Loading...
HomeMy WebLinkAboutChen-Moore & Assoc. Request for Qualifications No. 11-11-02 Civil Engineering Services to Design Street and Drainage Improvements ~ lIlI S'ubmitted tl CH.RE &ASSOCIATES I \ ~Joo West Cypress Creek Road (Suite 410 it' Fort Lauderdale, H 33309 \ll'lNY ISl "r, ~J' /' ..<9~ ~ lIIMPORTANT, BID ENCLOSED" u c:l y ~. Bid No. 11-11-02 : ~ CIVIL ENGINEERING SERVICES TO DESIGN STREET AND , DRAINAGE IMPROVEMENTS OPENING DATE AND TIME: Friday, 12-02-11, at 10:00 AM Submitted by: Chen Moore and...AssOCI~i." ~'.J, r-rM ~~Oe.\ V (;y CEC 0 ? 20" "'''''''''''..I1;1IIIII'~\;~~F__ III rtted by: .HE " SSOCIA TES ORIGINAL '") CHeRE &ASSOCIATES e-"-~~r':--i::;:~t~~,i~:~~E:~'L)' I t , t DEe ~~ 2t l~ll~ I' l City of Sunny if!lss Hf)<),ch r._....~~!~C3 of' ih:) ell'! CIG'rk i _"_LV"__~-=---...~_",....,.,_.~ 1444 Biscayne Boulevard, Suite 204 Miami, FL 33132 Telephone: (786) 497-1500 Fax: (786) 497-2300 December 1, 2011 Sunny Isles Beach Government Center 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Subject: Request for Qualifications No. 11-11-02 Civil Engineering Services to Design Street and Drainage Improvements Dear Selection Committee: \ Chen Moore and Associates (CMA) is pleased to submit our Response to the Request for Proposals for Civil Engineering Services to Design Street and Drainage Improvements, This project will be managed from our Miami- Dade County office located at 1444 Biscayne Boulevard, Suite 204, Miami, FL 33132. Chen Moore and Associates is a civil/environmental engineering and landscape architecture consulting firm that is a Florida State certified MBE firm and a certified CBE in Miami-Dade County with offices in Miami, Ft, Lauderdale, West Palm Beach, Stuart and Gainesville, Founded in 1986, Chen Moore and Associates has grown to a staff of 28 full-time personnel who specialize in civil engineering, roadway design, drainage design, master planning, landscape architecture, GIS (Geographic Information Systems) and construction management including twelve licensed professional engineers and a professional landscape architect, CMA brings to the City a vast amount of municipal and governmental engineering experience in South Florida. We believe it is critical that the consultant for these services is knowledgeable about working in Miami-Dade County and has experience with municipal clients. We have effectively designed projects including drainage wells and exfiltration trench, with and without positive outfalls, in both the northern and southern parts of Miami-Dade County and in both existing residential and commercial areas. We know the formula that works and have the right experience for this project. With over 25 years of municipal engineering experience and over 14 in Miami-Dade County, Chen Moore and Associates has the local knowledge and expertise to meet your needs, Within the past five years, we have completed roadway and drainage improvement projects for a number of municipal clients in Miami-Dade, Broward and Monroe Counties including: City of North Miami Beach Village of Pinecrest Islamorada, Village of Islands City of Miami Beach City of Dania Beach City of Marathon Key Personnel The Chen Team feels that its organizational approach and relevant experience will be the most cost effective and time sensitive due to our focus on being responsive to all of the City's needs. The City's point of contact shall be Jose L. Acosta, P.E. (954,260.3987), who will serve as the project manager and Engineer of Record of the project. Mr. Acosta has over 12 years of experience and has served as the project manager and Engineer of Record on many similar projects for the Town of Miami Lakes and the City of Miami Gardens, He has also served in a quality control management role with the City of Miami Beach and the Village of Pinecrest. He has previously worked on projects throughout Miami-Dade County utilizing exfiltration trench, drainage wells, oufalls and innovative sustainable stormwater designs for new developments and for improvement of existing neighborhoods, City of Miami Gardens Town of Miami Lakes City of Key West City of Pompano Beach City of Fort Lauderdale City of Coral Springs Ilr{) NO./I-/I-{)) Civil J:l/lfil/eeril1lf Services 10 Uesilfl/ Slreel ill/d Until/illfe Il/1prrll1el/1eI/ts ) Mr. Acosta will lead a CMA team of talented professionals who will utilize their previous experience on similar projects of similar size and budget to execute a successful result for the City of Sunny Isles Beach. Together these professional engineers can address the most important concerns for this project: appropriate drainage; grading for an urban corridor; maintaining the pedestrian experience; protecting existing landscape features, especially canopy trees; and addressing the concerns of business owners and residents. They include the following: Oscar Bello, P.E. (over twelve years of experience - drainage design), Michael Buick, P.E. (over 11 years of experience _ government permitting), Meghan Wells, E.I., LEED AP (over two years of experience - utility coordination and design), and Marlon John (over nine years of experience - construction administration). This team has recent and current experience working on these types of projects in Miami Beach, Miami Gardens, Pinecrest, Miami Lakes and North Miami Beach. In addition, Dr. Ben Chen, P.E., BCEEis always available to attend meetings and to participate in project presentations to stakeholder groups, advisory boards, and elected officials. Together, Dr. Chen and I have over 4S years of combined experience, including continuing services contracts. We pride ourselves on the kind of service that can only be found in smaller organizations because every client is important to us. Subconsultants Nutting Engineers of Florida, Inc. provides a wide variety of engineering and materials testing services including threshold Inspections. Geotechnical engineering services include investigations, analysis, and recommendations for site feasibility, foundations, embankments, pavements, retention structures, and other earthworks projects. Stoner and Associates, Inc. has over 25 employees including four licensed professional surveyors and mappers supervising six survey field crews. Stoner and Associates has developed a reputation as a professional, reliable company that provides accurate surveys, legal documentation and associated services combined with dependable service for over a decade. Chen Moore and Associates has been involved in all stages of a project, including planning, design, permitting, grant preparation and administration, contract administration, construction management and public relations. We have extensive experience working on roadway and drainage projects in heavily utilized as well as residential rights-of-way and the expertise to effectively develop construction documents that minimize disruptions to the public while ensuring a successful project within the budget. Our ability to utilize GIS to assist in the data collection along with our surveyors allows us to be more cost effective and, more importantly, allows us to find project design solutions sooner. We understand that the goal of the project is to create practical and effective designs, addressing the stormwater requirements ofthe project in the most cost effective manner, while giving top level service to the City of Sunny Isles Beach and its residents. Through our extensive experience, we also understand the importance of communication with the residents before, during and after construction to make the construction process as seamless as possible for all parties involved. Because we are locally based and have been in Miami-Dade County for over 14 years, we are very familiar with the applicable regulatory agencies and have well-developed working relationships with all permitting agencies, including Miami-Dade County DERM, South Florida Water Management District, Miami-Dade County Public Works, Florida DEP and the Florida Department of Transportation. Should you have any questions, please do not hesitate to contact me at (786) 497-1500 or pmoore@chenmoore.com. Respectfully submitted, CHeRE M5SOC'AIIiS !IrQ No.II-/HJ) (Wi! J:11!Jilll'eril1lj Servires II! IJrsi!lll.\lreetllllcl IJrail1l1YI' IIIl/lrol'I'IIIl'lIt.1 2 Table of Contents ) Section Title Page Number 1 Cover Letter. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 Table of Contents. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 Company Information....................... ............ .1-1 . Fictitious Name Certificate. . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3 . Corporate Charter. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-4 . Insurance Certificate. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-5 . Miami-Dade County CBE Certificate.................... .1-6 . State of Florida MBE Certificate....................... .1-7 Qualifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1 . Schedule.......................................... .2-4 . Project Experience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-5 Staffing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-1 . Resumes........................................... .3-4 Approach / Methodology. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-1 References. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-1 Office Locations........................................ .6-1 Contract Forms. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-1 2 3 4 5 6 7 \ J ) 1. Company Information Name of Agency/Company (including any "Doing Business As" names) The firm's full legal name is Chen and Associates Consulting Engineers, Inc. Our "Doing Business As" firm name is Chen Moore and Associates. Prior to January 1, 2011, the firm was known as Chen and Associates. A copy of our fictitious name certificate is on page 1-3. Company Locations Miami-Dade Office 1444 Biscayne Boulevard, Suite 204 Miami, FL 33132 Telephone: (786) 497-1500 Fax: (786) 497-2300 Contact Person: Jose Acosta, P.E. Note: The Miami-Dade office will be the responsible office for RFQ# 11-11-02, Civil Engineering Services to Design Street and Drainage Improvements for the City of Sunny Isles Beach. Broward Office 500 West Cypress Creek Road, Suite 410 Fort Lauderdale, FL 33309 Telephone: (954) 730-0707 Fax: (954) 730-2030 Palm Beach Office 500 Australian Avenue South, Suite 710 West Palm Beach, FL 33401 Telephone: (561) 746-6900 Fax: (561) 746-8333 \ ; Gainesville Office 14 East University Ave, Suite 206 Gainesville, FL 32601 Telephone: (352) 374-1997 Fax: (352) 244-0875 Stuart Office 510 SE Dixie Highway Stuart, FL 34994 Telephone: (772) 919-7018 Fax: (772) 919-7019 Subconsultants Nutting Engineers of Florida Inc. 2051 NW 112th Avenue Suite 126 Miami, FL 33172 Stoner and Associates, Inc. 4341 SW 62nd Avenue Davie, FL 33314 Internet Web Site Address (if any) www.chenmoore.com ~) \ I Details of Entity Business Structure (Corporation, Partnership, LLC) Chen Moore and Associates Florida corporation. A copy of our corporate charter is located on page 1-4. A copy of our fictitious name certificate is on page 1-3. Date Founded November 7, 1986. Home office address, telephone number, and local address and phone number Home Office Address 500 West Cypress Creek Road, Suite 410 Fort Lauderdale, FL 33309 Telephone: (954) 730-0707 Local Address 1444 Biscayne Boulevard, Suite 204 Miami, FL 33132 Telephone: (786) 497-1500 List of any outstanding litigation that would threaten the viability of the firm or the performance of this contract Neither Chen Moore and Associates nor its parent or subsidiaries, predecessor organization(s), nor any wholly owned subsidiary has had any claims, arbitrations, administrative hearings, or lawsuits brought by or against the firm during the last five years. Proof of insurance Please see page 1-5. Indication of how long it would take to implement service after authorized to begin Key personnel are currently ready to and available to begin work on this project and will work with the City's schedule to complete the design, permitting and bid documents within the City's schedule. Please refer to the schedule included in Section 2, Qualifications, for a detailed outline of our proposed time line. ) APPLICATION FOR REGISTRATION OF FICTITIOUS NAME REGISTRA TION# G11 000014388 Fictitious Name to be Registered: CHEN MOORE AND ASSOCIATES Mailing Address of Business: 500 W. CYPRESS CREEK ROAD SUITE 410 FT. LAUDERDALE, FL 33309 Florida County of Principal Place of Business: BROWARD FEI Number: FILED Feb 07,2011 Secretary of State Owner(s) of Fictitious Name: CHEN AND ASSOCIATES CONSULTING ENGINEERS, INC. 500 W. CYPRESS CREEK ROAD, #410 FT. LAUDERDALE, FL 33309 US Florida Document Number: J41454 FEI Number: 59-2739866 \ , I the undersigned, being an owner in the above fictitious name, certify that the information indicated on this form is true and accurate. I further certify that the fictitious name to be registered has been advertised at least once in a newspaper as defined in Chapter 50, Florida Statutes, in the county where the principal place of business is located. I understand that the electronic signature below shall have the same legal effect as if made under oath and I am aware that false information submitted in a document to the Department of State constitutes a third degree felony as provided for in s. 817.155, Florida Statutes. PETER MOORE Electronic Signature(s) 02107/2011 Date Certificate of Status Requested ( ) Certified Copy Requested ( ) 1 State of Florida Department of State I certify from the records of this office that CHEN AND ASSOCIATES CONSULTING ENGINEERS, INC. is a corporation organized under the laws of the State of Florida, filed on November 7,1986. The document number of this corporation is J41454. I further celiify that said corporation has paid all fees due this office through December 31, 2011, that its most recent annual report was filed on January 14, 2011, and its status is active. I further certify that said corporation has not filed Aliicles of Dissolution. Givel/ ul/der my hal/d amI the Great Seal of Florida, at Tallahassee, the Capital, this the Fifteel/th day of Jal/uary, 2011 ~'U6 Secretary of State Authentication 10: 800191408568-0 11511-J41454 To authenticate this certificatc,visit the following site, enter this 10, and then follow the instructions displayed. h ttps:/ / efile.sun biz.orglcerta u th ver.h tm I I .1 ) MIAMI.. ~iiiI' Small Business Development 111 NW 1 st Slreet . 19th Floor Miami, Florida 33128-1906 T 305-375-3111 F 305-375-3160 Carlos Alvarez, Mayor miamidade.gov January 12, 2011 CERT. NO: 4424 APPROVAL DATE(s): 02/28/2011 - CBE Tier 2 EXPIRATION DATE: 02129/2012 Ms. Peter Moore CHEN AND ASSOCIATES CONSULTING ENGINEERS, INC. 420 Lincoln Rd, Suite 444 Miami Beach, FL 33139-0000 Dear Ms. Moore: The Department of Small Business Development (SBD) has completed the review of your application and attachments submitted for certification. Your firm Is officially certified as a Community Business Enterprise (CBE) in the categories listed below. This certification is valid for twelve (12) months, which will expire on February 29, 2012. This certification affords your company the opportunity to benefit from participation in county contracts with small business measures. Please note the trade categories listed below. These are the only sheltered market areas that your company Is eligible to bid or participate In under your current certification. If any Changes occur within your company during the certification period (such as ownership, address, telephone number, trade category, licensing, technical certification, bonding capacity, or if the business ceases to exist) you are required to notify this department within 30 days in writing. It is of critical importance that current information regarding your company be maintained. All inquiries or changes related to this certification should be directed to Coralee Walkine-Taylor at coralee@miamidade.gov in the Certification Unit. An application for re-certification must be submitted and forwarded to this office four (4) weeks prior to the referenced expiration date. Should your firm fail to re-certify, or lose its certification for any reason, the ability to work on contracts with measures will be affected. Thank you for doing business with Miami-Dade County. \ , CATEGORIES: (Your firm may bid or participate on contracts only under these categories) HIGHWAY SYSTEMS.SITE DEVELOP/PARKING LOT DESIGN (CSE) HIGHWAY SYSTEMS.HIGHWAY DESIGN (CSE) HIGHWAY SYSTEMS-TRAFFIC CALMING (CSE) W & S SEWER SYS.WATER Dlin & SANITARY SEWAGE COLL (CSE) W & S SEWER SYS.MAJOR WATER & SEWER PUMPING FACILI (CSE) W & S SEWER SYS.W & S SEWAGE TREATMENT PLANT (CSE) ENVIRONMENTAL ENG-STORMWATER DRAINAGE DESIGN SERV (CSE) GENERAL CIVIL ENGINEERING (CSE) ENGINEERING CONSTRUCTION MANAGEMENT (CSE) VALUE ANAL YSISlLIFE.CYCLE COSTING-WATER & SANITARY (CSE) VALUE ANAL YSISlLlFE.CYCLE COSTING.GEN CIVIL ENG (CSE) HIGHWAY SYSTEMS.SIGNING, PAVEMENT MARKING, CHANNEL (CSE) ENGINEERING SERVICES (CSE) ."" I. . . // t ~ ! ) . ')' "" { ,- \ ..." , .'--l't".." i)'(l/ ~ (':, (~f~f Il-;.' L-/ '- ( (' ~ L (.' U (' L-- f . I, -. I () -..1 .oJ DBDROO20 v2010t108 .j ') \ , , MIAMI.. mmiiil Small Business Development 111 NW 1 Street, 19'h Floor Miami, Florida 33128 T 305-375-3111 F 305-375-3160 miamidade.gov April 19, 2011 CERT. NO: 14476 APPROVAL DATE(s): 0411812011 - CBE Tier 2 EXPIRATION DATE: 0413012012 Mr. Richard Wohlfarth NUTTING ENGINEERS OF FLORIOA INC 1310 Neptune Dr B~ton Beach, FL 33426 Dear Mr. Wohlfarth: The Departrrent of Small Business Dewlopment (SBD) has completed the re\iew of ~r application and attachrrents submitted for certification. Your firm is officially certified as a CorrmJnity Business Enterprise (CBE) in the categories listed below. This certification is ..alid for twell.e (12) rrooths, lMlich v.ill e>q:lire on April 30, 2012. This certification affords \OUr corrpany the opportunity to benefit from participation in county contracts v.ith small business measures. Please note the trade categori.es listed below. These are the only sheltered marl<et areas that lOur companyis eligible to bid or participate in under lOur current certification. If any changes occur v.ithin ~r corrpany during the certification period (such as O'M1ership, address, telephone number, trade category, licensing, technical certification, bonding capacity, or if the business ceases to ellist) ~ are required to notify this department v.ithin 30 day.;; in writing. It is of critical irrportance that currentinformation regarding ~r company be maintained. All inquiries or changes related to this certification should be directed to Adriana Coba at cobaa@mianidade.govin the Certification Unit. An application for rG-certification must be subrritted and forwarded to this office four (4) 'Mle~ prior to the referenced e>q:liration date. Should ~r firm fail to rG-certify, or lose its certification for any reason, the ability to oorkon contracts v.ith measures v.ill be affected. Thank ~ for doing business v.ith Miani-Dade County. ) Sinc~ Panel sley Direct CATEGORIES: (Your firm may bid or participate on contracts only under these categories) DRIlLING SUBSURFACE INVESTIGATIONS & SEISMOGRAPHIC (CBE) GEOTECHNICAl & MATERIALS ENGINEERING SERVICES (CBE) CONCRETE AND ASPHAlT TESTING SERVICES (CSE) ENVIRONMENTAl ENG-CONTAMINATION ASSESS & MONITOR (CSE) ENGINEERING SERVICES (CSE) DBDROO2O'<20101106 ) 2. Qualifications Chen Moore and Associates (CMA) is a multi-discipline consulting firm that is a Florida State MBE certified and locally certified CBE firm located in Miami, Fort Lauderdale, West Palm Beach, Stuart and Gainesville, Florida. Chen Moore and Associates, founded in 1986, has grown to a staff of 28 full- time personnel. The firm has successfully completed a wide range of projects involving the planning, design and construction in a multitude of disciplines including: . Civil Engineering including drainage, roadway, water distribution/supply/treatment, wastewater collection/transmission/treatment/disposal, pump station design and rehabilitation, utility coordination and stormwater pollution prevention . Environmental Engineering . Infrastructure Master Planning . Site Master Planning . Landscape architecture and urban design including hardscape design . Reuse and Irrigation Design . Program Management . GIS analysis and mapping . Grant and loan services . Bidding and Construction Administration Services . Construction management, supervision, inspection and administration. The firm includes 12 licensed professional engineers, seven LEED Accredited Professionals and a licensed landscape architect. The firm is celebrating its 25th anniversary in business serving South Florida and our Miami Office is celebrating its 14th anniversary in Miami-Dade County. \ CMA's Unique Qualifications for this project . The Chen Moore Team is prepared and available to expedite the project for the City of Sunny Isles beach upon receipt of a Notice to Proceed. Tasks already completed and information aleady obtained include: Site visit has been conducted Analysis of existing aerials and UDAR data Identifying, contacting and receipt of as-built/altas' for existing utility information Performed preliminary GIS analysis and stormwater model Coordination with out geotechnical investigation team members to obtain general subsurface conditions to conduct a preliminary evaluation of possible solutions Identification of additional items to be considered in the development of the proposed project solutio. E;.:;__ c..".--............ current codes requirements regarding ADA gradin ;~ . ~ driveway access connections to the project area/coo 'sf . "._ ' Preliminary discussions with regulatory agencies :' "8l: ..;~ concerning the possible solutions to identify both time saving and cost saving opportunities for the City in proposing a solution. . The Chen Moore Team has worked together on numerous projects with very similar scope and budget for several municipalities successfully. =~::~ .,.,. ."0 ." .." :::.: .,.. ~~:). ~ (I ,~ CitvofSunrryl$.lesBeach NE 174Slfeel DraioagllAnalysis r.og\l'e2: E.isl:ingDainageStrudu'll'S ~ ) .....,-."'" . The staff and subconsultants proposed in this submittal are the same team that has served Miami Lakes, Miami Gardens, Miami Beach and Pinecrest. This team has a proven track record. . The Team's experience in municipalities with residential components similar to the NE 174 Street Neighborhood allows the City of Sunny Isles Beach to reap the benefits of the experience and lessons learned in other Miami-Dade County municipalities. . CMA works with over 30 municipalities in Miami- Dade, Broward and Monroe Counties. This allows CMA to truly be the City of Sunny Isles Beach's consultant and advisor in regards to the design, permitting, bidding process and construction process. Experience counts. . Our track record and tactics to communicate with residents during construction with City staff or through public meetings is a significant advantage. Even the best design needs to be communicated properly. Empowering the community through the process makes a difference. {iJ, Clly or Sunny Isles Beach NE 174Streel OrainageAnalysis Figure 3: L0(:3oonMap "~ The CMA Advantage . Chen Moore and Associates believes in creating sustainable communities. As such, Chen Moore and Associates has been involved in over $350 million of redevelopment projects for Broward County since 1992, including BODRs, design, permitting and construction services including improvements/ rehabilitation projects and coordination with historical districts. . Chen Moore and Associates recently hosted LEED Training in our offices. . Chen Moore and Associates is committed to the communities where we work. We are involved for the long term to be part of your communities' past, present and future. \ I ) \ I Schedule 9 4~UOIAI " Q) Q) u o ... c.. o .... Q) u ',c o z E o ... - Q) E i= S 4~UOIAI 17 4~uOIAI E 4~UOIAI Z 4~UOIAI "0 OJ W Ci E o u c o '.p co c -c '- o o U .-t= E '- ClJ a.. >- '- co c 'E Qj '- a.. "0 2:l ClJ Ci E o u * c o ".p co c :0 '- o o u >- "-t= '.p ::l "0 OJ +-' OJ Ci E o u Vl ~ OJ OJ $: N Vl E e o ~ N '" ~ OJ OJ $: N ~ o o .-l tlO C "C ClJ ClJ C "00 C UJ co c u: OJ :i "0 OJ ..c u Vl +-' e .~ o OJ :J "0 OJ ..c u Vl +-' e .~ o .... OJ 0.. '" OJ o z OJ .0 +-' o '" ~ E '3 ::J e '" 0 OJ u 'g~ tn ~ tE E ~ 5 +-' .... VI ':; QJ e E OJ :J OJ VI :t:' '" '" co e OJ 0 > 0 .8 e co ~ OJ co :i OJ ~ Qj ..c..c u +-' Vl"O "0 e 2:l co co "0 E ~ ".p .s ..'tl er ~ ClJ :J "0 B OJ E ..p '" :;: OJ "S; OJ cr:: ~ o .... .E OJ E ..p :;: OJ .S; ~ ~ OJ OJ :;: N e o "0 OJ '" '" .0 .~ OJ :i "0 OJ ..c u Vl '" o.O~ .8 "E "_ -0 E ~ ~b +-' ClJ e E OJ ..p E +-' e '" Qj a:; ~ E bO".p o :;: - ClJ .s .~ e .... o >- E ~ N ~ '" '" 2:l e '" 0 .9- "0 .~ ~ e '" co-O OJ bO - e -5 "8 l! "E u .... Vl OJ ,0.. .... OJ Q. "0 OJ "0 .S; ~ Q. OJ .0 OJ -c '" 9 "E "~ 2 vl ->< o :5: "!::! :0 :J a.. OJ -c '" o E "~ 2 ",' e o 'P '" "!::! e :J E E o u ~ .3 o I .... ..c bO ::J Vl o<S~ Qj ..Vl :;:~ o Q. 0.. 0 co OJ "00.. "t: 0 ..Q ~ "-I'" '"0 6 e ".p '" :J '" :g :E tlE o::J I- "~ o1l:Q \:i:~ ",' ..c e u o co "~ ~ .~ E :J '" E .- E ~ oE ~ 0 ".p z ~'Q ~ .~ V;U OJ ....' :e ~ p OJ ::JVl ~-g "0 co ~ Qj U +-' e co * $: t 4~UOIAI c o 'J:; ra .... :J o <II E ra z ~ VI {2. '" ~ OJ OJ $: N '" ~ OJ OJ $: lD Vl ~ OJ OJ $: <:t ~ <( o :::::; ?i o ~ c "~ Vl ClJ o >- '- co c E Qj '- a.. ~ o ~ C tlO "Vi <II o 3: ClJ .:;: ClJ cr:: >- .... (] tlO C :€ E '- ClJ a.. .... c ClJ E c .... ClJ > o t!J co .... co o c o ".p co > ~ UJ tlO C ".p Vl 'x UJ 3: ClJ .:;: ClJ cr:: >- .... (] co c u: .... OJ 0.. ClJ u C co .... "~ Vl Vl <( tlO C -c -c co Vl .... ::l o ClJ Vl o Q o(l Vl ClJ u .:;: '- ClJ </l C o '.p u 2 .... Vl C o U co e o e ..p 0 :O'P "0 co '" e ...."0 a 0 e 8 >-OJ E~ , OJ "O..c OJ u .... '" .s "0 ere ~ co ~~ , e '" OJ g,oE .~ .~ OJ :J E ~ "~ :Q ::J :J ".p 0.. 0 , e = '3 '" OJ u .~ OJ '" e o ..p u 2 +-' '" C o u "0 C co OJ u e ~~ 'Vi ::J ","0 co OJ bO..c .S ~ "0 +-' "0 C di "~ ,w Project Experience Lake Patricia Neighborhood Roadway & Drainage Improvements, Miami Lakes, Florida This project consists of the implementation of drainage improvements identified on the most recent ;" Town of Miami Lakes Stormwater Master Plan within approximately one square mile of an existing residential neighborhood near Lake Patricia in southern Miami Lakes near Ludlam Road. Services include utility coordination, schematic and final design phases, government permitting, bidding assistance, construction administration and statements of work completion. The CMA team modeled the existing conditions to derive the best value locations for stormwater improvements, while maximizing and improving the current stormwater system. The designs included connecting portions of the existing system and utilizing strategic locations for exfiltration trench to increase the overall storage capabilities of the neighborhood. CMA is also assisting Miami Lakes with the acquisition of a Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant. This task entailed rainfall data collection, additional pre-improvement versus post-improvement stormwater analysis using GIS, analysis of potential damages to homes during various rainfall events using Army Corp of Engineers (ACOE) criteria and the comparison of benefits versus cost of the project. These tasks were compiled in a report that was submitted to FEMA for review. Client Town of Miami Lakes Hiram Siaba 15150 NW 79 Ct, 1st Floor Miami Lakes, FL 33014 (305) 364-6100 ) --, \ , NW 191st Street Area Drainage Improvements, Miami Gardens, Florida Chen Moore and Associates (CMA) was asked by the City of Miami Gardens to design the stormwater improvements for the residential area from NW 9th Avenue to NW 10th Place and from NW 191st Street to NW 193rd Street. The design had a total construction budget of over $400,000 per a grant received by the City. CMA evaluated the existing site conditions to strategically design roadway, drainage and sidewalk improvements to meet the most critical needs of the City and maximize the value of their construction budget. The design included strategic placement of exfiltration trench at key areas of the existing residential area, while looking for opportunities to interconnect portions of existing systems that has been working independently. Strategic areas were chosen to be regarded per the results of the drainage modeling. The design considered elements related to the pedestrian paths and parallel parking adjacent to Norland High School. The project scope included government permitting, bidding services and construction administration to support the efforts of City staff. CMA has worked with the City on a number of additional projects under our continuing services contract providing similar roadway and stormwater engineering services as well other services. Example additional projects CMA has successfully completed for the City of Miami Gardens include: . Miami Gardens GIS Stormwater Atlas . NW 38 Court Drainage Improvements . 133.003 NW 38 Ave to NW 38 Place (NW 208 Street to NW 209 Street) Drainage Improvements . 133.002 NW 19th Ave To NW 21st Ave: from NW 191 Tr To NW 26th St Drainage Improvements . Le Jeune Bridge Design Build Criteria Package Client City of Miami Gardens Mariana Pitiriciu, P.E. 1050 N.W. 163rd Dr. Miami Gardens, FL 33169 (305) 622-8000 x3386 ) 1 I I I I ) _./ Village of Pinecrest (Various Projects), Pinecrest, Florida SW 72nd Avenue Chen Moore and Associates (CMA) modeled the existing stormwater conditions along SW 72nd Avenue from SW 112th Street to SW 120th Street to determine the existing level of service on the roadway and the swales adjacent to large estates. CMA utilized GIS and developed an AdlCPR model to determine the appropriate rain storm elevations for the desired level of service and prepared drainage improvement plans along the right-of-way. Improvements included additional positive drainage connections and strategic locations for exfiltration trench. CMA met with each resident with Village officials to communicate and coordinate changes while working to minimize potential conflicts during construction. The design included minor traffic/roadway modifications, ADA grading considerations along with a significant effort to balancing the residents' requests to protect the existing mature tree canopy while addressing expectations for drainage. The plans were reviewed by Miami-Dade County Public Works, the Miami-Dade Department of Environmental Resource Management (DERM) and the Village. Services included bidding assistance, meetings with each resident adjacent to the project, construction observation/inspection and project closeout services. SW 60th Avenue Sidewalk and ROW Improvement Project, Pinecrest, Florida Chen Moore and Associates prepared sidewalk expansion plans for over 2 Yz miles of sidewalk within an existing wooded estate residential community. The design included traffic/roadway modifications, ADA grading considerations along with a significant effort to balancing the Miami-Dade County Public Works specifications with the residents' requests to protect the existing mature tree canopy. The project included rights-of-way within the Village of Pinecrest and the City of Coral Gables. The plans were permitted via both municipalities and Miami-Dade County Public Works. Services included bidding assistance, meetings with each resident adjacent to the project, construction observation/ inspection and project closeout services. In addition to the above project descriptions, CMA has successfully completed over 20 additional projects including providing roadway and stormwaterengineeringservices, drainage reviews, dog park design concepts, turn lane design and sidewalk projects. Additional projects CMA has completed for the Village of Pinecrest include: . Flagler Grove Park Left Turn Lane .----....-...--. . Suncrest Drive & Moss Ranch Road Stormwater :::::;==::::::::::-- ............---.,.......-....-.- Improvements .=~=_._-- . SW 104th Street Drainage Improvements . SW 105th Terrace Roadway Improvements . SW 64th Court Drainage Improvements . SW 73 Avenue (SW 93 Terrace to SW 96th Street) Drainage Improvements . SW 72 Court Drainage Analysis . SW 79th Avenue Roadway Improvements . SW 69th Avenue and SW 90th Street Roadway Project . Veteran's Way Dog Park Conceptual Plans Client Village of Pinecrest Daniel Moretti 10800 Red Road Pinecrest, FL 33156 (305) 669-6916 .---..-..-..----- ..................-..-- .---...-.......-.-.- "'__..__.......,.....tJ___ ) NE 173rd Street Right of Way Improvements, North Miami Beach, FL Chen Moore and Associates prepared right-of-way improvement plans for NE 173rd Street from West Dixie Highway to NE 23rd Avenue within an existing residential community. The design included storm~~ter improveme~ts, g formalizmg of onstreet parkmg, . . traffic/roadway modifications, sidewalks with ADA grading considerations and preserving and incorporating existing trees and resident requests. This project also included the design of a traffic circle to provide traffic calming as well as streetscape beautification with a stamped concrete apron and landscaping. The design plans were permitted via the City of North Miami Beach, Miami-Dade County Department of Environmental Resources Management and Miami-Dade County Public Works Traffic Engineering Department. Services included design, permitting, bidding assistance and limited construction administration services. CMA has worked with the City on a number of additional projects under our continuing services contract providing similar roadway and stormwater engineering services as well other services. Example additional projects CMA has successfully completed for the City of North Miami Beach include: . CRA Infrastructure Master Plan . Highland Village Sewer Improvements . Western Eastern Shores Right of Way Improvement Project (Stormwater/Roadway Improvements) . NW 172nd Street Right of Way Improvements Project (Stormwater/Roadway Improvements) . NE 168th Street Right of Way Improvements Project (Stormwater/Roadway Improvements) . NE 18th Street Right of Way Improvements Project (Stormwater/Roadway Improvements) Client City of North Miami Beach Hiep Huynh, P.E. 17050 NE 19 Avenue North Miami Beach, FL 33162 (305) 948-2925 . - ,-~ Sunset Islands 1 & 2, Miami Beach, FL Chen Moore and Associates is providing planning, modeling, design, permitting, preparation of construction documents, bid and award and construction engineering and observation services for infrastructure improvements within the public righ of way areas of the Sunset Islands I and II neighborhood of Miami Beach. The project encompasses approximately 11,000 LF of ROW infrastructure improvements including watermain replacements, stormwater drainage improvements, paving and grading, streetscaping enhancements and roadway reconstruction. The project also required extensive coordination with the public, the homeowners association, and various regulatory agency. As part of the project stormwater and drainage services, extensive analysis was conducted utilizing ICPR modeling and GIS to meet and/or exceed required stormwater Level of Service standards. The proposed stormwater design included the introduction of catch basins and stormwater piping to effectively collect and route the stormwater to 11 existing outfalls to Biscayne Bay. Due to the environmental sensitivity of Biscayne Bay design and implementation of water quality treatment measures was an important c) ) consideration and design factor of the system prior to outfall to the Bay which included utilizing exfiltration trench. Additionally, as the outfalls were existing a review and evaluation of the conditions of the outfalls was conducted and rehabilitation, upsizing and retrofitting the existing outfalls was a part of the final design. This project was closely coordinated with regulatory agencies at the outset of the project and throughout the design to ensure an expedient review and issuance of the permit. - .;.--:-=...~. .'-.1- ,- .- iI: r;. #:i:;; a?blll'...~.ff~~r~'';~'' ~"'fl.., ~, " . \0- r." f::.. . J...., "',;$"...- ~.. .. :'. . .... ~" . ",fflAJV :. . . ~ ii"' " ,pre .if W;.' '~ J.J' ~r 'of,' l'P." 'q l""Vi : '"," 'J "';'1: Ilh'~ ~~ l.il .'.i.\ .~~ ~ ,~....O:.' . ~ ""...... ~ 'I' "", ~.... s:r. . \ .. ~: ,q.W"~ -:-f~; ..'tl 11 -rA'~ -~ g :.-:c, . ~ ~ ..r.o ,. ..,.. ., .j, .. ".M . ,. ., ,j a I';' A 11 h_ ,.~....... ~..,., .-c" '~ . ' , '.. 0" ..~. \tr;~~~' j;:;' '.~. t~:~,~~-,i' .~~ ~~~~'r.~. ... . Q . ....~ <5 0"'..-_9t. .,.'. - 'W .n -,'--- --'ji-~'("- ;:: ;;. .. -. -...... .~ - --..- ~ .... ........ ....... C9 MIAMI BEACH Sunset Island II Existing Storm Drainage o 100 ;'00 -=:=F... .~~~~ II:..' J!M.~' i !(f'~;~:i;/' '. ~~~.';'.,~\t~'\.. .~ ~t~}.-: \ :'~<;p ."...~". -I .sf .,' ... /"~ '7-:' ~ '. gT.,.,~. ;:-': ;- "" ,'. _ ".-'';)= '. ~, -f.'''I ~I I~~, If' ('lilt'" ' :.:t.. ,. ~~"O. Bail' ... ~..'1. ,. ~. ....k. pw;Jl. a."'~ -L,1 \oil. . .:..r.1 -. (l.;.,.... .. '. / · \ '.: .~.:.... , ,"',~ 1i ::'i. ":I~t~ ~. ?>o/ ~ ~!11..._~, i...,. ,~9:,,"!_.._n. _ ~~:...t(,i.\ '~'"i~ ...... ~-i _ _"'I -~1- r..p - -_ "'':- :d..-. ~ ....... C9 MIAMI BEACH Sunset Island I Existing Storm Drainage o '00 ~ ~~. .~JQ9;\~U:~~ .-. j . Client Miami Beach Maria Hernandez 1700 Convention Center Drive Miami Beach, FL 33139 (305) 673-7000 ext 2584 South Pointe Phase III!IV/V - ROW Roadway and Drainage Improvement Project, Miami Beach, FL Chen Moore and Associates is providing surveying, planning, geotechnical investigation, modeling, design, permitting, preparation of construction 1.; documents, bid and award and construction engineering and inspection services for infrastructure improvements within the public right of way areas of the South Pointe III/IV/V neighborhood of Miami Beach. The project encompasses approximately 19,000 LF of ROW infrastructure improvements including water t\ Ii" __, main replacements, stormwater drainage I. improvements, paving and grading, streetscaPingi:~;. enhancements, landscaping improvements,~; lighting improvements, and roadway.:;' reconstruction. This project also required extensive coordination with the public, adjacent CRAs, historic districts and various regulatory agencies. ) As part of the proposed stormwater and drainage services, extensive analysis was conducted utilizing ICPR Modeling and GIS to meet and/or exceed required stormwater Level of Services standards. The proposed stormwater design included the introduction of catch basins, and stormwater piping to effectively collect and route the stormwater to 16 drainage gravity wells and stormwater pump station with overflow outfall connections to Biscayne Bay. Due to the environmental sensitivity of Biscayne Bay design and implementation of water quality treatment measures was an important consideration and design factor of the system prior to outfall to the Bay and was closely coordinated with regulatory agencies during the permitting process. Client City of Miami Beach Carla Dixon 777 17th Street, 3rd Floor Miami Beach, FL 33139 (305) 673-7071 City Center Right of Way and Utility Improvement Project, Miami Beach, FL Chen Moore and Associates surveying, planning, geotechnical investigation, design, modeling, permitting, preparation of construction documents, bid and award and construction engineering and inspection services for infrastructure improvements within the public right-of-way areas of the City Center neighborhood of Miami Beach. :#J! ,._, ,. -1 The project encompasses approximately 24,000 LF of ': .I' '1 L ROW infrastructure improvements including water main " J --,_, - replacements, sanitary sewer upgrades, stormwater ""j a 1"-::1 ~";, '- ""'7'< drainage improvements, pavingandgrading,streetscaping .Ii ;1: ~ enhancements, landscaping improvements, lighting _t.:iIIiI.ir^'~, .._(~...J improvements, and roadway reconstruction. This project also required extensive coordination with the public, adjacent CRAs, historic districts and various regulatory agencies. As part of the proposed stormwater and drainage services, extensive analysis was conducted utilizing ICPR Modeling and GIS to meet and/or exceed required stormwater Level of Services standards. The proposed stormwater design included the introduction of catch basins and stormwater piping to effectively collect and route the stormwater to 16 drainage gravity wells with overflow outfall to Dade Canal. Water quality treatment was an important consideration and design factor of the system to ensure that appropriate treatment was provided prior to discharge to the gravity wells and outfalls. Client City of Miami Beach Carla Dixon 777 17th Street, 3rd Floor Miami Beach, FL 33139 (305) 673-7071 ") \ , University Drive Improvements, Cooper City and Davie, Fl The Chen Moore Team designed a new right turn lane and bus bay from University Drive (FOOT SR 817) into the future entrance to the Town Center component of the Monterra Development in Cooper City (north of Sheridan Street). The project required the design and construction of two - 9 foot box culverts (approximately 120 LF), the demolition and relocation of +/- 2,000 LF of water main from Davie Utilities and doubled the width of +/- 2,000 LF of the existing Central Broward Water Control District (CBWCD) canal along University Drive. Coordination efforts were conducted with the CBWCD, Town of Davie Engineering, Town of Davie Fire Marshall, Town of Davie Utilities, Cooper City Utilities, Broward County and the Florida Department of Transportation. The project was completed simultaneously with the University Drive Canal Expansion Project. Chen Moore and Associates' services included roadway, drainage, earthwork and utility design; government permitting; conducting public bidding for the Monterra Community Development District (CD D); construction observation and closeout services. Client CM Monterra Property LLC James Wright 135 San Lorenzo Ave Ste 740 Coral Gables, FL 33146 (305) 632-2990 Solano Avenue Roadway Design and Construction Administration, Cooper City, Fl Chen Moore and Associates designed an over half-mile long roadway that connects Sheridan Street and University Drive, mixed-use residential areas and the Town Center component of the Monterra Development in Cooper City. Solano Avenue was designed to create a relationship between the mixed- use residential, Town Center, pedestrian walkways, parallel parking and green spaces to promote walkability, social interaction and give the area a sense of community. This required a variance to reduce and relocate the required berm along the property frontage to the roadways. Chen Moore and Associates' services included roadway, drainage, earthwork and utility design; government permitting including PMUD rezoning; conducting public bidding for the Monterra Community Development District (CD D); construction observation and closeout services. Client CM Monterra Property LLC James Wright 135 San Lorenzo Ave Ste 740 Coral Gables, FL 33146 (305) 632-2990 ) I I Fort Lauderdale-Hollywood International Airport Stormwater Master Plan Update Phases I and II, Broward County Aviation Client Broward County Aviation Department Carlos Hernandez 100 Aviation Boulevard Ft. Lauderdale, FL 33315 (954) 359-2255 Neighborhood Improvement Project - Traffic Calming, Dania Beach, FL Chen Moore and Associates designed and administered the construction of a series of traffic calming elements. The design included 5 roundabouts, 2 raised intersections, 2 speed tables, 3 raised medians, 2 partial closures, a bike lane and 10 speed humps. The project is located SE of Dania Boulevard and US 1 with challenges that included right of way limitations and easement considerations, coordination with property owners, roadway elevation consistency, preserved County lands, and roadway realignments. The project required coordination with other consultant projects and agencies. The implementation of these devices will not only help calm traffic throughout the neighborhood, making the streets safer, it will also provide more aesthetically pleasing elements for the residents to enjoy. Client City of Dania Beach Dominic Orlando 100 W. Dania Beach Blvd. Dania Beach, FL 33004-3643 (954) 924-3740 \ , ....... p,.. Oania Beach Roundabouts.. u ~ IfS) Proposed Easements 'iIlF'~~~ ~ --~- --~ c;:J-- NE 15th Avenue & 18th Street Roundabout, Fort Lauderdale, FL The NE 15th Avenue and NE 18th Street Roundabout Safety Improvement project entailed designing CITY OF FORT UUOERDALE improvements to the existing roundabout at which a significant N.E.15"'AVEN';':-.~.~p~~:::::::TROUND-ABOUT amount of accidents occurred. The City wanted to modify the existing roundabout in order to minimize construction costs while still addressing the existing problems. Chen Moore and Associates made design suggestions to make the incoming lanes narrower and have more deflection in order to slow traffic. Chen Moore and Associates also proposed connecting the bike lanes to the sidewalk in order to eliminate bicycle traffic from going through the roundabout. ) I ~.I...f.1 II r: tj' ~ ':t }At 1'/ " , _;1 '.-'-1,f1 . ~-.' ~ ______\ J p~~ ;; , . '.\'.: 11;11' ,:~ ,., l~ fY~ ~ 1 ~ ~f 1%4, @on'IClfl'Ul<<~ SOCIATES I 8, \ ~ ,;. A! ,...........-.....-. FEBRUARY 2008 ~....NI..........ru1\..: , -" Client City of Fort Lauderdale Peter Partington 100 N. Andrews Avenue Fort Lauderdale, FL 33301 (954) 828-5240 ) Stoner and Associates (Survey) City of Sunrise - N.W. 136th Avenue Performed a topographic survey of N.W. 136th Avenue, from the north approach slab of the New River Canal Bridge to the south side of Sunrise Boulevard and from the west back of curb to the east back of curb. Total length of project: 9,540 linear feet. City of Sunrise - Entry Feature Walls Performed topographic surveys for eleven sites. Surveys were for the design and construction of new entry feature signs. City of Miami Beach - South Pointe II Performed a right-of-way and topographic of a southern portion of Miami Beach. Located aboveground improvements. Prepared storm and drainage as-builts. This survey was for the re-design of roads and drainage systems. \ I Nutting Engineers 0/ Florida Inc. (Geotechnical Engineering) Sunny Isles Fire Rescue Station #10, 175 172nd Street, Sunny Isles, Florida Nutting performed geotechnical exploration/engineering and construction materials testing services for the construction of a new 2-story ~12,OOOSF fire rescue station. Atlantic Isles Utility and Roadway Improvements, Sunny Isles Beach, Florida Nutting performed geotechnical exploration/ engineering services for the drainage and roadway improvements along the roadway that circumvent the isle. Sunny Isles Beach Government Center, 18070 Collins Avenue Sunny Isles Beach, Florida Nutting performed geotechnical exploration/ engineering services for the construction of a new 24 ft by 36 ft concrete canopy to be supported on two existing and one proposed column. Miami Beach Right-of-Way Infrastructure and Beautification Improvements This project included the replacement of approximately 40,000 lineal feet of 8-12 inch water mains, re- milling of roadways, and the installation of streetscapes including curbing, islands, lighting and parallel parking. ) " , 3. Staffing The Chen Moore Team feels that its organizational approach to stormwater management and roadway design and relevant experience will be the most cost effective and time sensitive due to our focus on being responsive to all of the City's needs. Chen Moore and Assocxiates has 28 full-time staff including 12 professional engineers, one landscape architect, a general contractor, and engineering inspectors to additionally support the key personnel detailed below if required. Dr. Ben Chen, P.E., BCEE is chairman of the firm and will serve as QA/QC for this project. His experience includes urban infrastructure renewal, roadway design, stormwater management, water and wastewater treatment facilities design and construction management, facilities planning, environmental studies, utilities master planning, rate and financial studies. Peter Moore, P.E., LEED AP is president of Chen Moore and Associates will serve as principal-in-charge for this project. He is ultimately responsible for all day to day operations of the firm. His experience includes roadway design, stormwater design, sanitary collection improvements, pump station rehabilitation, transportation engineering enhancements, water and reclaimed water consulting along with all other phases of civil engineering design and neighborhood improvements. Jose L. Acosta, P.E. will serve as the project manager and Engineer of Record of the project. Mr. Acosta has over 12 years of experience and has served as the project manager and Engineer of Record on many similar street and stormwater improvement projects for the Town of Miami Lakes and the City of Miami Gardens. He has also served in a quality control management role with the City of Miami Beach and the Village of Pinecrest. He has previously worked on projects throughout Miami-Dade County utilizing drainage wells, outfalls, exfiltration trench and innovative sustainable stormwater designs for new developments and for improvement of existing neighborhoods. Oscar Bello, P.E. has over twelve years of experience and will be responsible for drainage design. He has experience in planning, design, permitting, and construction management of roadway design, stormwater design, water, wastewater, and municipal drainage projects in Florida including stormwater, pump stations, outfalls, drainage well systems and exfiltration trench. Mr. Bello has been the engineer of record for approximately 43,000 LF of ROW infrastructure improvements in Miami Beach. Michael Buick, P.E. has over 11 years of experience and will be responsible for government permitting. His experience includes planning, design and permitting of site infrastructure including site paving, grading and drainage and site utility plans for land development projects. Mr. Buick is responsible for designing stormwater management systems (paving, grading and drainage) and water and sewer connections including design calculations, running flood routing models, drafting design drawings with AutoCAD, coordinating design with other involved disciplines, calculating opinion of probable costs, and writing Basis of Design Reports. Meghan Wells, E.I., LEED AP has over two years of experience with roadway design and stormwater improvements and will be responsible for utility coordination and design. Marlon John has over nine years of experience with construction administration. He is involved in various projects, which value over $40 million total in construction cost in Miami-Dade and Broward Counties. These projects include the City of Miami Beach, Village of Pinecrest, Dania Beach Neighborhood Improvement Projects, and Broadview Park Neighborhood Improvement Projects Bid Packages 2, 3 & 4. ) Subconsultants Nutting Engineers of Florida, Inc. provides a wide variety of engineering and materials testing services ~Nuning including threshold inspections. Geotechnical engineering services include E Engineers investigations, analysis, and recommendations for site feasibility, foundations, oIF1oddalncIE'labl;,hedl%7 embankments, pavements, retention structures, and other earthworks YourProj<<t/JOurCommltmfnl . proJects. Stoner and Associates, Inc. has over 25 employees including four licensed professional surveyors and mappers supervising six survey field crews. Stoner and Associates ~ON SSOCI'JtT"'S . .. Ti ER&~ M/C ,Inc. has developed a reputation as a professional, reliable company that SURVEYORS _ MAPPERS provides accurate surveys, legal documentation and associated services combined with dependable service for over a decade. ) QA/QC Principal-in-Charge Dr. Ben Chen, P.E., BCEE 1-- Peter Moore P.E., LEED AP . Project Manager Jose.Acosta, P.E. Support Staff ) Government Permitting Michael Buick, P.E. Drainage Design Oscar Bello, P.E. Utility Coordination and Design Meghan Wells, E.!., LEED AP Construction Engineering and Inspections Marlon John Geotechnical Engineering Richard Wohlfarth, P.E. (Nutting Engineers of FL) .Survey James Stoner, PSM (Stoner & Associates) '"Note: Miami-Dade County certifiedCBE firm. Key Personnel I Function in the Company Peter Moore P.E., LEED AP President Dr. Ben Chen, P.E., BCEE ;~ Chairman Jose Acosta, P.E. Senior Engineer, Branch Manager Michael Buick, P.E. Senior Engineer Oscar Bello, P.E. Senior Engineer Meghan Wells, E.!., LEED AP Associate Engineer Marlon John Engineering Inspector Resumes ) \ CHeRE J &ASSOClATES Ben H Chen, PhD, PE, BCEE Chairman and Founder Education Bachelor of Science, Civil Engineering, National Taiwan University, 1967 Master of Science, Sanitary Engineering, National Taiwan University, 1969 Doctor of Philosophy, Civil Engineering, Virginia Polytechnic Institute and State University, 1973 Registration Professional Engineer, Florida, 31849, 1982 Professional Engineer, Virginia, OD8803, 1976 Professional Affiliations . American Academy of Environmental Engineers . American Society of Civil Engineers . American Water Works Association . Florida Engineering Society . National Society of Professional Engineers . Society of Military Engineers . Water Environment Federation \ , Certifications Diplomate, American Academy of Environmental Engineers Summary Dr. Chen has over 44 years of civil and environmental engineering experience. His experience includes urban infrastructure renewal, water and wastewater treatment facilities design and construction management, facilities planning, environmental studies, utilities master planning, rate and financial studies. He is the project director for a number of projects including City Center and South Pointe Right of Way Infrastructure Improvement Projects for Miami Beach and principal-in-charge for the Central Broward County and Broadview Park Neighborhood Improvement Projects for Broward County. Project Experience Miami Beach City Center Right of Way Improvement Project. Chen Moore and Associates is the prime consultant and was responsible for providing surveying, planning, geotechnical investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and inspection services for infrastructure improvements within the public right of way areas of the City Center neighborhood of Miami Beach. The project encompasses approximately 24,000 LF of ROW infrastructure improvements including water main replacements, sanitary sewer upgrades, storm water drainage improvements, paving & grading, streetscaping enhancements, landscaping improvements, lighting improvements, and roadway reconstruction. This project also required extensive coordination with the Public, adjacent CRAs, historic districts and various regulatory agencies. As part of the proposed stormwater and drainage services, extensive analysis was conducted utilizing ICPR Modeling and GIS to meet and/or exceed required stormwater Level of Services standards. The proposed stormwater design included the introduction of catch basins and stormwater piping to effectively collect and route the stormwater to 16 drainage gravity wells with overflow outfall to Dade Canal. Water quality treatment was an important consideration and design factor of the system to ensure that appropriate treatment was provided prior to discharge to the gravity wells and outfalls. Village of Pinecrest SW 79th Avenue Roadway Improvements. Chen Moore and Associates provided professional engineering services for the planning, design, and permitting of the roadway improvements to SW 79th Avenue and SW 112th Street, including the reconfiguration of SW 79th Avenue between SW 110th Street and SW 112th Street, the construction of a right turn lane extension from SW 112th Street onto US-1, and the construction of drainage improvements to www.chenmoore.com CHeRE ""'\ &ASSOCIATES Jalleviate flooding concerns along the project roadways. The reconfiguration of SW 79th Avenue included the conversion of an existing bidirectional roadway into a one-way roadway and the construction of new sidewalk, curb and gutter, and a parallel parking lane along the west side of the roadway. North Miami Beach NE 162nd Street Improvements. Chen Moore and Associates was selected as one of the consultants to participate in the Proud Neighborhoods Capital Improvement Project for the City of North Miami Beach. To date, Chen Moore and Associates has completed four right of way improvements projects within the City. Each of these areas has included roadway and drainage improvements along with additional hardscape and landscape elements. This project includes right of way improvements to NE 162nd Street between NE 17th Avenue and NE 18th Avenue adjacent to Allen Park. North Miami Beach NE 173rd Street Right of Way Improvements. Chen Moore and \Associates prepared right-of-way improvement 'plans for NE 173rd Street from West Dixie Highway to NE 23rd Avenue within an existing residential community. The design included storm water improvements, formalizing of on street parking, traffic/roadway modifications, sidewalks with ADA grading considerations and preserving and incorporating existing trees and resident requests. This project also included the design of a traffic circle to provide traffic calming as well as streetscape beautification with a stamped concrete apron and landscaping. The design plans were permitted via the City of North Miami Beach, Miami-Dade County Department of Environmental Resources Management and Miami-Dade County Public Works Traffic Engineering Department. Services included design, permitting, bidding assistance and limited construction administration services. Village of Pinecrest Suncrest Dr & Moss Ranch Rd Drainage Analysis. Chen Moore and Associates worked with the Village of Pinecrest to review existing conditions and evaluate the existing stormwater Level of Service (LOS) within the Suncrest Drive & Moss Ranch Road area due to resident concerns. CMA conducted an analysis of the area, provided recommendations for drainage improvements to meet Village LOS standards, and provided full design, permitting and construction document preparation services. As part of the project, CMA also assisted the Village in conducting public information meetings, bidding the project, evaluating the bids received and providing periodic site observations during construction. Miami Gardens NW 191st Street Drainage Improvements. Chen Moore and Associates (CMA) was asked by the City of Miami Gardens to design the stormwater improvements for the residential area from NW 9th Avenue to NW 10th Place and from NW 191st Street to NW 193rd Street. The design had a total construction budget of over $400,000 per a grant received by the City. CMA evaluated the existing site conditions to strategically design roadway, drainage and sidewalk improvements to meet the most critical needs of the City and maximize the value of their construction budget. The design considered elements related to the pedestrian paths and parallel parking adjacent to Norland High School. The project scope included government permitting, bidding services and construction administration to support the efforts of City staff. Miami Gardens NW 19th Ave To NW 21st Ave: from NW 191 Tr. To NW 26th St. Chen Moore and Associates (CMA) was asked by the City of Miami Gardens to design the stormwater improvements for the residential area from NW 19th Avenue to NW 21st Avenue and from NW 191 Tr to NW 26th Street. The design had a total construction budget of over $350,000 per a grant received by the City. CMA evaluated the existing site conditions to strategically design roadway, drainage and sidewalk improvements to meet the most critical needs of the City and maximize the value of their construction budget. The project scope included government permitting, bidding services and construction administration to support the efforts of City staff. www.chenmoore.com CHeRE ., &ASSOCIATES Peter M Moore, PE, LEED AP President and CEO Education Bachelor of Science, Civil Engineering, University of Florida, 1997 Master of Engineering, Civil Engineering, University of Florida, 2004 Registration Professional Engineer, Florida, 58709, 2002 Professional Affiliations . American Society of Civil Engineers . Florida Engineering Society . Florida Stormwater Association . National Society of Professional Engineers Certifications Certified Stormwater Inspector LEED Accredited Professional )summary As the President of the firm, Mr. Moore is ultimately responsible for all day to day operations of the firm. Mr. Moore has a broad range of civil engineering experience including stormwater management, roadway design, sanitary collection improvements, pump station rehabilitation, transportation engineering enhancements, water and reclaimed water consulting along with all other phases of civil engineering design and neighborhood improvements. Additionally, Mr. Moore serves as the Assistant City Engineer for the City of Coral Springs and is the spokesperson for the City's Engineering Division. Finally, Mr. Moore serves on the firm's QA/QC Committee ensuring the consistency of the quality product throughout the firm. Project Experience Miami Beach - South Pointe Phase III/IV IV - ROW Improvement Project. Chen Moore and Associates is the prime consultant and is responsible for providing surveying, planning, geotechnical investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and inspection services for infrastructure improvements within the public right of way areas of the South Pointe III/IV/V neighborhood of Miami Beach. The project encompasses approximately 19,000 LF of ROW infrastructure improvements including water main replacements, stormwater drainage improvements, paving & grading, streetscaping enhancements, landscaping improvements, lighting improvements, and roadway reconstruction. This project also required extensive coordination with the public, adjacent CRAs, historic districts and various regulatory agencies. As part of the proposed stormwater and drainage services, extensive analysis was conducted utilizing ICPR Modeling and GIS to meet and/or exceed required stormwater Level of Services standards. The proposed stormwater design included the introduction of catch basins and storm water piping to effectively collect and route the stormwater to sixteen drainage gravity wells and a stormwater pump station with overflow outfall connections to Biscayne Bay. Due to the environmental sensitivity of Biscayne Bay design and implementation of water quality treatment measures was an important consideration and design factor of the system prior to outfall to the Bay and was closely coordinated with regulatory agencies during the permitting process. Miami Lakes Lake Patricia Roadway & Drainage Improvements. Chen Moore and Associates is implementing drainage improvements identified on the most recent Town of Miami Lakes Storm water Master Plan for approximately one square mile of an existing residential neighborhood near Lake Patricia in southern Miami Lakes near Ludlam Road. Services include utility coordination, schematic and final design phases, government permitting, bidding assistance, construction www.chenmoore.com CH~RE ) &ASSOClATES administration and statements of work completion. The final design included approximately 1,900 LF of exfiltration trench and rehabilitation/upsizing of 6 existing outfalls. CMA is also assisting Miami Lakes with the acquisition of potential grant opportunities for funding the construction of the proposed improvements. Miami Beach Sunset Islands 1 & 2. Chen Moore and Associates designed stormwater, water main, and roadway improvements for the City of Miami Beach Sunset Islands 1 & 2 neighborhood. As part of the proposed storm water and drainage services, extensive analysis was conducted utilizing ICPR Modeling and GIS to meet and/or exceed required storm water Level of Service standards. The proposed stormwater design included the introduction of catch basins, exfiltration trench and stormwater piping to effectively collect storm water, provide water quality treatment and route the stormwater to existing overflow outfalls to Biscayne Bay. As part of the project, an existing condition assessment of the existing )outfalls was conducted and rehabilitation and upsizing of the existing outfalls as required was proposed. This stormwater project due to its outfall to Biscayne Bay required extensive permitting coordination with Miami-Dade County DERM, South Florida Water Management District and the US Army Corps of Engineers. Village of Pinecrest SW 73rd Rd from SW 93rd Tr to SW 72 Ave. Chen Moore and Associates assisted with drainage improvements for SW 73rd Rd. Chen Moore and Associates also developed an ICPR Model to determine maximum flood elevation, provided a technical memorandum and submitted final plans. Chen Moore and Associates worked with the Village of Pinecrest to review existing conditions and evaluate the existing stormwater Level of Service (LOS) within the SW 73rd Road residential neighborhood from SW 93rd Terrace to SW 72nd Avenue due to resident concerns. CMA conducted an analysis of the area, provided recommendations for drainage improvements to meet Village LOS standards, and provided full design, permitting and construction document preparation services. As part of the project, CMA also assisted the Village in conducting public information meetings and evaluating the bids received. North Miami Beach NE 168th Street Roadway Improvements. Chen Moore and Associates provided consulting engineering services for the NE 168 Street (between NE 18 Avenue and NE 19 Avenue) and NE 18 Avenue (between NE 168 Street and NE 169 Street) right of way improvements. The scope of the project included addressing drainage concerns, providing new curbing and street paving, replacing/adding sidewalks, providing new paved parking areas which were gravel, and providing landscaping areas for future plantings to be completed by the City. Miami Gardens NW 38th Ct Drainage Improvements. Chen Moore and Associates designed stormwater improvements for the residential area of NW 38th Avenue to NW 38th Place & NW 208th Street to NW 209th Street. The design had a total construction budget of $175,000 per a grant received by the City. CMA evaluated the existing site conditions to strategically design roadway, drainage and sidewalk improvements to meet the most critical needs of the City and maximize the value of their construction budget. The project scope included government permitting, bidding services and construction administration to support the efforts of City staff. Village of Pinecrest SW 64th Ct Drainage Improvements. Chen Moore and Associates worked with the Village of Pinecrest to review existing conditions and evaluate the existing stormwater Level of Service (LOS) within the SW 64th Court residential cul-de-sac neighborhood south of Kendall Drive due to resident concerns. CMA conducted an analysis of the area, provided recommendations for drainage improvements to meet Village LOS standards, and provided full design, permitting and construction document preparation services. As part of the project, CMA also assisted the Village in conducting public information meetings and evaluating the bids received. www.chenmoore.com CHeRE ) &ASSOCIATES Jose Luis Acosta, PE Project Manager Education Masters of Business Administration, Master of Business Administration, Auburn University, 2003 Bachelor of Science, Civil Engineering, University of Miami, 1999 Bachelor of Science, Architectural Engineering, University of Miami, 1999 l I I Registration Professional Engineer, Florida, 63827, 2004 Natl. Council of Examiners for Eng. & Surveying, 41987 ) Professional Affiliations . American Society of Civil Engineers . Cuban American Association of Civil Engineers . Florida Engineering Society . National Society of Professional Engineers . Society of Military Engineers . Urban Land Institute Certifications Stormwater Management Inspector Summary Jose Acosta, P. E. is a project manager and leads Chen Moore and Associates' Miami office. Previously, Mr. Acosta served as the director of engineering, senior project manager and senior engineer for a regional multi-disciplinary firm. He served as both the director of engineering and service manager for five south Florida offices where he was responsible for a staff of over 50 staff members. Project Experience Miami lakes lake Patricia Roadway & Drainage Improvements. Chen Moore and Associates is implementing drainage improvements identified on the most recent Town of Miami Lakes Stormwater Master Plan for approximately one square mile of an existing residential neighborhood near Lake Patricia in southern Miami Lakes near Ludlam Road. Services include utility coordination, schematic and final design phases, government permitting, bidding assistance, construction administration and statements of work completion. The final design included approximately 1,900 LF of exfiltration trench and rehabilitation/upsizing of 6 existing outfalls. CMA is also assisting Miami Lakes with the acquisition of potential grant opportunities for funding the construction of the proposed improvements. Monterra Development Solano Avenue Roadway Design and Construction Administration. Chen Moore and Associates designed an over half-mile long roadway that connects Sheridan Street and University Drive, mixed-use residential areas and the Town Center component of the Monterra Development in Cooper City. Solano Avenue was designed to create a relationship between the mixed-use residential, Town Center, pedestrian walkways, parallel parking and green spaces to promote walkability, social interaction and give the area a sense of community. This required a variance to reduce and relocate the required berm along the property frontage to the roadways. Chen Moore and Associates' services included roadway, drainage, earthwork and utility design; government permitting including PMUD rezoning; conducting public bidding for the Monterra Community Development District (CDD); construction observation and closeout services. Miami Gardens NW 19th Ave To NW 21st Ave: from NW 191 Tr. To NW 26th St. Chen Moore and Associates (CMA) was asked by the City of Miami Gardens to design the stormwater improvements for the residential area from NW 19th Avenue to NW 21st Avenue and from NW 191 Tr to NW 26th Street. The design had a total construction budget of over $350,000 per a grant received by the City. CMA evaluated the existing site conditions to strategically design www.chenmoore.com CHeRE "'\ &ASSOCIATES )roadway, drainage and sidewalk improvements to meet the most critical needs of the City and maximize the value of their construction budget. The project scope included government permitting, bidding services and construction administration to support the efforts of City staff. l , I I Monterra Development University Drive Improvements. The Chen Moore Team designed a new right turn lane and bus bay from University Drive (FDOT SR 817) into the future entrance to the Town Center component of the Monterra Development in Cooper City (north of Sheridan Street). The project required the design and construction of two - 9 foot box culverts (approximately 120 LF), the demolition and relocation of +/- 2,000 LF of water main from Davie Utilities and doubled the width of +/- 2,000 LF of the existing Central Broward Water Control District (CBWCD) canal along University Drive. Coordination efforts were conducted with the CBWCD, Town of Davie Engineering, Town of Davie Fire Marshall, Town of Davie Utilities, Cooper City Utilities, Broward )County and the Florida Department of Transportation. The project was completed simultaneously with the University Drive Canal Expansion Project. Chen Moore and Associates' services included roadway, drainage, earthwork and utility design; government permitting; conducting public bidding for the Monterra Community Development District (CDD); construction observation and closeout services. Village of Pinecrest SW 72nd Ave Drainage Improvements. Chen Moore and Associates worked with the Village of Pinecrest to review existing conditions and evaluate the existing storm water Level of Service (LOS) within the SW 72nd Avenue residential neighborhood of the Village due to resident concerns. CMA conducted an analysis of the area, provided recommendations for drainage improvements to meet Village LOS standards, and provided full design, permitting and construction document preparation services. As part of the project, CMA also assisted the Village in conducting public information meetings, bidding the project, evaluating the bids received and periodic site observations during construction. Village of Pinecrest SW 73rd Avenue Stormwater Improvements. Chen Moore and Associates worked with the Village of Pinecrest to review existing conditions and evaluate the existing storm water Level of Service (LOS) within the SW 73rd Avenue from SW 93rd Terrace to SW 96th Street residential neighborhood of the Village due to resident concerns. CMA conducted an analysis of the area, provided recommendations for drainage improvements to meet Village LOS standards, and provided full design, permitting and construction document preparation services. As part of the project, CMA also assisted the Village in conducting public information meetings, bidding the project, evaluating the bids received and periodic site observations during construction. Miami Gardens NW 191st Street Drainage Improvements. Chen Moore and Associates (CMA) was asked by the City of Miami Gardens to design the stormwater improvements for the residential area from NW 9th Avenue to NW 10th Place and from NW 191st Street to NW 193rd Street. The design had a total construction budget of over $400,000 per a grant received by the City. CMA evaluated the existing site conditions to strategically design roadway, drainage and sidewalk improvements to meet the most critical needs of the City and maximize the value of their construction budget. The design considered elements related to the pedestrian paths and parallel parking adjacent to Norland High School. The project scope included government permitting, bidding services and construction administration to support the efforts of City staff. www.chenmoore.com CHeRE ) &ASSOCIATES Michael G Buick, PE Senior Engineer Education Bachelor of Science, Biosystems Engineering, University of Manitoba, 2000 Registration Professional Engineer, Florida, 65894, 2007 Professional Affiliations . American Society of Civil Engineers . Environmental Coalition of Miami and the Beaches . Florida Engineering Society . National Society of Professional Engineers . Urban Land Institute Certifications Certified Stormwater Management Inspector Summary )Mr. Buick has over 11 years of experience in planning, design and permitting of stormwater management systems (paving, grading and drainage) and water and sewer connections for several municipalities in South Florida. Mr. Buick has coordinated storm water management projects with numerous permit agencies throughout South Florida including FDEP, SFWMD, US ACOE, and various County and City agencies and has extensive experience working on projects in environmentally sensitive areas including wetlands and coastal areas. Project Experience North Miami Beach NE 173rd Street Right of Way Improvements. Chen Moore and Associates prepared right-of-way improvement plans for NE 173rd Street from West Dixie Highway to NE 23rd Avenue within an existing residential community. The design included storm water improvements, formalizing of onstreet parking, traffic/roadway modifications, sidewalks with ADA grading considerations and preserving and incorporating existing trees and resident requests. This project also included the design of a traffic circle to provide traffic calming as well as streetscape beautification with a stamped concrete apron and landscaping. The design plans were permitted via the City of North Miami Beach, Miami-Dade County Department of Environmental Resources Management and Miami-Dade County Public Works Traffic Engineering Department. Services included design, permitting, bidding assistance and limited construction administration services. North Miami Beach NE 168th Street Roadway Improvements. Chen Moore and Associates provided consulting engineering services for the NE 168 Street (between NE 18 Avenue and NE 19 Avenue) and NE 18 Avenue (between NE 168 Street and NE 169 Street) right of way improvements. The scope of the project included addressing drainage concerns, providing new curbing and street paving, replacing/adding sidewalks, providing new paved parking areas which were gravel, and providing landscaping areas for future plantings to be completed by the City. Town of Miami Lakes Lake Patricia Roadway & Drainage Improvements. Chen Moore and Associates is implementing drainage improvements identified on the most recent Town of Miami Lakes Stormwater Master Plan for approximately one square mile of an existing residential neighborhood near Lake Patricia in southern Miami Lakes near Ludlam Road. Services include utility coordination, schematic and final design phases, government permitting, bidding assistance, construction administration and statements of work completion. The final design included approximately 1,900 LF of exfiltration trench and rehabilitation/upsizing of 6 existing outfalls. CMA is also assisting Miami Lakes with the acquisition of potential grant opportunities for funding the construction of the proposed improvements. www.chenmoore.com 1 CHeRE -~) &ASSOCIATES Miami Beach Sunset Islands 1 & 2. Chen Moore and Associates designed stormwater, water main, and roadway improvements for the City of Miami Beach Sunset Islands 1 & 2 neighborhood. As part of the proposed stormwater and drainage services, extensive analysis was conducted utilizing ICPR Modeling and GIS to meet and/or exceed required storm water Level of Service standards. The proposed storm water design included the introduction of catch basins, exfiltration trench and stormwater piping to effectively collect stormwater, provide water quality treatment and route the stormwater to existing overflow outfalls to Biscayne Bay. As part of the project, an existing condition assessment of the existing outfalls was conducted and rehabilitation and upsizing of the existing outfalls as required was proposed. This stormwater project due to its outfall to Biscayne Bay required extensive permitting coordination with Miami-Dade County DERM, South Florida Water Management District and the US Army Corps of Engineers. Miami Gardens NW 191st Street Drainage )ImprOvements. Chen Moore and Associates (CMA) was asked by the City of Miami Gardens to design the stormwater improvements for the residential area from NW 9th Avenue to NW 10th Place and from NW 191st Street to NW 193rd Street. The design had a total construction budget of over $400,000 per a grant received by the City. CMA evaluated the existing site conditions to strategically design roadway, drainage and sidewalk improvements to meet the most critical needs of the City and maximize the value of their construction budget. The design considered elements related to the pedestrian paths and parallel parking adjacent to Norland High School. The project scope included government permitting, bidding services and construction administration to support the efforts of City staff. Marathon MS4 Permitting. Chen Moore and Associates provided consulting engineering services for the submittal of the FDEP NPDES MS4 annual report for the City of Marathon. CMA also worked with the City to obtain the renewal of the MS4 permitting for the current cycle which included development of best management practice goals, developing public informational brochures, updating the City's current storm water ordinance to reflect current regulations and coordinating supplemental information with the permitting agencies. Monterra Development University Drive Improvements. The Chen Moore Team designed a new right turn lane and bus bay from University Drive (FDOT SR 817) into the future entrance to the Town Center component of the Monterra Development in Cooper City (north of Sheridan Street). The project required the design and construction of two - 9 foot box culverts (approximately 120 LF), the demolition and relocation of +/- 2,000 LF of water main from Davie Utilities and doubled the width of +/- 2,000 LF of the existing Central Broward Water Control District (CBWCD) canal along University Drive. Coordination efforts were conducted with the CBWCD, Town of Davie Engineering, Town of Davie Fire Marshall, Town of Davie Utilities, Cooper City Utilities, Broward County and the Florida Department of Transportation. The project was completed simultaneously with the University Drive Canal Expansion Project. Chen Moore and Associates' services included roadway, drainage, earthwork and utility design; government permitting; conducting public bidding for the Monterra Community Development District (CDD); construction observation and closeout services. Village of Pinecrest Suncrest Dr & Moss Ranch Rd Drainage Analysis. Chen Moore and Associates worked with the Village of Pinecrest to review existing conditions and evaluate the existing stormwater Level of Service (LOS) within the Suncrest Drive & Moss Ranch Road area due to resident concerns. CMA conducted an analysis of the area, proVided recommendations for drainage improvements to meet Village LOS standards, and provided full design, permitting and construction document preparation services. As part of the project, CMA also assisted the Village in conducting public information meetings, bidding the project, evaluating the bids received and providing periodic site observations during construction. www.chenmoore.com CH~RE "'j &ASSOClATIS Oscar R. Bello, PE Senior Engineer Education Bachelor of Science, Civil Engineering, University of Central Florida, 1999 Registration Professional Engineer, Florida, 61612, 2004 Professional Affiliations . American Public Works Association . American Society of Civil Engineers . Environmental Coalition of Miami and the Beaches . Florida Engineering Society . National Society of Professional Engineers Certifications Nuclear Density Gauge Certification Level I Survey Technician )summary Mr. Bello has more than 12 years of experience in planning, design, permitting, and construction management of water, wastewater, and drainage municipal projects in Florida. Mr. Bello has worked as a project manager and project engineer for various projects in South and Central Florida. He currently manages municipal projects for the City of Miami Beach, City of Dania Beach, Florida Keys Aqueduct Authority and the City of Key West. Project Experience Miami Beach - South Pointe Phase III/IV IV - ROW Improvement Project. Chen Moore and Associates is the prime consultant and is responsible for providing surveying, planning, geotechnical investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and inspection services for infrastructure improvements within the public right of way areas of the South Pointe III/IV/V neighborhood of Miami Beach. The project encompasses approximately 19,000 LF of ROW infrastructure improvements including water main replacements, stormwater drainage improvements, paving & grading, streetscaping enhancements, landscaping improvements, lighting improvements, and roadway reconstruction. This project also required extensive coordination with the public, adjacent CRAs, historic districts and various regulatory agencies. As part of the proposed stormwater and drainage services, extensive analysis was conducted utilizing ICPR Modeling and GIS to meet and/or exceed required stormwater Level of Services standards. The proposed stormwater design included the introduction of catch basins and stormwater piping to effectively collect and route the storm water to sixteen drainage gravity wells and a stormwater pump station with overflow outfall connections to Biscayne Bay. Due to the environmental sensitivity of Biscayne Bay design and implementation of water quality treatment measures was an important consideration and design factor of the system prior to outfall to the Bay and was closely coordinated with regulatory agencies during the permitting process. Dania Beach - NW 1st Ave WaterlStormwater. Chen Moore and Associates was selected by the City of Dania Beach for the NW 1st Ave project, which includes replacing existing water main and providing drainage improvements. The project area is commercial, where many existing utilities including gas main, sanitary sewer, fiber-optic cables and other AT&T / Bellsouth utilities are located. Therefore the placement of the exfiltration trench and new water main was a challenge in this small one way road. Approximately 1400 linear feet of 12" water main as well as 700 linear feet of exfiltration trench have been designed and is currently within the permitting phase. www.chenmoore.com CH~RE ) &ASSOCIATES Miami Beach Sunset Islands 1 & 2. Chen Moore and Associates designed stormwater, water main, and roadway improvements for the City of Miami Beach Sunset Islands 1 & 2 neighborhood. As part of the proposed storm water and drainage services, extensive analysis was conducted utilizing ICPR Modeling and GIS to meet and/or exceed required storm water Level of Service standards. The proposed stormwater design included the introduction of catch basins, exfiltration trench and stormwater piping to effectively collect stormwater, provide water quality treatment and route the stormwater to existing overflow outfalls to Biscayne Bay. As part of the project, an existing condition assessment of the existing outfalls was conducted and rehabilitation and upsizing of the existing outfalls as required was proposed. This stormwater project due to its outfall to Biscayne Bay required extensive permitting coordination with Miami-Dade County DERM, South Florida Water Management District and the US Army Corps of Engineers. Miami-Dade County Pine Shores Drainage )Improvement Project. Chen Moore & Associates provided engineering design services for the Pine Shores Drainage Improvement Project. Chen Moore and Associates analyzed the existing drainage systems and designed a system to handle the 5 year - 1 day storm event. Miami Beach City Center Right of Way Improvement Project. Chen Moore and Associates is the prime consultant and was responsible for providing surveying, planning, geotechnical investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and inspection services for infrastructure improvements within the public right of way areas of the City Center neighborhood of Miami Beach. The project encompasses approximately 24,000 LF of ROW infrastructure improvements including water main replacements, sanitary sewer upgrades, stormwater drainage improvements, paving & grading, streetscaping enhancements, landscaping improvements, lighting improvements, and roadway reconstruction. This project also required extensive coordination with the Public, adjacent CRAs, historic districts and various regulatory agencies. As part of the proposed stormwater and drainage services, extensive analysis was conducted utilizing ICPR Modeling and GIS to meet and/or exceed required stormwater Level of Services standards. The proposed stormwater design included the introduction of catch basins and storm water piping to effectively collect and route the stormwater to 16 drainage gravity wells with overflow outfall to Dade Canal. Water quality treatment was an important consideration and design factor of the system to ensure that appropriate treatment was provided prior to discharge to the gravity wells and outfalls. Village of Pinecrest SW 104th Street Drainage Improvements. Chen Moore and Associates was contracted by the Village of Pinecrest to provide design and permitting related services to address drainage concerns along the north side of SW 104th Street at the intersection with SW 77th Avenue. Proposed drainage improvements included drainage structures and exfiltration trench within the public right of way to address the drainage problem. North Miami Beach NE 168th Street Roadway Improvements. Chen Moore and Associates provided consulting engineering services for the NE 168 Street (between NE 18 Avenue and NE 19 Avenue) and NE 18 Avenue (between NE 168 Street and NE 169 Street) right of way improvements. The scope of the project included addressing drainage concerns, providing new curbing and street paving, replacing/adding sidewalks, providing new paved parking areas which were gravel, and providing landscaping areas for future plantings to be completed by the City. www.chenmoore.com CHeRE ) &ASSOCIATES Meghan T Wells, EIT, LEED AP Associate Engineer Education Bachelor of Science, Architectural Engineering, University of Miami, 2009 Registration Engineer In Training, Florida, 100206954, 200S Professional Affiliations . American Society of Civil Engineers Certifications LEED AP Summary Ms. Wells serves as an Associate Civil Engineer for Chen Moore and Associates. She is a graduate from the University of Miami where she served as the President of the American Society of Civil Engineers (ASCE) Student Chapter. She became Chen Moore and )Associates' first LEED Accredited Professional while she was an intern in August of 200S. Her experience includes roadway design, stormwater modeling/design, GIS, permitting, storm water master plans and coordination of grant funding. Project Experience North Miami Beach NE 18th Ave Between NE 167th & 168th Streets. Chen Moore and Associates provided consulting engineering services for the NE lSth Avenue between NE 167 th Street and NE 16Sth Street right of way improvements. The scope of the project included addressing drainage concerns, providing new curbing and street paving, replacing/adding sidewalks, providing new paved parking areas which were gravel, and providing landscaping areas for future plantings to be completed by the City. Miami Lakes Lake Patricia Roadway & Drainage Improvements. Chen Moore and Associates is implementing drainage improvements identified on the most recent Town of Miami Lakes Stormwater Master Plan for approximately one square mile of an existing residential neighborhood near Lake Patricia in southern Miami Lakes near Ludlam Road. Services include utility coordination, schematic and final design phases, government permitting, bidding assistance, construction administration and statements of work completion. The final design included approximately 1,900 LF of exfiltration trench and rehabilitation/upsizing of 6 existing outfalls. CMA is also assisting Miami Lakes with the acquisition of potential grant opportunities for funding the construction of the proposed improvements. Miami Gardens NW 191st Street Drainage Improvements. Chen Moore and Associates (CMA) was asked by the City of Miami Gardens to design the stormwater improvements for the residential area from NW 9th Avenue to NW 10th Place and from NW 191st Street to NW 193rd Street. The design had a total construction budget of over $400,000 per a grant received by the City. CMA evaluated the existing site conditions to strategically design roadway, drainage and sidewalk improvements to meet the most critical needs of the City and maximize the value of their construction budget. The design considered elements related to the pedestrian paths and parallel parking adjacent to Norland High School. The project scope included government permitting, bidding services and construction administration to support the efforts of City staff. Fort Lauderdale-Hollywood International Airport Stormwater Master Plan Update. Chen Moore and Associates worked on the Stormwater Master Plan update for the Fort Lauderdale-Hollywood International Airport. This project included gathering all existing information available from previous permits, reports and studies and confirming their accuracy for use in the existing conditions model; preparing the existing conditions model www.chenmoore.com .. CHe.RE ) MSSOCIATES with Interconnected Pond Routing Software; and working with Broward County Environmental Protection Division and the South Florida Water Management District to confirm that the modeled flood stages and peak discharges match the levels in previously issued permits. In addition, Chen Moore and Associates prepared the "future conditions" model based on the airport master plan; submitted for a conceptual stormwater management permit from Broward County EPD and SFWMD; and worked with the consulting engineers for the new south runway to submit for a construction permit. 1 I I Hollywood Stormwater Master Plan Update. Chen Moore and Associates reviewed the analysis from the previous Stormwater Master Plan for the City of Hollywood, which was completed in 2004, and prepared the update to the Plan with new topographic and system data along with recent drainage improvements projects. Chen Moore and Associates also updated the ICPR storm water model for the entire City limits to )allow the City to assess the performance of various alternatives for drainage system improvements. Chen Moore and Associates used the stormwater model to estimate whether the system improvements would meet level-of- service criteria for various storm events. During the completion of this project, Chen Moore and Associates was responsible for analyzing the performance of various system improvement alternatives, providing system improvement recommendations with associated cost considerations, and providing design guidelines for new development. Village of Pinecrest SW 72 Ct-SW 112 St to SW 116 St Drainage Analysis. Chen Moore and Associates worked with the Village of Pinecrest to review existing conditions and evaluate the existing stormwater Level of Service (LOS) within the SW 72nd Court from SW 112th Street to SW 116 Street residential neighborhood due to resident concerns. CMA conducted an analysis of the area including review of existing topographic data, soils information and drainage system conditions reports of the existing system including existing drainage structures and outfalls to the South Florida Water Management District Canal. CMA provided recommendations for improvements to meet Village LOS standards Marathon MS4 Permitting. Chen Moore and Associates provided consulting engineering services for the submittal of the FDEP NPDES MS4 annual report for the City of Marathon. CMA also worked with the City to obtain the renewal of the MS4 permitting for the current cycle which included development of best management practice goals, developing public informational brochures, updating the City's current stormwater ordinance to reflect current regulations and coordinating supplemental information with the permitting agencies. Monterra Development University Drive Improvements. The Chen Moore Team designed a new right turn lane and bus bay from University Drive (FDOT SR 817) into the future entrance to the Town Center component of the Monterra Development in Cooper City (north of Sheridan Street). The project required the design and construction of two - 9 foot box culverts (approximately 120 LF), the demolition and relocation of +/- 2,000 LF of water main from Davie Utilities and doubled the width of +/- 2,000 LF of the existing Central Broward Water Control District (CBWCD) canal along University Drive. Coordination efforts were conducted with the CBWCD, Town of Davie Engineering, Town of Davie Fire Marshall, Town of Davie Utilities, Cooper City Utilities, Broward County and the Florida Department of Transportation. The project was completed simultaneously with the University Drive Canal Expansion Project. Chen Moore and Associates' services included roadway, drainage, earthwork and utility design; government permitting; conducting publiC bidding for the Monterra Community Development District (CDD); construction observation and closeout services. www.chenmoore.com CHeRE ) &ASSOCIATES Marlon D John Engineering Inspector Education Master of Science, Construction Administration, Florida International University, 2009 Bachelor of Arts, Business Administration, Park University, 2002 Bachelor of Arts, Human Resources, Park University, 2002 Registration N/A Professional Affiliations N/A Certifications MOT Workzone Traffic Control: Intermediate Level Workzone Traffic Control. Nuclear Density Gauge Asphalt Paving Technician Level 2 \Asphalt Paving Technician Level 1 JEarthwork Construction Inspection Level 2 Earthwork Construction Inspection Level 1 Consultant CEI Project Manager Training Radiation Safety Officer Training Occupational Safety and Health Administration Construction Safety and Health Qualified Storm Water Management Inspector Nuclear Density Gauge Certification (Troxler) Summary Mr. John has his Masters in Construction Management from Florida International University. As an Engineering Inspector for Chen Moore and Associates, he is responsible for testing and inspections on various types of projects including neighborhood improvement, water/wastewater and storm water projects throughout Florida. He has been involved in projects which total over $40 million in construction value. These projects include various projects for Miami Beach, Pinecrest, North Miami Beach and the Monterra Development as well as the Dania Beach Neighborhood Improvement Projects, Broadview Park Neighborhood Improvement Project, the St. George East and Broadview Park portions of the Central County Neighborhood Improvement project. Project Experience Broward County St. George East. The Central County Neighborhood Improvement Project (CCNIP) is the second of three neighborhood infrastructure improvements projects carried out by Broward County in the unincorporated areas. The project included improvements to the drainage, water, sewer, and roadway systems. Chen Moore and Associates was selected to be the design engineer for one third of the project sites, including the Franklin Park, Washington Park, St. George West and East neighborhood areas. Chen Moore and Associates was also part of a team of engineers that completed the basis of design report (BODR), and served as the project reviewer that made recommendations resulting in substantial savings to the project's budget. The St. George East Portion of the project, which is located SE of Sunrise Boulevard and NW 31st Avenue involved the installation of water and sewer improvements, along with paving and drainage improvements, landscaping and entry features. The project was completed on time and on budget and included emergency change orders related to Hurricane Clean-Up and approximately 2 miles of 20" Water Main in FDOT ROW. Miami Beach City Center Right of Way Improvement Project. Chen Moore and Associates is the prime consultant and was responsible for providing surveying, planning, geotechnical investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and inspection services for infrastructure improvements within the public right of way areas of the City Center neighborhood of Miami Beach. The project encompasses approximately 24,000 LF of ROW infrastructure improvements including water main replacements, sanitary www.chenmoore.com CH~RE ) &ASSOCIATES sewer upgrades, storm water drainage improvements, paving & grading, streetscaping enhancements, landscaping improvements, lighting improvements, and roadway reconstruction. This project also required extensive coordination with the Public, adjacent CRAs, historic districts and various regulatory agencies. As part of the proposed storm water and drainage services, extensive analysis was conducted utilizing ICPR Modeling and GIS to meet and/or exceed required storm water Level of Services standards. The proposed stormwater design included the introduction of catch basins and stormwater piping to effectively collect and route the stormwater to 16 drainage gravity wells with overflow outfall to Dade Canal. Water quality treatment was an important consideration and design factor of the system to ensure that appropriate treatment was provided prior to discharge to the gravity wells and outfalls. Village of Pinecrest SW 79th Avenue )ROadWay Improvements. Chen Moore and Associates provided professional engineering services for the planning, design, and permitting of the roadway improvements to SW 79th Avenue and SW 112th Street, including the reconfiguration of SW 79th Avenue between SW 110th Street and SW 112th Street, the construction of a right turn lane extension from SW 112th Street onto US-1, and the construction of drainage improvements to alleviate flooding concerns along the project roadways. The reconfiguration of SW 79th Avenue included the conversion of an existing bidirectional roadway into a one-way roadway and the construction of new sidewalk, curb and gutter, and a parallel parking lane along the west side of the roadway. Monterra Development Solano Avenue Roadway Design and Construction Administration. Chen Moore and Associates designed an over half-mile long roadway that connects Sheridan Street and University Drive, mixed-use residential areas and the Town Center component of the Monterra Development in Cooper City. Solano Avenue was designed to create a relationship between the mixed-use residential, Town Center, pedestrian walkways, parallel parking and green spaces to promote walkability, social interaction and give the area a sense of community. This required a variance to reduce and relocate the required berm along the property frontage to the roadways. Chen Moore and Associates' services included roadway, drainage, earthwork and utility design; government permitting including PMUD rezoning; conducting public bidding for the Monterra Community Development District (CDD); construction observation and closeout services. Monterra Development University Drive Improvements. The Chen Moore Team designed a new right turn lane and bus bay from University Drive (FDOT SR 817) into the future entrance to the Town Center component of the Monterra Development in Cooper City (north of Sheridan Street). The project required the design and construction of two - 9 foot box culverts (approximately 120 LF), the demolition and relocation of +/- 2,000 LF of water main from Davie Utilities and doubled the width of +/- 2,000 LF of the existing Central Broward Water Control District (CBWCD) canal along University Drive. Coordination efforts were conducted with the CBWCD, Town of Davie Engineering, Town of Davie Fire Marshall, Town of Davie Utilities, Cooper City Utilities, Broward County and the Florida Department of Transportation. The project was completed simultaneously with the University Drive Canal Expansion Project. Chen Moore and Associates' services included roadway, drainage, earthwork and utility design; government permitting; conducting public bidding for the Monterra Community Development District (CDD); construction observation and closeout services. www.chenmoore.com ..... . Richard C. Wohlfarth, P.E. Principall Director of Engineering ) FORMAL EDUCATION: PROFESSIONAL EXPERIENCE: University of Florida, Gainesville, Florida Bachelor of Science, Civil engineering PROFESSIONAL REGISTRA TlONS: Registered Engineer- State or Florida .50853 Registered Building Inspltdor- State or Florida BN ~580 smccl i1e528 ACI Level 1 ft91175 UBCI ....~OFESSIONAL rFILlA TIONS: Florida Engin8ering Society "Past Chapter President National Society of Professional Engineers REFERENCES: Carmo Engineering 228 east Ocean Avenue Lantana, Florida 33462 Mr. Dave Canna 561-58e-1111 Calvin Giordano & Assoc. 1800 Eller Drive, Ste. 600 Ft. Lauderdale, Florida 33316 Mr. Don 'Mndham 954-921-7781 Florida Keys Aqueduct Authority 1100 Kennedy Drive " ~y West, Florida I :. Jim Reynolds 305-2M-245<4 Mr. 'M>hlfarth, p.e. is the Director of the Englne.ring Department which includes professional and technical personnel. He also has overall responsibility for the Special Inspection, Construction Materials Testing and Geotechnical Engineering Divisions where he directs training, quality system review and personnel evaluations. His responsibilities include report rltvlew, signing and sltlllng geotechnical enginttering, structural inspection and laboratory tlsting reports for the company, providing contract negotiltion and administration, budget estimating and projed management. Mr. 'M>hlfarth has 22 years of experience (15 with NEF) in various aspects of geotechnical engineering which Include dotennining feasibility of site development, foundation design analysis and recommendations, providing engineering evaluation for bridge and roadway construction, pavement design for roadways, roadway subgrade stabilization by geotextiles and other means, design of shoring systems for utility trenches and other deep excavations, dewatering methodology for trench and other excavations and backfill procedures, setting up and monitoring pile load tests, and providing value engineering for foundations. Mr. VVohlfarth served as Project Engineer for the FOOT Broward Boulevardfl-95 f1yover ramps and access improvements to the Tri-Rail systltm, which included three new bridges. Additional project experience includes being the Project Engineer for the FOOT roadway widening and Turnpike improvements at Tamiami Trail. This particular project included three new bridges and over three miles of roadway improvements. PROJECT EXPERIENCE: . City of Hollywood: multiple ongoing projects, including Decorative Wall along Boardwalk, Surf Road waterf sewer lines, bus shelters, Pubfic Works Facility . City of Delray Beach: Atlantic Avenue improvements- 1-95 to NW 1 ih Avenue, east of 1-95 north and south side of Atlantic Avenue; new piping, paver brick! pacer sidewalks, decorative street lamps, landscaping, curb extensions to define where parallel parking is along the street and widening the sidewalks. Converted the signalized intersections at 12th, 10th and 8th Avenue to trombontt mast arms. . Galloway Road ~ening- 4 mile span, Miami (FOOT) . Various projects for the Broward County Board of Commissioners- Qualification Based Contract (since 1988) and Miami Dad. County Board of Commissioners- Qualification Based Contract (since 2000)- Environmental Assessments, Gl!totechnical Exploration" Engineering, Material Testing, Structural Inspections . Various K-12 Schools - Broward, Dade, Palm Beach, Martin, Indian River County Districts- new classroom & administration buildings, athletic facUities, fields, related concessions, additions, cafeterias, associated parking, roadways, sidewalks, lighting, drainage evaluations, I.tnvlronmental assessments on potential sites. . Miami Beach City Center R.O.W. Infrastructure Improvements: replacement of 40,00 I.f. of 3-12 inch diamoterwater mains, ra-milling of roadways, installation of streetscapes inc. curbing, islands, lighting, parallel par1dng r9!;~ \. CsTONER & ASSOCIATES, Inc. "~ SURVEYORS - MAPPERS I ..,~''o '<:"~-. James D. Stoner, P.S.M. President Professional Profile Mr. Stoner is a second generation land surveyor, with over 35 years of surveying experience in South Florida. He began his surveying career at Williams, Hatfield, & Stoner, Inc., working from the bottom all the way up to Vice President of the Surveying Department. Mr. Stoner founded Stoner & Associates, Inc. in 1988, based on the philosophy that attention to detail and quality work would create a successful firm. He has managed all aspects of the firm's growth and development. Mr. Stoner has supervised both small and large scale surveying projects. His firm has successfully completed numerous roadway projects, while working directly with the Department and its consultants. Education Land Surveying Palm Beach Community College in 1979 Professional Registrations State of Florida Professional Surveyor and Mapper License Number LS4039 www.stonersurveyors.com 4341 S. W 62nd Avenue, Davie, FL 33314 T: (954) 585-0997 F: (954) 585-3927 ) Page 2 of 2 February 24, 2011 Professional Affiliations Florida Surveying and Mapping Society Florida Surveying and Mapping Society - Broward Chapter American Congress on Surveying and Mapping Leadership Broward \ , Page 2 of 2 ) 1 I , 4. Approach / Methodology Chen Moore and Associates has over 25 years of experience in providing consulting civil engineering, environmental engineering, landscape architecture and planning services for local public sector clients throughout the state of Florida. Utilizing our extensive experience on similar street and drainage projects with public sector clients in Miami-Dade County including projects for the Town of Miami Lakes, the City of Miami Gardens, the City of North Miami Beach, the City of Miami Beach, the Village of Pinecrest and Miami Dade County we have developed proven, efficient, cost effective methods to deliver projects to our clients on time and within budget. We work as an extension of our clients as a trusted advisor familiar with the technical aspects of a project, the regulatory/permitting requirements and in consideration and communication with all stakeholders involved to ensure a successful project on time and within budget. We ensure that our clients remain well informed throughout the process with frequent communication and regular project updates and also that our staff is accessible to handle any client needs that arise throughout the project. The following details the approach that CMA intends to utilize for the successful completion of this project for the City of Sunny Isles Beach. Project Scope In the undertaking of any project, CMA understands the need to provide innovative and sustainable solutions on time and within budget. Paramount in achieving a successful project on time and within budget is to clearly define the scope and goals of the current project. In defining the scope of the project, the following are some of the factors that will be considered: . Project goals, timeline and budget . Any unique characteristics and considerations (resident/hotline complaint logs, special characteristics, etc.) . Existing available information (available utility atlases, as-builts, operating reports, etc.) . Additional information that will need to be obtained (survey, geotechnical studies, traffic studies, etc.) . Potential impacts of construction to: parking, bus routes, emergency access and vehicular flow; pedestrian routes; community events; existing utilities; etc. . Project stakeholders (affected residents, HOAs, public agencies, etc.) . Regulatory authorities having jurisdiction and permitting agencies . Project funding . Construction requirements and limitations At the outset of the project it is necessary to clearly define the scope of the project and the project goals for all concerned parties to ensure the successful completion of the project. Existing Site Assessment & Planning In preparation of this proposal, CMA has already completed a number of existing site assessment tasks for this project to become familiar with the project area. Additionally, these completed initial tasks will result in time savings to the project and to the City of Sunny Isles Beach as we have procured the following information and are ready to implement it into the proposed project: -) ./ \ , . Utility atlases and/or as-built information CMA has requested a locate design ticket, is already aware of existing utilities within the project area and has requested available utility atlases and/or as built information for the following utilities: Water - Water service is provided by the City of North Miami Beach Utilities. Water mains are 12" in size and are approximately located on the North side of the project area. Sewer - Sewer service is provided by Miami Dade Water and Sewer Department. Gravity sewer mains 12" and 15" in size are located approximately at the centerline of the right-of-way. AT&T - Existing AT&T utility lines exist within the project area along with utility cabinets located on the north side of the project area. FPL - Existing FPL underground utility lines exist within the project area along with utility cabinets located on the north side of the project area. Hotwire - Received confirmation that Hotwire has no conflicting utilities within the project area. TECO - Forwarded information to obtain existing utility information to coordinate proposed improvements. City of Sunny Isles Beach Stormwater - Existing stormwater inlets, pipes and outfalls exist within the project area. FOOT Stormwater - Existing stormwater inlets and pipes exist within the project area along the connection of Collins Avenue with NE 174 Street. Miami-Dade County Public Works - Existing traffic signals and control boxes exist within the project area near the intersection of Collins Avenue with NE 174 Street. City of Sunny Isles Beach Street Lighting - Existing street lighting and electrical wiring is located within the project area. . Existing available topographic information CMA has utilized existing available UDAR data to review elevation data within the project area. A preliminary assessment of the UDAR data completed to identify low elevation points and general runoff characteristics of the project area. . Existing property/parcel information CMA has utilized existing available GIS parcel and County data to obtain existing property/parcel data. Existing parcels are illustrated in above preliminary GIS map. . Soil data/geotechnical reports CMA has coordinated with our geotechnical subconsultants and County staff regarding general subsurface conditions in the area including general exfiltration rate values for preliminary evaluation of proposed solutions. ~ ~ ..}~. City of Sunny Isles Beach NE 174 Street Drainage Analysis Figure 3 location Map '"2" . Aerial photograph CMA has reviewed existing aerial photographs of the project area and noted: the proximity of available outfall locations, existing outfall locations; existing above ground utilities to be coordinated; existing area property developments; existing landscaping/trees that will need to be coordinated for the implementation of the proposed project; existing traffic control of the project area; etc. ) 1 I I . Site specific field visit CMA has conducted a site specific field visit of the project area. Example items noted during the field visit performed and requiring coordination and review in project design and construction include: Existing outfall located at South End of North Bay Drive Existing stormwater structures and above ground utilities Existing general development including multi-family residential buildings locations and entrances Existing low elevations holding standing water Existing trees and landscaping Existing Bus Transit routes Existing speed bumps Additional streetscape components to be considered along the corridor such as areas to address current ADA code requirements; current pavement marking and signage code requirements; pedestrian crosswalk requirements; implementation of traffic calming measures, etc. . Additional information Upon successful section of CMA by the City to provide the proposed services, the existing site assessment and planning phase services of the project already conducted above may be supplemented by the following available or specifically requested --:'iI information: Existing available survey information to be reviewed and utilized in preparing a project specific survey under this project. Existing available soils/geotechnical reports to be reviewed and utilized in preparing site specific geotechnical testing under this project. Existing environmental reports Videotape of existing drainage system to evaluate/assess existing condition Local concerns/reports/general knowledge regarding the proposed project (i.e., speak with City staff and/or residents and/or business owners regarding reports of stormwater ponding/poor drainage conditions) Available traffic studies, traffic counts, turning movements, accident reports, etc. Available equipment/operation and maintenance reports and manuals (i.e., maintenance schedules, etc.) Proposed work/developments within the project area for coordination Existing master plans, drainage/utility master plans, capital improvement plans, etc. Existing permits, regulatory authorizations, permit conditions The existing available data can be obtained from a variety of sources including the City itself, utility owners, regulatory agencies, other government agencies and available published data. In addition to reviewing existing available information, CMA will conduct a project-specific site visit to identify features that may not have been identified in existing documentation and to review existing conditions as they exist today. Based on a site visit and review of existing data, CMA can supplement the existing data with only the required additional information, thereby providing an efficient and cost effective existing conditions analysis of the project area. Additional information that is typically requested includes additional survey data and site-specific geotechnical information, which would be provided by our subconsultants. , Stormwater Modeling It is often necessary to model existing and/or proposed conditions as part of a drainage project during the design phase of the project. CMA is familiar with various modeling programs and software. Typical software and programs implemented include: AutoCAD Civil 3D ICPR by Streamline Technologies Storm CAD Microsoft Excel SWMM Cascade GIS analysis and tools CMA first uses GIS analysis to create a three dimensional model of the existing ground surface within the project area to identify the points of high elevation that create the drainage basins and the low-lying areas where ponding could occur during rainfall events. StormCAD is used to estimate the flow conditions within utility pipe networks and to size the utility components to handle the existing and/or future flows. We can utilize the three dimensional model of the existing ground surface to calculate proper cover for utility pipes and to create utility profiles based on slope and minimum invert requirements. StormCAD is also used to calculate friction losses and size pipes for various flow scenarios. As such, the plan and profiles for underground utilities can be designed and laid out with the assistance of our modeling software. CMA also utilizes our software for an additional check of possible utility conflicts and to determine where pipes must be offset. Due to our extensive experience with projects similar to NE 174th Street, we are the best prepared firm for this project. CMA has conducted a preliminary three dimensional modeling to analyze the NE 174th Street project area. The project area has elevations ranging from 3.75' to 7.75' (NGVD 29). As shown in Figure 1: Drainage Basin with UDAR Data to the right, there are low-lying areas susceptible to ponding during rainfall events near the eastern side of the complex curve and on the western boundary of the project area near North Bay Road. Based on our preliminary review, CMA would propose additional drainage structures along with exfiltration trench for water quality treatment and an outfall to the existing canal located south of the project area to provide drainage improvements to meet the City's Level of Service standard in this area. This will require coordination of a Class I Permit with Miami-Dade PERA, an Environmental Resource Permit (ERP) through South Florida Water Management District (SFWMD) and construction along North Bay Road. :' , II ' , , i /' I. I.-Il1! 't '.' .~ ~ ,a\, ",. l~\, .~ ~P, '_ ._ I _ b 'i! l '" \ Jl >'.. I:^,", ' - ~ "-~-;.' City of Sunny Isles Beach NE 174 Street Drainage Analysis Figure 1: Drainage Basin with lIDAR Data CK!:M From our preliminary information, there is an existing outfall located along North Bay Road. The size and condition of this outfall is unknown. Upon approval and further research, connection to the existing outfall may be a possible design alternative if there is adequate available capacity within the existing outfall system. The existing system including the outfall will need to be retrofitted with current design standards including pollution retardant baffles and manatee grates. If further evaluation supports utilizing the existing outfall system, a simplified regulatory permitting process can be expected resulting in time savings to the project. The installation of a gravity well was also reviewed during the preliminary analysis of proposed solutions. Since the groundwater table is located at 2.00' (NGVD 29) and the lowest crown of road elevation is at 4.75' (NGVD 29), limited head is available for discharge to a gravity well. Due to the limited head condition and the higher cost for the construction of a gravity well, the alternate solutions discussed above would be more cost effective and provide better value to the City, residents and other stakeholders. Upon approval and Notice to Proceed, we will finalize our design and submit for comments. Roadway Design CMA has extensive experience in the design of improvements to existing roadways. Our engineers are well versed in the latest Miami-Dade County Traffic Engineering Department (MDTED), Florida Department of Transportation (FOOT) and Federal Highway Administration (FHWA) Design Standards. We have recently successfully completed projects with municipalities such as City of Miami Beach, Town of Miami Lakes, Village of Pinecrest and City of Miami Gardens. From our site observations, traffic calming features have been implemented in the project area and additional traffic calming features may be reviewed. Additionally it was noted during our site observations that signing and striping components, ADA elements, pedestrian crosswalk elements should be a component of the project to meet current code requirements. Project Design Upon final review and analysis of existing conditions along with initial modeling efforts, alternatives can be developed for review with City of Sunny Isles Beach Staff and the Miami-Dade County Permitting, Environment and Regulatory Affairs (PERA formerly DERM) staff, as necessary, to achieve identified project goals. Based on initial analysis, proposed alternatives will be presented to the City of Sunny Isles Beach along with an estimated project budget, a time line to complete the project, and an achieved level-of-service goal. In addition, CMA will identify the constraints of the proposed options. CMA will review the proposed alternatives with City staff, answer any questions/concerns raised by the City, and receive City input to identify the best solution to achieve the project goals. Once the best alternative is identified, CMA will develop proposed project plans and bidding documents to construct the proposed project. As part of the project design, CMA utilizes the latest available software to develop construction documents. The Chen Moore team typically implements the latest versions of AutoCAD, AutoCAD Civil 3D, GIS and Microsoft Office programs to develop construction plans and contract documents. Having worked almost exclusively with public clients, the Chen Moore team has a proven ability to accurately and expeditiously handle the project delivery method of a public client, most of which are quite similar, as most procurement is part of State statutes. Another important part of the project design is the project cost estimate. CMA uses two main methods for determining accurate unit prices in order to arrive at an accurate cost estimate. The first method is to consult with the construction management staff to determine the current bidding climate. The second method is to consult with other public sources, such as various municipal and county purchasing websites, to follow patterns in the bidding of other similar projects. ) ) Permitting For any construction project, permits and required regulatory agency approvals from authorities having jurisdiction are required. Since the approval of permit applications can define the schedule of a project, CMA researches the needs and time frames for permits as far in advance as possible. Typical agencies that may have jurisdiction on a proposed project within the City of Sunny Isles Beach for roadway and drainage projects are listed below: . Miami-Dade County Permitting, Environment and Regulatory Affairs (PERA formerly DERM) . Miami-Dade County Public Works Department . Miami-Dade County Traffic Engineering Department . South Florida Water Management District . Florida Department of Environmental Protection . Florida Department of Transportation . US Army Corps of Engineers \ I CMA is based in Miami-Dade, Palm Beach and Broward Counties and performs most of its work within the Tri-County Area. As such, our familiarity with the regulatory agencies goes beyond the norm and has grown to a successful, first-name-basis relationship. Coordination Coordination is another aspect of the project that will start at the very beginning. Through experience, CMA has learned that a project can only be successful when open lines of communication exist between the Engineer and the City, the public, various agencies, services and other consultants. Only by working together can every stakeholder feel that their individual experience contributed to the successful completion of the project. Coordination with the City When a project commences, the Chen Moore Project Manager establishes communication with the City through regular phone and email correspondence. This practice is continued through the duration of the project in order to ensure a successful project. Our project manager's have experience leading project progress meetings, briefing elected officials, participating in construction meetings, meeting with regulatory agencies and speaking at public meetings involving citizens and residents. CMA is also available to attend City Commission meetings upon request. Construction Administration The in-house construction engineering inspectors at CMA are backed up by years of experience and the assistance of the engineers assigned to the project. The Chen Moore Team is very familiar with the entire bidding process. Recent experience involved large construction contracts going to bid as part of the Miami Beach Capital Improvement Projects and Broward County Neighborhood Improvement Projects. However, in many instances, smaller contracts were processed for various projects in municipalities throughout South Florida such as the City of Miami Gardens and the Village of Pinecrest. At many different capacities, the Chen Moore team can administer all the bid process needs of the City of Sunny Isles Beach. (ii..--..'.. ~' "'~". ...., "'b'#~' .-.,'.'!I -. City of Sunny Isles Beach NE 174 Street Drainage Analysis Figure 2: Existing Drainage Structures CH~M Depending upon the specific needs of each project, the Chen Moore Team will make construction inspectors available full-time, or available at critical junctures in the project process, for certification and testing. It is essential during construction to have ongoing communication between the Client, Contractor, Consultant and Community. One important aspect of clarification is between the community and the client. This cannot be overlooked. The construction phase is when most residents and/or business owners notice changes occurring, along with disruptions. It is during this time that most residents start paying more attention to the actual changes taking place. It is extremely important to keep an ongoing dialogue with the residents to explain why certain aspects were designed as they were and what the overall benefits will eventually be. The Chen Moore team also realizes that even with the best planning, pre-investigation, design and communication, changes can occur during construction. The most effective way of dealing with changes is to try to anticipate them, provide alternative solutions quickly, which are acceptable to both Client and Contractor, and negotiate with both entities to minimize additional costs. Often times, changes can be made on site without the need for the change order process. CMA has built a reputation of administering projects in a way which minimizes change orders and the costs associated with them. r'" c_:':c_~_;:~.:-::;;;:-.:_ _~::. ~) 1 1 I 5. References ) \ , ) City of North Miami Beach, Florida OFFICE OF CITY ENGINEER / CAPITAL IMPROVEMENT PROJECTS Mark Spanioli, P.E. Director of Engineering and Construction City of Miami Community Redevelopment Agency 49 NW 5th Street. Suite 100 Miami, Florida 33128 RE: General Engineering Services North Miami Beach, FL Design Start Date: January 200 I Design Completion Date: On-going To Whom It May Concern: I would like to take this opportunity to express my gratitude for the exemplary services provided by the Chen Moore and Associates team that contributed to the success of various right-of-way projects in North Miami Beach, Florida. \ Chen Moore and Associates has been working with the City of North Miami Beach sinee 2001. They have been responsible for the design and permitting of several civil engineering projects throughout the City. The City of North Miami Beach can always rely on Chen Moore and Associates for. their professionalism, honesty and commitment to quality With any project they rcceiv,e. With this said, I hereby recommend Chen Moore and Associates to provide engineering services to City of Miami. They would be a great asset to your project. Respectfully submitted, b1' City Engineer 17050 N.E. 19th Avenue. North Miami Beach, Florida 33162' Telephone: (305) 948-2967. Fax: (305) 957-3502 ) ~ /\!\,li\/\/\IBEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachn.gov CAPITAL IMPROVEMENT PROJECTS OFFICE Tel: 305-673-7071, Fax: 305-673-7073 April 1 g, 2011 . HMarK Spariioli, P.E. Director of Engineering and Construction City of Miami Community Redevelopment Agency 49 NW 5tb Street, Suite 100 Miami, Florida 33128 RE: South Pointe Phases 3, 4 & 5 Right-of-Way Improvement Project Miami Beach, FL Design Start Date: January 2004 Design Completion Date: June 2010 To Whom It May Concern: I would like to take this opportunity to express our gratitude for the exemplary engineering services provided by the Chen and Associates team that contributed to the successful planning, design, permitting, bid, award and construction administration of the South Pointe Phases 3, 4, & 5 Right-of-Way Improvement Project in Miami Beach, Florida. The Project Scope of Work includes improvements to the stormwater collection and disposal system, including construction of twenty-one (21) gravity wells and pump station, water distribution system, lighting, roadway reconstruction, roadway milling and resurfacing, signage and pavement markings, landscaping, and irrigation. The City of Miami Beach can always rely of Chen and Associates for their professionalism, honesty and commitment to quality with any project they receive. With this said, I hereby recommend Chen and Associates to provide engineering services to City of Miami, they would be a great asset to your City project. ~UllY~.d. ~ Capital Project Coordinator ..... cc:.-- ..'FernandoVazquez;CIP Director- ___ Oscar Bello, Chen Moore and Associates File We are committed fa providing exc.el/ent public serAce and safety to 0/1 who live, wor.~, and pfay in our vibront, tropical, hislor;c communi/yo ) ----':J, --=-=~.[ VILLAGE OF PINECREST r----- ..'. ... -..-...----.. .__hn_....___..__.._..._...._ --.'-.C ----..- I r, DEPARTMENT OF PUBLIC WORKS rt PINECREST .1;::I__11::"."'A. Daniel F. Moretti PublIC Works D;({~c1or April 26, 2011 Mr. Mark Spanioli, P.E. Director of Engineering and Construction City of Miami Community Redcvelopment Agency 49 NW 5'h Strect, Suite 100 Miami, Florida 33128 t RE: Various Stormwater & Rights of Way Improvement Projects Village of Pineerest, Florida Design Start Date: November 2005 Design Completion Date: Ongoing Mr. Spanioli: I would like to take this oPPOltunity to express our gratitude for the exemplary services provided by the Chen Moore and Associates team that contributed to the success of various stolmwater and drainage improvements and sidewalk projects for the Village of Pineerest. Chen Moore and Associates has provided stonnwater and drainage improvement and sidewalk improvement design services for the Village of Pinecrest since 2005. Chen Moore and Associates has completed the design for 15 projects for the Village and designed more than 2 y, miles of sidewalk expansion for the Village through Pineerest and the City of Coral Gables. The Village of Pinecrest has always been able to rely on Chen Moore and Associates with any project they have received. Based on the work completed by Chen Moore and Associates for thc Village of Pinecrest, [ hereby recommend Chen Moore and Associates to provide engineering and landscape architecture serviecs to the City of Miami Community Redevelopment Agency. They would be a great asset to any of your projects. mitted, 10800 Red Road Pinecrest, Florida 33156 1305.669.6916 1305.669.6919 I '. publicworks@pinecrest.lI.gov 6. Office Locations Chen Moore and Associates has its corporate headquarters in Fort Lauderdale, with additional ) branch offices in Miami, West Palm Beach, Stuart and Gainesville. Our local office responsible for RFQ# 11-11-02 to provide Civil Engineering Services to Design Street and Drainage Improvements for the City of Sunny Isles Beach is: 1444 Biscayne Boulevard, Suite 204 Miami, FL 33132 Telephone: (786) 497-1500 Fax: (786) 497-2300 Point of Contact: Jose Acosta, P.E. Our central locale enables on-staff professionals to develop innovative, yet practical designs based on special insights into the problems and requirements of the communities of which they are a part. By living and working in these communities, Chen Moore and Associates' engineering professionals are able to work closely with their clients. Our additional office locations are below. Broward Office (Corporate headquarters) 500 West Cypress Creek Road, Suite 410 Fort Lauderdale, FL 33309 Telephone: (954) 730-0707 Fax: (954) 730-2030 Point of Contact: Peter Moore, P.E., LEED AP Palm Beach Office 500 Australian Avenue South, Suite 710 West Palm Beach, FL 33401 Telephone: (561) 746-6900 Fax: (561) 746-8333 Point of Contact: James Barton, P.E., LEED AP Gainesville Office 14 East University Ave, Suite 206 Gainesville, FL 32601 Telephone: (352) 374-1997 Fax: (352) 244-0875 Point of Contact: Jason Haeseler, P.E. Stuart Office 510 SE Dixie Highway Stuart, FL 34994 Telephone: (772) 919-7018 Fax: (772) 919-7019 Point of Contact: Cristobal Betancourt, RLA 1 I I '\ I ) W",tPilmk.lchOtfM:. FortlalMn1lIeOfic. . .,.P"'- ---" I I I 7. Contract Forms ) ') ,I '~1" L SECTION 6 BID SUBMITTAL FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID Addendum #1, Dated November 14,2011 Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: o NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID FIRM NAME: DATE: December 1, 2011 eter Moore, P:E., LEED AP, President AUTHORIZED SIGNATURE: City of Sunny Isles Belch I Request for Qualifications No. 11-11-<12 I. CHeRE I-.,\~~()(I,\ I'" IUD No.II-II-(}l Civil fl1gineering Sen'ices tn Design.'it n'l'I 1//Illl)millllge III/IJffJl'l'IIIl'l/ls 7-2 ) .' -, C' ., jo BID SUBMITTAL FORM Bid Title: CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of Sunny Isles Beach in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. The Proposers accepts all of the terms and conditions of the Advertisement or Request for Qualifications and Instructions to Proposers, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within ten days after the date of the City's Notice of Award. In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that: The Proposer has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposers to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and/or Notice to Proceed. City of Sunny Isles Beach I Request for Qualifications No. 11-11-02 CHORE &ASSOCIATl'S lifO No.lI-tl-lll Civil !:lIljil1eeril1lj Serl'ires to /Jesiljll Streetl1l1d /Jrailll1lje l/1/fJro\lrlnents 7.3 ') '11.'./'t~'.~... '\~ or Firm Name: Chen Moore and Associates 1444 Biscavne Boulevard. Suite 204 Miami. FL 33132 Street Address: .Same Mailing Address (If different): l Telephone No. (786) 497-1500 Emall Address:jacosta@chenmoore.com Fax No. (786) 497-2300 FEIN No. ~J...};f!.J])J.;~~~ [ I I .. "By signIng thIs Signature: Print Name: Title: THE EXECUTION OF THIS FORM CONSTlTVTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE nRMS OF m PROPOSAL FAILURE TO SIGN THIS SOUaTAnON WHERE INDICATED ABOVE BY AN AUTHORIZED ~'RESENTAT1VE SHAU RENDER THE PROPOSAL NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN m SOLE DISCRE110N, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCAUY BINDS THE PROPOseR TO THE TERMS Of ITS OPPEft. City of Sunny Isles Beach I Request for Qualifications No. 11-11-02 I t. I CHeRE ",\~~()n\ II'~ /If() No.II-IHll CMI !:lJljil1eeril1lj Serl'irl's 10 DesiglJ Street (l1/(( IJrailJ(I!/f Im{JfIIl'fll1l'1/l.\ 7-4 ) I I I 1 I I I NON-COLLUSION AFFIDAVIT City of Sunny Isles Beach 18070 Collins Avenue Sunny I sles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 STATE OF FLORIDA COUNTY OF Broward The undersigned being first duly sworn as provided by law, deposes, and says: This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of, Chen Moore and Associates (Name of Corporation, Partnership, Individual, etc.) a. Corporation (Type of Business) Florida (State) , formed under the laws of of which he is President (Sole Owner, Partner, President. elc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph10.2.has not colluded, Conspired, connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put In a sham Bid, or that such person;firm.or corporation, shall refrain from Bidding, and has not in any manner. directly or indirectly,sought by ag'reemeht or collusion. or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids or any oiher proposers; a-Ad all statements cOntained Iii the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 1 r/'2' ~as Ireetly or indireell submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to any: ber or agent t eor. Peter Moore, P.E., LEED AP President NAME AFFIANT'S TITLE , TAKEN. SWORN AND SUBSCRIBED TO BEFORE ME this ~ day of December .2011 Personally Known X or Produced Identification Type of identification (Affix seal here) 'f', ~. NOl~/I.~ NO ARY P BLIC (name printed or typed) NOTARYPunriC~ST^TE OF FLORIDA (i""'''- r.ei~h Barron { j CoDloUsSlon#EE098032 ""'.n......Explres: JUNE 06, 2015 BONDED nolU ATLA....i/C nO/il)lImco.,!Ne. DeCEMBER 26, 2010 CHeRE &A550CIATl:S 1 of 7 111'0 No. 11-11-01 Civil /.'l1lji/ll'erilllj SI'rl'irl's (n f)l'si!lll S( reel (//1(/ Draill(/ljl' IlI1prOl'ell1l'11ls 7-5 ) 1 I I I I I I I PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach. FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to City of Sunny Isles Beach by Peter Moore, P.E.. LEED AP President lpnnt IndiVIduals name and title] for Chen Moore and Associates [pnnt name of enllty submlttln9 sworn statement] whose business address is: 1444 Biscayne Boulevard, Suite 204 Miami, FL 33132 and (if applicable) its Federal Employer Identification number (FEIN) is 59-2739866 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: .) 11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1 )(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere. 11.4. I understand that an "affiliate" as defined in Para. 287.133(1 )(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair 2 of 7 DECEMBER 28, 2010 CHeRE &ASSOCIATl'S lira No.II-II-{)l CMI /.'nljineerinlj .len/ices 10 /Jesiljl1 Slree( and /Jrain(lljl' Improvements 7-6 ) market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 11.5. I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity, 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) x Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. I I The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF" CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. By: Sworn to and subscribed before me this ~ day of December , 20--1L, by (AFFIX NOTARY STAMP HERE) ,NOTARY PUBLIC-STATE OF FLORIDA ..,'''''",_ 'Leigh Barron .(W) Co~m1ss1on , EE098032 .,~$ ExpireS: JlJNE 06, 2015 BOlmID TBRU ATLANTlC80NDINGco,D(c' .-- .' .' . Signature: Nc;J!:Z Public --( ~Ioridal\.. r.:.r-- :::..... kbv \.I~( Print or Type Commissioned Name Personally Known x OR Produced Identification Type of Identification Produced 10/1998 3017 CHeRE W\SSOCIJ\IES. /If() NII./I-11-01 Cil'iI !:IH}illl'rril/lj Serl'il es I II /Jes;ljll SI rail/lid fJrailll/ljc 1/ll{lflll'C/IIeIIls 7-7 ) EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY I AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: Title: Peter Moor, Firm: President Address: 1444 Biscayne Boulevard, Suite 204 Miami, FL 33132 \ ! DecEMBER 28, 2010 CH_RE MSSUCIAI~S " ':.' 04 017 1110 NII.II-l/-Ii1 eMf /:ngineerinij SerJ'j(('S 1(1 {)('sigll SIIPI'll/nd {)minllij(' l/IIpfIJl1el1ll'IIIS 7-8 ) CONFLICT OF INTEREST City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTY OF Broward BEFORE ME, the undersigned authority, personally appeared Peter Moore, P.E., LEED AP deposes, and states: . who was duly sworn, of and principal office in 18.1. I am rhf'n MoorE) ,'Inn AsSOr.iiltf'S the President with a local office in Miami RFQ 18.2. The .above namedentltv Is submitting a 'tmt for the City of Sunny Isles Beach, .e.i& No. 11-11-02 described as: Civil Entln..rrnl; Servl... 10 O"l&n 51.... and orarnagefhe Affiant has madEldiligent inquiry and provides the information contained in this 111'''''''''.&1''''1'''-40 Affidavit based upon his. own knowledge. RFQ 18.3 The Affiant states that only one submittal for the above-etd is being submitted and that the above named entity has no financial interest in other entities submitting -BTds for the same project. RFQs 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above RFQ This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 18.5 Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor anyone associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 18.7 I certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 18.81 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. Dated this Oiet of interest is identified in the provision of services, I, on behalf of the above named entity, will of Sunny Isles B December , 2011 Peter Moore. P.L LEEDAP. President Print or Type Name and Title AFFIANT Sworn to and ubscribed before me this ~ day of December , 2011 10 Pers nally Known x OR LJ Prod cad Identification ; Type of )~enliflcation. <tLr ~ NOTARY PUBLIC STATE OF FLORIDA N6TARYPUBI.tC.srATEO~FLOlUDA ""'''''''';. Leigh Barron {W \ Coinmisslon # EEO?8032 \'flilliExpires:JUNE 06,2015 n~EDTmU ^Ti~~'TIC !lONDING ca, me. DECEMBER 28. 2010 CHeRE M$SOC1AI~S 50f7 IIrIJ No./I-1I-1I1 Cillil f.'lIljilleerillg Senire.\ to f)eSi!lIl.l'lft'ellll/tI /Jroilll/ljl' IllIflrtll'fl1ll'l1ls 7.9 l ) DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No". If you answer "Yes", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your Firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO x 19.2. Has your Firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO x 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? \ I YES NO x If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. December 1, 2011 Date Peter Moore, P.E., LEED AP, President Print or Type Name and Title DEcEMseR 29. 2010 CHeRE MSSU(IAI~S 60f7 Ilro No. 11.11-111 Civil !:lIljillrerin!} ServiU's to /Jesiljll SireI'I lIlII! IJfllil1l1!}I' {IJlIJfllmlleJJls 7.10 ) ANTI-KICKBACK City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947.0606 Fax: (305) 949-3113 ANTI-KICKBACK AFFIDAVIT STATE OF FLORIDA ) ) COUNTY OF Broward ) 1 I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. By: Peter Moore,P.E., LEED AP Title: President The foregoing instrument December , 20-.lL, by of person], as President Chen Moore and Associates executed]. was acknowledged before me this 2:.-- day of Peter Moore, P.E., LEED AP [name [type of authority], for [name of party on behalf of whom instrument was NOTARY PUBLIC.STATE OF FLORIDA ~~,'Ulr',#,~ Leigh Barron ~ ~ j Co~mission II EE098032 ....""...... Expires: JUNE 06, 2015 BONDED THRU ATLA.\iIC RONDING CO., INC. (; ;j~,-:r_r"_, ~ Notary Public - State of Florida \.e..:-~ (;l:,Vr'<;r' Print or . ype Commissioned Name. AFFIX NOTARY STAMP HERE: Personally Known x OR Produced Identification Type of Identification Produced CU.:E &ASSOClAlI'S 7 of 7 /lro ;\'o.//-II'(}l til'il J:lIljilll'l'rilllj Serl'irl's 10 f)1'Siljll .II/HI 1I11t! f)ra;II(1lje IIII{lflIl'I'lI/enIS 7.11