Loading...
HomeMy WebLinkAboutSavino & Miller Design Studio J ) ~) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) REQUEST FOR QUALIFICATIONS: DESIGN AND PERMITTING SERVICES OF THE INTRACOASTAL PARKS RFQ# 12-04-04 R: ~.'~' ("" E. ~ \JII ro!"'"' D . f.'"'".' P If~. i.i:i.u....,!) '" it:: MAY - 1 ?n12 M~ lD.01 . City 01 Sunny IslGS Beach Omen of the City Clerk SUBMITTED TO: CITY OF SUNNY ISLES BEACH BY: SAVINO MILLER DESIGN STUDIO MAY 1,2012 ) ) J ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) , ) ) ) savi nom iLler DES G N S T U 0 o LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE May 1,2012 Jane A. Hines, CMC, City Clerk City of Sunny Isles Beach 18007 Collins Avenue Sunny Isles Beach, FL 33160 RE: DESIGN AND PERMITTING SERVICES OF THE INTRACOASTAL PARKS Request for Qualifications No. 12-04-04 Dear Ms. Hines: On behalf of Savino & Miller Design Studio, I am pleased to submit the response to your Request for Qualifications to provide Professional Design & Permitting Services of the Intracoastal Parks Request for Qualifications No. 12-04-04. After carefully reviewing your Request for Proposal's Scope of Services / Specifications and visiting the Sites, we have assembled an expert team of professional consultants in order to design and implement the City's vision for these park sites (which is essentially one waterway park separated by the Poinciana Island Entry Drive), as well as the streetscape by the Arlen House, if required. . Savino & Miller Design Studio is a minority-owned design firm that specializes in a multidisciplinary approach to landscape architecture. My fellow partner, Adriana Savino, and I have extensive experience in master planning, streetscape design, open space design, and landscape architecture for many institutional, public facilities, commercial and residential projects, including your own Sunny Isles Beach City Hall Complex Plan. We have designed from conception to implementation many urban parks and plazas. Our park experience includes: · South Pointe Park (20 acres), which was awarded the 2010 FNGA Award of Excellence in Landscape Architecture: · Belle Isle Park, (4 acres), along the Venetian Causeway in Miami Beach · Homestead Bayfront Park Master Plan, awarded the 2007 APA Gold Section Award of Excellence. · Greynolds Park Master Plan, · Matheson Plantation Village in Crandon Park (1.5 acres), · Museum Park (22 acres), (formerly Bicentennial Park). This is one of the most exciting Park projects in the region, adjacent to Biscayne Bay and the new Miami Art Museum and Museum of Science. Additionally, we are proud to say that we are part of the team that recently prepared the approved Master Plan for the Garage/Park project on Sunny Isles Beach Boulevard and 163rd Street, at one of the City's major entries. This park project is part of the new wave of conversions from underutilized commercial centers to green space, and the City seems to be moving forward in this direction with the upcoming park project advertised in the RFQ. Our streetscape experience is also extensive: · Brickell Avenue Median from 5th to 15th St. in downtown Miami; · Arthur Godfrey Roadway (41st Street) and Bridges in Miami Beach; 12345 NE 6TH AVENUE A NORTH MIAMI, FLORIDA 33161 T: 305.895.9082 F: 305.895.9083 WWW.SAVINOMILLER.COM L:: . --=-1:_1 .- -- ) ) ) ) ) ) ) ) I ~ } ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) . Washington Avenue (5th to 16th St) in Miami Beach; . 12ih Streetscape Improvements, in North Miami. . 125th Street Central Business District Streetscape Master Plan, which included sidewalk paving improvements in Phase 1; are a few examples of our creative work in FDOT right-of-ways. This project experience would be applicable to both the Parks and Arlen House streetscape projects. Savino & Miller Design Studio is teaming up with Langan Engineering, which has proven permitting experience as well as an excellent track record in regards to their Civil, Environmental, Geotechnical, Surveying and Traffic engineering professional services, especially in open space public sector work. Lisa Hammer who will provide practical knowledge and experience in horticulture and as an arborist and in creating maintenance guidelines for the projects. Finally Ken DiDonato, PE will provide Irrigation Design. He has more than 20 years of experience and we work closely in many of our projects. We are excited by the conversion of these commercial or underutilized lots into viable public Parks. We will be honored with the opportunity to be part of this great effort with the City of Sunny Isles Beach by designing , permitting and implementing these as beautiful Parks, ones that will make the City of Sunny Isles Beach proud.. We look forward to the opportunity to work with you to design and help build a beautiful waterway park and streetscape for Sunny Isles Beach. Thank you. Respectfully submitted, ~Ne-&-MlttE~ DESIGN-ST~. (L(C C000208) ,/- _.~ \ ~- ~,/~-------------- //i3:rryMiller // Vice-President (FL #866) \ , I:_I~-~ ---- ) ) ) ) ) ) ) ) - ) ) ) ) ) ) ) ) ) ) ) ) } ) \ , \ I I I TABLE OF CONTENTS 1. Company Information .... .......... ............. ....... ....... ..... ............. ........................... 2 2 . Qualifications ... .. " . .. .. .. ... . . .. .. . .. .... . ...... . . .. . .. . . ..... .. .... . . . .... . . . . . .... . .. ..... . . .. . . . . . . . . . . .. . 13 3. Staffing ... .............. ................................ .......................................................... 33 4. Approach / Methodology ................................................................................ 74 5. References ...................................................................................................... 80 6. Office Locations............................................................................................... 85 7. Contract Forms................................................................................................ 87 _,,,a'lil!!lli. 1 ~ ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) · Name of Agency: Savino & Miller Design Studio, P.A. (Savino Miller) · Company Location: North Miami, Florida . Website: www.savinomiller.com . Business Structure: Savino & Miller Design Studio is a Florida Corporation · Date Founded: April 16, 1993 · Home Office Address: 12345 NE 6th Avenue. Suite A North Miami, Florida 33161 (305)895-9082 office - (305)895-9083 facsimile . Outstanding Litigation: The design team, including Savino & Miller Design Studio as a sub-consultant; the general contractor and the City of Miami Beach are currently involved in litigation in regards to South Pointe Park. This litigation will in no way will threaten the viability of the firm or the performance of this contract. . Insurance: Savino & Miller is fully insured. Certificates enclosed. . Implement Service: Savino Miller Design Studio will implement service immediately after being authorized to begin. Savino & Miller Design Studio, P.A. has been practicing Landscape Architecture continuously for 19 years, since 1993, when Principals Barry Miller and Adriana Savino founded the firm. There has been no disciplinary action taken against the firm todate. Please see attachments for firm licenses and insurances. ~ifJnlmilII;}""l[.IIRoOlm;/riI!I:~;('.fj"l!"'!il!'!i. 31 ) ) ) ) ) ) ) ) , ) ) ) ) ) ) ) ) ) ) ) ) ) State of Florida Department of State I certify from the records of this office that SAVINO & MILLER DESIGN STUDIO, P.A. is a corporation organized under the laws of the State of Florida, filed on April 16, 1993. The document number of this corporation is P93000028651. I further certify that said corporation has paid all fees due this office through December 31, 2012, that its most recent annual report was filed on January II, 2012, and its status is active. I further certify that said corporation has not filed Articles of Dissolution. \ J Given under my hand and the Great Seal of Florida, at Tallahassee, the Capital, this the Twelfth day of January, 2012 ~'."6 Secretary of State Authentication 10: 600217971586-011212-P93000028651 To authenticate this eertificate, visit the following site, enter this 10, and then follow the instmetions displayed. https:/lefile.sunbiz.orglcertauthver.html 41 ") ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) \ , 51 ATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF 'LANDSCAPE ARCHITECTURE 1940 NORTH MONROE STREET TALLAHASSEE FL 32399-0783 (850) 487 -1395 .,. . SAVINO..r. MILLER DESIGN STUDIO, P.A. 12345 HE 6TH AVE SUITE. A N. M!~I FL 33161 ~- . n... --.'~"'~ ......~.......... ~.~ ~ .:.~:. ~.~~:~..t~." ":,~'''''_ ',_: '.'.'. ......~.,~,.. H". ...."..".. .;.. .................... ... p~-,,'~-~:~:t: .~~ congratuiatioOsl{With this license you becOme one of the near!y ol'le million ., FlOridians licensed by the Department of Business and ProfeSSIonal Regulation. . Our professionals' and busiriessesrangefrcirnarchitects to yacht brokers; from ~?Ce~ to ba~9"tie, r~tatirarits, and they keep Florida's economy strong. Every day'N~ Y{lJt'~ to irnprove.theway \va. do.btisi"ess In orderto serv13. you be~er. For Information about our servICeS; please log 'onto www.myftorldalicense.com. There you 'can find more Information aboUt our divisions "andthe regulations that impact you,' subsaibe. to department newsletters and learn more about the ,. Qepartmenfs initiativ~s. . Our mi~slonatthe Department is: Ucense"i:fflciently. Regulate Fairly. We conStanUy.Strive to serve yOu bEitter so qiat yOu can serve your cuStomers. Thank you for doing business In Florida; and congratulations on your new Iicensel _.,.aI!!!!I!!. 51 ) ) -, ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) Form W-9 Request for Taxpayer Identification Number and Certification Give form to the requester. Do not send to the IRS. (Rev. October 2007) Department of the Treasury Internal Revenue SelViee Name (as shown on your income tax return) SAVINO & MILLER DESIGN STUDIO, INC. N Q) C>> <U D- c o Qj Ul c.g ~"" .... u 02 1:t) ._ c Q:~ '0 Qj c. l/) Q) Q) l/) Business name, if different from above Check appropriate box: D Individual/Sole proprietor GZJ Corporation D Partnership D Limited liability company. Enter the tax classification (D=disregarded entity, C=corporation, P=partnership) ~ _ _ _ _ _ __ D Other (see Instructions) ~ Address (number, street, and apt. or suite no.) 12345 NE 6th Avenue City, state, and ZIP code North Miami, FL 33161 List account number(s) here (optional) Taxpayer Identification Number (TIN) D Exempt payee Requester's name and address (optional) I Social secu~ity num~er , , Enter your TIN in the appropriate box. The TIN provided must match the name given on Line 1 to avoid backup withholding. For individuals, this is your soeial seeurity number (SSN). However, for a resident alien, sole proprietor, or disregarded entity, see the Part I instructions on page 3. For other entities, it is your employer identification number (EIN). II you do not have a number, see How to get a TIN on page 3. Note. If the account is In more than one name, see the chart on page 4 for guidelines on whose number to enter. or Employer identification number 65 : 0412661 Certification Under penalties of perjury, I certify that: 1. The number shown on this lorm is my eorrect taxpayer identilieation number (or I am waiting for a number to be issued to me), and 2. I am not subject to backup withholding beeause: (a) I am exempt from backup withholding, or (b) I have not been notilied by the Internal Revenue Service (IRS) that I am subject to backup withholding as a result 01 a failure to report all Interest or dividends, or (e) the IRS has notified me that I am no longer subject to backup withholding, and 3. I am a U.S. citizen or other U.S. person (defined below). Certification instructions. You must eross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding because you have failed to report all interest and dividends on your tax return. For real estate transaetions, item 2 does not apply. For mortgage interest paid, acquisition or abandonment of secured property, cancellation of debt, contributions to an individual retirement arrangement (IRA), and generally, payments other than interest and dividends, you are not required to sign the Certification, but you must provide your correct TIN. See the instructions on page 4. Sign I Signature of Here . u.s. person ~ Date ~ General Instructions Section references are to the Internal Revenue Code unless otherwise noted. Purpose of Form A person who is required to file an information return with the IRS must obtain your correct taxpayer identification number (TIN) to report, for example, income paid to you, real estate transactions, mortgage interest you paid, acquisition or abandonment of secured property, cancellation of debt, or contributions you made to an IRA. Use Form W-9 only if you are a U.S. person (including a resident alien), to provide your correct TIN to the person requesting it (the requester) and, when applicable, to: 1. Certify that the TIN you are giving is correct (or you are waiting for a number to be issued), 2. Certify that you are not subject to backup withholding, or 3. Claim exemption from backup withholding if you are a U.S. exempt payee. If applicable, you are also certifying that as a U.S. person, your allocable share of any partnership income from a U.S. trade or business is not subject to the withholding tax on foreign partners' share of effectively connected income. Note. If a requester gives you a form other than Form W-9 to request your TIN, you must use the requester's form if it is substantially similar to this Form W-9. Definition of a U.S. person. For federal tax purposes, you are considered a U.S. person if you are: . An individual who is a U.S. citizen or U.S. resident alien, . A partnership, corporation, company, or association created or organized in the United States or under the laws of the United States, . An estate (other than a foreign estate), or . A domestic trust (as defined in Regulations section 301.7701-7). Special rules for partnerships. Partnerships that conduct a trade or business in the United States are generally required to pay a withholding tax on any foreign partners' share of income from such business. Further, in certain cases where a Form W-9 has not been received, a partnership is required to presume that a partner is a foreign person, and pay the withholding tax. Therefore, if you are a U.S. person that is a partner in a partnership conducting a trade or business in the United States, provide Form W-9 to the partnership to establish your U.S. status and avoid withholding on your share of partnership income. The person who gives Form W-9 to the partnership for purposes of establishing its U.S. status and avoiding withholding on its allocable share of net income from the partnership conducting a trade or business in the United States is in the following cases: . The U.S. owner of a disregarded entity and not the entity, Cat. No. 10231X Form W-9 (Rev. 10-20D7) ~;.~n1r:'1'1I1I:I:l['IINl'mI[.:a:~;[..ii'.a'.llI!:':ra 61 ) ) ) ) ) } ) ) ) ) ) ) ) ) ) ) ) ) ) , ~ ~ . .-4 ~ o .......c ~ 4-1 o ~ tJ ~ (/) ~ ~ 5 ~.g ~ :g ~ ~ ~ d ~.~ ~ · N ~I ,s C ~ ;g !'""1 . Q ~ .~ ~ ~ b V3 s- a> ~ o .- "'C :J ...... CI) C 0> '00 a> o - .- ~ ~ o c '> co CI) :'CSity eo .~ -Q b .~ a g. t,/) '1J ~-:> '~.Jo - . .1., " . ,. , . S o }...j '-+-I '"d o '-+-I . ~ o }...j 00 Q) ~ ~ o ctS '@ }...j ,~ 0 >'-+-1 o 00 }...j Q) ~~ Q).8 ~ ctS ~ ~ }...jCf) Q) ctS '"d'"d ~ .~ ~ ~ '"d~ Q)~ ~ ~t..... ,~ 00 t:rl Q) . uL!) 000'\ ~N '"d ~ ctS t..... 00 N V) <lJ u 'S "- <lJ V) ...... t::c <lJ '_ E ~ <lJ QJ OI.~ cc . t:: "- o QJ ~:::::: Q.. '&~ ......V) ~'& . ('i) s ~ 0 It) "-s::... '" T'"" 0 2.~ I 0 '" '" C\I <lJ ct'l C C'l --- ct'l ('i) 0 ....J T'"" "'C ~ --- '\:: Q) r---.. 0 <LI <Il 0 i:i: <Il cO ..c ~ 0 (ij E-< ~ . T'"" T'"" o C\I --- ('i) T'"" --- r---.. o C ~~ ~ ~ ~ III ~~ o ~ >. ..... '00 ... <LI :> is ... ,~ P.. 0.. ;:l (/) ...... o <LI .~ ...... (5 d ) ) 1 ) ) ) ) ) ) ) ) ) ) ) ) ) ) , ) I=-:) savi ncm iller DES GN STUD 0 LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE SAVINO MILLER DESIGN STUDIO (SMDS) provides professional consulting services in the fields of Landscape Architecture, Architecture, Urban Design, and Planning. The studio's strength lies in its multi-disciplinary experience and collaborative approach to open space design. Our work includes projects in urban design, streetscape design, site and community planning, residential, commercial, hotel/resort, and park design. SMDS began in 1988 and incorporated in 1993 under the partnership of Adriana Savino & Barry Miller. Our initial work focused on gardens, open space improvements, color schemes for Deco buildings and gate designs throughout Miami Beach's Art Deco District. Since 1993, Savino & Miller Design Studio has expanded its scope of work to include public sector projects such as Streetscape Master plans, Urban Design Guidelines, Master Plans, City Hall/Community Centers, Schools, Libraries, Parks, and private sector work including Hotels, Condominiums, Resorts and small scale Architecture/Interior Space Planning. Today, the firm is well established in South Florida where it continues to work on a diverse range of projects, varied in scale and theme. The firm's collaboration with multidisciplinary teams is exemplified in the successful completion of South Point Park and Belle Isle Park; 41st Street Bridge and Streetscape Master Planning, Espanola Way, Washington Avenue Streetscape, and Alton Road Golf Course Streetscape; Royal Palm Crowne Plaza Hotel, Costa D'Este; Aventura City Hall, Sunny Isles Beach City Hall, North Miami Beach Police Facility; Johnson & Wales University, HHH Cypress Bay School, Christopher Columbus High School, and Miami-Dade County High School Prototypes; Marquard Residence, Korge Residence, Sanchez Residence, Subotnick Residence; and affordable housing projects. Our award-winning projects are a reflection of our firm's dedication to provide design services for a diverse clients scale and type. These include the 1999 FLASLAAward of Merit for the Marquard Residence, the 2007 APA Gold Coast Chapter Award of Excellence for the Homestead Bayfront Park Master Plan, the 2010 FNGAAward of Excellence for South Pointe Park, and the 2007 FLASLA Award of Excellence and the 2007 Frederic B. Stresau Award for the Korge Residence. Current projects include Museum Park, the SLS/Ritz Plaza Hotel, Surfside Community Center, Matheson Plantation Village (Crandon Park), Aventura Professional Tower, Biscayne Pointe Neighborhood Streetscape Master Plan, Venetian Islands Streetscape Master Plan and various condominium/residential projects. STAFF: ABOUT SAVINO MILLER DESIGN STUDIO Adriana Savino-Miller, AlA, President Architecture, BA 1979 Universidad Central de Venezuela Master in Architecture/Urban Design,1982 University of Pennsylvania adriana@savinomiller.com Courtney Hochman, Associate Anthropology and Art, BA 2001 Metropolitan State College of Denver Landscape Architecture, MLA, 2008 Florida International University courtney@savinomiller.com Nathan VanDeman, Associate Landscape Architecture, BS, 2009 Purdue University nathan@savinomiller.com Barry Miller, ASLA, Vice-President Landscape Architecture, BLA, 1979 Urban/Reg. Planning, MAURP, 1985 University of Florida barry@savinomiller.com Anwar Morales, Associate Horticulture, BA, 2001 University of Puerto Rico Landscape Architecture, MLA, 2009 Florida International University anwar@savinomiller.com 81 ) ) ) ) ) ) ) ) 1 ) ) ) ) ) ) ) ) ) ) ) \ .-:=-. savinomiller DES GN STUD 0 LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE BARRY R. MILLER Landscape Architect Barry R. Miller was born in Miami, Florida and attended the University of Florida, where he received his Bachelor's Degree in Landscape Architecture in 1979, and Master of Urban & Regional Planning in 1984. In 1982, he became a licensed Landscape Architect in the State of Florida and served as Miami Section Chairman of the American Society of Landscape Architects. His graduate thesis work focused on regional development in Jamaica, and has since worked on a various private and public setor projects. These include the Aventura City Hall, Sunny Isles Beach City Hall, Loews Convention Center Hotel, 41st Street Beautification Project, Coconut Grove Planning Study, Washington Avenue Master Plan & Streetscape Improvements, and the North Miami Beach City Hall/Police Station. He has also worked extensively in the historic preservation of many buildings in the Miami Beach Art Deco District. In addition to these projects, he was also involved in the Bond Projects for the beautification of four Miami Beach Neighborhoods: La Gorce, North Shore, Nautilus, and Venetian Islands. ABOUT PRINCIPALS ADRIANA SAVINO Architect Adriana Savino was born in Caracas, Venezuela where she received her Bachelor's Degree in Architecture in 1979. In 1980, she obtained an academic scholarship to study at the University of Pennsylvania Graduate School of Fine Arts, where she received a Master's Degree in Architetcure, with a specialty in Urban Design. Since moving to Miami in 1983, Adriana has worked on a diverse portfolio of urban design, master plan and streetscape projects, including Coral Gables Master Plan, the Hollywood Streetscape Improvements / Design Guidelines and the Puerto Careyes Resort Deevelopment in Mexico. She was project designer for the University of Miami Campus Plan International Competition Grand Prize Winner, while at WRT. Since forming Savino & Miller Design Studio in 1993, her projects include the North Miami Beach City Hall Complex & Police Facility Master Plan, Kuta Beach Hotel and Club Master Plan in Bali, Indonesia, the Royal Palm Hotel in Miami Beach, the Washington Avenue Streets cape Master Plan, the 41 st Street Beautification and the Loews Convention Center Hotel Master Plan. In addition to these projects, she was also involved in the Bond Projects for the beautification of four Miami Beach Neighborhoods: La Gorce, North Shore, Nautilus and Venetian Islands. 1t-"i;\.JIII....~nlr:rll~lmltil!!l:.l;[..:'.i~.a.!Jl!.!J!I 91 ) ) ) ) ) ) ) ) - ) ) ) ) ) ) ) ..::: savinamiller DES GN STUD 0 LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE ADD Ine. , Carlos Prio- Touzet Affordable Landmarks, Ine. , Bob Saland ARQ (Arquiteetoniea) , Bernardo Fort-Brescia Behar-Font Architecture Belle Plaza Condominium' Jeffrey Koffman Brickell Area Association' Lynn B. Lewis Bergwin, Charles & Lisa' Residence Mark Campbell Architeets Camber, Diane' Residence Cisneros Fontanals, Ella (CFE) Citibank Real Property Services' Michael David City of Miami Beach' George Chartrand City of Coral Gables' Alberto Delgado City of North Miami' Ana Rijo-Conde City of North Miami Beach' Mike Roberto Consul-Tech Engineering, Inc. 'Marco Osorio Corradino Group I Joe Corradino Duany Plater-Zyberk (DPZ) , Elizabeth Plater-Zyberk DMJM' A.C. Atherton Edwards & Kelsey Engineering' Luis Olivares Feld, Seymour & July' Residence Foram Group' Loretta Cockrum Frankel Benayoun Architects Garza' Residence Gregg Neville, Architect Gross, Jane' Residence I Gross, Commissioner Saul & Jane' Residence I Jaime Schapiro & Associates, Architect Jackson Memorial Hospital l Jameek Development Corporation' Mel Schlesser \ Johnson & Wales University' Donald McGregor Jorge Hernandez. Architect Kobi Karp Architecture and Interior Design' Kobi Karp \ Korge, Christopher' Residence Loews Convention Center Hotel' Eric Nesse Maor Consulting' Moises Gronin 'Marquard, Jurg , Residence Miami-Dade County Park and Recreation' Mark Heinicke Miami Dade Community College Miami Heart Institute' Malcolm Bird Miller, Joseph & Allison' Residence Ocean Reef Club, Key Largo' Evelyn Moss Oppenheim Architecture + Design' Chad Oppenheim I Orr's Pond Community' Linda Tobin Peebles Atlantic Development Corporation' Don Peebles Perkins & Will Architects' Jose Gelabert-Navia Pierson, Michael and Studzinski, Kevin' Residence Pinnacle Housing Group' Adri Gonzalvo Porto fino Realty Group' Kathy Colonnese Pacific International Equitites , Howard Shapiro Rene Gonzalez, Architect Revuelta Vega Leon, P.A. Roger Piper, Architeet Ruimy , Residence Salomon, Johnny' Plastic Sergeon Schloss, Alice' Residence Spillis Candela DMJM , Julio Grabiel Sorren, William & Ana Maria' Residence Starwood Hotels SOM , Ed Thompson STAArchiteets' Todd Tragash Streamline Development Corporation' Saul Gross Temple Beth David' Herschel Rosenthal Tepuy International' Marcos Santana Thorn Grafton, Architect William Lane, Architect Wyatt, John & Rebecca' Residence Zyscovieh, Inc. , Bemard Zyscovich PROJECT CLIENTS ~"'I:;\T~III..;.~n I r:TiI~.I:}''':I['IINm;ItiI!I:~ ;:..Ii Jf.a'!!I!'!!~ u 101 ) ) ~) ) ) ) ) ) ) ) ) ) ) ) , ) } ) ) ) ) ) } ~ AC~R.~"" CERTIFICATE OF LIABILITY INSURANCE I DATE (MMIOO/YYYY) ~. 04111/2012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR AlTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER. AND THE CERTIACATE HOLDER. IMPORTANT: Iflhe certificate holder is an AODITIONAlINSURED. the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and cond~ions of the policy, certain policies may require an endorsement A statement on Ihis certiflCale does not confer righls 10 the certifICate holder in lieu or such endorsemenl(s). PRODUCER COllfACT NAME RICH PIVARCYK LeatzDw hisurance PHONE (312) 930--5556 FAX (866) 741.2n8 300 S. Riverside Plaza, Suite 2100 EMAlL ADDRESS rich@leatzowinsurance.com Chicago, IL 60606 INSURER(S) AFFORDING COVERAGE NAIC# INSURER A: New Hampshire Insurance Company 23841 INSURED INSURER B: Savino & Miller"Design Studio, P.A. IIISURER c: 12345 N.E. 6th Ave. Suite A IIISURER 0: North Miami Beach, FL 33161 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVIStON NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE lISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING AN'( REQUIREMENT. TERM OR CONDITION OF AllY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS ,,- C.EB.1Jfl<<hTE.MAY.aEJSSVEQ..QB.MA"(~T!lIN, THE; INSlJRAt-ICE AFFOBOJ:DBY.JllE POlICIES DESCRIBED HEREIN IS StJ8JECT TO AlL THILTERMS. EXCLUSIONS AND CONDITIONS OF SUCH POlICIES.lJMTS SHOWt4 MAY HAVE BEEN REDUCED BY PAlO CLAIMS. INSR TYPE OF INSURANCE AOOI SUBr POlICY IIUMBER POLICY EFF POliCY EXP LIMITS LTR IHSR WVO IMM/llllIYYYYI 'MMIOOIYYYYI GENERAL UABIUTY EACH OCCURRBK:E S ~ COMMERCIAL GENERAL LIABILITY D D DAMAGE TO RENTED $ I-- o ClAlMSM.lDE DoccUR lPREMISES (Ea occwrer.ce) I---- MEa EXP (Anyone pe"",,) S DOES NOT APPLY PERSONAL AND ADV ItIJURY $ IGENERAL AGGREGATE $ nAGGREn~IMrr APPlIrr' PRODUCTS. COMPIOP AGG S POLICY PROJECT LOC AUrOM08ILE lIABILITY COMBINED SIt/GLE LIMIT $ DANY AUTO o Scheduled D D (Ea a_I) AUlDS DOES NOT APPLY BOOL Y INJURY (Pet person) S o ALL OWNED o Non-owned BOOL Y INJURY (Pet accident) AUTOS AUlDs o Hired Autos PROPERTY DAMAGE S (Per ao<idenQ UMBRELLA UAB B ,OCCUR II EACH OCCURRBleE - DOES NOT APPLY EXCESS LIAS ClAIMS-MADE AGGREGATE - OED 0 RETENTION S 5 WORKERS COMPENSATION I WCSTATVsl I~TH- AND EMPLOYERS' LlABlllTY YIM TORY IJl.trrs D DOES NOT APPLY E.L. EACH ACClOENT S ANY PROPRIETORJPARTNERlEXECUTlVED WA EL DISEASE. EA EMPLOYEE Is OFFlCERJMEMBER EXeLUDEO? EL DISEASE. POLICY LIMIT $ D D 1,000,000 each claim A PROFESSIONAL LIABILITY 011193351 1/8/2012 118J2013 1,000,000 aggregate DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space Is required) Re: RFQ Landscape Architect only CERTIFICATE HOLDER CANCELlATION City of Sunny Isles Beach SHOULD AN'( OF THE ABOVE DESCRIBED POLICIES BE CANCEUED BEFORE THE City Clerk EXPIRATION DATE THEREOF, NOTICE Will BE DELIVERED IN ACCORDANCE WITH 18070 Collins Avenue THE POLlCY PROVISIONS. Sunny Isles Beach, FL 33160 AUllIORlZED REPRESENTATIVE &~e: LEATZOW INSURANCE - ACORD 25 (2010/05) ~ ~~RD CORPORATION. All rights reserved. The ACCORD name and logo are reglslered marks of ACORD ~fmtri'l!l:l:(..fi"l!'!i!!'!i' 11 ~ ) ) ) ) ) ) ) ) ") ) ) ) ) ) ) ) ) ) ) ) ) ) ......--, ACORD- CERTIFICA TE OF LIABILITY INSURANCE r DAlE IWM DO-,YYVYI ~ 09- 22 -2011 THIS CERTIFICATEIS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPOfol THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVelY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. TI-*S CERTIRCATf:OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(SI. AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CmTIACATE HOLDER. IMPORTANT: If the certlflcat. ho<<Ier Is an AODITIONAlINSURED, the poicyliesJ mUsl be enoorsoo. II SUBROGATlONIS WAIVED, subject to the terms and cortditionsof the policy, certan poIici&9 mey require Bfl enoorsemeflt. A stalemenlon this certificate does not confer rights 10 the certifiCllte holder in lieu of such endorsementlsl. ~ODUC.ER ~XMr\,o' USI INSURANCE SERVICES LLC/PHS PHONt (866}467-8730 . fAA (877) 538-852E 226144 P: (866)467-8730 F: (877}538-8526 (A"C. No E.l(r): ~,''-C, I-io): ,'~_'l!J, PO BOX 29611 AOOR';S s, CHARLOTTE Ne 28229 eUSTQMEHHH: 'NSUR';R'Sl AFFOROING C OVEHAGE ; NAIC' INSUAfO INSL'RER A, Ha L-t fOl-d I ns Co of the Southeast SAVINO & MILLER DESIGN STUDIO INSURERS: Twin City Fire Ins Co 12345 N,E. 6TH AVE, STE A IN5URE.>1 C : tUANI FL 33161 'NSURER 0 : INSURER E : INSURER F : COVERAGES CERTifICATE NUMBER: REVISION NUMBER: I THIS IS TO CERTIFY THAT THE POUCIES OF INSURANCE USTEO BELOW HAVE BEHI ISSUED TO TIlE INSUQEO NAMED ABOVE FOR THt POLICY PERIOD 'tWICATED. NOWlflTHSTANDING ANY REQUIREMENT. TERM OR CONDrrrON OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CtRTlFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AffORDED BY THE POLICIES DESCRIBED HEREllJ 'S SUBJECT TO All THE TERMS. EXCLUSIDrIS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVf BEEN REOUCEO BY PAtD CLAIMS. ',\5,:," TYI'f- OF III$UAANCE ,lfSR WYO POUCY NUMBER 11,r,;;~o~y~';tVJ lrlil:to.'/'{,';'j ~ERAlllAIIl.ITY I '1 i COMMERCIAL GENERAL llAB4l1rY -----:-- CLAIMS.MADE iXl OCCUR I A x-General Liab 21 SBA LF5961 ; GE....l AGGREGATE UM,T APPLIES PER: i I POLICY: P,i{}j-: X IlOC : AUT<!MOIIU UAllltTY i : ~ ~ ANV AUTO i I All OWNED AUTOS . i . : seHEOUlEO AlJTOS ' A- ..x "'REO AUTOS L NON.O",,"W AlJTOS lIMITS <.~CH OCCURRENCE . $ 2, 000 , 000 P.~EM~5tS ',~,"~'~~".) $ 3 0 0 , 0 0 0 i ...EO ~XP !Any ~ p...or,l ,$ 10, 000 ! 08/28'/2011 flS/28/2012 ;>mSONAl ~ AOV:NJURY $ 2,000,000 i G<NERAl ".GG"IEGAH , 4 , 0 00, 000 PflOOUCIS. CO'.'POP AGO!' 4,000,000 : $ co....,e. r.:EO $INGLf liP/.:T IEo! .....:t.de..'U~ '2,000,000 $ . BODILY INJURY I;>~r ,"~~$-:rt) BODILY IN~V::r'l' .:P!t hXid-!'ntl. $ 21 SBA LF5961 i PROPERT'" OA.'\tAGE : 08/28/2011. oe 128/2 012. IPtt l!l(;Ci1f'f'l'l1 $ $ $ $ $ $ $ Ol:t U...IAEUA UAI u OCCU~ ; I I ClAlMS,MAOE! . E'-Cl' oceURR,NCE AGGREGATe I I ! I i 121 EllC<SS UA9 _; OEOUenSLE ! RETENTlON $ WORKERS COIJI_SATIOr< AND EMn.OVERS' UABIUTY Y IN ANY PflOPR'E TO A-'PAA1NER.<XECIITIVEU H I AI B OHiCEA-'MEMBER.El(ClUOEO? rMIH1dB'DI J In Nf-iJ I~ ve:t.. deS(:,ibt l..mele.: . DlSCRlPTION OF O?ERATlO~S below I I , I : _~. {6ij~l,~.~s WEC ZS4648 I : 11/07/2011 1L/07/2012 u. ~"C"'A(;CI):NT $ 1,000 1000 E.l. OISEASE . EA tr~;>"OYE: $ 1, 000 I 000 t.t. DISfASE. POLICY lI/bf' $ 1,000,000 OESCRI'T~H O:F: OPERATIONS J LOCATJOrtS I VEHIClES [Att6Ch ACORD 101. AddtiOOfll FteItWQ SchedJle-.lIlTlOfe- 'pbC8.. rerpUedt Those usual to the Insured's Operations. CEflTlFICATE HOLDER CAN CELLA liON SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCelLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DElIVERED IN ACCORDANCE WITH THE POLlCY PROVISIONS. AU'HORt~ESENT...nvE _ ~ ' Leatzow Insurance ~~n, M ~~hm C~ C~p. ~no Ii:~\'jl.l..;.~n I r.liItI:I."l['I,~!m1t'il!l :~;[..ii Ji'..l!"'l!!!'l!1 12~ ) ) ~) ) ) ) ) ) -) ) ) ) ) ) ) ) J ) ) ) ) \ QUALIFICATIONS, RELEVANT EXPERIENCE AND PAST PERFORMANCE Savino & Miller Design Studio, is a minority-owned design firm that specializes in landscape architecture, with a multidisciplinary approach that includes urban design and architecture. Savino & Miller Design Studio has extensive experience in design and master planning for parks. Our background and experience in landscape architecture, urban design, architecture and planning give us a unique insight into the various elements and forces which shape our built environment. Our method includes an analysis of factors such as climate, physical and sociocultural context, aesthetics, and long term maintenance. We practice to create beautiful and meaningful places, which invite people to interact, enhance their sense of community, and which are beneficial to the local ecology. In so doing, these places can become a source of pride to our neighborhoods and communities. In our Landscape Architecture approach, we are especially interested in reflecting the rich, biodiversity of South Florida native plant life, as well as our unique cultural traditions. At the same time, we believe in being respon- sive to, and instructive of, present and future issues of ecological sustainability, in terms of water use, resource consumption and use of local materials. Having practiced in many public and private projects, we are also keenly adept at creative design in a range of budgets. Our demonstrated Project Experience in the areas requested by this RFQ includes: . Intracoastal Parks Design & Permitting: Our Open Space Parks' scope of work includes a general understanding of a city park system as exemplified in our analysis for the Coconut Grove Planning Study, to site master planning analysis and design shown in our award-winning master plan for the Homestead Bayfront Park; to the specific design and implementation of successful parks. These include Belle Isle Park and South Pointe Park in Miami Beach, the Pinecrest Gardens lighting plan in Pinecrest and the Town Center Plaza in Fisher Island. Presently we are re-designing Museum Park in the City of Miami. We completed 100% Construction Documents for the Bay Walk and are currently working towards the completion of the Construction Documents for the Entry Promenade and terraces connecting the Museums to the Park. In addition to this park, we are currently working on the Matheson Plantation Village, an interpretive park within Crandon Park in Key Biscayne for the Miami Dade County Parks Department. The Miami Beach Multimodal Facility and the Surfside Community Center also offer open space design examples that our firm is proud of having successfully completed. Our firm has master planned the open space for many projects ranging from Institutional to Private Hotels and Condominiums. These include: Sunny Isles City Hall Complex, Aventura City Hall, Johnson & Wales University, Miami Beach Convention Hotel and Ritz Plaza Hotel among others. All these projects were permitted through different municipal, county, state and federal agencies as required. These ranged from historical, design and local planning boards to more complex regulatory agencies such as DERM and FDOT. We understand the process involved in permitting by impacting the natural ecology. We have dealt with issues such as decking, lighting, sea walls, mangroves, dunes and seaturtles in many of our projects. We are confident that with our experienced sub consultants we will be successful in addressing and resolving the permitting issues regarding these parks. ~~III.~~III~nlr:'lil.I:}'''I[.II-..olm;I[.:a:~;['.fi'~'~!!'l!~ 141 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) \ , ) ) ) , , . Streetscape Design: Our streetscape experience, in particular dealing with FOOT right of ways, is likewise extensive: Arthur Godfrey Road, Brickell Avenue Median (from 5th St. to 15th St.), and recently in the design and installation of new sidewalk patterns and design guidelines for 125th Street in North Miami are few Collins Avenue in Miami Beach where the project interfaces with the right of way, just as the Arlen House in Sunny Isles Beach. Our experience allows us to take any project from conception to implementation. We pride ourselves in the ability to resolve our clients' pragmatic needs with creative design solutions. We are a small design firm, which allows the principals to give direct attention to the project, start to finish. Savino & Miller Design Studio is located in North Miami in close proximity to the City of Sunny Isles Beach where we have worked on successful projects such as the Site Planning and Landscape Architecture Mas- ter Plan for the Sunny Isles City Hall and recently conceptualized a plan for an entry park in the City's Park-Garage project on 163rd Street. In this regards, we are excited in continuing the City's approach in converting underutilized commercial spaces into Community Parks. Our experience varies in scale and scope, in both private and public sectors. Specifically to this RFQ, our qualifications and experience are represented as follows: . Scope of Services: Understanding of the Issues: Location: 151 ) ) - ) ) ) ) ) ) -) ) ) ) ) ) ) ) , ) ) ) ~ , Boundaries: West side located along the bay and seawall; east side on Collins Avenue. Site: North Site (16100-16200 Collins Avenue) Is a linear site that currently has a building (scheduled to be demolished, located on the South Side of the property. On the north side of the property, a raised wall is offset from the sea wall several feet, creating a visual barrier to the water. The north part of the park site is directly adjacent to the rock bridge accessing Atlantic Isle. There is a significant grade difference in an area adjacent to the west wall. South site: Already cleared, It is also a linear site between Collins Avenue (East) and the Bay (west). A private condominium dominates the view to the south; the north side is adjacent to the Poinciana Island Entry Bridge. On the water side, there are some pylons below the remnants of a wood deck. Assets: 1. 2. 3. 4. 5. 6. 7. 8. 9. Water Views towards the bay, especially the south site. View to mangroves. Height of Poinciana bridge may allow for pedestrian linkage along the water. Bus stops on each side for added accessibility. Possible pedestrian connection at Poinciana Island Entry. Easy access from South Side Condominium. Existing Irrigation System on the South Park Site. Large open space area to create street buffer. Residential access from island homes and condominiums. - d' ~ .. .. "~~ )j' >Ii:l iIO'E ~.I;}'''l[.IINm;Iti'I!I:~;[..iil'l!I~I!!:I~. 16 ~ ) ) ) ) ) ) ) ) ) ) ) ) ) } ) ) ) ) ) ) ) ) , Constraints: 1. 2. 3. 4. 5. Collins Avenue is noisy. No crosswalks from east side of Collins Avenue. Overhead Utilities at east side boundary on Collins Avenue. Site is divided by on Poinciana Bridge. Narrow Sidewalks. Opportunities: 1. To create a connection with Proposed new Park on Sunny Isles Boulevard. 2. Enhance Sidewalk to match existing pattern on North Side of Collins to enhance the character of Sunny Isles Beach. 3. Match coral rock material as a unifying design element already existing in Sunny Isles Beach. 4. Opportunity to create two coordinated passive parks with specific programs, linked physically and visually with a shared design vocabulary. 5. Water and sunset views, activities. The Team will have the task of providing design services that studies these issues and how they can be integrated to the stated design elements, including sodded areas, walls, fences, play structure, walkways, lighting and landscaping. The entry to Poinciana Island may be re-designed to provide a North-South con- nection between the Parks. ,~'" ~' ,.1 ~'"I:.\llIII.~~.~nlr:l'l.~n:r.I[':J:II:~;('.:'.i,.a'!JI!'!J~ 17J ) ) r) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) -Additional Scope: Arlen House Streetscape on Collins Ave from Bay Drive to the Southern boundary of the City: An approximately 30' wide Landscape area between existing private property and Collins Avenue with a 7' wall separating properties from pedestrians. From conceptual sesign to construction docu ments and permitting. Opportunity: 1.To define the City's southern-most boundary by adding planting and other site improvements based on community input and budget. 2.To increase pedestrian and bicyclist safety. 3.Widen existing sidewalk. 4.To create a city gateway. Constraints: 1.0verhead Utilities 2.Limit of planting under overhead utilities 3.Private Property 4.Collins Avenue/FOOT requirements. 181 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) .Coordination: Meetings with City Staff, Commission, Sub-Consultants: We believe that communication is one of the keys for successful projects. We are accustomed to presenting our design ideas to different clients and clients' review committees, such as historic boards, design review boards, staff meetings, etc., and working with various stakeholders to achieve consensus. These meetings have been particularly important in our work with residential communities such as The Venetian Islands, Biscayne Pointe, Orchard Park, etc. in Miami Beach and other projects requiring approval such as Pinecrest Gardens Lighting, South Pointe Park, and Museum Park. The goal is to understand the City's goals in regards to the potential user and park program, long-term maintenance and material selection. .Conceptual Drawings/Renderings: After meeting with all the parties involved to establish possible programmatic requirements, and conducting a thorough site analysis. Savino & Miller will create illustrative site plans, site render ings or models with "alternative" programs as appropriate to the project: ( using Sketch-up, Rhino for 3D Photoshop, and physical models) for better client visualization and understanding of the project and to get City approval prior to commencing the Design Process. .Surveys: Under our direction and as requested by the City, our team members: Langan Engineering and JALRW Engineers, will be in charge of preparing accurate surveys that will include all underground and aboveground utilities, boundaries, and all other site elements which impact project design. \ , .Drawings & Specifications: Since 1993, Savino & Miller Design Studio has been preparing drawings (from schematic through Construction Documents) and specifications for a wide range of landscape architectural projects in the South Florida area. We are proficient in the understanding of many codes that affect this project such as: Florida Building Code, City of Sunny Isles Zoning Ordinance, FOOT regulations, DERM, etc. ) ) ) \ J Documents are prepared in Auto Cad, latest version and complimentary documents are submitted in Xcel, Sketch up, Photoshop, in-design, pdf, etc. as required. Documents can be placed in an FTP site, e-transmitted, saved in flash drives or cd's as requested by our clients. .Cost Estimates & Feasibility Analysis: Opinions of construction cost are performed regularly by our firm. They are done in an itemized spreadsheet that corresponds to the Plans. Some projects require a cost benefit analysis in terms of resource allocation. These studies will help sometimes in phasing the projects as a requested possibility in this RFQ. .Permits: Our team members are committed to obtaining all permits necessary to build the parks. Langan Engineering will be primarily responsible for permit acquisition. .Sustainability: With our projects we like to promote sustainable practices with the following items: Plant Palette: Identify other plants/plantings that promote a unique identity to Sunny Isles Beach Materials selection, lighting and drainage solutions should take into account improving the the City Maintenance by creating design for long-term durability / low maintenance Site Furniture: Coordinate selection of site furniture to be functional but also contribute to the character and quality of the City. Paving design, & lighting to be specified for long term maintenance, and energy savings. - 191 ) ) , ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) J ) } ) We are well versed in the design and implementation of "Xeriscape" landscapes. Various methods are available to effectively conserve water and other resources, such as grouping plants by water requirements, irrigation "zoning", the design of porous pipe underground irrigation, use of gravels and native drought-tolerant plants, and mulching. Just as importantly, is the need to minimize maintenance requirements. Generally, our design documents reflect the most current techniques for low maintenance, resource-efficient landscapes. Savino & Miller Design Studio is bringing a highly qualified consultant team that will assist as required in the successful completion to this project: Langan Engineering: Is one of the most experienced engineering firms in the area. For this project they will assist by providing Surveying, geotechnical, civil, environmental and permitting and traffic engineering services if necessary Douglas Wood and Associates: Recently awarded the best Structural Engineering firm by the FI. AlA. JLRW Engineering: Electrical, Plumbing Engineering as required. They have worked in many recreational projects throughout the South Florida area. Lisa Hammer: Horticultural Consultant and Maintenance manual Consultant, who has been part of our team in many Landscape Architectural projects and with over 20 years of experience in the South Florida environment. Ken Didonato, PE: Irrigation Consultant that assists Savino & Miller in most of our projects with over 20 years of experience. We are confident that our team's proven successful experience, expertise and creative approach will pro- vide the City of Sunny Isles Beach with the highest standard of professional planning, design, and consult- ing services for developing a comprehensive vision, and implementing a great design for the new Parks for the City of Sunny Isles Beach. The following pages provide a description, scope and budget of related- project experience illustrating the team expertise in terms of parks that include the Design of Planting, Irrigation, walls, fences, Paving, light- ing, signage in different environments: waterfront, urban, passive, and active parks and a few examples of our Streetscapes. _:~;['iWiil'~'!lI!'!l~ 20 I ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) J ) ) ) ) ) ) L- .~] savinomiller DES GN STUD 0 LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE , \ \ \ I PARKS + RECREATION SURFS IDE COMMUNITY CENTER The outdoor recreation facility was commissioned to compliment the newly proposed athletic center for the City of Surfside. Water Park faeilities meet needs of all age groups, abilities, and desires for both fun and exercise. The lacilities ereate a smooth transition from interior athletie eenter. to exterior shade and sun activities, to beach access, taking full advantage of the south florida setting. Location: Serviee: Surfside, FL Master Plan, Schematic Design through Construction Phase Services for all outdoor improvements Spillis Candela 2011 $2.5 Million $2.5 Million $110,000 Town of Surfside, FL Tim Milian 305.866.3635 Barry Miller Principal Firm: Date: Project Cost: Estimated Cost: Total Fees Paid: Client: Contact Info: Project Manager: ~~\'JII[.~;.~nlr:'lillll:I."l['IINl'mI['lCI:~;[..iiJl'.a'!I!'1J~ 21~ ) ) -, ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) , 13~ savinomiller DES GN STUDIO LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE ~l[".'.........~.. "I' , . <' ~ '. . '" 1 ~ ,- ~ PARKS MUSEUM PARK Savino Miller Design Studio is part of a multidisciplinary team of world class professionals whose main task was to create a Master Plan for a new waterfront park in the City of Miami. This park will include the location of the new Miami Art Museum (by Herzog & de Meuron) and the new Science Museum (Grimshaw Architects). The intent is to create a new destination park with museums, publie gardens, water features, lawns, and a new bayfront promenade. Savino & Miller is the loeal Landseape Architect for the team and is in charge of the planting and irrigation. Location: Service: Miami, FL Planting & Irrigation through Construction Phase Services Paving & Lighting Consultation Cooper Robertson/CIVITAS on-going $10 Million City of Miami Enrique Nunez 305.416.1435 Barry Miller Nathan VanDeman Principal Firm: Date: Project Cost: Client: Contact Info: Principal in-charge: Project Manager: 2d ) ) } ) ) ) ) ") ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) r . ] savinamiller DES GN STUD 0 LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE ,f'"~ -- . ~ PARKS SUNNY ISLES BEACH PARK - GARAGE "-;,' 't"'" ,. ...,. "" . ,1'" . ...~...'~... ,- 1tI_~D ~Q.,,_,,~~! p_" . ". '.,.. ".'.".'J .1"' ",,._.. .. .d~ ,dlb; ",'. ' ~'~~H~~ Sunny Isles Beach Park/Garage is a park designed as a new community green space, ideally located at one of the major gateways to the City. Established as a joint venture between developer (who has significant condominium holdings adjacent to the park) and the City, the park provides diverse recreational activities and allows for programming large community events like concerts, games, etc. A small courtyard is located adjacent to a planned cafe, along with a waterfall, water play area and playground. Location: Sunny Isles Beach. FL Service: Master Plan thru Construction Administration Principal Firm: Axioma3 Architects Date: Ongoing Project Cost: $2 Million Client: J.Milton & Associates Contact Info: Joseph Milton 305.460.6300 Principal in-charge: Barry Miller Project Manager: Anwar Morales 231 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) 1= 1 savinamiller DES GN STUD 0 LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE PARKS KEY BISCAYNE CIVIC CENTER PARK Civic Center Park is located at the key arrival point for the Village 01 Key Biscayne, and will function as the central park/plaza space surrounded by the Community Center, Village Hall and Fire Station. The design concept is to welcome residents and visitors to the Village cultural area with a eontemporary open space which reflects the island's tropical atmosphere, while encouraging its use as a place to meet and come together as a community. In keeping with the island's geography and historic stewardship of its ecology, CCP will incorporate the use of extensive water features, native and naturalized Palms and other flowering plants, and a balanee between paving and green areas. To further encourage day and nighttime use, programming for concerts and lectures are planned, as well as a splash fountain and small ice cream vendor stand. Location: Key Biscayne, FL Serviee: Schematic Design thru Construction Principal Firm: Savino & Miller Design Studio Date: on-going Project Cost: $2 Million Client: Village of Key Biscayne Contact Info: Jud Kurlaneheek 305.365.8908 Principal in-charge: Barry Miller Project Manager: Courtney Hochman _,.a.!!!!.!!~ 24 J ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) _.:, I savinomiller DES G N STU 0 0 LANDSCAPE ARCHITECTURE I URBAN DESIGN J ARCHITECTURE PARKS PINECREST GARDENS Pinecrest Gardens, formerly the home of Parrot Jungle, is one 01 the best examples of South Florida gardens and ecology. Located on a oolitic limestone ridge, through which a natural creek still flows, the flora is a showcase of our tropical hammock environment, and diversity of vegetation. Primarily a daytime destination, the Village of Pinecrest sought to add lighting to the Gardens, to allow for the planning of evening events. The challenge was to sensitively design site lighting to enhance the garden's vegetation and open spaces, without imposing on the surrounding neighborhood residents. Location: Pinecrest, FL Service: Schematie Design, Design Development. and Construction Documents for Site Lighting. Principal Firm: Savino & Miller Design Studio Consultant: G2J Design Date: 2010 Cost: $200,000 Client: Village of Pinecrest, Florida Contaet Info: Yocelyn Galiano 305.234.2121 Principal in-charge: Adriana Savino Project Manager: Courtney Hochman 251 , ) ) ) ) ) ) ) ) ) ') ) ) ) ) ) ) ) ) ) ) ) ~ ) . : J savinamiller DES GN STUD 0 LANDSCAPE ARCHITECTURE I URBAN OESIGN I ARCHITECTURE PARKS SOUTH POINT South Point Park is designed as a dramatie, ecologically sensitive park at the south end of Miami Beaeh. The design is programmed to aecomodate both active and passive recreation, with play fields, dune and hammock zones, a playground, and a 20 ft. wide baywalk. An important goal in the Master Plan process was to integrate the park into the urban fabric of the city by strengthening and improving the two major street axes which penetrate the park space. SMDS provided consultation for Master Site Planning, paving materials and site furniture seleetion, and was the primary landscape architect for the park's planting and irrigation improvements. The fast-track design process began with Master Planning in April 2005, and was completed in March, 2009. Location: Miami Beach, FL Service: Landscape Arehitecture: Master Plan, Planting & Irrigation Improvements. and Construction Phase Services Principal Firm: Hargreaves Associates Date completed: 2009 Project Cost: $22,000.000 Client: City of Miami Beach Principal in-charge: Barry Miller ~~\'jll[.~~.~nlr.rl'~lmlfil!l:l;('i.ij'.a'l!l!Il!1 261 ) ) ) ) ) ) \ ) ) ) ) ) ) ) ) ) ) ) ) ~ ) , r savinomiller DES GN STUD 0 LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE PARKS BELLE ISLE PARK Belle Isle Park, located on the only natural island of the Venetian Islands between Miami and Miami Beach, is a major open spaee surrounded on three sides by high-density condominium buildings, and Venetian Causeway to the north. The space offered no walkways or large open spaces for play, but was mostly used by residents to walk the dogs. SMDS was asked to create a plan to aUract more residents to use the park, and responded with a plan whieh provided for a range of recreational opportunities. A large elliptical open space formed by a walkway, eoupled with a "Bark Park" and numerous small paved seating areas - located by each of the park entry/street erosswalks - allows for both passive and active play activities. Numerous existing trees and palms were preserved or transplanted to create and define the park's spaces. Location: Belle Isle, Venetian Islands, Miami Beach, FL Service: Schematic through Construction Phase Services Principal Firm: Jacobs & Associates Date Completed: 2008 Project Cost: $450,000 Client: City of Miami Beaeh Contact: Carla Dixon 305.673.7071 Principal in-charge: Barry Miller ~:I-'1['IINMitIiB:~;[..!i"..!:'~l!'~! 2d ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) \ ) r 1_11IO savincmiller DES G N STU D 0 LANDSCAPE ARCHITECTURE J URBAN DESIGN I ARCHITECTURE I ::_~ ,~~~ ,,:f~~ '~-i ~~~~~:; .r.i 1?~. 'r~ """ ,,,};7"~~:,;:=15~~~,:,V~ ~>t, "'TlI(AIUI, MASTER PLAN HOMESTEAD BAYFRONT PARK The Homestead Bayfront Park Master Plan is a comprehensive report for the renovation of Homestead Bayfront Park, one of seven designated Heritage Parks in Miami-Dade County, calling for sustainable design solutions and restoration of greenspace into a biodiverse ecological habitat. APA Goldcoast Chapter Award of Excellence 2007 Location: Homestead, FL Service: Master Plan, Site Planning, Schematic Design Principal Firm: Savino Miller Design Studio Date Completed: 2007 Master Plan Project Cost: $18 Million Client: Miami-Dade County Park + Recreation Department Contact Info: Mark Heinieke 305.755.7811 Principal in-charge: Barry Miller Project Manager: Adrianna Savino 281 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) \ , ) } ) I r ..:J ) savincmiller DES GN STUD 0 LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE CIVIC SUNNY ISLES BEACH CITY HALL Our open space design eoncept integrates the City Hall site and adjacent restau- rant into a cohesive urban setting. A large fountain embraces the eouneil cham- bers, providing a eontinuous seating area for passersby and employees alike, terminating at a small courtyard adjacent to the library. The plaza was designed to expand north as part of a future City Hall expansion project. The interplay of the shimmering water and lights on the blue mosaic wall creates a civic nighttime display. Location: Sunny Isles Beach, FL Service: Landscape Architecture: Master Plan, Sehematic Design through Construction Phase Services for planting, paving, site lighting, irrigation, and fountain improvements. Prineipal Firm: Spillis Candela I DMJM Date Completed: 2005 Project Cost: $750,000 Client: City of Sunny Isles Beach Contact Info: Jorge Vera 305.947.0606 Principal in-charge: Barry Miller J..~III.~..~nlr:'ll.I*l ['li~m;It'iI!I:lll.i.iIP.a'lll!'ll!i 29~ , ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) I~ savinamiller DES GN STUDIO LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE i!E?3DC1' ~.----I .., 1"':'.- :<- -' ~ ~.:: HOTELS & CONDOS FISHER ISLAND TOWN CENTER Town Center Plaza is the main community open space on Fisher Island. Bounded on three sides by the town marketplaee and two restaurants and to the south by the island marina, it is the perfect opportunity to create a plaza which does what great plazas do: provide a place for residents and visitors alike to eat, congregate, converse, people watch, attend concerts and other events, and experience a beautiful open spaee. The plaza's design is simple and elegant, laid out in a symmetry which reflects the surrounding architectural geometry. Large Live Oak trees are plaeed to provide an extensive shade canopy flanking the plaza, which is paved in native keystone and limestone pavers. A central lountain activates the space while providing seating, along with site furniture to encourage day and nighttime use. Location: Fisher Island, FL Service: Site Master Plan, Schematic Design thru Construction Principal Firm: Savino & Miller Design Studio Renderings: Curtis Woodhouse Date: 2010-2011 Project Cost: $ 800,000 Client: Fisher Island Town Center Contaet Info: Eric Nesse 305.336.2989 Principal in-charge: Barry Miller 301 ) ) ) } ) ) ) ) ) ) ) ) ) ) ) ) ) ) .::..J savincmiller DES GN STUDIO COMMERCIAL MIAMI BEACH MULTI-PURPOSE PARKING FACILITY The Miami Beaeh Multi-Purpose Parking Facility is an urban infill project located next to the City Hall along Meridian Avenue. Our Landscape Master Plan links the City Hall with the new facility and an existing ancillary office building along 17th Street. These buildings form a corner open space at Meridian and 17th Street. The space, now a new plaza, was re-designed as an urban shady oasis that acts as an entry courtyard to the existing office building and the new multi- purpose parking facility. Location: Miami Beach, FL Service: Master Plan, Schematic Design through Construction Phase Serviees Principal Firm: Perkins + Will Date: 2011 Project Cost: $550,000 Client: City 01 Miami Beach Client Info: Jose Gelabert-Navia 305.569.1333 Principal in-charge: Barry Miller 311 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) l r .:...: J savincmiller DES G N STUDIO LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE STREETSCAPES 41 ST STREET MIDDLE BEACH BEAUTIFICATION PROJECT The design concept is based on the importance of 41 st Street as a diverse eommunity eenter and major gateway into the heart of Miami Beach. The goal was to transform the street into a tropical eosmopolitan "boulevard," based on 41 st Street's unique geographic location and partieular functions. The design called for a sequence of spatial experiences, or "events," which were linked together by Royal Palms, flowering shrubs, and groundcovers. A landscape median was proposed for the length of the street, with new decorative paving for all sidewalks. A major element of the plan was the redesign of the Indian Creek Bridge, calling for wider sidewalks, benches, planters, and a pavilion lighthouse, acting as a gateway to the street. Location: Miami Beach, FL Serviee: Master Plan, Schematic Plans, Design Development, Construction Administration Principal Firm: Consul-Tech Engineering Date: 2005 Project Cost: $4,200,000 Client: City of Miami Beach Contact Info: George Gomez 305.673.7071 Principal in-eharge: Barry Miller & Adriana Savino 32J ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) " , TEAM ORGANIZATIONAL CHART CITY OF SUNNY ISLES BEACH . PRIME CONSULTANT Landscape Architect Savino Miller Design Studio Principal In-Charge / Project Manager Barry Miller, ASLA Landscape Architectural Landscape Architectural Designer / LEED AP Designer Courtney Jennings-Hochman Anwar Morales Master Planner / Urban Designer / Architect Adriana Savino, AlA SUBCONSULTANTS Landscape Architectural Designer Nathan VanDeman . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Structural MEP Survey, Geotech, Envi- Irrigation Horticulture Douglas Wood Johnson, Avedano, Lopez, ronmental, Civil, Permit- Kenneth DiDonato, Inc. Lisa Hammer ing & traffic Associates, Inc. Rodriguez, Walewski Langan Engineering & En- Engineering Group, Inc. vironmental Services Inc. Vice President Principal Principal/Project Principal Principal Project Manager Project Manager Manager Project Manager Project Manager Marcos Perez, PE Victor M. Avedano, PE Leonardo Rodriguez, PE Kenneth DiDonato, PE Lisa Hammer 341 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) J ) ) ) ) ',' ." ~'I I ! f . savin DES G omiller N S T U D 0 LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE Barry Miller Principal Landscape Architect www.savinomiller.com EDUCATION MAURP, University of Florida, May 1985 BLA, University of Florida, June 1979 MEMBERSHIP AND ACTIVITIES American Society of Landscape Arehitects Miami Seetion Chairman, ASLA 1992-1993 Guest Lecturer, Miami Beach Art Deco Week, 1994 Performing Arts Center Building Committee for the Performing Arts Center Trust Transportation Aesthetics Review Committee of the Metropolitan Planning Organization, 2000-2005 Speaker, Florida ASLA Conference, 2008 HONORS/AWARDS 2010 - FNGLA - Landscape Award of Excellence - South Point Park 2007 - FAPA Gold Coast Section - Award 01 Excellence - Homestead Bayfront Park 2007 - FLASLA Frederick Stresau Award of Design for La Casa de Korge 2004 - AlA Outstanding Landscape Architect of the Year Award, Miami Chapter 1999 - FLASLA Award for Marquard residence 1984 - Amelia Island Park Award, University of Florida Dept. of Architecture, for Excellence in Projeet Management and Design. PROFESSIONAL EXPERIENCE PARKS Museum Park, Miami, FL Homestead Bayfront Park Master Plan, Homestead, FL South Pointe Park, Miami Beaeh, FL Oleta River State Recreational Park, North Miami, FL John & Mable Ringling Museum Master Plan of Art, Sarasota, FL Belle Isle Park, Miami Beach, FL John D. MacArthur Beach State Park, Palm Beach, FL Veterans Park, Deiray Beach, FL INSTITUTIONAL PUBLIC FACILITY Surfside Community Center, Surfside, FL Chase Bank, Miami Beaeh, FL Aventura Optima Office Building, Aventura, FL Miami Beaeh Multi-Purpose Facility, Miami Beach, FL Fisher Island Town Center, Fisher Island, FL Christopher Columbus High School, Miami, FL Coconut Grove Library, Coconut Grove, FL 10th Street Auditorium, Miami Beaeh, FL Jewish Community College, Miami Beach, FL Sunny Isles City Hall, Sunny Isles, FL Aventura City Hall, Aventura, FL Weston High School, Weston, FL Fire Station Two, Miami Beach, FL Miami-Dade County Middle School Prototypes, Miami, FL Miami-Dade Prototype Libraries, Miami-Dade, FL Temple Beth David, Miami Beach, FL Johnson & Wales Culinary University, North Miami, FL North Miami Beach City Hall Complex and Police Facility, NMB, FL HOTELS AND CONDOMINIUMS Monarch Hotel, Bay Harbor Islands, FL Fisher Island Beach Club, Fisher Island, FL Costa D'Este Hotel, Vero Beach, FL Marriott Hotel, South Beaeh, FL The Ritz Carlton Hotel, Miami Beach, FL The Ritz Plaza Hotel, Miami Beach, FL The Crown Hotel, Miami Beach, FL The Seville Hotel, Miami Beach, FL The Parc at Turnberry, Aventura, FL Loews Convention Center Hotel, Miami Beach, FL Royal Palm Crown Plaza Hotel, Miami Beach, FL Sunset Harbour, Miami Beach, FL Portofino Ocean Parcel Master Plan, Miami Beach, FL La Gorce Palace, Miami Beach, FL Miami Beach Ocean Resort, Miami Beach, FL URBAN DESIGN - MASTER PLAN Homestead Bayfront Park Master Plan & Guidelines Report University of Miami Master Plan Competition, Miami, FL Coconut Grove Planning Study, Coconut Grove, FL Brickell Avenue Streetscape Guidelines, Miami, FL Miami Design District Landseape Master Plan, Miami, FL STREETSCAPES Venetian Isles Neighborhood, Miami Beach, FL Nautilus Neighborhood, Miami Beach, FL La Gorce Neighborhood, Miami Beach, FL Biscayne Pointe Neighborhood, Miami Beach, FL Washington Ave.lStreetscape Beautification Plan, Miami Beach, FL 41st Street Middle Beach Beautifieation Project, Miami Beaeh, FL Drexel - Espanola Way Streetscape, Miami Beach, FL Brickell Avenue Median Streetscape, Miami, FL 16th StreeUAnchor Place, Miami Beach, FL Normandy Isle Streetseape Beautification, Miami Beach, FL 127th Street Median, North Miami, FL Alton/Chase Bayshore Golf Course, Miami Beach, FL RESIDENTIAL Danguillecourt Residenee, Pinecrest, FL Schloss Residence, Golden Beaeh Sanchez Residenee, Miami Beaeh, FL Camargo Penthouse, Key Biscayne, FL La Casa de Korge, Pineerest, FL Peirson Penthouse, Miami Beaeh, FL Hirt / Fletcher Residence, Miami, FL Marquard Residence, La Gorce Island, Miami Beach, FL Subotnick Residence, Palm Beach, FL Sorren Residence, Miami Beach, FL PUBLICATIONS Planning for Higher Education. The Journal of the Society for College and University Planning. "The Design Competition and Strategy at the University of Miami". Warburton, Ralph. Vol. 17: #1; 1988-1989 Florida Architecture. 50th Annual Edition. Temple Beth David; 1988. Builder Architect. The Role of Landscape Architect. Published article, 1992. Stadt Bawelt 12, Volume 125, Welcome to Miami, p. 610-611. March 1995. At SDillis Candela and Partners. p. 58-59,61, 119, & p. 141. Edizioni Press, 2001. The Robb ReDort Colleetion: Key Biscayne Tranquility. Pg. 58-64. Stadt Bauwelt 12 Vol.125 Welcome to Miami. 610-611 March 1995. Savino & Miller Design Studio - RFQ #12-04-04 35 ') ) ) ) ) ) ) J ) ) ) ) ) ) , ) ) ) , ) ) ) ) STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF LANDSCAPE ARCHITECTURE 1940 NORTH MONROE STREET TALLAHASSEE FL 32399-0783 (850) 487-1395 MILLER, BARRY R 12345 NE 6TH AVE SUITE.A NORTH' MIAMI FL 33161 I ~-_=-':':::_-=--_.-:-':"'_---,--~__- .~.. . '.'\"A.TEOF~l9RI~~">~' AC#;bO 57J;q.5.1 , . DEPARTMENT ';OFBij'SINESS : AND~~. ,1 .:. .i' (,PRPF,Ii:S;~J~~M:~r.~etrrt,~l?N.;{~,~I.X , LA00008'66 ).~1.:f.f~~,.:;~~~ 1:00.8. ;'.~'Oir' REGIST~ImPlLANl>SCAJ?#j[~plI~E&f' '.i; ,y-::l " MI~~'~.: 1t~~(~,~!,.',~/~:t' ;. i.!'<! \. HAS,.REGISTgRED und.....th...pro.ri.ion;, of Ch.481 '\ .""l.~'.io.. dat.hrov 30;" 2013' \- L120i230\l820 ;, {', .~~.,~.' >;'~____~_~~~_;._~,_2~_/:.jL.i~.f~~t~.f;J L Congratulations! With this license you become one of the nearly one million Floridians licensed by the Department of Business and Professional Regulation. Our professionals and businesses range from architects to yacht brokers, from boxers to barbeque restaurants. and they keep Florida's economy strong. Every day we work to improve the way we do business in order to serve you better. For information about our services, please log onto www.myfloridallcense.com. There you can find more information about our divisions and the regulations that Impact you, subscribe to department newsletters and learn more about the Department's initiatives. Our mission at the Department is: Ucense EffICiently, Regulate Fairly. We constantly strive to serve you better so that you can selVe your customers. Thank you for doing business in Florida. and congratulations .00 your new license! DETACH HERE to . . ... .:. ... . . .. .. . ,,, AC#:-.6 0 q 7 9." .' .' /;~ %.- "',,-. :,' ,. ' '.' STATE,;9f,~LO~~~A.. ,,! f".; ~.i' tl"E:"PARTMENT OF~'BUSlNEs~s ,.':'AND PROFBSSIONAi. REGULATION BOARD OF., LANDSCAPE ARCHITECTURE \ ) ";.,,..... .'L", (:, ,~; c';,)".:.'" ,: ""i. .(.,' SEQ# Ir12032300820 LICENSE'NBR .<>~''tl'l~ S';!.;~,>:' 03 ,23' ,2012 ~ :(10088200} LAOOo(f866~;f;:'~>.: .:t~=.ff'~-f'>, .' ii ,., .. .i, T. h. .s.....t.ANo. 'SC. A.'PE.' ';:ARCHITECT.' ';:;'i..''';, . i,.: .1.: i(';JJ.~.'r.'I!~.;'€:... '. 't.... '\~\ .,.'....\ '.;.: '}, ,," ~'Namedbe1'6w HAS REGISTERED' N ,.q(;jt\ ';.-:"-0':,'" ~1+ "'-i\. ;~) ~~:f~~~~6~P~~~~~i~~~ ~~~<s~~i~~r~! . ,'." : ".' ',> - f' \. "" " , :,~: -'" ';.',: ~'~\r f,"i. "'. ... ~" ~'i~ 't i:> ~~"'. -,:~i., '.'; ...~,.., . ,- .' MILLER" BARRY'~:R ~;.~ ':'; " .~. i~' i .. 12345 'NE'6TH'AVE,' (. .; ..:;' ~<~'>,,,;;<i' <:I_~',)~'{.:" ,t. '. SUITE A' ". ".. (, ..", '-':> ,.. '.. NORTH MIAMI FL 33161 "ii.....O[}..Wf\.\\...<..' (. ..;' .,;~. 'l"t":~::H'''lllk1;';J-,,..~r:~ ", /" ", " 'j \',' '.' ',. .I' ~;{: ,;/ J1 ;;,;;' 0" r J ,. I" r, ;',.:' -r/ "~\'..,~~; \, -~~.~ ~~."..t... ,r,' .t'" '" ....,... " :,. t DISPLAY AS REQUIRED BY LAW . r:' . ~ . I I :. ", ,.> .. I RICK SCOTT" "'. GOVERNOR ',.. L______~_.___~____._ .' KEN LAWSON SECRETARY I -......----------.---.-.-------.-, 36 t ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) \ , :" .; d' - ," ,., '.l H , savinomiller DES I G N ST U 0 0 LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE Adriana Savino Principal EDUCATION Master of Architecture, Graduate Sehool of Fine Arts, University of Pennsylvania, 1982 Certificate of Urban Design, Graduate Sehool of Fine Arts, University of Pennsylvania, 1982 Bachelor of Architecture, Facultad de Arquitectura y Urbanismo; Universidad Central de Venezuela PROFESSIONAL REGISTRATION Florida Architect - AR 14444 NCARB Colegio de Ingenieros de Venezuela Colegio de Arquitectos de Venezuela MEMBERSHIP AND ACTIVITIES American Institute of Architects, AlA HONORS/AWARDS 2007 - FAPA Gold Coast Section - Award of Excellence - Homestead Bayfront Park 2007 - FLASLAAward of Excellenee in Design for La Casa de Korge 2007 - FLASLA Frederiek Stresau Award of Design for La Casa de Korge 2004 - AlA Outstanding Landscape Architeet of the Year Award Miami Chapter ' 1986 - University of Miami Campus Master Plan International Competition: Grand Prize 1980-82 - Consejo Nacional de Investigaciones Cientificas y Tecnologicas (CONIC IT), Venezuela, Grant Award PROFESSIONAL EXPERIENCE URBAN DESIGN I MASTER PLAN 137th Streetscape Design, North Miarni, FL 125th Streetscape Design, North Miami, FL Tarniami Canal Bridge, Miami, FL Hornestead Bayfront Park Master Plan & Guidelines Report N.E. 27th Avenue, Miami, FL 41 st Street Middle Beach Beautification Project, Miami Beach, FIL Washington Avenue/Streetscape Beautifieation Plan, Miarni Beach, FL No~h .Miami Beach City Hall Complex and Poliee Facility, NMB, FL Ball Five Star Hotel Resort Master Plan, Bali, Indonesia Brickell Village Urban and Landscape Design Guidelines, Miami, FL LaGorce Neighborhood Master Plan Improvements, Miami Beach, FL Nautilus Neighborhood Master Plan Improvements, Miami Beach, FL Venetian Isles, Miami Beach, FL Biscayne Point Neighborhood Landscape, Miami Beach, Florida Coconut Grove Planning Study, Miami, FL Coral Gables Concept Plan, Coral Gables, FL Waterfront Redevelopment Concept, Cartagena, Colombia r--"1:~'JII[.~..~nlr:'lill.l~'1[~IINlml[.a=~:r:.Iii""!"'~I!'~1 Delray Beaeh Redevelopment Plan, Delray, FL Downtown Hollywood Redevelopment Plan & Downtown Hollywood Commercial Renovation Design Guidelines, Hollywood, FL Puerto Careyes Resort Development Master Plan, Jalisco, Mexieo LANDSCAPE MASTER PLAN PROJECTS Surfside Community Center, Surfside, FL Museum Park, Miami, FL Costa de Este Hotel, Vero Beaeh, FL Belle Isle Park, Miami Beach, FL Citibank Landscape Master Plan, North Miami, FL Loews Miami Beach Convention Center Hotel Landscape Master Plan, Miami Beach, FL Johnson & Wales Culinary University, North Miami, FL Royal Palm Hotel, Miami Beaeh, FL North Miami Beach City Hall Complex and Police Facility, North Miami Beach, FL Oleta River State Recreational Park, North Miami, FL John & Mable Ringling Museum Master Plan of Art, Sarasota, FL John D. MacArthur Beach State Park, Palm Beach, FL RESIDENTIAL LANDSCAPE ARCHITECTURE Schloss Residence, Golden Beaeh, FL Garza at Apogee, Miami Beach, FL Ruimy at Apogee, Miami Beaeh, FL Schloss Residence, Golden Beach, FL Yanopoulos Residence, Miami, FL 6855 Sunrise Residence, Miami, FL Korge Residence, Miami, FL Hirt-Fletcher Residence, Miami Beach, FL Saul & Jane Gross Residenee, Miami Beach, FL Marquard Residence, Miami Beach, FL Sorren Residence, Miami Beach, FL RESIDENTIAL ARCHITECTURE McDonough Residence, Miami Beach, FL Dietch-Kulvin Residence, Surfside, FL Sehmidhoffer Residenee, Miami Shores, FL John & Becky Whyall Residence, Miami Shores, FL Feld Residence, Miami Beach, FL Miedema Residence, Miami Beaeh, FL Rosenthal Residence, Coral Gables, FL Chuck & Lisa Bergwin Residence, Miami Beaeh, FL Saul & Jane Gross Residenee, Miami Beaeh, FL Greenberg Residence, Miami, FL COMMERCIAL /INSTITUTIONAL I OTHER Tamiami Canal Bridge Tender House, Miami, FL 41 st Street Bridge over Biseayne Waterway & Indian Creek, Miami Beaeh, FL Johnny Solornon Plastic Surgeon, South Miami, FL Savino & Miller Design Studio, North Miami, FL Tepuy International, Coral Gables, FL PUBLICATIONS The Robb Report Collection: Key Biscayne Tranquility. Pg. 58-64 T.he Journal ?! the Societv of Colleoe and Universitv Planning. De- sign Competition at the University of Miami. Walburton, Ralph Vol. 17 NO.1: pp20-21: 1988-1989 Stadt Bauwelt 12 Volume 125, Welcome to Miami.pp610-611 March 1995 ' At Spillis Candela and Partners, Edizioni Press. Italy. p. 58 59 61 & 118. 2001 ' , , 37 J ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN (850) 487-1395 1940 NORTH MONROE STREET TALLAHASSEE FL 32399-0783 SAVINO-MILLER. ADRIANA SAVINO & MILLER DESIGN STUDIO 12345.NE 6TH AVE SUITE A NORTH MIAMI FL 33161 ~!\;~;::!l:{"0:~~:t'Ji~j~:;;:'"~''J.''''''':''''':;.''' ....~.......:. ':~i~~~i~'.&:::&,~!g,;;:',::;':'::~~; .,.... / Congratulatio~~! With this fi~nse you become one of the nearly one million Floridianslicensed by the Department of Business and Professional Regulation. Our profesSionals and businesses range from arChitects to yacht brokers, from boxers to barbequ\3 restaurants, and they keep Florida's economy strong. . . Every day we work to improve the way we do businesS in order to serve you ~er For information about our selVices, please log onto ~.myftOrfCfallcense.c:o'm. : Thereyo~ can find."lore information about our d"lVisloils and the regulations that . impact you, subsalbe to department newsletters and learn more about the .Qepartmenfs initiatives. oUr inission at the Department is: license EfficlOOUy, Regulate Fairly. We ' constantly strive to selVe you better so that you can serve your customers. . Thank you for doing business in Florida, and CongratUlations on your new license! [ __.... .. _____" ......^"...................~~!.~~.IJ__~ERE 1IIJtm:.~nlr:rl.l;}..'1[.II~m;I[..a:~;(..;il'..aI!I!:.!~ 38 ~ ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) , i!i.1~lZ~fl~~">f',i".'.;' ,:,~:'7n ru ~ savinomiller D 5 D G N s u E T LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE Courtney D. Jennings-Hochman Associate EDUCATION Master of Landscape Architecture, Florida International University School of Arehitecture, 2008 Bachelor of Arts - Magna cum Laude, Anthropology and Art, Metropolitan State College of Denver, 2001 Certifieate Archaeological Field Work, L-Universita ta' Malta, 2000 PROFESSIONAL ACCREDITATION LEED AP - Green Building Certilicate Institute MEMBERSHIP AND ACTIVITIES American Society of Landscape Architects American Planning Association Delta Epsilon Iota HONORS I AWARDS 2008 - FLASLA Student Award Finalist 2005-2007 - FlU School of Architecture Graduate Assistantship 2000-2001 - Colorado Scholar's Award in Anthropology PROFESSIONAL EXPERIENCE URBAN PLANNING & DESIGN Greynolds Park - Miami, FL Matheson Plantation Village - Key Biscayne, FL Civic Center Park - Key Biscayne, FL 137th Streets cape Design - North Miami, FL 125th Street North Miami Improvement Project - North Miami, FL Biscayne Point Streetseape Improvements - Miami Beaeh, FL Venetian Islands Capital Improvements - Miami Beach, FL INSTITUTIONAL I OTHER Sunny Isles Beaeh Gateway Park - Sunny Isles Beach, FL Monarch Hotel - Bay Harbor Islands, FL 420 Lincoln East Garage - Miami Beaeh, FL Aventura Optima Tower - Aventura, FL Surfside Community Center - Surfside, FL Pinecrest Gardens - Pinecrest, FL Chase Bank - Miami Beach, FL Coconut Grove Library - Coconut Grove, FL Fisher Island Town Center - Fisher Island, FL Jewish Community Center - Miami Beach, FL Ritz Plaza Hotel - Miami Beach, FL Tamiami Canal Bridge Control House - Miami, FL RESIDENTIAL LANDSCAPES Cisneros Residence - Coral Gables, FL Galbut Residence - Miami Beaeh, FL Schloss Residence - Golden Beach, FL o OTHER PROFESSIONAL EXPERIENCE (City of Opa-Locka) City of Opa Locka Beautification Project - Opa Locka, FL City Hall Historic Preservation - Opa Locka, FL Community Gardens - Opa Locka, FL Master Planning - Opa Locka, FL (Burt Hill Dubai) Adas Private Villa - Dubai, UAE Azzam Private Villa - Dubai, UAE Oar Abla Desert Resort - Dubai, UAE Hassan Private Villa - Dubai, UAE Mafraq Hospital - Abu Dhabi, UAE Motorcity High Street - Dubai, UAE Rennaisance Hotel - Dubai, UAE SEHA Health Community - Abu Dhabi, UAE Union Properties Executive Park - Dubai, UAE Union Properties Headquarters - Dubai, UAE (Arquitectonica - GEO) Miami Art Musueum - Miami, FL Qatari Diar Resort - Sharm el-Shaikh, Egypt (Independent Consultation) Fairchild Tropical Botanic Garden - Miami, FL Sofitel Hotel - Dubai, UAE 391 ) ) ) ) ) ) a . l ) ) ) W l- ) ::) ...I >-- ) I- eI) <( ~ ~ p:: - tJJ tJJ ::E I- Z u Z tJJ ) tn I-< tJJ I-< U) V) 0 u Z >-- ) -< ~ V) z C - p:: ~ ~ U) l>-o ~ ) - ~ :x: z V) Z .- U) z p:: I-< .:i ~ tJJ -< 5 c: W Cl Cl p:: ] 0 u. ...l -< ~ - 0 LL ::> l1l Z , ...l . - Z ~ ~ :a ~ c: 0 l1l Cl ~ ) 0 z :x: ...l I-< \Xl I-< ~ I-< a=: \Xl ::> -5 -< CD -< p:: u. ~ i ) U :x: z ~ 0 ] I-< D.. z - ~ u. Z tJJ .'" V) 0 0 \Xl t LL l1l ., V) DDDDu ~ \Xl C l1l j:: p:: I ... Cl ~ - ~ -< DDDDm l- I-< tJJ W Cl I-< (;' p:: >-. :x: l1l Z Cl 1 a=: tJJ ...l l1l DODD\!) u I-< I- ~ tJJ ~ ::E tJJ W >- Cl - 0 Pol ...l ... .m tJJ ...l '-" ~ > C Z l>-o ] U l1l ~ Z p:: l1l ~ '" ~ ~ l1l .f:: :x: W "" ~ j (.!) :x: :x: ...l V) U a=: I-< ::> l1l j . , -< Cl Z ~ u. ~ 1:: V) z V) ...l -< U V) - :x: j:: l1l -< g U U I-< ] C -< u Z <( p:: ::> tJJ E ...I ::J I-< ::E V) V) - z p:: z ::) @) 0 0 0 0 ::E u. p:: C ~ 1 m \Xl Cl > Cl Pol Z W >-- p:: \Xl U - z . . ~ ::> Cl W 0' Z W ...I Pol -< ~ p:: w a=: (.!) ~ E a 40 I ) ) ) } ) ) ) ) ) ) ) ) } ) ) .~lW:~}I.t~ ~~~-~~"#~~:p~{ 'i:-.~~-~t1 tw' t savinaniller DES I G N ST U 0 0 LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE Anwar S. Morales Associate EDUCATION Master of Landscape Architecture, Florida International University School of Architecture, 2009 Bachelor of Science - Agriculture/Horticulture, University of Puerto Rico, 2001 MEMBERSHIP AND ACTIVITIES American Society of Landscape Architects ) ) HONORS/AWARDS 2010 - USGBC Natural Design Competition Third Place 2007 - David & Judith Blumenthal 3D Award 2006 - AlA Miami Honorable Mention Award 2005-2007 - Makemson Scholarship Recipient PROFESSIONAL EXPERIENCE URBAN PLANNING & DESIGN Greynolds Park - Miami, FL Matheson Plantation Village - Key Biscayne, FL Sunny Isles Beach Gateway Park - Sunny Isles Beach, FL Museum Park - Miami, FL Pioneer Boulevard - North Miami, FL INSTITUTIONAL / OTHER Indian Creek Hotel - Miami Beach, FL Gale Hotel - Miami Beach, FL Belle Isle Plaza Hotel - Miami Beach, FL Chase Bank - Miami Beach, FL Ritz Plaza Hotel - Miami Beach, FL RESIDENTIAL LANDSCAPES Heisel Residence - Miami Beach, FL Cisneros Residence - Coral Gables, FL _i'.l!'!!!!'!!~ OTHER PROFESSIONAL EXPERIENCE (WRT) Arsht Residence - Coral Gables, FL KM Plaza - Miami Beach, FL Fraser Centre at State College - State College, PA (Arquitectonica - GEO) Biscayne Landing - North Miami, FL (Independent Consultation) Guerra Residence - Hormigueros, PR Sanchez Residence - Sabana Grand, PR L1uch Residence - Lajas, PR Falletti Residence - Hormigueros, PR Sofitel Hotel- Dubai, UAE 411 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) } ) } ) it' ,~-"',,,'~;' i,~,,'.:n: _';' .,~--=~ l~ l savinomiller DES G N ST U D 0 LANOSCAPE ARCHITECTURE I URBAN OESIGN I ARCHITECTURE Nathan VanDeman Associate EDUCATION Bachelor of Scienee - Landscape Architecture, Purdue University, 2009 MEMBERSHIP AND ACTIVITIES American Soeiety of Landscape Architects Purdue Alumni Association HONORS/AWARDS 2009 - Technology in Landscape Architecture Teacher Assistant 2009 - Donald Molnar Scholarship Finalist 2007 - Purdue Resident Assistant 2004-2009 - J Bonner Wampler Alumni Scholarship Recipient PROFESSIONAL EXPERIENCE URBAN PLANNING & DESIGN Museum Park - Miami, FL Sunny Isles Beach Gateway Park - Sunny Isles Beach, FL INSTITUTIONAL / OTHER Indian Creek Hotel - Miami Beach, FL Aventura Optima Tower - Aventura, FL Ritz Plaza Hotel - Miami Beach, FL Gale Hotel - Miami Beach, FL RESIDENTIAL LANDSCAPES Galbut Residence - Miami Beaeh, FL ~liNl'mI[.:a:l;[."ii.,.a'!'JI!'!'J. OTHER PROFESSIONAL EXPERIENCE (HGOR) City of Decatur Streetscape - Decatur, GA Alexander Memorial Coliseum, Georgia Tech Basketball Facility - Atlanta, GA University of Georgia Law Sehool - Athens, GA Berry College Residenee Village - Rome, GA Oglethorpe University Student Center- Atlanta, GA Coca-Cola Headquarters Renovation - Atlanta, GA Franklin Ranch Park & Athletic Park- Franklin, TX Beijing Manor House - Private Residence - Beijing, China (Guzzardo Partnership) University Plaza & Streetscape - East Palo Alto, CA Loch Lomond Mixed-use Development, Marina & Wetland Preservation - San Rafael, CA Del Monte Cannery Mixed-use, Transit Oriented Development - San Jose, CA San Mateo LEED Exeeutive Park - San Mateo, CA Bakery Lofts - Emmeryville, CA 4d ) ) ) ) ) ) ) ) ) ) ) ) ) ) , , ) ) L:eona rdo.\ Rod rig~uez,~ PE~ Seri iar, Proje'et~Ma>riager ~PrdjectManagemenl,Site Engineering I Lana ~'l . . piI ~~'. tJIl ~~; ~ ~..7l 9~~i " ~. om!~ " III J,. 5I!~: Development.;,Hyi:fraulics &'Hydrology~ y .. 20 years in the industry - 4 years with Langan Mr. Rodriguez has over 20 years of Civil Engineering experience of which approximately seven years have been as project manager. He has been the primary point of contact for public and private sector clients for projects ranging from Municipal utility improvements, roadway resurfacing and reeonstruction, as well as County local and area wide drainage improvements. Mr. Rodriguez has spearheaded the Environmental Resource Permit (ERP) and Corp of Engineer Dredge and Fill permitting efforts on numerous projects. He is intimately familiar with the Miami-Dade Water and Sewer Department (MDWASD) standards and specifications as well as with the permit process through the Miami-Dade County Department of Planning, Environmental and Regulatory Affairs (PERA), the City of Doral Works Department, the South Florida Water Management District, the Florida Department of Environmental Protection and US Army Corp of Engineers. Selected Projects Miami Dolphins Water Park at SunLife Stadium, Miami Gardens, FL Miami MetroZoo Amphitheater, Miami-Dade County, FL The Promenade at Coconut Creek, Broward County, FL Banco Santander Tower, Miami, FL 1800 Club, Miami, FL BelAire Drainage Improvements, Miami-Dade County, FL Bellagio, Miami, FL Biscayne Gardens Elementary, Miami-Dade County, FL Blue Lagoon Lake Fill, Miami, FL Blue Mountain Resort Due Diligence, Blue Mountains, Canada Broward County Government Center Redevelopment Project, Fort Lauderdale, FL Brownsville Middle School, Miami-Dade County, FL City of Dania Comprehensive Drainage Plan, Dania, FL City of Miami Pavement Rehabilitation, Miami, FL City of Miami Pavement Rehabilitation, Miami, FL Compost America Facility, Medley, FL Continental Hotel, Miami Beach, FL Country Walk Drainage Improvements, Miami, FL Cutler Cay, Miami, FL Fontainebleau East and West, Miami, FL James Archer Smith Park, Homestead, FL Margaret Pace Park Shoreline Stabilization, Miami, FL Meadow Wood Cedar Creek Drainage improvements, Miami-Dade County, FL MIA Supplemental Storm Water Treatment Units, Miami, FL NW 2;t<l Avenue Water Quality Improvements, Opa-Locka, FL Orange Bowl Demolition, Miami, FL Ouster Corp Storage Facility, Homestead, FL Park Square at Doral, Doral, FL M. Sc., Environmental Engineering Florida International University B. Sc., Civil Engineering University of Miami Professional Registration Licensed Professional Engineer, Florida 1IIm~.~nlr:'lilt.I;}:l['IIN{mI[.:a:l:l'.;iJl'Z'~I!'~' 431 ) ) ) ) ) ) ) ) ) ) ) ) Leonardo Rodriguez, PE South Broward Drainage District Basin 9 & 10 Comprehensive Plan, Broward County, FL South Broward Drainage District Plan Review, Broward County, FL SREF Sile-Civil Engineering RevieINS for MDCPS, Miami-Dade County, FL The Colonnade, Miami, FL University Lake Village, Lee County, FL University of Miami Merrick and Memorial Building Water Main Extension, Coral Gables, FL University of Miami Miguel B. Fernandez Entrepreneurship Building, Coral Gables, FL University Village Phase-II Water Main Extension, Coral Gables, FL Villas at Fairway, Miami, FL 1 ) ) J ) - ~ - 'f' ~.<." ".~,' '~i_, Technicill'Excellence ;\ Pracil~~1 Experlen6e'" --i:?I '.:-'-~, i?:~ Client' Res~onsiveness' ~ LAN6ANJ ~ ,~ ~ _iP.a'!lI!'!l1 44 ~ ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) , , ,\; III Eric,B. Schwarz,'PE, LEED~~P, ~ ~SeniortAssociate' ~'_' :t Rroject'Mimagement,-,Site'Engineering I Land .~ c- ,m- AO _.~k_L'i ,'~" ~",:_"of-'t;~, ;r, :" '>.:1' 00"-1 ,f1 !lst.l. Developmentf HydraUlics & Hydrology :ll ;rJ 19 years in the industry -14 years with Langan Mr. Sehwarz has over fifteen years experience in civil and environmental engineering projects. His specialization includes site/civil land development engineering, hydraulics and hydrology, storm drainage, water distribution and sanitary sewerage eonveyanee design. Mr. Schwarz's experienee includes design of sites for new commercial and residential development, construction support and coordination, environmental investigation of contaminated sites and design of remediation systems for eontaminated soil and groundwater. Selected Projects Miami MetroZoo Amphitheater, Miami-Dade County, FL Miami Free Zone, Miami-Dade County, FL The Promenade at Coeonut Creek, Broward County, FL Caseyco Corporate Center, Broward County, FL Thoroughbred Estates, Okeeehobee County, FL Santa Maria Golf & Country Club, Panama City, Republic of Panama Guaealito de las Islas, Niearagua Punta Clara, Guanaeaste, Costa Rica Northwest Florida Renewable Energy Center, Port St Joe, FL Tallahassee Renewable Energy Center, Tallahassee, FL Market Square Shopping Center at Tampa Palms, Hillsborough County, FL Seasons 52, City of Tampa, FL United States Border Patrol, Broward County, FL Biseayne Gardens Elementary School, Miami-Dade County, FL Tampa Palms Area 3 Park and Ride, Hillsborough County, FL Wiles & Lyons Roads Turning Lanes Improvements, Broward County, FL Cullum Road & Banks Road I mprovements, City of Coconut Creek, FL Hills of Lake Mary Professional Centre, Seminole County, FL Caseyco Corporate Center, Broward County, FL Sun N Lakes Estates Unit 12, Sebring, FL Sunny Hills Units 12-15, Washington County, FL Thoroughbred Estates, Okeechobee County, FL Deering Bay Property Owner's Association, Miami-Dade County, FL Equity Residential- Mu~iple Sites Throughout Florida Mariner Park Centre Parking Lot, Miami Gardens, FL Ryder Transportation Services, Davie, FL Selected Publications, Reports, and Presentations International Council of Shopping Centers (ICSC) Centerbuild Conference, Phoenix, AZ, Dee 2007 Speaker/Panelist - Mixed-Use Going Green; a case stUdy on the first LEED certified mixed-use development in Florida Urban land Institute (ULI) Fall Meeting, Miami Beach, FL, October 2008 B.Sc., Civil Engineering University of Delaware Professional Registration Licensed Professional Engineer, New Jersey, Pennsylvania & Florida lEED Accredited Professional Affiliations International Council of Shopping Centers (ICSC) American Resort Development Association (ARDA) Construction & Design Council. Chairman 2010-2011 Construction & Design Council, Vice Chairman 2009-2010 Sustainability Task Force leader 2008-2009 United stales Green Building Council (USGBC) Congress for the New Urbanism (CNU) L.AN6AN - 451 ) ) ) ) ) ) ) ) ) ) l ) ) ) ) , ) Eric Schwarz, PE, LEED AP Speaker - Tuming Marginal Land into a World Class Destination Resort American Resort Development Association (ARDA), Developments Magazine, July 2009 Authored Article - "More on the New Sustainability Task Force" Seminar - "Repositioning Troubled Master Planned Community and Resort Projects';The Signature Grand, Davie, FL, November 2009 Seminar Moderator Speaker - Engineering Due Diligence & Site Feasibility Analysis OPAL Financial Group Real Estate Investors Summit, Trump Inti Beach Resort, Sunny Isles Beach, FL Speaker & Panelist - "Resorts, Hotels and Master Planned Communities.. ..Buying, Repositioning of Troubled Projects" Panelist - "Current Trends in the Caribbean, Cuba & Latin America" Eric BI of'._<l'fIQ~~ .' ~~. q. , ("'ugtu~et$ ~~:~:~ P.E'. fl,r'i, Is LICENSED AS A PROFESSIONAL ENGINEER UNDER CHAPTER 471, FLORiDA STATUTES EXPIRATION: 2/28/2013 P.E. L1c. No: AUDIT No: 228201312478 62196 ..:" R"P''":'~'" ~ ~A i\lli~N J -:r -.- -"l1IIV""" ~ -,;J- Technical Excellence Practical Experience 461 ) ) ) ) ) ) ) ) ) ) ) ) , ) ) ) ) ) ) } r I fMichael'Carrl"PE Senior Staff Engineer ~l!~ 1W,~.!~ermg b~jlQ~'I;>'e,!,~I()~me'!t~,!;;Iy~<!-faID!~t&~ HyCfrology ~,! ~ 6 years in the industry - 6 years with Langan Mr. Carr has six years of experience in civil engineering projects. His specialization ineludes site engineering, hydraulics and hydrology, storm drainage, water distribution systems and sanitary sewerage (including Low Head Pressure systems, gravity, and pump stations) conveyance design. B,Sc.. Civil Engineering Penns~ania State University Mr. Carr's experience includes land development design for sites of new commereial and residential development and redevelopment, regulatory permitting processes, and construction support and coordination. A listing of example projects that Mr. Carr has been involved with is provided below. Professional Registration Licensed Professiooal Engineer. Florida Selected Projects Sunny Hills, Units 12,13,14, and 15, Washington County, FL Medieal Offiee Building Complex, Lake Mary, FL Biomass Power Plant, Tallahassee, FL Market Square Shopping Center at Tampa Palms, Tampa, FL Cooper City Commeree Park, Cooper City, FL Sun'n lake Estates of Sebring, Unit 12, Highlands County, FL Promenade at Coconut Creek, City of Coeonut Creek, FL Heartland Ranchettes, Okeechobee County, FL Boulder Run, Wyckoff, NJ . . \~&~ of <!'fIU17-l} 7 Jnilrb n!.. ' "Wnginl!tts q. r .. . Michaelfl '.arr, P.E. IS LICENSED AS A PROFESSIONAL ENGINEER UNDER CHAPTER 471, FLORIDA STATUTES EXPIRATION: 2/28/2013 'P.E. LIc, No: AUDIT NO: 2282013132391 72424 ~ LA,NEiAi/V--:-t v~_~ ~ ?\' Technical Excellence Practical Exp;erlence Client Responsiveness ~ ~ - ...... -- ........_~ 471 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) LANGAN -.. ~.l;;~'~~""--- ;'41 ~ ~f ~< ~J ~., ~~ :4' '~'>';l:~:'~~~~. ~~.,,~k,~:" ~y:;*~~::~:,;" ~~_~}~;,,;,,:~~~ ~~~f; ~:~:~~ ': ':!~l~_ _:: ,1~!.,;~ MIAMI DOLPHINS'WATERRARKATSUN'L:IEI:1!S;t ADIU M, ~-,,;L,~;~~'~.:~'-.::: ~i,)o~~~~ ~:-"o}.'_ *~-::~~~:~~}~~~',~~_; ~~,.~::~~~~*!;~~ ~;'1:~};~: - y~c,: t~~':,t@~ ~i4fi~.-~ -~~~~~~ ';~ ~:~/ri\ff~~:~.~_~ ~ ;:'~i 'i';; {J, fA ~_:%:: SERVICES: . Parking Facility Design . Transportation Planning . Traffic Engineering . Parking Design . Event Operations Planning LOCATION: Miami Gardens, Florida CLIENT: The Related Companies ) li."'Rl'JIII.~;.Ifj"lr:TI..r;I.."l[~li"Ncmtri1!!l:l;[..!i t'.all! 1!1l!1 Langan is providing Traffic and Parking due diligence services to The Related Companies to assist in the preliminary through schematic design planning phases of the Dolphins Water Park project. The waterpark will be located in one of the existing Sun Life Stadium parking lots. Our transportation scope was developed to provide planning and engineering support services with respect to Access Management, Vehicular and Pedestrian Circulation, as \Nell as Parking Allocation and Management. To date for this project, Langan has: . Designed a revamped Stadium parking layout of approximately 20,000 spaces in order to absorb the1,500 spaces to be lost by the development of the water park. . Evaluated zone specific parking for tailgating, redistributed ADA compliant spaces to attain improved access to the stadium, and relocated the bus drop-off and pick-up sites to provide better circulation. . Examined impacts of game day travel patterns as a result of new development in the vicinity of the Stadium. . ReviellVed the current operations plan with the Stadium Management team and developed suggestions for improvement. . ReviellVed the site access configuration and made recommendations for roadway improvements, inclUding identification of areas that may require signalization. 481 ) ) ) ) ) ) ) ) } ) ) ) ) ) ) ) \ , \ , \ , LANGAN ;~<. " i;~ -"'~ ,f< ~; ii~ 1.,'9. ~1!" ~ ~ -.::: ,.<: SERVICES: . Design/bui/d Project . Gas Plant Remediation . Lanc{fill Engineering and Closure . Stormll'ater Design . Geotechnica/ Studies . Construction Inspection LOCATION: Tallahassee. Florida CLIENT: WRS Infrastructure & Environment, Inc. It is one of the most historically significant locations in Tallahassee, not to mention the entire state of Florida, and the process to return it to its citizens as a beautiful urban recreation site is now undelway. The City of Tallahassee's Cascades Park Cleanup project has been completed. This is a critically impOt1ant step that will help transition the site into a multi-use downtown park. Langan was a sub-contractor to WRS Infrastructure & Environment, Inc. for design, engineering and oversight services for the $8M Cascades Park Remediation Project, a coal gasification plant and landfill Superfund site that has been remediated by the City of Tallahassee under an Administration Order of Consent with USEPA. Langan prepared the Removal Action Work Plan which received USEPA approval in a one month time period. Design specifications and drawings were developed for the removal of in excess of 80,000 cubic yards of contaminated soil, and the construction of a low permeability liner within the excavated area for future use as a stormwater management facility at the fortner plant site. At the landfill site, Langan conducted geotechnical investigations and developed engineering specifications and drawings for the removal action which involves sediment removal from an adjacent creek, installation of a 400 linear foot box culvert within the creek, installation of a geosynthetie clay liner (GCL) cap on the landfill surface, and installation of a GCL along the landfill embankment, totaling 5,720 square yards. The box culvert was designed to buttress the steep landfill slope adjacent to the creek. Langan also provided engineering oversight during the earthwork and liner installation at the former plant site, and provided oversight during the box culvert and GCL installation at the landfill site. ~lm[[i'J!l:~;:..!j".!I'l!l!'l!. 49~ ) ) ) ) ) ) ) ) ) ) ) ) , ) ) ) ) ) ) State of Florida Department of State I certify from the records of this office that LANGAN ENGINEERING AND ENVIRONMENTAL SERVICES, INC. is a corporation organized under the laws of New Jersey, authorized to transact business in the State of Florida, qualified on March 16, 1993. The document number of this corporation is F93000001369. I further certify that said corporation has paid all fees due this office through December 31, 2012, that its most recent annual report was filed on January 4,2012, and its status is active. I further certify that said corporation has not filed a Certificate of Withdrawal. Given under lilY hand and the Great Seal of Florida, at Tallahassee, the Capital, this the Fifth day of January, 2012 ~o Secretary of State Authentication ID: 800216222068-01 0512-F9300000 1369 To authenticate this certificate,visit the following site, enter this 10, and then follow the instruetions displayed. https:/Iefile.sunbiz.orglcertauthver.html _:l;:..iiJ'.a'Jll!'Jl~ 50] ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) MARCOS PEREZ, P.E. LEAD STRUCTURAL ENGINEER I VICE PRESIDENT EXPERIENCE Mr. Perez has twelve years of experience providing structural engineering in South Florida. In his time at Douglas Wood Associates, Mr. Perez has worked on numerous complex projects, including the award winning Soundscape and Exostage Park in Miami Beach, the proposed sculpture-pavilion for Downtown Doral Park, and the Miami Art Museum. Mr. Perez has provided structural engineering services for numerous municipal, park and recreation projects. These projects include Soundscape and Exostage Park in Miami Beach, the proposed sculpture-pavilion in Downtown Doral Park, Lifeguard Facility at Haulover Beach Park, Miami Art Museum, South Side School and Hardy Park in Fort Lauderdale, Miami-Dade Fire Rescue Training Facility, Wynwood Community Center and Historic Hampton House. In his time at Douglas Wood Associates, Inc., Mr. Perez has worked on numerous museum and cultural arts projects, including the foundation design for the proposed Miami Art Museum, structural rehabilitation and flood proofing of portions of Vizcaya Museum and Gardens, structural design and inspection of Colony Theater in Miami Beach, and renovation to the Lehman Theater at Miami-Dade College. Mr. Perez also excels in computer applications for structural engineering, and he is expertly adept in the use of complex finite element analysis programs, such as ET ABS and SAFE. He has even written a number of structural design programs which have proved to be accurate, reliable and efficient design tools for the firm. Mr. Perez's project experience includes commercial, residential, municipal and aeronautical buildings. Mr. Perez has successfully worked with the full spectrum of structural systems, such as pile foundations, shallow foundations, reinforced concrete, precast concrete, post- tensioned concrete, masonry, steel, composite systems, aluminum and timber. Mr. Perez has successfully performed project duties from conceptual design and feasibility studies through analysis and design, preparation of construction documents, construction administration and -inspection. o OM o U I O~ ~uf cnLLl :i~ C)U ::JO Om o <( V STRUCTURAL ENGINEERS 1M o 12 Years of Local Experience University of Florida, MSCE, with Honors University of Miami BSCE, with Honors, Honors Transfer Program Scholarship P.E. in Florida Mr. Perez also possesses the ability to communicate clearly, coordinate and organize. These qualities have serviced him in his successful project management efforts. DOUGLASWOOD.BIZ fL~l.l..;.~nlr:ril.I~~['IINtml['JI:I:l;[..ii".!"'1!I!:'1!~ 511 ) ) ) ) ) ) ) J ) ) ) ) ) , ) \~t~ X::[5~JflQ~ ~: . "........ . :tl-q. o ~lIlltb lI(:~;~c,f ~i~~~.~ngiUtetS :' ;.<;':~,,~,j~. .. ;. .~Jidt!'~;:h _~7' ... ~ ~ ,.....i" .,.~..!." 11-, .". '; '.. ~ '-"lie'.' '''','' ._~.." .".,." M . -;r.:',.>; ;'.:".:.'" .-r . x:;:" P E a rCQ~!f",: fi;~: . ... '.~ez, · · .. "-'1-~~~;;:.:~;.j~7~(; ~ . . .<: \ . ~ .. ...>.:Jr~ ':.~:i-. .! .~<. .. . . .' . . . . IS LICENSED AS A PROFESSIONAL ENGINEER UNDER CHAPTER 471, FLORIDA-STATUTES. EXPIRATION: 2/28/2013 P.E. LIc. No: AUDIT No: 228201320717 67422 111111111!lnl':nm'[':J:I:l;{..iit'.aU!I!:e:l'l~ 52~ ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) . . .. QUALIFICATIONS FOR THIS CONTRACT' . {Present as many projects as requested by the agency, or 10 projects, if not specified. , ~ - . . .-.- - . - "-'CompleteoneSectionFforeachproject)"~:>.' "--. . ~ L. 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (Cilyand State) 22. YEAR COMPLETED Haulover Beach Park Miami-Dade County, Florida PROFESSIONAL SERVICES 2012 CONSTRUCTION (if applicable) 2012 (est.) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade County b. POINT OF CONTACT NAME Mr. Richard Heisenbottle R.J. Heisenbottle Architects, PA 2199 Ponce de Leon Blvd., 4th Fir Coral Gables, FL 33134 c. POINT OF CONTACT TELEPHONE NUMBER Tel. 305-446-7799 ex!. 14 Richard@riha.net 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cosl) Scope/Description; Multiple buildings with a total area of 22,000 square feet, at different phases of completion, under construction and bidding, our recent work at Miami-Dade County's Haulover Park consists of the Beach & Marine Safety Facility (currently in bidding and a joint project of the Park & Recreation Department and the Fire Rescue Department), the Marina Dock Master Building (under construction) and four comfort stations (completed). The Beach & Marine Safety Facility features a nearly 80 ft. tall observation tower ("lighthouse") and includes a training room, lounge, offices, locker rooms, exercise room, conference room, storage and vehicle storage. The Dock Master Building also features a smaller "lighthouse", and the building includes a multi-purpose room, restrooms, offices, conference room and other support spaces. Estimated Construction Cost: $7 Million 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Douglas Wood Associates, Inc. Coral Gables, Florida Structural Engineering (1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and Slate) (3) ROLE g. h. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE _iP..a'~I!'~. 53 ~ ) ') ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) \ , .~ \ I \ I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED~ QUALIFICATIONS FOR THIS CONTRACT - ,- (Present as many projects as requested by the agency, or 10 projects, if not specified. ; . - '. Complete one Section F for each project) - -, ~ , ~ -.-. ~,. , - 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Miami Beach Soundscape (Lincoln Park) Miami Beach, Florida PROFESSIONAL SERVICES 2011 CONSTRUCTION (if applicable) 2011 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Miami Beach b. POINT OF CONTACT NAME Prime Consultant & Lead Designer Ms. Jamie Maslyn Larson West 8 New York 333 Hudson Street, Suite 905 New York, NY 10007 c. POINT OF CONTACT TELEPHONE NUMBER Tel. 212-285-0088 i.maslvn@west8.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Scope/Description; Three acre urban park adjacent to the Frank Gehry-designed New World Center (symphony hall), This park supports a multitude of day and night uses, including a state of the art sound and projection system which projects live concerts and other artistic programming on to the 7,000 square foot wall of the symphony hall. The park is complemented by a mosaic of white concrete sidewalks, seating walls and iconic aluminum pergolas (sculptural abstractions of cumulus clouds rising to a height of up to 22.5 feet) supporting flowering bougainvillea vines. Douglas Wood Associates, Inc, provided the complete structural engineering services, including schematic design and design development consultation, analysis, design, preparation of construction documents, assistance with bidding and permitting, construction administration and construction inspection. Estimated Construction Cost: $10 Million " u 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT I (1) FIRM NAME a. Douglas Wood Associates, Inc. (2) FIRM LOCATION (Cily and State) Coral Gables, Florida (3) ROLE Structural Engineering (1) FIRM NAME (2) FIRM LOCATION (Ci/yand Slate) (3) ROLE b. (1) FIRM NAME c. d. (1) FIRM NAME (1) FIRM NAME e. f. (1) FIRM NAME (1) FIRM NAME g. h. I (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (2) FIRM LOCATION (City and Slate) (3) ROLE (2) FIRM LOCATION (City and Stale) (3) ROLE (2) FIRM LOCATION (City and Slate) (3) ROLE (2) FIRM LOCATION (Cily and Stale) (3) ROLE (2) FIRM LOCATION (City and Slate) (3) ROLE ~~~'JII['K:.~fjnlfS'/il.~lItilti'l!!l:~;[..iil'.a'!l!!:e:!!1. 541 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) - F. EXAMPLE PROJECTS WHicHBES'r ILLUSTRATE PROPOSED TEAM'S . QUALIFICATIONS FOR THIS CONTRACT . (Present as many projects as requesled by the agency, or 10 projects, if not specified. - > ' " - . - . Complete one Section F for each project) '"' .- ^ , . -- 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Crandon Park Restrooms Key Biscayne, Florida PROFESSIONAL SERVICES 2011 CONSTRUCTION (if applicable) 2012 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade Park & Recreation Department b, POINT OF CONTACT NAME Ms. Adelfa Martinez Park and Recreation Dept. 275 NW 2nd Street Miami, FL 33128 c. POINT OF CONTACT TELEPHONE NUMBER Tel. 305-755-7851 adelfam@miamidade.qov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Inctude scope, size, and cost) Scope/Description; Douglas Wood & Associates, Inc. provided the complete structural engineering services for the extensive renovation and structural enhancement to conform to the current Building Code for two beachfront public restroom buildings at Crandon Park (a regional county park). Estimated Construction Cost: $1.2 million 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) ! (3) ROLE a. Douglas Wood Associates Coral Gables, FL I Structural Engineering (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) I (3) ROLE e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE g. h. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE _l;[..i.i'.a'lll!'ll~ 551 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) , ..-....--. QUALIFICATIONS FOR THIS CONTRACT' ,- . (Present as many projects as requested by the agency, or 10 projects, if not specified. \ ,'. '_ ' . " . - . Complete one Section Fforeachproject) --:- -:-'~ ,,', --:-." ,- - ..':' 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (Cilyand Stale) 22. YEAR COMPLETED Giraffe Feeding Station Miami, Florida PROFESSIONAL SERVICES 2008 CONSTRUCTION (if applicable) 2008 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade Park & Recreation Department c. POINT OF CONTACT TELEPHONE NUMBER b. POINT OF CONTACT NAME Mr. Santiago Merzeau Park and Recreation Dept. 275 NW 2nd Street Miami, FL 33128 Tel. 305-755-7851 merzeau@miamidade.qov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cosl) Scope/Description; Douglas Wood Associates, Inc. provided the complete structural engineering services for this facility at Zoo Miami. The facility consists of a large wood-framed platform to accommodate a large number of people for the viewing and feeding of giraffe and other animals. The facility also includes a wood-framed approach ramp, pedestrian bridge over the moat, shade trellis and vending area. This project is completed and in use. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION leityand State) (3) ROLE a. Douglas Wood Associates Coral Gables, FL Structural Engineering (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (Cily and Slale) (3) ROLE c. d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (Cily and Slale) (3) ROLE e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (Cilyand Slale) (3) ROLE g. h. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE ~~\'jll[..~.~mr:'l'illtI:I"U'IINlmlt'il!ll:~;{..!i.,.a'l!l!'l!. 561 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) \ ~WHlC~ - QUALIFICATIONS FOR THIS CONTRACT . . - - . (Present as many projects as requested by the agency, or 10 projects, if not specified. , , , " H."" : CompleteOlleSectionFforeachproject) "".. ,~' -,. ---:.: 20, EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION ICityand State) 22. YEAR COMPLETED Greynold Park Miami, Florida PROFESSIONAL SERVICES 2001 CONSTRUCTION (if applicable) 2001 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade Park & Recreation Department b. POINT OF CONTACT NAME Mr. Ivan Rodriguez R.J. Heisenbottle Architects, P.A. 2199 Ponce de Leon Boulevard Coral Gables, FL 33134 c, POINT OF CONTACT TELEPHONE NUMBER Tel. 305-446-7799 irodriQuez@riha.net 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost) Scope/Description; Douglas Wood Associates, Inc. provided the complete structural engineering services for the historical W.P.A. park buildings including four Iimerock and wood-framed buildings (boat house, lagoon overlook and picnic shelter, restroom and park office). This was a phased effort beginning with investigations and evaluations followed by multiple projects for the repair, restoration and enhancement of the various historical and non-historical buildings in the park. Estimated Construction Cost: $4 Million 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (2) FIRM LOCATION ICity and State) (3) ROLE Coral Gables, Florida Structural Engineering I (1) FIRM NAME a. I Douglas Wood Associates, Inc. (1) FIRM NAME (2) FIRM LOCATION ICily and State) (3) ROLE b. - - (1) FIRM NAME (2) FIRM LOCATION ICityand State) (3) ROLE c. d. (1) FIRM NAME (2) FIRM LOCATION ICityand State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION ICity and State) (3) ROLE e. f. (1) FIRM NAME (2) FIRM LOCATION ICityandState) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION ICily and State) (3) ROLE g. h. (1) FIRM NAME (2) FIRM LOCATION ICityand State) (3) ROLE ~~\'lIII'Jf..~nlr:ril.I;I.."I['liNtml[.a:~;['.ij"../!'ll!!.'llll sd ) ) ) ) ) ) ) J ) ) ) ) ) ) ) ) - ~ . F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S . - QUALIFICATIONS FOR THIS CONTRACT - . , (Present as many projects as requested by the agency, or 10 projects, if not specified. ' , ,; - . _ . -', -- . Complele one Section F for each project) : . - '.'~ - ~ ..'-' .'..; 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (Cilyand Slale) 22. YEAR COMPLETED Parrot Jungle Park Entrance Pavilion Miami, Florida PROFESSIONAL SERVICES 2008 CONSTRUCTION (if applicable) 2008 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade Park & Recreation Department c. POINT OF CONTACT TELEPHONE NUMBER b. POINT OF CONTACT NAME Mr. Richard Heisenbottle R.J. Heisenbottle Architects, P.A. 2199 Ponce de Leon Boulevard Coral Gables, FL 33134 Tel. 305-446-7799 richard@riha.net 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cosl) Scope/Description; Douglas Wood & Associates, Inc. provided the complete structural engineering services for the extensive renovation, structural enhancement and historic restoration of this iconic park entrance pavilion. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (Cily and Slale) f (3) ROLE a. Douglas Wood Associates Coral Gables, FL : Structural Engineering (1) FIRM NAME (2) FIRM LOCATION (City and Slale) (3) ROLE b. (1) FIRM NAME I (2) FIRM LOCATION (Cily and Slale) (3) ROLE c. d. (1) FIRM NAME (2) FIRM LOCATION (Cily and Slale) I (3) ROLE (1) FIRM NAME (2) FiRM LOCATION (Cily and Slale) (3) ROLE e. f. (1) FIRM NAME (2) FIRM LOCATION (Cily and Slate) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and Slale) (3) ROLE g. h. (1) FIRM NAME (2) FIRM LOCATION (Cilyand Slate) (3) ROLE _iit'.aI1!l!I1!. 581 ) ) ) ) ) ) ) ) , ) } } ) ) ) ) ) RESUME -J..' ..."LU ~. ,.,... .~...."- Victor M. Avedano, PE, LEED AP, QCxP Principal/President Senior Mechanical Engineer Mr. Avedano has a wide range of experience in the design of HVAC, Plumbing and Fire Protection Systems. He is in charge of all Engineering activities in our office. He has over 37 years experience in the design and construction administration of various transportation, commercial and institutional facilities. His work experience includes the following project types: Commercial and Institutional Buildings, Transportation (airports, train stations), Educational Facilities (K-12 and Universities) and Hospitality (Hotels and Resorts). SELECTED PROJECT EXPERIENCE Miramar Regional Park, Phase II - Aquatic Center Miramar, Florida JALRW provided the HVAC, Plumbing and Electrical Engineering for the buildings in Phase II of this new 173-acre park. Phase II contained two baseball/softball fields and the Aquatic Complex with an interactive water playground and beach area. The water playground resembles Castaway Island currently located at TY Park and the pool offers swimming lanes and a dive well. These athletic fields are used to host regional baseball/softball tournaments along with adult and youth leagues. Victor was the Mechanical Engineer for this project. Robert King High Park Community Center and Soccer field Miami, Florida JALRW provided the Mechanical and Electrical Engineering and the Lighting Design for this new 6,500 square foot Community Center building including covered basketball court, new tennis court, lighting, parking, and playground & picnic area. A second phase of this project is currently in construction and consists of an illuminated soccer filed with adjoining restrooms. Victor is the Mechanical Engineer for this project. South Regional / Broward College Library Pembroke Pines, Florida JALRW provided HVAC and Electrical Engineering Design Services for this new 70,000 square foot regional library project on Broward Community College's south campus. The library is provided with daylight controls and energy efficient dimmable lighting, CO2 sensors, demand control ventilation, dedicated outside air units with pre-treated outside air and heat pipe energy recovery. It is the first LEED certified project for Broward County and has achieved a Silver rating from the U.S. Green Building Council. Mr. Avedano was a member of the Mechanical Engineering team for this project. Construction Cost: $11,000,000 Years of Experience: 37+ Education: National University of Cordoba, Argentina Bachelors of Science - Mechanical and Electrical Engineering, 1971 Registration: Professional Engineer State of Florida - #42459 Professional Associations: American Society of Plumbing Engineers, National Fire Protection Association, American Society of Heating, Refrigerating & Air Conditioning Engineers Savino & Miller Design Studio - RFQ #12-04-04 59 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) , ) ) , ) 1t"-""\'Jllr..;~IhTjnlr:'l1lltl:I-"l['IINfml[.:a:l;[..;i5'..!"'!!l!'!!~ 60 I ) ) ) ) ) ) ) ) ) ) ) ) , ) ) J ) ) RESUME Horacio A. Rodriguez, PE Principal/Vice President Senior Mechanical Engineer Mr. Rodriguez has substantial experience in Heating, Ventilating and Air Conditioning Systems for Medical Facilities, Residential, Commercial and Industrial Projects. Designs include Chiller Plants, Indoor Pool De-Humidification Systems; IAQ Inspections, Constant and Variable Volume Air Conditioning Systems; Industrial Ventilation; Life Cycle Cost Analysis; Chilled Water, DX Systems; Smoke Control. SElECTED PROJECT EXPERIENCE \ J Young Circle ArtsPark Hollywood, Florida JALRW provided HVAC, Plumbing, Fire Protection, Electrical Engineering and Lighting Design for the new Art Studios and Community Theater built on the nearly twelve-acre Young Circle ArtsPark the heart of downtown Hollywood, Florida which is a venue for art, education, recreation and entertainment. The Studios and Community Theater or "black box" theater are used for meetings, performances, banquets, and receptions. The gallery space is used for exhibiting the latest trends in the visual arts. ) In addition to the above, provisions were made for a future amphitheater with covered seating for several hundred patrons. The amphitheater will have state- of-the-art sound, light, and projection systems for programs that will include concerts, plays, dance performances, and films. Horacio was the Mechanical Engineer for this project. Construction Cost: $14,000,000 South Regional / Broward College Library Pembroke Pines, Florida JALRW provided HVAC and Electrical Engineering Design Services for this new 70,000 square foot regional library project on Broward Community College's south campus. The library is provided with daylight controls and energy efficient dimmable lighting, CO2 sensors, demand control ventilation, dedicated outside air units with pre-treated outside air and heat pipe energy recovery. It is the first LEED certified project for Broward County and has achieved a Silver rating from the U.S. Green Building Council. Mr. Rodriguez was the Mechanical Engineer of Record for this project. Construction Cost: $11,000,000 d~Y! Savino & Miller Design Studio - RFQ #12-04-04 61 "') ) ) ) ) ) . . ) ) ) ) :~-, ) ) ) ) ) ) ) I ,'r, {. . ,/_~~~~-::_,~,;,: "~"<1 '" ',. "",,"" ._"~"- l' ; ;'\ ?gf>" :!\/;::;.~'.)'~;/ "'~':;~ ~"4'i; "~'i~!~~ :,' ..',.~..,~_'.".:_,.. \~'..;.;:.'~~/ '-.!.~..~.; . ',: -/;:;: '/\:.'i)-J':,;,. ;'/ '~";.\., .:.}\::\' ,.' . ~,::';;'.}/('~ . ,.....'~f:,':.; ',' -".~-~,~'-~. , ] r" ., ,';"~ -:.' 1L].~'jIII..;.~nlr.Till~Mitli'll:l:ln'i.iJ'.8:'l!!!'l!~ 621 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) \ ) ) RESUME d~1W ''- ' .,,;_.-_1 William A. Abarca, PE, LEED AP Principal/Senior Electrical Engineer Mr. Abarca has a great deal of experience in the Design of Electrical Systems for Schools, Industrial, Commercial and Residential Projects. His designs include Power and Communication Systems, Roadway Lighting, Telecommunications, Ball Field Lighting and Amphitheatres, provided with the latest in Dimming & Lighting Systems; Interior and Exterior Lighting; Motors and Controllers; T.V., Telephone, Fire Alarm and Security Systems; Emergency Power and Uninterrupted Power Sources; Prime Power Generation, Medium & Low Voltage Distribution Systems, Project Inspection Services. SELECTED PROJECT EXPERIENCE Miramar Regional Park, Phase II - Aquatic Center Miramar, Florida JALRW provided the HVAC, Plumbing and Electrical Engineering for the buildings in Phase II of this new 173-acre park. Phase II contained two baseball/softball fields and the Aquatic Complex with an interactive water playground and beach area. The water playground resembles Castaway Island currently located at TY Park and the pool offers swimming lanes and a dive well. These athletic fields are used to host regional baseball/softball tournaments along with adult and youth leagues. William was the Electrical Engineer for this project. Robert King High Park Community Center and Soccer field Miami, Florida JALRW provided the Mechanical and Electrical Engineering and the Lighting Design for this new 6,500 square foot Community Center building including covered basketball court, new tennis court, lighting, parking, and playground & picnic area. A second phase of this project is currently in construction and consists of an illuminated soccer filed with adjoining restrooms. William is the Electrical Engineer for this project. Young Circle ArtsPark Hollywood, Florida JALRW provided HVAC, Plumbing, Fire Protection, Electrical Engineering and Lighting Design for the new Art Studios and Community Theater built on the nearly twelve-acre Young Circle ArtsPark the heart of downtown Hollywood, Florida which is a venue for art, education, recreation and entertainment. The Studios and Community Theater or "black box" theater are used for meetings, performances, banquets, and receptions. The gallery space is used for exhibiting the latest trends in the visual arts. In addition to the above, provisions were made for a future amphitheater with covered seating for several hundred patrons. The amphitheater will have state- of-the-art sound, light, and projection systems for programs that will include concerts, plays, dance performances, and films. William was the Electrical Engineer for this project. Construction Cost: $14,000,000 Savino & Miller Design Studio - RFQ #12-04-04 63 ) ) ) ) ) ) ) } ) ) ) ) ) ) ) , ) } ,'~\ ~:,' .:~~~. ,>, '~1', \;~;~'J~ .'~' >lj'.;< ,",. 1 ~: ~': ;;::L?;:c: f.~'...'; _1m1[.:a:~;[..!i".B'1!l!'1!' 641 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) , I ) Johnson, Avedano, Lopez, Rodriguez & Walewski Engineering Group provided the Mechanical and Electrical Engineering and the Lighting Design for this new 6,500 square foot Community Center building including covered basketball court, new tennis court, lighting, parking, playground & picnic area. This project is currently under construction for an estimated cost of $1.2 M. A second phase of this project consists of an illuminated soccer filed with adjoining restrooms. Phase II of this project has not been constructed. OWNER: City of Miami CONSTRUCTION COST: $3,600,000 COMPLETION DATE: 2011 ...J~~!'ll _:~ 65) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) J ) \ Kenneth DiDonato, r.E Owner, Irrigation Consultant Kenneth DiDona to has cover 35 years of experience in the design and installation of irrigation systems. He has worked on projects ranging from golf courses, parks and recreational, institutional and commercial. He has also worked with numerous public clients such as Broward County, City of Hollywood, City of Miramar, Metro-Dade, City of Boca Raton, Cooper City, Town of Davie, City of Hialeah, City of Miami Beach, and Miami Dade Public Schools. Most recently, Mr. DiDonato has worked on projects in whicll the irrigation systems were responding to cu rrent Xeriscape and LEED Ordinances, as well as utilizing the latest in computer technology from the irrigation industry. Mr. DiDonato approaches his work with tireless energy to meet the need; of his client with designs that are both efficient and practical to implement. Mr. DiDonato has been registered as a Professional Engineer in the state since 1974. S e I e c t e ,j Pro j e c t s Beach Walk City of Miami Beach, Fla The Links Golf Course Key Biscayne, Fla South Pointe Park City of Miami Beach, Fla Melreese Golf Course Miami, Fla Palmetto Ba y Park Palmetto Ba y, Fla Bayshore Golf Course Miami Beach, Fla Bayfront Pa rk Miami, Fla Normandy Shores Golf Course Miami Beach, Fla Miramar Te,wn Center Miramar, Fla Indian Greak Golf Course Miami, Fla Licenses Licensed Profess ional Engineer, Florida Education Naval Officer Ccll1didate School 1969 Master of Science Degree in Civil Engineering, University of Florida Gainesville, FL 1968 Bachelor of Sciellce Degree in Civil Engineering, Newark College of Engineering Newark, NJ 196(j 661 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) } \~t1?; ? 'lioll!1l of :of Jlflu~i-l} q 'rnf~szinnal ~ ngin~~rz !Jftllb fqaf Kenneth M. Didonato, P.E. Is LICENSED AS A PROFESSIONAL ENGINEER UNDER CHAPTER 471, FLORIDA STATUTES EXPIRATION: 2/28/2013 P.E. Lie. No: AUDIT No: 228201315971 20892 _1:I-"l[OIINlml[I:a:l;r:".fiV,a'Z!l!'z!' 671 ) ) ) ) ) ) ) ) ) ~ ) ) ) ) ) ) , ) ) ) LISA H. HAMMER April 2012 P.O. Box 330203 Miami, FL 33233 (305) 858-4667 (305) 858-4237 Fax lisahhammer@bellsouth.net CURRICULUM VITAE SUMMARY A native Miamian with over twenty-nine years of professional experience in South Florida horticulture. Particular expertise in arboriculture, landscape maintenance, integrated pest management, and plant nutrition. Advise propet1y owners, managers, and landscape industry professionals in efficient landscape management. Provide on-site consultations, prepare technical rep011s and specifications, develop and deliver training programs, and provide expert testimony in legal cases. WORK HISTORY 1987-present Lisa H. Hammer, Horticultural Consultant Private consulting practice in landscaping and arboriculture, advising property owners, managers, and landscape professionals on landscape management. Specialties include plant diagnosis and prescription, tree pruning specifications, landscape maintenance specifications, landscape monitoring programs, tree preservation programs, landscape training programs, tree and landscape appraisals, hazard tree evaluation, landscape design review, legal cases involving trees and landscaping. 1983-1987 Extension Agent, Urban Horticulture, Florida Cooperative Extension Service Developed educational programs in urban horticulture in Dade County. Targeted audiences were grounds maintenance professionals, retailers, and homeowners. Provided workshops, seminars, and on-site evaluations. Coordinated and managed Master Gardener volunteer program. Developed community gardening programs in inner city neighborhoods. 1982-1983 LaboratolJI Technician, Shands Teaching Hospita/, University of Florida Performed laboratory duties related to medical research project on effects of pectin on serum cholesterol levels. Funded by Florida Citrus Commission. Performed gel electrophoresis, spectrophotometry, and basic laboratory duties. 1981-1982 Horticulturist/Keeper A ide, City and County of Honolulu Zoo Installed and maintained plants in aviary. Worked inside cages with various bird species, installing, pruning, and fertilizing plants for aesthetics, perching, and shelter for birds. 1979-1981 Research Assistant, Department of Fruit Crops, University of Florida Part-time student assistant to agricultural researcher in studies involving the effects of ultraviolet radiation on food crops, maximization of resin content in pines, development of abscission compounds for citrus, and effects of plant growth regulators on peach bloom. Duties included basic laboratory functions including the usage of a spectrophotometer and gas chromatograph. Also maintained experimental plants in the greenhouse and growth chambers. Performed micro-grafting and budding procedures. ~fml['J:I=l;[..iit'..a'lil!'li~ II 681 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) I ) LISA H. HAMMER CURRICULUM VITAE PAGE20F4 EDUCATION 1977-/981 Bache/or o./Science, Agricu/ture, University 0./ Florida Major in Fruit Crops. Certificate of Specialization in Tropical Agriculture. Awarded William F. Ward Achievement Award, 1981. 1984-1987 Master of Science, Biologv. F/orida International University Thesis research in pollination ecology. Awarded Florida International University Travel Fellowship, June 1985, to pal1icipate in "Tropical Agroecology" course, Costa Rica. Organization for Tropical Studies, July-August 1985. Awarded Organization of American States fellowship, August 1986, to perform master's thesis research in Costa Rica. PROFESSIONAL AFFILIATIONS American Society of Consulting Arborists. Registered Consulting Arborist No. 333. International Society of Arboriculture. Certified Arborist No. SO-0758. Board of Directors, Florida Chapter, 2000-2002. Florida Arborist Association. President 1995. Florida State Horticultural Society. Vice-President 1984. LICENSES AND CERTIFICATIONS State of Florida, Certified Pest Control Operator. Cel1ification #JF89007. American Society of Consulting Arborists. Registered Consulting Arborist #333. International Society of Arboriculture. Ce11ified Arborist #SO-0758. PUBLICATIONS "Palm Shaving", Florida Arborist, Volume 5, Number 4. Winter 2002. Florida Chapter International Society of Arboriculture. "The Date Palm in the Florida Landscape". Florida Arborist, Volume4, Number 4. Winter 200 I. Florida Chapter International Society of Arboriculture. Case Capsule # I, "Arboricultural Consultant", Vol. 28, No.6, Dec. 1995. Pollination Ecology and Floral Biology of the Yellow Passionfruit, Passiflora edulis f. flavicarpa. Proc. InterAm. Soc. Trop. Hort., 30:35-44. 1986. The Pollinators of the Yellow Passionfl'uit - Do They Limit the Success of PassiJ70ra edulis f. flavicarpa as a Tropical Crop? Proc. Fla. State H0I1. Soc., 100:283-287. 1987. ~~\'jll[..~.~nlr:lill~rmltil!ll:'~;[..ii.,.a'lll!'ll. 69 i I 1 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) -\ , \ , LISA H. HAMMER CURRICULUM VITAE PAGE30F4 PRESENTATIONS Trees Florida 2006, International Society of Arboriculture, Florida Chapter and the Florida Urban Forestry Council. June 2006. "The Grovenor House: A Successful Tree Preservation Project". Complete Tree Management Program, Florida Chapter Intemational Society of Arboriculture, University of Florida Extension, and Miami-Dade Community College. October 2002. "ANSI Pruning Standards". International Society of Arboriculture, Florida Chapter, Annual Conference, 1999. "Site Considerations in Tree Species Selection." American Society of Consulting Arborists Annual Conference, 1996. "Case Capsule, Results of Internal Revenue Service Audit of Casualty Loss Claim after Hurricane Andrew". American Society of Consulting Arborists Annual Conference, 1992. "Effects of Hurricane Andrew on South Florida's Trees". Florida State Horticultural Society Annual Conference, 1987. "The Pollinators ofthe Yellow Passionfi.uit - Do They Limit the Success of Passiflora edlllis f. flavicarpa as a Tropical Crop?" InterAmerican Society of Tropical Horticulture Annual Conference, 1986. "Pollination Ecology and Floral Biology of the Yellow Passionfruit, Passiflora edlllis f. flavircarpa". COMMITIEE MEMBERSHIP City of Miami, Tree Protection Code Revision Committee. 2009-20 I O. American Society of Consulting Arborists, Document Review Committee. 1995 to 1997. Dade/IF AS Cooperative Extension, Urban Horticulture Advisory Committee. 1990 to 200 I. Metro-Dade County Tree and Forest Resources Advisory Conunittee. 1991 to 1994. TEACHING ASSIGNMENTS Florida Chapter, International Society of Arboriculture, Certified Arborist Training. June 1998. Taught Tree Selection, Planting and Establishment section of Certified Arborist training program. Florida Arborist Association, Southern Chapter. Tree Pruning Seminar, June 1995. Taught Tree Biology section. Miami-Dade Community College. 1991-1992. Part-time instructor. Taught Horticulture II, a required course for Landscape Technology majors. Dade County Extension Agent. 1983-1987. Planned, coordinated and taught numerous workshops, seminars and training programs on a variety of topics related to urban horticulture. Coordinated, managed and taught Master Gardener volunteer program. Lisa H. Hammer, Horticultural Consultant. 1987 to present. Numerous private training sessions for professional landscape maintenance and pest control company personnel, and municipality employees. _;:."!i'..!:'J:i!!'!'~ 70 I ) ) ) ) ) ) ) J ) ) ) ) ) ) ) ) ) ) ) J LISA H. HAMMER CURRICULUM VITAE PAGE40F4 RELEVANT PROJECTS City of Coral Gables, Landscape Architecture Consulting Contract. Coral Gables, Florida. 2012 to 2014. On team with Curtis & Rogers Design Studio to provide arboricultural and horticultural consulting as needed. Coconut Grove Business Improvement District, City of Miami, Florida. 20 I 0 to present. On team with Curtis & Rogers Design Studio for sidewalk enhancement project, Phase I and Phase II. Evaluation of all existing trees, evaluation of potential tree space improvements, and development of long-range tree management program in the central business district of Coconut Grove. Scott Carver Redevelopment Project. Miami-Dade County Housing Authority. 2009-2010. On team with Bell & Aqui Landscape Architects. Evaluation of existing trees, preparation of documentation required for permitting, oversight of tree relocations. Museum Park, City of Miami, Florida. 2009. On team with Savino & Miller Design Studio. Prepared Landscape Maintenance Manual for new landscape design plans. Ba)1ront Park, City of Miami, Florida. 2007. On team with Curtis & Rogers Design Studio. Evaluated existing trees and prepared a long-term tree succession plan. Miami-Dade Community College, North Campus and Kendall Campus. 2006-2007. Evaluation of existing trees, hazard tree evaluations, preparation of tree pruning specifications, and long-term tree management program. Village of Key Biscayne. F/orida Landscape Master Plan. 2006. Evaluated all existing landscape conditions, made recommendations for long-term landscape management, and prepared landscape maintenance speci fications. University of Miami Giflord Arboretum. Coral Gables, Florida. 2006. Evaluated hurricane damage to rare tree collection and developed evaluation criteria to determine how best to prevent hurricane damage in the future. Spring Garden Historic District Greenway Project. City of Miami, Florida. 2006. On team with Reynolds Smith & Hills and Curtis & Rogers Design Studio. Evaluated existing trees and proposed greenway development plans. Selected replacement trees in nurseries. South Miami Avenue Re-SlIIfacing Project. City of Miami and Miami-Dade County, Florida. 2006. On team with Reynolds Smith & Hills and Curtis & Rogers Design Studio. Evaluation of historic trees and recommendations for long-term management. Broward County Ai/port, Landscape Master Plan. Hollywood, Florida. 2004. On team with Wallace Roberts & Todd. Evaluated all existing landscape conditions, made recommendations for long-term management, and prepared landscape maintenance specifications. _:l:l....iit'.a.li!!..li. 71] ) ) ) ---~- ) ) ) ) ) ) ) ) ) ) ) ) , ) ) ) ) \ } 721 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ~ . , STATE OF FLORIDA ~tp.lrtmtnt of ggrlcultllrt llnb (onlfUmtr ~trbjctlf BUREAU OF ENTO)IOI.OGY .or. rEST COl\'TROL Dale Aagun 10, ZOIO File NO. JF8~007 Expires June 1,2011 THE CERTIFJED,~E.S'r CONJR<?i;oPERATORNAM.ED BELOW lIAS REGISTERED ~DE,1t TIJ~ I~~OVISIONS OF CHA/lTER 482 fOR THE PERIOD EXPIRINO:june I, 20n, ',' ~-,.:' ~l'p::,.: .;: < '. tJ'l LISA HARDEN J1AMMER~~' 2S211NAGUA AVE MIAMI, fL 33133 ) < L,'lWIl and Ornamrnt:d " C/U. #~ OIARLES H BRONSON, alMMISSIONER _1['JCI:l;("i.iI'.!"l!l!l!l~ ~ 1 STATE OF FLORIDA :lDtP4rtmtnt of ~grltullun snb ~lUlumcr ~ttblcrg BlJREAU OF ENTOMOLoGy 4< PEST CONTROl. :1 . .. USA H,\RDEN IIAMME,!t .i CERTIFIED PEST CPl'tTROL OPERATOR JF89007 lIAS PAID TIlE fEE REQUIRED BY CIMJ'TER ~82 rOR TIle PERIOD EXPIRING lu.~ I, 2011 ' "t"., , Signalure a,i #../--., C~U.IlSSI0l'-EJI, Wall.. Covd . fold flcte BUREAU Of ENTOMOLOGY &. PEST CONTROl. 1201 GOVERNOIl'S SQUARE BLVD. STE 300 TAllAHA.~SEF" nOR IDA 32301 73j ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) J ) ) , , APPROACH/METHODOLOGY SAVINO & MILLER DESIGN STUDIO has been significantly involved in many public and private sector preservation projects in the South Florida area. Many of these include open space improvements in both park and community center settings. The creative, sensitive design of these human scaled spaces, within a sustainable framework, forms the essence of our firm's design philosophy. We practice Landscape Architecture to create beautiful and meaningful places, which provide a space for social interaction and communication, and enhance their sense of being, relationship to nature, and their fellow citizens. In so doing, these places can become a source of pride to our neighborhoods and communi- ties, while improving our quality of life. Design Approach Savino & Miller Design Studio is committed to a collaborative approach to planning and design. We under- stand and believe in the importance of teamwork and effective communication in delivering a successful project. Our background and experience in landscape architecture, urban design, architecture and planning give us a unique insight into the various elements and forces which shape our built environment. Our method begins with: 1. A thorough understanding of community/City goals as articulated in the design program. Discussion with the client in regard to how the space is to be used - or "programmed" - is essential in determining our design responses, such as the ratio between paved and green space, building/ shade structures vs. open space, utility/mechanical requirements, park hours, and so on. 2. An analysis of site factors such as proposed user analysis (Le. adults, elderly, children, pets), local climate, physical factors including soils, surrounding land use, and socio-cultural context and historical overlay. 3. Analysis of anticipated park management models and maintenance resources. The well-designed and programmed Urban Park provides the fundamental community function of bringing people together, helping to create a sense of "community". It provides a forum for knowing your fellow citizens, and a welcome mat for visitors. It fosters communication, forges community bonds, and promotes social interaction, all essential elements in building a democratic society. It forms the heart of any Com- munity; the City of Sunny Isles Beach is now engaged in an exciting process of converting tired, old, com- mercial strip centers into viable green space, which so happens to be rising trend in current urban design strategies. Some of the important issues to be addressed during the pre-design and design process include traffic noise, improvement of the land-water interface, pedestrian connectivity and safety, the creation of shade canopy, and user program. Sustainability We believe that the Parks' Master Plan must be responsive to, and instructive of, present and future issues of ecological sustainability. Our design will incorporate a systems approach in integrating the Park's infra- structural needs with long-term goals, such as reducing the parks' power demand/carbon footprint, water conservation, stormwater runoff mitigation and waste recycling. ~lmlriJ!l:'~;[..fj.,.a'1!l!'1!. 751 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) Naturally, as Landscape Architects, we are especially interested in creating a Park which reflects the incred- ibly rich biodiversity found in South Florida, but also creates a sense of place, giving the user a keen aware- ness of Sunny Isles Beach/South Florida ecology. Our firm has been engaged in sustainable, "green", landscape architectural practices for almost 20 years. We incorporate state-of-the-art technology for site lighting, stormwater management planting techniques, and irrigation. We have completed, or are presently working on, various LEED certified projects, including the Surfside Community Center, and the nearby Aventura Optima Office building. More importantly, our practice routinely incorporates sustainable practices and products into its design. Paving surfaces for pedestrians can be constructed with pervious pavers, taking advantage of new SFWMD policies which credit innovative stormwater management techniques which reduce site run-off. The material use in paving is an important component of the park's sustainable design concept. Where possible site's walkways surfaces will be a crushed granular/stabilized surface, which will reduce the energy/carbon foot- print in the park's construction and operation. Finally, our designated project designer Courtney Jennings, has LEED AP accreditation. Site Design The 16000 Collins and 16200 Park Sites are located in the Center of the City of Sunny Isles Beach. The function of this space has a dual nature: it will act as the Gateway into the residential communities to the adjacent islands and also as two linear passive parks. These parks will be accessed by pedestrians and they will be visible from Collins but also from the surround- ing high rise residential buildings. Proximity to the water is one of the key advantages since these sites provide one of the few public waterfront access points in the City. Our design concept for the park stems from the RFQ's expressed intent of building a sustainable, Park that will work function as a Passive Park. Simple materials and ease of maintenance, as well as safety and security, will be paramount in guiding our design decisions. If the park program includes night use, site lighting will be utilized throughout the park, with energy-use and economy driving the selection of light fixture/lamp types, and quantities. Recent advances on Solar and LED technology have made it possible to utilize LED in a variety of ways, from street lighting to walkway "markers. Planting Design The Planting Design will reflect the latest innovations to create a sustainable South Florida landscape. Our design starts with creativity and vision in the site planning process, which establishes the contextual layout for the park and relationships to the surrounding properties, waterway and Collins Avenue. Planting im- provements will be designed with an emphasis on creating a sense of being on a sub-tropical barrier island in South Florida, along with the project's goal of providing an expanse of lawn for recreational opportunities. To encourage year round activity, palms and trees will be sited to provide both shade and sun. Large, native canopy trees and Palms will form the backbone of the design if shade is desired, through which the various program elements and walkways weave. _1~1m1['-.:II=~;[".!jl',at!l!l!!' 761 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) In regard to planting types, we are well versed in native vegetation, and usually prefer a planting regime which reflects the site's genus loci and our sub-tropical environment. Native groundcover and shrubs will be specified which minimize maintenance, water-consumption (xeriscape), pesticide and fertilization use. In order to further minimize maintenance, large-leafed plants and grasses can be selected to help reduce pruning requirements. In fact, in some areas of the park, the plants will be designed to require temporary irrigation only for estab- lishment, and during droughts if necessary. However, the final planting palette will be formulated in discussions with the City's Parks Department, in keeping with their maintenance requirements and goals. Irrigation design will be specified for the singular purpose of conserving water. It will incorporate the latest technology in climate and water-sensing technology, such as "Smart Controllers", which program water needs according to a region's climate. Plants and irrigation will be zoned according to seasonal/water re- quirements, allowing maximum flexibility in water consumption. For example, the sod areas - may be speci- fied with plants which are zoned for higher water consumption rates, while other more natural park areas may be zoned to turn off the water completely for most of the year. We are well versed in the design and implementation of "Xeriscape" landscapes. Other methods are also available to effectively conserve water and other resources, i.e. the use of slow-emitting/low-trajectory heads, alternative use of ground-plane ma- terials such as gravels and native drought-tolerant plants, and mulching. In addition to the traditional scope of landscape architectural services, such as planting, irrigation and pav- ing design, Savino & Miller Design Studio also provides consultation for Site Lighting Design and Signage Design, if requested. Maintenance Maintenance of any park is one of the most important considerations while in the design process. The de- sign must call for improvements which can be maintained effectively by staff and within budget. It is key to the project's success, as any beautiful design will be unappreciated and un-used if not well maintained. We provide a careful consideration of product life cycle, energy cost, and ease of maintenance for all as- pects of the Park's design and material selection. Site Furnishings and Signage In the spirit of sustainability, we envision using materials and furnishings which are locally available or manufactured. All materials will be prioritized according to their cradle-to-cradle value, in terms of pre- and post-recycling content and potential. Simplicity, ease of maintenance, and parts/element replacement will all be key factors in the design and selection of materials and park components. _i.i".l!:'!!!!'!!~ 771 ) ) ) ) ) ) ) ) ) ) ) ) ) } ) ) ) ) ) ) ) Project Methodology SMDS is very familiar with the project design process as described in the Intracoastal Parks RFQ, which is very similar to some of our projects and it is generally as follows: 1.Pre-Design Services and Field Verification 2.visioning Process 3.Public review 4.Preparation of a Final Design Concept and approval 5.Document Preparation 6.Permitting 7.lmplementation (Construction Phase Services) The following is an outline description of the Scope of Work to be provided by the Savino and Miller Design Studio Project pursuant to the City of Sunny Isles Beach Request for Qualifications. I. PRE- DESIGN SERVICES: A. Project Kick-Off Meeting B. Prepare a certified topographic survey for each site, including all site elements that will affect the design in Auto-cad Format C. Provide geotechnical reports to understand subsoil characteristics such as percolation and drainage capacity, soil bearing capacity, etc. D. Meet with sub consultants and do a site inventory analysis to understand existing conditions, opportunities and constraints. E. Meet with City Staff, Commission, or any committee as required to understand goals and objectives. Further define program, potential users, etc. F. Develop Design Concept(s) with Site illustrations such as Site Plans, perspective sketches as necessary to explain the ideas. 1.Preliminary Budgets G. Visioning Sessions with Staff, Mayor and Commission Members H.lf required, Workshop to present the ideas to the community 1.0ne Public (one meeting) I. Final Design Submission with opinion of probable cost. 1.Presentation Meeting to Commission if required II. DESIGN SERVICES: J. Once conceptual Design is approved by the City Manager we will start the preparation of the permittable Construction Documents. K. The team will provide documents at 30% completion, 60% completion, 90% completion and 100% completion in order to coordinate the effort between sub-consultants and with all agencies having jurisdiction over the Parks. These Agencies may include: City of Sunny Isles Beach, Miami Dade County, DERM, US Coast Guard, The Army Corps of Engineers and PERA. L. Provide the necessary services for obtaining final permit sets. M. Provide Copies (electronic and hardcopies) as required by the City's representative. N. Present to Commission: Conceptual, Progress and final Design. 78 ~ ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) j ) ) j , III. CONSTRUCTION SERVICES: O. Assistance to City of Sunny Isles Beach in Bid-Award of Construction Contract 1. Attendance at Pre-Bid Conference 2. Prepare Addenda as necessary 3. Attend Bid Opening 4. Assist in Bid Evaluation and Recommendation of Award 5. As-Bid Documents P. Construction Phase Services in accordance to City requirements Q. Process Contractor's Requests for Information RFI's and Submittals R. Process Contractor's Change Order requests and Pay Applications Ability to meet desired timelines and deadlines: We pride ourselves for our record of meeting tight deadlines without sacrificing project quality. . This is only possible with experience and by working with qualified professionals in our team, especially when having previous project experience together. Our firm has developed standardized procedures and methodologies for quality control and efficiency in document delivery. We are continually updating our details and speci- fications to reflect current thinking and technologies in regard to tree and palm planting, paver, lighting and irrigation. Communication is another important aspect of our practice. We meet once a week with all the project managers and designers in order to go over each one of the projects and we meet regularly with our sub- consultants in order to coordinate drawings and specifications and to clarify and delineate tasks. These progress meetings with consultants and with clients, as work progresses, ensure that tasks are achieved as expected. We have standardized many of our construction phase procedures as well, including routine site visits and punch lists as well, and remain committed throughout the design and construction process to ensure our clients they get what they paid for, and the design's intent is preserved. In order to produce quality documents our office uses Auto Cad drafting and other graphic programs that ensures accuracy and quality. _1[.:a:~;ln!iP.a.!!!.!. 79 ~ 9293 HARDING AVENUE SURFSIDE, FLORIDA 33154 (305) 861-4863. FAX: (305) 861-1302 WWW.TOWNOFSURFSIDEFL.GOV April 28, 2012 To Whom It May Concern: On behalf of the Surfside Parks and Recreation Department, I am pleased to recommend Savino & Miller Design Studio for the Sunny Isles Beach Parks Design Project. SMDS has worked with diligence and the highest standard of professionalism over the past five years in producing a Master Plan, design/ construction documents, and construction phase services for our recently opened Surfside Community Center, on Collins Avenue and 90th Street. SMDS used a creative and comprehensive planning approach in providing the City with alternative active/passive park designs for our community center's complete renovation. They worked diligently with the City Commission, our staff and through numerous community meetings throughout the process to build consensus, and used these inputs to develop a progressive, beautiful and creative design. The project was designed for silver LEED certification. The final design ingeniously incorporated the beach dune area - which was formerly separated from the pool deck - directly to the new pool deck area, along with integrating a multi-functional pool area in a relatively tight space, serving the needs of children, recreational swimmers and swimming classes. The project has been a huge success for residents and visitors alike, and we are extremely satisfied with the results. It is a beautiful design as well. Their ability to reconcile difficult site issues with creative design solutions, and responsiveness in working with the City's various interest groups and City staff have been crucial factors in the project's success. I believe this firm's experience and comprehensive approach to park design within an urban setting wil! be ideal for the Sunny Isles Beach Park Project. Respectfully submitted, ~ 7~1~ Tim Milian Parks and Recreation Director Town of Surfside ) ) ) ) ) ) ) ) (([iill of 4fl[ianti JOHNNY MARTINEZ, P.E. City Manager April 25, 2012 , , City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, F1.33160 Att. Marcanthony Tulloch, Purchasing Agent RE: Design & Permitting Services of the Intracoastal Parks Request for Qualifications No. 12-04-04 Dear Mr. Tulloch: I have worked with Savino Miller Design Studio as Project Manager for the Brickell Avenue Median Streetscape project in the early 1990's and have been working with them over the past several years on the City of Miami Museum Park project. On projects of varying scales and project scope, SMDS provides a creative design approach which incorporates abundant experience in working within the pragmatic requirements of public sector work. Furthermore, Savino & Miller is incorporating a range of sustainable initiatives, such as reduction of asphalt paving surfaces, alternative parking treatments, use of local paving materials, site furniture, native plants, irrigation technologies, and LED lighting, into the Museum Park design. Our experience with Savino & Miller has been very positive. They have demonstrated a high level of professionalism in their approach and work hard to see their projects are built according to the original design intent, providing important value engineering skills to the process. Barry Miller, Principal of SMDS, has been involved in all phases of the work and collaborates well within a design team environment. In conclusion, Savino Miller Design Studio would make an excellent choice as Landscape Architect for the Sunny Isles Beach Intracoastal Park project. Please feel free to call me at (305) 416-1419 if you have any questions. Sincerely, ;; . 'k\~(!. Enrique . urie;, ~ 0 Chief of rban Design City of Miami Planning and Zoning Department PLANNING DEPARTMENT 444 S.W. 2nd Avenue, 3rd Floor / Miami, Florida 33130/ (305) 416-1400/ Fax: (305) 416-2156 Mailing Address: P.O. Box 330708 Miami, Florida 33233-070 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) , j ) \ ~...l..! NDRTH~MiAMI . . .. .. . F LOR IDA . . April 28, 2012 . . . City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FI.33160 Att. Marcanthony Tulloch, Purchasing Agent RE: Design & Permitting Services of the Intracoastal Parks Request for Qualifications No.12-04-04 Dear Mark: The City of North Miami has recently worked with Savino Miller on the N.E. 12Sth Streetscape Project, and the Pioneer Boulevard Entry & Streetscape project both in North Miami, Florida. For the 12Sth Streetscape Project, Savino & Miller's work involved developing streetscape design concepts for our city's central business district. Savino Miller led the master planning effort, especially relating to the relationship between the existing architectural aesthetic, building-to-public right-of way relationships, and site issues. The first phase, built with ARRA funding was a million dollar sidewalk design which key elements included the paving pattern, which focused on historic design elements. The Master Plan included as well a sustainable streetscape planting, and streetscape re- configuration that included tree palms and planted bulb outs, and pervious paving parking spaces. Pioneer Boulevard is the main street of a residential neighborhood in North Miami. Savino & Miller designed the improvements and restoration to the historic fountain on NE 6th Avenue, as well as the streetscape's paving and planting improvements from NE 6th Avenue to West Dixie Highway. Flowering trees approved by the city have recently been installed. The project fountain improvements are going to bid and we anticipate completion this year. Savino Miller provided landscape architectural services which included master planning, design documents and construction administration. Working directly with several city departments as well as the installation contractors, Savino & Miller insured that all aspects of the design were completed with great attention to detail. In summary, Savino Miller Design Studio performed in an exemplary manner of workmanship and professionalism, helping us to create an integrated downtown design aesthetic, and new streetscape for two of our important city corridors. I am pleased to recommend Savino Miller based on my experience in working with them. Alee A. , P.E. Public Works Director City of North Miami Public Works DBpartmBnt 776 NE 125 StrBBt I North Miami I Florida I 33161 305-885-8830 Fax: 305-885-4658 ) ) } ) ) ) ) ) ) ) ) ) ) ) ............................ <}....,....... ................ J~ MILTON & ASSOCIATES ..............."......,....<}............................ April 13, 2012 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Attn. City Clerk Re: Barry Miller, ASLA Savino Miller Design Studio I am pleased to recommend Savino Miller Design Studio for the RFQ #12-04-02 and RFQ #12-04-04. Our company has been doing business with Mr. Barry Miller as Vice President of Savino Miller Design Studio for the past year and we are extremely satisfied with their professionalism and experience in urban design, site and community planning, commercial and park design. Please feel free to contact me at (305) 460-6300 if you need additional information. ~ Joseph Milton President 3211 Ponce De Leon Blvd., Suite 30 I, Coral Gables, Florida 33134 Telephone 305 /460-6300 '> Fax 305/446-0795 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) \ , PRIME CONSULTANT Savino & Miller Design Studio 12345 NE 6th Avenue - Suite A North Miami, Florida 33161 305-895-9082 ext. 301 Contact: Adriana Savino-Miller SUB CONSULTANTS Douglas Wood Associates Inc. 2100 Ponce de Leon Boulevard, Suite 1020 Coral Gables, Florida 33134 305-461-3450 ext. 311 Contact: Kenneth Boyer JALRW Engineering Group, Inc. 2510 NW 97th Avenue, Suite 220 Miami, Florida 33172 305-594-0660 ext.223 Contact: Alex Lopez Langan Engineering & Environmental Services Inc. 15150 NW 79 CT Miami Lakes, Florida 33016 786-264-7200 Contact: Leonardo Rodriguez, P.E. Ken DiDonato, Inc. 2210 Hollywood Blvd. Hollywood, Florida 33020 954-923-2555 Contact: Ken DiDonato Lisa H. Hammer 2850 Coconut Avenue #2 Miami, Florida 33133 305-476-5748 Contact: Lisa Hammer - 861 ) ) ) ) ) ) ) - ) ) ) ) ) ~ , \ } , DELIVER TO: City of Sunny Isles Beach City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 REQUEST FOR QUALIFICA TIONS SECTION 6 BID SUBMITTAL FORMS OPENING: 10:00 A.M. 05/01/2012 CITY OF SUNNY ISLES BEACH, FLORIDA Issued by: Purchasing Agent Date Issued: 04/02/2012 This Bid Submittal Consists of Pages 22 through 2S Sealed bids are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. RFQ 12-04-04 DESIGN AND PERMITTING SERVICES OF THE INTRACOASTAL PARKS A Bid Deposit in the amount of 0% of the total amount of the bid shall accompany all bids A Performance Bond in the amount of 0% of the total amount of the bid will be required upon execution of the contract by the successful bidder and City of Sunny Isles Beach Procurement Aaent: Marcanthony Tulloch Firm Name: Savino & Miller Design Studio Commodity Coders}: RETURN ONE ORIGINAL AND FOUR COPIES OF BID SUBMITTAL PAGES AND AFFIDA VITS FAILURE TO SIGN PAGE 2S OF SECTION 4 BID SUBMITTAL WILL RENDER YOUR BID NON- RESPONSIVE City of Sunny Isles Beach I Request for Qualifications No. 12-04-04 8.!L1 ) ) ) ) ) ) ) ) ) ) ) ) \ I ) ) PART I: ) SECTION 6 BID SUBMITTAL FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID Addendum #1, Dated Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: IXl NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID FIRM NAME: Savino & Miller Design Studio AUTHORIZED SIGNATURE, ~ATE' 04-30-2012 TITLE OF OFFICER: President City of Sunny Isles Beach I Request for Qualifications No. 12-04-04 89 , ") ) ) ) ) ) ) ~) ) ) ) ) ) ) ) ) J BID SUBMITTAL FORM Bid Title: DESIGN AND PERMITTING SERVICES OF THE INTRACOASTAL PARKS The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of Sunny Isles Beach to perform and furnish all Work as specified or indicated in the Documents within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. The Proposers accepts all of the terms and conditions of the Advertisement or Request for Qualifications and Instructions to Proposers, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within ten days after the date of the City's Notice of Award. In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that: The Proposer has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposers to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and/or Notice to Proceed. City of Sunny Isles Beach I Request for Qualifications No. 12-04-04 _;[..!i~J!'!!!:'l!. got ) ) ) ) ) ) ) - ) ) ) ) ) ) ) ) ) Firm Name: Savino & Miller Design Studio Street Add ress: 12345 NE 6th Avenue Suite A - North Miami, FL 33161 Mailing Address (if different): Telephone No. 305-895-9082 Email Address:adriana@savinomiller.com Fax No. 305-895-9083 FEIN No. illfL-SJJ4.J.1J2JfLlill1- * "By signing this document the bidder agrees to all Terms S;gnatu"" ~.. (Signature of authorized agent) Print Name: Adriana Savino-Miller Title: President THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. City of Sunny Isles Beach I Request for Qualifications No. 12-04-04 - 911 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) NON-COLLUSION AFFIDAVIT City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax; (305) 949-3113 STATE OF FLORIDA ) COUNTY OF f{1&VH::mJ/i The undersigned being first duly sworn as provided by law, deposes, and says: This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beaeh City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respeet to this Bid. The undersigned is authorized to make this Affidavit on behalf of, Savino & Miller Design Studio, P.A. (Name of Corporation, Partnership, Individual, etc.) a, corporation (Type of Business) . formed under the laws of Florida (State) of which he is President (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solieited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. Thi~ Bid is genuine and not collusive or a sham; the person, firm or eorporation n~ed above in Paragraph 10.2 has not eolluded, conspired, connived or agreed directly or indireetly with any proposers or person, firm or eorporation, to put in a sham Bid, or that sueh person, firm or corporation, shall refrain from Bidding, and has not in any manner, directly or indireetly, sought by agreement or eollusion, or eommunication or conference with any person, firm or eorporation, to fix the priees of said Bid or Bids of any other proposers; and all statements eontained in the Bid or Bids deseribed above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 10.2, has directly or indireetly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any assoeiation or to~ Adriana Savino-Miller AFFIANT'S NAME President AFFIANT'S TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this 9th day of April ,2012 Personally Known or Produeed Identification ".- Type of identification p<- pv >t 4-100 - 007- ~"'-!;<fc;, . /? U:U.Ma'~ ?) /,/- -. NOTARY PUBLIC (name print (j Ortyped)-/ ) / / /' ..,. (Affix seal here) "\\lU/',, ,:o'~\~"v Pt4::.", CRISTlANA GRULLON g "': *." ~ Notary Public - State 01 Florida ~ ~ *. : ;~ My Comm. Expires Aug 26, 2015 -;.,~}: ~-$>l .. EE 100586 ".,f" OF fCo", CommiSSion # "'11111"\ DECEMBER 28, 2010 1 of 7 ) J ) ) ) ) ) ) ) ) ) ) , ) \ , J PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax; (305) 949-3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. for Savino & Miller Design Studio, P.A. [pnnt name Of enoty submitting swom statement] whose business address is: . 12345 NE 6th Avenue - Suite A North Miami, FL 33161 and (if applicable) its Federal Employer Identification number (FEIN) is 65-0412661 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: .) 11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere. 11.4. I understand that an "affiliate" as defined in Para. 287.133(1 )(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair 2 of? DECEMBER 28, 2010 ) ) ) ) ) ) ) ) ) , ) ) , ) ) , market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 11.5. I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) X Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989: The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (AttaFh a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STA!UTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE IN,FORMATION CONTAINED IN THIS FORM. By: ~r---J (Signature) Adriana Savino-Miller (Printed Name) President (Title) ~: ~Sworn!Q and subscribed before m~ J~" 9th .~~ o~//I?o- /)?/tL4 (AFFIX NOTARY STAMP HERE) dayo! ~~ ?;n Signature: Notary P(:;bIiC - State of Florida CA, !,~ ,.t:J,f) ~. ,,(tun M Y) Print or Type Commissioned Name Personally \\,'"11'" ,,,,,\...~y Put/", ~"o '(...~ :"'.. *."~ Notary Public. State 01 Florida ~~ *. : ;: My Comm. Expires Aug 26, 2015 "":::;Fon,o..~~l Commission # EE 100586 ""JlIl" 'fication CRISTlANA GRULLON V" Type of Identification Produced Ftot... {...( -4 (,,0 -007- blo-rtf b-O 10/1998 3 of 7 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) J ) ) I f EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone; (305) 947-0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY I AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: ~ ) Title: President Firm: Savino & Miller Design Studio Address: 12345 NE 6th Avenue North Miami, FL 33181 :iP.aI!!!'!~ 95 J ) ) ) ) ) ) ) ) ) ) ) ) ) CONFLICT OF INTEREST City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach. FL 33160 Telephone; (305) 947-0606 Fax; (305) 949-3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. . STATE OF FLORIQA COUNTY OF 1-1 {Afv{ (0J.q)e BEFORE ME, the undersigned authority, personally appeared Adriana Savino-Miller deposes, and states: , who was duly sworn, President with a local office in 12345 NE 6th Avenue - Suite A of and principal office in 18.1. I am the Savino & Miller Design Studio, P.A. North Miami, FL. 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No. 12-04-04 described as: Landscape Maintenance Services. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 18.5 Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor anyone associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 18.71 certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. ' 18.8 I certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.9 In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach. DaJ,e~t~iL _9J.8. _ ~ day of April ,2012 ~~ .6<C>tU.AA11t- ~J.U}-M.t.U-,-"..J AFFIANT Print or Type Name and Title Sworn to and subscribed before me this ...!.E....- day of Ap l?.; \ , 2012 Cl Personally Known OR (3""' Produced Identification v; Type of .I,tifi~ation NOTARY PUBLIC STATE OF FLORIDA - OD7-S:.?o-r;yro-o \\,"11"'1 "b\~"Y PlJ~'" CRISTlANA GRULLON t"': .."'\ Notary Public. State of Florida -. . It .. \.s;.' · (:)'<J My Comm. Expires Aug 26. 2015 8, "o"cc;~~'" Commission # EE 100586 "11111" 50f7 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone; (305) 947-0606 Fax; (305) 949-3113 Or svtl DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No", If you answer "Yes", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO x 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO x 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES X NO If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. Savino & Miller Design Studio ~ ..~. Authorized ignature 04-30-2012 Date Adriana Savino-Miller, President Print or Type Name and Title The project design team and general contractor are presently in litigation with the City of Miami Beach regarding various issues at South Pointe Park. Savino & Miller Design Studio was part of the design team. DECEMBER 28,2010 _"Wii.,.II.lll!!.lli 6 of 7 971 ") ) ) ) ) ) I ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) I \ ) ANTI-KICKBACK City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone; (305) 947-0606 Fax; (305) 949-3113 ANTI-KICKBACK AFFIDAVIT STATE OF FLORIDA ) ) COUNTY OF ) I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. By: Title: President The foregoing instrument was acknowledged AWil , 20~ by Adriana Savino-Miller of person], as President Savino & Miller Design Studio, PA executed] . before me this 9th day of [name [type of authority], for [name of party on behalf of whom instrument was AFFIX NOTARY STAMP HERE: t/< / :51 J h' /J /-J ~ /OJ /10/} Print or Type Commissioned Name Personally Known OR Produced Identification -- Type of Identification Produced Fl.. P(.... t-.-{ 4" 0 -00'7 ~ - 4:,-q CD - 0 DECEMBER 28, 2010 7of7