HomeMy WebLinkAboutC3TS
. ORIGINAL
CIVIL E'NGINEERING
SERVICES TO DESIGN
STREET AND DRAINAGE
IMPROVEMENTS
CIVIL ENGINEERING SERVICES
1 TO DESIGN STREET AND DRAINAGE IMPROVE
BID NO. 11 - 11 -02
1
, 1
J
TABLE OF
r --, {::' ~lr:TfTK;::~::~-'-l
I ~;;"e'; :~;;L I
I Li(}- n tt. i\J\. I
C 0 N T E N cr-.~l\1 ! Sunny Isl,esr,l,eao'1
'" ",:;~) of 'ttlO C!t'j (..lod, I
_~... ,..~"...,.,.....,................""".....~~_-"....~.....,........b
I r I LETTER OF INTEREST
,
SECTION
PAGE
I 1
I
1, COMPANY INFORMATION
1
f (I
I
. I
I "'
2, QUALIFICATIONS
6
, I
3, STAFFING
22
. .
4, APPROACH/ METHODOLOGY
45
5, REFERENCES
51
6, OFFICE LOCATIONS
55
7. CONTRACT FORMS
56
1
r I
r ]
r 1
I '1
I
I 'J
t5
COR ZO
CASTELLA
CARBALLO
THOMPSON
SALMAN
ARCHITECTURE
ENGINEERING
ENVIRONMENTAL
PUBLIC RELATIONS
URBAN PLANNING
EB0005022
AAC002142
c I
I
I . f
J
December 1,2011
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
Attention:
Ms. Jane Hines, CMC, City Clerk
Bid No. 11-11-02
Civil Engineering Services to Design Street & Drainage Improvements
Reference:
Dear Ms. Hines and Selection Committee Members,
The firm of C3TS is pleased to submit this proposal for Professional Civil Engineering Services to
Design Street and Drainage Improvements for 174 Street west of Collins Avenue in the Winston Towers
neighborhood.
In preparing for this proposal, our Project Team, led by Daniel J. Grandal PE, a Certified Floodplain
Manager, has reviewed the technical requirements of the project and visited the site to familiarize with
the exiting site conditions. Based on the proposal Scope of Services and our understanding of the
project needs, the critical goals for the project are as follows:
"Complete design development for the construction of a drainage system along 174th Street,
from Collins A venue west to just beyond the first complex curve and consisting of an
interconnected system discharging into a deep gravity well or an outfall or a combination of
both"
To accomplish these goals, we will not only look at providing an interconnected system with deep wells
and/or outfalls, but we will also identify other potential solutions attainable under the project budget. The
existing and proposed drainage systems will be analyzed and modeled using ICPR or other modeling
software to determine the various possible solutions to prevent flooding in the area. Finished floor
elevations, and garage and site elevations will be analyzed to quantify the protection of private property
provided by the improvements in compliance with FEMA CRS guidelines for repetitive loss properties.
We are prepared to work with the City in implementing a value added approach to the project, taking the
opportunity to maximize the design effort for project, and provide a phased multi-year construction
approach to correct the deficiencies of the entire 1741h Street corridor, including pavement conditions,
ADA compliance, improved streetscapping and other general corridor improvements.
We believe that engaging our firm for this project will bring to the City the resources of a multidisplinary
firm with 23 years of experience and over 140 professionals and support staff committed to improving
the quality of life of the residents of the Winston Towers area and surrounding areas. We look forward to
this opportunity to work with City of Sunny Isles Beach on this important project.
Sincerely,
Corzo Castella Carballo Thompson Salman, PA (C3TS)
.~
Jorge E. Corzo, E, CFM
Founding Principal
901 Ponce de Leon Boulevard, Suite 900, Coral Gables, Florida 33134
www.c3ts.com
305.445.2900 800.448.0227 Fax 305.445.3366
Equal Opportunity Employer
~l
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVEMIi
BID NO. 11-11-02
r 1
Name of Agency I Company (including any "Doing Business As" names)
Corzo Castella Carballo Thompson Salman, PA (C3TS)
r 1
I
Company Locations
Headquarters:
901 Ponce de Leon Blvd, Suite 900
Coral Gables, Florida 33134
r 1
I
3996 NW 9th Avenue
Fort Lauderdale, Florida 33309
r ,
I
J
21301 Powerline Road, Suite 311
Boca Raton, Florida 33433
11315 Corporate Blvd, Suite 105
Orlando, Florida 32817
f I
Insert Web Site Address (if any)
www.c3ts.com
, I
l'
Details of Entity Business Structure (Corporation, Partnership, LLC) I Date Founded
C3TS is a locally-based Subchapter S Corporation founded in March 1988 in Miami,
Home Office Address, Telephone Number, and Local Address and Phone Number
901 Ponce de Leon Blvd, Suite 900
Coral Gables, Florida 33134
Tel 305-445-2900
List of any Outstanding Litigation that would Threaten the Validity of the Firm or the Performance of this Contract
C3TS' Pending Litigation cases are as follows:
Rosser v. C3TS: Case number - 09-36103CA 71 Case involves alleged property damage by a homeowner adjacent to a sewer
construction project in Key Biscayne. C3TS provided construction inspection services. Case is currently in early stages of litigation.
(Case opened in October 2009)
, J
Gaitan v. C3TS: Case number - 09-29561 Case involves a death caused while operating a motor vehicle on State Road 821, where
the driver had a seizure, lost control and swerved on to the grassy area until it struck the cable barrier system. The case is currently in
early stages of litigation, (Case opened in March 2010)
Nira Nicole Bar-Zevulun v. C3TS: Case number - 11-05092CA27 Case involved a pedestrian struck by a taxi cab on AlA while
exiting the vehicle at night. The case is currently in early stages of litigation. (Cased open in February 2011)
'1
"1
J
, 1
I
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE
BID NO. 11-11-02
Proof of Insurance (certificates attached)
I" "." .~-;~tf~~~~'~C~-~-J
" 1.
. . I
: r- .;. ,~ , , - . I. ITlLmIiJ[[D)
~_~('~~t_~~4L~ l~_lct:r~ f=~~"I'F
Professional 28-824-96-56 Continental 8/26/2011 8/26/2012 $2,000,000/2,000,000
Casualty
General Liability 12SBCUC6365 The hartford 9/22/2011 9/22/2012 $1,000,000/2,000,000
Excess Liability XHQXY9123SB The Hartford 9/22/2011 9/22/2012 $4,000,000
Castlepoint $1,000,000/
Workers Compensation WCP760687300 1/1/2011 1/1/2012 $1,000,000/
Florida Ins. $1,000,000
Employment D2100 Great American 10/16/2011 10/16/2012 $1,000,000
Practices
Indication of how long it would take to implement service after authorized to begin.
C3TS will be ready to commence the work on this project immediately upon receiving the City's authorization to proceed and complete
the project on an accelerated schedule if necessary, to meet the City's commitments to the residents of Winston Towers.
2
"1
, 1
r 1
1
r I
I
, I
1
I
I
I
I
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVEM" , ff!g
BID NO. 11 - 11-02
O' S\lU
Proof of Insurance
&b~
PRODUCER
CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DDNYYY)
OP ID GT
C3TS-01 09/13/11
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
._lINSURERS AFFORDIN~ COVE~~~~. __ __ NAIC #
INSURER A HARU'QRD FIM INSURANCr. co.
Combined Underwriters of Miami
8240 N.W. 52 Terr, Suite 408
Miami FL 33166
Phone: 305-477-0444 Fax: 305-599-2343
'iNSURE~--------' -------
CORZO~ CASTELLA, CARBALLO
THOMP~ON SALMAN, P.A.
C3TS
901 PONCE DE LEON BLVD. #900
CORAL GABLES FL 33134
INSURER B
INSURER C'
i INSURER D
I INSURER E:
CASTLE POINT FLORIDA INSURANCE
CONTINE.NTAL CASUALTY COMPANY
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING
ANY REOUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS
INSR :ADD'U 1 rJ'RT~1~MJ6~1[~~~~~~'If,~~~n----- LIMITS -----
L TR INSRD TYPE OF INSURANCE POLICY NUMBER
I GENERAL LIABILITY EACH OCCURRENCE J $ 1,000,000
fl COMMERCIAL GENERAL LIABILITY 12SBCUC6365 09/22/11 09/22/12 DAMAGFTO RENTED- -. - -.
A ~!ISESJ".~__o<~re""")_1 $ 300 I 000
[J CLAIMS MADE [!] OCCUR MED EXP (Any OM pe<SOIl) $ 10 , 000
~$500 BI , PD DED PERSONAL & ADV INJURY 1$ 1,000,000
GENERAL AGGREGATE ~,OOO,~
GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OPAGG !~, 000 ,.Q.~
fXl POLICY 11 r;~gi nLOC I
tfMOBILE LIABILITY I COMBINED SINGLE LIMIT 1$
ANY AUTO (Ea accident)
All OWNED AUTOS BODILY INJURY ._____L____
l_.l SCtIEDUlED AUTOS (Per person)
--
~ "'"'''Om" BODILY INJURY I $
I NON-OWNED AUTOS (Per acCident)
PROPERTY DAMAGE 1$
(POi' accident)
I RRAGE LIABiliTY I I I AUTO ONLY. EA ACCIDENT I $
ANY AUTO OTHER THAN EAACC I $
I AUTO ONLY; -~GG r$ .-
filESS I UMBRELLA LIABILITY I EACH OCCURRENCE 1$ 4,000,000
A X OCCUR D CLAIMS MADE XHQXY9123SB 09/22/11 09/22/12 AGGREGATE 1$ 4,000, 000
I -- 1$
tj DEDUCTIBLE I r $
I ----_. ---i~ - __0-
I RETENTION $0 I
WORKERS COMPENSATION .~JTO~yOLI~';!,S i _LJ~:i___
AND EMPLOYERS' LIABILITY Y/N -
B ANY PROPRIETORiPARTNERlEXECUTlVO W02722926-01 01/01/11 01/01/12 E L EACH ACCIDENT 1$1000000
OFFICERiMEMBER EXCLUDED? E l DISEASE. EA EMPLOYEE! $ 1000000
(Mandatory In NH)
~~~h~tS~R~J:m~S below I E L DISEASE . POLICY LIMIT ! $ 1000000
I OTHER I I I
C PROFFESSIONAL LIAB 128-824-96-56 08/26/11 I 08/26/12 PER OCC. 2,000,000
(RETRO 8/26/88) DED. 100,000 I AGGREGATE 2,000,000
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
CERTIFICATE HOLDER IS LISTED AS ADDITIONAL INUSRED WITH REGARDS TO THE
GENERAL LIABILITY.
CERTIFICATE HOLDER
CANCELLATION
Evidence of Insurance
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF. THE ISSUING INSURER Will ENDEAVOR TO MAIL ~ DAyS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE lEFT. BUT FAilURE TO DO SO SHALL
IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER. ITS AGENTS OR
ACORD 25 (2009/01)
@198B-2009 ACORD CORPORATION.
The ACORD name and logo are registered marks of ACORD
3
~l
l
r 1
r 1
J
'1
f 1
, ,
-I
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE
BID NO. 11 -11-02
Proof of Insurance
CERTIFICATE OF LIABILITY INSURANCE
THIS CERTIFICATE IS ISSUED FOR INFORMATION PURPOSES ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE OF LIABILITY INSURANCE DOES NOT AMEND, EXTEND, OR ALTER THE COVERAGE AFFORDED BY THE POLICIES LISTED
DATE: (MM/DDIYVYY) 10/22/2009 INSURERS:
- A: I Discover Property and Casualty Ins. Co.
PRODUCER Marsh USA Inc.
or BROKER: 800 Market Street Suite 2600
St. Louis, MO 63101 B: I
Phone: (314) 512.2415
INSURED: C: I
Corzo Castello Carballo Thompson Salman P.A D: I
21301 Powerline Road, Suite 311 E: I
Boca Raton, FL 33433
THE INSURANCE POLICIES LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD LISTED.
NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE OF LIABILITY INSURANCE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES LISTED BELOW IS
SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGRATE LIMITS SHOWN MAY HAVE BEEN
REDUCED BY PAID CLAIMS.
COVERAGES:
INSURER TYPE OF INSURANCE POLICY NUMBER EFFECTIVE DATE EXPIRATION DATE LIMITS
LETTER
GENERAL LIABILITY
COMMERCIAL GENERAL LIABILITY
CLAIMS MADE
OCCURENCE
--------~----------------------~~--------
AUTOMOBILE LIABILITY Combined Single Limit: $1.000.000
U ANY AUTO
DALL OWNED AUTOS D187AOO016 5/17/2011 5/17/2012 Bodily Injury per Person:
A :';;1 SCHEDULED AUTOS 126801
21 HIRED AUTOS Bodily Injury per Acc.
:~] NON-OWNED AUTOS Property Damage:
:;;;'I"See Below
GARAGE LIABILITY
ANY AUTO
,-
EXCESS LIABILITY
UMBRELLA
OTHER Than UMBRELLA Form
WORKERS COMPENSATION AND
EMPLOYERS' LIABILITY
DESCRIPTION: VENDOR ID: 120 GPBR: 41
Policy provides protection for any & all operationsfjobs performed by the named insured. Certificate holder is included as an additional insured where
required by written contract. "Any vehicle leased from Enterprise Fleet Management where the contract includes auto insurance coverage. Waiver of
Subrogation included where required by written contract. Insurance is Primary and Non-contributory. 6J'~ -o",p:;.t-i-J
HOLDER: AUTHORIZED REPRESENTATIVE
Evidence of Insurance - CANCELLATION:
SHOULD ANY OF THE ABOVE POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF. THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS
t:Vloence 01 Insurance WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LI:t-T, BUT
FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND
UPON THE INSURER. ITS AGENTS OR REPRESENTATIVES.
4
iC Copynghl Moonlll Enterprize> 1999.2003. All Rights Reserve<l
Form# CVla.l012512002
'1
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVEMIi:!
BID NO. 11 -11-02
Corporate Licenses
r 1
r 1
State of Florida
Department of State
, 1
I certify from the records of this otlice that CORZO CASTELLA
CARBALLO THOMPSON SALMAN, P.A. is a corporation organized
under the laws of the State of Florida. tiled on March 30, 1988, effective
March 28, 1988.
The document number of this corporation is K 196] 2.
. ,
J
I further certify that said corporation has paid all fees due this otlice
through December 31, 20 II, that its most recent annual report was filed
on January 4, 20 II. and its status is active.
I further certify that said corporation has not tiled Articles of
Dissolution.
.1
, I
~tnt:e of (!Ifln~~lt
'l8unr~ uf '![ugiueers
Corzo Castella son Salman, P.A.
i
l.iil't'll ullder 111)' "lIl1d tllld lite (irel
Floridll, al TlIllalllLul!e, Ihe ClIpilll
tlll)' of }(///lI/IT)', 1011
Certificate of Authorization
-~-
Secretary of Stn
ExPIRATION: 2/2812013
AUDIT No: 228201303105
CA. LIe. No:
5022
To 'l\llh~ntlc"tc this ct"rtifIC,lIOC:,\'lslt the Inll,)wmg ~II
II). illll.llh"''flI~llh)\\' lh\,.' Lru>lruclion~ dL'pluyoc:d
h I Ips: lI~n II', s II n hiz. 11 rWI-~ 1'1" III h \.~ ,', h
~tnt:e of (!Ifln~~lt
~unr~ uf ~ugiueers
..\ullll:ntlcn!lllfl II) JIIOI K9299UKJ-OI0511-K196
Certificate of Authorization
EXPIRATION: 2/28/2013
AUDIT NO: 228201302463
CA, LIe. No:
7274
A!;. .5400281
STATE OF FLORIDA
, -
DIPAR'1l~ ogpB~ElIUi&llR.. Pf:rMl!lyg~LnU~8It'TI0HSEQ' Lt 10tOtO t012
Rag~llli8r
DISPlAY AS REQUIRED BY LAW
CHARt.tl LItH
SECR&TARY
5
~l
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE
BID NO. 11-11-02
r 1
r 1
. ]
. 1
./
I 1
I
. J ./
~ 1
I ./
l j
. 1
./
, I
I'
, ,
C3TS is uniquely qualified to execute a successful project and provide you with exemplary service for several reasons. The team we
have assembled to perform on this project is unique in its depth of relevant, local and successful experience, The C3TS team prides
itself on the success of our past projects many of which are similar in size and scope to this project. Our repeated success is a result of
our unique philosophy that guides our approach to every project.
Why do we think that we are the best qualified to perform these services?
./ Because of our team is led by Certified Floodplain Managers
./ Because of our extensive experience working in Coastal communities with many success stories including our recently
completed. major infrastructure improvement projects at Golden Beach, North Miami Beach and Key Biscayne to name
a few.
Because we can work as partners and hear from you about the lessons learned from your recently completed Center
Island Stormwater Improvement Project.
Because we perform our work using state of the art technologies such as 3-D and digital terrain modeling that could
interphase with the City's present of future GIS based mapping system.
Because of our value added approach to service that will provide you with solutions that extend beyond the limited
scope of the project, maximizing your design investment to include an analysis of pavement conditions and
infrastructure improvements for the segment between North Bay Road and Collins Avenue.
Because we understand your residents' concerns and are willing to work hand in hand with the City in the development
of a project website and incorporate into the project the requirement to use mobile messaging informational signs
during the construction phase
IN ADDITION
Our extensive local experience with similar drainage systems with a combination exfiltration trenches and pump stations sets us apart.
Our experience includes successful drainage projects for various municipalities in Miami-Dade County for the last 20 years. Our
professionals understand the drainage and geotechnical conditions in Miami-Dade County and are extremely familiar with permitting
requirements including Miami-Dade County DERM and SFWMD,
The C3TS team also specializes in the retrofit of existing drainage systems including pump stations, wells systems and exfiltration
trench systems. We take systems that are not working as designed or in need of redesign and optimize the drainage system making
the most of the available funding. We take a holistic approach to the project and use the available funding in a manner that will protect
your initial investments in this area.
Our team is also experienced in handling projects where limited funding is available and prioritizing the project for a multi-year phased
construction is required. As an added value service, our in-house grants division can also search for available funding that can
augment the existing project funds. We have been extremely successful in securing funds for municipal projects.
Our team includes in-house Construction Management division with direct relevant experience of similar projects in and near the
project area. This team works hand in hand with the design team to provide seamless project delivery and ensure that the design
criteria and goals are fully understood by the contractor. The design team will remain fully engaged in the review of shop drawings,
response to RFI and day to day construction progress. Our inspectors are engineers so also have the knowledge necessary to make
field decisions in compliance with the project goals in order to keep the contractor moving maintaining the project schedule. The entire
6
r 1
I 1
I
r 1
r 1
I
J
r 1
, I
~ 1
J
, I
I I
1
i
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE
BID NO. 11-11-02
team is extremely attune to the need of minimizing contractor change orders and scope creep in order to meet the project funding and
schedule requirements.
Our ability to execute successful projects time after time is due to our design philosophy, The C3TS design philosophy is to create and
maintain a professional and attentive relationship with our clients, focusing equally on their needs as on their project's solutions. It is in
the project solution that the "C3TS Philosophy" of project execution is unique. From its founding, the C3TS philosophy of design is to
fully integrate within its internal resources all of the disciplines and experience needed to achieve a holistic solution which maximizes
value to the client. These values include the functional, aesthetic and cost values associated with each project. C3TS is committed to
excellence in providing professional design services resulting in complete solutions for our clients, and results in over 95% of our
workload coming from repeat clients.
To us the most powerful building blocks are vision, imagination, dedication, and a determination to succeed. We make a commitment
to our clients, from the very beginning of the relationship, to the time and talent of our principals and staff; to be sensitive to the
nuances and nature of their core business; and to deliver high quality service and projects on time and within the established budget.
We encourage you to ask any of our clients who can share the responsiveness, attention to detail and successful projects that we have
accomplished with them.
The C3TS Team understands the importance of creating solutions that get the projects done, Analyzing the scope requirements and
looking beyond to understand what is required to achieve a successful project, whether we apply value engineering measures or
recommend measures that save the City long term operational cost, the goal is always to "maximize the value of each project".
Special attention to budget and schedule requirements assures that projects are delivered ON TIME & ON BUDGET! We are
committed to planning each project to meet the budget and schedule constraints.
We have assembled a multi-disciplined team of engineers to address the challenges posed by the project under this contract. Our
team offers the City Sunny Isles Beach extensive relevant design experience, strong local expertise, and effective project management
capabilities.
We are committed to providing you with full Engineering Services including studieslanalysis, survey, geotechnical, programming,
bidding, construction, and post construction services.
The following is a summary of the reasons we feel our firm is uniquely qualified to handle any aspect of this contract:
../ C3TS Team has a record of Design & Technical Excellence on similar drainage projects
../ C3TS Team is committed to providing excellence in service to our clients
../ C3TS Team has strong Planning & Programming skills
../ C3TS Team has experience with expedited project delivery
../ C3TS involves the firm Principals in every project small or large
../ C3TS Team has a proven track record of successful project delivery and implementation
../ C3TS TEAM IS LED BY CERTIFIED FLOOD PLAIN MANAGERS!
7
r ]
r 1
r 1
r 1
, 1
I
. 1
I
I
. I
~ 1
" ,
Zen
C>I-
-z
~w
:I:o::!E
uow
<(I->
wenO
[OwO:::
enuc..N
w_::!Ec
...J>-'
enO:::w~
-wc>.
>-en<(~
zc>Z'Il:
zZ<l:O
=>-o:::u..
en 0:::0 0:::
u..lflo
ozz
~a<(
-ZI-
uww
...Jw
-0:::
>1-
(3 en
I j
1.1
-!"
ii I
~i
~ll
I'
jgl
i"I'
I
I,
11
I!
I~I
j I
~
! I
loi
~:"!
~: I'
0,
~i'
, 1
I~
~
i I
I'l'
1"1
I.
rl
iJ
-i.'ll'
ij
~II
1'1 !
I, ~
H !!l
I >
I! ~
,J ~
I'~i ~
I u
H~ I
IJ~ ~
~i~l~ ~
~i I:~ ~
~i .
. i~ ~
~l~ i
u:: ~ I-
W
<n
"
it
l1
~
;;
~
..
z
"
~
ij'j
~
"
u
"
iii
" W
~ g:
<n=
"
ffi
>
"
"
z
"
"
<(
"
~ In
W W
~ ~
~ ffi
" <n
" J
~ ~
g %
~ M
i= 2
" "
~~
N N
~ ~
U '<I" <:t "<t
~ ~ U. lL u..
~ N ~
~ '" '"
c c c c
~ ~ ~ 0
"
'"
~
~
!;:
"
u
~
"
'"
~
"
c;>
.
c
'i
"
~ .
.
0
. .
>- :>
~ i
;n ;n
[ [
0
" ~
~ ~
5 .
Q.
~ UJ
E
~ "[
I .
~ 0
.
0: :>
~
>- ~
z
"
~
:;
iii
"
"
[]
W
'"
"
~
~ UJ
>
UJ "
> "
" l1
"
w ;;:
>- '"
!i1 "
;:
" ~
. .
>- >-
i~ N N N N N N N N N N N
~ ~ ;; " ~ " ~ '" ~ ~ '" ~ '" M ~ ~ ~ ~ '"
ffi!~ ~ " " '" '" '" '" ~ ~
. c u " ~ '" '" ill u '" - - . .
U)l~ .= 0 0 ~ 0 0 0 c 0 0 0 0 . 0 >- u ~ , >- >- >- . c c c >- >-
" " " " " 0 >- , >- ~ >- ,
I " " " " " >- " >- ~ ~ ~
l~ >- >- >- >- . . >- >- . .
. . 1'i . . . >- . . >- . . . u u . .
2~ . u u u u u u u u
u u u u u u u u u u u u
~.o " ;;; ;;; '" " " '" '" '" '" '" '"
01
I I
~ ~ ~
tJ) ~ ~
~ ~ ~ ~
>- W Z ~ ~
~ ~~ ~ ~~ W
~ ~~W~(I) ~ ~ ~~CW ~
~~UlO W iE I- i= ~Z~
U ~ ~ ~ I ~UJ ~ Z ~ ~ UJ~~ ~ WUJ ~ ~ ~ ~ ~Q. ~ ~ .
I~ ~ ~ ~ ~ ~ 5 I I I ~ I ~ UJ I ~ I ~ ~ ~ ! ~ i: ! ~I
~Q.~ ~w w~ I ~ ~ u~ >~ ~ ~ ~,,5 ~ ",i ~ ~ ~ ~" u~ ~ ~ ~ ~ ~ ~ ~ Q.~ ><( ~z:
10 ~ ~ w 0 ~ w w : ~ 0 z ~ ~ ~ w 0 z ~ 0 ~ ~ ~ ~w 1_ ~UJ ~ ~ 0 .
~II- U. ~ q u _ I- > Q ~ u ~ tJ) ~ ~ ~ u ~ ~ I- ~ tJ) ~ z 0 ~
llIW~Z~~~@~~ ~~Q~[ijo~~ ~o wo::,
~g~Qn.o..::>"'U)a owQ)ooc~~u (I)~....o
~ ~ ~ ~ ~ [ ~ ~ ~ 8 ~ ~ ~ ~'
"!r;""TTlT---':Tl~-Cl.-C1TiJ:l:T1.::'C'!",:,,, [ !",!~ 1.,'1::-
-:~ l~ !~ ~ I~ jW !~ !~ m J~ l~ ~ j~ I~ I~ ,~ :~ I~ i~ IN IN iN IN iN iN IN jN iN iN 1M !M
%
U
~
~
>
Z
z
iil
~
"
~
U
l
rl
r 1
r 1
, I
, J
I
'l
. J
I . J
I ~ J
I
I
i L ~
I
I
, I
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVEME ";jf~{
BID NO. 11 - 11 -02
Golden Beach Capital Improvements - Master Planning, Design & Construction Phase Services
Golden Beach. Florida
This comprehensive Capital Improvements Program Master Plan focused on three major improvement areas:
Town-wide Drainage Improvements - These improvements included design review, costs analysis, and recommendations based
on the Town's existing stormwater master plan which includes construction inlets and culverts to collect and direct stormwater
runoff to pumping stations discharging into the intracoastal waterway.
Utilities Underground Relocation (electrical, telephone, cable) - These improvements included a thorough analysis of the
Town's existing power system configuration, and close coordination with FPL and other utility companies in developing a
conceptual plan for burying all utility transmission and distribution lines throughout the entire Town.
Town-wide Streetscape & Traffic Calming - The Town's major thoroughfares and side streets were redefined and enhanced to
increase public safety, and improve the quality of life and aesthetic appeal. Improvements included highlighting intersections with
concrete pavers and crosswalks, delineating of roadways with valley edge gutters, construction of traffic splitter islands and center
median with new landscaping, and new lighting.
The Master Plan carefully considered the each of these with respect to feasibility, cosUbenefit, and design, as well as an analysis
of funding options and scenarios, and schedule for phasing and implementation.
9
r 1
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVEME 'J~ .
BID NO. 11- 11-02
rl
'1
r 1
Belle Meade Drainage Improvements and Stormwater Pump Station Design
Miami, Florida
r 1
I
Belle Meade is a 60-acre, single family, residential neighborhood located in the northeastern portion of the City of Miami adjacent
to Biscayne Bay, Over the years, problems with the inadequate drainage infrastructure, tidally influenced groundwater, site
elevation, and deteriorating streets created a condition of moderate to severe flooding in the area. C3TS performed a drainage
study and best alternative drainage solutions for the Belle Meade area. The model was run and calibrated based on existing
conditions. Design iterations were then input into the system and evaluated against the City's design criteria. The final design
recommendation was a 120 cfs pump station with approximately 4,000 feet of collection system.
, 1
J
Following the study, C3TS provided the design and permitting of the drainage and streetscape improvements encompassing
several miles of road in a developed flood-prone neighborhood providing quality treatment through the use of exfiltration trenches
and storm water treatment units and discharging through a large stormwater pump station to the Little River Canal. Permitting
included pre/post computer modeling and stage calculation for Miami-Dade's Class II Surface Water Management Permit.
rl
._ J
. 1
-j .,
10
~l
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE, G~Ui ,.".
BID NO. 1 1- 11-02
Palmetto Bay Villagewide Drainage Improvements
Palmetto Bay
This project involved field surveying, design, permitting, bidding, and construction administration of drainage improvements at 10
locations throughout the Village. These 10 areas were identified by the Village as having flooding problems, The improvements
included new drainage structures, exfiltration trenches, outfalls, and asphalt overlays. The project was completed on schedule and
under budget.
, t
t
I
.1
J
, 1
. J
. J
11
'1
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVEMIE, . ill
BID NO. 11-11-02
rl
, ]
r I
, 1
Highland Village Neighborhood Improvements
North Miami Beach, Florida
I .
Highland Village is a residential mobile home park located in the City of North Miami Beach, Florida adjacent to the Biscayne
Bay Aquatic Preserve with over six hundred low-income residents living in this community. The neighborhood was
experiencing septic tank failures due to low site elevations and high groundwater levels resulting in human waste pollution of
the adjacent wetlands. C3TS conducted preliminary environmental and hydrological studies, planning, and final design of
wastewater and stormwater management systems. A multi-phase construction approach allows Federal funds to assist in
funding the construction of wastewater collection and transmission system to replace septic tanks, and an area-wide
stormwater management plan that includes overflows to wetlands and excess runoff pumping into surface aquifer
wells. C3TS prepared a NEPA Environmental Information Document to substantiate the need and specify the use of these
funds.
The first phase of the stormwater management component includes the installation of 4,500 LF of drainage pipes, three
stormwater treatment units for separation of solids, a below ground stormwater pump station using electrical submersible
-verfiCafmiXed-ftow pumps' (2'}00 gpm capacity at 18-feet TDH, 30 HP, and abrasion resistant impeller) using 30-inch
diameter tube, discharging to a 24-inch diameter x 200-foot deep well. Stormwater pretreatment consists of solids and
sediments separation accomplished by a 6-foot diameter x 16-foot deep stormwater treatment structure that uses gravity,
centrifugal force, and separation screens. Oil and grease are also separated hydraulically prior to entering the pump station.
The pump station is controlled via adjustable floats, an automatic controller with stand-by generator connection capability,
and telemetry, which is connected to the City's system. The City operates a stormwater utility, which is outfitted with portable
electrical generators. The pump station can also be by-passed and portable pumps installed to pump directly into the open
well pipe, which is connected to an overflow that limits the head of water that can be placed upon the well. The design allows
for each pump station to be connected to up to 3 wells via a manifolded pipe, allowing each well to be valved off and to either
work in parallel or independently from the others. Phase 1 construction, however, limited the work to a single pump station
and a single drainage well.
In addition to the new Pump Station and drainage well, four existing outfalls located at the east limits of the project and
discharging to Oleta River State Park were retrofitted with Pollution Prevention CDS structures that are operated and
maintained by the City's stormwater utility avoiding any potential adverse impacts to the protected mangrove areas.
t-,
I .
~J
III!
12
rl
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE
BID NO. 1 1 - 1 1 -02
rl
, 1
Old Cutler Road Improvements (SW 97th - 87th Avenues)
Cutler Bay. Florida
C3TS was contracted by the Town of Cutler Bay as prime consultant to design improvements for the portion of Old Cutler Road
between SW 97th Avenue and SW 87th Avenue, The project consists of roadway improvements, traffic circles, pavement
resurfacing, sidewalks, French drain facilities, medians, landscaping and lighting. Old Cutler Road is designated a historic roadway
which required all improvements to respect the existing roadway footprint, thus limiting the modification and/or additional widening
of the road. This Miami-Dade County roadway is considered an arterial collector roadway. The proposed configuration for Old
Cutler Road will include roundabouts at each end of the corridor for traffic calming and beautification. The 1.24 mile corridor
between these two roundabouts will be a two lane roadway with turn lanes, landscape medians and scramble lanes, Permitting
including Miami-Dade County Public Works DERM and Town of Cutler Bay,
, ,j
~ ~il
~-Q: ~~~ ~:'ZS. 1';, ~
'!OJ. '" ~.
l~w'i' ~
1? '. ~
.~, t',.~
Jj.o ~j
~. ,
L....-:. .~.. "",, ~ ",-..
':" '," _'_'o' ~>,,_!,,~~!;~;~O:"',-~\ ,:"<:..'t~j~-,~q;-'~''0:(ft,;;:;"'''-Y'-f:~f:':
. ~~;~1i~t~~~Z~~~'1~~DtI~ifilWJl'L
13
~l
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE~'~ 'lji"
BID NO. 11- 11-02
Miami Lakes NW 82nd Avenue Street and Drainage Improvements
Miami Lakes. Florida
C3TS designed approximately 1 mile of arterial (section line) roadway on NW 82nd Avenue from NW 1541h Street to NW 170th
Street. Drainage design included inter-connected exfiltration trench with positive outfall to the canal system and beautification
improvements including asphalt overlay, repair of curbs and sidewalks, striping and signage (landscaping and irrigation - by
others). Drainage in some areas was minimized in order to protect the existing landscaping. The scope included utility
coordination, maintenance of traffic, construction support services and permitting through DERM and Miami-Dade Public Works.
I 1 The project was completed ahead of schedule and within budget.
J
, I
. J
q
I
I J
: ]
~ 1
: I
, I
, I
. ,
, J
14
rl
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVEM M ,~$W.
BID NO. 11-11-02
1
r 1
r 1
r 1
, 1
Miami Dade DERM Quality Neighborhood Improvements Projects
Miami-Dade County, Florida
Miami-Dade DERM QNIP - Leisure City - C3TS designed a stormwater system for an existing 160-acre flood prone residential
neighborhood within a well field. Proposed design removes all existing slab covered trench and upgrades the drainage system to
current Miami-Dade Public Works and DERM standards. Runoff within the well field had to be conveyed outside the wellfield cone
of influence to treat for quality and quantity considerations,
Miami-Dade DERM QNIP - Brentwood and Leslie Estates - C3TS designed stormwater improvements for a residential
neighborhood including a major arterial roadway. The design consisted of an exfiltration trench system with an outfall to a canal
and resurfacing of the roadways, The total project cost of the project was $1.0 million.
· 1
. 1
II
I
I I
Miami-Dade DERM - Allapatah Phase II - C3TS provided stormwater improvements to a residential neighborhood including
major arterial roadway. The drainage facilities included interconnected French drain systems,
, I
. J
, I
I I
. ,
- I
l J
A~..~'
15
rl
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVEMIi . J; ,,'
BID NO. 11 - 11-02
Midway Pump Station
Miami, Florida
C3TS was retained by Miami-Dade County to design and permit a stormwater pump station and forcemain under the SR 826
discharging to the North Line Canal through an energy dissipating structure and outfall. The pump station will transmit the runoff
collected from the existing collection system to the North Line Canal through directionally bored twin 24-inch diameter carrier pipes
in two 36-inch HDPE casing pipes that cross under FOOT's SR-826 Expressway, The system was modeled resulting in collection
system improvements to provide adequate flood protection to the area, including additional exfiltration trenches (French drains).
-(
.1 '..
....
....
..,'1
''i
.<;.
....
__.1'. ,
,t "UM"" ST^T'ON ,~BI~^N
1'-- .-
"
::'
II
I'
I
"
L'::
it
- J: .. I: '
~
, .
I'
tE
:::.:::;.",,,,.:,-
16
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVEMIi 'ill
BID NO. 11-11-02
Basin D-8 Pump Station Drainage Improvements
Town of Palm Beach, Florida
C3TS was selected to evaluate and design improvements to the existing D-8 drainage basin in the Town of Palm Beach
comprising 250+ acres of residential neighborhood and roadways, Specific tasks included evaluation of existing basin utilizing
ICPR modeling techniques, and full design plans for basin-wide drainage improvements. Additional duties included surveying,
underground soft-dig utility locates, utility relocation, geotechnical investigation, and permitting through the South Florida Water
Management District (SFWMD),
(fi)
. ,ffi.7<~5
26
27
,29
_.___PJ'i<-. ~ _ _Ql:___ ~8
FARU~""'~ d~'
'.~' 1<0'
'll ';5 ~1_oJ.
'.\'R
, 0,,-
..,/'" .. -.,.-..... .. ~ill
63 62
61
'01 ~ ---
60
: ~ l
~t:n -:.- - /-:--
;;,;.:~h.'!: Ittr---
tt ~..
=--./1: ll;:;:"~,___._ -....
'~='~""""~- -...---'?:'"
i i !
~:'~<~iL;=~c=,~~-~-~~:-~ijk~;~:--J
, _..><,:;.....~.....- '
. ~~7'jl i "'i.. -';"":::'~. .
~ 1 ~m_.__._..;;-;;---;= =:i;::: !:;:;}:~_:"~-~
-... f _<w ""...1 i i
_ _'._____ _________________________l__ L._ ..
.c.o.l.O-J..l.U4.o.~"""'"
.- ~ .. -- - - ~- -.
. ~ .,....:~~._ . _0 ~..~ _._ __~ _'~_ _. _ ._ .', m..u, .._~ "'._U _~._:.. . _.. ~I . ~ . -<" ,_ ~~ I -..,
tE~{:.ii~.G~~~;~~~:~ ~:~ ff1~ 0 TO"CH~MlUC" =~:::;:~~H !~;
17
~.l
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE ,IE' r;g
BID NO. 11-11-02
o I ~ .,11
Grove Park Drainage & Roadway Improvements
Miami, Florida
C3TS was selected to provide all project management and engineering analysis services necessary for preparing a General
Development Report for the Grove Park area in the City of Miami. The Grove Park project area is defined as the area bounded by
NE 7th Street, W. Flagler Street, NW 17th Avenue and NW 22nd Avenue. The intent of the General Development Report is to
evaluate the existing road and drainage conditions, develop alternative improvements and cost estimates, and to recommend
apreferred alternative. The alternatives must be formulated based on comprehensive roadway analysis, drainage analysis, public
< 1 involvement, and research of existing rightof- way, permits and permit criteria, and flood complaints.
J
The roadway analysis will include evaluation of milling and resurfacing requirements, damaged sidewalk and/or curb and gutter
. 1 replacement, ADA pedestrian ramp requirements, and sodding regardinglresodding requirements (for roads within limits of
I proposed drainage improvements).
'1
I
, J
I I
, I
, J
L )
~ I
I
, I
. J
19
r]
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE
BID NO. 11-11-02
1
~l
r 1
,
I
f 1
j
1
j
. I
I '1
I
, 1
. J
N.W. 82nd Avenue Improvements
Doral, Florida
C3TS was contracted by the City of Doral for the design of NW 82 Ave, between NW 12 St and NW 25 St, which is a four lane
divided road way located within the City of Doral's industrial/commercial area. Improvements consist of milling and resurfacing,
installation of approximate 1500 linear feet of infiltration trench, sidewalks and curb and gutter repairs, This project is still in its
bidding phase.
Redevelopment of Gravity Drainage Wells
Key Biscayne, Florida
This project involved the cleaning, rehabilitation, and redevelopment of 30 existing gravity drainage wells located throughout the
Village. Responsibilities included inspections, management, and conducting testing at each well to ensure expected discharge
capacity was achieved, The work was funded by a grant from the South Florida Water Management District.
20
1
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVEMIi.'~
BID NO. 11-11-02
Basin A & B Pump Stations
Lauderhill, Florida
Basin A - C3TS provided engineering and construction administration services for this three-pump stormwater pump station. The
project required two 40,000 gpm line shaft axial flow pumps with 145 hp natural gas caterpillar engines and a third pump provided
for back ups, Pumps operate in a automatic mode and start when storm stage levels rise, The facility includes a reinforced
masonry structure that houses the engines, and controls the generator and communications equipment. The project was
constructed within budget for $1.6 million. Included with this project, C3TS prepared the preliminary engineering report. Capacity =
78, 800gpm (175 cfs) @ 7.5'TH (three pumps - 39,400 gpm each, one as backup), Additional services included: preparation of
design drawings, including survey, civil, mechanical, architectural, structural, electrical, instrumentation, and communication; gas
driven engines; engine driven axial flow line-shaft pumps with right angle gears; stand-by auxiliary generator for instrumentation;
submerged keel water cooling system; 2 telemetry systems, SFWMD system's SCADA controls and City's SCADA; ventilation fans
and blowers; trash rack and flap - gate discharges; architectural treatment to conform to the City's design; preparation of
construction specifications; assisted City in bidding (low bid 1 $1.6 million); and inspected construction & field tested the facility for
acceptance; certified to the city, state, & South Florida Water Management District. Project was under budget and within time
allotted.
, J
, J
Basin B - C3TS is providing engineering and construction administration services for this two-pump stormwater pump station. The
project required two 44,000 gpm line shaft axial flow pumps with 145 hp natural gas caterpillar engines and a third pump provided
for back ups, Pumps operate in a automatic mode and start when storm stage levels rise. The facility includes a reinforced
masonry structure that houses the engines, controls the generator and communications equipment. Included with this project,
C3TS prepared the preliminary engineering report.
Additional services included: Preparation of design drawings, including survey, civil, mechanical, architectural, structural, electrical,
instrumentation, and communication; Gas driven engines; Engine driven axial flow line-shaft pumps with right angle gears; Stand-
by auxiliary generator for instrumentation; Submerged keel water cooling system; 2 telemetry systems SFWMD system's SCADA
controls and City's SCADA; Ventilation fans and blowers; Trash rack and flap - gate discharges; Architectural treatment to conform
to the City's design; Preparation of construction specifications; Assisted City in bidding (low bid / $2.1 million); and inspected
construction & field tested the facility for acceptance; Certified to the city, state, & South Florida Water Management District.
bm ._~
eJ1tIE.awtrJL 7C00'Ut. n~np'~
21
1
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE
BID NO. 11-11-02
l
~ I
, 1
I I
~ ]
.= Jorge E. Corzo, PE, CFM
.Iml Principal in Charge
.- Daniel J. Grandal, PE, LEED AP
.= Project Manager
.- Ramon Castella, PE, LEED AP
.= Division Director
ti STREETSCAPE
ti
DRAINAGE &
PERMITTING
'-I
Diana Sudasassi, PE
Traffic Calming
Carlos Herdocia, PE, LEED AP
Signalization / Signing &
Pavement Marking
Richard Blanco, PE
Streetscape Design
Edward J. Dvorak, PE, CCS
Senior Drainage Engineer
Emesto Farbegas, PE
Senior Drainage Engineer
Dave Clarke, PE
Drainage & Permitting
Tom Ruiz, PE, CFM, LEED AP
GIS / Drainage Specialist
Rodrigo a. Rodriguez
Senior Project Engineer
:E lID5;[1l1~'1:u.'IJ :(;l'll~11 ~[tt~'1:1 ~.'J[~i:j
, I
I
c ,
I' :1
, i I I I
f I CONSTRUCTION TRAFFIC ENGINEERING ENVIRONMENTAL
l J MANAGEMENT
, 5ean Compel, PE, LEED AP Silvia Beltre, PE Jeffrey S. Marcus, PhD.
I Construction Manager Senior Project Engineer Senior Environmental Scientist
l ,
Danilo Caicedo, EI Godfrey A.a. Lamptey, PE Nicole Carter, MS
Senior Inspector Project Engineer Senior Environmental Scientist
. !
Desir Jacques, PE
. Project Engineer
, .
-
PLANNING I GRANTS
Ralph Rosado, AICP, CNU-A
Grants & Funding Director
SUBCONSULTANT SUPPORTING SERVICES
- I - - I
([f) SURVEYING
Hadonne, Corp.
Abraham Hadad, PSM
Senior Surveyor
Eduardo Suarez, PSM
Senior Surveyor
lrerracon
GEOTECHNICAL
Terracon
Hugo Soto, PE
Senior Geotechnical Engineer
Julio De Bias, PE
Project Manager
22
rl
~l
r 1
r 1
I
1
. 1
__COR ZO
_CASTELLA
CARBAllO
r;x;rn THOMPSON
muSAlMAN
JORGE E. CORZO, P.E., CFM
Principal in Charge
EXPERIENCE
Mr. Corzo with over 32 years of experience in civil engineering has held a variety of positions from Senior
Project Manager to Chief Engineer and Principal in Charge. His expertise in a majority of civil engineering
specialties such as highway design, utilities, drainage design and construction management brings an in-
depth experience base which allows him to look at the overall project to insure that a quality and cost
effective product is being delivered. This background provides the necessary experience for running an
extensive quality assurance plan. Some of the projects he has been involved in include:
Highland Village Neighborhood Improvements, North Miami Beach, Florida - Principal in Charge
for a $6 million dollar neighborhood improvement project in a low lying area of the City of North
Miami Beach with extensive flooding and water quality problems resulting from failed onsite septic
systems. The project included design of a pumped deep well disposal system, design of a wastewater
collection and transmission system, including a new pump station and force main, design of roadway
and site improvements, preparation of construction plans, permitting and preparation of grant
applications seeking financial assistance to complete the project.
Basin "B" Stormwater Pump Station, Lauderhill, Florida - Senior Engineer Responsible for the
design and specifications for a 2-pump stonnwater pump station. Project required a 44,000 gpm line
shaft axial-flow pump with a 145 hp natural gas caterpillar engine. Second pump is a back up. Station
operates under an automatic mode. A reinforced masonry structure houses the engines, controls,
generator, RTU, etc. Projected cost $2.3 million.
. CDBG Street & Drainage Improvements, Sweetwater, Florida - Principal in Charge for an on-
going multi-phase, multi-year project consists of the widening, resurfacing, landscaping and provisions
of drainage systems for deteriorated local city roads. Over five miles of roadway have been improved,
representing approximately 25% of all roads within the municipality.
.
.
. Opa-Iocka Street Improvements Program, Opa-Iocka, Florida - Project Manager for the
preparation of roadway plans for the rehabilitation of approximately 0.5 miles of city streets through a
Safe Neighborhood Block Grant. These projects included resurfacing, drainage improvements, lighting,
utilities and landscaping.
. Funding & Analysis for Booster Station No.1, Medley, Florida - Analysis of pump stations and
force main manifolded system, and design of a proposed Booster Pump Station facility, in response to
the operational changes by MDW ASD, in rerouting flows to the North Regional Wastewater Treatment
Plant. This project was funded by the State Revolving Loan program.
. Master Water Meter, Medley, Florida - Project Manager for a master water meter for the Town of
Medley with Miami Dade Water and Sewer Dept. and Dade County Public Works Department,
preparation of construction plans and specifications for the installation of a master water meter.
. Capital Improvement Program & Yearly Updates, Opa-Iocka, Florida - Principal in Charge for
the development of a Capital Improvement Program (and yearly amendments) for the rehabilitation
and expansion of the City of Opa-Iocka's infrastructure. The five-year Capital Improvement Plan
identifies necessary capital projects totaling $17,790,700.00. The preparation of the Capital
Improvement Plan (CIP) involved preparing various engineering studies for roadway improvements,
resurfacing projects, drainage projects, landscaping, street lighting, environmental contamination
abatement, sanitary sewer collection and transmission, water distribution systems, parks and recreation
improvements, and demolition of unsafe structures. Included in this program was the identification of
funding sources, revenue projects, requirements for applicable grants, as well as other required
planning information.
. Replacement of ACP Water Mains along NW 13Sth Street and Opa-Iocka Blvd., Opa-Iocka,
Florida - This project replaced approximately 2 miles of old asbestos cement (ACP) force mains and
water mains in the City of Opa-locka, in connection with the widening and rehabilitation of the NW
l35th Street/ Opa-Iocka Boulevard corridor. Sizes of mains replaced varied from 8" to 16" diameter,
and the project also included a bridge attachment for a 12" water main aerial crossing over the Opa-
locka Canal.
. Water & Wastewater Extensions for Western Pembroke Pines, Florida (Individual Experience) -
Project Manager for the design development of the water distribution and wastewater collection system
for approximately 20 square miles of annexed lands in Western Pembroke Pines, Florida. This project
was completed at a cost exceeding $15.000,000.
EDUCA TION
Bachelor of Science
in Civil Engineering,
Florida
International
University, 1986
PROFESSIONAL
REG/STRA TION
Florida Professional
Engineer License No.
39435
Puerto Rico
Professional
Engineer License
11732
23
'-1
t-_gA~fEEl~
CARBAllO
, ] I!IH :'^o~"'~:
DANIEL J. GRANDAL, P.E.. CFM. LEED AP
Project Manager
r 1
EXPERIENCE
Mr. Grandal has over 16 years experience in design and construction of civil engineering and site development
projects. He has served as a project manager and project engineer for various drainage, water and sewer projects.
He was a plan reviewer for Miami-Dade DERM. He has a broad understanding of permitting requirements of
Miami-Dade County Depmiment of Public Works (DPW), Department of Environmental Resources Management
(DERM), SFWMD, and FDEP. His drainage experience has included Environmental Resource Permitting (ERP),
multi-basin floodplan analysis, cut and fill analysis and wetland mitigation. He is proficient at vm;ous software
packages including ICPR, MBR (SFWMD Multi-Basin Routing Software), Flowmaster, AutoCAD, AutoTurn
and EaglePoint. Some of his experience includes:
rl
I
.
Pinecrest Watermain Master Plan and System Design, Pinecrest, Florida - Project Manager for the
design of over 27 miles of watermain to complete the potable water system of the entire Village. The Master
Plan was prepared that included a computerized model of the entire system and public workshops and
meetings were held to inform and educate the residents of the work and cost involved in the project. C3TS
also prepared special taxing districts and an EQCB Variance to detail the finances of this $23 million project.
. 1
J
r 1
.
Belle Meade Drainage Improvements, Miami, Florida - Project Manager of this $8 million project which
consisted of the design and pennitting of a drainage and streetscape improvement project encompassing
several miles of road in a developed flood-prone neighborhood providing quality treatment through the use of
exfiltration trenches and storm water treatment units and discharging through a large stormwater pump station
to the Little River Canal. Permitting included pre/post computer modeling and stage calculation for Miami-
Dade's Class 11 Surface Water Management Permit.
. 1
'"
Grove Park Drainage and Roadway Improvements, Miami, Florida - Project Manager to provide
engineering design services necessary for drainage and roadway improvements for the Grove Park area in the
City of Miami. The Grove Park area is an existing residential neighborhood encompassing Y2 square mile
which was identified as flood-prone area. General Development Report was prepared to evaluate the existing
road and drainage conditions, develop alternative improvements and cost estimates, and to recommend a
preferred alternative on comprehensive roadway analysis, drainage analysis, public involvement, and research
of existing right-of-way, and flood complaints. The roadway analysis included evaluation of milling and
resurfacing requirements, damaged sidewalk and/or curb and gutter replacement, ADA pedestrian ramp
requirements, and landscaping.
.
. ,
. ,
L ,
. Plantation Midtown Drainage Study, Plantation, Florida - Project Manager responsible for this study to
analyze the drainage system of a 760-acre area known as Plantation Midtown, a mixed use area with
Residential, Commercial and Institutional Zoning. The purpose of the study was to provide a backbone
drainage system that would allow future development and redevelopment in accordance with the Master
Plan. The existing system was modeled using ICPR with information from available records and survey of
the existing drainage system. Future development was also modeled in accordance to the maximum
development potential of the area. The study recommends drainage improvements that would allow the
future development and creates an integrated system to be easily maintained by the City. These
recommendations were coordinated into current Roadway/ Landscaping Improvements Projects and future
CIP projects in order to minimize construction in the area.
. North Miami Floodplain Management Plan, North Miami, Florida - Project Manager of preparation of a
Floodplain Management Plan for the City of North Miami. The report provides a detailed assessment of the
city's drainage system and helps identify and prioritize the city's floodplain needs in order to minimize future
flood losses in the community. As documented in Floodplain Management Plan, C3TS was instrumental in
the planning process which included public outreach programs, education programs, public meetings and
forums, drainage system analysis, including mapping of flood prone areas based on complaint records and
field inspections and drainage improvement and maintenance programs. The city's NFID Program was
extremely successful and was able to capitalize on 15% discount for North Miami's residents flood insurance
offered by the National Flood Insurance Program (NFIP).
. Miami Lakes NW 82nd Avenue Drainage Improvements, Miami, Florida - Project Manager for the
design of approximately 1 mile of arterial (section line) roadway on NW 82 Avenue from NW l54th Street to
NW l70th Street. Drainage design included inter-connected exfiltration trench with positive outfall to the
canal system and beautification improvements including asphalt overlay, repair of curbs and sidewalks,
striping, signage, and landscaping and irrigation. Drainage in some areas was minimized in order to protect
the existing landscaping. The scope included utility coordination, maintenance of traffic, construction
support services and permitting through DERM and Miami-Dade Public Works.
EDUCATION
Bachelor of
Science In
Civil Engineering,
Tulane University.
1993
Minor in
Environmental
Engineering
PROFESSIONAL
REGISTRATION
Florida Professional
Engineering License
No, 53850
LEED Accredited
Professional
24
~ 1
__COR ZO
_CASTELLA
CARBAL LO
rnTl THOMPSON
lUCJ SAL MAN
RAMON CASTELLA P.E., LEED AP
Division Director
~ 1
EXPERIENCE
Mr. Castella has over 26 years of expertise in Civil Engineering Projects throughout Florida and in the Caribbean.
Mr. Castella's Land Development experience includes such projects as Embassy Lakes subdivision, which
consisted of a 640-acre residential community and land planning for over 3,000 acres in South and Central
Florida. He also has extensive experience with Municipal engineering projects, including the programming,
planning, and preparation of construction documents as well as construction administration. Projects range from
the development of park facilities and expansion of Municipal buildings to sizable public works projects. His
public works projects include drainage, flood control, coastal construction, water and sewer expansions, road and
bridge construction, municipal land planning and grant acquisition. Mr. Castella has extensive experience with
the design and quality assurance of major roadway projects. Some of his relevant work experience includes:
'1
r I
.
Village of Key Biscayne Redevelopment of Gravity Drainage Wells, Key Biscayne, Florida - Senior
Project Engineer in charge of this project, which involved the cleaning, rehabilitation, and redevelopment of
30 existing gravity drainage wells located throughout the Village. Responsibilities included inspections,
management, and conducting testing at each well to ensure expected discharge capacity was achieved. The
work was funded by a grant from the South Florida Water Management District.
, 1
i ' I ·
I . 1
I
Town of Golden Beach Capital Improvements Program, Golden Beach, Florida - Senior Project
Engineer for this comprehensive Capital Improvements Program Master Plan that focuses on several major
improvement areas: town-wide drainage improvements; utilities underground relocation (electrical, telephone,
cable); town-wide streetscape & traffic calming; and renovation to the Town's existing Town Hall building.
The Master Plan carefully considered the each of these with respect to feasibility, cost/benefit, and design, as
well as an analysis of funding options and scenarios, and schedule for phasing and implementation.
j <"-1
I ·
Village of Pinecrest Watermain Master Plan and System Design, Pinecrest, Florida - Senior Project
Engineer for this design project that included the design of over 12 miles of watermain to complete the potable
water system of the entire Village. The Master Plan was prepared that included a computerized model of the
entire system and public workshops and meetings were held to inform and educate the residents of the
extensive work and cost involved in the project. C3TS also prepared special taxing districts to better explain
the finances of the project. The two phases of construction provided potable water to over 550 propel1ies
previously connected to individual private wells. This successful project also included the implementation of a
system during construction to allow each homeowner to select the best location for their new water meter.
. ,
I
l. J
r I
I
. J
'I ·
Palmetto Bay Villagewide Neighborhood Drainage Improvements, Palmetto Bay, Florida - Senior
Project Engineer of the field surveying, design, permitting, bidding, and construction administration of
drainage improvements at 10 locations throughout the Village. These 10 areas were identified by the Village
as having flooding problems. The improvements included new drainage structures, exfiltration trenches,
outfalls, and asphalt overlays. The project was completed on schedule and under budget.
. North Miami Floodplain Management Plan, North Miami, Florida - Senior Project Engineer responsible
for the preparation of a Floodplain Management Plan for the City of North Miami. The rep0l1 provides a
detailed assessment of the city's drainage system and helps identify and prioritize the city's floodplain needs
. I in order to minimize future flood losses in the community. As documented in Floodplain Management Plan,
C3TS was instrumental in the planning process which included public outreach programs, education
programs, public meetings and forums, drainage system analysis, including mapping of flood prone areas
based on complaint records and field inspections and drainage improvement and maintenance programs. The
city's NFlD Program was extremely successful and was able to capitalize on 15% discount for N0l1h Miami's
residents flood insurance offered by the National Flood Insurance Program (NFIP).
'. Crandon Boulevard Master Plan, Key Biscayne, Florida - Senior Project Engineer of the design for this
project that takes an existing suburban style highway and transforms it into a center of cOlmnunity activities.
By promoting the safe and secure transit of all types of vehicles and pedestrians, this Crime Prevention
Through Environmental Design (CPTED) friendly design also serves to create a source of identity for the
cOlmnunity connecting retail, residential, public parks and government facilities into a cohesive design. The
project consisted of a master plan that encompassed the design for a 4-lane divided road, improved public
safety, casing of traffic congestion, traffic calming, pedestrianization, improved mass transit, streetscape
improvements, sidewalks, lighting, and a roundabout. This project, divided into three phases, will provide
the Village with a reference for the traffic and public safety impacts of future development or redevelopment
of propel1ies fronting Crandon Boulevard and its side streets.
EDUCATION
Bachelor of
Science in Civil
Engineering,
Florida
Imernational
University, 1985
PROFESSIONAL
REGISTRA TION
Florida
Professional
Engineer License
No. 40073
Puerto Rico
Professional
Engineer License
No. 11731
LEED Accredited
Professional
25
'1
__CORZO
_CASTELLA
CARBALLO
rxm THOMPSON
l.Tll:.ISAlMAN
DIANA SUDASASSI-BILBAO. P.E.
Traffic Calming
'1
EXPERIENCE
r 1
Mrs. Sudasassi-Bilbao, with over 14 years of experience, has been Project Engineer, Project Manager, and
Engineer of Record on many traffic calming and roadway projects, and is responsible for the design and production
of several municipal roadway improvement projects undertaken by the firm. She is experienced in developing
residential, commercial and highway lighting and roadway plans. This experience includes implementation of
traffic calming devices such as roundabouts and diverter islands, resurfacing and reconstruction plans, drainage
design studies and reports, maintenance of traffic, signalization, lighting and signing and marking plans. She has a
good drainage and lighting background with many of the local regulatory agencies. Some of her project experience
includes:
r 1
r 1
. Town of Golden Beach Capital Improvements, Golden Beach, Florida - Traffic Calming Engineer for this
comprehensive Capital Improvements Program Master Plan which focuses on several major improvement
areas: town-wide drainage improvements; utilities underground relocation (electrical, telephone, cable); town-
wide streetscape & traffic calming; and renovation to the Town's existing Town Hall building. The Master
Plan carefully considered the each of these with respect to feasibility, cost/benefit, and design, as well as an
analysis of funding options and scenarios, and schedule for phasing and implementation.
. Pinecrest Water main Master Plan and System Design, Pinecrest, Florida - Civil Engineer for this project
which included the design of over 27 miles of watermain to complete the potable water system of the entire
Village. The Master Plan was prepared that included a computerized model of the entire system and public
workshops and meetings were held to inform and educate the residents of the extensive work and cost involved
in the project. C3TS also prepared special taxing districts to better explain the finances of the project.
. Crandon Boulevard Master Plan, Key Biscayne, Florida - Traffic Calming Engineer for this project that
takes an existing suburban style highway and transforms it into a center of community activities. By
promoting the safe and secure transit of all types of vehicles and pedestrians, this CPTED-friendly design also
serves to create a source of identity for the community connecting retail, residential, public parks and
government facilities into a cohesive design. The project consisted of a master plan that encompassed the
design for a 4-lane divided road, improved public safety, easing of traffic congestion, traffic calming,
pedestrianization, improved mass transit, streetscape improvements, sidewalks, lighting, and a roundabout.
This project, divided into three phases, will provide the Village with a reference for the traffic and public
safety impacts of future development or redevelopment of properties fronting Crandon Boulevard and its side
streets.
'I
, ,
I 1
I
'1
. J
, J
I ,
. Plantation Midtown Improvements and Greenway Transit Route (Phase I & II), Plantation, Florida -
Senior Civil Engineer for streetscape design that will include the reconstruction of 2.5 miles of mixed use
walkways, textured crosswalks, parallel parking, landscaped medians, and a roundabout at a key intersection of
the City. As the first phase of a large project, C3TS' design will be the template for all improvements to
follow in the City's midtown area. As part of the City's master plan, a greenway transit route for the entire
midtown area is included. We have worked with the City in designing the route that the first phase of the bus
transit will operate as well as helped them research the different type of transit vehicles available to them. In
working hand in hand with the City on this issue, we are ensuring that the design we deliver meets the needs
and expectations for the entire scope of their greenway project.
. San Amaro Drive Traffic Calming Improvements, Coral Gables, Florida - Traffic Calming Engineer /
Project Manager for the construction of San Amaro Drive and Campo Sano Avenue along the west and north
boundaries of the University of Miami was a collaborative effort between the City of Coral Gables and the
University. The project's primary goal was to slow down traffic along this 0.7 mile peripheral collector
roadway, and provide pedestrian safety improvements. A series of traffic calming measures were employed,
including lane narrowing, diverters, medians, landscaping, and a roundabout. A continuous sidewalk along the
entire project length was constructed tying into the surrounding sidewalks in the neighborhood by way of
decorative concrete crosswalks and corner sidewalk extensions.
. South Miami Downtown Improvement Project, Phase I, South Miami, Florida - Senior Civil Engineer for
the design, permitting, and construction of drainage and watermain improvements within the downtown South
Miami area on SW 73rd Street, SW 58th Avenue, and SW 58th C01ll1. Improvements included a 12"
watermain extension and new drainage systems. Responsibilities during construction included coordination
with local merchants to minimize impact of construction on their business.
. Yumuri Street, Monza Avenue & Venera Avenue Improvements, Coral Gables, Florida - Project
Engineer for the development of roadway plans including drainage, utility coordination and pavement
markings. Coordination of permitting requirements on behalf of the client. Responsible for transmittals, shop
drawing reviews, preliminary cost estimates and construction plan clarifications.
EDUCA TION
Bachelor of
Science in Civil
Engineering,
Florida
International
University, I994
PROFESSIONAL
REGISTRATION
Florida
Professional
Engineer License
No. 56926
26
rl
__COR ZO
_CASTELLA
CARBAllO
= THOMPSON
~SALMAN
CARLOS M. HERDOCIA, P.E.
Signalization / Signing &
Pavement Marking
r 1
EXPERIENCE
Mr. Herdocia has over 20 years of experience and has been Project Manager, Senior Design Engineer, and
Engineer of Record on various roadway projects for several municipalities in Miami-Dade, Broward, and
Palm Beach Counties. Some of these projects include:
. SW 2641h Street Improvements (US-l to SW 13ih Avenue), Miami-Dade County, Florida - Project
Manager and Senior Project Engineer (Engineer of Record) involved with the design for the proposed
street improvements for SW 264lh Street (approx. 0.74 miles). Design elements included a new
configuration for SW 2641h Street with a two lane divided roadway within an 80 foot right of way. The
proposed con-idol' design consisted of standard travel lanes, bicycle lanes, parking stalls with landscape
bump-outs after every second parking stall, a landscaped median, traffic separator, standard curb and
gutter, sidewalk, school bus drop-off, pavement marking and signage, roadway lighting and report,
school zone with applicable markings, signs and flashers, and modification of existing traffic signal at
US-I. Design elements of stormwater management included over 3,150 feet of exfiltration trench, 2,000
feet of solid pipe, 45 drainage structures, pollution control structure with an emergency overflow into
Naranja Canal with a rip-rap end-wall and manatee grate. Services also included preliminary field
investigations, utility coordination, computation book, drainage report, detailed cost estimates and
permitting through DERM.
. West Kendall District Park (SW lsih Avenue and SW 120"' Street), Miami-Dade County, Florida
- Project Manager and Senior Project Engineer (Engineer of Record) involved with proposed new
roadway design and street improvements for Miami-Dade County. Design elements included over 4,600
feet of exfiltration trench, 1,000 feet of solid pipe, 31 drainage structures, over 5,000 feet of 16" water
main with sub-aqueous crossing, roadway resurfacing, roadway lighting and report, new signalization
with mast arm configuration of existing intersection, over 1 mile of new roadway with sub base, base and
asphalt, sidewalk, guardrail, landscaped median, retaining wall, curb and gutter, pavement markings and
signs and coordination with structural department for design of proposed Bridge over a canal. Services
include the production of Grading and Drainage, Typical Sections, detail plans, preliminary field
investigations, utility coordination, computation book, drainage report and detailed cost estimates. Other
tasks included permitting through DERM, Miami-Dade Water and Sewer, Miami-Dade Fire Rescue,
Florida Depaliment of Health and acquisition of Right of Way permit through SFWMD.
r )
'1
, 1
I I
, 1
. ,
, ,
. Hialeah Street Improvements, Hialeah, Florida - Project Manager and Senior Roadway Engineer
(Engineer of Record) for the engineering design and preparation of construction drawings and
specifications for numerous roadway reconstruction projects in the City of Hialeah varying from 0.5 to
1.5 miles, and two- to five-lane sections. The improvements included geometry, earthwork, pavement
sidewalk, curb and gutter, raised median, drainage, lighting, pavement marking and signage. Some of the
projects include:
West 44'h PI. from West 10th Ave. to West 12'h Ave.
West 26th St. from West 52nd Ave. West 60th Ave.
West 33rd St. from Palm Ave. to East 4th Ave.
West 37'h St. from West of 16th Ave. to West 8'h Ave.
West 46'h St. from West 16'h Ave. to West 12th Ave.
West 56th St. from West 26'h Ave. to West 20'h Ave.
West 18th Ave. from Okeechobee Rd, to West 49th Ave.
- East 8th Ct. from East 45'h St. to East 49th St.
- East 8'h Lane from East 45'h St. to East 49th St.
- East 9th Ct. from East 45th St. to East 491h St.
- East 9'h Lane from East 45'h St. to East 49'h St.
- East 4yth St. from East 8'h Ave, to East lO'h Ave.
- East 2nd Ave. from East 33rd St. to West41" St.
- East 2211(1 St. to East 241h St. & East 9'h Ave.
. NW nnd Avenue from Okeechobee Road to NW 122nd Avenue, Miami, Florida - Project Manager
and Senior Project Engineer (Engineer of Record) responsible for design of 2.5 miles of roadway.
Project includes widening from two lane to four lane divided as well as installing new drainage on
existing four-lane section of the corridor. Also included are the reconstruction of sidewalks, curb and
gutters, upgrading 11 signalized intersections to mast arm configuration, and the installation of lighting.
. SW 6th Street Improvements, Sweetwater, Florida - Project Engineer on the design of approximately
0.5 miles of urban road resurfacing, sidewalk rehabilitation, drainage improvements, pavement marking
and signage, and landscaping plans. Responsibilities included Construction Administration and
Inspections.
. NE Innd Street Improvements, North Miami Beach, Florida - Project Manager and Senior Roadway
Engineer (Engineer of Record) on 0.8 mile roadway widening and resurfacing project including
pavement widening, overlay, curb and gutter, curbed islands, landscaping, drainage, on-street parking,
lighting, pavement marking and signage.
EDUCATION
Bachelor of
Science in Civil
Engineering,
Florida
International
University, 1988
PROFESSIONAL
REGISTRATION
Florida
Professional
Engineer License
No.: 47660
27
, 1
__COR ZO
_CASTELLA
CARBALLO
= THOMPSON
UJ..CjSALMAN
RICHARD BLANCO, P.E.
Streetscape Design / Civil Engineer
'1
EXPERIENCE
Mr. Blanco has over 17 years of experience in Civil Engineering, with project experience in drainage design, bridge
hydraulics, wastewater collection and transmission, drainage works, land development, parks, street improvements, and
industrial facilities. He has served as project engineer and project manager for governmental and commercial clients on
a wide variety of project assignments. He has extensive experience in sitework engineering for industrial and
commercial facilities, including design of drainage, wastewater collection and treatment, and enviromnental permitting.
. Town of Golden Beach Capital Improvements, Golden Beach, Florida - Project Engineer for this
comprehensive Capital Improvements Program Master Plan which focuses on several major improvement areas:
town-wide drainage improvements; utilities underground relocation (electrical, telephone, cable); town-wide
streetscape & traffic calming; and renovation to the Town's existing Town Hall building. The Master Plan carefully
considered the each of these with respect to feasibility, cost/benefit, and design, as well as an analysis of funding
options and scenarios, and schedule for phasing and implementation.
. Sunset Drive Improvements (West of US-I), South Miami, Florida - Senior Project Engineer for this master
planning project involving the development of conceptual streetscape and infrastructure improvements along
Sunset Drive from the western city limits to US-I. These include delineating intersections with concrete pavers and
crosswalks, redefining roadways sections, and providing new lighting and landscape design to increase public
safety and appeal. In addition, a new architectural site plan for City Hall was designed incorporating surrounding
public spaces and facilities to create an enhanced civic and community space. The master plan was developed
substantially in accordance with the City's Hometown Plan Area 2, and evaluated proposed improvements with
respect to their feasibility, cost/benefit, design, and construction. In addition, C3TS held three public workshops to
collect public opinions and suggestions, and ensured the Master Plan was sensitive to the community.
Crandon Boulevard Master Plan, Key Biscayne, Florida - Senior Project Engineer of design for this project
that takes an existing suburban style highway and transforms it into a center of community activities. By
promoting the safe and secure transit of all types of vehicles and pedestrians, this CPTED-friendly design also
serves to create a source of identity for the community connecting retail, residential, public parks and govermnent
facilities into a cohesive design. The project consisted of a master plan that encompassed the design for a 4-lane
divided road, improved public safety, easing of traffic congestion, traffic calming, pedestrianization, improved
mass transit, streetscape improvements, sidewalks, lighting, and a roundabout.
r 1
, 1
, 1
, 1
I
J
~ 1
.
-l
Plantation Midtown North Streetscape & Roadway Improvements, Plantation, Florida - Senior Project
Engineer for streetscape design that will include the reconstruction of2.5 miles of mixed use walkways, textured
crosswalks, parallel parking, landscaped medians, and a roundabout at a key intersection of the City. As the first
phase of a large project, C3TS' design will be the template for all improvements to follow in the City's midtown
area. As part of the City's master plan, a greenway transit route for the entire midtown area is included. We have
worked with the City in designing the route that the first phase of the bus transit will operate as well as helped them
research the different type of transit vehicles available to them. In working hand in hand with the City on this issue,
we are ensuring that the design we deliver meets the needs and expectations for the entire scope oftheir greenway
project.
Phases IA & IB Water Main Extension / SW n"d to SW 801h Street and from SW 6ih Avenue
to SW 70lh A venue, City of South Miami, Florida - Project Engineer for this project which consisted of the
installation of approximately 2,640 lineal feet of8" D.LP. water main with associated fire hydrants, water meters,
valves, fittings, pavement restoration and I" pavement overlay throughout a residential conununity within the city
limits of South Miami. Although most of the project took place within residential streets, there was a need to tap
into an existing water main along a highly traveled road. This project site was visited at least twice a week and
sometimes even twice on one particular day. In addition to observing the on-going work, digital pictures were taken
at almost every visit to record the project progress.
. Indian Creek Village Improvements, Indian Creek, Florida - Project Engineer for this project in which C3TS
and Rosenberg Gardner Design (RDG) developed a Master Plan for the Village oflndian Creek through a series of
public presentations and workshops with the Village Council and residents. Based on the Master Plan, C3TS and
RDG have completed the Preliminary Design of the proposed improvements. These improvements include
reconfiguration of the Village entrance by tightening the corner radii, expanding the landscaped corners on either
side, creating an oval landscaped island, and historically restoring of the existing Gate House. The main roadway
into the Village will also be reconfigured by narrowing the travel lanes to l2-feet, introducing of a center
landscaped median, and a 5 ft. wide sidewalk for pedestrian and traffic safety. The main thoroughfare through the
Village will be reconfigured to introduce several safety improvements including: narrowing the road to inhibit
speeding, creating an 8-ft pathwav for pedestrians and bicvclists. and providing lighting along the pathwav.
.
.
EDUCATION
Master of Fine Arts
in Creative Writing
Florida
International
University, 1997
Bachelors of Science
in Civil Engineering
Florida
International
University, 1991
PROFESSIONAL
REG/STRA TlON
Florida
Professional
Engineer
License
No. 53135
28
rl
t- COR Z 0
CASTELLA
_ CARBALLO
r.t:m THOMPSON
=SALMAN
ERNESTO A. FABREGAS, P.E., CFM
Chief Drainage Engineer
~l
EXPERIENCE
rl
Mr. Fabregas has over 35 years of experience in the design and construction of large-scale civil engineering
and transportation projects. His background in construction has included several design build projects giving
him an exceptional background. In addition he has been heavily involved in the area of drainage design for
transportation projects. He has an in-depth knowledge of permitting requirements under SFWMD and
SJRWMD permit criteria and has utilizing various software packages as AdICPR, Pond Pack, Flow Master,
Culvert Master, WSPRO, HEC-22, TR-55, FDOT Optional Culveli Estimator and has developed various
Hydraulic Design Mathcad and Excel spread sheet programs. Some relevant projects include:
. Districtwide Drainage Design Services, FDOT District 4 - Senior Project Engineer responsible for
providing analysis, design selvices to FDOT District 4's In-House Drainage Team. C3TS functions as a
direct extension of District 4's staff on these projects. Under this contract the following drainage studies
and projects have been performed: SR 714 Ma11in Downs Blvd. Flood Study; SR AlA Tidal Flooding
Remediation at Hollywood Beach; SR AlA at the Moorings in Indian River County (Flooding Study); SR
5 at PGA Blvd. in Palm Beach County (Flood Study and Design Exfiltration Trenches); SR 70 in S1. Lucie
County (Design of 3 miles of 4-lane divided rural arterial drainage system); SR 80 and Entrada Acres
Flooding Study; and NE 24th Street and SR 5 Flooding Study.
. Project Development and Environment (PD&E) Study for the widening of SR 710 PD&E from CR
609 in Martin County (District 4) to SR 70 in Okeechobee County (District 1), FDOT District 4 -
Senior Drainage Engineer for the study of this 25 mile corridor (alternatives are being developed for the
15 mile segment from CR 609 to thc Okeechobee/Mal1in County line under this study). This study is one
of six PD&E Studies being conducted by FDOT for the SR 710 cOlTidor in Palm Beach and Ma11in
County. The purpose of this study is to relieve future congestion by providing additional capacity and
transit modes along the existing SR 710 corridor. As part this study, C3TS will provide support to the
prime consultant in geometries and development of alternatives and lead the study in conducting the
District's new Pond Siting procedures. This project contains an interceptor ditch within the RlW that
constitutes part of the regional drainage system, which collects and conveys runoff under SR 710 from
more than 26,000 acres of offsite properties. The proposed stormwater management system incorporates
protection for nearby wetlands while providing the required stormwater treatment and attenuation.
. 95 Express Lanes (from South of SR 112 to North of SR 826), Miami-Dade County, Florida, FDOT
District 6 - Senior Drainage Engineer for this project which includes re-striping 1-95 and modifying
shoulders to provide two II-foot Express Lanes and four II-foot regular travel lanes in each direction;
installing electronic Open Road Tolling (ORT) equipment similar to that already in use along SR 836 and
the Florida Turnpike; implementing Intelligent Transp0l1ation System (ITS)-related equipment including
electronic message signs and ramp signals; widening several bridges along 1-95 in the vicinity ofSR 112
and modifying existing on and off ramps between 1-95 and SR 112 to accommodate the new Express
Lanes; modifying storm water drainage; and converting the NW 10th Avenue on ramp to northbound 1-95
to a dedicated Express Lane.
1-95 SB from NW 125'h Street to NW 135t11 Street, Miami-Dade County, Florida FDOT District 6 -
Senior Project Engineer for the capacity improvements to 1-95 SB from NW 1251h Street to North of the
Opa- Locka Blvd. Interchange. The project includes addition of a general-purpose lane through the project
limits and an exclusive auxiliary lane between NW 125th S1. and the NW 1351h S1. on-ramp. The project
also includes the widening of three bridges with modified AASHTO beans, widening adjacent to existing
MSE wall systems, analysis of French drain systems adjacent to MSE walls and concrete pavement
design.
1-95 Southbound Widening from Opa-locka Blvd. to NW 125'h Street, Miami-Dade County, FDOT
District 6 - Senior Project Engineer for the drainage design of the capacity improvements to 1-95
Southbound from NW 1251h S1. to NW 1351h S1. The objective of the project is to provide capacity
improvements to 1-95 by adding an additional general purpose lane within the project limits as well as an
auxiliary lane between the NW 1251h S1. Off-Ramp and the NW 1351h S1. On-Ramp. Some of the
challenges to be overcome for this project include the widening of three bridges (NW 131$1 S1., NW 135111
S1. and Opa-Locka Blvd.), and the alteration/modification of existing MSE Walls to accommodate the
proposed widening. The drainage system consists of exfiltration trenches with controlled positive outfall.
f 1
I
r ,
I 1
J
. f
I
I
~ 1
, I
, ,
i
, I
.
.
I. .
. Florida Department of Transportation Drainage Handbook - Exfiltration Systems, Central Office -
Senior Project Engineer for the development of the FDOT's Standard Drainage Handbook. Addresses the
design of exfiltration trenches and injection wells to be utilized or a statewide basis.
EDUCA nON
B.S. Civil
Engineering
(Validation),
University of
Miami,1997
MS. Organization
& Management of
Construction,
Moscow
Management
Institute, Republic
of Russia, 1980
B.S. Civil
Engineering
Structures and
Roadways,
Universidad de
Oriente, Cuba,
1975
PROFESSIONAL
REGISTRATION &
CERTIFICATIONS
Florida
Professional
Engineer License
No. 53841
Certified Floodplain
Manager
SFWMD ERP
Training
FDOT
Specijications
Package
Preparation
Training
FDOT
PPMTraining
FDOT Advanced
Work Zone Trajfic
Control Certification
AASHTO Roadside
Design Guide
Training
FES Storm water
Management Design
Course
SFWMD SHGWT
Training
AdlCPR Training
29
r1
__COR ZO
_CASTELLA
CARBAllO
= THOMPSON
~SAlMAN
DA VE E. CLARKE, P.E.
Drainage & Permitting
r 1
EXPERIENCE
Mr. Clarke has over nine years of experience on various roadway projects for several municipalities in Miami-
Dade County. His experience also includes the inspection, construction, and coordination of utilities for major
projects, including urban arterials, limited access facilities, and design/build projects for FOOT. Some of his
experience includes:
. SR 862 (1-595) west of 1361h Street to east of the Turnpike, Design Build P3, Broward County, FOOT
District 4 - Project Engineer for the proposed P3 improvements of an approximate 10-mile section of SR
862 (1-595) west of 136111 Street to east of the Turnpike. The project includes the coordination of conflict
resolution with a total of 18 VAO facilities in the area of the project. Responsible for the design and
development of Utility Adjustment Plans and cost estimates for relocation work. Responsible for producing
plans specification and cost estimates for the relocation of facilities owned by the City of Sunrise and the
Town of Davie, and for coordinating reimbursable agreements with all UAO facilities in the area of the
project.
. SW 2641h Street Improvements (US-I to SW 1371h Avenue), Miami-Dade County, Florida - Project
Engineer involved with the design for the proposed street improvements for SW 264 Street (approx. 0.74
miles). Design elements included a new configuration for SW 264 Street with a two lane divided roadway
within an 80 foot right of way. The proposed corridor design consisted of standard travel lanes, bicycle
lanes; parking stalls with landscape bump-outs after every second parking stall, a landscaped median, traffic
separator, standard curb and gutter, sidewalk, school bus drop-off, pavement marking and signage, roadway
lighting and report, school zone with applicable markings, signs and flashers, and modification of existing
traffic signal at US-I. Design elements of storm water management included over 3,150 feet of exfiltration
trench, 2,000 feet of solid pipe, 45 drainage structures, pollution control structure with an emergency
overflow into Naranja Canal with a rip-rap end-wall and manatee grate. Duties also included preliminary
field investigations, utility coordination, computation book, drainage repOli, detailed cost estimates and
permitting through DERM.
. West Kendall District Park, Miami, Florida - Project Engineer involved with proposed new roadway
design and street improvements. Design elements included over 4,600 of exfiltration trench, 1,000 feet of
solid pipe, 31 drainage structures, over 5,000 feet of water main, roadway resurfacing, signalization of
existing intersection, over 1 mile of new roadway with sub base, base and asphalt, sidewalk, guardrail, curb
and gutter and stripping and coordination with structural department for design of proposed Bridge over a
canal. Also responsible for the production of Grading and Drainage, Typical Sections and Detail plans.
Duties also included preliminary field investigations, utility coordination, permitting through DERM and
drainage report and detailed cost estimates.
. South Miami Downtown Improvements Phase IV, South Miami, Florida - Project Engineer involved
with street and drainage improvements. Design elements included over 200 feet of exfiltration trench, 200
feet of solid pipe, ten drainage structures, milling and resurfacing of roadway, side walk, curb and gutter
stripping & signing landscaping and irrigation and maintenance of traffic (MOT) plans. Also responsible
for the production of demolition, geometry paving grading and drainage, typical sections and detail,
landscaping and irrigation plans. Duties also included drainage report and detailed cost estimates.
. Street Improvements from East 22 Street to East 24 Street & East 9 Avenue, Hialeah, Florida -
Project Engineer involved in design and preparation of construction drawings and specifications for the
roadway reconstruction to this two-lane residential section with parking in accordance with the current city
policies; including roadway pavement, curb and gutter, sidewalk, earthwork, drainage, street lighting,
pavement marking, and signing.
. Hialeah Street Improvements Phase II, Hialeah, Florida - Project Engineer responsible for drainage and
street improvements. Design elements included over 5,500 feet of exfiltration trench, 1,000 feet of solid
pipe, sixty six drainage structures, new road base and sub base, side walk, curb and gutter and pavement
markings. Duties also included preliminary field investigations, permitting through DERM, drainage report
and detailed cost estimates.
r1
r 1
I
r J
r ,
J
: I
. ,
~ 1
. 1
, J
, J
. MDCPS State School "WWW", Hialeah, Florida - Project Engineer involved with site plan development
for new a new school. Design elements included over 2,000 feet of ex filtration trench, 1,000 feet of solid
pipe, 30 drainage structures, propose water and sewer tap and laterals, new parking lot base and sub base,
street resurfacing, curb and gutter and stripping. Also responsible for the production of Demolition,
Geometry Paving Grading and Drainage, Typical Sections and Detail plans. Duties also included
preliminary field investigations, utility coordination, permitting through DERM and Florida Depaliment of
Environmental Protection (FDEP).
EDUCATION
Masters in Civil
Engineering,
Florida
International
University, 2008
Bachelor of
Science in Civil
Engineering,
Florida
International
University, 2002
PROFESSIONAL
REGISTRA TION
Florida Professional
Engineer License
No. 66553
30
r1
'1
r 1
r I
, 1
I
r 1
J
r 1
. j
, 1
! 1
l I
. \
. J
( I
. .
__COR Z 0
_CASTEllA
CARBALLO
~ THOMPSON
U1l:JSALMAN
TOMAS RUIZ, P.E., CFM, LEED AP
GIS / Drainage Engineer
EXPERIENCE
Mr. Ruiz has over eight years experience in design and construction of civil engineering and site
development projects. He has served as a project engineer for various drainage, water and sewer projects.
His drainage experience includes Environmental Resource Permitting (ERP), multi-basin floodplain
analysis, and cut and fill analysis. He is proficient at various software packages including MBR (SFWMD
Multi-Basin Routing Software), AdICPR (Advance Interconnected Pond Routing), Flowmaster, AutoCAD,
AutoTurn and EaglePoint. Some of his project experience includes:
. GIS Development for Pavement and Sidewalk Assessment in the Town of Cutler Bay
(2008-2009) - GIS and database programmer responsible for the development and analysis of GIS data
as part of the Town's pavement and sidewalk assessment. This project consisted of collecting field data,
analyzing data, developing GIS layers, and providing recommendations to the Town. A relational
database, using MS Access, was developed to digitally store field data in real-time as technicians
collected it. Arcview GIS was used to analyze field data and determine zones based on pavement
condition. These zones were used to update the Town's capital improvement plan. GIS layers
developed for this study were later used to prepare a submittal of projects eligible for Federal Stimulus
Funds.
. Oakes Road Planning Level Analysis Study, Davie, Florida - Engineer responsible for the
development of a feasibility study to evaluate extending Oakes Road over Florida's Turnpike and
connecting it to Davie Road. The purpose of this feasibility study is to document the Purpose and Need
for the extension of the corridor. This will form the basis for further study during a Project Development
& Environment (PD&E) phase of the corridor. The study corridor follows Oakes Road from Davie Road
to State Road 7 and is approximately 1.72 miles long. During the study, existing planning studies and
comprehensive plans were evaluated, coordination was held with regional agencies (Broward MPO,
FOOT District Four and Florida's Turnpike) and a conceptual roadway geometry was developed to
determine the potential roadway footprint and required bridge crossing.
. 1-595 Express Design Build Finance Operate Maintain (DBFOM) from 1-75 to West of 1-95 in
Broward County, Florida, FDOT District 4 (Ongoing) - Project Engineer for this $1.22 Billion
(Construction) Public Private Partnership (P3) Infrastructure project covering 10.5 Miles of
improvements along 1-595 including the total reconstruction of the interstate and the implementation of
three reversible tolled express lanes. Utility Project Engineer for the development of lP A Horizontal
Directional Drilling projects beneath 1-595 for the installation of communication fiber optic facilities for
Comcast and Fibernet.
. Town of Medley Water-Loss Database (2004) - Database progranm1er. This project consisted of
developing a relational MS Access database to streamline daily operations and monthly reports generated
by the Public Works Department. Specific emphasis was placed on the ease with which the database
accepts information and generates reports. The database consists of five modules, which require the user
to simply input parameters and all calculations are performed and stored internally by the database. All
reports are available through user-friendly interfaces which require the user to select the desired report
from a drop-down box and click on a print button.
. Districtwide PD&E Consultant - PL&EM Library (GIS, Database & Maintenance), FDOT
District 4 - Project Manager for this Task Work Order, assisting the District with maintenance of their
Planning and Environmental Management Office Electronic Library and development of a Data Entry
Interface to work with their existing database. Includes coordination with GIS personnel for exporting
database contents, scanning and cataloging library contents and maintaining their physical library as
well. In-house personnel provided for weekly maintenance and coordination.
. SW 10th Street Corridor Feasibility Study from the Sawgrass Expressway to I 95 in Broward
County, FDOT District 4 - Drainage Engineer for the development of a corridor feasibility study
evaluating potential transportation improvements for a 3 mile corridor connecting two limited access
facilities. Concepts considered include I) No Build; 2) TSM; 3) At-grade expansion to a six-lane
arterial; and 4) Six-lane controlled access arterial with urban interchanges (SPUI's) at Military Trail and
Powerline Road, and frontage roads; 5) Four-lane express roadway with urban interchanges (SPUI's) at
Military Trail and Powerline Road and frontage roads; 6) Transit alternative with a six-lane divided
facility with a two-lane, two-way dedicated busway in the center. Improvements to the Sawgrass
Expressway interchange with Florida's Turnpike were also evaluated.
EDUCATION
Bachelor of Science in
Civil Engineering,
Florida International
University, 2004
Associate of Arts
Degree in Pre-
Engineering, Miami
Dade College, FL,
2001
Associate of Science
Degree in Electronics
Technology, Cochise
Community College,
AZ, 1999
PROFESSIONAL
REGISTRA TION
Florida Professional
Engineer License
No. 69213,
2009
Certified Floodplain
Manager
LEED Accredited
Professional
31
rl
__COR '0
_CASTELLA
CARBALLO
= THOMPSON
UWSAlMAN
RODRIGO O. RODRIGUEZ, P.E., CCS
Senior Project Engineer
r 1
EXPERIENCE
Mr. Rodriguez has over 30 years of professional responsibility in infrastructure planning, design, construction, and
operation for an array of capital projects in civil, sanitmy, and environmental engineering fields; for municipal and
other public agencies and for private industry. Mr. Rodriguez has served as consultant and City Engineer to a number
of municipalities as well as having experience as Director of the Public Utilities Depmtment serving a population of
160,000 with potable water and wastewater utilities, including as 16 MGD water treatment plant. He was the lead
project manager for the closure of the NW 581h Street landfill in Miami-Dade County, a 360-acre Superfund site,
which included final cap and stormwater management and creation of freshwater wetlands. Mr. Rodriguez's
experience covers a wide range of services including water, wastewater, and stonnwater utilities, utility rate
structures, capital improvement, and emergency response planning. His expertise also covers the area of coastal and
saltwater wetlands. He was project manager on the restoration of the mangrove wetlands in the Oleta River Basin,
which covered 7 acres requiring regrading and replanting. He has designed other salt water and fresh water wetlands,
including sub-aquatic grasses and littoral zones to form part of migration areas. Specific project experience includes:
Highlands Village Neighborhood Improvements, City of North Miami Beach, Florida - Senior Civil
Engineer for a $6 million dollar neighborhood improvement project in a low lying area of the City of North
Miami Beach with extensive flooding and water quality problems resulting from failed onsite septic
systems. The project included design of a pumped deep well disposal system, design of a wastewater
collection and transmission system, including a new pump station and force main, design of roadway and
site improvements, preparation of construction plans, permitting and preparation of grant applications
seeking financial assistance to complete the project.
South Miami Watermain Extension - Phase IA & IB, City of South Miami, Florida - Senior Engineer
for this project which consisted of the installation of approximately 2,640 lineal feet of 8" D.1.P. water main
with associated fire hydrants, water meters, valves, fittings, pavement restoration and 1" pavement overlay
throughout a residential community within the city limits of South Miami. Although most of the project
took place within residential streets, there was a need to tap into an existing water main along a highly
traveled road.
r 1
r 1
r 1
r J .
I 1
. I
.
. J
· 1
I
. !
, I
.
I
, J
,
j
I
. ,
, I .
NW 16th Street Water Main and Sewer Force Main, Lauderhill, Florida - Senior Engineer for this
project which included 3,100 L.F. of 16" DIP; 400 L.F. of 16" HOPE Pipe (HDD under US-441); and 800
L.F. of 12" DIP. The main purpose of this wastewater transmission main project is to provide wastewater
service to new development in the east portion of the City; in particular to the new Central Broward
Regional Park, new developments such as Georgetown, and to provide pump station flow relief. A large
16" diameter HD polyethylene pipe crossing under US-441 was required.
Monticello Service Area Sewer System, North Miami Beach, Florida - Senior Engineer for the planning
of the Monticello Pump Station included the tributary of commercial properties along N.E. 163rd Street and
single/ multi-family neighborhoods within the service area of the Monticello District. The first phase of
construction consisted of installing gravity sewers to the commercial sector; disconnecting existing septic
tanks, and working with the individual property owners to properly locate the service laterals. The pump
station is sized to accommodate a future extension of the sewers to the residential areas.
. MCC Pump Station and Force Main - Project Manager for this Project which consisted of renovations
and upgrades to a wastewater lift station that was "piggy-backing" into another pump station, which in turn
exhibited more than 10 hour/day in operation. The project consisted of constructing a Y2 mile long force
main and upgrading the pump station to permit manifolding into existing transmission main, thereby
allowing both stations to operate well within the 10 hour day maximum. The design included a casing
crossing of a railroad spur and sequencing of the work to allow full-time by-passing of the flows and
providing uninterrupted flows.
. Medley Booster Pump Station, Town of Medley, Florida - Project Manager for this pump station project
which included the site selection, hydraulic analysis, preliminary design report, final design, construction
documents, construction administration, pump testing and start-up services. This project was awarded an
Engineering Excellence Honorable Mention award from the Florida Institute of Consulting Engineers
(FICE). The Medley Booster Pump Station is a project whose implementation provided an innovative, cost-
effective solution to chronic problem in the area.
. Freshwater Wetlands Enhancement; 58th Street Landfill, Miami-Dade County - Project Manager in
the design of closure of a 360-acre landfill on EP A's priorities list. Design offorty-acre freshwater wetland,
including eradication of exotic vegetation, providing for stormwater retention of the site. Design of
remedial actions, site grading, stormwater management, littoral and sedimentation areas, perimeter dikes,
overflows and underdrain system. Wetlands' perimeter was approximately 8,000 feet long.
EDUCATION
Bachelor of Science
in Civil Engineering,
University of Miami,
1973
PROFESSIONAL
REGISTRATION
Florida Professional
Engineer
PROFESSIONAL
AND CIVIC
AFFILIATIONS
National Society of
Professional
Engineers (NSPE)
Florida Engineering
Society (FES)
American Society
of Civil Engineers
(ASCE)
American Water
Works Association
(A WWA)
AWARDS
Recipient of the
Outstanding Service
to the Engineering
Profession Award,
Florida Engineering
Society, Miami
Chapter, 2002
Recipient of the
Second Place Award
for Chapter
Excellence as
President of the
Miami Chapter of
the Florida
Engineering Society,
2001
Recipient of the
Consulting Engineer
of the Year Award,
American Institute of
Architects, Miami
Chapter, 2001
32
r1
r 1
, 1
r 1
, J
I
r 1
I
I
. \
, \
-l
. ,
__COR ZO
_CASTELLA
CARBAllO
rrm THOMPSON
L..I:J.I:JSALMAN
SEAN COMPEL, P.E., LEED AP
Senior Construction Administrator
EXPERIENCE
Mr. Compel has over 9 years of experience in the construction of civil engineering and site development
projects. He has served as project construction administrator and project engineer for various drainage,
water, sewer, underground electrical, and industrial projects. His experience in construction service has
allowed him to effectively deliver projects satisfying all owner requirements. Responsibilities during
construction include permitting, review of scheduling, and overall cost analysis. He is proficient at various
software packages including Microsoft Project, MBR (SFWMD Multi-Basin Routing Software),
Flowmaster, AutoCAD, AutoTUI11 and EaglePoint. Some of his project experience includes:
. Village of Key Biscayne Redevelopment of Gravity Drainage Wells, Key Biscayne, Florida - This
project involved the cleaning, rehabilitation, and redevelopment of 30 existing gravity drainage wells
located throughout the Village. Responsibilities included inspections, management, and conducting
testing at each well to ensure expected discharge capacity was achieved. The work was funded by a grant
from the South Florida Water Management District.
. NW 82nd Avenue Improvements, Doral, Florida - Project Manager and Construction Administrator
for this project which included the study, design, and construction administration of various
improvements on NW 82nd A venue from NW 12th Street to NW 25th Street. It consisted of milling and
resurfacing, sidewalk and curb and gutter replacement and reconstruction, handicap ramp replacement,
and drainage work including the installation of exfiltration trenches, concrete manholes and solid pipes.
The project also involved the repair of damaged asphalt around existing manholes, valves, and above
existing drainage trenches and crossings. The final design also included pavement markings and signage.
. VilIagewide Drainage Improvements, Palmetto Bay, Florida - Construction Administrator for this
project which involved drainage improvements at 10 locations throughout the Village of Palmetto Bay.
These 10 areas were identified by the Village as having flooding problems. The improvements included
new drainage structures, exfiltration trenches, outfalls, and asphalt overlays. The project was completed
on schedule and under budget.
. South Miami Downtown Improvements, South Miami, Florida - Construction Administrator and
Project Designer for these improvements within the South Miami Downtown area. The improvements
consisted of the design, permitting, and construction of streetscape improvements including watermain
extensions, new French drains, new wide pedestrian friendly sidewalks, irrigation, lighting, and
landscaping. These updated systems were vital to allow the downtown area to develop and expand.
Responsibilities during construction included coordination with local merchants to minimize impact of
construction on their business.
. Village of Key Biscayne Zones 1 & 4 Water Main and Sanitary Sewer Replacement, Key Biscayne,
Florida - Construction Manager responsible for the construction administration for this project that
includes the construction of sanitary sewers, manholes, existing pump station upgrades and modifications,
lateral connections, fire hydrants, water main replacement including valves and appUlienances, and
roadway/right-of-way restoration, and other related work as shown on the plans.
. Village of Key Biscayne Zones 2 & 3 Reclaimed Water & Line Replacement Sanitary Sewer, Key
Biscayne, Florida - Director of Construction Services responsible for the construction administration for
this project that includes the construction of sanitary sewers, manholes, existing pump station upgrades
and modifications, lateral connections, fire hydrants, water main replacement including valves and
appurtenances, and roadway/right-of-way restoration, and other related work as shown on the plans. In
addition to observing the on-going work, digital pictures were taken at almost every visit to record the
project progress.
. Pinecrest Watermain Master Plan and System Design, Pinecrest, Florida - Project Manager and
Construction Administrator for the installation of over 12 miles of watermain infrastructure throughout
the Village. This two phase project provided potable water to over 550 properties previously connected to
individual private wells. This successful project also included the implementation of a system to allow
each homeowner to select the best location for their new water meter.
. Golden Beach Capital Improvements Program, Golden Beach, Florida - Construction Administrator
for this comprehensive Capital Improvements Program Master Plan that focuses on several major
improvement areas: town-wide drainage improvements; utilities underground relocation (electrical,
telephone, cable); and town-wide streetscape & traffic calming. The Master Plan carefully considered
each of these with respect to feasibility, costlbenefit, and design, as well as an analysis of funding options
and scenarios, and schedule for phasing and implementation.
EDUCATION
Bachelor of Science in
Civil Engineering,
University of Miami.
2002
PROFESSIONAL
REGISTRATION
Florida Professional
Engineering License
No. 66618
LEED Accredited
Professional
33
r J
__CORZO
.CASTELLA
CARBALLO
= THOMPSON
~SALMAN
DANILO CAICEDO, E.t.
Senior Inspector
r 1
EXPERIENCE
Mr. Caicedo has over 31 years of experience in all phases of construction and inspections. During this time he has
built multi-million dollar projects from initial to final phase, commercial developments to custom single family
housing, has carried out daily on-site inspections and supervision, maintaining excellent conununication skills and
safety standards. He has acquired building permits and supervised project construction as well as review of plans and
specifications. Some of his project experience includes:
. North West South River Drive Relocation, Medley, Florida - Senior Inspector for this project in which C3TS
provided engineering design and construction administration of improvements to North West South River Drive,
(from NW 127 Street to NW 122 Street) as part of the area redevelopment effOlt. This project comprises
Northwest South River Drive Relocation and Stormwater Improvements - Phase I and consists of the construction
of approximately 1,500 linear feet of municipal roadway (2-lane) construction, including associated stormwater
system improvements and coordination with the proposed Medley Linear Park project. This phase included the
relocation of the road (demolition and new construction), the supply and installation of storm pipes, exfiltration
trenches, catch basins, manholes and all appurtenances associated with the drainage system. Also including the
use, inspection, cleaning and connection with the existing drainage system, construction of swales, concrete curb
and gutters and valley gutters, driveway approaches, concrete sidewalk, landscaping which includes sodding and
restoration of existing plants and trees, removal and disposal off-site excavation materials. The construction
inspection services included on site personnel to provide overseeing, coordinating, and inspecting the work of
surveyors and construction contractors. Responsibilities included monitoring, record keeping, approving and
recommending requisitions for compensation, review of change orders, estimations, claims, scheduling, shop
drawings and remedial designs. C3TS also provided responses to Requests for Information (RFI) and assuring
compliance with all local, state and federal regulations, on behalf of the Town of Medley. By performing regular
field observations, effective conununication was established between the Construction Administrators, Engineers,
Contractor, and Owner.
, 1
r 1
r 1
r f
I 1
, I
, 1
I
t
. ,
. Sunset Drive Improvements (West of US-I), South Miami, Florida - Senior Inspector for this master planning
project involving the development of conceptual streetscape and infrastructure improvements along Sunset Drive
from the western city limits to US-I. These include delineating intersections with concrete pavers and crosswalks,
redefining roadways sections, and providing new lighting and landscape design to increase public safety and
appeal. The master plan was developed substantially in accordance with the City's Hometown Plan Area 2, and
evaluated proposed improvements with respect to their feasibility, cost/benefit, design, and construction. In
addition, C3TS held three public workshops to collect public opinions and suggestions, and ensured the Master
Plan was reflective of, and sensitive to the community.
. Palmetto Bay ViIlagewide Drainage Improvements, Palmetto Bay, Florida - Senior Inspector for this project
that involved field surveying, design, permitting, bidding, and construction administration of drainage
improvements at 10 locations throughout the Village. These 10 areas were identified by the Village as having
flooding problems. The improvements included new drainage structures, exfiltration trenches, outfalls, and asphalt
overlays. The project was completed on schedule and under budget.
. Belle Meade Drainage Improvements, Miami, Florida - Senior Inspector of the civil portion of this $8 million
project which consisted of the design and permitting of a drainage and streetscape improvement project
encompassing several miles of road in a developed flood-prone neighborhood providing quality treatment through
the use of exfiltration trenches and storm water treatment units and discharging through a large stormwater pump
station to the Little River Canal. Permitting included pre/post computer modeling and stage calculation for Miami-
Dade's Class II Surface Water Management Permit.
. Pinecrest Watermain Master Plan and System Design, Pinecrest, Florida - Senior Inspector for the design of
over 27 miles of watermain to complete the potable water system of the entire Village. The Master Plan was
prepared that included a computerized model of the entire system and public workshops and meetings were held to
inform and educate the residents of the work and cost involved in the project. C3TS also prepared special taxing
districts and an EQCB Variance to detail the finances of this $23 million project.
. Highland Village Neighborhood Improvements, North Miami, Florida - Senior Inspector responsible for the
construction inspection services consist of on-site personnel to provide the construction engineering administration
services including but not limited to overseeing, coordinating and inspecting the work of surveyors and
construction contractors. Responsibilities include monitoring, record keeping, approving and reconunending
requisitions for compensation, review of change orders, estimations, claims, scheduling, shop drawings and
remedial designs. C3TS also provides responses to Requests for Information (RFI) and assuring compliance with
all local, state and federal regulations, on behalf of the City of North Miami Beach.
EDUCA nON
Master of Civil
Engineering
Norwich
University,
Vermont, 2009
Bachelor of
Science in
Engineering
Florida
International
University, 1990
REGISTRA TIONS
Engineer Intern
1100009198
34
rl t._gA~TRE~l~
CARBAllO
lID] ~H;~~S~~
'1
EXPERIENCE
rl Ms. Beltre has over 18 years of experience and has been Project Manager, Engineer of Record and Senior
Project Engineer on several Project Development and Environmental (PD&E) Studies, Transp0l1ation
Planning Studies, as well as highway and bridge final design projects. She has also pm1icipated in numerous
trainings and certifications including her most recent coursework in Urban Transportation Planning which
r 1 included: travel demand forecasting, trip generation, trip distribution, transit planning, mode split, traffic
assignment and land use issues. She has also been involved in and has experienced with the design of
signing and marking, lighting, and signalization. Some of these projects have included:
r I .
1
Golden Glades Interchange PD&E Study (SR 826 EB to 1-95 NB), Miami-Dade County, Florida,
FDOT District 6 - QA I QC Officer for the development of this two stage PD&E Study. The Golden
Glades Interchange is of regional importance providing connectivity to six major principal m1erials
andlor limited access expressway facilities including 1-95/SR 9A, SR 9, SR 9 I (Florida's Turnpike), US-
441/SR 7 and SR 826 (The Palmetto Expressway). The first stage is to evaluate a new direct connect
ramp from Eastbound SR 826 to Northbound 1-95 as well as various operational improvements to the
various interchange internal ramp systems (Including development of an IMR). The second Stage is to
develop a Master Plan that incorporates these improvements in addition to the development of a direct
connect elevated managed lanes connection to and from SR 826 to and from the north connecting to the
1-95 elevated flyover express lanes.
· t
.1
f I
. Miami Lakes CRA Program, Miami Lakes, Florida - Public Information Specialist in charge of CRS
J Program Update in 2010 to correspond with Cycle Visit to be held in October- 2010. The Town's goal
through this process is to improve to Class 4 community receiving a 25% Flood Discount. A complete
review of the current CRS Program was conducted to establish the current status of the program was
performed. C3TS is currently working on creating brochures, assisting the Town with Outreach events
and preparing mailers to attain maximum credit. C3TS is also assisting the Town with all
documentation required for their cycle visit.
F 1
. I
. ; . Oakes Road Planning Level Analysis Study, Davie, Florida - QC Manager for the development of a
feasibility study to evaluate extending Oakes Road over Florida's Turnpike and connecting it to Davie
Road. The objective of this feasibility study is to document the Purpose and Need for the extension of the
corridor. This Purpose and Need will be used to solicit the Broward County Metropolitan Planning
Organization (MPO) for the inclusion of the project in the 2035 Long Range Transportation Plan (LRTP)
and subsequent Project Development and Environment (PD&E) study phase. This will form the basis for
fUl1her study during the PD&E phase. The connection would provide a vital link to the east and central
portions of the Regional Activity Center (RAC), designated by the Town as part of their redevelopment.
In addition, the Oaks Road extension would benefit redevelopment of the State Road 7 conidor.
. 1
. ..
. ,
. N.W. South River Drive Feasibility Study, Medley, Florida - Project Manager and Engineer of
Record for the development of a planning study for the widening of NW South River Drive from 107th
Avenue to the Palmetto Expressway. This project which is being funded by an MPO grant includes
various typical section alternatives, coordination for traffic analysis and corridor analysis, preparation of
a land use analysis study and the development of a public involvement program. The public involvement
program includes the development of a Business Advisory Council (BAC) and the establishment of
several workshops to address the needs of this corridor.
. Trafficways Improvement Study, Medley, Florida - Senior Engineer for the planning and analysis of
the Town of Medley's major roadways for needed improvements. The Town is unique in that it serves as
the industrial center for Miami-Dade County and as such contributes to the region's economy. The
industrial nature of the traffic (heavy tractor-trailers) impacts the Town's roadway system and ability to
move goods and services in the area. Several roadway corridors were reviewed and recommendations for
future improvements were made resulting in additional studies of specific roadway corridors.
. SW 10th Street Corridor Feasibility Study from the Saw grass Expressway to I 95, Broward
County, FDOT District 4 - Project Manager and Engineer of Record for the development of a major
corridor feasibility study evaluating potential transp0l1ation improvements for a 3 mile corridor
connecting two limited access facilities. Concepts considered include I) No Build; 2) TSM; 3) At-grade
expansion to a six-lane arterial; 4) Six-lane controlled access arterial with urban interchanges (SPUI's)
at Military Trail and Powerline Road, and frontage roads; 5) Four-lane express roadway with urban
interchanges (SPUI's) at Military Trail and Powerline Road and frontage roads; and 6) Transit alternative
with a six-lane divided facility with a two-lane, two-way dedicated busway in the center. Additionally,
improvements to the Sawgrass Expressway interchange with Florida's Turnpike were also evaluated.
SIL VIA M. BELTRE, P.E.
Senior Project Engineer
EDUCATION
Bachelor of Science in
Civil Engineering - Cum
Laude, University of
Miami. 1992
Bachelor of Science in
Architectural Engineering -
Cum Laude, University of
Miami, 1992
PROFESSIONAL
REGISTRATION
Florida Professional
Engineer No. 51295
ETDM Training
Public
Involvement & Socio-
cultural Effects
Evaluation
Training
FlCE / FDOT LRFD
Seminar Training
FDOT Traffic Engineering
FDOT Project Management
Training
FDOT Public Involvement
On-Line Training (selected
by District Five for program
testing)
FDOT Environmental
Management Training
PD&E Process
Overview Training, 2009
FDOT Advanced Work
Zone Traffic Control
Cert!lication
35
~l
__COR ZO
_CASTELLA
CARBALLO
rrrn THOMPSON
=SAlMAN
GODFREY A.a. LAMPTEY, P.E., PTOE
Traffic Engineer
rl
EXPERIENCE
Mr. Lamptey has been actively involved in research and the practice of transportation engineering for over nine
years. He has considerable experience, particularly, in the areas of traffic operations and signalization studies,
transportation planning and highway design, He is proficient in the use of several traffic engineering and
signalization software such as HCS+, CORSIM, TRANSYT-7F, SYNCHRO, SIMTRAFFIC, PASSER II,
VISSIM, ARTPLAN and HIGHPLAN. He has been the Lead Traffic Engineer on several Traffic Operations
and Signalization Studies, Transportation Planning and Project Development and Environment Studies as well
as Highway Design projects. Some of his relevant experience in traffic operations and signal timing includes:
. NW South River Drive Expansion Area Master Plan (MPO Study), Medley, Florida - Traffic
Engineer for the development of a Master Plan addressing traffic circulation and access for a 4,265 acre
industrial area within the Town of Medley. Responsibilities included: Coordination of traffic data
collection for 72 hour ADT counts and 8 hour turning movement counts, trip generation and traffic
forecast analysis using the Miami Urban Area Transportation Model (MUA TS), capacity and safety
analysis of signalized intersections and arterials, development of optimal signal timings and arterial
coordination parameters (such as cycle length, actuated and effective green time, clearance time and
offset) using SYNCHO and SIMTRAFFIC for the intersections at NW 138th Street, NW 107th Avenue
and NW 121st Way with US-27/0keechobee Road.
. SR 934/ J.F. Kennedy/79th Street Causeway Access Modification Study - City of North Bay Village,
Miami Dade County, Florida - Lead Traffic Engineer for the traffic operations study from just west of
Adventure Avenue (MP 1.843) to East Treasure Drive (MP 2.408) to address operational issues and access
needs of the corridor. Responsibilities included: Capacity analysis to evaluate the adequacy of the
operational characteristics along the corridor, evaluation of existing signal timings, development of
optimal signal timing parameters and determination of optimal left turn storage requirements to obtain an
acceptable Level of Service (LOS) for four signalized intersections using HCS+, SYNCHRO and
SIMTRAFFIC. Other responsibilities included safety review and development of an access management
plan for the corridor.
. Traffic Impact Study for Ernest Graham Elementary School, Hialeah, Florida - Lead Traffic
Engineer for traffic evaluation of a proposed new bus drop-off facility to alleviate the chronic traffic
congestion around Ernest R. Graham Elementary School during the critical mOl11ing drop-off and
aftel1100n pick-up periods. Responsibilities included: Collection of traffic data such as turning movement
counts, traffic forecast analysis including trip generation and traffic assignment, parking accumulation
studies for both passenger cars and buses, evaluation of existing signal timings and development of
optimal signal timings parameters (such as cycle length, actuated and effective green time, clearance time
and phasing sequence) for two signalized intersections within the study area using HCS+, SYNCHRO and
SIMTRAFFIC and recommendations to mitigate the acute congestion during the peak hours.
. SR 5 / US 1 Overseas Highway Resurfacing Restoration and Rehabilitation Scoping Study Monroe
County, Florida, FDOT District 6 - Traffic Engineer for the 2.7 mile segment of US-I / Overseas
Highway scoping study extending from MP 23.133 (MM 97) to MP 25.772 (MM 99.7). Responsibilities
included: Comprehensive review of the corridor's physical conditions and evaluation of safety and traffic
operational conditions along the project corridor to identify any deficiencies and recommendations to
improve the substandard features.
. SR-934/ NW/NE 79th Street Resurfacing Restoration and Rehabilitation Scoping Study Miami-Dade
County, Florida, FDOT District 6 - Traffic Engineer for the 3 mile segment of SR-934/ NW/NE 79th
Street extending from NW 13th Court to Biscayne Bay/ NE Bayshore Drive. The goal of this project is to
preserve the existing pavement resources and enhance operations and safety along this important corridor
that serves as the main leg of the SR-934 six-lane unbalanced one-way pair. Responsibilities included:
Comprehensive review of the corridor's physical conditions, an evaluation of safety and traffic operational
conditions along the project using ARTPLAN to identify operational and safety deficiencies, evaluation of
existing signal timings and development of optimal signal timings parameters (such as cycle length,
actuated and effective green time, clearance time) for 13 signalized intersections within the study area
using HCS+ and SYNCHRO.
. Districtwide Traffic Operations and Safety Studies, FOOT District 4 - Traffic Engineer for the
development of traffic operational strategies to enhance safety, while minimizing impact to traffic flow at
various intersections within the district. Responsibilities included: Development of engineering
countermeasures to reduce the number of crashes and/or the severity of the crash pattel11s identified, traffic
operational analysis, preparation of preliminary estimate of construction costs and benefit- cost analysis.
'1
< 1
f
,
r 1
f 1
I
,
, 1
~ 1
, I
. ,
I ,
EDUCATION
Masters in Civil
Engineering, Purdue
University, West
Lafayette, IN 2004
Bachelor of Science
in Civil Engineering,
University of Science
& Technology,
KlImasi, Ghana 2001
PROFESSIONAL
REGISTRATION
Florida Professional
Engineer No. 68261
CERTIFICA TlONS
Bentley 2004
GEOPAK User
Training
Conference, Ft.
Lauderdale
PUBLICATIONS
Lamptey G., Labi S. and
Sinha K. C.
Investigating the
Sensitivity of Optimal
Safety Needs to Key
Safety Management
Inputs, Presented at 84
Annual Tramportation
Research Board
Meeting, Washington
DC (2005)
Lamptey G., Labi S.,
and Sinha K. C, A
Proposed Framework
for Safety Investment
Planning in Indiana,
Presented at 83rd
Annual Transportation
Research Board
Meeting. Washington,
D. C (2004)
Lamptey G., Labi S. and
Sinha K. C,
Development of
Analytical and Software
Toolsfor Safety
Management in Indiana,
Project Report prepared
for the Joilll
Tramportation
Research Program
(JTRP), Purdue
University, West
Lafayelle, IN. (2004)
36
'1
'1
I
'1
1
I
, J
I
1
I
, ,
__COR ZO
_CASTELLA
CARBALLO
r:I'Tf.] THOMPSON
WI:JSALMAN
EXPERIENCE
Mr. Jacques has been working in the civil engineering field for ten years. He was with the FDOT traffic
safety program and has been a C3TS Transportation Planner and Drainage Designer on several projects
and planning studies for the FDOT and various municipalities statewide. In addition he was the Budget
Director and Chief Officer of the Port-au-Prince Bureau for the Haitian Ministry of Agriculture. He was
responsible for overseeing the North-West Development Organization which governed the development
and regional Urban Planning for the NOI1h-West region of Haiti. Some of his transportation project
experience includes the following:
. Project Development & Environment (PD&E) Study for the Widening of SR 80 / Southern
Boulevard from Seminole Pratt-Whitney Road to Forest Hill Boulevard, FDOT District 4
(private developer funded) - Project Engineer for the study of this four-mile corridor to include
widening from 4- to 6-lanes and upgrading to SIS, FIHS, and Access Management Standards. This
corridor is one of two major east-west corridors within northern Palm Beach County. The project will
include compliance with the District's Pond Siting Procedure for drainage considerations, and is being
developed as a State Environmental Impact Report (SEIR).
. SR 934 / NE 82nd Street Traffic Calming and Milling & Resurfacing within Shorecrest
Community, Miami-Dade County, FDOT District 6 - Project Manager and Engineer of Record
(EOR) for the traffic calming and milling & resurfacing of approximately one mile of SR 934. Project
includes the construction of traffic chokers / bulbouts on both sides of roadway in order to alleviate
speeding issues along this corridor. Project also entails correcting horizontal deficiencies such as
superelevations, and milling & resurfacing the roadway in order to extend the life of the pavement.
. SW 10 Street Corridor Feasibility Study from the Sawgrass Expressway to I 95 in Broward
County, FDOT District 4 - Project Engineer for the development of a corridor feasibility study
evaluating potential transportation improvements for a 3 mile corridor connecting two limited access
facilities. Concepts considered include 1) No Build; 2) TSM; 3) At-grade expansion to a six-lane
arterial; and 4) Six-lane controlled access arterial with urban interchanges (SPUl's or TDUl's) at
Military Trail and Powerline Road, and frontage roads. Improvements to the Sawgrass Expressway
interchange with Florida's Turnpike will also be evaluated.
. SR 934 (NW/NE 79, 81 and 82 Streets) Project Development & Environment Study (PD&E) from
NW 13 Court to Biscayne Bay, Miami, FDOT District 6- Project Engineer for this study involved
the study of a 3-mile six lane one-way pair system in a highly urbanized section of Miami-Dade
County. The study includes consideration for conversion of the existing one-way pair to two
independent bi-directional facilities. The Department's Livable ConilllUnities Initiative, extensive
Traffic Analysis Program and development of alternatives to comply with tight R/W restrictions are
major factors in this study. This study includes execution of a complex Public Involvement Program
with the establishment of a CAC/BAC for this Environmental Assessment (EA). Close coordination
with the City of Miami Transportation and Planning Division is critical since the potential corridor
improvements are deemed as the catalyst for economic stimulus and corridor redevelopment. Also
provided Creole translations for Public Involvement process, written documents and interpretation of
public meetings.
. Port of Palm Beach Corridor Study, Riviera Beach, FDOT District 4 - Project Engineer for the
development of a corridor study addressing various alternatives for improved access to the pOl1. This
required the investigation of six alternative corridors considering the construction of a grade separation
over the FEC rail line which runs the length of the pOl1. The Preferred Corridor was then evaluated for
several overpass and tunnel alternatives (open tunnel). The selected corridor was in the area ofFP&L's
existing eight 138kv high voltage transmission lines and future 230kv lines. Close coordination with
various entities (City of Riviera Beach, City of West Palm Beach, FEC, FP&L, port businesses, etc.)
was critical to this project. This project is seen as a necessary catalyst for continued growth of the POI1
which will positively impact the regional economy. This study also involved the first Socio-Cultural
Effects (SCE) Evaluation performed for District 4.
. SR-5 / US-l Overseas Highway from south end of Tavernier Creek Bridge to north of Jo Jean
Way Monroe County, Florida, FDOT District 6 - QC Reviewer for the milling and resurfacing
project for US-l Overseas Highway from south end of Tavernier Creek Bridge to nOl1h of Jo Jean Way.
Responsibilities included review of traffic operations and safety analysis, pedestrian signal warrant
analysis, roadway and maintenance of traffic plans.
DESIR JACQUES, P.E.
Project Engineer
EDUCATION
Master of Science in
Civil Engineering,
Florida International
University, 2005
Bachelor of Science
in Civil Engineering,
Florida International
UniversiZy, 1998
Bachelor of Science
in Economics
Haitian State
University of
Economy, 1991
PROFESSIONAL
REGISTRATION
Florida Professional
Engineer No. 62453
Georgia Professional
Engineer No.
PE031556
Geopak Level I &II
Training
AASHTO Roadside
Design Training
Ad/CPR Training
PD&E Process
Overview Training,
2009
LANGUAGES
Fluent in English,
French, Creole
and Spanish
37
1
. _CORZO
. CASTELLA
_ CARBAllO
rrm THOMPSON
LI..l.fJSAlMAN
JEFFRY H. MARCUS, Ph.D.
Senior Environmental Scientist
I
I
EXPERIENCE
Dr. Marcus has over 35 years of experience in environmental assessment and regulatory compliance. He
has an extensive background in transportation related impact analysis as required by NEPA and FHW A
regulations. His areas of expertise include freshwater and marine ecology, wetlands restoration and
enhancement programs, and the preparation of environmental assessments and impact statements;
particularly in subtropical and tropical habitats. Dr. Marcus has conducted numerous biological surveys,
air and noise investigations, endangered species impact assessments, wetlands delineations, ecological risk
assessments, and has prepared a wide variety of permit applications at the Federal, state and local levels.
He has conducted over 200 Phase I and Phase II environmental audits and has supervised groundwater and
sediment contamination assessments throughout the United States. His compliance experience includes
RCRA, CERCLA, CW A, TSCA, FIFRA, OSHA, NEP A, and DOT. He is published on the impacts of oil
and dispersants on mangroves, corals, and seagrasses.
1
I
, I
I
. US-l South Two-Lane Safety Project, Florida City to Key Largo (Mitigation and permitting) -
Senior Environmental Scientist for this project. Tasks included the monitoring and maintenance of four
upfront wetland mitigation sites; design and permitting for the concurrent wetland mitigation including a
large scale restoration plan at Boca Chica that is creating 100 acres of seagrass by establishing tidal
exchange in impounded salt ponds on the Naval Air Station propeliy; permitting; Design
Change/Construction Advertisement Reevaluation with Essential Fish Habitat Assessment and
Endangered Species Biological Assessment reports; seagrass surveys; and, NEP A and permit
compliance monitoring.
~ i
. Districtwide Environmental Data & Report Contract in FDOT District 6 - Dr. Marcus has been
Project Manager for this project in the role he has managed over 400 tasks order for FOOT Project
Managers including Barbara Culhane, Marjorie Bixby and Catherine Owen. The tasks have varied from
the development of the NEPA documents (AN's, CSER's, air & noise studies, wetland reports, re-
evaluations), to the development of presentations and videos (Return to Nature), to expert witness
testimony at the State and Federal level for the US-l South 2-Lane Safety Project. Dr. Marcus has a
solid understanding of the PD&E process, ETDM, Class of Action and has an excellent relationship with
regulators at Miami-Dade County DERM, SFWMD, FDEP, NOAA Fisheries, USFWS, and USACE.
Dr. Marcus has a solid understanding of FOOT needs and has proven to be a problem solver for the
Department for over 25 years. He has dedicated his professional career to meet the ever changing
environmental needs of 06.
. Card Sound Road Intersection Environmental Assessment, FDOT District 6, Monroe County,
Florida - Dr. Marcus was responsible for issues relating to wetlands, essential fish habitat, and
threatened/endangered species. Even though the project was closed, the WER, ESBA, and EFH reports
were completed. This was a unique project that required complex coordination with the Crocodile Lake
National Wildlife Refuge, South Florida Water Management District (wetlands), and the U.S. Fish &
Wildlife Service (Key Largo cotton mouse and woodrat). Dr. Marcus represented the Department at
many public and agency presentations. He prepared a White Paper that was widely distributed. He
worked with URS, Parsons, and directly for FOOT.
. Districtwide Environmental Services Contract, FDOT District 6 (1991-2010) - Principal
Environmental Specialist and Contract Manager operating as an extension of FOOT's Staff for the
review of numerous NEPA documents prepared by other consultants. These included Environmental
Impact Statements for US 1 South (18 mile stretch), Tamiami Trail, The Miami lntermodal Center
(MlC), and the East-West Corridor. This included assisting the department in the development of the
Design-Build Criteria Package and associated RFP for US I South.
. Districtwide Environmental Compliance Services Contract, FDOT District 6 (1999-2010) -
Principal Environmental Specialist and Contract Manager operating as an extension of FOOT's Staff for
the review of hydrology reports, water quality reports, storm water pollution prevention plans and permit
compliance documentation conducted by other consultants. Environmental oversight of FOOT
contractors also occurred throughout District 6 on almost every major constmction project including all
sections of SR 826 and US I South.
EDUCA TION
Bachelor Sciences
in Biological Sciences,
University of
Colorado,
1975
Ph.D., Aquatic
Biology, University of
Lancaster, England,
1978
PROFESSIONAL
REGISTRATION &
CERTlFICA TIONS
Southeast Florida
Institute of Criminal
Justice -
environmental
e/?forcement training.
University of Florida -
completion of course
on assessment of
groundwater
contamination
Quality Improvement
Program - Team
Leader / Facilitator
Training
State of Florida -
Management Training
E.flects of Highway
Development on
Wetlands - FHWA.
University of Miami -
Hazardous Waste
Management Under
RCRA
SAlC-ESTG Quality
Assurance Training
SAlC-Fixed Price
Project Management
Ejj/cient
Transportation
Decision Making
(ETDM) Process
38
'1
I
r 1
1
r 1
I
r 1
I
. J
, I
L ,
. I
__CORZO
_CASTElLA
CARBAllO
r:r;rn THOMPSON
UlI:JSAlMAN
NICOLE CARTER, MS
Senior Environmental Scientist
EXPERIENCE
Ms. Carter has over 12 years of professional environmental experience in Florida. Her areas of
expertise include the preparation of NEP A (Programmatic, Cat-EX Type II, EA/Fonsi and EIS's)
documentation and FHW A regulations as well as State Environmental Impact Reports (SEIR) for
non-federally funded facilities. Her experience includes envirOlilllental permit compliance, marine
biological surveys and natural resource assessment, specifically for transportation related projects.
Her PD&E work includes project management and oversight, quality control and the preparation of
environmental documents including advanced notifications, project reevaluations, and
environmental technical repOlts. Her experience also includes permitting, Phase I audits, water
quality monitoring, endangered species monitoring, and marine biological surveys. Some of her
experience includes:
. Project Development and Environment (PD&E) Study for SR 80/Southern Boulevard
from CR 880 to Forest Hill Boulevard, FDOT District 4 - Environmental Project Manager
for the Development of the supporting environmental documents and the corresponding
PDSR/Cat-Ex Type II for this PD&E Study.
. Project Development and Environment (PD&E) Study for Golden Glades Interchange
SR 826/Palmetto Expressway Eastbound to 1-95 Northbound, FDOT District 6 -
Environmental Project Manager for the Development of the supporting environmental
documents and the corresponding PDSR/Cat-Ex Type II for this PD&E Study.
. Project Development and Environment (PD&E) Study for 1-95 Managed Lanes from SR
112 to Broward County Line, FDOT District 6 - Senior Environmental Scientist for the
Development of the Design Change/Construction Advertisement Reevaluation.
. Project Development and Environment (PD&E) Study for 1-395 from 1-95 to Biscayne
Bay, FDOT District 6 - Senior Environmental Scientist for the Development of the
suppOlting environmental documents and the corresponding EIS for this PD&E Study.
. Project Development and Environment (PD&E) Study for 1-75 from SR 826 to the
Miami-Dade/Broward County Line, FDOT District 6 - Senior Environmental Scientist
assisting FOOT District 6 with the review and oversight of the supporting environmental
documents and the corresponding PDSR/Cat Ex-Type II for this PD&E Study.
. Project Development and Environment (PD&E) Study for SR 836 I Dolphin Expressway
from NW lih Avenue to 1-95, MDX/FDOT District 6 - Senior Environmental Scientist
assisting FOOT District 6 with the review and oversight of the suppOlting environmental
documents and the corresponding PDSR/Cat Ex-Type II for this PD&E Study.
. Project Development and Environment (PD&E) Study for the Widening of the
Homestead Extension of the Florida Turnpike (HEFT) from SR 836 to East of NW 5ih
Avenue, Turnpike Enterprise - Senior Environmental Scientist for the Development of the
support environmental documents and the corresponding SEIR for this PD&E Study.
. Districtwide Environmental Services Contract, FDOT, District 6 - Senior Environmental
Manager operating as an extension of FDOT's Staff for the review of numerous final design
plans, LAP project plans and permit applications. She also conducted the environmental
impact review and class of action determination for all Miami-Dade and Monroe County
ARRA LAP projects and over 50 scoping reports. She has completed the Design
Change/Construction Adveltisement Reevaluation for SR 826/Palmetto Expressway Section
and 5, NOlth Roosevelt Boulevard, 1-195, NW 5th Avenue and The Miami Intermodal Center
(MIC). She also assisted with the development of the Design-Build Criteria Package and
associated RFP for all segments of US I South, NW 25th Street Viaduct and the GGMTF.
EDUCATION
Masters of Science
Marine Biology
Nova Southeastern
University, 2009
Bachelor of Science
Marine Science and
Biology,
University of Miami, 1998
PROFESSIONAL
REGISTRATION &
CERTIFICA TlONS
EjJicient Transportation
Decision Making (ETDM)
Process
SCUBA Certification -
PAD1
Florida Department of
Environmental Protection
NPDES Certified
Inspector
39
~l
__CORZO
_CASTELLA
CARBALLO
rxm THOMPSON
LI.il.ISALMAN
RALPH ROSADO, AICP, CNU-A
Director of Urban Planning & Grants Services
'1
EXPERIENCE
Mr. Rosado directs the firm's urban planning and neighborhood revitalization efforts. This includes leading
numerous public involvement, conflict resolution, and visioning workshops to ensure that urban character,
local identity, historic preservation, pedestrians, traffic, utilities, and natural hazards are considered
throughout the planning process. He is currently completing a Doctorate in City Planning from the
University of Pennsylvania, and completed a Master of Public Policy & Urban and Regional Planning from
Princeton University. Mr. Rosado also has planned in the private sector, administering land purchases,
financing, design, permitting, construction, and sales of over 200 single-family, multi-family, retail, office,
and mixed-use units. Additionally, he has extensive experience in the research, preparation and
administration of private, local, state, and federal grants for infrastructure and capital improvement projects;
in that role he has assisted South Florida municipalities in obtaining over $26 million in funding, so that their
projects can - at least in part - pay for themselves. Prior to joining C3TS, Mr. Rosado worked for the City of
South Miami as the Assistant to the City Manager and was promoted to Director of the South Miami
Community Redevelopment Agency, where he managed the daily operations of a nonprofit agency
responsible for bringing economic, housing, and recreational development to a low-income redevelopment
area. His experience includes:
. Marina Place at Riviera Beach, Riviera Beach, Florida - Following an extensive multi-year public
involvement process, the City and CRA of Riviera Beach selected C3TS for master planning,
infrastructure design, and architectural services to redevelop and revitalize the public and private areas of
the City's south district area which includes a marina, a community center, a public park, three gateways,
vehicular and pedestrian circulation, a major arterial, and several adjacent mixed-use parcels. With this
inspired project, the City of Riviera Beach hopes to achieve its destiny of becoming the best waterfront
city in Florida! Mr. Rosado serves as Senior Urban Planner for the project, leading over a dozen public
workshops and community input meetings at different scales.
. John F. Kennedy Causeway Redevelopment, North Bay Village, Florida - Mr. Rosado serves as
Project Manager for the redevelopment of the John F. Kennedy Causeway, the City's commercial
corridor. In order to initiate the project, Mr. Rosado facilitated a visioning process and several public
workshops, so helping residents and business owners to select a new image and aesthetic ("Island Garden
Oasis") to guide the design of the improvements. The overall project consists of a new master plan for
the city, leading to a new landscape design, construction of street beautification improvements, and a
redevelopment program, including roadway, business district, and waterfront amenities. Additionally,
Mr. Rosado has secured supplemental grant funding for the project, to alleviate the City's cost burden.
. Miracle Mile Streetscape Redevelopment, Coral Gables, Florida - Mr. Rosado serves as Senior
Urban Planner of this project to transform the Coral Gables Downtown Area into a more competitive
local downtown. The project results from an extensive series of public meetings and a charrette with
local residents and business owners. Enhancements include wider sidewalks, public open space to attract
foot traffic, improved urban lighting, tree grates, benches, kiosks, signage, more attractive throughways
to garages, and upgraded drainage facilities. In creating a more vibrant atmosphere for locals, this
Streetscape Project will inherently serve to attract a larger share of Greater Miami's visitors, including
the economic impact they generate, to Downtown Coral Gables.
C3TS Director of Grants Services
. Research, secure, and administer over $26 million in federal, state, and county grants for the firm's
municipal clients, for transp0l1ation and capital improvements projects.
. Grants completed include Community Development Block Grants, Florida Recreational Development
Assistance Program Grants, Land & Water Conservation Fund Grants, Safe Neighborhood Parks Grants,
U.S. Environmental Protection Agency Wastewater Improvement Fund Grants, an Empowerment Zone
Designation, Disabled Permit Parking Fine Program Grants, Florida Communities Trust Program Grants,
Florida Inland Navigation Grants, State Revolving Loan Funds for Wastewater System Improvements,
and Community Services Block Grants.
Consultant - Urban & Regional Planning Workshop: Revitalizing Journal Square (Jersey City &
Princeton, New Jersey)
. Served as part of a seven-person Princeton University team that led public workshops and assessed the
demographic, cultural, economic, and transp0l1ation conditions of a 24-block area in the City of Jersey
City, NJ. Presented local officials, the Jersey City Economic Development Corporation, and community
stakeholders with a final report, a brochure and a PowerPoint presentation, detailing recommendations
for revitalization.
r I
I
I I
, I
, ,
EDUCATION
Doctoral Candidate in
City Planning (Fields:
~Dordable Housing
Policy, and Inner City
Revitalization
Strategies),
University of
Pennsylvania,
School of Design,
Philadelphia, PA
Graduation
date: 2012
Master in Public
~ffairs (Field:
Domestic Policy) &
Urban and Regional
Planning,
Princeton University
Woodrow Wilson
School of Public &
International Affairs,
Princeton, NJ,
2004
Master of Arts in
English. Florida
International
University, 2003
Bachelor o.lArts in
English, Cum Laude,
Florida International
University,
1996
Certttied as a
Charrette
Facilitator by the
National Charrette
Institute, 2009, and
accredited by the
American Institute o.l
Certtfied Planners,
2010, and by the
Congress of the New
Urbanism, 2011
HONORS AND
LEADERSHIP
Bestowed Best
Implementation o.la
Plan Award by the
Miami-Dade/Monroe
Chapter of the
American Planning
Association, for
Revitalization of
Downtown South
Miami, 2rHo
-I
, I
1
I
. 1
. J
L l
(fj)
HADONNE
Land Surveyors
Mappers
GPS I GIS Services
Subsurface Utility Surveyors
Abraham Hadad, PSM, Principal in Charge/Project Surveyor
REGISTRATION: Florida Registered Surveyor and Mapper LS6006
EDUCATION: Civil Engineering Classes at the University of Santiago of Cuba, Cuba, Surveying I and II Courses
at Miami-Dade Community College, CAiCE Training, EFB/CEFB and EFBP Training, HECTOR Training, ESRI
Training, Various Surveying Seminars.
PROFESSIONAL EXPERIENCE: Mr. Hadad a Professional Surveyor and Mapper and the President of
HADONNE CORP., an established land surveying and mapping Firm located in South Florida since 2001. Mr.
Hadad is responsible for the leadership and management of the survey activities in the firm and has over 20 years
of experience and extensive knowledge of the theories, principles and practices in the land surveying field. He
has the ability to apply advanced technologies in the preparation of land surveying documents and legal
instruments and documents required to obtain or convey interests in land for public purposes. During his career
he has served in different capacities in a variety of survey projects for the Florida Department of Transportation,
Miami-Dade County, Miami-Dade Expressway Authority, City of Miami, and the private sector. Mr. Hadad has
performed and managed all types of surveying services including: Design Surveys, Right-of-Way Control Surveys,
Right-of-Way Mapping, Platting, Construction Layout, As-built Surveys and Drainage Surveys. He has shown a
great capacity to direct and coordinate the work of field and office employees in a highly conducive manner for the
purpose of performance and high morale. Mr. Hadad is responsible for the coordination of the major aspects of
each project from its approval to its completion and by applying design criteria and Land Surveying technical
Standards.
PROJECTS EXPERIENCE:
Town of Medley, NW 9ih Ave., Tracts 46 and 46 to
Intersection with NW 109 Street, located in Sec. 33-
52-40: Map of Topographic survey, research the RfW
information within Miami-Dade County RfW Division
and the Town of Medley, to establish the RfW lines
through Project area. Prime-Consultant: ZLES Mgmt.
Group.
City of Doral, Doral Park Country Club, 4824 NW
104 Ave.: Prepared Map of Boundary and
Topographic Survey of approximately 12.16 acres.
Topographic/elevations of all aboveground features.
Horizontal and Vertical Control Survey. Right of Way
lines and Lot lines verified, served as Project
Surveyor.
Miami-Dade County Transit ROW & Util. Division,
MIC Earlington Heights Connector Project:
Provided Map of Boundary and Topographic Survey
for the acquisition of 5 parcels of land for the MIC
Earlington Heights project for MD County Transit ROW
& Utility Division Overtown Transit Village.
Town of Medley, NW 138th S1. starting 200 ft South
of Okeechobee Rd. and extendin~ to the railroad,
and 300 ft. of ROW along NW 113 Ave. Rd. going
for 300 f1.: Prepared Map of Topographic and Right of
Way Survey. Elevation every 25' for the entire length
of ROW, location and rim elevation of all
manholes/catch basins, of all visible utilities.
Town of Medley Flood Mitigation Project: Right of
Way Mapping and Topographic Survey of over 36,000
L.F. of Section 4-53-40, lying Southwesterly of the
F.E.C. Rail Road in the Town of Medley
City of Miami Gardens, NW 42 Ave. Bridge
Replacement, Miami-Dade County: Provided
Horizontal and Vertical Control Survey, Topographic
Survey of all the ROW along the project corridor,
performed a Detail Bridge Survey - location of all Pile
Caps and measurements, took canal soundings.
Prime-Consultant: Metric Engineering.
Town of Medley, NW South River Drive Corridor:
Survey and Mapping Services. Prepared a base map
of NW South River Drive with Boundaries of the Town
of Medley. Requested from SFWMD the Canal 5 Base
Line Control Survey to digitize the base line and Canal
Right of Ways.
Miami-Dade Public Works Department, SW 2ih
Avenue from US1 to Bay Shore Drive: Boundary,
Topographic, & Specific Purpose Survey for Miami
Dade County Public Works Right of Way Division.
Provided location of all visible fixed improvements
within project limits, including roadway pavement,
driveways (type of driveways), sidewalks, walkways,
mailboxes, fences, trees (including trunk diameter),
etc. Provided locations of all visible above ground
utilities. Invert elevations for existing storm water and
sanitary manholes, and/or existing inlets and catch
basins. Right-of-way lines from Plats for SW 27th Ave
and all cross streets.
NE 87th S1. from NW 2nd Ave. to Farm Road and
along N Miami Ave., City of EI Portal: Horizontal and
Vertical Control Survey, Topographic Survey, Digital
Terrain Model (DTM), served as Project Surveyor.
Prime-Consultant: New Millennium Design.
HADONNE 11985 NW 88th Court. Suite 202. Doral, FL. 33172. ph.: 305.266.1188' fax: 305.207.6845' www.hadonne.com' LB7097
41
Eduardo M. Suarez, PSM, Vice President/Project Surveyor
REGISTRATION: Florida Registered Surveyor and Mapper LS6313
EDUCATION: AA--Miami-Dade Community College, 1990
PROFESSIONAL EXPERIENCE: Mr. Suarez began surveying in 1985. He became a Professional Surveyor and
Mapper in 2001. In his 25 years of experience, he has performed a variety of surveying services for the private
sector, municipalities and for the State of Florida. His experience includes: Boundary, Topographic, Right-of-
Ways, As-built's, and Geodetic Surveys. Mr, Suarez has extensive experience in providing surveying services to
the Florida Department of Transportation Districts 4 & 6.
I
1
@
HADONNE
l
I
J
, 1
l
r 1
,
I
PROJECTS EXPERIENCE:
, 1
United States Dept. of the Interior, National Park
Services, Everglades National Park, FL: Replace
two (2) Failed Plugs (Dames at Cape Sable (East of
Cape and Homestead Dams, EVER-152464 with the
United State Department of the Interior, National
Park Service. Establish Horizontal and Vertical
Control Points and layout work limits at the East
Cape Canal and Homestead Canal Dam locations,
and confirm the proposed locations at all
topographic, construction, or other items affecting
the work. Established line and grade and installed
offsets of the proposed steel sheeting structures at
the East Cape Canal Dam locations. Installed
temporary markers for the wood channel marker
piling in Lake Ingraham. Periodic on-site survey as
needed, including but not limited to layout of the
proposed mooring piles, walkway, gangway, and
final grade elevations.
Miami-Dade County, land Surveying Services for
Wharf I, located at the Port of Miami, Fl: Provided
Topographic Survey and prepared a Map of
Topographic Survey of existing ground under
existing Wharf I. Wharf I is about 850' long by 85'
wide. The topographic survey was to develop a TIN
file of the ground surface under the wharf and
extend water-ward about 30' beyond the face of the
wharf. The survey also included the location of 15-
20 geotechnical borings on the top side of the wharf
and the approximate location of 5 sections of
existing rip-rap located within the project area. The
topographic survey entailed tasks establish
Horizontal Control relative to NAD83/2007 and
Vertical Control relative to NAVD88. Control stations
to be established at +/- 1000' intervals and placed in
locations not subject to construction and able to be
verified/ utilized during construction. Created a grid
based on the location of all existing piles supporting
the wharf as necessary to delineate existing ground
conditions. The same methodologies were used to
determine horizontal location and elevations for
geotechnical borings and limits of rip-rap.
" ,
Land Surveyors
Mappers
GPS I GIS Services
Subsurface Utility Surveyors
City of Miami Beach Capital Improvements
Project Neighborhood No.7 Nautilus: (9 miles) of
Topographic Survey / Established vertical and
horizontal control for future construction / All utility
information provided / Cross sections (spot
elevations) / Tree information / All improvements
shown from Right-of-Way to Right-of-Way.
Miami Dade Seaport of Miami, Cruise Terminal D
& Terminal E Improvements: Miscellaneous
Construction Survey Services. Performed all
construction layout services for the entire project,
requested for modification and improvement to
optimize the use of existing Cruise Terminals D & E.
Miami-Dade Water & Sewer Dept., Caribbean
Blvd, from US1 to Anchor Road, Miami-Dade
County, Florida: Vertical and Horizontal Control
Survey and Baseline / Topographic Survey.
Miami-Dade County-DERM, SW 157 Ave. from
SW 64 Street to SW 42 Street, Miami: Provide all
canal right of ways, easements reservations,
roadway right of ways, and drainage easements.
Horizontal control. Baseline tied in to section lines,
fractional section lines, land lines, etc. All canal R/W
lines and easements All existing topographic
features, including but not limited to trees, utility
poles and encroaching features such as sheds,
pools, fences, headwalls, outfall pipes, and utility
canal crossings. HADONNE delivered a GIS Data
Base.
E07-WASD-07A Design of Distribution of Pipeline
for Reclaimed Water System from Central
District Wastewater Treatment Plant to Key
Biscayne (5 miles) including the Bear Cut
Channel Survey: (5 miles) Survey-Topographic
Survey / Show all improvements from Right-of-Way
to Right-of-Way / Establishing Horizontal and
Vertical Control for future construction / Cross
sections (spot elevations) / All utility information
provided/Tree descriptions
HADONNE 11985 NW 88th Court. Suite 202. Doral, FL. 33172. ph.: 305.266.1188' fax: 305.207.6845' www.hadonne.com' LB7097
42
1
1
1
Geotechnical _ Environmental _ Construction Materials _ Facilities
HUGO E. SOTO, P.E.
REGION REGIONAL MANAGER
PROFESSIONAL EXPERIENCE
Mr. Soto has 30 years of experience providing geotechnical engineering
and consulting services. These services include laboratory studies,
geotechnical design, analyses and recommendations related to the design
and construction of foundations and geotechnical exploration programs.
Mr. Soto is knowledgeable in the analysis and evaluation of field and
laboratory data, performing in-situ soil testing, in-place permeability
testing, geophysical explorations and special inspection services for
commercial structures. He has evaluated bearing capacity and settlement
for different types of shallow and deep foundation systems. His analysis
has included the evaluation of retaining walls, sheet piling systems, slope
stability analysis of conventional and reinforced embankments, evaluation
of drilled shafts, augercast piles and driven piles. His experience includes
the evaluation, design, and implementation of different subsurface
improvement programs such as the application of dynamic compaction,
preloading, compaction grouting, vibro-compaction techniques, and CSV
System. He has performed studies including monitoring vibrations of
structures during construction.
1
I
. i
PROJECT EXPERIENCE
FDOT Districtwide Materials Testing District IV, Contract No. C-
7318
Project Manager/Senior Geotechnical Engineer involved in coordination,
reviewing the field exploration, laboratory testing and geotechnical studies
to provide recommendations for roadways, bridges, MSE Walls, cantilever
walls
FDOT Districtwide Materials Testing, District VI, Contract No.
C-7732
Project Manager/Senior Geotechnical Engineer involved in coordination,
reviewing the field exploration, laboratory testing and geotechnical studies
to provide recommendations for roadways, bridges, MSE Walls, cantilever
walls
Pedestrian Bridge EI Rio Canal Pathway from Yamato Road to
L-40 Canal Boca Raton, Florida
Principal Geotechnical Engineer involved in geotechnical services in
connection with a pedestrian bridge over the existing L-40/E-4 Canal
Intersection
SR826 and N.W. 74th Street, Interchange Improvement; Miami-
Dade County, Florida
Senior Geotechnical Engineer to review field exploration, laboratory
testing and geotechnical recommendations for bridges, walls and poor
soils (trash) for this project
SR836 Interchange Improvements at the Florida Turnpike;
Miami-Dade County, Florida
Senior Geotechnical Engineer to coordinate and review field exploration,
laboratory testing and geotechnical recommendations for bridges and
walls supported on piles and shallow foundation
Education
Master of Science in Geotechnical
Engineering, Utah State University,
1980
Bachelor of Science in Civil
Engineering, Utah State University,
1979
Registrations
Professional Engineer, #56108,
Texas, 1994
Professional Engineer, #36440,
Florida, 1985
Affiliations
American Society of Civil Engineers
(ASCE)
Cuban Society of Engineers
I~O^RSE
A lr2lTCl0Jf'1 COMPANY
43
1
1
1
Geotechnical _ Environmental _ Construction Materials _ Facilities
JULIO DE SLAS, P.E.
PROJECT ENGINEER
PROFESSIONAL EXPERIENCE
Mr. De Bias has over 10 years of experience in the public and private
sectors. His experience includes the preparation and review of
geotechnical reports consisting of earth retaining structures, maritime
retaining structures including sheet pile walls, soldier pile/panel walls,
anchored walls, MSE walls, slope stability, bridge foundation evaluations
(e.g. driven piles, redundant and non-redundant drilled shafts, shallow
foundations), roadway soil surveys, and other geotechnical issues. He has
performed the structural design of sheet pile walls and other earth
retaining structures.
r l
J
PROJECT EXPERIENCE
SR 93 (1-75) PD&E Study, Miami-Dade County, Florida
Senior Geotechnical Engineer responsible for planning and executing the
field exploration and laboratory testing programs, interpreting the test
results, performing a roadway soil survey. HOR Engineering, Inc. Project
Manager: Will Suero, P.E.; Phone # (305) 728-7400. Year: 2008.
L 1
MDT North Corridor Extension Miami-Dade County, Florida
Senior Geotechnical Engineer responsible for planning and executing the
field exploration and laboratory testing programs, interpreting the test
results, performing multiple foundation analyses for drilled shaft including
post-grouted drilled shafts. PARSONS. Project Manager: Mr. Bounxou
Soukamneuth, P.E..; Phone # (786) 464-1000. Year: 2007-2008.
i -
I
MDX - SR836 Fly-over, Bridges and Walls; Miami-Dade County,
Florida
Project Geotechnical Engineer responsible for planning and executing the
field exploration and laboratory testing programs, interpreting the test
results, performing foundation analyses and design of bridges, sign
structures, MSE walls and roadway. FOOT Project Manager: Kouroche
Mohandes, PE; Phone # (305) 470-5881. Year: 2003.
SR-907 (Alton Road) PD&E Study, Miami-Dade County, Florida
Senior Geotechnical Engineer responsible for planning and executing the
field exploration and laboratory testing programs, interpreting the test
results, performing foundation analyses and design of bridges, signs and
signalization structures, and roadway soil survey. Kimley-Horn and
Associates, Inc. Project Manager: Gregory Kyle, AICP; Phone # (954) I
535-5100. Year: 2008
NW 25th Street Viaduct, Miami-Dade County, FDOT District 6
Project Geotechnical Engineer responsible for planning and executing the
field exploration and laboratory testing programs. FOOT Project Manager: i
Jason Chang, PE; Phone # (305) 470-5331. Year: 2004-2005
Education
MBA, Florida International
University, 2007
MS, Civil Engineering /Structural
Engineering
University of Miami, 2000
BS, Civil Engineering,
University of Miami, 1999
Registrations
Professional Engineer, #64653,
Florida
Professional Engineer, #29039,
Spain
American Welding Society (AWS)
Certified Welding Inspector (C. W.I)
Certification # 11111231
SR AlA at NE 94th Street and Carlyle Avenue, Miami-Dade
County, FDOT District 6
Project Geotechnical Engineer responsible for planning and executing the
field exploration and laboratory testing programs, interpreting the test
results. and providing bulk head wall analysis and design
recommendations. FOOT Project Manager: Ricardo Salazar, PE; Phone # (305) 470-5279. Year: 2005
ItloARSE
A lrerrocnn COMPANY
44
r1
r 1
r 1
. I
, 1
I '1
· 1
, 1
, J
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE
BID NO. 11-11-02
· '-AN'O METHODOLOGY
Municipalities and publicly-owned utilities have been our backbone clients
since shortly after our firm's formation. C3TS is mainly a Civil Engineering
company with 23 years of experience successfully serving municipal clients, We ,
know that Municipal needs stem from the natural mission of a municipality, which is
to serve its citizens with necessary services at a high value - meaning a high ratio of
quality to cost. Our mission, therefore, has been to provide high value services to
our clients, by understanding those needs and working hard to satisfy them, and
exceed them, In so doing we become an extension of our client by making their
mission ours as well. And it is for this very reason that C3TS has succeeded in
maintaining a long list of repeat municipal clients, with whom long relationships have
been formed.
The main priority is to develop an organizational structure that meets the needs of the Owner by placing experienced staff at their
disposal. To this end, an organizational chart is included that indicates the personnel that we are committing to this contract. Please
note that even though individuals have been indicated by their main area of expertise, almost all individuals possess experience and
talent that allows them to perform many other civil engineering related tasks beyond that which is shown, to collaborate on projects,
and to serve as formal or informal quality reviewers and in support to those individuals in the primary assignment.
The second priority is to establish clear lines of communication and responsibility, as well as the methods by which all project tasks are
assigned and handled, For this project we have selected Mr. Daniel Grandal, PE, CFM, LEED AP as the project manager and point
of the contact due to his strong drainage background and ability to execute successfully on projects time and again, completing
projects on time and budget. Mr, Grandal is a Principal Associate of our firm and will commit his time to the management of this
contract, and has the knowledge, experience, and utilize all available resources and manpower to complete the task successfully. Mr.
Jorge Corzo, PE, CFM will be the principal in charge and is the founding partner of C3TS, Mr. Corzo has extensive background in
similar projects and hands on approach to projects will be the City's liaison in overseeing the progress and will ensure the project's
success.
SPECIFIC PROJECT TECHNICAL APPROACH
As part of the preparation of this proposal, the cns team has performed a
site visit and some preliminary site investigation. We are aware that a
drainage project was recently conducted at the adjacent Center Island Project Area
to address flooding which included the addition of drainage wells and removal of
existing outfalls to improve the water quality of discharges to the bay. The scope of
this project includes design development to for the drainage system along 174
Street from Collins Avenue to a few hundred feet east of the North Bay Road at the
first road curve. The roadway is a 4 lane divided roadway with extremely low
elevations range between 4.0' to 5.5' NGVD in some areas. There is existing
drainage structures along 174 Street with damaged curb and pavement along the
route. The contributing drainage area extends beyond these limits and may include
some of the private properties including Winston Towers, The system may have
exfiltration trenches and be connected to existing outfall pipes that provide drainage for larger storm events. The existing system has
been identified as a flood prone area as a result of inadequate drainage facilities or a deterioration of the existing system capacity, The
existing drainage system will be researched and evaluated as part of our initial investigation,
45
'1
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVEMe '1J;.~';
BID NO. 11-11-02
D METHODOLOGY
Our technical approach to this project would begin in the programming and
schematic design phase including permit research, limited survey and geotechnical
testing, field investigation to establish the condition of the existing system,
coordination with the City regarding their goals, meeting with all permitting agencies
and public coordination to obtain resident concerns, Of course, all residents will
, 1 want adequate drainage, but meeting with the stakeholders early on in the process
I allows them to provide their suggestions and concerns, and will help to garner their
support for the elements of the project.
, 1
I
I '1
1 I- 1
I
We will look at the potential for additional drainage in the form of a
combination exfiltration
trenches, drainage wells and
positive drainage outfalls but will also identify any other potential solutions
that will fall within the project budget. The existing and proposed drainage
systems will be analyzed and modeled using ICPR or other modeling software. We
will analyze and model the existing system to determine various possible solutions to
prevent flooding in the area, These models will allow us to evaluate benefits for
several alternate solutions. Finished Floor Elevations (FFE), garage elevations, and
yard elevations will be analyzed to quantify the level of protection provided to the
resident's private property by the drainage improvements in compliance to FEMA
CRS guidelines and assist the City in applying for CRS credits if available.
Our approach takes a holistic approach at addressing the problem and
is prudent given the existing flooding conditions. We believe that simply
providing a piecemeal solution by adding catch basins and some exfiltration
trenches may be a short term fix but is not the long term solution. In reality,
adding only exfiltration trenches to comply with minimum regulatory
requirements within the limited ROW will help marginally on localized
ponding for small events but may not address the overall problem in the
entire contributing basin area, Many times inadequate drainage systems
within private property will cause overflows into the ROW during large
storms overwhelming the roadway drainage systems. A combination of
drainage facilities including drainage wells, outfalls to take advantage of the
nearby bay and exfiltration trenches that address both quality and larger
storm events for the entire contributing area will produce a long term solution. C3TS is experienced in easement acquisition and can
assist the City if it is required for a new outfall. We can assist the City with all aspects of this project and long term approach will
provide adequate drainage meeting city's and resident's expectations as well as save the City money by protecting their assets
(roadway pavement, curb, gutters and sidewalks).
C3TS has a proven track record in the evaluation, design and rehabilitation of drainage wells and exfiltration drainage systems with
overflow outfalls, We have provided these services for many local municipal, county, and state agencies throughout Florida. We are
extremely familiar with the local conditions having worked in extremely similar conditions for coastal communities including Golden
Beach, Key Biscayne, Miami Beach, North Bay Village and North Miami Beach to name a few. Our staff are local drainage experts
who are attune to the solutions for the project conditions and the regulations which need to complied with. '/'Ie have vast experience
~ith FOOT and working within their standards which is relevant to this project due the adjacent FDOT roadway - Collins Avenue A1A!
In fact our in-house experts wrote the Exfiltration Systems Handbook for the Florida Department of TransQortation, as seen on thei~
tvebsite located at: http://www.dot.state.fl.us/rddesiqn/dr/files/EXFIL TRA TION-HB-2007,pdf!
46
~l
r I
'1
. I
I
, t
, 1
L 1
I r 1
. J
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE
BID NO. 11-11-02
.. NoD METHODOLOGY
The condition of pavement, curb and gutters and sidewalks will be analyzed and recommendations for
their repairs will be provided to City for inclusion in the project. C3TS has work on many Sidewalk and
Pavement evaluations for entire municipalities and can apply our knowledge to this project.
The alternates will then be priced out with the latest construction costs based on C3TS internal database
which combines established construction cost benchmarks with recently bid projects. This will determine
which solutions are viable within the project's budget. C3TS will make a recommendation of the best
cost / benefit solution,
The City's chosen solution, whether it is the C3TS recommended solution or another solution, will then
be developed into a full set of construction plans and specifications through several phase submittals
and reviews including meetings with applicable permitting agencies, The process will include public
involvement and coordination with all stakeholders,
At each phase submittal a cost estimate would be provided, Accurate cost estimates are a crucial factor in staying on budget and is
critical to a successful technical solution. C3TS has a solid track record of being within 1 % to 5% above the actual project costs, Our
cost estimates are based on our internal database from bid projects which is constantly updated whenever a new project is bid, This is
further adjusted based on state and federal cost databases including FOOT, RSMeans and other databases which are updated yearly,
We will update the cost for each submittal and include escalation cost, contingencies, permit fees and any other costs which may be
encountered,
Once complete a fully permitted project package will be tailored to the selected construction delivery method whether it be standard
bid, preselected contractors bid, CM at Risk or Design-Build.
As part of this effort, C3TS's in-house grant's division can assist the City to identify potential grant funding to expand the scope for this
project or even future projects.
In summary, our technical approach will consider and model various options providing cost estimates throughout the process.
Drainage experts will work with the City Engineer, residents and permitting agencies in the process to find the most effective solution to
maximize the project funds, The C3TS Team will then implement the plan by preparing quality construction documents, permitting
them and getting them constructed on time and on budget.
CONCLUSION
cns is committed to excellence in providing professional services resulting in complete solutions for the City of Sunny Isles
Beach and specifically the drainage improvements on this project. This proposal package details our understanding of the
project, as well as all additional information required for your evaluation. We look forward to working with the City of Sunny
Isles Beach and demonstrating the quality for which C3TS is known. Our clients have come to value our unique combination
of success and commitment to excellence.
ADDITIONAL cns QUALIFICATIONS
DRAINAGE AND ROADWAY PROJECTS
The C3TS Team has a great deal of experience in drainage and roadway projects in the Miami-Dade County area, We are local
experts for drainage facilities of all types, including their benefits and cost. We have experience with exfiltration trench systems, slab-
covered trench systems, dry & wet detention, pump stations, gravity wells, pumped wells, and direct outfall to the drainage canal and
other water bodies. Our approach to a roadway and drainage design starts by evaluating all possible solutions for effectiveness, cost
and permitability, We model all our drainage designs using advanced software programs like ICPR, HEC and GIS to establish the
47
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE ~5~~ '
BID NO. 11-11-02
N~D METHODOLOGY
r 1
J
effectiveness of the proposed solutions for varying storm events, Our Team will provide several solutions with their associated cost
estimates and our recommendations for the City's evaluation. When the proposed solution is selected, we will prepare plans and
specifications in accordance to local, state and federal regulations, Our familiarity with these projects will allow us to quickly get the
project designed, permitted and constructed.
, 1
J
C3TS has extensive experience in roadway improvements, beautifying areas with streetscape and landscaping while providing
necessary infrastructure including drainage, water and sewer, Additional engineering experience includes numerous roadway
improvements including widenings, reconstruction, drainage upgrades, signalized intersections, and traffic calming, as well as major
highway and interchange work. C3TS provides an integrated approach with innovative solutions to satisfy the City and its residents.
I ,
A few examples of our recent experience are shown in the related project experience and range from small localized ponding projects
to large regional drainage studies, Of special note is Belle Meade Drainage and Roadway Improvements which was recently
completed for the City of Miami. This project consisted of drainage and roadway improvements for over 60 acres of residential
neighborhood on the coast. The area is tidally influenced and many of the roadways were built below the seasonal high tides. As a
result, the street floods up to two feet of water several times during the year. The existing drainage system did not meet the minimum
standards established by the City and was extremely flood prone. C3TS analyzed several solutions including pump assisted wells,
exfiltration trenches and a large pump station, The City decided to go with a combination of oufall to the bay via a large pump station
for the lower areas assisted by exfiltration trenches for the areas with higher elevations. In order to minimize cost, a resurfacing plan
with a combination of milling and resurfacing and partial reconstruction was developed. Additional elements of the project included
sidewalk repairs, new curb and gutter, lighting improvements, and landscaping, The project was completed successfully and for the
first time since its inception, the residents do not have to deal with tidal flooding and are protected up to a 100-year storm event.
-! I- 1
STORMWATER MASTER PLANNING AND ASSET MANAGEMENT
The C3TS Team is experienced in the preparation and execution of Stormwater Master Plans and Floodplain Managements Plans.
C3TS is proud to have assisted the City of North Miami in the preparation of the North Miami Floodplain Management Plan that
successfully improved the City's CRS Class 4 which it has maintained, We also recently assisted Miami Lakes in obtaining a CRS
Class 4 from a Class 6.
Our team has the expertise in local drainage solutions and hydraulic modeling to prepare a superior master plan that will focus on
feasible solutions. We have not only planned but also constructed the drainage facilities including pump stations, exfiltration trench
systems, direct outfalls to canals or other water bodies, gravity and drainage wells, Our extensive experience in local drainage
systems and conditions will help strengthen the master plan by providing viable solutions with accurate cost and schedules, Drainage
solutions would be provided for varying levels of protection including schematic design and cost estimates. This allows the City to
submit for grant funding for projects that provide higher level protection with funding that was previously beyond the City's reach. These
projects providing protection for 25-year and 100-year storms would be eligible for credit under FEMA's Community Rating system to
potentially improve the City's Class.
PUBLIC PRESENTATIONS AND PUBLIC HEARINGS
It would not be uncommon for the Civil Consultant to be asked to make public presentation before the City Commission, before other
regulatory bodies, or to the public, C3TS is very experienced and knowledgeable in making such presentations, preparing exhibits,
handouts, and responding to questions in non-technical language that is understandable to residents and stakeholders, We have
made presentations to elected bodies as well as to the public at public hearings and at informal neighborhood gatherings, and we have
conducted charrettes and brainstorming sessions, some with the public present and others with stakeholders. When conducting
charrettes and brainstorm sessions, we have guidelines for the facilitator and the group to follow.
48
f-I
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE
BID NO. 11 - 1 1 -02
r I
. 1
J
, j
, ,
, ,
. J
'NtD METHODOLOGY
COST ESTIMATING AND SCHEDULING CONTROL
C3TS is experienced in permit and plan production scheduling for certain types of projects, Permitting can affect the cost estimate
from the basis that last minute changes required by agencies can sometimes blow estimates out of the water and cancel projects
altogether. We shall determine all possible impacts early on so that the preliminary cost estimates stay relatively the same as the plans
are finalized, A schedule shall be submitted at the NTP so the City can track production as well as permitting all the way through bid
and security of contractor. Construction material costs have varied greatly over the last few years causing a lot of problems with
accurate cost estimates, C3TS has general contractors on staff as well as experienced construction administrators to ensure that cost
estimates are current and realistic,
QUALITY CONTROL
At C3TS, we use the most current technology, which allows for optimum and accurate design, We use an in-house peer review Quality
Control/Quality Assurance (QAlQC) program to complete our assignments within schedule, at budgeted cost, and with high quality
and reliability, All work is executed in conformance with applicable codes and standards, The work of any sub-consultants we use is
subjected to the same review as our C3TS generated work.
We are proud to be able to say that, over the past 10 years, our firm-wide errors and omissions resulting in claims are less than Y2 of
1 % of construction budgets. This is due to the following:
Principal Involvement during all stages of design and construction
Proper matching of tasks to individuals
Complete team formation from the start
Clear assignments of responsibilities
Established and adhered-to QA / QC Program
Independent peer review prior to major deliverables
PLAN METHODOLOGY
The C3TS quality control team utilizes a two-part independent checking process for its projects. First and foremost is the development
of the QC program to verify that the project analysis methods and work products meet or exceed the requirements of the project scope
for all work items, are free of errors and omissions, and are based on sound practices and principles, Second is the development of
the QA program to assure that the QC program is being complied with and is effecting compliance with the project scope of services.
Basic tenets of the QC program include:
../ The project manager has complete authority and responsibility to execute the work.
../ A "kick-off' meeting will be held with key members of the project team to define the scope of work and the quality requirements.
../ All project decisions will be documented.
../ All supporting calculations, text or data used to develop the project documents will be signed and dated by the preparer when
the work is performed, All telephone conversations and meetings, which include or affect a project decision, will be documented.
Minutes of meetings will be prepared and distributed to attendees for confirmation of decisions made and then filed after
appropriate action.
../ All project documents will be reviewed and/or checked by qualified individuals who are not directly performing the initial work
activity. The individual doing the checking will sign and date the documents and will prepare a record of review after checking
the findings. The findings will be resolved by the originator of the document and rechecked until satisfactorily resolved.
49
rl
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE
BID NO. 11-11-02
o. 'v"
r J
./ The Project Manager or designated alternate(s) will monitor and evaluate the review and/or checking activity for the project. The
review will specifically cover such items as clarity, accuracy, completeness, scope compliance, etc. Any follow-up activity
required will be noted and initiated as appropriate.
r 1
I
I
./ Individuals independent of project staffing will periodically and at specific targets review all project development documents for
adequacy, conformance with the scope of work, completeness, accuracy, and proper documentation,
CONSTRUCTION SERVICES
The C3TS Team includes a Construction Administration division fully staffed with knowledgeable inspectors experienced all types of
municipal projects. Our construction managers are seasoned engineers with experience in competitive bid contracts, the standard
contract languages used by municipalities, including the EJCDC and AlA issued documents, the conditions issued by FDEP on SRF
Loan contracts, and are experienced with the documents that protect the Owner. The C3TS Team has an organized process for bid
evaluations, award recommendations, and NTP procedures, as well as submittal review, stamping, and record keeping, Additionally,
the inspector's logs and records, including site photographs are all maintained electronically and delivered to the Owner with the
contractor's payment requests, or as requested by the Owner, We are very familiar with the regulatory requirements that must be
fulfilled and the close-out documents that are necessary to be satisfactorily presented before we certify a project as complete.
. I
Having worked on projects whose funding can be from multiple sources, we usually develop checklists that are sometimes project
specific, but more often than not have similar if not identical requirements, and these are used to substantiate payments. All of our
inspectors, and many of our engineers have special certifications for different trades or systems, and we assign these individuals to a
project when needed. These include structural, electrical, mechanical, LEED, pavement, and maintenance of traffic, We understand
our job, our responsibilities, as well as our limitations of authority, and we make sure contractors understand them as well, which makes
for a smoother construction inspection and review process. Some of our staff have special OSHA training, including confined spaces,
chlorine facilities, haz-mat, and others, If an individual requires training, it is done prior to the start of the project, and usually indicates
that the contractor must also have similarly trained individuals and the certificates provided for our records and the City's.
r 1
. ,
SURVEYING SERVICES
HADONNE's approach to the project is to provide the consultant with a 3D rendering of both the underground utilities and aboveground
imQrovements of the entire Qroject corridor! This approach will provide extreme value for both the City multiple ways, resulting in
significant cost and time savings throughout the design and construction phases, To begin HADONNE will coordinate with all the utility
companies, collecting any as-built or pertinent information relative to the project. HADONNE would also investigate any outfall locations
that may be mentioned on plans and physically inspect the surrounding areas for physical evidence of any outfalls within the project site
that may be incorporated into the final drainage design. HADONNE would then have all the utilities physically marked on the entire
~ect site and begin performing underground utility exploration, using a variety of methods and the latest egyjRment such as,.ground
Renetrating radar (GPR),..msgnetic locating and soft digg Once the underground utilities are all marked on the job site, HADONNE
would then move onto 3D mapping of all the aboveground improvements. This will be done combining both conventional survey
methods and the latest in 3D Laser Scanning capabilities. An added side benefit of the aboveground 3d scanning, is that it will allow
the City or Consultant to assess the quality of the pavement from a computer. Once the underground and aboveground surveys have
been completed they would be combined to provide the consultant a 3D Model of the entire corridor above and below ground. This
would provide not only a visually appealing product, but an actual working drawing that the engineers will find extremely useful for their
engineering needs, The City would also benefit indirectly. Once the survey is done, the City need not shelve it, but use it as template
for future GIS projects, for the eventual 3D Model of the entire City.
50
r 1
r 1
I 1
r 1
r 1
I
, 1
~ J
, J
. J
t . j
. ~
. I
Public Works Department
Rofoel G. Cosols
Public Works Director
November 18, 2010
T own of Miami lakes
AUn: Town Clerk's Office
15700 NW 67th Avenue, Suite 302
Miami lakes, Florida 33014
Reference:
Corzo Castella Carballo Thompson Salman, PA (C3TS)
Please accept this letter of reference for the firm Corzo Castella Carballo Thompson Salman, PA (C3TS)
Contract Name:
Town of Cutler Bay Old Cutler Roadway Improvements
Contract Date:
March 2010 - On-qoinq (Biddinq Phase)
Contract value: $475,000.00
Description':
C3TS was contracted by the Town of Cutler Bay to design improvements for the portion of Old Cutler Road between SW 971h
Avenue and SW 871h Avenue. The project consists of improvements including roadway improvements, traffic circles, pavement
resurfacing, sidewalks, drainage facilities, medians, landscaping and lighting.
Old Cutler Road is designated a historic roadway which required all improvements to respect the existing roadway footprint,
thus limiting the modification and/or additional widening of the road. This Miami-Dade County roadway is considered an
arterial collector roadway. The proposed configuration for Old Cutler Road will include roundabouts at each end of the
corridor for traffic calming and beautification. The 1.24 mile corridor between these two roundabouts will be a two lane
roadway with turn lanes, landscape medians and additional stormwater drainage structures. Permitting included various
Miami-Dade County Public Works Division and Miami-Dade DERM. The project is entering the bidding phase and construction
cost is estimated to be $ 7,100,000.
Reference:
The consultant has performed very well, throughout this project. This project required a great deal of community outreach and
coordination with Miami-Dade County Public Works and the State of Florida. The project design was completed within the
allowable timeframe and within budget.
If you should have any question or require any further information, please contact me at 305-234-4262 or via em ail at
rcasals@cutlerbay-f1.gov.
Sincerely,
\7-{~~
Rafael G. Casals
Public Works Director
10720 Caribbean Boulevard, Suite 105 . Cutler Bay. FL 33189 . 305-234-4262 . www.cutlerbay-fl.gov
~~~-~~>;.-~~
51
t -I
r 1
1
TOWN OF GOLDEN BEACH
One Golden Beach Drive, Golden Beach, FL 33160
Office (305) 932-0744 · Fax (305) 933-3825
www.goldenbeach.us
t 1 Alexander Diaz
Town Manager
November 30, 2011
Corzo Castella Carballo Thompson Salman, P A
901 Ponce de Leon Boulevard
Suite 900
Coral Gables, Florida 33134
~ J
Dear Sir I Madam,
I would like to take this oppOlwnity to congratulate you and thank you for your excellent work in
the Town of Golden Beach.
C3TS has worked on various Capital Improvement Projects throughout the Town and has
maintained a high level of professionalism and service in all phases from conceptual design through
construction inspection.
1 -!
Throughout our relationship, we have found the firm to be very professional and responsive to our
concems. All of the personnel, from the principals to staff, demonstrate the same professional
approach to the task at hand. Assignments are always completed on time and within the original
budget. Through your eff0l1s, I know that the Town of Golden Beach was able to achieve a greater
value for our budget.
Again, thank you on behalf of myself and the Town of Golden Beach for a job well done.
Sincerely,
tJ~~
Alexandel' Diaz
Town Manager
52
'1
I
f .'
c 1
VILLAGE
o F
KEY
BISCAYNE
Department of Public Works
I 'illage COIII/dl
Robert L. Vernon, ,\!I!yor
:--[ichac1 Davey, ["ice A!I!/,or
Enrique Garcia
Robert Gusman
:--richael E. Kelly
.lorge E. ~[endia
Thomas Thornton
Dim'fOr
Armando 0llllicz
July 16, 2009
Monroe County Purchasing Office
1100 Simonton Street, Room 1-213
Key West, Florida 33040
To Whom It May Concern:
Dear Sir I Madam,
I am pleased to write a letter of reference for the firm of Corzo Castella Carballo Thompson Salman, P.A.
(C3TS).
The Village of Key Biscayne has an existing contract with C3TS and has benefited greatly in working with
C3TS as their Consultant since April 2007.
They have worked on several drainage I civil works projects with the Village, including the recently
completed Crandon Boulevard Streetscape Improvements. In all instances, C3TS has maintained a high
level of professionalism and services.
It is pleasure dealing with not only competent and knowledgeable professionals but with courteous and
reliable individuals who exhibit great workmanship and have extreme attention to detail. The Village is very
lucky to have ongoing projects with C3TS and looks forward to future projects with them as our engineering
firm. /
~ .
Sincerely, ~/~ ~
Armando Nunez, Director ..--J~
U/
88 West McIntyre Street · Suite 230 0 Key Biscaync, Florida 331:i9 0 (305) 365-8945 · Fax (305) 365-7757
~n;;lo:-; ;T.ITE~IF.:-;T "TO I'RO\'lDE.I 5..",1'.. Ql..ILlTY CO~I~ILSITY E:';\'IRO:\.\IE;-..--r FOR .1l.L 15L\:-;OI'.R5 THROl"GH RI'.;I'O:\5IBLE GO'''ER.,~IE:\T''
www.l<cyhiscaYllc.fl.gov
53
)
I
1
.
r 1
r ,
I
.
l
I 1
. ~
Town of Medley
7777 Northwest 72nd Avenue
Medley, Florida 33166.2488
Jorge Soto
Assistant Director
Project Coordinator
Utilities & Storm Water Department
Office: (305) 889-1915 ext. 224
Fax: (305) 889-1917
"The Perfect Locationfor Industrial Development"
November 30, 2011
Corzo Castella Carballo Thompson Salman, PA
901 Ponce de Leon Blvd, Suite 900
Coral Gables, Florida 33134
Reference: Corzo Castella Carballo Thompson Salman, PA
The Town of Medley is pleased to submit this letter of reference for the above mentioned firm of C3TS.
The Town has had a successful working relationship with C3TS since 1994. Projects have ranged from
Wastewater Collection Systems to Drainage Improvements and from Pump Stations to Shoreline
Restorations.
In all our relationship, C3TS has showed a professional demeanor and has proven to be attentive and
responsive to the Town's concerns and issues.
These projects were delivered successfully on time and within budget. I would certainly recommend this
firm for similar services.
---
-1
Jorge Soto
Assistant Director of Utilities
54
l
r J
'1
r I
, 1
I
, I
. J
,. ,
.. J
. ,
. .
CIVIL ENGINEERING SERVICES
TO DESIGN STREET AND DRAINAGE IMPROVE
BID NO. 11-11-02
A listing of all Office Locations (including address, phone numbers and point of contact).
Headquarters:
901 Ponce de Leon Blvd, Suite 900
Coral Gables, Florida 33134
Tel. 305-445-2900
Contact: Jorge E. Corzo
Fort Lauderdale
3996 NW 9th Avenue
Fort Lauderdale, Florida 33309
Tel. 954-565-2113
Contact: Jeffrey S, Crews
Boca Raton
21301 Powerline Road, Suite 311
Boca Raton, Florida 33433
Tel. 561-487-3379
Contact: Terrance N. Glunt
Orlando
11315 Corporate Blvd, Suite 105
Orlando, Florida 32817
Tel,407-823-8966
Contact: Xavier Arroyo,
55
'1
r 1
r 1
"1
I
,
. J
r 1
..
. I
NON-COLLUSION AFFIDAVIT
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone (305) 947 -0606 Fax (305) 949-3113
STATE OF FLORIDA )
COUNTY OF ,.Miami-Dade)
The undersignecl being first duly swom as provided b~llaw, cieposes, and says
Trlis Affidavit is made with the knowledge ancl intent that it is to be filed witrl the City of Sunny Isles Beach City Commission and that it 'will be
relied upon by said County, in any consideration which may give to and any action it may take with respect to trlis Bid
The undersigned is authorized to make this Affidavit on behalf of,
Corzo Castella Carballo Thompson Salman, PA
-----------------
(Name of Corporation, Partnersllip, Individual, etc.)
a, Corporati~_____, formed undedlle laws of _ Florida __
(Type of Business) (State)
of which he is ~oundingJJincipal _______
(Sole Owner, Partner, President, etc.)
Neither tile undersigned nor any person, film, or corporation named in above Paragraph 10,2, nor anyone else to the knowledge of tile
undersigned, have themselves solicited or employed anyone else to solicit favorable action for tllis Bid by the City, also that no head of any
department or employee therein, or any officer of trle City of Sunny Isles Beacrl, Florida is directly interested therein.
This Bid is genuine and not collusive or a sllam: the person, firm or corporation named above in Paragrapll '10.2 has not colluded, conspired,
connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid, or that such person, firm or
corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication
or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any otrler proposers: and all statements contained in
the Bid or Bids described above true: and fiJrther: neither the undersigned, nor the person, firm or corporation named above in Paragraph
10.2, Ilas directly or indirectly submitted said Bid or the contents thereof, or divulged information or clata relative thereto, to any association or
to a member or agent thereof.
~
orzo, PE, CFM
------
AME
Founding Principal
----------
AFFIANT'S TITLE
T,l\KEN, SWORN AND SUBSCRIBED TO BEFORE ME tllis ~y of _~elt?~~, 20,j
Personally Known _~_ or Produced Identification __:
T~lpe of identification__________
(Affix seal here)
~un~~~
---------
NOTARY PUBLIC (name printed 01" typed)
AURORA ELENA RODRIGUEZ
MY COMMISSION # EE 074455
EXPIRES: July 16,2015
Bond~d Thru Notary Public Underwriters
DECEMBER 28,2010
1 of 7
56
r 1
r I
I
'I
,
1
r 1
'I
I c J
. .
PUBLIC ENTITY CRIMES
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
Of svt-&
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STAnJTES, ON PUBLIC ENTITY CRIMES
PUBLIC ENTITY CRIMES
Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate
who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a
Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a
public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of
real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or
Consultant under a Contract with any public entity, and may not transact business with any public entity in excess
of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on
the convicted vendor list".
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER
OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
11.1. This sworn statem ent is submitted to City of Sunny Isles Beach
by
Jorge E. Corzo, PE, CFM
Ipunt InmVIDlIal s name anD ttllej
for Corzo Castella Carballo Thompson Salman, PA
IPunt name of entity slIbmltling sworn statementj
whose business address is:
901 Ponce de Leon Blvd, Suite 900
Coral Gables, Florida 33134
and (if applicable) its Federal Employer Identification number (FEIN) is 65-0039493
(If the entity had no FEIN, include the Social Security Number of the individual signing this sworn
~~eme~: .)
11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a
violation of any state or federal law by a person with respect to and directly related to the transaction of
business with any public entity or with an agency or political subdivision of any other state or with the
United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any
public entity or an agency or political subdivision of any other state of the United States and involving
antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation.
11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a
finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any
federal or state trail court of record relating to charges brought by indictment or information after July 1,
1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere.
11.4. I understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means:
a.)
predecessor or successor of a person convicted of a public entity crime; or
b.)
Any entity under the control of any natural person who is active in the management of the entity
and who has been convicted of a public entity crime. The term "affiliate" includes those officers,
directors, executors, partners, shareholders, employees, members, and agents who are active in
the management of an affiliate. The ownership by one person of shares con~ituting a controlling
interest in another person, or a pooling of equipment or income among persons when not for fair
2 of 7
DEe EMBER 26, 2010
57
r 1
~ 1
11.5.
r 1
I
"1
11.6.
X
,. \
I
market value under an arm's length agreement, shall be a prime facie case that one person
controls another person. A person who knowingly enters into a joint venture with a person who
has been convicted of a public entity crime in Florida during the preceding 36 months shall be
considered an affiliate.
I understand that a "person" as defined in Para. 287.133(1 )(e), Florida Statutes, means any natural
person or entity organized under the laws of any state or of the United States with the legal power to
enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or
services let by a public entity, or which otherwise transacts or applies to transact business with a public
entity. The term "persons" includes those officers, directors, executives, partners, shareholders,
employees, members, and agents who are active in management of any entity.
Based on information and belief, the statement which I have marked below is true in relation to the entity
submitting this sworn statement. (Indicate which statement applies.)
Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, nor any
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of
Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the
State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer
determined that it was not in the public interest to place the entity submitting this sworn statement on the
convicted vendor list. (Attach a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE
PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND,
THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FilED. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO
A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA
STATUTES, FOR CATEGORY TWO OF AN CHANGE IN THE INFORMATION CONTAINED IN THIS FORM.
By: ~
(Signature)
Jorge E. Corzo, PE, CFM
(Printed Name)
Founding Principal
(Title)
~worn to a~ s~scribed before me this
V 6 r'j e. t::.. L.f!!Ji' z--t:J
.I ~ay of ~ ~/-f-'1 , 20~, by
~/~~
(AFFIX NOTARY STAMP HERE)
Signature: Notary Public - State of Florida
Personally Known yo
/
Type of Identification Produced
Print or Type Commis '
:~~Aj(..vrPlf1:. AURORA ELENA RODRIGUEZ
OR P d d Id t.f' t' i-: 'ai MYCOMMISSIONHEEOl4455
ro uce en I Ica Ion ~~" ~i EXPIRES: July 16, 2015
".r.Rf.~i-'- Bonded Thru Notary Public Underwriters
10/19[18
3 of?
58
~l
'1
r I
, 1
I
r J
f I
. I
I
J
i
. J
EQUAL OPPORTUNITY /
AFFIRJ\lIA TIVE ACTION
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax (305) 949-3113
EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT
The contractors and all subcontractors hereby agree to a commitment to the principles and
practices of equal opportunity in employment and to comply with the letter and spirit of
federal, state, and local laws a nd regulations prohibiting discrimination based on race,
color, religion, national region, sex, age, handicap, marital status, and political affiliation or
belief.
Signed:C2tt~
Title: Founding Principal
Firm:
Corzo Castella Carballo Thompson Salman, PA
Address:
901 Ponce de Leon Blvd, Suite 900
Coral Gables, Florida 33134
DECEMBER 28, 2010
4 of 7
59
'1
'1
<1
. 1
I
r 1
. 1
I
. 1
I
r 1
I
"
CONFLICT OF INTEREST
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
CONFLICT OF INlEREST STATEMENT
The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must
disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the
City of Sunny Isles Beach or its agencies.
STATE OF FLORIDA
COUNTY OF Miami-Dade
BEFORE ME, the undersigned authority, personally appeared Jorge E. Corzo, PE, CFM
deposes, and states:
who was duly sworn,
18.1.
the
Founding Principal
with a local office in Coral Gables
of
and principal office in
am
C3TS
Coral Gables
18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No. 11-11-02 described
as: Landscape Maintenance Services. The Affiant has made diligent inquiry and provides the information contained in this
Affidavit based upon his own knowledge.
18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has
no financial interest in other entities submitting Bids for the same project.
18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in
any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for
the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and
I execution of the Contract for this project.
18.5 Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or otherwise ineligible ITom
participation in contract letting by any local, State, or Federal Agency.
18.6 Neither the entity, nor its affiliates, nor anyone associated with them have any potential conflict of interest due to any
other clients, contracts, or property interests for this project.
18.71 certify that no member of the entity's ownership or management is presently applying for any employee position or
actively seeking an elected position with the City of Sunny Isles Beach.
18.81 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City
of Sunny Isles Beach.
18.9 In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will
immediately notify the City of Sunny Isles Beach.
Dated this /6/- day of . , 201~.
-::tCHC'(l e .01" Z-6
AFFIANf rI tor Typ Name and Title
SWorn to and subscribed before me this i!1.... day of ~ . 201;.
~ Personally Known OR .
. 0 Produced Identification ; Type of Identification
~1t4f
NOTARY PUBLIC STATE OF FLORIDA
~-e
l;j:&\j\~iW;;.:-. AURORA ELENA RODRIGUEZ -Ii ~
I.: ':.~ MY COMMISSION # EE 014455 ~
":.i'" .,.W EXPIRES: July 16, 2015 ~
'~iff.,r,.~.. Bonded Thru Notary Public Unden'lraGr~ 'I'~
~
i'!-(;
DECEMBER 28, 20'10
5 of 7
60
, 1
I
, I
r I
I
1
I
,
r I
I
. r
. 1
I '.
, 1
I L J
DISPUTE DISCLOSURE
City of Sunny Isles Beach
18070 Colli ns Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
DISPUTE DISCLOSURE FORM
Answer the following questions by placing a "X" after "Yes" or "No". If you answer "Yes", please
explain in the space provided, or on a separate sheet attached to this form.
19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the
Department of Professional Regulations or any other regulatory agency or professional associations within the last
five (5) years?
YES
NO
x
19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a
contract or job related to the services your firm provides in the regular course of business within the last five (5)
years?
YES
NO
x
19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests,
or litigation in the past five (5) years that is related to the services your firm provides in the regular course of
business?
YES _____ NO __~_ If yes, state the nature of the request for equitable adjustment, contract
claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the
monetary amounts of extended contract time involved.
I hereby certify that all statements made are true and agree and understand that any misstatement or
misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid
for tne City of Sunny Isles Beach.
_ Corzo -.fastella Carballo Thompson Salman, P~
Fi
_~2 //1-2 t) /1________
~~e
Jorge E. Corzo, PE, CFM, Founding Principal
---------------
Print or Type Name and Title
DECEMBER 28,2010
60f7
61
'1
'1
, 1
I
. )
, 1
I
,
r ,
I I
r I
. ,
. . I
, .
. ,
STATE OF FLORIDA
)
)
)
COU NTY OF Miami-Dade
ANTI-KICKBACK
City of Sunny Isles Beach
18070 Collins Avenue
Sunny I sles Beach, FL 33160
Telephone (305) 947-0606 Fax: (305) 949-3113
ANTI - KICKBACK AFFIDAVIT
I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid
will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a
commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or
by an officer of the corporation.
By:
Title: Founding Principal
_ J)~egOing instrument was acknowledgJ'd before me this !~ day of
~ , 20L by Ii -e y-- I c&r 2--0 [name
of Rerson], as 1~(1rc. [type of authority], for
r:;. 3 'TS [name of party on behalf of whom instrument was
executed].
AFFIX NOTARY STAMP HERE:
~~
Notary, ublic - State of Florida
AURORA ELENA RODRIGUEZ ""/:1
MY COMMISSION # EE 074 '
Print 0 ~ml: U~~/Isl~
Hl
Personally Known ~. OR Produced Identification
Type of Identificatian Produced
DECEMBER 28, 2010
7 of 7
62
~l
i
1
I
I
DELIVER TO:
t :=ity of 9jnny Isles Beach
City Clerk
I
18070 Collins Avenue
Sunny I sles Beach, FL 33160
I
REQUEST FOR.
QUAUFICA TIO\S
SECTIO'\J 6
BID SUBMITTAL FCRMS
OPENIf'...G: 10:00 A.M.
12-02-11
PLEA9:: QUOTE PRICES F.O.B, DESTIf\JA110N, LES3 T.6.xES, DELIVERED H~
CITY OF 9JNf\JY ISLES BEACH, FLORIDA
NOTE: City of Sunny Isles Beach is exempt trom all taxes (Federal, State, and Local). Bid price should be
less all taxes. Tax Exemption Certificate furnished upon request.
,'t
I ssued by:
Purchasing Agent
Da te Issued:
11-08-11
This Bid 9.Jbmittal Consists of
Pages 20 through 23
+ -- j
S3aled bids are subject to the Terms and Conditions of this Request for Qualifications and the
accompany ing Bid 9.Jbmittal. 9.Jch other contract prov isions, specifications, drawings or otiler data as are
attached or incorporated by reference in the Bid 9.Jbmittal, will be tBceived at the office of the City Clerk
at the address sho wn abo ve u nt i I th e abo ve stated ti me an d date, an d at that ti me, pub I ic Iy open ed fo r
fijm ishing the supplies or services described in the accompany ing Bid Submittal Requ irement.
RFQ 11-11-02
CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS
A Bid Deposit in the amount of !J.2k.ofthe total amount of the bid shall accompany all bids
A Performance Bond in the amount of 0% of tile total amount of the bid will be required upon execution
of the contract by the successful bidder and City of Sunny Isles Beach
Procurem ent Aaent:
Marcanthony Tulloch
Firm fII ame:
Corzo Castella Carballo Thompson Salman, PA
Commoditv Coders J:
RETURfII ONE ORIGINAL Afl/D FOUR COPIES OF BID SUBMITTAL PAGES AfIID AFFIDAVITS
FAILURE TO SIGN PAGE 23 OF SECTION 6 BID SUBMITTAL WILL RENDER YOUR BID NON-
RESPON SI VE
my of Sunny Isles Beach IRequest for Qualifications [\Jo. 11-11-02
63
'1
. .
SECTION 6
BID SUBMITTAL FOR:
ACK N OWLE DG EM ENT OF ADD E NDA
,
INSTRUCTIONS: COMPLETE PART lOR PART II,WHICHEVER APPLIES
PART I:
LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTIO~J
WIT H TH IS BID
-,
Addendum#1 Dated November 14,2011
,
Ad dendu m #2, Dated
Addendum#3, Dated
. J
Ad dendu m #4, Dated
Ad dendu m #5, Dated
Ad dendu m #6, Dated
Ad dendu m #7, Dated
Addendum #8, Dated
PART II:
o NO .ADDENDUM WAS RECEIVED IN COf\JNECTION WITH THIS BID
FIRM NAM E: Corzo Castella Carballo Thompson Salman, PA
DATE:
12-1-11
TITLE OF OFFICER: Founding Principal
Oty of Sunny Isles Beach IRequest for Qualifications [\Jo, 1l-1l-02
64
, 1
. I
1
BI D SU BMITT AI... FORM
Bid Titte: CIVIL ENG INEERING SERVICES TO DESIGN STREET AN D DRAINAGE
IMPROVEMEN TS
1
The undersigned Proposers proposes and agrees, if th is Bid is accepted, to enter into an agreement with
The City of 9.mny Isles Beach in the form included in the Contract Documents to perform and furnish all
Work as ~ecified or indicated in the Contract Documents for the Contract Price and within the Contract
Time ind icated in th is B id an d in acco rd ance with th e 0 th er ter ms and c ond ition s 0 f the Co ntr act
Docu ments.
The Proposers accepts all of the terms and conditions of the Advertiffiment or Request for Qualifications
and Instructions to Propoffirs, including without lim itation those dealing with the disposition of Bid
93curity, This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The
Proposers agrees to sign and :=ubmit the Agreement with the Bonds and other documents required by the
Bidding RequitBments within ten days after the date of the City's Notice of Award.
,""
In :=ubmitting this Bid, the Proposer represents, as more fully set fot-th in the Agreement, that:
~ J
· The Propo ser has fa m i liar ized h i mse If;h erse I f with the nature and ex ten t of the
Contract Documents, Work, site, locality, and all local conditions and Law and
Regulations that in any manner may affect cost, progress, performance, or
furnishing of tile Work.
· The Proposer has given tile City written notice of all conflicts, elTors,
discrepancies that it has discovered in the Contract Documents and the written
reso lut ion th ereo f by City is acceptab Ie to the Pm poser.
· This Bid is genu ine and not made in the intetBst of or on behalf of any
undisclosEd person, firm or corporation and is not submitted in conformity with
any agreement or ru les of an~1 group, association, organ ization, or corporation;
the Proposer has not directly or indirectly induced or 9Jlicited any other
Proposers to submit a false or sham Bid; the Proposer has not solicited or
induced any person, firm or corporation to refrain fro m B idd ing; and Proposer
has not sought b~1 collusion to obtain for itself any advantage over any other
Proposers or over the City,
The City and the successful Propoffir will establish completion times for each individual Work Item and
the successfiJ I Proposer agrees that the work wi II be comp leted within the time fi'ames agreed upon and
stipulated in tile individual Purchase Orders and/or f',Jotice to Pmceed.
oty of Sunny Isles Beach IRequest for Qualifications [\Jo. 11-11-02
65
.r 1
I
Firm Name:
< 1
I
Corzo Castella Carballo Thompson Salman, PA
Street Address:
901 Ponce de Leon Blvd, Suite 900
---------------------
Mailing Address (if different):
Coral Gables, Florida 33134
. 1
Tele hone No. 305-445-2900 Fax No, 305-445-3366
p --------- --------
k t. @ 3t 65-0039493
Email /.l.ddress:_mareln~s.com ___FEU\I 1\10. _J_----1_I_I---1_J---1_
-t l- l
,.. '~y signing this document the bidder agrees to all Terms
Print Name:
d agent)
Jorge E. Corzo, PE, CFM
. I Founding Principal
Tlte:____________
THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAl OFFER OF PROPOSER TO
BE BO UN D BY THE TERMS OF ITS PROPOSAl. F AILU RE TO SI G N THI S SOLI CIT All ON WHE RE
INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHAlL RENDER THE PROPOSAl
NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY
PROPOSAl THAT INCLUDES AN EXECUTED DOCUMEN T WHICH UNEQUIVOCAlLY BIN DS THE
PROPOSER TO THE TERMS OF ITS OFFER.
oty of Sunny Isles Beach IRequest for Qualifications No, 11-11-02
66