HomeMy WebLinkAboutAdd No 3
Addendum No. 3
CITY OF SUNNY ISLES BEACH
Government Center Repairs
CITY RFP No. 14-07-01
To All Bidders:
Bidders for the above referenced project shall take note of the following changes, additions, deletions,
clarifications, et cetera to the Plans and Specifications, which in accordance with the Contract Documents
shall become a part of and have precedence over anything shown or described otherwise.
Please remove and replace Attachment ‘A’ – Performance Specification in the Bid
Specifications. The revised attachment is attached.
END OF SECTION.
Performance Specifications
Attachment A
1 Base bid Building envelope and water proofing and painting
Building has numerous cracks and points of water intrusion
throughout the envelope. The contractor is required to examine
the building and provide services to install and repair new paint
and caulking on all previous painted surfaces and caulked joints
on the building exterior and in the parking garage including the
interior and exterior of stairway #4 and #5,
Includes painting entire parking garage and exterior of
administrative building (previously painted surfaces only including
stairs and rails)
Caulking around edges of previously caulked parking garage)
Parking garage 3rd floor expansion joint remove and replace in area
near owner installed gutter
Apply Tremco or equivalent on levels 2 and 3 and on the ramps
(previously sealed areas)
Clean, repair or recaulk (as may be required) joints in granite
panels and precast panel joints
Clean, repair or recaulk windows joints metal to glass and metal
to masonry
A. All Areas Showing Signs of Mildew Will Be Treated With an
Approved Mildewcide and Water Solution.
B. All Exterior Stucco Surfaces Will Be Pressure Cleaned Using A
Minimum Of 3,000 P.S.I.
C. All Other Surfaces Will Be pressure Cleaned Using The
appropriate Pressure For The Surface.
D. All Exterior Stucco Surfaces Will Be Sealed Using Sealer
Conditioner / Masonry Primer/Sealer.
E. All Areas Showing Signs Of Rust Will Be Wire Brushed And
Primed As Needed Using: Rust Inhibitive Primer And Then Finish
Coating.
F. All Stucco Stress Cracks Larger Than 1/16 Inch Will Be ” V”
Open Apply A Bead Of Caulk In Gap, Apply Textured Knife Grade
Elastomeric
Patching Compound Over The Top And Over Lapping The Edges By
Two Inches On Each Side.
G. All Window Perimeters (Stucco To Metal), Will Have Loose And
Deteriorated Caulk Removed. Re-Caulk
H. All Exterior Vertical Stucco Surfaces To Be Waterproof Will Be
Finish Coated Using One (1) Coats 100% Acrylic Super Paint by
Sherwin Williams or equivalent as specified in attached.
I. All Precast walls apply Xyloxon Water repellant Clear Sealer.
J. All Wood Surfaces Shall Be Spot Primed, As Needed, Than
Finished With 100% Acrylic Gloss
included
2 Base bid Concrete Repairs Vertical Surfaces
Beams, parapets, walls, columns
Cast in place concrete on building exterior and garage interiors shall be
inspected for cracking and spalling and repaired nte 6 inches deep includes
rebar, repair , priming, patch of concrete,
Sika materials or equivalent for crack filling, concrete restoration. Bonding,
priming of rebar
NTE 75 lf of concrete repair
included
3 Base bid Concrete repairs horizontal Surfaces
Slabs, concrete driving surfaces
Shall be repaired including applying low viscosity epoxy filler to crack in
parking garage 2nd floor coming up to third floor
NTE 200 LF of crack to be filled
Sika or equivalent
included
4 Base bid Stucco and finish repairs
Contractor is required to provide “sounding of Stucco” in areas of known
delamination and mark areas for repair or removal and replacement.
Owner’s staff or designee shall provide field review of areas to determine
total area and scope of repairs using unit prices and allowances provided as
part of bid attached here-to
NTE 350 SF of delaminating stucco removal and repair
included
5 Base bid Precast vertical panel stains
Contractor is to repair stains or “burn-outs” on pre-cast panels caused by
isolated surface contaminants located on vertical surfaces throughout Office
building. Contaminants are thought to be on surface or within 1/4inch deep
or less. The owner may request petrological analysis to determine the
underlying cause of stains.
Contractor shall remove stains by chemical treatment, grinding or other
appropriate method, patch as maybe required. If underlying metal structure
is exposed it shall be cleaned of all rust and treated with appropriate primer
and the concrete repaired
NTE 25 locations of stain repair
included
6 Base bid Stainless steel stair rail replacement
Remove and replace existing stainless steel stair rails on east end of
building in vicinity of fountain, with an architecturally similar stainless rail ,
repair damaged precast concrete stair, pressure clean and seal concrete with
clear sealer. Reuse existing embedment for attachment if possible or core
precast stair and install posts with compatible grout. Rails and posts to be
Type 316 brushed #4 satin finish. Hardware and fasteners are to be of
compatible material suitable for marine exposure. Include repair of concrete
in area of railing replacement NTE 3- 6 inch square areas. Signed and sealed
shop drawings shall be provided and permit obtained if required.
included
7 Base bid Garage and driving surface
Ramp and level 2 and 3 and 4 Remove existing sealant at joints in slab to
slab, slab to expansion joint, slab to wall and other joints necessary to
provide a seal to prevent water from penetrating joints. Use Tremco
Dymeric 240 two part urethane sealer or equivalent
Remove parking lines using pressure cleaning. Prep existing coated areas
using solvent wipe and prime with Tremco vulkem tremco 191 or compatible
primer install Vulkem 350NF/346/346 according to manufacturer’s
specifications, Medium and Heavy Duty Traffic Coating System.
At high traffic areas including driveways, turns and ramps apply second
coat of vulkem 346 with sand.
Expansion joints
Remove and replace expansion joint at third floor parking deck
Install new trough floor drain in front of stairway entrance on second floor of
parking garage one location NTE 3 feet long. Connect to existing drain
system include cast iron pipe and all hangers, fasteners, connections and
drains. NTE 25 feet of connecting pipe.
Remove and replace existing trough drains in front of the stair way doors 2
locations, stair #4 and # 5 on 4th floor of parking garage, include drain,
caulking and NTE 3 feet of BIP to match existing.
included
8 Base bid Sprinkler head and escutcheon replacement
Remove and replace existing fire sprinkler heads and escutcheons on open
atrium areas around the commission chambers and in front of library and
other spaces on the south side outside of office areas (first floor only) and
over pre-cast stairs on east end of building. New sprinklers and escutcheons
to be corrosion resistant, designed for outdoor use. Contractor to re-use
existing risers, fittings and pipe.
Repair of hidden pipe and fittings, and exposed pipe that is not identified
here-in not included
Include NTE 15 sprinkler heads and escutcheons
included
9 Base bid Door hardware, Repaint doors
Repair rusted exterior metal doors and hardware on rear of commission
chambers and other locations throughout garage and government center
Remove rust from hardware or replace with SST hinges as may be required.
Paint All previously painted exterior hollow metal doors including all stair
doors in garage painted 2 sides, prime with rust neutralizing primer and
paint to match original door.
included
10 Base bid Camera housing
Remove and replace corroded camera housing with corrosion resistant
housing suitable for exterior application in coastal exposure. Reuse existing
included
wiring, connectors and camera. Programming and new cameras, wiring or
connectors, if any to be provided by the CSIB.
NTE 2 locations in area outside the library and commission chambers
11 Base bid Commission Chambers
Repair/reinstall acoustic panels and finishes inside commission chambers
below 8 feet in height and above the floor including various sound insulating
panels and decorative wood finishes, molding etc. Labor only, reuse existing
material. Includes minor spot touch up and patching, painting and
refinishing, reattachment of various wall panel areas NTE 100 sf
included
12 Base Bid Remove and replace 3 wall pac light fixtures and 3 exit light fixtures with
new or equivalent to match existing NTE 6 total locations combined
included
13 Base bid Remove and Replace existing emergency/Standby Generator
Contractor shall provide 1 new generator to top deck of parking garage
north side of 4th floor and disconnect and move existing generator and
external radiator to City garage first floor for storage on blocks, covered
with a secured tarp:
New 500 KW or equivalent diesel generator to replace existing Emergency
/standby Generator currently housed in first floor generator room, NTE
existing load. New generator shall be in a sound attenuated, aluminum UL
listed marine enclosure capable of withstanding rooftop exposure, with
integral radiator and muffler. Generator shall be wired into existing
Emergency circuits and must meet the existing electrical loads and
characteristics of the system it replaces.
Perkins or equivalent.
The generator shall be fueled from existing site tank by means of a new
pump and piping extending the existing point of connection in or near the
generator room. Wiring switch gear and conduit, labor, piping required to
install and connect new generator to the first floor equipment locations shall
be included.
It is expected that no new conduit or wiring is required from the existing
generator in the old generator room to the loads.
Exterior Switch gear, junction boxes and devices, conduit, piping required
for proper connection must meet roof top exposure requirements, including
NEMA III as may be necessary.
System must be added to lightning protect loop
Generator shall be equipped with a double walled steel base tank capable of
8 hours minimum continuous operation on diesel fuel. Entire system must
be connected to existing main storage tank through existing plumbing in the
current emergency generator room. All controls, switches, valves, pumps
must be installed to provide the same operation and intent of the existing
day tank and system configuration as shown in attached diagram.
Work will include tie downs, and generator and associated equipment and
shall be installed on a level Aluminum frame or suitable slab capable of
included
distributing the weight across the foot print of the generator and adjacent
area required for weight distribution, meeting all wind load and building
code requirements. The generator will be protected on driving side of the
parking garage by a 4 inch schedule 40 steel bollard painted yellow -
minimum 2 locations
City may elect to exercise a direct purchase option to save on sales tax
expenses.
14 New 1000 500 KW diesel stand-by generator
In an aluminum or marine enclosure capable of withstanding rooftop
exposure, with integral radiator and muffler. Generator must have the
capacity to power parts of the Administrative building 4th floor and
miscellaneous loads. The included loads are TBD during shop drawing
development process but shall include air conditioning of fourth floor, lights
and facilities NTE 900 450 KW. Generator system is to be equipped with,
ATS installed in or near the old generator room, and accessory controls and
distribution sub panels and wiring to provide standby capacity for the fourth
floor of the Government Center including providing air conditioning and task
lighting. Generator shall be compatible with existing voltage, and wiring in
the building. The generator shall be fueled from existing tank by means of a
new pump and piping extending the existing point of connection in the
generator room. Generator to be fueled from point of connection in old
generator room, work shall include, pumps, piping and control valves.
Perkins or equivalent.
New Wiring, switch gear and conduit, labor, piping required to install and
connect generator from its location on the garage roof to the first floor
electrical room shall be included.
Switch gear, junction boxes and devices required for proper connection must
meet exposure requirements, including NEMA III as may be necessary
Work shall include but is NTE the addition of up to 1- 400 amp panel and
circuit breaker in main electrical room and 2-100 amp Sub panels (or
equivalent) on the administrative building fourth floor or enclosures and
associated wire, wiring labor and rewiring, junction boxes and controls to
create a standby capacity to serve the fourth floor. It is expected that all
standby loads will be picked up in the first floor electric room or nearby
space on the first floor located in the garage. If load control devices are
required to prevent overloading the generator capacity they can be installed
at the most cost effective location.
Work will include the connection of the roof top Chiller utilizing existing load
management controls sufficient to provide a working system to serve the
administration building 4rd floor. It is expected that any additional wiring or
home runs from the fourth floor in the administrative building to the main
generator room, the main electrical room on the 1st floor or the old
generator room will use the excess capacity in existing conduit. New
included
conduit from the load on the loads on the 4th floor to the existing generator
room or main electrical room is not included.
Chiller and AHU , controls modification repairs or replacement or New
chiller demand load management equipment is NIC
Redistribution of loads to new generator may be done in the most cost
effective location.
System shall be added to lightning protection loop.
Generator shall be equipped with a double walled steel base day tank
capable of 8 hours minimum continuous operation on diesel fuel. Entire
system must be connected to existing main storage tank through existing
plumbing in the generator room. All controls, switches, valves, pumps must
be installed to provide the same operation and intent of the existing day
tank and system configuration as shown in attached diagram.
Work will include tie downs, and generator and associated equipment and
shall be installed on a level Aluminum frame or suitable slab capable of
distributing the weight across the foot print of the generator and adjacent
area required for weight distribution, meeting all wind load and building
code requirements. The generator will be protected on driving side of the
parking garage by a 4 inch schedule 40 steel bollard painted yellow -
minimum 2 locations
City may elect to exercise a direct purchase option to save on sales tax
expenses.
15 Base bid Fountain waterproofing, tile/wall repair
Remove tile from base of wall in fountain up to the level of the top of the
fountain pool and NTE 1 foot- 12 inches above the waterline.
Install new tile to match existing or other finish acceptable to city NTE 100
square feet, apply Aquafin -2K/M Flexible Cementitious Protective &
Waterproof Coating to fountain bottom and sides up to top of removed tile.
See attached “fountain waterproofing area”
Remove three royal palms, deliver to City for install by City in location
specified by CSIB and demolish 3 concrete planters in Fountain.
Repair or install concrete below planter and rebuild continuous fountain wall
if required. Install new waterproofing system including … Aquafin -2K/M
Flexible Cementitious Protective & Waterproof Coating
Electrical and plumbing work is NIC All work to match existing as much as
reasonable
included
16 Base bid Performance and payment Bond and insurance
included
Contractor shall provide proof of bonding capacity for full value of base bid
plus all alternates or minimum $1 million whichever is larger.
Bond shall be provided for award amount.
17 Base bid Mobilization $
18 Unit price Stucco repairs in excess of amount in base bid psf $/PSF
19 Unit cost Tile repair in fountain additional tile psf including removal repair and
installation of new tile, water proofing
$/PSF
20 Unit cost Remove and replace reglets per LF, does not include stucco repairs $/PLF
21 Unit price Stains
Precast vertical panel stains
Unit cost for additional areas “burn-outs” or stains each
Each
22 Unit price Not used Each
23 Not used
24 Unit price Laboratory petrographic analysis
Contractor is to provide petrographic report from qualified engineer and/or
laboratory to determine cause of “burn-outs” and stains on existing pre-cast
architectural panels. NTE 3 samples will be taken and a report provided.
Each
25 Unit price Geotechnical testing and soil boring
Contractor shall obtain and provide soil boring and geotechnical/engineering
report in support and planning of construction, restoration of various City
buildings each location plus unit cost per boring hole including report
Each
26 Unit price Additional Labor based on Miami Dade County prevailing wages table (most
recent) certified payroll submission may be required. This may be used for
calculating the cost of additional work not in the base bid. Contractor
provide factor for mark-up greater than 1
factor
27 Unit price Remove and replace unreinforced concrete slabs and sidewalks maximum 6
inches thick, unreinforced
Cost psf
$/PSF
28 Unit price Remove and replace asphalt for electrical or plumbing trenches minimum 2
feet wide 1 inches thick, including compaction
Cost psf
$/PSF
29 Unit price for each additional sprinkler head and escutcheon each
30 Alternate
1
Additional items: As described in most recent version of Means Cost works
data base Facilities Cost Data 2014, 1st quarter or most current, times a
multiplier for Facilities Construction Cost, open shop adjusted for the local
area, including customary general conditions and markups. Work may be
performed on any City Property.
multiplier
31 Owner’s allowance Ventilation install in stair cases 4 and 5
and Misc HVAC and mechanical system repairs
All labor material, wiring, equipment to Install ventilation fans in stairs and
provide interface to fire alarm if required, provide signed and sealed shop
$20,000
drawings if required for permit. If approved work exceeds the allowance the
cost will be equitably adjusted.
32 Owner’s allowance for Structural augmentation and
miscellaneous building and system installation and repairs or
upgrades including but not limited to
Additional wiring for generators
Remote electrical controls and rewiring to implement
4th floor standby generator installation and operation.
Reinforcement of existing parking garage building to support generators and
related equipment including support of connection of plumbing, and
electrical equipment and Pre-design and engineering and miscellaneous
repairs to CSIBF grounds and facilities including engineered, signed and
sealed shop drawings The contractor will obtain building permits.
Allowance may be applied to miscellaneous laboratory testing including
petrographic Analysis and Soil Borings.
Contractor shall provide labor and material to install structural reinforcement
for the support of the generators and related equipment and installation
installed on the 4th floor of the garage. The structural load capacity of the
parking garage deck is approximately 50 PSF, the weight of each generator
is TBD, the contractor and engineer shall verify structural loads and
reinforce the structure if required.
If the approved work exceeds the allowance the cost will be equitably
adjusted.
$125,000
33 Allowance for PCP Heritage Parking de-lam of the garage
building
$100,000
34 notes Applies to all above items
1 Permit fees and costs allowance are by owner
2 Contractor is required to have an active License for Means Construction Cost
Data and P-6
3 Contractor is required to produce schedules in Primavera P-6 scheduling
software including monthly updates
4 Items not specifically included in base bid , unit prices or alternates may be
added as change orders as may be negotiated under the procurement rules
of the City but are not in contract
5 Work for preparation of signed and sealed engineering or architectural
drawings includes all site visits and meetings and pre-design work required
to develop plans and specs for full scope of work.
6 NIC means not in contract and NTE means not to exceed
7 Base project to be completed working 180 days from notice to proceed
8 Warranty runs from date of substantial completion of each installed work or
phase for 1 calendar year
Calculation of bid
1 Base bid including allowances (items 1 through 18)+ items
32,33) + (alternate 1*1,000) + mobilization
2 Total of unit prices (items 19 through 24 and 28,29 30)
multiplied x 1000
3 Add 1 plus 2 Permit Allowance (total of all fees detailed below) $______________
City of Sunny Isles Master Building Permit
a) City Permit Fees (2.5% of construction costs)
b) Dade County Fees ($0.06/$1,000.00 of project
value)
c) State Fees (3% of City permit fee)
d) Technology and Education ($7% of City permit
fee)
City of Sunny Isles Sub Permit Fees (for each sub
discipline permit required, including mechanical,
electrical and plumbing)
a) City Permit Fees (2.5% of discipline construction
costs)
b) State Fees (3% of City permit fees)
c) Technology and Education (7% of City permit
fees)
Miami-Dade County RER (Per Miami-Dade
Implementing Order IO No 4-42 Fee Schedule for
Regulatory and Economic Resources)
Miami-Dade County Fire (Per Miami-Dade
Implementing Order IO 4-123 Miami-Dade County
Fire Prevention Fee Schedule)
a) Upfront Processing Fee (30% of cost of cost of
new permit)
b) Alterations and Building Repairs
i) $9.90 for up to $1,000 of estimated cost or
fractional part (Min fee of $114.40)
ii) $2.20 for each additional $1,000 of estimated
cost or fractional part thereof
$______________
$_______________
$360.00
$_______________
Add 1 + 2+ 3 TOTAL BASE BID_________________________________________________