Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cummins Cederberg
Tab A: Title Page Request for Qualifications RFQ NO. 18-02-01 MARINE AND COASTAL PROFESSIONAL ENGINEERING CONSULTING SERVICES March 22, 2018 Prepared by: Cummins Cederberg, Inc. 7550 Red Road, #217 South Miami, Florida 33143 Tel. 305 741 6155 Fax: 305-974-1969 www.cumminscederberg.com Contact Person: Mr. Jannek Cederberg Tab B: Table of Contents Tab C Cover Letter and Excutive Summary ................................. Tab D Project Approach and Understanding ................................ Tab E Qualification Information and Assigned Personnel ............ Tab F Firm References and Similar Work Completed .................. Tab G Corporate Standing and Authorized Signatory .................. Tab H Forms and Attachments ..................................................... Cummins | Cederberg 7550 Red Road, Suite 217 ▪ South Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com Tab C: Cover Letter and Executive Summary Cummins | Cederberg 7550 Red Road, Suite 217 ▪ South Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com CUMMINS | CEDERBERG Coastal & Marine Engineering March 22, 2018 City of Sunny Isles Beach City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 Re: RFP NO. 18-02-01 MARINE AND COASTAL PROFESSIONAL ENGINEERING CONSULTING SERVICES Dear Sir/Madam: The firm of Cummins Cederberg, Inc. (Cummins Cederberg) is pleased to submit qualifications for engineering services as requested in the above referenced RFP, for your review and consideration. Cummins Cederberg is excited for the opportunity to present our firm with the ambition of developing a long-term relationship as a trusted advisor. We have reviewed and understand the scope of work to be performed, which is within our core services. As a dynamic and flexible organization, used to working on high profile paced projects, we are available to meet required schedules. If selected, Cummins Cederberg is willing to meet any location, budget, or task order. The firm does not hold any active contracts for similar services with public government entities, along the coast within 4 miles north, or 4 miles south of the City of Sunny Isles Beach (City). Cummins Cederberg Cummins Cederberg is a professional engineering firm uniquely specialized in the coastal and marine environment. All of the firm’s work occurs within this discipline from the main office in Miami-Dade County (County) and the support office in Palm Beach County. We are a certified Community Business Enterprise (CBE) as part of the Miami Dade County small business program. The firm includes a mixed staff of engineers and marine scientists ensuring we can lead and perform all aspects of coastal and marine projects. We are fully geared to conduct environmental and engineering field investigations requiring boats, GPS, hydrographic surveying equipment, SCUBA equipment, tide and current measurements. We also routinely use advanced engineering software, to conduct numerical modeling, including CAD, ARCGIS, RAM Structural Analyses, and MIKE21 coastal modeling. In fact, our firm has developed a unique wave and hydrodynamic RFP No. 18-02-01 – Cover Letter March 22, 2018 Page 2 Cummins | Cederberg 7550 Red Road, Suite 217 ▪ South Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com model simulating the tidal flow and wave conditions in Miami-Dade County including the entire shoreline of Sunny Isles Beach. The firm was founded by Mr. Jason Cummins, P.E. and Mr. Jannek Cederberg, P.E., and over the course of 8 years has successfully grown and been established as the leading engineering firm for complex coastal and marine engineering projects in Florida and the Caribbean. The company is repeatedly selected ahead of larger national engineering firms due to the unique and focused qualifications. The firm’s success is built on providing high quality work in a transparent manner in order to build long term relationships. The two founders have extensive experience in the coastal and marine environment in the U.S. and the Caribbean, from both private and public clients. They have been involved in more than 500 coastal and marine engineering projects in Florida and the Caribbean (some of the largest in the region) providing unmatched knowledge and experience. Both founders will remain highly involved in all work related to this contract. No other firm has more coastal and marine engineers on staff in Miami-Dade County (or Monroe and Broward Counties). This means work is done by engineers familiar with Miami-Dade County and directly accessible to the City. Our Miami office is not a branch office just serving as representation. Our local presence is further supported by our recent involvement in coastal and marine projects in Sunny Isles Beach, most as a result of recommendations from prior Sunny Isles Beach Clients. Recent and ongoing projects by the firm include: ▪ Winston Tower 500 Seawall ▪ Winston Tower 700 Seawall ▪ Coastal Towers Seawall and Marina ▪ Arlen House ▪ North Bay Road Pedestrian Bridge Coastal Design Conditions ▪ Trump Condominium FEMA Coastal Analysis Project Manager The primary contact for services associated with this RFQ would be Mr. Jannek Cederberg. Mr. Cederberg is intimately familiar with Sunny Isles Beach, having worked on coastal and marine projects in the area for 15 years, while also residing in Miami during this period. Mr. Cederberg has been involved in the environmental permitting and engineering of all of the firm’s projects in Sunny Isles Beach. In addition, Mr. Cederberg has unparalleled experience with the coastal dynamics in Miami Dade County. He has developed detailed analysis of sediment transport for the RFP No. 18-02-01 – Cover Letter March 22, 2018 Page 3 Cummins | Cederberg 7550 Red Road, Suite 217 ▪ South Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com entire County. The analyses include evaluating local and regional wave conditions, morphological trends, erosional hot spot assessments, shoreline response, and sediment budgets. Specifically, he was the lead engineer for the Sunny Isles Shoreline Stabilization Project conducted in 2008 for the City, which evaluated local coastal dynamics and provided recommendation for long term beach management. Mr. Cederberg earned his Master’s degree in coastal engineering from the Technical University of Denmark. Prior to relocating to Miami 15 years ago, Mr. Cederberg worked in Denmark for two large international consulting firms in their respective coastal and marine engineering departments, as well as DHI Water & Environment. Mr. Cederberg is a registered Professional Engineer in the State of Florida with experience in marine field investigations, environmental and regulatory permitting, hydrodynamics, wave dynamics, water quality, sediment transport, hurricanes, numerical modeling, sea level rise, coastal flooding, marinas, seawalls, bulkheads, ports and coastal structure design. Mr. Cederberg has completed environmental permit applications as well as engineering analyses and designs for a variety of shore protection, beach nourishment, cruise- ship, marina and waterfront projects throughout Florida, the Caribbean, and Central America. In addition, Mr. Cederberg was recently selected to participate in an expert group for PIANC (a more than 100-year old international coastal and marine engineering organization) related to marina design. Workload Cummins Cederberg is a dynamic firm with projects of varying size, allowing the firm to quickly adjust and allocate resources to Client needs such as the City of Sunny Isles Beach. The proposed Project Manager for this contract, Jannek Cederberg, currently has a 50% workload for the next projected months. Other staff members with applicable expertise are presently at a 75% workload with several projects near completion, which would allow smooth transition to upcoming projects envisioned by the City. We do not rely on any single person for specific services but overlap between staff relative to capabilities. Assignments for existing typical projects require a full time workload of less than 1-2 months, for any staff members. allowing us to plan and incorporate potential projects for the City. Cummins Cederberg is 100% committed to provide a high level of service and sustainable solutions for the City. Proposed Team We have assembled a great team of local businesses who have worked together before. The team consists of: ▪ Cummins Cederberg, Inc. ▪ Chen Moore & Associates, Inc. RFP No. 18-02-01 – Cover Letter March 22, 2018 Page 4 Cummins | Cederberg 7550 Red Road, Suite 217 ▪ South Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com ▪ Nutting Engineers, Inc. ▪ Biscayne Engineering, Inc. ▪ Chisholm Architects, Inc. Our team is ready to provide, and experienced in providing the services requested in the RFQ, as outlined in the below table: Services Cummins Cederberg Chen Moore & Associates Nutting Engineers Biscayne Engineer- ing Chisholm Architects A. Beach/ Marine/ Intracoastal Waterway Engineering Services X B. Environmental Engineering Services X X X X C. Geotechnical Services X D. Land Surveying Services X E. Architectural Services X F. Civil Engineering Services For Coastal Engineering X G. Marine Structural Engineering Services: X H. Coastal and Hydrographic Surveying Services: X X I. Project Construction Engineering Services and Post- Construction Services X X J. Other Preliminary Construction Phase Services: X X X X X K. Environmental Monitoring Services and Environmental Assessments X L. Additional Services X X X X X RFP No. 18-02-01 – Cover Letter March 22, 2018 Page 5 Cummins | Cederberg 7550 Red Road, Suite 217 ▪ South Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com Authorized Representations The following persons will be authorized to make representations for the firm: Jannek Cederberg, M. Sc., P.E., President, Jason Cummins, M. Sc., P.E., Vice President Both are located at our main office at: 7550 Red Road, #217 South Miami, Fl 33190 Phone: 305-741-6155 Based on our team’s unique experience, high quality service and local representation, we are confident that we are the best team for this important and exciting project for the County. We appreciate the opportunity to present our qualifications and we look forward to assisting the City. Should you have any questions or require additional information, please do not hesitate to contact me at 305 741 6155 or jcederberg@CumminsCederberg.com. Sincerely, CUMMINS CEDERBERG, INC. Jannek Cederberg, M.Sc., P.E. President Cummins | Cederberg 7550 Red Road, Suite 217 ▪ South Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com Tab D: Project Approach and Understanding Cummins | Cederberg 7550 Red Road, Suite 217 ▪ Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com CUMMINS | CEDERBERG Coastal & Marine Engineering Approach and Methodology Cummins Cederberg understands servicing the City of Sunny Isles Beach (City), means ultimately servicing the public including residents and many visitors. Cummins Cederberg has always promoted clear communication and practical solutions allowing our Clients to make informed decisions, which are functional and within budget requirements. In order to ensure a high quality and successful delivery of requested services for the City, Cummins Cederberg will assign our experienced President, Mr. Jannek Cederberg, P.E., as Project Manager for the service agreement. Cummins Cederberg is accustomed to working in Sunny Isles Beach and understands the uniqueness of the City, as well as the challenges arising from a low lying island with many residents and visitors. We have successfully worked through these challenges before in Sunny Isles Beach, as well as Miami-Dade County (County) in general, and are confident we can continue, while establishing a long term relationship as a trusted advisor. Most coastal and marine related projects include several phases of work through the duration of the project as illustrated in the below flow chart. The following is a brief description of the typical components required for a successful project, from initial conception through implementation. Included are examples from recent projects by our firm to illustrate relevant experience. The scope and extent required within each component will vary amongst projects. City of Sunny Isles Beach Approach and Methodology RFQ 18-02-01 Page 2 Cummins | Cederberg 7550 Red Road, Suite 217 ▪ Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com Understand Objectives and Goals Prior to initiating any projects, Cummins Cederberg will meet with the City to have a clear understanding of objectives and goals. A cardinal point of our values, is to provide services that can be applied directly by the City and with a clear action plan. Studies need to lead to a next clearly defined step and design needs to meet the requirements and budgets of the City. In addition, potential funding and grant opportunities should be explored early on as small modifications in project scope sometimes can open up funding and grant opportunities. Cummins Cederberg has experience in working with public entities relatives to obtaining grants and funding for beach and waterfront projects. Condition Inspections For projects involving existing shoreline stabilization (i.e. seawalls) or other waterfront structures, an engineering condition inspection is highly recommended in order to understand remaining service life and potential repair needs. Our team of SCUBA certified licensed engineers have significant experience performing above and below water inspections of timber, steel, concrete and rock structures. In addition, as a true coastal and marine engineering firm, our engineers understand coastal and marine processes (waves, currents, erosion, etc.), thus we are not only assessing the structural condition but also the underlying reasons for the deterioration. This allows for improved designs with longer service life. Recent projects include the Sunset Harbour Yacht Club in Miami Beach, where Cummins Cederberg conducted an engineering inspection of the existing concrete structures and seawall followed by engineering design, environmental permitting, and construction administration. At the One Miami Condominium along the Miami River, Cummins Cederberg recently conducted ultrasonic measurements of the bulkhead to determine remaining thickness of aged and highly corroded steel sheet pile. Field Investigations In order to obtain site specific data, field investigations are typically required, which can include bathymetric surveying, marine resource mapping and tide/current measurements. The field investigations normally occur in the beginning of the project, as it provides the foundation for subsequent analyses, permit applications, and ultimate design. Cummins Cederberg is flexible and understands quick mobilization can be required in order to capture field data at the appropriate time and move forward with dependent components. Cummins Cederberg has the necessary staff, equipment and post- processing tools to obtain accurate field data. As an example, Cummins Cederberg recently conducted bathymetric surveying, marine resource mapping, along with tidal and current measurements at Crandon Marina in Key Biscayne as part of a Sedimentation Study analyzing sand movement into the marina. The data was processed for use in ARCGIS City of Sunny Isles Beach Approach and Methodology RFQ 18-02-01 Page 3 Cummins | Cederberg 7550 Red Road, Suite 217 ▪ Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com and subsequent used for the numerical modeling of waves and currents, as well as the design of shoreline stabilization structures in order to ensure we developed a functional solution that would not cause impacts to marine resources. Permitting Waterfront projects in Florida, and specifically Sunny Isles Beach with portions located within the Biscayne Bay Aquatic Preserve, are heavily regulated by various environmental agencies, including Miami Dade County Division of Environmental Resources Management, Florida Department of Environmental Protection and the US Army Corps of Engineers. As a result of consistent projects in Florida’s marine environment, Cummins Cederberg is very familiar with the agencies, staff and procedures. Prior to submitting actual permit applications, we typically conduct pre-application meetings to better understand initial concerns and areas where we may need to collect additional data in, prior to submittal. A recent project is the reconstruction of the destroyed Costa Brava Marina, which was originally initiated more than 5 years earlier and passed through several consultants without significant progress in obtaining permits, including multiple denials. The agencies finally presented the Association with a 3-month deadline before closing all applications, which would result in loss of all permit fees paid and any work presented. As a first step, Cummins Cederberg immediately reviewed the complete project history and met personally with all stakeholders. Several meetings were conducted with the various environmental agencies to understand concerns and provide all required information before the 3-month deadline. Despite certain applications requiring a complete restart, the thorough documentation, meetings and communication were rewarded with approval of the project and permits before the 3-month deadline. Cummins Cederberg was subsequently engaged to provide construction administration. Coastal Engineering Analysis Design of waterfront projects requires an understanding of coastal processes such as wave, currents, sediment transport and storm surge. Cummins Cederberg has extensive experience analyzing coastal processes on both a local and regional scale in South Florida and the Caribbean. The first steps generally involve developing an understanding of the driving components such as waves, tidal flow or storm water under various conditions. Cummins Cederberg developed a detailed wave and hydrodynamic model of Miami-Dade County including Biscayne Bay, which allows for quick analysis of different areas. The model was developed utilizing the advance MIKE21 software and can be used to analyze beach erosion, sand movement, storm waves, storm surge and tidal flow among other items. Cummins Cederberg recently conducted a coastal engineering analysis for the northern end of Key Biscayne as well as multiple marina locations in Biscayne Bay, where wind generated storm waves and storm surge can be important. Cummins Cederberg also understands the importance of sea level rise City of Sunny Isles Beach Approach and Methodology RFQ 18-02-01 Page 4 Cummins | Cederberg 7550 Red Road, Suite 217 ▪ Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com in the planning of infrastructure, and recently assisted Miami-Dade County on this matter along with storm surge flooding relative to upgrades at the North District Wastewater Treatment Plant. Similar services were provided for the County’s waterfront park at Matheson Hammock, where we developed sea level rise flood mitigation concepts directly applicable to the County with a detailed implementation schedule. In addition, the principals of Cummins Cederberg were involved in several of the County beach management projects and are intimately familiar with the conditions along the oceanfront. Coastal and Marine Design Design of marine structures can be very different from upland structures due to the extreme environment and exposure to dynamic and powerful coastal processes, as well as constraints imposed by the environmental agencies. Therefore, the design is generally advanced in phases to ensure both engineering and regulatory requirements are satisfied in the most efficient manner. Cummins Cederberg prepared the seawall design for the Miami-Dade Blvd./Collins Canal bike path project in Miami Beach. This project was complicated not only by certain environmental requirements but also by several critical utility lines, which limited the proximity of pile driving activity and required creative design solutions. For beach projects it is important to establish a long term strategy due to the dynamic nature of beaches and potentially extensive permitting involved. Beach projects are often of significant cost but can erode quickly if not designed probably. Continuing placement of sand in eroded areas without a strategy, can in the long term be costly, if the underlying erosion problems are not addressed. Cummins Cederberg has been involved in various beach management projects in Miami-Dade County for 15 years. Most recently, Cummins Cederberg designed a small truck haul project for the County, but has also been involved in large scale nourishment projects such as Hillsboro Beach, Hollywood Beach and Hallandale Beach. City of Sunny Isles Beach Approach and Methodology RFQ 18-02-01 Page 5 Cummins | Cederberg 7550 Red Road, Suite 217 ▪ Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com Construction Administration Following the engineering design and permitting of projects, it is important to ensure that the project is constructed properly and follows engineering and permitting requirements. Cummins Cederberg is experienced with the construction administration process, starting with initial bidding and project award through pre-construction meetings, special inspections and site visits during construction until final completion. Experience has shown it is important the design engineers remain involved through this process, where comprehensive knowledge of the design conditions and underlying coastal processes correlates the varying construction techniques with potential impacts to future rate of deterioration and service life. As an example, Cummins Cederberg recently designed the seawall replacement and repairs as well as conducted subsequent construction administration for the Winston Tower 700 Condominium. Close oversight ensured proper concrete coverage, reinforcement treatment, and adequate removal of deteriorated material, which should provide a longer service life and lower maintenance cost for the Client. Environmental Monitoring Following completion of projects, documentation and monitoring of the performance can be a requirement from the regulatory agencies. Monitoring can include potential longe term impacts to marine resources, success of mitigation, or structural performance. Cummins Cederberg’s professional staff of engineers and biologists are qualified to provide these types of monitoring services and have been involved in long term environmental monitoring projects for large beach and dredging projects throughout Florida. Cummins | Cederberg 7550 Red Road, Suite 217 ▪ South Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com Tab E: Qualification Information and Assigned Personnel Cummins | Cederberg 7550 Red Road, Suite 217 ▪ Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com CUMMINS | CEDERBERG Coastal & Marine Engineering Summary of Team Qualifications The Cummins Cederberg team of engineers and marine scientists provides a unique comprehensive experience ranging from initial field investigations, such as: bathymetric surveying, structural underwater inspections, geotechnical analyses, environmental assessments, and current and wave measurements; through detailed analyses utilizing complex computer models; as well as the design of coastal structures, seawalls, marinas and ports. In addition, the Cummins Cederberg team provides experience in economic analyses, contract negotiations and construction administration. This unique combination of skills allows the firm to approach projects holistically with an exceptional understanding of overall construction cost and the interaction of individual components. The following Section provides resumes and project examples for our team. The project examples vary within the coastal and marine engineering discipline and are only a narrow representation of our experience within each type. The following page illustrates a summary table of the listed project experience by Cummins Cederberg relative to the requested services. As noted, the project experience just from Cummins Cederberg alone includes all of the services requested, with the exception of Architectural Services. The Cummins Cederberg staff involved in the projects listed, and the associated services, are still employed with us. To further complement and strengthen our team, we have assembled a strong team of subconsultants with a long history of providing quality service within Miami-Dade County: ▪ Chen Moore & Associates, Inc. ▪ Nutting Engineers, Inc. ▪ Biscayne Engineering, Inc ▪ Chisholm Architects, Inc. Resumes and project examples are provided for each of the subconsultant as well. Collectively, our team meets all of the qualifications required by the City of Sunny Isles Beach. City of Sunny Isles Beach Qualification Information RFQ 18-02-01 Page 2 Cummins | Cederberg 7550 Red Road, Suite 217 ▪ Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com Services Cummins Cederberg Projects (refer to project key below) 1 2 3 4 5 6 7 8 9 10 A. Beach/ Marine/ Intracoastal Waterway Engineering Services X X X X X X X X X X B. Environmental Engineering Services X X X X X X C. Geotechnical Services X X X X X X D. Land Surveying Services X X X X X X X E. Architectural Services F. Civil Engineering Services for Coastal Engineering X X X X X X X G. Marine Structural Engineering Services X X X X X X X H. Coastal and Hydrographic Surveying Services X X X X X X I. Project Construction Engineering Services and Post-Construction Services X X X X X X J. Other Preliminary Construction Phase Services X X X X X X X X K. Environmental Monitoring Services and Environmental Assessments X X X X X X X L. Additional Services X X X X X X 1. Coco Plum Beach Restoration 2. Miami-Dade Truck Haul 3. Crandon Park Marina Sedimentation 4. Bentley Bay Marina 5. Costa Brava Marina 6. Sunset Harbour Yacht Club Dock Repairs 7. Winston Tower 700 Seawall Replacement 8. Miami-Dade Blvd. Seawall Replacement 9. NDWWTP Storm Surge & Sea Level Rise Assessment 10. Matheson Hammock Sea Level Rise Flood Mitigation Study City of Sunny Isles Beach Qualification Information RFQ 18-02-01 Page 3 Cummins | Cederberg 7550 Red Road, Suite 217 ▪ Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com ▪ Cummins Cederberg Software ▪ MIKE21 Modeling software (Waves, hydrodynamic, hurricane, sediment transport, morphological, shoreline response, water quality) ▪ ARCGIS ▪ AutoCAD ▪ Civil 3D ▪ RAM Elements structural analysis ▪ All Pile structural pile analysis ▪ MathCad ▪ CWalSht – sheet pile analysis ▪ Level logger processing ▪ Cummins Cederberg Equipment ▪ Scuba Equipment – 5 people certified (engineers and marine biologists) ▪ Survey vessel ▪ Hydrographic Survey System (DGPS, Echosounder, Hypack) ▪ RTK GPS System ▪ Field Ruggedized Laptop ▪ Turbidity Meter ▪ Tide Gauge ▪ Underwater cameras ▪ Jet Probe System Jannek Cederberg, President Cummins Cederberg, Inc. (305) 741-6155 (305) 974-1969 jcederberg@cumminscederberg.com February 27, 2018 18-02-01 Marine and Coastal Professional Engineering Consulting Services 7550 Red Road, Suite 217 South Miami, FL 33143 Coastal & Marine Engineering Design and Permitting Geotechnical Engineer Surveyor 2051 NW 112th Ave, #126 Miami, FL 33172 Cummins Cederberg, Inc. x Chen Moore & Associates x Civil Engineer2103 Coral Way, Suite 401 Miami, FL 33145 Nutting Engineers of Florida, Inc. Biscayne Engineering Co., Inc.529 W Flagler Street Miami, FL 33130 x x x R.E. Chisholm Architects, Inc. Architect782 NW Avenue, Suite 650 Miami, FL 33126 Jannek Cederberg Senior Coastal & Marine Engineer 17 8 Cummins Cederberg M.Sc., Coastal Engineering PIANC Working Group 134 - "Design and Operational Guidelines for Super Yacht Facilities" Urban Land Institute South Florida Association of Environmental Professionals Professional Engineer, Florida Sunny Isles Coastal Analysis, Sunny Isles Assessment of local sediment transport characteristics and the potential for shoreline stabilization along Sunny Isles Beach. An evaluation of nearshore coastal processes and sediment transport characteristics in the Project vicinity was completed. Based on the assessment, a beach management plan was prepared for long-term beach planning. Regional Sediment Transport Study, Miami Shoreline and sediment transport studies performed on the coast of Miami-Dade County between Bakers Haulover Inlet and Government Cut. Numerical modeling conducted utilizing Danish Hydraulics Institute (DHI) MIKE21 and LITPACK software to simulate waves and nearshore coastal processes. Coastal engineering and environmental permit processing for 400k cubic yard beach fill project. Engineering design of beach fill template. Cross-shore sediment transport modeling. Geotechnical investigations and dredge plan for offshore borrow source. Contraction drawings and technical specifications. Hillsboro/Deerfield Beach Restoration, Broward County Crandon Park Marina Sedimentation Study, Key Biscayne Performed surveying, data collection, volumetric and equilibrium toe of fill analysis based on available historical beach profiles for four segments of beach. This information was utilized in designing the expansion of beach segments for maintenance nourishment. 1 eField investigations including bathymetric surveying, tide and current measurements, marine resourc survey, and sediment sampling. Tidal hydrodynamic modeling along with wave and sediment transport analysis conducted to determine source and magnitude of marina sedimentation problem. Alternatives assessment of potential coastal structures to inhibit sedimentation and need for periodic dredging. Miami Beach Emergency Truck Haul, Miami Beach 2008 N/A 2006 2009 2011 2013 2014 2014 N/A N/A E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 13. ROLE IN THIS CONTRACT12. NAME 15. FIRM NAME AND LOCATION (City and State) 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS (2) YEAR COMPLETED . (2) YEAR COMPLETED . (2) YEAR COMPLETED (2) YEAR COMPLETED . Jannek Cederberg Senior Coastal & Marine Engineer a. TOTAL 17 b. WITH CURRENT FIRM 8 Cummins Cederberg, Inc. South Miami, Florida M. Sc., Coastal Engineering Professional Engineer, Florida CONSTRUCTION (If applicable)PROFESSIONAL SERVICES (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Environmental permitting for reconstruction of a 30-slip marina in Biscayne Bay through local, state, and federal agencies (DERM, FDEP, and USACE). Engineering support through construction bid process, including bid evaluation and selection. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State) CONSTRUCTION (If applicable)PROFESSIONAL SERVICES CONSTRUCTION (If applicable)PROFESSIONAL SERVICES (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State) (1) TITLE AND LOCATION (City and State) (1) TITLE AND LOCATION (City and State) Costa Brava Marina, Miami Beach North District Wastewater Treatment Plant Assessment of coastal resiliency of important infrastructure components relative to flooding and sea level rise. Analyzed storm surge impacts from historical hurricane events as well assessed potential and magnitude of future impacts. Evaluated risk and probability of various events. Village of Key Biscayne Beach Nourishment, Key Biscayne Winston Tower 700, Sunny Isles Beach Construction of 240 feet of seawall and repair of 800 feet of seawall for shoreline stabilization at large condominium. Above/below water condition inspection, seawall replacement and repair design, permit application and processing (DERM/USACE/DEP), construction administration. Matheson Hammock Sea Level Rise Flood Mitigation Study, Miami ts ing ted (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Technical assessment of the conditions at Matheson Hammock Park relative to developing flood mitigation concep to limit impacts of sea level rise. compiling and processing of topographic LiDAR data to develop a detailed topographic map. Conditions inspection of all significant infrastructure components. Mapping of environmental resources. Typical and extreme tidal water levels was evaluated to understand peak tidal levels and exceedance probability. Published sea level rise projections were reviewed and adopted for the study. A flood inundation model was developed to analyze areas of flooding and timeframes relative to sea level rise. Flood mitigation concepts were developed and evaluated relative to urgency, construction costs, impacts to Park guests, permit feasibility and environmental impacts. An implementation schedule reaching the year 2100 was developed, outlin estimated infrastructure replacement dates, anticipated service life and required elevations based on the adop sea level rise projection. STANDARD FORM 330 (REV. 3/2013) PAGE 2 (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 N/A 2014 2014 2015 2003 2003 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Coastal engineering and environmental permitting for 120,000 cy beach fill and dune restoration project. Beach profile and hydrographic surveys conducted, along with sand source search, jet probes, vibracores, and sediment compatibility analysis. Coordination of dune vegetation planting and exotic removal plan. 2016 2016 N/A Jason R. Cummins 14 Cummins Cederberg, Inc. South Miami, Florida M.Sc., Coastal Engineering B.Sc., Civil Engineering Professional Engineer, Florida Member of Urban Land Institute, Member of Florida Association of Environmental Professionals Member of American Society of Civil Engineers North Bay Road Pedestrian Road Coastal Design Conditions Sunny Isles Beach, Miami-Dade County Hallandale / Hollywood Beach Nourishment Dade Boulevard Seawall Replacement, Miami Beach Marine engineering and construction drawings for 2,670 linear feet of shoreline stabilization associated with a linear park and bike pth. Structural design of steel sheet pile and reinforced concrete cap, including barrier wall connection, and utility crossover detail for FPL 69KV oil-filled transmission line. 8 Hillsboro / Deerfield Beach Restoration, Broward County 1 Coastal engineering and environmental permit processing for 400k cubic yard beach fill project. Engineering design of beach fill template. Cross-shore sediment transport modeling. Geotechnical investigations and dredge plan for offshore borrow source. Construction drawings and technical specifications. Senior Coastal & Marine Engineer Conducted pre-construction transect installation and biological monitoring including hardbottom mapping. Acropora cervicornis health tracking, and assessment of the nearshore reef using BEAMR, and conducted post construction hardbottom and epifaunal edge surveys. Monitoring reports were prepared per the project specific permit conditions. Bakers Haulover Inlet, Village of Bal Harbour Conducted a marine resource assessment of the existing jetty and proposed footprint of the reconfigured jetty as required by the environmental regulatory agencies to evaluate impacts related to the proposed Project and as required to secure permits for the proposed Project. A Field Observation Report was prepared documenting the extent, species, and density of existing marine resources. 2013 dHydraulic and scour analysis of the proposed Bridge relative to storm surge and current speeds, which will affect both scour an hydrodynamic forces. Tide and current measurements for input and calibration of a numerical hydrodynamic model. Statistical ratedanalysis to determine the extreme conditions for various return periods. A hydrodynamic numerical model was developed and calib oto simulate the flow under various conditions. The hydrodynamic flow various return periods and storm durations was evaluated t ddetermine the design current speed(s). Utilizing the design current speed(s) and water levels(s), a scour analysis was conducte and hydrdynamic loadings determined. 2010 N/A 2017 2010 2012 2010 2011 2014 2014 STANDARD FORM 330 (REV. 3/2013) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 13. ROLE IN THIS CONTRACT12. NAME 15. FIRM NAME AND LOCATION (City and State) 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS (2) YEAR COMPLETED . (2) YEAR COMPLETED . (2) YEAR COMPLETED (2) YEAR COMPLETED . (2) YEAR COMPLETED Jason R. Cummins Senior Coastal & Marine Engineer a. TOTAL 14 b. WITH CURRENT FIRM 8 Cummins Cederberg, Inc. South Miami, Florida M. Sc., Coastal Engineering B. Sc., Civil Engineering Professional Engineer, Florida Member of American Society of Civil Engineers (1) TITLE AND LOCATION (City and State) Miami Beach Emergency Truck Haul, Miami Beach CONSTRUCTION (If applicable)PROFESSIONAL SERVICES (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Performed surveying, data collection, volumetric and equilibrium toe of fill analysis based on available historical beach profiles and proposed fill volumes for four segments of beach. Designed fill template to maximize emergency truck haul nourishment based on observed eroded conditions. Survey stake-out of proposed fill template. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State) CONSTRUCTION (If applicable)PROFESSIONAL SERVICES (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Sunny Isles Coastal Analysis, Sunny Isles onAssessment of local sediment transport characteristics and the potential for shoreline stabilizati along Sunny Isles Beach. An evaluation of nearshore coastal processes and sediment transport characteristics in the project vicinity was completed. Based on the assessment, a beach management plan was prepared for long-term beach planning. Winston Tower 700, Sunny Isles Beach Construction of 240 feet of seawall and repair of 800 feet of seawall for shoreline stabilization gn,at large condominium. Above/below water condition inspection, seawall replacement and repair desi permit application and processing (DERM/USACE/DEP), construction administration. Costa Brava Marina, Miami Beach Sunset Harbour Yacht Club, Miami Beach 2015 2015 2008 N/A 2016 2016 2014 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Costa Brava Condominium Association. Environmental permitting for reconstruction of a 30-slip marina in Biscayne Bay through local, state, and federal agencies such as Miami-Dade County Regulatory, Economical Resources Department, Florida, Department of Environmental Protection and US Army Corps of Engineers. Engineering support through construction bid process, including bid evaluation, contractor selection and construction administration. 2015 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Repairs of concrete slabs, caps and piles for 125 slip yacht marinas. Environmental permit applications were prepared and processed with the Miami Dade County Regulatory and Economical Resources Department, Florida Department of Environmental Protection and US Army Corps of Engineers. Detailed repair drawings were prepared with specific criteria to minimize impacts to adjacent structures, including the removal and replacement of severely deteriorated deck slabs. Construction administration services were provided to review in accordance with construction documents and environmental permits. Coordinated project design and feasibility with several upland developers with riparian rights and supported pre-application negotiations with DEP to secure preliminary approval for a public boardwalk, connecting 10 different properties, with associated piers and slips, on state owned lands and within the Biscayne Bay Aquatic Preserve, which requires proprietary authorization a submerged lands lease. Coordinated a hydrographic survey and conducted a marine resource assessment of the proposed project area to determine whether significant marine resources such as seagrass E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (continued) (Complete one Section E for each key person.) 12. NAME Gina Francesca Chiello 13. ROLE IN THIS CONTRACT Project Manager 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and State) Cummins Cederberg, Inc. South Miami and Jupiter, Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Member of America Academy of Underwater Sciences Member of Florida Association of Environmental Professionals, Treasure Coast Chapter - Treasurer 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) c. Managed project and secured permit modifications from the USACE, DEP, and Broward County. Several permit conditions were modified to better suit the ongoing nature of the maintenance dredging and sand bypassing activities of the Hillsboro Inlet District. Provided as needed environmental and engineering consulting services with regards to permit compliance. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm d. (1) TITLE AND LOCATION (City and State) or corals were growing on the substrate to evaluate impacts related to the project. A Field Observation Report was prepared. (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) STANDARD FORM 330 (REV. 3/2013) PAGE 1 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Marine Biology Graduate Certificate in GIS, Environmental Science 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm 8 H illsboro Club Dune Restoration, Town of Hillsboro Beach 2016 CONSTRUCTION (If applicable) 2016 Managed Project and coordinated with DEP to secure a Coastal Construction Control Line (CCCL) permit to restore a dune adjacent to a multifamily condominium by placing approx. 1,300 cubic yards of sand on the beach. Conducted a dune vegetation survey and prepared an invasive exotic removal and native planting plan. Coordinated with DEP regarding appropriate sand color and placement and construction methodology. Currently under contract for construction administration services and permit close out. Hillsboro Inlet District Maintenance Dredging & Sand Bypassing, Broward County North Bay Village Public Boardwalk and Slips, North Bay Village 2015 2016 Bentley Bay Marina, Miami Beach PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018 Managed project that involved extensive project team and agency coordination. Conducted sovereign submerged lands research relative to historical mooring and the Butler Act Disclainer. secured permits from the USACE, DEP and DERM, as well as sovereign submerged lands authorization via a lease, for a 16-slip public docking facility, where seagrass is present, in the Biscayne Bay Aquatic Preserve. Parque Towers, Sunny Isles Beach 2013 2016 Managed project involving extensive project team and agency coordination. Coordinated with the USACE, SFWMD, and DERM to secure permits for a new bulkhead, which required Miami-Dade County BCC approval, in association with an upland development, where seagrass and mangroves are present. Conducted a UMAM assessment and designed a mangrove mitigation plan to offset impacts to mangroves that included a mangrove planter. Conducted a WATER assessment and coordinated with the FPL Everglades Mitigation Bank to purchase saltwater credits to offset the remaining mitigation requirements. 2016 N/A E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (continued) (Complete one Section E for each key person.) 12. NAME Gina Francesca Chiello 13. ROLE IN THIS CONTRACT Project Manager 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and State) Cummins Cederberg, Inc. South Miami and Jupiter, Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Member of America Academy of Underwater Sciences Member of Florida Association of Environmental Professionals, Treasure Coast Chapter - Treasurer 19. RELEVANT PROJECTS f. (2) YEAR COMPLETED g. (2) YEAR COMPLETED h. (2) YEAR COMPLETED i. (2) YEAR COMPLETED j. (2) YEAR COMPLETED STANDARD FORM 330 (REV. 3/2013) PAGE 2 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Marine Biology Graduate Certificate in GIS, Environmental Science 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 8 (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm CONSTRUCTION (If applicable) CONSTRUCTION (If applicable) CONSTRUCTION (If applicable) Bakers Haulover Inlet, Village of Bal Harbour 2014 2014 Conducted a marine resource assessment of the existing jetty and proposed footprint of the reconfigured jetty as required by the environmental regulatory agencies to evaluate impacts related to the proposed Project and as required to secure permits for the proposed Project. A Field Observation Report was prepared documenting the extent, species, and density of existing marine resources. Village of Key Biscayne Beach Re-nourishment, Village of Key Biscayne 2013 2015 Conducted resource assessments of the nearshore seagrass habitat using the Braun Blanquet method to monitor twenty-seven 35 meter long transects and conducted nearshore seagrass edge mapping, to evaluate any unanticipated project related impacts. Monitoring Reports were prepared, per the project specific permit requirements, documenting the findings of the nearshore seagrass edge surveys and Braun Blanquet monitoring data. Hollywood Beach Re-nourishment, Hollywood 2014 2015 Conducted pre-construction transect installation and biological monitoring including hardbottom mapping. Acropora cervicornis health tracking, and assessment of the nearshore reef using BEAMR, and conducted post construction hardbottom and epifaunal edge surveys. Monitoring reports were prepared per the project specific permit conditions. Miami Harbor Phase III, Miami 2014 2014 Conducted post-transplantation surveys of 38 Acropora cervicornis colonies. Work involved locating and tagging colonies, taking photographs, measuring colony size, identifying stress indicators, and assessing tissue color and partial mortality. Fragments were reattached via apoxy. Monitoring reports were prepared per the project specific permit conditions. 6800 Indian Creek Docking Facility, Miami Beach 2014 2016 Managed project and coordinated with the USACE, DEP, and DERM to secure permits and sovereign submerged lands authorization via a lease modification, to reconfigure a multifamily 16-slip docking facility with ADA access, in conjunction with an upland multifamily redevelopment in the Biscayne Bay Aquatic Preserve. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 15. FIRM NAME AND LOCATION (City and State) Cummins Cederberg, Inc. South Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B. Sc. Environmental and Marine Science M.P.S. Environmental and Marine Science 12. NAME Elizabeth Jones 13. ROLE IN THIS CONTRACT Marine Biologist 14. YEARS EXPERIENCE a. TOTAL 4 b. WITH CURRENT FIRM 3 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) MOCC Boating Certification AAUS Scientific Diver Authorization PADI Advanced Diver and Rescue Diver Certified 19. RELEVANT PROJECTS STANDARD FORM 330 (6/2004) PAGE 1 a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm b. Sunny (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm e. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Coastal Towers Marina and Shoreline Stabilization Project, Sunny Isles fPerformed marine resource surveys along 2,300 linear feet of seawall to assess potential impacts o hdevelopment and identify corals and seagrass located within the project footprint. Coordinated wit DERM, DEP, NMFS and USACE to obtain environmental permits for construction activities. Winston Tower 700 Pelican Island Docking Facility, Miami Performed marine resource surveys to identify species of concern at the project site, developed coral relocation plan and coordinated with DERM,DEP and USACE to obtain environmental permits. Crandon Park Northern Shoreline Stabilization, Key Biscayne Conducted marine resource and mangrove surveys to identify and delineate areas of natural resources. Developed a mangrove restoration plan to provide enhanced shoreline protection and increase local biodiversity. Coordinated with DERM, DEP and USACE to obtain permits. (1) TITLE AND LOCATION (City and State) JCC Kayak Dock, Miami Beach , 2018 on-going 2016 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Construction of 240 feet of seawall and repair of 800 feet of seawall for shoreline stabilization at large condominium. Above/below water condition inspection, seawall replacement and repair design permit application and processing (DERM/USACE/DEP), construction administration. 2017 2018 Check if project performed with current firm 2017 on-going 2015 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Coordinated with County, State and Federal (DERM, FDEP, USACE, respectively) permitting agencies to design a mitigation plan for Johnson's seagrass, which was identified at the project site. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 15. FIRM NAME AND LOCATION (City and State) Cummins Cederberg, Inc. South Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B. Sc. Environmental and Marine Science M.P.S. Environmental and Marine Science 12. NAME Elizabeth Jones 13. ROLE IN THIS CONTRACT Marine Biologist 14. YEARS EXPERIENCE a. TOTAL 4 b. WITH CURRENT FIRM 3 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) MOCC Boating Certification AAUS Scientific Diver Authorization PADI Advanced Diver and Rescue Diver Certified 19. RELEVANT PROJECTS STANDARD FORM 330 (6/2004) PAGE 2 f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm h. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm j. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ocean Cay Development, Bahamas Marine resource surveys were completed to provide an understanding of the existing conditions of the marine ,environment surrounding Ocean Cay. The assessment included roving and transect surveys, detailed habitat mapping and photo and video surveillance. Data was analyzed to identify specifies abundance and diversity, habitat complexity, as well as overall resources complexity and health at the Project site. Prepared an Environmental Impact Assessment for the Bahamas Environment Science and Technology Commission (BEST). Crandon Park Swim Zone, Key Biscayne Coco Plum Beach (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted a marine resource survey at designated survey sites planning approximately 3 miles of Biscayne Bay to identify and delineate areas with marine resources (seagrass, corals, or other organisms of significance) within the proposed buoy locations. Coordinated with DERM, DEP, USCG and FWC to obtain permits for creating a vessel-free swim zone. Above and below water inspection of existing concrete dock structure components and wave attenuator. Engineering design and environmental permitting of dock repairs based on inspection findings, including cracks, spalling, and deck slab replacement. Coastal and structural feasibility analyses of potential wave attenuator improvements to achieve acceptable wave conditions within marina. Sunset Harbour Yacht Club Docks & Wave Attenuator, Miami Beach One Miami Condominium Seawall, Miami Dade County, Florida Environmental permitting for 900 feet bulkhead repair project. Developed permit strategy as well prepared and processed permit applications with the various stakeholders. Prepared bid documents for contractor selection. Marine resource mapping for proposed beach nourishment project. GIS mapping of marine resources for incorporation in engineering design. Feasibility study and pre-application meetings with environmental agencies relative to discuss initial concerns and adjust engineering design. Preliminary mitigation plan prepared. 2017 2017 on-going 2016 2016 2017 on-going 2015 2015 N/A 1,000 LF of existing bulkhead replacement on West shore of Watson Island with anchored steel sheet dpiling. Submerged Mediterranean mooring anchors, consisting of composite steel/auger piles connecte Managed project that involved extensive project team and agency coordination. Conducted sovereign submerged lands research relative to historical mooring and the Butler Act Disclaimer. Secured permits from the USACE, DEP, and DERM, as well as sovereign submerged lands authorization via a lease, for a 16 slip public docking facility, where seagrass is present, in the Biscayne Bay Aquatic Preserve. Performed marine resource surveys along 2300 liner feet of seawall to assess potential impacts of development and identify corals and seagrass located within the project footprint. Coordinated with DERM, DEP, NMFS and USACE to obtain environmental permits for construction activities. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jason S. Taylor, M.Sc., P.E. 13. ROLE IN THIS CONTRACT Senior Engineer 14. YEARS EXPERIENCE a. TOTAL 16 b. WITH CURRENT FIRM 1 15. FIRM NAME AND LOCATION (City and State) Cummins Cederberg, Inc. South Miami, Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Special Inspector Advanced Open Water SCUBA American Institute of Steel Construction (AISC) 19. RELEVANT PROJECTS a. (2) YEAR COMPLETED CONSTRUCTION (If applicable) b. (2) YEAR COMPLETED c. (2) YEAR COMPLETED d. with mooring chain. Mooring dolphins consisting of large diameter steel pipe piles. (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm e. (2) YEAR COMPLETED STANDARD FORM 330 (REV. 8/2016) PAGE 1 16. EDUCATION (Degree and Specialization) B. S.C., Civil Engineering 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer, Florida (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES (1) TITLE AND LOCATION (City and State) CONSTRUCTION (If applicable)PROFESSIONAL SERVICES (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Coastal Towers Marina and Shoreline Stabilization Project, Sunny Isles Bentley Bay Marina, Miami Beach Island Gardens Mega Yacht Harbor, Miami Marina Palms, North Miami Beach ksReplacement of existing derelict marina for new condominium development. New concrete doc and steel sheet pile seawall. Haulover Marine Facility, Dade County 2017 on-going 2018 2018 2015 2015 2015 2015 2014 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm New bulkhead and platform construction to support forklift launching operations. Steel sheet piles and concrete auger piles. New trash facility with truck ramp supported by perimeter cantilevered concrete retaining wall. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jason S. Taylor, M.Sc., P.E. 13. ROLE IN THIS CONTRACT Senior Engineer 14. YEARS EXPERIENCE a. TOTAL 16 b. WITH CURRENT FIRM 1 15. FIRM NAME AND LOCATION (City and State) Cummins Cederberg, Inc. South Miami, Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Special Inspector Advanced Open Water SCUBA American Institute of Steel Construction (AISC) 19. RELEVANT PROJECTS f. (2) YEAR COMPLETED CONSTRUCTION (If applicable) g. (2) YEAR COMPLETED h. (2) YEAR COMPLETED i. (2) YEAR COMPLETED j. (2) YEAR COMPLETED STANDARD FORM 330 (REV. 8/2016) PAGE 2 16. EDUCATION (Degree and Specialization) B. S.C., Civil Engineering 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer, Florida (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES (1) TITLE AND LOCATION (City and State) CONSTRUCTION (If applicable)PROFESSIONAL SERVICES (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm CONSTRUCTION (If applicable) Keystone Point Marina, North Miami Bulkhead replacement with concrete sheet piling and steel king piles. New concrete launching platform supported on steel piling. Bimini Bay Ferry Terminal, Bahamas Design of 30'W x 1,600 LF access pier for new cruise terminal. Precast concrete planks, lcaps and steel pipe piling supporting truck traffic. Concrete topping slab pavement. Stee sheet pile abutment at island. Rickenbacker Shoreline Improvement, Miami t Museum Park, Miami Miami Marine Stadium Marina, Miami New bulkhead and platform construction to support forklift launching operations. Steel sheet piles and concrete auger piles. 2014 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm 2014 2014 2013 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design of steel sheet pile retaining wall system along shoreline to suppor public traffic, including emergency vehicular loads. 2014 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design and Construction Administration of site civil concrete structures. 2015 American Society of Civil Engineers award for Outstanding Project, Category III. 2014 2014 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 15. FIRM NAME AND LOCATION (City and State) Cummins Cederberg, Inc. South Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) B. S.C., Civil Engineering M. S.C., Coastal Engineering 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Engineering Intern Florida Board of Professional Engineers. STANDARD FORM 330 (6/2004) PAGE 1 12. NAME Leonard Barrera Allen 13. ROLE IN THIS CONTRACT Project Engineer 14. YEARS EXPERIENCE a. TOTAL 3 b. WITH CURRENT FIRM 3 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Member of American Society of Civil Engineers Member of Society of Hispanic Professional Engineers Member of Florida Water Environment Association 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Check if project performed with current firm c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm d. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm e. (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Crandon Shoreline Stabilization, Crandon Park Stabilization of approximately 315 linear feet of shoreline in Crandon Park, Key Biscayne. Design of the shoreline stabilization using rock revetment composed of native lime rock. Created an approximate area of 2,800 square feet for the planting of mangroves located directly behind the rock revetment. NDWWTP Groundwater Evaluation for the North Dade Wastewater Treatment Plant (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE An evaluation of the effects of sea level rise on groundwater levels was conducted and recommendations were provided relative to the location of future infrastructure at the rwastewater treatment plant. The analysis was based on existing studies for Miami and othe relevant coastal areas. FDOT A1A Coastal Analysis, Indian River County Scour and wave load analysis for proposed seawall for almost 2 miles of shoreline that experienced significant erosion during Hurricane Matthew. A hydrodynamic MIKE21 model was established to simulate tidal and storm surge flow. The model was calibrated relative to site specific current measurements obtained. (1) TITLE AND LOCATION (City and State) Coastal Towers, Sunny Isles Beach Replacement of approximately 1,500 linear feet of failed seawall and creation of a new 33-slip timber marina. The failed segments were replaced with a rock revetment, thereby significantly reducing cost to the owner of the project. The structural design of the timber marine was optimized to reduce the previous marina footprint and material costs. (1) TITLE AND LOCATION (City and State) Ocean Cay Development, Bahamas Marine resource surveys were completed to provide an understanding of the existing conditions of the marine environment surrounding Ocean Cay. The assessment included the roving and transect surveys, detailed habitat mapping, and photo and video surveillance. Data was analyzed to identify species abundance and diversity, habitat complexity, as well as overall resource complexity and health at the Project site. Prepared an Environmental Impact Assessment for the Bahamas Environment Science and Technology Commission (BEST). 2017 on-going 2017 2017 2017 2015 N/A N/A on-going on-going E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 15. FIRM NAME AND LOCATION (City and State) Cummins Cederberg, Inc. South Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) B. S.C., Civil Engineering M. S.C., Coastal Engineering 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Engineering Intern Florida Board of Professional Engineers. STANDARD FORM 330 (6/2004) PAGE 2 12. NAME Leonard Barrera Allen 13. ROLE IN THIS CONTRACT Project Engineer 14. YEARS EXPERIENCE a. TOTAL 3 b. WITH CURRENT FIRM 3 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Member of American Society of Civil Engineers Member of Society of Hispanic Professional Engineers Member of Florida Water Environment Association 19. RELEVANT PROJECTS f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) g. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) h. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm i. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm j. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Winston Towers 700, Sunny Isles Beach (1) TITLE AND LOCATION (City and State) 14 Street End Seawall, Miami Beach les. ll. (1) TITLE AND LOCATION (City and State) Seacor Island Lines Terminal RoRo Ramp Slab, Fort Lauderdale rtReplacement of 320 square feet of Seacor's Island Lines Terminal Roll On/Roll Off (RoRo) ramp in Fo newLauderdale. The design consisted of replacing the failed structural segment and replacing it with a redesigned slab connected to the existing structure. In addition to the installation of a new slab, repairs were specified along the bulkhead that connected to the RoRo ramp slab. (1) TITLE AND LOCATION (City and State) Coco Plum Beach Restoration, Marathon, Monroe County Structural design of 16-slip reinforced concrete marina located in Miami Beach. The marine consisted of reinforced concrete beams, pile caps, and fiberglass grating. The structural design was optimized to reduce the number of materials required while maintaining an aesthetically pleasing marina. ailedErosion study and preparation of beach design involving coastal structures to provide long term stability. A det ancedstatistical analysis of offshore wave data was conducted along with a wave propagations study. Utilizing the adv g theMIKE21 wave model, the wave trans-formation from offshore to nearshore was analyzed. The sediment transport alon inproject area was simulated. The underlying coastal processes of the erosion trends were documented and utilized entthe beach and coastal structure design process. Identification of the area triggering beach erosion and developm (1) TITLE AND LOCATION (City and State) Bentley Bay Marina, Miami Beach of solutions for stabilizing the area. 2016 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Replacement of approximately 240 linear feel of concrete seawall with new steel sheet piles and reinforced capping beam. Additionally, repairs were specified for the remaining 820 linear feet of seawall.Preliminary inspection conducted to identify structural elements that needed replacement of repairs. Structural calculations were performed to select the most economical sheet pile sections. 2016 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Structural design of 85 linear feet of seawall located at the 14th Street end of Miami Beach. The seawallincluded two cutouts for a 60-inch diameter reinforced concrete pipe and a 36-inch diameter reinforcedconcrete pipe. The structural design consisted of reinforced capping beams, panels and pi In addition, the installation also required a rock revetment located directly in front of the seawa 2017 2017 2017 2018 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm N/A E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (continued) (Complete one Section E for each key person.) 12. NAME Jonathon Allen Cunningham 13. ROLE IN THIS CONTRACT Project Engineer 14. YEARS EXPERIENCE a. TOTAL 2 b. WITH CURRENT FIRM 2.5 Months 15. FIRM NAME AND LOCATION (City and State) Cummins Cederberg, Inc. South Miami and Jupiter, Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Member of American Society of Civil Engineers (ASCE) Member of Florida Association of Environmental Professionals 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Structural Analysis/Design, Lancaster City, Pennsylvania (2) WEEKS COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted a structural analysis and repair plan design for a failing 3-wythe exterior brick wall which was bowing outward greater than 1-1/4” at the second floor-framing line. Structural analysis to determine the structural integrity of existing brick and mortar, structural design of new beam and column framing system to divert loads from existing wall, structural design of tie backs to secure existing wall to floor framing. b. (1) TITLE AND LOCATION (City and State) Commercial Building Renovation, Mechanicsburg, Pennsylvania 0.5 YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted existing condition inspection of PEMB commercial building for additions and structural renovations. Performed structural analysis of existing steel and masonry framing systems for addition loads. Performed timber, steel and concrete structural design for roof structure and store-front additions. c. (1) TITLE AND LOCATION (City and State) Structural Condition Inspections, Pennsylvania (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016-2017 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Performed greater than 65 structural condition inspections for residential and commercial buildings including condition and structural integrity assessment of timber, steel, concrete and masonry buildings. Drafted detailed inspection reports and designed structural repair plans. d. (1) TITLE AND LOCATION (City and State) Marina Inspection, Turks & Caicos Islands 3 DAYS COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Above and under water inspection and condition assessment of 1,600+ LF of existing concrete floating docks and steel piles. e. (1) TITLE AND LOCATION (City and State) Ocean Breeze Mobile Home Resort, Marathon, Florida (1) MONTH COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Structural design for 170+ LF of concrete pile/panel seawall including reinforced concrete cap design, pre- stressed and pre-cast concrete pile design, reinforced concrete wall panel design. Structural design for 500 SF of timber dock structures including timber framing design and timber pile design. STANDARD FORM 330 (REV. 3/2013) PAGE 1 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineering 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Engineer Intern F. Example Projects (Present as many projects as requested by the agency, or 10 projects, if not specified. Co mplete one Section F for each project) 20. 1 21. TITLE AND LOCATION (City and State) Coco Plum Beach Restoration and Shoreline Stabilization, Marathon Monroe County, Florida 22. YEAR COMPLETED: PROFESSIONAL SERVICES 2017 CONSTRUCTION NA 23. PROJECT OWNER'S INFORMATION a. PROJECT OW NER City of Marathon b. POINT OF CONTACT NAME Carlos Solis c. POINT OF CONTACT TELEPHONE NUMBER 305-289-5008 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Summary: Bathymetric surveying, coastal engineering analysis, wave modeling, sediment transport modeling, marine resource mapping, breakwater and beach design, permitting feasibility, funding opportunities. Relevance: The Project demonstrates knowledge of Florida beach design, permitting constraints and funding. The Project demonstrates the ability to conduct complex coastal engineering analyses utilizing state of the art numerical modeling software as well as preparing beach and breakwater design . The Project demonstrates innovative design to meet client objectives and budget, while minimizing environmental impacts. Project Schedule/ Actual Schedule: On schedule. Scope: Engineer and Marine Scientist Size: 5,000 feet of shoreline Construction Cost: $1M (est.) Description: Coco Plum Beach is located along the southeast coast of Marathon in the Florida Keys. The beach has historically experienced significant erosion requiring costly beach fill projects along with the nuisance of construction and periods with limited beach use area. Extensive beds of seagrass are located throughout the area. Cummins Cederberg was retained to conduct an erosion study and prepare a beach design, involving coastal structures to provide long term stability. As part of the erosion study, a detailed statistical analysis of offshore wave data was conducted along with a wave propagations study. Sediment transport and potential erosion are typically governed by the wave conditions. Utilizing the advanced MIKE21 wave model, the wave transformation from offshore to nearshore was analyzed. The detailed wave modelling allowed for detailed review and comparison of the wave climate along the beach as well as assessing sediment transport rates. Based on the results of the wave modeling and sediment transport study, the underlying coastal processes of the erosion trends, were documented and utilized in the beach and coastal structure design process. The area triggering the beach erosion was identified and solutions for stabilizing this area, while still providing sandy beach access, were developed. Understanding the underlying coastal processes allowed for an efficient design that works with the natural processes, thus reducing long term maintenance typically associated with projects working against nature. 25. FIRMS FROM SECT ION C INVOLVED WIT H T HIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a Cummins Cederberg, Inc. Miami, Florida Engineer AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004 • • • F. Example Projects (Present as many projects as requested by the agency, or 10 projects, if not specified. Co mplete one Section F for each project) 20. 2 21. TITLE AND LOCATION (City and State) 47th Street Beach Restoration Miami Beach, Florida 22. YEAR COMPLETED: PROFESSIONAL SERVICES 2015 CONSTRUCTION 2015 23. PROJECT OWNER'S INFORMATION a. PROJECT OW NER Miami Dade County b. POINT OF CONTACT NAME Jamie Monty c. POINT OF CONTACT TELEPHONE NUMBER (305) 372-6853 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Summary Engineering analysis and beach design, environmental permitting assistance, construction administration Relevance • The project demonstrates knowledge of design, permitting and construction of beach nourishment projects. • The project demonstrates the ability to process and obtain approval by regulatory agencies. • The project includes a variety of components typical for beach project in Florida. Project Schedule/ Actual Schedule On schedule. Scope: Engineer and Project Manager Size: 20.000 Cubic Yards Construction Cost: $ (est.) Description: Cummins | Cederberg was engaged by Miami Dade County to design a 20,000-cubic yard beach fill project in a highly-eroded area. The project area experienced significant erosion following a series of winter storms causing extensive erosion of the established dune system and preventing access for emergency vehicles. In addition, the beach area fronts several upscale condominiums and hotels, which requested prompt resolution. Cummins Cederberg developed concept drawings swiftly in order to initiate the permit process. The design included consideration to the existing dune and berm as well the general federal beach design requirements. An Equilibrium Toe of fill study was subsequently prepared to assess potential impacts to nearshore hardbottom. 25. FIRMS FROM SECT ION C INVOLVED WIT H T HIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a Cummins Cederberg, Inc. Miami, Florida Engineer STANDARD FORM 330 (6/2004) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 F. Example Projects (Present as many projects as requested by the agency, or 10 projects, if not specified. Co mplete one Section F for each project) 20. 3 21. TITLE AND LOCATION (City and State) Crandon Park Mari na Sedimentation Study, Village of Key Biscayne, Florida 22. YEAR COMPLETED: PROFESSIONAL SERVICES 2012 CONSTRUCTION N/A 23. PROJECT OWNER'S INFORMATION a. PROJECT OW NER Miami Dade County Parks, Recreation and Open Spaces b. POINT OF CONTACT NAME Angel Trujillo c. POINT OF CONTACT TELEPHONE NUMBER (305) 755-7972 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Summary Marine resource mapping, engineering analysis and seawall design, environmental permitting feasibility Relevance • The project demonstrates knowledge of coastal and marine design conditions (i.e. hurricanes) utilizing advanced numerical hydrodynamic and wave models. • The project demonstrates unique knowledge of tidal flow conditions in Biscayne Bay. • The project includes a variety of components typical for Miami Beach. Project Schedule/ Actual Schedule On schedule. Scope: Environmental Scientist, Engineer and Project Manager Size: Approximately 1,500 feet of shoreline Construction Cost: $400,000 (est.) Description: Crandon Marina is located along the northwest shoreline of Key Biscayne fronting Biscayne. Severe sedimentation occurs in the northwestern portion of the marina. Cummins Cederberg was selected to determine the source and cause of the sedimentation as well as provide a solution. The Project area is exposed to both high tidal currents and wind generated waves in Biscayne Bay. Due to the large tidal prism in Biscayne Bay, and limited flow pathways in north Biscayne Bay, high current speeds are experienced during ebb and flood tide in Bear Cut. Field investigations including surveying, marine resource mapping, sediment sampling, as well as tide and current measurements were performed. A wave analysis was subsequently conducted to understand wave characteristics during normal conditions for the subsequent sediment transport assessment, and extreme wave conditions for the design of coastal structures. A detailed numerical hydrodynamic model was developed to simulate the tidal flow within Biscayne Bay and specifically the tidal flow patterns at the Project site. Based on the results of the wave and hydrodynamic analyses, the sediment transport at the site was assessed to understand the governing mechanism. Concepts to eliminate or reduce sedimentation were developed and compared relative to the current practice of dredging. The comparison included short and long-term costs, along with environmental and engineering constraints. Cummins Cederberg was subsequently winded to implement shoreline stabilization measures. 25. FIRMS FROM SECTION C INVOLVED WIT H T HIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a Cummins Cederberg, Inc. Miami, Florida Engineer STANDARD FORM 330 (6/2004) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 F. Example Projects (Present as many projects as requested by the agency, or 10 projects, if not specified. Co mplete one Section F for each project) 20. 4 21. TITLE AND LOCATION (City and State) Bentley Bay Marina City of Miami Beach, Florida 22. YEAR COMPLETED: PROFESSIONAL SERVICES 2016 CONSTRUCTION 2017 23. PROJECT OWNER'S INFORMATION a. PROJECT OW NER SRC Properties, LLC b. POINT OF CONTACT NAME Robert Alexander c. POINT OF CONTACT TELEPHONE NUMBER (305) 674.0600 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Summary: Engineering analysis and design, permitting and construction administration for a new marina. Relevance: ▪ The project demonstrates knowledge of marina design and permitting. ▪ The project demonstrates the ability to process and obtain complex approvals by regulatory agencies. ▪ The project demonstrates knowledge of Florida Building Code. Project Schedule/ Actual Schedule: On schedule. Scope: Engineering, permitting and project management Size: 16 Slips Construction Cost: $1,200,000 Description: Design and permitting of a new 16-slip marina in the Biscayne Bay Aquatic Preserve (BBAP) and adjacent to the MacArthur Causeway. New marinas in the BBAP are typically not allowed to be constructed on sovereign submerged land; however, through research of submerged land ownership and historical use at the Project site, as well as extensive negotiations with the regulatory agencies, permits and a sovereign submerged lands lease, were obtained for the new marina. The marina was designed utilizing concrete piles, cap and beams with grated decking, as required to allow for adequate light penetration to reach the submerged bottom supporting seagrass habitat. Structural design of the docks relative to extreme conditions and vessel loads was conducted. Design services also included material selection and coordination of utilities. Construction administration was performed including bidding, inspections, field reports and permit close-out. 25. FIRMS FROM SECT ION C INVOLVED WIT H T HIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a Cummins Cederberg, Inc. Miami, Florida Engineer STANDARD FORM 330 (6/2004) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 F. Example Projects (Present as many projects as requested by the agency, or 10 projects, if not specified. Co mplete one Section F for each project) 20. 5 21. TITLE AND LOCATION (City and State) Costa Brava Marina D esign, City of Miami Beach, Florida 22. YEAR COMPLETED: PROFESSIONAL SERVICES 2014 CONSTRUCTION 2014 23. PROJECT OWNER'S INFORMATION a. PROJECT OW NER Costa Brava Condominium Association b. POINT OF CONTACT NAME David Phillips c. POINT OF CONTACT TELEPHONE NUMBER (305) 532-6397 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Summary Engineering analysis, environmental permitting, construction admi nistration Relevance • The project demonstrates knowledge of large marine projects. • The project demonstrates the ability to process and obtain approval by regulatory agencies. • The project demonstrates local knowledge. Project Schedule/ Actual Schedule On schedule. Scope: Engineer and Project Manager Size: Approximately 180 feet of wall and 4,000 sf of wetland Construction Cost: $400,000 (est.) Description: The Costa Brava Marina was severely damaged during the series of Hurricanes that impacted south Florida in 2004 and 2005. Cummins Cederberg was ultimately retained by the Costa Brava Condominium Association to obtain environmental permits and engineering analysis for the reconstruction of the 32-slip marina. The project was originally initiated more than 5 years earlier and had gone through several marine consultants without any significant progress in obtaining permits, including multiple denials. The agencies finally presented the Association with a 3-month deadline before closing all applications, which would result in loss of all permit fees paid and any work presented. Cummins Cederberg immediately reviewed the complete project history and met personally with all stakeholders. Several meetings were conducted with the various environmental agencies (DERM, FDEP and USACE) to understand concerns and provide all required information in order to obtain approval before the 3-month deadline. Although several applications required a complete restart, the thorough documentation, attentive meetings and phone calls resulted in environmental regulatory approval within the 3-month deadline. Cummins Cederberg was subsequently engaged to manage the bid process, the selection of a qualified marine contractor and overseeing successful construction. 25. FIRMS FROM SECT ION C INVOLVED WIT H T HIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a Cummins Cederberg, Inc. Miami, Florida Engineer and property manager. STANDARD FORM 330 (6/2004) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 F. Example Projects (Present as many projects as requested by the agency, or 10 projects, if not specified. Co mplete one Section F for each project) 20. 6 21. TITLE AND LOCATION (City and State) Sunset Harbour Yacht Club Concrete Dock Repairs and Wave Attenu ator, City of Miami Beach, Florida 22. YEAR COMPLETED: PROFESSIONAL SERVICES 2013 CONSTRUCTION 2014 23. PROJECT OWNER'S INFORMATION a. PROJECT OW NER Sunset Harbour Yacht Club b. POINT OF CONTACT NAME Doug Mason c. POINT OF CONTACT TELEPHONE NUMBER (305) 398-6800 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Summary Above/below water engineering inspection, bathymetric surveying, engineering analysis and concrete repair design, environmental permitting Relevance • The project demonstrates knowledge of above/below water inspections and concrete dock repair in sensitive area (i.e. large yachts). • The project demonstrates the ability to process and obtain approval by regulatory agencies. • The project includes a variety of components typical for marine projects. • The project demonstrates local knowledge. Project Schedule/ Actual Schedule On schedule. Scope: Engineer and Project Manager Size: ~125 slip marina Construction Cost: $300,000 Description: The Sunset Harbour Yacht Club is located in Miami Beach and is characterized with 125 slips, catering to vessels ranging from 45 to 150 feet in length. The marina consists of concrete slabs, piles and caps, which had deteriorated. Cummins Cederberg was retained t o conduct an above and below water structural inspection of the existing dock components to ensure the dock could withstand the large loading associated with the yachts. Based on the inspection findings, Cummins Cederberg performed engineering design of recommended repairs, and processed the proposed marine works through the environmental regulatory agencies (DERM, FDEP, and USACE). In addition, Cummins Cederberg assisted with the bid solicitation process, marine contractor selection and construction admi nistration. Mr. Cederberg and Mr. Cummins were both involved in all components of the project. 25. FIRMS FROM SECT ION C INVOLVED WIT H T HIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a Cummins Cederberg, Inc. Miami, Florida Engineer STANDARD FORM 330 (6/2004) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 F. Example Projects (Present as many projects as requested by the agency, or 10 projects, if not specified. Co mplete one Section F for each project) 20. 7 21. TITLE AND LOCATION (City and State) Winston Tower 700, Sunny Isles Beach 22. YEAR COMPLETED: PROFESSIONAL SERVICES 2015 CONSTRUCTION 2015 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Winston Tower 700 b. POINT OF CONTACT NAME Howard Gordon c. POINT OF CONTACT TELEPHONE NUMBER (305) 931-5998 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Summary Underwater inspection, engi neering analysis and seawall design, environmental permitting, construction administration Relevance • The project demonstrates knowledge of complex coastal and marine design conditions (i.e. hurricanes). • The project demonstrates the ability to process and obtain approval by regulatory agencies. • The project demonstrates flexibility in developing design solutions for that meet within budget constraints. Project Schedule/ Actual Schedule On schedule. Scope: Engineer and Project Manager Size: 1040 Feet of Seawall Construction Cost: 700.000 (est.) Description: Cummins Cederberg was engaged to assess and rehabilitate an existing seawall for a waterfront condominium at the Intracoastal Waterway. A portion of the seawall was stabilizing the entrance road but had severely deteriorated, which could affect access to the property. Cummins Cederberg conducted a in-water inspection of the seawall to determine level of deterioration. As construction cost was a concern, the most severe and important areas were determined for full replacement while interim repairs were conducted in other areas to prolong service life. A combined repair and replacement project designed and permitted. Cummins Cederberg processed and obtained all the required environmental permits from Miami-Dade County DERM, Florida Department of Environmental Protection and US Army Corps of Engineers. As part of construction administration services, Cummins Cederberg interviewed and obtained bids from qualified marine contractors and provided recommendations for the Condominium Association. Cummins Cederberg served as inspector and monitored construction with field reports for the documentation and for the Condominium Association to follow progress. 25. FIRMS FROM SECT ION C INVOLVED WIT H T HIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a Cummins Cederberg, Inc. Miami, Florida Engineer STANDARD FORM 330 (6/2004) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 F. Example Projects (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project) 20. 8 21. TITLE AND LOCATION (City and State) Dade Blvd/Collins Canal Seawall Replacement, City of Miami Beach, Florida 22. YEAR COMPLETED: PROFESSIONAL SERVICES 2013 CONSTRUCTION 2013 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Miami Beach b. POINT OF CONTACT NAME Hermes Diaz c. POINT OF CONTACT TELEPHONE NUMBER (305) 416-1047 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Summary Engineering analysis and design, construction administration Relevance The project demonstrates knowledge of large marine projects in complex area (i.e. utility lines, roads, traffic lights). The project demonstrates the ability to interact efficiently and cordially with City staff. The project demonstrates local knowledge and unique experience critical utility lines for the City. Project Schedule/ Actual Schedule On schedule. Scope: Engineer and Project Manager Size: Approximately 2,700 feet of seawall Construction Cost: ~$3,000,000 Description: Dade Boulevard, located in Miami Beach, is situated alongside the Collins Canal. It is an east-west connecting road and thus crosses many of the main avenues on the barrier island. As part of the construction of a bike path along the road, shoreline stabilization was required. Cummins | Cederberg was retained to design the 2,700 feet of steel sheet pile bulkhead along the canal, including a concrete cap. Due to the close proximity to the road, a concrete crash barrier capable of withstanding vehicle impacts was incorporated as well. The bulkhead design was further complicated by extensive below ground utilities in the area. These included main sewer, water, and high-voltage electrical lines connecting the northern and southern parts of Miami Beach. Some of the utilities were of significant age, thus limited information relative to dimensions, locations, and depth were available. In these cases, the contractor and engineer were required to hand excavate to physically locate the lines and subsequently maintain a safe buffer with pile driving. The required buffer produced opportunities for unique and innovative structural designs in order to create a wall in the areas of the utilities without driving piles, while still capable of retaining the relatively large earth and vehicle loads. The south side of the canal generally consisted of older residences, approximately 50 feet from the proposed bulkhead. In order to ensure no impacts to these structures during vibratory installation of the steel sheet piles, Cummins Cederberg was retained to conduct vibration monitoring during construction. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a Cummins Cederberg, Inc. Miami, Florida Engineer STANDARD FORM 330 (6/2004) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 F. Example Projects (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project) 20. 9 21. TITLE AND LOCATION (City and State) North District Wastewater Treatment Plant Storm Surge and Sea Level Rise Assessment, City of North Miami, FL 22. YEAR COMPLETED: PROFESSIONAL SERVICES 2014 CONSTRUCTION N/A 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami Dade County (through Brown & Caldwell) b. POINT OF CONTACT NAME Jennifer Leone c. POINT OF CONTACT TELEPHONE NUMBER (561) 515-6249 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Summary Coastal Engineering analysis, Storm Surge Analysis, Sea Level Rise, Mangrove Assessment Relevance The project demonstrates knowledge of large infrastructure project. The project demonstrates the ability to work within a large team. The project demonstrates knowledge of critical issues (storm surge and sea level rise) important to the City. Project Schedule/ Actual Schedule On schedule. Scope: Engineer Size: Approximately 50 acres Construction Cost: N/A Description: A technical assessment of design conditions was conducted relative to the North District Wastewater Treatment Plant (NDWWTP) to evaluate potential sea level rise and storm surge impacts as part of the Ocean Outfall Legislation. Global and local sea level rise projections were reviewed relative to application, uncertainty and service life of infrastructure. An evaluation of storm surge impacts was conducted. Historical records along with published data and studies were reviewed relative to application and validity. Relevant data was reviewed, including information regarding historical storm tides in the vicinity, historical hurricane tracks, approach angles, wind direction variations and relationship between storm tide levels and wave impacts. The analysis indicated hurricanes with specific characteristics will cause a higher level of storm tide at NDWWTP and the design hurricane identified. A desktop study was conducted to preliminarily estimate the 100-year storm tide level for the NDWWTP. The preliminary analysis indicated an alternative flooding scenario may exist apart from a direct hit near NDWWTP, which were further analyzed through numerical modeling. Site specific conditions were reviewed relative to their effect on storm tide and associated processes, such as existing mangrove habitat. The probability of events with various return periods were estimated relative to varying service life allowing the Client to make informed decision regarding the design and service life. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a Cummins Cederberg, Inc. Miami, Florida Engineer • • • F. Example Projects (Present as many projects as requested by the agency, or 10 projects, if not specified. Co mplete one Section F for each project) 20. 10 21. TITLE AND LOCATION (City and State) Matheson Hammock Sea Level Rise Flood Mitigation Study, Coral Gables Miami-Dade County, Florida 22. YEAR COMPLETED: PROFESSIONAL SERVICES 2018 CONSTRUCTION NA 23. PROJECT OWNER'S INFORMATION a. PROJECT OW NER Miami Dade County b. POINT OF CONTACT NAME Jose A. Gonzalez c. POINT OF CONTACT TELEPHONE NUMBER 305-755-7833 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Summary: Underwater inspection, engineering analysis, coastal resiliency, sea level rise, flooding, marine resources, environmental permitting, flood mitigation design, planning, cost estimates. Relevance: The Project demonstrates knowledge of coastal resiliency and sea level rise. The Project demonstrates the ability to combine various disciplines to develop and plan long term solutions . The Project demonstrates innovative design to meet changing conditions and incorporate flexibility in designs . Project Schedule/ Actual Schedule: On schedule. Scope: Engineer, Marine Scientist and Project Manager Size: 120 acres Construction Cost: $50M (est.) Description: A technical assessment of the conditions at Matheson Hammock Park (Park) was conducted relative to developing flood mitigation concepts to limit impacts of sea level rise. Topographic LiDAR data was compiled and processed to develop a detailed topographic map of the Project area. A conditions inspection was conducted of the Park documenting the condition of all significant infrastructure components, along with anticipated service life. Environmental resources were preliminary assessed and mapped. An evaluation of typical and extreme tidal water levels was conducted to understand peak tidal levels and exceedance probability. Published sea level rise projections were reviewed and adopted for the study. A flood inundation model was developed to analyze areas of flooding and timeframes relative to sea level rise. Flood mitigation concepts were developed for major infrastructure components within the Park. The concepts were evaluated relative to urgency, construction costs, impacts to Park guests, permit feasibility and environmental impacts. An implementation schedule reaching the year 2100 was developed, outlining estimated infrastructure replacement dates, anticipated service life and required elevations based on the adopted sea level rise projection. 25. FIRMS FROM SECT ION C INVOLVED WIT H T HIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a Cummins Cederberg, Inc. Miami, Florida Engineer AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004 Jannek Cederberg Jason Cummins Gina Chiello Elizabeth Jones Leonard Barrera Jason Taylor Jon Cunningham Senior Engineer Senior Engineer Senior Project Manager Marine Biologist Project Engineer Senior Engineer Project Engineer Coco Plum Miami-Dade Truck Haul - 47th Street Crandon Park Marina Sedimentation Bentley Bay Marina Costa Brava Marina Sunset Harbor Yacht Club Winston Tower 700 Seawall Project Dade Blvd. Seawall Replacement Matheson Hammock Sea Level Rise Flood Mitigation Study NDWWTP Storm Surge & Sea Level Rise Assessment X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Cummins | Cederberg 7550 Red Road, Suite 217 ▪ South Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com CUMMINS | CEDERBERG Coastal & Marine Engineering March 22, 2018 City of Sunny Isles Beach City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 Re: CUMMINS CEDERBERG, INC. CBE STATUS Dear Sir/Madam: Cummins Cederberg, Inc. is a certified CBE firm by Miami-Dade County. The County has not provided an updated certificate so the previous one is attached. Any questions related to our CBE status can be directed to: Rokeishanik ‘Keisha’ Dabney, MPA, Contract Certification Specialist II Miami-Dade County Internal Services Department Small Business Development Division 111 NW 1st Street, Suite 1900 Miami, Florida 33128 Phone: 305-375-3165 Email: Keisha.Dabney@miamidade.gov Should you have any questions or require additional information, please do not hesitate to contact me at 305 741 6155 or jcederberg@CumminsCederberg.com. Sincerely, CUMMINS CEDERBERG, INC. Jannek Cederberg, M.Sc., P.E. President Chen Moore & Associates – 330 Forms E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Gregory Mendez, P.E. 13. ROLE IN THIS CONTRACT Civil Engineering Project Manager 14. YEARS EXPERIENCE a. TOTAL 20 b. WITH CURRENT FIRM 3 15. FIRM NAME AND LOCATION (City and State) Chen Moore and Associates, Miami, FL 16. EDUCATION (Degree and Specialization) Bachelor of Engineering / Architectural Engineering 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) FL / Professional Engineer 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Mendez has more than 20 years of civil engineering experience in site and infrastructural development type projects for public and private facilities. He has extensive utilities design experience and is also very experienced with fast track projects. His experience includes water, drainage and sewer designs, design reviews, managing designs and construction budgets, managing field inspection staff and managing client relations. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Miami Beach Sunset Islands 3 & 4 ROW Improvement Program Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager and Engineer of Record. CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The project was publicly bid as a design-build and funded by the City of Miami Beach. It required coordination with various agencies including the City of Miami Beach, the Miami-Dade Water and Sewer Department, the Miami-Dade Public Works Department, the Miami-Dade Regulatory and Economic Resources Department and others. Cost $7.75 million; Fee: $505,953.76 b. (1) TITLE AND LOCATION (City and State) Vida at The Point Aventura, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager and Engineer of Record. Vida at the Point is a luxury waterfront townhome development in Aventura. CMA provided landscape architecture and civil engineering for the project. Fee: $53,380 c. (1) TITLE AND LOCATION (City and State) Central Bayshore South Right of Way Infrastructure Improvements Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager and Engineer of Record. The Central Bayshore South Right-of-Way Infrastructure Improvement Program is an approximately $18M Design-Build Project located in Miami Beach, Florida. The project limits stretch from Dade Boulevard north to West 34 Street and from Meridian Avenue east to the Indian Creek waterway. The project includes the reconstruction and elevation of roadways within the project area, driveway and swale harmonization, a new stormwater collection, conveyance, treatment, and pump station system, new transmission and distribution watermains, a new multi-use bike/pedestrian path, improved street lighting, improved roadway signage and pavement markings, and appropriate landscape mitigation. Cost: $18 million; Fee: $1,150,280 d. (1) TITLE AND LOCATION (City and State) Miami Springs Aquatic Center Miami Springs, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager and Engineer of Record. This was a Design Build project for the City of Miami Springs for a new aquatic facility. The project consisted of the demolition of the existing aquatic center facility and north parking lot as well as the construction of a new facility and parking lot in the north end of the site. The new facility includes a new Hybrid Pool and pool deck, an L-shaped building and a separate concessions building. The south leg of the building contains the locker rooms, rest rooms, pool equipment storage as well as the aquatic center administration offices. The west leg of the building contains a large multi-purpose room, reception hall, catering room, small restrooms and storage. Cost: $7 million; Fee: $37,412 e. (1) TITLE AND LOCATION (City and State) MB North Beach Master Plan Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager Supervisor. As a subconsultant to Dover Kohl and Associates, Chen Moore and Associates (CMA) was tasked with preparing the parking component of the district-wide master plan for the City of Miami Beach. CMA and the master plan team met with residents, City officials, local business owners and other stakeholders to determine the state of the existing parking throughout the North Beach District. A week long charrette and several public meetings were also held to gauge the parking and transportation needs. CMA prepared the portion of the master plan which outlined existing parking locations and inventory, identified potential parking solutions and recommended both short-term and long-term remedies for the district, in concert with the overall master plan. Fee: $25,000 STANDARD FORM 330 (REV. 8/2016) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jose L. Acosta, P.E., F.ASCE 13. ROLE IN THIS CONTRACT Principal-in-Charge 14. YEARS EXPERIENCE a. TOTAL 19 b. WITH CURRENT FIRM 7 15. FIRM NAME AND LOCATION (City and State) Chen Moore and Associates, Miami, FL 16. EDUCATION (Degree and Specialization) Masters of Business Administration / Master of Business Administration Bachelor of Science / Civil Engineering Bachelor of Science / Architectural Engineering 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) FL / Professional Engineer / Natl. Council of Examiners for Eng. & Surveying 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Acosta has over 19 years of design and project management experience in various industries, including municipal continuing service contracts, K-12 education, higher education, healthcare, transportation, and commercial/residential/industrial private development. His background includes neighborhood improvement projects, streetscape enhancements, utility relocation, on- and off-site infrastructure design, bidding assistance and construction administration services for several municipalities throughout Miami-Dade, Broward and Palm Beach Counties. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Miami Beach Sunset Islands 3 & 4 ROW Improvement Program Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Principal CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The project was publicly bid as a design-build and funded by the City of Miami Beach. It required coordination with various agencies including the City of Miami Beach, the Miami-Dade Water and Sewer Department, the Miami-Dade Public Works Department, the Miami-Dade Regulatory and Economic Resources Department and others. Cost $7.75 million; Fee: $505,953.76 b. (1) TITLE AND LOCATION (City and State) Central Bayshore South Right of Way Infrastructure Improvements Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Principal. The Central Bayshore South Right-of-Way Infrastructure Improvement Program is an approximately $18M Design- Build Project located in Miami Beach, Florida. The project limits stretch from Dade Boulevard north to West 34 Street and from Meridian Avenue east to the Indian Creek waterway. The project includes the reconstruction and elevation of roadways within the project area, driveway and swale harmonization, a new stormwater collection, conveyance, treatment, and pump station system, new transmission and distribution watermains, a new multi-use bike/pedestrian path, improved street lighting, improved roadway signage and pavement markings, and appropriate landscape mitigation. Cost: $18 million; Fee: $1,150,280 c. (1) TITLE AND LOCATION (City and State) South Pointe Phase III/IV/V - Right-of-Way Improvement Project Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Principal Project Manager. CMA was the prime consultant and was responsible for providing surveying, planning, geotechnical investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and inspection services for infrastructure improvements within the public right of way areas of the South Pointe III/IV/V neighborhood of Miami Beach. The project encompasses approximately 19,000 LF of ROW infrastructure improvements including 9,300 LF 8" water main replacements, stormwater drainage improvements, paving & grading, streetscaping enhancements, landscaping improvements, lighting improvements, and roadway reconstruction. Cost: $10.5 million; Fee: $2,305,354.06 d. (1) TITLE AND LOCATION (City and State) MB North Beach Master Plan Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Principal. As a subconsultant to Dover Kohl and Associates, Chen Moore and Associates (CMA) was tasked with preparing the parking component of the district-wide master plan for the City of Miami Beach. CMA and the master plan team met with residents, City officials, local business owners and other stakeholders to determine the state of the existing parking throughout the North Beach District. A week long charrette and several public meetings were also held to gauge the parking and transportation needs. CMA prepared the portion of the master plan which outlined existing parking locations and inventory, identified potential parking solutions and recommended both short-term and long-term remedies for the district, in concert with the overall master plan. Fee: $25,000 e. (1) TITLE AND LOCATION (City and State) Sunny Isles Beach Active Park (Pelican Community Park) Sunny Isles, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Project Manager. The 2.5-acre active park site design was designed to become the premier recreational park for the City of Sunny Isles Beach. The site is located at 18115 North Bay Road. The project included full design services for the city orchestrating park planning, paving, grading, drainage, water, sewer, irrigation, landscape architecture, architectural design, government permitting and construction administration services on a limited site. STANDARD FORM 330 (REV. 8/2016) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Peter Moore, P.E., F.ASCE, ENV SP, LEED AP 13. ROLE IN THIS CONTRACT QA/QC 14. YEARS EXPERIENCE a. TOTAL 20 b. WITH CURRENT FIRM 18 15. FIRM NAME AND LOCATION (City and State) Chen Moore and Associates, Fort Lauderdale, FL 16. EDUCATION (Degree and Specialization) Bachelor of Science / Civil Engineering Master of Engineering / Civil Engineering 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) FL / Professional Engineer 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) As the President of the firm, Mr. Moore is ultimately responsible for all day to day operations of the firm. Mr. Moore works as the Client Project Manager for work in Broward County, Pompano Beach and Deerfield Beach and continues to be involved in the successful completion of projects. These projects include sanitary collection improvements, pump station rehabilitation, transportation engineering enhancements, water and reclaimed water consulting along with all other phases of civil engineering design and neighborhood improvements. Additionally, Mr. Moore serves as the Assistant City Engineer for the City of Coral Springs and is the spokesperson for the City's Engineering Division. Finally, Mr. Moore serves on the firm’s QA/QC Committee ensuring the consistency of the quality product throughout the firm. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Miami Beach Sunset Islands 3 & 4 ROW Improvement Program Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The project was publicly bid as a design-build and funded by the City of Miami Beach. It required coordination with various agencies including the City of Miami Beach, the Miami-Dade Water and Sewer Department, the Miami-Dade Public Works Department, the Miami-Dade Regulatory and Economic Resources Department and others. Cost $7.75 million; Fee: $505,953.76 b. (1) TITLE AND LOCATION (City and State) Central Bayshore South Right of Way Infrastructure Improvements Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm The Central Bayshore South Right-of-Way Infrastructure Improvement Program is an approximately $18M Design-Build Project located in Miami Beach, Florida. The project limits stretch from Dade Boulevard north to West 34 Street and from Meridian Avenue east to the Indian Creek waterway. The project includes the reconstruction and elevation of roadways within the project area, driveway and swale harmonization, a new stormwater collection, conveyance, treatment, and pump station system, new transmission and distribution watermains, a new multi-use bike/pedestrian path, improved street lighting, improved roadway signage and pavement markings, and appropriate landscape mitigation. Cost: $18 million; Fee: $1,150,280 c. (1) TITLE AND LOCATION (City and State) South Pointe Phase III/IV/V - Right-of-Way Improvement Project Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm CMA was the prime consultant and was responsible for providing surveying, planning, geotechnical investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and inspection services for infrastructure improvements within the public right of way areas of the South Pointe III/IV/V neighborhood of Miami Beach. The project encompasses approximately 19,000 LF of ROW infrastructure improvements including 9,300 LF 8" water main replacements, stormwater drainage improvements, paving & grading, streetscaping enhancements, landscaping improvements, lighting improvements, and roadway reconstruction. Cost: $10.5 million; Fee: $2,305,354.06 d. (1) TITLE AND LOCATION (City and State) Euclid Streetscape Improvements (Lincoln Center Building) Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm CMA provided civil engineering and landscape architecture services for the pedestrianizing of Euclid Avenue between Lincoln Road and Lincoln Lane in the City of Miami Beach. The project requires coordination with various agencies including the City of Miami Beach Planning Department, Public Works, Greenspace management, and Capital Improvements, as well as Miami-Dade County Environmental Protection, Traffic, and Utilities. The scope of work includes providing site design and permitting including layout, hardscape, landscaping, lighting, drainage, and utilities. Cost: $502,000; Fee: $60,000 e. (1) TITLE AND LOCATION (City and State) Vida at The Point Aventura, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Vida at the Point is a luxury waterfront townhome development in Aventura. CMA provided landscape architecture and civil engineering for the project. Fee: $53,380 STANDARD FORM 330 (REV. 8/2016) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Patrick Kaimrajh, P.E. 13. ROLE IN THIS CONTRACT Sr. Engineer 14. YEARS EXPERIENCE a. TOTAL 9 b. WITH CURRENT FIRM 6 15. FIRM NAME AND LOCATION (City and State) Chen Moore and Associates, Miami, FL 16. EDUCATION (Degree and Specialization) Bachelor of Science / Civil Engineering 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) FL / Professional Engineer 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Kaimrajh, P.E. serves as a senior engineer for CMA and specializes in civil engineering design, drafting, permitting, and construction inspection. His 9 years of design experience includes paving, drainage and stormwater management, sanitary sewer and stormwater pump stations, water main, site development, and neighborhood improvement projects. He has prepared engineering drawings, cost evaluations, design reports and various permit applications. In addition, Mr. Kaimrajh has performed construction inspections for drainage, watermain, sanitary sewer, and pavement. He also is skilled in AutoCAD Civil3D, ICPR, EPA SWMM, Cascade, HY-8, WaterCAD, SewerCAD, and StormCAD, modeling and design software. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Miami Beach Sunset Islands 3 & 4 ROW Improvement Program Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Sr. Engineer. CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The project was publicly bid as a design-build and funded by the City of Miami Beach. It required coordination with various agencies including the City of Miami Beach, the Miami-Dade Water and Sewer Department, the Miami-Dade Public Works Department, the Miami-Dade Regulatory and Economic Resources Department and others. Cost $7.75 million; Fee: $505,953.76 b. (1) TITLE AND LOCATION (City and State) Central Bayshore South Right of Way Infrastructure Improvements Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Sr. Engineer. The Central Bayshore South Right-of-Way Infrastructure Improvement Program is an approximately $18M Design-Build Project located in Miami Beach, Florida. The project limits stretch from Dade Boulevard north to West 34 Street and from Meridian Avenue east to the Indian Creek waterway. The project includes the reconstruction and elevation of roadways within the project area, driveway and swale harmonization, a new stormwater collection, conveyance, treatment, and pump station system, new transmission and distribution watermains, a new multi-use bike/pedestrian path, improved street lighting, improved roadway signage and pavement markings, and appropriate landscape mitigation. Cost: $18 million; Fee: $1,150,280 c. (1) TITLE AND LOCATION (City and State) South Pointe Phase III/IV/V - Right-of-Way Improvement Project Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Sr. Engineer. CMA was the prime consultant and was responsible for providing surveying, planning, geotechnical investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and inspection services for infrastructure improvements within the public right of way areas of the South Pointe III/IV/V neighborhood of Miami Beach. The project encompasses approximately 19,000 LF of ROW infrastructure improvements including 9,300 LF 8" water main replacements, stormwater drainage improvements, paving & grading, streetscaping enhancements, landscaping improvements, lighting improvements, and roadway reconstruction. Cost: $10.5 million; Fee: $2,305,354.06 d. (1) TITLE AND LOCATION (City and State) Vida at The Point Aventura, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Sr. Engineer. Vida at the Point is a luxury waterfront townhome development in Aventura. CMA provided landscape architecture and civil engineering for the project. Fee: $53,380 e. (1) TITLE AND LOCATION (City and State) North Shore Bandshell Park Improvements Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Sr. Engineer. This project consists of proposed improvements to the existing Bandshell Park located east of Collins Avenue between 72nd and 73rd Streets within the City of Miami Beach. The project includes a new walkway connecting the park to the beachwalk at 72nd Street; the widening of the south sidewalk at 73rd Street. Chen Moore and Associates provided services including civil engineering, landscape architecture and irrigation design work that includes conceptual drawings for the 72nd Street walkway and 73rd Street sidewalk; design development/final design submittals; estimates of probable construction cost; government permitting (including Miami Beach, PERA - formerly DERM, FDOT, FDEP, and Fish & Wildlife); bidding assistance; and construction administration services. Cost: $1.4 million; Fee: $44,000 STANDARD FORM 330 (REV. 8/2016) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jason McClair, P.E., CFM, LEED AP 13. ROLE IN THIS CONTRACT Sr. Engineer 14. YEARS EXPERIENCE a. TOTAL 21 b. WITH CURRENT FIRM 16 15. FIRM NAME AND LOCATION (City and State) Chen Moore and Associates, Fort Lauderdale, FL 16. EDUCATION (Degree and Specialization) Bachelor of Science / Civil Engineering 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) FL / Professional Engineer 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. McClair is a senior civil engineer with more than 20 years of experience in utility infrastructure design, regulatory permitting, geotechnical engineering, and computer aided flow modeling for stormwater collection, water distribution, and sanitary transmission systems. He was the project manager for the Fort Lauderdale-Hollywood International Airport Stormwater Master Plan Update and the Pompano Beach Stormwater Master Plan. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Miami Beach Sunset Islands 3 & 4 ROW Improvement Program Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Sr. Engineer. CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The project was publicly bid as a design-build and funded by the City of Miami Beach. It required coordination with various agencies including the City of Miami Beach, the Miami-Dade Water and Sewer Department, the Miami-Dade Public Works Department, the Miami-Dade Regulatory and Economic Resources Department and others. Cost $7.75 million; Fee: $505,953.76 b. (1) TITLE AND LOCATION (City and State) Central Bayshore South Right of Way Infrastructure Improvements Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Sr. Engineer. The Central Bayshore South Right-of-Way Infrastructure Improvement Program is an approximately $18M Design-Build Project located in Miami Beach, Florida. The project limits stretch from Dade Boulevard north to West 34 Street and from Meridian Avenue east to the Indian Creek waterway. The project includes the reconstruction and elevation of roadways within the project area, driveway and swale harmonization, a new stormwater collection, conveyance, treatment, and pump station system, new transmission and distribution watermains, a new multi-use bike/pedestrian path, improved street lighting, improved roadway signage and pavement markings, and appropriate landscape mitigation. Cost: $18 million; Fee: $1,150,280 c. (1) TITLE AND LOCATION (City and State) South Pointe Phase III/IV/V - Right-of-Way Improvement Project Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Engineer, Mr. McClair provided engineering support during the planning and design phases of this infrastructure improvement project. CMA was the prime consultant and was responsible for providing surveying, planning, geotechnical investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and inspection services for infrastructure improvements within the public right of way areas of the South Pointe III/IV/V neighborhood of Miami Beach. The project encompasses approximately 19,000 LF of ROW infrastructure improvements including 9,300 LF 8" water main replacements, stormwater drainage improvements, paving & grading, streetscaping enhancements, landscaping improvements, lighting improvements, and roadway reconstruction. Cost: $10.5 million; Fee: $2,305,354.06 d. (1) TITLE AND LOCATION (City and State) Sunset Islands I & II Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Sr. Engineer. CMA was the prime consultant responsible for planning, design, permitting, bid and award and construction engineering and services for infrastructure improvements within the public right of way areas of the Sunset Islands I & II neighborhood of Miami Beach. The project encompasses ±11,000 LF of ROW infrastructure improvements including 10,900 LF of 8-inch water main replacements, stormwater drainage improvements, paving & grading, traffic pavement marking and signing related enhancements and roadway reconstruction. Cost: $5.6 million; Fee: $322,623 e. (1) TITLE AND LOCATION (City and State) Aviation Blvd Roadway & Hardscape Improvements Marathon, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES ongoing CONSTRUCTION (If applicable) ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Sr. Engineer. CMA will assist in the preparation of roadway and hardscape plans for over two miles of Aviation Boulevard including a segment of 107th Street which is adjacent to the regional airport in the City of Marathon. The project considers the shift of the existing roadway centerline to accommodate a shared 8’ shared path that includes specialty lighting, hardscape elements including benches, pavers and landscaping at various areas along the road. Traffic calming elements including speed humps are being implemented. The project also includes geometric modifications to the roadway along with considerations for existing utilities and stormwater. Fee: $113,500 STANDARD FORM 330 (REV. 8/2016) PAGE 2 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) Miami Beach Sunset Islands 3 & 4 ROW Improvement Program Miami Beach, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami Beach b. POINT OF CONTACT NAME Rene Castillo, Sr. c. POINT OF CONTACT TELEPHONE NUMBER (954) 426-1042 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Chen Moore and Associates provided civil engineering and landscape architecture for the utility infrastructure and roadway reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The project was publicly bid as a design-build and funded by the City of Miami Beach. It required coordination with various agencies including the City of Miami Beach, the Miami-Dade Water and Sewer Department, the Miami-Dade Public Works Department, the Miami-Dade Regulatory and Economic Resources Department and others. The project consists of the replacement of 8" potable water mains, the lining of existing sanitary sewer mains, a completely new storm water drainage system, including discharge pumps and outfalls, the undergrounding of all existing overhead utilities, new service connections to all properties, complete roadway reconstruction and grading with new pavement section and curb, landscaping, signage and striping. A presentation of the technical components and lessons learned from this project was provided at the December 2017 Conference of the Florida Stormwater Association. Cost $7.75 million; Fee: $505,953.76 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Chen Moore and Associates (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Subconsultant – Civil Engineering b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) Central Bayshore South Right of Way Infrastructure Improvements Miami Beach, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 2020 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami Beach b. POINT OF CONTACT NAME Rene Castillo, Sr. c. POINT OF CONTACT TELEPHONE NUMBER (954) 426-1042 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Central Bayshore South Right-of-Way Infrastructure Improvement Program is an approximately $18M Design-Build Project located in Miami Beach, Florida. The project limits stretch from Dade Boulevard north to West 34 Street and from Meridian Avenue east to the Indian Creek waterway. The project includes the reconstruction and elevation of roadways within the project area, driveway and swale harmonization, a new stormwater collection, conveyance, treatment, and pump station system, new transmission and distribution watermains, a new multi- use bike/pedestrian path, improved street lighting, improved roadway signage and pavement markings, and appropriate landscape mitigation. In total, the project proposes approximately 10,000 linear feet of water main ranging from 6” to 16” and approximately 13,600 LF of new roadway. The proposed stormwater system serving approximately 82 acres includes gravity lines throughout the neighborhood ranging from 18” to 72”, a vortex water quality treatment unit, one new pump station to be manifolded with two existing pump station, a 42” stormwater force main, an energy dissipater box, and a new outfall at the Indian Creek waterway. The system is equipped with backflow prevention devices in anticipation of sea level rise. Cost: $18 million; Fee: $1,150,280 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Chen Moore and Associates (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Subconsultant – Civil Engineering b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) South Pointe Phase III/IV/V - Right-of-Way Improvement Project Miami Beach, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2012 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami Beach b. POINT OF CONTACT NAME Carla Dixon c. POINT OF CONTACT TELEPHONE NUMBER (305) 673-7000 ext. 6264 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Chen Moore and Associates was the prime consultant and was responsible for providing surveying, planning, geotechnical investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and inspection services for infrastructure improvements within the public right of way areas of the South Pointe III/IV/V neighborhood of Miami Beach. The project encompasses approximately 19,000 LF of ROW infrastructure improvements including 9,300 LF 8" water main replacements, stormwater drainage improvements, paving & grading, streetscaping enhancements, landscaping improvements, lighting improvements, and roadway reconstruction. Additionally, due to existing listed contaminated sites within the proximity of the right of way improvements, environmental coordination including contaminated sites analysis and consideration of the radius of influence was necessary for coordinating dewatering operations. Due to the existing mixed residential and commercial environment of this neighborhood, special design efforts were made to incorporate walkable community elements including meeting all ADA requirements, providing street furniture, providing bicycle paths, upgrading sidewalks, incorporating specialty treatments at crosswalks, landscaping improvements with specialized tree wells to provide a walkable surface and bulb outs to increase pedestrian friendliness and safety. This project also required extensive coordination with the public, adjacent CRAs, historic districts and various regulatory agencies. As part of the proposed stormwater and drainage services, extensive analysis was conducted utilizing ICPR Modeling and GIS to meet and/or exceed required stormwater Level of Services standards. ICPR Modeling was utilized for the design and permitting of 21 drainage gravity wells and one drainage pump station. The proposed stormwater design included the introduction of catch basins, and stormwater piping to effectively collect and route the stormwater to 16 drainage gravity wells and stormwater pump station with overflow outfall connections to Biscayne Bay. Due to the environmental sensitivity of Biscayne Bay, design and implementation of water quality treatment measures was an important consideration and design factor of the system prior to outfall to the Bay and was closely coordinated with regulatory agencies during the permitting process. Cost: $10.5 million; Fee: $2,305,354.06 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Chen Moore and Associates (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime – Civil Engineering b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) Euclid Streetscape Improvements (Lincoln Center Building) Miami Beach, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2015 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER R & O Studio LLC b. POINT OF CONTACT NAME Omar Moreno c. POINT OF CONTACT TELEPHONE NUMBER (305) 741-4220 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Chen Moore and Associates provided civil engineering and landscape architecture services for the pedestrianizing of Euclid Avenue between Lincoln Road and Lincoln Lane in the City of Miami Beach. This stretch of road will be incorporated into the historic pedestrian street known as Lincoln Road Mall. The project is funded by the City of Miami Beach through a developer’s agreement with Lincoln Center Associates which owns the retail building at the intersection of Euclid Avenue with Lincoln Road. The project requires coordination with various agencies including the City of Miami Beach Planning Department, Public Works, Greenspace management, and Capital Improvements, as well as Miami-Dade County Environmental Protection, Traffic, and Utilities. The scope of work includes providing site design and permitting including layout, hardscape, landscaping, lighting, drainage, and utilities. Cost: $502,000; Fee: $60,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Chen Moore and Associates (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Subconsultant – Landscape Architecture b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) Vida at The Point Aventura, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER GD Capital Development LLC b. POINT OF CONTACT NAME Wesley Kean c. POINT OF CONTACT TELEPHONE NUMBER 305-865-9911 ext102 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Vida at the Point is a luxury waterfront townhome development in Aventura. CMA provided landscape architecture and civil engineering for the project. Fee: $53,380 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Chen Moore and Associates (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Subconsultant – Landscape Architecture b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Gregory Mendez, P.E. Civil Engineering Project Manager X X X X Jose Acosta, P.E., F.ASCE Principal-in-Charge X X X X X Peter Moore, P.E., F.ASCE, ENV SP, LEED AP QA/QC X X X X X Patrick Kaimrajh, P.E. Sr. Engineer X X X X X Jason McClair, P.E., CFM, LEED AP Sr. Engineer X X X X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (From Section F) NO. TITLE OF EXAMPLE PROJECT (From Section F) 1 Miami Beach Sunset Islands 3 & 4 ROW Improvement Program 6 2 Central Bayshore South Right of Way Infrastructure Improvements 7 3 South Pointe Phase III/IV/V - Right-of-Way Improvement Project 8 4 Euclid Streetscape Improvements (Lincoln Center Building) 9 5 Vida at The Point 10 STANDARD FORM 330 (REV. 8/2016) PAGE 4 St a t e o f Fl o r i d a B o a r d o f P r o f e s s i o n a l E n g i n e e r s A t t e s t s t h a t G r e g o r y A. M e n d e z , P . E . A FB P E 1T ] I ’ ’ I s l i c e n s e d a s a P r o f e s s i o n a l E n g i n e e r u n d e r C h a p t e r 47 1 , F l o r i d a S t a t u t e s E x p i r a t i o n : 2 / 2 8 / 2 0 1 9 P . E . L i e . N o : A u d i t N o : 22 8 2 0 1 9 2 0 4 9 9 R VJ ’ . 64 7 1 8 Stotc of floridoBoord of Profcssionol Enginccrs2639 North Monroc Strcct, Suitc &ll2Tollohoscec, FL 32æl-5268JasonJames McClait5OO SøEST CYPRESS CREEK ROAI)SUITE 630FORT LAUDERDALE, FL 33309 I{OTICEIìBPE no longer requires that continuing educationbc rcportcd by thc proviclcr. Instcad liccnsccs rvill bcsubiect to â random audit no tnore thân every four (4)ycars. If you arc sclcctcd for thc ranclom audit, I'oumust ptor.ide verifìcation r¡f one (1) hour of lìloridalarvs and rulcs, onc (1) hour of profcssional cthics,fcrur (4) hours of tLrea of practice and rwelrre (12) hoursin an1'topic pcrtaining to thc practicc of cnginccting,all taken prior to lìebruaty 28, 2017 . (See s. 47I .01'7 ,Irl. Stat.) An1,6p hours takcn aftcr lìcbruary 28,2017rvill result in a fì100 delinquent fee and ¡'our licensebcing placcd in a dclinqucnt status until thc additionalfee is paid,State of FloridaBoard of Ptofessional EngineersAttests thatJasonJames McClait, P.E.' |i rrt'rIo llccn¡ed s¡ a Profcæionel Bnglnoer undc¡ Cb¡Plet 471, F¡odd. St¿iutGBgxptt¡do¡:2/28/2019 P.E.Uc.No:^udrNo:228201924131 56962 State of Florida Board of Professional Engineers Is licensed as a Professional Engineer r¡ndet Chaptet 471' Florida Statutes Expiration:2/28/2019 P'E' Lic' No: Audit No: 228207s24737 R 56962 Attests that lason Jarnês McClair , P.F'. F r4[þF. r I ()l{l')\ ll()\fìll()l¡!r rt I \\( )\ \1 l \( l\l i x\A St a t e o f Fl o r i d a B o a r d o f P r o f e s s i o n a l E n g i n e e r s A t t e s t s t h a t J o s e L u i s A c o s t a , P . E . A lI ’ I T L r U : : . : : — I I I I I I I I I s l i c e n s e d a s a P r o f e s s i o n a l E n g i n e e r u n d e r C h a p t e r 47 1 , F l o r i d a S t a t u t e s E x p i r a t i o n : 2 / 2 8 / 2 0 1 9 P . E . L i c . N o : A u d i t N o : 22 8 2 0 1 9 1 4 3 9 8 R 6 3 8 2 7 St a t e o f Fl o r i d a B o a r d o f P r o f e s s i o n a l E n g i n e e r s A t t e s t s t h a t P a t r i c k D a v e n d r a K a i m r a j h ,P.E.A FBPE . I I i r ri’ I s l i c e n s e d a s a P r o f e s s i o n a l E n g i n e e r u n d e r C h a p t e r 471,Florida Statutes E x p i r a t i o n : 2 / 2 8 / 2 0 1 9 P.E.Lic.No: A u d i t N o : 22 8 2 0 1 9 1 8 2 1 0 R 78535 Stotc of floridoBoord of Profcssionol Enginccrs2639 No¡th Monroc Strcct, Suitc &ll2Tolloho¡scc, îL 3230.t-5268Peter Michael Moote5OO STEST CYPRESS CREEK ROADSUITE 630FT. LAUDERDATE, FL 333090000 NOTICEITBPII no lon¡4er requires that continuing educationbc rcportccl l¡)' thc proviclcr. Instcacl liccnsccs will bcsubiect to â random audit no rnore than ever,v four (4))¡cârs. If )¡ou ârc sclcctcd for thc random auclit, 1'eLÌmust pror.ide \.erificâtion of one (1) hout <>f liloridalarvs ancl tulcs, onc (1) hour of profcssional cthics,four (4) hours of area <tf practice and twelve (12) hoursin anl' topic pcrtâining to thc practicc of cnginccling,all taken prior to liebtuarl' 28,201'7 . (See s. 471,.01'7,lrl. Stat.) Any Cli hours talicn aftcr Fcbrua4'28,201'7rvill result in a $100 delincluent fee and )'our licensebcing placc<l in a clclinqucnt status until thc addidonalfee is paid.State of FloridaBoard of Professional EngineersAttests thatPetet Michael Moote , P.E.âinlrl¡ licensed a¡ a Profcaelonal Englnoct undar Ch¡Ptet 471, Flotld¡ St¿tutcsExpttr{oÃt 2/28 /2019^udlr No: 2200t929457 Pß. Uc. No:58709 State of Florida Board of Profession^l Engineers Is licensed as a Professional Enginees u¡rdef Chapter 471, ßlotida Statutes Attests that Peter Michael Moore , P.E. I | ()t(il)\ lì()\tìl){): l'lì( rl i ¡\l( )\ \l I \{,l\l ¡ iì\A il - 'i Þ B Þil- - ir i ¡$ [- P.E. Lic. No: 58709 Expitation: 2/28/2079 Audit No: 228201929457 R Nutting Engineers – 330 Forms Richard C. Wohlfarth, P.E.Dir. of Engineering/ Principal-In-Charge 28 23 Nutting Engineers of Florida, Inc., Miami, Florida University of Florida - B.S. Civil Engineering Florida Professional Engineer #50858 Registered Building Inspector BN #3580 SBCCI #6528 ACI Level 1, UBCI Florida Engineering Society- Past Chapter President, National Society of Professional Engineers, Treasure Coast Builders Association, American Red Cross First Aid & CPR Certification Hugh Taylor Birch State Park, Fort Lauderdale 2016 Performed geotechncial exploration/engineering for the construction of a new sheet pile seawall structure due west (seaward) of the existing seawall along the western side of the park (Intracoastal Waterway). The new seawall system will consist of approximately 2,600 linear feet of steel sheet piles. In addition to the new seawall system a new dock will be constructed at the southern end of the new seawall system. Beach Sand Classification, Surfside 2017 Performed soil classification and description of the proposed excavated soils to determine if these soils are beach sand compatible. Soil samples of the proposed excavated soils were required to be classified per DEP criteria, to determine if the material is beach sand compatible per DEP specifications. Florida Keys Aqueduct Authority, Various Projects 1995 ongoing Key Largo WWTP, Conch Key WWTP, Layton Key Waste Water and Water Line Installation, Islamorada Pump Station and the Distribution System Upgrades along US-1. Construction of waste water treatment plants, water and wastewater line installations, pump stations and distribution system upgrades in Monroe County. Geotechnical engineering/exploration services and construction materials testing services. City of Key West, Various Projects ongoing ongoing Performed geotechnical exploration/engineering and/or full scope of construction materials testing services for City of Key West Class 1 Solid Waste Transfer Station, Rockland Key, MM 9; proposed pump assisted drainage wells and underground storm water pump station, Duval Street; City of Key West George Street Drainage Basin Improvements. South Florida Water Management District, Multiple Counties ongoing ongoing Recent projects include the G-87 replacement, the G-13 culvert replacement and the G-103 Weir replacement with gates. Gates and culvert replacements in Miami-Dade, Broward, Palm Beach and Osceola County. Qualification based continuing contract since 2007 for geotechnical engineering, construction materials testing , special inspection services. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 15. FIRM NAME AND LOCATION (City and State) 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS STANDARD FORM 330 PAGE 1(REV. 3/2013) a. b. c. d. e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm Scott Ersland Geotechnical Services Manager 19 15 Nutting Engineers of Florida, Inc., Miami, Florida University of Wisconsin Eau Claire, Wisconsin Palm Beach Community College, West Palm Beach Rochester Community College, Minnesota NIOSH 582 Sampling and Evaluating Airborne Asbestos Dust Training; Asbestos Abatement Contractor/ Supervisor Training Course (40 hours); State of Minn. Department of Health Asbestos Abatement Site Supervisor; OSHA training for Hazardous Waste Operations and Emergency Response; Annual 8-Hour OSHA State of Florida Water Well Contractor #11110; The National Groundwater Association Yacht Management Marina, Fort Lauderdale 2018 Performed geotechnical exploration/engineering for the proposed construction of a new, ~4,000 square foot building as well as a new roadway. Little Palm Island Resort and Spa, Little Torch Key 2018 Performed geotechnical exploration/engineering services for the construction of new two-story bungalows, a 2,300 SF multi-function room, and a two-story storage building with 2nd floor work force housing. The original resort substained major damage with many of the structure being destroyed during Hurricane Irma. Sunny Isles Beach Pier, Sunny Isles Beach 2016 Performed geotechnical exploration/engineering services for the expansion of the Sunny Isles Beach pier deck. FKAA Building, ~Mile Marker 49, Marathon 2016 Performed geotechnical exploration/engineering for the planned construction of a new two-story, 6,000 square foot building. Sunset Harbor Seawall Improvements, Stock Island 2014 Performed geotechnical exploration/engineering services for the construction of a new seawall for the canal that borders the residential community E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 15. FIRM NAME AND LOCATION (City and State) 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS STANDARD FORM 330 PAGE 2(REV. 3/2013) a. b. c. d. e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm Hugh Taylor Birch State Park - Proposed Dock and Seawall, Fort Lauderdale 2016 Humiston & Moore Engineers Mr. Matthew Fleming, P.E. 239-594-2021 Nutting Engineers of Florida, Inc. (NE) was retained to perform geotechnical exploration/engineering services for the construction of a new sheet pile seawall structure seaward of the existing seawall along the western side of the park (Intracoastal Waterway). The new seawall system was to be ~2,600 linear feet of steel sheet piles. The sheet piles were proposed to be extended to depths of twenty feet below elevation -1.35 NAVD 88 (approximate low water level). Along with the new seawall system a new dock construction was planned at the southern end of the new seawall system. The dock was designed to be supported using concrete precast driven piles. As part of the geotechnical exploration/ engineering services NE performed ten standard penetration test borings (SPTs) to a depth ranging from 20 foot to 40 foot deep along the seawall and proposed dock area, as well as laboratory testing (Sieve Analysis) in the area of the proposed construction. Nutting Engineers of Florida, Inc. Boynton Beach, Florida Geotechnical Services Firm- full scope of services 1 20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 PAGE 3(REV. 3/2013) a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE Multiple Projects, South Florida Water Management District, Multiple Locations ongoing ongoing SFWMD Mr. Jose Guardardio 561-682-2594 In 2009, NEF was awarded a qualification based continuing contract with the South Florida Water Management District for Phase I/II environmental assessment services and other various environmental services, geotechnical engineering and construction material testing services. Projects include: C-100A Canal Rehabilitation Project Phase I and II - Broward County, 2013 - 2015 Performed geotechnical engineering/ evaluation of canal banks for better flow and water quality. Stormwater Treatment Area (STA-1W) - West of A. Marshall Wildlife Refuge, Palm Beach, 2011 Performed geotechnical exploratory services and various permeability testing to collect level data to help determine the condition of the L-7 Levee relative to the seepage observed through and under the levee. G-103 Weir Replacement, Lake Kissimmee State Park, Kissimmee, 2010 Performed geotechnical exploratory services for the replacement of the existing flood control structure with a new box culvert along with a weir and gates to regulate the flow of water. G-87 Gate Replacement, Canal at SWC of Flamingo Drive and Sheridan Street, Broward County, 2009 Performed geotechnical exploratory and construction materials testing services for the replacement of existing gate with a stainless steel gate. Additional projects include: • S-124 Culvert Replacement and Automation, Markham Park, Sunrise • G-136 Culvert Replacement at juncture of L-1 and L-2 Canals, Hendry County • Building B47 Replacement, Miami • Canal C-100A Phase II at SW 87th Avenue to SW 136th Street/Howard Drive, Miami • S-48 Pump Station Repairs at SW Murphy Road and SW Island Way, Stuart • S-50 Pump Station Repairs at Rosarita Avenue East of North 16th Court, Fort Pierce • S - 13 Repowering and Automation at C-11 Canal at State Road 7, Davie • Canal C-100A at SW 168th Street and Old Cutler Road, Palmetto Bay • S-46 Rehabilitation and Improvement Project at NWC of Island Way and Indiantown Road (S.R. 706), Jupiter • S-125 Culvert Replacement, Davie Nutting Engineers of Florida, Inc. Miami, Boynton Beach, St. Lucie, Florida Geotechnical Services Firm- full scope of services 2 20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 PAGE 4(REV. 3/2013) a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE Florida Keys Aqueduct Authority, Monroe County, Florida - Numerous Projects 1995 - ongoing ongoing Florida Key Aqueduct Authority Mr. Ray Shimokubo/Mr. Tom Walker, P.E. 305-296-2454 Nutting has been providing geotechnical engineering and construction materials testing services to the Florida Keys Aqueduct Authority for over 20 years. Projects include: Distribution Pump Station Directional Drilling @ 18 Mile Stretch Cross Key Pump Station Tower Key Largo Maintenance Building Ocean Reef Distribution System Improvements - Phase II Main R.O. Warehouse Rockland Key Property (Site I & II) North Crawl Key Ocean Reef Vacuum/Pump Station Key Largo Pump Station Key Largo WWTP Duck Key Waste Water and Water Line Conch Key WWTP Layton Key Waste Water and Water Line Installations Distribution System Upgrades along US-1 Islamorada Pump Station Projects via consultants include: FKAA J. Robert Dean Water Treatment Plant, Florida City FKAA - Eden Pines and Pine Channel Estates, Big Pine Key FKAA Outer Islands, Big Pine Key, Ramrod Key, Little Torch Key, Lower Sugarloaf Key FKAA - Cudjoe Key Waste Water Collection System, Lower Sugar Loaf Pump Station FKAA-Key Haven Utility Improvements FKAA Force Main, Boca Chica FKAA Building, 615 33rd Gulf, Marathon Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm- full scope of services 3 20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 PAGE 5(REV. 3/2013) a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE City of Key West, Florida - Key West Improvement Projects, Multiple Locations 2012 City of Key West c/o CH2M Hill Mr. Sean McCoy 305-294-1645 The scope for this project included performing twelve standard penetration test borings (SPT's) to a depth ranging from 43 foot to 120 foot deep at five (5) locations of proposed improvements throughout Key West. Many of these borings were performed utilizing a spud barge with four hydraulic leveling legs/feet, which were lowered to the bay bottom elevating the barge a few feet above the water line. This eliminates the up and down action created by boat wakes and tidal influences. Each waterside boring location was properly abandoned utilizing neat grout slurry. 1) Mallory Square T-Pier: Proposed installation of a new berthing dolphin at the north end of the existing T-Pier structure. Performed waterside borings at this location. 2) Zero Duvall Seawall at the terminus of Duval Street: A new sheet pile wall/bulkhead will be constructed outside of the existing wall bulkhead structure (54') and large stormwater outfall penetration. In addition, the small building, dock and sun screen will be moved and reinstalled in the same location as previous. Performed land and waterside borings at this location. 3) Ferry Terminal Dock Extension at the Key West Ferry Terminal: Construction of a ~121' extension to the existing dock. Performed waterside borings at this location. 4) Ferry Terminal Floating Dock at the Key West Ferry Terminal: Construction of a new floating dock system along 204' of the waterside on Trumbo Road with 50' extensions. Performed waterside borings at this location. 5) Tarpon Pier, Garrison Bight: Replacement of the existing 400' long Tarpon Pier at the Garrison Bridge. Performed waterside borings at this location. Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm - full scope of services 4 20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 PAGE 6(REV. 3/2013) a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table.26. NAMES OF KEY PERSONNEL 27. ROLE IN THIS CONTRACT Place "X" under project key number for participation in same or similar role.)(From Section E, Block 12) (From Section E, Block 13) 12345678910 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 6 2 7 3 8 4 9 5 10 STANDARD FORM 330 PAGE 7(REV. 3/2013) Richard Wohlfarth, PE Main Point of Contact Scott Ersland Geotechnical Serv. Mgr. Hugh Taylor Birch State Park, Fort Lauderdale South Florida Water Management District, Multiple Projects Florida Keys Aqueduct Auth., Monroe County, Multiple Projects City of Key West - Key West Improvement Projects Florida Corporate and Engineering Licenses Occupational Licenses Municipality NUTTING ENGINEERS OF FLORIDA, INC. has been one of the premier geotechnical engineering firms in South Florida since its inception in 1967. Prior to this date work was performed under the name Nutting Engineers, Inc., which originated in 1956 preceded by H.C. Nutting in Miami from 1932 until 1956. NUTTING’s comprehensive range of services include geotechnical exploration and engineering including soil borings and groundwater well drilling, monitoring of pile installation, groundwork modification and chemical grouting procedures, quality control/ quality assurance testing of construction materials, structural inspections (special/threshold) of structures. Project types include airports, seaports, roadways (improvements, widening, extensions, lighting, guard rails), bridges, parking lots and garages, drainage systems, city halls and municipal buildings, parks, recreational facilities, hospitals, educational facilities (K-12 and higher educational facilities) including auditoriums, stadiums/ sports facilities, water and wastewater treatment plants, water storage facilities, courthouses, industrial parks, mining operations, shopping centers, residential communities, hotels, assisted-living facilities, high-rise condominiums and office towers, and communication towers. SERVICES GEOTECHNICAL EXPLORATION AND ENGINEERING: NUTTING’S geotechnical exploration and engineering services include site explorations, sample analysis, site and foundation recommendations, site feasibility, ground modification recommendations, large scale geological survey programs, utilization of outcroppings of subsurface materials, resistivity testing, and geophysical techniques such as ground penetrating radar, soil borings, monitoring well installation and seismographic equipment utilization. Drillers (5) are trained and certified to perform geotechnical drilling services in accordance with the South Florida Water Management District (SFWMD) and the Florida Department of Transportation (FDOT) standards. The NUTTING fleet includes four (4) company owned soil and rock drilling rigs, including Mobile B-57 and B- 59 drill rigs, and portable tripod equipment. Geotechnical exploration services include: Monitoring services include: Fill and demucking operations Pile load test & load bearing tests Vibroflotation & vibro replacement (stone columns) Footing preparation Deep dynamic compaction Precast yard Cementious and chemical grouting Fire proofing Standard penetration test borings Rock coring Installation and monitoring of monitor wells Power/manual auger borings Double ring infiltration tests Ground Penetrating Radar (G.P.R) Undisturbed sampling (Shelby tube samples) Well abandonment Roadway soil survey Structure investigation Percolation tests for exfiltration and Septic systems- SFWMD & FDOT Professional Qualifications of the Firm Professional Qualifications of the Firm Piling installation - driven and auger cast piles Vibration monitoring (seismograph) Temporary & permanent excavation shoring techniques Test pits CONSTRUCTION MATERIAL TESTING SERVICES: Construction materials quality control testing of soil, concrete, asphalt, grout and mortar is performed by field technicians (~20 company wide) with certifications and training through the Construction Training Qualification Program (CTQP), ACI, Masonry Inspectors, Florida Building Codes and Standards, FDOT, Troxler Nuclear and SFWMD. Field-testing services include: LABORATORY SERVICES/ SPECIALTY CERTIFICATIONS: NUTTING’S fully equipped laboratories is accredited by the Construction Materials Engineering Council (CMEC), American Association of State Highway and Transportation Officials (AASHTO) and/or the Florida Department of Transportation (FDOT). Each laboratory and its technicians are held to the same standards, therefore strengthening our commitment to our clients by guaranteeing accurate test results with routinely calibrated and tested equipment. Our Laboratory Manager has undergone intense training and has multiple certifications through these same organizations (AASHTO, CMEC, and FDOT) as well as the Construction Training Qualification Program (CTQP). He is therefore qualified to perform and oversee the lab personnel (3 lab techs) perform a wide variety of laboratory testing services. ENVIRONMENTAL SERVICES: Nutting Engineers of Florida, Inc. has a sister company, Nutting Environmental 0f Florida, Inc. that has performed a wide variety of environmental consulting services throughout Florida for thousands of clients in both private and public sectors since it was formed 1987 to address the growing needs of the client base of Nutting Engineers of Florida, Inc. Environmental services include: Soil density by nuclear gauge Precast plant testing and inspection Concrete cylinders, slump, air content tests Structural concrete coring Masonry grout prism tests Load testing of structural members Pile grout cube tests In-situ pressure testing and pump testing Asphaltic concrete coring and thickness tests HRS soil profiles for septic systems Windsor probe & Swiss hammer tests-concrete Roof fastener pull test Pachometer testing (re-steel location, size) Floor flatness testing Phase I/II Environmental Site Assessments Contamination Assessment Activities Transaction Screening Process Interim Source Removal Activities (ISR) Hydrogeologic Evaluations Assistance with Dewatering Permitting Storage Tank Removal & Closure Assessments Vapor Intrusion Studies Groundwater Monitoring for Solid Waste and HazMat Permit Requirements Peer Review of ESA Reports for Financial Institutions and Other Clients Design & Implementation of Remedial Action Plans (RAP) Biscayne Engineering – 330 Forms 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Michael Bartholomew, PSM Biscayne Engineering Company, Inc. - 529 West Flagler Street, Miami, FL 33130 Associate of Technical Arts, Everett Community College Everett, WA Member of Florida Surveying and Mapping Society (FSMS) Microsoft Certified Professional Title: Expert Witness of Various Continuing Expert Witness Jobs. Location: City of Hialeah, Florida Michael Bartholomew has acted as the City's surveyor, reviewing all plats submitted to the City of Hialeah for compliance with Chapter 177, Florida Statutes, continuously since 1999. In addition to reviewing the plats, Mr. Bartholomew works closely with the City's legal department, providing a wide array of Professional Survey Services. Project consists of Boundary Verification, Field Lay-out of up to 220 Piles, As-Built measurements of up to 220 piles, Topographic Survey and Boundary. Site Located: 419 Michigan Avenue. Cost: $23K Project consists of initial Boundary Survey, Topographic Survey, Tentative Plat, and Final Plat preparation for City of Miami & Miami-Dade County review and approval. Site Located: Between NW 1 Avenue & NE 2 Ave. and NW 8 St. & NW 9 St. Cost: $50K. Project consisted of an As-Built survey of 24 structure’s elevations in North American Vertical DAtum of 1988. Establish NAVD 88 elevations, record survey's field work of 24 sites,preliminary surveyor's report of all sites and final surveyor's report, QA/QC completed, all sites. cost: $40k. Title: Executive Manager Location: South Beach Construction, Miami Beach, FL Title: Executive Manager Location:Various State Roads for FDOT District 6, Miami Florida Title: Executive Manager Location:Lyric Subdivision, Miami, Florida Title: Executive Manager Location: S.F.W.M.D. (Big Cypress Basin) Naples, Florida. Professional Surveyor and Mapper License No. 5666 Project Manager 31 28 4 4 4 4 4 1999 - Present N/A 2016 - Present N/A Present N/A11/2013-01/2016 N/A04/2016 to 10/2016 N/A Recon and Locate R/W Monument Section Corners. Performed GPS Survey, Horizontal Traverse and analyze Survey Right-of-Way Monumentations in conjunction with Record Data. Site Location: Miami, Florida. Cost: $1.5M. 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Luis Gaztambide, PSM Biscayne Engineering Company, Inc. - Miami, Florida BS - Land Surveying and Mapping MS- Geomatics Engineering This project consisted of providing an ALTA/NSPS Land Title Survey and thirteen (13) Elevation Certificates at The Lakes at Deerfield Apartments. Cost: ±17,767.50. Size: 14.2 acres Oversaw and supervised the survey services, which included: field and office staff and procedures employed in the project to establish the baseline of survey and Right of Way for Palmetto Park Road and Lake Worth drainage District L- 48 Canal. Cost: ±$145,450.84. Size: 7 miles Title: Project Manager Location: N. 14 Avenue, from Atlantic Shore Boulevard to Sheridan Street Title: Project Manager Location: The Lakes at Deerfield Apartments, Deerfield Beach, Florida Title: Project Manager Location: S.F.W.M.D. (Big Cypress Basin) Naples, Florida Title: Project Manager Location: Palmeto Park Road, Palm Beach County Florida - Professional Surveyor & Mapper Puerto Rico (PR) - Professional Land Surveyor 4 4 4 4 4 2017 N/A 2016-2017 N/A 2016 N/A2016 N/A2015 to 2016 N/A -Florida Surveying and Mapping Society (FSMS) - Member of Palm Beach Chapter (2008-Present) -Association of Engineers and Surveyor of Puerto Rico Title: Project Manager - QA/QC Manager Location: All Aboard Florida - Miami Station - Track Slabs at D Block This Project consisted of providing miscellaneous Construction Surveying services at All Aboard Florida – Miami Station – Track slabs at block D and verification of platform elevations. ±11,422.50 Size: 1 city block Preparation of Topographic, DTM, Drainage Survey and PNC sheets; prepared, reviewed, research and calculation to establish baseline of survey and R/W lines of N 14th Avenue, Polk Street and Johnson Street; QA/QC of all deliverable files and reviewed final package prior to submittal. Cost: 200,409.98 Size: 4 miles The project consists of an As-Built of 24 structure’s elevations in North American Vertical Datum of 1988. Establish NAVD 88 Elevations, Record Survey’s Field Work of 24 sites, Preliminary Surveyor’s Report of all sites and Final Sur- veyor’s Report, QA/QC Completed, All Sites. Cost: ±29,147.60. Size: 24 Control Structures. QA/QC Manager 22 3 years 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm X. Antonio Negrin, PSM Biscayne Engineering Company, Inc. Novoskibirsk Institute of Engineerings of Geodesy, Photogrammetry and Cartography, Russia AutoCAD MDCC Inter American Campus Microstation – Bentley Institute Surveying required in connection with the Parking Lot Renovation of 3 Parking Lots consisting of the reconstruction of three municipal parking lots including raising the grade of the parking lots and providing new drainage in anticipation of sea level rise. $193K. A multi-section Boundary Survey located in the Southern Glades of Florida. This project consisted of the location and setting of section corners in the Glades utilizing boats and creative surveying methods; in accordance with Florida’s Standards of Practice (SOP) and SFWMD requirements. Title: Production Manager Location: Center Brickell Subdivision, Miami Florida Title: Production Manager. Various State Roads for FDOT District 6, Miami Florida Title: Production Manager Location: Parking Lot Renovation, Miami Beach, Florida Title: Production Manager Location: Southern Glades, SFWMD, Monroe County, Florida. Professional Surveyor and Mapper License No. LS6987 Production Manager 22 11 4 4 4 4 4 2015 - Present N/A 2013 - Present N/A 2013 -2017 N/A2016 N/A03/2016 - 08/2016 N/A Title: Production Manager Location: Miami Beach Convention Center Renovation, Miami Beach, FL Services include Engineering Surveying support to the General Contractor during construction including plans for the construction support compound, multiple maintenance of traffic plans and permitting. Project also includes Construction Layout Surveying and As-Builts. Cost: $246K. Project consists of initial Boundary Survey, Topographic Survey, Tentative Plat Preparation for City of Miami and Miami- Dade County Review, Approval and Final Plat Preparation. Cost: $70K. Recon and Locate R/W Monument Section Corners. Performed GPS Survey, Horizontal Traverse and analyze Survey R/W Monumentations in conjunction with Record Data. Site Location: Miami, Florida. Cost: $1.5M. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) Miami Beach Convention Center - Miami, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Clark Construction Group, LLC b. POINT OF CONTACT NAME Herman Guerra Santos c. POINT OF CONTACT TELEPHONE NUMBER (786)812-7045 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Biscayne Engineering provided Surveying and Mapping Services for the Miami Beach Convention Center and its surrounding lands. Tasks included: Topographic and Boundary Survey of the Miami Beach Convention Center, parking lots, Holocaust Memorial, Botanical Gardens, City Offices except the parking garage(s). Drainage Survey: Convention Center Drive, Meridian Ave, 17th St., 18th St., 19th St. Designated underground utilities: Vacuum excavation Reviewed title search and plot easements HD Scan and Interior Survey inside the Convention Center Performed survey work to aid in the demolition and simultaneous reconstruction of the Convention Center structure while facilitating continued operation of the facility for high profile events such as Art Basel. The total cost for this project is $531,302 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Biscayne Engineering Company, Inc. (2) FIRM LOCATION (City and State) Miami, Florida (3) ROLE Professional Surveying Services / Sub consultants b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) David T. Kennedy Park / Miami, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Miami Capital Improvements b. POINT OF CONTACT NAME Carlos Lozano c. POINT OF CONTACT TELEPHONE NUMBER (305)416-1247 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) This project consisted of a Boundary and Topographic survey of David T. Kennedy Par k, for the City of Miami’s Capital Improvements Department. The City requested existing conditions of the park and elevations on a 10 feet grid, in certain areas, for the purpose of water discharge of existing restrooms on site. In coordination with our certified arborist sub consultant, more than 700 trees were located, identified, and measured. Boundary Survey tasks included were: • Perform a closed horizontal traverse around the perimeter of the Subject Property. • Locate sufficient property corners and centerline control so that a determi- nation can be made as to the location, on the ground, of the boundaries of the Subject Property. • Find or set all property corners along the boundary of the Subject Property. Topographic Survey (Horizontal) tasks included were: • Locate all visible above ground improvements (structures, asphalt, sidewalks, visible above ground utilities, tree locations,etc. within the Subject Property. • Locate the visible, above ground appurtenances to underground utilities (manholes, catch basins, hydrants, utility poles,etc.) within the limits of subject property. • Isolated trees will be located and areas of large clusters of trees, only the outside perimeter of the clusters will be located. Topographic Survey (vertical) Tasks included were: • Perform closed bench level circuit between two (2) published benchmarks and Subject Property. • Obtain Spot Elevations. • Obtain site elevations on a 100’ (+/-) grid within the subject property. • For the purpose of water discharge of existing restrooms on site, elevations will be measured in 10’ intervals along the line provided by the client, and along two lines; 50’ apart from the line provided by the client. Four (4) elevatio ns will be measured in the water, 15’ off shore. • Rim and invert elevation data for drainage or sewer structures will be provided as part of this proposal only within the boundaries of the Subject Property. The total cost for this project was $36,619.60. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Biscayne Engineering Company, Inc. (2) FIRM LOCATION (City and State) Miami, Florida (3) ROLE Professional Surveying Services / Prime b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) TITLE OF EXAMPLE PROJECT (From Section F) G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 1 2 3 4 5 6 7 8 9 10 STANDARD FORM 330 (REV. 8/2016) PAGE 4 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13)1 2 3 4 5 6 7 8 9 10 29. EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT (From Section F)NUMBER 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) Chisholm Architects – 330 Forms 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)16. EDUCATION (DEGREE AND SPECIALIZATION) 15. FIRM NAME AND LOCATION (City and State) a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm STANDARD FORM 330 (REV. 8/2016) PAGE 2 Registered Architect, State of Florida #AR-0007442 1977 - Current Registered Interior Designer, State of Florida #ID-000384 1996 - Current Mr. Chisholm was formerly a member of the Metro Dade County Manager's office in the office of Community & Economic Dev. (OCED) during the 1970's. Mr. Chisholm was lead principal planner in charge of planning and implementation of capital improvement projects in several urban neighborhoods. He dealt directly with members of the Federal, State, County and City governments in planning, funding and implementation of projects. Mr. Chisholm was the founding chairman of the Parks, Everglades, Key Biscayne and Dry Tortuga National Parks Association. Mr. Chisholm brings depth of experience/knowledge in planning & organizing projects to meet intended goals efficiently and effectively. Tamarac Sports Complex was completed as a design/build project for the City of Tamarac. Three new baseball fields with dugouts and bleachers, batting cage with artificial turf, sports field lighting, 5,000 SF concession building with second floor viewing area, kitchen, elevator, two new parking lots, resurfacing of existing lots, new playground with pavilion and safety surface, fishing pier, kiosk, outdoor hockey rink, exercise trail, walking path and concrete paving on a fifteen-acre site. Project Role: Principal in Charge / Cost: $6M This project consisted of the design and construction administration for an 8,000-square foot recreation building inclusive of snack bar, arts and crafts, multi-purpose and game rooms, park manager and staff offices, park equipment storage rooms and toilet room facility. Project scope also includes addition of existing hallway lighting throughout the park and existing parking area photometric studies. Project Role: Principal in Charge / Cost: $1.2M A 20,000SF Community Center Facility including a banquet hall, multi-purpose rooms, gym, as well as an aquatic area with a 25- meter lap pool, splash park locker and changing room facilities. Project Role: Principal in Charge / Cost: $10M This facility is the entry and focal point of Douglas Park. It will be constructed in an environmentally sensitive area (Contaminated) and on structural piles. It will consist of Multi-purpose space, administrative offices, snack bar / kitchen, public restrooms, park maintenance storage space, classroom and crafts spaces, NET office and multi-purpose outdoor courtyard. The project is in building permit phase and will begin construction in early 2018. Project Role: Principal in Charge / Cost: $3.0M Approximately 23-acre park with a new design that includes walking trails, fitness stations, nature kiosk, fishing pier/observation platform, picnic tables, benches, restroom building with storage, landscaping and parking lot. Project Role: Principal in Charge / Cost: $2.5M ON-GOING 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)16. EDUCATION (DEGREE AND SPECIALIZATION) 15. FIRM NAME AND LOCATION (City and State) a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm STANDARD FORM 330 (REV. 8/2016) PAGE 2 Registered Architect, State of Florida #AR-92343 2004 - Current Mr. Polak has served as Project Manager for programming, planning, design, construction docs and construction admin. for a variety of projects in both public and private sector. Specialized experience in new construction, renovations, additions and conversions for several types of facilities including multi- purpose/institutional and medical, housing developments, office buildings, historic structures, airports, restaurants, banks and hotels. Specific project experience is comprised of admin of the technical architectural operations at Chisholm which includes leadership and coordination of all projects. Approximately 23-acre park with a new design that includes walking trails, fitness stations, nature kiosk, fishing pier/ observation platform, picnic tables, benches, restroom building with storage, landscaping and parking lot. Project Role: Project Director / Cost: $2.5M Tamarac Sports Complex was completed as a design/build project for the City of Tamarac. Three new baseball fields with dugouts and bleachers, batting cage with artificial turf, sports field lighting, 5,000 SF concession building with second floor viewing area, kitchen, elevator, two new parking lots, resurfacing of existing lots, new playground with pavilion and safety surface, fishing pier, kiosk, outdoor hockey rink, exercise trail, walking path and concrete paving on a fifteen-acre site. Project Role: Project Director / Cost: $6M This project consisted of the design and construction administration for an 8,000-square foot recreation building inclusive of snack bar, arts and crafts, multi-purpose and game rooms, park manager and staff offices, park equipment storage rooms and toilet room facility. Project scope also includes addition of existing hallway lighting throughout the park and existing parking area photometric studies. Project Role: Project Director / Cost: $1.2M A 20,000SF Community Center Facility including a banquet hall, multi-purpose rooms, gym, as well as an aquatic area with a 25- meter lap pool, splash park locker and changing room facilities. Project Role: Project Director / Cost: $10M This facility is the entry and focal point of Douglas Park. It will be constructed in an environmentally sensitive area (Contaminated) and on structural piles. It will consist of Multi-purpose space, administrative offices, snack bar / kitchen, public restrooms, park maintenance storage space, classroom and crafts spaces, NET office and multi-purpose outdoor courtyard. The project is in building permit phase and will begin construction in early 2018. Project Role: Project Director / Cost: $3.0M ON-GOING F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) STANDARD FORM 330 (REV. 8/2016) PAGE 3 Project Scope & Size: Approximately 23-acre park with a new design that includes walking trails, fitness stations, nature kiosk, fishing pier/observation platform, picnic tables, benches, restroom building with storage, landscaping and parking lot. Project Relevance: R.E. Chisholm Architects services included Planning, Programming and Design, Technical Documents, Construction Management and Construction Administration. Project cost: $2.5M F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) STANDARD FORM 330 (REV. 8/2016) PAGE 3 Project Scope & Size: Tamarac Sports Complex was completed as a design/build project for the City of Tamarac. Three new baseball fields with dugouts and bleachers, batting cage with artificial turf, sports field lighting, 5,000 SF concession building with second floor viewing area, kitchen, elevator, two new parking lots, resurfacing of existing lots, new playground with pavilion and safety surface, fishing pier, kiosk, outdoor hockey rink, exercise trail, walking path and concrete paving on a fifteen-acre site. Project Relevance: R.E. Chisholm Architects services included Planning, Programming and Design, Technical Documents, Construction Management and Construction Administration. Project cost: $6M F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) STANDARD FORM 330 (REV. 8/2016) PAGE 3 Project Scope & Size: This project consisted of the design and construction administration for an 8,000-square foot recreation building inclusive of snack bar, arts and crafts, multi-purpose and game rooms, park manager and staff offices, park equipment storage rooms and toilet room facility. Project scope also includes addition of existing hallway lighting throughout the park and existing parking area photometric studies. Project Relevance: R.E. Chisholm Architects services included Planning, Programming and Design, Technical Documents, Construction Management and Construction Administration. Project cost: $1.2M F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) STANDARD FORM 330 (REV. 8/2016) PAGE 3 Project Scope & Size: A 20,000SF Community Center Facility including a banquet hall, multi-purpose rooms, gym, as well as an aquatic area with a 25-meter lap pool, splash park locker and changing room facilities. Project Relevance: R.E. Chisholm Architects services included Planning, Programming and Design, Technical Documents, Construction Management and Construction Administration. Project cost: $10M F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) STANDARD FORM 330 (REV. 8/2016) PAGE 3 Project Scope & Size: This facility is the entry and focal point of Douglas Park. It will be constructed in an environmentally sensitive area (Contaminated) and on structural piles. It will consist of Multi-purpose space, administrative offices, snack bar / kitchen, public restrooms, park maintenance storage space, classroom and crafts spaces, NET office and multi-purpose outdoor courtyard. The project is in building permit phase and will begin construction in early 2018. Project Relevance: R.E. Chisholm Architects services include Planning, Programming and Design, Technical Documents, Construction Management and Construction Administration. Project cost: $3.0M PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) a. SIGNATURE ARCHITECT-ENGINEER QUALIFICATIONS 2a. FIRM (OR BRANCH OFFICE) NAME 2b. STREET 2c. CITY 2d. STATE 2e. ZIP CODE 3. YEAR ESTABLISHED 4. DUNS NUMBER 5. OWNERSHIP b. Discipline c. No. of Employees 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS b. Experience c. Revenue IndexNumber(see below) 1. SOLICITATION NUMBER (If any) 8a. FORMER FIRM NAME(S) (If any)8b. YR. ESTABLISHED 9. EMPLOYEES BY DISCIPLINE Total (1) FIRM (2) BRANCH 1.Less than $100,000 2.$100,00 to less than $250,000 3.$250,000 to less than $500,000 4.$500,000 to less than $1 million 5.$1 million to less than $2 million 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) 7. NAME OF FIRM (If block 2a is a branch office) 6a. POINT OF CONTACT NAME AND TITLE 6c. E-MAIL ADDRESS 8c. DUNS NUMBER a. Federal Work b. Non-Federal Work c. Total Work 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. b. DATE c. NAME AND TITLE a. Function Code a. Profile Code 6b. TELEPHONE NUMBER a. TYPE b. SMALL BUSINESS STATUS PROFESSIONAL SERVICES REVENUE INDEX NUMBER 6.$2 million to less than $5 million 7.$5 million to less than $10 million 8.$10 million to less than $25 million 9.$25 million to less than $50 million 10.$50 million or greater Other Employees AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE 6 15 N/A miamidade.gov Internal Services Department Small Business Development 111 NW 1 Street, 19th Floor Miami, Florida 33128 miamidade.gov T 305-375-3111 F 305-375-3160 March 5, 2018 Robert Chisholm R.E. Chisholm Architects, Inc. 782 NW 42nd Ave Suite #650 Miami, FL 33126 Approval Date: January 31, 2018 - Small Business Enterprise - Architectural & Engineering (SBE - A&E) Expiration Date: January 31, 2021 Dear Robert Chisholm, Miami-Dade County Small Business Development (SBD), a division of the Internal Services Department (ISD) has completed the review of your application and attachments submitted for certification. Your firm is officially certified as a Miami-Dade County Small Business Enterprise - Architectural & Engineering (SBE - A&E). The Small Business Enterprise (SBE) programs are governed by sections 2-8.1.1.1.1; 2-8.1.1.1.2; 2-10.4.01; 10-33.02 of Miami-Dade County’s Codes. This Small Business Enterprise - Architectural & Engineering (SBE - A&E) certification is valid for three years provided that you submit a "Continuing Eligibility Affidavit" on or before your anniversary date, January 31, 2019. The affidavit must indicate any changes or no changes in your firm pertinent to your certification eligibility. The submittal of a "Continuing Eligibility Affidavit" annually with specific supporting documents on or before your Anniversary Date is required to maintain the three-year certification. You will be notified of this responsibility in advance of the Anniversary Date. Failure to comply with the said responsibilities may result in immediate action to decertify the firm. If at any time there is a material change in the firm including, but not limited to, ownership, officers, director, scope of work being performed, daily operations, affiliation(s) with other businesses or the physical location of the firm, you must notify this office in writing within (30) days. Notification should include supporting documentation. You will receive timely instructions from this office as to how you should proceed, if necessary. This letter will be the only approval notification issued for the duration of your firm’s three years’ certification. If the firm attains graduation or becomes ineligible during the three-year certification period, you will be properly notified following an administrative process that your firm’s certification has been removed pursuant to the code. Your firm’s name and tier level will be listed in the directory for all SBE certified firms, which can be accessed through Miami-Dade County’s SBD website: http://www.miamidade.gov/smallbusiness/certification-lists.asp. The categories as listed below affords you the opportunity to bid and participate on contracts with Small Business Enterprise measures. It is strongly recommended that you register your firm as a vendor with Miami-Dade County. To register, you may visit: http://www.miamidade.gov/procurement/vendor-registration.asp. Thank you for your interest in doing business with Miami-Dade County. If you have any questions or concerns, you may contact our office at 305-375-3111 or via email at sbdcert@miamidade.gov. Sincerely, Claudious Thompson, Section Chief Small Business Development CATEGORIES: (Your firm may bid or participate on contracts only under these categories) MDC-TCC 04-02: ARCHITECTURAL DESIGN MDC-TCC 05-02: ARCHITECTURAL DESIGN MDC-TCC 14: ARCHITECTURE MDC-TCC 18: ARCHITECTURAL CONSTRUCTION MANAGEMENT MDC-TCC 21: LAND-USE PLANNING MDC-TCC 22: ADA TITLE II CONSULTANT NAICS 541310: ARCHITECTURAL SERVICES RE Chisholm Architects, Inc. 782 NW 42nd Ave, Suite #650, Miami, FL 33126 Architecture | Planning | Interiors 305.661.2070 F. 305.661.6090 info@chisholmarchitects.com AR0007442 / ID0003684 FIRM PROFILE INTRODUCTION R.E. CHISHOLM ARCHITECTS, INC. is a multi-disciplinary firm located in Miami, Florida. We provide services in architecture, interior design, planning and urban design. The firm is recognized locally and nationally for outstanding design and quality of service. Chisholm Architects has extensive experience in a variety of project types over the last (36) years and its principals over the last forty-three years. These include institutional, corporate, educational, transportation, commercial and housing projects. We have provided the entire range of services including architecture, interior design, construction administration, planning, urban design and feasibility analysis. All of Chisholm Architects activities in the areas of design, documentation, cost estimating, scheduling and specifying are computerized. HISTORY R.E. CHISHOLM ARCHITECTS, INC. was founded in 1982 by Robert E. Chisholm, AIA. The firm was known as CSR Architects from 1983 through 1989. In 1989, the firm was incorporated and grew to its current status. Robert E. Chisholm originally adopted the firm philosophy of maintaining a variety of project types and experience which would develop the thinking and attitude of the firm in a consistent direction of architects in responsible leadership of the project. In 1989, Robert E. Chisholm re-structured the firm and its course towards a comprehensive approach to design and architecture. In 1992, the firm was named “Architectural Firm of the Year” in Dade County and again in 2016. In 1996 Robert E. Chisholm was named Fellow of the American Institute of Architects. The highest honor attainable in this 160-year-old organization. The firm and its principals have received national, state and local awards in architectural design planning, graphics, urban design, and community service; as early as 1976 and as recently as 2017. This, coupled with a focused approach to the highest level of creative and pragmatic service possible with an involvement in a wide variety of project types make up the substance of this firm. THE FIRM R.E. CHISHOLM ARCHITECTS, INC. is a Miami-Dade County Micro/SBE Certified consulting firm providing comprehensive professional services in Architecture, Planning, and Interior Design. Chisholm Architects provides services to clients throughout the United States, South and Central America and the Caribbean. Among the firm’s clients are corporate, municipal, state and federal agencies, public and private institutions and private clients. Chisholm Architects maintains a professional staff of architects, planners, designers and administrative personnel. The firm has had extensive experience in the planning, development, design and construction of prominent commercial, industrial, governmental, institutional, and multi-family residential projects. VISION AND APPROACH TO THE WORK Our corporate philosophy has been to maintain a group of professionals committed to providing creative solutions and services to multiple building and project types. This has allowed our entire staff to apply creative problem -solving experience to any project regardless of scope and complexity. Consistently our firm is considered and selected to provide professional services typically reserved for much larger regional or national design firms. We are able to accomplish this by management of work flow, strategic partnering with other consultants complementing our services and tailoring the services of the entire team to meet the goals and objectives of the client. Today, after many successful years of commitment and dedication, R.E. CHISHOLM ARCHITECTS, INC. continues to provide exceptional design and the highest quality of services possible to our clients. Our emphasis will continue to be the best at what we do. Being exposed to and involved in a wide variety of project types, without a doubt, is what has made our firm so successful. FIRM PROFILE PUBLIC SECTOR CLIENTS STATE/FEDERAL AGENCY • Miami Dade College • Florida International University • State of Florida Board of Regents • South Florida Water Management District • US Department of Agriculture • US Department of Housing and Urban Development • US Department of Veterans Administration • US Army Corps of Engineers • US General Services Administration • US Drug Enforcement Administration • US Department of Homeland Security MIAMI DADE COUNTY • Miami-Dade County Port of Miami • Miami-Dade County Aviation Department • Miami-Dade County GSA • Miami-Dade County Office of Community Development • Miami-Dade County Public Schools • Miami-Dade County Transit Authority • Miami-Dade County Parks and Recreation • Broward County Offices of Capital Improvement MUNICIPALITY • City of Hialeah, Florida • City of Homestead Office of Community Development, Florida • City of Homestead, Florida • City of Miami, Florida • City of Miami Parks and Recreation • City of Miami Police • City of Miami Gardens, Florida • City of South Miami • City of Tamarac, Florida PUBLIC HOUSING AUTHORITY • Broward County North Homeless Assistance Center • City of Hialeah Housing Authority • Fort Pierce Housing Authority • Miami-Dade County Department of Housing and Urban Development • Miami Beach Housing Authority • St. Petersburg Housing Authority FOREIGN GOVERNMENT • The Consul General of Barbados PROJECT TYPES AVIATION FACILITIES CHILDCARE FACILITIES COMMUNITY FACILITIES ELEMENTARY SCHOOLS HOSPITAL FACILITIES HOUSING INFRASTRUCTURE MAINTENANCE FACILITIES MARITIME FACILITIES MULTI-PURPOSE FACILITIES MULTI-UNIT HOUSING MUSEUMS OFFICES PARKS PLAYING FIELDS STADIUM TRANSPORTATION UNIVERSITY FACILITIES URBAN DESIGN URBAN PLANNING FIRM PROFILE PRIVATE SECTOR CLIENTS INSTITUTIONAL • Archdiocese of Miami • Association for Retarded Citizens • Easter Seal Society • Ermita de la Caridad • Gulliver Academy • Gulliver Preparatory • La Salle High School • Temple Israel of Greater Miami • University of Miami CORPORATE • Alamo Rent-a-Car, Inc. • American Bankers Insurance Group • American Equity Property • Americatel Corporation • Bank of America • Banco Popular Dominicano • Burger King Corporation • Chapman Partnership • Chrysler Corporation • CIFO Group • Citgo Corporation • Continental Flowers • EFC Holdings, Inc. • Florida East Coast Industries • Florsheim Corporation • GBS International • Great Florida Bank • Nations Bank • Norwegian Cruise Lines • Ocean Bank • Total Bank • United Parcel Service • Union Planters Bank • US Century Bank MULTI-HOUSING • Advanced Housing Corp. • Affordable Housing Solutions • Centennial Management Corp. • Centro Campesino, Inc. • Chapman Partnership • Everglades Community Assoc. • Greater Miami Neighborhoods Inc. • Jubilee Corporation • Harbor Development Group • Northstar Corporation • Related Housing Companies • Rouse Company • The Enterprise Foundation • The Heritage Corporation • Catholic Housing Management TRANSPORTATION • American Airlines • Arrow Air • Avensa Airlines • Bahamas Air • British Airways • Continental Airlines • Fine Air • Miami-Dade County Office of Transportation • Southern Air • US Air, Inc. • Virgin Atlantic Airways FOOD/BEVERAGE • Burger King Corporation • Cheesecake Factory • La Bodega, USA/Spain • Laposse, USA • Latin American Gourmet • Los Ranchos Restaurants, Inc. ENTERTAINMENT • Baja Beach Club • Coconut Grove Playhouse • The Improv Comedy Club • Paranoia Club MEDICAL FACILITIES • Beacon Health Group • Baptist Health South Florida • Beraja Clinics • Femwell Inc. • Jackson Health Systems • Lawnwood Regional Medical Center HOTELS • Domus Group • Karisma Corp • Worsham Brothers Inc. / Biltmore Hotel PROJECT TYPES AIRLINE FACILITIES AIRLINE OFFICES BANK FACILITIES CHURCHES CLUBS AND ENTERTAINMENT CUSTOMER SERVICE EDUCATIONAL CENTERS FACILITIES SERVICE FACILITIES FEASIBILITY STUDIES FUEL STATIONS MAINTENANCE MEDICAL CENTERS MEDICAL OFFICES MULTI-UNIT HOUSING OFFICE BUILDINGS PLANNING RESTAURANTS / FOOD FACILITIES SATELLITE EARTH STATION THEATERS TRANSPORTATION FACILITIES ZONING FIRM PROFILE AWARDS & RECOGNITIONS CATEGORIES ADVANCEMENT OF THE PROFESSION OF ARCHITECTURE ARCHITECTURAL DESIGN BUSINESS EXCELLENCE IN CONSTRUCTION FIRM OF THE YEAR GRAPHICS AND DESIGN INTERIOR DESIGN URBAN PLANNING URBAN DESIGN SERVICE TO THE COMMUNITY SERVICE TO THE PROFESSION 1997 - Community Service American Institute of Architects; Entrepreneur of the Year Award; South Beach Hispanic Chamber of Commerce 1996 - Robert E. Chisholm elected to The College of Fellows of the American Institute of Architects, Washington, D.C. 1995 - Award of Excellence/ Design; American Institute of Architects CPHI, Center Homeless Assistance; Design & Construction Committee; Robert E. Chisholm, AIA, Chairman, Wolfberg, Alvarez & Partners - Architects of Record. - State of Florida award Chapter American Planning Association; “Moss Plan” Hurricane Recovery Master Plan South Dade County, Florida; Bermello, Ajamil & Partners, Inc. R.E. Chisholm Architects, Inc. 1994 - Mr. Chisholm and RE Chisholm Architects, Inc. were selected as Architect and Architect Firm of the year, by the South Beach Hispanic Chamber of Commerce. 1993 - Presidents Award American Institute of Architects, Miami Chapter - Memorial Chapter Award; American Institute of Architects; State of Florida; Anthony Pullara Award 1992 - Gold Medal Award for Overall Best Product / FAME AWARD South Florida Builders Association; Suchman Residence, Coral Gables, Florida. - Architectural Firm of the Year; Latin- Builders Association Award 1987 - Award of Special Recognition Edward J. DeBartolo Company; Miami International Mall Le Café Limoge. 1981 - Progressive Architecture Urban Design Award of Excellence; Miami Beach Art Deco District Historic Preservation Master Plan; Anderson, Notter, Finegold, Inc. Ramos & Associates, Inc. Local Associated Architects Robert E. Chisholm, FAIA, Principal-in-Charge - Award of Special Recognition; Miami Beach Art Deco District Historic Preservation Master Plan; Florida Chapter of American Planning Association Anderson, Notter, Finegold, Inc. Ramos & Associates, Inc., Local Associated Architects Robert E. Chisholm, FAIA, Principal-in-Charge 1980 - Fourth Place Design Award; American Institute of Architects, Design Competition for AIA Office Headquarters State of Florida, Tallahassee, Ramos and Associates, Inc. Robert E. Chisholm, FAIA 1979 - Award of Excellence Art & Design Honorable Mention; National Association of County Information Officers “Dade County Residential Rehabilitation Program Brochure” 1976 - Honorable Mention “Biscayne West”; National Urban Design Competition; Miami, Florida 2017 - Excellence in Construction, Associated Builders and Construction ABAE Hotel, Miami Beach, FL. Cuesta Construction / Chisholm Architects. 2016 - Platinum Award, Builders Association of South Florida, Florida’s Best Awards, Princeton Grove Village. AHS Development Group, LLC / Chisholm Architects. 2016 - Mr. Chisholm and RE Chisholm Architects, Inc. were selected as Architect and Architect Firm of the year, by the South Florida Hispanic Chamber of Commerce. 2015 - Scholarship by the Goldman-Sachs and Babson College 10,000 Small Business Program to study Advance Business Entrepreneurship. 2011 - Mr. Robert E. Chisholm was inducted into the LaSalle High School Alumni Hall of Fame and the founding class of the La Salle High School Sports Hall of Fame 2010 - Community Partnership for Homeless, Inc. The Robert E. Chisholm FAIA Service Award. First annual award of this type for any individual or corporation for service to the homeless. 2008 - Ronald McDonald House Twelve Good Men Award for Outstanding Community Service and Involvement to Robert E. Chisholm, FAIA, NCARB 2007 - Florida & Caribbean Association of the American Institute of Architects Silver Medal Award for Architecture to Robert E. Chisholm, FAIA, NCARB - Greater Miami Chamber of Commerce Top 100 Minority Business Awards; R.E. Chisholm Architects, Inc. 2006 - March of Dimes Community Excellence Award, Architectural and Engineering - Robert E. Chisholm, FAIA, NCARB - Alvah H. Chapman Jr. Humanitarian Award to Robert E. Chisholm, FAIA, NCARB 2005 - Miami/American Institute of Architects; Silver Medal Award for Architecture Robert E. Chisholm, FAIA, NCARB 2004 - American Institute of Architects; Charles W. Clary Government Service Award - Miami-Dade College Alumni Hall of Fame/Architecture Robert E. Chisholm, FAIA 2002 - Historic Preservation Award; Dade Heritage Trust; Cuchiella Residence Homestead, FL. 1998 - Churrascos Restaurant / Best New Building/Commercial Indian River County Chamber of Commerce Vero Beach, FL. - National Maxwell Award of Excellence for Design Fannie Mae Foundation Fannie Mae Foundation Washington, D.C. Everglades Farmworkers Villages 1995 1981 1993 2004 2007 Cummins | Cederberg 7550 Red Road, Suite 217 ▪ South Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com Tab F: Firm References and Similar Work Completed City of Sunny Isles Beach |Request for Qualifications No. 18-02-01 29 REFERENCE QUESTIONNAIRE It is the responsibility of the consultant to provide a minimum of three (3) different government agency reference other than City of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Bidder) _______________________________________________________________ Firm giving Reference: ____________________________________ _______________________________ Address:___________________________________________ Phone: ___________________________________________ Fax: ______________________________________________ Email: ___________________________________________ 1.Q: What was the title of the contract or job assigned to Bidder? A: 2.Q: What was the scope of work/services assigned to Bidder? A: 3.Q: Have there been any change orders, and if so how many? A: 4.Q: Do they perform on a timely basis as required by the agreement? A: 5.Q: Was the project manager easy to get in contact with? A: 6.Q: Would you use them again? A: 7.Q: Overall, what would you rate their performance? A: 8.Q: Is there anything else we should know, that we have not asked? A: The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free from vendor interference/collusion. Name: _______________________________________ Title _____________________________________________ Sign Name: __________________________________ Date: ___________________________________________ Cumming Cederberg Coastal and Marine Engineering City of Marathon 9805 Overseas Hwy, Marathon FL 33050 305-289-5008 solisc@ci.marathon.fl.us Coco Plum Beach Erosion Control Study Analyze existing condition and erosion issues, and provide alternative to mitigate issues. No Yes Yes Yes Very Good consultant was very knowledgable and provided well documented information easy to understand Carlos A. Solis, P.E.Director of Public Works & Engineering 3-19-18 ATTACHMENT A – SCOPE OF WORK PART 1 – MEETINGS AND PROJECT MANAGEMENT a. Project Management: Cummins Cederberg will provide project management services for the coastal engineering components included under this proposal. This will include: Kick off meeting Project updates Up to Two Project Meetings in Marathon Presentation of results in Marathon PART 2 – DATA COLLECTION Cummins Cederberg will compile available information pertaining to the projects. This may include: Nautical charts Bathymetric data Historical beach profiles Geotechnical data existing sand Marine resource data Historical aerials PART 3 – EROSION STUDY a. Site Visit: A Cummins Cederberg’ coastal engineer will conduct a two (2) day site visit to visually evaluate the coastal processes within the vicinity of the Project site. Specifically, observations will be made of the existing topography and bathymetry in accessible areas, shoreline configuration, sediment transport, wind and wave characteristics. b. Historical Data Review: Cummins Cederberg will review the historical data available to assess potential trends in erosion and accretion patterns. Historical data may include aerials and/or beach profiles. The data will be reviewed relative to longer and shorter terms trends. The performance of historical beach project will be reviewed based on the available data. c. Design Winds and Offshore Waves: Conduct a statistical analysis based on +100-year historical storm and hurricane tracks and available offshore wave data within the Project vicinity in order to determine seasonal and extreme conditions. Cummins Cederberg will utilize an in-house database of offshore wave data throughout the Caribbean in an approximately 25-mile grid. The design winds and design offshore waves for extreme conditions (i.e. 25, 50 and 100-year return periods) will be determined through an extreme probability analysis. The wind and wave analyses will provide the basic information required for wave propagation modeling under Part 1(c). d. Modeling of Wave Propagation: Utilize the state-of-the-art DHI MIKE21 Spectral Wave (SW) numerical wave model to conduct a wave propagation study to evaluate the effects of wave propagation from the offshore region to the nearshore region. The MIKE21 SW numerical wave model is a 3rd generation spectral wind-wave model that simulates the growth, decay, and transformation of wind-generated waves in offshore and coastal areas. e. Sediment Transport Assessment: The wave modeling results obtained will be evaluated along with the shoreline configuration, and bathymetric conditions to determine sediment transport characteristics in the nearshore area. Areas of potential sand deposition and erosion will be identified along with the predominant direction of sediment transport patterns in the Project vicinity. These estimates will be used for the subsequent design of beach and potential coastal structures. f. Erosion Study Report: Summarize the statistical wave analysis, wave modeling, and sediment transport assessment in a Erosion Study Report. The Erosion Study Report will include figures illustrating the results of the analyses. Deliverables: Four (4) Copies of Erosion Study Report and PDF-file. Cummins | Cederberg 7550 Red Road, Suite 217 ▪ South Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com Tab G: Corporate Standing and Authorized Signatory State of Florida Department of State I certify from the records of this office that CUMMINS CEDERBERG,INC.is a corporation organized under the laws of the State of Florida,filed on March 16,2010,effective March 17,2010. The document number of this corporation is P10000023540. I further certify that said corporation has paid all fees due this office through December 31,2018,that its most recent annual report/uniform business report was filed on January 11,2018,and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Eleventh day of January,2018 Tracking Number:CC4889277870 To authenticate this certificate,visit the following site,enter this number,and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication 7550 RED ROAD, SUITE 217 SOUTH MIAMI, FL 33143 Current Principal Place of Business: Current Mailing Address: 7550 RED ROAD, SUITE 217 SOUTH MIAMI, FL 33143 US Entity Name: CUMMINS CEDERBERG, INC. DOCUMENT# P10000023540 FEI Number: 27-2129033 Certificate of Status Desired: Name and Address of Current Registered Agent: CEDERBERG, JANNEK 7550 RED ROAD, SUITE 217 SOUTH MIAMI, FL 33143 US The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both, in the State of Florida. SIGNATURE: Electronic Signature of Registered Agent Date Officer/Director Detail : I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under oath; that I am an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607, Florida Statutes; and that my name appears above, or on an attachment with all other like empowered. SIGNATURE: Electronic Signature of Signing Officer/Director Detail Date FILED Jan 11, 2018 Secretary of State CC4889277870 JANNEK CEDERBERG PRESIDENT 01/11/2018 2018 FLORIDA PROFIT CORPORATION ANNUAL REPORT Yes Title P Name CEDERBERG, JANNEK Address 22476 SW 94 PL City-State-Zip:CUTLER BAY FL 33190 Title VP Name CUMMINS, JASON R. Address 2212 SEACOFFEE TERRACE City-State-Zip:COCONUT GROVE FL 33133 Cummins | Cederberg 7550 Red Road, Suite 217 ▪ South Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com CUMMINS | CEDERBERG Coastal & Marine Engineering March 22, 2018 City of Sunny Isles Beach City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 Re: AUTHORIZED CORPORATE SIGNATORIES Dear Sir/Madam: The following people at Cummins Cederberg, Inc, a Florida Corporation, are authorized signatories of the firm: Jannek Cederberg, President Jason Cummins, Vice President Should you have any questions or require additional information, please do not hesitate to contact me at 305 741 6155 or jcederberg@CumminsCederberg.com. Sincerely, CUMMINS CEDERBERG, INC. Jannek Cederberg, M.Sc., P.E. President Cummins | Cederberg 7550 Red Road, Suite 217 ▪ South Miami, Florida 33143 Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 info@CumminsCederberg.com ▪ www.CumminsCederberg.com Tab H: Forms and Attachments City of Sunny Isles Beach |Request for Qualifications No. 18-02-01 31 RESPONDENT SUBMITTAL FORM MARINE AND COASTAL PROFESSIONAL ENGINEERING CONSULTING SERVICES (CCNA) The undersigned Firm proposes and agrees, if this submission is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents. The Firm accepts all of the terms and conditions of this Request for Qualifications. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Firms agrees to sign and submit the Agreement and other documents as required by the Bidding Requirements within ten days after the date of the City’s Notice of Award. In submitting this response, the Firm represents, as more fully set forth in the Agreement, that: The Firm has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. The Firm has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. The Firm has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Firm. This solicitation is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Firm has not directly or indirectly induced or solicited any other Firms to submit a false or sham Bid; the Firm has not solicited or induced any person, firm or corporation to refrain from Bidding; and Firm has not sought by collusion to obtain for itself any advantage over any other Firms or over the City. The City and the successful Firm will establish completion times for the services described in this Request for Qualifications and the successful Firm agrees that the services will be completed within the time frames agreed upon and stipulated in the individual Notice to Proceed. INSR ADDL SUBR LTR INSR WVD DATE (MM/DD/YYYY) PRODUCER CONTACT NAME: FAXPHONE (A/C, No):(A/C, No, Ext): E-MAIL ADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY)(MM/DD/YYYY) COMMERCIAL GENERAL LIABILITY AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATION AND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE INSURER(S) AFFORDING COVERAGE NAIC # Y / N N / A (Mandatory in NH) ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? EACH OCCURRENCE $ DAMAGE TO RENTED $PREMISES (Ea occurrence)CLAIMS-MADE OCCUR MED EXP (Any one person)$ PERSONAL & ADV INJURY $ GENERAL AGGREGATE $GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ $ PRO- OTHER: LOCJECT COMBINED SINGLE LIMIT $(Ea accident) BODILY INJURY (Per person)$ANY AUTO OWNED SCHEDULED BODILY INJURY (Per accident)$AUTOS ONLY AUTOS AUTOS ONLY HIRED PROPERTY DAMAGE $AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE $ CLAIMS-MADE AGGREGATE $ DED RETENTION $$ PER OTH- STATUTE ER E.L. EACH ACCIDENT $ E.L. DISEASE - EA EMPLOYEE $ If yes, describe under E.L. DISEASE - POLICY LIMIT $DESCRIPTION OF OPERATIONS below POLICY NON-OWNED SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer any rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORDACORD 25 (2016/03) ACORDTM CERTIFICATE OF LIABILITY INSURANCE Phoenix Insurance Company Travelers Casualty and Surety Company XL Specialty Insurance Company 09/20/2017 USI Insurance Services, LLC, 1715 N. Westshore Blvd. Suite 700 Tampa, FL 33607 813 321-7500 813 321-7525 Cummins Cederberg, Inc. 7550 Red Road, Suite 217 South Miami, FL 33143 25623 19038 37885 A X X X X X 6604H492215 07/23/2017 07/23/2018 1,000,000 1,000,000 10,000 1,000,000 2,000,000 2,000,000 A X X X X 6604H492215 07/23/2017 07/23/2018 1,000,000 B N UB5J81862A 09/26/2017 09/26/2018 X 1,000,000 1,000,000 1,000,000 C Professional Liability DPR9912773 03/30/2017 03/30/2018 $1,000,000 per claim $1,000,000 annl aggr. Professional Liability coverage is written on a claims-made basis. For Proposal Purposes 1 of 1 #S21511482/M21511444 CUMMICEDClient#: 1054258 GITEW 1 of 1 #S21511482/M21511444