Loading...
HomeMy WebLinkAboutAdd No 1Tuesday, September 23, 2014 Addendum No. 1 CITY OF SUNNY ISLES BEACH Construction of the North Bay Road Pedestrian Emergency Bridge CITY RFP NO. 14-09-01 To All Bidders: Bidders for the above-referenced project shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise.  Please follow the link below to access the remaining documents for this RFP: https://www.dropbox.com/sh/j6hw5h23s9keoiq/AAAUduLsWLNoBZ5f8-X_d4bka?dl=0 The above link includes the following documents: 1. Attachment “A” – Supplemental Scope of Work 2. Bridge Plans 3. Bridge Structural Plans 4. Permanent Retaining Wall Plans 5. Reinforcement Wall Plans 6. Construction Requirements for Retaining Wall System (Wall – ARES) 7. SFWMD Permit 8. Army Corps of Engineers’ Permit 9. Preliminary Approval from DERM 10. Geotechnical Report END OF SECTION