HomeMy WebLinkAboutTFR Enterprises Title Page
40 . , , ._ . ,.. - , .., ..
- - =.. Table-o-f-Contents
Transmittal Letter
€- '
"::::,-".-.. ",..-.1,-ii;,z.,— .1i-')-11.--'-::-=7-, ,-
Received
, ,4 i
MAY 10 2018 '�: ,q i.F`r': -. z • •-'- Company Information
:t:':-'s.:-' f. ' ': '-• _-.
City of Sunny Isles Beach t
!i
Office of the City Clerk 1
Zty: - -'13-#,'it!
_= Qualifi01
cation
x a'' aatb
.%_e_t_.,:,,,,,,_;_„..,,,„4,
t: .'" ..9 � YS1. h.Si 411 1,
,e,,-
t d
r - �k. References
Sat` L 3.j4 A #^ V
r_ '._`s` Y •Tse,,, •.,.);.:,,,.--.1.:"?
iia ? r .it--I€'., �
xResumes
}7
=
t.-�4 z Technical Approach
'"� -` " rya e. •�
7---..-...-_,-,f,-..,,,..,.•....„,-„,1
RFP Forms
•
x, _ ._,_4 .___:..7 7
III . ,
` G Intentionally Left Blank
:10-t. t ,.�
"V.�
Title Page
, .
t
Table-of-Conten s -
_ . .
Transmittal Letter
, : ..........,-;,. --,
I, •. ',._ - ..---t;-4--,
"14" /•". 1.. , ,„v 2,..„! ;
+. , ..
,:..-' .1-. • •. . t' ..,'-a Company Information i
,r..-C ; . ; •- 1
!--.....: 1 li
. . .,.. :
--
I
Qualification
'---- -
0 :J'"...1.2..,..:.',4,.,•..‘.41/•i3• 1.'j.
-,..0 S,ti-1.„....ii.i.r;•ri7
{k4.,'r*,•t”
*0
=:.--:-... .., ..' .. . .•.,,,,,,-..,.. s,..- • ,,-;-,-,-• ti
--."---;-...y.....'...t A•i.j1 "'2-'' 51'
6
References
' ..-:•".- ''' -,, •-•'..,.,`;'.-,V.
4
Resumes
: -
. ..
. .
.;,„----4',-"--- -.-1,..`-•,. -14:-:: .. z‘.._ 0';
Technical Approach
w-7....c4e,,,.,-,._1-,4‘..:i;z.,,,_
,-...-A',:..-' •,.... .-1,.::-.:47-q et, i
RFP Forms
XU' -1:1Y-: .'Y '
,C ',. t•Lt'. '
f%re''.."-"fa.....1 ' -....',:l. .11,2,....
• , z ....
k..
Intentionally Left Blank
4
• I VP v.i..`,,,.7,1'-. ,
' .:,___.; -7,-...sp.,4.47-C.:•'....-: ;
• g • ...,-- --...--,-. .., ...,
QI.F.H. EInc.
DISASTER RESPONSE DIVISION
Title Page
May 10, 2018
TFR Enterprises, Inc
Tiffany Jean, Contract Administrator
Cell: (512) 565-0710
Office: (512) 260-3322 ext. 200
tiffany@tfrinc.com
601 Leander Drive
Leander, Texas 78641
Qi.F.H. Eiiterprsos, Inc.
DISASTER RESPONSE DIVISION
:40
Table of Contents
Tab One:
Title Page
Tab Two:
Table of Contents
Tab Three:
Transmittal Letter 1
Tab Four:
Company Information 3
Tab Five:
Qualifications 5
Key Personnel 6
Division of Responsibilities 6
Organizational Chart 8
Recent Experience 9
Current Standby Contracts 15
GC License
Active Annual Report
IIBonding Letter
Training& Certifications 16
Tab Six:
References 17
Tab Seven:
Resumes 18
FEMA Familiarity 27
Tab Eight:
Technical Approach 28
FEMA Team 29
Preliminary Planning 29
Imminent Event 31
Load& Haul Phase 35
Tree Removal 37
Limb/Stump Removal 38
Reduction of Debris 39
Segregation of Debris 41
Disposal 43
Haul Out 44
White Goods 44
Vehicles and Vessels 45
® Recycling 46
Project Closeout 47
Enter rises, Inc.
QI.F.H. p
DISASTER RESPONSE DIVISION
Subcontracting Plan 47
Safety Overview 53
QC Overview 54
Environmental Overview 63
Invoicing Procedures 64
Exceptions 65
Current Inventory 65
Tab Nine:
RFP Forms
Financials
4011.F.R. Ellrprisos, bc.
DISASTER RESPONSE DIVISION
all May 10, 2018
City of Sunny Isles Beach
18070Collins Avenue
Sunny Isles Beach, Florida 33160
RE: Disaster Debris Management and Disposal Services 18-04-02
To Whom It May Concern:
The TFR family wishes you the best in your selection of a Disaster Recovery Contractor. We
understand that the selection of an emergency contractor is a major decision and we genuinely appreciate
you taking TFR Enterprises into consideration. We comprehend and are undaunted by the challenges you
may face, as we have been through the process and recovery with over 150 clients who have been
impacted by devastating events. TFR Enterprises, Inc. is a national disaster and debris management
corporation based in Leander, Texas. With over 28 years of disaster recovery experience, TFR has
collected and processed over 25,000,000 cubic yards of debris. We are proud to be recognized for our
quality of work and capabilities by being awarded two divisions on the ACI-USACE debris removal
contract. TFR is prepared, equipped, and ready to provide you with a turnkey, expedited, cost effective
emergency response solution. •
Capacity. No job or disaster is too large for TFR to handle. Our experience speaks of itself. In response
to the devastating 2005 Hurricane Season where we hauled and processed over 6,000,000 cubic yards in
180 days, simultaneously managing 14 TDSRS sites. During the 2008 Hurricane Season, TFR executed
® debris management for 1,800,000 cubic yards using 10 TDSRS locations. More recently, the 2017
Hurricane Season proved to be one of the most crippling in US history. TFR managed 21 projects
in Texas, Florida, and Puerto Rico simultaneously. With a subcontractor list numbering over 1,000
and a fleet of owned equipment, TFR Enterprises is prepared to tackle your greatest challenges.
Depth. Debris clearing, removal, and processing are only the initial phase of your recovery efforts.
There are many ancillary tasks that must be undertaken for you and your citizens to get back to life as it
was prior to the storm. TFR has extensive experience in all this work, including: land-clearing, stream
and river clearing and diversion, tree removal, trimming and pruning on parks, golf courses and rights-
of-way, tree repair and maintenance, debris recycling, tub grinding, hauling and demolition.
In-House Capacity. TFR owns over 150 pieces of equipment, including a fleet of self-loading debris
hauling trucks, rubber-tired/tracked loaders, heavy-haulers, excavators, dozers, field offices, and eight
(8) Diamond-Z Model 1463 Tub Grinders for vegetative debris reduction (grinding). Not only is this
equipment uncommitted on current long-term contracts, but all of it is equipment that is primarily
designed for use in debris removal operations. This resource of company-owned and controlled assets
allows TFR to provide an expedient response.
With a geographical footprint that allows for quick response to Sunny Isles Beach, TFR can respond
within 4 hours to immediately begin emergency road clearance services to provide a vital lifeline for
federal, state, and local emergency responders to assess damages. TFR's goal is to have a site ready for
acceptance of storm-generated debris in less than 24 hours from Notice to Proceed. Our Mobile
Command Units have full communications to assist you if your communication abilities have been
compromised. Project teams are immediately available to quantify debris, provide an overall damage
® estimate, and begin a recovery/removal plan.
QI.Fll. EInc.
DISASTER RESPONSE DIVISION
At TFR, we know that projects of this scope can be of huge financial burden. Our staff is well trained in
the FEMA reimbursement process and we are ready to assist you throughout the entire reimbursement
process. ALL TFR'S CLIENTS HAVE RECEIVED 100% OF THE ELIGIBLE
REIMBURSABLE AMOUNT. Our financial strength allows us to help you get the project kicked off
and funded while the reimbursement process begins.
Differentiation. Many firms within our industry can provide the fmancial stability, past performance,
and crews of subcontractors. TFR takes pride in having one of the industry's largest fleet of self owned
and maintained equipment. This fleet allows us to mobilize in a more expeditious manner as well as
perform many projects without the use of subcontractors; avoiding many of the issues entailed therein.
For contact purposes regarding this response, the City's contact person will be our Contracts
Administrator, Tiffany Jean. Mrs. Jean may be reached on her cell, (512) 565-0710 or via email at
tiffany@tfrinc.com. She is ready to assist with any inquiries or concerns that you may have regarding
this RFP response.
The principals of TFR Enterprises, Inc. declare that this proposal is in all respects and is submitted in
good faith without collusion or fraud and the person signing this proposal is authorized to bind the
corporation. Also, should TFR be selected we are committed to exceeding the expectations of this RFP.
TFR guarantees that we will comply with and meet the standards listed in the FEMA"Public Assistance
Program and Policy Guide, January 2018."
Once again, thank you for the opportunity to submit this proposal for disaster debris removal and
411 disposal to the City of Sunny Isles Beach and its representatives.
Sincerely,
Tipton F. Rowland,
CEO/President
601 Leander Drive
Leander,Texas 78641
Office: 512-260-3322 ext. 200
2
I.F.H. Enr rises, Inc.
p
DISASTER RESPONSE DIVISION
4111 Company Information
1. Name of Company: TFR Enterprises, Inc
2. Headquarters and local branch locations:
601 Leander Drive
Leander, TX 78641
*TFR does not have a location in Sunny Isles Beach however, if activated we
would set up a temporary office location.
3. Web Address: www.tfrinc.com
4. Business Structure: Incorporated in Tennessee
5. Date Founded: 6/12/1989
6. Headquarters Telephone: (512) 260-3322 ext. 200
7. Proof of Insurance: Please see enclosed Certificate of Insurance
8. Mobilization Plan:
72 -hours prior to landfall of the event:
The Operations Manager will alert all employees of disaster team of the impending event and
have them begin preliminary personnel preparations for 48-hour notice of departure.
The Operations Manager will notify the County of the designated TFR response team's point of
contact and provide them with a 24-hour immediate phone number.
A Senior Project manager will be dispatched to an area within a few hours of the event location
and establish a temporary staging and deployment area located within a few hours of the event
location, to be used for temporary staging equipment and personnel during the 24-48 hours
preceding the event.
48 -hours prior to landfall of the event:
TFR Equipment Management Officer will have already mobilized TFR owned equipment to a
temporary staging area located outside the Forecasted Cone for landfall of the storm.
Upon receiving notice from the contracting agency or at the discretion of the Operations
Manager, TFR will transport its resources (equipment and manpower) toward the anticipated
landing area so that equipment and personnel are within a few hours reach of the anticipated
"strike" location.
Equipment to be mobilized
The type and numbers of equipment to be mobilized will be based upon the characteristics and
strength of the storm. For example, if predominately wind damage is anticipated certain
resources will be needed, and if rainfall and flooding damage is anticipated, a different schedule
of equipment will be necessary. TFR anticipates that the minimum equipment to be mobilized
would be:
• Rubber-Tired Wheel Loaders 4
• Dozers/Track Loaders 4
• Skid Steers 4
• Self-Loader/Knuckle-boom Trucks 10-15
® • Bucket Trucks 5-10
® • Tub Grinders(if needed) 2
3
QI.F.H. Elac.
DISASTER RESPONSE DIVISION
9. Outstanding Litigation: Neither, TFR Enterprises, Inc. nor any of its officers or
principals has received any administrative actions or warnings taken or issued by
any federal, state, or local governmental agency about the provision of the same
or similar service as covered by this RFP, or payment of moneys under the terms
of any agreement(s) relating to such services.
10. Financial Stability: TFR Enterprises, Inc. is a wholly owned corporation, since the
company's incorporation in 1989, completing over 150+ federally funded debris
removal contracts in its 28-year history. From a dedicated owner to experienced
staff, TFR offers not only the knowledge to perform any size job, but also the
financial flexibility to complete multiple large-scale projects simultaneously. This
was exemplified during the 2017 Hurricane season in which TFR performed 21
concurrent projects stemming from Texas, Florida, and Puerto Rico, more than
$40,000,000. With such large-scale performance across an enormous
geographical area, a company must retain the financial flexibility and strength to
pay subcontractors, suppliers and employees on time, every week.
TFR maintains a strong base of corporate assets: (1) property, (2) substantial amounts of
equipment, and (3) an extensive line of credit. Retaining the financial capability to
respond to any challenge, additional highlights include:
• TFR maintains a total, unconditional bonding capacity of$50,000,000.
® • TFR utilizes a line-of-credit in the mid-to-high seven figures to fund multiple
projects in multiple locations.
• TFR has completed every project it was tasked to execute and has never been
terminated for default or suffered any liquidating damages.
• TFR has never filed for bankruptcy and has never been involved in any liens or
litigation involving financial performance or subcontractor non-payment.
For additional information on TFR's financial capabilities, below is a list of the
company's current banking and bonding companies along with the points of contact for
each.
Banking: Bonding: Insurance:
Frost Bank Baldwin Cox Allen Higginbotham Insurance
PO BOX 1727 5930Preston View Blvd 1221 S. Mopac Expy., Suite 160
Austin, TX 78767 Suite 200 Austin,Texas 78746
POC: Michael Falk Dallas, TX 75240 POC: Erin Woodard
Senior Vice President POC: Brock Baldwin P: 512-583-1543
P: 512-473-4960 P: 972-331-3709
*Audited Financial Statements are enclosed
4
4011R• Eoterprisos, hoc.
DISASTER RESPONSE DIVISION - _ —
0 Qualifications and Requirements r-----
Disasters are unpredictable. Disasters can vary in size, "TFR demonstrated knowledge of the
scope and intensity. Yet given this inherent unpredictability, work required,provided the
governments can take the necessary steps to ensure the , necessary equipment to perform the
safety and relief of their constituency. work and performed their work in an
expeditious manner."
hAt TFR, we address the needs of our clients long before the Jeffrey Calla Boulderr County,
Cty, CO
er
establishment of a relationship. Every project is different. S.
J
Every state, county or city, desire and highlight different
aspects of disaster relief and recovery that they deem
MOST important. With this ever-changing landscape in mind, TFR continually stresses the proper due
diligence and planning to fully comprehend the type of service that each client desires. We routinely
review and criticize our operational and management plans to assure that we present the most practical,
efficient structure to complete the project. TFR's knowledgeable management team retains over 55
years of experience responding to hurricanes, floods and other various disasters.
What allows TFR to provide an expedient response? Pre-planning certainly rFl, �
encompasses a large portion of this service. In addition, TFR maintains a fleet IFr l 't �
' '
.,�'-•_- is ,. p;-�
of over a hundred (150) pieces of company-owned equipment pre-positioned �,����;,,t s,�t;:a�;�;�
across the Southeastern United States. By staging equipment directly outside `� B4.,:-/'-.74 i •
the impact zone, TFR can respond within hours to immediately begin .,,,,---,..., F,I*F'-= 1..5...,!..*_t.
l��j ;
emergency road clearance services to provide a vital lifeline for federal state ' I
and local emergency responders to assess damages. Furthermore, TFR can ;►. ::',.
^"
re and construct a TDSR site for immediate acceptance of storm-generated ,.rTr`=`
prep P � �`�_ _ S.�i
® debris in less than 24 hours. To fully augment our operational capacity and to i`" ''` `,,,, .-• .-:-.----':.------1:
aid the organization of relief efforts, Mobile Command Units can be deployed to enhance response and
achieve greater coordination between parties. Concurrently, project teams scour the impacted area to
quantify debris, deduce an overall damage estimate and adapt our preplan accordingly.
TFR prepares for economic instability in the immediate
_ aftermath of natural or man-made disasters by
-- maintaining strongrelationships with suppliers and
, 4 P PP
� �_ <..y;-,_:, organizing resources for dispatch. Additionally, TFR
''crpmmAND fin,& –__ :- owns the necessary equipment to house and feed
��,—= .t'1 personnel temporarily as the local business community
Ps; —r==. 9 reacts and rebounds from such a disaster. Other initial and
Q' - 7701, � ,•_� _ r.
– --=-t=- – – , vital supplies, such as fuel, parts trailers, welders, wood,
and other necessities, are brought from the home office to
certify that work stoppages shall not occur due to inadequate logistics. However, the backbone of our
logistical support team is our maintenance crew. TFR would not be capable of providing the timely,
cost-effective service that we do without the knowledge and experience our maintenance crew retains.
With a dedicated warehouse at the home office to two (2) traveling equipment trailers, the TFR
maintenance crews ensure that our equipment is functioning safely and efficiently with limited
downtime. We strive to foresee any potential encumbrances and take the appropriate actions to
safeguard against such occurrences.
Operationally, TFR manages on the principal of transparency. We always remain available to answer
questions, address issues immediately, and submit reports on time. This is to the benefit of all parties
411
5
T.F.6. EDrprises, Inc.
®
DISASTER RESPONSE DIVISION
® involved, as this is a team effort to respond to a major disaster. As safety and contract responsibility are
the utmost priorities to the principals and officers of TFR, it is the policy of management to see that its
employees and subcontractors conduct themselves with integrity and courtesy in the performance of
their duties. Following a disaster event, there is an urgency to remediate the damage and return to
normalcy as quickly as possible. The principals and officers of TFR firmly believe that this and price
competitiveness can be achieved courteously and without sacrificing health, safety and confract
integrity.
TFR's Key Personnel
TFR maintains a team that has been conducting debris removal, reduction and management projects for
28 years. From Hurricane Andrew to the devastating effects of Hurricane Katrina, TFR personnel have
participated in relief efforts across the country, on different continents and in varying debris capacities.
If awarded, you will be contracting with a company deeply rooted in customer value, experience, and
expediency. TFR is proud to present one of the most knowledgeable project teams in this industry.
Key Personnel Position Email Phone
Tipton Rowland CEO tiffanyw@tfrinc.com (281) 731-4398
Julie Rowland CFO julier@tfrinc.com _ (512) 260-3322
Ronnie Moore, P.E. VP of Operations ronnie@tfrinc.com (512) 779-9926
Dennis Sissell Safety Manager tiffanyw@tfrinc.com (512) 579-9123
Sharon Lyell Project Administrator Sharon@tfrinc.com (512) 576-3000
Tiffany Wilkes Contract Administrator tiffanyw@tfrinc.com (512) 565-0710
Jennifer Frankovsky Business Development Jennifer@tfrinc.com (512) 567-6391
® Kevin Rolison Senior Project Manager kevin@tfrinc.com (512) 944-8766
Rigo Mejia Site Manager Rigs2369@gmail.com (512) 779-7722
Matthew Kean _ Project Manager tiffanyw@tfrinc.com (512) 581-8712
Division of Responsibilities
President / Operations Planner
The President will provide financial resources, equipment, and personnel in support of project. Supports
and invests authority and oversight to Operations Manger, Safety Officer, Quality Control Officer,
Environmental Officer, and Health and Safety Officer.
Vice President/Operations Manager
Has authority to commit Corporation, sign contract and modifications. The Vice President will report to
the President and be a liaison between the Company personnel and Client Representative. The VP is
responsible for contract interpretation and application to Company personnel, and implementation of
Scope of Work.
FEMA Compliance Officer
FEMA Compliance Officer will report to the Operations Planner and Operations Manager. Responsible
for reviewing contract documents and ensuring performance is completed to FEMA specifications
including, but not limited to, eligibility of debris and Davis Beacon Act standards.
Safety Officer
Safety Officer will report to both the President and Operations Manager. Has complete responsibility
Sand authority over all safety issues at all levels of contract performance including the power to
unilaterally alter, suspend and/or halt any operation or portion thereof that endangers or potentially
6
T.F.R. EHthrprises, Inc.
DISASTER RESPONSE DIVISION
endangers life, health and safety or threatens the protection of the environment. Includes
documentation, daily reporting requirements, communication and conducting onsite training and
inspections.
Quality Control Officer(System Manager)
Quality Control Officer will report to the Operations Manager. Has complete responsibility and
authority over matters relating to contract Scope of Work adherence and assignments of QC personnel
to field crews. Includes documentation, daily reporting requirements, and communications.
Environmental Manager
Environmental Manager will report to the Operations Manager. Has complete responsibility and
authority over matters relating to compliance with Environmental regulations and requirements,
permitting and site inspection and approval. Includes documentation, daily reporting requirements, and
communications.
Senior Project Manager
The Senior Project Manager will report to the Operations Manager, responsible for day-to-day
operations, includes waste stream documentation, daily reporting requirements, communications,
enforcement of Scope of Work, and oversight of Load and Haul and TDSRS Managers.
Project Manager
The Project Managers will report to a Senior Project Manager, responsible for waste stream
documentation, daily reporting requirements, communications, enforcement of Scope of Work, and
oversight of Right of Way crews and Crew Foremen.
Site Manager
Site Manager will report to a Senior Project Manager, responsible for waste stream documentation,
daily reporting requirements, communications, enforcement of Scope of Work, and oversight of
functions such as site entry and separation activities, debris reduction activities, White
Goods/eWaste/HHW material separation and handling and C&D sorting, separating and recycling
activities as well as general site management.
•
I J 00
® L
1 O
L _° 1 3H
° - 0 , �= i - P 3 -_ran-°
cr.: ,^/ 1 L CJ —
" � 1 1 U = � '- --1
c 's~
ill
x
U
Cv 1 1 Oa
Ci..)
$', 1
r^- 0 y.,
C Un: Il
CO aZ! r..3 (
1.
z" S
i Ei 0, ,i 0;
I ro •01 fl'.-9,
I n -�J 1 O)-41
L 1
5x 11: o
srttrn
i
,• ` - 1 1
• i
Z - , , tt c, a 1 '
MOININIIMPC N h. ,. t Z o, $ 1 ;a4) d
COO j 9: tint r ::p L '--'- '
1
■� V
ua C; n rr 1
r}I tr. v L _.._.....___.__._
WI
Z L �: , ^n 0 Q I
•
0 = �i nj p� 3 L 1 L
J
w ,a _ 's a=
y �� .it ii ;? ) n O ttt 2 1 3 L 1
idi ■ O n` e� is I _ O i fl. [
II O O' 1 _ r. _ .=
` J c3 @ O O I _ _ — i
G
I t' g. a) it a� i r 1 [
O. ai
i O ari
p D
0 Le)
N =[
II
u 1
k. O a 1
u ^ L qi r — t
U �i• = o
hl c cs a� ^ L
CY Ili
r '
• "
"a naimr,
., ,w„ri Aun:i t 77
✓ Gi 111 U. 1
O II : ! U
" w 1
• G CO , a. 0 III — L Q
Z _ ct
rC O
LO � N i etL! C O ^ ! UI1.1) ea n
I, t d T O
U1 --I.
4 .< 5 A y .- IP
al _cI
r >- }.
Z ' ' °' •-. I T
® I -T .
0
O O O a; O O. O O O O O O O O O O O O c
® O co O r O O O O O O O co O O O O co O
O O O Q
(xi O N N O V'1 G, [�
O O O �O N O M O %.,o7 7 O\ C\ O t
O O O O [� O N [� O s 7 N 7
1 O O O 00 00, O\ - O C N N vi O' C\ O
n
r N O. O [� 00- N O 71' 0\ O O N 00 01' N O
` O O O• M CI, r- 7 69 M V1 VO •-• V1 -- 64
J O� N0 N V•1 -- N r"-- M 3 b9 N E/-) EA 69
1..
69 69 E- O. 64 64, 69 69 EA 69 EA
Y O
O 1
V 69
i
I
V- t` a r- oC O N T 0\ \D! - - C- T N y M N a N fA --
,r, - ^- 00 C N
�, •- M •- M T[� U - O - \0 0 00 0 7 a) N (` )V1 V 1 '0 1- - - 0 - t'•
,� - N 7:= N CC. O '6 M 0 (V N M' 7 N U CV,•� C- •- N rU, M L N = 00 - - U '0 j
VV M c M V) ^ - L N i 1` ^ V> C " N u 7 O L.7 O N U O, 0 oo a N >
t N f N 0 O. U V) O 7 „°-) 0\I y - O M 0. Vl �U» l- ,. Q\ ) M -I. 00 � '0 T[- U oO U
0 1n 0 V) oc i- M -j U r 7 C- 0` - nI .0 O 0\ O U 00 -. 'C 1n
U 7 u ..-.•. M at CC G\ T V) c:-. C> 01 _ t` N ,,7-' N N •- 00 2 � 7., (`i4 fV
- ,-
+., ,�'' M aa) M •••-• l� T V) •C �t ^ M, - '0 0 \-O:•- M 3 C V1 -^7 '� - cr., - T- 0 N O 'C. •O
,-- - - 1 0O C O CC Lt ,N 00 U 00 C V1 C O O - '-C C \D 0 00 L M _- M 0
.1 - N '- N .7..1 C M 0\ 00 -� an M.!` 00 Q �G M U 01 M ' ' CC 0 (V ` 00 0\ '',
�. v ..i cC •--a ..i N .i ..i ..i ..i> ... ... `.' .�Q ....Q \..� ••••••".U `r-' .�
I ,
O
s N
__ _ :A - --•
'- '- 'G
-C-'I CI CI c3 r C
CI CI
�1 > = 0 O 0 0 0 0 0 0 0 ^ r.
W s O Q v Q Q Q Q Q Q Q Q: U U U 0 O
1 •L r Q b b b '� � J '� '� CLI rNZ 0 '✓ a o s v cv cr cCI V '% Q Q U
Q ro . n _
,- ,- : - 01. --® C ,� L
73
W �: U 7 7 C. 0 C 7. •0 C C O O O cC
■ p - Q CZ7=1
C C as cs o CZ r C fl fl fl > >
c ° o
C Q Q Q
U .......5 Vo - n c ::.1)• w r c
Call rn z`..1
a) "'A -• C - - - - - - •I v.
L O - - r P L' L 'l.
C O
.77, L L L L L •L •L — L
cu
O L L L L L i L L L L `L ':,L
T > T T T T
cC U co <I) a) a) a)
P r C r- C C L L L L L L
— - —
J C J cC . ^ ^ U. ^ U U U U 0) a r-) a) a) a) ,0U- U
C tU. % L ti cd r- 5 1` e3 �;c9 r- ccc: r- C r- c9 r r r- c3 r-, r- 79 r- C r C r- cC c3
O `- O 1- •U_ U U _U U_. U U_ U_ - U U U_ U_ U U_ "- U U
• • • O O O O O • O • O O O O O O O:•- O
'0 • 'O E tL. N tL. N E N t b N tL. N 1: N 1= N tL. N i N 1= N t N tL. CI 1= N t N
UU3' = = 0 .� 0 - 0�_ 0 = 0 = 0 .- 00 = 00 .' 0 0 � 0oo co j' 0oo -
1 r -1
- N n i r-• [s LL, cCi
U O O O O C I>C'C T cC
_ _ _ _ r
•
v Q Q Q Q Q 0 r. > z -1 Q 0
e '4,
O O Oy ¢ CZ
a OO LOo Oo O `o 0 0
Q Q ;3_, LLU U r/ x x X
0 'U 0
O o 0 o O O O O o 0 o rn o 0 0 0 0 0
410 0 0 0 0 0 0 0 0 0 0 in o 0 0 0 0 0 0 -
rri o 0 0 0 0 0 0 0 0 00 o C o 0 0 0
oc o 0 0 0 0 0 0 0 0 OG o v O O O
N O O O O O O O O O l� O N O O O
10 V� O O O O O U) O V•1 -- M N M M ,r1 In N
7 C\ O O O O O (N M 7 - N in 7 l� 7
EA EA) O O M M EA EA 7 N EA 69 69 - EA
N C\ M 69 EA EA EA EA
•
•
•
V
0 r- 01 y 0 C VCC � 'D /O CO CO �O f -: a N C r- -cc m O L U C - N O\ y N O
VO •C 7 ;! N 1' N ,O 7 C M '= M O - O - K 7 - o 10 in v l- v O O\ 1 O
M L N -0 N L 7 O M - " Li-) r- - ^ V) U ... 'Cr C3 7 f"-, M ^ 1 r__.' C M. C ...,
l� Zvi - + c v U o 2 o Cl) a � c� a, ° c,l a � > in (j (N cc ,r cc'.2 -- 2 o U 'a
N -L l- ,� O) 7 7 M L- I ca r- cn t` cn O\ U N cc 7 7 7 '- O C
--
CO C N T c M U - M ci O\ C!1 Y M 7 C •7' a Vl � M tT. a 00,V r- T N CO N
N ^e 'O po ^ C CO v) cc Ls-) Fl- 3v) cc7. v N N_f„ 7_ rn Irl -
� - oc O - o l- cc , v) - 00 CC CV C N M O CO - et OC U r- O O p O. >
.M... C Ul �/ l` M 00 -, C 1 N G N .U M 7 .�.-. N - 01 V')'� N - 7'--, 7
COM▪ Z
C O
M n ca
e va _ - •f.
COM r o c3
- > r Q s r
o - O o
ammo O = a a a CO C' _ CO CO
J v, t l) COt 'I. v... a z z
O n '� 0 O O O O O O jaCD
- w es.
'f '� CO •D -p a. Qz , fl. fl.. �; U U. U_
giimm NZ Q lO ,-
5i r c3 D ID D fI > > >
cs �.
d
0 =
�+ O COC C. CO L La L CO C_ r c3 a r a) a) O o
0, _� _W C Cec: CCO : ;a
tz,
tn
T ”" 0 0 0 o O o
H 0 - 0 - - J.• Z .'!.• 0 .l-•. •Z 0 =' U L L
o'n
L 1 L :-
a.)
L L
1.). L U U. a
N L O `. �' 26
i �i 0
O �, o� a
��
r F H.
U .
T
U
> U UC J
L ,
r r L _
a) U a) N \ \ O' O O.
„ - 3 g 3 8 3 3 cgs 3 N o U. U • U o
- U - U U a U U U U U J . f r y' •r, r c3 r y 0 O 'CO
(N N 7 a y= c3 = ca = a z cC�a,o ----- O — O C _O — OCO2 —_ C U - N - CO
O O .L . '-L .e .e .., L;L O. L co L O V1•L - L• O .. L -' V1 U N U N `O
i
CO
r O
�p r.")
.r H CO X, X `.
U v) M N CO X a� a O.
'0 Z L O O O U. U a T a - -.
C3 CO L '6. U U - CO• Z - .> - �a r
CO `a) U. .L. .L.. r U `a) O T CO 1 CO O )0
• ,..,..
O O V1 0 0 0 ,� ^-� U LO O O U
O --) -J -a - < U C X a a c3 0 O
U 0 =- L L -J - 7-1D- 30 - U m < U •
U �
O O O O O O O O O VI O O O 'C, M M N O\ -
O O co O O O' O O 00 O O O O•, t` - O 7
0 �O O O O O O O O 00 O O [� O C (t
G1 O O O co O c:- co O O O 7 O '' co. M' in V
O co„ 7 O O O 7 O O N O co 'D 'D r- t-
v) 'D �D 7 7 7 O\ 'D a a O 7 r N 7 . V)
1-- M O\ r Gl O\ M 00 n1 00 M ' 7 7 [� O M
69 EA M .' . M 7 69 .S 7 69 M O M, VD. 00 \D CT
69 EA 69 69 69 69 t` EA 69
EA 69, 69 69
00 VD L r co as —_ — >,a = — o, —_ — >, O 00 — o o t � CT 0
CT a) CO ^ V•t 00. - 'C — -o — 00 0 'D — -0 — ,{', L M L 'D O I O 0 C\
'B O OC 00 a) O U OO U N ^ ^ O 00 U N — a) ^ = O —. O U O 7 U
'D C.T. M ,"�' 00 y0 l; 30 - N N 00 `. 1� 30 — C N ' r;l ^ v) LO CV O CO O. N CO O —
c‘k— 3 V1 j Mci, V•1 3 N 0. OG y M M 3 N n O0 aj M ni r M C., (O 00 3 C Y c!NC (,-
U co) co 7 M C1 CT CO CT M '—' 01 O\ M N N 00 OC 0 o O
7 I N M N v00 C' M M ... Cc) N 00 0 M • M 00 p 00 T.� T) 'Cr no 7 O co,'-7 -
N v: p 01)C , N O N 'D N L N N O N Cl L N - - N .-. '- — . 'i,. ''C -ct M(., V) a,
• z
- O
- > I. 0 I 0 CO O O. O v, I
■-COD
D i'. C3 CC CC CC r I p p N N N N p p
04
y r\ •— C—r.. 'B •-. 'J. I L CZ CZ CZ LZ
:S CC S '`3 •-L O. "0 1'3 'J :S C3
Z >, p' c-0 0 = p p' p cn C > r 3 r r cs e
0 C o r 0 0 , ca r a) - o 0 L - oleo - o, v v
= ,� CO 7 = 3' 3 • 3 • 3'
LL., — CO .D L CO CO y •'p •p U 7 "O 7 7
• 0, ...i > N 1.) > > > & a) a) > CO a)•a) I CO N'^ a) CO a) ate) 'a)
"[-
(lIt) • I O. y/ I I I c) 0 0 •- 0 O � O I° O 0 0
< .I s0 "� N a) 1-3 N N, N a). a)
o p 17
I p p p nd
I I nI I I I V. I I I
SD
O V) L p L L L •L L L. L •L •L
a) ) C ° a) a) i Q)0 a) C n
p p p p p p la• p p p
V1 C/.1
•
O o
ken7
0v) ^ kr) r- kr)• �.. kr) - 7;G.7 - 7
o c C — c — ,a, a E
' . (1--,-,CA r, rI I I ;Cl) ..--. Cl) Cl) r Cl) � 0 sC 0 ,T; 0 i 0 0G 0 �0 0 � 0 z
tr, 3 O v) 0 v1 0 v1 0 in 0 v 0 v1 0 � v) v) cn v) n 7,I� 7 7 - - O
--- OO — O v1O ° — ° O - O ° - O - - U — 0
N - - O :7_7 - - r - cU CO --, a, -la) -, : UN
^ E/) OC:. - U, k ) Lv1,L kr) Lr. 'Ci. v1 ,1, v) L:. v) L, v1 ,.. 7 7 .. Cr .-, M i
M N i— L
—
I
co
j CO X CO I '! I CO 1 r O CO
Q) a)
�. o L O U
o .-
L �_ r _ o p C7 . o
fl. n. 2 3 ° = CO U o z U
0 a)
p ° O o o - O 3 U 0 ° O I O O o
p >,
> p v > p! p p > .-
2 U H X U U Ei) H CO .l. 2 0 c. Z Z EUn: U CO)
O CT \C 71. v'1 O O O\ O U v1 O O O O O O Cl
® O O I \C t.".• O O \C O ,..0N O - O O O O
O Cl V CD O O 00 O t--*- O 7 O O
O t"-- CD CT �D O oo O v1 oc O' 7 O N O O
kr) O V M 1` o0 1-- O M O Sr O O O O
\0 o0 V1 O O Vl 00 c,-, V') 00 M1D• O
.1t '.0 i 7 O\ '. M '0 M M O' N M N V O
N 69 — N 69 69 00 M 69 — C1 00 M
69 69 69 69 69 69 69 69, 69 69 69 (V 69
69
t.
CO •- 7 O , C' = N y0 M 00 _q O >,O CT tz. kr,o — _ M M M M y O O'4 O
M U O N — -_-_. — U N — V O -' 00 CO 00 00 10 Y 7 1 N
v) oo •L N J C4 O O - O cv O J 7 - 00 oo oo oc M p N 3 O
00 - ••- M I M c. 7 r- V1 ,-, . ._. . _ 1 = 1 - 1
Q o0 v) 1D .�". O\ -- `L r- r-- 11
:C r- '� r-' 0 c'i n" r- p M
CT ca kr) L kr) r (N a \J �. O\ 0 U C- \D O p C\ �O 1D \D \-O ^ 1O >-,- , as
7 . O M LL.1 V'1 U V') N N 2 00 T M "4 71• -� M M M' M M (N M C-
.� U > i N r... i••. t.-� .--. ^ iU. .a i--. O O ^,O ^ O i.•. i.•. CEJ ^'
U O O. •"' O v1 y v') Com, v1 kr) 0 kr) y kr.) v1 kr) kr) T N
O� % O ,$- l�,.a N U N E.'co --, co O Q co O ,_, O O O rV) O c4 O -, co 4 O c3 M
U
. Z
CM
C o
— N CCI •
1 z ca( a `) L L
CM > 0 i .0 .0 O O - O a)
C1 _ SZ.'D r U CZ U C. t? •r Q Q
•I ' z 01 U. :A i O O Q Q o -0 -^0 'I• > > •L ii
C. N 0 O i.D r _ C C a a O 0) co O Q
C C U U
a� oT cki
oz5 .o a > >
r
0 _ o ` L
O � 0 3 0 OOw 0
)
• o c✓! > > o. n. x > n 3 o., > o 0 0
,-
Liam. c 0 3 ,� o f r ozL. - o a n,', O
•
�� w . fl
V J ca c3 = 4. r- C
(41..."
CC
CS
r N o
Q O O
.r_-
-0
L •L =� > > >
U N a) N U
A
70
•
00
M
M' M M M M •-• M M! ,(/) M
!_ ! -c-7,- oMooC C OiO'C M C M C M C - v ',•••••,-
,..-
` r, M f N, !�, O f ^ -a -O - . O, . O, i. O tO C, if--
" i-0 'pr O , O r ca - M � ' •i•V CA
M O M O M O M O M E M E C1
E M E M E M c4 - c/D M M:c4 M Mci) M (4 M!yL•, -
.- 0 -. Oz p .- p - O - o o - o - o - 1) -c-3 y - y - iy - y - 1) - y ._.. p
� Com, 01 :.. Q\?L' 01 = O1 � � �. Co L.Co. H � - CO -. - �. Cr' 2 V 2 4 2 4 2 M 2 M!= -
� ca
E ' z U
0 O �_ O C �r rC l ct =Cca
z
'CI
; 'D. O cs t ..Y ... Y.' Y 10 C CG!..
I8 p z ca ca, CJ cJZ
"o• O 1 p O .`L O 1 Q Q Q Q Q 'xi, I C
o U U 0 > o = O = ' 5 >r;
- cz
U > c o T U 0 o c � cn C VI c° �''t
-; O >' c t-U O T f r j -
r r O z U
0 o
o
ca
o O "o p �G c3 ?� _ LL O O O O ca 'z - +-'
—1 3 < - 0 U v U U Cn C cn C 0 C/p
O O O O O O O O O O O O O O O O M
® O O O O O O O O O O O O O O. O O
M N M O O v'� M O O v:3N triO O
‘.1:) 7 �O O 00 0c C•-•• CS O [� O_ O 00 O O
G1 v? N oc O r•-• t� O oo O 7 M O O
00 O N M V V•1 00 CC" 00 O V•1 CT N 7 (S O
'r O M M O N O (— [— O 7rcc, M
6A N 7 v
6A 6A 6A EA EA l hl \-
ffi 69 6A N _O N N O
EA EA EA 6A 6A
6A
EA
0 V ^ N = p Tp O r O N N L 01 L N' M > 01 0\, 1 O
L N •em ''' vi O i1/4C E'N O O. ,
0. N , 7 .__1 N 0 — 0 7 -�-, 0G LO � — G1 0 cv c •—
cc 7 c r, v O vi O\ _, 0
^ N i — N N 00 CA 7 N ca N O M (.) v1 O M' N N N' tO" p - - 0 vl 0 a) O
U M a M O O O M i M t- M - 0 O - 0 O O O
■ Z
COO 0 0 0 0 0 0 0 o r
a'f O
r. y n n rs a ss a s� a a
•1J °W. '1.-..
.0 ! 1 LJ L 0 L
W Ca a n a a a, a 3 o7.3
N `-y j r- V' Cr.; CO CO co co co co co ca
0 _ 'a O O O O, O O O O. a
a r r U • U
0c p p > a) 0 a) 0 0 a) a) a) a) c
r0 r 0 N N. r/ �/ 1,.. r/ N >
— r CO `a 0 0 > CO Co CO Co > > Co CO co
c a r o 0 0 0 0 0 0 0 0 nO
0 N > > a L ^ ^ ^
< o 0 ,o a) a) a.) a a. QQ) a) a� a) 3
no
r r r r •r, r r $ r
0 L L L L L L L •L L
-0' _0 -0 -0 0 -0 S
0 0 0' 0.) a) a) a) a). a)
0 0 0, 0 0 0 0 0 0.
>, >, >, >, >, >, >
- - .n .a -0 'O .0 N a)
CJ cr., CJ "� C3 ca r•' a L
f/� rn V1 M V1 M +n Mrip M V] N C/0 N O — — E
a^ .— — ^ — 0 — v — a) _ a) N N— N' r N z N �, — C \ 0 — O O O
CO , U_cc kr> U_ rl cc_.) M cc U M cc U — U -•- t" M ,y O\ ,,c G1 0 O Co O 0 'm N
• N N •r N •r N N N N i Q) i 1 i , '0 3 ,
L L L •— L — L — L — L t0 r' N, 'O'— `•'•I N L — L — C — L O 0 p
•
Z -. .TO, =, � _ z _ .i — H1' 3 -•C\ 3 ; 721 00 I. 0 3 � ren CA
>,. >, CO p
U. >, : z O
T Coc ' ct 'O ^ o
L 3 nj 0 y. T 5' 0 0
CC) a) 3 L ? J cs v' 0' L° ^tT' as tea:
z
0 a) a) X a
Z 3 Z 375 0 0
z 3 0 O 0 0
c — 0. 0 Z > — P >;
`r 3 Z 0 o Co co c�
C .^. % 0 5 Q O L ta`.: G
ai
U z— z soU =0 °U
U o . •� a, r X , ,'1 ca > >a
o 0 0 0 0 o o o o o o o o o v
SQ0 0 0 0 0 0 0 0' 0 0 0 0 0 —
O O O O O O O O O o 0 O O O
0 0 0 0 0 0 0 0 0 0 0 o O' o
0 S 0 0 0 0 0 0 0 0 00 0 0 0
o0 o O O• O N N O\' t c O, M
O O 0 0 0 0 V' kr, l�- 7 N
0`, 0 VO G, N �' N Cl, CC 7 69 N00 N
690' VO N 69 C.) 69 _ 69. 69 b9 EA 69
643 EA' 69 69 ,
EA' •
I
.
M L V1
.- L,�''. I .O M C3 7 •^ N •` > i 0 M = 0 M C U N
o N " � —• ,� � V N' > 01 ^ re) C7 -= CO � fi en
M O M T M ^ N -1 M O O J O M N L O O
G1 U
> c
L.
E- � � � � r1 .c = ° iii '= c r .^o 3 ^ �
E oo m Gi ° — < z cc v� a) } LU �, v). L H b yr,
Q
C/)
• Z ! ~..
I
mnimmi N MC
CZ CZ c3 cG
Cep > O O
OO
C7 _ 0.
J Ca.
Z L1'
J z
_
r--.1CM Ca • —r' _ -
CS CS ca CC c.:•• r =
■— QCa Q Q, -O' -0 O O -0 O O r -0 'O O O O O w
CCo wGJ. Cf UJ. fl'I. II. •
l. L rr ?.
f ?.
Z
_ O.•
Vi•o •o. o o o i ^ o 0 0
�
® -6 O - -O O - -o O j O 'a - - .a, u.
= •
N ca U, R — ca ca c U! U r c3 :3 Cy'
WW C.1Ca -'0 CO CO U '0 - CO CO c.,.., iTi
U. > > U > > U' V > > > >
- - °C > O 0 n, 0 0 L ce i - O 0 0 O iii
Fs w ✓ > > r✓ N c > > N :.
O: O r vr r
rr-
CN ;! OL V. s C L L ..0 -
tn
0
0
I.)
=
0 0 0 0
i iii
'
>, >, 1 >, >, _>, >, >, rwr)
C) U U U U V O O O 0 0 0 0 V
-Y -Y o Ca o C Ca 0 0
Oc ^ C' ^ � ^ ^_ � ^_ o ^ o ^_ c;' V0 ^ 0 ^ ^ o o o'cco,o cM. cO cG N CG CG O OG • CCo G O 0 O. Fa @
s7
OrM U - U U — U — U — U — U - UON O C1 U — -- U Q, U01 >
CL CD L 0 L 00 L OG L OO L OO L OG L CXLOG L OG LOCL OG yOO
C) 0 O O 7 0 = 0 7 0 O 0 = 0 O 0 O 0 3 0 O O. O 0 = 0 ...
- — -.- \ - a� �--� —. 0 -L �--� — ' -..i -.. — .6,
V)
C� Z
0 O,
C3 " ccaa .'' , .4
v
N y °L'.i ca V
'7 r Z •. :t = a). C3 C/)
T CZ
N r O 'O X X ice"ii c-' 6Xi r, r
C 4) L� c3
L" U rr•, CO ..p — 0 u r ` ^rte•
_ T.
�
0 .-yi a)
L U L CO
0 ,0
COCa m
til
T.
Ez. �° ' .�' v m Ea' 3 Cis = O I
1
QIUFUR. Earprises, Inc.
DISASTER RESPONSE DIVISION
Current Standby Contracts
Municipality State Expiration Date
Charlotte County Florida 12/31/19
City of Rockledge Florida 3/1/20
Miami-Dade County Florida 3/31/19
Lee County Florida 6/1/19
South Broward Drainage Florida 6/30/18
Broward County v Florida 6/22/20
Escambia County Florida 8/6/18
FLDOT District 01 (Cut&Toss) Florida 7/06/18
FLDOT District 01 Florida 7/06/18
FLDOT District 02 Florida 9/22/18
FLDOT District 03 Florida 7/14/18
FLDOT District 04 Florida 10/15/18
FLDOT District 05 Florida 6/30/18
FLDOT District 07 Florida 8/15/18
City of West Park Florida 6/1/19
City of Cape Coral Florida 6/15/20
City of Homestead Florida 8/17/18
City of Port St Lucie Florida 8/2/20
Seminole Tribe of Florida Florida 8/9/20
City of Plantation Florida 6/1/22
City of Miami Florida 8/19/18
Lake County Florida 4/16/19
4111
411
15
•
,6F STATE OF FLORIDA
;>TX�= - ';\ DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
t,4...--:•--;•••t..
40,
CONSTRUCTION INDUSTRY LICENSING BOARD (850) 487-1395
® •``�ooEld`'` 2601 BLAIR STONE ROAD
TALLAHASSEE FL 32399-0783
FUZZELL, ROBERT HUNTER
T.F.R., INC. OF TEXAS
601 LEANDER DR •
LEANDER TX 78641
Congratulations! With this license you become one of the nearly1. r•-' �; J~ 1
one million Floridians licensed by the Department of Business and - _- - - --`- - - - —
Professional Regulation. Our professionals and businesses range i --STATE OF FLORIDA - i
from architects to yacht brokers,from boxers to barbeque . - ;;'_DEPARTMENT OF;BUSINESS AND"-- _ I
restaurants,and they keep Florida's economy strong. `=';.:PROFESSIONAL-REGULATION-. - _
Wit`-�-, - ".';:•'•i •- _.)._; ,; ..
Every day we work to improve the way we do business in order ' - CRC1331035 �4•' ISS.UED '"08/04/20.1,6-
to serve you better. For information about our services, please �� --+4.?-.:.; -r-,:=--`.*--,- -1::-. .4 -- ;
Ifg onto www.myfloridalicense.com. There you can find more CERTIFIED'RESIDENTIAL CONTRACTOR
formation about our divisions and the regulations that impact y-FUZZELL•ROBERT HUNTER�hi4
ou,subscribe to department newsletters and learn more about =T FF.R-.INC.OFaTEXAS-'M�,,_.'cc. " -- • I
the Department's initiatives. -i,_-----2.2 - r s"°e -- • - -_'
Our mission at the Department is: License Efficiently, Regulate - J��'�}r a .= _-.
Fairly.We constantly strive to serve you better so that you can /-2.--;------------,_.'7-------=------ -- _ •
-
serve your customers. Thank you for doing business in Florida, IS CHER IIFIEDunder-the-provisons of Ch,489:FS. ^Z
and congratulations on your new license! ��---�Eniiriration date,;AUG 31{2618-7.7:_----1-----L16080406.01603-
1
DETACH HERE
RICK SCOTT, GOVERNOR KEN LAWSON,SECRETARY
:. - -: STATE OF FLORIDA a, _-. . • '
- t _DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION ,.;e< N ,
�' E f- --- ..-__CONSTRUCTION:INDUSTRY.LICENSING:BOARD r
•,_ - – -:1":-7,:::1 yam-,. N- •-' -�`. • _`�n i, ' ��
LICENSE NUMBER I
•rhe r`ISt'. 1
V-CRC1331035,f r ' - n'Li-1'4' `-,��' -`�\� <,`C • ,, .7 -, e. \`i
' The,RESIDENTIAL_CONTRACTOR - '',`"'-` -- �Ns-\��` \` •'N,N �7 s�, `jr
,:.Narned below-IS-CERTIFIED- �_ -.--:•-'�`'�'-Vic-: .' � "\-, -'tti.,�'\\N '► - --Ii,-;". ��
--Under•'the.provisionspf Chapter:_489'FS._'=— 'T_'= ' - -� ----,,,..„ 1"---.� _'N \ • ,
:Expiration'date AUG=31:2018 ,� �:1 \ �V.�.`� �\.\.--��y- �i
may / - .-...`�— —. 7-" /-� ` <.��v `? \- - '",-,\,..\\*.a' --,..--% qel
E/,',>";: -L;ROBERT HUNTE ._;------7-'"--. '` � ` '•, 's.• �\�`'`.- N- w%�' .r_:. :L L .
%7_-F1:2--*INC-OF. ., •TEXAS- ,;L,�`s,. ----'-'\--''''' N� -� �,•._ `• '�.` N
y601.LEANDER•DR--- , `" - - ----7-----,....„7-c'----4-9 . ,_' a''.\ �f 1;:4-7.9'4.... t `.I
ry :EAN_DER- <.. `T,X 78641 e ti \;'.� s �t
�' a o. 1,1
.Z,.-,-��,..•--.<2;::,-----7":" ._- ? . Z-, . .Q-4 .� `i '"s1.-4.1--'-'-‘N r t'•-• t`�` �1— • '' \I.'.1•. ,` -% \ \ .
�,.. �. 1� �. 1 . �5
ISSUED: 08/04/2016 DISPLAY AS REQUIRED BY LAW SEQ# L1608040001603
2018 FOREIGN PROFIT CORPORATION ANNUAL REPORT FILED
DOCUMENT# F02000004640 Jan 15, 2018
Entity Name: T.F.R., INC. OF TEXAS Secretary of State
CC4836342045
Current Principal Place of Business:
601 LEANDER DR
LEANDER, TX 78641
Current Mailing Address:
601 LEANDER DR
LEANDER, TX 78641
FEI Number: 72-1149862 Certificate of Status Desired: No
Name and Address of Current Registered Agent:
CORPORATION SERVICE COMPANY
1201 HAYS STREET
TALLAHASSEE,FL 32301-2525 US
The above named entity submits this statement for the purpose of changing its registered office or registered agent,or both,in the State of Florida.
SIGNATURE:
Electronic Signature of Registered Agent Date
Officer/Director Detail :
Title CP Title S
Name ROWLAND,TIPTON F Name ROWLAND,JULIE
Address 12408 CEDAR ST Address 12408 CEDAR ST.
City-State-Zip: AUSTIN TX 78732 City-State-Zip: AUSTIN TX 78732
411
I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under
oath;that lam an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607,Florida Statutes;and that my name appears
above,or on an attachment with all other like empowered.
SIGNATURE:JULIE ROWLAND SECRETARY 01/15/2018
Electronic Signature of Signing Officer/Director Detail Date
BALDWIN • Commercial Insurance
C COX •Construction Bonds
• Employee Ba
ALLEN - Personal Insurance411
Insurance & Construction Bonds
May 9, 2018
City of Sunny Isles Beach
18070 Collins Ave
Sunny Isles Beach, FL 33160
RE: TFR Enterprises, Inc— Bonding Capacity
To Whom It May Concern:
We have the pleasure of bonding TFR Enterprises, Inc (TFR) and can highly recommend this
fine contractor to you. We feel they are a well-managed company with a history of completing
their projects on time and within budget. The bonding capacity for TFR is in the range of$25
million single and $50 million aggregate. The current bonding company is Westchester Fire
Insurance Company which is an A++ rated and Treasury Listed surety.
Our understanding is that TFR is being considered for projects on your behalf. Subject to the job
being within the single and aggregate limits, normal review of the contract terms and conditions,
confirmation of construction financing in the full amount of the contract, and any related
4111 underwriting items at the time of the request, we fully anticipate being able to provide the
performance and payment bonds as required for your project.
This letter is offered as an indication of TFR's past experience and our confidence in the firm,
and not to be construed as an agreement to provide surety bonds. Please be aware that the
execution of payment & performance bonds is subject to the positive review of all normal
underwriting considerations at the time of the request. Any specific request for bonds will be
underwritten on its own merits and any arrangement for bonds required by any contract is a
matter between the contractor and the surety and we assume no liability to you or your third
parties, if for any reason we do not execute these bonds. Bonds will be provided when the
project/task order in question is agreeable to both parties and proper contracts are in place.
Again, we can highly recommend TFR to you. Feel free to contact me at 972-331-3709 should
you have any questions about our fine client.
Best Regards,
Brock Baldwin
Principal
Baldwin Cox Allen
P 972.644.2688 5930 Preston View Blvd. Ste. 200, Dallas, TX 75240 F 972.644.8035
WWW . BALDWINAGENCY . COM
raj
T.Q.R. Eiitorprises, IHC.
®
DISASTER RESPONSE DIVISION
4111/
Training and Certifications
TFR's disaster response team includes a variety of skills and certifications including
NIMS Certification, Safety Certifications (OSHA), Quality Control, and Environmental
Certifications.
Course No. Course Name Course No. Course Name
IS-00001 Emergency Manager IS-00909 Community Preparedness
IS-00005 An Introduction to Hazardous FLDOT Approved Maintenance of
Materials _ Traffic, Advanced
IS-00020 Diversity Awareness Course FMCSA Development of DOT-
2016 Required Safety Management
Controls
IS-00035 FEMA Safety Orientation • GHC#TS 10 Individual and Public
Assistance
IS-00100 Introduction to Incident • GHC#TS28 Lake County and State
Command System _ Logistic Response Center
IS-00200 ICS for Single Resources and TEEX 16-Hour Work Zone Traffic
Initial Action Incident Control
IS-00212 Introduction to Unified Hazard TEEX 4-Hour Train-the-Trainer
— Mitigation Flaggers
® IS-00632 Introduction to Debris TXDPS Debris Management
Operations #G202.
IS-00634 Introduction to FEMA's Public TXDPS Management of Spontaneous
Assistance Program Volunteers in a Disaster
IS-00700 NIMS (An Introduction) Fred Pryor Project Management
Workshop 6-Hour
IS-00800 National Response Framework • USACE Construction Quality
Management for Contractors
IS-00906 Basic Workplace Security USACE 30-Hour Construction Safety
Awareness
IS-00907 Active Shooter: What You Can GHC#G202 TS 10. Debris Management
Do _
GC Licenses Alabama#50551
Arkansas#0341960518
Louisiana#59763
Mississippi#21154-SC
Tennessee#69209
Florida#CRC1331035
P'GO Mph 111 41 J
(fOSHA'
o ,,, ;ills: 1
Z6 i SAFETY FIRST 1
��dwoUSACE
16
T.f.R. Enterpvises, Inc.
s
® DISASTER RESPONSE DIVISION
References
Over the course of business, TFR has partnered and worked for countless federal, state and local
governments to provide debris removal and management services. Through these projects, TFR
has enjoyed a fruitful, productive relationship with each client. In the end, we understand that
TFR sells a service. If we do not satisfy the needs and desires of our client, TFR cannot continue
to grow and prosper. Remembering this, TFR strives for perfection in quality, ensures an
expedient response and completes the job on time, every time.
City of Homestead,Florida
Mr. Dennis Maytan, Director of Public Works
100 Civic Court
Homestead,Florida,33030
P:(305)224-4842
E: dmaytan@cityofhomestead.com
Contract Term:09/2017-01/2018
Contract Amount: Approximately$3,500,000.00
Description of Work: Performed debris removal,reduction,and disposal services resulting from Hurricane Irma(estimated
155,000cy)
2. Miami-Dade County, Florida
Ms.Jennyfer Calderon,Procurement Contracting Officer
I I I NW I st Street, Suite 1300
Miami, Florida 33128
P:(305)375-5312
E: Jennyfer.calderon@miamidade.gov
Contract Term: 09/2017-Current
Contract Amount: Approximately$4,000,000.00 to Date
Description of Work: Performed debris removal and reduction services resulting from Hurricane Irma(hauled 250,000cy and
4111
reduced 500,000cy)
3. City of Plantation, Florida
Mr. Steve Rodgers,Assistant Director of Public Works
400 NW 73rd Avenue
Plantation,FL 33317
P:(954)452-2535
E: srodgers@plantation.org
Contract Term: 09/2017-12/2017
Contract Amount: Approximately$7,391,432.00
Description of Work: Performed debris removal services resulting from Hurricane Irma(estimated 500,000cy)
4. Bastrop County,Texas
Mr. Ronnie Moore-P.E.
806 Water Street, Bastrop,Texas 78602
P:(512)779-9926
E:ronnie@cbdeng.com
Contract Term: 09/2011-09/2012
Contract Amount: Approximately$13,100,000.00
Description of Work: Performed debris removal,reduction,and disposal services resulting from 2011 Wildfires(estimated
700,000cy)
5. Fort Bend County,Texas
Mr. Scott Wieghat,Road and Bridge Special Projects Coordinator
PO BOX 148, Richmond,TX 77406
P:(281)238-3607
E:scott.wieghat@fortbendcountytx.gov •
Contract Term:09/2008-12/2008
Contract Amount: Approximately$10,000,000.00
/� Description of Work: Performed debris removal,reduction,and disposal services resulting from Hurricane Ike(estimated
800,000cy,plus 200,000 cy Sugarland interlocal)
17
T.F.R. Eorprises, lc.
s
DISASTER RESPONSE DIVISION
Tipton F. Rowland
Chief Executive Officer
Mr. Rowland acquired his grandfather's company (Robinson Key Expertise
& Son Tree Service, Memphis. TN) in 1988 and incorporated o Executive
the company as TFR Enterprises, Inc. in 1989. A disaster Management
•
services division was added in 1992 to include, debris Field Operations and
Logistics
management following a disaster event such as hurricanes, • Debris Management
floods, ice storms, tornados and earthquakes. Projects that o Hazardous Tree
have been undertaken and successfully completed under his Removal
• ROE Programs
supervision include vegetative and C&D debris removal from • Beach Remediation
Rights-Of-Way, vegetative and C&D debris removal from • Waterway Cleanup
streams and canals, Temporary Debris Storage and Reduction
Site (TDSRS) management, weed and brush control services, Training&
tree pruning, trimming and removal services, mulch and Certifications
compost production services, vegetative debris incineration • IS-00700
(both open bum and air curtain), vegetative reduction by
grinding, separation and recycling of C&D debris and Recent Disaster
demolition of residential structures. Mr. Rowland has Experience
overseen 150+ separate disaster response projects, federally • Hurricane Irma
® funded by the Federal Emergency Management Agency • Hurricane Harvey
(FEMA). By providing "hands-on" oversight as President and • 4283 Hurricane
Chief Executive Officer of TFR Enterprises, Inc. he has Matthew
• 4280 Hurricane
successfully performed as damage assessment evaluator, cost Hermine
proposal estimator, project supervisor, safety and compliance • 4277 Louisiana
officer, and has assisted in interacting with local government Floods
• 4245 Texas Floods
officials in developing debris management policies in 0 4211 Tennessee Ice
compliance with State and Federal (FEMA) reimbursement Storm
regulations. • 4167 North Carolina
Ice Storm
• 4166 South Carolina
Ice Storm
• 4145 Colorado Floods
• 4117 Oklahoma
Tornado
• 4115 South Dakota
Ice Storm
• 4100 Arkansas Ice
Storm
• 4086 Hurricane Sandy
• 4064 Oklahoma
Tornado
• 4029 Texas Wildfires
® • 4034 Hurricane Irene
• 1917 Oklahoma
Tornado
• 1875 Maryland Snow
Storm
18
QJ.FUHIEntrprises, Inc.
DISASTER RESPONSE DIVISION
Julie Rowland
Chief Financial Officer
Mrs. Rowland is responsible for all fiscal functions of the Key Expertise
corporation. With extensive knowledge of the company ° Executive
business model, assists and advises CEO with all financial Management
decisions. Involved in planning, developing, organizing, • Financial Planning
o Financial Records
implementing, directing and evaluating the organizations o Strategic Planning
fiscal functions and performances. Maintains all current o Risk Management
banking relationships as well as explores new banking
opportunities. Works closely with corporate CPA to
provide financial reporting obligations in a timely manner. Education
Direct supervisor to accounts payable, accounts receivable • University of
and all bookkeeping aspects of the company. Responsible Memphis,Bachelor of
for the financial aspects of all company transactions Arts Communications
including real estate and equipment purchases and sales,
contracts and leases. Ensures and maintains all financial Recent Disaster
records. Has successfully handled the financial perspective Experience
for over 150 emergency disasters in the past 27 years. • Hurricane Irma
o Hurricane Harvey
• 4283 Hurricane
Matthew
® o 4280 Hurricane
Hermine
o 4277 Louisiana
Floods
o 4245 Texas Floods
o 4211 Tennessee Ice
Storm
• 4167 North Carolina
Ice Storm
• 4166 South Carolina
Ice Storm
• 4145 Colorado Floods
• 4117 Oklahoma
Tornado
o 4115 South Dakota
Ice Storm
• 4100 Arkansas Ice
Storm
• 4086 Hurricane Sandy
o 4064 Oklahoma
Tornado
• 4029 Texas Wildfires
• 4034 Hurricane Irene
• 1917 Oklahoma
Tornado
• 1875 Maryland Snow
® Storm
19
QJ.F.H. EInc.
DISASTER RESPONSE DIVISION
Ronnie Moore, P.E.
Operations Manager
Mr. Moore has worked for the Texas Department of Key Expertise
Transportation (TXDOT) in the Bridge Design Division as • Field Operations and
a designer, and in the Aviation Division as a project Logistics
manager. He also has extensive experience in the private ° Debris Management
•
sector as a design engineer for multi-million-dollar mixed- Hazardous Tree
Removal
use land development projects as well as roadways, o ROE Programs
drainage and utilities, and as a senior project manager for o Beach Remediation
the same types of projects. • Waterway Cleanup
Mr. Moore was the Bastrop County Engineer at the time of Education
the Bastrop Complex Wildfire, which started September 4,
2011 and was not declared extinguished until Oct. 9, 2011. a University of Texas,
Bachelor of Science-
This fire was the most destructive Wildland-Urban Civil Engineering
Interface fire in the history of Texas. The fire burned
rapidly out of control, scorching 32,400 acres, destroying
1,723 residential and commercial structures, torching an Recent Disaster
estimated 1.5 million loblolly pine trees, and claiming the Experience
lives of two people. • 4283 Hurricane
Matthew
•Mr. Moore was in charge of the debris removal operations • 4280 HurricaneHermine
during Bastrop County's recovery. The entire burn scar of • 4277 Louisiana
this fire is in the critical habitat of a federally listed Floods
endangered species. Therefore, Mr. Moore worked • 4245 Texas Floods
together with U.S. Fish and Wildlife (FISH), FEMA, and ° 4211 Tennessee Ice
the Texas Division of Emergency Management (TDEM) to Storm
417
ensure that all requirements of the Stafford Act, the ° Ice S North Carolina
Ice Storm
Endangered Species Act (ESA) as well as FEMA and State • 4166 South Carolina
requirements were adhered to during the debris removal Ice Storm
portion of the recovery effort. Bastrop County's debris • 4145 Colorado Floods
removal program has come to be considered a model • 4117 Oklahoma
program for post fire debris removal. Ronnie Moore has Tornado
been a featured speaker on Debris Removal and adherence • 4115 South Dakota
Ice Storm
to governmental regulations during the debris removal • 4100 Arkansas Ice
operation, at both the TDEM annual conference, and the Storm
Capital Area Council of Governments (CAPCOG) • 4086 Hurricane Sandy
workshops for municipal and county Emergency • 4064 Oklahoma
Management personnel. Tornado
• 4029 Texas Wildfires
General Contractors License Qualifier for the following:
Louisiana#59763
20
Qi.F.R. Enr rises, Inc.pDISASTER RESPONSE DIVISION
Dennis Sissell
Environmental and Safety Manager
Mr. Sissell has been in the hazardous materials containment, Key Expertise
response and cleanup services industry since 1980. He has • Hazardous Waste
responded to various hazardous materials cleaning/removal o Safety
and spill cleanup projects in mills and refineries such as • Training
Armco Steel, Shell, DuPont, Phillips and Hymont and several • Traffic Control
Municipal Solid Waste Treatment facilities. His Hazmat o Waterway Cleanup
background includes training in containment, cleaning and •
disposal. Mr. Sissell is also DOT certified in handling, Training&
packaging, and shipping of Hazardous Materials. He Certifications
provides a knowledgeable and professional approach to the o Florida DOT(MOT)
environmental and safety issues involved in the collecting, Advanced Course
handling and disposal of Hazmat materials during the debris • Handling and
removal process. Transportation of
Hazardous Chemical
Materials
Recent Disaster
Experience
• Hurricane Irma
® • 4283 Hurricane
Matthew
• 4280 Hurricane
Hermine
o 4277 Louisiana
Floods
o 4245 Texas Floods
o 4211 Tennessee Ice
Storm
o 4167 North Carolina
Ice Storm
o 4166 South Carolina
Ice Storm
• 4145 Colorado Floods
• 4117 Oklahoma
Tornado
• 4115 South Dakota
Ice Storm
• 4100 Arkansas Ice
Storm
• 4086 Hurricane Sandy
• 4064 Oklahoma
Tornado
1111
21
QI.F.11. Eorp rises, loc.
DISASTER RESPONSE DIVISION
4111) Sharon Lyell
Project Manager/Quality Control Manager
•
Key Expertise
Mrs. Lyell is responsible for corporate quality control ° Quality Control/
procedures, measures, inspections, documentation, Quality Assurance
corrective. actions and process improvements. Also, ° Contract Compliance
• Data Reconciliation
oversees training personnel on operational and safety o Project Management
procedures. • Scheduling
• Sub-Contractor
Mrs. Lyell is responsible for contract compliance and data Compliance
accuracy on all FEMA funded projects from initial review
of contract, throughout operations to final completion Training&
including ticket data management, invoicing, sub-contract Certifications
compliance and payments, inspections and daily reporting, • FMCSA: DOT
damage claim tracking and resolution. Required Safety
Management Controls
Project Administrator, responsible for human resources, ° FMCSA: Supervisor
Drug and Alcohol
equipment resources, job scheduling, and sub-contractor Training
compliance and job cost accuracy and contract and • Project Management
environmental compliance (TDRS permitting) on all Workshop 6-Hour
40 projects
Education
Cross-trained in all aspects of accounting from multi-state • Austin Community
certified payroll, payroll tax filings, accounts payable, College, Computer
receivable, invoicing, financial statement reviews, job Science
profit analysis and fleet management/disposition • Bryan Institute,
Computer Technology
• • Austin School of Real
Estate, Loan Officer
Recent Disaster
Experience
• Hurricane Irma
• 4283 Hurricane
Matthew
• 4280 Hurricane
Hermine
• 4277 Louisiana
Floods
• 4245 Texas Floods
• 4211 Tennessee Ice
Storm
• 4167 North Carolina
Ice Storm
• 4166 South Carolina
Ice Storm
• 4145 Colorado Floods
• 4117 Oklahoma
Tornado
22
T.F.R. Eorprises, Inc.
®
DISASTER RESPONSE DIVISION
Tiffany Wilkes
Contract Administrator/Quality Control
Key Expertise
Ms. Wilkes has provided contract administration, quality o Contract Compliance
control, quality assurance, and project management to o FEMA Compliance
debris removal projects since 2008. Ms. Wilkes is • Project Management
responsible for bid and contract documentation and ° Quality Control/
management. She has also served as quality control and Quality Assurance
project manager during Hurricane Sandy and the
devastating tornado that impacted Norman Oklahoma in Training &
2013. In conjunction with securing more than 50 pre- Certifications
position contracts, Ms. Wilkes played a vital role in o USACE: Construction
securing two (ACI) Single Award Task Order Contracts Quality Management
for Contractors
(SATOC) for Debris Management Services with the • FMCSA: DOT
USACE that allows for ordering up to $580 Million dollars Required Safety
per contract. Management Controls
• FMCSA: Supervisor
Drug and Alcohol
General Contractors License Qualifier for the following: Training
Alabama#50551 • Project Management
Arkansas #0341960517 Workshop 6-Hour
Mississippi #21154-SC • TS 10 Debris Mgmt.
Tennessee#69209 • IS-00001
• IS-00035.15
• IS-0005
• IS-00100
• IS-00200
• IS-00800
• IS-00906
• IS-00907
• IS-00909
Education
• Texas A&M
University,Bachelor
of Arts-History
Recent Disaster
Experience
• 4283 Hurricane
Matthew
• 4280 Hurricane
Hermine
• 4277 Louisiana
Floods
• 4245 Texas Floods
• 4211 Tennessee Ice
Storm
• 4167 North Carolina
Ice Storm 23
QIUF.OI EeterQ rises, bc.
DISASTER RESPONSE DIVISION
Kevin Rolison
Senior Project Manager
Mr. Rolison has over 15 years experience in the disaster Key Expertise
debris management industry and over 25 years experience in • Field Operations and
heavy-equipment, including knucklebooms, heavy haulers, Logistics
self-loaders and grinders. Mr. Rolison came to TFR ° Debris Management
Enterprises in 2001 as a CDL; Class A Driver working on ° Hazardous Tree
storm related projects in Virginia. In 2004, Mr. Rolison Removal
served our company as a project manager on various projects • ROE Programs
resulting from Hurricanes Charley, Fran, Jeanne and Ivan in ° Beach Remediation
• Waterway Cleanup
the State of Florida. He continued as a Project and Site
Manager in 2005 and 2006 on jobs in Louisiana and Texas
resulting from Hurricanes Katrina and Rita. With his strong Training&
work ethic and leadership, he was quickly promoted to Senior Certifications
Project Manager. • USACE: 30 Hour
Construction Safety
Prior to coming to TFR Enterprises, Mr. Rolison owned and ° Florida DOT(MOT)
operated his own hauling business, Rolison Trucking, Inc. In Advanced Course
• Project Management
addition to his current role, Mr. Rolison has extensive Workshop 6-Hour
knowledge of the maintenance and logistics of debris removal ° ATSSA: Certified
equipment, including Sterling Self-Loaders and Flagger
knucklebooms and Diamond Z Grinders. o IS-00035.16
• IS-00020.16
Recent Disaster
Experience
• Hurricane Irma
o 4283 Hurricane
Matthew
• 4280 Hurricane
Hermine
• 4277 Louisiana
Floods
o 4245 Texas Floods
• 4211 Tennessee Ice
Storm
• 4167 North Carolina
Ice Storm
• 4166 South Carolina
Ice Storm
• 4145 Colorado Floods
• 4117 Oklahoma
Tornado
• 4115 South Dakota
Ice Storm
• 4100 Arkansas Ice
Storm
• 4086 Hurricane Sandy
• 4064 Oklahoma
Tornado
• 4029 Texas Wildfirq4
QIFI Eloc.
DISASTER RESPONSE DIVISION
Jennifer Frankovsky
Director of Business Development
Mrs. Frankovsky is responsible for leading the TFR Key Expertise
marketing directive to support current and future client • FEMA Compliance
relationships. Act as client liaison during disaster ° Marketing
situations. Act as Operations Manager, overseeing disaster ° Business
teams during disaster operations. Train disaster field Development
• Project Management
personnel on scope of work and FEMA compliance. She is
o Training
a managing member of the TFR FEMA Compliance Team.
Additional responsibilities include FEMA field
compliance, mobilization and site logistics, contract Training&
negotiations, client presentations, and training and project
Certifications
management. Direct the Fleet Department. Manage TFR's ° Texas DPS: Debris
Management
conference initiative, representing TFR at conferences and ° Texas DPS:
trade shows. Management of
Spontaneous
Volunteers in
Disasters
o GHC: Individual and
Public Assistance
• GHC: Lake County
and State Logistic
Response Center
• IS-00035
• IS-00100
• IS-00200
• IS-00212
• IS-00634
• IS-00632
• IS-00700
• IS-00800
Recent Disaster
Experience
e 4283 Hurricane
Matthew
• 4280 Hurricane
Hermine
• 4277 Louisiana
Floods
• 4245 Texas Floods
• 4211 Tennessee Ice
Storm
• 4167 North Carolina
Ice Storm
• 4166 South Carolina
® Ice Storm
• 4145 Colorado Floods
• 4117 Oklahoma
Tornado
25
QJ.F.H. Enr risns, Inc.
Q
® DISASTER RESPONSE DIVISION
Rigo Mejia
Project Manager/Site Manager
Rigo began his employment with TFR Enterprises, Inc. in 2008 Key Expertise
as an equipment operator. He quickly became an expert as a tub o Field Operations and
grinder operator; working with Diamond Z 1463B and 1352BL Logistics
tub grinders. He has managed TFR tub grinding operations for • Debris Management
multiple disaster jobs, grinding as much as 800 cubic yards of o Grinding Operations
debris an hour. In 2014, TFR purchased two new Diamond Z • Site Operations
4000TK horizontal grinders. He became efficient with operating
the horizontal grinders as well, grinding up to 120 tons of debris Training &
an hour. As a proven leader in the tub-grinding department he Certifications
became the Senior Project Manager of the Grinding Division. o Florida DOT(MOT)
Advanced Course
o ATSSA: Certified
Flagger
Recent Disaster
Experience
o Hurricane Irma
o 4283 Hurricane
Matthew
O 4280 Hurricane
® Hermine
o 4277 Louisiana
Floods
o 4245 Texas Floods
• 4211 Tennessee Ice
Storm
o 4167 North Carolina
Ice Storm
o 4166 South Carolina
Ice Storm
• 4145 Colorado Floods
• 4117 Oklahoma
Tornado
• 4115 South Dakota
Ice Storm
• 4100 Arkansas Ice
Storm
• 4086 Hurricane Sandy
• 4064 Oklahoma
Tornado
• 4029 Texas Wildfires
• 4034 Hurricane Irene
• 1917 Oklahoma
Tornado
• 1875 Maryland Snow
411 Storm
26
�T.�.R. Eiitorprses, lac.
® DISASTER RESPONSE DIVISION
FEMA Familiarity
TFR possesses an intimate understanding of the FEMA funding and reimbursement
process. ALL TFR CLIENTS HAVE RECEIVED 100% OF THEIR ELIGIBLE
REIMBURSEMENT. TFR HAS NEVER HAD A SINGLE DOLLAR
DEOBLIGATED BY FEMA or the FHWA. We understand that our client's
reimbursement is directly correlated to their ability to pay TFR and we work with our
clients to ensure this process is as fast and efficient at possible. Due to the sliding
reimbursement scale implemented by the Hurricane Sandy Recovery Act of 2013, TFR
also understands that the faster we complete the job, the greater the financial burden
assumed by FEMA. TFR is willing to do whatever it takes to maximize your
reimbursement.
TFR personnel have conducted over 150+ federally funded projects, and as such, has
gained invaluable experience and familiarity with the FEMA recording and
reimbursement process conducted under the federal Public Assistance Program. With no
turnover in our key personnel for the past five (5) years, our employees have been
working as a cohesive team to confront FEMA issues and ensure the reimbursement of our
clients for 28 years. Jennifer Frankovsky, our Director of Business Development, in
conjunction with Tiffany Wilkes, Contract Compliance and Reconciliation Administrator,
head our FEMA Compliance Team in any and all disaster-related projects. Our FEMA
Compliance Team is deeply vetted in FEMA management and operational styles, and
NEVER has TFR, or its officers, had a disputed claim for FEMA reimbursement. These
® individuals are very familiar with and aware of the federal guidelines for independence in
accountability and reporting as well as recognizing that it cannot perform or assume the
sovereign duties of the government officials. However, this does not preclude TFR from
offering the following services to aid our clients in complying with the federal Public
Assistance Program while seeking additional funding and grants for various Permanent
Works Projects:
• Provide extensive pre-event training sessions with review of previous submitted
FEMA paperwork
• Design appropriate cost tracking systems before approval of Project Worksheets
is received
• Assist our client in estimation of debris volumes by debris types and debris
management costs for Preliminary Damage Assessments
• Provide, review and confirm accuracy of supporting documentation (i.e. Truck
Certifications, Load Tickets, Equipment Time Sheets, etc.) for the Project
Worksheets to realize full reimbursement
27
��.�.R. Eorprisos, bc.
® DISASTER RESPONSE DIVISION
Project Understanding and Technical Approach
TFR Enterprises, Inc. Overview
• TFR Enterprises, Inc. is a debris removal contractor, first incorporated in 1989 in the
State of Tennessee, and actively participating in disaster recovery contracts nationwide
since Hurricane Andrew in 1992.
• May 2014, TFR was awarded two (5) year Advance Contracting Initiative (ACI) Single
. Award Task Order Contracts (SATOC) for Debris Management Services within the
Southwestern and South Pacific Divisions under the USACE.
• TFR has successfully completed more than 150 disaster projects and all our clients have
received 100% of their eligible reimbursement.
• TFR has NEVER defaulted on a contract, nor has any regulatory or license agency
sanctions been imposed.
• TFR owns more than 150 pieces of equipment that is primarily designed for use in
debris removal operations.
• In August 2016, TFR responded to the flooding that impacted Louisiana and
successfully completed debris hauling in District 61, District 3, and Iberia Parish
simultaneously.
• In 2017 Texas, Florida, and Puerto Rico were devastated by the crippling Hurricane
Season. TFR successfully managed and completed 21 projects simultaneously.
• During Hurricane Ike, TFR supplied crews to assist the USACE contractor with the task
of opening up Interstate Highway 45 between Houston and Galveston and the Galveston
Beach Road 3005 so that other contractor and rescue/recovery crews could access the
damaged area. This assistance was provided in addition to TFR's response and
performance to 6 of its own prime contracts (which included two counties) removing in
excess of 1,800,000 cubic yards of debris.
• The 2005 Hurricane Season, which saw major damages from Hurricanes Dennis,
Katrina, Rita and Wilma, resulted in TFR handling 6,000,000 cubic yards of debris
within 180 days.
• Federal Employer Identification Number: 72-1149862
• DUNS Number: 08-1346561
• E-Verify Number: 303767
• Single Project Bonding Capacity: $50,000,000
28
Enr rises, Inc.
QIUFUHI. p
DISASTER RESPONSE DIVISION
FEMA Compliance Team
TFR personnel have conducted over 150+ federally funded projects, and as such, has gained
invaluable experience and familiarity with the FEMA recording and reimbursement process
conducted under the federal Public Assistance Program. With no turnover in our key
personnel for the past five (5) years, our employees have been working as a cohesive team
to confront FEMA issues and ensure the reimbursement of our clients for 28 years. Jennifer
Frankovsky, our Director of Business Development, in conjunction with Tiffany Wilkes,
Contract Compliance and Reconciliation Administrator, head our FEMA Compliance Team
in any and all disaster-related projects. Our FEMA Compliance Team is deeply vetted in
FEMA management and operational styles, and NEVER has TFR, or its officers, had a
disputed claim for FEMA reimbursement. These individuals are very familiar with and
aware of the federal guidelines for independence in accountability and reporting as well as
recognizing that it cannot perform or assume the sovereign duties of the government
officials. However, this does not preclude TFR from offering the following services to aid
our clients in complying with the federal Public Assistance Program while seeking
additional funding and grants for various Permanent Works Projects:
• Provide extensive pre-event training sessions with review of previous submitted
FEMA paperwork
• Design appropriate cost tracking systems before approval of Project Worksheets is
received
• Assist our client in estimation of debris volumes by debris types and debris
® management costs for Preliminary Damage Assessments
® • Provide, review and confirm accuracy of supporting documentation (i.e. Truck
Certifications, Load Tickets, Equipment Time Sheets, etc.) for the Project
Worksheets to realize full reimbursement
Emergency Response and Deployment Plan -Preliminary Planning
Preparation is the be-all of good emergency management. As such, TFR offers annual on-
site training and tabletop exercises for all clients wishing to participate. Usually lasting 4 to
5 hours, TFR conducts the training service in the months preceding Hurricane Season on
simulated events developed by TFR. We offer this value-added service to clients to
familiarize ourselves with key emergency management officials and local agencies
designated to the project. TFR believes understanding the needs of the local officials allows
us to tailor-make a debris management plan that best suits the community.
In the past, TFR's key personnel have worked closely with many different
"Monitoring/Consulting" firms which have been retained by the clients, and whose
responsibility it is to provide expertise and guidance in the application of FEMA regulations
and reimbursement, to provide the aforementioned services.
Working together the client, and or its' designated representative, and TFR will develop a
complete, full service debris management plan that anticipates encumbrances, highlights
transparency, emphasizes expediency, and forces accuracy. The preparation and experience
® gained during our training exercises will position local officials to respond quicker and
realize full FEMA reimbursement. Additionally, by identifying key elements, such as debris
29
QI.FIIH. EInc.
DISASTER RESPONSE DIVISION
management sites and staging locations, TFR can better rapidly mobilize to ensure an
efficient response immediately following the storm.
Debris Management Site Location and Testing
One of the most important factors in rapid mobilization and debris removal is the
identification, certification and preparation of the temporary debris management site. We
cannot begin to remove debris from the rights of way until we have a place to take it.
Therefore, it is critical that site identifications, approvals and preparation be addressed
immediately after the disaster event.
TFR is dedicated in assisting our clients in the selection and qualification of debris
management sites. Identification and selection of appropriate debris sites are vital to the
recovery process. TFR has assisted in locating suitable sites for temporary storage and
reduction of debris for many of our clients. This is performed with careful attention to
Federal and State regulations and requirements.
In past planning sessions, advanced identification of possible temporary sites has been a
priority topic. If potential sites can be identified prior to an event, some of the requirements
to authorize the location for this use can be accomplished in advance of a disaster strike.
Some of these procedures can include researching the historical information to ensure
compliance with the National Historic Preservation Act and soil and water samples being
collected to file with State Environmental Protection Agency. Identifying sites early will
410 also aid the contractor in preparing a "site plan" to locate the most advantageous layouts and
locations for ingress and degress, taking into consideration probable traffic patterns.
Whenever possible, multiple sites should be identified in various locations of the
municipality/jurisdiction in order to shorten the removal time of taking debris from rights of
way and dumping at the temporary sites.
Priorities of the Client
When requested, TFR will assist in the establishment of emergency routes with a pivotal
focus on immediate need facilities. TFR will work closely with the client to assist in the
clearing of priority routes for certain immediate need facilities, including the client's EOC,
government buildings, hospitals and FEMA Distribution Centers, to employ a rapid 70-hour
"Push" to secure the facility access. Following the establishment of emergency routes, TFR
and client representatives will review maps and designated debris sites for debris collection.
Our goal is to develop a master plan outline that addresses the priorities and requirements of
the client and ensures the efficient allocation of resources to debris-ridden areas while
emphasizing safety to our crews and the community.
Additional Goals of the Preliminary Planning Meetings
• Identify potential disaster threats by examining past disaster/debris issues in similar
jurisdictions
• Introduction of Project Management Team
oRoles and responsibilities of key members of TFR
® o Roles and responsibilities of key member of the client's debris team
• Review of overall Debris Management Plan of the client
30
Qi.F.H. Eer rises, Iac.
p
DISASTER RESPONSE DIVISION
o Analyze pre-strike procedures, staging locations, mobilization plan and
response times
o Review 70-hour"Push" efforts and immediate need facilities to the
community
o Examine hauling plan and sectoring information for efficient response
o Debris Management Site Management Plan, including ideal locations, site
plan and potential environmental issues
• Participation goals for local, Disadvantaged Business Enterprises and vendor firms
• Review of various public information strategies
• Examine past projects and lessons learned
Emergency Response and Deployment Plan -Imminent Event
Beginning approximately three to five days from the event, TFR begins preparing its
equipment and personnel deployment. Depending on the potential severity of the event,
personnel and equipment support items are procured during this time (food, water, fuel,
etc.). These items are critical to TFR's ability to be completely self-sufficient. Our Project
Administrator will begin contacting subcontractors to ascertain the following information:
• Availability to commit to TFR and the project
• Insurance Policies
• Current equipment and personnel ready to mobilize
• Mobilization schedule
• Plans to maintain complete self-sustainability
11111
Priority will be given to local subcontractors who meet TFR's standards, followed by
subcontractors with which TFR has significant experience and trusts the standards of quality
by which the subcontractor performs its operations.
During this same -time period, the Fleet Manger in the home office will begin calling
National and Local Equipment Rental Dealers to identify available equipment on hand, such
as Rubber Tired Front-End Loaders, Skid Steer Loaders, Grapple attachments,
Knuckleboom Loaders, Bucket Trucks, Vacuum Trucks, Water Trucks, Bulldozers, Portable
Generators and Portable Toilets, to augment, if necessary, TFR owned equipment.
Additionally, the Fleet Manager will begin procuring the necessary permits to transport the
large equipment.
Two to three days prior to landfall, members of the TFR management team, such as the
Project Administrator, Operations Manager, and Project Manager will mobilize to the client
to begin making final plan reviews, finalizing staging areas, make lodging arrangements,
and begin preparing debris management site specific operational, safety, and environmental
plans. Logistical arrangements for the positioning of the Emergency Push crews prior to
landfall are finalized during this period.
One day prior to landfall, Emergency Push Crews are mobilized to their predetermined
positions. These crews are strategically placed so that they may arrive on the back side of
® the hurricane, as soon as safely possible, so as to begin opening critical roadways for the
31
QJIIF.H. Eethrp rises, Inc.
DISASTER RESPONSE DIVISION
local emergency responders. The exact number of crews will be based upon the likely
severity of the event but will meet or exceed the client's standards.
The TFR Operations Manager will be working with the client and will be with them
throughout the event, riding out the event in the Emergency Operations Center if needed.
Emergency Response and Deployment Plan -First 72 Hours
During the first 24 hours following landfall, TFR's multi-
faceted Emergency Response and Deployment Plan is fully
activated. The Emergency Push Crews are opening critical ,_ x
roadways, as prioritized by the client. Equipment utilized
during the "push" consists of rubber tired front-end loaders,
bobcats, backhoes, and other equipment types. Safety is of 4 ` % ''-� ri
utmost importance during this activity and coordination with
the local power provider is critical, as downed power lines are
a serious safety issue for these crews. The goals of the Emergency Push are:
• Clear roadways according to the given priority schedule
• Clear parking lots at critical facilities (police stations, hospitals, etc.)
• Remove large piles or material that interfere with critical lines of sight
• Maintain accurate time schedules and coordinate all activities with the client's force
account labor so as to maximize the "70 operational hours" that may be reimbursed
by FEMA prior to moving to unit rate billing.
While these crews are working, many other tasks are simultaneously occurring. One of the
most critical objectives during the first 24 hours is the completion of the initial damage
assessment. The primary goals of this assessment are:
• Determination of the affected area
• Extent of the damage
• Estimated amounts and types of debris
• Optimal DMS locations
Much work must be done during the first 24 hours to prepare the Debris Management Sites
for debris management and reduction. This work consists of:
Obtaining and Possessing Necessary Licenses and Permits
• The Operations Manager or his designee will investigate the state and local statutory
requirements needed to perform the work described in the pre-position planning in
the affected areas and determine what permits are necessary to complete the work.
Video and/or digital photographs of the site, before occupation, will be made for the
record, in addition to any soil, water or other test documents. After acquiring all
necessary permits and licenses, the Operations Manager and the Environmental
Manager will then prepare copies of all necessary permits for delivery to our client's
representatives.
32
iipri.F.R. EHrprisos, bc.
DISASTER RESPONSE DIVISION
Submittal of Site Plan and Establish Field Offices and Equipment Staging Area
• After the approval/assignment by clients' representatives of the DMS, the OM, the
site manager and representatives of the client will make a physical review of the site.
Within 12 hours of the location and inspection of the site, a final site plan will be
submitted for approval. The Site Plan shall reflect:(1) access to the site (ingress,
egress) (2) site preparation-clearing, erosion control and grading, (3) traffic control
procedures, (4) safety, (5) segregation of debris, (6) location of ash disposal area,
hazardous material containment area, contractor work area, and inspection tower, (7)
location of vegetative debris dump, (8) location of Mixed Debris and C&D dump,
(9) location of temporary sanitary facilities, (10) location of reduction operations
including incineration operations, chipping operations, (11) location of any existing
structures or sensitive areas requiring protection from smoke, dust, noise and with
awareness to existing traffic conditions (12) location of dump area for debris hauled
from the public or haulers other than TFR with traffic patterns reflected for this area.
Tasks will then be assigned to construct and establish required elements of the site,
such as the inspection tower, hazardous materials containment area, temporary
fencing, etc.
For the purpose of this RFP and for the general understanding of the layout offered by TFR,
included is a general site plan utilized by TFR on previous projects and that directly
addresses the uses outlined above. However, before these site plans can be formally
submitted, the necessary soil and water samples will need to be taken, checked and filed
® with appropriate Government Agencies and maintained, on hand, at the TFR field office.
The site plan will be reviewed and accepted by client representatives before the DMS begins
accepting storm-generated debris.
• flagman
Ccstn
Metals,other
direct recyclables CStD
Debris
Offices,Parking&Sanitary }lower Dump&Turnaround Area
•
• A
50'-ISO'
Flagman
•
e-Waste
HTW = Vegetative Debris
Mulch
•
Tires White ••
goods
Stop Blocks .
Ash Pit& �r '\.1 ._.11)Grin
Air Curtain Incinerators /
300 It
® V
Ioo.A
Exclusion
Y zone
33
QI.FIH. Ear rises, Ic.
p
DISASTER RESPONSE DIVISION
® Inspection Tower Construction
PDiagrams
Corrugated metal
roof,7'minimum
above floor with 2'
overhangs
f 04
Min.3' Work table,Min.
additional -----___6, 4'x2.5' ''/'
height plywood w/4 Floor area 8'x 8',2x8 joists,
corner support 16 O.C.w/'/."plywood floor
supported by 4-6'x6'posts
4'high,%..
--1--Iranchored 2'into ground with
Jconcrete
plywood
walls
-
Symmetrical
wooden stairs w/top
Treated 6 x 6, 10' rail 30-34"and
ground-to-floor, mirinil
anchored 2'into
•
ground with
concrete
0 N.
I i
I I I
I II
..
Min.3'
4'
I
I ` 10
AF AlTv
Iiia,
` I?
si I
AT1
41
.._
- _ - 1 , i
I I I I I I I I I Min.2'
II II II II +
34
QIIF.H. Ehoc.
DISASTER RESPONSE DIVISION
Additional items that MUST be procured during this time, if they have not previously been
procured, are:
• Lodging, preferably an RV park
• Distribution of Employee and Subcontractor Contact Lists
• Acquisition of all necessary Permits and Licenses
Twenty-Four to Forty-Eight Hours Post-Event
Within 48 hours of the event, all mandatory administrative deliverables (bonds, safety plans,
etc.) will be submitted to the client. Operationally, TFR is committed to the following:
• 50% mobilization and certification of load and haul crews
• At least one DMS will be operational and receiving debris
• Emergency Push will be 66% complete
Forty-Eight to Seventy-Two Hours Post-Event
• 100% mobilization and certification of haul crews (if more than 150 units are
required, 96 hours may be required)
• Emergency Push is complete
Emergency Response and Deployment Plan—Load and Haul Phase
The first thirty days are of utmost importance in
maximizing our client's FEMA reimbursement,
particularly if they have elected to participate in the CO;; :� "`
lianw Tx TM rcxe
Public Assistance Program, as outlined in the PAPPG
January 2018 publication. This program states that a ,XT.,MI WISER
Public Assistance Applicant may receive reimbursement iaUANTInES: 1
of up to 85% of the costs incurred within the first 30 1;7.;;-;% I 1=1
days, 80% of the costs incurred between days 31 and 90, I IT= I
and 75% of the costs incurred between days 91 and 180. I a w
TFR is committed to an aggressive mobilization and
LOTIO
operational strategy that will maximize this `� N�==�
reimbursement. Unless it is a major event, TFR's goal
12
is to complete 75% of the load and haul within the i''E "'`STE
`-`
first thirty days and be complete with the load and ,8�I
haul by day 60. sem:
PACS CR'.EX
tlx
Removal of Debris from Public Right of Way �
Upon receipt of a task order and at the direction of our Ar,A::,y,,_, ,,,G„ne ,_.,xc
me
client's representatives, the Operations Manager will �"�'� ��`"��°"�'�
direct the Load and Haul Supervisor to dispatch the
previously selected loading and hauling equipment to
starting locations agreed upon by the client and TFR.
One foreman will oversee the loading and hauling operations for each crew. The foreman is
® responsible for conducting toolbox safety meetings, and a general briefing of operations
including truck routes, local ordinances and other pertinent information. The foreman is
35
QI.F.H. EInc.
DISASTER RESPONSE DIVISION
equipped with fire extinguisher, pick-up truck with
mobile radio and cellular telephone, first aid safety kit '9uira .
and list of emergency telephone numbers and map tomuc..EADmcE..,u
emergency medical facilities. The foreman is responsible �E
for preparing a daily report of activities. “• c.
IIESUM
Prior to Truck Certification and Inspection, all y,�
Subcontractors will have met with the Sector ForemanINv
--�
and provided the necessary paperwork including copies
of current current certificates of insurance (general, auto, workers
comp.) copies of driver's licenses, and the execution of _
,,,E,
Subcontractor Agreements including: OR
• Copy of Scope of Work .,� 1 • �" ,�
•I II ° I
• Copy of Accident Prevention Plan
• Copy of Safety Sheet ;*-
• Copy of Ticket Reporting Procedures 1 .
• Location of Emergency Response Facilities and I�
Contact Numbers
• Copy of Equal Opportunity Policy
• Copy of Alcohol and Drug Abuse Policy
A truck Measure/Certification Site will be established at DMS, staging site, or another
appropriately designated location determined by the County and City, for all trucks to be
inspected measured, photographed, and, in case of tonnage contracts, a tare weight. Truck
Certification, available upon request, will include the recording (first on a paper
Certification Form and by Electronic Form) of the following:
• Date of Measure
• Assigned Truck Number SAMPLE TRUCK IDENTIFICATION PLACARD
• Truck Measured Capacity
• Truck Description (including model, type and color)
• License No. And State QUI MOSE,la.
DISAS•Ef VESVONSE DIVISION
• VIN No.
• Truck Owner
UADER
• Name of Subcontractor Truck is working for caNTRACTTO
• Truck Driver
• Truck Driver's License No. And State
• Truck Drivers cell phone or contact number
• Truck Tare Weight „ K,
• Notes or exceptions (i.e. descriptions, deductions
for dog house, etc.)
• Signature space for;
o Truck Driver "E"SNED
c�wcm CY
o Contractor's Representative
o Client's Representative
36
QIUFIHI Eer rises, Inc.
p
DISASTER RESPONSE DIVISION
• A photograph of the Measured Truck w/driver will either be, taken by Polaroid
Camera and attached to the Certification Sheet; or by Digital and Stored.
• Each Truck Dump Bed will be assigned the required TFR issued side signs on each
dump body, all to be weather durable, tamperproof and non-removable and will
include (in large and clear writing):
o Company Name
o Truck Number
o Maximum Volume in Cubic Yards
o Inspector's Name and Date
o These signs will be placed, one each on each side of the dump bed body and
be maintained throughout the duration of the project to ensure readability.
• Additional Truck dump trailers (pup trailers) will each have a separate truck measure
certification including all of the.information outlined above along with a notation as
to the truck that it is coupled with.
• The truck certification will include: •
o Inspector's Name and Date
Before equipment is dispatched to the loading sites, it will have already undergone all the
necessary safety inspection, measurement and hauling procedures at the staging area as
outlined in the section above. All loading and hauling crews will have received a copy of the
scope of work, accident prevention plan, safety indoctrination, and assigned a crew foreman.
All crews and foremen will be instructed by the Project Manager that they are to work in
® areas designated by a client Debris Manager and are not to relocate or move from one area
to another without prior approval of the Operations Manager. No employees, or
subcontractors of TFR will be allowed to work for private or other public entities while
employed or contracted under this project.
Hazardous Tree Removal
Unstable and leaning trees along a public ROW or within a naturalized area, such as public
parks or golf courses, may be eligible for removal. The Sub-Grantee may choose to attempt
to save the tree through straightening and bracing, if the cost of repair is less than the
removal and disposal. A tree is deemed hazardous and eligible for removal if:
• The tree is an immediate threat to public health and safety or improved property
• It has a DBH of 6" or greater when measured 4.5 feet above ground level
AND one or more of these criteria:
• 50% or more of the crown is damaged or destroyed
• A split trunk or broken branches that expose the heart wood
• Fallen, leaning or uprooted within a public use area
• Leaning at an angle greater then 30 degrees
After a tree has been deemed eligible and scheduled for removal, TFR tree crews will
discuss a tree specific removal plan to ensure a safe, proper felling operation, considering:
® • Surrounding area for anything that may cause trouble when the tree falls
• The shape of the tree, the lean of the tree and decayed or weak spots
37
QI.F.H. ERterprises, lc.
DISASTER RESPONSE DIVISION
• Wind force and direction
• Location of other people
• Electrical hazards
Once the tree crew has identified a tree specific removal plan, the following procedures shall
take place:
• The employee shall work form the uphill side whenever possible.
• Prior to felling operations, the work area shall be cleared to permit safe working
conditions and an escape route shall be planned.
• Each worker shall be instructed as to exactly what he/she is to do. All workers not
directly involved in the operation shall be kept clear of the work area.
• Before starting to cut, the operator shall be sure of his/her footing and must clear
away brush, fallen trees, and other materials that might interfere with cutting
operations.
• A notch and back cut shall be used in felling trees over 5 inches in diameter
measured at breast height (DBH).
• The depth or penetration of the notch shall be about one-third the diameter of the
tree. The opening or height of the notch shall be about 2.5 inches for each 1 ft. of the
tree's diameter. The back cut shall be made higher (approximately 2 inches) than the
base of the notch to prevent kickback.
• The resulting notch shall be flush cut to the ground.
Hazardous Limb Removal
Hazardous limb removal work shall consist of the removal and disposal of storm-damaged
limbs that are:
• Imminent and impending peril to the public
• Greater than 2" in diameter at the point of breakage
• Broken and still attached to the tree
The resulting debris will be collected from the grounds and hauled in accordance with
normal debris collection standards.
Hazardous Stump Removal
The removal of hazardous stumps is a unique process requiring specialized equipment. As
such, this process requires unique documentation and costing to realize full reimbursement,
and meet the following criteria:
• 50% or more of the root-ball exposed
• Greater than 24" in diameter, as measured 24" above the ground
• Located on public property or a public ROW
• The removal of the stump requires extraction
Once the diameter is established, pictures are taken, GPS coordinates establishing the
location and the specific threat documented, the stump will be physically removed by the
® best means available. The resulting hole from the stump removal will be backfilled and
amount of material needed will be recorded.
38
QJ.F.H. Eorprisos, IOc.
DISASTER RESPONSE DIVISION
Reduction of Debris
Reduction of debris is normally applied to the vegetative debris such as brush and trees
debris, which is also referred to as "burnable debris". However, the reduction process can
also be applied to some items that are considered non-burnable or construction and
demolition debris. This would include such items as household furniture, construction
materials such as roofing, treated timber. This process is applied for the purpose of reducing
the volume of the material that is being landfilled. The economic evaluation of weighing the
reduction cost against the unreduced landfill cost will be a factor in determining the
feasibility of this approach. The most common methods of reduction are burning, chipping
and grinding, compacting and recycling. Recycling is covered in the various sections as
appropriate.
Incineration
There are two general classifications of the burning method, open burn and air curtain
incineration.
Open Burning: Open burning, although very cost effective, may not be suitable for urban
areas. The feasibility of this method is very dependent on location and the cleanliness of the
debris. Many areas and locations will not permit open burn particularly in urban
environments where heavy smoke can create health and property damage concerns.
However, in rural locations, if the debris is clean, there is very little environmental impact
and the resulting ash can remain on the site or be used as a soil additive. Bulldozers and
loaders are the primary equipment required to operate an open burn process.
Air Curtain Incineration: Air
curtain incineration is also a very
cost-effective method of reducing
clean, vegetative debris but with NOZZLE~ o
ri
less environmental impact than the AIR CURTAIN PLENUM Fay
open burning method. Air curtain4i ��
L� •^�DR WALL EITHER DIRT OR
incineration, incorporates the use R PRE.MANUFACTURED
of a "burn pit" aided by a forced R
air blower. The pit can be 44
constructed below or above grade •
(depending on water table) and IMPERVIOUVE
includes a mechanical blower to LAYER
create constant optimal burn rates
and an "air curtain" effect. The air
curtain incineration system is a combination of the blower and pit, engineered as a unit to
achieve the effect of holding the smoke while feeding air to the fire pit. Since differing site
locations contain differing conditions, such as soil composition, water table levels, etc. there
are no air curtain incineration systems standards in the industry. In the construction and
operation of an efficient air curtain incineration system, special consideration must be given
to the following factors:
® • A set back of at least 100 feet between debris piles and the burn area with a
minimum setback from buildings and structure of at least 1,000 feet.
39
Q.E.R. Eorprises, Inc.
DISASTER RESPONSE DIVISION
• Construction of non-combustible "warning" stop blocks (at least 1 foot in height) for
equipment located at the burn pit
• Use limestone (or equal material) for the construction of the "pit" with reinforced
earth anchors, or wire mesh to support the loader ramps.
• Use clay or limestone to create an impervious layer on the bottom of the pit to
prevent leaching of the ash from the aquifer. This layer shall be at least 1-foot deep
and will be regularly inspected and maintained at that depth in the event scraper
activity removes part of the layer during operations.
• Seal the pit ends at least four feet high.
• Pit construction (in accordance with this solicitation) shall be 8-9 feet wide, and 14
feet deep.
• A 12" dirt seal will be placed on the lip of the burn pit area to seal the lower nozzle.
• The blower will be configured to direct the airflow to strike the wall of the pit 2 feet
below the edge. Operators will be instructed that the debris should not break the
path of the airflow except during dumping.
• Equipment used will be tested and adjusted to assure that a minimum nozzle velocity
of 8,800 ft/min (100 mph) and a volume of 900 cf/min/linear feet is produced during
burn operations.
• The length of the pit shall be no longer than the length of the blower nozzle.
• The operators shall be instructed to load the pit uniformly along its length.
• Operators will also be instructed to extinguish the fire at least 2 hours before
410removing the ash.
• Water trucks will be used to dampen ash residue as well as areas surrounding the
burn site.
Chipping/Grinding
Reduction of debris by chipping and/or grinding
is an opportunity to recycle the vegetative debris els
back to an economically beneficial use. However, it (mss`
the overall economic impact of chipping/grinding 0�5 ��`�—_ ._ }n�
compared to burning will have to be reviewed f `�_ `
before a determination can be made.
Grinding/Chipping is the reduction of woody,
vegetative debris by cutting and pounding the debris to reduce the woody materials into
small pieces or "chips" This method normally produces a reduction of between 3 to 1 and 5
to 1, whereas burning reduces the debris by approximately 95%. However, wood chips have
the possibility to be recycled and used as mulch, fuel, ground cover and animal bedding to
name a few. The availability to recycle the chips would be a significant factor in
determining the economic value of chipping/grinding. In the construction and operation of a
chipping/grinding reduction operation, special consideration is given to the following
factors:
• Grinding machines must have a clearance of 300 feet. Warning signs must be
stationed around the perimeter of the grinding equipment, warning of possible flying
objects from the grinders.
40
QIUF.H. EInc.
DISASTER RESPONSE DIVISION
• The grinding machines must have screens,
which produce chips not exceeding 4 inches
in length and % inch in diameter.
• Liners shall be placed underneath grinders,
and other stationary equipment, as a _ . ,' �►
preventative measure against possible leaks ?'
or spills exposing the soil and groundwater
to contaminants.
• Debris must be sorted and clean of other " 'L_ ,
contaminants such as metals. . • ,
•
• Operators must wear hard hats even in
closed cab machines while operating.
• Root Rake loaders are used to avoid contaminating the debris entering the grinder
with dirt or sand.
• With a grinding capacity of approximately 800 CYD in an hour, debris hauled into
the DMS site can be reduced and recycled while other debris is coming in making
room for more debris and not requiring as much land mass for the site.
• Ground debris or mulch shall be stored onside in piles no higher than 15 feet. Such
piles shall not remain on site for longer than seven (7) days and haul out procedures
shall be put in place to ensure the continued turnover of the material. Ground debris
or mulch, is monitored daily for heat and internal combustion.
Segregation of Debris
Before material is brought into the DMS, all preparations for the site as outlined previously
will be substantially completed. The DMS will have staging areas for each category of
debris brought into the site. All debris will pass by the inspection tower after entering the
site and all loads will be inspected.
Although every effort will be made to segregate debris on the right-of-way before loading,
debris materials still become mixed and some loads are so co-mingled that they are
classified as mixed debris loads. These loads will be directed to the area defined on the site
plan as the "mixed debris" pile. This material will be sorted and separated by machines with
grapples and "thumbs" and by hand labor and placed into the C&D, Vegetative, HHW,
White Goods, and Metal Piles.
C&D Debris is non-burnable, non-recyclable debris that will eventually be delivered to a
landfill. Samples of this type of debris include mattresses, clothing, household garbage,
concrete, asphalt, metals, plastics, manufactured furniture, building components, etc. Parts
of this material, if well separated, can be reduced by grinding before landfill, so as to reduce
the cost of hauling and tipping fees (if charged by volume). Other parts, such as metal can
be recycled if well separated and cleaned.
Vegetative Debris is burnable debris and can be reduced by either incineration or by
chipping/grinding. If reduced by incineration, the estimated reduction rate is 95% and leaves
11 the ash residue to be hauled off and disposed. If reduced by chipping/grinding, the reduction
rate is estimated at only 60%-75%, however, the by-product, mulch, can be recycled. The
41
J.E.R. Eurprises, Inc.
DISASTER RESPONSE DIVISION
411 vegetative debris may become mixed with earth materials such as dirt, gravel, rock, or sand
during the disaster. Root rakes are employed to shake and separate the brush and vegetative
debris before it is reduced. Sometimes shaker screens or trommels are necessary to separate
the earthen debris before reducing.
Household Hazardous Waste (HHW) is debris such as household chemicals, pesticides,
unidentified liquids, paint, batteries, etc. As mentioned earlier, the primary goal is to
separate this material on the curbside and pick it up separately by a designated HHW crew.
These items are then delivered to the collection points designated by a Client Debris
Manager. However, if HHW inadvertently becomes co-mingled with other debris and enters
the site, it is separated from the other debris and placed into a Hazardous Containment area
on the site for further disposal by those licensed to handle and dispose of this type of debris.
White Goods refers to items such as refrigerators, air conditioners, freezers, etc. which may
contain chemicals or fluids such as Freon or oil, which must be remediated by someone with
the appropriate license and certifications to do so. These items should be separated at
curbside and delivered to the collection points designated by a Client Debris Manager. If
they are brought to the site for temporary storage, they will be contained in a separate
staging area so that they may be inspected and properly cleaned of all chemicals or fluids.
Metals will be separated at the curbside and delivered to a separate staging area at the DMS
unless directed otherwise by a client Debris Manager. These items may be recycled.
® During the operation of a DMS Site, special attention is afforded to the following areas:
• Site Safety: The Operations Manager and the Site Project Manager will conduct a
Pre-Operations Site Safety meeting prior to the beginning of operations of the debris
reduction site. Items to be included in the Safety meeting will be:
• An overall review of the Site Plan and directions as to the location of all temporary
structures, the planned traffic flow, location of first aid stations, eye wash stations,
fire extinguishers and location of sign with postings of emergency numbers.
• The first Weekly Safety Meeting will be held and all information as outlined in the
Company Safety and Occupational Health Plan will be covered.
• The Activity Hazard Analysis for each operations activity will be reviewed and
discussed.
• A communication path between the site management and site personnel will be
established in the event of an emergency so that an orderly and efficient means is
established to mitigate the event.
• Dust Control: TFR provides water trucks, which do routine trips throughout the site
during the operations, keeping dry roads dampened for minimizing the dust count.
Water trucks are also used to dampen ash residue when removed from burn pit to ash
pit. Attention is given to normal wind direction when layout of the site is prepared.
• Hazardous Materials Containment Area: The Site Manager will regularly inspect the
Hazardous Materials Containment area for any cuts, tears or leaks in the protective
membrane that lines the containment area. The Manager will also inspect the berm
surrounding the area to assure proper site runoff is still intact.
42
JIF.HI Fnlr rises Inc.
DISASTER RESPONSE DIVISION
• Roadways: Traffic will be designed as to allow the flow of incoming and outgoing
debris trucks to avoid congestion. Safety, and directional signs will be posted
throughout the site along with flagmen to assist and control traffic flow as well as for
safety reasons. Road surfaces will be rock-laid for easier maintenance and to protect
from erosion. Private, non-operation-related traffic will be prohibited from the site.
• Communication: Operators and flagmen are equipped with two-way radios on the
same frequency as the office base radio unit so that communications will be readily
accessible throughout the site.
Disposal
Disposal sites for the debris will be determined before operations begin. This submittal
encompasses the possibility that a permanent or final debris resting-place may not be
immediately available in the beginning of operations, and we have therefore included the
general operations of a Temporary Debris Storage and Reduction (DMS) site in this
proposal.
Disposal of debris is the operation of placing debris in its final resting place such as a
licensed, permitted permanent landfill or as expressed above, at a DMS site. This operation
includes the use of hauling equipment. In the Hauling and Dumping operations, special
consideration is given to the following:
• All loading and hauling crews are under the direction of a TFR supervisor. Daily
® reports are maintained by the Crew Foreman, and all equipment down time for
repairs are noted on the daily reports. Hours of each piece of equipment and each
employee are recorded and reconciled with a Client Representative, daily.
• Qualification of all operators/drivers is reviewed and determined before being
allowed to haul materials.
• All insurance documents and copies of driver's licenses are on file in the field office
before beginning operations.
• The safety orientation meeting is held by the Load and Haul Project Manager before
operations begin.
• Equipment is inspected, and a record of the inspection is retained on file in the filed
office before operations begin.
• Operators/drivers are versed on the dumpsite procedures before leaving the loading
site.
• All truck operators will be instructed to observe traffic regulations and follow the
instructions of the flag persons.
• All operators will report to the weigh station/inspection tower and deliver their "load
ticket" to the QC operator (or government inspector) for inspection and approval
before proceeding to dump his/her debris.
• The designated dumpsite operator will direct each truck operator as to where to
dump each load at the dumpsite location.
• Each truck operator will inspect his truck and tailgate after the dumping process is
411 completed to assure that it is secure before leaving the dump area.
43
QI.F.H. EInc.
DISASTER RESPONSE DIVISION
• Truck operators will follow the designed traffic flow when leaving the dump and
return to the designated loading area.
Haul Out Procedures
Hauling Out of debris is the operation of hauling reduced debris from a DMS to a final
resting place at a designated destination to be used in any number of capacities such as
ground cover, bio-fuel and fertilizer. This operation includes the use of hauling equipment.
In the Hauling Out operations, special consideration is given to the following:
• All hauling crews are under the direction of a TFR supervisor. Daily reports are
maintained by the DMS foreman, and all equipment down time for repairs are noted
on the daily reports. Hours of each piece of equipment and each employee are
recorded and reconciled with a Client Representative, daily.
• Qualification of all operators/drivers is reviewed and determined before being
allowed to haul materials.
• All insurance documents and copies of driver's licenses are on file in the field office
before beginning operations.
• The Load and Haul Project Manager hold the safety orientation meeting before
operations begin.
• Equipment is inspected, and a record of the inspection is retained on file in the field
office before operations begin.
• Operators/drivers are versed on the dumpsite procedures before beginning loading
activities and hauling reduced debris out of the DMS site.
• Trucks are loaded by rubber-tired backhoes, or excavator, utilizing a mulch ramp
constructed approximately twelve (12) feet high, eight (8) feet wide and at a grade,
not to exceed, thirty-five (35) degrees. This shall be determined at the site depending
on topography and availability. No individuals will be allowed on the structure
unless otherwise instructed to do so by the DMS Manager and/or assessing the
overall safety of the structure.
• Each truck operator shall inspect his/her truck before proceeding to the inspection
tower to ensure the load is filled and all items are secured and covered by a tarp or
other covering preventing chips from being blown from the bed.
• All truck operators will be instructed to observe traffic regulations and follow the
instructions of the flag persons.
• All operators will report to the weigh station/inspection tower and deliver their "load
ticket" to the QC operator (or government inspector) for inspection and approval
before proceeding to leave the dump to its destination.
• Truck operators will follow the designed traffic flow when leaving the dump and
return to the designated loading area.
White Goods, E-Waste, and Putrefied Foods
White Goods refers to items such as refrigerators, air conditioners, freezers, etc. which may
contain chemicals or fluids such as Freon or oil, which must be remediated by someone with
the appropriate license and certifications to do so. These items will be separated at curbside
and will be delivered to the DMS collection point. At the DMS we will contain Dirty White
Goods separate from White Goods and they will be inspected and properly cleaned of all
44
T.F.R. Eofflrprisos, Inc.
®
DISASTER RESPONSE DIVISION
chemicals or fluids or removed by professionals certified and licensed to dispose of them.
TFR shall submit a Dirty White Goods Operations, Cleaning and Disposal Plan prior to
beginning site operations.
Upon award of a contract, a Hazmat removal team will be assigned to oversee the curbside
removal and HHW removal at the DMS site and, if given a contract for ROE, precede the
demolition team. The Hazmat team will remove all HHW and White Goods to the curbside,
separated, before haul off, or demolition begins. This team will document on a daily
reporting form, the type and quantity of HHW and White goods at the pick-up location.
• Refrigerants with putrescible wastes will be sealed by taping closed so as not to have
accidental openings and spillage while in transit to disposal site.
• The separated HHW and White Goods will be transported by separate container
from the demolition site to the DMS.
• Any HHW that may inadvertently become mixed with truckloads shall be separated
at the DMS site and stored in the HHW area for removal by the HHW crew.
• Automobiles will be removed to a separate temporary storage area where they will
be held for recycling.
• Loose tires located at curbside will be kept separate and removed by the HHW crew.
• Extra caution will be applied to the handling of dirty white goods that still contain
putrescible wastes, such as sealed freezers, refrigerators, coolers and iceboxes.
Putrescible waste is solid waste that contains organic matter capable of being
• decomposed by microorganisms and of such a character and proportion as to cause
obnoxious odors and to can attract or providing food for birds or animals. Improper
handling of putrescible waste could lead to odor issues that make siting and
operating a DMS difficult. There are also numerous potential employee health and
safety issues related to the removal and disposal of putrescible wastes. These White
Goods shall be delivered to a landfill certified to handle Municipal Solid Waste.
• White goods may also have refrigerants (Freon and Freon replacements), and often
plastics and motors and sometimes other electronic components that need to be
removed before recycling. Refrigerant removal must be done by trained and
qualified personnel and can potentially lead to spills of regulated chemicals. Only
certified, experienced and trained personnel will be used for these critical tasks to
minimize risk and maximize efficiency.
• All waste removal, cleaning and handling will be managed to minimize potential
exposure of workers and others to waste and minimize generation of odors.
• Procedures such as proper sealing of refrigerants and containers will be in place to
control vector exposure, attraction of wildlife and minimize volume expansion
through addition of water to the waste stream.
Vehicles and Vessels
Abandoned Vehicles and Vessels will be removed and taken to a temporary staging/storage
area. It is anticipated that the State Government's Department of Transportation or
Department of Motor Vehicles will be the project manager for title of ownership issues
related to any vehicle recovery and recycling project associated with the disaster response.
45
QI.F.H. Enrprises, Iac.
DISASTER RESPONSE DIVISION
41111 Vehicles and vessels brought to the staging areas will be inventoried by license plate, make,
model, color and vehicle identification number. They shall be staged and site tagged for
easy retrieval.
For a vehicle or a vessel to be deemed eligible it must:
• Present a hazard or immediate threat that blocks ingress/egress in a public-use area
• Ownership is undetermined
• The applicant followed all local ordinances and State laws by securing ownership
• The applicant verified chain of custody, transport, and disposal of the vehicle or
vessel
Disaster Debris Recycling
TFR is a green industry company. The principals of TFR are proponents of recycling
whenever possible and many members of management are LEED Certified. As such, TFR
utilizes tub grinders, slow speed shredder, trommels, loaders, and excavators which are used
to sort, separate, and reduce vegetative debris to reusable mulch, dirt, metals, and other
construction products. Following each disaster event, TFR will make every effort to locate a
reusable purpose for this material such as bedding material for plants, ground cover for
parks, animal bedding, and reusable energy sources as boiler fuel for co-generation plants or
production mills. In addition to the vegetative recycling, every effort is made to keep the
metals segregated and clean so that the Ferris and non-Ferris metals can be recycled. In
cases of large quantities of mixed debris, a system of separation using a trommel, air curtain
burner, picking line conveyor and tub grinder, can be used which will allow the paper and
plastic to be separated, and the clean dirt, rock & concrete, Ferris metals, non-Ferris metals
and clean vegetative debris sorted and piled for recycling.
Sources will be sought for the following recyclable material:
• Asphalt
• C&D
• Concrete/Aggregate
• Dirt
• E-Waste
• Metals
• Roofing Materials 4I
• White Goods
• Mulch
• Tires
TFR has vast experience employing recycling activities and maintains established
relationships with recycling firms to accept various types of debris. While completing debris
reduction of 2,000,000 CYD for the City of Tulsa, TFR loaded the chips on railcars and
shipped the excess reduced debris to a Company-owned mulching facility in Leander,
Texas. Alternative methods of disposal exist and are well documented by TFR. During
Hurricane Ike, storm-generated debris from Polk County was hauled and burned at a local
46
QIUFIR. EInc.
DISASTER RESPONSE DIVISION
paper mill in Orange County, Texas. This strict commitment to recycling of storm-generated
debris has benefited both client and TFR.
Emergency Response and Deployment Plan— Project Closeout
At the cessation of DMS operations, all sites will be restored to the satisfaction of our
client's representatives/owner with the intent of maintaining the utility of each site, leaving
it unencumbered for future use and to safeguard the environment. Soil and water samples
will be taken and compared to pre-work samples to ensure that TFR operations have not
negatively affected the environment. Other factors that are considered during the
remediation process are:
• All pre-existing grades including roads, ditches, etc. will be restored to the
satisfaction of the customer prior to final closure of each site.
• Areas where soils were excavated (e.g., ditches and retention ponds) or stockpiled
(e.g., berms) will also be restored to pre-existing grade prior to vacating each site.
• Pre-construction drainage patterns will also be restored, as well as all improvements
(e.g., trailers, wells, fencing, construction entrances and built up aggregate haul
roads) will be removed from each DMS unless otherwise instructed by our client's
representative.
Upon completion of the above remediation tasks, TFR will photo-document site conditions
using both video camera and still photographs. As done with the water and soil samples, the
post-work photos will be compared to pre-work photos to ensure that the site was
remediated to original condition.
Subcontracting Plan
TFR is uniquely positioned within the debris removal industry as one of the premier
companies maintaining an extensive fleet of machinery utilized in debris removal, reduction
and management efforts to fully operate independently. To accommodate your debris
project needs, TFR provides access to 140 pieces of equipment including, but not limited to,
sixteen (16) self-loaders with trailers, eight (8) Diamond Z Tub Grinders, as well as heavy
haulers, excavators and five (5) mobile command units maintaining electronic access to
manage entire projects. This extensive list would be insufficient without the pairing of our
in-house maintenance crew. These individuals ensure that key equipment necessary for
fluid; efficient operations shall never hamper the ongoing project and impact TFR's project
timeline to the client. TFR's maintenance crew augments the daily responsibilities of our
employees and subcontractors by fulfilling all duties to the client to secure the vitality of our
equipment and the project.
With the large fleet of equipment and the necessary logistical support, TFR is fully capable
of quickly and efficiently responding independently with a substantial workforce of
equipment and personnel to an effected community almost immediately. However, this
independence does not secure the necessary goals strictly outlined and routinely reinforced
by upper management in response to our service-minded attitudes. TFR firmly believes that
® our business cannot be sustained and grow without the strong, positive working relationship
with our clients, suppliers and our countless subcontractors. This service-minded attitude
47
QI.F.H. Far rises, lc.
Q
DISASTER RESPONSE DIVISION
drives the business and fortifies the strong relationships TFR maintains with our
subcontractors. Therefore, such relationships maintained with small business, minority-
owned, and numerous other companies allow TFR to fulfill the requirements that may be
mandated by the client's Representatives and other Government Agencies. In the past, TFR
has employed as many as 250 subcontractors during a single event and maintains a data base
of 300+ experienced, previously employed and approved debris removal subcontractors
throughout the United States.
Local Subcontracting Procedures
At TFR, we firmly believe that local contractors provide the most cost-effective measure to
complete the contract requirements while aiding the local economy after the impact of a
disaster. TFR plans to utilize local subcontractors to the extent at which they are available
and properly licensed. TFR shall exhaust all avenues to obtain qualified local subcontractors
to meet the needs of the community while infusing the local economy with needed revenue.
As such, TFR is committed to identifying the local subcontractors qualified and prepared to
support the community on the path to recovery. TFR plans to solicit and establish local
subcontractors through the following plan:
TFR Enterprises' principals and managers have always exercised a policy of recruiting
subcontractors in the affected work area. This practice is considered good business because
of the advantages received by contracting with local companies residing in the affected area.
There are a number of factors that contribute to the overall effectiveness of local
® subcontractors: (1) familiarity with the areas to be worked, (2) knowledge of the most
efficient traffic patterns, (3) information on local suppliers for parts, equipment repairs, etc.,
(4) reduction in end project costs as local subcontractors do not require housing and travel
cost, per diem, etc. These factors reduce the cost of the project to the client while allowing
the county to retain large portions of the money in the hands of its constituency. With these
reasons in mind, TFR is committed to fulfilling the requirements of the client by
implementing the Local Subcontracting Plan listed below:
1. Establish a local telephone line so that it may be contacted easier than calling to
long-distance cell phone numbers.
2. The Company will post signs and telephone numbers at the entrance to its work
site and at its field office.
3. Subcontracting opportunities are advertised by local newspaper.
4. During the search for subcontractors following an award, the company's Chief
Operating Officer will contact the Small Business Administration office in the
work area and access the Procurement Marketing and Access Network, National
Minority Purchasing Council Vendor Information Service and the Research and
Information Division of the Minority Business Development Agency in the
Department of Commerce.
5. The local Veteran's Administration is contacted upon the company's assignment
of a task order, and alerted as to the type of products and service the contract
requires, and the company's local telephone number and address is registered
® with them, not only for subcontracting, but for short-term employment
opportunities
48
QI.F.R. Ear rises loc.Q .
DISASTER RESPONSE DIVISION
® 6. State and local trade agencies will be contacted, such as the Association of
General Contractors (AGC) for example. They oftentimes maintain databases
sorted by business classification and status and can provide a resource of small
businesses in the area.
7. The Chamber of Commerce in the affected area will be contacted and asked to
provide a listing of any (a) trade associations, (b) business development
organizations and (c) HUBZone concerns.
Contacts arising from these inquiries are followed up with calls to local subcontractors
requesting detailed information leading to their qualification for work. With such action,
TFR shall exhaust all avenues to identify, qualify and employ any local subcontractor.
When local subcontractors are unavailable, outside sources may be contacted to achieve the
desired mobilization goals, in accordance with our pre-qualified list of subcontractors.
Disadvantaged Business Enterprise (DBE) Utilization
During the past two (2) decades, TFR has actively promoted the participation of small and
disadvantaged businesses in the performance of disaster-related debris removal projects.
Born from a small tree service company in 1954, TFR was a long time small business
enabled firm working in Memphis, Tennessee. Renamed TFR and incorporated in 1989,
owner, Tipton Rowland, considers this sector of the industry to be a vital and reliable source
of debris management resources recalling his days as a small business owner himself. As
such, TFR executives are directly involved in the achievement of small and disadvantaged
El)
business plans and goals by project.
Good Faith Effort
TFR is continually working to achieve higher goals for qualified small and disadvantaged
business subcontractors. For the purposes of this proposal, TFR will strive to meet or exceed
the expectations of the work under the contract to small and/or disadvantaged businesses.
Subcontractor Management
TFR manages subcontracts through a five-step process:
1. Selection of most appropriate subcontractors. This is done through balancing
geography and capability. Local subcontractors are almost always more cost
effective as they go home at night to sleep and eat. They also have local
resources for materials, supplies and equipment repairs, and thus, are preferred.
2. The issuing of the formal subcontract establishes contract compliance
requirements, formalizes expectations, and provides an established, impartial
mechanism for quick resolution of disputes as they arise.
3. Production is tracked, and expectations are communicated daily.
4. Daily active Quality Control results in immediate identification and correction of
problems.
5. QC and other reporting gets rolled up regularly into contract compliance and
reporting, such as small business subcontracting plans.
49
QI.F.O. EIc.
DISASTER RESPONSE DIVISION
TFR's Subcontractor Management Plan and approach is focused on three main performance
evaluation criteria:
■ Production, Safety, and Quality Control
Production:
Ready means that the subcontractors have completed appropriate administrative actions,
have their equipment and personnel on site and in condition to work, and they know the
tasks they are expected to perform. Prior to NTP, the subcontractors identified, selected and
are notified by the Operations Manager. Priorities are based upon a review the database of
all experienced subcontractors. The priority list for subcontracts is grouped into our known,
experienced subcontractors, and augmented by the capabilities of the local subcontractors.
Upon receiving notice to proceed from the contracting agency or at the discretion of the
Operations Manager, we will notify subcontractors on stand-by to execute mobilization plans
and their personnel and provide us with a firm arrival ready-to-work time. Additionally, TFR
personnel will also review the equipment and personnel requirements and compare with
equipment already on hand to determine the additional equipment and personnel to be
mobilized. This will first come from the Company-owned available list, then subcontractors
immediately available list, comprised of our known, experienced subcontractors and local
contractors, and equipment supplier's list.
® Working effectively means good communications of expectations and regular optimization.
There will be daily formal and informal communications between the Project Managers and
the subcontractor's superintendents. At the start of each day, the geographic area assigned
will be reviewed and verified, along with any known hindrances to free-flowing operations.
Also, covered will be production expectations, other difficulties expected, and the
performance of previous period (usually the previous day). In addition to this start up
communication, the subcontractors will have the chance to review and comment on the
previous QC report, noting key items like production reported, equipment and personnel
readiness and actions and variances. Each day (or other period depending on project
requirements) subcontractors will get the chance to communicate and "buy-in" to the
immediate operations plan.
Quality means the satisfactory completion of debris removal from given sectors in
accordance with the Scope of Work and approved by both the client Representative and
TFR's QC personnel. Continually checked and verified by our QC personnel and
documented in QC reports, subcontractors shall remove all debris, with exceptions for
C&D, HHW, etc., in each sector before moving to the next loading site. TFR closely
monitors subcontractors to ensure the quality of the end service to the client Under no
circumstances shall the subcontractor only collect large, "easy" debris; and more so, these
unacceptable deficiencies are noted in the subcontractors file with repeat offender's subject
to termination.
® Note: No employees or subcontractors of TFR will be allowed to work for private or other
public entities while employed or contracted under this project.
50
QI.F.H. EInc.
DISASTER RESPONSE DIVISION
Subcontractor Safety
Safety is considered a condition of employment and is the responsibility of all associated
with TFR, whether in the capacity of employee or subcontractor. All subcontract agreements
are subject to this Safety and Occupational Health Policy as a condition of the contract
agreement.
The following procedures will be administered to assure that all subcontractor activities are
fully integrated into the project safety plan and job hazards analysis. When subcontractors
first report to the job site and prior to beginning work, the project manager shall review with
the subcontractor safety representative the contractual obligation to safety and the project
safety rules that subcontractor employees are required to follow.
1. Review the Corporate Accident Prevention Plan and stress all the applicable
requirements and procedures.
2. Review the specific Company safety rules and regulations.
3. Review hazardous work conditions presented by the physical assessment of the
project.
4. Instruct their safety representative that they are to attend a monthly safety meeting.
5. It must be firmly established that all subcontractors' employees must be abide by the
applicable OSHA regulations.
® Subcontractor Quality Control Program
The purpose of this Quality Control Program is for TFR to establish a quality control system
to perform sufficient inspection and tests of all items of work, including that of our
subcontractors, to ensure conformance to applicable specifications and drawings with
respect to the production, quantities, field activities, materials, workmanship, construction,
finish, functional performance, and identification.
During work on this contract the quality control personnel will perform the required
inspections on the subcontractor's work. The Quality Control Officer is responsible for the
direct supervision of all superintendents and subcontractors to ensure that the work is being
performed according to the Scope of Work and TFR's Quality Control Program.
Additionally, the TFR Quality Control Officer shall prepare, sign and submit to the
Edinburg Representative a Daily Quality Control Report. This will include identification of
Subcontractor QC actions. Subcontractor actions subject to QC verification and reporting,
include, at a minimum:
• Summary of safety issues
• Infrastructure damage
• Total numbers of trucks loaded
• Equipment and plant hours worked and idled or down
• Testing performed and by whom
• Loads and quantities hauled to TDSRS
®
• Quantity of debris reduced (if applicable)
• Number of subcontractor personnel working
51
QI.F.11. Enterprises, loc.
DISASTER RESPONSE DIVISION
• Contract non-compliance issues
• All corrective actions
In the event of notice of a violation as a result of the actions of any employee or
subcontractor, the Operations Manager will take immediate corrective action and follow up
on the enforcement of such action and so notate in his daily log record. Additional quality
control measures will be discussed later in the Quality Control Section.
Multiple Delivery Orders in Multiple Locations
In general, the company management approach applied to multiple projects being performed
simultaneously is:
• Each Task Order has its own Task Order Superintendent assigned.
• Task Order Superintendents have the authority to commit the company
• All Task Order Superintendents report to the Operations Manager
• Depending on scope of work and size of contract:
- A Project manager will be assigned to each phase of the debris
removal/management operations, (i.e., Load & Haul Manager, TDSRS
Manager)
- Each Project manager will report daily to the Task Order Superintendent
- Each crew will be under the direction of a Crew Foreman who will report to
the Project manager
410
- Crew foremen will be responsible for maintaining daily reports and
overseeing the crew operations
• Each Project manager will:
- Provide daily work assignments to each crew foreman
- Perform daily reviews with the Task Order Superintendent of work
performed, time schedules, performance targets and work assignments for the
following day
Managing Multiple Subcontractors on Multiple Task Orders
If awarded multiple task orders in different geographical areas, TFR will assign a separate
Project Manager for each region to oversee TFR operations and subcontractors.
Subcontracting agreements will be often executed in the field and copies of all agreements
along with necessary, tax, insurance and license information will be available for review and
approval by client Representatives. As in all projects, it remains absolute condition
precedence; all subcontractors will be under the direction of a TFR Supervisor.
Each superintendent will establish a field office located within the area of the assigned Task
Order. The Superintendent for each task order will have the authority to hire subcontractors
and additional field personnel when necessary. All field office personnel will have electronic
linkage with the capability of communicating and sending information and daily records to
the home office. Daily ticket recording, and recordkeeping will be conducted and maintained
in the field. Should the quantity of work warrant enhanced capabilities for the region and at
the discretion of the Superintendent, TFR shall dispatch additional mobile command units
where necessary. Reconciled information for subcontractors and a client Representative will
be sent to the home office weekly and billings and subcontractor payments as well as local
52
QIUFUD. EIC.
DISASTER RESPONSE DIVISION
employees, vendors and suppliers will be recorded posted, and checks written on National
Banks from the home office. Checks for payments will be processed weekly and sent to the
field office by either courier or public carrier (such as Federal Express or UPS) for
disbursement.
Task Order Superintendents will appoint Load & Haul Crew Managers, Hazardous Tree
Trimming and Removal Managers, TDSR Site Managers and Demolition and ROE
Managers (as needed per task order).
Each Task Order Superintendent shall have the authority to commit the Corporation, and
resources of TFR including signing contracts and modifications. They shall also have the
authority to provide administrative and financial resources, equipment and personnel in
support of the project. Their authority will include supporting and investing authority and
oversight to Project Managers and Supervisors, Safety Officer, Quality Control Officer,
Environmental Officer, and Health and Safety Officer.
The Task Order Superintendent is responsible for day-to-day operations, including waste
stream documentation, daily reporting/progress and planning requirements, communications
with client Representatives, enforcement of Scope of Work, and oversight of Load and Haul
and TDSRS Managers. They report to the Operations Manager and the on-site client
Representative and act as liaison between the Company personnel and the on-site client
Representative.
Subcontracting agreements will be often executed in the field and copies of all agreements
along with necessary, tax, insurance and license information will be available for review and
approval by client Representatives. As in all projects as it remains absolute condition
precedence; all subcontractors will be under the direction of a TFR Supervisor.
TFR's Safety Overview
The safety and health of our employees continues to be the first consideration in the
operation of our business. TFR Enterprises, Inc., and
its' principals are committed to maintaining a safe and CORPS of£Nr,,
healthy work place for each employee by providing .`xt• IBA ��FFkS
•
guidelines for safe practices and accident prevention. CERTIFICATE
saa ern.lira
Safety is considered a condition of employment and is KEVINR"'SO"
�....6.1On. COMM(
the responsibility of all associated with TFR SS MR COUSTRUCTON SAFETY
Enterprises, Inc. whether in the capacity of employee or
subcontractor. As a condition of employment, each _ £ —
employee is expected to use safe work practices and
identify all unsafe conditions immediately. All -
employees are required to report any violations, unsafe
conditions or known safety hazards to their immediate
supervisors at once.
® All subcontract agreements are subject to the Company's Safety and Occupational Health
Policy as a condition of the contract agreement. To ensure compliance, the Safety Officer is
53
QIUF.H. Eloc..
DISASTER RESPONSE DIVISION
41/ empowered with the authority to take such actions necessary to protect life, health, and
safety and to protect the environment, as they deem necessary. This authority shall be
irrevocable and shall include, but is not limited to, the power to unilaterally alter, suspend
and/or halt any operation or portion thereof that endangers or potentially endangers life,
health and safety or threatens the protection of the environment. The Safety Officer will
report to the Operations Manager and to the Chief Executive Officer of the corporation.
A copy of the Company's Safety and Occupational Health Policy and its related Accident
Prevention Plan was not included with this proposal because of its length but will be
supplied upon contract execution. Policies covered in both plans are as followed:
• Management Safety Responsibilities
• Safety Coordinator & Supervisor Responsibilities
• Employee Safety Responsibilities
• Quarterly Accident/Injury Analysis
• Record Keeping
• Safety Education and Training
• Alcohol and Controlled Substances and Inhalants Policy
• Proper Lifting Policies
• Emergency Evacuation Procedures
• Accident Reporting Procedures
• Vehicle Safety Rules
• Safety Audits/Inspections
• Accident/Incident Investigation
• Employee Return to Work Process
TFR's Quality Control Overview
The purpose of our Quality Control Plan is for TFR to establish a quality control system to
perform sufficient inspections and tests of all items of work, including that of our
subcontractors, to insure conformance to applicable specifications and drawings with
respect to the production, quantities, field activities, materials, workmanship, construction,
finish, functional performance, and identification. This control will be established for all
activities except where the special provisions and the technical provisions of the contract
provide for specific government control by inspections, test, or other means.
The TFR control system will specifically include the
rs o t
,r colt ��c,,�f surveillance and tests required in the technical provisions
v_ saof the contract specifications. Both on site and off site
CERTIFICATE fabrication will be controlled and keyed to the proposed
a r v: construction sequence. The personnel assigned to the
04M^ - Quality Control Section will also be charged with the
-- �-- _---` a:;a responsibility of policing TFR's approved safety
program as required by the Accident Prevention Plan of
the contract specifications.
54
QIUFIHU Enterprises, bc.
DISASTER RESPONSE DIVISION
The Quality Control Plan will include at least three phases of inspection for all technical
provisions of the specifications as follows:
Preparatory Inspection:
1. This inspection is to be performed prior to beginning any work on a section of the
technical provisions of the specifications.
2. The inspection will include a review of contract requirements; a check to assure that
all materials and/or equipment have been tested, submitted, and approved.
3. Check to assure that provisions have been made to provide required control testing.
4. Examination of the work area to ascertain that all preliminary work has been
completed.
5. A physical examination of materials and equipment to assure that they conform to
approved shop drawings or submittal data and that all materials, certificates, and
other submittal data prior to submission to the contracting officer.
6. Each submittal offered to the contracting officer for approval will bear the date and
signature of a member of TFR's Quality Control organization indicating that he has
reviewed the submittal and found it to be acceptable (or showing the required
changes).
7. Review of the appropriate Activity Hazard Analysis to assure safety requirements
are met.
8. Discussion of procedures for controlling quality of the work including repetitive
deficiencies. Document construction tolerances and workmanship standards for that
feature of work.
9. Check to ensure that a client Representative has accepted the plan for the work to be
performed.
Initial Inspection:
An initial inspection will be performed as soon as representative segment of the particular
item of work has been accomplished and to include examination of the quality of
workmanship and a review of control testing for compliance with contract requirements, use
of defective or damaged materials, omissions, and dimensional requirements. This phase
shall be accomplished at the beginning of a definable feature of work. The following shall
be accomplished:
1. A check of work to ensure that it is in full compliance with contract requirements.
Review minutes of the preparatory meeting.
2. Verify adequacy of controls to ensure full contract compliance. Verify required
control inspection and testing.
3. Establish level of workmanship and verify that it meets minimum acceptable
workmanship standards.
4. Resolve all differences.
5. Check safety to include compliance with an upgrading of the safety plan and activity
hazard analysis. Review the activity analysis with each worker.
6. Notify an Edinburg Representative at least 24 hours in advance of the beginning of
41111 the initial phase. Separate minutes of this phase shall be prepared by the CQC
55
QLF.R. Eloc.
DISASTER RESPONSE DIVISION
® System Manager and attached to the daily CQC report. Exact location of initial
phase shall be indicated for future reference and comparison with follow-up phases.
7. The initial phase will be repeated for each new crew to work onsite, or at any time
acceptable specified quality standards are not being met.
Follow Up Inspections:
Follow-up inspections will be performed daily or as
frequently as necessary to assure continuing compliance with -
=MUM=
contract requirements, including control testing, until
completion of the segment of work.
Records: TFR will maintain current records of all inspection
and test performed on the format detailed, entitled Quality
Control Report. This form will provide factual evidence of
the required inspections or tests involved, results of --�`
inspections or tests, nature of defects, causes for rejection, Y...�
etc., proposed remedial action and corrective actions taken.
TFR's records will cover both conforming and defective ,
items and must include a statement that all supplies and
materials incorporated in the work are in full compliance
with the terms of the contract. Legible copies of these records
will be furnished to a client representative daily.
® Site Specific Quality Control Plan
The site or Contract specific QC Plan must accomplish the complete daily documentation of
operations, utilization and production, safety, and variations from normal operations of a
debris management operation. It must be in place and approved for use prior to beginning
any field operations, including site preparation. It must be in full compliance with contract
requirements.
Multiple forms are usually formatted for the Plan, which cover different activities. A
summary general Daily form is also usually formatted for the project that is completed by
the CQC Officer, and totals of all activities reported on summary forms. Usually, all
originals and one set of copies are delivered to a designated representative, and TFR keeps
two copies of each form.
Quality Control Organization
The duties and specific areas of responsibility of the various members of the Quality Control
Organization are as follows:
Operations Manager: Advises all supervisory personnel including, but not limited to, Sector
superintendents and key foremen assigned to critical areas, of the requirements of the
specifications and advises supervisors concerning methods to be used and the degree of
workmanship required.
56
Ever rises bc.
QLFUR. p .
DISASTER RESPONSE DIVISION
4111 Quality Control Officer: The Quality Control Officer is responsible for the direct
supervision of all superintendents and subcontractor and superintendents to ensure that the
work is being performed according to the Contract Plans and Specifications and TFR's
Contractor Quality Control Program. He/she will supervise the Quality Control Personnel
and advise other job personnel in advance of Quality Control Requirements; submittal
material, inspections, etc. of their work. When work does not comply with contract
requirements, he will immediately advise the Project Manager and together they will decide
what corrective action should be taken. The corrective action taken will be shown in the
daily log. The designated Quality Control Supervisor will have full authority in
implementing the Quality Control Program and the Safety Program of TFR Enterprises, Inc.
Quality Control Technician: Performs
inspections as directed by the Quality TFR CQC System s. operations Val
Control Supervisor and reports any `r(ofHeer>
deviations from the contract directly to CQC Project Manager
(Officer)
the Quality Control Supervisor.
Sector Supea.• (€)
CQC
A chart, documenting the TFR's Quality
Control organizational structure 4
Load&Haul 1DSR Site Debris I 6sine arina Chipping/
Foreman& Foreman& Separation Foreman& C,nding
Daily Reporting Procedures _ & QC &Q
The CQC Plan and the TFR Quality
® Control Manager shall address the
Recording and Reporting requirements
with all levels of supervisors and Crew Foremen. Different levels will have different
requirements. All final versions of all forms will be approved with the final CQC Plan,
including any additional required modifications. This discussion shall include the general
procedures set forth below:
• All loading and hauling crews are under the direction of a TFR supervisor.
• Daily reports are maintained by the crew foreman and recoding all equipment down
time for repairs on the daily reports.
• Hours, of each piece of equipment and each employee, are recorded and reconciled
with our client representative daily.
• Daily Reports shall have daily and year-to-date totals for each piece of
equipment/personnel tasked.
• Signatures of both TFR's representative and by a client representative are required
on all Daily Reports.
The TFR Quality Control Officer shall prepare, sign and submit to our client representative
a Quality Control Summary Sheet. This report at a minimum shall include originals and one
copy of all levels of QC reports received and in addition shall include a summary of safety
issues, infrastructure damage, total numbers of trucks loaded, equipment and plant hours
worked and idled or down, testing performed and by whom, loads and quantities hauled to
DMS, quantity of debris reduced, number of subcontractors working, contract non-
compliance issues and all corrective actions.
57
QIUFUHI Enr rises, Ic.
p
DISASTER RESPONSE DIVISION
Inspection Methods and Procedures
During work on the contract the Quality Control personnel will perform the required
inspections on both the TFR's and subcontractor's work. The staff that performs the Quality
Control inspections will be charged with the following duties:
1. Maintain and keep in serviceable condition, all machinery and materials.
2. Take whatever corrective action is necessary to replace or repair deficiencies
observed at anytime that affect the operation of machinery and materials.
3. Inspect for compliance with contract requirements.
4. Maintain copies of Inspection Records.
Detailed below are the procedures and methods that will be implemented:
Safety Issues: The role of QC in support of safety is to document that the safety plan
provisions are being followed. At each level, the Quality Control Report has appropriate
reporting requirements for safety, including worker protection, equipment safety, trimming
of loads, flagmen, work zone safety and traffic control. Each level of Quality Control Report
for each activity should have a section addressing daily safety meetings, issues and
activities.
Debris Eligibility: TFR should be handling only materials authorized by our contract. The
CQC Officer shall train the field ROW personnel on these materials classifications, and
® shall include the general eligibility requirements set forth below:
Eligible Debris
C&D Debris is non-burnable debris and can consist of recyclable as well as non-recyclable
debris that will eventually be delivered to a landfill. Samples of this type of debris include,
but are not limited to, mattresses, clothing, masonry, concrete, asphalt, metals, plastics,
lumber, manufactured furniture, building components, etc.
Vegetative Debris is burnable debris of natural origin such as grass, shrubs, and trees and
can be reduced and/or recycled by either incineration or by chipping/grinding.
Household Hazardous Waste (HHW) is debris of a chemical nature and includes such items
as household chemicals, pesticides, liquids, paint, batteries, waste oil, waste fuels,
antifreeze, spray cans, etc.
White Goods refers to items such as refrigerators, air conditioners, freezers, etc. which may
contain chemicals or fluids such as Freon or oil, which must be remediated by someone with
the appropriate license and certifications to do so.
Metals, both Ferris and non-Ferris such as copper, aluminum, steel or iron and which may
include parts from automobiles, trucks, bicycles, small engines, buildings, small appliances
and other items.
Ineligible Debris
Any debris which is not located on the ROW, regardless of category, i.e., C&D, Vegetative,
Household Hazardous Waste, White Goods, or Metals is INELIGIBLE DEBRIS. Debris
removal from private property is the responsibility of the individual property owner. No
TFR crews or subcontractors can work for the private sector while under
58
QUO. EInc.
DISASTER RESPONSE DIVISION
employment/contract to TFR Enterprises, Inc., during the duration of the Project/Task
Order. Fallen trees located on public property but in an unused forested or wilderness area is
ineligible unless specifically directed otherwise by a client Debris Manager.
Daily household garbage, or what could be classified as Municipal Solid Waste (MSW), is
ineligible debris.
Debris which is not the result of the disaster event, for example, debris from demolition that
was performed before the disaster event occurred, is ineligible debris.
Segregation of Debris at Curbside Pick Up
1. All loading operators are also instructed of the importance of maintaining
segregation of eligible debris when loading.
2. All vegetative debris will be loaded on trucks hauling vegetative debris only. If other
debris is encountered alongside the vegetative debris, it will be left at the curbside to
be later loaded on the trucks hauling whatever type of debris that is left.
3. Separate trucks will be used for loading Construction and Demolition debris.
4. Metals and white goods will also be loaded and hauled separately.
5. Any household hazardous waste shall be left at the curbside for the HHW crew to
load and haul.
6. When possible, any "mixed piles" of debris encountered at the curbside will be
separated by hand before loading. If it is not practical to separate the mixed piles at
the curbside by hand, the mixed piles will be loaded on separate trucks and the load
ticket will indicate "mixed debris."
Loading:
1. All Loaders will have been previously inspected at the staging area for safety and
compliance before being dispatched to the loading location.
2. All Loader operators will receive safety briefings before beginning loading
operations.
3. Flagmen will be located ahead of loading operations to direct and control traffic.
4. All flagmen will be properly attired and wearing safety equipment including hard
hats, safety shoes, reflective vests and carrying traffic directing flags.
5. All flagmen are under the supervision of the crew foreman.
6. Operators are cautioned to be observant and conscious of their surroundings at all
times, in particular being aware of hanging and downed power lines and structures
hidden by debris, such as fire hydrants, water mains, fences, etc.
7. Operators are cautioned not to overload trucks with debris so that the transporting of
the debris could cause the excess debris to become dislodged and fall into traffic
areas.
8. Operators are cautioned to stay on the rights of way and not to enter private property
during the loading process.
9. Operators are equipped with mobile radios and are supervised by crew foreman.
10. Operators are instructed to keep the debris loads segregated between (a) burnable
(vegetative), (b) non-burnable (C&D), (c) mixed piles where C&D, non-burnable,
and vegetative are co-mingled and cannot efficiently be separated at the curbside, (d)
other (such as household hazardous waste [HHW])
59
QJIF.H. EIC.
DISASTER RESPONSE DIVISION
11. Household hazardous waste (HHW) crew, trained in EPA requirements for handling
of HHW, will load HHW materials, (household cleansers, butane, poisons, etc.) at
the curbside by hand in a specially equipped compartmental truck. HHW will be
delivered to the collection point designated by the client Debris Manager.
12. As it is TFR policy, Loading and Hauling Crews shall complete all debris clearing
operations that have been started on any particular pass through a neighborhood, and
shall not "skip" through designated work areas for"gravy" loads.
13. All Loading and hauling crews are under the direction of a TFR supervisor. Daily
reports are maintained by the crew foreman and record all equipment down time for
repairs on the daily reports. Hours, of each piece of equipment and each employee,
are recorded and reconciled with the client representative daily.
14. In the event of notice of a violation as a result of the actions of any employee or
subcontractor, the Operations Manager will take immediate corrective action and
follow up on the enforcement of such action and so notate in his daily log record.
Hauling:
1. All Trucks will have been previously inspected at the staging area for measurement,
numbering, safety and compliance before being dispatched to the loading location.
2. All truck operators will be instructed to observe traffic regulations and follow the
instructions of the flag persons.
3. All truck operators are to wear safety equipment, hard hats and steel-toed shoes.
4. Truck operators are not allowed to leave with "overhanging" loads. Loads will
® either be trimmed or reloaded before being allowed to leave the loading area.
5. It is the truck operator responsibility to check and determine that his load is safe
before leaving the loading site.
6. Truck operators are equipped with mobile radios and are supervised by crew
foreman.
7. Truck operators will be issued a "load ticket" and at the loading site and will deliver
the ticket to the inspector at the dumpsite.
Dumping:
1. Dumping operations will be at the DMS or at a landfill/disposal site designated by
the client Debris Manager.
2. All traffic regulations and speed limits will be observed at the dumpsite.
3. Truck operators will report to the weigh station and deliver their "load ticket" to the
TFR QC and client QA for inspection and approval before proceeding to dump
his/her debris.
4. Each truck operator will be directed as to where to dump each load at the dumpsite
location by the designated dumpsite operator.
5. Each truck operator will inspect his truck and tailgate after the dumping process is
completed to assure that it is secure before leaving the dump area.
6. Truck operators will follow the designed traffic flow when leaving the dump and
return to the designated loading area.
60
QJ.FIH. Eoterprises, lc.
DISASTER RESPONSE DIVISION
Private Property (ROE) Program Procedures: •
The Company's Quality Control Manager shall discuss the requirements and procedures for
the removal of debris from private property under the Right of Entry (ROE) Program with
all Crew Foremen. This discussion shall include the general procedures set forth below:
1. Before a demolition project on private property can begin, a ROE document must be
executed, including:
a. Authorization to enter the property for demolition but a
b. Hold Harmless Agreement accompanied by a non-duplication of benefits
agreement from the client.
2. TFR crews are not permitted to enter private property except at the direction of TFR
ROE Manager or a client representative.
3. Proper completion of a TFR ROE Program Checklist
a. HHW crews will be assigned to remove any hazardous materials from the
property.
b. All HHW materials will be cataloged and disposition defined.
c. All utility connections will be inspected to ensure that they are disconnected
After demolition, all materials can be either placed on the right of way to be picked up under
the debris removal agreement or taken directly to the DMS for separation and disposal.
Rental of Equipment with Operators:
1. Inspection and Identification of Equipment & Materials before any machinery or
materials are placed in use; they shall be inspected and tested by competent
personnel. The Contractor's personnel will perform such duties.
2. The contractor's personnel chosen by the Quality Control Officer will perform
inspection of all machinery and materials daily.
3. Records of inspections shall be maintained at the site and shall be available on
request to the client representative.
4. Preventative maintenance procedures recommended by the manufacturer shall be
followed.
5. All repairs on machinery or materials shall be made at a location, which will provide
protection from traffic for repairmen. Any machinery or equipment found by the
contractor to be unsafe would be shut down until unsafe conditions have been
corrected.
6. Only TFR designated personnel shall operate machinery and mechanized equipment.
7. The Quality Control Supervisor shall instruct all operators in the use and details of
Safety Operations.
8. Operators of machinery will establish and confirm requirements daily as to comply
with contract documents with TFR's representative.
9. Equipment: Material deficiencies observed shall be reported to the proper TFR
personnel for correction.
10. All safety procedures will be used in accordance with TFR's Accident Prevention
Plan.
® 11. All phases of work being performed will be inspected daily by the responsible
member of the Quality Control team.
61
Cjil.R. Eurprises,teIRc.
DISASTER RESPONSE DIVISION
® Damage Control and Reporting
The goal of sound debris removal is to protect the public and private infrastructure and the
overall health of citizens while collecting and disposing of debris rapidly. TFR is fully
committed to this end and strives for a goal of ZERO claims. TFR takes a proactive
approach to the protection of infrastructure. During "Toolbox" Meetings, TFR's Quality
Control Officer shall address the following general procedures to avoid careless activities
during collection:
• Operators are reminded to stay on the rights of way and not to enter private property
during the loading process.
• Operators are cautioned to be observant and conscious of their surroundings always,
in particular being aware of hanging and downed power lines and structures hidden
by debris (such as fire hydrants, water mains, fences, etc.).
• Operators are cautioned about debris weight distribution to be maintained during the
loading process.
• Operators are instructed not to overload trucks with debris in such a manner that the
transporting of the debris could cause the excess debris to become dislodged and fall
into traffic areas or snag low or hanging power lines.
• Debris shall not hang over vehicle sides or extend more than 24 inches above the
sides. Overloaded trucks shall be trimmed or removed prior to departing the loading
area as instructed by the Crew Foreman.
® However, a few claims are unavoidable. TFR maintains a strict Damage Control and
Reporting Procedures to ensure that each claim is handle with expediency and care while
meeting the needs of the claimant. TFR's Quality Control Officer shall address the Damage
Control and Reporting Procedures with all field ROW personnel during initial safety
meetings. Crew Foreman's are required to report all damages directly to the Quality Control
Officer immediately. Upon notification, the Quality Control Officer will prepare a Damage
Report without delay, and is instructed to seek the following information:
1. Name, address and phone number of property owner.
2. Who was present when the accident took place?
3. Detailed description of what happened, including what activity was being
performed at the time of the damage, why did it happen and documenting
all unsafe conditions, equipment and/or acts.
4. To the best of the witness's knowledge, was there a previously known
and/or reported problem or condition associated with the accident?
Follow-up:
1. Date, time and record of TFR's Quality Control personnel that investigated
the damage.
2. Date, time and record of when and who (property owner) was contacted
and notes as to what was discussed or agreed.
3. Date and time of repair, or resolution agreement.
62
T.F.R. Eutorprises, lc.®
DISASTER RESPONSE DIVISION
TFR will investigate all damages and complaints and make resolutions within 24 hours. If a
resolution was reached, a copy of the Quality Control Officer's Damage and Claim Release
Form shall be attached to the Report. If a resolution is not agreed to between the property
owner and TFR, TFR shall provide its General Liability Carrier with all the necessary
information. All Damage Reports will be maintained in a file in TFR's Field Office. A
catalog of all information and supporting action on each incident will be provided to our
client weekly in a condensed list, available upon request.
Environmental Overview
TFR is committed to protecting the environment and preserving the Nation's historic
resources while complying with applicable Federal environmental and historic preservation
laws such as:
• National Historic Preservation Act
• National Environmental Policy Act
• Endangered Species Act
• Clean Water Act
• Clean Air Act
• Coastal Barrier Resources Act
• Migratory Bird Treaty Act
• Resource Conservation and Recovery Act
• Coastal Zone Management Act
40 • Farmland Protection Policy Act
• Fish and Wildlife Act
• Wild and Scenic Rivers Act
• Magnuson-Stevens Conservation and Management Act
• Executive Order 11988, Floodplain Management
• Executive Order 11990, Protection of Wetlands
• Executive Order 12898, Environmental Justice
The primary potential environmental impacts occur from activities related to debris
management sites, the individual demolition sites, and transportation activities associated
with moving debris and waste along with general transportation activities.
A comprehensive Environmental Protection Plan will be prepared and submitted within five
days of notice of award. It will identify specific debris management sites and specific
impacts associated with the location(s). This includes site-specific information such as depth
to water table, distance to potential receptors and pathways and the site setting parameters
that may be affected by activities such as dust, odor, noise, traffic, etc. Until the specific
debris site is identified, the Environmental Protection Plan cannot be finalized.
This framework is intended to demonstrate our familiarity with the requirement and our
ability to deliver the submittal plan as required. It's not intended to be a complete or
thorough model for the Environmental Protection Plan.
Pathways to be evaluated and issues to be addressed in the Environmental Protection Plan:
63
QI.F.a. EInc.
DISASTER RESPONSE DIVISION
• • Air/Dust, Odor, Gases, Smoke
• Water/Storm Water Runoff/Erosion Control, Leaching into Water Table
• Esthetics & Community Relations -Setbacks, Noise, Traffic, Hours of Operation,
Tree Preservation, Site Restoration
• Spills and Spill Response
Special Considerations:
• Wetlands Protection
• Ground Water Recharge and Discharge
• Aquatic Food Chain Support
• Fish and Wildlife Habitat
• Fire/Rodent/Wind/Hauling Control
Primary considerations also include prevention of soil erosion and sedimentation, improved
air quality, reduced noise pollution, energy conservation through site layout and design,
protection of privacy by maintaining and establishing buffers between conflicting land uses
and maintaining or enhancing habitat for wildlife through final restoration.
TFR Enterprises Invoicing Procedures
TFR prefers to invoice on a weekly basis, with a one-week delay. If the client is utilizing the
services of a Monitoring Firm, it is likely that an Automated Debris Management System
will be utilized. TFR is well versed in the use of these systems and is very experienced in
the necessary reconciliation. These systems have greatly reduced the reconciliation burden
of all parties.
If an ADMS system is not used, TFR will provide all of the necessary paperwork for the
proven paper-based documentation process. This process consists of:
• Ticket Data is aggregated, summarized and supplied to the monitoring firm or client
for reconciliation
• Once the data has been completely reconciled, the invoice is then presented for
payment
64
QT.F.H. EDOT.F.R. [11101111SOS, e.
DISASTER RESPONSE DIVISION
Exceptions
TFR has no exceptions regarding any requirements stated in the RFP document or
associated addendums.
Current Inventory
Description Company Owned Subcontractor Owned
Tub Grinder(Diamond Z- 10001IP). 8 12
Horizontal Grinder 2 5
Stump Grinder 2 30+
Excavators 13 37
Wheel Loaders 4 46
Track Loaders 3 64
Bulldozers 17 16
Air Curtain Incinerator 4 10
Skid Steer 4 100+
Self-Loading/Knuckleboom Trucks 16 300+
Pup-Trailers 7 100+
Truck Tractor 7 500+
Walking Floor Trailers 7 100+
Low Boy Trailers 4 18
® Service Trailers 5 8
® Flat Bed Trailers 6 100+
Bucket Trucks 2 100+
Service Trucks/Foreman Vehicles 17 50+
Office Trailers 5 50+
Light Towers 2 50+
Air Compressor 2 75+
Turf Rake 1 10+
Power Screen 2 10+
Water Truck 2 10+
65
CITY_.OF SUNNY ISLES BEACH-
`1807.0..Collins.Avenue -
µNY,J
Sunny Isles.Beach, Florida 33160. • f 5�<Ff
-� • • 345:947.0606 !.-4,i,.°/^
• www.sibil.net � � -
'"s. '' P
F .;7.-0-‘'''a 50,
i4"OF SUN Pa
DELIVER TO: REQUEST FOR PROPOSAL OPENING:
City of Sunny Isles Beach SECTION 6
CityThursday, May 10, 2018 2:30 PM
Clerk BID SUBMITTAL FORMS
18070 Collins Avenue
Sunny Isles Beach, FL 33160
PLEASE QUOTE PRICES, LESS TAXES, FOR THE
CITY OF SUNNY ISLES BEACH, FLORIDA
NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Bid price should be
less all taxes. Tax Exemption Certificate furnished upon request.
Issued by: Purchasing Agent Date Issued: This Bid Submittal Consists of
IIIGenesis Cuevas 04/25/2018 Pages 44+
Sealed bids are subject to the Terms and Conditions of this Request for Proposal and the accompanying
Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or
incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address
shown above until the above stated time and date, and at that time, publicly opened for furnishing the
supplies or services described in the accompanying Bid Submittal Requirement.
RFP 18-04-02
DISASTER DEBRIS MANAGEMENT AND DISPOSAL SERVICES
Procurement Agent: Firm Name:
Genesis Cuevas t P j ses, Inc-
Commodity
nc-Commodity Code(s):
RETURN ONE ELECTRONIC COPY(FLASHDRIVE OR CD) ONE ORIGINAL AND FOUR COPIES
OF BID SUBMITTAL PAGES AND AFFIDAVITS
FAILURE TO SIGN PAGE 47 OF SECTION 6 BID SUBMITTAL WILL RENDER YOUR BID NON-
RESPONSIVE
ill
City of Sunny Isles Beach I RFP Disaster Debris Management and Disposal Services 18-04-02 44 .
•
• CITY OF SUNNY ISLES BEACH
18070 Collins.Avenue
CD • Sunny Isles Beach, Flotilla 33160 svt1NY <F
305 947.0606 °ra^-` ��e
www.sib;l.net ,'� �\
' FIO°`
Cir OF SUN P�
BID SUBMITTAL FOR:
ACKNOWLEDGEMENT OF ADDENDA
INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES
PART I:
LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS
BID p
Addendum #1, Dated s I.aUI D
® Addendum #2, Dated
Addendum #3, Dated
Addendum #4, Dated
Addendum #5, Dated
Addendum #6, Dated
Addendum #7, Dated
Addendum #8, Dated
PART II:
❑ NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID
FIRM NAME: --r-Fe. E ak,priSeS l I VT C-
AUTHORIZED SIGNATURE: 1 DATE: qq/ig
® TITLE OF OFFICER: OFip
City of Sunny Isles Beach I RFP Disaster Debris Management and Disposal Services 18-04-02 45
- - CITY OF SUNNY,ISLES BEACH
- P$070;Collins.Avenue
NNY f1
Sunny Isles:Beach Florida 33160 s�
• 305.947.0606
•
www.sibfl.net `n
• -
a P
1.y OF SUN PTS
•
BID SUBMITTAL FORM
Bid Title: DISASTER DEBRIS REMOVAL AND DISPOSAL SERVICES
The undersigned Contractors proposes and agrees, if this Bid is accepted, to enter into an agreement with
The City of Sunny Isles Beach to perform and furnish all Work as specified or indicated in the Contract
Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with
the other terms and conditions of the Contract Documents.
The Contractors accepts all of the terms and conditions of the Advertisement and Instructions to
Contractors, including without limitation those dealing with the disposition of Bid Security. This Bid will
remain subject to acceptance for 90 days after the day of Bid opening. The Contractors agrees to sign and
submit the Agreement with the Bonds and other documents required by the Bidding Requirements within
ten days after the date of the City's Notice of Award.
In submitting this Bid, the Contractor represents, as more fully set forth in the Agreement, that:
• The Contractor has familiarized himself/herself with the nature and extent of the
Contract Documents, Work, locality, and all local conditions and Law and
Regulations that in any manner may affect cost, progress, performance, or
furnishing of the Work.
• The Contractor has studied carefully all specifications and requirements.
• The Contractor has given the City written notice of all conflicts, errors,
discrepancies that it has discovered in the Contract Documents and the written
resolution thereof by City is acceptable to the Contractor.
• This Bid is genuine and not made in the interest of or on behalf of any undisclosed
person, firm or corporation and is not submitted in conformity with any agreement
or rules of any group, association, organization, or corporation; the Contractor has
not directly or indirectly induced or solicited any other Contractors to submit a
false or sham Bid; the Contractor has not solicited or induced any person, firm or
corporation to refrain from Bidding; and Contractor has not sought by collusion to
obtain for itself any advantage over any other Contractors or over the City.
The City and the successful Contractor will establish completion times for each individual Work Item and
the successful Contractor agrees that the work will be completed within the time frames agreed upon and
stipulated in the individual Purchase Orders and/or Notice to Proceed.
411111
City of Sunny Isles Beach I RFP Disaster Debris Management and Disposal Services 18-04-02 46
- - CITY OF SUNNY ISLES BEACH-
18070Collins'Avenue
�- • Sunny-Isles-Beach Florido 33160 5)""Y 1S`Fs
.305.9.47.0666 °
ww .s bfl.net
�S - FL.-
'
FLO- c4
C�' OF SUN Pea
Firm Name: TR. C.V l krp/-I SeS'i /0C,
(idl t.eahcldr �rL ) 1 L rider 75c 730y/
Street Address:
Mailing Address (if different):
Telephone No. (SIa)dl'.0D-33aa Fax No. CS la) S9 s1111
Email Address: I■ I . . 1 l I •/, EIN No. )/ I/ I/gt'/U/6A
*By signing this document the proposer agrees to all Terms& Conditions
Signature:
(Signature of authorized agent)
Print Name: • / • • 2sltlia• ,it
Title: C
THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF CONTRACTOR
TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION
WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE
PROPOSAL NON-RESPONSIVE. THE CITY MAY, HOWEVER,IN ITS SOLE DISCRETION,ACCEPT
ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS
THE CONTRACTOR TO THE TERMS OF ITS OFFER.
•
City of Sunny Isles Beach I RFP Disaster Debris Management and Disposal Services 18-04-02 47 .
CITY.OF SUNNY,ISLES BEACH"
18070 Colhns:Avenue •.
J
Sunny Isles Beach, florid° 33160,
305 947 0606
C11
30-5
u""Y'\\e
.
www.sibFl.netd2
•
O
`"Y OFsUNP�
Section 7
QUALIFICATION STATEMENT
Check one:
Submitted By: i Q f(�_F. gp�1� Corporation
Name: (TFe, s /r�C_ ❑ Partnership
Address: _L oL_LQanc1 er br ❑ Individual
City, State, Zip Lowder) •7 , , �(,�9 � ❑ Other
Telephone No. (5j a) c( ._1J -330a ex-I-. ROO
Fax No. (?) Sag- iqqa
1. Indicate registration, license numbers or certificate numbers for the businesses or
professions, which are the subject of this Bid. Please attach certificate of
competency and/or state registration.
PC1L
2. Have you ever failed to complete any work awarded to you? If so, state when, where
ands
Ki IV
3. State the names, telephone numbers, emails and last known addresses of three (3)
owners, individuals or representatives of owners with the most knowledge of work
which you have performed and to which you refer(government owners are preferred
as references).
City of Sunny Isles Beach I RFP Disaster Debris Management and Disposal Services 18-04-02 48
CITY OF SUNNY ISLES BEACH
1807.0;Collins Avenue'
° Sunny Isles Beach, Florida03160 ,uµ"`este
305.947.0606 � \�
www,sibil.nel C7�.
''S �• cioa' 4�P
O
C`lr OF sus F
Pleb e enols Y'CPCre6 ces
4. List the pertinent experience of the key individuals of your organization (continue on
insert sheet, if necessary).
Sem �r�c l � _res n es.
5. State the name of the individual who will have personal supervision of the work:
R; me,sia (sia) um -IYaa
to sas(o q _3V}iaLLCOfr?
6. State the names and ad sses of all businesses and/or individuals who own an
interest of more than five percent (5%) of the Offeror's business and indicate the
percentage owned of each such business and/or individual:
►_Q-bn_F • ecx0 a,r)cd 100% S±�cLb /der
_laDas Cedar s reo-i-
} T . )23a
7. State the name of Surety Company which will be providing the bond, and name and
address of agent:
�',�a4d. i_n_GD_\4, alien=BroLicGaichzi_
411 5q P_r_ec n_V_i_ELo_ l ud._ste ao_a ttas_,56z759'io
City of Sunny Isles Beach I RFP Disaster Debris Management and Disposal Services 18-04-02 49
•
- . CITY OF SUNNY ISLES BEACH-
• - • 1807.0.Collins Avenue
- Sunny Isles Beach, Florida 33160 5°"N'r 1st,
305:947.0606 °I g
www.sibfl.net
FC�Jr or SUN P4
0
8. Attach a financial statement including Contractor's latest balance sheet and income
statement showing the following items:
a) Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes
receivable, accrued income, deposits, materials, real estate, stocks and bonds,
equipment, furniture and fixtures, inventory and prepaid expenses):
b) Net Fixed Assets
c) Other Assets
d) Current Liabilities (e.g., accounts payable, notes payable, accrued
expenses, provision for income taxes, advances, accrued salaries, real
estate encumbrances and accrued payroll taxes).
e) Other Liabilities (e.g., capital, capital stock, authorized and outstanding
shares par values, earned surplus, and retained earnings).
9. State the nametof the firm preparing the financial statement and date thereof:
Uan [z�c.,c.�-e.r) RacukS
11. Litigation/Judgements/Settlements/Debarments/Suspensions — Submit information
on any pending litigation and any judgements and settlements of court cases relative
to providing the services requested herein that have occurred within the last three
(3) years. Also indicate if your firm has been debarred or suspended from bidding or
proposing on a procurement project by any government entity during the last five (5)
years.
(\ioa
•
City of Sunny Isles Beach I RFP Disaster Debris Management and Disposal Services 18-04-02 50
CITY OF SUNNY ISLES BEACH
1807.0.Collins Avenue
Sunny Isles.Beach, Florida 33160 se""''rs<F
305 947.0606 ,
www.sibfl.net LS!
C11.Y OF Ws
O
•
SCHEDULE 1 LABOR CATEGORY HOURLY LABOR RATE
Operations Manager w/Cell Phone and.5 Ton Pickup Truck $ ,CO T
1.1. /IJyV)
Crew Foreman w/Cell Phone& 1 Ton Equip,Truck w/small tools and $ r ��
1.2. misc.supplies in support of crew G�-l�J '
Tree Climber/Chainsaw and Gear $
1.3. L OCo
Laborer w/Chainsaw and Gear
1.4. $ S'OV
Laborer w/Small Tools,Traffic Control,or Flag Person $ O'OC)L5.
Li
Bonded and Certified Security Personnel $
1.6. /(
] IO I W
OTHERS NOT LISTED IN LABOR CATEGORY-PLEASE LIST
BELOW
•
SCHEDULE 2 LOADING, REDUCING AND HAULING CATEGORY PER CUBIC YARD
2.1. Vegetative Debris Removal (based on Section 3.9)
Work consists of the collection and transportation of eligible
vegetative debris on the ROW or public property to a City
approved debris management site(DMS)or City approved final $
disposal site. This proposed rate shall apply to Removal of +4 b0
Debris from City Parks& Facilities.
2.2. C&D Debris Removal (based on Section 3.10)
Work consists of the collection and transportation of eligible $
C&D on the ROW or public property to a City approved debris I 1 OU
management site(DMS) or City approved final disposal site.
City of Sunny Isles Beach I RFP Disaster Debris Management and Disposal Services 18-04-02 53
•
- • CITY OF SUNNY ISLES BEACH
1807.0.Coll ins'Avenue
Sunny Isles.Beach, Florida 33160_
305.947.0606•
www.sibfl.net
,i Kwrt)•
fc1J'OFSUS PN
2.3. DMS Operation and Debris Management and Reduction
(based on Section 3.18)
Work consists of managing and operating DMS for acceptance,
management, and reduction of eligible C&D and vegetative $
disaster related debris. Management and Operation of a L
Temporary Debris Staging and Reduction Site per incoming
Cubic Yard.
2.4. Mileage for Haul-out to Final Disposal Site within 25 miles
from DMS (based on Section 3.19)
Work consists of transporting eligible disaster related debris to
a City approved final disposal site within 25 Miles from the $ 00
DMS. Distance is measured as the crow flies and rounded to
the nearest mile.
2.5. 26-50.9 Miles
$ W
2.6. 5l+Miles (Q ,so
Removal of Hazardous Trees and Limbs (based on Section
3.14) Work consists of removing eligible hazardous trees or
limbs and placing them on the safest possible location on the $
2.7. City ROW for collection under the terms and conditions of `!5 ,00
Scope of Services Item 2,Vegetative Debris Removal. Sizes as
follows:
6 inch to 23.99 inch diameter each $
2.8. n6 .00
24 inch to 35.99 inch diameter each $ tC '
2.9. D6
CO
36 inch to 47.99 inch diameter each $ '\
2.10. C5()
°
48 inch and larger diameter each $ I�JJ
2.11. O�
� W ,
Removal of Hazardous Stumps (Based on section 3.15)
Rate includes removal, backfill of stump hole, reduction, and
2.12. final disposal. Sizes as follows: 24.1 inch to 36.99 inch $
diameter 100
® 37 inch to 48.99 inch diameter $2.13. a V0 ,CO
City of Sunny Isles Beach I RFP Disaster Debris Management and Disposal Services 18-04-02 54
•
' - CITY OF SUNNYISI.ES BEACH
1807.0:Collins'Avenue
Sunny Isles Beach, Florida 33160 1"" 's<F�
e305947:0606 {} \F
. www.sibfl.net ,r (
•
!'ff ''1.0&'') S
C,I. OF SUN O
'
49 inch and larger diameter
2.14. 300,00
Household Hazardous Waste Removal, Transport, and
Disposal (based on Section 3.11) Work consists of the
$
2.15. collection, transportation, and disposal of household 5,00 PER POUND
hazardous waste from the ROW to a City approved permitted
hazardous waste facility or MSW type I landfill
410
0
City ofSunnyIsles Beach I RFP Disaster Debris Management and Disposal Services 18-04-02 55
CITY OF SUNNY ISLES BEACH-
1807.0,CaIlins".Avenue. _
Sunny Isles_Beach, Florida 33160. SAN" 'Ie
• 305.947.0606 ,°„1 . .� F
www.sibfl.net �L; i. J c —
. C7 yr '
`'SteP
!' '<• r.OQ�-
O
fC,Tr OF SUN
�
EQUIPMENT TYPE (OR INDICATE
SCHEDULE 3 EQUIVALENT) WEATHER LEASED HOURLY LABOR RATE
WITH OPERATOR CATEGORY OR OWNED
3.1. 50' Bucket Truck $
OctOn d 3S•CO
3.2. Dozer,Tracked, D3 or Equivalent �/� $
co3 1 Bio ,oo
3.3. Dozer,Tracked, D4 or Equivalent ��/ j,^ $ qc ,oO
3.4. Dump Truck, 16 +/-CY $ •
lal
3.5. Dump Truck, 20 +/-CY V $ I S�,
lease 1 Loss CO
3.6. Dump Truck, 38 +/-CY $
Lease 1"1s. co
3.7. 100 KW Generator $
®
Le as e_ ods. C .)
3.8. 300 KW GeneratorL-eC�S e.. $ 56,00
3.9. 500 KW Generator $
Lease- )5, co ,
3.10. 1000 KW GeneratorLeo G e--, $ ^1 .
3.11. Light Plant with Fuel and Support $ (
3.12. Gradere w/12" Blade(Min. 30,000 �/� $
� q0 .00
3.13. Lowboy Trailer w/ Tractor of $ I I o ,OD
3.14. Mobil Crane up to 15 Tont J�n Q c� $ ^bO
3.15. Pump,95 HP(Minimum 25' Intake J $ Qf
and 200' Discharge to Include Fuel pupil a D0,ice3
and Support Personnel) LJ�-�
3.16. Single Axle Dump Truck, 5–12 cu. $
yd. Iso i 00
3.17. 753 Bobcat Skid Steer Loader with $
debris grappler J 1 Hs.OQ
3.18. Pickup Truck, 1 Ton (Ian $ / (�\ C)
3.19. Skid-Steer Loader, 1,500 LB S
® 9 aeprplejg Capacity(w/ utility own I , h 0
City of Sunny Isles Beach I RFP Disaster Debris Management and Disposal Services 18-04-02 56
- - CITY OF SUNNY ISLES BEACH . •
_ - '18070..Collins.Avenue'
. . - Sunny Isles.Beach;,(-- Flonda33160• - „”"Y i,t
306 947.0606 ° '-';`
www.sibfl.nef .e,:`c
,k,-F- L;., -
Q
'5',.-
C,lr OF SUN P‘4
3.20. Skid-Steer Loader, 2,500 LB $
Operating Capacity(w/ utility
bon coo
grapple) �UJ n ( lL
3.21. Compact Track Loader, 1,500 LB $
Operating Capacity(w/ utility ��,^ I ^0 �CatVl
grapple) y I J '
3.22. Compact Track Loader, 2,500 LB $
Operatingrapple) Capacity(w/ utility VY-�_/1 0151 OO
3.23. Tub Grinder,800 to 1,000 HP v �/( �� $
DLon
3.24. Hydraulic) Excavator, 1.5 cy(w/ ��� $ ��� �,1
thumb
3.25. Hydraulic Excavator, 2.5 cy(w/ $ , (�
thumb) °moo 1 o5. Ov
3.26. Flatbed Truck $
3.27. Articulated,Telescoping Scissor $
Lift for Tower,15 hp/ 37 ft. lift Lea c OS , 00
3.28. Water Truck, 2,500 gal (Non- $
Potable, Dust Control and DAY)
y ( /� `
Pavement Maintenance) LI CJ
3.29. Wheel Loader, 3 CY, 152 HP $ •
I Li5 . CICU
3.30. Wheel Loader,4.0 CY, 200 HPCtO� $ i 5c 00
3.31. Wheel Loader, l.5CY, 95HP6 6 $ 1�6-.0o
3.32. Tandem Axle Dump Truck, 16—20 $
cu.yd. Lea t€ iS5 , l/Y-1
3.33. Tandem Axle Dump Truck, 21 —30 $
cu.yd. L�qs € fcos. CSC.)
3.34. Handfed chipper $
Lei s- ' Dv
OTHER ITEMS NOT LISTED IN
EQUIPMENT CATEGORY-PLEASE
LIST BELOW
J
City of Sunny Isles Beach I RFP Disaster Debris Management and Disposal Services 18-04-02 57
- CITY OF SUNNY ISLES BEACH-
' 18070:Collins'Avenue
Sunny Isles Beach,'Florida 33160 "<F
305:947.0606 J
t ti
www.sibfl.net �
•
a I�
D\ V�PP
`s-se i, rLOa 44.
Cir 0.0
OF 51.1N'
SCHEDULE AS NEEDED -ADDITIONAL SERVICES UNIT RATE
4
4.1. Marine Debris Removal—Per CY S I g
00$
4.2. Removal of Abandoned Vehicles - Per Vehicle t a S 100
S
4.3. Dead Animal Carcasses - Per Pound • DCS
$
4.4. White Goods- Per Unit j „o )/,
v
4.5. Residential Drop-off Sites - Per CY 00
$ 5 vv
4.6. E-Waste- Per Unit
S
Authorized Signatory:
Executed by: /poi) F• /26(,()1a OJ
P(Type or print name)
S
City of Sunny Isles Beach I RFP Disaster Debris Management and Disposal Services 18-04-02 58
00.4NY islet
NON - COLLUSION AFFIDAVIT
City of Sunny Isles Beach
18070 Collins Avenue
' AD''•Fo ' '� Sunny Isles Beach,FL 33160
''OF :uµ'H Telephone:(305)947-0606 Fax:(305)949-3113
STATE OF F261i
)
COUNTY OF Cc////�Q fir)
The undersigned being first duly sworn as provided by law,deposes,and says:
This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be
relied upon by said County,in any consideration which may give to and any action it may take with respect to this RFP.
The undersigned is authorized to make this Affidavit on behalf of,
nnppriSes / lilC
(Name of Corporation,Partnership Individual,etc.)
a, (1 Dl Ot - ,formed under the laws of / !V
(Type of Busiinne'ss) (State)
of which he is ��LC�vI l tBuil •
(Sole Owner,Partner,President,etc.)
Neither the undersigned nor any person, firm, or corporation named above nor anyone else to the knowledge of the undersigned, have
410 themselves solicited or employed anyone else to solicit favorable action for this RFP by the City, also that no head of any department
or employee therein,or any officer of the City of Sunny Isles Beach, Florida is directly interested therein.
This RFP is genuine and not collusive or a sham; the person, firm or corporation named above has not colluded, conspired, connived or
agreed directly.or-indirectly with any proposers or person; firm or corporation, to put.in a sham.RFP, or that such person, firm or
corporation, shall refrain from Bidding,and has not in any manner,directly or indirectly,sought by agreement or collusion,or communication
or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements
contained in the RFP or RFP's described above true; and further, neither the undersigned, nor the person, firm or corporation named
above has directly or indirectly submitted said RFP or the contents thereof, or divulged information or data relative thereto, to any
association or to any member or agent thereof.
4C— CEO
AFFIANTS NAME AFFIANTS TITLE
TAKEN,SWORN AND SUBSCRIBED TO BEFORE ME thisill day of /hatl ,2018.
Personally Known V or Produced Identification •
Type of identification
(Affix seal here)
NOT Q =UC(n. e printed or type•
"� TIFFANY MIXES
mX. My Notary ID#123933814
:' ,o '••'F Expires January 27,2022
_•.0 ♦ I' 4 _ A—
O
1 of 10
SUNNY/SF
PUBLIC ENTITY CRIMES
v
City of Sunny Isles Beach
18070 Collins Avenue
o
•F Loa` 5 Sunny Isles Beach,FL 33160
o, sus' Telephone:(305)947-0606 Fax:(305)949-3113
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
PUBLIC ENTITY CRIMES
Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate
who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a
Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a
public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of
real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or
Consultant under a Contract with any public entity, and may not transact business with any public entity in excess
of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on
the convicted vendor list".
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER
OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted to City of Sunny Isles Beach
byf1tbv? F. nc.Jarirl j CEO
[print idivi 's name and title]
for Tit CrAerpf1SPG, Ir)C
[print name of entity submitting sworn tatement]
whosebusiness d�ss is: �
I Co i P.r vri x
lei ,
76. I
and (if applicable) its Federal Employer Identification number(FEIN) is ' 1 / 4/OA .
(If the entity had no FEIN, include the Social Security Number of the individual signing this sworn
statement: .)
2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a
violation of any state or federal law by a person with respect to and directly related to the transaction of
business with any public entity or with an agency or political subdivision of any other state or with the
United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any
public entity or an agency or political subdivision of any other state of the United States and involving
antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation.
3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a
finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any
federal or state trail court of record relating to charges brought by indictment or information after July 1,
1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere.
4. I understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means:
a.) predecessor or successor of a person convicted of a public entity crime; or
b.) Any entity under the control of any natural person who is active in the management of the entity
and who has been convicted of a public entity crime. The term "affiliate" includes those officers,
directors, executors, partners, shareholders, employees, members, and agents who are active in
the management of an affiliate. The ownership by one person of shares constituting a controlling
interest in another person, or a pooling of equipment or income among persons when not for fair
2 of 10
market value under an arm's length agreement, shall be a prime facie case that one person
controls another person. A person who knowingly enters into a joint venture with a person who
• ® has been convicted of a public entity crime in Florida during the preceding 36 months shall be
considered an affiliate.
5. I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural
person or entity organized under the laws of any state or of the United States with the legal power to
enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or
services let by a public entity, or which otherwise transacts or applies to transact business with a public
entity. The term "persons" includes those officers, directors, executives, partners, shareholders,
employees, members, and agents who are active in management of any entity.
6. Based on information and belief, the statement which I have marked below is true in relation to the entity
submitting this sworn statement. (Indicate which statement applies.)
/
•
Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, nor any
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of
(10 Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the
State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer
determined that it was not in the public interest to place the entity submitting this sworn statement on the
convicted vendor list. (Attach a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE
PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND,
THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO
A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA
STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM.
By: -64
(Sign, ur ))ii / ` ,�a
4...),,,,,,,i
(Printte�d Njamme
c ,---i-,
o
(Title) Q
Sworn an scribed b fore me this /m day of , 20 ig , by
"Tlekoo F- a .•:,• °`„1.: TIFFANY WIC q
1Lk
-: My Notary ID#123933814 a Signature – tate f-Fler�ide- T l S
;•.• ..r.•+" Expires January 27,2022'+ `. fOk4trAj
0q co/ f i.eS
. ✓ Print or Type Commissioned Name
ill
Personally Known OR Produced Identification
Type of Identification Produced
3 of 10
s,„N Y
EQUAL OPPORTUNITY /
u —
• �� AFFIRMATIVE ACTION
City of Sunny Isles Beach
OF SUS 18070 Collins Avenue
Sunny Isles Beach,FL 33160
Telephone:(305)947-0606 Fax:(305)949-3113
EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT
The contractors and all subcontractors hereby agree to a commitment to the principles and
practices of equal opportunity in employment and to comply with the letter and spirit of
federal, state, and local laws and regulations prohibiting discrimination based on race,
color, religion, national region, sex, age, handicap, marital status, and political affiliation or
belief.
•
Signed: c6t--
Title: e__en •
//9 Firm: TFg- uiey(sec) G
Address: Ce 0/ COancL r Dr) iP_
® a "7
ZIL nG'jr, ?)c
4of10
�SJN"Y /S(e\ CONFLICT OF INTEREST
-•C +n City of Sunny Isles Beach
' = 18070 Collins Avenue
Sunny Isles each,FL 33160
A „'9 1. r Telephone:(305)947-0606 Fax:(305)949-3113
SF 9)• F.00.\� 54.
C'Ty OF SUN
CONFLICT OF INTEREST STATEMENT
The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers
must disclose with their Bids,the name of any officer,director, partner, associate or agent who is also an officer or
employee of the City of SunnyunIsles Beach or its agencies.
STATE OF FLOI1IRA `��Q�
COUNTY OF lam) I/iaty-svI I
BEFORE ME,the undersigned authority, personally appeared i t I ?-ocCiand
who was duly sworn,deposes,and states:
1. I am the e CU of T IL fn4-erion5es111 ?c with a local
office in and principal office
in PCL t.° 7€1 ?S
2. The abo;`cnamed ntity is ub itting a B' for/the City of Sunny sles Beach, Bid No. i bU-Doi
described as U)SQS�t� , �(iS I (1Y t� 4 T . The Affiant has made diligent
inquiry and provides the information contained in this Affidg4it based upon his own knowledge.
3. The Affiant states that only one submittal for the above Bid is being submitted and that the above
® named entity has no financial interest in other entities submitting Bids for the same project.
4. Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement,
participated in any collusion,or otherwise taken any action in restraints of free competitive pricing in connection
with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the
completion of negotiations if necessary and execution of the Contract for this project.
5. Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or
otherwise ineligible from participation in contract letting by any local,State,or Federal Agency.
6. Neither the entity, nor its affiliates, nor anyone associated with them have any potential conflict
of interest due to any other clients, contracts,or property interests for this project.
7. I certify that no member of the entity's ownership or management is presently applying for any
employee position or actively seeking an elected position with the City of Sunny Isles Beach.
8. I certify that no member of the entity's ownership or management,or staff has a vested interest in any
aspect of the City of Sunny Isles Beach.
9. In the event that a conflict of interest is identified in the provision of services, I,on behalf of the above
named entity,will immediatelyJnotify the City of Sunny Isles Beach.
Dated this Q / day of aq ,20 1C!Q
AFFIANT Print or Type Name and Title
S orn to and subscribed before me this Q day of r^+ _ __ 1 ,20 ie.
® , Personally Known,OR
❑ Produced Identification-Type of Identification b
(� =o`• `" •, TIFFANY WILKES
NOTARY PUBLIC STATE OF FLORIDA ; U2) My Notary ID#123933814 I
,,E a }' txpires January 2!,2022
5 of 10
SUNNY/SI FJ
DISPUTE DISCLOSURE
® „ z
• � �_ City of Sunny Isles Beach
18070 Collins Avenue
0
tie 0.
cDD�•FLOy�� Sunny Isles Beach,FL 33160
of sus '` Telephone:(305)947-0606 Fax:(305)949-3113
DISPUTE DISCLOSURE FORM
Answer the following questions by placing a "X" after "Yes" or "No". If you answer "Yes", please
explain in the space provided, or on a separate sheet attached to this form.
1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the
Department of Professional Regulations or any other regulatory agency or professional associations within the last
five (5) years? �/
YES NO /(.
2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a
contract or job related to the services your firm provides in the regular course of business within the last five (5)
years?
YES NO
3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests,
or litigation in the past five (5) years that is related to the services your firm provides in the regular course of
business?
YES NO � .If yes, state the nature of the request for equitable adjustment, contract
claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the
monetary amounts of extended contract time involved.
I hereby certify that all statements made are true and agree and understand that any misstatement or
misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid
for the City of Sunny Isles Beach.
T-tEnierprises, /nom 5/0$
Firm Date
1ipton F. eoC.danGI CED
Authorized Signature Print or Type Name and Title
6 of 10
,,){4NY/S Fr
0e� ANTI - KICKBACK
_ City of Sunny Isles Beach
• t- 18070 Collins Avenue
3F'D91•F Loas� ', Sunny Isles Beach,FL 33160
c r'or sus Telephone:(305)947-0606 Fax:(305)949-3113
ANTI-KICKBACK AFFIDAVIT
TeX as
STATE OF FL-61:1M )
f :� )
COUNTY OFWI I
I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid
will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a
commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or
by an officer of the corporation.
By:
Title: C
The foregoing ins ent wacknowledge
sir as acknowled • bef•r- me this 401' dayof
9 9, 201 , by IV • L
[name
of ,�,Pa sbn], as - [type of authority], for
�G thfrr e f"IS riG [name of party on behalf of whom instrument was
executed].
AFFIX NOTARY STAMP HERE: •0')J /�
Nota lic.— S •to of-Florida
• TIFFANY WILKES
qI--Fifa f�I �Ifr.s
My Notary ID#123933814 I
Expires January 27,2022 Print or Type Comissioned Name
Personally Known V OR Produced Identification
Type of Identification Produced
S
7 of 10
T.F.R. ENTERPRISES, INC. AND SUBSIDIARIES
LEANDER, TEXAS
CONSOLIDATED FINANCIAL STATEMENTS
AND SUPPLEMENTARY INFORMATION
December 31. 2017,and 2016
CONTENTS PAGE
INDEPENDENT AUDITORS' REPORT
CONSOLIDATED FINANCIAL STATEMENTS
Consolidated Balance Sheets 3
Consolidated Statements of Income
Consolidated Statements of Equity 6
Consolidated Statements of Cash Flows 7
Notes to Consolidated Financial Statements 9
SUPPLEMENTARY INFORMATION
Consolidating Balance Sheet IS
Consolidating Statement of Income 20
VA
Van Houten & Associates, PC
CERTIFIED PUBLIC ACCOUNTANTS
INDEPENDENT AUDITORS' REPORT
•
To the Stockholder
T.F.R. Enterprises, Inc.and subsidiaries
Leander,Texas
We have audited the accompanying consolidated financial statements of T.F.R. Enterprises. Inc. and
subsidiaries which comprise the consolidated balance sheets as of December 31, 2017 and 2016, and the
related consolidated statements of income, equity, and cash flows for the years then ended.and the related
notes to the financial statements.
Management's Responsibility for the Financial Statements
411 Management is responsible for the preparation and fair presentation of these consolidated financial
statements in accordance with accounting principles generally accepted in the United States of America;
this includes the design, implementation, and maintenance of internal control relevant to the preparation
and fair presentation of consolidated financial statements that are free from material misstatement,whether
due to fraud or error. •
Auditor's Responsibility
Our responsibility is to express an opinion on these consolidated financial statements based on our audits.
We conducted our audits in accordance with auditing standards generally accepted in the United States of
America.Those standards require that we plan and perform the audits to obtain reasonable assurance about
whether the consolidated financial statements are free from material misstatement.
An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the
consolidated financial statements.The procedures selected depend on the auditor's judgment,including the
assessment of the risks of material misstatement of the consolidated financial statements, whether due to
fraud or error. In making those risk assessments, the auditor considers internal control relevant to the
entity's preparation and fair presentation of the consolidated financial statements in order to design audit
procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on
the effectiveness of the entity's internal control. Accordingly, we express no such opinion. An audit also
includes evaluating the appropriateness of accounting policies used and the reasonableness of significant
accounting estimates made by management, as well as evaluating the overall presentation of the
consolidated financial statements.
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our
audit opinion.
1517 E. Palm Valley Blvd. • Round Rock, TX 78664 • 512.310.9277 • Fax 512.310.8599
4111
Opinion
In our opinion,the consolidated financial statements referred to above present fairly,in all material respects,
the financial position of T.F.R. Enterprises. Inc. and subsidiaries as of December 31, 2017 and 2016, and
the results of its operations and its cash flows for the years then ended in accordance with accounting
principles generally accepted in the United States of America.
Report on Supplementary Information
Our audits were conducted for the purpose of forming an opinion on the consolidated financial statements
as a whole. The supplemental consolidating information is presented for purposes of additional analysis
and is not a required part of the consolidated financial statements. Such information is the responsibility of
management and was derived from and relates directly to the underlying accounting and other records used
to prepare the consolidated financial statements. The information has been subjected to the auditing
procedures applied in the audit of the consolidated financial statements and certain additional procedures,
including comparing and reconciling such information directly to the underlying accounting and other
records used to prepare the consolidated financial statements or to the consolidated financial statements
themselves, and other additional procedures in accordance with auditing standards generally accepted in
the United States of America. In our opinion, the information is fairly stated in all material respects in
relation to the consolidated financial statements as a whole.
VQv� , `Oc. e� j iS5, P�
Round Rock, Texas
March 21,2018
® T.F.R. ENTERPRISES, INC AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
NOTE A—SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
Operations and Accounting
T.F.R. Enterprises. Inc.and subsidiaries("the Compam") is in the principal business of expedient disaster •
debris management, removal, reduction, recycling, and disposal services throughout the United States.
Customers include federal agencies, municipalities,and private companies.
Basis of Consolidation
The consolidated financial statements include all accounts of T.F.R. Enterprises. Inc. (Enterprises)and its
99% majority owned subsidiaries T.F.R. Equipment; LP ('`Equipment") and T.F.R. Realty, LP("Realty).
The remaining 1%is owned by T&J Management, LLC, which is wholly owned by a trust established for
the benefit of a related party.
Equipment is an operating entity formed to own heavy equipment which is primarily leased to the Company
for use in the performance of its service contracts. Realty is an operating entity formed to own real estate.
All of its income is derived from the Company.
All significant intercompany accounts and transactions have been eliminated in the consolidation.
Cash and Cash Equivalents
For purposes of the statements of cash flows. the Company considers cash and short-term investments with
original maturities of ninety days or less to be cash and cash equivalents.
Accounts Receivable
Accounts receivable are recognized On the basis of amounts billed, less pavmentlreceived. The Company
provides for uncollectable accounts receivable through the allowance method of accounting. Under this
method, a provision for uncollectable accounts is charged to expense and the allowance account increased
based on past collection history and management's evaluation of accounts receivable. All amounts •
considered uncollectable are charged against the allowance account and recoveries of previously charged
off accounts are added to the account.Receivables are considered past due based on how recently payments
have been received.
Management has reserved against the receivables discussed in Note I for the amount of$713,177. Bad debt
expense was SSS7.664 and SO for the year ending December 31, 2017 and 2016.
Property and Equipment
Property and equipment are recorded at cost and are depreciated over their estimated useful lives using the
straight-line method for financial reporting. Maintenance and repairs are charged to expense as incurred.
Major renewals and betterments are capitalized and depreciated over their estimated useful life. When
property and equipment is sold or retired, the related cost and accumulated depreciation are removed from
the accounts and any gain or loss is included in income.
9
•
•
T.F.R. ENTERPRISES,INC.AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
NOTE A—SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES—continued
Property and Equipment—continued
Categories of assets and their useful lives are as follows:
Land Inde finite
Buildings 40 years
Office equipment 5 - 10 years
Leasehold improvements 27 Years
Machinery and equipment 5 - 10 years
Lona-lived assets held and used by the Company are reviewed for impairment whenever events or changes
in circumstances indicate that the carrying amount of an asset may not be recoverable. In the event that
facts and circumstances indicate that the cost of any long-lived assets may be impaired. an evaluation of
recoverability would be performed.
Inventory
Inventory is stated at the lower of cost or net realizable value and is comprised of raw materials and finished
goods, and primarily consists of mulch held for sale and tires used for heavy machinery and equipment.
Cost is determined using the first-in, first-out method(FIFO).
Revenue Recognition
The Company recognizes revenue as it is earned and payment is reasonably assured. Expenses are
recognized as they are incurred.
Use of Estimates
The preparation of financial statements in conformity with generally accepted accounting principles in the
United States of America requires management to make estimates and assumptions that affect the reported
amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial
statements and the reported amounts of revenues and expenses during the reporting period. Actual results
could differ from those estimates.
Reclassifications
Certain reclassifications were made to the 2016 balances to confirm to the 2017 presentation.These
reclassifications did not have a material impact on the consolidated financial statements.
NOTE B—NOTES PAYABLE
Notes payable as of December 31. 2017 and 2016 consist of the following:
2017 2016
Note payable to Volvo Financial Services,clue in monthly
installments of 53,130, including interest at 2.90%,maturing
April 30, 2019 and secured by equipment of the company. 40,945 $ 78.500
40
10
®
T.F.R. ENTERPRISES, IIVC..4NI)S(IBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
NOTE B—NOTES PAYABLE—continued
2017 2016
Note payable to Caterpillar Financial Services,due in monthly
installments of S4,994, including interest at 4.18%,maturing
May 8,2018 and secured by equipment of the company. S 15.033 S 77,813
Note payable to Caterpillar Financial Services,due in monthly
installments of 53,942, including interest at 0.00%,maturing
February 8,2018,and secured by equipment of the company.
Note was paid in full subsequent to year end. 7.536 54.313
Note payable to Frost Bank,due in monthly installments of
S10,429, including interest at 3.34%,maturing
February 18.2019,and secured by equipment of the company. 142.879 261.014
Note payable to Frost Bank,due in monthly installments of
S24.587, including interest at 3.34%,and secured by equipment
of the company. Note was paid in full during the current year. - 48.626
® Note payable to Frost Bank,due in monthly installments of
51.857,including interest at 3.39%,and secured by equipment
of the company. Note was paid in full during the current year - 9.174
•
Note payable to Frost Bank,due in monthly installments of
52,679,including interest at 3.73%,maturing
July 16,2019, and secured by equipment of the company. 4,836 35.926
Note payable to Frost Bank,due in monthly installments of
S2,135. including interest at 3.87%.maturing
September 22. 2018,and secured by equipment of the company. 18,885 43.139
Note payable to Frost Bank.due in monthly installments of
S3,654, including interest at 3.80%,maturing
December 16, 2018,and secured by equipment of the company. 43,132 84.304
Note payable to Frost Bank,due in monthly installments of
51,140, including interest at 3.80%,and secured by equipment
of the company. Note was paid in full during the current year. - 26,300
Note payable to Frost Bank,due in monthly installments of
S3.170, including interest at 3.42%,maturing
January 5, 2018,and secured by equipment of the company.
Note was paid in full subsequent to year end. 3.034 43,411
T.F.R. ENTERPRISES, INC.AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
NOTE B—NOTES PAYABLE—continued
2017 2016
Note payable to Ford Motor Credit,due in monthly installments
of 5910. includin_ interest at 0.00%,and secured by equipment
of the company. Note was paid in full clurin the current year. S - S 7.279
Note payable to Ford Motor Credit,due in monthly installments
of SI,S90, including interest at 0.00%,secured by equipment of
the company. The Note was paid in full during the current year. - 5.670
Note payable to Bank of the West,due in monthly installments
of 510,303, including interest at 4.25%,maturing
October 28. 2019.and secured by equipment of the company. 102,529 378.076
Note payable to Prosperity Bank,due in monthly installments
of S9.750, includine interest at 4.85%. maturing_
September 25.2028,and secured by equipment of the company. 969,589 1.037,109
Note payable to Prosperity Bank,due in monthly installments
of S15,751, including interest at 6.2_5%, maturing
September 15,2033,and secured by equipment of the company. 1,957.910 2.023.055
• Note payable to Prosperity Bank,due in monthly installments
of S11,720.including interest at 4.75%, maturing:
September 23, 2032,and secured by equipment of the company. 1.481.023
4,787.331 4.213,809
Less current maturities (564.691) (929.673)
S 4.222.6 40 S 3.284.136
Aggregate maturities for the years subsequent to December 31, 2017 are as follows:
2018 S 564,691
2019 240.982
3030 230.821
2021 241258
2022 256,378
Thereafter 3.251201
S 4.737.331
12
® T.F.R. ENTERPRISES.INC AND SUBSIDIARIES
® NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
NOTE C—LINE OF CREDIT
The Company had a 52,500.000 line of credit agreement with Frost Bank with a maturity on March I,2017
and interest at lenders prime rate plus 1.25 points.The terms provide for certain mutual covenants between
the Company and Frost Bank. Minimum monthly payments are required in the amounts of all accrued
interest. The line was secured by assets of the Company, stockholder and a related party. As of December •
31. 2016, the Company had fully drawn the line. The line of credit was extended through September 2017
in which time was not renewed and paid in full.
The Company has a S1.000,000 line of credit agreement with Prosperity Bank with a maturity of September
23, 2019 and interest at the greater of 4.75 points prime rate plus .50 points. The terms provide for certain
mutual covenants between the Company and Prosperity Bank. Minimum monthly payments are required in
the amounts of all accrued interest. The line is secured by the assets of the Company. stockholder, and a
related party. As of December 31, 2017, the outstanding balance was SO with 51.000.000 available to
borrow.
NOTE D—INTERCOMPANY TRANSACTIONS
During the year ended December 31, 2017, the Company rented its administrative offices, equipment
storage and maintenance facility from Realty and equipment used in the performance of its contracts from
Equipment. Rents paid during the year to Realty were $318.850. Rents paid during the near to Equipment
were 5448,485. Currently there are no signed leases with either subsidiary.Therefore, no future minimum •
lease payments are required.
® During the year ended December 31, 2017, Realty loaned Enterprises S1,474,866. The loan has no stated
interest nor any repayment terms.
NOTE E—FAIR VALUE MEASUREMENT
The generally accepted framework for measuring fair value provides a hierarchy for measuring both
financial and nonfinancial assets and liabilities. The fair value of an asset is the price at which the asset
could be sold in an orderly transaction between unrelated,knowledgeable,and willing parties able to engage
in the transaction.A liability's fair value is defined as the amount that would be paid to transfer the liability
to a new obligor in a transaction between such parties, not the amount that would be paid to settle the
liability with the creditor.
Level I Quoted prices in active markets for identical assets or liabilities.
Level 2 Quoted prices in active markets for similar assets or liabilities.quoted prices in markets that are not
active,or inputs other than quoted prices that are observable for the asset or liability.
Level 3 Unobservable inputs for the assets or liability that are supported by little or no market activity and
that are significant to the fair value of the assets or liabilities.
The following table sets forth by level,within the fair value hierarchy.the Company's marketable securities
at fair value as of December 31. 2017 and 2016.
Gross Unrealized
Cost Level I Level 2 Level 3 Gain(Loss)
Investment in gold coins S 244,184 S - S - S 244,184 S (1.051,658)
13
T.F.R. ENTERPRISES, INC.AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
NOTE E—FAIR VALUE MEASUREMENT—continued
The level 3 investments are valued at the historical average sales price for individual coins.The valuation
for unrealized gain or loss is presented on the balance sheet as accumulated other comprehensive income.
The reconciliation of accumulated other comprehensive income for the years ended December 3I, 2017
and 2016 are as follows:
Accumulated
• Other
Comprehensive
(Loss)
Balance at January I,2016 $ (2,830,950)
Reclassification from realized losses from:
Sale of gold coins,net of tax 290,311
Theft of Hold coins,net of tax 1.488.981
Balance at December 31,2016 S (1,051.658)
Balance at December 31.2017 $ (1,051.658)
NOTE F—LOSS FROM THEFT
During the year ended December 31, 2016, the Company suffered losses due to theft of gold coins. The
cost basis of the coins was S1,747,950.This amount has been recognized as a current period loss during the
year ended December 31. 2016 on the Consolidated Statements of Income.
NOTE C—INCOME TAXES
The Company is taxed as a C-Corporation and accounts for income taxes whereby deferred taxes are
provided on temporary differences arising from assets and liabilities whose basis are different for financial
reporting and income tax purposes. •
Deferred taxes result primarily from timing differences in the recognition of net operating losses,allowance
for doubtful accounts, and depreciation expenses for tax and financial reporting and from reporting for
federal income tax purposes on the accrual basis method of accounting. Depreciation expense for financial
reporting is computed using the straight-line method, however, for tax purposes. the modified accelerated
cost recovery system (MIACRS)is followed.
14
® T.F.R. ENTERPRISES,INC AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
NOTE G—INCOME TAXES—continued
The components of current and deferred income tax expense at December 3 I.2017 and 2016 are as follows:
2017 2016
Provision(benefit) for current period:
State income taxes $ 235,269 S 9.835
Federal income taxes 958.893 -
Deferred tax expense (benefit)related to:
Federal income tax net operating loss carryforward 1,100,934 845.909
Allowance for doubtful accounts (149,330)
Depreciation 681.073 231,800
1,632,177 1,080.709
Total expense S 2.826.339 S 1,090.544
The Company's total deferred tax assets and deferred tax liabilities are as follows:
2017 2016
Deferred tax asset - Federal income tax net
operating loss carryforward,allowance for doubtful accounts S 149,830 S 1,100.934
Deferred tax asset(liability)-depreciation S (468.799) S 212,274
Management has determined there are no uncertain tax positions as of December 31. 2017 and 2016.
Accordingly.there is no interest or penalties related to uncertain tax positions. If interest or penalties were
to be incurred related to uncertain tax positions. such amounts would be recognized in general and
administrative expense.
State and local income taxes are calculated based on the state tax code where revenues are earned and
expenses are incurred.
•
NOTE H —CONCENTRATIONS OF CREDIT RISK
For the year ended December 31. 2017, two government agencies comprised forty four percent of total
revenues. As of December 31. 2017. two government agencies comprised eighty seven percent of total
accounts receivable
•
For the year ended December 31. 2016. two uovernment agencies comprised sixty seven percent of total
revenues. As of December 31, 2016, one government agency comprised seventy eight percent of total
accounts receivable.
At various times throughout the years ended December 31, 2017 and 2016, the Company had deposits in
excess of the FDIC limits.Management considers this risk to be mitigated by maintaining deposits at quality
financial institutions.
I5
® T.F.R. ENTERPRISES, INC.AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
NOTE I —CONTINGENT LIABILITY
As of December 31. 2017, one governmental agency under two contracts have an accounts receivable
balance of$5,326.616. Of this balance. management reasonably believes 51,959,260 will be collected
within the year. It is the belief of the Company's management and legal representation that the remaining
balance is reasonably likely to be collected in a time frame greater than one year,and has chosen to reserve
twenty percent of the remaining balance.
One subcontractor to the Company has an accounts payable balance of S2.261,125 under a contract with a
"pay if paid" provision. The subcontractor has informally agreed to await collection efforts and has
executed a tolling agreement with the Company's surety to preserve their bond rights and forbear from
filing suit. It is the beliefof the Company's management and legal representation that the remaining balance
is reasonably likely to be paid in a time frame greater than one year.
NOTE.1—NEWW'ACCOUNTING PRONOUNCEMENTS
The Financial Accounting Standards Board ("FASB") issued Accounting Standards Update No. 2015-17,
Income Tares (Topic 7.10,: Balance Sheet Classification of Deferred Taves: This update would require an
entity to present deferred income tax assets or liabilities as a net long-terns asset or net long-term liability.
The previous presentation required a net presentation of current deferred tax assets or liabilities and non-
current deferred tax assets or liabilities. The effective date for transition for entities other than public
business entities is for annual periods beginning after December 15, 2017 with early adoption permitted.
Management of the Company has chosen to early adopt this change in presentation. Due to this change.as
of December 31. 2016 current assets decreased and non-current assets increased by S1,100.934.
® NOTE ti—SUBSEQUENT EVENTS
Management has performed a subsequent events review through March 2 1. 2018. which is the date the
financial statements were issued. Management concluded that there were no material subsequent events
which required additional disclosure in these financial statements.
16
4i
SUPPLEMENTARY INFORMATION
S T.F.R. ENTERPRISES, INC.AND SUBSIDIARIES
CONSOLIDATING BALANCE SHEET
•
December 31,2017
F.F.R. T.F.R. T.F.R.
Enterprises.Iii . Equipment,IP Realty,IP Eliminations Consolidated
AS SCES
cumw_vr Ass Ers
Cash , S 5,523,743 S 4,318 S 6.793 S • $ 5.540,359
Investment 144.184 - -- 244.184
Accounts'reeeivable-trade 15,854.928 - - - 15,354.913
-
Accounts receivable•retainaw 14,255 - - 14.255
Accounts Neck able-intercompam 83,450 49.043 - (137.493)
Ins entor 264.319 - - 164.319
ToTA I.CURRENT ASSETS 21.994,379 53.3ish 6.793 1137.498/ 11.918,045
PRO PERTV ANI)EQ1:11'31E:NT
Land - - 7.139,325 - 7,139,325
Buildings - - 637.126 - 637,226
Officem
equipe - -nt t.-.1.932 - 61.932
Leasehold improvements 305.853 - - 305.353
NI:whiner).and equipment 3,60339 3,444.933 - - 12,114.237
4.037,174 3.444,948 7.776.551 20,258,673
Less aCCUmulat ed depreciation (2.861.833) (6.113,766) (133,0)7) - (9.173.666)
1.175.291 2.311.132 7.538.534 - 11,035.007
ftwit ER ASSETS
Acounts receivable-trade-lents tenn.net '.353.90 -9 - - 1-353.909
Note receivable-intercompany - - 1,474,366 (1,474.8661 -
Loan cost net of amortization 5,143 - . 5,143
Investments in subsidiaries 1.904.102 - - (2.904 )02)
roTAL.ASSETS S 28,918.181 S 2.375.048 S 9.075.341 5 (4,516,466t S 35.862.104
0
18
S T.F.R. ENTERPRISES, INC AND SUBSIDIARIES
CONSOLIDATING BALANCE SHEET—continued
December 31,2017
T.F.R. T.F.R. T.F.R.
Enterprises.Inc. Equipment,IP Realty.IP Eliminations Consolidated
LIABusr Irs AND EQ urry
CURRENT uum_mrs
Accounts payable•trade S 7.655,076 5 - S - 5 - S 7.655.01'6
Accounts payable•retainace 1,004,827 - - - 1.004,827
Accounts payable-intercompany 49.048 85.450 - (137.493; -
Federal income taxes payable 958,893 - - - 955.893
State income taxes payable 235.269 • - - 235.269
Accrued expenses 6.33,023 - 448 - 633,471
Due to stockholder 662,641 • - - 662.611
Intercompany pit able I.474,866 • • (1.474,866) -
Notes payable-current',oni)n 59.250 297.56-1 207.347 - 564.691
ToTAI.CURRENT LIABILITIES 12,762,92.3 386.014 208,293 (1.612,3643 11,744.863
LONG-TE1011JAIIILITIEs
Deferred income tax liability 318,969 - • - 318,969
•
Accounts payable-trade•lung term 2,161,125 - - - 2,161,125
Notes payable 4.234 17,731 4.200.675 - 4222.640
EQUITY
0 Common stock
Retained earnings 500
- - - 500
14.732,083
-
- (2,904.192) 11227,986 •
Partnership equity - 1,971,103 4.666.371 166.3771 6.571.297
Accumulated other comprehensive;loss j ;1,051,658i - - - 31.051.638)
Noncontrolline interest - - 66.377 66.377
13.680.930 1.971.303 4.666,371 32,904,1021 17,414.502
TOTAL LIABILITIES
AND EQUITY S 28,928.181 5 2.375.045 S 9.075.341 S 14,516.4661 S 35,862,104
...
0
19
S T.F.R. ENTERPRISES,INC AND SUBSIDIARIES
CONSOLIDATING STATEMENTS OF INCOME
For the year ended December 31,2017
T.F.It T.F.H. T.F.R.
Enterprises.Inc Equipment.EP Realty,IP Eliminations Consolidated
INCOME
Service cunt racts S 31,162,962 S - S - S - S 31.162.962
Rental income 448,485 318,350 067,3351
TOTAL REVENUES 31.162.962 448.485 313,850 4767.3351 31,162.962
COSTS OF REVENUES
Cost of,:ont rut s 19.645,285 - 048,4851 19,196,800
Cost of rentals - 445,136 15,985 461.171
TOTAL COSTS OF REVENUES 19,645,235 445.186 15.985 (448,485) 19,657,971
GROSS NI ARGIN 1(.517.677 3.194 302.865 1318.850) 11.504.991
0 vut•vriNt;LxrcoNs ES
General and administrative 4.188.593 1.321 1,133 (318.850) 3.872.197
INCOME FROM OPERATIONS 7.329,084 1,973 301.732 - 7,632,794
OTIIER INCOME(EXPENS El
Interest expense (I(9,3 76) (1 3,3 10) (1 96.S 391 - (329,525)
SI iscellaneous income 25,525 11,241 - 36.766
Gain on insurance proceeds 65.477 - 65.477
0 NI iscellaneous expense 08.234)
4112.0851 52,167 -
4185,5981 -
• (18,234)
(245.516)
INCOME(LOSS 1 BEFORETAXES 7.216.999 54,145 116.134 - 7.387,278
PRO VIS ION FOR LNCOME TAXES
Federal 958,893 - - - 958.893
Federal deferred expense 1.632.177 - - 1,632.177
State 235.269 - - - 235.269 _
2.826.339 - • - 2.826.339
NET INCOME(LOSS) 4.390,660 54,145 116.134 - 4,560.939
Net income attributable to
noneontrolling interest • - - 1.703 1.703
NET 1NCONIE(LOSS)ATI-RIM:FABLE TO
coN-rnoLIING INTEREST S 4.390.660 S 54.145 S 116,134 5 1 1,703 1 5 1.5 5 9.2 36
0 .
20
•
•
SVNNY `P7v
BID BOND
City of Sunny Isles Beach
•- 18070 Collins Avenue
of D'•F1.01° ' Sunny Isles Beach,FL 33160
rr o:suM�� Telephone:(305)947-0808 Fax:(305)949-3113
STATE OF FLORIDA
COUNTY OF Miami-Dade)
KNOW ALL MEN BY THESE PRESENTS, that we,TFR Enterprises, Inc. as Principal, and
Westchester Fire Insurance ompany as Surety, are held and firmly bound unto the City of Sunny Isles
Beach, a municipal corporation of the State of Florida in the sum of Five Thousand and no/100ths Dollars ($ 5,000.00 ), lawful
money of the United States,for the payment of which sum well and truly to be made,we bind ourselves,our heirs, executors, administrators
and successors jointly and severally,firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the accompanying Bid
dated, May 10, 2018 for.
Disaster Debris Management and Disposal Services,RFP#: 18-04-02
WHEREAS,it was a condition precedent to the submission of said Bid that a cashier's check or Bid Bond in the amount of five percent(5%)of
the Base Bid be submitted with said Bid as a guarantee that the Proposers would, if awarded the Contract, enter into a written Contract with
the City for the performance of said Contract,within ten(10)consecutive calendar days after written notice having been given of the Award of
the Contract.
NOW, THEREFORE, the conditions of this obligation are such that if the Principal within ten (10) consecutive calendar days after written
notice of such acceptance,enters into a written Contract with the City of Sunny Isles Beach and furnishes the Performance Bond,satisfactory
-to the City,each In an amount equal to one hundred percent(100%)of the Contract Price,and provides all required Certificates of Insurance,
then this obligation shall be void; otherwise the sum herein stated shall be due and payable to the City of Sunny Isles Beach and the Surety
herein agrees to pay said sum Immediately, upon demand of the City,in good and lawful money of the United States of America,as liquidated
damages for failure thereof of said Principal.
IN WITNESS WHEREOF, the above bonded parties have executed this instrument under their several seals this 10th day
of May ,2018 , the name and the corporate seal of each corporate party being hereto affixed and these presents
being duly signed by its undersigned representative.
DOCUMENT CONTINUES ON NEXT PAGE
_ _ r
IN PRESENCE OF: ��-
TFR Enterprises, Inc. —
Individual or Partnership Principal Affix Corporate Seal -
601 Leander Drivezr-
Business Address _
Leander, TX 78641
City,State,and Zip Code
512-260-3322 N/A
Business Telephone Business Facsimile
Westchester Fire Insurance Company
. wtek. Via ' Secretary
/l/C (Corporate_Sure Sharon Grant-Witness
By: rl/
Brock Baldwin -Attorney in Fact
`Impress Corporate Seal
IMPORTANT
Surety companies executing bonds must appear on the Treasury Department's most current list(circular 570 as amended)and be authorized
to transact business In the State of Florida.
8 of 10