Loading...
HomeMy WebLinkAboutReso 2018-2839 RESOLUTION NO. 2018 - • A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE ORDER NO. 4 TO AGREEMENT #3 WITH EBSARY FOUNDATION CO. FOR THE THIRD PHASE OF THE CONSTRUCTION OF THE NORTH BAY ROAD PEDESTRIAN EMERGENCY BRIDGE, IN AN AMOUNT NOT TO EXCEED ONE HUNDRED SEVENTY-TWO THOUSAND NINE HUNDRED FIVE DOLLARS AND NINETY CENTS ($172,905.90), ATTACHED HERETO, IN SUBSTANTIALLY THE SAME FORM, AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER AND CITY ATTORNEY TO DO ALL THINGS NECESSARY TO EFFECTUATE THE TERMS OF THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on February 16, 2017, via Resolution No. 2017-2663, the City Commission approved Agreement 111 with Ebsary Foundation Co. for the North Bay Road Pedestrian Emergency Bridge for the North Bay Road Pedestrian Emergency Bridge, consisting of mobilization, MOT, demolition, drilled shafts, cast in place concrete, precast concrete structure, administration, contingency, and associated fees in an amount not to exceed $3,407,032.45; and WHEREAS, on February 16, 2017, via Resolution No. 2017-2664, the City Commission approved Agreement #2 with Ebsary Foundation Co. for the North Bay Road Pedestrian Emergency Bridge for the North Bay Road Pedestrian Emergency Bridge, consisting of bridge approaches, MSE walls, road bed support, administration, contingency and associated fees in an amount not to exceed $1,796,673.45; and WHEREAS, on February 16, 2017, via Resolution No. 2017-2665, the City Commission approved Agreement #3 with Ebsary Foundation Co. for the North Bay Road Pedestrian Emergency Bridge for the North Bay Road Pedestrian Emergency Bridge, consisting of finish grade, road bed, asphalt, pavers, decorative fencing, hardscape, permanent safety elements, electrical system, administration, contingency and associated fees in a total amount not to exceed $823,010.95; and WHEREAS, on November 16, 2017 via Resolution No. 2017-2757 the City Commission approved Change Order Nos. 1 and 2 to include bridge decorative colored surface material, landscape planters, wooden benches, and associated rigid pavement slabs required to provide a pedestrian friendly atmosphere, the addition of storm water drainage for the bridge, and improved storm water drainage and pavement for the roadway abutting the emergency/pedestrian bridge in a total amount not to exceed $616,379.48; and WHEREAS, on April 19, 2018 via Resolution No. 2018-2811 the City Commission approved Change Order No. 3 to include milling and resurfacing of the asphalt drive at the Salem House Condominium, complete with new storm sewer access and vehicle parking bumpers,and additional Paveway Systems Coating surface at North bridge approach, installation of additional fencing, Page I of 3 82018 Ebsary Agmt No 3 CO 4 gates, guardrail along and adjacent to bridge, furnishing and installing new canal navigational markers, and installing new roadway delineators at the 174 Street intersection, in a total amount not to exceed $223,655.65; and WHEREAS,Ebsary Foundation Co. has submitted Change Order No. 4 to include required services and support for the offsite Mangrove mitigation required by the SFWMD as a condition for the permit to construct the bridge, along with miscellaneous work for bridge drainage grates, and aluminum fencing; and WHEREAS, staff has determined that additional services beyond the original scope of work is needed to complete the project; and WHEREAS,the City wishes to approve Change Order No. 4 to Agreement#3 with Ebsary Foundation Co. for the North Bay Road Pedestrian Emergency Bridge for the North Bay Road Pedestrian Emergency Bridge, in a total amount not to exceed One Hundred Seventy-Two Thousand Nine Hundred Five Dollars and Ninety Cents ($172,905.90), attached hereto, in substantially the same form, as Exhibit "A", bringing the total amount of Agreement #3 not to exceed One Million Eight Hundred Thirty-Five Thousand Nine Hundred Fifty-One Dollars and Ninety-Eight Cents ($1,835,951.98). NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approving Change Order No. 4 to Agreement #3 with Ebsary Foundation Co. The City Commission hereby approves Change Order No. 4 to Agreement #3 with Ebsary Foundation Co. for the North Bay Road Pedestrian Emergency Bridge for the North Bay Road Pedestrian Emergency Bridge, in a total amount not to exceed One Hundred Seventy-Two Thousand Nine Hundred Five Dollars and Ninety Cents ($172,905.90), attached hereto, in substantially the same form, as Exhibit "A", bringing the total amount of Agreement #3 not to exceed One Million Eight Hundred Thirty-Five Thousand Nine Hundred Fifty-One Dollars and Ninety-Eight Cents ($1,835,951.98). Section 2. Authorization of City Manager and City Attorney. The City Manager and City Attorney are authorized to do all things necessary to effectuate the terms of this Resolution. Section 3. Effective Date. This Resolution shall become effective upon adoption. PASSED and ADOPTED this 21st day of June 018. Geo _e H. Scholl, Mayor Page 2 of 3 R2018 Ebsary Agmt No 3 CO 4 •ATTEST: •. Mauricio Betan ur:.CM , City Clerk `ate_ APPROVED AS TO FORM AND LEGAL-S t FFICIENCY: Hans • in. 1f' Attorney Moved by: ( IMISSt (3 It SVt640n1 Seconded by: litcxOf,Hog_ Go f d • Vote: / Mayor Scholl J (Yes) (No) Vice Mayor Goldman (Yes) (No) Commissioner Aelion , (Yes) (No) Commissioner Gatto / (Yes) (No) Commissioner Svechin V (Yes) (No) Page 3 of 3 R2018 Ebsary Agmt No 3 CO 4 SUNY 440. ti . CITY OF CHANGE SUNNY ISLES BEACH .D -�, O ORDER ' * FLOP, Ci?)' OF SUN P14O CHANGE ORDER NUMBER: 4 DATE: June 14 ,2018 PROJECT: RFP NUMBER: 14-09-01 North Bay Road Pedestrian Emergency RESOLUTION NUMBER: Bridge CONTRACT 3 ORIGINAL DOLLAR CONTRACT AMOUNT: $ 823,010.95 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: $ 840,035.13 DOLLAR AMOUNT OF THIS CHANGE ORDER: $ 172,905.90 CREDIT/DIRECT PURCHASES: $ 0 NEW DOLLAR CONTRACT AMOUNT: $ 1,835,951.98 ORIGINAL CONTRACT COMPLETION DATE February 15,2018 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 0 - Zero AMOUNT OF DAYS PER THIS CHANGE ORDER: 0 - Zero NEW CONTRACT COMPLETION DATE: February 15,2018 DESCRIPTION OF SCOPE OR WORK CHANGES: Provide all required services and support for the offsite Mangrove mitigation required by the SFWMD as a condition for the permit to construct the bridge, along with miscellaneous work for bridge drainage grates, and aluminum fencing. NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant ahy additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, Including all direct and indirect costs for equipment, manpower, materials, overhead, profit and delay relating to the Issues set forth In this document. CONTRACTOR Ebsa Foundation Co. CITY ATTORNEY: Hans Ottinot O 0 44 ?7?T fiPROJECT MANAGER: Paul T. Abbott I f CITY MANAGER: Christopher Russo •