03 Pre-Submittal Conference QA 072011.doc Page 5 of 6 35. Does the City do their own water? No, it is the City of North Miami Beach. 36. And W ASD is sewer? Yes, WASD is sewer, CNMB is the water, and then you have AT&T and FPL (and other utilities) for the rest. And before you get a pel'mit you need to havc all the Lettcl's of "all clear" from those companies. 37. Are there fire hydrants for dust control? In some ofthcm you are going to havc an accessible firc hydl'ant, ill others you have to find the tire hydrants. You may have a problem 011 one of the properties, thc largc onc you will 1I0t, but on thcse two southern most properties 16050 and 16100 Collins Avenuc, you might not have a tire hydrant and may have to run a line somewhcrc. You will have to get a floating metcr from CNMB. Vcndor shall do a ficld visit and assess existing conditions. It is not your typical demolish kind of project, it is a little bit more but I think with that we have touched on the highlights of these projects. The two critical ones al'e the 350 Sunny Isles Boulevard with the WASD holding tank, and the 215 and 151 Sunny Islcs Boulevard of the acknowledgment within the proposal itsclf. But hc that as it may, YOll are welcome to propose on them and pleasc do. Thc attcndancc shects will bc on DcmandStar. The mandatory Pre-Submittal Conference was concluded at 3:00 p.m. J J-07-Cl.) Pre-Submittal Conference QA 072011.doc Page 6 of 6 Addendum NO.2 CITY OF SUNNY ISLES BEACH Demolition Services for Multiple City Properties CITY RFP NO. 11-07-03 To All Bidders: Bidders for the above-referenced project shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise. Miami-Dade County Water and Sewer Department will conduct an inspection of their site on August 10, 2011 at 10:00 a.m. Therefore, please be advised that the RFP opening date has been changed from August 10, 2011 at 10:00 a.m. to August 17, 2011 at 10:00 a.m. All interested firms must submit their RFP on or before, but no later than, Wednesday, August 17, 2011 at 10:00 a.m. END OF SECTION Friday, July 29, 2011 lvra.com roc To, Russell Amey (18139070297) ::. 17:0208/03/11 GMT -05 Pg 01-01 tA]Cenauml'\JCf"'3:l CITY OF SUNNY ISLES BEACH Demolition Services for Multiple City Properties CITY RFP NO. 11-07-03 To All Bidders: Bidders for the above-referenced project shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise. y Please be advised that the City has removed the property located at 350 Sunny Isles Boulevard from the RFP. Do not include this property in your submittal/proposal. END OF SECTION Wednesday, August 03, 2011 BID SUBMITTAL FORM Bid Title: PROFESSIONAL DEMOLmON SERVICES FOR MULTIPLE CITY PROPERTIES The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of Sunny Isles Beach to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. The Proposers accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Proposers, including without limitation those dealing with the disposition of Bid Security, This Bid will remain subject to acceptance for 90 days after the day of Bid opening, The Proposers agrees to sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within ten days after the date of the City's Notice of A ward. In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that: · The Proposer has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. · The Proposer has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. · The Proposer has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies which pertain to the subsurface or physical conditions at the site or otherwise may affect the cost, progress, performance, or furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, and no additional examinations, investigations, explorations, tests, reports or similar information or data are or will be required by Proposer for such purposes. · The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. · This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposers to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and/or Notice to Proceed. PAGE 29 OF 31 BID No. FIRM NAME: Cross Construction Services, Inc. Street Address: 25221 Wesley Chapel Blvd., Lutz, Florida 33559 Mailing Address (if different): Telephone No, 813-907-1013 Fax No. 813-907-0297 Email Address:ccctyler@verizon.net FEIN No. -.if!L -.2J ~I.J:I].J SU QJ~ * "By SIGNING THIS DOCUMENT THE BIDDER AGREES TO ALL TERMS TITLE: vice President THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. PAGE 30 OF 31 BID No. AFFIDAVITS PAGE 31 OF 31 BID NO. OF NON-COLLUSION AFFIDAVIT City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 STATE OF FLORIDA COUNTY OF Pasco The undersigned being first duly sworn as provided by law, deposes, and says: This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid, The undersigned is authorized to make this Affidavit on behalf of, Cross Construction Services, Inc.:.... Tyler Lillibridge (Name of Corporation. Partnership, Individual, etc.) a. Corporation (Type of Business) , formed under the laws of Florida (State) of which he is vice President (Sole Owner, Partner, President, etc,) Neither the undersigned nor any person, firm. or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned. have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid. or that such person, firm or corporation. shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 10.2, has directly or indirectly submitted said Bid or the contents thereof. or divulged information or data relative thereto, to any association or to any member or agent thereof. ~- Vice President ~ AFFIANT'S TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this 8th day of X August ,201l1 Personally Known or Produced Identification Type of identification TAMARA JAMES Commission # DO 985611 Expires August 24,2014 Bonded Thru Troy Fam Insurance 800-385-7019 i (Affix seal here) ,:,.<;ft);~ S .'i,::ts.:~1:,1~t.t;2.... ~:.~.. (Qa "~-% ~. ":...c'J.rf.~.~f ~ _,-t) ~.__.~.'~:- ~ '''~,[rf:~~~~'''" DECEMBER 28, 2010 1 pf 10 PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec, 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to City of Sunny Isles Beach Tyler Lillibridge - Vice President by [pnnt individual s name and title] for Cross Construction Services, rnC. lpnnt name ot entity submlttmg sworn statementj whose business address is: 25221 Wesley Chapel Blvd. Lutz, Florida 33559 and (if applicable) its Federal Employer Identification number (FEIN) is 59-3423008 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: N/A .) 11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1 )(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation, 11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1 )(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere. 11.4. I understand that an "affiliate" as defined in Para, 287.133(1 )(a), Florida Statutes, means: a,) predecessor or successor of a person convicted of a public entity crime; or b,) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime, The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair 2 of 10 DECEMBER 28,2010 market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate, 11.5. I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) x Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989, The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11,1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. By: d - (Title) (AFFIX NOTARY ..'w.... T NMRA JAMES f?:~t!'!.r~;< Commission # DD 985611 :*: :;: E:xpires August 24,2014 ~\ . ,;..~ . 800-385-7019 '.~,>,...". ,> n_....\ldThnlTroyF8Inln- 'IF. OF r:\'\ 0011\0 IIIlttl" 8th day of August , 20~, by . YQ/rnCUA ~ Signature: Notary PUblic{State of Florida -Il'Hn Il-(Ut- JPwn n Print or Type Commissioned Name Sworn to and subscribed before me this Personally Known x OR Produced Identification Type of Identification Produced 10/1998 3 of 10 EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY I AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief, Signed: Title: Ty Firm: Cross Construction Services, Inc. Address: 25221 Wesley Chapel Blvd. Lutz, FL 33559 DECEMBER 28, 2010 4 of 10 CONFLICT OF INTEREST City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes, Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTY OF Pasco BEFORE ME, the undersigned authority, personally appeared Tyler Lillibridge deposes, and states: 18.1. I am the Vice President Cross Construction Services, Tnc. with a local office in Lutz, .l<'1onda Lutz, l"londa 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No. 11-07-03 described as: Landscape Maintenance Services, The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. , who was duly sworn, of and principal office in 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 18.5 Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor anyone associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 18.7 I certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach, 18.8 I certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.91n the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach. ~aY_Of August ,mIlt 2011. /~: -? Tyler Lillibridge - Vice President - ~ Print or Type Name and Title ,~t'or~bscribed before me this 8th day of August , ~ 2011. 1; Personally Known OR o Produced Identification ; Type of Identification --1. NOTARY PUBLIC STATE OF FLORI \""\'~Il;'",, ~'e.~!"I:V:', :.: ( 'A t~: ,~~:f " "~l!::if:~~~"" TAMARA JAMES Commission # DO 985611 Expires August 24, 2014 ~_ The.. T my F3In Insurance 1lO().385-7019 DECEMBER 28, 2010 5 of 10 DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No". If you answer "Yes", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO x 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO x 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? X YES NO If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. Cross Construction Services, Inc. Firm 8/08/11 Date Tyler Lillibridge - Vice President Print or Type Name and Title DECEMBER 28, 2010 6 of 10 ANTI-KICKBACK City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 ANTI-KICKBACK AFFIDAVIT STATE OF FLORIDA ) ) COUNTY OF Pasco ) 1/ the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. By: Title: Ty [name of party on day of [name [type of authority], for behalf of whom instrument was 8th The foregoing instrument was acknowledged before me this August / 20~, by Tyler Lillibridge of person], as vice President Cross Construction Services, Inc. executed] . AFFIX NOTARY STAMP HERE: \"'~ S i" ""......t.,... TAMARAJAME H.:'fJ\t!'i..~ Commission # DO 985611 G ';~;... .~E Expli"es August 24,2014 Ii ,.'!.'-/;,. ^<;,,- ~"nedThruTroyFainl"'"""""~7019 /!, ..I{'J"'~~ '"N' Ii '''''''' .'-=-~ Tamara Janes Print or Type Commissioned Name Personally Known x OR Produced Identification Type of Identification Produced DECEMBER 28, 2010 7 of 10 ~ \oJ BID BOND City of Sunny Isles Beach 1e070 CotJin9 I\y/!~uo Sunny I~~ e"llcl;, Fl. 33; ED T~lep-~o::~l': (3O.S) 9,7..{160~ Fax (5051 H9.3'1~ STATE Or- FLORIDA COUN1Y OF ,~~ KNOW AU. MEN BY iHESI= PRFSENifl lt1l;1 >Ire, Cross Construction Services, Inc. _ as Principel. and Western Surety Company 101 S. Phillips Ave, Sioux Falls, SO 57104 , 2$ Surely; are held and firmly bound unlQ 11'>0 City of Bu"my lsl~" BII~C.h. II lllun1cipal C9rpordtiOt) of the Slllt!! of florida in the SUIi', of _ Five Percent of the Amount Bid Doll:lf~ ($_~_.J, l/lwflJl mon~,' of the United Statal;. fer l!':e payment ofwl"ch sum wen ancllruly to be mad~, we bind Quroolvet', our heirs, e~(!cuton:, G:lmlnrslf~tors "nd SlteteMors joinlly and StNef.'l!ly. firmly by these presen[~. THE CONDIT10N OF iH!S OBLIGATION IS SUCH that wlil!Jreas the PrincIpal has submitted tM accompar<yjniJ eid clatr;d, Auaust 10 2011 for. .!E6..l.hQ~t~~1 Oemolitiqn Services for Multiple City Properties WHEREAS, it was e oondhion precedent to the ~ubmi$~jon of said Bid 111a1 a ca9hier's CI'lecJI. or 5id Bon(/ in lhe llmount 01 flve perccrt (5%) 01 lhn 8ase 111i;l be sub.'nil1ed wilh saId afd 9S a gua-;mIMth:l\ II)!! Proposers \VC)Vld, il 3wllrdaj the COJ,tr8Cl. nnt~r Into tl v.,-!Ilrm Centrad wltl1 the City lor 1I1e p9roammce of said Contracl, wilhln WI (1 Q) c.onsecutive calendar day~ after vxitlen notice h2\1,r;g been given 01 role Award 01 the Contract. .. NOW, 'THEREFORE, the condhiolls of lhii' obligation ;:Ita s\Jch lh;!t 11 the PrincIpal ~Yilhln ten (Hl) cons9C1Jtive calendar days after \\rlllr.n notice of s',lch aceeplenco, er-lers inlQ n VlTitten Contrllct with the ClIy Of Sunny Isles Beech aM rurnishes the Performance Bond. satiSIa<:to'Y to the City, I!(lch In M amount equal1Q one hundred POl'rent (HiD>;') altlTe Contrllct Prl~; and ProYldes 11\1 required C~l'(iricate~ or In~lIrl1tlC~, IMn lhis obl'getim &1181100 void; a1h!'!rwise the slim hS'lJin slated shall be due and payable 10 the CIty of Sunny Isles Bead'l end lh~ Surely ht~l" agrees 10 pay Gtlitl sum irnmedial..:ly, upon l1emafllj of tl'>eCity, ill goot! <lI'lO lawf',ll mmey of the Un:tlld States of Am~riea. as liquidnte<l (tumages lor failure IhSI'P.of Of said Pnrcipal IN 'M1NESS WHI;P.EOf.=. tl'\eabove bonded parties hav~ exeC\f.eif Ihla lnsln.lmen\ vnder their s~verlll seals' tllis 28 day or July ,20.lL_. ih~ n<lmt! alld tht;! corporate seal of e~ch corpol"111e panybe1i19 heretn tlffiXed i)[Id I~~e, prC~l,'llt:l lJelo:.l duly signed by as undel"$igned represertstiva. bOCUMEN1 CONTINUES ON N~T PAGE iN PRE~NCE OF; ~O~';tructIO es, In (new, _. I E.> 25221 We ~s AdJier:;-~------ '-'Pjf)f Corpofate Seal Lutz, FL 33559-7201 City, SIal!!, and lip Coiie-..-....-- (813) 907 .1013 BU:"'r~~$ TeTQ';han~----- (813) 907.0297 3usir.ess Facsimle ~~ *":'~---~~~. ~ Jweph iN. '-oPre~ti, Adorney.in-Fact & Flonda Resident Agent Bond Department Staff B,nwn & S,own of FI;:>rida P.O. Box 15519 Tampa, FL 33659 (813) 226.1322 "Impra,:; C~1Jp()'allil S.~:1' II"'PORTANT SurelyCOlnp311leS e':ccuting b6n;f~ must apP<':ar on l~e nl}/lSury DeparJT11H'il's mOst CUrren! 1'51 (circular 570 a~ amel~jedl Md be au1hon<vo to fram\\c\ husinos" in the Stale of Flcrida_ O~8',",E~ 7.1), 2:)10 B \1f 10 . \. Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organized and existing corporation having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and seal herein affixed hereby make, constitute and appoint Joseph W. LoPresti, Steve Ayers, Anna Lee Duncan, Mary Jane Gwyn, Mia Bush, Individually of Tampa, FL, its true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf bonds, undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney, pursuant to the authority hereby given, are hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By-Law printed on the reverse hereof, duly adopted, as indicated, by the shareholders of the corporation, In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Senior Vice President and its corporate seal to be hereto affixed on this 30th day of July, 2008. 1o.,,,,,I\,~;lrr):'o\rl,... #'~~-"'-""""'('o'~ f$'~..'1oq,,/;,\"1:;.,; i:\(; Cfti:j \\\~l:A",/"'j "".~Oil'i:'h'_'.:i,O"'';.'' "'"~,,~,p.le,,,,"'" WESTERN SURETY COMPANY ~~";"V;"p''';drn' State of South Dakota County of Minnehaha } ss On this 30th day of July, 2008, before me personally came Paul T. Bruflat, to me known, who, being by me duly sworn, did depose and say: that he resides in the City of Sioux Falls, State of South Dakota; that he is the Senior Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporation. My commission expires November 30, 2012 +t.:.c.,c.,c.,c.,c.,c.,c.,c.,c.,c"l:o:Ic.,c.,c.,c.,c.,c.,c.,Co:lr.;.c.,c.,c., + ~ D. KRELL $ s s ~~NOTARY PUBLIC~~ s~SOUTH DAKOTA~s s s +c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,c.,+ ~ ~'y Pobl" CERTIFICATE I, L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in force, and further certity that the By-Law of the corporation printed on the reverse hereof is still in force, In testimony whereof 1 have hereunto subscribed my name and affixed the seal of the said corporation this 28 day of July, 201 I. ~~'\~'~;'E7""'''''' ~~"'~ ~............t ''0\ !I::'Y.- ~"Oq,,/;-",~,; \~~;;~~.:~{~} "'...."II~~I~I~""\,\," WESTERN SURETY COMPANY ~ ~-<Lqrt/ L. Nelson, Assistant Secretary Form F4280-09-06 " '4 ~ ' Authorizing By-Law ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY This Power of Attorney is made and executed pursuant to and by authority of the following By-Law duly adopted by the shareholders of the Company. Section 7, All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation, The signature of any such officer and the corporate seal may be printed by facsimile.