Loading...
HomeMy WebLinkAboutReso 2017-2655RESOLUTION NO.2017-.2155 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE ORDER NOS. 2 AND 3 WITH SOUTHERN UNDERGROUND INDUSTRIES, INC. FOR 172ND STREET DRAINAGE IMPROVEMENTS, EXTENDING THE PROJECT COMPLETION DATE FOR 60 DAYS AND INCREASING THE TOTAL CONTRACT VALUE IN AN AMOUNT NOT TO EXCEED ONE HUNDRED THOUSAND DOLLARS ($100,000.00), ATTACHED HERETO AS EXHIBIT "A'; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on May 5, 2016 via Resolution No. 2016-2555 the City awarded Bid No. 16- 04-01 to and authorized the City Manager to negotiate and enter into an Agreement with Southern Underground Industries, Inc. to provide services for 172"d Street Drainage Improvements; and WHEREAS, the City now needs to increase the original scope of work of the Agreement to include additional pipe liners and points repairs; and WHEREAS, the City Commission wishes to approve Change Order No. 2, which requests a 60 -day extension for the completion of the project due to the increased scope of work; and WHEREAS, the City Commission wishes to approve Change Order No. 3, increasing the total monetary value of the contract in an amount not to exceed One Hundred Thousand Dollars ($100,000.00) to cover the costs of the increased scope of services, bringing the total contract amount not to exceed One Million One Hundred Sixty -Three Thousand Three Hundred Six Dollars and Twenty -Five Cents ($1,163,306.25). NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Change Order Nos. 2 and 3 to the Agreement. The City Commission hereby approves Change Order Nos. 2 and 3 to the Agreement with Southern Underground Industries, Inc. for the 172"d Street Drainage Improvements, extending the completion date by 60 days, and approving an increase in an amount not to exceed One Hundred Thousand Dollars ($100,000.00) to cover the costs of the increased scope of services, bringing the total contract amount not to exceed One Million One Hundred Sixty -Three Thousand Three Hundred Six Dollars and Twenty -Five Cents ($1,163,306.25). Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 3. Effective Date. This Resolution shall become effective upon adoption. 82017- Southern Underground 172 St Drainage Imp 1st Arad Page 1 of 2 PASSED AND ADOPTED this 19th day of January 2017. George V. Scholl, Mayor ATTEST: Jane A. Hines, MMC, City Clerk APPROVED AS TO FORM Asind, FFICIENCY: y Attorney Moved by: d Seconded by: Vote: 4--d— I Mayor Scholl Vice Mayor Goldman Commissioner Aelion kk se c� Commissioner Gatto Commissioner Svechin V (Yes) (No) (Yes) (No) (Yes) (No) _(Yes) (No) 1/(Yes) (No) 82017- Southern Underground 172 St Drainage Imp 1st Amd Page 2 of 2 CITY OF SUNNY ISLES BEACH • 1, AMENDMENT NUMBER: #2 DATE: 11/17/2016 BID NUMBER: 16- 04- 01 130 931.25 ORIGINAL TOTAL CONTRACT AMOUNT: PROJECT: Sunny Isles Beach -172nd Street Drainage Improvements NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS/CONTINGENCY DRAWS: RESOLUTION NUMBER: 2016-2555 DOLLAR AMOUNT OF THIS CHANGE ORDER/CONTINGENCY DRAW: ORIGINAL BASE CONTRACT AMOUNT: $ 1,063,306.25 ORIGINAL CONTINGENCY ALLOWANCE: 130 931.25 ORIGINAL TOTAL CONTRACT AMOUNT: $ 1,063,306.25 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS/CONTINGENCY DRAWS: $ 64,847.45 DOLLAR AMOUNT OF THIS CHANGE ORDER/CONTINGENCY DRAW: $39,786.84 CREDIT /DIRECT PURCHASES: $ 0 NEW DOLLAR CONTINGENCY AMOUNT: $ 26 296.96 NEW DOLLAR CONTRACT AMOUNT: $ 1,063,306.25 ORIGINAL CONTRACT COMPLETION DATE 01/30/17 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 0 AMOUNT OF DAYS PER THIS CHANGE ORDER: 60 NEW CONTRACT COMPLETION DATE: 03/31/17 DESCRIPTION OF SCOPE OR WORK CHANGES: I Multiple conflicts were discovered in the field by the contractor between the proposed exfiltration trench and existing electrical and NMB hydrant service line. A solution was devised and approved by NMB Utility, but will require additional structures and a new fire hydrant, all of which are outside the contractor's current scope of work. NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit and delay relating to the issues set forth in this document. CONTRACTOR: Southern Underground Industries i CITY ATTORNEY: Hans Ottinot i PROJECT MANAGER: Elka Linton -Dorsett I CITY MANAGER: Christopher J. Russo O � it OF SUN A CITY OF SUNNY ISLES BEACH AMENDMENT NUMBER: #3 U NUM M: it)- U'+--Ul RESOLUTION NUMBER: 2016-2555 Egg DATE: 01/10/2017 PROJECT: Sunny Isles Beach -172nd - Street Drainage Improvements ORIGINAL BASE CONTRACT AMOUNT: 1 463 30b.25 _ ORIGINAL CONTINGENCY ALLOWANCE; 1130,931.25 ORIGINAL TOTAL CONTRACT AMOUNT; 1,063,306.25 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS CONTINGENCY DRAWS; $ 64,847.45 —...--._D.OLLAR.AMOUNT-OF THIS_CHANGE ORDER .CONTINGENCY._DRAW;.. .-10­1- -01 BUDGET IRCI A BU' ' i{7b 000.40 NEW DOLLAR CONTINGENCY AMOUNT: 12b 296.96 NEW DOLLAR CONTRACT AMOUNT: $ 1,163 306.25 ORIGINAL CONTRACT COMPLETION DATE Ol/30�17 TOTAL OF PREVIOUS CHANGE ORDER DAYS; 0 AMOUNT OF DAYS PER THIS CHANGE ORDER: 60 - NEW CONTRACT COMPLETION DATE: 03/31/17 DESCRIPTION OF SCOPE OR WORK CHANGES: _ This change order shall serve is intended to increase the overall project budget by $100,000.00. The nature of the project is such that additional materials and repairs may be needed once the damaged pipe segments are exposed, in order to ensure optimal quality and address all the of points of failure in the existing pipe, more liners and point repairs were required than were,evident.in the initial pre-bid investigation conducted by the City. Additional funding is also required for compliance with. . the SIBPD requirements for off duty support. NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit and delay rnl�tinn +n tko i-.- enh Fn.+h in Chic rirsntmont. CONTRACTOR: Southern Underground Industries -� CITY ATTORNEY: PROJECT MANAGER: Hans Ottinot Elka Linton CITY MANAGER: Christopher J. Russo (bW A City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 yPc°9j q��a4 ywY (305) 947-0606 City Hall (305) 949-3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission VIA: Christopher J. Russo, City Manager FROM: Elka Linton, Capital Projects Manager DATE: 1/19/2017 Approving Change Order Nos. 2 and 3 with Southern RE: Undergrounding for Professional Construction Services for the 172nd St Drainage Improvements Project. RECOMMENDATION: Staff recommends approval of this resolution. REASONS: Resolution 2016-2555 approved the award of Bid No. 16-04-01 to Southern Underground Industries for the 172nd St Drainage Improvements Project. The scope of work included repair and replacement of some of the existing drainage infrastructure on 172nd Street. The project is such that the exact extent of the necessary repairs cannot be fully ascertained until the damaged pipe segments have actually been uncovered. In order to address all points of failure in the existing pipe and ensure optimal quality, additional pipe liners and point repairs were required than were originally estimated in the contractor's current scope of work. Due to the increased scope of work, Change Order No. 2 requests 60 -day extension in the contract time. The new contract completion date shall be March 31, 2017. Additionally, based on the maintenance of traffic (MOT) requirements, the budget allotment for MOT also needs to be increased. Change Order No. 3 requests an increase of One Hundred Thousand Dollars ($100,000.00) to the total contract value to account for the increased 49 } scope of work, bringing the total amount not to exceed $1,163,306.25 ADDITIONAL INFORMATION: FUNDING SOURCE: Funding has been appropriated in account No. 300-5-5410-465000 ATTACHMENTS: Description Resolution Changer Order Nos. 2 and 3 Item Number: 10.D. 50 J P]