HomeMy WebLinkAboutReso 2011-1782
RESOLUTION NO. 2011 - --.1.J..B2.
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
SUNNY ISLES BEACH, FLORIDA, AWARDING RFQ NO. 11-07-01
TO AND ENTERING INTO AN AGREEMENT WITH CALVIN
GIORDANO AND ASSOCIATES, INC. FOR SPECIAL INSPECTION,
GEOTECHNICAL/CONTRACT ADMINISTRA TION SERVICES
FOR NEWPORT PIER AND RESTAURANT PROJECT, IN AN
AMOUNT NOT TO EXCEED FOUR HUNDRED THIRTY-FOUR
THOUSAND FIVE HUNDRED THIRTY -TWO DOLLARS AND
FIFTY CENTS, ($434,532.50), A TT ACHED HERETO AS EXHIBIT
"A"; AUTHORIZING THE MAYOR TO EXECUTE SAID
AGREEMENT; AUTHORIZING THE CITY MANAGER TO DO ALL
THINGS NECESSARY TO EFFECTUATE THIS RESOLUION;
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, on July 1, 2011, the City advertised and issued Request for Qualifications
(RFQ) No. 11-07-01 for Special Inspections services including geotechnical services, construction
administration, and other services as specified with the RFQ for the Newport Pier and Restaurant
Project, for which four responses were received; and
WHEREAS, staff has recommended Calvin Giordano and Associates, Inc. based on relevant
experience, qualifications, past performances related to the specific RFQ requirements, as well as the
firm's knowledge of City projects; and
WHEREAS, the implementation of these new and/or additional goods and services requires
certain budget amendments to the Fiscal Year 2010/2011 Budget; and
WHEREAS, Calvin Giordano and Associates, Inc. has expressed its ability and desire to
provide these services; and
WHEREAS, the City wishes to enter into an agreement with Calvin Giordano and
Associates, Inc. for Special Inspection, Geotechnical, and Construction Administration Services as it
relates to the Newport Pier and Restaurant Project, in an amount not to exceed Four Hundred Thirty-
Four Thousand Five Hundred Thirty-Two Dollars and Fifty Cents ($434,532.50), attached hereto as
Exhibit "A".
NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS:
Section 1. Incorporation of Recitals. The recitals set forth in this Resolution are incorporated
herein by reference as if fully set forth herein.
R2011- Calvin Giordano Agmt Pier (Bid 11-07-01)
Page 1 of2
Section 2. Award of Bid and Approval of Agreement. The City Commission hereby awards Bid
No. 11-02-02 to and enters into an Agreement with Calvin Giordano and Associates, Inc. for Special
Inspection, Geotechnical, and Construction Administration Services as it relates to the Newport Pier
and Restaurant Project, in an amount not to exceed Four Hundred Thirty-Four Thousand Five
Hundred Thirty-Two Dollars and Fifty Cents ($434,532.50), attached hereto as Exhibit "A".
Section 3.
Authorization of Mavor. The Mayor is hereby authorized to execute said Agreement.
Section 4. Authorization of City Manager. The City Manager is hereby authorized to do all
things necessary to effectuate this Resolution.
Section 5.
Effective Date. This Resolution will become effective upon adoption.
PASSED AND ADOPTED this 20th day of September 2011.
/j J J
W~ :4
~
ATTEST:
.
C t\ Ll~~~
~,CMC, City Clerk
D AS TO FORM
A SUFFICIENCY:
Moved by:
Cn~~ Sc:.\-{OLL
V, G ~ -r ~h~-L~
Seconded by:
Vote: 5-0
Mayor Edelcup
Vice Mayor Thaler
Commissioner Aelion
Commissioner Gatto
Commissioner Scholl
~(Y es)
V(Y es)
V(Y es)
~Y es)
_(Yes)
_(No)
_(No)
_(No)
_(No)
_(No)
R2011- Calvin Giordano Agmt Pier (Bid 11-07-01)
Page 2 of2
3A
AGREEMENT BETWEEN THE CITY (
ISLES BEACH AND CALVIN, GIORDANO & A
FOR PROJECT MANAGEMENT FOR THE NEW}
CONTRACT NO. CIOII-066
Q-20- rl
THIS AGREEl\1ENT, entered into this '2-Dt!!. day of S€t="t""tM~e2011, by and
between the CITY OF SUNNY ISLES BEACH (hereinafter referred as to the "City") and
CALVIN, GIORDANO & ASSOCIATES, INC. a Florida corporation, authorized to do business
in the State of Florida (hereinafter referred to as the "Consultant"), whose federal tax
identification number is
RECIT ALS
WHEREAS, the City is in need of project management services for the demolition and
re-construction of the Newport Fishing Pier project located at 16701 Collins Avenue
("Services"), consisting of prime consulting, project management, and construction inspection,
as more particularly described in Attachment "A", attached hereto and made a part hereof; and
WHEREAS, the City issued Request for Qualifications No. 11-07-01 for Special
Inspection Services, including Geotechnical/Construction Administration for the Services
described herein; and
WHEREAS, the Consultant is qualified, willing and able to provide the Services on the
terms and conditions set forth herein; and
WHEREAS, the City desires to enter into this Agreement with Consultant to provide the
Services in a total amount not to exceed $434,532.50 (Four Hundred Thirty Four Thousand Five
Hundred Thirty Two Dollars and Fifty Cents).
NOW THEREFORE, in consideration of the foregoing and for the mutual covenants,
representations and warranties and other good and valuable consideration, the receipt and
adequacy of which is hereby acknowledged, the parties agree as follows:
1. RECIT ALS. The Recitals set forth above are hereby incorporated into this Agreement
and made a part hereof for reference.
2. CONTRACT DOCUl\1ENTS. This Agreement incorporates the Contract Documents as
that term is defined in Request for Qualifications No. 11-07-01.
3. SERVICES. Consultant shall provide to the City the Services as more particularly
described in Attachment "A" attached hereto and made a part hereof.
4. ADDITIONAL SERVICES. If the need for additional work or changes under this
Agreement is identified by Consultant during the course of performing its obligations hereunder,
Consultant shall set forth such additional work and the cost thereof in a supplemental work order
(a "Supplemental Work Order") and submit such Supplemental Work Order for approval by the
Page I of II
<:
t..)
- "
C I 0 11-066 Calvin, Giordano & Associates, Inc. Project Management Agreement for the Pier
City Manager or his designee. No such additional work shall be done or paid for without the
specific prior written approval of the City Manager or his designee.
5. TERM. The term of this Agreement shall begin upon the execution of this Agreement
by both parties and shall end upon completion of the Services.
6. COMPENSATION. As the entire compensation under this Agreement and during the
terms of this Agreement, in whatever capacity rendered, the City shall pay Contractor an amount
not to exceed $434,532.50 (Four Hundred Thirty Four Thousand Five Hundred Thirty Two
Dollars and Fifty Cents) for the performance of the stated Services. Payment to Consultant for all
charges and tasks under this Agreement shall be in accordance with this Agreement and the
schedule of charges reflected in Attachment "A" and under the following conditions:
a. Disbursements. There are no reimbursable expenses associated with this contract.
b. Payment Schedule. Invoices received from the Consultant pursuant to this
Agreement will be reviewed by the initiating City Department. If services have
been rendered in conformity with the Agreement, the invoice will be sent to the
Finance Department for payment. Invoices must reference the contract number
assigned hereto. Invoices will be paid in accordance with the State of Florida
Prompt Payment Act.
c. A vailability of Funds. The City's performance and obligation to pay under this
Agreement is contingent upon an annual appropriation for its purpose by the City
Commission.
d. Final Invoice. In order for both parties herein to close their books and records,
the Consultant will clearly state "final invoice" on the Consultant's final/last
billing to the City. This certifies that all services have been properly performed
and all charges and costs have been invoiced to the City. Since this account will
thereupon be closed, any other additional charges, if not properly included on this
final invoice, are waived by the Consultant.
Consultant shall make no other charges to the City for supplies, labor, taxes, licenses, permits,
overhead or any other expenses or costs unless any such expense or cost is incurred by
Consultant with the prior written approval of the City. If the City disputes any charges on the
invoices, it may make payment of the uncontested amounts and withhold payment on the
contested amounts until they are resolved by agreement with Consultant. Consultant shall not
pledge the City's credit or make it a guarantor of payment or surety for any contract, debt,
obligation, judgment, lien, or any form of indebtedness. The Consultant further warrants and
represents that it has no obligation or indebtedness that would impair its ability to fulfill the
terms of this Agreement.
7. INDEPENDENT CONTRACTOR RELATIONSIDP. The Consultant IS an
independent contractor and shall be treated as such for all purposes. Nothing contained in this
Agreement or any action of the parties shall be construed to constitute or to render the Consultant
an employee, partner, agent, shareholder, officer or in any other capacity other than as an
Page 2 of II
,
"'-.
v
CIOII-066 Calvin, Giordano & Associates, Inc. Project Management Agreement for the Pier
independent contractor other than those obligations which have been or shall have been
undertaken by the City. Consultant shall be responsible for any and all of its own expenses in
performing its duties as contemplated under this Agreement. The City shall not be responsible
for any expense incurred by the Consultant. The City shall have no duty to withhold any Federal
income taxes or pay Social Security services and that such obligations shall be that of the
Consultant, other than those set forth in this Agreement. Consultant shall furnish its own
transportation, office and other supplies as it determines necessary in carrying out its duties
under this Agreement.
8. OWNERSHIP OF DOCUl\1ENTS AND EOUIPl\1ENT. All documents prepared by
the Consultant pursuant to this Agreement and related Services to this Agreement are intended
and represented for the ownership of the City only. Any other use by Consultant or other parties
shall be approved in writing by the City. If requested, Consultant shall deliver the documents to
the City within fifteen (15) calendar days.
9. INSURANCE. Consultant shall, at its sole cost and expense, during the period of any
work being performed under this Agreement, procure and maintain the minimum insurance
coverage specified in to protect the City and Consultant against all loss, claims, damage and
liabilities caused by Consultant, its agents, sub-Consultants or employees, as indicated below:
Comprehensive General Liability with minimum limits of Two Million Dollars
($2,000,000.00) per occurrence combined single limit for Bodily Injury Liability and
Property Damage Liability. Coverage must be afforded on a form no more restrictive
than the latest edition of the Comprehensive General Liability policy, without restrictive
endorsements, as filed by the Insurance Services Office, and must include:
o Premises and Operation
o Independent contractors
o Products and/or Completed Operations Hazard
o Broad Form Property Damage
o Broad Form Contractual Coverage applicable to this specific Agreement,
including any hold harmless and/or indemnification agreement.
o Personal Injury Coverage with Employee and Contractual Exclusions removed,
with minimum limits of coverage equal to those required for Bodily Injury
Liability and Property Damage Liability
o Jones Act Maritime Insurance Coverage
Business Automobile Liability with minimum limits of One Million Dollars
($1,000,000.00) per occurrence combined single limit for Bodily Injury Liability
and Property Damage Liability. Coverage must be afforded on a form no more
restrictive than the latest edition of the Business Automobile Liability policy,
without restrictive endorsements, as filed by the Insurance Services Office, and
must include:
o Owned Vehicles;
o Hired and Non-Owned Vehicles;
o Employers' Non-Ownership.
Page 3 of II
",
'0
C 1011-066 Calvin, Giordano & Associates, Inc. Project Management Agreement for the Pier
Before starting the Services, the Consultant shall file and make sure that all
certificates of insurance required by this document and by the Agreement are in
the City's possession. These certificates shall contain a provision that the
coverage afforded under the policies will not be canceled or materially changed
until at least thirty (30) days prior written notice has been given to the City
Manager or his designee by certified mail. The City shall be named as an
additional insured on the above-referenced policies.
The Consultant agrees that if any part of the Services under the Contract is sublet,
they will require the Sub-Consultant(s) to carry insurance as required, and that
they will require the Sub-Consultant(s) to furnish to them insurance certificates
similar to those required by the City in this section.
Cancellation and Re- Insurance:
If any insurance should be canceled or changed by the insurance company or
should any insurance expire during the period of this Agreement, the Consultant
shall be responsible for securing other acceptable insurance to provide the
coverage specified in this section to maintain coverage during the life of this
Agreement. All deductibles must be declared by the Consultant and must be
approved by the City. At the option of the City, either the Consultant shall
eliminate or reduce such deductible or the Consultant shall procure a Bond, in a
form satisfactory to the City, covering the same.
Insurance required of the Consultant shall be primary to, and not contribute with, any insurance
or self-insurance maintained by the City. Such insurance shall not diminish Consultant's
indemnification and obligations hereunder. The insurance policy(ies) shall be issued by
companies authorized to do business under the laws of the State of Florida and acceptable to the
City with a minimum A.M. Best rating of A-Excellent. Before any work under this
Agreement is performed, and at any time upon request, Consultant shall furnish to the
City certificates of insurance evidencing the minimum required coverage and shall be
appropriately endorsed for contractual liability, with the City named as additional insured.
All policies shall contain a waiver of subrogation endorsement. All policies and certificates shall
be in forms and issued by insurance companies acceptable to the City Manager or his designee.
All insurance policies and certificates of insurance shall provide that the policies may not be
canceled or altered without thirty (30) days prior written notice to the City. Consultant shall also
require and ensure that each of its Sub-Consultant(s) providing services hereunder (if any)
procures and maintains, until the completion of the services, insurance of the types and to the
limits specified herein. ANY EXCEPTIONS TO THE INSURANCE REQUIREl\1ENTS IN
THIS SECTION MUST BE APPROVED IN WRITING BY THE CITY.
10. PERMITS AND CITY CODE COMPLIANCE. Consultant shall secure all necessary
permits and licenses required in connection with the performance of the Services and shall
perform all such work in full compliance with the requirements of applicable codes, ordinances
and regulations of the City.
Page 4 of II
~\
CIOII-066 Calvin, Giordano & Associates, Inc. Project Management Agreement for the Pier
11. ACCIDENT PREVENTION. Consultant shall exercise proper precaution at all times
for the protection of persons and property and shall be responsible for damages to persons or
property, either on or off the Newport Fishing Pier site, which occur as a result of the
Consultant's execution of the Services. The safety provisions of applicable law and building and
construction codes shall be observed and the Consultant shall take or cause to be taken such
additional safety and health measures as the City may determine to be reasonable and necessary.
12. RESPONSIBILITY AND SUPERVISION OF WORK. Consultant shall be
responsible to the City for the acts and omissions of all the Consultant's employees, Sub-
Consultants, agents and all other persons performing any of the Services on behalf of the
Consultant. Consultant shall at all time enforce strict and good order among Consultant's
employees and shall not employ any unfit persons or anyone not skilled in the tasks necessary to
perform the Services. Consultant shall act as or employ a competent supervisor who shall
regularly visit the Newport Fishing Pier site and shall regularly communicate with the City
Manager or his designee during the progress of the Services.
13. INSPECTION. Consultant shall permit regular inspections by the City and other
appropriate officials in order to confirm that the Services are being conducted in accordance with
the terms and conditions of this Agreement and that the Services are satisfactorily completed.
14. INDEMNIFICATION. Consultant agrees to indemnify, defend and hold harmless, the
City, its officers, agents, and employees from, and against any and all claims, actions, liabilities,
losses and expenses including, but not limited to, attorney's fees for personal, economic or
bodily injury, wrongful death, sickness, disease, or loss of or damage to property, at law or in
equity, which may arise or may be alleged to have arisen from the acts, errors, omissions or other
wrongful conduct of the Consultant in connection with the performance of Services under this
Agreement, whether such acts, errors, omissions or other wrongful conduct be by the Consultant,
or any of the Consultant's subContractors, agents, employees, suppliers or any other personnel
entity acting under Consultant's control, and to that extent, the Consultant shall pay such claims
and losses and shall pay all such costs and judgments which may issue from any lawsuit arising
from such claims and losses and shall pay all costs and attorneys' fees expended by the City in
defense of such claims and losses including appeals. The parties agree that ten percent (10%) of
the total compensation is a specific consideration from the City to the Consultant for this
indemnity.
15. TERMINATION.
a. Termination for Default. If, through any cause within the reasonable control the
Consultant shall fail to fulfill in a timely manner or otherwise violate any of the
covenants, agreements or stipulations material to this Agreement, the City shall
have the right to terminate the Services then remaining to be performed. Prior to
the exercise of its option to terminate for cause, the City shall notify the Consultant
of its violation of the particular terms of the Agreement and grant Consultant ten
(10) days to cure such default. If the default remains uncured after ten (10) days
the City may terminate this agreement.
Page 5 of II
C:
v
C 1011-066 Calvin, Giordano & Associates, Inc. Project Management Agreement for the Pier
1. In the event of termination, all finished and unfinished documents,
data and other work product prepared by Consultant (and Sub-
Consultant[s]) shall be delivered to the City and the City shall
compensate the Consultant for all services satisfactorily performed
prior to the date of termination.
H. Notwithstanding the foregoing, the Consultant shall not be relieved of
liability to the City for damages sustained by it by virtue of a breach of
the Agreement by Consultant and the City may reasonably withhold
payments to Consultant for the purposes of set-off until such time as
the exact amount of damages due the City from the Consultant is
determined.
HI. After receipt of a Termination Notice and except as otherwise directed
by the City, the Consultant shall:
1. Stop work on the date and to the extent specified;
2. Terminate and settle all orders and subcontracts
relating to the performance of the terminated work;
3. Transfer all work in process, completed work and
other materials related to the terminated work to
the City; and
4. Continue and complete all parts of that work that
have not been terminated.
b. Termination for Convenience of City. The City may, for its convenience and
without cause, terminate the Services then remaining to be performed provided
that the Consultant is given ten (10) days written notice.
c. Termination for Insolvency. The City also reserves the right to terminate the
remaining Services to be performed in the event the Consultant is placed either in
voluntary or involuntary bankruptcy or makes any assignment for the benefit of
creditors.
16. ASSIGNl\1ENTS. TRANSFERS. SUBCONTRACTING. Other than the specific sub-
consultant services specifically identified in Attachment "A", attached hereto and incorporated
herein by reference, the Consultant shall not subcontract, assign or transfer any other services
under this Agreement without the prior written consent of the City Manager or his designee.
Should the Consultant subcontract any such services under this Agreement, it shall be done with
continued liability for the Consultant. The Consultant shall remain responsible for services,
responsibilities and liabilities of any person or entity acting under Consultant.
17. AUTHORITY TO PRACTICE. Consultant hereby represents and warrants that it has
and will continue to maintain all licenses and approvals required to conduct its business and that
Page 6 of II
':>
~
C 1011-066 Calvin, Giordano & Associates, Inc. Project Management Agreement for the Pier
it will at all times conduct its business activities in a reputable manner. Proof of such licenses
and approvals shall be submitted to the City prior to commencement of work under this
Agreement.
18. MODIFICATIONS OF SERVICES. The City reserves the right to make changes in
the Services, including alterations, reductions or additions thereto. Upon receipt of the City's
notification of a contemplated change, the Consultant shall (1) if requested by the City, provide
an estimate for the increase or decrease in cost due to the contemplated change, (2) notify the
City of any estimated change in completion date, and (3) advise the City in writing if the
contemplated change shall affect the Consultant's ability to meet the completion dates or
schedules of this Agreement.
19. COORDINATION OF SERVICES. The City's representative/liaison during the
performance of this Agreement shall be Gio Batista, Public Works Director/City Engineer
whose phone number is (305) 792-1909. Consultant shall not respond to requests for services
under this Agreement unless the request is received directly from Gio Batista. Any requests
received from other City departments/divisions shall be referred to Gio Batista first for approval
or if Gio Batista is unavailable, then to the City Manager, Alan J. Cohen for approval prior to
the commencement of any work. Services performed without authorization by Gio Batista,
Public Works Director/City Engineer or the City Manager, Alan J. Cohen, shall be considered
unauthorized and shall not be compensated/paid by the City.
20. l\1EDIATION AND ARBITRATION OF DISPUTES
The merits of any dispute arising under, out of, in connection with, or in relation to this
agreement, or the making or validity thereof, or its interpretation, or any breach thereof, shall be
determined and settled by Arbitration before an Arbitrator in the State of Florida, pursuant to
the Commercial Arbitration Rules then obtaining of the American Arbitration
Association. If the parties hereto are unable to agree upon the selection of an arbitrator,
such arbitration shall be held before the American Arbitration Association. Any award
rendered shall be final and conclusive upon the parties hereto and a judgment thereon may be
entered in the highest court of the State of Florida having jurisdiction.
Before submitting a dispute to Arbitration, the parties shall first attempt to resolve the dispute
amicably. In the event that the parties hereto are unable to resolve the dispute amicably, either
party may give notice for a Mediation session before a Mediator appointed by mutual
agreement (hereinafter the "Mediator"). If the parties are unable to agree upon the selection
of a mediator, such mediation shall be held before the American Arbitration Association. The
Mediator shall make a recommendation to the parties in the form of a written mediated
settlement agreement. Each party to the dispute shall sign such agreement after receipt of
the same or immediately file a demand for Arbitration, in which event the parties shall proceed
to Arbitration in accordance with the previous paragraph.
All costs of the Arbitration, including Mediation and the legal action to confirm and
enforce the arbitrator's award, as the case may be, including the reasonable legal fees of both
parties shall be paid by the non-prevailing party, or, if neither party prevails on the whole, each
party shall be responsible for a portion of the costs of Arbitration and Mediation as may be
determined by the court on confirmation.
Page 7 of II
F\ ,
~~
C1011-066 Calvin, Giordano & Associates, Inc. Project Management Agreement for the Pier
21. CONFIDENTIAL INFORMATION. The Consultant shall not, either during the term
of this Agreement or any time for a period of Ten (10) years subsequent to that date upon which
the Consultant shall leave the employment of the City for any reason whatsoever, disclose to any
person or entity, other than in the discharge of the duties of the Consultant under this Agreement,
any information which the City designates in writing as "confidential." As a violation by the
Consultant of the provisions of this Section could cause irreparable injury to the City and there is
no adequate remedy at law for such violation, the City shall have the right, in addition to any
other remedies available to it at law or in equity, to enjoin the Consultant in a court of equity for
violating such provisions.
22. NOTICES. All notices and other communications required or permitted to be given
under this Agreement by either party to the other shall be in writing and shall be sent (except as
otherwise provided herein) (i) by certified or registered mail, first class postage prepaid, return
receipt requested, (ii) by guaranteed overnight delivery by a nationally recognized courier
service, or (iii) by facsimile with confirmation receipt (with a copy simultaneously sent by
certified or registered mail, first class postage prepaid, return receipt requested or by overnight
delivery by traditionally recognized courier service), addressed to such party as follows:
If to the City: Alan J. Cohen With a copy to:
City Manager Hans Ottinot
City of Sunny Isles Beach City Attorney
18070 Collins A venue City of Sunny Isles Beach
Fourth Floor 18070 Collins A venue
Sunny Isles Beach, Florida 33160 Fourth Floor
Tel: (305) 792-1701 Sunny Isles Beach, Florida
33160
Tel: (305) 792-1702
If to the Consultant: Dennis J. Giordano, President
Calvin, Giordano & Associates, Inc.
1800 Eller Drive, Suite 600
Fort Lauderdale, Florida 33316
Tel: (954) 921-7781
23. GOVERNING LAW. The validity of this Agreement and the interpretation and
performance of all of its terms shall be construed and enforced in accordance with the laws of the
State of Florida, without regard to principles of conflict of laws thereof. The location of any
action or proceeding commenced under or pursuant to this Agreement shall be in Miami-Dade
County, in the State of Florida.
24. AUDIT. The Consultant shall make available to the City or its representative all required
financial records associated with the Agreement for a period of three (3) years.
25. NON-DISCRIMINATION. The Consultant agrees to comply with all local and state
civil rights ordinances and with Title VI of the Civil Rights Act of 1984 as amended, Title VIII
of the Civil Rights Act of 1968 as amended, Title I of the Housing and Community Development
Act of 1974 as amended, Section 504 of the Rehabilitation Act of 1973, the Americans with
Page 8 of II
'\.' \
~
CIOII-066 Calvin, Giordano & Associates, Inc. Project Management Agreement for the Pier
Disabilities Act of 1990, the Age Discrimination Act of 1975, Executive Order 11063, and with
Executive Order 11248 as amended by Executive Orders 11375 and 12086.
The Consultant will not discriminate against any employee or applicant for employment because
of race, color, creed, religion, ancestry, national origin, sex, disability or other handicap, age,
marital/family status, or status with regard to public assistance. The Consultant will take
affirmative action to insure that all employment practices are free from such discrimination.
Such employment practices include but are not limited to the following: hiring, upgrading,
demotion, transfer, recruitment or recruitment advertising, layoff, termination, rates of payor
other forms of compensation, and selection for training, including apprenticeship. The
Consultant agrees to post in conspicuous places, available to employees and applicants for
employment, notices to be provided by the City setting forth the provisions of this non-
discrimination clause. The Consultant agrees to comply with any Federal regulations issued
pursuant to compliance with Section 504 of the Rehabilitation Act of 1973 (29 U.S.c. 708),
which prohibits discrimination against the handicapped in any Federally assisted program.
26. CONFLICT OF INTEREST. The Consultant agrees to adhere to and be governed by
the Miami-Dade County Conflict of Interest Ordinance Section 2-11.1, as amended; and by
Sunny Isles Beach Ordinance No. 99-82, which are incorporated by reference herein as if fully
set forth herein, in connection with the Agreement conditions hereunder. Consultant covenants
that it presently has no interest and shall not acquire any interest, direct or indirectly that should
conflict in any manner or degree with the performance of the services.
27. WARRANTY. The Consultant warrants that the Services including equipment and
materials provided shall conform to professional standards of care and practice in effect at the
time the Services are performed, be of the highest quality, and be free from all faults, defects or
errors. The Consultant further warrants that all equipment and materials provided shall be new.
If the Consultant is notified in writing of a fault, deficiency or error in the Services provided
within one (1) year, unless a longer period is specified in the solicitation, from completion of the
Services, the Consultant shall, at the City's option, either re-perform such portions of the
Services to correct such fault, defect or error, at no additional cost to the City, or refund to the
City, the charge paid by the City, which is attributable to such portions of the faulty, defective or
erroneous Services, including the costs for re-performance of the work provided by other
Consultants.
28. FORCE MAJEUREIINTERRUPTION. Neither party shall be liable for any failure to
perform any of its obligations under this Agreement (except payment obligations) due to
unforeseen circumstances or causes beyond the party's reasonable control, including without
limitation, acts of God, riot, embargoes, acts of governmental authorities, fire, earthquake, flood,
accident, strikes, or inability to secure transmission facilities ("Force Majeure").
29. ENTIRE AGREEl\1ENT. This Agreement shall constitute the entire agreement
between the parties with respect to the subject matter hereof, and it shall supersede all previous
and contemporaneous oral and written negotiations, commitments, agreements and
understanding relating hereto. This Agreement may be executed in multiple identical
counterparts, each of which shall be deemed an original for all purposes.
Page 9 of II
{'..
~
CIOII-066 Calvin, Giordano & Associates, Inc. Project Management Agreement for the Pier
30. Al\1ENDl\1ENT. Any modification of this Agreement shall be effective only if in
writing and signed by the parties to this Agreement. No waiver of any provision of this
Agreement shall be valid or enforceable unless such waiver is in writing and signed by the party
granting such waiver.
31. CONFLICTING PROVISIONS. The terms and conditions of this Agreement shall
prevail over any contrary or inconsistent terms in any other document, including but not limited
to Attachment "A" which is attached hereto.
32. CONTINGENT ON APPROPRIATION OF FUNDS: The expenditure or advance of
any money or the performance of any obligation of the City under this Agreement shall be
contingent upon an appropriation for its specific purpose by the City Commission. In
recognizing that the City can only receive budget approval for one (1) fiscal year at a time, non-
appropriation shall be a legitimate reason to release the City from its performance/payments
obligations upon thirty (30) days' written notice to Consultant.
33. MISCELLANEOUS.
A. In the event any prOVIsIOn of this Agreement is found to be void and
unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement
shall nevertheless be binding upon the parties with the same effect as though the void or
unenforceable provisions had been severed and deleted.
B. This Agreement may be executed in multiple identical counterparts, each of
which shall be deemed an original for all purposes.
C. No waiver of any provision of this Agreement shall be valid or enforceable unless
such waiver is in writing and signed by the party granting such waiver.
[Remainder of this page intentionally left blank]
Page 10 of II
;....
~'
C I 0 11-066 Calvin, Giordano & Associates, Inc. Project Management Agreement for the Pier
IN WITNESS WHEREOF, the parties hereto have executed this Agreement III
duplicate on the day and year first written above.
~
Signature
CAL VIN, GIORDANO, AND
ASSOCIATES, INC.
G~rl~
Print Name
C, 10 rJq, V\IC:)
BY:
Signature and Title ?~ft/~
(~
"'
WITNE~
~- ~
ig ature
dO ~L T. /,;J ~ tvD ~
PnntName
ATTEST:
CITY OF SUNNY ISLES BEACH
B~)vLl~
Jane A. Hines, CMC, City Clerk
APPROVED AS TO FORM AND
LEGAL SUFFI ENCY
Page II of II
{" I
.~
CIOII-066 Calvin, Giordano & Associates, Inc. Project Management Agreement for the Pier
~4..' '-:-',1 Calvin, Giordano g Associates, Inc.
<:::::::t ~g
rs' !J E X C E P T ION A l SOL UTI 0 N 5
~
Building Code Services
Code Enforcement
Construction Engineering &
Inspection
Construction Services
Contract Government
Data Technologies &
Development
Emergency Management
Services
Engineering
Governmental Services
Indoor Air Quality
Landscape Architecture &
Environmental Services
Municipal Engineering
Planning
Public Administration
Redevelopment & Urban
Design
Surveying & Mapping
Transportation Planning &
Traffic Engineering
Utility & Community
Maintenance Services
1800 Eller Drive, Suite 600
Fort Lauderdale, FL 33316
Phone: 954.921.7781
Fax: 954.921.8807
www.calvin-giordano.com
August 30, 2011
Mr. Alan Cohen
City Manager
CITY OF SUNNY ISLES BEACH
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
Re: Work Authorization No. 137
Total Project Management of the Newport Fishing Pier
CGA Proposal No. 11-4239
Mr. Alan Cohen,
Enclosed for your review and approval is Work Authorization No. 137 for the
above referenced project. We have also included a location map showing the
vicinity of work to be performed as described within the scope of services.
Should you have any questions concerning this matter, please feel free to contact
me at your convenience.
CALVIN, GIORDANO & ASSOCIATES, INC.
Dennis J. Giordano
President
Fort Lauderdale
Homestead
Jacksonville
Atlanta
West Palm Beach
Port St. Lucie
Clearwater
August 30, 2011
Page 2 of 11
CITY OF SUNNY ISLES BEACH
PROJECT DESCRIPTION
Total Project Management of the Newport Fishing Pier
1. SCOPE OF SERVICES
Calvin, Giordano & Associates, Inc. shall perform the following services based on our
understanding of the project requirements:
I. PROFESSIONAL CONSTRUCTION SERVICES
A. PRIME CONSULTANT
PRIME CONSULT ANT's duties and responsibilities, including but not limited
to:
1. General Coordination: The PRIME CONSUL T ANT shall retain and
coordinate the professional sub consultants: SPECIAL INSPECTOR,
GEOTECHNICAL, SURVEY and MATERIALS TESTING
(SUB CONSUL T ANTS):
. Special Inspector: Shall be responsible for all structural inspections
required to provide structural Certification at the conclusion of the
Project. This shall include precast and cast in place concrete including
observations of precast plants operations and Building Department
Special Inspector Affidavits required for reinforced masonry, roof
trusses, windows & doors, steel connections and precast units as
applicable.
. Geotech: Shall undertake the responsibility of being the Engineer of
Record for the Project. The duties shall include: verification of design
criteria in the Pile Data Table, respond to RFI's, review Submittals
and certify the foundation package for the Project. Pile driving
monitoring and certification is included. Vibration monitoring during
pile driving as specified in the plans is included.
. Survey: Shall perform FDOT specified settlement monitoring and
independent field confirmation of Contractor's work.
. Materials Testing: Shall provide in-place density testing; concrete,
grout and masonry testing and coordinate field and laboratory efforts
and review all information and test results for purpose of quality
assurance and compliance with drawings and specifications.
. All work in compliance with Florida Building Code, the Building
Department and the Plans & Specifications as applicable.
2. He shall coordinate and communicate daily or periodically with the other
design sub consultants including: AlE, STRUCTURAL, MEP, CIVIL and
other disciplines as necessary. He shall report on progress and concerns as it
relates to the design, permitting and construction effort and activities. The
August 30,2011
Page 3 of 11
PRIME CONSULTANT shall coordinate local permitting with DERM and
W ASD and local service entities: FPL/TECO/CNMB/ AT&T and ABB. The
scope of work of this contract does not include the redesign services of the
drawings that may be required due to Owner initiated changes or any
redesign services due to permit requirements. However, the PRIME
CONSUL T ANT shall provide quality controls to ensure that any redesign by
the engineer of record is properly completed and coordinated with existing
approved drawings. In addition, the PC shall ensure that any redesign is
submitted to all Agencies Having Jurisdiction (AHJ) for approvals.
3. Pre-Design and permitting Meetings: The PRIME CONSULTANT shall be
expected to participate in Pre-Construction Meetings with the CITY,
SUBCONSUL T ANTS and PROJECT MANAGER.
4. Design and permitting Progress Meetings: The PRIME CONSULTANT
shall participate in project meetings with the CITY and PROJECT
MANAGER. These meetings shall serve as forums to review the status of
design and permitting progress, discuss construction issues, discuss schedule
and/or cost concerns, discuss potential changes or conflicts, review the status
of shop drawing submittals and contract document clarifications and
interpretations, and to resolve problems before they become critical. PRIME
CONSUL T ANT shall review meeting minutes provided by the PROJECT
MANAGER and provide comments or objections to written statements
within the specified timeframe.
5. Requests for Information/Contract Document Clarification (RFI's/CDC's):
When RFI's and CDC's involve design issue interpretations; the PRIME
CONSUL T ANT shall coordinate with the CITY as needed, and to resolve
the PROJECT MANAGER's Requests for Information, Contract Document
Clarifications, Field Orders, and other related correspondence.
B. PROJECT MANAGER
Project Manager's (PM's) duties and responsibilities, including but not limited
to:
1. General Coordination: The PM shall communicate daily or periodically
with the CITY, and the CONTRACTOR, as needed. He shall report on
concerns as it relates to the construction effort and activities. In addition, the
PM shall also coordinate with the CITY's Public Works Department where
notifications such as utility outages, road closures, etc. may be required. The
PM shall monitor and verify that the CONTRACTOR has made the required
notifications to the utility owners, residents and businesses as may be
required.
August 30, 20 II
Page 4 of 11
2. Pre-Construction Meetings: The PM shall be expected to chair and
participate in Pre-Construction Meetings with the CITY, CONTRACTOR
and SUBCONSUL T ANTS.
3. Weekly Construction Progress Meetings: The PM shall chair and
participate in weekly construction project meetings with the CITY,
CONTRACTOR and SUBCONSUL T ANTS. These meetings shall serve as
forums to review the status of construction progress, discuss construction
issues, discuss schedule and/or cost concerns, discuss potential changes' or
conflicts, review the status of shop drawing submittals and contract document
clarifications and interpretations, and to resolve problems before they become
critical. PM shall review weekly meeting minutes and two week look ahead
provided by the CONTRACTOR and provide comments or objections to
written statements within the specified timeframe. The PM shall prepare
reports that describe the construction activities, progress, incidents and issues
that have occurred on the construction site and distribute to the attendees in
advance of the construction progress meetings.
4. Field Observations: The PM shall conduct field observations on a periodic
basis throughout the duration of construction. To supplement those services
provided by the PM, CGA shall provide a Special Inspector Sub-Consultant
for inspection and certification of structural elements.
5. Specialty & AlE CONSULT ANT Site Visits: The PM shall monitor the
number of specialty site visits requested by the CONTRACTOR or CITY and
conducted by the AlE CONSULT ANT and/or Special Inspector. When it
becomes evident that a specialty site visit from the design Engineer of Record
(EaR) shall be required, the PM shall notify the EaR to discuss and schedule
a mutually acceptable time for meeting at the construction site. The PM shall
obtain any fees, proposals, or expenses required by the EaR for the City's
review and approval prior to any site visits that may be an added cost to the
City.
6. Photographic Record: Provide a photographic record of the overall progress
of construction, beginning with preconstruction documentation, following
with on-going construction documentation, and ending with post-construction
documentation. Photographs shall be digital snapshot type taken to define the
progress of the project.
7. Adherence to Contract Documents: The PM shall review materials and
workmanship of the project and report to the CITY any deviations from the
Contract Documents that may come to the PM's attention. PM shall provide
recommendations to the City of required actions, in accordance with the
Contract Documents, for the City's consideration.
8. Delivery of Unaccepted Materials to Jobsite: As new materials are
delivered to the jobsite, the PM shall check the material's certifications and
August 30,2011
Page 5 of 11
samples and verify that an approved shop drawing was submitted for the
material in question. If it is determined that a submittal has not been
approved, the PM shall immediately notify the CITY.
9. Shop Drawing Submittals: The PM shall review shop drawing and product
approvals throughout the duration of the construction period for familiarity
prior to delivery of materials. PM shall verify that CONTRACTOR is
maintaining a submittal log and conducting timely Submittals. The PM shall
receive and distribute all Contractor RFI requests, Shop Drawing requests for
approvals, and submittal requests for approvals.
10. Issuance of Non-compliance Notices: The PM shall be responsible for
notifying the CITY when he becomes aware of a condition that is believed to
be in noncompliance with Contract Documents. Anytime the PM notices a
potential construction problem or a condition that could result in non-
complying materials, equipment or workmanship the PM shall need to
determine whether the condition poses an immediate threat to public health or
safety.
11. Damage to Existing Facilities: The PM shall identify any existing facilities
damaged by the CONTRACTOR and verify that the CONTRACTOR has
notified the respective owner(s). Include record of such occurrences with
photos in the reports.
12. Change Orders: PM shall perform an independent review of any Change
Orders submitted by the CONTRACTOR and provide a written statement
noting recommendation for approval or denial of the Change Order to the
CITY. If recommended for approval, the PM shall note if the requested cost
and schedule impacts are fair and reasonable. The PM shall also participate
in change request review meetings with the CITY and CONTRACTOR to
resolve and/or negotiate the equitable resolution of request.
13. Requests for Information/Contract Document Clarification
(RFl's/CDC's): When RFI's and CDC's involve design issue interpretations,
the PM shall coordinate with the CITY as needed, to resolve the
CONTRACTOR's Requests for Information, Contract Document
Clarifications, Field Orders, and other related correspondence. The PM shall
be also be responsible for verifying that the NE CONSULTANT is providing
a written response to RFI's and CDC's in a timely matter and that they are
processing, logging, and distributing all RFI's/CDC's.
14. Schedule: PM shall review and familiarize himself with the construction
schedule, monitor the progress of construction, and ensure the
CONTRACTOR's adherence to the schedule. The CONTRACTOR shall be
required to submit a detailed construction schedule to the PM at the
preconstruction meeting and when required for submission in accordance
with the Contract Documents. This schedule shall be reviewed and approved
August 30, 2011
Page 6 of 11
by the PM and the CITY. This schedule shall be updated by the
CONTRACTOR; however, the PM shall be responsible for reviewing the
contactor's schedule to confirm accuracy of the work activities completed.
Analysis of the CONTRACTOR schedule shall be on the basis of planned
versus actual costs for the month and contract to date.
15. Pay Requisitions: PM shall verify CONTRACTOR's pay requisition
quantities. PM shall be responsible for reviewing with the CONTRACTOR
the monthly payment requisition to confirm the status of completed and
uncompleted work and stored materials. The PM shall advise the CITY of
quantities being approved for subsequent concurrence for payment purposes.
Payment Requisitions shall only be approved by the CITY with an
acknowledgement of adequacy from the PM.
16. Equipment Tests and Systems Start-up: PM shall be responsible for
coordinating various tests for quality control on the projects and verify that
equipment tests and systems start-up are conducted in the presence of
appropriate personnel, and that the CONTRACTOR maintains adequate
records thereof; and observe, record, and report appropriate details relative to
the test procedures and start-up.
17. Record Drawings: PM shall monitor that record drawing mark-ups are
properly maintained by the CONTRACTOR. At a minimum, the PM shall
review the record drawing mark-ups periodically. The CONTRACTOR's
failure to maintain the record drawings in up-to-date condition may be
deemed grounds for withholding CONTRACTOR's monthly payment
requisitions until such time as the record drawings are brought up-to-date.
The PM shall notify the CITY if he considers the mark-up documents
insufficient. The CITY shall make final determination of payment
withholding.
18. Safety: PMs shall be expected to recognize a hazard that any reasonable non-
safety professional might be expected to recognize. In addition, those safety
obligations extend only to recognizable hazards that the PM may note while
in the normal conduct of onsite business.
19. Quality Control: The PM shall review and monitor the CONTRACTOR's
adherence to an acceptable quality control program. Quality control during
construction shall be the responsibility of the CONTRACTOR; however,
oversight and ensuring the CONTRACTOR complies with applicable
jurisdictional construction standards shall be enforced on the CITY's behalf
by the PM.
20. Proceeding with Disputed Work: In the event that an agreement cannot be
reached on a Change Order, the CONTRACTOR is expected to carryon the
work and adhere to the project schedule in accordance with the contract
general conditions. The PM shall log all forced work efforts related to
August 30, 2011
Page 7 of 11
disputed change order on a Forced Work Daily Log Reports which shall be
signed and dated by the PM and the CONTRACTOR's representative at the
completion of each workday. The PM shall forward copies of this form to the
CITY for record purposes.
21. Maintenance of Traffic (MOT): The CONTRACTOR shall provide the PM
and CITY with approved copies of its MOT at the Pre-Construction meeting
and prior to the performance of any work for general information purposes.
22. Contractor Request for Services: When the CONTRACTOR requires
services from the CITY for issues such as water main shutdowns, tie-ins to
existing water mains, special regulatory inspections, etc., a request shall be
made in writing by the CONTRACTOR, and forwarded by the PM to the
CITY, a minimum of three working days prior to when required.
23. Substantial Completion/Punch List: When the CONTRACTOR considers
that the Work has reached Substantial Completion, the CONTRACTOR shall
notify the PM who shall verify that the work has progressed to the substantial
completion point in accordance the Contract Documents. If the PM is in
agreement, the PM shall contact the CITY to agree on a schedule for
conducting a substantial completion "walk-through" inspection of the Work.
PM shall attend and participate in the substantial completion "walk-through",
perform a substantial completion inspection with the CONTRACTOR, AlE
CONSULTANT and the CITY, and prepare a punch list that describes items
remaining to be completed.
24. Final Completion and Project Closeout: When the CONTRACTOR
considers that the Work has reached Final Completion, the CONTRACTOR
shall notify the PM who shall verify that the work has progressed to the Final
Completion point in accordance the Contract Documents. If the PM is in
agreement, the PM shall contact the CITY to agree on a schedule for
conducting a Final Completion "walk-through" inspection of the Work. PM
shall attend and participate in the Final Completion "walk-through" and
perform a Final Completion inspection with the CONTRACTOR, AlE
CONSULTANT and the CITY. If the work is determined to be incomplete,
PM and other attendees shall each develop a punch list of items requiring
completion or correction prior to consideration of final acceptance of each
project which shall be forwarded to the CONTRACTOR by the PM for each
project. The PM shall work with the AlE CONSULTANT and the
CONTRACTOR to ascertain materials required for the closeout binder, as
required by the CITY, and review the Operation and Maintenance manuals
for each project for completeness prior to forwarding documentation to the
CITY.
August 30, 2011
Page 8 of 11
C. CONSTRUCTION INSPECTION
CPR (Capital Project Representative's) duties and responsibilities, including
but not limited to:
1. General Coordination: The CPR, Capital Project Representative, shall
communicate daily or periodically with the CITY, the CITY's PROJECT
MANAGER and CONTRACTOR, as needed. He shall report on concerns as
it relates to the construction effort and activities. In addition, the CPR shall
also coordinate with the CITY's Public Works Department where
notifications such as utility outages, road closures, etc. may be required. The
CPR shall monitor and verify that the CONTRACTOR has made the
required notifications to the utility owners, residents and businesses as may
be required.
2. Weekly Construction Progress Meeting: The CPR shall be expected to
attend and participate in Pre-Construction Meetings with the CITY,
PROJECT MANAGER and CONTRACTOR. The CPR shall attend and
participate in weekly construction project meetings with the CITY,
PROJECT MANAGER and CONTRACTOR. These meetings shall serve as
forums to review the status of construction progress, discuss construction
issues, discuss schedule and/or cost concerns, discuss potential changes or
conflicts, review the status of shop drawing submittals and contract document
clarifications and interpretations, and to resolve problems before they become
critical. CPR shall review weekly meeting minutes distributed by PROJECT
MANAGER and two week look ahead provided by the CONTRACTOR and
provide comments or objections to written statements within the specified
timeframe.
3. Field Observations: The CPR shall conduct field observations on a part-
time basis not to exceed 560 hours throughout the duration of construction.
To supplement those services provided by the CPR, CGA shall provide a
Special Inspector sub-Consultant for inspection and certification of structural
elements, materials testing services and reports, pile monitoring, geotechnical
services and surveying. The CPR shall be present at the construction site
during the construction phase of the project. The CPR shall review and
monitor the CONTRACTOR's adherence to an acceptable quality control
program. Quality control during construction shall be the responsibility of the
CONTRACTOR; however, oversight and ensuring the CONTRACTOR
complies with applicable jurisdictional construction standards shall be
monitored on the CITY's behalfby the CPR.
4. Shop Drawing Submittals: The CPR shall review shop drawing and product
approvals throughout the duration of the construction period for familiarity
prior to delivery of materials. CPR shall work with the PROJECT
MANAGER to verify that CONTRACTOR is maintaining a submittal log
and conducting timely Submittals.
August 30, 2011
Page 9 of 11
5. Requests for Information/Contract Document Clarification
(RFl's/CDC's): When RFI's and CDC's involve design issue interpretations,
the CPR shall coordinate with the PROJECT MANAGER as needed, to
resolve the CONTRACTOR's Requests for Information, Contract Document
Clarifications, Field Orders, and other related correspondence.
6. Substantial Completion/Punch List: When the CONTRACTOR considers
that the Work has reached Substantial Completion, the CONTRACTOR shall
notify the CPR who shall verify that the work has progressed to the
substantial completion point in accordance the Contract Documents. If the
CPR is in agreement, the CPR shall contact the PROJECT MANAGER to
agree on a schedule for conducting a substantial completion "walk-through"
inspection of the Work. CPR shall attend and participate in the substantial
completion "walk-through", perform a substantial completion inspection with
the CONTRACTOR, AlE CONSULTANT and the CITY, and prepare a
punch list that describes items remaining to be completed.
7. Final Completion and Project Closeout: When the CONTRACTOR
considers that the Work has reached Final Completion, the CONTRACTOR
shall notify the CPR who shall verify that the work has progressed to the
Final Completion point in accordance the Contract Documents. If the CPR is
in agreement, the CPR shall contact the PROJECT MANAGER to agree on a
schedule for conducting a Final Completion "walk-through" inspection of the
Work. CPR shall attend and participate in the Final Completion "walk-
through" and perform a Final Completion inspection with the
CONTRACTOR, AlE CONSULTANT and the CITY. If the work is
determined to be incomplete, CPR and other attendees shall each develop a
punch list of items requiring completion or correction prior to consideration
of final acceptance of each project which shall be forwarded to the
CONTRACTOR by the CPR for each project. The CPR shall work with the
AlE CONSULTANT and the CONTRACTOR to ascertain materials required
for the closeout binder, as required by the CITY, and review the Operation
and Maintenance manuals for each project for completeness prior to
forwarding documentation to the CITY.
8. Compliance: Upon final completion, project closeout and acceptance, the
CPR shall provide a letter of compliance (Exhibit "A") to the City of Sunny
Isles Beach.
2. BASIS OF COMPENSATION
Lump sum fee of $415,655.00 plus reimbursables of $18,877.50 with a total not to exceed
amount of $434,532.50. Payments to be made monthly. This proposal is based on Prime
Consulting services and Project Management Services to address pre-construction permitting
and coordination and post-construction project closeout services and CPR for an estimated
construction duration based on the durations specified in the Project Schedule dated November
3,2010 (attached) provided by the Contractor. The Subconsultants fees are based on the tasks
August 30, 2011
Page 10 of 11
and durations presented on the Project Schedule dated November 3, 2010 (attached) provided
by the Contractor. If the construction duration runs beyond the durations shown in the
Construction Schedule, CGA may seek restitution via the potential liquidated damages
collected from the Contractor for exceeding their Contractual Schedule. Re-inspections
required due to failed inspections and/or faulty materials will be back-charged and held from
the Contractors next payment application. CGA shall be required to provide written notification
in a timely fashion when delays in the Project or changes in the Project cause the scope and/or
cost of this Agreement to change.
The Contractor must provide marine transportation from the shore to the water based
construction staging area. The Contractor shall also provide Code compliant & OSHA
compliant personnel hoisting and access to structure elements as necessary for Special
Inspector, Materials Testing and CPR field observations.
3. SUBMITTED
/ U-----
CALVrN, GIORDANO & ASSOCIATES, INe.
Submitted by:
Date:
r~
4. APPROVAL
Approved by:
Date:
Alan Cohen, City Manager
August 30, 2011
Page 11 of 11
CITY OF SUNNY ISLES BEACH
WORK AUTHORIZATION ESTIMATE DATE June 8, 2011
WORK AUTHORIZATION NO.
PROJECT NAME
DESCRIPTION
ESTIMATED DESIGN TIME
ESTIMATED CONSTRUCTION TIME
ESTIMATED CONSTRUCTION COST
TITLE
CGA Project Management & Prime Consultant
CGA Construction Inspection
SUB-CONSULTANTS
Special Inspector/Geotech Consultant
Materials Testing Services
Settlement Monitoring/Survey
Contingency
137
Total Project Management of the Newport Fishing
Pier
Complete Project Management of Contractor and
Required Sub Consultants
o
o
$0.00
I
RATE
HOURS
COST
$218,600.00
$63,485.00
$282,085.00
COST
$85,714.00
$11,428.00
$11,428.00
$25,000.00
LABOR SUBTOTAL
RE~BURSABLESUBTOTAL
TOTAL
Reviewed by:
$133,570.00
$415,655.00
$18,877.50
$434,532.50
Alan Cohen, City Manager
Exhibit "A"
LETTER OF COMPLIANCE
Date:
Alan Cohen
City Manager
City of Sunny Isles Beach
18070 Collins Ave
, Sunny Isles Beach, FL 33160
Subject: Letter of Compliance for Project #
Project Name: Newport Fishing Pier Demolition and Re-Construction
Address: Pier Park, Sunny Isles Beach, FL
Contractor: Shoreline Foundation, Inc.
This letter is to state that based on the certified reports provided to the City of Sunny Isles Beach and
Calvin, Giordano and Associates (CGA) from the Special Inspector (Firm Name), Pile Inspector (Firm
Name), Geotechnical Engineering (Firm Name) and Materials Testing Laboratory (Firm Name) and
observations made by the periodic inspections performed by CGA, the Newport Fishing Pier Project was
completed in conformance with the permit, plans and specifications.
The certified reports which were utilized by CGA to complete this letter of compliance are attached. The
demolition work on this project began on XXXXX and ended on XXXXXX. The Re-Construction portion of
the project began on XXXXX and ended on XXXX.
If you should have any further questions, please do not hesitate to contact me.
Sincerely,
Gary Craig
CEI Inspector