Loading...
HomeMy WebLinkAboutZurqui114'' ZURQUI Construction Services, Inc PROPOSALRFP N0.1 1 -10 -01 DESIGN STRUCTURES RESS A ®HE ITAGEI PARK AND GOOLDEN SHORES PARK i ZURQUI Construction Services, Inc 111 Project Overview PHONE & FAX + 305- 221 -6100 + 305- 221 -6110 Executive Summary PROJECT MANAGER I EMAIL Eddy Gonzales Jr Eddy @zurquis.com Zurqui Construction Services, Inc. is pleased to furnish :his proposal tc the ci :v of Sunny :sles for the design, construction, and installation of two sail shade /canopy stnlctures to be positioned at Heritage Park and Golden Shores Park in Sunny isles Beach Florida, 3316C. This proposal is a culmination of a comprehensive cost evaluation to the city of Sunny 'isles for the design, construction, and installation of shade /canopy structures described in this proposal, The implemented study and subsequent proposal includes an extensive site examina :ion of similar shade/canopy structures in the area and analysis of Heritage Park and Golden Shores Park historical site cla :a. To the greatest extent feasible, we have attempted to respond to the city's desire for a competitive proposal for the shade /canopy structures described herein. Our proposal and implementation of this project encompasses all compulsory dGCUmen :a :ion, property surveys and plans, acquiring all permits required by the City and County agencies, and any additional information necessary for the successful design, construction, and ins :allation of shade /canopys.ructures described inthisproposal. The implementation and comple :ion of this prcjec: is proposed at S381,500 for the design, construction, and installation of shade/cancpy structures solicited by the city and proposed for both sites described herein. Complete proposal cost derails and itemized costs for Heritage Park and Golden Shores Parks canopies are furnished in sec-ion 5 (Price Proposal). This comprehensive RFP proposal is categorized into eight K81 main sections: Section Company ;nformation Section 2— Qualifications, Relevant Experience, and Past Performance Section 3- Staffing Experience and Qualified Key Personnel Section 4- Approach and Pile :hoclology Section 5- Detailed Price Proposal Section 6 - References furnished for three (31 On -going and Past Clients Section 7- Proposed Schedule and Work Plan to Complete the Services Section 8- Completed RFP (Sec :icn 6) Bid Submittal Contract Forms &V President Zurqui Consruc :ion Services, Inc. I-) ZURQUI t i Construction Services, Inc Zurqui Construction Services, Inc. 9755 S.W. 40t" Terrace Miami, FL 33165 PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com Company Information Phone: (305) 221 -6100 Fax: (305) 221 -6110 EmaiI:VicentePzurguics.com/ Company Web site: w%"v.Zurquics.com About Us Zurqui Construction Services, Inc.(ZCS) isa family operated State Certified General contractorthat was fcUnded by Eddy Gonzalez, Jr., and incorporated in Miami, FL in 1989. 0urfoundation is centered on iclecIcgiesofimpeccableser vices, quality workman ship, and outstanding client relationships.0urfirm has over 100 years of collective practice in the construction industryancl continues in the development of its construction processes to meet and exceed the challenges of its clients. ZCS is proud tc offer excellence in the follo, : ✓ing general contracting service areas: • Govemmental Park and Recreation Agencies • Commercial Construction • Schools and Universities • Residential • Hospitals Our Vision Our vision is to be recognized as "The Fines." and most experience ccnsTruction Services Company in Flericla. ZCS believes thatcustomers cleser✓eand should expect outstandingservice and professionalism. We value cur clients input and provide every client with personalized responsiveness. By involving clients in the decision making process, we work together tc develop a consensus of realistic expectations, budgetary constraints, and formulate a solid construction schedule that all parties can agree upon. '0.e pay strict attention to de tails, meet deadlines, adhere to censtruc ion schedules and budgets, and successfully complete projects per specifications and plans. Outstanding litigation We take pride in all cur construction services and are delighted tc publicize that ZCS does not, and has neverhad any cutstancling litigation, mediation crarbitration involvement by our firm, againstourfirm, against sub - consultants, or against any project owners. This is both a rarity in our industry and a testament to our continued performance in providing superior general construction services :while executing advanced customer satisfaction. Implementation Timeframe upon Receiving Notice to Proceed Once the prcject implementation phase begins with a no-.ice to proceed (NTP) from authorized city officials, ZCS can mcbilizeperscnnel and equipmentto begin the proposed work within 15 working days after receipt of the NTP. I 'i I () 'K it ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com ACORQ,, CERTIFICATE OF LIABILITY INSURANCE I(�DATE(Hn DD/YYYY) 1 11/15/2011 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED 3EPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, Certain policies may require an endorsement. A statement on this Certificate does not confer rights to the certificate holder in lieu of such ondorsoment(s). PRODUCER NAME: Naomi Perez Keen Battle Mead & Company PHONE FAX p y 1&9 No EMN 305.558.1101 (NC•Np).305.822.4722 7850 Northwest 146 Street E-MAIL --- - -_ - -- - - -- .ADDRESS_ Suite 200 PRODUCER ____- - - -- USTOMER ID N� Miami Lakes, FL 33016 C INSURER(S) AFFORDING COVERAGE NAICN INSURED INSURER A: Travelers Indemnity Company _ _ 09490 INSURER8: Travelers Property & Casualty 25674 2urqui Construction Service, Inc - 755 SW 40th Terrace INSURER C: Travelers Prop Cas Co of Amer 05590 Miami, FL 33165 INSURER D: Insurance Cc of Penna 19429 INSURER E INSURER F; COVERAGES r- raTirin ATC 1,11 Imnco. _ . • /or /.....o , THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH TFI IS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED I IEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. - -- INSR AODL SUER POLICY EFF POLICY EXP -_- - -- LTR TYPE OF INSURANCE INSR VJVD POLICY NUMBER MMID,I E% MM1D0/YVYY LIMITS GENERAL LIAOILITY DTC0345K96042ND1104 /10/2011104/10/2012 EACH OCCURRENCE IS 11000,000 X COMMERCIAL GENERAL LIABILITY d/ AGE TORENTED - S PREMISES Eaoccurrencet 300, 000 CLAIMS -MADE OCCUR ._ .- ?.1ED EXPIM (Any one person) S 5,000 A .. _. PERSONAL B AOV INJURY S 11000,000 GENERAL AGGREGATE S 2,000,000 !GEN -L AGGREGATEL11.1IT APPLIESPER: - -� I PRODUCTS - COMP/OP AGO .S 2,000,000 POLICY X PRO- JECT LOC -- -1 - I 5 AUTOMOBILE LIABILITY DT810345K9604COF1104/10/2011 0411012012 COMBINED SINGLE LIMIT __. X ANY AUTO S IEa acGtlenH _ '.,_ 11000,000 BODILY INJURY (Per person) $ _ ALL OWNED AUTOS S SCHEDULEDAUTOS BODILY INJURY (Per .—do.[) S - ...... __.. PROPERTY DAMAGE S X HIREDAUTOS (Per ecudem) X NON -OWNED AUTOS $ - -- X COMP DED $1,000 -- S UMBRELLA OCCUR DTSMCUP345K9604TIL11 04 /10/2011 04/10/2012 EACH OCCURRENCE S 1,000,000 C B EXCESS LIAB EXCESS CLAIMS -MADE! I AGGREGATE -- - S 11000,000 DEDUCTIBLE''. --_ _ _ S -- X RETENTION 5 10, 000j - -- S - - -�- WORKERS COMPENSATION I AND EMPLOYERS' LIABILITY 009774145 09!08/2011109/08 /2012 X We STATU- IOTH- TORY_LIl.71T5 ER D y / N ANY PROPRIETORIPARTNER/EXECUTIVE OFFICETMEMBER EXCLUDED? a N /A' ,I E.L. EACH ACCIDENT _ ___- _ IS 1,000,000 (Mend in NH) E.L. DISEASE - EA EMPLOYER S 11000,000 11 os6 d esu iDO under ! OE SC RIPTION OF OPERATIONS holov+ E.L. DISEASE - POLICY LIMIT j S 1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS/ VEHICLES (Allach ACORD 107. Additional Remarks Schedule, If more space Islroquirod) Project Name: Design and construction of Canopy Structures at Heritage Park and Golden Shores Park Project Number: RFP No. 11 -10 -01 CERTIFICATE HOLDER CANCELLATION ACORD 25 (2009/09) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. © 1988 -2009 AC( The ACORD name and logo are registered marks of ACORD TION. All ZU RQU I Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com ACORQ., AGENCY een Battle Mead & Com AGENCY CUSTOMER ID: LOC #: ADDITIONAL REMARKS SCHEDULE NAIEDINSURED Zurqui Construction Service, Inc ,LICY NUMBER Miami, FL 33165 CARRIER I NAIC CODE ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: ACORD Certificate O, Garage Liability INSR AOD'L LTR INSRO POLICYNUMBER ANYAUTO Automobile Liability NSR AOD'L LTR INSRD B X COLL DED $1,000 Excess /Umbrella Liability NSR AOD'L "i INSRD Other Liability INSR LTR POLICY NUMBER POLICY NUMBER POLICY NUMBER EFFECTIVE DATE: Page of POLICY EFFECTIVE POLICY EXPIRATION DATE(MM/DDIYY) DATE(MM1OD/YY) LIMITS AUTO ONLY - EA ACCIDENT S POLICY EFFECTIVE POLICY EXPIRATION DATE (MMIDDIYY) DATE (MIAIOD/YY) POLICY EFFECTIVE POLICY EXPIRATION DATE (MMIDDIYY) DATE (MM/DDNY) POLICY EFFECTIVE POLICY EXPIRATION DATE (MM1DOIYY) DATE (MMIDDIYY) © 2008 A( The ACORD name and logo are registered marks of ACORD OTHER THAN EA ACC S AUTO ONLY AGG S LIMITS 5 LIMITS CORPORATION. All I() 10 1 1 ZU RQU I Construction Services, Inc PHONE & FAX PROJECT MANAGER EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com 1 C:RIiA'iflhfER .. GREAT AMERICAN INSURANCE COMPANY INSUHA/tce GROUP O Fj 10 BID BOND Any singular reference to Contractor, Surely, Owner or other party shall be considerod plural where applicable. CONTRACTOR: SURETY: (Name, legal status and address) (Name, legal status and principal place of business): Zurqui Construction Service, Inc. Great American Insurance Company 9755 SW 40th Terrace 1060 Maitland Center Commons Blvd., Ste.i0o Miami, Fl, 33165 Maitland, FL 32751 OWNER: (Name, legal slates and address) City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 BOND AMOUNT: $ Five Percent of Amount Bid (* * *5%* * ) PROJECT: (Name, location or address, and Project number, it any) Design and Construction of canopy Structures at Heritage Park and Golden Shores Park. PROJECT CONTRACT NO.: RFP No. 11 -10 -01 The Contractor and Surely are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surely bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of [his Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a Surely admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof: or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirements shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this lath _ day of _November _ , 2011 / Zurqui t •trt r 'ion ce, Inc. – – (Seal) (Title) — - -- CI ?r1" ' A111� 2ICA� SURANCIs CONIPAIVY (Sur I (Soil) (Allorre ul - -acl) Michael A. Bonet (FL Resident- Agent) Tho Company exocuting this bond vouches that this document conforms to American Institute of Architects Document A310 - 2010 Edition ZURQUI Construction Services, Inc PHONE &FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com GREAT' AMERICAN INSURANCE COMPANY0 Administrative Office: 301 E 4TH STREET ® CINCINNATI, 01110 45202 ® 513 -369 -6000 0 FAX 513 - 723-.2740 The number of persons authorized by this power of attorney is not more than ONE No. 0 19968 POWER Ot: AT'I'ORNEV KNOW ALT, MEN Bl" 1'11ESE PRESENTS: "That the GREAT' AMfiRIC'AN INSUI2ANC'E COMPANY, a corporation organized and existing under and by virtue orate laws of the State of Ohio, does hereby nominate, constitute and appoint the person or persons named below, each individually Willow than one is named, its true and lawful attorney -in -fact, for it and in its name• place and stead to execute on behalf of the said Company, as surely, any and all bonds, undertakings Reid contracts of suretyship, or other written obligations in [lie nature thereof, provided that the liability of the said Company on any such bond, undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below. Name Address Limit of Power MICHAEL BONET OF MIAMI, FLORIDA $75,000.000. This Power ofAttomey revokes all previous powers Issued on behalf of the attorney(s)- in-fact named above. IN WITNESS WI II;RI :OF the GREAT AMERICAN INSURANCE C COMPANY has caused these presents to be signed and attested by its appropriate ollicers and its corporate seal hereunto affixed this 25TH day of JANUARY 2010 Attest CAWNI'AMERICAN INSURANCE COMPANY dtsitlnm Serrvrtl! 1 Dirisiaanl Seaiw Vice Pretu/ent S "FATE 01: 01110. COUNTY OF 11ANI I I ON - ss: DAVID c KITC111N (s77 "377.2405) On this 25TH day of JANUARY 2010 , before me perswVally appeared DAVID C. Kll'CIiIN, to me known, being duly sworn, deposes and says that he resides in Cincinnati. Ohio, that he is a Divisional Senior Vice Presider of the Bond Division or Great Annerican Insurance Company, the Company described in and which executed the above dnstrunient; that he knows the seal critic said ('onilmmy; that the seal anixcd to the said instnlmer is such corporate seal; dial it was so anixed by authority orhis onicc under the By -Laws ofsaid Company, and that lie signed his name thereto by like authority. KAREN L. GR OF O . r/ e - • NOTARY PUBLIC, STATE ATE Of OHIO i><1.RAi1'vl MY COMMISSION EXPIRES 02 -20.16 "I'his Pot, er ofAitorncy is granted by authority of the following resolutions adopted by the Board of Directors of Great American Insurance Company by unanimous written consent dated June 9. 2008. RESOLVI. . That the /Divisional President, the several INvisiona/ Selrior lice• /'residents. Divisional Out, Presidents cold /Jivisulia/ Assis•turli 1 ice Piesit/ents, or rein• one of then, he will hercbr is tnithol•i_ctt j'onr time• to tittle. to appoint one or more atorners -in- /•Tact to execute on behaljtif the C cnnpann"t: as snur(v. ally and till hondc, tau e' I(Ikings antd conno•uctc glsto."It /op. or other ivrilten ohl/gatians in the natloe thercq/; to pi- excribe their respective duties told the I-espec•live limits of their anithoritY. and to rnvoke anY such appointment (it on.t• time. RESO /. That the Cumptuw seal will the signet re of atq• q/ the nfiIresuitl o icers and ar {r seemigo•r or Asristanl Secretury q/ the Colnptcor nrar he (i ixed hrJilcsinrile to tars power ofutturnt.r or certi/icare q /either given fir the execution qfo nv bont tnndertaking. contract ofsurervship. or other tr7"iaen ohligulion in the ntanar themof, such slgnoli re and sea/ Irhe•n so used being he•reln• utlopteel by the C'uutpalry as the original signatiox, uJ "sitc•h officer and the original seal ofthe Contpwlr.v. to he va lid tart/ binding upo t the Conipcup• with the same• force turd e i ei us though manually "(fixed. [of x till III I III r"1141OW I, S'1'EPIIEN C. BERAI IA, Assislaw Secretary of Grcal Amcricaii Insurance Company, do hereby certify that the foregoing Power ol-Allonney and the Resolutions of the Board of Directors of June 9. 2008 have not been revoked and are now in full force and effect. Signed and scaled this / Q' clay of A1006M b ydv - 610 11 S1029AC (4/11) : b-sisrunr 5'rrr>:• <rr,7 I ZURQUI Construction Services, Inc Qualifications PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305 -221 6110 Eddy @zurquis.com With over22 years ofestablishedexperience, Zurqui Construction Services, inc. (ZCS) is a State certified general contractor that :vas incorporated in rAiami, Florida on August 25", ��989. ZCS has been spec- ificallyprovidingclesign ,ccnstructi0n, and installation of shade 'canopy structure services forover ?5 years. ZCS has been active) ;,r involved in the design, construction, and installation ofrecreational projects forboth public_ and private sectors since 20C4, and has grown into a reputable turnkey solution for many customers of shade /canopy structures. ZCS has been the premier prcviderof playgrounds, shade structures, and prefabricated sheitersformanidifferentcliet its to include: Miami Dade County's Park and Recreation Department, Florida international University, and the School Board of Broward Ccunty, just tc name a few. ZCS has completed several post and sail shade designs and installation projects in South Florida. We offer a highly trained and professional management team that has collectively and effectively worked together with knowledge and execution of our high quality C) standards. Our team will consist of internal personnel and carefully selected external professional associates: ith diverse backgroundsin the areasof engineering, arch itecture, and construction with the tenacity of contributing their collective and extensive knowledge to this project. By committing our man agementrescurces tc specificprojecfunctions,ZCSis capable of maximizing quality control to the completion of this project. Canopy Designerof Record Advanced ecreaticnal Concepts 3:25 Skyway Circle, Melbourne, FL32934 Tel.: -888- 957 -2355 Electrical Designer of Record Not Applicable Illustrated Evidence of Current Shade /Canopy Projects To authenticate currele van texperience ,qualifications and pas ,perfcrmance,ZCS wiIIvisibly exemplify in the follc:ving pages, three (3) en -going and recently completed shade, 'can opy projects. Finally, based on our described relevant experience, qualifications, and past performance, Zurqui Construction Services, nc.Will undoubtedlyclemonstrate to the city of Sunny Isles Beach that we are the best qualified firm to perform the Services described in the RFP solicitation. ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL + 305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com Zurqui Construction also has weekly and bi- weekly monitoring meetings in which submittals, RFi, and otherimportant project information are discussed.These as well as all meetings are documented and kept to date for a clear understanding. Canoov Desienerof Record Advanced Recreational Concepts 3125 Skyway Circle, Me I bo u m e, FL 32934 Tel. 1 -888- 957 -2355 Electrical Desiener of Record Not Applicable illustrated Evidence of Current Shade /Canopy Projects To authenticate our relevant experience, q u al if ication s and pastperformance,ZCSwilivisibly exemplify in the following pages, three (3) on -going and recently completed shade /canopy projects. Finally, based on our described relevant experience, qualifications, and past performance, Zurqui Construction Services,, Inc will undoubted lydemons +tratetothecityofSunny isles Beach that we are the best qualified firm to perform the services described in the RFP solicitation. III ZURQUI Construction Services, Inc State of Florida Corporation PHONE & FAX PROJECT MANAGER I EMAIL + 305- 221 -6100 Eddy Gonzales Jr +305 - 221 -6110 Eddy @zurquis.com State a f Florida Department of State I certify from the records of this office that ZURQUI CONSI'RUC'110N SL RVICL:, INC. is a corporation organized under (lie laws of the State of Florida, filed on August 25, 1989. The document number of this corporation is L 1 1415. I further certify that said corporation [IRS paid all fees due this office through December 31, 2011, that its most recent annual report was filed On JRDURry 5, 201 I, and its status is active, I further certify that said corporation has not filed Articles of Dissolution. ____.._..--- .._-_._------- __._.___._._._....__..._ V A115100021 pp STATE OF FLORIDA gg�II DEPARTMCON9TRURCTIONEINDUSTRYRLiCBNBINOLBREGULATION SNQb410081101738 , , f.ICBN86 .••" 08 17 2010 108007036 CGC053461 -' �I•`' "fl�i'l'�' The GENERAL CONTRACTOR P. Named below IS CERTIFIED ,11 Undor the provieione of OhapteY ji/�'F��. 1 Expiration date) AUG 31, 2012 1 I }•- ?. f I Ih l.' (� GONZALEZ EDDY JR ZURpUI CbNSTRUCTION SERVICES T}dE 9755 SW 40TH TERRACE(' ...!t,Ur)A'� •. MIAMI PL 33165 ('rirl gly't s', CHARLIE CRIST CHARLIE LIEN GOVERNOR DISPLAY AS REQUIRED BY LAW SECRETARY Act 4435659 STATE OF FLORIDA DEPARTMENT OF B�U1bbI1.�EJgS: AND V'ROFESSIONAL REGULATION CONeTRIICTION INDU9TRY,bICENSING BOARD ' $EQN L09060901830 LICENSE NDR Iwo /20091080520289 10BOO13845 The BUSINESS ORGANIZATION Named below I8 QUALIFIED Under the provisions of Chapter 489 FS. Expiration date. AUG 31, 2011 (THIS IS NOT A LICENSE TO PERFORM WORK. THIS ALLOWS COMPANY TO DO BUSINESS ONLY IF IT HAS A QUALIFIER.) ZUROUI CONSTRUCTION SERVICES INC 9755 9W 40 TER MIAMI FL 33165 L� CHARLIE CRIST CHARLES W. DRAGO GOVERNOR DISPLAY AS REQUIRED BY LA4V SECRETARY I ,j State of Florida General Contractor License State of Florida Business License Qhaw muter mp hand end the Cre a Sent r/ 111011rhb 1117 /he C/! rhh the ") Srnae /h d0 of 11 •114..•i., I Secretary of State 'd • Ainlendmduii IM 600191118956. 0)1711- 1.11.115 aryU WINS"' • I.nml Air <Nseri li<ae•.sisi116.•6dlnwiny sila. enur this IU. end elan 19111.11x• i1— Mh -dhP1I rd. h I l pa; / /efileswl blz.org/rcrbutl hrcr. h hn I ____.._..--- .._-_._------- __._.___._._._....__..._ V A115100021 pp STATE OF FLORIDA gg�II DEPARTMCON9TRURCTIONEINDUSTRYRLiCBNBINOLBREGULATION SNQb410081101738 , , f.ICBN86 .••" 08 17 2010 108007036 CGC053461 -' �I•`' "fl�i'l'�' The GENERAL CONTRACTOR P. Named below IS CERTIFIED ,11 Undor the provieione of OhapteY ji/�'F��. 1 Expiration date) AUG 31, 2012 1 I }•- ?. f I Ih l.' (� GONZALEZ EDDY JR ZURpUI CbNSTRUCTION SERVICES T}dE 9755 SW 40TH TERRACE(' ...!t,Ur)A'� •. MIAMI PL 33165 ('rirl gly't s', CHARLIE CRIST CHARLIE LIEN GOVERNOR DISPLAY AS REQUIRED BY LAW SECRETARY Act 4435659 STATE OF FLORIDA DEPARTMENT OF B�U1bbI1.�EJgS: AND V'ROFESSIONAL REGULATION CONeTRIICTION INDU9TRY,bICENSING BOARD ' $EQN L09060901830 LICENSE NDR Iwo /20091080520289 10BOO13845 The BUSINESS ORGANIZATION Named below I8 QUALIFIED Under the provisions of Chapter 489 FS. Expiration date. AUG 31, 2011 (THIS IS NOT A LICENSE TO PERFORM WORK. THIS ALLOWS COMPANY TO DO BUSINESS ONLY IF IT HAS A QUALIFIER.) ZUROUI CONSTRUCTION SERVICES INC 9755 9W 40 TER MIAMI FL 33165 L� CHARLIE CRIST CHARLES W. DRAGO GOVERNOR DISPLAY AS REQUIRED BY LA4V SECRETARY I ,j State of Florida General Contractor License State of Florida Business License ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com r CHANNEL DISTRICT PARK r Project Name: Channel District Park 12th Street & Washington Tampa, FL 33602 Contact: ' ' - Terry Rogers 1 n'. Southern Recreation (904) 387 -4390 w r W 1 �1. ZURQUI Construction services, Inc () 10 Iv PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com FORT WORTH ZOO SAIL CANOPY Project Name: Ft. Worth Zoo 1989 Colonial Parkway Fort Worth, TX 76110 Contact: Brandon Riggs Terra Pad, Inc - Playscapes (800) 364 -7732 ext. 215 x � z NO I I � m HP lift VAN w Y' o, gm••- � i f Oro' r City of Sunny Isles Beach RFP No. 11 -10 -01 Due Date 11/23/2011 @ 10:00AM I() ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com Windley Key ® Islamorada, FL Description: This project was constructed on a historical lime rock quarry. Zurqui constructed a two story learning center building which included a kitchen facility to accommodate all students. The work consisted of site work, concrete work, 0 drywall & painting. I '-) Owner: Fl. Dept, of Environmental Protection Design & Recreation Services 3900 Commonwealth Blvd. Tallahassee, FL 32399 (305) 488 -2455 Architect: Fl. Dept. of Environmental Protection Debbie Prebble 3900 Commonwealth Blvcl. Tallahassee, FL 32399 (850) 488 -2455 Size: 3,400 sq ft Cost: Original $ 600,000.00 Final $ 600,000.00 Completion Date: 11/30/1999 Project Type: New Construction Service Provided: oCM @ Risk oProject Management cNalue Engineering Xonstructability Key Personnel: z'Eddy Gonzalez Jr. Eva Dotres uJulio Perez ZURQUI Construction Services, Inc Ryder Business Building Florida International University Miami, FL Description: Removal and replacement of glass blocks and installation of new steel columns to enhance fagade and upgrade aesthetics while maintaining building use and occupancy. After the exterior glass block was installed, portions of the exterior of the buildin- received new stucco and paint. This project was completed during the school year so extra measures were taken to protect the students and faculty which were using the the facility and the adjacent areas of the campus. PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com Owner: Florida International University Martha Torres University Park CSC 249 Miami, FL 33199 (305) 348- 4077 Architect: _Corzo, Castella, Carba_ llo, & Thompson ( C3TS) Albert La Torre 901 Ponce de Leon Blvd. Coral Gables, FL 33134 (305) 445- 2900 Size: Exterior Building Facade Cost: Original $ 178,798.00 Final $ 175,997.00 Completion Date: 12/22/2003 Project Type: Remodeling Service Provided: oCM 0 Risk oProject Management oValue Engineering oConstructability Key Personnel: .Eddy Gonzalez Jr. .Fernando Yepes olsrael Mendoza 111) 10 ZURQUI Construction Services, Inc Treasure Island Elementary Miami, FL PHONE & FAX PROJECT MANAGER I EMAIL + 305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com Owner: Miami Dade County Public Schools Albert Poza (305) 995 -4859 1450 NE 2nd Ave Suite 318 Miami, FL 33132 Architect: Architeknics Lourdes Rodriguez (305) 661 -5392 7450 SW 48 Street Miami, FL 33155 Size: 2,800 sq ft WE Cost: Original $ 176,500.00 Final $ 167,126.55 Description: Constructed a new prefabricated PE shelter and Completion Date: 10/28/2003 0 storage with a covered walkway for the use of the faculty. Project Type: New construction This was the first job executed by Zurqui for the Service Provided: Miami -Dade County Public Schools. This project oCM @ Risk enhanced the experience needed in procedures with oProject Management the school board. Zurqui understands the oValue Engineering ® importance of the safety and intensity of the student Xonstructability community in regards to the supervision and management of the work site at all times. Key Personnel: .Eddy Gonzalez Jr. ziFernando Yepes oCarolina Castrillon C) WE ZURQUI Construction Services, Inc Project Information PHONE & FAX PROJECT MANAGER I EMAIL + 305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com Zurqui Construction Services, Inc. tentatively proposes -he folIo:•.ringschedUleand work pIan timeline to Successful Iyccmpletetheser� ices requestedin this solicitation upon receiving formal Notice to Proceed (NTP). *Prciec: Timeline: Contrac and Bond Procurement Notice to Proceed (NTP) architectural and Engineering Design Permit Process Construction Heritage Park Construction Golden Shores Park 3 %�eeks _'Reek 5:'veeks 4 10.,'e e k s 4 Months 3 M c n :h s Projec- Closecu :,'Substantial Completion Mon-1h *Nate: A:, previously describad in Section 4 j_:,pproachimethodoloWi, asthe project evolves from Fhases S through 5, possible modfi atic, ns in design and coistrrttionipermutual agreement }, may affect the p0 posed tirnelina Amore defined and solidified ti me Iine•can be rnutuafly agreed upon during contract negotiations. I \ ZURQUI Construction Services, Inc Pre - Construction Sol-vices PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305 -221 -6110 Eddy @zurquis.com ZUR UI ORGANIZATIONAL CHART zttranl Constt•uction Services, Inc. Constt•uction Services Marketing Estimating Project Outreach Design Management Pre- Review Scheduling Qualifications Value Daily Business Engineering Operations Development Constm ctabilily Sub Systems Coordination fingincering Project Closeout Project Manuals Warranty Services 1 j I Office Management Site Administration Hunan Accounting OSIIA Resout•ces Finance Control Control Insurance Insurance Cost Control Legal Issues Payable Security Receivable Systems Project Contract Com•dination Administration Contract Communication Insurance Purchasing Compliance Change Orders Emig ZURQUI Construction Services, Inc Kaushik Padala Pre - Construction Sr. Estimator Years with Firm: 2 LF -.ED AP Eddy Gonzalez, Jr. President Years with Firm: 22 BA in Construction Management Carolina Castrillon Construction Services Sr. Project Manager Years with Firm: 7 Architect, LEED AP PHONE & FAX + 305- 221 -6100 + 305 -221 -6110 Vicente Lago Project Executive Years with Firm: 3 MA in Construction Mgmt. LEED AP P /tOJECT CON7AC'T ON SITE STAFF Rodger Reyes Project Manager Years with Firm: I BA in Construction Mgmt. PROJECT MANAGER I EMAIL Eddy Gonzales Jr Eddy @zurquis.com Marilyn Noya Executive Assistant to President / Office Manager Years with Firm: I Jorge Trujillo Eddy Gonzalez, Sr. Javier Gonzalez Superintendent Quality Control / Foreman Years with Firm: 2 OSHA Years with Firm: 20 BA in Business Admn. Years with Firm: 22 1 OSHA / AHCA Certified E Ic ZURQUI Construction Services, Inc President Education: BS Degree in Construction Management, 1988 Florida International University PHONE & FAX PROJECT MANAGER I EMAIL + 305- 221 -6100 Eddy Gonzales Jr + 305 -221 -6110 Eddy @zurquis.com Construction Yeai•s: Over 25 years experience in the construction industry. 22 years with Zurqui Construction Service, Inc. License: General Contractors License of the State of Florida, 1991 (CGC # 053461) Mr. Gonzalez has over 25 years of construction experience in South Florida, starting as a carpenter helper and working on both the field and education, to become the founder of Zurqui Construction Services, Inc. in 1989. Mr. Gonzalez combines his skills and knowledge to oversee the projects for compliance and ensures that resources are available to perform the project on time and within budget. Eddy Gonzalez, Jr. through is vision and determination took the company from being a small subcontractor to a multi- faceted construction company. Mr. Gonzalez's dynamic leadership skills have allowed him to constantly revitalize the company, providing growth under his direction. As a result, of his vast knowledge and experiences lie is able to lead his team of qualified individuals to success. It is Mr. Gonzalez's emphasis on communication and team work that foster and nurture an environment of quality and innovation. His involvement in overseeing all projects has led him to gain a tremendous amount of experience in both construction and management. His major responsibility is ensuring cooperation amongst the Q three departments of the company so that they work collectively toward goals. His expertise in both construction management art risk projects and office management are an asset to Ztu•qui Construction Services, Inc., as well as all construction projects. Construction Management (CM) At -Risk Educational Project Experience: • Allapattah Middle School, 15,000 square feet, $2,063,443.00 O • Perrine Elementary School, 15,000 square feet, $5,142,047.00 • Howard Drive Elementary School, 12,000 square feet, $3,732,589.00 • Bahia Honda State Park Restroorn, ADA Renovation, 2500 SF, Florida Keys • Bahia Honda State Park, Disaster Renovation, Varying SF, Florida Keys • Curry Hammocks Facility Renovation, 1400 SF, Marathon, Florida • Windley Key State Park, 3400 SF, Islamorada, Florida • Pines Baptist Temple, 8000 SF, Pembroke Pines, Florida • Family Golf Center, 12 acre Site work Improvements, CB Smith Park, Pembroke Pines, Florida • Coral Gables Hospital, 2000 SF, Renovation of Intensive Care Unit, Coral Gables, Florida U U ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305 -221 -6110 Eddy @zurquis.com • Holy Cross Academy, 6000 SF, Kitchen Conference Room, Miami, Florida • Hialeah Senior High School, Technology Upgrades and Classroom conversions, $256,913.00 • Carol Middle School, Technology Upgrades and Classroom Conversions, $133,599.00 • Henry Filer Elementary, Technology Upgrades and Classroom Conversions, $145,885.00 • Amelia Earhart Elementary School, Technology Upgrades, $375,032.00 • Parkway Elementary, Technology Upgrades and Classroom Conversions, $132,885.00 • Hialeah Senior High, ADA Compliance Upgrades, $313,622.00 • John F. Kennedy Middle School, QZAB Renovations for Labs, $273,836.00 • Carol City Senior High, Electrical and Mechanical Upgrades, $414,602.00 • Miami Southridge Senior, Running Track on County Park, $1,190,007.00 • Natural Bridge Elementary, ADA Compliance Upgrades, $239,324.00 • Parkway Middle School, ADA Compliance Upgrades, $289,417.00 • M.A.S.T. Academy, Handicap Access Route & Parking, $201,547.00 • Miami Edison Senior High, ADA Bathroom Upgrades / Renovations, $990,000.00 • Jane Roberts K -8, Child Drop Off, Parking Lot and Canopy, $890,000.00 • Camp Owaissa, Renovation and Upgrade of Existing Cabins and Facilities, $1,200,000.00 • Aventura Waterways, Child Drop Off and Canopy, $250,000.00 (Under Consb•uction) Additional CM q.) Risk Educational Facility Experience: • VH Building Renovation, FIU, Continue General Contract, CM @ Risk • Engineering Building, FIU, Continue General Contract, CM @ Risk • BA Building, FIU, General Contract, CM @ Risk • Kinloch Park, CM @ Risk • Treasure Island Elementary, CM at risk • Health & Wellness Center, FIU, General Contract, CM @ Risk • DM Building, FIU, Continue General Contract, CM @ Risk • Auxiliary Bathroom, FIU, Continue General Contract, CM @ Risk • Vice President's Office, FIU, Continue General Contract, CM @ Risk • Financial Aid Office, FIU, Continue General Contract, CM @ Risk • ECS 328, FIU, Continue General Contract, CM @ Risk • Asphalt Walkway, FIU, Continue General Contract, CM @ Risk • ECS 352, FIU, Continue General Contract, CM @ Risk • Loop Berm Reduction, FIU, Continue General Contract, CM @ Risk • Underground Cabling, FIU, C011t1nUe General Contract, CM @ Risk • President's House and Events Center, FIU, General Contract, CM @ Risk • Nova Middle School, BCPS, Classroom Addition and Restroom Renovation, $5,000,000.00 Currently Active CM a� Risk Contracts in Miami Dade County: • Misc. CM @ Risk Contract for Miami Dade County Public Schools • Misc. CM @ Risk Continuing Contract for Florida International University • Misc. CM @ Risk Contract with Miami Parking Authority 2009-2011 • Misc. CM @ Risk Contract with the City of Hialeah Gardens 2008-2011 • Misc. CM @ Risk Contract with the Town of Cutler Bay 2011 ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL + 305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com Project Executive Business Development / Prc Const►-uction Services / Closeouts L.EED AP Education: BS Degree in Finance, 2004 Florida International University BS Degree in International Business, 2004 Florida International University MS Degree in Construction Management, 2011 Florida International University Construction Years: Over 12 years experience in the construction industry. Mr. Vicente Lago is responsible for directing, establishing, maintaining, and planning the overall policies and goals for our business development department. Mr. L.ago identifies potential business partners and negotiates agreements. In addition, he coordinates with all departments in the company and oversees that they are following scliedules and that all required documents are submitted as per the contract. Iie will serve as your liaison for job proposal, follow -ups, close -outs and any other needs you may have and he will continue contact with the Owner once the project proceeds fi-om Pre - construction to the Construction portion of the project. Fie leas a combined 11 years of experience in design, construction, construction management and marketing and has the versatility to effortlessly transition in order to satisfy the needs of each individual client. Over the past 2 Years, Vicente Lago has closed 18 Projects at Miami -Dade County Public Schools (MDCPS) and is currently on pace to close the remaining 4 open Construction Management At -Risk Projects that remain open. Mr. Lago has extensive experience in regards to the Closeout Process at MDCPS and has been working diligently with Project Managers to achieve this required Goal. Closeout Services Currently Being Provided for Miami -Dade County Public Schools: • Coordination of pre - construction documentation and subcontractor pricing. • Coordination of Pre - qualification of Sub Contractors for each project, to make sure that all the contract requirements are met. • Review Minority Requirements and assemble a team to make sure that the contract documents requirements are met in regards to the involvement of African American and Women Owned Firms. • Preparation and qualification of Design Build Teams and Presentation packages. • Coordination, accumulation and submission of all required insurances, bonds and certifications during the prc- construction phase of the project. • Update and maintain company certifications, minority certifications and vendor applications. • Detailed review of all construction documents and provide team with Construction ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 EddyGonzalesh +305- 221 -6110 Eddy @zurquis.com recommendations. • Provide MDCPS with the required Design Review, Constructability and Value Engineering Reviews prior to the Submission of any price proposal. Provide MDCPS with Options that will offer cost and time savings while not compromising the quality of the project. • Submission of all the required GMP Negotiation Documentation prior to finalziton of the project GMP Agreement. • Maintain constant contact with ZCS Field staff throughout the life of the project to ensure that all the required closeout items are being collected prior to end of the project. • Provide detailed schedules and cost estimates at each design phase to the Architect and MDCPS. • Service existing projects that are in the Closeout Process in an effort to finalize any outstanding documents or inspections required to close the project. • Coordinate with the Architect so that all the required as- builts, warranties, manuals and miscellaneous closeout items are submitted to MDCPS. • Follow up and coordinate any required work that is still pending so that all Summary Violations are finalized and that the project continues moving forward with the Closeout Process. • Coordinate weekly Closeout meetings with MDCPS staff so that all required Closeout issues are being addressed. • Insure the Safety of all Students and Teachers using the Facility that is in the Closeout Process. • Coordination of Inspections with MDCPS staff, Subcontractors, Inspectors and MDCPS Consultants (A /E). • Insure that all Bonds and Insurances are up to date on all projects, even during the Closeout Phase. Current MDCPS CM c -, Risk Pre - Construction Services Experience: • Aventura Waterways, MDCPS CM @ Risk Miscellaneous Contract Ern retTtly trader conslrrrclion, Parent Drop Off and Consh•trc•lion of Covered 141'alk►i,a}, Ackli /ion / C'a1701,)y Protect • Bent Tree Elementary, MDCPS CM @Risk Miscellaneous Contact Conswuclion is Scheduled to Commence in August 2011, ADA Comldiance Renovation of Existing Bathrooms • Ferguson Senior High School, MDCPS CM Risk Miscellaneous Contract CotTstt•trction is Scheduled to Commence in August 2011, Cons /ruction ol• Passenger Evil Dl'iVe1VC!), f0t' the Existing RtorllT Parent Drop Off and the Xloclil<cation of Existing .South Parking Lot to include an Additional Parent Drop Off Area. • Ben Sheppard Elementary School, MDCPS CM to Risk Miscellaneous Contract CotTstt•trction is Scheduled to Commence in December 2011, ADA C'omp7liance Renovalion of Exisling Bathrooms, JVater Fountains, Parking Spaces, Door HaT•cha,are, Signage and Visual Displays. • Coral Park Elementaiy School, MDCPS CM a Risk Miscellaneous Contact CorTslr•uction is Scheclrrled to Commence in September 2011, ADA Coml.21iance Renovation and Construe /ion ofAdclitional Parking Lot to A,leet Cw-renl Cock, Requirements. f() ZURQUI 6 Construction Services, Inc t :; # t i Pre - Construction / Sr. Project Manage, LEED AP Underground Utility License General Contractoit•s License Education: BS Degree in Architecture, 2005 Florida International University PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com Construction Years: Over 12 years experience in the construction industry. Ms. Castrillon's primary area of experience has been in educational & miscellaneous CM @ Risk projects. Ms. Castrillon has supervised and directed field and office staff, which includes preparing, reviewing and administering contract documents, job planning, and value engineering. Ms. Castrillon has developed and controlled job budgets and schedules. Ms. Castrillon currently handles all the pre - construction and a portion of the closeout services for all the jobs in our portfolio. Her education as an Architect and a LEED AP provides an invaluable service to not only our firm but all the clients that we represent. Pre- Construction Services Experience for CM t� Risk Projects: • Howard Drive Elementary (Fast Tracked) Ne , 10 classroom building / 12,000 square fee! • Perrine Elementary (Fast Tracked) Net;, 10 classroom building, PG Sheller, playground and playi,elcis / 15,000 square fire! • Amelia Earhart Elementary, Miami, FL C,LI @ Risk QZAB renovcrlion • Carol City Middle, Miami, FL QZAB Renovalion/lechnology upg,•ade • Hialeah Senior School, Miami, Florida QZfi B ►•e,7o►,al ion/ Iechnolog), upgrade • Horace Mann Middle, Miami, Florida QZAB renovation/ fech,aology upgrade L) • FIU Arts Studio Neu, Consl,•rrclion gfflrl Studio • Miami Edison Senior High School CXI @ Risk ADA Balhroom Upgrades / Renomitions• • Jane Roberts K -8 C,111 @ Risk Child Drop QfJ Parking Lot Canslruclion and Canopy CM q, Risk Projects Construction Management Experie>ce: • Hialeah Middle School, Miami , Florida CA,1@ Risk/ technology upgrade • Lake Stevens Middle, Miami, Florida ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com CjLI@ Risk / technology upgrade • John F. Kennedy Middle, Miami, FL Cl'Vl@ Risk / technology upgracle • South Hialeah Elementary, Miami, FL Poi-table clemolilion • Natural Bridge Elementary, Miami, FL Ci1'1@ Risk /ADA Renovation • Parkway Middle, Miami, FL Cwl@ Risk /ADA Renovation • Stoneman Douglas High/Miramar High School CA11 @Risk /ADA Renovation 29 Resn•ooms • I-Iaulover Marina Dockmasters Complex New recreational builcling (2010 ABC Construction Project of the Year) • Perrine Elemental, Cdl @Risk / Netil, consiruclion • Camp Owaissa Rehabililalion, Renovation and Upgrades vf'Existing Cabins and Community Center • John F. Kennedy Middle School CjW @ Risk QZAB Renovalions.for Classroom Laboratories • M.A.S.T. Academy CJIl @ Risk Ilandicclp Access Rollie and Pal'king.Sjxice Col ?strilction • Miami Southridge Senior High School CAW1 @ Risk Running Ti•ack Facility on County Park • Lake Stevens Middle School CjIYI @ Risk Technology Upgrades and Classroom Conversions Additional Experience Available Upon Request. FE W ZURQUI Construction Services, Inc ANI,I1[1rei� Senior Project Manager Education: Florida International University BA in Construction Management PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr + 305- 221 -6110 Eddy @zurquis.com Certifications: LEED Accredited Professional Post- tensioning Institute Level I field fundamentals for un- bonded post - tensioning OSHA 30 hour Construction Safety & Health Construction Years: 13 years experience in the construction industry EXPERIENCE: 0 Lennar Homes SE, Miami FL, 2004 -2009 • Managed the turnover of the facilities of the 360 & Colonnade Condominiums from the developer to the Home Owner Associations • Assisted in the due diligence stage for the purchase of a 527 unit 43 acre partially completed condominium project in Doral, FL. Continued with the subcontractor buy out and O management of construction activities of the project as a project manager /superintendent Lennar Developers, Inc. Miami, FL, 2004 -2008 • 360 condominiums — 100 million dollar, 2 phase project, 414 luxury units condominium and marina • Colonnade Condominiums — 100 million dollar, 4 phase project, 570 unit condominium Turner Construction Company, Miami, FL, 2000 -2004 • Mutiny Park — 53 million dollar 23 story hotel /condo. Superintendent /project engineer for high end event rooms, commercial kitchen, and pool deck. Responsible for submittals and shop drawings for area as well as MEP coordination and start -ups. • La Perla — Project Engineer for the pre- construction on a 42 story condominium. Wrote (J scopes for the demolition phase and the erection of the building. Handled all submittals, change orders, and pay applications. • Sonesta Hotel — 1 million dollar interior build out. Requested by owner. Project Manager /Superintendent for entire project. • Courtyard Marriott — 10 million dollar 5 story hotel. Superintendent for the exterior and MEP coordinator for the interior. Handled all exterior submittals and shop drawings. • Fire safety upgrades for Miami Dade Public Schools. Superintendent for retrolit of fire alarm, fire sprinklers, and smoke evacuation. • Circuit City — 3.3 million dollar interior renovation. A 3 phase renovation that occurred while store was in operation Superintendent for all daytime work. U ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr 1 305- 221 -6110 Eddy @zurquis.com Project Manager Education: AA in Architecture Miami Dade College Certified Florida Department of Environmental Protection Stormwater Erosion and Sedimentation Control Inspector OSHA 30 Hour Construction Safety Certified Construction Years: 23 years in the construction industry. Construction Qualifications: As Project Manager, Roger Reyes has over 23 years of extensive Construction Management At -Risk experience having worked on new construction or renovations of Educational Facilities throughout the State of Florida. Mr. Reyes provides Complete Project Administration with experience ir managing construction sites with an excess of 200 + on site workers. Mr. Roger Reyes has had extensive experience in the Constrriction Management At -Risk field, especially for Miami -Dade County Public Schools (MDCPS) were lie was responsible for the construction or renovation of over: a dozen schools during his time as Project Manager for Pirtle Construction. Construction Management (CM) At -Risk & Additional Educational Project Experience: • Miami Central Senior High School Demolition and Existing Campus Replacement / Nell, Consn•rrclion (3 Phases) S43,795,833. 00 • Rockway Middle School New Constrtrclion of an Educalional Facilily, S18, 000, 000.00 • South Miami K -8 School New Consth•uclion gfan Educational Facility, 520,000,000.00 • Sunset Senior High School New Science Thing and Inferior Renovations, S3,450, 000. 00 • Norwood Elementary School Afe1,v flddilion and Renovation of Exisling Bathroom and Classr-ooms, S3, 100, 000.00 • Miami Palmetto Senior High School New Addition and Renovation gfExisling Facilities, S4,540, 000. 00 • South Dade Senior High School Renovation qfE isling Facilities, 5;/,000,000.00 • Ojus Elementary School Addition and Renovation of Exisling Facilities, 5-1,-150,000.00 • Caribbean Elementary School it'Iodidar Conslruclion Program, jWDCPS Projecl No. 00139200, S1,899,3 71. 00 • Claude Pepper Elementary School Allodular Construction Program, AIDCPS Project No. A01109, S1,927,881. 00 0 I () ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com e Kendale Lakes Elementary School A,Iodular Construction Program, 11MCPS Project Alo. 00139400, 51, 976,919. 00 ® Pine Villa Elementary School jlllodular Construction Program, AlIDCPS Projec! 1Vo. 00139500, S2,905,449. 00 • Zora Neale Elementary School A /lodular Construction Program, MDCPS Project iVo. 00138400, 51,837,467 • Bob Graham Educational Facility iVew Construcliorr orarr flddilion to an Existing School, S5,800, 000.00 (Crurenl& Under Construction) Additional Experience Available Upon Request, ZU `Q" I PHONE & FAX Construction Services, Inc + 305 - 221 -6100 + 305- 221 -6110 A 11 .3 ".,4 1 ... .ti .1 I k Project Coordinator Education: Candidate of Business Management Brooklyn College, Brooklyn, NY ACad Design Certificate NY University, New York, NY PROJECT MANAGER I EMAIL Eddy Gonzales Jr Eddy@zurquis.com Construction Years: Over 18 years experience in the construction industry. Computer Skills & Qualifications: PowerPoint, Excel, MS Word, Quickbooks, Outlook, Prolog, Project Tracker 3, Permit Pro, Set Space, Share Point and Keyboarding 65 wpm. Knowledge of blueprints, plotter operations, AC: Design Program, take offs, submittals, contract negotiations, change orders, purchase orders, clo out documents, requisitions and certified payroll. Construction Experience: Ms. Giannari's primary expertise has been in contract management /administration, change order purchase orders and collecting all necessary documentation from Subcontractors in order to comp with contract specifications. She started out in the construction industry over 18 years ago and sl gained her main experience from her own general contracting company. She moved into anoth part of the construction industry, the permitting aspect of it which gave her a clear understanding codes and compliance with County and /or State requirements. Ms. Giannari currently handles all pre - construction services such as temporary power, tempora facilities and mobilization facilities as well as submittals, close -out documents, contract negotiation contract management /administration and purchasing for all our projects. On -Going Projects: ■ Newberg Apartments (Currently On- going) ■ Sunny Isles Fire Station 810 (Currently On- going) ■ Barket Office (Currently On- going) ■ Everglades Re -Entry Center (Currently On- going) ■ MDT Bus Shelters (Currently On- going) Close -Out Documents: ■ International Uniforms (Close Out Documents Stage) ■ ITS Annex Warehouse (Close Out Documents Stage) ■ Miami Circle (Close Out Documents Stage) ■ Felix Varela — Baseball Netting Project ■ ICON Brickell — Sidewalk Replacement Pre - Construction Services: ■ Aventura Waterways K -8 Center Canopy ZURQUI Construction Services, Inc a Westview Middle School — Fire Suppression Work 0 Bob Graham — New Construction Interior Renovation: HUD Residential Renovation — 8 Family Building 49 East 50th Street, Brooklyn, NY NYC Housing Authority, $580,000 PHONE & FAX PROJECT MANAGER I EMAIL + 305- 221 -6100 Eddy Gonzales Jr +305 -221 -6110 Eddy @zurquis.com HUD Residential Renovation — 20 Family Building 555 Blake Avenue, Brooklyn, NY Housing and Preservation Development (HPD), $750,000 Chelsea High School — Kitchen Renovation New York, NY NYC School Board. $38,000 Additional Experience Available Upon Request. ZURQUI Construction Services, Inc Quality Assurance Manager Safety Director Education: University of Commerce, Cuba, 1960 PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com Construction Years: Over 42 years experience in the construction industry. 21 years with Zurqui Construction Service, Inc. /-J Mr. Eddy Gonzalez Sr. has 42 years of experience in the construction industry. Mr. Gonzalez's responsibilities include complying with life safety and enforcement of company policies for all field manpower. In addition, he is responsible for constructability reviews and reassuring quality throughout all phases of construction. Mr. Gonzalez's years of construction experience are an incredible asset to our firm due to the fact that his knowledge of construction and of the building code provides us with the ability to meet our client's most precise needs. Due to Mr. Gonzalez's vigilance in regards to quality control and safety, Zurqui Construction Service, Inc. can proudly highlight that we have had no Workers Compensation or General Liability Insurance claims since 2003. This is a clear indication that OUr mandatory OSHA certification training for all field staff and our weekly tool box meetings are reinforcing to all individuals working at the jobsites the importance of putting safety first. Construction Experience: • Perrine Elementary School, 15,000 square feet • Howard Drive Elementary School, 12,000 square feet • Health and Wellness Center, 12,600 square feet • Allapattah Middle School, 15,000 square feet • President's House $ Events, 13,000 square feet • Amelia Earhart Elementary, 1,500 square feet • Feinberg Fisher Elementary, 2,000 square feet • Country Club of Miami, 138 acres • Villa Godoy Condominium, 65,000 square feet • Country Club of Miami Driving Range, 27,000 square feet • Kendall Soccer Park, 2,825 square feet • African Heritage Cultural Arts Center, 8,000 square feet • Westwind lakes Park, 6,800 square feet • Martin Luther King Jr., Memorial Park, 6,000 square feet • Holiday Park Phase III, 23 Acres South Florida Hospital, 250,000 square feet Additional Experience Available Upon Request ZURQUI Construction Services, Inc PHONE &FAX PROJECT MANAGER I EMAIL + 305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com Approach /Methodology Zurqui Construction Services, 'nc, proposes the following approach methodology to successfully complete the services requested in this solicitation. Phase 1: Due Diligence Review / Conceptual Submittal We propose to obtain and revie ,( existingA s -Built plan s.Reviewexistingprcject plans and visit existing facilities. Review and coordina teas- builtand existingplans to identifylimitations, conflicts, possibilities available to inform revised documents. Perform comprehensive Quality Control Reviews, and re- emphasize project objectives, needs, and program requirements, if needed. Perform comprehensive code compliance reviews of the following: Florida Building Code dates: edition) ADA Accessibility Code (latest edition 0 National Fire Protection Code (latest edition) National Electrical Code (latest edition) Phase 2: Owner Review and Coordination O nerReview and Coordination with Design Team K' /E, and 5C4c Submittal of As -3uil: plans. Condur. K%, and 501* review and coordination meeting upon completion of revised plans and specifications. incorporate comments into plans and specifications prior to Building Department submittal. Phase 3: 04;rner Review and Coordination (Continued) O. -.mer Revievr and Coordination . -.,i-.h Design Build Team of 909 Submittal. Concluct9C /i review and coordination meetingupon completion of revised plans and specifications. incorporate comments into plans and specifications prior to Building Oepar :ment submittal. Phase 4: Permit Review Submittal Commence Building Depar :mentsubmittal documentation forpermit review and issuance. incorporate comments into plans and specifications., if necessary. Phase 5: Construction and Completion Support Services Upon Notification to Proceed, the Contractor will submit an initial project Schedule, and an initial Construction Schedule. Review, comment, and recommend these schedules alv.,ays looking -,o ensure project goals and objectives are accounted for within these quantifiable, measured schedules. Periodically review progress of the Workte ascertain qualitycempliance : vith contract requiremen ,s and construction clocuments.When the workis deemedready, establish the date of SubstantialCcmple ion, and prepare a project completion notice. When the :cork is deemed completed, establish the clate of Final Completion. Provide Warranty Support information services during contract warranty, period. ZURQUI Construction Services, Inc Price Proposal PROJECT MANAGER I EMAIL Zurqui Construction Services, Inc, offers the following proposal fcrthe clesign, permitting, fabrication, and installation of canopy structures to be located at thefoIlo vingparks over the existingnon- covered playground areas: Heritage Park Stage 19200 Collins :avenue Golden Shores Park 191Terr. and Atlantic Blvd ZCS will provide all labor,material, equipment, coorclination, supervision, designs, and any other service necessary to provide a 1004/c approved tum -key project as it relates to the design, fabrication, and installation of canopy structure attheHeritage Park playgro Lin cl and the Golden Shores Park playground. (Per specification given within the RFP) ZCS will provide /obtain all necessary signed and sealed clocumentation, signed and sealed drawings, conceptdra,ings, schematics, calculations, permisting CIO Cum entation , permit applicationsandpermits from all AH1's, and information necessary tcdesign,ccnstruc., fabricate, and install the intended canopy structures and leave the site in good condition acceptable to the City. Total CostforLabor and Materials for Heritage Park Shade /Canopy Structure: $268,000.00 lump Sum: $381,500.00 M Ilk i r d � g° _ [ �.. ?' LAKE EVA PLAYGROUNDS Project Lake Eva Playgrounds Orlando, FL ;... - Contact: of GINO 1 t; City of Sunny Isles Beach RFP No. 11 -10 -01 Due Date 11/23/2011 @ 10:00AM ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy@zurquis.com I i-' ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL + 305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com ZURQUI Construction Services, Inc SENATOR JAVIER SOUTO C OM MIS SIOI -JI. R AugUsl 5, 2010 PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com .' %dc «a�l� Z�u��rl� �C�ai�r»7�iVi��rcre MIAMI -DADS COUNTY — FLORIDA DISTRICT 10 111 1.1 W FIRS1 STREE I. SUITE 320 MIAMI FLORIDA 331 28 1963 13051 3754835 FAX 13051 3754838 Fo Whom h May Concern: It is with great pleasure that I write this letter ol'recObnition On behalf'Of Zurqui Construction Scrvicc. Inc. and their staf, fill. the coils( rtletioll of, the I-laulover N4111-irla Dockniaster Complcx. As Chairman of'Ihc Recreation. Culture and'Fourisnl C'omnliltce, I take great pride in the fuel that the I- laulovcr Mau•ina Dockmaster Complex is this year's recipient of the National \,farina Day (NIAD) and Marina ol'the Year Award by -['lie Association of' Marina Industries (AMT). On .lone 1 211i 2010. Nliami -Dade Park and Recreation Department celebrated National Marina Day al the two-story. 7.300 square foot (lock mastcr building and also the dedication ol,the falcilit), as the Bill Bird \,farina at I -lmd( wer P.irk. The docknTasler building waS built in the Miami Modernc (MIN ,fO) architectural design style and features design elements found on ships .111(1 (lie maritime industry. I .would like to thank Zurqui Construction Scrvicc, Inc. fill. your duc diligence, expert guidance and continued support throughout the construction of this Award Winning Facility. I look fin-ward to working with your company on future Miami -Dade County Projects. , / �t 7Sincelcly, / - �Aw Scn..lavic wto Miami Dade County Connrlissioner District 10 Chairman, Recreation, Culture and Tourism Committee DISTRICT OFFICE • 9766 S 24 STREET • SUITE I • MIAMI. FLORIDA 33165.7575 • J3051 2222116 • FAX 13051 222 -2120 ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzalesir +305- 221 -6110 Eddy @zurquis.com Tl -1h, SCUIOOL HOARD OF 13ROWARD COUNTY, FLORIDA October 7, 2009 To Whom It May Concern, I am pleased to write this letter of reference for Mr. Eduardo R. Moreno, Supervisor, Zurqui Construction Services, Inc. A seventeen- classroom addition was built at Nova Middle School and Zurqui Construction won the bid. Before and during the facilities project, Mr. Moreno was on site almost daily, making sure that all facets of the venture ran smoothly and that employees were on task. Now that the project is almost complete, Mr. Moreno still visits the site to ensure that all items are up to par. He is very dedicated to his profession and I highly endorse him in any capacity. C.3 Should you have any questions or concerns, please contact me at 754.323.3709. Sincere Dr. R and Ga cia, Principal RG /rl Truns/nrrrlulg hdu"nNnlr. Chu• .Snlr /en/ of :1 Tim" /iruu urd C'ou//r) /'r.h/ir .Sdn/n / \' la . I n h.i /rrrr/ Op/an•timit}• Lgnu/ : le(- sc h.nlplu� "r I \Ut.\ .MIDDLl•:SC 11001' Ricardo (Garcia. Ld. D.. Principal SCHOOL IiOARU 3602 Coil ,\acaue Davie. F133314 (7i.1) 323.3700 Phone (754) 323.378.5 Fax , p.,,, ',I \I ttl 1 \ ti ul♦\1 111111.1111\'1I1111111II C.'elll l(1 I. v o n I „, /,•,,, II \ \II I It 1 111 \,IIUI l.l,l 1111 If II I) 111', It \It I I I \I \`. 1- 11 %11.11t 11111'1 111 1111 \ \II \Vt I.\ IJ( \I I I \'t� \\`. \It 111 \1 \ \li \1 \ \II 11`AIN 1.\\1111 \I 1111 't October 7, 2009 To Whom It May Concern, I am pleased to write this letter of reference for Mr. Eduardo R. Moreno, Supervisor, Zurqui Construction Services, Inc. A seventeen- classroom addition was built at Nova Middle School and Zurqui Construction won the bid. Before and during the facilities project, Mr. Moreno was on site almost daily, making sure that all facets of the venture ran smoothly and that employees were on task. Now that the project is almost complete, Mr. Moreno still visits the site to ensure that all items are up to par. He is very dedicated to his profession and I highly endorse him in any capacity. C.3 Should you have any questions or concerns, please contact me at 754.323.3709. Sincere Dr. R and Ga cia, Principal RG /rl Truns/nrrrlulg hdu"nNnlr. Chu• .Snlr /en/ of :1 Tim" /iruu urd C'ou//r) /'r.h/ir .Sdn/n / \' la . I n h.i /rrrr/ Op/an•timit}• Lgnu/ : le(- sc h.nlplu� "r I L -= ZURQUI Construction Services, Inc Project Information PHONE & FAX PROJECT MANAGER I EMAIL + 305- 221 -6100 Eddy Gonzales it +305 - 221 -6110 Eddy @zurquis.com Zurqui Construction Services, Inc. tentatively proposes the following schedule and work plan timeline to successfully complete the services requested in this solicitation upon receiving formal Notice to Proceed (NTP). "Protect Timeli ne, Contract and Bond Procurement Notice to Proceed (NTP) Architectural and Engineering Design Permit Process Construction Heritage Park Construction Golden Shores Park 3 Weeks 1 Week 6 Weeks 4 Weeks 4 Months 3 Months Project Closeout / Substantial Completion 1 Month _ -- - _-�ed in Section 4 lapproach /mezhodatogV), as the praject evolves frann a -riases i through 5, possi a an becmutua in design and construction riper mcitua agreement), may affect the proposed timetine. A more defned and solidified timeline can be mvtuaCly agreed woon during contract negotiations. Ir) IC I O I () ZURQUI it. Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 EddyGonzalesk +305- 221 -6110 Eddy @zurquis.com Additional Notes: These drawings are for reference only and should not be used as construction details. They show the general character and rough dimensions of the structural features. Upon request, exact spans, fasteners, materials, and foundations can be determined by a licensed structural engineer. Heritage Park, 2 -5 Area Custom Sail ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com Additional Notes: These drawings are for reference only and should not be used as construction details. They show the general character and rough dimensions of the structural features. Upon request, exact spans, fasteners, materials, and foundations can be determined by a licensed structural engineer. Golden Shores Park Hex Shade U 0 ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305 -221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com SHADE STRUCTURE MATERIAL SPECIFICATIONS Rev. 11/17/11 SUPERIOR SHADE' 1.01 FABRIC SPECIFICATIONS A. UV shade fabric is made of UV stabilized cloth manufactured by ALNET, or approved equal. B. The high density polyethylene ;material shall be manufactured with tensioned fabric structures in mind. C. The fabric knit is to be made using 1nonofilament and tape filler which has a weight of 9.38 to 10.32 oz. sq. yd. Material to be Rachel- knitted to ensure material will not unravel if cut. D. Burst strength of 828 lbf (ASTM 3786). E. Cloth meets fire resistance tests as follows: Alnet Extra Block: California State Fire Marshall Reg. #F -66601 Others: NFPA 701 -99 (Test Method 2) ASTM E -84 F. Fabric Properties STRETCH STENTORED Tear Tests (lbf /ft) WARP 44.8 WEFT 44.0 Burst Tests lb 828 Fabric Weight 1.02 to 1.07 oz /s ft av Fabric Width 91101, Roll Length ISO, Roll Size 63" x 16-.5-- Weight 120 lbs. Life Ex ectanc In ears Fading Minimum fading after 6 years. Note: 3 years for red and yellow, Tem erature - 77 degrees Maximum Tem erature +167 degrees 3. ZURQUI Construction Services, Inc 1.02 THREAD PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com A. Shall be 100% expanded PTFE fiber which carries a 10 year warranty that is high strength and low shrinkage. B. Shall have a wide temperature and humidity range. C. Abrasion resistant and UV radiation immunity. D. Shall be unaffected by non - hydrocarbon based cleaning agents, acid rain, mildew, rot, chlorine, saltwater, and pollution. E. Lockstitch thread — 1200 Denier or equal. F. Chain stitch thread — 2400 Denier or equal. 1.03 STEEL TUBING A. All fabricated steel must be in accordance with approved shop drawings and calculations. B. All steel is cleaned, degreased or etched to ensure proper adhesion of powder -coat in accordance with manufacturer's specifications. C. All steel used on this project needs to be new and accompanied by the mill certificates if requested. Structural steel tubing up to 5 "- 7gauge shall be galvanized pe Allied Steel FLO -COAT specifications. Schedule 40 black pipe fabrications shall be sandblasted and primed as described below. D. All non - hollow structural shapes comply with ASTM A -36, unless otherwise noted. E. All hollow structural steel shapes shall be cold formed HSS ASTM A -53 grade C, unless otherwise noted. F. Plate products shall comply with ASTM A -36. 1.04 POWDER COATING & PRIMING A. All non - galvanized steel shall be sandblasted and primed prior to powder coating using brown fitsed aluminum oxide grit and the following primer. B. All non - galvanized steel must be coated with rust inhibiting primer prior to applying the powder coat. Primer shall be Cardinal Industrial Finishes Corp. E396 — GR1372 epoxy powder coating semi gloss smooth zinc rich primer. C. Welds shall be prin-►ed with rust inhibiting primer prior to applying the powder coat. Primer shall be Cardinal Industrial Finishes Corp E396- GR1372 epoxy powder coating semi gloss smooth zinc rich primer. 2 I () ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy@zurquis.com D. All steel parts shall be primed for rust protection and finished with a minimum 3.5 mil thick UV- inhibited weather resistant powder coating. E. Characteristics: Powder used in the powder -coat process shall have the following characteristics: N.3.1 Specific gravity 1.68 + / -0.05 N.3.2 Theoretical coverage 114+/- 4 ft 2 /lb /mil N.3.3 Mass loss during cure < 1% N.3.4 Maximum storage temperature 75 degrees F E. Powder - coating shall ineet the follo-,N•ing tests: ASTM Gloss at 60 degree 85 -95 HOI TM 10.219 PCI Powder smootimess 7 ASTM D2454 -91 Over -bake resistance time 200% ASTM D3363 -92A Pencil hardness H -2H ASTM D2794 -93 Dir/Rev Impact, Gardner 140/140 in/lbs ASTM D3359 -95B Adhesion, cross hatch 5B Pass ASTM D522 -93A Flexibility Mandrel 1/4" dia. No fracture ASTM B1 17 -95 Salt Spray 1,000 hours UL DtOV2 Organic coating steel enclosures, elect e . Recognized F. Application Criteria N.5.1 Electrostaticspray cold Substrate:0.032 in. CRS N.5.2 Cure Schedule 10 minutes at 400 degrees F N.5.3 Pretreatment Bonderite 1000 N.5.4 Film Thickness 3.5 Mils 1.05 WELDING A. All shop welds shall be executed in accordance with the latest edition of the American Welding Society Specifications. N ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com B. Welding procedures shall comply in accordance with the AWS D 1. 1 -AWS Structural Welding Code - Steel. C. All welds to be performed by a certified welder. All welds shall be continuous when length is not given, unless otherwise shown or noted on drawings. D. All welds shall develop the full strength of the weaker member. All welds shall be made using E70xx.035 wire. E. Shop connections shall be welded unless noted otherwise. Field connections shall be indicated on the drawings. Field — welded connections are not acceptable. F. All fillet welds shall be a minimum of `/4" unless otherwise noted. G. All steel shall be welded shut at terminations to prevent internal leakage. H. Internal weld sleeving is not acceptable. I. On -site welding of any component is not acceptable. 1.06 SEWING A. On -site sewing of a fabric will not be accepted. B. All corners shall be reinforced with extra non -tear cloth and strap to distribute the load. C. The perimeters that contain the cables shall be double lock stitched. 1_07 INSTALLATION HARDWARE A. Bolt and fastening hardware shall be determined based on calculated engineering loads. B. All hardware shall be marine grade stainless steel and shall comply with SAE -J42S (Grade 8) or ASTM A325 (Grade BD). All nuts shall comply with ASTM F -594, alloy Group 1 or 2. C. Wire rope cable shall be 7x19 strand stainless steel wire rope with a breaking strength of 7,000 lbs_ (1/4" diameter) for shades generally under 300 sq. ft. unless requested larger by the customer. For shades >300 sq. ft. cable shall be 5/16" X9800# breaking strength. For special wincly conditions, cable system may be up -sized by engineering. D. All fittings required for proper securing of the cable are hot dipped galvanized. 1.08 CONCRETE A. Concrete work shall be executed in accordance with the latest edition of I_I !m It) -) ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL + 305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com American Concrete Building Code ACI 318 unless specified by the governing municipality. B. Concrete specifications shall comply in accordance -,i-ith, and detailed as per plans as follows: 1. 28 Days Strength F'c = 2500 psi 2. Aggregate: HR 3. Slump: 3 -5 4. Portland Cement shall conform to C -150 5. Aggregate shall confonn to ASTM C -33 C. All reinforcement shall confonn to ASTM A -615 grade 60. D. Reinforcing steel shall be detailed, fabricated and placed in accordance with the latest ACI Detailing Manual and manual of Standard Practice. E. Whenever daily ambient temperatures are below 80 degrees Fahrenheit, the contractor may have mix accelerators and hot water added at the batch plant (See Table 1). F. The contractor shall not pour any concrete when daily ambient temperature is below 55 degrees Fahrenheit. Temperature Range % Accelerator Type Accelerator 75 -80 degrees 10/0 High Earl (non calcium) 70 -75 degrees 2% High Earl (non calcium) Below 70 degrees 3% High Earl non calcium 1.09 FOOTINGS A. All anchor bolts set in new concrete shall be ASTM A -307 B. All anchor bolts shall be zinc plated unless specified otherwise. C. Footings shall be placed in accordance with and conform to engineered specifications and drawings. 5 ILIA 111154111111111111111 1[rlIIIIIIIIIIIIIII ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL + 305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com 3 2 1 - - -- - - -- Column Bracket 5'8" Shackle C, 5'8" Eye Nut — 518" Drive Fan Plate Tension tut NOTE: Secure Shackle Pin To Shackle With Plastic Wire Tie. Jam nuts— TOP Jam Hob 2 3 StaNna Stock Position /I &V Shackle Comer 518" Eye Nut 114" Hex tlut 1.4" Washer �iShackle Pin ,gam I I r-Washe X01 �n1 Jam lluts� Tension tlut Washer I Jam Nut 0 8 Retainer Plate 3 u" Drive 114 "Washer Welded Holding ttul—I 114" z 1 la, Button Screw SUPERIOR SHADE oeacam 5/8on: ' STANDARDTEN5ION DRIVE All Hardware Marine 9c.uc: 9nAG1 9-1: 9n9 cr: Grade Stainless Steel acs AoARaoLLT�"�A 30 �„""D Varies Sail Shades , OF DwrC Unrta: 1.888-829-8997 13.18109 racnca % Fccr 2 1 - -- ZZA- - -- 1 2 3 Im I IJ ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 EddyGonzalesk +305- 221 -6110 Eddy @zurquis.com Q� �1 O rO 0 H � ee on 0 d L ^ L 79 b wN 'O CO vi G6 o cLa � a h u y b v C R = W N V H O N d u O = L � 7 � 3 0 al w ZURQUI Construction Services, Inc PHONE & FAX + 305- 221 -6100 + 305- 221 -6110 S U P ER I U R SHADETM o UPE, DESIGN CRITERIA PROJECT MANAGER I EMAIL Eddy Gonzales Jr Eddy @zurquis.com 2009 International Building Code with Individual State Ammendments. Dead Load: 0.10 PSF + Structure Dead Weight. Snow Load: Ground Snow Load: 0 PSF Snow Exposure Factor: 1.0 Snow Load Importance Factor: 1.0 Thermal Factor: 1.2 Wind Load: Basic Wind Speed: 90 MPH Wind Importance Factor: 1.0 Wind Exposure Category: C Gust Effect Factor: 0.892 Seismic Design: Seismic Importance Factor: 1.0 Seismic Site Class: D Seismic Design Category: D Basic Seismic Force Resisting System: Cantilevered Columns Detailed To Intermediate Moment Frames Concrete: 3,000 PSI Minimum (28) Day Comp. Stregth. Bar Reinforcement Shall Conform to ASTM -A615, Grade 60. Footer To Be Poured in Undisturbed Soil. Do Not Form. Foundation Sized Is Based On Individual State Building Officials Ammendment to IBC 2009. Allowable Soil Bearing Pressure: 1,000 PSF Allowable Lateral Bearing Pressure: 100 PSF /FT Coefficient of Friction for Lateral Sliding Resistance: 0.25 Exposure Class: S2 Connection Bolts Shall Conform To ASTM A325. All Steel Connection Plates Shall Comply With ASTM A36. (Fy =36 KSI) All Round Mechanical Tubing Shall Comply With ASTM A519. (Fy =42 KSI) All Schedule 40 Steel Pipe Shall Comply With ASTM A53 Grade B. (Fy =35 KSI) Cable: 1/4" Stainless Steel Cable Shall Have A Nominal Strength of 7,000 lbs. 5/16" Stainless Steel Cable Shall Have A Nominal Strength of 9,800 lbs. 3/8" Stainless Steel Cable Shall Have A Nominal Strength of 14,400 lbs. Iff 10 11K 1U �-) ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com w� Color ChorE SUPERIORS ADE" !lJi�1W5:19 Yellow White Tan Burgundy Butterscotch • • • - - Ronan Bluo* Patina Green* *Indicates colors that are 30% gloss. All Silver other colors are 90% gloss. True Blue Black Forest Green Yello -,v Sunblaze �Rivergum Green Beige Sky Blue Navy Blue Silver Plain Cream Turquoise Due to printing process, colors may vary from actual product. Please contact your dealer for color samples. ZURQUI ' Construction Services, Inc L i U C .Q ®~ C 0 ^U W e� 0 DIM d� .it 0 ,00UU U a c O U U > .o N N } .� to C O C � 'C O O } Q. H v� v U O c v = o S V O .o' U vi � o tV —� N v � i ±- Q N N O L U U oQ C o rn >r 0 PHONE & FAX PROJECT MANAGER ( EMAIL + 305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com 6— H C N � 0 } O U� vpi W v wj N �w � a- W i � v } C � v N H C N O U o U o v t� a� 0 v c ,o U �C 00 o U Ce. c c o UU4 v a ZU RQU ( Construction Services, Inc PHONE & FAX PROJECT MANAGER EMAIL + 305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com DELIVER TO: City of Sunny Isles Beach Request for Proposal City Clerk SECTION 6 OPENING: 10:00 A.M. 18070 Collins Avenue BID SUBMITTAL FORMS 11/07/2011 Sunny Isles Beach, FL 33160 PLEASE QUOTE PRICES F.O.B. DESTINATION, LESS TAXES, DELIVERED IN CITY OF SUNNY ISLES BEACH, FLORIDA NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State and Local). Bid price should be less all taxes. Tax Exemption Certificate shall be furnished upon request. Issued by: Purchasing Agent Date Issued: This Bid Submittal Consists of 10/14/2011 Pages 29 through 32 Sealed bids are subject to the Terms and Conditions of this Invitation to Bid and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data are attached or Incorporated by reference In the Bid Submittal will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. RFP 11 -10 -01 DESIGN AND CONSTRUCTION OF CANOPY STRUCTURES AT HERITAGE PARK AND GOLDEN SHORES PARK A Bid Deposit in the amount of 53�Q of the total amount of the bid shall accompany all bids. A Performance and Payment Bond In the amount of 1000/o of the total amount of the bid will be required € upon execution of the contract by the successful bidder and The City of Sunny Isles Beach. Procurement Agent: Firm Name: Marcanthony Tulloch Zurqui Construction Services, Inc. Commodity Code(s): RETURN ONE ORIGINAL AND FOUR COPIES OF BID SUBMITTAL PAGES AND AFFIDAVITS FAILURE TO SIGN PAGE 32 OF SECTION 6 BID SUBMITTAL WILL RENDER YOUR BID NON- RESPONSIVE PAGE 29 of 33 BID No. 11 -1001 ZURQUI Construction Services, Inc PHONE &FAX PROJECT MANAGER I EMAIL + 305- 221 -6100 Eddy Gonzales Jr +305- 221 -6110 Eddy @zurquis.com SEcTION 6 BID SUBMITTAL. FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: L.ISTED BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID; Addendum #1, Dated October 21st, 2011 Addendum #2, Dated October 25th, 2011 Addendum #3, Dated October 28th, 2011 Addendum #4, Dated _ October 28th, 2011 Addendum #6, Dated November 8th, 2011 Addendum #6, Dated November 16th, 2011^ Addendum #7, Dated Addendum #8, Dated PART II: [] NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID FIRM NAME: Zurqui Construction Services, I AUTHORIZED SIGNATURE, �.cJ DATE: November 14th, 2011 TITLE OF OFFICE : P esicien i ZURQUI Construction Services, Inc PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr +305 - 221 -6110 Eddy @zurquis.com C r r,- BID SUBMITTAL FORM Bid Titte: DESIGN AND CONSTRUCTION OF CANOPY STRUCTURES AT HERITAGE PARK AND GOLDEN SHORES PARK The undersigned Proposers proposes and agrees, if this Bid is accepted, to cater into an agreement with The City of Sunny Isles Beach (in die form included in the contract documents) to perform and furnish all work as specified or Indicated in the contract documents t'or the contract price anti within the contract time indicated in this bid and in accordance with the other terms and conditions of the contract documents. The Proposer(s) accepts all of the terms and conditions of the advertisement or request for proposals and Instructions to Proposers, including without limitation those dealing with the disposition of bid Security. 'Phis bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and submit the agreement with the bonds and other documents required by the bidding requirements within ten clays after the dale of the City's notice of award. In submitting this Bid, the Proposer represents, as more fully set forth in the agreement, that: • The Proposer has familiarized himself /herself with the nature and extent of the contract documents, locality, all local conditions and Law and Regulations that in any manner may affect cost, progress, performance or furnishing of the work. This Bid Is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and Is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; 0 the Proposer has not directly or Indirectly induced or solicited any other Proposers to submit a false or sham bid; the Proposer has not solicited or Induced any person, firm or corporation to refrain from bidding; and Proposer has not sought by collusion to obtain for Itself any advantage over any other Proposers or over the City. FIRM NAME: Zurqui Construction Services, Inc. _ Street Address: 9755 SW 40th Terrace, Miami, Florida 33165 Mailing Address (If different): Telephone No. (305) 221 -6100 Fax No. (305) 221 -6110 Email Address: Vicente@zurquics.com FEIN No. 65-0139632 * "BY sravrNG THIS DOCUMENT THE BIDDER AGREES TO ALL TERMS PAGE 31 OF 33 Elio No. ZURQUI Construction Services, Inc SIGNATURE: (SIGNA -rURE OF AUTHOP l PRINT NAME: Mr. Eddy President PHONE & FAX PROJECT MANAGER I EMAIL +305- 221 -6100 Eddy Gonzales Jr + 305- 221 -6110 Eddy @zurquis.com THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND 13Y THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON - RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. RAGE 32 or 33 ntf) No. i 10 10 10 I() e ZURQUI Construction Services, Inc