Loading...
HomeMy WebLinkAboutKimley-Horn #1r CITY OF SUNNY ISLES BEACH Traffic Engineering Services RFQ No. 11 -11 -01 ( it prepared for: tiF 199 * F L 0 c'T Y 0 F S U N 1•�0 prepared by: CZMMFI Kimley -Horn and Associates, Inc. OY300164.1 �c, n.ori �> h' 2rVF��SaN: �Yfk ±4!n?+CPi+�i�Rt:.+F.MacaiW� �i _Y� f r CITY OF SUNNY ISLES BEACH Traffic Engineering Services RFQ No. 11 -11 -01 ( it prepared for: tiF 199 * F L 0 c'T Y 0 F S U N 1•�0 prepared by: CZMMFI Kimley -Horn and Associates, Inc. OY300164.1 EM" Kimley -Horn 0 and Associates, Inc. _ 1920 Wekiva Way Suite 200 `' West Palm Beach, FL December 1, 2011 33411 Tel. (561) 845 -0665 City of Sunny Isles Beach .,Et0,p 7 Fax (561) 863 -8175 Sunny Isles Beach Government Center c ;� +'ct5ann�asleRF3oact 18070 Collins Avenue catnFry °rmm'ci>yci"rk ! Sunny Isles Beach, FL 33160 Re: Traffic Engineering Services, RFQ No. 11 -11 -01 Dear Selection Committee Members: The population of Florida is growing. Individual city streets, roadways, and intersections are feeling the effects of this growth with increased traffic and congestion. Destinations such as the City of Sunny Isles Beach must respond - to this expansion to accommodate the increasing demands of residents and visitors alike. The City has responded 1 and continues to serve those demands by hiring the best consultants available. Consequently, Kimley -Horn and Associates, Inc. wants to be your consultant of choice to work with the City on your traffic engineering challenges cited in your Scope of Work to improve the lives and daily activities of your residents. Just this past year, you selected us as one of your pre - qualified consultants, and that selection was based on several years of providing you outstanding and responsive traffic services. We believe that our team can serve you better than any other for the following reasons: Thorough Project Understanding. Kimley -Horn has been at your side for a wide variety of transportation engineering projects in recent years. Having written the project's original scope of services, Kimley -Horn is thoroughly familiar with this project's history, as well as issues regarding designing and permitting the driveway entrance on Collins Avenue (SR Al A) with revised parking and landscaped islands immediately adjacent to the driveway. We have already discussed the project requirements with local agency staff and know the permitting process, which will help to keep the project moving smoothly. Furthermore, we have worked closely with you over the past years —and continue to work with you regarding access to this property. We have aided you in We have the seeking a signal at the intersection of the shopping center, Trump International experience, knowledge, Beach Resort, and Collins Avenue. As recently as the past few months, we have and vision to partner assisted you in seeking an FDOT approval for the curb cut that is the basis of this with City staff in proposal. We feel we are best positioned to design and permit this driveway since providing quality we have a long history of working with you on this very location. improvements Committed Project Team. The team of transportation professionals we have and additions to assembled to complete assignments under this contract have worked with the the transportation City of Sunny Isles Beach before and are committed to continuing to provide infrastructure within exceptional client service. We have the experience, knowledge, and vision to the City. partner with City staff in providing quality improvements and additions to the transportation infrastructure within the City. Adam Kerr, P.E. and his team have worked with the City on various traffic engineering projects, including: TR3000164. 11- 0_ SunnylslesBCh _TrafficEngservs.indd Kimley -Horn and Associates, Inc. City of Sunny Isles Beach, December 1, 2011, Page 2 • Signal warrant analysis and FDOT permitting assistance for signal at 182nd Street and Collins Avenue • Support to the City regarding traffic circulation analysis at the new Heritage Park • Identification of vehicular and pedestrian issues for the proposed Sunny Isles Aquatic Center Comprehensive Transportation and Traffic Services. Traffic engineering and transportation planning are the cornerstone of our firm. Kimley -Horn is a national leader in transportation planning and traffic operations and was ranked 12th in transportation services by Engineering News- Record in 2010. Kimley -Horn offers complete traffic engineering services in- house; our professionals have completed thousands of traffic engineering projects. The traffic engineering group includes experts in the areas of traffic modeling, transportation impact studies, traffic signal and ITS design, geometric roadway design, DRI reviews, and data collection /CADD services. Direct Qualifications, Experience, and Availability. We have local staff who can adequately handle the majority of the City's contract needs and situations, as well as nearly 400 personnel throughout Florida. In addition, Kimley -Horn has a total staff of more than 1,500 individuals in 57 offices nationwide that we can call upon for expert assistance as needed. As the City will see, the resumes of the professionals that will serve on this contract confirm each staff member's breadth of experience and capability. Professional Partners. Kimley -Horn knows the importance of providing you with quality transportation services and have partnered with Caulfield & Wheeler, Inc. to supplement and enhance our project team with their survey expertise. Summary. Kimley -Horn has the experience, manpower, expertise, drive, and resources to work as a cohesive unit with the City of Sunny Isles Beach to ensure that this project is completed to your specifications. We focus on timely, efficient performance and understand that responsiveness is one of your priorities. Kimley -Horn is not focused on the short-term result, but is devoted to continuing our long -term relationship founded on trust, respect, and teamwork. We look forward to maintaining our service to the City and being part of your team in improving the lives and experiences of your residents and visitors. Very truly yours, WKerr, AND ASSOCIATES, INC. Project Manager /Associate a TR3000164. 11 -Q_SunnylslesBch— Tra(ficEngServs. indd BEACH migillecruig Services RFQ No. 11-11-01 Table of Contents TSF 99 >Y�O'r' SF,P C,TY OF SUN PNO Company Information .......................... ..............................1 Qualifications ........................................ ..............................2 Staffing.................................................. ............................... 3 Approach /Methodology ....................... ..............................4 References.............................................. ..............................5 Office Locations .................................... ..............................6 ContractForms ...................................... ..............................7 • Bid Submittal Forms • Non - Collusion Affidavit • Public Entity Crimes • Equal Opportunity /Affirmative Action • Conflict of Interest • Dispute Disclosure • Anti - Kickback Affidavit TR3000164. 11- 0_ SunnylslesBch _TrafficEngServs.indd Kimley -Horn G and Associates, Inc. Name of Agency /Company Kimley -Horn offers clients the individual, personal service that you would expect from a local firm, coupled with the manpower and technical resources of a nationally- , ranked engineering firm. Company Locations Kimley -Horn is divided into six geographic regions. Each region is managed by a team of representatives from production, marketing, administration, and practice building. Setting overall direction and policy is the firm -wide management committee —also composed of representatives from production, marketing, administration, and practice building —which assists the regional teams, as needed. Today, Kimley -Horn has more than more than 1,500 employees in 57 offices in 17 states offering a full range of consulting services to local, regional, national, and international clients. In Florida alone, there are nearly 400 employees in 17 offices. Kimley -Horn offers their clients the individual, personal service they would expect from a local firm combined with the TR3000164.1I- _ SunnylslesBch _TifficEngSelvs.indd Kimley -Horn and Associates, Inc. was founded in 1967 in Raleigh, North Carolina by Bob Kimley and John Horn —two senior engineering professors at North Carolina State University. The expertise of the firm was initially focused on traffic planning and public transportation projects. In the ensuing 44 years, the firm has expanded both geographically and in the variety of planning, engineering, and environmental services that it provides. Kimley -Horn offers clients the individual, personal service that you would expect from a local firm, coupled with the manpower and technical resources of a nationally- ranked engineering firm. Kimley -Horn has all the ingredients of a successful consultant firm a proven record of client service, adaptability, versatility, and responsiveness. Arizona Florida (continued) Maryland Tennessee East Valley Jacksonville Bethesda Memphis Phoenix Lakeland Nashville Tucson Miami Beach Minnesota Ocala Twin Cities Texas California Orlando Austin Los Angeles Pod Charlotte Nevada College Station Los Angeles Downtown Sarasota Las Vegas Collin County Oakland SL Lucie Reno Dallas Orange Tallahassee Fort Worth Pleasanton Tampa New York Houston Riverside Vero Beach New York Las Colinas Sacramento Volusia County San Antonio San Diego West Palm Beach Nonh Carolina San Jose Charlotte Virginia j Stockton Georgia Durham Hampton Roads 1 Atlanta Midtown Fayetteville Northern Virginia i Colorado Atlanta North Raleigh Richmond Denver Raleigh Downtown Virginia Beach Idaho Florida Boise Pennsylvania Wisconsin Arcadia Philadelphia Madison Boca - Delray Illinois Deslin Chicago South Carolina Fort Lauderdale Downers Grave Beaufort C—" Kimley -Horn Page 1 -1 and Associates. Inc. manpower and technical resources of a nationally - ranked engineering firm. Kimley -Horn provides an integrated spectrum of services designed to best meet your immediate needs, as well as your big picture priorities. We have extensive experience serving municipalities, counties, and governmental agencies. Additionally, many of our employees are former municipal engineers and planners. They have been on your side of the table and are familiar with local government procedures. Internet Web Site Address Kimley- Horn's internet address is: http: / /www.kimley- horn.com. Details of Entity Business Structure (Corporation, Partnership, LLC) Kimley -Horn and Associates, Inc. is a privately -held corporation, fully owned by individuals who are current employees of the firm. Our employee owners are the sole stockholders of the company and are the professionals who directly serve our clients. The operations of the firm are not influenced by non - employee owners whose interests may conflict with client service. Since Federal Identification Number (FEIN): 56- 0885615 Corporate charter number: 126896 Professional license number: 00000696 Data authorized to do business in Florida: April 24, 1968 Florida corporate charter number 821359 ownership is spread throughout key professionals, and no single individual or small group owns controlling interest of the firm, the company is positioned for long -term stability. The core elements of Kimley- Horn's corporate philosophy are expressed in its mission statement: Kimley -Horn and Associates, Inc. is a business -based consulting practice, operated with integrity and dedicated to providing timely, quality professional services in a profitable manner —thus meeting the needs of our clients and satisfying the professional and financial objectives of our employees and owners. Date Founded Kimley -Horn and Associates, Inc. was incorporated in the state of North Carolina on February 10, 1967. f x r—FJ Kimley -Horn TR3000164. 11. 0 _Sunny1s1esBc1_T fficEngServs.mdd Page 1 -2 and Associates, Inc. Traffic CITY OF SUNNY ISLES BEACH g En � eem Services Kimley- Horn's corporate headquarters is located at: 3001 Weston Parkway Cary, NC 27513 -2301 (919) 677 -2000 Kimley- Horn's local office for RFQ No. 11 -11 -01 is: 1920 Wekiva Way, Suite 200 West Palm Beach, FL 33411 (561) 845 -0665 List of Any Outstanding Litigation That Would Threaten the Viability of the Firm or the Performance of this Contract A list of Kimley- Horn's outstanding litigation is provided as part of the Dispute Disclosure Form located in Section 8. Proof of Insurance A copy of Kimley- Horn's standard certificate of insurance is included at the end of this section. Please note that Kimley -Horn will issue a project- specific Certificate of Insurance once we are under contract. Time Reauired to Implement Services After Work Authorization Please refer to the project schedule provided in Section 2. TR3000164.11 A_ Sunnylslesech_TfficEngServs.indd Page 1 -3 1111111P�11111111111" Kimley -Horn and Associates. Inc. I Traffic CITY OF SUNNY ISLES BEACH .t ¢ g neeM En � Services AC- CERTIFICATE OF LIABILITY INSURANCE DaTE 4MM0[HYYYYI 11/22/2010 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW - THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER AND THE CERTIFICATE HOLDER - IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement- A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsementjs). � L i nn aFSS: 7 noyo laLlamesgongh _Con 0001398 INSURERI31 AFFORDING COVEFAOE NAIO2 INSURED Kimley -Horn and Associates, Inc. P -0. Box 33068 Raleigh NC 27636 I Traffic CITY OF SUNNY ISLES BEACH .t ¢ g neeM En � Services AC- CERTIFICATE OF LIABILITY INSURANCE DaTE 4MM0[HYYYYI 11/22/2010 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW - THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER AND THE CERTIFICATE HOLDER - IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement- A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsementjs). PRODUCER Ames and Gough 450 Northridge Parkway Suite 102 Atlanta GA 30350 Jerry Noyola PHONE Not: FAX nn aFSS: 7 noyo laLlamesgongh _Con 0001398 INSURERI31 AFFORDING COVEFAOE NAIO2 INSURED Kimley -Horn and Associates, Inc. P -0. Box 33068 Raleigh NC 27636 MURERA :Travelers Indemnity Co. of CT 25682 INSuRERBIT rave lers Indemnity Company 5658 MURERc:Travelers Property Casualty Co. 5674 ImuRERD:Phoenix Insurance Company 5623 IMURERELeXinITtOn Insurance ComlpanV 19437 INSURER F: PEEMI3rS -Ea o[c—_ rnVFRar r:q rFRTIFIr ATr M1IMRr P-"1U -il (KJ -J.V Shama) Rr-VIglrIAINIIMRFR- THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED_ NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSION A.ND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAINIS, INSR LTR TYPE CF INSURANCE INSR •aryp POLICY NUMBER FIMLUDQryYYFFY MY ICY YY LIMITS GENERAL LIAB'rLM E4:H w.JJRRE1Y = S 1,000,000 PEEMI3rS -Ea o[c—_ S 1,000,000 X CathllERcAAL GErRAL u ABLJTY A ';:,vtit3.rry OCCUR - 630- 0193B99A- TCT -10 12/1/2010 12/1/2"11 MED EXP:Any pre perm;- ; 10,000 P=F,WNas.wVIUJURY 5 1,000,000 GENE4.AJ-hGGREDATE S 2,000,000 3EYL.4Alln —,LIMn APPUESPEFL PRODUC- TS- •t- .O1.IPG, ?AGG $ 1,000,000 S POLICY X FRO- X LCD`.. AVrOMOBRELAHILITY CC44ECED SINGLE UlAIr IEa rode -O S 1,000,000 B X ANY AUTO ALL CANED NurDa - 810 - 57248497- IiD -10 12/112010 12/1✓201Y EJDPY INA;RY ;P7 pa:ml s 6CDfiY INJURY ;W1 SiOdaIC- ; 3C'4ECUL =D AUTCG X HIRF7.+Ai.T05 P=t,--PS--R-,Y DA).W7E RFC xcden ?I S Unde^.- mm mwDra Bl spit S X NG*Q%% ED AkrCG Unrisr -d —*Xm pmmrty S X UMBRELLA LAS X OCCUR EkCH OOCURRID C:E S 5,000,000 AGGREGATE S 5,000,000 EXCESS LIAR CLAN1S-MACE CEaUOt193LE $ 1 S C X RETEW)ON S 10,000 M1- CUP- 8193B99A- TIL -10 12/1/2010 L2/1/2011 D YAD RN19tS COMPEN SATWN AND EMPLOYERS' LIABILITY Y J N RL� CRR .,%RTN7RF IECI.7P.E � WwWatoryh Mn MIA NTDB- 8193599A -10 12/1/2010 12 /1,''ZOYl TI+ X 3T.A71 O_ EL EACH AO' ---ENT S 500.000 EL D/E.PASE - EA ZPAPLOYM S 500,000 r • //es tlrcrtx veer _=aMirnCti OF ,1ERATTC45 becr E:. D1oEAEE - PCLIOY LIMB S 500,000 I3 Professional Liability 16017332 12/9/2010 12 /1/2011 p Yam $2,000,000 Apjegale $2,000,000 DESCRIPRONOFOPERATIBN81LOCATION3IVEH MOLE3 (Attach ACGRO tRH, Add IUDMI RAmufk% SobiduN, Irn>$a cPa Wregilked) rauro I wrlrvu ACORD 25 (20091U9) 1191yUU -LUIrJ At.UKU I- L)KFVHA I IVn- Air rlgnrs reserYecl- 1NS025 :vnwsi The ACORD name and logo are registered marks of ACORD t > 1 n t f w �Iw Kimley -Horn TR300016411. 0- Sunnylslesech _TrdffcEngServs.indd Page 1-4 1111t, so and Associates. Inc. SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DEUVERED IN Sample /For Proposal Only ACCORDANCE WITH THE POUCY PROVISIONS. AUTHORIZED REPRESENTATFVE Hatias DrmaBa /NDYOLA ACORD 25 (20091U9) 1191yUU -LUIrJ At.UKU I- L)KFVHA I IVn- Air rlgnrs reserYecl- 1NS025 :vnwsi The ACORD name and logo are registered marks of ACORD t > 1 n t f w �Iw Kimley -Horn TR300016411. 0- Sunnylslesech _TrdffcEngServs.indd Page 1-4 1111t, so and Associates. Inc. Kimley -Horn provides an integrated spectrum of services designed to best meet Kimley -Horn clients' immediate needs, but also clients' big picture priorities. The firm offers provides an extensive experience serving municipalities, counties, and governmental integrated spectrum agencies — including Sunny Isles Beach. Kimley -Horn has assisted you with your of services designed transportation engineering needs for several years. Additionally, many employees to best meet clients' are former municipal engineers and planners and have been on the client's side of the table and are familiar with the operations and protocols of local governments. immediate needs, As showcased throughout this section, the Kimley -Horn team offers the but also clients' big perfect combination of relevant experience, engineering experts, and picture priorities. proven cost control management techniques to meet or exceed the requirements of RFQ No. 11- 11 -01. General Civil Engineering Civil engineering forms the backbone of Kimley- Horn's qualifications to serve as a general consulting engineer. In Florida, more than 100 of Kimley- Horn's staff are Kimley -Horn professionally registered as civil engineers. At Kimley -Horn, our professionals are has the in -house experienced in utility engineering, site planning and master planning, site grading, capabilities to surface water management, parks and recreational facilities design, and hydraulic/ hydrologic modeling, among other areas of expertise. Kimley -Horn has the in -house satisfy any civil capabilities to satisfy any civil engineering need required; this depth of resources engineering need means that clients will benefit from experienced professionals who practice civil required. engineering for public sector clients every day. Traffic Engineering Services Kimley -Horn offers complete traffic and transportation engineering services in- house. The firm has completed thousands of traffic engineering projects, ranging from major area -wide networks involving hundreds of intersections to single intersection designs and analyses. Kimley- Horn's traffic engineering staff includes experts in the areas of intersection design; signing and marking studies and plans; vehicular speed studies; safety and operations studies and plans; accident analysis and forensics investigation; pedestrian safety programs; innovative parking, access, and circulation studies; traffic calming; signal system design; and traffic engineering general consultation. The firm is a national leader in the assessment of transportation impacts and the development of methodologies to continuously monitor development - generated traffic. Roadway Design Roadway design and planning is one of the mainstays of Kimley - Horn's professional practice. Collectively, the firm's engineers have been responsible for the design of more than 2,500 miles of roadway, much of it here in Florida. Kimley -Horn has provided these services for urban, rural, primary, secondary, and interstate roadways for clients ranging from municipalities to state departments of transportation TR3000164. 11. 0_ SunnylslesBch_T4fficEngServs.indd Page 2 -1 C—FI Kimley -Horn I• and Associates. Inc. Traffic CITY OF SUNNY ISLES BEACH Engineemg . Services Transaortation Plannin For more than four decades, Kimley -Horn has been improving the transportation network in Florida as a consultant to cities, counties, transportation planning organizations (TPOs), and metropolitan planning organizations (MPOs). We are renowned for excellence in transportation planning, land use planning, and traffic engineering services. Our wide spectrum of experience includes corridor planning, traffic impact analyses, intelligent transportation system design and planning, DRIs, congestion management, funding assistance, multimodal planning, feasibility studies, geographic information systems, systems management, environmental assessments, computer modeling, and public involvement. Kimley- Horn's wide spectrum of transportation planning experience includes the following: • Long -range transportation plans • Transit development planning • Bicycle /pedestrian planning • Multimodal planning • Transportation modeling • Corridor studies • Traffic impact analyses • Feasibility studies • Geographic information systems • Public involvement • Congestion management • Transportation demand management • Transportation control measures • Intelligent transportation systems • Air conformity analyses • Funding assistance When it comes to Florida's transportation regulations, policies, and procedures, Kimley- Horn's knowledge is unsurpassed. Consultants with passion and devotion can generate extraordinary ideas —ideas that can transform communities. To maintain our reputation for cutting -edge consulting, we retain the most talented people in the consulting industry. Because of our vast experience, we know that agency coordination is a significant aspect of all types of transportation planning tasks. Additionally, many of our key team members are former city and county employees who can see things from your perspective. Landscape Architecture i Kimley -Horn has become one of the premiere landscape architectural firms in Florida and has a well- earned reputation for combining creative ideas, technical excellence, and client collaboration, resulting in dynamic projects that blend into their environments and become a part of the area they inhabit. Kimley- Horn's landscape architects emphasize the development of a pleasing visual environment, meaningful themes, distinctive images, and strong sense of place, while remaining sensitive to budget and long -term maintenance obligations. TR3000164.11.0_SunnylslesBch_T McEngSeivs.indd ' Kimley -Horn has extensive experience in providing landscape architecture services for downtown Page 2 -2 G =" Kimley -Horn and Associates. Inc. Traffic CITY OF SUNNY ISLES BEACH j � Traffic CITY OF SUNNY ISLES BEACH g eem En � services Quality Assurance /Quality Control (QA /QC) Since its founding, Kimley -Horn has aggressively pursued its commitment to quality for every task, deliverable, and service provided by the firm. Recognizing the critical importance of careful quality control, Kimley -Horn developed a QA/QC manual that every project manager is required to know, and we certify that our procedures will ensure high - quality services that satisfy the County's needs. Quality is a keystone principle of Kimley -Horn. It is one of the key attributes that has enabled us to become one of the leading consulting firms in the country and it is absolutely essential to our continuing success. Kimley- Horn's QA/QC program is based on the philosophy that: • Quality is achieved by adequate planning, coordination, training, supervision, and technical direction, MCnFY - - - - - MI,D FY - - - - - - proper definition of the job requirements - and procedures; understanding T Ik QC the scope of services; and the use TppDoceumel%t neadyt•rac nevi moaddb a r -t. d by of appropriately skilled personnel T ° °bnloalT °.m LTn performing work functions carefully. q------------- - - - - -� • Quality is assured through the careful T.,kQC 1ACL oe Hevlewee Conttrmatl•n Aaelgned checking, reviewing, and surveying of � "—t Mgr. work activities by individuals who are not directly responsible for performing ' Task Leader th f ............................. i 10 Team Aeelgned I. task —plot. i Gwlity the initial efforts. ! z_ n�feV1H° A,eunm. ll aA,�oc by 7. Fetail8 comment[ i Mgr. ■ Quality is controlled by assigning t. Make can cM. ,I 4 5. 'laiiV Cpnecaant i a manager to evaluate all work and Task Ide Task I Delivorables procedures followed while providing the ............... Produced services. • Quality is verified through independent ne•(eet �aliveeablae , !°client reviews by a qualified staff member Mansger of the processes, procedures, documentation, supervision, technical direction, and staffing associated with UP LeaA tecnn ce R °la n•,al Control ae�nevt� the project development. Project quality OCR - CuelAy is "built -in," not added on. • Quality work is the direct result of careful, properly sequenced, and supervised production, and continuous checking of each work element for completion and correctness by the task leader and project manager. Past Performance On Similar Proiects Kimley -Horn has a distinguished history of successfully completing projects. Our success is due to a combination of effective project management, strong technical expertise, and a steadfast quality control program. The following is a sampling of similar projects performed by Kimley -Horn; we believe these projects best illustrate our team's qualifications and relevant experience to the City of Sunny Isles Beach's traffic engineering services RFQ. TR300016411 -0_SunnylslesBCh_T 4McEngSdws.indd Page 2-4 a Kimley -Horn has a distinguished history of successfully completing projects. CM" Kimley -Horn IIIIIIIIIIIIIIIN and Associates. Inc. ,= Traffic CITY OF SUNNY ISLES BEACH Engineemgservices 3 Signal Warrant Analysis and FDOT PemiittingAssistance for Sigraal at 182nd Street and Collins Avenue, Sunny Isles Beach, FL Kimley -Horn performed a signal warrant analysis at the intersection of 182nd Street and Collins Avenue in Sunny Isles Beach. This proposed signal will serve the shopping center that will be served by the proposed new driveway that is the subject of this RFQ. We prepared a preliminary signal design and met with FDOT to discuss the need for this signal. Traffic Circulation Analysis at Heritage Park, Sunny Isles Beach, FL Kimley -Horn prepared a detailed analysis of traffic circulation conditions surrounding the new Heritage Park. Of particular concern to the City and its residents was queuing on Collins Avenue, traffic operations on Gallahad Dade Boulevard, and the valet circulation patterns of the nearby Ramada Resort on Collins Avenue. Kimley -Horn was able to provide an analysis that convinced nearby property owners that the traffic circulation in the area would not be negatively affected. Identification of Vehicular and Pedestrian Issues for the Proposed Sunny Isles Aquatic Center, Sunny Isles Beach, FL Kimley -Horn prepared a study which analyzed access, circulation, and pedestrian safety issues at the proposed Sunny Isles Aquatic Center. Improvements to Congested Intersections, Miami -Dade County, FL Kimley -Horn was retained by the Miami -Dade County Public Works Department (PWD) to perform traffic analyses and roadway design services for many of the locations identified by local leaders as the top 25 congested intersections in the County. Kimley -Horn studied intersections to identify the underlying cause of congestion, and then evaluated the benefits of recommended improvements and identified additional improvements (if necessary) to improve traffic flow. Our traffic engineering and roadway design staff pooled resources to help the PWD adhere to a rigorous schedule. We developed a study template that could be utilized for greater efficiency. Recommended traffic improvements focused on short-term, but high- benefit improvements such as median closures, turn lane improvements, and lane configuration enhancements. Congested intersections that were evaluated by the Kimley- Horn team included: • Sunny Isles Causeway at NE 26th, 28th, and 29th Avenues (North Miami Beach) • NW 167th Street at NW 2nd Avenue (North Miami Beach) ■ William Lehman Causeway at Biscayne Boulevard (Aventura) TR3000164. 11. 0_SunnylslesBch_TrafficEngServs. i ndd 4 Page 2 -5 Kimley -Horn and Associates. Inc. Tr c SUNNY CITY OF SUNNY ISLES BEACH ' EServices SR A1A (Collins Avenue) Pedestrian Corridor Study from 32nd Street to 38th Street, Miami Beach, FL The SR Al A (Collins Avenue) Pedestrian Corridor Study was commissioned by FDOT to evaluate the need for a pedestrian signal crossing of SR Al between 32nd Street and 38th Street in Miami Beach. The area along SR A1A between these two pedestrian crossings experiences a high level of pedestrian activity due to a variety of factors, including the proximity of several hotels and apartment buildings, the beach adjacent to SR Al A, a lack of convenient parking, and a high density of transit service. Within the study area, Collins Avenue is part of a one -way pair providing northbound traffic flow in three lanes for SR Al A. Sidewalks exist along both sides of Collins Avenue. Sidewalks are also provided along most side streets that cross SR Al between Collins Avenue and Indian Creek Drive, which provides southbound traffic flow in the area. SR A1A/Collins Avenue Resitrfacing (Phase A Miami Beach, FL Kimley -Horn provided design services for SR A1A/Collins Avenue from 26th Street to Indian Creek Drive in Miami Beach for FDOT District Six. Based on our team's detailed investigation of the corridor and deficiencies discovered, we presented District Six with a scope study report which included three improvement options: minimal, mid - range, and complete reconstruction of the corridor. The 3R design services provided to FDOT included roadway, signing and pavement marking, maintenance of traffic, drainage, and signalization plans. Project issues include milling and resurfacing, pedestrian /ADA compliance, parking, bike lanes, landscaping, and coordination with local agencies. The project included approval of design exceptions and variations, pavement design, and typical section package. tMEMEW TF3000164.11 -0 SunnylslesBch _Tri<fficEngServs.indd North Shore Area Roadway Improvements, Miami Beach, FL Kimley -Horn provided streetscape design, urban design, landscape architecture, roadway engineering, and transportation- related services for the design of approximately three miles of urban streetscape improvements in the North Shore area of Miami Beach. The area is currently undergoing a major resurgence both commercially and residentially. Initiated in 1989, this project has developed into a $16.5- million program of improvements, with an emphasis on enhancement of the downtown area and the pedestrian activity areas. One of the key components of this project was solving traffic congestion along a major arterial route, Collins Avenue, by upgrading the two - lane roadway to three lanes. Kimley -Horn was successful in obtaining more than $8 million in county and state funding in addition to a $1.6- million ISTEA grant through the Metropolitan Planning Organization for development of a 1.5 -mile bicycle /pedestrian corridor along the oceanfront. PP- Kimley -Horn Page 2-6 and Associates. Inc. Traffic CITY OF SUNNY ISLF,S BF,ACII ' EngineeMg Services Implementation Plan for the Northeast Corridor Traffic Flow Study, Miami -Dade County, FL f Kimley -Horn assisted the Metropolitan Planning Organization with developing an implementation plan that provides the framework for programming of transportation improvements in the northeast section l of Miami -Dade County. The plan included defining projects to the level required to determine costs, subsequently determining potential funding sources, and finally laying out a blueprint toward implementation. The roadway grid lacks continuity, with few roadways traversing the entire study area. The majority of north -south traffic is concentrated in three corridors: 1 -95, Biscayne Boulevard, and Collins Avenue. Five major east - west corridors serve as connections between 1 -95 and Biscayne Boulevard: Ives Dairy Road, Miami Gardens Drive, 167/163rd Street, 135th Street, and 125th Street. As travel demand grows in the study area, these corridors are expected to become increasingly congested; therefore prompting the prior effort to develop a series of transportation infrastructure improvements and policies to enhance mobility. The result of this study is a program of transportation improvements to address traffic congestion and, to some extent, provide alternatives to the single occupant automobile as a method of transportation. The improvements should be adopted into the appropriate plans and programs of the specified agencies. Dixie Highzua y /Olive Avenue Street Master Planning, West Palm Beach, FL This award - winning project involved developing a master - - - plan for the downtown street system in West Palm Beach. The FDOT allocated funds to resurface the City's streets ;f and contracted with design consultants to do the work, l Kimley -Horn acted as the City's program manager, �, # • r ��: ; ' � ' assisting them in formulating a wish list of design elements that would help to implement their long -term community F 1 vision for the downtown area. This list included such things i " y , ' „ n i `� as wider sidewalks to encourage pedestrian activity, on- street parking, traffic calming features, and landscape enhancements. The project also involved the redesignation die of US 1 to bypass downtown, and the transfer of downtown streets from FDOT control to City control. Kimley -Horn coordinated all utility relocation and upgrades to take advantage of the street reconstruction. Partnering with FDOT was critical to this project to ensure that minimum design criteria were met and that the City's goals and objectives were also upheld. We also assisted the City with identifying multiple funding sources for the improvements. The improvements have now been constructed. In February, 2005 a group of nationally- recognized representatives from the Federal Highway Administration (FHWA) visited this project. Focusing on intersection safety techniques, they noted the use of raised intersections, brick patterns, and narrowing of streets throughout the project. All of these techniques help create a more "city like" feel to the two state corridors. v PPP'=FJ Kimley -Horn TR3000164.11 0_ SunnylslesBch _TrafficEngServs.indd Page 2 -7 \ and Associates. Inc. j Traffic CITY OF SUNNY Engineemg 1 Worth Avenue Restoration, Palm Beach, FL Kimley -Horn served as site civil and traffic engineer for this exciting project that was brought to life by a group of property owners along Worth Avenue who wanted to revitalize the area and bring it back to its former glory. The project included: • Construction of a new roadway section • Replacement and modification of various underground utilities • Replacement of sidewalks with decorative tabby concrete • Landscaping and architectural elements throughout the corridor ISLES BEACH Services Traffic Signal System Design, Palm Beach County, FL i This project involved the completion of design for the installation of 101 traffic signals in the first phase of Palm Beach County's computerized signal system. The project included the development of plans and specifications for all hardware and software, and a complete communications system, including projection TV display and remote traffic sensors. The project team also designed special lighting, air conditioning, and fire protection features for the system's control center. Surveying Subconsultant Caulfield & Wheeler, Inc. will provide surveying services. Caulfield & Wheeler provides professional land surveying services throughout South Florida, including Miami -Dade County. Projects include numerous design surveys for governmental agencies, new construction and redevelopment projects, retail and mixed -use center revitalization and modifications, municipal centers and parks, prestigious planned -unit development and residential projects, and various schools and universities. Caulfield & Wheeler is one of the largest surveying providers in South Florida, with eight RTK/GPS survey crews. Project services provided range from design, as- built, boundary, topographic, tree, and design surveys; submerged land leases; mean high water and beach restoration surveys; final construction layout; and as- builting of completed improvements. Numerous route and location surveys have been performed for the design of roadway, water, sewer, drainage, and utility systems. Caulfield & Wheeler also uses powerful new technology to provide high- definition 3 -D laser scans and digital photographic backgrounds of existing and proposed improvements. This allows survey accurate locations of both horizontal and vertical surfaces and objects, as well as panoramic viewing or rotation of images, and drive or fly through videos of the scanned areas. This greatly enhances the accuracy of the data used in the planning and design phases of a project and is also a valuable tool for verifying construction phases and as -built information for a project. All roadway improvements, building setbacks, sides, features, and heights; free - standing walls or structures, fences, utility poles, and heights of overhead lines; and trees, shrubs, and other vegetation are located in a 3 -D model which is used to give an exact survey location of the improvements. Work can be performed either in the daytime or nighttime. Another valuable benefit of laser scanning is that it provides greater safety during the surveying process. The instrument can be set off to the side of busy roadways for locations without having PPI i Kimley -Horn TR300016411 -0 _ SunnylsfesBch —Tri icEngServs.indd Page 2 -8 \ m and Associates. Inc. _ Traffic CITY OF SUNNY ISLES BEACH Engineemg Services the crews go out into busy streets. In addition, the data that is obtained is a complete accurate 3 -D model of all improvements, thus eliminating the need for additional trips to verify information that may become important at a later time. Caulfield & Wheeler's Florida surveying project experience includes: ■ Surveying and Mapping Services, Florida Atlantic University - Provided services for a one -mile, four -lane roadway project with two parking lots as part of the new FAU football stadium; the project included roadway, electrical and utility infrastructure, sidewalks, drainage system, and landscaping ■ Atlantic Avenue and SR A1A, Delray Beach - Prepared a topographic survey that included existing asphalt, striping, sidewalks, building walls, dumpster, site light poles, and tree locations at coastal construction control line location ■ SW 1st Avenue /SW 6th Avenue /SW 3rd Avenue, Delray Beach - Provided topographic route survey of the right -of -way for the three streets; the scope of work included platted rights -of -way, lot numbers, block numbers, house numbers (if available), and dedicated easements ■ SW 6th Street Water Main Improvements, Delray Beach - Conducted a specific purpose survey of the property, including existing asphalt, striping, sidewalks, building walls, light poles, and tree locations 9 ■ NW 16th Street Water Main Improvements, Delray Beach - Prepared a boundary survey and topographic route survey for the property, including existing asphalt, striping, sidewalks, building walls, dumpster, site light poles, and tree locations Meeting and /or Exceeding the Requirements of RFQ 11 -11 -01 Section RFQ Requirement Kimley -Horn Advantage 1. Company Overview A firm with many disciplines, but one expertise— making our clients successful Established 44 -year history of success; we have the depth of resources, local experience, and diversity of expertise to handle this contract Understanding of local challenges Our project manager, Adam Kerr, P.E. will be in command and contract of the project at all times Project management approach that is team - oriented, no- nonsense, results- oriented, and saturated with top quality people who routinely produce superior results KHA is committed to maintaining a long -term relationship with the City founded on mutual trust, respect, and teamwork KHA takes pride in evaluating any unanticipated obstacles and making informed recommendations to overcome them before they impact the project's schedule and budget We are committed to the City and will strive to maintain the highest standards of ethics, courtesy, and communication We understand the City's background and history and share the City's goals and objectives KHA has the depth of resources, local experience, and diversity of expertise to provide the entire scope of services required for RFQ #11 -11 -01 TR3000164.11 -0_SunnylslesBch =T fl}cEnaS �lft�.,z.- �..,.� Page 2 -9 G=n Kimley -Horn and Associates. Inc. i Traffic CITY OF SUNNY ISLES BEACH Engineemg Services Section RFQ Requirement Kimley -Horn Advantage 2. Past Performance We have done our homework and know how to serve the City successfully! ✓ Prior experience with the City— just this past year, you selected us as one of your pre - qualified consultants, and that selection was based on several years of providing you outstanding and responsive traffic services ✓ As recently as the past few months, we have assisted you in seeking an FDOT approval for the curb cut that is the basis of this proposal ✓ Project manager Adam Kerr, P.E. and his team have worked with the City on various traffic engineering projects, including: Signal warrant analysis and FDOT permitting assistance for signal at 182nd Street and Collins Avenue Support to the City regarding traffic circulation analysis at the new Heritage Park >> Identification of vehicular and pedestrian issues for the proposed Sunny Isles Aquatic Center ✓ We have listened to your issues, asked questions, and earned your trust —and we want to continue to serve you! ✓ We feel we are best positioned to design and permit this driveway since we have a long history of working with you on this very location 3. Key Personnel Experienced project team with the qualifications and insight to address all aspects of the City's scope of services ✓ Established relationships and rapport with City staff ✓ Strong track record of proven project success in the area ✓ Local presence ✓ Extensive traffic engineering expertise ✓ Local area surveying subconsultant Caulfield & Wheeler, Inc. 4. Approach Creativity and innovation to help solve problems and develop solutions Methodology ✓ Having written the project's original scope of services, Kimley -Horn is thoroughly familiar with the project's history and issues regarding designing and permitting the driveway entrance on Collins Avenue (SR Al A) ✓ Thorough understanding of the critical schedule, project issues, and client needs ✓ Understanding of what it will take to deliver the project on time ✓ Understanding of external factors that could impede progress, such as stakeholder issues or regulatory issues ✓ Realistic internal evaluation of our resources ✓ Depth of resources to manage multiple assignments and accelerated production schedules ✓ Practical, milestone -based staffing plan ✓ Established relationships with critical -path permitting and regulatory agencies C =" Kimley -Horn u_ficEngSefvs.indd Page 2-10 �/ , and Associates. Inc. Section RFQ Requirement Kimley -Horn Advantage 5. References Much of KHA's success over the last four decades is directly related to our efforts to perform high quality, timely services for all or our clients ✓ Our references will tell you that we listened to their needs, met their schedules, accomplished their missions, and delivered results: >> Project Manager Lyn Forster of Florida Atlantic University stated that "Working with Kimley -Horn on this project and other road improvement projects in recent years is a reminder of their value and the confidence we have in their great work" >> City of Boynton Beach's Senior Planner Hanna Matras was "pleased with the professional services they (KHA) have provided and would recommend them to any agency looking to create a TCEA' City of Cape Coral's Transportation Manager Steve Neff stated that, "their (KHA) company and its representatives have been conscientious and thorough on their work" 6 Office Locations Kimley -Horn offers clients the individual, personal service that you would expect from a local firm, coupled with the manpower and technical resources of a nationally- ranked engineering firm ✓ More than 1,500 employees in 57 offices in 17 states offering a full range of consulting services to local, regional, national, and international clients; in Florida alone, there are nearly 400 employees in 17 offices ✓ KHA's West Palm Beach office will serve as the primary office responsible for the actual production of the work related to this project in order to provide a strong local presence and maximize our local staff ✓ Additionally, staff from any of our other 16 KHA Florida offices will provide support as needed to ensure timely completion and fulfillment of project Additional Information Outstanding Accomplishments For more than 40 years, Kimley -Horn has received a variety of awards for its professional accomplishments in terms of both project excellence and exceptional management practices. In 2010, Engineering News - Record ranked Kimley -Horn in the top 12 transportation firms. In recent years, we were awarded the Management Achievement Award, Excellence in General Management by the Professional Services Management Association for our Culture and Philosophy Training and Continuous Quality Improvement Day. This internal strength is reflected in the high - quality services that we offer our clients. Listed below are just a few of the relevant recent transportation awards for which the firm has been recognized during the past several years. • Award of Merit (Open Space Category), American Society of Landscape Architects, Florida Chapter: South Collier Boulevard Improvements (2008) • Grand Award, Florida Institute of Consulting Engineers: 1 -295/ Blanding Boulevard Improvements, FDOT District Two (2007) `- Kimley -Horn TH3000fficEn gSelvs indd .. � ,. Page 2 -11 � � � and Associates. Inc. Traffic CITY OF SUNNY Enoneemg Grand Award, rioriaa institute OT uonsuiting Engineers: SunPass Challenge, Florida's Turnp Enterprise (2006) • Grand Award for Engineering Excellence, American Council of Engineering Companies o North Carolina: Burlington- Graham Computeriz Traffic Signal System (2005) • Award of Merit, American Society of Landscal Architects, Florida Chapter: West Tharpe Street Corridor Study (2005) Exceeding Our Clients' Expectations As illustrated by the overview of services and projects cited throughout this section, the Kimley -Horn team is well positioned to serve the City on its Traffic Engineering Services RFQ. With established relationships and rapport with City staff, local presence, a strong track record of proven project success in the area, and an experienced and specialized project team, Kimley -Horn knows how to successfully. We look forward to teaming with the City on this important project. ISLES BEACH Services Schedule of Proposed Services fflflRP( 5TREIT IMPROVING THE WAYYOU MOVE serve the City The preparation of a detailed project schedule taking all anticipated tasks into account serves as a critical component to meet the City's Kimley -Horn is confident deadlines. Kimley- Horn's extensive traffic engineering related experience in its ability to monitor throughout Florida allows us to make certain we fully comprehend the project schedules to meet the required tasks that must be completed and timeframes associated with City's expectations and we them. are prepared to commit the When required, our team can accelerate work to meet a change in necessary resources to ensure project schedule; this process is used frequently when workloads that your projects stay on require extra personnel. It allows our team to be flexible and be able to schedule and within budget. react to all types of scheduling changes. Kimley -Horn is confident in its ability to monitor project schedules to meet the City of Sunny Isles Beach's expectations and we are prepared to commit the necessary resources to ensure that your projects stay on schedule and within budget. Kimley- Horn's project schedule for RFQ 11 -11 -01 is provided on the following page. t TR3000164.11 A _SunnylslesBch— TrdfficEngServs.i ndd Page 2 -12 C=n Kimley -Horn and Associates. Inc. ) I ) ) ) 1 Traffic CITY OF SUNNY ISLES BEACH I i �i i li l i t Enoneemg Services Project Schedule City of Sunny Isles Beach RFQ No. 11 -11 -01 Portion of Work Duration (business days) Notice to Proceed 0 Survey and Record Search 10 Prepare Conceptual Plan 5 Pre - Application Meeting with City 1 Adjust Plan per City Comments 5 Pre - Application Meeting with FDOT with Updated Plan 1 Begin Utility Coordination 0 Prepare Permitting Plans and Calculations 15 Submit for Permit Review (one calendar month review) City of Sunny Isles Beach FDOT Driveway FDOT Drainage MDSASD MDCDER Fire Department 20 Respond and Address First Round of Comments from All Agencies 10 Second Review Period (one calendar month review) 20 Respond and Address Second Round of Comments from All Agencies 10 Second Review Period (one calendar month review) 20 Complete Utility Coordination 0 Finalize Construction Documents Incorporating Permitting Changes and Utility Coordination 5 TOTAL (business days) 122 TOTAL (weeks) 25 /M" Kimley -Horn TR3000164. 11. 0_ SunnylslesBch_TrfficEngSormindd Page 2 -13 1 `� and Associates. Inc. Project Team Organization Traffic CITY OF SUNNY ISLES BEACII En&eemgservices As indicated by the organization chart on the following page, we have brought together a team of experts based on the needs outlined in the scope In addition to our hey of services. Our team members are available immediately to begin working to personnel discussed in provide the City of Sunny Isles Beach traffic engineering services. Our project manager, Adam Kerr, P.E., will be responsible for the coordination of all this section, staff from project efforts. any of Kimley- Horns 17 Florida offices In addition to our key personnel discussed in this section, staff from any of will provide support Kimley- Horn's 17 Florida offices will provide support as needed to ensure as needed to ensure timely completion and fulfillment of project. timely completion and The following team matrix highlights the specific in -house services that our key fulfillment of project. project team members can provide. TR�000�sa �i-o_sunnyisiesecn_T fficEngservsJndd Page 3-1 { C=n Kimley -Horn and Associates. Inc. � c - o Project Team Member Li -° (D, u 0 0) U C C 0) U W (� Q C T) N Q D CU O X W O cn Adam Kerr, P.E. ✓ ✓ ✓ ✓ ✓ ✓ Mike Spruce, P.E. ✓ ✓ ✓ ✓ ✓ Juan Jimenez, PE. ✓ ✓ ✓ ✓ ✓ Jason Webber, EIT (PA) ✓ ✓ ✓ ✓ ✓ ✓ Chris Falce, E.I., LEED° AP ✓ ✓ ✓ ✓ ✓ John Hillman, E.I. ✓ ✓ ✓ ✓ David Lindley, PLS (Caulfield & Wheeler, Inc.) ✓ TR�000�sa �i-o_sunnyisiesecn_T fficEngservsJndd Page 3-1 { C=n Kimley -Horn and Associates. Inc. U Q w 'w z w O H U a� Q U = O NQ Y � 11 u Traffic CITY OF SUNNY En&eerie g Experience and Qualifications of Key Personnel Adayri Kerr, P.E. - Project Mari ger Professional Qualifications: Professional Engineer in Florida and Illinois Education: Bachelor of Science, Civil Engineering, Clemson University Years Experience: 9 Years with KHA: 9 Professional Associations: Institute of ISLES BEACH Services Adam Kerr's relevant Florida projects include: • Signal Warrant Analysis and FDOT Permitting Assistance for Signal at 182nd Street and Collins Avenue, Sunny Isles Beach • Traffic Circulation Analysis at the New Heritage Park, Sunny Isles Beach • Vehicular and Pedestrian issues for the Proposed Sunny Isles Aquatic Center Transportation Engineers • Belvedere Road from East of Jog Road to Military Experience: Adam is a transportation engineer experienced in •Trail, west Palm Beach General Traffic Services, Boca Raton a variety of transportation planning projects in South Florida. • General Traffic Services, Jupiter His experience includes preparation of major developments • Traffic Signal Designs, Palm Beach County of regional impact (DRIs), FDOT action plan analyses, data • US 1 Corridor Modification Study, Delray Beach collection coordination, and computer modeling. He has prepared traffic studies, signal warrant analyses, and traffic signal designs throughout Palm Beach County and South Florida. He serves as the City Traffic Engineer for the City of Greenacres and provides traffic and planning consulting services for the City of Boca Raton. Adam has assisted the City of Sunny Isles Beach on numerous projects, including analysis of traffic operations at the site that is the subject of this RFQ. He has also prepared a signal warrant analysis and traffic signal design at an intersection along Collins Avenue and analyzed the site circulation and impacts of the proposed Heritage Park with regard to the local street network and Collins Avenue. Adam has served as a consultant to the Town of Jupiter, providing review of traffic studies, planning studies, and signal design expertise. He has prepared nearly a dozen signal designs, many of which involved FDOT coordination.. Mike Spruce, P.E. - Principal -in- Charge Professional Qualifications: Professional Engineer in Florida Education: Master of Science, Agricultural Engineering, Auburn University; Bachelor of Science, Agricultural Engineering, University of Florida Mike Spruce's relevant Florida projects include: • US 1 Corridor Modification Study, Delray Beach • 2000 Roadway Improvements Bond Program, Southeast /Southwest Infrastructure Improvements, Delray Beach • Boynton Beach Boulevard Extension and Promenade, Boynton Beach Years Experience: 19 Years with KHA: 16 • Florida Atlantic University Continuing Minor Civil Professional Associations: Florida Engineering Society; Engineering Projects National Society of Professional Engineers • Industrial Avenue Corridor Stormwater Experience: Mike is a lead engineer in the firm's Boca - Delray Improvements, Boynton Beach office specializing in municipal infrastructure, redevelopment, • Cypress Drive Drainage, Palm Beach County and drainage projects. His experience includes stormwater • Harbor Drive Drainage Evaluation, Delray Beach management systems, drainage, hydraulic modeling, hydrologic evaluations, and construction phase services. As a project manager, his experience includes leading multidisciplinary teams for small and large municipal infrastructure, neighborhood improvement, and recreational facility projects. Mike has been a key team member for Kimley- Horn's involvement with the City of Delray Beach, the CRA's improvements to US I, Boynton Beach's Seacrest Boulevard project, and the redevelopment of Lake Worth Beach. Cl_Fl Kimley -Horn TF3000164. 11-0 _ SunnylslesBch _Tr9fficEngServs.indd Page 3-3 and Associates. Inc. 4 Traffic CITY OF SUNNY Engineemg Juan Jimenez, P.E. - Quality Assurance/Quality Control Professional Qualifications: Professional Engineer in Florida Education: Bachelor of Science, Civil Engineering, Florida International University Years Experience: 17 Years with KHA: 11 Professional Associations: American Society of Civil Engineers; Florida Engineering Society; National Society of Professional Engineers ISLES BEACH Services Juan Jimenez's relevant Florida projects include: • Southwest Neighborhood Plan, Parking Lots, Sidewalks and Street Repair, Homestead • Streetscape for SW 4th Street, Homestead • Lincoln Road Closure, Miami Beach • Miami River Greenway, Miami • North and South River Drives, Miami • NW 37th Avenue Water and Sewer Improvements, Miami -Dade County • SR 710 /Beeline Highway Design, FDOT District Four Additional Languages: Spanish Experience: Juan is a civil engineer experienced in municipal and utility engineering consulting in South Florida— mainly in Miami -Dade County. His broad project experience includes water supply and distribution, wastewater j collection and transmission, stormwater management, roadway, general civil engineering, and land development. Juan brings technical analysis and design expertise, as well as sound project management experience in the preparation of work plans and schedules, permit documents, bid /contract documents, specifications, opinions of construction costs, and quality control. He also understands the importance of maintaining clear and constant communication with clients through all phases of the project. Juan has been involved with streetscape projects such as the Miami River Greenways and SW 4th Street Streetscape (Homestead), which integrate utility and roadway design with pedestrian access and right -of -way beautification. Jason Webber, EIT (PA) - Project Engineer Professional Qualifications: Engineer -in- Training in Pennsylvania Education: Bachelor of Science, Civil Engineering, Pennsylvania State University Years Experience: 7 Years with KHA: 5 Jason Webber's relevant Florida projects include: • Falkenburg Road /Progress Boulevard Extension, Hillsborough County • Hayes Road Extension, Oldsmar • Barry University Master Plan, Miami Shores • Broward College Campus -Wide Master Plan, Broward Professional Associations: American Society County of Civil Engineers; Florida Engineering Society • Continuing Minor Civil Engineering Projects, Florida Experience: Jason has seven years of experience in the Atlantic University surveying industry. He is experienced with many aspects of civil design services, including site design, stormwater management and drainage design, sewage collection design, water distribution systems, and agency permitting. He is also proficient with AutoCAD, Land Desktop, Softdesk, Solidworks, Sokkia total station, Topcon total station, and Microsoft Office. Chris Falce, E.L, LEED° AP - Project Analyst Professional Qualifications: Engineering Intern in Florida, LEED°- Accredited Professional Education: Bachelor of Science, Civil Engineering, University of Miami Years Experience: 6 Years with KHA: 4 Professional Associations: American Society of Civil Engineers; Florida Engineering Society TR300016411- o_ SunnylslesBeh— TIfficEngSeivs.indd Page 3-4 Chris Falce's relevant Florida projects include: • Lincoln Road Closure, Miami Beach • 1111 Lincoln Road Parking Garage and New World Symphony Parking Garage, Miami Beach • Science Classroom Complex at Florida International University, Miami -Dade County • Wolfson Campus Student Support Center, Miami - Dade College, Miami C_I \ Kimley -Horn and Associates. Inc. Traffic CITY OF SUNNY ISLES BEACH Engmeemg services Experience: Chris has six years of experience in South Florida land development. He also has significant experience with regulatory agencies and permitting processes in Miami -Dade County. In addition, he is experienced with LEED® projects and implementation of sustainable design elements. John Hillman, E.I. -Project Analyst Professional Qualifications: Engineering Intern in Florida Education: Bachelor of Science, Civil Engineering, University of Florida Years Experience: 1 Years with KHA: 6 months Professional Associations: American Society of Civil Engineers Experience: John is a project analyst. His software experience includes AutoCAD (versions 2005 -2011) and MATLAB. John Hillman's relevant Florida projects include: • US 1 (Federal Highway) Interim and Final Enhancements, Delray Beach • Minor Civil Engineering Projects, Florida Atlantic University • Broward College Campus -Wide Master Planning, Broward County • Palm Beach State College South Campus Parking, Lake Worth Subconsultant Experience and Qualifications Caulfield & Wheeler, Inc. will provide surveying services. David Lindley, PLS will serve as the point of contact for RFQ 11- 11 -01. David Lindley, PLS - Director of Sitrveying Professional Qualifications: Professional David Lindley's relevant Florida projects Surveyor and Mapper, Florida; Professional include: Land Surveyor, North Carolina • Davis Landing Phase 1 and 2, Lake Worth Education: Associate of Science, Land • Bathymetry Resurvey and Data Integration/Transitional Surveying, Palm Beach Community College; Area Data Acquisition, Lake Okeechobee United States Army Surveyor : Plat Review Consulting, Delray Beach US 441, Wellington Years Experience: 27 Years with Caulfield & Wheeler: 26 • Atlantic Avenue and Al A, Delray Beach Professional Associations: Florida Surveying & Mapping Society; American Congress on Surveying and Mapping; National Society of Professional Surveyors Experience: David has been providing land surveying services at Caulfield & Wheeler since 1985, including geodetic control surveys, route and location surveys for surface and subsurface mapping of existing utilities for design plan base maps, sketch and legal descriptions for easements and parcel acquisition, boundary surveys, accident surveys, wetland mapping, stormwater mapping, topographic surveys, tree surveys, and platting. TR3000164.11A_SunnylslesBch —rr fficEngServs.indd Page 3-5 Kimley -Horn and Associates. Inc. Traffic CI'T'Y OF SUNNY ISLES 13EAC11 Engineering Services Relevant Experience Signal Warrant Analysis and FDOT Permitting Assistance for Signal at 182nd Street and Collins Avenue, Sunny Isles Beach, FL — Performed a signal warrant analysis at the intersection of 182nd Street and Collins Avenue in Sunny Isles Beach. This proposed signal will serve the shopping center that will be served by the proposed new driveway. We prepared a preliminary signal design and met with FDOT to discuss the need for this signal. Traffic Circulation Analysis at Heritage Park, Sunny Isles Beach, FL Prepared a detailed analysis of traffic circulation conditions surrounding the new Heritage Park. Of particular concern to the City and its residents was queuing on Collins Avenue, traffic operations on Gallahad Dade Boulevard, and the valet circulation patterns of the nearby Ramada Resort on Collins Avenue. Kimley - Horn was able to provide an analysis that convinced nearby property owners that the traffic circulation in the area would not be negatively affected. ) Identification of Vehicular and Pedestrian Issues for the Proposed Sunny Isles Aquatic Center, Sunny Isles Beach, FL — Prepared a study that analyzed access, circulation, and pedestrian safety issues at the proposed Sunny Isles Aquatic Center. Broward Avenue and Volusia Street Signal Design, Florida Atlantic University, Boca Raton, FL — Project engineer. Kimley -Horn designed a traffic signal at the intersection of Broward Avenue and Volusia Street on the } FAU Boca Raton campus. The signal is a trombone -style mast arm. The signal serves a busy intersection with a significant amount of pedestrian traffic. Kimley -Horn worked closely with the trombone -style mast arm manufacture to ensure that the design would meet the wind loading requirements for coastal Florida. Belvedere Road from East of Jog Road to Military Trail, West Palm Beach, FL — Project analyst. Kimley -Horn prepared a traffic study for the expansion of a four -lane facility to six lanes, We then provided services for an alignment and right -of -way study to add one additional lane and assess the impacts and costs associated with it. Okeechobee Road (US 27 /SR 25) Action Plan, Level 5, Miami -Dade County, FL — Developed long -range future traffic projections for Okeechobee Road corridor. Provided transportation modeling, intersection analyses, and diversion analyses for year 2025 conditions. Florida Atlantic University (FAU) Continuing Minor Civil Engineering (Multiple Projects), FL — Kimley -Horn is providing a variety of services for FAU at its multiple Florida campuses. Provided traffic engineering services for the FAU Boca Raton Campus Broward Avenue and Volusia Street Traffic Signal project in Boca Raton. The project involved design of a new traffic signal at the intersection of Broward Avenue and Volusia Street on the FAU Boca Raton Campus. TR3000164 .11- o— SunnylslesBeh_TES resumes.1ndd Adam Kerr, P.E. Project Manager Special Qualifications + Has nine years of experience in transportation planning and traf- fic engineering gained through a variety of transportation planning projects, including traffic impact analyses, FDOT action plan analysis, data collection coordi- nation, and computer modeling . Proficient in highway capac- ity software, Synchro, Florida Standard Urban Transportation Model System (FSUTMS) traffic modeling, and Signal 2000 Professional Credentials r 1 Bachelor of Science, Civil Engineering, Clemson University Professional Engineer in Florida and Illinois Professional Organizations Institute of Transportation Engineers PFP� =" Kimley -Horn �� and Associates. Inc. Adam Kerr, P.E. Relevant Experience cons. Transportation Element, Comprehensive Plan Amendment, Greenacres, FL Served as project engineer. KHA performed the update to the Transportation Element for the City of Greenacres Comprehensive Plan. KHA used the WPBUSA FSUTMS planning model to forecast future traffic conditions in order to determine future roadway levels of service. The WPBUSA FSUTMS planning model was modified to determine the short- and long -range needs for the City roadway network and identify mitigation measures. KHA also provided direction to the City regarding its designation of future motorized and non - motorized traffic circulation systems with t the improvement to those existing systems throughout the City of Greenacres. SR 7 Corridor Master Plan, Palm Beach County, FL — Developed a long -range plan to guide future growth and redevelopment along a corridor which was operating at over - capacity conditions at its ultimate width. The document outlined measures to improve mobility along the corridor through optimized transit service, car - pooling programs, and promotion of mixed -use development and redevelopment. The planning process was coordinated with Palm Beach County, the Village of Wellington, the Village of Royal Palm Beach, the City of Greenacres, and individual land owners along the corridor. US 1 Corridor Modification Study, Delray Beach, FL — Prepared an analysis of conditions prior to and after a lane reduction on a major corridor through Delray Beach. Aspects of the study included traffic volumes at intersections and generally along the corridor, speeds, and accident data. The corridor study was part of a larger project which analyzed the qualitative effects of decreased number of travel lanes, increased sidewalk width, and increased landscaping. The project involved extensive public coordination with the City of Delray Beach, FDOT, and the Delray Beach Community Redevelopment Association. Florida Research Park Traffic Analysis, Palm Beach County, FL — Developed in -depth development of regional impact level traffic analysis to determine the impacts of the Scripps Research Institute at Florida Research Park. The project involved a comprehensive review and analysis of long -term traffic patterns in the northwestern portion of Palm Beach County and southern Martin County. Provided extensive FSUTMS modeling support as part of the analysis. Coordinated the analysis and results with FDOT, Treasure Coast Regional Planning Council, and Palm Beach County. SR 7 /Pioneer Road Signal, Royal Palm Beach, FL — Served as project manager. Kimley -Horn designed a traffic signal at the intersection of SR 7 and Pioneer Road in Royal Palm Beach. The mast -arm design included a dual - arm design, with one of the arms spanning a six -lane approach to the intersection. The design required special consideration for drainage and topography. Construction had to be coordinated with the widening of SR 7, as well as the widening of Pioneer Road. Roebuck Road, SR 7 to Jog Road, West Palm Beach, FL — Served as signal designer. Kimley -Horn provided drainage analysis and design, signing and pavement marking, and signal plans. We were also responsible for environmental permitting services Traffic Concurrency Management Database and Report, Miami Lakes, FL — Created and maintained a database to inventory the existing and allowable traffic within the Town of Miami Lakes. Assisted in developing a methodology for determining traffic concurrency in the Town. Toney Penna Drive /Pennock Lane Signal Design, Jupiter, FL — Project manager. Kimley -Horn designed a traffic signal at the intersection of Toney Penna Drive /Pennock Lane for the Town of Jupiter. This is the first and only signal that the Town maintains. Kimley -Horn worked closely with the Town to design a decorative pole and arm structure, with luminaries, fluted poles, curved arms, and attachments for civic banners. Kimley -Horn worked closely with the manufacture of the decorative poles and arms to ensure structural integrity meeting the wind loading requirements. Various Traffic Signal Designs, Palm Beach County, FL — Prepared plan sets and opinions of probable cost for several private sector developers. Coordinated the structural analysis, geotechnical analysis, and the permit and approval processes. Designs were on major thoroughfares and required agency approval from FDOT, Palm Beach County, municipalities, and various utility companies. PP- 1111110 Kimley -Horn TR3000164.11 -0_SunnylslesBch_TES resumesAndd 1 1111111• and Associates. Inc. Traffic CITY OF SUNNY ISLES RFACII � L e Engineering Services Relevant Experience US 1 Corridor Study, Delray Beach, FL — Project engineer on the Kimley - Horn team who was responsible for this study and conceptual design of several blocks of US 1 in Delray Beach. The City and its Community Redevelopment Agency (CRA) adopted the Downtown Delray Beach Master Plan, which has as one of its key elements a reconfiguration of the two one - way segments of US 1 from three lanes to two lanes. Accordingly, Kimley - Horn was retained to evaluate potential changes to the lane configuration along southbound (NE /SE 5th Avenue) and northbound (NE /SE 6th Avenue) segments of US 1 from north of Linton Boulevard (SE 10th Street) to George Bush Boulevard. Kimley -Horn developed alternatives, forecast future traffic volumes for review with the City and the CRA, and led several public involvement workshops at which detailed traffic engineering and design data were presented. 2000 Roadway Improvements Bond Program, Southeast /Southwest Area Infrastructure Improvements, Delray Beach, FL — Served as project manager and lead engineer on eight residential projects involving roadway, water main, and drainage improvements. Project duties include directing field data collection, detailed design of improvements, preparation of plans and specifications, and bid phase services. Boynton Beach Boulevard Extension and Promenade, Boynton Beach, FL — Project engineer for the extension of Boynton Beach Boulevard to the Intracoastal Waterway and the creation of a boardwalk along the water. Our team is involved in the planning, design, coordination, and plans production of this streetscape project funded by the City of Boynton Beach Community Redevelopment Agency. Unique aspects of the project include extensive environmental permitting, utility coordination for future development, and traffic calming measures. Included in the scope of work was the design of the roadway, utilities (including water, sewer, drainage, and electric), the layout and design of a 500 -foot promenade /boardwalk, and 1,300 feet of riverwalk on the Intracoastal. Florida Atlantic University (FAU) Continuing Minor Civil Engineering (Multiple Projects), FL — Kimley -Horn is providing a variety of services for FAU at its multiple Florida campuses. Projects performed in conjunction with this contract include providing civil engineering services for the FAU Boca Raton Campus Broward Avenue and Volusia Street Traffic Signal project for Boca Raton where services included design of a new traffic signal at the intersection of Broward Avenue and Volusia Street on the FAU Boca Raton Campus. For the FAU Boca Raton Campus Leet Street Sidewalk project, provided design and construction of 1,800 linear feet of 8- foot -wide sidewalk from the Engineering Building to the Recreation Center. The project included filling of existing adjacent swales and modification to existing SFWMD permits. For the FAU Boca Raton Campus NW 6th Avenue Improvements project, TR3000164 .11.0_Sunny1s1esBch_TES resumes.indd Mike Spruce, P.E. Principal -in- Charge Special Qualifications • Has 19 years of experience spe- cializing in municipal stormwater, roadway, and drainage projects • Project manager and client ser- vice manager for several South Florida municipalities • Experience leading multidisci- plinary project teams Professional Credentials Bachelor of Science, Agricultural Engineering, University of Florida Master of Science, Agricultural Engineering, Auburn University Professional Engineer in Florida Professional Organizations Florida Engineering Society National Society of Professional � Engineers PP-11111111111111" Kimley -Horn \�I , and Associates. Inc. Mike Spruce, P.E. Relevant Experience cont. provided improvements to NW 6th Avenue from NW 28th Street to NW 32nd Street within the Boca Raton Campus. For the Harbor Branch Campus Entry Road and Guardhouse Reconstruction project in Fort Pierce, KHA provided the design and permitting of the pavement reconstruction of the entry road from US 1 to the Barrows Building at the Harbor Branch Campus. The design included reconstruction of the roadway surrounding the guardhouse. Permitting for this project included SFWMD and the Florida East Coast Railway. Industrial Avenue Corridor Stormwater Improvements, Boynton Beach, FL — Served as project manager on a stormwater, water main, and roadway improvement project for the City of Boynton Beach. Project involved the hydraulic and hydrologic modeling of approximately 18 acres of an existing industrial development and an adjacent residential area; detailed design of stormwater conveyance and retention facilities; detailed design of roadway improvements; and permitting, bid phase, and construction phase services. Responsibilities included leading the stormwater modeling and design team. Cypress Drive Drainage, Palm Beach County, FL — Project engineer for the redesign of the drainage system in a 70 -acre area of commercial and industrial zoning. The area, which includes Cypress Drive, Tequesta Drive, and Old Dixie Highway, suffered from frequent and severe flooding, and Kimley- Horn's role as consultant was to develop an outfall that would provide relief to the area. The project was complicated by the fact that retention and detention requirements are now more stringent in areas with commercial and industrial zoning. There was also no vacant property available for detention. Run -off storage was achieved by the construction of approximately 2,000 feet of exfiltration trench that ultimately discharges into the Loxahatchee River. The exfiltration trench averages 20 feet in width and 10 feet in depth and transmits stormwater via two 36 -inch perforated pipes. Harbor Drive Drainage Evaluation, Delray Beach, FL — Served as project manager and lead engineer on this residential drainage project. Project duties include directing data collection, stormwater modeling, and recommendation of alternative improvements. Seacrest Neighborhood Improvement Program, Delray Beach, FL — Served as project manager and quality control reviewer for construction plans for Phase IV of the City of Delray Beach's Seacrest Neighborhood Improvement Program. The project included more than $1.5- million worth of improvements and upgrades to aging infrastructure on 18 streets within the existing Seacrest neighborhood. The improvements and upgrades included installation of potable water distribution mains and service connections, abandonment and relocation of existing water mains and service connections, installation of sewer mains with service connections, asphaltic concrete pavement overlays and reconstructions, concrete sidewalks, traffic calming measures, stormwater drainage improvements, retention ponds, driveway replacements, swale improvements, landscaping and irrigation, and associated miscellaneous improvements. South Florida Water Management District (SFWMD) Multidisciplined Professional Services, FL— Project engineer on the Kimley -Horn team that has a three -year, multi - disciplinary professional services contract to support the SFWMD's Everglades Construction Project, development and implementation of Phase II Technologies, and compliance with the District's obligations under the Everglades Forever Act. The scope of services for SFWMD may include detailed design review, planning services, detailed engineering, and structural and other inspections, in addition to the firm's basic consulting services. Kimley -Horn was selected for this contract based on the firm's strong history with SFWMD, its extensive work for the District, and its thorough understanding of the unique needs of the area. TR3000164 .1 i- 0_Sunny1s1es8ch_TES resumes.indd PP-MFI Kimley -Horn \= and Associates. Inc. - _ _' Traffic CITY OF SUNNY ISLES 13EAC11 Engineering Services Juan Jimenez, P.E. Quality Assurance /Quality Control Relevant Experience Southwest Neighborhood Plan, Parking Lots, Sidewalks and Street Repair, Homestead, FL — Served as design engineer responsible for the design and preparation of construction documents and specifications, permitting, bidding, and construction phase services for the construction of two parking lots and 500 linear feet of roadway improvements along NW 2nd and 3rd Streets. Improvements consisted of on- street and off - street parking, paving and roadway reconstruction, drainage, lighting, irrigation, and landscaping. Streetscape for SW 4th Street, Homestead, FL — Project manager for the design of roadway and streetscape improvements following the SW 4th Street Master Plan. The project consisted of roadway resurfacing, right-of- way beautification, on- street parking, streetscape, landscape, and irrigation improvements along SW 4th Street between SW 2nd and SW 7th Avenues. The project also included repair of existing drainage utilities and traffic signage. Lincoln Road Closure, Miami Beach, FL — Serving as civil engineer. This project is a joint- venture between the City of Miami Beach and UTA Management, LLC. The 1000 -1100 Block of Lincoln Road has been closed to vehicular traffic to allow for the extension of the Lincoln Road Pedestrian Mall. The mall is being extended west, from Lenox Avenue to Alton Road, and will y ) include a new pedestrian plaza. The design also includes four water gardens, and streetscape and infrastructure improvements. Kimley -Horn is providing due diligence, civil engineering, landscape architecture, permitting, traffic signal modifications, and lighting and electrical design services for this project. Miami River Greenway, Miami, FL — Served as project engineer and assisted with the design of roadway improvements, including production work and utility coordination. The KHA team was retained to redesign North and South River Drives in the City of Miami to incorporate a continuous greenway along the Miami River. The firm developed schematic designs and 30% construction documents based on a previous visioning master plan created by Greenways, Inc. The new Miami River Greenway will serve as a pedestrian linkage for the many communities along the river to the downtown. Under this contract, Kimley -Horn developed typical cross - sections and plan view graphics that incorporated important urban design elements along the greenway. North and South River Drives, Miami, FL — Served as project engineer. Kimley -Horn was retained to redesign North and South River Drives in the City of Miami to incorporate a continuous greenway along the Miami River. The firm developed schematic designs and 30 percent construction documents. Additional aesthetic improvements included site furniture, pedestrian lighting, and preliminary landscape recommendations to enhance the overall quality and provide a definable image for the Miami River Greenway. In addition to landscape architecture and urban planning, Kimley -Horn also provided civil engineering, roadway design, and stormwater retrofitting services for this Special Qualifications • Has 17 years of diverse engi- neering and project manage- ment experience • Experienced with quality control review of projects with constant client interaction through all phases Professional Credentials Bachelor of Science, Civil Engineering, Florida International University w Professional Engineer in Florida Professional Organizations American Society of Civil Engineers Florida Engineering Society National Society of Professional Engineers PP'11111111111111" Kimley -Horn TR3000164. 11- QSunnylsles13ch_TESresumes.indd �= and Associates. Inc. Juan Jimenez, P.E. Relevant Experience cont. project. With these in -house capabilities, the design team was able to produce high - quality 30 percent construction drawings for the City within the anticipated timeframe. NW 37 Avenue Water and Sewer Improvements, Miami -Dade County, FL — Served as KHA project manager. This project is part of the Miami -Dade Water and Sewer Department's (MDWASD) "Needs Assessment Program" (NAP). It consisted of the preparation of a technical memorandum to evaluate alternatives and recommend improvements within a 2,000 -acre area of unincorporated Miami -Dade County that had little or no existing water and sewer infrastructure. Improvements were necessary to expand the capacity of the existing system and sustain future economic redevelopment within the area. Additionally, though the project area is within unincorporated Miami -Dade County, portions of it receive water service via water mains owned and operated by the adjacent City of Hialeah. Part of our services included developing a plan to disconnect services from the City of Hialeah and reconnect them to the County's water distribution system. SR 710 /Beeline Highway Design (East and West), FDOT District Four — Served as project engineer. The combined length of both projects is 5.33 miles. The western project consists of the addition of two new lanes to provide a four -lane divided rural roadway, along with the replacement of the existing two -lane bridge and the construction of a new two -lane parallel bridge. The eastern project consists of the new construction to provide a four -lane divided urban roadway. 48 -Inch Force Main Along Sunny Isles Boulevard, North Miami, FL — Project engineer for the design of a 48 -inch force main along Sunny Isles Boulevard from PS 426, just west side of the Intracoastal Waterway, to the WASD North District Wastewater Treatment Plant. The project consists of installing approximately 7,600 linear feet of a 48 -inch diameter DIP (ID) force main along Sunny Isles Boulevard and 2,600 linear feet of twin 48 -inch diameter HDPE (OD) force mains through the Oleta River State Recreation Area. The project required an aerial crossing of the Oleta River and extensive coordination with FDEP for the mitigation of impacted natural resources. Biscayne Boulevard Parallel 36 -Inch Force Main, Miami, FL — Served as project engineer for the design and permitting of approximately 20,000 linear feet of 36 -inch ductile iron force main in the cities of North Miami and North Miami Beach, Florida. This force main will serve as backup to the existing 30 -inch and 20 -inch force mains running along West Dixie Highway. Kimley- Horn's design provided for a redundant connection between Pump Station 423 (discharge point) and the existing 72 -inch PCCP force main located near the intersection of NE 19th Place and NE 159th Street. Kimley -Horn also designed a subaqueous canal crossing across Snake Creek Canal as part of this project. PP1111111111110" Kimley -Horn TR3000164 .11.0_Sunny1s1es8ch_TES resumes.indd � = , and Associates. Inc. Traffic CITY OF SUNNY ISI,IiS RI?ACII Engineering services Jason Webber, EIT (PA) Relevant Experience Falkenburg Road and Progress Boulevard Extension, Hillsborough County, FL — Served as a design engineer on the Kimley -Horn team on this project that involved the addition of an eastbound left turn lane from the Lee Roy Selmon Expressway Ramp to Falkenburg Road. Designed the stormwater management system for the runoff caused by the construction of the turn lane. ' Hayes Road Extension, Oldsmar, FL — Served as a design engineer for the Kimley -Horn team that is working on the 1,800 -foot urban collector road extension within the City of Oldsmar. Project involves the design, alignment, and permitting of the two -lane roadway that includes bicycle lanes and a multi -use trail /sidewalk, as well as extensions of water, sanitary sewer, and reclaimed water down the new right of way. The project also involves extensive utility coordination as a major section of the proposed roadway travels down the Progress Energy utility corridor. In addition, prepared the engineering report for a Southwest Florida Water Management District Environmental Resource Permit modification. Responsible for construction observation, certifications, and closeout of the project upon completion of construction. Barry University Master Plan, Miami Shores, FL — Serving as project analyst. As a subconsultant to another firm, Kimley -Horn is providing utility and traffic and transportation planning services at Barry University's Miami Shores campus. For utility services, the KHA team has provided a compilation of the utility information collected from Barry University staff via meeting and existing plans; conducted an overall assessment of condition of the respective utility based on the best information available; conducted an overall assessment of condition and life expectancy of the respective utility based on information received from the University; conducted an assessment of existing utilities (water, sanitary sewer and drainage) to determine demands and required improvements based on the 5 -year and 20 -year buildout of the campuses; assisted in phasing and scheduling of utility improvements; and reviewed and made recommendations of LEED° design characteristics for drainage services. Traffic and transportation planning services have included the review of vehicular, pedestrian, golf cart and bicycle circulation, and a review of parking requirements for the campus. Broward College Campus -Wide Master Planning, Broward County, FL — Served as project analyst. KHA provided utility planning services at Broward College Central, North, and downtown Fort Lauderdale campuses. The KHA team has provided a compilation of the utility information collected from Broward College staff via meetings and existing plans; conducted an overall assessment of conditions and life expectancy of the respective utilities; assessed the existing utilities (water, sanitary sewer, and drainage) to determine demands and required improvements based on the 5 -year and 10 -year buildout of the campuses; assisted in phasing and scheduling of utility improvements; and reviewed and made recommendations for LEED® TR3000164.1 1 - _SunnylslesBch_TES resumes.indd Project Engineer Special Qualifications • Seven years of experience in the surveying industry • Experienced with many aspects of civil design services, including site design, stormwater man - agement and drainage design, sewage collection design, water distribution systems, and agency permitting • Proficient with AutoCAD, Land Desktop, Softdesk, Solidworks, Sokkia total station, Topcon total station, and Microsoft Office Professional Credentials Bachelor of Science, Civil 1 Engineering, Pennsylvania State University Engineer -in- Training in Pennsylvania Professional Organizations American Society of Civil Engineers Florida Engineering Society PPIM"Kimley -Horn and Associates. Inc. Jason Webber, EIT (PA) Relevant Experience cont. enhancements. In addition, KHA provided an overall assessment of existing landscape materials, provided recommendations for enhancements, and assisted in providing estimated costs and budgets for required landscape improvements. We are also assisting in phasing and scheduling of landscape improvements. Florida Atlantic University (FAU) Florida Atlantic Boulevard Northern Four Lane Design and Permitting, Boca Raton Campus, Boca Raton, FL — Served as lead design engineer for roadway design (including vertical alignment, cross sections, pavement design, grading), drainage design, reclaimed water main, utility relocation, and erosion and sedimentation control. Assisted the project manager with coordination with FAU, Palm Beach State College, the Research and Development Park at FAU, and the City of Boca Raton. Led design team coordination with two subconsultants for three disciplines. Responsible for the SFWMD calculations for multiple basins and two analysis conditions. Coordinated with SFWMD to obtain the environmental resource permits with no comments. Florida Atlantic University (FAU) Continuing Minor Civil Engineering (Multiple Projects), FL — Kimley -Horn is providing a variety of services for FAU at its multiple Florida campuses. Projects performed in conjunction with this contract include serving as project analyst on the FAU Boca Raton Campus Lee Street Sidewalk project in Boca Raton, The project involved design and construction of 1,800 linear feet of 8- foot -wide sidewalk from the Engineering Building to the Recreation Center. Project included filling of existing adjacent swales and modification to existing SFWMD permits. Also served as project analyst on the FAU Harbor Branch Campus Entry Road and Guardhouse Reconstruction project in Fort Pierce. KHA provided the design and permitting of the pavement reconstruction of the entry road from US 1 to the Barrows Building at the Harbor Branch Campus. The design included reconstruction of the roadway surrounding the guardhouse. Permitting for this project included SFWMD and the Florida East Coast Railway. Also involved with the improvements to NW 6th Avenue from NW 28th Street to NW 32nd Street on the FAU Boca Raton Campus. Florida Atlantic University (FAU) Harbor Branch Entry Road Modifications, Fort Pierce, FL — Design analyst responsible for the civil design of the entry road modifications at the guard house entry to the Harbor Branch campus. Responsible for layout, grading design, utility connections, and coordination with the Florida East Coast Railway. Aided the project manager in utility relocation coordination. Florida Atlantic University (FAU) Harbor Branch Oceanographic Institute (HBOI) Link Building Renovation, Fort Pierce, FL — Design analyst responsible for the civil design of the Link Building renovation as a subconsultant to Song and Associates, Inc. Responsible for layout of sidewalks, grading design, and coordination with the prime consultant. Florida Atlantic University (FAU) Harbor Branch Campus Barrows Building, Fort Pierce, FL — Design analyst responsible for the civil design of the truck turnaround at the Barrows Building. Responsible for layout, grading design, and aided with coordination with the contractor through construction. Florida Atlantic University (FAU) Harbor Branch Oceanographic Institute (HBOI) Research Laboratory II, Fort Pierce, FL — Design analyst for the Kimley -Horn civil team that, as a subconsultant to another firm, provided site engineering for this building. Responsible for site layout, drainage design, utility relocation and design, and grading design. Also aided project manager with permitting through the South Florida Water Management District. Florida Atlantic University (FAU) Harbor Branch Campus Phase I Force Main, Fort Pierce, FL — Design analyst responsible for the civil design of the Phase I force main connecting the Harbor Branch campus to the existing force main at US 1. Responsible for layout, force main design, and roadway rehabilitation associated with the connection between the two existing systems. Florida Atlantic University (FAU) Harbor Branch Campus Phase II Force Main, Fort Pierce, FL — Design analyst responsible for the civil design of the Phase II force main connecting the Johnson House and proposed Lab II areas to the interconnect. Responsible for layout, gravity system design from Johnson House to the proposed Lift Station 7 at the Facilities Building, force main design from the proposed Lift Station 7 to the interconnect, and roadway rehabilitation associated with the connection between the two existing systems. CM" Kimley -Horn TR3000164 .11- 0_Sunny1s1esBch_TES resumesAndd , and Associates. Inc. Traffic �-1TY OF SUNNY ISLES BEACH t En&eemg Services Chris Falce, E.I., LEED° AP Relevant Experience ' Lincoln Road Closure, Miami Beach, FL — Served as project manager during construction phase. This project is a joint- venture between the City of Miami Beach and UTA Management, LLC. The 1000 -1100 block of Lincoln Road has been closed to vehicular traffic to allow for the extension of the Lincoln Road Pedestrian Mall. The mall was extended west, from Lenox Avenue to Alton Road, and includes a new pedestrian plaza. The design also includes four water gardens, and streetscape and infrastructure improvements. Kimley -Horn provided due diligence, civil engineering, landscape architecture, permitting, traffic signal modifications, and lighting and electrical design services for this project. 1111 Lincoln Road Parking Garage, Miami Beach, FL — Served as project manager during construction phase. This mixed -use project involved renovations and improvements to the existing building, which included retail space, six levels of parking, residential rooftop units, an open -air restaurant on the roof, as well as the addition of a new building. The new building includes a ground floor bank, private banking quarters, and four residential units. Kimley- Horn provided civil and traffic engineering services including due diligence, contract documents, permitting, and construction phase assistance. New World Symphony Parking Garage, Miami Beach, FL — Civil engineering analyst on the Kimley -Horn team that provided civil engineering design, traffic and signal engineering services, roadway engineering, and associated permitting for this new state -of- the -art facility. The project also included the development of the 600 -car Pennsylvania parking structure, for which Kimley -Horn provided preliminary civil engineering consulting services. This structure replaced and expanded existing on -site parking for the New World Symphony Campus. In addition to parking, this 38,000- square -foot, multistory structure will house ground level retail facilities. Kimley- Horn's services for the parking structure include due diligence, civil engineering design, agency /utility coordination, and permitting. Florida International University (FIU) Science Classroom Complex (SCC), Miami -Dade County, FL — Provided assistance with LEED® /sustainability issues. As a subconsultant to another firm, Kimley -Horn is providing civil engineering services related to the Science Classroom Complex (SCC), an ±80,000- square -foot, $43.5- million, laboratory and classroom facility located within FIU's Modesto Maidique Campus. The SCC is part of the Academic Health Sciences Center Master Plan that Kimley -Horn also helped develop with Perkins +Will. The complex will house classrooms, research laboratories, a vivarium, office /study spaces, an area for receiving scientific supplies and hazardous materials, storage spaces, service yard with loading dock and other support spaces. Upon completion, FIU will be seeking LEED° Silver certification for this project. TF3000164 .11- o_Sunnylslesfth_TES resumes.indd Project Analyst Special Qualifications • Six years of experience in South Florida land development • Significant experience with regulatory agencies and permit - ting processes in Miami -Dade County • Experienced with LEED® projects and implementation of sustain - able design elements Professional Credentials Bachelor of Science, Civil Engineering, University of Miami Engineering Intern in Florida LEED® Accredited Professional Professional Organizations United States Green Building Council American Society of Civil Engineers C=FJ Kimley -Horn m and Associates. Inc. Chris Falce, E.I., LEED° AP Relevant Experience cont. Miami Dade College Wolfson Campus Student Support Center, Miami, FL — Provided assistance with LEED® /sustainability issues. As a subconsultant to another firm, Kimley -Horn is providing civil engineering and transportation /traffic services related to the Student Support Center, a 6 -story, ±78,000- square -foot facility within Miami Dade College's Wolfson Campus. The project includes dining and food court areas, classrooms, a film archive center, student union, and fitness /wellness center. The MDC Wolfson Campus is unique in that it is located within a highly dense urban area in the heart of Downtown Miami. The project site is a 0.52 -acre property bounded by public roads, an existing restaurant building, and Miami -Dade Transit's Metromover. Since the building essentially takes up most of the property, some of the challenges included the need to be space- efficient with utilities and drainage, as well as close coordination with other team members to avoid conflicts and properly accommodate all project features within such limited space. Another challenge was pedestrian safety in crossing NE 2nd Avenue, a very busy downtown arterial. This was achieved by providing landscaping and street furniture along the edge of the road to channel pedestrians to specific crossing points at intersection crosswalks. KHA's services include design and development of construction drawings, sustainability, permitting, coordination with MDC's selected "CM at Risk," and construction phase services. West Sunset Square, Kendall, FL — Civil engineering analyst. Kimley -Horn provided a variety of consulting services for this 83,000- square -foot neighborhood center including site planning, civil engineering, roadway design, traffic signal design, permitting, and construction phase services. This project required significant coordination with multiple county agencies. Perhaps the most challenging aspect of the project was its location within the Bird Drive Everglades Wetland Basin (BDEWB). Due to a lack of sufficient surface water storage within the BDEWB, there were restrictions on the development of the site. Through our local experience and relationships with the Miami -Dade Department of Environmental Resources Management, Kimley -Horn was able to implement an innovative solution to meet the development criteria thereby allowing our client to fully develop the site. TD Bank (formerly Commerce Bank), Miami -Dade, Broward, and Palm Beach Counties, FL — Analyst and LEED° advisor for the Kimley -Horn team that has provided a range of site civil services, environmental design, landscape design, transportation planning, and traffic engineering for this retail bank program in Florida. The firm has investigated more than 300 South Florida locations, and designed and permitted more than 60 sites. TD Bank has made sustainable design a priority and seeks LEED® certification for many of their new branches. EM" Kimley -Horn TR3000164. 11- o_SunnylslesBch_TESresumes.indd and Associates. Inc. Broward College Campus -Wide Master Planning, Broward County, FL — Served as project analyst. KHA provided utility planning services at Broward College Central, North, and downtown Fort Lauderdale campuses. The KHA team has provided a compilation of the utility information collected from Broward College staff via meetings and existing plans; conducted an overall assessment of conditions and life expectancy of the respective utilities; assessed the existing utilities (water, sanitary sewer, and drainage) to determine demands and required improvements based on the 5 -year and 10 -year buildout of the campuses; assisted in phasing and scheduling of utility improvements; and reviewed and made recommendations for LEED° enhancements. In addition, Kimley -Horn provided an overall assessment of existing landscape materials, provided recommendations for enhancements, and assisted in providing estimated costs and budgets for required landscape improvements. We are also assisting in phasing and scheduling of landscape improvements. Palm Beach State College South Campus Parking, Lake Worth, FL — Serving as project analyst and assisting with plans revisions. Palm Beach State College MP /LW Campus, Palm Beach Gardens, FL — Serving as project analyst and assisting with completion of final plans. Florida Atlantic University (FAU) Harbor Branch Oceanographic Institute (HBOI) Student Apartments, Fort Pierce, FL — Served as project analyst and assisted with final plan revisions. PPIM" Kimley -Horn TR3000164 .11- 0_Sunnylsles9ch_TES resumes.1ndd `� and Associates. Inc. Traffic CITY OF SLINNY ISLFS BFAC1I Englneemg services John Hillman, E.I. Project Analyst Relevant Experience US 1 (Federal Highway) Interim and Final Enhancements, Delray Beach, Special Qualifications 1 FL — Serving as project analyst. This multi - phased project included a study, • Serving as a project analyst conceptual design, temporary implementation of the design for a trial period, • Software experience includes and final design of the permanent improvements. The City and its Community AutoCAD (versions 2005 -2011) Redevelopment Agency (CRA) adopted the Downtown Delray Beach Master and MATLAB Plan, and one of its key elements is a reconfiguration of the two one -way Professional Credentials segments of US 1 from three lanes to two. Kimley -Horn evaluated potential Bachelor of Science, Civil changes to the lane configuration along southbound and northbound Engineering, University of Florida segments of US 1. We developed alternatives, forecasted future traffic volumes for review with the City and the CRA, and led several public involvement : Professional Organizations workshops. Temporary improvements were installed to study the real -world American Society of Civil ;Engineering effects of fewer and narrower lanes. In 2010, the CRA asked KHA to move forward with designs for permanent improvements. Professional services will be completed in 2011, with anticipated construction commencement in 2012. City residents and visitors will soon enjoy the benefits of on- street, buffered parking; slower speeds and a safer, more pedestrian - friendly environment; rq j landscaping beautification and decorative, environmentally - sensitive street lighting; bicycle lanes; and a new sense of continuity with the Downtown area. Broward College Campus -Wide Master Planning, Broward County, FL — Served as project analyst. KHA provided utility planning services at Broward College Central, North, and downtown Fort Lauderdale campuses. The KHA team has provided a compilation of the utility information collected from Broward College staff via meetings and existing plans; conducted an overall assessment of conditions and life expectancy of the respective utilities; assessed the existing utilities (water, sanitary sewer, and drainage) to determine demands and required improvements based on the 5 -year and 10 -year buildout of the campuses; assisted in phasing and scheduling of utility improvements; and reviewed and made recommendations for LEED° enhancements. In addition, Kimley -Horn provided an overall assessment of existing landscape materials, provided recommendations for enhancements, and assisted in providing estimated costs and budgets for required landscape improvements. We are also assisting in phasing and scheduling of landscape improvements. Palm Beach State College South Campus Parking, Lake Worth, FL — Serving as project analyst and assisting with plans revisions. Palm Beach State College MP /LW Campus, Palm Beach Gardens, FL — Serving as project analyst and assisting with completion of final plans. Florida Atlantic University (FAU) Harbor Branch Oceanographic Institute (HBOI) Student Apartments, Fort Pierce, FL — Served as project analyst and assisted with final plan revisions. PPIM" Kimley -Horn TR3000164 .11- 0_Sunnylsles9ch_TES resumes.1ndd `� and Associates. Inc. John Hillman, E.I. Relevant Experience cont. Florida Atlantic University (FAU) Harbor Branch Entry Road, Fort Pierce, FL — Serving as project analyst; working on final design /plans. Florida Atlantic University FAU Boulevard, Boca Raton, FL — Project analyst for the Kimley -Horn team preparing roadway plans. Parkland Golf and Country Club (Toll Brothers Development), Parkland, FL — Serving as project analyst on the Kimley -Horn team providing civil engineering services for this residential development in Broward County. Tasks include preparation of due diligence report, grading and utility design, permitting, and final plans. Jupiter Medical Center, Jupiter, FL — Serving as project analyst and assisting with due diligence, engineering plans, and permitting. BJ's Wholesale Club, Various Locations, USA — Serving as project analyst and assisting with permitting and design for stores in Landover, MD, Fayetteville, NC, and Ithaca, NY. Eagle Ridge Mall Outparcel, Lake Wales, FL — Serving as project analyst assisting with conceptual site plan and permitting. / =/� Kimley -Horn TR3000164.11 -0_ Sunnylslesfth_TES resumes.indd `� , and Associates. Inc. DAVID P. LINDLEY, P.L.S. Caulfield & Wheeler, Inc. Vice President / Director of Surveying Surveyors & Mappers • High Definition Laser Scanning Mr. Lindley joined Caulfield & Wheeler, Inc. in 1985 and has been providing Land Surveying Services on projects throughout southeast Florida since that time. Mr. Lindley is the Director of the Land Surveying Department and supervises the Computer Automated Drafting Department of Caulfield & Wheeler, Inc. He is consistently researching publications and technical groups to insure that Caulfield & Wheeler's survey equipment, computer hardware systems, and software is the best available technology. He has established an excellent record for successfully completing both engineering and land surveying projects for numerous public entities as well as private developers and construction contractors. Mr. Lindley has 27 years of expertise in many surveying disciplines that include Geodetic Control Surveys, Route and Location Surveys for surface and subsurface mapping of existing utilities for design plan base maps, sketch and legal descriptions for easements and parcel acquisition, Boundary Surveys, Accident Surveys, Wetland Mapping, Stormwater Mapping, Topographic Surveys, Tree Surveys and Platting. Mr. Lindley has extensive Mapping & Computer Automated Drafting experience which allows him to efficiently and accurately complete projects to the high technical standards demanded by our firm. PROFESSIONAL & COMMUNITY INVOLVEMENT: Mr. Lindley is active in several state and local societies and programs representing the Land Surveying profession: Florida Surveying & Mapping Society (FSMS): • Florida District 6 (Palm Beach County) — Member • Florida Surveying Technician's Education Training Program Advisory Board (FL Training Services) 2005 -2008 • Broward County Chapter - Member Town of Jupiter: As a resident of the Town of Jupiter, Mr. Lindley has served as a Board Member for the Youth Competitive Volleyball Program (2006- Present) Additional Memberships: • Greater Deerfield Beach Chamber of Commerce • American Congress on Surveying and Mapping • National Society of Professional Surveyors Experience Highlights More than 27 years of surveying and mapping experience Expertise in preparation of survey data for use in land title transfers, platting, design surveys, right -of- way, municipal and environmental mapping Education Associate of Science in Land Surveying Palm Beach Community College, 1990 United States Army Surveyor, 1982 -1985 Numerous continuing education seminars in Surveying — 1985 present Professional Registration Professional Surveyor & Mapper #5005 — State of Florida, 1991 Professional Land Surveyor #4795 —State of North Carolina, 2009 Professional Affiliations Florida Surveying & Mapping Society (FSMS) Palm Beach County Chapter of FSMS Broward County Chapter of FSMS American Congress on Surveying & Mapping National Society of Professional Surveyors Page 2 David P. Lindley, P.L.S. PROJECT RELATED EXPERIENCE: Davis Landing Phase 1 and 2, Lake Worth, Florida Conducted a Boundary Survey, Topographic and Tree Survey of the subject property. Survey included existing asphalt, stripping, sidewalks, building walls, dumpster, site light poles and tree locations. Preparation of preliminary plat and plat processing. Easement preparation for various franchise and public utilities. Consultant additionally, was a Land Development Consultant, prepared a plat of the property and is currently providing construction layout services and as- builts for the property. Lake Okeechobee Bathymetry Resurvey and Data Integration; Transitional Area Data Acquisition Principal -in- Charge Third Order Class -I Hydrographic /Topographic Survey in order to acquire topographic survey data in Lake Okeechobee's transitional (perimeter) area of transects for 45 miles of shoreline were completed for the purpose of establishing a data connection between Airborne LiDAR Survey and Bathymetric Survey performed by survey vessels. This data was compiled in ESRI's ArcGIS and provided to the South Florida Water Management District's (SFWMD) GIS database. City of Delray Beach Plat Re view Consulting Contract Caulfield & Wheeler, Inc. was selected by the City of Delray Beach as one of their selected survey and engineering firms to provide professional services on a continuing contract on an as needed basis. Services provided to the City of Delray Beach include plat review services for the purpose of plat approval by the City Commission. Approximately twenty -five (25) plats were reviewed and approved by Caulfield & Wheeler, Inc. US 441 — Village of Wellington, Florida Principal -in- Charge responsible for the Right -of -Way Mapping, surface and subsurface data acquisition and design survey for 1.5 miles of US 441 (State Road No. 7) for the purpose of design and construction of improvements relating to the Isla Verde project. Lake Okeechobee Bathymetry Resurvey and Data Integration; Transitional Area Data Acquisition Principal -in- Charge Third Order Class -I Hydrographic /Topographic Survey in order to acquire topographic survey data in Lake Okeechobee's transitional (perimeter) area of transects for 45 miles of shoreline were completed for the purpose of establishing a data connection between Airborne LiDAR Survey and Bathymetric Survey performed by survey vessels. This data was compiled in ESRI's ArcGIS and provided to the South Florida Water Management District's (SFWMD) GIS database. Atlantic Avenue and AlA, Delray Beach, Florida Prepared a Topographic Survey of the subject property. Survey included existing asphalt, striping, sidewalks, building walls, dumpster, site light poles, tree locations, and Costal Construction Control Line Location. l STEPHEN R. ALEXANDRICH Caulfield & Wheeler, Inc. Survey Coordinator /CADD Technician Surveyors & Mappers • High Definition Laser Scanning Mr. Alexandrich has been surveying in the South Florida area since 1981 and has supervised numer- ous route surveys, boundary, construction layout, topographic, hydrographic, roadway and highway layout (including, but not limited to, super eleva- tions, spirals and bridges), sectional surveys and section breakdown, special purpose location sur- veys, ALTA /AGSM Land Title Surveys, control, and Asbuilt surveys. Project responsibilities also include the recovery of existing monumentation, placement of aerial targets, location of existing improvements, and fifteen years of super- vision of survey crews. PROJECT RELATED EXPERIENCE: I -95 corridor from Spanish River Boulevard to Linton Boule- vard — Palm Beach County, Florida Control and construction surveying of the over 4 mile I -95 corri- dor from Spanish River Boulevard to Linton Boulevard, including the layout of super elevations, spirals, expansion of 6 existing bridges and 1 new bridge, with calculations on the deflection of all bridge spans. Florida Turnpike — Florida Control and construction surveying of the 1.8 mile Florida Turn- pike corridor from the Dolphin Expressway (SR -836) to Tamiami Trail (SR -91), including the layout of all ramps and the expansion of 1 existing bridge. } Federal Highway- Boca Raton, Florida Construction layout and Asbuilt surveying of the 2.4 mile Federal Highway (S.R. -5) Reconstruction project Lincoln Road Mall - Miami Beach, Florida Construction layout and Asbuilt surveying of the 1.0 mile Lincoln Road Mall, reconstruction project and adjacent roadways. Collins Avenue - Miami Beach, Florida Construction layout and Asbuilt surveying of the North Beach Improvement project in Miami Beach, Florida. Including approxi- mately 1.4 miles of reconstruction to Collins Avenue, and 1.1 miles of 7 1St Street (S.R. -934) Page 2 Jeffrey R. Wagner, P.L.S. PROJECT RELATED EXPERIENCE: SW 6th Street Water Main Improvements — Delray Beach, Florida Conducted a Specific Purpose (1,100 feet) Survey of the subject property. Survey included existing asphalt, striping, sidewalks, building walls, light poles and tree locations. West Boynton Beach Library Renovation, Boynton Beach, Florida Conducted a Boundary Survey, Topographic and Tree survey of the subject property. Survey included existing asphalt, striping, sidewalks, building walls, dumpster, site light poles and tree locations for the design of rework of the existing sidewalk and library. Indian River County Beach Restoration, Indian River, Florida Control surveying for 3 miles of beach restoration for the dredging contractor. Services included before dredge and after dredge cross sections from the erosion control to 400 feet east of the existing mean high water line at 100 foot baseline intervals. Fort Lauderdale International Airport, Broward County, Florida 1 FAA Project No. 3 -T2- 0025- 063 -2010 I'LL Consultant No. 20051018- 0- Av -0 -0IA Provided surveying services for newly constructed runway and taxiway to include stakeout and as- builts of pavement and utilities. SE 1St Avenue /SW 6th Avenue /SW 3rd Avenue, Delray Beach, Florida Platted rights -of -way, lot numbers, block numbers, house numbers (if available) and dedicated easements. All improvements, physical objects, driveways and significant landscape within the right -of -way. All underground utilities. Established stationing for all topographical surveys from south to north and east to west where applicable. Elevations every 100 feet, at a minimum. Topography of the complete intersection, 50' beyond radius returns, at the terminal end of each street. Drainage Study for 19th Avenue Improvements - Deerfield Beach, Florida Surveying for the acquisition of data relating to surface and subsurface locations for the preparation of a Drainage Study for 19th Avenue Improvements, December 2004. Jim Moran Boulevard - Deerfield Beach, Florida Surveying for the acquisition of data relating to surface and subsurface locations for the preparation of a construction Plans for Jim Moran Boulevard, March 2005. N.E. 4th Court, May 2006, Deerfield Beach, Florida Surveying for the acquisition of data relatin to surface and subsurface locations for the preparation of construction plans for N.E. 4t Court, May 2006. Poinsettia Gardens - Deerfield Beach, Florida Surveying for the acquisition of data relating to surface locations for the preparation of Special Purpose Survey and a Roadway Lease Agreement for Poinsettia Gardens, August 2008. Responsive Project Management Kimley -Horn recognizes that a cohesive project management technique is necessary to successfully provide traffic engineering services to the City of Kimley -Horn recognizes Sunny Isles Beach. Our standard management practices are outlined in a formal that a cohesive manual published by the firm entitled, Project Manager's Manual. This document project management clearly establishes the firm's policy, which requires the project manager to technique is necessary prepare a detailed work plan and management plan for each major project. This to successfully provide includes a plan for controlling and directing all elements of the project. traffic engineering � Our entire approach to project management is characterized by the following services to the City of philosophies and policies, which are ingrained in the Kimley -Horn culture: f Sunny Isles Beach ■ We will not only control and manage the project schedule, we will anticipate problems, creatively develop solutions, and implement a set of actions before problems arise. ■ We will be responsive to your concerns and request. We understand that responsiveness is a priority for the City. ■ We will follow up on action items to ensure that planned actions are executed by a single responsible person. There will be no misunderstanding as to who was or is responsible. ■ Our project management plan will promote efficiency, clarify Our project manager, communication protocols, provide direction, avoid misunderstandings, and Adam Kerr, P.E. will govern routine action. be in command and ■ We will execute random inquiries into schedule adherence, work control of the project at performance, quality performance, and resource allocations to determine all times. compliance with planned project performance. We will identify anomalies and take instant corrective actions as needed. ■ Our project manager, Adam Kerr, P.E. will be in command and control of the project at all times. He will have the authority to allocate resources and correct problems. ■ We will view the project from your perspective, examine issues in a strategic context, and provide you with tactical solutions. Kimley- Horn's management approach is team - oriented, no- nonsense, results - oriented, and saturated with top quality people who routinely produce superior results. Project Organization In short, Kimley- Horn's management approach is team - oriented, no- nonsense, results- oriented, and saturated with top quality people who routinely produce superior results. Kimley -Horn has the depth of resources, local experience and diversity of expertise to provide the entire scope of services required for RFQ NO. 11- 11 -01. Effective project management is essential to the production of quality work and successful projects completed on schedule and within budget. The basic approach to any project begins with an effective project manager who understands the project requirements and is committed to developing a project team that contains the right staff for the right job and maximizes the expertise and experience of each professional. ` /=/� Kimley -Horn TR90001841q�OM$un I IesB�h 7 McEngS &.intld '` Page 4-1 ,and Associates, Inc. Traffic CITY OF SUNNY ISLES BEACH ' Engineemg Services 1 Kimley -Horn project manager Adam Kerr, P.E. will develop very detailed work plans that include specific task items for the duration of all projects with associated team members' responsibilities and corresponding time. The work plan defines who, what, when, where, and how for all project tasks with clearly defined channels of communication. This level of detail requires that the project manager and team members think the project through and develop a plan that they are responsible for implementing. Identify Key Issues During the planning and design process, it is important to identify and resolve key issues as early as possible. Issues addressed during the preliminary design phase often impact existing systems, levels of service, budget, and ease of operation and maintenance. Kimley- Horn's approach to design has always to emphasize creativity while minimizing construction costs and maximizing functionality. Design Phase Whatever the task, Kimley -Horn will begin with a comprehensive team effort to work with the City during the very critical preliminary design phase. It is vitally important that all major decisions are thoroughly examined and consensus is reached before subsequent designs and construction drawings are prepared. We will use our experience in planning, design, construction, and operational assistance on all elements of any project. Our same team of engineers is involved in every step of the design and construction phases from beginning to end. This allows staff to communicate their desires throughout the design process and eliminates surprises during construction, startup, and long -term operation and maintenance of the facility. Construction Documents and Specifications Preparation of the construction documents requires careful attention to detail and a thorough understanding of the issues identified in the initial phases. Each piece of equipment must be specified so the City knows what to expect during the construction phase. Materials, products, and equipment must be able to provide long -term, trouble -free service. On the other hand, over specification can lead to significant cost increases. The Kimley -Horn team has in -depth experience with the types of material selections that work best. Our design team has practical experience during construction and equipment startup. This experience allows us to design facilities that will be easy to construct, easy to operate, and easy to maintain — resulting in significantly reduced costs to the City. Our construction experience also has given us an insight into the importance of specification content. These documents must be complete and thorough —not vague or contradictory. Any dispute that occurs will be resolved by the contract documents, which must clearly support the City's position. Procurement Phase Kimley -Horn has been successful on past projects in utilizing multiple contracts and direct purchase of major equipment items. The City can realize cost savings by avoiding contractor markups on the direct purchase of major equipment items and by taking advantage of your sales tax exempt status, which general contractors must build into their costs. Kimley -Horn understands the importance of being responsive during the bid phase. Answering contractor questions and issuing clarifications or addenda in a timely manner during the bid phase can mean the difference between delivering a successful construction project on time and within budget or navigating through a project riddled with disputes. Our contractor evaluation procedures will also help the City in identifying the contractor who will best suit your needs. TR3000164 .11- 0_Sunny1s1esBch_Tr6 ficEngSermindd 4 Page 4 -2 PPIMFI Kimley -Horn 11111h.- = and Associates. Inc. Traffic CITY OF SUNNY ISLES BEACII Engineemg Services Construction Phase Unlike other firms that separate the construction phase team from the design team, our philosophy is to maintain i the continuity of the design staff during construction. Because these individuals are the most familiar with the design of your project, there is no learning curve during its construction. Kimley- Horn's professional staff has extensive experience in construction administration and will keep the contractor on task, on time, and within budget. Our experience will result in the delivery of a quality project that will make the City and Kimley -Horn proud. Project Field Representative Our on -site project field representative will observe contractor operations throughout the construction process. This is particularly important for components that will be buried or otherwise hidden from view at the conclusion of the project. Pipelines, foundations, pumps, conduit, and internal components must be inspected prior to installation and comprehensively photographed for future reference. All of these activities will be documented in daily reports and photographs prepared and cataloged by the field representative. Any deviations will be brought to the City's and contractor's attention as they are discovered so they can be resolved quickly. Ability to Work With Staff and Stakeholders to Build Consensus No matter the task, one of the most viable advantages that Kimley -Horn can offer the City of Sunny Isles Beach is the ability to put local resources into No matter the task, action at a moment's notice. We will work alongside City staff in an effort to one of the most viable augment your team, providing immediate assessment assistance to address ' advantages that Kimley- your issues and offer support to formulate recommendations and obtain practical solutions. Our combination of local attention, area knowledge, and Horn can offer the City national expertise will assist you in making informed and timely decisions on a of Sunny Isles Beach is daily basis. the ability to put local resources into action at a 1. We understand that our clients expect a high We understand level of responsiveness, communication, moments notice. that our clients and quality. Clear communication is a critical expect a high level step in the partnering required for a successful project. We endeavor to define the of responsiveness, project requirements, understand possible obstacles to success, identify potential communication, opportunities to achieve more within the same project, and create a project work plan that allows us to accomplish your goals efficiently. Paramount to the success of any l and duality. project is a continued partnering throughout the project to adapt as necessary to = unforeseen circumstances. We will include critical decision making points in our work plans so that the project team and the City can agree upon the best course of action to keep projects on track. We know there will always be unexpected challenges that are distinct to any given project, so it is critical to develop and follow an approach that can be controlled while building in mechanisms for managing the unexpected. Equally important is project communication with key stakeholders. KHA will prepare a project- specific program to identify opportunities for stakeholders to participate in a project's development. Approaches to encourage stakeholder participation include public meetings, a project website, open houses, newsletters, news releases, and weekly project status reports. We will proactively solicit stakeholder participation and respond to their input. At Kimley -Horn, we believe that broad participation is attainable through a plan that is proactive, impartial, understandable, visually informative, and thorough. - pp� _ _ , /l Kimley -Horn T13000164. 11ASunnylslesBch TrdHcEngServs.indd Page 4 -3 ` and Associates. Inc. Ability to Meet Desired Timelines and Deadlines Kimley -Horn is committed to providing the City of Sunny Isles Beach with the highest quality staff and service to meet your project schedule and budget requirements. Meeting your schedule for deliverables is not just a goal to us —it is a mandate. To assist our project managers in efficient administration of projects, Kimley -Horn maintains a detailed, integrated management information system (MIS). This system, designed primarily to focus on schedule adherence and cost control, has proven to be a valuable tool. Schedule control begins with the preparation of a detailed schedule that includes milestone completion dates for specific tasks and the overall project. We will develop for this project, as we do for every project we undertake, a work plan v Meeting your that allocates person -hour commitments by individual for each task. The MIS schedule for generates a Project Effort Report twice each month showing the effort that has a. been expended for each task. This internal control allows us to make, on a timely i deliverables is not basis, any adjustments that may be necessary to maintain your schedule and stay just a goal to us— within your budget. it is a mandate. Kimley -Horn also uses a proprietary program and workload forecasting technique called "cast - aheads" which is our primary means of tracking and evaluating our staffing needs and availability for a particular contract. Updated monthly by project managers, the cast -ahead system is used to define specific staffing needs for the next month and for the next six months. All project managers reserve staff or request specific personnel to work on their projects for a certain number of weeks of the month. The combined input from all project managers is compiled and distributed in the form of a report to all project managers and regional management for review and discussion at the monthly cast -ahead meeting. Work overloads and /or shortfalls for specific personnel, individual offices, and disciplines are tabulated and addressed at the meeting. Where possible, any imbalances are resolved through internal shifts of personnel between offices. The objective is to balance the workload in a manner that maximizes the utilization of production staff, while ensuring that all project requirements and client deadlines are met. This system ensures that the right people are working on your project when they need to be in order to complete the project within your schedule. TR3000164.11.O_Sun nylslesBch_Traff icEngServs. indd 4 Page 4 -4 PP-Horn 1111kh- = and Associates, Inc. Summa As your consultant, Kimley -Horn will provide you with: THE KIMLEY HORN ADVANTAGE Responsive Project ✓ In -depth experience and demonstrated capability to provide traffic engineering Management services ✓ Personnel who have completed projects for satisfied clients who are proud of their projects ✓ Staff who understand that they represent the City of Sunny Isles Beach's and must keep your best interests in mind at all times ✓ Project team with the experience and creativity to develop innovative, time- and cost - saving ideas to meet the City's needs Project Organization ✓ Understanding of project requirements ✓ Maximizing expertise /experience of personnel ✓ Identity key issues ✓ Ability to anticipate problems before they occur Effective Consensus Building ✓ Clear communication with all stakeholders ✓ Defining project requirements, anticipating possible obstacles, and identifying potential opportunities ✓ Create a work plan to accomplish goals efficiently ✓ Continued partnering throughout the process ✓ Building in mechanisms for managing the unexpected ✓ Broad participation is attainable through a plan that is proactive, impartial, understandable, visually informative, and thorough Ability to Meet Desired Timelines ✓ Understand the City's vision and develop a realistic schedule to make that vision and Deadlines a reality ✓ When required, accelerate work to meet a change in project schedule, allowing our team to be flexible and be able to react to all types of scheduling changes ✓ As illustrated by the schedule in Section 2, Kimley -Horn is confident in its ability to monitor project schedules in order to meet the City's time and budget constraints Kimley -Horn looks forward to working with the City of Sunny Isles Beaches on this traffic engineering services RFQ. z... _ . C_1 1 Kimley -Horn T�300016411- 0_ Sunnylslessch _Tr�fficEngSe'raindd Page 4 -5 � and Associates. Inc. Traffic CITY OF SUNNY ISLES BEACH En gineem g i Services Kimley -Horn is proud of the relationships we have developed with our clients, and much of our success over the last four decades is directly related to our efforts to perform high quality, timely services for all or our clients. The three public sector client references provided on the following pages are for projects performed within the past five years for projects similar to the City's RFQ No. 11- 11 -01. We invite you to contact our references; these individuals will tell you that we listened to their needs, met their schedules, accomplished their missions, and delivered results. PPP"' = Kimley -Horn TR3000164.11.0_SunnylslesBch_Tr fficEngServs.indd Page 5-1 and Associates. Inc. F EU FLORIDA. ATLANTIC UNIVERSITY November 29, 2011 Re: Kimley -Horn and Associates, Inc. Recommendation To Whom It May Concern: Facilities Planning Department Division of Facilities 777 Glades Road, Building CO -69 Room 107 Boca Raton, FL, 33431 tel: 561.297.3141 fax: 561.297.2260 Itttp.1114a Vp,fiui.edzr /fp We welcome this opportunity to recommend Jason Webber and the team at Kimley -Horn and Associates, Inc. on behalf of the Florida Atlantic University Facilities Planning and our project users. We have worked with Kimley -Horn, as one of our continuing services civil engineers, on several projects of varying scope and magnitude and I have personally worked with Jason and the KHA team on several of them. I worked with Jason on the roadway improvements at NW 61h Avenue on the Boca Raton Campus. This was a roadway widening project that involved careful construction adjacent to conservation lands with endangered burrowing owls and user - occupied buildings which needed to remain open and accessible throughout construction. Jason and his team worked hand -in -hand with myself, other FAU staff, and the contractor to ensure that the project was completed on schedule and to everyone's satisfaction. While the scope of Kimley- Horn's design for a new entry and parking area at the Louis and Anne Green Memory and Wellness Center differed from other larger scale work they've completed on the FAU campuses in Boca Raton and the Harbor Branch Oceanographic Institute in Fort Pierce, Jason and his team showed the same level of care and detail on this project and were in- there - with -us from the beginning. Thanks to this project the seniors at the facility have an ideal path of travel which was thoughtfully integrated into the existing building and enhances the Center's primary entry. Working with Kimley -Horn on this project and other road improvement projects in recent years is a reminder of their value and the confidence we have in their great work. Sicr y Lyn orster Project Manager (561) 297 -0821 BOCA RATON • FORT LAUDERDALL • DANIA BEACII It HARBOR BRANCH • JUPITER •PORTST. LUCITi Art Equal Ohl:ortuttihIlEqual Access tttstitittiat The City o f Boynton Beach June 10, 2009 DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beads, Florida 33425 -0310 TEL: 561-742-6260 FAX: 561 -742 -6259 www.boynton- beach.org To Whom It May Concern: i Kimley -Horn and Associates, Inc. assisted the City of Boynton Beach in creating a Transportation Concurrency Exception Area (TCEA) as part of our efforts to redevelop our Intracoastal Waterway area. The firm has been working closely with us as the City revitalizes and redevelops areas within our community. The City and our CRA have looked to Kimley -Horn to provide planning, 3 engineering, environmental, and landscape services. They have partnered with us and provided us with creative solutions. I am pleased with the professional services they have provided and would recommend them to any agency looking f to create a TCEA. r Sincerely, c` - Hanna Matras, Senior Planner Vivian L. Brooks City of Boynton Beach Assistant Director Boynton Beach CRA CITY OF City of Cape Coral YA �v O November 7, 2007 City of Fort Myers 2200 Second Street Fort Myers, Florida 33902 RE: Request for Qualifications for Transportation Planning and Traffic Engineering Consulting Services To whom it may concern: Kimley -Horn and Associates, Inc. quality and experience have been proven on several of our projects. Their company and its representatives have been conscientious and thorough on their work; specifically they have shown initiative on our newest project, Chiquita Boulevard. I would recommend use of their firm. Sincerely, 7er Steve Neff Transportation Manager City of Cape Coral 1015 Cultural Park Boulevard Cape Coral, Florida 33990 239- 242 -3219 Public Works Department • Administration • City of Cape Coral • P.O. Box 150027 • Cape Coral, Florida 33915 -0027 (239) 242 -3200 • Fax (239) 574 -0732 • http: / /www.capecoral.net Co- County Seat - Lee County, Florida Traffic CITY OF SUNNY ISLES BEACH -� En&eemg Services G. Office Locations For this contract, Kimley -Horn will serve the City of Sunny Isles Beach primarily from our West Palm Beach office located at: 1920 Wekiva Way, Suite 200 West Palm Beach, FL 33411 (561) 845 -0665 Point of contact: Adam Kerr, P.E., Project Manager, Associate Our surveying subconsultant, Caulfield & Wheeler, Inc., will serve the City from the following location: 7301A West Palmetto Park Road, Suite 100A Boca Raton, FL 33433 (561) 392 -1991 Point of contact: David Lindley, PLS, Director of Surveying TR300018411A Sunnylslesft -T afficEngSarnindd i Page 6-1 PPIMFIKimley -Horn and Associates. Inc. I Traffic CITY OF SUNNY ISLES BEACII g eem En � Services The contract forms listed below are provided on the following pages: • Bid Submittal Forms • Non - Collusion Affidavit • Public Entity Crimes • Equal Opportunity /Affirmative Action • Conflict of Interest • Dispute Disclosure • Anti - Kickback Affidavit �.. ��� Kimley -Horn TR3000164.11- 0_SunnylslesBch_Tr BicEngServsJndd Page 7 -1 and Associates, Inc. ^.. DELIVER TO. REQUEST FOR City of Sunny Isles Beach QUALIFICATIONS OPENING: 10 :00 A.M. City Clerk SECTION 6 12 -02 -11 18070 Collins Avenue BID SUBMITTAL FORMS Sunny Isles Beach, FL 33160 PLEASE QUOTE PRICES F.O.B. DESTINATION, LESS TAXES, DELIVERED IN CITY OF SUNNY ISLES BEACH, FLORIDA NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Bid price should be less all taxes. Tax Exemption Certificate furnished upon request. r Issued by: Purchasing Agent Date Issued: This Bid Submittal Consists of 11 -08 -11 Pages 20 through 23 Sealed bids are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. RFQ 11 -11 -01 TRAFFIC ENGINEERING SERVICES A Bid Deposit in the amount of 0% of the total amount of the bid shall accompany all bids A Performance Bond in the amount of 0% of the total amount of the bid will be required upon execution of the contract by the successful bidder and City of Sunny Isles Beach ProcurementAgen : Firm Name., Marcanthony Tulloch Kimley- Horn and Associates Inc. Commodity Codgfs); RETURN ONE ORIGINAL AND FOUR COPIES OF BID SUBMITTAL PAGES AND AFFIDA VITS FAILURE TO SIGN PAGE 23 OF SECTION 6 BID SUBMITTAL WILL RENDER YOUR BID NON- RESPONSIVE City of Sunny Isles Beach I Request for Qualifications No. 11 -11 -01 M SECTION 6 BID SUBMITTAL FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID Addendum #1, Dated November 14, 2011 Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: ❑ NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID FIRM NAME: AUTHORIZED SIGNATURE: DATE: 12/01/11 TITLE OF OFFICER: Principal- in- ChargeNice President City of Sunny Isles Beach I Request for Qualifications No. 11 -11 -01 BID SUBMITTAL FORM Bid Title: TRAFFIC ENGINEERING SERVICES The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of Sunny Isles Beach in the form included in the Contract Documents to perform and furnish all j Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. The Proposers accepts all of the terms and conditions of the Advertisement or Request for Qualifications and Instructions to Proposers, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within ten days after the date of the City's Notice of Award. ,j In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that: ■ The Proposer has familiarized himself /herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. ■ The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposers to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and /or Notice to Proceed. City of Sunny Isles Beach I Request for Qualifications No. 11 -11 -01 Firm Name: Kimley -Horn and Associates, Inc. Street Address: 1920 Wekiva Way, Suite 200, West Palm Beach, FL 33411 Mailing Address (if different): Telephone No. (561) 845 -0665 Fax No. (561) 863 -8175 Email Address: mike.spruce @kimley - horn.com FEIN No. 56- 0885615 * "By signing this document the bidder agrees to all Terms (Signature of authorized agent) Print Name: Mike Spruce, P.E Title: Principal -in- Charge /Vice President THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE ROUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON - RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY RINDS THE PROPOSER TO THE TERMS OF ITS OFFER. City of Sunny Isles Beach I Request for Qualifications No. 11 -11 -01 }�Nr.� rsrF I \ V, STATE OF FLORIDA COUNTY OF ) NON- COLLUSION AFFIDAVIT City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax. (305) 949 -3113 The undersigned being first duly sworn as provided by law, deposes, and says: This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of, Kimley -Horn and Associates, Inc. (Name of Corporation, Partnership, Individual, etc.) a corporation formed under the laws of North Carolina (Type of Business) (State) of which he is Principal - in- Charge /Vice President (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid. or that such person, firm or corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers: and all statements contained in the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 10.2, has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to any member or agent thereof. Principal -in- Charqe /Vice President AFFIANi'S NAME / AFFIANT'S TITLE Mike Spruce, P.E. TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this 1st day of December ,]�M<. 2011 . Personally Known or Produced Identification Type of identification (Affix seal here) E Notary Public State of Florida Marcia A Cornelison My Commiss on DD904606 Expires 0911 v2013 NOTARY PUBLIC (name qg��nted or typ d) f Ct � rC�o, . Ut r Yl e I l S Y� N, DECEMBER 28, 2010 1 of 7 no PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax. (305) 949 -3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub - Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to City of Sunny Isles Beach by (Nike Spruce, P.E. Principal- in- ChargeNice Presid (print individual's name and title] for Kimley -Horn and Associates, Inc. [print name of entity submitting sworn statement] whose business address is: 1920 Wekiva Way, Suite 200, West Palm Beach, FL 33411 and (if applicable) its Federal Employer Identification number (FEIN) is 56- 0885615. (if the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: ) 11.2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. 1 understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non -jury trial, or entry of a plea of guilty or nolo contendere. 11.4. 1 understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair DECEMBER 28, 2010 2 of 7 market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 11.5. 1 understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) _X_ Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM_ By: (Signature) Mike Spruce, P.E. (Printed Name) Principal- in- Charge/Vice President (Title) , Sworn to and subscribed before me this 1st day of December 2011, by Lk C r0:0Y a!1Q� Notary Public State of Florida wo Marcia A Cornelison Signature: Notary publi State of Florida o My Comr^!ss on DD90�1;5.' (`{`Q '�i y 9rl . a? Expires a9n Q01 3 Y Cif_ ��.r.. 4.�., X R Print or Type Commissioned Name Personally Known OR Produced Identification Type of Identification Produced 1011998 3 of 7 j `. EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949 -3113 EQUAL OPPORTUNITY /AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: Title: Principal -in- Charge /Vice President Firm: Kimley -Horn and Associates, Inc Address: 1920 Wekiva Way, Suite 200 West Palm Beach, FL 33411 DECEMBER 28, 2010 4 of 7 t � 7 CONFLICT OF INTEREST 'J City of Sunny Isles Beach 7' 18070 Collins Avenue t;w ° Sunny Isles Beach, FL 33160 o' Telephone: (305) 947 -0606 Fax: (305) 949 -3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTY OF ORANGE BEFORE ME, the undersigned authority, personally appeared Mike Spruce, P.E. who was duly sworn, deposes, and states: 18.1. 1 am the Principal -in- ChargeNice President with a local office in West Palm Beach, Florida and principal office in Raleigh, North Carolina. 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No. described as: Landscape Maintenance Services. The Afflant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 18.5 Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 18.71 certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 18.81 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.9 In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach. 1st day of December 2011. Mlke Spruce, P.E., Principal -in- ChargeNice President AFFIANT Print or Type Name and Title \S worn to and subscribed before me this 1st day of December 2011. Personally Known OR �0 Produced Identification ; Type of Identificatiop (B��c,� UT C,kyk / � ' CC y "C A L S CNN NOTARY PUBLIC STATE OF FLORIDA ENotary Public State of Florida Marcia A Cornelison c My commission DD904606 Expires 0 911 112013 DECEMBER 28, 2010 5 of 7 t yJ�hY �S(f J °. DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue 9 Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949.3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No ". If you answer "Yes ", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO —X 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO X 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES _X_ (see attached list) * NO _ If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. Kimley -Horn and Associates, Inc. Authorized Signature December 1, 2011 Date Mike Spruce, P.E., Principal -in- Charge /Vice President Print or Type Name and Title * As required in RFQ No. 11- 11 -01, Kimley -Horn and Associates, Inc. has reviewed the proposed contract terms and conditions language as written and objects to the language in total since it applies to Contractor Services and not Professional Services as are being requested in the RFQ. In a discussion with the City Attorney, he indicated it would be appropriate to object to this language in total and that, if selected, Kimley -Horn would be provided the opportunity to provide the Professional Services using appropriate contract terms. Therefore, if selected, we reserve the right to negotiate for a professional services contract similar in wording to the contracts that have been mutually acceptable to all parties in the past. DECEMBER 28. 2010 6 of 7 Legal Actions Within the Past Five Years Below is a summary of litigation filed against Kimley -Horn and Associates, Inc. in the past five years related to the services that Kimley -Horn provides in the regular course of business. Kimley -Horn has 57 offices across the United States and more than 1,500 employees. Kimley- Horn completes several thousand projects every year. Thus, exposure to litigation is large; however, our actual record of litigation is light. There are only twelve pending lawsuits nationwide. In our opinion, these lawsuits are without merit, and we are aggressively defending them. The following information is considered confidential and is not to be disclosed to any other party without Kimley -Horn's written permission. We can provide further information to authorized officials only on a "need to know" basis. Suits filed against Kimley -Horn (and multi - parties) and their dispositions are as follows: Pending Litigation: Florida Maria Carias, as Guardian of the Person and Property of Carlos Carias, et al v. All Catastrophe Construction Team, Inc.: Case No. 50 2011 CA 008462 XXXX MB AD; filed 2011; personal injury claim. Castle Brook Developers, Inc. and Cogdill Builders, Inc. v. GGI, Ltd., et al: Case No. 2008 - CA- 000239; filed 2008; alleged economic loss. Glenda Fuller, as Personal Representative of the Estate of Dana King, Deceased, et al v. Bluegreen Resorts Management, Inc. and Kimley -Horn and Associates, Inc.: Case No. 1 1- CA- 10865 -0; filed 2011; traffic accident, wrongful death claim. Walter Gaitan as Personal Representative of the Estate of Carlos Jose Gaitan, Deceased, et al v. Gibraltar Cable Barrier Systems, L.P., et al: Case No. 09 -29561 CA21; filed 2010; traffic accident, wrongful death claim. Efrain Gamarra, as Personal Representative of the Estate of Maria Gamarra Deceased v. Gibraltar Cable Barrier Systems, L.P., et al: Case No. 50- 2008 -CA- 027405; filed 2008; traffic accident, wrongful death claim. Richard and Elisa Lacasse v. Wal -Mart Stores, Inc., et al: Case No. 110071 OCA; filed 2011, bicycle accident, personal injury claim. Laurie J. Mullen as Personal Representative De Son Tort, of the Estate of Kimberly Jean Haro Deceased v. Aleiando M. Martian Mesa, Pateo Transport, Inc.. et al: Case No. 06- 001608; filed 2006; traffic accident, wrongful death claim. Theresa Murphy, individually, Thomas Murphy her husband and Theresa Murphy and Thomas Murphy, as parents and natural guardians of Caitlin Murphy, a minor v. Kimley- Horn and Associates, Inc.: Case No. 08542CA; Filed 2008; traffic accident, personal injuries claimed. Georgia Jay Diamond v. Kimley -Horn and Associates, Inc.: Case No. SC l OCV 1541: tiled 2010; traffic accident, personal injuries claimed. Texas Brinnith Grays v. AUI Contractors, LLC, et al: Case No. 34225504311; filed 2011; traffic accident, personal injury claim. Dorrell Square Homeowner's Association v. DR Horton, Inc., et a] v. Allard Enterprises Inc., et al: Case No. A527688; filed 2011; alleged economic loss. Susan Foster v. Ed A. Wilson, et al: Case No. CVI0 -151 l; filed 2010; personal injury claim. Concluded Litigation: Arizona Settlin' Inn, LLC v. Kimlev -Horn and Associates, Inc.; Case No. CV2007- 015460; filed 2007; alleged economic loss, settled; closed 2008. California Lauth Group, Inc. v. Foundation Engineering Science, Inc. et al: Case No. FCS031826; filed 2008; property damage; settled; closed 2010. Scott Regberg v. City of Santa Monica, et al: Case No. SC091663; filed 2006; bicycle accident with personal injuries claimed; settled, closed 2007. Florida Jayme Barrett v. Keith & Schnars, P.A., et al: Case No. 16- 2006 -CA- 001960; filed 2006; traffic accident with personal injuries claimed; settled; closed 2008. Commercial Industrial Corte. v. Jonathan D. Thigpen, PE and Kimlev -Horn and Associates, Inc.: Case No. 06- 553 -CA -B; filed 2006; alleged economic loss; settled; closed 2007. Dorothea A. Gerber and Martin A. Gerber v. Heather E. Hill, et al: Case No. 50 2009 CA 008649 XXXX MB AB; filed 2009; traffic accident, personal injuries claimed; dismissed 2010. Yolanda Ortiz and Carlos Ortiz, etc. v. Wal -Mart Stores East, LP, et al: Case No. 07- 009152; filed 2008, personal injuries claimed; mediated settlement; closed 2009. Thomas Telesca v. Weekley Asphalt Paving, Inc.. et al; Case No. 50- 2005 -CA- 006061 XXXX NB AO; filed 2006, traffic accident with personal injuries claimed, settled; closed 2007. Louisiana Perkins Rowe Associates LLC v. Kimley -Horn and Associates. Inc.: Case No. C543714, Section 23; filed 2006, alleged economic loss; settled; closed 2010. N. Carolina James V. Kennedy v. Kimley -Horn and Associates, Inc.: Case No. 08 CVS06668; filed 2008, property damage; settled; closed 2009. Tennessee Rickey E. Moore, et. al. v. Memphis Area Transit Authority, et al: Case No. CT- 004519 -05; filed 2007; traffic accident, personal injuries claimed; settled; closed 2010. Texas Creekside at Stonebriar Homeowners Association Inc. v. Conine Res idential-Creekside, Ltd. et al: Case No. 401- 01084- 2008; filed 2009, property damage; dismissed; closed 2010. Lariat Construction Company v. Kohl's Department Stores, Inc., et al: Case No. 2008-03 - 001678-A; filed 2008; alleged economic loss, dismissed; closed 2008. J. Scott and Susan P. Simmons v. Kimley -Horn and Associates, Inc. (Third Party Defendant): Case No. 141 - 228829 -08; filed 2009, property damage; settled 2010. Virginia Bagbv Caldwell and Associates P.C. v. Kimley -Horn and Associates, Inc. (Third Party Defendant): Case No. CL 05- 72 -02; filed 2010; alleged economic loss; settled; closed 2010. In addition, there are occasions on which "claims" are made against Kimley -Horn. At the present time, there are no monetarily significant or meritorious claims outstanding and no judgments have been entered against Kimley -Horn. Settlements related to claims are bound by confidentiality Agreements so we cannot release that information. From time to time, Kimley -Horn will file a lawsuit against a client for unpaid fees. We do not track these cases. to, STATE OF FLORIDA ) COUNTY OF ORANGE ) ANTI - KICKBACK City of Sunny Isles Beach 1 B070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone- (305) 947 -0606 Fax: (305) 949 -3113 ANTI - KICKBACK AFFIDAVIT I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. By' Mike Spruce /P.E. Title: Principal -in- Charge /Vice President The foregoing instrument was acknowledged before me this 1st day of December 2011, by Mike Spruce, P.E. [name of person], as Principal -in- Charge /Vice President [type of authority], for Kimley -Horn and Associates, Inc. [name of party on behalf of whom instrument was executed]. AFFIX NOTARY STAMP HERE: =oogY'oa<1 Notary Puolic State of Flcca.2 Notary Public — State of Florida Marcia A Lornelison Yfl'o_ia My COR1rn15Sion DD9onuC6 £xp�res 0911 112013 I Print or Type Commissioned Name Personally Known OR Produced Identification Type of Identification Produced DECEMBER 26. 2010 7 of 7