Loading...
HomeMy WebLinkAboutR.J. Behar & Co.ElR.J.Behar & Company, Inc. December 2 °d, 2011 Ms. Jane A. Hines, CMC — City Clerk City Clerk's Office City of Sunny Isles Beach Government Center 18070 Collins Avenue Sunny Isles Beach, FL 33160 RE: TRAFFIC ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS No. 11 -11 -01 Dear Ms. Hines: HEM° E'`<1.;`' D' 2 2u�1 W�6 Le).. 02- 04W City of Sunny isles Beadh Office of the City Clerk R. J. Behar & Company, Inc. (RJ Behar) is most pleased to submit five (5) sets, one (1) original and four (4) copies of completed packages for this Request for Qualifications to provide Traffic Engineering Services for the City of Sunny Isles Beach. We are confident that we can provide you with the quality professional services you need for successful completion of this contract. RJ Behar was founded in 1999 to provide consulting services to public and private clients throughout South Florida. Our firm has grown during that period of time to 46 employees. Our steady growth has been based on providing quality services with a client service- oriented approach. In this short time, we have secured continuing service contracts with the following municipalities: the Cities of Miami, Hialeah, Fort Lauderdale, Coral Springs, Sunrise, Miramar, Lauderdale Lakes, Lauderhill, Town of Southwest Ranches, and the Town of Davie. RJ Behar also has continuing services contracts with Miami -Dade County, Broward County, Martin County and Palm Beach County, Central Broward Water Control District (CBWCD), Florida Department of Transportation (FDOT), and South Florida Water Management District (SFWMD). Our office, located at 7850 NW 1461h Street, Suite 504, Miami Lakes, FL 33016 will be responsible for this project. The contact person is Mr. Javier Rodriguez, P.E., who can be reached at (305) 558 -3777, e -mail j.rodriguez @rjbehar.com. PERSONALIZED SERVICE The ability of a consulting firm to serve its clients is a function of the staffs experience and the philosophy of the firm. RJ Behar is proud of the technical competence of its staff and the shared commitment to quality. Our Quality Control process is very comprehensive and has resulted in a history of zero claims due to errors or omissions. MR. JAVIER RODRIGUEZ, PE will be our proposed project manager and single point of contact. His extensive civil engineering experience will inspire this highly talented team to meet the City's traffic engineering requirements. Mr. Rodriguez has over 24 years of engineering experience, including significant experience in urban and rural roadway design of municipal projects. He has managed numerous civil engineering projects throughout South Florida. His pro- active management style is geared towards providing the municipalities a cost - efficient, on- schedule and successful project. There is no learning curve for us and we pledge to give the City of Sunny Isles Beach our undivided attention. MR. ROBERT J. BEHAR, PE, Principal -In- Charge, has over 35 years of civil engineering experience. He has also been involved in a plethora of municipal design projects. Mr. Behar specializes in roadway geometrics and traffic operations. He also has worked on various infrastructure projects, and is very familiar with the municipal planning 7850 N.W. 14611, STREET, SUITE 504, MIAMI LAKES, FL 33016•TEL 305 - 558- 3777•FAx 305 - 558 -8909 R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 1 process. He has participated, either as a project manager or as principal in charge, in over 100 engineering projects throughout South Florida, many of which are constructed and running smoothly. MR. JUAN H. VAZQUEZ, PE, PH, BCEE will be our Quality Assurance and Quality Control Officer. Mr. Vazquez is a professional hydrologist (PH), a Board Certified Environmental Engineer (BCEE), and has more than 26 years of civil engineering experience including the design of water and wastewater projects, preparation of stormwater master plans, drainage studies, street improvements, hydrologic /hydraulic (H -H) and scour studies, and utility relocations. As a QA /QC officer, he will monitor all work performed under this contract and warranty its success. 124 ` [9P U1111111 41Zc ] :111F_\ ` I I7 W / » :111 1 `H 4 The Principals of the RJ Behar Team have provided civil, transportation engineering, planning, environmental, infrastructure and construction management to South Florida clients for more than 37 years. From our project examples listed within the proposal, you will notice that RJ Behar's Staff has vast experience and knowledge working on general engineering services for many municipalities. I personally will assure the overall successful completion, in terms of quality, timeliness, and budget. For the team, I enthusiastically offer this proposal and look forward to establishing a most favorable relationship between the City of Sunny Isles Beach and RJ Behar. WE HOPE THAT THE ATTACHED MATERIALS WILL LEAVE YOU SHARING OUR BELIEF THAT THE INTERESTS OF THE CITY OF SUNNY ISLES BEACH AND THOSE YOU SERVE CANNOT BE BETTER FULFILLED THAN WITH OUR QUALIFIED RJ Behar TEAM. Sincerely, R. J. BEHAR & COMPANY, INC. T-" '2-, Robert J. Behar, P.E. President /CEO 7850 N.W. 14611, STREET, SUITE 504, MIAMI LAKES, FL 33016-TEL 305 - 558- 3777•FAx 305 - 558 -8909 R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 2 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S TABLE OF CONTENTS 1 . COMPANY INFORMATION 2. QUALIFICATIONS 3. STAFFING 4. APPROACH /METHOLOGY 5. REFERENCES 6. OFFICE LOCATION 7. CONTRACT FORMS ElR.J.Behar R. I. BEHAR & COMPANY, INC. I RFQ N0. 11 -11 -01 1 1 C I T Y OF S U N N Y I S L E S T R A F F 1 C E N G I N E E R 1 N G S E R 1. COMPANY INFORMATION NAME OF AGENCY/COMPANY: R. J. Behar & Company, Inc, B E A C H V I C E S COMPANY LOCATIONS: Currently, RJ Behar has three offices, one office in Miami -Dade County, an office in Broward County, and one in Palm Beach County. MIAMI -DADE COUNTY OFFICE 7850 NW 146th Street, Suite 504 Miami Lakes, FL 33016 Contact Name: Mr. Javier Rodriguez, PE Project Manager Tel: (305) 558 -3777 Fax: (305) 558 -8909 E -mail Address: j.rodriguez @rjbehar.com BROWARD COUNTY OFFICE 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 Contact Name: Mr. Robert J. Behar, PE President10EO Tel: (954) 680 -7771 Fax: (954) 680 -7781 E -mail Address: bbehar @rjbehar.com PALM BEACH COUNTY OFFICE 12788 Forest Hill Boulevard, Suite 2003B Wellington, FL 33414 Contact Name: Mr, Sean F. O'Keefe, PE Project Manager Tel :( 561)333 -7000 Fax:( 561) 333 -7001 E -mail Address: sokeefe @rjbehar.com INTERNET WEB SITE ADDRESS: www.rjbehar.com DETAILS OF ENTITY BUSINESS STRUCTURE (CORPORATION, PARTNERSHIP, LLC): R. J. Behar & Company, Inc. is a Corporation. DATE FOUNDED: R. J. Behar & Company, Inc. was founded in October 4, 1999, HOME ADDRESS. TELEPHONE NUMBER, AND LOCAL ADDRESS AND PHONE NUMBER: HOME OFFICE ADDRESS LOCAL OFFICE ADDRESS 6861 SW 196th Avenue, Suite 302 7850 NW 146TH Street, Suite 504 Pembroke Pines, FL 33332 Miami Lakes, FL 33016 Tel: (954) 680 -7771 Tel: (305) 558 -3777 LIST OF ANY OUTSTANDING LITIGATION THAT WOULD THREATEN THE VIABILITY OF THE FIRM OR THE PERFORMANCE OF THIS CONTRACT: RJ Behar, its principals, or officers have never been debarred or suspended from bidding by any government during the last five years or since the firm's inception. R. J. Behar & Company, Inc does not have any outstanding litigation that would threaten the viability of the firm in the performance in this contract. PROOF OF INSURANCE: See attached copies INDICATION OF HOW LONG IT WOULD TAKE TO IMPLEMENT SERVICE AFTER AUTHORIZED TO BEGIN: This project will take 3 weeks for survey and design development, 4 weeks for construction documents and 6 weeks for permitting. 1 R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 1 .acoR CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDDYYYY) 11/16/2011 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED PRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. ?ORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Jerry O Ola NAME: y y HONE -4225 (866)550 -4082 Greyling Insurance Brokerage P (]]0) 552 o; 450 Northridge Parkway ADDRESS :jerry.noyola @greyling.com .Suite 102 INSURERS AFFORDING COVERAGE NAIC # Atlanta GA 30350 INSURERA:Sentinel Insurance Company, LTD 11000 INSURED INSURERB:Continental Casualty Company 20443 R.J. Behar & Company, Inc. INSURER C : 6861 S.W. 196th Avenue INSURERD: Suite 302 INSURER E: Pembroke Pines FL 33332 INSURER F: r0VFRAGFS CERTIFICATE Nl1MBFR:11 -12 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE INSR WVD POLICY NUMBER MMI DYYYY MM / D YYYY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE TO PREMISES (Ea olccur ence ) $ 1,000, 000 A CLAIMS -MADE FxI OCCUR 20SBMAC0037 11/17/201111/17 /2012 MED EXP (Any one person) $ 10,000 PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP /OP AGG $ 2,000,000 $ POLICY X PRO LOC AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT Ea accident 1,000,000 BODILY INJURY (Per person) $ A ANY AUTO ALL OWNED SCHEDULED AUTOS AUTOS 20UECNG0289 11/17/201111/17 /2012 BODILY INJURY (Per accident) $ PROPERTY DAMAGE Per accident $ X HIRED AUTOS X NON -OWNED AUTOS X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 3,000,000 AGGREGATE $ 3,000,000 A EXCESS LIAB CLAIMS -MADE DED I X I RETENTION$ 10, 00C $ 20SBMAC0037 11/17/2011 11/17/2012 WORKERS COMPENSATION AND EMPLOYERS' LIABILITY YIN WC STATU- OTH- R I = ANY PROPRI ETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? � N/A (Mandatory in NH) E.L. DISEASE - EA EMPLOYE $ If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ B Professional Liability EH 28 836 36 39 11/17/201111/17 /2012 Per Claim $2,000,000 Aggregate $3,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS 1 VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) GtR I IFIGA SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN For Proposal Purposes ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE Joshua Howell /JERRY ACORD 25 (2010/05) ©1988 -2010 ACORD CORPORATION. All rights reserved. INS025r,?ninnsim Thn Arnpin nmmn nnel Innn — rnnicfnrnrl mnrtrc of Arnpn M m �r— 0 0 d, m-- 0 a 0 r 0 o —� w_. 013283 7RAVELERSJW WORKERS COMPENSATION AND EMPLOYERS LIABILITY POLICY TYPE V INFORMATION PAGE WC 00 00 01 ( A) POLICY NUMBER: (IDTEHUB- 63BM363 -8 -11 ) NEW -1 1 INSURER: THE TRAVELERS INDEMNITY COMPANY OF AMERICA 1 INSURED: R.J. BEHAR & COMPANY INC 6861 SW 196TH AVE #302 FORT LAUDERDALE FL 33332 Insured is A CORPORATION NCCI CO CODE: 13439 PRODUCER: AUTOMATIC DATA PROC INS 71 HANOVER RD FLORHAM PARK NJ 07932 Other work places and identification numbers are shown in the schedule(s) attached. 2. The policy.period is from 01 -01 -11 to 01 -01 -12 12:01 A.M. at the insured's mailing address. 3. A. WORKERS COMPENSATION INSURANCE: Part One of the policy applies to the Workers Compensation Law of the state(s) listed here: FL B. EMPLOYERS LIABILITY INSURANCE: Part Two of the policy applies to work in each state listed in item 3.A. The limits of our liability under Part Two are: Bodily Injury by Accident: $ 1000000 Each Accident Bodily Injury by Disease: $ 1000000 Policy Limit Bodily Injury by Disease: $ 1000000 Each Employee C. OTHER STATES INSURANCE: Part Three of the policy applies to the states, if any, listed here: AL AR AZ CA CO CT DC DE GA HI IA ID IL IN KS KY LA MA MD ME MI MN MO MS MT NC NE NH NJ NM NV NY OK OR PA RI SC SO TN TX UT VA VT WI WV D. This policy includes these endorsements and schedules: SEE LISTING OF ENDORSEMENTS - EXTENSION OF INFO PAGE 4. The premium for this policy will be determined by our Manuals of Rules, Classifications, Rates and Rating Plans. All required information is subject to verification and change by audit to be made ANNUALLY. DATE OF ISSUE: 01 -04 -11 AD OFFICE: PAYROLL 70A PRODUCER: AUTOMATIC DATA PROC INS XV770 C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G 1 N E E R I N G S E R V I C E S 2. QUALIFICATIONS i PROFESSIONAL QUALIFICATIONS RJ Behar offers an extremely qualified group of individuals whose qualifications, experience and capabilities are especially suited for the development of the project requested in this contract. We have assembled a team of seasoned professionals with supporting staff members to undertake any assignment that could come up in this Request for Qualifications for Traffic Engineering Services. Our team has successfully completed similar engineering contracts for various government and municipal agencies. Several projects of the proposed team have received or have been nominated to receive engineering or architectural awards. We pride ourselves in meeting our client's needs through the use of proper project management and an extensive quality assurance program. We incorporate, in- house, all the major disciplines required to serve the City of Sunny Isles Beach. These services include: Roadway /Highway Design, Traffic, Transportation Planning Engineering, Civil Engineering, Water Resources and Stormwater Master Planning, Environmental Engineering as well as Construction Engineering and Inspection services. We provide the design of paving drainage, water distribution systems and sanitary sewer systems associated with land development projects. We are experienced in obtaining permits from state agencies such as the Water Management Districts, Department of Environmental Protection, the Florida Department of Transportation, Health Department and numerous City and County agencies thought South Florida. Our engineers bring a wealth of expertise as well as over 37 years of experience in the engineering field. ROADWAY DESIGN Our staff has extensive roadway design experience, most of which began from including design of major arterial roadways such as: NW 87th Avenue in Miami -Dade County, Powerline Road (SR -845) in Boca Raton, SR -A1A in Palm Beach County, Alton Road (SR -907) in Miami Beach, SW 27th Avenue (SR -9) in Miami, Kendall Drive (SR -94) in Kendall, Okeechobee Road (SR -25) in Hialeah Gardens and Andrews Avenue in Pompano Beach. We also have roadway design experience on local city streets such as W. 33rd Street, W. 74th Street in the City of Hialeah, W. 44th Street in the City of Lauderdale Lakes, E. Palomino Drive & SW 62nd Court in the Town of Southwest Ranches, Bayshore Drive in the City of Miami, NW 13th Street & NE 15th Avenue in the City of Fort Lauderdale and 19 miles of street resurfacing in the City of Tamarac. Our comprehensive roadway design services include: geometric design, signing and marking design, signalization design, lighting design, utility coordination and traffic control plans. In addition, RJ Behar has extensive experience in the design of modern roundabouts. We have provided contract documents for several roundabouts. Roundabouts were designed at Palm Avenue /E. 17th Street in the City of Hialeah, NE 15th Avenue /NE 18th Street in the City of Fort Lauderdale, SW 176th Street and NW 146th Street in Miami -Dade County. FREEWAY DESIGN Our staff has a wide freeway design experience including design of interstate facilities, major urban expressways and toll facilities. RJ Behar's capabilities include geometric design, signing and marking, drainage design, traffic control plans, structural design, rest areas and toll plazas. Recent projects include: 1 -75 1Griffin Road Interchange, 1 -95 3R and 1 -95 HOV lane additions in Palm Beach County, Turnpike Safety Improvement in Miami -Dade & Broward Counties, Turnpike widening in Broward County, Memorial Causeway in the City of Clearwater, SR -836 Dolphin Expressway, SR -874 Don Shula Expressway, Gratigny Expressway Resurfacing, SR -80 Turnpike Interchange and the 1 -95 Pump Station. 1] R.j.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 1 C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G 1 N E E R I N G S E R V I C E S TRANSPORTATION AND TRAFFIC ENGINEERING In approaching all transportation planning projects, RJ Behar integrates the land use issues and transportation relationships in order to provide the proper balance between the travel modes and the operation of the facility, taking into consideration the social, environmental and engineering constraints, and available funding to provide innovative and practical solutions for our clients. We also recognize the importance of involving the public throughout our planning process in order to obtain meaningful solutions, which increase our chances towards a successful project. We strive to develop smooth flowing, pedestrian friendly transportation solutions for all our clients. TRAFFIC PLANNING RJ Behar has developed extensive expertise in the Transportation Planning and Traffic Engineering field. We have become very familiar with the Manual of Uniform Traffic Control Devices (MUTCD), The Florida GreenBook, Florida Department of Transportation Standards, American Association of State Highway and Transportation Officials (AASHTO), The Broward County Land Development Code and many city code ordinances. Additionally, RJ Behar owns data capturing equipment and has in -house trained staff to collect and process traffic volume data. We can perform traffic volume counts, speed studies, turning movement counts, vehicle classification studies and vehicle cut - through analysis. These traffic data gathering services are performed by our in -house staff and do not require the involvement of a third party subconsultant. This allows us flexibility and the ability to respond to our client's request for these services efficiently and on short notice. RJ Behar has state of the art computer equipment and all of the latest engineering software to produce any necessary traffic plan including Synchro, CORSIM and TSIS, McTRANS HCS +T, TRAXPro, Cube 5, PETRAPro, and TCU. TRAFFIC STUDIES AND TRAFFIC OPERATIONS REPORTS RJ Behar has a substantial amount of experience. We have prepared numerous traffic studies for FDOT, MDX and various municipalities. We recently completed the IOAR for the 1 -75 /Griffin Road Interchange for FDOT, District 4. For MDX, we are currently completing the IJR for a new interchange on SR -874 in Miami - Dade County. These studies require approvals from each of the respective District's DIRC, District 4's IOAR also required the approval from FHWA. The MDX IJR required the approval from the FDOT Central Office, Both were very challenging and complex studies. We are currently completing a major traffic study for the very complex NW 87th Avenue /Okeechobee Road /NW 103rd Street intersection. This study will require public involvement and coordination with the local municipality and Miami -Dade County Public Works. The study also requires geometric reviews for sight distance and operations. For the Miami -Dade County Traffic Division, we recently completed the NW 107th Avenue Feasibility Study through the Town of Medley, which required extensive traffic engineering studies and the FIU Traffic Study. On the municipal side, RJ Behar has provided speed studies, access management studies and prepared a citywide traffic study for the Town of Southwest Ranches. CIVIL ENGINEERING MUNICIPAL ENGINEERING RJ Behar has extensive experience in municipal engineering. We understand the governmental engineering process, the bid process, contract administration and working with City commissions associated with municipal engineering. The keys to providing successful municipal engineering services include: Being responsive, adapting to performing under short notice, learning to be an extension to the City's Staff, understanding the City's budgetary constraints, being user friendly, delivering on our promise and providing quality products. Our experience and expertise is extensive and includes: Roadway and Street Improvements, Traffic Signal Design, Pavement, Marking and Signing Design, Traffic Control Plans, EJR.).Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 2 C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G I N E E R I N G S E R V I C E S Lighting Plans, Drainage and Permitting, Water and Sewer Plans, Utility Relocation Design and Relocation Plans, as well as Public Involvement. SITE PLANNING RJ Behar provides services in the area of site planning ranging from small scale commercial site planning to master planning for mixed -use projects. We provide the design of paving, drainage, water distribution systems and sanitary sewer systems associated with land development projects. We are experienced in obtaining permits from state agencies such as the Water Management Districts, Department of Environmental Protection, the Florida Department of Transportation, the Health Department and numerous City and County agencies throughout South Florida. WATER RESOURCES & STORMWATER MASTER PLAN RJ Behar has considerable expertise in the area of water resources. Our staff has developed proficiency in the design and analysis of wastewater and water distribution systems. We have designed water and sewer services for commercial sites and our staff has developed wastewater and water distribution plans for citywide systems and to service Industrial Parks and new communities. Our experience ranges from designing sewer laterals and water services for a proposed site, to trunk lines and complete sewer service neighborhood retrofit projects. We have also designed lift stations and force mains, and have extensive experience with the planning and design of stormwater management projects. RJ Behar completed plans for the Shady Banks (Septic Area 5) septic tank conversion to a sanitary sewer system and for the waterline improvements at Sistrunk Boulevard for the City of Fort Lauderdale. Currently, we are a working on a project for the Broward County Water and Wastewater Services Department. We participated in the Waterworks program for the City of Fort Lauderdale. In these contracts, RJ Behar has designed water distribution systems, conversion of septic tank neighborhoods to wastewater collection systems, new pump station design, rehabilitation of existing lift stations, electrical and mechanical evaluations, preparation of Basis of Design Reports (BODR), reviewed master planning documents, evaluated sites for communication towers, hydraulic analyses and calculations, as well as construction administration and observation services. RJ Behar has developed expertise and specializes in the area of stormwater and water resources. Currently, RJ Behar provides water resources services as a consultant to the South Florida Water Management District, is one of the two drainage engineers for the Central Broward Water Control District, and has provided drainage design services to FDOT Districts 6, 4 and the Turnpike. We have followed the development and attended training on the new stormwater rules. FAMILIARITY WITH PERMITTING AGENCIES RJ Behar has extensive experience with permitting, roadway, drainage, water and sewer and site design projects. Our experience has been enhanced while providing similar services to other municipal, county and state clientele. The relevant agencies and types of permits in which the RJ BEHAR Staff has recently been involved with include: MIAMI -DADE COUNTY PUBLIC WORKS DEPARTMENT: On projects connecting to County roads and /or existing drainage systems. The RJ BEHAR Team has worked closely with the County's staff over the past years. These include extensive coordination with the Miami - Dade County Environmental Resource Management (DERM) while obtaining drainage permits for the City of Hialeah roadway projects and for stormwater studies. The RJ BEHAR Team has also worked closely on a number of roadway projects with the County's Highway Division. Water distribution systems and sewage collection systems will also require permits from DERM. 1 R.j.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 3 C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G I N E E R I N G S E R V 1 C E S STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATIONS: i This agency is now known as the Department of Environmental Protection (DEP). A permit from this agency is required by any agency proposing to construct projects permitted under the "General Permit for Construction of an Extension to a Public Drinking Water Distribution System" pursuant to Rule 62- 555.540, Florida Administrative Code (F.A.C.). Also, a permit from the DEP must be submitted for projects not permitted under the general permit procedures and criteria specified in Rule 17- 604.700, The applicability of requirements to new facilities and modifications of existing facilities is described in Chapter 17 -604 F.A.C. SOUTH FLORIDA WATER MANAGEMENT DISTRICT: This agency permits all activities related to stormwater management systems and environmental resource (dredge and fill) activities; although in Miami -Dade County the stormwater management systems are permitted through DERM. The RJ BEHAR Team has permitted and worked closely with the South Florida Water Management District (SFWMD). STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION: The FDOT requires permits for roadway and site development projects which connect to an FDOT designated roadway. A Driveway Connection permit and /or a Drainage Connection permit may be required. The RJ Behar Team has recently obtained such a permit on the Palm Avenue and E. 1St Avenue projects, both which connect to state roads. Drainage Connection permits will comply with FDOT Rule 14- 86, F.A.C. In order to have a permit issued, the applicant must show that the proposed drainage system will be designed, constructed, operated and maintained in conformance with the criteria described in the FDOT "Handbook for Drainage Connection Permit ", February 1987. Many of our staff members are former FDOT employees and are very familiar with FDOT Standards and Specifications. CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES RJ Behar is certified by FDOT in Construction Engineering Inspections Services. RJ Behar offers a full range of construction engineering services. These services range from providing Construction Engineering & Inspection (CE &I) to providing on -call site engineering services for land development and municipal projects. The key to our success in providing contract administration service includes: proper interpretation of the construction bid documents, maintaining detailed documentation throughout the construction, documenting change orders and quantity revisions, documenting changes in field conditions and being responsive. Our proposed team members are all trained and certified, They are familiar with all of the A w required contract provisions for construction ®'"M_. contracts including all monitoring and reporting requirements, contract and project billing documentation. We provide both infrastructure inspection as well as building inspection services. Our construction management team includes licensed General Contractors and licensed Threshold Inspectors. Please refer to our Business Licenses and Professional Certification on the following page. EJR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ N0. 11 -11 -01 1 4 C I T Y OF S U N N Y I S L E S T R A F F I C E N G I N E E R 1 N G S E R B E A C H V I C E S f BUSINESS LICENSES AND PROFESSIONAL CERTIFICATIONS SECRETARY OF STATE CORPORATE State of Florida Department of State I certify' from the records of this office that R.,I 13EHAR & CONIPANI', INC. is a corporation organized tinder the laws of the State of I'lorida, filed on Oeloher 4, 1999 The document number of this corporation is 199000088I84. 1 further certify that said corporation has paid all fees due this office Through December 31, 2011, that its most recent annual report was filed on January 11, 2011, and its status is actite. I further certify that said corporation has not filed Articles of Dissolution Gn— nndry trq hold -dlhr 6nwr.ti.•u(r f I7midn, al 71W.hassrr•. the Copiwt thin the lirrl/th dqr r fJameurr. 2011 Secretary of State �y� \uhrr i:n yr ll VMII'IN!IiW I�- 1111211- I'NNNIrNYNIN! •����,P� , Tn:r: A.m a. rYn. r.nrl.: ,'A.. ..ru. ih.. 11'.oflrh �GJ:. M.:u r. Jn� Llryn: ncfile.wnbb. urg/rrrlNUILlm.hanl PROOF OFA UTHORIZA TION TO TRANSACT BUSINESS IN THE STATE OF FLORIDA El Pourb of v R.J. Beh f 4� Wi - AM tYtitPPi`S any, Inc. Is authorized under the provisions of S�tp .��a Statutes, to offer engineering services to the public through a Professional Engin f °r, �l q ed under Chapter 471, Florida Statutes. Certificate of Authorization EXPI RATION: 2/28/2013 AUDIT NO: 228201300420 CA. Lic, No: 8365 R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 5 C I T Y OF S U N N Y I S L E S T R A F F 1 C E N G I N E E R I N G S E B E A C H R V I C E S PROFESSIONAL ENGINEERS LICENSES �n�r� �f ��e1lf�a €En1�i �ngillrers � �s,.I,1y1r Javier Rodriguez, P.E. 1S 1 mma As A PROFESSIONAL ENG 4EER LNOER CHA4,TCH 471, FLORIDA STATUTES ExrlRAnm 2jA2013 RE UC N4: AupT N(F 229241319333 46264 lit r �loaril 1r€ �r17f'rga'tn>s>aI�itrginrrrs AjA Robert har, P.E. 12 ILCP.NRQD AS A PHOP'"SIONAL ENGINEER UNDER CHAm" 471., FL9IIIDA STAWMS EXPIRATa)N: 212&2013 PL•" 110. Na. Auutr Nn: 22820!307031 2117" k -A tQ of ' tat:I�4 v Pourb of Professiunnl Wagineers P.f, fq,t Juan H. Vazquez, P.E. IS LICENSED AS A PROFESSIONAL ENGINEER UNDER CHAPTER 471, FLORIDA STATUTES EXPIRATION: 212812013 P.E. LIE. NO: AUDIT No: 228201308789 61143 s jx Of U Pnnrh of Professional gugineers rrn„1, tge David Mack Boyer, P.E. IS LICENSED AS A PROFESSIONAL ENGINEER UNDER CHAPTER 471, FLORIDA STATUTES EXPIRATION: 212812013 P.E. LIC. NO: AUDIT NO: 228201310008 43226 r�ill�Wnrt�itinn��l 'Uf�'�51D11�i1 �;crtifir7tinit �in�trl ihtG Ra fad i!•.7e fit: azuza PROFESSIONAL TRAFFIC OPERATIONS VA61NEER 0",��1 ) /Ia; 2�y" e, 41feeel 11, 4,11 /1' nVff'7/, Ik�XK.T4R.. I' lhelrV \.. tv>axe *' /� /•ie,u. x6irulr Cam' 'I'tnscil of PA Bi=4 Ilginrees � . Ood Rafa a, oxa, P.E. W LICENSED AS A FI- J'ESSICNAL EMANEER UNDER CHAPTER 471, FLOP" STATUTES EwftnoN:2t361FU13 F.E. UC. hb: AAM,T NO. 22MI SIJ632 24497 nxt�I ,If rAssilrghl "in inrrrls _e�Anh [W Carlos Manaev-azorra, P.E. 15 LICENSED AS A PR,7FESSI0k4L €NMEER UWER CtwvnR 471, FLoR1DA STATUTES, EMUTiON: 579=3 RE. LIC. ND: AUDrr N4 226101319447 4M3 R. I. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 6 C I T Y OF S U N N Y I S L E S T R A F F I C E N G I N E E R 1 N G S E af f 1636 of rlof"Sitind `'l11giltIm' s Anthony Va69 OwAlfred, P.E. 1$ LICENSED AS A PRC#MJDNDNAL ENG6NEER UkOER CkAr" 471, PLORIUA STATUTES E(P,W x+: 2i8 &7013 P.E LIC NO: Au- No 2212D13Dl18) 318!1 okv o 6 1; mot[ �oi:ra of 1�1ii11,r�� �ngirlr�rg 1 fill David Gustav 9pmano, P.E. IS UICENSED AS A PRDFEmoNAL ENGINEER UNDER CHAPTER A71, FLORIDA STATUrs £%P1RAnION: V2RIm13 P.E. LIc. No AUDfrNO 228181328412 63817 B E A C H R V I C E S et' PuttrD of 'Pusi01141 �nginms Sean Frai. ` ; eefe, P. E. IS LICENSED AS A PROFESSIONAL ENGINEER UNDER CHAPTER 471, FLORIDA STATUTES EXPIRATION: 212812013 P.E. UG. NO: AUDIT NO: 228201322337 41766 Please refer our Schedule of Proposed Services on the following page. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 7 Y =OF THE DISTRICT CF COLUMBA .p DEPARTM ENT OF CONSUMER AND REGULATORY AFFAIRS OCCUPATIONAL AND PROFESSIONAL LICENSING ADMINISTRATION 4 BOARD OF PROFESSIONAL ENGINEERS a Be it Fnrarn rhnl PAOLAA. RIVEROS N has mer n11 requirements prescribed by ka , and regulations and is h—'bp licensed—(n) Professional Engineer (CIVIL) in accord., -,,*h D. C. Lau . ??61, Second Oamibns Regdmary Reform Amemlmenr Aa f 1998. h„•in,ess.1e f,d,e.nWB— deansadddA lieense to be grinned and mtesled by the OJJiciaL -1 of the DiN(ieFOfCOfumbin. rhu 9th dro, of June. 2010. O£PARTAIE.NFO£ CO.%WIIER AND REGL'LITORF AFFJMS ,f Please refer our Schedule of Proposed Services on the following page. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 7 C I T Y OF S U N N Y I S L E S B E A C H T R A F F 1 C E N G I N E E R I N G S E R V I C E S r. A SCHEDULE OF PROPOSED SERVICES Our objective is to provide the City with high quality, timely professional services. We are committed to be an extension of your staff and to "tailor fit" our services to provide specifically what the City desires. Our project management philosophy is to be proactive. This simply means: to search out problems and solve them before they can happen. Our project manager will provide direction and be responsible to the City for the quality and timeliness of the work. Mr. Javier Rodriguez, P.E., as noted, has over 24 years of civil engineering experience in urban and rural roadway design projects. Working closely with the City, Mr. Rodriguez will provide an effective work plan that will match closely with that process employed by the City, tailored specifically for the project: a. STAFFING PLAN As outlined in our organizational chart, the project will identify the key personnel and their responsibilities as described in our staffing section. b. CLOSE COORDINATION Subject to the needs of the specific task order, close coordination will be provided on a weekly and monthly basis, using e -mail and other effective means as required for the specific tasks. C. INTERACTIVE TEAM MANAGEMENT APPROACH Our project approach will keep the City thoroughly informed of the project. The team approach is the cornerstone of RJ BEHAR'S method of doing business. d. IN -HOUSE "BRAINSTORMING SESSION" Once we obtain sufficient field data and have completed our field review, our project team will conduct a "brainstorming session ", where the key personnel gather to discuss the project and suggest an optimum solution for the project. The goal of is to get the decision makers involved early. e. USE OF INTERACTIVE APPROACH WITH THE CITY OF SUNNY ISLES BEACH TO ACCELERATE WORK The goal of the interactive approach proposed by our team is to get the decision makers involved in the project from the very start. Major design decisions will be coordinated with City's Staff through the City's Project Manager. This timely involvement allows our team to avoid false starts and eliminates significant design changes at the submittals. f. WEEKLY IN -HOUSE MEETINGS We hold weekly in -house staff meetings with detailed action items to track budgets and design activities. g. MONTHLY PROGRESS MEETINGS Our Project Manager will meet with the City's Project Manager on a monthly basis to review the project's progress. A monthly progress report will be prepared. Please refer our related Project Experience the following page. laR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 8 C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G I N E E R I N G S E R V 1 C E S NW 44TH STREET CITY OF LAUDERDALE LAKES, FL The scope of project consisted of the design of NW 44th Street Roadway Improvements from East of State Road 7 to the City limits within the City of Lauderdale Lakes. The project, which was approximately 0.32 miles long, involved the design of the undeveloped section of NW 44th Street into a 4 -lane roadway; connecting to the existing 4 -lane roadway in the City of Oakland Park. The services included roadway plans, design of 72" culvert, signing and marking plans and concrete block privacy walls. The project was nominated for a civil engineering award by the Florida Chapter of the Institute of Professional Engineers of Puerto Rico for its use of Context Sensitive Design Principles and received Third Place. CLIENT City of Lauderdale Lakes 4300 NW 36th Street Lauderdale Lakes, FL 33319 Mrs. Sonia Torres, PE, LEED AP City Engineer I Public Works and Engineering Services Tel: (954) 535- 2712/Fax: (954) 731 -5309 storres @lauderdalelakes.org RJ BEHAR'S ROLE Design, roadway plans, signing and marking plans, privacy walls, traffic projections and warrant analysis PROJECT STARTED: 2004 PROJECT COMPLETED: 2007 VALUE OF DESIGN SERVICES: $282,767.00 CONSTRUCTION COST: $1,922,215 RJ BEHAR's KEY PERSONNEL Robert J. Behar, PE - Principal in Charge Carlos Mazorra, PE - Project Manager Juan H. Vazquez, PE, PH, BCEE - Drainage Engineer ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 9 i C I T Y OF S U N N Y I S L E S T R A F F I C E N G I N E E R I N G S E B E A C H R V I C E S Of) SR- 5 /US -1 OVERSEAS HIGHWAY FROM FONTAINE DRIVE TO S. OF TAVERNIER CREEK BRIDGE - MONROE COUNTY, FL This project consists of 0.80 miles of 4 -lane divided, urban section of SR- 5 located in the Florida Keys. The scope of services included milling and resurfacing, signing and pavement markings, traffic control plans and ADA and pedestrian features upgrades. The project access management analysis resulted in the closure of several unnecessary driveways. Enhanced traffic signal signage was required due to a high rate of accidents at the corridor's one signalized intersection. Additionally the Typical Section was modified to accommodate bicycle lanes without widening. CLIENT Florida Department of Transportation, District 6 1000 N.W. 111 Street Miami, FL 33172 Mr. Danny Iglesias, PE Project Manager Tel: (305) 470- 5289/Fax: (305) 470 -6725 danny.iglesias @dot.state.fl.us RJ BEHAR's ROLE Milling, resurfacing, signing and pavement markings, traffic control plans, ADA and pedestrian upgrades. PROJECT STARTED: 03/4/2010 PROJECT COMPLETED: 08/2011 COST /FEES PAID: $287,382.00 CONSTRUCTION COST: $1,000,000.00 (Estimate) CHANGE ORDERS: None PROJECT LENGTH: 0.80 miles RJ BEHAR's KEY PERSONNEL Javier Rodriguez, PE - Project Manager Andrea Ramudo, ME, El, LEED AP - Project Engineer Rohan Punit, El - Project Engineer Hernando Segura - CAD Designer ElR.J.Behar R. I. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 10 C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G I N E E R I N G S E R V I C E S NW 7TH /9TH CONNECTOR FORT LAUDERDALE, FL The project includes the design of a 1.5 mile urban section, 4 -lane divided, connector between NW 7th and NW 9th Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing and pavement marking and permitting. The project also includes public involvement coordination. Re- evaluation of the contamination screening and evaluation report in accordance with FDOT /PD &E 23, CFR 771 was performed to identify significant environmental impacts, which may have changed after previous environmental reports. Conclusions and recommendations were also provided in order to continue to the next project phase. CLIENT City of Fort Lauderdale 101 NE 3rd Avenue, Suite 300 Fort Lauderdale, FL 33301 Ms. Mina Samadi, PE - Project Manager Tel: (954) 828 - 5018 /Fax: (954) 828 -4500 MSamadi @fortlauderdale.gov RJ BEHAR's ROLE Roadway design, signalization, drainage design, signing and pavement marking and permitting PROJECT STARTED: 2008 PROJECT COMPLETED: On -going COST/FEES PAID: $350,000 CONSTRUCTION COST: $3 -5 million (Not including the right -of -way) RJ BEHAR'S KEY PERSONNEL Robert J. Behar, PE - Principal in Charge Javier Rodriguez, PE - Project Manager Anthony V. Alfred, PE - Project Engineer Kelly L. Nowell, PE, LEED AP - Project Engineer Carmen A. Aponte, MSE, CEI - Environmental Engineer Marlin Scattolini - Project Engineer ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 11 C I T Y OF S U N N Y I S L E S T R A F F I C E N G I N E E R 1 N G S E B E A C H R V I C E So NW 87TH AVENUE (SR- 973 /GALLOWAY ROAD) FROM NW 74TH STREET TO NW 103RD STREET - MIAMI -DADS COUNTY, FL The scope of the project consists of final design for the reconstruction of a segment and new construction of NW 87th Avenue (SR- 973 /Galloway Road) from NW 74th Street to NW 103rd Street, within the Town of Medley, Florida. NW 87th Avenue is primarily a north -south urban arterial, Miami -Dade County owned roadway, with a design speed of 45 mph, The proposed improvements will provide a much needed north - south corridor along western Miami -Dade County. RJ Behar is responsible for the roadway design, traffic studies and operations, drainage design, signing and pavement markings and overall coordination. The scope of the project included a traffic study and development of several alternatives for the intersection of Okeechobee Road and NW 87th. The project also includes a new bridge over the Miami Canal. CLIENT Florida Department of Transportation, District 6 1000 NW 111th Street Miami, FL 33172 Ms. Ana Arvelo, PE - Project Manager Tel: (305) 470 - 5210 /Fax: (305) 470 -6725 ana.arvelo ()dot.state.fl.us RJ BEHAR'S ROLE Roadway /traffic control plan (TCP) design, pavement marking and signing, signalization, lighting, drainage /permitting, bridge construc- tion, utility coordination, traffic study, traffic counts, traffic projections and traffic warrants. PROJECT STARTED: 04 /28/2005 PROJECT COMPLETED: On -going COST/FEES PAID: $1,204,000 CONSTRUCTION COST: $12,300,000 (Estimate) PROJECT LENGTH: 1.90 miles RJ BEHAR'S KEY PERSONNEL Robert J. Behar, PE - Quality Assurance/ Officer in Charge Anthony V. Alfred, PE - Project Engineer Juan H. Vazquez, PE, PH, BCEE - Drainage Engineer Carlos Mazorra, PE - Signalization Plans Claudia M. Lamus, PE - Traffic Engineer Carmen A. Aponte, MCE, CEI — Drainage /BHR ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 12 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S SUNRISE LAKES BOULEVARD - RIGHT -OF -WAY IMPROVEMENTS CITY OF SUNRISE, FL The project consisted of 2.3 miles of rural section, 4 -lane divided streetscape with miscellaneous improvements. It included the addition of valley - gutter on the outside edges of pavement and reconstruction of median curb. The project included the construction of decorative concrete crosswalks with pavers in the median. It also included milling and resurfacing, signing and pavement markings with miscellaneous sidewalk reconstruction. CLIENT City of Sunrise Capital Projects 4747 Nob Hill Road, Suite 10 Sunrise, FL 33351 Mr. Alan Gavazzi, AIA Tel: (954) 572 -2487 agavazzi @cityofsunrise.org RJ BEHAR's ROLE Roadway improvements, milling and resurfacing, signing and pavement markings, miscellaneous sidewalk reconstruction, curb and valley - gutter installation and construction administration PROJECT STARTED: 2006 PROJECT COMPLETED: 2009 DESIGN CONTRACT DURATION: 6 Months COST/FEES PAID: $206,854 CONSTRUCTION COST: $2,400,000 CONSTRUCTION DURATION: 12 Months CHANGE ORDERS: None VALUE OF CHANGE ORDERS: NSA RJ BEHAR's KEY PERSONNEL Javier Rodriguez, PE - Project Manager Sonia M. Torres, PE, LEED AP - Project Engineer Hans Ribbeck, PE - Design Engineer Mariana Urdaneta - Designer Marlin Scattolini - Designer f �y j] R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 13 C I T Y OF S U N N Y I S L E S B E A C T R A F F 1 C E N G 1 N E E R 1 N G S E R V I C E S SR- 932/49TH STREET (NW 103RD STREET) FROM W. 2ND AVENUE TO E. 10TH AVENUE - HIALEAH, FL The scope of this project consisted of milling and resurfacing and ADA pedestrian ramp upgrades. The length of the project was 1.576 miles. RJ Behar was responsible for all of the roadway design, pavement marking and signing plans, lighting, drainage, utility coordination and permitting, CLIENT Florida Department of Transportation, District 6 1000 N.W. 111 Street Miami, FL 33172 Mr. Jose A. Barrera, PE - Project Manager Tel: (305) 470 - 5260 /Fax: (305) 470 -6725 jose.barrera @dot.state.fl.us RJ BEHAR's ROLE Roadway design plans, pavement marking & signing, lighting, drainage, utility coordination and permitting PROJECT STARTED: 11/2005 PROJECT COMPLETED: 10//2006 COST /FEES PAID: $154,248.09 CONSTRUCTION COST: $1,323,718 CONSTRUCTION COMPLETION DATE: 01/2008 RJ BEHAR'S KEY PERSONNEL Robert J. Behar, PE - Quality Assurance/ Officer in Charge Israel Magrisso, PE - Project Manager Juan H, Vazquez, PE, PH, BCEE - Drainage Engineer Carlos Mazorra, PE - Roadway /Highway Engineer ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 14 C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G I N E E R I N G S E R V I C E S RECONSTRUCTION OF SE 3RD STREET BELLE GLADE, FL in RJ Behar is the lead Designer and H & J Contracting, Inc. is the Design - Builder of SE 3rd Street between Martin Luther King, Jr. Boulevard and G Avenue, Belle Glade, Palm Beach County, Florida. This is a Design -Build contract. The scope of this project included roadway plans, drainage design, signing & marking plans and utility relocation plans. The design included the use of filter fabric and a thick sub -base in lieu of demucking the roadway. The project also included water and sewer plans to be constructed as part of the roadway improvements. The project included relocation of 1,640 feet of 8 inch water mains and installation of 1,312 feet of 8 inch wastewater lines including manholes and service connections. RJ Behar coordinated the design with the Palm Beach County Water Utilities Department and obtained permits from the Palm Beach County Fire Marshall and the Health Department. CLIENT Florida Department of Transportation, District 4 3400 W. Commercial Boulevard Fort Lauderdale, FL 33309 Ms. Leslie Wetherell, PE Tel: (954) 777- 4682IFax: (954) 777 -4482 leslie .wetherell @dot.state.fl.us RJ BEHAR'S ROLE: Lead designer for roadway design, engineering services, water and sewer plans, signing and marking plans, lighting plans, utility coordination and drafting PROJECT STARTED: 2009 PROJECT COMPLETED: 2010 COST/FEES PAID: $191,203 CONSTRUCTION COST: $1,100,000 RJ BEHAR's KEY PERSONNEL: Robert J. Behar, PE - Principal in Charge Sean O'Keefe, PE - Project Manager Nanette Akyaz - Designer Hernando Segura - Designer ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 15 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G 1 N E E R I N G S E R V I C E S SW 176TH STREET FROM SW 107TH AVENUE TO US -1 MIAMI -DADE COUNTY, FL The scope of the project included master planning and feasibility analysis for a new roadway, including evaluation of traffic signals vs. traffic circles. After the master planning was completed, then roadway design including drainage, signing & marking and lighting proceeded. RJ Behar also provided the coordination with utilities, permitting and public involvement with presentations to the Commissioners. CLIENT Miami -Dade County Public Works Department 111 N. W. 1St Street Miami, FL 33128 Ms. Priscilla Morales Tel: (305) 375 -4866 Pmorales @miamidade.gov R1 BEHAR's ROLE Master planning, feasibility analysis, and roadway design including drainage, signing & marking and lighting PROJECT STARTED: 2006 PROJECT COMPLETED: 2007 COST/FEES PAID: $211,131 CONSTRUCTION COST: $4,500,000 RJ BEHAR's KEY PERSONNEL Robert J. Behar, PE - Principal in Charge Israel Magrisso, PE - Project Manager Paola Riveros, El - Drainage Design ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 16 C I T Y OF S U N N Y I S L E S T R A F F I C E N G I N E E R 1 N G S E R B E A C H V 1 C E S E. 1ST AVENUE FROM OKEECHOBEE ROAD TO E. 21ST DESIGN STUDY CITY OF HIALEAH, FL The scope of this project included a traffic study, roadway plans, signalization plans, utility relocation plans, as well as the design and drafting of signing and marking plans and lighting plans including lighting calculations for the reconstruction of East 1St Avenue from a one -way to a two -way street in the City of Hialeah. CLIENT City of Hialeah 5601 East 8th Avenue Hialeah, FL 33011 Mr. Jorge E. Hernandez - Project Manager Tel (305) 687- 2656/Fax: (305) 687 -2632 jehernandez @hialeahfl.gov RJ BEHAR'S ROLE Roadway design engineering services, signalization, signing & marking plans, lighting plans, utility and drafting PROJECT STARTED: 03/15/2003 PROJECT COMPLETED: 04/15/2003 COST /FEES PAID: $7,500 CONSTRUCTION COST: $3,300,000 RJ BEHAR'S KEY PERSONNEL Robert J. Behar, PE - Principal in Charge Adriana Saboya - Designer Engineer 1 R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 17 C I T Y O F T R A F F I C S U N N Y I S L E S B E A C H E N G I N E E R I N G S E R V I C E S of", NORTH BAYSHORE DRIVE OPERATIONAL IMPROVEMENTS CITY OF MIAMI, FL The scope of this project consisted of milling and resurfacing North Bayshore Drive from NE 15th Street to NE 17th Terrace and provided a traffic circle to improve traffic operations at the intersection. It also included re- vising the existing median so that the roadway width could accommodate one 164 lane and one 84 parking lane to accommodate future bicycle lanes. RJ Behar provided the planning, alternatives analyses and design services for the project. CLIENT City of Miami Office of Capital Improvements 444 SW 2nd Avenue, 8th Floor Miami, FL 33130 Mr. Hector Badia, PE Tel: (305) 419 -1236 E -mail: hbadia @miamigov.com RJ BEHAR'S ROLE Master planning, roadway de- sign including drainage im- provements, signing and mark - ing and lighting design PROJECT STARTED: 2007 PROJECT COMPLETED: 2009 COST/FEES PAID: $102,300.00 CONSTRUCTION COST: $441,000 (Estimate) RJ BEHAR'S KEY PERSONNEL Robert J. Behar, PE - Principal in Charge Anthony V. Alfred, PE - Project Manager Juan H. Vazquez, PE, PH, BCEE - Drainage Engineer Marlin Scattolini - Designer (^= ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 18 �v, 4 (^= ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 18 C I T Y OF S U N N Y I S L E S T R A F F ] C E N G 1 N E E R 1 N G S E R B E A C H V 1 C E S I -75 GRIFFIN ROAD INTERCHANGE BROWARD COUNTY, FL The Florida Department of Transportation (FDOT) District 4 has determined that the 1 -75 /Griffin Road interchange should be "urbanized" in order to address the following primary issues: 1. Improve the dangerous weaving conflicts that occur between the traffic exiting southbound 1 -75 and westbound Griffin Road, seeking a north -bound right turn to Weston Road, 2. Improve the level of service for the Griffin Road /Dykes Road Intersection, and 3. Alleviate the high incidence of accidents. CLIENT Florida Department of Transportation, District 4 3400 W. Commercial Boulevard Fort Lauderdale, FL 33309 Mr. Julio C. Delgado, PE Consultant Project Management Tel: (954) 777 - 4390 /Fax: (954) 777 -4482 julio.delgado @dot.state.fl.us RJ BEHAR'S ROLE Roadway improvements, drainage, permitting, signing & pavement markings, signalization, lighting, landscaping, traffic analysis and bridge, structural PROJECT STARTED: 04/2007 PROJECT COMPLETED: 07/2010 COST /FEES PAID: $1,400,000 CONSTRUCTION COST: $11,000,000 RJ BEHAR'S KEY PERSONNEL Robert J, Behar, PE - Principal in Charge Sean F. O'Keefe, PE - Project Manager Claudia M. Lamus, PE - Traffic Modeling El' R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 19 C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G I N E E R I N G S E R V I C E S SR- 5 /US -1 RESURFACING BOCA RATON, FL State Road 5 /US -1 is an urban arterial facility running north /south within the Cities of Deerfield Beach and Boca Raton. Currently, it is used as a major transportation route for land traffic. The scope of this project consisted of milling and resurfacing the existing pavement; upgrading the signal pedestrian features to cur- rent ADA (American with Disabilities Act) standards, new signing and pavement markings with upgraded landscaping. CLIENT Florida Department of Transportation, District 4 3400 W. Commercial Boulevard Fort Lauderdale, FL 33309 Ms. Vanita Saini, PE Tel: (954) 777- 44680Fax: (954) 777 -4482 Vanita.saini @dot.state.fl.us RJ BEHAR'S ROLE Roadway plans, milling and resurfacing the Existing pavement, upgrading the signal pedestrian, utility coordination and permitting PROJECT STARTED: 01/2006 PROJECT COMPLETED: 01/2008 COST /FEES PAID: $350,000 CONSTRUCTION COST: $1,000,000 RJ BEHAR's KEY PERSONNEL Carlos Mazorra, PE - Project Manager Paola Riveros, El - Project Engineer Adriana Gonzalez, El - Project Engineer f R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 20 C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G 1 N E E R I N G S E R V I C E S NW 44TH STREET — IMPROVEMENTS CITY OF SUNRISE, FL The scope of this project consisted of the enhancement of an existing swale conveyance system as well as improvements to the existing streetscape with the addition of a sidewalk feature along the project limits. Project activities included the development of a typical section analysis to determine the most feasible alternative as well as the development of construction documents and permitting. A drainage analysis was also performed for the design of the outfall structure that connects to a local canal. CLIENT City of Sunrise Capital Projects 4747 N. Nob Hill Road, Suite # 10 & 11 Sunrise, FL 33351 Mr. John Cowling, PE — Project Manager Tel: (954) 572- 2486/Fax: (954) 572 -2494 jcowling @cityofsunrise.org RJ BEHAR'S ROLE Drainage and roadway improvements PROJECT STARTED: 2007 PROJECT COMPLETED: 2009 COST/FEES PAID: $40,000 CONSTRUCTION COST: $350,000 Estimated RJ BEHAR'S KEY PERSONNEL Javier Rodriguez, PE - Project Manager Anthony V. Alfred, PE - Project Engineer Claudia M. Lamus, PE - Project Engineer LIMIT 45 ElR.J.Behar R. I. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 21 C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G I N E E R I N G S E R V I C E S EAST 4TH AVENUE STREET ASSESSMENT CITY OF HIALEAH, FL RJ Behar was under a continuous contract with the City of Hialeah to provide General Engineering Services for the East 4th Avenue assessment of sidewalks, ADA compliance and cost estimate for repairs or reconstruction of sidewalks of two segments of this roadway; from Hialeah Drive to East 21St Street (1.25 mile segment) and from East 32nd Street to East 53rd Street (1.33 mile segment). As part of these services, RJ Behar also provided drainage, pedestrian safety and conflict with motorists, aesthetics (intersection configuration), parking configuration and compliance of site along the road and bus stops (utility poles). CLIENT City of Hialeah 5601 East 8th Avenue Hialeah, FL 33011 Mr. Jorge E. Hernandez - Project Manager Tel (305) 687- 2656/Fax:(305) 687 -2632 jehernandez @hialeahfl.gov RJ BEHAR'S ROLE RJ Behar provided engineering design services for roadway resurfacing, drainage, signing and marking and lighting plans PROJECT STARTED: 08/2006 PROJECT COMPLETED: 10/2006 COST /FEES PAID: $22,450 CONSTRUCTION COST: Unknown RJ BEHAR's KEY PERSONNEL Robert J. Behar, PE - Principal in Charge Emilio E. Orozco - Project Manager Nanette Akyaz - Project Engineer SIDEWALKS - HC RAMPS - DRIVEWAYS UWAINMUL — 11ILL13 — wR6 &GUTTERS — PAVEMENT CONFIGURATION OF INTERSECTIONS AND SITES /PEDESTRIAN SAFETY E] R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 22 C I T Y OF S U N N Y I S L E S T R A F F I C E N G I N E E R I N G S E R B E A C H V I C E S E. 1ST AVENUE TO E. 2ND AVENUE BETWEEN E. 10TH & E. 15TH STREET DESIGN STUDY - CITY of HIALEAH, FL The scope of this project included a traffic study, roadway plans, signalization plans and utility relocation plans. The design and drafting of signing and marking plans and lighting plans included lighting calculations for the reconstruction of East 1St Avenue from a one -way street to a two -way street in the City of Hialeah. The project also included neighborhood street improvements, new pavement, drainage and new sidewalks. CLIENT City of Hialeah 5601 East 8th Avenue Hialeah, FL 33011 Mr, Jorge E. Hernandez - Project Manager Tel: (305) 687- 2656/Fax: (305) 687 -2632 jehernandez @hialeahfl,gov RJ BEHAR'S ROLE Roadway design engineering services, signalization, signing & marking plans, lighting plans, utility, and drafting i PROJECT STARTED: 03/15/2003 PROJECT COMPLETED: 04/15/2003 COST /FEES PAID: $7,500 CONSTRUCTION COST: $3,300,000 RJ BEHAR's KEY PERSONNEL Robert J. Behar, PE - Principal in Charge Adriana Saboya - Designer Engineer ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 23 C I T Y OF S U N N Y I S L E S B E A C T R A F F 1 C E N G I N E E R I N G S E R V I C E S PALM AVENUE (FROM WEST 45TH STREET TO WEST 49TH STREET) CITY OF HIALEAH, FL The scope of this project consisted of roadway improvements, milling and resurfacing, drainage, signing and pavement markings and lighting plans on Palm Avenue from West 45th Street to West 47th Street and from West 46th Street to West 49th Street in the City of Hialeah. This project is part of the American Recovery and Reinvestment Act (ARRA), which is supported by federal funds. The challenge of this project was to prepare roadway plans which would improve the roadway corridor while minimizing federal funds the City would have to use, The major construction items included milling and resurfacing, signing and marking, utility coordination and permitting with the FDOT. Site visits were made to locate portions of curb and gutter and which sidewalks needed to be replaced, Meeting ADA criteria was also a goal of the project CLIENT City of Hialeah 5601 East 8th Avenue Hialeah, FL 33011 Mr. Jorge E. Hernandez - Project Manager Tel (305) 687- 2656/Fax: (305) 687 -2632 jehernandez @hialeahfl.gov RJ BEHAR'S ROLE Roadway improvements, milling and resurfacing, drainage, signing and pavement markings, utility coordination, permitting as well as lighting plans PROJECT STARTED: 03 /11/2009 PROJECT COMPLETED: 06/30/2009 COST /FEES PAID: $50, 000 CONSTRUCTION COST: Unknown RJ BEHAR'S KEY PERSONNEL Robert J. Behar, PE - Principal in Charge /Project Manager Nannette Akyaz - Roadway Designer Claudia M. Lamus, PE - Project Engineer Rohan Punit, El - Project Engineer Mariana Urdaneta - CAD Technician �u _r W_ LA.. E] R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 24 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S - O SR- 806 /ATLANTIC AVENUE CITY OF DELRAY BEACH, FL The scope of this project consisted of the complete design of resurfacing 2.8 miles of a major arterial road- way, including drainage improvements, pavement marking and signing, lighting plans, eight signal locations, a public involvement program and landscape improvements. CLIENT Florida Department of Transportation, District 4 3400 W. Commercial Boulevard Fort Lauderdale, FL 33309 Mr. John Thompson, PE a "� V' _ Tel: (954) 777 - 4680 /Fax: (954) 777 - 4482; f ry !t John.thompson @dot.state.fl.us v ;; n. :w RJ BEHAR S ROLE,�� Roadway, including drainage improvements, s pavement marking and signing, lighting plans, ; .,trl` r--,� ,; �, •. eight signal locations, a public involvement program and landscape improvements.'` PROJECT STARTED: 2005 PROJECT COMPLETED: 2008 COST /FEES PAID: $ 853,060 CONSTRUCTION COST: $7,500,000 (Estimate) RJ BEHAR'S KEY PERSONNEL Robert J. Behar, PE -QA /Officer in Charge Carlos Mazorra, PE - Project Manager Juan H. Vazquez, PE, PH, BCEE - Drainage Engineer Maikel Gonzalez, PE - Roadway Design Engineer ElR.J.Behar R. I. BEHAR & COMPANY, INC. I RFQ N0. 11 -11 -01 1 25 U z U E- J O < E- o CO w _ � p Q < W U � O O J ¢ w O Q o z w z _ < Ol z W ¢ CL w a U w z m w _ w U m 0 r z O O _ W W W d < C' W Q v7 W O Wfl� w < LL ^ W w � z U Q z o o CO w ,N 0 o a'S U N Of w \ O L U ou < << z w Q �_ ° o, < z ,^ W p > ~ m �J 1 p "i = C/) p o w J Q Z W �� W < < =D m fY ¢ N w U- < vi z z O O LLJ cc F- O m V Q� z w 05� O ^ W J O w > F- E- ¢ w z -- U — w a a < z N a w E^ w a- w Z w < a � w Z W W 1- Q co _ Cz U` > z ¢¢ o N � W r R W � O ° W F- z w l7 < O W Lli Q z cn w z W w r- w w z c� z �< < z Q o o Q< w o Vl V1 z a< z m m cn L U 2a a 2 ¢ Q < C/) Q U LL. w V a _ v W w W W O N Q O V LIJ ::D p C fO c C? a w W Q� \ N z n J _ E- ¢ d > o w < O a u = W W I— O w 06 `n z Q J L z Q Y Q ? Q O W O RS p z Z W Z z c m IAN x Z O =) S O J < z a On L7 _ < Z W C CCQ C = W U Q < < -- W ��1 z Q C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S :i► /, h JAVIER RODRIGUEZ, PE PROJECT MANAGER EDUCATION: B. S. Civil Engineering, Florida, International University, 1987 PROFESSIONAL REGISTRATIONS: P. E. Florida License No. 48264/1994 TRAINING /CERTIFICATIONS: Advanced Work Zone Traffic Control Training 2007; APWA — NPDES Requirements & Understanding Stormwater Collection System 2010; Roadside Design Course, October 2002; Stream Stability and Scour at Highway Bridges YEARS OF EXPERIENCE: 24 Years YEARS WITH RJ BEHAR: 2004 —Present ENGINEERING EXPERIENCE Mr. Rodriguez has extensive experience in urban and rural roadway design, including geometry, drainage, quantity computation and construction cost estimating. His expertise includes project scheduling and administration. He has served as design engineer, drainage engineer and permit coordinator as well as project manager. At RJ Behar, Mr. Rodriguez is the Director of Civil Engineering and oversees all aspects of design and construction document preparation. He has more than 24 years of experience. RELEVANT EXPERIENCE SR- 5 /US -1 /OVERSEAS HIGHWAY FROM FONTAINE DRIVE TO S. OF TAVERNIER CREEK BRIDGE, MONROE COUNTY, FL — FDOT, DISTRICT 6 Project Manager — The scope of services includes milling and resurfacing, signing and pavement markings, traffic control plans and ADA and pedestrian features upgrades. The project access management analysis resulted in the closure of several unnecessary driveways. Enhanced traffic signal signage was required due to a high rate of accidents at the corridor's one signalized intersection. Additionally the Typical Section was modified to accommodate bicycle lanes without widening. NW 7th/gth AVENUE CONNECTOR (DESIGN) — CITY OF FORT LAUDERDALE, FL Project Manager. The project includes the roadway design of a 1.5 mile urban section, 4 -lane divided, connector between NW 71h and NW 91h Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing pavement marking and permitting as well as public involvement coordination. NW 87th AVENUE (SR -973) TRAFFIC STUDY— FDOT, DISTRICT 6 Engineer of Record — The cope included a traffic study including traffic counts to determine the optimal geometrics, traffic operations and signal warrants for 8 intersections. The scope of this project consists of final design and future new reconstruction, roadway design, traffic operations, drainage, structure and construction of NW 87th Avenue (from NW 74th Street to NW 103rd Street) within the Town of Medley. SR -7 /US -441 ROADWAY LIGHTING AND NW 111h PLACE PEDESTRIAN LIGHTING IMPROVEMENTS, CITY OF LAUDERHILL, FLORIDA — FDOT, DISTRICT 4 LAP PROJECT Project Manager — Responsible for the design, quality assurance reviews of the plans, permitting and coordination with respective agencies. The scope of this project includes milling and resurfacing, installation of decorative stamped concrete and asphalt, lighting, landscaping, and street furniture. This is a FDOT Local Agency Program (LAP) Project. Project length: 0.45 miles SR -80 (SOUTHERN BOULEVARD) — FDOT, DISTRICT 4 Project Manager — Responsible for all aspects of design and plans production for the design of an urban freeway incorporating a Grade Separation Interchange with elements of a Single Point Urban Interchange (SPUI). The project included roadway design, signing and pavement markings, signalization, lighting, utility relocation, landscaping and irrigation design. SAMPLE ROAD MILLING & RESURFACING — FDOT, DISTRICT 4 Project Manager — The scope was for over 2 miles of urban section resurfacing including lighting, signalization, signing and pavement marking, access management and landscaping. OLIVE AVENUE STREETSCAPE — FDOT, DISTRICT 4 Project Manager /Engineer of Record — This project involved traffic calming, landscaping, signalization and drainage improvements. The project also involved the replacement of water and sewer lines. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 12 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S ; SUNRISE BOULEVARD AND 161h AVENUE — FDOT, DISTRICT 4 Project Engineer — This was an FDOT mini - contract and he produced complete roadway plans. US -1 BUS WAY PHASE II — FDOT, DISTRICT 6 Engineer of Record — The scope was for the final design of an 11 mile busway corridor in South Miami -Dade County. The scope included the necessary environmental document, final design, construction documents, traffic study, heavy signalization design and extensive maintenance of traffic design. Estimated Construction Cost $18,000,000. SUNRISE LAKES BOULEVARD IMPROVEMENTS — CITY OF SUNRISE, FL Engineer of Record for the improvement of 2.3 miles of an urban collector. The improvements included the addition of "Valley Gutter" on the outside edges of pavement and the reconstruction of the median. It also included milling and resurfacing the entire 2.3 miles, installation of new pavement markings and signage and aesthetic treatments at three intersections. EPD (ENVIRONMENTAL PROTECTION DEPARTMENT) LABORATORY GREEN BUILDING — BROWARD COUNTY ENGINEERING Project Manager. The scope of this project included drainage design, signage, permitting and utility coordination. SR -836 AUXILIARY LANES, MIAMI -DADE COUNTY, FL — MDX (EAC CONSULTING, INC.) Project Manager — The scope includes widening and construction of auxiliary lanes on SR -836 at NW 571h Avenue. RJ Behar is reviewing and approving final design plans. NW 141h STREET /SR -836 OFF RAMP, MIAMI -DADE COUNTY, FL — MDX (EAC CONSULTING, INC.) Project Manager — The scope includes the addition of an exclusive right turn lane off the SR -836 ramp and NW 14th Street. RJ Behar is reviewing all the design deliverables and supervising the design firm during the design phase. TOWN ENGINEER — TOWN OF SOUTHWEST RANCHES, FL As Town Engineer, responsibilities include review of all building permits, fill permits, develop cost estimates for the Town's capital improvement budget and represent the Town on all engineer matters. SR 7 /SUNRISE BOULEVARD CONSTRUCTION INSPECTION — CITY OF LAUDERHILL, FL Project Manager for the Construction Engineering Inspection Services for this intersection improvement project in the City of Lauderhill. This project involved the widening and reconstruction of this major urban arterial intersection and was accomplished through an agreement between the FDOT and the City. It included extensive utility coordination, resulting from the widening of SR -7, drainage improvements, signalization and lighting. SISTRUNK BOULEVARD (FROM FEDERAL HIGHWAY TO 27th AVENUE) — CITY OF FORT LAUDERDALE, FL Project Manager for this project for the City of Fort Lauderdale C.R.A., which involved streetscape, traffic calming and extensive public involvement, water line replacement. NW 44th STREET IMPROVEMENTS — CITY OF SUNRISE, FL Project Manager /Engineer of Record — Project activities included the development of a typical section analysis to determine the most feasible alternative as well as the development of construction documents and permitting. A drainage analysis was also performed for the design of the outfall structure that connects to a local canal. The scope of this project consisted of the enhancement of an existing swale conveyance system as well as improvements to the existing streetscape with the addition of a sidewalk feature along the project limits. Project length: 1.90 miles BATTERSEA AND DOUGLAS DRAINAGE IMPROVEMENT — CITY OF MIAMI, FL Drainage Engineer for the drainage improvements for a residential street intersection. This project involved producing an alternative analysis, construction plans and permitting for relieving flooding at this intersection as well as permitting for the improvements. MIRACLE MILE MEDIAN AND SIGNAL IMPROVEMENTS — CITY OF CORAL GABLES, FL Project Manager for the design and coordination of converting Miracle Mile from a 6 -lane undivided to a 4 -lane divided section. The project includes exclusive left turn lanes, sidewalk improvements and replacement of all signals. CITYWIDE RESURFACING INSPECTION — CITY OF CORAL SPRINGS, FL Project Manager— He supervised the inspection on 15 miles of street resurfacing. FLEET MAINTENANCE FACILITY — MIAMI -DADE COUNTY, FL Project Manager — He was responsible for preparing the civil engineering and structural plans for the Fleet Maintenance Facility. Services included contract document, permits, and utility coordination. SEVEN ISLES ENTRY BEAUTIFICATION — CITY OF FORT LAUDERDALE, FL Project Manager — The project consisted of improvements to the Seven Isles Entryway. These improvements included adding a parking space on the west side of SE 23rd Avenue as well as beautifying two of the existing bridges. 1] R.j.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 3 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R 1 N G S E R V I C E S ROBERT J. BEHAR, PE PRINCIPAL IN CHARGE <j EDUCATION: M.E. Civil Engineering, University of Florida, 1975; B.S. Civil Engineering, University of Florida, 1974 PROFESSIONAL REGISTRATIONS: P.E. Florida No. 21755/1980 YEARS OF EXPERIENCE: 35 Years YEARS WITH RJ BEHAR: 1999 —Present ENGINEERING EXPERIENCE Mr. Behar has worked on numerous design /build and roadway projects throughout his career. He began his engineering career in 1977 with the Florida Department of Transportation, and has over 34 years of experience in the planning, design and management of transportation projects nationwide. He has worked on projects for many municipalities throughout South Florida. He has been a very active member of various engineering societies. RELEVANT EXPERIENCE POWERLINE ROAD (SR -845) — FDOT, DISTRICT 4 Principal in Charge - The scope of the project consisted of complete design of widening and resurfacing three miles of a major arterial roadway, including drainage design, pavement marking and signing, overhead signing plans, lighting plans, seven signal locations, major culvert (72 -inch) replacement, structural plans (bridge widening) and deck replacement, public involvement program and landscape improvements. The project installed 8 major signalized intersections with galvanized mast arms. Signal analysis and new signal timings were developed using the Synchro model. Left turn storage was added to the intersections, either with added lane storage or by providing dual left turn lanes. Additional studies involving access management and pedestrian improvements improved traffic operations and corridor safety. SR -A1A RESURFACING PROJECT, PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 Principal in Charge — The project consisted of roadway improvements along AIA from Boynton Beach Inlet Bridge to Lake Worth Road. The project included a major drainage study and improvements, milling and resurfacing, bridges, signal improvements, signing and marking plans. This project required coordination with endangered species and seagrass surveys, preservation of two historical properties, and coordination of impacts to 4F (Boynton Beach Inlet park) properties. A coastal construction line was obtained, as well as an agreement with the Fish and Wildlife Commission, for the safety of any impact to sea turtles, from the proposed lighting design. Prepared maintenance of traffic plans. W. 291h STREET 3R SAFETY REVIEW (FROM OKEECHOBEE ROAD TO W. 4th AVENUE) — CITY OF HIALEAH, FL Project Manager /Principal in Charge — The scope of services consisted of a 3R Safety Review, which included crash data analysis and field observations to provide a report with recommendations to minimize the frequency of accidents. 1 -75 /GRIFFIN ROAD INTERCHANGE, BROWARD COUNTY, FL — FDOT, DISTRICT 4 Principal in Charge — The scope involved a traffic study to convert the existing rural interchange to a modified urban interchange. Services included all the traffic modeling and the preparation of an Interchange Operation Analysis Report. SR- 932/W. 49th STREET (NW 103,4 STREET FROM W. 2nd AVENUE TO E. 10th AVENUE), MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6 Quality Assurance Officer in Charge — The scope included milling and resurfacing with ADA pedestrian ramp upgrades. RJ Behar produced all the roadway design plans, pavement marking and signing, lighting, drainage, utility coordination and permitting. NW 87th AVENUE (SR- 973 /GALLOWAY ROAD), MIAMI -DADE COUNTY, FL— FDOT, DISTRICT 6 Principal in charge of the entire project — The scope included final design and future new reconstruction, roadway design, traffic operations, drainage, structure and construction. ATLANTIC AVENUE (SR -806) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 Principal in Charge for the resurfacing (RRR) of a 3 mile section from Via Flora to Congress Avenue. SR -9 /SW 27th AVENUE (FROM US -1 TO SW 8th STREET), MIAMI -DADE COUNTY, FL— FDOT, DISTRICT 6 Principal in Charge — The scope included construction drawings for 2 miles of major arterial roadway. The construction included milling and resurfacing the existing road, implementing drainage improvements and median opening improvements. ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 4 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S SR- 94 /KENDALL DRIVE, MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6 Supervised the resurfacing /widening of urban roadway, converting from a four -lane section to an eight - lane urban section. The project limits were from the Turnpike to SW 132nd Avenue. DESIGN /BUILD P3 FOR 1.595 FINAL DESIGN, BROWARD COUNTY, FL — FDOT, DISTRICT 4 (AECOM /DRAGADOS) Principal in Charge - The Interstate -595 (1 -595) corridor, between the 1- 75 /Sawgrass Expressway Interchange to just east of the 1- 595/1 -95 Interchange, is proposed for improvement. The corridor improvements will consist of a minimum of three general use lanes in each direction for the mainline of 1 -595, the construction of three reversible lanes in the center of the corridor and upgrades to SR -84, which parallels 1 -595 on the outside. The corridor has been divided into eight construction zones. RJ Behar is responsible for the design of all the corridor signals and temporary signals, and for lighting plans from West of Flaming Road to East of Hiatus Road, Zones 2 and 3 (approximately 2 miles). RJ Behar is also responsible for the overall drainage master plan update for the entire corridor, which includes exfiltration trenches, both wet and dry stormwater management systems and complete drainage design analysis for seven out of eight design zones. The Firm is also responsible for the drainage plan preparation for two roadway design sections as well as all coordination between six different design firms. PINES BOULEVARD (SR -820) AND 1 -75 (SR -93) INTERCHANGE CEI, CITY OF PEMBROKE PINES, FL — FDOT, DISTRICT 4 Principal in Charge — He was in charge of this ($11.2 million) Local Agency Program project between the City of Pembroke Pines and the FDOT, District 4. This was a federally funded project consisting of urbanized improvements at the 1 -75 (SR -93) and Pines Boulevard (SR -820) Interchange. The project included modifying the existing interstate overpass, entrance and exit ramps from a rural configuration to an urban configuration, as well as widening, signalization, landscaping and access management improvements along Pines Boulevard. "No- excuse Bonus" (250K) and "Incentive /Disincentive" contracting method utilized. PALM AVENUE FINAL DESIGN (FROM OKEECHOBEE ROAD TO 21s' STREET) — CITY OF HIALEAH, FL Project Manager /Engineer of Record — The project included streetscape roadway plans, marking and signing plans, roundabout design, and signalization plans for 6 intersections. The project consisted of converting Palm Avenue from a one -way to a two -way street. NW 71h /9th AVENUE CONNECTOR (DESIGN) — CITY OF FORT LAUDERDALE, FL Principal in Charge — The project includes the roadway design of a 1.5 mile urban section, 4 -lane divided, connector between NW 7th and NW 911 Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing pavement marking and permitting as well as public involvement coordination. NW 441h STREET — CITY OF LAUDERDALE LAKES, FL Project Manager — The project included the design and construction management of new construction for approximately 0.5 mile. The scope of services included drainage plans, marking and signing plans and lighting plans. ANDREWS AVENUE IMPROVEMENT — FDOT, DISTRICT 4 Project Manager for the new construction of Andrews Avenue from Atlantic Boulevard to NW 151h Avenue Project included roadway design, signal plans, signing and marking, lighting, bridge plans, and traffic studies SOUTHERN BOULEVARD (SR -80) IMPROVEMENTS — FDOT, DISTRICT 4 Project Manager /Principal in Charge — The scope was for the design and preparation of construction documents for the reconstruction of a 2.5 mile urban roadway, including a major urban interchange, in West Palm Beach, Florida. SR- 5 /US -1 RESURFACING (BOCA RATON, FL) — FDOT, DISTRICT 4 Principal in Charge — The project involved for milling and resurfacing (RRR) of 1.4 miles of a major collector. US -1 /FEDERAL HIGHWAY (FORT LAUDERDALE, FL) — FDOT, DISTRICT 4 Principal in Charge of the median revisions and resurfacing of 1.5 miles, including marking and signing, were completed from SR -84 to the New River Tunnel. SR- 25 /OKEECHOBEE ROAD AT NW 95th STREET — FDOT, DISTRICT 6 Principal in Charge for this intersection improvement project, including roadway plans, signing and marking and signalization plans. SR- 25 /OKEECHOBEE AT NW 116th WAY — FDOT, DISTRICT 6 Principal in Charge — The scope of this project included intersection improvements and widenings. US -1 (FEDERAL HIGHWAY) HALLANDALE BEACH, FL — FDOT, DISTRICT 4 This project went from Ives Dairy Road to Hallandale Beach Boulevard and included design of a 1.5 mile, six -lane urban divided highway. This project included design of over 20 stormwater injection wells. ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 S C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S JUAN H. VAZQUEZ, PE, PH, BCEE QA1QC OFFICERIQC REVIEWS EDUCATION: B.S. Civil Engineering, University of Puerto Rico, 1985 PROFESSIONAL REGISTRATIONS: P. E. Florida License No. 48264/1994 TRAINING /CERTIFICATIONS: P.E. Florida License, No. 51143/1996, Professional Hydrologist License No. 05 -H- 1653- 2006, Board Certified Environmental Engineer 07- 20009/2007 YEARS OF EXPERIENCE: 26 Years YEARS WITH RJ BEHAR: 2000 —Present ENGINEERING EXPERIENCE Mr. Vazquez has more than 26 years of civil engineering experience including the preparation of stormwater master plans, drainage studies, street improvements, designed highways, interchanges, intersections, both urban and rural, prepared pavement designs, transportation studies, hydrologic- hydraulic (H -H) and scour studies, utility relocations, etc. He recently managed a general engineering services contract with the South Florida Water Management District. In the Federal Aid assignment he was assigned several interstate projects for review of PD &E's, environmental documents and construction operations. He was also assigned to several statewide reviews, final inspection of railway crossings, and others. Mr. Vazquez is a professional hydrologist (PH) and a Board Certified Environmental Engineer (BCEE) in the specialty of water supply and wastewater. RELEVANT EXPERIENCE SEABOARD MARINE CARGO TERMINAL REDEVELOPMENT PHASE III, PORT OF MIAMI, FL Principal in Charge — He provided quality control and project management services for drainage design for the redevelopment of the Seaboard terminal of the Port of Miami. DESIGN /BUILD FOR 1.595 FINAL DESIGN, BROWARD COUNTY, FL — FDOT, DISTRICT 4 (AECOM /DRAGADOS) Task Manager responsible for the overall drainage master plan update and complete drainage design for the entire corridor, which includes exfiltration trench, storm sewer design and analysis, cross drain analysis, and both wet and dry retention stormwater management designs for seven out of eight design zones. He is also responsible for the drainage plan preparation for two roadway design sections, as well as all coordination between six design firms. DRAINAGE PERMIT COORDINATOR— FDOT, DISTRICT 6 Project Manager for review of drainage projects and coordination of permit requirements. US- 1 /SR -5 MIAMI -DADE COUNTY LINE TO HALLANDALE BEACH — FDOT, DISTRICT 4 Drainage Engineer in charge of drainage modification, and quality control. SR- 836/SR -826 (SECTION 5) PLANS REVIEW — MDX (EAC CONSULTING, INC.) Reviewed the Maintenance of Traffic Master Plan and provided comments. SR -A1A RESURFACING PROJECT, PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 Project Manager for roadway improvements along AIA from Boynton Beach Inlet Bridge, to Lake Worth Road. The project included major drainage study and improvements, milling and resurfacing, bridges, signal improvements, signing and marking plans and coordination with endangered species and seagrass surveys, preservation of two historical properties, and coordination of impacts to 4F (Boynton Beach Inlet Park) properties DISTRICT ENGINEERS PERMIT REVIEWS — CENTRAL BROWARD WATER CONTROL DISTRICT Technical Support — Provided hydrologic - hydraulic expertise and reviewed technical issues regarding proposed projects. DESIGN /BUILD FOR THE RECONSTRUCTION OF SE 3rd STREET, BELLE GLADE, FL — FDOT, DISTRICT 4 Drainage Engineer — The scope included the reconstruction of SE 3rd Street between Martin Luther King, Jr. Boulevard and G Avenue project. He was responsible for designing the entire drainage system, with French drains, new outfall, control structures and prepared the drainage report and permitting packages. NORTH ANDREWS GARDENS NEIGHBORHOOD IMPROVEMENT PROJECT, BROWARD COUNTY OFFICE OF ENVIRONMENTAL SERVICES Engineer of Record — He performed drainage calculations for the FDOT drainage connection permit. CM @ RISK FOR PARKER AND ATLANTIC BRIDGES REHABILITATION, BROWARD COUNTY, FL — FDOT DISTRICT 4 Project Manager for environmental permitting, MOT plans and utility coordination. ElR.j.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 6 C I T Y OF S U N N Y I S L E S B E A C H T R A F F 1 C E N G I N E E R I N G S E R V 1 C E S NW 87th AVENUE (SR-973/GALLOWAY ROAD) MIAMI -DADE COUNTY, FL - FDOT, DISTRICT 6 Engineer of Record - He was responsible for the drainage plans and preparation of the Bridge Hydraulic Report. PALM AVENUE - CITY OF HIALEAH, FL Engineer of Record, for drainage design - He finalized permitting, quality control reviews, and specifications, including specialty items, such as street clocks. NW 44th STREET - CITY OF LAUDERDALE LAKES, FL Engineer of Record for drainage and permitting. MIAMI RIVER GREENWAYS, SEGMENT D - CITY OF MIAMI, FL Drainage Engineer- Designed the system of French drains in conjunction with injection wells, to handle runoff. BATTERSEA AND DOUGLAS ROAD DRAINAGE IMPROVEMENTS - CITY OF MIAMI, FL Drainage Engineer - Designed alternatives, and drainage improvements for the City streets. NEIGHBORHOOD IMPROVEMENT PROJECTS, LA GORCE, WEST AVENUE AND NAUTILUS - CITY OF MIAMI BEACH, FL Engineer of Record - He designed the drainage improvements for three City neighborhoods and drew up plans for the construction and specifications of three stormwater pump stations with dual pumps telemetric systems, floats, and valve boxes. NW 5th STREET BRIDGE REPLACEMENT, MIAMI, FL- FDOT, DISTRICT 6 Project Manager and Drainage Engineer for drainage and Bridge Hydraulic Reports. This project included major utility coordination and large offsite discharging areas throughout the project. ANSIN BOULEVARD, DRAINAGE IMPROVEMENTS - CITY OF HALLANDALE BEACH, FL Project Manager - The scope involved the improvement of the drainage systems and street reconstruction in the industrial area of Ansin Boulevard. AREA WEST OF US 1 DRAINAGE STUDY - CITY OF HALLANDALE BEACH, FL Drainage Engineer - He prepared a master drainage study to develop alternatives to resolve and mitigate flooding problems. NE 32nd/33rd AVENUE, NE 17th AVENUE - CITY OF FORT LAUDERDALE, FL Drainage Engineer - He was responsible for the development and improvement to the drainage system and in charge of reviewing reports and calculations. US -1 EXCLUSIVE BUS LANES - MIAMI -DADE COUNTY, FL Drainage Engineer - Performed the Bridge Hydraulic and Scour analyses for three South Florida Water Management District (SFWMD) canal crossings. Supervised and implemented the drainage system design. KROME AVENUE, BRIDGE HYDRAULIC REPORT (BHR) MIAMI -DADE COUNTY, FL- FDOT, DISTRICT 6 Engineer of Record - Responsible for the preparation of a hydraulic report for Krome Avenue Bridge. SR -874 DRAINAGE MASTER PLAN TA 874 -04 - MIAMI DADE EXPRESSWAY AUTHORITY Senior Drainage Engineer - Responsible for the development of existing condition drainage maps for SR 874 Drainage Master Plan. He led the stormwater model development, utilizing stormwater master planning and modeling drainage software (AdICPR). HOLLYWOOD BOULEVARD (SR -820) FROM SR -A1A TO US -1 (3R) - FDOT, DISTRICT 4 Drainage Engineer - Drainage design for a resurfacing, restoration & rehabilitation (3R) project with widening, which affected all existing drainage. A separate study was conducted, to study alternatives for the resolution of flooding problems. US- 11SR -5 HOLLYWOOD BOULEVARD TO SHERIDAN STREET - FDOT, DISTRICT 4 Drainage Engineer - Task manager to evaluate required drainage improvements under a resurfacing, restoration and rehabilitation (3R) project. SW 2nd AVENUE - CITY OF FORT LAUDERDALE, FL Drainage Engineer - He performed a review of the existing drainage system and proposed alternatives for improvements. A report of the findings was completed and discussed with the City's staff. CANAL J CULVERT - CITY OF CORAL SPRINGS, FL Drainage Engineer who designed, permitted, and prepared plans for the construction of a 700 foot canal culvert. He was also the project manager for the construction services of this assignment. ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 7 C I T Y OF S U N N Y I S L E S B E A C H T R A F F 1 C E N G 1 N E E R I N G S E R V I C E S CARLOS MAZORRA, PE SIGNING, PAVEMENT MARKING & CHANNELIZATION EDUCATION: B.S. Civil Engineering, University of Miami, December 1983 PROFESSIONAL REGISTRATIONS: P.E. Florida No. 42653, 1990 TRAINING /CERTIFICATIONS: Traffic Control Plan Training YEARS OF EXPERIENCE: 24 Years YEARS WITH RJ BEHAR: 2004 —Present ENGINEERING EXPERIENCE Mr. Mazorra has been the Project Engineer /Manager for the preparation of numerous, very successful highway construction plans. This included design of horizontal and vertical geometry with GEOPAK software. He has done drafting plans, profiles, cross sections, traffic controls and various ancillary roadway plan sheets using MicroStation software. Mr. Mazorra has designed roadway signal plans in collaboration with traffic engineering and structural engineering personnel. He also has 11 years of experience as an FDOT employee and knows the policies and needs of the FDOT from both a technical and managerial perspective, and can thereby assure the success of any project. At RJ Behar, Mr. Mazorra is responsible for the design, project management and quality control for the Company's Highway Group. He has 24 years of experience. RELEVANT EXPERIENCE DESIGN /BUILD P3 FOR 1 -595 FINAL DESIGN — BROWARD COUNTY, FL — FDOT DISTRICT 4 (AECOM /DRAGADOS) Task Manager — He is in charge of the design and production of the signalization design of 12 intersections along SR -84 for the reconstruction of the 1 -595 corridor. POWERLINE ROAD (SR -845) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 Project Engineer for the signal design. The project included milling and resurfacing 3 miles of a major collector, 8 signal upgrades, safety improvements and miscellaneous drainage improvements. NW 87th AVENUE (SR- 973 /GALLOWAY ROAD) MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6 Project Engineer in charge of the signalization plans for the new construction and reconstruction of NW 871h Avenue from NW 74th Street to NW 103rd Street in Medley, Florida. The scope of this project included roadway plans, drainage, traffic, lighting, signing and marking, signalization and bridge plans. SR -806 (ATLANTIC AVENUE) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 Project Manager — Responsible for this milling and resurfacing (RRR) project of 3 miles of a major arterial, signal improvements, safety improvements and miscellaneous drainage improvements. SR -838 (SUNRISE BOULEVARD) NW 27th AVENUE, BROWARD COUNTY, FL — FDOT, DISTRICT 4 Project Manager in charge of the design and production of roadway, signing and pavement marking, and signalization plans. The scope of this safety improvement project is to mill and resurface NW 27th Avenue, as well as improve the existing signalization system. SR -838 (SUNRISE BOULEVARD) NW 31St AVENUE BROWARD COUNTY, FL — FDOT, DISTRICT 4 Project Manager in charge of the design and production of roadway, signing and pavement marking, and signalization plans. The scope of this safety improvement project is the addition of two left turn lanes, milling and resurfacing, and pavement widening and the addition of two new signal mast arms. NW 44th STREET — CITY OF LAUDERDALE LAKES, FL Project Manager — Construction of a new 4 -lane median divided facility. The project includes roadway plans, drainage plans, privacy walls plans, and permitting, utility coordination and inspection services. ATLANTIC BOULEVARD /ROCK ISLAND ROAD INTERSECTION IMPROVEMENT — BROWARD COUNTY ENGINEERING Project Manager — He prepared the traffic study, roadway plans, signalization plans, signage plans, drainage plans and utility coordination for a major intersection improvement. HILLSBORO BOULEVARD /MILITARY TRAIL INTERSECTION IMPROVEMENT — BROWARD COUNTY ENGINEERING Project Manager — He prepared the traffic study, roadway plans, signalization plans, signage plans, drainage plans and utility coordination for this major intersection improvement. ® R.).Behar R. I. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 8 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G 1 N E E R I N G S E R V I C E S HOLLYWOOD BOULEVARD /N. 281h AVENUE INTERSECTION IMPROVEMENT — BROWARD COUNTY ENGINEERING Project Manager — He prepared the traffic study, roadway plans, signalization plans, signage plans, drainage plans and utility coordination for this major intersection improvement. SR -820 (PINES /HOLLYWOOD BOULEVARD) FROM EAST OF 64th WAY TO WEST OF SR -7, BROWARD COUNTY, FL — FDOT, DISTRICT 4 Project Manager — Responsible for this milling and resurfacing (RRR) of the existing pavement; upgrading roadway signs and curb ramps to meet current standards, upgrade pedestrian and signal features and Landscape improvements. SR- 836/SR -826 (SECTION 5) PLANS REVIEW — MDX (EAC CONSULTING, INC.) Project Engineer— Reviewed roadway plans and provided comments. SR- 5 /US -1 RESURFACING (BOCA RATON, FL) — FDOT, DISTRICT 4 Project Manager — He was responsible for the milling and resurfacing (RRR) project of 1.4 miles of a major collector. Upgraded pavement markings were included. SR -5 (US -1 /SOUTH FEDERAL HIGHWAY) DEERFIELD BEACH, FL — FDOT, DISTRICT 4 Project Manager — He was responsible for the milling and resurfacing (RRR) of a major arterial; including safety improvements. SR -5 (BISCAYNE BOULEVARD) DOWNTOWN MIAMI — FDOT, DISTRICT 6 Project Engineer in charge of signal and streetlight design in Downtown Miami. SR -909 (WEST DIXIE HIGHWAY) — FDOT, DISTRICT 6 Project Engineer in charge of signal and streetlight design. SR -922 (96th STREET) — FDOT, DISTRICT 6 Project Engineer in charge of signal design. SR -934 (NW 81St /NE 82nd STREET) — FDOT, DISTRICT 6 Project Manager for resurfacing and replacement of traffic signals and street lights. SR- 985 /FLAGLER STREET INTERSECTION — FDOT, DISTRICT 6 Project Engineer in charge of signal design. HEFT MEDIAN SAFETY IMPROVEMENTS — FDOT TURNPIKE ENTERPRISE Senior Highway Engineer in charge of the design of the construction, resurfacing and safety improvements. SR -5 (US -1) ST. LUCIE COUNTY, FL — FDOT, DISTRICT 4 Project Manager/ Engineer - RRR project in St. Lucie County, FL SR -802 LAKE WORTH ROAD /MILITARY TRAIL INTERSECTION — FDOT, DISTRICT 4 Project Engineer for RRR intersection improvements. SR -824 PEMBROKE ROAD /72nd AVENUE INTERSECTION — FDOT, DISTRICT 4 Project Engineer for RRR intersection improvement. RAILROAD HAZARD BEACON — FDOT, DISTRICT 4 Project Engineer— Installed hazard beacons at various locations districtwide. SR -834 SAMPLE ROAD /NE 3rd AVENUE INTERSECTION — FDOT, DISTRICT 4 Project Engineer for RRR intersection improvement. SR- 862/1 -595 IMPROVEMENTS — FDOT, DISTRICT 4 Project Engineer - Realignment of expressway entrance ramps. SR -94 (KENDALL DRIVE) — FDOT, DISTRICT 6 Project Engineer in charge of resurfacing and reconstruction. COUNTYWIDE - MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6 Project Engineer for traffic signal railroad preemptions. SR -823 (NW 57th AVENUE) — FDOT, DISTRICT 6 Project Engineer for complete reconstruction of 4 -lane facility to 6 -lane divided. SR -5 (US -1) MATECUMBE KEY — FDOT, DISTRICT 6 Project Engineer for resurfacing project on upper Matecumbe Key, Florida. SR -976 (BIRD ROAD) — FDOT, DISTRICT 6 Project Engineer for resurfacing and reconstruction. EJR.).Behar R. I. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 9 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S ANTHONY V. ALFRED, PE HIGHWAY DESIGN EDUCATION: B.S. Civil Engineer, Florida International University, 1991 PROFESSIONAL REGISTRATIONS: P. E. Florida No. 51857/1997 TRAINING /CERTIFICATIONS: Advanced Work Zone Traffic Control Training 2007; APWA — NPDES Requirements & Understanding Stormwater Collection System 2010; Roadside Design Course, October 2002; Stream Stability and Scour at Highway Bridges YEARS OF EXPERIENCE: 19 Years YEARS WITH RJ BEHAR: 2006 —Present ENGINEERING EXPERIENCE Mr. Alfred has extensive experience in transportation design engineering. He is well- versed with the FDOT design and plans preparation process. He has participated in public involvement, and has been the Utility Coordinator for many FDOT projects. He proficiently uses and trains staff on the use MicroStation (V8) /GEOPAK, running the FDOT SiteMenu. He has experience in the preparation of lighting analysis using the AG132 software. He has used electronic delivery (PEDDS) to submit projects to FDOT, District 4. Mr. Alfred has 19 years of experience and brings a wealth of knowledge in transportation engineering and design. Mr. Alfred is also MOT certified for FDOT projects. RELEVANT EXPERIENCE BUENA VISTA HEIGHTS — CITY OF MIAMI, FL Project Manager — The scope included design and production of roadway plans, drainage, milling and resurfacing, overbuild and widening, new curb, signing and pavement marking plans and permit package. MIAMI RIVER GREENWAYS, SEGMENT D — CITY OF MIAMI, FL Project Manager — The project consists of the reconstruction of an existing roadway segment along the Miami River to produce a scenic, landscaped, pedestrian /bicycle walkway /greenway. The project includes the design of a drainage system with wells, decorative lighting and landscape /hardscape design. NORTH BAYSHORE DRIVE OPERATIONAL IMPROVEMENTS — CITY OF MIAMI, FL Project Engineer — Project consists of roundabout/construction along with milling and resurfacing at the intersection of North Bayshore Drive and NE 171h Terrace, which includes roadway plans, signing & marking plans and landscaping plans. As part of the improvements for this area, we are introducing the design of a roundabout (traffic circle) on the corner of North Bayshore Drive and NE 171h Terrace. DOWNTOWN MIAMI STORM SEWER PROJECT (NORTH BAYSHORE DRIVE) — CITY OF MIAMI, FL Quality Control Engineer — The project consisted of a total reconstruction of the roadway, and the design and implementation of a drainage system which included the replacement of the subsurface drainage system. Also as a part of the stormwater management system drainage wells were utilized to assist in alleviating flooding. The project required drainage calculations for approval from DERM. NW 87th AVENUE (SR- 973 /GALLOWAY ROAD), MIAMI -DADE COUNTY, FL— FDOT, DISTRICT 6 Project Manager responsible for roadway design of new construction and reconstruction of NW 871h Avenue from NW 74th Street to NW 103rd Street in Medley, Florida. The scope of this project included roadway plans, drainage, traffic, lighting, signing and marking, signalization and bridge plans. WEST 72nd STREET — CITY OF HIALEAH, FL Engineer of Record /Utility Coordinator — He designed and engineered all of the construction documents for the reconstruction of the roadway and drainage systems. He also performed all of the utility coordination. SW 3281h STREET FROM SW 152nd AVENUE TO SW 137th AVENUE — MIAMI -DADE COUNTY PUBLIC WORKS Senior Project Engineer — The scope of the project included master planning and feasibility analysis for the new roadway. This project involved the upgrading of the existing traffic signals to mast -arms and internally illuminated signs. The design phase for this project included drainage, lighting, signalization, signing and pavement markings, ® R.j.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 10 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G 1 N E E R 1 N G S E R V I C E S ,V, , 'SR 836 EMERGENCY RAMP, MIAMI, FL — MIAMI -DADE EXPRESSWAY AUTHORITY Project Manager — The project consists of the creating a single lane ramp that connects the Florida Turnpike on -ramp to the westbound SR 836 extension for emergency use only. The emergency ramp was requested by the Miami -Dade Fire Rescue Department to reduce their response time to emergencies along the 836 extension and locations where using the 836 extension would be the most direct route. This design is considered "complex- highway" and will be part of the MDX system. An emergency u -turn will be designed on the SR 836 Extension between SW 127th Avenue and SW 137th Avenue. The design of a retaining wall will also be required along the alignment in the vicinity of the South Florida Water Management District C -2 Canal. All the associated drainage design, environmental permitting and utility coordination will be part of this project as well. DISTRICTWIDE IN -HOUSE CONSULTANT PLANS REVIEWISUPPORT SERVICES, FORT LAUDERDALE, FL — FDOT, DISTRICT 4 Project Manager — Plans Review: The project includes reviews for compliance with FDOT criteria, construction time estimate preparation /review, review of computation booklets, specification packages, cost estimates, etc. The deliverables include review comments in the ERC database, marked -up plans, design exception variation reports, contract time estimates, traffic control plan review /constructability, quantity computations with pay item verifications, utility conflicts, right -of -way encroachments, etc. Design Support Services: Perform design services for the FDOT issued on a Task Work Order basis. The deliverables will be CADD compliant, in electronic format, signed and sealed with PEDDS. NORTH MIAMI AVENUE BETWEEN NE 16911 STREET & 1700 STREET, EAST 169th STREET AND 170th STREET — CITY OF NORTH MIAMI BEACH, FL Engineer of Record - for the addition of cul -de -sacs, curb and gutter typical sections, parking areas and drainage improvements; including utility coordination and public involvement. EAST 56th STREET, 8th AVENUE TO EAST OF THE UPS ENTRANCE — CITY OF HIALEAH, FL Project Engineer — Developed the horizontal and vertical geometric design, drainage, typical sections, and earthwork computations; including a complete set of roadway, drainage, traffic control and signing /marking plans; generated quantities and prepared display boards for and attended the public involvement meetings as well as the utility coordinator. MIAMI -DADE AVIATION DEPARTMENT, CENTRAL BOULEVARD — MIAMI, FL Project Engineer — Finalized the design for the roadway widening and improvement project for the passenger entrance and exit roadway at the Miami International Airport; including final profile designs, ramp geometry, plans and calculated final quantities. HILLSBORO BOULEVARD /MILITARY TRAIL INTERSECTION IMPROVEMENT — BROWARD COUNTY ENGINEERING Project Engineer — Prepared roadway plans, signing and pavement marking plans, drainage plans, and utility coordination for this major intersection improvement project. NW 7th/gth AVENUE CONNECTOR (DESIGN) — CITY OF FORT LAUDERDALE, FL Project Engineer — The project includes the roadway design of a 1.5 mile urban section, 4 -lane divided, connector between NW 7th and NW 91h Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing pavement marking and permitting as well as public involvement coordination. NW 44th STREET DRAINAGE IMPROVEMENTS — CITY OF SUNRISE, FL Project Engineer — Prepared design construction documents and specifications for construction of a swale with sidewalks and tree wells, which included a typical section analysis, plans, cross sections, drainage structures, traffic control plans and stormwater pollution prevention plans. A drainage analysis was also performed for the design of the outfall structure that connects to a local canal. POWERLINE ROAD, FORT LAUDERDALE /POMPANO BEACH, FL — FDOT, DISTRICT 4 Engineer of Record /Utility Manager — Responsibilities included the design and plans production for this RRR project. This project involved modifying the longitudinal median profile to correct the cross slope, pavement design, drainage improvements, traffic control plans, signing and pavement marking (including overhead sign structures), functioned as the utility manager /coordinated relocations with Florida Power Line transmission poles, landscaping, conventional lighting and mast arm signals. He also prepared the resurfacing, restoration and rehabilitation (3R) report, lighting plans and the lighting analysis report. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 11 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G 1 N E E R I N G S E R V I C E S SEAN F. O'KEEFE, PE QC /REVIEWS EDUCATION: B.S. Civil Engineering, University of Iowa, 1981 PROFESSIONAL REGISTRATIONS: P.E. Florida License No. 41766, 1989 YEARS OF EXPERIENCE: 29 Years YEARS WITH RJ BEHAR: 2005 —Present ENGINEERING EXPERIENCE With over twenty -nine years experience in the project management, planning, design and construction of large civil engineering projects, Mr. O'Keefe provides a special emphasis on transportation, highways and related structures. Mr. O'Keefe has considerable project infrastructure support experience in drainage, sewer, utility relocations, lighting, structures, site development, landscaping and survey. He has integrated an effective blend of traffic analysis and traffic operations improvements in all of his projects, including signing, striping and signalization. For this contract, he will be responsible for Quality Control and Quality Assurance as well as assist with any of the transportation projects involved in this contract. RELEVANT EXPERIENCE DESIGN /BUILD FOR THE RECONSTRUCTION OF SE 3rd STREET, BELLE GLADE, FL — FDOT, DISTRICT 4 Project Manager /Engineer of Record — The scope of this project included roadway plans, drainage design, signing and marking plans, lighting, stormwater permitting and utility relocation plans. The design included the use of filter fabric and a thick sub -base in lieu of demucking the roadway. The project also included water and sewer plans to be constructed as part of the roadway improvements. 1 -75 /GRIFFIN ROAD INTERCHANGE, FINAL DESIGN, BROWARD COUNTY, FL — FDOT DISTRICT 4 Project Manager — The scope of the project included roadway improvements, drainage, permitting, bridge, structural, signing and pavement markings, signalization, lighting, landscaping, utility coordination, pavement design and quantities. The scope included a study which consisted of the preparation of an Interchange Operational Analysis Report (IOAR) for the interchange at Griffin Road and 1 -75 in Broward County. The study included Signalized Intersection Analysis, Weaving Analysis, Queuing Analysis, Ramp Analysis, Interchange Capacity Analysis, and Crash Analysis. POWERLINE ROAD (SR -845) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 Project Manager — The project consisted of the resurfacing of 3 miles of Powerline Road in Palm Beach County. This project involved preparing the Resurface, Restoration and Rehabilitation Report. The project included a safety analysis and a signal assessment analysis. It also involved extending the concrete sidewalk and stormwater permits. NW 87th AVENUE (SR- 973 /GALLOWAY ROAD) MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6 Traffic Engineer - He was responsible for the traffic analysis and Level of Service Study for the new route with six signalized intersections. NORTHLAKE BOULEVARD OVER THE LOXAHATCHEE SLOUGH — PALM BEACH COUNTY, FL Project Manager — The project involved reconstruction of a four lane divided highway, building a bridge, weir and walkway. He was responsible for the geometries, signing and pavement markings, weir placement, grading of the channel and walkway, quantity calculations and cost estimates. FLYING COW ROAD ROUNDABOUTS — VILLAGE OF WELLINGTON, FL Project Manager — RJ Behar prepared the layout of two roundabouts for the Village of Wellington along Flying Cow Road for future traffic calming. The preparation of the two roundabouts was based on Palm Beach County roadway design criteria and developed for right -of -way dedication by the adjacent property owners, in this case South Florida Water Management District (SFWMD). SW 147th AVENUE — MIAMI -DADE COUNTY PUBLIC WORKS DEPARTMENT, FL Project Manager — The scope included design replacement of a bridge with a 9'x11' aluminum arch culvert with minor roadway improvements SW 9711 AVENUE AND SW 1071h AVENUE BRIDGE DECK RECONSTRUCTION PROJECT — MIAMI -DADE COUNTY PUBLIC WORKS DEPARTMENT, FL Bridge Maintenance /Highway Design Engineer — The scope included the design of roadway improvements with bridge deck replacement, including roadway, drainage, utility relocations, safety improvements and maintenance of traffic. [] R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 12 i C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G I N E E R I N G S E R .V 1 C E S RAFAEL DE ARAZOZA, PE, PTOE, CPM TRAFFIC ENGINEERING EDUCATION: Certified Public Manager Florida State University /FDOT, 1989; BSCET, Florida International University, 1975; ASCET, Miami -Dade College, 1972, PROFESSIONAL REGISTRATIONS: P.E. Florida License No. 24487/1980; Professional Traffic Operations Engineer No. 2852/2010; Florida State /FDOT Certified Public Manager 1989 TRAINING /CERTIFICATIONS: Urban Transportation Planning; Highway Capacity /Level -of- Service Analyses; Transportation Modeling; Air Quality Analyses; Highway Financing; Traffic Impact Analyses; Traffic Operations and Safety Analyses; Traffic Engineering /Design; Roadway Design, Roadway Safety; Graduate of the FDOT /AASHTO Academy; FDOT Leadership Academy YEARS OF EXPERIENCE: 37 Years YEARS WITH RJ BEHAR: 2010— Present ENGINEERING EXPERIENCE Mr. De Arazoza has 37 years of transportation planning and traffic engineering experience. He has worked in both private and governmental agencies, including FDOT and Broward County. Mr. De Arazoza has held many high level management positions throughout his career. He is well- versed in traffic engineering design standards and procedures. RELEVANT EXPERIENCE SR- 836/SR -826 (SECTION 5) PLANS REVIEW — EAC CONSULTING, INC. /RJ BEHAR (MDX) Project Manager — In charge of reviewing the complex Interchange Guide Signs plans covering aspects such as size of lettering, symbols, required legend, sign locations, etc, to conform with the requirements of the Manual of Uniform Traffic Control Devices (MUTCD) and applicable FDOT regulations and standards. SR- 874 /DON SHULA EXPRESSWAY RAMP CONNECTOR - PROJECT DEVELOPMENT AND ENVIRONMENT (PD &E) STUDY — METRIC ENGINEERING, INC. /RJ BEHAR (MDX) Project Manager — He is in charge of the required traffic engineering analysis and the development of major documents, such as the Interchange Modification Report (IMR) and the Design Traffic Technical Memorandum (DTTM). NW 87th AVENUE TRAFFIC STUDY - MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6 Project Manager — He is in charge of a comprehensive traffic operations study to evaluate alternatives and determine potential improvement recommendations in developing traffic projections. TRANSPORTATION PLANNING AND TRAFFIC ENGINEERING CONSULTING SERVICES — TOWN OF CUTLER BAY, FL Project Manager — Transportation Element and Transportation Plan Lead staff. Performed work consisting of traffic engineering, traffic calming and safety studies as well as reviewing traffic impacts of proposed land developments. Traffic engineering work included capacity /level -of- service analyses, traffic signal warrant studies, intersection and arterial studies, safety studies, potential impacts of proposed land use developments. He successfully developed traffic calming and traffic engineering studies for the Town. As one of the key staff, he contributed successfully in the development of the Town's Transportation Element and Transportation Master Plan. UPDATE OF THE TRANSPORTATION ELEMENT - CITY OF HIALEAH, FL Project Manager who updated of the City's Transportation Element to incorporate the annexed area northwest of the existing City boundaries. The study consisted of analyzing existing and future conditions on the transportation system and developing a future transportation system to include required improvements. This project was extensively coordinated with reviewing agencies and received approval by the City Council as well as both State agencies, the Dept. of Community Affairs (DCA) and the Florida Dept. of Transportation (FDOT). STRATEGIC INTERMODAL SYSTEM (SIS) ACTION & MASTER PLANS — FDOT, DISTRICT 6He is a member of the statewide technical committee who assisted with the development and establishment of the SIS. He directed the development of the SR- 997 /Krome Avenue and US -27 /Okeechobee Road Action Plans and the Following Master Plans: 1 -95 and 1 -195 in District 6. OTHER SIGNIFICANT EXPERIENCE Mr. De Arazoza experience includes supervising and providing technical guidance and support to transportation planning, roadway design and traffic engineering personnel throughout his career. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 13 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R 1 N G S E R V I C E S He provided and continues to provide management and technical support for traffic engineering and safety studies, transportation planning, land use planning, including public involvement and coordination with local governments. He provided quality assurance and quality control on all of the above activities. 2005 to 2009 — Reviewed more than 70 traffic impact studies for the City of Doral and other municipalities. He also prepared several traffic impact studies for the private sector. He conducted traffic engineering studies for the Florida Department of Transportation (FDOT) District 6 and District 4 and provided traffic engineering analyses and design support for major SIS /FINS PD& E projects, such as portions of the 1 -95 corridor in FDOT District 4 as well as other districts. He successfully managed and completed major studies such as the Transportation Master Plans for Doral, Cutler Bay and Miami Gardens; Transportation Elements for Miami Gardens, Hialeah, Miami Beach and Cutler Bay and Transportation Concurrency Management Areas (TCMA) for Miami Gardens, the TCMA updates for Hialeah and Sarasota; traffic calming studies for Palmetto Bay and numerous traffic engineering studies (including capacity /level -of- service analyses, operations, safety, traffic calming and access management) for Hialeah, Miami, Miami Beach, Miami Gardens, Doral, Cutler Bay and Palmetto Bay. He performed crash /accident analyses to determine the cause and develop improvement recommendations. FLORIDA DEPARTMENT OF TRANSPORTATION, DISTRICT 6 (1981 -2004) - DISTRICT SIX PLANNING MANAGER In charge of the District Planning Office which included managing and directing transportation planning functions and related programs in Miami -Dade and Monroe Counties pursuant to all state and federal requirements. This included managing consulting firms and all fiscal /budget related matters for the Planning Department and traffic engineering analysis support. These areas covered functions such as the Miami -Dade Metropolitan Planning Organization (MPO) Urban Transportation Planning Process; development of transportation improvement projects, Air Quality; Florida Growth Management Process, concurrency reviews /capacity /level -of- service determinations and many reviews of proposed land developments (including DRIs) traffic impacts to the state highway system; functional /jurisdictional designations; access management classifications; Interstate Highway System designations; transportation statistics; transportation planning support to the MPO; transportation management systems and several major traffic engineering, roadway safety and transportation corridor studies, including 1 -95, 1 -395, SR 826 /Palmetto Expressway and Krome Avenue among others. - ASSISTANT DISTRICT TRAFFIC OPERATIONS ENGINEER Responsible for directing and conducting traffic engineering, roadway capacity /level -of service analyses, operations and safety studies for the District to determine needed improvement projects. Responsibilities included traffic regulatory requests and development and preparation of traffic construction plans. He performed crash /accident analyses to determine the cause and develop improvement recommendations. He performed numerous reviews of traffic impact studies on behalf of the District. Tasks and functions included managing engineering consultants. DISTRICT TRAFFIC ENGINEERING DESIGN ENGINEER Managerial position with the overall responsibility of ensuring that traffic engineering design standards and procedures were followed and adhered to Districtwide. He provided guidance and assistance to engineering personnel in evaluating traffic engineering issues, traffic engineering, highway capacity /level -of- service analyses and traffic design related functions. Tasks and functions included managing engineering consultants. - DISTRICT INTERNAL ROADWAY DESIGN ENGINEER Management position responsible for directing the District Roadway Internal Design Unit. He was responsible for overseeing all activities leading to complete preparation of roadway design plans. This included traffic engineering design. Tasks and functions also included managing engineering consultants. While he was employed at FDOT, Mr. De Arazoza was responsible for conducting more than 20 corridor studies, many of which were major undertakings such as FIHS Master and Action Plans and more than 50 traffic operations and safety studies. Most of the corridors studies involved traffic operations and engineering analyses (including roadway capacity /level -of- service analyses) as well as roadway design engineering applications, social, environmental and economic considerations. He also reviewed many traffic impact studies. 1] R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 14 C I T Y OF S U N N Y I S L E S B E A C H T R A F F 1 C E N G I N E E R I N G S E R V I C E S DAVID M. BOYER DRAINAGEIPERMITTING EDUCATION: B.S. Environmental Engineering, University of South Florida, Tampa, Florida, April 1985 PROFESSIONAL REGISTRATIONS: P. E. Florida License No. 43226, P.E. Washington License No. 34591 TRAINING /CERTIFICATIONS: Multiple FDOT Design Conferences; Stormwater Quality Detention Pond Design; Stream Stability and Scour YEARS OF EXPERIENCE: 25 Years YEARS WITH RJ BEHAR: 2009— Present ENGINEERING EXPERIENCE Mr. Boyer has over 25 years of experience including expertise in stormwater management and treatment system design, highway, municipal and private drainage design and project management. Mr. Boyer also has an extensive background in roadway drainage design and permitting projects for the Florida Department of Transportation (FDOT) on multiple Interstate and Turnpike roadway widenings. He also has experience in the drainage design on several airport projects, such as the Miami International Airport and the Fort Lauderdale - Hollywood International Airport. At RJ Behar, he is the Water Resources Director. RELEVANT EXPERIENCE SR -836 EMERGENCY ACCESS RAMP, MIAMI -DADE COUNTY, FL — MIAMI -DADE EXPRESSWAY AUTHORITY Drainage Engineer of Record — All the associated drainage design, environmental permitting and utility coordination are a part of this project. The project consists of creating a single lane ramp that connects the Florida Turnpike on -ramp to the westbound SR- 836 extension for emergency use only. The emergency ramp was requested by the Miami -Dade Fire Rescue Department to reduce their response time to emergencies along the SR -836 extension and locations where using the SR -836 extension would be the most direct route. This design is considered "complex- highway" and will be part of the MDX system. An emergency u -turn will be designed on the SR -836 Extension between SW 12711 Avenue and SW 1371h Avenue. DESIGN /BUILD FOR 1.595 FINAL DESIGN, BROWARD COUNTY, FL — FDOT, DISTRICT 4 (AECOM /DRAGADOS) Water Resources Director responsible for the overall drainage master plan update and complete drainage design for the entire corridor, which includes exfiltration trench, storm sewer design and analysis, cross drain analysis, and both wet and dry retention stormwater management designs for seven out of eight design zones and is responsible for the drainage plan preparation for two roadway design sections, as well as all coordination between six different design firms. The scope includes exfiltration trench design, storm sewer design and analysis, and both wet and dry retention stormwater management pond designs. NW 7th/91h AVENUE CONNECTOR (DESIGN) — CITY OF FORT LAUDERDALE, FL Lead Drainage Engineer — He is responsible for the urban drainage design, storm sewers, stormwater quality treatment, and permitting, The project includes the roadway design of an urban section, 4 -lane divided connector between NW 7th and NW 9th Avenues. The scope of this project includes signalization, drainage design, signing pavement marking and permitting as well as public involvement coordination. SR- 836 /AUXILLARY LANES PD &E STUDY — MDX, MIAMI -DADE COUNTY (SUB TO EAC CCONSULTING, INC.) Drainage Engineer — The scope of the project he prepared the conceptual drainage report AICPR SR- A1A/COLLINS AVENUE RESURFACING (PHASE 1) MIAMI BEACH, FL— FDOT, DISTRICT 6 Senior Drainage Engineer for drainage design and permitting. The scope of this project included design services for SR- A1A/Collins Avenue from 26th Street to Indian Creek Drive in Miami Beach, Florida 1.95 HOV LANES (SOUTH OF PGA BOULEVARD TO SOUTH OF DONALD ROSS ROAD) PALM BEACH COUNTY, FLORIDA— FDOT DISTRICT 4 Senior Drainage Engineer for this widening project. Analysis involved exfiltration trench design, storm sewer design and analysis, box culvert, cross -drain analysis, design of dry retention treatment systems parallel to the interstate, and stormwater permitting. 1.95 HOV WIDENING (BLUE HERON BOULEVARD TO PGA BOULEVARD) PALM BEACH COUNTY, FLORIDA — FDOT DISTRICT 4 Senior Drainage Engineer responsible for quality control and review of drainage design that included exfiltration trench design, storm sewer design and analysis, box culvert and cross drain analysis and design of roadside swales for dry detention areas. He was also responsible for the stormwater permitting. 1 R.).Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 15 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S SR -80 DESIGN EAST, PARKER AVENUE TO AUSTRALIAN AVENUE, WEST PALM BEACH, FL — FDOT DISTRICT 4 Drainage Design Engineer for 0.75 mile widening project. Analysis involved exfiltration trench design, storm sewer design and analysis, coordination with other SR -80 design projects and stormwater permitting. He also provided post construction drainage services. SR 80- DESIGN WEST, EAST OF KIRK ROAD TO WEST OF HAVERHILL BOULEVARD, WEST PALM BEACH, FL — FDOT DISTRICT 4 Senior Drainage Engineer — He was responsible for all drainage aspects for the team providing the complex engineering design and permitting services for SR -80 from west of Haverhill Road to east of Kirk Road. The program included five bridges with retaining walls and a 2,500 foot bulkhead along the north side of the C -51 Canal. He also provided post construction drainage services. SR- 710 /BEELINE HIGHWAY DESIGN (EAST AND WEST) — FDOT DISTRICT 4 Senior Drainage Engineer for the design of two new construction /widening projects. The combined length of both projects was 5.33 miles. The western project consisted of the addition of two new lanes to provide a four -lane divided rural roadway, along with the replacement of the existing two -lane bridge and the construction of a new two -lane parallel bridge. The eastern project consisted of the new construction to provide a four -lane divided urban roadway. He was responsible for the drainage design, stormwater management and permitting. Mr. Boyer also obtained a water use permit for irrigation from wells and provided post construction drainage services. SR- 5 /US -1 IMPROVEMENT — FDOT DISTRICT 4 Senior Drainage Design Engineer on this 2.9 mile road improvement project in St. Lucie County. Analysis involved exfiltration trench design, storm sewer design and analysis, cross drain analysis and coordination with St. Lucie County on the design of three regional stormwater ponds. He was responsible for all of the drainage permitting. He also provided post construction drainage services. LE JEUNE ROAD FROM SR -836 TO NW 21s' STREET (MIAMI INTERMODAL CENTER, 106.1) MIAMI, FL — FDOT DISTRICT 6 Senior Drainage Design Engineer for the relocation of the existing six -lane road and new construction of the connector - distributor road and connecting ramps as part of the Miami Intermodal Center associated with Miami International Airport. Analysis included urban storm sewer design, exfiltration trench design, interconnected dry retention ponds design and stormwater permitting to FDOT District 6 standards. He also provided post construction drainage services. TURNPIKE MAINLINE WIDENING FROM NORTH OF SUNRISE BOULEVARD TO ATLANTIC BOULEVARD, BROWARD COUNTY, FL— FLORIDA'S TURNPIKE ENTERPRISE Senior Drainage Engineer responsible for all aspects of the drainage design and permitting of 6.5 miles of widening that included three bridge widening, two bridge replacements and a toll plaza modification to accommodate widening from six -lanes to eight - lanes. Drainage analysis involved slotted trench and exfiltration trench, storm sewer design and analysis; box culvert and cross drain analysis, and both wet and dry retention stormwater management designs. Bridge Hydraulics analyses were completed for each bridge. He also provided post construction drainage services. This project was also broken into northbound and southbound sections for construction to allow for relocation of two high pressure gaslines. Both sections had to be repermitted individually. TURNPIKE LAKE WORTH ROAD TO OKEECHOBEE BOULEVARD — FLORIDA'S TURNPIKE ENTERPRISE Senior Drainage Engineer responsible for all aspects of the drainage design and permitting of widening from six -lanes to eight - lanes. Drainage analysis involved slotted trench and exfiltration trench, storm sewer design and analysis; box culvert and cross drain analysis, and both wet and dry retention stormwater management designs, as well as all drainage permitting responsibilities. Two bridge hydraulics analyses were performed, one over the C -51 canal and another over an LWDD canal. TURNPIKE HEFT TO JOHNSON STREET — FLORIDA'S TURNPIKE ENTERPRISE Senior Drainage Engineer responsible for all aspects of the drainage design and permitting of 2.1 miles of widening that included the Hollywood Boulevard Interchange and was designed to accommodate widening from six -lanes to eight - lanes. Drainage analysis involved slotted trench and exfiltration trench, storm sewer design and analysis, box culvert and cross -drain analysis, and both wet and dry retention stormwater management designs, as well as all drainage permitting responsibilities. This project was also broken into northbound and southbound sections for construction to allow for relocation of two high pressure gas lines. Both sections had to be repermitted individually. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 16 C I T Y OF S U N N Y I S L E S B E A C H T R A F F 1 C E N G I N E E R 1 N G S E R V I C E S DAVID G. ROMANO, PE QC /REVIEWS EDUCATION: M.S. in Construction Management, Florida International University, 1995; B.S. in Civil and Architectural Engineering, University of Miami, 1993 PROFESSIONAL REGISTRATIONS: P.E. Florida License No. 63817/2006, CTQP ID #: R55016771 YEARS OF EXPERIENCE: 16 Years YEARS WITH RJ BEHAR: 2008 —Present ENGINEERING EXPERIENCE Mr. Romano is a licensed Professional Engineer with a Master of Science degree in Construction Management and has over 16 years of experience specializing in the areas of construction engineering, inspection and management (CEI &M). He has worked as a Senior Project Engineer /Project Engineer on various roadway construction projects in Miami -Dade, Broward, and Palm Beach Counties for FDOT Districts 4, 6, and the Turnpike, with an aggregate dollar value of over $100 million. Mr. Romano is responsible for overseeing the construction operations, administration, management, and quality control, monthly and final estimates (close -out package) of the projects. His knowledge includes all facets of CEI responsibilities including the oversight of construction operations, administration, public relations, quality control, final estimates and claims analysis. RELEVANT EXPERIENCE CONSTRUCTION ENGINEERING INSPECTION OVERSIGHT FOR ARRA LAP PROJECTS, BROWARD COUNTY, FL — FDOT, DISTRICT 4 Senior Project Engineer for FDOT's Broward Operation Center. This project consists of monitoring various local agencies throughout Broward County for EEO /AA /DBE compliance to ensure adherence to the Federal ARRA requirements and FDOT Local Agency Program (LAP) specifications. W. 36th AVENUE (FROM W. 76th STREET TO W. 84th STREET) CEI — CITY OF HIALEAH, FL; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Project Manager — Responsible for overseeing the reconstruction of West 36th Avenue, from West 761h Street to West 84th Street within the City of Hialeah. The general overview and scope of the project comprised of the complete reconstruction of West 361h Avenue. The project scope also included pavement milling and resurfacing, signing and pavement markings, street lighting, tree removal, and grading of the adjacent swale areas and sod restoration with Performance Turf. W. 53rd STREET (FROM W. 41h AVENUE TO W. 811 AVENUE) CEI — CITY OF HIALEAH, FL; AMERICAN RECOVERY & REINVESTMENT ACT Project Manager /Senior Project Engineer — He is responsible for the West 53,d Street ARRA- Funded reconstruction projects within the City of Hialeah. The general overview and scope for these two projects comprises of the complete reconstruction of West 53,d Street, including new sidewalk, curb and gutter, drainage improvements - new drainage Inlets, 18" storm sewer cross drainage pipe, 18" exfiltration trench (French Drain). Proposed in the project scope are pavement milling and resurfacing, signing and pavement markings, and grading of the adjacent swale areas and sod restoration with Performance Turf. W. 53,dSTREET (FROM W. 811 AVENUE TO W. 121h AVENUE) CEI — CITY OF HIALEAH, FL; AMERICAN RECOVERY & REINVESTMENT ACT Project Manager /Senior Project Engineer — He is responsible for the West 53,d Street ARRA- Funded reconstruction projects within the City of Hialeah. The general overview and scope for these two projects comprises of the complete reconstruction of West 531d Street, including new sidewalk, curb and gutter, drainage improvements - new drainage inlets,18" storm sewer cross drainage pipe, 18" exfiltration trench (French Drain). Proposed in the project scope are pavement milling and resurfacing, signing and pavement markings, and grading of the adjacent swale areas and sod restoration with Performance Turf. ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 17 C I T Y OF S U N N Y I S L. E S B E A C H T R A F F 1 C E N G I N E E R I N G S E R V I C E S PINES BOULEVARD (SR -820) AND 1.75 (SR -93) INTERCHANGE, CEI — CITY OF PEMBROKE PINES, FL — FDOT, DISTRICT 4 Senior Project Engineer on this $11.2 million Local Agency Program (LAP) project between the City of Pembroke Pines and the Florida Department of Transportation, District 4. This is a federally funded project consisting of urbanized improvements at the 1 -75 (SR -93) and Pines Boulevard (SR -820) Interchange. The project included modifying the existing interstate overpass, entrance and exit ramps from a rural configuration to an urban configuration, as well as widening, signalization, landscaping, and access management improvements along Pines Boulevard. "No- excuse Bonus" (250K) and "Incentive /Decentive" contracting method is being utilized. PEMBROKE ROAD AND NW 1961h AVENUE SIDEWALK IMPROVEMENTS, CEI — CITY OF PEMBROKE PINES, FL; AMERICAN RECOVERY & REINVESTMENT ACT Senior Project Engineer in charge of the City of Pembroke Pines Sidewalk Improvements Project. This project includes the addition of approximately 22,600 LF of sidewalk adjacent to the right -of -way, milling and resurfacing, signing and pavement markings, and new ADA ramps with detectable warning surfaces. In addition, thickened edge sidewalks with pedestrian handrails are to be installed where drop off conditions warrant. The project also consists of drainage improvements, new curb installation, guardrail removal, grading of adjacent swales and sod restoration, and new landscaping. EMERGENCY WATER MAIN REPAIR — CITY OF PEMBROKE PINES, FL Senior Project Engineer in charge of full construction management services for the emergency repair of a 16" PVC transmission water main that ruptured along Pines Boulevard, east of NW 145th Avenue in the City of Pembroke Pines. The project consisted of the replacement of 20 If. of a 16" PVC water main with 16" DIP retrained sleeve pipe, fire hydrant installation for flushing and testing, backfill and compaction following FDOT specifications. The project also included the removal and replacement of two driveways connecting a shopping center with Pines Boulevard, striping and ADA sidewalk ramps. This project was executed as time and material, therefore a meticulous tracking of all contractor activities and final cost estimates was required. SR -811 (NE 4th AVENUE) FROM SUNRISE BOULEVARD TO SOUTH OF SOUTH FORK MIDDLE RIVER, FORT LAUDERDALE, FL — FDOT, DISTRICT 4 Senior Project Engineer responsible for the milling /resurfacing of NE 4th Avenue including drainage, pavement markings, signalization, raised median, sidewalk, curb & gutter, landscaping and irrigation - $1.8 million. SR -5 (FEDERAL HIGHWAY) FROM SUNRISE BOULEVARD TO OAKLAND PARK BOULEVARD, FORT LAUDERDALE, FL — FDOT, DISTRICT 4 Senior Project Engineer responsible for the milling, resurfacing and widening of Federal Highway ($7.7 million); including reconstruction of NE 131h Street, repairs to the Middle River Canal Bridge, drainage, pavement markings, traffic separator, raised median, signalization, utility relocation, sidewalk, curb & gutter, bus pads, landscaping and irrigation. "No- excuse Bonus" (310K) and "Incentive /Decentive" contracting method utilized. SR -5 (DIXIE HIGHWAY) FROM LAKEVIEW TO PALM BEACH LAKES BOULEVARD, WEST PALM BEACH, FL — FDOT, DISTRICT 4 Project Engineer responsible for the reconstruction of SR 5 ($14 million) including drainage, JPA with the City of West Palm Beach for the installation of new sanitary and water mains throughout the project, utility relocations, signalization, communication, lighting, landscaping, irrigation, traffic calming and beautification. "No- Excuse Bonus" ($600K) contracting method project was utilized. SR -805 (DIXIE HIGHWAY) FROM 6th AVENUE SOUTH TO 10th AVENUE NORTH, PALM BEACH COUNTY, FL — FDOT DISTRICT 4 Roadway Inspector responsible for overseeing the Contractor's performance for conformance with plans, specifications, traffic control plans and materials standards, maintained daily field reports, density log books, field books, striping log book, and assisted the Project Engineer in preparing weekly and monthly reports, as well as the final estimates package. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 18 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S PAOLA RIVEROS, El DRAINAGE /PERMITTING EDUCATION: B.S. Civil Engineering, Florida International University, Miami, Florida, April 2001 PROFESSIONAL REGISTRATIONS: E.I. Florida No.100007604, 2002; P.E. Washington, DC No. 905769, 2010 TRAINING /CERTIFICATIONS: Drainage Design using ASAD; FDOT CADD Update Training Seminar; Bentley MicroStation V8 User Update; ICPR Hands -On Training Seminar, Streamline Technologies, Inc.; Design of Storm Sewers and Pavement Drainage, Water Resources Learning Center; FDOT CADD Update Training Seminar; FDOT PPM Design Update Training; Bentley Geopack Conference; GIS Training YEARS OF EXPERIENCE: 10 Years YEARS WITH RJ BEHAR: 2001 —Present ENGINEERING EXPERIENCE Ms. Riveros has been responsible for the preparation of roadway plans and site plans throughout South Florida. She has assisted in drainage computations for FDOT and City projects. She has also performed construction cost estimates for improvements that included street construction, buildings construction, and landscaping projects. Her responsibilities have included the preparation of drawings in MicroStation and AutoCAD for civil and roadway projects. At RJ Behar, Ms. Riveros is responsible for support in drainage and permitting projects. She drafted and performed revisions to site, utility, drainage, and landscaped plans. Ms. Riveros has more than ten years of experience. RELEVANT EXPERIENCE DESIGN/BUILD FOR 1.595 FINAL DESIGN, BROWARD COUNTY, FL — FDOT, DISTRICT 4 (AECOMIDRAGADOS) Project Engineer involved with drainage design for several sections of the corridor. Design tasks include exfiltration trench design, storm sewer design and analysis, and both wet and dry retention stormwater management pond designs. The design involved the use of spreadsheets, ICPR, ASAD and Microstation NORTH COUNTY NEIGHBORHOOD IMPROVEMENT PROJECT — BROWARD COUNTY, FL Project Engineer in charge of drainage design and permitting. NW 87th AVENUE (SR- 973 /GALLOWAY ROAD) MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6 Project Engineer — She prepared the drainage plans for new construction of a major arterial. The scope includes final design and future new reconstruction, roadway design, traffic operations, drainage, structure and construction. SR -A1A RESURFACING PROJECT, PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 Project Designer for RRR project, from the Boynton Inlet Bridge to SR -802 (Lake Worth). The project included milling and resurfacing for 4 miles and reconstruction of 1 mile of a major rural roadway, as well as drainage improvements, coastal drainage studies, pavement marking and signing, overhead signing plans, lighting plans, three signal locations, bridge plans, wetland mitigation, public involvement, design documentation and landscape plans. POWERLINE ROAD (SR -845) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 Project Designer — The project included milling and resurfacing of 3 miles of a major collector, 8 signal upgrades, safety improvements and miscellaneous drainage improvements. SR- 5 /US -1 RESURFACING, BOCA RATON, FL — FDOT, DISTRICT 4 Project Engineer Designer — The project consisted of milling and resurfacing the existing pavement; upgraded signal pedestrian features to current ADA standards. The scope also included new signing and pavement markings and upgrading landscaping. US -1 (FEDERAL HIGHWAY) HALLANDALE BEACH, FL — FDOT DISTRICT 4 Project Designer — This RRR project went from the County Line to Hallandale Beach Boulevard. This project included the design of a 0.8 miles, six -lane, urban, divided highway as well as minor drainage Improvements. HOLLYWOOD BOULEVARD (SR -820) FROM SR -A1A TO US -1 — FDOT, DISTRICT 4 Project Engineer for the preparation of drainage plans, including coordination with utilities. SOUTHERN BOULEVARD (SR -80) DRAINAGE DESIGN — FDOT, DISTRICT 4 Project Engineer — She performed area calculations and input data into AdICPR stormwater model. She performed floodplain volume compensation calculations. BLUE HERON BOULEVARD — FDOT DISTRICT 4 Drainage Designer — She was responsible for the preparation of drainage plans. ® R.j.Behar R. J. BEHAR & COMPANY, INC. I RFQ N0. 11 -11 -01 1 19 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G 1 N E E R 1 N G S E R V I C E S ALTON ROAD (SR -907) — FDOT DISTRICT 6 Project Engineer who prepared the roadway plans for 4 miles of a 3R project as well as drainage structure sheets and details. KINGS HIGHWAY (SR -713) RESURFACING — FDOT DISTRICT 4 Project Engineer— She assisted in the preparation of the 3R report. She prepared the Summary of Crash Analysis. ANDREWS AVENUE — FDOT DISTRICT 4 (KEITH & SCHNARS, PA) Project Engineer— Preparation of pond sitting report. PALM AVENUE FINAL DESIGN FROM OKEECHOBEE ROAD TO 21St STREET — CITY OF HIALEAH, FL Project Engineer — Responsible for the preparation of construction drawings for roadway reconstruction and improvements on Palm Avenue. NORTHLAKE BOULEVARD BRIDGE OVER THE LOXAHATCHEE SLOUGH - PALM BEACH COUNTY, FL — FDOT DISTRICT 4 Project Engineer — Developed the preliminary HEC -RAS model for the new channel. Scope of services consisted of bridge design, drainage design, roadway improvements and permitting. RJ Behar is designing the relocation of 1,310 feet of 20 inch water main and 1,299 feet of 16 inch force main. The new water main and force main will be relocated on the new bridge. RJ Behar prepared all the details and structural design to accommodate the new utilities on the bridge. NEIGHBORHOOD PARTICIPATION PROGRAM — CITY OF SUNRISE, FL Project Engineer — She prepared cost estimates for eighteen neighborhood improvement projects. The project included performing field investigations to determine the project scope to estimate the quantities and cost for the improvements. VARIOUS COMMUNITIES — CITY OF SUNRISE, FL Project Engineer — She prepared cost estimates for 18 communities as part of the Neighborhood Participation Program. The scope of the project included new entry signs, landscaping, lighting, sidewalks, pavers and general improvements. ANSIN BOULEVARD — CITY OF HALLANDALE BEACH, FL Project Engineer for the reconstruction of one mile of City streets. SW 62 ^d COURT — TOWN OF SOUTHWEST RANCHES, FL Project Engineer— She prepared roadway reconstruction plans and drainage plans. NE 15th AVENUE — CITY OF FORT LAUDERDALE, FL Project Engineer — Responsible for the master plan and public Involvement for a 0.8 mile roadway in Fort Lauderdale, Florida, which included resurfacing plans, marking and signing plans, landscape plans. NW/NE 13th STREET — CITY OF FORT LAUDERDALE, FL Project Engineer — Responsible for the master plan and public Involvement for a 2.1 mile roadway in Fort Lauderdale, Florida, which included resurfacing plans, marking and signing plans, landscape plans. C -4 CANAL FLOOD PROTECTION PROJECT, CITY OF SWEETWATER, FL — SOUTH FLORIDA WATER MANAGEMENT DISTRICT Project Engineer for drainage design along C -4 canal north bank and flood protection cut -off wall. W. 771h STREET — CITY OF HIALEAH, FL Project Engineer— She prepared roadway reconstruction plans and drainage plans. W. 371h STREET — CITY OF HIALEAH, FL Project Engineer— She prepared roadway reconstruction plans and drainage plans. W. 33rd STREET PHASES I AND II — CITY OF HIALEAH, FL Project Engineer— She prepared roadway reconstruction plans and drainage plans. W. 741h STREET — CITY OF HIALEAH, FL Project Engineer — She prepared roadway reconstruction plans and drainage plans. ® R.J.Behar R. ]. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 20 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G 1 N E E R I N G S E R V I C E S CARMEN A. APONTE, MSE, CEI DRAINAGE /PERMITTING EDUCATION: M.S. Engineering, Florida International University, April 2000; B.S. Industrial Engineering /Food Engineering, Universidad INCCA Colombia, 1991 REGISTRATIONS: Certified Environmental Inspector PROFESSIONAL AFFILIATIONS: Environmental Assessment Association (EAA) 2000, Member of the Order of the Engineer 1998, Member of the Water Environment Federation, WEF, Member of the American Water Works Association YEARS OF EXPERIENCE: 15 Years YEARS WITH RJ BEHAR: 2002 —Present ENGINEERING EXPERIENCE Ms. Aponte has over 15 years of environmental /water resource experience. In addition she is a certified environmental inspector with expertise in groundwater, hydrologic and hydraulic modeling. At RJ Behar, Ms. Aponte works on environmental and water resource projects, and provides support with hydrologic /hydraulic and water quality modeling. She has significant experience with Phase I and II environmental assessments. RELEVANT EXPERIENCE BATTERSEA AND DOUGLAS ROAD DRAINAGE IMPROVEMENTS — CITY OF MIAMI, FL Drainage Engineer responsible for developing three drainage alternatives and prepared a drainage report for drainage improvements. She was in charge of the entire permitting package. The alternatives included pump station, French drain and deep wells. NW 44th STREET — CITY OF LAUDERDALE LAKES, FL Design Engineer — Designed the drainage system for the roadway including pre vs. post analysis using AdICPR, stormsewer design, spread calculations, water quality ditch design with weir control, culvert life estimation and prepared the drainage report. She also prepared the Environmental Resource Permit Package. NW 87th AVENUE (SR- 973 /GALLOWAY ROAD), MIAMI -DADE COUNTY, FL— FDOT, DISTRICT 6 Project Engineer — She prepared the drainage plans for new construction of a major arterial. The scope includes final design and future new reconstruction, roadway design, traffic operations, drainage, structure and construction. SR -7 /NW 5th STREET - BRIDGE REPLACEMENT, MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6 Drainage Engineer responsible for the drainage plans and Bridge Hydraulic Reports. This project included major utility coordination and large offsite areas discharging throughout the project. Services performed included the Hydrologic /Hydraulic studies, stormwater management design, bridge hydraulics, signing and pavement markings and permit sketch services. DESIGN /BUILD FOR 1.595 FINAL DESIGN, BROWARD COUNTY, FL — FDOT, DISTRICT 4 (AECOM /DRAGADOS) Project Engineer involved with the drainage design for several sections of the corridor. She assisted with the design services for the preparation of construction documents for major freeway improvements in Broward County, Florida. The design tasks include exfiltration trench design, storm sewer design and analysis, and both wet and dry retention stormwater management pond designs. The design involves the use of spreadsheets, ICPR, ASAD and Microstation. SR- 997 /KROME AVENUE, BRIDGE HYDRAULIC REPORT, MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6 Project Engineer — She designed the drainage hydraulic alternatives for the bridge crossing the Miami Canal C -6 at SR- 997 Krome Avenue, using the HEC -RAS model. The SR -997 (Krome Avenue) Bridge crossing over the Miami Canal (C- 6) (Existing Bridge No. 870134) was replaced with one northbound and one southbound road bridge. RJ Behar was contracted by the FDOT to perform the hydraulic and scour analyses and prepare the Bridge Hydraulic Report for the project. US- 1 /SR -5, ST LUCIE COUNTY, FL — FDOT, DISTRICT 4 Drainage Designer — She prepared the right -of -way occupancy permitting package and NPDES SWPPP plan preparation 1 -75 /GRIFFIN ROAD INTERCHANGE — BROWARD COUNTY, FL Drainage /Permitting Engineer — The scope of the project included design modifications to the interchange drainage, which included modification of inlets and existing pipes, new control structures within the existing ponds to provide treatment of additional impervious areas and modification of the existing ponds /detention areas. ® R.j.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 121 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S NORTH BROWARD COUNTY NEIGHBORHOOD IMPROVEMENT — BROWARD COUNTY WATER & WASTEWATER DEPARTMENT Drainage Engineer — She was in charge of designing, and proposed installation of a comprehensive stormwater management system, for a portion of the North Broward County Neighborhood Improvement Project (NCNIP). This project included assessment of the existing drainage system, identifying problem areas, and offering a suitable solution for existing flood problems. She also prepared the permit package including SFWMD, FDOT and Broward County. DISTRICT ENGINEERS PERMIT REVIEWS — CENTRAL BROWARD WATER CONTROL DISTRICT Technical Support — Provided hydrologic - hydraulic expertise and reviewed technical issues regarding proposed projects SHADY BANKS /SEPTIC AREA NUMBER 5 — CITY OF FORT LAUDERDALE, FL Project Engineer for the conversion of a septic system community to a sanitary sewer system. She also prepared the water permit package. SISTRUNK BOULEVARD FROM FEDERAL HIGHWAY TO 27th AVENUE — CITY OF FORT LAUDERDALE, FL Project Engineer who prepared contract documents for over 2 miles of new water lines; prepared all the design calculation, cost estimates specifications and water permit package. HOLLYWOOD BOULEVARD (SR -820) FROM SR -A1A TO US -1 — FDOT DISTRICT 4 Drainage Engineer - Ms. Aponte worked on the design of drainage improvements for the project. TURNPIKE WIDENING JOHNSON STREET TO GRIFFIN ROAD — FDOT TURNPIKE ENTERPRISE Drainage Engineer — This project was to widen the Turnpike mainline from 6 to 8- lanes. This project involved milling, resurfacing and widening of the Turnpike, which included the Stormwater Management design of all surrounding area of this highway portion and the highway itself. Ms. Aponte worked on the drainage design and permitting packages. KROME AVENUE BRIDGE HYDRAULIC REPORT (BHR) MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6 Hydraulic Analysis — She designed drainage Hydraulic alternatives for the bridge crossing the Miami Canal C -6 at SR- 997 Krome Avenue using the HEC -RAS model. NAUTILIUS NEIGHBORHOOD IMPROVEMENTS — CITY OF MIAMI BEACH, FL Drainage Designer — She performed Hydraulic modeling using AdICPR model for design of storm sewer and injection wells systems. MIRAMAR CANAL SYSTEM EVALUATION — CITY OF MIRAMAR, FL Project Engineer — She performed the site evaluations to determine the existing conditions of the canal system. She evaluated the drainage basin, siltation and deterioration of seawalls. Ms. Aponte performed basin evaluation using the AdICPR model. She studied the canal system interaction with the TURNPIKE /HEFT interchange drainage system. ESTERO BAY NUTRIENT LOAD ASSESSMENT — SOUTH FLORIDA WATER MANAGEMENT DISTRICT Ms. Aponte assessed and developed a nutrient load assessment model for planners, regulators and local stakeholders to evaluate various alternatives to protect and enhance water quality within the basin and related impacts on Estero Bay using the WAMView model. CENTRAL BROWARD WATER CONTROL DISTRICT ENGINEER SERVICES — BROWARD COUNTY, FL Drainage Engineer — She is responsible for the district reviews of drainage, engineering and as -built plans. Responsibilities for plans review involves ensuring that the Central Broward Water Control District ( CBWCD) engineering criteria is met and provide review comments as necessary. Site visits are performed as necessary. Coordination is maintained with CBWCD in order to ensure that site development requirements are met. ASSESSMENT OF WATER MANAGEMENT PRACTICES WITHIN THE FOUR PRIORITY BASINS OF THE LAKE OKEECHOBEE WATERSHED — SOUTH FLORIDA WATER MANAGEMENT DISTRICT Project Engineer for the assessment of BMP's for different land uses within the Lake Okeechobee Watershed for the reduction of phosphorus using the WAMView model. NW 7th /9th AVENUE CONNECTOR, PROJECT DEVELOPMENT & ENVIRONMENTAL STUDY — CITY OF FORT LAUDERDALE, BROWARD COUNTY, FL/FDOT, DISTRICT 4 Environmental Engineer — She performed the re- evaluation of the contamination screening and evaluation report in accordance with FDOT /PD &E 23 CFR 771. The re- evaluation identified significant environmental impacts, which may have changed after previous environmental reports. Conclusions and recommendations were also provided in order to continue to the next project phase or Phase II of the Environmental Assessment before project execution. NW 107th AVENUE FEASIBILITY STUDY — MIAMI -DADE COUNTY, FL Environmental Engineer — The purpose of the study was to provide an evaluation of feasibility for extending the NW 10711 Avenue corridor from the northern terminus at NW 138th Street to NW 1061h Street. Ms. Aponte performed the analysis and evaluation of the existing environmental conditions and provided recommendations for mitigation. 1 R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 22 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S SANDRA SEQUEIRA, MS, El DRAINAGE/PERMITTING EDUCATION: M.S. Civil and Environmental Engineering — University of Washington, 2001; B.S. Civil Engineering University Nacional de Ingenieria, Managua, Nicaragua, 1995 PROFESSIONAL REGISTRATIONS: E.I. Florida No. 1100011787/2007 TRAINING /CERTIFICATIONS: YEARS OF EXPERIENCE: 10 Years YEARS WITH RJ BEHAR: 2008 —Present ENGINEERING EXPERIENCE Ms. Sequeira is a civil engineer with ten years of experience in civil engineering, drainage design, and construction management. Her graduate degree has provided her with the skills required for civil and environmental engineering. RELEVANT EXPERIENCE SR -836 EMERGENCY ACCESS RAMP, MIAMI -DADE COUNTY, FL — MDX Project Engineer involved in the preparation of storm drainage construction documents, drainage report and permitting. She was in charge of the stormwater design services required for the new drainage system through the use of solid pipes, catch basins, manholes, existing dry retention ponds and existing ditches. The analysis of the proposed drainage condition was done with ICPR, which also involved the use of spreadsheets and Microstation. NORTH COUNTY NEIGHBORHOOD IMPROVEMENT PROJECT — BROWARD COUNTY, FL Project Engineer in charge of drainage design and permitting. WATER AND SEWER IMPROVEMENTS UAZ 303 — BROWARD COUNTY WATER & SEWER Project Engineer responsible for permitting — The scope of this project consists of design and preparation of the construction documents for complete replacement of the water distribution system, upgrading the water transmission system and providing a new sanitary sewer system with pump station upgrades. SR- 836/SR -826 (SECTION 5) PLANS REVIEW — MDX (EAC CONSULTING, INC.) Project Engineer involved with plans review related to drainage plans and reports. DESIGN /BUILD FOR 1.595 FINAL DESIGN, BROWARD COUNTY, FL — FDOT, DISTRICT 4 (AECOM /DRAGADOS) Project Engineer involved with drainage design for several sections of the corridor. Design tasks include exfiltration trench design, storm sewer design and analysis, and both wet and dry retention stormwater management pond designs. The design involves the use of spreadsheets, ICPR, ASAD and Microstation. SR -849 (NW 31St AVENUE) — FDOT, DISTRICT 4 (SUBCONSULTNAT TO: SANCHEZ - ZEINALI & ASSOCIATES, INC.) Project Engineer responsible for the preparation of storm drainage improvements design and construction documents. SW 328th STREET FROM SW 152nd AVENUE TO SW 137th AVENUE — MIAMI -DADE COUNTY PUBLIC WORKS Project Engineer — Responsible for the preparation of storm drainage construction documents and drainage reports. She was in charge of the stormwater design services required for a new drainage system through the use of exfiltration trenches, catch basins, manholes and swales adjacent to the road. The analysis of the proposed drainage condition was done with ]CPR software. SR- 814 /ATLANTIC BOULEVARD (FROM WEST OF SR- 5 1US -1 TO SR -A1A) BROWARD COUNTY, FL — FDOT, DISTRICT 4 Project Engineer involved with plans review related to drainage plans and reports. SR -710 JOHN MONAHAN BRIDGE REPLACEMENT — FDOT, DISTRICT 4 (BCC ENGINEERING, INC.) Project Engineer involved in the Design -Build proposal. She was in charge of the stormwater design services required for the proposed drainage system through the use of dry retention ponds, catch basins, manholes and swales adjacent to the road. The analysis of the proposed drainage condition was done with ICPR, which also involved the use of spreadsheets and Microstation. HOLLYWOOD BOULEVARD (SR -820) FROM SR -A1A TO US -1- 3R — FDOT, DISTRICT 4 Project Engineer— Responsible for Quality Control of drainage modifications from SR -A1A to US -1. ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 123 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S ANDREA RAMUDO, ME, El, LEED AP HIGHWAY DESIGN EDUCATION: M.E. Civil, Environmental & Water Resources Engineering, Cornell University, 2011; B.S. Civil Engineering, Florida Atlantic University, May 2008 PROFESSIONAL REGISTRATIONS: E.I. Florida License No. 1100012945, 2008; LEED Accredited Professional 2008 TRAINING /CERTIFICATIONS: FDOT Specifications Package Preparation Training for Consultants YEARS OF EXPERIENCE: 5 Years YEARS WITH RJ BEHAR: 2011 —Present ENGINEERING EXPERIENCE Ms. Ramudo has over five years of experience as a civil and environmental engineer. At RJ Behar, she is working with design and plans preparation for miscellaneous civil and site engineering projects. Ms. Ramudo has successfully managed large -scale roadway and bridge rehabilitation projects for the Florida Department of Transportation (FDOT). She has also performed engineering analysis of contract plans, specifications and develops alternative solutions for the client for cost - saving benefits. She is very knowledgeable working with GIS, Oracle Primavera Project Mgt P6, and Oracle Primavera Project Planner P3.1, various H &H modeling software, and optimization and linear programming modeling software such as LINGO. RELEVANT EXPERIENCE SR- 5 /US -1 /OVERSEAS HIGHWAY (FROM FONTAINE DRIVE TO S. OF TAVERNIER CREEK BRIDGE) MONROE COUNTY, FL — FDOT, DISTRICT 6 Project Engineer — She is responsible for the design, permitting and construction administration services. The scope of services includes milling and resurfacing, signing and pavement markings, traffic control plans and ADA and pedestrian features upgrades. The project access management analysis resulted in the closure of several unnecessary driveways. Enhanced traffic signal signage was required due to a high rate of accidents at the corridor's one signalized intersection. Additionally the Typical Section was modified to accommodate bicycle lanes without widening. NW 71h /91h AVENUE CONNECTOR (DESIGN) — CITY OF FORT LAUDERDALE, FL Project Engineer for the design of a 1.5 mile new alignment urban roadway in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing pavement marking and permitting as well as public involvement coordination. SR -7 /US -441 ROADWAY LIGHTING AND NW 111h PLACE PEDESTRIAN LIGHTING IMPROVEMENTS, CITY OF LAUDERHILL, FL — FDOT, DISTRICT 4 LAP PROJECT Project Engineer responsible for the design, quality assurance reviews of the plans, permitting and coordination with respective agencies. Once construction begins, Ms. Ramudo, will be responsible for the construction administration and quality assurance of the project to ensure the improvements are constructed in accordance with the design. The scope of this project includes milling and resurfacing, installation of decorative stamped concrete and asphalt, lighting, landscaping, and street furniture. This is a FDOT Local Agency Program (LAP) Project. Project length: 0.45 miles NW 141h STREET CONCEPT PROJECT MANAGEMENT — MDX (EAC CONSULTING, INC.) Project Engineer responsible for coordinating the design services and construction administration between EAC /MDX and the design consultant. This project consists of ramp widening and improvements for the SR -836 off ramp for NW 14th Street and upon completion will help to alleviate the traffic entering into the University of Miami. INDIAN STREET BRIDGE AND ROADWAY PLANS REVIEW — FDOT, DISTRICT 4 Project Engineer responsible for the design, quality assurance reviews of the plans, permitting; with respective agencies, and construction administration services for the coordination of the construction. The scope of this project includes roadway improvements, lighting, and landscaping of a portion of Indian Street. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 24 C I T Y OF S U N N Y I S L E S B E A C H T R A F F 1 C E N G I N E E R I N G S E R V I C E S ROHAN PUNIT, El HIGHWAY DESIGN EDUCATION: M.S. Civil Engineering, University of Florida, Gainesville, Florida 2009; B.S. Civil Engineering, Minor In Business Administration University of Florida, Gainesville, Florida 2007 PROFESSIONAL REGISTRATIONS: Engineer Intern Florida License No. 1100011628, 2007 TRAINING /CERTIFICATIONS: FDOT Specifications Package Preparation Training for Consultants YEARS OF EXPERIENCE: 3Years YEARS WITH RJ BEHAR: 2008— Present ENGINEERING EXPERIENCE Mr. Punit has been involved in the design process of industrial, residential, and commercial land development projects, in both the public and private sectors. He has assisted with the design of various stormwater systems, grading schemes, site plan designs and roadway projects. In addition to his land development experience, his construction field experience includes erosion and environmental control monitoring. Mr. Punit has used both AutoCAD and Microstation to aid in the design of numerous projects. At RJ Behar, he is responsible for support in the areas of design and permitting for multiple projects. These projects range from municipal to federal, with job duties including site and drainage design, plan revisions, and utility and project coordination. Mr. Punit has three years of experience. RELEVANT EXPERIENCE MIAMI RIVER GREENWAYS, SEGMENT D — CITY OF MIAMI, FL Project Engineer — He assisted with the roadway design including drainage improvements, signing and marking, as well as lighting design. The project consists of the reconstruction of an existing roadway segment along the Miami River to produce a scenic, landscaped, pedestrian /bicycle walkway /greenway. The project includes the design of a drainage system with wells, decorative lighting and landscape /hardscape design. SR- 5 /US -1 /OVERSEAS HIGHWAY FROM FONTAINE DRIVE TO S. OF TAVERNIER CREEK BRIDGE, MONROE COUNTY, FL — FDOT, DISTRICT 6 Project Engineer responsible for the design and permitting — The scope of services includes milling and resurfacing, signing and pavement markings, traffic control plans and ADA and pedestrian features upgrades. Enhanced traffic signal signage was required due to a high rate of accidents at the corridor's one signalized intersection. Additionally, the Typical Section was modified to accommodate bicycle lanes without widening. NW 87th AVENUE (SR- 973 /GALLOWAY ROAD) MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6 Project Engineer — He assisted with the roadway plans preparation and drainage plans. The scope consisted of new construction of NW 871h Avenue (from NW 741h Street to NW 103rd Street) within the Town of Medley in Florida. SR -7 /US -441 ROADWAY LIGHTING AND NW 11TH PLACE PEDESTRIAN LIGHTING IMPROVEMENTS, CITY OF LAUDERHILL, FL— FDOT, DISTRICT 4 LAP PROJECT Project Engineer responsible for the design, quality assurance reviews of the plans, permitting and coordination with respective agencies. The scope of this project includes milling and resurfacing, installation of decorative stamped concrete and asphalt, lighting, landscaping, and street furniture. This is a FDOT Local Agency Program (LAP) Project. E. 1St AVENUE, E. 47th STREET, E. 48th STREET- RECONSTRUCTION — CITY OF HIALEAH, FL Project Engineer for the design and production of roadway, drainage, signing and pavement marking plans. PALM AVENUE (FROM WEST 45th STREET TO WEST 47th STREET) CITY OF HIALEAH, FL Project Engineer — He assisted with the roadway improvement plans, milling and resurfacing, drainage, signing and pavement markings as well as lighting plans The scope of this project consisted of roadway improvements, milling and resurfacing, drainage, signing and pavement markings and lighting plans on Palm Avenue from West 45th Street to West 47th Street in the City of Hialeah. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 125 J C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R 1 N G S E R V I C E S PALM AVENUE (FROM WEST 47th STREET TO WEST 49th STREET) CITY OF HIALEAH, FL Project Engineer — He assisted with the roadway improvement plans, milling and resurfacing, drainage, signing and pavement markings as well as lighting plans The scope of this project consisted of roadway improvements, milling and resurfacing, drainage, signing and pavement markings and lighting plans on Palm Avenue from West 47th Street to West 49th Street in the City of Hialeah. E. 4th AVENUE IMPROVEMENTS — CITY OF HIALEAH, FL Field Services Engineer — This project is part of the American Recovery and Reinvestment Act (ARRA), which is supported by federal funds. The project consisted of extensive field work in order to locate roadway deficiencies over the project's 21 block span. ADA improvements curb and sidewalk repairs, utility locations, roadway repairs and signing and pavement marking repairs were some of the aspects documented for this project. NW 7th/9th CONNECTOR (DESIGN) — FORT LAUDERDALE, BROWARD COUNTY, FL Project Engineer for the design of a 1.5 mile new alignment urban roadway in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing pavement marking and permitting as well as public involvement coordination. ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 26 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S MARCEL ORTNER, El SIGNING, PAVEMENT MARKING & CHANNELIZATION EDUCATION: M.S. Ocean Engineering, Florida Atlantic University, Boca Raton, Florida; B.S. Civil Engineering, Florida International University, Miami, Florida, 2008 REGISTRATIONS: E.I. Florida No.1100012555, April 2008 YEARS OF EXPERIENCE: 3Years YEARS WITH RJ BEHAR: 2009— Present ENGINEERING EXPERIENCE Mr. Ortner has three years of experience working on water resource projects. He was a research assistant for South Florida Water Management District, evaluating a geosynthetic product for the mitigation of damaged canals. He is knowledgeable in existing engineering software tools. Mr. Ortner has worked with Bentley WaterGEMS as part of a wastewater model, for Collier County. He studied in Switzerland, with a focus on water resources and geotechnical engineering. Mr. Ortner has experience working with public and private sector clients. RELEVANT EXPERIENCE SR -838 (SUNRISE BOULEVARD) NW 27th AVENUE, BROWARD COUNTY, FL — FDOT DISTRICT 4 Project Engineer in charge of the design and production of roadway, signing, pavement marking and signalization plans. The scope of this project is milling and resurfacing with minor signal modifications and a safety review. SR -838 (SUNRISE BOULEVARD) NW 31St AVENUE BROWARD COUNTY, FL — FDOT DISTRICT 4 Project Engineer in charge of the design and production of roadway, signing, pavement marking and signalization plans. The scope of this project is, road widening to add an additional left turn lane, with safety improvements, milling and resurfacing. SR- 820 /PINES /HOLLYWOOD BOULEVARD FROM EAST OF 64th WAY TO WEST OF SR -7, BROWARD COUNTY, FL — FDOT DISTRICT 4 Project Engineer in charge of the design and production of roadway, signing, pavement marking and signalization plans. The scope of work includes milling and resurfacing the existing pavement; upgrading roadway signs and curb ramps to meet current standards, improving pedestrian and signal features, and signal features and Landscape improvements. DESIGN /BUILD P3 FOR 1 -595 FINAL DESIGN, BROWARD COUNTY, FL — FDOT DISTRICT 4 (AECOM /DRAGADOS) Project Engineer, assisted with plan preparation for the drainage of several corridor sections. Other design tasks involved, exfiltration trench design, storm sewer, and analysis of wet and dry retention of stormwater management pond designs. The design involved the use of spreadsheets, ICPR, ASAD and Microstation. The plans were prepared using ASAD and Microstation software. NE 12th AVENUE REVISION — CITY OF OAKLAND PARK, FL He aided in providing services for the reconstruction of an existing downtown street, which Included removal of asphalt, base and striping of existing roadway, installation of new drainage structures and piping, exfiltration trenches, removal of existing drainage structures and piping, abandonment of existing drainage piping, regrading /resodding of existing roadway swales, pavement tying into existing driveways, abandonment and removal of an existing water main. It also included, setting up a new water main, replacing existing water services, and reconnecting to existing meters. The scope also included improving the roadway pavement, and street -end features, including fountains, to meet the beautification standards of the City. LAND DEVELOPMENT PROJECT — OAKLAND PARK, FL He contributed in providing final design services for a 15 -acre, 186 -unit townhouse development, which included site layout, landscape architecture, lighting, irrigation, paving, grading, drainage, public utilities and associated permitting. The public system design included over 4,000 linear -feet of eight and six inches water main, approximately 2,900 linear -feet of sanitary sewer, and a 20 -Hp lift station to pump a minimum of 426 gpm. The proposed lift station discharges into a proposed eight inch force main, which then discharges into a16 -inch force main. ElR.j.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 27 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G 1 N E E R I N G S E R V I C E S DIMA POE, MS, El TRAFFIC ENGINEERING EDUCATION: M.S. in Transportation Engineering, University of Florida, Gainesville, Florida, 2006; B.S. in Civil Engineering, Florida International University, Miami, Florida 2004 PROFESSIONAL REGISTRATIONS: E.I. Florida License No. 1100009445, 2004 TRAINING /CERTIFICATIONS: 52 Graduate Credits in Urban and Regional Planning, University of Florida, Gainesville, Florida; Software knowledge ArcGIS (ESRI), Cube Voyager, CORSIM, Transyt -7F, Passer II -02, Synchro 4, AutoCAD, SPSS, Microsoft Office Suite (Word, Excel, Power Point, Publisher, etc.), Open Office Suite; Engineers in Training Exam (EIT) or FE; Interdisciplinary Concentration in Geographic Information Systems (ICGIS) Certification course work YEARS OF EXPERIENCE: 4 Years YEARS WITH RJ BEHAR: 2011 —Present ENGINEERING EXPERIENCE Ms. Poe is currently an Engineer Intern. She has one year of transportation and traffic engineering experience. At RJ Behar, Ms. Poe is responsible for traffic and transportation engineering, parking safety studies, land use and transportation planning. RELEVANT EXPERIENCE SR- 874 /DON SHULA EXPRESSWAY RAMP CONNECTOR - PROJECT DEVELOPMENT AND ENVIRONMENT STUDY — METRIC ENGINEERING, INC. /RJ BEHAR Project Engineer — She is assisting with the required traffic engineering analysis and the development of major documents, such as the Interchange Modification Report and the Design Traffic Technical Memorandum. MIAMI DADE COLLEGE — MIAMI, FL Adjunct Faculty Teacher - Intro to Engineering courses — This course requires knowledge of basic engineering principles such as statics, dynamics, ethics, and engineering economics. She is solely responsible for the curriculum taught and for administration of exams, quizzes, and other assignments. COMMUNITY REDEVELOPMENT AREA (CRA) PLAN — CITY OF HAWTHORNE, FL Project Engineer — This was a project to update the Community Redevelopment Area (CRA) Plan for the City of Hawthorne, Florida. She conducted several site visits to collect data by observation as well as from interviews with the commissioners, city employees, and other stakeholders in the community. She was responsible for the Facilities and Service element of the plan; which included assessing and making recommendations on roads, streetscape, parks and open spaces, water and sewer services, and emergency services. Two presentations were made to the City Council and attending townspeople on the findings and recommendations. TRANSPORTATION ELEMENT OF COMPREHENSIVE PLAN UPDATE AND EAR AMENDMENTS — CITY OF ZEPHYRHILLS, FL Traffic Technician — She worked with the Center for Building Better Communities to help small cities with comprehensive plan amendments and updates. She completed a data and analysis report for the transportation element of their comprehensive plan and created all of the supporting materials (such as maps, posters, and brochures) for a transportation charrette held at City Hall in Zephyrhills. She presented the City of Zephyrhills with a traffic circulation element planning framework consisting of the specific goals and objectives that would go into their Evaluation and Appraisal Report. She wrote a summary of events as a case study for a Best Practices in Small City Transportation Guide. RE- DESIGNING ORANGE BOWL STADIUM — MIAMI, FL Student — This design project was to redesign the Orange Bowl in Miami Florida to accommodate both football and baseball venues. She was responsible for the transportation and parking elements of the project. The two main issues to address for this stadium were the traffic congestion caused on game days and the lack of parking causing attendees to park in the nearby residential housing. To alleviate the traffic congestion, Ms. Poe proposed to increase public transportation to the area and integrated an underground metro rail stop at the stadium. To help the parking problem for the stadium, she created four parking garages to be situated around the stadium; these structures would also be the foundation for a retractable roof. The final project was presented to the Mayor of the City of Miami. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 28 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S ALEXANDER SOCARRAS, El TRAFFIC ENGINEERING EDUCATION: B.S. Civil Engineering, Florida International University, Miami, Florida, 2011 PROFESSIONAL REGISTRATIONS: E.I. Florida No.1100015631/July 2011 YEARS OF EXPERIENCE: 4Years YEARS WITH RJ BEHAR: 2007 — Present ENGINEERING EXPERIENCE Mr. Socarras is currently an Engineer Intern. At RJ Behar, he is working with design and plans preparation for miscellaneous civil engineering projects. Mr. Socarras has been involved in numerous traffic count studies. He is very knowledgeable working with Microstation, AutoCAD, Corsim and Synchro software. RELEVANT EXPERIENCE SW 328th STREET FROM SW 152 °d AVENUE TO SW 137th AVENUE — MIAMI -DADE COUNTY PUBLIC WORKS He assisted with the roadway plans preparation. The scope of the project included master planning and feasibility analysis for the new roadway. 1 -75 /GRIFFIN ROAD INTERSECTION TRAFFIC STUDY, BROWARD COUNTY, FL — FDOT, DISTRICT 4 Data Collector — He assisted with the study of signalized intersection analysis, weaving analysis, queuing analysis, interchange capacity analysis and crash analysis using the latest traffic software such as: Corsim, Synchro and FSUTMS /CUBE. The study included signalized intersection analysis, weaving analysis, queuing analysis, ramp analysis, interchange capacity analysis and crash analysis. The study was done using the latest traffic software's such as CORSIM, SYNCHRO and FSUTMS /CUBE. SR -836 WIDENING - TRAFFIC STUDY — MDX (SUBCONSULTANT TO EAC CONSULTING, INC) Technician — He performed the traffic study including 72 hour counts and turning movement counts and compiled the data for the report. SR -80 /SOUTHERN BOULEVARD, PD &E TRAFFIC STUDY — FDOT, DISTRICT 4 (SUBCONSULTANT TO C3TS) Technician — He performed traffic counts and data collection. The Florida Department of Transportation, District 4 and the Federal Highway Administration are considering improvements to SR -80 in Palm Beach County, Florida. SR -874 PD &E STUDY— MDX (METRIC ENGINEERING, INC.) He performed field reviews of 25 intersections; including traffic conditions, road geometry, driver interaction and trip generation. NW 87th AVENUE (SR- 973 /GALLOWAY ROAD) TRAFFIC STUDY, MIAMI -DADE COUNTY, FL— FDOT, DISTRICT 6 The scope of this project included a traffic study; traffic counts were performed to determine the optimal geometrics. Traffic projections, traffic operations and signal warrants for eight intersections were also performed. GRAND PALMS TRAFFIC STUDY — GRAND PALMS, PEMBROKE PINES, FL Traffic Technician — He observed morning and evening turning movement counts to determine the need for additional lanes. This project consisted of performing a traffic study at the Entrance of the Grand Palms Resort and Pines Boulevard, RJ Behar was hired to conduct an intersection analysis for the intersection of Pines Boulevard and Grand Palm Avenue. This study was requested to evaluate the feasibility of adding a right turn lane to the northbound approach. TRANSPORTATION MASTER PLAN TRAFFIC COUNTS — CITY OF HALLANDALE BEACH, FL He performed traffic counts and data collection. This project included 24 hours and turning movement counts for a master plan study aimed at improving congestion within the City of Hallandale Beach. LAND USE AMENDMENT PLAN - TRAFFIC STUDY /TRAFFIC COUNTS — TOWN OF DAVIE, FL He performed traffic counts and data collection. RJ Behar prepared a traffic study, on behalf of the Town of Davie, for a Land Use Plan Application to increase density within the Town's Regional Activity Center. The study includes traffic counts, projections of the new traffic demand, and analysis of the existing and future operational conditions in the areas roadway network. KEYSTONE POINT NEIGHBORHOOD TRAFFIC STUDY — CITY OF NORTH MIAMI, FL He performed traffic counts. RJ Behar was contracted by the City of North Miami to conduct a speed study for the Keystone Point Neighborhood. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 129 C I T Y OF S U N N Y I S L, E S B E A C H T R A F F I C E N G I N E E R I N G S E R V 1 C E S RAFAEL URDANETA, CCM UTILITY COORDINATION EDUCATION: B.S. Civil Engineering, Universidad Rafael Urdaneta Venezuela 1987 CERTIFICATIONS: Florida Certified Construction Manager, CTQP # U63573061: ATSSA YEARS OF EXPERIENCE: 23 Years YEARS WITH RJ BEHAR: 2004— Present ENGINEERING EXPERIENCE Mr. Urdaneta has over 23 years of experience in civil engineering design and construction management projects. He is very knowledgeable in public and private work projects including buildings, wastewater facilities, roadways, utilities, stormwater and drainage systems, water distribution, malls, high rise buildings, petroleum platforms, subdivisions and medical centers as well as hydrologic and hydraulic modeling related to land development projects. Mr. Urdaneta's experience also includes permitting procedures in entities such as the South Florida Water Management District, Broward County, City of Sunrise, City of North Miami Beach, City of Coconut Creek, City of Fort Lauderdale, City of Pembroke Pines, Town of Davie and the City of Austin, Texas. RELEVANT EXPERIENCE EPD (ENVIRONMENTAL PROTECTION DEPARTMENT) LABORATORY GREEN BUILDING — BROWARD COUNTY ENGINEERING Project Engineer — Responsible for the site engineering designs. The scope of this project included drainage design, signage, permitting and utility coordination. FLEET MAINTENANCE FACILITY — MIAMI -DADE COUNTY, FL Project Engineer — Responsible for the site engineering designs. The scope of this project included drainage design, permitting and utility coordination. NW 5th STREET BRIDGE REPLACEMENT — FDOT, DISTRICT 6 Drainage Engineer for drainage design using French drains. This project included major utility coordination, large offsite areas discharging through the project and permitting. NW 441h STREET EXTENSION — CITY OF LAUDERDALE LAKES, FL Project Engineer — He performed the stormwater management and design for the construction of the new roadway and permitting. NW 871h AVENUE EXTENSION — MIAMI -DADE COUNTY, FL Project Engineer — He performed the stormwater management and design for the construction of the new roadway including permitting. NE 33rd AVENUE NEIGHBORHOOD IMPROVEMENT — CITY OF FORT LAUDERDALE, FL Construction Project Manager — This project consisted of reconstruction and improvements of the NW 331d Avenue Neighborhood, from NW 1911 Street to NW 291h Street, which included main water line replacement, drainage improvements, lighting improvements and roadway rehabilitation. Value $ 3,600,000 EMERGENCY WATER MAIN REPAIR — CITY OF PEMBROKE PINES, FL Project Administrator — He was responsible for the full construction management services for the emergency repair of a 16" PVC transmission water main that ruptured along Pines Boulevard, east of 145th Avenue in the City of Pembroke Pines. The project consisted of the replacement of 20 If. of a 16" PVC water main with 16" DIP retrained sleeve pipe, fire hydrant installation for flushing and testing, backfill and compaction following FDOT specifications. The project also included the removal and replacement of two driveways connecting a shopping center with Pines Boulevard including striping and ADA sidewalk ramps. This project was executed as time and material, therefore a meticulous tracking of all contractor activities and final cost estimates were required. PINES BOULEVARD (SR -820) AND 1 -75 (SR -93) INTERCHANGE, CEI — CITY OF PEMBROKE PINES, FL — FDOT, DISTRICT 4 Project Administrator for this $11.2 million Local Agency Program (LAP) project between the City of Pembroke Pines and the Florida Department of Transportation, District 4. This is a federally funded project consisting of urbanized improvements at the 1 -75 (SR -93) and Pines Boulevard (SR -820) Interchange. The project includes modifying the existing interstate overpass, entrance and exit ramps from a rural configuration to an urban configuration, as well as widening, signalization, landscaping and access management improvements along Pines Boulevard. EJR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 30 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S OKEECHOBEE BOULEVARD (SR -714) CEI — PALM BEACH COUNTY, FL Project Administrator responsible for overseeing the roadway construction improvements on Okeechobee Boulevard, between Australian Avenue and Parker /Tamarind Avenue. The improvements under this contract consist of providing a new second left hand turn lane on the west approach to the intersection, an auxiliary lane to allow for eastbound traffic exiting Australian Avenue to enter and merge onto Okeechobee Boulevard, a right turn lane to provide westbound traffic turning onto Australian Avenue, milling and resurfacing of existing pavements, drainage improvements, sidewalks, a new combined traffic /rail signal system, lighting, signing and pavement markings, and tree relocation. The typical section consists of a 6 -lane urban divided arterial with curb and gutter approaching the CSX/Tri -Rail at -grade gated crossing. Signal and crossing gates will be installed by CSX's Railroad contractor and coordinated with the County's roadway approach and joint signal installations. Project length: 0.3 miles . W. 36th AVENUE (FROM WEST 76th STREET TO WEST 84th STREET) CEI — CITY OF HIALEAH, FL; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Project Administrator — He was responsible for overseeing the reconstruction of West 361h Avenue from West 76th Street to West 84th Street within the City of Hialeah. The general overview and scope for this project comprised of the complete reconstruction of West 36th Avenue, including new sidewalk, curb and gutter, drainage improvements - new drainage inlets, 18" storm sewer cross drainage pipe, 1,271 LF of 18" exfiltration trench (French drain). The project scope also included pavement milling and resurfacing, signing and pavement markings, street lighting, tree removal, and grading of the adjacent swale areas and sod restoration with Performance Turf. Project length: 0.5 miles W. 53rd STREET (FROM W. 411 AVENUE TO W. 81h AVENUE) CEI — CITY OF HIALEAH, FL; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Project Administrator for the West 53rd Street ARRA- Funded reconstruction projects within the City of Hialeah. The general overview and scope for this project comprised the complete reconstruction of West 5314 Street, including new sidewalk, curb and gutter, drainage improvements - new drainage inlets,18" storm sewer cross drainage pipe, 18" exfiltration trench (French drain). Proposed in the project scope are pavement milling and resurfacing, signing and pavement markings and grading of the adjacent swale areas and sod restoration with Performance Turf. W. 53rd STREET (FROM W. 8th AVENUE TO W. 121h AVENUE) CEI — CITY OF HIALEAH, FL; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Project Administrator for the West 53rd Street ARRA- Funded reconstruction projects within the City of Hialeah. The general overview and scope for this project comprised the complete reconstruction of West 53,d Street, including new sidewalk, curb and gutter, drainage improvements - new drainage inlets,18" storm sewer cross drainage pipe, 18" exfiltration trench (French drain). Proposed in the project scope are pavement milling and resurfacing, signing and pavement markings and grading of the adjacent swale areas and sod restoration with Performance Turf. Project length: 0.5 miles CONSTRUCTION MANAGEMENT OVERSIGHT — CITY OF LAUDERDALE LAKES, FLORIDA Project Administrator — This project consisted of construction of "The Island "at Veteran's Memorial Park located at the intersection of SR -7 and SW 361h/371h Street. RJ Behar advised the City of Lauderdale Lakes during construction and worked with the City to close out the project. Also, RJ Behar helped the City obtain FDOT certification for Local Agency Program (LAP) funding for this project as well as other capital improvement projects before construction. RIVERWALK SOUTH REGIONAL PARK RESIDENT PROJECT REPRESENTATIVE — CITY OF FORT LAUDERDALE, FL "CITY OF FORT LAUDERDALE COMMUNITY APPEARANCE AWARD — MAY 8TH 2008" (CATEGORY 6.02) Construction Project Manager — This project consisted of reconstruction and improvements to a portion of the Riverwalk Regional Park between SE 3rd Avenue and Andrews Avenue, which included a new fire line, new vacuum sewer line, replaced overhead utilities to underground, installed 14 new marine power stations and evacuation pedestals, replaced the existing two -way road with a one -way paver road, coordinated seawall repair, new tropical landscaping and a new lighting system. Value $ 3,000,000. 1-75/PINES BOULEVARD BRIDGE DECK REPAIR, CITY OF PEMBROKE PINES, FL — FDOT DISTRICT 4 Project Administrator /Senior Inspector — Inspector responsible for overseeing the demolition and reconstruction of the concrete bridge deck on Pines Boulevard (SR -820) over the 1 -75 (SR -93) Interchange within the City of Pembroke Pines. The improvements under this contract consist of the removal and demolition of the existing concrete bridge deck to a depth of 3.5 inches, or Y2 inch below the top mat of reinforcing steel, sandblasting, check for steel deterioration, and re- install /splice new reinforcing steel as necessary; and final placement, casting, and curing of the new concrete overlay deck. Project length: 0.2 miles. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 31 C I T Y OF S U N N Y I S L E S B E A C H T R A F F 1 C E N G I N E E R I N G S E R V I C E S NANETTEAKYAZ HIGHWAY DESIGNISIGNING, PAVEMENT MARKING & CHANNELIZATION EDUCATION: A.A. Degree, Broward Community College, Davie, Florida, 1992 PROFESSIONAL REGISTRATIONS: Not Applicable TRAINING /CERTIFICATIONS: 2002 FDOT CAD Update Training Seminar; 2002 FDOT PPM Design Update Training; Florida International University - AutoCAD Release 12; FDOTTICE - Load and Resistance Factor Design (LRFD) Training; Geopak Road 1 Training YEARS OF EXPERIENCE: 10 Years YEARS WITH RJ BEHAR: 2001 —Present ENGINEERING EXPERIENCE At RJ Behar, Ms. Akyaz is responsible for plans preparation in both MicroStation and CAD software for roadway and civil engineering projects. She has 12 years of experience in plans preparation on civil engineering projects. RELEVANT EXPERIENCE EAST 4th AVENUE STREET ASSESSMENT — CITY OF HIALEAH, FL Responsible for the drafting of driveways, sidewalks and ADA ramps; curb and gutter, drainage, pavement, and utilities. The scope consisted of General engineering services for the assessment of sidewalks, ADA compliance and cost estimate for repairs or reconstruction of sidewalks of two segments of this roadway; from Hialeah Drive to East 216t Street and from East 32nd Street to East 53rd Street. DESIGN /BUILD FOR THE RECONSTRUCTION OF SE 3rd STREET, BELLE GLADE, FL — FDOT DISTRICT 4 Project Designer responsible for the production of roadway plans, signing and pavement marking plans and quantities for this design /build project. The scope of this project included roadway plans, drainage design, signing & marking plans and utility relocation plans. The design included the use of filter fabric and a thick sub -base in lieu of demucking the roadway. POWERLINE ROAD (SR -845) PALM BEACH COUNTY, FL — FDOT DISTRICT 4 Project Engineer responsible for the preparation of roadway quantities, computation book and transport input. The scope included complete design for widening and resurfacing of 3 miles of a major arterial roadway, including; drainage design, pavement marking and signing, overhead signing plans, lighting plans, seven signal locations, structural plans (bridge widening), a public involvement program and landscape improvements. The project also included a safety analysis and a signal assessment analysis. SR -A1A (FROM COUNTY ROAD TO FLAGLER MEMORIAL BRIDGE) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 Roadway Designer — The project consisted of milling and resurfacing of 0.25 miles of a 4 -lane divided highway for FDOT, District 4). She was responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility relocation, as well as, the design and drafting of signing and markings and lighting plans including lighting calculations. She was in charge of the quantities input in the FDOT CES system. 1 -75 /GRIFFIN ROAD INTERCHANGE, BROWARD COUNTY, FL — FDOT DISTRICT 4 Roadway Designer — The scope consists of improvements including modifications to the interchange by realigning the 1 -75 ramps to converge at a new signalized intersection. Her responsibilities include the geometrics, signing and pavement markings, signalization and long range estimates. NW 146th STREETINORTH MIAMI AVENUEIS RIVER DRIVE — MIAMI -DADE COUNTY, FL Roadway Designer — She assisted in the preparation of layout and final construction plans for a roundabout based on Miami -Dade County roadway design criteria in the City of North Miami. The roundabout connects N. Miami Avenue, South River Drive and NW 146th Street. The purpose of the project was to provide traffic calming in this neighborhood. NORTHLAKE BOULEVARD OVER THE LOXAHATCHEE SLOUGH — PALM BEACH COUNTY, FL Roadway Designer — The project consisted of reconstruction of a four lane divided highway, construction of a bridge, weir and walkway. She was responsible for the geometrics, signing and pavement markings, weir placement and grading of the channel and walkway, quantity calculations and cost estimates. E] R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 32 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G 1 N E E R 1 N G S E R V I C E S PALM AVENUE (W. 45th STREET TO W. 47th STREET) — CITY OF HIALEAH, FL Roadway Designer - She prepared the plans for milling and resurfacing Palm Avenue from East 451h Street to East 47th Street. The project also included adding curb ramps to comply with ADA standards, replacing sidewalk, driveways and curb and gutter as needed, cleaning, sealing and adjusting drainage manholes and inlets and signing and pavement markings US-1/SR-5 - ST. LUCIE COUNTY, FL — FDOT, DISTRICT 4 Roadway Designer— Responsible for the signalization plans. 1.95 PUMP STATION, PEMBROKE PARK, FL— FDOT, DISTRICT 4 Roadway Designer— She prepared the roadway plans for reconstruction of 3011 Avenue. US-1/SR-5, MIAMI -DADE COUNTY LINE TO HALLANDALE BEACH BOULEVARD — FDOT, DISTRICT 4 Roadway Designer — She prepared the typical section package and quality control review. SR -80 CRESTWOOD TO 105th AVENUE — FDOT, DISTRICT 4 Roadway Designer — She prepared the roadway, signing and marking and drainage plans. TOWN CENTER ROADWAY STUDY — CITY OF CORAL SPRINGS, FL Roadway Designer — She prepared layouts of the bus stations and connecting roadways for transit improvements. MILANDER PARK STREETSCAPE — CITY OF HIALEAH, FL Roadway Designer — She prepared master plans for East 47th and East 48th Street from Palm Avenue to East 1St Avenue. WILDE PARK — CITY OF HIALEAH, FL Roadway Designer — She prepared the site, paving and drainage design plans. BUCKY DENT PARK DESIGN — CITY OF HIALEAH, FL Roadway Designer — Responsible for the design to address flooding problems at the park. WEST 37th STREET — CITY OF HIALEAH, FL Roadway Designer — Responsible for the roadway plans for reconstruction of W 37th Street. E. 6th AVENUE (FROM E. 9th STREET TO HIALEAH DRIVE), E. 5th STREET (FROM E. 4th AVENUE TO E. 6th AVENUE), E. 5th STREET (FROM E. 6th AVENUE TO E. 8th AVENUE) — CITY OF HIALEAH, FL Roadway Designer — She was responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility relocation, as well as the design and drafting of signing and markings plans and lighting including lighting calculations. E. 1 St AVENUE — CITY OF HIALEAH, FL Roadway Designer — She prepared roadway plans, drainage design, signing and marking, signal plans, conversion of overhead to underground utilities. The project consisted of the reconstruction of 1.6 miles of City Street, conversion from one -way to two -way traffic. E. 10th, 11th, 12th, 13th, 14th, 15th STREET (FROM PALM AVENUE TO EAST 1St AVENUE) — CITY OF HIALEAH, FL Roadway Designer - Prepared roadway plans, drainage design, signing and marking. The project consisted of reconstruction of approximately 3700 feet of City Street. E. 10th, 11th, 12th, 13th, 14th, 15th (FROM EAST 1stAVENUE TO EAST 2nd AVENUE) — CITY OF HIALEAH, FL Roadway Designer — She prepared roadway plans, drainage design, signing and marking and utility coordination. The project consists of reconstruction of 3,700 feet of City Street. E. 16th, E. 17th E. 18th 19th, 20th (FROM PALM AVENUE TO EAST 1St AVENUE) — CITY OF HIALEAH, FL Roadway Designer — She was responsible for the roadway plans, drainage design, signing and marking and utility coordination. The project consists of reconstruction of 3,000 feet of City Streets. E. 16th 18th 19th, 20th STREET, CURTIS DRIVE (FROM EAST 1st AVENUE TO EAST 2nd AVENUE) — CITY OF HIALEAH, FL Roadway Designer — She prepared roadway plans, drainage design, signing plans, utility coordination. The project consisted of reconstruction 3700 feet of City Streets. ElR.).Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 33 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S RICHARD BOLT UTILITY COORDINATION EDUCATION: B.S. Building Construction, Auburn University, AL, 1978 REGISTRATIONS: SBCCI Building Inspector; P.E. Maryland No.14562; P.E. Virginia No. 16025; P.E. District of Columbia, No. 8214 TRAINING: Design of Roadway Drainage Systems- Advanced Geotech Systems 2003 (.6 CEU's) YEARS OF EXPERIENCE: 30 Years YEARS WITH RJ BEHAR: 2003 —Present ENGINEERING EXPERIENCE Mr. Bolt has extensive multi - disciplined experience in; civil, structural, and construction engineering and administration, architectural design, inspections, general contracting and custom computer applications. Mr. Bolt's responsibilities comprise of: construction management and observations, Computer -Aided Design (CAD), calculations for site layout, grading and paving, storm drainage, water systems and sanitary sewer systems. In addition, Mr. Bolt reviews shop drawing submittals, to be in compliance with construction documents, performs field inspections in order to monitor contractor performance, and estimates construction costs. During his career, his successful completion of numerous municipal projects, demonstrates his skillful and effective management for difficult and complex projects. RELEVANT EXPERIENCE POWERLINE ROAD (SR -845) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 Project Engineer in charge of a 3 mile RRR project which involved utility coordination, procurement of utility schedules, color -coded plans and utility cost estimates. The scope of the project consisted of complete design of widening and resurfacing three miles of a major arterial roadway, including drainage design, pavement marking and signing, overhead signing plans, lighting plans, seven signal locations, major culvert (72 -inch) replacement, structural plans (bridge widening) and deck replacement, public involvement program and landscape improvements. The project installed 8 major signalized intersections with galvanized mast arms. Signal analysis and new signal timings were developed using the Synchro model. SR -AIIA, PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 Project Engineer — He was responsible for the utility coordination, and contacts for a 5 mile RRR project. The project included a major drainage study and improvements, milling and resurfacing, bridges, signal improvements, signing and marking plans. This project required coordination with endangered species and seagrass surveys, preservation of two historical properties, and coordination of impacts to 4F (Boynton Beach Inlet park) properties. A coastal construction line was obtained, as well as an agreement with the Fish and Wildlife Commission, for the safety of any impact to sea turtles, from the proposed lighting design. He prepared the maintenance of traffic plans. EPD (ENVIRONMENTAL PROTECTION DEPARTMENT) LABORATORY GREEN BUILDING — BROWARD COUNTY ENGINEERING Civil Engineer — The scope included drainage design, signage, permitting, and utility coordination. OLIVE AVENUE WATER AND SANITARY SEWER REPLACEMENT PROJECT — CITY OF WEST PALM BEACH, FL Project Manager — Designed the complete replacement and upgrade of the water and sanitary sewer system, on a 1.5 mile urban section of Olive Avenue, starting from Lakeview Avenue and ending at Palm Beach Lakes Boulevard in the downtown area. The project was performed under a joint project agreement between the city of West Palm Beach and FDOT during the reconstruction of the roadway. The utility coordination involved with this project was very complex owing to the density of utilities in this older urban section of the downtown. US -27 MILLING AND RESURFACING DESIGN BUILD — FDOT, DISTRICT 4 Project Engineer responsible for an FDOT mill and resurfacing design build project, for US -27, from Dade /Broward county line north of Griffin Road. The project included widening a section for an acceleration lane, signing and pavement marking upgrades and several signal and lighting improvements. ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 34 C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G I N E E R 1 N G S E R V I C E S W. 29th STREET 3R SAFETY REVIEW (FROM OKEECHOBEE ROAD TO W. 4th AVENUE) — CITY OF HIALEAH, FL Project Engineer — The fast -track project was a 1.5 mile section of roadway being rehabilitated under the "stimulus" plan. Mr. Bolt performed visual site inspections of the roadway, to evaluate the condition, and recommend reconstruction of concrete curbs, gutters, sidewalks, driveways and handicap ramps. The evaluation also entailed a small amount of asphalt pavement, and concrete drainage structures. Along with the site evaluations, the work included, writing repair or reconstruction design specifications, assisting with the development of construction documents, and preparation of the bid package. PERMIT REVIEW AND INSPECTIONS — TOWN OF SOUTHWEST RANCHES, FL As part of the Town Engineer services, he performed reviews and inspections of all building permits and fill permits for site -work, grading and drainage. He performed final inspection of all permitted work, to ensure conformance to plans. FACADE IMPROVEMENT AT SUNSET STRIP PROJECT — CITY OF SUNRISE, FL Engineer — Designed a Civil /Site plan for a $2.2 million project, which included roadway milling, resurfacing and brick pavers along Sunset Strip, between NW 641h and NW 681h Avenues. It also included parking facilities and coordination with the construction of architectural facade improvements. PRIVACY WALL PROGRAM AT NW 1361h AVENUE AND FLAMINGO ROAD — CITY OF SUNRISE, FL Engineer — Designed a precast privacy wall, regarding of drainage swale and roadway improvements. The project also involved median closures and coordination with landscape design improvements. ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 35 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G 1 N E E R I N G S E R V 1 C E S HERNANDOSEGURA HIGHWAY DESIGN EDUCATION: Mechanical and Architecture Drafting, LACC, Los Angeles, CA 1985; Industrial Design University Jorje Tadeo Lozano, Bogota Colombia 1980 PROFESSIONAL REGISTRATIONS: Not Applicable TRAINING /CERTIFICATIONS: 2004 Site Menu FDOT Training; 1984 Technical Interactive Graphics Design Intergraph YEARS OF EXPERIENCE: 21 Years YEARS WITH RJ BEHAR: 2009— Present ENGINEERING EXPERIENCE Mr. Segura has over twenty -one years of experience in civil engineering, survey and mapping projects throughout California and Florida. He is also experienced in municipal land development (commercial and residential) and roadway projects using CALTRANS and FDOT standards. At RJ Behar, Mr. Segura produces complete design of construction plans on all types of civil engineering projects. RELEVANT EXPERIENCE SR- 5 /US -1 /OVERSEAS HIGHWAY FROM FONTAINE DRIVE TO S. OF TAVERNIER CREEK BRIDGE, MONROE COUNTY, FL — FDOT, DISTRICT 6 CAD Designer - The scope of services includes milling and resurfacing (Roadway plans) and (Typical Sections), and signing and pavement markings plans. ADA and pedestrian features upgrades. Additionally the Typical Section was modified to accommodate bicycle lanes without widening. The plans were done and in compliance with FDOT cad standards. DESIGN /BUILD FOR THE RECONSTRUCTION OF SE 3rd STREET, BELLE GLADE, FL — FDOT DISTRICT 4 CAD Operator — This is a road reconstruction project (0.03 mile) in West Palm Beach County. He is involved in the preparation of plans, including roadway, drainage, lighting and pavement markings. He also prepared the plans and profiles for a new 8" water main and 8" PVC sewer line. These plans were used for quantity take outs for final construction cost. DESIGN /BUILD P3 FOR 1 -595 FINAL DESIGN, BROWARD COUNTY, FL — FDOT DISTRICT 4 (AECOM /DRAGADOS) CAD Operator — He is updating sediment structure details for Arrowhead and Pine Island Outfalls; including updating plans, cross - sections and drainage Maps for Zone 4 and Zone 6. INDIAN CREEK, MILLING AND RESURFACING — MIAMI, FL CAD Designer — He prepared full sets of construction drawings including roadway plans, pavement marking, drainage, cross sections and summary of quantities. CONGRESS AVENUE AND PARK AVENUE INTERSECTION IMPROVEMENT — PALM BEACH COUNTY, FL CAD Operator — He is responsible for preparing roadway plans for this intersection improvement in Palm Beach County, NW 7th /9th AVENUE CONNECTOR (DESIGN) — CITY OF FORT LAUDERDALE, FL CAD Designer — The scope includes design of a 1.5 mile urban section, 4 -lane divided, connector between NW 7th and NW 911 Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing and pavement marking and permitting. The project also includes public involvement coordination. SISTRUNK BOULEVARD (NW 27th AVENUE TO FEDERAL HIGHWAY) ROADWAY DESIGN — FORT LAUDERDALE, FL CAD Designer — He prepared full sets of construction drawings including roadway plans, pavement marking, drainage, and cross sections, summary of quantities and field inspection as well as data collection. SR -84 COLLIER COUNTY, FL — FDOT, DISTRICT 1 CAD Operator for the milling and resurfacing of 4 miles of an urban roadway section. The scope of services included development of typical sections, pavement design, 3R report, community awareness, roadway plans, computation books, LRE and Tran *port. SR -5 (US -1) HALLANDALE BEACH BOULEVARD TO YOUNG CIRCLE HOLLYWOOD, FL CAD Operator /Designer — 3R report, design field data collection and prepared sets of plans. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 36 C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S MARLIN SCATTOLINI HIGHWAY DESIGN EDUCATION: B.S. Civil Engineering Florida International University, Miami, Florida, 2006 PROFESSIONAL REGISTRATIONS: Not Applicable TRAINING /CERTIFICATIONS: FDOT Specifications Package Preparation Training for Consultants YEARS OF EXPERIENCE: 5 Years YEARS WITH RJ BEHAR: 2006 —Present ENGINEERING EXPERIENCE At RJ Behar, Ms. Scattolini is in charge of design and plans preparation of roadway projects, drainage plans, signing and pavement marking plans, signalization plans, as well as permitting package. She has more than five years of experience. RELEVANT EXPERIENCE MIAMI RIVER GREENWAYS, SEGMENT D — CITY OF MIAMI, FL Designer — The project consists of the reconstruction of an existing roadway segment along the Miami River to produce a scenic, landscaped, pedestrian /bicycle walkway /greenway. The project includes the design of a drainage system with wells, decorative lighting and landscape /hardscape design. SW 328th STREET FROM SW 152nd AVENUE TO SW 137th AVENUE — MIAMI -DADE COUNTY PUBLIC WORKS Designer responsible for the preparation of roadway, signing & pavement marking plans and drainage plans. The scope of the project included master planning and feasibility analysis for the new roadway. This project involved the upgrading of the existing traffic signals to mast -arms and internally illuminated signs. The design phase for this project comprised of drainage, lighting, signalization, signing and pavement markings. SR -836 EMERGENCY ACCESS RAMP, MIAMI -DADE COUNTY, FL — MDX Project Designer responsible for the roadway plans, traffic control plans, drainage analysis, utility coordination, lighting plans, signing and marking plans, structures (retaining walls) and special access gates. W. 2911 STREET 3R SAFETY REVIEW (FROM OKEECHOBEE ROAD TO W. 4th AVENUE) — CITY OF HIALEAH, FL Project Designer for the design and production of roadway, drainage, signing and pavement marking plans. The scope of services consisted of a 3R Safety Review, which included crash data analysis and field observations to provide a report with recommendations to minimize the frequency of accidents. PALM AVENUE (FROM WEST 45th STREET TO WEST 49th STREET) CITY OF HIALEAH, FL Project Designer for the design and production of roadway, drainage as well as signing and pavement marking plans. The scope of this project consisted of roadway improvements, milling and resurfacing, drainage, signing and pavement markings and lighting plans on Palm Avenue from West 45th Street to West 47th Street and from West 47th Street to West 49th Street in the City of Hialeah. POWERLINE ROAD (SR -845) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 Project Designer — Responsible for the preparation of roadway, signing and pavement marking plans, 3R reports, plans preparation, utility coordination, pavement design and quantities. Project length: 3 miles. E. 1St AVENUE, E. 47th STREET, E. 48th STREET - RECONSTRUCTION — CITY OF HIALEAH, FL Project Designer for the design and production of roadway, drainage as well as signing and pavement marking plans. SR -5 (US -1 /SOUTH FEDERAL HIGHWAY) BROWARD /PALM BEACH COUNTIES, FL— FDOT, DISTRICT 4 Project Designer— She prepared the signing plans. SR -806 (ATLANTIC AVENUE) PALM BEACH COUNTY, FLORIDA— FDOT, DISTRICT 4 Project Designer — Responsible for the preparation of the signing plans. The scope included milling and resurfacing (RRR) of 2.8 miles of a major arterial roadway, including drainage improvements, pavement marking and signing, lighting plans, eight signal locations, a public involvement program and landscape improvements. NW 71h /9th AVENUE CONNECTOR (DESIGN) — CITY OF FORT LAUDERDALE, FL Project Designer — The project includes the roadway design of a 1.5 mile urban section, 4 -lane divided, connector between NW 7th and NW 9th Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing pavement marking and permitting as well as public involvement coordination. EJR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 37 T w Q W im rx r��/ w vI W z W a W z z Z v z W w 0� w E✓ a H U 1210ddnS d`d (`U a331 1N3W30 M IN 1O3f021d I0NINOQ ,kinvnt) (130) NOI1O3dSN1 ONV ONIN33NION3 N011Of1211SNOQ NOUNION000 Ainun JNIIVWI1S31SOQ M3IA3N Mdld ONIIH011 133211$ SJNIAIVIN 1N3W3AVd 2 JNINJI$ NOIIVZIIVNJI$ ONINNVId NOliViN0dSNVNJ ONIN33NION3 0133`d21j JNliiIW213d IVIN3WN0211AN3 N3M3S 2 831VM Isol N31VMWNOIS NOIS3Q 30VNIVNa ONIN33NION3 311$ / IIAIQ NJIS3Q 133211$ ONb' ,kVMHOIH /,kVMOVON 30N3RI3dX3 30 S21t13A M N N N — N M N tD ° w SNOIIVOIAIIN3019 S3SN3011 w d w d U m = w w w w w d w w w U Vj L w d z Q 2 w Z w Z �' LL LL W o N LU 0 z o LU Z 0 o N o Q Y 0 m° w Q x _ ° oQ z m o o W o 0 0 LU a Q Q � ° ° < 00 M 0 0 z a w z z a 0 U x x w oa WR 1� U w QV LLI m x w W W I�.D z x w w z z z - z w U 0- Ll w h U INOddnS dV @@ a331 IN3W39VNVIN 103rONd I0NINOQ Aillvnt) (130) NOIi33dSNI aNV ONIN33NION3 N0iion 11SNOQ N0IlMa2100Q .kinin JNIIVWI1S3 BOO M31A3N Ndld ONIIH011 1332115 SONUINVIN IN3W3A`dd 19 ONINJI$ N0IIVZIIVNJIS ONINNvld NOIlb'1210dSNVZII JNIN33NI`)N3 0133b'2Ij JNIIIIWN3d , > IVAMN0NIAN3 213M3S'$ N31`dM N31VMWNOIS N0IS3Q 30VNIVN(I JNI2133NION3 311$ / IIAIQ NJIS3Q 133211$ aNb' ,kVMH01H /,kVMa`d0N 30N3RI3dx3 30 S21b A ° LO M M -;r -zr N o o c LO LU SN0IIVDIJIIH3019 S3SN3011 C15 LU w Q w w LU C6 w U Q z Q z Q z Q z Q C0 � Q a z J a `n Q ) Q z 0 J Q 0� w =) w F- 0 0 U cn wO z o 0 z G: a a z ¢ ¢ J a Z Q Q M 0 0 z 0 w z z 0. 0 V rx ¢ x w w cw I;h C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G 1 N E E R I N G S E R V I C E S 4. APPROACH/ MET HOLOGY METHOLOGY AND APPROACHES USED IN ACHIEVING TASKS During the early stages of project development, RJ Behar will seek to obtain input from the City's Staff and end users. Regardless of the goals, input during early development will ensure that a quality product is delivered to the City. RJ Behar will also seek to define the cost of all the goals identified and provide the City a preliminary cost estimate to validate programmed funding within the City's budget process. RJ Behar understands the need to provide accurate cost estimates for the development of capital improvement budgeting, Our management approach is to meet with the City's Project Managers and thoroughly integrate our procedures with that of the City and their process. RJ Behar's project approach is as follows: 1. The Principal -in- Charge is responsible for the overall successful completion, in terms of quality, timeliness, and budget. MR. ROBERT J. BEHAR, P.E. will serve as Principal -in- Charge. He is the firms' president and quality control officer 2. The Project Manager is responsible for the overall successful completion, in terms of quality, timeliness, and budget. MR. JAVIER RODRIGUEZ, P.E. will serve as project manager. The project manager is responsible for the preparation of the scope of services, procedure, staffing, work plan, schedules, estimated fee, and will have direct responsibility of the task completion. 3, As the task/assignment is identified and the City requires our services, the team will be assembled for the specific task. The team will include those disciplines required to the successful completion of the task. After approval from the City of the scope and work plan, we will proceed with the project development and preparation of deliverables. WORK PLAN IMPLEMENTATION The work plans for the various projects and task orders under consideration may vary greatly. RJ Behar believes that a project will be successful if it is well- organized to begin with; people are properly informed as to their responsibilities, schedules and budgets. Therefore, RJ Behar places a large emphasis upon the initial steps of the project on its first tasks: TASK 1 — KIcK -OFF AND PROJECT COORDINATION — This task includes a meeting (Kick -off) meeting with all relevant team members to discuss the scope, work plan, schedules. It serves to insure that all team members are in consonance and working towards the same goal. Project coordination will continue with meetings at the major milestones for the project. TASK 2 — INFORMATION GATHERING AND MAPPING — This is an extremely important phase of any project. Information for the planning area and infrastructure data will be gathered and mapped. All information and data will be provided to the City in electronic format. TASK 3 — DATA COLLECTION — This is an extremely important phase of any project. Information for the planning area and infrastructure data will be gathered and mapped. Of course, the following will be modified appropriately for the specific task order. All information and gathered data will be provided to the City in electronic format. ® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 1 C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G I N E E R I N G S E R V I C E S Data to be collected includes: a. Existing plans. b. Field surveys. c. Traffic data (Volumes, Turning Movements). d. Existing utility information. e. Intersecting roadways. f. Transit network. g. Drainage data. h. Contamination site updated reports. i. Groundwater table elevations. j. Existing Utility Atlas. i k. Summary report of citizen advisory committee reports. I � TASK 4— FIELD REVIEWS — RJ Behar will schedule a field review with the City's Staff, if necessary. These may include the City's Project Managers and maintenance personnel. Discussions will be aimed at reviewing the background of the project and any important issues, problems, or requirements. Other agencies, as deemed appropriate, may be invited. The RJ Behar team will assess the scope of the proposed improvements. In order to facilitate our team in the scope assessment, we will have a "Project Checklist" available at our field review. We will prepare minutes of the field review in order to define our scope of work. In the event that the City's representative is unavailable for the site meeting, RJ Behar will furnish photographs and videos of the project to point out areas of concern, This task may also include a review of the permit agency requirements and preliminary meeting to insure that the alternatives developed in subsequent phases are permissible. Some of this information can either be mapped in AutoCad or GIS methods, both of which we have expertise in. TASK 5 — TRAFFIC DATA COLLECTION — RJ Behar has in -house capabilities for collecting all the necessary traffic data, We have our own traffic counters that can produce; volume, speed, and vehicle classification studies. We also own intersection turning movement collection devices and staff trained in its use. All the necessary traffic data will be collected by RJ Behar's Staff, which will make it a more efficient and economical project component. OVERALL ORGANIZATION TO COMPLETING THE PROJECT • BETWEEN RJ BEHAR AND THE CITY OF SUNNY ISLES BEACH — As previously discussed, we will keep the City's Project Manager well- informed of all project issues at all times. Recognizing that City's Project Managers may be managing numerous projects at any given time, therefore, we will try to accommodate his or her day - to -day involvement by either 1) obtaining needed information ourselves, 2) maximizing electronic information transfer (e- mail), 3) conference calls, or 4) prompt meeting minutes. We will schedule progress meetings as often as the City's Project Manager desires. A progress report will be provided on a monthly basis including required action items and who is to follow up. The City's Project Manager is the voice for the City and therefore we will coordinate with him prior to meeting with other entities. • BETWEEN RJ BEHAR AND SUBCONSULTANTS — Another important aspect of coordination is between RJ Behar and its subconsultants, Again we will make use of electronic transfer of information in order to maintain close communication ties throughout the project. It will be our sole responsibility to make sure that our sub- consultants comply with their schedule and quality of their deliverable. A key to receiving quality work from subconsultants is to keep them informed. As the Prime Consultant, we will scheduled work tasks to get the required data to our subconsultants as soon as possible. We will provide our team project schedules and all updates to that schedule. R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 2 C I T Y OF S U N N Y I S L E S B E A C T R A F F 1 C E N G I N E E R I N G S E R V 1 C E S • BETWEEN RJ BEHAR AND UTILITY COMPANIES /PERMITTING AGENCIES — RJ Behar will develop a distribution list for each utility company and permitting agencies. Meeting with the permitting agencies will be held as soon as the concept is developed. Utility contacts will be made as soon as topographic features and right of way lines are plotted. Ongoing coordination will be maintained with all of the agencies. It is important to note that we propose to have a kick -off meeting at the beginning of the task with the City's Project Manager, our key staff and subconsultants. This meeting will insure that the project gets started on the "right foot ". The scope, work plan, schedules, and understanding of the task should be discussed and any major issues identified up- front. • BETWEEN RJ BEHAR AND PRIVATE STAKEHOLDERS — RJ Behar will, through the City, coordinate with the private stakeholders involved. We will organize public meetings, one -on -one meetings, conference calls and preparing presentations. We will make ourselves available to provide the services that the City needs. On all public meetings we will keep minutes, or recordings as needed to document these meetings. QUALITY CONTROL AND QUALITY ASSURANCE QUALITY CONTROL — Project efforts can be ineffective and time consuming if accomplished incorrectly. Our proactive philosophy emphasizes the early resolution of project issues: An on -going quality control process goes a long way identifying these key issues early. RJ Behar will ensure the quality of its product. We strongly believe that we are solely accountable for the delivered product, including the quality of our sub consultants' product. A synopsis of our quality Quality Control Process program is outlined below: ,---- ___- ____ -__ Produchun - - - - - - - - - - - - - - - QC REVIEWS — Will be separated into three major areas; 1) engineering design review (criteria) 2) plans preparation /cross reference review 3) constructability review. Providing for these will assure the City the quality it is paying for. For the review process we have developed check lists of items that must be 1 ' included on each type of project. k'' . k' (heck Set (heck Ses BICI AtUf W..1. QC PROCESS — Will follow a process, which starts with the 1) design originator, 2) it is sent to a checker, it MokeAddilionol ' Revlslons MnkeU duo , Uei .,.lbil: goes back to the 3) originator who reviews these and O Update _ t OR � Omisnons determines which comments are to be implemented. 4) The originator and checker meet to discuss the + M onAloogWlihREDMarkedPPnie Recheck RID Marked Prinls � comments and come to an agreement on the ` ° "� "° "`Mod` implementation of the comments. 5) If they cannot o �� 11 11 ki I come to an agreement the project manager will then make that determination. 6) Comments are r Ree,`ki! Checkng implemented. 7) Plans are back checked. All these steps will require an initialed and dated by the individual(s) involved: CONSTRUCTABILITY REVIEW — Mr. Juan H. Vazquez, PE, PH, BCEE will lead our constructability reviews. He has been involved in civil and environmental design engineering and inspection projects for over 26 years. He will be reviewing the plans from the contractor's perspective. He will be looking for lack of consistency between plans, specs, utility agreements, and permit agreements. He will ensure that all pay items are accounted for, check for feasibility of the construction sequence and last but not least for claims potential. ElR.j.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 3 C I T Y OF S U N N Y I S L E S B E A C T R A F F I C E N G I N E E R I N G S E R V I C E S QUALITY ASSURANCE — Mr. Robert J. Behar, PE, RJ Behar's principal in charge, president and CEO, will certify that the quality control reviews were completed prior to all formal submittals. ABILITY TO MEET DESIRED TIMELINES AND DEADLINES The table "Current Workload ", found on this page, illustrates RJ Behar's current workload and remaining fee under contract. In review of our anticipated spending of work under contract and with our current workforce, we estimate that we will begin to require new contracted work sometime this fall, The illustration shows a steady decline in our contract demands, which has been substantiated by our review of our future work under contract. The predicted fall -off in our backlog is fairly normal for this time of year. However, RJ Behar's staff will become more available as we approach fall, which seems to be well -timed for the anticipated needs for this contract. Our team has considerable resources and we do believe that we will be able to meet the challenges of the City's anticipated assignment. J- N 2 ` 0 0 0 `T.. 2 a+ Q � U 0 1 2 3 4 5 6 Dec. 2011 AVAILABILITYGRAPH AVAILABLE CONCLUSION 7 s 9 10 11 12 13 14 15 16 17 13 19 20 2012 Months RJ Behar has effectively demonstrated our understanding of the City of Sunny Isles Beach's request. We have provided a project approach, based on RJ Behar's management procedures and quality assurance practices, which closely match those required by the City, Based on our approach and current workload, we believe we have demonstrated our ability to successfully deliver a high quality service throughout this exciting project. ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 14 Y of City of Lauderdale Lakes • - Department of Public Works and Engineering Services r a 4300 NW 36th Street • Lauderdale Lakes, Florida 33319 -5599 4E LAKE`' Tel (954) 535 -2815 • Fax (954) 535 -0799 www. lauderdalelakes. org CLIENT REFERENCE FORM City of Sunny Isles Beach — Request for Qualifications RFQ No: 11 -11 -01 Traffic Engineering Services CLIENT: Name of firm to be contacted: City of Lauderdale Lakes Address: 4300 NW 36th Street Lauderdale Lakes, Florida 33319 Contact Name: Ms. Sonia Torres, PE, LEED AP City Engineer I Public Works and Engineering Services Tel: (954) 535 - 2712 /Fax: (954) 731 -5309 E -mail Address: storres @lauderdalelakes.org Project Performance Period Location of Project: Value of Design Services: 2004 to 2007 City of Lauderdale Lakes, Florida $ 282,767.00 BRIEF DESCRIPTION OF THE SERVICES PERFORMED FOR THIS PROJECT: The scope of project consisted of the design of NW 44th Street roadway improvements from East of State Road 7 to the city limits within the City of Lauderdale Lakes. The services included roadway plans, design of 72' culvert, signing and marking plans, concrete block privacy walls and traffic projections and warrant analysis. Referenced Company: R. J. Behar & Company, Inc. 7850 N.W. 146th Street, Suite 504 Miami Lakes, Florida 33016 Name of Project: NW 44th Street, City of Lauderdale Lakes, Florida Project Started: 2004 - Project Completed: 2007 Ms. Sonia Torres, PE, LEED AP - City Engineer I Public Works and Engineering Services Tel: (954) 535 -2712 Florida Department of Transportation RICK SCOTT 1000 NW 1 1 1 Avenue ANANTH PRASAD, P.E. GOVERNOR Miami, Florida 33172 -5800 SECRETARY CLIENT REFERENCE FORM City of Sunny Isles Beach — Request for Qualifications RFQ No: 11 -11 -01 Traffic Engineering Services CLIENT: Name of firm to be contacted Address: Contact Name: Project Performance Period: Location of Project: Value of Design Services Florida Department of Transportation, District 6 1000 N.W. 111 Street, Miami, FL 33172 Mr. Danny Iglesias, PE — Senior Project Manager Tel: (305) 470- 5289/Fax: (305) 470 -6725 E -mail Address: danny.iglesias @dot.state.fl.us 03/2010 to 08/2011 Monroe County, Florida $ 287,382.00 BRIEF DESCRIPTION OF THE SERVICES PERFORMED FOR THIS PROJECT: This project consists of 0.80 miles of 4 -lane divided, urban section of SR -5 located in the Florida Keys. The scope of services includes milling and resurfacing, signing and pavement markings, traffic control plans and ADA and pedestrian features upgrades. Referenced Company: R. J. Behar & Company, Inc. 7850 N.W. 146th Street, Suite 504 Miami Lakes, Florida 33016 Name of Project: SR- 5 /US -1 Overseas Highway (from Fontaine Drive to S. of Tavernier Creek Bridge) Monroe County, Florida Project Started: 03/2010 - Project Completed: 08/2011 Mr. Danny Iglesias, PE — enior Project Manager Tel: (305) 470 -5289 www.dot.state.fl.us Carlos Hernandez Mayor ' Garcia - Martinez yCouncil President Luis Gonzalez Council Vice President l� .of.N�q�F y• .b c� 5. i City of Hialeah CLIENT REFERENCE FORM Council Members Jose F. Caragol Vivian Casals -Munoz Katharine E. Cue - Fuente Paul B. Hernandez Jose Yedra City of Sunny Isles Beach — Request for Qualifications RFQ No: 11 -11 -01 Traffic Engineering Services CLIENT: Name of firm to be contacted Address: Contact Name: Project Performance Period: Location of Project: Value of Design Services City of Hialeah 5601 E. 811 Avenue Hialeah, Florida 33011 Mr. Jorge Hernandez - Director, Streets Division Tel: (305) 687• - 2.611 /Fax: (305) 687 -2.632 E -mail Address: jehernandez@ci.hialeah.fl.us 04/2008 to 06/2009 City of Hialeah, Florida $ 59,526.00 BRIEF DESCRIPTION OF THE SERVICES PERFORMED FOR THIS PROJECT: Roadway design engineering services, signalization, signing and marking as well as lighting plans. Referenced Company: R. J. Behar & Company, Inc. 7850 N.W. 146th Street, Suite 504 Miami Lakes, Florida 33016 r i 5} n , r•' �1 7rr. (�; ,,Fyr� �Rli? C ri�c.t AA!` i� f Y� I(Y♦'i!)r� .V, t r ,, i, .. i.. , r_ Q „S. .. City of Hialeah, Florida Project Started: 04/2008 - Project Completed: 06/2009 Z Mr. Jorg4Hrnandez - Director, Streets Division Tel: (305) 687 -2611 Raul L. Martinez Government Center 501 Palm Avenue, Hialeah, Florida • 33010 -0719 N,iv�v.hialeahfl.gov C I T Y OF S U N N Y I S L E S B E A C H T R A F F I C E N G I N E E R I N G S E R V I C E S 6. OFFICE LOCATIONS R. J. BEHAR & COMPANY, INC. is a civil engineering firm with three offices located in Florida. Currently, we have one office in Broward County, an office in Miami -Dade County and one in Palm Beach County. The project will be managed and produced from our Miami -Dade County office, which is located at: 7850 NW 146TH Street, Suite 504 Miami Lakes, FL 33016 Contact Name: Mr. Javier Rodriguez, PE Project Manager /Director, Civil Engineering Tel: (305) 558- 3777/Fax: (305) 558 -8909 E -mail Address: j.rodriquez ,rjbehar.com OTHER OFFICE LOCATIONS ARE: BROWARD COUNTY OFFICE 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 Contact Name: Mr. Robert J. Behar, PE Tel: (954) 680- 7771/Fax: (954) 680 -7781 E -mail Address: bbehar(cDribehar.com PALM BEACH COUNTY OFFICE 12788 Forest Hill Boulevard, Suite 2003B Wellington, Florida 33414 Contact Name: Mr. Sean F. O'Keefe, PE Tel : ( 561)333-7000/Fax:( 561) 333 -7001 E -mail Address: sokeefe(@r'behar.com PALM BEACH COUNTY OFFICE IAM1 -DADS COUNTY OFFICE ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 1 "'y Of SUM r1. DELIVER TO., REQUEST FOR City of Sunny Isles Beach QUALIFICATIONS OPENING: 10:00 A.M. City Clerk SECTION 6 12 -02 -11 18070 Collins Avenue BID SUBMITTAL FORMS Sunny Isles Beach, FL 33160 PLEASE QUOTE PRICES F.O.B. DESTINATION, LESS TAXES, DELIVERED IN CITY OF SUNNY ISLES BEACH, FLORIDA NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Bid price should be less all taxes. Tax Exemption Certificate furnished upon request. Issued by: Purchasing Agent Date Issued: This Bid Submittal Consists of 11 -08 -11 Pages 20 through 23 Sealed bids are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. RFQ 11 -11 -01 TRAFFIC ENGINEERING SERVICES A Bid Deposit in the amount of 0% of the total amount of the bid shall accompany all bids A Performance Bond in the amount of 0% of the total amount of the bid will be required upon execution of the contract by the successful bidder and City of Sunny Isles Beach Procurement Agent; Marcanthony Tulloch Commodity Code(s): Firm Name. R. J. BEHAR & COMPANY, INC. RETURN ONE ORIGINAL AND FOUR COPIES OF BID SUBMITTAL PAGES AND AFFIDA VITS FAILURE TO SIGN PAGE 23 OF SECTION 6 BID SUBMITTAL WILL RENDER YOUR BID NON- RESPONSIVE City of Sunny Isles Beach I Request for Qualifications No. 11 -11 -01 "'y of so" PN' SECTION 6 BID SUBMITTAL FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID PART II: Addendum #1, Dated Monday, November 14, 2011 Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated ❑ NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID FIRM NAME: R. J. BEHAR & COMPANY, INC. AUTHORIZED SIGNATURE: - DATE: December 2, 2011 TITLE OF OFFICER: Robert J. Behar, PE City of Sunny Isles Beach I Request for Qualifications No. 11 -11 -01 "Fy or soµ ra, BID SUBMITTAL FORM Bid Title: TRAFFIC ENGINEERING SERVICES The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of Sunny Isles Beach in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. The Proposers accepts all of the terms and conditions of the Advertisement or Request for Qualifications and Instructions to Proposers, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within ten days after the date of the City's Notice of Award. In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that: The Proposer has familiarized himself /herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposers to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and /or Notice to Proceed. City of Sunny Isles Beach I Request for Qualifications No. 11 -11 -01 "fir OF sotA w- Firm Name: R. J. BEHAR & COMPANY, INC. Street Address: 7850 NW 146th Street, Suite 504, Miami Lakes, FL 33016 Mailing Address (if different): Same as above Telephone No. (305) 558 -3777 Fax No. (305) 558 -8909 Email Address: bbehar @rjbehar.com FEIN No. � 5 0 * "By signing this document the bidder agrees to all Terms Signature: (Signature of authorized agent) Print Name: Robert J, Behar, PE Title: President/CEO THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON - RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. City of Sunny Isles Beach I Request for Qualifications No. 11 -11 -01 O� U /NN Y IS4\\\ v �FLO� C/ T), OF SUN P C) T City of Sunny Isles Beach I Request for Qualifications No. 11 -11 -01 ry -s;�o �o yyr �r /rr of sutl o 6�yVNNY IS, NON - COLLUSION AFFIDAVIT City of Sunny Isles Beach 18070 Collins Avenue SF, ,997 • F`l_O PLO y'`p Sunny Isles Beach, FL 33160 'Y or suN "'o Telephone: (305) 947 -0606 Fax: (305) 949 -3113 STATE OF FLORIDA ) COUNTY OF Broward The undersigned being first duly sworn as provided by law, deposes, and says: This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of, R. J. BEHAR & COMPANY, INC. (Name of Corporation, Partnership, Individual, etc.) a, Corporation formed under the laws of Florida (Type of Business) (State) of which he is Owner /President (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid, or that such person, firm or corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 10.2, has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to any 7=:L Robert J. Behar, PE President/CEO AFFIANT'S NAME AFFIANT'S TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this 2nd day of December L SU Personally Known or Produced Identification Type of identification (Affix seal here) — SPQY Pew„ LIZANNA KADIR A O MY COMMISSION #DD862979 � EXPIRES: MAY 13, 2013 ft`,, Bonded through 1st State Insurance 20011 Lizanna Kadir c kllc2j� NOTARY PUBLIC (name printed or typed) DECEMBER 28, 2010 1 of 7 �3t4NY Is, PUBLIC ENTITY CRIMES � x City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 c "r or SUN " o Telephone: (305) 947 -0606 Fax: (305) 949 -3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub - Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list ". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to City of Sunny Isles Beach by Robert J. Behar, PE - President/CEO Lprint individual's name and title] for R. J. BEHAR & COMPANY, INC. [print name ot entity sul)mitting sworn statement] whose business address is: 7850 NW 146th Street, Suite 504, Miami Lakes, FL 33016 and (if applicable) its Federal Employer Identification number (FEIN) is (If the entity had no FEIN, include the Social Security Number of statement: ) 65- 0954070 the individual signing this sworn 11.2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. 1 understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non -jury trial, or entry of a plea of guilty or nolo contendere. 11.4. 1 understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair DECEMBER 28, 2010 2 of 7 market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 11.5. 1 understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) X Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. By. � d/— (Signature) Robert J, Behar, PE (Printed Name) PresidenVCEO (Title) Sworn to and subscribed before me this 2nd day of December , 20 11 , by (AFFIX NOTARY STAMP HERE) LIZANNA KADIR Signature: Notary Public — State of Florida Lizanna Kadir A'A- MY COMMISSION #DD862979 2; €tg EXPIRES: MAY 13, 2013 Print or Type Commissioned Name Bonded through 1st State In ance Personally Known _p R Produced Identification Type of Identification Produced 10/1998 3 of 7 O�SJNNYIS`�se � F P C'TY Of SuN PNO EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949 -3113 EQUAL OPPORTUNITY /AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: Robert J. Behar, PE ' )— `( �----• Title: President/CEO Firm: R. J. BEHAR & COMPANY, INC. Address: 7850 NW 146th Street, Suite 504, Miami Lakes, FL 33016 DECEMBER 28, 2010 4 of 7 9x CONFLICT OF INTEREST City of Sunny Isles Beach r • 18070 Collins Avenue 4F C99' P l OQ'`OO yWP Sunny Isles Beach, FL 33160 ' ov suN "N Telephone: (305) 947 -0606 Fax: (305) 949 -3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTY OF Broward BEFORE ME, the undersigned authority, personally appeared Robert J. Behar, PE , who was duly sworn, deposes, and states: 18.1. 1 am the PresidenUOwner of R. J. BEHAR & COMPANY. INC. with a local office in Miami Lakes, FL and principal office in Pembroke Pines, FL 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No. described as: Landscape Maintenance Services. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 18.5 Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 18.7 1 certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 18.8 1 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.9 In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach. Dated th s 2nd a of December 2011 o ell J. Behar7F - PresiaenVCEO AFFIANT v Print or Type Name and Title Sw9w6 to and subscribed before me this 2nd day of December , 2010. Personally Known OR O Produced Identification ; Type of Identification Lizanna Kadir —JKk�, NOTARY PUBLIC STATE OF FLORIDA :PeY'P LIZAINI NA KADIR 47�'�', MY CDMF�IISSIDN #DD862979 o <= EXPIRES: MAY 13, 2013 B011(4 threuO 1st State Insurance DECEMBER 28, 2010 5 of 7 SJN N Y 'S <F�, _ DISPUTE DISCLOSURE V _ I City of Sunny Isles Beach 18070 Collins Avenue yF CD9�. F'GO V,\ y Sunny Isles Beach, FL 33160 'r or suN " Telephone: (305) 947 -0606 Fax: (305) 949 -3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No". If you answer °Yes ", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? X YES NO 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO X 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES NO X If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. R. J. BEHAR & COMPANY, INC. December 2, 2011 Firm �2- Authorized Signature Date Robert J. Behar, PE - PresidenVCEO Print or Type Name and Title DECEMBER 28, 2010 6 of 7 SUNNY �S�F ?. Y V _ I of C" Oi SUN PNQ STATE OF FLORIDA ) ) COUNTY OF Broward ) ANTI - KICKBACK City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949 -3113 ANTI - KICKBACK AFFIDAVIT I. the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. By: Robert J. Behar, PE 3---v a__ Title: President/CEO The foregoing instrument was acknowledged before me this 2nd day of December , 20 11 , by Robert J. Behar, PE [name of person], as President/CEO [type of authority], for R. J. BEHAR & COMPANY, INC. [name of party on behalf of whom instrument was executed]. AFFIX NOTARY STAMP HERE: LIZANNA KADIR 0P!/6 'b €e; ' Ln MY COMMISSION #DD862979 =: EXPIRES: MAY 13, 2013 O ` Bonded through 1st State Insurance Notary Public — State of Florida Lizanna Kadir Print or Type Commissioned Name Personally Known OR Produced Identification Type of Identification Produced DECEMBER 28, 2010 7 of 7