Loading...
HomeMy WebLinkAboutBid No. 16-12-02 - New HVAC Chiller Systems for Pelican Community Park City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 1 Invitation to Bid New HVAC Chiller Systems for Pelican Community Park Invitation to Bid No. 16-12-02 Advertisement Date: Thursday, December 22, 2016 Mandatory Pre-Bid Conference: Thursday, January 12, 2017 at 2:30 PM All Questions Due: Thursday, February 2, 2017 by 5:00 PM Submission due date: Wednesday, February 22, 2017 at 2:30 PM Submit to: Attn: City Clerk Sunny Isles Beach Government Center 18070 Collins Avenue Sunny Isles Beach, Florida 33160 City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 2 Table of Contents Contents: Page # Legal Advertisement/Notice to Bidder .......................................................................................... Page 3 Instructions to Bidder/General Terms and Conditions………………………………………………….Section 1, Page 4 Special Terms and Conditions .................................................................................... Section 2, Page 10 Scope of Work / Technical Specifications .................................................................... Section 3, Page 18 Submittal Forms Bid Submittal Instructions & Forms ............................................................................ Section 4, Page 21 Bid Form 1 – Bid Cover ....................................................................................................... Page 22 Bid Form 2 – Reference Questionnaire ………………………………………………………………………….. Page 24 Bid Form 3 – Minimum Requirements ……………………………………………….……………………………. Page 25 Bid Form 4 – Addenda Acknowledgement ............................................................................ Page 26 Bid Form 5 – Bid Pricing ..................................................................................................... Page 27 Affidavits & Bond Forms ........................................................................................................... Page 29 Public Entity Crimes Equal Opportunity / Affirmative Action Statement Conflict of Interest Statement Dispute Disclosure Form Anti-Kickback Affidavit Bid Bond Performance Bond Exhibits ………………………….......……………………………………………….……… Attachment (Electronic format) Plans and Reports City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 3 LEGAL ADVERTISEMENT NOTICE TO BIDDER NOTICE IS HEREBY GIVEN that the City of Sunny Isles Beach is seeking sealed Bids for the following work as specified New HVAC Chiller Systems for Pelican Community Park Invitation to Bid No. 16-12-02 The Bid Specifications for this ITB are available from DemandStar by calling (800) 711-1712 or by accessing their website at www.demandstar.com . The Bid Specifications may also be examined at the City of Sunny Isles Beach – Office of the City Clerk. Bidders who obtain the Bid Specifications from sources other than DemandStar or the City of Sunny Isles Beach are cautioned that their Bid response package may be incomplete. Addenda will be posted and disseminated by DemandStar at least five days prior to the submittal date to all Bidders who are listed on the official list. The City may not accept incomplete Bids. Bids shall be on a unit price basis; segregated Bids will not be accepted. Sealed Bids will be received by the City Clerk no later than 2:30 PM, on Wednesday, February 22, 2017 at the Sunny Isles Beach Government Center located at 18070 Collins Avenue, 4th floor, Sunny Isles Beach, Florida, 33160. Bids received after this time will not be considered. The City is under no obligation to return Bids. Timely submitted Bids will be opened publicly and read aloud at this time. The envelope containing the sealed Bid must be clearly marked: Bid No. 16-12-02 New HVAC Chiller Systems for Pelican Community Park OPENING DATE AND TIME: Wednesday, February 22, 2017 at 2:30 PM The City reserves the right to reject any or all Bids, with or without cause, to waive technical errors and informalities, and to accept the Bid, which best serves the interest of, and represents the best value to, the City in conformity with the criteria set forth in Section 62-8 of the Code of Ordinances of the City of Sunny Isles Beach. A Mandatory Pre-Bid Conference for all potential Proposers is set for 2:30PM on Thursday, January 12, 2017 in the Commission Chambers at the City of Sunny Isles Beach Government Center located at 18070 Collins Avenue, Sunny Isles Beach, Florida 33160. All questions regarding Invitation to Bid No. 16-12-02 shall be directed in writing to Jane A. Hines, MMC, City Clerk, NO LATER THAN Thursday, February 2, 2017 by 5:00 PM. Questions may be submitted via email to: JHines@sibfl.net or via facsimile (305) 792-1563 or via regular mail at: Jane A. Hines, MMC, City Clerk, City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles Beach, FL 33160. All Questions will be answered in the form of Addendum that will be released a few days after the question due date listed above. Jane Hines, MMC, City Clerk City of Sunny Isles Beach City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 4 SECTION 1 INSTRUCTIONS TO BIDDER / GENERAL TERMS AND CONDITIONS THESE INSTRUCTIONS ARE STANDARD FOR ALL BID COMMODITIES/SERVICES ISSUED BY THE CITY OF SUNNY ISLES BEACH. THE CITY OF SUNNY ISLES BEACH MAY DELETE, SUPERSEDE OR MODIFY ANY OF THESE STANDARD INSTRUCTIONS FOR A PARTICULAR CONTRACT BY INDICATING SUCH CHANGE IN SPECIAL INSTRUCTIONS TO BIDDERS OR IN THE BID SHEETS. ANY AND ALL SPECIAL CONDITIONS THAT MAY VARY FROM THE GENERAL CONDITIONS SHALL HAVE PRECEDENCE. BIDDER AGREES THAT THE PROVISIONS INCLUDED WITHIN THIS BID OR RFP SHALL PREVAIL OVER ANY CONFLICTING PROVISION WITHIN ANY STANDARD FORM CONTRACT OF THE BIDDER REGARDLESS OF ANY LANGUAGE IN BIDDER’S CONTRACT TO THE CONTRARY. 1.1 CLARIFICATION/EXPLANATION/QUESTIONS: Any questions concerning the Bid Specifications or any required need for clarification must be made to Jane A. Hines, MMC, City Clerk via email to: JHines@sibfl.net or via facsimile (305) 792-1563 or via regular mail at: Jane A. Hines, MMC, City Clerk, City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles Beach, FL 33160. Such requests for clarification/explanation or questions must be made in writing to Jane A. Hines, MMC, City Clerk, at least five (5) business days prior to the date of the Bid opening. Interpretations or clarifications considered necessary by the City will be issued by addenda and posted/disseminated by DemandStar (www.demandstar.com) to all parties listed on the official plan holders’ list as having received the Bid documents. Only questions answered by written addenda shall be binding. Oral interpretations or clarifications shall be without legal effect. No plea of ignorance or delay or required need of additional information shall exempt a Bidders from submitting their Bid on the required date and time as publicly noted. 1.2 PLAN HOLDER’S LIST: As a convenience to Proposers, the City of Sunny Isles Beach has made available via internet lists of all plan holders for each Request for Proposal, Request for Proposal, and request for qualifications. The information is available on-line at www.demandstar.com or by calling the Office of the City Clerk at (305) 792-1703. 1.3 ADDENDA TO SPECIFICATIONS: If any addenda are issued after the initial specifications are released, the City will post and disseminate the addenda through DemandStar. For those projects with separate plans, blue prints, or other materials that cannot be accessed through the internet, the Office of the City Clerk will make good faith effort to ensure that all registered Bidders (those who have been registered as receiving a Bid package) receive the documents. It is the responsibility of the Proposer prior to the submission of any Bid to check the above website or contact the Office of the City Clerk at (305) 792-1703 to verify any addenda issued. The receipt of all addenda must be acknowledged on the Bid Response Sheet. 1.4 SPECIAL ACCOMMODATIONS: Any person requiring a special accommodation at a Pre-Bid Conference or Bid/RFP/RFQ opening because of a disability should call the Office of the City Clerk at (305) 792-1703 at lease five (5) days prior to the Pre-Bid Conference or Bid/RFP/RFQ opening. If you are hearing or speech impaired, please contact the Office of the City Clerk by calling the City of Sunny Isles Beach using the Florida Relay Service which can be reached at 1(800) 955-8771 (TDD). 1.5 PUBLIC ENTITY CRIMES STATEMENT: Pursuant to the provisions of paragraph (2) (a) of section 287.133, Florida statutes -"a person or affiliate who has been placed on the convicted Proposer list following a conviction for a public entity crime may not submit a Bid on a contract to provide any goods or services to a public entity, may not submit a Bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform work as a Bidder, supplier, sub-Contractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in section 287.107, for category two for a period of 36 months from the date of being placed on the convicted Proposer list”. 1.6 BID DEADLINE: Bids must be submitted no later than the time and date shown within this document. 1.7 SEALED BID: The entire Bid Response Package shall be placed in an opaque envelope (with all items listed on the Bid checklist form and all other items required within this Request for Proposal must be executed) and submitted in a sealed envelope. 1.8 BID EXECUTION, SIGNATURES, ERASURE/CORRECTION: All Bids shall be signed in blue ink. All price quotes shall be typewritten or printed with ink. All corrections made by the Bidders prior to the opening must be initialed and dated by the Bidders. No changes or corrections will be allowed after Bids are opened. Bids must contain an original, manual signature of an authorized representative of the company. 1.9 WITHDRAWAL OF BIDS: Bidders may withdraw Bids only by written request and shall forward the withdrawal request via “Certified U.S. Mail – Return Receipt Requested” prior to the Bid opening time. Negligence on the part of the Bidders in preparing the Bid confers no right for the withdrawal of the Bid after it has been opened. 1.10 BID OPENING: Bids will be opened publicly at the time and place stated in the Notice to Bidder. It is the responsibility of the Bidders to insure that the Bid reaches the Office of the City Clerk on or before the closing hour and date stated on the Request for Proposal. After the Bid opening, the contents of the Bid Form will be made public for the information of Proposers and other interested parties who may be present either in person or by representative. Bids that are received after the Bid opening time will not be considered and will not be returned. 1.11 EVALUATION OF BIDS: The City, at its sole discretion, reserves the right to inspect any/all Bidders facilities to determine their capability of meeting the requirements for the Contract. Also, price, responsibility, and responsiveness of the Bidders, the financial position, experience, staffing, equipment, materials, references, and past history of service to the City and/or with other units of state, and/or local governments in Florida, or comparable private entities, will be taken into consideration in the Award of the Contract. City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 5 1.11.1 Hold Harmless: All Bidder’s shall hold the City, it's officials and employees harmless and covenant not to sue the City, it's officials and employees in reference to their decisions to reject, award, or not award a Bid, as applicable. 1.11.2 Cancellation: Failure on the part of the Bidders to comply with the conditions, specifications, requirements, and terms as determined by the City, shall be just cause for cancellation of the Award. 1.11.3 Disputes: If any dispute concerning a question of fact arises under the Contract, other than termination for default or convenience, the Contractor and the City department responsible for the administration of the Contract shall make a good faith effort to resolve the dispute. If the dispute cannot be resolved by agreement, then the department with the advice of the City Attorney shall resolve the dispute and send a written copy of its decision to the Bidder, which shall be binding on both parties. 1.12 AGREEMENT: After the Bid award, the City will, at its option, prepare an Agreement specifying the terms and conditions resulting from the award of this Bid. The Proposer will have ten (10) calendar days after notification of the award by the City to execute the Agreement and provide the required Performance Bond. The Bidder who has the Contract awarded to them and who fails to execute the Agreement and furnish the Performance Bond and Insurance Certificates within the specified time shall forfeit the Bid Security that accompanied their Bid, and the Bid Security shall be retained as liquidated damages by the City, and it is agreed that this sum is a fair estimate of the amount of damages the City will sustain in case the Bidder fails to enter into the Contract and furnish the Bonds as herein before provided. Bid Security deposited in the form of a cashier’s check drawn on a local bank in good standing shall be subject to the same requirements as a Bid Bond. The performance of the City of Sunny Isles Beach of any of its obligations under the agreement shall be subject to and contingent upon the availability of funds lawfully expendable for the purposes of the agreement for the current and any future periods provided for within the Bid specifications. 1.13 PAYMENTS: Payment will be made after commodities/services have been received, accepted, and properly invoiced as indicated in the contract and/or purchase order. Invoices must bear the purchase order number. 1.14 BRAND NAMES: If a brand name, make, of any "or equal" manufacturer trade name, or Proposer catalog is mentioned whether or not followed by the words "approved equal" it is for the purpose of establishing a grade or quality of material only. Proposer may offer equals with appropriate identification, samples, and/or specifications on such item(s). The City shall be the sole judge concerning the merits of items Bid as equals. 1.15 MATERIAL: Material(s) delivered to the City under this Bid shall remain the property of the seller until accepted to the satisfaction of the City. In the event materials supplied to City are found to be defective or do not conform to specifications, the City reserves the right to return the product(s) to the seller at the seller’s expense. 1.16 SAMPLES: Samples of items, when required, must be furnished by the Bidders free of charge to the City. Each individual sample must be labeled with the Bidder’s name and manufacturer's brand name and delivered by them within ten (10) calendar days of Bidders receipt of the “Notice to Proceed”, unless schedule indicates a different time. If samples are requested subsequent to the Bid opening, they should be delivered within ten (10) calendar days of the request. The City will not be responsible for returning samples. 1.17 QUANTITY GUARANTY: No guaranty or warranty is given or implied by the City as to the total amount that may or may not be purchased from any resulting Contract or Award. These quantities are for Bid purposes only and will be used for tabulation and presentation of the Bid. The City reserves the right to increase or decrease quantities as required, even significantly. The prices offered herein and the percentage rate of discount applies to other representative items not listed in this Bid. 1.18 GOVERNMENTAL RESTRICTIONS ON MATERIALS: In the event any governmental restrictions may be imposed which would necessitate alteration of the material quality, workmanship, or performance of the items offered on this Bid prior to their delivery, it shall be the responsibility of the successful Bidders to notify the City at once, indicating in their letter the specific regulation which required an alteration. The City of Sunny Isles Beach reserves the right to accept any such alteration, including any price adjustments occasioned thereby, or to cancel at no further expense to the City. 1.19 SAFETY STANDARDS: The Bidders warrant that the product(s) supplied to the City conforms in all respects to the standards set forth in the occupational safety and health act (OSHA) and its amendments. Bids must be accompanied by a materials data safety sheet (MSDS) when applicable. 1.20 WARRANTIES: Successful Bidders shall act as agent for the City in the follow-up and compliance of all items under Warranty/Guaranty and complete all forms for Warranty/Guarantee coverage under this Contract. 1.21 COPYRIGHTS/PATENT RIGHTS: Bidders warrant that there has been no violation of copyrights or patent rights in manufacturing, producing or selling of goods shipped or ordered, as a result of this Bid. The seller agrees to indemnify City from any and all liability, loss, or expense occasioned by any such violation. 1.22 LOCAL BUSINESS TAX (OCCUPATIONAL LICENSE REGISTRATION): The Bidder shall be responsible for obtaining and maintaining throughout the contract period his or her city and City local business tax receipts. Each Proposer submitting a Bid on this Request for Proposal shall include a copy of the company’s local business tax/occupational license(s) with the Bid response. For information specific to City of Sunny Isles Beach local business tax/occupational licenses, please call Code Enforcement & Licensing at (305) 792- 1705. If the Bidder is operating under a fictitious name as defined in Section 865.059, Florida Statutes, proof of current registration with the Florida Secretary of State shall be submitted with the Bid. A business formed by an attorney actively licensed to practice law in this state, by a person actively licensed by the Department of Business and Professional Regulations or the Department of Health for the purpose of practicing his or her licensed profession, or by any corporation, partnership, or other commercial entity that is actively organized or registered with the Department of State shall submit a copy of the current licensing from the appropriate agency and/or proof of current active status with the Division of Corporations of the State of Florida. 1.23 LIABILITY, INSURANCE, PERMITS AND LICENSES: Bidders shall assume the full duty, obligation, and expense of obtaining all necessary licenses, permits, inspections, and insurance required. The Bidders shall be liable for any damages or loss to the City occasioned by negligence of the Bidders (or their agent) or any person the Bidders has designated in the completion of their contract as a result of the Bid. Bidder shall be required to furnish a copy of all licenses, certificates of competency or other licensor requirements necessary to practice their profession as required by Florida State Statute, Miami-Dade City, and City of Sunny Isles Beach Code. Bidders shall include current Miami-Dade City Certificates of Competency. These documents shall be furnished to the City along City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 6 with the Bid response. Failure to furnish these documents or to have required licensure will be grounds for rejecting the Bid. 1.24 CERTIFICATE(S) OF INSURANCE: Bidders shall furnish to the Office of the City Clerk, City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles Beach, Florida 33160, certificate(s) of insurance which indicate that insurance coverage has been obtained from an insurance company authorized to do business in the State of Florida or otherwise secured in a manner satisfactory to the City, for those coverage types and amounts listed in this document, in an amount equal to 100% of the requirements and shall be presented to the City prior to issuance of any Contract(s) or Award(s) Document(s). The City of Sunny Isles Beach shall be named as "additional insured" with respect to this coverage. The required certificates of insurance shall not only name the types of policies provided, but shall also refer specifically to this Bid and section. At the time of Bid submission the Bidders must submit certificates of insurance as outlined in the General Conditions section. All required insurances shall name the City of Sunny Isles Beach as additional insured and such insurance shall be issued by companies authorized to issue insurance in the State of Florida. It shall be the responsibility of the Bidders and insurer to notify the City Manager of the City of Sunny Isles Beach of cancellation, lapse, or material modification of any insurance policies insuring the Bidders, which relate to the activities of such Proposer and the City of Sunny Isles Beach. Such notification shall be in writing, and shall be submitted to the City finance support service director thirty (30) days prior to cancellation of such policies. This requirement shall be reflected on the certificate of insurance. Failure to fully and satisfactorily comply with the city's insurance and bonding requirements set forth herein will authorize the City Manager to implement a rescission of the Bid award without further City Commission action. The Bidders hereby holds the City harmless and agrees to indemnify City and covenants not to sue the City by virtue of such rescission. 1.25 ASSIGNMENT: The Bidder shall not transfer or assign the performance required by this Bid without prior written consent of the City Manager. Any award issued pursuant to the Request for Proposal and monies which may be due hereunder are not assignable except with prior written approval of the City Manager. Further, in the event that the majority ownership or control of the Bidder changes hands subsequent to the award of this contract, Bidder shall promptly notify City in writing (via United States Postal Service – Certified Mail, Return Receipt Requested) of such change in ownership or control at least thirty (30) days prior to such change and City shall have the right to terminate the contract upon sixty (60) days written notice, at City’s sole discretion. 1.26 HOLD HARMLESS/INDEMNIFICATION: The Bidder shall indemnify, hold harmless, and defend the City of Sunny Isles Beach, it's officers, agents and employees from and against any claims, demands or causes of action of whatsoever kind or nature arising out of error, omission, negligent act, conduct, or misconduct of the Bidder, their agents, servants or employees in the provision of goods or the performance of services pursuant to this Bid and / or from any procurement decision of the City including without limitation, awarding the Contract to the Bidder. 1.27 NON-CONFORMANCE TO CONTRACT: The City of Sunny Isles Beach may withhold acceptance of, or reject items which are found upon examination, not to meet the specification requirements. Upon written notification of rejection, items shall be removed within (5) calendar days by the Proposer at their own expense and redelivered at their expense. Rejected goods left longer than thirty (30) calendar days will be regarded as abandoned and the City shall have the right to dispose of them as its own property. Rejection for non-conformance or failure to meet delivery schedules may result in the Bidder being found in default. 1.28 DEFAULT PROVISION: In case of default by the Bidders, the City of Sunny Isles Beach may procure the articles or services from other sources and hold the Bidders responsible for any excess costs occasioned or incurred thereby. 1.29 SECONDARY/OTHER PROPOSERS: The City reserves the right in the event the primary Proposer cannot provide an item(s) or service(s) in a timely manner as requested, to seek other sources without violating the intent of the Contract. 1.30 DEFINITIONS: Wherever used in these General Conditions or in the other Contract Documents, the following terms shall have the meaning indicated which shall be applicable to both the singular and plural thereof: Acceptance: Acceptance by the City of the Work as being fully complete in accordance with the Contract Documents subject to waiver of claims. Agreement: The written Agreement between the City and the Bidder covering the Work to be performed, which includes the Contract Documents. Addenda: Written or graphic instruments issued prior to the Bid Opening which modify or interpret the Contract Documents, Drawings and Specifications, by addition, deletions, clarifications or corrections. Approved: Means approved by the City. Bid: The offer of the Bidders submitted on the prescribed form setting forth the prices for the Work to be performed. Bidders: Any person, firm or corporation submitting a Bid for Work. Bonds: Bid, performance bond and other instruments of security, furnished by the Bidder and their surety in accordance with the Contract Documents and in accordance with the law of the State of Florida. Change Order: A written order to the Bidder signed by the City authorizing an addition, deletion or revision in the Work, or an adjustment in the Contract Price or the Contract Time issued after execution of the Agreement. City: City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles Beach, Florida 33160. Contract Documents: Contract Documents shall include, Instructions to Bidders, Bidder's Bid, the Bonds, the Notice of Award, the Agreement between the City and Bidder as well as any addenda thereto, these General Conditions, Special Conditions, the Technical Specifications, Drawings and Modifications, Notice to Proceed, Request for Proposal, Insurance Certificates, Change Orders and Acknowledgment of Conformance with the City of Sunny Isles Beach. Contract Price: The total monies payable to the Bidder under the Contract Documents. Contract Time: The number of calendar days stated in the Agreement for the completion of the Work. City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 7 Contracting Officer: The individual who is authorized to sign the contract documents on behalf of the City’s governing body. Bidder: The person, firm or corporation with whom the City has executed this Agreement. Day: A calendar day of twenty-four hours measured from midnight to the next midnight. Field Order: A written order issued by the City which clarifies or interprets the Contract Documents or orders minor changes in the Work. Modification: Modification means any one of the following: (a) a written amendment of the Contract Documents signed by both parties, (b) a Change Order, (c) a written clarification or interpretation if issued by the City, or (d) a written order for minor change or alteration in the Work issued by the City. A modification may only be issued after execution of the Agreement. Notice of Award: The written notice by City to the apparent successful Bidders stating that upon compliance with the conditions precedent to be fulfilled by him within the time specified, City will execute and deliver the Agreement to him. Samples: Physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. Specifications: Those portions of the Contract Documents consisting of written technical descriptions of materials, equipment, construction systems, standards and workmanship as applied to the Work. Statement of Services: The form furnished by the City which is to be used by the Bidder in requesting progress payments. Supplier: Any person or organization who supplies materials or equipment for the Work, including that fabricated to a special design, but who does not perform labor at the site. Work: Any and all obligations, duties and responsibilities necessary to the successful completion of the Project assigned to or undertaken by Bidder under the Contract Documents, including all labor, materials, equipment and other incidentals, and the furnishing thereof. Written Notice: The term “Notice” as used herein shall mean and include all written notices, demands, instructions, claims, approvals and disapproval’s required to obtain compliance with Contract requirements. Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or to an authorized representative or such individual, firm, or corporation, or if delivered at or sent by registered mail to the last business address known to them who gives the notice. Unless otherwise stated in writing, any notice to or demand upon the City under this Contract shall be delivered to the City. 1.31 BID AWARD: The City reserves the right to reject any and all Bids at its sole discretion. Bids shall be awarded by the City after the City performs all necessary searches, inquiries, exploration, and analysis of the Bids. The Bid shall be awarded to the lowest responsible and responsive Bidder whose Bid best serves the interests of and represents the best value to the City in conformity with the criteria set forth in Section 62-8 of the City Code. No Notice of Award will be given until the City has concluded any investigation(s) as they deem necessary to establish the Bidder’s capability to perform the Services as described in this RFP, ITB, RFQ or ITQ, as substantiated by the required professional experience, client references, technical knowledge and qualifications; and sufficient labor and equipment to comply with the City’s established standards, as well as the financial capability of the Bidder to perform the Work in accordance with the Contract Documents to the satisfaction of the City within the time prescribed. The City reserves the right to reject the Bid of any Bidders on the basis of these queries and investigations and who does not meet the City’s satisfaction, even though the firm may be the lowest dollars and cents Bid. In analyzing Bids, the City will also take into consideration client references, past work experience and work product, proven ability to satisfactorily perform. If the Contract is awarded, the City will issue the Notice of Award and give the successful Bidders a Contract for execution within ninety (90) days after opening of Bids. The City specifically reserves the right to award the contract to a Bidder who is not necessarily the lowest dollars and cents Bidders on the basis of the results of these queries and investigation(s). 1.32 EXECUTION OF AGREEMENT: At least four counterparts of the Agreement, the Performance Bond, the Certificates of Insurance and such other Documents as required by the Contract Documents shall be executed and delivered by Bidder to the City within ten (10) calendar days of receipt of the Notice of Award. 1.33 LAWS AND REGULATIONS: The Bidder will give all notices and comply with all laws, ordinances, rules and regulations applicable to the Work. If the Bidder observes that the Specifications are at variance therewith, they will give the City prompt written notice thereof, and any necessary changes shall be adjusted by an appropriate modification. If the Bidder performs any Work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the City, they will bear all costs arising wherefrom. 1.34 TAXES: The City of Sunny Isles Beach is exempt from sales tax imposed by the State and/or Federal Government. Florida Sales Tax Exemption No. 85-8012694687C-4 appears on each purchase order. Exemption certificates are available upon request. 1.35 DUTY TO DEFEND, INDEMNIFY AND SAVE HARMLESS: In consideration of the separate sum of twenty-five dollars ($25.00) and other valuable consideration, the Bidder shall defend, indemnify and hold harmless the City, its officers, agents and employees, from or on account of any injuries or damages, received or sustained by any person or persons during or on account of any operations connected with the Work described in the Contract Documents, or by or in consequence of any negligence in connection with the same; or by use of any improper materials or by or on account of any act or omission of the said Bidder or his Sub-Bidder, agents, servants or employees. The Bidder will defend, indemnify and hold harmless the City and their agents or employees from and against all claims, damages, losses and expenses including attorneys' fees arising out of or resulting from the performance of the Work, provided that any such claim damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than Work itself) including the loss of use City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 8 resulting wherefrom and (b) is caused in whole or in part by any negligent act or omission of the Bidder, Sub-Bidder, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused by a party indemnified hereunder. In the event that a court of competent jurisdiction determines that Sec. 725.06 (2), F.S. is applicable to this Work, then in lieu of the above provisions of this section the parties agree that Bidder shall indemnify, defend and hold harmless the City, their officers and employees, to the fullest extent authorized by Sec. 725.06 (2) F.S., which statutory provisions shall be deemed to be incorporated herein by reference as if fully set forth herein. In the event that any action or proceeding is brought against City by reason of any such claim or demand, Bidder, upon written notice from City shall defend such action or proceeding by counsel satisfactory to City. The indemnification provided above shall obligate Bidder to defend at its own expense or to provide for such defense, at City’s option, any and all claims of liability and all suits and actions of every name and description that may be brought against City, excluding only those which allege that the injuries arose out of the sole negligence of City, which may result from the operations and activities under this Contract whether the Work be performed by Bidder, its Sub-Bidders, or by anyone directly or indirectly employed by either. 1.36 DECISIONS ON DISAGREEMENTS: The City will be the initial interpreter of the Technical Specifications. 1.37 CITY MAY TERMINATE: If the Bidder is adjudged bankrupt or insolvent, or if they make a general assignment for the benefit of their creditors, or if a trustee or receiver is appointed for the Bidder or for any of their property, or if they file a petition to take advantage of any debtor’s act, or to reorganize under bankruptcy or similar laws, or if they repeatedly fails to supply sufficient skilled workmen or suitable materials or equipment, or if they repeatedly fail to make prompt payments to Sub-Contractors or for labor, materials or equipment or they disregard laws, ordinances, rules, regulations or orders of any public body having jurisdiction, or if they disregard the authority of the City, of if they otherwise violate any provision of, the Contract Documents, then the City may, without prejudice to any other right or remedy and after giving the Bidder and the surety ten (10) days written notice, terminate the services of the Bidder and take possession of the Project and of all materials, equipment, tools, construction equipment and machinery thereon owned by the Bidder, and finish the Work by whatever method they may deem expedient. In such case the Bidder shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds the direct and indirect costs of completing the Project, including compensation for additional professional services, such excess shall be paid to the Bidder. If such costs exceed such unpaid balance, the Bidder will pay the difference to the City. Such costs incurred by the City will be determined by the City and incorporated in a Change Order. If after termination of the Bidder under this Section, it is determined by a court of competent jurisdiction for any reason that the Bidder was not in default, the rights and obligations of the City and the Bidder shall be the same as if the termination had been issued pursuant to this document. 1.37.1 Where the Bidder’s services have been so terminated by the City said termination shall not affect any rights of the City against the Bidder then existing or which may thereafter accrue. Any retention or payment of moneys by the City due the Bidder will not release the Bidder from liability. 1.37.2 Upon ten (10) days written notice to the Bidder, the City may, without cause and without prejudice to any other right or remedy, elect to terminate the Agreement. In such case, the Bidder shall be paid for all Work executed and accepted by the City as of the date of the termination. No payment shall be made for Work which has not been performed. 1.38 MISCELLANEOUS: Bidders acknowledge the following miscellaneous conditions: 1.38.1 Whenever any provision of the Contract Documents requires the giving of written notice it shall be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to them who gives the notice. 1.38.2 The Contract Documents shall remain the property of the City. The Bidder shall have the right to keep one record set of the Contract Documents upon completion of the Project. 1.38.3 The duties and obligations imposed by these General Conditions, Special Conditions and Supplemental Conditions and the rights and remedies available hereunder, and, in particular but without limitation, the warranties, guarantees and obligations imposed upon Bidder and those in the Special Conditions and the rights and remedies available to the City, shall be in addition to, and shall not be construed in any way as a limitation of, any rights and remedies available by law, by special guarantee or by other provisions of the Contract Documents. 1.38.4 Should the City or the Bidder suffer injury or damage to its person or property because of any error, omission, or act of the other or of any of their employees or agents or others for whose acts they are legally liable, claim shall be made in writing to the other party within a reasonable time of the first observance of such injury or damage. 1.39 WAIVER OF JURY TRIAL: City and Bidder knowingly, irrevocably voluntarily and intentionally waive any right either may have to a trial by jury in State or Federal Court proceedings in respect to any action, proceeding, lawsuit or counterclaim based upon the Contract Documents or the performance of the Work there under. 1.40 GOVERNING LAW, VENUE AND WAIVER OF JURY TRIAL: It is agreed that this Agreement shall be governed by, construed and enforced in accordance with the laws of the State of Florida. In the event it becomes necessary for either party to initiate legal action regarding this Agreement venue shall be in the Eleventh Judicial Circuit in and for Miami Dade County, Florida, for any claims under state law and in the Southern District of Florida, Miami Division, for any claims brought in federal court. If either party utilizes such legal action, including appeals, if necessary, to enforce this Agreement, the prevailing party shall be entitled to recover its reasonable attorney’s fees and costs at the pretrial, trial and appellate levels. Each of the parties hereto hereby knowingly, voluntarily and intentionally, waives the right which any party may have to a jury trial in respect of any action, proceeding, litigation or counterclaim based hereon or arising out of, under, on or in connection with this Agreement or any course of conduct, course of dealing, statements (whether verbal or written) or actions of either of party. 1.41 PROJECT RECORDS: City shall have right to inspect and copy during regular business hours at City’s expense, the books and records and accounts of Bidder which relate in any way to the Project, and to any claim for additional compensation made by Bidder, and to conduct an audit of the financial and accounting records of Bidder which relate to the Project. Bidder shall retain and make available to City all such books and records and accounts, financial or otherwise, which relate to the Project and to any claim for a period of three years following final completion of the Project. During the Project and the three year period following final completion of the Project, Bidder shall provide City access to its books and records upon five days written notice. City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 9 1.42 SEVERABILITY: If any provision of the Contract or the application thereof to any person or situation shall to any extent, be held invalid or unenforceable, the remainder of the Contract, and the application of such provisions to persons or situations other than those as to which it shall have been held invalid or unenforceable shall not be affected thereby, and shall continue in full force and effect, and be enforced to the fullest extent permitted by law. 1.43 INDEPENDENT BIDDER The Bidder is an independent Bidder under the Contract. Services provided by the Bidder shall be by employees of the Bidder and subject to supervision by the Bidder, and not as officers, employees, or agents of the City. Personnel policies, tax responsibilities, social security and health insurance, employee benefits, purchasing policies and other similar administrative procedures, applicable to services rendered under the Contract shall be those of the Bidder. End of Section City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 10 Section 2 Special Terms and Conditions 2.1 PURPOSE OF BID The City of Sunny Isles Beach (the “City”) intends to establish a contract by means of sealed bids, with a qualified firm for the parts, furnishing and installation of a new HVAC Chiller system at the Pelican Community Park located at 18118 North Bay Road, Collins Avenue Florida 33160, in accordance with the prescribed specifications and requirements. 2.2 PRE-BID CONFERENCE A Mandatory pre-bid conference will be held on 01/12/2017 at 2:30 PM at Sunny Isles Beach Government Center, 18070 Collins Avenue, Sunny Isles Beach, FL 33160; 1 st Floor Conference Room to discuss the special conditions and specifications included within this solicitation . Those who fail to attend this mandatory pre-bid conference will not be considered by the City and their bid will be rejected. A site walk-thru will be conducted immediately following the pre -bid conference to allow bidders to gain familiarity with the site and the existing infrastructure. Bidders are requested to bring this solicitation document to the conference, as additional copies may not be available. 2.3 CONTRACT TIME Contractor shall obtain Final Completion of all Work within one hundred and twenty (120) calendar days from the date stated in the Notice to Proceed issued by the City Manager or his/her designee. The Work shall be completed by the Final Completion date specified in the Notice to Proceed, whichever occurs first. 2.4 METHOD OF AWARD Award, if any, shall be made in accordance with Section 1.31 of the General Terms and Conditions. 2.5 BID PRICE If a Bidder is awarded a contract under this solicitation, the Bid Price shall remain fixed and firm during the contract term. 2.6 PERFORMANCE AND PAYMENT BOND The City of Sunny Isles Beach shall require the successful Bidder to furnish a Performance Bond and Payment Bond in the amount of 100% of the total Bid Price, with the City of Sunny Isles Beach as the Obligee, as security for the faithful performance of the Contract and for the payment of all persons performing labor or furnishing materials in connection herewith within ten (10) calendar City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 11 days after issuance of the Notice of Award by the City. The Performance and Payment Bond shall continue in effect through the contract term. The bonds shall be with a surety company authorized to do business in the State of Florida and having been in business with a record of successful continuous operation for at least five (5) years. 2.7 BID BOND The City of Sunny Isles Beach shall require that every Bidder furnish a bid bond in the amount of 5% of the total bid price. 2.8 INSURANCE 2.8.1 Comprehensive General Liability Insurance Comprehensive General Liability with minimum limits of One Million Dollars ($1,000,000.00) per occurrence combined single limit for Bodily Injury Liability and Property Damage Liability. Coverage must be offered in a form no more restrictive than the latest edition of the Comprehensive General Liabi lity policy, without restrictive endorsements, as filed by the Insurance Services Office, and shall specifically include the following with minimum limits not less than those required for Bodily Injury Liability and Property Damage Liability:  Premises and Operation;  Independent Contractors;  Products and/or Completed Operations Hazard;  Broad Form Property Damage;  Broad Form Contractual Coverage applicable to this specific Contract, including any hold harmless and/or indemnification agreement.  Personal Injury Coverage with Employee and Contractual Exclusions removed, with minimum limits of coverage equal to those required for Bodily Injury Liability and Property Damage Liability. 2.8.2 Business Automobile Liability Business Automobile Liability with minimum limits of One Million Dollars ($1,000,000.00) per occurrence combined single limit for Bodily Injury Liability and Property Damage Liability. Coverage must be afforded on a form no more restrictive than the latest edition of the Business Automobile Liability policy, without restrictive endorsements, as filed by the Insurance Services Office, and must include:  Owned Vehicles;  Hired and Non-Owned Vehicles;  Employers’ Non-City ship. Before starting the Work, the Bidder will file and make sure that all certificates of insurance required by this document and by the Contract are in the City’s possession. These certificates shall contain a provision that the coverage afforded under the policies will not be canceled or materially changed until at least thirty (30) days prior written notice has City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 12 been given to the City by certified mail. The City shall be named as an additional insured on the above-referenced policies. The Bidder agrees that if any part of the Work under the Contract is sublet, they will require the Sub-Contractor(s) to carry insurance as required, and that they will require the Sub - Contractor(s) to furnish to them insurance certificates similar to those required by the City in this section. 2.8.3 Worker’s Compensation Insurance Worker's Compensation Insurance for statutory obligations imposed by Worker's Compensation or Occupational Disease Laws, including, where applicable, the United States Longshoremen's and Harbor Worker's Act, the Federal Employers’ Liability Act and the Homes Act. Employer's Liability Insurance shall be provided with a minimum of One Hundred Thousand and 00/100 dollars ($100,000.00) per accident. Bidder agrees to be responsible for the employment, conduct and control of its employees and for any injury sustained by such employees in the course of their employment 2.8.4 Cancellation and Re-Insurance If any insurance should be cancelled or changed by the insurance company or should any insurance expire during the period of this contract, the Consultant shall be responsible for securing other acceptable insurance to provide the coverage specified in thi s section to maintain coverage during the life of this Contract. All deductibles must be declared by the Bidder and must be approved by the City. At the option of the City, either the Bidder shall eliminate or reduce such deductible or the Bidder shall procure a Bond, in a form satisfactory to the City, covering the same. NOTE: THE CITY OF SUNNY ISLES BEACH, CONTRACT NUMBER AND TITLE MUST APPEAR ON EACH CERTIFICATE OF INSURANCE. THE CITY OF SUNNY ISLES BEACH MUST BE SHOWN AS AN ADDITIONAL INSURED WITH RESPECT TO THIS COVERAGE. 2.9 PAYMENTS Invoices shall be provided in accordance with Section 1.13 of the General Terms and Conditions. The City’s payment terms are net 30 (within 30 days of invoice receipt date without discounts). Invoices shall be supported with detailed information and mailed to: City of Sunny Isles Beach Capital Projects Manager 18070 Collins Ave, 3rd Floor Sunny Isles Beach, FL 33106 The City may withhold, in whole or in part, payment to such extent as may be necessary to protect itself from loss on account of: Defective Work not remedied. Failure of Contractor to make payments properly to Subcontractors or for material or Labor. Damage to another contractor not remedied. City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 13 Liquidated damages and costs incurred by City and/or Consultant for extended construction administration. Failure of Contractor to provide any and all documents required by the Contract Documents. 2.10 LABOR, MATERIALS, AND EQUIPMENT SHALL BE SUPPLIED BY THE CONTRACTOR Unless otherwise provided in Section 3 of this solicitation the Contractor shall furnish the following, including but not limited to, all labor, materi al, equipment, barricading, Maintenance of Traffic (MOT) inclusive of any required off duty police officers, adequate supervision, and coordination for satisfactory contract performance. When not specifically identified in the technical specifications, such materials and equipment shall be of a suitable type and grade for the purpose and meeting or exceeding all permit or industry standard requirements. All material, workmanship, 100% design, testing and equipment shall be subject to the inspection and approval of the City Manager or his designated representative for this project. 2.11 CLEAN-UP All unusable materials and debris shall be removed from the premises at the end of each workday, and disposed of in an appropriate manner. No equipment, material, debris, trailers or other items may be stored in any location outside of the provided constr uction easements without written approval from the City and the property owner. Upon final completion, the Contractor shall thoroughly clean up all areas where work has been involved as mutually agreed with the City. 2.12 FEDERAL, STATE AND LOCAL REGULATIONS The successful Bidder shall comply with all federal, state and local ordinances, regulations, rules and permits as well as any other laws that would apply to the services being provided. The Bidder’s costs associated with regulatory requirements shall be included in the bid whether depicted specifically or not within the body of the ITB. 2.13 MATERIALS SHALL BE NEW AND WARRANTED AGAINST DEFECTS The Bidder hereby acknowledges and agrees that all materials, except where recycled content is specifically requested, supplied by the Bidder in conjunction with this solicitation and resultant contract shall be new, warranted for their merchantability, and fit for a particular purpose. In the event any of the materials supplied to the City by the Contractor are found to be defective or do not conform to specifications: (1) the materials may be returned to the Contractor at the Contractor’s expense and the contract cancelled or (2) the City may require the Contractor to replace the materials at the Contractor’s expense. No provisions or allotments for delays or time extensions to the schedule as a result of “defective”, unacceptable material, or reused material found shall be granted. In the event that material is suspected by the City of being reused or not new in original packaging, the material may be rejected. The Contractor shall remove such material and replace it at his/her cost and within the original schedule. No provisions or allotments for delays or time extensions to City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 14 the schedule as a result of “defective”, unacceptable material, or reused material found shall be granted. 2.14 NOTIFICATION TO BEGIN WORK SHALL BE GIVEN THROUGH A NOTICE TO PROCEED The Contractor shall neither commence any work, nor enter a City work premise, until a written Notice to Proceed (NTP) directing the Contractor to proceed with the work has been received by the Contractor from the City Manager or his designee representative; provided however, that such notification shall be superseded by any emergency work that may be required in accordance with provisions included elsewhere in this solicitation and resultant contract. In addition to the written NTP, the Contractor must supply the City with the required insurance and bond documents. 2.15 ACCIDENT PREVENTION AND BARRICADES Barricades, cones, construction fencing, temporary construction fencing and off duty police officers, per City regulations and other relevant requirements, shall be pro vided by the Contractor when work is performed in areas traversed by persons, vehicular traffic or when deemed necessary by the City Manager or his designee at no extra cost to the City. CONTINUOUS OFF-DUTY POLICE SUPPORT SHALL BE REQUIRED FOR ALL WORK RESULTING IN MODIFICATIONS TO THE EXISTING TRAFFIC FLOW PATTERNS INCLUDING BUT NOT LIMITED TO LANE CLOSURES AND DETOURS OR WHERE OTHERWISE REQUESTED BY THE CITY. Contractor shall comply with City, State and Federal regulations and permit requirements for the placement of the proper Traffic Control Devices. Precautions shall be exercised at all times for the protection of persons and property. All services performed under this contract shall conform to all relevant regulations as prescribed in the current edition of the Manual of Uniform Traffic Control Devices (MUTCD), the Florida Department of Transportation’s Design Standards (DS) and OSHA during the course of such effort. Where requirements vary or conflict, the more stringent shall apply. Any fines levied by the above mentioned authorities for failure to comply with these requirements shall be borne solely by the Contractor. 2.16 DELIVERY & PROTECTION OF MATERIAL AND EQUIPMENT All material must be F.O.B. delivered. The Contractor is solely liable and responsible for the purchase, delivery, and installation of all materials and equipment. The contractor will make all arrangements for delivery. Contractor will be solely liable for receiving, inspecting, accepting, and replacing any damaged materials or equipment and filing any and all claim with suppliers or transporters. Contractor is responsible for the protection of all materials and equipment from adverse weather conditions, damage, deterioration, and theft until the Work has been acce pted by the City. City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 15 2.17 WARRANTY SHALL BE SUPPLIED IN WRITTEN FORM 2.17.1 Type of Warranty Coverage Required The Contractor shall provide a copy of its written warranty certificates at contract close- out. The warranty supplied by the Contractor shall remain in force for the full period; regardless of whether the Contractor is under contract with the City at the time of defect. Any payment by the City on behalf of the goods or services received from the Contractor does not constitute a waiver of these warranty provisions. Contractor’s warranties shall be one (1) year from final completion, backed by a warranty bond and shall include all delivery, labor, material, and equipment for the correction, replacement, reinstallation, and/or removal of defective and/or unacceptable work. Warranties for specific components of the work shall be provided separately and on fabricators or manufacturers original letterhead with original signatures. 2.17.2 Correcting Defects Covered Under Warranty The Contractor shall be responsible for promptly correcting any deficiency, at no cost to the City, within seven (7) calendar days after the City notifies the Contractor of such deficiency in writing. If the Contractor fails to satisfy the warranty within the period specified in the notice, the City may (a) place the Contractor in default of its contract, and/or (b) procure the products or services from another source and charge the Contractor for any additional costs that are incurred by the City for this work or items; either through a credit memorandum or through invoicing. 2.18 DEFICIENCIES IN WORK TO BE CORRECTED BY THE PROPOSER The Contractor shall promptly correct all apparent and latent deficiencies and/or defects in work, and/or any work that fails to conform to the contract documents regardless of project completion status. All corrections shall be made within seven (7) calendar days aft er such rejected defects, deficiencies, and/or non-conformances are verbally reported to the Contractor by the City's project administrator, who may confirm all such verbal reports in writing. The Contractor shall bear ALL costs of correcting such rejected work. If the Contractor fails to correct the work within the period specified, the City may, at its discretion, notify the Contractor, in writing, that the Contractor is subject to contractual default provisions if the corrections are not completed to t he satisfaction of the City within seven (7) calendar days of receipt of the notice. If the Contractor fails to correct the work within the period specified in the notice, the City shall place the Contractor in default. 2.18 (A) Notice of Default-Opportunity to Cure Where an Event of Default (“Default”) occurs under the Contract, the City may at its sole discretion notify the Contractor, specifying the basis for such Default, and advising the Contractor that such Default must be cured within a time frame specified by the City; or, the Contract with the City may be terminated. The City is under no obligation to issue such notification. The City may grant an extension to the cure period if the City deems it appropriate and in the best interest of the City, without waiver of any of the City’s rights hereunder. The City, at its sole discretion, may have a default corrected by its own forces City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 16 or another contractor and any such costs incurred will be deducted from any sums due the Contractor under any contract with the City. 2.19 FURNISH AND INSTALL REQUIREMENTS The specifications and/or statement of work contained within this solicitation describe the various functions and classes of work required as necessary for the completion of the work. Any omissions of inherent technical functions or classes of work within the specifications and/or statement of work shall not relieve the Contractor from furnishing, installing or performing such work where required to the satisfactory completion of the project. 2.20 LICENSES, PERMITS AND FEES The Contractor shall obtain and pay for all licenses, permits and inspec tion fees required for this project; and shall comply with all laws, ordinances, regulations and building code requirements applicable to the work contemplated herein. Damages, penalties and or fines imposed on the City or the Contractor for failure to obtain required licenses, permits or fines shall be borne by the Contractor. 2.21 LIQUIDATED DAMAGES FOR INCOMPLETE PROJECTS The Contractor is obligated and guarantees to complete the Project in the time set forth in the Contract or any approved extension of time the Contractor may be granted by the City Manager. The Contractor will be notified in writing of any approved exceptions or extensions by the City Manager. Failure to complete the project in accordance with the specifications and to the satisfaction of the City within the time stated for substantial and/or final completion shall cause the Contractor to be subject to charges for liquidated damages for each and every calendar day the work remains incomplete beyond these deadlines. The liquidated damages amounts are as follows: Original Contract Amount Daily Charge Per Calendar Day $250,000 but less than $500,000 .................................................................................... $1,074 $500,000 but less than $2,500,000 ................................................................................. $1,742 As compensation due to the City for loss of use and for additional costs incurred by the City due to such non-completion of the work, the City shall have the right to deduct the said liquidated damages from any amount due, or that may become due to the Contractor under this agreement, or to invoice the Contractor for such damages if the costs incurred exceed the amount due to the Contractor. 2.22 FRAUD AND MISREPRESENTATION The City may terminate this Contract based on any attempt by the Contractor to meet its contractual obligations with the City through fraud, misrepresentation or material misstatement. Should this occur the Contractor will be responsible for all direct or indirect costs associated with termination or cancellation of the Contract. City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 17 2.23 BACKGROUND CHECKS The successful Firm will be responsible for hiring the necessary personnel to conduct the specified services and will comply with all federal, state, and local laws related to minimum wage, social security, nondiscrimination, Americans with Disabilities Act (“ADA”), unemployment compensation, and workers’ compensation. All staff assigned to this contract shall be required, at their sole cost and expense, to pass a criminal background check prior to award of the contract. The criminal background check shall consist of a Florida Department of Law Enforcement (“FDLE”) Florida Crime Information Center/National Crime Information Center (“FCIC/NCIC”) criminal records check. Any employee not meeting this requirement will not be permitted to work at any City facility. 2.24 WEEKLY PROGRESS REPORTS The City shall require that the Contractor attend weekly progress meetings and provide reports on the status of the project. The report shall include at the minimum the following information;  Background on the project itself  Discussion of the achievements since last reporting  Discussion of problems that have arisen  Discussion of work that lies ahead  Two week look ahead schedule  Update on estimated schedule and budget completion 2.25 TAXES Contractor must pay all applicable sales, consumer, use and other taxes required by law. Contractor is responsible for reviewing the pertinent state statutes involving state taxes and complying with all requirements. END OF SECTION City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 18 Section 3 Scope of Work / Technical Specifications SCOPE OF WORK The Scope of Work consists of providing all labor, materials, means of transportations, equipment necessary and all the required consulting engineer services for replacing the existing chiller, two alternate chilled pumps and the 250A service to serve new chiller load. Coordination with the City and other parties involved is required if any other circumstances happen during the work unspecified by this Contract Documents. The Contractor has ultimate responsibility to perform work in accordance with all rules and regulations that pertain to the industry which work is performed. MINIMUM REQUIREMENTS - The following minimum requirements will be considered in the review of each bidder’s responsiveness. Failure to meet or exceed minimum re quirements will disqualify bidder from consideration. 1. Licensure / Certification. The primary contractor does not need to hold GC license. However, each sub-contractor must be licensed in their respective fields. In addition, the contractor may provide proof of the following licenses/certificates, Miami-Dade County Air Conditioning Mechanical Journeyman license or Florida Certified HVAC Contractors License, or a Certificate of Competency from the Miami-Dade County’s Construction Trades Qualifying Board as a HVAC Contractor. Current licenses must be provided with bid, and no personnel shall service City facilities without said licenses. 2. Similar Experience. Bidder shall demonstrate previous experience in regards to the requirements of this solicitation for a period of no less than five (5) years in providing these services to at least one government agency in the Tri-County area (Miami-Dade, Broward, Palm Beach). 3. Bidder’s References. Bidders are to include a minimum of three (3) references from contractors or projects the Bidder considers of a similar, size, scope and complexity. The attached form found in Section 4 is to be used and is to be included with the Bid submission. 4. SUBCONTRACTORS: If one or more subcontractors are to be used, the subcontractor must be clearly identified and noted in the submittal when it is submitted. The City must approve any changes in the use of subcontractors in advance and in writing. No such approval will be construed as making the City a party to such subcontract, or subjecting the City to liability of any kind to any subcontractor. No subcontra ctor will under any circumstances relieve the Respondent of its liability and obligation under any resulting contract. Subcontractor is subject to the same contractual conditions as is the Respondent. City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 19 TECHNICAL SPECIFICATIONS 1. The Pelican Community Park facility shall remain fully functional and operable at all times. During the replacement period of the existing chillers, will be required a temporary chiller service. The Temporary chiller shall be installed and full operational prior to the disabling of the existing chillers. The mechanical contractor shall include the cost of the temporary chiller service including its installation, operation, and removal. Prior to initiating work, the successful bidder shall coordinate with the City to determine potential salvageability of any existing system components. 2. The assembled chiller shall be completely capable of begin serviced and repaired in place without the need of removal of a module. 3. The chiller shall have performance equal to or greater than that scheduled. Please refer to the attached plans prepared by Florida Engineering Services (FES) dated April 19, 2016 for detailed specifications. 4. As requested by the Building Department, Engineered Shoring/Bracing Plans and Shop Drawings shall be provided by the Contractor as part of the permit requirements. 5. The Contractor shall be responsible for furnishing all labor, materials, equipment and tools and shall provide all mechanical work, electrical work, low voltage wiring, insulation work, controls, legal disposal of existing equipment, hosting permits, etc. 6. Work performed under this contract including finished products shall conform and adhere to all applicable standards and specifications in the field. All the engineering documents and the resulting installation of the HAVAC Chiller replacement, must be conform to the following codes and standards: a. FLORIDA BUILDING CODE 5TH ED. (2014) b. FLORIDA BUILDING CODE MECHANICAL 5TH ED. (2014) c. FLORIDA ENERGY CONSERVATION CODE 5TH ED. (2014) d. FLORIDA FIRE PREVENTION CODE 5TH ED. (2014) e. ASHRE 2009 FUNDAMENTALS HANDBOOK 7. The Contractor shall be solely responsible for obtaining all permits and licenses required to perform the scope of work, including but not limited to the City of Sunny Isles Beach and any other State, Local or Federal entities. City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 20 8. The Contractor shall submit its proposed plan and method for performing the Work described herein including a list of equipment and personnel anticipated to be used. 9. EQUIPMENT – All Equipment shall conform with and be installed per manufacturer’s instructions, specifications, and recommendations for safe and efficient operations. All manufacturer operation and maintenance guides shall be issued to the building operator after successful completion of new system installation. 9.1 Each system component shall be permanently marked with manufacturer's identification showing: a. Manufacturer b. Capacity c. Service Rating. d. Type, Grade or Class of Each Item as Applicable e. Certification of Approval if Applicable 10. A third party Commissioning Agent shall be retained by the City for this project (The Commissioning agent services are not a part of this scope of services.) END OF SECTION City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 21 Section 4 Bid Submittal Instructions & Forms BID DATES & TIMES Advertisement of Bid: December 22, 2016 Mandatory Pre-Bid Conference followed by Site-Walk: January 12, 2017 2:30pm Last Day for any questions/clarification: February 2, 2017 5:00pm Bid Due & Opening: February 22, 2017 2:30pm Note: All dates/times are subject to change at the City’s discretion. BID PACKET Bidders must include the following Bid Forms, Bonds & Affidavits and in the following order: Bid Form 1.. .............................................................. Bid Cover Bid Form 2………………………………..……… Reference Questionnaire Bid Form 3………………………………….…….. Minimum Requirements Bid Form 4 ................................... …Addenda Acknowledgement Bid Form 5 ............................................................... Bid Pricing Affidavit............................................................... Non-Collusion Affidavit...................................................... Public Entity Crimes Affidavit.............................. Equal Opportunity/Affirmative Action Affidavit........................................................ Conflict of Interest Affidavit........................................................ Dispute Disclosure Affidavit................................................................ Anti-Kickback BID SUBMITTAL Submit one (1) original, four (4) copies, and one (1) electronic file (CD, clearly labeled with solicitation number or USB flash drive) in a sealed envelope addressed to the City Clerk at: Attn: City Clerk City of Sunny Isles Beach 18070 Collins Ave., 4th Floor Sunny Isles Beach, FL 33160 The sealed envelope must clearly state: IMPORTANT, BID ENCLOSED Bid No. 16-12-02 New HVAC Chiller Systems for Pelican Community Park OPENING DATE AND TIME: February 22, 2017 at 2:30PM City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 22 BID FORM 1 BID COVER Bid Title: New HVAC Chiller Systems for Pelican Community Park THE UNDERSIGNED BIDDER PROPOSES AND AGREES, IF THIS BID IS ACCEPTED, TO ENTER INTO AN AGREEMENT WITH THE CITY OF SUNNY ISLES BEACH TO PERFORM AND FURNISH ALL WORK AS SPECIFIED OR INDICATED IN THE CONTRACT DOCUMENTS FOR THE CONTRACT PRICE AND WITHIN THE CONTRACT TIME INDICATED IN THIS BID AND IN ACCORDANCE WITH THE OTHER TERMS AND CONDITIONS OF THE CONTRACT DOCUMENTS. The Bidder accepts all of the terms and conditions of the ITB and Instructions to Bidders, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Bidder agrees to sign and submit the Agreement and other documents required by this ITB within ten days after the date of the City’s Notice of Award. IN SUBMITTING THIS BID, THE BIDDER REPRESENTS, AS MORE FULLY SET FORTH IN THE AGREEMENT, THAT:  The Bidder has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work.  The Bidder has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Bidder.  This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; the Bidder has not solicited or induced any person, firm or corporation to refrain from Bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidders or over the City. The Bidder understands and agrees that the Bid is for unit prices to furnish and install individual Work Items for maintenance and/or repair work, complete in place. Estimates are provided for the purpose of Bid evaluation and to establish unit prices for individual Work Items for maintenance and/or repair work to be contracted by the City under individual Purchase Orders, based on the unit prices established under this Bid. The City and the successful Bidder will establish completion times for each individual Work Item and the successful Bidder agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and/or Notice to Proceed. Exact Legal Company Name: ______________________________________________________________ Business Name (dba), if any: ______________________________________________________________ City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 23 Street Address: __________________________________________________________________________ Mailing Address (if different): ________________________________________________________________ Telephone No.: ______________________________________________________ Fax No.: ___________________________________________________________ Email Address: ______________________________________________________ FEIN No.: __________________________________________________________ *By signing this document the bidder agrees to all Terms Authorized Signature: ________________________________________________ Print Name: ________________________________________________________ Title: ______________________________________________________________ THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF BIDDER TO BE BOUND BY THE TERMS OF ITS BID. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE BID NON- RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY BID THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE BIDDER TO THE TERMS OF ITS OFFER. City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 24 BID FORM 2 Reference Questionnaire To Whom It May Concern Subject: Reference Letter for Bid No. 16-12-02 for New HVAC Chiller Systems for Pelican Community Park Name of Bidder/Proposer: ___________________________________________________ The above referenced Contractor is submitting a bid for a solicitation that has been issued by the City of Sunny Isles Beach. We require that the Contractor provide written references with their submission. By providing you with this document the Contractor is requesting that you provide the following reference information. We would appreciate you providing the information requested below as well as any other information your feel is pertinent. Title of Contract: Scope of work: _____________________________________________________________ Value of Contract $_______________ Was the work performed timely? Yes No Was the work performed timely & to acceptable quality standards? Yes No Have there been any repairs required under the warranty? Yes No Would you enter into a contract with the Contractor in the future? Yes No If no to any of the above, please provide details: _________________________________________________________________________ __________________________________________________________ ______________ _____________________________________________________________ _________ Comments: _________________________________________________________________________ _____________________________________________________________ _________ _____________________________________________________________ _________ Thank you for your assistance in helping us in evaluating our bid solicitation. Name of individual completing this form:_______________________________________ Agency:_____________________________ Title:______________________________ Telephone:________________________ E-mail: _________________ _______ Signature:_____________________________ Date: _____________________________ Sincerely, Genesis Cuevas Purchasing Agent City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 25 BID FORM 3 Minimum Requirements LICENSES, TRAININGS AND CERTIFICATIONS OF CONTRACTOR AND SUBCONTRACTORS Please include in this section. City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 26 BID FORM 4 ADDENDA ACKNOWLEDGEMENT INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS ITB Addendum #1, Dated Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS RFQ FIRM NAME: __________________________________________________________________________ SIGNATURE: ______________________________________________ TITLE: __________________________________________ DATE: ________________ City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 27 BID FORM 5 BID PRICING BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS INCLUDING ALL LABOR, EQUIPMENT, SUPERVISION, TESTING AND PERMITTING TO PROVIDE A COMPLETE TURN-KEY PROJECT CONFORMING TO THE REQUIREMENTS DETAILED BY THE SPECIFICATIONS, MANUFACTURER, OWNER, STATE, FEDERAL AND LOCAL AGENCIES FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. WORK INCLUDES BUT IS NOT LIMITED TO GENERAL, ELECTRICAL AND MECHANICAL CONSTRUCTION. BID ITEM # DESCRIPTION UNIT EST. QUANTITY UNIT COST EXTENDED COST Temporary Chiller System 1. Temporary Chiller service required during the replacement period of the existing chillers (including installation, operation, and removal) LS 1 $ $ Subtotal of Temporary Chiller System $ Demolition of Existing HVAC Chiller Systems 2. Removal of existing modular Air Cooled Chiller LS 1 $ $ 3. Removal of existing Pumps LS 1 $ $ Subtotal of New HVAC Chiller Systems $ New HVAC Chiller Systems 4. New Chiller CH-1 (see schedule notes on M-2) to installed on a new modified structural concrete pad including but not limited too new two alternate chilled water pumps, piping, and the upgrade of the 200A service of existing panel to a new 250A service new chiller load (see schedule notes on E-1) LS 1 $ $ Subtotal of New HVAC Chiller Systems $ City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 28 5. New Air Conditioning vent in PCP Gymnasium for recently converted storage room which will ultimately house an office for 2 full-time and several part time personnel. (currently no AC in unit) LS 1 $ $ Subtotal of New PCP Gymnasium Office $ PROJECT CLOSE OUT 6. As-built record drawings (electronic AutoCAD &PDF format and hard copy) LS 1 $ $ Subtotal of Project Close Out $ BID SUBTOTAL (1 – 6) $ CONTINGENCIES 7. Project Contingency (To be used at the sole discretion and direction of the Owner) 1 15% $ 8. Permit Allowance 1 $15,000 $15,000 BID TOTAL (1 – 8): $ City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 29 AFFIDAVITS 1 of 10 2 of 10 3 of 10 4 of 10 ˆ ˆ 5 of 10 6 of 10 7 of 10 8 of 10 PERFORMANCE BOND 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 FORM OF PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS: That, pursuant to the requirements of Florida Statute 255.05, we, _______________________________________, as Principal, hereinafter called Contractor, and ________________________, as Surety, are bound to the City of Sunny Isles Beach, Florida, as Obligee, hereinafter called City, in the amount of ________________________________ Dollars ($ _____________) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally. WHEREAS, Contractor has by written agreement entered into a Contract, Bid/Contract No.: ______________, awarded the day of , 20 , for _______________________________________ in accordance with contract documents prepared by the City of Sunny Isles Beach, which Contract is by reference made a part hereof, and is hereafter referred to as the Contract; THE CONDITION OF THIS BOND is that if the Contractor: 16.1. Fully performs the Contract between the Contractor and the City for _________________________________ (Bid No. ______________) within calendar days after the date of Contract commencement as specified in the Notice to Proceed and in the manner prescribed in the Contract; and 16.2. Indemnifies and pays City all losses, damages (specifically including, but not limited to, damages for delay and other consequential damages caused by or arising out of the acts, omissions or negligence of Contractor), expenses, costs and attorney's fees including attorney's fees incurred in appellate proceedings, that City sustains because of default by Contractor under the Contract; and 16.3. Upon notification by the City, corrects any and all defective or faulty Work or materials which appear within one and one half (1 1/2) years, and: 16.4. Performs the guarantee of all Work and materials furnished under the Contract for the time specified in the Contract, then this Bond is void, otherwise it remains in full force. Whenever Contractor shall be, and declared by City to be, in default under the Contract, the City having performed City’s obligations thereunder, the Surety may promptly remedy the default, or shall promptly: 16.4.1. Complete the Contract in accordance with its terms and conditions; or 16.4.2. Obtain a Bid or Bids for completing the Contract in accordance with its terms and conditions, and upon determination by Surety of the best, lowest, qualified, responsible and responsive Bidder, or, if the City elects, upon determination by the City, and Surety jointly of the best, lowest, qualified, responsible and responsive Bidder, arrange for a Contract between such Bidder and City, and make available as Work progresses (even though there should be a default or a succession of defaults under the Contract or Contracts of completion arranged under this paragraph) sufficient funds to pay the cost of completion less the balance of the Contract Price; but not exceeding, including other costs and damages for which the Surety may be liable hereunder, the amount set forth in the first paragraph hereof. The term "balance of the Contract Price." as used in this paragraph, shall mean the total amount payable by City to Contractor under the Contract and any amendments thereto, less the amount properly paid by City to Contractor. No right of action shall accrue on this Bond to or for the use of any person or corporation other than the City named herein. The Surety hereby waives notice of and agrees that any changes in or under the Contract Documents and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Surety's obligation under this Bond. Signed and sealed this day of , 20 . WITNESS: BY: (Name of Corporation) _________________________ Secretary (Signature) (CORPORATE SEAL) (Type Name and Title Signed Above) IN THE PRESENCE OF; INSURANCE COMPANY: BY: *Agent and Attorney-in-Fact * (Power of Attorney must be attached) (Address) ______________________________ (City/State/Zip Code) ______________________________ (Telephone) STATE OF FLORIDA COUNTY OF _________________________ The foregoing instrument was acknowledged before me this _____ day of __________________, 20____, by _________________________________________________________ [name of person], as __________________________________ [type of authority], for ________________________________ [name of party on behalf of whom instrument was executed]. AFFIX NOTARY STAMP HERE: ______________________________________ Signature: Notary Public – State of Florida ______________________________________ Print or Type Commissioned Name Personally Known __________ OR Produced Identification __________ Type of Identification Produced ________________________________ City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 Attachments EXHIBITS NEW HVAC CHILLER SYSTEMS FOR PELICAN COMMUNITY PARK 18118 NORTH BAY ROAD CITY OF SUNNY ISLES BEACH, FL  FBC 2014 WIND LOAD EXPOSURE CALCS FOR MULTISTACK ASP-60X CHILLER MODULES PAGES INCLUDING COVER 19 ORIGINAL SUBMITTAL DATED MAY 17, 2016 PREPARED BY: BLANEY ENGINEERING, INC. Consulting Structural Engineers 1040 Woodcock Road, Suite 214 Orlando, FL 32803 Ph: 407.894.8910 Fx: 407.894.8911 CA#27231 www.blaneyengineering.com SALAM Y. BLANEY, PE FL PE#59263 SUMMARY The following calculations were performed for the Multistack ASP-60X Chiller Modules in accordance to the 2014 Florida Building Code. The purpose of the calculations is to provide a rational analysis showing that the unit will maintain its integrity during a wind event. The calculations show the required amount of screws it will take to transfer the wind loads to the unit’s base frame. These calculations do not address the required connection of the unit to the roof curb and the main building structure (by others). Because we are not concerned with the serviceability of the units after the wind event, deflection and stress checks were not performed for its components. The main purpose is to provide screw and attachment requirements so that the unit does not come apart and will be connected together adequately. The following design parameters were used:  5/16”-18 bolts (Grade 5 SAE J429) by Fastenal and ¼” fillet welds.  Side Panel of the unit is 20 gage steel  Fan Panel of the unit is 20 gage steel  Top Panel of the unit is 20 gauge steel  Fy = 36 ksi min for all unit steel used (Fu = 58 ksi min)  175 miles per hour winds – 3 sec gust (Risk Category II)  Exposure Category C  Mean Roof Height above grade equal to 30 ft or less Note: Connection of unit to the curb and main structure are not included in these pages and are designed by others. During regular maintenance all screws and panels will be checked for corrosion. Any corroded screws are to be replaced with one that is equivalent in durability and strength. Any corroded panels shall be repaired and/or replaced with one that is equivalent in durability and strength. All screws that are removed in order to access inside of unit must be refastened. Pelican Community Park City of Sunny Isles Beach, FL Page 2 of 19 Wind Load Calculation Pelican Community Park City of Sunny Isles Beach, FL Page 3 of 19 PROJECT PROJECT NO.NO. SUBJECT BY DATE OF V = 175 Directionality Factor Kd =0.9 Exposure Category C Topographic Factor Kzt =1 Mean Building Height = ft Velocity Pressure Exposure Coefficien Kz =0.94 Velocity Pressure =psf (strength design) =psf (ASD Design) 5/12/2016 Wind loads have been determined in accordance with Florida Building Code (FBC) 2014 Chapter 1609.1 Applications and Chapter 1609.1.1 Determination of wind loads Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads prescribed herein. Decreases in wind loads shall not be made for the effect of shielding by other structures. Blaney Engineering, Inc.CMH Solutions, Inc.2016_019 1040 Woodcock Road Suite 214 Orlando, FL 32803 Tel: 407.849.8910 Fax: 407.849.8910 offices@blaneyengineering.com Pelican Community Park Miami-Dade County, FL ASCE 7-10 Wind Load Calculation SYB qz = 0.00256 Kz Kzt Kd V2 66.33 qz x 0.6 39.8 Chapter 1609.1.1 Determination of Wind Loads Wind loads on every building or structure shall be determined in accordance with Chapters 26 to 30 of ASCE 7 or provisions of the alternate all-heights method in Section 1609.6. Wind shall be assumed to come from any horizontal direction and wind pressures shall be assumed to act normal to the surface considered. Wind load determined from ASCE-10 Chapter 29 - Wind Loads on Other Structures and Building Appurtenances - MWFRS Basic Wind Speed mph 25 Pelican Community Park City of Sunny Isles Beach, FL Page 4 of 19 Methodology for Rational Analysis Pelican Community Park City of Sunny Isles Beach, FL Page 5 of 19 Pelican Community Park ASP-60X Pelican Community Park ASP-60X Module Case 1 - wind parallel to unit length (wind on end panel) Case 2 - wind perpendicular to unit length (wind on side panel) Cabinet Dimensions Height (H)90 inches Width (W) 84 inches Length 84 inches Net Weight (Wt) 2300 lbs Wind Parameters - See MECA WindOutput Wind Pressure 39.8 psf GCf 1.9 Design Wind Pressure (p)75.6 psf Tributary Areas Side Panel (width) -Af1 52.5 square feet Rear Panel (length) - Af2 52.5 square feet Roof Panel - Af3 49.0 square feet Design Wind Forces on the Unit Case 1 - F1 (against side panel)3970.1 lbs Case 2 - F2 (against rear panel)3970.1 lbs Uplift on Top Panel of unit - F3 2925.3 lbs Check Corner Member to L2.5x2.5x1/4 Attachments CONN OK Therefore: Capacity of 3/8" bolts in pullout/pullover = 1373.00 lbs 0.7 screws 1.0 screws Check Welded Frame CONN OK Therefore: Worst case loading on weld = F1/4 = 992.51 lbs Loading from overturning of unit (see Unit Calc) = 1449.73 lbs Total Load = Pn = 2442.24 lbs Minimum length of weld =2.0 in Thickness of thinnest welded sheet =0.25 in 5.47 kips/in ASD Safety Factor = =2.55 Total Weld Capacity = P = 4.29 kips City of Sunny Isles, FL FBC 1620.6 and ASCE 7 29.5.1 states that uplift on units shall be applied simultaneously with the normal force. For the uplift GCf shall be reduced from 1.9 to 1.5 Per drawings provided by Multistack, 12 gage corner member attaches directly to 1/4" angle w/ minimum 3/4" dia washer Per drawings provided by Multistack, internal support frame is welded together Transverse weld capacity per Table IV-1 from AISI manual (see attached) = Pn' = Number of screws required at each corner member (top & bottom) = Pelican Community Park City of Sunny Isles Beach, FL Page 6 of 19 PROJECT PROJECT NO.NO. SUBJECT BY DATE OF T=F3 xW F2 xH 0.6 xWtxW T=lb 22 2 == bolts bolts == bolts bolts == bolts bolts 5/12/2016 H/ 2 Blaney Engineering, Inc.CMH Solutions, Inc.2016_019 1040 Woodcock Road Suite 214 Orlando, FL 32803 Tel: 407.849.8910 Fax: 407.849.8910 offices@blaneyengineering.com Pelican Community Park Miami-Dade County, FL Unit Calculations SYB T +-2899.5 W Overturning Check F3 W/2 F2 Wt Total fasteners provided per Multistack = 16 Side Panels Sliding Check # of screws req'd from panel to base F2/2 5.8 Screw allowable shear into 14 gage base metal 6.0 # of screws req'd from panel to base F1 11.7 Screw allowable shear into 14 gage base metal 12.0 Total fasteners provided per Multistack = 16 Total fasteners provided per Multistack = 22 Rear Panel Sliding Check Side Panel Check for Pressure # of screws req'd from panel to base mtl (1/8" min) F1 8.4 Screw allowable pullout into 1/8" base metal 9.0 Rear Panel Check for Pressure Pelican Community Park City of Sunny Isles Beach, FL Page 7 of 19 PROJECT PROJECT NO.NO. SUBJECT BY DATE OF5/12/2016 Blaney Engineering, Inc.CMH Solutions, Inc.2016_019 1040 Woodcock Road Suite 214 Orlando, FL 32803 Tel: 407.849.8910 Fax: 407.849.8910 offices@blaneyengineering.com Pelican Community Park Miami-Dade County, FL Unit Calculations SYB == bolts bolts Panel size = 42 x 42 = == bolts bolts use minimum of 4 bolts Panel size = 84 x 12 = == bolts bolts use minimum of 4 bolts == bolts bolts Total fasteners provided per Multistack = 22 # of screws req'd from panel to base mtl (1/8" min) F2 16.8 Screw allowable pullout into 1/8" base metal 17.0 Members supporting Fan Guards Check # of screws req'd from memb to base F3/4 x 50% Screw allowable pullout into 1/8" base metal 1.9 2.0 Top Panels (Fan Guards) Pressure Check 1764 in 2 # of screws req'd from panel to base p x Panel Size x 50% open 1.4 Screw allowable pullout into 1/8" base metal 2.0 Front Panels Pressure Check 1008 in 2 # of screws req'd from panel to base p x Panel Size 1.3 Screw allowable pullout into 1/4" gage base metal 2.0 Pelican Community Park City of Sunny Isles Beach, FL Page 8 of 19 Unit Data Pelican Community Park City of Sunny Isles Beach, FL Page 9 of 19 A LL F A S T E N E R S U S E D S H A L L B E A MI N I M U M 5 / 1 6 " U N L E S S O T H E R W I S E NO T E D . CORNER M E M B E R S H A L L B E INCREASED F R O M 1 6 G A G E TO M I N 1 2 G A G E ; C O N N E C T A T E A E N D O F M E M B E R W I T H A T L E A S T 3 / 8 " D I A B O L T W I T H MIN 3 / 4 " D I A W A S H E R ; T Y P A LL ( 4 ) C O R N E R M E M B E R S PL E A S E V E R I F Y T H A T RE A R P A N E L ( S ) H A V E A TO T A L O F 2 2 B O L T S A S IN D I C A T E D A LL S I D E P A N E L A TTACHMENTS SHALL I N C L U D E A MINIMUM 3 / 4 " D I A WASHER Pe l i c a n Co m m u n i t y Pa r k Ci t y of Su n n y Is l e s Be a c h , FL Page 10 of 19 Fasteners Requirements Pelican Community Park City of Sunny Isles Beach, FL Page 11 of 19 PROJECT PROJECT NO.NO. SUBJECT BY DATE OF The following values will control over the individual capacity of the steel bolts/screws The shear force on a screw shall not exceed the least of: 1) 2 D t1 =lb 3) =lb where, = ksi where, =ksi D= in =in D= in =in = = 2) 2 D t2 =lb where, = ksi D= in =in = Pull-Out The nominal pull-out strength, Pnot for pulling a screw out of a threaded part, is: 1)For tc <= 0.125 in Ks D tc =lb where, =in = ksi Ks = 0.12 Gage Fan Guard to 1/8" Steel SYB 5/12/2016 CMH Solutions, Inc.2016_019 Pelican Community Park Miami-Dade County, FL 5/16"x18 Bolt Capacity Ftu1 1088 for t2 <= t1 nu 4.2 (t2 3D)1/2 Ftu2 2006 ns Ftu1 (Sheet Steel)58 Tensile ultimate strength of member in contact with screw head Ftu2 (1/8" stl)58 Tensile ultimate strength of member not in contact with screw head0.3125 t1 (thickness of member in contact with the screw head) 0.12 0.3125 t2 (thickness of member not in contact with the screw head)nu (factor of safety on ultimate strength) 4 ns (safety factor)3 0.125 nu (factor of safety on ultimate strength) 4 Ftu2 1133 nu Ftu2 (1/8" stl) 58 Tensile ultimate strength of member not in contact with screw head Fty2 1688 tc is depth of full thread engagement of screw into t2 not including tapping or drilling point Fty2 (1/8" stl) 36 0.3125 t2 (thickness of member not in contact with the screw head) Tensile yield strength of member not in contact with the screw head 1.2 Blaney Engineering, Inc. 1040 Woodcock Road Suite 214 Orlando, FL 32803 Tel: 407.849.8910 Fax: 407.849.8910 offices@blaneyengineering.com 0.125 0.125 Pelican Community Park City of Sunny Isles Beach, FL Page 12 of 19 PROJECT PROJECT NO.NO. SUBJECT BY DATE OF0.12 Gage Fan Guard to 1/8" Steel SYB 5/12/2016 CMH Solutions, Inc.2016_019 Pelican Community Park Miami-Dade County, FL 5/16"x18 Bolt Capacity Blaney Engineering, Inc. 1040 Woodcock Road Suite 214 Orlando, FL 32803 Tel: 407.849.8910 Fax: 407.849.8910 offices@blaneyengineering.com 2)For 0.038 in <= tc <= 2/n where n = number of threads per unit length for a screw n = therefore, 2/n = 0.111 Ks D tc =lb where, =in = ksi Ks = Pull-Over The nominal pull-over strength, Pnov, for pulling connected material over the head of a screw or washer C t1 =lb where, =in = ksi = =in =in 18 Fty2 1688 tc is depth of full thread engagement of screw into t2 not including tapping or drilling point Fty2 (18 gage stl) 36 Tensile yield strength of member not in contact with the screw head 1.2 Fty2 (Dws - Dh) 659 0.12 Fty2 (Sheet Steel) 36 Tensile yield strength of member not in contact with the screw head C is coefficient dependent on screw locations 0.7 Dws larger of the nominal washer diameter and the screw head 0.468 Dh nominal hole diameter 0.25 0.125 t1 (thickness of member in contact with the screw head) Pelican Community Park City of Sunny Isles Beach, FL Page 13 of 19 PROJECT PROJECT NO.NO. SUBJECT BY DATE OF The following values will control over the individual capacity of the steel bolts/screws The shear force on a screw shall not exceed the least of: 1) 2 D t1 =lb 3) =lb where, = ksi where, =ksi D= in =in D=in =in = = 2) 2 D t2 =lb where, = ksi D= in =in = Pull-Out The nominal pull-out strength, Pnot for pulling a screw out of a threaded part, is: 1)For tc <= 0.125 in Ks D tc =lb where, =in = ksi Ks = Blaney Engineering, Inc.CMH Solutions, Inc.2016_019 1040 Woodcock Road Suite 214 Orlando, FL 32803 Tel: 407.849.8910 Fax: 407.849.8910 offices@blaneyengineering.com Pelican Community Park Miami-Dade County, FL 5/16"x18 Bolt Capacity 20 Gage Panel to 1/8" Steel SYB 5/12/2016 Ftu1 340 for t2 <= t1 nu 4.2 (t2 3D)1/2 Ftu2 2006 ns Ftu1 (Sheet Steel)58 Tensile ultimate strength of member in contact with screw head Ftu2 (1/8" stl)58 Tensile ultimate strength of member not in contact with screw head0.3125 t1 (thickness of member in contact with the screw head) 0.3125 t2 (thickness of member not in contact with the screw head) 0.125 nu (factor of safety on ultimate strength) 4 ns (safety factor)3 Ftu2 1133 nu Ftu2 (1/8" stl) 58 Tensile ultimate strength of member not in contact with screw head 0.3125 t2 (thickness of member not in contact with the screw head) 0.125 nu (factor of safety on ultimate strength) 4 Fty2 1688 tc is depth of full thread engagement of screw into t2 not including tapping or drilling point 0.125 Fty2 (1/8" stl) 36 Tensile yield strength of member not in contact with the screw head 1.2 0.0375 Pelican Community Park City of Sunny Isles Beach, FL Page 14 of 19 PROJECT PROJECT NO.NO. SUBJECT BY DATE OF Blaney Engineering, Inc.CMH Solutions, Inc.2016_019 1040 Woodcock Road Suite 214 Orlando, FL 32803 Tel: 407.849.8910 Fax: 407.849.8910 offices@blaneyengineering.com Pelican Community Park Miami-Dade County, FL 5/16"x18 Bolt Capacity 20 Gage Panel to 1/8" Steel SYB 5/12/2016 2)For 0.038 in <= tc <= 2/n where n = number of threads per unit length for a screw n = therefore, 2/n = 0.111 Ks D tc =lb where, =in = ksi Ks = Pull-Over The nominal pull-over strength, Pnov, for pulling connected material over the head of a screw or washer C t1 =lb where, =in = ksi = =in =in 18 Fty2 1688 tc is depth of full thread engagement of screw into t2 not including tapping or drilling point 0.125 C is coefficient dependent on screw locations 0.7 Fty2 (18 gage stl) 36 Tensile yield strength of member not in contact with the screw head 1.2 Fty2 (Dws - Dh) 473 Dws larger of the nominal washer diameter and the screw head 0.750 Dh nominal hole diameter 0.25 0.0375t1 (thickness of member in contact with the screw head) Fty2 (Sheet Steel) 36 Tensile yield strength of member not in contact with the screw head Pelican Community Park City of Sunny Isles Beach, FL Page 15 of 19 PROJECT PROJECT NO.NO. SUBJECT BY DATE OF The following values will control over the individual capacity of the steel bolts/screws The shear force on a screw shall not exceed the least of: 1) 2 D t1 =lb 3) =lb where, = ksi where, =ksi D= in =in D=in =in = = 2) 2 D t2 =lb where, = ksi D= in =in = Pull-Out The nominal pull-out strength, Pnot for pulling a screw out of a threaded part, is: 1)For tc <= 0.125 in Ks D tc =lb where, =in = ksi Ks = Blaney Engineering, Inc.CMH Solutions, Inc.2016_019 1040 Woodcock Road Suite 214 Orlando, FL 32803 Tel: 407.849.8910 Fax: 407.849.8910 offices@blaneyengineering.com Pelican Community Park Miami-Dade County, FL 3/8" Bolt Capacity 12 Gage corner to 1/4" Steel SYB 5/12/2016 Ftu1 1185 for t2 <= t1 nu 4.2 (t2 3D)1/2 Ftu2 6216 ns Ftu1 (Sheet Steel)58 Tensile ultimate strength of member in contact with screw head Ftu2 (1/8" stl)58 Tensile ultimate strength of member not in contact with screw head0.3750 t1 (thickness of member in contact with the screw head) 0.109 0.3750 t2 (thickness of member not in contact with the screw head) 0.25 nu (factor of safety on ultimate strength) 4 ns (safety factor)3 Ftu2 2719 nu Ftu2 (1/8" stl) 58 Tensile ultimate strength of member not in contact with screw head 0.3750 t2 (thickness of member not in contact with the screw head) 0.25 nu (factor of safety on ultimate strength) 4 Fty2 4050 tc is depth of full thread engagement of screw into t2 not including tapping or drilling point 0.25 Fty2 (1/8" stl) 36 Tensile yield strength of member not in contact with the screw head 1.2 Pelican Community Park City of Sunny Isles Beach, FL Page 16 of 19 PROJECT PROJECT NO.NO. SUBJECT BY DATE OF Blaney Engineering, Inc.CMH Solutions, Inc.2016_019 1040 Woodcock Road Suite 214 Orlando, FL 32803 Tel: 407.849.8910 Fax: 407.849.8910 offices@blaneyengineering.com Pelican Community Park Miami-Dade County, FL 3/8" Bolt Capacity 12 Gage corner to 1/4" Steel SYB 5/12/2016 2)For 0.038 in <= tc <= 2/n where n = number of threads per unit length for a screw n = therefore, 2/n = 0.111 Ks D tc =lb where, =in = ksi Ks = Pull-Over The nominal pull-over strength, Pnov, for pulling connected material over the head of a screw or washer C t1 =lb where, =in = ksi = =in =in 18 Fty2 4050 tc is depth of full thread engagement of screw into t2 not including tapping or drilling point 0.25 0.7 Fty2 (18 gage stl) 36 Tensile yield strength of member not in contact with the screw head 1.2 Fty2 (Dws - Dh) 1373 Dws larger of the nominal washer diameter and the screw head 0.750 Dh nominal hole diameter 0.25 t1 (thickness of member in contact with the screw head) 0.1090 Fty2 (Sheet Steel) 36 Tensile yield strength of member not in contact with the screw head C is coefficient dependent on screw locations Pelican Community Park City of Sunny Isles Beach, FL Page 17 of 19 P e l i c a n C o m m u n i t y P a r k C i t y o f S u n n y I s l e s B e a c h , F L P a g e 1 8 o f 1 9 Pelican Community Park City of Sunny Isles Beach, FL Page 19 of 19