HomeMy WebLinkAboutURS
URS
July 15, 2011
-....
~
City of Sunny Isles Beach
18070 Collins Avenue, 4th Floor
Sunny Isles, FL 33160
Attention: City Clerk
RECEIVED
RE:
Request for Qualifications No. 11-07-01
Special Inspection Services, Including Geotechnical/Construction Administration
JUL 1 5 2011
l /),O~<'41"
CtIy of Sunny Isles Beach
ornes ot !he City Clerk
URS Corporation Southern (URS) is pleased to submit this proposal to provide Special Inspection
Services, including Geotechnical/Construction Administration as outlined in the above Request for
Request for Qualifications (RFQ) No. 11-07-01. This proposal is transmitted to the City in
compliance with the RFQ Proposal Specifications Package and all subsequent addenda. This
proposal was prepared without collusion with any other person or entity submitting a response
pursuant to this solicitation. URS staff has had no unauthorized contact with the City of Sunny
Isles personnel regarding this RFQ.
o
URS is a long-time established Florida corporation and we are the 2nd largest provider of Design
and Construction Engineering Inspection (CEI) / Administration services to the Florida Department
of Transportation on bridge and roadway construction projects throughout the state. In addition to
bridge/pier design and construction, URS has also been a Geotechnical Engineering leader in
Florida for over the past 35 years since the opening our South Florida office in Boca Raton, FL in
1975. This extensive design and construction experience provides URS staff with the pre-
requisite knowledge and experience in all phases of work including design reviews, permitting
support and CEI/Administration anticipated under this contract.
Our highly experienced and educated technical personnel have sound day-to-day working
experience and knowledge necessary to certify the project as being substantially complete in
accordance with permitted and contracted plans and specifications.
URS greatly appreciates this opportunity to submit this Request for Qualifications and we look
forward to the opportunity of working with the City on these challenging and important projects. If
you have any questions or require clarification to any of the information contained in this proposal,
please contact the undersigned at your earliest convenience.
Respectfully submitted,
URS Corporation Southern
~ ~/(j-
Jose Polo, PE
Project Manager
~r;i4L
Thomas F. Mullin, PE
Principal in Charge
o
3343 West Commercial Boulevard, Suite 100
Fort Lauderdale, Florida 33487
Tel: 954-739-1881
Fax: 954-739-1789
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
C SECTION 1.0
COMPANY INFORMATION
,....
~
c
1.1 URS COMPANY HISTORY
URS was founded in 1951 and incorporated in 1957 as Broadview Research - a research group active
in the areas of physical and engineering sciences. In 1967, management developed a growth strategy
focused on building a multidisciplinary professional services firm. In 1968, Broadview Research acquired
United Research Incorporated (URI) of Cambridge, Massachusetts. During this period, the name
Broadview Research Services was changed to United Research Services, which was later shortened to just
the initials URS. URS' corporate history of service dates back to 1904 through its legacy companies. URS'
financial stability is demonstrated by the fact that it is a publicly owned company listed on the New York and
Pacific Stock Exchanges as URS.
1.2 URS BACKGROUND
URS is a full-service, global organization with offices throughout the Americas, Asia-Pacific and Europe.
We have over 42,000 employees in a network of more than 300 offices and contract-specific job sites in 20
countries. Our broad-based engineering and construction expertise is a valued resource for federal, state
and local government agencies.
URS has developed long-term
relationships with many of our clients by
providing professional services that win
their long term trust and respect. Our
philosophy is simple: working together
to meet your goals, means winning
together. We take great pride in
developing design alternatives that are
creative, attractive and in harmony with
both environmental and program
objectives.
URS
U 5 orne. Loc.llon.
..
..
..1. ;
.>
I ~
. .. .. '\ .
'" ,. ~~
. :;' . .~..
'.,
':
..
, . I
'. ,
. .
"
1.3 URS BUSINESS STRUCTURE
URS Corporation Southern is a corporate entity that is organized into three divisions. The URS
Infrastructure Division provides planning, design and program and construction management
services. The Infrastructure Division also provides engineering and environmental services to
Fortune 500 companies worldwide. The URS Federal Services Division primarily serves U.S. federal
government clients and provides systems engineering and technical assistance for the Department of
Defense and Homeland Security. The URS Power Division provides engineering, construction, and
management solutions for infrastructure, power, mining, oil and gas, industrial/process and defense
projects. The Power Division specializes in design-build and design-build-operate-maintain services.
1-1 I P 2 g e
URS
c
/'"'
~
/""
~
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
1.4
URS FLORIDA LOCATIONS
Florida has been a major focus of the URS
Infrastructure Division professional practice since
1957. Today URS Corporation Southern maintains thirteen offices
in Florida, along with numerous field construction management offices.
These offices comprise over 1,000 people, consisting
of 129 management, 242 technical and 647 support
staff. We plan, design and manage the construction of
harbors, piers, bridges, boat ramps, marinas, shore
protective structures, parks, navigation aids, FDOT roadways,
bridges, educational facilities, government structures, water and wastewater infrastructure,
healthcare centers, power and renewable energy infrastructure, process and chemical
facilities, treatment and mitigation wetlands, etc. Due to our size, we can internally staff and
support each project from concept through construction with planning, design, engineering, field
data collection, community involvement and permitting expertise, and construction management as
required.
.. Major Office
... Satellite Office
. . -
Home Office 600 Montgomery Street, 26th Floor
San Francisco, CA 94111
Telephone (415) 398-1905
Local Office 3343 West Commercial Boulevard, Suite 100
Fort Lauderdale, FL 33309
Telephone (954) 739-1881
Internet Web Site www.urscorp.com
1.5 URS FLORIDA SERVICES
An advantage that the City of Sunny Isles Beach will have with engaging URS for their required
professional service needs, is that the City has access to the depth and breadth of the local and regional
expertise and resources of the southeast Florida URS staff and corporate network through the specialized
attention /focus of technical resources in our Fort Lauderdale, Miami, and Boca Raton offices. The City's
main point of contact will be through proposed project manager, Mr. Jose Polo who works from our Fort.
Lauderdale. The Fort Lauderdale office, along with the other South Florida technical centers in the Boca
Raton and Miami offices, have a current staffing level of approximately 200 employees offering expertise in
the following areas:
. Architecture and Landscape Architecture
. Bridge Design Engineering
. Civil/Site Engineering
. Coastal and Marine Engineering
. Environmental Engineering and Permitting
. GeorechnwalEngmeering
. Power Industry Services
. Project and Construction Management Services
. Solid and Hazardous Waste Management
1-2 I P age
URS
City of Sunny Isles Beach: Special Inspection Services
RFQNo.11-07-11
-
. Structural, Electrical, and Mechanical Engineering
. Surface Roadway Transportation
. Telecommunications
. Urban Planning
. Water and Wastewater Engineering
~
In addition to these technical and local staffing capabilities, URS has developed an administrative and
support organization to provide its project managers and professional staff with the financial and
administrative tools, support staffing, facilities, equipment and necessary support project operations to
provide complete and timely client services.
1.6 OUTSTANDING LITIGATION
URS is presently the second largest engineering design firm in the nation (ENR April, 2010) and had a
2010 revenue base of $9.18 Billion and a net income of $287.9 Million. Companies the size of URS will
have on-going various legal proceedings pending against the Company or its subsidiaries in connection
with the performance of our professional services. As such, as with any and all large nationally recognized
professional service organizations the size of URS Corporation, we all from time to time become the target
of sometimes legitimate as well as nefarious litigation actions. In response to and in defense of such
actions, URS maintains substantial liability insurance programs and policies to protect itself from any and
all litigation. Additionally, the Company has substantial assets, including liquid assets of several tens of
million dollars at any given time.
~
Due to the large size of the company and the tens of thousands of projects either in progress or under
construction at any given time, the company has a variable numbers of litigation actions ongoing nationally
and some worldwide at any given time. These actions are far too numerous to list and detail in response to
this RFP. Current litigation actions are estimated to be on the order of 1 litigation action for every $100
million of earned revenue. The Company's management does not believe that any of such proceedings
currently in progress will have a material or adverse effect on the consolidated financial position and
operations of the Company. URS Corporation Southern does, however, provide the following listing of
active cases in Florida:
~
Case Name Case No. Project Description Status
Walter Gaitan Florida State U RS Corporation Southern Plaintiff alleges a wrongful death claim Discovery
et al. v. URS Circuit Court, allegedly provided design services against U RS Corporation Southern, is
Corporation Miami-Dade to FOOT for the installation of a alleging that URS provided consulting ongoing.
Southern. et al. County, case cable barrier system along a services in relation to a cable barrier
no. 09-CA- portion of the Homestead system that allegedly failed and allegedly
29561 Extension of Florida's Turnpike caused the death of the decedents.
1.7 PROOF OF PROFESSIONAL LIABILITY INSURANCE
URS' proof of insurance is attached.
-
~
1-3 I P a g t-
URS
/'
'--"
r"'
'..,.
,........
'..,
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
1.8
IMPLEMENTATION OF SERVICES
The services required to perform this Construction Administration and Project Management Services,
Professional Consulting Services, Geotechnical Inspections, and other Special Inspection contract can
commence immediately after the City of Sunny Isles Beach signs a contract with URS or formally notifies
URS in writing of the City's intent to execute a contract with URS.
URS is committed to providing the experienced, trained staff needed for successful performance
and delivery of this contract for the City of Sunny Isles Beach. All City projects shall be managed and
administered out of our Fort Lauderdale office.
1-4 I i) :0 g e
URS
~
c
ACORD@ CERTIFICATE OF LIABILITY INSURANCE Page I DATE (MM/DDIYYYY)
~ 1 of 2 07/12/2011
t THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
... CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
" BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: Ifthe certificate holder is an ADDITIONAL INSURED, the policy(ies)must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER ~~N~ACT
Willis Insurance Services of California, Inc. :^~,?~~ em I:!:'t. .m 888-467-2378
26 Century Blvd. 877-945-7378
P. O. Box 305191 ~;:,~~12<:<: certificates@Willis,com
Nashville, TN 37230-5191
INSURER(S)AFFORDING COVERAGE NAIC#
INSURER A: National Union Fire Ins Co of Pittsburgh 19445-100
INSURED INSURER B: Zurich American Insurance Company 16535-100
URS Corporation Southern
7800 Congress Avenue, Suite 200 INSURER C: Illinois National Insurance Co. 23817-001
Boca Raton, FL 334B7 Insurance Company of the State of PA 19429-100
INSURER D:
INSURER E:
I INSURER F:
COVERAGES
CERTIFICATE NUMBER: 16274225
REVISION NUMBER:
~
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR TYPE OF INSURANCE ~~~; ~~,~ POLICY NUMBER POLICY EFF POLICY EXP LIMITS
IT"
A GENERAL LIABILITY Y GL4870829 5/1/2011 6/1/2012 EACH OCCURRENCE $ 4,000 000
- ~~~~~H9E~~~J~r~nce \
X COMMERCIAL GENERAL LIABILITY $ 1 000 000
I CLAIMS-MADEW OCCUR MED EXP (Anyone person) $ 10 000
lL XCU, BFPD PERSONAL & ADV INJURY $ 4 000 000
lL Contractual Liabi1itv GENERAL AGGREGATE $ 4 000 000
GEN'L AGGREG~L1MIT APn PER: I PRODUCTS - COMP/OP AGG $ 4 000 000
... ~. PRO-
POLICY X "~~T LOC $
~ AUTOMOBILE LIABILITY Y BAP938521502 5/1/2011 6/1/2012 COMBINED SINGLE LIMIT 2,000,000
- (Ea accident) $
X ANY AUTO BODILY INJURY(Per person) $
- ALL OWNED - SCHEDULED
AUTOS AUTOS BODILY INJURY(Per accident) $
- - NON.OWNED PROPERTY DAMAGE
HIRED AUTOS AUTOS (Per accident) $
- -
$
UMBRELLA L1AB H OCCUR EACH OCCURRENCE S
-
EXCESS L1AB CLAIMS-MADE AGGREGATE S
OED I IRETENTION $ $
C WORKERS COMPENSATION WC20635052 1/1/2011 1/1/2012 X TWCSTATU-, I IU~~-
AND EMPLOYERS' LIABILITY Y/N
A ANY PROPRIETOR/PARTNER/EXECUTIVE D N/A WC20635051 1/1/2011 1/1/2012 E.L. EACH ACCIDENT $ 2,000,000
OFFICER/MEMBER EXCLUDED?
C f~~~~~~~~ib"e ~~~er WC20635053 1/1/2011 1/1/2012 EL DISEASE - EA EMPLOYEE S 2,000,000
D DESCRIPTION OF OPERATIONS below WC20635054/WC20635055 1/1/2011 1/1/2012 E.L. DISEASE - POLICY LIMIT $ 2,000,000
DESCRIPTION OF OPERATIONS J LOCATIONS J VEHICLES (Attach Acord 101, Additonal Remarks Schedule, if more space is required)
Contract/Job Number: RFQ #11-07-01
The Workers' Compensation coverage shown above does not apply in monopolistic states. In the
States of ND, OH, WA and WY, Workers' Compensation coverage is provided by the State Fund. In
those States, the above-referenced policies provide Stop-Gap Employers' Liability only,
SEE ATTACHED
'-
CERTIFICATE HOLDER
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
~....
"""
AUTHORIZED REPRESENTATIVE
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
~~
ACORD 25 (2010/05)
Coll:3417511 Tpl:1300507 Cert:16274225 @1988-2010ACORD ORPORATION.AII rights reserved.
The ACORD name and logo are registered marks of ACORD
AGENCY CUSTOMER ID: 645175
LOC#:
~
C~D@
ADDITIONAL REMARKS SCHEDULE
Page--2- of ~
,
AGENCY NAMED INSURED
URS Corporation Southern
Willis Insurance Services of California, Inc, 7800 Congress Avenue, Suite 200
POLICY NUMBER Boca Raton, FL 33487
See First Page
CARRIER I NAIC CODE
See First Paqe EFFECTIVE DATE: See First Paoe
ADDITIONAL REMARKS
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM,
FORM NUMBER: 25 FORM TITLE: CERTIFICATE OF LIABILITY INSURANCE
Workers Compensation policies apply as indicated below:
WC20635051 - CA
WC20635052 - FL
WC20635053 - TX
WC20635054 - AK, AL, AZ, DC, DE, HI, lA, IL, IN, KS, LA, MD, ME, MI, MO, MS, MT, NC, NE, NH, NJ,
NM, OK, PA, RI, SC, SD, TN, VA, VT
WC20635055 - AR, CO, CT, GA, ID, KY, MA, MN, ND, NV, NY, OH, OR, UT, WA, WI, WV, WY
Jones Act Maritime Coverage provided under the Workers' Compensation policy,
City of Sunny Isles Beach is included as Additional Insured as respects the General Liability and
Auto Liability policies, where required by written contract,
,-~
'-"
,-....
'-(
ACORD 101 (2008/01)
Coll: 3417 511 Tpl: 1300507 Cert: 16274225 @200BACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
INSURER CANCELLATION TERMS
NAMED INSURED:
POLICY NO.
,-.
~
URS Corporation Southern
VARIOUS
Holder Name: City of Sunny Isles Beach
Cancellation Terms:
30 Days Notice of Cancellation will be provided by the carriers in accordance with the policy
terms and conditions in the event the policies are cancelled or non-renewed, for any reason other
than non-payment of premiums
Cancellation Terms Apply to the Following Coverages:
General Liability, Auto Liability and Workers' Compensation
,.......
W'
,,-....
~
"
~
c
r-
'--"
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
SECTION 2.0
QUALIFICATIONS
2.1 GENERAL QUALIFICATION & CAPABILITIES
URS is this nation's largest engineering design and environmental firms nationally and we are a
leading U.S. and local government designer and contractor. We execute a wide variety of projects ranging
from small local environmental assessments to large and complex engineering projects. The firm offers a
broad range of engineering, planning and architectural design, environmental studies and permitting
expertise as well as, program and construction management services for transportation, general building,
industrial processing and petrochemical, hazardous waste and water/wastewater projects. URS is involved in
every aspect of studying, rehabilitating, expanding and developing public infrastructure for communities of all
sizes - from small, rural towns and growing counties to major metropolitan cities.
Engineering News-Record (ENR) magazine annually ranks the top
engineering firms for design services.
For 8 of the past 10 consecutive years (2001-2009), ENR has ranked
URS as the nation's leading engineering design firm. In 2010 and
2011, URS was ranked as the second largest such firm.
Headquartered in San Francisco, URS is a publicly held company
listed on the New York Stock Exchange and the Pacific Exchange
under the stock symbol: URS
By providing a comprehensive range of services required to plan,
design, construct, operate and maintain infrastructure, URS helps
our clients improve the quality of life in their communities now -
and for the future.
URS is committed to providing all its resources such that the City
of Sunny Isles (City) remains a premier community well into the
future maintaining the spirit of the beautiful and bountiful terrain
that travelers first witnessed in the late 19th century.
.... , .-.
_r'_'-_
ENR i URS
Ranked Design
Industry's I Firm
Er9..tng...... A.c:ord f:ll' ~ ~ ~ (O"'lM('t...,.,. "-
~".V:"., Y' -
DESIGN FIRMS
Designers consolidate gains
but anticipate market slowdowns
URS' extensive experience with various government agencies stands the organization in good stead when
regional and local issues need to be addressed. URS' involvement in many large environmentally and
politically sensitive projects provides it with significant experience with coordinating and collecting public
stakeholder feedback and comments.
URS specializes in the planning, design, permitting, bidding, procurement, construction management,
and start-up of cost effective and environmentally sound architectural and engineering services to
public entities. Services provided at the local level include planning and preliminary engineering, detailed
211"~~-
- i-' r:; )-" \:-
URS
c
c
/"'"
~
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
design and contract documents preparation, regulatory assistance and permitting, bid support, equipment
procurement, and construction management, observation and related contract administration activities.
2.2 URS CORPORATE SERVICES
Clients gain the most when the professional design component of the project team is provided as an
integrated single source. With all technical disciplines within a single organization, responsibility is
established and flexibility to react to options is expanded. Our firm offers all professional design services from
a single source of project leadership and control. A general summary of our firm wide service capability is
alphabetically listed below. Highlighted in blue are the range of services anticipated to be required in support
of this RFP and anticipated projects.
. Architecture
. Biology, Ecology and Environmental Services
. Building Commissioning
. Certificate of Need Assistance
. Civil Engineering
. Coastal & Marine Engineering
. Cogeneration and Power Generation
. Communications Engineering
. Construction Management and Support Services
. Detailed Equipment and Systems Programming
. Electrical Engineering
. Emergency Response Planning
. Energy Engineering and Planning
. Environmental Engineering and Permitting
. Facility Assessment
· Facility Management - Planning, Operations and Maintenance
. Financial Feasibility Analysis
. Fire Protection and Life Safety Systems Design
. Functional and Space Programming
. Geotechnical Engineering
. Graphic Design
. Homeland Security Services
. Information Systems Consulting
. Interior Design
. Landscape Architecture
. Master Site and Facility Planning
. Mechanical Engineering
. Bridge and Roadway Design
. Traffic Analysis and Engineering
. Permitting Support and Expediting
· Post Construction - User Training, Post Occupancy Evaluation
2-2 I ;:: 3 g E:
URS
,-.....
~
c
r
'--"
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
. Program Management
. Public and Community Involvement
. Regulatory Planning Assistance
. Scheduling and Budgeting
. Site and Facility Evaluation
. Strategic Facility Planning
. Structural Engineering
. Threatened & Endangered Species Surveys and Consultation
. Transportation Engineering
. Visualization Techniques
. Water Resources
. Water and Wastewater Planning and Engineering
2.3 REQUIRED SERVICES QUALIFICATIONS OVERVIEW
URS has extensive, demonstrated Florida experience with the design of small to major bridge and pier
structures - both over local canals as well as in and over major coastal waterways. Our experiences include
the design of more traditional pile and pier-supported bridges, as well as the more complex and challenging
moveable bascule bridge structures. Inherent in the design of such structures is the demonstrated
understanding and ability to coordinate and communicate with project design team consultants and
their subconsultants in order to produce complete and accurate/buildable designs in a timely manner. Also
inherent is the civil, structural, geotechnical, MEP, life safety, fire, landscaping design and oversight of
surveying services and our proven ability to read, understand, and approve concrete design mixes for
structure in beach, island, and canal environments..
URS experience and expertise in this regard has resulted in the successful design and construction of some
of the most notable bridge projects in Florida including the Award winning SE 17th Street Causeway Bridge in
Fort Lauderdale and the SR 704 Royale Park Replacement Bridge in downtown West Palm Beach. URS was
also responsible for the design and CEI services for the new high level Thomas B. Manual Bridge over the St.
Lucie Canal on the Florida's Turnpike in St. Lucie County, Florida. The Thomas B. Manual project included
both a new high level pile supported bridge and demolition and replacement of the bridge deck on the pre-
existing bridge.
In addition, URS' Construction Engineering Inspection (CEI) Division has provided construction management
and CEI services for some of the most difficult and challenging projects to construct in the South Florida
region. Within the last 11 years, URS CEI staff have successfully completed the construction of such major bridge
structures as the SR 804 Ocean Avenue bridge in Boynton Beach, FL; the SR 704 Royale Park replacement bridge
in downtown West Palm Beach, Florida and most recently in 2010, the SR A1A Bridge of Lion Replacement Bridge
in downtown St. Augustine, Florida. All of these projects required the demolition of the existing bridge structure
and the re-routing of traffic flows in highly populated areas. To facilitate construction of the SR 704 Royale
Park and SR A 1 A Bridge of Lions projects, it was necessary to construct a pile supported temporary bridges
adjacent to the existing bridge to reroute traffic over the Intracoastal Waterway prior to the commencement of
demolition of the old bridge structures.
2 3 I ;-; ~ --
- - c ~ '::
URS
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
c
As standard protocol. which occurs at the completion of construction, URS certifies to FOOT that the projects
have been completed in substantial conformance with the plans and specifications.
In summary, through URS' successful design and construction CEI experience on some of the most notable
and challenging bridge projects in Florida, URS has demonstrated that our design and CEI staff have a
complete and full understanding of the acceptable methods of bridge design and construction
methodologies that need to be applied to design and successfully complete any given project. The
URS team detailed in this RFP is geared to provide the City with key personnel who have direct experience
on many of these challenging bridge projects and who will bring to the City a wealth of experience in
foundation and bridge construction. Additionally, proposed team members have extensive experience with
geotechnical conditions in the Sunny Isles Beach area as well as with the design and construction
considerations involved with deep foundation systems (i.e. driven piles, ACIP pies and drilled shafts).
2.4 REPRESENTATIVE CONSTRUCTION ADMINISTRATION AND PROJECT MANAGEMENT
SERVICES
URS has also grown to become one of Florida's top providers of construction program management
and construction engineering and design services. Over the years, we have developed an expertise in
federally and publicly funded projects, where we have worked with clients to successfully complete some of
the most significant projects in Florida's history. Our recent work program management work includes many
high-profile projects such as the SR 704 Bridge of Lions, Adrienne Arsht Center for the Performing Arts of
Miami-Dade County and the Palm Beach Convention Center in West Palm Beach.
c
It is anticipated that construction administration and project management services will include, but not be
limited, to the following:
. Precast yard - pre-stressed pile fabrication inspections
. Pile/Pier foundation load testing and installation inspection and documentation
. Pier deck construction inspection
. Restaurant Facility construction inspection
. Construction Material Sampling and Testing
. Special Inspector Inspections
. Underground utility installations and connections
. Pavement milling and resurfacing of roadways
. Roadway / Bridge abutment soil compaction inspection and testing
. Oversight management and review of Submittal and RFls and status of resolution
. Review and recommendations regarding any non-compliance notifications
. Change Order review and independent cost analysis and evaluations of proposed changes
. Review of Contractor's construction progress, schedule and critical path compliance
. Oversight of Contractor's performance regarding safety
. Review and recommendation to pay Contractor's application for payment
. On-site observations and reports on Contractor's construction progress
. Individual project budget and schedule review and monitoring
r
~
241[;-~-
- . d 6 'C
URS
c
c
/'
'--"
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
. Oversight of project substantial completion
. Oversight of project final completion, punchlisting and close out
URS recognizes that the nature of the projects are such that only part-time services on-site may be all that is
required of URS during the construction phase of the project. Inspections will be performed on a pre-
scheduled periodic basis and at critical hold points prior to concrete pours and/or other construction activities
which may render inspection of a particular component impossible to perform. Our PM will call upon
specialized engineering technical support members at any given time during the final design, construction bid
phase or oversight process to overview the analysis and technical recommendations provided by other
project design consultants.
URS is also known as a top tier provider of full services engineering, project management and construction
administration services for the South Florida Water Management District and we are currently providing
engineering design and construction management/engineering during construction services on several active
projects related to everglades restoration work in South Florida.
Successful construction projects don't just happen; they require a positive, forward thinking
proactive management team and a partnering mentality with all project participants. URS has the maturity
of staff and experience to establish a cooperative teamwork approach to any project. Formally or informally,
we will create a partnering atmosphere, encourage open discussion settlement of contract issues at the
lowest possible level, and seek the least cost on all monetary issues.
URS' construction services approach will be to take a proactive role in any assigned project. While
serving as the City's consultant during this project, the ultimate goal of our services will be to verify that the
project is constructed in conformity with the plans, specifications and contract provisions - on time
and - on budget.
The following list of CM Projects presented in this RFP are a compendium of selected examples of the bridge
and facilities construction projects - some with significant environmental permitting challenges - which
demonstrate the broad range of construction services URS is capable of providing to the City in
support of this RFP.
2-5 I ~3 g E
URS
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
C CM Proiect #1 - Sunnv Isles Bridqe Rehabilitation, North Miami Beach, FL
URS was retained by the Florida Department of Transportation to
provide mechanical and electrical specialty Construction
Engineering and Inspection services for the rehabilitation of the
Sunny Isles Bridge in North Miami Beach, Florida. The Sunny Isles
Bridge is a four leaf Hopkins trunnion bascule bridge utilizing floor
mounted machinery. The rehabilitation project included significant
mechanical and electrical work.
Mechanical work included: removal of the existing trunnion
bearings and field machining of the trunnions to_meet the
requirements for installation of spherical roller bearings; installation
of spherical roller bearings, pillow blocks and support pedestals; and complete replacement of the floor
mounted machinery. Replacement machinery included dual drive trains with electronic torque sharing
inherent to the drive setup. Each drive train consisted of a wound-rotor motor driving a planetary speed
reducers coupled to a rack pinion mating with a span mounted rack. Electrical work included: the
replacement of the main drive cabinet; replacement of the control console; replacement of the existing drum
controller and equipment with new SCR drives with new motors and brakes; and replacement of all
associated conduit and wiring. Lightning protection and intercom systems were newly installed on the bridge.
c
Services included extensive shop testing and inspections related to the motor and drive operation and to the
field machining of the trunnions. Work included a shop mock-up of the field machining conditions. Field
inspection addressed the installation of all new and replacement components and start-up and testing
functions for all operating and miscellaneous bridge equipment. Field inspection also included the inspection
of the jacking system and jacking procedure and bascule span balancing.
Owner: FOOT District VI
URS Role: Mechanical/Electrical Construction Engineering
and Inspection Services
Project Type: Trunnion Bascule Rehabilitation
Total Construction Value: $ 6.5 Million
Project Start: June 1999
Completion: March 2009
,.-..
~
2-6 I P .:; S e
URS
c
c
~
~
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
CM Proiect #2 - SR 704 BridCle of Lion Rehabilitation Proiect, St. AUClustine, FL
URS provided construction management CEI services for the $58 million rehabilitation and replacement of
the historic Bridge of Lions. The project is located in St. Augustine, Florida, which holds the title as the oldest
city in the U.S. The bridge, which has two lion statues placed at the west end, connects the heart of St.
Augustine to Anastasia Island over the Matanzas River. It has served the public since 1927 and is designated
as a National Historic Landmark. The original bridge was designed by Greiner Engineering, which became
part of URS in 1996.
URS Construction Services has managed the project for the five years of construction, which began in 2005.
The project entails the construction and removal of a temporary vertical lift span, partial demolition and
rehabilitation of the existing rolling-lift bascule span and approaches, new drainage, replacement of handrails,
light poles and light fixtures with elements similar to the
original elements from 1927, and landscaping, including a
new gateway park on east approach, to beautify the area
and return it to a historically correct configuration.
Owner: FOOT District II
URS Role: Construction program management
Construction Engineering and
Inspection
Project Type: Bridge Rehabilitation
Total Construction Value: $58 Million
Project Start: 2005
Completion: 2010
2-7 I P '" .~ E
URS
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
c
CM Proiect #3 - SR 704 Royale Park Replacement Bridqe, Town of Palm Beach. FL
c
URS provided Construction Management and complete Design Services for the Royal Park Bridge which
is a signature project for the Florida Department of Transportation. Located over the Intracoastal Waterway,
this twin-double leaf bascule bridge connects the City of West Palm Beach and the Town of Palm Beach.
The replacement of this bridge became an emergency project when, during a scour repair project, it was
discovered that Marine Borers had eaten through the wood piling supporting the bridge. The project has a
$50.8 million dollar construction cost and the construction contract was for 1100 days. The design team for
the project plans was led by URS/E.C. Driver and Associates (A subsidiary of URS Corporation).
In addition to the bascule bridge replacement and new bascule spans, this project included the design and
construction of a parallel, variable depth, arched, driven pile supported, cast-in-place segmental approach
spans that are just over 1,000 feet in length. Also included are; park improvements on both ends of the
bridge, a pedestrian bridge under the first segmental s an and several blocks of urban roadwa
reconstruction.
Owner: FDOT District IV
URS Corporation provided all bridge CEI services
during the construction phase of the project. Four
lanes of traffic were put on the bridge just before
Thanksgiving of 2004 and the project was completed in
February of 2006.
URS Role: Full SeNice Engineering Design
Construction CEI/Project Management
Project Type: Major Bridge Replacement
Total Construction Value: $50.8 Million
Project Start: 2005
Completion: 2007
c
2-8 I ,: ? 0~
u C ....
URS
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
C CM Proiect #5. Adrienne Arsht Center for the Performinq Arts of Miami-Dade County, Miami. FL
URS provided program management and construction administration services on the Adrienne Arsht
Center for the Performing Arts of Miami-Dade County project. The Arsht Center is a state-of-the-art complex
designed by the world-renowned architect Cesar Pelli, and is comprised of five buildings sited on 5.9 acres.
The two featured theatres are the 2,400-seat Sanford and Dolores Ziff Ballet Opera House and the 2,200-
seat Knight Concert Hall. A 200-seat black box Studio Theatre, the Peacock Education Center, and a
restored Art Deco Tower are united with the other two buildings by a Plaza for the Arts across Biscayne
Boulevard.
In the fall of 2003, approximately two years after
the start of construction and 30% completed,
URS was retained by Miami-Dade County to
assess and make recommendations on
restructuring the contractual and working
relationships of the various project participants.
The key project members had ceased
communications with each other, the project was
600 days behind schedule, and over $100
million in claims had been generated. The
County needed to effectively bring this high-
profile project back on track by regaining budget
and schedule controls. URS assisted the
County in restructuring, creating new contractual
relationships - most notably, changing the
agreement with the contractor from CM-at-risk to agency CM, re-baselining the project schedule, and revising
the project completion budget. This effort benefited all parties, avoiding a project stoppage, averting major
contractual disputes, and restoring public confidence in the investment of County funds. The project had no
litigation.
.:.
.' .
.,!.~
-~1:!'.
,..
'-t., ','
.~-:"~:.
" ',' . :-;. -
~~ .' '~,
~.. '., ..... M1': ," ~.~
' > - . ,.!ll';~,", I '.
"" ", · ~> .51?_. ~" ...
..,"~~~~~~~- :~'rl~~'~~'1 "'''',,''
'. "-'.., / /,-~ ,.~
~,.., ........~.
~ . ,'.. . - ~ ...-.... ;- . ---. - - .
.. ~\"
J
~'_.-:~.
~--..: . .. ~ . ..,.,::-.."",- "..
" ~-:;"
"~~ 0,
-~ .
.. ../~.....
c
, e Performi~g Arts
ht Center for th
Adrienne Ars
Major activities of the URS program management
team included:
. Change and schedule management
. Design analysis
. Monitoring of field activities
. Contract compliance
. Dispute resolution
. Close-out coordination
r'
'--"
""... :..~~
.. ~
. ;; ..".
Owner: Miami-Dade County
URS Role: Construction Program Management, Dispute
Resolution Services
Project Type: New performing arts center
Total Construction Value: $450 Million
Project Start: 2003
Completion: 2006
2-10 I p 2 g E
URS
City of Sunny Isles Beach: Special Inspection Services
RFONo.11-07-11
C CM/Design Proiect #6 - SFWMD Stormwater Treatment Area 2
The design and construction of ST A -6 Section 2 Flow-way 3 will help to provide significant improvement in
the ability to treat storm water flows from the 170,000 Acre C-139 Basin and the C-139 Basin Annex in
Hendry County, Florida. The proposed ST A-6 Section 2 Flow-way is located just North of constructed and
operational ST A-6 Flow-way Cells 3 and 5. ST A-6 Section 2 Flow-way provided for the additional
construction of 1 ,440 acres of new () .
impoundments in a 1.5 mile by 1.5 mile square
impoundment/treatment area.
As part of the design development process,
detailed Hydraulic Modeling and Geotechnical
Engineering of the proposed expansion was
completed in late 2005. Detailed Civil,
Structural, Mechanical and Electrical Designs i.
were completed in September, 2005 and the
project construction was completed in July
2007. Full time CM and testing services
were provided by URS staff during the 1.5
year construction duration.
.
r
'--"
c
Certificate of
Appreciation
t: ~.
...."'-
r"\
, ...
\.
rw.............~..
U"~""""OftIC.
""'--,...-- ....... ..... :I ,
,--'__At.-.s...-l ~
"-'-
J ~
I ~
"."
~.
{'oI '
\~~,
~ ........~
....................~..
s..-......._.......-........
.......--
~ ,
~ 11/1~l>5"
-,_....._-
.....--
-.--
__ LQD~ma~
~
i ......
-.. ...-......--
-. -
-----
..1,./s.os
i.O,.---
~c>>_
<J
Owner: South Florida Water Management
District
URS Role: - Full Service Engineering Design
- Construction Project Management
and Administration
Project Type: Water Ouality Treatment
Total Construction Value: $23.5 Million
Project Start: 2005
Completion: 2007
2 11 I co - ~ .-
- I C. E C
URS
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
C CM Proiect # 7 - Palm Beach County Convention Center, West Palm Beach, FL
The Palm Beach County Convention Center held its grand opening in January 2004. URS played a key role
'"" during the design and construction phases of this 350,000-SF
facility. Initial URS construction program management
responsibilities included master planning, budgeting, and
market research to help define the style of the structure and
fagade, allowing it to complement adjacent developments, as
well as establish the space requirements. The facility
contains 100,000 SF of exhibit space, a 25,000-SF ballroom,
and 23,000 SF of meeting room space.
c
,.........
~
Owner: Palm Beach County, FL
URS Role: Construction program
management
Project Type: New convention center
Total Construction Value: $80 Million
Project Start: 1998
Completion: 2003
URS' construction services staff helped define the method for
construction contracting, reviewed design development and
final construction documents, and assisted in the negotiation
of the final contract price. During construction, our team
monitored progress, facilitated schedule compliance, assisted
in resolving field challenges, managed the change process,
and had a lead role in the final completion, inspection and
turnover to the client of this fine facility.
2-12 I D :; g e
URS
c
c
~
~
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
2.5
REPRESENTATIVE PROFESSIONAL DESIGN AND CONSULTING SERVICES EXPERIENCE
URS is one of the largest FDOT roadway and bridge designers in the state of Florida as well as nationally
and have successfully designed and completed hundreds of major roadway and bridge projects
throughout the state of Florida. URS has roadway design and traffic engineering staff located in our Ft.
Lauderdale office and our Miami and Boca Raton offices maintains a large staff of roadway and
bridge/structural design personnel. Additionally, the Boca Raton office provides a full range of multi-
disciplinary engineering design capabilities including civil engineering, geotechnical engineering, structural
engineering, mechanical and electrical engineering, environmental engineering and permitting. The URS
Boca Raton office has been providing "Full Services" engineering design services to the SFWMD on major
Everglades Restoration projects for over the last 15 years.
The following Design Projects presented in this RFP are a compendium of selected examples of the bridge
design, facilities design and projects with significant environmental permitting challenges which demonstrate
the broad range of design and design coordination services URS is capable of providing to the City in
support of this RFP.
Desiqn Proiect #1 - Southeast 17th Street Causeway Bridqe Replacement, Ft. Lauderdale, Florida
URS, through our subsidiary EC Driver, designed a new twin double-leaf bascule bridge designated as the
"Gateway to Fort Lauderdale". The new bridge greatly alleviated congestion for both vehicular and boat
traffic and accomplished many of the Department of Transportation's goals. The design development
process involved extensive community involvement. Two design charettes were held to build consensus
among residents and local business owners. Their input affected the bridge shapes, colors, lighting and
amenities.
2-13 I P age
URS
r'
'--"
c
,-....
I
~
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
The old bridge had only twenty-two feet of vertical clearance over the waterway. The new bascule bridge
provides fifty-five feet of vertical clearance, reducing the number of openings to one every hour for
approximately five minutes. The twin structures are each fifty-four feet wide and are separated by a thirteen
foot wide open median. The bascule leaves span 210 feet between the centerlines of the trunnions. The
design of the bridge involved many significant innovative features. Perhaps the most significant innovation
was the development of the "carina" pier. This was the first use of a V-shaped pier on a bascule bridge and
provides less restricted views of the water and improves the overall proportions of the structure.
The bridge deck of the bascule leaves is an exodermic deck built with a composite steel grid system and a
concrete riding surface. This is only the second bridge in the country to use this system. The heavier weight
of the deck required a heavier counterweight. This was achieved by using a combination of heavyweight
concrete and steel ballast. For aesthetic reasons, the bascule leaves utilize steel box girders. This is the first
time that steel box girders have been used on a bascule bridge. The box girders and exodermic deck provide
lateral stability so the typical unsightly lateral bracing of the bascule leaves were eliminated.
The approach spans consist of trapezoidal precast segmental concrete boxes. The approach spans vary in
depth from eight feet at midspan to thirteen feet at the piers. This variation was incorporated to accentuate
the arched appearance of the approach spans. Extensive landscape and hardscape beneath the approach
spans provide large public areas.
Awards
~ NSBA/AISG 2003 Prize Bridge Award
~ AGEG 2004 Honor Award
~ FIGE 2004 Engineering Excellence Grand Award
Owner: FOOT District IV
URS Role: . Full Service Engineering Design
- Construction Project Management
and Administration
Project Type: Major Bridge Replacement
Construction Cost: $70,000,000
Design Cost: $4,000,000
Completion: 2001
2-14 I P 2 ? c
URS
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
c
Design Proiect #2 - SR 704 Rovale Park Replacement Bridge. Town of Palm Beach, FL
NOTE: This project was listed previously as a eM project experience.
c
URS provided full Design Services and Cons for the Royal Park Bridge is a signature project for the Florida
Department of Transportation. Located over the Intracoastal Waterway, this twin-double leaf bascule bridge
connects the City of West Palm Beach and the Town of Palm Beach. The replacement of this bridge became
an emergency project when, during a scour repair project, it was discovered that Marine Borers had eaten
through the wood piling supporting the bridge. The project has a $50.8 million dollar construction cost and
the construction contract was for 1100 days. The design team for the project plans was lead by URS/E.C.
Driver and Associates (A subsidiary of URS Corporation).
In addition to the bascule bridge replacement and new bascule spans, this project included the design and
construction of a parallel, variable depth, arched, driven pile supported, cast-in-place segmental approach
spans that are just over 1,000 feet in length. Also included are; park improvements on both ends of the
bridge, a pedestrian bridge under the first segmental span
and several blocks of urban roadway reconstruction. Owner: FOOT District IV
URS Role: Full Service Engineering Design
Construction GEl/Project Management
Project Type: Major Bridge Replacement
Total Construction Value: $50.8 Million
Project Start: 2005
Completion: 2007
URS Corporation provided all bridge CEI services
during the construction phase of the project. Four lanes
of traffic were put on the bridge just before Thanksgiving of
2004 and the project was completed in February of 2006.
c
2-15 I P ;:, E e
URS
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
C Desiqn Proiect #3 - Cape Sable Earthen Dam Replacements, EverQlades National Park, FL
URS Corporation was retained by the National Park Service (NPS) in
2006 to conduct an engineering analysis and feasibility study to
evaluate the best approach to repair and/or replace the East Cape
and Homestead Canal bulkhead dams in the Cape Sable
backcountry region of the Everglades National Park. The projects
are located in the remote wilderness backcountry of Everglades
National Park (ENP) in the very southwest corner of the State of
Florida.
The dams play a critical role in protecting the pristine remote t>* I
wilderness backcounty area of the Park and of Florida Bay. The 0
restoration efforts were of critical importance to ENP to arrest the
degradation of environmental habitat and species in the overall Cape Sable region. Due to the remote
location of the failed dams which are only accessible by small shallow draft boats or helicopter, logistics
played a keyed role in designing a feasible and cost effective solution.
URS was subsequently retained by NPS to complete an Environmental Assessment (EA), perform site
Geotechnical Assessments and prepare detailed final Engineering Design drawings and specifications for the
projects. The design efforts included the incorporation of a coastal wetland habitat restoration into the
design, obtaining Agency permits, preparing bid documents and overseeing construction operations as the
Owner's engineering representative. The project design was complicated by not only the remote site location
but also by the presence of very shallow shoals in the access routes leading to the dam sites through Florida
Bay and along canals leading to the dam sites. The shallow shoals were investigated and evaluated for
Bathymetry and Benthic resources as an early component of the design phase work.
,..
~
During the EA and throughout the permitting
process, URS worked closely with numerous
regulatory agencies (USACOE, FDEP, SFWMD,
NMF, FWC etc), to ensure all concerns were
appropriately identified and addressed early on
in the design and permitting process. Some of the
technical assessments performed by URS
included Mangrove and Wetland Evaluations and
Mitigation Assessments; preparation of an
Essential Fish Habitat Assessment, Contamination
study; Endangered Species Biological
Assessment; air and noise pollution assessments;
social and economic assessments; and comprehensive Benthic Surveys of offshore staging areas, evaluation
of alternative locations and installation methods that addressed stakeholder concerns.
c
2-16 I P " S e
URS
c
,.....
~
c
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
In addition, URS facilitated internal scoping meetings, public
scoping workshop and public meetings to communicate the
EA process and solicit input from the affected public. The
EA was subsequently finalized and a Finding of No
Significant Impact (FONSI) was issued for the project. The
project received ARRA funding in 2009 and is currently
being constructed - completion date scheduled for early
April, 2011.
Owner: Everglades National Park /
National Park Service
URS Role: Full Service Engineering Design
Construction Engineering Support
Project Type: Dam Replacements
Total Construction Value: $5.9 Million
Project Start: 10/2010
Completion: 04/2011
2-17 I r> ;:; ~ E
URS
c
,.......
~
""
.
~
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
Desiqn Proiect #4 - Solid Waste Authority. Capital Pro~ram Design/Construction Support,
Palm Beach County, FL
The Solid Waste Authority of Palm Beach County (SWA)
embarked on a $1.3-billion capital program to prepare for the J>
management of Palm Beach County's solid waste for the
next 50 years. URS has been engaged to assist SWA to
develop a program management plan and to serve as their
program design coordination and construction manager for
the capital program.
Major program components include significant private utility
replacements and upgrades at SWA's major complex on 45th
Street. The program's main elements are:
. To build-out of the current landfill site,
. Upgrade of the energy-from-waste plant,
. Program manage the design and construction of
new facilities including a new landfill site, a new
mass-burn facility, and new transfer stations.
Owner: Solid Waste Authority of Palm Beach County
URS Role: Program management of pump station
design, force main screening, facility design, sanitary
sewer overflow abatement plan, construction
management
Project Type: Pump stations, pipelines & reservoirs
Total Construction Value: $1.3 Billion
Project Start: 2007
Completion: Ongoing
URS goals for SWA are:
. Provide consistency in project management
. Provide independent oversight of projects
. Provide improved schedule performance, cost and quality control
. Facilitate improved communication and cooperation
. Provide proactive management of all projects
URS' first activity was to prepare an overall program budget and schedule assessment based on available
information and then to upgrade the quality of the input data and information to finalize an overall program
budget and schedule. Based on the final program URS prepared a cash flow forecast to help SWA evaluate
options to fund their program. URS assisted SWA to evaluate funding sources and finalize bond fund needs
and timeframes to fund the program projects.
Two of the first URS assignments demonstrate the breadth of our support to SWA. URS independently
evaluated pending claims and performed a schedule analysis for a critical transfer station project that was
already under construction and was behind schedule when URS was contracted. URS then assisted SWA
with termination strategies, procurement to engage a contractor to complete the work, and is supporting
mediation/litigation preparation. The second project required relocation of the Materials Recycling Facility to
allow expansion of the landfill. The timeframe was too short for a conventional design/bid/build approach.
URS assisted SWA in developing a design build qualification based selection procurement process for the
project. The project is currently under construction and is scheduled to be complete in time to allow critical
landfill cell expansion.
2-18 I co 3 g 2
URS
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
C 2.6 PROFESSIONAL PERMITTING PROCESSOR AND COORDINATION WITH AHJs
URS has a long history of providing environmental design and permitting services to clients throughout the
state of Florida. URS staff are highly experienced in providing PD&E studies for major FDOT highway and
bridge projects through some of the most environmentally sensitive wetlands and coastal areas in Florida.
Personnel from URS under the direction of Mr. Keith Stannard, have been providing FOOT ~istrict VI
with Oistrictwide Environmental Permitting Services for over 10 years since 2001. URS Environmental
Permitting staff are thoroughly knowledgeable and have strong working relationships with all Agency staff
involved in permitting and monitoring of permit compliance of projects of the nature required of this RFP.
URS has thorough working knowledge of federal, state and local regulatory requirements, having provided
permitting services on a wide variety of projects in South Florida as well as throughout the country. This
knowledge and successful permitting experience is demonstrated by successful completion of the projects
previously identified in the Additionally, we have participated and provided support to the response on
numerous enforcement activities where Consent Orders or Cease and Desist actions are being brought forth
by regulatory agencies. URS staff works with the client (and/or their attorneys) to assure that appropriate
negotiations are undertaken to ensure a favorable position
for our client's in resolving noncompliance issues for its
facility. Having participated in resolving numerous
enforcement actions, URS staff has the necessary
experience and technical expertise to assist our clients
throughout the regulatory process.
CURS has also furnished professional services to gain
approvals on a broad range of permitting issues associated
with implementation of recommended facility and
infrastructure improvements. Permitting activities include
construction, operation, and disposal permits with Regulatory Agencies such as the Florida Department of
Environmental Protection (FDEP) and US Army Corps of Engineers (USACE); Consumptive use and Right-
of-Way permits with the South Florida Water Management District (SFWMD); USACE Dredge and Fill
permits; and USEPA National Pollutant Discharge Elimination System (NPDES) permits. Our technical
abilities have been recognized by the Federal Government through the participation of staff in the
preparation of USEPA guidance documents. Other Florida state agency experience includes Florida
Department of Transportation, Department of Community Affairs, and the Fish & Wildlife Conservation
Commission.
Locally, URS is extremely familiar with the Florida Statutes (FS) and the Florida Administrative Code (FAG)
and routinely deals with governmental agencies in South Florida on a daily basis for all facets of development
reviews, approvals, and permitting, such as: dredge and fill permits, wetland resource permitting, storm water
permitting, (NPDES) permitting, etc. Regulatory coordination within Miami Dade County.
c
2-19 I I~' <0 ~, e
URS
c
c
c
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
On projects and assignments with the City of Sunny Isles Beach, the URS permitting specialist(s) will work
closely with City staff and other consultants in pre-application meetings and monitoring and responding to
regulatory permitting questions and comments with the intent of rapidly identifying and responding to
requests for additional information prior to formal comments being received on the application.
URS permitting support will implement the following:
. Develop and maintaining a project permit status listing/matrix to track the process and
follow-up activities
· Facilitate pre-submittal coordination meetings with the regulatory agencies
. Perform detailed reviews of the agencies' rules, regulations, codes, etc. to minimize
agency comments relative to new permitting efforts
· Review prepared drawings, sketches, support documentation for Quality and
correctness that is easily interpreted by the agency reviewers
· Coordinate, communicate and facilitate with the permitting consultant and agency
reviewers during the Agency review process on interpreting and understanding the
reviewer's questions and preliminary comments with the purpose of resolving or
answering the question before it becomes a formal RAI
. Facilitate and coordinate immediate response to the reviewer's comments and RAi's
. Review and facilitate clear and concise response documentation with the reviewers
comments and consultants responses noted
The permit specialist(s) will be responsible for scheduling and providing preliminary and initial permit
submittals to the regulatory agencies and for reviewing permit submittals with the URS and City Project
Manager and regulatory staff to clarify/review data/designs in the permits. The intent of the above permit
management process is to minimize the review time and unnecessary review and comment iteration periods
that unfortunately befall some difficult projects. If necessary, City council will be invited to attend regulatory
meetings in addition to URS and City personnel.
2.7 SPECIAL INSPECTIONS
The Project Manager (PM) will provide the daily single point of contact for the City regarding project CM and
Special Inspection support services. Our PM, Mr. Jose Polo is highly experienced on FOOT bridge projects
in providing the various inspections required for such structures and will bring his expertise and experience to
bear on the City's projects. Mr. Polo was the PM for the recently completed Bridge of Lion's replacement
project in St. Augustine, FL and was also the Lead resident CEI office engineer on the Royale Park
Replacement Bridge in downtown West Palm Beach completed in 2007.
Special Inspection Services. In accordance with the RFP, Special Inspections will be required to be
performed for the Dade County Building Department in accordance with the requirements of the Florida
Building Code. Special Inspections will be required in the following areas as applicable to the work in
progress at any given time.
2-20 I P ? @ 'C'
URS
c
c
r
......
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
NOTICE TO MIAMI-DADE COUNTY BUILDING DEPARTMENT
OF EMPLOYMENT AS SPECIAL INSPECTOR UNDER
THE FLORIDA BUILDING CODE
o SPECIAL INSPECTOR FOR PILING, FBC 1822.1.20 (R4404.6.1.20)
o SPECIAL INSPECTOR FOR TRUSSES >35' LONG OR 6' HIGH 2319.17.2.4.2
(R4409.6.17.2.4.2)
o SPECIAL INSPECTOR FOR REINFORCED MASONRY, FBC 2122.4 (R4407.5.4)
o SPECIAL INSPECTOR FOR STEEL CONNECTIONS, FBC 2218.2 (R4408.5.2)
o SPECIAL INSPECTOR FOR SOIL COMPACTION, FBC 1820.3.1 (R4404.4.3.1)
o SPECIAL INSPECTOR FOR PRECAST UNITS & ATTACHMENTS, FBC 1927.12
(R4405.9.12) (For tilt-up walls systems, inspect reinforcement as well)
o SPECIAL INSPECTOR FOR CURTAIN WALL FBC 2414.7 (R441O.5.7)
o SPECIAL INSPECTOR FOR STRUCTURAL GLAZING FBC 2415.7.2 (R4410.6.6.2)
o SPECIAL INSPECTOR FOR (Other items reQuested bv the Citv or Buildinl!. Code) *
*In addition, Special Inspections may be required by the various chapters for projects subject High
Velocity Hurricane Zonings.
URS inspection staff is well qualified to provide Special Inspections under the direction of a Florida
Registered Professional Engineer in those technical disciplines categories listed on the project organizational
chart.
Additionally, URS staff is experienced in providing traditional rebar inspections, pre-cast yard piling
inspections and concrete inspections as required by ACI-304. Of particular importance to the City's projects
will be the Special Inspector for Piling under FBC 1822.1.20. URS Geotechnical Manager Mr. Tom Mullin
is the foundation design Engineer of Record and has been providing Special Inspector for Pilings on
numerous high rises in the Sunny Isles Beach area. Projects under his experience and purview include
the 47- story LaPerla Tower right at the Newport Fishing Pier, the 25 to 40-story Pinnacle tower, the 50-story
Aqualina Tower, the 54-story Trump Palace and Trump Royale Towers and the Ocean I, II and III Towers as
well as other smaller towers in the Sunny Isles and North Miami Beach area. Mr. Mullin is highly
knowledgeable on the subsurface conditions to be encountered in the Sunny Isles Beach area.Q
2.8 GEOTECHNICAL ENGINEERING AND MATERIAL TESTING SERVICES AND QUALIFICATIONS
Geotechnical Desiqn and ACIP Pile Installation - URS has been providing Geotechnical Engineering
Services to the South Florida region for over 35 years since the opening of the URS office in Boca Raton, FL
in 1975. As indicated above, URS and Mr. Tom Mullin is the geotechnical Engineer of Record and has
provided Geotechnical design services for the majority of the newer high rise towers constructed in Sunny
Isles Beach along Collins Avenue since the late 1990s and have provided augered cast-in-place (ACIP) piling
installation inspection, documentation and certification of foundation capacity on thousands of ACIP piles
installed in the City.
Geotechnical evaluation and design services for these high rise projects have included axial and lateral pile
capacity evaluations, comprehensive settlement estimating, design of bulkheads and seawalls,
recommendations for surcharging of compressible deposits and dewatering disposal permitting and impact
2-21 I D '= g e
URS
c
c
c
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
mitigation for any near-by FDEP registered contamination sites.Additionally, since the late 1980s, URS has
been the geotechnical engineer of record for all of the Port Everglades, South port Container Yard (Phases I,
II and III) and initial wharf design and construction and subsequent container yard expansion projects
(South port Phases IV, V, VI, VII and VIII). Expansion projects IV, VI, VII and VIII all employed a rolling 10
foot high fill surcharge to consolidate compressible intra-coastal waterway peat deposits remnant from the
deforested mangrove preserves which once occupied the area. URS actually provided the full services
engineering design of container yard pavements and infrastructure for the 45-Acre South port V Container
yard expansion. This project was particularly unique and challenging as it was designed and constructed
within and over an old abandoned construction material debris landfill at the Port.
In addition to container yard geotechnical engineering services, in
2006 URS has supported Port Everglades by performing in-
water soil borings and rock coring for dredge deepening
evaluations of the Intracoastal Waterway, in the vicinity of the
South port Terminal and in what is termed the Weidener Shoal area
at the southwest corner of the Port Everglades inlet into the
Intracoastal Waterway. Soil borings for this work were performed by
Vertical V under URS supervision and are included in the current
USACE EIS for the Navigational Waterway dredging improvements
proposed for the South port Channel and inlet waterway into the Port.
~
~I.-~
~~~'l~ I!,
~~ ... \f,'1 ... ".
. ;-.- .;~_. '..,
....~!IiI' ~
, !
Additionally, in July of 2006, URS provided the City
of Hollywood with a Dredging Feasibility Study
for dredging of the Northlake area. This study
provided and evaluated Benthic Surveys,
Stormwater Outfall assessments, Bathymetry,
Geotechnical Evaluations including in-water
sediment sampling and rock coring, Seagrass
Assessments and looked at various Environmental
Impact analyses for various dredging options (i.e.
mechanical versus hydraulic) being considered for
the project. This study also evaluated various
dredging disposal options being considered for the
highly developed residential area surrounding the
lake.
Precast Prestressed Pilinq Installation - Piles for the fishing pier and bridge structures will likely require
driven precast, prestressed piling. Such piling normally requires Pile Driving Analyzer (PDA) testing to
evaluate vertical capacity and to provide installation pile driving criteria for the pile driving contractor. If such
PDA Testing services are not specified to be provided by the selected project Contractor, URS staff have the
PDA testing equipment and are presently providing such PDA testing services to FDOT bridge projects on a
regular basis.
2-22 I c' :: g ."
c
c
c
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
URS staff are highly experienced in performing and/or reviewing
the ancillary CAPWAP analysis of PDA data generated by the
PDA testing equipment. This PDA testing and CAPWAP analysis
and/or review work of same would be performed under the
direction of Mr. Micheal Sharp, PE as the technical Special
Inspector for such piling installation. Mr. Sharp is extensively
experienced in such work and presently provides such PDA
testing services on FDOT Districtwide PDA testing contracts based
out of the URS Tampa, FL office.
In addition to the PDA testing, it will be necessary to monitor the pile driving operations and to record the pile
driving resistance or blow counts per foot of driving during installation. URS staff have FDOT Pile Driving
Certifications necessary to provide these services.
Vibration and Settlement Monitorinq Services - During pile driving activities, it is common for URS to
provide Vibration Monitoring and Settlement monitoring surveys during piling installation activities primarily
when drive pilings are being installed. URS owns and operates four ( 4) vibration monitors as well as survey
level and rod equipment needed to provide such monitoring services.
Vibration monitoring criteria normally requires that vibrations imparted to adjacent structures not exceed a
vibration level greater than 0.5 inches/sec. Experience indicates that this vibration level is capable of being
felt by adjacent landowners and occupants thereof and may be sufficient to cause minor hairline cracking of
older more lightly reinforced structures - particularly where block construction was used in the building.
Depending on the location of the pile driving, distance to the adjacent structures and nature/age of the nearby
adjacent structures, lower vibration monitoring criteria may be appropriate to be specified to avoid or
minimized minor damage to adjacent buildings as well as to minimize complaint calls to the City.
Geotechnical Drillinq and Samplinq/Laboratorv Testinq Services - As previously indicated, URS has
been providing geotechnical design services to numerous high rise projects in the Sunny Isles Beach area for
over 15 years. During this period, URS has utilized the geotechnical drilling sampling and laboratory testing
services of Vertical V Southeast Inc. (i.e. formerly Bureau Veritas - North America Inc. - formerly Intercounty -
USL Laboratories Inc.) on the majority of high rise projects in the area.
Correspondingly, URS will continue to utilize Vertical V
Southeast Inc. drilling equipment and laboratory testing
services based out of their North Miami Beach Facility near
Interstate 95 and the Golden Gate Interchange.
Additionally Vertical V will provide field inspectors staff for
sampling and testing of construction materials on an as.
needed call out basis
......".,
. ~a"
2-23 I P :0 E Co
URS
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
c
Vertical V Southeast Inc. is a full service laboratory capable of conducting all of the field and laboratory
testing of construction materials required of this RFP and
anticipated of this project which may include concrete, grout
soils, aggregate, asphalt and other testing as may be
requested by the City and URS staff during the progression of
the work.
Vertical V-Southeast, Inc. (Vertical V) is an local South Florida
industry leader in technical services and solutions in the field of
construction materials testing and inspections, and engineering
consulting. Vertical V acquired the Materials Testing and
Inspections Division from Bureau Veritas North America, Inc. in March 2010, and also formerly Intercounty-
USL Laboratories, Inc. to strengthen its technical and professional resources in Materials Testing Quality
Assurance services.
Vertical V's President Alexander A. Hockman, P .E., has managed the South Florida operations since 1985.
Other key personnel include Vice Presidents Mr. Alfredo Budik, P.E. and Mr. Lino Medina (each with
extensive experience in Miami-Dade County). Vertical V employs engineers, scientists, technicians and
support staff to provide quality engineering services in municipal, transportation, civil infrastructure, utilities,
waterfront, airports, municipalities and private industry.
. With eight drill rigs and an extensive inventory of conventional and specialized drilling
and sampling equipment, Vertical V is able to complete exploration programs on land, over
water, in areas with difficult terrain or locations with restricted access. In conjunction with our
subsurface exploration capabilities, IL also offers environmental engineering services related to
groundwater and contamination assessment and testing.
c
Vertical V has offices in Hollywood and North Miami Beach, including a laboratory facility
accredited by the Florida Department of
Transportation (FDOT), Construction Materials
Engineering Council (CMEC), Miami-Dade County
and the U.S. Army Corps of Engineers (U.S. Army
Corps of Engineers).
.
~I ~J ~ '"-~'J:.-I
II l;'l,i_~~, - '!
~ ..100:. - ~ Q,: ~'- ...... '~i
..
____ ----...II
Vertical V field staff and in-house laboratory
facilities provide materials testing and quality
control assessments of concrete, grout, concrete
block and soils. IL can also provide for structural
steel observation and testing and masonry testing.
VV is able to perform on site testing of soils
including quality control documentation for field compaction density testing.
.
c
2-24 I p 2 g E:
URS
,-.
~
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
SECTION 3.0
STAFFING
URS is committed to providing the City of Sunny Isles Beach with experienced engineering, technical
professionals and construction management staff needed to successfully achieve City's objectives of these
Scopes of Work. Project management personnel will be dedicated to each assigned project as necessary to
support the work. Technical leads, key technical staff and subconsultants, administrative and support
personnel will be scheduled following the requirements of each individual project assignment and to obtain
detailed personnel loading requirements for each project and any subtask assignment.
URS will be supported in our work by personnel from Vertical V Southeast Inc. Vertical V (i.e. formerly
Intercounty Laboratories - USL Inc, formerly Bureau Veritas North America Inc.) is a long time South Florida
engineering and materials testing company. URS has worked extensively with Vertical V personnel on
numerous projects throughout the South Florida region and in the City of Sunny Isles Beach.
URS will also be supported by LH Engineering, Inc. LH Engineering is a professional engineering
consulting firm specializing in the design of commercial and residential heating, ventilation and air conditioning
systems, electrical power distribution, illumination and sanitary systems as well as providing specialized
technical consulting, which has included airfield lighting, hydrant fueling, SCADA & PLC communication and
direct digital controls. URS has worked extensively with LH Engineering on numerous projects throughout the
South Florida region.
,....
~ A project organization chart proposed for this project is included on the following page.
,.-
~
3.1 URS STAFFING CAPABILITIES
URS has approximately 1000 staff based in Florida located in offices throughout the State and more
than 42,500 personnel in over 300 offices in major principal cities throughout the United States and abroad.
Presented below is a summary table showing number of employees organized by discipline both on a firm
wide and State of Florida basis:
Discipline
c. No. of Employees
(1) FIRM (2) Florida
2,653 22
346 13
215 3
1,070 28
250 1
1,512 81
268 11
595 33
446 22
253 8
Administrative
Architect
Biologist
CADD Technician
Chemical Engineer
Civil Engineer
Computer Programmer
Construction Inspector
Construction Manager
Cost Engineer/Estimator
3-1 I P ,:; g co
URS
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
,...... c. No. of Employees
'--" Discipline
(1) FIRM (2) Florida
Ecologist 49 2
Electrical Engineer 1 ,496 12
Environmental Engineer 940 17
Environmental Scientist 1 ,303 31
Fire Protection Engineer 80 2
Foundation/Geotechnical Engineer 292 8
GIS Specialist 226 11
Geologist 722 14
Hydrologist 75 1
Industrial Hygienist 61 2
Land Surveyor 105 10
Landscape Architect 44 7
Mechanical Engineer 1 ,007 12
Ocean Engineer 206 2
Planner: Urban Regional 244 4
Project Manager 2,358 81
Safety/Occupational Health Engineer 339 1
C Scheduler 164 1
Security Specialist 196 5
Structural Engineer 837 46
T echnician/ Analyst 1,418 50
Transportation Engineer 425 23
Water Resources Engineer 288 16
Other Engrs/Planners/Scientist 5,853 44
Hydrogeologist/Geohydrologist 166 2
Accountant/Financial Expert 1 ,434 8
Contract Administrator 278 2
Hazardous Waste Mgr./Specialist 785 6
QA/QC Specialist 922 4
Human Resource Specialist 368 1
Logistics & Configuration management 609 1
Project Control Specialist 641 2
Public Involvement Specialist 171 1
Other Employees 10,819 370
Total 42,529 1021
,...
~
3-2 I p 3 g e URS
c
c
c
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
3.2 STAFFING CONTROL
URS will dedicate the appropriate level of staff to complete delegated assignments and any special or unique
skills required to achieve City's objectives associated with executing the work. URS has a large number of
projects under way at any given time which are too numerous to list in this RFP. Through the Personnel
Resource Allocation Process to be described below, URS has the ability and capacity to shift personnel
staffing resources between projects and local offices to achieve required deliverables and their schedules.
URS management of professional staff is "disciplined based". To accommodate normal fluctuating workloads
and assure proper staffing of all URS projects, the firm follows a four-step resource allocation process:
Personnel Resource Allocation Process:
Step 1: Forecasting - communicates expected project staffing requirements for current and
anticipated projects or task order assignments.
Step 2: Assessment - matches the qualifications and numbers of personnel identified In the
forecasting step with our local and/or database of technical and support personnel resources.
Step 3: Take Action - The Project Manager and Principal in Charge ensures adequate numbers of
qualified, trained personnel are available and assigned to the work. The Project manager and
Principle-In-Charge will work with other state and national office managers to provide necessary
personnel when local or subcontractor staff availability are insufficient to handle projected staffing
levels.
Step 4: Update Forecasting - The Forecasts, Assessment, and Action Steps are repeated routinely
on a regular basis, ensuring an efficient and effective balance allocation and transfer of resources to
assure that project schedules and deliverable dates are achieved.
3-3 I r ~--
URS
c
c
c
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
The current URS South Florida workload in this depressed economic times is such that we can readily engage
and complete the anticipated work of this RFP without the need to solicit additional professional staff. On
average, URS offices strive to maintain a staff utilization rate of 75:1:%, which provides significant reserve
capacity to accommodate significant additional workload.
Projected
Staff
Utilization
3.3
100
90
80 EXISTING
70 ASSIGNMENTS/CONTRACTS
60
50
40
30
20
10
0
Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July
2011 2011 2011 2011 2011 2012 2012 2012 2012 2012 2012 2012
URS TEAM ROLES AND RESPONIBILlTIES OF KEY STAFF / SERVICES
The URS team of engineering, construction and design professionals we assembled for this RFP have
extensive experience in the evaluation / analysis, planning / studies and reviews as well as the development of
reports, plans/ contract documents that are bid ready and with project and construction management services
to support the two projects that are presented in the City's RFQ.
URS' project manager, Mr. Jose Polo, P.E. will serve as the daily single point of contact for the City of
Sunny Isles Beach regarding construction management, Special Inspection and engineering support services.
Mr. Jose Polo is highly experienced on FDOT bridge projects in providing the various inspections required for
such structures and will bring his expertise and experience to bear on the City's projects. Mr. Polo was the PM
for the recently completed Bridge of Lion's replacement project in St. Augustine, FL and was also the Lead
resident CEI office engineer on the Royale Park Replacement Bridge in downtown West Palm Beach
completed in 2007. Mr. Polo, P.E. will be responsible for the coordination of requests to provide
engineering support services to the URS Engineering principal-in-charge, Mr. Thomas Mullin, P.E., V.P.
Mr. Mullin will be responsible for the coordination of local office support to provide the appropriate engineering
services to the project. He has over 33 years total experience in Geotechnical and Civil Engineering
design projects. Mr. Mullin has been responsible for geotechnical evaluations and design work, for a wide
variety of projects including foundation design of several ports and harbor facilities, power plant structures,
reservoir embankments, transportation facilities, numerous high rise towers, commercial and industrial
facilities.
3-4 I P " g e
URS
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
/"
~
The following is a tabulation of the key discipline lead technical professionals who will be assigned to this
contract, their titles, level of responsibility and identifying resource as either prime (URS) or subconsultant.
(
Yrs. Prime
Name Exp. Title/Position Or Project Responsibility
Sub
Jose Polo, P.E. 24 Project / Construction Prime Project Manager, on-site construction administration
Manager services, direct interface with City's PM, Design
Consultants and Contractors. Provides and
coordinates on-site observations, review of testing /
inspection reports, oversight of Project Budget &
Schedules, Submittal & RFI Logs and Project
Reporting to team and City
Thomas Mullin, P.E. 45 Principal - In -Charge Prime Client Quality Assurance, Contract Resolution,
Resource Allocation of URS team services. Senior
Manager in charge of Engineering Consulting
Services Including Geotechnical & Testing Services
for Projects.
David Wilson, CCM 30 Senior PM/CM Services Prime Oversight Management of Execution of All PM/CM
Manager Services & Tasks; Construction Administration &
Project Management tasks. Management oversight of
...... all vertical/facility PM/CM Services.
"'Oaryl Jones 25 Sr. Geotechnical and Prime Piling and infrastructure/structural inspector.
Piling/Construction Experienced and capable of functioning in an
Inspector Assistant PM role
Keith Stannard 17 Environmental Permitting/ Prime Manage and coordinate for City the submittal and
Processing Support processing of required project permitting for
environmental agencies (FDEP, DERM, EPA, COE,
SFWMD FWS, MDC AHJs).
Jesse Richterkessing 14 Bridge Design & Review Prime Project oversight of Bridge design, geotechnical, civil,
P.E. Lead structural engineering reviews and on-site
construction, materials testing and
observation/reporting.
Michael Sharp, P.E. 28 Geotechnical & Prime Project on-site inspections for geotechnical /
Foundation / Pier foundations / piers and oversight of required testing /
Inspections & Testing reports. Preparation of project construction
observation reports.
Jim Nadaskay, P.E. 31 Structural & Special Prime Management of required Special Inspections and
Inspections, Structural construction structural inspections. Design review
Engineering Lead oversight of structural engineering evaluations, wind
load analysis, structure hardening and foundation
design.
Alfredo Budik, P.E. 22 Soil Borings / Laboratory Sub Soil boring and laboratory testing reports for projects.
-- T estinq
c
3-5 I P ::; g '=
URS
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
. .ino Medina Material Testing Scheduling of field inspectors for Construction
Material T estin Services re uired for projects.
Brett Oldford, P.E. Civil Engineering Lead Prime Management and Design of All General Civil Tasks
(PGD, Roadways, Water, Waste Water Utilities, barrier
island draina e and Stormwater desi n
Raj Shanmugam, P.E. 26 Transportation Consulting Prime Management of all traffic and roadway design including
Lead Traffic Studies, Site Impact Studies, ROW Analysis,
Paving Designs and Signalization Designs and review
of Contractor MOT submittal lans.
Dale Wiley, P.E. 33 Mechanical Engineering Prime Management / Design oversight of mechanical design
Lead including HVAC, fire protection, potable water, pumping
s stems, pipin ,etc.
Chin Li, P.E. 16 Electrical Engineering Sub Management / Design oversight of electrical
Lead engineering including load analysis, T&D evaluation,
Ii htin , roundin ,etc. SBE/WMBE
Thomas Mullin, P.E. 45 Geotechnical Engineering Prime Geotechnical Engineering consulting and management
Lead / oversight of subsurface investigations and laboratory
testing and provision of Geotechnical Engineering
recommendations
c
These seasoned professionals have a very clear understanding of the elements and tasks required by
permitting agencies and regulatory agencies governing the construction of the Sunny Isles Beach pier and
restaurant construction project. Each of them are well familiar and experienced with the required permitting
processes including requirements from MDC resolutions and ordinances and State of Florida Building Codes
and the necessary coordination required to address those permit related issues.
URS' proposed engineering and design professionals are also highly experienced in supplying consulting
services that may require special inspector field observation of construction work including review / oversight
of submittal material presented by contractor for review by the projects EOR.
Resumes of key personnel detailing their relevant experience and qualifications are also included in this
section.
/""'
~
3-6 I P 2. g E
URS
r'
~
~
~
c
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
Resumes are provided in alphabetical order.
3-7 I P ::! g 2
URS
NV5
Alfredo Budik, P.E.,
Vice President, Vertical V-Southeast, Inc.
e Years of Experience - 22
Education
BSCE/1985/Civil Engineering Universidad Metropolitana, Caracas, Venezuela
MSCE/1987/Civil Engineering Northeastern University, Boston, MA
Affiliations / Certifications
Professional Registered Engineer in Florida, No.: 43884
American Society of Civil Engineers
Deep Foundation Institute
Florida Engineering Society
Association of State Dam Safety Officials
Practice Areas
Construction Materials Testing and Inspections
Geotechnical Services
Failure Analysis
Repair Recommendations
Environmental Services
c
c
Mr. Budik is a Florida licensed professional engineer with more than 22 years of experience in
geotechnical, foundation, drilling and construction materials testing. Mr. Budik has been with the
operations since 1991 and has successfully provided these services for municipal, waterfront, civil,
roadways, runways and structures ranging from simple residential housing to 60 stories high.
=> Project Engineer for Mooring Bollards Inspection including load tests, concrete testing and quality
assurance of structure along the cruise terminal wharf at the Port of Miami.
=> Project Engineer for Materials Testing Services for Sheet Piles testing for Port of Miami Wharves.
=> Project Engineer for vibration analysis and testing services for the Port of Miami Tunnel.
=> Project Engineer for load tests per FOOT specifications at the Port of Miami Tunnel.
=> Project Engineer for Geotechnical Engineering and Testing Services Contract for the City of Sunrise
since 2005 - Projects include Public Safety Complex, roadway construction, recreation and utility,
emergency canal bank failure engineering services and geotechnical engineering, materials testing
and construction inspection.
=> Project Engineer for Quality Control materials testing and geotechnical engineering including
installation of 24-inch diameter augercast piles and 24-inch prestressed piles for the $259 Million
people mover project at Miami International Airport, Miami, FL.
=> Project Manager for the construction of monitoring wells including QC/QA management of drilling
operations, supply management, permitting and environmental control and compliance: City of Ft.
Lauderdale, Snapper Creek Well Field; Marlins Stadium; and Bahia Honda State Park.
=> Project Engineer for U.S. Army Corps of Engineers projects providing Quality Assurance Materials
Testing service for projects including Water Deliveries Project at State Road 90 and Herbert Hoover
Dike #5 and #6.
=> Project Manager for the Geotechnical Engineering and Testing Services Contract with the South
Florida Water Management District - Projects consists of levee, embankments, wells and dredging.
=> Project Engineer for the 1.2 miles Waterways Bulkhead Rehabilitation in Aventura which included
materials testing and inspection of steel bracing attached to severely deteriorated piles, specialized
drains that were installed through the bulkhead face into the upland soils to relieve the hydrostatic
pressure.
Vertical V-Southeast, Inc,
c
Areas of Expertise
MEP design for Commercial,
Educational and
Governmental facilities in
the field of HVAC, power
distribution, illumination,
plumbing and fire protection
Familiar with building
control technologies/Energy
Management Systems
including Microprocessor,
Pneumatic and PLC controls.
Years of Experience
16 Years Experience with
more than 5 years at LH
Engineering Inc.
Education
c
Master of Science in
Mechanical Engineering,
Florida International
University, Miami, 1994
Master of Science in
Engineering Mechanics,
University of Science &
Technology of China, Hefei,
China, 1991
Bachelor of Science in
Engineering Mechanics,
University of Science &
Technology of China, Hefei,
China, 1987
Reg istra ti 0 n/ Certifica tio n
P.E. in Mechanical
Engineering, 1998
P.E. in Electrical
Engineering, 2002
Florida PE No. 52692
c
LEED Accredited
Professional,2008
LH Engineering, Inc.
Chen Li, PE
Project Manage~ Senior Mechanical & Electrical Engineer
Overview
As the owner and Senior Project Engineer with LH Engineering
Inc., l\Irs. Li is responsible for project management, coordination
and oversight. Her responsibilities start from preliminary
engineering, design & development, and continue through
construction. She is familiar with system analysis, system selection,
working drawing production, specifications, and construction
administration and management.
Prior to LH Engineering, Mrs. Li practiced engineering at EMTec
Corporation in Coral Gables where she was senior project engineer
and project manager for designing HVAC and elecu"ical power
systems for non-residential projects; Advanced Control
Corporation in Fort Lauderdale, where she was system engineer
desib>1ling Building Management, Smoke Control & Evacuation and
Access Control Systems for residential, commercial, institutional
and industrial facilities and Anderson-William Consulting
Engineers, Inc. where she is mechanical engineer for designing
educational facilities. Her project highlights include: HV AC and
lighting system upgrade for Miami International Airport; Complete
upgrading the Homestead Airfield I ,ighting Systems; 2"J year of the
AE (MEP) scoping of the 5-year deficiency report for Miami Dade
County Public Schools, Regions 3 & 4; HV AC and power/lighting
system desib>1l for Charles E. Bennett Federal Building; Plumbing
and fire protection system design for USDA Office Complex,
Washington, D.C.; EMS & smoke contl"Ol system for the
Performing Art Center and Opera House of the Great Miami; BMS
for Palm Beach County and Broward County Community Colleges,
etc.
A partial listing of 1\1rs. Li experiences with LH Engineering Inc.:
Project Specific Experience
Professional HVAC Engineering Consultant Services, City of Coral
Springs, Florida
Project coordinator/manager for the 5-year open-ended contract
entitled as "ProfessionalHV AC Engineering Consultant Services
Continuing Agreement" with the City of Coral Springs.
. Project Management to supersede the AHU Replacement at
the Coral Springs Charter School 600 wing-2009
. Energy Audit/Study for the facilities owned by the City of
Coral Springs, 2008-2010
c
. Design and Construction Management for Coral Springs
Charter School Chiller Replacement, 2007
Professional HVAC Engineering Consultant Services,
City of Greenacres, Florida
. Feasibility study of the improvement of air conditioning
system for the city of Greenacres Community Centers, 2008
. Feasibility study of the improvement of air conditioning
system for the phase I of Public Safety Building, 2009
Cooper City High School AHU Replacement, 2007
Mechanical and electrical systems design for air handler unit
replacement, serving auditorium stage, classrooms at media centers
and gymnasium.
Broward County Public Schools, 2003-2010
Collaborating with Roth Bros Inc. to provide engineering design
services for the Broward County Public Schools Automatic Control
Systems. Responsible for system design; bills of materials; valve and
damper selections; troubleshooting; submittal and as-built drawings.
c
Indian River County Public Schools, 2004-2009
Collaborating with Roth Bros Inc. to provide engineering design
services for the Indian River County Public Schools Energy
Management Systems. Responsible for system design; bills of
materials; valve and damper selections; submittal and as-built
drawings.
Property Condition Assessment for Commercial and Industrial
Buildings, 2007
Provided level 1 property condition assessment for office and
industrial buildings. Responsible for MEP system evaluations and
cost estlmates.
The selected facilities assessed:
Sarasota County Administration Building (Electrical Systems)
Sarasota County Criminal Justice Building (Electrical Systems)
Sarasota County Jails (Electrical Systems)
Group of five (5) industrial buildings at Norcross, Georgia (MEP)
Margate Northwest Family and Health Center (MEP)
Kendall Atrium (MEP)
South Plantation Medical Office Building I (TYIEP)
Westside Medical Art Buildings (MEP)
c
2
r'
~
Areas of Expertise
Program Controls, Project
l\lanagemem. Project Scheduling,
Cash Flow ,\nal\'sis. Cost Estimating
and \'alue Engineering, Design
Oversight and Review. Contract
and Subcontract ~-\dminis(ration
Years of Experience
\\'ith L'RS: 10 Years
\\-ith Other Finm;: ~ Years
Education
c
l\1aster of Science.
Construction \Ianagement. 2002
Florida 1 n tema tiona] C niHTsitr.
~liami. ];L
Bachelor of Science.
Chemical Engineering. I <JC)5.
Pol\'{echnic Cniversit\-. Farmingclalc.
NY
Registration / Certification
LEED Accredited Professional
201l I Certified C;('ncra] C011lracror
CGC 1510652
c
URS
Natalie D. DuQuesnay, LEED AP
Project Manager
Overview
Natalie DuQuesnay has over 12 veal'S of expenence 111 Airport, Solid
\'Vaste and Facilities Management. A self motivated, consistent on-time
performer and an innovative construction management professional. 1'\'ls.
DuQuesnay is a recognized analytica] problem solver, policy interpreter,
and accomplished planner/ organizer. Experience includes program
controls, the project management of multiple, concurrent projects,
contract administration, permitting, cost estimating, scheduling and
construction claims.
Project Specific Experience
Solid Waste Authority of Palm Beach County, West Palm Beach, FL
Program Controls Manager, 01/08 - Present
Provided services to assist the SW A staff in support of the SW A Capital
Improvement Bond Program in schedule, budget, cash flow tracking and
forecasting, and construction management support on selected projects.
Services include high level review of program activities and project
deliverables as requested by SWA. Development of Capital Project
Budgets, Cash Flow Analysis and Development of Cash Flow Forecast,
E':stimating and Development of Master Program Schedule to illustrate
major activities and milestones including planning, design, permitting,
procurement and construction
Biscayne Landing Town Center, City of North Miami, FL
Vista View Park Expansion, Town of Davie, FL
Sheraton Bal Harbour, Village of Bal Harbour, FL
Construction Engineer 08/07 - 01108
Development of guidelines for the preparation of a Stormwaster Pollution
Prevention Plan including completion of Notice of Intent to Use Generic
Permit for Stormwater Discharge and developing a sample Storm \'Vater
Pollution Prevention Plan for Client to present to the General Contractor,
Development of general program schedules to illustrate major activities
and milestones such as planning, design, permitting, procurement and
construction, Development of proposals and design fee negotiation,
Design oversight including plan and submittal reviews, Assisting design
professionals with permitting process, Interpretation of state and local
codes and ordinances, Development of Probable Construction Cost
Estimates and Civil Engineering Design.
City of Fort Lauderdale, Firestation Bond Pgrm, Ft. Lauderdale, FL
Project Manager 11/06 - 07/07
Development of general program schedules to illustrate major activities
and milestones such as planning, design, permitting, procurement and
construction, Analysis of updated project schedules to ensure adherence
to the critical path, Review of time impact analysis and delay claims,
URS
Natalie D. DuQuesnay (Cont'd)
r-
~
Administration of client's contract with architectural/engineering firm
including review of proposals and design fee negotiation, Design
oversight including plan and submittal reviews, Assisting design
professionals with permitting process, Interpretation of state and local
codes and ordinances, General construction oversight including the
review and response to contractor's request for information, shop
drawing submittal review, daily reports and supervision of construction
activities to ensure adherence to plans and specifications, Development
and review of construction cost estimates, Development of monthly
reports
c
Fort Lauderdale-Hollywood International Airport, Ft. Lauderdale, FL
Assistant Project Manager 02106 -11/06
Project Manager for the Terminal 4 Phase IB FIS/ ATO Expansion
Project ($34 million). Primary responsibilities include coordination of
construction activities with the various Airlines and the Broward County
Aviation Department, Contractor negotiations for a CM at Risk contract,
Administration of the County's contract with the
architectural/ engineering firm, Review of architect/engineer proposals
and negotiation of fees, Design oversight including plan and submittal
reviews, Assisting design professionals with permitting process,
interpretation of building code regulations and calculations, Development
of design and construction cost estimates, Project scheduling and review
of architect/engineer and contractor payment applications, Management
of project staff including project engineer, inspector and administrative
asslstan t.
City of Miami, Capital Improvements Program, Miami, FL
Project Manager 09/04 - 02106
Project Manager primarily responsible for Planning, Administration of
Design Contracts and Construction Management for the City of Miami
Capital Improvements Program. As a Project Manager her
responsibilities include assisting client departments with Scope Definition,
l\dministering the City's contracts with various architectural and
engineering firms, Construction Management and general coordination of
design and construction phases. Additionally, Natalie provides support in
areas such as review of architect/engineer proposals and negotiation of
fees, design oversight including plan and submittal reviews, Assisting
design professionals with permitting process, interpretation of building
code regulations and calculations, development of design and
construction cost estimates, project scheduling and revIew of
architect/ engineer and contractor payment applications. Her projects
have included design and construction administration of Robert King
High Recreation Building and Site Improvements ($2 million), Virrick
Park Library Addition ($2 million).
c
Washington Mutual Bank, Lake Worth, FL
2
URS
Natalie D. DuQuesnay (Cont'd)
c
Project Manager 08/03 - 09/04
Project Manger providing Design and Construction Management Services
to \Vashington Mutual Bank Construction Division. As a Project Manger
her responsibilities included construction management of concurrent
projects (as many as 20) and coordination of general contractor,
subcontractors and ,"endor services. She further provided support to the
\Vashington Mutual Real Estate Group in Building and Land Acquisition
and Feasibility Studies.
~
~
City of Miami Beach, Capital Improvement Program, Miami Beach, FL
Project Manager 11/01 - 08/03
Project Manager providing Planning, Design and Construction
Management Services to the City of Miami Beach as part of the Parks and
Facilities Program Management contract awarded to URS CCHvoration.
f\S a Project Manager her responsibilities include; administering the City's
contracts with various Design Professionals and Contractors while
coordinating all design and construction efforts. She further provides
support in areas such as plan reviews, contract scoping, document
controls, payment submittals, change orders and construction claims. Her
projects have included construction management and administration for
the Bayshore Golf Course ($6 million), administration of the design and
construction management for the Bayshore Clubhouse ($5 million). She
has also managed design contracts for clubhouses and developed desif,'11er
solicitation documents for other projects.
Fort Lauderdale-Hollywood International Airport, Ft. Lauderdale, FL
Assistant Project Manager 05/98 - 11/01
Assistant Project Manager for the Renovation/Expansion of the existing
terminal buildings ($30 million). Primarily responsible for coordination
and construction management of interior renovation of (3)-terminal
buildings each (2)-story in height. Coordinated procurement of
contracting methods, development and implementation of project
phasing, bidding/contracting and construction phase of the projects with
the design consultants and general contractors. Responsible for
coordination with the airlines, tenants and Broward County Aviation
department officials. Developed and managed a team to design,
coordinate and implement special systems and a communications
infrastructure to allow data and communications interfacing between all
three terminals and the Administration Building.
c
Allied Signal Inc., Morristown, New Jersey
Process Engineer 01/96 - 04/98
Served as Process Engineer and was in charge of the process modeling of
batch and continuous distillation columns, reactors, and heat exchangers
using ASPEN and CHEMCAD simulation software. }t!so oversaw the
development of process flow diagrams and process and instrumentation
diagrams, equipment lists, material and balances for forward engineering
projects. Other projects included the development of Level 1 and 2 cost
estimates for a thermal oxidation unit and aqueous wastewater treatment
unit of a fluorocarbon plant using the existing design as a basis, including
3
URS
Natalie D. DuQuesnay (Cont'd)
,-
~
equipment purchase cost, pIpmg isometrics, valve counts, and
instrumentation loops. Also implemented existing cost estimation package
and QUESTIMA TE software and patent research into existing
technology for the purification of HCFe's, reactor construction and
design, catalysts, and priIling towers.
Professional Societies! Affiliates
American Institute of Chemical Engineers
Languages
English
Specialized Training
2006 Project Manager's Certification
2008 URS Health and Safety
Security Clearance
Fort Lauderdale - Hollywood Internationall\irport Security Clearance
Contact Information
Phone (954) 868-8093
/'"
~
c
4
c
Areas of Expertise
ConsTruction O\'ersight Supelyision
Site De\'e]opmeml L tility J lJSpection
Construction J nspectionl and
\Ianagement
Larthwork Inspection
Quality Control Testing
Geotechnical Studies, In situ '] csting
"Den' Certified Piling Inspector
F])()T Cerufied Drilled Shafl Inspector
\\'ell Installation Supen'islOn
Years of Experience
With L'RS: 27 Years
\\'ith Other Firms: ; Years
Education
c
.\,\ 1 .\:isoci;lle of .\rts 111 I;ngineenng
SClenCl's, Palm I'Sc;lCh .Junior College
Certification
FDOT Certified Drilled Shaft Jns]wc[ot
]:1)0'1' Certified Piling JlJSpcctor
I razardous \\';lste held JnH'''ligatiolls
.\SbCSl()S f Iazard r:mcrgel1C\' Response
,\Cl plll-:JZ.\) lnspect()[.
Nuclear'l cst Eljuipmenl (Tr():dcri
( ~crllticd
Pile [ntegrin' Test I ~llUip1l1l'11t
c
URS
Daryl E. Jones
Senior Geotechnical/Civil Engineering Inspector and Construction
Manager
Overview
tvir. Jones joined URS in 1984 and has over 27 years of experience
providing on-site construction quality inspection, testing, site
development oversight, reporting on numerous earthwork and
foundation construction projects and in performing site
geotechnical investigations. Typical projects are described below.
Project Specific Experience
· Supervision and inspection of earthworks constructlon
for SF\X1MD Stormwater Treatment Area Projects STA 5 Flow way
3 and STJ\ 6 Section 2. Projects included the construction of over
17 miles of impoundment dams and seventeen (17) flow control
structures.
· With URS as the prime contractor, directed construction
efforts for a 34,000 cu. ft. roller compacted concrete dam in Banks
County, Georgia.
· Administered Construction Management Services for the
Southwest Transfer Station Utility Relocation Project, a Solid \X1aste
Authority contract in Delray Beach, Florida. Responsible for the
management of the construction contract, coordinating inspections
with the local agencies, review of change orders and for approval of
payment applications. Monitored the construction activities for the
placement of 0.75 mi. of 12" water main and 8" force main which
encompassed a jack and boring operation beneath a four lane
highway and an aerial crossing of a water body. 01/09-07/09.
· Construction inspection and compaction control for
over 7 miles of excavation and backfill including replacement of
flood control levees for installation of a 36" diameter high pressure
natural gas pipeline for Gulfstream Pipeline Co., Palm Beach Co.,
Florida.
· Conducted subsurface investigation by means of static
cone penetration, test borings (recovery of disturbed and
undisturbed samples), rock coring techniques, exploratory trenches
and permeability tests for numerous projects throughout Florida.
· Classification and laboratory analysis of cohesive and
non-cohesive soil samples from eng1l1eering borings plus
performance monitoring of in situ testing in various engineering
projects throughout Florida, Bahamas and Caribbean Islands.
· Supervision of subsurface densification by means of
vibrocompaction and dynamic compaction throughout South
Florida and pressure grouting at L'Hermitage (Palm Beach, Florida)
and Williams Island Tower (North Miami, Florida).
URS
Daryl Jones (cont'd.)
c
c
. Supervision and inspection of cast-in-place (pressure
grouted auger) piles at numerous projects throughout South Florida
including North Broward County Resource Recovery Facility
(pompano Beach), Towers at Mullet Bay (Saint ~1aarten,
Netherlands Antilles), and Crystal Palace Expansion (Nassau,
Bahamas).
. Supervision, installation and monitoring of settlement
casing at City of Fort Lauderdale's Composting Facilities.
Surveillance and inspection of augercast pile installation for the 44-
story Diamond "C" Condominium in South Miami Beach, Florida
. Directed field geotechnical studies for the 2,500 acre,
3,000 :tvf\'V' FPC Polk County Power Plant Site
. Responsible for heading field work for subsurface
exploration for Disney's Studio Tour, Disney Center Hotel and
Convention Facility at Walt Disney World in Orlando, Florida Co-
directed engineering soil boring program, performance of
geophysical survey of soil samples collected in conjunction with
FDOT State Proposal for Super Conducting Super Collider
(Nassau County, Florida)
. Supervision and inspection of drilled shaft (caisson)
foundations Martinigue 1I Condominium (Singer Island, Florida)
· Supervision of driven prestressed concrete piles,
Sawgrass Industrial Park Bridge at S.R. 84 (Fort Lauderdale,
Florida) and North Broward County Resource Recovery Facility
(pompano Beach)
. Inspection of cast-in-place step taper piles, Sun Bank
Center (Orlando, Florida)
. Performance of numerous pile load tests in compression,
tension and lateral loading
· Surveillance and inspection of site improvement using
vibroflotation stone columns for fuel storage tanks constructed
over soft hydraulic fill and bay bottom sediments at I-lookers Point,
Tampa, plus 266,000 barrel LNG storage tank in Salley, South
Carolina.
. Surveillance and inspection of site improvement by
means of demucking and backfilling, degrubbing, and detrashing at
numerous projects throughout South Florida.
· Performance of nondestructive pile integrity testing on
cassions at MacArthur Causeway (1-395) and auger pressure grouted
piles at Diamond "c" Condominium, iv1iami, Florida.
. In conjunction with the environmental remediation at
the Petro Chemical Products plant in Jacksonville, Florida, directed
the excavation, restoration, and deployments of erosion control
systems along 3/4 miles of drainage tributary to St. Johns River.
· Responsible for placement of settlement plates and
monitoring of surcharge settlement at Falconara II Condominiums
(Singer Island, Florida) and Mystic Pointe (North Miami, Florida).
c
2
URS
Daryl Jones (cont'd.)
c
c
. Inspected the installation of methane venting system and
synthetic lining placement, sampling and testing, North Broward
Resource Recovery Facility (pompano Beach, Florida).
· Subdivision development oversight of the \Vest Glen and
partial Eagle Trace residential communities in Coral Springs,
Florida as well as various commercial properties in Broward
County, Florida. Responsibilities included the verification of
roadway and building pad grades and densification, surveillance of
water line, sewer and drainage placement. Perform lamp light
inspections of sewer and drainage lines and monitored pressure
tests of water and force main lines.
· Responsible for the inspection of construction and
installation of deep aquifer injection well, logging, field water quality
analysis and water quality sample collection and conducted water
level monitoring in shallow and intermediate observation wells
during deep well injection testing for South Beaches Project,
Brevard County, Florida.
· Supervised construction and installation of test water
supply wells, in addition to collecting pumping test data which was
used to support a water supply study in Broward County, Florida.
· Assisted in the performance of asbestos facility survey
(AI-IERA) for Monmouth County School Board, all 1(-12 schools
in Monmouth County, New Jersey.
Major FDOT Bridge and High Rise Drilled Shaft
Foundation Projects
SR No. AlA, Bridge of Lion's Bascule Bridge Rehabilitation,
St. Augustine, FL - 8/06 to 12/07
FDOT District II
FDOT Construction Project Manager: Jeff Williams (561) 366-6800
Surveillance and inspection of drilled shafts construction for the SR
AlA Bascule Bridge Rehabilitation over the Intracoastal
\Vaterway/Matanzas River, S1. Augustine, Florida. Installed 140
shafts varying from 3' to 8' in diameter to depths of up to 135 feet
deep. Operated Mini-SID and monitored/reviewed CSL testing
data.
c
Quantum High Rise Condominium Project, Miami, Fl -
06/04 to 02/05
Terra Group International
Cons truction Manager: Jorge Fuen tes
Surveillance and inspection of drilled shaft construction for twin 45
to 54 story high condominium towers. Installed 210 high capacity
drilled shafts varying in diameter from 3' to 5' to depths of up to
145' below the ground surface. Installed and monitored/reviewed
CSL testing data for mono shafts beneath highly loaded columns
for the tower.
3
URS
Daryl Jones (cont'd.)
,-..
~
SR 704 Royal Park Replacement Bascule Bridge, West Palm
Beach, FL - 1/02 to 01/04
Surveillance and inspection of drilled shafts construction for the SR
704 Bascule Bridge over the Intracoastal \X1aterway, \X1est Palm
Beach, Florida. Installed over 100 shafts, 4' diameter to depths of
up to 35 meters deep. Operated lviini-SID and
monitored/reviewed CSL testing data
SR 804 (Ocean Avenue) Replacement Bascule Bridge,
Boynton Beach, FL - 1/99 to 6/00
Surveillance and inspection of drilled shafts and pressure grouted,
auger pile construction for the SR 804 Bridge over the Intracoastal
\X1aterway, Boynton Beach, Florida. Installed over 80 drilled shafts
and 50 ACIP piles. Provided CEl of 40 foot high reinforced earth
approach embankment construction including monitoring of
geotechnical pore pressure cells, settlement plates and slope
indicator casings.
,..--
~
17th Street Causeway Replacement Bascule Bridge, Fort
Lauderdale, Florida - 2/98 to 5/98
Surveillance and inspection of drilled test shaft construction for the
17th Street Causeway Bridge over the Intracoastal \X1aterway as part
of District-wide contract for the testing and analysis of bridge
foundations.
SR 20 Replacement Bridge, Blountstown, Florida - 8/96 to
3/97
Surveillance and inspection of drilled shaft construction for the SR
20 Bridge over the Apalachicola River. Installed over 100 drilled
shafts with diameters ranging from 4 to 9 feet to depths up to 100
feet deep. Operated SID and performed slurry density testing.
State Road AlA (MacArthur Causeway), Miami, Florida -
12/93 to 3/96
Surveillance and inspection of drilled shaft construction for the
MacArthur Causeway Bridge (1-395), Miami, Florida. Project
included installation of over 100 large diameter drilled shafts
ranging in diameter from 3-1/2 to 7 feet and depths up to 115 feet
below water line.
c
4
Lino Medina, Construction Materials Testing Manager
Vertical V-Southeast, Inc.
e Years of Experience - 12
NV5
e
c
Education
Universidad de Granada, Facultad de Medicina - (1971-1972)
University of Cincinnati - Physiology - (1970-1971)
Nassau Community College - Laboratory Technology (1969-1970)
Affiliations / Certifications
ACI
Concrete Strength Testing Technician
Concrete Field Testing Technician I
FDOT
Asphalt Paving Technician Level 1 & 2
Asphalt Plant Level 1
Concrete Field Technician Level 1
Earthwork Level 1 & 2
MSE Wall Inspector
Augercast Pile
QC Manager
Troxler Nuclear Gauge User and Hazmat Safety
Radiation Safety Officer
A WS Member
Mr. Medina is responsible for all daily operations, including field testing scheduling, QA/QC, maintenance of
equipment, coordination with technicians, establishing and monitoring of safety plans and support for laboratory
testing. In addition, Mr. Medina has extensive experience with projects providing quality control/quality assurance
testing and support services for project completion. His responsibilities include managing technicians to maintain
a high degree of performance and efficiency and be able to provide seamless coverage of all testing and
inspection requirements.
EXPERIENCE
~ Construction Materials Testing Manager for Mooring Bollards Inspection including load tests, concrete testing
and quality assurance of structure along the cruise terminal wharf at the Port of Miami.
~ Construction Materials Testing for Sheet Piles testing for Wharves at the Port of Miami.
~ Construction Materials Testing Manager for the Geotechnical Engineering and Testing Services Contract with
the South Florida Water Management District - Projects include dredging operations, pump stations, levee,
embankments and wells.
~ Project Engineer for U.S. Army Corps of Engineers projects providing Quality Assurance Materials Testing
service for projects including Water Deliveries Project at State Road 90 and Herbert Hoover Dike #5 and #6.
~ Construction Materials Testing and Inspection services for MDX Projects
MDX Project #30021 - S.R. 836 Pavement Rehabilitation - Verification Testing
MDX Project #40027 - Guardrail Safety Improvements - Verification Testing
MDX Project #40033 - Median Guardrail Improvements - Verification Testing
MDX Project #50018 - Emergency Bridge Repairs - Verification Testing
MDX Project #924045 - S.R. 924 East Bound Ramp - Verification Testing
MDX Project #83623 - S.R. 836 East Bound - Verification Testing
MDX Project #87412 - S.R. 874 ORT Infrastructure Mods - Verification Testing
~ Materials Testing Manager for Miami-Dade County construction of a five lane roadway including center turn
lane, sidewalks, curb and gutter, continuous stormwater drainage system, roadway lighting, pavement
markings, and signing and traffic signalization. The work also includes W ASD's installation of 24" and 16"
water mains, and 24" force main, and other appurtenances along SW 184th Street from SW 147th Avenue to
SW 137th Avenue.
~ Superintendent / Coordinator - Miami International Airport - North Terminal Development - Performed
hundreds of individual samplings, testing, and inspections and emergency coverage when insufficient or no
previous notification of request for testing was available. Performed many additional specialized test
procedures including GPR, Ultrasound, Radiography and other NDT of steel.
Vertical V-Southeast, Inc,
c
c
c
Areas of Expertise
Soils and Founda tion Engineering
Ciyil Construction f\lanagcment
Croundwater !-[Hlmgeology
Qualit\" Control Testing and
Inspection
Years of Experience
\\'ith L'RS: 21 Years
\\'ith Other hrms: J 2 \"ears
Education
"laster uf SCIence in C;eutechnica]
[~nginecring, I ()7(), L nivcrs1f\" uf
J1lin ois
Bachelor uf Science in Ciyil
I::nginecring, I ()7+, Lini\Trsil\" of
Illinois
Registration/ Certification
ProfeSSIonal Eni!:ineer. #-L,\:;()(j
(Florida), I <)<)( I
Professional Affiliations
,\merican Society of Ciyil
j ~ngineertng (.\SC [:)
,\mcrican ,\ssociation of State D;1m
S;1fel\' Officials (,\,\5DSO)
URS
Thomas F. Mullin, PE
VIce President- Manager of Engineering & Geotechnical Design
Services, Boca Raton FI
Overview
Mr. Mullin has over thirty-three (33) years total experience on civil and
foundation design projects and on civil construction projects. 1\1r. Mullin
has been responsible for geotechnical design work on a wide variety of
projects, including foundation design of water/wastewater treatment
facilities/infrastructure and other industrial structures, nuclear and fossil
fuel power plant structures, reservoir embankments, transportation
facilities, ports and harbor structures, numerous high rises, landfills and
commercial and industrial structures. Mr. Mullin has lead the civil design
efforts for over 16,000 Acres of Stormwater Treatment .Areas in the
Florida Everglades. He has extensive experience pertaining to foundation
design and construction, site earthworks and structural backfilling,
foundation load test programs, earthwork and QCQM testing procedures
and documentation, installation and evaluation of geotechnical monitoring
instrumentation and state-of-the-art pile and drilled shaft load testing. Mr.
Mullin presently serves as the Ceotechnical and Civil Desit,l11 Services
Manager for the URS Boca Raton, Fl office. Mr. Mullin also has extended
field experience as a contract/construction superintendent for civil site
development construction work.
Ports and Harbor Projects
Principal Design Consultant for Dredging Design and Spoils Containment
Facility for the 1500 Ac. Lake Trafford Critical Restoration Project,
Collier Co., 1"1
Geotechnical Consultant for evaluating dredge spoil suitability in support
of the City of Hollywood, Dredging Feasibility Study, Hollywood Fl.
Geotechnical Consultant for the Confined Disposal Facility Design for
the Eastside Engineering Study for Broward County, FI. Preliminary
concept design for the storage of 3.5 MCY of dredge spoil from Port
Everglades, FI to be stored and subsequently used in R27 Runway
extension at the FI. Lauderdale International Airport, Broward Co., FI.
Ceotechnical Consultant to Port Everglades, FI for Geotechnical drilling,
sampling and materials evaluation for 5+ MCY of maintenance and
new dredging for the Port Everglades Navigation Project, Broward
Co., Fl
Geotechnical consultant for the Preliminary Design of the Freeport
Harbor Container Bulkhead and Terminal, Freeport, Grand Bahamas.
Principal geotechnical consultant for design and construction of the Five
Star Emerald Bay Resort and Marina complex, Exuma Is., Bahamas.
URS
Thomas F Mullin, PE (cont'd.)
c
Principal geotechnical consultant for the design and construction of the
160-acre South Port VI, VII and VIII Container Storage Yards, Port
Everglades, FL.
Principal geotechnical consultant for the 600-LF Naval Pier Extension
Project, Gulf of Mexico, Port of Gulfport, MS.
Geotechnical consultant for the Preliminary Design of the Freeport
Harbour Container Bulkhead and Container Terminal, Freeport,
Grand Bahamas
Principal geotechnical consultant for design and construction of Port
Everglades South Port IV, Crane Rail Extension, Port Everglades,
FL.
Principal geotechnical consultant for the Feasibility Study/Preliminary
design for the 30 acre West Pier Development, Hydraulic Landfill
Reclamation Container Yard Expansion, Port of Gulfport, MS.
Principal geotechnical consultant for the Dole Wharf Upgrade Project,
Port of Gulfport, MS.
"
~
Principal geotechnical consultant for the design and construction of the
25-acre East Pier, Dole Refrigerated Container Storage Yard
Expansion, Port of Gulfport, MS.
Principal geotechnical consultant for the preliminary design of the
Automobile Import Storage Operations (AlSO) Expansion Project,
Port ofSt..Joe, FL.
Principal geotechnical consultant for design and construction of the 45-
acre South Port V Container Storage Yard over an old construction
debris landfill, Port Everglades, FL.
Expert Consultant for the Evaluation of the Rybovich Marina
Boatyard Pavement Failure in West Palm Beach Florida. Marina
pavement failed under the heavy wheel loads of a 600 Ton Travel Lift,
only one of three such heavy lifts in the World. The travel lift is capable
of lifting out and handling 250' long super yachts for yard servicing and
repair purposes.
FDOT and Transportation Projects
c
Principal Geotechnical Consultant for foundation construction inspection
and testing, analysis services on several major South Florida bridges. Also
directed, quality control of Pile Driving Analysis (pD!\) of driven piles
and drilled shaft CEl services and provided design/ claims consulting on
the following projects:
URS
Thomas F. Mullin PE (cont'd.)
,-
~
Historical Bridge of Lions Replacement Project over the Intracoastal
Waterway, St. Augustine, FI- 9/06 to Present FDOT District II
Royale Park Replacement Bascule Bridge over the Intracoastal
Waterway,Town of Palm Beach, Florida -10/01 to 10/04
FDOT District IV
SR 858 Hallandale Beach Replacement Bascule Bridge over the
Intracoastal \V'aterway, Hallandale Beach, Florida - 10/98 to 2/03
FDOT District IV
SR 804 Ocean Avenue Replacement Bascule Bridge over the
Intracoastal Waterway, Boynton Beach, Florida - 1/99 to 7/01
FDOT District IV
Florida Turnpike-wide PDA testing, Ci\PWAP Analysis and
Geotechnical Engineering Services - 8/99 to 12/02
FDOT Turnpike
District Wide Testing and Analysis of Bridge Foundations, 1/98 to
12/02. FDOT District IV
c
Venetian Causeway Historical Bridge Renovations (West Bascule),
Miami, Florida - 10/97 to 4/98 FDOT District VI
State Road AlA (MacArthur Causeway) Bridge Replacement, Miami,
Florida 12/93 to 3/96 FDOT District VI
Principal Consultant, Geotechnical Engineering for the SRAlA Key Deer
Bridge Overpasses, Florida Keys.
Project Consultan t for drilled shaft construction at the SR 20
Appalachicola River, Replacement Bridge, Blountstown, Florida.
Principal Consultant, Geotechnical Engineer for geotechnical design
review and construction pile driving CEI and vibration
monitoring/evaluation for the 1-95 HOV Design Build contract with
FDOT IV, Palm Beach County, Fl.
Principal Consultant for Geotechnical Instrumentation and
Monitoring/Reporting for Surcharging of thick roadway peat deposits on
0.87 miles of SR15 Widening north of Belle Glade, FI
Water Resources Projects
c
Principal Civil Design and Geotechnical Consultant for the concept
design of the Cape Sable Dam Restoration projects, Everglades
National Park, FI. The initial work included the concept development,
costing and alternatives evaluation for the restoration of two failed
URS
Thomas F. Mullin, PE (cont'd.)
,-
~
sheetpile wall dams in support of the development of the EA for
permitting and approval of the project.
Lead Principal Design Manager and Geotechnical Consultant,
SFWMD Compartment C Buildout Project, Hendry Co. FI.. (2006 -
2009) Managed the design development of 6240 Acres of impounded
man made wetlands in three separate Stormwater Treatment Area flow
\X7ays. The design included over 18 miles of 8' - 10' high levees and 18
gated flow control RCB Culverts to impound and direct stormwater
through manmade filtering wetlands constructed over the Everglade
peats. Directed field geotechnical investigation programs and designs
including over 100 borings. Directed Civil construction plans and
specifications development.
,....
~
Lead Principal Design Manager and Geotechnical Consultant,
SFWMD Lake Trafford Critical Restoration Dredging Project,
Collier Co, FI.. (2004 -Present). Managed the geotechnical investigation
and design for the dredging of over 2500 acres of lake area in three
separate phases, to remove organic muck sediments from the lake bottom.
Directed muck sediment sampling and testing programs and prepared civil
and structural plans [or lhc dredgiug aud fur lhe earlhwork cunsITuction
of a 500 Ac confined disposal facility Directed construction phase
resident engineering and QA/QC of earthworks construction for the
Phase 1 interior 1000 Ac dredging. Phase II dredging of near shore areas
500 acreas and the Phase III re-dredging of the Phase 1 area which is
currently is in progress (May 2(10).
Lead Principal Design Manager and Geotechnical Consultant,
SFWMD ST A 5 Flow Way 3 and ST A 6 Section 2 Projects, Hendry
Co, FI.. (2004 - 2007) Managed the design development of 4000 Acres
of impounded man made wetlands in two separate Stormwater Treatment
Areas. The design included over 17.5 miles of 8' - 10' high levees and 17
gated flow control RCB Culverts to impound and direct stormwater
through 6500 acres of manmade filtering wetlands constructed over the
Everglade peats. Directed field geotechnical investigation programs and
designs including over 100 borings. Directed Civil construction plans and
specifications and provided construction phase engineering support.
c
Principal In Charge and Lead Geotechnical Consultant,
Comprehensive Everglades Restoration Projects (CERP) - Biscayne
Bay Coastal Wetlands (BBCW) Phase I projects including Deering
Estates and Cutler Coastal Wetlands Flow Ways, Dade Co. FI..
(2005 -Present). The Deering Flow Way includes 1/4 mile of extended
canal to a new 100 cfs Pumping station and the Cutler project includes
1.32 miles of above ground levee and concrete lined Flow Way. Directed
field geotechnical investigation programs and designs for the projects
including over 50 borings. Overviewed Civil construction plans and
specifications.
URS
Thomas F. Mullin, PE (cont'd.)
,..
~
Principal Geotechnical Consultant for the SFWMD ENR Test Cells,
Palm Beach Co., Fl (1997 - 1999). Managed the geotechnical
investigation analysis and re-design for 2, 15 acre test cell sites for the
Everglades Nutrient Removal Project. Existing test cells were found by
full scale field tests to leak excessively therein potentially invalidating
planned nutrient uptake research in the cells. Civil design plans and
specifications were developed and provided to re-construct the cells with
an impermeable synthetic HDPE liner. Provided construction phase
engineering design support.
Principal Geotechnical Consultant For The Peer Design Review Of
SFWMD Stormwater Treatment Areas 1W, 5 and 6, Palm Beach
County, FI (1997- 1999). Provided geotechnical Peer Reviews of
geotechnical analyses and designs by others for 3 S'L\s. Also provided
construction expert claims and litigation support during the post
construction phase of the project.
c
Lead Geotechnical Consultant for The 720 Acre Phase I Cooling
Pond, Florida Power Corporation Hines Energy Complex, Polk
County, Florida (1994 - 1998). Managed geotechnical field investigatjon
programs and cngineering analysis [or thc development of a 720 Ac
cooling pond and 310 Ac plant site area [or Phase 1 1000 M\V capacity of
a 3000 MW power generating facility. Provided desit,>n input to the Plant
Certification Application. Overviewcd the dcvelopment o[ civil desit,>ns
and specifications and providcd construction phase cnginecring support.
Lcad Consultant For Hydrogeology and Modflow Modeling Studies
for the Lakes Of Sherbrook Commercial And Residential
Developments, Lantana, Florida (1993 - 1995). Directed model
developmcn t and analysis and DEP permitting [or cons truction phase
dewatering o[ the infrastructure adjacent to the old unlincd Lantana
landfill. Directed construction phasc WQ sampling to vcrify compliance
of no impact on groundwater contamination plumes beneath the landfill.
Lcad Consultant For Hydrogeology And Modflow Modeling
Studies V.A. Medical Center, West Palm Beach FI (1994 - 1998),
Dirccted Hydrogeology and Modflow Modeling studies, contamination
assessments and prcpared remediation plans for site dewatering,
permittjng and contamination remediation. Directed construction phase
\VQ sampling to verify compliance of no impact on groundwater
contamination plumes beneath the landfill.
Representative WaterlWastewater Proiects
c
Lead Geotechnical Consultant, Lake Boynton Estates, City of
Boynton Beach, FI, 2009). Directed geotechnical field investigation
programs and engineering analysis to provide geotechnical design input
for the Estates watermain system improvements.
URS
Thomas F. Mullin, PE (cont'd.)
c
Lead Geotechnical Consultant, Watermain System Upgrade, Town
of Palm Beach FI, 2001). Directed geotechnical field investigation
programs and engineering analysis for the geotechnical design of the
Towns watermain system. Geotechnical design work included two(2) long
directionally drill pipelines beneath the ICY'(1W.
Lead Geotechnical Consultant for the Hovensa Refinery WWTP,
Expansion, St. Croix, USVI (2006). Directed geotechnical field
investigation programs and engineering analysis for the foundation design
and construction development of the project. Provided construction
phase engineering support for QCQM services related to foundation
improvements and installation, site earthworks construction and pile load
test1l1g programs.
Project Geotechnical Consultant for the Southern Region WWTP,
Palm Beach County, Florida (1990 - 1992). Directed geotechnical field
investigation programs and engineering analysis for the construction
development of the project. Provided construction phase QCQM services
related to foundation improvements and construction, civil earthworks,
pile load testing and installation and surcharging programs.
c
Lead Geotechnical Consultant, D-12 Pump Station and Stormwater
System Improvements, Town of Palm Beach FI, (2000 -2001).
Directed geotechnical field investigation programs and engineering
analysis for the geotechnical design of the Towns new 1)-12 Pump Station
and related stormwater system upgrades.
Power Plants/Heavy Industrial Projects
Foundation designs for spread footings and driven piling for the Hess
Oil FCC Refinery Expansion and LPG Storage Tank in St. Croix,
U.S. Virgin Islands.
Principal geotechnical consultant for the preliminary design of the Coke
Processing/Handling Expansion Project, Hess Oil Refinery, U.S.
Virgin Islands
Lead investigator for extensive geotechnical studies for the 3,000 acre,
3,000 MW, FPC Hines Energy Electric Generating Station.
Investigated 25 + miles of dams, 8 clay setting areas and 4 mined areas for
development into a power plant generating station and cooling reservoir
areas, Polk County Florida. Developed site earthwork, dewatering, soil
cement and earthwork testing specifications.
Project Consultant for geotechnical analysis and reporting for the
Arcadian Ammonia Plant #4, Point Lisas, Trinidad.
c
Directed and evaluated Quality Control Inspection and Testing of
Augered Pressure Grouted Piles and Synthetic Liners/Methane Collection
z
o
~
<(
0::
l-
V)
Z
~
C
<(
Z
o
~
u
~
0::
l-
V)
Z
o
u
........
...J
<(
U
Z
:I:
U
w
I-
o
w
(!)
(!)
z
c
~
...J
U
Z
V)'
w
U
:;
0::
w
V)
Z
o
~
u
w
c..
V)
Z
...J
<(
u
w
c..
V)
0::
o
u..
I-
0::
<(
:I:
U
Z
o
~
<(
!::::!
z
<(
(!)
0::
o
I-
U
w
-.
o
0::
c..
V)
0::
~
c
:t:
U
~
'"
'" ::.
'" ..
'" c
... ..
!!!:;
>
z ~
Z "e-
~o..
u.. >
00
i::
o
..
..
..
:; :;
:;u
0.. ~ U
~.~ g
u~~
~~~
:::1:;:2
u"
......
:;0
0..
::J 1
u
>0::
o::w
wW'"
~U')<Cl.I.I
a::..,za.
< z < .
Q. ::E: - c:
ou"',
8~~~~
~~~~~
=>05a..g
~~Qt:
o..uz
w w
....'"
8
'"
0::
w
'"
<
z
<
:;
Zw
a.Qa.
gg,g
U 0:: 0
"'....0..
'" '" ..
:::I Z ~
oQ
u
....
b
w
a
0::
0..
0::
w
'"
<
z
<
:;
:: ~ .!a
o Z i;
u~~
~::J=
:::I~'"
~
<i
:;)
o
-
w
0..
,;:
~
~
~
."
~
Z
~
...........
U
u'"
ztj
;:>
:2ffi
W"'..
E~:6
~ - ..
~Ei~
:: ~ .s
<<....
~a:
....w
ffi~
>:;
'"
z
ffi
w
zw
~G~
o~=
u~:;
",<:;
'" ~ E
:::I Z 0
~~
....
o
t:l
u
~~
"'....w
<"'0..
~t~
:;) '" "
0"''''
'" z 0
>ir"C
-I 0 ~
<Ca::l~
~...J<(
....-
0::0
w'"
>
'"
z
12
Ww
Wo..
~~~
8~~
"'....."
~~~
b .5
:;)~
0::
....
'"
'"
z
o
~ w
o..wo..
'" 0.. .
~ ~ ~ ~
o <C .)It .~
uQ"'..o
"'~~~
a::ll"lz-a
:::I <i .5 1
'" ~ "
t 0:
:;)
0::
....
'"
'"
z
a:W'
w'"
uz::!
.E G:S:
::JZ:;
cWo..
~ 5:::i'
u _ c
0:: ..
.....c
~u
w
ffi
0::
....
z'"
Qz
....-
<....
Q.c~1Il
a:z~GJ
o~........s
uOU"l....
u..z-
~ollQ?:
:::I<it;~
UW
-0..
z'"
:::z
~-
....
o
w
'"
'"
z
ffi
z~
c.. t; ..
~~;
~....~
a::5~
::>~~
:::
u
~
:s:~
w .
> ..
w c
Q.a::~
'" Z ~
o..,~
u - -
V'l~~
"'o.c
::>~~
o ..
- ~
0:: ~
"'~
'"
z
!5
:;)w
"'0..
Z .
0.. 0 E
'" u ..
OZ~
U Q E
'" .... c
'" < ..
:::I.....c
0::'"
o .-
e:;~
z
~
....
'"
z
i:
~1!
Q, w ..
'" 0.. C
0.... c
U < ..
~~~
:J ~ .~
z'"
o
0::
>
~
~~
Q, 0:: .
",w"O
8~~
fJ')~O
~~~
2:=
u
~ :
0.. g ~
'" w "
0:::0
U u "
","'0
~~J!
~ ..
0-
f~
J
URS
Thomas F. Mullin PE (cont'd.)
,-
\.,..
Systems for structures at the North Broward Resource Recovery
Facility, Broward Co., Fl.
Directed and evaluated dynamic compaction of soft ground conditions
and augercast pile load testing and installation for the Southern Region
Wastewater Treatment Plant, Palm Beach County, Florida.
Site regional foundation screening analysis for siting an 800 MW coal
fire power plant for several locations in Florida.
Directed and evaluated pile load testing programs for the South Broward
County, Resource Recovery Facilities, Broward County, Florida.
Principal Investigator for the 132 kV Powerline onJohn F. Kennedy
Boulevard, New Providence Island, Bahamas
Principal geotechnical Consultant for the Diesel Generator Power Plant
Expansion project, Freeport, Crand Bahamas.
,..-
Project Engineer for engineering, analysis, design, and drawing and
specification preparation for Project Firefly, U.S.A.F. Test Facility,
Lakehurst, New Jersey. Foundation design included a 40-foot deep pit in
sands without dewatering utilizing slurry diaphragm walls with tiebacks,
state-of-the-art deep soil mixing/jet grouting for seepage cutoff and uplift
anchorage design.
~
High Rise/Commercial Development Projects - South Florida
Foundation engineering for numerous high rise stl"uctures and commercial
developments in Florida. Directed subsurface explorations, engineering
analysis, consultation, recommendations for foundation design and
construction and foundation constl"uctioninstallation inspection. Example
projects include the following major high rise structures in South Florida,
Dade and Broward Counties:
.-
62 - story 600 Biscayne Tower*
62 - story 900 Biscayne Tower*
54 - story 50 Biscayne Tower*
53 - story Trump Royale Tower
53 - story Trump Palace Tower
52 & 42(2) - story J-Iallendale Beach Club Towers
51 & 42 - story Quantum Towers*
50 - story Acqualina Resort Tower
46 - story Paramount Tower
46 & 35 story 1060 Brickell Towers*
45 - story Porto fino Tower*
45 & 44-story One Miami Towers*
4S - 2S story Pinnacle Towers
44 story La Perla Tower
43 & 33 story Los Olas Riverhouse Towers
42 - story Trump 1,2 & 3 Towers
...,.
URS
Thomas F. Mullin, PE (cont'd.)
~
\....
42 & 31 story Latitudes on the River Towers*
42 & 27 story Ocean II Towers
40 & 35 story ICON Towers*
38,28 & 18 story Hidden Bay Towers
38 story Millenium Tower
37 story Ocean III Tower
37,27 & 17 story Murano @ Porto fino Towers*
36 story Sonesta Beach Hotel
35 story Blue condominium Tower*
34 story Ocean Grande Tower
34 & 22 story Murano Grande Towers*
30-story L'Hermitage Tower
29 story Jackson Tower
Recent Downtown l\1iami area High Rise Towers
Numerous other high rise towers and commercial buildings of smaller
heights
Miscellaneous Specialized Projects
c
Maglev High Speed Rail Project Manager for preliminary foundation
design studies/cost estimate for the proposed 13 mile long, 300 mph
Magnetically Elevated High Speed Train, Orlando, Florida.
Principal Engineer for Geotechnical studies and Finite Element
Settlement Modeling of large 300' High Cells 4 and 5, South Dade
Landfill, Dade County, Florida.
Principal Geotechnical Consultant for the Jackson Memorial Hospital
Expansion. Underpinning of a 4-story building combined with Tangent
Augercast Pile walls provided excavation support for the existing hospital
structure, Miami, FL.
Principal Investigator and Designer for the 1,200 LF Sand Transfer
Directionally Drilled Pipeline, Lake Work Inlet, FL.
Principal Geotechnical Consultant for the Town of Palm Beach Water
Mains Upgrade project. Project included 18 miles of water main
improvement including two (2) directionally drilled pipelines across the
Intracoastal Waterway, at 2,200 LF and 2,900 LF in length.
Principal Geotechnical Consultant for the geotechnical evaluation of the
Implosion Demolition of the 12-story Lake Tower One High Rise
Tower, Ocean Club Development, Key Biscayne, FL.
,.-
~
Principal Geotechnical Consultant for the Kravis Center CEA
Expansion project, excavation design support. Project includes 7, 10
and 20 foot high augercast pile retaining walls for lateral excavation
support adjacent to the Kravis Center.
/"'"
'--"
Areas of Expertise
Program 0 fanagemen t
PnJ]C:'ct 1\ [anage1l1en t
Structural Engineering
Foren"ic 1"~nginclTing
Real J >tate Due Diligence
Tramit Plann1l1g and '-:ngineering
Years of Experience
,-...,
~
\\'ith UZS: .')1 :' \'ear"
"'ith ()thc'!" Finm: 2(, Year"
Education
\la"ter o( I :.ngineerJng. 19k.)
Structural I.:nginccrin!!,
J .oui"iana Slalc l 'ni"cr,ity
Bachelor (,(Science. 19-:1)
(:i"il I ':nginclTing Techn( ,I, >g\
J,'Jorida 1l1tet'llational l'lliy,,!",jt\.
Registration/ Certification
Pro(e"ional J ::ngl1lCC'r
'-Iorid;! P.E. #:1.)111. IlJR.)
Nortb Carolina P.1::. #2(11:1.1. 21)(}(1
South Carolina. P.E. #21-1-.'\.).211111
,--
'-'"
URS
Jim Nadaskay, P.E.
Principal Structural Engineer
Manager, Civil & Structural Engineering
Manager, Real Estate Due Diligence Services
Overview
Jim Nadaskay, P.E., has more than 32 years of structural engineering and
management experience in the planning, design and engineering, and
construction of multi-disciplined, complex projects.
Jim Nadaskay, P.E., combines his technical and management skills to
complete assignments on time and within budget, with a constant
emphasis on quality. I-Ie is responsive and discerning. He identifies
technical and management problems in projects and develops practical,
cost effective, and often innovative solutions. He is able and willing to
make difficult decisions and the "right" decisions.
.Areas of structural engineering expertise include:
· "Classical" and computer-assisted analysis; finite element analysis
· Reinforced concrete
· Precast / prestressed concrete
· Post-tensioned concrete
· Tilt-up concrete walls
· Reinforced and unrein forced concrete masonry
· Structural steel
· Timber
· Shallow and deep foundations
· Retaining walls and bulkheads
· ASCE 7 wind and seismic loadings
· Florida Building Code and its predecessor building codes
Areas of real estate due diligence expertise and experience include:
· Acquisition / divestiture condition assessments
o Property Condition Assessment ("PCA")
o Florida "Condominium Conversion Reports"
· Americans with Disabilities ("ADA") audits
· Environmental Site I\ssessment ("ESA"), asbestos sU1";eys, and
indoor air quality assessments
· Construction monitoring
· Third party peer reviews or assessment reports
· Miami-Dade County (Florida) 40-year Building Recertifications
Areas of management expertise include:
· Program management
· Project management
· Construction management
· Project Management Oversight ("PMO")
URS
Jim Nadaskay, PE (Cont'd)
c
· Construction scheduling, and claims analysis and investigations
. Contracts and negotiations
· Subconsultant selection and management
· Public presentations
· Project budgeting
Jim Nadaskay, P.E., has a demonstrated ability to communicate effectively
with clients, supervisors and co-workers, subconsultants, and contractors,
particularly using his excellent writing skills.
He is very proficient with computers, including the use of l\1icrosoft
Office suite (\X'ord, Excel, and PowerPoint), Microsoft Project, and
structural engineering software such as RAM ADvanse, 1v\M Concept,
STI'u\D, RISI\ 3-D, and EnerCalc programs, and AutoCAD computer-
aided drafting and design software.
Program and Project Management Experience
,.....
~
· Program Manager for South Florida engineering investigations and
reports to State Farm Insurance. More than 60 investigations and
reports addressing windstorm damage to roofs, floor tile buckling, fire
damage, structural failures, ete. (2007 to present)
· Program Manager / Project Manager in URS' Boca Raton office for
Property Condition I\ssessments and other Real Eseate Due
Diligence services. More the 12,000,000 square feet of buildings has
been addressed in numerous reports. (2005 to present)
· As Director of l:ngineering and Construction for the Tri County
Commuter Rail Authority (Tri-Rail), was directly involved and
responsible in capital improvements totaling more than $120 million,
including the planning, design, and construction of a 1.2-milc
extension of the railroad. The project included constructing new
track and upgrading existing track, installing a new signal system and
upgrading existing signals, rehabilitation of a 70-year-old bascule
bridge over the Miami River to improve reliability, and environmental
remediation of a site for a new station, and design and construction of
a new train station. The project cost was $15M. (1994-1998)
· Deputy Project Director, and then Project Director, for the design,
and design services during construction, of the Brickell Extension of
Miami's Automated People Mover, Miami-Dade County, Florida.
The project included more than 1.1 miles of elevated guideway, \vith a
high-level bridge over the Miami River. \Vas also the structural
Engineer of Record for the six stations, two of which are high level,
8+ story stations on either side of the River. Total project costs were
$250M; the guideway and station project costs on the Brickell
Extension were $39M. The design was fast-tracked and completed
within one year, and was bid $8.31\1 under the original construction
budget. The total project was completed on time and $251\1 under
budget. This was the first time a Federally-funded transit project was
completed under budget. (1989-1994)
r-
\..,
2
URS
Jim Nadaska~ PE (Cont'd)
,-.
"-'
Project Specific Experience
· Hydraulic Structures
o Structural Engineer of Record for the South Florida Water
Management District projects as part of the Comprehensive
Everglades Restoration Project ("CERP"), including
Stormwater Treatment Area 6-2, Stormwater Treatment Area
5-3, and the Compartment C Build-Out. (2005-07)
o Structural Engineer for the Biscayne Bay Coastal Wetlands
Phase I restoration project for the South Florida Water
Management District. (2006-07)
o Structural Engineer of Rccord for the Manatee Protection
Barriers for the S-351, S-352 and S-354 structures in the South
Florida Water Management District. (2006)
o Structural Enginccr of Rccord and design cngineer for water
reclamation pump stations in Goldsboro, North Carolina.
(2001)
· Water and Waste Water Treatment Plants
r-
-..
o Structural Engincer of Record and dcsign engincer for a sludge
belt press building at a wastcwater treatment plant in Mt.
Pleasant, South Carolina. (20()1)
o Structural Ent,tinccr of Record and design engineer for converting
chlorination tanks into a UV disinfection system at a wastewatcr
trcatmcnt plant in Patuxent, Maryland. (2000)
o Othcr projccts include pump stations and foundations for a
trcatment plant in Tampa, Florida, finite clemcnt analysis for
modifications of a steel circular tank in Sarasota, Florida, and
the repair of vibration-damaged 200-hp motor supports for
aeration tank imp ell or at Iron Bridge Treatment Plant in
Orlando, Florida. (1999-2001)
· Seaport Facilities
o Project manager, and structural Engineer of Record and design
engineer for the Terminal 12 building, wharf, and passenger
loading bridges at the Port of Miami. (1988)
o Structural Engineer of Record and design engineer for the
expansion of Terminals 9 and 10, providing access to super
cruise ships, including high-level passenger loading bridges, at the
Port of Miami. (1989)
o Structural engineer for Terminal 1 Wharf at the Port of Miami
(1990).
r'
'....-
o Structural engineer for public wharf and bulkhead, City of
Arlington, Virginia (1999).
3
URS
Jim Nadaska~ PE (Cont'd)
,-
~
· Marine Parks and Waterfront Facilities
o As an engineering consultant to Marineland (Florida), the
world's Erst "oceanarium," recent work has included efforts to
structurally stabilize 63 year old steel tanks and the reconstruction
of concrete bleachers that collapsed during Hurricane Floyd,
subsequent to a structural assessment of 1hrineland's facilities
for a major redevelopment plan. (2001)
o Structural Engineer of Record and design engineer for the Town
of Jupiter, Florida's 1,000-foot Riverwalk along the
Intercoastal \X1aterway. (2001)
o Structural Engineer of Record and design engineer, performing
evaluations and recommending repairs for the seawall at Grove
Isle, Miami, Florida. (2001)
o Design engineer for a barge mooring and off-loading facility on
the Mississippi River near New Orleans, Louisiana. (1983)
· Solid Waste Facilities
/'"'
W
o Structural Engineer of Record and design engineer for several
solid waste transfer facilities, including a recyclable materials
recovery and transfer facility for Browning Ferris Industries
located in Sarasota, Florida. (1992)
o Project manager, structural Engineer of Record, and design
engineer for a metal recycling facility at the Solid Waste
Authority of Palm Beach County, Florida. (1991)
o Structural Engineer of Record and design engineer for the
administration and heavy equipment maintenance building at the
Interim Contingency Landfill, Broward County, Florida.
(1987)
· Transit Facilities and Railroads
",--
o Deputy Project Director, and then Project Director, for the
design, and design services during construction, of the Brickell
Extension of Miami's Automated People Mover, I\1iami-Dade
County, Florida. The project included more than 1.1 miles of
elevated guideway, with a high-level bridge over the 11iami River.
\X1as also the structural Engineer of Record for the six stations,
two of which are high level, 8+ story stations on either side of the
River. Total project costs were $250M; the guideway and station
project costs on the Brickell Extension were $39M. The design
was fast-tracked and completed within one year, and was bid
$8.3M under the original construction budget. The total project
was completed on time and $25M under budget. This was the
Erst time a Federally-funded transit project was completed under
budget. (1989-1994)
'--"
o As part of a team of consultants developing a Major Investment
Study to restore streetcars on Canal Street in New Orleans,
Louisiana, was responsible for advising and developing concepts
4
URS
Jim Nadaska~ PE (Cont'd)
~
'--"
for track work, operations, and maintenance, including an
intermodal facility at New Orleans Union Station. (1993)
o As Director of Engineering and Construction for the Tri County
Commuter Rail Authority (Tri-Rail), was directly involved and
responsible in capital improvements totaling more than $120
million, including the planning, design, and construction of a 1.2-
mile extension of the railroad. The project included constructing
new track and upgrading existing track, installing a new signal
system and upgrading existing signals, rehabilitation of a 70-year-
old bascule bridge over the Miami River to improve reliability,
and environmental remediation of a site for a new station, and
design and construction of a new train station. The project cost
was $15M. (1994-1998)
· Airports
o Project manager and struchlral Engineer of Record for 40-ycar
inspection and recertification of thc enginc test cell facilities at
Miami International Airport. (1999)
,.......
o Projcct managcr and structural cnginecr of record for the
evaluation of Hanger 741, Homestead Air Force Base (AFB),
Homestead, Florida, the largest aircraft service structure at
Homcstead. It was originally design in 1949 for thc maintcnance
of bombers. 1t was severely damaged by Hurricane Andrcw. As
part of the Homcstcad APB realignment, managed the structural
evaluation of thc hangar to mcet currcnt building codcs,
particularly, wind loading provisions, and developed
recommcndations for the strengthcning of the hangar. Evaluatcd
the hangar floor slab and concrete apron pavements for various
types of aircraft loadings. (1994)
~
o Structural engincer for the evaluation of airport terminals and
design of beacon towers, for the Key West and Marathon
Airports, Monroe County, Florida.
· Toll Road Facilities
,,-
'--'
o Rcsponsible for the structural review of toll facilities throughout
the Florida Turnpike system. (1991-1994)
o Project manager and structural Engineer of Record for the
prototype scries of mainline and ramp toll plazas for the
Orlando-Orange County Expressway Authority, Florida,
with the mainline plaza having a tunnel beneath the roadway
travel lanes to access the tollbooth islands and empty toll
collection machines. Ultimately responsible for the subsequent
design of more than six mainline plazas 22 ramp plazas
throughout the OOCEA system, and the review of other
consultants. The mainline and ramp toll plaza design became the
Statewide prototype used on the Florida Turnpike. (1988-1991)
5
URS
Jim Nadaska~ PE (Cont'd)
r'
~
· Industrial Buildings
o Structural design engineer for a reduction tower and warehouse
for a mined rock salt processing and rail car loading facility for
the Cargill Salt Company, Breaux Bridge, Louisiana. (1982)
o Design of numerous warehouses in Golden Glades Industrial
Park and other locations throughout Miami-Dade County.
(1978-1980, 1983-85)
· Municipal Buildings and Parking Garages
o Structural Engineer of Record ("EOR") for the City Hall and
City Commission Chambers for the City of Pompano Beach,
Florida. (1989)
o Structural Engineer of Record for the Administration Building
for the Solid Waste Authority of Palm Beach County,
Florida. (1988)
,-..
I
~
o Structural Engineer of Record for the evaluation and design of
the Emergency Operations Center, Marathon, and the
Government Center Annex, Tavernier, both for Monroe
County, Florida. (1988)
o Structural design enl-:,>1neer for the Parc Auto du Lafayette in
Lafayette, Louisiana, a seven story-parking garage with post-
tensioned concrete slabs and beams, designed as a laterally
unbraced structure, considering all sway and slenderness effects
and the post-tensioning forces, imposed on the frames. (1982)
· Office and Commercial Buildings
o Structural Engineer of Record for Grove Forest Plaza, Coconut
Grove, Florida, a 4-story office building with a below-grade
parking garage. The building was design around the oldest
plantation house in Coconut Grove, to preserve it as a locally
historic structure. A sinkhole discovered on the site during
construction was bridged. (1985)
o Structural design engineer for more than 1.5 million square feet
of shopping center and mall space, including Pompano Outlet
Mall (Festival Flea Market) in Pompano Beach, Florida,
Woodlake Plaza and Kennedy Plaza in West Palm Beach,
Florida, and Boynton Lakes Plaza in Boynton Beach,
Florida, all using tilt-up concrete wall panel construction
techniques. (1983-86)
. Churches
c
o Structural design engineer for the Trinity Cathedral Bell
Tower, Miami, Florida, a reinforced concrete structure meeting
stringent limitations on sway produced by the lateral forces
exerted by ringing the bells. The Bell Tower was reportedly the
first reinforced concrete bell tower in North America designed
around a full peal of 12 bells. (1980)
6
URS
Jim Nadaska~ PE (ContfJ)
,.-
'--"
o Structural design engineer for St. Brendan Catholic Church,
Miami, Florida, St. Catherine Catholic Church, Miami
Lakes, Florida, and St. David Catholic Church, Davie,
Florida. (1978-80)
. Schools
o Forensic structural engineering and expert witness for litigation
by Miami-Dade County Public Schools brought against
contractors over construction defects in Felix Varela High
School, Christina Eve Elementary School, and PLCX. (2006)
o Structural Engineer of Record and design engineer for the 2-story
Temple Kol Ami Day School Addition and Pool Building,
Plantation, Florida. (2003)
o Structural Engineer of Record for Middle Learning Center EE,
for Miami-Dade County Public Schools. (1999)
o General consultant services provided to Miami-Dade County
Public Schools. (1999-2000)
r'
~
o General consultant services provided to School Board of
Broward County, including investigation of roofing and
structural design issues at Silver Lakes Elementary and other
similar schools. (1999-2000)
· Residential and Multi-Residential Buildings
o Structural Engineer of Record and design engineer for numerous
custom homes in Fort Lauderdale, Lighthouse Point, and
other cities in Broward County, Florida. (2003-06)
o Structural Engineer of Record and design engineer for One
Ocean Boulevard in Deerfield Beach, Florida, comprising two
six-story condominium buildings and a pool building. The two
six story buildings were post-tensioned concrete slab floors.
(2003
c
o Structural Engineer of Record and design engineer for Avenue
Lofts Phase I in downtown Fort Lauderdale, Florida, a four-
story loft-style condominium with street level commercial,
designed with concrete frame and masonry bearing walls and
precast concrete, composite poured-in-place floors. (2002)
o Structural Engineer of Record and design engineer for Maison
Matecumbe Condominiums, Upper Matecumbe, Florida
Keys (1985) and Kavala Resorts, Key West, Florida (1983),
designed with three story and four story superstructures,
respectively, with masonry bearing walls and precast concrete,
composite poured-in-place floors. The superstructures were
supported on concrete frames designed to elevate the
superstructures above hurricane surge tides and resist lateral
forces from the tides.
7
URS
Jim Nadaska~ PE (Cont'd)
,--
~
o Structural Engineer of Record and design engineer for numerous
concrete pile and grade beam foundations for private homes in
Cocoplum and Gables by the 5ea in Miami-Dade County,
and Ocean Reef in North Key Largo, Florida. (1978-87)
· Hospitals
o Structural design engineer for Culver Union Regional
Hospital, Crawfordsville, Indiana, a 4-story structure with a
composite steel and concrete floor system subject to seismic
loads. (1983)
,.-
~
o Performed structural analysis for a 7-story addition to 5t, Francis
Medical Center, Monroe, Louisiana, and E.A. Conway
Hospital Monroe, Louisiana. (1983)
· Property Condition Assessments
oURS' Practice Leader in Property Condition Assessments
(PCAs) in Florida, with more than three dozen comprehensive
PCAs performed for various clients and on various building types
over the past 18 months.
o Hotels
· Aruba Renaissance, .Aruba, Netherlands Antilles
· Cancun Hilton, Cancun, Mexico
· The Savoy, Miami Beach, Florida
o Apartments / Condominiums
· Porto Bellagio Condominiums, Sunny Isles, Florida
· Montecito Condominiums, West Pahn Beach, Florida
· Southpoint Place, Jacksonville, Florida
· Serenata Condominiums, Orlando, Florida
o Offices
· 1200 Corporate Place, Boca Raton, Florida
· Glades Twin Plaza, Boca Raton, Florida
o Commercial / \X/arehouses
Riffort Shopping Village, Curacao, Netherlands /\ntiiles
I\ssociated Grocers office / warehouse, Miami, Florida
o Specialized PCA support on curtain wall glazing replacement for
1221 Brickell, a 20-story office building in Miami, Florida,
where more than one third of the glazing was shattered by flying
debris during Hurricane Wilma. (2006)
.
.
r
'--"
o Limited PCA for 1200 Corporate Place, with twin 4-story office
and a clearstory atrium, in Boca Raton, Florida, addressing
indoor air quality, elevator performance, emergency generator
performance, roofing, and glazing replacement following
Hurricane Wilma.
o Project manager for several multi-disciplined teams in preparing
Due Diligence Reports for real estate transactions. Among the
8
URS
Jim Nadaskay, PE (Cont'd)
~
~
reports prepared were Old Hyde Park, Tampa, Florida, a
multiuse retail and residential complex \vith three, 4-story parking
garages, and Esperante, West Palm Beach, Florida, a 30-story
office building with a 7-story parking garage. Notable in both
reports, torsional reinforcement deficiencies were identified in the
exterior spandrel beams in the parking garages, resulting in the
early and excessive cracking of the beams, and then developed
recommendations and procedures for the monitoring of the
beams for continued distress. (1987-94)
r'
'-'"
· Condominium Conversion Reports
URS' Practice Leader in Condominium Conversion Reports
(CCRs), as mandated by Florida Statutes, with more than one dozen
completed for various clients over the past 18 months.
o Serenata Condominiums, Orlando, Florida
o Sian Ocean Residences, Hollywood Beach, Florida
o Sian Yacht Club Residences, Hollywood Beach, Florida
o The Arbours Condominium, Panama City, Florida
· Structural Investigations and Reports
o Embassy Suites Atlanta - Galleria parapet wall crack
investigation and report. (2007)
o \V'ater intrusion investigation of Renaissance III at
Renaissance Park, in Tampa, Florida. (2006)
o Macy's Galleria, Fort Lauderdale, Florida, 2-story loading
dock settlement investigation and report. (2006)
o Investigation of f100r framing displacements at Forest Glen
apartments in Daytona, Florida. (2006)
o Struchlral Engineer of Record for the investigation and report
on corrosion and deterioration of a brick veneered, steel framed
arcade at Sunrise Square, in an upscale Fort Lauderdale,
Florida, shopping center. (2004)
o Investigation of the deterioration of bio-filter walls at a
wastewater treatment plant in Jacksonville, Florida. (2001)
o Developed the structural repair for aerator motor mounting
plates at the Iron Bridge Treatment Plant in Orlando, Florida.
(2001 )
c
o Investigated low strength and frozen concrete for treatment plant
facilities under construction in Patuxent, Maryland. (2001)
· Roofing Inspections and Assessments
o Condition and remaining useful assessment of several school
building roofs at Rosarian Academy, West Palm Beach,
Florida. (2006)
9
URS
Jim Nadaska~ PE (Cont'd)
~
~
o \'{/arehouse / office roof inspections for warranty purpose, and
mechanical equipment tie-downs, at Haverhill Business Park,
Lots 3 - 6, West Palm Beach, Florida. (2006)
o Mechanical equipment tie-downs at Village Shoppes, Lake
Park, Florida. (2006)
· Wind Engineering and Hurricane Damage Assessments
o Project Manager and Principal Structural Engineer for a
Windstorm Vulnerability Assessment of buildings and
facilities for the Town of Davie, Florida. l'vlr. Nadaskay work
included development and programming of a unique "intelligent"
spreadsheet for assessments. (2009; ongoing)
o ~Assessment of two (2) 4-story buildings at the Taino Beach
Resort, located in Freeport, Bahamas, damaged by Hurricane
Wilma in 2005 and the 2004 hurricanes. (2006)
o Following Hurricane Wilma in early 2006, was the Principal
Structural Engineer leading a team of engineers and architects in
the investigation and evaluation of tie down methods used on
manufactured housing (mobile homes) for the Federal
Emergency Management Administration (FEMA).
r
w
o Three days after Hurricane Wilma in 2005, was on a team that
made an emergency site visit to the U,S, Post Office in
Chokoloskee, Florida, to assess damage to the building for the
U. S. Postal Service.
o For two months after Hurricane Andrew in 1992, prepared
assessment reports for insurance claims and other needs on
residential and commercial properties damaged by the storm,
including the Homestead Baseball Complex and the
community buildings at the Villages of Homestead.
. Fire Investigations and Repairs
o Responsible for fire investigations and repairs for several
apartment buildings in Pompano Beach and Margate, in
Broward County, Florida, addressing building officials concerns
about building safety and the application of building codes to
older construction that must comply with new codes. (2003-05)
· Historic Structures
c
o As a consultant to Monroe County, Florida, performed an
evaluation of Truman School, Key West, circa 1915 and 1950;
evaluated and designed an expansion to the Monroe County
Jail, Key West, circa 1850; and performed an evaluation of East
Martello Tower, Key West, a military defense built around
1850, for Federal grant applications. (1987-92)
o Structural Engineer of Record for the evaluation and design for
restoration and improvements to Carysfort Lighthouse, off Key
Largo, Florida, originally built around 1850. (1991)
10
URS
Jim Nadaska~ PE (Cont'd)
.-
~
Professional Societies! Affiliates
· American Society of Civil Engineers
· ASCE Structural Engineering Institute
· National Society of Professional Engineers
· Florida Engincering Society
· .American Concrete Institute
Languages
. English
Publications
/'
~
· "Enhancing Guideway and Station Value on the Brickell Extension of
Miami's People Mover System," A. Jamcs Nadaskay and Glenn F.
Myers, paper prescntcd at the Fourth International Confercnce on
l\utomated People Movers, Dallas, Texas, j\pril 1993.
· "A Review of Diaphrabl1l1 Design for Stcel Roof Dccks," A. James
Nadaskay, Proceedings of the 1985 Annual Meeting of the South
Florida Section ASCE. Prcsented in Miami, Florida, September 26-
27, 1985.
· "Direct Model Test of a Stub-Girder Floor System," Anthony .J.
Nadaskay and C. Dale Buckner, Journal of the Structural Division,
.ASCE, Vol. 111, No. ST7,July 1985, pp. 1504-1516.
· "A Scale Model Test of Stub-Girdcr Systems," A.J. Nadaskay, thesis
presented to Louisiana State Univcrsity, in May 1983, in partial
fulfillment of the requircments for the degree of Master of
Engineering, in the Department of Civil Engineering.
/"'
~
11
URS
Jim Nadaskay, PE (Cont'd)
c
Chronology
· 3/05 to Present
URS Corporation
Boca Raton, Florida
· 8/04 to 2/05
Jim Nadaskay, P.E., Consulting Structural Engineer
Coconut Creek, Florida
. 8/01 to 8/04
Falkanger, Snyder, Martineau & Yates, .Architects & Engineers
Fort Lauderdale, Florida
· 7/01 to 4/99
PBS&J
Miami, Florida
· 5/98 to 4/99
HNTB
l\1iami, Florida
c
. 6/94 to 4/98
Tri-County Commuter Rail Authority
Fort Lauderdale, Florida
· 1/87 to 5/94
Post, Buckley, Schuh & Jernigan, lnc.
Miami, Florida
· 8/84 to 12/86
Thompson Hahs Nadaskay & Associates, lnc.
Miami, Florida
· 6/83 to 8/84
Davis Engineers, P.i\.
l\1iami, Florida
· 6/81 to 5/83
Domingue Szabo & Associates, lnc.
Baton Rouge, Louisiana
· 7/78 to 8/80
Davis Engineers, P.A.
Miami, Florida
Boca Raton I October 4, 2007
c
12
r'
~
c
,-
~
Areas of Expertise
( 1\ 11 InglJll'l'nJl;.'- I "llld
I )l'\ (I, 'j1Il11'1l1 I k";lgll ,lI1d
1\'rtl1lllllll!
Years of Experience
\\ JIll I ]\~: :, 'I l"lr'
\\ llll (lillLT 11rl11< I": 'I ('II"'.
Education
l~~( I ":111111 I ]"rtd,1 ~I.JIl
I III \ l'r, 11 \
I ,1Ihll;1"l'l. I I,
Registration / Certification
":11111 1'1'
":1111:' 1'1
11"nd" (,I 'h
\IIClll!!.'11l :,,,:(,,-
URS
Brett N. Oldford, PE
Senior Civil Engineer/Project Manager
Overview
Brett Oldford has over seventeen years of survey, drafting, planning,
design, permitting, value engineering, and construction inspection
experience covering infrastructure, civil site design and land development
projects. lvir. Oldford's experience includes providing professional
consulting services for both private and municipal sector clients. Serving
as Project Manager, lv1r. Oldford's project list includes large scale
residential, commercial and mixed-use developments, marinas, dredge and
fill projects, water resource, stormwater management system and utility
improvements, roadway projccts, municipal parks and infrastructure
design.
Project Specific Experience
Ocean Grande Pedestrian Underpass, Ponte Vedra, FL
Lcad Enginecr for a 100 foot concrcte underpass travcrsing A-1-A that
served as the main pcdestrian access point to the Atlantic Ocean from the
Occan Grandc development.
Marriott Ocean Pointe Phase 5, Palm Beach Shores, FL
Project Managcr/Lead Engineer for a multi-phased high-rise
condominium developmcnt on the shores of the Atlantic Ocean.
Lake Boynton Estates Utility Improvements, Boynton Beach, FL
Projcct Manager watermain, sanitary scwer and drainage improvements
along 3 miles of roadway in a 200 unit, 80 acre subdivision. Contraints
during design included maintaining continuous utility service the
homeowners during construction. The utility improvements included
planning, design, permitting, bid assistance and construction phase
serviccs for the City of Boynton Beach Utility Department.
River Club Park of Commerce, Bradenton, FL
Project Manager for a 500 unit residential and 125,000 sf professional
office mixed use development located on 165 acres in Manatee County,
FL. The project involved design and permitting through state regulatory
agencies including FDOT, FDEP, SWF\'(1NID and Manatee County.
Emerald Field, Hudson, FL
Project Manager for the planning, design, permitting and construction of
a 324-unit residential development located on 60 acres in Pasco County.
FL. Innovative design enabled a balanced earthwork design on a site
located at the low end of a closed drainage basin. The site was designed
and permitted within a 6 month permitted to meet client schedule
constra1l1ts.
URS
Brett O/dfard (cantC/.)
/"'
'...,..
Watson Glen, Riverview, FL
Project Manager/Project Coordinator for a 180 unit rcsidential
development located on 60 acres.
Creekside Village East, Superior Township, MI
Project Coordinator/Lead Civil Engineer for a 250 unit single-family
residential development located on 350 acres.
Icon Property Storm Sewer Relocation, Miami Beach, FL
Project Manager/Lcad Engineer for the redesign and relocation of a 72-
inch municipal storm scwcr that outfalls into Biscayne Bay.
Merritt Road Realignment, Superior Township, MI
Project Coordinator/Lead Enginccr for the realignment, expansion and
improvement of two milcs of arterial roadway serving over 5000 newly
constructed residential units.
The Beach Club Hypoluxo, FL
Southport Phase V-B Container Yard, Fort Lauderdale, FL
r'
~
D-12 Stormwater Collection System and Pump Station, Palm Beach,
FL
Vista View Park Expansion, Davie, FL
Project Manager for thc construction administration of a 62 acrc park
expansIOn.
Marriott Ocean Pointe Phase 5, Palm Beach Shores, FL
Construction Observation for the installation of improvements associated
with the construction of a multi-phased high-rise condominium
development on the shores of the Atlantic Ocean.
Plymouth Streetscape Program, Plymouth, MI
Construction Observation for utility relocation, roadway realignment and
beautification of the downtown area in Plymouth, Ml.
,,--
~
2
,-....
~
Areas of Expertise
C:on~trucri.)n 1':l1ginl'l'l"il1g
In~pl'cti, m/R. l;ld\\'a\'1 Bridgl'~
Years of Experience
\\'ilh l'R~: 1-1 Yl';lr~
\\'ith ()rher I :irll1~: I I I Yl';lr~
Education
,.......
~
\ I B \ I ( :, JlIr~l'\\" lrk 11'1. )rida
Inll'rnali.mal l'ni\'lT~Il\
B~/I -:Il'e! rlcal 1-:ngil1l'l'l"ing/l-], lrida
Inll'rnari.m;ll l'nl\'lT~ir\
B~I Ci\'j] '-:ngll1Cl'rlng II-Iorida
111 t lTn a r i, m a I L - n i \'lT~ i r \'
Reg istration I Certification
I ')')(J/Pn Jfl'"i. >11al I :ngil1l'lTl
I-I, )rida #1 II 1.')21 l().')
OTHER
1:J)I-:P/~I')rn1\\'all'r. I-:nl~l'ln and
~l'dill1l'ntati, ll1 (:ol1rrol
~
~
URS
lose R. Polo, PE
Senior Project Engineer
Overview
Mr. Polo has experience as a Senior Project Engineer and Office Engineer
on a diverse range of projects including new highway construction and
bridge projects. Typical projects are described below.
Project Specific Experience
Senior Project Engineer, Bridge of Lions Rehabilitation, FDOT
District Five, St. Augustine, Florida (06/08-Present): An $80 million
historic rehabilitation bridge consisting of: building a new temporary
bridge, rehabilitating the existing bridge, and demolishing the previous
built temporary bridge. The structure for the bascule span includes a
superstructure of steel plate girders with a composite exodermic deck and
a substructure consisting of the existing and modified foundation for the
bascule piers and existing bascule towers which enclose the counterweight
along with the machinery and electrical equipment. The bascule piers are
supported on 96-inch drilled shafts. The superstructure type for the
approach spans arc steel girders and a substructure consisting of cast-in-
place concrete piers supported on a cast-in-place foundation cap with
96-inch diameter drilled shafts. The span length for the bascule span is
95 feet between centerline of bearing and centerline of rack and 115 feet
between the centerline of the basculc piers. The span arrangement for the
west side approach is a fourteen span units consisting of the first five
spans of 30 feet, and the following nine spans of 70 feet adjacent to the
bascule span. The cast side approaches consist of nine span units of 70
feet each. The total length of the bridge is 1545 feet. Work under his
supervision started approximately half way under the rehabilitation
process and consisted of pier construction, steel span assembling and
installation, historical concrete restoration on bascule towers, bascule
machinery fabrication, and installation, roadway construction, drainage,
signalization, lighting, signing and pavement markings.
Senior Project Engineer, Group 93 A, B, & C, FDOT District Five,
Belleview-Ocala, Florida (02/08-6/20/08): A series of 12 projects
(approximately $80 million estimated construction amount) ranging from
new bridge construction, new roadway alignment and construction,
milling and resurfacing, drainage, sod installation, signing and markings,
signalization. \'{fork in conjunction with County and City of Ocala, Utility
Companies, and several different Contractors on some of the projects that
were within the limits of the City of Ocala.
Senior Project Engineer, Hendry County CR 833, Devil's Garden,
Florida (02/08-8/11/08): A rDOT Local Agency Program (LAP)
project with Hendry County. The project consisted on double and triple
box culvert extensions, 2-foot roadway widening in each direction,
URS
Jose R. PO/OI PE (cont'd.)
,,-
~
shoulder re-work, milling and resurfacing, sod and new guardrail
installation, signing and pavement markings.
Senior Project Engineer, West Palm Beach Bridge Deck Clearance
Upgrade on Florida's Turnpike, Palm Beach County, Florida (10/07
-02/08): This bridge jacking project of the ON & OFF SB Ramp at
Okeechobee Blvd. on Florida's Turnpike at tvfP 99 consisted of jacking
the existing steel on/ off Ramp bridge 12 inches for additional clearance
of the vehicular traffic below. Project includes jacking the bridge using
hydraulic jacks roadway, drainage installation, Superpave overbuild and
structural asphalt and FC, sod installation, existing street lighting repair,
and sil:,ming and pavement markings.
c
Senior Project Engineer, Jog Road Partial Interchange at Florida's
Turnpike, Florida's Turnpike Enterprise, Ft. Lauderdale, Florida
(11/05-10/07): This $13 million project consists of the construction of
two new ramps (on and off Sunpass Only ramps) with their respective toll
plaza buildings - one to incorporate to Florida Turnpike (south bound)
from J og Road (cast and west bound) and one to exit the Turnpike from
northbound to Jog Road. The project includes a Mechanically Stabilized
Earth (MSE) wall and extensive sub-t,>rade and earthwork, bridge
construction, Superpave asphalt and friction course, drainage, ponds, a
1000 LF of 13' x 10' box culvert, toll plazas, gantry installation,
landscaping, lighting and signalization systems, and signing and pavement
markings. Somc of the duties include the inspection and monitoring of
underground utilities installation such as electric conduits and lines for
electric power cntries for Sunpass installations, street light lincs and main
powcrs lines for facilities at the toll plaza. The construction of a box
culvert will allow water to flow from the left side of the canal under ramp
A. Also, provided inspection activitics and monitoring of construction
operation to ensurc bridge and roadway construction was in close
conformance to plans and specifications.
c
Project Engineer, Royal Park Bridge Replacement, FDOT District
Four, Palm Beach County, Florida (06/01-10/05): The new $52
million facility consists of a pair of parallel trunnion bascule bridges
constructed in one phase. A four-lane temporary bridge ,vas utilized for
construction staging. The structure for the bascule span includes a
superstructure of steel plate girders with a composite exodermic deck and
a substructure consisting of conventional bascule piers which enclose the
counterweight along with the machinery and electrical equipment. The
bascule piers are supported on 1.22m-diameter drilled shafts. The
superstructure type for the approach spans is a precast concrete segmental
box girder and a substructure consisting of cast-in-place or precast
concrete piers supported on a cast-in-place foundation cap with 1.22m-
diameter drilled shafts. The span length for the bascule span is 56m
between centerline of trunnions and 61m between the centerline of
foundations of the bascule piers. This span arrangement is necessary to
provide the required horizontal clearance of the channel. The span
2
URS
Jose R. Polo, PE (cont'd.)
,...........
~
arrangement for the west side approach is a three span unit consisting of
spans of 39.0m, 36.570m, and 30.543m with the longest span adjacent to
the bascule span. The east side approaches consist of a five span unit with
spans of 39.0m, 36.570m, 31.045m, 25.175m, and I8.738m. The total
length of each bridge is 332.641m. l\fr. Polo began as the Roadway
Project Manager and his duties included inspection of roadways, drainage,
and lighting. He was promoted to Senior Project Engineer and was
assisted with the final estimate package and closing out the job.
Project Engineer, Royal Palm Way, FDOT District Four, Palm
Beach County, Florida (04/03-03/04): Responsible for the
reconstruction and milling and resurfacing of Royal Palm \V'ay in the town
of Palm Beach. Project includes new roadway construction, drainage
system, geogrid placement, composite base, milling and resurfacing,
superpave asphalt, friction course, parking lot, hardscape/landscape,
signalization and signing.
,..-....
W
Project Engineer, Milling and Resurfacing Project (MP 274.2-MP
275.9), Florida's Turnpike Enterprise, Lake County, Florida (03/01-
06/01): Work on this design-build project consisted of milling, cross
slope correction, resurfacing with Supcrpave and Friction Course (FC-5)
and shoulder rework to avoid drop-off conditions.
Office Engineer, 1-95 (Okeechobee Boulevard) Interchange, MK
Centennial, FDOT District Four, Florida (11/97-02/01): Worked in a
joint effort with URS and MK CentCl1nial, Inc. for a FDOT highway and
bridge project. Monitored construction progress; prepared supplemental
agreements, work orders, change orders, monthly progress estimates
reports, and final estimate package following FDOT guidelines; input
material testing reports in CQR; and kept records of all quantity
deviations from original (Juantity using electronic spreadsheets such as
Excel, Lotus, and Expedition Database.
Office Engineer, Lejeune Road Interchange CEI, FDOT District
Six, Miami, Florida (06/95-11/97): Served as Office Engineer for the
construction of new ramps between SR 836 and N\V' 45th Avenue and
the reconstruction of SR 836, LeJ eune Road and the vicinity of the Miami
International Airport. Monitored construction progress, recorded material
quantities, maintained daily records; prepared computerized weekly and
monthly estimates using Lotus software; checked calculations of
computation book and daily construction progress; kept records of all
deviations from original contract quantity; and prepared final estimate
package.
c
3
URS
Jose R. Po/a, PE (cont'd.)
;--.
~
Experience Prior to Joining URSCS
Engineer I, Environmental Study ofI/I (infiltration/ inflow) for
Broward County sewer systems-Districts 1 and 2, Broward County,
Florida (11/94-06/95): Provided inspection of lift stations, wet and dry
wells, sewer systems, concrete pipes, gathering and analyzing collected
information on pressure readings for pumps, incoming flow, hydraulic
heads, and drawdowns.
Engineer's Assistant, Dade County Resurfacing Program, Florida
(05/94-11/94): Assessed conditions of street surface, including asphalt
and striping of Dade County streets. Created reports of asphalt and
detailed striping quantities for future resurfacing.
Highway Field Senior Inspector, FDOT CEI Project for SR 5/US 1
(11/93-05/94): Inspected storm drainage pipe installation and bridge
demolition/ construction.
c
Signalization Field Senior Inspector, Florida Department of
Transportation, Dade County (07/92-11/93): Responsible for
inspection of MOT, pull boxes, conduits, grounding rods, and cabinet
controller and mast arm foundation and installation. Assisted Project
Engineer with weekly reports, ledgers, stock pile materials and
supplemental agreements.
Highway /Bridge Inspector, 1-75 (Alligator AIley Highway from
Fort Lauderdale's Toll Plaza to the First Rest Area, Florida (07/86-
11/87): Provided inspection of clearing/grubbing and demucking of road
construction, and pile handling and installation for a 9-mile long segment
of roadway. 1\lso inspected wood forms, stecllayouts and concrete
pouring and testing on bridge const1lJction.
Hardware/Software Engineer, American Micro, Inc. (04/85-07/86):
Selected, installed and provided troubleshooting of motherboards, disk
drives and accessories for IBM compatible computers. I\lso selected and
installed software packages for IBM and IBM-compatible
n1\Crocomputers.
Engineer's Assistant, Pardo Construction Co. (03/80-05/82):
Provided cost estimates for construction materials for small housing
development construction company. Interacted with company material
suppliers revising purchase orders, invoices and payments. Scheduled
materials and equipment as projected under CPM of project construction.
Languages
Bilingual in English and Spanish
c
Specialized Training
FDOT/ Advance Work Zone Traffic Control
FDOT /Multiline Earthwork
FDOT/Multiline Earthwork-Intermediate
FDOT /CQR Program Training
FDOT/ Concrete Inspection Consultant Series
Traffic Safety in Work Area
4
URS
Jose R. Po/a, PE (cont'd.)
,-....
~
Engineering lvfenu System
FDOT /Traffic Control Plan Design
FDOT /Superpave Training
FDOT /Pile Driving Installation
FDEP /Stormwater, Erosion and Sedimentation Control
Primavera/ CPM Scheduling
Asphalt Inspection Consultant Series
Site Manager
Laboratory Information Management System (LIMS)
c
c
5
,....
~
Areas of Expertise
(:, 'n~ rruni, >!l /':nginl'cring
J n~pccrion/!\, ,ad\\';1\-! Bridgl'~
Po~l-tl'n~l' >I1l'd concrl'rl' ~cg1l1l'ntal
bndgl'~
Prl'c;l~t girder bridgl'~
:>rn,j girder bridgl'~
\'ari, >ll~ tral1~p' 'rtati, '11 ~tructurl'~
c
Years of Experience
\\'ith L'IZ:>: 12 Yl'ar~
\\'ith ()t1ll'r hr11l~: 2 Yl'ar~
Education
BS/Ci\'iJ /':ngiIllTring/I']ond;l Stall'
L 'ninT~il\
Registration / Certification
I (),)()/Profl'~~I' >!lal 1':l1ginl'cr/
I 'l, >rIda #( HI(,( 12,)( I
r'
\..,.
URS
Jesse Richterkessing, PE
Structural Engineer
Overview
Jesse Richterkessing has over 13 years of experience and has focused
specifically in the area of structural design of highway related structures.
His project experience includes design, analysis and inspection of several
post-tensioned concrete segmental bridges, precast girder bridges, steel
girder bridges and other various transportation structures. Mr.
Richterkessing has been involved in highly specialized tasks, like
evaluation of non-destructive testing methods for segmental concrete
bridges, and the design of segmental bridges along with the load rating of
segmental bridges under the LRFR guidelines in the State of Florida. His
knowledge of software programs include BD-2, SAP2000, Leap Bridge
Suite, MDX and FLPier for analysis, j\utoCAD and Mlcrostation for
detailing and the creation of Excel spreadsheets for repetitive calculations.
Mr. Richterkessing related experience includes:
Project Specific Experience
SR 826/ SR 836 Interchange Design-Build-Finance Project, Miami,
(2009-Present). -Senior Structural Reviewer of plans and calculations of
several Categories 1 and 2 bridge structures in final design phase. This is
a fully directional 4-level interchange with over 40 briidge, composed of
prestressed concrete beam, steel plate girder, and segmental bridge
structures.
SR AlA Over Little Mud, Blind and Big Mud Creek Bridge and FPL
Intake and Discharge Bridge Widening, Broward County, FL
(DMJM-Harris, 2005) Structural Engineer under the FDOT District 4
District Wide Consultant Plans Review and Design Contract
responsible for review of the Initial and Final Engineering (including
calculations) submittals of four simple span cast-in-place slab bridges
(including two bridge widening and two bridge modifications) and one
bridge replacement. Existing bridges were widened approximately 7.5 feet
to provide a protected sidewalk at the existing bridges. Bridge over Little
Mud was an 87'-8" single span pres tressed girder bridge supported by pile
ben ts.
US 1 Widening over Canal C-I03 & C-I03N, Miami-Dade County,
FL (DMJM-Harris, 2005) Structural Engineer responsible for review
of Bridge Development Report and 30% plans for the widening of
existing north bound and south bound prestressed sonovoid slab bridges
over Canal C-103 & C-103N under the FDOT District 6 District Wide
General Consultant Contract. Existing 3-span bridges, C-103 & C-
1 03N, consists of 3-21' spans and 20'-28'-20' spans, respectively. The
bridge widenings were from 9'-12' and consisted of a cast-in-place flat
slab bridge doweled into existing deck and extension of the existing bridge
abutments and pile bents.
URS
Jesse Richterkessingj PE (cont'd.)
c
Sawgrass DMS Structure, Broward County, FL. (DMJM-Harris,
2005) Structural Engineer in support of DlvlJM Harris CEI division.
Responsible for the review of the design and drawings of the proposed
DMS span sign structure for the SUNNA V Intelligent Transportation
System on the Sawgrass Expressway.
SR 5 / US 1 Oewfish Creek) Structural Component Submittal for
Ramps A, B, C & D , Miami-Dade/Monroe Counties, FL (2006)
Structural Engineer responsible for technical review of 90% plans and
calculations for the Bridge Ramps A, B, C & D of the Jewfish Creek
Bridge Project under the FDOT District 6 District Wide General
Consultant Contract. Superstructure consisting of simply supported
prestressed slab units and 3 & 4-span continuous (lOS' -2" and 102'-9",
respectively), modified 72" bulb tee girders with a composite cast-in-place
concrete deck. End bent and piers supported by 4S-inch diameter drilled
shaft.
,......
~
1-595 / 1-75 Video Monitoring System Phase II, Broward County,
FL. (DMJM-Harris, 2006) Structural Engineer under the FOOT
District 4 District Wide Consultant Plans Review and Design Contract
responsible for the review of the proposed prestressed concrete and
prestressed concrete spun poles for CCTV /MVDS video monitoring
systems and various span sign structures for OMS signs.
Tri-Rail: New River Bridge, Fort Lauderdale, FL. (DMJM-Harris,
2005) Performed reviews of plans and calculations for Tri-Rail's double
track high level bridge structure over the New River. This was a desit,l11
build project with precast approach spans and steel thru girder main span
supported by reinforced concrete piers and 10' diameter mono-shaft
foundations. The project also consisted of reinforcing poor soils at the
bridge approaches, with Vibrated Concrete Columns and a Load Transfer
Platform, which supported a T-\Vall earth retaining wall system.
Miami-Dade Transit: Miami, FL. (DMJM-Harris, 2007-2008)
Structural Engineer for the Project Management Team supporting Miami-
Dade Transit (MD1) department for the extensions of the Metro-rail
transit system. Structures consisted of precast concrete segmental units
and precast u-beams supported on reinforced concrete substructures.
Responsibilities included plans review of the MIC-Earlington Heights
extension through 60% submittal and the North Corridor at 30%.
Additional work included supporting l'vIDT staff for the coordination and
preparation of the bid package of the MIC-Earlington Heights extension.
,..-
~
1-95 SB Off-Ramp to Lantana Road - Ramp K Widening and
Structure E TRB Retrofit, FDOT District 4 (URS- 2011-Present).
Estimated construction cost: $ 3 M; Design Fee: $ 240,000; Estimated
Completion Date: 2015. Lead Structural Engineer for the 6-span
widening of Ramp K and barrier retrofit of Structure E. The widening
will be done with FIB 45 modified beams for the superstructure. The
substructure will be made of a single hammer-head pier founded on lS"
2
URS
Jesse Richterkessing, PE (cont'd.)
c
sq-in concrete piles. The project also includes about 800 ft. of proprietary
MSE walls and 700 ft. of temporary critical sheet pile wall.
Port of Miami Western Port Blvd Bridge Inspection and Load
Rating, Miami, (2011),-Senior Structural Engineer serving as the lead
inspector for the bridge inspection and performed the load rating analysis
for the existing bridge based on the 2011 Bridge Load Rating Manual.
Port of Miami Rail and Highway Bascule Bridges Inspection and
Assessment, Miami, (2010-2011).-Senior Structural Engineer serving as
the project manager for the inspection and assessment of the existing
bascule bridges. The project was to inspect and assess the existing bascule
bridges and provide a cost to bring the bridges back into service. Tasks
included coordinating all inspection aspects for the bridges for the
different disciplines including electrical, mechanical, underwater,
c
Snake Road Bridge over the L-28-1 Canal, Hendry County, FL.
(DMJM-Harris, 2006) Stmctural Engineer for the rehabilitation of a 3-
span bridge. Bridge was composed of precast panels making up the
superstmcture and pile bents as the substructure. \X1ork included retrofit
of non-standard traffic railings (including guardrail approaches),
rehabilitation of the longitudinal joints between panels and replacement of
expansion joints..
SR 5 JUS 1 South Reconstruction from MP 4.150 to MP 8,733,
Miami-Dade County, FL (DMJM-Harris, 2006) Bridge Engineer for
the proposed 120' span Wild Life Crossing #2 bridge in the controversial
18-Mile Stretch Project. Work included preparation of a Bridge
Development Report studying various stmctural alternatives. Responsible
for preliminary design of the 3-40' span continuous flat slab alternative,
the 120' single span prestressed concrete girder alternative, and the 2-60'
span prestressed concrete girder alternative with continuous CIP deck,
pile abutments and pile bents; and cost estimates for all alternatives.
Red Road Reconstruction Retaining Wall Design, Miami-Dade
County, FL (DMJM-Harris, 2004-05) Bridge Engineer for the design
of multiple steel sheet pile walls along the Red Road accommodating the
widening of roadway and dredging of the adjacent canal. Walls were
designed with a barrier wall on top. Developed Retaining Wall Study and
preliminary design drawings for cantilever sheet pile walls. The method of
design was in LPD using the software CW ALSHT.
FDOT, US 41/SR 45, Pasco County, FL (DMJM-Harris, 2000)
Designed temporary sheet pile walls (100 meters) including braced and
anchored walls, for the removal of existing organic soils.
r
~
Florida Turnpike, Palm Beach County, FL (DMJM-Harris, 1999),
Bridge Engineer for the load rating of four (4) bridges located on the
Florida Turnpike within Palm Beach County. Work included performing
inventory and operating ratings for all superstructures. The bridges
3
URS
Jesse Richterkessin9, PE (cont'd.)
~
'...,.
included three (3) different types of concrete superstructures: Flat Slab,
AASHTO Beams and Reinforced Concrete Tee-Beams.
SW /NW 57th Ave, Miami (DMJM-Harris, 2005). Estimated
Construction cost: $ 1.5 M; Design Fee: $ 150,000; Completion Date:
2008. Milling and resurfacing project for 57th I\ve from SW 8th St to
Perimeter Road. Structural engineer for the barrier retrofit of the bridge
crossing the Tamiami Canal. New traffic railing barrier consisted of
FDOT Vertical Face Retrofit.
Louisiana Department of Transportation (LaDOT): New Benton
Road Railroad Overpass, Bossier City, LA (2006) Structural
Ent,>1neer for a 15 span concrete prestressed girder bridge crossing the
KCS railway. \Vork included design of superstructure which included
design of AASI-ITO Type III and Type IV Beams with spans ranging
from 56' to 112'. Bridge had multiple skewed bents throughout due to
existing site conditions beneath the bridge. Work also included review of
substructure design which was made up of pile bents.
c
Feasibility Study for a Rapid Transportation System. Taisei
Corporation, Japan (DMJM-Harris, 2002-2003), Different types of
bridge structures were considered to carry the loads and the very stringent
deflection requirements for a Magnetic Levitation Train. Optimum
structural types and spans were determined. Superstructures, piers and
foundation systems were designed in order to make cost comparisons. A
nOll-seismic region was considered for the study (Florida).
Bridge 4, Carolina Bays, Myrtle Beach, Sc. (DMJM-Harris, 2000-
2001) Bridge Engineer for design of three span AASHTO girder bridge
supported on reinforced concrete piers and abutments. \Xlork included
design and detailing of superstructure which was designed continuous for
restraining moments, and design and detailing of combined spread
footings at intermediate multi-column bents.
c
Specialized Training
FOOT / Advance Work Zone Traffic Control
FDOT/Multiline Earthwork
FDOT /Multiline Earthwork-Intermediate
FDOT /CQR Program Training
FOOT/Concrete Inspection Consultant Series
Traffic Safety in Work I\rea
Engineering Menu System
FDOT/Traffic Control Plan Design
FDOT /Superpave Training
FOOT/Pile Driving Installation
FOEP /Stormwater, Erosion and Sedimentation Control
Primavera/CPM Scheduling
Asphalt Inspection Consultant Series
Site Manager
4
URS
Jesse Richterkessing, PE (cont~.)
c
Laboratory Information Management System (LIMS)
c
c
5
,.-....
~
Areas of Expertise
Project I\lanagel11cnt
Traffic Engineenng
Traffic Safl'ty
Traffic Planning
,\cce" J\lanagcmclJ[
IJR/II\m
Neighborhood 'fraftic Calnung
Site] mpact Studie,
I\[inor Roalh'a" De,ign
c
Years of Experience
\\'jth LRS: ]3 Ycar5
\\'ith OlhC'r Finn,: 1,1 Year,
Education
I f)SS / I\]S / Cj,'j] j':ngineC'ring-
Tran,portation / \\'e'l \'irgini;\
l 'njycr,ity
1 ')S I / BS / Civil hlginccnng ,/
L'niHT,in' of \\'e,lmin,tcr
(forl11erh' Pol:lcchnic of Ccntral
] .ondun)
Registration / Certification
] <)So / Profe"il >11al Engil1l'lT /
Florida #,1%:2(1
c
URS
Rajendran Shanmugam, PE
Senior Traffic Engineer
Overview
Rajendran. Shanmugam is a Senior Traffic Engineer, and Vice President
responsible for providing traffic engineering selTices for the URS offices
in south Florida area. Mr. Shanmugam has extensive experience in
managing, budgeting, and successfully completing traffic operations and
traffic safety contracts, As a Vice President and manager, he overseas all
aspects of traffic engineering and planning related activities in relation to
any type of transportation projects in the south Florida area. Some of the
recent projects include; ]-95 PD&E Study, Krome Avenue PD&E Study,
Miami Gardens Drive PD&E Study, and several Traffic Operations and
Safety contracts with the FDOT Districts 4 and 6, His experience also
include managing and providing traffic engineering and planning related
services and minor design services to municipalities, such as, Monroe
County, City of Wilton Manors, Town of Davie, City of North Miami
Beach, City of North Miami, and City of Miami.
Prior to joining URS, Mr. Shanmugam worked with Florida Department
of Transportation, District 4 Office, as District Traffic Services Engineer,
Traffic Operations Engineer, and I\ccess Management Engineer. During
his eight-year employment with the District, he was actively involved in
the rule-making process for Access Management Standards for the State
highway system, and had the responsibility of implementing access
management rules and standards in District 4. As the District 4 Traffic
Services Engineer, Mr. Shanmugam managed both the Roadway
Permitting and Access Management Offices,
His technical expertise include signal timing and operational analysis,
signal desib'11 and timing plans, traffic operational improvements, and
roadway signing and marking improvements,
Following is only a selected list of projects that presents Mr.
Shanmugam's vast experience:
Project Specific Experience
1-95 PD&E Study, FDOT, District 4. Project l\fanager for traffic
related tasks of this PD&E Study. Including Data Collection and Data
Development Technical Report, Existing and Future Base Conditions
Technical Analysis, Identifying Interchange Improvements reduce
congestion and improve safety, and Access 1\1anagement,
Krome Avenue PD&E Study, FDOT, District 6. Project Manager for
traffic related tasks of this PD&E Study. Including Data Collection and
Data Development Technical Report, Existing and Future Base
Conditions Technical Analysis, Identifying Intersection and Corridor
Improvements reduce congestion and Improve safety, Access
Management, and public presentations.
URS
Raj Shanmugam, PE (cont'd.)
"
'--"
Miami Gardens Drive PD&E Study, FDOT, District 6, Project
Manager for traffic related tasks of this PD&E Study. Including Data
Collection and Data Development Technical Report, Existing and Future
Base Conditions Technical.Analysis, Identifying Intersection and Corridor
Improvements reduce congestion and improve safety, Access
Management, and public presentations. Also developed NETSHvI analysis
to be presented at the public meetings as visual and analytical tool to
compare and select alternatives.
Districtwide Traffic Operations Studies, FDOT, District 4. Project
Manager for this contract, which evaluates roadway conditions and
recommends improvements as necessary. Types of studies include Signal
\X1arrant Analysis, Speed Data Analysis, Sight Distance Studies, Left Turn
\X1arrant .Analysis, Signing and Marking Plans Development, ete.
Districtwide Traffic Operations Safety Review Study, FDOT,
District 4, Project Manager for this study to reduce crashes on roadways
by developing recommendations for geometric and operational
improvements. Services include traffic data collection, technical studies,
and engineering studies, including conflict analyses and fatal crash
reV1ews.
r
'-'"
Transportation Planning and Engineering Services, Monroe
County, Florida. Project Manager for projects that included the annual
USl Arterial Travel Time and Delay Study for 1994 through 2007;
provided engineering support to county staff by reviewing all traffic
impact reports; responsible for all traffic engineering needs for the county
including representing the county at public meetings, commission
hearings and at quasi-judicial)' settings as an expert witness, support for
revising the transportation-related sections of the County's Land
Development regulations; trip generation rates for land use; reassessment
of the methodology for determining the Level-of-Service on US 1; and
. .
congestlon management ass1stance.
Districtwide Traffic Operations Safety Studies, FDOT, District 6.
Project Manager for this study to reduce crashes on roadways by
developing recommendations for geometric and operational
improvements. Services include traffic data collection, technical studies,
and engineering studies.
Traffic Operation Conceptual Design Studies, FDOT, District 4.
Project Manager responsible for developing operational and safety
improvement studies and 30% design plans.
Traffic Operations Push Button Design, FDOT, District 6. Project
Manager responsible for developing design plans for minor roadway
lmprovements.
c
2
URS
Raj Shanmugam, PE (cont'd)
,-
~
Districtwide Enhancement Contract, FDOT, District 4. Project
J\'Ianager responsible for developing design plans to implement roadway
enhancement improvements (sidewalk, bike lane, landscaping, etc.).
Neighborhood Traffic Studies, North Miami Beach. Project
Manager responsible for developing, evaluating and rccommending
techniques to rcduce neighborhood traffic intrusion for several
neighborhoods in the city.
General Planning Contract, FDOT, District 4. Project Manager for
ISTEA Enhancement Application Review, DRI Application Revicw,
Traffic Monitoring Site Inventory , ZDA TA review and update for
Broward and Palm Beach Counties, and GIS support.
General Planning Contract, FDOT, District 6, Project Managcr for
NE 125th Street/NE 6th Avcnue/\'Vest Dixie Highway Intersection
improvements in North Miami; Task Manager for the transportation
section of the Monroe County Grcenways project; Department appointed
reprcsentative for Monroe County Bicycle Plan Task Team.
c
1-95 Master Plan, FDOT, District 4. Project Manager for Data
Collection and Data Development Technical Report, and Existing and
Future Base Conditions Technical Report.
Dade County MPO. Project Manager for development of TMAs and
TSM improvements; City of North Miami Beach Comprehensivc Plan
Evaluation and Appraisal Report (EAR).
District Traffic Services Engineer, FDOT, District 4. Responsible
for managing permitting and access management offices. The permitting
office is responsible for reviewing and recommending approval! denial of
various engineering projects for work done within the Department Right-
of-\'Vay. The access managemcnt office is responsible for reviewing
roadway improvement plans prepared by various FOOT offices as well as
privately funded projects for conformance to access management
standards; reviewing DRI applications for its impact on state roadways.
Supervised a total of six people in both offices combined.
Traffic Operations Office, FDOT, District 4. Contract Manager in the
area of conceptual design. Managed a consultant contract to develop
safety and operational improvements on state roadways. Presented the
concepts for local elected officials and public for approval and cventually
incorporated into the Department \'Vork Program.
c
Professional Societies! Affiliates
Member ITE International Chapter
Member ITE Florida Chapter
3
c
Areas of Expertise
F ounda tion I::nginecring
Pile Dc:;ign and Comtrunion
Dmamic Pile T es ting
Years of Experience
With l'RS: 11 Years
With Other Finn:;: 7 Year:;
Education
13SCF / 1983 / l'niHTsit\ of
J:!onda
i\lSCL / 1987 / l'nl\Tr:;it\ of
l;!c)rida
c
Reg istration / Certification
J 9S9 / Profc"iona! EnginC'cr /
J:lnricb # -1-1111.:;
100S / .\ch-anccd PD\
Ccrttf1cltir,n / Foundation (~.\
IJ:-;!)VJ r~:\al11inatjon
c
URS
Michael R. Sharp, PE
Senior Geotechnical Engineer
Overview
Mr. Sharp has over 28 years of experience in project management,
foundation design and testing, and preparation of construction
recommendations for roadways, major highway bridges and related
earthwork, buildings and storage tanks, wastewater treatment plants,
pipelines, and earthen dams. Typical projects are described below.
Project Specific Experience
Project Manager, Maitland Boulevard (SR 414) Extension (Project
414-211), Orlando-Orange County Expressway Authority, Orange
County, Florida: Directed dynamic pile testing program for the
extension of Maitland Boulevard a distance of about 1.6 miles to the west
from approximately the Orange/Seminole County line. The project
included single-span bridge structures over a CSX Railroad spur and US
441 as well as an elevated viaduct structure, approximately 2,800 feet long,
that spans Overland Road and a Florida Central Railroad mainline. The
single-span structures and portions of the viaduct were supported by I-IP
14 x 89 steel piles while foundations for the remainder of the viaduct
consisted of 24-inch square, prestressed concrete piles. Results of the
testing were evaluated to develop appropriate production pile lengths and
installation criteria throughout the project.
Project Manager, District Wide Geotechnical Services, FDOT
District Five, Florida: Directed dynamic pile testing programs on
several bridge widening/ replacement projects within the District including
SR 528 over the Indian River, SR 500 over Canal C-57, US 192 over Mill
Slough, SR 520 over Second and Jim Creeks, SR 25 over Lake Palatlakaha
Creek, CR 484 over CSX Railroad, and SR 11 over Little Haw Creek.
Results of the testing were evaluated to develop appropriate production
pile lengths and installation criteria at each st.ructure location. Pile types
included 18-inch, 24-inch, and 30-inch square prestressed concrete piles as
well as 20-inch diameter pipe piles.
Project Manager, District Wide Geotechnical Services, FDOT
District Seven, Florida: Provided foundation design as well as
construction engineering, pile load testing and inspection services, along
with drilled shaft inspection services on roadway and bridge projects
within the District.
Senior Geotechnical Engineer, New Berth 10, Port of Cristobal,
Colon, Republic of Panama: Provided oversight for Panama Ports
Company of Contractor's dynamic pile testing program implemented to
develop foundation installation criteria for piles supporting a new wharf at
the Port of Cristobal. Piles included 28-inch octagonal prestressed
concrete piles, with and without 26-inch diameter pipe pile extensions, as
well as 30-inch diameter, battered pipe piles. Scope of services included
oversight of testing program as well as review and evaluation of testing
data and pile installation criteria.
URS
Michael R. Sharp, PE (cont'd.)
c
Senior Geotechnical Engineer, Advanced Wastewater Treatment
Plant, Hovensa Refinery, St. Croix, USVI: Provided oversight for
Hovensa of Contractor's static and dynamic pile testing program
implemented to develop foundation installation criteria for piles
supporting aeration and clarifying tanks as well as other ancillary
structures included in the construction of an advanced wastewater
treatment plant. Scope of services included oversight of testing program
as well as review and evaluation of testing data and pile installation
cntena.
~
~
Senior Geotechnical Engineer, SR 20 Over Apalachicola River,
FDOT District Three, Calhoun County, Florida: Directed
geotechnical engineering and construction monitoring services during the
construction of an approximately 1.5-mile long, two-lane highway bridge
(SR 20) over the Apalachicola River in north Florida. Foundations for the
structure consisted of pile bents each containing five, 30-inch sCluare
prestressed concrete piles, with 18-inch voids cast the full length of the
pile, as well as drilled shaft piers consisting of two shafts each. Shaft
diameters varied from five to six feet at thc approaches to the river and
from seven to nine feet at the bank and river piers, respectively. The
scope of work included directing and evaluating static and dynamic pile
load test programs, as well as a drilled shaft load test program that
consisted of multi-level Osterberg Cell load testing of fully-instrumented
test shafts along with lateral load testing of an instrumented 9-foot
diameter test shaft. Results of the load testing programs were used to
establish production pile and drilled shaft tip elevations and installation
CrItena.
c
Senior Geotechnical Engineer, Gulfstream Natural Gas, LLC,
Compressor Station 420 - Supplemental Geotechnical Services,
Palmetto, Florida: Directed program of supplemental geotechnical
studies to develop driven pile foundation design and construction
recommendations for various structures and equipment including
compressor units. In addition to field exploration, laboratory testing, and
geotechnical analyses, the project included a dynamic pile testing program
to develop production pile lengths and installation criteria for steel pipe
piles.
Senior Geotechnical Engineer, SR 71 and SR 79 Over Intracoastal
Waterway, FDOT District Three, Gulf and Bay County, Florida:
Conducted geotechnical engineering and construction monitoring services
for the replacement of hvo major highway bridges spanning the
Intracoastal \X1aterway in north Florida. Both projects included
construction of high-fill approach embankments on soft subsoils.
Structure foundations consisted of 18-,24-, and 30-inch, vertical and
inclined, prestressed concrete piles, some of which required compression
and tension load capacities. Scope of work included directing and
evaluating static and dynamic pile load test programs, monitoring and
evaluating approach embankment geotechnical instrumentation, and
preparation of recommendations for pile foundation installation and
approach embankment construction.
2
URS
Michael R. Sharp, PE (cont'd.)
~
~
Geotechnical Engineer, US Navy Homeports, Mississippi and
Alabama: Evaluated static and dynamic pile load tests to develop
production pile driving criteria for U.S. Navy Homeports in Pascagoula,
lYIississippi, and Mobile, Alabama. Project included onshore and offshore
piles.
FDOT District One Soils & Foundations Section, Florida: Obtained
experience in FDOT Soils & F ounda tions Section preparing and/ or
assisting in the preparation of engineering reports for use in the design of
structure foundations and associated earthwork.
Professional Societies/Affiliates
American Society of Engineers
Publications
Hussein, M., Sharp, M., and Knight, W., "The Use of Superposition for
Evaluating Pile Capacity," published in the proceedings of the
International Deep Foundations Congress, February, 2002, Orlando,
Florida, USA
,..
~
Sharp, M.,.Jory, B., Knight, W., and Hussein, M., "Installation of High
Capacity Driven Piles in Coastal Northern Florida," published in the
proceedings of the U.S. Federall-lighway Administration (FHWA)
International Conference on Design and Construction of Deep
Foundations, December, 1994, Orlando, Florida, USA.
Hussein, M.,.Jory, B., and Sharp, M., "Compression and Uplift Capacity of
Driven Concrete Piles," published in the proceedings of the Fifth
International Conference on Piling and Deep Foundations,.J une 13-15,
1994, Bruges, Belgium.
Sharp, M., McVay, M., Townsend, F., and Basnett, C, "Evaluation of Pile
Capacity From Insitu Tests," published in Geotechnical Special
Publication No. 17 Soil Properties Evaluation From Centrifugal Models
and Field Performance, 1988. Presented at ASCE National Convention,
Spring 1988.
,-.
~
3
,,--
~
Areas of Expertise
r
w
H.e~oh-ing Enyironmcntal
Rcgulaton' 1~~ues, I\Iarinc and
Terreqrial Habitat ,-\ssessmel1ls ,1I1d
Impact .-\nah's('~, Natural
Community l\Iapping. \'\etland
Delinea tions / Functiona]
.\sseooments. Protected ],']oral and
Faunal Species .\ ~~essmelH~,
Offshore and Nearshore Benthic
Resuurce ,\ssessmelHs, Fsscntial
h~h Habitat .-\sscs~lHenr~, ~ectlon 7
Consultation, Protected Spccie~
Permitting and Relocatiun~.
Federal/State /I.oGtl . \genc\
!':n,'ironmenta] Res(lurce
Pcrmirting, Secundan' and
CUl11ulatin' 1mpacl ,\nah~('s.
l\Iarine & !'resh\\'ater \\'c't!and
\Iitigation Planning and De~ig!1.
l\Iitigalion Conslrucljo!1 On'r~ight
and l\ Ie miluring, Specie~
CO!1sernltion l\leasures,
Fm'ironll1l'nlal Permit Cumpliance.
I':rosion Control. N j.:P. \ Studies
(C\TEX. E.\, l!lS. PD&F-:, etc.).
Cons tructiull Feasibilin' Studies,
Protected Land l\fanagCl11el1l Plan~,
De~ign Plan Reyic\\'s, l\[alerial
ReC\cling/Solid \\a~te hcdin'
Permitting, \\ 'ater Quali n'
,\ ssessments and Contamina tion
,\ sse~~ments
Years of Experience
\\ith UZS: 111 Year~
\\'ith Other hrl11~: '7 Years
Education
c
Craduate Srudil's 19<J-l-- 19%.
Coastal !.one !\lgl11t./l\Ianne
Biolog:'.:\:Sl' Oceanographic
Center
B.S, Degree 19<) I, BiologICal
Scil'nces. SL'N'y' at StOll\' Brook
URS
Keith Stannard
Environmental Project Manager
Overview
!vir. Stannard has over 17 years of experience in conducting and managing
professional ecological investigations required for environmental
assessment of a wide variety of public and private sector projects
including linear facilities (roadways, railways, pipelines), site development
(industrial, residential, mixed-use) and special-purpose projects (offshore
facilities, marinas, dams, maintenance dredging, basin studies, etc.). He
has an in-depth knowledge of federal, state and local environmental
regulatory criteria and associated agency procedures in relation to NEP A
and environmental resource permitting. He also has extensive experience
with marine and terrestrial wetland ecology; wetland mitigation;
threatened and endangered species conservation protocols and Section 7
consultation.
Project Specific Experience
Lead Biologist, Cape Sable Canals Dam Restoration Project,
Everglades National Park, National Park Service (2008-Present):
Lead biologist responsible for preparation of an Environmental
Assessment (EA) [or the restoration of two breached dams in Cape Sable,
ENP. Tasks include NPS/ENP internal scoping, public and agency
scoping/ consultation, data collection, data analysis, preparation of the EA
and FONSI.
Project Manager, Tamiami Trail Vista Clearing Mitigation
Feasibility Study, FDOT, District VI and Everglades National
Park/National Park Service (2008): Conducted a mitigation feasibility
analysis to determine the potential benefit of utilizing the NPS-planned
lO-mile vista clearing project as mitigation to compensate for a portion of
the proposed freshwater wetland impacts associated with the FDOT's
Krome Avenue widening project.
Project Manager, Compressor Station Contamination Assessments,
Phase VIII Expansion, Florida Gas Transmission (2008-Present):
Project Manager responsible to conduct Phase I contamination
assessments and title searches for the proposed expansion of four existing
compressor stations (CS 11-14) and one new compressor station (CS 29)
associated with the Phase vnl Expansion program.
Project Manager, Hydrogeologic Study-Archbold Biological Station,
Greenfield #3 Lateral, Phase VIII Expansion, Florida Gas
Transmission (200S-Present): Project Manager responsible to conduct
a hydrogeologic investigation to model potential impacts to the flow of
groundwater between Lake Annie (Archbold Biological Station) and Lake
Placid as a result of constructing a new pipeline lateral between the two
lakes just north o[ SR 70 in the Lake Wales Ridge area.
URS
Keith Stannarct (cont'd.)
c
~
~
Project Manager, Southwest 344th Street/Palm Drive Park and Ride
Facility, Florida City, Miami-Dade Transit (2008-Present): Project
Manager responsible for preparation of an Environmental Assessment
(EA) for the development of a Park and Ride facility in Florida City.
Tasks include project scoping, public involvement, data collection,
alternatives analysis, preparation of the EA and FONS!.
Project Manager, Northwest 114th Avenue Improvements (Tract
34), City of Doral Public Works (2008): Applied for and obtained
Federal, State and County environmental resource permits for the
construction N\X1 114th f\venue through a lO-acre freshwater wetland.
Tasks included wetland delineations, UI'vL\lvf functional assessments,
wildlife surveys, agency coordination, contamination reviews, and wetland
mi tiga tion planning.
Project Manager, Passive Recreational Areas Feasibility Study
(2008): Responsible for conducting an Environmental Feasibility Review
to evaluate the potential "red flags" or fatal flaws associated with the
planned use of two large tract wetland mitigation areas as potential passive
recreational parks for the City of Doral.
Project Manager, 6-inch Miami Beach Lateral Biscayne Bay,
Miami-Dade County, Florida Gas Transmission Company (2006-
Present): Project Manager responsible for environmental-related tasks
associated with the placement of concrete mats on 10 exposed segments
of existing submerged pipe (segment length varies up to 600 linear feet)
located in the Biscayne Bay Aquatic Preserve which is also classified as an
Outstanding Florida \X1ater. Tasks include coordinating and conducting
an intensive 14-day underwater benthic resources/seagrasses survey using
SCUBA and surface support personnel to identify, assess and map (in GIS
and AutoCad) marine benthic resources within 65 feet perpendicular to
each exposed segment due to the size of the vessel laying the concrete
pads and potential impact from scour. Results of the survey will be used
to apply for federal, state and local agency permits and provide suitable
mitigation for proposed impacts due to construction activities. Additional
tasks include regulatory agency coordination (FDEP, USACE, NMFS and
DERM), environmental resource permitting, resolving sovereign
submerged lands issues, preparation of Essential Fish Habitat Assessment
and a marine species Biological Assessment, development of a mitigation
plan including restoration of prop scars within FDEP's Biscayne Bay
Aquatic Preserve, coordination with mitigation contractors and assisting
with bid documents.
c
Project Manager, District-wide Misc. Permitting Services
Consultant (Contracts C-7724 and C-8I41), FDOT, District VI, $3
million, (2001-Present): URS was a\varded two $1.5 million contracts to
manage and direct environmental permitting activities and other
environmental-related studies for various large and small-scale FDOT
roadway improvement, new roadway, bridge replacement/improvement,
boat ramp restoration and tunnel projects throughout Mami-Dade and
Monroe Counties in Florida. Tasks include conducting Seagrass/benthic
resource surveys, marine and freshwater wetland assessments and
URS
KeIth Stannard, (cantC/.)
c
delineations, upland assessments, protected plant and w'ildlife surveys and
assessments, Federal/State/County agency coordination, environmental
resource permitting, stormwater management permitting, Class V Deep
\X1ell permitting, obtaining sovereign submerged lands casements, GIS
mapping, wetland and T&E species mitigation planning and design,
permit tracking, erosion control, engineering plan reviews, dewatering
permitting, water quality assessments, NEPA studies/re-evaluations, in-
house technical and administrative assistance, Essential Fish Habitat
assessments, and protected plant and wildlife biological
surveys / assessments.
,,-
~
Project Manager, 12-inch St. Petersburg Lateral, Pinellas County,
Florida Gas Transmission Company (200S-Present): Project Manager
for environmental tasks associated with the relocation of a 2.5-mile
section of pipeline including a new subaqueous crossing of Allen Creek
and adjacent coastal wetlands in Clearwater, Florida. Tasks include
conducting a wetlands/surface water assessment, contamination review,
regulatory agency coordination (FDEP and USACE), environmental
resource permitting (including applying for and obtaining a sovereign
submerged lands easement), and preparation of an Environmental
Assessment (EA) for submittal to FERC.
Environmental Task Leader, Florida Panther Prey Survey for the
Everglades Agricultural Area (EAA) Conveyance and Regional
Treatment (ECART), EAA Compartment Band EAA Compartment
C Projects of the Comprehensive Everglades Restoration Program
(CERP), Palm Beach County (200S-Present): Responsible to organize
and conduct extensive panther prey (deer and feral hog) track surveys and
reporting for approx. 16,000 acres in western Palm Bcach County in
accordance with U.S. Fish and \X1ildlife guidelines in connection with thc
U.S. Army Corps of Enginccrs (USACE) 404 permit application.
Environmental Task Manager, Collier County Naples Landfill
Feasibility Study (200S-Present): Responsible for conducting an
E.nvironmcntal Permitting Feasibility Rcview to evaluate the potential
"red flags" or fatal flaws associated with the planned expansion of the
Naples Landfill into potentially jurisdictional wetland areas (defined as
preserves) as it pertains to Federal, State and County wetland regulations.
Lead Biologist, Villa Dolce Residence, Miami, Portofino Homes
(200S-Present): Responsible for the preparation and submittal of
environmental resource permit applications for the construction of a large
residential home in protected coastal wetlands. Tasks include the design
of an on site coastal wetlands mitigation plan, EQCB application variance
and hearing, and the preparation of conservation easement documents.
Environmental Task Manager, Blue Heron Development, City of
Doral, Miami-Dade County, Florida (2007-Present): Task Manager
responsible for applying for and obtaining environmental and drainage
permits from federal, state and local agencies. Tasks include the
performance of a wetland delineation and assessment, applying for
federal, state and local agency environmental permits and mitigation
planning through a local mitigation bank.
c
URS
KeIth Stannard, (cantC/.)
c
Environmental Task Manager, 1-75 from Miami-Dade County Line
to SR 826 (Palmetto Expressway), Miami-Dade County, PD&E
Study, FDOT, District VI (2007-Present): J\lanage and direct
environmental tasks associatcd with the performance of a PD&E Study.
Tasks include preparation of a \\1etlands Evaluation Report, Endangered
Species Biological Assessment, Contamination Screening Evaluation
Report, Noise Study Report, Air Quality Report, 4(f) Determination of
Applicability, and an Environmental 1\ssessment/Finding of No
Significant Impact (EA/FONSI) for submittal to FHW A (including
public involvement) for proposed roadway improvement and alignment
alternatives.
c
Environmental Task Manager, U.S. Army National Guard
Readiness Training Center (30-acre site) and Miramar Snake Creek
Development (100-acre site), City of Miramar (2007-Present): Task
Manager responsible for applying for and obtaining environmental, right-
of-way and drainage permits from federal, state and local agencies. Tasks
include the performance of a wetland delineation and asscssment
(including soil and hydrological analysis), and applying for federal, statc
and county agency environmental permits. Future tasks will includc
onsite wetland mitigation design, construction oversight, and monitoring.
Environmental Task Leader, Broward County Aviation Department
(BCAD), Fort Lauderdale-Hollywood International Airport
Expansion Program (2007-Present): Responsible to assist the Airport
Expansion Program team and BCAD with ecological-related tasks
including wetland mitigation construction and exotic species control
oversight, thrcatened and cndangered wildlifc surveys and permitting
(including burrowing owl relocations) and environmental permit
compliancc activities. I n addition, responsible for the performance of fivc
years of quarterly mitigation monitoring and maintenance activitics
(includes contractor management and oversight) to ensurc compliance
with Federal, State and County environmental permits.
Environmental Task Leader, FDOT, District IV, County Road 609
PACE Study, Martin, St. Lucie and Indian River Counties (2007-
Present): Responsibilities include the performance of environmental
services in support of Multimodal Planning and Conceptual Engineering
(PACE) studies for the dcvelopment of an appropriate corridor concept
for the construction/connection of County Road 609 through Martin, St.
Lucie and Indian River Counties (formerly identified as Citrus Highway).
Tasks include extensive GIS-based analysis, ground-truthing and technical
report writing in relation to potential environmental and social impact
Issues.
c
Project Manager, Final Design Noise Analysis, N.W. 74th Street
Interchange at Florida's Turnpike, Miami (2007-Present): Managed
environmental tasks associated with conducting a noise modeling and
analysis for the final design of the proposed interchange resulting in the
construction of noise walls as approved abatement measures. Tasks
URS
Keith Stannard, (contC/.)
c
include extensive coordination with the design team and relevant
homeO\vners associations.
r'
~
Environmental Task Manager, Biscayne Landing Development,
City of North Miami (2007-Present): Task Manager responsible for the
development's long-term wetland mitigation monitoring program for
several wetland mitigation areas ranging from approximately 30 acres to
less than 1 acre in size. Tasks include environmental permit compliance
tracking, mitigation maintenance contractor oversight, and applying for
environmental/ drainage design permits/mods. from Federal, State and
County agencies for various development improvements (including
adjacent roadways).
Environmental Task Manager, Lucy Street Interchange at Florida's
Turnpike, Miami, State Environmental Impact Report (SEIR),
FDOT Florida's Turnpike Enterprise (2007-Present): Managing
environmental tasks associated with the performance of a SEIR (privately
funded). Tasks include preparation of a WER, ESBA, CSER, NSR, AQR
and a SEIR for submittal to FH\,:(!A (including public involvement) for
proposed interchange improvement alternativcs.
Environmental Task Leader, City of North Miami Beach - Phase
IV (2006-Present): Responsible for applying for and obtaining
environmental resource, stormwater management, and right-of-way
permits for misccllaneous City-wide drainage improvements.
Environmental Studies Task Manager, Misc. District-wide PD&E
Contract, FDOT, District IV (2004-Present): Task Manager for
environmental studies associated with miscellaneous PD&E projects
throughout Broward, Palm Beach, Martin, St. Lucie and southern Indian
River Counties. Tasks include the performance of PD&E Re-evaluations,
benthic survcys (incl. oyster beds), agency coordination, contamination
assessments, wetland evaluations, EFI-l assessments, scrub-jay and gopher
tortoise surveys, wetland mitigation, value-engineering workshops and
preparation of Wetland Evaluation Reports, Endangered Species
Biological Assessments, and Contamination Screening Evaluation
Reports. Recent assignments include SR 707 (Martin County) and SR 70
(St. Lucie County) PD&E projects, the latter being the first PD&E study
in ~istrict IV carried out under the E'lDM Program.
Environmental Task Manager, Krome Avenue South PD&E Study,
FDOT, District VI (2004-Present): Task l\1anager for environmental
tasks associated with the preparation of an Environmental Impact
Statement (EIS) associated with the performance of a PD&E Study to
analyze proposed roadway alignment alternatives for Krome Avenue from
SW 296th Street to SW 136th Street. Tasks include data collection,
impact analyses, public involvement, agency coordination, preparation of
a \\1ER, ESBA, CSER, NSR, AQR, and a Farmlands Analysis. Extensive
coordination was conducted with the Miami-Dade County
Environmentally Endangered Lands (EEL) Program regarding potential
impacts to protected lands (Owaissa Bauer Addition No.1) and critically
imperiled plant species. The project included preparation of a OEIS,
r
~
URS
Keith Stannard, (contC/.)
c
c
extensive coordination with FH\X' A and preparauon of a FEIS for
submittal to FHW A.
Environmental Permitting Task Manager (Sub-consultant to
Greenehorne & O'Mara), District-wide Misc. Drainage Studies and
Environmental Permitting Consultant, FDOT, District IV (2006-
Present): Manage and direct environmental permitting activities and
other environmental-related studies for various large and small-scale
FDOT roadway and bridge improvement projects throughout Broward,
Palm Beach, Martin, St. Lucie and southern Indian River Counties in
Florida.
Project Manager, Calypso U.S. Pipeline - Grand Bahama Island,
Bahamas to Port Everglades, Fort Lauderdalc, Florida (2001-
Prescnt): Environmental Task Leader and Project Manager for thc
preliminary design and environmental impact analysis neccssary to apply
for and subsequently modify environmental permits from the USACE,
FDEP and Broward County for the United States portion of a proposed
90-mile pipeline from Grand Bahama Island, Bahamas to Ft. Laudcrdale,
Florida. Thc project included an extensive altcrnatives analysis evaluating
trenching, directional drilling, and hmncling alternatives resulting in an
approximate 3-mile mincd 10-foot diamcter tunnel beneath thc nearshorc
coral reef systems (in place of previously proposed directional drill and
trcnching methods). Tasks also include the preparation of F-l
Environmcntal Documcntation (Rcsource Reports) and applying for and
subsequently modifying the issued CPCN from FERC. 'rasks also
included the performance of wetland and marine benthic resource
surveys/ asscssments (utilizing undcrwater vidco), marine and freshwater
impacts analysis, protected plant and wildlifc and habitat survcys,
mitigation planning and dcsign, coordinating public/agency workshops
and presentations, and long-term coral relocation monitoring associated
with the impacts resulting from the marinc gcotechnical analysis.
Project Manager, City of Doral, Miami-Dade County, Florida (2007-
Present): Project Manager for various environmental-related tasks to be
performed on an as-needcd basis. Tasks include wetland delineations and
assessments, Phase I contamination rcviews, threatened and endangered
species surveys/assessments, development feasibility analysis, and
environmental resource pcrmitting for City improvement projects.
Environmental Task Manager, Amelia Earhart Park, Miami-Dade
County Parks and Recreation (2007): Task Manager responsible for
the performance of a wetland delineation and assessment within the
northern lOG-acre l\lountain Bike Trail area.
c
Project Manager, Compressor Station 22, Miami, Florida Gas
Transmission Company (2004-2007): Project Manager and task leader
for environmental-related tasks associated with FGT's proposed
Compressor Station 22 in Miami, Florida. Tasks include conducting an
ecological assessment and preparing FERC clearance letters to USF\\1S,
DCA and SHPO, stormwater design, regulatory agency coordination,
applying for and obtaining an ERP through the FDEP, IW-5 and Class V
Dewatering permits through Miami-Dade County DERM, EQCB
URS
Keith Stannard, (contC/.)
c
vanance approval through FDEP and EP A, contamination assessment
(phase I and II), installation of ground water monitoring wells, water
quality sampling and analysis of wells, dewatering discharge sampling and
analysis, trench and frac-tank air quality sampling, air sparging dewatering
monitoring, site grading and drainage as-built certifications, engineering
as-built certifications and MOT plans preparation and permitting through
FDOT.
Environmental Task Manager (Sub-consultant to C3TS), US-1
South Design-Build, Miami-Dade and Monroe County, FDOT,
District VI (2006-Present): Task Managcr for environmental-related
tasks associated with the Design/Build of 4 segments of the US-1 South
roadway corridor (l8-mile stretch to the Florida Keys). Tasks include
applying for environmental resource permits/modifications, monitoring
and construction oversight, regulatory agency coordination, rcgular
coordination with FDOT's CEI team, wetland delineations and functional
analysis, wetland mitigation, long-term monitoring, pcrmit compliance,
on-site environmental training of contractors, upland tree survcys,
thrcatened and endangered species assessments, exotic and nuisance
vegetation management, and permit modifications as needed for proposed
roadway improvements.
c
Project Manager, Turkey Point Lateral, Miami, Florida Gas
Transmission Company (2005-2007): Project Manager and task leader
for environmental-related tasks associated with installation and operation
of pig launcher and receivcr facilitics along FCT's existing approximate
18-mile pipeline lateral in Miami, Florida. Tasks include conducting
wetland and T&E species assessments, cultural resource assessments,
preparation of FERC clearance letters to USI"\XIS, DC\ and SHPO,
contamination assessments (phase I) regulatory agency coordination,
applying for and obtaining a Class V Dewatering permit through Miami-
Dade County DERM, trench dewatering discharge sampling and analysis,
MOT plans preparation with a lane closure analysis and permitting
through FDOT. Additional tasks include conducting an environmental
issues review and an issues map using GIS for the entire 18-mile laleral to
preliminarily identify environmental issues prior to conducting the smart
pig test for possible pipeline anomalies due to the requiremcnts of the
USDOT Office of Pipeline Safety, agency coordination, and applying for
after-the-fact permits where impacts to environmental resources are
unavoidable.
c
Senior Biologist, Miami-Dade County DERM Environmcntally
Endangcred Lands (EEL) Program, Miami-Dade County (2005-
Present): Responsible for assisting Miami-Dade County with the
preparation of long-term Land Management Plans for all of the EEL
parcels located in Miami-Dade County, Florida. Tasks include
coordination with DERM's EEL Program and Miami-Dade County
Natural Areas Management, existing data reviews, research, intensive field
investigations, wildlife surveys, natural community inventories and
mapping, and preparation of relevant sections of the land management
plans.
URS
Keith Stannard, (contd)
c
c
Project Manager, Miami Lateral, Florida Gas Transmission
Company (2005-2007): Project Manager for environmental-related tasks
associated with installation and operation of pig launcher and receiver
facilities along FGT's existing pipeline lateral in Miami, Florida. Tasks
include conducting wetland and T&E species assessments, cultural
resource assessments, preparation of FERC clearance letters to USF\X!S,
DCA and SHPO, contamination assessments (phase I and Phase II),
regulatory agency coordination, applying for and obtaining a Class V
Dewatering permit through Miami-Dade County DEIUvf, MOT plans
preparation with a lane closure analysis and permitting through FDOT.
1-\dditional tasks include conducting an environmental issues review and
an issues map using GIS for the entire lateral to preliminarily identify
environmental issues prior to conducting the smart pig test for possible
pipeline anomalies due to the requirements of the USDOT Office of
Pipeline Safety, agency coordination, and applying for after-the-fact
permits where impacts to environmental resources are unavoidable.
Project Manager, SR 91/Florida's Turnpike Mainline Relocation
Phase I, II and III, Broward County, Florida Gas Transmission
Company (200S-Present): Task Manager for environmental-related
tasks associated with relocating three scgments of FGT's mainline
pipelinc along SR 91/Florida's Turnpike in Broward County, Florida.
Tasks include conducting wetland and T&E species assessments,
preparation of FERC clearance letters to USF\X!S, DCA and SHPO,
contamination assessments (Phase I and II), groundwater well installation
in proximity of a superfund site (Florida Petroleum Reprocessors), trench
dewatering sampling, well monitoring, and applying for FDEP ERPs,
USACE Section 404 Pennits, and Broward County Environmental
Resource and Dewatering Licenses.
Project Manager, Misc. Minor Projects, Florida Gas Transmission
Company, 2003-Present: Project Manager and task leader for various
minor pipeline and compressor station projccts in Southeast Florida.
Tasks includc Federal, State and local agency environmental resource and
dewatering permitting, wetland evaluations, cultural resources
assessments, contamination assessments (Phase I and II), ground water
and soil sampling and analyses, contamination remediation, air
sampling/ monitoring, dewatering sampling/monitoring, MOT plans
preparation and permitting, threatened and endangered species surveys,
long-term mitigation monitoring, pipeline relocation construction
oversight/inspections, permit compliance, and environmental feasibility
studies for new potential pipeline routes and compressor station locations.
Project Manager, Port Everglades Lateral, Broward County, Florida
Gas Transmission Company (2003-2007): Project Manager for
environmental-related tasks associated with installation and operation of a
pig launcher facility and right-of-way maintenance activities along FGT's
existing pipeline lateral in Broward County, Florida. Tasks include
conducting wetland and T&E species assessments, cultural resource
assessments, preparation of FERC clearance letters to USF\X!S, DCA and
SHPO, contamination assessments (phase I and II), and applying for and
obtaining federal, state and local environmental permits for pipeline right-
c
URS
KeIth Stannard, (contC/.)
r
'-'"
c
of-way maintenance actlvItles for impacts to coastal mangroves.
Additional tasks include conducting an environmental issues review and
an issues map using GIS for the entire lateral to preliminarily identify
environmental issues prior to conducting the smart pig test for possible
pipeline anomalies due to the requirements of the USDOT Office of
Pipeline Safety, agency coordination, and applying for after-the-fact
permits where impacts to environmental resources are unavoidable.
Environmental Task Manager, Key West International Airport,
Runway Safety Project, Monroe County (2005-Prcsent): Task
Manager rcsponsible for conducting T&E species surveys, seagrass and
other benthic resource surveys within the adjacent salt ponds, wetland
delineations within the limits of thc runway safety area and the proposed
on-site mitigation area, regulatory agency coordination, preparation of
relevant environmental sections of the Environmental Asscssment and
assisting with the preparation of federal and state environmcntal permit
applications. Tasks also include conducting a Bird Strike Assessment
which includcd extensive wildlife surveys within a 5-mile radius of the
island and idcntification of wildlife attractants and ways to minimize or
removc those attractants from airport propcrty.
Project Manager, Jacksonville Lateral, Florida Gas Transmission
Company (2006): Project Manager for environmcntal-related tasks
associated with FGT's existing Jacksonville Lateral. 'fasks include trench
dewatering discharge sampling and analysis, MOT plans prcparation and
pcrmitting through FDOT
Projcct Manager, 6-inch Homestead Lateral Loop, Miami-Dade
County, Florida Gas Transmission Company (2005-2006): Project
Manager for cnvironmental-related tasks associated with relocating a
portion of FGT's pipeline due to a new housing developmcnt in tv1iami-
Dadc County, Florida. Tasks include conducting wetland and T&E
specics assessments, preparation of FERC clearance letters to USF\X1S,
DCA and SHPO, contamination assessment (phase I), applying for an
FDEP ERP, a USi\CE Section 404 Permit, and a Miami-Dade County
DERM Class V Dewatering Permit.
Project Manager, N.W. 74th Street, Miami, PD&E Study and
Environmental Permitting, FDOT, District VI (2004-2006):
Managed and directed environmental tasks associated with the
performance of a PD&E Study. Tasks included preparation of a \'\TER,
ESBA, CSER, NSR, AQRand an EA and FONSI for submittal to
FH\VA (including public involvement) for proposed roadway
improvement and new roadway alignment alternatives. Also, prepared
and submitted environmental resource permit applications through the
SFWMD and the USI\CE and obtained permits for proposed
Improvements.
c
Project Manager, N.W. 74th Street Interchange at Florida's
Turnpike, Miami, PD&E (SEIR) Study and Environmcntal
Permitting, FDOT Florida's Turnpike Enterprise (2004-2006):
Managed and directed environmental tasks associated with the
performance of a PD&E Study. Tasks included preparation of a \\/ER,
URS
KeIth Stannard, (contC/.)
c
ESBA, CSER, NSR, 1\QR and a SEIR for submittal to FHW"~ (including
public involvement) for proposed interchange improvement alternatives.
1\lso, prepared and submitted environmental resource permit applications
through the SF\X1MD and the USACE and obtained permits for proposed
lmprovements.
c
Project Manager, 8-inch Rinker Lateral, Miami, Florida Gas
Transmission Company (2003-2006): Project Manager for
environmental-related tasks associated with relocating and
inspecting/maintaining FGT's existing Rinker Lateral. Tasks include
conducting wetland and T&E species assessments, cultural resource
assessments, preparation of FERC clearance letters to USFWS, DCA and
Sl-lPO, contamination assessments (Phase I), applying for and obtaining
an FDEP ERP, a USACE Section 404 Nationwide Permit, a SFWMD
Right-of-Way Occupancy Permit, and a Miami-Dade County DERlv1
Class V Dewatering Permit, trench dewatering discharge sampling and
analysis, MOT plans preparation with a lane closure analysis and
permitting through FDOT.
Environmental Task Manager, Key Deer HCP and Wildlife
Underpasses, Big Pine Key, FDOT, District VI (1999-2006):
Prepared permit applications and obtained a Scction lO(a)(l)(B) incidental
take permit for the endangered Key deer and other protected species.
Assisted in preparation of N EP A documentation and a Habitat
Conservation Plan for federally protected species that could be impacted
by direct and indirect effects from land development activities on Big Pine
and No Name Keys in Monroe County, Florida. Also assisted 111
obtaining environmental approvals for wildlife crossings designed to
reduce roadway mortality of Key deer and other protected wildlife.
Senior Biologist, SFWMD Wildlife Survey for ST A 5 and ST A 6,
Palm Beach County (2005): j\ssisted with organizing and conducting
extensive wildlife surveys and reporting for over 1,100 acres in northwest
Palm Beach County to assist with the evaluation of the ST A 5 and 6 sites
for use as \Vater Treatment Areas as a part of the on-going CERP project.
Senior Biologist, Gulf South Pipeline Abandonment, Alabama, Gulf
South, (2005): Assisted URS Houston with the coordination and
collcction of field data (collected by others) including threatened and
endangered specles studies, wetland delineations and functional
assessments, contamination assessments, etc. to prepare F-1
Environmental Documcntation (for certification from the FERC) for
abandonment of an existing 40-mile section of the Gulf South Pipeline in
southern .Alabama.
c
Environmental Task Manager, Sombrero Beach Road PD&E
Study, Vaca Key, Monroe County, FDOT, District VI (2002-2004):
Task Manager for environmental tasks associated with the performance of
a PD&E Study. Tasks included preparation of a WER, ESBA, CSER,
NSTM, AQTM and a CatEx II for submittal to FHWA for proposed
roadway improvement alternatives immediately adjacent to coastal
wetlands of the Florida Keys National Marine Sanctuary.
URS
Keith Stannard, (contC/.)
c
c
Environmental Task Manager, SR 826 Mainline Relocation, Miami,
Florida Gas Transmission Company (2002-2003): Task .tvlanager for
environmental-related tasks associated with relocating a portion of FGT's
mainline pipeline along SR 826/Palmetto Expressway in l\1iami-Dade
County, Florida. Tasks include conducting wetland and T&E species
assessments, preparation of FERC clearance letters to USF\X1S, DCA and
SHPO, contamination assessment (Phase I), applying for and obtaining an
FDEP ERP, a USACE Section 404 Permit, and a l\1iami-Dade County
DEIUvI Class V Dewatering Permit. Additional tasks include federal, state
and local agency environmental permitting for installation of a pig
launching facility at the interchange of SR 826 and N\X1122nd Street.
Project Biologist, U.S. Army Corps of Engineers' Florida Keys
Carrying Capacity Study (1999-2003): Project Biologist responsible for
conducting research to determine the limiting factors of 10 marine and
terrestrial ecosystems and 24 species known to exist within the Florida
Keys, Monroe County, Florida. Additional tasks included ground-
truthing of natural ecosystcms throughout the cntire Florida Kcys to assist
with mapping of historic ecosystems by GIS. Results of these tasks wcre
incorporated into the GIS model and rcports for the Florida Keys
Carrying Capacity Study.
Senior Biologist, Phase V Expansion, Florida Gas Transmission
Company (1999-2003): Coordinated and conducted threatened and
endangercd species studies, gophcr tortoise permitting through FFWCC
and relocations, wetland delineations and functional assessments,
contamination asscssments (phase I), applying for and obtaining FDEP
ERPs, USACE Section 404 and Section 10 permits and local agency
cnvironmental permits, N PDES and dewatcring permitting, F-1
Environmental Documentation (for certification from the FERC) and
QA/QC for approximately 260 miles of new pipeline and 12 compressor
stations throughout Florida, Alabama and Mississippi.
Registration I Certification
Florida Chamber of Commerce Environmental Permitting Summer
School ('98,'02,'05,'06,'08)
OSHA 40-Hour Health and Safety Training, 1994 (8-Hour Refresher
Nov. '(8)
FDEP Uniform Mitigation Assess. Method, 2005
TREEO Seminar on Threatened and Endangered Species of Florida,
1998
Certificate of Appreciation, Nova Center for [\pplied Research and
Development, 1997
USACE Wetlands Delineation Cert. Training, 1996
FDOT Wetland Evaluation Technique (\VET II) Training, 1994
P ADI Rescue Scuba Diver Certification, 1992
c
c
c
c
Areas of Expertise
Quality Syqems .\fanagcment.
Years of Experience
\\ilh UZS: .2 Yl'ars
\\-irh Other Finn:;: 29 Year,
Education
B.s./ 19t1-l/Young,rO\m Sl. L'.j
!\lccha11lcal L':nginecring
Registration/ Certification
1 <;9i / Certlt1ed Lead
\,;,;c,;,;or/97162--l22()-l/ Briti,iJ
Standard, 1 n,ritute (l)S I)
URS
William I. Travis
Regional Quality Officer
Overview
Mr. Travis is an accomplished quality systems professional with nearly 30
years of successful experience, working in progressively responsible
positions in aerospace, automotive, medical/FDA, and service industries.
He possesses strong leadership skills, and is a gifted speaker and trainer,
having developed and conducted training classes on:
.
Continuous Quality Improvement
Public speaking
Self Inspection/Self Sufficiency
Internal Auditor Training
Statistical Process Control
Shop Math
Geometric Dimensioning and Tolerancing
Developing Project Management Plans
.
.
.
.
.
.
.
Project Specific Experience
All URS Projects: Mr. Travis is responsible for ensuring that all projects
are managed in compliance to our Quality Management System (fully
complian t to ISO 9001 :2(00). This is accomplished through:
· Training URS personnel affecting projects to URS policies,
procedures and work instructions, as well as:
o Internal Auditor training
o Continuous Quality Improvement
o ISO 9001
o Project Management
o Various other quality related courses
· Active participation in planning phase most projects
· Performing internal, and random directed audits of past and
present projects
· Corrective and preventive actions
· Document and data control
· Final review
o Documented evidence of compliance to QMS
Professional Societies/ Affiliates
Sr. Member, American Society of Quality (ASQ)
URS
William Travis (contC/.)
~
~
Specialized Training
Center for Quality Excellence, Southern Polytechnic State University
· 1997 Managing Quality
· 2001 ISO 9001:2000 Auditor Refresher Course
Clemson University
· 1994 Quality Management in the Laboratory
· 1997 Supplier Certification
Learning International
· 1995 Interpersonal Management Skills
MBS, Inc.
· 1998 - 1999 Management by Strengths
· 1997 Essentials in Managemcnt
ASQ
.
2006 Quality Methods for the Service Industry
2006 Certified Manager of Quality/Organizational Excellence
.
,.-
~
Chronology
March 1994 - March 1996 MSK Precision Products, Tamarac, FL
Quality Manager
· Responsible for development and maintcnance of the Quality
Management Systcm for manufacturing of medical devices and
product for aerospace and telecommunications.
· Implcmented Self-Inspection/Self-Sufficiency program, which
reduced scrap and rework by 50% in the ftrst year.
· AS9100B OASIS database reflected 100'Yo and 99% quality rating.
c
March 2000 - February 2004 Hoerbiger Corporation of America,
Pompano, FL
J\lanufacturer of compressor valves for petroleum industry.
Corporate Director of Quality / Health, Safety and Environment
· Responsible for Quality Management Systems and Health, Safety
and Environment program for 22 manufacturing & service
facilities throughout U.S. and Canada
· Obtained ISO 9000, and ISO 9001:2000 registrations for all
facilities:
o \"X1rote Quality Policy Manual, procedures and work
instructions for Corporate Quality Policy compliant to
ISO 9001:2000 and ISO 14001.
o Secured corporate multi-site registration for all facilities.
o Implemented Self Inspection/Self Sufficiency program
that saved nearly $500,000 in scrap and rework cost over
2003.
o Developed calibration lab that earned significant income
for the corporation.
2
URS
William Travis (contC/.)
~
'....
o Trained approx. 60 internal auditors throughout the
corporation.
June 1996 - November 1999 B/E Aerospace, Delray Beach, f'L
Manufacturer of galley products for commercial aircraft
Quality Engincer/Manager
· Successfully lead efforts to obtain very stringent Boeing 01-9000
AQS certification.
o Wrote Quality Policy Manual, all procedures and work
. .
l11S trucUons
· Effectively implemen ted Self-Inspection/Self Sufficiency
· Developed and implemented Supplier Certification program
dcveloping a total of 5 certified suppliers
· Through the development of inspection software, streamlined
receiving inspection process from 40 days to less than 3 hours.
· Through the development of inspection software, eliminated
95% of paper quality records.
· Successfully implemented Continuous Quality Improvement
program.
c
January 1994 - June 1996 Sensormatic Electronics Corporation, Boca
Raton, FL
Loss Prevention
Quality Engineer
· Developed Quality procedurcs for pilot project security tag
· Developed and implcmented software program to accommodate
100o;() testing data which gathered, analyzed and reported quality
yield and Statistical Process Control data.
· Developed and implemented procedures for audits, and
conducted training classes for all operators.
· Performed internal ISO 9000 audits.
Production Supervisor
· Supervised over 100 employees and several manufacturing and
assembly lines.
· Through the implementation of Quality practices and principles,
production increased 30% while quality improved nearly 50%.
c
Manufacturing Engineer
Principle Engineer of silicone wafer processing into diodes for security
tags/pick and place operation.
· Over a period of three months, silicon wafer scrap was reduced
from 40% to 10% by redesigning raw silicone scribing and
breaking techniques, as well as revisiting quality control test
cntena.
· \X1rote ISO 9000 manufacturing and maintenance work
instructions. Trained personnel on production methods.
· Designed, developed and modified machinery to implement and
enhance manufacturing processes leading to process validation
3
URS
William Travis (contd)
r'
~
] anuary 1992 - December 1994 Hirol Company, Pompano, FL
Quality Manager
· Developed and implemented Quality Management System
· Developed Certified Supplier Program.
· Developed Clean Room process.
May 1984 - May 1989 Packard Electric Div. Of General Motors
Corporation, \X1arren, Ohio
Sr. Laboratory Engineer
· Performed physical, electrical, and chemical testing on
automotive components, materials, and systems
· Designed various testing apparatus and fixtures
· Developed testing procedures and methods
~
'..,.
c
4
,.-
~
Areas of Expertise
1\ Icchanical [:ngint'cring
Electrical Engineering
Project &. Engr. l\ lanagemct1[
Years of Experience
\'\"ith L'RS: .'\ \'ear,
\'\"ith Other Firm,: "W Year,
Education
c
\1L\.\ / L'niycr,it\" of \,\i,con,in-
O,hkmh II <)8S
ns /i\kchanical I:ngineenng
/;\ lilwaukec School of Engineering
/1<J77
Registration / Certification
PI:;Flc lrida/#(J-1--1-W
PF/\,\'i,ccllbin/#21 (1-13.
PI:; \lichigan/#-1S<J 19.
PL/i\laine/#<)Sll.
PF/Penn,;\'h-ania/#(iSS(r71:. and
Projecti\ I anagcmclll
Pre ,fc"ional/ Pi\ IP#27 -1-277
L"RS Proiecti\lanagcr Ccrtirlcati, >l1
r
~
URS
Dale S. Wiley, PE PMP MBA
Project Manager /Mechanical & Electrical Design Leader
Overview
Mr. \X1iley has over 30 years of experience in the planning, design,
construction management and inspection, technical and
economic/ financial evaluation, and modification/ rehabilitation,
construction oversight and project managemcnt of pO\ver water resource,
and civil/mechanical projects.
His responsibilities have included the planning, design, analysis,
construction management and inspection, and evaluation of projcct
featurcs such as: buildings, nuclear systems, boilers, turbines,
powcrhouses, dams, intake structures, canals, penstocks, gates, stoplogs,
trash racks, material handling, environmental cleanup and wastewater
treatments. I-Ic has been responsible for the preparanon of: mechanical
and hydraulic design computations for ncw and existing nuclear, fossil
fuel and hydroelectric power plant projccts, including design of
mechanical e(]uipment, piping, ventilation, equipment layout and a dam
water control gate modifications; contract plans and specifications for
construction and equipment procurement; and construction management
oversight.
Mr. \V'iley has been the lcad design enginecr for a large NPDES
wastewater treatment pump station and treatment system. He has been
responsible for the project engineering and construction management for
a 6050' long 9' diameter steel penstock piping project. He has been
responsible for the project engineering and construction management for
a large hydro dam & dike embankment stabilization project.
111 addition tvlr. \V'iley worked on numerous small and large projects at 3
Nuclear Power Plants, 10 plus Fossil Fuel Power Plants, 20 plus
Hydroelectric Power Plants and 10 plus Everglades and Environment
Restoration Sites. He served on a plant operating staff for a period of 5
years as the Senior Plant Engineer at the \X1isconsin Public Service
Corporation 372 M\V' J.P. Pulliam Coal-Fired Power Plant. He has been a
feahu"ed speaker at 3 distributed generation con ferences.
Prior to joining URS Corporation and \X1isconsin Public Service, he
worked for Gilbert/Commonwealth ,\ssociates (AK:A: \X1orleyParsons) in
the electric utility power plant design and construction management field.
He has had increasing responsibility and was assigned as Project
Manager/Project Engineer on multiple electric power plant and gas utility
projects. I-lis experience includes: building projects, nuclear power plant
projects; fossil fueled power plant projects; hydroelectric and water supply
dams and projects; shoreline protection projects; fossil fueled power plant
projects; flyash landfill projects; former manufactured gas plant
remediation projects; distributed power projects and unique and unusual
building and other projects.
URS
~
~
Dale Wiley (contC/.)
Project Experience
Mechanical & Electrical Design Leader (2006 - Present)
Facilities Design Leader for the electrical and mechanical facility design
engineering department for the governmental, industrial, and electrical
power engineering projects. Facilities Design Leader for the electrical and
mechanical design engineering for the South Florida Water Management
District Stormwater and Everglades restoration projects. Involved in the
engineering management of a 6,397 acre water treatment, 18 miles of 13.2
kV three phase underground electrical power distribution, and 2,100 cfs
pump station project including all detail design reports, design drawings,
technical specifications and major pump system equipment procurement.
Mechanical and electrical design leader for the electrical and mechanical
design engineering for the South Florida \X1ater Management District
Stormwatcr STA 6-2 Power Distribution Project. Completed a feasibility
study of power options, and then proceeded to design and construction of
an isolated interim underground 13.2 kV electrical distribution power
system with LP gas electric generators (power Pilot Project) for the STA
6 Section 2 and STA 6 Scction 1 enhancements projects. Mr Wiley is
currently thc lead shift supervisor in the operation and maintenance of the
electrical generators and 13.2 kV system.
c
Professional Societies! Affiliates
American Society of I'vlechanical Engineers (ASME)/Member 24
years/#1321686
PMI Certified as Project Managcment ProfessionaI/PMP#274277,
Scptcmber 7, 2005
Other: Oconto, WI Harbor Commission, Chairman; Green Bay, \X11 Plan
Commission, Commissioner; and Frccmason, Master Mason
Specialized Training
.
.
.
.
.
.
.
.
C .
.
Commonwealth Associates, Ine. "Basic Powcr Plant Systems"
General Physics Corporation "Nuclear Shift Technical I\dvisor-
Sys tems"
\X1isconsin Public Service Corporation "Radiation Safety"
Chesterton Company "Mechanical Seals"
Technical Seminars, Ine. "Piping Design & Fabrication per
ASME Section III and 1331 Codes"
AAA Technologies, Ine. "Triflex Piping Analysis Computer
Program"
Lightning Mixing Equipment Co. "Activated Sludge Process"
University of Wisconsin-Extension "Arc Welding Processes and
Their Applications"
Wisconsin Public Service Corporation and URS "QA/QC
Indoctrination & Training"
I'vWwaukee School of Engineering "Construction Claims
Seminar"
2
URS
Dale Wiley (contC/.)
/'"
'--"
. Teledyne Engineering "ASME Boiler & Pressure Vessel Codes"
. ASME/IEE/ ASCE "Joint Power Conferences"
. Northwest Tcchnical Institute "\X1elding Seminar"
. EPRI!EP A "Flue Gas Desulfurization Symposium"
. 40-Hour Hazwopcr/1997, WI Landfill Operator/1987,
Competent Person/1997, \XIPSR Leadership Development/2003
. PMI and URS Project Manager Training
Security Clearance
Kewaunee Nuclear Power Plant
Chronology
c
Gilbert/Commonwealth Associates (AKA: WorIeyParsons),
Reading, Pennsylvania and Jackson, Michigan
Engineering Technician (1973)
Associate Mechanical Engineer (1977 -1979)
Engineering Technician for the Mechanical and Nuclear Engineering
Department performing various technical tasks for the Three Mile Island
Unit 1 (PA) and VC Summers (SC) Nuclear Power Plants. Power plant
design engincer for thc design of modifications to Ohio utility coal fired
power plants.
Performed engineering tasks such as: hydraulic calculations for channel,
pump, and pipe sizing; I-IV AC calculations for heat loss and ductwork
sizing; and equipment material and performance selection. Responsible
for the dcsign of the $21M NPDES wastewater treatment system/plant of
the Eastlake and Lakeshore Power Plants in Ohio.
Wisconsin Public Service, Green Bay, Wisconsin
Mechanical Engineer (1979 - 1984) (1989 - 1999)
Plant Engineer (1984 - 1989)
Project Manager and Project Manager 2(1999 - 2005)
Power plant design engineer and project manager for the design and
construction management of new and numerous modifications of the
electric utility power plants.
c
Performed engineering tasks such as: nuclear reactor and steam generator
subsystem design selection and specifications; hydraulic calculations for
pump and pipe sizing; HV AC calculations for ductwork and fan sizing;
electrical wire and disconnect sizing and selection; design of dock walls
and structural sizing; grade and earthwork design; road and building
design selection and specifications; utility coal ftred boiler tube selecting
3
URS
Dale Wiley (contC/.)
c
and welding criteria; and supervlslOn of engmeenng design work and
construction by others.
Responsible for the design, review, project and construction management
of electric and gas utility projects as: Kewaunee Nuclear Power Plant
Reactor Head Vent System and other TMI modifications, new $15M 377'
Pulliam Power Plant Chimney, $5M C\X1A/\X1eston/Pulliam ash storage
landfills, Pulliam Unit 5 slope boiler tube replacement, $1.2M Oneida
Diesel Generator, Pulliam Power Plant Propane/Air Plant, Kewaunee
Nuclear Power Plant Simulator Building, $41M l'vIGP Gas Plant Site
Remediations, Prickett Hydro Selective Withdrawal Structure Siphon,
$6M Victoria Hydro 6050' Penstock Replacement, and $2.5M High Falls
Hydro Dam & Dike Embankment Stabilization.
c
URS Corporation, Boca Raton, Florida
Mechanical & Electrical Design Leader (2006-Present)
Mechanical and electrical desit,>11 leader for the electrical and mechanical
design enginecring for Power, South Florida \X1ater Management District
Stormwater and Evergladcs Restoration, and Palm Beach County Solid
waste Authority projccts. Involved in the cngineering management of
projcct design, design reports, technical specifications, construction
managemcnt and operations.
Mechanical and electrical design leader for the electrical and mcchanical
design engineering for the South Florida Water Managcment District
(SF\VI\1D) Stormwater and Evcrgladcs restoration projects. Completed a
feasibility study of power options, and then proceedcd to design,
conslrucuon managemcnt and multi-year operation of an isolated interim
underground distribution power system with LP gas electric generators
(Powcr Pilot Project) for the STJ\ 6 Section 2 and STA 6 Section 1
enhancements projccts. Completed a feasibility study of the Everglades
Restoration Stormwater Treatmcnt Area (STA) Compartment C Area
Basis of Design Report options, and then proceeded as cngineering
manager for the design of the STA \X1ater Control Gates, 100 cfs
Hydration Pump Station, and 2100 cfs Major InOow Pump Station.
Mechanical and electrical design leader for the mechanical and electrical
design engineering for Roker Point and Emerald Bay Utility Projects,
Great Exuma, Bahama.
Mechanical and well design leader for the mechanical and well design
engineering for the Palm Beach County Solid Waste Authority two 3050
foot deep Injection Well Replacement and 2000 gpm Pump Station
Upgrade.
r
'--"
4
~
'--"
Areas of Expertise
Capital Imprc)\'emenr Progranrs
Program i\Ianagemen t Services
Public Facilitie,/infra,u'ucrure
CCN _\ Requirements
i\Ianagemcnr of multiple projects
and project leam~
Public .\genC\- Expenence
Years of Experience
\\'irh UZS: _) Years
\\ -ith Other Firm,: 27 Year,
Education
B" \ / L'ni"er,ity of. \rizona /
.\rchircclUlT
r
~
Reg istration / Certification
Ccrritied Construction i\ lanagl'l'
frolJ1 Construction I\ lanagclllCtll
.\,~ociati()n of .\menca
UZS Cerritied Project I\lanager
r
~
URS
David Wilson, CCM
Project/Construction Manager
Overview
David \'Vilson brings over 30 years experience in the design and
construction industry. As a senior level program and project construction
manager, he has been responsible for the management of capital
improvement programs and projects from $20M - $1.28 in value. Mr.
\X1ilson has experience and knowledge of both federal and state (FS 287
and CCNA) compliance and regulations and the required management of
public funded projects. I-lis work with municipal, county, state and
federal agencies has led to successful capital improvement programs and
projects. Mr. Wilson brings strong experience in total project
management including planning, environmental, health and safety, design
and construction management services which includes direct interface
with agency funding and using agency departments. He has managed and
led professional project service teams for both publically funded programs
such as Town of Southwest Ranches, Palm Beach County S\'V A as well as
for private industries such as Intel, Boeing and Raytheon. Mr. \X1ilson also
brings knowledge in wide range of project types as well as infrastructure
and environmental consultancy services. He has spent the last three years
managing a project and construction teams involved with a large capital
improvement program in Palm Beach County Florida.
Project-Specific Experience
Public CIP - Owners Program PM/CM Manager:
Program Director
Solid Waste Authority of Palm Beach County, FL
$1.28 Capital Improvement Program
Services provided: Program Management, Project & Construction
Management, Claims Litigation Support, Design-Build Project Delivery
Support. Program and construction management services for the
1\uthorities 10 year capital improvement project plan that included 30 new
capital projects for: Landfill and associated utility support infrastructure,
Transfer stations, Materials recycling, \X1aste to Energy plant
modifications and future $700M Mass Burn facility. Services also
included assistance with the development and implementation of Design-
Build project delivery method. Assistance to Authority for re-organization
of Engineering Dept. Development and implementation of a program
wide Project and Construction Management Manual. CM support
services for: Water & Waste Water Utility Relocation for S\X'CTS Phase I
Partial Closure ofLF Cells 7 -10; Central County Transfer Station Phase
I - construction completion; Central County Transfer Station Phase II -
renovation / re-use; New Materials Recycling Facility - owner
representative for D-B; Program Management Support Services included:
Assistance with oversight of $1.2 B capital projects program including
management and submittal of monthly Capital Program Reports.
URS
David Wi/son, CCM (contC/.)
~
~
Assistance with oversight of $1.2 B capital projects program including
management and submittal of monthly Capital Program Reports.
.-\ssistance with development and management of the Master Program
Schedule for all projects in the program. 1\ssistance with overall project
coordination and planning for staging and phasing of projects.
Assistance with improvements to .-\uthorities project management
practices for consistency and improvement of project schedulc and
budgets.
c
CIP Program Manager
Capital Improvements Program, Southwest Ranches, FL
Management of $40M capital improvement program.
Program Manager reporting to Town l\dministrator for the managcment
of Town's CIP program which included: Planning and dcvelopment for a
new town hall, Planning and development of six ncw parks, Drainage and
road improvement projects
Planning for future bridge and intcrstatc intersection improvements;
Managcment of Town's environmental mitigation pros'ram; Planning and
development of bike and horse trails; Managed the various design,
cngineering and constructjon contracts associated with the Town's capital
program. Program management services included: 1\ssisting the Town in
the development and implementation of a capital program procurcmcnt
policy and selection process requirements. Provided the Town the project
management and field inspectors for the capital program construction
projccts. Provided the administrative management for the Town's design
reviews of CIP projects and the management of the Town's l\/E
consultants including contract negotiations and invoicing rcvicw.
Presentations to the mayor and council on the status of the program and
neighborhood homc owner associations.
c
Senior Program Construction Manager
Seattle School District BEX II Program, Seattle, W A
$384M 4 year capital program
Program included over 24 elcmentary, middlc and secondary schools
throughout thc district. All design and construction projects required
planning and zoning review by City agencies which ultimately required
work involving improvements to site, street and utility infrastructure
supporting thc school district's project site. Program Construction
Management services included assistance to the District in the
procurement, selection and contract negotiations for both professional
A/E services and thc CMAR. SelTices also included the individual
projcct management as well as the overall management of the entire CIP
and reporting to thc School Board on a regular basis. Management
services included coordination and oversight of the entire project from
planning through design and construction and as District's representative
_ presenting projects to the various governmental agencies including City
streets and utilities departments. Typical Program project: Cleveland High
School's $60.3 million, 187,700-square-foot project being delivered using
the GC/CM process. Project included historic renovation, partial
demolition, and new additions to increase student and instructional
2
URS
DavId Wi/son, CCM (contC/.)
~
~
capacity. The project required the replacement of existing water / fire
lines and waste water lines that were fronting the project site. \\1ork also
included removal of underground tanks, soil remediation, curb and
sidewalk replacement and street intersection improvements.
~
l..,
Capital Program PM/CM Operations Manager, Owner's
Representative services for Jackson Memorial Hospital and
University of Miami's Miller School of Medicine
Miami, FL
As the senior manager for health care PM/CM serviccs consisting of
project teams providing planning, design management, construction
management and commissioning serviccs for JMI-I and UM Miller School
of Medicine. Overall program operations covered the following serviccs:
The dcvelopment of the ncw JMH Master Plan and Phasing Studies for a
$480M, 10- year expansion program. The Owner's Project Representative
of thc Cl'vi1\R team for the new $459M UM Miller School of Medicine
high rise Medical Practice Building. Project program included 144 beds
and 850,000 gsf. The Project Management team for the JMH Capital
Projects Program covering over 50 projects at over $200M in cost.
Projects included: Renovations to patient wings (campus wide);
Renovations to OR suites to support Di Vinci robotic surgical system;
Renovations to Rehab, Cardio Serviccs and Radiology; Emergency
generator upgrades; and Long term carc facility upgrades. The program
and projcct management teams consisted of over 15 scnior level project,
planning, and design managers who providcd Planning, Pre Construction
and Construction Management services. This included the managemcnt
of numcrous local and nationaI1\/E and construction firms doing
business with JMH and UM Miller Mcdical School.
Project Management for Private Defense Contractors:
Project Architect
Apache Attack Helicopter Assembly Plant, Mesa, AZ
The Boeing Company
Project planning and design scrvices for the initial development of the
1\pache AH-64 helicopter assembly plant (under McDonnell Douglas)
and future plant expansion (under Boeing) for Apache and Longbow
helicopter programs. Project included new assembly plant headquarters
facility and helicopter testing / training facilitics for U.S. .A.rmy.
c
Project Manager
Raytheon Consolidation Program, Tucson, AZ
Raytheon Missile Systems
Consolidation of multiple plant operations to the Tucson plant and one
million SF of expansion to plant facilities (offices, labs, testing & support,
manufacturing and assembly) for development and manufacturing of
missile systems for Army, Navy and Air Force. Services included master
planning, and on-site A/E engineering support services.
3
URS
DavId Wi/son, CCM (contd.)
c
Project Management for U,s, Department Of Defense:
Project Manager
Conventional Munitions Shop & Administration Facility
USAF Luke Air Force Base, Arizona
New Administration Facility and Conventional Munitions maintenance
shop. Munitions shop designed under blast containment guidelines. PM
in charge of proposal development and A/E services and submittal for
IDIQ DOD funded contract administered under Dept. Of The Army
Corp Of Engineers, Sacramento District.
Project Manager
Composite Training Facility
USAF Reserve Davis Monthan Air Force Base, Arizona
Three New Facilities consisting of: Helicopter Maint. Hangar and
Hazardous Materials Storage Bldg; Squadron Operations Building;
Fire Station (crash). PM in charge of proposal development and I\/E
services and submittal for DOl) funded contract administered under
Dept. Of The Army Corp Of Engineers, Sacramento District.
c
Project Manager
Naval Training Center and Fleet Anti-Submarine Warfare Training
Center Master Plan Services
NTC / ASW U.S. Navy, San Diego, California
Master Planning services updating NTC / 1\S\V site inCOlvorating
requirements from NA VFACINST, San Diego Regional Plan, San Diego
Naval Shore Activities and the Peninsula Community Plan. Major plan
recommendations led to the consolidation of operational support
functions and improvements in traffic flow and congestions at main gates.
Plan updated and incorporated current l'vlilcon Projects identifying
Priority, FY, Scope, Cost and design considerations within the NTC /
AS\V Training Center site. PM in charge of proposal development for
Planning & A/E services and submittal for DOD funded contract
administered under U.S. Navy WESDIV Naval Facilities Engineering
Command, San Bruno, Ca.
Project Manager
Consolidated Training Center A.N.G.
Navajo Army Depot, Arizona
New Consolidated Training Facility (112,500 SF) consisting of new
Barracks (600 personnel), Supporting and Ancillary facilities. PM in charge
of proposal development and A/E & investigative & planning services
and submittal for Arizona Department of Emergency and I\1ilitary Affairs,
contract administered under Az. National Guard
c
4
URS
David WIlson, CCM (cont'd.)
c
Project Management For U.5. Department OF Justice:
Senior Project Manager
Florence Service Processing Center, Florence, AZ
U.S. DO] INS (now ICE under DHS)
Services included: Pre Design Planning with DO), INS, Boarder Patrol,
GSA and COE Program Managers and local municipal representatives
and utility providers. Master Planning, Dcsign and Construction Phasing
for thc 10 year $19M Construction program.
PM Responsibilities included direct interface with DO), GSA and INS
(ICE) project represcntatjves. Management of the project team
developing the multi phase master plan and the phase 1 project design
and construction administrarjon serviccs for new 55, 000 SF detainec
processing, justice ccnter with courts and detention facility which included
a medical operations area for emergcncy triage, examination rooms, X-
Ray, isolation ward, pharmacy and mcdical staff offices. PM in charge of
proposal development and all Planning & A/E services and submittal to
U.S. Gcneral Services Administration.
c
Senior Project Manager
EI Centro Service Processing Center, EI Centro, CA
U.S. DO] INS (now ICE under DHS)
Services included: Pre Design Planning with DO), INS, Boarder Patrol
and COE program managers for the detention center program
Services includcd new site master plan, design and construction
administration scnriccs for ncw 25,000 SF detainee proccssing center and
detention facility which includcd a ncw kitchen / dining hall and a new
mcdical operations area for cmergency triage, examination rooms, X-Ray,
isolatjon ward, pharmacy and mcdical staff offices. PM in chargc of
proposal dcvelopment and all Planning & A/E scrvices and submittal to
U.S. Gcneral Services Administration.
~
~
Senior Project Manager
U.S. Board Crossing Station Improvements, CA
U.S. DO] INS & Border Patrol (now ICE under DHS)
Border Crossing Station Sites included: San Ysidro, Ca. / Tijuana, Mex.
and the Calexico, Ca. / Mexicali, Mex. crossing sites.
Improvements to the San Ysidro / Tijuana site (world's busiest border
crossing) services included Border Site Traffic Studics (including car /
truck & mass transit inspection lanes), pcdestrian crossing studies for
security and control. New road lane alignments, signage and paving. Ne\v
station booths and hardening, security systems and lighting and covered
crossing roof structure. Services included Master Planning, roadway / sitc
civil engineering and architectural design. Pre Design Planning with INS
and U.S. Border Patrol. PM in charge of proposal developmcnt and all
Planning & A/E services and submittal to U.S. General Services
Administration.
5
URS
David Wi/son CCM (contd)
c
Senior Project Manager
U.S. Board Crossing Station Improvements, AZ
U.S. DO] INS & Border Patrol (now ICE under DHS)
Border Crossing Station Sites included: Nogales, Az. / Nogales, Mex. thc
Naco, AZ. / Naco, Mex. and Douglas, Az. / Agua Prieta, Mex. crossing
sites. Improvements to the Nogales crossing site included Border Site
Traffic Studies (including car / tmck inspection lanes), pedestrian crossing
studies for security and control. New road lanc alignments, sign age and
paving. All crossing stations were updated with new station booths and
hardening, security systcms and lighting. Scrvices included Master
Planning, roadway / site civil cngineering and architectural design. Pre
Design Planning with INS and U.S. Border Patrol. PM in charge of
proposal development and all Planning & 1\/E services and submittal to
U.S. General Services [\dministration.
Project & Construction Management for International Clients:
c
Senior Project Manager, Le Groupe Fox LED R&D Labs
Montreal, Quebec Canada $125M
Owner's represcntative PM/CM responsiblc for the design &
construction of thc project. Included the managcment of procurement of
Montreal based dcsign/ engineering firms and construction firms, site
selection, contract negotiations and reporting to the Qucbec governmcnt
funding agency and venturc capital/partners group.
New technology transfer for LED development. Project included a
phascd construction of 40,000 SF Mfg. space with class 1000 clean rooms,
test labs and administrative offices.
Project Design-Build Manager
ST Microelectronics, R&D Facility, Singapore
On-site Program Design / Build Manager for, $60 million High Tech
R&D Facility. Client was a French microelectronics f1nn and the design
team consisted of Italian, French, Singapore and U.S. firms. Build team
involved Singapore, Korcan and Chinese contractors. Responsible directly
to Singapore based plant manager for the on time delivery of the facility.
Provided BD support for further Singapore group based services under a
2 year work visa. Responsible to develop and network with local region
consultants, contractors and vendors.
c
Project Design & CM Manager
Amkor Technology AMK-6 Fabrication Facility, Laguna,
Philippines
On-site Construction/Project Manager for the $110M renovation / re-
tool and expansion of the Test & Assembly Facility project. Responsible
for initial planning & design with U.S. based team and then final design by
Philippine associate ftrm. Korean Owner with U.S. and Philippine
management teams. Provided construction management for owner
contract negotiations and selection of Gapanese contractor). Provided
6
URS
David Wi/son, CCM (contC/.)
c
specialized structural (seismic) studies & design, processing piping, tool
installation planning & phasing and construction cost oversight.
Senior Design-Build Manager
Hyundai, HAS Fabrication Program, Seoul, Korea $3 billion
Senior Design / Build Manager and North I\merican Coordinator for the
Hyundai HAS Fabrication Program. Program included Planning and
construction of 4 new facilities to be constructed in Eugene, Oregon.
Korean portion included coordination of U.S. based design teams
providing planning and design for new DRAM fabrication facility in
Inchon, ROK. U.S. program included management of turn-key D-B team
(U.S., German and Korean design team) and the U.S./German ].V.
Construction team. Each plant was 300,000 SF with 100SF class 10 clean
rooms. Team representative to Korca as project trade represcntative
with Korean vendors and manufactures.
c
Senior Program Construction Manager
GM de Mexico, Engine Plant Expansion, Monterey, Mexico
Program Manager for thc $45 million Plant Expansion. Provided Owncr's
CM oversight of the dcsit,'11 and construction teams involved in the plant
expansion. Hired local Mexican design engineering firms for design
ovcrsight. CM services includcd on site quality control, cost and schedule
oversight reprcscntatives.
Special Training
CCM - Certified Construction Manager, 2005
Licensed Architect Sta te of Arizona #13475 (inactive), 1982
LEED Certified Training for LEED AP 2009
URS Project Management Certification
URS Field Construction Safety ccrtificd
Professional Societies/Affiliates
Cl'vf.A,A Member
Past President, 2006 South Florida CMAA Chapter
-'"
.....
7
C SECTION 4.0
QUALITY ASSURANCE
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07.11
URS Corporation and the Boca Raton (URS) office has developed and has implemented a fully
documented Quality Management System governed by procedures, work instructions, forms, drawings
and other supporting documentation to be used by all departments and/or organizations having direct or
supportive participation in processes affecting the quality of our deliverables. Our Quality Policy Manual
defines the Quality Management System to be compliant to ISO 9001 (ANSI/ISO/ASQ Q9001: 2000) and
regulates all disciplines at all levels within URS. Copies of this Confidential Plan can be made available
upon request. The following discussions present highlights of important components of the plan. The URS
Boca Raton Quality Manager, Mr. William Travis and the individual Scope Project Managers are
responsible for the effective implementation and maintenance of the Quality Management System.
URS Corporate Quality Statement
QUALITY STATEMENT: We are committed to serving our clients, shareholders and
employees by:
c
· Providing Superior Value and Quality Work Products and Services, On-time-
the First Time;
· Implementing a Quality Management System That is Employee Empowered
and Management Driven; and
· Continually Improving Our Quality Management Processes.
Date: May 12, 2010
Signed: Gary Jandegian
President, URS Infrastructure and Environment Division
4.1 DESCRIPTION OF PROJECT QUALITY PLAN ELEMENTS
c
URS Project Deliverable Quality is assured through a documented plan that identifies the applied elements
of the Quality Control/Quality Assurance Program that are applicable to any assigned task. The URS plan
can be modified to address particular task or assignments based on the scope of services to be provided,
however, all contain the several fundamental quality control elements:
4-1 I p 2 g e
URS
C 4.1.1 Quality Planning/Project Control
Project-specific Quality Plans are developed as part of the PMP as necessary, and are an integral part of
the Quality Management System. Project-specific Quality plans are used to define how URS will meet our
client's specific project requirements. Documented procedures describe all planning activities. Quality
plans address required quality activities, acceptance criteria, key stages of project development,
responsibilities and authorities, and documentation requirements.
Documented procedures ensure that all required quality activities have been performed satisfactorily by
qualified personnel prior to the release of the deliverable. Quality activities include Detail Checking,
Independent Technical Review, Drawing/Specification Checking, Coordination Review, Calculation
Checking, or other reviews or checks as deemed necessary by the Project Manager or Quality Manager.
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
4.1.2 Deliverable QAlQC key activity of the Project Quality Assurance Program during the Deliverable
Development process is the performance of required Detailed Checking of the data input and deliverables
and the performance of Independent Technical Reviews of deliverable work products.
c
IE
Quality Management System
Volume 3
Qualify !nqruntnn~
Provides details 011 how Cl'II.1in ,llliol1s
must hr jlrrforrnf'cf
Volume 4
QUi:llity f urm~
!linVille'') ltJfm\
;lIld templates
. URS Policies
& Prcedures
~
Other Resources
.----
~~
~/ . "Best
I practices" guidelines
i . Sample PXPs. POPs.
( plans and procedures
\ . Industry guidelines
\
Project-level
Resources
P,ojf'ct (:'t'(urion Plan
An inlrrnal plan to rX(>futr all assilJllllwllt
.l((Ording 1(1 client or lIRS H'quirl'lll('IlIS
P'o;~rl OUdllly Pidn
Deiailed. standalone Qualitr plan prepared
10 supplelllrflllhp PXP
ProjH! Man3gement Plan
Drlililt'd 1IJ,11l.ltjPIIlPIII plan Ofll'fl H'lllllft'd
by clil.'lIb lor IJrgl' CM/PM and olhe,
itSS;flnl1lents
PMP
Project.Specific Procedures
Del.it~d Pruj~<t Sp~(!f1(
PnUf'dU'f'5
PrU(l'dl"l'~ 111.1: dl'~OI"(l hOt':
CE'rt,)jn proje(t-~pt'cifJ( tasks or
services will oe done
c
4-2 I p 2 g e
URS
c
r
~
/""'
~
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
Design Team Responsibilities - Each member of the project Team is required to comply with
documented QAP procedures. At specific milestones identified at the beginning of each assignment, QA
reviewers will be required to document the review comments, sign-off on completion of the deliverable(s),
and place a record of the review in the project's quality review records file.
· Project Reviews - Prior to submittal of major deliverables, the QA reviewer will conduct an
independent overview of the plans and calculations. This is in addition to routine QC check
reviews that are conducted throughout the design process. Work that does not meet internal quality
standards will be noted and changed accordingly. Subsequent to the reviews, the Project Manager
will prepare documentation recording the basis of the reviews, the specific items that were
reviewed, the findings of the review, and any follow-up required.
· Detail Checking - Detail checking is a quality control procedure whereby all technical analysis and
technical assessment and other information of a produced deliverable is checked and verified for
correctness, completeness and checked for technical accuracy. The checking is normally
performed by Senior Professionals who are independent from the originator of the document to be
checked, but part of the project team as assigned by the Project Manager. Data checking may be
performed by more junior more cost effective staff.
· Independent and Technical Reviews - All substantive work performed or identified as a
significant deliverable, will undergo an Independent Technical Review (ITR). Independent
Technical Reviews are intended to assure that the technical approach, testing and work products
are consistent with the City's and industry approaches and practices and that proper analytical and
evaluations have been performed to technically support the evolved work product. Senior technical
personnel, not directly involved in the work product preparation process will perform ITRs. In many
instances, these personnel may be brought into or engaged from other URS offices distant to the
project to assure their reviews are independent from the work product evolution process and
activities. ITRs can be performed as part of the detailed deliverable process and/or can be
performed as part of any Value Engineering process.
4.1.3 Document and Data Control
Documented procedures are in place describing the preparation and control of documentation within the
Quality Management System. The procedure defines the controls for:
· Approving documents for adequacy prior to issue
· Review, update and re-approval of documents
· Change control and the current revision status of documents
· Accessibility of relevant versions of applicable documents
· Legibility and positive identification of Quality Management System documentation
· Prevention of the unintended use of obsolete documents
4-3 I p 3 g E
URS
c
/'"
~
c
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
A project file system is set up and maintained in a central office location. The project file will contain all
original hard copy and digital project documentation in accordance with local office procedures.
4.1.4 Control of Quality Records
Quality records provide evidence of conformity to the requirements, and effective operation of the Quality
Management System. A documented procedure exists which defines the controls needed for the
identification, storage, protection, retrieval, retention times and disposition of quality records.
4.1.5 Procurement Quality
Subconsultant and subcontracted services are all evaluated based on subcontractor's technical expertise
and proven ability to meet contractual requirements. Purchasing/contractual documents shall contain data
clearly describing the product or service ordered, including scope of work, technical requirements,
professional liability, qualifications of personnel, Quality Management System requirements. Procedures
are in place that requires procured services to be verified. The procured service must meet contractual
requirements. The type and extent of verification shall be dependent upon the type of service, historical
performance or current status of the supplier/subcontractor.
4.1.6 Control of Monitoring and Measuring Devices
URS maintains procedures for the control, calibration and handling of inspection, measuring and test
equipment (including test software, where applicable). All inspection, measuring and test equipment used
to perform analysis and testing for clientele shall be included in the program. Equipment shall be calibrated
according to manufacturer's calibration specifications and procedures (if available); otherwise documented
calibration methods shall be established according to manufacturer's specifications.
4.1.7 Internal Audits
URS conducts internal audits of selected projects at planned intervals to determine whether the Quality
Management system conforms to the planned arrangements, and that it has been effectively implemented
and maintained. The purpose of the audits will be to verify that proper procedures, detailed checking,
Independent Technical Reviews and document control activities are being followed and performed in
accordance with the Project Management and Quality Assurance Plans. Trained auditors are responsible
for the planning, reporting and follow-up activities of the internal audit. All audit findings become
documented non-conformances or corrective actions requiring corrective actions.
4.1.8 Corrective/Preventive Action
A documented procedure is in place that describes the corrective action process when deficiencies are
uncovered during internal audits. URS makes every effort to eliminate the cause of nonconformities, and
potential nonconformities, in order to prevent their recurrence. Corrective actions may include physical
correction of the noted deficient item followed up by re-training of staff in the proper procedural process.
4-4 I Peg E-
URS
C 4.1.9 Continuous Improvement
URS constantly seeks ways to continually improve the effectiveness of the Quality Management System
through the use of quality objectives, audit results, analysis of data, corrective and preventive actions and
Management Reviews.
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
4.1.10 Client Satisfaction Feedback Reviews
The Project Manager or Client Services Manager shall initiate periodic Client Feedback Satisfaction
reviews with the City Project Manager and other City staff as appropriate. The purpose of this review will
be to solicit City feedback at upper office Management Levels regarding contract performance or other
issues requiring attention by senior URS management.
r'
.....,.
c
4-5 I P 2 g e
URS
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
C SECTION 5.0
APPROACH AND METHODOLOGY
c
c
Our approach, rationale and methodology to successfully providing professional engineering and project
construction management services is based upon fundamental URS corporate principles and philosophies
guiding our engineering design, construction support and administrative practices. URS has a
demonstrated history of proven successes in achieving project scope, schedule, cost and quality
objectives that is accomplished by providing an experienced and qualified team supported by the full suite
of technical skills, analytical tools and corporate oversight that can deliver technically correct, timely and
cost effective work products and completed construction projects for each assignment.
5.1 GUIDING APPROACH PRINCIPLES AND PHILOSOPHIES
Our guiding principles and philosophies to our approach include following:
· Be guided by the City's needs and goals for the overall project assignment scope, deliverable
schedule, funding constraints and prerequisite level of quality,
· Fully Understand the City's expectations and develop management, technical and deliverable
work plans to address and meet these expectations,
· Follow the City's processes, guidelines and procedures so that engineering and construction
projects are completed in compliance with accepted guidance criteria and City directives,
· Furnish superior technical knowledge and experienced personnel in all the required technical
discipline and support engineering fields required of this RFP,
· Provide strong OAfOC to assure a quality, technically correct and accurate deliverable project,
· Provide strong project management and priority service with dedicated staff capable of
recognizing the City's administrative requirements and needs for scheduling, cost tracking,
reporting and invoicing; working closely with the City's personnel,
· Work as a seamless extension of City staff in dealing with the general public, landowners,
stakeholders as well as other internal City staff,
· Apply our extensive experience gained from outreach to landowners, stakeholders and
regulatory agencies in dealing with complex land, access and right of way issues involved with
construction projects,
· Utilize proven experience and documented procedures to expedite the attainment of federal,
state and local permits. As an example of our expertise in the permitting arena, URS developed
and published FOOT's current standard procedure for expediting PO&E permits for complex
roadway projects,
· Utilize standard industry cost data to provide comprehensive and accurate cost estimating.
· Provide comparative cost estimating and value engineering cost benefit analyses where
needed for alternative design reviews and selection processes.
Using these overriding principles and philosophies, integrated into a team approach, URS has developed
and provided a wide range of professional services for projects for both public and private clients and we
will be able to administer the work to help the City of Sunny Isles Beach achieve its goals.
5-1 I P c !2 e
URS
c
City of Sunny Isles Beach: Special Inspection Services
RFQNo.11-07-11
5.2
PROJECT MANAGEMENT CONTROLS
URS recognizes the importance of well-defined and competently
administered project management system for the successful and
timely execution of the project within the City's technical, schedule,
budget and quality objectives. To meet these needs, URS has
developed and implements for each project a client prioritized and
focused project management approach, supported by a timely
detailed cost management system which utilizes URS industry-based
software to provide the framework and control to successfully
manage this contract and associated work tasks. Key components of
our project management capabilities include:
c
· An organizational structure that meet the unique requirements of each specific project.
· Project schedule, budgets and staffing plans identified in a Project Management Plan (PMP)
and project specific plans that initially identifies and establishes project baseline controls against
which project or task progress is measured, evaluated and reported to the City.
· Internal Management processes for monitoring and controlling the project, and
· Proven techniques to effectively communicate project or task progress and results to the URS
project team, the City and the QA independent technical review team.
· Implementation of a Comprehensive OA/OC Program that assures that project deliverables are
clean, complete and technically correct so as to minimize risks to the City resulting from
unforeseen construction phase claims.
Our proactive management approach will establish clear lines of communication between the City and
within the project team, provide well defined areas of responsibility for each work task and work activity,
allocate and update URS Team resource needs and provide a professional experienced project
management team to ensure the control of each work activity.
This management approach includes integrated planning, designing, scheduling, communication protocol,
quality control and cost control systems based on an overall Project Management Plan for the contract.
5.3 PROJECT MANAGEMENT PLAN PREPARATION
Project Management Plan
To facilitate project organizational control and communication, URS will initially prepare and implement a
documented Project Management Plan (PMP) for this contract. The plan will contain the following items:
c
· City Information and Contacts
· Project Organization Chart
· Work Plan Development Process(es)
· Design Development Process(es) (As Applicable)
· Communications Protocols w/City Staff, Subcontractors and External Entities
· Performance Monitoring Protocols and Controls
5-2 I :; :0 g e
URS
c
c
c
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
.
Progress Reporting Requirements
Contracting and Control of Subcontractors
Project Quality Assurance/Quality Control Processes
Independent Technical Review Requirements
Project Documentation Control/Retention
Project CAD Standards
Work Products/Deliverables and Deadline Dates
.
.
.
.
.
.
This Plan then becomes the baseline Project Management Control document providing organizational
control, guidance and information for implementation of the various Work Orders to be assigned to URS
during the duration of the contract.
Project specific PMPs will be refined to establish budget, scope, and schedule, and identify
interactions with the City staff, within URS and with required contractors as well any outside agencies
or other client identified entities. The Plan documents and describes the individual work tasks,
subconsultant assignments and identifies the sequence of activities associated with successfully
completing the work within the projects scope, schedule, budget and level of quality objectives. The Plan
will clearly identify work activities to be executed by URS, our subcontractors as well as the interrelated
coordination activities with the City.
Proiect Communication and Coordination
URS recognizes the need for and importance of frequent and open communication with City staff as well as
effective communication with the design team members. URS will utilize a communication protocol,
which utilizes the project manager as the primary point of contact for the project. All formal
contractual communication to the City would flow through this point of contact. Day-to-day contact on
technical matters however, may also Occur at the project technical lead levels between URS staff and
project design consultants already engaged by the City.
To facilitate communication and coordination with the City and design team members, frequent scheduled
meetings with Staff will be proposed to monitor and report on the status of the work and to coordinate other
issues such as management and scheduling critical to each task. Periodic meetings with senior URS
and City management will be requested to obtain feedback on overall URS performance as a client
satisfaction and wellness check.
URS fully understands, and appreciates the need to perform as a seamless extension of City staff in
representing and providing information to entities outside of the City. URS also recognizes that the City
staff and design consultants also has considerable knowledge, experience and capable professional
staff with valuable knowledge and background applicable to all City projects. URS views and
considers the City staff to represent a key and critical team member to the successful implementation
and completion of any particular project assignment.
It is important that the City staff be an active participant in the work implementation process with design
consultants. Our approach is to utilize a "technical outreach" philosophy with the City staff and
project design consultants by scheduling initial design review workshops, attending monthly meetings,
and subsequent periodic Deliverable Development Reviews at predetermined levels with City Staff.
5-3 I ? (' S e
URS
City of Sunny Isles Beach: Special Inspection Services
RFQNo.11-07-11
c
The URS Team will provide technical data, preliminary analysis and work products with focused
communications to:
· Exchange technical data, analyses and analytical results
· Develop a regular forum for exchange of technical information and reviews
· Solicit City staff and project design consultant experience and background knowledge
on "what has worked" and "what has not worked" for various aspects or components of the
work order
· Identify and Track work order progress issues and their resolution
· Provide periodic meetings for technical Team/City coordination
The Technical Outreach Program is considered to be a critical and highly important aspect to achieve the
City's objectives with each individual sub-design within the overall contract. This approach has the distinct
advantage of soliciting and incorporating URSs and the City's knowledge, experience, expertise and input
into the design development process. Our goal is to provide deliverables that are concise and technically
acceptable to the City staff as well as to the regulatory agencies.
Subconsultant Manaqement
As prime designer and project program manager, URS knows that the City will expect no less from
URS than they do from their subconsultants. The high standards we set for our internal design efforts
will be utilized to evaluate existing designs so that bid documents meet or exceed City requirements.
Subconsultant qualification is normally based on the following criteria:
c
· Technical expertise in require discipline
· Ability to perform assigned scope and meet project
milestones
· Proximity to the anticipated work site(s)
· Reasonable cost estimate
· Small Business Enterprise (SBE) status
Frequent
Su bconsultant
Communication and
Progress Review is
Critical to Timely
Preparation of
Quality Deliverables
URS will be responsible for overall subconsultant management, administration, and reporting of progress.
Reporting requirements, communication requirements, quality assurance, and cost and schedule control
would be implemented through URS. Subconsultants and their staffs will provide interim technical
deliverables, progress reports, and draft and final technical reports on a routine basis as required by
the City and any particular work assignment. Subconsultant technical deliverables will be submitted to
URS technical design staff for review and comment just as our internal technical deliverables are subjected
to QA review, prior to incorporation into final deliverables to the City for bidding purposes.
c
In the course of any work authorization, subconsultants will be required to
immediately notify the URS project manager of any anticipated change in
scope of work, costs, or schedules. This notification must be in writing and
will be forwarded to the City within 24 hours of receipt. All requested
changes must first be approved by the City project manager and then
executed by written authorization of the URS project manager and City of
Sunny Isles Beach Procurement Department.
I Early Identification of
Problems and Resolution
Processes are a Key
Factor to Responsible
Subcontractor
Management
"l
5-4 I p 2 g e
URS
c
c
c
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
5.4
CONSTRUCTION ADMINISTRATION
The most successful construction projects start with good planning and coordination. URS will
approach each project, by scheduling early meetings involving the contractor, design engineer, necessary
subcontractors, City staff, utility companies, regulatory agencies and others associated or impacted by the
project. Before each major work item begins, the project manager will meet with our field inspection staff to
discuss day-to-day operations and the importance of quality. URS will hold weekly staff meetings to
review the contractor's two-week look-ahead schedule and discuss staff assignments for the next
week.
Good planning must continue throughout the project duration. In the past we have found that these
meetings when handled in a proactive manner, build a relationship between those involved,
establish a line of communications at the lowest level, and are the beginning of a trust and
partnering between all involved in the project design and construction.
The URS Team is totally and faithfully committed to serve as City's advocate and representative for this
contract. Our project team has a proven, take-charge, solve-it-now, solve-it-here attitude. We are
committed professionals and will be completely dedicated to the successful on time and within budget
completion of any assignment. URS desire and intent is to identify issues or problems early and to develop
a resolution with the Contractor before any work was started. The proactive early identification and
resolution of issues keeps problems and the potential for claims to a minimum.
URS absolutely will not broker independent decisions of a cost impact nature to the City. The City
will always have our recommended solution and anticipated cost impact to any problem that arises before it
is discussed with the contractor. Where alternative approaches to construction are possible, the pros and
cons of all alternatives will be reviewed and our recommended action given promptly to City. We consider
this an absolutely essential element of the timely and cost-effective completion of construction projects.
The URS team has an outstanding group of seasoned local professionals with strong major bridge design
and construction experience. URS will mobilize special inspectors or their designated field
representatives to the project when needed, and remove them from the project when not needed.
Our project and construction managers and designated special inspectors are licensed Florida
Professional Engineers. Also, the lead inspectors will have FOOT, American Concrete Institute and
Earthwork CEI Certificates as appropriate, to continuously maintain and update their knowledge on
applicable codes and testing practices.
5.5 PROJECT ADMINISTRATION TO MEET PROJECT FUNDING AND TIMELlNE CONSTRAINTS
URS administrative procedures provide a system to monitor project costs and progress to enable the
project manager to evaluate the timeliness and cost effectiveness of the progress of the work. The basic
element of the management control process in the URS Loaded Cost Summary Reports (LCSR), a URS
developed and proprietary, computerized Management Information System (MIS) for financial management
and control of projects. The LCSRs are designed to assist the Project Manager control the scheduling,
technical, manpower, and financial aspects of their project. The system provides the Project Managers
5-5 I :; ;:; ~ Q
. ~. E '-
URS
c
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
with real time financial information. Financial information for a particular week (through Friday) is available
the following Monday. The system supplies the following information on a weekly basis:
· Project personnel working on the task
· Office location
· Hours billed for that week, by task, and accrued cost/hours-to-date
· Labor amount expended
· Equipment costs expended
· Direct (non-labor) expenses
· Total task and project expenditures
The LCSR system monitors the use of budget items and costs and keeps track of the projects account
balance. The system assists in early identification of problem areas so that the management team can
implement timely and cost-effective solutions, or corrective measures, as required.
5.6 SCHEDULE CONTROLS
c
Scheduling provides the framework for effective project management by logically combining the scope,
schedule and budget together. The firm utilizes industry-standard scheduling software (Microsoft Project,
Primavera Project Schedule) to identify and monitor program activities, cost and schedule. URS most often
utilizes the Primavera Scheduling software to establish the project construction schedule for various clients
using the Critical Path Method (CPM) to identify the most efficient completion path.
In using the CPM approach, URS will identify all major activities and deliverables on the schedule.
Deliverable submittal dates and major project events are classified as project milestones. The activities
required to meet these milestone dates are identified and logically scheduled to support their achievement.
Two areas of particular importance are the identification of all applicable review and comment cycles, and
the consideration of all external constraints put on the schedule by third parties for which there may be little
or no control with respect to their performance, but that have a significant impact on project progress.
The vast majority of our projects are completed on schedule and within budget. When projects are delayed,
it is typically due to unforeseen circumstances. Modifications to project budgets are only requested when
there is clearly a change in project services.
The capability to meet deadlines is determined by 5 factors:
· Project Management Plan - Our standard practice for all projects is to develop a Project
Management Plan at the start of each project assignment that includes identified Task
Managers, a detailed scope of work and a schedule for each work task, as well as
communications, progress reporting and coordination protocols for avoiding problems between
tasks.
· Knowledge and Experience of the Project Team - We have selected and will assign Project
Team members who are well qualified for their assignments, have the necessary experience in
similar projects, and are interested and committed to their assignments.
· Availability of the Project Team Members - We have examined our current and anticipated
C workload commitments over the period anticipated for the project and have confirmed that the
5-6 If:.;:; ;: c
URS
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07.11
c
staff members we propose to assign have sufficient time available to properly execute any
assigned work.
. Availability of Supplemental Staff - Our staffing approach for projects always includes
assessments as necessary to provide back-up staffing for all key leadership and technical
discipline functions.
· Strict adherence to Budget and Sub-deliverable Deadlines - Our standard practice is to
develop a series of sub-deliverable progress deadlines and then to measure their progress
against a pre-established budget. This process allows us to make adjustments during the in-
progress work to assure compliance with formal deliverable submittals and deadlines.
URS can provide schedule, cost and performance analysis at various levels of detail and sophistication.
These range from developing a simple Gant Bar Chart to utilization of industry standard project
management scheduling software. Programs such as Time Line, Microsoft Project, or Primavera (P3)
software are available for use on this contract as required. Several personnel in the local Boca Raton office
are Primavera (P3) software trained and certified.
Construction Phase Scheduling services consists of three main tasks:
c
. Review of good baseline schedules should be reviewed to ensure that they conform to
contractual requirements. They shall represent a complete project scope, reasonable activity
durations, and proper logic ties. Schedules should not have unnecessary constraints or
sequestered float. Cost-loaded schedules shall have reasonable costs and resource loading
when these items are utilized. URS baseline schedule reviews often times require detailed
back and forth discussions with the contractor's scheduler to ensure a proper baseline
schedule is provided. All issues must be resolved before the baseline schedule can be
accepted.
. Review of monthly progress schedules are reviewed in much the same way. Primavera
P3e, including Claim Digger software is used to document any changes. This software
compares the monthly submitted schedule update against the previously approved schedule to
ensure that any changes to activities, durations, logic, constraints, etc. are documented.
Activities are reviewed for work completed, work in progress, items behind schedule, major
problems, logic revisions, etc. and a monthly narrative should be provided. Actual progress is
verified with field staff, site walkthroughs, and daily reports and compared against the recorded
progress in the monthly schedule update. Any issues in dispute are addressed and resolved
before the schedule is accepted. Resolution of monthly schedule issues is often a time critical
task since it is usually contractually mandatory to have an acceptable schedule update before
making monthly progress payments. We understand the importance of resolving schedule
issues so we often work with the general contractor's scheduling staff on a time critical basis to
maintain the project progress.
· Review of revisions and delay schedules often affect specific activities that must be
discreetly analyzed. Schedule revisions may be generated because of out of sequence
progress or delays or simply to correct a previously undetected error. Any delay issues must
be properly inserted into the logic in a way that accurately depicts the nature of the delay.
~
'--"
5-7 I P " g e
URS
c
r'
'-'"
c
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
URS claims review experience includes a wide variety of project types and types of claims made by
contractors today. We have provided support to owners in the form of forensic scheduling,
documents preparation and review, expert witness testimony I depositions, eminent domain
valuations, and damages and delays assessments. Additionally URS can provide supplemental staff
support on an as needed basis to the field CM team for pay request and change order reviews.
5.7 BUDGET CONTROLS
URS maintains rigorous internal administrative procedures and systems to monitor the labor utilization and
financial expenditures of each project. The internal systems enable the project manager and their
administrative assistants/billers to evaluate the timeliness and cost effectiveness of technical progress on
any authorization. The basic element of the management control process is the URS Enterprise One
(EPO), a proprietary, computerized Management Information System for financial management and control
of projects. The EPO is designed to assist the project manager in control of the scheduling, technical,
manpower, and financial aspects of their project.
The system provides the project managers with real-time financial information. Financial information for a
particular week (through Friday) is available the following Monday. The system is in place at all URS office
locations worldwide and supplies the following information on a weekly basis:
· Project personnel working on the task
· Office location
. Hours billed for that week
· Task and accrued cost/hours-to-date
. Labor amount
· Equipment costs
· Direct expenses
· Total expenditures
Standard summary documents produced by the EPO include the Weekly Job Detail Report and the Weekly
Job Summary Report. These reports are two of several financial reports that can be produced as a
function of the specific requirements of the project. The Job Summary Report, a detailed report issued on a
weekly basis, contains "to-date" labor charges, expense charges, equipment charges, to-date budgets, and
budget-to-actual comparisons. Charges are summarized by operation, with a subtotal by increment and an
overall job total. Only operations that have current charges are printed. The to-date amounts are displayed
by type (labor, expenses, and equipment) and summarized.
The abovementioned EPO will be utilized to monitor all City projects on a weekly basis. Any cost reports
requested by the City will be provided. The EPO will also publish clear and concise invoicing.
5.8 COST ESTIMATING CONTROLS
Consistent with URS' previous experience on major design and construction projects, it is common for cost
estimates to be developed during the various phases of the design and construction work, particularly for
larger sized projects, in order to be able to plan for, budget and control the project's construction cost. URS
58In_,-~
- r-- -:: c; t:
URS
c
c
c
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
is able to accurately estimate the cost of the work, modify design as needed while working in conjunction
with the City needs. URS objective will be to assure that the final design product is within the initial
construction cost budget established by the City.
URS will prepare, as requested, detailed opinions of construction costs reports either during the
design or construction phases of the project based upon the various completion schedules for the work.
Typically, opinion of construction costs can be and have been provided by URS at any of the following
deliverable milestones:
Opinion of Costs Deliverables:
· Conceptual or Basis of Design Report
. 30% General Design Report (Preliminary Design Phase)
· 60% Detailed Design Report (Design Development Phase)
· 90% Final Design Submittal (Pre-final Design Submittal)
· 100% Final Design/Construction Bid Documents
· Construction Phase in Response to Design Change Requests
· Construction Phase in Response to Construction Claims Evaluations
For small to medium projects, the conceptual, 30% and 60% submittals are not typically required and the
estimate is based on the 90% design submittal. The URS Team shall use a clear and concise
estimating formats that depicts in detail the breakdown of the job, unit costs, quantity take offs and all
markups applied to the costs. The URS Team will review unit costs of any prior-constructed projects in the
City records and local construction market factors in the preparation of the detailed opinion of costs. An
appropriate contingency, developed in consultation with the City's Project Controls Division, shall be
applied to the cost estimate.
The URS Team shall compare each cost estimate with the prior opinion of cost to identify and account for
discrepancies. Each cost opinion shall be reviewed with the City PM and appropriate City staff to
discuss assumptions used and results.
Estimates will be prepared using City-approved estimating software allowing for various formats and
organization of the output to accommodate city project controls, project management and construction
administration staff needs. As required, detailed recommendations will be made for corrective design
actions and modifications, including such things as alternative design recommendations, to keep
the project on track with the City budget/funding allocations.
5.9 COMPLIANCE WITH APPLICABLE CODES AND PERMITS
The URS group of construction engineers and inspectors has local experience and background with federal
and local environmental permitting and compliance monitoring. Compliance with applicable permit
requirements will be evaluated, documented, and corrective actions identified prior to and during
construction to ensure permits compliance issues do not impact project construction and project
implementation. URS would lead these permit expediting efforts by developing and maintaining a project
permits status file/matrix to track the expiration dates and advise the City of the need for any necessary
permit extension in a timely manner.
5-9 I P 2 g (CO
URS
c
c
c
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
5.10 SAFETY COMPLIANCE
URS understands that for a project to be successful it must be completed without injury to any
member of the construction team (CITY, CEI and Contractor) or any customer. URS also understands
that it is not the responsibility of the construction management to enforce the Contractor's safety program;
however, it is URS policy that all construction team members shall work in a safe environment. If
necessary, we will refrain from putting our team members in construction environments where serious
safety concerns or issues exist. We will partner with the Contractor to discuss safety concerns at our
weekly meetings. URS will take care to guard against any unsafe conditions that might threaten motorists
and pedestrians who continue to use the facilities during construction. URS will bring such conditions to the
attention of those responsible for their resolution in a timely manner. In the final analysis, construction
safety is everyone's responsibility.
5-10 I Peg z::
URS
City of Sunny Isles Beach: Special Inspection Services
RFO No. 11-07-11
c
SECTION 6.0
REFERENCES
Presented below is contact information for the select individuals who have managed URS / EC Driver
bridge/construction management projects.
Jeff Williams
FDOT District 2
386.937.7104
Frank Ferrano
City of Wellington
561.791.4008
Betsy Jeffries
FDOT, District 4
954.777.4061
Peter Nissen
,- FDOT, District 4
~ 954.868.7231
Patrick D. Byers
Solid Waste Authority of Palm Beach County
561.640.4000 x4611
,-..
~
711')-'~-
- . 0 c '::
URS
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
C SECTION 7.0
SCHEDULE
RFQ, Section 2.3 states, "This contract shall commence upon the date of issuance of a the Notice to
Proceed (NTP) from the City Manager or his designee and shall remain in effect until such time as the
commodities, equipment and/or services acquired in conjunction with this Request for Qualifications have
been completed and accepted by the City's authorized representative and upon completion of the
expressed and/or implied warranty periods. The proposer shall include the time necessary to complete
this turn-key project from permitting to final close-out."
URS will work in association with the City and approved general contractor(s) and provide the necessary
construction administration, special inspections, geotechnical, testing and consulting services for this
contract on an as-needed basis. Our team will begin work immediately upon receiving our Notice to
Proceed and we perform services in accordance with City's directives and the approved contractor's
construction schedule until final close-out of both projects.
-
~
,-..
~
7-1 I [) C f' '0
URS
---
....
,...,
DELIVER TO:
City of Sunny Isles Beach
City Clerk
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Request for
Qua Iification s
SECTION 6
RTO C;IIRMTTT41 Fn~MC;
OPENING: 3:00 P.M.
07/15/2011
PLEASE QUOTE PRICES F.O.B. DESTINATION, LESS TAXES, DELIVERED IN
CITY OF SUNNY ISLES BEACH, FLORIDA
NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Bid price should be
less all taxes. Tax Exemption Certificate furnished upon request.
Issued by:
Purchasing Agent
Date Issued:
07/01/2011
This Bid Submittal Consists of
Pages 30 through 33
Sealed bids are subject to the Terms and Conditions of this Invitation to Bid and the accompanying Bid
Submittal. Such other contract provisions, specifications, drawings or other data as are attached or
incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the
address shown above until the above stated time and date, and at that time, publicly opened for
furnishing the supplies or services described in the accompanying Bid Submittal Requirement.
IFB 11-07-01
SPECIAL INSPECTION SERVICES, INCLUDING GEOTECHNICAL / CONSTRUCTION
ADMINISTRATION
A Bid Deposit in the amount of 0% of the total amount of the bid shall accompany all bids
..... A Performance Bond in the amount of 00/0 of the total amount of the bid will be required upon execution
of the contract by the successful bidder and City of Sunny Isles Beach
....
Procurement Aaent:
Marcanthony Tulloch
Firm Name:
URS Corporation Southern
Commodity Code(s):
RETURN ONE ORIGINAL AND TWO COPIES OF BID SUBMITTAL PAGES AND AFFIDAVITS
FAILURE TO SIGN PAGE 33 OF SECTION 4 BID SUBMITTAL WIll RENDER YOUR BID NON-
RESPONSIVE
'....
PAGE 30 OF 34
BID No. 11-07-01
"
.
'-"
c
".....
'--'-
SECTION 6
BID SUBMITTAL FOR:
ACKNOWLEDGEMENT OF ADDENDA
INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES
PART I:
LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN
CONNECTION WITH THIS BID
Addendum #1, Dated
7/11/11
Addendum #2, Dated
Addendum #3, Dated
Addendum #4, Dated
Addendum #5, Dated
Addendum #6, Dated
Addendum #7, Dated
Addendum #8, Dated
PART II:
o NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID
FIRM NAME: URS Cor
Southern
DATE: 7//'7 )//
AUTHORIZED SIGNATURE:
TITLE OF OFFICER: V.F., Manaqer of Enqineering/Geotechnical
Design Services
PAGE 31 OF 34
610 No. 11.07.0t
c
BID SUBMITTAL FORM
Bid Tille: SPECIAL INSPECTION SERVICES, INCLUDING GEOTECHNICAL / CONSTRUCTION
ADMINISTRATION
The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of
Sunny Isles Beach in the form included in the Contract Documents to perform and furnish all Work as specified or
indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in
accordance with the other terms and conditions of the Contract Documents.
The Proposers accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to
Proposers, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject
to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and submit the Agreement with
the Bonds and other documents required by the Bidding Requirements within ten days after the date of the City's
Notice of A ward.
In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that:
. The Proposer has familiarized himself/herself with the nature and extent of the
Contract Documents, Work, site, locality, and all local conditions and Law and
Regulations that in any manner may affect cost, progress, performance, or
furnishing of the Work.
,......
'-"
. The Proposer has studied carefully all reports and drawings of subsurface
conditions and drawings of physical conditions.
. The proposer has obtained and carefully studied (or assumes responsibility for
obtaining and carefully studying) all such examinations, investigations,
explorations, tests and studies which pertain to the subsurface or physical
conditions at the site or otherwise may affect the cost, progress, performance, or
furnishing of the Work at the Contract Price, within the Contract Time and in
accordance with the other terms and conditions of the Contract Documents, and
no additional examinations, investigations, explorations, tests, reports or similar
information or data are or will be required by proposer for such purposes.
. The proposer has given the City written notice of all conflicts, errors,
discrepancies that it has discovered in the Contract Documents and the written
resolution thereof by City is acceptable to the Proposer.
. This Bid is genuine and not made in the interest of or on behalf of any
undisclosed person, firm or corporation and is not submitted in conformity with
any agreement or rules of any group, association, organization, or corporation;
the Proposer has not directly or indirectly induced or solicited any other
Proposers to submit a false or sham Bid; the Proposer has not solicited or
induced any person, firm or corporation to refrain from Bidding; and Proposer
has not sought by collusion to obtain for itself any advantage over any other
Proposers or over the City.
The Proposer understands and agrees that the Bid is for unit prices to furnish and install individual Work
Items for maintenance and/or repair work, complete in place. Estimates are provided for the purposes of
,.-....
~
PAGE 32 OF 34
BwNo.ll-07-01
c;
c
c
Bid Evaluation and to establish unit prices for individual Work Items for maintenance and/or repair work
to be contracted by the City under individual Purchase Orders, based on the unit prices established under
this Bid.
The City and the successful Proposer will establish completion times for each individual Work Item and
the successful Proposer agrees that the work will be completed within the time frames agreed upon and
stipulated in the individual Purchase Orders and/or Notice to Proceed.
FIRM NAME:
URS Corporation Southern
3343 West Commerical Boulevard, suite 100, Fort Lauderdale, FL 33309
Street Add ress:
Mailing Address (if different):
Telephone No. .--9.54.739.1881
Fax No. 954.739.1789
Email Address: Thomas F Mullin@urscorp.com FEIN No. ~_PL- ...1:.../Qj_'E.J~_/~2
* "BY SIGNING THIS DOCUMENT THE BIDDER AGREES TO ALL TERMS
SIGNATURE: ~ r lJIL IE If)
(SIGNATURE OF AUTHORIZED AGENT) (-;
PRINT NAME: Thomas F. Mullin, PE
Vice President /
TITLE: Manager of Engineering/Geotechnical Design Services
THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND
BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE
BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON-RESPONSIVE. THE CITY
MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED
DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER.
PAGE 33 OF 34
810 No. 11-07-01
c
c
c
PAGE 34 OF 34
BID No. 11-07-01
~FFIDAVIT -
OF SU~
c
c
c
NON-COLLUSION AFFIDAVIT
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
STATE OF FLORIDA )
COUNTY OF Palm Bea5h
The undersigned being first duly sworn as provided by law, deposes, and says:
This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be
relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid.
The undersigned is authorized to make this Affidavit on behalf of,
URS Corporation Southern
(Name of Corporation, Partnership, Individual, etc.)
a,
Corporation
(Type of Business)
, formed under the laws of California
(State)
of which he is Vice President, Manager of Engine~ring/Geotechnical Design Services
(Sole Owner, Partner, President, etc.)
Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the
undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any
department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein.
This Bid is genuine and not collusive or a sham; the person, firm or corpora'tion named above in Paragraph 10.2 has not colluded, conspired,
connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid, or that such person, firm or
corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication
or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in
the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph
10.2, has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or
to any member or agentFj;th_eremof. wf-/t'r-"
~ Thomas F. Mullin, P.E.tv,A
Manager of Engineering/Geotechnical Design Services
AFFI T'S NAME AFFIANT'S TITLE
-te.
TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this 11- day of ~
Personally Known /' or Produced Identificalion .;
Type of identification AI/ A
. I
, -ree:..Zo II .
(Affix seal here)
-
-
-
-
- --
. """","
~ !i,IO~I'~.J:~ :a~~~~S~::~; ~W f~~lli'Hot~i .
I IPIJCJt:lIO IlIlS . :Il1qnd ~JlIlON ;., E
)ll:lVJ.S A311:11HS ~,,z~,"'d A~,";l
'u.n'
----~
..... --
-,
1 of 7
DECEMBER 28 2010
(;
PUBLIC ENTITY CRIMES
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
PUBLIC ENTITY CRIMES
Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate
who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a
Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a
public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of
real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or
Consultant under a Contract with any public entity, and may not transact business with any public entity in excess
of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on
the convicted vendor list".
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER
OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
11.1. This sworn statement is submitted to City of Sunny Isles Beach
by
Mana er of Engineering/Geotechnical Design
Services
for URS Corporation Southern
c
whose business address is:
3343 West Commerical Boulevard, suite 100, Fort Lauderdale, FL 33309
and (if applicable) its Federal Employer Identification number (FEIN) is 59-2087895
(If the entity had no FEIN, include the Social Security Number of the individual signing this sworn
statement: .)
11.2. I understand that a "public entity crime" as defined in Paragraph 287 .133( 1 )(g), Florida Statutes, means a
violation of any state or federal law by a person with respect to and directly related to the transaction of
business with any public entity or with an agency or political subdivision of any other state or with the
United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any
public entity or an agency or political subdivision of any other state of the United States and involving
antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation.
11.3. I understand that "convicted" or "conviction" as defined in Para. 287133(1 )(b), Florida Statutes, means a
finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any
federal or state trail court of record relating to charges brought by indictment or information after July 1,
1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere.
11.4. I'understand that an "affiliate" as defined in Para. 287.133(1 )(a), Florida Statutes, means:
a.) predecessor or successor of a person convicted of a public entity crime; or
b.)
Any entity under the control of any natural person who is active in the management of the entity
and who has been convicted of a public entity crime The term "affiliate" includes those officers,
directors, executors, partners, shareholders, employees, members, and agents who are active in
the management of an affiliate. The ownership by one person of shares constituting a controlling
interest in another person, or a pooling of equipment or income among persons when not for fair
2 of 7
c
DECEMBER 28. 2010
c
market value under an arm's length agreement, shall be a prime facie case that one person
controls another person. A person who knowingly enters into a joint venture with a person who
has been convicted of a public entity crime in Florida during the preceding 36 months shall be
considered an affiliate.
11.5.
I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural
person or entity organized under the laws of any state or of the United States with the legal power to
enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or
services let by a public entity, or which otherwise transacts or applies to transact business with a public
entity. The term "persons" includes those officers, directors, executives, partners, shareholders,
employees, members, and agents who are active in management of any entity.
Based on information and belief, the statement which I have marked below is true in relation to the entity
submitting this sworn statement. (Indicate which statement applies.)
11.6.
x
Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, nor any
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
c
The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of
Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the
State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer
determined that it was not in the public interest to place the entity submitting this sworn statement on the
convicted vendor list. (Attach a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE
PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND,
THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO
A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA
STATUTES, FOR CATEGORY TWO OF A:I7ANGE IN TH.E IN:1MATION CONTAINED IN THIS FORM.
By ~ F[Y/uIk-.IF II!
(Signature) , I
Thomas F. Mullin, PE
(Printed Name)
\~i~p Prps;n~nt. ~9na~er of Engineering/Geotechnical
(Title) Design Services
I +~ day of ~ ' 20-LL-, by
/~~
Si\l)lature: Not~rycfublic - State of Florida
.Q.H (teL..~'L J11r~
Print or Type Commissioned Name
OR produced Identification ,.II fit
\\,UI.'",
F!.it1l-ARY STJmflbftYl~~~
i. .\ Notary Public - State ot Florida
\"}l rI1 My Comm. Expires Mar 22. 2015
"'-:'>ic.,,'if;.".1-" Commission /I EE 49014
I",.".,'
Personally Known
/
!'I/It
c
Type of Identification Produced
3 of 7
10/1998
c
c
c
EQUAL OPPORTUNITY /
AFFIRMATIVE ACTION
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
EQUAL OPPORTUNITY I AFFIRMATIVE ACTION STATEMENT
The contractors and all subcontractors hereby agree to a commitment to the principles and
practices of equal opportunity in employment and to comply with the letter and spirit of
federal, state, and local laws and regulations prohibiting discrimination based on race,
color, religion, national region, sex, age, handicap, marital status, and political affiliation or
belief.
Signed:
fL mL Pf, f,;)
/
Title: Vice president, Manaqer of Enqineerinq/Geotechnical Design Services
Firm: URS Corporation Southern
Address: 3343 West Commercial Boulevard, suite 100
Fort Lauderdale, FL
33309
4 of 7
DECEMBER 28, 2010
c
0t~NY 1~'(
o~\..\:......tJ''''~
t/~..... "~,
~!.'. .... ........ ..' ~)
. \ " '0/.. . . /
~ -'_ ,',d ....-...--,' .
" ''.;, .V,_ . .~. .... ..,.
,J- .9,1; :-__._ ._'__: .,...,,' ..
"r ,< ;,: ~~,~~"o"
CONFLICT OF INTEREST
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach. FL 33160
Telephone: (305) 947-0606 Fax (305) 949-3113
CONFLICT OF INTEREST STATEMENT
The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. proposers must
disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the
City of Sunny Isles Beach or its agencies,
STATE OF FLORIDA
COUNTY OF Palm Beach
BEFORE ME, the undersigned authority, personally appeared Thomas F. Mullin
deposes, and states:
18.1. I am the V.P., Manager of Engineering/Geotechnical Design Seqni.ces of
URS Corporation Southern ~1. a local office in Fort Lauderdale and principal office in
San Francisco
, who was duly sworn,
18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No, 11-07-01 described
as: Speci.o 1 Tn c:pP("t-; (''In ~""'s The Affiant has made diligent inquiry and provides the information contained in this
Affidavit based upon hiS own knowledge.
18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has
no financial interest in other entities submitting Bids for the same project.
18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in
any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for
the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and
execution of the Contract for this project.
c
18.5 Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or otherwise ineligible from
participation in contract letting by any local, State, or Federal Agency,
18.6 Neither the entity, nor its affiliates, nor anyone associated with them have any potential conflict of interest due to any
other clients, contracts, or property interests for this project.
18.7 I certify that no member of the entity's ownership or management is presently applying for any employee position or
actively seeking an elected position with the City of Sunny Isles Beach,
18.8 I certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City
of Sunny Isles Beach,
18.91n the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will
immediately notify the City of Sunny Isles Beach.
D'(J't;,,:-W;;;:1& t'.l!;.ljf 7}..~ !-:I'lI"I/:",
AFFIANT I Print or Type Name and Title
19.. j()
S'lJdrn to and subscribed before me this L- day of ~ '-1
Iii' Personally Known OR' /
o Produced Identification 1111 P ; Type of Id/e;?;e::"~~ "'
NOTARY PU ~
~..t~~lt~:", ~HIRLEY STARK
1m ~ Notary Public - State 01 Florida
\. ~~ My Comm. Expires Mar 22. 2015
"'~'~f~~.$ Commission II EE 49014
"it,...,,'
~ll.
,~,
,-26+9. 2-0 I {
c
5 of 7
DECEMBER 28. 2010
c;
c
c
DISPUTE DISCLOSURE
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach. FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
DISPUTE DISCLOSURE FORM
Answer the following questions by placing a "X" after "Yes" or "No". If you answer "Yes", please
explain in the space provided, or on a separate sheet attached to this form.
19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the
Department of Professional Regulations or any other regulatory agency or professional associations within the last
five (5) years?
YES
NO
x
19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a
contract or job related to the services your firm provides in the regular course of business within the last five (5)
years?
YES
NO
x
19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims,' Bid protests,
or litigation in the past five (5) years that is related to the services your firm provides in the regular course of
business?
YES x NO If yes, state the nature of the request for equitable adjustment, contract
claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the
monetary amounts of extended contract time involved.
I hereby certify that all statements made are true and agree and understand that any misstatement or
misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid
for the City of Sunny Isles Beach.
~aF;;L
:ut orized Signature
7 /II( / ( (
Date
Thomas F Mullin, Vice President, Manager of
Print or Type Name and Title Engineering/Geotechnical
Design Services
6017
DECEMBER 28. 2010
City of Sunny Isles Beach: Special Inspection Services
RFQ No. 11-07-11
C DISPUTE DISCLOSURE ATTACHMENT
c
c
19.3 Has your firm had against it of filed any requests for equitable adjustment, contract claims, bid
protests, or litigation within the last five years that is related to the services your firm provides in
the regular course of business?
As with any national professional service organization the size of URS Corporation, from time to time, it is
involved in litigation. URS has substantial liability insurance to protect itself from litigation. Additionally, the
Company has substantial assets, including liquid assets of several million dollars. Companies that are our
size will have various legal proceedings pending against the Company or its subsidiaries in connection with
the performance of professional services. The Company's management does not believe that any of such
proceedings will have a material adverse effect on the consolidated financial position and operations of the
Company.
Presented below are current arbitrations occurring in the State of Florida:
Case Name Case No. Proiect Description Status
Walter Gaitan Florida State URS Corporation Southern Plaintiff alleges a wrongful Discovery is ongoing.
et al. v. URS Circuit Court, allegedly provided design death claim against URS
Corporation Miami-Dade services to FDOT for the Corporation Southern, alleging
Southern. et County, case no. installation of a cable that URS provided consulting
& 09-CA-29561 barrier system along a services in relation to a cable
portion of the Homestead barrier system that allegedly
Extension of Florida's failed and allegedly caused the
Turnpike death of the decedents.
7-1 I P age
URS
c
c
c
ANTI-KICKBACK
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach. FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
9r \u""
ANTI-KICKBACK AFFIDAVIT
STATE OF FLORIDA )
)
COUNTY OF PALM BEACH )
I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid
will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a
commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or
by an officer of the corporation.
By:
~FjijLi r~#
Title: V. P., Manager of Engineering/Geotechnical
Design Services
The foregoing instrument w3 acknowledged before me this /4<!- day of
~ 20~, by ----1.J1 oVl'l.a.5 F M.v..11 i () [name
of perso], as V,'c.e:.- fr-es i e<.-e4 [type of authority], for
Ute~ (ocFOrl1o..t1rY\ S9-~ef'f\ [name of party on behalf of whom instrument was
executed].
AFFIX NOTARY STAMP HERE:
- --
~ "~~~';::;'" ~HIRLEY STARK
./"O[lt-' .
~ !<FJ \ Notary Public . State of Florida
,i' .'~MyComm.ExpiresMar22.2015
· ...c.I'... ~~
"":;'ioff'~~" Commission 1# EE 49014
"".....,..
~ -
Personally Known ~ OR Produced ~entification Nt
Type of Identification Produced .I'I!f3
DECEMBER 28. 2010
7 of 7
o
ENR's #1 Design Firm for Eight
Consecutive Years (2001-2008)
Geotechnical Services
URS provides geotechnical services for large and
small projects that range from ordinary to
extraordinary. Our technical expertise is applied
to meet exacting performance criteria as well as
the project's budget and schedule. As a full-
service organization with a global network of
offices, we provide continuity during every stage of
project development virtually anywhere in the
world.
Since being established in 1938, URS has
become a trusted resource for facility design,
environmental management and construction-phase
services.
Overview
o
URS has pioneered innovative foundation
designs for high rise structures in Florida.
Q
Global Expertise, Superior Local Solutions
High-quality geotechnical design, engineering and
construction services are essential to the success
of a project. URS' geotechnical specialists have
helped clients achieve their goals on over 10,000
projects in more than 162 countries.
Our geotechnical professionals are problem
solvers. Developing creative, practical
geotechnical solutions is their specialty. Our
staff's focused investigative approach and
analytical expertise yield reliable results in a cost-
effective manner.
Variable riverbed conditions required
extensive geotechnical studies to
properly assess foundation designs.
Value-Added Benefits
. We scope our investigations to meet the
exact needs of our client no more, no less.
. Our years of experience allow us to make
optimum use of the information gathered to
characterize a site.
. We have no vested interest in using
particular equipment, and select the most
cost-effective, technically suitable equipment
for each assignment.
. At URS, unlike many firms, geotechnical
investigations are planned and overseer:-)
professional engineers, not technicians. ....
Geotechnical investigations performed by URS provide a solid basis
for site/route planning, facility layout and foundation design and
construction. Costs are controlled by anticipating geologic hazards
and problem soil conditions prior to facility design and construction.
Our staff provides a thorough assessment of geologic and
subsurface conditions. We apply the most suitable and cost-
effective geotechnical investigative techniques and supervise all
aspects of field drilling, sampling and testing. Laboratory testing is
performed under stringent quality control/quality assurance
standards.
Services:
. Visual Reconnaissance and Aerial
Photo Interpretation
. Site/Route Selection Studies
. Feasibility Studies
. Detailed Site Investigations
. Coastal and Offshore
Investigations
. Geophysical Testing
. In Situ Testing
. Laboratory Testing of Soil and
Rock Samples
JI'
'\
o
Studies of marine soils
beneath an offshore gas
platform in the Gulf of
Mexico led to foundation
strengthening
modifications that
increased structural
safety.
o
c
o
Soils and Foundation En ineerin
URS specializes in providing innovative soils and foundation engineering solutions that are
designed to create value for our clients. Our experience encompasses all types of commercial
and industrial facilities as well as infrastructure projects. Our expertise is applied to new
projects as well as existing facilities in need of re-engineering. We develop ground
improvement and stabilization designs. We also provide practical solutions for strengthening
existing foundations. With our experience, knowledge of local conditions and worldwide
network of offices, we provide a high degree of expertise in a prompt and cost-effective
manner.
Services:
. Deep and shallow foundation engineering
. Ground improvement and stabilization
. Slope stabilization and design
. Retaining wall and containment structure
design
. Geotechnical engineering for tunnels and
underground structures
. Seismic design for foundations and earth
structures
. Soil liquefaction analysis
. Dredging, coastal and offshore engineering
Value Added Benefits
. To help clients decide upon
the best solution for a site,
we provide comparative
cost/benefit analyses of the
feasible alternatives.
. Whether a project site is
readily accessible or in a
remote location, URS has
the expertise to get the job
done. Our staff has
extensive experience with
the use of appropriate
technology and technology
tr~ ncfor
URS' innovative-drilled shaft foundation
system for the 55-story Southeast
Financial Center in Miami was the first
of its kind to be developed in the
geologically problematic setting of
south Florida.
Numerical Modeling
-- "." .-
I
.',.. - ~
. -.
_ _~ ~ _ ~ -4 . _
-~. ". .. ~. - -..~ 1
"_ ~< ~ J ~~ ~'" ~ *~_ t" ~ i~
Numerical models developed
by URS were used to analyze
and correct problems that
occurred during construction
of a new subway system in
Los Angeles.
URS' advanced numerical modeling capabilities
are key to the success of numerous geotechnical
engineering projects. Our staff can utilize
sophisticated numerical modeling techniques to
predict the behavior of soils and structures under a
variety of conditions, such as earthquakes and
other natural phenomena. The data obtained from
numerical modeling are used to develop
appropriate design criteria. This saves our clients
money by avoiding the unnecessary costs
associated with over-designed structures. URS
has received numerous awards for technical
excellence for the innovative solutions developed
by our staff through numerical modeling.
o
Value Added Benefits
. Numerical Modeling enables more Services:
precise analysis of complex . Two and three-dimensional
conditions than conventional modeling
methods, and helps optimize design . Failure analyses
and performance. . Soil-structu re interaction
. Our numerical modeling programs analyses
which are compatible with a wide . Soil and rock creep studies
range of clients computer programs . Earthquake loading ()
and enable us to transfer data assessments
quickly and cost effectively. . Soil liquefaction analyses
. Preventive studies can be . Nonlinear soil and rock behavior
performed to rapidly evaluate the studies
sensitivity of a design to extreme . Foundation design and
soil or loading conditions. settlement analyses
Design Services
URS' focus on developing reliable, cost-effective geotechnical design criteria for projects
from simple, shallow foundations to major earth structures helps facilitate project
development. Our geotechnical engineers provide comprehensive support from conceptual
design through final design. They develop reliable cost estimates and practical project
schedules. Our staff uses constructability reviews and value engineering techniques to
maximize design results and cut unnecessary costs.
Services:
· Feasibility studies
. Conceptual design
. Preliminary design
. Final design drawings and
specifications
. Cost estimating and scheduling
. Design reviews and value
enQineerinQ
J
o
URS Geotechnical and Civil Design Services have
been key components to construction of over 200
acres of container yard and wharf's at Port
Everglades South Port area.
c
Value Added Benefits
· URS provides clients with complete
geotechnical design services as well as
design-build services for a wide range of
civil, remediation and infrastructure projects.
· Our computer-aided design and drafting
systems, including Integraph Microstation
and AutoCAD, are compatible with most
clients' systems.
· Our state-of-the-art visual simulation
capabilities enable us to provide photo-like
images of conceptual designs for meetings
and Qovernment presentations.
Amerada Hess saved 50 percent of
the estimated foundation construction
costs for a refinery expansion on St.
Croix as a result of the piling
installation design criteria developed
by URS.
Construction-Phase Services
URS has decades of experience with the construction phase of projects. Our staff provides
a full range of construction support services, including construction inspection, supervision
and management. The company also offers design-build and general construction services
for infrastructure, civil and remediation projects. Our geotechnical staff frequently serves as
liaison between owners, contractors, project engineers, and permitting agencies. They
verify compliance with design specifications and resolve unexpected problems to keep
projects on track.
c
Services:
· Construction inspection, supervision
and management
· Design-build services
· General contracting
· Quality control
· Cost control
· Forensic Engineering
· Claims Consulting
Value-Added Benefits
. Our staff uses the latest project
management and cost control
techniques to keep construction
projects running on schedule and
within budget.
. Combined geotechnical and
construction experience allows us to
identify technical concerns at an early
stage and resolve them before they
become problems.
. Relying on URS for design and
construction support enables our
clients to maintain project continuity.
y~
URS extensive drilled shaft experience
facilitated deep large diameter drilled shaft
construction for the MacArthur Causeway
Bridge in Miami.
Field Testin and Instrumentation
Our state-of-the-art field-testing and instrumentation services help keep projects on
track, enhance safety during construction and result in overall savings on a project. 0
URS' geotechnical experts monitor the behavior of soils and foundation before, during
and after construction. They confirm that design/construction specifications have been
met. URS has extensive experience with both manned and remotely operated
instrumentation systems. Services include system planning and cost estimation,
preparation of plans and specifications, installation, calibration/testing, operation and
troubleshooting.
..... \1
~
URS performed foundation monitoring during implosion
of high-rise under construction after a fire destroyed the
structure. URS provided construction engineering
inspection services for the original and rebuilding
phases.
Value Added Benefits
. URS has patented a wide
range of geotechnical
testing equipment and has
designed customized
systems for special needs.
. We design and implement
automated systems for
instrumentation data
processing that dramatically
reduce monitoring.
. Performance monitoring
and instrumented test
programs often permit
design optimization
a
o
c
o
Services
. Performance testing
. Static load testing
. Dynamic load and integrity
testing
. Wave equation analysis
. Strain gauge testing
. Seismic response spectra
monitoring
. Pore pressure monitoring
. Remote monitoring
. Property/structures
condition surveys
. Sondex instrumentation
. Vibration monitoring
. Specialized geotechnical
monitoring
. Structural benchmark
monitoring
. Slope stability/inclinometer
monitoring
URS pioneered the first load testing and
use of high capacity 24"1] (450 tons) and
30"1] (660 tons) augercast piles on the
Millennium and Acqalina high rise towers
in South Florida.
Special Geotechnical and Related Consultin Services
Earthquake and Structural Engineering
Managing seismic risk is a major area of practice at URS. Our earthquake and structural
engineers provide design and retrofitting recommendations, including reinforced
foundations, to reduce risks to buildings, lifelines and manufacturing facilities as well as
electrical and mechanical equipment.
Environmental Management and Site Remediation
Our environmental experts are experienced in all aspects of environmental management
from the implementation of corporate-wide programs to site-specific projects. They develop
cost-effective, risk-based remediation strategies and assist clients in acquiring
environmental permits.
Public Involvement
For major projects, URS provides complete support for public participation programs. Our
public involvement specialists build consensus and encourage the development and public
acceptance of projects.
Forensic Engineering and Litigation Support
URS provides geotechnical forensic services for construction defects, and comprehensive
litigation support from the start of litigation planning through trial preparation and courtroom
proceedings. Our diverse staff provides expert witness testimony for a wide range of
disciplines.
The Campan
URS is part of the URS Group, a global network of companies providing full-service engineering, 0
environmental, construction management and litigation support. With over 300 offices in 30
countries, the group companies work individually or as teams on projects requiring broader skills.
Like other URS Group companies, URS provides comprehensive capabilities through a variety of
delivery modes, including alliances, extension of staff, turnkey and equity participation activities.
Service Areas
URS' integrated services approach provides clients with the full range of capabilities required to plan,
design, construct and operate security and threat protection measures. URS specialists perform
assessments, design early detection and physical protection systems and manage the construction,
operation and maintenance of these systems. Whether the project involves new construction or
retrofit, URS' In-house specialists develop cost-effective solutions to meet our client's needs.
Engineering
Agricultural
Chemical
Civil
Coastal
Earthquake
Electrical
Environmental
Forensic
Geotechnical
Instrumentation
Marine
Mechanical
Mining
Nuclear
Process
Structural
Environmental and Earth Sciences
Air Quality
Ecology
Water Resources
Geosciences
Permitting and Licensing
Regulatory Compliance
Waste Management
Remediation
Decommissioning
o
Construction
Construction Management
Design-Build
General Contracting
Bidding
Scheduling
Cost Control
Value Engineering
Specialized Consulting
Architecture
Economics
Health and Safety
Information Management
Litigation Support
Planning
Public Involvement
Risk Management
Presentation Graphics
URS Corporation
7800 Congress Avenue, Suite 200
Boca Raton, FL 33487
PH: 561.994.6500
FAX: 561.994.6524
E-Mail: juli_edwards@urscorp.com
www.urscorp.com
URS Corporation
7650 West Courtney Campbell Causeway
Tampa, FL 33607
PH: 813.286.1711
FAX: 813.287.8591
E-Mail: annette_ball@urscorp.com
www.urscorp.com
For additional information contact:
For additional information contact:
C)
Thomas Mullin, PE or Juli Edwards
at
561.994.6500
Charles Evans, ~; or Annette Ball URS
813.286.1711