Loading...
HomeMy WebLinkAboutMoffatt & Nichol Title Page Applicant Firm: Moffatt & Nichol 2937 SW 27th Avenue, Suite 101A Coconut Grove, Florida 33133 Main Contact: Tim Blankenship Tel: (305) 230-1924 March 22, 2018 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) Table of Contents Cover Letter & Executive Summary 1 Project Approach & Understanding 3 Qualification Information & Assigned Personnel 10 Firm References & Similar Work Completed 61 Corporate Standing & Authorized Signatory 66 Forms & Attachments 72 2937 SW 27th Avenue, Suite 101A Coconut Grove, FL 33133 (305) 230-1924 www.moffattnichol.com | Page 1 Cover Letter and Executive Summary March 22, 2018 Sunny Isles Beach Government Center 18070 Collins Avenue Sunny Isles Beach, FL 33160 Attn: City Clerk Subject: City of Sunny Isles Beach | RFQ No. 18-02-01 | Marine and Coastal Professional Engineering Consulting Services (CCNA) Dear Mr. Betancur, Moffatt & Nichol (M&N) is pleased to submit the attached qualifications package in response to your Request for Qualifications (RFQ) for a consultant to support the City of Sunny Isles Beach (City) on the Marine and Coastal Professional Engineering Consulting Services contract. The package is organized into the format requested in the RFQ. Scope of Work: M&N has a clear understanding of the RFQ scope of work, and is committed to perform the work in accordance with the terms of the response herein. The M&N team has the expertise and experience to provide all engineering and supporting design, permitting, funding procurement and management, construction phase, and other technical services associated with marine and coastal engineering projects. M&N has extensive experience with the types of contracts anticipated by this RFQ, including coastal erosion risk and mitigation assessments, shoreline erosion/accretion and other modeling, project financial planning and management, design and permitting for potential solutions such as beach nourishment projects and erosion mitigation structures. M&N staff have a comprehensive understanding and experience with the FDEP Coastal Construction Control Line (CCCL) permitting program, Erosion Control Lines, and the federal, state and county permitting process required for marine and coastal projects. Project Team: M&N has been in business for over 71 years, and the firm currently employs 670 professional staff in 36 offices throughout the U.S., Latin America and Europe. There are multiple advantages to working with M&N. We are large enough to have both depth and breadth of technical capabilities and expertise, yet small enough to retain industry-leading expertise on water-related challenges. The firm offers clients a professional and experienced staff of civil, structural, mechanical, electrical, coastal and construction engineers. Our services are supplemented by the expertise of our subconsultants, with whom we have an established relationship. Marine Engineering: M&N has a broad range of capabilities within the marine engineering field, and the firm is routinely ranked as one of the top marine and port facilities engineering firms in North America by Engineering News Record. Recent projects include marinas and other mooring facilities, dredging and land reclamation works, non-coastal shore protection structures, and habitat mitigation/restoration works. Coastal Engineering: As one of the first engineering firms in the world to embrace the concept of modern coastal engineering, M&N’s reputation for excellence in the coastal engineering field has been built on years of experience working on complex and challenging projects along the world’s coastlines. Today, the firm offers clients an elite, influential staff of engineers, planners, and scientists who are recognized for solving global issues related to coastal and marine systems. M&N also brings unmatched ƒMore than 100 public park and alternative transportation corridor projects ƒOver 100 kilometers of breakwaters, jetties and shoreline stabilization projects ƒMore than 100 deep sea container terminals ƒMore than 50 bulk marine terminals (dry and liquid) ƒOver 80 kilometers of piers and wharves ƒMore than 300 marinas totaling over 50,000 boat slips ƒOver 500 million cubic meters of dredging ƒMore than two dozen cruise and ferry terminals ƒOver 1,500 hectares of ecosystem creation/ restoration Moffatt & Nicholby the Numbers | Page 2 experience in numerical modeling of the physical processes that challenge all manner of waterfront projects in these settings. We offer the City access to the latest technologies and the industry’s leading practitioners, solving complex problems using state-of-the-art technologies, but with a practical approach that has been developed over decades of experience on constructed projects. The firm employees over 90 coastal engineers, which is one of the largest in the U.S. for coastal engineering. Recent projects include beach nourishment and inlet projects, coastal shore protection structures, flood protection and other climate change/resiliency planning/mitigation projects, complex FDEP CCCL permitting projects and flood code compliance consulting. City of Sunny Isles Beach Experience: M&N and their subconsultants have demonstrated project experience in the City, and key staff have worked on local projects including the Residences by Armani/Casa project with beach fill component that is scheduled to start construction next week, the Jade Signature project FDEP CCCL permitting and beach fill project (with a prior firm), and numerous other coastal projects. M&N has an in-depth understanding of beach management in the City based on staff experience working on oceanfront projects over the past 20 years, including recent truck haul beach nourishment projects and CCCL permitting projects. Capability to Perform Work: If selected, M&N is willing to meet any project location, with no limitation on budget amount (large or small) or task orders. While the firm currently has a strong backlog of work, it is at the same time sufficiently staffed with qualified personnel of all types that will be required to perform the work associated with contracts/task orders resulting from this RFQ within the required time frame. Projects will be managed out of the Miami office, with production support out of other M&N offices, as appropriate. Firm Licensure and Representations: M&N will warrant that at all times during the term of the Agreement we shall maintain in good standing all required licenses, certifications and permits required under federal, state and local laws necessary to perform the services. The following individuals are authorized to make representations for the Firm: Jeffrey Malyszek, PE, Vice President 501 East Kennedy Blvd., Ste. 1910, Tampa, FL 33606 P: 813-258-8818 Timothy K. Blankenship, PE, Office Manager 2937 SW 27th Ave., Ste. 101A, Miami, FL 33133 P: 305-230-1924 As proposed Project Manager, Ms. Christy Brush will serve the City as the main point of contact. Christy can be reached at (786) 725-4182 (direct) or cbrush@moffattnichol.com. We look forward to the opportunity to present our qualifications and approach to the City. Very truly yours, MOFFATT & NICHOL Jeffrey Malyszek, PE Vice President Christy Brush Environmental Regional Manager | Page 3 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) Project Approach & Understanding Project Understanding We understand that the City of Sunny Isles Beach (City) is seeking a qualified engineering consultant to provide marine/ coastal, civil, geotechnical, environmental engineering along with regulatory permitting, marine biology, surveying, construction administration and architectural services. Moffatt & Nichol (M&N) and our subconsultants have a proven track record with public sector clients for creative, efficient and cost-effective delivery of coastal and marine engineering projects that are similar in scope to those included in this RFQ. Key personnel in M&N’s Miami office – Ms. Christy Brush, Ms. Laura Shepherd, and Mr. Timothy Blankenship - have directly contributed to several coastal projects in the City. These projects have included Florida Department of Environmental Protection (FDEP) Coastal Construction Control Line (CCCL) projects for oceanfront development. Ms. Brush is currently coordinating with the City to facilitate implementation of truck haul beach nourishments in the City on behalf of private developers. These projects have resulted in beach management within the City at no cost to the County or to the City. Ms. Brush and Ms. Shepherd have managed the CCCL permitting of many of the private redevelopment projects over the past 20+ years along the oceanfront within the City while employed at their previous firm, and currently M&N has four active CCCL permitting projects within the City. While employed at their previous firm, Mr. Blankenship and Dr. Yong Chen were the lead coastal engineers in the “Phase I - Shoreline Stabilization Study Report” prepared for the City in 2009. M&N staff have direct project experience in the City and along the coast of Miami-Dade County. The following proposed approach and methodology is based on our team’s experience and working knowledge in the City as well as from other successful South Florida coastal/marine projects. Firm Organization Our entire project team has extensive experience with a variety of public and private sector clients, including work with and within the City. We are routinely engaged in, fully understand, and can efficiently manage multi-disciplinary projects, ensuring that quality, schedule, and budget needs are fully realized. M&N will plan and manage all work from our Miami office, and perform the greatest practicable extent of work within that office. Likewise, our subconsultants will perform their work in their local/regional offices. Firms have been selected as subconsultants based on working relationships developed over many years. CSA Ocean Sciences and M&N are teamed on large NOAA contracts, with values exceeding $10M, and the firms are currently teamed on coastal engineering contracts with the City of Hollywood. Morgan & Eklund, a subsidiary of CSA, is currently working on the Hillsboro Beach Nourishment project designed and permitted by M&N, and they also worked on the Key Biscayne Nourishment in 2017 with M&N. M&N works regularly with Revuelta Architecture, and their office is across the street from M&N’s Miami office. M&N has subconsulted four geotechnical projects to HP Consultants for a similar marine/coastal engineering contract with City of Miami, and HP is a CBE firm within Miami-Dade County. Key personnel with M&N have worked extensively with EE & G in the past on environmental assessment and remediation projects for both private and public sector clients. M&N is accustomed to managing projects with many multi-disciplined team members, both in-house and subcontracted. M&N will retain full and ultimate responsibility for successful project management and completion, and will maintain full accountability for all assignments undertaken by our highly-qualified subconsultants. We will draw on our Team resources to meet the specific needs of the site investigations, strategy/design report preparation and preliminary design, agency involvement and permitting, funding applications and management, final design, and construction support and construction inspection services. We will conduct regular Team meetings to review progress and facilitate communication. Strategy and Work Plan For each assigned project/task order, a kick-off meeting or discussion will be held with the City to review the scope, key project goals and elements, schedule, responsibilities and resources, risk/benefit variables, costs, and other items that are pertinent for success. M&N will collaborate with the City to establish a custom strategy that is tailored to the needs of each project/task order. Furthermore, we pride ourselves in looking at all aspects of a project during the strategy development stage, considering matters | Page 4 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) such as construction vs. maintenance costs, permitting feasibility, and legal risks. Evaluating a wide range of perspectives and variables allows us to provide our clients with better alternatives that meet their needs. Due to this diligence, the City will be presented with options to vet and determine which parameters are critical to your project and as such, cost savings are realized during project development. The M&N team has experience in the City that will provide valuable perspective and a broad base of existing knowledge from which a project strategy and work plan will be developed. M&N personnel are keenly aware of beach management north of Bakers Haulover Inlet as well as the coastal processes south of Port Everglades that influence beach management. Mr. Blankenship was engineer-of-record for several of the active truck haul beach nourishment projects permitted by Miami-Dade DERM since a 2005 timeframe. He is currently engineer-of-record for the scheduled beach nourishment in the City relative to the Armani Development as part of the project’s CCCL permitting. Mr. Blankenship was the Project Manager for the 2009 study while employed at his former firm, and this study evaluated the existing artificial reef designed/constructed by the U.S. Army Corps of Engineers. He has also completed designs for several artificial reefs in southeast Florida, and utilized “Reef Balls” for various projects. Ms. Brush and Mr. Blankenship are intimately familiar with all of the biological conditions and regulations that affect marine project design and construction in Miami-Dade County – such as for shoreline stabilization and docking facilities on the Intracoastal Waterway and in canals – are currently in the process of securing permits for shoreline improvements for a private client in Sunny Isles Beach. Based on this knowledge and our initial conversations with the City for each task order, we will develop a concise and focused project work plan tailored to the needs of each phase of the assignment. The project-specific work plan will identify the Team members, their roles and responsibilities, project objectives, phasing, deliverables, project budget, our communication plan, quality assurance and quality control procedures, and project administration requirements. Scheduling, coordination, and communication procedures will be fully described in the work plan, to ensure secure and efficient communication and coordination for all involved parties throughout the course of project development, review, and execution. Our work plans provide detailed project schedules that encompass all project activities and milestones, from the initial kickoff meeting to the certification of completion submitted at the end of each task assignment. Milestones included in the project schedule include those for meetings, field activities, status review, quality control submittals, client review periods, and interim submissions as needed to validate work progress and conformance to standards. M&N is committed to providing quality and cost-effective planning, engineering, architecture, permitting and construction support services, with a focus on the objectives of the client, the preferences of the stakeholders, and the needs of the user groups. We will consider both short-term and long-term ambitions of the City and establish a clear path for successful performance. Our fundamental project management philosophies include: ƒIdentifying early in the planning/permitting/design process any potential project opportunities, constraints and variables ƒConsidering potential needs for future related projects/tasks ƒEngaging all involved, for clear, consistent and open communication ƒProviding efficient, constructible designs that maximize the City’s return on investment ƒDevelopment of creative solutions, as appropriate ƒStrict control of project schedules and the assigned staff ƒAssigning professional staff with appropriate experience and capabilities, as well as consistent staffing to ensure continuity and quality ƒDedication of sufficient staff resources to fulfill project needs ƒA comprehensive QA/QC program tailored to meet individual project requirements Attendance at Commission Meetings The M&N team regularly participates in public workshops/meetings, including City/County Commission meetings for a variety of public sector clients. These meetings are often attended with short notice and during the day and/or evening. Miami-based staff strive to be responsive, and multiple staff are involved with Projects to ensure staff are available on short notice. Presentations are regularly provided/given. Recent Council/Commission experience in southeast Florida includes the following: ƒVillage of Key Biscayne ƒCity of Miami - Commission and Advisory Board(s) ƒMiami-Dade County BOCC | Page 5 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) ƒCity of Hollywood ƒTown of Hillsboro Beach ƒTown of Palm Beach Quality Assurance/Quality Control The M&N team has also established a formal quality assurance/quality control (QA/QC) framework that will be followed to promote the highest quality of work possible. The primary goal of the proposed project is to provide a planning document or project design that can be executed or constructed so it will function successfully. M&N operates under the requirements of a Quality Control Manual that sets the requirements for internal QA/QC. The plan requires a QA/QC plan to be prepared at the outset of each project identifying the staff responsible to perform the review, the documentation to review, and the review dates. It requires a portion of the project budget to be allocated to the review, and allows for an internal review audit to occur on any project at any time. The QA/QC process for this project will involve the following elements: ƒSubcontract agreements with clearly defined scope, due dates for each deliverable, fee, and contractual terms consistent with the prime contract; ƒA detailed project schedule that is jointly developed and coordinated with all team members (as well as the City; ƒLabor hours allocated by task and by staff; ƒMonthly, at a minimum, progress reports showing status to budget; and/or ƒLess formal processes include meetings and frequent email and telephone communications. All project managers must adhere to this requirement for every project. This process has formally been in place at M&N for many years and works well to identify potential errors or faulty assumptions and methods. Our designs have been successfully constructed and our work has withstood the highest level of scrutiny by “blue ribbon” panels due to this QA/QC procedure. In addition, construction plans and engineering calculations are regularly packaged and sent to another one of M&N’s 30+ offices for an independent QA/QC check. This independent check is fully documented and the project team is debriefed on the results which further strengthens the quality control requirements of a project. In addition, this independent check also evaluates constructability relative to available materials, equipment and labor. Data Collection The M&N team will work with the City to collect available background/technical data that is needed for planning, design, permitting and other tasks. The City will provide past and current project documents and technical reports, and M&N will pull data from internal reference files, other public agencies, and other available sources to minimize the time and cost of new data collection. The team will also confirm the scope for collection of any missing data or additional investigations that may be critical to the project design/function or evaluation of compliance with applicable environmental and other regulations. For projects/task orders requiring in-water data collection, M&N will collaborate with the City and fellow team members Morgan & Eklund, a surveying firm with whom we have worked with regularly who has extensive experience with beach-dune system topographic and hydrographic surveys that meet the stringent regulatory requirements of the U.S. Army Corps of Engineers (Corps) and FDEP. Detailed surveys of existing/pre-construction conditions are critical for design and permitting of dune restoration and beach renourishment projects, as well as seawall, marina, estuarine enhancement, park and other marine projects. M&N environmental personnel will work with the City and CSA Ocean Sciences for detailed mapping of existing native and exotic vegetation in beach-dune, mangrove and other ecosystems that may be affected by proposed projects. M&N will coordinate with CSA to provide marine biological mapping services required for beach renourishment, shoreline stabilization, marina and other in-water works. Based on key personnel experience in the area, Miami-Dade DERM biological data can also be utilized where appropriate to save on costs. Mapping of these resources in accordance with regulatory agency requirements is essential for project design and permitting. CAD base files will be generated for all mapping efforts for use in Project design by the M&N team and the City. CAD base files may also, as appropriate, incorporate the latest high resolution rectified aerial photography available from the City or from Miami Dade County GIS. Sea Level Rise/Resiliency Planning Our coastal engineers have routinely evaluated local and global sea level as part of coastal flood protection projects, and they | Page 6 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) are very familiar with risk-based probabilistic methods used in project life cycle analysis and risk assessments. M&N has unique capabilities to provide flexible designs in the marine environment that can be adapted for sea level rise. Over the years we have developed innovative approaches to address complex issues such sediment transport, storm surge, beach erosion, water qualify and sea level rise (SLR) attributable to global climate change. We are particularly qualified to assess the vulnerability to SLR and to develop adaptation/mitigation strategies in a manner that responds to the needs of project sponsors, owners, and public sector clients. M&N has provided resiliency consulting services in other parts of the U.S. including New York, Norfolk, VA, San Francisco and New Orleans. M&N has been a subconsultant for two resiliency infrastructure projects locally in the City of Miami Beach. Coastal Process Modeling M&N’s reputation for excellence in the coastal engineering field has been built on years of experience working on complex and challenging projects along the world’s coastlines. Today, the firm offers clients an elite, influential staff of engineers, planners, and scientists who are recognized for solving global issues related coastal, estuarine, and riverine systems. M&N also brings unmatched experience in numerical modeling of the physical processes that challenge all manner of waterfront projects in these settings. The firm employs over 90 coastal engineers in 36 offices, and the firm utilizes a wide array of numerical models for site specific applications. The firm regularly utilized MIKE by DHI tools, as well as DELFT3D for complex sediment transport modeling. At our Long Beach office, the firm operates and maintains a core of processors dedicated to numerical model simulations for efficient processing of complex numerical models. These tools allows us to efficiently run more simulations and scenarios efficiently to facilitate coastal engineering projects and resource allocation. M&N will provide any coastal process modeling services required for the City’s beach management planning and project design/permitting needs. These models have also been applied for estuarine projects throughout the U.S. Design Shoreline protection is one of our firm’s core disciplines and includes planning, permitting, design and construction services for beach nourishment, coastal structures, erosion and flood protection, as well as resource enhancement. Recognition of our marine expertise is evident through repeated top rankings by Engineering News Record as one of the top Marine and Port facility firms in the US. Design efficiency is provided through the collection of appropriate field data; for example, geotechnical/ geological investigations, benthic resource surveys, and topographic/hydrographic data can provide an optimized engineered design for coastal and waterfront projects. M&N will be providing engineering and environmental permitting services with in- house technical staff, and therefore the engineering design will progress concurrently and efficiently with the environmental permitting process. For coastal/waterfront projects, initial schematic design is completed through the development of permit sketches. The project may be modified through the environmental permitting process and the sketches will include the required information, along with specific information required by the agencies, to expedite the permitting process. Once the Project permitting is progressing, M&N will complete the design development and preparation of construction documents. Key staff at M&N have compiled construction documents for past beach management projects that were successfully implemented. The team will also prepare technical specifications for the specific trades applicable to the project such as dredging, beach fill, marine structures, floating docks environmental protection, vibration monitoring, turbidity control/ monitoring, and construction surveying. M&N utilizes the Unified Facilities Guide Specifications (UFGS), which are consistent with the specifications utilized by the U.S. Army Corps of Engineers. These specifications comply with Construction Specification Institute (CSI) standards, and can be incorporated into the City’s standard construction documents. Should the City select the design/build method of procurement for implementation of a project, M&N has extensive experience throughout the U.S. working with contractors on design/build projects. This experience and capability facilitates M&N compiling design/build criteria documents for public sector clients to procure the design/build delivery of projects. Funding Grant Coordination The M&N Team has a proven track record with obtaining grants for public projects. Our grant writers help to identify available grants and can work with the City to develop a winning grant application strategy. Winning grants often requires understanding and optimizing the scoring system by demonstrating public benefit, public partnerships, and local involvement through partial matching funds or other means. Our Team finds the most efficient combination of these items and prepare a custom grant | Page 7 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) application that highlights why a particular project is the most deserving of funding. M&N has extensive experience with FDOT Local Agency Program (LAP) grants that have funded oceanfront and waterfront paths in the past since they are means of alternative transportation. Key personnel in the Miami office have extensive experience with projects funded by the Florida Inland Navigation District (FIND) in southeast Florida. In addition, key staff have assisted Florida municipalities with LGFR beach management funding requests through the Florida DEP. Currently staff are providing FDEP funding assistance for two municipalities in southeast Florida, and one beach management project has qualified for FEMA assistance after Hurricane Mathew. M&N have continued to meet with FEMA and provide appropriate documentation to maximize the amount of funding for design, construction, and monitoring of the engineered beach project. M&N has also served as a subconsultant for FEMA’s response to 2017 hurricane impacts in Texas, Georgia, U.S Virgin Islands and Puerto Rico. This experience with FEMA performing assessments and assisting the communities with funding for recovery can be applied to the City projects as well as coordination with Miami-Dade County. Regulatory Analysis and Permit Approvals For all projects/task orders, M&N will review the pertinent regulations and provide feedback to the City and the project team regarding implications of applicable permitting criteria to the project’s planning and design. M&N typically holds consultation- level discussions with jurisdictional permitting agency staff during the project conceptual design process and as part of the diligence for any planning/design criteria document to ensure that the project meets regulatory criteria, and will advise the City at the earliest opportunity of any potential opportunities or issues. M&N will prioritize and execute effective communication with the City, regulatory agency staff and stakeholders to bring consensus to the final product and permit approvals. Key M&N personnel have extensive experience and strong working relationships with FDEP and Corps permitting staff, as well as commenting agencies, which may include the Florida Fish and Wildlife Conservation Commission (FWC), the U.S. Fish and Wildlife Service (FWS), the National Marine Fisheries Service (NMFS), and/or the U.S. Environmental Protection Agency (EPA), depending on the project/task scope. To minimize Requests for Additional Information (RAI), the team will communicate strategically and clearly with the permitting agencies during all phases of the project and will work closely with the City to prepare comprehensive permit applications. M&N key personnel have a deep understanding of Joint Coastal (JCP), Coastal Construction Control Line (CCCL) and Environmental Resource (ERP) permitting in Florida. The City will be provided regular permitting strategy and progress updates, and key agency communications will be reviewed with the City project manager prior to transmittal. The M&N team will work with the permitting agencies to provide procedural/ policy input and technical responses, as applicable, to expedite the permitting process and yield the most beneficial result for the project. M&N staff also have experience in processing emergency/expedited permit authorizations, whether due to coastal storm impacts under a State-issued Emergency Order, or for a site-specific situation, and are familiar with the applicable laws and procedures. Once the major regulatory compliance issues are addressed for any given project/task order during the conceptual design phase, the M&N team can progress to Design Development plans concurrently during the permitting process. The project implementation schedule will be optimized with permitting and engineering design. Environmental Assessments EE&G will be responsible for environmental assessments under this contract. The firm has 30 years of experience in consulting related to hazardous waste management and remediation, asbestos, lead-based paint, industrial hygiene and indoor air quality, environmental audits, compliance audits, property acquisition/cleanup, resource recovery/recycling services, and emergency/ disaster response. Their environmental service staff includes Engineers, Scientists, Geologists, Certified Industrial Hygienists, and Support Professionals. For environmental engineering assignments, EE & G will provide the City with Phase I and II Assessments, Site Environmental Design and Permitting, Environmental Remediation, and Underground/aboveground Storage consulting. Many coastal and waterfront projects require these environmental assessments and processing with DERM’s Pollution and Remediation (POLREM) division, and key personnel at M&N have worked extensively with EE & G on remediation projects in Miami-Dade County. In addition, HP Consultants provides drilling/sampling services to support EE & G efforts. They can also install groundwater monitoring wells if needed. | Page 8 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) Architecture Revuelta Architecture International will provide architectural services required under the contract. The firm has completed the design of some of South Florida’s leading landmark residential, commercial, hospitality, and mixed-use projects. M&N’s office is across the street from Revuelta’s office in Miami, and the firms regularly collaborate on projects in southeast Florida. The architectural assignments under this contract are anticipated to be small; however, Revuelta’s firm has full architectural capabilities to support contract assignments. Although not specified in the RFP, the Revuelta team may need to retain other consultants such as structural and mechanical/electrical/plumbing (MEP) engineers to provide the full range of services inside the building envelope, as applicable. Construction Planning and Administration M&N will assemble the bid documents for the Project to assist the City with the bid process. M&N has implemented a variety of construction projects throughout Florida for public sector clients using client-provided “up front” contract documents. M&N will work with the City to ensure the “Best Value” procurement process is implemented that will result in the “lowest, most responsive bidder.” A “low bid” selection process can result in an unqualified contractor being awarded the contract, and this type of process can result in claims, schedule delays, and construction that is not in accordance with the plans/specifications. M&N has implemented bidding processes on a fast-track process that has included incorporating all environmental permit conditions in the construction documents prior to final environmental permit issuance. M&N monitors the unit prices and trends in the marine, dredging and coastal construction industry. Timing of project bidding can result in significant cost savings, especially relevant to mobilization of marine construction equipment. The M&N team will provide updated construction cost estimates at every phase of the project design from initial schematic design (environmental permitting) through design development and preparation of construction documents. M&N has former marine contractors on staff in Florida that assist in constructability reviews and cost estimating. M&N provides a “hands-on” approach to construction administration with regular site visits, and Representative Project Representative (RPR) services (full time inspection) have been provided to public sector clients. These services are currently being provided on the Town of Hillsboro Beach’s beach nourishment, and will also be provided in Sunny Isles for the beach nourishment project associated with the Armani development. M&N regularly utilizes web-based construction management to facilitate construction documents control utilizing the NewForma software. In addition, the Engineer-of-Record for the coastal and marine projects will make representative site visits and oversee any of the construction inspection. M&N strongly supports the active participation and oversight of the professional engineer that completed the design work throughout construction. Project Environmental and Physical Monitoring Beach management projects require physical and biological monitoring for FDEP and Corps permit compliance usually for a period of 3 years post construction. This monitoring could include benthic or wetlands surveys to monitor potential effects from the Project or the required monitoring of a mitigation project to ensure success of the mitigation. M&N will assist the City in reviewing biological monitoring reports and assist with processing through the agencies for permit compliance. Beach management projects will require physical monitoring, and the team has extensive experience with this monitoring. Morgan & Edklund will provide the required hydrographic/topographic surveys and provide data in the FDEP-standard formats as overseen by M&N. M&N will prepare the physical monitoring reports that assess beach project performance. Estuarine Enhancement The firm has extensive experience throughout the U.S. in developing habitat creation and mitigation projects. The firm recently designed and managed construction for 820 acres of coastal wetlands restoration of the Barataria Basin in Louisiana. This work involved a 13-mile dredge discharge pipeline. Key personnel at M&N have Miami-Dade County experience with the environmental restoration, and CSA is one of the leading firms in the country with the design and implementation of environmental enhancement projects. | Page 9 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) Emergency Storm Response M&N has held contracts with FEMA for many years and has responded to a number of named storms to provide coastal assessments and to assist communities for Requests for Public Assistance (RPA) specifically for qualifying engineered beaches. M&N recently responded to erosion for municipal clients in southeast Florida, and is currently processing FEMA reimbursement for a municipality in Broward County impacted by Hurricane Mathew. M&N also recently implemented a FEMA dune restoration project in North Carolina. M&N has the resources to respond promptly to assess shorelines and inland waterways after storm events. Innovation M&N continues to lead the industry with innovative approaches to coastal and waterfront projects. The firm regularly designs and permits living shorelines, and has been addressing resiliency with coastal protection projects worldwide for over 30 years. As one of the first engineering firms in the world to embrace the concept of modern coastal engineering, M&N’s reputation for excellence in the coastal engineering field has been built on years of experience working on complex and challenging projects along the world’s coastlines. ƒThe firm regularly provides innovative solutions to coastal/waterfront projects: ƒSpecification of alternate materials for waterfront applications such as vinyl sheet piling ƒUse of recycled materials in concrete ƒCoastal Protection Solutions – optimized through advanced numerical modeling for submerged breakwaters and artificial reefs ƒUse of Reef Balls for cost-effective mitigation in Biscayne Bay as opposed to traditional limestone boulders ƒDesign of living shorelines ƒIntegration of resiliency projects with green infrastructure and public space | Page 10 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) Qualification Information & Assigned Personnel ARCHITECT – ENGINEER QUALIFICATIONS PART 1 – CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Marine and Coastal Professional Engineering Consulting Services (CCNA) 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER February 27, 2018 RFQ No. 18-02-01 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Jeffrey D. Malyszek, PE 5. NAME OF FIRM 6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS (305) 230-1924 (813) 258-8525 jmalyszek@moffattnichol.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PR I M E J- V PA R T N E R SU B C O N TR A C T O R a.  Check if branch office 2937 SW 27th Avenue, Suite 101A Coconut Grove, FL 33133 Prime Consultant, Coastal and Structural Engineering, and Coastal/Environmental Permitting Moffatt & Nichol b.  Check if branch office 501 East Kennedy, Suite 1910 Tampa, FL 33602 Waterfront/Waterway Engineering, Construction Cost Estimating Moffatt & Nichol c.  Check if branch office Moffatt & Nichol 1025 Greenwood Boulevard, Suite 371 Lake Mary FL 32746 Civil Engineering d.  Check if branch office 1616 East Millbrook Road, Suite 160 Raleigh, NC 27609 GIS, Coastal Data Moffatt & Nichol e.  Check if branch office 101 W. Main Street 800 World Trade Center Norfolk, VA 23510 Coastal Engineering Moffatt & Nichol f.  Check if branch office 2950 SW 27th Avenue, Ste. 110 Miami, FL 33133 Architecture Revuelta Architecture International g.  Check if branch office 10220 SW 107St. Miami, Fl., 33176 Geotechnical, Geology HP Consultants, Inc. h.  Check if branch office Morgan & Eklund, Inc. 4909 US Highway 1 Vero Beach, FL 32967 Surveying i.  Check if branch office EE&G 5751 Miami Lakes Drive Miami Lakes, FL 33014 Environmental Engineering j.  Check if branch office CSA Ocean Sciences Inc. 8502 SW Kansas Avenue Stuart, FL 34997-7120 Environmental monitoring of the nearshore hardbottom, artificial reefs, bay side seagrass | Page 11 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) | Page 12 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Christy J. Brush Environmental/Permitting a. TOTAL b. WITH CURRENT FIRM 20 3 15. FIRM NAME AND LOCATION (City and State) Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) BS, Marine Science N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Brush provides environmental/permitting consulting services and a range of client/stakeholder coordination, project strategy, and project management functions in her role as Environmental Regional Manager for Moffatt & Nichol. Her 20 years of experience includes coordination among project teams and regulatory agencies to acquire permits and secure/administer public funding. This experience includes a variety of projects in the coastal, waterfront, and marine environment involving coastal/waterfront resorts, residential/mixed-use structures, parks/other recreational facilities, docks & marinas, beach nourishment, stabilization/maintenance of inlets, beach, and inland shorelines including protective structures, stormwater drainage systems, coastal/marine habitat restoration, and other environmental enhancement projects. She regularly assists with the assessment of potential environmental impacts for proposed projects and represents clients in agency discussions of those impacts and potential mitigation. She has an in-depth understanding of the many regulations and procedures governing coastal/waterfront construction, and has worked with top environmental/ land use attorneys to support precedent-setting projects. Ms. Brush has regulatory permitting experience with the US EPA, FEMA, USACE, NOAA/Nat. Marine Fisheries Services, US Fish & Wildlife Service, FL DEP Coastal Construction Control Line, Joint Coastal, Environmental Resource and NPDES Permitting, FL Division of State Lands, FL Water Management Districts, FL Fish & Wildlife Conservation Commission, and various local planning, zoning, & environmental agencies. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Dinner Key North Mooring Field, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 (Est.) 2019 (Est.) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contracted for the design and permitting of a public managed mooring field, along with associated channel realignment and motorized vessel exclusion zones. Managed the marine resource and hydrographic surveys conducted, and the mooring field layout was established based on minimum water depths required to protect water quality. Assisted with update to the Mooring Field Management Plan. Includes waterway marker and boating restricted zone permitting with the USCG and FL Fish & Wildlife Conservation Commission. Ms. Brush serves as Environmental Permitting Senior Project Manager, overseeing the federal, state and county permitting processes. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hillsboro/Deerfield Beach Nourishment, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2021 (Estimated) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Provided coastal engineering and physical and biological monitoring services for the 2015 beach nourishment project in accordance with the permits. Designed and secured permits for a 33,700 c.y. truck haul beach nourishment event built in 2018. Ms. Brush serves as Environmental Permitting Senior Project Manager, overseeing the federal, state and county permitting processes, FEMA funding administration, marine biological investigations, and permit compliance. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Residences by Armani/Casa, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 (Estimated) 2018 (Estimated) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Conducted an initial permitting feasibility analysis and agency consultation to confirm the maximum feasible development envelope for the project design, followed by FDEP CCCL permitting and marine turtle lighting approvals for the project which includes a large parking pedestal and tower with amenity/pool deck. Worked closely with Miami-Dade County to process notices to proceed under their federal, state and county beach renourishment permits for a 28,500 c.y. beach fill project. Ms. Brush serves as Environmental Permitting Senior Project Manager. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hollywood Dune Master Plan PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Prepared a Dune Master Plan (Plan) that addresses dune maintenance and creation goals of the 2017 Hollywood Sustainability Action Plan. The Plan outlines a management approach that addresses improvements to existing dune features and new vegetated dunes. An important focus of the Plan is to foster dune projects that can have both immediate and long- term shore protection, ecological, and aesthetic benefits, while also developing a feasible program in terms of design, permitting, funding, and maintenance. Ms. Brush served as Environmental Permitting Senior Project Manager. | Page 13 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 2 MANDATORY USE DATE OF FORM 6/2004 e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Key Biscayne Beach Management PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2020 (Est.) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Completed the design, permitting and construction administration for a 26,000 cubic yard truck haul beach nourishment along 6,000 feet of shoreline. Physical and biological monitoring is ongoing to confirm compliance with environmental permit conditions. Ms. Brush serves as Environmental Permitting Senior Project Manager, overseeing the federal, state and county permitting processes, FEMA funding administration, marine biological investigations, and permit compliance. | Page 14 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Timothy K. Blankenship, PE Project Manager a. TOTAL b. WITH CURRENT FIRM 24 3 15. FIRM NAME AND LOCATION (City and State) Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) ME Coastal Engineering; BS Civil Engineering Florida, 55910, 2000 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Blankenship has over 20 years of experience with waterfront/marina, port infrastructure, and coastal engineering consulting projects throughout the U.S., Caribbean and Central America. He has completed over 50 marina and associated waterfront improvement projects. The marinas have included facilities for both wet and dry slips, and services have ranged from due diligence, planning, and feasibility studies, through engineering design, environmental permitting and construction administration. Mr. Blankenship has also completed numerous beach management projects throughout southeast Florida. He has managed field investigations including sand searches, sand compatibility testing, hydrographic and beach profile surveys, as well as geophysical surveys. He has served as Engineer-of-Record for several dredge and truck haul beach fill placement projects in Florida. Mr. Blankenship is a co-author of Manual 50, Planning and Design Guidelines for Small Craft Harbors published in 2012 by the Marinas 2020 Task Committee of the Ports and Harbors Committee of the Coasts, Oceans, Ports and Rivers Institute of the American Society of Civil Engineers. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Dinner Key North Mooring Field, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 (Est.) 2019 (Est.) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contracted for the marine structures design and environmental permitting of a public managed mooring field, along with associated channel realignment and motorized vessel exclusion zones. Managed the marine resource and hydrographic surveys conducted, and the mooring field layout was established based on minimum water depths required to protect water quality. Mr. Blankenship is the senior engineer overseeing design and engineer-of-record. b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Hillsboro/Deerfield Beach Nourishment, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2019 (Estimated) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contract to provide coastal engineering and physical and biological monitoring services for the 2015 beach nourishment project in accordance with the regulatory permits. Designed and secured permits for a 33,700 c.y. truck haul beach nourishment event built in 2018. Mr. Blankenship also managed the beach construction project by providing construction administration and managing Resident Project Representative (RPR) services and managing the post-construction physical and biological monitoring services provided in accordance with the environmental permits. Prior to joining M&N, Tim Blankenship served as project manager and engineer-of-record for the 2011 beach nourishment. c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Hollywood Dune Master Plan, Hollywood, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Prepared a Dune Master Plan (Plan) that addresses dune maintenance and creation goals of the 2017 Hollywood Sustainability Action Plan. The Plan outlines a management approach that addresses improvements to existing dune features and new vegetated dunes. An important focus of the Plan is to foster dune projects that can have both immediate and long-term shore protection, ecological, and aesthetic benefits, while also developing a feasible program in terms of design, permitting, funding, and maintenance. Mr. Blankenship served as Engineering Project Manager. | Page 15 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 2 MANDATORY USE DATE OF FORM 6/2004 d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Residences by Armani/Casa, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 (Est.) 2018 (Est.) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Conducted an initial permitting feasibility analysis and agency consultation to confirm the maximum feasible development envelope for the project design, followed by FDEP CCCL permitting and marine turtle lighting approvals for the project which includes a large parking pedestal and tower with amenity/pool deck. Worked closely with Miami-Dade County to process notices to proceed under their federal, state and county beach renourishment permits for a 28,500 c.y. beach fill project. Mr. Blankenship serves as engineer-of-record for the truck haul beach renourishment event. e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Key Biscayne Beach Management, Key Biscayne, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2020 (Est.) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Completed the design, permitting and construction administration for a 26,000 cubic yard truck haul beach nourishment along 6,000 feet of shoreline. Physical and biological monitoring is ongoing to confirm compliance with environmental permit conditions. Mr. Blankenship serves as Engineering Project Manager and engineer-of-record, overseeing Client management, public relations, field surveys, coastal engineering assessments, design, construction, and beach performance evaluations. | Page 16 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Yong Chen, Ph.D., P.E. Senior Coastal Engineer a. TOTAL b. WITH CURRENT FIRM 30 2 15. FIRM NAME AND LOCATION (City and State) Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) PhD, Civil and Structural Engineering, MS, River and Coastal Engineering, BS, Harbor and Waterway Engineering P.E., Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Dr. Chen has 30 years of experience in all phases of coastal engineering projects involving planning of field investigations and processing of field data from hydrographic surveys, geotechnical and wave/current gauges; navigation channel planning, port and harbor p lanning and sediment dredging analysis; FEMA coastal floodplain mapping; wave statistical analysis, wave propagation, storm surge analysis and sediment transport analysis; structural design projects involving riprap shore protection, breakwaters, jetties, single point mooring systems, marina basins, dredging, and beach nourishment and management. Dr. Chen has extensive experience in developing and utilizing software packages for numerical model simulations of coastal processes. He has applied the DHI MIKE21 modules for wave propagation and transformation, hydrodynamics, as well as the sediment transport packages. He has applied numerical modeling to optimize the planning and design of shore protection projects worldwide. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Village of Bal Harbour Beach Management, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016 N?A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Coastal engineer responsible for evaluation of coastal processes and sediment transport downdrift of Bakers Haulover Inlet. Conducted feasibility study to evaluate inlet bypassing options to maintain sediment transport and reduce beach erosion in Bal Harbour and Miami-Dade County beaches. b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Hillsboro/Deerfield Beach Nourishment, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2021 (Estimated) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Provided coastal engineering and physical and biological monitoring services for the 2015 beach nourishment project in accordance with the permits. Designed and secured permits for a 33,700 c.y. truck haul beach nourishment event built in 2018. Dr. Chen serves as senior coastal engineer reviewing the design and construction plans. He has also provided quality control reviews for physical monitoring reports of project performance. c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Residences by Armani/Casa, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 (Estimated) 2018 (Estimated) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Coastal engineering planning and design for 28,500 c.y. beach fill project to be constructed in 2018 by the developer as part of the Florida DEP CCCL permit process Dr. Chen provided coastal engineering and quality control for the planning and design of the beach nourishment. d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Town of Palm Beach South Restoration, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Coastal engineer responsible for feasibility study, equilibrium toe of fill (ETOF)assessment, and sediment transport modeling to support application processing for beach nourishment project. Evaluated sediment coming from updrift beach renourishment to opoptimize beach fill design to minimize impacts to nearshore hardbottom within Reach 8. Developed construction plans for dune and beach nourishment. | Page 17 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 2 MANDATORY USE DATE OF FORM 6/2004 e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Key Biscayne Beach Management, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2020 (Est.) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Completed the design, permitting and construction administration for a 26,000 cubic yard truck haul beach nourishment along 6,000 feet of shoreline. Physical and biological monitoring is ongoing to confirm compliance with environmental permit conditions. Dr Chen was the senior coastal engineer responsible for the equilibrium toe of fill (ETOD) analysis for the beach fill and served as project engineer for the beach nourishment design. | Page 18 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Michael N. Herrman, PE Waterfront and Docks a. TOTAL b. WITH CURRENT FIRM 19 19 15. FIRM NAME AND LOCATION (City and State) Tampa, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) MCE Coastal Engineering; BCE Civil Engineering Florida, 66025, 2007 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Herrman joined Moffatt & Nichol in 1997 following completion of his graduate studies in Coastal Engineering. Responsibilities include serving as project engineer or project manager on a wide range of urban waterfronts and marina projects. He conducts marina feasibility and market assessment studies for boating regions throughout the U.S., the Caribbean, and Central America. Related design experience includes planning, engineering, environmental impact assessments, including marina water quality assessments, permit facilitation, and construction support services. Specific design experience includes design of navigation, dredging, dock systems and marina related elements. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hillsboro/Deerfield Beach Nourishment, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2019 (Estimated) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contract to provide coastal engineering and physical and biological monitoring services for the 2015 beach nourishment project in accordance with the regulatory permits. Michael Herrman served as coastal engineer in the preparation of the physical monitoring for the beach fill preparing volumetric and shoreline analyses from survey data. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Palm Harbor Marina, West Palm Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2010 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contract to provide engineering services from preliminary master planning through construction for the redevelopment and expansion of an existing 160-slip commercial marina into a world-class 196-slip mega-yacht marina facility. Michael Herrman served as project engineer supporting the project manager in the review of plans and calculations as well as load cases from the floating dock vendor. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Tampa Riverwalk, Tampa, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contract to provide planning, permit support, and design services for the waterside components of this urban waterfront regeneration effort. Michael Herrman served as project engineer with the shoreline stabilization. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Residences by Armani/Casas, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016 2017 (Estimated) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contract to conduct an initial permitting feasibility analysis and agency consultation to confirm the maximum feasible development envelope for the project design, which includes a large parking pedestal and tower with amenity/pool deck. Michael Herrman served as project engineer for the 100-year storm erosion analysis in accordance with FDEP CCCL guidelines. He also served as project engineer for the 36,000 cy beach nourishment. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED St. Petersburg Municipal Marina Mooring Field Design St. Petersburg, Florida PROFESSIONAL SERVICE CONSTRUCTION (if applicable) 2015 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Project Manager responsible for layout, permitting, design, and construction support for the 26-slip mooring field. Elements include a floating dinghy dock, security gate, access gangway and fixed access platform, and utilities, including solar power lighting and potable water. Permitting requirements resulted in two construction phases and periodic communications with permitting agencies on construction progress. | Page 19 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Nicole Pauly, PE Structures a. TOTAL b. WITH CURRENT FIRM 7 5 15. FIRM NAME AND LOCATION (City and State) Tampa, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) MSCE Civil Engineering; BSCE Civil Engineering Florida, 78638, 2014 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Pauly is a structural engineer with over seven years of experience in the design of waterfront structures with expertise in the inspection, planning, design, preparation of permitting and construction documents, and post-construction award services for a variety of ports, marinas, and other waterfront facilities. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Palm Harbor Marina, West Palm Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2010 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contract to provide engineering services from preliminary master planning through construction for the redevelopment and expansion of an existing 160-slip commercial marina into a world-class 196-slip mega-yacht marina facility. Nicole Pauly served as a project engineer with the structural design of the shoreline stabilization. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Tampa Riverwalk, Tampa, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contract to provide planning, permit support, and design services for the waterside components of this urban waterfront regeneration effort. Nicole Pauly served as a structural engineer for the project. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED RMK Merrill Stevens North Yard Redevelopment, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017 (est) 2017 (est) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Engineering design of shipyard redevelopment with Shiplift to accommodate vessels up to 200 feet in length. Marine structural design of Shiplift basin, hoist foundations, and 4 pile-supported transfer berths. Ms. Pauly is structural engineer for the sheet pile bulkheads, hoist platforms, and transfer berth structural components. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Georgetown Canal Restoration and Shoreline Stabilization, Tampa, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016 (Estimated) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Structural engineer involved in the design and preparation of bid documents for the waterfront structures in a 150 acre residential development featuring an interconnected canal system with 23,000 linear feet of bulkhead and concrete retaining walls. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Dunedin Municipal Marina, Dunedin, Florida PROFESSIONAL SERVICE CONSTRUCTION (if applicable) 2014 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Project engineer for a multi-phase bulkhead and dock rehabilitation project for the City of Dunedin. Services provided include above water structural assessments of waterfront structures, completion of permit applications, waterfront structure repair/replacement designs, preparation of construction drawings, technical specifications, opinion of probable costs, and construction support services. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Dinner Key North Mooring Field, Miami, PROFESSIONAL SERVICE CONSTRUCTION (if applicable) 2018(est) 2019 (est) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contracted for the marine structures design and environmental permitting of a public managed mooring field, along with associated channel realignment and motorized vessel exclusion zones. Managed the marine resource and hydrographic surveys conducted, and the mooring field layout was established based on minimum water depths required to protect water quality. Ms. Pauly is the Project Engineer completing the design and construction plans. | Page 20 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Laura M. Shepherd, CFM Environmental/Permitting a. TOTAL b. WITH CURRENT FIRM 21 2.5 15. FIRM NAME AND LOCATION (City and State) Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) BS, Environmental Science N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Shepherd manages projects specifically involving coastal and environmental permit processing and environmental regulation compliance analysis, including FEMA compliance. Her project management responsibilities include coordination and review of project design plans and other technical/legal data required to effectively determine a project’s scope of work, including the elemen ts required to obtain environmental and construction permits. Ms. Shepherd applies her experience to the evaluation of technical and legal data required to effectively determine the feasibility of proposed projects and facilitate their implementation. Ms. Shepherd coordinates project teams for coastal and waterfront development projects; including design professionals, technical disciplines, and legal counsel. Ms. Shepherd also conducts vegetation assessments and surveys, as well as design and implementation of restoration plans for vegetated coastal habitats. She has an in-depth understanding of the many regulations and procedures governing coastal construction, and has established relationships with key regulatory agency personnel to expedite processing. Ms. Shepherd is accustomed to tight schedules and regularly coordinates teams of architects, engineers, scientists and environmental attorneys. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hollywood Dune Master Plan, Hollywood Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Prepared a Dune Master Plan (Plan) that addresses dune maintenance and creation goals of the 2017 Hollywood Sustainability Action Plan. The Plan outlines a management approach that addresses improvements to existing dune features and new vegetated dunes. The entire City beach was evaluated and the dunes were categorized by physical/geographic characteristics and existing condition. An important focus of the Plan is to foster dune projects that can have both immediate and long-term shore protection, ecological, and aesthetic benefits, while also developing a feasible program in terms of design, permitting, funding, and maintenance. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hillsboro/Deerfield Beach Nourishment, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2019 (Estimated) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contract to provide coastal engineering and physical and biological monitoring services for the 2015 beach nourishment project in accordance with the regulatory permits. Laura Shepherd served as environmental project manager for permit compliance reporting in accordance with joint coastal permits. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Residences by Armani/Casa, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 (est.) 2018 (est.) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contract to conduct an initial permitting feasibility analysis and agency consultation to confirm the maximum feasible development envelope for the project design, which includes a large parking pedestal and tower with amenity/pool deck. Laura Shepherd served as environmental permit project manager to compile and process CCCL permit applications for the project. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Village of Key Biscayne Turtle Lighting Ordinance, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2012 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Development of turtle lighting ordinance working with Village staff and Village attorneys in accordance with FWC requirements . Preparation and participation in public workshops and assistance with establishment of turtle lighting inspection and enforcement program. Ms. Shepherd was the lead consultant in the development of the ordinance and coordinated with FWC for the review and approval of the final ordinance language. | Page 21 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 2 MANDATORY USE DATE OF FORM 6/2004 e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Varadero Development, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2022 (est.) 2022 (est.) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Provided services to obtain an FDEP CCCL permit for the large scale development project that includes a large parking pedestal with two residential towers and amenity/pool deck. Prior to application for an FDEP CCCL permit, M&N staff conducted an initial permitting feasibility analysis and consultation with agency staff to confirm the maximum feasible development envelope for the project design. M&N worked closely with the City of Sunny Isles Beach and Miami-Dade County to establish a preliminary beach fill project location/design. | Page 22 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Barbara Pederzoli, AIA Architect- Design Manager a. TOTAL b. WITH CURRENT FIRM 34 13 15. FIRM NAME AND LOCATION (City and State) REVUELTA ARCHITECTURE INTERNATIONAL (Miami, Florida) 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Architecture and Master of Science in Environmental Studies Registration No. 40700 Venezuela 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) LEED Accredited Professional 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Monte Carlo (Miami Beach, Florida) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2011 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Design Manager for 20-story residential condominium with 235,437 sq. ft. of gross area comprised of 136 residential units partially constructed eastward of the Coastal Construction Control Line at a cost of $34 million dollars. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ocean Terrace (Miami Beach, Florida) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Currently in progress (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Design Manager for 18-story hi-rise condominium with 496,000 sq. ft. of gross area and 102,200 sq. ft. of sellable area comprised of 58 residential units and 17,650 sq. ft. of retail space that will be partially constructed eastward of the Coastal Construction Control Line at a construction cost TBD. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Saxony Faena Hotel (Miami Beach, Florida) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Design Manager for 17-story Hotel with 260,000 sq. ft. of gross area and 190,417 sq. ft. of sellable area comprised of 169 hotel units and 14 residential units partially constructed eastward of the CCCL at a construction cost of $335 million dollars. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED L’Atelier (Miami Beach, Florida) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Design Manager for 18-story residential hi-rise condominium with 190,400 sq. ft of gross area comprised of 25 residential units and 5,142 sq ft. of retail space constructed partially eastward of the Coastal Construction Control Line with a construction cost of $41 million dollars. | Page 23 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Luis O. Revuelta, AIA Architect a. TOTAL b. WITH CURRENT FIRM 42 23 15. FIRM NAME AND LOCATION (City and State) REVUELTA ARCHITECTURE INTERNATIONAL (Miami, Florida) 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Architecture AR-7972 (State of Florida-Architecture) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) RA-012134 NCARB Certified State of Georgia Architect, former member of Coral Gables Board of Architects, former member of City o f Miami Planning Board and AIA Member 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Jade Beach (City of Sunny Isles Beach, Florida) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2006 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Architect of Record for a 52-story condominium hi-rise with 804,055 sq. ft. of gross area and 571,194 sq. ft. of sellable area comprised of 248 residential units partially constructed eastward of the Coastal Construction Control Line with a constructio n cost of $118 million dollars. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Monte Carlo (Miami Beach, Florida) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2011 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Designer and Architect of Record for a 20-story residential condominium with 235,437 sq. ft. of gross area comprised of 136 residential units partially constructed eastward of the Coastal Construction Control Line at a cost of $34 million dollars. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED L’Atelier Condominium (Miami Beach, Florida) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Designer and Architect of Record for a 18-story residential hi-rise condominium with 190,400 sq. ft. of gross area comprised of 25 residential units and 5,142 sq. ft. of retail space constructed partially eastward of the Coastal Construction Control Line with a construction cost of $41 million dollars. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 321 Ocean (Miami Beach, Florida) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Architect of Record for 10-story residential condominium with 135,000 sq. ft. of gross area and 62,577 sq. ft of sellable area comprised of 22 residential units constructed partially eastward of the Coastal Construction Control Line at a cost of $30 million dollars. | Page 24 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Erin C. Hodel Marine Environmental a. TOTAL b. WITH CURRENT FIRM 15 11 15. FIRM NAME AND LOCATION (City and State) CSA Ocean Sciences Inc., Stuart, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) MS, in Marine Biology N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Hodel is a marine biologist with over 15years of experience in marine environmental science. She is currently the Program s Director of the Ports, Harbors, and Beaches division at CSA Ocean Sciences. She has served as a Project Manager, Chief Scientist, and/or Field Scientist on a diverse range of marine environmental studies including benthic characterization and mapping, habitat damage assessment, and monitoring and restoration of coral reef, seagrass, and nearshore hardbottom habitats. She has extensive experience conducting long-term, multi-year biological monitoring programs for nearshore hardbottom in relation to beach nourishment projects, with lead roles in more than 10 long-term monitoring programs in Florida, including two projects in Broward County. In addition, she has strong experience conducting seagrass surveys and coral health assessments (including threated Acropora corals) in south Florida. Ms. Hodel has over 14 years of experience as a scientific diver with over 4,250 logged dives. She is a Rescue-Level SCUBA diver (PADI) with multiple specialty certifications. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami Harbor Sediment Tracing Study, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Ongoing N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Project Manager and Lead Field Scientist for a sediment tracer study conducted several years following construction of the Miami Harbor Dredging (Phase III) Project in order to examine sediment transport pathways and dominant oceanographic processes in the vicinity of Government Cut and the federal channel. Led all field aspects of the study, which included four rounds of sediment sampling in a 9-month period for tracers and other data collection on Middle and Outer Reefs and deployment and maintenance of moorings housing oceanographic equipment. Coordinated all GIS aspects of the study and display of tracer results in figures and co-authored all reports with teaming partners. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Coral and Seagrass Mitigation for the Miami Harbor Construction Dredging (Phase III) Project, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Field Scientist in large-scale coral and seagrass mitigation programs for the Miami Harbor Dredging (Phase III) Project. Member of team that successfully relocated over 800 stony corals, sea fans, and octocorals from the project footprint to natural reefs and a newly constructed mitigation reef. Participated in the post-transplantation monitoring of 115,000 seagrass plants successfully transplanted into a newly filled dredge hole north of the Julia Tuttle Causeway in Miami which created 17 acres of new seagrass habitat. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Broward County Outfall Coral Monitoring, Broward County, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. County Water and Wastewater Services North Regional Wastewater Treatment Plant in Pompano Beach. The monitoring surveys were initiated to monitor success of stony and soft corals relocated to the cover material on the outfall pipe following damage to benthic resources during maintenance dredging of the Hillsboro Inlet in 2002. Reference colonies were also tagged and monitored. CSA also reattached an additional 40 “corals of opportunity” (corals naturally detached from substrate due to bio-erosion or storms) to the cover material and performed monitoring surveys of these colonies as well as respective reference colonies as additional mitigation. | Page 25 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Nearshore Hardbottom and Coral Reef Monitoring for the Hillsboro/Deerfield Beach Nourishment Project, Town of Hillsboro Beach/City of Deerfield Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Field Scientist during a 5 year period to assess nearshore hardbottom habitat before, during, and after construction of a beach nourishment project on Hillsboro/Deerfield Beach, as well as coral reef habitat adjacent to borrow areas. Established permanent transects and collected close-up video and quadrat data to characterize and monitor hardbottom communities. Conducted health assessments of corals in response to potential project-related sedimentation and prepared weekly coral health reports during construction phase. Cost: $576,583. | Page 26 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE David B. Snyder Biologist a. TOTAL b. WITH CURRENT FIRM 35 31 15. FIRM NAME AND LOCATION (City and State) CSA Ocean Sciences Inc., Stuart, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) MS, Marine Biology/Ichthyology N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Organizations: American Academy of Underwater Scientists (AAUS); American Society of Ichthyologists and Herpetologists (ASIH) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Brevard County Mid Reach Beach Restoration Program, Brevard, Mid-Reach PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Ongoing N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Project Manager for Brevard County Mid Reach Beach Restoration Program hardbottom monitoring. Hardbottom epibiota and fishes are being monitored at four fill areas and one reference area off Brevard County’s Mid Reach. Monitoring data include quantitative photography and visual fish assessments. Data have been collected annually since 2013 to provide pre- construction information from which to assess potential impacts of the beach construction, which is expected for 2018. Also contributed to Uniform Mitigation Assessment Methodology analysis leading to design of a mitigation reef. Mitigation reefs were deployed during summer 2017 and monitored with quantitative photography and visual assessment. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Siesta Key Beach Nourishment Project, Phase II Hardbottom Monitoring Surveys, Sarasota County, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015-2016 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Field Scientist and Subject Matter Expert for multiyear monitoring program for the Siesta Key, Florida beach renourishment project. Assessment of nearshore and offshore hardbottom biological habitats before, during, and after construction. Key expert for scientific data collection, including collecting close-up photos, video, and in situ repetitive quadrat data to characterize the hardbottom biological communities. Co-authored multiple reports, led statistical analyses, and program design. Cost: $490,341. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Key Ecological Functions of East Florida Nearshore Hard Bottom and Artificial Reefs, Offshore, East Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2014 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Chief Scientist, Project Manager, Ichthyofaunal Expert, and Chief Statistician for an evaluation of ecological function and mitigation of nearshore hardbottom in southeast Florida. CSA managed a literature search and synthesis project to identify th e area’s key ecological functions of nearshore hardbottom. The synthesis examined functions of algae, invertebrates, fishes, and marine turtles. CSA worked with a multi-agency Technical Advisory Committee to investigate how specific ecological functions vary with respect to water depth in the nearshore environment. After the information gathering phase of the project, CSA conducted assessments of ecological function by sampling biota over time and across a gradient of water depths at artificial and natural hardbottom features in two areas of Palm Beach County: Singer Island and Ocean Ridge. The experimental design consisted of three categorical factors: depth, reef, and survey. During the six field surveys, epibiota were assessed for percent cover from 0.5 m-2 quadrats; macroalgae and associated invertebrates were suction-sampled for estimating species richness and abundance. Microhabitat use by newly settled fishes was assessed by visual survey and 0.3 m-2 photo quadrats, and newly settled fishes were captured with hand nets for identification. Visual transects for sea turtles were used to determine the presence/abundance of sea turtle species. In-depth statistical analysis accompanied the data in a comprehensive report. | Page 27 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Venice Beach Nourishment Project, Venice, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2013 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Chief Scientist and Project Manager responsible for successful completion of all tasks, data analysis, and reports for monitoring of hardbottom adjacent to fill and borrow areas for a beach nourishment project offshore Venice, Florida. The purpose of the monitoring program was to assess 1) how the equilibrium toe-of-fill for the proposed project performs compared with the predictions, and 2) possible direct and indirect impacts to biota. Hardbottom features that support epibiotic assemblages occurring near the offshore borrow sites and nearshore fill sites were monitored for impacts related to sedimentation, turbidity, and other dredge-related stressors. CSA also monitored proposed corridors for dredging pipelines prior to dredging to ensure the pipelines would not directly contact hardbottom and after dredging to document any impacts that may have occurred. In addition, CSA was responsible for pre-construction monitoring of shorebirds and migratory seabirds and their behavioral activity and nests. CSA evaluated the monitoring data and prepared reports that presented monitoring results and compared predicted versus actual impacts. CSA also monitored the nearshore artificial mitigation reef constructed offshore of Venice Beach for colonization and community stabilization following construction. Project Cost: $1,322,197. | Page 28 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Adam Crouch, PE Civil Engineer a. TOTAL b. WITH CURRENT FIRM 12 2 15. FIRM NAME AND LOCATION (City and State) Lake Mary, FL 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) B.S. Civil Engineering P.E., Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Crouch brings 12 years of transportation engineering experience, focusing on leading teams to develop, design, and permit stormwater systems for a variety of transportation and water resource projects including oversight and coordination of conveyance systems, stormwater management facilities, cost estimates, scheduling and budget tracking. He has produced construction plans for drainage design and provided review of construction plans and project documentation. Mr. Crouch has a strong relationship with the Florida Department of Transportation (FDOT) District 5 Drainage staff and understanding of general engineering consultant (GEC) contracts. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED RMK Merrill Stevens North Yard Redevelopment, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017 (est) 2017 (est) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Engineering design of shipyard redevelopment with Shiplift to accommodate vessels up to 200 feet in length. Marine structural design of Shiplift basin, hoist foundations, and 4 pile-supported transfer berths. Mr. Crouch is responsible for the stormwater management design that has included underground detention boxes to meet water quality requirements and has included the design of drainage wells. b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Alice Wainwright Park, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2019 (Est) 2020 (est) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Civil engineer for the design of the waterfront baywalk along with the design of 1,000 lf of replacement bulkhead along Biscayne Bay. Design coordinated with landscape architects for baywalk to meet Miami 21 requirements. Designed stormwater management to minimize impacts to public space and utilized green infrastructure design approach to minimize the required drainage systems and structures. c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED SJRWMD Continuing Construction Management and Design Services PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2011 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Prepared bid and permit documents for various projects including Crane Creek Dredging, Lake Washington Breach Repair and Vessel Access, and C-1 Canal Pump Stations. Continuing construction management and engineering services have been provided to SJRWMD for various projects that involve the restoration of wetlands and other water bodies, flood protection, erosion control, project design and design reviews, survey, and geotechnical investigations and materials testing. d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED FDOT District 2 – NPDES Inspection Services, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2013 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Performed stormwater facility inspections for the District 2 National Pollutant Discharge Elimination System (NPDES) Inspecti on Services Contract. The inspections included identification of operation and maintenance problems, recommended design changes to correct deficiencies, and design of corrections if requested. e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED S-39A Culvert Automation and Improvements, South Florida Water Management District, Palm Beach County PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2014) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Civil engineer-of-record for this project to replace the existing three 72-inch pipe culverts with an automated gated structure with two 8’ x 10’ barrels, including a new control building, sheet pile wingwalls, two stilling wells, and mechanical and electrical components. Responsible for civil design and site layout, project coordination, assembly of the specification package, and design report documentation | Page 29 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Craig C. Clevenger, PG Environmental Engineering a. TOTAL b. WITH CURRENT FIRM 26 17 15. FIRM NAME AND LOCATION (City and State) EE&G Environmental Services, LLC Miami Lakes, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science, Comprehensive Geology Southwest Missouri State University, Springfield,; Graduate Studies in Advanced Hydrogeology, University of Missouri, Columbia Florida Professional Geologist: Florida # PG1666 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 1993/40-Hour OSHA Hazmat Training; 1996/8-Hour OSHA Supervisor Hazmat Training; FDEP 24-Hour Oil Spill Prevention, Response, Control & Cleanup, 1990 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Environmental Due Diligence and Source Removal to Address Former Underground Storage Tank (UST) Petroleum Discharge & Solvent Discharge, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Project Director to conduct Phase I and Phase II ESA assessment prior to acquisition. Based on the due diligence assessment, two source areas were identified, including a former UST petroleum discharge area and a separate solvent discharge area. EE&G conducted source removal soil excavations, added in-situ chemicals to aid in natural attenuation of the residual impacts, and post-excavation groundwater monitoring. The client required expedited due diligence to complete the Phase I and Phase II ESA prior to acquisition, and the expedited excavation of petroleum and solvent affected soils from source areas to facilitate the redevelopment into a concrete plant. b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Environmental Due Diligence Assessments, Tank Removal, and Site Assessment, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Project Director. Phase I ESAs were prepared in accordance with the requirements set forth in the American Society of Testing and Materials (ASTM) Practice Designation E 1527-13. The Phase II ESAs were prepared in general accordance with ASTM 1903-11. The information and conclusions presented in the Reports were subject to inherent limitations identified in the ASTM E 1527-13 and ASTM E1903-11 guidelines. The two regulatory reports, TCAR and SAR, were prepared in accordance with Chapter 62-761, Florida Administrative Code (FAC) and Chapter 62-780, FAC, respectively. c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Lead Impacted Soil (Source) Removal, Assessments, and Reports, 19th Street Lead Superfund Site, 3626 19th Street North, St. Petersburg, Pinellas County, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Project Director. This source removal was completed under the Quality Assurance Project Plan (QAPP) submitted to the USEPA in November 2016, the QAPP and associated Work Plan summarized cleanup procedures to the USEPA. The QAPP and Work Plan were reviewed and approved by the USEPA prior to the implementation the source removal project. The primary objective of the project was to remove lead-contaminated soils exceeding 400 parts per million (ppm) at the residential property to meet the eligibility criteria for lead contaminated soil. Based on the excavation, transport and off-site disposal of the identified lead impacted soils, as well as the confirmation laboratory analytical sampling and field XRF sampling surrounding the residential building | Page 30 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) March 2018 l Page 2 of 2 d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED South Florida Affordable Housing Developer Portfolio, Broward, Miami, and Palm Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Ongoing N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Project Director. Environmental consulting services, including environmental due diligence services (Phase I ESAs, Phase II ESA, Asbestos-Containing Building Material Surveys, Lead-Based Paint Assessments, Indoor Air Quality and Mold Assessments), regulatory-driven environmental services (Site Assessment Reports, Remedial Action Plans, Source Removal, Tank Closure Assessments, Groundwater Monitoring Only Plans, and Engineering Control Verification), Brownfields Consulting Services, and mold-abatement services. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm. | Page 31 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Arvind Kumbhojkar, Ph.D., P.E., F. ASCE Geotechnical a. TOTAL b. WITH CURRENT FIRM 25 15 15. FIRM NAME AND LOCATION (City and State) HP Consultants Inc. Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) Ph.D., Civil Engineering Florida, Civil Engineering 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Authored more than 30 peer-reviewed publications - technical papers in the journals and publications of ASCE, ASTM, Canadian Society of Civil Engineers, ITE,proceedings of international conf. and research reports, and more than 150 consulting reports. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Misc. Marine & Coastal Engineering Services, City of Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Ongoing N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Geotechnical consultant to Moffat & Nichol for multi-year contract: services for Spring Garden Point & Wainwright Parks and monitoring offshore screw pile installation at Dinner Key & Marine Stadium. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Soils, Foundations and Material Testing Services for Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2008-2018 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Geotechnical services for an on-call basis for the last ten years, with three renewals. More than 25 projects for field investigation, lab testing, foundation analysis and design, design & construction recommendations, reports. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Engineering Services for Traffic, Roadway, and Civil Engineering Services, Broward County, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Geotechnical services for more than 20 projects since 2016: field investigation; lab testing; foundation analysis and design; design and construction recommendations; reports. CEI including drilled shaft certificate, as a sub consultant. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. | Page 32 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE John D. Riege, P.E., P.G. Geotechnical a. TOTAL b. WITH CURRENT FIRM 25 5 15. FIRM NAME AND LOCATION (City and State) HP Consultants Inc. Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) BS, Geological Engineering MS, Coastal/Ocean Engineering Professional Geologist, Florida; Professional Engineer, Civil, Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) ● State of Florida, Water Well Drilling Contractor ● OSHA HazMat Safety 40 hours Level B ● OSHA Construction Safety 10 hours 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Misc. Marine & Coastal Engineering Services, City of Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Ongoing N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Geotechnical consultant to Moffat & Nichol for multi-year contract: services for Spring Garden Point & Wainwright Parks and monitoring offshore screw pile installation at Dinner Key & Marine Stadium. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Soils, Foundations and Material Testing Services for Miami- Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2008-2018 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Geotechnical services for an on-call basis for the last ten years, with three renewals. More than 25 projects for field investigation, lab testing, foundation analysis and design, design & construction recommendations, reports. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Engineering Services for Traffic, Roadway, and Civil Engineering Services, Broward County, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Geotechnical services for more than 20 projects since 2016: field investigation; lab testing; foundation analysis and design; design and construction recommendations; reports. CEI including drilled shaft certificate, as a sub consultant. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. | Page 33 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE John R. Morgan, II, PLS Surveying a. TOTAL b. WITH CURRENT FIRM 40 32 15. FIRM NAME AND LOCATION (City and State) Morgan & Eklund, Inc. Vero Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) BA, Environmental Science, University of Virginia Survey Technology, Penn State Registered Land Surveyor, 1976/PA/RLS/#26134-E Professional Land Surveyor, 1979/FL/PLS/#3520 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Morgan has forty years’ experience in land and hydrographic surveying. His areas of expertise include hydrographic, (single beam & multi-beam surveys) topographic, boundary and control surveys in rivers, bays, lakes, the Atlantic Ocean, the Gulf of Mexico, navigation channels together with levee and overbank surveys. John has directly supervised all of the survey tasks associate d with large-scale topographic and hydrographic survey projects for beach nourishment, Everglades Restoration projects and channel and harbor improvement projects. John is also responsible for the day-to-day management of the company, including project scheduling, client contact, quality control and supervision of personnel. Member of FSMS, FSBPA, NSPS, ASBPA and THSOA. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Capron Shoal, St. Lucie County, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2013 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Project Manager, Chief Surveyor for a Cultural Resource Investigation & Geophysical Survey of the offshore borrow area located at Capron Shoal. Performed Side Scan Sonar, Seismic and Magnetometer surveys. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Curry Hammock State Park and Ft. Zachary Taylor Historic State Park, Florida Keys, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2013 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Project Manager, Chief Surveyor. The FDEP, Division of Recreation & Parks require current beach profile surveys for these two parks. The beach profiles were to document the current state of two erosion control project area beaches and were done to calculate sand volumes in support of storm recovery or future nourishment events. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Intracoastal Waterway Multi-Beam Survey, Brevard County to Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2014 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Project Manager, Chief Surveyor for a Multi-Beam Swath Bathymetric Survey of the Atlantic Intracoastal Waterway from Sebastian Inlet, Indian River County to the southern end of Miami-Dade County. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Post Isaac Coastal Monitoring, Collier County, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2013 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Project Manager, Chief Surveyor for a physical monitoring survey and assessment of the coastal environment due to the effects of Hurricane Isaac on the beaches of Collier County. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami Beach Hotspots Renourishment Project, Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Project Manager - Chief Surveyor: Provided field & office survey personnel to assist the USACE in calculating the amount of beach-fill being placed onto Miami Beach. Verified existing horizontal and vertical control, performed beach profiles and a topographic survey. | Page 34 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE James Schoonmaker Construction Estimating a. TOTAL b. WITH CURRENT FIRM 37 4 15. FIRM NAME AND LOCATION (City and State) Tampa, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) BS, Building Construction N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Schoonmaker is a marine construction specialist with more than 37 years of experience in construction management and construction estimating for numerous heavy civil marine waterfront facilities located throughout the Eastern Seaboard, Gulf Coast of the United States, Central America, and the Caribbean. As a project engineer and cost engineer, Mr. Schoonmaker has been directly involved with onsite construction activities, and was chief estimator for a major maritime constructor for 10 years. For the last 9 years, Mr. Schoonmaker has provided constructability assessments and costing used in the design engineering in dustry and worked as an Owner’s Representative for the construction of cruise terminals and a multi-use bulk and container terminal. Mr. Schoonmaker estimated projects for tender up to $150 million and concept pricing for projects up to $750 million. Projects have included bulkheads, piers, offshore berths, marginal wharves, marine discharge and intake outfalls, bridges, mechanical dredging, and shoreline protections. Proposal types included joint ventures, design-build, fixed price, FIDIC (International Federation of Consulting Engineers), re-measurable, and negotiated bids. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Dinner Key North Mooring Field, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 (Est.) 2019 (Est.) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contracted for the design and permitting of a public managed mooring field, along with associated channel realignment and motorized vessel exclusion zones. Managed the marine resource and hydrographic surveys conducted, and the mooring field layout was established based on minimum water depths required to protect water quality. Assisted with update to the Mooring Field Management Plan. Includes waterway marker and boating restricted zone permitting with the USCG and FL Fish & Wildlife Conservation Commission. Mr. Schoonmaker assisted the project team in the development of construction cost estimates for this unique marine construction. . b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hillsboro/Deerfield Beach Nourishment, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2021 (Estimated) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Provided coastal engineering and physical and biological monitoring services for the 2015 beach nourishment project in accordance with the permits. Designed and secured permits for a 33,700 c.y. truck haul beach nourishment event built in 2018. Mr. Schoonmaker provided QA/QC of the marine works construction cost estimates. . c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Holland Tunnel Piers 9 and 204 Reconstruction, Jersey City, New Jersey PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2014 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Cost estimator for the demolition and reconstruction of the Holland Tunnel Piers 9 and 204 for the Port Authority of New York and New Jersey. This $50M project included the demolition of over 90,000 square feet of timber pile supported pier and the installation of two pile-supported two approach piers and a pile supported apron around the existing Holland Tunnel Ventilation Building. The project included the installation of approximately 62,500 lf of steel pipe pile supporting 69,600 sf composite precast and cast in place deck d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED RMK Merrill Stevens North Yard Redevelopment, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 (est) 2018 (est) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Engineering design of shipyard redevelopment with Shiplift to accommodate vessels up to 200 feet in length. Marine structural design of Shiplift basin, hoist foundations, and 4 pile-supported transfer berths. Mr. Shcoonmaker has provided construction cost estimating support to the project team. | Page 35 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 2 MANDATORY USE DATE OF FORM 6/2004 e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Key Biscayne Beach Management PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2020 (Est.) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Completed the design, permitting and construction administration for a 26,000 cubic yard truck haul beach nourishment along 6,000 feet of shoreline. Physical and biological monitoring is ongoing to confirm compliance with environmental permit conditions. Mr, Schoonmaker has provided QA/QC of the construction cost estimates compiled by the project team | Page 36 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Nicole VanderBeke, P.E. GIS a. TOTAL b. WITH CURRENT FIRM 13 13 15. FIRM NAME AND LOCATION (City and State) Raleigh, NC 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) B.S. Civil Engineering P.E., North Carolina 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. VanderBeke provides engineering and GIS support for various water resources and coastal engineering projects. She is well- versed in the use of GIS databases to store, manage, and present watershed and coastal data and characteristics. She has worked extensively with the Spatial Analyst and 3D Analysts extensions in ArcGIS to perform both 2D and 3D analysis. She has used ArcGIS to build databases, assist in stormwater drainage planning, provide floodplain mapping support, assess shoreline and beach volume changes, and develop inputs for various hydraulic and coastal models such as EPA SWMM, HEC-RAS, MIKESHE, MIKE11, and GENESIS. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hillsboro/Deerfield Beach Nourishment, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017 (est) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Contract to provide coastal engineering and physical and biological monitoring services for the 2015 beach nourishment project in accordance with the regulatory permits. Designed and secured permits for a 33,700 c.y. truck haul beach nourishment event built in 2018. Ms. VanderBeke consulting on data collection for coastal numerical modeling relative to downdrift impacts from groin structures. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Lockwood Folly Habitat Restoration – Dredging of the Eastern Channel, Oak Island, North Carolina PROFESSIONAL SERVICES CONSTRUCTION (if applicable) ongoing 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Coastal engineer tasked with construction administration for the dredging of Eastern Channel, placement of beach compatible material on Oak Island, and disposal of non-compatible material on Horse Island. Helped develop the front end documents, technical specifications, and construction plans for the project. Led weekly progress meetings at the project site with the dredging contractor and Town of Oak Island officials to facilitate discussion on work completed and upcoming work as well as address any questions or issues from the contractor or Town and discuss any changes to the original construction plans. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Carolina Statewide Beach and Inlet Management Plan PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2014 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Assisted the development of a comprehensive beach and inlet management plan (BIMP) identifying potential strategies to maintai n beach and inlet characteristics at levels determined from analysis of historic, current, and forecasted future positions and comp osition. Gathered data (beach profile & bathymetric surveys, wave, tide, storm, aerial photography, historic shoreline positions, geologic (sed iment), sediment budgets) and created and populated a statewide beach nourishment GIS database providing nourishment location, date, extent, quantity, source, total project cost, project sponsor, and method of material delivery to site (pipeline, hopper dredge, etc.). Also created and populated a statewide coastal structures GIS database recording location, orientation, and structure type. Using these data, she analyzed erosion rates, potential offshore sediment sources, shoreline development and beach management practices. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Oceanview Shoreline Maintenance Plan, Norfolk, Virginia PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2011 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Coastal engineer who developed a GIS database of all historical aerial photography, shoreline position, and survey data that had been collected for previous City of Norfolk projects. Developed a database of historical profile volume change data from which background erosion rates were determined by removing the effects of nourishment projects from the historical volume change data. Oversaw long-term shoreline modeling in GENESIS and short-term profile storm response modeling in SBEACH for use in developing a master plan for the City e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sandbridge Beach Public Access Inventory, Virginia Beach, Virginia PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2008 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. Performed an inventory of over 100 public beach accesses on Sandbridge Beach. Developed a GIS database which showed the location of each access and provided links to site visit photos and comments about each access | Page 37 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Residences by Armani/Casa, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016 2018 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER RDR Seashore, LLC Eric Fordin 786-402-0807 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Residences by Armani/Casa project is a 56-story high- rise oceanfront condominium project in the City of Sunny Isles Beach, Florida. Moffatt & Nichol (M&N) conducted an initial permitting feasibility analysis and agency consultation to confirm the maximum feasible development envelope for the project design, which includes a large parking pedestal and tower with amenity/pool deck. M&N worked with the Owner to develop a permitting strategy that was coordinated with the overall Project development schedule. M&N worked with the design team to produce project plans in compliance with the appropriate regulations, and processed/secured a Florida Department of Environmental Protection (FDEP) Coastal Construction Control Line (CCCL) Permit for this 3.1-acre development. The project includes a significant below-grade parking garage, and the permit negotiations included authorization of the associated excavation and management of sandy material seaward of the CCCL and partial demolition of the existing seawall structure onsite. M&N worked closely with the City, Miami-Dade County, and FDEP to secure approval of a sand management plan that includes the construction of a vegetated dune seaward of the site and placement of approximately 36,000 c.y. of sand in a local truck haul beach maintenance project. This nourishment project will facilitate beach management in the City. A site-specific 30-year erosion projection setback analysis was also completed and approved by the FDEP CCCL Engineering Section to optimize siting of the garage pedestal. M&N also guided the design team relative to compliance of proposed structures with Sections 3109 (Coastal Construction) and 1612 (Flood) of the Florida Building Code. M&N is coordinating exterior lighting approval with compliance with Florida Fish and Wildlife Conservation Commission marine turtle protection regulations. RELEVANT FEATURES  FDEP/CCCL Permitting  Oceanfront Seawall Inspection  Truck Haul Beach Nourishment Design  Upland Sand Source Evaluation  Joint Coastal Permitting  City/County/Corps/FDEP Coordination 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Moffatt & Nichol Miami, FL Prime b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Morgan & Eklund Vero Beach, FL Subconsultant | Page 38 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Hillsboro/Deerfield Beach Nourishment, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2019 (Estimated) 2018 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Town of Hillsboro Beach Mac Serda 954-427-4011 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Moffatt & Nichol (M&N) is providing physical and biological monitoring services for the Town of Hillsboro Beach’s 2015 beach nourishment project in accordance with the regulatory permits. Monitoring services include coordinating tilling prior to marine turtle nesting season. Physical monitoring includes comprehensive beach profiles along with shoreline erosion/accretion evaluations and volume comparisons. Engineering reports are compiled summarizing the performance of the beach nourishment project on an annual basis. M&N is managing the biological monitoring required for the project, including nearshore hardbottom mapping along with transects in accordance with the approved biological monitoring plan. Physical and biological monitoring reports are compiled on annual basis and submitted to the U.S. Army Corps of Engineers (Corps), Florida Department of Environmental Protection (FDEP), and Broward County Environmental Protection and Growth Management Department (EPGMD) for environmental permit compliance. In addition, M&N is providing coastal engineering consulting services to help the Town address downdrift erosion from groin fields in Deerfield Beach. M&N performed a post-storm assessment of the beaches after Hurricane Mathew impacted the Town in October, 2016. Beach profiles were performed and an erosion summary prepared. M&N prepared preliminary beach nourishment plans for restoration of the northern portion of the Town’s shoreline based on the estimated erosion. The firm consulted with the Federal Emergency Management Agency on behalf of the Town to obtain approval of the Public Assistance as an Engineered Beach to provide federal reimbursement for design, construction and monitoring of the planned truck haul nourishment (38,000 cubic yards of material). M&N completed the environmental permitting through the Corps, FDEP and EPGMD and assisted the Town with the construction bidding process on an accelerated schedule after additional erosion occurred due to Hurricane Irma. Construction of the truck haul beach nourishment was completed in March, 2018, and continued physical/biological monitoring of the project will be provided by M&N. Pho RELEVANT FEATURES  Physical Monitoring  Biological Monitoring  FDEP/JCP Compliance  Coastal Structure Studies  Truck Haul  Beach Nourishment  Alternative Sand Sources 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Moffatt & Nichol Miami, FL Prime b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Morgan & Edlund Vero Beach, FL Subconsultant c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CSA Ocean Sciences Delray Beach, FL Subconsultant | Page 39 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Key Biscayne Beach Management, Key Biscayne, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2019 (Estimated) 2019 (Estimated) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Village of Key Biscayne John Gilbert 305-356-5514 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) While at a previous firm, Tim Blankenship, Christy Brush, and Yong Chen designed, permitted, and supervised beach management projects including: Beach Nourishment (2002): The project expanded the beach and created a dune, which required approximately 120,000 cubic yards of sand obtained from an offshore borrow area. Marine resource and hydrographic surveys conducted, along with sand source search, jet probes, vibracores, and marine archeological surveys were conducted. The newly constructed dune was vegetated with a variety of native dune species and now connects the dune systems of the State and County parks north and south of the project site. Construction took place in 2002, and construction administration services were provided. Physical monitoring was conducted for the project, and the biological monitoring was provided by Miami -Dade Division of Environmental Resources Management (DERM). From 2007 to 2009, Tim and Christy also worked with the Village and the environmental permitting agencies to resolve impacts to approximately 0.62 acre of seagrass bed that resulted from movement of the dredge pipeline during construction. CSA Ocean Science completed the mitigation. Truck-haul Beach Dune Repair (2008): This project was undertaken due to hurricane impacts in 2004 and 2005. The dune repair project involved placing sand from an upland sand mine on approximately 1,000 feet of beach in two hot spot areas. Sand source alternatives were reviewed, and construction staging plans were developed. Tim worked closely with the Village to coordinate for funding reimbursement from FEMA. Marine Turtle Protection Ordinance (2009): Christy and Laura Shepherd additionally consulted with the Village to educate their staff relative to enforcement of their Marine Turtle Protection Ordinance, which included surveys of oceanfront properties for lighting compliance to prevent nesting and hatchling turtle disorientation. Tim and Laura participated in public workshop s and worked with the Village attorneys in drafting the turtle lighting ordinance. Truck-haul Beach Nourishment (2012): Design and permitting of a truck haul beach nourishment project with approximately 37,500 cubic yards of sand from an upland mine. Assisted Village with fast-track procurement process utilizing previously bid construction unit prices from another municipality. Yong Chen was coastal project engineer for the design of the beach nourishment. Provided Resident Project Representative (RPR) and construction surveys throug hout the project construction. Provided physical and biological reporting. This project was also funded by FEMA. Moffatt & Nichol (M&N), as a subconsultant to EAC Consulting, Inc., provided coastal engineering and environmental permitting services for the 2017 truck haul beach nourishment in the Village of Key Biscayne, Florida. The Village was impacted by Hurricane Matthew in October, 2016, with extensive beach erosion that extended into the coastal dunes. Beach profiles were conducted to assess the storm impacts, and a maintenance beach nourishment project designed. The design required Equilibrium Toe of Fill (ETOF) estimated to optimize the beach fill template design along 6,000 feet of shoreline. A coastal engineering analysis was performed utilizing two independent methods to estimate the ETOF to avoid impacts to adjacent nearshore seagrass beds. Prior to construction, M&N coordinated and managed updated biological mapping of the adjacent seagrass beds as well as monitoring transects along the from the project limits to include control transects outside of the project area. This data was utilized along with beach profile surveys to design the beach fill template. Construction plans and specifications were compiled, and M&N assisted the Village with procuring a qualified construction contractor on an expedited schedule. M&N provided construction administration services for the duration of the project in 2017 for conformance with plans, specifications, and permit conditions. Pre- and post-construction profile sections were reviewed and volumes estimated to verify beach fill quantities as construction progressed. M&N prepared the post-construction engineering report required by the environmental agencies for permit compliance. | Page 40 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 2 MANDATORY USE DATE OF FORM 6/2004 M&N processed the maintenance project environmental permit authorizations through the U.S. Army Corps of Engineers, Florida Department of Environmental Protection, and Miami-Dade County Department of Environmental Resources Management. The Village has existing 10-year federal, state, and local environmental permits that facilitate beach maintenance projects. Beach nourishment plans, as well as updated monitoring and construction methodologies, were processed through the agencies. Construction extended a few weeks into marine turtle nesting season in Miami-Dade County; M&N managed the daily nesting surveys required prior to the season and extending into the nesting season. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Moffatt & Nichol Miami, FL Prime b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Morgan & Eklund Vero Beach, FL Subconsultant c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CSA Ocean Science Miami, FL Subconsultant | Page 41 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Hollywood Dune Master Plan, Hollywood, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 (Estimated n/a 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Hollywood Susan Goldberg 954-924-2980 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Hollywood (City) Beach Community Redevelopment Agency retained Moffatt & Nichol to prepare a Dune Master Plan (Plan) that addresses dune maintenance and creation goals of the of March 15, 2017, Hollywood Sustainability Action Plan. The Plan outlines a management approach that addresses both improvements to existing dune features and new dunes / vegetation. The entirety of the City beach was evaluated and the dunes categorized by physical/geographic characteristics and existing condition. The management approach was developed utilizing information obtained through onsite reconnaissance, input from City officials and staff, and initial regulatory agency outreach. An important focus of the Plan is to foster projects that can have both immediate and long-term benefits, while also developing a feasible program in terms of design, permitting, and maintenance. In general, the Plan focuses on the initial goals outlined below:  Differentiate management zones based on current beach/dune features and adjacent upland use  Prioritize new dune locations for storm protection, enhanced ecology/aesthetics, and increased property values  Provide typical topographic design profile for new dunes  Establish native salt-tolerant vegetation Recommended Palette for dune planting  Provide recommendations for further action items, studies, and/or assessments  Evaluate potential to “bank” mitigation credit with the Florida Department of Environmental Protection (FDEP) for completed dune restoration projects and maintain new dunes in their permitted templates  · Discuss FDEP permitting instruments for Plan implementation 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Moffatt & Nichol Miami, FL Prime | Page 42 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Dinner Key North Mooring Field, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 2019 (Estimated) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Miami Andrew Schimmel 305-416-4157 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Dinner Key North Mooring Field consists of 25-moorings along with associated channel realighmnet and vessel exclusion zones. M&N managed the marine resource and hydrographic surveys conducted, and the mooring field layout was established based on minimum water depths required for mooring of vessels as stipulated Miami-Dade County Department of Envornmental Resources Management (DERM). The area has long been utilized as an unregulated anchorage, and the managed mooring field will facilitate the enforcement by City of Miami and other authorities to minimize the presence of derelict vessels. Environmental permits are being processed by M&N fhrough DERM, Florida Department of Environmental Protection (FDEP) and the U.S. Army Corps of Engineers. For the mooring field, permits are also being processed through the Florida Fish and Wildlife Conservation Commission (FWC) as well as the U.S. Coast Guard. A geotechnical investigation was performed by HP Consultants consisting of jet probes along with anchor pull testing of the proposed helical anchors for the moorings. They mooring field is designed by M&N with these helical anchors to minimize environmental impacts to the seagrass beds, and therefore the project is considered “self mitigating” by the regulatory agencies. The moorings consist of a “Stormsoft” downline with appropriate mooring buoy and pennant. The project is being partially funded by the Florida Inland Navigation District (FIND) with the initial phase of the grant for design/permitting and the second phase of the grant for construction. Environmental permits are being processed, with construction of the mooring field anticipated in 2019. RELEVANT FEATURES  Geotechnical Investigation  Hydrographic Surveying  Marine Resource Mapping  FDEP, DERM and Corps of Engineers Permitting  FIND Grant Project  Marine Works Engineering – Mooring Field  Design – addresses derelict vessels 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Moffatt & Nichol Miami, FL Prime b. HP Consultants Miami, FL Subconsultant | Page 43 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State) Miami Beach Hotspots Renourishment Project Miami-Dade County, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (if Applicable) n/a 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Eastman Aggregate Enterprises LLC b. POINT OF CONTACT NAME Mr. Sean Kemnuir c. POINT OF CONTACT TELEPHONE NUMBER 561-969-7147 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Morgan & Eklund, Inc. provided pre- and post- construction surveys for Eastman Aggregate Enterprises LLC who was under contract with the US Army Corps of Engineers together with the City of Miami Beach and Miami-Dade County as part of the Miami Beach Hotspots Beach Renourishment Project. Initially our field crews verified horizontal and vertical control monuments and set additional control points as required for RTK basestations. Additionally, our firm provided construction staking for fill placement and pre-and post-fill cross sections to determine fill volumes. We also performed offshore pre-fill cross-sections at the 55th Street and 46th Street Hot Spots utilizing our 26’ Parker Survey Boat and computed volumes with template and specifications. Our survey crews set grade stakes for fill placement within the design template and collected elevation data along cross-sections spaced at 100’ intervals before fill and immediately after fill to compute pay volumes. Fees $163,032.50 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Morgan & Eklund, Inc. (2) FIRM LOCATION (City and State) Vero Beach, FL (3) ROLE Surveyor STANDARD FORM 330 (6/2004) PAGE 3 | Page 44 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Jade Beach, City of Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2006 2008 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Fortune International Celina Vazquez 786.295.4595 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Architect of Record for a new 52-story residential high-rise condominium with over 800,000 sq. ft of gross area with 541,194 sq. ft. of sellable area comprising of 248 residential units and constructed at a cost of about $118 million dollars. The Building included such amenities as a sunrise pool and a sunset pool, children play room, fitness center and spa, saunas, business center, media room, pool bar, and private storage rooms. The building is located on an ocean front property overlooking the Atlantic Ocean in the City of Sunny Isles Beach, Florida and was partially constructed eastward of the Coastal Construction Control Line (CCCL); as such, the structural design complies with the following RELEVANT FEATURES:  Meets the Parallel Shore requirements for coastal construction for structures located east of the Coastal Construction Control Line (CCCL).  Breakaway walls for construction below the wave crest elevation.  Sand displacement regulations for excavation material eastward of the (CCCL) and negotiated with State and City for relocation of sand  Sand dune restoration (fill) plans including dune enhancement of vegetative material and coordination with governing authorities during design and overview of fill activities  Wave crest elevation for habitable areas.  Breakaway design of lightweight beach structures including paved areas, cabanas, tiki huts located within the 30 years projected Erosion Control Line.  All Ground floor slabs that could or would be subjected to flooding during the 100 year flood event are designed to be watertight with provisions to resist the hydrostatic uplift pressures or alternatively be allowed to flood under worst-case conditions.  Provisions were made to keep ground floor control systems (electrical transformers, etc…) from becoming compromised from flood waters.  The augercast pile foundations were used to provide uplift resistance to the ground floor slabs.  Adequate water proofing was provided on the underside of the ground floor slabs and behind below grade walls to prevent water damage and intrusion. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Revuelta Architecture Miami, FL Architect | Page 45 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Environmental Due Diligence Assessments, Tank Removal, and Site Assessment Megan Holdings, LLC and Mapton Holdings, LLC NW 2nd Avenue and NW 22nd Lane, Miami, FL 33127 PROFESSIONAL SERVICES CONSTRUCTION (if applicable) May – August 2017 N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Mana Wynwood David Lederman, Vice President 305-305-5474 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) As Prime Contractor, EE&G Environmental Services, LLC (EE&G) has completed the following environmental due diligence reports for the above referenced Property:  Phase I Environmental Site Assessment (ESA)  Phase II ESA  Expanded Phase II ESA  Tank Closure Assessment Report (TCAR)  Site Assessment Report (SAR) The Reports were prepared for Mana Wynwood (the Client). The Phase I ESAs were prepared in accordance with the requirements set forth in the American Society of Testing and Materials (ASTM) Practice Designation E 1527-13. The Phase II ESAs were prepared in general accordance with ASTM 1903-11. The information and conclusions presented in the Reports were subject to inherent limitations identified in the ASTM E 1527-13 and ASTM E1903-11 guidelines. The two regulatory reports, TCAR and SAR, were prepared in accordance with Chapter 62-761, Florida Administrative Code (FAC) and Chapter 62-780, FAC, respectively. EE&G has developed a remedial strategy to removal another set of USTs that are currently obstructed by a utility corridor, and address petroleum-affected groundwater using in-situ chemical attenuation. The remedial activities will facilitate the site preparation and eventual construction of a mid-rise retail shopping plaza and condominium in the Wynwood Arts District of Miami, Florida. RELEVANT FEATURES  EE&G conducted separate Phase I and Phase II ESAs concurrently to assist in evaluating potential environmental concerns within an expedited due diligence timeframe.  A set of USTs were found and EE&G was able to quickly permit and remove the tanks to keep the project on-track.  Through the use of in-house resources and the minimization of subcontract services, we were able to maintain strict quality control and deliver responsive, cost-effective consulting services 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE EE&G Environmental Services, LLC Miami-Dade County, FL Prime Consultant | Page 46 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Nearshore Hardbottom Monitoring Surveys for the Martin County Shore Protection Project, Marting County, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018 2013 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Martin County Kathy Fitzpatrick 772-288-5429 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) CSA conducted a baseline pre-construction survey in 2010, an immediate post- construction survey in 2013, and four annual post-construction surveys from 2014 to 2017 to characterize, monitor, and map nearshore hardbottom habitats offshore Martin County, Florida in relation to beach nourishment associated with the Martin County Shore Protection Project. Surveys were conducted in accordance with a biological monitoring plan approved by Florida Department of Environmental Protection (FDEP). Twelve permanent, cross-shore monitoring transects were established from the project’s equilibrium-toe-of-fill (ETOF) to the east a distance of 152 m. CSA scientists collected quantitative and qualitative video data along each transect. Percent cover of substrate, wormrock, macroalgae, corals, sponges, and other benthic fauna were determined from analysis of quantitative video data using random point count software (CPCe). Along each transect, percent cover of substrates, wormrock, macroalgae, corals, sponges, and other benthic fauna were also visually estimated in situ by sampling 0.25- m2 quadrats at up to 12 point-intercept locations. Within each quadrat, individual counts were made of all corals, sponges, tunicate colonies, urchins, and holothuroids; maximum and mean heights of the two dominant algal species were measured; and maximum vertical relief of hardbottom was measured. Sediment accumulation was measured at five random locations within each quadrat and at each meter along the length of each transect. The nearshore edge of exposed hardbottom was mapped by divers to document position relative to the shoreline and to characterize the benthic community along the edge within the survey area. Comprehensive annual biological monitoring reports and data deliverables (including GIS mapping products) were submitted to the client pursuant to FDEP Joint Coastal Permit application requirements. This project was conducted as a subcontract to Taylor Engineering, Inc. and Ecological Associates, Inc. Annual Project Cost: $112,000 to $135,000. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CSA Ocean Sciences Inc. Stuart, Florida Nearshore Hardbottom Monitoring | Page 47 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Seagrass Restoration In Biscayne Bay – Miami Dade County, Key Biscayne, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 2009 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Village of Key Biscayne John Gilber 305-365-5514 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) CSA was contracted by the Village of Key Biscayne (VKB) to develop and implement a seagrass restoration and mitigation plan to satisfy the Florida Department of Environmental Protection (FDEP) special conditions requiring seagrass mitigation to offset authorized and unauthorized impacts to seagrass from beach nourishment projects. CSA conducted hydrographic surveys using shallow water hydrographic survey systems and telemetry to identify and map over 2 acres of seagrass injuries and blowholes for potential restoration and to locate donor seagrass beds. CSA directly restored over 1.0 acre of seagrass injuries using structural augmentation (sediment addition), seagrass planting, and fertilization (bird stake placement to encourage natural seagrass in-growth). CSA obtained the necessary state and federal permits, designed the mitigation approaches, and developed the mitigation and monitoring plans for approval by regulatory agencies. The standard methodologies employed were developed by Florida researchers and practitioners and are published in the Final Programmatic Environmental Impact Statement for Seagrass Restoration in the Florida Keys National Marine Sanctuary (FKNMS). It is anticipated that the indirect benefits to the seagrass habitat encompass a much larger acreage and will continue to provide critical ecological services in perpetuity, in absence of further impacts. CSA also conducted the long-term monitoring program, performing multiple surveys of the seagrass planting sites from 2008 through 2015. CSA scientists conducted Braun-Blanquet quadrat surveys of selected mitigation and reference sites. Based on 60 months o f monitoring, the seagrass restoration exceeded success criteria with >30% density and >60% seagrass coverage. Finally, in 2015, CSA removed all bird stakes associated with the project. Total Project Cost: $637,902. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE CSA Ocean Sciences Inc. Stuart, Florida Construction, Deployment, Monitoring | Page 48 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing Table Place “X” under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Christy J. Brush Project Manager        Tim Blankenship, PE Principal       Yong Chen, PhD, PE Coastal Engineering    Michael N. Herrman, PE Waterfront/Waterway Engineering  Nicole Pauly, PE Marine Structures  Laura M. Shepherd, CFM Environmental/Permitting     Barbara Pederzoli, AIA1 Architecture  Luis Revuelta, AIA1 Architecture  Erin Hodel5 Marine Environmental     David Snyder5 Biologist     Adam Crouch, PE Civil Engineering Craig Clevenger4 Environmental Engineering  Arvind Kumbhojkar, PhD, PE2 Geotechnical  John Riege, PE, PG2 Geologist  John Morgan, II, PLS3 Surveying     James Schoonmaker Construction Cost Estimating    Nicole VanderBeke, PE GIS, Coastal Data  1=Revuelta Architecture, 2=HP Consultants, 3=Morgan & Eklund, 4= EE&G, 5=CSA Ocean Science 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECT F) NO. TITLE OF EXAMPLE PROJECT (FROM SECT F) 1 Residences by Armani/Casa, Sunny Isles Beach, FL 6 Miami Beach Hotspots Renourishment Project Miami-Dade County, FL 2 Hillsboro/Deerfield Beach Nourishment, FL 7 Jade Beach, City of Sunny Isles Beach, FL 3 Key Biscayne Beach Management, Key Biscayne, FL 8 Environmental Due Diligence Assessments, Tank Removal, and Site Assessment, Miami, FL 4 Hollywood Dune Master Plan, Hollywood, FL 9 Nearshore Hardbottom Monitoring Surveys For The Martin County Shore Protection Project, Martin County, FL 5 Dinner Key North Mooring Field, Miami, FL 10 Seagrass Restoration In Biscayne Bay – Miami Dade County, FL | Page 49 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) STANDARD FORM 330 (REV. 8/2016) ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME MOFFATT & NICHOL 3. YEAR ESTABLISHED 2013 4. UNIQUE ENTITY IDENTIFIER 079836171 2b. STREET 2937 SW 27th Avenue, Suite 101A 5. OWNERSHIP a. TYPE Corporation 2c.CITY Coconut Grove 2d. STATE FL 2e. ZIP CODE 33133 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Timothy K. Blankenship, Senior Coastal Engineer 7. NAME OF FIRM (If block 2a is a branch office) MOFFATT & NICHOL 6b. TELEPHONE NUMBER (305) 230-1924 6c. E-MAIL ADDRESS tblankenship@moffattnichol.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER Moffatt & Nichol Engineers 1957 054860010 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 02 Administration 99 C07 Coastal Engineering 2 08 CADD Technician 77 D04 Design-Build Preparation of RFPs 1 12 Civil Engineer 62 D08 Dredging Studies & Design 1 15/16 Construction Inspector/Manager 9 E03 Electrical Studies & Design 1 21 Electrical Engineer 11 E09 EIS, EA, Environmental Statements 2 23/24 Environmental Engineer/Scientist 12 2 H01 Harbors; Jetties; Piers; Ship Terminals 1 29 GIS Specialist 7 P05 Planning (Community, Regional) 1 42 Mechanical Engineer 9 P06 Planning (Site, Installation, & Project) 1 47 Planner: Urban/Regional 1 M02 Materials Handling Systems 1 48 Project Manager 32 1 R04 Recreation Facilities (Parks, Marinas) 2 57 Structural Engineer 136 1 R11 Rivers; Canals; Flood Control 1 60 Transportation Engineer 33 S13 Stormwater Handling & Facilities 1 62 Water Resources Engineer 17 W02 Water Resources; Groundwater 1 Coastal/Hydraulic Engineer 64 3 Civil Site Work 1 Dredging Specialist/Engineer 3 Lake Habilitation & Management 1 NEPA Planners 3 Mathematical Modeling 1 Port Planner/Engineer 14 Wetlands 1 Rail Engineer/Specialist 8 Transportation Economist 8 Transportation Planner 3 Waterfront Planner 4 Other Employees 59 Total 671 7 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF ENTIRE FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 8 b. Non-Federal Work 10 c. Total Work 10 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 02/06/18 c. NAME AND TITLE Eric A. Nichol, PhD, PE, President | Page 50 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) STANDARD FORM 330 (REV. 8/2016) ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) PART II –GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME MOFFATT & NICHOL 3. YEAR ESTABLISHED 2000 4. UNIQUE ENTITY IDENTIFIER 142671689 2b. STREET 101 W. Main Street, 800 World Trade Center 5. OWNERSHIP a. TYPE Corporation 2c.CITY Norfolk 2d. STATE VA 2e. ZIP CODE 23510 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Michael N.Rieger,PE, Vice President 7. NAME OF FIRM (If block 2a is a branch office) MOFFATT & NICHOL 6b. TELEPHONE NUMBER (757)628-8222 6c. E-MAIL ADDRESS mrieger@moffattnichol.com 8a. FORMER FIRM NAME(S) (If any)8b.YR. ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER Moffatt & Nichol Engineers 1957 054860010 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a.Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below)(1) FIRM (2) BRANCH 02 Administration 102 5 B02 Bridges 4 08 CADD Technician 70 1 C07 Coastal Engineering 4 12 Civil Engineer 64 3 C15 Construction Management 1 15/16 Construction Inspector/Manager 11 D08 Dredging Studies & Design 3 18 Cost Engineer/Estimator 4 H01 Harbors; Jetties; Piers; Ship Terminals 6 21 Electrical Engineer 10 1 H07 Highways; Streets; Parking Lots 1 23/24 Environmental Engineer/Scientist 12 N01 Naval Architecture; Offshore Platforms 1 27 Foundation/Geotechnical Engineer 4 2 P05 Planning (Community, Regional, State)1 29 GIS Specialist 7 P06 Planning (Site, Installation, & Project)1 42 Mechanical Engineer 6 R03 Railroad; Rapid Transit 1 48 Project Manager 32 3 R04 Recreation Facilities (Parks, Marinas)1 57 Structural Engineer 138 11 60 Transportation Engineer 27 62 Water Resources Engineer 9 Coastal/Hydraulic Engineer 66 2 Dredging Specialist/Engineer 3 NEPA Planners 3 Port Planner/Engineer 12 1 Rail Engineer/Specialist 8 Transportation Economist 9 Transportation Planner 3 Other Employees 41 Total 641 29 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF ENTIRE FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1.Less than $100,000 6.$2 million to less than $5 million 2.$100,000 to less than $250,000 7.$5 million to less than $10 million 3.$250,000 to less than $500,000 8.$10 million to less than $25 million 4.$500,000 to less than $1 million 9.$25 million to less than $50 million 5.$1 million to less than $2 million 10.$50 million or greater a. Federal Work 8 b. Non-Federal Work 10 c. Total Work 10 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 01/18/17 c. NAME AND TITLE Michael N. Rieger, PE, Business Unit Leader | Page 51 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) STANDARD FORM 330 (REV.8/2016) ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) PART II –GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAMEMOFFATT & NICHOL 3. YEAR ESTABLISHED 2005 4. UNIQUE ENTITY IDENTIFIER 783792190 2b. STREET 1025 Greenwood Boulevard, Suite 371 5. OWNERSHIP a. TYPE Corporation 2c.CITY Lake Mary 2d. STATE FL 2e. ZIP CODE 32746 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Forest W. Adkins,PE, Transportation Engineer 7. NAME OF FIRM (If block 2a is a branch office) MOFFATT & NICHOL 6b. TELEPHONE NUMBER (407)562-2030 6c. E-MAIL ADDRESS fadkins@moffattnichol.com 8a. FORMER FIRM NAME(S) (If any)8b. YR. ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER Moffatt & Nichol Engineers 1957 054860010 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a.Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below)(1) FIRM (2) BRANCH 02 Administration 102 2 C07 Coastal Engineering 1 08 CADD Technician 70 C18 Cost Estimating; Cost Eng. & Anal.1 12 Civil Engineer 64 D05 Digital Elev. & Terrain Model Develop.1 15/16 Construction Inspector/Manager 11 H07 Highways; Streets; Parking Lots 5 18 Cost Engineer/Estimator 4 M06 Mining & Mineralogy 1 21 Electrical Engineer 10 P05 Planning (Community, Regional, State)1 23/24 Environmental Engineer/Scientist 12 P06 Planning (Site, Installation, & Project)1 27 Foundation/Geotechnical Engineer 4 S13 Storm Water Handling & Facilities 3 29 GIS Specialist 7 U03 Utilities (Gas & Steam)1 42 Mechanical Engineer 6 W02 Water Resources; Hydrology 1 48 Project Manager 32 1 57 Structural Engineer 138 60 Transportation Engineer 27 5 62 Water Resources Engineer 9 1 Coastal/Hydraulic Engineer 66 Dredging Specialist/Engineer 3 NEPA Planners 3 Port Planner/Engineer 12 Rail Engineer/Specialist 8 Transportation Economist 9 Transportation Planner 3 Other Employees 41 Total 641 9 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF ENTIRE FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1.Less than $100,000 6.$2 million to less than $5 million 2.$100,000 to less than $250,000 7.$5 million to less than $10 million 3.$250,000 to less than $500,000 8.$10 million to less than $25 million 4.$500,000 to less than $1 million 9.$25 million to less than $50 million 5.$1 million to less than $2 million 10.$50 million or greater a. Federal Work 8 b. Non-Federal Work 10 c. Total Work 10 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 01/18/17 c. NAME AND TITLE Eric A. Nichol, PhD, PE, President | Page 52 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004)PAGE 6 ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) PART II –GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME MOFFATT & NICHOL 3. YEAR ESTABLISHED 1981 4. DUNS NUMBER 033996026 2b. STREET 4700 Falls of Neuse Road, Suite 300 5. OWNERSHIP a. TYPE Corporation 2c.CITY Raleigh 2d. STATE NC 2e. ZIP CODE 27609 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Timothy R. Reid,PE, Vice President 7. NAME OF FIRM (If block 2a is a branch office) MOFFATT & NICHOL 6b. TELEPHONE NUMBER (919)781-4626 6c. E-MAIL ADDRESS treid@moffattnichol.com 8a. FORMER FIRM NAME(S) (If any)8b. YR. ESTABLISHED 8c. DUNS NUMBER Moffatt & Nichol Engineers 1957 054860010 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a.Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below)(1) FIRM (2) BRANCH 02 Administration 102 6 B02 Bridges 3 08 CADD Technician 70 8 C07 Coastal Engineering 3 12 Civil Engineer 64 5 C15 Construction Management 1 15/16 Construction Inspector/Manager 11 D08 Dredging Studies & Design 2 18 Cost Engineer/Estimator 4 E09 Environ. Impact Studies, EAs & EISs 3 21 Electrical Engineer 10 E10 Environ. & Nat’l Resource Mapping 1 23/24 Environmental Engineer/Scientist 12 4 E11 Environmental Planning 1 27 Foundation/Geotechnical Engineer 4 G04 GIS Services; Development, Analysis 1 29 GIS Specialist 7 4 H01 Harbors; Jetties; Piers; Ship Terminals 5 42 Mechanical Engineer 6 H07 Highways; Streets; Parking Lots 4 48 Project Manager 32 4 L06 Lighting (Exteriors; Streets; Memorials)1 57 Structural Engineer 138 9 P05 Planning (Community, Regional, State)1 60 Transportation Engineer 27 3 R03 Railroad; Rapid Transit 4 62 Water Resources Engineer 9 4 R04 Recreation Facilities (Parks, Marinas)1 Coastal/Hydraulic Engineer 66 7 R11 Rivers; Canals; Waterways; Flood Cntrl 4 Dredging Specialist/Engineer 3 S03 Seismic Designs & Studies 1 NEPA Planners 3 2 S09 Structural Design; Special Structures 2 Port Planner/Engineer 12 S13 Storm Water Handling & Facilities 2 Rail Engineer/Specialist 8 3 T03 Traffic & Transportation Engineering 1 Transportation Economist 9 W02 Water Resources; Hydrology 4 Waterfront Planner 1 1 W03 Water Supply; Treatment & Distribution 1 Other Employees 43 9 Civil Site Work 1 Total 641 69 Economic Impact & Feasibility Studies 1 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF ENTIRE FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1.Less than $100,000 6.$2 million to less than $5 million 2.$100,000 to less than $250,000 7.$5 million to less than $10 million 3.$250,000 to less than $500,000 8.$10 million to less than $25 million 4.$500,000 to less than $1 million 9.$25 million to less than $50 million 5.$1 million to less than $2 million 10.$50 million or greater a. Federal Work 8 b. Non-Federal Work 10 c. Total Work 10 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 01/18/17 c. NAME AND TITLE Timothy R. Reid, PE, Vice President | Page 53 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) STANDARD FORM 330 (REV. 8/2016) ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) PART II –GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAMEMOFFATT & NICHOL 3. YEAR ESTABLISHED 1994 4. UNIQUE ENTITY IDENTIFIER 027283303 2b. STREET 501 East Kennedy Boulevard 5.OWNERSHIP a. TYPE Corporation2c.CITY Tampa 2d. STATE FL 2e. ZIP CODE 33602 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Jeffrey D. Malyszek, PE, Vice President 7. NAME OF FIRM (If block 2a is a branch office) MOFFATT & NICHOL6b. TELEPHONE NUMBER (813)258-8818 6c. E-MAIL ADDRESS jmalyszek@moffattnichol.com 8a. FORMER FIRM NAME(S) (If any)8b. YR. ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER Moffatt & Nichol Engineers 1957 054860010 9.EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a.Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below)(1) FIRM (2) BRANCH 02 Administration 102 1 B02 Bridges 1 08 CADD Technician 70 6 C07 Coastal Engineering 4 12 Civil Engineer 64 C10 Commercial Building (low rise)1 15/16 Construction Inspector/Manager 11 1 C15 Construction Management 1 18 Cost Engineer/Estimator 4 D04 Design-Build Projects 1 21 Electrical Engineer 10 2 D08 Dredging Studies & Design 2 23/24 Environmental Engineer/Scientist 12 E09 Environ. Studies, Assessments or Statements 1 27 Foundation/Geotechnical Engineer 4 1 H01 Harbors; Jetties; Piers; Ship Terminals 4 29 GIS Specialist 7 H07 Highways; Streets; Parking Lots 1 42 Mechanical Engineer 6 L06 Lighting (Exteriors)1 48 Project Manager 32 P05 Planning (Community, Regional, State)1 57 Structural Engineer 138 7 P06 Planning (Site, Installation, & Project)1 60 Transportation Engineer 27 R04 Recreation Facilities (Parks, Marinas)4 62 Water Resources Engineer 9 R11 Rivers; Canals; Waterways; Flood Cntrl 1 Coastal/Hydraulic Engineer 66 4 S02 Security Systems 1 Dredging Specialist/Engineer 3 S13 Storm Water Handling & Facilities 1 NEPA Planners 3 T02 Testing & Inspection Services 1 Port Planner/Engineer 12 W01 Warehouses & Depots 1 Rail Engineer/Specialist 8 W02 Water Resources; Hydrology 1 Transportation Economist 9 W03 Water Supply, Treatment & Distribut’n 1 Transportation Planner 3 1 Mathematical Modeling 1 Other Employees 41 Permitting 1 Total 641 23 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1.Less than $100,000 6.$2 million to less than $5 million 2.$100,000 to less than $250,000 7.$5 million to less than $10 million 3.$250,000 to less than $500,000 8.$10 million to less than $25 million 4.$500,000 to less than $1 million 9.$25 million to less than $50 million 5.$1 million to less than $2 million 10.$50 million or greater a.Federal Work 8 b.Non-Federal Work 10 c. Total Work 10 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 01/18/17 c. NAME AND TITLE Jeffrey D.Malyszek, PE, Vice President | Page 54 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) Notice of Qualifications (FDOT) Florida Department of Transportation RICK SCOTT GOVERNOR 605 Suwannee Street Tallahassee, FL 32399-0450 MIKE DEW SECRETARY www.fdot.gov November 21, 2017 Darrell Nance, Business Unit Leader MOFFATT & NICHOL, INC. 1025 Greenwood Boulevard, Suite 371 Orlando, Florida 32746 Dear Mr.Nance: The Florida Department of Transportation has reviewed your application for qualification package and determined that the data submitted is adequate to technically qualify your firm for the following types of work: Group 2 -Project Development and Environmental (PD&E) Studies Group 3 -Highway Design -Roadway 3.1 -Minor Highway Design 3.2 -Major Highway Design 3.3 -Controlled Access Highway Design Group 4 -Highway Design - Bridges 4.1.1 -Miscellaneous Structures 4.1.2 -Minor Bridge Design 4.2.1 -Major Bridge Design -Concrete 4.2.2 -Major Bridge Design –Steel 4.2.3 -Major Bridge Design -Segmental Group 5 -Bridge Inspection 5.1 -Conventional Bridge Inspection 5.2 -Movable Bridge Inspection 5.3 -Complex Bridge Inspection 5.4 -Bridge Load Rating Group 6 -Traffic Engineering and Operations Studies 6.1 -Traffic Engineering Studies 6.2 -Traffic Signal Timing Group 7 -Traffic Operations Design 7.1 -Signing, Pavement Marking and Channelization 7.2 -Lighting 7.3 -Signalization | Page 55 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) www.fdot.gov Group 13 -Planning 13.4 -Systems Planning 13.5 -Subarea/Corridor Planning 13.6 -Land Planning/Engineering Your overhead audit has been accepted, enabling your firm to compete for Professional Services projects advertised at the unlimited level,with estimated fees of any dollar amount. This status shall be valid until June 30, 2018 for contracting purposes. Approved Rates Home/ Branch Overhead Facilities Capital Cost of Money Premium Overtime Home Direct Expense 182.08%0.347%Reimbursed 4.44% Should you have any questions, please feel free to contact me by email at carliayn.kell@dot.state.fl.us or by phone at 850-414-4597. Sincerely, Carliayn Kell Professional Services Qualification Administrator CBE Certification for Prime Not Applicable Audit Report Shown on the following pages. | Page 56 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) Moffatt & Nichol and Subsidiaries Consolidated Financial Statements December 31, 2016 and December 26, 2015 CO N F I D E N T I A L | Page 57 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) INDEPENDENT AUDITORS’ REPORT To the Board of Directors and Shareholders Moffatt & Nichol and Subsidiaries We have audited the accompanying consolidated financial statements of Moffatt & Nichol (a California corporation) and Subsidiaries (collectively the “Company”), which comprise the consolidated balance sheets as of December 31, 2016 and December 26, 2015, and the related consolidated statements of comprehensive income, shareholders’ equity, and cash flows for the fiscal years then ended, and the related notes to the consolidated financial statements. Management’s Responsibility for the Consolidated Financial Statements Management is responsible for the preparation and fair presentation of these consolidated financial statements in accordance with accounting principles generally accepted in the United States of America; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of consolidated financial statements that are free from material misstatement, whether due to fraud or error. Auditors’ Responsibility Our responsibility is to express an opinion on these consolidated financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free from material misstatement. An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the consolidated financial statements. The procedures selected depend on the auditors’ judgment, including the assessment of the risks of material misstatement of the consolidated financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the consolidated financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion. CO N F I D E N T I A L | Page 58 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) Opinion In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the financial position of Moffatt & Nichol and Subsidiaries as of December 31, 2016 and December 26, 2015, and the results of their operations and their cash flows for the fiscal years then ended in accordance with accounting principles generally accepted in the United States of America. Other Matter Our audits were conducted for the purpose of forming an opinion on the consolidated financial statements taken as a whole. The supplemental schedules presented on pages 28 through 30 are presented for purposes of additional analysis and are not a required part of the consolidated financial statements. Such information is the responsibility of management and was derived from and relates directly to the underlying accounting and other records used to prepare the consolidated financial statements. The information has been subjected to the auditing procedures applied in the audits of the consolidated financial statements and certain additional procedures, including comparing and reconciling such information directly to the underlying accounting and other records used to prepare the consolidated financial statements or to the consolidated financial statements themselves, and other additional procedures in accordance with auditing standards generally accepted in the United States of America. In our opinion, the information is fairly stated in all material respects in relation to the consolidated financial statements taken as a whole. SQUAR MILNER LLP Newport Beach, California March 28, 2017 CO N F I D E N T I A L | Page 59 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) MOFFATT & NICHOL AND SUBSIDIARIES CONSOLIDATED BALANCE SHEETS December 31, 2016 and December 26, 2015 Page 3 The accompanying notes are an integral part of these consolidated financial statements. 2016 2015 ASSETS Current Assets Cash and cash equivalents $ 6,929,000 $ 9,147,000 Short-term investments 692,000 736,000 Contracts receivable, net 36,478,000 38,579,000 Prepaid expenses and other assets 7,515,000 4,595,000 Total current assets 51,614,000 53,057,000 Property and Equipment, net 5,381,000 5,549,000 Noncurrent Assets Deferred income taxes 7,419,000 6,871,000 Investments in and advances to unconsolidated joint ventures 602,000 528,000 Cash surrender value of life insurance – 1,740,000 Deposits and other assets 942,000 866,000 Total noncurrent assets 8,963,000 10,005,000 Total assets $ 65,958,000 $ 68,611,000 LIABILITIES AND SHAREHOLDERS’ EQUITY Current Liabilities Accounts payable and accrued liabilities $ 10,453,000 $ 9,159,000 Accrued payroll and related liabilities 4,711,000 6,249,000 Billings in excess of costs on uncompleted contracts 4,002,000 5,886,000 Current portion of long-term debt to officers and shareholders 1,061,000 1,048,000 Line of credit – 4,000,000 Insurance financing agreement 760,000 – Deferred income taxes 9,824,000 10,120,000 Total current liabilities 30,811,000 36,462,000 Noncurrent Liabilities Long-term debt to officers and shareholders, net of current portion 1,697,000 2,017,000 Total noncurrent liabilities 1,697,000 2,017,000 Total liabilities 32,508,000 38,479,000 Commitments and Contingencies (Note 13) Shareholders’ Equity Preferred stock, $100 par value; 2,000 shares authorized, no shares issued or outstanding – – Common stock, no par value; 1,500,000 shares authorized; 245,300 and 260,550 shares issued and outstanding as of December 31, 2016 and December 26, 2015, respectively 11,000 11,000 Additional paid-in capital (4,525,000) (2,200,000) Subscription notes receivable (1,420,000) (1,748,000) Retained earnings (appropriated) 4,000,000 – Retained earnings (un-appropriated) 38,849,000 37,576,000 Accumulated other comprehensive loss (3,465,000) (3,507,000) Total shareholders’ equity 33,450,000 30,132,000 Total liabilities and shareholders’ equity $ 65,958,000 $ 68,611,000 CO N F I D E N T I A L | Page 60 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) MOFFATT & NICHOL AND SUBSIDIARIES CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME For the Fiscal Years Ended December 31, 2016 and December 26, 2015 Page 4 The accompanying notes are an integral part of these consolidated financial statements. 2016 2015 REVENUE $ 140,181,000 $ 135,775,000 COSTS AND EXPENSES Direct labor (35,064,000) (34,670,000) Subconsultants (30,834,000) (25,778,000) Other direct (3,575,000) (3,133,000) Selling, general and administrative (71,676,000) (68,987,000) Equity in net earnings of unconsolidated joint ventures 106,000 199,000 Total costs and expenses, net (141,043,000) (132,369,000) OPERATING (LOSS) INCOME (862,000) 3,406,000 OTHER INCOME (EXPENSE) Interest expense (157,000) (173,000) Interest income 91,000 90,000 Gain on life insurance (Note 7) 4,701,000 – INCOME BEFORE INCOME TAXES 3,773,000 3,323,000 INCOME TAX BENEFIT (PROVISION) 1,500,000 (385,000) NET INCOME $ 5,273,000 $ 2,938,000 Other comprehensive income (loss), net of tax: Foreign currency translation adjustments $ 86,000 $ (1,515,000) Unrealized (loss) gain on change in fair value of investments (44,000) 54,000 Total net other comprehensive income (loss), net of tax 42,000 (1,461,000) Comprehensive income $ 5,315,000 $ 1,477,000 CO N F I D E N T I A L | Page 61 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) Firm References & Similar Work Completed Years in Business: 73 Type of Organization: Corporation Main Point of Contact/Project Manager: Christy Brush Offices: 35 Offices Worldwide Miami Location (Project Office): 2937 SW 27th Avenue, Suite 101A, Coconut Grove, FL 33133 Firm Headquarters: 3780 Kilroy Airport Way, Suite 600, Long Beach, CA 90806 Number of Employees: 671 Worldwide Moffatt & Nichol by the Numbers Please refer to Section E SF330 forms for relevant work completed and associated reference information. Our reference questionnaires follow. | Page 62 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) REFERENCE QUESTIONNAIRE It is the responsibility of the consultant to provide a minimum of three (3) different government agency reference other than City of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Bidder) MOFFATT & NICHOL Firm giving Reference: TOWN OF HILLSBORO BEACH Address: 1210 HILLSBORO MILE, HILLSBORO BEACH, FL Phone: 954-427-4011 Fax: Email: MSERDA@TOWNOFHILLSBOROBEACH.COM 1. Q: What was the title of the contract or job assigned to Bidder? A: Coastal engineering and permitting services 2. Q: What was the scope of work/services assigned to Bidder? A: Physical/biological monitoring, coastal numerical modeling, design, permitting, and construction administration of 2018 truck haul beach nourishment. 3. Q: Have there been any change orders, and if so how many? A: No change orders, however we add amendments to their scope of work as needed to further the Town’s goals. 4. Q: Do they perform on a timely basis as required by the agreement? A: yes 5. Q: Was the project manager easy to get in contact with? A: yes 6. Q: Would you use them again? A: yes, M&N are our Town’s engineers for all coastal matters. 7. Q: Overall, what would you rate their performance? A: A+, Highly reliable, reputable & skilled. They have represented us well in Tallahassee, with FEMA and any other places as needed. 8. Q: Is there anything else we should know, that we have not asked? A: They are accommodating and highly skilled in their engineering assignments. The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free from vendor interference/collusion. Name: Mac Serda Sign Name: Title Town Manager Date: 29 City of Sunny Isles Beach |Request for Qualifications No. 18-02-01 | Page 63 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) | Page 64 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) | Page 65 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) | Page 66 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) Corporate Standing & Authorized Signatory Title Page Project Title: Request for Qualification | Coastal Engineering Design, Permitting, and Construction Management Services Project Number: RFQ NO. 2017-35 Applicant Firm: Moffatt & Nichol 2937 SW 27th Avenue, Suite 101A Coconut Grove, Florida 33133 Main Contact: Tim Blankenship Tel: (305) 230-1924 May 30, 2017 Moffatt & Nichol Subsidiaries: Moffatt & Nichol, London 34 Lime Street London EC3M 7AT United Kingdom Telephone: + 44 20 3206 1062 Taxpayer ID: 20-4975851 Senior Executive: Tim Denton Moffatt & Nichol Chile SpA Rosario Norte 555 Of 803 Las Condes, Santiago, Chile Telephone: +56 2 3223 9777 Taxpayer ID: RUT 76.243.516-01 Senior Executive: Fernando Gonzalez Chana Moffatt & Nichol, Latin America, Inc. Ocean Business Plaza, Oficina 1204 Ave Aquilino de la Guardia y Calle 47 Panama, Republica de Panama Telephone: + 507-301-0901 Taxpayer ID: Not Applicable Senior Executive: Juliana Gonzalez Acevedo Moffatt & Nichol, International 3780 Kilroy Airport Way, Suite 750 Long Beach, California 90806 Telephone: (562) 590-6500 Taxpayer ID: 33-0576360 Senior Executive: John Lesnik Moffatt & Nichol Engenharia E Consultoria Ltda Av. Afonso Arinos de Melo Franco, No. 222, Bloco 1-Sala 1509 Barra da Tijuca – Rio de Janeiro - RJ, Brazil CEP 22631-455 Telephone: +55 21 3202 6100 Taxpayer ID CNP J/MF No. 12.364.359/0001-27 Senior Executive: Marcio Dos Santos Moffatt & Nichol Information Systems, LLC 3780 Kilroy Airport Way, Suite 750 Long Beach, California 90806 Telephone: (562) 590-6500 Taxpayer ID: 45-5561991 Moffatt & Nichol Colombia SAS Avenida Cra. 9 No. 113-52, Of. 1201 Bogota D.C., Colombia Telephone: + 57 1213 1149 Taxpayer ID: NIT 900400918-7 Senior Executive’s Name: Juliana Gonzalez Acevedo Craney Island Design Partners, LLC 800 World Trade Center 101 West Main Street, Suite 800 Norfolk, Virginia 23510 Telephone: 757-628-8222 Taxpayer ID: 20-8713256 Senior Executive’s Name: John Lesnik | Page 67 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) 6WDWH RI )ORULGD 'HSDUWPHQW RI 6WDWH , FHUWLI\ IURP WKH UHFRUGV RI WKLV RIILFH WKDW 02))$77 1,&+2/ ,1& LV D &DOLIRUQLD FRUSRUDWLRQ DXWKRUL]HG WR WUDQVDFW EXVLQHVV LQ WKH 6WDWH RI )ORULGD TXDOLILHG RQ -XQH   7KH GRFXPHQW QXPEHU RI WKLV FRUSRUDWLRQ LV 3 , IXUWKHU FHUWLI\ WKDW VDLG FRUSRUDWLRQ KDV SDLG DOO IHHV GXH WKLV RIILFH WKURXJK 'HFHPEHU   WKDW LWV PRVW UHFHQW DQQXDO UHSRUWXQLIRUP EXVLQHVV UHSRUW ZDV ILOHG RQ -DQXDU\   DQG WKDW LWV VWDWXV LV DFWLYH , IXUWKHU FHUWLI\ WKDW VDLG FRUSRUDWLRQ KDV QRW ILOHG D &HUWLILFDWH RI :LWKGUDZDO *LYHQ XQGHU P\ KDQG DQG WKH *UHDW 6HDO RI WKH 6WDWH RI )ORULGD DW 7DOODKDVVHH WKH &DSLWDO WKLV WKH 7HQWK GD\ RI -DQXDU\  7UDFNLQJ 1XPEHU && 7R DXWKHQWLFDWH WKLV FHUWLILFDWHYLVLW WKH IROORZLQJ VLWHHQWHU WKLV QXPEHU DQG WKHQ IROORZ WKH LQVWUXFWLRQV GLVSOD\HG KWWSVVHUYLFHVVXQEL]RUJ)LOLQJV&HUWLILFDWH2I6WDWXV&HUWLILFDWH$XWKHQWLFDWLRQ | Page 68 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) | Page 69 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) | Page 70 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) | Page 71 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) | Page 72 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) City of Sunny Isles Beach |Request for Qualifications No. 18-02-01 30 RESPONDENT SUBMITTAL FORM: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS RFQ Addendum #1, Dated Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS RFQ FIRM NAME: AUTHORIZED SIGNATURE:DATE: TITLE OF OFFICER: Friday, March 9, 2018 Wednesday, March 14, 2018 Tuesday, March 20, 2018 Moffatt & Nichol -- Jeffrey Malyszek Vice President March 22, 2018 Forms & Attachments | Page 73 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) Firm Name: _____________________________________________________________________________ Street Address: _____________________________________________________________________________ Mailing Address (if different): _____________________________________________________________________________ Telephone No. _______________________________Fax No. _________________________ Email Address: _______________________________ FEIN No. *“By signing this document the Responder agrees to all Terms Signature: __________________________________________________________________ (Signature of authorized agent) Print Name: _________________________ Moffatt & Nichol 2937 SW 27th Avenue, Suite 101A, Coconut Grove, FL 33133 305-230-1924 jmalyszek@moffattnichol.com 95-1951343 Jeffrey Malyszek, PE Vice PresidentTitle: _________________________________________ THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF FIRM TO BE BOUND BY THE TERMS OF ITS SUBMISSION. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE SUBMISSION NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY SUBMISSION THAT INCLUDES AN EXECUTED DOCUMENT, WHICH UNEQUIVOCALLY BINDS THE FIRM TO THE TERMS OF ITS OFFER. The contract terms with which we take exception are described below: • General Terms & Conditions 1.34 (DUTY TO DEFEND, INDEMNIFY AND HOLD HARMLESS): We request that the DUTY TO DEFEND, INDEMNIFY AND HOLD HARMLESS” in General Terms & Conditions 1.34 be modified to comply with Florida Statutes Section 725.08 governing indemnification obligations in design professional contracts. • Special Terms & Conditions 2.9.4: Requires evidence of professional liability of at least $1 million on a per occurrence basis. Please note that our Professional Liability insurance is written on a per claim basis, not a per occurrence basis. | Page 74 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) | Page 75 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) | Page 76 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) | Page 77 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) | Page 78 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) | Page 79 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA) Moffatt & Nichol Professional Liability Litigation – Claims 3780 Kilroy Airport Way, Suite 750 Long Beach, CA 90806 (562) 590-6500 Fax (562) 590-6512 www.moffattnichol.com Moffatt & Nichol is a multinational corporation with over 600 employees worldwide. Although Moffatt & Nichol employs aggressive quality control efforts to minimize claims, Moffatt & Nichol is occasionally involved in claims and litigation typical of that generally asserted against design professionals. A listing of current active litigated claims/outstanding judgments is included below as well as cases within the previous five (5) years where Moffatt & Nichol was a defendant in court. Please note, Moffatt & Nichol does not disclose non-public information related to claims or litigation due to various contractual obligations and the need to protect attorney work product and attorney -client privileged communications. However, we have no reason to believe that these claims will materially affect Moffatt & Nichol’s ability to perform services under this or any other contract. If you require additional information, please contact our General Counsel, David Huchel at 562.308.5370. 1. Name of Case: Coastal Construction & Engineering, LLC, Pltf. v. Moffatt & Nichol, Inc., Dft. Court Case ID No.: Docket No. 131939 Div. “G” Date of Filing: December 14, 2017 State: Louisiana Description: Negligence 2. Name of Case: Cormier v. River City Construction, Moffatt & Nichol, et. al. Court Case ID No.: 2013-6219 Division M Date of Filing: July 1, 2013 State: Louisiana Description: Personal Injury 3. Name of Case: Salyer v Moffatt & Nichol Court Case ID No.: 201531576CICI Date of Filing: February 26, 2016 State: Florida Description: Motor Vehicle Accident – Matter Resolved 4. Name of Case: South Carolina Ports Authority v Moffatt & Nichol Court Case ID No.: Court of Common Pleas for the Ninth Judicial Circuit Case No. 2016-CP-10- Date of Filing: September 26, 2016 State: South Carolina Description: Breach of Contract / Negligence – Matter Resolved 5. Name of Case: Dominick Gulli PE, PLS v. San Joaquin Area Flood Control Agency, ICF International, Inc., Peterson and Brustad, Inc., and Moffatt & Nichol Court Case ID No.: STK-CV-UWM-2015-0011880 Date of Filing: December 18, 2015 State: California Description: CEQA Claim – Matter Dismissed 6. Name of Case: George Argoud and Others v. San Diego Association of Governments (SANDAG) Court Case ID No.: 37-2013-00081555-CU-EI-CTL Date of Filing: December 30, 2013 State: California Description: Property Damage – Matter Resolved 7. Name of Case: State Ready Mix, Inc. v. Moffatt & Nichol and Others Court Case ID No.: 56-2012-00423313-CU-BC-VTA Date of Filing: October 22, 2012 State: California Description: Cross-Complaint - Breach of Contract/Warranty – Matter Dismissed 8. Name of Case: Flying M Ranch, LLC, and Martin Container Terminal v. Moffatt & Nichol Court Case ID No.: BC488267 Date of Filing: July 13, 2012 State: California Description: Breach of Contract / Negligence - Matter Resolved | Page 80 City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 Marine And Coastal Professional Engineering Consulting Services (CCNA)