My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sustainable Restoration
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-01-01 Restroom Structural Beam Restoration
>
Responses
>
Sustainable Restoration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 9:25:04 AM
Creation date
2/8/2012 9:24:32 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Restroom Structural Beam Restoration
Bid No. (xx-xx-xx)
12-01-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~~ <br />Sustaillll'l5re Res'ttwation <br />~~~~r <br />~.v " <br />CGC #1515891 <br /> <br />February 1,2012 <br /> <br />Attn.: Sunny Isles Public Works <br />Bathroom Beam Spalling <br /> <br />Restroom Structural Beam Restoration <br />Request for Proposal No. 12-01-01 <br /> <br />Dear Sunny Isles Beach, <br /> <br />We are pleased to submit our proposal based on the conditions that were visually inspected on <br />site. <br /> <br />4.2.1 MINIMUM REQUIREMENTS <br /> <br />. Please see attached State of Florida General Contractors license. <br />. Sustainable Restoration, Inc meets the requirement of 5 recent municipal projects: <br />I. City of North Miami Beach- Structural Repairs at Balcony damaged by Garbage <br />dumpsters.- In this Project we coordinated with the Public Works depatiment of <br />NOlih Miami Beach, the owners of the unit, and the property management <br />Company. <br />2. City of Miami- Downtown Miami Partnership- Tomorrow Land Gallery- In this <br />Project we performed concrete Restoration, repairs, metal framing, and installed <br />new walls. This was a public/private patinership and work was coordinated <br />between the downtown Miami palinership, the city of Miami, and the building <br />owner. <br />3. City of Miami- Miami Community Redevelopment Association- LegalArt <br />Building- Worked with the city of Miami, the CRA, and the building owners in <br />order to perform concrete Restoration on a historic building, install two new <br />staircases, and install a new elevator shaft. <br />4. City of Miami Dade- Camillus House Good Shephard Villas- Duplex <br />remodelling. Structural Tie-downs were installed, impact rated Windows and <br />doors were installed. This grant funded job required coordination the city of <br />Miami-Dade and Camillus house. <br />5. City of Miami Beach- Historic City Hall- was the principal Project manager for <br />this historic buildout, retrofit. This award winning job required coordination <br />between the City of Miami Beach and all subcontractors. <br /> <br />Scope of Work: <br /> <br />Engineering Services: <br /> <br />1. Provide plans and specifications for the repairs at the restroom facility at Sunny Isles <br />Beach sealed by Florida Registered Professional Engineer. <br />2. Provide Special Inspection Services for the structural repairs at the restroom facility. <br />3. Provide Project log and final celiification letter to be recorded with the buidling <br />depatiment. <br /> <br />2235 SW 27th Terr Miami,FL 33133 Ph: 786-337-5006 Fax: 888-533-0913 <br />URL: http://flbuildgreen.com email: sustainablerestoration@gmail.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.