Loading...
HomeMy WebLinkAboutAPTIMMARINE AND COASTAL PROFESSIONAL ENGINEERING CONSULTING SERVICES (CCNA) 01C032018D Aptim Environmental & Infrastructure, Inc. ORIGINAL Request for Qualifications No. 18-02-01 March 2018 CITY OF SUNNY ISLES BEACH, FLORIDA 01C032018D A . T I T L E P A G E A. TITLE PAGE MARINE AND COASTAL PROFESSIONAL ENGINEERING CONSULTING SERVICES (CCNA) 01C032018D Aptim Environmental & Infrastructure, Inc. Request for Qualifications No. 18-02-01 March 2018 CITY OF SUNNY ISLES BEACH, FLORIDA 01C032018D B . T A B L E O F C O N T E N T S B. TABLE OF CONTENTS City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  3  01C032018D    B. TABLE OF CONTENTS  A. TITLE PAGE ..................................................................................................................................... 2  B. TABLE OF CONTENTS ...................................................................................................................... 3  C. COVER LETTER AND EXECUTIVE SUMMARY ................................................................................... 4  D. PROJECT APPROACH AND UNDERSTANDING ................................................................................. 6  Understanding of the City’s Needs .................................................................................................... 6  General Technical Approach .............................................................................................................. 7  Project Engineering Design .............................................................................................................. 14  Project Management ....................................................................................................................... 17  E. QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL ...................................................... 22  Background of the Team Members ................................................................................................. 22  Aptim Environmental & Infrastructure Inc. ..................................................................................... 22  Sub‐consultant Team ....................................................................................................................... 33  Standard Form 330 Part I and II ....................................................................................................... 35  F. FIRM REFERENCES AND SIMILAR WORK COMPLETED .................................................................. 36  G. CORPORATE STANDING AND AUTHORIZED SIGNATORY .............................................................. 45  H. FORMS AND ATTACHMENTS ........................................................................................................ 46      01C032018D C . C O V E R L E T T E R A N D E X E C U T I V E S U M M A R Y C. COVER LETTER AND EXECUTIVE SUMMARY 01C032018D D . P R O J E C T A P P R O A C H A N D U N D E R S T A N D I N G D. PROJECT APPROACH AND UNDERSTANDING City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  6  01C032018D    D. PROJECT APPROACH AND UNDERSTANDING  The following presents our understanding of the City’s needs, our general technical approach, and a  summary of APTIM’s project management philosophy used to deliver value and quality to the City’s  marine and coastal engineering projects.  Understanding of the City’s Needs The City of Sunny Isles Beach is a unique coastal community and environment that requires an in‐depth  understanding of the resources, challenges, and program designed to protect it. The City is bordered by  both the Atlantic Ocean and Intracoastal Waterway, each of which present unique management  challenges. The City’s Atlantic Ocean shoreline is an asset that is influenced by the lack of sediment  bypassing at Port Everglades, beach nourishment projects between Port Everglades and Bakers Haulover  Inlet, and localized erosional hot spots within the City. Recent erosional losses in Sunny Isles Beach may  be the result of many factors including sand from the Broward County Segment III project moving through  the City, lower than normal longshore transport rates providing sand alongshore, historical hot spots  returning to an equilibrium position as sand moves south, the recent modifications to the Newport Pier  allowing adjacent shoreline to reach a new equilibrium, and of course, recent storm impacts. The City’s  shoreline is also managed through a series of public and privately owned bulkheads along the Intracoastal  Waterway, which provide stabilization and flood protection.  The beach in the City is currently maintained through the Federally‐authorized Miami‐Dade County Beach  Erosion Control and Hurricane Surge Protection Project. The shoreline is currently being nourished (2018)  by the U.S. Army Corps of Engineers, with support from Miami‐Dade County under this authorization. The  project is placing sand in previously identified erosional hotspots in the north end of the City near the  Ocean I and II Condominiums, as well as the shoreline adjacent to the Newport Pier. Continued  coordination with all relevant stakeholders and physical monitoring is recommended moving forward  should these areas present further erosion and require action.  It is our understanding that the City has previously evaluated coastal erosion and the feasibility of  installing structures to manage the shoreline. The City has implemented a physical monitoring program to  collect beach surveys and has evaluated the condition of the submerged breakwaters and their  effectiveness of mitigating end losses north into Golden Beach. APTIM is a proponent of responsible  beach management and supports these efforts. We recommend the development of a robust Beach  Management Plan to support the short‐ and long‐term management of your shoreline that will  incorporate all of your previous efforts and identify new, valuable projects. We have developed these  plans for many Florida municipalities. The plan will allow you to be proactive, rather than reactive, when  addressing your marine and coastal engineering needs. Many of the concepts and strategies used by  other municipalities could be applied to the City’s shoreline to the benefit of all stakeholders.  The Beach Management Plan would clearly identify the City’s objectives for coastal management  including stakeholder engagement, timeframe, and purpose. The Plan may include a coastal process  assessment using the latest numerical models to evaluate littoral transport, sea level rise, or coastal  flooding based on new data. A storm vulnerability evaluation can also be incorporated, which is an  invaluable tool to quantify the current level of storm protection in the City and identify areas for  improvement considering climate change. A cost‐benefit analysis can be used evaluate the capital  expense of structures, continued beach nourishment through the Federal project, or consider the value  of City‐sponsored beach projects. Other components may also include: identifying additional funding  opportunities, a hurricane preparedness plan, waterfront park development/improvements, bulkhead  condition assessments (asset management), and integration with the City’s Comprehensive Plan.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  7  01C032018D    General Technical Approach The purpose of this section is to outline the proposed approach for conducting Marine and Coastal  Engineering consulting services for the City. The approach described below is based on APTIM’s  understanding of the City’s needs, outlined above, and our extensive experience in the planning, design,  permitting, construction management, and post‐construction monitoring of many coastal, waterfront  facility, and infrastructure projects within the state of Florida. APTIM uses the same general approach to  all of our projects, but fine‐tunes the approach to address the specific scope and scale of each of project  and Client.  The primary focus of this technical approach will be to provide an overview of the process APTIM applies  to marine and coastal engineering projects so they can be planned, funded, designed, permitted,  constructed, and monitored in a thorough manner within the defined project scope, schedule, and  budget. These potential projects include, but are not limited to, beach nourishments, docks, seawalls,  marinas, boat ramps, dredge and fill, coastal structures, and mooring systems. This approach is applicable  to newly identified waterfront concerns and needs along the City’s shoreline. A breakdown of the  potential work to be provided by APTIM follows:  Permitting and Agency Coordination We believe that early and thorough planning and coordination with our clients and regulatory agencies  leads to a smooth permitting path and a successful project that meets project goals while avoiding  environmental impacts. At project inception, our multidisciplinary team of APTIM professionals will work  with the City to define your project goals and identify the challenges, funding strategy, stakeholders, and  permitting path to design and implement a successful and cost‐effective project. Our experience and  familiarity with the environment in Miami‐Dade County and working with other coastal communities will  provide a strong basis to plan the most efficient path forward on your projects. It is important to  understand the environmental setting of each project and evaluate existing natural resource data in order  to determine what updated environmental assessments and surveys may be needed in order to plan and  permit the project. For instance, while historical data might show the presence of hardbottom in the  footprint of a proposed beach nourishment or artificial reef, an updated survey could show that those  resources are covered, no longer present, or have decreased in extent. Similarly, for projects in the  Intracoastal Waterway, seagrass resources may have moved or grown in extent over time, in which case  an updated survey would delineate the current conditions. The location and condition of submerged  resources can affect the design and permitting process for the project. In addition to the environmental  setting, we know that it is also critical to understand the local attitude and desired outcomes of the  residents.  Next, based on the proposed project, location, and natural resources in the area, we will chart out the  state and federal agencies that will be involved in the permitting for the project. We have experience in  obtaining local permits from Miami‐Dade County Environmental Resources Management, formerly  Division of Environmental Resource Management (DERM). We also have experience obtaining state  permits under the Joint Coastal Permitting (JCP), Coastal Construction Control Line (CCCL), and  Environmental Resource Permitting (ERP) programs, which typically require close coordination with the  Florida Department of Environmental Protection (FDEP), the South Florida Water Management District  (SFWMD), and Florida Fish and Wildlife Conservation Commission (FWC). We have strong ties with the  U.S. Army Corps of Engineers (USACE), having worked with project managers in their West Palm Beach  office on numerous marine and coastal projects in southeast Florida. Through our extensive project  experience, we understand expedited paths to local, state, and federal authorizations for our projects,  such as Nationwide Permits (NWP) and the State Programmatic General Permit (SPGP). We also recognize  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  8  01C032018D    that formal consultation with U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries  Service (NMFS) often leads to lengthy delays in permitting. Therefore, whenever possible, we try to  design projects that will qualify for authorization under regional Biological Opinions (BO’s) for endangered  species and their critical habitat. Identifying and utilizing streamlined permits and consultation will help  us to obtain state and federal authorizations for the City’s projects in a cost‐efficient and expedited  manner. We understand that there are areas of hardbottom located offshore of the City, which provide  essential fish habitat (EFH) and potentially support threatened coral species. These resources affect  regulatory actions by requiring greater oversight and coordination by local, state, and federal agencies.  APTIM has experience designing and permitting projects in the vicinity of hardbottom in south Florida,  and will use this experience to help address agency concerns to prevent delays in permitting.  We approach every project with the design goal of avoiding adverse effects to natural resources, but in  some cases, successful marine and coastal projects involve some degree of unavoidable environmental  impacts. In these cases, our biologists work closely with state and federal agencies to develop mitigation  and monitoring programs. We have worked closely with FDEP and NMFS biologists to design hardbottom  mitigation projects throughout Florida and to monitor artificial reefs to document their colonization by  fish and benthic organisms. If the City requires a  marine project in an area of sensitive resources, our  design team will work to avoid impacts to the  maximum extent practicable, but will develop a cost‐ effective and successful mitigation solution if impacts  cannot be avoided.  In addition to the need for state and federal permits,  our projects may also require local permits and must  adhere to local ordinances and rules. We recognize  that Miami‐Dade County and the City have codes,  resolutions, and ordinances that help to ensure that  projects align with the local values and vision. APTIM  will work with the City to design, permit and  implement projects that meet your needs while  balancing project needs with the protection of  natural resources.   Environmental Assessments and Monitoring Identifying natural resources is vital to the successful design and permitting of each project. The approach  that we take in providing environmental services for each individual project starts with early coordination  with clients and agencies to provide baseline data and environmental documents to facilitate and often  expedite the permitting process. The presence of hardbottom, seagrass, endangered species and their  designated critical habitat, as well as the location of a project within Outstanding Florida Waters (OFW),  can have important implications to the design of a marine or coastal project. For each project we design  for the City, we will start by researching available historical and recent environmental site data, including  analysis of aerial imagery for detection of potential submerged resources. Following a desktop review of  environmental data, APTIM biologists will conduct an on‐site environmental assessment, if needed, to  document current site conditions.   We understand that Miami‐Dade County staff have conducted nearshore hardbottom and artificial reef  monitoring throughout the County in support of the beach nourishment program in compliance with    APTIM biologists conduct benthic resource surveys in  support of project design, permitting and permit  compliance.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  9  01C032018D    permit requirements. However, if the City is ever in need of additional support, our marine biologists have  extensive experience developing and implementing hardbottom and artificial reef monitoring programs in  association with beach nourishment projects on the Atlantic and Gulf coasts of Florida. We have FDEP‐ approved biologists on staff, and utilize our own research vessels, boat captains, support divers and in‐ house sampling gear to conduct marine benthic surveys and habitat delineation for our clients.  APTIM biologists are highly skilled and specifically trained in scientific data collection in Florida’s coastal  and marine habitats. We have conducted numerous hardbottom, artificial reef and seagrass surveys in  support of dredging, nourishment, seawall construction and repair, marina development, and boat ramp  construction and reconstruction. Depending on the City’s specific project needs, our team can survey,  map, and characterize benthic resources that may occur in the project vicinity. In cases where the City  might want to replace a seawall or bulkhead, our biologists can survey the structure to document any  biota (such as stony corals, octocorals, and oysters) present. We will coordinate our survey protocol with  appropriate state and federal agencies to ensure survey results will be acceptable in support of project  design and permit applications.   When conducting surveys of hardbottom and artificial reef resources, we utilize the Benthic Ecological  Assessment for Marginal Reefs (BEAMR) methodology, which APTIM biologists developed in 2004 to  characterize the hardbottom and reef resources in south Florida. This method assess changes to the  biological communities as well as sedimentation on natural hardbottom or artificial reefs. The BEAMR  method is now considered an industry standard and  is recognized by state and federal agencies for  resource characterization and project effects  determinations. Our biologists also routinely conduct  fish population assessments on natural hardbottom  and artificial reefs using transect counts, stationary  counts, and timed swim (rover‐diver counts). For  seagrass surveys, we typically employ the Braun‐ Blanquet index methodology, which allows us to  quickly survey a large area of seagrass by using a  scale of numbers that are proportional to area  covered by each species identified. These data  provide species‐specific abundance and distribution  data, which can then be analyzed for potential  project‐related community changes or as a tool for  mitigation planning.   APTIM biologists work for our clients from project  inception in support of permitting, design, mitigation planning, and pre‐, mid‐, and post‐construction  monitoring. State and federal permits typically require long‐term environmental monitoring to ensure  coastal projects do not negatively impact valuable habitat or species. We not only design and implement  hardbottom, artificial reef, and seagrass monitoring programs, but we also assist our clients in  coordinating other permit‐required environmental monitoring such as sea turtle and shorebird  monitoring. We understand that Miami‐Dade County staff conducts the annual sea turtle monitoring in  the City under the direction of Teal Kawana, Project Manager, who holds the FWC turtle permit for the  County. We will coordinate with the County staff to ensure sea turtle monitoring and shorebird  requirements continue to be met for any future City projects.     APTIM biologists routinely monitor natural  hardbottom and artificial reefs.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  10  01C032018D    Physical Data Collection The purpose of this task is to acquire the physical data  on the coastal processes necessary for the design of  coastal protection projects. Physical data may include  topographic and bathymetric survey, geotechnical  data, wave climate and historical winds, and aerial  photography. This data will be used to develop the  design criteria that will govern the final design of the  project. Where possible, any previously collected data  and analysis will be used in lieu of new data collection  as a cost saving measure.  Due to the detailed needs of designing waterfront  projects for permitting and construction, updated,  site‐specific data collection efforts are to be  anticipated. APTIM has extensive field data collection  capabilities. Our survey group can determine the  scope of the required data, collect and reduce the  data, incorporate the data into a GIS system, and  apply the data in support of the project permitting and design. Employing our own field data collection  group allows the project managers to more closely control the scope, timing, and most importantly the  quality of the data collection efforts. The following is a description of how we would approach collecting  the various data sets:  Bathymetric and Topographic Surveys Our surveyors have an extensive history of surveying in  south Florida. We also review newly collected data with  historic data as part of our QA/QC protocol. We own  and operate RTK (real time kinetic) GPS equipment,  which is the most efficient, accurate, and cost effective  surveying technique. We also ensure that there is an  overlap between bathymetric data collected using a  rover and data collected using hydrographic techniques.  This provides another level of data quality assurance.  Most waterfront structure design requires surveys  extending beyond wading depth. APTIM owns and  operates survey vessels capable of performing single  beam or multi‐beam bathymetric surveys. The boats are  also equipped with an RTK system that provides  centimeter level horizontal positioning accuracy and  when combined with our heave, pitch, and roll  compensator, provides excellent vertical accuracy.  This also avoids the need to tide correct data, resulting in efficient data reduction. Our survey crew is  experienced in surveying nearshore and inshore waters, borrow areas, and inlets.  APTIM also has extensive experience with the collection, reduction and analysis of LiDAR data. This data is  collected from an airplane and collects a bathymetric point at densities that can exceed one point every  Topographic survey of coastal structure.    APTIM conducts offshore biological monitoring and  bathymetric surveys using in‐house research vessels  and staff.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  11  01C032018D    foot. APTIM was previously contracted to collect LiDAR data offshore of Palm Beach, Broward, and Miami‐ Dade Counties. This data extended offshore to approximately the 120‐foot contour. The USACE also  contracted APTIM to assist in the reduction of their LiDAR  data sets.  While LiDAR data provides comprehensive bathymetric  and topographic data, collection of the data can be quite  expensive. The data can be used to supplement inlet and  nearshore bathymetry. We would track state or county  plans to collect additional LiDAR data in the City. Collection  of LiDAR data is sensitive to water clarity so timing of the  data collection is important, especially around inlets, since  tidal flows can cloud the water. Ideally, LiDAR should be  collected during a neap tidal cycle.   Recently, our team has expanded our service offerings with advanced laser scanning technology and  drone use. APTIM owns and operates Faro X330 terrestrial laser scanners and multiple drones. APTIM has  deployed these systems in a wide variety of environments for the scanning of existing topographic and as‐ built conditions, photo/video documenting of construction progress, and monitoring coastal conditions.  The scanning system allows for the rapid collection of millions of data points, at a resolution of up to one  point every 0.055 inches at 30‐foot scan distance. The scanner also contains an internal camera, which  allows for photographs in real color red‐green‐blue values to be transposed onto the 3D point cloud. With  the use of RTK GPS and a reflectorless total station, scan data can be repeated in future surveys.    APTIM’s drone fleet includes DJI’s Phantom III, IV,  and Inspire 1 Pro.    APTIM routinely utilizes drone technology for post‐storm damage evaluations and shoreline assessments.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  12  01C032018D    Hydrodynamic Data Collection The purpose of collecting hydrodynamic data is to  identify coastal processes in a specific area that would  contribute to the design of a project. Additionally,  collected hydrodynamic data is used to calibrate and  verify accuracy of the numerical modeling efforts  utilized in the beach nourishment and coastal  protection project design phases. Hydrodynamic data  collection typically consists of deploying Acoustic  Doppler Current Profilers (ADCPs) to measure waves  and currents in nearshore areas and within inlets.  APTIM owns and operates ADCPs. APTIM has divers  that deploy and recover the gauges that can be set to  collect data for as long as two months. Typically, a pair  of devices is deployed to show the propagation of  waves from offshore into the nearshore and through  the inlets. We have used this method in modeling and  permitting on previous projects. ADCP data can also be  used to evaluate seasonal variations of small‐scale boat wakes for use in the design of marinas and  mooring systems.  Underwater Structural Investigations APTIM engineers have extensive experience  performing underwater structural investigations of  waterfront structures across Florida. Our designated  Project Manager for this RFQ, Jordon Cheifet, PE,  previously performed an underwater structural  investigation of the nearshore breakwaters in the City.  A thorough underwater evaluation can be conducted  to determine the existing or baseline condition,  recommend and prioritize maintenance and repair  actions, determine the suitability and serviceability for  specific uses and loads, evaluate life safety, improve  durability, enable historic preservation, establish a  baseline condition for change of ownership or legal  purposes, or to quantify post‐storm damage. Our  team of engineer‐divers can perform engineering assessments of the City’s waterfront infrastructure  including breakwaters, seawalls, piers, boat ramps, marinas, and mooring systems. Underwater structural  investigations performed prior to beginning the design process or as part of a regular maintenance  program can introduce potential cost‐savings to the City’s waterfront facilities.  Marine and Coastal Engineering For over 30 years, APTIM's engineers have designed and managed the construction of over 100 marine  and coastal engineering projects including docks, seawalls, and dredge/fill projects. We will apply this  experience and understanding of marine and coastal construction to the City’s projects. Typical projects  for APTIM include the following:  APTIM divers have experience deploying ADCPs for  hydrodynamic data collection.    Underwater structural evaluations of severely  deteriorated municipal dock.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  13  01C032018D    Docks APTIM has designed docking facilities for many municipalities around the State of Florida. These projects  have ranged from 150 feet of timber dock at Curtis Park in Miami (Miami‐Dade County) to replacement of  docks at a 77 slip marina at Founders Park in Islamorada (Monroe County). APTIM’s dock designs  incorporate marine‐grade products to provide durable, long‐lasting projects. APTIM also designs docks  that can be easily built by qualified marine contractors to minimize project delays and change orders.  Seawalls APTIM designs, permits, and assists with construction administration of bulkheads and seawalls. These  projects have ranged from a 600‐foot long Intracoastal Waterway bulkhead in Delray Beach to the seawall  replacement design at the Ringling Museum in Sarasota. We designed and assisted with construction  contract administration of the Seawinds Condominium (Singer Island, Palm Beach County) where a 900‐ foot long oceanfront seawall was constructed of steel sheet piles with a drilled tie back anchor system.  Dredge/Fill APTIM has experience in designing and evaluating cost‐effective dredge and fill projects. This includes  dredging and dredge material disposal alternatives to achieve both navigational and environmental  improvements in canal and river settings. Beach nourishment and dune restoration projects are a  specialty of APTIM’s engineers. We understand the entire process to design, permit, and monitor these  projects. We routinely develop borrow area designs for beach nourishment and navigation channel  projects where the sand quality must meet strict state‐required compatibility criteria for placement on  shore. Dredge designs consider sediment characteristics and contaminants, cultural resources,  environmentally sensitive areas, and hazards. Offshore sand sources in Miami‐Dade County have recently  been exhausted and projects have turned to upland (truck haul) sand sources. APTIM engineers routinely  visit the local mines to evaluate stockpiled material for beach compatibility for beach nourishment  projects. APTIM has an in‐house laboratory for sediment characterization, and uses an outside source for  chemical testing. Our expertise is applicable to potential projects described in the City’s RFQ.  Environmental Engineering APTIM’s technical approach to environmental engineering was forged through years of experience as an  environmental engineering and consulting firm, and as a collaborative team member with our state and  local clients. We intend to not only accomplish the scope of services described in RFQ 18‐02‐01, but to  exceed City’s expectations in doing so. APTIM has collaborated with FDOT, FDEP, and DERM management  teams to optimize contract performance, and to efficiently meet their needs and priorities.   The technical approach to this contract requires more than just a method; it will be accomplished by a  team with the requisite knowledge and skills. APTIM’s Contract Management Team and its supporting  resources possess those skills more than any other firm does. Our combination of technical competency  with capabilities in field construction and project management makes our team unique. APTIM’s local  Environmental Engineering Management Team has a combined 50 years of local regulatory experience.  That experience includes all types and levels of various environmental engineering projects with the  practical application of complex science and engineering principles.   We stay abreast of local and national environmental regulatory issues through state activities and  through membership and active participation on several industry organizations. We also hold Miami‐Dade  County Professional Pre‐Qualifications in several environmental engineering‐related categories; further  evidence of APTIM’s technical proficiency.     City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  14  01C032018D      APTIM is also one of a very few environmental engineering contractors with corresponding contracts with  the FDEP under the Petroleum Restoration Program as an Agency Term Contractor and a Dry Cleaning  Hazardous Waste Program Contractor. We have the experience and eligibility to seek FDEP funding and  program assignment to City projects that may eliminate or reduce cost to the City under the FDEP closure  guidelines. APTIM not only has the technical expertise and experience to perform the scope of services  required for this RFQ, but we have the right people and the capacity to get it done!   Project Engineering Design Every project location in coastal environments is highly site specific and designing waterfront structures  requires in depth understanding of not only structural and geotechnical engineering but the coastal  processes (wave climate, water levels, currents, sediment transport rates and directions, etc.) affecting  the particular project site. Our experience working in South Florida is very useful in understanding these  processes at a holistic, regional scale and can be used where possible to minimize rework during the  project design phases. Empirical and desktop engineering design and modeling will be used where  feasible to minimize project costs and expedite project schedule. However, additional numerical  modeling may be necessary to closely manage the design details and evaluate the performance of a  potential project.  APTIM applies the provisions of local and state building codes to provide safe designs that can be easily  permitted. We also continuously monitor Florida Building Commission publications for recent Declaratory  Statements that may allow additional design flexibility. APTIM engineer’s use industry‐standard structural  modeling software for the design of waterfront structures including CWALSHT, ProSheet, and SPT97. Our  engineers are highly capable in the area of coastal engineering numerical modeling, having the state‐of‐ the‐art models and the required expertise to correctly run each model, such as Delft3D, GENESIS, REFDIF,  SWAN, CCCLA, SBEACH, and others. We often use the Delft3D model for coastal evaluations as it is  considered the most complete model available. It includes most of the relevant physical processes  required to conduct an accurate prediction of wave transformation on the nearshore habitat. The Delft3D  SWAN model accounts for wind growth, wave breaking, whitecapping, wave refraction, bottom friction,  wave current interactions and diffraction, which are all important processes to consider.   Design Plans and Specifications APTIM takes a multi‐phased approach to the development of design plans and specifications to optimize  project schedule and budget while also considering stakeholders. The first step in the design process, the  Conceptual Design Phase, develops a complete understanding of the specific project objectives and goals  in coordination with the City once a potential project is identified. This process includes the review and  assessment of all available historical data and collection of new data to support the needs of the  proposed project. This information, along with a summary of the design criteria to be used in conducting  the preliminary and final engineering design work and the proposed project schedule will be summarized  in a memorandum of project understanding and basis of design document.  The second phase in the design process, the Preliminary Design Phase, includes development of a project  layout and cross‐sections of all elements of the design concept. Preliminary design of waterfront  structures may include structure lengths, elevations, materials, and foundation requirements. Preliminary  quantities of all major materials and construction items will be calculated.  A preliminary design report with 30% level design plans will be developed and submitted to the City. It  will summarize the review of the existing data and describe any new field data collected, as well as  present the results of the engineering analyses. This includes approach, methodology, and proposed  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  15  01C032018D    features identifying all project components that may have a significant impact on project execution,  permitting, and costs.  The third phase in the design process, the Final Design Phase, includes development of construction plans  and specifications. Marine and coastal engineering project plans will include existing site surveys,  structural plan views, cross‐sections, and structural details. The structural details provide vital information  to marine contractors to minimize Requests for Information (RFIs), Change Orders, and project delays.  The plans will also include information related to site access, staging areas, and other information  required for construction of the waterfront project. The plans will incorporate information concerning  site survey control, which may be used for constructing the waterfront project.  The plans and specifications for the construction of the waterfront projects will be prepared for bidding  for construction. APTIM staff will coordinate with the City to ensure that the technical specifications will  incorporate any requirements from the City for the bidding process. The specifications will provide  sections addressing general conditions, technical provisions, and environmental protection. Specifications  will also incorporate all permit documents requiring contractor compliance with permits through  reference. Also incorporated into the documents will be any geotechnical information for the contractor’s  use. Our plans and specifications will provide detail required by the marine construction contractors to  competently bid and construct the project.  Construction Cost Estimates and Bidding Assistance APTIM has a thorough understanding of marine construction and has established long‐standing  relationships with marine contractors across the State of Florida. APTIM continuously monitors the  Florida Department of Transportation published pricing data for current unit prices on heavy construction  projects. APTIM uses this information to assemble an Opinion of Construction Cost for each project to  assist with budgeting. The cost estimate generally includes mobilization/demobilization cost, material  cost per unit, and bond costs for the waterfront project. APTIM will contact potential marine construction  contractors to evaluate project costs based on recently bid projects, construction contractor and  equipment availability, material location, and additional construction requirements.   For each project, we will assist the City with preparations to bid the project for construction. We will  obtain the City’s "boiler plate" contract documents for incorporation into a complete package to bid the  project. The bidding documents will include the City’s front end documents, the specifications (including  General Conditions, Technical Specifications, and Environmental Provisions), and the project plans. We  will coordinate with the Purchasing Department of the City to implement the bidding of the project. We  will provide the Purchasing Department names of qualified marine construction firms for waterfront  structures to ensure that capable contractors are aware of the project. Because of our extensive past  experience of managing successful marine and coastal protection construction projects, we are very  familiar with the contractors capable of constructing such specialized work.  APTIM will prepare for, and attend, the pre‐bid meeting for the project to discuss the project and clarify  particular aspects of the project. If necessary, following the pre‐bid meeting, APTIM will prepare addenda  to the plans and specifications for review by the City. If acceptable, the addenda will be sent to all  registered bidders and will become part of the bid package and subsequent contract documents.  We will review the bids presented to the City for the proposed work. In addition to cost factors, the bids  will be reviewed for technical completeness, contractor experience, work plan, schedule, and other  parameters deemed important. As appropriate, APTIM will contact the contractors’ references and make  a final recommendation to the City on the award to the lowest cost, qualified, and capable bidder.    City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  16  01C032018D    APTIM will prepare for, and attend, the pre‐construction meeting to coordinate with the contractor, and  as required to address the project and permit requirements, review the construction methodology,  technical specifications and schedule, address construction access and work areas, any specific  conditions, and monitoring requirements. These items will be discussed with the contractor, contractor's  associated sub‐contractors, environmental regulatory agencies, and other involved parties.   We will coordinate communication and reporting protocols for the duration of contractor mobilization,  construction, and demobilization activities.  Project Construction Administration and Observation Services APTIM brings complete marine and coastal engineering project construction administration and  observation experience to the City. General services include contract and permit administration, agency  and contractor coordination, plans and specification administration, construction supervision, quality  control/assurance through daily reporting and various engineering services to monitor the project progress,  contractor invoice review and recommendation, project completion certification, and public contact as  required by the City and other elements of the project. The extent of services can be tailored to support the  City’s needs. Some clients have requested a site observer 24 hours per day, while other clients select to  have an observer only visit once or twice per week and shoulder more of the day‐to‐day details with in‐ house staff. We will observe the project construction process to determine if the contractor is in substantial  compliance with both contract documents and project permits. If not already being performed by the  contractor, APTIM can also conduct any water quality, protected species, and daily sediment quality control  monitoring required.  Our technical personnel are trained and experienced in understanding compliance observation of marine  and coastal engineering projects. APTIM will review all contractor submittals and will notify the  contractor, the City, and the permitting agencies, as required, of any inconsistencies or problems with the  submittals. APTIM will provide periodic reports to the City that summarizes the progress of construction  and compliance with the permit and contract, including, but not limited to, equipment issues, problems  encountered during project construction, methods to correct problems, success in problem correction,  errors, omissions, or deviations from the Contract  Documents, and weather conditions that may have  affected project construction. APTIM will also review  project invoices and change order requests and  provide recommendations to the City.   APTIM will attend periodic progress meetings with  the Contractor and regulatory agencies as  appropriate during construction. We are very familiar  with the latest sediment QA/QC, dredge monitoring,  and environmental monitoring methods and  requirements.  Post-Construction Services APTIM will continue to assist the City beyond the  construction phase of your projects. Depending on  the project, state and federal permits may require  post‐construction physical and/or biological monitoring to ensure the project performs as designed  without unanticipated environmental impacts. We can perform comprehensive post‐construction  surveying and reporting to meet your specific project needs. In cases where projects involve unavoidable  APTIM provides oversight of coastal construction  projects throughout Florida and the U.S.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  17  01C032018D    impacts to natural resources, such as seagrass, our biologists will monitor the mitigation to document the  functional success of offsetting those impacts.  Some projects may not have permit‐required post‐construction surveys, but the City might choose to  develop a regular underwater inspection program for your existing and future waterfront structures.  APTIM can assist in the development and implementation such a program which can extend the service  life of existing structures and facilitate the City 's budgeting for the repair and replacement of this  infrastructure.  Funding Assistance Projects along the City’s shoreline and adjacent inlets have been funded by multiple sources including the  Federal Government (through the USACE), the State of Florida (through the FDEP), Miami‐Dade County,  the Florida Inland Navigation District (FIND), and the City itself. We recommend that the City continue this  approach of open communication and coordination with these public entities. APTIM has experience in  tracking these various funding sources for a variety of clients as well as additional funding options.  While not typical for smaller‐scale waterfront structures, obtaining funding for a project from the Federal  government is the most complicated and time‐consuming process of the potential funding authorities  listed above. However, Federal funding can be significant. APTIM can monitor, review, and apply on the  City’s behalf for any applicable funding available through the USACE.   The State of Florida provides funding for waterfront projects through the Beach Management Funding  Assistance (BMFA) Program, FWC Florida Boating Improvement Plan, FWC Boating Infrastructure Grant  Program, RESTORE act, and other similar marine‐related grant programs. APTIM can provide the data  needed to support funding requests on behalf of the City, as needed.  APTIM has extensive experience APTIM developing storm impact analysis reports to support the securing  of FEMA Public Assistance disaster relief funding for our municipal clients. We have successfully obtained  Project Worksheets for the City of Deerfield Beach, Manatee County, and Indian River County for  damages associated with Hurricane Hermine, Matthew, and Irma.   Project Management APTIM has built its stellar reputation by satisfying the needs of clients throughout the state and the  country. The majority of our work comes in the form of indefinite delivery/indefinite quantity (ID/IQ)  contracts that require the ability to react to as‐needed task orders that often come concurrently, involve  multiple disciplines, and are to be performed in different locations. APTIM’s project management  procedures support this profile of service and allow our teams to excel in their work delivery by  controlling cost and schedule, while simultaneously enhancing value and quality.  Our APTIM Management System (AMS) contains policies, processes, procedures, work instructions, tools  and supporting documents describing the way APTIM is to execute work activities. AMS represents  APTIM’s best work practices and is continually improving as the company pursues “Excellence in all we  Do.” This forms the basis for our Quality Assurance/Quality Control plan as it covers all facets of a project  from the proposal stage to final close‐out of the project.  While AMS represents APTIM’s baseline methodology for executing business and projects, we recognize  that each project is unique according to the dictates of the contract and task specifics. Our team will  apply APTIM’s proven, highly successful project management system to control all aspects of contract  delivery to meet the City’s goals. The primary features of our project management and control system  include:  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  18  01C032018D     A formal, documented project delivery system based on Project Management Institute guidance.   A fully integrated project control system that combines commercially available software and  customized proprietary systems for estimating, tracking, controlling cost and schedule, and  measuring technical progress.   A proven task delivery system with the Project Manager as the single point of contact, responsibility,  and authority for all project matters.   Complete project support capabilities, including fully compliant quality assurance, health and safety,  procurement, contract administration, and project controls functions implemented by experienced,  dedicated staff.    Program Delivery and Interaction with the City APTIM trains its personnel in our Project Delivery  System (PDS), which provides the framework for  Project Managers to lead a project through its  entire lifecycle: initiating, planning, executing,  monitoring and control, and closing. The objective  of the PDS is client satisfaction through  performance excellence. The focus of the system is  facilitating the highest possible quality in every  aspect of a job. Our PDS has been implemented on  thousands of projects, and generally follows a  flexible management style, meaning that there are  rigid centralized company controls but the project  has autonomy for entrepreneurship and innovation  depending on the needs of a specific client or  project. This process is illustrated in Exhibit 1.  Our project managers monitor and evaluate  technical, cost, and schedule performance within a  single integrated project baseline and can quickly  evaluate progress and make course corrections to  ensure project objectives are achieved.   Project management support includes timely  reports resulting from our project controls system  that include tracking progress, updating schedules,  financial execution, and numerous other elements  we routinely monitor to assess progress for our  clients. Successful project management and client  satisfaction requires close communications. We  EXHIBIT 1:  APTIM’s PDS meshes perfectly with the City’s Service  Authorization method of work ordering.    APTIM BENEFIT  APTIM’s methodology for implementing its effective project management and oversight is  to involve the right personnel and equipment for the tasks‐at‐hand and to train and  support managers with information tools and procedures to ensure success.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  19  01C032018D    understand that the City is at the helm and that it never wants surprises from its consultants either in the  performance of their services or in helping to foresee obstacles or increased risks that might impact the  goals of the City. The APTIM Team’s communications protocols and proactive consultancy will keep the  City’s best interests in the forefront. For example, on the City of Deerfield Beach Storm Berm  Nourishment project, continuous communication with the City was needed early in the project to meet  permit submittal deadlines and strategically determine the proper environmental permitting path to  pursue given a changing sand source. APTIM’s flexibility and continuous project management allowed us  to quickly change course and to deliver the proper permit type within a reasonable timeframe and within  the existing contract framework. We will use multiple methods of communications including written  reports, phone calls, and email.   With our team located close by, we find face‐to‐face meetings are also beneficial for developing project  scopes and discussion at key project milestones. We are also available to attend and present at City  Commission meetings as needed.   Project Planning Upon receipt of the task order, the critical path schedule dictates the sequence of tasks, such as public  involvement and education, design approvals, environmental impacts, permitting, and bidding. A  successful project begins with the development of a detailed scope that properly defines the goals and  objectives, and clearly identifies the tasks involved to accomplish those goals and objectives. Upon the  agreement of a project scope, a work plan is developed that assigns a schedule to every task required in  the project’s life‐cycle. With the proper planning and dedication to adhering to that critical path plan,  surprises are kept to a minimum. Unforeseen circumstances happen, but by applying a proactive  approach to define the obstacle and presenting alternative solutions to mitigate the impacts of the  obstacle, time and cost impacts are avoided. APTIM uses the same general approach to all of our projects,  but fine‐tunes the approach to address the specific scope and scale of each of project.  As the City identifies work that it needs accomplished, APTIM’s management team will identify which  team members are required to complete the task and coordinate to develop a detailed scope of work and  budget. The Project Manager, with input from key team members, will develop a Project Work Plan that  acts as the blueprints for the project, including manpower, equipment scheduling, and a timeline for  deliverables.  Protecting our clients’ budget and schedule are important elements of project delivery. For the City,  APTIM will respond to all requests given with immediacy. Upon receiving a notice to proceed, our staff  will commence work to meet the identified timeline for deliverables.   Before beginning work, and at regular intervals thereafter, APTIM will work to develop and adapt (if  necessary) a project timeline for deliverables that meets the City’s needs. Depending on the complexity of  the project, which may involve many disciplines over a long period of time, the project’s Work Plan may  activate internal systems for continued control. Regular informal updates or formal reporting will be  provided to the City as a project progresses depending on the needs of the project and the City.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  20  01C032018D    Sub-Consultant Management APTIM applies high standards in choosing subcontractors for our teams. Each subcontractor must show  safety records, proper licensure, insurance, and financial stability. Our subcontractors are subject to the  same safety and performance quality rigors as our own staff.   APTIM’s experience with the City and our choice to use experienced sub‐consultants eliminates the  learning curve and allows us to provide continuous, seamless integrated services. The Project Manager  will be in continuous communication with each subcontractor to ensure the proper scope has been  defined, the budget and schedule are being satisfied, and project deliverables are of the quality the City  has come to expect from APTIM.  Quality Assurance/Quality Control APTM’s quality assurance/quality control program is more than just words; it represents a company‐wide  commitment to our clients that every aspect  of a project will be complete as requested  following established guidelines, plans, and  best management practices. APTIM has  standard operating procedures that address  virtually every aspect of our work and ensure  consistent, quality work products for any  project requirements (Exhibit 2).  In providing our services to the City under this  contract, quality assurance will involve  reviewing sub‐consultant deliverables to  confirm they meet APTIM’s and the City’s  expectations. Quality control steps will be  implemented routinely throughout the project  using manual and automated methods  including commercial and proprietary tools  including sampling procedures/analytical test  methods in accordance with established  industry standards and continuous review of  internal work products. APTIM measures  quality through the accuracy, consistency,  comprehensiveness, and understandability of  deliverables, which also must meet City  expectations.   APTIM understands that a project is not complete until a concise, thorough, and most importantly, an  understandable report is delivered. Our staff is experienced in developing reports that meet the needs of  our clients and regulatory reviewers and approvers. Our staff includes word processing specialists and  technical editors. Each deliverable is subjected to a stringent quality control review. Before final  reproduction, the document receives a final review by technical staff and the Project Manager. APTIM  can provide paper copies and electronic deliverables per the project scope. We develop standardized  templates for use in our reports. This enables consistent formatting and efficient production. We use the  latest in software and maintain high speed, high quality printers to ensure our deliverables are efficiently  produced.   EXHIBIT 2:  APTIM’s carefully developed reports with repeated reviews of  the data collected. They undergo editing and expert review  before delivery to our clients.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01        Aptim Environmental & Infrastructure, Inc.  21  01C032018D    Safety Safety is a core value at APTIM, born of the belief that workplace accidents are preventable when staff is  properly trained and prepared for their tasks. To this end, our firm focuses on safety in a number of ways.  Meetings, conference calls, or other gatherings begin with a safety moment so that all individuals develop  a mindset and are rewarded for safety communications. Before personnel enter the field, they participate  in a tailgate meeting where they discuss the day’s work, possible hazards and their mitigation, proper  tools, and the location of emergency health facilities. In our work in Florida, the heat index and lightning  storms receive extreme vigilance in order to keep teams safe. Every employee carries a safety card that  empowers him/her to call a work shutdown if they  observe unsafe practices.  As a result of our safety efforts, APTIM maintains one  of the lowest Experience Modification Rates (EMR) (a  measure of safety performance) in the industry, as  illustrated in Exhibit 3. We also utilize an established  Dive Safety Program for all underwater work, which  exceeds OSHA and AAUS standards.  Invoicing APTIM’s accounting department will prepare monthly  invoices for services rendered during the previous  month on a percent complete basis for lump sum  contracts or hourly for time and materials contracts.  Proposals and subsequent invoices will be based on  the approved rates and classifications for the Master  Agreement established for this continuing services contract. The Project Manager will review all invoices,  including those of other team members, before they are issued to the City for accuracy and  completeness.    EXHIBIT 3:   APTIM’s historical EMR is below the industry average    01C032018D E . Q U A L I F I C A T I O N I N F O R M A T I O N A N D A S S I G N E D P E R S O N N E L E. QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  22  01C032018D    E. QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL  Background of the Team Members We carefully selected an experienced team to bring the City the highest quality services in the marine and  coastal engineering disciplines described in the RFQ. APTIM’s multidisciplinary team has extensive project  experience working together to successfully complete coastal projects for our clients. Our in‐house  coastal engineers, biologists, geologists, surveyors and GIS/CAD staff work together to successfully  permit, design, construct, and monitor numerous marine and coastal projects for counties and  municipalities on Florida’s Atlantic and Gulf coasts. APTIM’s multidisciplinary approach is supported by  specialized sub‐consultants to address the City’s specific coastal needs described in this RFQ. We are  confident that our exceptionally well‐qualified and experienced team can meet or exceed all the  requirements of the City’s scope of services.  Aptim Environmental & Infrastructure Inc. Description of Firm Since 1984, APTIM has provided professional marine  and coastal engineering, hydrographic and geophysical  surveys, and environmental services to our clients. We  have earned an excellent reputation with local, state,  and federal agencies responsible for permitting and  overseeing marine and coastal programs. For over 30  years, we have designed, permitted, provided  construction administration, and conducted permit  compliance monitoring for more coastal and marine  projects than any other private engineering firm in the  United States. We have designed over 90 beach  nourishment projects and over 30 coastal structure  projects for municipal, state, and federal clients  throughout Florida, up the Atlantic seaboard, and the  Gulf coast (Exhibit 4). Our extensive list of repetitive  and long‐term clients is a testament to our work and  commitment to excellence.   Along the Atlantic seaboard of Florida, our team of  professionals has worked with Miami‐Dade County,  Broward County, Palm Beach County, City of Miami,  City of Delray Beach, Town of Hillsboro Beach, City of  Deerfield Beach, and the Town of Palm Beach on a number of large and small scale shoreline stabilization  and restoration projects (ocean and bayside), as well as inlet management projects. The breadth of  experience gained from these projects has provided our professionals with the knowledge and expertise to  provide the City with solutions to marine and coastal issues.   Our decades of experience collaborating with municipal and county governments has instilled a  responsibility to address each project with technical excellence, environmental consciousness, cost  effectiveness, and public tax dollar budget‐mindedness. We pride ourselves on developing cost effective  designs that meet requirements of regulatory and resource agencies, and our proactive coordination with  these agencies facilitates a successful and timely permitting process. Our extensive experience designing  and permitting Florida coastal projects will allow us to assist the City in planning and implementing  successful marine and coastal projects.  EXHIBIT 4:   APTIM has served many Florida coastal clients.   City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  23  01C032018D    In-House Multidisciplinary Approach Our firm was specifically created, and continues to  operate today, with a focus on utilizing our  multidisciplinary in‐house capabilities (Exhibit 5) to  address the diverse and unique needs of Florida’s  coastal communities. APTIM offers an integrated  approach with a full team of experts in the following  disciplines:   Coastal/Marine Engineering   Biology   Coastal Geology   Survey   Geographic Information Systems (GIS)/CAD   Our team of professional engineers, biologists,  numerical modelers, geologists, surveyors, remote  sensing and mapping scientists and GIS specialists  handle all phases of marine and coastal projects from  reconnaissance through feasibility and design level studies to construction management and post‐ construction monitoring. This foundation of engaging multiple scientific disciplines has delivered  exceptional value to our clients throughout the entire process of project implementation. Our  professionals have extensive experience with all aspects of marine and coastal engineering including  beach nourishment, navigation projects, coastal structures (breakwater fields, groins, inlet jetties),  marinas and boat facilities, numerical modeling of coastal processes, marine geophysical and  geotechnical investigations, hydrographic surveys, NEPA compliance and permitting, and environmental  monitoring.   Marine and Coastal Engineering Services Summary The following presents a summary of the expertise APTIM will utilize on this RFQ to provide the City with  specialty services in beach/marine/intracoastal waterway engineering services; environmental  engineering; local, state and federal permitting; geotechnical services; land surveying services; marine  structural engineering services; environmental monitoring; and coastal and hydrographic surveying  services.  Coastal Engineering The combined experience of APTIM’s engineers is unmatched in the field of coastal engineering. Since  1984, we have designed and implemented more coastal and marine projects than any other engineering  firm in the United States, including more than 25 beach and dune restoration projects in just the last 10  years, and over 90 in our 30+ year history. Our success in providing the best beach restoration projects  for our clients, is guided by the application of proven methodologies combined with innovative design.  Our engineers are responsible for the study, planning and design of beach and bayside projects that  include shoreline stabilization, habitat restoration, artificial reef construction, inlet/canal management  and coastal structures. Our success in providing engineering solutions is driven by application of proven  methodologies combined with innovative design. Our engineers work closely with our biologists to  provide timely, cost‐effective solutions that meet our client’s project goals while protecting the natural  resources of the coastal ecosystem.   Exhibit 5:  APTIM’s integrated multidisciplinary approach.    City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  24  01C032018D    Coastal Modeling APTIM is on the forefront of coastal engineering numerical modeling. We have state‐of‐the‐art models,  such as Delft3D, GENESIS, REFDIF, SWAN, CCCLA, SBEACH and others, and the expertise to run them. We  often use the Delft3D model for coastal evaluations as it is considered the most complete model  available. Our modeling studies are developed by our coastal engineers who are strongly grounded in  coastal process theory and applications. We review our model results in the context of overall project  objectives and cost reduction and incorporate them into designs and analyses as a tool to improve  performance and longevity of projects. The behavior of beaches, inlets, and intracoastal shorelines can be  complex and dynamic. In order to overcome these complexities and test a wide range of solutions, APTIM  bases each project design on proven engineering principles with the added benefit of state‐of‐the‐art  numerical models.   Biology Our biologists are highly regarded within the scientific  community for their expertise and commitment to  habitat conservation. APTIM values the collaboration of  biologists and engineers starting at project inception,  which allows the project team to identify natural  resources in the area and work towards designing and  permitting a project that avoids environmental  impacts.  Our biologists do a thorough review of available natural  resource data when a project begins, typically followed  by an on‐site field investigation to assess the current  environmental conditions. As part of the planning and  permitting process, APTIM biologists often survey and  delineate hardbottom, artificial reef and seagrass  habitats. Our biologists undergo training in industry‐ established data collection and monitoring  methodologies in order to accurately identify and  classify biota and habitat types. Our biologists are  trained in the application of the Unified Mitigation  Assessment Method (UMAM) that they routinely use to  determine appropriate mitigation when projects result in unavoidable impacts.  APTIM biologists routinely design and implement biological monitoring programs to detect potential  project‐related impacts to natural resources and to monitor the success of mitigative artificial reefs. Our  firm is certified as an American Academy of Underwater Sciences (AAUS) organization, committed to  always implementing the highest level of safe‐diving practices.  Following program design and implementation, our biologists conduct statistical analyses on the data  collected in order to report results in a clear and concise manner to our clients and regulatory agencies.  All monitoring and reporting are conducted in coordination with agency staff and in compliance of state  and federal permit requirements.  APTIM biologists routinely conduct benthic surveys  throughout Florida.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  25  01C032018D    Permitting Our team begins each project with early coordination between clients and agencies to provide baseline  data and environmental documents (including NEPA documents) to facilitate and often expedite the  permitting process. Our biologists, engineers and geologists work together to guide our clients through  the permitting process based on a thorough understanding of current regulations and environmental  resource concerns. APTIM routinely prepares joint‐coastal permit (JCP), environmental resource permit  (ERP) and U.S. Army Corps of Engineers dredge and fill permit applications, coordinating with state and  federal agencies to obtain authorizations for a range of marine and coastal projects throughout Florida.  We have also acquired permits with the Florida Water Management Districts. Our in‐house staff of  professionals have the technical expertise to provide comprehensive and accurate information to the  regulatory agencies in a timely fashion and are highly experienced with the issues of primary concern to  regulators evaluating marine and coastal projects.   Funding Assistance As a routine component of our business, APTIM works with various funding sources as applicable to a  particular project. This allows local governments to leverage other grants and cost sharing. APTIM staff  have the ability, knowledge and professional relationships to provide additional assistance to the City in  coordinating with governmental or other agencies, and with the public. An important step to gaining  consensus and support for a project is education of the long‐term trends, processes and benefits.   Our engineers and biologists often participate in local stakeholder meetings to discuss proposed projects  for clients.  Coastal Geology Our geology department leads the industry in  identifying beach compatible sand sources. We have  located sand sources in Florida, Alabama, New York,  Louisiana, Georgia, Virginia, North Carolina, and  Massachusetts, as well as in sand starved areas of the  upper Texas coast. Our geophysicists and geologists  are experts in the use of remote sensing techniques,  marine geophysical data collection, processing and  interpretation, combining geomorphological mapping  with geotechnical measurements to locate and define  sand deposits accurately and effectively. Our  techniques are proven and efficient as we are able to  modify field operations on the fly as data is collected  and immediately analyzed.  Our success in identifying beach compatible material is rooted in the systematic approach to marine sand  searches developed over the years by our team of professionals. In a comprehensive marine sediment  search, we organize the investigation into three sequential phases that the FDEP has adopted as a  standard. This phased approach can be modified to meet the scope of the investigation and account for  the level of work previously performed. Regardless of the phases executed during a sediment search, our  investigation sequencing is preserved in order to maintain efficiency to provide confident results. Our  regional sand search approach is so successful that it has also been incorporated into Louisiana's Office of  Coastal Protection and Restoration (OCPR) "General Guidelines: Exploration for Offshore Sand Sources."    Vibracore logging in the field.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  26  01C032018D    Survey Our highly trained and licensed team of surveyors performs topographic and hydrographic surveys using  the latest technology and techniques. The incorporation of cutting edge technologies, such as Real Time  Kinematic Global Positioning Systems (RTK GPS) and Dynamic Motion Sensors, provides for the highest  level of confidence in all aspects of the data collection. RTK GPS is capable of collecting centimeter scale  elevations onshore and highly accurate positions and tidal data at sea. The further integration of motion  sensors on the survey vessel delivers highly precise data, which meets or exceeds USACE and  International Hydrographic Organization (IHO) accuracy standards. Our high quality offshore data is easily  merged with topographic data, which is critical for beach profile measurement. Our survey team can  produce seamless beach profiles. The tools and techniques we have developed provide our clients with  the most accurate morphological data leading to the best coastal management decisions.   We also use multibeam sonars and 3D scanning sonars when a complete depiction of the seafloor is  needed to support a project. APTIM has collected thousands of miles of multibeam data throughout the  southeastern United States. Our surveyors utilize several GPS systems and Inertial Measurement Units to  collect the most accurate data possible. The powerful computer systems onboard the survey vessels  allow for real time monitoring of the survey data to ensure one hundred percent coverage and data  integrity. 3D Sonars are also uniquely suited for underwater infrastructure inspection and imaging  without the cost of divers and without having to put a person in harm’s way.   GIS/CAD Our GIS/CAD department provides state‐of‐the‐art engineering drawings and mapping services in  compliance with local, state and federal resource protection and management agency directives. Our  team is experienced with the suite of ESRI’s Geographic Information Systems (GIS) products and  supporting software applications including Oracle, MS SQL, Javascript API, Visual Studio, Silverlight, FLEX,  SDE, .NET, Access and Microsoft sync technology for wireless field synchronization.  Our GIS professionals are responsible for providing a wide range of information management services and  product support. This service includes GIS design and deployment, website development, database  design, mobile data collection support, document and record management, as well as custom workflow  analysis and design. Our experienced professionals possess a broad range of experience with geospatial  and information management technologies and a multitude of standard application development  languages and tools. Our GIS and Mapping professionals regularly coordinate with our clients, agencies  and other stakeholders to ensure seamless data integration for upload/populating into existing  databases. Our engineers are hands‐on AutoCAD users and utilize the software throughout the design  process. This streamlines engineering plans and document preparation, as these engineering design CAD  files are submitted directly to our CAD professionals for final document development and QA/QC review.  Environmental Engineering APTIM and its legacy companies have been providing contamination assessment and remediation services  to the Miami‐Dade County area since the 1980s. As a nationwide leader in the environmental services  industry, APTIM has used technologies innovatively to benefit our customers. The diversity of projects  executed by APTIM for state and local clients is extensive. Our depth of technical resources allows us to  handle any request. Regardless of complexity, size, schedule, site limitations, contaminant characteristics,  regulatory limitations, or unique requirements. Our environmental engineering department is dedicated  to meeting the needs of the state and local agencies, and stands ready to provide expertise in a wide  array of technical services. We have addressed legacy contamination issues and performed site  assessments, immediate responses, and hazardous material removal. Our staff has provided subject  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  27  01C032018D    matter expertise on permit compliance and NEPA reviews and trained state and local personnel to  enhance their current knowledge on environmental and safety regulations.  APTIM’s approach is to be more than a contractor to the City of Sunny Isles Beach; we raise the level of  service to that of proactive consultant. Our organization, management philosophy, experience, and drive  to excellence offers the City unmatched benefit. Our experienced team can hit the ground running with  no learning curve and deliver results you can count on. Our local Operations Manager brings over 26  years of direct Miami‐Dade and State of Florida government experience. The APTIM environmental  engineering project management team also brings more than 50 years of combined state and local  support experience.  APTIM’s depth of local resources and environmental engineering expertise brings the ability to respond to  planned and unplanned needs; the ability to take on multiple assignments concurrently; the ability to find  efficient solutions, and the ability to keep costs to a minimum. We bring a dedicated team of local  professional including licensed engineers, geologists, asbestos consultants, certified hazardous materials  managers, pollutant storage system contractors, and general contractors. Our team performs local design  plan review and document production to expedite deliverables. APTIM is unique in the industry as we  have in‐house sampling and analytical equipment, heavy equipment, groundwater treatment systems,  and storage facilities. As discussed above in Section D, APTIM’s field‐proven project management, health  and safety programs, and QA/QC procedures reduce the City’s risk, management load, and raises your  overall confidence level.  APTIM brings direct, local project experience to the City including the following:   Phase I Environmental Assessments   Phase II Contamination Assessments   Asbestos, mold, and lead‐based paint surveys and abatement   Storage tank closures and removals   Contamination source removals   Remedial action plans, active remediation, and natural attenuation monitoring   Utility and drainage installation in contaminated areas   Design, installation, and operation of dewatering and groundwater treatment systems   Dewatering effluent discharge and well abandonment permitting   Emergency response to spill incidents and immediate response during roadway construction   Transportation and disposal (T&D) of hazardous and non‐hazardous waste   Risk management services and risk‐based site closures   A variety of contamination‐related, PD&E, and NEPA consulting services    City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  28  01C032018D    Office Locations The majority of our project team is located in our  Boca Raton, Florida office and will be the managing  office for this contract. Engineering, environmental,  geotechnical, modeling, CAD/GIS, administrative, and  some survey services are performed out of our office  in Boca Raton, and we also have a regional office in  St. Petersburg, Florida, from where we can mobilize  geotechnical related fieldwork. We also have  engineering staff in Jacksonville, Florida to facilitate  coordination with the U.S. Army Corps of Engineers  (USACAE) when needed. Exhibit 6 shows all of  APTIM’s Florida office locations.  With a fully specialized team of professionals, we are  able to provide not only quality personnel, but also  the necessary quantity of personnel within the  required disciplines to effectively execute multiple,  concurrent tasks. The team is available on a full‐time  basis to respond rapidly to the City’s needs. APTIM is  available for conference call meetings and  attendance of local meetings upon the City’s request.  Staff Availability APTIM employs a full staff of qualified marine and coastal professionals and scientists, including  engineers, geophysicists, geologists, biologists, certified hydrographers, and computer‐aided design (CAD)  and GIS specialists. The proposed personnel on this team have ample time to dedicate to the City. These  professionals will work together design and implement marine and coastal engineering projects that  meets the City’s needs.   When we pursue a new project similar to the ones proposed by the City, we evaluate whether we are  adequately staffed to fulfill the project’s scope. This evaluation is based on workload forecasts and  employee utilization rates. Since APTIM is a large company, we are accustom to providing quarterly  forecasts of workload. Monthly workloads are forecast a year in advance and help us to project future  workload and develop accurate project schedules. Weekly, monthly, and year to date employee  utilization rates are automatically distributed through our timesheet system. This lets us evaluate staffing  levels within different sections of the firm and allocate resources as needed.  Staff Resources The APTIM team can provide all of the marine and coastal engineering services you will need under this  contract. We are uniquely positioned to provide marine and coastal engineering services to the City of  Sunny Isles Beach due to our in‐house multidisciplinary capabilities, experience, and local knowledge. We  have also assembled a team of local subcontractors with the experience and expertise to provide a  comprehensive suite of services under each of the specified disciplines of this RFQ.  APTIM is extremely proud of the accomplishments of this staff in serving their clients. For over three  decades, our firm has permitted, mapped, designed, monitored, and managed construction for coastal  and marine projects. Such accomplishments include:    EXHIBIT 6:  APTIM offices are strategically located to facilitate efficient  response to client needs.      City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  29  01C032018D     13 Inlet Management Plans   41 beach restoration monitoring studies   20 inlet and inland waterway design/  management projects   90 major beach restoration project designs   11 Federal Design Memorandums (USACE)   30 numerical studies of coastal processes   64 borrow area studies locating hundreds of  millions cubic yards of sand   Over 2,500 beach profile surveys  Nothing makes us more proud than to see our  clients presented awards for the projects in which we were involved. Several of our clients’ beaches have  received accolades from reputable institutions within the coastal restoration and engineering industry  including ASCE, FSBPA, and ASBPA. Our clients have received recognition for having top‐restored or best‐ restored beaches by the American Shore and Beach Preservation Association. Each of these awards  signifies excellence in beach restoration for providing storm protection, habitat (environmental)  restoration, and preserving recreational value. Awards  include:   Manatee County ASBPA Robert L. Wiegel Coastal  Project Award 2015   Delray Beach ASBPA Top Restored Beach 2013   City of Sarasota, Lido Key, Top Restored Beach  2009   City of Boca Raton ASBPA Top Restored Beach  2008   Collier County ASBPA Top Restored Beach 2007   Captiva Island ASBPA Top Restored Beach 2006   Delray Beach ASBPA Coastal Project Award 2005   Panama City Beach ASBPA Top Restored Beach   2002  Key Personnel We have assembled the following core team members to fulfill the marine and coastal engineering needs  of the City. Our proposed team (Exhibit 7) offers its experience and proven multidisciplinary approach.  Brief bios of proposed key personnel are provided below. Full resumes providing technical and historical  summaries detailing the unique experience that our APTIM team offers are provided in Section E of the  SF330.   Manatee County’s Anna Maria Island Beach  Nourishment Project won ASBPA’s Robert L. Wiegel  Coastal Project Award in 2015.    APTIM nominated and presented the FSBPA Local  Government Award to Gary McAlpin, Coastal Zone  Manager of Collier County in September 2016.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  30  01C032018D      Thomas Pierro, PE, D.CE Director of Operations Thomas Pierro, PE, D.CE., is a registered Florida professional engineer with over  16 years of coastal engineering experience and is very familiar with Florida  coastal, hydrological, and regulatory environments. Mr. Pierro will serve as  Director of Operations for this RFQ and will provide senior project management,  technical oversight, and QA/QC. As a Director of the Coastal Restoration team,  he has authority to allocate staff as needed to address the dynamic needs of  coastal engineering projects. He is also the Engineer of Record for several beach nourishment programs  and brings a pragmatic approach to solving to complex problems. He is a Board Certified Professional by  the American Society of Civil Engineers as an ACOPNE Diplomate of Coastal Engineering and received the  Jim Purpura/T.Y. Chiu Engineering Award from FSBPA in 2011 for his outstanding contributions to coastal  engineering in the State of Florida. Mr. Pierro has extensive coastal engineering experience for clients in  Southeast and Southwest Florida.  EXHIBIT 7: APTIM Organization Chart     City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  31  01C032018D    Jordon Cheifet, PE, CFM Project Manager Jordon Cheifet, PE, CFM has been selected as Project Manager for the City’s  engineering tasks. He is a marine/coastal engineer with more than 12 years of  technical and project management experience, including beach programs,  waterfront structure design, FEMA coastal floodplain mapping, shoreline  restoration/protection design, numerical modeling, and marina design. Mr.  Cheifet is a registered professional engineer in the State of Florida and a Certified  Floodplain Manager. He gained significant experience working in the City of Sunny  Isles Beach with his former firm. Mr. Cheifet was the engineer of record of the Phase II – Coastal  Structures Feasibility Study prepared for the City in 2015. The report updated the original Phase I Study’s  recommendations, prepared for the City in 2009, based on recently completed or planned beach  management projects in South Florida, the feasibility of coastal structures, a beach performance  evaluation, the current environmental regulatory climate, and available funding strategy mechanisms. Mr.  Cheifet also evaluated the use and feasibility of innovative technologies for beach management in the  City.  In addition to his work on the Phase II Study, Mr. Cheifet performed an underwater assessment of the  two submerged breakwaters located at the north end of the City. The structures were built in 2001 to  mitigate end losses associated with a large fill project at that time. The underwater assessment found the  structures to have reduced height and cross‐section resulting from storm impacts and settlement.  Recommendations for repair were provided in an Underwater Investigation Report to the City.  Mr. Cheifet also worked with private developers at his former firm to support condominium development  in the City. This work included securing Coastal Construction Control Line permits, performing 100‐year  storm erosion analyses, wave load analyses, hydraulic flow analyses, and FEMA Letters of Map Change.    Beau Suthard, PG Marine Geophysicist Mr. Suthard has been with APTIM since 2005 conducting coastal and marine  geophysical, geotechnical and hydrographic surveys. He has conducted multiple full  geologic mapping studies required for engineering projects (including both field  operations and office‐based data processing, analysis, and interpretation), geologic  stratigraphic evaluations, sediment search investigations and cultural resource  investigations including sidescan sonar, seismic‐reflection, fathometer, and  magnetometer surveys. He has conducted vibracore collection and analysis in support of large‐scale  mapping and hydrographic projects of multiple coastal and estuarine systems throughout the southern  and eastern United States and Brazil.    Douglas Mann, PE, D.CE Senior Coastal Engineer Douglas Mann, PE, will provide coastal engineering services to the City. His  expertise in permitting and managing coastal armoring structures will assist the  City in addressing your coastal structural challenges. Mr. Mann has permitted  over 75 Coastal Construction Control Line (CCCL) permits for clients ranging  from coastal armoring structures, to public dune overwalks, and dune  restorations.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  32  01C032018D      Joao Dobrochinksi, MS Numerical Modeler Joao Dobrochinski is a numerical modeler and has experience in planning,  measuring, processing and interpreting environmental data, implementing/  calibrating numerical models, and estimating design parameters for dimensioning  coastal and port structures. Mr. Dobrochinski has been the principal investigator in  several numerical modeling projects related to wave propagation, hydrodynamics,  sediment transport and morphology changes in different locations along the  Atlantic and Gulf Coasts of the United States. In those projects, beach and inlet issues were investigated  based on measured data and state‐of‐the‐art numerical models.    Stacy Buck, MS Lead Biologist Stacy Buck has been a marine biologist with APTIM since 2006. She manages state  and federal permitting for our clients and coordinates regularly with Federal  agencies (NMFS and USFWS) to assist in consultations for listed species and  critical habitat. She prepares and implements hardbottom, artificial reef and  seagrass biological monitoring, habitat mitigation, and coral relocation plans for  coastal construction projects and manages the APTIM scientific diving program,  which is registered with the Academy of Underwater Sciences (AAUS).    Neil Campbell Operation Manager Neil Campbell will provide environmental engineering services to the City. His  experience in Miami‐Dade County, as well as 26 years in the local environmental  engineering consulting and construction field, will assist the City in due diligence,  geologic studies, solid waste consulting, groundwater studies, health and safety  studies, soil and groundwater assessments, and remedial design. Mr. Campbell’s  environmental remediation background includes successfully managing contracts for  the FDOT District 6 and Miami‐Dade DERM, and completing over 40 CARs and SARs and over 30 RAPs  utilizing a multitude of remediation technologies at various facilities.    Jeffrey L. Andrews, PSM, CIH Hydrographic Surveyor Jeffrey Andrews is Director of Operations for APTIM’s Marine Geosciences group.  Mr. Andrews has over 35 years of experience in hydrographic surveying in  offshore and navigable channel environments using the latest state‐of‐the‐art  equipment. He has conducted hundreds of marine investigations and mapped  more than 100 million cubic yards of beach compatible sand on the continental  shelf.    City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  33  01C032018D    Angela Belden Director of GIS/CAD Ms. Belden has more than 30 years of experience working with various GIS, CAD,  surveying and engineering programs. She is responsible for the management of  personnel, hardware, software, and resources that provide GIS services, 3D laser  scanning, small unmanned aircraft systems (sUAS/drone), and BIM/3D modeling to  all of our divisions and clients. She advises the groups Remote Sensing and Spectral  Analysis Applications, including geoprocessing, archival in spatial databases and the  creation of maps and visualizations. Ms. Belden is primary architect of our secure web‐based GIS intranet  service that allows our employees to readily access project data via the web.  Sub-consultant Team The following presents a summary of the sub‐consultants the team will utilize on this RFQ to provide the  City with specialty services in geotechnical services, architectural services, structural engineering, and civil  engineer services for coastal engineering.  HP Consultants, Inc. Geotechnical Services HP Consultants, Inc. has been serving public and private sector clients since  2002. They have provided a full range of geotechnical services to local  municipalities including the City of Miami Beach, Miami Gardens, FDOT,  Miami‐Dade County, and the Village of Palmetto Bay.  HP Consultants, Inc. is a  certified micro and woman owned business.     Currie Sowards Aguila Architects, Inc. Architectural Services Currie Sowards Aguila Architects, Inc. brings years of municipal architecture  experience to the project team. They have previously worked for municipalities  throughout Miami‐Dade, Broward, and Palm Beach Counties to design municipal  projects including waterfront parks, fire stations, and municipal buildings. Their  direct experience in South Florida allows the design projects that fit seamlessly  with the local environment.    Bryntesen Structural Engineers, Inc. Structural Engineering Bryntesen Structural Engineers, Inc. has served public and private  sectors with innovative and proven structural design solutions since  1986. They attribute success to their commitment to provide the highest quality professional services,  and the team approach is the firm’s cornerstone. They strive to secure the best talent and encourage  close collaboration with the project team members to meet the project needs and achieve the best  possible results for their clients.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  34  01C032018D    Leiter, Perez & Associates, Inc. Civil Engineering Services for Coastal Engineering Leiter Perez & Associates, Inc. is a well established firm comprised of  professionals with expertise in the areas of civil/environmental engineering  and land surveying. They have been in business in South Florida for over 43  years helping their clients by providing a knowledgeable staff, using state‐ of‐the‐art technology, and establishing a teamwork approach to a large  array of engineering and land surveying projects. They provide a superior  product while meeting the challenging schedule that is often required. Their clients include government  agencies, residential and commercial developers, contractors, engineering firms, and property owners.  Engineering projects include water, sanitary sewer, paving, grading, and drainage design. They have an  excellent reputation with local government agencies which aids in the expediting of the permitting  process. They are certified as a Micro/Small Business Enterprise (MICRO/SBE), Florida Certificate No.  10557 and Community Business Enterprise (CBE), Florida Certificate No. 1443, in Miami‐Dade County,  Florida.  MIAMI-DADE COUNTY - STATE OF FLORIDA LOCAL BUSINESS TAX BUSINESS LOCATION: OWNER/CORP. PHONE # BUS. COMMENCEMENT DATE: SEC TOTAL AMOUNT DUE: RECEIPT: STATE # AMOUNTFEE If no longer in business, please notify us in writing. Review and correct the information shown on this application. A 25% penalty will be assessed to anyone found operating without a paid local business tax, in addition to any other penalty provided by law or ordinance (Sec 8A-176(2)). A Certificate of Use and/or City Business Tax Receipt may also be required. To pay online go to www.miamidade.gov/taxcollector To pay by mail, make check payable to: Miami-Dade County Tax Collector Business Tax 200 NW 2nd Avenue Miami FL 33128 To pay in person go to: 200 NW 2nd Avenue (305) 270-4949, fax (305) 372-6368 MIAMI-DADE COUNTY - STATE OF FLORIDA LOCAL BUSINESS TAX BUSINESS LOCATION: OWNER/CORP. BUS. COMMENCEMENT DATE: SEC TYPE OF BUSINESS SIGNATURE REQUIRED SEE INSTRUCTIONS ABOVE APPLICATION IS HEREBY MADE FOR A LOCAL BUSINESS TAX RECEIPT OR PERMIT FOR THE BUSINESS PROFESSION OR OCCUPATION DESCRIBED HEREON. I HAVE BEEN INFORMED OF ALL ZONING RESTRICTIONS IMPOSED ON THIS RECEIPT. I SWEAR THAT THE INFORMATION IS TRUE AND CORRECT. RECEIPT: STATE # DETACH HERE AND RETURN THIS PORTION WITH YOUR PAYMENT RETAIN FOR YOUR RECORDS APPLICATION DETAILS TYPE OF BUSINESS DBA/BUSINESS NAME: NAICS CODE: A service fee of not less than $25.00 up to a minimum of 5% will be charged for all returned checks. 5058235 5058235 Please Pay 0.00 Receipt Fee CON CON Multi-Municipal Contractor Fee Doing Business without a License Penalty - $0.00 Transfer Fee Bingo Permit Fee APTIM ENVIRONMENTAL & INFRASTRUCTURE INC C/O MICHAEL DILLMAN 5725 NW 159 ST MIAMI LAKES, FL 33014 0.00 Late Penalty 0.00 - - 4846342 4846342 40.00 March 05, 2018 March 05, 2018 APPLICATION APPLICATION 0.00 *7+5058235+2018* 20.00 APTIM ENVIRONMENTAL & INFRASTRUCTURE INC 0.00 0.00 0.00 RENEWAL RENEWAL 0.00 $0.00 Library Fee 0.00 0.00 CONSULTANT CONSULTANT Nightclub Permit Fee N/A N/A 06/01/2002 06/01/2002 Collection Cost UMSA Fee $0.00 5725 NW 159TH ST MIAMI LAKES, FL 33014 5725 NW 159TH ST MIAMI LAKES, FL 33014 0.00 APTIM ENVIRONMENTAL & INFRASTRUCTURE INC C/O MICHAEL DILLMAN APTIM ENVIRONMENTAL & INFRASTRUCTURE INC C/O MICHAEL DILLMAN 2017 2017 0.00 Restricted Contractor Fee 0.00 Prior Years Due Amount Recently Paid NSF Fee 5416 2018 2018 5725 NW 159 ST MIAMI LAKES, FL 33014 If Received By 60.00 $0.00 Mar 31, 2018 Please pay only one amount. The amounts due after Sept 30th include penalties per FS 205.053. Beacon Council Fee Apr 30, 2018 7000000000000000000000005058235201800000006000000000000002 May 31, 2018 Jun 30, 2018 I RICK SCOTI, GOVERNOR KEN LAWSON, SECRETARY STATE OF FLORIDA ,-DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL GEOLOGISTS ~'dMfWI§Hi;, PG2615 The PROFESSIONAL GEOLOGIST Named below IS LICENSED Under the provisions of C_hapter 492 FS ~ Expiration date: JUL 31, 2018 ,. / SUTHARD , BEAU CHRISTIAN 807 MARCO DRIVE NE ST. PETERSB_URG FL 33702 ISSUED: 05/17/2016 DISPLAY AS REQUIRED BY LAW SEQ# L 1605170001650 / RICK s co n . GOVERN OR KEN LAWSO N, SECRETARY STATE OF FLORIDA DEPARTMENT OF B U S I N ES S AND PROFESSIONAL REGULATION B O A RD OF PROFESSION AL GEO LOG ISTS PG:7718 The PROF ESSI O N AL G -oi OGIST Named b elow IS LI CENSED Under th e prov1 ion of Chapt ~r 4 92 F'S Ex piratio n da te J U I 31 2018 M CCOY, K l I S 1 IN A l fl l N 16893 84 I 11 GOU 1 NO! T H LOXAHAl C H E FL 33470 OISPlA S REQUIRED BY LA rv 0 L160 210001746 BRYNTESEN STRUCTURAL ENGINEERS CURRIE SOWARDS AGUILA ARCHITECTS HP CONSULTANTS, INC. miamidade.gov Internal Services Department Small Business Development 111 NW 1 Street, 19th Floor Miami, Florida 33128 miamidade.gov T 305-375-3111 F 305-375-3160 February 20, 2018 Arvind S. Kumbhojkar HP CONSULTANTS INC. 10220 SW 107th St Miami, FL 33176 Approval Date: January 31, 2018 - Small Business Enterprise - Architectural & Engineering (SBE - A&E) Expiration Date: January 31, 2021 Dear Arvind S. Kumbhojkar, Miami-Dade County Small Business Development (SBD), a division of the Internal Services Department (ISD) has completed the review of your application and attachments submitted for certification. Your firm is officially certified as a Miami-Dade County Small Business Enterprise - Architectural & Engineering (SBE - A&E). The Small Business Enterprise (SBE) programs are governed by sections 2-8.1.1.1.1; 2-8.1.1.1.2; 2-10.4.01; 10-33.02 of Miami-Dade County’s Codes. This Small Business Enterprise - Architectural & Engineering (SBE - A&E) certification is valid for three years provided that you submit a "Continuing Eligibility Affidavit" on or before your anniversary date, January 31, 2019. The affidavit must indicate any changes or no changes in your firm pertinent to your certification eligibility. The submittal of a "Continuing Eligibility Affidavit" annually with specific supporting documents on or before your Anniversary Date is required to maintain the three-year certification. You will be notified of this responsibility in advance of the Anniversary Date. Failure to comply with the said responsibilities may result in immediate action to decertify the firm. If at any time there is a material change in the firm including, but not limited to, ownership, officers, director, scope of work being performed, daily operations, affiliation(s) with other businesses or the physical location of the firm, you must notify this office in writing within (30) days. Notification should include supporting documentation. You will receive timely instructions from this office as to how you should proceed, if necessary. This letter will be the only approval notification issued for the duration of your firm’s three years’ certification. If the firm attains graduation or becomes ineligible during the three-year certification period, you will be properly notified following an administrative process that your firm’s certification has been removed pursuant to the code. Your firm’s name and tier level will be listed in the directory for all SBE certified firms, which can be accessed through Miami-Dade County’s SBD website: http://www.miamidade.gov/smallbusiness/certification-lists.asp. The categories as listed below affords you the opportunity to bid and participate on contracts with Small Business Enterprise measures. It is strongly recommended that you register your firm as a vendor with Miami-Dade County. To register, you may visit: http://www.miamidade.gov/procurement/vendor-registration.asp. Thank you for your interest in doing business with Miami-Dade County. If you have any questions or concerns, you may contact our office at 305-375-3111 or via email at sbdcert@miamidade.gov. Sincerely, Claudious Thompson, Section Chief Small Business Development CATEGORIES: (Your firm may bid or participate on contracts only under these categories) MDC-TCC 01-01: URBAN AREA AND REGIONAL TRANSPORTATION PLANNING MDC-TCC 03-01: SITE DEVELOPMENT AND PARKING LOT DESIGN MDC-TCC 03-04: TRAFFIC ENGINEERING STUDIES MDC-TCC 03-05: TRAFFIC COUNTS MDC-TCC 03-06: TRAFFIC CALMING MDC-TCC 03-07: TRAFFIC SIGNAL TIMING MDC-TCC 03-08: INTELLIGENT TRANSPORTATION SYSTEM ANALYSIS, DESIGN, AND IMPLEMENTATION MDC-TCC 03-09: SIGNING, PAVEMENT MARKING, AND CHANNELIZATION MDC-TCC 08: TELECOMMUNICATION SYSTEMS MDC-TCC 09-01: DRILLING, SUBSURFACE INVESTIGATIONS AND SEISMOGRAPHIC SERVICES MDC-TCC 09-02: GEOTECHNICAL AND MATERIALS ENGINEERING SERVICES MDC-TCC 16: GENERAL CIVIL ENGINEERING MDC-TCC 17: ENGINEERING CONSTRUCTION MANAGEMENT MDC-TCC 19-01: TRANSPORTATION PLANNING MDC-TCC 19-03: HIGHWAY SYSTEMS MDC-TCC 19-09: SOILS, FOUNDATIONS AND MATERIALS TESTING MDC-TCC 19-16: GENERAL CIVIL ENGINEERING NAICS 541330: ENGINEERING SERVICES miamidade.gov Internal Services Department Small Business Development 111 NW 1 Street, 19th Floor Miami, Florida 33128 miamidade.gov T 305-375-3111 F 305-375-3160 February 20, 2018 Arvind S. Kumbhojkar HP CONSULTANTS INC. 10220 SW 107th St Miami, FL 33176 Approval Date: January 31, 2018 - Small Business Enterprise - Architectural & Engineering (SBE - A&E) Expiration Date: January 31, 2021 Dear Arvind S. Kumbhojkar, Miami-Dade County Small Business Development (SBD), a division of the Internal Services Department (ISD) has completed the review of your application and attachments submitted for certification. Your firm is officially certified as a Miami-Dade County Small Business Enterprise - Architectural & Engineering (SBE - A&E). The Small Business Enterprise (SBE) programs are governed by sections 2-8.1.1.1.1; 2-8.1.1.1.2; 2-10.4.01; 10-33.02 of Miami-Dade County’s Codes. This Small Business Enterprise - Architectural & Engineering (SBE - A&E) certification is valid for three years provided that you submit a "Continuing Eligibility Affidavit" on or before your anniversary date, January 31, 2019. The affidavit must indicate any changes or no changes in your firm pertinent to your certification eligibility. The submittal of a "Continuing Eligibility Affidavit" annually with specific supporting documents on or before your Anniversary Date is required to maintain the three-year certification. You will be notified of this responsibility in advance of the Anniversary Date. Failure to comply with the said responsibilities may result in immediate action to decertify the firm. If at any time there is a material change in the firm including, but not limited to, ownership, officers, director, scope of work being performed, daily operations, affiliation(s) with other businesses or the physical location of the firm, you must notify this office in writing within (30) days. Notification should include supporting documentation. You will receive timely instructions from this office as to how you should proceed, if necessary. This letter will be the only approval notification issued for the duration of your firm’s three years’ certification. If the firm attains graduation or becomes ineligible during the three-year certification period, you will be properly notified following an administrative process that your firm’s certification has been removed pursuant to the code. Your firm’s name and tier level will be listed in the directory for all SBE certified firms, which can be accessed through Miami-Dade County’s SBD website: http://www.miamidade.gov/smallbusiness/certification-lists.asp. The categories as listed below affords you the opportunity to bid and participate on contracts with Small Business Enterprise measures. It is strongly recommended that you register your firm as a vendor with Miami-Dade County. To register, you may visit: http://www.miamidade.gov/procurement/vendor-registration.asp. Thank you for your interest in doing business with Miami-Dade County. If you have any questions or concerns, you may contact our office at 305-375-3111 or via email at sbdcert@miamidade.gov. Sincerely, Claudious Thompson, Section Chief Small Business Development CATEGORIES: (Your firm may bid or participate on contracts only under these categories) MDC-TCC 01-01: URBAN AREA AND REGIONAL TRANSPORTATION PLANNING MDC-TCC 03-01: SITE DEVELOPMENT AND PARKING LOT DESIGN MDC-TCC 03-04: TRAFFIC ENGINEERING STUDIES MDC-TCC 03-05: TRAFFIC COUNTS MDC-TCC 03-06: TRAFFIC CALMING MDC-TCC 03-07: TRAFFIC SIGNAL TIMING MDC-TCC 03-08: INTELLIGENT TRANSPORTATION SYSTEM ANALYSIS, DESIGN, AND IMPLEMENTATION MDC-TCC 03-09: SIGNING, PAVEMENT MARKING, AND CHANNELIZATION MDC-TCC 08: TELECOMMUNICATION SYSTEMS MDC-TCC 09-01: DRILLING, SUBSURFACE INVESTIGATIONS AND SEISMOGRAPHIC SERVICES MDC-TCC 09-02: GEOTECHNICAL AND MATERIALS ENGINEERING SERVICES MDC-TCC 16: GENERAL CIVIL ENGINEERING MDC-TCC 17: ENGINEERING CONSTRUCTION MANAGEMENT MDC-TCC 19-01: TRANSPORTATION PLANNING MDC-TCC 19-03: HIGHWAY SYSTEMS MDC-TCC 19-09: SOILS, FOUNDATIONS AND MATERIALS TESTING MDC-TCC 19-16: GENERAL CIVIL ENGINEERING NAICS 541330: ENGINEERING SERVICES LEITER, PEREZ & ASSOCIATES, INC. 01C032018D S F 3 3 0 P A R T I : A - I SF 330 PART I: A-I 01C032018D A-C: CONTACT INFORMATION City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  2  01C032018D    ARCHITECT – ENGINEER QUALIFICATIONS  Part I – Contract‐Specific Qualifications  A. CONTRACT INFORMATION  1. TITLE AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc.  2. PUBLIC NOTICE DATE  3. SOLICITATION OR PROJECT NUMBER  February 27, 2018  No. 18‐02‐01  B. ARCHITECT‐ENGINEER POINT OF CONTACT  4. NAME AND TITLE  5. NAME OF FIRM  Thomas Pierro, PD, D.CE, Director of Operations  Aptim Environmental & Infrastructure, Inc.  6. TELPHONE NUMBER  7. FAX NUMBER  8. E‐MAIL ADDRESS  (561) 391‐8102  (561) 391‐9116  Thomas.Pierro@aptim.com  C. PROPOSED TEAM  (Complete this section for the prime contractor and all key subcontractors.)   (Check)  9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT  PR I M E   J‐ V   PA R T N E R SU B C O N ‐   TR A C T O R a.     Aptim Environmental &  Infrastructure, Inc.  2481 NW Boca Raton Blvd.  Boca Raton, FL 33431  Coastal Management Consultant, Coastal  Engineering Services, Engineering, and  Permitting, Design and permitting of coastal  stabilization structures, modeling, planning,  feasibility studies, Marine biological studies,  CAD/ GIS, construction monitoring, contract  management and coordination, funding  applications.             CHECK IF BRANCH OFFICE  b.       Aptim Environmental &  Infrastructure, Inc.         CHECK IF BRANCH OFFICE  101 16th Ave, South, Suite 6  St. Petersburg, FL 33702  Coastal Management Consultant, Coastal  Engineering Services, Engineering, and  Permitting, Design and permitting of coastal  stabilization structures, modeling, planning,  feasibility studies, Marine biological studies,  CAD/ GIS, construction monitoring, contract  management and coordination, funding  applications.  b.       Aptim Environmental &  Infrastructure, Inc.  14350 Commerce Way  Miami Lakes, FL 33016  Environmental engineering, hazardous waste  remediation, environmental assessment,  remediation, noise management studies,  environmental impact statements, Phase One  environmental assessments.        CHECK IF BRANCH OFFICE  c.      Currie Sowards Aguila Architects  185 NE 4 th Avenue, Suite 101  Delray Beach, Florida 33483  Architectural services   CHECK IF BRANCH OFFICE  d.       Bryntesen Structural Engineers   CHECK IF BRANCH OFFICE  3045 N. Federal Highway  Building #80 Fort Lauderdale  Florida 33306  Structural Engineering  e.       HP Consultants, Inc.    CHECK IF BRANCH OFFICE  10220 SW 107 Street  Miami, Florida 33176  Geotechnical Engineering and testing services  f.       Leiter Perez & Associates, Inc.     520 NW 165th Street Road  Suite 209, Miami, Florida 33169  Civil Engineering    CHECK IF BRANCH OFFICE  01C032018D D: ORGANIZATION CHART City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  3  01C032018D    D. ORGANIZATIONAL CHART OF PROPOSED TEAM  (Attached)  01C032018D E: RESUMES OF KEY PERSONNEL City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  4  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Thomas P. Pierro, PE, D.CE  Director of Operations a. Total 17  b. With Current Firm 17  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  MS/Ocean Engineering/Florida Atlantic University/ Boca  Raton, Florida, 2001  BS/Ocean Engineering/Florida Atlantic University/ Boca  Raton, Florida, 1999  Professional Engineer, Civil, Florida, License No. 64683, Active  Professional Engineer, Civil, New York, License No. 090464‐1,  Active  ASCE, Diplomate, Coastal Engineering (ACOPNE), Nationwide,  Active  18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  ASCE, ASBPA, FSBPA, Surfrider Foundation, PADI certified SCUBA diver, NITROX certified, Jim Purpura/T.Y. Chiu Award  (FSBPA) for outstanding contribution to coastal engineering in the State of Florida.  Thomas Pierro is the Director of our Coastal Restoration group and a Senior Coastal Engineer with broad experience in  project management, planning, design and permitting, engineering and modeling, plans and specifications, field  investigation, construction oversight, and feasibility studies of coastal engineering projects. Since 2001, Mr. Pierro  served as Project Engineer on several shore protection, beach nourishment, and marine structure projects. In 2011, the  Florida Shore & Beach Preservation Association awarded Mr. Pierro the Jim Purpura/T.Y. Chiu Award for outstanding  contribution to coastal engineering.  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  City of Deerfield Beach Storm Berm Nourishment   Deerfield Beach, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2016‐present  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Pierro provided high level project management for coastal engineering permitting and design services for a  beach nourishment project along the shoreline damaged by Hurricane Matthew. Services provided include  geotechnical testing of native and fill sands, preliminary design, and submittal of an FDEP Coastal Construction  Control Line (CCCL) permit application, with recent permit issuance provided and provides the City with a proactive  mechanism to nourish their shoreline before and after a storm.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Manatee County Coastal Management Program   Manatee County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2007‐Present  2005/2006, 2011, 2014  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Pierro directed a comprehensive feasibility study for Manatee County in 2007 to evaluate the cost and need for  shore protection in areas outside the federal project area on Anna Maria Island. Based on the recommendations of  the report, the County constructed the Coquina Beach Nourishment Project and a 5‐acre artificial reef in 2011,  designed and permitted by Mr. Pierro. He also designed and managed the installation of geotextile tubes to sand  tighten the Longboat Pass Jetty to improve the performance of the beach nourishment project. He recently  completed a comprehensive modeling study of Longboat Pass resulting in an updated inlet management plan. He  also worked with the County to remove three derelict groins along Cortez Beach and replace them with permeable  adjustable groins. This project was designed using the Delft3D numerical model. Mr. Pierro assisted the USACE in  design and permitting of the 2014 nourishment project, and continues to play a key role in the management of the  County’s island‐wide shore protection program. Mr. Pierro also assisted the County in the design, permitting,  construction assistance of the 2014 Coquina Beach nourishment project.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  5  01C032018D    c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Lido Key Beach Nourishment Project and Hurricane and Storm Damage  Reduction Project  City of Sarasota, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2005‐present  2009, 2015  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Pierro served as Project Manager and Senior Engineer for the FEMA supported repair of the 2009 Lido Key  Beach Nourishment Project. He developed a 3D numerical model (Delft3D) study centered on the project area to  evaluate the effects of dredging the New Pass ebb shoal on the surrounding coastal system. The modeling also  required the deployment of APTIM’s in‐house ADCPs to collect wave and current data to provide field data for  model verification. The successful modeling analysis resulted in issuance of the project permits and construction  was completed in less than 40 days. In early 2015, Mr. Pierro also directed the Tropical Storm Debby Repair project,  constructed by the City of Sarasota with FEMA funding. He administered all aspects of the construction contract  resulting in an on‐time and on‐budget completion of the projects.  Mr. Pierro is currently managing the coastal engineering services that APTIM is providing to the City of Sarasota to  assist the USACE with the federally authorized Lido Key HSDR Project. He assisted with the review of the USACE Big  Sarasota Pass modeling study, attended the NEPA scoping meeting, manages the FDEP permitting, and participates  in regular USACE project team meetings.  d.  (1) TITLE AND LOCATION (City and State)   (2) YEAR COMPLETED  Captiva and Sanibel Islands Beach Nourishment Project   Lee County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2006‐present  2005/2006, 2008, 2013  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Pierro worked with the U.S. Army Corps of Engineers as representative of the Captiva Erosion Prevention District  (CEPD), who is the local sponsor, during construction of the Federal 2005‐06 Captiva and Sanibel Islands  Renourishment Project. He also acted as on‐site engineer and consultant for construction of beach and  rehabilitation of the terminal groin at Redfish Pass, a local component of the Federal project. Mr. Pierro assisted  with the 2014 nourishment project as Senior Project Manager and currently leads our APTIM team for the CEPD’s  projects and provides direct support to CEPD staff.  e.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Palm Beach Comprehensive Erosion Control Project   Palm Beach County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  April 2006 – Present  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  As Project Manager and Modeling Engineer, Mr. Pierro designed the project to hold a moderate beach with  structures based on results from two numerical models: the BOUSS2D breaking wave model and the Delft3D  morphologic (sand transport) model. The results suggested a recommended plan of sand nourishment and groins to  achieve the project objectives, which is in permitting.  f.  (1) TITLE AND LOCATION (City and State)   (2) YEAR COMPLETED  Indian River County Beach Management Program  Indian River County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2013‐ongoing  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Pierro has acted as the program manager for the County since 2013. In that time, Mr. Pierro has provided keen  oversight for the progress and success of the County’s beach management program. Mr. Pierro has led the APTIM  team to implement major beach management initiatives for the County, including being involved in the technical  aspects of updating the County’s Beach Preservation Plan and implementation the Sector 3 Dune Repair Project. He  is currently supporting the development of the planned Sector 5 Beach and Dune Renourishment Project.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  6  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Jordon Cheifet, PE, CFM  Project Manager a. Total 12  b. With Current Firm 2  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  MS/Ocean and Resources Engineering, University of Hawaii,  Honolulu, Hawaii, 2005  BS/Civil Engineering, Pennsylvania State University, University  Park, Pennsylvania, 2002  Professional Engineer, Civil, Florida, License No. 72876  Professional Engineer, Civil, Alabama, License No. 32033  Professional Engineer, Civil, Texas, License No. 109507  18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Certified Floodplain Manager; Certified Video Ray ROV Operator; Surface Supplied Air Underwater Inspection  Certification; OSHA Confined Space Entrant and Attend2016‐ongoing ant Program; OSHA HAZWOPER 40 Hr Training;  Advanced/Rescue/Nitrox SCUBA Certification  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Storm Berm Nourishment – City of Deerfield Beach, Florida  City of Deerfield Beach, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2016  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Cheifet provided coastal engineering permitting and design services for a beach nourishment project along the  shoreline damaged by Hurricane Matthew. Services provided include geotechnical testing of native and fill sands,  preliminary design, and submittal of an FDEP Coastal Construction Control Line permit application, with recent permit issuance to help the City with a proactive mechanism to nourish their shoreline before and after a storm.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Southern Palm Beach Island Comprehensive Shoreline Stabilization  Town of Palm Beach, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2016‐ongoing  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Cheifet provided coastal engineering support to respond to public comments associated with the USACE  Environmental Impact Statement review process. Technical responses were prepared based on a review of the basis  of design and technical documentation used to prepare the draft and final EIS documents.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Groin Rehabilitation, Town of Palm Beach, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2016  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Cheifet provided coastal engineering support to respond to public comments associated with the USACE  environmental permit review process. Technical responses were prepared based on a review of the basis of design  and technical documentation used to prepare the draft and final EIS documents. Mr. Cheifet prepared and  submitted Individual Project Authorization (IPA) application materials to the FDEP to secure permits under the  Beach Management Agreement (BMA).  d.  (1) TITLE AND LOCATION (City and State)   (2) YEAR COMPLETED  10th Street Outfall, City of Sarasota, Florida PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2015  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Cheifet provided structural design for the marine works of this municipal boat basin project, which include boat  basin dredging and bulkhead replacement. Services performed included bulkhead repair design, basis of design  reporting, and QA/QC of internal and sub‐consultant project deliverables including construction plans and technical  specifications.     City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  7  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Beau C. Suthard, PG  Marine Geophysicist a. Total 20  b. With Current Firm 13  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | St. Petersburg, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  MS/Geological Oceanography/University of South Florida,  2005  BS/Marine Science (Geology)/Eckerd College, 1997  Professional Geologist License/Florida, Virginia, Delaware  Professional Geologist, Louisiana, License No. 746  Professional Geologist, Florida, License No. PG2615  18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  BOEM Protected Species Observer Certification Course Instructor (Geophysical Component), PADI Open Water SCUBA  Diver  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Pinellas County Coastal Management Program   Pinellas County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2007‐Present  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Suthard has been the Program and Project Manager of APTIM’s coastal projects with the Pinellas County Coastal  Management Program since 2007. His duties include project and client management for all aspects of the County’s  coastal management programs, including project proposals, budgets, and project implementation with APTIM’s  multidisciplinary staff of engineers, geologists and biologists as needed. He has managed the design and  implementation of both a reconnaissance‐level sand search and a design‐level sand search to locate and permit  sand resources for the Sand Key Shore Protection Project. Mr. Suthard also managed and assisted with the  development of a comprehensive Summary Planning Document, which described every one of the County’s coastal  program elements in terms of their history, current status and potential future needs as well as Capital  Improvement budget predictions for each element through 2020.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Lido Key Beach Nourishment Projects, City of Sarasota, Florida PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2005‐present  2009  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Suthard served as Marine Geophysicist for a series of full geologic mapping studies for the 2009 Lido Key Beach  Nourishment Project. These investigations included full geologic stratigraphic evaluations, sand search investigations  and cultural resource investigations utilizing sidescan sonar, seismic sub‐bottom, fathometer, and magnetometer  surveys, together with vibracore collection and analysis. The high quality white sand for the project came from the  New Pass navigation channel and ebb shoal. The project won the ASBPA Best Restored Beach Award for 2009.  c.  (1) TITLE AND LOCATION (City and State)  SECTION F PROJECT #5 (2) YEAR COMPLETED  Anna Maria Island Shore Protection Program   Manatee County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2005‐present  2005/2006, 2011, 2014  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Suthard served as Marine Geophysicist for a series of full geologic mapping studies, including both field  operations and office‐based data processing and interpretation in order to identify and define offshore borrow  areas of beach‐compatible sand in support of the Anna Maria Island Central Beach Storm Damage Repair Project,  the City of Anna Maria and Coquina Beach Nourishment Projects and the Central Anna Maria Beach Renourishment  Project. Mr. Suthard also assisted with investigations to map and identify potential mitigative artificial reef  construction sites.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  8  01C032018D    d.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Town of Longboat Key Comprehensive Beach Management Program  Longboat Key, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2009‐present  2011  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Suthard has served as the Program and Project Manager of APTIM’s coastal projects with the Town’s  Comprehensive Beach Management Program since 2010. His responsibilities include managing project proposals,  budgets, and execution management with APTIM’s team of engineers, geologists and biologists. In his Program  Management role, Mr. Suthard has represented the Town at meetings with regulatory agencies and presented  project information to the Town Commission and at public workshops. He has specifically managed Phase I, II, and III  offshore sand searches for beach restoration projects. Mr. Suthard also assisted the Town with review, comment  and negotiation of impact solutions from a potential offshore infrastructure project (Port Dolphin) being developed  through Town identified beach compatible sand resources, resulting in an agreement allowing the Town time to  dredge these resources prior to the project’s implementation with cost sharing funds from the developer.  e.  (1) TITLE AND LOCATION (City and State)   (2) YEAR COMPLETED  Florida Department of Environmental Protection (FDEP) United States  Bureau of Ocean Energy Management (BOEM) Atlantic Sand  Assessment Project (ASAP) Reconnaissance Data Processing and  Interpretation  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2017  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Suthard processed and interpreted the geophysical and geotechnical data collected offshore Florida during the  2015 BOEM ASAP reconnaissance survey. APTIM was tasked with delineating preliminary borrow areas in all six  counties (eight study areas) that met a minimum cut thickness of 3 feet after applying a 2 ft buffer over  incompatible material. APTIM processed and interpreted all chirp sub‐bottom data to determine potential sand  thicknesses and output of interpreted thickness for each area. Sidescan sonar and magnetometer data were  processed to identify and avoid any potential hazards or protected resources.  Out of the eight study areas offshore six Florida counties, APTIM was able to delineate 16 preliminary borrow areas  consisting 54,477,396 cubic yard (cy) of potentially beach‐compatible sand resources. Each preliminary borrow area  was reviewed and classified as a “Potential” or “Unverified” sand resource in accordance with the Southeast Florida  Assessment and Needs Determination (SAND) study conducted by the USACE and FDEP.  f.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  United States Bureau of Ocean Energy Management (BOEM) Atlantic  Sand Assessment Project (ASAP)  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2015‐present  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Project Manager and Technical Manager. The goal of the project is to acquire geophysical and geological data along  the east coast of the United States from Florida to Maine to support identification, characterization, and delineation  of Outer Continental Shelf (OCS) aggregate mineral resources for use by coastal communities’ in future coastal  restoration efforts. This ongoing project consists of the collection of 6,400 km of high‐resolution geophysical data  and swath bathymetry together with 440 geologic samples over the course of three years.     City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  9  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Beth Forrest, PhD. PG  Project Geoscientist a. Total 15  b. With Current Firm 11  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND  DISCIPLINE)  PhD/Geology, Florida State University, Tallahassee, Florida, 2007  MS/Geology‐Geochronology, McMaster University, Hamilton, Ontario,  Canada, 2003  BS/Geology, McMaster University, Hamilton, Ontario, Canada, 2001  Professional Geologist, New York  18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  BOEM Certified Protected Species Observer  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Louisiana Sand Resource Database (LASARD), CPRA  Coastal Louisiana  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2013 ‐ Present  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  LASARD was developed for the Coastal Protection and Restoration Authority (CPRA) to help facilitate the  identification and management of nearshore, offshore and riverine sediment resources. In LASARD, the geoscientific  and related data acquired for ecosystem restoration are archived, populated, and maintained on a GIS platform.  Since 2013, Dr. Forrest has managed the project, overseeing database development, development of standards and  specifications, data compilation, data formatting, archiving and QA/QC.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Coastal Resiliency Plan, Texas General Land Office   Houston, Texas  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2013 ‐ 2016  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Dr. Forrest coordinated stakeholder involvement through a series of one‐on‐one meetings with City Managers, City  and County Engineers, and emergency management staff to discuss critical infrastructure needs and concerns.  Potential projects were then identified and resiliency and infrastructure assessments were conducted. The project  resulted in a project portfolio and report, containing prioritized projects according to risk. As data manager, Dr.  Forrest coordinated the development of an online web interface to disseminate the data compiled over the course  of the project. She was also heavily involved in data compilation and evaluation, quality control and development of  final deliverables. She also assisted the project manager with the development of risk assessment and ranking  methods.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Southwest Florida ROSSI Borrow Area Update, FDEP PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2016‐Present  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Project Manager for assessing sediment needs for southwest Florida including Pinellas, Manatee, Sarasota,  Charlotte, Lee and Collier Counties. Contingencies that increase needed volumes (i.e. borrow area waste, dredging  losses, future project performance) are incorporated into the needs determination. Compile existing offshore  sediment sources. Evaluate bathymetric, seismic and geotechnical data to identify offshore sand sources that meet  predetermined sediment characteristics for each county project. Sediment sources are assigned categories based on  data confidence and volumes for each source are calculated based on borrow area designs and bathymetric data  with GIS.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  10  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Kristina McCoy, PG  Project Geologist a. Total 15  b. With Current Firm 15  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND  DISCIPLINE)  MS/2007/Geology/Florida Atlantic University/Boca Raton/Florida  BS/2003/Geology/Florida Atlantic University/Boca Raton/Florida  Professional Geologist, Florida, License No. 2718  BOEM Protected Species Observer  BOEM Marine Debris Trained   18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Kristina McCoy has 15 years of experience in coastal geology on sediment renourishment projects along the Gulf and  East Coast states. She has assisted on over 40 sediment search and geotechnical investigation projects. Her current  work includes borrow area development and design, bathymetric and isopach surface development and evaluation in  AutoCAD Civil 3D and Surfer, calculation of borrow area design cut and side slope volumes in AutoCAD, and processing  of geotechnical data for client submittals utilizing gINT.   Ms. McCoy assists with vibracore collection and detailed analyses of the cores, which includes logging, sampling,  photographing, torvane testing, and creating beach and borrow area composite spreadsheets. She also performs and  reviews sieve and carbonate analysis of sediment samples. She creates borrow area permit and construction sheets that  include plan and cross section views of sediment deposits utilizing AutoCAD, and creates shapefiles with metadata for  ROSS submittals, report figures and field maps utilizing GIS.   Ms. McCoy compiles state and federal permits for approval of data collection, responses for agency Requests for  Additional Information, Joint Coastal Permit Application data and QA/QC documents for agency approvals. She assists  with geotechnical report preparation, and coordinates directly with Florida Department of Environmental Protection  (FDEP) officials on borrow area and sediment data needs. She is also responsible for signing and sealing various borrow  area design permit and construction sheets, along with PG Certification letters for sediment sample analysis.  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Project Geologist, US Bureau of Ocean Energy Management (BOEM)  Inventory of Potential Beach Nourishment and Coastal Restoration  Sand Sources on the Atlantic Outer Continent Shelf Project  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)    N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Ms. McCoy is responsible for the geotechnical analysis and review.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Project Geologist, Florida Department of Environmental Protection  Sediment Analysis, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)    N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Ms. McCoy coordinated sediment sample testing and data needs with FDEP. Logged samples, reviewed sediment  sample sieve analysis data, and compiled PG certification letter for sample analysis.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Project Geologist, Delray Beach Fifth Beach Renourishment Project  Delray Beach, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)    N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Areas I and II, geotechnical analysis and borrow area design assistance and volume calculations along with compiling  geotechnical investigation reports and permit preparation.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  11  01C032018D    d.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Project Geologist, Longboat Pass Maintenance Dredging and Beneficial  Use Project, Manatee County, FL  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2014  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Ms. McCoy was responsible for the 2014 Longboat Pass dredge area, geotechnical and volume analysis.  e.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Project Geologist, Oyster Bayou Marsh Restoration, CPRA, Cameron  Parish, Louisiana  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2013  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Oyster Bayou Borrow Area geotechnical analysis, borrow area design, and geotechnical report.         City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  12  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Douglas W. Mann, PE, DCE  Senior Coastal Engineer a. Total 31  b. With Current Firm 31  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  MS/Coastal Engineering, University of Florida/1987  BCE/Civil Engineering, University of Delaware/1985  Professional Engineer, Civil Engineering: FL, DE, LA, MA  18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Academy of Coastal Ocean, Port, and Navigation Engineers, American Society of Civil Engineers, ASCE‐ACOPNE  Diplomate of Coastal Engineering, Florida Shore and Beach Preservation Association, American Shore and Beach  Preservation Association, Florida Shore & Beach Preservation Association, Per Bruun Distinguished Service Award for  excellence in all aspects of coastal engineering, 2017.  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Storm Berm Nourishment – City of Deerfield Beach  City of Deerfield Beach, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2016  2005‐2006  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Mann contributed to the coastal engineering permitting and design services for a beach nourishment project  along the shoreline damaged by Hurricane Matthew. Services provided include geotechnical testing of native and fill  sands, preliminary design, and submittal of an FDEP Coastal Construction Control Line (CCCL) permit application,   with recent permit issuance to help the City with a proactive mechanism to nourish their shoreline before and after  a storm.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Summary Planning Document for the Pinellas County Coastal  Management Program, Pinellas County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2010‐2011  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Mann provided content and review for the Summary Planning Document for the Pinellas Coastal Management  Program which details various aspects of the County’s Coastal Management Program (CMP), including its history,  program elements, funding needs for the next six years (FY 2012‐2017), and long term planning milestones through  FY 2021.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Anna Maria Island Shore Protection Program   Manatee County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2001‐present  2002, 2005‐2006, 2011  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Mann has assisted with various projects within Manatee County throughout his career. Mr. Mann worked as  engineer and principal author of the Limited Revaluation Report for the first renourishment of the Manatee County  shoreline. Performed economic analyses, littoral budget development, cost estimates, beach fill design, and detailed  initial project review. (2002). Since that time he has assisted with the 2006 Anna Maria Island Feasibility Study and  review and QA/QC support for the 2011 Longboat Pass geotextile groin placement and design and permitting for the  removal of the Cortez Groins and replacement with Permeable Adjustable Groins constructed in 2014.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  13  01C032018D    d.  (1) TITLE AND LOCATION (City and State)  SECTION F PROJECT #5 (2) YEAR COMPLETED  Longboat Key Comprehensive Erosion Control Program   Longboat Key, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  1995‐present  1996/97, 2001, 2003,  2005/06, 2010, 2011  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Mann works as the Project Manager and Senior Coastal Engineer for all aspects of the Longboat Key Erosion  Control Program. Mr. Mann has recently worked as co‐project manager and engineer for the evaluation of inlet  processes and feasibility study of alternatives to improve sand retainage on the shorelines adjacent to Longboat  Pass. Mr. Mann designed, permitted and assisted with construction phase services for two permeable adjustable  groins to stabilize a long‐standing erosion hot spot fronting the Islander Condominium. Additionally, Mr. Mann was  the Project Manager and Engineer of Record for two permeable adjustable groins, a terminal groin, and a small  truck fill to stabilize the shoreline adjacent to Longboat Pass. Mr. Mann also served as the Project Manager and  Engineer of Record for the implementation of an emergency nourishment of the northern mile of the Town’s beach.  APTIM provided construction engineering services to the Town including a detailed sand quality control and quality  assurance program  e.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Curtis Park Boat Ramp Improvements  Miami, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2013‐2017  2017  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm   Mr. Mann design and permitted boat ramp improvements to Curtis Park, which included replacement of a decayed  wood dock, addition of a new center marginal dock to assist in boat launching, repair to the existing boat ramp,  replacement of wooden dolphin piles, replacement of a failed concrete bag revetment develop a soil management  plan, provide for stormwater treatment, and parking lot expansion. Obtained SFWMD, USACE, and DRER permits.  f..  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  FDEP Coastal Construction Control Line Permitting Services  Within Palm Beach, Broward and Miami Dade County  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  1992‐current  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm   Mr. Mann has obtained approximately 75 Coastal Construction Control permits for various public and private clients  who wish to responsibly develop and improve the coast of south Florida.   g.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Upham Beach Stabilization Project   Pinellas County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2002‐present  2005‐2006  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Mann designed and permitted a stacked geotube T‐head groin system to achieve an increased beach  nourishment interval. The project included an assessment of the sediment budget to avoid downdrift impacts (2002‐ 2003). Mr. Mann was the Engineer of Record for the 2005‐2006 construction of the geotextile tube groin field.  Additionally, Mr. Mann served as Engineer‐of‐Record for the 2011 geotextile tube repair project.         City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  14  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  David Swigler, PE   Coastal Engineer a. Total 9  b. With Current Firm 9  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  MS /2009/Ocean Engineering   BS/2006/Civil Engineering  Professional Engineer, Civil, License No. 75548, Florida  Professional Engineer, Civil, License No. 33742‐E, Alabama  Professional Engineer, Civil, License No. 114850, Louisiana  Professional Engineer, Civil, License No. 38454, Texas  18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Mr. Swigler has worked on a variety of beach nourishment, marsh creation, dredging, shoreline stabilization, and marine  structure projects in the Gulf States, along the eastern seaboard, and throughout Florida. He has experience throughout  the various stages of the project planning and implementation process including feasibility studies, engineering and  design, permitting, coordination with regulatory agency, budgeting, construction administration, and performance  monitoring. This diverse experience is the foundation for Mr. Swigler’s ability to administer, oversee, and manage  coastal restoration programs from inception through to construction.  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Indian River County Beach Preservation Plan   Indian River County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2015    BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Project manager for the 2015 update to the County’s Beach Preservation Plan. The update assessed the condition of  its coastline, performance of prior management activities, and the continued use of beach nourishment vs.  implementation of coastal structures as future management strategies. Numerical modeling evaluated project  performance. A storm impact analysis coupled with GIS quantified reduction in property damages due to coastal  management. A recreational benefits analysis assigned an economic value to the beaches. Design, permitting,  construction, and monitoring costs were optimized to develop long term, cost effective management strategies for  the next 30 years. Mr. Swigler was responsible for managing the study, performing engineering analyzes, developing  the Plan, administering public meetings, and presenting to the beach advisory committee and Board of County  Commissioners.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Indian River County  Sector 3 Dune Repair Project, Indian River County, Florida   PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2012‐2014  2013‐2014  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Project manager and engineer of record for the Sector 3 Dune Repair. The project, constructed the winter of  2013/2014, repaired the initial Sector 3 project that sustained damages from Hurricane Sandy in 2012. The dune  repair project involved truck‐hauling and placing 175,000 CY of sand from an upland source along ~6 miles of  coastline. The dune was vegetated with 189,000 native plants. Mr. Swigler was responsible for the design,  permitting, and construction of the project. This involved quantifying storm losses, designing fill templates,  coordinating with state and federal permitting agencies, developing construction plans and specifications, assisting  with bid solicitation, managing construction.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  15  01C032018D    c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Groin Rehabilitation Execution Plan, Town of Palm Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2011  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Project manager and coastal engineer responsible for development of the Execution Plan to rehabilitate  deteriorated groins within the Town. Plan included site visits to update the structure inventory, consolidation of  findings, and development of a plan to assist the Town’s decision‐making process on a multi‐phased, multi‐year  capital improvements project. Mr. Swigler was responsible for coordinating site visits, developing the Plan, obtaining  permits, and estimating construction costs to implement the plan.  d.  (1) TITLE AND LOCATION (City and State)  SECTION F PROJECT #5 (2) YEAR COMPLETED  Gulf State Park, Alabama  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2010  2010  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Coastal engineer and engineer of record responsible for the assessment of coastal conditions and of storm  protection alternatives for development of recreational facilities at Gulf State Park, Alabama. The assessment  included numerical modeling to evaluate the level storm protection afforded by existing conditions and various  dune configurations. Mr. Swigler collaborated with the team’s various engineering disciplines to incorporate  structural designs into the assessment and to quantify potential wave loading during a 100‐year return period storm  event.        City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  16  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  William Reilly, PE  Senior Coastal Engineer a. Total 12  b. With Current Firm 2  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Jacksonville, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  MS/2005/Coastal and Oceanographic Engineering  BS/2003/Civil Engineering  Professional Engineer, Civil, License No. 69050, Florida  Professional Educator (Physics), License No. 1259656, FL  18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  William Reilly is a senior coastal engineer project manager with 12 years of technical experience on civil works projects  including shore protection, marsh restoration, and navigation projects. His expertise includes, coastal processes  analysis, historical shoreline and volume change analysis, statistical storm return period analysis, storm damage  modeling, post‐storm damage assessments and subsequent shoreline restoration, numerical modeling of coastal littoral  transport and ocean wave propagation, geotechnical analysis for the development of beach nourishment borrow areas,  beach nourishment and coastal structure design, preparation of construction plans and specifications, construction  performance assessment for economic optimization, construction and contract management/oversight, post‐ construction performance monitoring, and coastal permitting.  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Sector 3 Beach and Dune Restoration Project, Indian River, Florida –  Indian River County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2018  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Senior Coastal Engineer – Performed post‐construction monitoring for this 6‐mile length of coastline that was  nourished in 2010‐12 (~560,000 cy) and renourished in 2014‐15 (~175,000 cubic yards). The project was recently  impacted by Hurricane Matthew in October 2016. Provided design and permitting efforts for a subsequent beach  nourishment project. This involved quantifying storm losses from the design fill template, coordinating with state  and federal permit agencies, and developing construction plans and specifications.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Sector 5 Beach Restoration Project, Indian River, Florida – Indian River  County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2018  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Senior Coastal Engineer – Implemented the County’s Beach Preservation Plan by performing design and permitting  efforts for an initial beach restoration project along a 3‐mile length of coastline identified to have the greatest  economic benefit. Efforts included developing a preliminary design and feasibility report, as well as developing a  Joint Costal Permit (JCP) application. This effort included historical shoreline and volume change analysis,  geotechnical sand search, preliminary design, storm impact modeling, and project cost estimating.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  South Palm Beach Island Comprehensive Shoreline Stabilization  Project, Palm Beach, Florida – Palm Beach County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2018  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Senior Coastal Engineer – Performed post‐construction monitoring for this 6‐mile length of shoreline. Mr. Reilly  performed a technical review of this proposed shore stabilization project which included seven rock groins and  ~100,000 cubic yards of beach fill. This project addressed erosion concerns and provided additional storm  protection while minimizing impacts to nearshore hardbottom. In addition, provided coastal engineering technical  review, developed permit documents, and coordinated with stakeholders.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  17  01C032018D    d.  (1) TITLE AND LOCATION (City and State)  SECTION F PROJECT #5 (2) YEAR COMPLETED  SR A1A Timucuan Multi‐Use Trail, Florida Department of  Transportation, Duval County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2017  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Senior Coastal Engineer – Worked for FDOT to assure compliance of a CCCL environmental permit issued for a  project located along SR A1A (Hecksher Drive) on the south end of Little Talbot Island along Fort George Inlet. The  project entailed installation of an 800‐foot cantilever sheet pile bulkhead with a concrete cap fronting SR AIA, and  construction of a 12‐foot wide multi‐purpose trail immediately adjacent to the bulkhead.         City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  18  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  João P.H. Dobrochinski  Numerical Modeler a. Total 13  b. With Current Firm 10  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  MSc/Hydraulic Engineering/Delft University of Technology/  Specialization Coastal Engineering/2014  BSc/Oceanography at Universidade do Vale do Itajaí/2009    18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  João P.H. Dobrochinski has experience in planning, measuring, processing and interpreting environmental data,  implementing/calibrating numerical models, and estimating design parameters for dimensioning coastal and port  structures. Over the last years, Mr. Dobrochinski has been directly involved on several numerical modeling projects  related to wave propagation, interaction of waves and vessels, hydrodynamics, coastal flooding, sediment transport and  morphology changes, oil spill simulations, water quality, salinity and residence time studies, and sediment plume  dispersion from dredging activities. Within these studies, coastal, beach and inlet issues along the Gulf and East Coast of  the United States were investigated using measured data and state‐of‐the‐art numerical models. Subsequently, the  effects of engineering alternatives were evaluated to access their performance and quantify impacts on neighboring  coastal and estuarine areas.   19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Numerical Modeler, Blind Pass Inlet Management Study, Captiva  Erosion & Prevention District, Captiva Island, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  April 2016 – Present  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Dobrochinski is the numerical modeler for the modeling study. The primary focus of this inlet management  study is to develop an updated sediment budget for the inlet and to evaluate strategies of inlet sediment  management with the objective of balancing the sediment budget between the inlet and adjacent beaches on  Captiva and Sanibel Islands. The numerical model Delft3D was calibrated based on measured waves, hydrodynamics,  and morphology changes. The modeling tool is used to evaluate the performance/impacts of different alternatives  on short and longer term (after construction, after 1 and 5 years) and during tropical storm events.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Numerical Modeler, Coordinator, Gateway Triangle Improvements  Discharge Impact Modeling Study, Collier County, Naples, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2015  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Dobrochinski conducted a numerical modeling analysis of the dead‐end Brookside Marina Canal utilizing  Delft3D, HEC‐HMS, and HEC‐RAS. Models were used to assess hydrodynamics and flooding of residential areas due  to storm water discharge of a drainage pump station during average and tropical storm conditions. The project  included coastal hydrodynamic simulations (Delft3D), river basin and precipitation characterization, run‐off  computations (HEC‐HMS), and hydraulic simulations (HEC‐RAS).  c.  (1) TITLE AND LOCATION (City and State)  SECTION F PROJECT #5 (2) YEAR COMPLETED  Numerical Modeler, Plaquemines Parish Sustainability Study,  Plaquemines Parish Consolidated Government, Plaquemines Parish,  Louisiana  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2011‐2012  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Senior Coastal Engineer – Worked for FDOT to assure compliance of a CCCL environmental permit issued for a  project located along SR A1A (Hecksher Drive) on the south end of Little Talbot Island along Fort George Inlet. The  project entailed installation of an 800‐foot cantilever sheet pile bulkhead with a concrete cap fronting SR AIA, and  construction of a 12‐foot wide multi‐purpose trail immediately adjacent to the bulkhead.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  19  01C032018D    d.  (1) TITLE AND LOCATION (City and State)  SECTION F PROJECT #5 (2) YEAR COMPLETED  Numerical Modeler, Figure Eight Island Inlet and Shoreline  Management Project, Figure Eight Island Homeowner’s Association,  Rich Inlet, North Carolina  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2010  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Dobrochinski was actively involved in the numerical wave modeling of waves, currents, sediment transport, and  beach inlet morphology utilizing the numerical model Delft3D. The developed model was used to evaluate  performance of inlet relocation alternatives, beach nourishment and terminal groins at Rich Inlet, North Carolina,  supporting technical recommendation for the Figure “8” Island Homeowner’s Association.  e.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Numerical Modeler, Impacts on Design of Coastal Protection  Structures, Thompson Engineering, Gulf State Park, Alabama  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  July 2016 – April 2017  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Dobrochinski performed Delft3D, SBEACH and XBEACH numerical modeling of flow, waves and morphological  changes to evaluate the impacts of extreme events to support the design of the coastal protection structures in Gulf  State Park, Alabama. The numerical modeling tools were applied to estimate the interaction of waves and storm  surge, evaluate flow/wave loads on coastal structures, and determine the impact that individual storm events have  on the dune system. Based on that, optimal vertical and horizontal structure locations were recommended in order  to optimize project design and minimize their vulnerability to various return period storm events.         City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  20  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Zhifei Dong, PhD  Numerical Modeler a. Total 8  b. With Current Firm 4  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  PhD/Ocean/Coastal Engineering/University of Delaware/2013  BS/Ocean Physics/Ocean/University of China/2009    18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Zhifei Dong’s primary focus has been the development of an original and advanced code to simulate barrier island and  coastline morphology over long periods. The model includes coastal processes such as longshore and cross‐shore  sediment transport, wave transformation, and beach storm response.  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  USACE Regional Sediment Management Project Phase II PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2016  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  GIS Analyst, Developed ArcGIS python scripts to manage and display USACE dredging database since 1998. The final  deliverables are web‐based ArcGIS map showing dredging data statistics for all the districts.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  USACE JALBTCX East Coast LiDAR PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2015  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Developed ArcGIS python scripts to generate tables and maps and quantify changes such as shoreline change, dune  crest and toe line change, volume change.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Robinson Preserve Habitat Restoration Modeling Study, Manatee  County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2014  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Numerical modeling (Delft3D‐FLOW) of tidal exchange to evaluate circulation and residence time for the existing  conditions and proposed design and sediment mobility analysis in the flushing channels.  d.  (1) TITLE AND LOCATION (City and State)  SECTION F PROJECT #5 (2) YEAR COMPLETED  2017 Coastal Master Plan Model Development PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2016  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  In order to simulate the morphology of the coast in response to storms and average wave climates, he wrote a  model code to simulate critical processes including sediment transport, wave transformation, and morphological  changes.  e.  (1) TITLE AND LOCATION (City and State)  SECTION F PROJECT #5 (2) YEAR COMPLETED  USACE Regional Sediment Management Project PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2014  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Development of a barrier islands and inlet model for Coastal Inlets Research Program to include major processes  such as longshore transport, overwash, sea level rise. Documented surveyed data on historical bathymetry change,  land loss, shoreline retreat, storm impacts on barrier islands migration and inlet morphological evolution in coastal  Louisiana. Quantified sediment transport rate and volume change at barrier islands, ebb tidal delta, inlet channel  and back barrier bay corresponding to different sea level rise rates.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  21  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Neil Campbell  Environmental Engineer a. Total 26  b. With Current Firm 26  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Miami Lakes, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  BS/Geology, University of Edinburgh/ 1990    18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Mr. Campbell’s environmental remediation background has included successfully completing over 40 CARs and SARs  and over 30 RAPs utilizing a multitude of remediation technologies at various facilities. These facilities range from large  petroleum bulk storage terminals to corner gas stations and emergency response spills and dry‐cleaners.  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Contract Manager, DERM Environmental Cleanup, Compliance, and  Related Services  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2017‐Present  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Manage the assessment and remediation as requested by DERM and county agencies in accordance with Chapter 24  under a DERM contract.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Regional Senior Program Manager for 7‐Eleven, Inc. PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  1999 – Present  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Managing Florida District work with over 240 active projects ranging from UST upgrades to assessment and  remediation. Projects are conducted by a team of 20 personnel from four Florida offices. Mr. Campbell’s  responsibility includes client liaison and oversight of regulatory correspondence, management of staff in the QA/QC  program review, and management of project personnel and resources. Conducts budget and scope reviews at  program level and meetings with client to assist in planning and identification of the materials and practices  required by store operators to reduce compliance risk.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  FDOT District 6, District Wide Contamination Assessment and  Remediation Services Contract  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2007 – Present  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Campbell provided oversight of the contract management team and program quality control. He was  responsible for customer satisfaction; monthly and weekly client meetings, as needed; contract submittals and  reports; oversight of the development and execution of Work Plan/Cost Estimates. He currently acts as QA/QC and  Resource coordinator supporting the Contract Manager.         City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  22  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Joshua Blanco, CHMM  Environmental Engineer a. Total 18  b. With Current Firm 13  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  BS/Biological Science/Florida Atlantic University/1999  Certified Professional Erosion & Sediment Control (CPESC),  License No. 4446‐IT, Nationwide  FDEP Qualified Stormwater Management Inspector, License No.  16587, Florida  Certified Hazardous Materials Manager (CHMM), License No.  14027, Nationwide  AHERA Asbestos Inspector  18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Joshua Blanco has performed and managed permitting for environmental cleanup and construction projects;  environmental compliance audits; Phase I, Phase II, NEPA environmental due diligence assessments and environmental  impact studies; soil and groundwater investigations; design, operation and maintenance of groundwater remediation  systems; storage tank inspection and compliance programs; oversight of hazardous, non‐hazardous, and solid waste  management operations; and storage tank removal operations. Currently, Mr. Blanco serves as the area safety  representative responsible for developing and reviewing health and safety plans as well as serves as one of the office  emergency response program coordinators.  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Contamination Assessment and Remediation, Florida Department of  Transportation District VI, Miami Dade and Monroe Counties, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  Ongoing  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  As a Project Manager, Mr. Blanco is supporting Florida Department of Transportation, District VI’s business with an  emphasis on the identification, handling, assessment and remediation of hazardous and non‐hazardous materials on  state roadways or any situation that presents an immediate threat to the environment or citizens. His  responsibilities include Level I site screening evaluations, impact to construction assessments, bridge asbestos  inspections, subsurface investigations, technical report writing, remediation, compliance and construction oversight.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Miscellaneous Environmental Services Contract, City of Miami, Public  Works Department, Miami, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  Ongoing  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Blanco supports this contract by serving as the Task Manager/Technical Lead for several Phase I and Phase II  Environmental Site Assessments including some projects requiring NEPA compliance.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Environmental Services for I‐595, Dragados USA, Inc., Broward County,  Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2012  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Blanco serves as Project Manager for environmental consulting services contract including permit compliance,  environmental monitoring, assessment and remediation during construction activities.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  23  01C032018D    d.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Environmental Services Alliance Contract, 7‐Eleven, Inc., Various  Locations, Gulf Southeast US  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  Ongoing  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  As Health & Safety Officer, Mr. Blanco supports this contract by developing health and safety plans and conducting  safety audits for the many client projects including: emergency spill response, Phase I and II environmental due  diligence, asbestos surveys, subsurface investigations, remediation activities, dewatering treatment and remedial  system installation.         City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  24  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Jason Whitman, PG  Environmental Engineer a. Total 21  b. With Current Firm 18  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  MS/Geology/Florida Atlantic University/1999  BS/Geology/Florida Atlantic University/1997  Professional Geologist, Florida PG2379; 2005  Certified Hazardous Materials Manager, 12170  18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  As a senior hydrogeologist, Mr. Whitman has utilized his technical expertise to delineate contaminant plumes, evaluate  contaminant pathway migration patterns, and design and installation of groundwater remediation systems. He is well  versed in the application of federal, state, and local environmental regulations. During his graduate studies he worked  with Dr. Jorge Restrepo to develop a MODFLOW computer model to replicate the process of evapotranspiration for the  SFWMD.  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  SFRTA/TRI‐RAIL – FDOT Miami Railyard, West Palm Beach Layover  Facility, and the full 72‐mile rail corridor, Dade, Broward & Palm Beach  Counties, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)   N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Project Manager ‐ Manages the full‐time Operation and Maintenance of the onsite Water Treatment Plant  responsible for treating all Industrial Process Water and Stormwater generated at the FDOT Miami Railyard,  oversees environmental compliance by all Users of the South Florida Rail Corridor (SFRC), performs ACM & Pb  inspections on Facilities, prepares and maintains SWPPP and SPCC plans, and audits all Users of the SFRC.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Scott Homes – Sectors I ‐ IV, Opa Locka, Florida PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)   N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Project Manager ‐ Managed the assessment and remediation of a former dump site located adjacent to the Gwen  Cherry landfill for residential development with lead contamination present at hazardous levels in accordance with  Chapter 24 under former DERM contract.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Miami International Airport, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)   N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Project Manager ‐ Managed the development of a remedial action plan, aquifer test, and pilot test project for a  former military cargo area (Bldg. 2129) that was impacted by chlorinated solvents for review by DERM. Managed the  assessment and transportation and disposal of petroleum contaminated soil from construction activities at MIA  related to both North and South Terminal construction activities for FDEP.         City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  25  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Lauren Floyd, MS  Senior Marine Biologist a. Total 20  b. With Current Firm 11  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  MS/Marine Biology/Coastal Zone Management, Nova  Southeastern University/2006  BS/Middlebury College/1997    18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  BOEM Protected Species Observer; PADI (Divemaster, Rescue Diver, Advanced Diver, Enriched Air Nitrox Diver, Dry Suit  Specialty; Diver); DAN O2 Administration Certification; Member: FSBPA, ASBPA, FAEP, NAEP  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Broward County Shore Protection Project, Segments II and III  Broward County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2003‐on‐going  2005‐2006  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm   Ms. Floyd was project biologist for the Broward County Shore Protection Project. At APTIM, she worked on this  project during the post‐construction phase of monitoring. She led field investigations and conducted monitoring on  both the nearshore hardbottom and the artificial reef. She also assisted with ESA Section 7 Consultation and  contributed to the preparation of an EA for NEPA compliance.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Anna Maria Island Shore Protection Program  Manatee County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2006‐present  2005‐2006, 2011, 2014  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Ms. Floyd has managed environmental services for coastal projects along Anna Maria Island since 2006. She  managed all post‐construction hardbottom and artificial reef surveys, environmental data analysis and report  preparation for the 2005/2006 Anna Maria Island Storm Repair Project and was responsible for all environmental  permitting, agency coordination, UMAM preparation, development and implementation of environmental  monitoring plan and environmental reporting for the 2011 Coquina Beach and City of Anna Maria Beach  Nourishment Projects. She also assisted with the design, construction observation and monitoring of the mitigative  artificial reef built to mitigate for anticipated impacts from the Coquina Beach nourishment. Ms. Floyd prepared the  Environmental Assessment for the 2013/2014/2015 Central Beach Nourishment Project in compliance with National  Environmental Policy Act (NEPA) requirements.  c.  (1) TITLE AND LOCATION (City and State)   (2) YEAR COMPLETED  Collier County Beach Nourishment  Collier County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2006‐present  2006, 2010, 2011,  2012, 2013‐14, 2015,  2016  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Ms. Floyd has assisted Collier County with agency coordination, permitting, development of environmental  monitoring plans, coordination and implementation of field activities, data analysis, and report preparation. She has  performed biological surveys of natural hardbottom and artificial reef habitats including in situ identification and  abundance of flora and fauna in support of the Collier County Beach Nourishment Projects. She has also prepared  environmental documents in support of National Environmental Policy Act, Endangered Species Act Section 7  Consultation, and Magnuson‐Stevens Fishery Conservation and Management Act in support of the beach  nourishment projects.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  26  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Stacy Buck, MS Senior Marine Biologist a. TOTAL   b. WITH CURRENT  FIRM  17  11  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND  DISCIPLINE)  M.S., Coastal Zone Management, Nova Southeastern  University, Dania Beach, Florida, 2007  B.S. Marine Science, University of South Carolina, Columbia,  South Carolina, 1999  SDI Divemaster, 2012  Dry Suit Specialty Diver, 2009  Enriched Air Nitrox Diver, 2003  PADI Rescue Diver and Advanced Diver, 2003  AAUS Scientific Diver, 2003  BOEM and NMFS Protected Species Observer, 2007  18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Associations: American Academy of Underwater Sciences (AAUS) Dive Control Board Member; Member, Florida  Association of Environmental Professionals (FAEP); Member, American Shore and Beach Preservation Association;  Member, Florida Shore and Beach Preservation Association  Qualifications: Ms. Buck is the principal biologist at APTIM and has conducted biological monitoring and provided  permitting services for public and private sector clients throughout south Florida. She has extensive experience in the  design and implementation of monitoring programs for marine resources, including long‐term programs for natural and  artificial reefs, implementation of coral restoration and relocation programs, seagrass habitat assessments and marine  wetland delineation. Ms. Buck is responsible for the complete management of biological monitoring projects from pre‐ permit application coordination through final report and compliance deliverables.   Stacy Buck has over 17 years of experience in biological and environmental science, the last 14 of which have focused on  coastal and marine biology in south Florida. Ms. Buck began her career in marine biology in south Florida working on the  Broward County Segment III SPP in 2004. She has conducted over 750 scientific dives in Broward County in direct support  of the County’s shore protection projects. This intense and extensive experience provided Ms. Buck with a thorough  understanding of the County’s nearshore hardbottom habitat, the importance and sensitivity of this resource and how it  is affected by construction activities.   19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Broward County Segment III SPP PROFESSIONAL SERVICES  CONSTRUCTION (If  applicable)  2004 – 2011  2005/06  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  ☒ Check if project performed with current firm  Ms. Buck conducted biological monitoring of nearshore natural hardbottom to determine if impacts occurred beyond  the ETOF during pre‐ and five years post‐construction. She mapped the hardbottom edge to document shifts in sand  movement adjacent to the project area and also monitored the Segment III artificial reef deployed as mitigation to  anticipated impacts to the nearshore hardbottom to assess ecological function over time. Led the data analysis and  production of permit‐required annual report production.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  27  01C032018D    b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Broward County Segment II SPP PROFESSIONAL SERVICES  CONSTRUCTION (If  applicable)  2011 ‐ 2015  2016/17  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  ☒ Check if project performed with current firm  Ms. Buck was the lead biologist for the Segment II project. Conducted a baseline investigation of the habitat to  support the JCP permit application. Completed environmental permitting, which included development of a  biological monitoring plan, a coral relocation plan and a mitigation plan for FDEP and USACE. Helped develop the  mitigation siting for the artificial reef placement. Prepared environmental documents in support of National  Environmental Policy Act, Section 7 consultation under the Endangered Species Act and an Essential Fish Habitat  Assessment under the Magnuson‐Stevens Fishery Conservation and Management Act. Led the operations of the pre‐ construction biological monitoring which documented conditions of the benthic habitat prior to sand placement.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  USACE, Broward County Segment I Nearshore Reef Assessment  PROFESSIONAL SERVICES  CONSTRUCTION (If  applicable)  2010 ‐ 2011  NA  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  ☒ Check if project performed with current firm  Ms. Buck led the operations to conduct a comprehensive characterization of the benthic habitat using  photointerpretation of aerial imagery for hardbottom resources with in situ groundtruthing and in situ quantitative  assessments of the hardbottom. She developed and implemented the characterization plan, which include  delineation of nearshore hardbottom resources from high quality geo‐referenced true color aerial photographs and  completion of video groundtruthing using a towed DGPS‐integrated high‐resolution camera system that incorporates  positioning data for each frame directly on the video record was used to conduct the video documentation. The  video was viewed during filming onboard the boat and a marine biologist took notes of benthic resources. Following  the video transects, we conducted quadrat‐based benthic assessments of the hardbottom along cross‐shore  transects that implemented quadrat assessments, line‐intercept for hardbottom, sediment depth measurements,  relief measurements and fish census surveys. The final component of the benthic mapping and characterization of  Segment I include an investigation for the threatened coral species of Acropora spp. The quantitative data, video  transect documentation and still photographs were put into an interactive geodatabase created using ArcGIS.  d.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  City of Delray Beach Fifth Periodic Renourishment PROFESSIONAL SERVICES  CONSTRUCTION (If  applicable)  2012 ‐ 2014  2013  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  ☒ Check if project performed with current firm  Ms. Buck provided permit support for the project including permit application, ESA Section 7 Consultation,  production of an EFH Assessment in support of the Magnuson‐Stevens Act, and compliance with NEPA through  production of an EA. Ms. Buck also lead field investigations on the reef east of the borrow areas to survey for the  threatened coral species Acropora spp. and to map the pre‐ and post‐construction conditions of the reef edge  closest to the borrow areas. She also coordinated with the sea turtle monitoring team to ensure all required  monitoring was taking place and reported appropriately.  e.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Town of Palm Beach Reach 7, Phipps Ocean Park Mitigative Reef  Monitoring  PROFESSIONAL SERVICES  CONSTRUCTION (If  applicable)  2006 ‐ 2008  2006  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  ☒ Check if project performed with current firm  Ms. Buck managed the monitoring of the 3.1‐acre artificial reef constructed as mitigation for the Reach 7, Phipps  Ocean Park Beach Restoration Project. Monitoring continued on a semi‐annual basis for four years post‐deployment.  The biological monitoring included quadrat assessments for benthic cover, photo‐ and video‐documentation, belt‐ transects for invertebrate species, and line‐intercept locations for monitoring sediment coverage. Fish surveys were  also conducted during each monitoring event and sea turtles were enumerated at each site. These data were  analyzed to determine mitigation success based on a statistical comparison of the community structure on the  artificial reef to that on the effected hardbottom.     City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  28  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Kathryn Brown, MS  Marine Biologist a. Total 12  b. With Current Firm 4  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  MS/Marine Biology, Nova Southeastern University, Dania  Beach, Florida, 2016  BS/Environmental Science, Fordham University, Bronx, New  York, 2006    18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Certifications/Registrations: AAUS Scientific Diver, 2008; PADI Divemaster, 2008; Enriched Air Nitrox Diver, 2006; PADI  Rescue Diver, 2007; PADI Advanced Diver, 2006; PADI Open Water Diver, 2005; Emergency First Responder, CPR, 1st  Aid, AED; DAN O2 Administration; Divers Alert Network (DAN) Member, 2005  Professional Affiliations: American Academy of Underwater Sciences (AAUS) Dive Control Board; Member, Ecological  Society of America, 2016; Member, American Shore and Beach Preservation Association (ASBPA); Member, Florida  Shore and Beach Preservation Association (FSBPA)  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Lido Key Hurricane and Storm Damage Reduction Project  City of Sarasota, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2014‐Present  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Ms. Brown assisted with the environmental portions of the permit application for the Lido Key Hurricane and Storm  Damage Reduction Project. Ms. Brown also assisted with seagrass surveys in Big Sarasota Pass.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Coquina Beach Nourishment Project, Manatee County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2014‐Present  2014  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Ms. Brown performed biological monitoring/assessments including assessment of natural and artificial reef habitat  related to the construction of the Coquina Beach Nourishment Project.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Broward County Shore Protection Project Segment II  Broward County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2004 – 2015    BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Ms. Brown was lead field biologist and conducted biological monitoring of the nearshore hardbottom. The  monitoring included benthic characterization, sedimentation analysis and hardbottom delineation methods. Duties  included managing field logistics and personnel and data management.  d.  (1) TITLE AND LOCATION (City and State)   (2) YEAR COMPLETED  Pompano Pier Replacement Project, Pompano Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2014  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Ms. Brown conducted a benthic resources investigation, in addition to hardbottom biological monitoring methods,  included the NMFS Recommended Survey Protocol for Acropora spp. in support of Section 7 Consultation.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  29  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Jeffrey Andrews, PSM, CH  Director of Hydrographic Survey a. Total 36  b. With Current Firm 33  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  MS/Ocean Science/NSU/1995   BS/Marine Science/ UNCW/1979  1998/Professional Surveyor and Mapper/Florida (PSM)  1989/ACSM Certified Inshore Hydrographer (CIH)  18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  ACSM Certified Inshore Hydrographer #104 (CIH), NITROX Certification, PADI Advanced Open Water SCUBA Diver, NAUI  Open Water SCUBA Diver  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Geophysical and Geotechnical Sand Search Investigation, Sand Key  Pinellas County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2009  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Andrews coordinated the USACE Jacksonville District and Pinellas County on a marine‐based sand search to  locate two million cubic yards (mcy) of beach compatible sand within and in‐between existing USACE Sand Key Study  Areas, as well as areas closer to Sand Key. A high‐resolution geophysical survey was conducted in areas close enough  to Sand Key to optimize construction costs, but far enough offshore to avoid shoreline impacts, with the final survey  areas defined in close consultation with Pinellas County and the USACE. The geophysical survey (seismic sub‐ bottom, sidescan sonar, fathometer, and magnetometer) were conducted over the course of six field days.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Lido Key Beach Nourishment Projects   City of Sarasota, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  1998‐present  1998, 2001, 2003,  2009, 2015  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Andrews has assisted the City of Sarasota with geotechnical, geophysical and geomatics surveys and data  analysis since 1998. He assisted with geotechnical analysis of the New Pass ebb shoal borrow area and pre and post‐ construction physical surveys required to support the 2009 Beach Nourishment Project. The project won the ASBPA  Best Restored Beach Award for 2009.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Anna Maria Island Shore Protection Program   Manatee County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  1989‐present  2002, 2005/2006, 2014  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Andrews has provided geotechnical and survey support services for Manatee County since 1989. Recently, Mr.  Andrews directed all survey and geotechnical investigations for the Port Dolphin Beneficial Use Project including  seismic reflection profiles, sidescan sonar imagery and magnetometer surveys and vibracores and has conducted in  the field and sediment evaluations and borrow area design from the office. In addition to geotechnical studies to  locate and evaluate sediment sources he has directed physical monitoring, bathymetric and hydrographic, for all  Manatee County projects since 1989.     City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  30  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Michael Lowiec, PSM  Hydrographic Surveyor a. Total 13  b. With Current Firm 13  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  BS/Marine Science/Coastal Carolina University/2002  Florida Registered Professional Surveyor and Mapper   18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Hypack Certified  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Miami‐Dade County Annual Beach Profile Surveys   Miami‐Dade County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2013  2005, 2011, 2017  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Lowiec is the surveyor of record and in charge for all field and office operations for the Miami‐Dade County  Annual Beach Profile surveys. APTIM conducted the annual monitoring surveys from 2004 to 2012 under Mr.  Lowiec’s direction. Topographic and hydrographic survey profiles were conducted at each FDEP R‐monument. A fully  certified survey report detailing the methods employed and results was delivered to the County.   b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Lido Key Beach Nourishment Projects ‐ Annual Physical Monitoring  Surveys and Reports, City of Sarasota, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2009  2009, 2015  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Lowiec manages all geomatics services for the Lido Key projects. His team has conducted the post storm survey,  the annual monitoring surveys and the pre and post construction surveys. Mr. Lowiec is responsible for all  permitting requirements as they relate to survey (ECL's, annual monitoring reports, borrow area easement  development, etc.).  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Anna Maria Island Shore Protection Program ‐ Annual Physical  Monitoring Surveys and Reports for Anna Maria Island  Manatee County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2004‐present  2005/2006, 2011, 2014  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Lowiec has assisted Manatee County with all required field surveys and reviewing all topographic and  hydrographic survey data including: multibeam sonar surveys, beach profiles, inlet and shoal surveys, borrow area  surveys, and coastal structure surveys. He also has prepared permit required physical monitoring survey reports,  sovereign submerged land leases and easements and mean high water surveys, FDEP required 62B surveys and  erosion control lines.  d.  (1) TITLE AND LOCATION (City and State)   (2) YEAR COMPLETED  Broward County 2015 Mean High Water Survey and Erosion Control  Line  Broward County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2014  2011, 2015  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Mr. Lowiec was the surveyor of record and in technical charge of field and office operations for the Broward County  Mean High Water Line and Proposed Erosion Control Line. Mr. Lowiec coordinated with the relevant State agencies  and performed the work in compliance with Chapter 161.141 of the Florida Statutes. A final certified map was  produced and delivered to the Florida Department of Environmental Protection and Division of State Lands.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  31  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Christopher “Jason” Walker  Hydrographic Surveyor a. Total 5  b. With Current Firm 5  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  MS/Geology/University of South Carolina/2011  BS/Geology/University of South Carolina/2007    18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Mr. Walker has conducted numerous single beam and multi‐beam sonar surveys along the water of the southeastern  U.S. and the Gulf of Mexico. He has participated in beach profile surveys; offshore borrow area surveys, and large‐scale  geophysical sand searches. In addition, Mr. Walker has amble experience conducting topographic surveys with  conventional survey gear as well as Real Time Kinematic Global Positioning Systems (RTK GPS). He leads data processing  and reporting efforts producing permit required survey reports and maps.  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  NE 16th Avenue Corridor Right‐of‐Way Verification and Topographic  Survey, Miami‐Dade, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2014  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Surveyor ‐ Miami‐Dade County Public Works contracted with APTIM to provide survey services for this project. The  work included verification of the NE 16th Avenue right‐of‐way as well as location of all improvements, overhead  utilities, and location, inverts, and material for storm and sanitary sewers. We performed all work under the direct  supervision of a Florida Registered Surveyor and Mapper. Mr. Walker was responsible for survey data acquisition  using RTK and Total Station system and assisted with data reduction and map preparation.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Miami‐Dade Annual Beach Profile Survey, Miami‐Dade, Florida PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2014  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Hydrographic & Topographic Surveyor ‐ APTIM has performed beach profile surveys on all of the County beaches  since 2004. APTIM has performed the permit required survey several times during our time under contract with the  County. APTIM utilizes state‐of‐the‐art survey technology to perform all tasks including RTK GPS, dynamic motion  compensators, and highly accurate digital sounders to ensure a top quality product for the County. APTIM has  performed the tasks within the allotted schedule and within budget. APTIM recently completed this survey in April  2014. Surveys were conducted at each FDEP R‐monument (R‐1 to R‐113) located at approximately 1000 foot  intervals throughout the project area. Additionally, we surveyed intermediate profiles from theoretical control  points at the halfway point between major monuments. APTIM surveyed 154 profiles station. We performed all  work under the direct supervision of a Florida Registered Surveyor and Mapper. Mr. Walker acquired all  hydrographic survey data using RTK, Motion Compensator, and Digital Echo Sounder as well as topographic data  collections using RTK GPS. He also assisted with data reduction and report preparation.  c.  (1) TITLE AND LOCATION (City and State)   (2) YEAR COMPLETED  Broward County Mean High Water and Erosion Control Line, Broward  County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2014  2011, 2015  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Associates (JV) selected APTIM to provide survey services for the 2014 mean high water survey and preparation of  an erosion control line. APTIM surveyors performed the survey and prepared all required drawings, public notices,  and other platting items as required by Chapter 161.141 of the Florida Statutes. We performed all work under the  direct supervision of a Florida Registered Surveyor and Mapper. Mr. Walker was responsible for collection of survey  data using the RTK GPS system. He also assisted with data reduction and map preparation.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  32  01C032018D    d.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Miami‐Dade Public Works Julia Tuttle Survey; Miami‐Dade, Florida PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2014  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Surveyor ‐ Miami‐Dade Public Works contracted with APTIM to provide a hydrographic survey of the navigation  channel along the Julia Tuttle Causeway. APTIM used RTK GPS to conduct survey control reconnaissance before field  activities began. We combined single‐beam sonar data with RTK GPS and heave, pitch and roll data to produce high  accuracy soundings of the navigation channel. APTIM reduced and presented all data on a final survey map. We  performed all work under the direct supervision of a Florida Registered Surveyor and Mapper. Mr. Walker was  responsible for taking tide measurements using RTK GPS system as well as hydrographic survey data acquisition  using RTK, Motion Compensator, and Digital Echo Sounder.       City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  33  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Angela M. Belden  Director of GIS/CAD Operations a. Total 30  b. With Current Firm 25  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  AS/Business Management/New Hampshire Technical  Institute, Concord, New Hampshire, 1985    18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Autocad 2013 Certified Professional; Autocad 2011 Civil 3d Certified Associate; Certification in Metadata for Geospatial  and Biological Metadata‐USGS 2002  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  APTIM Enterprise Database, Data Structure and Management  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)     BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm   Ms. Belden is our database architect and custodian. Ms. Belden directs GIS and Data Management staff supporting  GIS and data management needs of five regional offices. She has designed and developed workflows for editing and  data processing in SDE for concurrent editing, multiple projects, and phased versioning schemes. She has been  responsible for advancing and implementing technical solutions to the challenge of managing large datasets. These  innovations are designed to improve efficiency, reduce costs, and improve the quality of the data. She researches  new technology and suggests future database management direction. She directs in‐house training and assists with  the development of user documentation.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Lido Key Beach Nourishment Projects  City of Sarasota, Florida PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  1992‐present  1998, 2001, 2003,  2009, 2015  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  APTIM has performed engineering, environmental and survey services to the City of Sarasota since 1988 resulting in  the construction of four beach renourishment projects. We provided all design and permitting services for  construction of the most recent 2009 FEMA funded hurricane repair project. Ms. Belden’s role in all of these  projects includes assisting in the development of design options, preparing permit sketches and directing the  development of the construction plans. Ms. Belden also acts as data custodian for APTIM’s internal geodatabase and  ensures all project data and applicable metadata is stored within the data library. Ms. Belden performs QA/QC  review of all GIS and CAD documents produced for the project.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Anna Maria Island Shore Protection Program   Manatee County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  1992‐ongoing  1992‐1993, 2002,  2005‐2006, 2011, 2014  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  APTIM assisted the County with beach renourishment in 1992‐1993, 2002, 2005‐2006, 2011, and 2014. APTIM is  presently assisting the County with the design and construction of a southern jetty at Longboat Pass and with the  removal of three groins along Cortez Beach and replacement with Permeable Adjustable Groins. Ms. Belden’s role  includes oversight of the preparation of permit sketches, design project renderings and directing the development  of the construction plans. Ms. Belden is the primary architect and manager of the projects web‐based GIS database.    City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  34  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Heather Vollmer, GISP  GIS Analyst a. Total 17  b. With Current Firm 11  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  MS/Environmental Studies, Florida International University,  Miami, Florida 2010  BS/Environmental Studies, Richard Stockton College,  Galloway, New Jersey, 2003  GIS Professional (GISP), GIS Certification Institute, Des  Plaines, IL, 2011  18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Florida Master Naturalist‐University of Florida IFAS; Certificate of Geographic Information Systems, Richard Stockton  College, Pomona, New Jersey, 2003  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Lido Key Beach Nourishment Projects   City of Sarasota, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2006‐present  2009, 2015  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Ms. Vollmer was the GIS Analyst on this project. Her work included converting biological data to GIS format and  metadata creation, analysis of potential impacts on hard bottom resources, and creating supporting report  documentation and maps. Ms. Vollmer was also tasked with data management, and ensured that all project GIS  data was uploaded into APTIM’s geodatabase.  b.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  North End Renourishment and Structural Stabilization Project  Town of Longboat Key  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2009‐present  2014  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Ms. Vollmer is the Senior GIS Analyst on this project. Her work includes creating report documentation and maps,  permit sketches and long‐range budget planning supporting documentation. Ms. Vollmer is also tasked with data  management, and ensures that all project GIS data is uploaded into APTIM’s geodatabase.  c.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Coquina Beach Restoration Project  Manatee County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2006‐present  2011, 2014  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Ms. Vollmer is responsible for all GIS spatial analysis, data creation, maintenance and QA/QC support.  d.  (1) TITLE AND LOCATION (City and State)   (2) YEAR COMPLETED  Captiva and Sanibel Islands Beach Nourishment Project  Lee County, Florida  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  2006‐present  2006, 2008, 2013  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Ms. Vollmer is responsible for all GIS spatial analysis, data creation, maintenance and QA/QC support.       City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  35  01C032018D    E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  (Complete one Section E for each key person.)  12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  Gary Krystyniak  Senior CAD Designer a. Total 30  b. With Current Firm 7  15. FIRM NAME AND LOCATION (City and State)  Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  BS/2003/Behavioral Science  GIS Professional (GISP), GIS Certification Institute, Des  Plaines, IL, 2011  18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  Gary Krystyniak joined APTIM in 2011 and has over 30 years of design and drafting experience. His experience includes  various aspects of marine and port design including surface modeling, dredge volume calculations, scheduling,  conceptual drawings structural and mechanical drawings, as well as 3‐D graphics and animation. Mr. Krystyniak is  proficient in numerous design software, including AutoCad®, Microstation®, InRoad®s, Softdesk®, Land Development®,  Autodesk Civil 3D®, Bentley PowerCivil®, and Eaglepoint®.  19. RELEVANT PROJECTS  a.  (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  Coastal Design and Drafting Projects, Multiple Locations, U.S. – Aptim  Environmental & Infrastructure, Inc.  PROFESSIONAL SERVICES CONSTRUCTION (If  applicable)  Ongoing  N/A  BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  Senior CADD Designer – Worked on numerous coastal engineering projects. Select project experience includes:   Lido Key Tropical Storm Debby Repair Project Construction Plans    Town of Hillsboro Beach/City of Deerfield Beach Interim Beach Renourishment    Town of Palm Beach Southern Palm Beach Island Comprehensive shoreline stabilization Project    Indian River County Sector 3 Beach Renourishment Project    Lido Key Tropical Storm Debby Repair Project Permit Plans    Southern Palm Beach Island Comprehensive Shoreline Stabilization Project, Town of Palm Beach, Florida   Fire Island Inlet to Moriches Inlet Emergency Stabilization, Fire Island, New York    North Topsail Beach Shoreline Protection, North Topsail Beach, North Carolina    Collier County 2013‐2014 Beach Renourishment    City of Miami Curtis Park Boat Ramp Improvements   Seawinds Seawall Construction Project    Upham Beach Stabilization Project    Delray Beach Fifth Beach Renourishment    Pelican Landing Erosion Control Project    New River Inlet Channel Realignment and Beach Restoration    Pellicer Flats Mitigation Bank   West Belle Pass Barrier Headland Restoration Project    Shell Island Barrier Enhancement    Pelican Island Restoration Project    Port Mearim Brazil Port Development Project    Anna Maria Island Geotextile Tubes   Panama City Beach Renourishment   Captiva/Sanibel Island Beach Renourishment     01C032018D F: EXAMPLE PROJECTS City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  36  01C032018D    F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  THIS CONTRACT  (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  20. EXAMPLE PROJECT  KEY NUMBER  1  21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  Indian River County Sector 3 Dune Repair Project  Indian River County, Florida  PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  2013‐present  2005, 2011, 2017‐18  23. PROJECT OWNER’S INFORMATION  a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  Indian River County  James Gray, Coastal  Coordinator  772‐226‐1344  24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)    Indian River County following construction of the Sector 3 Dune Repair Project (2015).  Program Description:  Since 2013, APTIM staff have been providing quality coastal engineering consulting services to Indian River County.  During this time, we have successfully implemented major beach management initiatives for the County. Our team has  unequaled direct project experience on recent Indian River County beach restoration projects. This experience includes  beach management, feasibility studies, design, engineering, permitting, construction management, biological support  services, physical monitoring, grant writing assistance, and post‐storm assessments.  Project Description:  The initial Sector 3 Beach and Dune Restoration Project was completed in three phases between 2010 and 2012. The  initial project was 6.6 miles long and spanned from R‐20 to R‐55. Following completion of the initial project, the effects of  Hurricane Sandy passing off the coast of Florida in October 2012 resulted in significant dune erosion to the project area.  APTIM designed, permitted, managed construction, and currently monitors the Sector 3 Dune Repair Project,  constructed in the winter of 2014/15.  Instead of obtaining a new permit to address the damages, APTIM was able to obtain an FDEP permit modification for a  one‐time truck haul sand placement project to quickly address this need. There was tremendous savings of time and  money for the County to have the repair project implemented this way.   APTIM developed a feasibility study to specifically address the damages that occurred from Hurricane Sandy. The  renourishment project was to have “no impact” to the nearshore hardbottom communities fronting the project area.  The final project design entailed a modest dune feature and planting of dune vegetation from Treasure Shores Beach  Park south to northern John’s Island (R‐24 to R‐55). All construction activities occurred seaward of the existing dune  vegetation line and above the Mean High Water Line (MHWL).   Sand for the construction was obtained from two upland sand sources, Blue Goose Mine (f.k.a. Hammond Mine) and  Davis Mine, and transported to the project site via truck haul method. In total, the project placed approximately 173,068  cubic yards of sand. Following sand placement, the constructed dune crest was vegetated with Approximately 189,300  native plantings. APTIM developed the post‐construction physical monitoring report and continues to assist regarding  post‐project physical monitoring and biological monitoring support.    City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  37  01C032018D      Before and after the dune repair project at Seagrape Beach (2014 and 2015).  OTHER NOTABLE EFFORTS FOR THE COUNTY:  • Beach Preservation Plan (BPP)  In 2015, APTIM developed an update to the County’s BPP, first adopted in 1988. The BPP details the County’s strategies  for the management and the long‐term sustainability of its coastline. The purpose of this update was to reevaluate the  condition of the County’s coastline and identify cost effective alternatives to maintain and improve its sustainability. To  accomplish this, the following goals were established: 1) avoid adverse impacts to environmental resources including  nearshore hardbottom, 2) assess the vulnerability of upland property up to a 30‐year storm event, 3) quantify the  damages due to shoreline retreat over the next 30 years, and 4) determine the recreational value of the beaches. To  address these goals, APTIM completed several tasks, including updating the beach conditions by evaluating shoreline and  volumetric change data and performing erosion and storm impact analyses. We also held public meetings to explain the  objectives of the update to the BPP and to solicit public input into potential beach management strategies. Management  strategies were developed and analyzed to identify cost effective alternatives to maintain and improve the sustainability  of the County’s beaches. Additionally, APTIM identified potential funding sources and mechanisms to fund these  strategies, for the County’s consideration.  • Post‐Hurricane Matthew FEMA Assistance  APTIM developed storm impact analysis reports for the efforts of securing FEMA Public Assistance disaster relief funding  for the Sector 3 project, as well as the 2.6 miles of Sector 5 and the 2.1 miles of Sector 7. We continue to support the  County with FEMA coordination, as needed.   • Sector 5 Beach Restoration Design and Permitting  APTIM is currently performing design and permitting services for the proposed Sector 5 Beach Restoration Project in the  City of Vero Beach (R‐70 to R‐86). APTIM has developed a project feasibility study and preliminary design for the  ~200,000 cy project. We are currently coordinating with State and Federal permit agencies in an effort to obtain  environmental permits for the project.  25. FIRMS INVOLVED IN THIS PROJECT  a.  (1) Firm Name (2) Firm Location (City and State)  Role  APTIM  Boca Raton, FL  Primary consultant      City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  38  01C032018D    F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  THIS CONTRACT  (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  20. EXAMPLE PROJECT  KEY NUMBER  2  21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  Coquina Beach Nourishment   Manatee County, Florida  PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  2010 ‐ Ongoing  N/A  23. PROJECT OWNER’S INFORMATION  a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  Manatee County  Charlie Hunsicker, Director  941‐742‐5923 x 6001  24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)    Manatee Public Beach (2016), Manatee County, Florida  Program Description:  Since 1989, the staff of APTIM have been the coastal consultant to Manatee County. We have produced and maintained  a comprehensive beach management plan for the County and have continually provided engineering and biological  services for the County’s coastal program, including: project design, geotechnical investigations, environmental studies,  hardbottom monitoring, State and Federal permitting, surveying services, and construction administration required to  build the County’s coastal projects. Our history with Manatee County is an example of our dedication to providing a  wealth of technical and program management services that benefit our clients.   Project Description:  Coquina Beach is located at the south end of Anna Maria Island, a 7.5 mile long barrier island located immediately south  of Tampa Bay. The beach renourishment of Coquina Beach was constructed by Manatee County in March 2014. The  2014 project included the placement of a total of about 332,200 cubic yards of sand along approximately 1.5 miles to  repair damages from Tropical Storm Debby and re‐fill the beach template to full capacity. The sand was obtained from  off of the northern end of Anna Maria Island within the ebb tidal shoal complex of Passage Key Inlet.   The federally authorized Central Beach project area, located immediately north of Coquina Beach, was nourished  between December 2013 and March 2014. Coquina Beach was not a part of the Central Beach Renourishment Program  and did not qualify for Federal funding. In order to renourish Coquina Beach, APTIM worked to "piggy‐back" the Coquina  Beach project onto the Federal project, saving Manatee County millions of dollars in mobilization/demobilization costs to  nourish Coquina Beach.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  39  01C032018D      Coquina Beach (2015).  APTIM provided geotechnical services to identify the sand source, the engineering services, State and FEMA funding  acquisition assistance, permitting services, extensive environmental services, technical consultation and construction  oversight services to help restore this portion of the island’s receding coastline.  APTIM also developed and acquired permits for a seven‐mile‐long underwater pipeline corridor which allowed the  dredging contractor to use the same equipment to deliver sand to both ends of the island. The use of an underwater  pipeline to place sand in Coquina Beach avoided pipeline placement on the beach over almost the entire length of Anna  Maria Island.  APTIM also designed and constructed an approximate 5‐acre mitigative artificial reef approximately 1,100 feet off the  coast of Coquina Beach. APTIM staff worked aggressively on the County's behalf to limit the amount of required artificial  reef as replacement for burial of nearshore hardbottom by the beach nourishment project, again saving Manatee County  construction funds.  OTHER NOTABLE EFFORTS FOR THE COUNTY:  • Federal Coordination and Funding in the City of Anna Maria Island  APTIM assisted Manatee County with proceeding under the authority of Section 206 as the non‐federal sponsor of  construct the federally authorized Central Beach nourishment project. Section 206 allowed Manatee County to engineer  and construct the project, control the design and schedule and reduce engineering and construction costs. APTIM  adapted the construction project to include a 0.6‐mile coastal segment in the City of Anna Maria, which is not part of the  Federal project.   • Emergency Response  We have assisted the Manatee County in securing funds and construction assistance for multiple storm repair projects:  2005 and 2011 projects in response to hurricane activity in 2004 (H. Charlie/Ivan), 2014 project in response to T.S.  Debby, and currently working with the County to obtain FEMA funding associated with the storm damages from  Hurricane Hermine and Hurricane Irma.  • Coastal Structure Removal & Replacement  APTIM is assisting the County with the Cortez Groins Removal and Replacement project, which includes the demolition of  three dilapidated pier‐type structures and replacement with new permeable adjustable groins in order maintain the  stabilization of the shoreline that fronts the island’s evacuation route.  25. FIRMS INVOLVED IN THIS PROJECT  a.  (1) Firm Name (2) Firm Location (City and State)  Role  APTIM  Boca Raton, FL  Primary consultant  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  40  01C032018D    F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  THIS CONTRACT  (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  20. EXAMPLE PROJECT  KEY NUMBER  3  21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  Lido Key Beach Nourishment Program  City of Sarasota, Florida  PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  1989‐present  1998, 2001, 2003, 2009,  2015  23. PROJECT OWNER’S INFORMATION  a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  City of Sarasota  Alexandrea Davis‐Shaw, PE, PTOE  (941) 365‐2200 x 4181  24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)  Since 1989, APTIM’s team of professionals has provided a  full range of engineering, geotechnical, environmental,  coastal modeling, coastal structures design, permitting,  construction assistance, funding acquisition, physical  monitoring and surveying services to the City of Sarasota  resulting in the construction of five beach nourishment  projects on Lido Key, Florida. The City’s beach  preservation program has been highly successful in  restoring and maintaining the popular recreational beach  of Lido Key, providing storm protection to the beach road  (Ben Franklin Drive), and protection to upland structures.   In 2009 and 2015, Lido Key Beach Renourishment  Projects were constructed as FEMA funded projects since  they repaired storm damages to a previously engineered  (non‐federal) beach renourishment project. APTIM  prepared a storm loss analyses in order for the City to obtain FEMA funding associated with the storm damages to the  beach. APTIM assisted the City in applying for time extensions and minor modification to the existing FDEP and USACE  permits, which allowed the project to be constructed with the existing permits. We also provided the City with oversight  and support during construction and assistance with the post‐construction permit requirements. The 2009 project won  the ASBPA Best Restored Beach Award.  An inlet management study developed by APTIM allowed for the use of New Pass ebb shoal as the sediment source.  APTIM conducted Delft3D numerical modeling to determine the coastal effects of excavating sediment from New Pass.   APTIM has also provided in‐kind services that enabled the USACE to re‐establish Lido Key as a federal project and to  develop a federally authorized and funded shore protection project, which will include fill placement and coastal  structures. We are assisting the City with the permitting and coordination for the federal project that will renouish Lido  Key with Big Sarasota Pass as the proposed borrow source. The project includes the construction of two groins at the  south end of the island. The City served as a local sponsor and assisted the USACE by providing engineering,  geotechnical, benthic investigation and permit application services provided by APTIM, including contributions to the  Feasibility Study and project development.  APTIM has assisted the City with post‐Hermine (2016) damage assessments and FEMA coordination to seek funding to  repair damages. APTIM is currently assisting the City with similar services for impacts caused by Hurricane Irma in 2017.  25. FIRMS INVOLVED IN THIS PROJECT  a.  (1) Firm Name (2) Firm Location (City and State)  Role  APTIM  Boca Raton, FL  Primary consultant     Post construction photo Lido Key Beach Renourishment  Project (2015)  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  41  01C032018D    F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  THIS CONTRACT  (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  20. EXAMPLE PROJECT  KEY NUMBER  4  21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  City of Deerfield Beach – Coastal and Waterway Program   City of Deerfield Beach, Florida  PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  2005‐ongoing  Various  23. PROJECT OWNER’S INFORMATION  a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  City of Deerfield Beach  Patrick Bardes   Coastal & Waterway Coordinator  954‐480‐1426  24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)  Project Descriptions:  APTIM has provided various coastal and marine engineering services for the City of Deerfield Beach since 2005 and is  currently assisting the City with the development and implementation of their coastal and waterway program. The City’s  waterfront presents many unique challenges, which require attention during design and permitting to avoid impacts to  the environment while maintaining project intent and benefit. The following provides summaries of current and previous  projects APTIM is implementing or has completed for the City.   Storm Berm Nourishment Project  Since 2016, our team of coastal engineers has been involved with the preliminary design and permitting of a storm berm  nourishment project for the City. The project included topographic beach surveys along the entire City shoreline to  support the preliminary design, which included a varying design template to restore the dune and beach berm. Sand  samples were collected and analyzed by our in‐house geologists. A Coastal Construction Control Line permit was  prepared and submitted to the FDEP. The final permit was recently issued and provides the City with a proactive  mechanism to nourish their shoreline before or after a storm.   Hurricane Irma Pier Repair  APTIM performed a structural engineering assessment of the  International Fishing Pier to evaluate damage sustained during  Hurricane Irma. The assessment included both above and  underwater data collection, which was used to provide  recommendations for repair design. APTIM provided structural  engineering design for the repair of the structure. The project is  currently under construction and APTIM is providing construction  administration services.   Artificial Reef Project  APTIM is currently engaged by the City to design and permit the  construction of a recreational artificial reef in the nearshore of the City offshore of SE 2nd Street. The project is based on  the Artificial Reef Feasibility Study we completed in 2010. The project is partially funded with grants from Florida Sea  Grant. APTIM completed a materials assessment of the existing boulder stockpile in Tivoli Park, completed a stability  analysis to optimize the design, and prepared permit applications for Broward County, FDEP, and the U.S. Army Corps of  Engineers. The project is currently in permitting with construction expected in late 2018.    APTIM performed a topside assessment of hurricane  damage  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  42  01C032018D     Vessel Exclusion Zone  APTIM is providing coastal engineering and permitting services for  a vessel exclusion zone. Services include coordination with the  FDEP and USACE to permit a series of buoys along the City  shoreline to create a safe area for public swimming and  snorkeling. The project is ongoing but will include sediment  probes to determine buoy foundation requirements, engineering  design, and preparation of plans and specifications. Construction  is expected to begin in late 2018.   FEMA Coordination Project  The effects of Hurricane Matthew passing off the coast of Florida  resulted in beach erosion along the City’s shoreline. APTIM  completed a post‐Hurricane Matthew storm damage assessment  using City provided topographic beach profile data. Volume losses  were calculated and documentation was submitted to FEMA.  APTIM obtained a fully executed Project Worksheet (PW) for  future project reimbursement.   2008/2009 Dune Restoration Projects  APTIM designed, permitted, and oversaw construction activities of  2 beach nourishment projects in the City. The 2008 and 2009  projects were constructed to address erosion that occurred  during the 2007 tropical storm season. The projects both qualified  for FEMA funding for restoration and placed 5,100 and 7,300  cubic yards of upland sand, respectively, to restore the eroded  beach. The projects were permitted by the FDEP under the CCCL  program, which restricted the fill placement to above the mean  high water line.   Deerfield Canals Hydrographic Survey  APTIM conducted a hydrographic survey of approximately 3.5  linear miles of 16 canals in the City of Deerfield Beach in 2005.  Approximately five longitudinal transects were surveyed through  each of the 16 canals and depths were collected at approximately  5‐foot intervals. The data was analyzed and presented to the City,  which allowed the City to avoid maintenance dredging and  significant capital expenditure.    25. FIRMS INVOLVED IN THIS PROJECT  a.  (1) Firm Name (2) Firm Location (City and State)  Role  APTIM  Boca Raton, FL  Primary consultant     The 2008/2009 projects were truck‐haul nourishments  and utilized a conveyor system due to limited beach  access  APTIM personnel performing hydrographic survey in the  City of Deerfield Beach canal system  APTIM performed a boulder stockpile assessment in Tivoli  Park  Post‐storm damage assessment  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  43  01C032018D    F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  THIS CONTRACT  (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  20. EXAMPLE PROJECT  KEY NUMBER  5  21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  Curtis Park Boat Ramp Improvements  Miami, Florida  PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  2013‐2017  2017  23. PROJECT OWNER’S INFORMATION  a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  City of Miami  Andre Bryan  305‐416‐1211  24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)  The City of Miami is revitalizing a portion of one of their neighborhoods through improvements to Curtis Park. The City  asked APTIM to design and permit improvements to the boat ramp area with the following components:   Replacement of a decayed wooden dock   Addition of a new center marginal dock to assist in boat launching   Repairs to the existing boat ramp   Replacement of wooden dolphin piles   Replacement of a failed concrete bag revetment with a concrete pile and panel bulkhead   Parking lot expansion and paving to specifically service vehicles with boat trailers   Develop a soil management plan to address historic debris buried onsite   Provide for stormwater treatment for the expanded parking lot  All work was design and permitted to protect the Miami River, which is an Outstanding Florida Water. After surveying the  topography and bathymetry of the site, APTIM obtained permits from the South Florida Water Management District, U.S.  Army Corps of Engineers, and Miami Dade Department of Regulation and Economic Recovery to facilitate the  construction. Construction was completed in 2017. The traffic flow to the ramps and the parking lot was reconfigured to  meet design guidelines. The parking lot was designed to meet the Miami‐Dade County Manatee Protection Plan for the  Miami River, which allowed no net increase in trailer parking within the Park.    25. FIRMS INVOLVED IN THIS PROJECT  a.  (1) Firm Name (2) Firm Location (City and State)  Role  APTIM  Boca Raton, FL  Primary consultant     City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  44  01C032018D    F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  THIS CONTRACT  (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  20. EXAMPLE PROJECT  KEY NUMBER  6  21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  District‐Wide Contamination Assessment, Remediation, and  Environmental Support Services – FDOT 6  PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  2007 ‐ Ongoing    23. PROJECT OWNER’S INFORMATION  a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  Florida Department of Transportation  Mauricio Gomez  District Contamination Impact  Coordinator/Environmental Manager  305‐470‐5228  24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)  APTIM has served FDOT‐6 on this contract for the past two consecutive contract periods since 2007. APTIM is an  extension of the Department on roadway projects ranging from Level I’s and Level II Impact to Construction Assessments  through utility installation and source removals. We have performed UST removals, in situ remediation, source removal  including buried solid waste excavation/ segregation and removal. We have performed permitting and dewatering and  treatment of millions of gallons of groundwater contaminated with Ammonia, in support of FDOT‐6 construction  projects.   APTIM has also become an extension to the Department by providing in‐house consultant support, plan review,  management and regulatory liaison and developing alternate reuse for water and soil produced during construction  activities. This has proved to be financially beneficial to the state and accelerated project timelines throughout the  district. APTIM has completed surveys of bridge structures for asbestos containing materials that are proposed for  renovation or demolition.  State Road 826/836 Interchange, Miami, Florida   The State Road 826/836 Interchange is currently under construction for road improvements in Miami. The improvements  include the installation of drainage structures, construction of ramps, and 49 new bridges.   APTIM continues to provide CAR services as needed during the on‐going construction for the interchange. We were first  tasked during the design phase to evaluate the potential impact to construction. Areas of potential impact were  identified from review of previous environmental documents and a Contamination Screening Memo provided to the  Department. APTIM performed an ICA for more than 20 properties inside the project corridor. APTIM prepared  environmental notes for construction plans.  APTIM conducted source removals resulting in loading, transportation and disposal of approximately 10,000 tons of solid  waste and 1,000 tons of arsenic impacted soil, performed closure assessment for USTs and environmental compliance  oversight and attended weekly construction progress meetings. APTIM successfully implemented a plan for debris  removal from excavated soil and reuse of the arsenic contaminated soil in the project corridor with a saving of over  $800,000 to the Department.  Miami Intermodal Center Avis Rent‐A‐Car, Miami, Florida  APTIM supported the MIC team with plans review for the new tracks and East Concourse construction, permits support  and environmental liaison with the Miami‐Dade Department of Health and DERM. We performed soil and groundwater  assessment in former Avis and Hertz, Rinker and TriRail sites, permitting; UST and AST removal and closure; treatment of  ammonia groundwater and preparation of Solid Waste Removal Plan for upcoming activities at the TriRail Station.  25. FIRMS INVOLVED IN THIS PROJECT  a.  (1) Firm Name (2) Firm Location (City and State)  Role  APTIM  Boca Raton, FL  Primary consultant  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  45  01C032018D    F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  THIS CONTRACT  (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  20. EXAMPLE PROJECT  KEY NUMBER  7  21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  Miami‐Dade DERM  Regulatory and Economic Resources Environmental Cleanup, Compliance  and Related Services  PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  2017‐present  N/A  23. PROJECT OWNER’S INFORMATION  a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER      24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)  Aptim Environmental & Infrastructure, Inc. (APTIM) is currently performing environmental assessment and/or  rehabilitation and related tasks, including, but not limited to, drilling, surveying and mapping, and laboratory analytical  services to Miami Dade County through the Department of Regulatory and Economic Resources Division of  Environmental Resources Management (DERM).  The county contract requires APTIM to provide services related to the modification, repair, removal, replacement,  installation, and/or abandonment of any underground or aboveground storage systems.  APTIM performs services as  design professional and duties related to construction management for environmentally related construction tasks  related to assessment remediation and UST.    Execute work necessary for investigation or prevention of potential or known contamination, for compliance with  applicable regulations, protection of the environment and public health, and for cleanup of environmental  contamination.  All work is performed under the contract at Miami‐Dade County owned or operated sites in accordance  with Chapter 62‐780 of the Florida Administrative Code (FAG), Chapter 24 of the Miami‐Dade County Code, and all other  applicable regulations.  Aptim has supplied services to the Miami Dade County Parks and Recreation, Division of Libraries, Water and Sewer,  Public Housing, Fire Rescue, Rea Estate Development Division and Aviation Departments under this contract.  25. FIRMS INVOLVED IN THIS PROJECT  a.  (1) Firm Name (2) Firm Location (City and State)  Role  APTIM  Boca Raton, FL  Primary consultant       City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  46  01C032018D    F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  THIS CONTRACT  (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  20. EXAMPLE PROJECT  KEY NUMBER  8  21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  Captiva and Sanibel Islands Beach Nourishment Projects  Lee County, Florida  PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  1988‐Ongoing  1988/89, 1996, 2006,  2008, 2013  23. PROJECT OWNER’S INFORMATION  a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  Captiva Erosion Prevention District (CEPD)  Kathleen Rooker,   Administrator ‐ CEPD  (239) 472‐2472  24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)  APTIM has provided our comprehensive services to CEPD since 1988, including: coastal zone planning, permitting,  engineering design, studies and design, coastal modeling, geotechnical, storm response efforts, construction assistance,  biological and physical monitoring, funding applications, geographical information system (GIS) and CAD services, survey  and mapping. Our history with the District is an example of our dedication to providing a wealth of technical and program  management services that benefit our clients.  APTIM designed, permitted, and supervised the construction of the beach renourishment projects for Captiva and  Sanibel Islands. APTIM conducted the initial project feasibility study. APTIM also assisted with General Design  Memorandum (GDM), which qualified the project for Federal reimbursement, amended and updated the project GDM  for continued Federal funding, and provided benefit calculations for the Captiva Erosion Prevention District’s (CEPD)  apportionments. APTIM developed the initial inlet management study in 1995 and is currently assisting with the inlet  management study update. APTIM has assisted the District in securing FEMA funding assistance for multiple storm repair  projects. In addition to beach nourishment, APTIM designed, permitted and supervised construction of the rehabilitation  of the Redfish Pass terminal groin to improve sand retention on the island, which was partially funded by FEMA.   The CEPD constructed the 2013 project locally, placing 740,000 cy of fill on Captiva Island and 75,000 cy of fill on Sanibel  Island to replace storm damages from Tropical Storm Debby, and refilled the template to its full capacity. APTIM assisted  CEPD with development of an expanded borrow area, construction plans, and specifications for the 2013 Captiva and  Sanibel Islands Project. APTIM performed on site construction observations for the District and represented CEPD during  the construction process. APTIM also developed a dune restoration and vegetation plan in conjunction with the  renourishment project. APTIM is currently assisting the District with the post‐Irma assessment to seek FEMA  reimbursement to repair storm damages to the project area.  In 2014/15, APTIM prepared and submitted a 15‐Year multi‐use expedited permit application for repeat projects to the  FDEP and USACE. This permit application allows for flexible management and response to major storms, hot spots, or  routine maintenance. These permits allow flexibility to address a range of project needs.      25. FIRMS INVOLVED IN THIS PROJECT  a.  (1) Firm Name (2) Firm Location (City and State)  Role  APTIM  Boca Raton, FL  Primary consultant     Post construction photo of the completed 2013  Renourishment, Captiva Island Beach  Construction photo during the 2013 Captiva  Island Beach  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  47  01C032018D      F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  THIS CONTRACT  (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  20. EXAMPLE PROJECT KEY  NUMBER  9  21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  Delray Beach Nourishment Program   Delray Beach, Florida  PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  1978‐ongoing  1978, 1984, 1992, 2002 and 2013  23. PROJECT OWNER’S INFORMATION  a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  City of Delray Beach  Bob Diaz  561‐243‐7343  24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)  Since 1973, the City of Delray Beach has made major strides in restoring their eroded beach. Once at risk to being overtaken  by the ocean, highway A1A and its neighboring properties have been protected by the wide beach. The beach of Delray Beach  is known through the United States as a wonderful beach experience destination and an important economic asset to the City  and State.   To date, the City of Delray Beach (the City) has participated in eight beach nourishment projects. Approximately 7.9 million  cubic yards of sand from offshore borrow areas have been placed as a result of the City's beach preservation efforts. Since the  initial nourishment of 1973, the City has maintained the beach through planned, periodic beach renourishment on five  occasions, including 1978, 1984, 1992, 2002 and 2013. Storm damage repair projects were constructed in 2005 and 2014 by  the U.S. Army Corps of Engineers (USACE) in response to losses from the active 2004 hurricane season and 2012’s Hurricane  Sandy. Since the initial restoration in 1973, the project area retains approximately 5.1 million cubic yards of beach compatible  material, which is 64% of the total volume placed. The retention of material within the project area has continually improved,  without significantly changing renourishment volumes of individual projects.     Delray Beach after the 2013 truck Haul dune repair project (2013).  The Fifth Periodic Beach Renourishment Project was constructed in March and April 2013 and included the placement of  approximately 1,158,500 cubic yards of sediment along the 1.9‐mile project area in Delray Beach. The project reestablished  the federally authorized project, based on the most recent federal design document, the 2001 Limited Reevaluation Report.  The project also replaced losses caused by Hurricane Sandy in October 2012.  APTIM engineers provided all of the engineering services required for each project since 1978, including project design,  geotechnical  investigations,  environmental  studies,  State  and  Federal  permitting,  surveying  services  and  construction  oversight required to build each project. The beach at Delray Beach won the “Best Restored Beach” award in 2002, and the  American Shore and Beach Protection Association’s “Best Beach” award in 2005 and 2013.   Emergency Dune Repair  After the passage of Hurricane Sandy off the coast of Florida, the northern end of Delray Beach in Palm Beach County was  riddled with dune scarping. This northern area had historically been stable and was therefore not included in the upcoming  2013 Fifth Periodic Beach Renourishment. To quickly address this need, the City of Delray Beach worked with APTIM to obtain  an FDEP field permit for a truck haul sand placement project. APTIM also investigated a permit modification that would allow  dredged sand to be stock piled during the upcoming periodic beach nourishment and then transported up the beach to the  northern end.   APTIM surveyors conducted pre‐ and post‐construction beach surveys of the impacted area. APTIM engineers coordinated  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  48  01C032018D    with agencies, designed and calculated volumes of the dune fill templates, and produced a set of construction plan drawings  on an expedited schedule.  The truck haul project was constructed over three days in February of 2013. Approximately 2,500 cy of sand were hauled from  E.R. Jahna’s Ortona sand mine and delivered to the northernmost public access at Delray Beach. Eastman Aggregates, Inc.  placed the sand on the dry beach and graded it into sloping dunes along 970 linear feet of beach between R‐176 and R‐177.   Delray Beach before and after construction (2013).  During construction, APTIM engineers provided continuous construction oversight. The on‐site observer constantly monitored  sediment quality and verified that fill placement met the design template. APTIM collected weight tickets and tracked  delivered quantities for payment. During demobilization, APTIM engineers were able to ensure that the contractor returned  the access and staging area to its original condition.  25. FIRMS INVOLVED IN THIS PROJECT  a.  (1) Firm Name (2) Firm Location (City and State)  Role  APTIM  Boca Raton, FL  Primary consultant     City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  49  01C032018D    F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  THIS CONTRACT  (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  20. EXAMPLE PROJECT  KEY NUMBER  10  21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  Summary Planning Document for the Pinellas County Coastal Management  Program, Pinellas County, Florida  PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  2011‐2013  N/A  23. PROJECT OWNER’S INFORMATION  a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  Pinellas County  Andrew Squires,   Coastal Management  (727) 464‐4633  24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)  APTIM has recently assisted Pinellas County with the development of a comprehensive Summary Planning Document for  the Pinellas County Coastal Management Program (CMP). This document defines aspects of the CMP, producing a  comprehensive, “Go To” document that maintains all relevant CMP information in one location. This document is  intended to be a “living” document, meaning it will be updated on a regular basis to reflect changes to the CMP. Specific  components of the Summary Planning Document are described below:  Section 1 presents a detailed description of the CMP from both a historical and current operations standpoint. This  includes a description of the CMP history, current funding mechanisms, operations, recent significant storm events, and  stakeholders and partners.  Section 2 describes in detail all of the historical and current Federal project authorizations within the CMP. It covers the  authorization legislation and documents, past and current federal projects, and any other aspects related to federally  authorized coastal project within Pinellas County.  Section 3 contains detailed descriptions of the CMP elements, including Anclote Key, Three Rooker Bar, Honeymoon  Island, Caladesi Island, Clearwater Beach Island, Sand Key, Treasure Island, Long Key, Shell Key, Bunces Key, Mullet Key,  Hurricane Pass, Clearwater Pass, John’s Pass, Blind Pass, North Channel (Pass‐A‐Grille Pass), South Channel (Pass‐A‐Grille  Pass), Bunces Pass, offshore sediment borrow areas and artificial reefs.  Section 4 contains a CMP needs analysis and schedule for future activities for each of the CMP program elements  described in Section 3. This includes funding needs for the next six years (FY2012‐2017) and long‐term planning  milestones through FY 2021.  Section 5 describes the coastal management programs of three other coastal communities to provide information to the  Pinellas County CMP from a comparative operational standpoint. The other programs described include Manatee  County, Bay County, and Collier County.  Section 6 outlines three possible CMP management strategies for the County with future planning recommendations.  Section 7 contains final recommendations for the CMP moving forward. APTIM recommended that Pinellas County  pursue a hybrid management strategy incorporating coordination and cooperation with Federal and State agencies with  the flexibility to transition to a more financially self‐reliant program aided by consultants and in house staff.    25. FIRMS INVOLVED IN THIS PROJECT T  a.  (1) Firm Name (2) Firm Location (City and State)  Role  APTIM  Boca Raton, FL  Primary consultant     01C032018D G: KEY PERSONNEL VS. PROJECTS City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  50  01C032018D    G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS  26. NAMES OF KEY PERSONNEL  (From Section E, Block 12)  27. ROLE IN THIS CONTRACT  (From Section E, Block 13)  28. EXAMPLE PROJECTS LISTED IN SECTION F  (Fill in “Example Projects Key” section below  before completing table. Place “X” under project  key number for participation in same or similar  role.)  1 2 3 4 5 6 7 8 9 10  Thomas Pierro, PE, D.CE.  Director of Operations, QA/QC             Jordon Cheifet, PE Project Manager            Beau Suthard, PG  Geology            Beth Forrest, PhD, PG Geology            Kristina McCoy, PG  Geology            Douglas Mann, PE, D.CE. Coastal & Marine Engineering            David Swigler, PE  Coastal & Marine Engineering            William Reilly, PE Coastal & Marine Engineering            João Dobrochinski, MS  Numerical Modeling             Zhifei Dong, PhD Numerical Modeling            Stacy Buck, MS  Environmental Monitoring            Lauren Floyd, MS Environmental Monitoring            Katy Brown, MS  Environmental Monitoring            Neil Campbell, PG Environmental Engineering            Joshua Blanco, CHMM  Environmental Engineering            Jason Whitman, PG Environmental Engineering            Jeffrey Andrews, PSM  Surveying            Michael Lowiec, PSM Surveying            Jason Walker  Surveying            Angela Belden GIS/CAD            Heather Vollmer, GISP  GIS/CAD            Gary Krystyniak GIS/CAD            29. EXAMPLE PROJECTS KEY  NO. Title of Example Project (From Section F) NO. Title of Example Project (From Section F)  1 Indian River County Sector 3 Dune Repair Project,   Indian River County, Florida 6 FDOT   2 Coquina Beach Nourishment, Manatee County, Florida 7 DERM   3 City of Deerfield Beach Coastal Waterway Program, City  of Deerfield Beach, Florida  8 Captiva and Sanibel Islands Beach Nourishment  Projects, Lee County, Florida  4 Lido Key Beach Nourishment Program City of Sarasota,  Florida  9 City of Delray Beach,   City of Delray Beach, Florida   5 Curtis Park City of Miami, Florida  10 Pinellas County Summary Document,   Pinellas County, Florida     01C032018D H-I: ADDITIONAL INFORMATION AND SIGNATURE City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  51  01C032018D    H. ADDITIONAL INFORMATION  30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED.  Coastal Resiliency Planning  APTIM is perfectly suited for climate change vulnerability assessments and planning due to our specialized experience  with database management, GIS, modeling, engineering, planning, outreach and project management. We have several  resiliency projects under our belt and would welcome the opportunity to assist the City of Sunny Isles Beach in  developing adaptation plans that are clear, concise and defensible based on our documented quantifications and digital  procedures.  Resiliency  Although the “resiliency” term has become popular only in recent years, APTIM has been on the front lines of resiliency  since 1984. Our initial projects revolved around constructing beach nourishment projects that mitigated the effects of  coastal destruction caused by sea level rise and tropical storms. In order to design the best beaches and coastal  structures, we have built a team of experts that understand coastal process and the drivers for climate change. Our  experts specialize in sea level rise, storm surge, oceanography, sediment transport, remote sensing, and GIS to name a  few. With a company filled with a diverse set of skills that apply to all facets of coastal change, there was a natural  expansion of services to our clients that include scientific studies that focus on climate change.  We recently completed the Texas Coastal Resiliency project, which compiled and cataloged more than 900 reports that  addressed topics that ranged from emergency response plans to environmental to specific disaster information. An  expansive geodatabase with over 3,000 potentially affected systems were compiled and ranked based on their risk to  climate change.  In 2013, we completed a sustainability master plan for the City of Palm Bay, Florida. The plan focused on the  sustainability of the environment, economy and social equity to support a green economy that reduces energy  consumption and greenhouse gas emission while optimizing service quality to the community. The project involved  energy audits and quantifications of energy use and greenhouse gas emissions from facilities, data centers, vehicles,  transportation infrastructure and park facilities. We also worked with the City to develop sustainable land use policies  and codes for construction.  APTIM has continued to assist the City of New York with preparations of a resiliency vision document along with  housing lighting and energy assessments. The vision document entitled Recover to Resiliency provides a roadmap for  choices, commitments and actions to guide the rebuilding efforts following Hurricane Sandy so that the City’s actions  will pay dividends for the residents and the environment for years to come.  We surveyed 26 sites, 229 buildings and more than 600 apartment units to help the City formulate a plan and obtain  funding to upgrade lighting fixtures at all Housing Authority owned properties. The upgraded lighting will not only  reduce energy consumption but also increase light quality to make sites safer and more inviting for residents and  visitors.  GIS  The GIS team based out of Boca Raton, Florida is responsible for providing a wide range of information management  services and product support to all of our offices. These services include GIS design and deployment, database design,  web server applications, document and record management, mobile data collection support, map development, GIS  training and user manual creation. Our team is experienced with the suite of ESRI’s GIS products and supporting  software applications including Python, Oracle, MS SQL, Javascript API, Visual Studio, Silverlight, FLEX, SDE, .NET, Access  and Microsoft sync technology for wireless field synchronization.    City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  52  01C032018D      Texas Coastal Resiliency Study limits    SLOSH model results in Massachusetts  The Texas Resiliency project contained more than 3,000 datasets that were compiled into a single geodatabase. APTIM  developed a method to combine multiple hazards that allowed for quantification of vulnerability for each system. We  pushed the data online so that stakeholders can view the data and analyze the results. We developed custom tools that  produced reports for each identified system that was susceptible to climate change and those reports could be printed  by the stakeholders to assist with their planning duties.  APTIM has been assisting the US Army Corps of Engineers (USACE) with their LiDAR and regional sediment management  (RSM) programs. For the LiDAR projects, we developed custom tools using Python within ArcGIS that extract metrics like  shorelines and quantifies volume change which provides coastal managers with accurate data for coastal management  planning. For RSM, we use Python to generate custom tools that ingest various USACE datasets to produce a national  summary that indicates how sediments are being disposed for all of their inlet dredging projects. The RSM database is  pushed online so that USACE District managers can review the results and provide additional information to improve  the geodatabase.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  53  01C032018D    Modeling Applications  In order to fully understand how to apply modeling products to a climate change vulnerability assessment, it is  important to understand how to run and interpret the models that are producing the results. We have a dedicated  team at APTIM that runs a wide range of coastal models for many of our clients. Our modeling projects are developed  by a team of experienced physical oceanographers and coastal engineers who are strongly grounded in coastal process  theory and applications. In addition to SLOSH, APTIM also owns and operates Delft3D, MIKE21, Bouss2D, STWAVE,  ADCIRC, GENESIS, UNIBEST CL+, DNRBS, SBEACH, and the BEACH‐fx economic storm damage model.  APTIM recently completed running the SLOSH model for the EPA who was concerned about how climate change will  affect the water supply for the Mattapoisett area of southern Massachusetts. Four different SLR scenarios and three  different climate conditions were considered that produced more than 400 modeling runs. The SLOSH results were  then applied to the HEC‐RAS model to predict how quickly the water supply would flush seawater should the dam  protecting the water supply be overtopped.  Sustainability  APTIM strives not only to reach sustainability goals, but to exceed them by investing in the research and development  required to find new and innovative technologies that will set us apart from other firms, and benefit our clients.  APTIM encourages its employees to engage in community based sustainability initiatives such as the City of Chicago's  Green Office Challenge and Austin, Texas Green Business Leaders program. The Challenge and Green Business Leaders  are city‐wide programs that target businesses, non‐profits and government agencies to reduce their carbon emissions  and environmental footprint, as a key element of city climate action and sustainability plans. We consistently receive  the highest level of recognition in these programs.  APTIM incorporates green and sustainable activities into numerous areas within the organization, including integrating  sustainable design into its facilities such as LEED Gold and Silver spaces, and encourages sustainable practices at the  office level. Practices include bike parking and changing facilities, transit subsidies, alternative transportation, on‐site  composting, telecommuting, car‐sharing, emission offsets for rental vehicles, community supported agriculture, water  conservation, the regular purchase of renewable energy credits (RECs) and volunteer technical assistance to community  energy and sustainability projects.   APTIM is institutionalizing best practices by achieving ISO certification in the Madison, WI office. The best practices  from that successful pilot will be replicated in other APTIM offices.  Implementation is supported and coordinated by a number of sustainability and energy experts throughout the  company. APTIM supports the governance of this program within the existing management structure already set for its  current operations.  Internally, APTIM recently performed a sustainability and energy usage analysis of its own portfolio of buildings to  identify the top energy using locations. Based on this assessment, APTIM has performed internal energy audits of its top  seven facilities. The goal of these assessments is to find both low‐cost and capital improvement projects available to  reduce our energy usage and carbon footprint. These audits identified an average potential energy reduction of 10% to  13% across APTIM’s entire owned and operated facilities.  Based on our national energy spend, APTIM projects a potential cost effective annual energy savings potential of $1.2M.  This is based on implementation of a national energy reduction strategy applying low‐cost and capital improvement  energy efficiency projects. This equates to an approximate annual reduction of 11,300,000 kWh, 156,000 Therms, and  8,500 metric tons of CO2. APTIM is committed to investing time and resources to be the world’s leading sustainability  solutions‐based company that assesses, develops, implements, maintains, and operates environmental programs that  contribute to our clients’ sustainability goals and targets.  Reporting  Well‐written documentation is an essential element of our communication system. APTIM has over 30 years of  experience preparing all types of reports and documents for our Florida clients. This experience enables us to develop  reporting formats that provide clear, concise data for review and approval by the City.  01C032018D S F 3 3 0 P A R T I I SF 330 PART II BRYNTESEN STRUCTURAL ENGINEERS CURRIE SOWARDS AGUILA ARCHITECTS AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 1 MANDATORY USE DATE OF FORM 6/2004 ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT -SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) City of Sunny Isles Marine and Coastal Professional Engineering Consulting Services 2. PUBLIC NOTICE DATE March 12, 2018 3. SOLICITATION OR PROJECT NUMBER 18-02-01 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Jess Sowards, AIA, LEED AP - Principal 5. NAME OF FIRM Currie Sowards Aguila Architects, Inc. 6. TELEPHONE NUMBER 561-276-4951 7. FAX NUMBER 561-243-8184 8. E-MAIL ADDRESS jess@csa-architects.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PR I M E J -V PA RT N E R SU B C O N - TR A C T O R a. Currie Sowards Aguila Architects, Inc. 185 NE 4th Avenue, Suite 101 Delray Beach, Florida 33483 Architectural Design and Construction Administration Services CHECK IF BRANCH OFFICE b. CHECK IF BRANCH OFFICE c. CHECK IF BRANCH OFFICE d. CHECK IF BRANCH OFFICE e. CHECK IF BRANCH OFFICE f. CHECK IF BRANCH OFFICE AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 2 MANDATORY USE DATE OF FORM 6/2004 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jess M. Sowards, AIA, LEED AP 13. ROLE IN THIS CONTRACT Principal Manager 14. YEARS EXPERIENCE a. TOTAL 32 b. WITH CURRENT FIRM 31 15. FIRM NAME AND LOCATION (City and State) Currie Sowards Aguila Architects, Inc. 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Architecture, University of Kentucky 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida / Architecture / #13205 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) National Council of Architectural Registration Boards (NCARB) – Certificate #57881 U.S. Green Building Council – LEED Accredited Professional Member, Boca Raton Community Appearance Board 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Palm Beach State College Campus Green Palm Beach Gardens, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jess was the principal in charge and design architect for this the project architect outdoor amphitheater. The space serves as a venue for concerts, lectures and events. b. (1) TITLE AND LOCATION (City and State) Bluesten Park Community Center Hallandale Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jess is the Principal Designer for this 45,000 community center. The modern civic wellness center will include rooms for high and low impact exercise, weightlifting and strength training, a spin ro om and a large interior gymnasium with bleachers. A large component of any modern gym, rooms for child care and youth activities have been provided for three different age groups: young children, youth and teen. Additionally, a large recreational pool with eight 75 foot competition lap lanes, waist high swim area and a zero entry is provided alongside a children’s water activity pool. c. (1) TITLE AND LOCATION (City and State) Flagler Memorial Bridge Design Criteria West Palm Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jess led the architectural design for this bascule bridge. The completed bridge serves as the replacement for a 1938 structure and spans 2,400 feet over the Intracoastal Waterway. Working in collaboration with the lead engineering consultant, CSAA provided architectural design services to FDOT for a PD&E study. Under Jess’s direction, the firm met with the community to determine location of new bridge, height and the architectural style of the bridge. The team then developed a criteria package for a design build project delivery. d. (1) TITLE AND LOCATION (City and State) Pier Municipal Garage Pompano Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jess served as the Principal Designer for this oceanfront parking structure. Delivered through a Design/Build contract, CSAA’s services included design, construction documents and permitting for this oceanfront parking structure. Delight and wonder was the design intent, providing 662 new parking spaces in a mixed use garage of 239,400 square feet. AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 5 MANDATORY USE DATE OF FORM 6/2004 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) Pier Municipal Garage Pompano Beach, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2016 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Pompano Beach b. POINT OF CONTACT NAME Horacio Danovich, CIP Project Manager c. POINT OF CONTACT TELEPHONE NUMBER (954)786-7834 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Delivered through a Design/Build contract, this project included design, construction documents and permitting for this oceanfront parking structure. Delight and wonder was the design intent, providing some 662 new parking spaces in a mixed use garage of 239,400 square feet. The building base undulation reinforces the thematic movement of wind and water. Program elements include more than parking: retai l space, a tourism office, a welcome center, and a storage area for lifeguard operations. The design expresses an intention architects strive for—a building with a true sense of place. Permitting agencies included: Broward County and the Florida Department of Environmental Protection. Project Cost: $20,000,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Currie Sowards Aguila Architects, Inc. (2) FIRM LOCATION (City and State) Delray Beach, Florida (3) ROLE Complete architectural services through construction administration b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 8 MANDATORY USE DATE OF FORM 6/2004 ARCHITECT ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) 18-02-01 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Currie Sowards Aguila Architects 3. YEAR ESTABLISHED 1969 4. DUNS NUMBER 10-194-2365 2b. STREET 185 NE 4th Avenue, Suite 101 5. OWNERSHIP a. TYPE Corporation 2c. CITY Delray Beach 2d. STATE FL 2e. ZIP CODE 33483 b. SMALL BUSINESS STATUS Certified Small Business, Palm Beach County 6a. POINT OF CONTACT NAME AND TITLE Jess Sowards AIA, LEED AP - Principal 7. NAME OF FIRM (If block 2a is a branch office) 6b. TELEPHONE NUMBER 561-276-4951 6c. E-MAIL ADDRESS jess@csa-architects.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER Robert G. Currie Partnership, Inc. Currie Stubbins & Schneider, PA Robert G. Currie & Associates 1992 1985 1969 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 02 Administrative 2 H11 Housing/Multifamily/Townhouses 2 06 Architect 6 C11 Community Facilities 3 08 CADD Technician 6 C15 Construction Management 1 P13 Public Safety Facilities 3 A11 Auditoriums/Theaters 2 G01 Garages/Vehicle Maint. Facilities 2 I05 Interior Design/Space planning 1 O01 Office Buildings/Industrial Parks 2 P06 Planning/Site, Installation/Project 2 R06 Rehabilitation/Buildings/Structures 1 Other Employees Total 14 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000. 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 0 b. Non-Federal Work 5 c. Total Work 5 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. SIGNATURE . NAME AND TITLE: Jess Sowards, AIA, LEED AP - Principal b. DATE March 6, 2018 Currie Sowards 5-Year Project History Project Client Address Start End Scope Bluesten Park Hallandale Beach 501 SE 1 Avenue, Hallandale Beach, FL 33309 September 2015 February 2019 Design Pompano Beach Fire Station 103 City of Pompano Beach 1201 NE 5 Avenue Pompano Beach, FL 33060 August 2011 March 2016 Design, bid and permit document and CA Pompano Beach Parking Garage City of Pompano Beach Community Redevelopment Agency Pier Street, Pompano Beach July 2011 June 2016 Design and construction documents through Design-Build Delivery HP CONSULTANTS, INC. 5. NAME OF FIRM PART I - CONTRACT-SPECIFIC QUALIFICATIONS ARCHITECT - ENGINEER QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER B. ARCHITECT-ENGINEER POINT OF CONTACT C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) 4. NAME AND TITLE 8. E-MAIL ADDRESS7. FAX NUMBER6. TELEPHONE NUMBER (Check) PR I M E J- V PA R T N E R SU B C O N - TR A C T O R 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT a. b. c. d. e. f. STANDARD FORM 330 (6/2004) PAGE 1 D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE AUTHORIZED FOR LOCAL REPRODUCTION 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)16. EDUCATION (DEGREE AND SPECIALIZATION) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (6/2004) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm TITLE OF EXAMPLE PROJECT (FROM SECTION F) G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 1 2 3 4 5 6 7 8 9 10 STANDARD FORM 330 (6/2004) PAGE 4 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13)1 2 3 4 5 6 7 8 9 10 29. EXAMPLE PROJECTS KEY NO.TITLE OF EXAMPLE PROJECT (FROM SECTION F)NO. 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) LEITER, PEREZ & ASSOCIATES, INC. X 01C032018D F . F I R M R E F E R E N C E S A N D S I M I L A R W O R K C O M P L E T E D F. FIRM REFERENCES AND SIMILAR WORK COMPLETED City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  36  01C032018D    F. FIRM REFERENCES AND SIMILAR WORK COMPLETED  For over 30 years, APTIM has been providing coastal Florida communities with a complete spectrum of  comprehensive marine and coastal engineering services. APTIM’s extensive project experience makes us  uniquely and exceedingly qualified to meet the City’s needs under this contract. As evidence of our  qualifications, this section provides detailed descriptions for four (4) of our recent projects similar in scope  to the services detailed in the City’s RFQ. We have also included completed reference forms for each of  these projects, where our clients attest to APTIM’s consistently high standard of work. Six (6) additional  projects are highlighted in Section E of our SF330.     The following four (4) projects and client references are presented to demonstrate APTIM’s recent  experience as it specifically relates to the scope of services requested in this RFQ:    Indian River County ‐ Sector 3 Dune Repair Project   Manatee County ‐ Coquina Beach Nourishment Project   City of Deerfield Beach ‐ Coastal and Waterway Program   City of Sarasota ‐ Lido Key Beach Nourishment Program      City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  37  01C032018D    Sector 3 Dune Repair Project  INDIAN RIVER COUNTY, FLORIDA  Program Description:  Since 2013, the APTIM staff have been providing quality coastal  engineering consulting services to Indian River County. During this  time, we have successfully implemented major beach management  initiatives for the County. Our team has unequaled direct project  experience on recent Indian River County beach restoration  projects. This experience includes beach management, feasibility  studies, design, engineering, permitting, construction management,  biological support services, physical monitoring, grant writing  assistance, and post‐storm assessments.  The initial Sector 3 Beach and Dune Restoration Project was  completed in three phases between 2010 and 2012. The initial  project was 6.6 miles long and spanned from R‐20 to R‐55. Following  completion of the initial project, the effects of Hurricane Sandy  passing off the coast of Florida in October 2012 resulted in  significant dune erosion to the project area. APTIM designed,  permitted, managed construction, and currently monitors the  Sector 3 Dune Repair Project, constructed in the winter of 2014/15.  Instead of obtaining a new permit to address the damages, APTIM  was able to obtain an FDEP permit modification for a one‐time truck  haul sand placement project to quickly address this need. There was  tremendous savings of time and money for the County to have the  repair project implemented this way.   APTIM developed a feasibility study to specifically address the  damages that occurred from Hurricane Sandy. The renourishment  project was to have “no impact” to the nearshore hardbottom  communities fronting the project area. The final project design  entailed a modest dune feature and planting of dune vegetation  from Treasure Shores Beach Park south to northern John’s Island (R‐ Client  Indian River County, Florida  Client Contact  James Gray, Coastal Coordinator  1801 27th Street, Building A  Vero Beach, FL 32960  P: (772) 226‐1344  F:  (772) 778‐9391  jgray@ircgov.com  Project Date  Completed: 2015; coastal program  services ongoing  APTIM Staff  Tom Pierro – program manager,  senior coastal engineering  Michelle Pfeiffer – project manager,  coastal engineering  Will Reilly – assistant project manager  coastal engineering  Stacy Buck – lead marine biologist,  permitting and NEPA lead  Lauren Floyd – senior marine  biologist, UMAM review  Beau Suthard – geotechnical analysis  of proposed borrow area   Quin Robertson – geotechnical  analysis of proposed borrow area  samples  Heather Vollmer – GIS mapping   Gary Krystyniak – CAD drafting  Ecological Associates – sea turtle  monitoring services  GPI Geospatial, Inc. – aerial  photography sub‐consultant      Indian River County following construction of the Sector 3 Dune Repair  Project (2015).  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  38  01C032018D    24 to R‐55). All construction activities occurred seaward  of the existing dune vegetation line and above the Mean  High Water Line (MHWL).   Sand for the construction was obtained from two  upland sand sources, Blue Goose Mine (f.k.a. Hammond  Mine) and Davis Mine, and transported to the project  site via truck haul method. In total, the project placed  approximately 173,068 cubic yards of sand. Following  sand placement, the constructed dune crest was  vegetated with Approximately 189,300 native plantings.  APTIM developed the post‐construction physical  monitoring report and continues to assist regarding  post‐project physical monitoring and biological  monitoring support.  OTHER NOTABLE EFFORTS FOR THE  COUNTY:  Beach Preservation Plan (BPP)  In 2015, APTIM developed an update to the County’s  BPP, first adopted in 1988. The BPP details the County’s  strategies for the management and the long‐term  sustainability of its coastline. The purpose of this update  was to reevaluate the condition of the County’s  coastline and identify cost effective alternatives to  maintain and improve its sustainability. To accomplish  this, the following goals were established: 1) avoid adverse impacts to environmental resources including  nearshore hardbottom, 2) assess the vulnerability of upland property up to a 30‐year storm event, 3)  quantify the damages due to shoreline retreat over the next 30 years, and 4) determine the recreational  value of the beaches. To address these goals, APTIM completed several tasks, including updating the beach  conditions by evaluating shoreline and volumetric change data and performing erosion and storm impact  analyses. We also held public meetings to explain the objectives of the update to the BPP and to solicit  public input into potential beach management strategies. Management strategies were developed and  analyzed to identify cost effective alternatives to maintain and improve the sustainability of the County’s  beaches. Additionally, APTIM identified potential funding sources and mechanisms to fund these strategies,  for the County’s consideration.  Post‐Hurricane Matthew FEMA Assistance  APTIM developed storm impact analysis reports for the efforts of securing FEMA Public Assistance  disaster relief funding for the Sector 3 project, as well as the 2.6 miles of Sector 5 and the 2.1 miles of  Sector 7. We continue to support the County with FEMA coordination, as needed.   Sector 5 Beach Restoration Design and Permitting  APTIM is currently performing design and permitting services for the proposed Sector 5 Beach  Restoration Project in the City of Vero Beach (R‐70 to R‐86). APTIM has developed a project feasibility  study and preliminary design for the ~200,000 cy project. We are currently coordinating with State and  Federal permit agencies in an effort to obtain environmental permits for the project.        Before and after the dune repair project at   Seagrape Beach (2014 and 2015).  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  39  01C032018D    Coquina Beach Nourishment Project  MANATEE COUNTY, FLORIDA  Program Description:  Since 1989, the staff of APTIM have been the coastal consultant to  Manatee County. We have produced and maintained a  comprehensive beach management plan for the County and have  continually provided engineering and biological services for the  County’s coastal program, including: project design, geotechnical  investigations, environmental studies, hardbottom monitoring,  State and Federal permitting, surveying services, physical  monitoring, and construction administration required to build the  County’s coastal projects. Our history with Manatee County is an  example of our dedication to providing a wealth of technical and  program management services that benefit our clients.   Coquina Beach is located at the south end of Anna Maria Island, a  7.5 mile long barrier island located immediately south of Tampa  Bay. The beach renourishment of Coquina Beach was constructed  by Manatee County in March 2014. The 2014 project included the  placement of a total of about 332,200 cubic yards of sand along  approximately 1.5 miles to repair damages from Tropical Storm  Debby and re‐fill the beach template to full capacity. The sand was  obtained from within the ebb tidal shoal complex of Passage Key  Inlet off of the northern end of Anna Maria Island.   The federally authorized Central Beach project area, located  immediately north of Coquina Beach, was nourished between  December 2013 and March 2014. Coquina Beach was not a part of  the Central Beach Renourishment Program and therefore does not  qualify for Federal funding. In order to renourish Coquina Beach,  Client  Manatee County, Florida  Client Contact  Charlie Hunsicker, Director  Parks & Natural Resources Dept.  Manatee County Government  5502 33rd Ave. Dr. West  Bradenton, FL 34209  P: (941) 742‐5923, ext. 6001  F:  (941) 742‐5972  charlie.hunsicker@mymanatee.org  Project Date  Completed: 2014; coastal program  services ongoing    APTIM Staff  Tom Pierro – director and senior  coastal engineer  Michelle Pfeiffer – project manager  and engineer of record  Will Reilly – post‐storm coastal  engineering assistance  Lauren Floyd – lead senior marine  biologist, permitting and NEPA lead  Stacy Buck – senior marine biologist  Kathryn Brown – marine biologist  Beth Forrest – geologist  Beau Suthard – geologist  Erica Carr‐Betts – engineer and  funding request assistance      Manatee Public Beach (2016).  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  40  01C032018D    APTIM worked to "piggy‐back" the Coquina Beach project  onto the Federal project, saving Manatee County millions  of dollars in mobilization/demobilization costs to nourish  Coquina Beach. APTIM provided geotechnical services to identify the  sand source, the engineering services, State and FEMA  funding acquisition assistance, permitting services,  extensive environmental services, technical consultation  and construction oversight services to help restore this  portion of the island’s receding coastline.  APTIM also developed and acquired permits for a seven‐ mile‐long underwater pipeline corridor which allowed  the dredging contractor to use the same equipment to  deliver sand to both ends of the island. The use of an  underwater pipeline to place sand in Coquina Beach avoided pipeline placement on the beach over  almost the entire length of Anna Maria Island.  APTIM also designed and constructed an approximate 5‐acre mitigative artificial reef approximately 1,100  feet off the coast of Coquina Beach. APTIM staff worked aggressively on the County's behalf to limit the  amount of required artificial reef as replacement for burial of nearshore hardbottom by the beach  nourishment project, again saving Manatee County construction funds.  Other notable efforts for the county:  Federal Coordination and Funding in the City of Anna Maria Island  APTIM assisted Manatee County with proceeding under the authority of Section 206 as the non‐federal  sponsor of construct the federally authorized Central Beach nourishment project. Section 206 allowed  Manatee County to engineer and construct the project, control the design and schedule and reduce  engineering and construction costs.  APTIM adapted the construction project to include a 0.6‐mile coastal  segment in the City of Anna Maria, which is not part of the Federal project.   Emergency Response  We have assisted Manatee County in securing funds and construction assistance for multiple storm repair  projects: 2005 and 2011 projects in response to hurricane activity in 2004 (H. Charlie/Ivan), 2014 project  in response to T.S. Debby, and currently working with the County to obtain FEMA funding associated with  the storm damages from Hurricane Hermine and Hurricane Irma.  Coastal Structure Removal & Replacement  APTIM assisted the County with the Cortez Groins Removal and Replacement project, which included the  demolition of three dilapidated pier‐type structures and replacement with new permeable adjustable  groins in order maintain the stabilization of the shoreline that fronts the island’s evacuation route. The  project was completed in 2016.      Coquina Beach (2015).  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  41  01C032018D    Coastal and Waterway Program  CITY OF DEERFIELD BEACH, FLORIDA  Project Description  APTIM has provided various coastal and marine engineering  services for the City of Deerfield Beach since 2005 and is currently  assisting the City with the development and implementation of  their coastal and waterway program. The City’s waterfront  presents many unique challenges, which require attention during  design and permitting to avoid impacts to the environment while  maintaining project intent and benefit. The following provides  summaries of current and previous projects we are implementing  or have completed for the City.  Storm Berm Nourishment Project  Since 2016, our team of coastal engineers has been involved with  the preliminary design and permitting of a storm berm  nourishment project for the City. The project included topographic  beach surveys along the entire City shoreline to support the  preliminary design, which included a varying design template to  restore the dune and beach berm. Sand samples were collected  and analyzed by our in‐house geologists. A Coastal Construction  Control Line permit was prepared and submitted to FDEP. The final  permit was recently issued and provides the City with a proactive  mechanism to nourish their shoreline before or after a storm.  Hurricane Irma Pier Repair  APTIM performed a structural engineering assessment of the  International Fishing Pier to evaluate damage sustained during  Hurricane Irma. The assessment included both above and  underwater data collection, which was used to provide  recommendations for repair design. We provided structural  engineering design for the repair of the structure. The project is  currently under construction and we are providing construction  administration services.  Artificial Reef Project  APTIM is currently engaged by the City to design and permit  the construction of a recreational artificial reef in the  nearshore of the City offshore of SE 2nd Street. The project is  based on the Artificial Reef Feasibility Study we completed in  2010. The project is partially funded with grants from Florida  Sea Grant. APTIM completed a materials assessment of the  existing boulder stockpile in Tivoli Park, completed a stability  analysis to optimize the design, and prepared permit  applications for Broward County, FDEP, and the U.S. Army  Corps of Engineers. The project is currently in permitting  with construction expected in late 2018.  Client  City of Deerfield Beach, Florida  Client Contact  Patrick J. Bardes, Coastal &  Waterway Coordinator   City of Deerfield Beach  401 SW 4th Street  Deerfield Beach, FL 33441  P: (954) 480‐1426  F: (954) 480‐4393  pbardes@deerfield‐beach.com  Project Date  Start: 2005 End: Ongoing  APTIM Staff  Tom Pierro – director and senior  project manager  Jordon Cheifet – project manager  and engineer of record  Stacy Buck – lead marine biologist,  permitting    Kathryn Brown – dive team lead   Lauren Floyd – senior marine  biologist  Michael Lowiec – surveying  Heather Vollmer – GIS mapping   Gary Krystyniak –  CAD drafting    APTIM performed a topside assessment of  Hurricane damage.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  42  01C032018D    Vessel Exclusion Zone  APTIM is providing coastal engineering and permitting  services for a vessel exclusion zone. Services include  coordination with the FDEP and USACE to permit a  series of buoys along the City shoreline to create a safe  area for public swimming and snorkeling. The project is  ongoing, but will include sediment probes to  determine buoy foundation requirements, engineering  design, and preparation of plans and specifications.  Construction is expected to begin in late 2018.  FEMA Coordination Project  The effects of Hurricane Matthew passing off the coast  of Florida resulted in beach erosion along the City’s  shoreline. APTIM completed a post‐Hurricane Matthew  storm damage assessment using City provided  topographic beach profile data. Volume losses were  calculated and documentation was submitted to FEMA.  APTIM obtained a fully executed Project Worksheet  (PW) for future project reimbursement.  2008/2009 Dune Restoration Projects  APTIM designed, permitted, and oversaw construction  activities of two (2) beach nourishment projects in the  City. The 2008 and 2009 projects were constructed to  address erosion that occurred during the 2007 tropical  storm season. The projects both qualified for FEMA  funding for restoration and placed 5,100 and 7,300  cubic yards of upland sand, respectively, to restore the  eroded beach.  The projects were permitted by the  FDEP under the CCCL program, which restricted the fill  placement to above the mean high water line.  Deerfield Canals Hydrographic Survey  APTIM conducted a hydrographic survey of  approximately 3.5 linear miles of 16 canals in the City of  Deerfield Beach in 2005. Approximately five  longitudinal transects were surveyed through each of  the 16 canals and depths were collected at  approximately 5‐foot intervals. The data was analyzed  and presented to the City, which allowed the City to  avoid maintenance dredging and significant capital  expenditure.    Post‐storm damage assessment  The 2008/2009 projects were truck‐haul nourishments  and utilized a conveyor system due to limited beach  access.  APTIM performed a boulder stockpile assessment in  Tivoli Park.  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  43  01C032018D    Lido Key Beach Nourishment Program  CITY OF SARASOTA, FLORIDA  Program Description:  Since 1989, APTIM has provided a full range of coastal engineering,  permitting, coastal modeling, beach and coastal structures design,  funding acquisition, geotechnical, environmental and surveying  services to the City of Sarasota resulting in the construction of five  beach renourishment projects (1998, 2001, 2003, 2009 and 2015)  on Lido Key, Florida. The City’s beach preservation program has  been highly successful in restoring and maintaining the popular  recreational beach of Lido Key and in providing storm protection to  the beach road (Ben Franklin Drive) and to upland buildings. The  project won the ASBPA National Best Restored Beach Award for  2009.   Post‐Disaster Projects  In 2009 and 2015, Lido Key Beach Renourishment Projects were  constructed as FEMA funded projects since they repaired storm  damages to a previously engineered (non‐federal) beach  nourishment project. APTIM prepared a storm loss analysis in  order for the City to obtain FEMA funding associated with the  storm damages to the beach. APTIM assisted the City in applying  for time extensions and minor modification to the existing FDEP  and USACE permits, which allowed the project to be constructed  with the existing permits. We also provided the City with oversight  and support during construction and assistance with the post‐ construction monitoring and reporting. An inlet management study  developed by our firm allowed for the use of New Pass ebb shoal  as the sediment source. APTIM conducted Delft3D numerical  modeling to determine the coastal effects of excavating sediment  from New Pass. APTIM is currently preparing a storm loss analysis  in order for the City to obtain FEMA funding associated with the  storm damages from Hurricane Hermine.   APTIM has also provided in‐kind services for the Corps’  effort to re‐establish Lido Key as a federal project and to  develop a federally‐authorized and funded shore  protection project. The proposed project includes fill  placement and coastal structures. We are currently  assisting the City with the permitting and coordination to  obtain the FDEP permit for the project. The project will  renourish Lido Key with Big Sarasota Pass as the proposed  borrow source, and places two groins at the south end of  the island.   Lido Key Hurricane & Storm Damage Reduction Project (2015).     Client  City of Sarasota   Prime  APTIM Environmental &  Infrastructure, Inc.   Client Contact  Alexandrea DavisShaw, City Engineer  Neighborhood & Development  Services  City of Sarasota  1565 First St, Rm 100A  Sarasota, FL 34230  P: (941) 365‐2200 ext. 4181  F: (941) 954‐4174  Alexandrea.Davis‐ Shaw@sarasotaFL.gov   Project Dates  Start: 1988  End: Ongoing   APTIM Staff   Tom Pierro – director and senior  coastal engineer  Michelle Pfeiffer – project manager  and engineer of record  Will Reilly – post‐storm coastal  engineering assistance  Lauren Floyd – lead senior marine  biologist, permitting and NEPA lead  Stacy Buck – senior marine biologist  Kathryn Brown – marine biologist  Beth Forrest – geologist  Beau Suthard – geologist  City of Sunny Isles Beach, Florida   Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01      Aptim Environmental & Infrastructure, Inc.  44  01C032018D    As local sponsor for the project, the City has assisted the USACE by providing engineering, geotechnical,  benthic investigation and permit application services provided by APTIM including contributions to the  Feasibility Study, modeling study and project development. The City and the USACE have held public  meetings including the NEPA scoping meetings to initiate the NEPA process. Once Lido Key has been  restored using USACE funding, FEMA funding will not apply to future projects, however, the project will  now be eligible for federal funding for storm damage repair through the USACE FCCE funds.    01C032018D G . C O R P O R A T E S T A N D I N G A N D A U T H O R I Z E D S I G N A T O R Y G. CORPORATE STANDING AND AUTHORIZED SIGNATORY 01C032018D H . F O R M S A N D A T T A C H M E N T S H. FORMS AND ATTACHMENTS 01C032018D REFERENCE QUESTIONNAIRE 01C032018D ACKNOWLEDGEMENT OF ADDENDA 01C032018D RESPONDENT SUBMITTAL FORM 01C032018D NON- COLLUSION AFFIDAVIT 01C032018D PUBLIC ENTITY CRIMES 01C032018D EQUAL OPPORTUNITY/ AFFIRMATIVE ACTION 01C032018D CONFLICT OF INTEREST 01C032018D DISPUTE DISCLOSURE FORM Aptim Environmental & Infrastructure, Inc. Matter Name Type of Incident Date of Incident What was the initial circumstance for this action?Venue Final Outcome Case No. EnviroFinance Group, LLC vs. The Louis Berger Group, Inc., et al.Alleged Negligence 2014 Shaw Environmental, Inc. named in a third party complaint by Environmental Barrier Company, LLC for contribution and indemnity for alleged damages arising out of Shaw's work on the Kane Mitigation project.New Jersey Resolved BER - L-1397-13 Southern Star Automotive, Inc. v. BellSouth Telecommunications, LLC Alleged Negligence 2014 Bellsouth seeks indemnity from Shaw Environmental' s alleged negligent clean up of 6 gallon hydraulic fluid spill. Georgia Resolved 14A-070503 CB&I Environmental & Infrastructure, Inc. and CB&I Coastal, Inc. v. O'Neil Malbrough, Jr.Breach of Contract 2015 Action brought arising out of the breach of non-competition, non- solicitation and non-raiding agreement. Louisiana Ongoing 644253 Don Bihm Equipment Co., Inc. v. CB&I Environmental & Infrastructure, Inc.Alleged Negligence 2015 Plaintiff alleges that CB&I Environmental & Infrastructure, Inc. is indebted to plaintiff as a result of two (2) separate equipment first which rendered plaintiff's equipment a complete loss. Plaintiff also alleges unapid balances for payment of rental equipment. Louisiana Ongoing C647813 Section 24 Louisiana Machinery Company LLC v. Shaw Environmental, Inc., et al n/k/a CB&I Environmental & Infrastructure, Inc. Alleged Negligence 2015 This is a companion case to the Don Bihm Equipment Co. matter. Plaintiff alleges that it rented to Don Bihm Equipment two (2) pieces of equipment and that Don Bihm Equipment subleased these two (2) pieces of equipment to CB&I. Plaintiff alleges that two pieces of equipment caught fire and burned due to the neglect of Bihm and/or CB&I for failure to perform proper maintenance, care and or use of the equipment. Louisiana Ongoing 00001042984 Dillman, Michael v. CB&I Enviromental & Infrastructure, Inc., et al Breach of Contract 2017 Plaintiff alleges breach of Contact and contents that he is owed severance amounts under his Severance and Relocation Agreement. Louisiana Ongoing 655.055 01C032018D ANTI-KICKBACK AFFIDAVIT 01C032018D A D D I T I O N A L I N F O R M A T I O N ADDITIONAL INFORMATION Sunny Isles Beach RFQ No. 18-02-01 - Marine and Coastal Professional Engineering Consulting Services Aptim Environmental & Infrastructure, Inc. - Disclosure of Similar Contracts It is our business approach to work with all of our clients to best manage their projects in a responsible and collaborative way. Per Addendum # 2, APTIM specifies the following active contracts for similar services with public government entities along the coast within 4 miles north or 4 miles south of the City of Sunny Isles Beach: Government Entity Location Scope of Work Broward County Hillsboro Inlet to the Miami- Dade County line We are part of a joint venture under contract with the County for which APTIM is currently providing coastal engineering, environmental and surveying services between Hillsboro Inlet and Port Everglades only (in excess of 4 miles from Sunny Isles Beach). No new work assignments are anticipated in the future. City of Hollywood Hollywood, Florida We hold a coastal engineering contract with the City of Hollywood, but have not received any task assignments to date. Miami-Dade County County wide We hold a surveying contract with the County, but have no active task assignments.