HomeMy WebLinkAboutReso 2017-2757• RESOLUTION NO. 2017- Z1s1 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE ORDER NOS. 1 AND 2 TO AGREEMENT #3 WITH EBSARY FOUNDATION CO. FOR THE THIRD PHASE OF THE CONSTRUCTION OF THE NORTH BAY ROAD PEDESTRIAN EMERGENCY BRIDGE, IN AN AMOUNT NOT TO EXCEED SIX : HUNDRED SIXTEEN THOUSAND THREE HUNDRED SEVENTY- . - NINE DOLLARS AND FORTY-EIGHT CENTS ($616,379.48), ATTACHED HERETO, IN SUBSTANTIALLY THE SAME FORM, AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO SIGN SAID CHANGE ORDERS; AUTHORIZING THE CITY MANAGER AND CITY ATTORNEY TO DO ALL THINGS NECESSARY TO EFFECTUATE THE TERMS OF THIS P. RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on February 16, 2017, via Resolution No. 2017-2663, the City Commission approved Agreement #1 with Ebsary Foundation Co. for the North Bay Road Pedestrian Emergency Bridge for the North Bay Road Pedestrian Emergency Bridge, consisting of mobilization, MOT, demolition, drilled shafts, cast in place concrete, precast concrete structure, administration, contingency, and associated fees in an amount not to exceed $3,407,032.45; and WHEREAS, on February 16, 2017, via Resolution No. 2017-2664, the City Commission approved Agreement #2 with Ebsary Foundation Co. for the North Bay Road Pedestrian Emergency Bridge for the North Bay Road Pedestrian Emergency Bridge, consisting of bridge approaches, MSE walls, road bed support, administration, contingency and associated fees in an • amount not to exceed $1,796,673.45; and WHEREAS, on February 16, 2017, via Resolution No. 2017-2665, the City Commission approved Agreement #3 with Ebsary Foundation Co. for the North Bay Road Pedestrian Emergency Bridge for the North Bay Road Pedestrian Emergency Bridge, consisting of finish grade, road bed, asphalt, pavers, decorative fencing, hardscape, permanent safety elements, electrical system, administration, contingency and associated fees in a total amount not to exceed $823,010.95; and WHEREAS, Ebsary Foundation Co. has submitted Change Order No. 1 to include bridge decorative colored surface material, landscape planters, wooden benches, and associated rigid pavement slabs required to provide a pedestrian friendly atmosphere; and WHEREAS, Ebsary Foundation Co. has submitted Change Order No. 2 to include the addition of storm water drainage for the bridge and improved storm water drainage and pavement for the roadway abutting the emergency/pedestrian bridge; and 51 WHEREAS, staff has determined that additional services beyond the original scope of E . work is needed to remain on schedule and complete the project; and Page I of 3 R2017 Ebsary Agmt No 3 COs 1 and 2 5:t WHEREAS,the City wishes to approve Change Order Nos. 1 and 2 to Agreement#3 with Ebsary Foundation Co. for the North Bay Road Pedestrian Emergency Bridge for the North Bay Road Pedestrian Emergency Bridge, in a total amount not to exceed Six Hundred Sixteen Thousand Three Hundred Seventy-Nine Dollars and Forty-Eight Cents ($616,379.48), attached hereto, in • substantially the same form, as Exhibit "A", bringing the total amount of Agreement #3 not to exceed One Million Four Hundred Thirty Nine Thousand Three Hundred Ninety Dollars and Forty Cents ($1,439,390.40). • NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: 4.+ i`f: Section 1. Approving Change Order Nos. 1 and 2 to Agreement #3 with Ebsary Foundation Co. The City Commission hereby approves Change Order Nos. 1 and 2 to Agreement #3 with Ebsary Foundation Co. for the North Bay Road Pedestrian Emergency Bridge for the North Bay Road Pedestrian Emergency Bridge,in a total amount not to exceed Six Hundred Sixteen Thousand Three Hundred Seventy-Nine Dollars and Forty-Eight Cents ($616,379.48), attached hereto, in substantially the same form, as Exhibit "A", bringing the total amount of Agreement #3 not to exceed One Million Four Hundred Thirty Nine Thousand Three Hundred Ninety Dollars and Forty Cents ($1,439,390.40). Section 2. Authorization of City Manager. The City Manager is hereby authorized to sign • Change Order Nos. 1 and 2, attached hereto, in substantially the same form, as Exhibit "A". Section 3. Authorization of City Manager and City Attorney. The City Manager and City Attorney are authorized to do all things necessary to effectuate the terms of this Resolution. Section 4. Effective Date. This Resolution shall become effective upon adoption. -`` PASSED and ADOPTED this 16th day of No ember 1017. • Geol.! - H. Scholl, Mayor AT . ST 41 I • Maur io Bet. ur,CMC, City Clerk ` s t. Page 2 of 3 82017 Ebsary Agmt No 3 COs 1 and 2 . APPROVED • : TO FORM AND LEGICIENCY: ,D! /4/4Ottinot, City Attorney 3r Aft: Moved by: ICC 146,-- Ctvi pl-Ns ebMVAt Seconded by: tOv'i Gii-T"a Vote: Mayor Scholl " (Yes) (No) Vice Mayor Goldman (Yes) (No) Commissioner Aelion I(Yes) (No) Commissioner Gatto (Yes) (No) Commissioner Svechin V (Yes) (No) • Page 3 of 3 R2017 Ebsary Agmt No 3 COs 1 and 2 r.: S,31.4 NYis4 ,r.- *F s _ . PF CHANGE;, 4CITY OF SUNNY ISLES BEACHORDERtiC• FLO s Y OF $UN CHANGE ORDER NUMBER: 1 DATE: October 31,2017 i • PROJECT: RFP NUMBER: 14-09-01 North Bay Road Pedestrian Emergency Bridge RESOLUTION NUMBER: r.. ORIGINAL DOLLAR CONTRACT AMOUNT: $ 823,010.95 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: $ 0 DOLLAR AMOUNT OF THIS CHANGE ORDER: $ 423,690.20 CREDIT/DIRECT PURCHASES: $ 0 NEW DOLLAR CONTRACT AMOUNT: $ 1,246,701.15 ORIGINAL CONTRACT COMPLETION DATE February 15,2018 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 0 - Zero AMOUNT OF DAYS PER THIS CHANGE ORDER: 0 - Zero NEW CONTRACT COMPLETION DATE: February 15,2018 DESCRIPTION OF SCOPE OR WORK CHANGES: • Add decorative Paveway colored surface material, landscape planters, wooden benches, and rigid concrete pavement slabs as depicted on CGA documents, Dated June 14, 2017 Sheets SP -201 thru IR - 103 NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT Include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the s matters set forth herein, including all direct and Indirect costs for equipment, manpower, materials, overhead, profit and delay relating to the issues set forth in this document. CONTRACTOR CITY ATTORNEY: PROJECT MANAGER: CITY MANAGER: S Ok S �NwwY`l id . , j ? , CITY OF CHANGE t * V F SUNNY ISLES BEACH - ; P ORDER y' *FLOC\ S'i• C,T)'OF SUN PNO CHANGE ORDER NUMBER: 2 DATE: October 31,2017 PROJECT: RFP NUMBER: 14-09-01 North Bay Road Pedestrian Emergency Bridge RESOLUTION NUMBER: I ORIGINAL DOLLAR CONTRACT AMOUNT: $ 823,010.95 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: S 423,690.20 DOLLAR AMOUNT OF THIS CHANGE ORDER: S 192,689.28 CREDIT/DIRECT PURCHASES: S 0 NEW DOLLAR CONTRACT AMOUNT: S 1,439,390.43 ORIGINAL CONTRACT COMPLETION DATE February 15,2018 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 0 - Zero AMOUNT OF DAYS PER THIS CHANGE ORDER: 0 - Zero NEW CONTRACT COMPLETION DATE: February 15,2018 DESCRIPTION OF SCOPE OR WORK CHANGES: Add storm water drainage system to bridge approaches, storm water drainage system and ' asphalt paving to Salem House Condominium as depicted on CGA documents, Dated June 14, 2017 Sheets SP -201 thru IR - 103 NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to In this document constitute a full and complete settlement of the matters set forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit and delay relating to the Issues set forth in this document. CONTRACTOR CITY ATTORNEY: PROJECT MANAGER: CITY MANAGER: ,z. Y - SJp�NY lS�� City of Sunny Isles Beach 18070 Collins Avenue 77, 11.s Sunny Isles Beach, Florida 33160 Ec.9,.•FLoR`O ;4 (305)947-0606 City Hall '+ Tr of s�K'otC (305)949-3113 Fax MEMORANDUM { • TO: The Honorable Mayor and City Y Commission FROM: Christopher J. Russo, City Manager DATE: 11/16/2017 Approving Change Order Nos. 1 and 2 with Ebsary RE: Foundation Company for the North Bay Road Emergency/Pedestrian Bridge RECOMMENDATION: This Resolution is presented for your consideration. REASONS: 1. The original bridge design and bid document did not include final aesthetic finishes including, bridge decorative colored surface material, landscape planters, wooden benches, and associated rigid pavement slabs required to provide a pedestrian friendly atmosphere. These items are included in Change Order No. 1 for the amount of $423,690.20 2. Additional design study of the bridge approaches by the project engineer resulted in the addition of, storm water drainage for the bridge and improved storm water drainage and pavement for the abutting Salem House Condominium (SHC) necessitated due to the addition of bridge approach roadways and temporary construction easements granted by SHC necessary to physically construct the bridge structure. These items are included in Change Order No. 2 for the amount of $192,689.28 ADDITIONAL INFORMATION: �t. Remaining items not contemplated in the design and bid documents, 39 #F that will need to be funded include, the improvements to the Salem House parking lot lighting, paving, new fencing and exit gate. These improvements where part of the agreement with Salem House by which they have provided us a temporary construction easement and their full cooperation in allowing us to stage for construction from within their property. The relocation of the FPL transformer, which is currently in the City bridge easement, may come to fruition on a tract of City-owned land abutting the Salem House property for which an access easement would be necessary. The westside of the North bridge landing ramp will require some concrete work in order to have a finished look to this exposed area. Substantial completion is expected by the end of this calendar year. FUNDING SOURCE: 300-5-5390-465000-83001 ATTACHMENTS: Description Resolution Change Order Nos. 1 and 2 ui Conceptual Design Item Number: 10.C. aF•S rr- ✓i t. 40