HomeMy WebLinkAboutAdd No 10 Addendum 10 CITY OF SUNNY ISLES BEACH CONSTRUCTION OF THE NORTH BAY ROAD PEDESTRIAN EMERGENCY BRIDGE CITY RFP NO. 14-09-01 To All Bidders: Bidders for the above referenced project shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise.  Attachments: Table 1 – MAJOR ITEM SCHEDULE OF VALUES US Coast Guard Permit #9-14-7 dated 20 February 2015 Bridge Plan Sheets BW-2, BW-3, BW-4, and B-24 (Revised) Roadway Plan Sheets 1, 4, 5, 11, 12, 14, 16-23, 26 (Revised) Roadway Plan Sheet 18-A (New)  Questions/Clarifications: Q1: Will additional plan sheets be provided for MOT? If not, will MOT restrictions be provided to clarify work time restrictions, minimum lanes required, pedestrian requirements, etc. A1: MOT plans for approval shall be submitted by the Contractor to the City for review and approval. MOT shall be placed and maintained in accordance with FDOT Standards and provide for the safe movements for both vehicles and pedestrians at all times. Work time restrictions are listed in the City of Sunny Isles Beach Code of Ordinances Article III – Construction Noise §193-6. Q2: It appears that the drainage plans on the north side are incomplete – plan view page 12 does not show any drainage while the cross sections, sheet 19- show 19” x 30” pipe and 5’x5’ exfiltration trench. Will roadway plans be revised to show drainage? A2: The City of Sunny Isles Beach has a separate drainage construction project not associated with this Emergency Bridge project. The drainage project includes a new outfall and related infrastructure within the North Bay Road right of way between 174 Street and the canal. It is expected that this drainage project will Addendum No.10  CONSTRUCTION OF THE NORTH BAY ROAD PEDESTRIAN EMERGENCY BRIDGE  CITY RFP NO. 14‐09‐01        2      underway concurrent with the bridge construction. The drainage scope of work is currently included in the 174th St project (By Others) and as such, the cross sections are depicted as existing. Extensive coordination with the 174th St Contractor will be required as part of this project. In the event the drainage project is delayed or withdrawn, the City will solicit additional pricing from the contractor for this Emergency Bridge project to construct the outfall and related drainage improvements. Q3: Typical section sheet 4 shows an interior barrier wall adjacent to the 5’6” sidewalk. MSE plans and roadway plans do not show this wall. Will revised drawings be provided for the typical sections, MSE or roadway drawings? A3: The plans have been revised to eliminate the interior barrier wall. Q4: Typical section sheet 4 shows a pedestrian barrier wall, but does not show a sidewalk or standard moment slab. Which moment slab detail should be followed here? A4: The Roadway Drawings have been revised to show the standard moment slab/junction slab of the MSE Wall Details. Q5: Ground improvement are shown from 20+70 to 21+70 and 24+12 to 26+40. Will any demucking be required beyond this area? A5: The limits of demucking will be dependent upon the means and methods employed by the contractor noting that the plan data is based upon the conditions found at the individual boring locations. While best professional efforts and due care were put forth in quantifying this item, field conditions may or may not match these limits exactly. The contractor shall satisfy himself of the limits of muck that must be removed for the project be constructed in accordance with the plans and specifications. Refer to Note 2 on Sheet BW-1 of the Bridge Drawings. Further, the regular excavation and embankment volumes shown in the plan sheets have been calculated without regard to subsoil excavation because the contractor is responsible to choose from the method of soil improvements shown in the Geotechnical Report, which was issued with and is a part of the contract documents. The chosen method of soil improvement would impact the volume, so the excavation and embankment volumes are calculated based upon the existing ground surface elevation. The contractor must account for the differential cost of excavation and embankment in the cost of soil improvement Addendum No.10  CONSTRUCTION OF THE NORTH BAY ROAD PEDESTRIAN EMERGENCY BRIDGE  CITY RFP NO. 14‐09‐01        3      Q6: Document 00300 Bid Form 1. A) 1 indicates ………the base contract for the lump sum prices with schedule of values which includes the entire project except for the following items: Install asphalt pavement, sidewalks and stormwater drainage. These items are included in the schedule of values. Please clarify this is confusing. A6: Please see attached revised Table 1, MAJOR ITEM SCHEDULE OF VALUES. Q7: Please clarify the requirements for vibration monitoring for this project. A7: The purpose of the vibration monitoring is to protect the contractor from claims of inadvertent damage to nearby private properties resulting from construction activities. The extent of monitoring during appropriate phases or elements of construction is to be determined by the contractor and shall conform to FDOT requirements. See Note 10 on Sheet B-11 of the Bridge Drawings. Q8: Will the contractor be required to supply a Builders Risk insurance policy? A8: Please refer to RFP Section 2.10 Insurance. Q9. Section 6, Bid Submittal Forms, page 22 of the RFP, refers to an excel form to be inserted, we have not received this form, when will it be issued? A9: See attached Table 1 MAJOR ITEM SCHEDULE OF VALUES. Q10: Does the concrete for the structure have to be FDOT certified? A10: Yes. Q11: There is no requirement for an Engineer’s Field Office or Trailer, please confirm that we are not to provide one as part of our bid price. A11: The contractor will be allowed to occupy a portion of the North Bay Road right of way from Station 26+00 south to the canal, outside the limits of the 174th St drainage improvements referenced in Q2). This area can be used for staging, storage of non-hazardous materials, and for a required construction trailer to be used for maintaining record drawings and documentation as well as hosting periodic site meetings during construction. This trailer shall have electrical service, Addendum No.10  CONSTRUCTION OF THE NORTH BAY ROAD PEDESTRIAN EMERGENCY BRIDGE  CITY RFP NO. 14‐09‐01        4      space for maintenance of project drawings and records and at a minimum a suitably sized conference table and sufficient chairs for up to five (5) persons in addition to contractor staff. The overall area is to be secured as needed with perimeter fence and screening and be kept in a neat and orderly manner at all times. The exact limits of this area shall be coordinated upon mobilization to address needed access for a contractor who may be under construction of drainage improvements in NE 174 Street and a portion of North Bay Road. Q12: The MSE Wall Plans on BW-2, show the begin south MSE wall station as 21+29.73, and BW-3 show end north MSE wall at stations 24+90+00 and 25+00+00. This does not match the roadway plans which show south MSE wall limits at stations 20+34.17 and 20+60.14, and north MSE wall limits at 26+23.96. Please clarify which is correct. The MSE Wall Plans on BW-2, show the begin south MSE wall station as 21+29.73, and BW-3 show end north MSE wall at stations 24+90+00 and 25+00+00. This does not match the roadway plans which show south MSE wall limits at stations 20+34.17 and 20+60.14, and north MSE wall limits at 26+23.96. Please clarify which is correct. A12: The limits of the MSE wall shown on the Roadway and Bridge Drawings have been revised, please see the attached plan sheets. Q13: The bridge plan B-5, show variable height median barrier wall beyond the MSE wall limits per FDOT index 410. This index allows a four foot maximum height differential which will be exceeded per the elevations shown on plan sheets BW-2 and BW-3. Please clarify whether this index will be allowed for height differentials exceeding four feet. A13: The limits of the wall have been revised so that no portion exceeds four (4) feet in height. See revised plan sheets. Q14: Plan sheet B-4 requires an ADA rail on one bridge barrier, the ADA rail is not shown on the approach slab plan (see B-68) or on the roadway cross sections. Please clarify that the ADA rail is only on the bridge. A14: In addition to the bridge barrier, railings are required for the Approach Slab & MSE Walls that shall terminate at an appropriate location above adjacent grade. Addendum No.10  CONSTRUCTION OF THE NORTH BAY ROAD PEDESTRIAN EMERGENCY BRIDGE  CITY RFP NO. 14‐09‐01        5      Q15: The drilled shaft plans (sheets B-6 through B-11) do not indicate any load tests being required for the foundation shafts. Please confirm that none are required. A15: Shaft capacity has been designed assuming shaft will be installed as per FDOT Standard Specifications without a load test. The Resistance Factor was used accordingly and as such a load test is not required. If considered necessary by the contractor, then the contractor can perform a load test without any additional cost or time to the project Q16: Will a “method shaft” be required for the drilled shaft foundations? A16: As per FDOT Standard Specifications, Method Shaft is required. Q17: Are SID tests required for the drilled shafts? A17: SID tests are not required. Q18: For any testing of drilled shafts, who is to provide for the inspection of the testing? A18: The City of Sunny Isles Beach shall provide for the inspection of the testing. Q19: If the Contractor elects to utilize permanent casing for the drilled shafts, is there a required cutoff elevation of the casing? A19: If the Contractor elects to use permanent casings for drilled shafts, the cutoff elevation shall be two (2) feet below the mudline. Q20: Please clarify that the Contractor is to provide QC testing for concrete, and that the Owner will provide QA testing and inspection. A20: The contractor shall provide QC testing for concrete and the Owner shall provide QA testing and inspection. Addendum No.10  CONSTRUCTION OF THE NORTH BAY ROAD PEDESTRIAN EMERGENCY BRIDGE  CITY RFP NO. 14‐09‐01        6      Q21: The schedule of values, Item 37, indicates 40 LF of turbidity barrier. Sheet 26, Storm water Pollution Plan, indicate a much larger quantity being required. Please clarify. A21: See attached Table 1 MAJOR ITEM SCHEDULE OF VALUES. Q22: The schedule of values, Item 80, requires 300 LF of decorative fence with gates, please clarify where the fence is located. A22: Please refer to the Roadway Plans Sheet 11 that states “Replace Existing Fence, Field Verify Limits. Match Existing”. Q23: Please clarify whether this Contract is LUMP Sum or Lump Sum with Unit Pricing per the schedule of values, (i.e. Lump Sum for the Bridge and Approaches and Unit Price for the Roadway items). It’s not clear what the term “Lump SUM Price with Schedule of Values” means that is referred to in the bid form (Document 003300 – sheet 00300-1). A23: The contract is lump sum with the Schedule of Values to be used as the basis for additions and/or deletions. Q24: After carefully reviewing all project specifications, by hiring a subcontractor with extensive bridge experience who will be performing the majority of the construction, meet or oversee the Contractors qualification stated in section 4.2 of the project manual? A24: The City intends to award to the contractor it determines to be the most responsive and responsible. END OF SECTION Table 1 MAJOR ITEM SCHEDULE OF VALUES ITEM No.DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL ITEM AMOUNT GENERAL 1 Mobilization 1 LS 2 Maintenance of Traffic 1 LS 3 Clearing and Grubbing 0 AC 4 NPDES Compliance 1 LS 5 Remove Existing Asphalt Pavement 1,390 SY 6 Remove Existing Concrete Sidewalk 711 SY 7 Remove Existing Concrete Curb 1,084 LF 8 Remove Existing Pipe 98 LF 9 Remove Existing Yard Drain 2 EA 10 Remove Existing Parking Meters 12 EA 11 Remove Existing Sign 12 EA 12 SUBTOTAL GENERAL 13 SITE WORK AND PAVEMENT 14 1 1/2" Asphalt (S-1)158 TON 15 1" Asphalt (S-3)105 TON 16 5" Type B 12.5 Coarse Mix Asphalt 1,526 SY 17 4" Limerock Base (Optional Base Group 1)1,871 SY 18 12" Subgrade 1,884 SY 19 Stamped Asphalt 45 SY 20 Paver Brick 62 SY 21 F" Curb 561 LF 22 Drop Curb 46 LF 23 2' Header Curb 17 LF 24 E' Curb 18 LF 25 D' Curb 22 LF 26 6" Concrete Sidewalk 606 SY 27 Handicap Ramp 4 EA 28 Stabilized Fire Access Route 80 SY 29 Removeable Bollards 6 EA 30 Replace Existing Fence (Match Existing)1 LS 31 FDOT Index Fence 'B'55 LF 32 Finish Grading 1,150 SY 33 Cut 167 CY 34 Fill 887 CY 35 Sod 1,150 SY 36 Silt Fence 1,399 LF 37 Turbidity Barrier (Floating)1 LS 38 Inlet Protection 15 EA 39 SUBTOTAL SITE WORK AND PAVEMENT SIGNING AND PAVEMENT PARKINGS 40 Sign (FTP-65-06, 36" x 18")4 EA 41 Sign (R1-1, 30" x 30")1 EA 42 Sign (R5-1, 30" x 30")4 EA 43 Sign (R1-6, 12" x 36")1 EA 44 Sign (OM4-1, 18" x 18")2 EA 45 Sign (R3-2, 24" x 24")2 EA 46 24" Solid White Pavement Marking (Paint)14 LF 47 12" Solid White Pavement Marking (Paint)125 LF 48 6" Solid White Pavement Marking (Paint)10 LF 49 18" Solid Yellow Pavement Marking (Paint)90 LF 50 6" Solid Yellow Pavement Marking (Paint)290 LF 51 Turn Arrow (White Paint)2 EA 52 Message (White Paint)1 EA 53 Remove Existing Pavement Marking (24" Solid White)104 SF 54 Remove Existing Pavement Marking (6" Solid White)33 SF 55 Remove Existing Pavement Marking (White Arrow)10 SF 56 Detectable Warning Marking 4 EA 57 SUBTOTAL SIGNING AND PAVEMENT MARKINGS 58 DRAINAGE 59 Manhole (P-7)2 EA 60 Curb Inlet (J-7)1 EA 61 Inlet (Type 'C')1 EA 62 Inlet (Type 'H') (Control Structure)1 EA 63 Yard Drain (24" Nyloplast ADS)2 EA 64 18" RCP 117 LF 65 18" PVC 61 LF 66 12" x 18" RCP 391 LF 67 Remove Curb Inlet Top & Replace with Manhole Top 1 EA 68 Remove Curb Inlet Top & Replace with Curb Inlet Top 1 EA 69 Remove Manhole Top & Replace with Curb Inlet Top 1 EA 70 Adjust Curb Inlet to Grade 1 EA 71 5' x 4' Exfiltration Trench 356 LF 72 Core Existing Manhole (18" RCP)1 EA 73 SUBTOTAL DRAINAGE 74 BRIDGE 75 South Bridge Approach (Sta 20+54.14- 21+29.73)-(inclusive of all excavation, soil remediation, compaction, testing, hauling/disposal of unsuitable material, MSE walls purchase and installation, concrete work and asphalt) 1 LS 76 North Bridge Approach -(STA 24+54.15- 26+29.96) (inclusive of all excavation, soil remediation, compaction, testing, hauling/disposal of unsuitable material, MSE walls purchase and installation, concrete work and asphalt) 1 LS 77 FDOT Bridge Approach to Approach (Sta 21+29.73-24+54.15)1 LS 78 Labor and Material to F&I all electrical components per plans 1 LS 79 F&I Type B Fencing FDOT Index 802 105 LF 80 F&I Decorative Vertical Fence to Match Existing w/ Double Traffic Gate and Single Ped Gate 300 LF 81 SUBTOTAL BRIDGE TOTAL BASE BID (ITEMS 1 THROUGH 81)$ We have included herewith, the required security Bid Bond, as required by the Instruction to Bidders. All applicable federal state and local taxes and permit fees are included in the Bid Price. Permit fees shall be in accordance with the Owner's rate schedule. All unit rates are inclusive of all material, labor, equipment, excavation, handling, rehandling, temporary storage of material, installation, backfill, testing, compaction, hauling/disposal of any unsuitable material and restoration of any affected areas. (*) Grand total must equal amount shown on line "TOTAL LUMP SUM BID PRICE WITH SCHEDULE OF VALUES OF:" on Bid Form for Section 1. PLANVaries LFC RFC LGL TYPICAL CROSS SECTION Spans No. 1 & 5 Varies Varies Varies 1'-6" 13'-6" & P.G.L. À Construction 1'-1" SECTION A-A & P.G.L. À Const. 1'-6•"13'-6"Varies LFC LGL PGL PGL RGL RFC LEGEND TABLE OF FINISH GRADE ELEVATIONS A B CPOINTS NOTES APPROACH SLAB Bm. 1-A Bm. 1-B Bm. 1-C Bm. 1-D TABLE A ANGLES ÐDESIGNATION BEAM Slope: 2%Slope: 2% Span No. 1 TABLE OF FINISH GRADE ELEVATIONS 1 2 POINTS 3 SPAN NO. 1 SPAN MID- TPL (Showing location of Finish Grade Elevation Points) (Showing location of Finish Grade Elevation Points) PC N BRIDGE BEGIN NO. 2 Â BENT BRIDGE BEGIN APP. SLAB BEGIN A A D i r e c t io n o f S t a t i o n in g JOC 6-09 LFC LGL 1 3 ' - 6 " Radial Dimensions See TABLE A for Angles at each beam. Mid-Span 1 2 3 A B C Ð Â Bm. 1-A Â Bm. 1-B Â Bm. 1-C Â Bm. 1-D Curve 1 & P.G.L. À Construction LFC LGL RGL RFC T. to C. 90°00' 00" Sta. 21+29.73 Begin Approach Slab J o in t O p e n TPL RFC T. to C. 78°11' 22" 22 Jo i n t Open T. to C. 66°13' 19" FINISH GRADE ELEVATIONS (1 OF 5) 39'-10„" 1 2 '- 2 „ " 1 2 '- 2 „ " 1 2 '- 2 „ " 9 … " 3 0' - 0 „ " 1 0 '- 6 ‡ " 1 3 '- 9 ‡ " 1 0 '- 6 ‡ " 9 0 ° 0 0' 0 0 " 1 7 '- 0 „ " 1 '- 6 • " Â Bm. -A Â Bm. -B Â Bm. -C Â Bm. -D see Plan Drawings. : For Beams prefix (Span No.) 99°41' 30" 69°54' 07" 72°22' 02" 74°49' 17" 77°16' 51" 72°43' 14" 75°11' 08" 77°38' 23" 80°05' 58" 1 4 '- 1 0 ƒ " 1 '- 8 † " 1 ' - 1 " 71°40' 24" 20'-6" Rt. Sta. 21+61.89 POT T. to C. 79°51' 21" 1 0 '- 6 ‡ " 1 '- 3 ƒ " T R B 1 ' - 6 " Arc Dim. 6'-5"33'-5„" 39'-10†" LFC Dimension along Span No. 2 thru 5 : Parallel to Begin Span Bent. Span No. 1 : Parallel to Front Face of Backwall. set as follows: are equally spaced along À Construction & PGL and intermediate finish grade elevations on bridge slabs 3) Divider Lines (marked with circles and numbers) for b) At End Bridge: Parallel to End Bridge. a) At Begin Bridge: Parallel to Begin Approach Slab. the Approach Slab limits and set as follow: are equally spaced along À Construction & PGL within intermediate finish grade elevations on approach slabs 2) Divider Lines (marked with circles and letters) for 1) For additional geometric data, see Sheet No. B-5. T. to C. 63°47' 24" T. to C. 77°02' 38" 111°08' 43" 1 3 '- 9 ‡ " 6 '- 5 • " Elevations at top of riding surface. B-24 SP JOC 4 0 '- 5 " 1 '- 1 1 … " 3 Spaces (Varies) MDS 1 '- 1 1 ‚ " 1 '- 8 ‚ " Left Gutter Line Dimensions along 30 '-5†"39'-8…" Ñ V a r i e s Ñ 8 " S l a b Pedestrian TPLDimensions along 3 '- 7 ‡ " Wall, Typ. MSE Ret. 2 5 '- 6 ‚ " 9.343 9.371 9.442 9.172 9.141 RFC RGL PGL LGL LFC RFC TPL BM 1-D BM 1-C PGL BM 1-B BM 1-A LGL LFC 10.269 10.290 10.337 10.631 10.880 10.861 10.767 10.757 10.726 10.673 10.706 10.761 11.092 11.355 11.338 11.282 11.280 11.270 11.071 11.106 11.165 11.534 11.830 11.822 11.806 11.806 11.807 11.446 11.483 11.547 11.951 12.305 12.305 12.331 12.334 12.347 11.860 11.882 11.947 12.365 12.780 12.780 12.810 12.817 12.825 TRB : Traffic Railing Barrier RFC : Right Face of Coping TPL : Toe of Parapet Line PGL : Profile Grade Line LGL : Left Gutter Line LFC : Left Face of Coping Sta. 21+60.00 Begin Bridge Sta. 22+00.00 Â Bent No. 2 9.687 9.719 9.801 9.565 9.539 10.022 10.057 10.161 9.959 9.937 10.345 10.383 10.520 10.354 10.336 10.652 10.693 10.880 10.757 10.726 1 3 ' - 6 " 13'-6" Shoulder Edge of Shoulder Edge of 1'-5‚" 1 '- 5 ‚ " 7-09 4-09 7-09 Varies 2 0 '- 1 0 ƒ " •" NORTH BAY ROAD BRIDGE By Description REVISIONS Checked by Checked by Names Dates Drawn by Designed by PROJECT NAME: SHEET TITLE: Approved by Date By DescriptionDate SHEET NO. 1/27/2015 11:03:11 AM S:\Projects\SunnyIslesPedestrianB_NorthBay\NB_Bridge\struct\B1FinishGrEL01.dgncrodriguez APPROVED BY DATE CITY OF SUNNY ISLES BEACH PUBLIC WORKS DIVISION S. SADOUGH ENGINEER OF RECORD: (954) 334-9000 FAX (954) 334-2800 510 Shotgun Road Suite 400 Sunrise, FL 33326 SOHEILA SADOUGH, P.E. NO. 44130 AZTEC ENGINEERING GROUP, INC. Certificate of Authorization No. 28339 TM .'0)6*1(241,'%6 .+0'#4(''6 /+.'5 41#&9#; $4+&)'5  0'6.'0)6*1(241,'%6  ':%'26+105  )4155.'0)6*1(241,'%6  Certificate of Authorization 514 R www.callsunshine.com GRAND TOTALS - SUMMARY OF DRAINAGE STRUCTURES SUMMARY OF DRAINAGE STRUCTURES NORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM R www.callsunshine.com R www.callsunshine.com ROADWAY PLANNORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM R www.callsunshine.com ROADWAY PLANNORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM R www.callsunshine.comNORTH BAY ROAD BASELINE - STA. 20+00.00 TO STA. 24+80.00 SCALE:1" = 20' HORIZ. 1" = 2' VERT. -4 -2 4 6 0 2 12 14 16 18 20 22 8 10 -6 -8 -10 24 26 ROADWAY PROFILENORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM R www.callsunshine.com ROADWAY CROSS SECTIONSNORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM R www.callsunshine.com ROADWAY CROSS SECTIONSNORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM R www.callsunshine.com ROADWAY CROSS SECTIONSNORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM R www.callsunshine.com ROADWAY CROSS SECTIONSNORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM R www.callsunshine.com ROADWAY CROSS SECTIONSNORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM R www.callsunshine.com ROADWAY CROSS SECTIONSNORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM R www.callsunshine.com ROADWAY CROSS SECTIONSNORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM R www.callsunshine.com ROADWAY CROSS SECTIONSNORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM R www.callsunshine.com STORMWATER POLLUTION PREVENTION PLAN NORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM ROADWAY CROSS SECTIONSNORTH BAY ROAD PEDESTRIAN AND EMERGENCY ACCESS BRIDGE SUNNY ISLES BEACH, FLORIDA TM