Loading...
HomeMy WebLinkAboutCalvin Giordano & Assoc. Qualifications for City of Sunny Isles RRFFQQ NNoo.. 1122--0066--0011 CCOONNSSTTRRUUCCTTIIOONN MMAANNAAGGEEMMEENNTT SSEERRVVIICCEESS FFOORR GGAATTEEWWAAYY PPAARRKK Sunny Isles Beach Government Center | 18070 Collins Avenue, 4th floor | Sunny Isles Beach, FL, 33160 Date: Wednesday, June 13, 2012 – Time: 10:00 A.M. OORRIIGGIINNAALL RFQ #12‐06‐01, Construction Management Services for Gateway Park TOC  TABLE OF CONTENTS     COVER LETTER  SECTION 1 Company Information ...................................................................................................................................... 1| 1 • Name of Agency/Company ............................................................................................................. 1| 1 • Company Locations ........................................................................................................................... 1| 1 • Internet Web Site Address ............................................................................................................. 1| 1 • Business Structure ............................................................................................................................. 1| 1 • Date Founded ....................................................................................................................................... 1| 2 • Home Office Address and Telephone Number ....................................................................... 1| 2 • Litigation Statement  ........................................................................................................................ 1| 2 • Proof of Insurance.............................................................................................................................. 1| 3 • Implement Service After Authorized to Begin ....................................................................... 1| 4 SECTION 2 Qualifications ....................................................................................................................................................... 2| 1 • Licenses .................................................................................................................................................. 2| 8 • Certificate of Authorization ........................................................................................................ 2| 11 • Occupational License ..................................................................................................................... 2| 11 • Relevant Experience ...................................................................................................................... 2| 11 SECTION 3 Staffing .................................................................................................................................................................... 3| 1 • Project Manager Experience .......................................................................................................... 3| 1 • Organizational Chart ......................................................................................................................... 3| 2 • Resumes ................................................................................................................................................. 3| 2 SECTION 4 Approach/Methodology .................................................................................................................................. 4| 1 SECTION 5 References............................................................................................................................................................. 5| 1 SECTION 6 Office Locations .................................................................................................................................................. 6| 1 SECTION 7 Contract Forms ................................................................................................................................................... 7| 1 • Bid Submittal Forms  • Acknowledgment of Addenda  • Non‐Collusion Affidavit  • Public Entity Crimes  • Equal Opportunity/Affirmative Action Statement  • Conflict of Interest Statement  • Dispute Disclosure Form  • Anti‐Kickback Affidavit  RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 1| 1  COMPANY INFORMATION  Name of Agency/Company  Calvin, Giordano & Associates, Inc. (CGA) is a multi‐disciplinary firm that began as a small two person‐ surveying firm in Florida 75 years ago.  From 1937 to 2012 we have grown to over 200 employees,  expanded geographically with offices in Fort Lauderdale, West Palm Beach, Port St. Lucie, Homestead,  Clearwater, Jacksonville and Atlanta, Georgia and have strategically added an exceptionally broad range of  services to meet our clients’ needs.   Professional Services:   Civil and Electrical Engineering  Environmental Planning   Traffic Engineering  Emergency Management Services   Landscape Architecture  Building Code Services   Construction Management and Inspection  Code Enforcement   Public Administration / Management  Planning and Zoning   Survey and Mapping  Geographical Information Services   Redevelopment and Urban Design  Indoor Air Quality   Information Technologies  Human Resources Management  Company Locations  Calvin, Giordano & Associates Fort Lauderdale office located at 1800 Eller Drive, Suite 600, Fort  Lauderdale will be the responsible office.   OTHER OFFICE LOCATIONS  Treasure Coast (WPB Office)  560 Village Boulevard, Suite 340  West Palm Beach, FL 33409  Tel: (561) 684‐6161  Homestead Office   97 NE 15th Street  Homestead, FL 34590  Tel: (786) 243‐0071  Tampa Office  2349 Bluewater Way  Clearwater, FL 33759  Tel: (727) 394‐3825  Port St. Lucie Office  2400 SE Veterans Memorial  Parkway, Suite 207  Port St Lucie, FL 34952  Tel: (772) 489‐9494  Jacksonville Office  111 Riverside Avenue  Jacksonville, FL 32202  Tel: (904) 834‐4314  Metro Atlanta Office  4151 Ashford Dunwoody Rd NE  Suite 120  Atlanta, GA 30319  Tel: (678) 252‐1096  OFFICE LOCATION(S) FOR ANTICIPATED SUB­CONSULTANTS  Masuen Consulting, LLC.  5079 North Dixie Hwy, Suite 323  Oakland Park, FL 33334  Tel: (866) 928‐1533  Pistorino & Alam Consulting, Inc.  7171 SW 62nd Avenue, 4th Floor  Miami, Florida 33143  Tel: (305) 669‐2700  Internet Web Site Address  Calvin, Giordano & Associates website address is: www.calvin‐giordano.com.   Business Structure  Business Legal Status Corporation  State/Date Incorporated Florida / June 27, 1985  1 Section  RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 1| 2  Date Founded  Authorized in Florida 1937 ‐ M.E. Berry & Associates, Inc.  Home Office Address and Telephone Number  Home Office Address 1800 Eller Drive, Suite 600, Fort Lauderdale, Florida 33316  Telephone Number (954) 921‐7781  Local Address/Number Same as above  Litigation Statement Customer satisfaction is CGA’s primary objective for every project undertaken by the firm. As such, CGA  endeavors to complete each project on time and within budget. CGA is proud to assert that CGA has not  failed to provide products, perform services, or furnished goods for which we have been contracted.    In the last five (5) years, CGA has been involved in the following litigation:  1. James A. Cummings, Inc. vs. Calvin, Giordano & Associates, Inc., Case No: 06‐019973(18) in the 17th  Judicial Court, in and for Broward County.  This case which was filed in 2006 was related to the Palm  Beach County Airport Parking Structure.  The case was settled in August 2007.  2. Yvette Lorenzo, personal representative of the estate and survivors of Orestes Lorenzo vs. Florida  Department of Transportation, City of Pembroke Pines, William J. Russo, Natasha Russo, and Calvin,  Giordano & Associates, Inc., Case No: 0601924(12) in the 17th Judicial Court, in and for Broward  County. CGA was a co‐defendant in a wrongful death action brought by the deceased’s relatives. This  case was filed on or about June 30, 2006, and was settled to the satisfaction of both parties in  September 2008.  3. Vue Condominium Association, Inc. vs. Vue Fort Lauderdale, L.L.C., ET AL, Case No. CACE09012422 .Suit  was filed March 3, 2009. This is a typical condominium construction defect suit involving the developer,  contractor, numerous subcontractors and all the design team.  The condominium association  voluntarily dismissed its claim against Calvin, Giordano February 2011.  4. Walnut Creek Community Development District vs. Standard Pacific of South Florida, GP, Inc., Et Al,  Case No. CACE10019353. Suit was filed May 4, 2010.  The case concerns the failure of an HDPE  drainage system and is in the early stages of discovery.  The other parties include the developer, the  pipe manufacturer and the contractor which is defunct but which may have insurance coverage. Our  understanding is that the problems are primarily the result of defective manufacture of the HDPE pipe  although design and construction deficiencies also are alleged.  5. Armando Alvarez vs. Keith and Schnars, PA, Calvin, Giordano & Associates, Inc., Community Asphalt  Corp., Arazoza Brothers Corporation, Arazoza Brothers Corporation f/k/a Aqualawn, Inc., Vila and Son  Landscaping Corp., a Florida Corporation, Edward R. Wiener, Michael Viscount, Friendly Checker Cab  Co., Inc. d/b/a Friendly Checker Taxi, Case No. 08‐042981‐04. This case was filed September 12, 2008  in the 17th Judicial Court, in and for Broward County. Motor vehicle accident involving a turning vehicle  into path of a motorcycle caused by site line obstruction due to bush not properly maintained. CGA was  responsible for QC of roadway plans.  The case has been dismissed.   6. Calvin, Giordano & Associates and Franklin County, Florida filed lawsuit N0. 4:2012cv00001 in the  Florida Northern District Court against B.P. Exploration and Production Inc. in January 2012. The suit  was filed in an attempt to collect payment from B.P. Exploration and Production for services performed  by Calvin, Giordano & Associates on behalf of Franklin County, Florida.  RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 1| 3  Proof of Insurance   RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 1| 4  Indication of How Long It Would Take to Implement Service After  Authorized to Begin:  Calvin, Giordano & Associates, Inc. can commence work on any project immediately upon receiving the  Notice to Proceed from the City of Sunny Isles Beach. The construction management staff assigned to this  project has the capacity to begin immediately working on the project.  If needed, many of our ancillary  departments are also ready to commence immediately. From that point, all other services would follow  uninterrupted.  Based on our experience with not only the City, but also the regulatory agencies in the area,  CGA can provide an immediate, uninterrupted response to any notices to proceed.    RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 2| 1  QUALIFICATIONS   We began as M.E. Berry & Associates in 1937 and became Berry & Calvin in 1985. Twelve years later, the  transformation was made to Calvin, Giordano & Associates, Inc. (CGA). From the beginning, much of our  reputation was built on repeat business with clients from the public and private sectors. Our success is  reflected in the quality of work we consistently provide and also in the personal approach we take with  each client. The winning combination is affirmed by the fact that CGA grew steadily during an economy that  was not only challenging but also daunting to many larger firms in Florida these past few years. We focus  on adding professionals and technology that address the needs of our South Florida customers instead of  simply adding new branch office addresses.  Founded in Hollywood, our main office is now in Fort Lauderdale, within Port Everglades. Today, our firm  employs more than 200 professionals who provide a broad range of civil engineering, transportation/  traffic engineering, landscape architecture, planning, surveying, permitting, environmental specialty  services, data technology (including Geographic Information Systems), and construction services. In  addition to our Fort Lauderdale office, we now have offices in West Palm Beach, Homestead, Clearwater,  Port St. Lucie, Atlanta, and Jacksonville.  The firm’s municipal experience in South Florida is enviable. We currently or previously served as con‐ sultants to many municipalities including Sunny Isles Beach, Bay Harbor Islands, Surfside, Miami Springs,  Miami Beach, Medley, Palmetto Bay, Weston, Pembroke Pines, Miramar, Wellington, Hollywood, Davie,  Dania Beach, North Miami Beach, West Palm Beach, Riviera Beach, Lake Park, Lantana, Islamorada, and  Marathon.  CAPITAL IMPROVEMENTS & ENGINEERING PLANNING  CGA provides many forms of engineering planning services for municipalities infrastructure needs. It  begins with assessments of the age, condition, and level of service of existing infrastructure, through  projection of the community’s needs far into the future. Using the latest technology and accepted design  methodologies, CGA then develops master plans/programs to be implemented by the municipality to  address the issues revealed in the evaluation process.  We then prioritize and price the necessary  improvements in order to assist the municipality in developing its infrastructure budget and also to assist  in obtaining alternative funding sources for the improvements. These infrastructure improvements vary  widely in scope and can range from simple sidewalk and ADA improvements, to large complicated roadway  and drainage projects.  CGA currently assists the municipalities of Weston, West Park, Surfside, Sunny Isles  Beach and other communities with their capital improvement programs.  Various projects in the program  include various storm water drainage and pump stations, FP&L utility under‐grounding, sea wall  replacements, City Hall governmental facility, park facilities, roadway reconstruction and traffic calming,  decorative street lighting, new parking lot construction, landscaping improvements and water and sewer  improvements.  GENERAL CIVIL ENGINEERING  Throughout all phases of a project, CGA makes a commitment to provide the utmost levels  of quality control and professionalism in the realization of the client’s vision and plan.   Additionally, we take great pride in always seeking mechanisms and means through  which projects can be more sustainable on our economy and environment.  CGA  engineering staff also creates, review, and update the codes, standards and ordinances  for a number of municipalities.  In addition, we perform engineering site plan and  engineering construction permit reviews for Dania Beach, West Park, and Weston.   2 Section  RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 2| 2  Streets  CGA’s roadway design experience ranges from small, two‐lane  residential roadways to large multi‐lane highways and interstates. We  work with the FDOT on re‐grading, striping, drainage improvements,  implementation of ADA requirements, turn‐lane additions, widening,  and median modifications, and public information/participation.   We have designed streetscape improvements with a particular  attention to pedestrian safety for such municipalities as the Cities of  Doral and Weston, and the Town of Bay Harbor Islands.  In additions, we have designed and permitted parking improvements  such as the Dania Beach Park N Go, and the parking fields for  Pembroke Lakes Square, Pembroke Gardens. Specifically, in terms of  roadway/streetscape related services we include;   Roadway Engineering Design & Permitting  Design of Traffic Calming Measures   Corridor Studies  Pavement Marking & Signage   Intergovernmental Agency Coordination  Parking Supply & Demand Analysis   Roadway Beautification Projects  Emergency Evacuation Studies & Planning   Conceptual Engineering & Design  Alternatives Analysis   Major Roadway Improvements Design and  Permitting   Roadway Drainage Design & Permitting  Utility Relocation Design & Coordination   Roadway Lighting Design  Neighborhood Improvement Projects   Parking Lot Design  Milling & resurfacing projects  Civil Engineering for Parks and Recreational Facilities  Calvin Giordano & Associates, Inc. (CGA) has performed engineering services for a number of parks  throughout South Florida. This has involved the design of drainage and under‐drain systems, grading of  sports fields, parking lot/pedestrian/sports field lighting, the design of parking lots, the extension of  utilities to new or renovated structures, and the overall storm water management system design and  permitting.  Some of the parks in which CGA’s engineering have been involved include; Tequesta Trace Park, Eagle Point  Park, Overtown Park,  Weston Regional Park, Cooper City Sports Complex, Bay Harbor Islands 92nd Street  Park, 5th Avenue Linear Park, and many others.  Civil Engineering for Facilities  CGA has provided civil engineering services for many municipal sites including city halls, public works  compounds, community centers, city garages and other city structures.  This includes the design of paving,  grading, and drainage, water & sewer, pavement marking & signage, storm water pollution prevention  plans and offsite roadway improvements among others. We have brought these designs from the  preliminary stages through the permitting, construction, and certification process for a number of  governmental clients.  Water and Sewer  CGA provides professionals who have experience in all aspects of water distribution, water re‐use main,   wastewater collection/transmission main, and lift station design, permitting, and construction, as well as  system evaluation, and analysis.      RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 2| 3  Our water experience includes the design and permitting of new water distribution networks, water  distribution system replacements and upgrades, and booster pump stations.  This includes water main  extension and/or replacement projects for the Cities of Weston, Pembroke Pines, Miramar, North  Lauderdale, Miami Beach, Dania Beach, Hollywood, Lauderhill, and the Towns of Davie, Surfside, and Bay  Harbor Islands.  In addition, we have modeled existing water distribution systems for the Cities of Weston,  and Lauderhill, as well as the Town of Davie. This involved assembling existing as‐built, permit, and atlas  data, and supplementing it with surveyed field data to build the existing model in WaterCad.  CGA then  proceeded to model improvements into the system for enhanced system performance, to account for future  demands, and to accommodate future anticipated redevelopment. The modeled improvements were  prioritized, budgeted and included in the Capital Improvement Plans for the municipality.  Our wastewater experience includes the design, permitting, and construction of collection systems,  transmission systems, lift stations, master pump stations, in‐line booster pumping stations, and force  mains.  CGA has or is currently in the process of modeling the existing wastewater transmission systems  (lift stations and force mains) for the Cities of Weston, Pembroke Pines, Opa‐Locka, Cooper City, Dania  Beach, and the Town of Davie. As with the water distribution system models, we assembled existing as‐ built information, permit information, and atlas data, and supplemented it with surveyed field data to build  the existing computer model. Similar to the water distribution system evaluation and analyses, CGA  modeled improvements into the system for enhanced system performance, to account for future demands,  and to accommodate future anticipated redevelopment.  The necessary improvements were then  integrated in the municipality’s Capital Improvement Plan. In addition, CGA recently performed an I&I  study on the wastewater collection system of the Town of Surfside.   Our team has provided designed pump stations for variety of application including storm water, shallow  wells, deep wells, wastewater lift station, wastewater effluent disposal, potable water distribution, and in‐ line booster station.  As such, we have worked with and coordinated with all design disciplines including  structural, electrical, and instrumentation and controls.  We have experience with a variety of pumps and  pump station types.  As part of the pump station design we also provided hydraulic modeling, solids  removal facilities (i.e. bar racks, strainers) design and emergency power fuel system design. We have  worked on pumps with capacities ranging from 0.1 MGD to 200 MGD (320 CFS).    CGA has designed, permitted, and managed the construction of new lift stations, and lift station  rehabilitation projects for the Cities of Weston, Pembroke Pines, Dania Beach, Miramar, North Lauderdale,  Hollywood, Cooper City, Opa‐Locka, and the Town of Davie   Storm Water Management   CGA has been the Drainage/Storm Water Management Engineer for the South Broward Drainage District  (SBDD) since 1990. The firm was originally contracted to develop the first and only district‐wide basin  hydrologic and hydraulic analysis and storm water comprehensive plan. CGA is also the District Engineer for  Indian Trace Development District and Bonaventure Development District  and has completed basin wide hydrologic and hydraulic modeling, including  the master drainage system modeling, analysis and pumping station  upgrades, large‐scale mitigation/ wetlands plans and the updates of the  comprehensive plan. CGA uses the latest in advance computer‐assisted  software technologies such as Advanced Interconnected Pond Routing  (ADICPR), Hydraflow, Cascade and other current computer programs.     RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 2| 4  As District Engineer for ITDD, and BDD, our responsibilities include the review of all  construction plans and specifications for conformance with the District criteria, as  well as representation at District Board meetings to address technical and  engineering issues.  In addition, CGA has been successful in obtaining several millions  of dollars in grants to accomplish the District’s goals and objectives.  Furthermore, CGA has also developed storm water master plans for several  municipalities including the Cities of Dania Beach, Lauderhill, West Park, Weston and  the Town of Surfside.  Within these cities, we have provided a number of storm water‐ related activities such as storm water modeling, drainage calculations, pump station  design and/or pump station rehabilitation, NPDES MS4 compliance, culvert design,  canal extensions and other related hydraulic structures.  Our experienced drainage engineers keep abreast of the latest EPA, FDEP and SFWMD regulations with  respect to drainage issues.  They regularly summarize new regulations, their impact on clients and  recommend actions to comply with the new regulation(s).  ELECTRICAL ENGINEERING  CGA’s Electrical Department has broad capabilities for the infrastructure and the end use development for  municipal, commercial, and industrial projects. The types of services provided include:   Power Distribution  Communication System Distribution   Interior Lighting  Telephone   Area Lighting  Cable TV   Street Lighting  SCADA   Sports Lighting  Energy Conservation  SURVEYING  The Surveying and Mapping Division of CGA utilizes the latest in cutting edge technology when preparing  surveys including GPS equipment, automated data collection, Laser Scanners, Underground utility  detection technologies and a Vacuum/Slurry subsurface excavation system called the VaXcavator that  exposes existing underground utilities.  Operated by one of the field survey crews, it allows us to obtain  sub‐surface horizontal and vertical locations required for design, while realizing cost and timesavings for  our clients.  Additionally, our state‐of‐the‐art Hypack software with Odom sounder allows us to offer  hydrographic surveying services.  By integrating with our Trimble GPS units, the equipment creates a three‐ dimensional model of the water body being surveyed and significant savings for our clients.  Recognizing the value to our clients, CGA was among the first firms in Florida to acquire the 3D Laser  ScanStation.  Our Surveying and Mapping staff can now scan virtually anything in half the time of  conventional methods, with a level of detail not available before.  The ScanStation can take a virtual, detailed  snapshot of a site including ceilings, undersides of bridges, elevated pipe racks, tall facades, columns and  towers.  Areas that were previously difficult to access.  It collects millions of data points of all items in a 360°  horizontal and 270° vertical field of view, allowing a full field of view. This eliminates an additional visit to  capture data not covered in the original scope of work or the question as to where a shot was taken of an  object. The ScanStation captures all the items at once in a permanent record that can be filed, including  hundreds of high quality photos, and graphics or animations, from 3D to virtual walk‐through of sites.  It is  ideal for litigations, client presentations or commission meetings. For added convenience, the survey data  can be exported to whatever format our clients need, whether CADD or other software.     RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 2| 5  Process  The process we employ is equally as important as the equipment we deploy.  All survey requests are  assigned to a licensed surveyor and mapper who acts as the project manager.  In addition, fieldwork is  researched and calculated in the office for the crews prior to going out into the field.  The required data is  collected electronically using total station instruments, and then downloaded at the end of the day into our  computer system for analysis and processing. This data is then provided to our technicians to create the  final product, all under the watchful eye of the project manager.  The final product is delivered to the client  after undergoing our Quality Assurance/Quality Control process.   Safety  Safety is a primary concern at Calvin Giordano & Associates.  Therefore, a mandatory maintenance of traffic  (MOT) training is held twice a year for our field crews and field crew supervisors.  Monthly Safety meetings  are held for the field personnel with a different topic discussed each month.  Our field vehicles are  equipped with strobe lights, proper signage, safety vests and cones.  One­Stop Shopping  The Surveying and Mapping Division offers the services, staff and technology to ensure that every survey  project is executed successfully, and to our clients’ satisfaction.  Our land survey and mapping services  include:   Boundary surveys  Utility and infrastructure layout   Record (as‐built surveys)  Prepare legal descriptions   Sub‐surface utility location surveys  Hydrographic survey   Platting services  Route survey for engineering design   Right‐of‐way mapping  Condominium document preparation   Topographic surveys  Annexation maps  Diverse Clientele­Cities, Utilities and the General Public  The Surveying and Mapping Division client base includes land development clients, FPL, Florida  Department of Transportation, Broward County Real Property Division and many cities within Broward,  Miami‐Dade and Palm Beach Counties, as well as the general public.  Survey Crews and Equipment  The Survey department maintains seven (7) field crews out of the Fort Lauderdale office and three (3) field  crews out of our West Palm Beach office. Our firm has nine (9) survey grade GPS systems available and we  are capable of both static and RTK GPS surveying.   A standard inventory of survey equipment for each crew includes:   Total Stations data collectors and levels  Tracemaster Pipe and Cable Locator   Hydrotrac HT 100 Echo Sounder  Leica Scan Station II   Geopack CAICE, EFB, CEFB  AutoCAD   Civil 3D 2008  VSI VaXcavator (slurry excavation system)   Microstation V8  Trimble Geomatic Office   Vector (GPS baseline processing)  AutoCAD LDD 2008   Cyclone 5.6 Laser Scanning software    RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 2| 6  CGA has provided landscape architecture services on a continuing contract basis for the past three years. They have distinguished themselves by their customer care service, diligence and thoroughness. Diane Colonnna, AICP Executive Director, Delray Beach CRA CONSTRUCTION MANAGEMENT  CGA believes key elements of construction management include: contract  negotiation, implementing quality control and assurance programs, contract  document review, shop drawing approval, review and administration of contractor  RFI’s, observation of field activity to assure construction is completed in  accordance with construction documents, payment request recommendation,  change order administration, environmental and NPDES monitoring, field report  and documentation, as‐built record drawing preparation, and agency/permit  closeout documentation and certification. As part of being a Municipal Consultant  for several local governmental entities, we are constantly involved and up to date  in all related agencies requirements and procedures; we have served as  construction management for over $100 million dollars Capital Projects,  successfully assisting in the bidding, selection of contractor, construction and final  certifications, in conjunction with different design consultants and clients.  ENVIRONMENTAL SPECIALTIES AND PERMITTING  The diverse and in‐depth work experience of our environmental staff provides us with a critical  understanding of current local and regional environmental planning and permitting issues and the historic  impacts that have affected the southeast region, as well as the adaptive strategies that will be necessary to  address climate change and rising sea levels. CGA’s multi‐disciplinary approach is reflected in the  integrated partnership of our environmental department with the many disciplines of our firm.    The integration of technical field skills, regulatory details and overall project  requirements allows us to address project needs from inceptions to  completion. Our environmental staff routinely coordinates details with  owners, developers, design engineers, surveyors, as well as governmental  agency. It is our goal to obtain reasonable, environmentally sensible  solutions for our clients.   LANDSCAPE ARCHITECTURE SERVICES   The Landscape Architecture Department has a unique blend of qualified professionals that provide a  variety of interests and personal expertise as an underlay to our Landscape Architectural services. They are  educators, community leaders, activists, volunteers, artists, designers, sculptors and LEED Accredited  Professionals. This mix of talent allows us to provide our clients with holistic, well‐rounded design  solutions that, beyond considering all the functional and implementation‐related issues needed to be  resolved, ensure a design product that, once built, will provide for longevity, experience, value and unique  identities essential to establishing community branding.  This is supported by our qualified, award‐winning  staff, including Registered Landscape Architects with more 60 years of collective professional experience,  and by a strong team of supporting experts.    The Landscape Architecture Department has considerable  talent and ability within its ranks and also has the resources  of the rest of the company to provide all services – expected  as well as unexpected – that may be needed during the course  of any landscape architectural project. The Department has  been able to successfully complete less traditional tasks,  including applying for and obtaining grants to fund  landscaping projects, such as two separate $50,000 grants for  roadside landscaping for the City of Weston, and the City of  Dania Beach’s receipt of a $50,000 grant for median  landscape improvements.     RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 2| 7  Customer satisfaction is our primary goal, whether a project involves development or redevelopment,  inspection, reporting or design, private client or a public entity. Our broad range of project experience  includes:  Comprehensive plans   Grant identification, grant application  preparation and processing   Historic preservation   Hardscape design   Graphic design and presentation   Trail and open space design   Feasibility studies   Habitat restoration   Vegetative habitat delineations and  assessments   Arborist and tree mitigation services   Invasive exotic vegetation monitoring and  reporting services   Wildlife monitoring and reporting  services   Development of wetland mitigation  options with an option of profitable cost   Master planning Wetland mitigation monitoring and  reporting services   Landscape and site planning urban  revitalization   Greenway and streetscape design   Recreational facilities design   Environmental impact studies   Site analysis evaluations   Environmental permitting and  coordination with all required agencies   Vegetation surveys   Natural resource and preservation  monitoring and reporting services   Wildlife habitat assessments   Wetland delineations and wetland  functionality assessments   Design of wetland mitigation plans for  habit creation or enhancement on/off site   Community Branding  Sub­Consultant(s)  Pistorino & Alam Consulting Engineers, Inc. (P&A), formerly known as Herbert M. Schwartz and Associates, was established in Miami in 1967. P&A is multi-disciplined engineering firm. The firm has extensive experience and offers a full range of Structural, Civil, Mechanical and Electrical Engineering Design and Construction Administration Services.  Masuen Consulting LLC is a Water Resource and Horticultural Consulting company  comprised of landscape architects, horticulturalists, agronomists, irrigation designers,  landscape designers, site planners, construction managers, and water resource engineers  dedicated to providing their clients with services focused on water conservation, long‐term  value, operational efficiencies, regulatory compliance, and exemplary service. The company is  comprised of both a 'Design and Consulting Division' and a 'Technical Services Division'.       RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 2| 8  Licenses       RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 2| 9       RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 2| 10       RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 2| 11  Certificate of Authorization  Occupational License  Relevant Experience  See following pages for relevant project experience.   12-XXXX_CS_0014 HERITAGE PARK GARAGE_SIB HERITAGE PARK GARAGE  Sunny Isles Beach, Florida  Client City of Sunny Isles Beach Contact information at time of project: Rick Conner City Manager Jorge Vera Asst City Mgr Gio Batista Public Works Director 18070 Collins Avenue Sunny Isles Bch, FL 33160 (305) 792-1912 Project Date 2009 - 2011 Services Provided Construction Management Consulting Project Manager Joel T. Wadsworth Team Members Chris Giordano The City of Sunny Isles Beach requested Construction Consulting services for the Heritage Park Garage & Park construction. The improvements included a six‐story 490‐ space garage, nearly four acres of landscaped park complete with elevated stage, pavilion, seatwalls, interactive water fountain and commemorative wall. CGA’s services included owner’s representation comprising of on‐site documentation of progress, conducting weekly construction progress meetings with contractor and City, documenting progress to the City and review and comment on all contractor change order requests.   Page 2| 12 12-xxxx_GOV_Surfside Community Center SURFSIDE COMMUNITY CENTER  Surfside, Florida              The Surfside Community Center and Aquatic Facility is a beachfront property located in  the Town of Surfside between Collins Avenue and the beach, across from Surfside’s  Town Hall. This new 7,000‐square‐foot, multi‐purpose facility includes a recreational  pool for lap swimming, a children’s activity pool, a whirlpool spa, a plunge pool with  slide and Funtraptions Play equipment with slides, gushers and fountains. The facility  also includes an activity room, snack bar, first aid station and conference room. There  are outdoor tables, shade canopies, lounge chairs, landscaping and secure enclosure  around the facility with one entry way to the beach. The plan also provides for future  expansion. The Town contracted CGA as Project Manager and providing construction  services. The center’s architect is AECOM Design and the construction contractor is West  Construction.  Client Town of Surfside Contact information at time of project: Roger M. Carlton City Manager 9293 Harding Avenue Surfside, FL 33154 305-861-4863 Project Date 2006 - 2011 Services Provided Project Management Construction Services Principal-in-Charge George Keller, AICP Team Members Chris Giordano Page 2| 13 12-XXXX_PK_0001 DIPLOMAT RESORT DIPLOMAT RESORT HOTEL COMPLEX  Hollywood and Hallandale Beach, Florida  Client Diplomat Properties, LP Contact information at time of project: Ed Tupling 1995 E. Hallandale Bch Blvd Hallandale Beach, FL 33099 (954) 457-2000 Project Date 1997 - 2002 Services Provided Survey Civil Site Design Construction Management Planning Today’s Diplomat Resort Hotel is a 41‐story dual tower with more than 1,000 guestrooms overlooking the Atlantic Ocean in Hollywood, Florida. The hotel is an 111,400‐square‐foot complex featuring two eight‐story parking garages, a championship golf course, tennis facilities, yacht slips, swimming pools, shops, restaurants, meeting rooms, and convention center that includes banquet halls. An associated condominium tower is being planned. The Diplomat also includes a 30,000‐ square‐foot, world‐class European‐style spa in Hallandale Beach.    CGA prepared the civil/site design of the hotel and country club area, including a stormwater management system, master and sanitary sewer system, and fire protection calculations. Site and construction surveys were also conducted. In addition to the civil/site design, CGA designed the widening and reconstruction of SR A1A to accommodate the resort’s traffic flow. The existing roadway was widened outside of the existing right‐of‐way, which required a significant amount of drainage and utility coordination. CGA worked with FDOT and constructed a pedestrian bridge that crosses A1A, linking the hotel to a complex of retail stores and dining establishments along the Intracoastal Waterway.     CGA also prepared the planning entitlements (plat, site plan, land use and zoning).   Page 2| 14 12-XXXX_HO_0001 JACK STH HOSP EXP JACKSON SOUTH COMMUNITY HOSPITAL   EXPANSION AND RENOVATION  Miami, Florida   Client Jackson Health Systems Through MGE Architects Contact information at time of project: MGE Architects 150 Alhambra Circle Suite 700 Coral Gables, FL 33134 (305) 444-0413 Ms. Patricia Rice –Spivey Project Manager Date of Services 2007 - 2010 Services Provided Civil Engineering Survey Construction Services The expansion and renovation project included a 157,000‐square‐foot expansion of the existing Jackson South Community Hospital facility, which effectively doubled its size. The project also included the renovation of approximately 72,000 square feet of existing space. The project was financed through Miami‐Dade County General Obligation Bonds (GOB) passed by voters in 2005. Improvements included the expansion of the emergency room and surgical facilities and added 57 new private patient rooms to the 199‐bed facility.  CGA provided surveying, civil engineering, and construction management services on the project as a sub‐consultant to the architect, MGE Architects based in Coral Gables.  Page 2| 15 12-xxxx_HO_0005 Memorial Hospital_ Mirarmar Parking Garage MEMORIAL HOSPITAL WEST PARKING GARAGE   Pembroke Pines, Florida  Client South Broward Hospital District (dba Memorial Healthcare System) Contact information at time of project: Joe Alcure, Director of Construction and Design Services Memorial Healthcare System 703 N. Flamingo Rd Pembroke Pines, FL 33028 (954) 433-7184 Date of Services 1996 - 1998 Services Provided Civil Engineering Construction Services Calvin, Giordano & Associates, Inc. (CGA) has a long and productive association with South Broward Hospital District. CGA has collaborated in particular with Memorial Healthcare System at Memorial West Hospital since initial landclearing and groundbreaking.  In 1996, South Broward Hospital District (dba Memorial Healthcare System) constructed a 6‐story parking garage on the southern area of the hospital property. CGA provided civil engineering design and construction inspection services for the project. CGA’s services included oversight on the re‐location of utilities required for the new construction as well as the installation of new drainage and water systems.  CGA was onsite from commencement through site engineering, construction and project closeout. CGA inspectors and project mangers successfully coordinated the new construction to integrate properly with the existing hospital infrastructure.  Page 2| 16 12-xxxx_LA_0065 The VUE-Ocean Club THE VUE CONDOMINIUM AND GARAGE   Cornerstone Development Company  Client Cornerstone Group Contact information at time of project: Richard LaMandon Cornerstone Group 2121 Ponce de Leon Blvd. Penthouse 2 Coral Gables, Florida 33134 Project Date 2004 Project Value $500,000 Services Provided Engineering Landscape Architecture Key Personnel Jonathan Cooper, PE Tammy-Cook Weedon, ASLA, RLA, LEED AP The Vue is a beautiful 16‐story twin tower condominium project overlooking the Atlantic Ocean on Fort Lauderdale Beach.    CGA prepared the civil/site design of the hotel and country club area, including a stormwater management system, master and sanitary sewer system, and fire protection calculations.  CGA also retained to provide lush landscape design.  Page 2| 17 12-xxxx_PK_0009 Liberty Grand Hotel LIBERTY GRAND HOTEL & PARKING GARAGE  Hollywood, Florida  Client Liberty Grande LLC Contact information: Moses Bensusan Liberty Grande LLC 828 S. Dixie Highway Hallandale Beach, FL 33009 Project Date 2005-2007 2011 to Present Services Provided Civil Engineering Surveying Principal in Charge Dennis Giordano Project Manager Douglas Taylor, PE Project Team Jon Cooper, PE Approx. CGA Fees $75,000 The Liberty Grande Hotel and Parking Garageislocated on the east side of SR A1A between Filmore Street and Indiana Street in Hollywood, Florida. Calvin Giordano & Associates, Inc. (CGA) is providing engineering and surveying services for the project within the Beach CRA area in Hollywood. The hotel complex consists of 225 condo/hotel rooms, a restaurant, a spa, and a 226‐space parking garage.  The initial services involved surveying defined the base flood and Coastal Construction Control Line adjacent to the property and also identified above and below ground existing improvements.   CGA then prepared the civil engineering improvement plans for the hotel and garage. This involved water and sanitary extensions to the City of Hollywood system connecting within the FDOT AIA right‐of‐way. These utilities were permitted through the City, Broward County, and FDOT. The stormwater runoff issues were dealt with through the construction of Class V stormwater drainage wells. These wells were permitted through Broward County Environmental and the Florida Department of Environmental Protection (FDEP). Water Quality was provided in exfiltaration trenches.  Page 2| 18 12-xxxx_WTP Improvement_Davie WTP IMPROVEMENT  Davie, Florida  Client Town of Davie Contact information at time of project: Bruce Taylor Utilities Director Utilities Department 6591 Orange Drive Davie, Florida 33314 (954) 327-3741 Project Date 2003 Services Provided Civil Design Surveying Construction Management The design of this water treatment plant improvement project began with a hydraulic analysis of the Town’s distribution system and evaluation of the plant’s storage and pumping capabilities. The results of the analysis led to the recommended design of:   2‐million‐gallon pre‐stressed concrete storage tank   two new 100‐HP high‐service pumps   one new raw water well   rehabilitation of an existing raw water well   more than 300 feet of raw water main   more than 5,000 feet of transmission main to increase system pressure in the eastern area  The project was bid within 2% of the engineer’s estimate.  CGA provided Civil Design Services, Surveying Services and complete Construction Management Services. CM Services include a full time onsite manager as well as oversight of all testing and special inspection sub‐consultants.  Page 2| 19 12-xxxx_LA_0075 Weston Library Park LIBRARY PARK  Weston, Florida  Client City of Weston Contact Information at Time of Project John Flint City Manager 17200 Royal Palm Blvd Weston, Florida 33326 (954) 385-2000 jflint@westonfl.org Project Date 2008 Services Provided Landscape Architecture Surveying Site Planning and Design Irrigation Design Civil Engineering Electrical Engineering Construction Administration Permitting Principal in Charge Dennis J. Giordano Project Manager Michael Conner, ASLA, RLA Team Members Bob Jackon, PSM Sabrina Baglieri Construction Cost $2.2 Million Firm’s Fee $150,000 In 2005, the City of Weston approached CGA with the idea to design and develop a passive park on six acres of land located adjacent to the new Weston Branch of the Broward County Library.  The City received a small grant from the State of Florida, Division of Recreation and Parks to assist with the development of the park. CGA oversaw all aspects of the development of the park from the conceptual design and site details to the permitting, bidding and construction.  From the beginning, the City wanted a strong connection between the park and the Library. A paved walkway leads visitors from the Library directly to a large circular fountain and the “Ring of Florida Authors.”  The low walk and seating area contains 20 bronze plaques highlighting the literary works of famous authors and playwrights with a connection to Florida. In addition, there is a series of gazebos with terraced seating to accommodate groups from 5 to 6 people, up to 40 to 50 people, in size.  The design of the park also features a “walk of discovery,” consisting of a series of 10 bronze plaques inlaid in the park’s meandering sidewalk that depicts the history of the area dating back to the Tequesta Indians.  The park project also includes both site lighting and specialty lighting, as well as a restroom building and a large open, grassed area.  All of the walkways, seating areas and site features are completely A.D.A accessible.  The total cost of the park was $2.2 million, and it opened in October 2008. Page 2| 20 12-xxxx_LA_0083 BHI 92nd St Park 92nd STREET PARK  Bay Harbor Islands, Florida  Client Town of Bay Harbor Islands Contact information at time of project: JC Jimenez Asst. Town Manager 9665 Bay Harbor Terrace Bay Harbor Islands, FL 33154 (305) 866-6241 jcjimenez@ bayharborislands.net Project Date 2010 Services Provided Park Master Planning Landscape Design Site Furnishing Construction Administration Permitting Principal in Charge Dennis J. Giordano Project Manager Tammy Cook-Weedon, ASLA, RLA, LEED AP Team Members Gianno Feoli, ASLA, AIA Sabrina Baglieri Construction Cost $450,000 Firm’s Fee $40,000 As a component of the Town‐wide parks and open space master plan discussions moderated by CGA, an under‐utilized parking lot was converted to a park space. The program for the park included an open green lawn area that could serve for multiple functions and a dedicated dog run area. Under a very tight and demanding schedule, CGA designed, permitted and provided construction administration services for the entirety of the park. At its core, the park design sought to establish an urban relationship with its surrounding walk‐to context. The design provides an urban plaza that is open and accessible at all times, in addition to the multi‐use field and dog areas, which are only open during daytime hours. The design was articulated to provide as much space as users can personalize with various seating options to facilitate visitors’ use of the facilities, as well as exercise equipment, doggie agility equipment, water fountains, solar‐powered lighting and ample use of shade.  Page 2| 21 12-xxxx_LA_0054 Shops at Pembroke Gardens SHOPS AT PEMBROKE GARDENS   Pembroke Pines, Florida  Client Duke Construction Contact information at time of project: Brent Albertson, PE Development Services Director 4700 Millenia Blvd. Suite 380 Orlando, FL 32839 Project Date 2005 - 2008 Services Provided Rezoning Design Guidelines Platting Civil Design Landscape Design Surveying Principal in Charge Dennis J. Giordano Project Manager Tammy Cook, ASLA, RLA, LEED AP Team Members Douglas Taylor, PE Gianno Feoli Erin Sudman Marcos Mendoza Construction Cost $6.19 Million Firm’s Fee $495,000.00 Shops at Pembroke Gardens is a 400,000 sq. ft. Lifestyle Center designed to promote a vibrant, dynamic, and successful pedestrian retail environment. Located on approximately forty (40) acres within the City of Pembroke Pines, Shops at Pembroke Gardens provides a unique pedestrian shopping experience consisting of a variety of national, regional, and local retailers.  Anchoring the Shops at Pembroke Gardens are Loehmann’s, DSW, Barnes & Noble, and Golf Galaxy.    CGA processed the plat, master site plan, and rezoning for the site.  The site was rezoned from A‐1 to Planned Commercial Development (PCD), and CGA worked with the developer and the City to create design guidelines tailored specifically to the project.  The guidelines were written to provide sufficient flexibility to each retailer to bring forth its unique image and identity, resulting in a true downtown shopping experience.      Additionally, CGA processed site plan amendment applications for the Lifestyle Center’s perimeter buildings, each of which required separate architectural review and approval. Page 2| 22 12-xxxx_LA_0047 Pineapple Grove Pking Lot PINEAPPLE GROVE PARKING LOT  Delray Beach, Florida  Client City of Delray Beach CRA Contact Information at Time of Project Jeff Costello Assistant CRA Director 20 North Swinton Avenue Delray Beach, FL 33444 (561) 276-8640 (561) 276-8558 (Fax) costelloj@ ci.delray-beach.fl.us Project Date Sept 2008 – Oct 2009 Services Provided Landscape Architecture Project Management Site Planning Irrigation Design Civil Engineering Construction Documents Construction Administration Principal in Charge Dennis J. Giordano Project Manager Tammy Cook-Weedon, ASLA, RLA, LEED AP Team Members Gianno Feoli, ASLA, AIA Michael Conner, ASLA, RLA Marcos Mendoza Patrick Figurella, PE Sub-Consultant – Masuen Mitch Walker Construction Cost $134,000 Firm Fee’s $34,000 The Pineapple Grove area is located within the Central Core District of Delray Beach’s CRA. This area is a unique, arts‐oriented section of the downtown that contains a mix of commercial, residential and Industrial uses. It was designated a Florida Main Street Community and adopted by the City in 1998. The objectives of the CRA’s plan for this area is to transform Pineapple Grove from a vehicular‐oriented to a pedestrian friendly environment. One mechanism for accomplishing this task is to allow infill development to occur within the existing private parking lots along Pineapple Grove Way. This would provide continuous storefronts along the street, which would encourage greater pedestrian movements. To this end, CGA transformed a vacant lot in the Pineapple Grove Area into a much needed parking within an Industrial zone on N.E. 3rd Avenue. This project did not just introduce 14 parking spaces, but incorporated a central plaza, raised planter seat walls, incorporated the City’s signature lighting, provided for two areas to display public art, and included handicap access. To expand the CRA’s desire to incorporate green principals into the design, this project was the pilot for utilizing pervious pavers both in the plaza and parking spaces. LED lighting was also included as well as a low flow water conserving irrigation design. The large Cathedral Oaks proposed were included to provide a shady space for pedestrians and artists and also to reduce the heat island effect. Page 2| 23 12-xxxx_LA_0003 BHI Kane Concourse KANE CONCOURSE ENHANCEMENTS  Bay Harbor Islands, Florida  Client Town of Bay Harbor Islands Contact information at time of project: Ron Wasson 9665 Bay Harbor Terrace Bay Harbor Islands, FL 33154 (305) 866-6241 Project Date 2010 Services Provided Landscape Architecture Surveying Site Planning & Design Civil Engineering Electrical Engineering Construction Administration Permitting Irrigation Project Manager Gianno Feoli, ASLA, AIA Team Members Bob Jackson, PSM Robert Roush, PE Sabrina Baglieri Construction Cost $700,000.00 Firm’s Fee $65,000 Calvin Giordano & Associates, Inc. designed and implementedsidewalk improvements for the entirety of Kane Concourse’s Business District.  The intent of the project is to update the look and experience of the concourse, consistent with the vision outlines in their adopted master plan, without compromising the integrity of the corridor’s importance as one of the few remaining stretches to boast predominantly well‐ preserved MiMo buildings. The project’s scope includes paving design, landscape planting improvements, lighting and street furnishings.  The project is presently in the permitting phase, and CGA will be coordinating the Town’s improvements with FDOT’s plans to provide improvements on the corridor’s roadway.  The project was funded through the LAP process, for which CGA provided all administrative services.  Page 2| 24 12-xxxx_LA_0020 Gator Run Park-Weston GATOR RUN PARK  Weston, Florida  Client City of Weston Contact information at time of project: John Flint City Manager 2500 Weston Road Suite 101 Weston, Florida 33331 (954) 385-2000 Project Date 2002 Services Provided Park Master Planning Site Design Landscape Architectural Irrigation Design Civil Engineering Construction Administration Principal in Charge Dennis J. Giordano Project Manager Tammy Cook-Weedon, ASLA, RLA, LEED AP Team Members Gianno Feoli, ASLA, AIA Marcos Mendoza Sabrina Baglieiri Construction Cost $400,000 Firm’s Fee $40,000 Gator Run Park is located in the City of Weston adjacent to Gator Run Elementary School. Early design concepts incorporated three‐dimensional landforms to create a more spatially interesting and interactive park. The landforms were limited in size to the amount of muck fill that had been relocated on the site. Thus, careful consideration and calculation of fill material was undertaken. Three earthen mounds of varying elevations were designed along with appropriately graded handicap accessible walkways. The range in topography facilitated a range of planting concepts and diverse programmatic elements. The park is primarily passive in nature with ample walk and pathways. There are several active elements including a multi‐purpose field associated with the adjacent school and a sand volleyball area. One goal or program element for the park was to create an area designed to attract butterflies, display native plant species, and serve as a nature trail. Trails that are part of a larger network, with greater grade changes, are intended for more rigorous activities including jogging, and/or rollerblading. Page 2| 25 12-XXXX_CS_0015_HOLLYWOOD RADIUS CONDO RADIUS CONDOMINIUM  Hollywood, Florida Client Lake Investment and Development Contact information at time of project: Loretta Easton Glenn Ridge Connector #70 Atlanta, Georgia 30342 Project Date 2003 – 2009 Services Provided Engineering Surveying Permitting Construction Services Principal in Charge Dennis J. Giordano Project Manager Jon Cooper, PE Firm Fee’s $220,000 Development of approximately 5 acres into a mixed‐use 400‐unit high‐rise community development in the heart of downtown at Young Circle in Hollywood, Florida.  This project within the Hollywood Community Redevelopment Area required extensive utility reconstruction including all City sewer and water as well as undergrounding utilities. Compliance with City redevelopment standards led to a promenade walkway with shopping and outdoor dining as this project integrating this development with Downtown Hollywood including a cross parking agreement for shared parking garage facilities.  Project Specifics   Located in Downtown Hollywood at Young Circle within the Community Redevelopment Area   FDOT coordination required led to on‐street parking and right‐of‐way agreements    Undergrounding of existing overhead utilities and replacement of all City infrastructure   Cross parking agreement reached with City for shared parking garage facilities  Page 2| 26 RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 3| 1  STAFFING   Project Manager Experience  Our selected Project Manager, Joel Wadsworth is an accomplished strategic  planner, leader, and construction/facility management specialist with more  than 25 years of experience serving an instrumental role in the delivery of  top quality, multimillion‐dollar real estate developments. He held positions  as estimator/purchasing agent, assistant superintendent, superintendent,  project manager and VP Director of Construction for Trafalgar Developers/  Associates, Inc. a subsidiary of General Electric Company. He held similar  high level positions with the HDC Group and International Sales Group  assuming responsibilities and authority for the budgeting, contracting and  construction management of a number of complex high‐end residential and  commercial real estate developments.   Mr. Wadsworth has the experience to serve the City of Sunny Isles Beach in this capacity having served as  a construction manager for multiple continuing services construction management/capital  improvement projects for Miami Dade Municipalities.  Throughout his career, Mr. Wadsworth has gained experience from every aspect of the project.  He has  completed projects as a general contractor, developer and as an owner’s representative.  This vast  experience allows Mr. Wadsworth to have a 360 degree view of the project, foresee future issues and  resolve them prior to their occurrence.  Mr. Wadsworth’s experience is outlined below:  Project Manager – Construction Services Division ­ Calvin, Giordano, & Associates, Inc. Fort  Lauderdale, Florida. Capital Projects Manager – Miami Dade Municipalities and Broward County.  Director of Development and Construction Division: International Sales Group LLC, Aventura,  Florida. Organization specializing in real estate sales/ marketing within territory covering the US and the  Caribbean. Provider of consulting services in the areas of project concept, feasibility, related market  studies, and cost analysis.  Company generates from $200M to over $500M sales annually and is comprised  of 25‐200 staff members. Worked collaboratively with clients in the planning of real estate development  projects, offering expertise in the areas of concept, markets, feasibility, constructability, and expense / cost  forecasts. Deliver expert management of construction ventures, serving as client representative focused on  the ensuring of the effective, timely, and quality orchestration of all project phases in compliance with  requirements.  Director of Construction: HDC Group LLC, Miami, Florida.  Leading corporate representative securing  key accounts and delivering expert consulting in the areas of research, documentation, and project  planning / development.  Served as Construction Manager and Owner’s Representative.   Director of Construction, Trafalgar Associates Inc., Miami, Florida. Primary leadership and supervisory  force in the areas of land development and construction of apartments, single‐family homes,  condominiums, and commercial structures. Secured government approval/permits, planned and  monitored site development, controlled budgets, scheduled work, hired contractors, coordinated  construction phases, and ensured the safe/timely/cost effective/quality completion of all projects.  Liaised,  worked closely with, and managed attorneys, architects, engineers, government representatives,  subcontractors, sales managers, superintendents, foremen, labors, purchasing specialist, bookkeepers and  customer service representatives.   3 Section  RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 3| 2  Organizational Chart    Resumes  See following pages for staff resumes.  PRINCIPAL­IN­CHARGE  Dennis J. Giordano  Calvin, Giordano & Associates, Inc.  PROJECT MANAGER  Joel Wadsworth, GC  Calvin, Giordano & Associates, Inc.  CITY OF   SUNNY ISLES BEACH  CONSTRUCTION   PROGRAM MANAGEMENT  Roderick Myrick, PE, GC  George Guerrero, GC  Calvin, Giordano & Associates, Inc.  MUNICIPAL ENGINEERING  SUPPORT SERVICES  Karl Kennedy, PE  Robert McSweeney, PE  Calvin, Giordano & Associates, Inc.    SURVEY SUPPORT SERVICES  Robert Jackson, PSM  Greg Clements, PSM  Calvin, Giordano & Associates, Inc.    LANDSCAPE ARCHITECTURAL  SUPPORT SERVICES  Tammy Cook, RLA, LEED AP  Gianno Feoli, AIA, ASLA  David Grasso‐O’Brien, LEED AP  Hien Nguyen, ASLA, ISA, FACE  Calvin, Giordano & Associates, Inc.  CONSTRUCTION  OBSERVATION/INSPECTION/  SHOP DRAWING REVIEW  Sabrina Baglieri  Bruce Bernard  Hanzel Rubi  JC Echavarria  Calvin, Giordano & Associates, Inc.     STRUCTURAL ENGINEERING  SUPPORT SERVICES  Tahir Iqbal, PE        Pistorino & Alam, Inc.  ASSISTANT   PROJECT MANAGER  Chris Giordano, SMC  Calvin, Giordano & Associates, Inc.  QUALITY ASSURANCE/  QUALITY CONTROL  Jon Cooper, PE  Calvin, Giordano & Associates, Inc.    CONSTRUCTABILITY REVIEW  Rick DeRosia, PE  Don Windham  Calvin, Giordano & Associates, Inc.   IRRIGATION   SUPPORT SERVICES  Todd Mohler, RLA  Judy Jensen, LEED AP  Masuen Consulting, LLC.  JONATHAN N. COOPER, PE  Associate, Director of Quality Assurance  SUMMARY OF QUALIFICATIONS   Mr. Cooper has over 24 years of experience in civil and environmental engineering  including a wide variety of projects from utilities infrastructure and water treatment to  land development and roadway design.  His wide‐ranging skill set, attention to detail  and sagacity qualified Mr. Cooper to be chosen to serve as Director of Quality Assurance  for Calvin, Giordano & Associates.  In his role as Director, Mr. Cooper brings his skill in  the design of civil engineering projects, including water and wastewater treatment  plants, water mains, wastewater force mains, reuse application systems land  development projects, hydraulic computer modeling of force main and water main  piping network systems, hydraulic analysis and unit operations design associated with  water and wastewater treatment plants. Mr. Cooper also has proficiency in surface  water hydraulic models, including watershed and hydraulic conductivity analysis. Mr.  Cooper has worked extensively with permitting agencies including various  municipalities, county planning, environmental and health protection departments,  Florida Department of Environmental Protection, Water Management Districts and the  Florida Department of Transportation. He also brings construction management  expertise to all projects assuring a high level of client satisfaction and quality control.  WATER AND WASTEWATER TREATMENT DESIGN EXPERIENCE  Alternative Water Supply Plan (AWS), City of Pembroke Pines, Florida.  Program  manager for this $150 million water supply program including consumptive use  permitting, hydraulic modeling, wastewater treatment plant and advanced waste  treatment basis of design and pilot plant study of aquifer injection of reclaimed water.  2­MGD Wastewater Treatment Plant Expansion, City of Pembroke Pines, Florida.   Designed additional surge tank capacity, distribution pumps, treatment units, sludge  digestion, screening and grit removal and emergency power generation. Prepared all  cost estimates, bidding assistance and complete construction management for the entire  construction phase.  4­MGD Wastewater Treatment Plant Expansion, City of Pembroke Pines, Florida.   Designed additional treatment capacity and sludge digestion. Prepared all cost  estimates, bidding assistance and complete construction management for the entire  construction phase.  Water Treatment Plant Expansion, City of Pembroke Pines, Florida.  Project  Administrator for $15,400,000 water treatment facility expansion including a 12 MGD  anion exchange system, treatment unit capacity and filtration system.  Provided staff  technical and management guidance on project start‐up and close‐out issues of this  Contractor led Design/Build project.  10­MGD Wastewater Treatment Plant Technical Feasibility Study.  Program  Manager for wastewater treatment plant preliminary design study including project  siting and basis of design for all unit processes including computer modeling of  wastewater transmission and pumping systems using WaterCad modeling software for  utilities serving 80,000 customers.  EDUCATION B.S. in Civil Engineering, University of South Florida, 1988 PROFESSIONAL REGISTRATION Professional Engineer State of Florida, No. 45840 Professional Engineer State of Tennessee, No. 110468 Professional Engineer State of Georgia, No. 034265 PROFESSIONAL ASSOCATIONS Water Reuse Association Water Environment Federation (WEF) American Society of Civil Engineers (ASCE) National Council of Examiners for Engineering and Surveying (NCEES) Chi Epsilon Civil Engineering Honor Society Page 3| 3 Jonathan N. Cooper, PE, Page 2  Golf Course Irrigation of Reclaimed Water, Hollywood, Florida.  Project Manager for reclaimed water  project team where responsibilities included storage pond design and reclaimed water transmission mains.   Planning, design, construction documents and construction management.  HOSPITAL DISTRICT DESIGN EXPERIENCE  South Broward Hospital District, Hollywood and Pembroke Pines, Florida.  Programming, planning and  civil engineering design, permitting and construction for all types of hospital expansion projects. Hospital  facilities such as emergency rooms, surgery center, fire access plans, platting, energy plants, drainage design,  potable water and fire protection. All aspects of civil engineering from concept to completion.  Joe DiMaggio Children’s Hospital, Hollywood, Florida.  Project Manager for this $165 million free‐ standing children’s hospital beginning with planning, site plan approval, traffic studies, streetscape  improvements, construction documents  and construction management.  All aspects of civil engineering  including potable water, sanitary sewer, sewer pump station, paving and drainage as well as off‐site  roadway improvements.  Memorial Hospital Miramar, Florida.  Project Manager for civil engineering design of drainage systems  associated with parking lots and pedestrian walkways including on‐site retention or discharge, water  quality treatment, environmental permitting as well as potable water and sanitary sewer services.  Jackson South Hospital Campus Expansion, Miami, Florida.  Project Manager for this hospital expansion  including site plan approval, construction documents, permitting and construction management.  All  aspects of civil engineering including potable water, sanitary sewer, paving and drainage as well as off‐site  roadway improvements.  LAND DEVELOPMENT DESIGN EXPERIENCE  Waterview/Foxcroft, Miramar, Florida.  The project is a 133 acre former golf course that is being  converted into a multi‐use development including industrial/office/warehouse, multi‐family, and single  family homes. CGA’s role includes civil engineering, area drainage analysis, planning, survey, and landscape  architecture and construction services.  The project has involved close coordination with the City of  Miramar on many issues including drainage, utilities, road improvements, platting, and variances. The  project involves many phased approvals and the granting by the City of early earthwork operations.  Radius Condominium, Hollywood, Florida.  Project Manager for this downtown re‐development multi‐ use project including multi‐family residential, commercial and parking garage.  All aspects of civil  engineering beginning with site plan approval, streetscape improvements, construction documents  and  construction management.  Civil engineering included potable water, sanitary sewer lining and  replacement, paving and drainage including drainage discharge via gravity drainage injection wells.  Pembroke Falls Residential Development Site, Pembroke Pines, Florida.  Created master plan for all  surface water, potable water and sewer systems, sewage lift station design, gravity sewer line design, water  main design and cost estimates for all work on 1500‐acre site. Development of individual parcels including  all utility design and permitting required for site development.  Hollywood Station Multi­Use Phases One, Two and Three, Hollywood, Florida.  Project Manager for  this downtown re‐development multi‐use project including work‐live units, multi‐family residential,  commercial and parking garage.  All aspects of civil engineering beginning with site plan approval,  streetscape improvements, construction documents and construction management.  Civil engineering  included potable water, sanitary sewer replacement, paving and grading. Due to site constraints, drainage  design was predicated on retention system utilizing subterranean drainage cisterns. Page 3| 4 Jonathan N. Cooper, PE, Page 3  Florida Power and Light (FPL) Sub­Station Expansions, Florida.  Project Manager for civil engineering  design of drainage systems associated with electrical sub‐station expansions including on‐site retention or  discharge, water quality treatment, environmental permitting as well as potable water and sanitary sewer  services.  Walter C. Young Middle School and Resource Center, Pembroke Pines, Florida.  Project engineer  coordinating design and layout of large public school complex with considerations for existing drainage,  water, sewer, and other utilities. Evaluated numerous concepts for most economical and efficient means to  improve level of service.  FDOT District 6, Tamiami Trail Re­Surfacing, Miami­Dade County, Florida;  Project manager for this  32 mile overlay project including milling and resurfacing as well as environmental improvements to  existing water quality pre‐treatment facilities through environ mental permitting.  WATER AND SEWER DESIGN EXPERIENCE  North Shore Improvement Program, Miami Beach.  Quality control manager for design services and  construction documents for 4,555 linear feet of water mains, service laterals, fire hydrants, milling, and  paving.  Capital Improvement Program, Town of Surfside, Florida.  Quality control manager for Implementation  of capital improvement plan, including cleaning, videotaping and restoration for the city‐wide sewer  system, replacement of potable water mains, refurbishment of sanitary sewer pump stations and  installation of pressurized drainage well systems for improved flooding level of service.  Cargo Apron for Miami International Airport, Miami, Florida.  Project Manager for this multi‐discipline  team project in creation of cargo bay expansions which required a massive relocation of the utility corridor  containing domestic water, fire demand water, force mains, electric, communications, and other critical  lines.  Page 3| 5 JOEL T. WADSWORTH, GC  Project Manager  SUMMARY OF QUALIFICATIONS   Joel Wadsworth is an accomplished strategic planner, leader, and construction/facility  management specialist with more than 25 years of experience serving an instrumental  role in the delivery of top quality, multimillion‐dollar real estate developments. He held  positions as estimator/purchasing agent, assistant superintendent, superintendent,  project manager and VP Director of Construction for Trafalgar Developers/Associates,  Inc. a subsidiary of General Electric Company. He held similar high‐level positions with  the HDC Group and International Sales Group assuming responsibilities and authority  for the budgeting, contracting and construction management of a number of complex  high‐end residential and commercial real estate developments.   PROJECT EXPERIENCE  Project Manager – Construction Services Division ­ Calvin, Giordano, & Associates,  Inc. Ft. Lauderdale, Florida:  Capital Projects Manager – City of Sunny Isles Beach, FL:   Key Construction Projects:   $14m Parking Garage & Park   $5.5m Ocean Fishing Pier   $3.5m Intracoastal Bridge  Project Manager – City of Sunny Isles Beach: Heritage Park & Garage (May 2010 –  June 2011). Project is a 380 space, cast‐in‐place concrete garage with decorative metal  panel skin and accompanied by a 3‐acre City park. The Park amenities include a  performance stage, commemorative wall and fountain, an interactive water feature with  two children’s playground areas, an observation Pavilion, an expansive lawn area and  lush landscaping. Work completed June 2011 at a cost of $14,000,000.00.  Project Manager – City of Sunny Isles Beach: Town Center Skatepark (June 2010 –  February 2011. Project is a 7500sf concrete park on a one‐acre parcel of an existing  City park. This Design‐Build project consisted of coordinating the design team and the  General Contractor to complete the cast‐in‐place complex concrete features  incorporated in the state‐of‐the‐art facility designed for world‐class skateboard  professionals. Challenges met include working a tight site with limited accessibility  while maintaining safe access to the existing facilities. Work completed on schedule in  February 2011 at a cost of $600,000.00.  Project Manager – City of Sunny Isles Beach: Newport Fishing Pier & Restaurant:  The City of Sunny Isles contracted CGA to provide engineering and government  consulting services for the Sunny Isles Beach Newport Fishing Pier project. The City  entered into a public‐private partnership to restore the Newport Fishing Pier, which  was badly damaged during Hurricane Wilma in 2005. The Pier, which is the last  remaining public pier in Miami‐Dade County, was built in 1936.The 800’ pier was  designated as a historic site in 1982. The project involves project management services  throughout the permitting, demolition and reconstruction phases of the project as well  as Prime consultant duties involving the retention and management of Special  Inspectors, Geotechnical Engineer of Record and Materials Testing Services. The project  is set to be permitted by late October 2011 and will include a 105‐seat restaurant, 2nd  story lifeguard office and fishing stations. The project is scheduled to commence  construction in November 2011 with a completion date of June 2012.  EDUCATION Bachelor of Arts in Building Construction, University of Florida, Gainesville, Florida CERTIFICATIONS Certified General Contractor (Active License) #CGC009211 Page 3| 6 Joel T. Wadsworth, GC, Page 2  Director of Development and Construction Division: International Sales Group LLC, Aventura,  Florida. Organization specializing in real estate sales/marketing within territory covering the US and the  Caribbean. Provider of consulting services in the areas of project concept, feasibility, related market  studies, and cost analysis.  Company generates from $200M to over $500M sales annually and is comprised  of 25‐200 staff members.  Work collaboratively with clients in the planning of real estate development projects, offering expertise in  the areas of concept, markets, feasibility, constructability, and expense/cost forecasts. Deliver expert  management of construction ventures, serving as client representative focused on the ensuring of the  effective, timely, and quality orchestration of all project phases in compliance with requirements.  Key Construction Projects:   Residential and commercial project (1,800 units) on 14 acres in the City of New Orleans   $3M custom, luxury home in the City of Fort Lauderdale  Director of Construction: HDC Group LLC, Miami, Florida.  Leading corporate representative securing  key accounts and delivering expert consulting in the areas of research, documentation, and project  planning/development.  Served as Construction Manager and Owner’s Representative.   Key Construction Projects:   MEI Condominium, a high‐rise luxury condominium development in Miami Beach   Aventura Marina Condominium in Aventura, Florida   Custom homes in Pinecrest and Coral Gables, Fl.  Office / warehouse in Miami, Florida   Commercial alteration in Aventura, Florida  Director of Construction, Trafalgar Associates Inc., Miami, Florida. Primary leadership and supervisory  force in the areas of land development and construction of apartments, single‐family homes,  condominiums, and commercial structures.  Secured government approval/permits, planned and  monitored site development, controlled budgets, scheduled work, hired contractors, coordinated  construction phases, and ensured the safe/timely/cost effective/quality completion of all projects.  Liaised,  worked closely with, and managed attorneys, architects, engineers, government representatives,  subcontractors, sales managers, superintendents, foremen, labors, purchasing specialist, bookkeepers and  customer service representatives.  Key Construction Projects:   Sheridan Lake Club Apartments (144‐unit complex) Dania Beach, Florida.   Aventura Lakes (419‐unit, 75‐acre single‐family planned development) in Aventura, Florida   85,000 square‐foot office/warehouse and tenant build‐out in Miami, Florida   Ventura – 500 acre golf‐course, condominium, apartment and single‐family project Orlando, Florida   Isla Del Sol – 3800 unit resort golf course/marina condominium development in St. Petersburg, Florida  Page 3| 7 CHRIS GIORDANO, SMC  Assistant Project Manager  SUMMARY OF QUALIFICATIONS   Chris Giordano has a total of 8 years construction management experience.  After  graduating from the University of Central Florida with a Bachelor of Science in Electrical  Engineering Technology, he pursued a career in the construction management industry.   Chris held the positions of Project Administrator, Project Manager, Contracts Manager,  and finally Project Controls Manager for the Orion Marine Group before deciding to  leave the marine industry to pursue other avenues.  He was then appointed the position  of Project Administrator at Calvin, Giordano & Associates and is currently the Project  Manager for the Town of Surfside Community & Aquatic Center Construction.  Throughout his career, Chris managed hundreds of millions of dollars in construction.   The clients for these projects ranged from federal, state, local and private clients.  Chris  gained construction experience throughout the southeastern United States as well as in  the Caribbean.   PROJECT EXPERIENCE  Project Administrator – Governmental Services. Calvin, Giordano, & Associates,  Inc. Ft Lauderdale, FL   Coordinate and Assist in the Management of all Government Contracts   Manage the Production of Bid Documents, Responses to RFI’s, and Bidding Process   Recommend Award of Contracts to City Commission   Manage the Contractor’s Submittals, Payment Applications, Claims, Change Orders,  Etc   Ensure Contractors are Maintaining Current Schedule and Budget Goals  Projects Managed:   Town of Surfside Utility Rehabilitation Project   Sunny Isles Beach Newport Pier Demolition and Reconstruction   Sunny Isles Beach North Bay Road Bridge Permitting & Construction   Sunny Iles Beach CIP Program Management   Town of Surfside Community & Aquatic Center Construction   Port Sutton & Jupiter Manatee Observation  PROJECT CONTROLS MANAGER & CHIEF ESTIMATOR  Orion Dredging Services, LLC, Jacksonville, FL. (2008 – 2009)   Create and Present all PSR & PCSR Reports for Division, Primavera Progress  Schedules, Cost and Revenue Forecasts, and Direct Cost and Schedule Support to  Project Managers   Perform all Bid Estimates for Federal, State, Local, Private and International Projects   Forecast Every Project on a Monthly Basis and Present Findings in Monthly PCSR  Meetings   Managed Multiple Public Works Contracts Concurrent with PCM & Estimating  Duties EDUCATION BSEET, Electrical Engineering Technology, Concentration on Computer Systems. University of Central Florida, Orlando, FL. 2005 PROFESSIONAL REGISTRATION Florida Specialty Marine Contractor No. SCC131151012 Page 3| 8 Chris Giordano, SMC, Page 2  Projects Managed:   Waterside Improvements, Labadee, Haiti   USACE Blount Island Emergency Dredging   TPA FY 08 Maintenance Dredging  Contract Manager / IT Director; Subaqueous Services, Inc., Orlando, FL. (2005 – 2008)   Managed Office Staff of Ten Employees   Maintained all Correspondence with Owners/Engineers   Managed $44 Million In Annual Contract Backlog   Created and Attended all Presentations for Governments, Citizens, Conferences and Private Firms   Created Project Tracking Databases   Maintained LAN with 15 Workstations 10 Remote Laptops and 2 Servers  Projects Managed:   Volusia County Emergency Dune Restoration   Tampa Port Authority Hookers Point Expansion   Jaxport Dames Point Expansion‐Project One   SFWMD Lake Trafford Restoration‐Phase II   FIND MSA 434/434C DMMA Construction   Island Pointe Marina Dredging   Bayou Grande Villas Maintenance Dredging   Port Everglades Maintenance Dredging   Panama City Marina and Homeowner Canal Dredging   Peace River Hurricane Debris Cleanup   FP&L Hurricane Debris Cleanup   Hendry County Oxbow Dredging   SFWMD S‐65A Rock Rip Rap Bank Restoration  Marketing Director / IT Director, Subaqueous Services, Inc., Orlando, FL. (2001 – 2002)   Prepared Official Bid Packages   Updated & Maintained Access Databases   Tracked Market Leads   Created Marketing Letters to Homeowners & Clients   Maintained LAN with 10 Workstations and 1 Server  Engineering Inspector Intern, GLC Construction, Hallandale, FL. (1999 – 2001)   Air Tested Concrete   Slump Tested Concrete   Inspected Pollution Retard Baffles   Inspected Mud Work on Drainage Structures  Page 3| 9 KARL KENNEDY, PE  Municipal Engineering Support Services  SUMMARY OF QUALIFICATIONS   Mr. Kennedy has 26 years of experience in civil and environmental engineering with  specialization in utilities infrastructure design. He has experience in the design of civil  engineering projects including neighborhood improvement projects, paving and  drainage projects, water and wastewater treatment plant processes, water mains, and  wastewater transmission main projects. Mr. Kennedy is familiar with the design/build  process. Mr. Kennedy has worked extensively with permitting agencies including  various municipalities, county planning, environmental and health protection  departments, the Florida Department of Environmental Protection, and the U.S.  Environmental Protection Agency. He also has considerable construction management  experience.  PROJECT EXPERIENCE  Vice­President of Engineering.  As Vice‐president of Engineering he is responsible for  all actions within the Engineering Department as well as with coordination with other  departments within the company including surveying, planning, landscape architecture,  and construction administration.   He participates in both internal and external project  progress meetings and is instrumental in assuring the projects complete the quality  assurance process.    Associate/Director of Engineering.  He directed the operations of a 25 person  engineering department with the following divisions: Civil/Municipal Engineering, Land  Development, Electrical and Utilities Engineering.  He is involved in preparation of  proposals, assigning personnel and setting up project teams.  He assists in technical  specification writing, contract document preparation and cost estimating.    Division Director. Responsible for the overall supervision of department workloads,  staff, budgets, proposals, contracts, billings, project schedules, quality control and  construction inspections.  Project Manager.  His duties included coordination with engineers on the project team  and the CADD Department as well as overall Project Management and Cost Accounting  for tracking the progress of projects, change orders, work orders, and additional  services agreements.  In addition, he interfaced with contractors, clients, and permitting  agencies from application to final certification.  He has designed, permitted, and  managed projects and studies for water and wastewater facilities, pumping systems,  control structures, pipelines, and wet wells.  Project Engineer.  Responsibilities included utility projects and land development  projects from client contact to determine project scope, proposal preparation, project  design, permitting, bidding, construction management through to final certification or  certificate of occupancy.  He was directly responsible for coordination of mechanical,  electrical, plumbing, structural, and civil engineering design.   Provided management of  commercial, industrial, highways, utilities, residential, and public works projects  involving design and permitting through various governmental agencies in Miami‐Dade,  Broward, and Palm Beach Counties.    EDUCATION M.S., Chemical Engineering, West Virginia University, Morgantown, WV, 1984 B.S., Chemical Engineering, West Virginia University, Morgantown, WV, 1981 PROFESSIONAL REGISTRATION Professional Engineer State of Florida, No. 48838 Certified Quality Engineer American Society for Quality (ASQ) PROFESSIONAL ASSOCATIONS American Water Works Association (AWWA) (past State of Florida Training Chair) Water Environment Federation (WEF) American Society for Quality (ASQ) American Institute of Chemical Engineers (AICHE) Page 3| 10 Karl Kennedy, PE, Page 2  SPECIFIC PROJECT EXPERIENCE   Preparation of the design criteria package for engineering and landscape architectural improvements  for the proposed $8.0 mil Public Services Campus. The CGA Team designed the complex to have 85,000  square feet under roof, including a City fueling station, and will be designed to GBC LEED “silver”  standards. This includes design criteria for water, sewer, roadways, parking lots, drainage, hardscape,  landscape, and irrigation. The project is being bid as a design/build project with the 30% plans and  criteria package.  In addition, the overall City site includes approximately 30 acres of wetland  mitigation as part of a permit issued by SFWMD, Broward County, and the Army Corps of Engineers to  compensate for disturbed wetlands.  In addition the upgrading of perimeter canals are being done.   Prepared the design criteria package for a new water and wastewater treatment plant ($120.0 mil).   Project consisted of facility siting, capacity requirement determination and preparation of Design  Criteria package. Project acquired using the 2‐stage engineer lead Design‐Build method of delivery.   The CGA Team assisted the municipality with reviewing qualification of design/builders, assistance  with award.  The CGA Team was chosen to act as the as the Owner’s Engineering Representative during  construction.       Designed and coordinated construction of a $15.4 mil water treatment facility expansion. This project  included a 12 MGD anion exchange system for color removal, 12 MGD of treatment unit capacity and 12  MGD filtration system capacity.  Final permitted facility capacity was 16 MGD with 4 MGD of redundant  treatment and filtration capacity. Was Engineer of Record and carried out all project management  functions including coordination of project meetings, shop drawing reviews, inspections and approval  of payment requests. Project was completed as a Contractor led Design/Build project.   Designed and coordinated construction of a $14.2 mil wastewater treatment facility expansion. This  Design/Build project included a permitted system capacity increase from 10.1 to 12.6 MGD (TMADF)  with the addition of a 5th concrete Aeration Basin (approx 250’ x 28’) containing eight (8) cells, a 4th  100 ft diameter Secondary Clarifier, a 3rd 8000 gpm Injection Well Pump with appurtenances, RAS  pumping system piping modifications, Upsizing of two (2) 200 HP Aeration Blowers to 500 HP each, the  addition of a 5th 500 HP Aeration Blower, and conversion of four (4) existing Aeration cells and One (1)  new Basin cell to Anoxic operation. Additional improvements include replacement/modernization of  the existing Plant‐Wide SCADA system.  Was Engineer of Record and carried out all project  management functions   Coordinated design of modifying an existing WWTP for aquifer recharge and reuse to gain CUP credits  and meet existing WWTP permit requirements.  Prepared a Pilot Study Protocol and Performance  Study.  The Pilot Plant study of new treatment equipment included: Pilot plant and study design,  Approval of Study by Florida Department of Environmental Protection (DEP), Pilot plant study (6  months operation) including analytical testing.  In addition, he supervised Treatment Plant Design and  preparation of Design Build Documents. The Basis of design report (BODR) included: preparation of  construction cost estimate, process design of new equipment, sizing of new equipment and piping, and  siting of equipment.   Prepared a Neighborhood Improvement Plan for the Bonaventure area of the City of Weston which  encompassed an area of 7.8 square mile.  Some of the major items included landscaping/irrigation,  roadway improvements and drainage improvements.   Prepared the design criteria package for an ion exchange system and was owner’s representative  during construction( $1.5 mil)   Prepare the design criteria package for an on‐site sodium hypochlorite generation system and was  owner’s representative during construction. ($5.0 mil)   Prepared consumptive water use permit applications, including the preparation of the reuse feasibility  study, long‐term water supply plan, water conservation plan and coordination of hydrogeological  modeling services.  Page 3| 11 Karl Kennedy, PE, Page 3   Prepared rate studies for the Utilities in order to estimate the revenue requirements to ensure that  each utility will operate on a financially self‐sufficient basis.  The studies included collecting, reviewing  and evaluating historical and current financial records, operation and maintenance reports, forecasting  customer growth, water consumption and wastewater for each customer class, reviewing capital  improvement programs.  Reports were prepared for these studies.  This technical report included the  data and tabular displays of the analysis listed above.  The reports were presented to the City  Commissions along with conclusions and recommendations at public meetings on this rate study.   Prepared a Utilities master Plan to examine the existing utility system within the Tow of Davie’s utility  service area.  Estimates of the projected water and sewer needs were made.  The physical condition of  the Town’s infrastructure was examined.  Modeling of entire water and sewage transmission system  was performed.  WaterCad was software used.  Recommendations for improvements to the existing  infrastructure were made as well as recommendations for new infrastructure.  The following items  were examined: Drinking Water, Pumping and Distribution System, Storage Tanks, Water Supply,  Water Treatment Facilities, Wastewater Collection System, Wastewater Transmission Piping, Pumping  System, Wastewater Treatment Facilities   Coordinated design of two High Density Polyethylene (HDPE) pipe Horizontal Directional Drills for the  City of Dania Beach under two different SFWMD canals.  One crossing was under the Dania Cut Canal  and the other under the C‐10 canal.  The scope of the project included 1,000 L.F. (Linear Feet) of new  12” W.M. HDPE pipe, tie‐ins and hot taps to existing water mains, water service connections, and the  removal of existing pipe.  The project was conducted on an expedited schedule to meet key deadline set  by FDOT utility relocation schedule.   Sewage Pumping Station Design – Directed the design of new and replacement pumping stations using  both dry pit pump designs and submersible pump designs from 2.5 Hp to 175 Hp pumps.  Designs  included new concrete valve vaults, discharge piping, new concrete pads, fencing and landscape. The  existing wet wells and receiving manhole were structurally rehabilitated. Stations included electrical  control panels as well as some received separate emergency back‐up generators.   Can Pump Station Conversions – Directed the design of many replacement of existing pumps in the  adjacent dry well with new submersible, non‐clog pumps in the wet well.  The wet wells are generally  rehabilitated to prevent infiltration unless the wet well is not of sufficient capacity and then the wet  well is converted to the terminal manhole and a new wet well is designed adjacent to the existing  structure.  The stations are bypassed during construction, which also included installation of new  submersible pumps, emergency electrical connections and site landscaping.   Performed computer modeling of water distribution and wastewater transmission systems using  WaterCad modeling software for utilities serving from 35,000 to 165,000 customers.   Contract City Engineer for six years for a city with a population of over 65,000.  Responsible for all  capital improvement projects including water, sewer, drainage, paving, landscaping and traffic projects.   Projects included new stormwater pumping stations, roadway widening with additional travel lanes,  bike lanes and bus shelters, installation of traffic signals, installation of round‐a‐bouts, construction of  new parks and upgrades to existing parks, construction of a new city hall, construction of a public  works complex with fueling station, installation of SCADA on all pumping stations. Duties include  issuance of engineering permits, coordination of inspection associated with those permits, review of  site plans, attendance at staff meetings and all City Commission meetings.    Prepared Engineering Standards for two municipalities.   Managed the Manatee Isles Drive Improvements project. This is two lane divided roadway, with turn  lanes, in a residential area, connecting several neighborhoods to an elementary school on the east end  and Florida Nature and Cultural Center on the west end. This project included added bicycle lanes,  sidewalk, LED street lighting, drainage improvements, curb and gutter and improved school zone  markings at the Elementary School.  Construction management services we also performed.  Page 3| 12 Karl Kennedy, PE, Page 4   Designed water, sewer, roadway and drainage facilities for a 1,500 acre housing development including  gravity sewer system, water and wastewater transmission mains.  Project also included preparation of  the utility master plan, design of utilities including the sewage pumping stations and cost estimates for  all utility work.   Design of the 26‐acre Spring Valley Park including parking lot areas, four inline hockey rinks.  Also  included is the design of the water, sewer, paving, and drainage improvements associated with the  construction of a concession building with bathrooms. The work included site lighting, landscaping and  irrigation, and drainage modifications and a nature preserve.  Page 3| 13   ROBERT F. MCSWEENEY, PE  Municipal Engineering Support Services  SUMMARY OF QUALIFICATIONS   Mr. McSweeney has more than 24 years of experience in land development, utilities,  roadway engineering and construction. Work knowledge includes company  representation, marketing, and civil engineering related planning, permitting, design  and construction administration.  Broad background entails employment with civil and  environmental engineering firms providing service to both public and private sector  clients in Miami‐Dade, Broward and Palm Beach Counties.  Experience also involves  FDOT Utility Coordination, FDOT Construction Administration and design/consulting for  the U.S. Air Force.  PROJECT EXPERIENCE  City of Pompano Beach Miscellaneous Engineering Services Contract:  (2007‐ 2010)  Contract Manager/Engineer of Record for an ongoing continuing services contract  providing General Engineering, and Surveying and Mapping services to the municipality  on an as needed basis. Projects provided under this contract included: Pompano  Reclaimed/Reuse Water Main, and Force Main design and construction administration,  Pompano Beach Sidewalk Construction Program, Facility Assessment Reporting,  Municipal Pier renovation inspections, Broward County/Pompano Beach Branch Library  site engineering design, and bridge and culvert improvements.  Hillsboro Blvd. (S.R.810) Improvements: Deerfield Beach, Florida, (2007‐2010)  Engineer of Record/Contract Administrator, project included surveying and engineering  design for reconstruction and improvements to approx. 4,800 linear feet of roadway  (Hillsboro Boulevard/S.R. 810) from Federal Highway to S.R. A‐1‐A. Project  improvements include: roadway cross‐slope correction, underground utilities  adjustments/relocations, drainage improvements, mast arm/signalization, utility  coordination, safety improvements, landscape and streetscape elements, decorative  lighting and bid assistance. Construction commenced in 2008; project budget $6.5  million.  Coconut Creek High School: (2007­2009): This stadium enhancement contract  included all civil engineering and land surveying services for the school’s stadium  redesign project facilitated through a City of Coconut Creek contract with a design/build  firm, Recreational Design and Construction (RDC), and was funded by the School Board  of Broward County. Project involvement included complete civil engineering design and  permitting associated with the new stadium and concession/restroom building, and  construction administration/inspection/certification. Project was on an accelerated  Design Build schedule.  Other Broward County school stadium projects included  Deerfield Beach High School and Blanche Ely High School.   Parkland Commons Commercial Development: City of Parkland, Florida: (2007‐ 2009) Engineering Manager for the complete engineering design, platting, permitting  and construction administration for a 40‐acre commercial development. Project also  involved substantial offsite roadway improvements on University Drive, and joint use  agreements with the School Board of Broward County.  EDUCATION Bachelor of Science, Civil Engineering, 1986 Florida Institute of Technology, Melbourne, FL REGISTRATIONS State of Florida PE #47506 CERTIFICATIONS Maintenance of Traffic (M.O.T.) - Intermediate FDOT QC Manager FDOT EEO, DBE and Payroll Compliance on Local Area Projects Building Code Administrative Core PROFESSIONAL AFFILIATIONS Florida Engineering Society (F.E.S.) FAU Civil Engineering Department Advisory Board Page 3| 14   Robert F. McSweeney, Page 2  Port Everglades Cruise Terminal 4:  Engineering design and permitting of a parking lot expansion  program including resolution of existing drainage inadequacies and overall site utility redesign. The utility  improvements design included upgrading the existing stormwater management system and complete  water distribution systems, in addition to the redesign/reconfiguration of the overall parking area.  Downtown Davie: Davie, Florida: Contract Manager/Engineer of Record for the engineering design,  permitting and construction administration for a 12 acre, light density, mixed‐use (residential, retail and  office development) project in the Town of Davie. Project included legal depositions and expert witness  testimony towards resolving drainage issues with adjoining property(s).  Golden Acres Apartments, Pompano Beach, Florida: Contract Manager/Engineer of Record for this  affordable housing project with 302 units completed in two phases, Golden Square (182 units) and Golden  Villas (120 units). Project tasks included preparation and processing of the site plan, platting, surveying,  design and permitting of the water, sewer and drainage systems, roadway design and permitting, utility  coordination, and construction administration services.   Elementary School “A” (Sunrise, FL), School Board of Broward County: Engineer of Record for this new  960 student elementary school encompassing design through construction. Complete civil engineering  design, permitting, construction inspections and administration services were provided/performed. The  improvements included complete site development, paving/ grading/drainage systems, potable  water/sanitary sewer systems, and pavement marking and signage.  A second school, Elementary School  “Z” in the City of Parkland using the same prototype building plan, was designed/constructed concurrently  with this project.    Tri­Rail Double Tracking Corridor Improvements: Engineer of Record/Utility Construction Manager for  a portion of this large scale project involving planning, permitting, and engineering for the expansion of  multiple stations and supporting infrastructure in the tri‐county area. The pertaining project  improvements included new/reconfigured station parking lots and associated stormwater management  systems; utility infrastructure improvements including modifications and new facilities for both water  distribution and sanitary sewer systems; drainage system modifications and connections including large  scale box culvert construction observation, utility, drainage and roadway improvements. The project was a  fast‐track Design/Build initiative that involved numerous governmental agencies, municipalities, utility  companies (both public and private) and drainage districts.    City of Deerfield Beach Miscellaneous Engineering/Surveying Services Contract: (2007‐2008)  Contract Manager/Engineer of Record of an ongoing continuing services contract providing as needed  General Engineering and Surveying and Mapping services to the municipality on an as needed basis.  Projects provided under the contract included:   A‐1‐A “S‐Curve” Beach Roadway and Beautification Redevelopment   Intersection improvement design of Goolsby and Hillsboro Boulevards   Intersection improvement design of Century and Hillsboro Boulevards  Broward Boulevard Bridge Improvements: Plantation, FL, (2003), East of West Tropical Trail to East of  University Drive: Senior Project Administrator for the replacement of two bridges connecting to Broward  Boulevard with aluminum arch culverts (Con‐Span) including bridge demolition, drainage modifications,  intersection and roadway modifications, milling and resurfacing, signalization modifications, roadway  lighting, landscaping and irrigation, and pavement markings and signage.  Page 3| 15   Robert F. McSweeney, Page 3  Wiles Road Extension: Broward County, FL, (2002), West of Lyons Road to West of Florida's Turnpike:  Senior Project Administrator for the roadway extension of a multi‐lane divided section including drainage,  utility installations (water main, gravity sewer, force main and lift station modifications), signalization  modifications, roadway lighting, landscaping and irrigation, and pavement markings and signage.  N.W. 12th Street: Miami‐Dade County, FL, (2000‐2002), West of N.W. 107th Avenue to East of N.W. 136th  Avenue: Senior Project Administrator for the roadway construction and/or widening of a multi‐lane  divided section including bulkhead/seawall installation, culvert(s) extensions, roadway foundation  stabilization (geo‐textile installation), concrete barrier wall installation, drainage, utility installations  (water main and force main), railroad crossing modification, signalization, roadway lighting, landscaping  and irrigation, and pavement markings and signage.   S.R. 7 (U.S. 441); Broward County, FL, (2003‐2004), South of Griffin Road to South of Stirling Road:  Senior  Project Administrator for the roadway reconstruction and widening of a multi‐lane divided section  including drainage modifications/retention area construction, signalization, roadway lighting, landscaping  and irrigation, and pavement markings and signage.  N.W. 12th Street/HEFT Interchange: Miami‐Dade County, FL, (2000‐2001), connection with the  Homestead Extension of Florida's Turnpike (HEFT): Senior Project Administrator for the intersection  connection of the mainline HEFT to N.W. 12th Street (excluding toll booth buildings) including ramp  connections, two (2) flat slab bridges crossing Snapper Creek Canal, drainage improvements (including  lake construction), concrete barrier wall, utility installations (water main, force main including aerial  crossings, and lift stations), signalization, roadway lighting, landscaping and irrigation, and pavement  markings and signage.  Palmetto Expressway (S.R. 826/N.W. 167th Street): Miami‐Dade County, FL, (2000‐2001), North of N.W.  154th Street to West of the Golden Glades Intersection: FDOT Senior Project Administrator for the milling  and resurfacing of the mainline, ramps and adjacent frontage roads (N.W. 167th Street) and intersections  for three (3) concurrent/adjoining FDOT projects.  The work involved included milling and resurfacing,  concrete barrier wall modifications, signalization improvements/modifications, roadway lighting,  overhead signage installation(s), pavement markings and signage, landscaping, bridge deck cleaning, and  utility adjustments.    N.W. 40th Street: Coconut Creek, FL, (2006‐2007), West of N. W. 54th Avenue to East of State Road 7 (U.S.  441): Construction Administrator for the roadway widening and modifications of a divided section  including drainage modifications/improvements, intersection modifications, utility installations (water  main and sewer services), landscaping and irrigation, and pavement markings and signage.  Page 3| 16 RODERICK MYRICK, PE, GC  Construction Program Management  SUMMARY OF QUALIFICATIONS   Mr. Myrick has 15+ years of transportation design‐build, construction and emergency  response management experience in varying roles, his latest as responsible for business  development and the management of a construction engineering and inspection  division.  He has demonstrated his diverse skills in several areas and is willing to make  the tough management or technical decisions that are in the best interest of the client  and his firm. Mr. Myrick has excellent communication and technical skills and will add  immeasurable value to any project or team.   PROJECT EXPERIENCE  Project Engineer­ SR 90, US 41 Milling and Resurfacing, (12/2010 – 8/2011): The  project scope includes millings and resurfacing of a 4 mile stretch of US 41 in Collier  County. This is a rural construction project which includes bridge traffic railing  modifications, shoulder rework, asphalt, signalization, signing and pavement markings  and guardrail retrofits.  Roderick is currently managing 3 project concurrently on this  assigned, an additional mill and resurface project and a design build urban ADA  compliance project in the City of Naples.  Reference: Eunice Usher, P.E. FMOC Operations  In‐House Construction Manager, (239) 656‐7800   Senior Project Engineer­ SR 5, US 1 Milling and Resurfacing, (11/2009 – 3/2010):   The project scope includes millings and resurfacing of a 2 mile stretch of US 1 in Palm  Beach County. This is an urban construction project which includes minor widening,  pavement repairs, drainage and pipe lining, signalization, signing and pavement  markings and landscaping improvement. Reference: Jacques Beaubrun – WPB  Operations Construction Manager, (561) 719‐7912   Senior Project Engineer­ City of West Palm Beach, 24th and 25th Street, Streetscape  Milling and Resurfacing, (11/2009 – 3/2010) The project scope includes millings and  resurfacing, watermain installation, lighting and decorative streetscapes on this  Federally funded Local Agency Participation project.  This is an urban construction  project which included major public involvement and coordination with the Department  of Transportation.  Reference: Brian Collins, PE 561.494.1040 Ext 2  Senior Project Engineer­ SR 7, US 441 Reconstruction, (8/2008 – 3/2010). The  project scope includes total reconstruction of the SR 7 corridor. This is a 25M urban  construction project which includes widening, milling and resurfacing, drainage, large  retention facilities, lighting, signalization and landscaping improvement. Reference:  Hassan Abedi, FTL Operations Construction Manager, (954) 958‐7632   Senior Project Engineer­ SR 15, US 441 Reconstruction, (12/2004 – 08/2007). The  scope of this project included the reconstruction of the S‐curve located along the SR 15  corridor in the City of Pahokee. Major items of work included: Community awareness  initiatives for complete roadway closures; subsoil excavation; Geo‐synthetic soil  reinforcement (geo‐grid); ARMI layer installation for the milling and resurfacing  sections; major culvert replacements and rip‐rap installations in conjunction with AB  Mattress operations. Reference: Deb Ihsan, WPB Construction Operations Manager  (561) 432‐4966  EDUCATION B.S. Civil Engineering, University of Florida, 1996 REGISTRATIONS Florida Professional Engineer License No.: 56969 Florida Certified General Contractor License No. 1511653 TRAINING AND CERTIFICATIONS: TIN: M620725711660 Asphalt Paving Level 1 Earthwork Level 1 Earthwork Level 2 Nuclear Surface Moisture Density Certification QC Manager IMSA - WZTC Safety Program Advance MOT WZTC Level 2 – Traffic Safety in the Work Zone Erosion Control and Stormwater Management Page 3| 17 Roderick Myrick, PE, Page 2  Senior Project Engineer­ Palm Beach County Signalization and Debris Management Coordinator,  (10/2005 – 02/2006). Mr. Myrick’s duties included coordination with local jurisdictions for signalization,  debris collection and damage assessment coordination. He was responsible for the oversight and contract  administration for signalized intersections restoration efforts in Broward and Palm Beach Counties. Mr.  Myrick affectively managed signal restoration with 14 various signal contractors within the State of Florida.  He served as the liaison between all maintaining agencies, various contractors, field personnel, local  municipalities and other stakeholders affected by the Hurricanes that impacted this region. Mr. Myrick  successfully completed all signal and debris restorations within the 180 day time frame for FHWA and  FEMA contracts Reference: Deb Ihsan, WPB Construction Operations Manager (561) 432­4966  Page 3| 18 GEORGE GUERRERO, GC  Construction Program Management   PROJECT EXPERIENCE:  City of Sunny Isles Beach Project # 31­2214­000­0045;  Newport Fishing Pier and  Restaurant Construction, Sr. Inspector, Responsible The coordination for the pile  driving and vibration monitoring Inspectors, reviewing and monitoring the construction  documentation, ensure compliance with the contract documents and specifications.   Scope of work for this project is the removal of the existing pier wood structure, deck  and columns and construction, in the same footprint, of a new double Tee concrete deck  over 24” pre stress concrete piles pier.  Towards the East side of the pier a new  restaurant will also be constructed. New electrical distribution system and transformer  along with adjacent areas restoration will be included. Project Started: March 2012,  Project Completed:  Current    FDOT Project # FM 423810­1­58­01; West Palm Beach (LAP) Seaboard Train  Beautification Project. Reference: COWPB, Project Manager; Jeffrey E. Halverson  (561) 494‐1092. Sr. Inspector, Responsible The coordination for the material testing  with VT Inspectors, reviewing and monitoring the construction documentation, ensure  compliance with the contract documents and specifications.  Scope of work for this  project is pedestrian and landscape improvements to the Seaboard Train Station site,  including construction of a pedestrian plaza with landscaping elements, irrigation and  lighting on the area immediately east of the existing Seaboard Train Station building,  reconfiguration and landscape improvements to the surface parking lots on the north  and south of the building, and some pedestrian improvements along the Tamarind  Avenue right‐of‐way between Clematis Street and Fern Street. Project Started March  2012, Project Completed:  Current   I595 Express Corridor Improvement ($1.25 B) P3 Project. Alejandro Montenegro  P.E:  CES Consulting and Testing, Inc. Mr. Guerrero was working on this project in all (6)  six segments A, B, C, D, E and the east and west greenways. His responsibilities included;  quality assurance and collection, sampling and storage of concrete samples as required,  also conducted liquid properties testing as required by FDOT.  Project Started: October  2010, Project Completed: Current  MDX GEC Contract. Yan Chang P.E.: EAC Consulting Engineers, Inc. Senior Construction  Inspector­Supervised the construction/repair of concrete bridges and roadway  improvement work for the Miami Dade Expressway Authority. Inspected structures to  determine structural soundness and compliance with specifications, building codes, and  other regulations. Responsible for contract compliance and documentation,  communication with the contractor regarding work quality, field adjustments and non‐ compliance work. Project Started: January 2008, Project Completed: July 2010.   FDOT District 6 CEI Consultant Residency. John Hart P.E.:  Carnahan, Proctor & Cross  Consulting Engineers, Inc. Senior Roadway Inspector‐ District CEI Residency, projects  involve managing portion of the District construction work program, administering  projects from pre‐construction and plans review phases to certification of final estimate  package. Provided inspection, testing, and reporting of multiple operations including  bridge rehabilitation, concrete pavement slab re‐placement and grinding, asphalt  paving, stripping, street signalization and lighting work. Project Started: December  2004, Project Completed: January 2008  EDUCATION University of Puerto Rico, San Juan, Puerto Rico, School of Civil Engineering 1990 Magna Cum Laude REGISTRATIONS General Contractor Lic. #213100 CERTIFICATIONS TIN# G660300633340; CTQP Earthwork Construction Level 1 and 2 , CTQP Asphalt Paving Level 1 and 2, Concrete Specification Level 1 CTQP Pile Driving, ACI Field Technician Level 1, Primavera Scheduling Program Certified, MOT – Intermediate Page 3| 19 George Guerrero, Page 2  US­1 from Cutler Ridge to SW 264 St. Enrique Zuniga P.E.:  Pistorino and Alam Consulting Engineers,  Inc. Senior Roadway/Bridge Inspector‐Supervise the construction of road US‐1 from Cutler Ridge to SW  264 St.  Duties include review and interpretation of plans, blueprints, specifications, and construction  methods to ensure compliance to legal requirements. Measured dimensions and verified level, alignments,  and elevation of structures to ensure compliance to building plans and codes. Project Started: January  2004, Project Completed: December 2004  I­75 NB Ramp (at 826 NB) Widening. Eduardo Rodriguez P.E.: Parsons Brinckerhoff Construction  Services, Inc. Roadway Inspector/ Project Engineer ­ Supervised the construction of concrete noise walls,  concrete traffic railing, I‐75 NB Ramp (at 826 NB) widening and post tensioning retrofit, MSE panels and  drainage installation.  Duties included field inspection, monitor work progress and quality, daily  communication with the contractor regarding field adjustment and compliance with Technical  Specifications. Project Started: September 2001, Project Completed: January 2004  Orlando­Orange County Expressway Authority,  State Road 429, Toll Plaza & Administration  Buildings, William Griffith P.E.: C.A.P. Engineering Consultants, Inc. Project Engineer ‐ Supervised the  construction of a 12.5 miles of State Road 429, toll plaza and administration buildings for the Orlando‐ Orange County Expressway Authority. Also involved in the construction of aircraft rated bridges, concrete  box culvert, communications building and infrastructure projects for the Orlando International Airport  Authority.  Project Started: January 1997. Project Completed: September 2001  Construction Residential and Commercial Buildings.  Diego Saez P.A.: Diego Saez, P.E. Architect &  Developers. Project Engineer ‐Managed construction of residential and commercial buildings.  Responsible  for the timely and budgeted construction of projects.  Monitored program cost activity to achieve an “in  budget” result.  Prepared quotations utilizing supplier information, cost standards  and technical  information.  Maintained change request log and control changes.  Supervised and managed subcontractors  to ensure quality of work. Project Started: June 199,  Project Completed: December  1996   Residential and Commercial Structural Steel Fabrication.  Howard Bentle: Central Fabricators, Inc.  Project Engineer‐ Managed the fabrication and erection of structural steel commercial projects. Assisted  senior management in project personnel and project administration.  Responsible for the timely and  budgeted execution or work.  Assist project engineer on material expediting.  Conduct estimate and wage  review with superintendent. Project Started: June 1990, Project Completed: February 1992  Page 3| 20 ROBERT JACKSON, PSM  Survey Support Services  SUMMARY OF QUALIFICATIONS   Mr. Jackson has 44 years of experience in all phases of land surveying including  boundary, coastal control, hydrographic, route surveys, topographic, and as‐built  surveys, sketch and descriptions, legal descriptions, record plats and, boundary  descriptions for annexations and de‐annexations for municipalities. Mr. Jackson’s  current position as Director of the Surveying and Mapping Department at CCGA puts  him in the role of the main point of contact for all of our municipal clients. As a result, he  is personally involved in every municipal project from route surveys, hydrographic  surveys, boundary/topo surveys, construction layout and as‐built surveys, GPS surveys  and 3d Laser scanning.  Prior to CGA, Mr. Jackson worked for the Florida Department of Transportation as a  rodman, instrument man, and party chief. His last position there was in the Right‐of‐ Way (R/W) Engineering Department Calculation Section, where he prepared R/W maps.  PROJECT EXPERIENCE  Diplomat Hotel, Hollywood, Florida. Prepared coastal control surveys for the 38‐story  Diplomat Hotel in accordance with 61G17‐6 and 62B‐33.09 of the Florida  Administrative Code. Consultant for compliance with FEMA requirements; provided  exhibits and elevation certificates that reflected compliance with FEMA.  City of Weston, Florida. Serves as the FEMA Administrator as a function of a multi‐ service, multi‐year contract that CGA has with the City. In 1996, Mr. Jackson developed a  close working relationship with Ms. Susan Wilson, CFM, Chief, Floodplain Management  and Insurance Branch Division DHS/FEMA Region IV in having the City accepted into the  National Flood Insurance Program. In 2008, Mr. Jackson was tasked by the City of  Weston to have the City become participants of the Community Rating System. CGA  performed various engineering and surveying services, assembled existing information,  consulted with the City’s Public Works Department, prepared the application package,  and submitted the request to FEMA’s Ms, Susan Wilson and Ms Sue Hopfensperger, CFM  ISO/CRS Specialist for this application. CGA personnel worked with the ISO/CRS  reviewer to eventually have the City become CRS participants with a Classification of 8.  FEMA Administration for the City of West Park, Florida. Worked closely with Ms,  Susan Wilson, CFM  Chief, Floodplain Management and Insurance Branch Division  DHS/FEMA Region IV on requirement issues and work closely with Ms Mollie Heibert  Rosario, MS, CFM Floodplain Management Specialist National Flood Insurance  Program/Mitigation out of Tallahassee who performs the Community Assistance  Contact Report.  City of Sunny Isles Beach, Florida. Supervised the development of a base map for GIS  by compiling all recorded plats within the City limits.  PROFESSIONAL REGISTRATION Professional Surveyor and Mapper, State of Florida No. 4158 PROFESSIONAL ORGANIZATIONS Past President, Florida Surveying and Mapping Society Page 3| 21 Robert Jackson, PSM, Page 2  City of Pembroke Pine Boundary survey for a 167­acre parcel, Broward County, Florida. In addition  to the information provided by the client, research was required for adjoining ownerships and right‐of‐way  maps for I‐75 corridor as well. The survey was accomplished using and overall static GPS traverse that  included sectional work along with conventional sub‐traverses utilized for finding or setting property  corners and locating improvements. At the completion of the AUTOCAD drawing all aspects of the project  were reviewed for completeness and compliance with Minimum Technical Standards (MTS).  Dania Cove, Dania Beach, Florida. Prepared a Boundary and Topographical survey that delineated mean  high water along the Dania Cut‐Off Canal. All in accordance with the State of Florida minimum technical  standards for land surveys as defined by Chapter 5J‐17.05 of the Florida Administrative Code.    City of Lauderhill, Florida, Storm Water locations­GPS:Project Manager responsible for all survey  aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning  System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure  the project was on time and on budget.  City of Weston, Florida, Sign Inventory­GPS (City of Weston Surveyor): Project Manager responsible  for all survey aspects of this project. Project involved locations of City signage. This included informational  signs and all traffic signs throughout the City. Survey Crews cataloged, height, type of sign and condition  with the Global Positioning System (GPS). Performed quality control throughout the project. Coordinated  weekly meetings to assure the project was on time and on budget.  City of Weston, Florida, Stormwater Improvements­GPS: Project Manager responsible for all survey  aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning  System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure  the project was on time and on budget.   Page 3| 22 GREGORY J. CLEMENTS, PSM  Survey Support Services  SUMMARY OF QUALIFICATIONS   Mr. Clements has 43 years of experience as a surveyor and mapper. He is expert in all  phases of land surveying including the retracement of section lines, lot lines, tract lines,  right‐of‐way (ROW) lines, and centerlines. Mr. Clements’ responsibilities include  preparation of proposals, budget control, quality control (QA/QC), and technical support  for the field crews. He also coordinates the preparation of legal descriptions, record  plats, ROW maps, boundary surveys, topographical surveys, and acts as the liaison  between the client and the firm.  PROJECT EXPERIENCE  City of Tamarac, Florida.  Prepare multiple boundary surveys of parcels of land being  acquired by the City for a new park and cell tower site.  Town of Davie, Florida.  Prepare Boundary, Topographic and Tree surveys on  proposed 10‐acre Water Treatment site. Additionally prepared and recorded a Plat and  wrote multiple sketch and descriptions for utilities for the same site.  City of Pahokee, Florida. Prepared sketch and legal description of new Community  Redevelopment Area (CRA). Involved research into the old records used to establish the  City.  Various Substation Surveys, Miami­Dade, Broward, Palm Beach Counties, Florida.  Prepared boundary, tree, and topographic surveys on substations ranging in size from 2  to more than 40 acres.   Gulfstream Park, Hallandale Beach, Florida. Prepared plat boundary and topographic  surveys of 260‐acre horse track/entertainment complex. Combined aerial mapping  techniques with conventional survey methods to produce a high quality drawing under  budget.  City of Lauderhill GIS Drainage Infrastructure Inventory, Lauderhill, Florida.  Responsible for creating data dictionary fields and uploading to Trimble pathfinder.  Data downloading and processing of GPS files using Trimble GPS Pathfinder Office and  outputting into ESRI shape files and attribute data files.  City of Weston. Since 1997 responsible for multiple Route surveys throughout the City.  Surveys were used by engineers to design major roadway and utility improvements.   City of Sunny Isles Beach Responsible for Boundary/Topographic Surveys and Platting  of City Park. Prepared multiple sketch and descriptions for land swaps, easements and  land use revisions.  City of Weston Reviewed multiple Title Reports prepared by various title companies of  properties throughout the City looking for easements that dedicated access and  maintenance obligations to the City as owner of Public Utilities.  Town of Surfside. Responsible for route surveys covering the entire Town. These were  used to design a major redo on the potable water system.  EDUCATION Bachelor of Business Administration University of Toledo, Geographic Information Systems I & II, offered under the M.S. in Geography Program, Florida Atlantic University PROFESSIONAL REGISTRATION Registered Professional Surveyor/Mapper State of Florida, No. 4479 Registered Professional Surveyor, State of Ohio, No. 6545 Registered Professional Land Surveyor State of Texas, No. 4197 Page 3| 23 TAHIR IQBAL, P.E. –Sr. Structural Engineer Registration PE#: 48061 Technical Experience: Civil/structural consultant with Parks & Recreation Department. On call for emergency consultation, investigation, design of alterations and feasibility studies. Complete geometrical design of Black Point Park & Marina and, design and renovation of waterfall for Metro Zoo. Civil/structural consultant to Dade County School Board. Responsibilities similar to above. Civil/structural consultant for Dade County Aviation Department. Responsible for preparing the Master Plan of Utilities for Miami International Airport (MIA), prepared the Drainage Study report for MIA. Responsible for preparing the Master Plan of Cargo Building for Miami International Airport. Civil/structural consultant to U.S. Army Corp. of Engineers, Mobile District. Responsible for complete structural design and specifications for hanger project. Design projects for architects, governmental agencies and private clients ranging from single-family residence to hi-rise buildings, industrial and commercial facilities, educational and sports facilities, parking garages, military projects, detention facilities, water treatment facilities, wastewater treatment facilities and bridges. Major Project for Miami International Airport 2 – 70,000 sq ft Cargo Building prepare the master plan for cargo terminal for Miami International Airport Parking Garage No. 7 repair & restoration Major Projects for the City of Indian Trace Structural and drainage design, specifications and contract documents for the Weston Road Bridge, Section 29, Township 50 S, Range 40 E, Broward County. Major Project for Miami International Airport 2 – 70,000 sq ft Cargo Building prepare the master plan for cargo terminal for Miami International Airport Parking Garage No. 7 repair & restoration Major Projects for the City of South Miami Structural design, specifications and contract documents for the South Miami Police Station and Maintenance Facility. Structural and drainage design, specifications and contract documents for Florida Department of Transportation, Intersection Improvement at Quail Roost Drive, Eureka Drive, NW 87 Avenue and 8 Street. Curriculum Emphasis: Structural: Structural dynamics, structural analysis, prestressed concrete design, advanced steel and concrete design and, design of bridge structures. Geotechnical: Fundamentals of Soil mechanics and foundation engineering. Construction: Engineering Materials, Project Cost Estimating. Independent Study: Non-linear analysis of reinforced concrete frame-wall structures using the DRAIN-2D Computer Program. Bachelor Thesis: Critical Path Method (CPM) in Construction Practice. Page 3| 24 SABRINA BAGLIERI  Construction Observation/Inspection/Shop Drawing Review  SUMMARY OF QUALIFICATIONS   Ms. Baglieri has over 23 year’s civil engineering/construction management experience.  She is an expert in the selection, setup, management, and control of roadway, parks and  buildings projects: from the bidding processes to their completion and culmination. She  is also experienced in the management practices of hurricane debris collection  monitoring and data recording and with LAP compliance issues.  Ms. Baglieri has  working computer knowledge on operative systems such as DOS, Windows and the  following programs: Cadd2000, Excel, Microsoft Word, Timberline, Construction Link  (CLI), Primavera, PowerPoint, and Quattro Pro for Windows.  Ms. Baglieri has extensive experience and knowledge directly applicable to all types of  projects, relying on her background in engineering, construction and project  administration.  Furthermore, she is well versed in the municipal processes necessary to  get work tasks completed on time, as well as she has demonstrated experience working  within allocated budgets.  These skills and aptitudes have all been exercised in her  capacity as Director of Capital Improvements for several local municipalities through  Calvin, Giordano & Associates’ various continuing services municipal contracts.  The  breadth of her work has spanned all realms of implementation projects – from small  residential‐scale, community‐scale, and urban scale.  As such she has the necessary  knowledge in the management of the dynamics inherent in work scheduling, tasking,  sequence matrices necessary to maintain continuity of work and fulfillment of the  assessed milestones.  These are important issues, especially when dealing with LAP  funding, grants monies, bond assessments, and in both responding to the expressed  needs of the community and to the management of complaints and issues in an  expedited manner  PROJECT EXPERIENCE  City of Weston, Florida Projects   Vista Park:  ‐ Boulevard: new roadway construction  ‐ Vista Park Development: Construction of 4 soccer fields, 4 softball fields, 2  concession buildings, a maintenance building, and parking area. Provided  lighting, lift station, water and sewer designs   Traffic Signals for Weston Road/South Commerce Parkway   Tequesta Trace Concession Building Parking and Drainage   Bonaventure Master Plan Phase I, II, III and IV. Upgrade of all drainage,  landscape, and roadway elements   Saddle Club Rd @ South Post Road Roundabout   Bonaventure Blvd. @ Blatt Road Roundabout   New traffic signals for Weston Road/North Corporate Lakes   FS 55 Emergency Signal   Saddle Club/Arvida/Bonaventure overlay of roads and road/drainage  improvements   Bonaventure/Racquet Signal   Regional Park/Parking Modification. Construction of Loop Road to connect  existing parking lots  EDUCATION B.A., Civil Engineering, Universidad Rafael Urdaneta Maracaibo, Venezuela CERTIFICATIONS Governor’s Hurricane Conference Recovery Disaster – The Local Government Role Erosion Control Certified Inspector CTQP Final Estimates 1 CTQP Earthwork Construction Inspector 1 CTQP Asphalt Paving Technician Level 1 OSHA Construction Safety + Health Page 3| 25 Sabrina Baglieri, Page 2   Drainage Improvements   I‐75 Master Plan Local Traffic Improvements    Windmill Lakes West Buffer   Weston City Hall   Weston Public Works Facility with Fuel Station   Weston Library Park   County Isles & Three Village Roadway Improvement   Manatee Isles Roadway Improvements   AYSO Facility at Regional Park   Indian Trace Development District – Pump Stations #1 & #2 Rehabilitation   Municipal Inspections for all permitted construction in the City of Weston   Hurricane Debris Removal Monitoring and Inspection, including managing of all monitors, dump  site and data record keeping  Sunny Isles Beach, Florida Projects   181st Drive Active Park ‐ Construction of a 2 acre park, consisting of one gymnasium, a new  recreation center, a baseball field, parking and landscaping.   172nd Roadway Improvements   Atlantic Isles Roadway and Utility Improvements   Contracts Administration for all Capital Improvements project  Bay Harbor Islands, Florida Projects   Broad causeway Toll Plaza Widening   Community Enhancement Phase II   Kane Concourse   192nd Street Park   Community Enhancement Phase III  Miscellaneous Florida Projects   Pines Wastewater Treatment Plant Expansion   Miramar East Water Treatment Plant Expansion   Miramar West Wastewater Treatment Plant Expansion  Hurricane Debris Removal – Monitoring Services   City of Weston – Complete Monitoring services for compliance of FEMA requirements   Town of Davie – supplied monitors to be directed by city personnel.   City of North Lauderdale – Complete monitoring on the waterways clean‐up  Page 3| 26 BRUCE BERNARD  Construction Observation/Inspection/Shop Drawing Review  SUMMARY OF QUALIFICATIONS   Mr. Bernard’s experience and education has been obtained through on the job training  within related fields.  Beginning with the plumbing trade in the early 1970s, he was able  to progress to public and private utility plant and field operations for ten years.  He  advanced to the public sector for fourteen years.  During his tenure in the public sector,  Mr. Bernard gained knowledge of drainage concepts and installation, water and  wastewater design and installation, roadway construction, and trail system  management and wetland requirements.  He served for six years as Department  Director for Public Works and Capital Projects.  Mr. Bernard gained experience in  drainage system layout and maintenance, right‐of‐way maintenance, Capital  Improvement project and preparations, plus coordinating of projects through  governmental agencies.    PROJECT EXPERIENCE  Field Manager, Calvin, Giordano & Associates, Inc. (2006­Present). Mr. Bernard is  responsible for project construction management, installation inspection, and field  coordination of site work, roadways, drainage and underground utilities.  Public Works Director, Town of Davie, Davie, FL (1981­2006).  Directed operations  within department in regard to buildings, parks, roadway, right‐of‐way, trail system and  stormwater maintenance.  He was responsible for the management of Town of Davie  Capital Projects including construction for parks and governmental buildings.  He  supervised a staff of seventy‐two employees, managed a six‐million dollar department  budget, and eight million dollar capital improvement budget.  During his tenure with the  Town of Davie, Mr. Bernard served as Chief Wastewater Operator, Assistant Utility  Director, Capital Projects Coordinator, and Chief Engineering Inspector.  Lead Operator Wastewater Plant, City of Lauderhill, Lauderhill, FL (1976­1981).   Mr. Bernard supervised the operations at a 4 MGD Wastewater Plant with sand filters  with polishing pond for surface water discharge.  He gained experience in dealing with  governmental agencies, activity reports, payroll detailing and supervisory skills  overseeing a staff of ten.  Plant Operator, Southern Gulf Utilities (1974­1976).  Mr. Bernard began as an  operator trainee and achieved both water and wastewater operator’s licenses within  one year.  He worked to gain knowledge of field operation and plant design.  Plumbers Apprentice, Mears Plumbing (1972­1974).  Mr. Bernard was responsible  for installing rough and top‐out installation in newly constructed residential units.  EDUCATION B.S. Civil Engineering, University of Florida, 1996 REGISTRATIONS Florida Professional Engineer License No.: 56969 Florida Certified General Contractor License No. 1511653 TRAINING AND CERTIFICATIONS: TIN: M620725711660 Asphalt Paving Level 1 Earthwork Level 1 Earthwork Level 2 Nuclear Surface Moisture Density Certification QC Manager IMSA - WZTC Safety Program Advance MOT WZTC Level 2 – Traffic Safety in the Work Zone Erosion Control and Stormwater Management Page 3| 27 HANZEL RUBI  Construction Observation/Inspection/Shop Drawing Review  SUMMARY OF QUALIFICATIONS   Mr. Rubi has over 4 years of experience in the engineering/construction field, as an  inspector.  In his current position as a Field Coordinator, he is involved with water &  sewer systems, lift stations, construction and rehabilitation, drainage systems and  roadways (widening and new), and parks.    PROJECT EXPERIENCE  Field Coordinator, Calvin, Giordano & Associates, Inc. ­ Fort Lauderdale, FL   Review plans and specifications of assigned project with construction  supervisor; attend pre‐construction conferences.   Inspect materials for identification as conforming to specifications and plans.   Inspect all phases of construction of public works and private development  projects.   Inspect various structures such as utilities, streets, sidewalks, gutters, curb,  drainage, sewer, water and other off‐site construction; check line, grade, size,  elevation and location of structures for conformity with specifications and  regulations.   Record amounts of materials used and work performed; prepare necessary  reports for progress payments.   Help locate other utility structures ahead of work sites.   Coordinate work with other City departments and utilities.     Determined quantity of work performed for contractor's payments.   Checked to determine if barricades, lights, and flagmen are properly utilized at  construction sites.   Assumed personal responsibility for ensuring that duties are performed in a  safe, efficient manner. Performed other related duties as assigned.   Responsible for the daily inspection and testing.   General oversight of earthwork placement and testing, sub‐grade and base  inspection and testing.   Maintained an inspector's diary and prepared written reports.   Worked with the City of Weston and Parkland as Engineering and Zoning  Inspector.  CERTIFICATIONS Asphalt Paving Technician Earthwork Construction Inspection Nuclear Safety Certification Page 3| 28 JUAN CARLOS ECHAVARRIA  Construction Observation/Inspection/Shop Drawing Review  PROJECT EXPERIENCE   Calvin, Giordano & Associates, Fort Lauderdale FL (08/2011 – Present) Field  Coordinator/ Construction Inspector: Review construction documents and inspect the  construction of projects from the design phase through completion of construction.   Exercise considerable independent judgment in the monitoring of project  progress in relation to construction schedule and reporting to the field manager,  project administrator and engineer   Record and report all unacceptable work and follow up on defective work  corrected by the contractor   Verify and review pay requisitions from the contractor to include measuring all  field quantities for correctness   Maintain daily reports of construction activities and inspections along with  photographs documenting construction progress   Tasked with inspecting over 30,000 feet of watermain, 5,000 feet of drainage  pipes, 3 pump stations, 9 drainage wells and 50 structures as well as 70,000  square yards of paving and 15,000 feet of curb and gutter  Horizon Contractors, Hialeah FL, 01/2005 ‐‐ 08/2011, Construction Inspector:   Oversee projects from permit approvals through construction and community  turnover   Responsibility for the successful delivery on new projects through the use of  construction schedules, contract documents, land development budgets,  environmental studies, geotechnical reports, engineering and construction plans  and permit compliance reports   Scheduling and coordinating construction activities, supervising crews and  subcontractors, working with engineers, project managers and city officials   Assists the project manager with preparation of pay requisitions for the head  office  PROJECTS COMPLETED   City of Miami – 36th Street DOT Drainage Improvements   City of Miami – Flagler Drainage and Utilities Improvements   City of Miami Beach – South Pointe Drainage Improvements   City of Miami Beach – Drainage Improvements and Paving   Town of Bay Harbor Islands – Streetscape Enhancement  EDUCATION Miami Dade College, Miami, FL (01/2004 -- 08/2005), Associate of Art in Business Administration CERTIFICATIONS/ TRAINING Completed OSHA Construction Safety and Health Course ATSSA Florida Advanced Work Zone Traffic Control Course Confined Space Trained Page 3| 29 TAMMY COOK­WEEDON, ASLA, RLA, LEED­AP  Landscape Architectural Support Services  SUMMARY OF QUALIFICATIONS   Ms. Cook‐Weedon leads the Landscape Architectural staff, founded on her over 24 years  of Landscape Architectural experience with demonstrated strengths in creative design,  graphic presentations, and planting design.  She has successfully completed numerous  large scale projects which encompassed design studies, planting designs, and the  various intersecting professions and tasks necessary to manage the projects through to  completion.    PROJECT EXPERIENCE  North Shore Neighborhood Improvements, Miami Beach, FL; Landscape Architect;  Client: City of Miami Beach: Implemented the City’s BODR and designed the planned  improvements, including character landscaping, streetscapes, parking, lighting, ADA  access and waterline replacement for more than eight miles of urban, neighborhood  corridors.  Hickory Point Recreational Facilities, Tavares, FL; Landscape Architect; Client:   Lake County Water Authority: The project consisted of the site design of a waterfront  park that included marinas, boat ramps, wetland educational boardwalks,  environmental signage, fishing stations and a communal pavilion.  Kane Concourse Beautification, Bay Harbor Islands, FL; Landscape Architect;  Client: Town of Bay Harbor Islands: Developed streetscape improvements for the  town’s business district, including specialty paving, street furnishings, wayfinding,  landscape planting and irrigation, with particular attention to maintaining the existing  Miami Modern architectural quality as a branding element of the corridor.  Joe DiMaggio Children’s Hospital Visitor’s Clubhouse, Hollywood, FL; Landscape  Architect/Project Manager; Client:  Memorial Healthcare System: Prepared the site  and landscape design for a restorative garden with a playground area specifically for the  use by children users of the Joe DiMaggio facility.  Gator Run Park, Weston, FL; Role; Client:  City of Weston: Passive park design for a  5‐acre community park including lighting improvements, continuous walking paths,  children’s play equipment, planting and irrigation design.  The design provided a  butterfly garden and shade structures in proximity to and to build strong connections  with the adjacent elementary school  Deering Estate at Old Cutler, Palmetto Bay, FL; Role; Client:  Miami­Dade County  Pak and Recreation Department: Historical restoration and landscape design to repair  the damaged areas of the estate following Hurricane Andrews devastation of the  property, including detailed archeological planting design, habitat restoration and  planting design for a new visitors’ facility.  Sombrero Beach Park, Marathon, FL; Role; Client:  City of Marathon: Park master  plan and design for the creation of a beachfront park with dune access, volleyball courts,  playgrounds, beach amenities, dune and turtle nesting habitat restoration.  EDUCATION B.S. Landscape Architecture, Texas A&M University, College Station,1987 PROFESSIONAL REGISTRATION Registered Professional Landscape Architect, State of Florida No. 0001328 PROFESSIONAL AFFILIATIONS American Society of Landscape Architects, Miami Section Chair, 1997-1998 Broward Section Chair, 2003-2004 State conference Sponsorship Chair, 2003 ASLA Executive Committee, 2004-2007 US Green Building Council Magic of Landscapes Board Member, 2006-2007 Page 3| 30 Tammy Cook­Weedon, ASLA, RLA, LEED­AP, Page 2  Eagle Point Park, Weston, FL; Role; Client:  City of Weston: Passive park design for a 4‐acre community  park including lighting improvements, continuous walking paths, children’s play equipment, planting and  irrigation design.  Redlands Fruit and Spice Park, South Dade, FL; Landscape Architect/Project Manager; Client:  Miami­Dade Park and Recreation Department: Botanical garden design showcasing the relationships  between agriculture and culture, with particular attention to creating an around‐the‐world thematic design  with thoroughness in details about planting arrangements, cultivated species and spatial qualities.  Miramar Parkway Landscape Improvements, Miramar, FL; Landscape Architect/Project Manager;  Client: City of Miramar: Prepared conceptual designs for gateway features at the entrance into the city.  The designs included architectural elements, branding, urban greenways and character planting.  Patricia A. Mishcon Athletic Field, North Miami Beach, FL; Landscape Architect; Client: City of North  Miami Beach: Developed site design for an active park facility with multiple fields that established a strong  connection to an adjacent linear park housing the city’s annual Italian Festival.  Corridors Beautification Master Plan, Weston, FL; Landscape Architect; Client: City of Weston:  Developed master plan and landscape design for planting and branding along all major thoroughfares of  the city, including lighting and gateway features.  Campus Support Facility, Miami, FL; Landscape Architect/Project Manager; Client: Florida  International University: Provided courtyard design for passive outdoor uses, including a water feature,  bronze sculpture, planting and irrigation design through careful coordination with the architectural  character of the surrounding building.  Biscayne Boulevard Improvements, North Miami Beach, FL; Landscape Architect/Project Manager;  Client: City of North Miami Beach: Prepared branding, planting and irrigation design services in  coordination with FDOT. The project also included landscape treatments around the existing FPL  substation and all coordination of its components.  Cooper City Sports Complex, Cooper City, FL; Landscape Architect/Project Manager; Client: City of  Cooper City: Designed an active park with roller hockey rinks, soccer and baseball fields, lighting,  restrooms and concessions. An important consideration in the design was establishment of a strong, legible  connection to the surrounding neighborhoods and including both a fire station and a police station.  Page 3| 31 GIANNO ANTONIO FEOLI, ASLA, AIA  Landscape Architectural Support Services  SUMMARY OF QUALIFICATIONS   Mr. Feoli leads the Landscape Department in creative design strategies for urban  environments with specialties including urban design, contextual analysis and branding.   He also conducts most of CGA’s master planning, transit‐oriented designs, community  participation efforts and graphic communication services.  His experience has  encompassed a wide array of project‐types, and his strengths lie in park design,  streetscapes and urban interventions, and form‐based urban designs and planning  strategies.   RECENT PROJECTS  Beachwalk Master Plan, Surfside, FL; Project Manager, Lead Designer; Client:   Town of Surfside: Master plan of a 1‐mile linear park that connects all street‐end plaza  components with access to the beach, including dune and turtle habitat restoration,  branding sculptures, salt‐tolerant character plantings, and specialty paving design.  92nd Street Park, Bay Harbor Islands, FL; Project Manager, Lead Designer; Client:   Town of Bay Harbor Islands: Site design and landscape design of a 2‐acre urban  community passive park with a dog run area, flexible open space, branded planting  design, urban plaza and furnishings.   Peace Mound Park, Weston, FL; Lead Designer; Client:  City of Weston: Developed a  design for a waterfront passive park that celebrates the existence of an archeological  Tequesta Indian burial mound.  The design sought to reflect the presence of the burial  mound with elements abstracted from the Tequesta way of life and belief.  Doral Boulevard Beautification Master Plan, Doral, FL; Project Manager, Lead  Designer, Workshop Facilitator; Client:  City of Doral: Streetscape and urban design  for a 4‐mile stretch of Doral Boulevard, creating planning zones, access management  design recommendations, signage and gateway features, stipulating architectural  relationships to improved sidewalk design and parking design recommendations.  Miami Gardens Town Center, Miami Gardens, FL; Project Manager, Lead Designer,  Workshop Facilitator; Client:  City of Miami Gardens: Developed and TOD and Town  Center design for over 100 acres of derelict and underutilized urban contiguous areas in  preparation for the mass‐transit MetroRail expansion and its new station scheduled at  the site.  The project consisted on the development of planning and design standards  and ordinances that allowed for balanced densities to support the public transit system  and a new commercially viable, walkable community.   EDUCATION Master of Landscape Architecture Florida International University, School of Architecture, Miami, FL B.A., Architectural Studies Florida International University, School of Architecture, Miami, FL PROFESSIONAL AFFILIATIONS American Society of Landscape Architects American Institute of Architects Urban Environment League US Green Building Council Page 3| 32 DAVID GRASSO­O’BRIEN, LEED AP  Landscape Architectural Support Services  SUMMARY OF QUALIFICATIONS   Mr. Grasso‐O’Brien is a certified Florida landscape inspector with more than four years  of experience. He performs landscape inspections and code enforcement services for  projects within the cities of Weston, West Park, and North Lauderdale. Additionally, Mr.  O’Brien has experience in monitoring invasive plant species and in GIS for tree  inventory.   PROJECT EXPERIENCE  Landscape Inspector, Calvin, Giordano & Associates, Fort Lauderdale, Florida  (April ’05 – Present)   Conducted landscape inspections for:  o Hallandale Beach Boulevard FDOT landscape Improvements Project   o Opa Locka Executive Airport, Miami‐Dade County Aviation Department  Landscape Improvement Project Miami International Airport Landscape  Improvement Project   Conducted landscape inspections and enforced municipal landscape codes for  cities of Miramar, North Lauderdale, Weston, and West Park   Arranged and carried out annual landscape inspections of commercial  properties for City of Weston. Prepared reports and scheduled follow‐up  inspection for code compliance   Monitored for invasive exotic and nuisance species of plants for City of Weston   Assisted Code Compliance Department enforcing health and safety codes for City  of North Lauderdale   Processed tree removal permits and obtained inspection approvals for City of  Weston   Recorded GPS coordinates and identified landscape plant material in GIS format  for City of Weston and City of Lauderdale Lakes tree inventory  Biological Scientist, University of Florida, Davie, Florida (August 2002 – April  2005)   Created and maintained a one‐acre butterfly demonstration garden   Designed, installed and maintained irrigation system    Identified and labeled native and exotic plant material   Conducted tours of butterfly garden and demonstrated plant use for wildlife  habitats   Formulated a plant inventory with digital photographs and Excel spreadsheets.  Lab Technician, University of Florida, Davie, Florida (August 2001 – August 2002)   Manipulated and enhanced entomology photographs for the World Wide Web;   Helped create Microsoft PowerPoint presentations for entomology seminars;   Produced literature and visual aids on urban entomology issues for Broward  County Extension Education  EDUCATION Bachelor of Science in Environmental Horticulture, University of Florida, Gainesville, FL, 2008 Bachelor of Science in Agronomy, University of Connecticut, Storrs, CT, 2001 PROFESSIONAL REGISTRATION / CERTIFICATIONS Florida Nursery Growers and Landscape Association HP Cert#H67-5646 International Society of Arboriculture ISA Certificate #FL-1336A International Society of Arboriculture (ISA) Arborist Municipal Specialist Florida Landscape Inspector Cert#2003-0236 FACE Code Enforcement Level III Certification LEED Accredited Professional PROFESSIONAL ASSOCIATIONS Member of International Society of Arboriculture Member of Landscape Inspectors Association of Florida Member of USGBC Member of Florida Association of Code Enforcement Page 3| 33 HIEN NGUYEN, ASLA, ISA, FACE   Landscape Architectural Support Services  SUMMARY OF QUALIFICATIONS   Ms. Nguyen has a master’s degree in landscape architecture and over eight years of  experience in environmental science, botany, and landscape architecture. She is  particularly well versed in tropical plant taxonomy, physiology, morphology, and  economic botany, necessary elements in providing landscape inspections. In addition to  being skilled in typical office software programs, she is capable with AutoCAD and  Adobe Photoshop. She has been the recipient of numerous awards and has received  several grants.  PROJECT EXPERIENCE  City of Weston, Landscape Code Enforcement. Enforced city landscape code for  compliance and presented violations to special magistrate.  City of Weston, Landscape Review and Inspections. Reviewed and inspected new  commercial developments and single family residences to ensure code compliance.  City of Weston, Debris Removal. Monitored and documented trucks removing debris  from residential areas. Documented (measured, GPS, and calculated amount) tree  stumps removed throughout the city, and evaluated trees requiring removal because of  life safety issues (hazardous trees) and amount of damage done to the tree.  Annual Landscape Inspection Program, City of Weston, Florida. Primary landscape  inspector. Inspect existing commercial developments for landscape compliance.   Roots in the City Project, Florida International University, Miami, Florida. As  project manager, coordinated garden maintenance and four full‐time employees and  national volunteer groups. Designed garden layout and wrote grants.  Hardwood Hammocks Recovery after Hurricane Andrew, University of Miami,  Miami, Florida. Collected soil and plant samples. Tagged, labeled, and measured plant  specimens.   Fairchild Research Herbarium, Fairchild Tropical Garden, Miami, Florida. Entered  herbarium specimen data specializing in cycads in database.  EDUCATION Master of Landscape Architecture, Florida International University, Miami B.S., Environmental Studies, FIU, Miami PROFESSIONAL REGISTRATION AND CERTIFICATION American Society of Landscape Architects (ASLA), No. 1087025 Florida Association of Code Enforcement (FACE), No. 4589 ISA Certified Arborist, No. FL-5282A Level I Code Enforcement Certification Level II Code Enforcement Certification AWARDS 2002 Florida Chapter American Society of Landscape Architects - Professional Merit Award for Virginia Key Beach Park and Biscayne Blueways 2001 Commendation from City of Miami Commissioner Arthur Teele, Little Haiti Park Design Workshop 2001 $25,000 Empowerment Zone Grant Overtown Horticultural Training Program Page 3| 34 RICK DEROSIA, PE  Constructability Review  SUMMARY OF QUALIFICATIONS   Mr. DeRosia has more than 30 years of professional experience in project management  and design of water and wastewater treatment facilities.  His experience with  construction and project management is an asset for any project.  Mr. DeRosia is very  familiar with various clients, vendors and subcontractors in all phases of municipal  design and construction.   PROJECT EXPERIENCE  Project Engineer:   He has designed, permitted and managed projects for water and  wastewater pumping stations, water and wastewater treatment plants, wet wells and  water distribution systems.  His projects included pump stations for Miami‐Dade Water  and Sewer Authority, upgrades to Miami‐Dade North District Wastewater Treatment  Plant and Miami‐Dade Northwest Wellfield Water Distribution System.  Project Manager:  He has been manager of numerous construction projects where he  was required to create budgets, set up schedules, perform inspections, prepare monthly  cost reports, prepare change orders, provide punch lists and finalize project close out.   His responsibilities included coordination of vendors, sub‐contractors, office personnel,  sub consultants and clients to meet all goals throughout the projects.   WATER AND SEWER DESIGN EXPERIENCE  Miami‐Dade WASA Water Distribution.  Design and manage new 72” water transmission  main, 15 new pump buildings with 24” well pumps and generator/switchgear building.    Miami‐Dade WASA Pump Station 12‐P5.  Design and manage new caisson pump station,  force main, gravity line, obtain permits, and perform inspections.  WATER AND SEWER CONSTRUCTION EXPERIENCE  City of Cooper City Wastewater Treatment Plant.  Project Manager for construction of  new two mgd treatment plant, blower building, chlorination building, electrical building,  piping, valves and controls.  City of Pembroke Pines Wastewater Treatment Plant.  Project Manager for construction  of new two million gallon per day treatment plant, headworks facility, generator  building, odor control units, high service pump station, chlorination building, diesel fuel  facility, gravity and force main piping.  City of Cooper City Sludge Treatment Facility.  Project Manager for construction of  new  concrete sludge drying beds, piping, sludge conveyor system, paving, drainage and  control system.   City of Lake Worth Pump Station Rehabilitation.  Project Manager for construction of  removing and replacing high service pumps, pipe and valves, generator, electrical  equipment, fuel tanks, instrumentation and controls.  Install by‐pass pumping systems,  force main piping, paving and drainage.  City of Port St. Lucie Booster Pump Station.  Project Manager for the construction of one  million gallon prestressed storage tank, horizontal pumps, control valves, generator,  switchgear, paving and drainage.    EDUCATION Bachelor of Science in Civil Engineering, Clarkson University, May 1975 PROFESSIONAL REGISTRATION Professional Engineer State of Florida, No. 38604 PROFESSIONAL ASSOCIATIONS Member Florida Engineering Society CIVIC ACTIVITIES Member Boys & Girls Club of North Lauderdale Board Page 3| 35 Rick DeRosia, PE, Page 2  Martin County Leachate System. Project Manager for construction of new steel storage tanks, bioreactor  systems, sand filter system, reverse osmosis facility, structural slabs, lift station, force main piping, paving,  grading, drainage, electrical and control system.   City of Riviera Beach Master Lift Station.  Project manager for construction of new building, horizontal  pumping system, wet well, telemetry system, generator, switchgear, diesel fuel tank, paving, drainage and  landscaping.   Town of Davie Wastewater Treatment Plant Upgrades.  Project Manager for construction of new two mgd  steel treatment tank, headworks facility, sludge press facility, sludge conveyor system, blower building,  steel ductwork, lift station, generator, switchgear and protective coatings.  City of Coral Springs East Pump Station.  Project Manager for construction of new booster pump station  building, two million gallon prestressed concrete tank, underground propane fuel tank system, site  retaining wall, landscaping, paving and drainage.  Broward County Digester Improvements.  Project Manager for construction of two million gallon  prestressed digesters with steel floating covers, return sludge pumps, rotary sludge pumping system, boiler  system, methane gas burning system, air compressor system, 48” deep injection well force main piping,  electrical and controls.  North Springs Improvement District Water Plant Additions.  Project Manager for construction of new  administration building, structural concrete filter beds, lime silo, lime slaker system, pumping system, retaining  wall, chlorination system, security system, paving, landscaping, drainage and fiber optic control system.  Coral Springs Improvement District Water Supply Wells.  Project Manager for 16’’ force main piping  system, canal crossing, water supply wells, automatic control valves, fiber optic control system and  electrical ductbanks.   City of West Palm Beach Rehabilitation of Existing Clarifiers.  Project Manager for construction ;of  removing and replacing eight clarifiers, dewatering system, new scum pumps, electrical and controls.  Broward County North Regional Wastewater Treatment Plant Digester Cover.  Project manager for  construction of new steel digester cover, demolition, sandblasting, painting, recirculation pump, digester  gas guns and air compressor system.  South Florida Water Management District Hurricane Hardening Project.  Project Manager for construction  of applying gunite to strengthen walls, reinforcing steel, protective coatings, new HVAC system, roofing and  electrical.  City of West Palm Beach Transfer Pump Stations.  Project Manager for installation of new axial pumping system,  wetwells, baffles, troughs, piping, valves, by‐pass pumping, flow meters, controls and electrical system.  City of Fort Lauderdale Poincianna Park Pump Station.  Project Manager for construction of new horizontal  pump system, two million gallon prestressed storage tank, generator, switchgear, fuel tank system,  telemetry system, controls, drainage, paving and landscaping.  City of Boca Raton Primary Clarifier Rehabilitation.  Project Manager for removing and replacing two one  hundred foot clarifier mechanisms, demolition, odor control system, hvac system, chemical supply system,  in line flow meters, electrical and controls.   Page 3| 36 DONALD WINDHAM  Senior Associate/Constructability Review  SUMMARY OF QUALIFICATIONS   Mr. Windham has 55 years of engineering construction experience including generating  construction drawings and cost estimates, as well as providing construction inspection  services for all types of civil engineering projects. He is responsible for the review of all  engineering plans prior to construction and prides himself on reviewing the projects as  if he were the contractor bidding the project. He supervises six full‐time field inspectors  and oversees all projects under construction.  With his experience, Mr. Windham can generate extremely reliable detailed construction  drawings and other preconstruction information. He also prepares cost estimates for  major and minor highway design projects, water and sewer facilities pump stations,  drainage systems, pollution control structures, earthwork operations, landfills, and  major commercial residential developments.  PROJECT EXPERIENCE  Wastewater Treatment Plant, City of Hollywood, Florida. Managed all site grading  and stormwater drainage construction.  Managed all elements of construction management for these projects:   Wastewater Treatment Plant Expansion, Phase II, Dania, Florida   Water Treatment Plant, Davie, Florida    Water Treatment Plant Expansion to 18 MGD, Pembroke Pines, Florida   Water Treatment Plant Color Removal, Pembroke Pines, Florida   Water Booster Pump Station No. 2 (Academic Village) Design and Construction,  Pembroke Pines, Florida   All Engineering Projects, City of Weston, Florida. Construction management and  engineering permitting for all projects designed by CGA’s Engineering Department  including Water Distribution and Wastewater Collection System Expansion and  Modification.  Construction Management (Roadway):   Palm Avenue Improvements, City of Pembroke Pines/Broward County, Florida   Pine Island Road from Orange Drive to Nova Drive, Town of Davie and Broward  County, Florida   Pines Boulevard from I‐75 to US 27, City of Pembroke Pines, Florida   Pines Boulevard from Flamingo Road to I‐75, City of Pembroke Pines, Florida  PROFESSIONAL ASSOCIATIONS Underground Contractors Associations Engineers Contractors Association Page 3| 37 Water Resource Professionals Design • Consult • Manage 5079 North Dixie Highway, Suite 323 Oakland Park, FL 33334 FL #LC000346 TX #2474 WA #1092 866-928-1533 tel 800-928-1534 fax Resumé of TODD MOHLER, RLA  EDUCATION / PROFESSIONAL:  Bachelor of Landscape Architecture, (Magna Cum Laude), Clemson University, 1993  Registered Landscape Architect, Florida, 1997; Washington, 2008; Texas, 2008  Certified Landscape Irrigation Auditor (CLIA) – Irrigation Association, 2006  Certified Irrigation Contractor (CIC) – Irrigation Association, 2006  Certified Golf Irrigation Auditor (CGIA) – Irrigation Association, 2007  Certified Irrigation Designer, Residential/Golf/Commercial (CID-R/G/C) – Irrigation Association, 2007  Rain Water Catchment Systems Accredited Professional (RCS-AP) – ARCSA, 2008 YEARS EXPERIENCE: 13 years post-registration experience WORK EXPERIENCE:  February 2006 – Present – Masuen Consulting, LLC Director of Design and Consulting – Daily practice of Horticultural and Irrigation design and consultation focused in water conservation. As the Director of Design he manages all of the team’s design projects.  July 1997 – January 2006 –Keith and Schnars, P.A. Landscape Architect - Responsibilities included the direct production management of the production staff (7 designers) and its projects for both public and private sector clients. He acted as a senior designer/manager immediately involved in site planning, hardscape design and detailing, planting design and irrigation design. He had direct experience in roadway, retail, commercial, residential, streetscape and parks and recreational facility designs. He was responsible for oversight on construction cost estimating, construction drawings and specifications, construction bid review, field inspections, reports and public presentations.  April 1994 – May 1997– Santiago and Associates Project Designer - Responsibilities included design and production of planting and irrigation plans as well as General Water Use Permitting and project development meetings with public and private sector clients. PROFESSIONAL ORGANIZATIONS:  Professional Member of American Society of Landscape Architects (ASLA)  Corporate and Individual Member of United States Green Building Council (USGBC)  Professional Member of the Irrigation Association (IA)  Corporate member of The American Society of Irrigation Consultants (ASIC)  Professional Member of the American Rainwater Catchment Systems Association  EPA Water Sense Partner Page 3| 38 Water Resource Professionals Design • Consult • Manage 5079 North Dixie Highway, Suite 323 Oakland Park, FL 33334 FL #LC000346 TX #2474 WA #1092 866-928-1533 tel 800-928-1534 fax Resumé of JUDY JENSEN EDUCATION / PROFESSIONAL:  Associate of Arts in General Education, (with Honors), Daytona Beach Community College, 2003  Associate of Applied Science in Architectural & Building Technology, (with Honors), Advanced Technology Center at Daytona Beach Community College, 2005  Certified Landscape Irrigation Auditor (CLIA) – Irrigation Association, 2006  Certified Golf Irrigation Auditor (CGIA) – Irrigation Association, 2008  US Green Building Council LEED AP, 2008  Certified Irrigation Designer, Commercial, 2011 YEARS EXPERIENCE: 7 years WORK EXPERIENCE:  September 2005 – Present – Masuen Consulting, LLC  Water Resource Consultant & Training Manager – Responsibilities include training new designers, water conservation consulting, LEED consulting and design, irrigation design, & project design coordination. PROJECTS:  Port St Lucie Botanical Gardens, Port St Lucie, FL  Brickell Park, Miami, FL  44th St Park, Sunrise, FL  66th Avenue, Vero Beach, FL  S.R. 5, Ft. Pierce & Delray Beach, FL PROFESSIONAL ORGANIZATIONS:  Corporate Member of United States Green Building Council (USGBC)  Professional Member of The Irrigation Association (IA)  WaterSense Partner Page 3| 39 RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 4| 1  APPROACH / METHODOLOGY   Suitability of Methodology and Approach  Calvin, Giordano & Associates, Inc. (CGA) has an experienced and diverse staff in the field of construction  management. Our methods of approaching studies and projects have proved extremely effective for clients  throughout South Florida.  The CGA Team has provided the City of Sunny Isles Beach with superior quality work for the duration of  our project management contract. As a result of this relationship, CGA is intimately familiar with the City’s  standards and personnel. Aside from these factors, the CGA Team is qualified to be the owner’s  Construction Managers Support for implementation of capital improvement projects because of our  extensive work with local municipalities and their Capital Improvement Programs.  Understanding the Scope of Work  The first step in any successful project is gaining a complete understanding of the scope and your clients  needs and desires prior to commencement.  CGA is familiar with the City’s staff and logistics from previous  projects within the City of Sunny Isles Beach and its surrounding areas.  Moreover, CGA has personal  relationships with the City of Sunny Isles Beach, its surrounding municipalities and all Agencies Having  Jurisdiction (AHJ).  These personal relationships allow us to tailor our expertise to your needs, providing an  expedited process which exceeds the City’s expectations.  Once CGA has been issued a Notice to Proceed we will schedule a “kick off” meeting with the City and all  necessary CGA and support staff to discuss the project specific scope of work, and the City’s expectation of  CGA and the selected design build firm.  Immediately following this meeting we will hold an in house  meeting to discuss the project planning, controls and implementation.  Project Planning & Controls   As a result of our previous experience with the City, we are fully aware of the requirements and  expectations of the City in regards to CIP project management.  We also understand that no matter the task  or phase of the project, the best formula for success is control and planning.  Chris Giordano, Assistant  Project Manager on this RFQ, served as the Projects Control Manager for the 3rd largest heavy civil marine  contractor in the US prior to his employment with CGA.  Mr. Giordano utilizes this experience to lay the  foundation of every project with proper planning at the onset, and proper controls throughout the duration  of the project.  This formula has proven successful on many of CGAs Construction Management projects,  which is shown by the delivery of on‐time projects that are completed within budget.  CGA utilizes  Primavera Scheduling or Microsoft Project (varies by client preference), S Curves, cost loading &  estimation, and baselines for both construction progress and construction costs to quickly identify any  portion of the project which needs to be addressed before it can become an issue.  This step commences with our CGA in house meeting.  At this meeting, the scope will be assigned to the  relevant in‐house departments.  A project plan, schedule, and controls will be developed.  After approval by  the City of our schedule and controls, these will be set as the “baseline” for this project.  This baseline will  allow CGA and the City to more accurately monitor the project’s progress.  Communication  CGA staff communicates with our clients on a daily, if not hourly basis in person, via email and phone to  ensure that the client is always kept up to speed and any adjustments that need to be made are completed  quickly.  We also acknowledge the major stakeholder in any CIP project are the residents.  Recently, CGA  has utilized our in‐house Data Development/Creative Design Staff to create a project specific website.   4 Section  RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 4| 2  These sites allow the residents and other stakeholders to access up‐to‐date information in an easy to use  graphical interface 24 hours per day, 7 days per week.  This step will begin immediately with the City, but will not begin with the residents until all information  has been submitted to the City for review and approval prior to becoming public information.  We are  aware of the delicate nature of work being performed within neighborhoods and public right of ways and  would not want to jeopardize the relationship between the City and its residents.  This step will also  continue through project completion.  Project Implementation  CGA will aggressively peruse the completion of each phase of this project.  Again, CGA has a vast experience  with local municipalities and we are aware of the sensitive nature that is CIP budgets & schedules.  Many  stakeholders, residents and elected officials are watching these projects from their homes on a daily basis  and this brings with it extra pressure to perform.  CGA’s main office is located in South Florida and much of  our staff is in the Sunny Isles Beach area on a daily basis.  This will help us facilitate our aggressive  schedule.  Throughout the process weekly progress meetings will be held to ensure that every entity  involved is up to speed and all loose ends are being followed up.   Construction Management and Administration – Per the RFQ, CGA will provide certified and  registered staff that will remain on‐site a minimum of six hours per working day to guide and  administer all construction processes in representation of the City.  These services provide ease of  mind that conflicts will be quickly resolved, surprises will be minimized and final budgeted costs  will be held through to completion.   Meetings and Visits ­ CGA will coordinate and document the following through the overall team:   Pre‐Construction meeting   Value Engineering meetings   Attendance of resident information meetings   Weekly construction meetings   Contract  specific meetings   Specialty A/E Consultant site visits   Equipment start‐ups   Field Inspections ‐ The lead inspector or assistant inspector will document the following on a daily basis:   Weather Conditions   Contractors work force and description of work   Subcontractors on site and work force    All equipment onsite and utilized    Visitors to project site   Tests and results   Construction difficulties and measures taken   Significant delays    Disputes between City, Resident Engineer, or Contractor   Any field directives issued    Record of materials   Summary of field meetings   Any non conforming work   Log of photos taken   MOT Inspections    Request for services during tie‐ins  RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 4| 3  Record Keeping & Project Close Out  CGA has served as a CM representative for numerous South Florida municipalities.  Throughout this time,  we have proven our knowledge of record retention laws, a very important issue for audits and public  record requests.  In fact, the City of Weston felt so highly of our organizational skills and knowledge of  record retention law, we were hired to remove, reorganize and re‐file all of their building department files.   All relevant files will be kept at CGA’s main office where our file room is fire suppressed and our servers are  backed up to an onsite tape as well as an offsite server vault.  This triple redundant system ensures that our  client’s files are never in jeopardy.  At the completion of your project, the City will be presented with a  binder and electronic copy of the project specific files.    Quality Assurance/Quality Control (QA/QC)  CGA is committed to providing Exceptional Solutions through quality services and work products in a  manner that promotes the highest level of freedom from deficiencies while seeking the highest level of  customer satisfaction.  To that end, CGA has developed the structure and dedicated the staff required to  achieve these commitments.  The QA/QC process is completed under the leadership of Jonathan N. Cooper,  PE, CGA’s Director of Quality Assurance.  Mr. Cooper brings over 24 years of engineering and construction  expertise to this task and will custom craft a QA/QC plan specifically designed to meet the needs of this  project.  As Gateway Park is a Construction Management project, a Quality Control Plan will be developed based on  the following guidelines:  QC Plan Development Guidelines for Construction Management  Introduction  A contractor quality control plan (CQCP) is the documentation of the contractor's process for delivering the  level of construction quality required by the contract. This document is intended to provide guidance to  contractors, subcontractors, and suppliers as to what is expected from CQCPs and what the criteria for  accepting and using the requirements for these plans will be.  The CQCP is a framework for the contractor's process for delivering quality construction. The plans and  specifications define the expected results or outcome. The CQCP outlines how those results will be  achieved. While it is not possible to determine from the CQCP whether the level of construction quality will  be acceptable, it is possible to verify that the contractor, as an organization, has addressed the basic  elements of its quality process. These guidelines address not only what should be in the CQCP in order for it  to be acceptable to the City of Sunny Isles Beach, but also what elements the City of Sunny Isles Beach's QA  process needs to have in order to assure quality without usurping the contractor's responsibilities.  Outline of Contractor Quality Control Plan Requirements  a. Process control testing. List the material to be tested, tests to be conducted, the location of sampling,  and the frequency of testing  b. Inspection/control procedures. Address each of the following subjects in each phase of construction:   1. Preparatory phase   a. Review all contract requirements   b. Ensure compliance of component material to the contract requirements   c. Coordinate all submittals including certifications   d. Ensure capability of equipment and personnel to comply with the contract requirements   e. Ensure preliminary testing is accomplished   f. Coordinate surveying and staking of the work   RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 4| 4  2. Startup phase   a. Review the contract requirements with personnel who will perform the work   b. Inspect startup of work   c. Establish standards of workmanship   d. Provide training as necessary   e. Establish detailed testing schedule based on the production schedule   3. Production phase   a. Conduct intermittent or continuous inspection during construction to identify and correct  deficiencies   b. Inspect completed phases before scheduled Government acceptance   c. Provide feedback and system changes to prevent repeated deficiencies   d. Description of records. List the records to be maintained   e. Personnel qualifications   4. Document the name, authority, relevant experience, and qualifications of person with overall  responsibility for the inspection system   5. Document the names, authority, and relevant experience of all personnel directly responsible for  inspection and testing   Plan Development  Unless the contractor already has a documented company QC plan, it may be helpful to discuss what is  required and how detailed it will be. Generally, discussion of the basic who, what, where, when, and how  should comprise three to six pages, with an additional two to four pages of detailed information for each  major category of work. This is not including supplemental materials such as subcontractor/ supplier  plans, certifications, test data, and personnel résumés. Also, if the QC plan contains a lot of repetitions of  contract specifications, meaningless platitudes from quality textbooks, and other fluff, its necessary length  will be longer.  Quality­and the processes that deliver quality­is a somewhat open ended concept. No matter how much detail  is in the plan, it can always be argued that more could be, or should be, included.   Organizational Structure  One of the first issues a contractor or any organization must face when designing its QC/QA procedures, is  how these systems will relate to and impact its organizational structure.  Separate Quality Staff  It is intended that the Gateway Park project be staffed by separate quality staff as deemed necessary by the  Director of Quality assurance.  Testing  Testing provides a reflection of quality and the process. But only changes to the process can improve  quality. Extensive testing needed to identify defects so that they can be corrected is an indication of a poor  process. Ideally, frequencies of QC testing are dependent on characteristics of the overall process. In a  transition environment, however, when contractors are not used to designing comprehensive QC systems,  it may be necessary for the agency to provide guide frequencies to minimize the risk of serious deficiencies  undetected until late in the process.  The type, quantity and/or frequency of testing will be established by the Director of Quality Assurance  prior to the commencement of construction.  This shall be based on the scope of work and the contract  documents and will be subject to refinement as the project proceeds.  RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 4| 5  Defects  Acceptance of defects will be based on the following schedule:   The plan is based on an acceptable of 5 percent defects    If defects rise to 10 percent, that suggests additional process control testing and other actions maybe  indicated, including product removal   If defects rise to 15 percent or higher, this indicates serious process control problems, and the  contractor must modifies the process control procedure to address the problem   In addition to those tests specifically required by the contract, the contractor is required to tabulate in the  CQCP all process control testing which will be necessary to assure that the work and material comply with  the terms of the contract when they are ultimately subjected to quality assurance testing.  Inspection/Control Procedures  The following areas of construction shall be subject to inspection for substantial compliance:   Grading and Drainage   Utility piping   Masonry    Pavement Structure    Permanent Traffic Control    Safety Appurtenances    Seeding and Landscaping    Structures    Temporary Traffic Control   Who, What, Where, When, and How?  For each category and phase of the operation, the QC plan should answer these questions as they relate to  the category and phase:  Who will be responsible for QC during the operation? The Quality Control Technician may be assigned  responsibility for testing and documentation and perhaps even training and monitoring of startup. As the  operation moves toward production, however, foremen or other supervisory personnel will probably be  assigned increasing responsibility. If the management official is too high in the organization‐say the overall  project superintendent‐then it is less likely he/she will have the time to perform detailed QC functions. In  that case, subordinate personnel should be specifically identified.  What will that person do to ensure contract compliance? What authority will the person have over  operations? What portion of the time the operation is in progress will the identified person actually be  present to perform QC responsibilities? Testers and inspectors cannot control quality if their  responsibilities are limited to testing, measuring, and documentation. "What" should address not only  personnel but materials and equipment used in the construction. These items often have stated or implied  contract requirements, and the QC system must verify that those requirements are met.  Where will these activities be performed? Will optional process control testing be performed on‐site or  at a commercial laboratory? Will manufactured materials be inspected at the plant, at the contractor's  facility, or at the site of work? Will the equipment be inspected at the yard, or will inspections be performed  at the site?  When will these activities be performed? The earlier QC activities are performed, the more latitude the  contractor has in dealing with problems. However, when activities are performed too early, there is a risk  of unforeseen changes or glitches prior to actual construction. When will test results be available? This is a  key component of the QC plan that determines largely how responsive it can be to deficiencies.  RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 4| 6  How will inspections be performed? Using a standard checklist? Using the specifications themselves  (quality assurance criteria), etc.? The more generalized and vague the inspection procedures are, the more  likely they will not be consistently effective. However, not having a checklist is not a cause for disapproving  a QC plan unless a checklist is specifically required.  The CQCP should minimize any parroting or paraphrasing of requirements in the contract, and should  avoid simply promising to comply with the contract. These kinds of statements and assurances are of  essentially no added value. The CQCP must go beyond the contract requirements and address the  contractor's organizational process for consistently delivering those requirements.  Subcontractors and Suppliers  When subcontractors and suppliers provide part of the work, then the QCP needs to be clear whether their  QC responsibilities will be independent or a part of the prime contractor's responsibilities. If they are  independent, then the subcontractors or suppliers QCP must be developed and submitted for approval,  through the prime. Otherwise, the prime must address how it will monitor and verify  subcontractor/supplier quality as a part of its plan. In either case the prime is contractually responsible for  all the work, but being contractually responsible is not the same as having an active role in the quality  delivery process.  Manufactured Materials  An important part of the CQCP is the process for verifying that manufactured materials comply with the  requirements of the contract.  Materials inspection will subject to the quantity of materials provided per  category.  Records and Documentation  While good documentation is often a reflection of good quality control, documentation is not the same  thing as quality control. Documentation should be the minimum necessary to concisely document the  adequate function of the process.  As‐built survey documentation will be provided based on the  requirements of the Contract Documents.  Personnel Qualifications  While some contracts may have specific required qualifications for contractor quality control and testing  personnel, the initial judgment as to whether a given person is or is not qualified is generally left to the  contractor. However, during contract administration, CGA may be more assertive in monitoring the  qualifications of these personnel. When the contract has specific experience requirements, the contractor  should describe how the person's previous training and experience addresses these requirements.  Contractor Evaluation  Evaluations are made of five individual elements, plus an overall evaluation:   Quality of Work    Timely Performance    Effectiveness of Management    Compliance With Labor Standards    Compliance With Safety Standards   The first of these five elements, Quality of Work, essentially overlaps the contractor's inspection system  requirements. That is, a contractor that fails to maintain an effective quality control (inspection system)  will generally warrant an unsatisfactory rating in the Quality of Work category. Deficient contractors must  be clearly notified of the deficiencies and provided an opportunity to correct them.  RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 4| 7  Evaluations may be used in part for determinations of responsibility prior to award of sealed bid contracts  or in evaluating past performance as a part of source selection for a negotiated contract.  If the prime contractor's performance would be evaluated as satisfactory but for the performance of a  major subcontractor, it is permissible to execute a separate evaluation of the subcontractor, following the  same rules as if it were a prime.  RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 5| 1  REFERENCES   See following pages for reference letters.     5 Section  Pa g e 5| 2 Page 5| 3 Page 5| 4 Page 5| 5 RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 6| 1  OFFICE LOCATIONS   Calvin, Giordano & Associates has Florida offices located in Fort Lauderdale, West Palm Beach, Port St.  Lucie, Homestead, Clearwater, and Jacksonville and most recently opened in Atlanta, Georgia.  If selected,  CGA’s Fort Lauderdale office located at 1800 Eller Drive, Suite 600, Fort Lauderdale, Florida will be the  responsible office.  OFFICE LOCATION PROVIDIING PRIMARY PROJECT MANAGEMENT   Fort Lauderdale Office  1800 Eller Drive, Suite 600  Fort Lauderdale, Florida 33316  (954) 921‐7781  Point of Contact (POC) for this RFQ: Joel Wadsworth, GC  OTHER OFFICE LOCATIONS   Treasure Coast (WPB Office)  560 Village Boulevard  Suite 340  West Palm Beach, FL 33409  Tel: (561) 684‐6161  POC: Richard Sala  Homestead Office   97 NE 15th Street  Homestead, FL 34590  Tel: (786) 243‐0071    POC: Shelley Eichner, AICP  Tampa Office  2349 Bluewater Way  Clearwater, FL 33759  Tel: (727) 394‐3825    POC: David Healey   Port St. Lucie Office  2400 SE Veterans Memorial  Parkway  Suite 207  Port St Lucie, FL 34952  Tel: (772) 489‐9494  POC: Jeff Maxwell, PE, PTOE  Jacksonville Office  111 Riverside Avenue  Jacksonville, FL 32202  Tel: (904) 834‐4314      POC: George Keller, Jr.  Metro Atlanta Office  Ashford Perimeter  4151 Ashford Dunwoody Rd NE Suite 120  Atlanta, GA 30319  Tel: (678) 252‐1096  POC: George Keller, Jr.  OFFICE LOCATION(S) FOR ANTICIPATED SUB­CONSULTANTS   Masuen Consulting, LLC.  5079 North Dixie Hwy  Suite 323  Oakland Park, FL 33334  Tel: (866) 928‐1533  POC: Todd Mohler, RLA  Pistorino & Alam   Consulting Engineers, Inc.  7171 SW 62nd Avenue, 4th Floor  Miami, Florida 33143  Tel: (305) 669‐2700  POC: Tahir Iqbal, PE      6 Section  RFQ #12‐06‐01, Construction Management Services for Gateway Park Page 7| 1  CONTRACT FORMS   See following pages for the requested contract forms:   • Bid Submittal Forms  • Acknowledgment of Addenda  • Non‐Collusion Affidavit  • Public Entity Crimes  • Equal Opportunity/Affirmative Action Statement  • Conflict of Interest Statement  • Dispute Disclosure Form  • Anti‐Kickback Affidavit  7 Section