Loading...
HomeMy WebLinkAboutSRS 1 ~ City of Sunny ~ Isles Beach ~ J J J ~ rJ Request for Qualifications for Civil Engineering Services to Design Street and Drainage Improvements -~:;i~:~, f::i~.,:'r:;:}'~:~,~'.;5"1 ~ ., .""", . ,," RFQ No. 11-11-02 O-r-(' r 'l' ,-",r, 1 ! .-t lUI. ' '- -' 'lv"h lJ,l-tt ~ i , IS3 r\M;.h I City of sunny I~ [ 'J'-"" , ! Offlca o1tr\c eny Ck3:~_~~~ ,....-----~_..-...-~ Submitted: December 2,2011 5001 SW 74TH DOURT, SUITE 201, MIAMI, FLORIDA 33155 TEL: 305-662-8887 FAX: 305-662-8858 WWW.SRS-DoRP.DOM E8-oooD7317 1 1 l l ~ ] ~] ~ ] ~ ] ~] : I I ~] I I f 1 , J November 3, 2011 City of Sunny Isles Beach Government Center City Clerk's Office 18070 Collins Avenue, First Floor Sunny Isles Beach, FL 33160 Re: Civil Engineering Services to Design Street and Drainage Improvements Request for Qualifications No. 11-11-02 Dear Selection Committee, We sincerely appreciate the opportunity to be considered for the above referenced contract and to acquaint you with our Team. The SRS Team is very familiar with the work to be performed as Roadway and Drainage Engineers to the City of Sunny Isles Beach and feel our Team is uniquely qualified to provide the services required. For this contract, we have carefully assembled a team of experienced professionals that will assure the City the full range of services and capabilities needed on its projects. Our team consists of the following local firms: , I I , I . SRS Engineering, Inc. (Prime/Civil/Environmental/CEI Engineering) . FR Aleman and Associates, Inc. (Land Surveying and Traffic Engineering) . Professional Service Industries; Inc. (PSI) (Geotechnical Engineering and Testing) SRS Engineering, Inc. (SRS) is a local consulting engineering firm dedicated to providing professional engineering and construction management services to local governments and municipalities, as well as the private sector. Our staff is a highly motivated, experienced group of professionals including engineers, designers, construction managers, field inspectors and support staff. SRS can offer the City of Sunny Isles Beach a broad spectrum of engineering services from investigation and feasibility reports to design, project management, construction administration, and construction observation. We have extensive experience in the design and construction management of roadway and drainage improvement projects. l J SRS has provided similar engineering services to several municipalities and local governments and we are currently under contract to provide continuous miscellaneous services to the City of Coral Gables, City of Hialeah, Naranja Lakes CRA, and the State of Florida Department of Military Affairs. We have been providing engineering services for over 15 years to municipalities and local governments. We have extensive experience providing miscellaneous services to municipalities. Recent projects include new roadways, drainage improvements, water and sewer pipelines and pumps stations, environmental studies, master planning, municipal buildings and parking areas, parks and recreational facilities, construction administration services and construction inspections. l j l J Relevant projects include the master planning and design of the water and sewer systems for the newly annexed area, the design of over 26 miles of local roadway and drainage improvement projects, a new fueling station for the City of Hialeah; construction management I , J 1 , J 1 rl Fl rl ~1 r 1 ~ I I ~ I I I ~.1 I ' November 3, 2011 Page 2 and inspection services for the City of Miami; and Master Consultant services to Miami-Dade County DERM, including the management of over 490 roadway and drainage improvement projects throughout the County. SRS Engineering is also an FDOT pre-qualified firm and familiar with FDOT LAP (ARRA) requirements. In accordance with LAP guidelines, we have recently completed the design of the W. 53rd Street Roadway Improvement Projects for the City of Hialeah. In addition, SRS is currently providing CEI services for several new LAP projects for the City of Hialeah and Coral Gables, including W. 4th Avenue, Ponce de Leon Boulevard, and the 1-75 Ramp/NW 138th Street project. In addition to our focus on excellence in design and service, our firm is guided by principals who understand that in order for the firm to succeed it must have satisfied clients. As a result, SRS's success is largely due to the principals' strong commitment to its clients and the quality of our work. Principals at SRS are involved in every aspect of the business from design and project management to employee recruitment. Project management and contract performance is personally directed by a principal who is thoroughly experienced, licensed professional engineer. This approach results in a very personalized service to every client with ease of communication and top talent on every assignment. The efforts of SRS' principals are complemented by experienced project engineers and talented professional staff that are adept at understanding clients' needs and work hard to deliver the results that clients want. , 1 , J Our Team will be led by Mr. Ignacio Serralta, P.E., who will serve as Principal-in-Charge. Mr. Serralta has over twenty-five years of experience in civil engineering planning, design, and management for a wide range of public works, site development, and infrastructure projects. Mr. Serralta will be personally overseeing the management of this contract and coordinating between the City and the SRS Team. I . I Our Senior Project Manager will be Mr. Oliverio Sanchez, P.E. Mr. Sanchez has over thirty- three years of experience in project 'management and engineering design for both public and private sectors. He has extensive experience in land development and site planning, water and sewer systems, municipal engineering, storm water management and drainage engineering, roadway engineering, construction management, field supervision, and quality control. Mr. Sanchez is very knowledgeable of local design standards and regulations and is very familiar with local plans processing and permit requirements. , 1 I I j , 1 , I Our Design Project Manager will be Mr. Jean-Claude Fontaneau, who has over fifteen years of experience in civil engineering design. He has been responsible for the planning and design of a variety of municipal and site development projects. Mr. Fontaneau is primarily responsible for the engineering design and preparation of plans and specifications including the design of pump stations, water and sanitary sewer pipelines, site development projects, roadway improvements, and storm drainage systems. Mr. Fontaneau was the project manager in charge of the design of several municipal projects including the approximately 26 miles of roadway and drainage improvement projects for the City of Hialeah, Miller Road Widening and several municipal site improvement projects including parks, marinas and community centers. . j . I Our Senior Structural Engineer, Ms. Gisela Rey, P.E., has over twenty-five years experience in the structural design of marine and civil structures including cruise terminals, docks, piers, seawalls, bollards, canal stabilization and breakwaters. Her responsibilities include structural design as well as the preparation of construction documents. Her most recent project experience includes the Miami Circle Seawall Replacement project, the Onyx Seawall Replacement project, and Berth 24, 28 and 29 at Port Everglades. r} ~l rl r1 r] ~l ~l ~ ] ~ ] I r I I l I I I ' I I l J November 3, 2011 Page 3 Our firm is further supported by an excellent group of consulting professional firms whose unique expertise and experience with similar municipal experience makes our group an exceptional team. Our combined strengths and capabilities will ensure this project's successful and timely completion. In addition to possessing the qualifications and experience required to meet the challenges of this project, we believe the following items make our team uniquely qualified: II Our Principals and knowledgeable staff have extensive experience in the design and construction management of municipal projects. The SRS Team has worked together on many similar projects and is very familiar with local regulatory agencies' requirements. We have no learning curve! II SRS is experienced in both engineering design, as well as, in construction administration and inspections. We have experience in the design and construction of municipal projects, including cost estimating, scheduling, inspections, and quality assurance. We "see" both sides of a project! iii The SRS Team can provide the same civil engineering professional and construction administration services as larger firms, but in a more responsive and cost-effective manner. When dealing with our Firm you will be dealing directly with Principals who have the experience and authority to respond effectively to your needs. You can count on us! We value our commitment to the City and if given the opportunity to continue to work for the City of Sunny Isles Beach, the SRS Team is committed to meeting its assignments, project requirements and schedules. Although we are not a large national firm, SRS has the capacity and resources needed to meet your needs. We are accustomed to designing and managing small, as well as, large and complex projects. What sets us apart is our commitment to principal involvement on every project. Our Principals and Project Manager understand the importance of exceeding our client's expectations and realize that the best way to stay in business is to serve your client. SRS is quite aware of this which is evident by our long list of continued clients. Give us the opportunity; we will exceed your expectations!!! , J Again, thanks for this opportunity to present ourselves. We are extremely interested in this assignment and we do look forward to working with the City of Sunny Isles Beach. , 1 l j . J ReSp~tfUIlY submitted, ~. ~ Igna90 Serralta, P.E. Pre$ident l J ,I " 1 " J 1 1 ~1 1 ~l 00 ~ :1 ~ ~l Q) ~ ~ 1 ~ 0 ~ ) U i : I ~ I I r J 0 II I , , I Q) . J I I ' I r ~ ~ . J I J I ~ I b J , J , J 1 ~,,)) ~ Company Information Qualifications I Staffing I Approach I I Methodology References I Office Location I Contract Forms I I ,J I ! ,1 I 1 1 1 ~l Fl ~l J : I ~ ) ~ ] ~ ] I ~ I ~ J . , lCompany InformCJtion II Name of Company: SRS Engineering, Inc. II Company Location(s): SRS Engineering, Inc. has one (1) location in Miami, Florida. . Internet Web Address: www.srs-corp.com . Details of Entity Business Structure: The Company is a Subchapter S Corporation. It is a Florida Corporation in good standing. II Date Founded: SRS Engineering, Inc. was founded on September 11, 1995. III Local Address: SRS Engineering, Inc. is located at : 5001 SW 74th. Court, Suite 201 Miami, FL 33155 II Telephone Number: (305) 662-8887 II Outstanding Litigation: SRS Engineering, Inc. has no outstanding litigation that would threaten the viability of the firm or adversely affect the performance of this contract. . Proof of Insurance: Proof of insurance is enclosed on the following page. II Ability to begin Services: SRS Engineering, Inc. is able to immediately implement services on this contract upon receiving authorization to begin. Our workload is currently relatively light and expect to complete current main projects within the next couple of months. I ' I d I L J l j , J l j r I , I J 1 1 ACORD CERTIFICATE OF LIABILITY INSURANCE I DAU1IMI.I-!lDlVYYYl '" 08/04/2011 I'ROOUC~1l (305)822-7800 FAX 305-362-2443 THIS CERTIFICATE IS ISSUED AS A PMTTER OF INFORMATION Coll illSI~OI.th, Altar, Fowlar & Fr'cllch LLC ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE ttOLDER. THIS CERTIFICATE DOES tlOT AMEND, EXTEND OR 8000 Governors SqllarQ Blvd. I Suite 301 ALTER THE COVERAGE AFfORDED BY THE POLICIES BELOW. Miami Lokes, FL 33016 lOI'aid" Gonzul ez Ext 159 zgonza1ez@caffllc.com INSURERS AFFORDING COVERAGE NAIC# ItI~UR(D SRS Engineering, Inc. ItlWRtR A: lIal'tford Casualty InsuranCQ Co A XV 29424 5001 SW 74th Court 11I~)I>;ER6; Travel aI's Casual ty & Surety Co A XV 19033 Suite 201 ItISl.~ER c: RLI Insurance Co. A+ XI Miami, FL 33155 11I"~flEA 0: ItlS\,fiERF.: COVERAGES "THE POLICIES OF INSURl.NCli I..ISTI;Q IlEI.OW HAVE OF-EN ISSUED TO THE INSJ,.IAEDNAMED AllOVE FOR 1HE POLICY PERIOl) INDICATED. NOTVllTHSfANOI~(l III-N REQUIREMENT, 1ERM OR CONDmOU OF ANY CONTRACT OR OTHER DOCUMiiNT WITH RESPECT 10 WHICH THIS CElnFICATE MAY BE ISSUED OR ,.,,,y PERT A1t4. TilE INSURANCE AFrORDED BY TIlE POLICIES OESCRIOED IIERE;N IS SUBJECT TO ALL TfjE TERMS, EXCLUSIONS NIO CONDITKlNS 01' SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID ClAIMS. Itl!lft DO' TYPE OF IJlgURmeE PllLlCY IIUII.UII rO~lo.Ur.~~~,1!:ve I PO~ICY n~lno\TI~II LIt.tJTa ceNSRA.L LIADlutY 21SBAT04453 03/04/2011 03/04/2012 rACII OCCt.MCNCC $ l,OOO,OO~ ~ CC\W.IEI'l;)IAJ,. OEUEAAL 1I1<6~1lY O~-,.v,OE TO REN'TED $ lOO,OOC ~b CLNMS IJo\Oo []J occun MEO CXP (o\m ono ",..on' $ lO,OO~ ^ ffnWIMl &J..OV IUJUfI( $ 1.000 ooe - 2,OOO,00e - OttlEP.Al AOOflWATE S Otll1. AOORCOATC liMIT J.I'l'urs ren, mODUCTG . COMPiOP AGO $ 2.000 ooe XlI'OLK;V n ~ n LOC ~TO/.f09ILE LlADlI.lTY CO/AEI/lEO &'AGl F.. liMIT 5 NIYAl.JTO <F.HOOO~'r,J .-...-.... - All O'fI.'JW"'UTOS snDIl Y Ill).iF.Y Cr., p_~~ $ ~CH(DUL[O AUTOS - Ijl~.l:O AUIOS eoOlY Ilt\liH - $ NONOWUEO I.UTOS (1'., ><<ld'"11 - - -......--- rnOPEflTY I>IIMJ..OE $ (1'., .,--<Id,nll Q/,R,l,OE llAnlllTY AUTO Olll V .ItA ,o,::OD"tlT $ R 1.lf( AUTO OTHER 111.\\/ E"'ACC $ - AUTO aUl V: AGO $ t:rSi> UAlnAELL,l, UA~ILlTY EACH OCCIJF AEr<<:e $ OCCUR 0 ClA1'J5 l'J,OE '.~ORIiOATE $ $ H DEDUDlIBLF. 5 RETENTIO!-I $ $ \'IOflKfRS CO\lPEIiS'" 11011 olliO UB3294TlO8 01l/21/l011 08/21/2012 XJ;WG:;'AfU~LJ~TH' _ .JCflY,LII1JIS .en. VMPLOVEflS'lIABllITV E l, E"-Cll AC:IOEIJT S ---1.,OOO.,QQ9 B ~IlY HIOAA{JOR'PAHIIJ~v."XECUI rvI, O~f ~f\'MF.IlBF.R ElO:;lLtJED1 YES El. OSEA$f. €" wr1.OYt[ S 1 OOO,OO~ ~~~8I1~~~~~g tdllM' EU~SEASE.PlXICHt'JIT S 1,000,000 p~THrc . 1 L' b'l' ROPOOOH16 01/10/2011 01/10/2012 $1,>000,000 Each C1 aim ro CSSlona ,n, lty C C1 aims-~i'~C Form $1,000,000 Annual ^"grcgatc Ratro: 12 20/96 SZS.OOO Deductible (}{$e~IP1'Otl OP ()Pl!Jt~ltOII5J lor-...Allom:; 1\'~'.Cl~S' EMCLU:a;JliS ADDEO BV ElmORSEMErlr.r 5PEClAl PRO'IiSIOIJS 1 1 fl ~1 ~) ~ ] ~ ) I ~ 1 I I ~) I ~ I , I I J , I l j 1 l J l J "SPECIMEN" CA ELL 5}!OUlO "'IY Of 111 Ii AGO"" on.r;OIIlED I'OllC11!S Il" eMICoUED llEfO"e THe EXFfIlAnOIl PATE THEn;;Of. THE rSs~II(l"lSuIIER \'~Ll EltOf,l,VOA TO '.\All JL DAYS \'mITTEN IlOllCE 10 1HE CfRlIFr..ATE HOLDElIllAP.lfO TI) THE lEFT, PUT FAILURE TO "'All Buell II011<:E GJIAU WOlle lIO OBLlOo\JIOII on L1MlllITV OF AIIV ttrJD UPOlllHE ItISIIRER, ITa "OElITS 011 REfRESEtITATrit:s, AUTHORIZED REPRESEHTAlII'E.. <1~J2 ''-.1.-# A..-7 ~ R'F;::~~~#O"-4f'pr.~)l,jI ~'eade Coll illS\mrth/ANGIE , I I ACORD 25 (2001l00} o@AconOCORPORATION 1908 ~ J f I l J I c J ~l l II r l i~'- 10 I ~l ~ ~ 1 ~I .Q r] I~t:~f~ y 0 l "t~ j; J@ ;;,~ r 1 f 1 I r I . J i I I '\" , I ::J ::J ::J ::J ro ro ro ro <ll <ll <ll <ll c: c: c: c: . ro ro ro ro ] N N NC NC NC N N~ N C <ll <ll <ll 0 <ll 0 <ll 0 <ll Q) "jjj <ll 0 '" I .e c: .e c: .ell. .ell. .ell. .e c: (OTIC!) .e c: 11. ro U 0 U 0 g <ll N '" g <ll N '" g cu ~ 0 '" U 0 U 0 -'" I I c: U 0 c: U 0 o <ll o <ll <ll c: U Uc:", c: U 0 <ll ~ ~ ~ rom+-' rom+-' rouc- roUc- m-gc+-'Cij 8l~ ~~.g rom+-' U ~ u..~ (/) 11. .!!1 CIJ ~ :J ~ CI) ~ :J ~ en m :J.~ I..... ~ LL .:g ::J ro .- I ro u.U II~ ,g ~ 0: 0-:2; 0 0-:2;0 ,go:2;O:~ .~ ~ ~.g 8 C3 <ll 'cl~ ~ 'C U ?; :2; 'C U :2; 'C ~~ ~:2; 1 ~.~ ~ .~ ~ ~ ~ffi~~ g; c: ~x g; c: ~Q) x I~.~ fij ~.~ ~ c: > x > ~ I1l o~~~ o ~ ~ ~ ~I =(0 <ll <ll I 0:2;5= 0:2;5= O~O<( 0:2; a::o~ 0:2;5= <ll (;5<( J ..., I , I I I U '" :u c: '" >- ,Q <ll <ll ro ..... '~ (!) t U (;5 ..... <ll C t c: (/) <ll ro ~ c5 W E c: <ll (") <ll C ::J '<t () I a. Ig ro 'm c5 c: ~1ii :2; U ;'! '0 I1l c: :2; <ll- l J '" ro {'! o(/) -'" '" ..f c: ",t:: ~ 0 C (!) ::J 0 c: '" U QJ ~ <ll 0 <ll 'iji E a:: 2 ;: ::J ro Z .2 U g; '" '" U 1;; ~(/) :0 ~ 0 <ll c: c: c: O/lc ::J ~ ,~ 0 <ll I1l 0 a. ~ :;::; '" 0> U QJ ~ '. J .e 'E E .l'! I1l @ ~ U a. (/).e rot:: ro '" I1l QJ ~~ ~ s~ <ll <ll u: ;: a. U co ~ , ~ Q) <ll '" .e <ll <ll ::J '" '" roO 'E '0 -'" (/) a. 5 [l:' ::J <ll -'" "*g I1l I1l :u (!) 0 OU (;5 0 I1l ~ 11. a. N a:: J: ...J I '~ , ~ (/)U .<: U I1l , J QJ .<: c: .<: ~ fij '5 I1l 0 I1l m ~ c: ..... <ll .e o c: ~ .0 <ll U <ll (") I1l f:: 'g <ll ro <ll ro 0:2 s: I1l :u I (} :::; I (/) I :2; co J: Z UW , I , J ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 '" '" 0 0 '" 0 0 '" 0 0 0 0 '" '" ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 0 ~ 0 0 '" 0 0 '" 0 0 0 0 '" ~ '" ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ 0 '" '" '" '" '" 0 0 0 0 '" '" ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ '" '" '" 0 ~ '" '" ~ '" 0 0 0 0 '" ~ '" '" ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ '" 0 0 0 0 ~ '" 0 ~ 0 0 0 0 '" '" <'l '" '" '" ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 0 '" 0 0 '" 0 0 ~ 0 0 0 0 <'l ... '" <'l <D ... ... <'l ~ ~ '" ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 '" 0 0 0 '" 0 0 0 0 0 0 0 <'l .... .... ... <D 0) 01 .... '" ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~I~ ~ ~ ~ ~ 0 '" 0 0 0 '" 0 0 0 0 0 <'l 0) .... ... '" 0) <D '" '" ~ ~ ~ ~ ::J I1l <ll c: I1l ~ N C '" ro <ll 0 'Qj ~ .<:11. (IJ N 5 ro (/) g <ll '" -'" UoU o <ll <ll ro '" 0 QJ roU ~cm :ffi~ Iii [;l .~ .Q ~ (/) (/)::J <ll::Ju. I1l 0.:2;", ~ 0 a:: 11. ~ro"5 0 .g [) 0.:2; ro c: '0 .~ ffi ~m~ Q) x - <ll :2;()J: ro <ll > ~ ~.~ 1.2 ~~~ c: <ll '" <ll - <ll 5=<( 0(;5 0..., ~...,...J , ; : , , I@ , i , : , , 1 l l 13;4 ~::t ~~ l::t ~ [I't:l ~ ~{ll'J II] I ~ [~'i::t ~l'J [I't ~"IIII'j llJ ~ I [I't I :1~'...1 =1:"~' ~II..: 1:1 ;,lIJ:J. [~'i:(~ 1(1] ~~ ~l SRS Engineering, Inc. has had the opportunity to serve several local municipalities and governmental agencies as consulting engineers, designing roadways, drainage systems, water and sewer pipelines, pump stations, parks, and provided construction management and inspection services on many more projects. SRS is currently under contract to provide Miscellaneous Engineering Services to the City of Coral Gables, Hialeah, the Department of Military Affairs, and the Naranja Lakes CRA. l ~) We have also provided various Civil Engineering services to the following governmental agencies: . City of Coral Gables, Public Works Department . City of Hialeah, Streets Department II City of Hialeah, Water & Sewer Department .. City of Hialeah Gardens . City of Homestead . City of Florida City .. City of Miami, Department of Capital Improvements . City of North Miami Seach . City of South Miami . City of Sweetwater . Florida Department of Transportation . Florida International University . Florida Memorial University . Homestead Air Reserve Sase . Monroe County . South Florida Water Management District . State of Florida Department of Management Services . State of Florida Department of Military Affairs . U.S. Department of Labor . Village of Sal Harbour . Miami-Dade County Public Schools . Miami-Dade County · Miami-Dade County Aviation Department · Miami-Dade County DERM · Miami-Dade County Fire Rescue Department · Miami-Dade County Housing Authority · Miami-Dade County Parks & Recreation Department · Miami-Dade County Performing Arts Center · Miami-Dade County Police Department · Miami-Dade County Water & Sewer Department l : 1 ~ ] : 1 ~ 1 ~ 1 I I l J l J l J SRS has provided Construction Engineering and Inspection Services to the following governmental agencies: I I II . II . II . Naranja Lakes Community Development Agency Miami-Dade County Office of Capital Improvements Miami-Dade County Department of Environmental Resource Management City of Miami Office of Capital Improvements City of Hialeah City of Coral Gables ~ J I I MIAMI.BE mm I , J l 1 rl rl ~l rl l :1 ~ ] ~ I I&:h"i [Ci ~. :':4 ~:I;:~ 1:1 ~ [It :a~j II.: I;:~:tl!l ~~ :::r~, _ [e] ~ ,~, .,.;]~ 'II im li ~t1.] :t'~:t .I]:.J \'J I:I~..:.J ;:{.lIJ::(1tI f:i SRS Engineering, Inc. has designed many recreational projects for local parks and for private developments. Our experience includes a multi-year consulting contract with Miami-Dade Parks and Recreation Department providing engineering design and construction management services. The following is a list of parks and recreational projects we have completed. These projects include several walkways/trails and bike paths, trail bridge, access roads, site development including clubhouses, restrooms, park facility buildings, picnic areas, an equestrian center with equestrian trails, canoe ramps, playgrounds, parking areas, water and sewer improvements, drainage improvements and marinas. All together, we have designed over 22 park and recreational projects. On most of these projects our task included the planning of site improvements including laying out of park facilities such as park administration and maintenance buildings, parking lots, access roads, field drainage improvements, water and sewer systems, sewer pump stations, and various walkways and bike paths. Our scope of work included the project management, coordinating the work with all the subconsultants, design and preparation of construction documents, specifications, preparation of construction cost estimates, permitting through the various regulatory agencies and departments, bid phase services including conducting pre-bid meeting and review of bids; and construction phase services which included conducting site inspections, responding to RFI's and review of shop drawing, and final close out. PARK PROJECTS . Crandon Park Marina and Golf Course - Miami-Dade County . Palmetto Golf Course - Miami-Dade County . Miller lakes Park - Miami-Dade County a Matheson Hammock Marina - City of Coral Gables . Three lakes Park - Miami-Dade County . North Trail Park - Miami-Dade County . Martin L. King Park - City of Miami . Reach Park - Miami-Dade County . Deerwood Park - Miami-Dade County a Miller lakes Park - Miami-Dade County . Eureka Villas Park - Miami-Dade County . Eureka Park - Miami-Dade County II Casas Park - City of Hialeah . Southern Estates Park - Miami-Dade County . Spanish lakes Park - Miami-Dade County . Virrick Park - City of Miami . A.D. Barnes Park - Miami-Dade County a Chapman Field Park - Miami-Dade County . Kendall Indian Hammocks Park - Miami-Dade County . Tropical Park Equestrian Center - Miami-Dade County . Riviera Park - City of Coral Gables . Salvador Park - City of Coral Gables , 1 I l J ~ I r I l J 1 l J I ,I L J 1 1 ~l rl 1 ~1 l : 1 I : I I r 1 ; l J L=!:4 ~::I:~ 1::1 ~ [It :I'j'j _.: I' ..-II} .I.~' :II:.' ~~ =f:.lI ~ ~{.~J:[1tI ~ SRS Engineering is a FOOT pre-qualified firm to perform engineering services. We are very familiar with FOOT LAP (ARRA) requirements. SRS has recently completed the design of W. 53rd Street Roadway Improvement Project for the City of Hialeah in accordance with the ARRNLAP guidelines. In addition, SRS is currently providing CEI services for several new LAP/ARRA pro~ects for the City of Hialeah and Coral Gables. These projects include the 1-75 Ramp/NW 138th Street, W. 4\ Avenue, and Ponce de Leon Boulevard. II] ~'i Ie) ~. :t:4 ~:l ~~ l:l ~ [It :&IilJ..: I III'':'' ~~ I ~ I ~"tI. ~~ I Iii IIJ ~~ ~...:., ~ III :J ~~ I lIe) ~ SRS has recently completed work on two bridge projects, Black Creek Bridge and the Access Road and Bike Path Bridge for Chapman Field Park. The Chapman Field Park Bridge consisted of a 21-ft wide bridge over a water crossing for canoes. In addition, our senior project manager and structural engineer have extensive experience in design of port and marine structures including docks, fender systems, harbor crane supports, wharf extensions, mega cruise ship terminals. Among the projects they worked on include the following: Berth 24 Extension, Port Everglades, Florida - Design and construction document preparation of 500 feet length of HZ combined wall system to extend the effective length of an existing pier in order to accommodate a new cruise ship. The project included the addition of four 150 ton bollards and fender systems. Berth 28 and 29, Port Everglades, Florida - Structural analysis for HMK-260E mobile container crane operation. Structural analysis to determine the feasibility of operating mobile harbor cranes HMK-260E at Berths 28 and 29. r 1 III I I r 1 I : ~ Disney Cruise Line Resort Island, Bahamas - Part of the team responsible for the structural calculations, construction document preparation and shop drawing review for this project which included a marginal wharf, the creation of an artificial berth island, a protective breakwater, a steel bridge and several fixed timber docks and platforms for recreational activities. Onyx Seawall Replacement, Miami, Florida - Replacement of more than 200 feet of existing seawall with a new sheetpiling wall for a new high rise building. Responsibilities included design, and construction document preparation. , I , J Cypress Club, Ft Meyers, Florida - Private marina for two high rise residential buildings, with 520 feet of sheetpiling seawall and walkways, including breakwaters and piers to accommodate 70 boats from 30 to 56 feet length. Responsibilities included structural calculation, design, construction document preparation and dredging evaluation. , I LJ l J , J , J I \. J Miami Circle Seawall Replacement, Miami, Florida Replacement of more than 540 feet of a partially collapsed seawall with a new sheetpiling wall at Archeological Tequesta Circle in Miami River. Responsibilities included design and construction document preparation. NW 138th Street Roadway Improvement, Hialeah, Florida - Design of over 700 linear feet of concrete pile and panel canal wall. ~~~~~r:l~[~:l"'J..:.~{'J".lW:'\..:"~I...~~):"I~J~:il . . . 1 l 1 '1 rl ~l l ~ 1 i ~ J I I I : J I 'J SRS has extensive experience in the design and construction management of roadway projects. SRS has designed roadways of several municipalities, Miami-Dade County and many private land development projects. Our most recent relevant project experience encompass several roadway and drainage improvement projects for the City of Hialeah totaling over 26-miles of roadways including E. 9th Avenue, S.E. 7th Avenue, W. 23rd Street and W. 36th Avenue (NW 97th Avenue). Other roadway projects include the design of the Miller Drive (SW 56th Street) widening, the extension of SW 120th Street, the widening of NW 138th Street and adjacent canal, and the entrance to Florida Memorial University. NW 138th Street, in particular, is currently under construction with a construction cost of over $12,450,000. This roadway project consisted a of 6-lane divided roadway including continuous drainage system and street lighting (1.4 Miles); signalized intersections at NW 97th Avenue, NW 102nd Avenue, and NW 107th Avenue with double left turns and deceleration lanes; new 50' wide drainage canal including culverts and a canal wall along the north side of NW 138th Street between NW 97th Avenue and 1-75. This project also required an extensive permitting including City permits with Hialeah, Hialeah Gardens, Miami-Dade County, DERM, FOOT, SFWMD, COE, and DEP. An Environmental Resources Permit (ERP) was required, cut and fill calculations, and wetland mitigation. , 1 In addition to our municipal roadway design experience, SRS has planned and designed over 550-acres land developments projects within Miami-Dade County which included the design of all roadways and storm water management systems. Furthermore, an example our ability of manage large and complex project, SRS was the program manager (Master Consultant) for the DERM FEMAlDORM Program. The FEMAlDORM project is a jointly funded effort supported by the Federal Government, State of Florida, and Miami-Dade County intended to mitigate problems that arose as a result of Hurricane Irene (October 1999) and the "No Name Storm" (October 2000). As a Master Consultant we were responsible for the coordination of twelve (12) engineering design consultants and seven (7) land surveying firms involved in the design of approximately four hundred ninety (490) mitigation projects. These projects range from drainage improvements to total roadway reconstruction, canal dredging, culvert cleaning, and canal bank restoration. Additionally, we oversaw the construction efforts of five (5) contractors performing work with an estimated construction value of $35,000,000.00. Finally we were responsible for all document control related to these projects, approval of payment for design, survey, geotechnical reports, and construction in accordance with FEMA required guidelines. · I . J , I L I I I J I I I I l J 1 1 1 rl ~l ~l 1 :1 ~ 1 r I L J f 1 l J , 1 , 1 r \ l J f \ I l I I J J l , L J \. ) _~~:~I:m~ I . . WITH :iU::f~IIf~'~II] SRS is one of the top south Florida land development design firms. We have been the engineers on over 47 large land development projects within Miami-Dade, Broward, and St. Lucie Counties. Our firm provides full land development services from initial due diligence and feasibility studies to complete design all site improvement including roadways, drainage systems, stormwater management, lakes, canal, water and sewer systems, pump station, cut and fill studies, and all associated permitting. Among our recent projects include the following: Kendall Commons - SRS prepared all civil engineering design plans and specifications for the construction of an approximately 160-acre traditional neighborhood district development comprised of 1,256 residential units, including townhouses, single family homes, live/work units, lofts, and flats; as well as over 132,000 sq. ft. of commercial retail, 15-ac lake, and a 9-acre school. SRS services included the civil design of a regional sewer pump station (wet well/dry well) as well as on-site roadway, paving and grading, drainage and storm water management systems, water and sewer systems, design of off-site water and sewer systems and roadway improvements to SW 16th Avenue and Kendall Drive. Other services included contracting and coordinating all topographical surveys and geotechnical investigations; all environmental studies including wetland mitigation reports and preparation of ERP permit. Permitting included all applicable regulatory agencies including FOOT, SFWMD, CaE, DERM, MDWASD, MDPWD, FIRE, and Health Dept. Century Prestige - a :t96-acre development north of Miami Lakes and south of the Broward line off of 1-75. This project is comprised of 402 single-family homes with a 5-acre lake and 3- acre marsh wetland with a tree island Bluewaters - 80-acre mix-use Single Family/Townhouse development located south of SW 240th Street between the Florida Turnpike and SW 112th Avenue in southwest Miami- Dade Hialeah Palms - 114-acre multi-use urban design neighborhood comprised of 933 residential units, including multifamily, townhouses, and single family homes; as well as 9.5-ac wetland and a 5.8-acres of parks and green areas in Hialeah Annex Area. Coral Keys Homes - 44-acre Multi-family/townhome development comprised of 614 townhouse units. The project is locate north of E. Palm Drive (SW 344th St.) and SW 172nd Avenue in Florida City. SRS services included the civil design of all on-site roadways, paving and grading, drainage and storm water management systems, on-site lake and wetlands, on-site water and sewer systems, design of off-site water and sewer systems and design of SW 172nd Avenue roadway between Palm Drive and NW 7'h Street. Other services included contracting and coordinating all topographical surveys and geotechnical investigations; all environmental studies including wetland mitigation reports and preparation of ERP permit. i I ~-'-~._m-"--_._::.. !m >U't< l l l ~l ~l Fl ~;4:,J ~;:~ I ~~[~ ::a','~..: IW~'. ~ ;:~'1II:,J:,J .....~'~I.:aW~l-"l. ::tW~'. :i;:~ Master plans of water and sanitary sewer systems, hydraulic network analysis by computer, sanitary sewer collection and transmission systems including forces mains and gravity systems, water distribution and transmission systems, pump stations, wells, water treatment plants and special structures. l ~ 1 ~ ] Hialeah Annex Water and Sewer Systems and Master Plan - This work included the preparation of a water and sewer master plan for the area in order to determine the current and future service needs and the size and location/alignment of water and sewer main lines needed along the major arterial roadways. It also included the design of an 8.06 MGD regional sewer pump station with backup generator with sufficient capacity to serve the entire annexed and adjacent areas. Additional work included the design of approximately 1,480 LF of 24-inch gravity sanitary sewer mains, approximately 10,724 LF of 24-inch ii~~~~~j ~;f~~f.~~~~:~~~:~~~~~:i~~l~~S::;e; ( 1 I' J , 1 l J I :t:4:,J ~;:~ I ~ ~ [~:I:,J ;:{el'J I.] I ~ [e'l:l{e] ~ ~"l.;:~ 1 [Ii. [I] ~ II'l r~' ~ r~lej ~ I'll ~ ~. .~, ~ 1."'1II:,J ;l:1];:~ ~'i ~ ;:t'J [~~ _ J In addition to our firm's vast experience designing local roadway and site/land improvement projects, our firm also specializes in providing municipalities with construction administration support services and construction engineering inspection (CEI) services. Our most recent relevant experience includes several roadway and drainage improvement projects/contracts for Miami-Dade County Public Works, DERM, City of Miami, City of Hialeah, and as Construction Consultants to the Naranja Lakes CRA. Among these projects were the NW 3rd Street and SW 69th Street Storm Sewer Projects for the City of Miami Office of Capital Improvements which had a combined construction cost of $2.3 million in roadway restorations, Pinehurst Storm Sewer Retrofitting Project which included roadway restoration and drainage improvements with a construction cost of $1.6 million and Avalon Storm Sewer Project which includes both roadway restoration and drainage improvements and has an estimated construction cost of over $3 million. Recently, our has been contracted to provide CEI services to several FDOT ARRA (LAP) projects for the City of Hialeah and Coral Gables. I (1 L J r I , J ,I . J , J , J .. J 1 1 1 1 ~] ~l l ~ 1 ~ ] ! :] I PROJECT NAME: Various Hialeah Roadway Projects CLIENT'S NAME: City of Hialeah Streets Department Mr. Jorge Hernandez (305) 687-2611 TYPE OF FACILITY OR SERVICES: Hialeah Roadway and Drainage Improvements SRS PROJECT FEE: $3,618,168 COMPLETION DATE: 2001 thru 20010 I r 1 l 1 KEY INDIVIDUALS Ignacio Serralta, P,E, INVOLVED: Oliverio Sanchez, P.E. Jean-Claude Fontaneau PROJECT DESCRIPTION: SRS provided engineering design, preparation of construction documents, permitting assistance, and pre-construction phase support services to the City of Hialeah for the reconstruction of over 26 miles of existing roadways, including the preparation of designs for the construction of drainage improvements associated with the roadway reconstruction. Our work included meeting with City of Hialeah staff and local regulatory agencies to establish design guidelines, conduct a utility search and identification of existing utilities, existing traffic controls, and review roadway design standards, We also designed and prepared the construction documents for the project. This work included the preparation of summary of quantities, signage and marking plans, signage and marking quantities, MOT plan, specifications, and engineer's estimate of probable construction cost. SRS also performed pre-construction support services, which included attending pre-bid meeting, responding to pre-bid request of information, and review of bids, This also included providing supplemental information and/or clarification of construction documents to prospective bidders during the bid solicitation process, review bid submittals, attend bid- opening meeting, and provide construction inspections as needed, (SRS was Prime Consultant) , I Id r 1 I J f I I " J . J l J l J l J , J 1 1 rl ~l ~l ~ ] ] ~ I I r.] I : : ) J PROJECT NAME: NW 138th Street CLIENT'S NAME: City of Hialeah Streets Department Mr. Jorge Hernandez 305-687-2611 TYPE OF FACILITY OR SERVICES: Roadway & Drainage Improvements NW 138th Street Widening SRS PROJECT FEE: $417,374 COMPLETION DATE: March 2007 to December 2008 KEY INDIVIDUALS INVOLVED: Ignacio Serralta, P,E, Oliverio Sanchez, p, E. Jean-Claude Fontaneau PROJECT DESCRIPTION: r 1 , J SRS was responsible for the engineering design, preparation of construction documents, plans permitting (Miami-Dade County Public Works, DERM, SFWMD, & FDOT), pre-construction phase support services to the City of Hialeah for the construction of NW 138th Street between 1-75 and N.W. 10ih Avenue. The work includes the preparation of designs for the construction of drainage improvements, street lighting and signalization, together with the design of a new 50' wide canal includin~ culverts and a canal wall along the north side of NW 138 h Street between NW 9ih Avenue and 1-75. The new design includes a 6-lane divided roadway, double left turns and deceleration lanes, and signalized intersections at NW 9ih Avenue, NW 102nd Avenue, and NW 10ih Avenue. Estimated Construction Cost $12,450,000. , 1 L 1 L J ( I l J Construction administration support and inspection services during the construction including review shop drawings, respond to RFls, review payment request, conduct periodic inspections, and engineer certifications L J L J , I , J I I , J 1 1 rl 1 ~l ] l ~ I I ~] ! ') I l : J PROJECT NAME: Chapman Field Park New Pedestrian/Bike Paths and Parking Lot CLIENT'S NAME: Miami-Dade County Park & Recreation Department Ms. Lydia Salas TYPE OF FACILITY OR SERVICES: Pedestrian/Bike Path, Access Road, Canoe Ramp, and Parking Lot SRS PROJECT FEE: $55,818 COMPLETION DATE: September 2011 KEY INDIVIDUALS INVOLVED: Ignacio Serralta, P,E, Oliverio Sanchez, P.E. Jean-Claude Fontaneau PROJECT DESCRIPTION: , I l I SRS provided the engineering design, permitting and construction phase services of a pedestrian/bike path, access road, parking area, and canoe ramp. The project is located within Chapman Field Park from Old Cutler Road to approximately 3f4 mile east into the park. The work included the geometric design of the pedestrian/bike paths and parking lot, design site paving, grading, and drainage plans. Coordinating the work with other subconsultants including Surveyors, Geotechnical, Structural Engineers and environmental consultants. Our scope of work also included preparing and submitting permit applications and construction plans for "dry-run" and "final" review by local regulatory agencies including Miami-Dade County Building Department, Miami-Dade Public Works Dept., and DERM; as well as, Environment Resources Permit (ERP) for costal construction and impacts to wetlands and mangroves, , 1 l J l J ~ , j Construction Phase services included weekly construction meetings, reviewing shop drawings, responding to RFI's, providing periodic construction observations, and preparing close- out documents. , J .. J 1 1 ~l ~l 1 ~l 1 ~ ) I :]1 I , ~ ] I II ,I ~ ] PROJECT NAME: FEMAjDORM CLIENT'S NAME: Miami-Dade County DERM Mr, Dorian Valdes TYPE OF FACILITY OR SERVICES: FEMAjDORM Project Master Consultant SRS PROJECT FEE: $4,500,000 COMPLETION DATE: December 2005 KEY INDIVIDUALS INVOLVED: Ignacio Serralta, P.E. PROJECT DESCRIPTION: , I SRS has performed as a Master Consultant for this FEMAjDORM program since November of 2001. The FEMAjDORM project is a jointly funded effort supported by the Federal Government, State of Florida, and Miami-Dade County intended to mitigate problems that arose as a result of Hurricane Irene (October 1999) and the "No Name Storm" (October 2000), As a Master Consultant we are responsible for the coordination of approximately twelve (12) engineering design consultants, eight (8) geotechnical firms and nine (9) land surveying firms involved in the design of approximately four hundred ninety (490) mitigation projects. These projects range from drainage improvements to total roadway reconstruction, canal dredging, culvert cleaning, and canal bank restoration. Additionally, we oversee the construction efforts of nine (9) contractors performing work with an estimated construction value of $35,000,000.00, Finally we are responsible for all document control related to these projects, approval of payment for design, survey, geotechnical reports, and construction in accordance with FEMA required guidelines. l J LJ I I L 1 , j I I ,J ~ERM Dt:....,_..., 1M' ......,._.Jl"I'U ...OUItCll......."o......,. 1 1 1 PROJECT NAME: Friedland Manor Drainage Systems Improvements and Retention Area '1 ~l ~1 CLIENT'S NAME: City of Florida City Mr, Pedro Gonzalez, PE TYPE OF FACILITY OR SERVICES: Civil Engineering Design of drainage pipeline and retention area SRS PROJECT FEE: $37,500.00 1 COMPLETION DATE: 2009 ~ I KEY INDIVIDUALS INVOLVED: Ignacio Serralta, P.E. Oliverio Sanchez, P.E. Jean-Claude Fontaneau Marilys Falcon ~ } I ~ I PROJECT DESCRIPTION: The purpose of this project was to provide storm water retention for the drainage relief system of the Friedland Manor neighborhood in Florida City. The proposed retention area is connected to an existing pumping system inside the Friedland Manor area via a 30" diameter storm sewer pipe. , 1 " J I , 1 I l I SRS conducted the storm water conveyance and retention basin modeling, prepare construction documents and assisted the City in obtaining environmental permits for the Project. , I , J The project included the design of a 10-acre dry retention basin, inlet structure with energy dissipation features, a water level control devise with wireless remote pump controls and solar/battery capabilities, and seepage trenches for storm water relief. In addition 1,200 LF of 30" diameter storm sewer pipe and 2,180 LF of unpaved access road were designed for this project. ( 1 l j l j , J The Project was permitted through South Florida Water Management District and Miami-Dade County D.E.R.M. in conjunction with the City of Florida City, ~ J , l J , J -fOR ENERGY DISSlPATOR DETAILS. SEE SHEET C-14 o STI\. 13+44.52 0 13.20' LT. PROP. JO" -22.5' BEND WITI-I CONe. THRUST BLOCK ST.... 115+ 78.65 0 14.08' LT. PROP. JO"-45' BEND WllH CONC. lHRUST BLOCK WT. ElEV.- J. 12.62' kJ 10.80' 12.00' 1 1 1 rl rl ~l l ~ I ~ 1 I ! : I I . 1 ItJ PROJECT NAME: County-wide Construction Inspection Services CLIENT'S NAME: Miami-Dade County Public Works and DERM Antonio Cotarelo, P,E, 305-375-1918 TYPE OF FACILITY OR SERVICES: Construction Inspection Services of Roadways and Drainage Systems SRS PROJECT FEE: $745,000 COMPLETION DATE: August 2006 to October 2007 KEY INDIVIDUALS INVOLVED: Ignacio Serralta, P,E, Oliverio Sanchez. P.E. Juan Castro Thomas Ferguson PROJECT DESCRIPTION: ~ ] Construction Inspection Services Project for Miami-Dade County (Public Works and DERM) beginning in May of 2006 through October of 2007, We were responsible for supplying engineering and construction inspection services to the County, as needed, on its roadway and drainage improvement construction projects, We were responsible for providing and supervising six (6) full-time on-site construction inspectors and one (1) supervisor for the duration of the construction. The construction projects consisted mostly of roadway reconstruction and drainage improvement projects throughout the County. Our scope of services included overseeing, coordinating and inspecting the work of design consultants, surveyors and construction contractors. Responsibilities also included monitoring, record keeping, approving and recommending requisitions for payments, review of change orders, estimations, claims, scheduling, shop drawings and remedial designs, Responding to request for information (RFI), and assuring compliance with construction documents. (SRS was Prime Consultant) r I ,. J l I , I LJ l J , J I J . I . I 1 1 ~l PROJECT NAME: Ponce de Leon Blvd. CEI CLIENT'S NAME: City of Coral Gables Department of Public Works rl rl TYPE OF FACILITY OR SERVICES: Construction Inspection Services SRS PROJECT FEE: $ 194,663.53 ~l COMPLETION DATE: On-going l KEY INDIVIDUALS INVOLVED: Ignacio Serralta, P.E. Oliverio Sanchez. P. E. Ralph Pereda Luis Hurtado ~ 1 PROJECT DESCRIPTION: ~ ) Construction administration support and inspection services during the construction of Ponce de Leon Boulevard Median Beautification project as required by the Department in order to meet FOOT's LAP Program requirements. Scope of Work included, but not limited to, the following: , 1 ~ I · Provide CEI and construction administration services as required for the LAP Program. · Attend pre-construction meeting and prepare minutes for distribution, · Review shop drawings submitted by Contractor for adherence to construction documents, · Attend bi-weekly progress meetings and prepare for minutes for distribution. · Respond to Contractor request for information and clarification of contract documents. . Coordinate utility issues/conflicts. · Process all construction correspondence and documents. · Review and recommend Contractor payment requisitions. . Review Contractor's certified payrolls, · Conduct labor interviews to assure wage rate compliance. Verify Contractor's Disadvantaged Business Enterprise (DBE) on- going training program. . Review Contractor EEO requirements. · Provide On the Job Training (OJT) monitoring and reporting. · Review and recommend Contractor change order requests, if any. . Provide full-time inspector (40 hours per week), · Conduct semi-final inspection and prepare punch list. · Conduct final inspection, punch list, and contract close-out. · QAJQC - limited materials and density testing Provide independent assurance testing and coordinate with testing lab to obtain sampling and testing, Compare test results and document in project records. · Provide photo history of project in digital format. · Other construction phase engineering services as requested by the Department. . Construction cost $1,816,772.42 ~ I I 1 l J r'l l J 1 ~ J l j l j '. , , J 1 rl 1 rl ~1 ~l ~ I ~ 1 ~ ) I I :] I ~] I : I MIAMI- DADE , . .,. , Miami-Dade County Office of Capital Improvements Statement of Technical. Certification Categories Firm: SRS Engineering, Inc. 5001 SW 74th Court,' Suite 201 Miami Lakes, FL 33155' CATEGORY APPROVAL EXPIRATION ~ CATEGORY DESCRIPTION DATE DATE 3.01 HIGHWAY SYSTEMS - SITE DEVELOPMENT AND PARKING LOT DESIGN 8/18/201 0 8/31/2012 3.02 HIGHWAY SYSTEMS - HIGHWAY DESIGN 8/18/2010 8/31/2012 3.06 HIGHWAY SYSTEMS - TRAFFIC CALMING 8/18/201 0 8/31/2012 3.09 HIGHWAY SYSTEMS - SIGNING, PAVEMENT MARKING, AND 8/18/2010 8/31/2012 CHANNELIZATION 4.01 AVIATION SYSTEMS - ENGINEERING DESIGN 8/18/2010 8/31/2012 6.01" PORT AND WATERWAY SYSTEMS - ENGINEERING DESIGN 8/18/201 0 8/31/2012 5.03 PORT AND WATERWAY SYSTEMS - CRUISE TERMINAL DESIGN 8/18/2010 8/31/2012 5.05 PORT AND WATERWAY SYSTEMS - CARGO TERMINAL DESIGN 8/18/2010 8/31/2012 5.08 PORT AND WATERWAY SYSTEMS - MARINE ENGINEERING DESIGN 8/18/2010 8/31/2012 6.01 WATER AND SANITARY SewER SYSTEMS - WATER DISTRIBUTION AND 8/18/2010 8/31/2012 SANITARY SEWAGE COLLECTION AND TRANSMISSION SYSTEMS 6.02 WATER AND SANITARY SewER SYSTEMS. MAJOR WATER AND 8/18/2010 8/31/2012 SANITARY SEWAGE PUMPING FACILITIES 10.01 ENVIRONMENTAL ENGINEERING - STORMWATER DRAINAGE DESIGN 8/18/201 0 8/31/2012 ENGINEERING SERVICES 11.00 GENERAL STRUCTURAL ENGINEERING 8/1812010 8/31/2012 16.00 GENERAL CIVIL ENGINEERING 8/18/201 0 8/31/2012 17.00 ENGINEERING CONSTRUCTION MANAGEMENT 8/18/201 0 8/31/2012 f 1 l J I ( I , J b- J I I J ~H~ Luisa M. Milian, R. A., Chairperson ' Chief, Professional Services DMslon Office of Capltallmprovernents l I LJ , . J r 1 l ,tZ\b~ :i~ln~n4 ~nnrb nf. .. . ~1.inginttrs ,5 ~ Inc. b authorized under the provislo;:s of S. ~ ~ . a Stlltutes, to :ffer engineering services' to the pub lie tlu'ough 1\ PJ'ofesslonal Erigini!t ~,~ ed under Challter 471, Florida Statutes. Certificate of Authorization rl ~l EXPIRATION: 2/28/2013 AUDIT No: 228201303185 CA. Llc. No: 7317 ~ 1 : 1 Gr;,\~'b~ ~>!~?!flu:t'f~~ 0' '~~~,.. ~ : ~nttrb n,fd' ''"~, :d\2.lingittttts , \.r . '< Igna~i., ..."a, P.E. \< . ">' " ":<~?;".!,,.~.:.J~.~jV'/ . . ." IS LICENSED AS A PROFESSIONAL ENGINEER UNDER CHAPTER '471 , FLORIDA STATUTES EXPIRATION: 2/28/2013 P.E. Llc. No: AUDIT No: 228201326980 45609 ~ J : 1 j : 1 I l A I I r ) I ,J f 1 ?\~t~ ~.>~,~..~. 1:cr:t'f..\, /c'l: ."lii'. . -<r q CJrilnnrb nt~ " (~:P1t~ ~rtrtin~tts ,~ ;, ; '!~';l,\r-'\~ ~ ,. i'\'(~. .' ~11f~1 Oliveri " ez, P .E. '\: -,t'<;l /,_:"".f. .."..~l:".'. . . ..\,.r" "',!ifpLl \\'1\" :l;';'" ~,.......,,,,~.,;1- I J ~ I , I Is LICENSED AS A PROFESSIONAL ENGINEER UNDER CHAPTER 471, FLORIDA STATUTES EXPIRATION: 2128/2013 P,E, L1c. No: AUDIT No: 228201322602 44771 , J , I ?}~\~ :::!,:{!lu:t'f~~ ('ll '.' . ,.~o\,., ~ . .S1nurll~1!l illll t ~~9i\).... ....... ",flLk ',)i'Gis ..,.E"" :," . 'i:")'~\f.(, . J!t' '. ;,.~/.:.1" ' ~:/"~~!~J,l~~ ~r ' Is L1Ce;NSED AS A PROFESSIONAl.ENGINEERUNDER CHAP.TER471.FLORIDA STATLJTES EXPIRATf91'-l: 21281~~p .' , .' '. . '. ,', B.E. L1C; No: AUDIT NO: 228201315291 '. 66366 , I , I ,. I I J , J I I I I ID Task Name Finish Februa March A , M, June 116 1/13 1120 1/27 213 2/10 '2117 ~24 '" 31103/17 3124 "" 4" 41144/21 4128 5/5 51125119 5126 ~, PROJECT DURATION M=_1/2] , DES/GN PHASE _..~--~.- 144 days Thu 2/2/12 Tue 8/21/1 Kick-off Meeting and Initial Project Review 1 wk Thu 2/2/12 Wed 2/8/j Topographical Survey 3wks Thu 2/9/12 Wed~29/1 Utility Search 4wks Thu2/9/12 :e~_3/7/1 Geotechnical testing 2wks Thu 2/9/12 Wed 2~22/j --- - 30% Complete Submittal 4 wks Thu 3/1/12 Wed 3/28/1 City Reviews 10 days Thu 3/29/12 Wed 4/11/1 60% Complete Submittal 4wks Thu 4/12/12 Wed 5/9/1 I. City Reviews 10 days Thu 5/10/12 Wed 5/23/1 I I Specification Complete Submittal 2 wks Thu 5/10/12 Wed 5/23/j 12 City Reviews 14 days Thu 5/24/12 Tue 6/12/ I I I 90% Complete Submittal 2 wks Wed 6/13/12 Tue 6/26; I - -- ~ -~-- -- Wed 6/27/12- ~tue 7110) I 14 City Reviews 10-ifays' I I ! - I 100% Complete Submittal 1 wk Wed 7/11/12 Tue 7/17/ I I 18 City Reviews 5 days Wed 7/18/12 Tue7/24; I I ] Permit Submittal and Processing 4wks Wed 7/25/12 Tue 8/ii; I 18 I BID PHASE 45 days Wed 8/22/12 Tue 10/23( , 19 Advertize Project 2 wks Wed 8/22/12 fue 9/41 J I '" - ---- Wed 9/5/12 TUe 9/181 Response to Bidder's Questions 2 wks I I I 21 Bid Opening 1 wk Wed 9/19/12 Tue 9/251 '1 I I J " Review Bids and Award 4wks Wed 9/26/12 T ue 10/231 I I 23 CONSTRUCTION PHASE 139 days Wed 10/31/12 Mon 5/13/ ... 1 I 24 Pre-Construction Meetin-g 2 days Wed 10/31/12 Thu 1i11J J I 25 Start of Construction 1 day Fri 11/16/12 Fri 11/16/ i 26 Construction Mobilization Mon 11/19/12 I 5 days Fri 11/23/ d 27 Maintenance of Traffic Set-Up 2 days Mon 11/26/12 Tue 11/271 Drainage Construction 45 days Wed 11/28/12 Tue 1/29 d 29 _..~--- ~- -45 -days Wed'1/30/13 -,I Roadway Construction Tue 4/2, I I Signing and Pavement Marking Construction 5' days' Wed 4/3/13 - Tue 419: ,-- ' I .I 31 Sidewalk Construction '10 days Wed 4/10/13 Tue 4/23: I 32 Preparation of As-Built - 4 days ----. ._-- - Mon 4129. ~L Wed 4/24/13 J d 33 Final Completion Date of All Work 5 days Tue 5/7/13 Mon 5/13 34 35 ~--~------- 2wks Tue 5/14/13 . Mon 512~ Post-Project Activities Task Split Progress - a ~~ 1 1 ~l ~l ] ~ 1 I ~] I : 1 i : 1 ~ I Our Team will be led by Mr. Ignacio Serralta, P.E., who will serve as Principal-In-Charge. Mr. Serralta is the President of the firm and sole owner. He has over twenty-five years of experience in civil engineering planning, design, and management for a wide range of public works, site development, and infrastructure projects. Mr. Serralta will be personally overseeing the management of the assigned projects and coordinating between the City and the SRS Team. Mr. Serra Ita will be your key point of contact. Our Senior Project Manager will be Mr. Oliverio Sanchez, P .E. Mr. Sanchez has over thirty- three years of experience in project management and engineering design for both public and private sectors in Central and South Florida, Mexico, the Caribbean and Spain, in fields such as land development and site planning, airport work on both landside and airside, port and marina developments, municipal engineering, storm water management and drainage engineering, roadway engineering, construction management, field supervision, and quality control. His extensive municipal project experience has provided him with broad knowledge in project coordination, dealing with governmental agencies and plan approvals and processing. Mr. Sanchez was the project manager on several City of Sunny Isles Beach projects including Bella Vista Park, Collins Avenue Beautification, and Arlen House Streetscape. Our Design Project Manager will be Mr. Jean-Claude Fontaneau, who has fourteen years of experience in civil engineering design. He has been responsible for the planning and design of a variety of municipal and site development projects. Mr. Fontaneau is primarily responsible for the engineering design and preparation of plans and specifications including the design of pump stations, water and sanitary sewer pipelines, site development projects, roadway improvements, and storm drainage systems. Mr. Fontaneau was the project manager in charge of the design of several municipal projects including NW 13Sth Street Roadway and Drainage Improvemetns, NW 9ih Avenue Roadway Improvemtns, Miller Road Widening and several municipal site improvement projects including parks, marinas and community centers. , 1 Our Structural Engineer will be Gisela Rey, P.E. Ms. Rey has over 25 years of experience in design, planning and management of structural engineering projects for port facilities, including docks, fender systems, harbor crane supports, wharf extensions, mega cruise ship terminals and canal stabilization. Among her recent experience is the seawall replacement at Archeological Tequesta Circle in Miami River. Responsibilities included design and construction document preparation. I ' I I J I I I d Our principals and project managers are further supported by a staff is a highly motivated, experienced group of professionals including engineers, designers, construction managers, field inspectors and support staff. , J Please enclose Organizational Charts and Key Personnel Resumes for additional information. I l J I, J I 1 J J 1 1 ~l ~ ~1 l ~l ~l , I Ie J ~ : 1 I i :] : ] : I ~ ] ~ J I l j I ... J I lJ I I ,J