HomeMy WebLinkAboutReso 2012-1942RESOLUTION NO. 2012 - 9 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE ORDER NO.6 TO AGREEMENT WITH SHORELINE FOUNDATION, INC. FOR THE NEWPORT FISHING PIER DEMOLITION AND CONSTRUCTION PROJECT, INCREASING THE AGREEMENT BY THIRTEEN THOUSAND TWO HUNDRED NINETY -EIGHT DOLLARS AND FORTY -SIX CENTS ($13,298.46), FOR THE INSTALLION OF EIGHT (8) 18" ROUND AUGER CAST PILES, AND INCREASING THE CONTRACT TIME BY FIFTEEN (15) DAYS, ATTACHED HERETO AS EXHIBIT "A "; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on September 16, 2010 via Resolution No. 2010 -1605, the City Commission approved an Agreement with Shoreline Foundation, Inc. to provide professional construction services for the demolition and construction of the Historic Sunny Isles Beach/Newport Fishing Pier at Pier Park, in an amount not to exceed Three Million Seven Hundred Seventy -Seven Thousand Eight Hundred Sixty -Six Dollars ($3,777,866.00); and WHEREAS, on June 21, 2012 via Resolution No. 2012 -1927 the City Commission approved Change Order Numbers 1 -4 with Shoreline Foundation, Inc., decreasing the Agreement amount by Eight Hundred Eighteen Thousand One Hundred Fifty -Eight Dollars and Seventy -Nine Cents ($818,158.79), bringing the total Agreement amount not to exceed to Two Million Nine Hundred Fifty -Nine Thousand Seven Hundred Seven Dollars and Twenty -One Cents ($2,959,707.21); and WHEREAS, on June 21, 2012 via Resolution No. 2012 -1928 the City Commission approved Change Order No. 5 with Shoreline Foundation, Inc., increasing the Agreement in an amount not to exceed Thirty-Seven Thousand Six Hundred Five Dollars ($37,605.00), bringing the total amount not to exceed to Two Million Nine Hundred Ninety -Seven Thousand Three Hundred Twelve Dollars and Twenty -One Cents ($2,997,312.21). WHEREAS, the original contract plans for the approach slab to the restaurant building called for six (6) 24" x 24" precast piles at a cost of $43,795.64, to be driven via diesel hammer and would require temporary encroachment onto LaPerla property and would have the potential for cracking/spalling of the deck/structure due to vibrations; and WHEREAS, the revised plan relocates the piles, reduces their size and utilizes in installation methodology which reduces vibrations, and due to the smaller size of these piles, the number of piles required to support the structure is increased from six (6) to eight (8); and WHEREAS, the change order for installing eight (8) 18" round auger cast piles was not considered in the original contract and is resulting in Change Order No. 6 increasing the Agreement in an amount not to exceed Thirteen Thousand Two Hundred Ninety -Eight Dollars and Forty -Six Cents ($13,298.46), and increasing the contract time by fifteen (15) days; and 82012- Shoreline CO 6 Pier Page I of 2 WHEREAS, the City wishes to approve Change Order No. 6 with Shoreline Foundation, Inc., increasing the Agreement in an amount not to exceed Thirteen Thousand Two Hundred Ninety- Eight Dollars and Forty -Six Cents ($13,298.46); attached hereto as Exhibit "A ", bringing the total amount not to exceed to Three Million Ten Thousand Six Hundred Ten Dollars and Sixty -Seven Cents ($3,010,610.67). NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Change Order No. 6. The City Commission hereby approves Change Order No. 6 to the Agreement with Shoreline Foundation, Inc., in an amount not to exceed Thirteen Thousand Two Hundred Ninety -Eight Dollars and Forty -Six Cents ($13,298.46), and increasing the contract time by fifteen (15) days, attached hereto as Exhibit "A ", bringing the total amount not to exceed to Three Million Ten Thousand Six Hundred Ten Dollars and Sixty -Seven Cents ($3,010,610.67). Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 3. Effective Date. This Resolution will become effective upon adoption. PASSED AND ADOPTED this 19`h day of July 2012. ATTEST: Jane A. Hines, CMC, City Clerk APPROVED AS TO FORM AND hEGIV.,,,SUFFICIENCY: City Attorney t SC�{OLI, 79"'6t, Moved by: r Seconded by: �1cQ V y ` 41�t.�1(Z Vote: S� O Mayor Edelcup _(Yes) (No) Vice Mayor Thaler /(Yes) (No) Commissioner Aelion ✓(Yes) (No) Commissioner Gatto (Yes) (No) Commissioner Scholl ,/(Yes) (No) 82012- Shoreline CO 6 Pier Page 2 of 2 DATE OF 155UAPdCa: / /'I U'I L r-rr Gli I I V C Lim 1 G. 11 141 1 G OWNER: City of Sunny Isles Beach OWNER CONTRACT NO.: 10 -07 -02 CONTRACTOR: Shoreline Foundation, Inc ENGINEER CONTRACT NO.: 11 -4239 ENGINEER: Calvin, Giordano & Associates, Inc. You are directed to make the following changes in the Contract Documents Description: F &I eight (8) Augercast piles per plan revisions - Remove six (6) Driven piles CO is result of net difference Reason for Change Order: Plan Revisions attachments: CGA Memo Dated 7!2112 incl Attachment "A" & CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times $3,777.866.00 Substantial Completion: 330 calendar days Ready for final payment; 360 calendar days days or dates Net changes from previous Change Orders No. -0- No. -5- Net change from previous Change Orders No. -0- No. -5- $ 1780.553.791 0 days Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: 330 calendar days $2:997.312.21 Ready for final payment: 360 calendar days days or dates Net increase of this Change Order Net Increase of this Change Order $13.298.46 15 days Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: 345 calendar days $3:010,610.67 Ready for final payment: 375 calendar days days or dates RECOMMENDED: By: Joel Wadsworth Calvin. Giordano & Associates. Inc. Date: APPROVED: ACCEPTED: By: By ec io City of Sunny Isles Beach /Date: foreline Foundation, Inc. Date: `°f G�.,.iod- anoeE6t�s,.�j E% E P,T I! N AL S;O L ll T 1 O N g�lj1 Furt Eauder4ale Office 1800 Ellet Drive, Suite 600, Fort I.auderdale, Florida 33316 P11- :154 -.. - 1:7791 r 'VAX,•9502 -r Memorandum 8( i T Pa1gi Beach Office : 560 Village Blvd, Sulto 340, West Patin Beachl Florida:33409 . Pho0g,.561184.61gI. • rhx:561.PO4.6300 j 017 2112 , TIO: Chief Maas, Acting City Manager 1 r 0M: ChrisiGiordano.. Project Manager _.._.- ........:1......_.a ...i 81 MJI CT: ; Status/Progress Update i P�,OJuCT. Newport Fishing Pier C: Sheila Marquez' Executive Assistant to the City Manager Mans Ottinot, City Attorney Minal Shah, Assitant City Manager /Finance Division Dennis Giordano, President Joel Wadsworth, Project Manager Chief Maas: Per Mr. Ottinot's email dated July 2, 2012, please find below a report regarding the attached change order which I discussed with Mr. Ottinot last week: Reasons the modification from the original contract work was required: The original contract plans for the approach slab to the restaurant building called for six (6)- 24" x 24" precast piles to be driven via diesel hammer. The location of these piles is shown in the diagram below; please note the proximity to the existing condo pool and deck: 1\CGAFSONPROJECTAPROJECTSi201 11114239 NEWPORT FIS14ING P1ER\CONSTRUCTION \CORRCSPONDENCc\MFMO 20120702 AUGERCAST PILE CO, DOC As you can see from the diagram above, the location and area of the 24" x 24" precast driven piles would require temporary encroachment onto La Perla property and would have the potential for cracking /spalling of the deck /structure due to vibrations. The revised plan, as shown below, relocates the piles, reduces their size and utilizes an installation methodology which reduces vibrations. Due to the smaller size of these piles, the number of piles required to support the structure is increased from six (6) to eight (8). Deductive Change Order (Credit) for not installing six (6) -24" x 24" Precast Driven Piles: The originally contracted 24" x 24" precast driven piles have an established rate per LF as shown in the contract documents. The breakdown of these costs is shown in Attachment "A" and total to a credit to the contract of $43,795.64. Additive Change Order (Increase) for installing eight (8) —18" round auger cast piles: This scope of work was not originally contemplated in the original contract, thus there is no set value contained in the contractual documents. Attachment "B" contains Shoreline Foundation, Inc (SFI) breakdown of the change order request which totals, $57,094.10. CGA staff has reviewed these change orders with City Staff and a determination was made that the net increase of $13,298.46 is justified in order to minimize the potential impacts to the adjacent existing structures while utilizing the same contractor /contract documents, which ensures that the bonding and insurance is upheld and consistent throughout the project and contractual warranty period. \\CGAFS01 \PR01EC'hPROJECrS\2011\114239 NEWPORT FISHING PIER�CONSTRUCfION\CORRFSPONDENCE \MEMO 20120702 AUGERCAST PILE CO.DOC If you have any questions or would like to discuss this further, please do not hesitate to contact me. Project Manager \\ CGAESI) 1\ PROJE .C'I' \PItOJEC'I'S\2011\114239 NEWPORT F[SHING PIER \CONSTRUCTION \CORRESPONDENCE \MEMO 20120702 AUGERCAST PILE CO.DOC ATTACHMENT "A" uy 2781 SW 161" Avenue . Pembroke Paris, Florlde 33023 Phone: (954) 985.0460 • Fax: (954) 9£15-0402 . www ,sliorelinefotinClation.00trt January 22,2012 JOEL WADSWORTH Project Mtutager (B:roward) Cnivin, Giordauo fie Associates, lne. 1900 Eller Drive, Suite 600 Trott Ltntdenialc, Florida 33316 Re: Sunny isles Bench /Newport Fishing PierPark- Proposal No, 10 -07 -02 Subject: Credit Fen• Six (06) - 24" Prestressed Concrete Piles for Bents R1, R la, R1 b & R2 tit Newport Pier Project. Dear Mr. Wadsworth: ShorclItic Foundation, [tic, is Pleased to provide our civ -diI as per our bid documents ror six (06) - 24" Prt:stressed Concrete Piles at Bents R 1, R I it, Rib & R2 fit No%gjort Pier Project. The Totul Credit is $ 43,795,64, as describe below: No, ilems De eriplion Unit Q110111-ily Unit Cost Sub Total I Pile .Longthnt0ent.R1-- 4BAX43.00' LF 86100 $142.00* $12,212,00 2 Pile. Lcn th at Dent Rla - - -1 EA X 41.21' — - LF 41.21 5.142,00 $5,851.82 3 P.ilar.Len th tit Bont Rlb - - -.I EA X41,21' LF 41.21 $142 -00 $5,851,82 4 Pilo Length at Bent R2- - - -2EA X70',00' _ LF 140.00 $142..00 $19,A0.00 Sub `t'ohal $43,795.64 (,Moral Conn-actor OVOICnd & Pro lit _ lnehulcKl Grand Total = $tt3 "195,64 *Per SFl Schedule of Values 'flank you for your Consideration. Respectfully Submitted, SHORELINE FOUNDATION, INC, Jae -aid Kartunat Prclject Manager Marnbors of: Doop 1=oundalton1n8tifuto .Kiln Drivors Contractors As,tociation . CASF ATTACHMENT 11B" &Si I FL ^i ttf,.4 1 2781 S.W. 66"' Avoluto . P9mbroko Park, Florida 33023 Phone. (9,154) 985 -0450 . Fax: (954) 986 -0462 - www.shorellnOfoltrtclation.com Jtnc 14, 201.2 JOEL WADSWORTH Project lblatlager (Browaml) Calvin, Giordano & Associates, Inc. 1 SOO .filler Drive, Sltite 000 Fort Lnudcixlulc, Florida 333I-b Re: Sunny Isles Beach/Newpot.Fishing, Pier Park- Proposal No. 10- 07_ { }2 Subject: Change Ordcr No, 26Rcv -2 Cost frol)osal for light (08) - 40' -0" Long, 18" Diameler Augcreast Piles for Bents RI, RI a, Rlb & 10 Dear IMr. Wadsworth: Shorcl ale Foundation, hie. (SFI) is plensed to jimsunt our revised cost proposal for Change Order No 2.6. Muse nmvt this linter as our response to Provide cost proposal for (08) -X40' Long, 18" diameter al►l;ereast p1le for Bents R 1, R it, RI It & R2. The price for this change order proposal is $57,094, 10. 'flu labor cost rot' Blovated Colnnn shown in the suln.11lary sheet (if C.O.Itev- ldated April, 1901, 2012 is not correct. For sonic reason this cost has been carried out in Rev -1 rrom i", submission of tlic chlingo order. This cost has been removed in Rev -2 of the change order. 13dom, is the change or(Icr sn:inllalry. See amubcd Exhibits -"A ", I'D", "C ", "n ", & "L" for Scope of Work .St Pricing. T 1 e Re Neste 1,., The above scope of worts will involve ftRecn (15) additional work (lays. Accordingly, BFI is requesting it 111110 crtensiaa of Hficen (15) Work days ill conjunction with thisproposal. No'rE 9 It SFl would like to requost City of sunny Isle .t3.ench it) review our revised cllangc order and make Ilse decision Wore nugereast pile hista It'll ioil fulls It) critical petit. S171 is offcritlg their best and final offer in (Ills revised Change order. Nowevcr, if Iho City decl(l.Cs to engage tiny other contractor to Install 1110 augercilst pills, umplion stilted In our letter dated May 25, 2.012 regarding subject uluinge ordci will apply. Plcnsc.scc attaclicsl catty of letter for your calweniellcc. NOT1? It 2: Third party cerlltied inspection S" Jogging of piles huvc not been included in the chunwo order Cost. In order to provide the cost, SFi requires complete detail for the inspection & certification required by the City. 'rllnnk You far your consideration. R.especlikilly Submitted, SHORE, LINE FOUNDATION, INC. Jawn K irnnlat Project Manager Members of: beep Foundation Institute - P11a, Drivers Contractors Association - CASF �� Project: Newport Fishing Pier- Augarcast Piles Owner Contract No. Owner: Data: Jane 14, .2012 MUM rm Location: Augercast Piles for Restaurant Building, SFI Contract No. M10 -443 (Exhibit -A) Contractor; Shoreline Foundation, Inc. 2781 SW 56 Ave Pembroke Park, Florida 33023 (REVISED) WORK 11 0131FICATION REQUEST Description Type Unit of Maas. units Unit Cost Labor Equipment Matorial Moir Description of additional work, SUMMARY '(REVISED WORMATION) Equipment Cost E us 1 $21.02.90 21,502.96 Mobilization Cost H us 1 $10,000100 $10,000,00 Material Cost M US 1 $12,631.70 $12,531.79 Augorcast Labor Cost L US 1 $12,099.35 $12,999.3b *3rd PartyEnglneering ( Inspections /Pile Log Etc.) 5 TOD TBD TBD TBD TBD T13D Subtotal $12,999,35 $21.662.90 $12,531:79 $10,000,00 Subtotal $57,094.10 $0.00 Total $67,094.10 Project; Newport Fishing Pier- AupnmASt Pilao Owner Contract No. l _,l 1 -" • a Owner: -1 'N • :i=ce Date: June 14, 2012 Location: Augercast Piles for Restaurant Bullding. SFl Contract No. M10 -443 (Exhibit -F!) Contractor: Shoreline Foundation, Inc, 2781 SW 56 Ave Pembroke Park, Florida 33023 (REVISED) WORK MODIFICATION REQUEST Description Type Unit of MQas Unite Unit Cost wloperating expense Labor Equipment Matorial Sub -Cent, ALL EQUIPMENT COSTS FOR AUGERCAST PILING ACTIVITIES "(REVISED INFORMATION) Equipment Cost I-Mbelt L81 38 LS SERIES Crane (80 Ton) E Mhrs 40.00 $238.76 0470,00 *Llnkbeff LS160 SERIES EKCAVATO E Mhrs 40,00 $57.65 23116,00 Ape 75 Drlil & Motor E Mhrs 40.00 $102.24 4089.60 Leads for Drilling equipment E Mhrs 40.00 $7.96 318.40 18 inch Flighting E Mhrs 40.00 $24.65 986.00 Welding Machino & Misc. Rigging E Mhrs 40,00 $20,00 600.00 Standard Grout Purnp (Pilo Bottoms) E Mhrs 40,00 $24,61 080.40 Subtotal $0,00 $18,7b0.40 $0,00 $0.00 Subtotal $18,750.40 Marls -Up (16 %) $2,812.56 Total $21,56196 Page 1 of 1 Project: !Newport Fishing Pier- Augereast Piles Owner Contract No, Owner: Date: June 14, 2012 t� SFI Contract Location: Augercast Piles foi• Restaurant Builcling, SFI Contract No, M10 -443 (Exhibit -C) Contractor: Shoreline Foundation, Inc. 2781 SW 66 Ave Pembroke Park, Florida 33023 WORK MODIFICATION REQUEs"r Description •ryl)o Unit of Was, units unit Cost Re- drives CRANE MOBILIZATION - (REVISED INFORMATION) Additbonal Mobilization Costs *Mobil /zatlon In Mobe LS 1.00 $5,000,00 *De- mobilization Out Mobe LS 1.04 $5,000.00 Subtotal $0.00 Subtotal $10,000,00 Mark -Up ( 00.00 %) $0.00' Total $10,000.00 Project: Newport Fishing Plor- Augercast Mlles Owner Contract No, Owner: �w �:: Date: June 14, 2012 + Location Augereast Piles for Restaurant Building, SFI Contract No, M10 -443 (Exhibit -D) Contractor: Sh.orolin4 Foundation, Inc, 2761 SW 56 Ave Pembroke Park, Florida 33023 (REVISED) WORK MODIFICATION REQUEST Doscription TYBo Ur71t of Maas. Units Unit Cost Labor Equq>ment Matorlal Sub -Cant, MATERIAL COST FOR RIGHT (8) 18 "X40- I -ONG AUGERCAST PILES "(Ri~VISED INf ORMATION) Material Cost Concrete/Grout M CY 34.00 $108.00 3672,00 Rebar M TONS 4.10 $909.32 3728.21 Tie & Place Rebar M TONS 4.10 $450,00 1845.00 Safety Caps /ContralizerslTEos & Accessories M LS 1.00 $256,00 269;00 *Sonatobe M LF 60.00 $14.20 862,00 Lumber M L/S 1,00 $470.00 479.00 HDW'E and fasteners M 1.15 1.00 $95,00 05.00 Subtotal $0.00 $0.00 $9,0.52_.21 $1,045.00 Subtotal $10,897.2.1 Mark -Up (15 %) $1,634,•58 Total $12,531.79 Page 1 of 1 h(ojecl; Newport Fishing Pler- Augorcasl Piles SFI Conlrocl No. M10 -443 (Exltlblt •E) Owner Contract No, Owner: v Contractor: Shoreline I "oundation, hic. 2781 SW 88 Ave Date: Juno 14, 2012 Pembroke Park, Florlda 33023 Location: Auderctrst Piles for Restaurant Rultding, Worst Modification Request pascriplian Typo Unit of Maas, RoUular Flours Overtime Hours ReOular Wa.goiRate Overtime WagetRate Total Burden % Rogular Hours Labor Cost Overtlnre Hours Labor Cost Total Labor Cost LABOR COST TO INSTALL AUG ERCAST PILES ` (REVISED INFORMATION) Augercast Labor Cost *Job supwIniondollf L Mrs 0.00 010 M,20 $40:80 44,20% S $ $ Cran.e.Oparator L Mrs 40.00 0.0 $57.45 $56,10 14.20% $ 2,160.12 $ $ 2,160.12 Equipment Operator L Mhrs 40.00 0.0 $26:80 $38.70 44,20% $ 1,488,14 $ $ 1,488.14 Concrete Pump Operator L Mhrs 40.00 0.0 $24.70 $37.05 44.20% $ 11,424.70 $ $ 5,424,70 Form Carpenter L Mhrs 40.00 0.0 $24.70 $37,06 44.20% $ 1,424.70 S $ 1,424.70 Pile Driving Foreman L Mhrs 40.00 0,0 $28.00 $42.00 50.08% $ 1,600.00 $ $ 1,680.go Pile Dove Jour(royntan I Skilled Laborers L Mrs 40.00 0.0 $18.00 $27.00 54.53% $ 1,112.42 $ $ 1,112.62 Pile Drive Journeyman 1 Skilled Laborer 2' L Mrs 49.00 0.0 $18,00 27. $00 84 63% $ 1,112.62 $ $ 1,112.82 Piles Layout & As- bullts (81rb- Contract) L LS 1.00 0.0 0.0 0.0 0,0 V 010 OA $ 500.00 S - $ SU1)totpl $10,403:78 $0.00 $11,303.78 Sublote) $11,303.78 Mark -Up (16,0 %) $1,QrJG,67 Total $12,999.35 c,r� of su!+ Ha City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 (305) 947 -0606 City Hall (305) 949 -3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission FROM: Chief Fred A. Mass, Acting City Manager DATE: 7/19/2012 RE: Shoreline Foundation, Inc Construction Change Order #6 for the Newport Pier Project RECOMMENDATION: It is recommended that the attached Resolution be approved. REASONS: The original contract plans for the approach slab to the restaurant building called for six (6) 24 "x24" precast piles at a price of $43,795.64 to be driven via diesel hammer ane would require temporary encroachment onto LaPerla property. This would have the potential for cracking /spalling of the deck/structure due to vibration. The revised plar relocates the piles, reduces their size and utilizes in installation methodology whicl• reduces vibrations, and due to the smaller size of these piles, the number of piles requires to support the structure is increased from six (6) to eight (8).The change order fol installing eight (8) 18" round auger cast piles was not considered in the original contract and is resulting in Change Order No. 6 increasing the Agreement in an amount not tc exceed $13,298.46. Please note that this Change Order increases the contract time by fifteen (15) days. A report prepared by Calvin Giordano is attached. FUNDING SOURCE: Funding is available in account number 20- 600 -5670. ATTACHMENTS: Resolution Change Order No. 6 Agenda Item No. IOL\nDate 7/19/2012 187