HomeMy WebLinkAboutRFC 2 Request for Clarification No. 2 CITY OF SUNNY ISLES BEACH ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT CITY RFP NO. 14-04-01 To All Bidders: Bidders for the above referenced project shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise.  Questions/Clarifications: 1. Section 2.12 states that the proposer shall furnish adequate supervision. Please define “adequate” supervision. Is it the City’s intention to have a full time Superintendent and Project Manager? Response: The Proposer provide shall provide staffing and resources as they deem fit to ensure that the project is completed in accordance with the contract documents/specification, contract terms and schedule. 2. Section 2.13 states that all unusable material and debris shall be removed from premises at the end of each workday. a. Please define unusable material and debris. b. Will stock piling of demo material or fill be allowed over night? Response: a. “Unusable material” refers to any substance unsuitable to be incorporated in the work as described in RFP No 14-04-01. b. Stock piling of discarded material will not be permitted overnight. Contractor shall ensure that stockpiling of all surplus materials, equipment, usable forms etc be limited to dedicated staging areas. The City accepts no liability for any loss of materials, by theft or otherwise, or for any damage to the stored materials. The site directly abuts a residential community, and as such should be maintained in a clean and orderly manner throughout the entire length of work under this Contract. Contractor shall not dispose of materials of any character, rubbish or equipment, on abutting property or public right-of-way, with or without the consent of the property owners. Request for Clarification No. 2 ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT CITY RFP NO. 14-04-01 3. Section 2.21 states that the proposer shall obtain and pay for all licenses, permits and inspection fees required for this project. a. It is not clear as to who will be responsible for the cost associated with densities. b. If the proposer is responsible please provide information as to how many densities will be required by the City for sidewalk and footers/wall. Response: a. All fees associated with this project, including but not limited to densities shall be the sole responsibility of the contractor. Proposer shall also be aware that the execution of a Certified Maintenance of Traffic Plan (MOT) may require off-duty City of Sunny Isles Beach Police Officer(s) and FDOT Certified Flagman/Flagmen, the cost of which will be the sole responsibility of the successful Proposer. b. The contractor will be required to submit certified copies of density tests prior to concrete/paver placement. All testing shall be completed and meet minimum density requirements on each lift prior to additional backfilling. Horizontal distribution of density testing shall be as follows Subgrade: Tests shall be performed at randomly selected locations within each 200-ft interval (max) along the length of the sidewalk for each lift of fill (12” max). Base: Tests shall be performed at randomly selected locations within each 200- ft interval (max) along the length of the sidewalk for each lift of fill (12” max). Contractors shall also be required to submit copies of batch tickets for 3000 PSI concrete batch samples. 4. Section 3.1 paragraph 2 speaks of the removal and reinstallation of existing trash receptacles, bus shelters, and other existing elements. a. Will the City be temporarily storing these elements when removed to perform the improvements? b. It was observed that some of these existing elements are rusting and have some existing damage. What measures will be taken to assure that the selected contractor is not held responsible for the existing damage? Response: a. The contractor may temporarily store these elements within the Public Works facility located beneath the William Lehman Causeway for the duration of the project. The contractor will be responsible for transferring these elements to and from the storage facility. b. Prior to construction, the contractor shall document the condition of existing of the elements specified above through photo/video logs to be submitted to the City before commencing on-site activities. Add alternates have been provided in the bid form to account for any additional costs associated with the replacement of some of the 2 Request for Clarification No. 2 ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT CITY RFP NO. 14-04-01 existing elements, if required to facilitate reinstallation. It is assumed that replacement of the existing bus shelter will not be required. 5. Will a permit be required for the temporary fence? Response: Yes. A building permit will be required for the temporary construction fence. The successful contractor will be required to submit plans, details and the pertinent applications to the City building department for review and approval prior to the start of work. 6. Please clarify the difference between Line Item #5 and Line Item #6 Response: All Bidders are directed to eliminate item #5 – Furnish and Install temporary 6-ft tall security fence along the Arlen House property. Bid item #6 – Temporary construction fencing shall include ALL temporary fencing required for the project duration, including security fencing along the Arlen House limits. 7. Line Item #18 is a Lump Sum about for Existing Utility Investigation of Project Limits. (Private and Public) Will the City require this information to be added on the As-Builts? Response: Yes. The contractor will be required to depict this information on the final project as-builts, in accordance with the as-built requirements outlined in the bid specifications. 8. Line Item #19 – Turnout Construction; please confirm this line item is for the restoration of the proposed staging area on Bayview Drive. The line item does not call for the restoration of the existing striping within the proposed staging area. Response: This line item refers to the construction of the vehicular access drive to the Arlen House property. Bidders are directed to line item 80 – Mill and Resurface of Bayview Drive from Collins Ave to guard house, for restoration of Bayview Drive. 3 Request for Clarification No. 2 ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT CITY RFP NO. 14-04-01 9. Line Item #21 through 23 appears to be for the proposed striping on the Collins Avenue driveway entrance. The plans illustrate a right hand turn arrow but there is no line item for the arrow. Response: Line item #21A has been added to the attached bid form (Revised 2014/05/01) to address the turn arrow described above. 10. There are two line items identified as line item #27. Response: Noted and revised. Please refer to attached Bid Form revised 05/01/2014. 11. Line Item #31 does not identify the rebar having to be galvanized and there’s no mention of grouting. This line item also calls for a limestone veneer. On sheet LM-02 of the plans it calls for 6”x8” Stone Veneer – Florida Oolite. Can you please provide a picture or an example of the proposed 6”x8” Limestone veneer? Response: Please refer to Addendums 2 and 3 previously posted to Demand Star with regards to rebar and grout. Bidders are directed to the City’s Intracoastal Park located at 16000, 16050, 16100 and 16200 Collins Ave for examples of the proposed columns and cupola. A further clarification – the limestone veneer is not 6” X 8”, but rather, 6” to 8”. 12. Line Items 32 through 34 a. Does not mention stucco. Shall the price of the stucco be included in these line items? c. The line item also mentions a cast in place cap. Can you please confirm if this is the 8”x8” reinforced concrete cap or the 4” decorative concrete cap. Response: a. The perimeter wall construction includes all the cost to deliver a finished, code compliant product from the foundation to the 4” concrete wall cap. The stucco shall be considered a part of these costs b. The cast in place cap referred to is the 4” concrete wall cap, as depicted on sheets ST- 02 LM-03, Detail 8. The cap shall also be considered a part of the wall construction costs. 4 Request for Clarification No. 2 ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT CITY RFP NO. 14-04-01 13. Sheet CC-01 shows the existing pedestrian gate being removed by the proposer but there was no line item provided for the removal. Response: Bidders shall refer to FDOT pay item notes/details for all bid items which for which an FDOT Pay Item # is provided. The removal of the existing pedestrian gate shall be considered a part of the clearing and grubbing activities – Bid item #1. 14. Sheet ST-02 Detail 3 – ST-02 calls for a calls for a 4”x4” concrete reinforced cupolas. Are these meant to be pre-casted or is it the City’s intention to have them formed on site with the oolite and grout? Response: Construction methodology is at the discretion of the contractor. The final deliverable should be in keeping with the Contract documents and all applicable local, state and federal agency requirements. 15. Has the City applied for an FDOT permit? Response: The City has obtained a Landscape Permit from the Florida Department of Transportation for the proposed work within the right-of-way, as depicted on the Contract Documents. A copy of the permit (permit # 2014-L-691-6) has been provided herein for reference. The successful proposer shall be responsible for obtaining all construction permits necessary for execution of the design intent. 16. Can existing East side drive way be closed during construction? Response: The existing driveway to Collins Ave serves as a vehicular egress/ingress for residents as well as garbage pick-up for the community. As such, access must be maintained at all times for the duration of the project. 17. Will City’s Landscape Architect provide acceptance letter of final approval for landscaping? Response: Final approval of the installed landscaping will be subject to inspections by the City’s Landscape Architect, FDOT, Miami-Dade County RER and the City of Sunny Isles Beach. 5 Request for Clarification No. 2 ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT CITY RFP NO. 14-04-01 18. On sheet LM-03 detail 8 & 9, can these be precast and set in mud on top of wall as stated in detail 4 same page? Response: Exact construction methodology is at the discretion of the Contractor, however, the structural requirements outlined on sheet ST-02 Section 3 must be satisfied. 19. Please clarify in which line item the cost associated with connecting into the existing irrigation main line/backflow should be allocated or please provide a separate line item. Response: Exact construction methodology is at the discretion of the Contractor, however, the structural requirements outlined on sheet ST-02 Section 3 must be satisfied, as well as any other requirements outlined by the City Building Department. 20. How will we handle the replacement of any Collins Avenue Asphalt, curb or gutter required by FDOT? Response: The current contract documents and FDOT permit assume that the existing curb and gutter will remain in place. If damaged by the contractor during the construction operation, existing curb and gutter shall be replaced by the Contractor at no additional cost to the project. 21. Line item #29 is requesting a Lump Sum to replace and restore existing electrical within Arlen House impacted by proposed project. Can you please provide plans illustrating existing electrical? Response: Line item # 29 has been eliminated in lieu of a lump sum (LS) contingency to account for this line item. See contingency item # 87 – Electrical Systems Contingency. Prior to start of work on any contingency related items, the Contractor must submit an itemized breakdown to the City for review and approval. 22. Line Item #80 is for the replacement and restoration of the existing irrigation within the Arlen House. Can you please provide plans illustrating existing irrigation? Response: Line item # 80 has been eliminated in lieu of a lump sum (LS) contingency to account for this line item. See contingency item # 86 – Irrigation Systems Contingency. Prior to start of work on any contingency related items, the Contractor must submit an itemized breakdown to the City for review and approval. 6 Request for Clarification No. 2 ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT CITY RFP NO. 14-04-01 23. Will we need to provide the final survey of the easement for FDOT requirements? Response: Yes. A final survey of the easement will be required. 24. Can you provide a list of materials to be included with the gates being provided, i.e. openers, tracks, detection devices, and loop/card key sensor? Response: The following items will be furnished and installed by the gate manufacturer: i. Two (2) decorative aluminum sliding gates (9’ L x 8’ H) including mounting posts, guide roller, gate wheels and a V-groove gate track ii. One (1) decorative aluminum pedestrian gate (40” W x 8’H) including mounting posts, self-closing hinges and door handles iii. Gate operators including loops, battery backup units and radio receiver iv. Wire terminations at each gate operator v. Concrete pad for gate operator vi. Concrete foundation for each gate track vii. Wire terminations at breaker panels Under this RFP, the successful contractor will be responsible for the following with regards to the gate systems: i. Installation and/or rerouting of conduits and wiring for the necessary high voltage power to each gate operator. 25. The Proposal/Bid Docs require all underground utility work within the right-of-way to be installed using directional bore. Please clarify in which line item this cost should be allocated per utility or please provide a separate line item per utility. Response: Directional bore within the right-of-way should be allocated as follows: i. Electrical: Bid item # 27 - Furnish and install all equipment, materials and labor necessary to connect proposed and existing electrical components to existing Load Center on the north side of Bayview Drive. ii. Irrigation: Bid item # 79A - Furnish and install all equipment, materials and labor necessary to connect proposed and existing irrigation components to existing irrigation backflow preventer on the north side of Bayview Drive. 7 Request for Clarification No. 2 ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT CITY RFP NO. 14-04-01 26. Is there any waterproofing required on the concrete stem wall ST-02 where the grades are different elevation? This will prevent moisture transmission through the wall and creating mildew. Response: At all vertical poured and CMU/retaining walls that are below grade, provide minimum 150 mils thick bentonite (or approved equal) dual sheet waterproofing membrane. 27. Sheet LM-01 the Hardscape Finish Schedule refers to the pavers being 8” x 8” x 80 mm are not available. The previous walkways were done with 60mm pavers. Please advise if we can use 60mm pavers on top of the concrete sub slab. Response: Yes. 60mm pavers may be utilized. 28. On sheet EE-01 please clarify the power source for the gate openers? How far is the panel & what type? Response: The gate power source is located inside the Arlen House condo building, approximately 400 ft from the gates. The panel type is unknown. The successful bidder will need to coordinate further with the Arlen House. END OF SECTION 8 Bermello Ajamil Partners, Inc. - 2601 South Bayshore Drive• 10th Floor• Miami• Florida• 33133• Main 305 859 2050• Fax 305 860 3768 1 OF 7 BID ITEM # REF. FDOT PAY ITEM #UNIT EST. QUANTITY UNIT COST EXTENDED COST 1 110-1-1 LS 1 $ $ 2 110-4 SY 402 $ $ 3 110-20 LS 1 $ $ 4 N/A LS 1 $ $ 5 N/A LF 500 $ $ 6 N/A LS 1 $ $ 7 N/A LS 1 $ $ 8 N/A EA 2 $ $ 9 N/A EA 1 $ $ 10 N/A EA 1 $ $ $ 11 101-1 LS 1 $ $ 12 102-1 LS 1 $ $ 13 102-3 CY 250 $ $ 14 104-10 LF __________$ $ 15 104-18 EA 2 $ $ Removal, storage and reinstallation of existing trash receptacle. Includes reconstruction of concrete base (to match existing or proposed paving detail, whichever is greater). Removal, storage and reinstallation of existing bush shelter. Reinstallation to be in accordance with Miami-Dade County Transit criteria. Costs also include temporary bus stop relocation (location to be coordinated by Contractor with the City and Miami-Dade County Transit) Subtotal for Demolition Temporary Construction Fencing (includes temporary security fence along Arlen House property) Removal, storage and reinstallation of existing benches. Includes reconstruction of concrete base/footing (to match existing or proposed paving detail, whichever is greater). Remove and relocate existing flag pole within Arlen House property, at the direction of the Condominium Association Furnish and Install temporary 6-ft tall security fence along Arlen House property Removal and temporary relocation of existing Arlen House vehicular gates including associated electric and automation I. DEMOLITION Commerical Material for Driveway Maintenance Mobilization Maintenance of Traffic (MOT) Arlen House Right-of-Way Streetscape Improvements DESCRIPTION City of Sunny Isles Beach, Florida Clearing and Grubbing Removal of existing wall and associated aluminium fence. (Existing reinforcement unknown. Contractor to investigate prior to bid) Removal of existing concrete pavement (Existing reinforcement unknown. Contractor to investigate prior to bid) II. SITE CIVIL Inlet Protection System Sediment Barrier (Revised 2014-05-01) Bermello Ajamil Partners, Inc. - 2601 South Bayshore Drive• 10th Floor• Miami• Florida• 33133• Main 305 859 2050• Fax 305 860 3768 2 OF 7 BID ITEM # REF. FDOT PAY ITEM #UNIT EST. QUANTITY UNIT COST EXTENDED COST Arlen House Right-of-Way Streetscape Improvements DESCRIPTION City of Sunny Isles Beach, Florida (Revised 2014-05-01) 16 1080-15 EA 10 $ $ 17 1644-7 EA 2 $ $ 18 N/A LS 1 $ $ 19 N/A SY 17 $ $ 20 700-1-5 AS 3 $ $ 21 711-16-221 LF 15 $ $ 21A 711-11-170 EA 1 $ $ 22 711-11-122 LF 12 $ $ 23 711-16-1212 LF 75 $ $ $ 24 N/A EA 42 $ $ 25 N/A EA 22 $ $ 26 N/A EA 2 $ $ 27 N/A LS 1 $ $ 28 N/A LS 1 $ $ 29 N/A LS 1 $ $ 30 N/A LS 1 $ $ $ 31 N/A EA 22 $ $ Fire Hydrants - adjust to match proposed sidewalk elevations Subtotal for Landscape Electrical Replace and restore existing electrical within Arlen House impacted by proposed project ELECTRICAL STRUCTURAL Turn Arrow (Thermoplastic) Solid Traffic Stripe (Thermoplastic) (6") Double Yellow Subtotal for Site Civil Utility Fixtures - adjust to match proposed sidewalk elevations Furnish and Install all equipment, materials and labor necessary for a fully functional, code compliant gate system (vehicular and pedestrian) Viking L-3 control/motor for slide gate operations - Furnish and Install Furnish and install all equipment, materials and labor necessary to connect proposed and existing electrical components to existing Load Center on the north side of Bayview Drive. Furnish and install all equipment and materials necessary for a fully functional automated irrigation controller and system within the limits of the proposed improvements. Landscape Up Lights - Furnish and Install Column Lights - Furnish and Install Solid Traffic Stripe (Thermoplastic) (6") White Turnout Construction - Asphalt (Inlcudes excavatio, construction of new base course) Relocate Existing Traffic Sign & Post (Single Post) Column - Furnish and install complete code compliant column including but not limited to the costs from foundation to cuploa, primed and painted caps (combination precast and cast in place) and sealed limestone veneer, concrete, steel, and column tops. Existing utility investigation of project limits (private and public) 24" Stop Bar (Thermoplastic) - White Bermello Ajamil Partners, Inc. - 2601 South Bayshore Drive• 10th Floor• Miami• Florida• 33133• Main 305 859 2050• Fax 305 860 3768 3 OF 7 BID ITEM # REF. FDOT PAY ITEM #UNIT EST. QUANTITY UNIT COST EXTENDED COST Arlen House Right-of-Way Streetscape Improvements DESCRIPTION City of Sunny Isles Beach, Florida (Revised 2014-05-01) 32 534-73 SF 2835 $ $ 33 534-73 SF 960 $ $ 34 534-73 SF 110 $ $ 35 N/A EA 2 $ $ 36 522-4 LS 1 $ $ $ 37 526-1-2 SY 12 $ $ 38 526-1-2 SY 174 $ $ 39 526-1-2 SY 14 $ $ 40 526-1-2 SY 168 $ $ 41 526-1-2 SY 6 $ $ 42 526-1-2 SY 76 $ $ 43 522-2 SY 60 $ $ 44 527-2 SF 15 $ $ 45 522-1 SY 10 $ $ 46 527-2 SF 10 $ $ Detectable Warnings; 4" X 8" truncated dome, 80mm, 3000 PSI concrete pavers Concrete Driveway, 6" thick (Removal and disposal of existing asphalt pavement shall be included in the cost of the new driveway.) HARDSCAPE Subtotal for Structural Gate structural support and wall connection - furnish and install Pavers, Architectural, Sidewalk - 8" X 8" Concrete Pavers, 80mm"; 3000 psi.; Camel Shell Stone; 90 Stack Bono Rectangles. (Cost includes concrete base for pavers) Perimeter Wall Detail 1- inclusive of all costs to furnish and install wall from foundation to cast- in place cap; painted and primed Perimeter Wall Detail 2 -inclusive of all costs to furnish and install wall from foundation to cast- in place cap; painted and primed Perimeter Wall Detail 4-inclusive of all costs to furnish and install wall from foundation to cast- in place cap; painted and primed Pavers, Architectural, Sidewalk - 4" X 8" Concrete Pavers, 80mm"; 3000 psi.; 8" Soldier Course; Camel Shell Stone. (Cost includes sand base for pavers.) Pavers, Architectural, Sidewalk - 8" X 8" Concrete Pavers, 80mm; 3000 psi.; Camel Shell Stone; 90 Stack Bono Rectangles. (Cost includes sand base for pavers) Pavers, Architectural, Sidewalk - 4" X 8" Concrete Pavers, 80mm"; 3000 psi.; 8" Soldier Course; Camel Shell Stone. (Cost includes concrete base for pavers.) Pavers, Architectural, Sidewalk - 8" X 8" Concrete Pavers, 80mm; 3000 psi.; Light Shell Stone; 90 Stack Bono Rectangles. (Cost includes concrete base for pavers) Pavers, Architectural, Sidewalk - 8" X 8" Concrete Pavers, 80mm; 3000 psi.; Light Shell Stone; 90 Stack Bono Rectangles. (Cost includes sand base for pavers) Concrete Sidewalk - 4" thick Detectable Warnings Bus Shelter Pad and Footing - Furnish and Install per Miami-Dade County Transit, Florida Building Code and City of Sunny Isles Beach regulations Bermello Ajamil Partners, Inc. - 2601 South Bayshore Drive• 10th Floor• Miami• Florida• 33133• Main 305 859 2050• Fax 305 860 3768 4 OF 7 BID ITEM # REF. FDOT PAY ITEM #UNIT EST. QUANTITY UNIT COST EXTENDED COST Arlen House Right-of-Way Streetscape Improvements DESCRIPTION City of Sunny Isles Beach, Florida (Revised 2014-05-01) $ Landscape Complete (Large) 47 580-1-2 EA 21 $ $ 48 580-1-2 EA 11 $ $ 49 580-1-1 EA 247 $ $ $ 50 580-1-1 EA 349 $ $ 51 580-1-1 EA 1310 $ $ 52 580-1-1 EA 193 $ $ 53 580-1-1 EA 238 $ $ 54 580-1-1 EA 125 $ $ $ 55 570-1-2 SY 666 $ $ 56 N/A CY 62 $ $ 57 N/A EA 32 $ $ 58 N/A CY 535 $ $ $ $ 59 590-1 EA 63 $ $ Chrysobalanus icaco 'Red Tip'- Red Tip Cocoplum; 3 gal.; 18" X 12" Chrysobalanus icaco 'Red Tip'- Red Tip Cocoplum ; 7 gal.; 30" X 24" Medjool Date Palm - Phoenix dactylifera 'Medjool'; Match Existing Landcape Complete (Miscellaneous) Subtotal for Landscape Complete (Miscellaneous) Blueberry Flax Lilly - Dianella tasmanica 'variegated'; 3 gal.; 18" X 24" Bahia Grass - Paspalum notatu on 2" topsoil bed. I nclusive of but not limited to the replacement of sod within the Arlen House property along the length of the proposed wall from the back of wall to edge of pavement. Mulch (Furnish and Install) IRRIGATION LANDSCAPE Pitch Apple - Clusia rosea Regrade/Reshape new swale/landscape area between back of sidewalk and proposed wall (Furnish and Install) Neoreglia Bromeliad 'Fireball' - Bromeliad neoreglia sp.; 1 gal.; 6" X 6" Ficus microcarpa 'Green island' - Green Island Ficus; 3 gal; 18" x 18" Guying and Staking (Furnish and Install) Orange Aechimea Bromeliad - Aechmea blanchetiana ; 3 gal; 24" X 24" Landcape Complete (Small) Subtotal for Landscape Complete (Small) Subtotal of Landscape Subtotal for Landscape Complete (Large) Subtotal of Hardscape Rain Bird Flood Bubbler; Model No.1404 Bermello Ajamil Partners, Inc. - 2601 South Bayshore Drive• 10th Floor• Miami• Florida• 33133• Main 305 859 2050• Fax 305 860 3768 5 OF 7 BID ITEM # REF. FDOT PAY ITEM #UNIT EST. QUANTITY UNIT COST EXTENDED COST Arlen House Right-of-Way Streetscape Improvements DESCRIPTION City of Sunny Isles Beach, Florida (Revised 2014-05-01) 60 590-1 EA 2 $ $ 61 590-1 EA 4 $ $ 62 590-1 EA 1 $ $ 63 590-1 EA 6 $ $ 64 590-1 EA 29 $ $ 65 590-1 EA 7 $ $ 66 590-1 EA 34 $ $ 67 590-1 EA 3 $ $ 68 590-1 EA 4 $ $ 69 590-1 EA 30 $ $ 70 590-1 EA 7 $ $ 71 590-3 EA 1 $ $ 72 590-1 EA 2 $ $ 73 590-1 EA 1 $ $ 74 1080-11101 EA 8 $ $ 75 1080-11103 EA 1 $ $ 76 N/A LF _________$ $ 77 N/A LF _________$ $ 78 N/A LF _________$ $ 79 N/A EA 1 $ $ 79A N/A LS 1 $ $ 80 N/A LS 1 $ $ $ 81 N/A LS 1 $ $ Gate Valve Assembly Replace and restore existing irrigation within Arlen House impacted by proposed project Rain Bird 6" Pop-Up Spray; Model No. 1806- 15LCS Furnish and install all equipment, materials and labor necessary to connect proposed and existing irrigation components to existing backflow preventor on the north side of Bayview Drive. Rain Bird 6" Pop-Up Spray; Model No. 1806- 15SST Rain Bird 1" Solenoid Valve; Model No. 100 PEB Rain Bird Automatic Controller; Model No. ESP- 4M Rain Bird Expansion Module; Model No. ESP- SM3 Valve Box PROJECT CLOSE OUT Rain Bird Rain Sensor; Model No. RSD-BEX Subtotal of Irrigation Rain Bird Flood Bubbler; Model No. 8A-PS-5Q-B Rain Bird 6" Pop-Up Spray; Model No. 1806-10Q Rain Bird 6" Pop-Up Spray; Model No. 1806-10H Grounding Location (Furnish and Install) Rain Bird Stream Bubbler; Model No. 8A-PS- 5CST-B Rain Bird 6" Pop-Up Spray; Model No. 1806- 15RCS Paige Thhn Wire; Model No. #14 AWG (Furnish and Install) SCH 40 Galvanized Steel (Furnish and Install) SCH 40 PVC (Furnish and Install) As-built record drawings (electronic and hard copy) Rain Bird Stream Bubbler; Model No. 8A-PS-10Q Rain Bird Stream Bubbler; Model No. 8A-PS-10H Rain Bird Stream Bubbler; Model No. 8A-PS-10F Bermello Ajamil Partners, Inc. - 2601 South Bayshore Drive• 10th Floor• Miami• Florida• 33133• Main 305 859 2050• Fax 305 860 3768 6 OF 7 BID ITEM # REF. FDOT PAY ITEM #UNIT EST. QUANTITY UNIT COST EXTENDED COST Arlen House Right-of-Way Streetscape Improvements DESCRIPTION City of Sunny Isles Beach, Florida (Revised 2014-05-01) 82 N/A LS 1 $ $ 83 N/A LF ________$ $ 84 N/A SY 670 $ $ $ $ 85 N/A LS 1 10%#VALUE! 86 N/A LS 1 $7,500.00 $7,500.00 87 N/A LS 1 $20,000.00 $20,000.00 $ 88 N/A EA 25 $ $ 89 N/A EA 33 $ $ 90 N/A EA 5 $ $ $ 91 1644-113 EA 2 $ $ 92 1080-11-B1 EA 10 $ $ 93 N/A EA 1 $ $ Relocation of existing 15' X 15' trees, including wood staking, at the direction of the City. Relocation of existing palms, including wood staking, at the direction of the City. Removal of existing 25' X 25' trees at the direction of the city Landscape Relocation BID TOTAL: Irrigation Systems Contingency - Replace and restore existing irrigation within Arlen House impacted by proposed project Electrical Systems Contingency - Replace and restore existing electrical systems within the Arlen House property impacted by the proposed improvements. CONTINGENCIES Replace existing curb along BayView Drive within limits of staging area. (Any curb damaged by contractor outside these limits shall be repaired at Contractor's sole expense and shall not be included in bid.) Replace existing fire hyrant, furnish and install. Size to match existing Subtotal for Landscape Relcoation Project Contingency Subtotal of Project Close Out BID SUBTOTAL: Sod Restoration within Arlen House from back of wall to edge of pavement, along full length of wall Replace existing valve and electrical box, furnish and install to match existing ADD ALTERNATES Mill and Resurface fulll right-of-way of Bayview Drive from Collins Ave to existing guard house. Cost includes installation of thermoplastic striping within mill/resurface limits Litter Receptacle, 30 gal.; Black Polyester Powder Coating. Furnish and Install to match existing. Bermello Ajamil Partners, Inc. - 2601 South Bayshore Drive• 10th Floor• Miami• Florida• 33133• Main 305 859 2050• Fax 305 860 3768 7 OF 7 BID ITEM # REF. FDOT PAY ITEM #UNIT EST. QUANTITY UNIT COST EXTENDED COST Arlen House Right-of-Way Streetscape Improvements DESCRIPTION City of Sunny Isles Beach, Florida (Revised 2014-05-01) 94 N/A EA 1 $ $ 95 N/A EA 1 $ $ 96 N/A __________________$ $ 97 N/A __________________ $ $ 98 N/A __________________ $ $ 99 N/A __________________ $ $ $ NOTE: Subtotal of Additional ____________________________________________ ____________________________________________ ____________________________________________ ____________________________________________ ____________________________________________ ____________________________________________ ____________________________________________ ____________________________________________ ____________________________________________ ____________________________________________ ____________________________________________ ____________________________________________ Additional Scope or Potential Cost Savings (Specified by Contractor not listed above) ____________________________________________ ____________________________________________ ____________________________________________ ____________________________________________ Replace existing irrigation backflow preventer (if required) The Quantities shown in this Bid Form are estimates only. They are generally representative of the work that will be required by the Contractor. The Contractor shall be responsible for veryfying all quantities prior to bid. The Contractor shall ensure that ALL work for the proposed right-of-way improvements is completed for the TOTAL price submitted on this Bid Form. The Bidder, by signing this Bid Form and Contract fully acknowledges that he/she will recieve no additional compensation (no overhead, no anticipated profits etc), other than the bid unit price of these items times the number of items authorized, ordered, installed and accepted by the City; unless it can be proven and agreed to in writing by the City that additional work is required (prior to commencement of additional work). Bench w/ 7 7/4" x 7/16" Plaque; Black Polyester Powder Coating Furnish and install to match existing.