HomeMy WebLinkAboutCoastal Systems International, Inc.
CITY OF SUNNY ISLES BEACH- CIVIL ENGINEERING
SERVICES TO DESIGN STREET AND
DRAINAGE IMPROVEMENTS
RFQ No.: 11-11-02
Request for Qualifications
Prepared for:
City of Sunny Isles Beach
Sunny Isles Beach Government Center
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
COASTAL
Prepared by:
SYSTE\lS
On'.l!.ltlllATI0N_\L
Coastal Systems International, Inc.
464 South Dixie Highway
Coral Gables, FL 33146
ORIGINAL
December 2, 2011
COASTAL
COASTAL SYSTEMS INTERNATIONAL, INC.
464 South Dixie Highway. Coral Gables, Florida 33146
Tel: 305-661-3655. Fax: 305-661-1914
www.coastalsystemsint.com
.,._..-.-.-.-..-.............~...-.-_._....."'~_.-....~-~-.
I H ;~;; ,C;. t~; ;1 "V ;t-~, ,/) j
i ,
r l
I O;r- r ,-" ''it)'j"') !
-v . . LU ,
MP {O=/)'14'11'1
I City of Sunny Isles n,xK;h I
L-2.!~~~.~"'Jr!.5.__1
308000
..-
SYSTEMS
I NT r. R NA l"(()NA I.
December 2, 2011
CITY OF SUNNY ISLES BEACH
Sunny Isles Beach Government Center
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
RE: CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS
RFP No.: 11-11-02
Ladies and Gentlemen:
Coastal Systems International, Inc. (Coastal Systems) is pleased to submit the attached original and four
copies of our qualifications in response to the above-referenced contract. This Request for Qualifications
(RFQ) includes a summary of the team's experience with the requested types of site/civil projects and
key project team resumes.
)
Coastal Systems specializes in designing drainage for low-lying areas on barrier islands, having designed
stormwater management systems for over 50 public and private projects in Miami Beach. The firm
pioneered an outfall control structure design that is now a design standard for the City of Miami Beach
Public Works Department, and this outfall design has been successfully implemented for several Right-
of-Way Projects in the City of Miami Beach. The design and permitting of a high capacity outfall is
crucial to the success of this project in the City of Sunny Isles Beach.
Coastal Systems has an established working relationship with the City, having provided coastal
engineering services for the City in 2008 to evaluate beach erosion hot spots. We look forward to
continuing the working relationship to provide creative solutions to this drainage project. We are
available to meet and present our qualifications, and we encourage you to visit our website at
www.coastalsystemsint.com. Should you have any questions or require any additional information,
please do not hesitate to contact Mr. Andres Perez at aperez@coastalsystemsint.com or at (305) 661-
3655, extension 159 or me at tblankenship@coastalsystemsint.com or at (305) 661-3655, extension 130.
Timothy K. Blankenship, P.E.
Director of Engineering
Coastal, Environmental, Civil Engineering and Management
a
SYSTEMS
~
..-w Ardarmn & Associates, Inc. ([j) I
=.::.:..a.::.: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~. MltenasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQNo.:11-11-02
Page 2
')
1. COMPANY INFORMATION
.'
COASTAL SYSTEMS INTERNATIONAL, INC.
Civil Engineering and Environmental/Coastal Engineering/
Regulatory Permitting
SYSTEMS
INTERNATIONAL
Coastal Systems International, Inc. (Coastal Systems) has an
established reputation for providing solutions to complex projects
in coastal and waterfront environments. Incorporated in 1994,
Coastal Systems has extensive experience helping clients realize
their vision by providing cost-effective solutions in the design and
construction of Engineered Waterfront Environments. These
projects have been diverse and have included urban waterfront
revitalizations, moorings for the world's largest cruise ship, 1,000
slip marinas, and private island destinations. The firm offers
professional services in coastal, civil, waterfront/marinas and pOlt
engineering. In addition, the firm provides environmental and
regulatory permitting and site investigation services. Projects
have been completed throughout Florida, the Caribbean and
Central America.
CORPORATE OFFICE:
464 South Dixie Highway
Coral Gables, Florida 33146
Tel: 305-661-3655
Fax: 305-661-1914
REGIONAL OFFICE:
2047 Vista Parkway, Suite 101
West Palm Beach, Florida 33411
Tel: 561-640-1003
Fax: 561-640-1009
WEBSITE:
www.coastalsvstemsint.com
E-MAIL ADDRESS:
i ofo@coasIalsysIemsiol.com
Coastal Systems
understands the unique
requirements of
public sector projects.
Our professional design experience includes streetscape design,
public parks design and open spaces design. The civil engineering
team works closely with diverse project teams to provide civil
engineering services for site development. Paving, grading and
drainage design services are provided along with water and
sanitary sewer services. Working relationships are maintained
with state and local regulatory agencies with jurisdiction over
site/civil related projects to facilitate plans approval pursuant to
the stringent regulations. Coastal Systems is uniquely organized
with engineering and regulatory permitting staff in-house to
address environmental resource protection measures and permits
that are required as palt of a comprehensive design approach.
)
The company maintains a diversified staff of 30+ individuals,
including Project Managers, Engineers, Biologists and Surveyors.
The team is dedicated to serving clients with a multi-disciplined
approach, while ensuring a personalized service. A truly
international mix, the staffrepresents 10 countries with fluency in
more than seven foreign languages.
Coastal Systems has worked for the City of Sunny Isles (City)
having provided Coastal Engineering services to evaluated
erosion "hot- spots" along the shoreline. In addition, Coastal
Systems has worked on over ten private development projects in
Sunny Isles over the last 1 0 years.
Corporate Office: 464 SOUlh Dixie Highway. Cornl Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Patkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
..\'ww.coastalsvstemsint.come infoC'Q)coastalsystemsint.com
--.. Ardaman & Associates, Inc. ([j) I
~ C'ellochicaJ. EnvirCXlTerla ad HAD 0 N N E
~. MltenasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 3
")
.... .. Ardaman & Associates, Inc.
, Geolechnical. Environmental and
Malerials Consullants
ARDAMAN & ASSOCIATES, INC. - Sun CONSUL T ANT
Geotechnical Engineering
CORPORATE OFFICE:
8008 South Orange Avenue
Orlando, Florida 32809
Tel: 407-855-3860
Fax: 407-859-8121
Ardaman is a professional corporation founded in 1959 by Dr.
M.E. Ardaman, and the company has continually provided
services in the practice of engineering. The company was founded
in Orlando, but expanded to meet the needs of their client
community throughout Florida and Louisiana. Ardaman currently
serve from their corporate headquarters in Orlando, 11 branch
offices in Florida, and 2 branch offices in Louisiana. At present,
Ardaman employs a staff of nearly 500 professional engineers,
scientists, technicians, drilling personnel, technical assistants and
support staff.
REGIONAL OFFICE:
2608 West 84th St. Hialeah,
Florida 33016
Tel: 305-825-2683
Fax: 305-825-2686
WEBSITE:
www.ardaman.com
Ardaman is a technically superior and fiscally sound consulting
firm that has experienced a steady and healthy growth throughout
its history. This reasonable growth pattern has allowed the firm to
expand services offered to our clients while maintaining top
quality. The firm believes that the growth and reputation of our
company are the direct results of the individual efforts and
commitment of all their employees. The firm's future success
depends on continuing this commitment and adhering to the
highest professional standards and ideals. Ardaman offers a broad
range of professional engineering services including:
)
. Geotechnical engineering
. Construction materials testing and inspection
. Hydrogeology and surface water hydrology
. Geoenvironmental sciences
. Building inspection
. Industrial waste engineering
. Facilities and roofing engineering
For this contract, Ardaman will perform any required soil borings
and percolation test.
CorporJte Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305.661-3655 . Fax: 305.661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
WWW..coastalsvstemsint.comeinfo@coastalsystemsint.com
~.
~~
SYSTEMS
~
~ Ardarran & Associates, Inc. ([j) I
=.::.:..a.::.: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
---. Mltenas CorIsUtarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 4
-)
([j) I HADONNE
HADONNE CORPORA nON - SUB CONSUL T ANT
Land Surveyors/Mappers
CORPORATE OFFICE:
1985 N.W. 88 Court, Suite 202,
Doral, Florida 33172
Tel: 305-226-1188
Fax: 305-207-6845
Hadonne Corp., celebrating its lOth year, is a responsive,
professional, hi-tech, multi-disciplinary Survey Firm. Hadonne
specializes in four related professional disciplines: Surveying,
Mapping, GIS and Subsurface Utility Engineering (SUE). By
providing these discipline's Hadonne offers the client an all-
inclusive Survey Firm eliminating the problem of dealing with
multiple firms for their needs.
WEBSITE:
www.hadonne.com
Hadonne provides accurate data collection, on time and within
budget. Hadonne's success is based on its core principle "Satisfy
our client". By being responsive, providing expelt service and
always communicating, Hadonne has built an impressive
reputation in the industry.
)
Hadonne is celtified under categories 15.01 and 15.03 as a
Disadvantage Business Enterprise (DBE), Community Business
Enterprise (CBE) with Miami Dade County and also certified
with the Florida Department of TranspOItation (FDOT) as Group
8 Surveying and Mapping firm.
Hadonne will be responsible for all Right-of-Way and
topographic surveying as well as subsurfacing utility location
services under this contract.
Implementation of Services
After notice to proceed, the Coastal Systems team would proceed
immediately with field surveying and the initial phases of service.
Litigation Summary
Coastal Systems does not have any outstanding litigation that
would threaten the viability of the firm or the performance of this
contract.
Proof of Insurance
Enclosed on the following page is a copy of Coastal Systems
Certificate of Insurance.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561.640-1003. Fax: 561-640-1009
www.coastalsvstemsint.com.info@>coastalsystemsint.com
.COA~::':L .
-
-\ .~.
, \
SYSTEMS
~
.".... Ardarmn & Associates, Inc.
~ C'roochicaJ. EnvirCXlTerla ad
~. MltenasCorlsUlarts
([j) I HADONNE
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 5
)
.---..,
ACORD'
~
CERTIFICATE OF LIABILITY INSURANCE
OPID:JT
DATE (MMIDDNYYY)
01/17/11
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT, If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement s .
PRODUCER
Tanenbaum Harber of Florida
2900 SW 149th Avenue
Miramar, FL 33027-6605
Pat Murphy
954-883-2900
954-517.7400
FAX
~~
INSURED
Coastal Systems International
Vanessa Russi-Machado
464 S. Dixie Highway
Coral Gables, FL 33146
CUSTOMER 10', COAST-1
INSURERj!)~OROING COVERAGE
INSURERA, Hartford Underwriters Ins. Co.
INSURERe ,Hartford Casualt Insurance Co
INSURER C :
INSURER 0 :
INSURER E :
INSURER F :
~#
'30104
114397
I
I
)
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER,
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS.
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
Ir~R L mr POLICY NUMBER ; ~8Mgh-~~Y ~gf6~}y~~~ I
I EACH OCCURRENCE
I MA ~D
21 SBMIG4745 PREMISES ,Eaoce"",n,,)
J MEO EXP (Anyone person)
I
B
LIMITS
PERSONAL & ADY-INJURY
1,000,00
300,00
10,00
1,000,00
2,000,00
2,000,00
1,000,00
,21 UECIN8962
i
I
I
I
01120/11 I 01/20/12
I GENERAL AGGREGAT~_ S
I PROOUCTS. tQMPIOP AGG I S-
lEmp Ben. I ,
COMBINED SiNGLE LIMIT I <
(Ea accident) . ..
BODilY INJURY (Per person) ! $
A
DEOUCTIBlE
X I RETENTION' 10 000
WORKERS COMPENSATION
I At~O EMPLOYERS' LIABILITY Y I N
ANY PROPRIETORIPARTNERlEXECUTlVE n
PJ:~~~~~~EI~~EH~ EXCLUDED? L-J
tfyes, describe uoder
DESCRIPTION OF OPERATIONS below
,
121SBMIG4745
BOOll Y INJURY (Per acCident) $
I PROPERTY DJ..W.AGE
(Per acciaenl)
I
B
I
I
i
',,,.\
I
01/20111
3,000,00
3,000,00
DESCRIPTION OF OPERATIONS J LOCATIONS IVEHICLES (A"8th ACORD 101, Atldltlonal Remarks Schedule, II more space Is required,
PROOF OF INSURANCE
FOR INFORMATIONAL PURPOSES ONLY
CERTIFICATE HOLDER
I COASYS1
Coastal Systems International,
Inc.
FOR INFORMATIONS PURPOSES ONLY
464 S. Dixie Highway
Coral Gables" FL 33146
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRA TION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
~ ~ J.J. ;/ttwyf:p
Af"nOn ?J::. t?noaIr\O\
@1988-2009ACORDCORPORATION. All rights reserved.
ThA .ll.l":.nRn n::l;melo :Inn Innn ~rp, rp.oi~hm~=!rt marks of ACORD
Corporate Office, 464 South Dixie Highway. Coral Gables, Florida 33146. Tel, 305-661-3655 . Fa" 305.661-1914
Regional Office, 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411 . Tel, 561-640-1003 . Fa" 561-640-1009
www.coastalsvstemsint.comeinfo@coastalsystemsint.com
)
a
SYSTEMS
~
--- Ardarmn & Associates, Inc. ([j) I
=~ C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
--. Mltenas CorIsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 6
2. QUALIFICATIONS
._~
M"
\
}
~
Miami Beach Standard Tideflex
Outfall Structure
The Coastal Systems engineering team works closely with diverse
project teams to provide engineering services for site development
and Right-of-Way projects. Paving, grading and drainage design
services are provided along with water and sanitary sewer services.
Working relationships are also maintained with state and local
regulatory agencies to facilitate plan compliance with applicable
codes and regulations. Coastal Systems is uniquely organized with
engineering and permitting staff in-house to address environmental
resource and coastal constlUction permits that may be required.
The best civil works project is the one you do not notice because it
functions smoothly and seamlessly with the surrounding
environment. The Coastal Systems team has a proven track record
in completing high quality infrastructure improvement projects
that include paving, grading, drainage, water and sewer, landscape
and related elements. The Coastal Systems team uses a variety of
tools to ensure a positive experience for the various user groups as
well as minimization of client costs and maintenance issues. Our
dedication to open lines of communication and proven project
management strategies reduces the amount of client oversight
required and streamlines all phases of project implementation
including production of plans, securing permits, and facilitating the
bid and construction phase of the process.
Barrier island stormwater management design is a unique,
specialty consulting service provided by Coastal Systems. With
in-house civil/coastal/waterfront engineers, the team is
experienced in designing challenging drainage systems on Miami-
Dade County's barrier islands for both private and public sector
clients. Coastal Systems has completed over 10 Right-of-Way
paving/grading/drainage design projects for the nearby City of
Miami Beach with similar groundwater and elevation conditions as
Sunny Isles Beach. All of these projects required a combination of
drainage systems common in South Florida, including drainage
wells, exfiltration trenches, and outfalls to Biscayne Bay.
Coastal Systems pioneered a unique outfall structure that is now a
standard for the City of Miami Beach as shown in the graphic on
this page. This structure incorporates a Tideflex valve that is fully
serviceable within a concrete drainage structure. Due to local tidal
conditions, the outfall elevation is critical for the performance of
the drainage system, and the Tideflex valve prevents the influx of
bay water into the storm drains.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305.661-1914
Regiooal Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.com.info@coastalsystemsint.com
~\_L~.
~~
SYSTEMS
~
...... ArcIarmn & Associates, Inc. ([j) I
:=.a= C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ MltenasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 7
)
Several of these structures designed and permitted by Coastal
Systems have been installed in Miami Beach, and this same design
approach will be applied by Coastal Systems for the City of Sunny
Isles Beach on this project. The hydraulic performance of the
proposed outfall for this project is critical to hydraulic
performance of the new drainage system, and Coastal Systems has
extensive experience permitting the outfall through the County's
Class 2 Permit program administered by PERA (f.k.a. DERM).
, J
- -~=;
~. --~J
_== \.._::..11',
<M t",,=-,
I
Coastal Systems has designed over 50 drainage wells for public
and private clients in Miami Beach and other areas of Southeast
Florida. These wells have been gravity wells, and Coastal Systems
understands the unique requirements for the successful
performance of these wells. Coastal Systems is not a proponent of
pressure-injected drainage wells, and does not believe these types
of wells are the proper approach for this project. Some gravity
wells may be suitable for this application, however ideally the use
of the outfall would be optimized to minimize the cost and the
additional permitting through the DEP for drainage wells.
)
p.~
The following is a line-by-line response to the scope of work
outlined in the RFP:
Miami Beach Standard Tideflex
Outfall Structure
Surveying - Coastal Systems will manage Haddon to provide the
required Right-of-Way topographic survey for the project. This
firm will also complete a subsmface utility location survey within
the project limits.
Design Calculations - Coastal Systems regularly prepares
drainage calculations in the standard format required by Miami-
Dade County and/or the South Florida Management District.
Hydrology and runoff calculations are completed, and the
treatment and conveyance designed accordingly. Coastal Systems
regularly prepares calculations for local drainage projects, so the
firm understands the requirements and limitations of the agencies
relati ve to each type of system.
Construction Plans and Specifications - Coastal Systems
prepares detailed construction plans based on the engineering
design and the required standards of the municipality and/or the
County. These are engineered plans, and the firm regularly
processes bid documents for municipal clients.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.com.info@coastalsystemsint.com
)
MiCOA::AL
~.~.
:.-- \ \ \
SYSTEMS
~
..,.. Ardarren & Associates, Inc. ([j) I
=.::.:..a.::.: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~. Mltenas CorIsUtarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 8
Coastal Systems'
organizational structure
is designed for efficiency,
cost-effectiveness,
design optimization, and high
production throughout all
phases of project
implementation.
)
Roadway Components - the design will maintain the crown
elevation and grading as much as possible, and the storm water
improvements will be primarily underground. Coastal Systems
has planned and designed roadway protection and restoration for a
variety of projects for municipalities including City of Miami
Beach, City of Dania Beach, and City of Miami. Pavement
restoration will be minimized, to the fullest extent possible, to
avoid costly pavement overlays.
Permitting - regulatory permitting specialists are on staff at
Coastal Systems and work closely with the engineering team to
confirm the agencies that have jurisdiction over the project. This
project will require an Environmental Resource Permit (ERP) for
the proposed drainage improvements. This permit is based on the
SFWMD guidelines, and this agency will likely have jurisdiction
unless Miami-Dade PERA will process the ERP under an
operating agreement with PERA. In addition, a Class 2 permit is
required from PERA for any proposed outfalls.
Easements - the design will be optimized to remain in the public
Right-of-Way, however if necessary Hadonne will provide the
easement surveys for Coastal Systems to prepare easement
documents. Coastal Systems will work closely with the City to
coordinate these easements with the propelty owners for the
required underground improvements.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305.661-3655. Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. \'(lest Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
\VWW .coastalsvstemsint.com. info@coastalsystemsint.com
.)
..... Ardarmn & Associates, Inc. ([j) I
=.::.:..a.::.: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ Mltenas CorIsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 9
SYSTEMS
~
Experience with Similar Projects
Coastal Systems has a broad range of capabilities specializing in civil engineering services throughout
South Florida. This experience includes the planning and design of urban, barrier island stormwater
management systems as summarized in the following pages.
)
Capri Southbeach Streetscape, Miami Beach, Florida
Coastal Systems provided streetscape design services to improve
the Right-of-Way for 16th Street and Lincoln TeITace street ends as
part of the Capri South Beach Project. Capri South Beach
encompasses three (3) distinctive buildings on nearly 500 feet of
watetfront on Biscayne Bay. The streetscape improvements
included decorative pavers along with parking, sidewalks and
landscaping to accommodate adjacent residences as part of the
overall neighborhood improvements.
Prior to construction of the streetscape, Coastal Systems designed
underground utilities. The Lincoln TeITace street end is
approximately 325 feet long and required the design of a 12-inch
water main extension. Similarly, the 16th Street extension is
approximately 400 feet long, and required an 8-inch water main
extension as well as the slip lining of an existing 8-inch sanitary
sewer line. Both street ends were low in elevation and adjacent to
the bay and presented challenges for the drainage design. Detailed
topographic surveys were obtained to determine the drainage area
for the Right-of-Way for use in the hydrology study. Several
options were evaluated and an inverted-crown configuration for
the street ends was selected. The drainage improvements included
the design of stormwater pumping stations connected to outfalls
with associated controls and structures.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305.661-3655. Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel, 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.com.info@?coastals}.stemsint.com
)
.COAS;:L ~C..
~, '.
\ '
, .
SYSTEMS
~
..". Ardarmn & Associates, Inc. ([j) I
=.::.:..a.::.: C'roochicaJ. Envircnrala ad HAD 0 N N E
~ rv'alenasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 1 0
)
~..
1:1, ..-.~'.
.,- .~
Capri Southbeach, Miami Beach, Florida
Capri South Beach encompasses three (3) distinctive buildings with
72 fully furnished residences on nearly 500 feet of spectacular Bay
frontage. Coastal Systems was part of the design team for the
redevelopment of this waterfront area of South Beach.
Site/civil engineering services were provided to design the paving,
grading stormwater management and Right-of-Way streetscape for
the 4-acre site. The stormwater management included the design
and permitting of three (3) drainage injection wells. Miami-Dade
DERM and NPDES permitting services were also provided. Coastal
Systems also designed the water and sanitary sewer services for the
site. Fire lines, potable water, and sanitary sewer lines were
coordinated with the MEP consultants for the three (3) buildings.
As part of the site development, Coastal Systems also designed and
permitted the waterfront improvements. These improvements
included approximately 500 linear feet of sheet pile bulkhead with a
concrete cap. The design was coordinated with the Baywalk
waterfront promenade. The bulkhead also provides access to the 14-
slip marina. Coastal Systems designed fixed timber docks suppOlted
by concrete piles along with marina utilities including shore power
pedestals, fire protection, and sewage pump-out systems.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146 . Tel: 305.661-3655 . Fax: 305.661-1914
Regional Office: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561.640.1003 . Fax: 56).640-1009
www.coastalsvstemsint.coOleinfCll@coastalsystemsint.com
~ )
Ii
SYSTEMS
~
..-:111 Ardarmn & Associates, Inc. ([j) I
=.::.:..a.::.: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ tv'alenasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 11
)
Bayfront Street Ends, Miami Beach, Florida
The City of Miami Beach secured funding from the Florida Inland
Navigation District (FIND) to improve waterfront areas at South
Shore Drive (Normandy Shores), 10th Street, 14th Street, Lincoln
Road and Island View Park. Coastal Systems designed and
permitted the bulkheads at all five (5) locations. Steel sheet piling
was specified to be installed directly in front of the existing
bulkheads to meet federal and state exemption criteria. The
cantilever design also avoided excavation behind the bulkhead
alignment.
Environmental resource permits and stormwater drainage permits
were processed with the U.S. Army Corps of Engineers, Florida
Department of Environmental Protection and Miami-Dade County
Department of Environmental Management (DERM). In addition,
street end improvements were designed for South Shore Dri ve, loth
Street and Lincoln Road to improve upland access to the waterfront.
Paving, grading, drainage, lighting and landscape/hardscape
improvements were also incorporated into the bulkhead
improvements. Island View Park was constructed in 2008 and
Lincoln Road construction was completed in June, 2011.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
.www.coastalsystemsint.com.info@coastalsystemsint.com
)
a
SYSTEMS
~
..... Ardarmn & Associates, Inc. ([j) I
---=----:..a.= C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~. MltenasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 1 2
)
South Pointe Park, Miami Beach, Florida
Coastal Systems provided civil engmeenng and
coastal/environmental permitting services as part of the multi-
disciplined design team lead by the landscape architectural firm
Hargreaves Associates. South Pointe Park is located at the
southern end of South Beach in Miami Beach. The park is
bounded by the oceanfront, Government Cut, and Biscayne Bay.
These coastal and waterfront environments present many
challenges, but the project also provided an opportunity to create
a unique park experience.
Coastal System designed the stormwater management for the 19-
acre site which included a system of drainage retention areas in
conjunction with deep water injection wells to prevent any runoff
into the bay and inlet. The drainage design was completed in
close coordination with the landscape architects to ensure the
design vision was maintained throughout the project. Potable
water and sanitary sewer services to the park were also designed.
Coastal Systems secured coastal construction and environmental
resource permits for the site from the Florida Department of
Environmental Protection (DEP). The permitting process required
extensive coordination with the design team to ensure compliance
for the planned park improvements with the stringent coastal and
environmental permitting requirements. Lighting plans were
processed for compliance with marine turtle protection
requirements. Coastal Systems provided civil construction
administration services and colosed out the environmental and
coastal construction permits.
Corporate Ollice: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
RegionalOllice: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561-640-1003. Fax: 561-640-1009
www.coastalsvstemsint.comeinfo@coastalsystemsint.com
-)
e
~~.
SYSTEMS
~
.... Ardarmn & Associates, Inc.
----=:..a.= C'roochicaJ. EnvirCXlTerla ad
--. Mllaias CorIsUlarts
([j) I HADONNE
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 1 3
)
,.;0:1 C{l
/ I
/.'." "ldii [- .
'~ ~;!i jlll~ii~ ~LJ'~~fJ~ ~ ~
"~l !lJ1'lJ~.III~
~1~~1.:J.; I' ' l...rl~
"nLt' . ud ;;:.~
-" l.;l - .i'.:~. r~
,....l".~, '0;
~ ---,
~
1826 Automatic Parking Garage, Miami Beach, Florida
Coastal Systems provided site/civil engineering services for the first
automated parking system for public use in the City of Miami
Beach. The automated system is from Boomerang Systems, and the
garage was designed by the architectural firm, ADD Inc. The
garage is nine (9) levels with 139 parking spaces including one (1)
underground level on a 50-foot X 195-foot lot. A four-story glass
retail component provides retail space as paIt of the garage.
Coastal Systems designed the stormwater management for the site
that included a drainage well, and the plans were processed through
Miami-Dade DepaItment of Environmental Resource Management
(DERM). In addition, water and sanitary sewer services were
designed for the site.
Permitting serVIces were provided for the Florida DepaItment of
TranspOltation (FDOT) Driveway Connection and Drainage
Permits for the site, and permits were processed through the City of
Miami Beach Public Works DepaItment.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640.1003 . Fax: 561-640-1009
wwv.'.coastalsvstemsint,com. infCX@coastalsystemsint.com
)
~ Ardarmn & Associates, lroc. ([j) I
=.::.:..a.::.: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ Mltaias CorIsUlarts
December 2,2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 14
r-
)
Jose Marti Gymnasium, Miami, Florida
Coastal Systems provided civil engineering services for the Jose
Malti Park as palt of the design team led by Zyscovich. These
services include the design of a drainage system for a I-acre site
located paltially below Interstate 95.
The design consisted of a drainage well to contain the stormwater
runoff from the new building/gymnasium. The remaining site
stormwater runoff was managed by using 38-linear feet of
exfiltration trench system and various dry retention areas. Paving,
grading and stormwater management plans were prepared, that
included Right-of-Way improvements for southwest 5th Street.
Coastal Systems also provided water and sewer design to service
the new building/gymnasium. The design included over 2,200
linear feet of 8-inch water main with fire, domestic and irrigation
service. A new 6-inch sanitary sewer line was connected to an
existing sanitary manhole to service the new building.
Construction administration services were also provided.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
'WV.'W .coastalsVSlemsint.come info@coastalsystemsint.com
.)
=
~.
SYSTEMS
~
.,.... Ardarren & Associates, Inc. ([j) I
~ C'roochicaJ. EnvirCXlTerla ad H A DO N N E
~. tv'atenasCorlsUtarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 1 5
r--
.
)
~::w.
l ~ ""-- .~
......
-
Little Haiti Cultural Center, Miami, Florida
Coastal Systems provided streetscape design to convert N.E. 59th
Terrace from a two-way road to a one-way road with street parking
on both sides. Improvements included accesses to businesses and
parking lots, grading of the street to provide proper drainage and
new striping and signage for the design. The improvements were
from N.E. 2nd Avenue to 115 feet beyond N.E. 3rd Avenue
(approximately 800 It). The design of N.E. 59th Terrace is part of
the Little Haiti Cultural Center project funded by the City of
Miami and designed by Zyscovich. Coastal Systems provided
water and sewer design for the Little Haiti Cultural Club, Theatre
and Parking Lots. The design consist of SOO If of 12" D.I.P. water
mains which includes, two fire line services, two domestic water
service connections, and three irrigation water services for the
parking lots. All services were designed with backflow preventers.
Additionally, new sanitary sewer connections were designed to
replace older lines. Coastal Systems designed drainage systems to
manage on-site stormwater runoff. The site drainage design
consists of over 700 If which includes an exfiltration trench system
connected by 27 drainage structures. The street drainage design
consists of 525 If of exfiltration trench connecting 10 drainage
structures. Additionally, the stormwater runoff was managed by
the design of a complex RetentionlDetention System using (6) 4S"
diameter HDPE (High Density Polyethylene) pipes, 70 feet in
length each discharging into the ground. This drain field is being
used as an individual component to drain the site/roof area of over
1 acre, on land with poor soil percolation. Coastal Systems
processed the water/sewer system permits through Miami-Dade
W ASD, and the stormwater plans through Miami-Dade DERM.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305.661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561.640-1003 . Fax: 561-640-1009
wv:w.coastalsvstemsint.come info@>coastalsystemsint.com
~)
~COAS:L.
_.' ..,"
--> -
SYSTEMS
~
..,.,. Ardarmn & Associates, Inc. ([j) I
=.::.:..a.::.: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ Mltenas CorIsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 1 6
........
'J7
~~,
J\-\\
)
I' ~..,,;~ ?~~1
. ~ -'~
4 ',. ,~"' f <
~
,,"'-
~.... ..,..
4-JJ
~~ .~
-;~~ ~
......
'"
-..; l~
, ,..., ::.-....
... ~
~ ~ .....~ ,.....
F~~ ~~ ~ :~' ..~ u
~~,.. IIiII , ~..~.:>,~._ ..' Ii' ... -"II"" ......
'~~~ - . ~ ..
",,","" '"' -- ~ ..
~ ..... )iI ...'
~~'.",u.o~
!J'r'l!Il~
...~
~
Quiet Waters, Deerfield Beach, Florida
Coastal Systems was contracted by Grubb & Ellis Management
Services to provide consulting engineering services related to the
evaluation of the existing drainage system at the Quiet Waters
Business Park. The project site is located on the northeast parcel of
land at the intersection of Powerline Road and N.E. loth Street, in
the City of Deerfield Beach, Florida. The parcel is approximately
45.69 acres with approximately 36.84 acres of impervious area,
approximately 2.89 acres of landscape area, and 5.87 acres of
retention areas which includes the retention pond.
The site experienced flooding of the loading dock areas during
rainfall events impacting business operations. Coastal System
conducted a study and provided the client with an engineering
report, permit plans to improve the drainage system, permit
modifications and construction administration services.
The major components of the design included a pump station to
handle all the rainwater from the impervious area capable of
discharging 4,500 gpm. This pump station eliminated flooding of
the industrial parking lot areas during rainfall events thereby
enhancing the commercial warehouse operations.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561-640.1003 . Fax: 561-640-1009
Vtww.coastalsvstemsint.come info@coastalsystemsint.com
'j
Ii,
SYSTEMS
~
---- Ardarmn & Associates, Inc. ([j) I
=.::.:..a.::.: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ MltenasCorlsUtarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 1 7
'I
III
'. i
.
'Y)tl ,
'~.._"--..~:.~! -.' :,-~, .
' 'l :;';1;'~ ..../:.. "'.'E...'~ ~,.
,"'- /."~'1''''''1*'' .;f~1'.,.:-, l.. ~-j>, :: '';',
I' ,. - .Ii,., .... > '. .. '~." ,
:.-" .....~,.1J -""r',,:._: '\ ~I-', "\, ~:I:'
',':'1&.:.f I' '.... . . ':. , . "
~. . ';;tJI..... \ -, I. _ .
" ;I' ~~ ~ ~.....' ""', i -'.r~l~i~h
'. ~.', - ,,- &il:jr= ii' -', ~ I ,'I ':,
,., ~t.... - --. ~.jj ,. '. ~<"r"lr."
.... :, ~'~"~-ou...l.. . ~ '~ . .:_~:.:-_
' I . .-~4. -" "'~".., _ ".:J..
~~ 'f'~-'~.'" . t~.r
~."1',\ , fo..
\ (.
.. :-
)
Miami Beach SoundScape Park, Miami Beach, Florida
Miami Beach SoundScape Park is designed to reflect the spirit and
vitality of Miami Beach; it is a unified expression of passive
recreation, pleasure and culture. A space that SUppOltS a multitude
of day and night uses, either under the shade of the trees or a starlit
sky. Combined with New World Center's expansive 7,000 square-
foot projection wall, the park established itself as a world-class
destination, marrying music, design and landscape.
Built on the site of a former parking lot, Miami Beach
SoundScape's design modified the existing topography to create
an unfolding, undulating sequence of spaces. Beyond the
functional role of providing adequate drainage, the topography,
combined with the circulation and planting, contributes
significantly to the character of the space and is intended to create
the feeling of a space larger than its actual size. Subtle undulation
maximizes the sense of anticipation as one walks through the site,
capturing views of the new World Center, ultimately arriving at
the Mary and Howard Frank Plaza, and creates spaces for both
intimate and large gatherings.
Coastal Systems provided site/civil engineering services as part of
the multi-disciplined design team led by the Dutch architectural
firm, West 8. Coastal Systems completed the stormwater
management design for the site, and processed the Class II permit
through the Miami-Dade County Department of Environmental
Resource Management (DERM). In addition, water and sanitary
sewer services were design for the site. The site/civil design was
coordinated with the adjacent right-of-way design for Lincoln
Lane, 17th Street, and Washington A venue.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146 . Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.comeinfo@coastals}.Stemsint.com
)
~,
~~
SYSTEMS
~
-=- Ardarmn & Associates, Inc. ([j) I
=----~ C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ Watenas CorIsUtarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 18
)
ARDAMAN & ASSOCIATES - PROJECT EXPERIENCE
Palmetto Expressway Improvement, S.R.'s 826 and 836, Florida
Department of Transportation, District 6, Dade County, Florida
Geotechnical Investigation for the Section 5 of the Palmetto
Expressway Development. Ardaman's work included SR 826
(Palmetto Expressway) from Flagler Street to N.W. 25th Street and
SR 836 form 87Th Avenue to N.W. 5ih Avenue.
The project included five (5) bridges with eight (8) Flyovers.
Recommendations for driven pile shafts of different diameter were
provided.
Sawgrass Expressway Ramp Toll Plaza Improvements (US441 &
Lyons Road . New toll facilities/roadway improvements), Broward
County
Geotechnical investigation for the improvements and widening of
five (5) ramps connecting the Sawgrass Expressway to US-441 and
Lyons Road. Standard penetration test and auger borings were
performed up to 20 feet below grade. Laboratory testing and
engineering recommendations were provided for the new toll
facilities and roadway improvements.
HADONNE CORP. - PROJECT EXPERIENCE
FDOT District VI, Golden Glades Interchange PD&E Study,
From SR 826 (Palmetto Expressway) EB to SR 9A /1-95 NB
Land Surveying and Mapping Services were provided including
Horizontal and Vertical Control Survey, Alignment and Existing
Right-of-Way Lines, Aerial Targets, Drainage Survey,
Geotechnical Support and Boundary Survey. Surveyors for the
development of this two stage PD&E Study. The Golden Glades
Interchange is of regional importance providing connectivity to six
major principal atterials and/or limited access expressway facilities
including 1-95/SR 9A, SR 9, SR 91 (Florida's Turnpike), US-
4411SR 7 and SR 826 (The Palmetto Expressway). The first stage
is to evaluate a new direct connect ramp from Eastbound SR 826 to
Northbound 1-95 as well as various operational improvements to the
various interchange internal ramp systems (including development
of an IMR). The second Stage is to develop a Master Plan that
incorporates these improvements in addition to the development of
a direct connect elevated managed lanes connection to and from SR
826 to and from the notth connecting to the 1-95 elevated flyover
express lanes.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
'\V\\'W.coastalsvstemsint,com- info@coastalsystemsint.com
~)
~. ~T~AL
~.
SYSTEMS
~
IlIIIW:1I Ardarmn & Associates, Inc. ([j) \
~ C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~. WatenasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 1 9
)
Replace Two Failed Plugs (Dames) at Cape Sable, (East Cape Canal
Extension and Homestead Canal Everglades National Park, Monroe
County, Florida
Professional Land Surveying Services Replace two (2) Failed
Plugs (Dams) at Cape Sable (East Cape and Homestead Dams,
EVER-152464 with the United State Department of the Interior,
National Park Service.
. Establish Horizontal and Vertical Control Points and layout work
limits at the East Cape Canal and Homestead Canal Dam
locations, and confirm the proposed locations of all topographic,
construction, or other items affecting the Work.
. Installed two (2) permanent survey bench marks at the East Cape
Canal and Homestead Canal Dam locations.
. Established line and grade and install offsets of the proposed
steel sheeting structures at the East Cape Canal Dam locations.
. Install temporary markers for the proposed permanent wood
channel marker piling in Lake Ingraham.
. Periodic on-site survey as needed, including but not limited to
layout of the proposed mooring piles, walkway, gangway, and
final grade elevations.
. Provide documentation related to the survey activities as
required by Contract specification.
. Final as-built with dimensions, locations, angle and elevation of
the permanent work.
Caribbean Boulevard from US1 to Anchor Road, Miami-Dade
County, Florida
MDW ASD Survey Procedure for Horizontal and Veltical Control.
. Survey stationing goes from South to NOlth and from West to
East (if a pipeline project). Stationing tied to established
monumental lines. The surveyor tied baseline or centerline to
section corners, or to monument lines or to Right-of-Way lines
at intersection (if a pipeline project).
. Survey performed in the State Plane Coordinate System.
. The surveyor must reference points along the survey line to
perpetuate the alignment. Whenever possible, the reference
points established at right angles to the survey base line and at
intervals no longer than 1,400 feet. Show reference points on
construction plans at intersection (if a pipeline project).
. Established the centerline of side streets. Set nail and disc. Give
station equation and angle turned. Show on plans (if a pipeline
project).
. All curve data (horizontal) showed on plans. Set points of
curvature and points of tangency in the field, reference the P.c.
and P.T. or P.I. (if a pipeline project).
Corpo"'te Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661.3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 1010 \Vest Palm Beach, Florida 33411 . Tel: 561-640-1003. Fax: 561-640-1009
www.coastalsvstemsint.com.info@coastalsystemsint.com
J
_COAST.AL
. -...-.
'-" ..~
SYSTEMS
~
.,.,. Ardarmn & Associates, Inc. ([j) I
=.::.:..a.::.: C'roochicaJ. Envirmrerla ad . HAD 0 N N E
~ Mltooas CorIsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 20
)
. Tied easement lines to the baseline; station and angle given
turned (if a pipeline project).
· Set centerline or base line stations every 100 feet on the ground
using iron rods in dirt area or P.K. nails on asphalt (if a pipeline
project), and show elevation of set points.
. On vertical control referred to the datum used (NGVD29). The
Department will allow the use of an assumed datum only with
permission in writing and under no circumstance will the
elevation assumed be less than 100.00.
. The surveyor established bench marks and temporary bench
marks (T.B.M.) throughout the project at approximately 1,000
feet intervals (if a pipeline project). Show information on plans.
. The surveyor established bench marks and temporary bench
marks (T.B.M.) throughout the project at approximately 1,000
feet intervals (if a pipeline project). Show information on plans.
. Tied the centerline to the baseline, if different, to each other (if a
pipeline project).
. Tied proposed pipe to centerline or baseline not to Right-of-Way
line. The surveyor tied the Right-of-Way line to the centerline or
the baseline (if a pipeline project)
. All survey information showed on plans.
. All points of intersections and deflection angles showed. Bearings
can substitute angles (if a pipeline project). Include bases of
bearings on plans (plat, township, etc.)
. Topographic information gathered will include the following:
. Horizontal and veltical location of visible fixed improvements
within project limits.
. Location of trees with 3-inch diameter trunks or larger.
. Rim, top and invert elevations of all existing sanitary sewers'
manholes, pump wet and dry wells, drainage culverts, manholes
and catch basins.
. Locate project site centerline low and high points with elevations.
. Cross-sections elevations at approximately one hundred (100) feet
stations of the applicable features (if a pipeline project).
. The centerline of the roadway
. Edge of the pavement
. Top and bottom of shoulder
. The centerline of swale
. Gutter
. Top of the curb
. Back of the sidewalk
. Right-of-Way line
. Low points and medians
. Any abrupt changes in grades immediately beyond the limits of
the project.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305.661-3655 . Fax: 305-661.1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.comeinfo@coasulsystemsint.com
~,
a
SYSTEMS
~
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 21
..... Ardarmn & Associates, Inc. ([j) I
--=.a.= C'roochicaJ. EnvirCXlTerla ad H A DO N N E
~ Walenas CorIsUlarts
Schedule of Proposed Services
Coastal Systems goal for effective project management is to clearly define scope and fee budget for a
project from the beginning, in close conjunction with the City of Sunny Isles Beach. Roles and
responsibilities are clearly conveyed and a project schedule established with milestones. Coastal Systems
strives to define the regulatory strategy prior to submitting permit applications through pre-application
meetings and an in-depth knowledge of state and federal permitting regulations. Coastal System
anticipates the schedule as follows:
Schedule of Work
Surveying and SubsUlface Utilities
Preliminary Design
Environmental Permitting
Final Design
Total Engineering and Permitting
Duration
30 Days
30 Days
90 Days
30 Days
180 Days
Bidding and Contract Award
Construction
Total Project Duration
90 Days
120 Days
390 Days
)
Cotporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305.661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561.640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.comeinfo@coastals).Stemsint.com
/-,
ii~
SYSTEMS
~
-=w Ardarran & Associates, Inc.
~ C'roe:::lYicaJ. EnvirCXlTerla ad
~. MltaiasCorlsUlarts
([j) I HADONNE
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 22
3. STAFFING
EDUCATION
Master of Science, Coastal Engineering,
Old Dominion University, Norfolk, Virginia,
1994
Bachelor of Science, Civil Engineering, Old
Dominion University, Norfolk, Virginia, 1992
LICENSURE
Professional Engineer, FL, VA
PROFESSIONAL AFFILIATIONS
FES, Florida Engineering Society
American Society of Civil Engineers
Past-President, Miami-Dade Branch
American Society of Civil Engineers
Ports and Harbors
Committee - Engineer/Diver
Standard Task Committee
American Society of Civil Engineers
Marinas 2020 Committee
)
PUBLICATIONS
"Dune Management on an Urban Coast,"
T.K. Blankenship, C. Brush and J. Rubin
Presented at 2005 FSBPA Conference
"To Repair or Replace a Bulkhead: That is
the Question," Marina Dockage, 2004
"Artificial Reef Construction: An Engineered
Approach," R. H. Sasso, T.K. Blankenship,
S. Higgins, and K. Banks, Feb. 2004
National Conference in Beach Preservation
Technology
"Mooring Buoys for the Largest Cruise Ship
in the World," J. Juhl, R.H. Sasso, T.K.
Blankenship, and B. Johansen,
Proceedings of Ports 2001 Conference
TIMOTHY K. BLANKENSHIP, P.E.
Project Manager
Mr. Blankenship has over 17 years of experience in the civil and
coastal engineering fields. His broad range of experience includes
projects involving waterfront facility assessment and rehabilitation
design, bridge engineering projects involving structural
assessment, structural design and hydraulic analysis/design; land
development projects including drainage design and environmental
permitting, and construction phase services for several civil
projects.
Mr. Blankenship has extensive experience with civil engineering
projects in South Florida and the Caribbean. These projects have
included the design of paving, grading and storm water
management systems for streetscape improvement projects and site
development projects. These projects have included water and
sanitary connection and distribution design along with
coordination with local agencies such as Miami-Dade W ASD. In
addition, he has designed water and sanitary sewer systems for
remote islands utilizing reverse osmosis water treatment sewage
treatment package plants. Mr. Blankenship has managed the
preparation of construction document packages for multi-
disciplined trades including architectural, civil, environmental,
electrical and mechanical engineering trades.
REPRESENTATIVE PROJECT EXPERIENCE
Sunny Isles Coastal Analysis, Florida
Client: City of Sunny Isles Beach
Coastal Systems conducted an assessment of local sediment
transport characteristics and the potential for shoreline
stabilization within the City of Sunny Isles Beach. An evaluation
of nearshore coastal processes and sediment transpOlt
characteristics in the Project vicinity was completed. Based on the
assessment, a long-term beach management plan was prepared for
long-term beach planning.
1826 Collins Avenue Garage, Miami Beach, Florida
CLIENT: Crescent Heights
Site/civil engineering services for 139 space 4-story automated
parking garage. Designed paving, grading and drainage as well as
water and sewer services. Processed stormwater plans through
Miami-Dade DERM and drainage well through Florida DEP.
Processed Driveway Connection and Drainage permits through
FDOT.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003. Fax: 561-640-1009
www.coastalsvstemsint.com.info::.Wcoastalsystemsint.com
'}
~C:AS:.L"
:-I ,...
\ .
SYSTEMS
~
-=w Ardarmn & Associates, Inc. ([j) I
--=:..&.::: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ Mltenas CorIsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 23
Bayfront Street Ends Improvements, Miami Beach, Florida
CLIENT: City of Miami Beach
Bulkhead design and environmental permitting for street ends at
South Shore Drive, loth Street, 14th Street, Lincoln Road as well as
Island View Park. Streetscape design for street ends at South Shore
Drive, loth Street and Lincoln Road.
TIMOTHY K. BLANKENSHIP, P.E.
)
Beachwalk, Miami Beach, Florida
CLIENT: City of Miami Beach
Civil/coastal engineering design and environmental permitting for
the 4,000 foot on grade paver walkway that connects Lummus
Park nOlth to 21 st Street in the South Beach district of Miami
Beach, along with associated amenities and landscaping.
Beachwalk II, Miami Beach, Florida
CLIENT: City of Miami Beach
Civil/coastal engineering design and environmental permitting for
the 2,300 linear feet on-grade paver walkway that connects South
Pointe Park, Mmjory Stoneman Douglas Park, and Lummus Park
in the South Beach district of Miami Beach.
North Beach Recreational Corridor (NBRC), Miami Beach, Florida
CLIENT: City of Miami Beach
Design and environmental permitting of multi-purpose public
access cOITidor to traverse along the western edge of the beach
dunes between 64th Street and 79th Street. Design encompasses 15
blocks and three city parks.
Capri South Beach, Miami Beach, Florida
CLIENT: Maefield Development
Project included design of a 490 linear-foot steel sheet pile
bulkhead and concrete cap to replace an existing bulkhead.
Bulkhead was designed to serve as a portion of the cofferdam for
the excavation and dewatering phases of the upland development.
Indian Creek Greenway, Miami Beach, Florida
CLIENT: City of Miami Beach
Planning and environmental permitting for pedestrian watelfront
recreational corridor extending from 23rd Street to 29th Street along
the Indian Creek Waterway. Conducted hydrographic/marine
surveys and shoreline stabilization studies.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661.1914
Regional Office: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.com.info@coastalsystemsint.com
~)
=t.
~~
SYSTEMS
~
---- Ardarmn & Associates, Inc. ([j) I
~ C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~. M3lenasCorlsUtarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 24
TIMOTHY K. BLANKENSHIP, P.E.
)
Jose Marti Park, Miami Florida
CLIENT: City of Miami
Site/civil engineering for I-acre project site development with a
community gymnasium. Paving, grading and stormwater
management designs were completed, and water/sewer services
were provided to the site. Street improvements were designed for
SW 5th Street.
Little Haiti Cultural Center, Miami, Florida
CLIENT: City of Miami
Site/civil engineering for a 1.5 acre site development with a
cultural center and theater. Paving, grading and stormwater
management designs were completed, and water/sewer services
were provided to the site including a water main extension. Street
improvements were designed along with 3 parking lots totaling
ISO spaces.
Miami Beach SoundScape, Florida
CLIENT: City of Miami Beach
The 2.5-acre Lincoln Park will serve as the grand entrance to the
Gehry-designed New World Symphony. Coastal Systems provided
site/civil engineering services as part of the design team led by the
architectural firm, WestS. The new urban park is located in the
cultural and civic hemt of downtown Miami Beach, and it will
serve as an outdoor pelformance space for the New World
Symphony as well as a distinctive park for residents and visitors.
Pine Tree Park, Miami Beach, Florida
CLIENT: City of Miami Beach
Shoreline, marine resource and hydrographic surveys along park
watelfront. Feasibility and preliminary design of canal and public
water access structures.
Rickenbacker Causeway Recreation Area, Miami-Dade County,
FLORIDA
CLIENT: Miami Dade County Public Works
Design of shoreline stabilization and associated public recreation
area improvements along 2.5 miles of shoreline of the
Rickenbacker Causeway across Biscayne Bay. Marine resource
and hydrographic surveys completed, and coastal engineering
analysis conducted to assess design wave conditions, sediment
transport and optimum shoreline stabilization methods. Design
elements included landscaping, invasive species removal with
native species restoration, parking improvements, stormwater
management and vendor kiosks for waterfront activities.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146 . Tel: 305-661-3655 . Fax: 305.661-1914
RegionalOffice: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411. Tel: 561-640-1003 . Fax: 561-640-1009
.WWW.coastalsvstemsint.com.info@coasta)systemsint.com
.,
a
SYSTEMS
~
____ Ardarmn & Associates, Inc.
==.a.= C'roochicaJ. EnvirCXlTerla ad
--. Mltenas CorIsUlarts
([j) I HADONNE
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 25
TIMOTHY K. BLANKENSHIP, P.E.
)
Saxony Hotel Redevelopment, Miami Beach, Florida
CLIENT: Patrinely Group, LLC
Coastal permitting for oceanfront condominium and hotel
development.
Setai Development, Miami Beach, Florida
CLIENT: Setai ResOlt and Residences
Civil engineering for site development at Setai Resort in South
Beach. Utilities design for potable water, fire protection and
sanitary sewer.
South Pointe Park, Miami Beach, Florida
CLIENT: Hargreaves and Associates
Civil engineering and coastal/environmental permlttmg for the
design of park improvements at the 16-acre oceanfront park.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146 . Tel: 305.661-3655 . Fax: 305.661-1914
Regional Office: 2047 Vista Parkway, Suite 101. \"\'est Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.comeinfo@coastalsystemsint.com
fie
SYSTEMS
~
..... ArdanBn & Associates, Inc. ([j) I
~ C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~. MltenasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 26
)
EDUCATION
Bachelor of Arts, Construction
Management, Florida International
University, Miami, Florida, 1988
ORESTES BETANCOURT
Senior Civil Designer
Associate in Arts, Engineering, Miami Dade
Community College, Miami, Florida, 1983
Mr. BetancoUl1 has over 20 years of experience in site/civil
engineering and has completed projects for a variety of sites
including hotels, condominiums, marinas, res0l1s,
industrial/commercial areas, and parks. He regularly coordinates
with project consultants including architects, engineers and
mechanical/electrical/plumbing (MEP) to ensure consistent
site/civil design with project requirements.
)
Mr. Betancourt provides design and constlUction administration
services associated with site civil and utility projects undel1aken
by Coastal Systems. He has provided civil design, construction
inspections, field surveys and planning layouts for numerous
site/civil and permitting projects throughout South Florida and the
Caribbean. Mr. Betancourt conducts inspections and interacts with
contractors to ensure the project is completed according to design
plans and specifications. Annually he prepares and processes
approximately six to ten site plans for developments in South
Florida. These plans include civil engineering designs for water
distribution, sanitary sewer, paving, grading, il1'igation and
stormwater management facilities. His stormwater management
design experience includes the use of best management practices
as well as injection wells and exfiltration trenches.
REPRESENTATIVE PROJECT EXPERIENCE
10th Street Auditorium, Miami Beach, Florida
CLIENT: City of Miami Beach
Civil design and environmental permitting for the City of Miami
Beach's 10111 Street Auditorium and Beach Patrol Headquarters.
The design included restoration of the two buildings to include
new water and sewer service, as well as connections to the
adjacent public restrooms.
1826 Collins Avenue Garage, Miami Beach, Florida
CLIENT: Crescent Heights
Site/civil engineering services for 139 space 4-story automated
parking garage. Designed paving, grading and drainage as well as
water and sewer services. Processed stormwater plans through
Miami-Dade DERM and drainage well through Florida DEP.
Processed Driveway Connection and Drainage permits through
FDOT.
Corporate Office: 464 South Dixie Highway. Coral Gables. Florida 33146. Tel: 305-661-3655 . Fax: 305.661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640.1003. Fax: 561-640-1009
www.coastalsvstemsint.com.info@coastalsystemsint.com
/~)
ii
SYSTEMS
~
.". Ardarmn & Associates, Inc. ([j) I
~ C'roochicaJ. EnvirCXlTerla ad H A DO N N E
~. WalenasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 27
Bayfront Street Ends Improvements, Miami Beach, Florida
CLIENT: City of Miami Beach
Bulkhead design and environmental permitting for street ends at
South Shore Drive, lOth Street, 14th Street, Lincoln Road as well as
Island View Park. Streetscape design for street ends at South Shore
Drive, lOth Street and Lincoln Road to improve upland access to
the waterfront. Paving, grading, drainage lighting and
landscape/hardscape improvements.
ORESTES BETANCOURT
)
Beachwalk, Miami Beach, Florida
CLIENT: City of Miami Beach
Civil/coastal engineering design and environmental permitting for
the 4,000 foot on grade paver walkway that connects Lummus
Park nOlth to 21 st Street in the South Beach district of Miami
Beach, along with associated amenities and landscaping.
Capri South Beach, Miami Beach, Florida
CLIENT: Maefield Development
Paving, grading and drainage design for 3 residential complexes
with a total 72 units and an underground parking garage next to
Biscayne Bay, covering two city blocks. Design included water
main extensions for each street, fire, sanitary services, street ends
and storm drainage system improvement for the neighborhood
with associated pump stations.
The Clevelander Hotel, Miami Beach, Florida
CLIENT: City of Miami Beach
Civil engineering design and environmental permlttmg for the
renovations including a new drainage system, water and sewer
services, and site grading to accommodate the existing adjacent
public sidewalks.
Courts of South Beach, Miami Beach, Florida
CLIENT: Courts of South Beach
Paving, grading and stormwater management design for 400-Unit,
multi-family development located in the historic South Beach
District of Miami Beach. Designs also included water mains and
sanitary sewer service.
Hadley Park, Miami, Florida
CLIENT: City of Miami
Civil engineering design including ground stabilization for fire
truck access, stormwater drainage, water and sewer for a new park
pavilion/amenity building within the City of Miami's Hadley Park.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655. Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
wv,rw.coastalsystemsint.com. info@coastals)'stemsint.com
')
e...~.TAL ~
~;--
SYSTEMS
~
....... Ardarmn & Associates, Inc. ([j) I
~ C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~. MltenasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 28
ORESTES BETANCOURT
)
Jose Marti Park, Miami Florida
CLIENT: City of Miami
Site/civil engineering for I-acre project site development with a
community gymnasium. Paving, grading and stormwater
management designs were completed and water/sewer services
were provided to the site. Street improvements were designed for
South West 5th Street.
Little Haiti Cultural Center, Miami, Florida
CLIENT: City of Miami
Site/civil engineering for a 1.5 acre site development with a
cultural center and theater. Paving, grading and stormwater
management designs were completed and water/sewer services
were provided to the site including a water main extension. Street
improvements were designed along with three (3) parking lots
totaling 180 spaces.
North Beach Recreational Corridor (NBRC), Miami Beach, Florida
CLIENT: City of Miami Beach
Site/Civil engineering services include paving and grading for
6,700 linear feet of multi-purpose public access corridor to traverse
along the western edge of the beach dunes between 64th Street and
79th Street. Design includes dune enhancements, landscaping,
electrical and water service for irrigation.
Setai Development, Miami Beach, Florida
CLIENT: Setai Res0l1 and Residences
Paving, grading, and drainage designs for a new residential
condominium tower with 195 units as well as hotel renovations.
Design included water, fire and sanitary services as well as a drop-
off lane on Collins A venue and 20th and 21 SI Street end
improvements.
South of Fifth, Miami Beach, Florida
CLIENT: Brio Investment Group
Development of four condominium buildings on top of a garage
pedestal with an on-grade pool deck area and dune restoration
project. Provided coastal permitting and engineering services that
included permits from the Florida Depal1ment of Environmental
Protection (DEP) and marine turtle lighting review through the
Florida Fish and Wildlife Conservation Commission (FWC). Also
provided Florida Building Code, City Code (FBC), and Federal
Emergency Management Agency (FEMA) flood compliance
reviews.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146 . Tel: 305-661-3655 . Fax: 305.661-1914
Regional Office: 2047 Vista Patkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.comeinfo@>coastalsystemsint.com
)
~CO.AS:L ..,.
. ~
~ ..
. \'
SYSTEMS
~
..... Ardarmn & Associates, Inc.
~ C'roochicaJ. EnvirCXlTerla ad
~. Mllerias CorIsUlarts
([j) I HADONNE
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 29
ORESTES BETANCOURT
)
South Pointe Park, Miami Beach, Florida
CLIENT: Hargreaves and Associates
Civil design and coastal/environmental permlttmg of a multi-
purpose recreational park area for structural, hardscape, and
landscape improvements in excess of 16 acres. Activities include
the construction of a main park structure with
offices/concession/restrooms, a storage facility for park vehicles, a
raised serpentine walkway, and playground facilities.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146 . Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coasulsvstemsint.comeinfo@coastalsystemsint.com
ii~
SYSTEMS
~
,.... Ardarmn & Associates, Inc. ([j) I
~ C'roochicaJ. Enviroorerta ad H A DO N N E
~. tv'alenasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 30
/)
EDUCATION
Bachelor of Science in Civil Engineering,
Florida International University, Miami,
Florida, 2001
ANDRES PEREZ, P.E.
Civil Engineer
LICENSURE
Professional Engineer, FL
Mr. Perez has over 10 years of civil engineering experience in
Florida. He has completed the planning, design and construction
administration for site/civil projects including parks, streetscape,
and Right-of-Way. He has also completed designs for private site
developments such as hotels, condominiums, parking lots/garages,
commercial properties and dry stack marinas. These projects have
required the design of storm water management systems consisting
of retention areas, drainage wells, exfiltration trenches, and outfalls.
These projects have also required the design of water and sanitary
sewer serVIces.
)
His site/civil design experience in Florida includes the permitting of
projects through agencies such as the Florida Department of
Environmental Protection (DEP), South Florida Water Management
District, and Florida Department of Transportation. He has
processed storm water management designs through these agencies
to obtain Environmental Resource Permits (ERP), and he has
demonstrated experience with projects adjacent to the coast and/or
waterfront. These projects have required extensive coordination
with diverse project teams to design projects that meet the
development programming goals for both public and private sector
clients, but that also meet the stringent regulatory permitting criteria
to manage surface water runoff.
Mr. Perez completes his civil engineering design projects utilizing
advanced software tools such as Autodesk Civil 3D. This software
facilitates the design of earthworks, dredging, roadway, pedestrian
path, and coastal dune projects. Digital TelTain Models (DTM) are
created for the calculations of emthworks. The design is completed
within the AutoCAD system for efficient production of construction
plans with quantity estimates.
Mr. Perez has completed the planning and design of international
heavy civil works projects in the Caribbean and in Central America.
These projects have included water distribution design on remote
islands with reverse osmosis water treatments package plants, as
well as sanitary sewer collection systems integrated with sewage
treatment package plants. The water distribution and sewage
collection systems have required the estimation of utility loads
based on the development programming and the numerical
modeling of the systems to confirm the design requirements. The
modeling optimizes the pipe sizes and pump/station requirements
based on the site geometry and topography.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003. Fax: 561-640-1009
'w'\vw.coastalsvstemsint.come info@coastalsystemsint.com
r)
=
mr-
SYSTEMS
~
~ Ardarmn & Associates, Inc. ([j) I
~ C'rooclTicaJ. EnvirCXlTerla ad HAD 0 N N E
~ Walenas CorIsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 31
Mr. Perez has completed utilities designs for private island cruise
ship destinations and resOlt developments in excess of 400 acres.
These design projects have required the coordination with other
utilities including electrical, communication, and fuel systems.
ANDRES PEREZ, P.E.
)
REPRESENTATIVE PROJECT EXPERIENCE
1826 Collins Avenue Garage, Miami Beach, Florida
CLIENT: Crescent Heights
Site/civil engineering services for 139 space 4-story automated
parking garage. Designed paving, grading and drainage as well as
water and sewer services. Processed stormwater plans through
Miami-Dade DERM and drainage well through Florida DEP.
Processed Driveway Connection and Drainage permits through
FDOT.
Bayfront Street Ends Improvements, Miami Beach, Florida
CLIENT: City of Miami Beach
Bulkhead design and environmental permitting for street ends at
South Shore Drive, 10th Street, 14th Street, Lincoln Road as well as
Island View Park. Streetscape design for street ends at South Shore
Drive, loth Street and Lincoln Road to improve upland access to the
waterfront. Paving, grading, drainage lighting and
landscape/hardscape improvements.
Beachwalk, Miami Beach, Florida
CLIENT: City of Miami Beach
Civil/coastal engineering design and environmental permitting for
the 4,000 foot on grade paver walkway that connects Lummus Park
north to 21 st Street in the South Beach district of Miami Beach,
along with associated amenities and landscaping.
Beachwalk II, Miami Beach, Florida
CLIENT: City of Miami Beach
Civil/coastal engineering design and environmental permitting for
the 2,300 feet on grade paver walkway that connects South Pointe
Park, Marjory Stoneman Douglas Park, and Lummus Park in the
South Beach district of Miami Beach.
Pine Tree Park, Miami Beach, Florida
CLIENT: City of Miami Beach
Shoreline, marine resource and hydrographic surveys along park
waterfront. Feasibility and preliminary design of canal and public
water access structures.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
RegionalOffice: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
'\vww.coastalsvstemsint.com. infC@coastalsystemsint.com
)
IIIJ'1I Ardarmn & Associates, Inc. ([j) I
~ C'roochicaJ. EnvirCXlTerla ad . HAD 0 N N E
~. MltenasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 32
ANDRES PEREZ, P.E.
)
Capri South Beach, Miami Beach, Florida
CLIENT: Maefield Development
Paving, grading and drainage design for 3 residential complexes
with a total 72 units and an underground parking garage next to
Biscayne Bay, covering two city blocks. Design included water
main extensions for each street, fire, sanitary services, street ends
and storm drainage system improvement for the neighborhood with
associated pump stations.
Cococay Site Infrastructure Improvements, Berry Islands, Bahamas
CLIENT: Royal Caribbean International
Designed site infrastructure to accomodate cruise ship passengers
and staff at private island destination. Utilities designed included
fuel handling, RIO water treatment, diesel electrical generation,
reclaimed water, solid waste incineration and sewage treatment.
Designed heavy earthworks including site grading and drainage.
Provided construction management services.
Great Stirrup Cay Cruise Ship Destination Development, Berry
Islands, Bahamas
CLIENT: Norwegian Cruise Line
Site investigations and master planning for cruise ship private island
destination improvements to accommodate 5,400 passenger cruise
ships. Evaluated coastal processes, potential cruise ship pier
alternative locations, and island infrastructure improvements.
Engineering services fir design-build construction of marine works
including tender basin and dock facilities, RO/RO facility and
beach improvements.
Hadley Park, Miami, Florida
CLIENT: City of Miami
Civil engineering design including ground stabilization for fire
truck access, stormwater drainage, water and sewer for a new park
pavilion/amenity building within the City of Miami's Hadley Park.
Jose Marti Park, Miami Florida
CLIENT: City of Miami
Site/civil engineering for I-acre project site development with a
community gymnasium. Paving, grading and stormwater
management designs were completed and water/sewer services
were provided to the site. Street improvements were designed for
South West 5th Street.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.com.info@coastalsystemsint.com
)
=t
~~
SYSTEMS
~
IIIIIIr"1I Ardaman & Associates, Inc. ([j) I
~ C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~. Mllenas CorIsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 33
Miami Beach Soundscape, Miami Beach, Florida
CLIENT: City of Miami Beach
The 2.5-acre Lincoln Park will serve as the grand entrance to the
Gehry-designed New World Symphony. Coastal Systems is
provided site/civil engineering services as p31t of the design team
led by the architectural firm, WestS. The new urban park is located
in the cultural and civic hemt of downtown Miami Beach, and it
will serve as an outdoor performance space for the New World
Symphony as well as a distinctive park for residents and visitors.
ANDRES PEREZ, P.E.
)
Museum Park, Miami, Florida
CLIENT: City of Miami
Civil engineering design and regulatory permitting for the 22-acre
site. Design included a stormwater management system that
combines drainage wells with exfiltration trenches along with
retention areas and water and sewer services for the Park, which
includes Miami-Dade Water and Sewer master agreements for the
redeveloped Park.
North Beach Recreational Corridor (NBRC), Miami Beach, Florida
CLIENT: City of Miami Beach
Site/Civil engineering services include paving and grading for 6,700
LF of multi-purpose public access corridor to traverse along the
western edge of the beach dunes between 64th Street and 79th Street.
Design includes dune enhancements, landscaping, electrical and
water service for irrigation.
South of Fifth, Miami Beach, Florida
CLIENT: BR Villa Luisa, LLC.
Development of four condominium buildings on top of a garage
pedestal with an on-grade pool deck area and dune restoration
project. Provided coastal permitting and engineering services that
included permits from the Florida Depmtment of Environmental
Protection (DEP) and marine turtle lighting review through the
Florida Fish and Wildlife Conservation Commission (FWC). Also
provided Florida Building Code, City Code (FBC), and Federal
Emergency Management Agency (FEMA) flood compliance
revIews.
South Pointe Park, Miami Beach, Florida
CLIENT: Hargreaves and Associates
Civil design and coastal/environmental permlttmg of a multi-
purpose recreational park area for structural, hardscape, and
landscape improvements in excess of 16 acres. Activities include
the construction of a main park structure with
offices/concession/restrooms, a storage facility for park vehicles, a
raised serpentine walkway, and playground facilities.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661.3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640.1003. Fax: S61-640-1009
w"ww.coastalsvstemsint.com- info@coastals)'stemsint.com
'}
a
SYSTEMS
~
..-:11 Ardarmn & Associates, lroc.
=.a.= C'roochicaJ. EnvirCXlTerla ad
--. Mlterias CorIsUlarts
([j) I HADONNE
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 34
ANDRES PEREZ, P.E.
)
Stormwater Treatment Distribution Area (STDA), Miami-Dade
County, Florida
CLIENT: Miami-Dade County DERM
Civil engineering design for an 88-acre basin pump stormwater
runoff for treatment from the Homestead Military base utilizing
natural wetlands. Design included the pumping station consisting of
twin 18,000 GPM pumps, dikes and outfall structures with
telemetry for remote control of facility and performance
monitoring.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655. Fax: 305-661.1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.com.info@coastalsystemsint.com
~L..
~
SYSTEMS
~
-=- Ardarmn & Associates, Inc. ([j) I
=.::.:..a.::.: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ MltenasCorlsUtarts
December 2,2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 35
I~')
EDUCATION
Ph.D. Technical Sciences in Soil
Mechanics, University of Havana, Cuba
EVELlO HORTA, PH.D, P.E. - ARDAMAN & ASSOCIATES, INC.
Senior Project Engineer
B.S.C.E. University of Havana, Cuba
Mr. Horta supervises geotechnical investigations and prepares
recommendations for a wide variety of projects including low to
high rise structures, highways and bridges, embankments, dams,
and public work projects. He also supervises construction
monitoring and testing on similar projects. He also manages and
supervises engineering services on environmental projects including
Phase I and Phase II assessments, contamination assessments, and
remediation. Mr. H0l1a has over 25 years of varied experience in
the field of geotechnical engineering. His project list ranges from
relatively small buildings to major public works projects such as
dams and large hydraulic facilities.
M.S. in Soil Mechanics, University of
Havana, Cuba
LICENSURE
Professional Engineer, FL
No. 46625
REPRESENTATIVE PROJECT EXPERIENCE
)
Palmetto Expressway Improvement, S.R.'s 826 and 836, Florida
Department of Transportation, District 6, Dade County, Florida
Mr. Horta served as Senior Project Engineer for this project that
includes 55 bridges, large retaining walls, 30 feet high
embankments and variable soil conditions. He supervised a field
investigation which included over 215 borings extended to depths
as great as 150 feet. He also conducted detailed foundation analyses
for foundations and embankments, including evaluating various
foundation types such as driven piles, drilled shafts and shallow
footings.
West Dade County Force Main (MDCPW), Florida
Mr. Horta served as geotechnical Senior Project Engineer for the 11
miles for the 54 inch force main for the development of a new
sewer system for this part of the county. Soils borings to 50 feet
below grade were performed at six (6) canal crossings and soil
boring from 20 to 25 feet were completed along the alignment to
provide information for pipe and manhole structures constlUction.
Homestead Extension Florida Turnpike (HEFT), Okeechobee Toll
Plaza to 1.75 Widening, Florida
Mr. Horta served as geotechnical Senior Project Engineer for
investigation of the five bridges included in this HEFT section and
other geotechnical aspects of the project that includes the use of
driving piles, shafts and shallow footings. A total of 25 soil borings
to depths of 70 feet were completed as part of this investigation.
Corpocate Office: 464 South Dixie Highway. Cocal Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvsternsiot.com.info@coastalsystemsint.com
/)
~
~~
SYSTEMS
~
....... Ardarmn & Associates, Inc. ([j) I
~ C'roochicaJ. EnvirCXlTerla ad . HAD 0 N N E
~. MltenasCorlsUtarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQNo.:11-11-02
Page 36
EVELlO HORTA, P.H.D, P.E.
)
South Florida Rail Corridor Phase II, Hialeah Terminal to Hollywood
Boulevard
Mr. HOIta served as geotechnical Senior Project Engineer for the
new railway tracks and two new bridges along the 11 miles project
alignment. Field and laboratory testing were performed that
included deep standard penetration soil borings, pavement survey
and asphalt testing.
Homestead Extension Florida Turnpike (HEFT), Tamiami Toll Plaza
Improvements, Florida
Mr. HOIta served as geotechnical Senior Project Engineer for this
project that extends from SW 56th Street to SW 24th Street. Road
widening, bridge investigation, asphalt pavement survey and testing
and noise wall investigation was included in the geotechnical
investigation. Borings were completed up to 75 feet below grade.
Central Boulevard Expansion, Miami International Airport (MIA),
Florida
Mr. Horta served as geotechnical Senior Project Engineer for the
expansion and improvement of the entrance road of MIA that
includes widening of the existing Central Boulevard, NW 20th
Street west of Lejeune Road, six (6) new bridges and widening of
eight (8) bridges. Field and laboratory testing were performed that
included eight standard penetration soil borings to 75 feet below
grade, drainage and asphalt testing. He also conducted detailed
analysis for foundations and embankments, including various
foundation types such as driven piles, drilled shafts and shallow
footings.
SR 836.RSRR Westbound to Southbound HRFT Connection, Miami,
Florida
Mr. Horta performed analyses of the central pier foundation
settlements. Provided recommendations for underpinning of
the foundation based on the results of modeling of the structures
using the Plaxis 3D program.
MIC.MIA Elevated Railroad, Miami International Airport 2002
DAC, Florida
Mr. Horta served as Senior Project Engineer for the new elevated
railroad connecting the MIA terminals with the new complex of car
rental east of Lejeune Road. The geotechnical investigation
included deep borings, laboratory testing and studies to provide
recommendations for piles and shaft foundation for the new
continuous bridge structure and its maintenance facilities.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite tOto West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.comeinfo@.lcoastalsystemsint.com
/ )
ECOAS~L
'-' ,.:---
,
SYSTEMS
~
..... Ardarmn & Associates, Inc. ([j) I
==.a..= C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
____ Mltenas CorIsUtarts
December 2,2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 37
EVELlO HORTA, P.H.D, P.E.
)
SR 826 Improvement Program; SR 826/836 Interchange - FOOT,
District 6, Miami, Florida
Mr. HOlta served as Senior Geotechnical Engineer for this
interchange which includes 50 bridges on variable soil conditions.
The bridges will be separated on shafts and driven piles. The soil
investigation includes about 230 borings extended to depths of 125
feet below grade.
Sawgrass Expressway Ramp Toll Plaza Improvements (U5441 &
Lyons Rd . New toll facilities/roadway improvements), Broward
County
Mr. Horta as Senior Geotechnical Engineer for this project which
included the geotechnical investigation for the improvements and
widening of five ramps connecting the Sawgrass Expressway to
US-441 and Lyons Road. Standard penetration test and auger
borings were performed up to 20 feet below grade. Laboratory
testing and engineering recommendations were provided for the
new toll facilities and roadway improvements.
Port Boulevard Expansion, Port of Miami, Miami
Mr. Horta served as Senior Geotechnical Project Engineer for
realignment and widening of the POIt of Miami access. Soil
borings for roadway and a new bridge foundation were completed.
NW 57 Avenue (West 4 Avenue) from West 21 Street to West 49
Street, Hialeah, Florida
Mr. Horta served as Senior Geotechnical Project Engineer for this
subsurface exploration and geotechnical engineering evaluation of
the existing 1.9-mile section of W. 4 A venue that will be widened
to the west. Two new bridges will be required to provide access to
lateral streets, retaining walls will be required along the existing
canal to provide room for the proposed widening and the existing
roadway pavement section was evaluated; Drainage and LBR tests
were performed along the alignment. Subsurface exploration was
performed using SPT and Auger borings in accordance with FDOT
recommendations. Engineering work included evaluating alternate
foundations types.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655. Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561.640-1003 . Fax: 561-640-1009
ww'W.coastalsvstemsint.com. infOl@coastalsystemsint.com
")
=
~~
SYSTEMS
~
..:11 Ardarmn & Associates, Inc. ([j) I
~ C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~. MllenasCorlsUlarts
December 2,2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 38
EDUCATION
Civil Engineering Classes at the University
of Santiago of Cuba, Cuba
Surveying I and II Courses at Miami-Dade
Community College, CAiCE Training,
EFB/CEFB and EFBP Training, HECTOR
Training, ESRI Training, Various Surveying
Seminars.
LICENSURE
Professional Surveyor, FL
No. LS6006
)
ABRAHAM HADAD, PSM - HADONNE CORPORATION
Project Surveyor
Mr. Hadad is a Professional Surveyor and Mapper and the
President of Hadonne Corp., an established land surveying and
mapping Firm located in South Florida since 2001. Mr. Hadad is
responsible for the leadership and management of the survey
activities in the firm and has over 20 years of experience and
extensive knowledge of the theories, principles and practices in
the land surveying field. He has the ability to apply advanced
technologies in the preparation of land surveying documents and
legal instruments and documents required to obtain or convey
interests in land for public purposes. During his career he has
served in different capacities in a variety of survey projects for
the Florida Department of Transportation, Miami-Dade County,
Miami-Dade Expressway Authority, City of Miami, and the
private sector.
Mr. Hadad has performed and managed all types of surveying
services including: Design Surveys, Right-of-Way Control
Surveys, Right-of-Way Mapping, Platting, Construction Layout,
As-built Surveys and Drainage Surveys. He has shown a great
capacity to direct and coordinate the work of field and office
employees in a highly conducive manner for the purpose of
performance and high morale. Mr. Hadad is responsible for the
coordination of the major aspects of each project from its
approval to its completion and by applying design criteria and
Land Surveying technical Standards.
REPRESENTATIVE PROJECT EXPERIENCE
City of Miami Gardens, NW 42 Ave. Bridge Replacement, Miami-
Dade County, Florida
Provided Horizontal and Vertical Control Survey, Topographic
Survey of the entire ROW along the project corridor, performed a
Detail Bridge Survey location of all Pile Caps and
measurements, took canal soundings.
Town of Medley, NW South River Drive Corridor, Florida
Survey and Mapping Services. Prepared a base map of NW South
River Drive with Boundaries of the Town of Medley. Requested
from SFWMD the CanalS Base Line Control Survey to digitize
the base line and Canal Right of Ways.
Miami-Dade Public Works Department, S.W. 27th Avenue from US1
to Bay Shore Drive
Boundary, Topographic, & Specific Purpose Survey for Miami
Dade County Public Works Right of Way Division. Provided
location of all visible fixed improvements within project limits,
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coaswsvstemsint.com_info@coastalsystemsint.com
-)
=t~.
-rmr:;
SYSTEMS
~
~ Ardarmn & Associates, Inc. ([j) I
---=-~ C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ Mlte1as CorIsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 39
including roadway pavement, driveways (type of driveways),
sidewalks, walkways, mailboxes, fences, trees (including trunk
diameter), etc. Provided locations of all visible above ground
utilities. Invert elevations for existing storm water and sanitary
manholes, and/or existing inlets and catch basins. Right-of-Way
lines from Plats for S. W. 27th A venue and all cross streets.
ABRAHAM HADAD, PSM
)
N.E. 87th Street from N.W. 2nd Avenue to Farm Road and along N
Miami Avenue, City of EI Portal, Florida
Horizontal and Vertical Control Survey, Topographic Survey,
Digital Terrain Model (DTM), served as Project Surveyor. Prime-
Consultant: New Millennium Design.
Town of Medley, N.W. 97th Ave., Tracts 46 and 46 to Intersection
with N.W. 109th Street, located in Sec. 33-52-40
Map of Topographic survey, research the R/W information within
Miami-Dade County R/W Division and the Town of Medley, to
establish the R/W lines through Project area. Town of Medley,
Florida.
City of Doral, Doral Park Country Club, 4824 N.W. 104 Avenue,
Florida
Prepared Map of Boundary and Topographic Survey of
approximately 12.16 acres. Topographic/elevations of all
aboveground features. Horizontal and Vertical Control Survey.
Right of Way lines and Lot lines verified, served as Project
Surveyor.
Miami-Dade County Transit ROW & Util. Division, MIC Earlington
Heights Connector Project, Florida
Provided Map of Boundary and Topographic Survey for the
acquisition of 5 parcels of land for the MIC Earlington Heights
project for MD County Transit ROW & Utility Division Overtown
Transit Village.
Town of Medley, NW 138th St. starting 200 ft South of Okeechobee
Rd. and extending to the railroad, and 300 ft. of ROW along NW
113th Ave. Rd. going for 300 feet, Medley, Florida
Prepared Map of Topographic and Right of Way Survey.
Elevation every 25' for the entire length of ROW, location and rim
elevation of all manholes/catch basins, of all visible utilities.
Town of Medley Flood Mitigation Project, Florida
Right of Way Mapping and Topographic Survey of over 36,000
L.F. of Section 4-53-40, lying Southwesterly of the F.E.C. Rail
Road.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
\\'v....w.coastalsvstemsiot.com. info@>coastalsystemsint.com
-)
~.
~
SYSTEMS
~
.,... Ardarmn & Associates, Inc. ([j) I
~ C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~. Mlt91as CorIsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 40
Miami-Dade County, Land Surveying Services for Wharf I, located at
the Port of Miami, Florida
Provided Topographic Survey and prepared a Map of Topographic
Survey of existing ground under existing Wharf 1. Wharf I is
about 850' long by 85' wide. The topographic survey was to
develop a TIN file of the ground surface under the wharf and
extend water-ward about 30' beyond the face of the wharf. The
survey also included the location of 15-20 geotechnical borings on
the top side of the wharf and the approximate location of 5 sections
of existing rip-rap located within the project area. The topographic
survey entailed tasks establish Horizontal Control relative to
NAD83/2007 and Vertical Control relative to NA VD88. Control
stations to be established at +/- 1000' intervals and placed in
locations not subject to construction and able to be verified/
utilized during construction. Created a grid based on the location
of all existing piles suppOlting the wharf as necessary to delineate
existing ground conditions. The same methodologies were used to
determine horizontal location and elevations for geotechnical
borings and limits of rip-rap.
ABRAHAM HADAD, PSM
)
Miami Dade Seaport of Miami, Cruise Terminal D & Terminal E
Improvements, Florida
Miscellaneous Construction Survey Services. Performed all
construction layout services for the entire project, requested for
modification and improvement to optimize the use of existing
Cruise Terminals D and E.
United States Dept. of the Interior, National Park Services,
Everglades National Park, Florida
Replace two (2) Failed Plugs (Dames at Cape Sable (East of Cape
and Homestead Dams, EVER-152464 with the United State
Depattment of the Interior, National Park Service. Establish
Horizontal and Vertical Control Points and layout work limits at
the East Cape Canal and Homestead Canal Dam locations, and
confirm the proposed locations at all topographic, construction, or
other items affecting the work. Established line and grade and
installed offsets of the proposed steel sheeting structures at the
East Cape Canal Dam locations. Installed temporary markers, for
the wood channel marker piling, in Lake Ingraham. Periodic on-
site survey as needed, including but not limited to layout of the
proposed mooring piles, walkway, gangway, and final grade
elevations.
Corpo'"te Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305.661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003. Fax: 561-640-1009
www.coastalsvsremsint.comeinfo@coastalsystemsint.com
")
Ere
SYSTEMS
~
~ Ardarmn & Associates, Inc.
:==.a.= C'roochicaJ. EnvirCXlTerla ad
~ MoltaiasOlnsUlarts
([j) I HADONNE
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 41
PROFESSIONAL LICENSE
Coastal Systems' professional license is enclosed on the following page.
)
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fa" 305-661-1914
RegionalOffice: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561.640-1003 . Fax: 561-640-1009
.WWW.coastalsvstemslnt.com.info@coastals}.stemsint.com
)
~COAS:L '::-
. \ '.
, \
SYSTEMS
~
...... Ardarran & Associates, Inc. ([j) I
~ C'roochicaJ. EnvirCXlTerla ad H A DO N N E
~. Mltenas CorIsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 42
)
,/""
."./
State of Florida
Department of State
I certify from the records of this office that COASTAL SYSTEMS
INTERNATIONAL, INC. is a corporation organized under the laws of
the State of Florida, filed on October 14, 1994.
The document number of this corporation is P94000075733.
I further certify that said corporation has paid all fees due this oflice
through December 31, 2011, that its most recent annual report was filed
on January 6, 2011, and its status is active.
I further certify that said corporation has not filed Articles of
Dissolution.
GiI'clI IIl1der 1/1.1' hallt! alld the Grcat Sca/ o(
Florida, at Tallahassee, thc Capital, this the
Set'ellth day of.la/1/1l/1)', 20/1
-~~
SecretalJ' of State
AlIlhl'II!,,-alll'" Ill' 2110191122H~q-{1I11711-1'9-10111111757j'\
I II .llllhl'IlIIL'<l\C Ihl~ ~'l-rtltil'~lk.\ bjllh~ tolhlwitll; ~Ik' l..'illi.'J ILl:'-
II), and {hi.'n hd]o\\ th~ iw,lruL'upn... Jlsp!ay;::d
htt p~ : Ill' tilt'. SII n biz.orgtrl'rta lit h V('L h (1111
Corpowe Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305.661-1914
RegionalOffice: 2047 Vista Patkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561.640-1003. Fax: 561-640-1009
WVIW.coastalsystemsint.come info@?coastals)'Stemsint.com
-=- Ardarmn & Associates, Inc. ([j) I
~ C'roochicaJ. EnvirCXlTerla ad H A DO N N E
~. Walenas CorIsUlarts
December 2,2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 43
')
~:f 1;( ~~
~~...~,
;~<
(!I.~:!
~f
,.~. ~r.j.tt
~h
.. if...
"j,.'
EXPIRATION: 2/28/2013
AUOIT No: 228201302455
CA. Llc. No:
7087
\7.
)
\~\~ ll:"?'fln:t?~
'? ~illlrlr il~ii "'<,,;:~.ol. ~ ugiueetS q
41'< , .t 1
Timothy King~!fi " 'f~enship, P.E.
.-~tJ.. . -
41\!'~~J.;r ~'L_ .'> ~<...~,\ .
.;~f)O \\ \~ 1 \-.'
Is LICENSED AS A PROFESSIONAL ENGINEER UNDER CHAPTER 471. FLORIDA STATUTES
EXPIRATION: 212812013 P.E. LlC. No:
AUDIT No: 228201323892 55910
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beacb, Florida 33411 . Tel: 561.640-1003. Fax: 561-640-1009
www.coastalsvstemsint.com.info@coastals).stemsint.com
)
=t
Sf
SYSTEMS
~
IIl!IIJ1I Ardarmn & Associates, Inc. ([j) I
=.::.:..a.::.: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ Walenas CorIsUtarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQNo.:11-11-02
Page 44
\
,
State of Florida
Department of State
I certify from the records of this office that ARDAMAN &
ASSOCIATES, INC. is a corporation organized under the laws of the
State of Florida, filed on January 2, 1990, effective December 28, 1989.
The document number of this corporation is L40551.
I further certify that said corporation has paid all fees due this office
through December 31, 2011, that its most recent annual report was filed
on January 12,2011, and its status is active.
I further certify that said corporation has not filed Articles of
Dissolution.
Given under my hand and the Great Seal of
Florida, at Tallahassee, the Capital, this the
Thirteenth day of January, 2011
~'.rs
Secretary of State
Authentication 10: 800191120958-011311-IA0551
To authenticate this certificate,visit the following sile, enter this
!D, and then follow the inslnlctions displayed.
https://efile.sunbiz.orglcertauthver.html
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661.1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.comeinfo@coastalsystemsint.com
)
~.S;L
~.
SYSTEMS
~
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 45
..-:lI Ardarmn & Associates, Inc. ([j) I
=.a= C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ WateriasCorlsUlarts
)
}
'. ,~_." c~~':,::,'.'.".~~.;l;:;~t,;-~":~l,,(:'~:;~~-~~,t~~'1?~.i~"~~;:;:;iL::'f','~;:':""',;
.' .' .!-:;O};~}":~'>'~!~~~'~~:i;~;~",~,,\i,:.;~Y:' .,<",< _,::;~'~';;''':';'~''~ .
" .' '-,..' ~0'\..~..v-".: .,'<. ...,J_...."....... ..' ,'"',,',,~~-~;:~, -' ,
,.;::~~ :l'~::';1:'- '1V:~"'~1;:~:~~i'-I:;{':"!;~'~:{~iJ}f';B~;-~~:~;;".~~ ,,'
,- ~~.~ :~'~O~',. ~'- '..v;';"J .lC'.,.~}..'~.pA.l"~~1I13 f tfmmm~ ~ _-~ ~ " .
tr "- .;.,:"i~'~t :~"H"'-' ~-/l.:t.:.: ':1':/...._.~'l,':n.' " ~-... ,,~~..~~..:, . !!4''t. ~" .,l~,::",,' "~".
{:::t~}t;,~~~~;~t~:~e;' . · f)i,:'~'~;';>;:' ,
,.-, . ,.." ',- - .. .-. ".. -..' ',,"'f~~--..." '>'IR.E.", '-"-."
'X~~~}B~)i~;':;fI~iV~", ...f";" '~E;, ,: ~',' ',', . "
, ,,'-EXPIRAnoN' ~i8r'-- ..~f~~:E,N~'N~~,~~b~-CHAPTER 47f ~FLORJDA'sTA-ruTEs
'~~ri1,~~f~~'~~f~6~~"'-';-''< 'O' .,-'" ".,., - ..../.. ..'- P:'~~~Np:,
~
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305.661-3655 . Fax: 305.661-1914
Regional Office: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.com.info@coastalsystemsint.com
.COA~,T,AL
~
, \ '
SYSTEMS
~
IIIIr:"W Ardarren & Associates, Inc.
~ C'roochical. EnvirCXlTerla ad
~. MlleliasCorlsUlaris
([j) I HADONNE
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 46
.)
',;;,
. ~ .~
.';. -'J' ". '." .,.' ;"~..~_:::.' ",'_, _ .,;. ,'I" p" ,_ ..,.< 'f> __ ,:0" '.~/'. ~c_'. ..~,~~I:> -;.':}.\.; ,':;r-.'.'.t
....Icirlda l)epartmentilrA~r1cullurellndConsWDer'Sl:nlcl:~ '- "'-' ',.".'
,..,; 1)I;;lslonorl;onsumti:Sf!n1r.e~, \: ',>;;'TLiccnsc, N():: !--8.4;996 " '.
~,,2(KiS,~Ul~~tJ~~f~~t~~~;~~€~ft~~~[~~~o:. ,. '~'E~pI~ation D~{~; 'Febru~' 28.2013
Professional SuiveyorandMapper License:
umlGi ilr\: pruvisiims of dlup\cr 4 n, F1di.i(j'Q Statutes;'.,
';_ . '\' ;, ...., . '."':,.~ .["".~' ':. ,,':':r:_'-'~ ..:.,-;"::-.~
ARRAHA~tHADAD" ,'" ",. "
I1ADONNECORPI9S'S N'" 88TH'COlJllTSUTTR202'
DORAL\'Fl; 33172 ,.
w~~
AJ)~M H;l'uTNX~l,
toiviMlSSl<?NER.or AGR!CL'LTL1J{E
'.~' ,_,.'. _ ",,:. " ':. i,' _..' '_ ,__ . 'I _ _.', " ,. _, ._ ,.' ...: . :.... ,t.:".._ ,. "'(0.' .." ".' '._,' " ':.t'. - '.'">.,., '.'~
Iht\ i~ 10 ~.,.~fy (hit tl~ profeu!fnal a~'C)tt ~ rmpPa wh[lM:. I1i1m:1Jld IId~&;t ~..~hO\lr1l4.bo~~)~ Uecl1.;~.~,~J r.:q~i:~.~.bDp~r7.'.~:_ f1~~u Statu.c~:
)
Florido DcpnrlUlCut or Agricullure QIId Consumer Sm;ccs
"'D1\'isiun of Ci;risI1lDlJI"Ser\lc~Y ,.,:.
lIoard or I'rnr~sl~nal Sl1r';~);tI~ 'a.nd lI-iaJlper~ .
:2:00S ApnlncheePJ..'WnyTollnbnssee, Florida 3,2399.6500
License No;: LB7097
Expiration p~te) Febr.uary, 28,}013
Profes~iollal SurveY(]r.an~,Mapp~i'JlJ:1sln.ess, License
Under the provisioiis of ciuiplcr472;F1oridit'SI3IuteS'
HAl>ONN~, CORP
l!18S'NW 81iTH"cr STE 202
DORAL, FL 33172.2638
c&7~'~
ADAM H. PUTNAM , ','
CUMMiSSiUNER UF AUIUCtJLTL'RE
1l1i~ i~ 1Q (\;..nil~ chul. tht: pn.,r~'JifJuul tilJt'rt:)"Or nl":l m..pre:r ..".tll.\~ Jllut~ 1lJ\d Ull:..lto~ U~:Ihll\\n nhl,..~h.lwt':~~llIlj n"lllllltl"fll'y (:I~I~ .OZ, "ltJrntu Slallll~
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33t46. Tel: 305-661.3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561.640-1003 . Fax: 56\.640-1009
www.coastalsvstemsint.com.info@coastalsystemsint.com
( )
~t
~
SYSTEMS
~
--=- Ardarmn & Associates, Inc. @ I
=.::.:..a.::.: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ Mltenas CorIsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 47
4. ApPROACH AND METHODOLOGY
Coastal Systems' professional license is enclosed on the following page.
)
Coastal Systems is accustomed
to providing technical depth
and manpower to address
these issues on a timely basis
to keep the permitting process
moving forward as
environmental permitting is
most always on the critical
path of the project schedule.
The Coastal Systems team will utilize project management and
delivery methods for the City of Sunny Isles Beach that has
been successful with other local municipalities over the years.
These strategies have included the following:
. Define appropriate scope of services and project
implementation plan with schedule.
. Conduct Project Kick-off meeting to ensure the City's
requirements are identified in the early stages of the project.
. Begin the environmental permit application process as quickly
as possible to begin the time clock on permitting.
. Conduct topographic, boundary and underground utility survey
to prepare detailed base map for engineering design.
. The South Florida Water Management District (SFWMD) is
the state agency with jurisdiction over most stormwater
management projects. PERA may have delegated authority.
. Maintain open communication with regular updates to the
City on the permit processing.
. Involve the City in all agency negotiations throughout the
permit process to ensure that City staff hears the agency
concerns first-hand.
. Prepare comprehensive responses to agency Requests for
Additional Information (RAI).
. Begin Design Development and Construction Documents as
the permitting are being confirmed through the process.
. Drainage System Design - Once the site conditions are
understood, then the proposed improvements need be overlaid
onto the existing conditions so the grading and drainage can be
designed. Modern civil engineering tools such as Civil3D can
be utilized to provide cut/fill, roadway alignment and cross
sections for earthworks calculations. The drainage design
needs to be completed in accordance with engineering industry
practice and environmental regulatory requirements. Standard
runoff curves and rainfall intensity curves are utilized to
estimate runoff under the existing conditions scenario along
with the proposed site plan. The South Florida area is typically
flat and at lower elevations, therefore the design of the
conveyance system has to be completed carefully with
appropriate piping and structures to ensure proper drainage
flow. Normally a combination of drainage systems are utilized
that may include drainage wells, outfalls, retention ponds,
exfiltration trenches, or swales. The design can fmther
optimized to reduce construction costs.
Corporate Offic", 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661.3655. Fax: 305-661-1914
Regiooal Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel, 561-640-1003. Fax: 561-640.1009
'l;'.rww.coastalsvstemsint,come info<iYcoastalsystemsint.com
.CO::.AL
-'-~
~ \.\~.
SYSTEMS
~
.,... Ardaman & Associates, Inc. ([j) I
==.a.:::: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ Mltenas ConstJtarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 48
)
. Ideally the project can be advertised for bids just as
environmental permits are issued.
. Attend City Commission Meetings if necessary to assist City
staff with updates on project schedule and implementation.
. Assist the City in compiling construction documents to
account for the special requirements of construction in South
Florida.
. Assist the City in the bidding process and reviewing bids to
select a qualified, selected contractor.
. Assist the City in providing constlUction administration to
ensure the project is completed in accordance with the plans
and specifications.
)
The Coastal Systems team has
a proven track record in
completing high quality
infrastructure improvement
projects that include paving,
grading, drainage, water and
sewer, landscape and related
elements.
Suitability of Methodologies and Approaches
Coastal Systems maintains Quality Assurance and Quality Control
(QA/Qc) throughout the Project beginning with the definition of
the scope of services in the contracting process through the final
deliverables required for the Project. A Team Leader is assigned
to each technical team that is responsible for preparing and
finalizing the deliverables in accordance with the scope of
services and recognized industry practice. Furthermore, the
Engineering Team Leader is responsible for ensuring that final
deliverables receive an independent review by the assigned
Engineering or Environmental/Permitting Principal.
Quality Control and Quality Assurance are implemented at all
levels of project delivery at Coastal Systems. senior staff reviews
all Project-relevant correspondence, documents, and deliverables.
Coastal Systems has several Florida-registered professional
engineers on staff that serve as Engineer-of-Record on Projects,
and are responsible for signing/sealing all project constlUction
documents. These professional engineers have over 20 years of
experience in the industry, and participate actively in the project
planning and design process. Additional key QA/QC approaches:
~ Review of construction plans and specifications by an
independent engineer, not actively involved the project as a
"fresh set of eyes."
~ Engineering plans and related-documents are submitted to
senior engineers for review with a "Check Print" stamp. The
stamp is initialed and dated by the reviewer, corrections made
by project staff and initialed/dated, and then back-checked
and initialed/dated to ensure that the revisions were
completed.
Corporate Office: 464 South Dixie Highway. Cor.l G.bles, Florida 33146. Tel: 305.661.3655 . Fax: 305-661-1914
Regio",IOffice: 2047 Vista P.rkway, Suite 1010 West p.lm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561.640-1009
www.coastalsystemsint.comeinfo@coastalsystemsint.com
)
~
mr.
SYSTEMS
~
.... Ardarmn & Associates, Inc. ([j) I
~ C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~ Mltenas CorIsUtarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 49
)
Coastal Systems maintains
Quality Assurance and Quality
Control (QA/Qc) throughout
the Project beginning with
the definition of the scope of
services in the contracting
process through the final
deliverables required for the
Project.
~ For complex projects, a "Design Brief' is prepared to
document design assumptions, relevant codes and practices,
and engineering assumptions. This brief is maintained in a
design notebook that is updated and modified as the project
progresses.
Overall Organization
The Coastal Systems team has a proven track record in
completing high quality infrastructure improvement projects that
include paving, grading, drainage, water and sewer, landscape and
related elements. The Coastal Systems team uses a variety of tools
to ensure a positive experience for the various user groups as well
as minimization of client costs and maintenance issues. Our
dedication to open lines of communication and proven project
management strategies reduces the amount of client oversight
required and streamlines all phases of project implementation
including production of plans, securing permits, and facilitating
the bid and construction phase of the process.
Timelines and Deadlines
Coastal Systems has adequate staff resources and knowledge to
complete all tasks identified in the RFP. Coastal Systems will
complete specific project planning, engineering analyses, design,
cost and alternative analyses, permitting and construction
administration tasks on time schedules mutually agreed between
the City and our office. Coastal Systems goal for effective project
management is to clearly define scope and fee budget for a project
from the beginning, in close conjunction with the City. Roles and
responsibilities are clearly conveyed and a project schedule
established with milestones. Most waterfront projects are complex
in terms of environmental regulatory permitting. Coastal Systems
strives to define the regulatory strategy prior to submitting permit
applications through pre-application meetings and an in-depth
knowledge of state and federal permitting regulations. Additional
studies and meetings are common during the permitting process to
address request for information (RAI) from various government
agencies. Coastal Systems is accustomed to providing technical
depth and manpower to address these issues on a timely basis to
keep the permitting process moving forward as environmental
permitting is most always on the critical path of the project
schedule. Communication with the City is essential during these
periods of time to present strategies and to address the project
scope relative to these RAI's.
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655. Fax: 305.661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003. Fax: 561.640-1009
www.coastalsvstemsint.com_info@coastalsystemsint.com
~)
m
~
~~~I~H:~:JIo~
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 50
..-:11 Ardarmn & Associates, Inc. @ I
__~ C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E
~. Mlterias CorIsUlarts
Coastal Systems also maintains
regular communication with
the regulatory agencies
requiring the additional studies
to ensure the services are
necessary and to
refine/optimize the scope for
efficiency and to reduce costs.
Consulting fees are negotiated at the beginning of the project for
the services anticipated, but additional services may need to be
negotiated to address RAI's or changes in scope. Coastal Systems
strives to utilize available data from other agencies, including the
City, to minimize costs. Coastal Systems also maintains regular
communication with the regulatory agencies requiring the
additional studies to ensure the services are necessary and to
refine/optimize the scope for efficiency and to reduce costs.
)
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561.640-1009
www.coastalsvstemsint.com. infc:<iYcoastalsystemsint.com
")
.C~ASTAL
2
- \ '\ ~
SYSTEMS
~
~ ArdaImn & Associates, Inc. ([j) I
______.a= GooIochicaJ. EnvirCXlTerla !Cd HAD 0 N N E
~ M31enasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 51
5. REFERENCES
Coastal Systems is proud of the quality of work, which we produce and we believe our high percentage of
repeat clients testifies to the success of our staff. Coastal Systems would value the oppOltunity to
demonstrate our capabilities to the City of Sunny Isles. New clients are encouraged to contact our
references. Please refer to the Client Reference Letters on the following page.
)
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www..coastalsvstemsint.comeinfo@coastalsystemsint.com
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 52
Johnny Martinez, P.E,
City Manager
}
~it!' of miami
November 16, 2011
Re: Coastal Systems International, Inc.
Coastal Systems International has been under contract with the City of Miami for Miscellaneous Coastal
Marine engineering projects since 2004. As palt of this task-based contract, Coastal Systems has
completed a variety of engineering design, environmental permitting and construction administration
services for the City. Among those projects was the Museum Park Large Vessel Mooring Facility project
which consisted of the installation of 16 large vessel mooring dolphins adjacent to Museum Park and
within the sensitive marine environment of Biscayne Bay.
Coastal Systems provided engineering design, environmental permitting services with Federal, State and
Local agencies, assisted with the City's bidding process, and provided construction administration
services during the construction phase of the pl'Oject. The total cost of the project was approximately
$1,500,000. The project design, permitting and construction were completed on time and within budget.
)
The professional services provided by Coastal Systems were above expectations and conducted in a very
professional manner responsive to the client needs. If you have any questions, please feel free to contact
me at (305) 416-1094.
CAPITAL IMPROVEMENTS PROGRAM
444 SW 2nd Avenue, 8th Floor I MiamI, FL 33130 I (305) 416-1280 I Fax: (305) 416-2163
Mailing Address: P.O. Box 330708 Miami. FL 33233-0708
-)
Town of Medley
7777 Northwest 72nd Avenue
Medley, Florida 33166-2488
December 2, 2011- City of Sunny Isles Beach
Qualifications Civil Engineering Services
to Design Street and Drainage Improvements
RFQ No.: 11-11-02 - Page 53
Jorge Soto
Assistant Director
Project Coordinator
Utilities & Storm Water Department
Office: (305) 889-1915 ext. 224
Fax: (305) 889-1917
'The Perfect Locationfor Industrial Development"
To Whom It May Concern:
This letter is written in reference to Hadonne Corp. performance as Land Surveyors and Mappers for The
Town of Medley, F.lorida.
The scope of the professional services provided consisted of a Stormwater Drainage Inventory.
These would include the following:
)
. The Location of the all structures Horizontally and Vertically with sub centimeter accuracy by
utilizing GPS equipment
. Unique Structure Identification Number
. Horizontal Coordinates to show specific locations of each structure
. Rim Elevation
. Bottom Elevation
. Photograph of the Exterior condition of the Structure
My experience wi~h Hadonne was positive. The project was delivered successfully on time and in
budget. I would certainly recommend the firm for similar services.
~~
Jorge C So to
lD
-')
\
I
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Ci viI Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 54
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
MIAMI BEACH
PUBLIC WORKS DEPARTMENT, Environmental Division
Tel: 305.673.7080, Fax: 305.673.7028
December 1, 2011
To Whom It May Concern:
The City of Miami Beach has retained Coastal Systems International for Environmental Coastal
Engineering services on numerous projects since 2001. Coastal Systems completed the
engineering design, environmental permitting and construction administration services for the
Bayfront Steetends Project located along Biscayne Bay in the City of Miami Beach.
Coastal Systems designed and secured environmental permits for streetend waterfront
improvements at four (4) locations: 1) Island View Park, 2) South Shore Drive, 3) 10th Street and
4) Lincoln Road. Each streetend consists of bulkhead replacement, streetscape improvements
(paving, grading, lighting and landscaping), and stormwater management improvements. The
scope of services included hydrographic surveys, marine resource (seagrass) mapping,
engineering design, environmental permitting (including Miami-Dade DERM), and assistance to
the City with bidding and contract award as well as construction administration. The total cost of
construction for the Island View Park Project was approximately $350,487, the Lincoln Road
Project was approximately $633,822, and 10th Street is scheduled for construction in March
2012 with a budget of $945,640.
The level of professional services and workmanship provided by Coastal Systems International
met all expectations and displayed a high level of professionalism. If you have any questions or
require additional information, please do not hesitate to contact me at 305.673.7080 or
ewheaton@miamibeachfl.Qov.
Sincerely,
~
Elizabeth Wheaton
Interim Environmental Resources Manager
F:\WORK\$ALL\(1) EMPLOYEE FOLDERS\BETSY WHEATON\GENERAL\Coastal Letter,doc
.-COAS:L
~
,.'~
~, \" .
SYSTEMS
~
~ Ardaman & Associates, Inc. ([j) I
~ C'roochicaJ, EnvirCXlTerla ad H A DO N N E
~. MllenasCorlsUlarts
December 2,2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 55
)
6. OFFICE LOCATIONS
Coastal Systems has assembled a highly qualified team of professionals with demonstrated experience
and qualifications in all of the areas of expertise required to plan, design, permit, and provide
construction administration for the City. Coastal System's organizational stmcture is designed for
efficiency, cost-effectiveness, design optimization, and quality production throughout all phases of
project implementation. We have demonstrated capabilities in managing multiple projects for public
sector clients and coordinating closely with their staff as well as large teams of subconsultants.
COASTAL SYSTEMS INTERNATIONAL, INC.
Corporate Office:
464 South Dixie Highway. Coral Gables, Florida 33146
Tel: 305-661-3655 · Fax: 305-661-1914
Regional Office:
2047 Vista Parkway, Suite 101. West Palm Beach,
Florida 33411
Tel: 561-640-1003 · Fax: 561-640-1009
)
Our team is dedicated to
serving clients using our multi-
disciplined approach with
personalized attention.
Point of Contact:
Mr. Timothy K. Blankenship, P.E.
ARDAMAN & ASSOCIATES, INC. - Sun CONSUL T ANT
Corporate Office:
8008 South Orange A venue · Orlando, Florida 32809
Tel: 407-855-3860. Fax: 305-859-8121
Regional Office:
2608 West 84th St. Hialeah, Florida 33016
Tel: 305-825-2683. Fax: 407-825-2686
Point of Contact
Mr. Evelio HOlta, P.E.
HADDONE CORP. - SUB CONSULTANT
Corporate Office:
1985 N.W. 88 Court, Suite 202 · Doral, Florida 33172
Tel: 305-226-1188 · Fax: 305-207-6845
Point of Contact
Mr. Abraham Hadad, PSM
Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655. Fax: 305-661-1914
Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009
www.coastalsvstemsint.comeinfo@coastalsystemsint.com
)
.COA~...TAL
. .\-- ..
\ '
SYSTEMS
~
..... Ardarmn & Associates, Inc. ([j) I
~ C'roochicaJ, EnvirCXlTerla ad HAD 0 N N E
~. t./aleliasCorlsUlarts
December 2, 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 56
7. CONTRACT FORMS
Coastal Systems Reference Questionnaire's are included on the following page.
)
. Attachment 1: Non-Collusion Affidavit
. Attachment 2: Public Entity Crimes
. Attachment 3:Equal Opportunity/Affirmative Action
. Attachment 4: Conflict of Interest
. Attachment 5: Dispute Disclosure
. Attachment 6: Anti-Kickback
. Bid Submittal Forms
. Acknowledge of Addenda
. Bid Submittal Form
Corporate Office: 464 South Dixie Highway. Coral Gables. Florida 33146. Tel: 305.661-3655 . Fax: 305-661-1914
Regional Office: 2047 Vista Parkway. Suite 101. West Palm Beach. Florida 33411 . Tel, 561.641)..1003 . Fax: 561-640-1009
v..'WW .coastalsvstemsint.come info@coastalsystemsint.com
~ESI
')
NON-COLLUSION AFFIDAVIT
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, Fl 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
STATE OF FLORIDA
COUNTY OFMiami - DacPe
The undersigned being first duly sworn as provided by law, deposes, and says:
This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be
relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid.
The undersigned is authorized to make this Affidavit on behalf of,
Coastal Systems International, Inc.
(Name of Corporation, Partnership, Individual, etc.)
a, Corporation
(Type of Business)
Florida
, formed under the laws of
(State)
of which he is President
(Sole Owner, Partner, President, etc.)
)
Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the
undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any
department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein.
This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired,
connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid, or that such person, firm or
corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication
or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in
the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph
10.2, has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or
to any member or agent thereof.
R. Harvey Sasso
AFFIANT'S NAME
President
AFFIANT'S TITLE
TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this ~ day of December
Personally Known V or Produced Identification
, 2OB1\
Type of identification
(Affix seal here)
l""~Y Pu#'1-
." .
~ -~ .,
?...,~ .'~'~
0, ,,0
Notary Public State of Florida
Vanessa Russi-Machado
My Commission EE017222
Expires 10/14/2014
DECEMBER 28, 2010
1 of 7
~E- ~'b
')
PUBLIC ENTITY CRIMES
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBUC ENTITY CRIMES
PUBLIC ENTITY CRIMES
Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate
who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a
Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a
public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of
real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or
Consultant under a Contract with any public entity, and may not transact business with any public entity in excess
of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on
the convicted vendor list".
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER
OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
11.1. This sworn statement is submitted to Citv of Sunnv Isles Beach
by R. Harvey Sasso, President
(print individual's name and title]
fur Coastal Systems International, Inc.
(pnnt name Of entity submitting sworn statement]
)
whose business address is:
464 South Dixie Hiqhway, Coral Gables, Florida 33146
and (if applicable) its Federal Employer Identification number (FEIN) is 65 - 0543399
(If the entity had no FEIN, include the Social Security Number of the individual signing this sworn
statement: .)
11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1 )(g), Florida Statutes, means a
violation of any state or federal law by a person with respect to and directly related to the transaction of
business with any public entity or with an agency or political subdivision of any other state or with the
United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any
public entity or an agency or political subdivision of any other state of the United States and involving
antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation.
11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1 )(b), Florida Statutes, means a
finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any
federal or state trail court of record relating to charges brought by indictment or information after July 1,
1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere.
11.4. I understand that an "affiliate" as defined in Para. 287.133(1 )(a), Florida Statutes, means:
a.)
b.)
predecessor or successor of a person convicted of a public entity crime; or
DECEMBER 28, 2010
Any entity under the control of any natural person who is active in the management of the entity
and who has been convicted of a public entity crime. The term "affiliate" includes those officers,
directors, executors, partners, shareholders, employees, members, and agents who are active in
the management of an affiliate. The ownership by one person of shares constituting a controlling
interest in another person, or a pooling of equipment or income among persons when not for fair
20f7
-P~E S1
,
market value under an arm's length agreement, shall be a prime facie case that one person
controls another person. A person who knowingly enters into a joint venture with a person who
has been convicted of a public entity crime in Florida during the preceding 36 months shall be
considered an affiliate.
11.5.
I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural
person or entity organized under the laws of any state or of the United States with the legal power to
enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or
services let by a public entity, or which otherwise transacts or applies to transact business with a public
entity. The term "persons" includes those officers, directors, executives, partners, shareholders,
employees, members, and agents who are active in management of any entity.
11.6.
Based on information and belief, the statement which I have marked below is true in relation to the entity
submitting this sworn statement. (Indicate which statement applies.)
x
Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, nor any
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
)
The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of
Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the
State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer
determined that it was not in the public interest to place the entity submitting this sworn statement on the
convicted vendor list. (Attach a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE
PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND,
THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO
A CONTRACT IN EXCESS OF TH RESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA
STATUTES, FOR CATEGORY TWO , CHANGE IN TEl FORMATION CONTAINED IN THIS FORM.
B.
(Signature)
R. Harvey
(Printed ,Name)
Presldent
(Title)
Sworn to and subscribed before me this
1
20~,by
JP
(AF
,,~1PIJ8
R t~
. \ .
WJ- Co. .... ~
'9;;. o;'.\.o~
Notary Public State of F orida
Vanessa Russi-Machado
My Commission EE017222
Expires 10/14/2014
s~nature: Nota~ Pub~ic ^ ~ta e 9f Flgrida
().t\(Y':>~ I(.vt5S. /YI~l--htl\-~
Print or Type Commissioned Name
Personally Known /
OR Produced Identification
Type of Identification Produced
10/1998
30f7
~O~tJ't1 P1J8<;. Notary Public Stale of Florida
:' \ ': Vanessa Russi-Machado
~ c. '. ~ My Commission EE017222
""O;'I'O~ Expires 10/14/2014
')
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
EQUAL OPPORTUNITY /
AFFIRMATIVE ACTION
EQUAL OPPORTUNITY I AFFIRMATIVE ACTION STATEMENT
'P~E ~b
The contractors and all subcontractors hereby agree to a commitment to the principles and
practices of equal opportunity in employment and to comply with the letter and spirit of
federal, state, and local laws and regulations prohibiting discrimination based on race,
color, religion tional region, sex, age, handicap, marital status, and political affiliation or
belief.
Signed:
S)~
Title: President
Arm: Coastal Systems International, Inc.
)
Address: 464 South Dixie Highway
Coral Gables, Florida 33146
DECEMBER 28. 2010
4 of?
p~t:- (0/
J
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
CONFLICT OF INTEREST
CONFLICT OF INTEREST STATEMENT
The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must
disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the
City of Sunny Isles Beach or its agencies.
STATE OF FLORIDA
COUNTY OF Mi ami - Dade
BEFORE ME, the undersigned authority, personally appeared
deposes, and states:
, who was duly sworn,
President
with a local office in Miami-Dade County
of
and principal office in
18.1. I am the
Coastal Systems Intll.
Miami-Dade County
18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No. 11-11- 02 described
as: Lafl6scapc MaifltenaflCc Services. The Affiant has made diligent inquiry and provides the information contained in this
Affidavit based upon his own knowledge.
)
18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has
no financial interest in other entities submitting Bids for the same project.
18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in
any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for
the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and
execution of the Contract for this project.
18.5 Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or otherwise ineligible from
participation in contract letting by any local, State, or Federal Agency.
18.6 Neither the entity, nor its affiliates, nor anyone associated with them have any potential conflict of interest due to any
other clients, contracts, or property interests for this project.
18.7 I certify that no member of the entity's ownership or management is presently applying for any employee position or
actively seeking an elected position with the City of Sunny Isles Beach.
18.8 I certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City
of Sunny Isles Beach.
18.9 In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will
immediately notify the City of Sunn Isles Beach.
\\
, 201ot1:,
Prsldent
,20~.
rJJo
Swprn to and subscribed before me this ~ day of ~'tU~
g' Personally Known OR -11
o Produced Idenl;'cal;on ; Type ~ j{
NOTARY PUBLIC STATE OF FLORIDA ,/ -J.
:It'-tY 011#'1. Notary Public State of Florida
:. .\ .; Vanessa Russi-Machado
~J'~ '. .... ~ My Commission EE017222
0",0 Expires 10/14/2014
DECEMBER 28, 2010
50f7
~tS &> 'L
)
DISPUTE DISCLOSURE
City of Sunny Isles Beach
16070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
DISPUTE DISCLOSURE FORM
Answer the following questions by placing a "X" after "Yes" or "No". If you answer "Yes", please
explain in the space provided, or on a separate sheet attached to this form.
19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the
Department of Professional Regulations or any other regulatory agency or professional associations within the last
five (5) years?
YES
NO x
19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a
contract or job related to the services your firm provides in the regular course of business within the last five (5)
years?
YES
NO
x
)
19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests,
or litigation in the past five (5) years that is related to the services your firm provides in the regular course of
business?
YES NO x If yes, state the nature of the request for equitable adjustment, contract
claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the
monetary amounts of extended contract time involved.
I hereby certify that all statements made are true and agree and understand that any misstatement or
misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid
for the City of Sunny Isles Beach.
December 1, 2011
Date
R. Harvey Sasso, President
Print or Type Name and Title
DECEMBER 28, 2010
6 of?
'J
STATE OF FLORIDA )
)
COUNTY OF Miami-Dade)
~E (og
ANTI-KICKBACK
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
ANTI-KICKBACK AFFIDAVIT
I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid
will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a
commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or
by an officer of the corporation.
"
)
By:
R. Harvey sas~
President
Title:
The foregoing instrument was acknowledged before me this
December , 20~, by
of
person],
as
1
day of
[name
[type of authority], for
[name of party on behalf of whom instrument was
~c~~i~
V (){l (~~ fA- Ri;f>S: fvf~J,.Jo
Print or Type Commissioned Name
executed].
AFFIX NOTARY STAMP HERE:
G..., "Vq
~o v,..
',) ;
"~ '- t. ,f
s J)o O;,\,O
<.,..;
Notary Public State of Florida
Vanessa Russi-Machado
My Commission EE017222
Expires 10/14/2014
Personally Known /. OR Produced Identification
Type of Identification Produced
DECEMBER 28, 2010
70f7
DELIVER TO:
City of Sunny Isles Beach
City Clerk
18070 Collins Avenue
Sunny Isles Beach, FL 33160
REQUEST FOR
QUALIFICATIONS
SECTION 6
BID SUBMITIAL FORMS
OPENING: 10:00 A.M.
12-02-11
PLEASE QUOTE PRICES F.O.B. DESTINATION, LESS TAXES, DEUVERED IN
CIlY OF SUNNY ISLES BEACH, FLORIDA
NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Bid price should be
less all taxes. Tax Exemption Certificate furnished upon request.
Issued by:
Purchasing Agent
Date Issued:
11-08-11
This Bid Submittal Consists of
Pages 20 through 23
) Sealed bids are subject to the Terms and Conditions of this Request for Qualifications and the
accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are
attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk
at the address shown above until the above stated time and date, and at that time, publicly opened for
furnishing the supplies or services described in the accompanying Bid Submittal Requirement.
RFQ 11-11-02
CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS
A Bid Deposit in the amount of 0% of the total amount of the bid shall accompany all bids
A Performance Bond in the amount of 0% of the total amount of the bid will be required upon execution
of the contract by the successful bidder and City of Sunny Isles Beach
Procurement Aoent:
Marcanthony Tu//och
Firm Name:
Coastal Systems International, Inc.
Commoditv CodersJ:
RETURN ONE ORIGINAL AND FOUR COPIES OF BID SUBMIrrAL PAGES AND AFFIDA VIrS
FAILURE TO SIGN PAGE 23 OF SECTION 6 BID SUBMITTAL WILL RENDER YOUR BID NON-
RESPONSIVE
City of Sunny Isles Beach I Request for Qualifications No. 11-11-02
SECTION 6
BID SUBMITTAL FOR:
ACKNOWLEDGEMENT OF ADDENDA
INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES
PART I:
LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION
WITH THIS BID
Addendum #1, Dated November 14, 2011
Addendum #2, Dated
)
Addendum #3, Dated
Addendum #4, Dated
Addendum #5, Dated
Addendum #6, Dated
Addendum #7, Dated
Addendum #8, Dated
PART II:
o NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID
FIRM NAME:
DATE: 12/1/11
AUTHORIZED SIGNATURE:
TITLE OF OFFICER: Director
City of Sunny Isles Beach I Request for Qualifications No. 11-11-02
)
December 2. 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No.: 11-11-02
Page 66
BID SUBMITTAL FORM
Bid Title: CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE
IMPROVEMENTS
The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with
The City of Sunny Isles Beach in the form included in the Contract Documents to perform and furnish all
Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract
Time indicated in this Bid and in accordance with the other terms and conditions of the Contract
Documents.
The Proposers accepts all of the terms and conditions of the Advertisement or Request for Qualifications
and Instructions to Proposers, including without limitation those dealing with the disposition of Bid
Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The
Proposers agrees to sign and submit the Agreement with the Bonds and other documents required by the
Bidding Requirements within ten days after the date of the City's Notice of Award.
In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that:
· The Proposer has familiarized himself/herself with the nature and extent of the
Contract Documents, Work, site, locality, and all local conditions and Law and
Regulations that in any manner may affect cost, progress, performance, or
furnishing of the Work.
· The Proposer has given the City written notice of all conflicts, errors,
discrepancies that it has discovered in the Contract Documents and the written
resolution thereof by City is acceptable to the Proposer.
· This Bid is genuine and not made in the interest of or on behalf of any
undisclosed person, firm or corporation and is not submitted in conformity with
any agreement or rules of any group, association, organization, or corporation;
the Proposer has not directly or indirectly induced or solicited any other
Proposers to submit a false or sham Bid; the Proposer has not solicited or
induced any person, firm or corporation to refrain from Bidding; and Proposer
has not sought by collusion to obtain for itself any advantage over any other
Proposers or over the City.
The City and the successful Proposer will establish completion times for each individual Work Item and
the successful Proposer agrees that the work will be completed within the time frames agreed upon and
stipulated in the individual Purchase Orders and/or Notice to Proceed.
City of Sunny Isles Beach I Request for Qualifications No. 11-11-02
December 2. 2011
City of Sunny Isles Beach
Request for Qualifications
Civil Engineering Services to Design
Street and Drainage Improvements
RFQ No., 11-11-02
Page 67
Firm Name:
Coastal Systems International, Inc.
Street Address:
464 South Dixie Highway
Mailing Address (if different):
Coral Gables, Florida 33146
Telephone No. 305 - 661- 3 6 55
Fax No. 3 0 5 - 661 -1914
Email AddresS:info@coastalsystemsint.com
FEIN No. ~ ~ - ~ ~~_fi_J 2J J..J~
)
the bidder agrees to all Terms
Print Name: T. K. Blankenship
Title: Director
THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO
BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE
INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL
NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY
PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE
PROPOSER TO THE TERMS OF ITS OFFER.
City of Sunny Isles Beach I Request for Qualifications No. 11-11-02