Loading...
HomeMy WebLinkAboutCraig A. Smith #1 1 1 , I 1 J t 1 I I I 1 1 ~ - , J ORIGINAL CIVIL ENGINEERING SERVICES TO DESIGN STREET &. DRAINAGE IMPROVEMENTS December 2, 2011 Craig A. Smith &. Associates, Inc. 7777 Glades Road, Suite 410 Boca Raton, FL 33434 (561) 314-4445 * Fax: (561) 314-4457 gschriner@craigasmith.com r 1 r 1 ~ 1 r 1 . 1 I I ' I t I I I 1 ' 1 . , 1 I I J I I CRAIG A. SMITH & ASSOCIATES 7777 Glades Road. Suite 410 . Boca Raton, Florida 33434 CONSULTING ENGINEERS . SURVEYORS . UTILITY LOCATORS . GRANT SPECIALISTS WWW.CRAIGASMITH.COM December 2, 2011 Ms. Jane A. Hines, City Clerk City of Sunny Isles Beach 18070 Collins Avenue, 4th Floor Sunny Isles Beach, FL 33160 RE: REQUEST FOR QUALIFICATIONS 11-11-02 CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS CAS PROPOSAL NO. 2770 Dear Ms. Hines: For your consideration, Craig A. Smith & Associates, Inc. (CAS) is pleased to submit this proposal in response to your Request for Qualifications for Civil Engineering Services to Design Street and Drainage Improvements along 174th Street. CAS is a local South Florida Consulting Engineering, Surveying and utility Locating firm that has been in business for over thirty '(30) years in South Florida with Corporate Headquarters located in Boca Raton. CAS, a client oriented firm, is capable of providing the City of Sunny Isles Beach (City) with the specialized, professional services and expertise in Stormwater Infrastructure and Roadway Improvements Design and Construction as specified in the RFQ.' CAS specializes in the design, mapping, permitting and construction of all types of underground stormwater piping, stormwater conveyance and treatment. CAS provides this similar service to your neighboring communities of Bal Harbour Village and the Town of Golden Beach. In addition to those services, CAS brings unique and exclusive Three Dimensional Radar Tomography (3D) underground mapping and utility locates capability that can save the City time and money during the design and construction of this project. This capability will allow the City to avoid costly mistakes, utility conflicts and disruptions to City residents, common to these types of projects, as the stormwater pipeline and improvements project get under construction. This technology will minimize disruption to businesses in the area. Our 3D technology also ensures CAS's commitment and ability to complete all projects on time and within budget without conflicts. CAS has all the specialized staff in-house to assist the City with the complete stormwater project in your RFQ. CAS is the only licensed provider of 3D technology through our wholly owned company MPS3D. With this technology, MPS3D has successfully provided these services for the White House Lawn in Washington D.C., Interstate 595 for FOOT and has successfully completed projects for NASA, THE U.S. Military and many other clients. MPS3D does more than locate underground utilities. Through bur 3D technology we can differentiate between metallic and non-metallic pipes, as well as identify other anomalies which may conflict with proposed construction activities, a capability unique to MPS3D/CAS. CAS has the specialized expertise to generate accurate above ground and below ground base maps for design of pipelines in a very timely and cost effective manner. This capability brings Value Added Radar Scanning providing project accuracy and limiting the City's liability during construction of the stormwater system. CAS is a Civil Engineering, Surveying, Utility Locating, Construction Management and Grant Specialist firm with over forty (40) local dedicated members of staff including seven (6) Registered Professional Engineers, three (3) Engineering Interns, two (2) Registered Professional Surveyors, four (4) Construction Managers and two (2) Grant Specialists, The balance of staff includes technical CADD drafting personnel, certified field inspectors, utility locators, as well as competent administrative, clerical and accounting personnel. Our professional staff is long tenured with the firm. We propose to provide all services in-house with no sub-consultants. CAS has extensive experience and specializes in providing Engineering Services for numerous small and medium sized Coastal Municipalities in Florida. CAS currently provides similar services to Bal Harbour 954.782.8222 - 561.791.9280 954.786.8927 561.314.4445 - 305.461.4410 561.791.9818 Phone F a x r 1 '1 , 1 r I '] 'I City of Sunny Isles Beach December 2, 2011 Page 2 of 2 Village as well as the Town of Golden Beach. We believe our successful experience with the unique needs of Southeast Florida Coastal Municipalities similar to the City of Sunny Isles Beach in size and character will benefit the City. We service the small projects with the same emphasis and commitment to quality as we do the many large projects we have done. CAS currently provides stormwater design services including General Consulting Services as Town Engineer, City Engineer, Village Engineer, District Engineer and County Engineer for the following local government agencies: Village of Bal Harbour (since 1987) Town of Golden Beach (since 2000) City of Moore Haven (since 1995) City of Sweetwater (since 2000) Glades County (since 1994) Okeechobee County (since 1990) Spring Lake Improvement District (since 2004) Town of Pembroke Park (since 1989) Village of EI Portal (since 2005) . J Most of the services performed for these government agencies are related to water and sewer utility projects, stormwater improvement projects and roadway improvement projects. Eighty (80%) percent of the projects performed have been funded through CAS grant assistance. We recently assisted the Town of Golden Beach in their securing of a Nine Million ($9,000,000)) Dollar HMGP grant for infrastructure renovations, the City of Sweetwater was awarded (October 2011) an additional Two Million Nine Hundred Thousand ($2,900,000) infrastructure grant, the Town of Pembroke Park was awarded (October 2011) a Nine Hundred Thousand ($900,000) infrastructure grant and the City of Moore Haven in their securing of One Million Nine Hundred Thousand ($1,900,000) Dollars for stormwater infrastructure improvements by completing and submitting their applications. Our relationships with the funding agencies, DERM and the South Florida Water Management District staff allow us to work together to assist in obtaining these types of grant funds. Grant assistance is a Value Added ability that CAS commits to providing the City should we be selected in the RFQ process. , I I , J j , , , , , , CAS President and Professional Engineer Gene R. Schriner's thirty (30) year history in South Florida including his vast experience with the types of projects outlined in the City's proposal will enable CAS to provide successful, timely and cost effective services to the City. Our 3D Radar enhances this ability. As President, Mr. Schriner commits the firm's professional, technical and financial resources to achieve the City's goals regarding time and budget. I I CAS currently is in the close-out stages of numerous projects for our clients and is in need of additional work for our staff of 40 which are local residents. We have the experienced staff available for the City's projects and commit the resources to this project. Our proximity to the City allows for expedient and superior service to the City. We are presently serving Golden Beach and Bal Harbour which provides cost savings. CAS is client oriented and not project driven. To ensure our success for our clients we commit and devote the staff, time and attention to fully understand the client's needs and desires, We put premium value on the opinions and input of the end users of our services, officials, staff and residents and strive to produce an end product that addresses their needs and expectations. We pride ourselves in establishing long-term relationships with our clients by providing them with the ultimate in successful Consulting Engineering Services. We invite and encourage you to contact our current clients and discuss the successful projects we have completed together. Sincerely, e R. Schriner, P.E. President 1 1 TABLE OF CONTENTS '1 SECTION DESCRIPTION PAGE r 1 I j 1 COMPANY INFORMATION 1-2 I '1 CERTIFICATE OF INSURANCE 3-4 I ! 2 QUALIFICATIONS 5-9 PROJECT PROFILES 10-30 3 STAFFING t I ORGANIZATION CHART 31 . RESUMES 32-56 . I , , 4 APPROACH I METHODOLOGY 57-62 . I 5 REFERENCES 63-68 6 OFFICE LOCATIONS 7 CONTRACT FORMS BID SUBMITTAL FORMS ACKNOWLEDGEMENT OF ADDENDA BID SUBMITTAL FORM NON-COLLUSION AFFIDAVIT PUBLIC ENTITY CRIMES EQUAL OPPORTUNITY I AFFIRMATIVE ACTION CONFLICT OF INTEREST DISPUTE DISCLOSURE ANTI-KICKBACK 8 SUPPLEMENTAL INFORMATION 69 70 71 72-73 74 75-76 77 78 79 80 81-89 CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 TOC , 1 1 1 I , I . 1 I 'I . j I I COMPANY INFORMATION Craig A. Smith and Associates, Inc. (CAS) is a Florida Corporation licensed for the practice of Professional Engineering, Surveying, Construction Management and Utility Locates Services. CAS has three office locations, with the home office/corporate headquarters located in Boca Raton. Palm Beach Office: Corporate Headquarters 7777 Glades Road Suite 410 Boca Raton, Florida 33434 (561) 314-4445 www.craigasmith.com Broward Office: 1000 West McNab Road Suite 114 Pompano Beach, Florida 33069 (954) 782-8222 Miami-Dade Office: 799 Brickell Plaza Suite 804 Miami, Florida 33131 (305) 940-4661 CAS was established in 1980. Since then, the firm expanded from its original, technical orientation in municipal engineering and surveying into a full service civil engineering practice with specialized expertise in Engineering, Surveying & Mapping, Grants/Loan Assistance, Construction Management, Utility Locates and CAD Design & Development. Size - CAS' professional, technical and administrative personnel numbering 30+ people represent professionals in the fields of civil engineering, water and wastewater engineering, storm water engineering, surveying, mechanical engineering, construction engineering, grant specialists, utility locating, computer sciences and finance. Organization - CAS is organized into five technical operating divisions each under the supervision of . a Vice President or Director. These operating divisions are: . Civil Engineering . CAD Capability . Subsurface Utility Locates . Surveying . Construction Management Philosophy - CAS is committed to providing its clients with cost-effective, timely, comprehensive, high-quality professional services in the practice of engineering, surveying, construction management, utility locating and grant/legislative services. This commitment to excellence is achieved through the development of a team spirit of service to clients. Litigation - CAS is not currently involved in any outstanding litigation that would threaten the viability of the firm or the performance of this contract. CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 1 I F 1 r 1 I , t I , . I I I COMPANY INFORMATION Availability - CAS is available to start immediately upon award and authorization from the City. CAS prides itself on our ability to tailor our services to meet our clients' needs. We are proud of our past history of successful design projects. This success is a result of our highly experienced staff members who have created a cohesive team ensuring projects are completed in a timely and cost effective manner. CAS is dedicated to execute the project schedule established at the beginning of the project. Most projects shall include a pre-design conference to establish the project contact with the City, regulating agency and CAS. From this meeting a detailed project schedule will be created, including a Schedule of Values. This will be updated through the project design/construction process. Design team updates will be provided on a regular basis as requested by the City to all involved with the project. Status of each milestone identified at the initial project "kick-off' meeting will be provided on a monthly basis with an updated project schedule, similar to the following example. CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 2 , ) .----., OP ID' WM I l' I ACORD" CERTIFICATE OF LIABILITY INSURANCE ,. DATE (MM/DDNYVY) \.-...----- . 04/06/11 I THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED. the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the polley, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorserrientls). ..... . . PRODUCER 561-391-4661 CONTACT NAME: Sena & Whitney CO~ Office 561-338-6551 rlJgN~o Exl',- I r.e~ Nol: Sena & Whitney, LL 190 Glades Rd Suite C E-MAIL ADDRESS: Boca Raton, FL 33432 ~~~g~~~ 10 #. CRAI2-C INSURERISI AFFORDING COVERAGE NAIC# INSURED Craig A. Smith & Associates; INSURER A: Endurance American Spec Ins Co MPS3D LLC, Craig A. Smith LLC INSURER B : Stephen McBride INSURER C : 7777 Glades Road Suite 410 Boca Raton, FL 33434 INSURER 0: INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: , ) r]' 'r . I THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OFANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AfFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. I~~: TYPE OF INSURANCE ADDL SUBR POLICY NUMBER I "pOLlC EFF ~~~6%YY~~1 LIMITS MM/DDIYYVY GENERAL LIABILITY EACH OCCURRENCE S I-- ~~~~~~~?E~~~6,E~ence\ - 3MERClAL GENERAL LIABILITY S - CLAIMS-MADE 0 OCCUR MED EXP (Any o'no person) S - PERSONAL & ADV INJURY S - GENERAL AGGREGATE S ~'L AGGRnE LIMIT APPLIES PER: PRODUCTS - COMPIOP AGG S POLICY ~~T n LOC $ AUTOMOBILE UABILITY COMBINED SINGLE LIMIT $ - (Ea accident) - ANY AUTO BODILY INJURY (Per person) $ I-- ALL OWNED AUTOS BODILY INJURY (Per accident) $ I-- SCHEDULED AUTOS PROPERTY DAMAGE HIRED AUTOS (Per accident) $ I-- I-- NON.OWNED AUTOS $ $ UMBRELLA L1AB H OCCUR EACH OCCURRENCE $ I-- EXCESS LIAB CLAIMS-MADE AGGREGATE $ - DEDUCTIBLE $ RETENTION $ $ WORKERS COMPENSATION I 'T~~~nJN;" I IOJ~. AND EMPLOYERS' LIABILITY Y/N ANY PROPRIETORIPARTNERlEXECUTIVE 0 E.L. EACH ACCIDENT $ OFFICER/MEM6ER EXCLUDED? NIA (Mandatory In NH) E.L DISEASE - EA EMPLOYEE $ If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ A E & 0 Architect & I PPL 10003081000 ,. 04/01111 04/01/12 Ea. Claim 1,000,060 Engineer i Aggregate 2,OOO,00( DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remark. Schedule.. Ir more space Is required) CERTIFICATE HOLDER CANCELLATION ~ ! r I ; - f SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. PROOF OF INSURANCE. AUTHORIZED REPRESENTATIVE I I uR.A,0~ @>1988-2009ACORD CORPORATION. All rights rBserved. ACORD 25 (2009/09) The ACORD name and logo are registered marks of ACORD Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 3 . ) r ) r I I I 1 r] I I ) I 1 . J " l . J -' , Client#. 13062 CRAIGASM .. I ACORD", CERTIFICATE OF LIABILITY INSURANCE DA!E (MMlDUfYYYV) . 12103f2010 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONf'ERS NO R!GHTS UPON THE CERTIF'C~TEHOLDER THIS CERTIFICATE DOES NOT AFFIRMA TIVEL Y OR NEGA lIVE:.L y' AMEND, EXTEND OR ALTER 'THE COVERAGE AFFORDED By'THE'POLiCIES , BELOW. :THIS CERTIFICATE OF INSUf{AN~E DOtS NOT CONSTITUTE A CONTRACT Bl:,TWEEN THE ISSUING INSURER(S), AUTHORiZED: .' REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER., IMPORT ANT: If the certificate holder is an ADDITIONAL INSURED, the poTicy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject 1<:. the terms and conditions of the policy, certain policies may require an endorsement. A statement on this ce.rtificate does n~'t confer rights to the, certificate holder In lieu of such endorsement(s). ~~r<; I Jeanne B. Bender. . =1 PRODUCER Cypress 'Insurance Group BO-CL ~..1l'~l\: 954 771-0300 --,-~ ~ r..ea. No): ~~ 772 94-2_C P.O. Drawer 9328 E-MAIL Fort Lauderdale, FL 33310.9328 ADDRI;SS: ._~ _ _. "._4_ ___ P!Rl"O'\JCER CUST.JMER ID #: ----..---..-. 954 771-Q300 INSURER(S) AFFOROtNG COV~~G_E__ _-1~!~~_ ---- "---'-'---'- .'--' INSUR!:O IUSURERA: Travelers Indemnity -1--0-' .~-- Craig A. Smith & Associates INSURER B : Ohio Casualty Insurance Company I PO Box 880128 INSURER c: Chartis j-'-- Boca Raton, FL 33488 I -- ~':I~URER D : "--- "- INSURER E : : -f---- INSURER F : I COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LlSTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ~~RI TYPEOFINSIJRANCE ~~L~~RI POLICY NUMBER rJ>Mg6~ 1~,Jjg~ I LIMITS A Rl' GENERALUABILlTY ! 660505M2249 112f01/2010I12/01f2011 EACH OCCURRENCE 51000000 ; I I ~~~'::,!v_t<"NI"u L COMMERCIAL GENERAL LIABILITY 'PREMISES (Ea oco.mencel 5300,000 U CLAIMS-MADE ~ OCCUR' I MED EXP (Anyone person) 55,000 U PERSONAL&ADVINJURY 51,000,000 . 1 I GENERAL AGGREGATE 52,000,000 ~N'L AGGREGATE LIMIT AP~S PER: I PRODUCTS - COMP/OP AGG s2,000,000 IpOLlCyn~~f,: IXILOC I i I IS B _AUTOMOBILEUABILITY II BA053319679 r2/01/2, 010 12101/2011 COMBINEDSINGLEUMIT (Ea accident) 51.000 000 - ANY AUTO BODILY INJURY (Per person) 5 _ ALL OWNED AUTOS BODILY INJURY (Per accident) 5 ._.! SCHEDULED AUTOS I.. PROPERTY DAMAGE I 5 ~~~ I ~~ I~I NON-OWNED AUTOS ,: I S XI Drive Other Car 'I 5 B _ UMBRELLA LJAB lxJ OCCUR I I EU054645021 '12101/2010112101/20111 EACH OCCURRENCE 154,000,000 X EXCESS UAB n CLAIMS-MADE I I I AGGREGATE s4.000 000 _ DEDUCTIBLE I I i s 1 X RETENTION 5 0 I I I I s C I WORKERS COMPENSATION I BINDER270599 112101/2010 'I 12101f20111 X If~RSY.\~~Yrs I I~~H-I . AND EMPLOYERS' lJAIijLlTY Y IN' ,-,-- ,-- ANY PROPRIETORlPARTNERlEXECUTlVEr;;lN I I E.L EACH ACCIOENT 151,000,000 I OFFICER/MEMBER EXCLUDED? L!!.I N1A ~ (Mandatory In NH) I l5:b D1SEAl:E - EA EMPL9Y~Ei 51,000,000 I ~~sc~~~~ O~OPEP..ATlONS below 1 l I I E.l. DISEASE. POliCY LIMIT 151,000,000 I I I _ II DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICle,S (A,;;ach ACORD 101. Additional Renwrks Schedule II more .pa<:e is required) Workers Compensation applies to Florida operations and employees only. -- -- I 1 (ERTIFfCA TE HOLqER I Proof of Insurance CANCELLATION ----r ..----.. ..._-"-'--, l:mOlJLD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELi ED BEFC:RE THE EXPIRATION DATE THEREOF. NOTICE WILL BE DELlVERl'D IN ACCORDANCE WITH THE POLICY PROVISIONS. - I=':~~ .--] @ 1988-2009 ACORD CORPORATION. All righis l'eserved. The ACORD nclme and logo are registered marks of ACORD ACORD 25 (2009/09) " of 1 #S102237fM102203 Proposer: Craig A. Smith & Associates JBB RFQ No. 11-11-02 4 '1 · 1 I qUAUFICATIONS , 1 I i I RELEVANT EXPERIENCE . Golden Beach Stormwater Improvements Ongoing Contact: Alexander Diaz, Town Manager, Town of Golden Beach Design and permitting of a stormwater retrofit project ($6.0M). Prepared cost estimate, bid schedule, provided bidding assistance and FEMA grant application documentation. . Stormwater Master Plan and Construction Plans Contact: Alexander Diaz, Town Manager, Town of Golden Beach Prepare a six-phase stormwater master plan and construction plans. Ongoing . Stormwater Master Plan and Construction Plans Ongoing Contact: Todd Larson, Public Works Director, Town of Pembroke Park The primary objective of the study was to compile a comprehensive stormwater master plan for the entire Town of Pembroke Park to identify and detmine corrective actions required to resolve existing flooding conditions through best management practices in the development of new and retrofitted stormwater systems. I I. . . Stormwater Master Plan and Construction Plans Contact: Manuel Marono, Mayor, City of Sweetwater Prepare a six-phase stormwater master plan and construction plans. Ongoing . I . Phase IV Stormwater Improvements Ongoing Contact: Manuel Marono, Mayor, City of Sweetwater Design and permitting of stormwater retrofit project ($3.8M). Preparation of construction plans, bid schedule, cost estimate, bidding assistance and engineering services for the ongoing construction. . Phase III & IV of the Stormwater Collection System and Pump Station Master Ongoing Plan & Design Contact: Alexander Diaz, Town Manager, Town of Golden Beach A pumped stormwater collection, treatment and disposal system to serve a portion of the Town of Golden Beach. Phase III & IV pump station design, two (2) submersible pumps each 12 CFS. . Southwest Drainage Improvements 2011 Contact: Jim Threewits, Deputy Administrator, Okeechobee County Design, permitting, preparation of construction plans, bidding and construction management of a $2.0M stormwater treatment and collection system for the southwest area of Okeechobee County. Assisted County with securing grant and prepared benefit to cost analysis for FEMA HMMGD grant for project. . Stormwater Master Plan 2009 Contact: Jim Threewits, Deputy Administrator, Okeechobee County Stormwater evaluation and master planning study. . Ranch Lakes Estates Stormwater Improvements, Phase I 2009 CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 5 '] 1 '1 I I I 1 '1 , 1 I 1 I r ~ ~ 1 . J . 1 QUAUFICATIONS Contact: Bret Whidden, Mayor, City of Moore Haven Design, permit and construction of gravity collection system, retention pond and pump station. Construction of master stormwater pump station to Calossahatchee River. . Phase II of the Stormwater Master Plan 2007 Contact: Alexander Diaz, Town Manager, Town of Golden Beach A pumped stormwater collection, treatment and disposal system to serve a portioin of the Town of Golden Beach. . Stormwater Improvements & Pump Station Phase I, II, III 2007 Contact: Manuel Marono, Mayor, City of Sweetwater Installation of gravity stormwater collection system, pump stations and force main distribution system to C-04 canal. Phase I included two pump stations each 20 CFS. Phase III included two pump stations each 40 CFS. . 1-95 Pump Station 2006 Contact: Robert Levy, Town Administrator, Town of Pembroke Park FDOT Corridor Drainage Project, 1-95/Pembroke Park Road. Project includes 84" drainage pipes; micro-tunneling; pump station with four (4) pumps (200 HP motors) each capable of 40 CFS; ditch construction and C-tO canal dredging. This project was a fast track from preliminary design to construction; completion took only 25 months. . Stormwater Master Plan Update 2006 Contact: Alexander Diaz, Town Manager, Town of Golden Beach The intent of the project was to utilize and enhance an existing master plan. The updated master plan incorporated existing stormwater facilities with a conceptual design in order to achieve a comprehensive system that would improve the Town's flood protection. Due to the existing conditions with the Town (i.e., tidal influences and low topography) stormwater pump stations and water quality structures were implemented in order to address the water quantity and quality of runoff prior to discharge. . Stormwater Master Plan Evaluation 2005 Contact: John Lavisky, Interim City Administrator, City of Lighthouse Point The primary objective of the study was to compile a comprehensive stormwater plan for the entire City of Lighthouse Point and to identify and determine corrective actions required to resolve existing flooding conditions through best management practices in the development of new and retrofitted stormwater systems, while addressing water quality and water quantity concerns. CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 6 '1 , 1 I , 1 I I 1 I · I I.. i l . 1 . j QUAUFICATIONS . Stormwater Pump Station NO.4 2005 Contact: Paul Callsen, Director of Public Works, City of Sunrise Two natural gas engine drive stormwater pumps at 90 CFS each including the building. . Stormwater Pump Station - West, Central & East Renovation 2004 Contact: Alan Lam, Project Manager, City of Tamarac Construction of three (3) master stormwater pump stations including building, landscaping, and backup power with capabilities ranging from 80 CFS to 240 CFS each pump station. . Stormwater Master Plan 2003 Contact: Jason Walker, Village Manager, Village of EI Portal The primary objective of the project was to develop a comprehensive stormwater master plan for the Village of EI Portal. The plan identified and determined cost effective conceptual solutions to resolve existing flooding conditions through best management practices in the development of a new and retrofitted stormwater system while addressing water quality and water quantity concerns. . Stormwater Master Plan 2002 Contact: Robert Levy, Town Administrator, Town Pembroke Park The primary objective of the study was to compile a comprehensive stormwater master plan for the entire Town of Pembroke Park and to identify and determine corrective actions required to resolve existing flooding conditions through best management practices in the development of new and retrofitted stormwater system. CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 7 '1 1 , 1 , 1 I '~ I I ' I I I · i I' I I . . I QUAUFICATIONS WHY CAS? Stormwater infrastructure improvements and retrofits in urban (highly developed and aged) areas with high density and commercial zoning require detailed and intensive underground investigation and mapping prior to design. It is critical to accurately map/survey the above ground right-of-way and underground right-of-way conditions to cost effectively design stormwater conveyance, treatment, retention and discharge piping. This is the first and most critical step for a successful timely project. This is a proven fact in the underground construction industry. Cities too often begin design and construction without sufficient underground data, leading to change orders, cost overruns and delays. CAS has been in the engineering and surveying business since 1980 (over 30 years) involved with the design and construction of stormwater systems both new and replacements (retrofits). Over the 30 years, we have witnessed proof that South Florida city right-of-ways have been "used-up" and "cluttered" with many utilities, including communications, telephone, internet cabling, fiber optics, water, sewer, gas and electric to name a few. This accumulation of underground facilities often are not accurately "as-built", marked or recorded and prior to beginning underground construction, it is imperative that full and accurate locations of facilities are required for a successful project. Without this information, the City would be exposed to potential construction delays, change orders, design changes and project cost overruns. CAS's experience in the design of underground stormwater conveyance, treatment and water and sewer utilities for over 30 years in South Florida have driven the firm to develop and operate a utility locating division in-house due to past delays and inaccuracy from outsourcing this service to subcontractors. We started this division in 2001 due to the increasing clutter underground within right-of-ways and to better serve our clients. CAS also owns and operates the onlv operating 3D scanning equipment in the South Florida. We purchased a license to operate this equipment to more accurately locate underground facilities. This commitment to professionalism in underground mapping and surveying (SUE - Subsurface Underground Engineering) sets us apart from other firms that design underground facilities such as stormwater conveyance and utilities. CAS is the best qualified for this project due to: . In-house SUE and 3D Radar Scanning; guaranteed accuracy with one firm. . 30 years of experience in stormwater design and construction management in South Florida. . Knowledge of the Sunny Isles area due to our work in both neighboring communities of Bal Harbour Village and Town of Golden Beach. . CAS has the experienced staff available NOW and commits to an accelerated schedule through completion. CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 8 1 , 1 I 1 I . I I I ; 1 I J 1 I J I . I I .' I i 1 I I I I QUAUFICATIONS PROPOSED SERVICES TASK 1. DESCRIPTION EST. SCHEDULE Preliminary Plan of Project 0.5 month 2. Meetings with City for Approval 3. Above Ground Route Survey 1 month 4. Underground Survey SUE Utility Locating by 3D Radar Scanning 1.5 months (performed concurrently with #3) 5. Develop Base Maps for Design 1 month 6. Preliminary Engineering Design 1.5 months (concurrent with #5) 7. Approval Meeting with City 8. Final Design and Construction Plans, Contract Documents And Specifications 2 months 9. Permitting (performed concurrently with #5-8) 4 months Estimated Time for Design 6 months 10. . 1.5 months Bidding 11. 0.5 month Project Award 12. 9 months Construction Management CAS commits to having continuous meetings with the City Staff and to provide scheduled deliverables. CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 9 ~ 1 ~ 1 Vr-()ject Vr-()files r 1 I , 1 J r 1 I .' 1 , , I . I ~ " PROJECT NAME: STORMWATER PUMP STATION West, Central and East Renovation City of Tamarac 6601 Nob Hill Road Tamarac, FL 33321 Alan Lam (954) 597-3500 PROJECT DESCRIPTION: Construction of three (3) master stormwater pump stations including building, landscaping and backup power with capabilities ranging from 80 CFS to 240 CFS each pump station PROJECT ENTITY: CONTACT NAME/NO.: RESPONSIBILITIES: Planning, design, permitting, bidding and con- struction management services. COST: $4,832,000 Complete-West & Central-10105 Complete East-08/06 cT-=, Craig A. Smith & Associates ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANTS ASSISTANCE Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 ADM INfPROPOSALSfPROJECTPROFILESf02<1 0 'I I ') J 1 Vr-uject Vr-()files I I I . I 1 I . J ~ ! . J , 1 . J PROJECT NAME: STORMWATER PUMP STATION NO.8 PROJECT ENTITY: City of Sunrise 10770 W. Oakland Park Boulevard Sunrise, FL 33351 CONTACT NAME/NO.: Paul Callsen, Director of Public Works (954) 572-2385 PROJECT DESCRIPTION: Stormwater pump station with four (4) 110 CFS diesel hydraulic pumps including building. RESPONSIBILITIES: Planning, surveying, design, permitting, bidding, construction management and construction observation services. e Craig A. Smith & Associates ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANTS ASSISTANCE GRANTSJOPR, OP_OSALS_ IPROJECTPROFILES/SUNRISE-STRMW A TR8-PP02-0024.PUB11 Proposer: Craig A. Smith & Associates KI-U NI 11"11-U<! '1 r 1 r 1 . I V~()ject V~()files r 1 . J r 1 I J . J PROJECT NAME: STORMWATER PUMP STATION PROJECT ENTITY: Village of Bal Harbour 655 96th Street Bal Harbour, FL 33154 CONTACT NAME/NO.: Alfred Treppeda, Village Manager (305) 866-4633 PROJECT DESCRIPTION: Major stormwater pump station with two (2) 90 CFS pumps and eight (8) 24 inch injection wells. RESPONSIBILITIES: Planning, design, permitting, bidding, construction management and construction observation services. Construction completed in less than one year. CONSTRUCTION FEE: $2,000,000 ~ Craig A. Smith & Associates ~ ENGINEERS, SURVEYORS. UTILITY LOCATORS, GRANT SPECIALIST Proposer: Craig A. Smith & Associates GRANTS/PROPOSALS/PROJECTPROFILES/BALHARBOUR -STRMW A TRPP02-0025 .PUB RFQ No. 11-11-02 12 r1 , 1 r 1 I 1 V~()ject V~()files r \ I I r , I J I ' I ~ I 1 . I PROJECT NAME: STORMWATER PUMP STATION NO.1 PROJECT ENTITY: City of Sunrise 10770 W. Oakland Park Boulevard Sunrise, FL 33351 CONTACT NAME/NO.: Paul Callsen, Director of Public Works (954) 572-2385 PROJECT DESCRIPTION: Two stormwater pumps at 50 CFS each. RESPONSIBILITIES: Planning, surveying, design, permitting, bidding, construction management and construction observation services. ~ Craig A. Smith & Associates ~ ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANTS ASSISTANCE Proposer: Craig A. Smith & Associates G'Rt1tf14b~qlJ?1~f:b2'PROJECTPROFILES/SUNRISE-STRMW A TR I-PP02-0026.PUB13 r 1 1 r 1 , 1 Vr-()ject Vr-()files " . I I I I . t , 1 I , I I I I I 1 I 1 I . I I 1 , I I I J I I " PROJECT NAME: PROJECT ENTITY: STORMWATER PUMP STATION NO.4 City of Sunrise 10770 W. Oakland Park Boulevard Sunrise, FL 33351 Paul Callsen, Director of Public Works (954) 572-2385 Two natural gas engine drive stormwater pumps at 90 CFS each including the building. CONTACT NAME/NO.: PROJECT DESCRIPTION: RESPONSIBILITIES: Planning, design, permitting, bidding, construc- tion management and construction observation services. PROJECT INITIATION: PROJECT COMPLETION: 1995 1997 ~ Craig A. Smith & Associates CONSULTING ENGINEERS. PLANNERS. SURVEYORS. GRANTS ASSISTANCE Proposer: Craig A. Smith & Associates G'kfdtf~tf.qq9Pf-WPROJECTPROFILES/SUNRISE-STRMW A TR 4-PP02-0027,PU~4 , 1 I ) r 1 Vr-()ject Vr-()files PROJECT NAME: 1-95 PUMP STATION PROJECT ENTITY: Town of Pembroke Park - Hallandale, FOOT 3150 S.W. 52 Avenue Pembroke Park, FL 33023 , 1 CONTACT NAME/NO: Dr. Robert Levy, Town Administrator (954) 966-4600 PROJECT DESCRIPTION: FDOT Corridor Drainage Project, 1-95 / Pembroke Park Road. Project includes 84-inch drainage pipes; micro- tunneling; pump station with four (4) pumps (200 HP mo- tors) each capable of 40 CFS; ditch construction and C-10 canal dredging. This project was on a fast track from pre- liminary design to construction; completion took only 25 months. RESPONSIBILITIES: Planning, design, permitting, bidding, construction man- agement and construction observation services. TOTAL BID PRICE: $10,976,931.00 PROJECT INITIATION: October 2000-start of Preliminary Design PROJECT COMPLETION: November 2002 - Construction completion ~ Craig A. Smith & Associates ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANT SPECIALISTS Proposer: Craig A. Smith & Associates RFQ No. 11_11_@MIN/PROJECTPROFILES/I-95 PUMP ST A TION-pp02-028.PU~ 5 ~ J 1 . ) I Vr-uject Vr-()files r I I I . 1 I , I I I , 1 1 1 , I PROJECT NAME: PROJECT ENTITY: PHASE II OF THE STORMWA TER MASTER PLAN , I Town of Golden Beach One Golden Beach Drive Golden Beach, FL 33160-2296 CONTACT NAME/NO: Alexander Diaz (305) 932-0744 PROJECT DESCRIPTION: A pumped stormwater collection, treatment and disposal system to serve a portion of the Town of Golden Beach. RESPONSIBILITIES: Re-evaluation, design, permitting and construc- tion services for Phase II of a seven (7) phase Stormwater Master Plan. ESTIMATED CONSTRUCTION PRICE: $1,400,000.00 PROJECT COMPLETION: Project currently under construction ~ Craig A. Smith & Associates ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANT SPECIALISTS Proposer: Craig A. Smith & Associates RF Q No~9rr!lf'1{~6PpOSALSIPROJECTPROFILES/GO LDENBEACH -pp02-029 .PUB, 6 '1 r 1 I V~()ject V~()files r ] 1 r 1 I LE<lam @ _.~_._~_. lBlD =..::.==--=.-= - --.---- -- _...~_..._- --_...........~-- EXHIBIT V POTENTIAL STORM WATER IMPROVEMENTS KEY ~AP UNINCO.RPOAATEO BROWARO COUNTY -_.<>~ , 1 , 1 I . ~=- -~-iiiLLSBORO-;jEA-a~~~~~~-.-=_.___ ATLANTIC OCEAN -''''~~-~------..._ -..---- CRAIG A. SMITH & ASaOCtATES ooSt:-~==-=--:.c;..e;. , I , 1 PROJECT NAME: STORMWATER MASTER PLAN EVALUATION PROJECT ENTITY: PROJECT DESCRIPTION: City of Lighthouse Point 2200 N.E. 38 Street Lighthouse Point, FL 33064 John D. Lavisky, Interim City Administrator (954) 943-7750 or (954) 942-6500 The primary objective of the study is to compile a comprehensive stormwater plan for the entire City of Lighthouse Point and to identify and determine corrective actions required to resolve existing flooding conditions through best management practices in the development of new and retrofitted stormwater systems, while addressing water quality and water quantity concerns. CONTACT NAME/NO: RESPONSIBILITIES: PROJECT INITIATION & COMPLETION: Design Study December 2002- December 2003 ~ Craig A. Smith & Associates ~ ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANTS ASSISTANCE F I VfJV""". v, al~ n. vi""" '" n.,.,v",a,,,,., '" "l ",v. " ""v,," 17 ADMIN/PROJECTPROFILES/LIG HTHOUSE POINT --pp02-030. PUB '1 r 1 I J r 1 V("()ject V("()files , 1 I I 1 . 1 PROJECT NAME: CAROLINA STREET & PARK ROAD STORMWATER PUMP STATION PROJECT ENTITY: Town of Pembroke Park 3150 S.W. 52 Avenue Pembroke Park, FL 33023 CONTACT NAME/NO: Dr. Robert Levy, Town Administrator (954) 966-4600 PROJECT DESCRIPTION: The construction of a Stormwater pump station and the installation of stormwater drainage including catch basins, junction boxes, and stormwater force main. RESPONSIBILITIES: Planning, design, permitting, bidding, construction management and construction observation services. TOTAL BID PRICE: $2,172,000.00 PROJECT INITIATION APRIL 2003 PROJECT COMPLETION: FEBRUARY 2004 ~ Craig A. Smith & Associates ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANT SPECIALISTS Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 ADMINfPROJECTPROFILESfCAROLINA--pp02-03 I ,PUBj 8 '1 '1 I [)~()ject [)~()files , 1 I . . , , , 1 . 1 . . PROJECT NAME: PARK ROAD & SW 24TH STREET PUMP STATION , I PROJECT ENTITY: Town of Pembroke Park 3150 S.W. 52nd Avenue Pembroke Park, FL 33023 CONTACT NAME/NO.: Dr. Robert Levy, Town Administrator (954) 966-4600 PROJECT DESCRIPTION: Construction of a 10 CFS stormwater pump station tying 4 (four) lakes together including catch basins, junction boxes, and stormwater force mains. RESPONSIBILITIES: Planning, design, permitting, bidding and construction management services. TOTAL BID PRICE: $689,000.00 PROJECT INITIATION: August 2000 PROJECT COMPLETION: May 2001 ~ Craig A. Smith & Associates ~ ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANT SPECIALISTS Proposer: Craig A. Smith & AssociatesADMIW~Eft{Jg~t't~~~ECTPROFILES/P ARKROAD&24STREETPUMPST A TION-pp02"19 , 1 f 1 Vr-()ject Vr-()files , I , 1 I , , 1 PROJECT NAME: PROJECT ENTITY: PARK ROAD & SW 25TH STREET PUMP STATION CONTACT NAME/NO.: Town of Pembroke Park 3150 SW 52 Avenue Pembroke Park, FL 33023 Dr. Robert Levy, Town Administrator (954) 966-4600 PROJECT DESCRIPTION: Community Development Block Grant (CDBG) Project. Construction of a 5 CFS Stormwater pump station, including catch basins, junction boxes, pump valve box and stormwater force main. RESPONSIBILITIES: Planning, design, permitting, bidding, construction management and construction observation services. TOTAL BID PRICE: $188,300.00 PROJECT INITIATION: June 2002 PROJECT COMPLETION: August 2002 ~ Craig A. Smith & Associates ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANTS SPECIALISTS P C . A S 'lh & A . t ADMIW~R.O.P.OS,4,'rS1P.RruECTPROFILES/P ARKROAD&25STREETPUMPST A TION-pp02."O roposer: ralg . mJ ssocla es RrcrNO. T -IT-V.l .<. , 1 '1 '1 ~ I , 1 V~f)ject V~()files . 1 I 1 . I I I I . 1 PROJECT NAME: KIMBERLY LAKE BASIN DRAINAGE PROJECT ENTITY: City of Oakland Park 250 N.E. 33 Street Oakland Park, FL 33334 I I . I CONTACT NAME/NO.: David Womacks, Director of Public Works (954) 561-6280 . I PROJECT DESCRIPTION: The Kimberly Lake area is a private lake surrounded by a multi-family residential development. This pro- ject is to define the contributing basin area, prepare preliminary engineering plans, and to perform pre- liminary drainage analysis and cost estimates for several alternative solutions. RESPONSIBILITIES: Provide engineering and surveying services to pre- pare preliminary engineering design analysis and cost estimate for the project. TOTAL BID PRICE: $25,400.00 PROJECT TIME LIMIT: 12 weeks from execution of the work authorization. PROJECT INITIATION: December 2001 PROJECT COMPLETION: February 2002 Q Craig A. Smith & Associates ENGINEERS. SURVEORS. UTILITY LOCATORS. GRANTS SPECIALISTS Proposer: Craig A. Smith & Associates RFQ No. 11-Ai!nQm/PROJECTPROFILES/KIMBERL YLAKESTUDY -pp02-04 I .pug 1 r 1 r 1 '1 ~ ) Vr-()ject Vr-()files r 1 I 1 J r 1 I J I 1 . J , I PROJECT NAME: STORMWATER IMPROVEMENT & PUMP STATION PHASES I, II, III CITY OF SWEETWATER 500 SW 1 09th Ave Sweetwater, FL 33174 PROJECT ENTITY: CONTACT NAME/NO.: Mayor Manuel Morono (305) 221-0411 PROJECT DESCRIPTION: Installing Gravity Stormwater collection system, Pump stations and Force Main Distribution system. RESPONSIBILITIES: Planning, design, permitting, bidding, construction management and full time resident construction ob- servation services. TOTAL BID PRICE: PROJECT INITIATION: $13,471,797.00 October 2002 PROJECT COMPLETION: Phase 1 - 2003; Phase 3 - 2004 Phase 2 - under construction e Craig A. Smith & Associates ENGINEERS. SURVEORS. UTILITY LOCATORS. GRANTS SPECIALISTS Proposer: Craig A. Smith & Associates RFQ No. 11_11_t~MIN/PROJECTPROFILES/SWEETWATERI-II-III-pp02-042.PU~2 "1 , 1 r 1 V~()ject V~()files ...... . ---- II ---- .- ~ouw.ooo '1 J t I' I t I I i I I f . I 'c I I j CftNO A. twrH &AIIOCIAtU ~-S-;;=-QIi, . I PROJECT NAME: STORMWA TER MASTER PLAN l J PROJECT ENTITY: Town of Pembroke Park 3150 S.W. 52nd Avenue Pembroke Park, Florida 33023 CONTACT NAME/NO: Dr. Robert Levy, Town Administrator (954) 966-4600 I . . I PROJECT DESCRIPTION: The primary objective of the study was to com- pile a comprehensive stormwater master plan for the entire City of Pembroke Park and to identify and determine corrective actions required to re- solve existing flooding conditions through best management practices in the development of new and retrofitted stormwater systems. RESPONSIBILITIES: Stormwater master plan development PROJECT COMPLETION: Design-July 2001 ~ Craig A. Smith & Associates ~ ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANT SPECIALISTS Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 ADMIN/PROPOSALS/PROJECTPROFILES23 '1 . } '} V~()ject V~()files . 1 I I ;~:)J r 1 I , J WlIJlll . ...--- II ..--- . ---- II ..--- . -- '1 I , 1 1 I J . , i , I , 1 CfWl3 It.. IYlTH I.AIIOCIATU ~~C'F.o I . PROJECT NAME: PROJECT ENTITY: STORMWATER MASTER PLAN . I City of Oakland Park 250 N.E. 33d Street Oakland Park, Florida . . CONTACT NAME/NO.: David Womacks, Director of Public Works (954) 561-6280 PROJECT DESCRIPTION: Stormwater Evaluation and Master Planning Study RESPONSIBILITIES: Conceptual Stormwater Master Plan - Conceptu- ally place and size stormwater conveyance and exfiltration systems for entire City. Preparation of estimated construction costs. ~ Craig A. Smith & Associates ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANTS SPECIALISTS Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 ADMIN/PROPOSALS/PROJECTPROFILES/0524 , 1 r 1 r 1 Vr-()ject Vr-()files , 1 1 ' ! I . I PROJECT NAME: PROJECT ENTITY: STORMWATER MASTER PLAN Village of EI Portal 500 NE 87th Street EI Portal, Florida 33138 CONTACT NAME/NO.: Jason Walker, Village Manager (305) 795-7880 I I PROJECT DESCRIPTION: The primary objective of the project was to de- velop a comprehensive stormwater master plan for the Village of EI Portal. The plan identified and determined cost effective conceptual solutions to resolve existing flooding conditions through best management practices in the development of a new and retrofitted stormwater system while ad- dressing water quality and water quantity con- cerns. RESPONSIBILITIES: Stormwater Master Plan Development ~ Craig A. Smith & Associates CONSULTING ENGINEERS. PLANNERS. SURVEYORS. GRANTS SPECIALISTS Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 ADM [N/PROPOSALS/PROJECTPROFILES/058e[port~5 '1 r 1 Vr-uject Vr-()file~ r 1 . 1 I · 1 I I I r 1 I J I r 1 I t I MASTER PLAN EXERPT 'tOWN ........ -...at eottaPNM........ .....,.,... MAN ---- . I DESIGN PLAN EXCERPT f 1 " 1 PROJECT NAME: PROJECT ENTITY: STORMWATER MASTER PLAN UPDATE CONTACT NAME/NO: Town of Golden Beach One Golden Beach Drive Golden Beach, Florida 33160-2296 Alexander Diaz, Town Manager (305) 932-0744 PROJECT DESCRIPTION: The intent of the project was to utilize and enhance an existing master plan. The updated master plan incorporated existing stormwater facilities with a conceptual design in order to achieve a comprehensive system that would improve the Town's flood protection. Due to the existing con- ditions within the Town (i.e., tidal influences and low topography) storm- water pumps stations and water quality structures were implemented in order to address the water quantity and quality of runoff prior to dis- charge. PROJECT INITIATION: PROJECT COMPLETION: FALL 2001 SPRING 2003 ~ Craig A. Smith & Associates ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANTS ASSISTANCE PP02-00 Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 ADMIN/PROPOSALS/PROJECTPROFILES/05526 r 1 r 1 '1 Vr-()ject Vr-()files r 1 I , I I I J ! I J I I I 1 'J . J BEFORE AFTER PROJECT NAME: NE 40TH CT (NE 6TH AVE TO DIXIE HWY) STORM- WATER IMPROVEMENTS PROJECT ENTITY: City of Oakland Park 250 NE 33rd Street Oakland Park, FI 33334 Dave Womacks, Director (954) 561-6280 CONTACT NAME/NO.: . I PROJECT DESCRIPTION: Installation of drainage improvements on NE 40th Ct between 6th and 10th Avenues. Drainage improve- ment to consist of exfiltration trenches and full size catch basins with tie-ins (overflow lines) to the NE 6th Ave system with interconnects to the drainage systems recently installed along NE 42 Street to the North. Road to be repaved after drainage installation. RESPONSIBILITIES: Design, Bidding, Engineering Services and Construc- tion Services ~ Craig A. Smith & Associates ~ CONSULTING ENGINEERS. PLANNERS. SURVEYORS. GRANTS SPECIALISTS Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 ADM INIPROPOSALS/PROJECTPROFILESJ,7 No. 06f , 1 , 1 '1 , ] I)("()ject I)("()files I 1 I . ..__....~:~-!:!;~: llO " . i ~ Iir--- j I ! MASTER PLAN EXCERPT . 1 I 1 I . I I I DESIGN PLAN EXCERPT .L tI~. f~ ..'..;. .t\;.;i:.i. :;>' ..- ." ,..~.\ rEJ 1 . 1 , I , I :: ~ [. L-~:~ "1=:::::::1 ~ c4--='~==c-. C<Tv....~..AAK ~~ . t PROJECT NAME: CENTRAL PROSPECT BUSINESS DISTRICT DRAINAGE PROJECT ENTITY: City of Oakland Park 250 NE 33rd Street Oakland Park, FL 33334 CONTACT NAME/NO.: Dave Womacks, Director (954) 561-6280 . I PROJECT DESCRIPTION: Drainage Improvements in the Central Prospect Business District Area. RESPONSIBILITIES: Design, Permitting, Bidding, Contract Manage- ment ~ Craig A. Smith & Associates CONSULTING ENGINEERS. PLANNERS. SURVEYORS. GRANTS SPECIALISTS proposer: Gralg A. ~mlth & ASSOCiates KI-U NO. ll-ll-UZ za 64-04-1266 '1 '1 r 1 r 1 Vr-uject Vr-ufiles r 1 J . 1 I , I . I PROJECT NAME: STORMWATER IMPROVEMENT & PUMP STATION PHASES I, II, III PROJECT ENTITY: CITY OF SWEETWATER 500 SW 1 09th Ave Sweetwater, FL 33174 Mayor Manuel Marono (305) 221-0411 CONTACT NAME/NO.: PROJECT DESCRIPTION: Installing Gravity Stormwater collection system, Pump stations and Force Main Distribution system to C-4 Canal. Phase I two pump stations each 20 CFS. Phase III two pump stations each 40 CFS. RESPONSIBILITIES: Planning, design, permitting, bidding, construction management and full time resident construction ob- servation services. CONSTRUCTION COST: Phase I - $2,170,000 Phase III - $4,270,000 Q Craig A. Smith & Associates ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANTS SPECIALISTS Proposer: Craig A. Smith & Associates RFQ No. 11_11_6:PMIN/PROJECTPROFILES/SWEETW A TERI-II-III-pp02-069PUB.29 'I 1 '1 I Vr-()ject Vr-()files '] , 1 ; I J 1 1 PROJECT NAME: PHASE III AND IV OF THE STORMWATER COLLECTION SYSTEM AND PUMP STATION MASTER PLAN AND DESIGN , I , , . I PROJECT ENTITY: Town of Golden Beach One Golden Beach Drive Golden Beach, FL 33160-2296 , , CONTACT NAME/NO: Alexander Diaz, Town Manager (305) 932-0744 PROJECT DESCRIPTION: A pumped stormwater collection, treatment and disposal system to serve a portion of the Town of Golden Beach. Phase III & IV pump station design, two (2) submersible pumps each 12 CFS RESPONSIBILITIES: Re-evaluation, design, permitting and construction services for Phase III and IV of a six (6) phase Stormwater Master Plan. TOTAL PRICE: Phase III & IV-$2,031,000 PROJECT INITIATION: Design-October 2000 PROJECT COMPLETION: Currently under construction e Craig A. Smith & Associates ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANT SPECIALISTS Proposer: Craig A. Smith & Associates ADMIN/PROPOSALS/PROJECTPROFILES/GOLDENBEACH -pp02-070.PUB30 RFQ No. 11-11-02 '1 '1 '- '- ~- tn 0 0 ~.~ w VI VI Cl ~ '" - ~ .... .~ '~ ~~~ , 1 w VI c Q) -Q) ~ l...':S w-' .!!! QI 0. (50. g{l~ (/) O:u.i U N ~ I Uo "''C g{Vl u ~ .~ ~ \0' I- Zo:: ~o: 0 It .- .!!! Vl ~ QI VI o VI '- C j! ",,!;!l (/) ~... .... ..,~ -lO1 00 .1i; c:s .... .. cO ;:)z .- QI ~ CIa.. ~~ ::::::'~~ .... E c .!!1<t= C.'SCl , 1 ....I Ino QI QI E U 1IJ1IJUj Inu In~ J-I ... u <(0 ~.3 t:: ID Yl' <C .~ .... ~'- Vl Cl<>:..2j <C~ UU J-I > ~ ~ 1IJ"(3 .... c~ ~ ." s Cl U ~~ ;:) :0 :0 15\1:>" QI C :J :J <:::1:5 .1 w toot<C ~~ 0: -';:) c.o a. ~O' QI..., (/) 0' tii I ~ ,~ I l- I I z 'tj Z J-I El 0::: l.ij ~ w ld' I w ~ I .c z ... ~ . 1 ~ J-I QI .... .... .... :s; I W W W w e <:: I U ~ QI .W w w I a..c wc .C c ~.!;!l * RJ Z 0'61 o.:'g> U-!'6> ro '6> .... ",ill w o..c ~&i w '()Cl t ._ C vl'W ,w ...... en (/) CU 0::: .cw '5 en Cen ..... en wro <::~ :::I C C C W C ~.~ ,c .~:;: ~ w C::CI CO'V) 5 :!2i o ro ill" CO ; -' .- ro.- ~::E ~ ci'~ .(: ~(: 0~ C\~ 0 :!:w .w 10~ .~~ Eg. <(0. en 0. ~ 00 .... ::J ~ ::J u.~ U) . . 'C... roVl WVl -0 ~~ W l..9~ <(.... W ~ c 0 :'=1- ..... 0.. W .... 4!!'tj ~ CU 0: 0: ~ .~ 0.. .Q 0 " , 0:: 0:: 0::: Ill._ 'c Cl.:~ j U -c C ID 0 w 0 ... QI W W W - "- .. .. 01/) Vl Vl Vl ~ <C 0 U) ... .2 ~ t; cu.... U <C ~ W ....I .... .5 c w .c Z 1 0:: ::s <C .... ~ I- ~ "- QI toot D:: ~ J-I - > - .c;E c - - > ~ U III <C ... J-I ,E .... C (/)~ ... U U l.ij U) U ....I C .0. w 0 w D:: ..., <C .... ..., "C 0 0 I- :s cu 0:: C 0:: U :::) C 0. ta 0. U) cu i: Q) Q) <:: ~ 0 > > t;.~ * z~ :0 :0 a'sJ \I- .f9 ro Q) Oz ..., > -&....' 5} (/) C C 0:0 ~.s: 0 J-Iw VI Q) C Q) t~ Q) VI Q) VI ...,ro ~~ . I ~ E ~ VI Q) c"E; c '- ro Q) ~'e 0 a- - ;:)W 00. roo. f- VI ~~ I~ E ~ <::2 O:::~ ~'@ > ~< >--0 :2-0 roo. .- Q) <::a c_ >- :=0:: W .- tnz o Q) ro .9d ~ ' U z< f-u:: OLl.. 5"0 ;:,~ ~ '- '- Qj O~ 0 0 u:: t'j"" U 'c 'c <:::~ Q) Q) at1 :::) Vl Vl ijj (/) w ID U * Z .~ QI U) ~ ~ ~ lJi' U ~ V) Rl III <l: toot "iQ ....11I ....: <:i\.!,i0 W In =Rl :E 01 .<::-<: In .... .- C ::E ::E S- f&......' <C ~ ~Rl 1/).... VI..... ~~~s W Vl '- ~ .9d QI> a..c 0...0 c 0: B. ~ '~ Z ... E: >- ...... QI L.~ ~ '- 0 o..c Z 'iUu .:; :0 -oU tJ~~& e w QI:5! Q) C: - ro mq .... w Q QI ~ c VI C: ~ u.J C .~~~..... ~ ~ QI QI o .- ::E ro e ~ 4!! ~ . ,- Ql ... roVl -c~ <>:.!lJ Cl.: Z ~c ~a.. Vl,- c:-o... ~ ~ 0: <:l Z ~ - ;:) -0 c 0 0:: c t:~ Q) .- ro 0 o 5 ~Uj~~ W w 0 tn ro c VlU 01.- > tI) U Ql.- ..cQ) >- Q) c 0: ~&: is: .c> .~ Vl Q) '- Q) 0 \5 ~ ::E C: 19V1 ~t:;:~ ~ ~ :) 5'~ Vl ~Cll ~ ~ l.ij Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 31 rl , 1 , 1 '1 r 1 r 1 J , I . J . I I . ~ r 1 os GENE R. SCHRINER, P.E. President RESPONSIBILITIES: Business development and client relations for 40+ member consulting engineering and surveying firm. EDUCATION: West Virginia University, Morgantown, West Virginia Bachelor of Science, Civil Engineering - 1974 West Virginia University, Morgantown, West Virginia Post-Graduate Courses, Sanitary Eng., Solid Waste & Wastewater - 1974-1976 Presented Paper "Use of Bottom Ash for the Construction of a Septic Tank Effluent Disposal System", at the Ash Utilization Conference in Morgantown, West Virginia, 1977 PROFESSIONAL AFFILIATION: American Water Works Association Florida Engineering Society REGISTRATION: Professional Engineer, Florida #38821 EXPERIENCE: 1995 - Present Craig A. Smith & Associates, Boca Raton, Florida President Responsible for the business development of the 40+ member civil engineering and surveying firm with gross sales of $5.5 Million. Mr. Schriner initiates business development opportunities and client coordination. Also supervises and manages the Governmental and Utility Consulting Department. He is involved with securing and developing over 20 municipal clients throughout South Florida. Mr. Schriner is involved with the conceptual design and planning of water and wastewater treatment projects ranging in size from 1.0 MGD up to 10.0 MGD. Mr. Schriner provides solid waste facility operating consulting to Glades County and Okeechobee County. Directed the design and permitting of a 4.5 acre landfill addition at the Okeechobee County Landfill. As County Engineer for Okeechobee, Mr. Schriner has been responsible for the direction of all County related projects including development review, County wide stormwater improvements as well as local and state roadway improvements. Mr. Schriner has been directly involved with the development of three (3) 80 acre+ industrial parks including water, sewer, paving and drainage design and project funding. Mr. Schriner directed the production of numerous utility master plans for lake communities. 1987 - 1995 Craig A. Smith & Associates, Pompano Beach, Florida Vice President/Manager, Engineering Department Supervised the design of water treatment and wastewater treatment plants, pipeline projects, utility relocations, state and local roadways, stormwater management projects and general civil projects. He has also prepared utility facilities plans, DRI's, environmental impact studies, municipal comprehensive plans and has extensive experience in . transportation and airport planning and improvements. Mr. Schriner provided engineering consulting to municipal and private utility clients. He was acting County Engineer for Okeechobee County for three (3) years from 1990 - 1993 while with the firm, CRAIG A. SMITH & ASSOCIATES 32 Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 " 1 "1 r 1 os GENE R. SCHRINER, P.E. President 1985 - 1987 Sunbelt Environmental Corporation, Sunrise, Florida Vice president and Partner r I Involved with the preparation of technical proposals for the Corporation regarding FDOT/PD&E studies. Project Engineer for environmental impact portion of PD&E study for S.R. 514 in Brevard County. Responsible for design and permitting of hazardous materials storage and transfer facilities for Chemical Packaging Corporation including underground storage tanks for Deer Creek Country Club. I r 1 J , I Responsible for design of water, sewer, paving, and drainage plans for land development projects including the Kindercare, Williams Executive Center, and Faith Church. Coordinated an experimental sludge disposal and monitoring program as applied to orange groves in south Florida for the Palm Beach County Water and Soil Conservation Service. Directed activities, proposals and negotiations for purchase and management of utilities through privatization. 1980 - 1985 Craig A. Smith & Associates, Inc., Pompano Beach, Florida Project Manager - Environmental Engineering Division Responsible for the design and permitting of water and wastewater treatment plants for City of Sunrise and the Village of Royal Palm Beach. Designed and permitted the effluent disposal systems for the City of Sunrise, Village of Royal Palm Beach, and General Development Utilities. Designed and permitted sludge disposal systems for Sunrise, Royal Palm and Gulfstream Utilities. Prepared environmental impact studies, 201 facilities planning and the preparation of Utility Acquisition Reports. 1977 - 1980 Titanium Metals Corporation of America, Toronto, Ohio Pollution Control Engineer - Head of Plant Environmental Engineering Division Responsible for the preparation of the Environmental Engineering Division budget, the air and water sampling and reporting, performing noise surveys within the plant, the design of air handling air pollution control equipment (wet and dry scrubbers), the design and operations management of water and wastewater treatment systems for Toronto Plant, the design and management of solid and hazardous waste disposal systems and contracts, the preparation of air, water, wastewater, noise and solid waste studies for Toronto Plant. Also, responsible for the design of process fluid filtration system, the management and reporting for RCRA and TSCA compliance, and the supervision of meteorological cloud study for Henderson, Nevada plant. 1975 - 1977 VTN, Inc., Charleston, West Virginia Project Manager Responsible for the design and permitting of wastewater treatment plants, the preparation of 201 facilities plans, the preparation of 208 regional studies, and the design and permitting of sanitary landfills. Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 33 , 1 r 1 , 1 r 1 , , I I . I . 1 " - 1 j os STEPHEN C. SMITH. P.E. Senior Vice President & Chief Operating Officer RESPONSIBILITIES: Management of daily business operations of 50+ member engineering and surveying firm. EDUCATION: Auburn University, Auburn, Alabama Bachelor of Science, Civil Engineering - 1988 Auburn University, Auburn, Alabama Bachelor of Science, Building Construction - 1986 REGISTRATION: Professional Engineer, Florida #48914 EXPERIENCE: 1998 - Present Craig A. Smith & Associates, Boca Raton, Florida Senior Vice President & Chief Operating Officer Responsibilities include management of daily business operations for 50+ member civil engineering and surveying firm with gross sales of $6+ million. Oversee all areas of business including engineering, surveying, construction management services, accounting and human resources. Specifically oversees all transportation/roadway projects including studies, reports and design. Ensure proper allocation of resources, staffing, financial management, quality control and timely project completion. 1989 - 1998 . Craig A. Smith & Associates, Pompano Beach, Florida Vice Presidentrrransportation Project Manager Responsible for the Responsible for the stormwater and roadway projects. For example: . Stormwater Master Plans (City of Oakland Park) . Stormwater Master Plan (Town of Pembroke Park) . Stormwater Master Plan (Village of EI Portal) . Stormwater Master Plan (Town of Golden Beach) . Stormwater Master Plan (Town of Lighthouse Point) . Stormwater Master Plan (Okeechobee County) . Stormwater Master Plan (City of Sweetwater) . Stormwater Master Plan (City of Okeechobee) . McNab Road, (Broward County) . N.E. 8th Street, (City of Pahokee, Florida) . Seminole Pratt Whitney Road, (Palm Beach County) . Flamingo Road, (FDOT District 4) . State Road 70, (FDOT District 4) . University Drive, (FDOT District 4) . Pine Island Road (I) - (S.R. 84 - Sunrise Boulevard), Broward County . Pine Island Road (II) - (Sunrise Boulevard - Oakland Park Boulevard), Broward County . Andrews Avenue - (62nd Street - Racetrack Road), Client: Broward County . Aurora Road (Brevard County), FDOT District 5 . Wolff Road (Okeechobee County) FDOT District 1 . Biscayne Blvd. (163'd Street to 203'd Street) FOOT District 6 . SW 30th Avenue (Hallandale to Pembroke Road) Pembroke Park CRAIG A. SMITH & ASSOCIATES 34 Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 '1 , 1 CJIS STEPHEN C. SMITH. P.E. Senior Vice President & Chief Operating Officer . Okeechobee County Stormwater Master Plan (prepared for South Florida Water Management District and Okeechobee County) Misc. Projects including utility design and relocation, also inspection and evaluation of existing facilities. r 1 I . I r 1 I Also, responsible for project permitting which includes data collection, submittals and intergovernmental coordination with local, county and state agencies. Extensive coordination is required with Utility Companies regarding utility relocations and adjustments. Other responsibilities include computing vertical and horizontal geometry on projects from local streets, arterials and limited access freeways, and the use of Intergraph and Digicad software. , 1 1986 - 1989 Craig A. Smith and Associates, Pompano Beach, Florida Field Inspector Responsible for inspecting the construction of various utility facilities and land development projects. 1978 - 1983 Craig A. Smith and Associates, Pompano Beach, Florida. Survey Junior Crew Chief Mr. Smith was hired as a part time employee and started as a Survey Rodman. He was then promoted to Survey Instrument Man and then Survey Junior Crew Chief. . J Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 35 ORlANDO A. RUBIO, P.E. Senior Supervising Engineer Responsible for the development of project scopes, stormwater master plans, Federal Grant applications, advanced stormwater modeling using ICPR, HEC-RAS & CHAN modeling software programs, construction plans of various surface water management systems, development of environmental resources permit packages and permit agency coordination. Serves as client liaison/contact. Serves as Engineering to municipal governments. Provides engineering services during the construction of projects. University of Florida, Gainesville, Florida Bachelor of Science in Civil Engineering - 1988 Miami Dade Community College-South Campus, Miami, Florida Associates in Arts - 1985 REGISTRATION: Professional Engineer, Florida #48265 EXPERIENCE: 2001 - Present Craig A. Smith & Associates, Boca Raton, Florida Senior Supervising Engineer Responsible for the development of project scopes, stormwater master plans, Federal Grant applications, construction plans of various surface water management systems in accordance with established criteria, engineering principles, and normal construction practices, development of environmental resources permit packages and permit agency coordination. Conduct field & office visits with clients, permitting agency staff, and other project coordination as necessary. Conducts plan and engineer reviews for compliance for Municipal Clients. . J Projects include: . Ranch Lakes Estates Sanitary Sewer Improvements, Glades County, Florida. 2009 - on- going. Design and permitting of a forcemain with a lift station within the City of Moore Haven. . Village of EI Portal Stormwater Improvements (Phase II & IIIJ EI Portal, Florida, 2008 - complete pending certification. Per t.he CAS developed master plan, CAS designed and permitted the stormwater improvements within an area of the Village of significant historical flooding concerns. . NE 12dh Street Culvert Improvements, Okeechobee County, Florida. 2008 - on-going. Design and permitting of stormwater improvements within a low income housing area funded by a CDBG from Hurricane Wilma. . Lloyd Estates Drainage and Water Improvements, Oakland Park, Florida. 2007 - on- going. Design and permitting of a stormwater retrofit project within an area of significant historical flooding. Project funded by CAS obtained FEMA HMGP grant with a FDEP loan and City funds. . Doug/as Park Stormwater Improvements (Phases II & III), Okeechobee County, Florida. 2008 - on-going. Design and permitting of stormwater improvements within a low income housing area funded by a CDBG. . Okeechobee County Southwest Drainage Improvements, Okeechobee County, Florida. 2008 - construction pending. Design and permitting of stormwater improvements in accordance with the master plan within an area of significant historical flooding concerns. Obtained FEMA HMGP grant and County funds for project. CRAIG A. SMITH & ASSOClmS '1 , J I 1 OIS ORLANDO A. RUBIO, P.E. Senior Supervising Engineer . Ranch Lakes Estates Stormwater Improvements, Moore Haven, Florida. 2008. Design and permitting of stormwater improvements within an area of significant historical flooding concerns. Improvements included stormwater gravity collection system and stormwater pumping stations. CAS obtained the FEMA HMGP funding for the project. . Okeechobee County Stormwater Master Plan, Okeechobee County, Florida. 2005- 2007. Developed a comprehensive stormwater master plan for the urbanized areas of Okeechobee County and the City of Okeechobee. Problem area identification, H/H modeling, conceptual plan development, conceptual construction costs, and report. . NE ffh Avenue Drainage Improvements, City of Oakland Park, Florida. 2005 - 2007. Design and installation of a V2 mile long (4' x 7' box culvert) stormwater trunkline to serve existing neighborhoods within the City. CAS obtained FEMA PDM grant funding for this project. . Town of Golden Beach Stormwater Improvements (Phase III & Iv,), Miami-Dade County, Florida. 2004 - 2006. Design and permitting of stormwater improvements within an area of significant historical flooding concerns. Improvements included stormwater gravity collection system and stormwater pumping stations. . City of Sweetwater Stormwater Improvements (Phase II), Miami-Dade County, Florida. 2003 - on-going. Design and permitting of stormwater improvements within an area of significant historical flooding concerns. Improvements included stormwater pumping stations. . Doug/as Park Stormwater Improvements (Phase I), Okeechobee County, Florida. 2003 - 2004. Design and permitting of stormwater improvements within a low income housing area funded by a CDBG. . City of Sweetwater Stormwater Improvements (Phase III), Miami-Dade County, Florida. 2002 - 2004. Design and permitting of stormwater improvements within an area of significant historical flooding concerns. Improvements included stormwater gravity collection system and stormwater pumping stations. . City of Sweetwater Stormwater Improvements (Phase I), Miami-Dade County, Florida. 2002 - 2004. Design and permitting of stormwater improvements within an area of significant historical flooding concerns. Improvements included stormwater gravity collection system and stormwater pumping stations. 1995 - 2000 Broward County - DPEP - Water Resources Division Engineer III (Program Manager) Supervise the review of moderate to complex surface water management license applications consisting of administrative and legal data, engineering reports, computer program output and construction plans. Conduct review in accordance with established criteria, engineering principles, and normal construction practices to produce a written report in a prescribed format. Coordinate reviews with the SFWMD, FDEP, and/or County agencies. Expedite the reviews of sensitive applications on request. Conduct site visits, pre-application meetings, track licensed projects through FOXPRO database applications, and advise on matters in addition to surface water management license applications as necessary such as conflict resolutions, and responding to surface water quality and flooding complaints. Initiate progressive enforcement actions for violations of the Broward County Code. Participate in division budget process for each fiscal year. Conducted license application fee comparison study within the tri-county area including Hillsboro County. Supervise a staff of four employees; two engineers and two inspectors. Headed the delegation of the Environmental Resource Permitting program for Broward County from the SFWMD and FDEP (delegation approved Spring 2001). CRAIG A. SMITH & ASSOClMES "1 1 I os ORlANDO A. RUBIO, P.E. Senior Supervising Engineer Community Rating System Coordinator / Floodplain Administrator 1 J Administer FEMA's National Flood Insurance Program for Broward County (unincorp.) through the Community Rating System. Upgraded Broward County's Classification which resulted in an additional flood insurance rate reduction (5% - $380,000) for policy holders in the county. Maintain Broward County's minimum National Flood Insurance Program requirements in good standing. I 'I I I I I . 1 I I 1989 - 1995 South Florida Water Management District Staff Civil Engineer Review moderate to complex surface water management permit applications consisting of administrative and legal data, engineering reports, computer program output and construction plans. Conduct review in accordance with established criteria, engineering principles, and normal construction practices to produce a written report in a prescribed format. Coordinate review with other District units and agencies. Conduct site visits, pre-application meetings, and advise on matters in addition to surface water management permit applications as necessary. I 1 c ~ CONTINUING EDUCATION AND PROFESSIONAL DEVELOPMENT: CPM Short Course Computational Hydraulics Int. - PCSWMM 2000 UF TREEO - HEC - RAS Caice's XP-SWMM Software University of Florida - MODFLOW - Groundwater Modeling Using GMS Broward County - "Sunsational Service Training" National Corrugated Steel Pipe Association - Design of Underground Detention Systems (0.4 CEU) Palm Beach Community College - Institute of Government; "On Becoming A Supervisor" (0.6 CEU) & "Writing for Management" (0.6 CEU) Broward County - "Positive Start" (7.0 CEU) - Supervisor series U. of Miami-Continuing Studies - SFWMD Tech./Professional Program U. of Wisconsin - HEC 2 & WSPRO (3.6 CEU) - Computing water surface profiles for Floodplains & Bridge Hydraulics CRAIG A. SMITH & ASSOCINf'ES r 1 '1 . 1 , 1 i r 1 . I L , , J QS WILUAM H. lANDIS, P.E. Senior Design Engineer/Project Manager RESPONSIBILITIES: Responsible for the design and management of various storm water, water treatment, wastewater treatment, pipe line, pump station, and utility projects and all aspects of utility design and general utility consulting work. EDUCATION: PROFESSIONAL AFFILIATION: REGISTRATION: Drexel University, Philadelphia, Pennsylvania Bachelor of Science, Mechanical Engineering - 1962 American Water Works Association EXPERIENCE: Professional Engineer, Florida #0047801 1979 - Present Craig A. Smith & Associates, Boca Raton, Florida Senior Design Engineer/Project Manager Responsible for the design and operations of municipal water and wastewater utility systems as well as stormwater systems and pump station design projects. Specific areas of expertise include computer design, modeling and analysis, water and wastewater instrumentation and controls, pipeline design, pump station instrumentation and controls, utility financing, rate studies, and facility planning. Responsible for design of water distribution and wastewater collection systems, lift stations and controls, improvement plans for gas, water, sewer, paving, drainage, and all engineering related to municipal and land development improvements. Responsible for utility system computer analysis and modeling, developing rate structures, rates and charges for utility systems, preparing developer agreements, utility acquisitions, utility atlas, network analysis, utility rehabilitation, utility financing and all aspects of utility design and general utility consulting work. Projects include: . Storm water Pump Stations (East Central and West), Tamarac, Florida. Planning, design, permitting, bidding and construction management services. . Master Sewer Pump Station Rehabilitation Conversion, Village of Bal Harbour, Florida. Design, permitting, preparation of construction plans and contract documents, bidding, construction management and construction observation. . Master Sewer Plan, Pembroke Park, Florida. Perform site inspections, system analysis and modeling of force main network to develop overall sanitary sewer master plan to identify sewer improvements and costs. . Stormwater Pump Station, Village of Bal Harbour, Florida. Planning, design, permitting, bidding, construction management and construction observation services. . Water and Sewer Improvements, Pahokee, Florida. Design, Preparation of construction plans and contract documents, assistance during bidding, construction management, construction observation and assistance in securing funding for the project. . Port LaBelle Water Treatment Plant Improvements, Hendry County, Florida. Deisgn, preparation of construction plans and contract documents, assistance during bidding, RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 39 Proposer: Craig A. Smith & Associates os WilliAM H. lANDIS, P.E. Senior Design Engineer/Project Manager 'I construction management and construction. . Port LaBelle Water Distribution Expansion, Hendry County, Florida. Preliminary master planning and modeling of water distribution network for the entire Port LaBelle area. Final design, preparation of construction plans and contract documents, permitting, assistance during bidding, construction management and construction observation. . Stormwater Pump Stations No.1, 4, 6 & 8, Sunrise, Florida. Planning, design, permitting, bidding, construction management and construction observation services. . 1-95 Stormwater Pump Station, Pembroke Park, Florida. Planning, design, permitting, bidding, construction management and construction observation services. . Carolina Street Stormwater Pump Station, Pembroke Park, Florida. Planning, design, permitting, bidding, construction management and construction observation services. . Park Road & SW 24h Street Stormwater Pump Station, Pembroke Park, Florida. Planning, design, permitting, bidding and construction management services. . Forcemains and Sewer Pump Station Improvements, Pembroke Park, Florida. Design, preparation of construction plans and contract documents, permitting, assistance during bidding, construction management and construction observation services. 1962 - 1979 Selas Corporation of America, Dresher, Pennsylvania Senior Process Control Engineer I ~ 1 Responsible for engineering combustion equipment, instrumentation and process control systems for major steel mill related heating and process equipment for forging, rolling, heat treating and galvanizing processes. Also responsible for proprietary and industrial contract research, development and application of thermodynamic processes, associated instrumentation, controls and combustion equipment. . I Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 40 , 1 r I , 1 I , , 'I , 1 . J os PETER A. KUNEN, P.E. Supervising Engineer RESPONSIBILITIES: Project Engineer involved in the design of various water and wastewater treatment, distribution, and pumping projects. EDUCATION: PROFESSIONAL AFFILIATION: REGISTRATION: Florida International University, Miami, Florida Bachelor of Science, Civil/Environmental Engineering - 1997 American Society of Civil Engineers American Water Works Association Professional Engineer, Florida #60730 Certified Residential Contractor - 1993 State of Florida License No. CRC 056814 EXPERIENCE: 1998 - Present Craig A. Smith & Associates, Boca Raton, Florida Project Engineer, Project Manager Preparation of Engineering Design Plans for Water, Sewer, and Stormwater Pump Station Projects, Project Permitting, Contract Document and Technical Specifications Preparation, Project Management During Construction. Projects include: . City of Margate - N.w. 39th & 43rd Avenue Water Main and Forcemain Canal Crossing Water Main and Sewer Forcemain Design Engineering, Broward County EPD and Health Department Permitting. Project Engineer/Manager during Construction. . Town of Pembroke Park - Sewer Pump Station Improvements Project - Sanitary Sewer Lift Station Design Engineering Contract Document and Technical Specifications Preparation, Project Engineer/Manager during Construction. . Town of Pembroke Park S. W. 5:f1d Stormwater Improvements -Contract Document . and Technical Specifications Preparation, Project Engineer/Manager during Construction. . City of Sunrise - Stormwater Pump Station No. 6 - SFWMD Permitting, Contract Document and Technical Specifications Preparation, Project Engineer/Manager During Construction. . Sal Harbour Village - Emergency Watermain Connection - Water Main Design Engineering, Contract Document and Technical Specifications Preparation, Project Engineer/Manager during Construction. . Sal Harbour Village - Conversion of Pump Station No. 2 - Sanitary Sewer Pump Station Design Engineering, Project Engineer during Construction. . Town of Pembroke Park - . Carolina Street Stormwater Pump Station - Contract Document and Technical Specifications Preparation, Project Engineer/Manager during Construction. . City of Margate - Lift Stations Design and Renovations - Sanitary Sewer Lift Station Design Engineering, Service Area Flow Study. Project Engineer during Construction. . City/County Public Works Authority, Glades County- Pump Station and Gravity Sewer Addition - Sanitary Sewer Lift Station, Gravity Sewer Design. . City of Okeechobee - Lift Station and Forcemain Project - Sanitary Sewer Lift Station and Force Main Design. RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 41 Proposer: Craig A. Smith & Associates '1 1 , I . t , I cas. PETER A. KUNEN, P.E. Supervising Engineer 1993 - 1997 1982 - 1993 1984 - 1985 . Okeechobee Utility Authority- Water Distribution System 2000 Capital Improvements Projects (2000CIP) - Water Distribution System Design. . City of Tamarac - Stormwater Pump Stations East, Central, and West Renovations - SFWMD Permitting, Contract Document and Technical Specifications Preparation, Project Engineer During Construction. . City of Tamarac - Forcemain Improvements SW 70th Street - Force Main Design Engineering, Contract Document and Technical Specifications Preparation. . Port LaBelle - Wastewater Treatment Plant Operating Permit Renewal - DEP Permitting, Operations and Maintenance Performance Report. . New Hope Charities - Santa Maria Village Water and Sewer Lines Project - Water Main and Force Main Design Engineering, DEP & FDOT Permitting, Contract Document Preparation. . City of Pahokee - Water Treatment Plant Expansion - Preparation of Operations and Maintenance Manuals. . City of South Bay- Water and Sewer Improvements - Preparation of Operations and Maintenance Manuals. Obler & Company, Inc., Miami, Florida Residential Construction Project Foreman Residential Construction and Remodeling Projects Management and Supervision. Peter A. Kunen General Remodeling, Miami, Florida General Remodeling Trades, Self-Employed Architectural Woodworking, General and Finish Carpentry, Cabinetry, Interior and Exterior Painting. Airco Plating Corp., Miami, Florida Quality Control Inspector Inspection of Electrical Components and Aircraft Parts Required to Meet Stringent Military Specifications. RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 42 Proposer: Craig A. Smith & Associates r 1 , 1 cas. ALBERT J. CARUSO, E.I. Project Manager RESPONSIBILITIES: Responsible for the design of various components of land development engineering projects including design, calculations, cost estimates and certifications, feasibility studies and phase I environmental site assessments. EDUCATION: Middlesex County College, New Jersey Associates Degree in Engineering Technology - 1978 REGISTRATION: Engineering Intern New Jersey EXPERIENCE: , , I 1997 - Present Craig A. Smith & Associates, Boca Raton, Florida Project Engineer - ! Responsible for working on a variety of projects for Land Development including Walnut Creek and Harbour Lake Estates for Lennar Homes and Walgreens within the City of Tamarac as well as Phase I Environmental site assessments which included twelve sites for the City of Oakland Park Downtown District. Site plan design for AirGlades Industrial Park and City of Okeechobee Industrial Park. Prepared Stormwater Master Plans for the City of Oakland Park, Town of Pembroke Park, City of Lighthouse Point and Village of EI Portal. FEMA grant applications for Town of Pembroke Park and Town of Golden Beach. , t Projects include: . Town of Golden Beach Capital Improvement Project, Golden Beach, Florida. Ongoing. Project Manager/Designer of water and stormwater system improvements. . Douglas Park Stormwater Improvements (Phase II), Okeechobee County, Florida. 2008 - ongoing. Design and permitting of stormwater improvements within a low income housing area funded by a CDBG. . Okeechobee County Southwest Drainage Improvements, Okeechobee County, Florida. 2008. Design and permitting of stormwater improvements in accordance with the master plan within an area of significant historical flooding concerns. . Ranch Lakes Estates Stormwater Improvements, Glades County, Florida. 2008. Design and permitting of stormwater improvements within an area of significant historical flooding concerns. Improvements included stormwater pumping stations. CAS obtained the FEMA HMGP funding for the project. . NE (/h Avenue Drainage Improvements, City of Oakland Park, Florida. 2005 - 2007. Design and installation of a '/2 mile long (4' x 7' box culvert) stormwater trunkline to serve existing neighborhoods within the City. CAS obtained FEMA PDM grant funding for this project. . Okeechobee County Stormwater Master Plan, Okeechobee County, Florida. 2005- 2007. Developed a comprehensive stormwater master plan for the urbanized areas of Okeechobee County and the City of Okeechobee. Problem area identification, H/H modeling, conceptual plan development, conceptual construction costs, and report. . Town of Golden Beach Stormwater Improvements (Phase III & IV), Miami-Dade County, Florida. 2004 - 2006. Design and permitting of stormwater improvements within an area of significant historical flooding concerns. Improvements included stormwater pumping stations. Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 43 . 1 I os ALBERT J. CARUSO, E.I. Project Manager 1 . Douglas Park Stormwater Improvements (Phase I), Okeechobee County, Florida, 2003 - 2004. Design and permitting of stormwater improvements within a low income housing area funded by a CDBG. City of Sweetwater Stormwater Improvements (Phase II), Miami-Dade County, Florida. 2003. Design and permitting of stormwater improvements within an area of significant historical flooding concerns. Improvements included stormwater pumping stations. City of Sweetwater Stormwater Improvements (Phase I), Miami-Dade County, Florida. 2002 - 2004. Design and permitting of stormwater improvements within an area of significant historical flooding concerns. Improvements included stormwater pumping stations. City of Sweetwater Stormwater Improvements (Phase III), Miami-Dade County, Florida. 2001 - 2003. Design and permitting of stormwater improvements within an area of significant historical flooding concerns. Improvements included stormwater pumping stations. . . . 1986 - 1997 Sunbelt Environmental Corp. Boca Raton, Florida Project Manager/Designer As Sunbelt's representative, AI Caruso also performed Phase I Environmental Assessments. His involvement extends from the initial site visit through final report preparation and includes federal and State data base research, local regulatory agency file research and interviews with agency personnel and vicinity property owners, as well as documentation of historical background and natural features. His responsibilities included site planning, land development design, flood routing, feasibility studies and construction cost estimating. 1985 - 1986 Caulfield and Wheeler, Boca Raton, Florida Site Designer Responsible for working on site planning and Land Development design. Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 44 '1 I CJS GREGORY W. JEFFERIES Vice President - Subsurface Utility Engineering . 1 I J RESPONSIBILITIES: . 1 J , 1 I I , 1 I 'I Oversee and coordinate all utility location services, construction inspections and reporting activities. Perform constructability plan reviews and construction cost estimates. Provide support to all departments regarding the areas of utility locations, land development, roadway and bridge construction. Provide support for Business Development and Client Relations. Prepare proposals and presentations (static and PowerPoint@) on behalf of the firm. Coordinate and develop acquisition and marketing of proprietary three-dimensional ground penetrating radar tomography system and software. Prepare and implement post acquisition marketing strategies, trademark name "GroundScope" and real-world application, training and deployment. Respond to RFP/RFQ and Proposal requests for CART Related Services. Interface with technology scientists and developers. Oversee and coordinate start-up of outgrowth firm, MPS3D, LLC, for the strategic purpose of continued development and marketing of Radar Tomography and related subsurface imaging products. EDUCATION: t . ~ , , PROFESSIONAL CERTIFICATES: PROFESSIONAL AFFILIATION: Capella University, Minneapolis, Minnesota Bachelor of Science, Management & Leadership - 1996 Miami-Dade Community College, Miami, Florida Associate of Arts, Civil Engineering - 1986 American Concrete Institute Level II Certified FDOT Limerock & Structures Inspection Certificates FDOT Math & Plans Reading Certificate FDOT Nuclear Operator License #738 IMSA Worksite Supervisor Certified American Public Works Association National Utility Locating Contractors Association Underground Contractors Association of South Florida EXPERIENCE: 2000 - Present Craig A. Smith & Associates I MPS3D, LLC, Boca Raton, Florida Vice President - Subsurface Utility Engineering Responsible for complete day-to-day management and coordination of Subsurface Utility Engineering Division. Started division from the ground up including complete responsibility for personnel and equipment selections, client development and implementation as well as personnel training and evaluation. Responsible for estimates, bids, proposals and profitability. Directly supervise two utility location managers, four utility location field crews, four vacuum excavation crews and two ground penetrating radar/radar tomography and survey crews. Responsible for technology updates, personnel education, training, seminars RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 45 Proposer: Craig A. Smith & Associates GREGORY W. JEFFERIES Vice President - Subsurface Utility Engineering and conferences. Serve as liaison to internal and external clients on all matters relating to subsurface utility services. Research and develop specific applications and processes for the implementation of 3D Radar Tomography. Market and promote complete range of imaging services at various venues including trade shows, conferences and speaking engagements. Craig A. Smith & Associates, Pompano Beach, Florida Director of Construction Services - Land and Transportation Divisions Responsible for management and coordination of Land Development, Transportation and Governmental Projects, coordinating and reviewing plans, cost estimates and proposals, Performed construction site investigations and construction / constructability reviews, Managed and reviewed construction activities and supervised inspection personnel. 1996 - 1998 Designed Traffic Installation, Fort Lauderdale, Florida Senior Project Manager . I Responsibilities included overall day-to-day management of company operations. Prepared submittal, schedules, billing estimates, change orders, and conducted progress meetings. Supervised 200+ employee operation generating in excess of $20MM in annual billings operating in three states. t - ~ 1993 - 1996 Craig A. Smith & Associates, Pompano Beach, Florida Senior Inspector/Office Engineer Responsibilities included inspections of utilities, roadway, bridges, MOT, lighting and signalization. Prepared NPDES filing, monthly estimates and supplementals, progress reports and CEI invoicing, 1993 Avino Associates, Pompano Beach, Florida Senior Inspector Traffic signal inspection for County-wide project including; reporting, utility coordination and utility conflict resolution. 1991 - 1993 Metric Engineering, Miami, Florida Senior Roadway and Bridge Inspector Responsibilities included inspections of roadway, bridge, MOT, lighting and signalization. Also, prepared NPDES filings, monthly estimates and supplementals and supervised five subordinate inspectors. Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 46 Fl 1 r I I I I . 1 I J I I r I I I 1 - os ROBERT D. KEENER, P.S.M. Vice President RESPONSIBILITIES: Responsible for the operations of the company's survey department including survey field crews and survey technicians. EDUCATION: PROFESSIONAL AFFILIATION: REGISTRATION: Atlantic Community College, Mays Landing, New Jersey A.A. Degree - 1979 Seminars in Land Surveying: Minimum Technical Standards Seminar, Palm Beach Junior College - 1988 Introduction to Computer Aided Drafting, Indian River Community College - 1988 Tidal Boundary/Coastal Construction Control Lines, Stuart, Florida - 1989 Writing Legal Descriptions, Vero Beach, Florida - 1990 As licensure requirements, Mr. Keener has attended 24 hours of continuing education courses each bi-annum period since 1990. Florida Surveying and Mapping Society Professional Surveyor and Mapper, Florida #4846 EXPERIENCE: 2005 - Present 1999 - 2005 Craig A. Smith & Associates, Boca Raton, Florida Vice President of Surveying Overseeing all aspects and operations of the company's surveying division. Craig A. Smith & Associates, Royal Palm Beach, Florida Senior Surveyor and Mapper Responsible for the supervision of all survey personnel in the Royal Palm Beach Office. Coordinates and supervises the production of legal descriptions, parcel sketches, boundary surveys, earthwork calculations, plat preparation and right-of-way mapping for several projects. Project experience includes: SEMINOLE PRATT WHITNEY ROAD EXTENSION . Researched public records for proposed extension of Seminole Pratt Whitney Road from Northlake Boulevard north to Beeline Highway involving Indian Trail Improvement District and Scripps Research Institute Center. . Calculated corridor for future route survey to show relationship of existing improvements. . Supervised field and office work, tying control traverse to Palm Beach County monumentation. M-CANAL WATER LINE EXTENSION . Researched, gathered and analyzed information for nine (9) mile water line extension through western Palm Beach County. RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 47 Proposer: Craig A. Smith & Associates '1 CJIS r 1 r 1 . . . ROBERT D. KEENER, P.S.M. Vice President Performed calculations for corridor to facilitate design and oversaw all fieldwork. Supervised construction staking for water line. Supervised preparation of record surveys. . 1 STATE ROAD 7 EXTENSIONS . Researched public records/FDOT information for State Road 7 alignment north of Okeechobee Boulevard. . Performed calculation for alignment. . Supervised preparation of base maps for use by engineers in completing feasibility study (Exhibits). BANYAN VILLAGE UTILITY EXPANSION - PORT LABELLE/HENDRY COUNTY . Performed calculation for re-establishment of FDOT baseline along State Road 80 from existing water treatment plant, east for eight (8) miles for water main extension. . Supervised field and office work in preparation of base maps for engineering design. . Prepared boundary and topographic survey of existing water treatment plant for future expansion. . Calculated existing utility easements and State Road 80 rights-of-ways from legal descriptions for inclusion to base maps. . I WAUCHULA HILLS SERVICE AREA - HARDEE COUNTY . Performed calculations for six (6) mile +/- route survey along U.S. 17 and State Road 62 in Hardee County to facilitate water and sewer main extensions. . Supervised office and fieldwork for re-establishment of FDOT baselines along U.S. 17 and State Road 62 for use in preparations of base maps for engineering design. . Supervised preparations of base maps for engineering design. . Prepared boundary survey for 50-acre wastewater treatment plant site utilized for design. . Prepared wetlands survey for submittal to Florida Department of Environmental Protection. VANDOLAH ROAD/FORT GREEN ONA ROAD -- HARDEE COUNTY . Performed calculations establishing baseline for Vandolah Road and re-establishing FOOT baseline on Fort Green Ona Road. . Supervised field and office work on base maps for engineering design to facilitate construction of sanitary force mains. . Prepared boundary survey for design of wastewater treatment plant site. . Supervised construction staking of force main. . Supervised field and office work in preparation of record surveys at completion of project. NE 9TH STREET/CITY OF OKEECHOBEE COMMERCE PARK . Supervised route survey for engineering design along U.S. 441 and NE 9th Avenue, east to Taylor Creek. . Prepared sketch and descriptions for parcel acquisitions. . Prepared sketch and description for bridge crossing Taylor Creek. . Supervised boundary and plat preparations for City of Okeechobee Commerce Center, including all calculations. Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES . 48 r 1 '1 1 os ROBERT D. KEENER, P.S.M. Vice President , , I , 1 -t L-l , 1 I I 1995 - 1999 . Supervised survey of the CSX railroad adjacent to the Commerce Center for construction of railroad spurs. CITY PLACE . Supervised initial boundary and topographic survey for contractor to verify take- offs. . Performed calculations for all building placements and necessary field staking. . Performed quality control surveys for assurance of correct building placement and conformance to plans from the ground up. . Supervised P.S.M.'s and field crews performing construction staking of utilities, drainage, roadways, and record surveys for all site work. . Prepared miscellaneous legal descriptions as needed. BELLE GLADES BUSINESS PARK . Supervised boundary and plat preparations for industrial park along U.S. 441. CRESTWOOD SOUARE PLAT . Supervised boundary and plat preparations for large commercial site and State Road 80. ROYAL PALM BEACH BOULEVARD EXTENSION - ROYAL PALM BEACH/VILLAGE OF WELLINGTON . Prepared survey of proposed areas of alignment. . Prepared sketch and descriptions for land acquisition for Royal Palm Beach Boulevard south of State Road 80. . Prepared sketch and descriptions for parcel acquisitions by the Village of Wellington. . Calculated the baseline utilized by engineer for design and coordinated with FOOT engineer preparing plans for State Road 80 widening for continuity. Craig A. Smith & Associates, Pompano Beach, Florida Project Surveyor Responsible for supervising field crews and survey technicians for the preparation of boundary surveys, right-of-way surveys, plats, legal descriptions and sketches, earthwork computations, as-built surveys and construction surveying. Project experience includes: PAHOKEE SERVICE AREA . Researched and calculated corridor for construction of water main and sanitary force main along State Road 729 and U.s. 441 for six (6) +/- miles through the City of Pahokee. . Supervised field and office work in creating base maps for engineering design. . Supervised gathering of survey information of existing water holding tanks and wastewater treatment plant site in the City and coordination of engineering design. CITY OF OAKLAND PARK . Performed calculations for route surveys in miscellaneous areas of the City for drainage improvements. RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 49 Proposer: Craig A. Smith & Associates r 1 'I r J I , I . , 1 , 1 I I J ~ I -t '- 1: , I I I , , os ROBERT D. KEENER, P.S.M. Vice President 1990 - 1995 1985 - 1990 1984 - 1985 . Supervised field and office work in preparation of base maps for engineering design. TOWN OF PEMBROKE PARK . Performed calculations for route surveys in miscellaneous areas of the City for drainage improvements. ' . Supervised field and office work in preparation of base maps for engineering design. NE 62ND STREET EAST OF 1-95, BROWARD COUNTY . Traverse, establish horizontal and vertical control, and set baseline. Prepare FDOT quality right-of-way survey and right-of-way map. Prepare sketch and descriptions for easements and right-of-way acquisition. Treasure Coast Land Surveyors, Jensen Beach, Florida Partner Responsible for the supervision of all field and office work from project start to completion. Treasure Coast Land Surveyors specialize in survey work from new construction to mortgage (as-built) surveys. C.A. Mitchell and Associates, Inc., Port St. Lucie, Florida Field Crew Coordinator Responsible for the coordination of survey crews, computations, drafting and client relations. Project experience includes: . Construction staking of Interstate 1-95, Martin County (State job #3410), . Reconstruction of 5.2 miles of S.R. #811 (Alt. A-i-A) Palm Beach Gardens, Florida. . Reconstruction of U.S. Highway 1, Martin County, Florida. (Roosevelt Bridge to St. Lucie County Line). . Construction staking of the Gardens Mall, Palm Beach Gardens, Florida. . Construction stake-out of condominium projects including Evergreen Condominium and The Meadows Condominium. . Site plan calculations and drafting on numerous projects in Martin, St. Lucie, and Indian River Counties. . Field to office work on numerous mortgage surveys in Martin, St. Lucie, and Indian River Counties. Keith & Schnars, P .A., Stuart Florida Survey Crew Chief Supervised survey field crews in completing a wide variety of surveys on residential and commercial developments. Projects experience includes: . Caulkins Citrus Groves, Martin County . The Orangetree Shopping Mall . Whispering Lakes Golf Course . Hansons Landing, Seascape and Glenwood Condominium projects . Whithan Field Runway Control RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 50 Proposer: Craig A. Smith & Associates 1 , 1 -t " ! . J , . CJIS ROBERT D. KEENER, P.S.M. Vice President 1981 - 1984 1979 - 1981 1978 - 1979 Price Engineering, Stuart, Florida Survey Crew Chief Supervised field crews for private residential surveys and flood insurance surveys. Also involved in construction layout and drafting work. Price Engineering, Pleasantville, New Jersey Instrument man Responsible for private subdivision land surveys and the supervision of survey parties. Prudential Insurance Company, Northfield, New Jersey Debit Agent Responsible for insurance sales for the territory of Atlantic City, New Jersey. RFQ No. 11-11-02 CRAIG A. SMlm & ASSOCIATES 51 Proposer: Craig A. Smith & Associates , 1 I os MICHAEL D. SARVER, P.S.M. Senior Surveyor RESPONSIBILITIES: Responsible for supervising survey field crews and survey technicians. EDUCATION: r 1 . 1 PROFESSIONAL AFFILIATION: REGISTRATION: 1 Palm Beach Junior College Associate of Science Degree in Land Surveying West Virginia University Pre Med Courses - 09/70 - 05/71 Berea College, Berea, Kentucky General Courses - 09/69 - 05/70 Florida Surveying and Mapping Society Professional Surveyor and Mapper, Florida #4174 Licensed Land Surveyor, New Hampshire #728 EXPERIENCE: f ! I 2005 - Present Craig A. Smith & Associates, Boca Raton, Florida Project Surveyor Responsible for supervising survey field crews and survey technicians for the preparation of boundary surveys, right-of-way surveys, plats, legal descriptions and sketches, earthwork computations, as-built surveys and construction surveying. Project experience includes: TOWN OF GOLDEN BEACH . Oversee construction layout. . Prepare calculations for improvements. . Oversee/certify as-builts. PEMBROKE PARK - 48TH, 52ND & 56TH STREETS . Researched public records for rights-of-way and plat information . Calculated base information for establishment of base lines, etc. . Supervised field and office work in production of base maps for engineering design. MARGATE LIFT STATION REHABILITATION (8) . Researched public records for right-of-way and plat information. . Supervised field and office work in production of base maps for engineering design of lift station rehabilitation. . Checked specific purpose surveys for each of the eight (8) lift station areas. PORT EVERGLADES - PIER NO.1 SURVEY . Supervised field and office in production of comprehensive topographic survey with intermitted utility surface mapping. . Supervised production of topographic map presented to the client for major remediation project. RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 52 Proposer: Craig A. Smith & Associates , 1 1 os MICHAEL D. SARVER, P.S.M. Senior Surveyor 1 i PLATINUM AND LOFTS CONDOMINIUM PROJECTS - MIAMI . Coordinated record surveys both field and office for miscellaneous utility certifications. . Supervised field and office in preparation of final surveys and flood elevation certificates. , 1 , 1 ORCHID GROVE - POMPANO BEACH, FLORIDA . Performed calculations for the placement of numerous townhome buildings and condominium buildings. . Supervised field and office in preparation of plot plans, tie-in surveys, final surveys and flood elevation certificates as building completed. I 1 2003 - 2005 Carnahan-Proctor-Cross, Inc., Margate, Florida · 1 Daily operation of Microstation software for creation and completion of land boundary surveys with concentration in ALTAjACSM Land Title Surveys for land conveyance and or development. Preparation of boundary information for utilization by field survey crews and processing of collected field and record information for production of surveys. File reduction and processing of electronic field data. Assurance of quality control to projects and timely response to development projects. Composition of boundary, topographic, as-built and final surveys from field to finish with PSM certification. . t 1995 - 2003 Shah-Drotos and Associates, Fort Lauderdale, Florida r, Supervision of three to five field crews, daily contact with project developers and supervisors providing necessary survey field crews. Daily project calculations using AutoCAD and Eaglepoint computer software, application of calculated data to TDS and Husky data collectors. File reduction and processing of electronic field data. Assurance of quality control to projects and timely response to development projects. Composition of boundary, topographic, as-built and final surveys from field to finish with PSM certification. 1994 - 1995 Craig A. Smith &. Associates, Pompano Beach, Florida P.L.S. certifications, field crew supervisor, calculation department use of Digicad software. 1990 - 1994 Owen Haskell, Inc., Portland, Maine P.L.S. certifications, field to finish surveying projects of residential, commercial, and industrial nature. Experience with environmental and municipal issues relative to the surveying profession. Experience with survey cogo software and AutoCAD. 1989 - 1990 Sarver Land Surveying, Kennebunk, Maine Self-employed owner offering land surveying services. Responsible for all aspects of surveying services. Responsible for all aspects of surveying operations. Marketing, business administration, field and office operations, certifications, served as expert witness. 1986 - 1988 Underwood Engineers, Portsmouth, New Hampshire Managed surveying operations for civil engineering firm. Coordinated survey field operations, trained employees in field procedures. Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 53 '1 1 ') os MICHAEL D. SARVER, P.S.M. Senior Surveyor 1983 - 1986 Craig A. Smith & Associates, Pompano Beach, FL , 1 Survey crew party chief, performed metes and bounds and sectional lands boundary surveys: work included topographic and hydrographic field operations, field work for production of aerial mapping, condominium documentation, route location and design, subdivision development and commercial and industrial development. . I I 1978 - 1983 James F. Nash & Associates, Deerfield Beach, FL Party Chief of survey crew, performed same duties as listed immediately above. 1976 - 1977 Glasgow Inc., Clendenin, West Virginia Party Chief of survey crew, performed construction layout and right of way creation of Interstate 79 through sections of the state of West Virginia. . J 1975 - 1976 Lane Construction Company, Clendenin, West Virginia , J Party Chief of survey crew, performed same duties as listed immediately above. Construction of interstate highway system through West Virginia. L 1 Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 54 . J 1 , I I r 1 I . , , 1 -t i- ~ I . os ANTHONY GOMES Senior Field Representative RESPONSIBILITIES: Assistant to the Project Engineer for the inspection of work accomplished and materials furnished by the contractor with specialized expertise in roadway and bridge construction technology. EDUCATION: REGISTRATION: University of Massachusetts, Amherst, Massachusetts A.A. Degree in Business Management - 1973 Miami-Dade Community College, Miami, Florida Survey Courses - 1981 Florida Department of Transportation, Education Classes: Contract Plans Reading, Traffic Signalization, Math I, II, III, Base Course Certification, Asphalt courses Troxler Certification, Concrete (ACI) M.O.T. Signing & Paving Marking, Bridge Structural Inspection, Final Estimates Certified Asphalt Plant Technician - FOOT #R-1712 Certified Asphalt Paving Technician - FDOT #5659 EXPERIENCE: 1985 - Present Craig A. Smith and Associates, Boca Raton, Florida Senior Field Representative Responsible for the daily over-sight and certification of field construction. Field Liason for Civil and Environmental Engineering Projects. Projects include: . Currently serving as Resident Inspector on USDA Rural Development Project, Rehabilitation of Lift Stations, Town of Pembroke Park and Senior Field Representative on Water and Storm Drainage Improvement project for the Town of Golden Beach. . Served as Supervising Senior Inspector on various Broward County's CDBG projects; water, sewer, drainage, and roadway improvements. Sixth Avenue corridor, 6th T~rrace, Floranada, Sleepy River dredging project, 56th Avenue, 52nd Avenue, 56th Avenue, in the Town of Pembroke Park. American Express project in Plantation, Walnut Creek project, City of Hollywood. . Served as inspector on Village of EI Portal, Town of Golden Beach, City of Sweetwater Stormwater collection system projects, Miami, Florida. . Served as Field Representative for Broward County's 5 and 10 year permit renewal project. . Served as Consultant and Field Representative for FEMA - Department of Recovery, Disaster Relieve Program: Arcadia, Bowling Green, Wauchula, Fort Myers Beach, Damage Evaluation - Federal Highway and Bridges, Hardee County, Village of EI Portal, City of Sweetwater, and Town of Golden Beach. . Served as Supervising Senior Inspector on Broward County's Northeast 62nd Street road improvement project. RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 55 Proposer: Craig A. Smith & Associates c 1 f 1 I 1 , t , f os ANTHONY GOMES Senior Field Representative 1977-1985 . Served as Project Engineer on Cypress Creek road improvement project, from University Drive to Pine Island Road, Tamarac, Florida. Served as Inspector on Bal Harbour Village Stormwater Collection System Project. Served as Project Engineer on Andrews Avenue Improvements from Cypress Creek Road to Race Track Road in Broward County, Florida. Supervising Senior Inspector on Gratigny Parkway Projects, Section 2 and 3, Dade County, Florida. Responsible for implementing FOOT procedures in the field for major bridges and limited access highway including several interchanges. Senior Roadway Inspector/Utility Coordinator and Senior Bridge Inspector on the F.D.O.T. Gratigny Parkway Project; included all phases of F.D.O.T. pay items; underground, roadway, bridge, signing, signals, lighting, striping. Field Representative/Construction Inspector on several private jobs in Broward County, i.e., Arvida-Weston, Bonaventure, G&G Developers, Jacaranda, Village Lakes, Wood gate, etc. Senior Roadway Inspector, Asphalt Plant Inspector and Senior Bridge Inspector on Section IV of the Sawgrass Expressway. Client: Broward County. . . . . . . Craven Thompson and Associates, Inc., Ft. Lauderdale, Florida Laboratory and Field Technician Testing of soil, concrete and asphalt. Field roadway and bridge inspector on various Broward County road bond projects. Surveyor, instrument and assistant to party Chief. RFQ No. 11-11-02 CRAIG A. SMITH & ASSOCIATES 56 Proposer: Craig A. Smith & Associates '1 1 . 1 r 1 I I . , , , . I . . , . . J APPROACH / MEfHODOLOGY Craig A. Smith & Associates (CAS) is uniquely qualified to perform all professional services required for the complete design development for the construction of a drainage system along 174th Street from Collins Avenue west to just beyond the first complex curve. In summary CAS is best suited and qualified to provide professional services in-house for the City's 174th Street Stormwater Project. Stormwater improvement projects involve: . Surveying; . Engineering Design of Stormwater Conveyance, Treatment and Disposal/Discharge; . Engineering Design of Pipelines within Developed Urban Areas; . Roadway Design; . Utility Locating and Mapping prior to Design; . Permitting through DERM; . Construction Management. CAS provides all of these services in-house and is currently providing similar services to Bal Harbour Village and the Town of Golden Beach. Through the use of our unique 3D Radar Tomography and our familiarity with the City and surrounding area, we are best suited for this project. Our firm's primary expertise lies in stormwater system design and pipeline design including development of pipeline construction plans. CAS is typically involved with over one hundred (100) miles of pipeline replacements each year. Our capability in pipeline design, permitting and construction management is evidenced by our commitment to Stormwater Engineering using our exclusive SUE capabilities - Utility Locating, Mapping and Surveying - the three disciplines required for pipeline design and construction. CAS provides all of these services in-house from our office in nearby Boca Raton. CAS offers 3D Radar Scanning, a technology no other firm can offer that saves time and money as well as serves to prevent liabilities for our clients. More importantly 3D technology protects the citizens, visitors and businesses of our clients by preventing disruptions of the City's and private utility services. Because of our commitment to SUE, CAS acquired MPS3D, our wholly owned affiliate, with its exclusive 3D Radar Scanning license and patented underground mapping equipment capable of identifying and differentiating the types of pipes and other objects underground. CAS provides CADD printouts to our clients in three dimensions. This will allow the City's construction contractors to avoid problems when they dig, Our firm is capable of preparing base maps for design through the use of above ground surveying and underground surveying that is delivered to our clients signed and sealed with guaranteed accuracy. In addition, CAS only uses in-house qualified professionals operating on a daily basis out of our Boca Raton office. All work is under our direct supervision and control. Our 3D scanning is non-intrusive and maps all underground utilities and facilities with 100% coverage of the rights of way to be used for construction. The scanning is ground truthed with other conventional tools and equipment providing CAS and the City with the most accurate data possible to prepare designs and begin construction plans. This technology speeds up design time, CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 57 '1 . I I APPROACH / METHODOLOGY reduces costs, provides locations of all known and unknown underground facilities reduces liabilities during construction and can serve to virtually eliminate contractor claims. COMMUNICATION CAS' engineering and field crews are all fitted with the latest communication devices. All devices are connected via satellite. All data is real-time transmitted to our office for processing. CAS proposes to provide the City links to our production at certain intervals when desired. The City will be provided all project information electronically upon completion. , 1 The CAS in-house staff will be directed by Orlando A. Rubio, P.E., Project Manager and will have weekly production meetings. We propose to conduct project meetings with the City staff at least I . 1 twice a month or more frequent as needed. Mr. Rubio will be in direct communication daily and weekly with City staff throughout the project duration. We also conduct periodic project Quality Assurance / Quality Control review at certain milestones with our QAQC Team and City staff. KEY DECISIONS Gene R. Schriner, P.E., President and Project Director commits the firm's financial, professional and technical resources to the City. Our office is located on Glades Road at the Turnpike and is readily accessible to the City of Sunny Isles Beach. Mr. Schriner can make all decisions for the firm in any capacity as it relates to the project. He will directly communicate with the City's staff in charge and/or attend any meeting requested by the City. CAS works for the City and will make decisions as requested by the City and strive to meet all of the city's needs if technically sound and legal. Decisions shall always be made based on the health, safety and well being of the public and in the best interest of the customers. CONFLICT RESOLUTION Field conflicts will greatly be reduced or eliminated with our 3D Radar Scanning uncovering all underground utility conflicts. This tool is unprecedented in resolving utility conflicts. CAS technology and protocol to be utilized for these pipeline projects eliminates utility conflicts, avoids delays during construction and minimizes claims. Project conflicts and issues will be addressed immediately upon notice by Gene Schriner and City staff. Mr. Schriner is the ultimate and final decision by CAS and commits to resolving any and all issues to the satisfaction of the City. CAS is a local firm with local employees of South Florida and City of Sunny Isles Beach, and commits to resolving any and all conflicts to secure continued employment for our local residents. CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 58 r 1 1 1 , 1 J . I j ~! APPROACH / METHODOLOGY COORDINATION WITH OTHER UTILITIES Coordination with other utilities is the strength and expertise of the CAS team. Through our commitment to SUE, 3D Radar and other disciplines required for underground utility design and construction, CAS is the best candidate. CAS is directly involved with, and intimately understands the importance of effective Utility Coordination and communication with public and private utility owners and authorities. Successful coordination efforts minimize project delays, construction costs, and contractor claims associated with utility issues and provide for better overall project outcomes. CAS has a proven record of accomplishment of engaging and involving utility owners in all phases of the project process through outreach and communication. We have developed and demonstrated mechanisms that support ongoing participation by all parties and we maintain strong relationships and cooperation with many utility owners. Through early engagement and communication with utility owners, CAS can more consistently and effectively control project schedules and budgets. CAS provides all levels of utility coordination, utility location and subsurface utility engineering services. Through current commitments and past experiences, CAS has been tasked with developing focused local coordination efforts to bring together representatives from diverse functions that are involved in the utility coordination process to ensure ongoing successful implementation and to maximize the benefits of the process. Drawing upon our experience and relationships with the major utility owners; FPL, AT&T, FPUC, Comcast and others, CAS has successfully optimized the project development process with greater emphasis on early coordination efforts, consideration of existing and proposed utility installations on the front end of a given project and reduced design and construction time later in the project process. GENERALIZED PROJECT APPROACH CAS is a client oriented firm. Our philosophy is to work with the City's Staff to provide the best possible services and solutions to complete the project cost effectively and within the City's budget. CAS works within a team approach while making the City's Staff an integral part of the team. All projects will be developed in the most cost effective project scopes to achieve successful results. CAS will also investigate possibilities for outside funding of projects when at all possible. CAS employs a quality assurance team throughout the project. The team meets regularly with CAS staff and City staff to provide value added solutions, liability checks, and design accuracy at no extra cost. We perform in-house value engineering to seek the best possible cost effective timely project for the City. Our radar scanning capabilities add value specifically to road, drainage and utility projects; providing added accuracy, reducing time and limiting future construction liabilities, and conflicts through our Project Director and President, Gene R. Schriner's commitment to perform. . CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 59 , 1 '1 F 1 APPROACH / MErHODOLOGY The CAS philosophy utilizes a phased approach towards assisting the City in problem solving and for implementation of the project. Our project approach is follows: PHASE I - PROJECT DEVELOPMENT AND PLANNING . Meeting with City Staff to develop the project scope . Develop a fee proposal to match the project scope; lump sum or hourly . Finalize the scope and proceed with a kickoff meeting with the City Staff . Schedule of Values and Costs to City . Establish milestones PHASE II - PRELIMINARY DESIGN ENGINEERING . Survey site and develop base maps for design . Soil borings and testing as required . Review existing plans and evaluate field conditions . Utility Locates utilizing available designating technologies; 3D Radar Scanning . Utilize necessary Engineering design methods . Establish all design requirements for City approval . Establish all permitting requirements . Prepare preliminary cost estimate and project schedule . Prepare preliminary engineering project report . Quality control meetings with CAS staff . Meet with City Staff to review project design, schedule and budget . Prepare preliminary Bill of Materials PHASE III - FINAL ENGINEERING . Finalize base sheets for design . Preparation of final construction plans . Preparation of final specifications and contract documents . Finalize cost estimate . Meet with City Staff to review project design, schedule and budget . Finalize permitting . Provide Bill of Materials for purchase of equipment PHASE IV - CONSTRUCTION . Mobilize and prepare site . Prepare safety plan . Project field stake-out . Begin construction . Shop drawing submittal . Construction management and administration . Construction inspection . Final construction . Final punch-list CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 60 r 1 1 r I , 1 , 1 . I APPROACH / METHODOLOGY PHASE V - OPERATIONS & START-UP . Prepare Project Startup and Testing Plan . Project Close-Out . Conduct operator training Sessions . Supervise, manage and coordinate all startup and testing activities . Provide Operation and Maintenance Manuals . Prepare record drawings and specifications . Prepare final accounting and close out reports Quality control throughout the Project Duration is handled by means of a check and balance system and through the team's client relationships we form during the project providing open and honest lines of communication. Members of the Project Team will meet regularly to establish consistent quality review framework. . Quality Standards are fundamental to the success of the project. CAS prides itself on the consistent high quality of our output, whether it is project plans, specifications, design elements, comprehensive studies, survey, GIS mapping, utility locates or grant writing. . At CAS we are committed to achieving and maintaining the highest quality standards possible and ensuring the client's satisfaction. PROJECT MONITORING & BUDGETING In order to get the most accurate budget price at the pre-construction phase and the construction phase, CAS details all design items into many small parts that will add up to one whole part (Bill of Materials). By doing this our cost estimates are very accurate. Our track record with cost estimates to bids has been within 5-10%. CAS' philosophy utilizes a phased approach towards assisting the City in problem solving and for implementation of public works and planning projects. Schedule, Cost Control and Team Work - the CAS approach is to develop milestones and defined deliverables with the City in order to meet the City's requirements. We try to identify potential issues early in the project so necessary action can be taken to keep the project on schedule. We continually update the cost of the project in order to stay on budget. If an issue develops with the schedule, cost or the budget, we advise the City and develop a plan for corrective measures with the staff. We consider the City and CAS as one team, all striving for the same goal of a quality product on schedule and on budget for the City's residents. CAS Technical Reviews are conducted throughout the project schedule by the Principal members of our firm as part of our commitment to quality engineering. Our goal is to have no change orders. CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 61 'I APPROACH / MEJHODOLOGY ABILITY TO MEET SCHEDULE , 1 1 CAS prides itself on our ability to tailor our services to meet our clients' needs. We are proud of our past history of successful, timely design projects. This success is a result of our highly experienced staff members who have created a cohesive team ensuring projects are completed in a timely and cost effective manner. CAS is dedicated to execute the project schedule established at the beginning of the project. Most projects shall include a pre-design conference to establish the project contact with the City, regulating agency and CAS. From this meeting a detailed project schedule will be created, including a Schedule of Values. This will be updated through the project design/construction process. Design team updates will be provided on a regular basis as requested by the City to all involved with the project. Status of each milestone identified at the initial project "kick-off' meeting will be provided on a monthly basis with an updated project schedule, similar to the following example. , 1 The CAS process will be a methodical and timely approach. The established goals identified in the project imitation will be implemented through the construction phase of the project. SAMPLE SCHEDULE ~'Mjcrosoft Project. EI Portal 5(!a waU.mpp: r;](Q)[R) , I ;~ fle t<R iJow ~ _ lools eoo)ect _ tlo\> i'D"~-gi'j-ii"~'r'i..~nlii\'~T;;-!-i!;;"~~'~~!-~'\iiii-!;o;0;;;:'; ':--:"r~-El:"~"-'o"l[J '.-0- J. . · - s-.ow-l AM .. -I DIU i[~. 'II [ AI'.... - rv~1 ,S;_ ."..."'''"''.'''''''''""............,~~.~~~.~-'~~~~.~~. I :TasiNMle ..I' IA.nti:.n ~' 17 '05 24 'OS 1'05 Mo. e'05 15'OS .. i ...:.J l:SMT TFSSMT TFSSMT TFSSMTWTFSSMT ..~....!~_'y.1.~~'~.~!..~~.~~..~~.~~~~!..~.~.~_~~~.~~.~~.~..1 106 days' 1 tl:i~... .... ...t:,,,:21!~..,..!t.l::~...I!:.._..i.......:...: I ~~.,~ !ri ~:. ~~j B~I;(..;...~....... l...'m -'.. ~Y!',.,- .,:,. "~. .+~~l.~:::-:.:::?~~~~~ .+...-. ...~~:~~rt~ 1 ~.-.:..'~ >(::~: oi''-:<-~. ~'c;t? +H ~~:,~.'..._.._.. .-........ .:-- ....!~~I::~ : ;'I!S, ;;ii :.'!~ -ff1 -- --Co$tE~~' 5deys: !' : ;.~,:::~.:~ .-" ;--..:. :~~_':;;'. ~..~lE~ ''1.~~'' i ~"lll '.' lit.rc --i ... ';i -[ Iz 0:;: .~:;'-:g d: "I -, II. - ')1.-., -.. c'i~.. ~_~_-~...j"I:. . .Il,l.. :,:,.lj:...-."..l,..:;l: :::, :-;.'J3~): - _ c, ~~, - :t~ .... t '.-Jlt.:,-: ....::; '1 ~ m""'_'1 f ...... .,_,__m___ ft';:;i'" rc~j,~:- f;M'. LV..R"L.' r(~~:~.- /-- .u!lJ!J , I CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 62 , 1 , 1 I I . 1 I I I I I 1 ~ , I REFERENCES We encourage you to contact the following references for whom have performed stormwater projects. BAL HARBOUR VILLAGE 655 96th Street Bal Harbour, Florida 33154 Contact: Alfred Treppeda, Village Manager Telephone: (305) 866-4633 Email: manager@balharbourflorida.com TOWN OF GOLDEN BEACH 1 Golden Beach Drive Golden Beach, Florida 33160 Contact: Alexander Diaz, Town Manager Telephone: (305) 932-0744 Email: alexdiaz@townofgoldenbeach.us SPRING LAKE IMPROVEMENT DISTRICT 115 Spring Lake Boulevard Sebring, Florida 33876 Contact: Joe DeCerbo, District Manager Telephone: (863) 655-1715 Email: jdecerbo@springlakefl.com CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 63 r 1 I I , 1 I January 17, 2006 , I To Whom'lt May Concern: . , , I I J I Craig A Smith and Associates (CAS) has been the Village Engineer. for the past 17 years and handles all our stormwater iesues.. The Village was built after World War Two on a barrier., Island very close. to sea ievel, which 'created floodihg, problems. Over the years CAS has been upgrading the old stormwater system for the Village. CAS designed and oversaw ttie construction of the stormwater' collection system and stormwater. pump station that collects the water from the streefs and then pumps' the stormwater to shallow injection wells. After the first flush, the stormwater is pumped to the yacht basin that flows into th~lntracoastal Waterway. This system has eliminated majorflooding during heavy rain events. Bill Snow and Bill Landis were the project team leaders for the pump station portion of the, project. ,,' The pump station has a bar screen, two 90 cfg axial flow pumps", an underground. concrete pump sump and a control panel with a receptacle:. for an emergency generator. Based on our experience, I, on behalf of Bal Harbour Village, recommend/CAS for engineering and storm drainage work. Please feel free to call me if you' have any questions. I I I I I I I N Ifred J. Treppeda Village Manager BaJ,H,' ',~tborir;Vill' . e:JlaU .,655..96thStr,'eet'Bal, '.'Harbour',.]1~t,h 3, 5154' '..305~8664635::..Fax:305-8liR~6575c,' "'proP6ser:'craig'A:1milh & Assodales' .. ~FQN6::11-11~02':' ",:""-"'-":0:::"',,,,<.: '." ,. ...., .......,. . 'l3~' '. ., 1 , 1 I 1 1 John P. Lyons Mayor Emma Shoaff Vice Mayor Howard P. Clark, Jr. Clerk Commissioner Ashira A. Mohammed Commissioner Annette Wexler Commissioner Dr. Robert A. Levy . Town Manager Christopher J. Ryan Town Attorney TOW"N OF PEMBROKE PARK 3150 S.W. 52ND AVENUE. PEMBROKE PARK, FLORIDA 33023' BROWARD (954) 9664600' FAX (954) 966-5186 January 12, 2006 Dear Sirs, Craig A.. Smith and Associates has designed four (4) Stormwater Pump Stations for the Town of Pembroke Park solving major flooding problems in our Town. . One of these projects was awarded the American Public Works Association (APWA) 2003 project of the year award. The Town did not have any stormwater outfalls. CAS designed and worked with the Florida Department of Transportation to fund a system to allow the Town to pump stormwater to the C-10 Canal. The first project was a Pump Station along 1-95, which discharges stormwater through a 60-inch. pipe tunnel under the CSX Railroad to a drainage ditch along the CSX Railroad and finally to the C-10 Canal. The design also includes an 84-inch stormwater conveyance pipe tunnel under 1-95. . The second project was a major stormwater pump station at Carolina Street that pumps the water from Trinity Lake under the. CSX Railroad to the 1-95 Pump station pipe line and finally to the C-10 Canal. The third project is a stormwater pump station on Park Road and 24th Street that pumps stormwater from residential lakes through the DOT system to the C-10 Canal. The fourth project was a stormwater pump. station on Park Road and 25th Street that pumps stormwater to Meekins Lake. William P. Snow was tlie Project Director, William H. Landis was the Project Manager, and Peter A. Kunen was the Project Engineer for these projects. This team designed and oversaw the construction of these innovative projects that have helped prevent any future flooding within The Town of Pembroke Park. If you have any questions regarding these projects feel free to give me a call. Sincerely, ~#~ Todd Larson, Public Works Director Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 65 r I 1 r 1 Jolm P. Lyons Mayor Emma Shoaff Vice Mayor . I i Howard P. Clark, Jr. Clerk Commissioner Ashira A. Mohammed Commissioner Annette Wexler Commissioner Dr. Robelt A. Levy Town A1anager Christopher J. Ryan Town Attorney . I I . TOWN OF PEMBROKE PARK 3150 S.W. 52ND AVENUE . PEMBROKE PARK, FLO~A33023 . BROWARD (954) 9664600 . FAX (954) 966-5186 August 2, 2004 Mr. Craig A. Smith, P.E. Chairman Craig A. Smith & Associates . 1000 West McNab Road Suite 200 Pompano Beach, Florida 33069 RE: AMERICAN PUBLIC WORKS ASSOCIATION 2003 PROJECT OF THE YEAR AWARD Dear Craig: As Mayor of the Town of Pembroke Park, I would like to thank you for helping our Town achieve the American' Public Works Association's 2003 Project of the Year Award. The award has been presented to us for the Carolina Street Pump Station. The award is for Outstanding Achievement in Public Works, The selection process was based on the use of good design and construction management techniques. It also required the demonstration of safety, environmental and public techniques, improving the reiations between agencies, public, and private industries. As you are well aware, Pembroke Park has been plagued with storm water problems for many years. Through the efforts of your fIrm, we have successfully achieved the elimination ofthi's problem through the design, construction, and implementation of three major pump stations, and related collection systems. I would like to thank your fInn for your excellence in design, diligence on the project, and continued support of Pembroke Park in its continued efforts to make Pembroke Park a great place in which to live and conduct business. This award is in recognition of the alliance between the Town, the agencies, the engineer, and the contractor. We all recognize that it takes team effort to make a project such as this most successful. Your fIrm has always shown itself to be a team player. On behalf of the Town, I wish to thank you for your participation in this project, not only from the engineering standpoint, but for assisting us in obtaining grants and other funding to help us achieve these needed public works projects. Keep up the good work. I \ Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 66 , I I I City of Sweetwater January 23, 2006 Mr. Steve Smith Craig A. Smith & Associates 1000 West McNab Road Pompano Beach, Florida 33069 RE: Stormwater Improvements Dear Mr. Smith: The City of Sweetwater has enjoyed working closely with your firm on the stormwater improvement projects. For many years our city has experienced excessive flooding causing costly physical damage throughout the city for both public and private properties. These improvements that your fIrm played a critical role in should be able to keep us dry for many years to come. ' , Over the last couple of years we have weathered several storms in our community with no flooding in the areas where the newly designed pump stations have been constructed. Our residents are excited about forgetting the days of our traditionally flood prone community. We look forward to continuing to work with your firm on many different projects in the future. ' Thanks again for being an integral part of this process. Sincerely, ~~ Mayor Manuel Marono PrQI2Q.se.r; . Cra!.9_A Smith & Associates RFQ No. 11-11-02 67 OUU ':S.W. lUYth Avenue, Sweetwater, Florida 33174-1398 · Telephone: 305-221-0411 . Fax: 305-221-2541 , I , 1 , 1 City of T amarac "Committed to Excellence...Always" Public Works , 1 . I January 18, 2006 Dear Sir/madam: " Craig A. Smith and Associates designed the City of Tamarac's three (3) pump stations with a flow of 35,000 gallons per minute (GPM) for each pump as part of our Stormwater Rehabilitation Project. At a construction cost of $1.5 million per station, the design of the pump stations consist of the following. . Stilling Pond . Bar screen . Emergency generator . Axial flow pumps . Telemetry . Head wall into C-14 canal While the Project Director, William P. Snow, is responsible for the building design and over all project design, the Project Manager, William H. Landis, is responsible for the pump design and Project Engineer, Peter A. Kunen, is responsible for the technical specifications and engineering services during construction. Construction of the west and central pump stations were completed in December 2005. The east pump station is' currently under construction. We are pleased with the finished product and expect to get many years of service from them, Please feel free to contact me at (954) 597-3701 if you have any questions. Sincerely, ~~------- Jack Strain Director of Public Works Copy: Alan Lam, Civil Engineer II/Project Manager Administration (954) 724-2500 . Operations (954) 724-2410 . Engineering (954) 724-2411 6011 Nob Hill Road - Tamarac. Florida 33321-6200 - Fax (954) 724-2428 - www.tamarac.org Proposer: Craig A. Smith & Associates RFd9\;jBI.OfP-~-'b\l Employer 68 rl '1 I OFFICE LOCATIONS '1 I Point of Contact: Gene R. Schriner, P.E., President I 1 , 1 Palm Beach Office: Corporate Headquarters 7777 Glades Road Suite 410 Boca Raton, Florida 33434 (561) 314-4445 I I I 1 I I , I Broward Office: 1000 West McNab Road Suite 114 Pompano Beach, Florida 33069 (954) 782-8222 Miami-Dade Office: 799 Brickell Plaza Suite 804 Miami, Florida 33131 (305) 940-4661 . , CRAIG A. SMITH & ASSOCIATES Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 69 "1 I 1 I DELIVER TO: City of Sunny Isles Beach City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 REQUEST FOR QUALIFICA TIONS SECTION 6 BID SUBMITTAL FORMS OPENING: 10:00 A.M. 12-02-11 , 1 I I PLEASE QUOTE PRICES F.O.B. DESTINATION, LESS TAXES, DELIVERED IN CIlY OF SUNNY ISLES BEACH, FLORIDA I I J NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Bid price should be less all taxes. Tax Exemption Certificate furnished upon request. : " I I ; Issued by: Purchasing Agent Date Issued: 11-08-11 This Bid Submittal Consists of Pages 20 through 23 Sealed bids are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. RFQ 11-11-02 CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS A Bid Deposit in the amount of 0% of the total amount of the bid shall accompany all bids A Performance Bond in the amount of 0% of the total amount of the bid will be required upon execution of the contract by the successful bidder and City of Sunny Isles Beach Procurement Aoent: Marcanthony Tulloch Firm Name: Craig A. Smith & Associates, Inc. Commoditv Coders): RETURN ONE ORIGINAL AND FOUR COPIES OF BID SUBMITTAL PAGES AND AFFIDA VITS FAILURE TO SIGN PAGE 23 OF SECTION 6 BID SUBMITTAL WILL RENDER YOUR BID NON- RESPONSIVE City of Sunny Isles Beach I Request for Qualifications No. 11-11-02 Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 70 SECTION 6 BID SUBMITTAL FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID 1 . 1 Addendum #1, Dated 11/14/2011 . I Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated . , Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: D NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID FIRM NAME: Craig A. Smith & As ociates, Inc. DATE: 12/02/2011 AUTHORIZED SIGNATURE: City of Sunny Isles Beach I Request for Qualifications No. 11-11-02 Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 71 I I I BID SUBMITTAL FORM Bid Title: CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS " I I The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of Sunny Isles Beach in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. The Proposers accepts all of the terms and conditions of the Advertisement or Request for Qualifications and Instructions to Proposers, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within ten days after the date of the City's Notice of Award. In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that: The Proposer has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. · The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. · This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposers to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and/or Notice to Proceed. City of Sunny Isles Beach I Request for Qualifications No. 11-11-02 Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 72 ri r 1 r 1 Firm Name: Craig A. Smith & Associates, Inc. Street Address: 7777 Glades Road, Suite 410, Boca Raton, FL 33434 Mailing Address (if different): Telephone No. (561) 314-4445 Email Address:gschriner@craigasmith.com Fax No. (561) 314-4457 FEIN No. ~~-l:J~JJ!2J~.!J~ , , , 1 * "By signing this document the bidder agrees to all Terms (Signature of authori Print Name: Gene R. Schriner, P.E. r Signature: Title: President THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. City of Sunny Isles Beach I Request for Qualifications No. 11-11-02 Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 73 1 , 1 NON-COLLUSION AFFIDAVIT r I I City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 STATE OF FLORIDA ) COUNTY OF Palm Beac~ r 1 The undersigned being first duly sworn as provided by law, deposes, and says: This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of, Craig A. Smith & Associates, Inc. (Name of Corporation, Partnership, Individual, etc.) a, Corporation (Type of Business) , formed under the laws of Florida (State) of which he is President (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid, or that such person, firm or corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 10.2, has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to any erorage,n m6J~ r ~ President AFFIANT'S TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this 2nd day of December Personally Known X or Produced Identification 2011. Type of identification ~~9.~ PI.1/l R~ ~"0 . . ~ S "'OFf\.O~ Notary Public State of Florida Amanda J Kidwell My Commission DD853842 Expires 01/25/2013 ......... (Affix seal here) Amanda J. Kidwell Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 74 r 1 r 1 PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES , 1 PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to City of Sunny Isles Beach by Gene R. Schriner, P.E., President [print indiVidual's name and bile] for Craig A. Smith & Associates, Inc. [print name of entity submlltlng sworn statement] whose business address is: 7777 Glades Road, Suite 410, Boca Raton, FL 33434 and (if applicable) its Federal Employer Identification number (FEIN) is 59-2010476 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: .) 11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1 )(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. I understand that "convicted" or "conviction" as defined in Para, 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere. 11.4. I understand that an "affiliate" as defined in Para. 287.133(1 )(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 75 f 1 market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. r 1 11.5. I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) X Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989, The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ,CHANGE H I ORMATION CONTAINED IN THIS FORM. By: (' re) Gene R. Schriner, P.E. (Printed Name) President (Title) Sworn to and subscribed before me this 2nd Gene R. Schriner, P.E. day of December ,2011, by o~~~I\Y Pv~(. Notary Public State of Florida ~ 1: Amanda J Kidwell ~ . ~ My Commission 00853842 ~ OFf'-oot! Expires 01/25/2013 nown .,AX.'^,,.....A~,....'OR'itroa uc . ~ ~J{jdJJJe.QQ Signature: Notary Public - State of Florida Amanda J. Kidwell Print or Type Commissioned Name (AFFIX NOTARY STAMP HERE) Personally aentification Type of Identification Produced Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 76 r 1 . ] r 1 I EQUAL OPPORTUNITY / AFFIRMA TIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 r 1 J EQUAL OPPORTUNITY I AFFIRMATIVE ACTION STATEMENT r 1 I The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. , 1 . I , I 1 , 1 I Sighed: ~~ President Title: Firm: Craig A. Smith & Associates, Inc. Address: 7777 Glades Road, Suite 410 Boca Raton, FL 33434 Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 77 '1 . 1 I CONFLICT OF INTEREST '] City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 CONFLICT OF INTEREST STATEMENT , 1 I The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTY OF Palm Beach BEFORE ME, the undersigned authority, personally appeared Gene R. Schriner, P.E. deposes, and states: , who was duly sworn, . I tr President 1.8.1.. AI S . h &q)ll . t e r 1 Et craig . mlt ASSOCla es, nc. with a local office in V laml, I (joca Katon, t-L of and principal office in 18.'. ThA ::lhnVA n::lmArl Antitv i~ ~I Ihmitting a Bid for the City of Sunny Isles Beach, Bid No, RFQ #11-11-0~escribed as: Civil Engineering Services The Affiant has made diligent inquiry and provides the information contained in this AffiaaVlt oasea upon nls own Knowleage. 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 18.5 Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor anyone associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 18.71 certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of SLlnny Isles Beach. 18.8 I certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.9 In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately nort e City Uny Is Beach. ecember ,J"- ,2011. ,2010. Gene K. ~cnnner, 1-'.1::. Print or Type Name and Title Sworn to and subscribed before me this 2nd day of December, 2011. Xl Personally Known X OR o Produced Identification ; Type of 21.tification ~ NOTARY PUBLIC STATE OF FLORIDA /YYI(i./{I(/fA ~. ~iJ..J.JiQJ. V'V"V'V'V'V" o..~~. .Vqi. Notary Public State of Florida .:; 1- Amanda ,J Kidwell ~ . if My Commission DD853842 ~ OFf,9~ I:xpir9s 01/25/2013 . ..V'\"',,".,;,^,........-""^I",,...~"^^^ Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 78 '1 , I I DISPUTE DISCLOSURE '1 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No". If you answer "Yes", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO X , I I 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm proVides in the regular course of business within the last five (5) years? YES NO X 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? I I YES NO X If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. 12/02/2011 Date f\ Gene R. Schriner, P.E. Print or Type Name and Title Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 79 1 1 , I 1 STATE OF FLORIDA ) I ) COUNTY OF Palm Beach ) ANTI-KICKBACK City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 ANTI-KICKBACK AFFIDAVIT I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. The foregoing instrument December , 20~, by of person], as President Craig A. Smith & Associates, Inc. executed] . AFFIX NOTARY STAMP HERE: A./'VVvvy, '5.~9.Y Pt.J. .f tl-~<1,l' Notary Public State of Florida .,..!I< . Amanda J Kidwell ~ ~ .'. i/ ~y Commission 00853842 .I "~o~ ,,0 Expires 01/25/2013 ~"""""~.A""""',;"""" By: {}f:w President <' Title: was acknowledged before me this 2nd Gene R. Schriner, P.E. [name of party on day of [name [type of authority], for behalf of whom instrument was Amanda J. Kidwell Print or Type Commissioned Name Personally Known X OR Produced Identification Type of Identification Produced Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 80 '1 , 1 , 1 F 1 I i r 1 I I I I ') h I ~ 1 t . J r 1 I . J I r 1 1 , I 1 1 , I r ..-" I f [ r 1; f. t 1"1 [', r ,..., ~~';-;~>:f?"--i~~~'''?}!tr.~~~",~~~~y~ \k \ Ii ";i .g ~ -to -:4i .f:W ~~ '? l' 'ii- ff{::, """1,,,,,,\ ~. Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 83 l"" -0 J ! rll ! J I II I 1 I t 1 I I ' 1 J I J I . 1 I I ',J I r 1 I L 1 ""....~~~ MPS3D, LLC is a Florida Limited Liability Corporation founded by the partners of Craig A. Smith & Associates, a 25 year old consulting engineering firm. MPS3D is the licensed provider of 3D Radar Tomography@ in the State of Florida. We are a full-service utility locating firm, incorporating state-of-the-art technology, such as 3D Radar Tomograph~ (RT)@, Arrayed Inductive Receiver Systems@, Soft Digs, and Acoustic Imaging & Tomography. MPS3D provides its clients with the most cost effective, non-destructive methods of establishing the location of geophysical features and conductive and non-conductive underground utilities, such as vitrified clay pipe, asbestos concrete pipe, fiber optic cable, PVC, PEC and HOPE. MPS3D is a highly mobile team of professionals, utilizing scalable data collection and image processing equipment, facilitating short-notice deployment throughout the continental U.S. Projects have been completed by multiple branches of the Company in Washington, D.C., Bronx, N.Y., across the Southeastern U.S. and extensively in the State of Florida. Our technicians and equipment provide the most comprehensive information available in today's environment. , 1 I I I, t i Unmarked gasline explosion Proposer: Craig A. Smith & Associates . , Responsibility Working with Federal, State and Municipal governments, our team of full-time lobbyists, engineers and industry professionals strive to advance the science of subsurface engineering to create the safest, most reliable technologies and processes. Our efforts include statements of best practices in subsurface utility location, as well as legislation related to damage prevention and public safety. We are advocates of controlled future development of a central repository of subsurface data. RFQ No. 11-11-02 84 r ,"',"'.,"'~ " f I i " 1 , , J I Vacuum Potholing I Soft Digs MPS3D is fully equipped to provide traditional vacuum excavation potholing (traditional SUE@) as both a stand-alone service and as a complimentary service to our other offerings. MPS3D utilizes traditional vacuum potholing to establish subsurface control elevations to improve the accuracy of Radar Tomograph~ and identify previously unknown facilities indicated via the Radar Tomograph~ imaging process. MPS3D's vacuum potholing equipment is highly mobile and deployable throughout the southeastern US. · 1 11 I 1 L I. .' MPS3D is active in local, state and national organizations promoting damage prevention and safety. MPS3D supports the efforts of Common Ground Alliance, the : National Utility Locating Contractors Association, Sunshine One Call of Florida and others. : L 2D Radar Imaging MPS3D maintains and deploys numerous ground penetrating radar (GPR) units for the detection, location and protection of I subsurface utilities. MPS3D staff and technicians have been extensively trained in the operation and interpretation of ground penetrating radar. Every MPS3D technician is well versed in radar theory and applications and has spent hundreds of hours studying and interpreting radar signals. ~ I ~...J ~....r--' ;.; iI1 !WI IWJ ~ !"" fli! .. MPS3D technicians perform extensive ground penetrating radar studies to identify and map subsurface utilities as a value added service for our Radar Tomography offerings. MPS3D strives to provide the end user, engineer, designer, planner or contractor with the most comprehensive level of subsurface data available. Proposer: Craig A. Smith & Associates RFQ No,11-11-02 85 r] j] .1 I i I , 1 ,I I I r 1 II I . 1 I'll r J I ; ,\}f. '?<~w,,", Radar Tomography Radar Tomography<ID can depict the continuous location and elevation of existing subsurface utilities. Interpolation between two spot dig elevations is no longer necessary. Variations in the horizontal and vertical placement of a buried facility can be very accurately depicted. Locations of fittings, bends and offsets are critical to the success of any design engineering or construction project.\ Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 ! A Witten Technologies creation, 3D Radar Tomography<ID, the future of utility locating, has the capability to \ locate utilities with a range of +/-4 inches accuracy. 3D Radar Tomography@ provides the Capabl\ity to "see" underground geophysicial anomalies, known and unknown features, boulders and buried bui ding foundations, for example. Traditional Subsurface Utility Engineering (SUE@), although functional, does not provide the most accurate or highest quality subsurface information to builders and designers, necessitating a degree of assumption and interpolaa tion. Radar TomographYW allows us to define continuous 3D location and direction of subsurface utilities. The future of this technology will allow the designer or contractor to reduce the potential for design changes, overall liability costs and claims exponentially. Radar Tomographyw and its inventor, Witten Technologies, received Florida's 2004 Governor's New Product Award as well as the NOVA Award for Product Innovation. Witten Technologies also received the 2004 Wall Street Journal Technology Innovation Award for Software and an Honorable Mention for the Overall Technology Innovation of 2004. Witten's Radar Tomography<ID, software and apparatuses are licensed to MPS3D, LLC. Like our above ground highways, our underground highways are already crowded and becoming more crowded daily. The need for accurate subsurface utility data grows exponentially with the population and our demand for services and conveniences. More water, sewer, gas, cable television, telephone, Internet and electricity installations, as well as upgrades to existing systems demand accurate utility information. Radar TomographfID offers a practical solution to this critical issue. 'I : ~ ~ I I r r I I r 86 The benefits extend well through the design process and into the final construction product. Through RT@, , 1 the designer begins with an extraordinary level of subsurface data from which the design is based. This saves valuable time in the design process and drastically reduces the need for excessive quantities of soft digs. The designer can "plan" for conflicts rather than addressing them after they occur. Soft digs can be r 1 specifically targeted to identify critical or previously unknown facilities. A study by Purdue University commisioned by The Federal Highway Administration (FHWA) indicates that r 1 typical subsurface utility engineering returns $4.62 on the backend of a project for every $1.00 spent on the front end. This equation was derived in 1999 and does not take RT@ into consideration. Recent Florida DOT projects have indicated an astonishing $12.00 to $1.00 return utilizing RT@. Projections indicate that ratio will , 1 grow substantially as utilization of RT@ expands. I 1 I' 1 I , A study by S.A.V.E., The Society of American Value Engineers, inidicates that $.14 of every , , construction $1 is waste.d because crews can't see beneath the surface they are working in. ! I ,. I FOOT has stated, "RT@ revealed numerous unknowns" and "Offers the ability to see the dimensions of existing manholes," In a conference discussion of FOOT Engineers, participants surmised that "RT@ can virtually eliminate 66% or more of vacuum soft digs for design." 3D Radar Tomographf>is revolutionizing the industry from every angle; planners can better I evaluate existing subsurface conditions and account for them; designers and engineers can create the most efficient plans for I implementation of the project facilities, and , contractors and construction crews are able to work in a safer, more reliable environment. .... "" Alan Lopez, President of Pinpoint Subsurface, I states, "Images and information obtained , through RT@ are a dramatic improvement over the data provided by soft digs alone. The time . savings afforded to the design team alone are well worth the cost of RT@, not to mention the potential savings in claims and change orders." ;'-1, -,- -- _::.-- ..J..'-~?'- .....- /3D Rendering of the layers _.......". -,- I 3D Radar Tomographf> is clearly the future of subsurface engineering. Contact MPS30 today for a detailed presentation on how RT@ can change the way you do business. See what we can uncover for your Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 87 r't I", <"", H;' ~- -;,} fP,'; ./~ ,~., . -, ;-'\' -):t~,;<;, t/:~." /fi ~ 'i( \.~, i."\-., " .?:."';X:'7:??~2",,,.~"t;}'~~~~~'aflr'ly.-':,~:i1 ?>~'''r':?1~~~~m:-ir';,';/''''~ ~,_.' ~q ~~' :<;~ Acoustic Imaging & Tomography r 1 '1 'I r 1 MPS3D, in conjunction with Witten Technologies, provides acoustic imaging and tomography services for specialized subsurface locating applications, primarily for submerged pipe installations. Acoustic services are employed for locating and mapping subaqueous cables and conduits, sub-bottom profiling and underground void detection such as sink holes or caverns. Acoustic imaging is accomplished through the deployment of highly sensitive receivers (microphones) in specific, geo-referenced arrangements, along with a sound or percussion source. The sound source is initiated and the receivers pick up the sound as it passes through, or is reflected off the object being 'I analyzed. The sound wave and its intensity is recorded at each of the receivers and is used to develop an image. The resulting image can be "sliced" to produce tomographic results. I I \ I The largest dinosaur remains found, and perhaps the largest dinosaur to ever live, the ~! seismosaurus, was located by WTI namesake and co-founder, Dr. Alan Witten using i; acoustic tomography anclmade famous in the opening scene of Jurassic Park. ,'..!' MPS3D is proud to partner with and display the Witten Technologies' seismosaurus. ,:' J MPS3D recently utilized acoustic tomography to detect and map subaqueous communications facilities prior to the " proposed dredging of a major inland waterway. The information obtained from the acoustic imagery helped to prevent potential exposure and damage to the communications facilities and aided in the placement of new facilities following dredging operations. I ,I Such facilities are, at best, difficult to locate. MPS3D and our technology partner, WTI, have the expertise your projects require. Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 88 fn,:;,~'4>'!'1' ~-~~} -m~>~q;p-~'W'Pt;~";::JS"--::-~~'~-:'?::-_"'-_._'-""-:'-_.~~_:--'-_.-:C~':"c'T~''''''''~'"'~~''-'-~'''~~-.:-'''''7'-:~' , 1'- " I ,','I-,_"T7.'"'" ....'7'"'.'_-~4't~:,:;:~:~_ /1' "f.' r 1 , ] Arrayed Inductive Receiver Systems MPS3D is the only firm licensed to deploy and provide Witten Technologies' proprietary A.I.R. System@ (Arrayed Inductive Receiver System@) facility locating solutions for deep and submerged pipe installations. < ] The AIR. System@ employs an arrangement of 48 electromagnetic channels to develop and produce a highly accurate, three-dimensional image of submerged or deeply buried pipe facilities. Such facilities must either be conductive or contain a conductive element such as a tracer wire, bonding wire or Cathodic protection grid. The A.I.R. System@ senses and maps the fluctuations in the magnetic field produced when a signal or current is induced over the facility or its conductive element. The AIR. System@ converts the resulting signals into an image form depicting an accurate horizontal and vertical representation of the facility's location. I I I 1 I A recent electric power transmission project in Florida avoided certain catastrophe by employing the A.I.R. System@ prior to directional drilling. An existing 16", 1 080psi high-pressure, trans-state gas delivery main directly in the drill path was located and avoided, saving lives and property. . , II r 1 The AI.R. System@ has mapped facilities 35' and more below the surface, through all types of soil and groundwater conditions, including groundwater with high salinity content (salt water). Critical facilities out of the effective range of ground penetrating radar and traditional electromagnetic instruments, and well beyond the effective reach of vacuum potholing, can now be located and mapped with never before realized accuracy. I I , J A recent study commissioned by the Office of Pipeline Safety, provided dramatic results and showcased the promise of future AIR. System@ location and mapping efforts. The technical staff of MPS3D is working closely with the R & D staff at Witten Technologies towards incorporating A.I.R. System@ capabilities into our next generation Radar Tomographylll> systems. The AIR. System@ is currently available as a stand-alone service and can compliment any of our other service offereings. Proposer: Craig A. Smith & Associates RFQ No. 11-11-02 89