Loading...
HomeMy WebLinkAboutRFC 3 Request for Clarification No. 3 CITY OF SUNNY ISLES BEACH CONSTRUCTION OF WALL UNDER THE WILLIAM LEHMAN CAUSEWAY CITY RFP NO.13-10-02 To All Bidders: Bidders for the above referenced project shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise.  Questions/Clarifications: 1. Is the lateral load of 4.8 k and vertical load of 0.8 kip per foot of footing a breakdown of the factored moment of 42.24 k-ft? Or does the 42.24 k-ft overturn need to be broken down into a vertical and lateral load in addition to the 11 KIP service capacity and 4.8 k lateral load? Response: The moment of 42.24 k-ft at the top of pile is due to a lateral load of 4.8 kips gross for overturning. Contractor needs to take into consideration the weight of the wall and footing to obtain the net overturning moment 2. On Sheet S3, at matchline “A”, drawing indicates total wall length as 923.88’. Based on the station marker where the wall starts at 184+33.83 and ends at the bulk head at 172+31.66, this is roughly about 1,202LF. Please advise if that note “923.88 Total” note is incorrect. Response: The length of the wall is 1204.5 LF END OF SECTION