Loading...
HomeMy WebLinkAboutReso 2017-2667 RESOLUTION NO. 2017- .7-rdn A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE ORDER NOS. 1 THROUGH 6 RELATING TO THE AGREEMENT WITH ROHL NETWORKS, LP FOR THE UNDERGROUNDING OF UTILITIES ON COLLINS AVENUE AND ATLANTIC BOULEVARD AND FOR THE INSTALLATION OF DECORATIVE LIGHTS AND RELATED EQUIPMENT, IN A TOTAL AMOUNT NOT TO EXCEED FOUR MILLION NINE HUNDRED SIXTY-SEVEN THOUSAND NINE HUNDRED EIGHTY-NINE DOLLARS ($4,967,989.00), ATTACHED HERETO, IN SUBSTANTIALLY THE SAME FORM, AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO SIGN SAID CHANGE ORDERS; AUTHORIZING THE CITY MANAGER AND CITY ATTORNEY TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on February 18th, 2016 via Resolution No. 2016-2525 the City Commission approved an agreement with Rohl Networks, LP ("Contractor"), for the Construction of the Collins Avenue Utility Undergrounding, in an amount of $4,830,000.00, and an owner contingency in the amount of $500,000.00, and an additional contingency in the amount of $1,500,000.00 for additional scope of work for Atlantic Boulevard, for a total amount not to exceed $6,830,000.00; and; WHEREAS, the Contractor has submitted Change Order No. 1 which adds 11,297 lineal feet of conduits as directed by the City; and WHEREAS, the Contractor has submitted Change Order No. 2 for additional concrete removal and conduit placement in Town Center Park; and WHEREAS, the Contractor has submitted Change Order No. 3 to complete miscellaneous below grade improvements on Collins Avenue and 195th Street; and WHEREAS, the Contractor has submitted Change Order No. 4 to complete miscellaneous below grade improvements along the Atlantic Corridor; and WHEREAS, the Contractor has submitted Change Order No. 5 to complete Collins Avenue due to the added scope of work and unforeseen conditions; and WHEREAS, the Contractor has submitted Change Order No. 6 to purchase material for the Collins Avenue Street Light Project; and WHEREAS, staff has determined that additional services beyond the original scope of work is needed to remain on schedule and complete the project; and R2017-COs 1-6 with Rohl Networks for Collins Ave Utility Undergrounding.doc Page 1 of 2 WHEREAS, the City Commission wishes to approve Changer Order Nos. 1 through 6 with Rohl Networks, LP, for the Undergrounding of Utilities on Collins Avenue and Atlantic Boulevard and For The Installation of Decorative Lights and Related Equipment, in an amount not to exceed Four Million Nine Hundred Sixty-Seven Thousand Nine Hundred Eighty-Nine Dollars ($4,967,989.00), bringing the total contract amount not to exceed Eleven Million Seven Hundred Ninety-Seven Thousand Nine Hundred Eighty-Nine Dollars ($11,797,989.00), attached hereto, in substantially the same form, as Exhibit"A". NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA,AS FOLLOWS:. . . Section 1. Approval of Change Order Nos. 1 through 6 to the Agreement. The City Commission hereby approves Changer Order Nos. 1 through 6 with Rohl Networks, LP, for the Undergrounding of Utilities on Collins Avenue and Atlantic Boulevard and For The Installation of Decorative Lights and Related Equipment, in an amount not to exceed Four Million Nine Hundred Sixty-Seven Thousand Nine Hundred Eighty-Nine Dollars ($4,967,989.00), bringing the total contract amount not to exceed Eleven Million Seven Hundred Ninety-Seven Thousand Nine Hundred Eighty-Nine Dollars ($11,797,989.00), attached hereto, in substantially the same form, as Exhibit"A". Section 2. Authorization of City Manager and City Attorney. The City Manager and City Attorney are hereby authorized to do all things necessary to effectuate this Resolution. Section 3. Effective Date. This Resolution shall become effective upon adoption. PASSED AND ADOPTED this 16th day of February 117. George choll, Mayor AT'f ti• 4112W; � . Jane A. Hines, MC, City Clerk Approv-: • to Form and Le .f id/ .11 i' '.ifivot, ity Attorney Moved by: I (Ck 11114 1b12- 60(.,.ryt44 Seconded by: COVN►Y1tSStoNeC- GC& -tr4 Vote: Mayor Scholl `/ (Yes) (No) Vice Mayor Goldman —1—(Yes) (No) Commissioner Aelion- (Yes) (No) Commissioner Gatto ✓ (Yes) (No) Commissioner Svechin V (Yes) (No) R2017-COs 1-6 with Rohl Networks for Collins Ave Utility Undergounding.doc Page 2 of 2 • SUNNY ,S4F o �� CHANGE 6- CITY OF ORDER * ' �`-` — * SUNNY ISLES BEACH ye s * F L O�\ `, P C/?.' OF $UN PI'O AMENDMENT NUMBER: 1 DATE: August 18, 2016 RFP NUMBER: 15-12-02 PROJECT Collins Avenue Utility RESOLUTION NUMBER: Undergrounding Project 17-2667 '" ORIGINAL BASE CONTRACT AMOUNT: $ 6,830,000.00 ORIGINAL CONTINGENCY ALLOWANCE: S 0 ORIGINAL TOTAL CONTRACT AMOUNT: $ 6,830,000.00 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: $ 0 • DOLLAR AMOUNT OF THIS CHANGE ORDER: $ 167,760.00 CREDIT/DIRECT PURCHASES: $ 0 NEW DOLLAR CONTINGENCY AMOUNT: $ 0 NEW DOLLAR CONTRACT AMOUNT: S 6,997,760.00 ORIGINAL CONTRACT COMPLETION DATE March 31, 2017 • , TOTAL OF PREVIOUS CHANGE ORDER DAYS: 0 AMOUNT OF DAYS PER THIS CHANGE ORDER: 0 NEW CONTRACT COMPLETION DATE: March 31, 2017 DESCRIPTION OF SCOPE OR WORK CHANGES: - The Contract is changed as follows: _ . Add 11,297 lineal feet of 2 additional 2" conduits and vaults in center median from Haulover Park to Golden Beach for lighting circuits as directed by Engineering Plans and City of Sunny Isles Beach NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitu a full a d complete settl-ment of the matters set forth herein,including all direct and indirect costs for equipm , man'., er, materials, oRrhead, profit and delay relating to the issues set forth in this document. ll / ROHL NETWORKS: Michael Wiecinski A CITY ATTORNEY: . Hans Ottinot ififfi - PROJECT MANAGER: RI 1 A ; CITY MANAGER: Christopher J. Russo RO H L Proposed Change Order NETWORKS p PROJECT: TO CONTRACTOR: Collins Avenue Utility Undergrounding Rohl Networks City of Sunny Isles Beach 2875 Jupiter Park Dr. STE 900 18070 Collins Ave. Jupiter, FL 33458 Sunny Isles Beach, FL 33160 Change Order Number: 1 Date: August 18, 2016 Architect's Project Number: 15-12-02 Contract Date: February 18, 2016 Contract For: Collins Avenue Utility Undergrounding The Contract is changed as follows: Add 11,297 lineal feet of 2 additional 2" conduits and vaults in center median from Haulover Park to Golden Beach for lighting circuits as directed by Engineering Plans and City of Sunny Isles Beach The original contract sum was: $6,830,000.00 The net change by previously authorized Change Orders: $0 The Contract Sum prior to this Change Order was: $6,830,000.00 The Contract Sum will be increased by this Change Order in the amount of: $167,760 The new Contract Sum, including this Change Order, will be: $6,997,760 The Contract Time will be increased by: 0 Therefore,the date of Substantial Completion as of the date of this Change Order is: March 31,2017 NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. ARCHITECT CONTRACTOR OWNER SIGNATURE SIGNATURE SIGNATURE PRINTED NAME PRINTED NAME PRINTED NAME DATE DATE DATE END OF DOCUMENT OJNNY /SC �S (crB CHANGE ' ' " • CITY OF ORDER * t = # SUNNY ISLES BEACH P tie s�* FL0.- 52 C,). OF SUN PCO AMENDMENT NUMBER: 2 DATE: January 11, 2017 RFP NUMBER: 15-12-02 PROJECT Collins Avenue Utility RESOLUTION NUMBER: Undergrounding Project 17-2667 ORIGINAL BASE CONTRACT AMOUNT: $ 6,830,000.00 - _ - -• - ORIGINAL CONTINGENCY ALLOWANCE: S 0 ORIGINAL TOTAL CONTRACT AMOUNT: $ 6,830,000.00 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: S 167,760.00 DOLLAR AMOUNT OF THIS CHANGE ORDER: 5 105,875.00 CREDIT/DIRECT PURCHASES: $ 0 - NEW DOLLAR CONTINGENCY AMOUNT: $ 0 NEW DOLLAR CONTRACT AMOUNT: $ 7,103,635.00 . ORIGINAL CONTRACT COMPLETION DATE March 31, 2017 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 0 AMOUNT OF DAYS PER THIS CHANGE ORDER: 0 NEW CONTRACT COMPLETION DATE: March 31, 2017 DESCRIPTION OF SCOPE OR WORK CHANGES: The Contract is changed as follows: To increase contract by $105,875.00 to facilitate concrete removal and the placing of conduits in Town Center Park for the City of Sunny Isles Beach. $105,875.00 includes a contingency of $1,000.00 for wind screen on fence and $5,000.00 for.. replacement of sidewalk if required. NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional.general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document con ti to a full and compl--_ settlement of the matters set forth herein, including all direct and indirect costs for equip - t, ma ei.wer, mat:. ials, .verhead, profit and delay relating to the issues set forth in this document. ?' 1\ . . ROHL NETWORKS: Michael Wiecinski 3-/;4_7//? CITY ATTORNEY: Hans Ottinot i,��`� PROJECT MANAGER: - 7' _AFS o �, - CITY MANAGER: Christopher J. Russo RO H Proposed Change Order NETWORKS p PROJECT: TO CONTRACTOR: Collins Avenue Utility Undergrounding Rohl Networks City of Sunny Isles Beach 2875 Jupiter Park Dr. STE 900 18070 Collins Ave. Jupiter, FL 33458 Sunny Isles Beach, FL 33160 Change Order Number: 2 Date: January 11, 2017 Architect's Project Number: 15-12-02 Contract Date: February 18, 2016 Contract For: Collins Avenue Utility Undergrounding The Contract is changed as follows: To increase contract by $105,875.00 to facilitate concrete removal and the placing of conduits in Town Center Park for the City of Sunny Isles Beach. $105,875.00 includes a contingency of$1,000.00 for wind screen on fence and $5,000.00 for replacement of sidewalk if required. The original contract sum was: $6,830,000.00 The net change by previously authorized Change Orders: $167,760 The Contract Sum prior to this Change Order was: $6,997,760 The Contract Sum will be increased by this Change Order in the amount of: $105,875.00 The new Contract Sum, including this Change Order, will be: $7,103,635 The Contract Time will be increased by: 0 Work Days Therefore,the date of Substantial Completion as of the date of this Change Order is: March 31,2017 NOT VALID UNTIL SIGNED BY THE ENGINEER, CONTRACTOR AND OWNER. ENGINEER CONTRACTOR OWNER SIGNATURE SIGNATURE SIGNATURE PRINTED NAME PRINTED NAME PRINTED NAME DATE DATE DATE END OF DOCUMENT O�SVNNY CHANGE CITY OF * _ ORDER * ** SUNNY ISLES BEACH pP P CY OF SUN PCO AMENDMENT NUMBER: 3 DATE: January 12, 2017 RFP NUMBER: 15-12-02 PROJECT Collins Avenue Utility RESOLUTION NUMBER: Undergrounding Project 17-2667 ORIGINAL BASE CONTRACT AMOUNT: $ 6,830,000.00 ORIGINAL CONTINGENCY ALLOWANCE: S 0 ORIGINAL TOTAL CONTRACT AMOUNT: $ 6,830,000.00 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: $ 273,635.00 DOLLAR AMOUNT OF THIS CHANGE ORDER: S 175,000.00 CREDIT/DIRECT PURCHASES: S 0 NEW DOLLAR CONTINGENCY AMOUNT: $ 0 NEW DOLLAR CONTRACT AMOUNT: $ 7,278,635.00 ORIGINAL CONTRACT COMPLETION DATE March 31, 2017 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 0 AMOUNT OF DAYS PER THIS CHANGE ORDER: 0 NEW CONTRACT COMPLETION DATE: March 31, 2017 DESCRIPTION OF SCOPE OR WORK CHANGES: The Contract is changed as follows: To increase contract by $175,000.00 to complete misc. below grade improvements for the City of Sunny Isles Beach at Collins and 195th Street. NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The ' and the Contra•v• .gree that the contract time adjustment and sum agreed to in this document constitut a II and complet: settl_ ent of the matters set forth herein, including all direct and indirect costs for equ4pme t, ma', sower, materials, ove ead, profit and delay relating to the issues set forth in this document. r } I ROHL NETWORKS: Michael Wiecinski 1 4 CITY ATTORNEY: Hans Ottinot 4714 27- 9 PROJECT MANAGER: W -4'"` ` CITY MANAGER: Christopher J. Russo RO H AS Pro osed Chane Order NETWORKS p g PROJECT: TO CONTRACTOR: Collins Avenue Utility Undergrounding Rohl Networks City of Sunny Isles Beach 2875 Jupiter Park Dr. STE 900 18070 Collins Ave. Jupiter, FL 33458 Sunny Isles Beach, FL 33160 Change Order Number: 3 Date: January 12, 2017 Architect's Project Number: 15-12-02 Contract Date: February 18, 2016 Contract For: Collins Avenue Utility Undergrounding The Contract is changed as follows: To increase contract by $175,000.00 to complete misc. below grade improvements for the City of Sunny Isles Beach at Collins and 195th Street. The original contract sum was: $6,830,000.00 The net change by previously authorized Change Orders: $273,635 The Contract Sum prior to this Change Order was: $7,103,635 The Contract Sum will be increased by this Change Order in the amount of: $175,000.00 The new Contract Sum, including this Change Order, will be: $7,278,635 The Contract Time will be increased by: 0 Work Days Therefore,the date of Substantial Completion as of the date of this Change Order is: March 31,2017 NOT VALID UNTIL SIGNED BY THE ENGINEER, CONTRACTOR AND OWNER. ENGINEER CONTRACTOR OWNER SIGNATURE SIGNATURE SIGNATURE PRINTED NAME PRINTED NAME PRINTED NAME DATE DATE DATE END OF DOCUMENT SUNNY j4t -- , 9 CHANGE ,-3 _ = CITY OF * ORDER * ,,:k-c -----,, - SUNNY ISLES BEACH P C/2->- OF SUN N 1 AMENDMENT NUMBER: 4 DATE: January 14, 2017 RFP NUMBER: 15-12-02 PROJECT Collins Avenue Utility RESOLUTION NUMBER: Undergrounding Project 17-2667 ORIGINAL BASE CONTRACT AMOUNT: $ 6,830,000.00 . ORIGINAL CONTINGENCY ALLOWANCE: $ 0 ORIGINAL TOTAL CONTRACT AMOUNT: $ 6,830,000.00 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: _ $ 448,635.00 DOLLAR AMOUNT OF THIS CHANGE ORDER: $ 1,733,040.00 CREDIT/DIRECT PURCHASES: $ 0 NEW DOLLAR CONTINGENCY AMOUNT: $ 0 NEW DOLLAR CONTRACT AMOUNT: $ 9,011,675.00 ORIGINAL CONTRACT COMPLETION DATE March 31, 2017 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 0 AMOUNT OF DAYS PER THIS CHANGE ORDER: 0 NEW CONTRACT COMPLETION DATE: March 31, 2017 DESCRIPTION OF SCOPE OR WORK CHANGES: The Contract is changed as follows: To increase contract.by. $1,733,040.00 to complete misc. below grade improvements for the City of Sunny Isles Beach along the Atlantic corridor. This is an allowance and will be billed at current unit rates per contract with city. NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment andsum agreed to in this document constitute a full and complete settl- -nt of the matters set forth herein, including all direct and indirect costs for eq • ment, man vower, materials, ov:rhe-d, profit and delay relating to the issues set forth in this document. N6ROHL NETWORKS: Michael Wiecinski rpi �f ', _ CITY ATTORNEY: Hans Ottinot 3/),4p--7. lid il _ . PROJECT MANAGER: f! �: CITY MANAGER: Christopher J. Russo • Atlantic Corridor Utility Undergrounding Budget Station 62 thru 100 3800 plus East West from Collins to Atlantic on 175th Terrace 400 East West on 183rd 500 185th thru 191st Station 94.8-114.2 1940 Total Atlantic Corridor 6640 Collins Ave Cost$523/LF Atlantic Cost $261/LF $1,733,040.00 RO H Change Proposed Order p C ge Ode NETWORKS PROJECT: TO CONTRACTOR: Collins Avenue Utility Undergrounding Rohl Networks City of Sunny Isles Beach 2875 Jupiter Park Dr. STE 900 18070 Collins Ave. Jupiter, FL 33458 Sunny Isles Beach, FL 33160 Change Order Number: 4 Date: January 14, 2017 Architect's Project Number: 15-12-02 Contract Date: February 18, 2016 Contract For: Collins Avenue Utility Undergrounding The Contract is changed as follows: To increase contract by $1,733,040.00 to complete misc. below grade improvements for the City of Sunny Isles Beach along the Atlantic corridor. This is an allowance and will be billed at current unit rates per contract with city. The original contract sum was: $6,830,000.00 The net change by previously authorized Change Orders: $448,635 The Contract Sum prior to this Change Order was: $7,278,635 The Contract Sum will be increased by this Change Order in the amount of: $1,733,040.00 The new Contract Sum, including this Change Order,will be: $9,011,675 The Contract Time will be increased by: TBD Work Days Therefore,the date of Substantial Completion as of the date of this Change Order is: TBD NOT VALID UNTIL SIGNED BY THE ENGINEER, CONTRACTOR AND OWNER. ENGINEER CONTRACTOR OWNER SIGNATURE SIGNATURE SIGNATURE PRINTED NAME PRINTED NAME PRINTED NAME DATE DATE DATE END OF DOCUMENT S\) ISzF °� ,, ,: CHANGE • CITY OF * 1----------_--, -_,,,,,,L " Y * SUNNY ISLES BEACH ORDER Q P yF 9?* FLOC\ `'� C/T. OF SUN PCO AMENDMENT NUMBER: 5 DATE: January 14, 2017 RFP NUMBER: 15-12-02 PROJECT Collins Avenue Utility RESOLUTION NUMBER: Undergrounding Project 17-2667 ORIGINAL BASE CONTRACT AMOUNT: $ 6,830,000.00 ORIGINAL CONTINGENCY ALLOWANCE: $ 0 ORIGINAL TOTAL CONTRACT AMOUNT: $ 6,830,000.00 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: $ 2,181,675.00 DOLLAR AMOUNT OF THIS CHANGE ORDER: $ 1,090,114.00 CREDIT/DIRECT PURCHASES: $ 0 NEW DOLLAR CONTINGENCY AMOUNT: $ 0 NEW DOLLAR CONTRACT AMOUNT: $ 10,101,789.00 ORIGINAL CONTRACT COMPLETION DATE March 31, 2017 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 0 AMOUNT OF DAYS PER THIS CHANGE ORDER: 0 NEW CONTRACT COMPLETION DATE: March 31, 2017 DESCRIPTION OF SCOPE OR WORK CHANGES: The Contract is changed as follows: To increase contract by $1,090,114.00 to complete Collins Ave due to added scope of work and unforeseen conditions for the City of Sunny Isles Beach. This is an allowance and will be billed at current unit rates per contract with city. SEE ATTACHED DOCUMENTATION NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, including all direct and indirect costs for eq Went, mar •• -r, materials, •. erhead, profit and delay relating to the issues set forth in this document. . \ ; ROHL NETWORKS: Michael Wiecinski ' Lt ''I\ / _ CITY ATTORNEY: Hans Ottinot / ,/ ., _3/.:29/19 PROJECT MANAGER: Alis "' CITY MANAGER: Christopher J. Russo Collins Undergrounding - Budget Status 12- 1/31/2017 Pay Request Line Item Percent Complete Current Overage Projected Overage OVERAGE 4 8 232.97 $ 1,597 $ 2,203 - 5 9 151.37 $ 3,514 $ 4,849 6 10 233.92 $ 4,423 $ 6,103 7 16 113.15 $ 568 $ 783 8 18 105.05 $ 289 $ 399 9 25 315.5 $ 7,339 $ 10,128 10 29 150 $ 1,450 $ 2,001 11 30 150 $ 1,150 $ 1,587 12 38311.71 $ 12,408 $ 16,627 13 43 216.67 $ 2,102 $ 2,817 14 46 142.11 •$. _?'7:1;346 $ 1,804 15 51 106.5 $ . . ____1,361 $ 1,361 16 56 109.29 $ 7,478 $ 7,478 58 131.06 $ . . 2,805 $ 3,983 17 59 109.35 $ 1,543 $ 1,928 18 63 _ . . _ _ _ 125.67 $ 6,148 $ 8,729 19 ___ .68_..._._.__ _______2882.05 . $ 32,382 # $ 52,847 20 ____69_ ___._ .___220.64 ___ $. .__. . 6,163 $. 10,414 21.. . ..70 .. 157.58 .. $ 596 $ 894 22 751783.7 $ 24,502 $ 24,502 23 76 . .626.09 .. ..$.__,_ . _ __6,988.. $ 6,988 24 77 205.81 _ ._$._ _ ____.11,093 $ _ _ 24,826. _ 25 78646.3 $.- _.5,354 . $ 5,354 26 86 404.18 $ _ ._26,555 $ 26,555 27 87 166.77 $ 7,311 $ 10,949 28 88 117.28 $ 670 $ 670 29 89 342.36 $ ' 13,245 $ 13,245 30 . 93 ._ _ - . _. _ 3113.1 _ $. ._ 497,161 $ 497,161 __.__- 93r- ::._ _ __ ___ 7464.95 $. _ 1,215,218 $ 1,964,698 31 total__ . _ . __ . .. $ 1,902,759 $ 2,711,883 Pay.Request Line Item Percent Complete Current Unused Projected Usage UNDER 34 13 0 $ . --. 1,732 $ - 35 22 0 $ 1,767 $ - 36 23 0 $ ..6,385 $ - 37 24 0 $ 12,162 $ - 38 32 0 $ 13,430 $ - 39 48 0 $ 6,454 $ - 40 73 . 0 $ 2,200 $ - 41 • __ 83' . .. 0 $ 333,000 $ - 42 ... 84_ _ _..- 0 $ 12,450 $ - 43 - 90 . . _ 0 $ 39,846 $ - 44 total $ 429,426 46 Contingency - $ -1,192,343 $ 1,192,343 I I SUMMARY - • Total anticipated line item overages $ 2,711,883 • Total anticipated line item unused $ (429,426) Total remaining contingency to be used $ (1,192,343) (TOTAL ADDITIONAL REQUIRED TO COMPLETE $ 1,090,114 I RO H Proposed Change Order NETWORKS p PROJECT: TO CONTRACTOR: Collins Avenue Utility Undergrounding Rohl Networks City of Sunny Isles Beach 2875 Jupiter Park Dr. STE 900 18070 Collins Ave. Jupiter, FL 33458 Sunny Isles Beach, FL 33160 Change Order Number: 5 Date: January 15, 2017 Architect's Project Number: 15-12-02 Contract Date: February 18, 2016 Contract For: Collins Avenue Utility Undergrounding The Contract is changed as follows: To increase contract by $1,090,114.00 to complete Collins Ave due to added scope of work and unforeseen conditions for the City of Sunny Isles Beach. This is an allowance and will be billed at current unit rates per contract with city. SEE ATTACHED DOCUMENTATION The original contract sum was: $6,830,000.00 The net change by previously authorized Change Orders: $2,181,675 The Contract Sum prior to this Change Order was: $9,011,675 The Contract Sum will be increased by this Change Order in the amount of: $1,090,114.00 The new Contract Sum, including this Change Order, will be: $10,101,789 The Contract Time will be increased by: TBD Work Days Therefore,the date of Substantial Completion as of the date of this Change Order is: TBD NOT VALID UNTIL SIGNED BY THE ENGINEER, CONTRACTOR AND OWNER. ENGINEER CONTRACTOR OWNER SIGNATURE SIGNATURE SIGNATURE PRINTED NAME PRINTED NAME PRINTED NAME DATE DATE DATE END OF DOCUMENT SUNNY 'St, °� � se CHANGE t_____.. CITY OF ORDER ** _ ** SUNNY ISLES BEACH 9 _ ' P yPQO s1* FLO 'P � C/TY OF SUN PC AMENDMENT NUMBER: 6 DATE: January 20, 2017 RFP NUMBER: 15-12-02 PROJECT Collins Avenue Utility RESOLUTION NUMBER: Undergrounding Project 17-2667 ORIGINAL BASE CONTRACT AMOUNT: $ 6,830,000.00 ORIGINAL CONTINGENCY ALLOWANCE: $ 0 ORIGINAL TOTAL CONTRACT AMOUNT: $ 6,830,000.00 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: S 3,271,789.00 DOLLAR AMOUNT OF THIS CHANGE ORDER: S 1,696,200.00 CREDIT/DIRECT PURCHASES: $ 0 NEW DOLLAR CONTINGENCY AMOUNT: $ 0 NEW DOLLAR CONTRACT AMOUNT: $ 11,797,989.00 ORIGINAL CONTRACT COMPLETION DATE March 31, 2017 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 0 AMOUNT OF DAYS PER THIS CHANGE ORDER: 0 "' NEW CONTRACT COMPLETION DATE: March 31, 2017 DESCRIPTION OF SCOPE OR WORK CHANGES: The Contract is changed as follows: To increase contract by $1,696,200.00 to purchase material for Collins Ave Street Light Project for the City of Sunny Isles Beach. This is an allowance and will be billed at current unit rates per contract with city. SEE ATTACHED DOCUMENTATION NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settle •- t of the matters set forth herein, including all direct and indirect costs for eq " m n man-. r, materials, ov: -.•, profit and delay relating to the issues set forth in this document. ROHL NETWORKS: Michael Wiecinskii , CITY ATTORNEY: Hans Ottinot All -- .., , Y/3 /(7-1_ PROJECT MANAGER: ( ® \ \ %, ' ri it, CITY MANAGER: Christopher J. Russo 2017 Purchase of Material Only for Street Lights Description Quantity Cost Total New Pole & Fixture Only 130.00 7,800.00 1,014,000.00 Bases 84.00 3,000.00 252,000.00 Electric Service to New (Allowance) 86,000.00 Existing Base Modification (Allowance) 20,000.00 FPL Service,Point (Allowance)_; = y; 40,000.00 Sub Total 1,412,000.00 Contingency 10% 141,200.00 Total 2017 1,553,200.00 2018 Description Quantity Cost Total Install New Poles and Fixtures 130.00 1,000.00 130,000.00 Sub Total 130,000.00 Contingency 10% 13,000.00 Total 2018 143,000.00 Total for Street Lighting Project 1,696,200.00 ® RO H Proposed Change Order NETWORKS p PROJECT: TO CONTRACTOR: Collins Avenue Utility Undergrounding Rohl Networks City of Sunny Isles Beach 2875 Jupiter Park Dr. STE 900 18070 Collins Ave. Jupiter, FL 33458 Sunny Isles Beach, FL 33160 Change Order Number: 6 Date: January 20, 2017 Architect's Project Number: 15-12-02 Contract Date: February 18, 2016 Contract For: Collins Avenue Utility Undergrounding The Contract is changed as follows: To increase contract by $1,696,200.00 to purchase material for Collins Ave Street Light Project for the City of Sunny Isles Beach. This is an allowance and will be billed at current unit rates per contract with city. SEE ATTACHED DOCUMENTATION The original contract sum was: $6,830,000.00 The net change by previously authorized Change Orders: $3,271,789 The Contract Sum prior to this Change Order was: $10,101,789 The Contract Sum will be increased by this Change Order in the amount of: $1,839,200.00 The new Contract Sum, including this Change Order,will be: $11,797,989 The Contract Time will be increased by: 0 Work Days Therefore,the date of Substantial Completion as of the date of this Change Order is: March 31,2017 NOT VALID UNTIL SIGNED BY THE ENGINEER, CONTRACTOR AND OWNER. ENGINEER CONTRACTOR OWNER SIGNATURE SIGNATURE SIGNATURE PRINTED NAME PRINTED NAME PRINTED NAME DATE DATE DATE END OF DOCUMENT il"yY `3t City of Sunny Isles Beach FS. —� Fr ,t,, � x F 18070 Collins Avenue "t _ Sunny Isles Beach, Florida 33160 ,-- yP s9,Y `� %*P,F' (305)947-0606 City Hall (305)949-3113 Fax c, q rr qc g•,y is ,,. MEMORANDUM TO: The Honorable Mayor and City Commission FROM: Christopher J. Russo, City Manager DATE: 2/16/2017 Approving Additional of Scope Work for the Utility RE: Undergrounding and Street Lighting along Collins Avenue and Atlantic Boulevard RECOMMENDATION: This Resolution is presented for your consideration. REASONS: As presented by City staff at the City workshop held January 19, 2017: 1. In order to maintain an on schedule completion of the Collins Avenue Utility Undergrounding project, certain procedures including demolition, reworking of conduit and use of flowable fill concrete is required to be implemented in the project resulting in an eighty-three (83) day time savings and additional scope of work to place conduit for City use along 195th Street and Collins Avenue along with the associated restoration of pavement and the installation for the balance of the street lighting post, FDOT "RRR". The total amount of this additional work is $1,681,749. 2. Design has been finalized by City consultants and utility providers to facilitate the undergrounding of utilities along Atlantic Boulevard similar to the Collins Avenue project. Scope will include excavation, conduit placement, restoration of roadways, sidewalks and landscaping. The total amount of this additional work is $1,733,040. 3. The City is in agreement with the County and FDOT will be replacing 364 all of the antiquated aluminum and wood pole mounted "cobra head" street lighting with decorative fixtures currently in use in limited areas along Collins Avenue. The fixtures will include outlets for future decorations, as well as decorative brackets for holding banners. The project was originally intended to follow the FDOT Resurfacing, Restoration and Rehabilitation ("RRR") pavement project and the final phase of the Utility Undergrounding on Collins. City staff has been able to determine the feasibility of moving ahead with eighty percent (80%) of the project immediately preceding the FDOT project with the final twenty percent (20%) remaining upon completion of the overhead wiring removal. Purchasing all of the material for the project at this time and storing until installation is available will result in further overall project cost savings.A portion of this project will be funded by FDOT through a Departmental Funding Agreement (DFA)with the City. Due to the timing restrictions of the "RRR", proceeding prior to the finalization of the DFA is recommended. The total amount of this additional work is $1,553,200. ATTACHMENTS: Description Resolution Change Order Nos. 1-6 Item Number: 10.K. 365