Addendum No. 3
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CITY RFP NO. 14-11-01
To All Bidders:
Bidders for the above referenced project shall take note of the following changes, additions,
deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the
Contract Documents shall become a part of and have precedence over anything shown or
described otherwise.
Questions/Clarifications:
1. Can you provide your anticipated budget?
Response: A budget is intentionally not provided and we ask that proposers price the
project accordingly based on their expertise.
2. Is there any page limitation for the response to this RFP?
Response: Emphasis is to be made on the quality of the response and not quantity.
3. Under Section 5, Item 5 – Cost of Services, it does not reference whether the price should
be in a sealed envelope. Please clarify.
Response: All price proposals shall be in a sealed envelope.
4. Asphalt Thickness: While reviewing the borings, I was unable to find the thickness of the
existing asphalt. Please provide depth for pricing purposes.
Response: Noted. According to the geotechnical report, 3” – 4” of pavement thickness
was encountered in the borings as stated on Page 5 of Wingerter Laboratory’s report.
Please refer to Attachment B of the bid documents.
5. Muck Removal: The borings shows that muck is existing throughout the
neighborhood. However, I was unable to find any details regarding muck removal. Could
Addendum No. 3 ‐ Bidder Questions and Responses
NE 174TH STREET ROADWAY IMPROVEMENTS
CITY RFP NO. 14‐11‐01
2
you please advise how much muck removal will be required when it is encountered – 30‐
inches, 36‐inches, complete removal, etc.
Response: Please refer to Attachment B and Technical Specifications provided.
6. Bid Proposal Form: Is the bid proposal form available in either excel or word format?
Response: No. However, those with Adobe writer should be able to copy and convert the
table to an Excel sheet for their in‐office use. The bid shall be submitted in the form
provided by the City. Any attempt to alter, modify, or enhance this form may result in a
disqualification of your bid.
7. Off‐Duty Officers: Please add an allowance line item for off‐duty officer, since the
requirement for this service is unknown at this time.
Response: The estimated cost per hour has been provided in the RFP. The need for off‐
duty police support is at the sole discretion of each prospective bidder based on their
proposed construction methodology and MOT plan to be implemented. Bidders are
advised to carefully consider these factors and make the necessary allowances within the
line item provided for Maintenance of Traffic currently provided in the bid form. Note that
all road closures, full and partial, shall require coordination with first responder services.
8. In reading the Bid Proposal Form Page 36 Notes, the note seems to indicate that it is both
a lump sum project and unit price project. Could you please clarify whether this will be
a unit price project, lump sum project or Guaranteed Maximum Price?
Response: The bid has unit prices as well as lump sum prices. Lump sum prices are fixed
and unit prices can have over or under‐runs. Furthermore, payment for pipe will be based
on field measured‐installed quantities; from inside wall to inside wall.
9. On the summary of the Prebid meeting, the City is requesting an Off‐Duty Police Officers
but the Contractor does not know, when, where, how many and how much time the city
will request it. It is very difficult to calculate the number of hours and some Contractors
assumes a few and others a lot. We believe that is fair that the City include an item with
an Allowance or Estimate a number of man hours for Police Officers and use them a
discretion of the City, thereby everybody is in the same page .
Response: See response to item no. 7.
10. The Item # 74 says, “Installation of Bus Shelters….” ( C‐31 ). That means, Furnish and
Install, right? And reinstall the existing benches and waste trash, right? (Sta 36+00 and
Addendum No. 3 ‐ Bidder Questions and Responses
NE 174TH STREET ROADWAY IMPROVEMENTS
CITY RFP NO. 14‐11‐01
3
26+00 approx.). The existing shelters needs to be removed and salvaged to the City?
Please advise.
Response: Installation of bus shelters does mean furnish and install. The Contractor shall
be responsible for coordinating with the Bus shelter provider for provision of any and all
engineering services required for installation of the proposed shelters. Existing benches
and trash bins are to be protected and reinstalled. All shelters removed from within the
project area shall be hauled away by the successful Contractor to the City’s Public Works
facility located beneath the William Lehman Causeway.
11. Under Section 5 Qualifications, it references proposer’s relevant experience. Should
experience in coastal projects be a requirement to qualify?
Response: It is not a requirement. However, such experience would be looked upon as a
plus though it will not be the determining factor.
Please be advised that Civil plan sheets C‐14 to C‐16 and C‐30 have been revised.
RER permit Number CLII‐20140027 for the project has been included herein.
Landscape and Irrigation Plan sheets have been revised and are included as part of this RFC for
contractor reference.
A revised bid form has been provided.
END OF SECTION
|Request for Proposal No. 14‐11‐01 1
BID PROPOSAL FORM
(Revised 12/04/14)
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
The lump sum (LS) prices for items 1 through 10 shall be done in accordance with the contract documents and
specifications and all applicable federal, state, and local requirements. Costs for pre-construction video survey are to
be incorporated into item 1.
1 Mobilization and Demobilization (5%) 1 LS
2 Maintenance of Traffic Including
Construction Sequencing 1 LS
SUBTOTAL ITEMS 1-2 $_____________
The lump sum (LS) price for (phased) clearing & stripping shall include but not be limited to temporary storage, removal
and proper disposal of existing ground coverings, bus shelters, asphalt pavement, sidewalks, curb & gutter, concrete
pavement, limerock and subgrade (where applicable), and/or all other organic material from right of way to right of way
as necessary to perform the work stipulated in these contract documents. The lump sum price shall also include but not
be limited to removal, protection, storage of existing signs, decorative stone, landscaping, and sprinkler systems existing
within the work zone. All items shall be restored to as existing (such as existing pavers) or better condition and as per
plans.
|Request for Proposal No. 14‐11‐01 2
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
3 Clearing and Stripping 1 LS
4 NBR- North Bay Road South of NE 174th
Street Clearing and Stripping 1 LS
5 Laboratory Testing 1 LS
6 Survey Stakeout & As-builts 1 LS
7
Stormwater Pollution Prevention Plan
(Required) & NPDES Permitting &
Monitoring where applicable
1 LS
SUBTOTAL ITEMS 3 - 7 $_____________
LANDSCAPE AND IRRIGATION ITEMS 8 – 9
|Request for Proposal No. 14‐11‐01 3
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
The price for each item shall include but not be limited to all labor, equipment and materials necessary to install and
construct these items in accordance with these contract documents. All landscaping unit prices shall include soil
amendments needed i.e. mulch, soil, fertilizer and installation.
8 AFI – Annual Flower. 12” SPR Pots 12” O.A,
12” O.C. Selection by LA at time of Planting 1,950 EACH
9 BK14 – Bismarkia Nobilis Silver. Specimen
14’ – 16’ CT Matched 64 EACH
10 CN3 – Codiaeum “Norma” Croton Norma.
24” HT, 12” wide, 18” OC, 3 gal. 24” O.C 2,831 EACH
11 FM3 – Ficus Microcarpia Green Island Ficus.
18” SPR. 3 gal. Full pot, 24” O.C 3,905 EACH
12 IV3-Ilex Vomitoria Schellings Dwarf. 12” HT,
12-18” SPR., 24” O.C 315 EACH
13
PD37 – Phoenix Roebelinii Pygmy Date
Palm, Triple. 6’ OA. Min Double, 5’ & 3’ CT,
field grown
6 EACH
|Request for Proposal No. 14‐11‐01 4
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
14 PHD14 – Phoenix Dactylifera Medjool Date
Palm. 28’ O.A. Min matched specimen palms 13 EACH
15 Hunter DUAL-1 decoders and DUAL-S:
Locate at each valve. Installed per spec. 13 EACH
16
Hunter IC-600-pl Dual 48M, DUAL-1:
Decoders and DUAL-S with 2-wire decoder
controller with 48 station capacity, plastic
pedestal, ACC-PED. locate at each valve,
installed per spec.
1 EACH
17
Hunter Solar-Sync SEN:
Solar, rain freeze sensor with outdoor
interface. Connects to Hunter PCC, Pro-C,
and I-Core Controllers, install as per
manufacturer’s instructions. Wired and
installed per spec.
1 EA
18
Irrigation Lateral Line:
PVC Class 160 SDR 26PVC Class 315 for
1/2" pipe, PVC Class 200 for 3/4" pipe, PVC
Class 160 SDR 26 for 1" and above.
Installed per spec.
6,500 LF
|Request for Proposal No. 14‐11‐01 5
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
19
Irrigation Mainline:
2 1/2" PVC Class 200 SDR 2 PVC Class 200
irrigation pipe. Installed per spec.
1,800 LF
20
Irrigation Pipe Sleeve:
HDPE PE4710 DR 11 (202psi). Installed per
spec.
560 LF
21
Nibco T-113-K Class 125 bronze gate Valve:
Includes shut off valve with cross handle,
same size as mainline pipe diameter at valve
location. Size Range - 1/4" - 3" and installed
per spec.
1 EACH
22
Rain Bird 1806-SAM-PRS 5 Series MPR
Stream Bubbler:
Place on riser with pressure regulation
nozzle for spacing as shown on plans, and
installed per spec.
551 EACH
23
Rain Bird PGA-PRS-D- Globe Electric
Remote Control Valve, Globe. With
Pressure Regulator Module: Electric w/ 24V
Solenoid - 2" Installed per spec.
EACH 13
|Request for Proposal No. 14‐11‐01 6
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
24
RAINBIRD 1806-SAM-PRS SERIES:
Flat Trajectory Nozzles 12" commercial pop-
up on riser nozzle as shown on plans and
installed per spec.
EACH 314
25
Reconnect proposed irrigation system to two
(2) existing 2" City Water Meter and meter
enclosure per plan specifications.
LS 1
SUBTOTAL LANDSCAPE AND IRRIGATION ITEMS 8 - 25 $_____________
ROADWORK ITEMS 26 – 51
The price for each road work item shall include but not be limited to all labor, equipment and materials necessary to
install and construct these items in accordance with these contract documents.
26 Striping (Thermoplastic) 1 LS
27 NBR - Striping (Thermoplastic) 1 LS
|Request for Proposal No. 14‐11‐01 7
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
28 Striping (Green Colored Pavement - Per
MUTCD) 1 LS
29 1" Milling of Existing Road for NE 174th
Street West of North Bay Road 5,209 SY
30 NBR - 1" Milling of Existing North Bay Road
South of NE 174th Street 1,056 SY
31 1" SP-9.5 Asphalt Overlay in Milled Road
Section West of N. Bay Road 5,209 SY
32
NBR - 1" SP-9.5 Asphalt Overlay in Milled
North Bay Road Section South of NE 174th
Street
1,056 SY
33 3" Type SP-9.5 Asphalt (2 Equal Lifts) for
Reconstructed Road East of N. Bay Road 9,243 SY
34 12" Limerock Base Course for Road
Reconstruction (98% Compacted) 10,186 SY
|Request for Proposal No. 14‐11‐01 8
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
35 12" Subbase Course for Road
Reconstruction (95% Compacted) 13,257 SY
36 Tencate Mirafi RS380i (15' x 300' Roll) 23,357 SY
37 FDOT F-Curb 3,476 LF
38 NBR - FDOT F-Curb 250 LF
39 NBR - FDOT D-Curb 52 LF
40 Modified FDOT F-Curb 3,213 LF
41 2' Valley Gutter 396 LF
|Request for Proposal No. 14‐11‐01 9
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
42
5' Wide x 6" Thick Concrete Sidewalk (3000
psi) including H/C Sidewalk Ramp as Per
Plans
1,948 SY
43
NBR - 5' Wide x 6" Thick Concrete Sidewalk
(3000 psi) including H/C Sidewalk Ramp as
Per Plans within North Bay Road South of
NE 174th Street
139 SY
44 Detectable Warning Surfaces 32 EA
45 NBR - Detectable Warning Surfaces within
North Bay Road south of NE 174th Street 1 EA
46
Furnish and Install Paveway STS® System
(Intersection & Crosswalk) Ruby - Diagonal
Herringbone w/Soldier Course Border
1 LS
|Request for Proposal No. 14‐11‐01 10
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
47
Install 3" Speed Humps 12' Long (widths
vary) with Pavement Markings as per plans
(varying widths)
9 EA
48 Reinstall/Relocate Existing Signs 1 LS
49 NBR - Reinstall/Relocate Existing Signs 1 LS
50 Install New Speed Hump Signs (W17-1);
Poles to Match Existing Poles 1 EA
51 Reinstall Existing Bollards 1 LS
SUBTOTAL ROADWORK ITEMS 26 - 51 $_____________
STORMWATER STRUCTURES ITEMS 52 – 61
|Request for Proposal No. 14‐11‐01 11
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
The price for each drainage structure construction item shall include but not be limited to all labor, equipment and
materials necessary to install and construct these items in accordance with these contract documents which include all
saw cutting, asphalt removal and disposal, excavation, de-watering where applicable, de-watering & NPDES permits,
including the required construction of best management practices to maintain turbidity within the required NPDES
standards during the duration of the project, bedding material, backfill base material, sodding, curbing, sidewalk, backfill
limerock base material, compaction, material to be restored to same elevation as existing asphalt pavement (grade to
slope) grading, testing, inspections and any other miscellaneous work.
52 Curb Inlet Type 5 w/Round Bottom & USF
5160-5310 4 EA
53 Curb Inlet Type 6 w/Round Bottom & USF
5160-5310 9 EA
54 J7 Manhole w/48" Square Bottom & USF 580 3 EA
55 Type 7 Manhole w/48" Round Bottom & USF
580 8 EA
56 Type 7 Manhole w/60" Round Bottom & USF
580 1 EA
|Request for Proposal No. 14‐11‐01 12
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
57 Type 7 Manhole Top w/USF 580 2 EA
58 FDOT Type C Inlet w/USF 5112-6143 4 EA
59 6' x 6' Manhole Control Structure W/USF 580
(2) & Concrete Weir 1 EA
60 NBR - Modified Type E Inlet w/USF 6608 1 EA
61 6' Diameter Downstream Defender 1 EA
SUBTOTAL STORMWATER STRUCTURES ITEMS 52 - 61 $_____________
STORMWATER PIPES 62 – 67
The price for each drainage pipe construction item shall include but not be limited to all labor, equipment and materials
necessary to install and construct these items in accordance with these contract documents which include all saw cutting,
asphalt removal and disposal, excavation, de-watering where possible, de-watering & NPDES permits, including the
|Request for Proposal No. 14‐11‐01 13
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
required construction of best management practices to maintain turbidity within the required NPDES standards during
the duration of the project, bedding material, backfill base material, sodding, curbing, sidewalk, backfill limerock base
material, compaction, material to be restored to same elevation as existing asphalt pavement (grade to slope) grading,
testing, inspections and any other miscellaneous work.
62 15" A2000 PVC 406 LF
63 18" A2000 PVC 380 LF
64 24" A2000 PVC 696 LF
65 30" A2000 PVC 383 LF
66 36" A2000 PVC 534 LF
67 36" Checkmate Valve w/316 SS Clamp 1 EA
|Request for Proposal No. 14‐11‐01 14
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
SUBTOTAL STORMWATER PIPES ITEMS 62 - 67 $_____________
UTILITIES 68 – 73
The price for each construction item shall include but not be limited to all labor, equipment and materials necessary to
install and construct these items in accordance with these contract documents which include all saw cutting, asphalt
removal and disposal, excavation, de-watering where possible, de-watering & NPDES permits, including the required
construction of best management practices to maintain turbidity within the required NPDES standards during the duration
of the project, bedding material, backfill base material, sodding, curbing, sidewalk, backfill limerock base material,
compaction, material to be restored to same elevation as existing asphalt pavement (grade to slope) grading, testing,
inspections and any other miscellaneous work.
68 6" DIP WM Deflection (incl. Bends, fittings,
pipe) 1 EA
69 Modification of Existing Sanitary Manhole
Per MDC-WASD Standards 1 EA
70 Adjustment of Covers for Existing Utilities
(where necessary) 1 LS
|Request for Proposal No. 14‐11‐01 15
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
71 Deflection of Existing BCTV & Coordinate
w/Utility 4 EA
72 Deflection of Existing Buried Telephone,
FOC & Coordination w/Utility 1 EA
73 Deflection of Existing Buried Electric
(Conduit only not ductwork) 3 EA
SUBTOTAL ROADWORK ITEMS 68 - 73 $_____________
MISCELLANEOUS ITEMS 74 - 86
74
Installation of Bus Shelters (Contractor to
coordinate with Manufacturer for necessary
Engineered documents) w/necessary
concrete work to meet dimension
requirements and product specifications with
reinstallation of existing benches.
3 EA
|Request for Proposal No. 14‐11‐01 16
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
Include Coordination with Miami-Dade
County Transit for all work involving Shelters
and routes.
75 Removal/Disposal of Existing Drainage
Structure or Top 4 EA
76 Removal/Disposal of Existing Storm Pipe 529 LF
77
Installation of Traffic Signal Loop (to be
coordinated w/MDC-Traffic Engineering
w/MDC-Approved Contractor)
1 LS
78 Relocation of Existing Landscape Light Pole
(including electric) 2 EA
79 Installation of New Light Pole (including
electric) 2 EA
80 Core & Install Proposed Pipe to Existing
Seawall 1 LS
|Request for Proposal No. 14‐11‐01 17
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
81 Connect Existing Drainage to Proposed
Drainage 2 EA
82
Remove Existing Parking Meters; Electric,
Irrigation, & Sod to be included within North
Bay Road South of NE 174th Street
1 LS
83
Reinstall Existing Parking Meters; Electric,
Irrigation, & Sod to be included within North
Bay Road South of NE 174th Street
1 LS
84 Desilting of Existing Drainage 1 LS
85 NBR - Remove and Replace Existing Conc.
Post & Reinstall Guardrail 1 LS
86 Furnish & Install Manatee Grate 1 LS
SUBTOTAL MISCELLANEOUS ITEMS 74 - 86 $_____________
|Request for Proposal No. 14‐11‐01 18
CITY OF SUNNY ISLES BEACH
NE 174TH STREET ROADWAY IMPROVEMENTS
CSIB RFP NO. 14-11-01
CAS PROJECT NO. 14-1758
BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE
A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM
AND/OR UNIT PRICES.
ITEM
NO DESCRIPTION QUANTITY UNIT
UNIT
COST TOTAL
BID SUBTOTAL (ITEMS 1 - 86) $_____________
87
Project Contingency
To be used at the sole discretion and
direction of the Owner.
1 LS 10%
88 Permit Allowance 1 LS - $15,000.00
89
Electrical contingency – For the
relocation/deflection of existing buried street
light conduit (in excess of that specified in
bid item #73) as reasonably necessary to
accommodate proposed improvements.
Shall be used solely at the discretion of the
City.
15
EA
$_______
(As stated
in Bid Item
#73)
BID TOTAL (1 – 89)
NOTE: The Quantities shown in this Bid Form are estimates only. They are generally representative of the work that will be
required by the Contractor. The Contractor shall be responsible for verifying all quantities prior to bid. The Contractor shall
ensure that ALL work for the proposed right-of-way improvements is completed for the TOTAL price submitted on this Bid Form.
The Bidder, by signing this Bid Form and Contract fully acknowledges that he/she will receive no additional compensation (no
overhead, no anticipated profits etc.), other than the bid unit price of these items times the number of items authorized, ordered,
installed and accepted by the City; unless it can be proven and agreed to in writing by the City that additional work is required
(prior to commencement of additional work).
ORLANDO A. RUBIO, P.E.
48265
CRAIG A. SMITH & ASSOCIATES
CONSULTING ENGINEERS-PLANNERS-SURVEYORS
NO.REVISIONDATE BY Checked:
Drawn:
Designed:
CAS PROJECT NUMBER
SHEET
FLORIDA PROFESSIONAL ENGINEER NO.
APPROVED BY:
DATE
PREPARED FOR:Date:
THE CITY OF
SUNNY ISLES BEACH
MIAMI-DADE COUNTY, FLORIDA
N.E. 174th STREET
ROADWAY IMPROVEMENTS
14-1758
02/19/14
OAR
MM
OAR PAVEMENT MARKING PLAN
2
>
%
K
V
K
G
U
A
8
K
N
N
C
I
G
U
A
6
Q
Y
P
U
>
5
W
P
P
[
A
+
U
N
G
U
A
$
G
C
E
J
>
Á
Á
5
7
0
0
;
+
5
.
'
5
Á
5
6
Á
5
9
Á
2
#
8
'
/
6
Á
+
/
2
>
Á
'
P
I
K
P
G
G
T
K
P
I
>
2
N
C
P
U
>
Á
Á
%
Á
Á
2
/
5
F
Y
I
#
/
O
O
C
T
G
P
E
Q
ORLANDO A. RUBIO, P.E.
48265
CRAIG A. SMITH & ASSOCIATES
CONSULTING ENGINEERS-PLANNERS-SURVEYORS
NO.REVISIONDATE BY Checked:
Drawn:
Designed:
CAS PROJECT NUMBER
SHEET
FLORIDA PROFESSIONAL ENGINEER NO.
APPROVED BY:
DATE
PREPARED FOR:Date:
THE CITY OF
SUNNY ISLES BEACH
MIAMI-DADE COUNTY, FLORIDA
N.E. 174th STREET
ROADWAY IMPROVEMENTS
14-1758
02/19/14
OAR
MM
OAR PAVEMENT MARKING PLAN
2
>
%
K
V
K
G
U
A
8
K
N
N
C
I
G
U
A
6
Q
Y
P
U
>
5
W
P
P
[
A
+
U
N
G
U
A
$
G
C
E
J
>
Á
Á
5
7
0
0
;
+
5
.
'
5
Á
5
6
Á
5
9
Á
2
#
8
'
/
6
Á
+
/
2
>
Á
'
P
I
K
P
G
G
T
K
P
I
>
2
N
C
P
U
>
Á
Á
%
Á
Á
2
/
5
F
Y
I
#
/
O
O
C
T
G
P
E
Q
ORLANDO A. RUBIO, P.E.
48265
CRAIG A. SMITH & ASSOCIATES
CONSULTING ENGINEERS-PLANNERS-SURVEYORS
NO.REVISIONDATE BY Checked:
Drawn:
Designed:
CAS PROJECT NUMBER
SHEET
FLORIDA PROFESSIONAL ENGINEER NO.
APPROVED BY:
DATE
PREPARED FOR:Date:
THE CITY OF
SUNNY ISLES BEACH
MIAMI-DADE COUNTY, FLORIDA
N.E. 174th STREET
ROADWAY IMPROVEMENTS
14-1758
02/19/14
OAR
MM
OAR PAVEMENT MARKING PLAN
2
>
%
K
V
K
G
U
A
8
K
N
N
C
I
G
U
A
6
Q
Y
P
U
>
5
W
P
P
[
A
+
U
N
G
U
A
$
G
C
E
J
>
Á
Á
5
7
0
0
;
+
5
.
'
5
Á
5
6
Á
5
9
Á
2
#
8
'
/
6
Á
+
/
2
>
Á
'
P
I
K
P
G
G
T
K
P
I
>
2
N
C
P
U
>
Á
Á
%
Á
Á
2
/
5
F
Y
I
#
/
O
O
C
T
G
P
E
Q
ORLANDO A. RUBIO, P.E.
48265
CRAIG A. SMITH & ASSOCIATES
CONSULTING ENGINEERS-PLANNERS-SURVEYORS
NO.REVISIONDATE BY Checked:
Drawn:
Designed:
CAS PROJECT NUMBER
SHEET
FLORIDA PROFESSIONAL ENGINEER NO.
APPROVED BY:
DATE
PREPARED FOR:Date:
THE CITY OF
SUNNY ISLES BEACH
MIAMI-DADE COUNTY, FLORIDA
N.E. 174th STREET
ROADWAY IMPROVEMENTS
14-1758
02/19/14
OAR
MM
OAR
STANDARD DETAILS
2
>
%
K
V
K
G
U
A
8
K
N
N
C
I
G
U
A
6
Q
Y
P
U
>
5
W
P
P
[
A
+
U
N
G
U
A
$
G
C
E
J
>
Á
Á
5
7
0
0
;
+
5
.
'
5
Á
5
6
Á
5
9
Á
2
#
8
'
/
6
Á
+
/
2
>
Á
'
P
I
K
P
G
G
T
K
P
I
>
2
N
C
P
U
>
Á
Á
%
Á
Á
&
6
.
5
F
Y
I
2
/
O
O
C
T
G
P
E
Q
9+68.88
174th Avenue
CL
CL
M
a
t
c
h
l
i
n
e
A
R/W
R/W
2
2
IV3
75
FM3
155
CN3
106
PHD14
3
AF1
75AF1
75
PD37
3
FM3
70
CN3
85
30' DIAMETER
LIGHT HALO
AF1
75
FM3
142CN3
100
BK14
3
BK14
12
BK14
16
FM3
716
CN3
442
AF1
75
AF1
75 AF1
75
FM3
244CN3
122
AF1
75
AF1
75
30' DIAMETER
LIGHT HALO
Master Plant List
AF1
75AF1
75
AF1 ANNUAL FLOWER 12"SPR. POTS. 12" O.A. 12" O.C.
1 GAL. SELECTION BY L.A. AT
TIME OF PLANTING
2100
BK14 BISMARCKIA NOBILIS
SILVER
SPECIMEN, 14'-16' CT MATCHED.
65
CN3 CODIAEUM "NORMA"
CROTON NORMA
24" HT, 12" WIDE, 18" OC 3 gal.
24" O.C 2831
FM3 FICUS MICROCARPA
GREEN ISLAND FICUS
18" SPR. 3 GAL. FULLPOT, 24"
O.C.3905
IV3 ILEX VOMITORIA
SCHELLINGS DWARF
12" HT. X 12-18" SPR.,
24" O.C.315
PD37 PHOENIX ROEBELENII
PYGMY DATE PALM,
TRIPLE"
6' OA., MIN. TRIPLE HDS.
5' to 3' CT.
FIELD GROWN
6
PHD14 PHOENIX DACTYLIFERA
MEDJOOL DATE PALM
28' O.A. MIN. 14' CT MATCHED
SPECIMEN PALMS 13
1
1
1
Accentuate utility service
lines
JS Revised for underground utilities 11-25-14 2
LANDSCAPE BID CONDITIONS
The quantities on the plant list are for the convenience
of the contractor only and not to be considered as the
final quantitiy for installation. The callouts and entities
drawn on the plans take precedence over the plant list.!
!
The contractor shall be responsable for his own takeoffs
of the plantings drawn.!
!
The contractor shall be expected to visit the site prior to
bid. the contractor shall have an understanding of the
on site conditions to prepare his bid. Any questions
concerning conditions are to be brought to the owners
attention prior to bid.!
!
Any discrepensies concerning the materials or
conditions of the site that shall inhibit the installation as
drawn shall be brought to the attention of the owners
representatives. Issues found prior to bid will become a
condition of the bid after the award of the contract.!
!
After the award of the contract, any discrepancies in the
plans or additional materials and costs because of
pre-existing conditions at the site shall not be a reason
for any additional charges to the owners.!
!
These bid conditions are not to be considered all
inclusive. There may be additional conditions included in
other documents of the construction agreement. It is the
contractors responsability to make himself and his
subcontractors aware of any other such conditions.!
!
1.
2.
3.
4.
5.
6.
See sheet L-5 for planting details and
specifications.
Notes Concerning Existing
Underground Electrical
Where in conflict, the contractor shall
adjust the existing underground
electrical wires to accomodate the root
ball in the aproximate locations shown.
Any divergence from the locations shall
be brought to the attention of the City
for approval prior to the installation of
any materials.
The relocation of any electrical shall be
included in the base bid as a seperate
item, (see bid form).
2
9+68.88
B B
EJB
EJB
EMH
WM
WM
ICV
FH
ICV
SMH
SMH
11+00
12+00
13+00
EMH
EJB
EJB
EJB
EMH
EJB
WM
ICV
FH
FH
WMWM
ICV
SMH
SMH
14+00
15+00
16+00
17+00
18+00
North!
Scale, 1"= 20'
ROW Line
ROW Line
ROW Line
ROW Line
EXISTING
LIGHT
LIGHT
LIGHT
LIGHT
LIGHT
10+00
M
a
t
c
h
l
i
n
e
A
M
a
t
c
h
l
i
n
e
B
M
a
t
c
h
l
i
n
e
B
M
a
t
c
h
l
i
n
e
C
FH
FH
CL
CL
CL
CL
174th Avenue
174th Avenue
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
LIGHT
B
G
WL
SN
S
SN
S
B
G
WL
R
C
T
V
BE BE BE BE BE BE
BE BE BE BE BE BE BE
BE
SAN
SNS
SAN
SL SL
SL SL
SL
SL SL SL SL SL SL SL
SL SL
SL SL
SL
SL
SL
SL SL SL SL
SL
SL
SL SL
SAN
SL SL SL
SAN SAN SAN
BE
BE
BE BE BE
BE
BE
BE
BE
BE
BE BE BE BE BE BE
BE
SLSLSL
SAN
SAN SAN SAN SAN SAN SAN
BT
WS
WS
SD
WS
WS
WS
BCTV
BTW
BCTV BCTV
BCTV
BCTV
BCTV BCTV BCTV BCTV
BCTV
BCTV
BCTV
BCTV
BCTV BCTV
BE
BE
BG
BG
BT BT BT BT BT BT BT BT BT BT BT BT BT BT
BT BT
WL
WL
SA
N
BE
BE
BG BG
BG
BG
BG
BG
BG
BG
BG
BG
BG
BG BG
BG BG BG BG BG
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT BT BT BT BT
WLWLWLWLWLWLWLWL
WL
WLWL
WL
WL
WL
WL
WL
WLWL
WLWL
WLWLWLWLWLWLWLWLWLWLWLWLWLWLWLWLWLWL
JS O'Leary Comments11-11-14 1
ROAD NO.COUNTY
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
FINANCIAL PROJECT ID
SHEET
NO.j a m e s s a n t i a g o
landscape architecture and design
612 NE 14th Ave. Unit A, Fort Lauderdale, Fl. 33304
Tel. 305-791-3156
Email, Jsantiagolainc@Gmail.com
!
174th Street Roadway Improvements!
The City of Sunny Isles Beach, Fl.!
Landscape Plan
SHEET L-1
Date: 8-25-14 Drawn By: JS
174th Avenue
174th Avenue
CL
2
2
IV3
60
FM3
116
CN3
85
PHD14
1
3' DIAMETER
LIGHT HALO
AF1
75
IV3
75
triple row
FM3
184
CN3
75
PHD14
3
BK14
8
30' DIAMETER
LIGHT HALO
AF1
75
BK14
3
FM3
115
CN3
108
AF1
75
AF1
75
AF1
75
AF1
75
FM3
502
CN3
385
AF1
75
AF1
75
PD37
3
JS Revised for underground utilities 11-25-14 2
Notes Concerning Existing
Underground Electrical
Where in conflict, the contractor shall
adjust the existing underground
electrical wires to accomodate the root
ball in the aproximate locations shown.
Any divergence from the locations shall
be brought to the attention of the City
for approval prior to the installation of
any materials.
The relocation of any electrical shall be
included in the base bid as a seperate
item, (see bid form).
2
EJB
EMH
EJB
EMH
EJB
EJB
ICV
ICV
WM
SMH
SMH
GSV GSV
GSV
19+00 20+00
21+00
22+00
4
2
+
0
0
4
3
+
0
0
44
+
0
0
EMH
EJB
EJB
EJB
EJB
EJB
EJB EJB
EJB EJB
EJB
FH
ICV
ICV
FH
WM
SMH
TMH
G
S
V
GSV
22+00
23+00
24+00
25+00 26+00
North!
Scale, 1"= 20'
ROW Line
LIGHT
LIGHT
LIGHT
EXISTING
LIGHT
LIGHT
M
a
t
c
h
l
i
n
e
C
M
a
t
c
h
l
i
n
e
D
M
a
t
c
h
l
i
n
e
D
Ma
t
c
h
l
i
n
e
E
CL
CL
CL
CL
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
174th Avenue
No
r
t
h
B
a
y
R
o
a
d
No
r
t
h
B
a
y
R
o
a
d
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE
BEBE BE BE BE <E><E><E><E><E>
SL SL SL SL SL SL SL
SANSANSANSAN
SAN SAN
SAN SAN SAN SAN SAN SAN SAN
SL SL SL SL SL SL SL SL SL SL SL
WL
WL
WL
BG BG BG
BGBGBGBG
BG BG BG BG
BGBGBGBGBGBG
BCTV
BCTV
BCTV BCTVBCTVBCTVBCTVBCTV
WL WL WL WL WL WL
WL
WL
SL
SL
SL
SL
S
L
S
L
S
L
S
L
BT BT BT BT BT BT BT BT BT BT BT BT BT BT BTWLWLWL
WL WL WL WL WL WL
SL
WL
BT
SL SL SL SL SL SL SL
BT BT BT BT BT BT BT BT BT BT BT BT
BT
BT
WLWL
WL WLWLWLWLWLWLWLWLWLWLWLWLWLWL
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SAN
SAN SAN SAN SAN
BG BG BG BG BG BG BG BG BG BG BG BG BG BG BG BG BG BG
SA
N
BE
BE
GS
GS
GS
BE
SL
SL
SL
UN
K
UN
K
BT
BT
VAULT
WS
WS
SD
SD
SD
SD
BG
BG
BG
BE
BE
UN
K
UN
K
ROAD NO.COUNTY
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
FINANCIAL PROJECT ID
SHEET
NO.
!
174th Street Roadway Improvements!
The City of Sunny Isles Beach, Fl.JS O'Leary Comments11-11-14 1
j a m e s s a n t i a g o
landscape architecture and design
612 NE 14th Ave. Unit A, Fort Lauderdale, Fl. 33304
Tel. 305-791-3156
Email, Jsantiagolainc@Gmail.com Landscape Plan
SHEET L-2
155156157158159160161162163164165166167168
169
170
171172173174
175 176 177
069
178
046
047
048
049
ROW Line
ROW Line
Date: 8-25-14 Drawn By: JS
R/W
R/
W
R/
W
2
FM3!
375
CN3!
253 Seasonal color!
Mass to complete !
ends of islands!
coordinate selection with !
the landscap[e architect
BK14!
5
FM3!
288
30' DIAMETER
LIGHT HALO
FM3!
698
CN3!
69730' DIAMETER
LIGHT HALO
AF1
75
AF1
75
AF1
75
AF1
75
CN3
155
AF1
75
AF1
75
30' DIAMETER
LIGHT HALO
BK14!
11
BK14!
6
JS Revised for underground utilities 11-25-14 2
Notes Concerning Existing
Underground Electrical
Where in conflict, the contractor shall
adjust the existing underground
electrical wires to accomodate the root
ball in the aproximate locations shown.
Any divergence from the locations shall
be brought to the attention of the City
for approval prior to the installation of
any materials.
The relocation of any electrical shall be
included in the base bid as a seperate
item, (see bid form).
2
EJBEJB
EJB
EJB
EJB
EMH
EJB
EMH
EJB
EJB
EJBEJB
ICV
ICV
FH WM
SMH
SMH
TMH
GSV
G
S
V
26+00
27+00
28+0
0
29+0
0
30+00
31+00 32+00
North!
Scale, 1"= 20'
ROW Line
LIGHT
LIGHT EXISTING
LIGHT
LIGHT
Ma
t
c
h
l
i
n
e
E
Ma
t
c
h
l
i
n
e
F
CL
CL
CL
R/W
R/W
R/W
R/W
174t
h
A
v
e
n
u
e
174th Avenue
<E><E>
<E><E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
SAN
SAN
SAN
SAN
SAN
SAN
<E>
<E>
<E>
<E>
<E>
<E>
<E><E><E><E>
WS
WS
WS
WS
WS
BESAN
BE BE BE
BE
BE
BE
IRR
BE
BESAN
SAN
SAN
SAN
SAN
BG
VAULT
BG
BG
SA
N
B
G
B
G
BE
BE
BE
BE
BE
BE
BE
SAN
SAN
SAN
BE BE BE BE BE BE BE
SAN SAN SAN SAN SAN
BGBGBG
BG
BG
BG
BG
BG
BG
BG
BG
BG
BG
BG
BG
BCTV
BG BG BG
BT
BT
VAULT
BT BT BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT BT BT BT BT
WL
IRR
$USER$
ROAD NO.COUNTY
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
FINANCIAL PROJECT ID
SHEET
NO.j a m e s s a n t i a g o
landscape architecture and design
612 NE 14th Ave. Unit A, Fort Lauderdale, Fl. 33304
Tel. 305-791-3156
Email, Jsantiagolainc@Gmail.com
!
174th Street Roadway Improvements!
The City of Sunny Isles Beach, Fl.
Date: 8-25-14 Drawn By: JS
JS O'Leary Comments11-11-14 1
Landscape Plan
SHEET L-3
069
178
179
180
129
130
131
132
133134135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150151152153154
C L
2
IV3
105AF1
75
FM3
150
CN3
109
BK14
3
AF1
75 PHD14
6
FM3
150
CN3
109
AF1
75
JS Revised for underground utilities 11-25-14 2
Notes Concerning Existing
Underground Electrical
Where in conflict, the contractor shall
adjust the existing underground
electrical wires to accomodate the root
ball in the aproximate locations shown.
Any divergence from the locations shall
be brought to the attention of the City
for approval prior to the installation of
any materials.
The relocation of any electrical shall be
included in the base bid as a seperate
item, (see bid form).
2
P
UR
EJB
EJB
EJB
EJBEJB
EJBEJB
EJB
EMH
EJB
EJBEJB
EJB
EJB
EJB
EJB
EMH
EMH
EJB
FH
ICV
ICVWM
FH
WM
SMH
SMH
37+15.44
33+00
34+00
35+00
36+00 37+00
A1
A
North!
Scale, 1"= 20'
ROW Line
ROW Line
LIGHT
LIGHTLIGHT
LIGHT
M
a
t
c
h
l
i
n
e
F
CL
CL
CL
ROW Line
ROW Line
ROW Line
ROW Line
174th Avenue
CL
<E><E><E><E><E><E><E><E><E><E><E><E><E><E>
<E><E><E><E><E>
BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT
WL WL WL WL WL WL WL WL WL WL WL WL WL WL
WL WL
BE BE BE BE BE BE BE BE BE BE BE BE BE BE
SAN SAN
SANSAN
SAN
IRR
SAN SAN SAN SAN SAN SAN SAN
BGBGBGBGBG
BGBGBGBGBGBGBGBGBGBGBGBG
SD
SD
SD
WS
WS
WS
WS
WS
WS
WS
SA
N
Date: 8-25-14 Drawn By: JS
ROAD NO.COUNTY
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
FINANCIAL PROJECT ID
SHEET
NO.j a m e s s a n t i a g o
landscape architecture and design
612 NE 14th Ave. Unit A, Fort Lauderdale, Fl. 33304
Tel. 305-791-3156
Email, Jsantiagolainc@Gmail.com
!
174th Street Roadway Improvements!
The City of Sunny Isles Beach, Fl.JS O'qLeary Comments11-11-14 1
Landscape Plan
SHEET L-4
181
182
125126127
128
COMPACTED SUBGRADE
JS Revised for underground utilities 11-25-14 2
Date: 8-25-14 Drawn By: JS
(IF CONTAINERIZED REMOVE ENTIRE CONTAINER)
AROUND BATTENS.
(2) WRAPPED STEEL GALV. BANDS
(5) LAYERS OF BURLAP
(4) 2"X4" PRESSURE TREATED WOOD BRACES
(DO NOT PUNCTURE TRUNK.)
TOENAIL 2X4 BRACES TO BATTENS.
(5) 2"X4"X16" BATTENS
PLUMB & SET PALMS TRUE TO GRADE.
DO NOT TIE ROYAL PALMS.
ON SABALS & WASHINGTON PALMS.
NOT TRIM ENDS, LEAVE FRONDS TIED
TO PROTECT GROWING TIP. DO
TIE FRONDS DURING TRANSPORTING
NOTE:
6"
MIN. 1" LAYER MULCH OVER ROOT BALL. MULCH SHALL!
BE KEPT 6" FROM TRUNK.
REMOVE BURLAP AT TOP 1/3 OF PLANT BALL.
6" TEMPORARY WATERING BASIN
FINISHED GRADE
FERTILIZER TABLETS
2"X4"X24" PRESSURE TREATED STAKES,
ANCHOR 3" MIN. BELOW GRADE.
COMPACTED BACKFILL MIX
BACKFILL MIXTURE!
PLANTING HOLE SHALL BE DUG A MIN.!
OF 2X THE SIZE OF THE ROOTBALL AND !
4" DEEPER
PALM PLANTING DETAIL A
NOT TO SCALE
NOTE: TREE SHALL BE PLANTED
AT A DEPTH SUCH THAT 10% OF
THE ROOTBALL IS ABOVE GRADE.
NOT TO SCALE
SINGLE TRUNK GUYING AND PLANTING DETAIL C
FINISH GRADE
ROOT BALL
TREE
(2-3" CAL. SINGLE-TRUNK)
WATER BASIN
BLACK NYLON STRAPPING
THREE PER TREE MIN.
REDWOOD DEADMAN 2"x4"x24"
BURIED 2 FEET IN GROUND OR
GALVANIZED STEEL SPIKES
30" LONG 3/4" PVC
3" MULCH
TOP SOIL BACKFILL(MIN. OF 3 GUYS AT EACH TREE)
IN HEAVY CLAY SOILS OR WHERE THERE
IS A HARD PAN, AUGER AN 8" HOLE 6'
DEEP OR THROUGH THE HARD PAN.
PLACE ROOTBALL ON MOUND OF
TAMPED FIRM TOPSOIL
PLANT PIT SHALL BE 2.5 X AS
FERTILIZER TABLETS
WIDE AS ROOT BALL AND A
MINIMUM OF 4" DEEPER
6'
-
0
"
8"
+
2'
-
0
"
4"MI
N
.
6" CLEAR RADUIS TO TRUNK BASE TYP.
NOTE: TREE SHALL BE PLANTED AT A DEPTH
SUCH THAT 10% OF THE ROOTBALL IS ABOVE
GRADE AND THE ROOT-FLARE AND TOP OF THE
FIRST ORDER ROOT(S) ARE FULLY VISIBLE.
PER PLAN.
O.C. SPACING AS
BACKFILL MIXTURE
EDGE OF ROOT MASS WITH PREPARED
EXISTING SUBSOIL
REMOVE ENTIRE CONTAINER BEFORE PLANTING
BACKFILL BETWEEN PLANTS 6" BEYOND
6" PLANTING SOIL-(PER SPECS)
FINISHED GRADE
MIN. 3" LAYER MULCH IN ENTIRE BED.
GROUNDCOVER/ANNUALS PLANTING DETAIL D
NOT TO SCALE
FINISHED GRADE
(IF CONTAINERIZED REMOVE ENTIRE CONTAINER)
EXISTING SUBSOIL
BACKFILL MIXTURE
FERTILIZER TABLETS
4" TEMPORARY WATERING BASIN
REMOVE BURLAP AT TOP 1/3 OF PLANT BALL.
MIN. 3" LAYER MULCH IN ENTIRE BED.
SHRUB PLANTING DETAIL B
NOT TO SCALE
TOP OF ROOTBALL SHALL BE 10%!
ABOVE FINISHED GRADE.
+
+
+
+
+
++
+
+++++SHALL BE PLANTED WITH TRIANGULAR
SPACING
ALL LINEAR SHRUBS AND HEDGE ROWS
PLANTING SPACE DETAIL E
NOT TO SCALE
Tree Protection Detail
Linear Application of "DeepRoot Tree Root Barriers" at Time
root barrier so that top of barrier is 2" (5cm)
1. Prepare base and subgrade
INSTALLATION SEQUENCE:
TREE ROOTS.
FLUSH WITH EDGE OF CURB. BARRIER RIBS FACE TOWARD
BARRIER INSTALLED IN A TRENCH IN SUBGRADE WHICH IS
TREE ROOT BARRIER INSET INTO CONCRETE.
TYPICAL SECTION OF CURB AND GUTTER WITH DEEPROOT
2. Trench to appropriate depth for installation of
THEN COMPACTED. BARRIER IS SET SO THAT TOP EDGE
of Installing Concrete Sidewalks and Curbs
WILL BE 2" (5CM) BELOW FINISH GRADE OF CURB, AND SET
below finish grade of top of curb.
face toward tree roots.
3. Place root barrier in trench, vertical ribs must
4. Backfill and compact to requirements.
5. Place form material against barrier (It may be
nailed from the outside of the form)
(It may be nailed from the outside
5. Place form material against barrier
4. Backfill and compact to requirements.
3. Place root barrier in trench, vertical
finish grade of top of sidewalk (or
2. Trench to appropriate depth for
1. Prepare base and subgrade
ribs must face toward tree roots.
INSTALLATION SEQUENCE:
FACE TOWARD TREE ROOTS.
COMPACTED BASE (or halfway between base
SO THAT TOP EDGE WILL BE 2" (5CM) ABOVE
BARRIER INSTALLED IN A TRENCH IN SUBGRADE
WITH DEEPROOT TREE ROOT BARRIER INSET INTO
TYPICAL SECTION OF CURB, GUTTER AND SIDEWALK
CONCRETE
WHICH IS THEN COMPACTED. BARRIER IS SET
and finish grade of SW). BARRIER RIBS
installation of root barrier so that
top of barrier is 2" (5cm) below
halfway between top of compacted base
and finish grade of SW)
of the form)
Curb and Gutter
Typical DeepRoot UB 24-2. Optional use of UB 18-2.
Minimum 6 panels or 12 linear feet (3.66m).
IMPORTANT NOTE: Tree location must align
Sidewalk
with "as-built" center of barrier.
DeepRoot UB 24-2,UB 18-2 or LB 12-2
5/8" (16mm)
grade of curb(5cm) below finishTop of root barrier 2"
"A"
Typical DeepRoot UB 24-2,optional use of UB 18-2
Subgrade compaction Compacted crushed base.
"A"
optional use of UB 18-2Typical DeepRoot UB 24-2,
Top of root barrier 2" (5cm) below
Concrete
Subgrade compaction
Compacted crushed base
finish grade of curb
Concrete
Base
Subgrade
GNOT TO SCALE
TREE PROTECTION/TEMPORARY BARRIER DETAIL
NOT TO SCALE
F
BEING PREPARED FOR SOD INSTALLATION.
PAVING & GRADING IS COMPLETE. FENCE
TO BE REMOVED AT TIME SITE IS
NOTE: ERECT FENCE PRIOR TO BEGINNING
DEMOLITION. LEAVE INPLACE UNTIL ALL
EXISTING GRADE
(3) 2X4 WOOD FENCE RAILS
EVENLY SPACED ON POSTS
AS NOTED W/ ORANGE MESH
FABRIC ATTACHED
Tree canopy
dripline
18"
18"
12"
2X4 WOOD POSTS AT ALL FOUR
CORNERS WITH INTERMEDIATE POSTS
AS REQUIRED. SINK POSTS 18" DEEP
IN GROUND
4'
P L A N T I N G N O T E S:
1. ALL SIZES SHOWN FOR PLANT MATERIAL ON PLAN ARE TO BE
CONSIDERED AS MINIMUMS. ALL PLANT MATERIAL MUST MEET
OR EXCEED THESE MINIMUM REQUIREMENTS FOR BOTH HEIGHT
AND SPREAD. ANY OTHER REQUIREMENTS FOR SPECIFIC SHAPE
OR EFFECT AS NOTED ON THE PLAN WILL ALSO BE REQUIRED FOR
FINAL ACCEPTANCE.
2. ALL PLANT MATERIAL FURNISHED BY THE LANDSCAPE
CONTRACTOR UNLESS OTHERWISE SPECIFIED SHALL BE FLORIDA NO.1
OR BETTER, AND SHALL BE INSTALLED AS SPECIFIED IN GRADES AND
STANDARDS FOR NURSERY PLANTS, PART I & II, STATE PLANT
BOARD OF FLORIDA. LATEST EDITION
3. IN ADDITION TO THESE REQUIREMENTS ALL LOCAL LANDSCAPE CODES
AND REQUIREMENTS SHALL BE MET IN ORDER TO SATISFY THE
REVIEW AND APPROVAL OF THE GOVERNING MUNICIPALITY.
4. ALL LANDSCAPING SCHEDULED TO OCCUR IN VEHICULAR USE AREAS
SHALL BE PROTECTED FROM VEHICULAR ENCROACHMENT BY
CURBING OR OTHER DURABLE BARRIERS.
5. ALL PLANTING HOLES SHALL BE A MINIMUM OF 2 1/2 TIMES THE
DIAMETER OF THE PLANT BALL. ALL PLANTING HOLES SHALL BE
EXCAVATED TO REMOVE ALL OBJECTIONABLE MATERIALS, SUCH AS
ASPHALT, SUB-BASE, CONCRETE, ROCK, CAUSTIC MATERIALS
WITH AN EXCESSIVE SOIL Ph, OR SIMILAR MATERIALS NOT SUITED
FOR LANDSCAPE PLANTING.
6. ALL PLANT MATERIALS SHALL BE PLANTED IN 50/50 PLANTING SOIL THAT
IS DELIVERED TO THE SITE IN A CLEAN, LOOSE AND FRIABLE
CONDITION. ALL SOIL SHALL HAVE A WELL DRAINED
CHARACTERISTIC. SOIL MUST BE FREE OF ALL ROCKS, STICKS,
OBJECTIONABLE DEBRIS INCLUDING WEEDS AND WEED SEED.
7. ALL PLANT MATERIALS SHALL BE THOROUGHLY WATERED IN AT THE
TIME OF PLANTING. NO DRY PLANTING SHALL BE PERMITTED. ALL
PLANT MATERIALS SHALL BE PLANTED SUCH THAT THE TOP OF
THE PLANT BALL IS FLUSH WITH THE SURROUNDING GRADE.
8. ALL PLANT MATERIALS SHALL BE INSTALLED WITH FERTILIZER
WHICH SHALL BE STATE APPROVED AS A COMPLETE FERTILIZER
CONTAINING THE REQUIRED MINIMUM OF TRACE MINOR ELEMENTS
IN ADDITION TO N-P-K, OF WHICH 50% 0F THE NITROGEN SHALL
BE DERIVED FROM AN ORGANIC SOURCE.
9. ALL LANDSCAPE AREAS NOT COVERED BY SHRUBS OR GROUND
COVERED SHALL BE COVERED BY SOD AND ALL AREAS NOR
COVERED BY SOD SHALL BE COVERED WITH EUCALYPTUS MULCH,
TO A MINIMUM DEPTH OF THREE (3) INCHES OF COVER WHEN
SETTLED.
10 .SOD (AS NOTED), SOLID SOD , AND SHALL BE LAID
ON A SMOOTH PLANTING BASE WHICH HAS BEEN
GRADED TO MEET THE DRAINAGE CHARACTERISTICS OF THE SITE.
ALL SOD SHALL BE LAID WITH CLOSELY FITTED JOINTS, AND SHALL
BE IN A GREEN AND HEALTHY GROWING CONDITION AT PLANTING.
11.ALL LANDSCAPE AREA SHALL BE IRRIGATED BY A FULLY AUTOMATIC
SYSTEM ADJUSTED TO PROVIDE 150% COVERAGE OF ALL LANDSCAPE
AREAS. ALL HEADS SHALL BE ADJUSTED TO MIN. 50% OVERLAP.
INSTALLED WITH A MINI-CLIK RAIN SENSOR, (SEE IRRIGATION PLANS).
12. ANY SUBSTITUTIONS TO PLANT MATERIALS FOR AREAS AND ITEMS
ADDRESSED BY LOCAL CODES SHALL BE APPROVED BY THE
GOVERNING MUNICIPALITY PRIOR TO WORK PERFORMED.
13. ALL LANDSCAPE AREAS SHALL BE FINISH GRADED SUCH THAT THEY
ARE FLUSH AND LEVEL WITH SURROUNDING PAVED SURFACES AS
NOT TO IMPEDE THE FLOW OF DRAINAGE INTO LANDSCAPE AREAS
AND TO PREVENT THE BACKWASH OF MULCH AND DEBRIS INTO
PAVED AREAS.
14. ALL NEWLY LANDSCAPED AREAS SHALL BE EXCAVATED DOWN TO A
DEPTH OF 24” BELOW FINAL GRADE AND BACK FILLED WITH CLEAN
DEBRIS-FREE SOIL
15. PLANTING PLAN TAKES PRECEDENT OVER PLANT LIST.
16. TREE REMOVAL PERMITS ARE REQUIRED PRIOR TO ANY TREE REMOVAL,
TO BE OBTAINED FROM THE BUILDING DEPARTMENT. MITIGATION IS
REQUIRED UNDER THE TREE PRESERVATION SECTION OF THE APPLICABLE
LAND DEVELOPMENT CODE.
17. LANDSCAPE PERMITS ARE REQUIRED BEFORE ANY PLANTING OCCURS.
PERMITS ARE OBTAINED FROM THE BUILDING DEPARTMENT.
18. LANDSCAPE ORDINANCE SPECIFICATIONS ON IRRIGATION AND INSTALLATIONS
SUPERSEDE ANY NOTES ON THE PLAN.
19. IT IS REQUIRED THAT THE LANDSCAPE CONTRACTOR SCHEDULE AN ON-SITE
PRE-CONSTRUCTION MEETING WITH THE CITY LANDSCAPER.
20. WHERE REQUIRED BY CITY ORDINANCE THE COMPLETE INSTALLATION
SHALL BE CERTIFIED BY THE FIRM PROVIDING THE DESIGN, PER. THE
CONTRACTOR WILL PROVIDE 2 SETS OF SIGNED & SEALED AS BUILT PLANS
TO THE OWNER
21. ROOT PROTECTION BARRIER SHALL BE INSTALLED IN ALL SITUATIONS WHERE
TREES OR PALMS ARE PLANTED LESS THAN 10 FEET FROM ANY PAVEMENT OR
BUILDING. THE BARRIER IS TO BE LOCATED AT THE GREATEST LIMIT OF THE
AVAILABLE SPACE OR AGAINST THE EDGE OF PAVEMENT OR STRUCTURE.
ROAD NO.COUNTY
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
FINANCIAL PROJECT ID
SHEET
NO.
!
174th Street Roadway Improvements!
The City of Sunny Isles Beach, Fl.
j a m e s s a n t i a g o
landscape architecture and design
612 NE 14th Ave. Unit A, Fort Lauderdale, Fl. 33304
Tel. 305-791-3156
Email, Jsantiagolainc@Gmail.com
JS O'Leary Comments11-11-14 1
Landscape Details SHEET L-5
9+68.88
174th Avenue
CL
CL
M
a
t
c
h
l
i
n
e
A
R/W
R/W
2
2
SMH
10+00
LIGHT
IT'S THE LAW IN FLORIDA
1-800-432-4770
CALL SUNSHINE
48 HOURS BEFORE YOU DIG
Any discrepensies concerning the materials or conditions of the
site that shall inhibit the installation as drawn shall be brought
to the attention of the owners representatives. Issues found
prior to bid will become a condition of the bid after the award of
the contract.!
!
After the award of the contract, any discrepancies in the plans
or additional materials and costs because of pre-existing
conditions at the site shall not be a reason for any additional
charges to the owners.!
!
These bid conditions are not to be considered all inclusive.
There may be additional conditions included in other
documents of the construction agreement. It is the contractor's
responsability to make himself and his subcontractors aware of
any other such conditions.!
!
Bid Notes
The quantities on the plant list are for the convenience
of the contractor only and not to be considered as the
final quantitiy for bid and installation. The callouts and
entities drawn on the plans take precedence over the
plant list.!
!
The contractor shall be responsable for his own takeoffs
of the plantings as drawn.!
!
The contractor shall be expected to visit the site prior to
bid. The contractor shall have an understanding of the
on site conditions to prepare his bid. Conditions existing
prior to bid will become a condition of the bid after the
bid is accepted by the client.!
!
!
!
1.
2.
3.
4.
5.
6.
SCHEDULE OF IRRIGATION HEADS
Rain Bird 1806-SAM-PRS Series
Turf Spray 6" popup with pressure regulator.
Rain Bird 1806-SAM-PRS 8 Series MPR
Turf Spray 6" popup with pressure regulator.
Rain Bird 1806-SAM-PRS 10 Series MPR
Turf Spray 6" popup with pressure regulator.
Rain Bird 1806-SAM-PRS 12 Series MPR
Turf Spray 6" popup with pressure regulator.
Rain Bird 1806-SAM-PRS 15 Series MPR
Turf Spray 6" popup with pressure regulator.
Rain Bird 1806-SAM-PRS 5 Series MPR
Stream Bubbler
Rain Bird PGA-PRS-D- Globe
1", 1-1/2", 2" Electric Remote Control Valve, Globe. With
Pressure Regulator Module.
Nibco T-113-K
Class 125 bronze gate shut off valve with cross handle,
same size as mainline pipe diameter at valve location. Size
Range - 1/4" - 3"
Hunter Solar-Sync
Solar, rain freeze sensor with outdoor interface, connects
to Hunter PCC, Pro-C, and I-Core Controllers, install as
per manufacturers instructions.
Includes 10 year lithium battery and rubber module
cover, and gutter mount bracket. Wired.
Hunter IC-600-pl Dual 48M, DUAL-1 decoders and DUAL-S
2-wire decoder controller with 48 station capacity, plastic
pedestal, ACC-PED.
Irrigation Lateral Line: PVC Class 160 SDR 26
PVC Class 315 for 1/2" pipe, PVC Class 200 for 3/4" pipe,
PVC Class 160 SDR 26 for 1" and above.
Irrigation Mainline: 2 1/2" PVC Class 200 SDR 2
PVC Class 200 irrigation pipe.
Pipe Sleeve: HDPE PE4710 DR 11 (202psi)
Typical pipe sleeve for irrigation pipe. See chart.
Existing 2" CITY WATER METER to be retained by the
contractor at the time of demolition and then when the site is
ready supplied and installed at the new location by the City.
All other existing meters are to be surrendered to the city at the
time of demolition and removal.
SS
#"
##
Valve Number
Valve Size
Valve Flow
Valve Callout
SEE SHEET IR-2 FOR THE LOCATION OF THE CLOCK
SEE SHEET L-4 FOR REPEAT OF
EQUIPMENT SHCEDULES AND SPECIFICATIONS
C
SYMBOL MANUFACTURER/MODEL/DESCRIPTION
NOTE: NO COMPONENTS OF THE IRRIGATION SYSTEM
SHALL BE INSTALLED OUTSIDE OF THE PROPERTY
LIMITS. ALL IRRIGATION LINES SHALL RUN IN SLEEVES
INDICATED. LINE LOCATIONS MAY BE SHOWN
OTHERWISE ON THIS PLAN FOR GRAPHIC CLARITY.
THE IRRIGATION IS TO BE OF A 2 WIRE COMPTUER CONTROLLED DESIGN. SEE SHEET IR-5
FOR DETAILS
IT IS THE RESPONSABILITY OF THE CONTRACTOR TO PROVIDE THE HEADS SHOWN AND
SIZE THE PIPE ACCORDING TO THE SPECIFICATIONS FOR PIPE SIZING AND SLEEVING
PROVIDED ON THIS SHEET.
THE LOCATION AND QUANTITY OF THE VALVES IS FOR THE CONVENIENCE OF THE
CONTRACTOR AND CAN BE ALTERED TO SUIT THE MEANS AND METHODS OF THE
ROADWAY CONSTRUCTION
THE PLANS ARE TO BE PRESENTED TO AND APPROVED BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION AND SHALL PROVIDE 100% COVERAGE WITH A 50% OVERLAP.
THE DESIGN SHALL PROVIDE SUFFICIENT PRESSURE AND FLOW TO SATIFY THE
MANUFATURERS SPECIFICATIONS FOR THE EQUIPMENT SPECIFIED.
WHERE AN EXISTING SYSTEM IS DEMOLISHED THE CONTRACTOR SHALL SUPPLY
TEMPORARY WATER TO ALL LANDSCAPE NOT EFFECTED BY DEMOLITION FOR THE
PERIOD OF CONSTRUCTION AND UNTIL THE SYSTEM IS IN PLACE AND OPERATIONAL.
WHERE POSSIBLE THE ZONES SHOWN ARE TO BE RESPECTED IN THE DESIGN
SEE CIVIL ELECTRICAL SHEETS FOR ELECTRICAL COORDINATION AND CONTINUATION
OF INSTALLATION SPECIFICATIONS.
SYSTEM DESCRIPTION
2
1
3
4
PIPE SIZING SCHEDULE 40
0-7 GPM = 3/4"
8-12 = 1"
13-22 = 1 1/4"
23-30 = 1 1/2"
31-50 = 2"
51-70 = 2 1/2"
71-110 = 3"
M
3" IRRIGATION MAIN LINE
3" IRRIGATION
M
A
I
N
L
I
N
E
PIPE SLEEVING SCHEDULE
PIPE SIZE SLEEVE SIZE
1"2"
1 1/4"2"
1 1/2"3"
2"
2 1/2"+6"
4"
Attach to Zone 2
Note that as part othis project,
all irrigation in the public right
of way will be demolished.
PERIMITER HEADS SHALL BE ON RISERS
SET AT 12" ABOVE FINISHED GRADE
BEFORE POP IS INSTALLED.
THE CENTRAL BUBBLERS ARE TO BE INTALLED
ON THE RISER WITHOUT POPUP BODY AT 12"
ABOVE FINISHED GRADE.
JS Revised for underground utilities
and meter location
11-25-14 2 ROAD NO.COUNTY
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
FINANCIAL PROJECT ID
SHEET
NO.j a m e s s a n t i a g o
landscape architecture and design
612 NE 14th Ave. Unit A, Fort Lauderdale, Fl. 33304
Tel. 305-791-3156
Email, Jsantiagolainc@Gmail.com
!
174th Street Roadway Improvements!
The City of Sunny Isles Beach, Fl.!JS O'Leary Comments11-11-14 1
Irrigation Plan
SHEET IR-1
9+68.88
B B
EJB
EJB
EMH
WM
WM
ICV
FH
ICV
SMH
SMH
11+00
12+00
13+00
EMH
EJB
EJB
EJB
EMH
EJB
WM
ICV
FH
FH
WMWM
ICV
SMH
SMH
14+00
15+00
16+00
17+00
18+00
North!
Scale, 1"= 20'
ROW Line
ROW Line
ROW Line
ROW Line
EXISTING
LIGHT
LIGHT
LIGHT
LIGHT
LIGHT
10+00
M
a
t
c
h
l
i
n
e
A
M
a
t
c
h
l
i
n
e
B
M
a
t
c
h
l
i
n
e
B
M
a
t
c
h
l
i
n
e
C
FH
FH
CL
CL
CL
CL
174th Avenue
174th Avenue
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
LIGHT
B
G
WL
SN
S
SN
S
B
G
WL
R
C
T
V
BE BE BE BE BE BE
BE BE BE BE BE BE BE
BE
SAN
SNS
SAN
SL SL
SL SL
SL
SL SL SL SL SL SL SL
SL SL
SL SL
SL
SL
SL
SL SL SL SL
SL
SL
SL SL
SAN
SL SL SL
SAN SAN SAN
BE
BE
BE BE BE
BE
BE
BE
BE
BE
BE BE BE BE BE BE
BE
SLSLSL
SAN
SAN SAN SAN SAN SAN SAN
BT
WS
WS
SD
WS
WS
WS
BCTV
BTW
BCTV BCTV
BCTV
BCTV
BCTV BCTV BCTV BCTV
BCTV
BCTV
BCTV
BCTV
BCTV BCTV
BE
BE
BG
BG
BT BT BT BT BT BT BT BT BT BT BT BT BT BT
BT BT
WL
WL
SA
N
BE
BE
BG BG
BG
BG
BG
BG
BG
BG
BG
BG
BG
BG BG
BG BG BG BG BG
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT BT BT BT BT
WLWLWLWLWLWLWLWL
WL
WLWL
WL
WL
WL
WL
WL
WLWL
WLWL
WLWLWLWLWLWLWLWLWLWLWLWLWLWLWLWLWLWL
174th Avenue
174th Avenue
CL
2
2
IT'S THE LAW IN FLORIDA
1-800-432-4770
CALL SUNSHINE
48 HOURS BEFORE YOU DIG
C
SS
6
7
M
3" IRRIGATION MAIN LINE
3" IRIGATION MAIN LINE
PERIMITER HEADS SHALL BE ON RISERS
SET AT 12" ABOVE FINISHED GRADE
BEFORE POP IS INSTALLED.
THE CENTRAL BUBBLERS ARE TO BE INTALLED
ON THE RISER WITHOUT POPUP BODY AT 12"
ABOVE FINISHED GRADE.
PERIMITER HEADS SHALL BE ON RISERS
SET AT 12" ABOVE FINISHED GRADE
BEFORE POP IS INSTALLED.
THE CENTRAL BUBBLERS ARE TO BE INTALLED
ON THE RISER WITHOUT POPUP BODY AT 12"
ABOVE FINISHED GRADE.
Exisitng point of connection to the
existing 12" water main to remain
and be reused
Relocate the
Existing 2"
irrigation water
meter # 60776603
back to this location
2
JS11-25-14 2 Revised for underground utilities
and meter location
ROAD NO.COUNTY
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
FINANCIAL PROJECT ID
SHEET
NO.
!
174th Street Roadway Improvements!
The City of Sunny Isles Beach, Fl.JS O'Leary Comments11-11-14 1
Irrigation Plan
SHEET IR-2
EJB
EMH
EJB
EMH
EJB
EJB
ICV
ICV
WM
SMH
SMH
GSV GSV
GSV
19+00 20+00
21+00
22+00
4
2
+
0
0
4
3
+
0
0
44
+
0
0
EMH
EJB
EJB
EJB
EJB
EJB
EJB EJB
EJB EJB
EJB
FH
ICV
ICV
FH
WM
SMH
TMH
G
S
V
GSV
22+00
23+00
24+00
25+00 26+00
North!
Scale, 1"= 20'
ROW Line
LIGHT
LIGHT
LIGHT
EXISTING
LIGHT
LIGHT
M
a
t
c
h
l
i
n
e
C
M
a
t
c
h
l
i
n
e
D
M
a
t
c
h
l
i
n
e
D
Ma
t
c
h
l
i
n
e
E
CL
CL
CL
CL
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
174th Avenue
No
r
t
h
B
a
y
R
o
a
d
No
r
t
h
B
a
y
R
o
a
d
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE
BEBE BE BE BE <E><E><E><E><E>
SL SL SL SL SL SL SL
SANSANSANSAN
SAN SAN
SAN SAN SAN SAN SAN SAN SAN
SL SL SL SL SL SL SL SL SL SL SL
WL
WL
WL
BG BG BG
BGBGBGBG
BG BG BG BG
BGBGBGBGBGBG
BCTV
BCTV
BCTV BCTVBCTVBCTVBCTVBCTV
WL WL WL WL WL WL
WL
WL
SL
SL
SL
SL
S
L
S
L
S
L
S
L
BT BT BT BT BT BT BT BT BT BT BT BT BT BT BTWLWLWL
WL WL WL WL WL WL
SL
WL
BT
SL SL SL SL SL SL SL
BT BT BT BT BT BT BT BT BT BT BT BT
BT
BT
WLWL
WL WLWLWLWLWLWLWLWLWLWLWLWLWLWL
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SAN
SAN SAN SAN SAN
BG BG BG BG BG BG BG BG BG BG BG BG BG BG BG BG BG BG
SA
N
BE
BE
GS
GS
GS
BE
SL
SL
SL
UN
K
UN
K
BT
BT
VAULT
WS
WS
SD
SD
SD
SD
BG
BG
BG
BE
BE
UN
K
UN
K
2
IT'S THE LAW IN FLORIDA
1-800-432-4770
CALL SUNSHINE
48 HOURS BEFORE YOU DIG
8
9
10
11
3" IRRIGATION MAIN LINE
3" IRRIGATIO
N
M
A
I
N
L
I
N
E
PERIMITER HEADS SHALL BE ON RISERS
SET AT 12" ABOVE FINISHED GRADE
BEFORE POP IS INSTALLED.
THE CENTRAL BUBBLERS ARE TO BE INTALLED
ON THE RISER WITHOUT POPUP BODY AT 12"
ABOVE FINISHED GRADE.
JS11-25-14 2 Revised for underground utilities
and meter location
$USER$
ROAD NO.COUNTY
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
FINANCIAL PROJECT ID
SHEET
NO.j a m e s s a n t i a g o
landscape architecture and design
612 NE 14th Ave. Unit A, Fort Lauderdale, Fl. 33304
Tel. 305-791-3156
Email, Jsantiagolainc@Gmail.com
!
174th Street Roadway Improvements!
The City of Sunny Isles Beach, Fl.
Date: 8-25-14 Drawn By: JS
JS O'Leary Comments11-11-14 1
Irrigation Plan
SHEET IR-3
EJBEJB
EJB
EJB
EJB
EMH
EJB
EMH
EJB
EJB
EJBEJB
ICV
ICV
FH WM
SMH
SMH
TMH
GSV
G
S
V
26+00
27+00
28+0
0
29+0
0
30+00
31+00 32+00
North!
Scale, 1"= 20'
ROW Line
LIGHT
LIGHT EXISTING
LIGHT
LIGHT
Ma
t
c
h
l
i
n
e
E
Ma
t
c
h
l
i
n
e
F
CL
CL
CL
R/W
R/W
R/W
R/W
174t
h
A
v
e
n
u
e
174th Avenue
<E><E>
<E><E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
<E>
SAN
SAN
SAN
SAN
SAN
SAN
<E>
<E>
<E>
<E>
<E>
<E>
<E><E><E><E>
WS
WS
WS
WS
WS
BESAN
BE BE BE
BE
BE
BE
IRR
BE
BESAN
SAN
SAN
SAN
SAN
BG
VAULT
BG
BG
SA
N
B
G
B
G
BE
BE
BE
BE
BE
BE
BE
SAN
SAN
SAN
BE BE BE BE BE BE BE
SAN SAN SAN SAN SAN
BGBGBG
BG
BG
BG
BG
BG
BG
BG
BG
BG
BG
BG
BG
BCTV
BG BG BG
BT
BT
VAULT
BT BT BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT BT BT BT BT
WL
IRR
2
IT'S THE LAW IN FLORIDA
1-800-432-4770
CALL SUNSHINE
48 HOURS BEFORE YOU DIG
THIS LEGEND IS REPEATED ON SHEET IR-001
END OF MAIN
Any discrepensies concerning the materials or conditions of the
site that shall inhibit the installation as drawn shall be brought
to the attention of the owners representatives. Issues found
prior to bid will become a condition of the bid after the award of
the contract.!
!
After the award of the contract, any discrepancies in the plans
or additional materials and costs because of pre-existing
conditions at the site shall not be a reason for any additional
charges to the owners.!
!
These bid conditions are not to be considered all inclusive.
There may be additional conditions included in other
documents of the construction agreement. It is the contractor's
responsability to make himself and his subcontractors aware of
any other such conditions.!
!
Bid Notes
The quantities on the plant list are for the convenience
of the contractor only and not to be considered as the
final quantitiy for bid and installation. The callouts and
entities drawn on the plans take precedence over the
plant list.!
!
The contractor shall be responsable for his own takeoffs
of the plantings as drawn.!
!
The contractor shall be expected to visit the site prior to
bid. The contractor shall have an understanding of the
on site conditions to prepare his bid. Conditions existing
prior to bid will become a condition of the bid after the
bid is accepted by the client.!
!
!
!
1.
2.
3.
4.
5.
6.
12
13
PIPE SIZING SCHEDULE 40
0-7 GPM = 3/4"
8-12 = 1"
13-22 = 1 1/4"
23-30 = 1 1/2"
31-50 = 2"
51-70 = 2 1/2"
71-110 = 3"
3" IRRIGATION MAIN LINE
PIPE SLEEVING SCHEDULE
PIPE SIZE SLEEVE SIZE
1"2"
1 1/4"2"
1 1/2"3"
2"
2 1/2"+6"
4"SS
C
SYMBOL MANUFACTURER/MODEL/DESCRIPTION
M
PERIMITER HEADS SHALL BE ON RISERS
SET AT 12" ABOVE FINISHED GRADE
BEFORE POP IS INSTALLED.
THE CENTRAL BUBBLERS ARE TO BE INTALLED
ON THE RISER WITHOUT POPUP BODY AT 12"
ABOVE FINISHED GRADE.
Rain Bird PGA-PRS-D- Globe
1", 1-1/2", 2" Electric Remote Control Valve, Globe. With
Pressure Regulator Module.
Nibco T-113-K
Class 125 bronze gate shut off valve with cross handle,
same size as mainline pipe diameter at valve location. Size
Range - 1/4" - 3"
Hunter Solar-Sync
Solar, rain freeze sensor with outdoor interface, connects
to Hunter PCC, Pro-C, and I-Core Controllers, install as
per manufacturers instructions.
Includes 10 year lithium battery and rubber module
cover, and gutter mount bracket. Wired.
Hunter IC-600-pl Dual 48M, DUAL-1 decoders and DUAL-S
2-wire decoder controller with 48 station capacity, plastic
pedestal, ACC-PED.
Irrigation Lateral Line: PVC Class 160 SDR 26
PVC Class 315 for 1/2" pipe, PVC Class 200 for 3/4" pipe,
PVC Class 160 SDR 26 for 1" and above.
Irrigation Mainline: 2 1/2" PVC Class 200 SDR 2
PVC Class 200 irrigation pipe.
Pipe Sleeve: HDPE PE4710 DR 11 (202psi)
Typical pipe sleeve for irrigation pipe. See chart.
Existing 2" CITY WATER METER to be retained by the
contractor at the time of demolition and then when the site is
ready supplied and installed at the new location by the City.
All other existing meters are to be surrendered to the city at the
time of demolition and removal.
JS11-25-14 2 Revised for underground utilities
and meter location
Date: 8-25-14 Drawn By: JS
ROAD NO.COUNTY
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
FINANCIAL PROJECT ID
SHEET
NO.j a m e s s a n t i a g o
landscape architecture and design
612 NE 14th Ave. Unit A, Fort Lauderdale, Fl. 33304
Tel. 305-791-3156
Email, Jsantiagolainc@Gmail.com
!
174th Street Roadway Improvements!
The City of Sunny Isles Beach, Fl.JS O'qLeary Comments11-11-14 1
Irrigation Plan
SHEET IR-4
P
UR
EJB
EJB
EJB
EJBEJB
EJBEJB
EJB
EMH
EJB
EJBEJB
EJB
EJB
EJB
EJB
EMH
EMH
EJB
FH
ICV
ICVWM
FH
WM
SMH
SMH
37+15.44
33+00
34+00
35+00
36+00 37+00
A1
A
North!
Scale, 1"= 20'
ROW Line
ROW Line
LIGHT
LIGHTLIGHT
LIGHT
M
a
t
c
h
l
i
n
e
F
CL
CL
CL
ROW Line
ROW Line
ROW Line
ROW Line
174th Avenue
CL
<E><E><E><E><E><E><E><E><E><E><E><E><E><E>
<E><E><E><E><E>
BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT
WL WL WL WL WL WL WL WL WL WL WL WL WL WL
WL WL
BE BE BE BE BE BE BE BE BE BE BE BE BE BE
SAN SAN
SANSAN
SAN
IRR
SAN SAN SAN SAN SAN SAN SAN
BGBGBGBGBG
BGBGBGBGBGBGBGBGBGBGBGBG
SD
SD
SD
WS
WS
WS
WS
WS
WS
WS
SA
N
FINISH GRADE
SUMP - 1 CU. FT.
REQUIRED
GRAVEL SUMP.
4"
NUT.
UNDISTURBED SOIL
4"
3/4" SCREENED GRAVEL
6" CLASS 160 PVC - LENGTH AS
CONCRETE THRUST BLOCK - REFER
TO TECHNICAL SPECIFICATIONS
PVC PRESSURE SUPPLY LINE
CAST IRON GATE VALVE
MECHANICAL OR GASKETED
JOINT W/ SQUARE OPERATING
10" ROUND VALVE BOX. BRAND
"GV" INTO VALVE BOX LID. REFER
TO TECHNICAL SPECIFICATIONS.
VALVE BOX TO REST ON
SCALE: N.T.S.
GATE VALVE 3" AND UP
SECTION
PLAN
SECTION
PLAN
SECTION
PLAN
SECTION
PLAN
SECTION
PLAN SPECIFICATIONS.
MANUFACTURER'S INSTALLATION
WIRING AT 10' INTERVALS
TAPE AND BUNDLE
ALL PLASTIC PIPING TO BE
SNAKED IN TRENCHES AS
SHOWN.
ALL MAIN SUPPLY LINES TO BE
INSTALLED IN ACCORDANCE WITH
CODE.
ALL 120 VOLT WIRING IN
CONDUIT TO BE INSTALLED
IN ACCORDANCE WITH LOCAL
120 VOLT IN CONDUITPLASTIC LATERAL WIRING IN CONDUIT
10'
WIRING
24
"
IN MAIN LINE TRENCH)
MAIN LINE
(WHERE NO WIRING IS
LATERALDETECTABLE TAPE
12
"
24
"
12
"
24"
AND WIRING
36
"
12
"
18
"
8"18"
MAIN SUPPLY
8"12"
MAIN SUPPLY, LATERAL
SCALE: N.T.S.SCALE: N.T.S.
TYPICAL TRENCHING DETAILS
ISOMETRIC
22" + POLY PIPE
LINE SIZE X 1/2" TEE
LATERAL LINE
1''X1'' STEEL
ANGLE 24'' DEPTH
SEE BELOW
1/2'' FEM ADAPTER
( 2 PLACES )
BARBED ELL
1/2'' SCH. 40 RISER
SEE ABOVE
INSTALL HEAD TO MATCH
12'' SPRAY OR ROTOR SPRINKLER
PVC SCH. 40 RISER-1/2''
SURROUNDING PLANT
MATERIAL. SEE PLANT
LIST SPECIFICATIONS.
TWO STAINLESS STEEL
HOSE CLAMPS
PAINTED BLACK
12'' MIN.
MULCH
SPRINKLER NOZZLE
SCALE: N.T.S.SCALE: N.T.S.
12" POP-UP ON RISER
CURB OR CONCRETE
SCH. 40 PVC SOLVENT WELD
PVC LATERAL PIPING
SxSxT FITTING
12" SCH. 80 PVC NIPPLE
X"
NOZZLE 2" ABOVE FINISH GRADE
BUBBLER HEAD-INSTALL TOP OF
SCALE: N.T.S.SCALE: N.T.S.
BUBBLER ON RISER DETAIL
OFFSET AS
REQUIRED
THRUST
BLOCK
SOIL (TYPICAL)
UNDISTURBED
BLOCK
CONC.
THRUST
H
MA
X
.
H/
2
CROSSCUT
EDGE OF
18"
MIN.
AREA
(Sq. Ft.)
FITTING
THRUST
PLAN
TYPICAL SECTION
THRUST BLOCKS ARE TO BE CONSTRUCTED WITH 3,000 PSI CONCRETE AT 48 HRS. STEEL REINFORCING RODS WILL BE REQ'D IF SURROUNDING SOIL HAS A BEARING VALUE OF LESS THAN 2,000 PSF. THRUST BLOCKS REQUIRED AT ALL FITTINGS AND DIRECTION CHANGES ON MAIN LINES. NOTE THRUST BLOCK LOCATIONS ON AS-BUILT DRAWINGS.
SCALE: N.T.S.SCALE: N.T.S.
TYPICAL THRUST BLOCK DETAIL
NOTE: Thrust block areas computed on basis of 2000 lbs.
per sq. ft. soil resistance bearing.
2.04
1.53
1501.40.5 0.251.0
1501.1.2.4.8
.52
1.52.5
90Ā
(Sq. Ft.)
BEND
PIPE
SIZE
(inches)
150.4.1
1501.1.2
.2.3
.4.8
DESIGN
(P.S.I.)
PRESSURE
TEE OR
(Sq. Ft.)
PLUG
/1
411 Ā
(Sq. Ft.)
BEND
1/222 Ā
(Sq. Ft.)
BEND
45Ā
(Sq. Ft.)
BEND
SCHEDULE FOR THRUST BLOCK AREAS
SCALE: N.T.S.SCALE: N.T.S.
SCHEDULE OF TYPICAL THRUST BLOCK AREAS
Rough blocking forms shall be used along sides of thrust blocks.
Install a plastic bearier (Visquine) between fittings and thrust block.
All wood blocking shall be pressure treated with preservative.
Thrust block bearing areas shall be poured against undisturbed material. Where trench wall has been disturbed, excavate all loose material and extend to undisturbed material.
Extend thrust block for full length of fittings. Put board in front of plug before pouring
concrete. Joints shall not be covered by thrust block.
Thrust blocks shall be used in combination, as required, to suit the specific fitting
arrangement.
Alternate designed restraining systems shall be provided where standard thrust blocking is not suitable.
1.
2.
3.
4.
5.
6.
7.
THRUST BLOCK NOTES
Number each zone valve box on underside of valve box cover with a black
waterproof marker for reference. Numbers shall match the zone numbers on
Number each zone valve control wire at the controller with a waterproof marker
Maintain the irrigation system until final acceptance of the work. Maintenance
shall include work, materials and replacements necessary to insure a complete
It will be the Owner's responsibility to maintain the system in working order
during the guarantee period, performing necessary minor maintenance, keeping
grass from obstructing the sprinkler heads and preventing vandalism and
employees or work.
CLEANING: The Contractor shall at all times keep the premises (grounds and
pavements) free from accumulations of waste material or rubbish caused by his
4.
2.
damage during the landscape maintenance operation.
properly operating system.
individual settings of control stations.
FINAL ADJUSTMENT: Balance and adjust the irrigation system components for
efficient, proper operation. This includes controller synchronization as well as
LABELS
MAINTENANCE
INSTRUCTIONS
B.
1.
1.
2.
A.
3.
G.
and tags. Numbers shall match the zone numbers on the drawings
the drawings.
grades.
MATERIALS: Materials and equipment shall be new and shall operate at the
PIPE: Comply with the following unless otherwise indicated: All PVC pipe shall be
160 PSI, Polyvinyl Chloride (PVC 1120) ASTM-D2241, Type 1, NSF approved.
CROSSINGS: Comply with the following: All crossings under paved areas for water
and conduit lines shall be Schedule 40 PVC, ASTM-D1785. All crossings located in F.D.O.T.
PIPE FITTINGS: Comply with the following: For PVC plastic pipe, ASTM-D2466
SPRINKLER HEADS: Sprinkler heads shall be of the type shown on the drawings.
Filter screens shall be included with all spray heads.
Risers and swing joints shall be as detailed on the drawings.
REMOTE CONTROL VALVES: Valves shall be as specified on the drawings. Use
VALVE BOXES: Valve boxes shall be Ametek VP-10 or approved equal. Install flush
CONTROL WIRING: All wiring to automatic circuit valves shall be UF-14 direct
burial wire of a different color than the black and white wires used on the 115 volt A.C.
PVC Flex connections: Shall be Ag-Products heavy walled flexible PVC pipe or
equal. Average length of each connection is referred to on the drawings. Special
flex cement shall be utilized for making these connections.
Risers for shrub heads shall be Schedule 40 PVC pipe
SECTION 2B - IRRIGATION SYSTEM
Site work (rough grading).
Landscaping (see landscape specifications).
Work included: This Section is part of the entire set of contract documents and shall be
coordinated with the applicable provisions of the other parts.
The extent of landscape irrigation system is shown on the drawings. Completion of
this work shall mean full and exact compliance and conformity with the provisions
expressed or implied in the drawings, schedules and specifications. Irrigation
installer is not relieved of his responsibility to provide proper irrigation coverage by
providing full and exact compliance with the drawings and specifications. If field
conditions or other unforeseen factors warrant that design modifications are
necessary, irrigation installer shall notify Landscape Architect immediately.
The work under this section includes furnishing and installing materials to construct
an automatic irrigation system and maintaining that system until final completion
and acceptance, but not less than 30 days from date of installation, and any other
work as called for on the plans and in these specifications.
Electrical service to pump and controller shall be provided by others under separate
contract with Owner, in compliance with N.E.C. requirements.
Landscape irrigation system installation shall only be performed by a firm that is
regularly engaged full time in the installation of underground landscape irrigation
systems. (Crews shall be controlled and directed by a foreman who is thoroughly
familiar with the type of materials being installed and the manufacturer's
recommended methods of installation, and is well versed in reading blueprints.)
QUALITY ASSURANCE3.
A.
B.
C.
RELATED WORK2.
A.
C.
PART 1 - GENERAL
DESCRIPTION OF WORK
B.
1.
A.
C.
Teflon tape only on threaded connections.
with finish grade as indicated on drawing.
7.
8.
6.
manufacturer's published capacities.
socket fittings with ASTM-A2564 solvent cement.
RISERS AND SWING JOINTS:
A.
B.
5.
3.
4.
PART 2 - PRODUCTS
1.
2.
GENERAL: The Contractor shall be responsible for full and complete coverage of all
irrigated areas and shall make any necessary adjustments at no additional cost to the
power. Wiring from the controller to the valves shall be installed in same trench as the
mainline where possible. All splices shall be made with Rain Bird snap-tite connectors,
or approved equal. All wire shall be furnished in minimum 2,500' reels and spliced
CONTROLLER: Controller shall be as specified on the drawings.
WATER SOURCE: EXISTING WATER MAIN TO BE UTILIZED. SEE PLANS FOR
POINT OF CONNECTION
Perform all excavations as required for the installation of the work included
under this section, including shoring of earth banks to prevent cave-ins.
Restore all surfaces, existing underground installations, etc., damaged or cut as
a result of the excavations to their original conditions.
Trenches shall be made wide enough to allow a minimum of 2 inches between
parallel pipe lines. The minimum vertical clearance between lines crossing at
angles greater than 45 degrees is 1 inch. Trenches for pipe lines shall be made
of sufficient depth to provide the minimum cover from finish grade as follows:
16 in. minimum cover over main lines.
16 in. minimum cover over control wires
SPRINKLER HEADS: Large gear-driven rotary type shall be installed so that the
top is slightly above finish grade. If finish grade has not been established, set the
top four inches above grade and lower when finish grade has been achieved.
Sprinklers on risers shall be set at elevations so that there is no interruption of the
stream from the sprinkler nozzle caused by plant material during the first growing
season (1 year from date of installation). Heads along curbs and walks shall be set
flush to within 1/8 inch and two to four inches away from curb or walk. Adjust
heads having an adjustment stem, for the proper radius and throw for the area
CONTROL WIRES: Shall be installed in a neat and orderly fashion underneath the
main and lateral pipes, if possible. Ten-inch loops shall be provided at each valve
where control wires are connected. All wires passing under existing or future
Where possible, install pipe adjacent to curbs or paving to minimize interference
with plants and their roots. Coordinate with landscape installer regarding
Keep trenches free of obstruction and debris that could tend to damage pipe and
control wires. Remove excess soil from the site and leave grade as it was prior
to sprinkler system installation. Piping shall be routed around shrubs, trees and
Install plastic pipe as recommended by the manufacturer and provide for
expansion and contraction. Cut plastic pipe square. Remove burrs at cut ends
prior to installation so that a smooth unobstructed flow will be obtained.
Install remote control valves at locations no closer than 12 inches to walk edges,
buildings, and walls. Plastic pipe and fittings shall be solvent welded using
solvents and methods as recommended by manufacturer of the pipe, except
where screwed connections are required. Pipe and fittings shall be thoroughly
cleaned of dirt, dust and moisture before applying solvent with a nonsynthetic
bristle brush. Care should be taken not to use an excess amount of solvent,
thereby causing a burr or obstruction to form on the inside of the pipe. Allow
the joints to set at least 24 hours before applying pressure on PVC pipe. Do not
use PVC cement which has begun to gel. Do not attempt to make pipe
connections during inclement weather conditions.
least twelve inches beyond edges of paving or construction.
TESTING: All main lines shall be hydrostatically tested in the presence of the
Owner's representative at a pressure of 40 psi for a period of time not less than four
(4) hours, should any leaks be found, they shall be repaired. The line shall then be
retested until satisfactory. All lateral lines downstream from the remote control
valves shall be visually inspected for leaks, should any be found, they shall be
repaired. The line shall then be retested until satisfactory.
BACKFILL AND COMPACTING: After system is approved or sections thereof,
backfill excavations and trenches with clean soil, free of rubbish. Backfill for all
trenches, regardless of the type of pipe covered shall be compacted to a minimum
90% of its maximum density (AASHTO T-180). Dress off all areas to finish
paving, construction, etc., shall be encased in plastic pipe as specified, extending at
a.
to facilitate a trouble-free installation at the site.
site by the Contractor.
timing device (controller).
Contractor's construction.
graphic representation of sprinkler zones.
to be covered and any special conditions involved.
The contractor is responsible for his own bathroom and drinking facilities.
Prior to excavation, verify in the field the location and depth of all new and existing
utilities and take proper precautions not to damage or disturb such utilities.
Repair to original condition, new and existing utilities and other work damaged by
In the case of damages to the irrigation system caused by others, the cost of
repairing the work shall be paid by the party causing said damage.
After completion of piping installation, Contractor shall furnish the Owner's
representative a reproducible "as built" drawing showing all sprinkler heads,
valves, and pipelines to reasonable scale, and provide a minimum of two
dimensions taken from fixed obvious objects to each automatic control valve, and
quick coupling valve. The Contractor shall also furnish a drawing showing a
Instruction sheets and parts lists covering all operating equipment shall be bound
into a folder and furnished to the Owner's representative or Landscape Architect in
two (2) copies. The Owner reserves the right to withhold 10% of the contract
amount until the "as built" drawings and instructions and parts lists folders are
Guarantee workmanship for a period of one year after date of final acceptance. In
addition, see to the fulfillment of all manufacturer's warranties.
The Contractor shall provide the Owner with a written guarantee stating everything
Should any objectionable materials such as old concrete, bricks or other debris
be encountered during the installation operation, they shall be removed from the
Crossings under paved areas as indicated, shall be installed by the Contractor.
Crossings shall be installed prior to compaction of subgrade.
Irrigation installation shall not begin until rough grades have been established.
Contractor shall be responsible for coordinating his work with all other parties
involved with the job, and shall coordinate the supply of electrical power to the
Upon substantial completion of work, the Contractor shall request a
walk-through by the Landscape Architect to formulate a "punch list".
Contractor shall complete "punch list" items as quickly as possible, and
request another walk-through to verify completion. Upon successful
completion of the "punch list" items, the work will be accepted by the Owner.
received.
GUARANTEE
A.
B.
8.
SUBMITTALS
B.
7.
A.
B.
C.
A.
UTILITIES6
C.
3.
4.
2.
1.
SCHEDULING
2.
B.
grades.
F.
E.
D.
involved.
C.
b.
PIPE LINE ASSEMBLY
proposed plant material locations.
other permanent obstacles.
2.
1.
B.
4.
3.
Design modifications may be made only as necessary to meet field conditions and
only as acceptable to Landscape Architect. Piping shown on plans is
diagrammatically routed for clarity - route to avoid conflict with specimen plants
and adjust as necessary to accommodate landscape construction.
Contractor shall be responsible for verification at the site of all conditions and
dimensions shown on the plans prior to commencement of work.
CODES AND STANDARDS: Work shall comply with the American Society for
Testing and Materials (ASTM) and National Electrical Code.
REQUIREMENTS OF REGULATORY AGENCIES: Work shall comply with
codes, ordinances, and regulations of all governing authorities
WATER TESTING: Contractor shall test the salt content (chlorides and t.d.s) of
PRODUCT HANDLING: The Contractor shall protect all materials and work against
injury from any cause and shall provide and maintain all necessary safeguards for the
protection of the public. He shall be liable for any damage or injury to person or
property which may occur as a result of his negligence in the prosecution of the work.
Inspection: Contractor must examine the areas and conditions under which
landscape irrigation system is to be installed and notify the Landscape Architect
in writing of conditions detrimental to the proper and timely completion of the
work. Do not proceed with the work until unsatisfactory conditions have been
corrected. Contractor shall fully acquaint himself with related planting,
electrical, paving, site and utilities work to preclude any misunderstanding and
1.
JOB CONDITIONS
EXISTING CONDITIONS
5.
A.
the irrigation well.
F.
4.
E.
C.
D.
B.
EXCAVATING AND TRENCHING:
2.
1.
A.
PART 3 - EXECUTION
Owner.
INSTALLATION2.
1.
only at valve or tee locations.
9.
10.
Rights of Ways shall be installed at a depth of no less than the ten times the diameter
of the pipe size
5 EARTH GROUND (Per manufacturer's recommendations)
4
5
3
2
1
PRIMARY AC WIRING (MUST RUN IN SEPARATE CONDUIT)4
CONDUIT SWEEP(S) FOR SOLENOID WIRES3
CONCRETE SLAB (2"/50MM ABOVE GRADE)2
1 ACC99D-PP pedestal
SCALE: N.T.S.
ICORE D CONTROLLER INSTALLATION DETAIL
THE CONTRACTOR IS TO SUPPLY AND
INSTALL THE CONTROLLER HOUSING ON A
SLAB, 36"X36"X4" ACCORDING TO
MANUFACTURERS SUGGESTED
ATTACHMENT.
DRILL 1/2" DRAIN HOLE IN
ALUMNINUM POLE
CONCRETE FOOTER 2000 PSI,
MINIMUM, TOP SHAPED TO DRAIN.
1" ELECTRICAL CONDUIT FASTENED
SECURELY TO FOOTER.
HOLES DRILLED IN POLE FOR WIRE
ACCESS HERE AND AT BASE FOR
CONDUIT
RAIN SWITCH/SENSOR AS SPECIFIED,
MOUNTED PER MANUFACTURER'S
RECOMMENDATION.
STANDARD ALUMINUM
FENCE POLE.12
'
36
"
12
"
WIRES TO
CONTROLLER
18"
RAIN SENSOR WIRES RUN
WITHIN POLE.
IRRIGATION DETAIL - RAINSWITCH
MOUNTING
NOT TO SCALE
5. PVC. MALE ADAPTER
CORRECT INSTALLATION DIMENSIONS)
(INSTALL LENGTH AS NECESSARY FOR
(NOT SHOWN)
PVC SCHEDULE 80 CLOSE NIPPLE
8" DEEP.
PVC SCHEDULE 80 NIPPLE.
PVC SCHEDULE 80 TOE NIPPLE.
HARCO D.I.P. SERVICE TEE
WIRE CONNECTOR AND 30" EXPANSION LOOP
KING BROS. BTU TRUE UNION SERIES PVC
CHATAHOOCHEE RIVER WASHED STONE
VALVES ON SAME FIELD SATELLITE.
COMMON WIRE TO OTHER TO OTHER
COMMON BRICK (4 MINIMUM REQUIRED).
PVC PIPE TO SPRINKLERS. ANGLE PIPE TO
IN 1" DIA. COIL.
PVC SCH. 40 SxS 45 DEG. ELL.
CONTROL/COMMON WIRES FROM
FIELD SATELLITE./ OR DECODERS. USE AWG 12
WIRE.
BALL VALVE WITH FEMALE THREADED ENDS.
SPECIFIED DEPTH WITH 45Ā ELLS.
PVC SCHEDULE 80 FPT X FPT 90 DEG. ELL
18.
REQUIRED FOR DRIP VALVES.
WITH FLOWS LESS THAN 20 GPM.
PRV SHALL BE SAME SIZE AS
ELECTRIC CONTROL VALVE. NOT
OF ALL ELECTRIC CONTROL VALVES
ELEVATION
INSTALL WILKINS # 500 PRESSURE
REGULATING VALVE DOWN STREAM
14
NOTE:
ELEVATION
10
15
18
17
12
15
*
10
16.
15.
17.
13.
14.
12.
15
2"
16 9
6"
7 8
6
11.
10.
9.
8.
7.
6.
LEGEND
CHRISTY'S I.D.TAG - NUMBERED TO
RECTANGULAR VALVE BOX W/
PURPLE if required
ELECTRIC CONTROL VALVE.
FINISH GRADE.
MATCH DRAWINGS.
BOLT DOWN COVER.
1311 1 2
1.
3 4
4.
3.
2.
SCALE: N.T.S.
CONTROL VALVE DETAIL
LOCATE IC 100 DECODER
IN VALVE BOX WITH VALVE.
ALL WIRE CONNECTIONS TO BE
TWISTED AT CONNECTIONS OF WIRE AND
INSTALLED IN WATERPROOF CONNECTORS
SUPPLIED WITH DECODERS
SHEET IR-5
XX
IRRIGATION DETAIL
WITH ISOLATION VALVE
SCALE: 1.5" = 1'-0"
R
ICV 1" GLOBE VALVE
FINISH GRADE
3/4" MINUS WASHED GRAVEL
BRICK SUPPORTS (4)
MAIN LINE PIPE & FITTINGS
STANDARD VALVE BOX
WATERPROOF CONNECTORS (2)
18-24" COILED WIRE
GATE VALVE LINE SIZED
PVC SLIP UNIONS
WITH FILTER SENTRY
SCH 80 T.O.E. NIPPLE(5)
REMOTE CONTROL VALVE MODEL
ICV-101G ACCU-SYNC-XX
NOTE; ACCU-SYNC-XX IS AVAILABLE IN
PRESSURE REGULATION SETTINGS OF 20, 30,
40, 50 AND 70 PSI.
JS11-25-14 2 Revised for underground utilities
and meter location
Date: 8-25-14 Drawn By: JS
ROAD NO.COUNTY
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
FINANCIAL PROJECT ID
SHEET
NO.
!
174th Street Roadway Improvements!
The City of Sunny Isles Beach, Fl.
j a m e s s a n t i a g o
landscape architecture and design
612 NE 14th Ave. Unit A, Fort Lauderdale, Fl. 33304
Tel. 305-791-3156
Email, Jsantiagolainc@Gmail.com
JS O'Leary Comments11-11-14 1