Request for Qualifications No. 11-11-02
Civil Engineering Services to Design Street and Drainage
Improvements
~
lIlI
S'ubmitted tl
CH.RE
&ASSOCIATES
I
\ ~Joo West Cypress Creek Road
(Suite 410
it' Fort Lauderdale, H 33309
\ll'lNY ISl
"r, ~J'
/' ..<9~ ~ lIIMPORTANT, BID ENCLOSED"
u c:l y ~. Bid No. 11-11-02
: ~ CIVIL ENGINEERING SERVICES TO DESIGN STREET AND
, DRAINAGE IMPROVEMENTS
OPENING DATE AND TIME: Friday, 12-02-11, at 10:00 AM
Submitted by: Chen Moore and...AssOCI~i."
~'.J, r-rM ~~Oe.\
V (;y CEC 0 ? 20"
"'''''''''''..I1;1IIIII'~\;~~F__
III
rtted by:
.HE
" SSOCIA TES
ORIGINAL
'")
CHeRE
&ASSOCIATES
e-"-~~r':--i::;:~t~~,i~:~~E:~'L)' I
t ,
t DEe ~~ 2t l~ll~ I'
l City of Sunny if!lss Hf)<),ch
r._....~~!~C3 of' ih:) ell'! CIG'rk i
_"_LV"__~-=---...~_",....,.,_.~
1444 Biscayne Boulevard, Suite 204
Miami, FL 33132
Telephone: (786) 497-1500
Fax: (786) 497-2300
December 1, 2011
Sunny Isles Beach Government Center
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
Subject: Request for Qualifications No. 11-11-02 Civil Engineering Services to Design Street and Drainage
Improvements
Dear Selection Committee:
\
Chen Moore and Associates (CMA) is pleased to submit our Response to the Request for Proposals for Civil
Engineering Services to Design Street and Drainage Improvements, This project will be managed from our Miami-
Dade County office located at 1444 Biscayne Boulevard, Suite 204, Miami, FL 33132.
Chen Moore and Associates is a civil/environmental engineering and landscape architecture consulting firm that is
a Florida State certified MBE firm and a certified CBE in Miami-Dade County with offices in Miami, Ft, Lauderdale,
West Palm Beach, Stuart and Gainesville, Founded in 1986, Chen Moore and Associates has grown to a staff of
28 full-time personnel who specialize in civil engineering, roadway design, drainage design, master planning,
landscape architecture, GIS (Geographic Information Systems) and construction management including twelve
licensed professional engineers and a professional landscape architect,
CMA brings to the City a vast amount of municipal and governmental engineering experience in South Florida. We
believe it is critical that the consultant for these services is knowledgeable about working in Miami-Dade County
and has experience with municipal clients. We have effectively designed projects including drainage wells and
exfiltration trench, with and without positive outfalls, in both the northern and southern parts of Miami-Dade
County and in both existing residential and commercial areas. We know the formula that works and have the right
experience for this project.
With over 25 years of municipal engineering experience and over 14 in Miami-Dade County, Chen Moore and
Associates has the local knowledge and expertise to meet your needs, Within the past five years, we have
completed roadway and drainage improvement projects for a number of municipal clients in Miami-Dade, Broward
and Monroe Counties including:
City of North Miami Beach
Village of Pinecrest
Islamorada, Village of Islands
City of Miami Beach
City of Dania Beach
City of Marathon
Key Personnel
The Chen Team feels that its organizational approach and relevant experience will be the most cost effective and
time sensitive due to our focus on being responsive to all of the City's needs. The City's point of contact shall be
Jose L. Acosta, P.E. (954,260.3987), who will serve as the project manager and Engineer of Record of the project.
Mr. Acosta has over 12 years of experience and has served as the project manager and Engineer of Record on many
similar projects for the Town of Miami Lakes and the City of Miami Gardens, He has also served in a quality control
management role with the City of Miami Beach and the Village of Pinecrest. He has previously worked on projects
throughout Miami-Dade County utilizing exfiltration trench, drainage wells, oufalls and innovative sustainable
stormwater designs for new developments and for improvement of existing neighborhoods,
City of Miami Gardens
Town of Miami Lakes
City of Key West
City of Pompano Beach
City of Fort Lauderdale
City of Coral Springs
Ilr{) NO./I-/I-{)) Civil J:l/lfil/eeril1lf Services 10 Uesilfl/ Slreel ill/d Until/illfe Il/1prrll1el/1eI/ts
)
Mr. Acosta will lead a CMA team of talented professionals who will utilize their previous experience on similar
projects of similar size and budget to execute a successful result for the City of Sunny Isles Beach. Together these
professional engineers can address the most important concerns for this project: appropriate drainage; grading
for an urban corridor; maintaining the pedestrian experience; protecting existing landscape features, especially
canopy trees; and addressing the concerns of business owners and residents. They include the following: Oscar
Bello, P.E. (over twelve years of experience - drainage design), Michael Buick, P.E. (over 11 years of experience
_ government permitting), Meghan Wells, E.I., LEED AP (over two years of experience - utility coordination and
design), and Marlon John (over nine years of experience - construction administration). This team has recent and
current experience working on these types of projects in Miami Beach, Miami Gardens, Pinecrest, Miami Lakes
and North Miami Beach.
In addition, Dr. Ben Chen, P.E., BCEEis always available to attend meetings and to participate in project presentations
to stakeholder groups, advisory boards, and elected officials. Together, Dr. Chen and I have over 4S years of
combined experience, including continuing services contracts. We pride ourselves on the kind of service that can
only be found in smaller organizations because every client is important to us.
Subconsultants
Nutting Engineers of Florida, Inc. provides a wide variety of engineering and materials testing services including
threshold Inspections. Geotechnical engineering services include investigations, analysis, and recommendations
for site feasibility, foundations, embankments, pavements, retention structures, and other earthworks projects.
Stoner and Associates, Inc. has over 25 employees including four licensed professional surveyors and mappers
supervising six survey field crews. Stoner and Associates has developed a reputation as a professional, reliable
company that provides accurate surveys, legal documentation and associated services combined with dependable
service for over a decade.
Chen Moore and Associates has been involved in all stages of a project, including planning, design, permitting,
grant preparation and administration, contract administration, construction management and public relations.
We have extensive experience working on roadway and drainage projects in heavily utilized as well as residential
rights-of-way and the expertise to effectively develop construction documents that minimize disruptions to the
public while ensuring a successful project within the budget. Our ability to utilize GIS to assist in the data collection
along with our surveyors allows us to be more cost effective and, more importantly, allows us to find project design
solutions sooner.
We understand that the goal of the project is to create practical and effective designs, addressing the stormwater
requirements ofthe project in the most cost effective manner, while giving top level service to the City of Sunny Isles
Beach and its residents. Through our extensive experience, we also understand the importance of communication
with the residents before, during and after construction to make the construction process as seamless as possible
for all parties involved.
Because we are locally based and have been in Miami-Dade County for over 14 years, we are very familiar with
the applicable regulatory agencies and have well-developed working relationships with all permitting agencies,
including Miami-Dade County DERM, South Florida Water Management District, Miami-Dade County Public Works,
Florida DEP and the Florida Department of Transportation.
Should you have any questions, please do not hesitate to contact me at (786) 497-1500 or pmoore@chenmoore.com.
Respectfully submitted,
CHeRE
M5SOC'AIIiS
!IrQ No.II-/HJ) (Wi! J:11!Jilll'eril1lj Servires II! IJrsi!lll.\lreetllllcl IJrail1l1YI' IIIl/lrol'I'IIIl'lIt.1
2
Table of Contents
)
Section
Title
Page Number
1
Cover Letter. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
Table of Contents. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Company Information....................... ............ .1-1
. Fictitious Name Certificate. . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3
. Corporate Charter. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-4
. Insurance Certificate. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-5
. Miami-Dade County CBE Certificate.................... .1-6
. State of Florida MBE Certificate....................... .1-7
Qualifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1
. Schedule.......................................... .2-4
. Project Experience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-5
Staffing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-1
. Resumes........................................... .3-4
Approach / Methodology. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-1
References. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-1
Office Locations........................................ .6-1
Contract Forms. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-1
2
3
4
5
6
7
\
J
)
1. Company Information
Name of Agency/Company (including any "Doing Business As" names)
The firm's full legal name is Chen and Associates Consulting Engineers, Inc. Our "Doing Business As"
firm name is Chen Moore and Associates. Prior to January 1, 2011, the firm was known as Chen and
Associates. A copy of our fictitious name certificate is on page 1-3.
Company Locations
Miami-Dade Office
1444 Biscayne Boulevard, Suite 204
Miami, FL 33132
Telephone: (786) 497-1500
Fax: (786) 497-2300
Contact Person: Jose Acosta, P.E.
Note: The Miami-Dade office will be the responsible office for RFQ# 11-11-02, Civil Engineering
Services to Design Street and Drainage Improvements for the City of Sunny Isles Beach.
Broward Office
500 West Cypress Creek Road, Suite 410
Fort Lauderdale, FL 33309
Telephone: (954) 730-0707
Fax: (954) 730-2030
Palm Beach Office
500 Australian Avenue South, Suite 710
West Palm Beach, FL 33401
Telephone: (561) 746-6900
Fax: (561) 746-8333
\
; Gainesville Office
14 East University Ave, Suite 206
Gainesville, FL 32601
Telephone: (352) 374-1997
Fax: (352) 244-0875
Stuart Office
510 SE Dixie Highway
Stuart, FL 34994
Telephone: (772) 919-7018
Fax: (772) 919-7019
Subconsultants
Nutting Engineers of Florida Inc.
2051 NW 112th Avenue
Suite 126
Miami, FL 33172
Stoner and Associates, Inc.
4341 SW 62nd Avenue
Davie, FL 33314
Internet Web Site Address (if any)
www.chenmoore.com
~)
\
I
Details of Entity Business Structure (Corporation, Partnership, LLC)
Chen Moore and Associates Florida corporation. A copy of our corporate charter is located on page 1-4.
A copy of our fictitious name certificate is on page 1-3.
Date Founded
November 7, 1986.
Home office address, telephone number, and local address and phone number
Home Office Address
500 West Cypress Creek Road, Suite 410
Fort Lauderdale, FL 33309
Telephone: (954) 730-0707
Local Address
1444 Biscayne Boulevard, Suite 204
Miami, FL 33132
Telephone: (786) 497-1500
List of any outstanding litigation that would threaten the viability of the firm or the performance of
this contract
Neither Chen Moore and Associates nor its parent or subsidiaries, predecessor organization(s), nor any
wholly owned subsidiary has had any claims, arbitrations, administrative hearings, or lawsuits brought
by or against the firm during the last five years.
Proof of insurance
Please see page 1-5.
Indication of how long it would take to implement service after authorized to begin
Key personnel are currently ready to and available to begin work on this project and will work with the
City's schedule to complete the design, permitting and bid documents within the City's schedule.
Please refer to the schedule included in Section 2, Qualifications, for a detailed outline of our proposed
time line.
)
APPLICATION FOR REGISTRATION OF FICTITIOUS NAME
REGISTRA TION# G11 000014388
Fictitious Name to be Registered: CHEN MOORE AND ASSOCIATES
Mailing Address of Business:
500 W. CYPRESS CREEK ROAD
SUITE 410
FT. LAUDERDALE, FL 33309
Florida County of Principal Place of Business: BROWARD
FEI Number:
FILED
Feb 07,2011
Secretary of State
Owner(s) of Fictitious Name:
CHEN AND ASSOCIATES CONSULTING ENGINEERS, INC.
500 W. CYPRESS CREEK ROAD, #410
FT. LAUDERDALE, FL 33309 US
Florida Document Number: J41454
FEI Number: 59-2739866
\
,
I the undersigned, being an owner in the above fictitious name, certify that the information indicated on this form is true and
accurate. I further certify that the fictitious name to be registered has been advertised at least once in a newspaper as defined
in Chapter 50, Florida Statutes, in the county where the principal place of business is located. I understand that the electronic
signature below shall have the same legal effect as if made under oath and I am aware that false information submitted in a
document to the Department of State constitutes a third degree felony as provided for in s. 817.155, Florida Statutes.
PETER MOORE
Electronic Signature(s)
02107/2011
Date
Certificate of Status Requested ( )
Certified Copy Requested ( )
1
State of Florida
Department of State
I certify from the records of this office that CHEN AND ASSOCIATES
CONSULTING ENGINEERS, INC. is a corporation organized under
the laws of the State of Florida, filed on November 7,1986.
The document number of this corporation is J41454.
I further celiify that said corporation has paid all fees due this office
through December 31, 2011, that its most recent annual report was filed
on January 14, 2011, and its status is active.
I further certify that said corporation has not filed Aliicles of
Dissolution.
Givel/ ul/der my hal/d amI the Great Seal of
Florida, at Tallahassee, the Capital, this the
Fifteel/th day of Jal/uary, 2011
~'U6
Secretary of State
Authentication 10: 800191408568-0 11511-J41454
To authenticate this certificatc,visit the following site, enter this
10, and then follow the instructions displayed.
h ttps:/ / efile.sun biz.orglcerta u th ver.h tm I
I
.1
)
MIAMI..
~iiiI'
Small Business Development
111 NW 1 st Slreet . 19th Floor
Miami, Florida 33128-1906
T 305-375-3111 F 305-375-3160
Carlos Alvarez, Mayor
miamidade.gov
January 12, 2011
CERT. NO: 4424
APPROVAL DATE(s): 02/28/2011 - CBE Tier 2
EXPIRATION DATE: 02129/2012
Ms. Peter Moore
CHEN AND ASSOCIATES CONSULTING ENGINEERS,
INC.
420 Lincoln Rd, Suite 444
Miami Beach, FL 33139-0000
Dear Ms. Moore:
The Department of Small Business Development (SBD) has completed the review of your application and
attachments submitted for certification. Your firm Is officially certified as a Community Business
Enterprise (CBE) in the categories listed below.
This certification is valid for twelve (12) months, which will expire on February 29, 2012. This certification
affords your company the opportunity to benefit from participation in county contracts with small business
measures. Please note the trade categories listed below. These are the only sheltered market areas that
your company Is eligible to bid or participate In under your current certification.
If any Changes occur within your company during the certification period (such as ownership, address,
telephone number, trade category, licensing, technical certification, bonding capacity, or if the business
ceases to exist) you are required to notify this department within 30 days in writing. It is of critical
importance that current information regarding your company be maintained. All inquiries or changes
related to this certification should be directed to Coralee Walkine-Taylor at coralee@miamidade.gov in
the Certification Unit. An application for re-certification must be submitted and forwarded to this office
four (4) weeks prior to the referenced expiration date. Should your firm fail to re-certify, or lose its
certification for any reason, the ability to work on contracts with measures will be affected. Thank you for
doing business with Miami-Dade County.
\
,
CATEGORIES: (Your firm may bid or participate on contracts only under these categories)
HIGHWAY SYSTEMS.SITE DEVELOP/PARKING LOT DESIGN (CSE)
HIGHWAY SYSTEMS.HIGHWAY DESIGN (CSE)
HIGHWAY SYSTEMS-TRAFFIC CALMING (CSE)
W & S SEWER SYS.WATER Dlin & SANITARY SEWAGE COLL (CSE)
W & S SEWER SYS.MAJOR WATER & SEWER PUMPING FACILI (CSE)
W & S SEWER SYS.W & S SEWAGE TREATMENT PLANT (CSE)
ENVIRONMENTAL ENG-STORMWATER DRAINAGE DESIGN SERV (CSE)
GENERAL CIVIL ENGINEERING (CSE)
ENGINEERING CONSTRUCTION MANAGEMENT (CSE)
VALUE ANAL YSISlLIFE.CYCLE COSTING-WATER & SANITARY (CSE)
VALUE ANAL YSISlLlFE.CYCLE COSTING.GEN CIVIL ENG (CSE)
HIGHWAY SYSTEMS.SIGNING, PAVEMENT MARKING, CHANNEL (CSE)
ENGINEERING SERVICES (CSE)
."" I. . . // t ~
! ) . ')' "" { ,- \ ..." , .'--l't".." i)'(l/
~ (':, (~f~f Il-;.' L-/ '- ( (' ~ L (.' U (' L-- f . I, -. I
() -..1 .oJ
DBDROO20 v2010t108
.j
')
\
,
,
MIAMI..
mmiiil
Small Business Development
111 NW 1 Street, 19'h Floor
Miami, Florida 33128
T 305-375-3111 F 305-375-3160
miamidade.gov
April 19, 2011
CERT. NO: 14476
APPROVAL DATE(s): 0411812011 - CBE Tier 2
EXPIRATION DATE: 0413012012
Mr. Richard Wohlfarth
NUTTING ENGINEERS OF FLORIOA INC
1310 Neptune Dr
B~ton Beach, FL 33426
Dear Mr. Wohlfarth:
The Departrrent of Small Business Dewlopment (SBD) has completed the re\iew of ~r application and
attachrrents submitted for certification. Your firm is officially certified as a CorrmJnity Business Enterprise
(CBE) in the categories listed below.
This certification is ..alid for twell.e (12) rrooths, lMlich v.ill e>q:lire on April 30, 2012. This certification affords
\OUr corrpany the opportunity to benefit from participation in county contracts v.ith small business
measures. Please note the trade categori.es listed below. These are the only sheltered marl<et areas that
lOur companyis eligible to bid or participate in under lOur current certification.
If any changes occur v.ithin ~r corrpany during the certification period (such as O'M1ership, address,
telephone number, trade category, licensing, technical certification, bonding capacity, or if the business
ceases to ellist) ~ are required to notify this department v.ithin 30 day.;; in writing. It is of critical
irrportance that currentinformation regarding ~r company be maintained. All inquiries or changes related
to this certification should be directed to Adriana Coba at cobaa@mianidade.govin the Certification Unit.
An application for rG-certification must be subrritted and forwarded to this office four (4) 'Mle~ prior to the
referenced e>q:liration date. Should ~r firm fail to rG-certify, or lose its certification for any reason, the
ability to oorkon contracts v.ith measures v.ill be affected. Thank ~ for doing business v.ith Miani-Dade
County.
)
Sinc~
Panel sley
Direct
CATEGORIES: (Your firm may bid or participate on contracts only under these categories)
DRIlLING SUBSURFACE INVESTIGATIONS & SEISMOGRAPHIC (CBE)
GEOTECHNICAl & MATERIALS ENGINEERING SERVICES (CBE)
CONCRETE AND ASPHAlT TESTING SERVICES (CSE)
ENVIRONMENTAl ENG-CONTAMINATION ASSESS & MONITOR (CSE)
ENGINEERING SERVICES (CSE)
DBDROO2O'<20101106
)
2. Qualifications
Chen Moore and Associates (CMA) is a multi-discipline consulting firm that is a Florida State MBE
certified and locally certified CBE firm located in Miami, Fort Lauderdale, West Palm Beach, Stuart
and Gainesville, Florida. Chen Moore and Associates, founded in 1986, has grown to a staff of 28 full-
time personnel. The firm has successfully completed a wide range of projects involving the planning,
design and construction in a multitude of disciplines including:
. Civil Engineering including drainage, roadway, water distribution/supply/treatment, wastewater
collection/transmission/treatment/disposal, pump station design and rehabilitation, utility
coordination and stormwater pollution prevention
. Environmental Engineering
. Infrastructure Master Planning
. Site Master Planning
. Landscape architecture and urban design including hardscape design
. Reuse and Irrigation Design
. Program Management
. GIS analysis and mapping
. Grant and loan services
. Bidding and Construction Administration Services
. Construction management, supervision, inspection and administration.
The firm includes 12 licensed professional engineers, seven LEED Accredited Professionals and a licensed
landscape architect. The firm is celebrating its 25th anniversary in business serving South Florida and
our Miami Office is celebrating its 14th anniversary in Miami-Dade County.
\
CMA's Unique Qualifications for this project
. The Chen Moore Team is prepared and available to expedite the project for the City of Sunny Isles
beach upon receipt of a Notice to Proceed. Tasks already completed and information aleady
obtained include:
Site visit has been conducted
Analysis of existing aerials and UDAR data
Identifying, contacting and receipt of as-built/altas'
for existing utility information
Performed preliminary GIS analysis and stormwater
model
Coordination with out geotechnical investigation
team members to obtain general subsurface
conditions to conduct a preliminary evaluation of
possible solutions
Identification of additional items to be considered
in the development of the proposed project solutio. E;.:;__
c..".--............
current codes requirements regarding ADA gradin ;~ . ~
driveway access connections to the project area/coo 'sf . "._ '
Preliminary discussions with regulatory agencies :' "8l: ..;~
concerning the possible solutions to identify both
time saving and cost saving opportunities for the
City in proposing a solution.
. The Chen Moore Team has worked together on
numerous projects with very similar scope and budget
for several municipalities successfully.
=~::~
.,.,.
."0
."
.."
:::.:
.,..
~~:).
~
(I
,~
CitvofSunrryl$.lesBeach
NE 174Slfeel
DraioagllAnalysis
r.og\l'e2: E.isl:ingDainageStrudu'll'S
~
)
.....,-."'"
. The staff and subconsultants proposed in this submittal are the same team that has served Miami
Lakes, Miami Gardens, Miami Beach and Pinecrest. This team has a proven track record.
. The Team's experience in municipalities with residential components similar to the NE 174 Street
Neighborhood allows the City of Sunny Isles Beach to reap the benefits of the experience and
lessons learned in other Miami-Dade County municipalities.
. CMA works with over 30 municipalities in Miami-
Dade, Broward and Monroe Counties. This allows
CMA to truly be the City of Sunny Isles Beach's
consultant and advisor in regards to the design,
permitting, bidding process and construction
process. Experience counts.
. Our track record and tactics to communicate with
residents during construction with City staff or
through public meetings is a significant advantage.
Even the best design needs to be communicated
properly. Empowering the community through the
process makes a difference.
{iJ,
Clly or Sunny Isles Beach
NE 174Streel
OrainageAnalysis
Figure 3: L0(:3oonMap
"~
The CMA Advantage
. Chen Moore and Associates believes in creating sustainable communities. As such, Chen Moore and
Associates has been involved in over $350 million of redevelopment projects for Broward County
since 1992, including BODRs, design, permitting and construction services including improvements/
rehabilitation projects and coordination with historical districts.
. Chen Moore and Associates recently hosted LEED Training in our offices.
. Chen Moore and Associates is committed to the communities where we work. We are involved for
the long term to be part of your communities' past, present and future.
\
I
)
\
I
Schedule
9 4~UOIAI
"
Q)
Q)
u
o
...
c..
o
....
Q)
u
',c
o
z
E
o
...
-
Q)
E
i=
S 4~UOIAI
17 4~uOIAI
E 4~UOIAI
Z 4~UOIAI
"0
OJ
W
Ci
E
o
u
c
o
'.p
co
c
-c
'-
o
o
U
.-t=
E
'-
ClJ
a..
>-
'-
co
c
'E
Qj
'-
a..
"0
2:l
ClJ
Ci
E
o
u
*
c
o
".p
co
c
:0
'-
o
o
u
>-
"-t=
'.p
::l
"0
OJ
+-'
OJ
Ci
E
o
u
Vl
~
OJ
OJ
$:
N
Vl
E
e
o
~
N
'"
~
OJ
OJ
$:
N
~
o
o
.-l
tlO
C
"C
ClJ
ClJ
C
"00
C
UJ
co
c
u:
OJ
:i
"0
OJ
..c
u
Vl
+-'
e
.~
o
OJ
:J
"0
OJ
..c
u
Vl
+-'
e
.~
o
....
OJ
0..
'"
OJ
o
z
OJ
.0
+-'
o '"
~ E
'3 ::J
e
'" 0
OJ u
'g~
tn ~
tE E
~ 5
+-' ....
VI ':;
QJ e
E OJ
:J OJ
VI :t:'
'" '"
co e
OJ 0
> 0
.8 e
co ~
OJ co
:i OJ
~ Qj
..c..c
u +-'
Vl"O
"0 e
2:l co
co "0
E ~
".p .s
..'tl er
~
ClJ
:J
"0
B
OJ
E
..p
'"
:;:
OJ
"S;
OJ
cr::
~
o
....
.E
OJ
E
..p
:;:
OJ
.S;
~
~
OJ
OJ
:;:
N
e
o
"0
OJ
'"
'"
.0
.~
OJ
:i
"0
OJ
..c
u
Vl
'"
o.O~
.8 "E
"_ -0
E ~
~b
+-' ClJ
e E
OJ ..p
E +-'
e '"
Qj a:;
~ E
bO".p
o :;:
- ClJ
.s .~
e ....
o >-
E ~
N ~
'" '"
2:l e
'" 0
.9- "0
.~ ~
e '"
co-O
OJ bO
- e
-5 "8
l! "E
u ....
Vl OJ
,0..
....
OJ
Q.
"0
OJ
"0
.S;
~
Q.
OJ
.0
OJ
-c
'"
9
"E
"~
2
vl
-><
o
:5:
"!::!
:0
:J
a..
OJ
-c
'"
o
E
"~
2
",'
e
o
'P
'"
"!::!
e
:J
E
E
o
u
~
.3
o
I
....
..c
bO
::J Vl
o<S~
Qj ..Vl
:;:~
o Q.
0.. 0
co OJ
"00..
"t: 0
..Q ~
"-I'"
'"0
6 e
".p '"
:J '"
:g :E
tlE
o::J
I- "~
o1l:Q
\:i:~
",' ..c
e u
o co
"~ ~
.~ E
:J '"
E .-
E ~
oE
~ 0
".p z
~'Q
~ .~
V;U
OJ ....'
:e ~
p OJ
::JVl
~-g
"0 co
~ Qj
U +-'
e co
* $:
t 4~UOIAI
c
o
'J:;
ra
....
:J
o
<II
E
ra
z
~
VI
{2.
'"
~
OJ
OJ
$:
N
'"
~
OJ
OJ
$:
lD
Vl
~
OJ
OJ
$:
<:t
~
<(
o
:::::;
?i
o
~
c
"~
Vl
ClJ
o
>-
'-
co
c
E
Qj
'-
a..
~
o
~
C
tlO
"Vi
<II
o
3:
ClJ
.:;:
ClJ
cr::
>-
....
(]
tlO
C
:€
E
'-
ClJ
a..
....
c
ClJ
E
c
....
ClJ
>
o
t!J
co
....
co
o
c
o
".p
co
>
~
UJ
tlO
C
".p
Vl
'x
UJ
3:
ClJ
.:;:
ClJ
cr::
>-
....
(]
co
c
u:
....
OJ
0..
ClJ
u
C
co
....
"~
Vl
Vl
<(
tlO
C
-c
-c
co
Vl
....
::l
o
ClJ
Vl
o
Q
o(l
Vl
ClJ
u
.:;:
'-
ClJ
</l
C
o
'.p
u
2
....
Vl
C
o
U
co
e
o e
..p 0
:O'P
"0 co
'" e
...."0
a 0
e 8
>-OJ
E~
, OJ
"O..c
OJ u
.... '"
.s "0
ere
~ co
~~
, e
'" OJ
g,oE
.~ .~
OJ :J
E ~
"~
:Q ::J
:J ".p
0.. 0
, e
=
'3
'"
OJ
u
.~
OJ
'"
e
o
..p
u
2
+-'
'"
C
o
u
"0
C
co
OJ
u
e
~~
'Vi ::J
","0
co OJ
bO..c
.S ~
"0 +-'
"0 C
di "~
,w
Project Experience
Lake Patricia Neighborhood Roadway & Drainage Improvements, Miami Lakes, Florida
This project consists of the implementation of drainage improvements identified on the most recent
;" Town of Miami Lakes Stormwater Master Plan within approximately one
square mile of an existing residential neighborhood near Lake Patricia in
southern Miami Lakes near Ludlam Road. Services include utility
coordination, schematic and final design phases, government permitting,
bidding assistance, construction administration and statements of work
completion. The CMA team modeled the existing conditions to derive the
best value locations for stormwater improvements, while maximizing and
improving the current stormwater system. The designs included connecting
portions of the existing system and utilizing strategic locations for
exfiltration trench to increase the overall storage capabilities of the
neighborhood.
CMA is also assisting Miami Lakes with the acquisition of a Federal
Emergency Management Agency (FEMA) Hazard Mitigation Grant. This
task entailed rainfall data collection, additional pre-improvement versus
post-improvement stormwater analysis using GIS, analysis of potential
damages to homes during various rainfall events using Army Corp of Engineers (ACOE) criteria and
the comparison of benefits versus cost of the project. These tasks were compiled in a report that was
submitted to FEMA for review.
Client
Town of Miami Lakes
Hiram Siaba
15150 NW 79 Ct, 1st Floor
Miami Lakes, FL 33014
(305) 364-6100
)
--,
\
,
NW 191st Street Area Drainage Improvements, Miami Gardens, Florida
Chen Moore and Associates (CMA) was asked by the City of Miami Gardens to design the stormwater
improvements for the residential area from NW 9th Avenue to NW 10th Place and from NW 191st Street
to NW 193rd Street. The design had a total construction budget of over $400,000 per a grant received
by the City. CMA evaluated the existing site conditions to strategically design roadway, drainage and
sidewalk improvements to meet the most critical needs of the City and maximize the value of their
construction budget.
The design included strategic placement of exfiltration trench at key areas of the existing residential
area, while looking for opportunities to interconnect portions of existing systems that has been working
independently. Strategic areas were chosen to be regarded per the results of the drainage modeling.
The design considered elements related to the pedestrian paths and parallel parking adjacent to Norland
High School. The project scope included government permitting, bidding services and construction
administration to support the efforts of City staff.
CMA has worked with the City on a number of additional projects under our continuing services contract
providing similar roadway and stormwater engineering services as well other services. Example
additional projects CMA has successfully completed for the City of Miami Gardens include:
. Miami Gardens GIS Stormwater Atlas
. NW 38 Court Drainage Improvements
. 133.003 NW 38 Ave to NW 38 Place (NW 208 Street to NW 209 Street) Drainage Improvements
. 133.002 NW 19th Ave To NW 21st Ave: from NW 191 Tr To NW 26th St Drainage Improvements
. Le Jeune Bridge Design Build Criteria Package
Client
City of Miami Gardens
Mariana Pitiriciu, P.E.
1050 N.W. 163rd Dr.
Miami Gardens, FL 33169
(305) 622-8000 x3386
)
1
I
I
I
I
)
_./
Village of Pinecrest (Various Projects), Pinecrest, Florida
SW 72nd Avenue
Chen Moore and Associates (CMA) modeled the existing stormwater conditions along SW 72nd
Avenue from SW 112th Street to SW 120th Street to determine the existing level of service on the
roadway and the swales adjacent to large estates. CMA utilized GIS and developed an AdlCPR model to
determine the appropriate rain storm elevations for the desired level of service and prepared drainage
improvement plans along the right-of-way. Improvements included additional positive drainage
connections and strategic locations for exfiltration trench. CMA met with each resident with Village
officials to communicate and coordinate changes while working to minimize potential conflicts during
construction.
The design included minor traffic/roadway modifications, ADA grading considerations along with
a significant effort to balancing the residents' requests to protect the existing mature tree canopy
while addressing expectations for drainage. The plans were reviewed by Miami-Dade County Public
Works, the Miami-Dade Department of Environmental Resource Management (DERM) and the Village.
Services included bidding assistance, meetings with each resident adjacent to the project, construction
observation/inspection and project closeout services.
SW 60th Avenue Sidewalk and ROW Improvement Project, Pinecrest, Florida
Chen Moore and Associates prepared sidewalk expansion plans for over 2 Yz miles of sidewalk within an
existing wooded estate residential community. The design included traffic/roadway modifications, ADA
grading considerations along with a significant effort to balancing the Miami-Dade County Public Works
specifications with the residents' requests to protect the existing mature tree canopy.
The project included rights-of-way within the Village of Pinecrest and the City of Coral Gables. The
plans were permitted via both municipalities and Miami-Dade County Public Works. Services included
bidding assistance, meetings with each resident adjacent to the project, construction observation/
inspection and project closeout services.
In addition to the above project descriptions, CMA
has successfully completed over 20 additional
projects including providing roadway and
stormwaterengineeringservices, drainage reviews,
dog park design concepts, turn lane design and
sidewalk projects. Additional projects CMA has
completed for the Village of Pinecrest include:
. Flagler Grove Park Left Turn Lane
.----....-...--.
. Suncrest Drive & Moss Ranch Road Stormwater :::::;==::::::::::--
............---.,.......-....-.-
Improvements .=~=_._--
. SW 104th Street Drainage Improvements
. SW 105th Terrace Roadway Improvements
. SW 64th Court Drainage Improvements
. SW 73 Avenue (SW 93 Terrace to SW 96th Street) Drainage Improvements
. SW 72 Court Drainage Analysis
. SW 79th Avenue Roadway Improvements
. SW 69th Avenue and SW 90th Street Roadway Project
. Veteran's Way Dog Park Conceptual Plans
Client
Village of Pinecrest
Daniel Moretti
10800 Red Road
Pinecrest, FL 33156
(305) 669-6916
.---..-..-..-----
..................-..--
.---...-.......-.-.-
"'__..__.......,.....tJ___
)
NE 173rd Street Right of Way Improvements, North Miami Beach, FL
Chen Moore and Associates prepared right-of-way improvement plans for NE 173rd Street from West
Dixie Highway to NE 23rd Avenue within an existing residential community. The design included
storm~~ter improveme~ts, g
formalizmg of onstreet parkmg, . .
traffic/roadway modifications,
sidewalks with ADA grading
considerations and preserving and
incorporating existing trees and
resident requests. This project also
included the design of a traffic circle
to provide traffic calming as well as
streetscape beautification with a
stamped concrete apron and
landscaping. The design plans were
permitted via the City of North Miami
Beach, Miami-Dade County
Department of Environmental
Resources Management and Miami-Dade County Public Works Traffic Engineering Department. Services
included design, permitting, bidding assistance and limited construction administration services.
CMA has worked with the City on a number of additional projects under our continuing services contract
providing similar roadway and stormwater engineering services as well other services. Example
additional projects CMA has successfully completed for the City of North Miami Beach include:
. CRA Infrastructure Master Plan
. Highland Village Sewer Improvements
. Western Eastern Shores Right of Way Improvement Project (Stormwater/Roadway Improvements)
. NW 172nd Street Right of Way Improvements Project (Stormwater/Roadway Improvements)
. NE 168th Street Right of Way Improvements Project (Stormwater/Roadway Improvements)
. NE 18th Street Right of Way Improvements Project (Stormwater/Roadway Improvements)
Client
City of North Miami Beach
Hiep Huynh, P.E.
17050 NE 19 Avenue
North Miami Beach, FL 33162
(305) 948-2925
.
-
,-~
Sunset Islands 1 & 2, Miami Beach, FL
Chen Moore and Associates is providing planning, modeling, design, permitting, preparation of
construction documents, bid and award and construction engineering and observation services
for infrastructure improvements within the public righ of way areas of the Sunset Islands I and II
neighborhood of Miami Beach. The project encompasses approximately 11,000 LF of ROW infrastructure
improvements including watermain replacements, stormwater drainage improvements, paving and
grading, streetscaping enhancements and roadway reconstruction. The project also required extensive
coordination with the public, the homeowners association, and various regulatory agency.
As part of the project stormwater and drainage services, extensive analysis was conducted utilizing ICPR
modeling and GIS to meet and/or exceed required stormwater Level of Service standards. The proposed
stormwater design included the introduction of catch basins and stormwater piping to effectively collect
and route the stormwater to 11 existing outfalls to Biscayne Bay. Due to the environmental sensitivity
of Biscayne Bay design and implementation of water quality treatment measures was an important
c)
)
consideration and design factor of the system prior to outfall to the Bay which included utilizing
exfiltration trench. Additionally, as the outfalls were existing a review and evaluation of the conditions
of the outfalls was conducted and rehabilitation, upsizing and retrofitting the existing outfalls was a
part of the final design. This project was closely coordinated with regulatory agencies at the outset of
the project and throughout the design to ensure an expedient review and issuance of the permit.
- .;.--:-=...~. .'-.1- ,- .-
iI: r;. #:i:;; a?blll'...~.ff~~r~'';~''
~"'fl.., ~, " . \0- r." f::.. . J...., "',;$"...-
~.. .. :'. . .... ~" . ",fflAJV :. . . ~
ii"' " ,pre .if W;.' '~ J.J' ~r 'of,' l'P." 'q l""Vi
: '"," 'J "';'1: Ilh'~ ~~ l.il .'.i.\ .~~ ~ ,~....O:.'
. ~ ""...... ~ 'I' "", ~.... s:r. . \ ..
~: ,q.W"~ -:-f~; ..'tl 11 -rA'~ -~ g :.-:c,
. ~ ~ ..r.o ,. ..,.. ., .j, .. ".M . ,.
., ,j a I';' A 11 h_ ,.~....... ~..,., .-c"
'~ . ' , '.. 0" ..~.
\tr;~~~' j;:;' '.~. t~:~,~~-,i' .~~ ~~~~'r.~.
... . Q . ....~ <5 0"'..-_9t. .,.'. - 'W .n
-,'--- --'ji-~'("- ;:: ;;. .. -. -...... .~ - --..-
~ .... ........
.......
C9 MIAMI BEACH
Sunset Island II
Existing Storm Drainage
o 100 ;'00
-=:=F...
.~~~~
II:..' J!M.~' i !(f'~;~:i;/' '.
~~~.';'.,~\t~'\.. .~ ~t~}.-: \
:'~<;p ."...~". -I .sf .,' ...
/"~ '7-:' ~ '. gT.,.,~. ;:-': ;- "" ,'. _ ".-'';)=
'. ~, -f.'''I ~I I~~, If' ('lilt'" '
:.:t.. ,. ~~"O. Bail' ... ~..'1. ,. ~.
....k. pw;Jl. a."'~ -L,1 \oil. . .:..r.1 -.
(l.;.,.... .. '. / · \
'.: .~.:.... , ,"',~ 1i ::'i. ":I~t~ ~. ?>o/
~ ~!11..._~, i...,. ,~9:,,"!_.._n. _ ~~:...t(,i.\ '~'"i~
...... ~-i _ _"'I -~1- r..p - -_ "'':- :d..-.
~
.......
C9 MIAMI BEACH
Sunset Island I
Existing Storm Drainage
o '00 ~
~~.
.~JQ9;\~U:~~
.-. j
.
Client
Miami Beach
Maria Hernandez
1700 Convention Center Drive
Miami Beach, FL 33139
(305) 673-7000 ext 2584
South Pointe Phase III!IV/V - ROW Roadway and Drainage Improvement Project, Miami Beach, FL
Chen Moore and Associates is providing surveying, planning, geotechnical investigation, modeling,
design, permitting, preparation of construction 1.;
documents, bid and award and construction
engineering and inspection services for
infrastructure improvements within the public
right of way areas of the South Pointe III/IV/V
neighborhood of Miami Beach. The project
encompasses approximately 19,000 LF of ROW
infrastructure improvements including water t\ Ii" __,
main replacements, stormwater drainage I.
improvements, paving and grading, streetscaPingi:~;.
enhancements, landscaping improvements,~;
lighting improvements, and roadway.:;'
reconstruction. This project also required
extensive coordination with the public, adjacent CRAs, historic districts and various regulatory
agencies.
)
As part of the proposed stormwater and drainage services, extensive analysis was conducted utilizing
ICPR Modeling and GIS to meet and/or exceed required stormwater Level of Services standards. The
proposed stormwater design included the introduction of catch basins, and stormwater piping to
effectively collect and route the stormwater to 16 drainage gravity wells and stormwater pump station
with overflow outfall connections to Biscayne Bay. Due to the environmental sensitivity of Biscayne
Bay design and implementation of water quality treatment measures was an important consideration
and design factor of the system prior to outfall to the Bay and was closely coordinated with regulatory
agencies during the permitting process.
Client
City of Miami Beach
Carla Dixon
777 17th Street, 3rd Floor
Miami Beach, FL 33139
(305) 673-7071
City Center Right of Way and Utility Improvement Project, Miami Beach, FL
Chen Moore and Associates surveying, planning, geotechnical investigation, design,
modeling, permitting, preparation of construction
documents, bid and award and construction engineering
and inspection services for infrastructure improvements
within the public right-of-way areas of the City Center
neighborhood of Miami Beach.
:#J!
,._, ,. -1 The project encompasses approximately 24,000 LF of
': .I' '1 L ROW infrastructure improvements including water main
" J
--,_, - replacements, sanitary sewer upgrades, stormwater
""j a 1"-::1 ~";, '- ""'7'< drainage improvements, pavingandgrading,streetscaping
.Ii ;1: ~ enhancements, landscaping improvements, lighting
_t.:iIIiI.ir^'~, .._(~...J improvements, and roadway reconstruction. This project
also required extensive coordination with the public,
adjacent CRAs, historic districts and various regulatory agencies.
As part of the proposed stormwater and drainage services, extensive analysis was conducted utilizing
ICPR Modeling and GIS to meet and/or exceed required
stormwater Level of Services standards. The proposed stormwater
design included the introduction of catch basins and stormwater
piping to effectively collect and route the stormwater to 16
drainage gravity wells with overflow outfall to Dade Canal. Water
quality treatment was an important consideration and design
factor of the system to ensure that appropriate treatment was
provided prior to discharge to the gravity wells and outfalls.
Client
City of Miami Beach
Carla Dixon
777 17th Street, 3rd Floor
Miami Beach, FL 33139
(305) 673-7071
")
\
,
University Drive Improvements, Cooper City and Davie, Fl
The Chen Moore Team designed a new right turn lane and bus bay from University Drive (FOOT SR
817) into the future entrance to the Town Center component of the Monterra Development in Cooper
City (north of Sheridan Street). The project required the design and construction of two - 9 foot box
culverts (approximately 120 LF), the demolition and relocation of +/- 2,000 LF of water main from Davie
Utilities and doubled the width of +/- 2,000 LF of the existing Central Broward Water Control District
(CBWCD) canal along University Drive. Coordination efforts were conducted with the CBWCD, Town of
Davie Engineering, Town of Davie Fire Marshall, Town of Davie Utilities, Cooper City Utilities, Broward
County and the Florida Department of Transportation. The project was completed simultaneously with
the University Drive Canal Expansion Project. Chen Moore and Associates' services included roadway,
drainage, earthwork and utility design; government permitting; conducting public bidding for the
Monterra Community Development District (CD D); construction observation and closeout services.
Client
CM Monterra Property LLC
James Wright
135 San Lorenzo Ave Ste 740
Coral Gables, FL 33146
(305) 632-2990
Solano Avenue Roadway Design and Construction Administration, Cooper City, Fl
Chen Moore and Associates designed an over half-mile long roadway that connects Sheridan Street
and University Drive, mixed-use residential areas and the Town Center component of the Monterra
Development in Cooper City. Solano Avenue was designed to create a relationship between the mixed-
use residential, Town Center, pedestrian walkways, parallel parking and green spaces to promote
walkability, social interaction and give the area a sense of community. This required a variance to
reduce and relocate the required berm along the property frontage to the roadways. Chen Moore and
Associates' services included roadway, drainage, earthwork and utility design; government permitting
including PMUD rezoning; conducting public bidding for the Monterra Community Development District
(CD D); construction observation and closeout services.
Client
CM Monterra Property LLC
James Wright
135 San Lorenzo Ave Ste 740
Coral Gables, FL 33146
(305) 632-2990
)
I
I
Fort Lauderdale-Hollywood International Airport Stormwater Master Plan Update Phases I and II,
Broward County Aviation
Client
Broward County Aviation Department
Carlos Hernandez
100 Aviation Boulevard
Ft. Lauderdale, FL 33315
(954) 359-2255
Neighborhood Improvement Project - Traffic Calming, Dania Beach, FL
Chen Moore and Associates designed and administered the construction of a series of traffic calming
elements. The design included 5 roundabouts, 2 raised
intersections, 2 speed tables, 3 raised medians, 2 partial
closures, a bike lane and 10 speed humps. The project is located
SE of Dania Boulevard and US 1 with challenges that included
right of way limitations and easement considerations,
coordination with property owners, roadway elevation
consistency, preserved County lands, and roadway realignments.
The project required coordination with other consultant projects
and agencies. The implementation of these devices will not
only help calm traffic throughout the neighborhood, making
the streets safer, it will also provide more aesthetically pleasing
elements for the residents to enjoy.
Client
City of Dania Beach
Dominic Orlando
100 W. Dania Beach Blvd.
Dania Beach, FL 33004-3643
(954) 924-3740
\
,
.......
p,.. Oania Beach Roundabouts.. u ~
IfS) Proposed Easements 'iIlF'~~~ ~
--~-
--~
c;:J--
NE 15th Avenue & 18th Street Roundabout, Fort Lauderdale, FL
The NE 15th Avenue and NE 18th Street Roundabout Safety Improvement project entailed designing
CITY OF FORT UUOERDALE improvements to the existing roundabout at which a significant
N.E.15"'AVEN';':-.~.~p~~:::::::TROUND-ABOUT amount of accidents occurred. The City wanted to modify the
existing roundabout in order to minimize construction costs while
still addressing the existing problems. Chen Moore and Associates
made design suggestions to make the incoming lanes narrower
and have more deflection in order to slow traffic. Chen Moore
and Associates also proposed connecting the bike lanes to the
sidewalk in order to eliminate bicycle traffic from going through
the roundabout.
)
I ~.I...f.1 II r:
tj' ~ ':t
}At
1'/ " , _;1
'.-'-1,f1 . ~-.'
~ ______\ J
p~~ ;; , .
'.\'.:
11;11' ,:~
,., l~ fY~
~ 1
~ ~f 1%4, @on'IClfl'Ul<<~
SOCIATES I 8, \ ~ ,;. A!
,...........-.....-. FEBRUARY 2008 ~....NI..........ru1\..:
,
-"
Client
City of Fort Lauderdale
Peter Partington
100 N. Andrews Avenue
Fort Lauderdale, FL 33301
(954) 828-5240
)
Stoner and Associates (Survey)
City of Sunrise - N.W. 136th Avenue
Performed a topographic survey of N.W. 136th Avenue, from the north approach slab of the New River
Canal Bridge to the south side of Sunrise Boulevard and from the west back of curb to the east back of
curb. Total length of project: 9,540 linear feet.
City of Sunrise - Entry Feature Walls
Performed topographic surveys for eleven sites. Surveys were for the design and construction of new
entry feature signs.
City of Miami Beach - South Pointe II
Performed a right-of-way and topographic of a southern portion of Miami Beach. Located aboveground
improvements. Prepared storm and drainage as-builts. This survey was for the re-design of roads and
drainage systems.
\
I
Nutting Engineers 0/ Florida Inc. (Geotechnical Engineering)
Sunny Isles Fire Rescue Station #10, 175 172nd Street, Sunny Isles, Florida
Nutting performed geotechnical exploration/engineering and construction materials testing services
for the construction of a new 2-story ~12,OOOSF fire rescue station.
Atlantic Isles Utility and Roadway Improvements, Sunny Isles Beach, Florida
Nutting performed geotechnical exploration/ engineering services for the drainage and roadway
improvements along the roadway that circumvent the isle.
Sunny Isles Beach Government Center, 18070 Collins Avenue Sunny Isles Beach, Florida
Nutting performed geotechnical exploration/ engineering services for the construction of a new 24 ft
by 36 ft concrete canopy to be supported on two existing and one proposed column.
Miami Beach Right-of-Way Infrastructure and Beautification Improvements
This project included the replacement of approximately 40,000 lineal feet of 8-12 inch water mains, re-
milling of roadways, and the installation of streetscapes including curbing, islands, lighting and parallel
parking.
)
"
,
3. Staffing
The Chen Moore Team feels that its organizational approach to stormwater management and
roadway design and relevant experience will be the most cost effective and time sensitive due to
our focus on being responsive to all of the City's needs. Chen Moore and Assocxiates has 28 full-time
staff including 12 professional engineers, one landscape architect, a general contractor, and engineering
inspectors to additionally support the key personnel detailed below if required.
Dr. Ben Chen, P.E., BCEE is chairman of the firm and will serve as QA/QC for this project. His experience
includes urban infrastructure renewal, roadway design, stormwater management, water and wastewater
treatment facilities design and construction management, facilities planning, environmental studies,
utilities master planning, rate and financial studies.
Peter Moore, P.E., LEED AP is president of Chen Moore and Associates will serve as principal-in-charge
for this project. He is ultimately responsible for all day to day operations of the firm. His experience
includes roadway design, stormwater design, sanitary collection improvements, pump station
rehabilitation, transportation engineering enhancements, water and reclaimed water consulting along
with all other phases of civil engineering design and neighborhood improvements.
Jose L. Acosta, P.E. will serve as the project manager and Engineer of Record of the project. Mr. Acosta
has over 12 years of experience and has served as the project manager and Engineer of Record on
many similar street and stormwater improvement projects for the Town of Miami Lakes and the City of
Miami Gardens. He has also served in a quality control management role with the City of Miami Beach
and the Village of Pinecrest. He has previously worked on projects throughout Miami-Dade County
utilizing drainage wells, outfalls, exfiltration trench and innovative sustainable stormwater designs for
new developments and for improvement of existing neighborhoods.
Oscar Bello, P.E. has over twelve years of experience and will be responsible for drainage design. He
has experience in planning, design, permitting, and construction management of roadway design,
stormwater design, water, wastewater, and municipal drainage projects in Florida including stormwater,
pump stations, outfalls, drainage well systems and exfiltration trench. Mr. Bello has been the engineer
of record for approximately 43,000 LF of ROW infrastructure improvements in Miami Beach.
Michael Buick, P.E. has over 11 years of experience and will be responsible for government permitting.
His experience includes planning, design and permitting of site infrastructure including site paving,
grading and drainage and site utility plans for land development projects. Mr. Buick is responsible
for designing stormwater management systems (paving, grading and drainage) and water and sewer
connections including design calculations, running flood routing models, drafting design drawings with
AutoCAD, coordinating design with other involved disciplines, calculating opinion of probable costs,
and writing Basis of Design Reports.
Meghan Wells, E.I., LEED AP has over two years of experience with roadway design and stormwater
improvements and will be responsible for utility coordination and design.
Marlon John has over nine years of experience with construction administration. He is involved in various
projects, which value over $40 million total in construction cost in Miami-Dade and Broward Counties.
These projects include the City of Miami Beach, Village of Pinecrest, Dania Beach Neighborhood
Improvement Projects, and Broadview Park Neighborhood Improvement Projects Bid Packages 2, 3 &
4.
)
Subconsultants
Nutting Engineers of Florida, Inc. provides a wide variety of engineering and materials testing services
~Nuning including threshold inspections. Geotechnical engineering services include
E Engineers investigations, analysis, and recommendations for site feasibility, foundations,
oIF1oddalncIE'labl;,hedl%7 embankments, pavements, retention structures, and other earthworks
YourProj<<t/JOurCommltmfnl .
proJects.
Stoner and Associates, Inc. has over 25 employees including four licensed professional surveyors and
mappers supervising six survey field crews. Stoner and Associates ~ON SSOCI'JtT"'S
. .. Ti ER&~ M/C ,Inc.
has developed a reputation as a professional, reliable company that SURVEYORS _ MAPPERS
provides accurate surveys, legal documentation and associated
services combined with dependable service for over a decade.
)
QA/QC Principal-in-Charge
Dr. Ben Chen, P.E., BCEE 1--
Peter Moore P.E., LEED AP
. Project Manager
Jose.Acosta, P.E.
Support Staff
)
Government Permitting
Michael Buick, P.E.
Drainage Design
Oscar Bello, P.E.
Utility Coordination and Design
Meghan Wells, E.!., LEED AP
Construction Engineering and Inspections
Marlon John
Geotechnical Engineering
Richard Wohlfarth, P.E. (Nutting Engineers of FL)
.Survey
James Stoner, PSM (Stoner & Associates)
'"Note: Miami-Dade County certifiedCBE firm.
Key Personnel I Function in the Company
Peter Moore P.E., LEED AP President
Dr. Ben Chen, P.E., BCEE ;~ Chairman
Jose Acosta, P.E. Senior Engineer, Branch Manager
Michael Buick, P.E. Senior Engineer
Oscar Bello, P.E. Senior Engineer
Meghan Wells, E.!., LEED AP Associate Engineer
Marlon John Engineering Inspector
Resumes
)
\
CHeRE
J &ASSOClATES
Ben H Chen, PhD, PE, BCEE
Chairman and Founder
Education
Bachelor of Science, Civil Engineering, National
Taiwan University, 1967
Master of Science, Sanitary Engineering,
National Taiwan University, 1969
Doctor of Philosophy, Civil Engineering, Virginia
Polytechnic Institute and State University, 1973
Registration
Professional Engineer, Florida, 31849, 1982
Professional Engineer, Virginia, OD8803, 1976
Professional Affiliations
. American Academy of Environmental
Engineers
. American Society of Civil Engineers
. American Water Works Association
. Florida Engineering Society
. National Society of Professional
Engineers
. Society of Military Engineers
. Water Environment Federation
\
,
Certifications
Diplomate, American Academy of Environmental
Engineers
Summary
Dr. Chen has over 44 years of civil and
environmental engineering experience. His
experience includes urban infrastructure
renewal, water and wastewater treatment
facilities design and construction management,
facilities planning, environmental studies,
utilities master planning, rate and financial
studies. He is the project director for a number
of projects including City Center and South
Pointe Right of Way Infrastructure Improvement
Projects for Miami Beach and principal-in-charge
for the Central Broward County and Broadview
Park Neighborhood Improvement Projects for
Broward County.
Project Experience
Miami Beach City Center Right of Way
Improvement Project. Chen Moore and
Associates is the prime consultant and was
responsible for providing surveying, planning,
geotechnical investigation, design, permitting,
preparation of construction documents, bid and
award and construction engineering and
inspection services for infrastructure
improvements within the public right of way
areas of the City Center neighborhood of Miami
Beach. The project encompasses approximately
24,000 LF of ROW infrastructure improvements
including water main replacements, sanitary
sewer upgrades, storm water drainage
improvements, paving & grading, streetscaping
enhancements, landscaping improvements,
lighting improvements, and roadway
reconstruction. This project also required
extensive coordination with the Public, adjacent
CRAs, historic districts and various regulatory
agencies.
As part of the proposed stormwater and
drainage services, extensive analysis was
conducted utilizing ICPR Modeling and GIS to
meet and/or exceed required stormwater Level
of Services standards. The proposed stormwater
design included the introduction of catch basins
and stormwater piping to effectively collect and
route the stormwater to 16 drainage gravity
wells with overflow outfall to Dade Canal. Water
quality treatment was an important
consideration and design factor of the system to
ensure that appropriate treatment was provided
prior to discharge to the gravity wells and
outfalls.
Village of Pinecrest SW 79th Avenue
Roadway Improvements. Chen Moore and
Associates provided professional engineering
services for the planning, design, and
permitting of the roadway improvements to SW
79th Avenue and SW 112th Street, including
the reconfiguration of SW 79th Avenue between
SW 110th Street and SW 112th Street, the
construction of a right turn lane extension from
SW 112th Street onto US-1, and the
construction of drainage improvements to
www.chenmoore.com
CHeRE
""'\ &ASSOCIATES
Jalleviate flooding concerns along the project
roadways. The reconfiguration of SW 79th
Avenue included the conversion of an existing
bidirectional roadway into a one-way roadway
and the construction of new sidewalk, curb and
gutter, and a parallel parking lane along the
west side of the roadway.
North Miami Beach NE 162nd Street
Improvements. Chen Moore and Associates
was selected as one of the consultants to
participate in the Proud Neighborhoods Capital
Improvement Project for the City of North
Miami Beach. To date, Chen Moore and
Associates has completed four right of way
improvements projects within the City. Each of
these areas has included roadway and drainage
improvements along with additional hardscape
and landscape elements. This project includes
right of way improvements to NE 162nd Street
between NE 17th Avenue and NE 18th Avenue
adjacent to Allen Park.
North Miami Beach NE 173rd Street Right
of Way Improvements. Chen Moore and
\Associates prepared right-of-way improvement
'plans for NE 173rd Street from West Dixie
Highway to NE 23rd Avenue within an existing
residential community. The design included
storm water improvements, formalizing of
on street parking, traffic/roadway modifications,
sidewalks with ADA grading considerations and
preserving and incorporating existing trees and
resident requests. This project also included
the design of a traffic circle to provide traffic
calming as well as streetscape beautification
with a stamped concrete apron and
landscaping. The design plans were permitted
via the City of North Miami Beach, Miami-Dade
County Department of Environmental Resources
Management and Miami-Dade County Public
Works Traffic Engineering Department.
Services included design, permitting, bidding
assistance and limited construction
administration services.
Village of Pinecrest Suncrest Dr & Moss
Ranch Rd Drainage Analysis. Chen Moore
and Associates worked with the Village of
Pinecrest to review existing conditions and
evaluate the existing stormwater Level of
Service (LOS) within the Suncrest Drive & Moss
Ranch Road area due to resident concerns.
CMA conducted an analysis of the area,
provided recommendations for drainage
improvements to meet Village LOS standards,
and provided full design, permitting and
construction document preparation services. As
part of the project, CMA also assisted the
Village in conducting public information
meetings, bidding the project, evaluating the
bids received and providing periodic site
observations during construction.
Miami Gardens NW 191st Street Drainage
Improvements. Chen Moore and Associates
(CMA) was asked by the City of Miami Gardens
to design the stormwater improvements for the
residential area from NW 9th Avenue to NW
10th Place and from NW 191st Street to NW
193rd Street. The design had a total
construction budget of over $400,000 per a
grant received by the City. CMA evaluated the
existing site conditions to strategically design
roadway, drainage and sidewalk improvements
to meet the most critical needs of the City and
maximize the value of their construction
budget. The design considered elements
related to the pedestrian paths and parallel
parking adjacent to Norland High School. The
project scope included government permitting,
bidding services and construction administration
to support the efforts of City staff.
Miami Gardens NW 19th Ave To NW 21st
Ave: from NW 191 Tr. To NW 26th St. Chen
Moore and Associates (CMA) was asked by the
City of Miami Gardens to design the stormwater
improvements for the residential area from NW
19th Avenue to NW 21st Avenue and from NW
191 Tr to NW 26th Street. The design had a
total construction budget of over $350,000 per
a grant received by the City. CMA evaluated the
existing site conditions to strategically design
roadway, drainage and sidewalk improvements
to meet the most critical needs of the City and
maximize the value of their construction
budget. The project scope included government
permitting, bidding services and construction
administration to support the efforts of City
staff.
www.chenmoore.com
CHeRE
., &ASSOCIATES
Peter M Moore, PE, LEED AP
President and CEO
Education
Bachelor of Science, Civil Engineering,
University of Florida, 1997
Master of Engineering, Civil Engineering,
University of Florida, 2004
Registration
Professional Engineer, Florida, 58709, 2002
Professional Affiliations
. American Society of Civil Engineers
. Florida Engineering Society
. Florida Stormwater Association
. National Society of Professional
Engineers
Certifications
Certified Stormwater Inspector
LEED Accredited Professional
)summary
As the President of the firm, Mr. Moore is
ultimately responsible for all day to day
operations of the firm. Mr. Moore has a broad
range of civil engineering experience including
stormwater management, roadway design,
sanitary collection improvements, pump station
rehabilitation, transportation engineering
enhancements, water and reclaimed water
consulting along with all other phases of civil
engineering design and neighborhood
improvements. Additionally, Mr. Moore serves
as the Assistant City Engineer for the City of
Coral Springs and is the spokesperson for the
City's Engineering Division. Finally, Mr. Moore
serves on the firm's QA/QC Committee ensuring
the consistency of the quality product
throughout the firm.
Project Experience
Miami Beach - South Pointe Phase
III/IV IV - ROW Improvement Project.
Chen Moore and Associates is the prime
consultant and is responsible for providing
surveying, planning, geotechnical investigation,
design, permitting, preparation of construction
documents, bid and award and construction
engineering and inspection services for
infrastructure improvements within the public
right of way areas of the South Pointe III/IV/V
neighborhood of Miami Beach. The project
encompasses approximately 19,000 LF of ROW
infrastructure improvements including water
main replacements, stormwater drainage
improvements, paving & grading, streetscaping
enhancements, landscaping improvements,
lighting improvements, and roadway
reconstruction. This project also required
extensive coordination with the public, adjacent
CRAs, historic districts and various regulatory
agencies.
As part of the proposed stormwater and
drainage services, extensive analysis was
conducted utilizing ICPR Modeling and GIS to
meet and/or exceed required stormwater Level
of Services standards. The proposed
stormwater design included the introduction of
catch basins and storm water piping to
effectively collect and route the stormwater to
sixteen drainage gravity wells and a stormwater
pump station with overflow outfall connections
to Biscayne Bay. Due to the environmental
sensitivity of Biscayne Bay design and
implementation of water quality treatment
measures was an important consideration and
design factor of the system prior to outfall to
the Bay and was closely coordinated with
regulatory agencies during the permitting
process.
Miami Lakes Lake Patricia Roadway &
Drainage Improvements. Chen Moore and
Associates is implementing drainage
improvements identified on the most recent
Town of Miami Lakes Storm water Master Plan
for approximately one square mile of an existing
residential neighborhood near Lake Patricia in
southern Miami Lakes near Ludlam Road.
Services include utility coordination, schematic
and final design phases, government
permitting, bidding assistance, construction
www.chenmoore.com
CH~RE
) &ASSOClATES
administration and statements of work
completion. The final design included
approximately 1,900 LF of exfiltration trench
and rehabilitation/upsizing of 6 existing outfalls.
CMA is also assisting Miami Lakes with the
acquisition of potential grant opportunities for
funding the construction of the proposed
improvements.
Miami Beach Sunset Islands 1 & 2. Chen
Moore and Associates designed stormwater,
water main, and roadway improvements for the
City of Miami Beach Sunset Islands 1 & 2
neighborhood. As part of the proposed
storm water and drainage services, extensive
analysis was conducted utilizing ICPR Modeling
and GIS to meet and/or exceed required
storm water Level of Service standards. The
proposed stormwater design included the
introduction of catch basins, exfiltration trench
and stormwater piping to effectively collect
storm water, provide water quality treatment
and route the stormwater to existing overflow
outfalls to Biscayne Bay. As part of the project,
an existing condition assessment of the existing
)outfalls was conducted and rehabilitation and
upsizing of the existing outfalls as required was
proposed. This stormwater project due to its
outfall to Biscayne Bay required extensive
permitting coordination with Miami-Dade
County DERM, South Florida Water Management
District and the US Army Corps of Engineers.
Village of Pinecrest SW 73rd Rd from SW
93rd Tr to SW 72 Ave. Chen Moore and
Associates assisted with drainage improvements
for SW 73rd Rd. Chen Moore and Associates
also developed an ICPR Model to determine
maximum flood elevation, provided a technical
memorandum and submitted final plans. Chen
Moore and Associates worked with the Village of
Pinecrest to review existing conditions and
evaluate the existing stormwater Level of
Service (LOS) within the SW 73rd Road
residential neighborhood from SW 93rd Terrace
to SW 72nd Avenue due to resident concerns.
CMA conducted an analysis of the area,
provided recommendations for drainage
improvements to meet Village LOS standards,
and provided full design, permitting and
construction document preparation services. As
part of the project, CMA also assisted the
Village in conducting public information
meetings and evaluating the bids received.
North Miami Beach NE 168th Street
Roadway Improvements. Chen Moore and
Associates provided consulting engineering
services for the NE 168 Street (between NE 18
Avenue and NE 19 Avenue) and NE 18 Avenue
(between NE 168 Street and NE 169 Street)
right of way improvements. The scope of the
project included addressing drainage concerns,
providing new curbing and street paving,
replacing/adding sidewalks, providing new
paved parking areas which were gravel, and
providing landscaping areas for future plantings
to be completed by the City.
Miami Gardens NW 38th Ct Drainage
Improvements. Chen Moore and Associates
designed stormwater improvements for the
residential area of NW 38th Avenue to NW 38th
Place & NW 208th Street to NW 209th Street.
The design had a total construction budget of
$175,000 per a grant received by the City. CMA
evaluated the existing site conditions to
strategically design roadway, drainage and
sidewalk improvements to meet the most
critical needs of the City and maximize the
value of their construction budget. The project
scope included government permitting, bidding
services and construction administration to
support the efforts of City staff.
Village of Pinecrest SW 64th Ct Drainage
Improvements. Chen Moore and Associates
worked with the Village of Pinecrest to review
existing conditions and evaluate the existing
stormwater Level of Service (LOS) within the
SW 64th Court residential cul-de-sac
neighborhood south of Kendall Drive due to
resident concerns. CMA conducted an analysis
of the area, provided recommendations for
drainage improvements to meet Village LOS
standards, and provided full design, permitting
and construction document preparation
services. As part of the project, CMA also
assisted the Village in conducting public
information meetings and evaluating the bids
received.
www.chenmoore.com
CHeRE
) &ASSOCIATES
Jose Luis Acosta, PE
Project Manager
Education
Masters of Business Administration, Master of
Business Administration, Auburn University,
2003
Bachelor of Science, Civil Engineering,
University of Miami, 1999
Bachelor of Science, Architectural Engineering,
University of Miami, 1999
l
I
I
Registration
Professional Engineer, Florida, 63827, 2004
Natl. Council of Examiners for Eng. & Surveying,
41987
)
Professional Affiliations
. American Society of Civil Engineers
. Cuban American Association of Civil
Engineers
. Florida Engineering Society
. National Society of Professional
Engineers
. Society of Military Engineers
. Urban Land Institute
Certifications
Stormwater Management Inspector
Summary
Jose Acosta, P. E. is a project manager and leads
Chen Moore and Associates' Miami office.
Previously, Mr. Acosta served as the director of
engineering, senior project manager and senior
engineer for a regional multi-disciplinary firm.
He served as both the director of engineering
and service manager for five south Florida
offices where he was responsible for a staff of
over 50 staff members.
Project Experience
Miami lakes lake Patricia Roadway &
Drainage Improvements. Chen Moore and
Associates is implementing drainage
improvements identified on the most recent
Town of Miami Lakes Stormwater Master Plan
for approximately one square mile of an existing
residential neighborhood near Lake Patricia in
southern Miami Lakes near Ludlam Road.
Services include utility coordination, schematic
and final design phases, government
permitting, bidding assistance, construction
administration and statements of work
completion. The final design included
approximately 1,900 LF of exfiltration trench
and rehabilitation/upsizing of 6 existing outfalls.
CMA is also assisting Miami Lakes with the
acquisition of potential grant opportunities for
funding the construction of the proposed
improvements.
Monterra Development Solano Avenue
Roadway Design and Construction
Administration. Chen Moore and Associates
designed an over half-mile long roadway that
connects Sheridan Street and University Drive,
mixed-use residential areas and the Town
Center component of the Monterra Development
in Cooper City. Solano Avenue was designed to
create a relationship between the mixed-use
residential, Town Center, pedestrian walkways,
parallel parking and green spaces to promote
walkability, social interaction and give the area
a sense of community. This required a variance
to reduce and relocate the required berm along
the property frontage to the roadways. Chen
Moore and Associates' services included
roadway, drainage, earthwork and utility
design; government permitting including PMUD
rezoning; conducting public bidding for the
Monterra Community Development District
(CDD); construction observation and closeout
services.
Miami Gardens NW 19th Ave To NW 21st
Ave: from NW 191 Tr. To NW 26th St. Chen
Moore and Associates (CMA) was asked by the
City of Miami Gardens to design the stormwater
improvements for the residential area from NW
19th Avenue to NW 21st Avenue and from NW
191 Tr to NW 26th Street. The design had a
total construction budget of over $350,000 per
a grant received by the City. CMA evaluated the
existing site conditions to strategically design
www.chenmoore.com
CHeRE
"'\ &ASSOCIATES
)roadway, drainage and sidewalk improvements
to meet the most critical needs of the City and
maximize the value of their construction
budget. The project scope included government
permitting, bidding services and construction
administration to support the efforts of City
staff.
l
,
I
I
Monterra Development University Drive
Improvements. The Chen Moore Team
designed a new right turn lane and bus bay
from University Drive (FDOT SR 817) into the
future entrance to the Town Center component
of the Monterra Development in Cooper City
(north of Sheridan Street). The project
required the design and construction of two - 9
foot box culverts (approximately 120 LF), the
demolition and relocation of +/- 2,000 LF of
water main from Davie Utilities and doubled the
width of +/- 2,000 LF of the existing Central
Broward Water Control District (CBWCD) canal
along University Drive. Coordination efforts
were conducted with the CBWCD, Town of Davie
Engineering, Town of Davie Fire Marshall, Town
of Davie Utilities, Cooper City Utilities, Broward
)County and the Florida Department of
Transportation. The project was completed
simultaneously with the University Drive Canal
Expansion Project. Chen Moore and Associates'
services included roadway, drainage, earthwork
and utility design; government permitting;
conducting public bidding for the Monterra
Community Development District (CDD);
construction observation and closeout services.
Village of Pinecrest SW 72nd Ave Drainage
Improvements. Chen Moore and Associates
worked with the Village of Pinecrest to review
existing conditions and evaluate the existing
storm water Level of Service (LOS) within the
SW 72nd Avenue residential neighborhood of the
Village due to resident concerns. CMA
conducted an analysis of the area, provided
recommendations for drainage improvements to
meet Village LOS standards, and provided full
design, permitting and construction document
preparation services. As part of the project,
CMA also assisted the Village in conducting
public information meetings, bidding the
project, evaluating the bids received and
periodic site observations during construction.
Village of Pinecrest SW 73rd Avenue
Stormwater Improvements. Chen Moore and
Associates worked with the Village of Pinecrest
to review existing conditions and evaluate the
existing storm water Level of Service (LOS)
within the SW 73rd Avenue from SW 93rd
Terrace to SW 96th Street residential
neighborhood of the Village due to resident
concerns. CMA conducted an analysis of the
area, provided recommendations for drainage
improvements to meet Village LOS standards,
and provided full design, permitting and
construction document preparation services. As
part of the project, CMA also assisted the
Village in conducting public information
meetings, bidding the project, evaluating the
bids received and periodic site observations
during construction.
Miami Gardens NW 191st Street Drainage
Improvements. Chen Moore and Associates
(CMA) was asked by the City of Miami Gardens
to design the stormwater improvements for the
residential area from NW 9th Avenue to NW
10th Place and from NW 191st Street to NW
193rd Street. The design had a total
construction budget of over $400,000 per a
grant received by the City. CMA evaluated the
existing site conditions to strategically design
roadway, drainage and sidewalk improvements
to meet the most critical needs of the City and
maximize the value of their construction
budget. The design considered elements
related to the pedestrian paths and parallel
parking adjacent to Norland High School. The
project scope included government permitting,
bidding services and construction administration
to support the efforts of City staff.
www.chenmoore.com
CHeRE
) &ASSOCIATES
Michael G Buick, PE
Senior Engineer
Education
Bachelor of Science, Biosystems Engineering,
University of Manitoba, 2000
Registration
Professional Engineer, Florida, 65894, 2007
Professional Affiliations
. American Society of Civil Engineers
. Environmental Coalition of Miami and the
Beaches
. Florida Engineering Society
. National Society of Professional
Engineers
. Urban Land Institute
Certifications
Certified Stormwater Management Inspector
Summary
)Mr. Buick has over 11 years of experience in
planning, design and permitting of stormwater
management systems (paving, grading and
drainage) and water and sewer connections for
several municipalities in South Florida.
Mr. Buick has coordinated storm water
management projects with numerous permit
agencies throughout South Florida including
FDEP, SFWMD, US ACOE, and various County
and City agencies and has extensive experience
working on projects in environmentally sensitive
areas including wetlands and coastal areas.
Project Experience
North Miami Beach NE 173rd Street Right
of Way Improvements. Chen Moore and
Associates prepared right-of-way improvement
plans for NE 173rd Street from West Dixie
Highway to NE 23rd Avenue within an existing
residential community. The design included
storm water improvements, formalizing of
onstreet parking, traffic/roadway modifications,
sidewalks with ADA grading considerations and
preserving and incorporating existing trees and
resident requests. This project also included
the design of a traffic circle to provide traffic
calming as well as streetscape beautification
with a stamped concrete apron and
landscaping. The design plans were permitted
via the City of North Miami Beach, Miami-Dade
County Department of Environmental Resources
Management and Miami-Dade County Public
Works Traffic Engineering Department.
Services included design, permitting, bidding
assistance and limited construction
administration services.
North Miami Beach NE 168th Street
Roadway Improvements. Chen Moore and
Associates provided consulting engineering
services for the NE 168 Street (between NE 18
Avenue and NE 19 Avenue) and NE 18 Avenue
(between NE 168 Street and NE 169 Street)
right of way improvements. The scope of the
project included addressing drainage concerns,
providing new curbing and street paving,
replacing/adding sidewalks, providing new
paved parking areas which were gravel, and
providing landscaping areas for future plantings
to be completed by the City.
Town of Miami Lakes Lake Patricia
Roadway & Drainage Improvements. Chen
Moore and Associates is implementing drainage
improvements identified on the most recent
Town of Miami Lakes Stormwater Master Plan
for approximately one square mile of an existing
residential neighborhood near Lake Patricia in
southern Miami Lakes near Ludlam Road.
Services include utility coordination, schematic
and final design phases, government
permitting, bidding assistance, construction
administration and statements of work
completion. The final design included
approximately 1,900 LF of exfiltration trench
and rehabilitation/upsizing of 6 existing outfalls.
CMA is also assisting Miami Lakes with the
acquisition of potential grant opportunities for
funding the construction of the proposed
improvements.
www.chenmoore.com
1
CHeRE
-~) &ASSOCIATES
Miami Beach Sunset Islands 1 & 2. Chen
Moore and Associates designed stormwater,
water main, and roadway improvements for the
City of Miami Beach Sunset Islands 1 & 2
neighborhood. As part of the proposed
stormwater and drainage services, extensive
analysis was conducted utilizing ICPR Modeling
and GIS to meet and/or exceed required
storm water Level of Service standards. The
proposed storm water design included the
introduction of catch basins, exfiltration trench
and stormwater piping to effectively collect
stormwater, provide water quality treatment
and route the stormwater to existing overflow
outfalls to Biscayne Bay. As part of the project,
an existing condition assessment of the existing
outfalls was conducted and rehabilitation and
upsizing of the existing outfalls as required was
proposed. This stormwater project due to its
outfall to Biscayne Bay required extensive
permitting coordination with Miami-Dade
County DERM, South Florida Water Management
District and the US Army Corps of Engineers.
Miami Gardens NW 191st Street Drainage
)ImprOvements. Chen Moore and Associates
(CMA) was asked by the City of Miami Gardens
to design the stormwater improvements for the
residential area from NW 9th Avenue to NW
10th Place and from NW 191st Street to NW
193rd Street. The design had a total
construction budget of over $400,000 per a
grant received by the City. CMA evaluated the
existing site conditions to strategically design
roadway, drainage and sidewalk improvements
to meet the most critical needs of the City and
maximize the value of their construction
budget. The design considered elements
related to the pedestrian paths and parallel
parking adjacent to Norland High School. The
project scope included government permitting,
bidding services and construction administration
to support the efforts of City staff.
Marathon MS4 Permitting. Chen Moore and
Associates provided consulting engineering
services for the submittal of the FDEP NPDES
MS4 annual report for the City of Marathon.
CMA also worked with the City to obtain the
renewal of the MS4 permitting for the current
cycle which included development of best
management practice goals, developing public
informational brochures, updating the City's
current storm water ordinance to reflect current
regulations and coordinating supplemental
information with the permitting agencies.
Monterra Development University Drive
Improvements. The Chen Moore Team
designed a new right turn lane and bus bay
from University Drive (FDOT SR 817) into the
future entrance to the Town Center component
of the Monterra Development in Cooper City
(north of Sheridan Street). The project
required the design and construction of two - 9
foot box culverts (approximately 120 LF), the
demolition and relocation of +/- 2,000 LF of
water main from Davie Utilities and doubled the
width of +/- 2,000 LF of the existing Central
Broward Water Control District (CBWCD) canal
along University Drive. Coordination efforts
were conducted with the CBWCD, Town of Davie
Engineering, Town of Davie Fire Marshall, Town
of Davie Utilities, Cooper City Utilities, Broward
County and the Florida Department of
Transportation. The project was completed
simultaneously with the University Drive Canal
Expansion Project. Chen Moore and Associates'
services included roadway, drainage, earthwork
and utility design; government permitting;
conducting public bidding for the Monterra
Community Development District (CDD);
construction observation and closeout services.
Village of Pinecrest Suncrest Dr & Moss
Ranch Rd Drainage Analysis. Chen Moore
and Associates worked with the Village of
Pinecrest to review existing conditions and
evaluate the existing stormwater Level of
Service (LOS) within the Suncrest Drive & Moss
Ranch Road area due to resident concerns.
CMA conducted an analysis of the area,
proVided recommendations for drainage
improvements to meet Village LOS standards,
and provided full design, permitting and
construction document preparation services. As
part of the project, CMA also assisted the
Village in conducting public information
meetings, bidding the project, evaluating the
bids received and providing periodic site
observations during construction.
www.chenmoore.com
CH~RE
"'j &ASSOClATIS
Oscar R. Bello, PE
Senior Engineer
Education
Bachelor of Science, Civil Engineering,
University of Central Florida, 1999
Registration
Professional Engineer, Florida, 61612, 2004
Professional Affiliations
. American Public Works Association
. American Society of Civil Engineers
. Environmental Coalition of Miami and the
Beaches
. Florida Engineering Society
. National Society of Professional
Engineers
Certifications
Nuclear Density Gauge Certification
Level I Survey Technician
)summary
Mr. Bello has more than 12 years of experience
in planning, design, permitting, and
construction management of water, wastewater,
and drainage municipal projects in Florida. Mr.
Bello has worked as a project manager and
project engineer for various projects in South
and Central Florida. He currently manages
municipal projects for the City of Miami Beach,
City of Dania Beach, Florida Keys Aqueduct
Authority and the City of Key West.
Project Experience
Miami Beach - South Pointe Phase
III/IV IV - ROW Improvement Project.
Chen Moore and Associates is the prime
consultant and is responsible for providing
surveying, planning, geotechnical investigation,
design, permitting, preparation of construction
documents, bid and award and construction
engineering and inspection services for
infrastructure improvements within the public
right of way areas of the South Pointe III/IV/V
neighborhood of Miami Beach. The project
encompasses approximately 19,000 LF of ROW
infrastructure improvements including water
main replacements, stormwater drainage
improvements, paving & grading, streetscaping
enhancements, landscaping improvements,
lighting improvements, and roadway
reconstruction. This project also required
extensive coordination with the public, adjacent
CRAs, historic districts and various regulatory
agencies.
As part of the proposed stormwater and
drainage services, extensive analysis was
conducted utilizing ICPR Modeling and GIS to
meet and/or exceed required stormwater Level
of Services standards. The proposed
stormwater design included the introduction of
catch basins and stormwater piping to
effectively collect and route the storm water to
sixteen drainage gravity wells and a stormwater
pump station with overflow outfall connections
to Biscayne Bay. Due to the environmental
sensitivity of Biscayne Bay design and
implementation of water quality treatment
measures was an important consideration and
design factor of the system prior to outfall to
the Bay and was closely coordinated with
regulatory agencies during the permitting
process.
Dania Beach - NW 1st Ave
WaterlStormwater. Chen Moore and
Associates was selected by the City of Dania
Beach for the NW 1st Ave project, which
includes replacing existing water main and
providing drainage improvements. The project
area is commercial, where many existing
utilities including gas main, sanitary sewer,
fiber-optic cables and other AT&T / Bellsouth
utilities are located. Therefore the placement of
the exfiltration trench and new water main was
a challenge in this small one way road.
Approximately 1400 linear feet of 12" water
main as well as 700 linear feet of exfiltration
trench have been designed and is currently
within the permitting phase.
www.chenmoore.com
CH~RE
) &ASSOCIATES
Miami Beach Sunset Islands 1 & 2. Chen
Moore and Associates designed stormwater,
water main, and roadway improvements for the
City of Miami Beach Sunset Islands 1 & 2
neighborhood. As part of the proposed
storm water and drainage services, extensive
analysis was conducted utilizing ICPR Modeling
and GIS to meet and/or exceed required
storm water Level of Service standards. The
proposed stormwater design included the
introduction of catch basins, exfiltration trench
and stormwater piping to effectively collect
stormwater, provide water quality treatment
and route the stormwater to existing overflow
outfalls to Biscayne Bay. As part of the project,
an existing condition assessment of the existing
outfalls was conducted and rehabilitation and
upsizing of the existing outfalls as required was
proposed. This stormwater project due to its
outfall to Biscayne Bay required extensive
permitting coordination with Miami-Dade
County DERM, South Florida Water Management
District and the US Army Corps of Engineers.
Miami-Dade County Pine Shores Drainage
)Improvement Project. Chen Moore &
Associates provided engineering design services
for the Pine Shores Drainage Improvement
Project. Chen Moore and Associates analyzed
the existing drainage systems and designed a
system to handle the 5 year - 1 day storm
event.
Miami Beach City Center Right of Way
Improvement Project. Chen Moore and
Associates is the prime consultant and was
responsible for providing surveying, planning,
geotechnical investigation, design, permitting,
preparation of construction documents, bid and
award and construction engineering and
inspection services for infrastructure
improvements within the public right of way
areas of the City Center neighborhood of Miami
Beach. The project encompasses approximately
24,000 LF of ROW infrastructure improvements
including water main replacements, sanitary
sewer upgrades, stormwater drainage
improvements, paving & grading, streetscaping
enhancements, landscaping improvements,
lighting improvements, and roadway
reconstruction. This project also required
extensive coordination with the Public, adjacent
CRAs, historic districts and various regulatory
agencies.
As part of the proposed stormwater and
drainage services, extensive analysis was
conducted utilizing ICPR Modeling and GIS to
meet and/or exceed required stormwater Level
of Services standards. The proposed stormwater
design included the introduction of catch basins
and storm water piping to effectively collect and
route the stormwater to 16 drainage gravity
wells with overflow outfall to Dade Canal. Water
quality treatment was an important
consideration and design factor of the system to
ensure that appropriate treatment was provided
prior to discharge to the gravity wells and
outfalls.
Village of Pinecrest SW 104th Street
Drainage Improvements. Chen Moore and
Associates was contracted by the Village of
Pinecrest to provide design and permitting
related services to address drainage concerns
along the north side of SW 104th Street at the
intersection with SW 77th Avenue. Proposed
drainage improvements included drainage
structures and exfiltration trench within the
public right of way to address the drainage
problem.
North Miami Beach NE 168th Street
Roadway Improvements. Chen Moore and
Associates provided consulting engineering
services for the NE 168 Street (between NE 18
Avenue and NE 19 Avenue) and NE 18 Avenue
(between NE 168 Street and NE 169 Street)
right of way improvements. The scope of the
project included addressing drainage concerns,
providing new curbing and street paving,
replacing/adding sidewalks, providing new
paved parking areas which were gravel, and
providing landscaping areas for future plantings
to be completed by the City.
www.chenmoore.com
CHeRE
) &ASSOCIATES
Meghan T Wells, EIT, LEED AP
Associate Engineer
Education
Bachelor of Science, Architectural Engineering,
University of Miami, 2009
Registration
Engineer In Training, Florida, 100206954, 200S
Professional Affiliations
. American Society of Civil Engineers
Certifications
LEED AP
Summary
Ms. Wells serves as an Associate Civil Engineer
for Chen Moore and Associates. She is a
graduate from the University of Miami where
she served as the President of the American
Society of Civil Engineers (ASCE) Student
Chapter. She became Chen Moore and
)Associates' first LEED Accredited Professional
while she was an intern in August of 200S. Her
experience includes roadway design,
stormwater modeling/design, GIS, permitting,
storm water master plans and coordination of
grant funding.
Project Experience
North Miami Beach NE 18th Ave Between
NE 167th & 168th Streets. Chen Moore and
Associates provided consulting engineering
services for the NE lSth Avenue between NE 167
th Street and NE 16Sth Street right of way
improvements. The scope of the project
included addressing drainage concerns,
providing new curbing and street paving,
replacing/adding sidewalks, providing new
paved parking areas which were gravel, and
providing landscaping areas for future plantings
to be completed by the City.
Miami Lakes Lake Patricia Roadway &
Drainage Improvements. Chen Moore and
Associates is implementing drainage
improvements identified on the most recent
Town of Miami Lakes Stormwater Master Plan
for approximately one square mile of an existing
residential neighborhood near Lake Patricia in
southern Miami Lakes near Ludlam Road.
Services include utility coordination, schematic
and final design phases, government
permitting, bidding assistance, construction
administration and statements of work
completion. The final design included
approximately 1,900 LF of exfiltration trench
and rehabilitation/upsizing of 6 existing outfalls.
CMA is also assisting Miami Lakes with the
acquisition of potential grant opportunities for
funding the construction of the proposed
improvements.
Miami Gardens NW 191st Street Drainage
Improvements. Chen Moore and Associates
(CMA) was asked by the City of Miami Gardens
to design the stormwater improvements for the
residential area from NW 9th Avenue to NW
10th Place and from NW 191st Street to NW
193rd Street. The design had a total
construction budget of over $400,000 per a
grant received by the City. CMA evaluated the
existing site conditions to strategically design
roadway, drainage and sidewalk improvements
to meet the most critical needs of the City and
maximize the value of their construction
budget. The design considered elements
related to the pedestrian paths and parallel
parking adjacent to Norland High School. The
project scope included government permitting,
bidding services and construction administration
to support the efforts of City staff.
Fort Lauderdale-Hollywood International
Airport Stormwater Master Plan Update.
Chen Moore and Associates worked on the
Stormwater Master Plan update for the Fort
Lauderdale-Hollywood International Airport.
This project included gathering all existing
information available from previous permits,
reports and studies and confirming their
accuracy for use in the existing conditions
model; preparing the existing conditions model
www.chenmoore.com
.. CHe.RE
) MSSOCIATES
with Interconnected Pond Routing Software;
and working with Broward County
Environmental Protection Division and the South
Florida Water Management District to confirm
that the modeled flood stages and peak
discharges match the levels in previously issued
permits. In addition, Chen Moore and Associates
prepared the "future conditions" model based
on the airport master plan; submitted for a
conceptual stormwater management permit
from Broward County EPD and SFWMD; and
worked with the consulting engineers for the
new south runway to submit for a construction
permit.
1
I
I
Hollywood Stormwater Master Plan
Update. Chen Moore and Associates reviewed
the analysis from the previous Stormwater
Master Plan for the City of Hollywood, which
was completed in 2004, and
prepared the update to the Plan with new
topographic and system data along with recent
drainage improvements projects. Chen Moore
and Associates also updated the ICPR
storm water model for the entire City limits to
)allow the City to assess the performance of
various alternatives for drainage system
improvements. Chen Moore and Associates used
the stormwater model to estimate whether the
system improvements would meet level-of-
service criteria for various storm events. During
the completion of this project, Chen Moore and
Associates was responsible for analyzing the
performance of various system improvement
alternatives, providing system improvement
recommendations with associated cost
considerations, and providing design guidelines
for new development.
Village of Pinecrest SW 72 Ct-SW 112 St to
SW 116 St Drainage Analysis. Chen Moore
and Associates worked with the Village of
Pinecrest to review existing conditions and
evaluate the existing stormwater Level of
Service (LOS) within the SW 72nd Court from
SW 112th Street to SW 116 Street residential
neighborhood due to resident concerns. CMA
conducted an analysis of the area including
review of existing topographic data, soils
information and drainage system conditions
reports of the existing system including existing
drainage structures and outfalls to the South
Florida Water Management District Canal. CMA
provided recommendations for improvements to
meet Village LOS standards
Marathon MS4 Permitting. Chen Moore and
Associates provided consulting engineering
services for the submittal of the FDEP NPDES
MS4 annual report for the City of Marathon.
CMA also worked with the City to obtain the
renewal of the MS4 permitting for the current
cycle which included development of best
management practice goals, developing public
informational brochures, updating the City's
current stormwater ordinance to reflect current
regulations and coordinating supplemental
information with the permitting agencies.
Monterra Development University Drive
Improvements. The Chen Moore Team
designed a new right turn lane and bus bay
from University Drive (FDOT SR 817) into the
future entrance to the Town Center component
of the Monterra Development in Cooper City
(north of Sheridan Street). The project
required the design and construction of two - 9
foot box culverts (approximately 120 LF), the
demolition and relocation of +/- 2,000 LF of
water main from Davie Utilities and doubled the
width of +/- 2,000 LF of the existing Central
Broward Water Control District (CBWCD) canal
along University Drive. Coordination efforts
were conducted with the CBWCD, Town of Davie
Engineering, Town of Davie Fire Marshall, Town
of Davie Utilities, Cooper City Utilities, Broward
County and the Florida Department of
Transportation. The project was completed
simultaneously with the University Drive Canal
Expansion Project. Chen Moore and Associates'
services included roadway, drainage, earthwork
and utility design; government permitting;
conducting publiC bidding for the Monterra
Community Development District (CDD);
construction observation and closeout services.
www.chenmoore.com
CHeRE
) &ASSOCIATES
Marlon D John
Engineering Inspector
Education
Master of Science, Construction Administration,
Florida International University, 2009
Bachelor of Arts, Business Administration, Park
University, 2002
Bachelor of Arts, Human Resources, Park
University, 2002
Registration
N/A
Professional Affiliations
N/A
Certifications
MOT Workzone Traffic Control: Intermediate
Level
Workzone Traffic Control.
Nuclear Density Gauge
Asphalt Paving Technician Level 2
\Asphalt Paving Technician Level 1
JEarthwork Construction Inspection Level 2
Earthwork Construction Inspection Level 1
Consultant CEI Project Manager Training
Radiation Safety Officer Training
Occupational Safety and Health Administration
Construction Safety and Health
Qualified Storm Water Management Inspector
Nuclear Density Gauge Certification (Troxler)
Summary
Mr. John has his Masters in Construction
Management from Florida International
University. As an Engineering Inspector for
Chen Moore and Associates, he is responsible
for testing and inspections on various types of
projects including neighborhood improvement,
water/wastewater and storm water projects
throughout Florida. He has been involved in
projects which total over $40 million in
construction value. These projects include
various projects for Miami Beach, Pinecrest,
North Miami Beach and the Monterra
Development as well as the Dania Beach
Neighborhood Improvement Projects,
Broadview Park Neighborhood Improvement
Project, the St. George East and Broadview Park
portions of the Central County Neighborhood
Improvement project.
Project Experience
Broward County St. George East. The
Central County Neighborhood Improvement
Project (CCNIP) is the second of three
neighborhood infrastructure improvements
projects carried out by Broward County in the
unincorporated areas. The project included
improvements to the drainage, water, sewer,
and roadway systems. Chen Moore and
Associates was selected to be the design
engineer for one third of the project sites,
including the Franklin Park, Washington Park,
St. George West and East neighborhood areas.
Chen Moore and Associates was also part of a
team of engineers that completed the basis of
design report (BODR), and served as the
project reviewer that made recommendations
resulting in substantial savings to the project's
budget. The St. George East Portion of the
project, which is located SE of Sunrise
Boulevard and NW 31st Avenue involved the
installation of water and sewer improvements,
along with paving and drainage improvements,
landscaping and entry features. The project was
completed on time and on budget and included
emergency change orders related to Hurricane
Clean-Up and approximately 2 miles of 20"
Water Main in FDOT ROW.
Miami Beach City Center Right of Way
Improvement Project. Chen Moore and
Associates is the prime consultant and was
responsible for providing surveying, planning,
geotechnical investigation, design, permitting,
preparation of construction documents, bid and
award and construction engineering and
inspection services for infrastructure
improvements within the public right of way
areas of the City Center neighborhood of Miami
Beach. The project encompasses approximately
24,000 LF of ROW infrastructure improvements
including water main replacements, sanitary
www.chenmoore.com
CH~RE
) &ASSOCIATES
sewer upgrades, storm water drainage
improvements, paving & grading, streetscaping
enhancements, landscaping improvements,
lighting improvements, and roadway
reconstruction. This project also required
extensive coordination with the Public, adjacent
CRAs, historic districts and various regulatory
agencies.
As part of the proposed storm water and
drainage services, extensive analysis was
conducted utilizing ICPR Modeling and GIS to
meet and/or exceed required storm water Level
of Services standards. The proposed stormwater
design included the introduction of catch basins
and stormwater piping to effectively collect and
route the stormwater to 16 drainage gravity
wells with overflow outfall to Dade Canal. Water
quality treatment was an important
consideration and design factor of the system to
ensure that appropriate treatment was provided
prior to discharge to the gravity wells and
outfalls.
Village of Pinecrest SW 79th Avenue
)ROadWay Improvements. Chen Moore and
Associates provided professional engineering
services for the planning, design, and
permitting of the roadway improvements to SW
79th Avenue and SW 112th Street, including
the reconfiguration of SW 79th Avenue between
SW 110th Street and SW 112th Street, the
construction of a right turn lane extension from
SW 112th Street onto US-1, and the
construction of drainage improvements to
alleviate flooding concerns along the project
roadways. The reconfiguration of SW 79th
Avenue included the conversion of an existing
bidirectional roadway into a one-way roadway
and the construction of new sidewalk, curb and
gutter, and a parallel parking lane along the
west side of the roadway.
Monterra Development Solano Avenue
Roadway Design and Construction
Administration. Chen Moore and Associates
designed an over half-mile long roadway that
connects Sheridan Street and University Drive,
mixed-use residential areas and the Town
Center component of the Monterra Development
in Cooper City. Solano Avenue was designed to
create a relationship between the mixed-use
residential, Town Center, pedestrian walkways,
parallel parking and green spaces to promote
walkability, social interaction and give the area
a sense of community. This required a variance
to reduce and relocate the required berm along
the property frontage to the roadways. Chen
Moore and Associates' services included
roadway, drainage, earthwork and utility
design; government permitting including PMUD
rezoning; conducting public bidding for the
Monterra Community Development District
(CDD); construction observation and closeout
services.
Monterra Development University Drive
Improvements. The Chen Moore Team
designed a new right turn lane and bus bay
from University Drive (FDOT SR 817) into the
future entrance to the Town Center component
of the Monterra Development in Cooper City
(north of Sheridan Street). The project
required the design and construction of two - 9
foot box culverts (approximately 120 LF), the
demolition and relocation of +/- 2,000 LF of
water main from Davie Utilities and doubled the
width of +/- 2,000 LF of the existing Central
Broward Water Control District (CBWCD) canal
along University Drive. Coordination efforts
were conducted with the CBWCD, Town of Davie
Engineering, Town of Davie Fire Marshall, Town
of Davie Utilities, Cooper City Utilities, Broward
County and the Florida Department of
Transportation. The project was completed
simultaneously with the University Drive Canal
Expansion Project. Chen Moore and Associates'
services included roadway, drainage, earthwork
and utility design; government permitting;
conducting public bidding for the Monterra
Community Development District (CDD);
construction observation and closeout services.
www.chenmoore.com
..... .
Richard C. Wohlfarth, P.E.
Principall Director of Engineering
)
FORMAL EDUCATION:
PROFESSIONAL EXPERIENCE:
University of Florida,
Gainesville, Florida
Bachelor of Science,
Civil engineering
PROFESSIONAL
REGISTRA TlONS:
Registered Engineer-
State or Florida .50853
Registered Building Inspltdor-
State or Florida BN ~580
smccl i1e528
ACI Level 1 ft91175
UBCI
....~OFESSIONAL
rFILlA TIONS:
Florida Engin8ering Society
"Past Chapter President
National Society of Professional
Engineers
REFERENCES:
Carmo Engineering
228 east Ocean Avenue
Lantana, Florida 33462
Mr. Dave Canna
561-58e-1111
Calvin Giordano & Assoc.
1800 Eller Drive, Ste. 600
Ft. Lauderdale, Florida 33316
Mr. Don 'Mndham
954-921-7781
Florida Keys Aqueduct Authority
1100 Kennedy Drive
" ~y West, Florida
I
:. Jim Reynolds
305-2M-245<4
Mr. 'M>hlfarth, p.e. is the Director of the Englne.ring Department which includes
professional and technical personnel. He also has overall responsibility for the Special
Inspection, Construction Materials Testing and Geotechnical Engineering Divisions
where he directs training, quality system review and personnel evaluations. His
responsibilities include report rltvlew, signing and sltlllng geotechnical enginttering,
structural inspection and laboratory tlsting reports for the company, providing contract
negotiltion and administration, budget estimating and projed management.
Mr. 'M>hlfarth has 22 years of experience (15 with NEF) in various aspects of
geotechnical engineering which Include dotennining feasibility of site development,
foundation design analysis and recommendations, providing engineering evaluation for
bridge and roadway construction, pavement design for roadways, roadway subgrade
stabilization by geotextiles and other means, design of shoring systems for utility
trenches and other deep excavations, dewatering methodology for trench and other
excavations and backfill procedures, setting up and monitoring pile load tests, and
providing value engineering for foundations.
Mr. VVohlfarth served as Project Engineer for the FOOT Broward Boulevardfl-95 f1yover
ramps and access improvements to the Tri-Rail systltm, which included three new
bridges. Additional project experience includes being the Project Engineer for the FOOT
roadway widening and Turnpike improvements at Tamiami Trail. This particular project
included three new bridges and over three miles of roadway improvements.
PROJECT EXPERIENCE:
. City of Hollywood: multiple ongoing projects, including Decorative Wall along
Boardwalk, Surf Road waterf sewer lines, bus shelters, Pubfic Works Facility
. City of Delray Beach: Atlantic Avenue improvements- 1-95 to NW 1 ih Avenue,
east of 1-95 north and south side of Atlantic Avenue; new piping, paver brick! pacer
sidewalks, decorative street lamps, landscaping, curb extensions to define where
parallel parking is along the street and widening the sidewalks. Converted the
signalized intersections at 12th, 10th and 8th Avenue to trombontt mast arms.
. Galloway Road ~ening- 4 mile span, Miami (FOOT)
. Various projects for the Broward County Board of Commissioners- Qualification
Based Contract (since 1988) and Miami Dad. County Board of Commissioners-
Qualification Based Contract (since 2000)- Environmental Assessments,
Gl!totechnical Exploration" Engineering, Material Testing, Structural Inspections
. Various K-12 Schools - Broward, Dade, Palm Beach, Martin, Indian River County
Districts- new classroom & administration buildings, athletic facUities, fields, related
concessions, additions, cafeterias, associated parking, roadways, sidewalks,
lighting, drainage evaluations, I.tnvlronmental assessments on potential sites.
. Miami Beach City Center R.O.W. Infrastructure Improvements: replacement of
40,00 I.f. of 3-12 inch diamoterwater mains, ra-milling of roadways, installation of
streetscapes inc. curbing, islands, lighting, parallel par1dng
r9!;~
\. CsTONER & ASSOCIATES, Inc.
"~ SURVEYORS - MAPPERS
I ..,~''o '<:"~-.
James D. Stoner, P.S.M.
President
Professional Profile
Mr. Stoner is a second generation land surveyor, with over 35
years of surveying experience in South Florida. He began his
surveying career at Williams, Hatfield, & Stoner, Inc., working
from the bottom all the way up to Vice President of the Surveying
Department.
Mr. Stoner founded Stoner & Associates, Inc. in 1988, based on
the philosophy that attention to detail and quality work would
create a successful firm. He has managed all aspects of the
firm's growth and development.
Mr. Stoner has supervised both small and large scale surveying projects. His firm has
successfully completed numerous roadway projects, while working directly with the
Department and its consultants.
Education
Land Surveying
Palm Beach Community College in 1979
Professional Registrations
State of Florida Professional Surveyor and Mapper
License Number LS4039
www.stonersurveyors.com
4341 S. W 62nd Avenue, Davie, FL 33314 T: (954) 585-0997 F: (954) 585-3927
)
Page 2 of 2
February 24, 2011
Professional Affiliations
Florida Surveying and Mapping Society
Florida Surveying and Mapping Society - Broward Chapter
American Congress on Surveying and Mapping
Leadership Broward
\
,
Page 2 of 2
)
1
I
,
4. Approach / Methodology
Chen Moore and Associates has over 25 years of experience in providing consulting civil engineering,
environmental engineering, landscape architecture and planning services for local public sector
clients throughout the state of Florida. Utilizing our extensive experience on similar street and drainage
projects with public sector clients in Miami-Dade County including projects for the Town of Miami
Lakes, the City of Miami Gardens, the City of North Miami Beach, the City of Miami Beach, the Village
of Pinecrest and Miami Dade County we have developed proven, efficient, cost effective methods to
deliver projects to our clients on time and within budget. We work as an extension of our clients as a
trusted advisor familiar with the technical aspects of a project, the regulatory/permitting requirements
and in consideration and communication with all stakeholders involved to ensure a successful project
on time and within budget. We ensure that our clients remain well informed throughout the process
with frequent communication and regular project updates and also that our staff is accessible to handle
any client needs that arise throughout the project. The following details the approach that CMA intends
to utilize for the successful completion of this project for the City of Sunny Isles Beach.
Project Scope
In the undertaking of any project, CMA understands the need to provide innovative and sustainable
solutions on time and within budget. Paramount in achieving a successful project on time and within
budget is to clearly define the scope and goals of the current project. In defining the scope of the
project, the following are some of the factors that will be considered:
. Project goals, timeline and budget
. Any unique characteristics and considerations (resident/hotline complaint logs, special
characteristics, etc.)
. Existing available information (available utility atlases, as-builts, operating reports, etc.)
. Additional information that will need to be obtained (survey, geotechnical studies, traffic studies,
etc.)
. Potential impacts of construction to: parking, bus routes, emergency access and vehicular flow;
pedestrian routes; community events; existing utilities; etc.
. Project stakeholders (affected residents, HOAs, public agencies, etc.)
. Regulatory authorities having jurisdiction and permitting agencies
. Project funding
. Construction requirements and limitations
At the outset of the project it is necessary to clearly define the scope of the project and the project
goals for all concerned parties to ensure the successful completion of the project.
Existing Site Assessment & Planning
In preparation of this proposal, CMA has already completed a number of existing site assessment tasks
for this project to become familiar with the project area. Additionally, these completed initial tasks
will result in time savings to the project and to the City of Sunny Isles Beach as we have procured the
following information and are ready to implement it into the proposed project:
-)
./
\
,
. Utility atlases and/or as-built information
CMA has requested a locate design ticket, is already aware of existing utilities within the project area
and has requested available utility atlases and/or as built information for the following utilities:
Water - Water service is provided by the City of North Miami Beach Utilities. Water mains are
12" in size and are approximately located on the North side of the project area.
Sewer - Sewer service is provided by Miami Dade Water and Sewer Department. Gravity sewer
mains 12" and 15" in size are located approximately at the centerline of the right-of-way.
AT&T - Existing AT&T utility lines exist within the project area along with utility cabinets located
on the north side of the project area.
FPL - Existing FPL underground utility lines exist within the project area along with utility
cabinets located on the north side of the project area.
Hotwire - Received confirmation that Hotwire has no conflicting utilities within the project
area.
TECO - Forwarded information to obtain existing utility information to coordinate proposed
improvements.
City of Sunny Isles Beach Stormwater - Existing stormwater inlets, pipes and outfalls exist
within the project area.
FOOT Stormwater - Existing stormwater inlets and pipes exist within the project area along the
connection of Collins Avenue with NE 174 Street.
Miami-Dade County Public Works - Existing traffic signals and control boxes exist within the
project area near the intersection of Collins Avenue with NE 174 Street.
City of Sunny Isles Beach Street Lighting - Existing street lighting and electrical wiring is located
within the project area.
. Existing available topographic information
CMA has utilized existing available UDAR data to review elevation data within the project area. A
preliminary assessment of the UDAR data
completed to identify low elevation points and
general runoff characteristics of the project area.
. Existing property/parcel information
CMA has utilized existing available GIS parcel and
County data to obtain existing property/parcel
data. Existing parcels are illustrated in above
preliminary GIS map.
. Soil data/geotechnical reports
CMA has coordinated with our geotechnical
subconsultants and County staff regarding general
subsurface conditions in the area including general
exfiltration rate values for preliminary evaluation
of proposed solutions.
~
~
..}~.
City of Sunny Isles Beach
NE 174 Street
Drainage Analysis
Figure 3 location Map
'"2"
. Aerial photograph
CMA has reviewed existing aerial photographs of the project area and noted: the proximity of available
outfall locations, existing outfall locations; existing above ground utilities to be coordinated; existing
area property developments; existing landscaping/trees that will need to be coordinated for the
implementation of the proposed project; existing traffic control of the project area; etc.
)
1
I
I
. Site specific field visit
CMA has conducted a site specific field visit of the project area. Example items noted during the field
visit performed and requiring coordination and review in project design and construction include:
Existing outfall located at South End of North Bay Drive
Existing stormwater structures and above ground utilities
Existing general development including multi-family residential buildings locations and
entrances
Existing low elevations holding standing water
Existing trees and landscaping
Existing Bus Transit routes
Existing speed bumps
Additional streetscape components to be considered along the corridor such as areas to address
current ADA code requirements; current pavement marking and signage code requirements;
pedestrian crosswalk requirements; implementation of traffic calming measures, etc.
. Additional information
Upon successful section of CMA by the City to provide the proposed services, the existing site assessment
and planning phase services of the project already conducted above may be supplemented by the
following available or specifically requested --:'iI
information:
Existing available survey information to be
reviewed and utilized in preparing a project
specific survey under this project.
Existing available soils/geotechnical reports
to be reviewed and utilized in preparing site
specific geotechnical testing under this project.
Existing environmental reports
Videotape of existing drainage system to
evaluate/assess existing condition
Local concerns/reports/general knowledge
regarding the proposed project (i.e., speak with City staff and/or residents and/or business
owners regarding reports of stormwater ponding/poor drainage conditions)
Available traffic studies, traffic counts, turning movements, accident reports, etc.
Available equipment/operation and maintenance reports and manuals (i.e., maintenance
schedules, etc.)
Proposed work/developments within the project area for coordination
Existing master plans, drainage/utility master plans, capital improvement plans, etc.
Existing permits, regulatory authorizations, permit conditions
The existing available data can be obtained from a variety of sources including the City itself, utility
owners, regulatory agencies, other government agencies and available published data.
In addition to reviewing existing available information, CMA will conduct a project-specific site visit to
identify features that may not have been identified in existing documentation and to review existing
conditions as they exist today. Based on a site visit and review of existing data, CMA can supplement
the existing data with only the required additional information, thereby providing an efficient and
cost effective existing conditions analysis of the project area. Additional information that is typically
requested includes additional survey data and site-specific geotechnical information, which would be
provided by our subconsultants.
,
Stormwater Modeling
It is often necessary to model existing and/or proposed conditions as part of a drainage project during
the design phase of the project. CMA is familiar with various modeling programs and software. Typical
software and programs implemented include:
AutoCAD Civil 3D
ICPR by Streamline Technologies
Storm CAD
Microsoft Excel
SWMM
Cascade
GIS analysis and tools
CMA first uses GIS analysis to create a three dimensional model of the existing ground surface within
the project area to identify the points of high elevation that create the drainage basins and the low-lying
areas where ponding could occur during rainfall events. StormCAD is used to estimate the flow conditions
within utility pipe networks and to size the utility components to handle the existing and/or future
flows. We can utilize the three dimensional model of the existing ground surface to calculate proper
cover for utility pipes and to create utility profiles based on slope and minimum invert requirements.
StormCAD is also used to calculate friction losses and size pipes for various flow scenarios. As such,
the plan and profiles for underground utilities can be designed and laid out with the assistance of our
modeling software. CMA also utilizes our software for an additional check of possible utility conflicts
and to determine where pipes must be offset.
Due to our extensive experience with projects similar to NE 174th Street, we are the best prepared firm
for this project. CMA has conducted a preliminary three dimensional modeling to analyze the NE 174th
Street project area. The project area has elevations ranging from 3.75' to 7.75' (NGVD 29). As shown in
Figure 1: Drainage Basin with UDAR
Data to the right, there are low-lying
areas susceptible to ponding during
rainfall events near the eastern side
of the complex curve and on the
western boundary of the project
area near North Bay Road. Based on
our preliminary review, CMA would
propose additional drainage
structures along with exfiltration
trench for water quality treatment
and an outfall to the existing canal
located south of the project area to
provide drainage improvements to
meet the City's Level of Service
standard in this area. This will require
coordination of a Class I Permit with
Miami-Dade PERA, an Environmental
Resource Permit (ERP) through South Florida Water Management District (SFWMD) and construction
along North Bay Road.
:' , II
' , ,
i /'
I. I.-Il1! 't '.' .~ ~
,a\, ",. l~\, .~
~P, '_ ._ I _ b 'i! l '" \ Jl >'.. I:^,", '
-
~
"-~-;.'
City of Sunny Isles Beach
NE 174 Street
Drainage Analysis
Figure 1: Drainage Basin with lIDAR Data
CK!:M
From our preliminary information, there is an existing outfall located along North Bay Road. The size
and condition of this outfall is unknown. Upon approval and further research, connection to the existing
outfall may be a possible design alternative if there is adequate available capacity within the existing
outfall system. The existing system including the outfall will need to be retrofitted with current design
standards including pollution retardant baffles and manatee grates. If further evaluation supports
utilizing the existing outfall system, a simplified regulatory permitting process can be expected resulting
in time savings to the project.
The installation of a gravity well was also reviewed during the preliminary analysis of proposed
solutions. Since the groundwater table is located at 2.00' (NGVD 29) and the lowest crown of road
elevation is at 4.75' (NGVD 29), limited head is available for discharge to a gravity well. Due to the
limited head condition and the higher cost for the construction of a gravity well, the alternate solutions
discussed above would be more cost effective and provide better value to the City, residents and other
stakeholders.
Upon approval and Notice to Proceed, we will finalize our design and submit for comments.
Roadway Design
CMA has extensive experience in the design of improvements to existing roadways. Our engineers are
well versed in the latest Miami-Dade County Traffic Engineering
Department (MDTED), Florida Department of Transportation
(FOOT) and Federal Highway Administration (FHWA) Design
Standards. We have recently successfully completed projects
with municipalities such as City of Miami Beach, Town of Miami
Lakes, Village of Pinecrest and City of Miami Gardens. From our
site observations, traffic calming features have been implemented
in the project area and additional traffic calming features may be
reviewed. Additionally it was noted during our site observations
that signing and striping components, ADA elements, pedestrian
crosswalk elements should be a component of the project to
meet current code requirements.
Project Design
Upon final review and analysis of existing conditions along with
initial modeling efforts, alternatives can be developed for review
with City of Sunny Isles Beach Staff and the Miami-Dade County
Permitting, Environment and Regulatory Affairs (PERA formerly
DERM) staff, as necessary, to achieve identified project goals. Based on initial analysis, proposed
alternatives will be presented to the City of Sunny Isles Beach along with an estimated project budget,
a time line to complete the project, and an achieved level-of-service goal. In addition, CMA will identify
the constraints of the proposed options. CMA will review the proposed alternatives with City staff,
answer any questions/concerns raised by the City, and receive City input to identify the best solution
to achieve the project goals. Once the best alternative is identified, CMA will develop proposed project
plans and bidding documents to construct the proposed project.
As part of the project design, CMA utilizes the latest available software to develop construction
documents. The Chen Moore team typically implements the latest versions of AutoCAD, AutoCAD Civil
3D, GIS and Microsoft Office programs to develop construction plans
and contract documents.
Having worked almost exclusively with public clients, the Chen Moore
team has a proven ability to accurately and expeditiously handle the
project delivery method of a public client, most of which are quite
similar, as most procurement is part of State statutes.
Another important part of the project design is the project cost
estimate. CMA uses two main methods for determining accurate unit
prices in order to arrive at an accurate cost estimate. The first method
is to consult with the construction management staff to determine
the current bidding climate. The second method is to consult with
other public sources, such as various municipal and county purchasing
websites, to follow patterns in the bidding of other similar projects.
)
)
Permitting
For any construction project, permits and required regulatory agency approvals from authorities having
jurisdiction are required. Since the approval of permit applications can define the schedule of a project,
CMA researches the needs and time frames for permits as far in advance as possible. Typical agencies
that may have jurisdiction on a proposed project within the City of Sunny Isles Beach for roadway and
drainage projects are listed below:
. Miami-Dade County Permitting, Environment and Regulatory Affairs (PERA formerly DERM)
. Miami-Dade County Public Works Department
. Miami-Dade County Traffic Engineering Department
. South Florida Water Management District
. Florida Department of Environmental Protection
. Florida Department of Transportation
. US Army Corps of Engineers
\
I
CMA is based in Miami-Dade, Palm Beach and Broward Counties and performs most of its work within
the Tri-County Area. As such, our familiarity with the regulatory agencies goes beyond the norm and
has grown to a successful, first-name-basis relationship.
Coordination
Coordination is another aspect of the project that will start at the very beginning. Through experience,
CMA has learned that a project can only be successful when open lines of communication exist between
the Engineer and the City, the public, various agencies, services and other consultants. Only by working
together can every stakeholder feel that their individual experience contributed to the successful
completion of the project.
Coordination with the City
When a project commences, the Chen Moore Project Manager establishes communication with the
City through regular phone and
email correspondence. This practice
is continued through the duration
of the project in order to ensure
a successful project. Our project
manager's have experience leading
project progress meetings, briefing
elected officials, participating in
construction meetings, meeting with
regulatory agencies and speaking at
public meetings involving citizens
and residents. CMA is also available
to attend City Commission meetings
upon request.
Construction Administration
The in-house construction
engineering inspectors at CMA are
backed up by years of experience
and the assistance of the engineers assigned to the project. The Chen Moore Team is very familiar with
the entire bidding process. Recent experience involved large construction contracts going to bid as part
of the Miami Beach Capital Improvement Projects and Broward County Neighborhood Improvement
Projects. However, in many instances, smaller contracts were processed for various projects in
municipalities throughout South Florida such as the City of Miami Gardens and the Village of Pinecrest.
At many different capacities, the Chen Moore team can administer all the bid process needs of the City
of Sunny Isles Beach.
(ii..--..'..
~'
"'~". ....,
"'b'#~'
.-.,'.'!I -.
City of Sunny Isles Beach
NE 174 Street
Drainage Analysis
Figure 2: Existing Drainage Structures
CH~M
Depending upon the specific needs of each project, the Chen Moore Team will make construction
inspectors available full-time, or available at critical junctures in the project process, for certification
and testing. It is essential during construction to have ongoing communication between the Client,
Contractor, Consultant and Community.
One important aspect of clarification is between the community and the client. This cannot be
overlooked. The construction phase is when most residents and/or business owners notice changes
occurring, along with disruptions. It is during this time that most residents start paying more attention
to the actual changes taking place. It is extremely important to keep an ongoing dialogue with the
residents to explain why certain aspects were designed as they were and what the overall benefits will
eventually be.
The Chen Moore team also realizes that even with the best planning, pre-investigation, design and
communication, changes can occur during construction. The most effective way of dealing with changes
is to try to anticipate them, provide alternative solutions quickly, which are acceptable to both Client
and Contractor, and negotiate with both entities to minimize additional costs. Often times, changes
can be made on site without the need for the change order process. CMA has built a reputation of
administering projects in a way which minimizes change orders and the costs associated with them.
r'" c_:':c_~_;:~.:-::;;;:-.:_ _~::.
~)
1
1
I
5. References
)
\
,
)
City of North Miami Beach, Florida
OFFICE OF CITY ENGINEER / CAPITAL IMPROVEMENT PROJECTS
Mark Spanioli, P.E.
Director of Engineering and Construction
City of Miami
Community Redevelopment Agency
49 NW 5th Street. Suite 100
Miami, Florida 33128
RE: General Engineering Services
North Miami Beach, FL
Design Start Date: January 200 I
Design Completion Date: On-going
To Whom It May Concern:
I would like to take this opportunity to express my gratitude for the exemplary services
provided by the Chen Moore and Associates team that contributed to the success of
various right-of-way projects in North Miami Beach, Florida.
\
Chen Moore and Associates has been working with the City of North Miami Beach sinee
2001. They have been responsible for the design and permitting of several civil
engineering projects throughout the City. The City of North Miami Beach can always
rely on Chen Moore and Associates for. their professionalism, honesty and commitment
to quality With any project they rcceiv,e.
With this said, I hereby recommend Chen Moore and Associates to provide engineering
services to City of Miami. They would be a great asset to your project.
Respectfully submitted,
b1'
City Engineer
17050 N.E. 19th Avenue. North Miami Beach, Florida 33162' Telephone: (305) 948-2967. Fax: (305) 957-3502
) ~ /\!\,li\/\/\IBEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachn.gov
CAPITAL IMPROVEMENT PROJECTS OFFICE
Tel: 305-673-7071, Fax: 305-673-7073
April 1 g, 2011
. HMarK Spariioli, P.E.
Director of Engineering and Construction
City of Miami
Community Redevelopment Agency
49 NW 5tb Street, Suite 100
Miami, Florida 33128
RE: South Pointe Phases 3, 4 & 5 Right-of-Way Improvement Project
Miami Beach, FL
Design Start Date: January 2004
Design Completion Date: June 2010
To Whom It May Concern:
I would like to take this opportunity to express our gratitude for the exemplary
engineering services provided by the Chen and Associates team that contributed to the
successful planning, design, permitting, bid, award and construction administration of
the South Pointe Phases 3, 4, & 5 Right-of-Way Improvement Project in Miami Beach,
Florida.
The Project Scope of Work includes improvements to the stormwater collection and
disposal system, including construction of twenty-one (21) gravity wells and pump
station, water distribution system, lighting, roadway reconstruction, roadway milling and
resurfacing, signage and pavement markings, landscaping, and irrigation.
The City of Miami Beach can always rely of Chen and Associates for their
professionalism, honesty and commitment to quality with any project they receive. With
this said, I hereby recommend Chen and Associates to provide engineering services to
City of Miami, they would be a great asset to your City project.
~UllY~.d.
~
Capital Project Coordinator
..... cc:.-- ..'FernandoVazquez;CIP Director- ___
Oscar Bello, Chen Moore and Associates
File
We are committed fa providing exc.el/ent public serAce and safety to 0/1 who live, wor.~, and pfay in our vibront, tropical, hislor;c communi/yo
)
----':J,
--=-=~.[ VILLAGE OF PINECREST
r----- ..'. ... -..-...----.. .__hn_....___..__.._..._...._ --.'-.C ----..-
I r, DEPARTMENT OF PUBLIC WORKS
rt
PINECREST
.1;::I__11::"."'A.
Daniel F. Moretti
PublIC Works D;({~c1or
April 26, 2011
Mr. Mark Spanioli, P.E.
Director of Engineering and Construction
City of Miami Community Redcvelopment Agency
49 NW 5'h Strect, Suite 100
Miami, Florida 33128
t
RE: Various Stormwater & Rights of Way Improvement Projects
Village of Pineerest, Florida
Design Start Date: November 2005
Design Completion Date: Ongoing
Mr. Spanioli:
I would like to take this oPPOltunity to express our gratitude for the exemplary services
provided by the Chen Moore and Associates team that contributed to the success of
various stolmwater and drainage improvements and sidewalk projects for the Village of
Pineerest.
Chen Moore and Associates has provided stonnwater and drainage improvement and
sidewalk improvement design services for the Village of Pinecrest since 2005. Chen
Moore and Associates has completed the design for 15 projects for the Village and
designed more than 2 y, miles of sidewalk expansion for the Village through Pineerest
and the City of Coral Gables. The Village of Pinecrest has always been able to rely on
Chen Moore and Associates with any project they have received.
Based on the work completed by Chen Moore and Associates for thc Village of Pinecrest,
[ hereby recommend Chen Moore and Associates to provide engineering and landscape
architecture serviecs to the City of Miami Community Redevelopment Agency. They
would be a great asset to any of your projects.
mitted,
10800 Red Road
Pinecrest, Florida 33156
1305.669.6916
1305.669.6919 I '. publicworks@pinecrest.lI.gov
6. Office Locations
Chen Moore and Associates has its corporate headquarters in Fort Lauderdale, with additional
) branch offices in Miami, West Palm Beach, Stuart and Gainesville. Our local office responsible for
RFQ# 11-11-02 to provide Civil Engineering Services to Design Street and Drainage Improvements for
the City of Sunny Isles Beach is:
1444 Biscayne Boulevard, Suite 204
Miami, FL 33132
Telephone: (786) 497-1500
Fax: (786) 497-2300
Point of Contact: Jose Acosta, P.E.
Our central locale enables on-staff professionals to develop innovative, yet practical designs based on
special insights into the problems and requirements of the communities of which they are a part. By
living and working in these communities, Chen Moore and Associates' engineering professionals are
able to work closely with their clients.
Our additional office locations are below.
Broward Office (Corporate headquarters)
500 West Cypress Creek Road, Suite 410
Fort Lauderdale, FL 33309
Telephone: (954) 730-0707
Fax: (954) 730-2030
Point of Contact: Peter Moore, P.E., LEED AP
Palm Beach Office
500 Australian Avenue South, Suite 710
West Palm Beach, FL 33401
Telephone: (561) 746-6900
Fax: (561) 746-8333
Point of Contact: James Barton, P.E., LEED AP
Gainesville Office
14 East University Ave, Suite 206
Gainesville, FL 32601
Telephone: (352) 374-1997
Fax: (352) 244-0875
Point of Contact: Jason Haeseler, P.E.
Stuart Office
510 SE Dixie Highway
Stuart, FL 34994
Telephone: (772) 919-7018
Fax: (772) 919-7019
Point of Contact: Cristobal Betancourt, RLA
1
I
I
'\
I
)
W",tPilmk.lchOtfM:.
FortlalMn1lIeOfic.
. .,.P"'- ---"
I
I
I
7. Contract Forms
)
')
,I '~1" L
SECTION 6
BID SUBMITTAL FOR:
ACKNOWLEDGEMENT OF ADDENDA
INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES
PART I:
LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION
WITH THIS BID
Addendum #1, Dated November 14,2011
Addendum #2, Dated
Addendum #3, Dated
Addendum #4, Dated
Addendum #5, Dated
Addendum #6, Dated
Addendum #7, Dated
Addendum #8, Dated
PART II:
o NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID
FIRM NAME:
DATE: December 1, 2011
eter Moore, P:E., LEED AP, President
AUTHORIZED SIGNATURE:
City of Sunny Isles Belch I Request for Qualifications No. 11-11-<12
I.
CHeRE
I-.,\~~()(I,\ I'"
IUD No.II-II-(}l Civil fl1gineering Sen'ices tn Design.'it n'l'I 1//Illl)millllge III/IJffJl'l'IIIl'l/ls
7-2
)
.' -, C' ., jo
BID SUBMITTAL FORM
Bid Title: CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE
IMPROVEMENTS
The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with
The City of Sunny Isles Beach in the form included in the Contract Documents to perform and furnish all
Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract
Time indicated in this Bid and in accordance with the other terms and conditions of the Contract
Documents.
The Proposers accepts all of the terms and conditions of the Advertisement or Request for Qualifications
and Instructions to Proposers, including without limitation those dealing with the disposition of Bid
Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The
Proposers agrees to sign and submit the Agreement with the Bonds and other documents required by the
Bidding Requirements within ten days after the date of the City's Notice of Award.
In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that:
The Proposer has familiarized himself/herself with the nature and extent of the
Contract Documents, Work, site, locality, and all local conditions and Law and
Regulations that in any manner may affect cost, progress, performance, or
furnishing of the Work.
The Proposer has given the City written notice of all conflicts, errors,
discrepancies that it has discovered in the Contract Documents and the written
resolution thereof by City is acceptable to the Proposer.
This Bid is genuine and not made in the interest of or on behalf of any
undisclosed person, firm or corporation and is not submitted in conformity with
any agreement or rules of any group, association, organization, or corporation;
the Proposer has not directly or indirectly induced or solicited any other
Proposers to submit a false or sham Bid; the Proposer has not solicited or
induced any person, firm or corporation to refrain from Bidding; and Proposer
has not sought by collusion to obtain for itself any advantage over any other
Proposers or over the City.
The City and the successful Proposer will establish completion times for each individual Work Item and
the successful Proposer agrees that the work will be completed within the time frames agreed upon and
stipulated in the individual Purchase Orders and/or Notice to Proceed.
City of Sunny Isles Beach I Request for Qualifications No. 11-11-02
CHORE
&ASSOCIATl'S
lifO No.lI-tl-lll Civil !:lIljil1eeril1lj Serl'ires to /Jesiljll Streetl1l1d /Jrailll1lje l/1/fJro\lrlnents
7.3
')
'11.'./'t~'.~... '\~
or
Firm Name: Chen Moore and Associates
1444 Biscavne Boulevard. Suite 204 Miami. FL 33132
Street Address:
.Same
Mailing Address (If different):
l
Telephone No. (786) 497-1500
Emall Address:jacosta@chenmoore.com
Fax No. (786) 497-2300
FEIN No. ~J...};f!.J])J.;~~~
[
I
I
.. "By signIng thIs
Signature:
Print Name:
Title:
THE EXECUTION OF THIS FORM CONSTlTVTES THE UNEQUIVOCAL OFFER OF PROPOSER TO
BE BOUND BY THE nRMS OF m PROPOSAL FAILURE TO SIGN THIS SOUaTAnON WHERE
INDICATED ABOVE BY AN AUTHORIZED ~'RESENTAT1VE SHAU RENDER THE PROPOSAL
NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN m SOLE DISCRE110N, ACCEPT ANY
PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCAUY BINDS THE
PROPOseR TO THE TERMS Of ITS OPPEft.
City of Sunny Isles Beach I Request for Qualifications No. 11-11-02
I
t.
I
CHeRE
",\~~()n\ II'~
/If() No.II-IHll CMI !:lJljil1eeril1lj Serl'irl's 10 DesiglJ Street (l1/(( IJrailJ(I!/f Im{JfIIl'fll1l'1/l.\
7-4
)
I
I
I
1
I
I
I
NON-COLLUSION AFFIDAVIT
City of Sunny Isles Beach
18070 Collins Avenue
Sunny I sles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
STATE OF FLORIDA
COUNTY OF Broward
The undersigned being first duly sworn as provided by law, deposes, and says:
This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be
relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid.
The undersigned is authorized to make this Affidavit on behalf of,
Chen Moore and Associates
(Name of Corporation, Partnership, Individual, etc.)
a. Corporation
(Type of Business)
Florida
(State)
, formed under the laws of
of which he is
President
(Sole Owner, Partner, President. elc.)
Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the
undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any
department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein.
This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph10.2.has not colluded, Conspired,
connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put In a sham Bid, or that such person;firm.or
corporation, shall refrain from Bidding, and has not in any manner. directly or indirectly,sought by ag'reemeht or collusion. or communication
or conference with any person, firm or corporation, to fix the prices of said Bid or Bids or any oiher proposers; a-Ad all statements cOntained Iii
the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph
1 r/'2' ~as Ireetly or indireell submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or
to any: ber or agent t eor.
Peter Moore, P.E., LEED AP President
NAME AFFIANT'S TITLE
,
TAKEN. SWORN AND SUBSCRIBED TO BEFORE ME this ~ day of
December
.2011
Personally Known X
or Produced Identification
Type of identification
(Affix seal here)
'f', ~.
NOl~/I.~
NO ARY P BLIC (name printed or typed)
NOTARYPunriC~ST^TE OF FLORIDA
(i""'''- r.ei~h Barron
{ j CoDloUsSlon#EE098032
""'.n......Explres: JUNE 06, 2015
BONDED nolU ATLA....i/C nO/il)lImco.,!Ne.
DeCEMBER 26, 2010
CHeRE
&A550CIATl:S
1 of 7
111'0 No. 11-11-01 Civil /.'l1lji/ll'erilllj SI'rl'irl's (n f)l'si!lll S( reel (//1(/ Draill(/ljl' IlI1prOl'ell1l'11ls
7-5
)
1
I
I
I
I
I
I
I
PUBLIC ENTITY CRIMES
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach. FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
PUBLIC ENTITY CRIMES
Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate
who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a
Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a
public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of
real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or
Consultant under a Contract with any public entity, and may not transact business with any public entity in excess
of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on
the convicted vendor list".
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER
OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
11.1. This sworn statement is submitted to City of Sunny Isles Beach
by Peter Moore, P.E.. LEED AP President
lpnnt IndiVIduals name and title]
for Chen Moore and Associates
[pnnt name of enllty submlttln9 sworn statement]
whose business address is:
1444 Biscayne Boulevard, Suite 204 Miami, FL 33132
and (if applicable) its Federal Employer Identification number (FEIN) is 59-2739866
(If the entity had no FEIN, include the Social Security Number of the individual signing this sworn
statement: .)
11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a
violation of any state or federal law by a person with respect to and directly related to the transaction of
business with any public entity or with an agency or political subdivision of any other state or with the
United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any
public entity or an agency or political subdivision of any other state of the United States and involving
antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation.
11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1 )(b), Florida Statutes, means a
finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any
federal or state trail court of record relating to charges brought by indictment or information after July 1,
1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere.
11.4. I understand that an "affiliate" as defined in Para. 287.133(1 )(a), Florida Statutes, means:
a.) predecessor or successor of a person convicted of a public entity crime; or
b.)
Any entity under the control of any natural person who is active in the management of the entity
and who has been convicted of a public entity crime. The term "affiliate" includes those officers,
directors, executors, partners, shareholders, employees, members, and agents who are active in
the management of an affiliate. The ownership by one person of shares constituting a controlling
interest in another person, or a pooling of equipment or income among persons when not for fair
2 of 7
DECEMBER 28, 2010
CHeRE
&ASSOCIATl'S
lira No.II-II-{)l CMI /.'nljineerinlj .len/ices 10 /Jesiljl1 Slree( and /Jrain(lljl' Improvements
7-6
)
market value under an arm's length agreement, shall be a prime facie case that one person
controls another person. A person who knowingly enters into a joint venture with a person who
has been convicted of a public entity crime in Florida during the preceding 36 months shall be
considered an affiliate.
11.5.
I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural
person or entity organized under the laws of any state or of the United States with the legal power to
enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or
services let by a public entity, or which otherwise transacts or applies to transact business with a public
entity. The term "persons" includes those officers, directors, executives, partners, shareholders,
employees, members, and agents who are active in management of any entity,
11.6.
Based on information and belief, the statement which I have marked below is true in relation to the entity
submitting this sworn statement. (Indicate which statement applies.)
x
Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, nor any
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
I
I
The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of
Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the
State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer
determined that it was not in the public interest to place the entity submitting this sworn statement on the
convicted vendor list. (Attach a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE
PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND,
THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO
A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA
STATUTES, FOR CATEGORY TWO OF" CHANGE IN THE INFORMATION CONTAINED IN THIS FORM.
By:
Sworn to and subscribed before me this ~ day of
December
, 20--1L, by
(AFFIX NOTARY STAMP HERE)
,NOTARY PUBLIC-STATE OF FLORIDA
..,'''''",_ 'Leigh Barron
.(W) Co~m1ss1on , EE098032
.,~$ ExpireS: JlJNE 06, 2015
BOlmID TBRU ATLANTlC80NDINGco,D(c'
.-- .' .' .
Signature: Nc;J!:Z Public --( ~Ioridal\.. r.:.r--
:::..... kbv \.I~(
Print or Type Commissioned Name
Personally Known x
OR Produced Identification
Type of Identification Produced
10/1998
3017
CHeRE
W\SSOCIJ\IES.
/If() NII./I-11-01 Cil'iI !:IH}illl'rril/lj Serl'il es I II /Jes;ljll SI rail/lid fJrailll/ljc 1/ll{lflll'C/IIeIIls
7-7
)
EQUAL OPPORTUNITY /
AFFIRMATIVE ACTION
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
EQUAL OPPORTUNITY I AFFIRMATIVE ACTION STATEMENT
The contractors and all subcontractors hereby agree to a commitment to the principles and
practices of equal opportunity in employment and to comply with the letter and spirit of
federal, state, and local laws and regulations prohibiting discrimination based on race,
color, religion, national region, sex, age, handicap, marital status, and political affiliation or
belief.
Signed:
Title: Peter Moor,
Firm: President
Address: 1444 Biscayne Boulevard, Suite 204 Miami, FL 33132
\
!
DecEMBER 28, 2010
CH_RE
MSSUCIAI~S
"
':.'
04 017
1110 NII.II-l/-Ii1 eMf /:ngineerinij SerJ'j(('S 1(1 {)('sigll SIIPI'll/nd {)minllij(' l/IIpfIJl1el1ll'IIIS
7-8
)
CONFLICT OF INTEREST
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
CONFLICT OF INTEREST STATEMENT
The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must
disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the
City of Sunny Isles Beach or its agencies.
STATE OF FLORIDA
COUNTY OF Broward
BEFORE ME, the undersigned authority, personally appeared Peter Moore, P.E., LEED AP
deposes, and states:
. who was duly sworn,
of
and principal office in
18.1. I am
rhf'n MoorE) ,'Inn AsSOr.iiltf'S
the President
with a local office in Miami
RFQ
18.2. The .above namedentltv Is submitting a 'tmt for the City of Sunny Isles Beach, .e.i& No. 11-11-02 described
as: Civil Entln..rrnl; Servl... 10 O"l&n 51.... and orarnagefhe Affiant has madEldiligent inquiry and provides the information contained in this
111'''''''''.&1''''1'''-40
Affidavit based upon his. own knowledge.
RFQ
18.3 The Affiant states that only one submittal for the above-etd is being submitted and that the above named entity has
no financial interest in other entities submitting -BTds for the same project.
RFQs
18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in
any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for
the above RFQ This statement restricts the discussion of pricing data until the completion of negotiations if necessary and
execution of the Contract for this project.
18.5 Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or otherwise ineligible from
participation in contract letting by any local, State, or Federal Agency.
18.6 Neither the entity, nor its affiliates, nor anyone associated with them have any potential conflict of interest due to any
other clients, contracts, or property interests for this project.
18.7 I certify that no member of the entity's ownership or management is presently applying for any employee position or
actively seeking an elected position with the City of Sunny Isles Beach.
18.81 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City
of Sunny Isles Beach.
Dated this
Oiet of interest is identified in the provision of services, I, on behalf of the above named entity, will
of Sunny Isles B
December , 2011
Peter Moore. P.L LEEDAP. President
Print or Type Name and Title
AFFIANT
Sworn to and ubscribed before me this ~ day of December , 2011
10 Pers nally Known x OR
LJ Prod cad Identification ; Type of )~enliflcation.
<tLr ~
NOTARY PUBLIC STATE OF FLORIDA N6TARYPUBI.tC.srATEO~FLOlUDA
""'''''''';. Leigh Barron
{W \ Coinmisslon # EEO?8032
\'flilliExpires:JUNE 06,2015
n~EDTmU ^Ti~~'TIC !lONDING ca, me.
DECEMBER 28. 2010
CHeRE
M$SOC1AI~S
50f7
IIrIJ No./I-1I-1I1 Cillil f.'lIljilleerillg Senire.\ to f)eSi!lIl.l'lft'ellll/tI /Jroilll/ljl' IllIflrtll'fl1ll'l1ls
7.9
l
)
DISPUTE DISCLOSURE
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
DISPUTE DISCLOSURE FORM
Answer the following questions by placing a "X" after "Yes" or "No". If you answer "Yes", please
explain in the space provided, or on a separate sheet attached to this form.
19.1. Has your Firm or any of its officers, received a reprimand of any nature or been suspended by the
Department of Professional Regulations or any other regulatory agency or professional associations within the last
five (5) years?
YES
NO x
19.2. Has your Firm, or any member of your firm, been declared in default, terminated or removed from a
contract or job related to the services your firm provides in the regular course of business within the last five (5)
years?
YES
NO x
19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests,
or litigation in the past five (5) years that is related to the services your firm provides in the regular course of
business?
\
I
YES NO x If yes, state the nature of the request for equitable adjustment, contract
claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the
monetary amounts of extended contract time involved.
I hereby certify that all statements made are true and agree and understand that any misstatement or
misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid
for the City of Sunny Isles Beach.
December 1, 2011
Date
Peter Moore, P.E., LEED AP, President
Print or Type Name and Title
DEcEMseR 29. 2010
CHeRE
MSSU(IAI~S
60f7
Ilro No. 11.11-111 Civil !:lIljillrerin!} ServiU's to /Jesiljll SireI'I lIlII! IJfllil1l1!}I' {IJlIJfllmlleJJls
7.10
)
ANTI-KICKBACK
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947.0606 Fax: (305) 949-3113
ANTI-KICKBACK AFFIDAVIT
STATE OF FLORIDA )
)
COUNTY OF Broward )
1
I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid
will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a
commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or
by an officer of the corporation.
By:
Peter Moore,P.E., LEED AP
Title:
President
The foregoing instrument
December , 20-.lL, by
of person], as President
Chen Moore and Associates
executed].
was acknowledged before me this 2:.-- day of
Peter Moore, P.E., LEED AP [name
[type of authority], for
[name of party on behalf of whom instrument was
NOTARY PUBLIC.STATE OF FLORIDA
~~,'Ulr',#,~ Leigh Barron
~ ~ j Co~mission II EE098032
....""...... Expires: JUNE 06, 2015
BONDED THRU ATLA.\iIC RONDING CO., INC.
(;
;j~,-:r_r"_, ~
Notary Public - State of Florida
\.e..:-~ (;l:,Vr'<;r'
Print or . ype Commissioned Name.
AFFIX NOTARY STAMP HERE:
Personally Known x OR Produced Identification
Type of Identification Produced
CU.:E
&ASSOClAlI'S
7 of 7
/lro ;\'o.//-II'(}l til'il J:lIljilll'l'rilllj Serl'irl's 10 f)1'Siljll .II/HI 1I11t! f)ra;II(1lje IIII{lflIl'I'lI/enIS
7.11