HomeMy WebLinkAboutCraven Thompson & Assoc.PREPARED FOR REQUEST FOR QUALIFICATIONS • RFQ NO. 18-08-01
C
T
A
Craven Thompson
& Associates, Inc.
Project Management
Engineering
Landscape Architecture
Surveying & Planning
3563 NW 53rd Street, Fort Lauderdale, FL 33309Phone: (954) 739-6400
SEPTEMBER 4TH, 2018
CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUND AND ROADWAY IMPROVEMENTS (CCNA)
PDF FORMAT
S
e
c
t
i
o
n
A
T
i
t
l
e
P
a
g
e
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION A - TITLE PAGE
Consulting Engineering Services
for
Golden Shores Utility Undergrounding and
Roadway Improvements (CCNA)
Request for Qualifications No. 18-08-01
Submitted to:
City of Sunny Isles Beach
Office of the City Clerk
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
Submitted by:
Craven Thompson & Associates, Inc.
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
c/o Tim Hall, P.E., (954) 739-6400
September 4, 2018
A | Page 1
S
e
c
t
i
o
n
B
T
a
b
l
e
o
f
C
o
n
t
e
n
t
s
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION B – TABLE OF CONTENTS
PAGE NO.
SECTION A - TITLE PAGE
▪ Title Page ................................................................................................................................... A-1
SECTION B - TABLE OF CONTENTS
▪ Table of Contents ..................................................................................................................... B-1
SECTION C - COVER LETTER AND EXECUTIVE SUMMARY
▪ Cover Letter and Executive Summary .....................................................................................C-1
SECTION D - PROJECT APPROACH AND UNDERSTANDING
▪ Project Approach and Understanding..................................................................................... D-1
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
▪ Qualification Information .......................................................................................................... E-1
▪ Standard Form 330 ............................................................................................................... E-14
o Project Organizational Chart ........................................................................................... E-15
▪ Professional Licenses and Corporate Charter ..................................................................... E-49
SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED
▪ Company Overview .................................................................................................................. F-1
▪ References ................................................................................................................................ F-2
▪ Organizational Chart ................................................................................................................. F-8
▪ Professional Resumes .............................................................................................................. F-9
SECTION G - CORPORATE STANDING AND AUTHORIZED SIGNATORY
▪ State of Florida Certificate of Good Standing ........................................................................ G-1
▪ Sunbiz Document Listing Officers ........................................................................................... G-2
SECTION H - VARIATIONS / EXCEPTIONS
▪ Variations / Exceptions ........................................................................................................... H-1
SECTION I - LITIGATION STATEMENT
▪ Litigation Statement .................................................................................................................. I-1
SECTION J - FORMS AND ATTACHMENTS
▪ Required Forms ........................................................................................................................ J-1
▪ Project Verification Form .......................................................................................................... J-2
o Project Summaries ........................................................................................................... J-3
▪ Section 6 Respondent Submittal Forms ................................................................................. J-6
▪ Acknowledgement of Addenda ................................................................................................ J-7
▪ Respondent Submittal Form .................................................................................................... J-8
▪ Non-Collusion Affidavit ........................................................................................................... J-10
▪ Public Entity Crimes ................................................................................................................ J-11
▪ Equal Opportunity / Affirmative Action Statement ............................................................... J-13
▪ Conflict of Interest Statement ................................................................................................ J-14
▪ Dispute Disclosure Form ........................................................................................................ J-15
▪ Anti-Kickback Affidavit ............................................................................................................ J-16
▪ Contractor Anti-Boycott Certification ..................................................................................... J-17
▪ Proof of Current Certificate of Insurance .............................................................................. J-18
B | Page 1
S
e
c
t
i
o
n
C
C
o
v
e
r
L
e
t
t
e
r
a
n
d
E
x
e
c
u
t
i
v
e
S
u
m
m
a
r
y
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION C - COVER LETTER AND EXECUTIVE SUMMARY
September 4, 2018
Office of the City Clerk
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
RE: CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY
UNDERGROUNDING AND ROADWAY IMPROVEMENTS
REQUEST FOR QUALIFICATIONS NO. 18-08-01
Dear Selection Committee Members:
In response to the City of Sunny Isles Beach’s request for qualifications seeking a qualified
consulting firm for services identified in the RFQ titled, “Consulting Engineering Services for
Golden Shores Utility Undergrounding and Roadway Improvements”, Craven Thompson and
Associates, Inc. (CTA) is pleased to submit this Statement of Qualifications for your
consideration.
This project requires a clear understanding of the process for undergrounding of overhead
utilities and familiarity with the nuances of neighborhood improvement projects. The project
will be done in two phases, the first being installation of conduit and equipment pads, the
second, conversion of services. Installation starts with creating a base file that clearly
identifies existing services and features of the neighborhood. It will include overhead and
surface mounted equipment, storm sewer, sanitary sewer, domestic watermains, natural
gas lines, electrical distribution lines, communication lines, cable lines, street lighting,
landscape, property lines, and easements. In addition, because properties are currently fed
from the rear yard, modified to feed from the front, the siting of transformers will need to
consider the routing of individual services across private properties back to existing meters.
Once collected, the information will be used to interface with the various utility providers.
Designs and criteria will be solicited from each utility. Once provided, the designs from each
individual utility will be overlaid and coordinated into a single conduit and equipment plan
meeting the needs of all utilities.
Along with the underground conversion, we will address street lighting, stormwater
improvements, and restoration of landscape and improvements impacted by
undergrounding efforts, both within public right-of-way and on private properties. Existing
rear yard water services and front yard sanitary laterals will be considered in proposed
design but will remain as currently located.
Services provided include: program planning and management; liaison services with
neighborhood residences, elected officials, and staff; easement preparation; coordination of
electrical, CATV, and telecommunications designs by others; bid document preparation; the
evaluation of the contractor; construction administration services; review of project as-builts
and certification; supplemental engineering services; surveying; lighting: landscape: and
C | Page 1
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION C - COVER LETTER AND EXECUTIVE SUMMARY
stormwater design. In addition, we will be responsible for seeking approvals and permits
from all agencies having jurisdiction. CTA will commit the personnel and resources
necessary to perform these services on time and within budget.
Authorized Agent of Firm
Patrick J. Gibney, P.E.
Vice President, Engineering
Craven Thompson & Associates, Inc.
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
Phone: (954) 739-6400
Email: pgibney@craventhompson.com
Proposed Project Manager:
Tim J. Hall, P.E.
Senior Supervising Engineer
Craven Thompson & Associates, Inc.
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
Phone: (954) 739-6400
Email: thall@craventhompson.com
Our project manager for this program will be Tim Hall, P.E. In addition to his 30 years of
general experience (25 in South Florida) he has specific knowledge and experience with
the undergrounding efforts throughout the City of Sunny Isles Beach. In addition to
orchestrating the ongoing undergrounding efforts along Collins Avenue, he has been
instrumental in coordinating undergrounding efforts for four separate single-family home
communities in Fort Lauderdale, and commercial applications for the Seminole Tribe of
Florida. Motivated by a good challenge, Mr. Hall is very comfortable with running large-scale
projects and is well acquainted with the specific requirements and nuances of
undergrounding projects.
CTA has designed over six thousand (6,000) acres of neighborhood revitalization projects,
primarily for utility relocation and stormwater improvements, but including related aspects
such as roadway design, right-of-way restoration, traffic calming, linear parks and
monuments, driveway harmonization, swale regrading sidewalk installation, ADA
improvements, and landscaping, irrigation, and hardscape. We have taken these projects
from the planning stages, through design, permitting and bidding, through construction
management and certification.
We have extensive experience, knowledge and insight into the public
outreach/community relations aspects of these types of projects as we provided these
services on all of our neighborhood revitalization projects.
CTA is currently under contract for a number of projects with multiple clients. In 2017, CTA
was at a company-wide utilization rate of 66%. The business plan target composite
utilization rate for the company was 75%. The targeted rate accounts for holiday, vacation,
marketing, administration, illness, and other non-billable time. CTA employs a very small yet
efficient number of administration personnel which contributes significantly to reducing our
costs. Our projected workload will ramp-up slightly above the current level for the next six to
twelve months but we anticipate a company-wide utilization of approximately 70% to
continue beyond that as work shifts between survey, design, and construction phase
services. Based on our current and projected workload, the City of Sunny Isles Beach can be
C | Page 2
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION C - COVER LETTER AND EXECUTIVE SUMMARY
assured that CTA will provide the staff and resources required to provide the necessary
services on time and within the budget.
The staff listed in this proposal was chosen based on their availability to be able to move
forward immediately for this project.
We sincerely appreciate the opportunity of providing this response to the City of Sunny Isles
Beach and hope to have the opportunity to demonstrate our skills to you.
Sincerely,
CRAVEN THOMPSON & ASSOCIATES, INC.
PATRICK J. GIBNEY, P.E.
Vice President, Engineering
PJG/tg
C | Page 3
S
e
c
t
i
o
n
D
P
r
o
j
e
c
t
A
p
p
r
o
a
c
h
a
n
d
U
n
d
e
r
s
t
a
n
d
i
n
g
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION D - PROJECT APPROACH AND UNDERSTANDING
PROJECT APPROACH AND UNDERSTANDING OF UNDERGROUNDING
Introduction
Undergrounding projects, by their nature, have
unique characteristics that make them unlike
other infrastructure projects. For a successful
project, it is crucial to understand the process and
what’s needed to implement. They involve
integration of separate designs from multiple
entities, each with their own concerns and criteria,
into a cohesive plan that serves the community
with minimal disruption. Many undergrounding
projects never get off the ground due to funding.
Even when funded by special assessment, public
money is generally required to advance design to the point where the assessment
methodology and assessment role can be compiled. The Utility providers have little
incentive for undergrounding. From their perspective, undergrounding projects represent
the replacement of perfectly good systems funded by them, with alternative systems funded
by others. Although, the utilities benefit by way of reduced maintenance and storm-repair
costs, the savings typically don’t justify the cost of rebuilding distribution systems. As a
result, the customer assumes the cost rather than the utility providers.
Other issues such as replacing lighting (most lighting is mounted on power poles),
acquisition of easements, potential relocation of existing utilities, restoration of
hardscape/landscape, and potential impact to private services drive costs up. At the same
time, this presents opportunities for right-of-way improvements and potential upgrades for
the utility providers.
Although, the overhead poles are typically owned by FPL through pole agreements, other
franchise utilities use them as well. Although, the primary focus is on FPL, undergrounding
involves outreach to each utility followed by design and coordination of individual
requirements into a cohesive underground distribution plan.
Project Definition
After confirming the limits of the project, the stakeholders and roles will be defined. An
immediate assessment of existing conditions and available data will be initiated in
conjunction with meetings with the City, FPL and the various utilities. Other projects
(anticipated or on-going) will be identified so as not to conflict and/or cause extended
disruption to residents. Phasing will be determined to coincide with funding sources,
sequencing, and availability of design. Agreements for design services with each franchise
utility will be executed. Utilities will be solicited, as-builts collected, and survey of right-of-
way and properties performed. Based upon the parameters identified, a schedule will be
prepared and budgets refined. Program needs for public involvement and coordination with
utilities will be clarified.
D | Page 1
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION D - PROJECT APPROACH AND UNDERSTANDING
With any undergrounding project, decisions need to be made up-front to define the extent of
the project. One such decision is how to account for private services (from transformer to
meter). These may involve a simple reconnection of an existing underground service, others
will require undergrounding of existing overhead services across private properties. With
this project, the majority of services are in the rear yards. This poses accessibility and
restoration issues, but also introduces potentially more complex reconnections;
transformers in the front yard and meters likely in the back.
Not only do these need to be identified for budget purposes, being that improvements will
be made on private property, legal and programmatic logistics need to be understood.
Another initial decision will be whether to allow for pad mounted equipment and switchgear
within the right-of-way. In doing so, the burden to obtain easements on private properties
can be minimized. Conflicts with other projects need to be considered. Consideration for
other improvements such as utility replacement, right-of-way restoration, pedestrian-ways,
drainage or landscape improvements could directly impact the project. Parameters of
“other” projects must be vetted with impacts to timing, budget, and phasing considered.
Design
Once base information has been collected and parameters defined, design efforts can
begin. Most of the efforts will be coordinating the independent designs of the franchise
utilities. Starting with FPL, the needs of each utility will be considered and ultimately
consolidated into a single set of construction documents. Separate phasing, back-feeding,
easements, above grade equipment, overhead services, feeders, and potential
pedestrian/vehicular conflicts will be considered as well as constructability and disrupt ion to
residents.
Location of proposed equipment and existing services will be roughed-out, with the intent of
minimizing easement acquisitions. Lighting needs will be considered where removal of
existing FPL poles results in elimination of existing lighting. Other improvements such as
landscape, drainage, resurfacing, or potential redevelopment will be incorporated into
designs. Agencies with jurisdictional permit review will be contacted and requirements
confirmed. Budgets will be refined to reflect additional information and refinement of plans.
Assuming private service connections are included as part of the project rather than an
obligation of the homeowner, they will be factored into the design and bid documents.
Construction documents need to be comprehensive with flexibility to account for unique
restoration requirements on private properties. In the case where equipment is required,
D | Page 2
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION D - PROJECT APPROACH AND UNDERSTANDING
easement locations within private properties can be controversial. In consolidating designs,
we look to coordinate the needs of individual utilities while minimizing size and locations of
easements on private properties. Interaction with residents will be crucial. Public
involvement combined with a clear course of action and concise answers will be necessary
to gain buy-in and commitment.
Bid and Award
As design is completed, permits issued, and easements acquired, construction documents
and specifications will be compiled into the Bid Package. The Bid Package will include final
utility design and specific requirements of franchise utilities, including requirements for work
be performed by an approved FPL contractor. Upon receipt, bids will be evaluated with
recommendation for award.
Construction will consist of installing empty conduits, manholes, pull-boxes, and equipment
pads. Pulling services is viewed as a separate task by FPL and can either be incorporated
into the bid or left with FPL and other franchise utilities. Further discussion and coordination
with utilities is required to determine a preferred alternative. Once the underground system
is energized, conversion and removal of exiting overheads will be performed by each of the
utilities. As with any project, a complete bid package is essential to ensure project is done
within budget constraints. This is especially true for projects done through special
assessment.
Construction
Aside from providing periodic inspection
services, because of the level of interaction
with the community, the construction
representative will serve as liaison to the
public; readily accessible and answerable
to concerns. It is important to certify
compliance with plans and specifications,
especially if done as a special assessment
but also for permitting agencies.
Construction services will be more involved than with a typical infrastructure project and will
require closer coordination and administration of construction activities. Construction will
need to be monitored and coordinated so as to minimize disruption to residents. Clear and
consistent Public notice and a means to receive residents’ concerns will be necessary
throughout the construction phase.
Conversion
After underground is in place (lines pulled and equipment energized) the conversion of
overhead services can begin. Similar to construction, this will have its own set of unique
challenges and require a well-coordinated effort among the various utility providers with.
Because FPL tariffs tie credit for fee reductions to full conversion, conversions must take
D | Page 3
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION D - PROJECT APPROACH AND UNDERSTANDING
place in a timely manner. Assuming private services (from transformers to customer’s
meter) are included within the undergrounding project, overhead meter cans need to be
replaced to accommodate underground feeds. In replacing meters, code may require that
deficient panels within individual homes be upgraded resulting in an additional expense to
private properties.
Conversion in and of itself will have logistical issues.
Switch over of services needs to be coordinated for
each of the utility providers. Conversion of multifamily
and commercial services are more complex than single
residences. Until all existing overhead utilities have
been removed, the existing poles must remain.
Because the utilities are not set-up for replacing entire
infrastructures, without an agreement committing
proper resources to conversion, the poles could remain
for a prolonged period of time. Careful planning is
required to coordinate removal of all services and poles.
Where lighting is mounted on existing poles, pole
removal will be coordinated with installation of new
lighting. Similarly, where in conflict with proposed lighting, removal of existing overheads
may be required. These items need to be understood and accounted for in the initial
programing of the project.
PROJECT SPECIFIC APPROACH
In addition to undergrounding, this project will
include minor upgrades to the existing
stormwater collection system. The intent will
be to improve the stormwater collection in
conjunction with the ongoing upgrades to the
existing stormwater pump station located in
the northwest corner of the neighborhood.
Streetlights are sparse and inadequate. New
decorative lights will be installed to increase
lighting on the streets and pedestrian ways.
With relocation to front yards, service to new
lights will be easier served.
Although within easements, rear yard services pose difficulties for conversion. In many
cases, encroachment from fences, sheds, landscape, and other improvements from the
individual private property owner’s needs to be dealt with. Because of the type of
equipment required, removal of poles after conversion can also be difficult, especially given
the proximity of existing water services to remain.
D | Page 4
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION D - PROJECT APPROACH AND UNDERSTANDING
Each property will require an individual service to be run from the new transformers located
within the right-of-way to the existing point of service. Depending upon the location of the
existing point of service, running the new service could involve additional restoration costs
on private properties. The City’s level of responsibility for level of restoration needs to be
considered in defining the project scope.
FPL TARIFF PROGRAM
The FPL Tariff Program outlines how undergrounding projects are paid for. The two key
components are the Contribution-In-Aid-of-Construction (CIAC) and the Government
Adjustment Factor (GAF). The CIAC is the amount the applicant (in this case the CRA) pays
FPL for undergrounding, the GAF is the credit given when the applicant is a recognized
Government Agency.
The CIAC calculation is somewhat complicated. Additionally, the numbers used in the
calculation are populated entirely by FPL. The calculation first looks at the difference
between the cost of a new underground system compared to a new overhead system
(reflects upgrade provided to FPL from overhead to underground). The value of the existing
system and the cost to remove is added (reimbursement to FPL for the existing
improvements). The salvage value from removal of the existing system is deducted (salvage
puts money back in FPL’s pocket) and the operating costs over a 30-year period calculated
at net present value is added. From these numbers, a subtotal is derived. Depending upon
the project pole-miles, a percentage of the subtotal gets deducted to account for the
projected savings in storm restoration costs provided by undergrounding over a 30-year
period (because this is a Tier 3 project, the deduction is only 5%). Because of the way these
values are derived, it is possible that the CIAC is higher than the estimated cost of the
underground improvements.
The GAF waiver is more straight-forward. The waiver is a total of two parts: 25% of the
calculated CIAC, and 75% of the value calculated for storm restoration costs. The GAF
waiver will be more than 25% but likely less than 30%. This discount applies only to FPL
services. If the applicant installs the facilities, then GAF will be calculated from the adjusted
CIAC.
FPL provides the GAF to encourage undergrounding programs to be done under public
entities. FPL can’t drop the overheads until all services have been re-fed from
undergrounds. Service reconnections typically involve private entities. With the agreement ,
FPL puts the obligation for conversion on City/CRA. If all services not converted in timely
manner, creating a situation of where FPL is operating a duplicity of services, FPL fines the
City. Note that the tariff applies only to FPL. Other utilities will require agreements, design
fees, and payment for reconnecting services as well.
D | Page 5
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION D - PROJECT APPROACH AND UNDERSTANDING
CONCLUSION
Undergrounding requires significant coordination between FP&L, low voltage utilities, and
the stakeholders, both private and public. It requires an understanding of technical
requirements of the individual utilities applied to the physical limitations of constructing
within the right-of-way and impacts to individual residents. It requires a clear understanding
of procedure, effective communications, identification of stakeholders, coordination of utility
designs, understanding FP&L tariff requirements, cost estimates, and where applicable an
understanding of special assessment procedures and requirements.
D | Page 6
S
e
c
t
i
o
n
E
Q
u
a
l
i
f
i
c
a
t
i
o
n
I
n
f
o
r
m
a
t
i
o
n
a
n
d
A
s
s
i
g
n
e
d
P
e
r
s
o
n
n
e
l
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
QUALIFICATION INFORMATION
For over fifty-six (56) years Craven Thompson & Associates, Inc. (CTA) has provided
consulting services to governmental agencies throughout South Florida. In the past ten (10)
years we have provided some or all of the following services to numerous municipalities and
governmental agencies including: civil engineering, surveying, G.I.S., landscape architectural
and construction management services.
These entities include:
▪ City of Greenacres
▪ City of Boca Raton
▪ City of West Palm Beach
▪ City of Lake Worth
▪ City of Dania Beach
▪ City of North Lauderdale
▪ City of Hallandale Beach
▪ City of Sunrise
▪ City of Plantation
▪ City of Lauderdale Lakes
▪ City of Fort Lauderdale
▪ City of Hollywood
▪ City of Pompano Beach
▪ City of Oakland Park
▪ City of Coconut Creek
▪ City of Coral Springs
▪ City of Deerfield Beach
▪ City of Lauderhill
▪ City of Miramar
▪ City of Margate CRA
▪ City of Miami Gardens
▪ City of Miami Springs
▪ City of North Miami
▪ City of North Miami Beach
▪ City of Miami Beach
▪ City of Aventura
▪ Town of Lauderdale-by-the-Sea
▪ Town of Davie
▪ Town of Lake Park
▪ Broward County Highway Construction
and Engineering Division
▪ Broward County Water and Wastewater
Services
▪ School Board of Broward County
▪ Port Everglades
▪ Central Broward Water Control District
▪ Tindall Hammock Irrigation and Soil
Conservation District
▪ Tri-County Commuter Rail Authority
We have a successful track record in providing infrastructure survey, studies, design,
permitting and construction related services to numerous municipalities and governmental
agencies.
EXPERIENCE
CIVIL ENGINEERING
At CTA we offer a wide range of civil engineering capabilities that we coordinate with our
planners, surveyors, landscape architects and G.I.S. specialists, to provide a total
coordinated project from site evaluation to a completion. We take pride in our ability as
"problem solvers". This includes preparing studies, plans, calculations, and specifications,
permitting, conducting the necessary public meetings and hearings, bidding projects,
coordination with affected private property owners for the construction of the project,
inspecting the construction, performing contract administration for the construction, and
final certification of the project.
E | Page 1
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
Neighborhood Infrastructure Improvements, Roadway Improvements, Stormwater /
Drainage Improvements / Water/ Reuse Water / Sanitary Improvements
CTA has designed numerous projects which have included water distribution and
transmission systems, water services, fire hydrants, deep sewer systems, complex multiple
pumping stations, storm drainage, and roadway/right-of-way restoration for neighborhood
revitalization projects. Designs have included neighborhood improvements, roadways,
sidewalks, ADA improvements, water distribution systems, pumping stations, sanitary lift
stations, sanitary collection systems, force main, water quality BMPs, storm drainage,
stormwater quality improvements, and stormwater management.
We have extensive experience, knowledge and insight in the public outreach, design,
permitting, bidding and construction services of major infrastructure projects. Our
experience includes hundreds of miles of pipe installation for public entities.
Neighborhood Infrastructure Improvements
CTA has acted as the prime consultant on all of our neighborhood improvement projects.
Many of our large neighborhood projects have included extensive lengths of roadway and
right-of-way reconstruction.
▪ The North County Neighborhood Improvement Project, NE Quadrant, Bid Package 9
The North County Neighborhood Improvement Project
(NCNIP) Northeast Quadrant, Bid Package 9 included
approximately 152 acres of land between Dixie
Highway and Federal Highway, north of Sample Road.
Designed improvements included 38,863 linear feet
of roadway, 23,000 linear feet of sidewalk, and
14,000 linear feet of swale, 6,560 linear feet of storm
sewer, 8,920 linear feet of exfiltration trench and two
(2) stormwater control structures, a reuse water
distribution system consisting of 22,000 linear feet of
4” diameter, and 1,800 linear feet of 12” diameter
main, 57,000 linear feet of domestic water main and
40,000 linear feet of sanitary sewer collection and
transmission systems. CTA provided topographic
survey, design, permitting landscape architecture, and
construction engineering and inspection services. The
project was completed in 2012.
E | Page 2
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
▪ The North County Neighborhood Improvement Projects, NE Quadrant Bid, Package 10.
The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid
Package 10 included approximately 213 acres of land. The project included 47,520
linear feet of roadway reconstruction, and 53,460 linear feet of sidewalk construction.
Also included were 15,283 linear feet of swale, 6,508 linear feet of storm sewer, and
8,074 linear feet of exfiltration trench. Several
traffic calming devices were designed and
constructed as part of this Project. A reuse
water distribution system consisting of 32,900
linear feet was constructed on Bid Package 10,
as well as approximately 4,740 linear feet of
water main, 21 water services, 27,755 linear
feet of sanitary sewer collection and
transmission lines, and 475 laterals. CTA
provided topographic survey, design, permitting
landscape architecture, and construction
engineering and inspection services. The
project was completed in 2013.
▪ The North County Neighborhood Improvement Projects, NE Quadrant Bid, Package 11.
The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid
Package 11 included approximately 357 acres of land between Dixie Highway and
Federal Highway, north of Sample Road in Broward County. The project included over
50,688 linear feet of new roadway construction, sidewalks, driveway aprons, and sodded
swales In addition the project included over 14,777 linear feet of new storm sewer,
12,993 linear feet of exfiltration trench, 64,000 linear feet of water main, 553 Water
Services (many of these services were moved from the rear of the lot to the front),
49,700 linear feet of reuse water main, 796 reclaimed water services, 43,805 linear
feet of gravity sewer main, 750 sewer laterals, lift station, and 1,630 linear feet of force
main. CTA provided surveying, civil engineering, landscape architecture and CEI services
on the project. The project was completed in 2014.
▪ The North County Neighborhood Improvement Projects, NW Quadrant.
The North County Neighborhood Improvement Project (NCNIP) NW Quadrant is a project
which includes approximately 650 acres of land between Dixie Highway and I-95, North
of Sample Road, Roadway improvements included 115,596 linear feet of roadway, along
with 104,637 linear feet of sidewalk, and storm sewer included 17,006 linear feet of
pipe, and there were 33,191 linear feet of exfiltration trench. Additionally, the sanitary
sewer collection system consisted of 70,783 linear feet of gravity main, 14,253 linear
feet of force main, and four (4) lift stations. The water distribution system additions
included 86,112 linear feet of watermain and 1,590 water services CTA provided
topographic survey, design, permitting landscape architecture, and construction
engineering and inspection services. The project was completed in 2012.
E | Page 3
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
▪ The South County Neighborhood Improvement Project
The South County Neighborhood Improvement Project (SCNIP) includes approximately
1,400 acres of land between State Road 7 and I-95, south of Pembroke Road. The
project included the design, permitting, bidding and construction consisting of 53 miles
of roadway, 181,000 linear feet of storm sewer (including exfiltration trench), 140,618
linear feet of water main, 236,226 linear feet of gravity sanitary sewer, and 80 miles of
sidewalk. This project also included abandoning in-place and grouting over 50,000
linear feet of existing water main. CTA provided topographic survey, design, permitting
landscape architecture, and construction engineering and inspection services on each of
these projects. The project was completed 2006.
▪ The Miami Gardens Livable Neighborhoods Improvement Project
The Livable Neighborhoods Improvement Project includes approximately 222 total acres
of land subdivided among four separate sites;
namely Garden Circle, Kings Garden I & II, Kings
Garden III and Vista Verde. The project includes:
34,200 linear feet of roadway, 7,840 linear feet of
sidewalk, 19,000 linear feet of storm sewer, 151
drainage structures, the regrading of 22,500
linear feet of swales, and the addition of 112
street lights, along with street trees and
landscape/hardscape. The project began in 2009
and is continuing at present. Four phases are
complete.
▪ The Garden Acres Neighborhood Improvement Project
Garden Acres was a single-family residential neighborhood approximately with an area of
approximately 24 acres. The new drainage system consists of 4” deep roadway swales,
drainage pipes and structures, exfiltration trenches and two controlled discharge points
into an existing drainage system located within the NE 6th Avenue right-of-way. The
roadway swales help with the storage and convey the runoff from the roadway and the
house lots. The swales and exfiltration trenches handle the water quality volume
generated by the roadway right-of-way area. CTA analyzed the system using ICPR
software. CTA provided design, permitting and CEI services for the project. The roadway
restoration consisted of 4,985 linear feet of roadway. The drainage system consisted of
2,136 linear feet of storm sewer, 4,171 linear feet
and of exfiltration trench. The project also
included major roadway, water and sanitary sewer
improvements. The water improvements
consisted of 5,591 linear feet of 6” diameter
main, and 962 linear feet of 8” diameter main.
The sanitary improvements consisted of 7,045
linear feet of 8” diameter sewer, 218 linear feet of
4” diameter forcemain, and 1,044 linear feet of 6”
diameter forcemain. Improvements included two
lift stations. The project was completed in 2014.
E | Page 4
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
Street/Roadway
Craven Thompson & Associates, Inc. (CTA) is working on or has recently completed (within
the past ten (10) years) the design and permitting of a significant number of roadway
projects including:
▪ 6th Avenue South Roadway and Streetscape Improvements, Lake Worth
▪ Floranada Avenue Traffic Calming Improvements, Oakland Park
▪ Davie CRA Parking Areas
▪ NE 5th Avenue Streetscape, Oakland Park
▪ NE 34th Court Complete Streets Project, Oakland Park
▪ NW 38th Street Complete Streets Project, Oakland Park
▪ Miramar Historic Area Complete Streets – Phase II, Miramar
▪ NW 21st Avenue, Broward County
▪ SW 41st Place, Davie
▪ Roadway improvements involving: North M Street, North K Street, North F Street, North J
Street, 11th Avenue North, and 15th Avenue North, Lake Worth
Additionally, we have just completed the design of intersection traffic calming improvements
to the following intersections in 2015 for the City of North Miami:
▪ NW 123rd Street/NW Miami Court
▪ NW 123rd Street/NW 1st Court
▪ NW 139th Terrace/NW 5th Court
These roadways included utilities such as sanitary and water, and drainage improvements.
In addition, we surveyed, designed, permitted and provided CEI services for hundreds of
miles of reconstructed roadway in our Neighborhood Improvement Projects.
Stormwater/Storm Sewer/Drainage
CTA has prepared master plans, conceptual
permits, and studies. We have designed,
permitted, bid and managed the construction of
thousands of acres of stormwater infrastructure
improvements. CTA understands the importance
of flood protection measures, as standing water
promotes unhealthy conditions as well as inhibits
essentials services from accessing the area.
Within the past ten (10) years CTA has prepared
comprehensive stormwater management plans for
the Cities of Aventura, Hallandale Beach, Sunrise,
Miami Gardens, Greenacres, the Town of Davie,
and the Study Area #1 modification for Pompano Beach. In addition, we are the drainage
engineers for Tindall Hammock Irrigation and Soil Conservation District (THISCD), and the
E | Page 5
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
Central Broward Water Control District (CBWCD) providing planning, capital improvements
costs, design and construction administration services which resolved flooding and
environmental concerns for the Cities. CTA has performed major and minor stormwater
basin studies and has implemented recommendations of those studies through design,
permitting, & CEI of basin-wide improvements. Our stormwater master planning projects
include computer modeling using Streamline Technologies ICPR Software as well as
PCSWMM, the commercial version of US EPA SWMM5 Software. CTA has used the ICPR for
the past twenty (20) years, and utilizes the latest update, V4.
We have designed and permitted over 400,000 linear feet of storm sewer and exfiltration
trench. These designs have included sustainable practices such as the design of bio-swales,
exfiltration trench, tidal backflow devices, STORMCEPTORS, and wetland/retention preserve
areas.
CTA has recently created the Stormwater
Master Plan for the City of Hallandale
Beach (2,816 Acres), the Western C-11
Basin Study for the CBWCD (15,952 acres),
and for a major portion of the City of
Greenacres known as Original Section (250
Acres). These projects included
development of scheduled improvements
to be implemented over a number of fiscal
years to mitigate flooding conditions. We
are currently working as the Prime with our
sub-consultant, Hazen and Sawyer, on the
Comprehensive Stormwater Master Plan for
Aventura; and we are a sub-consultant to Hazen and Sawyer (the Prime) on the City of Fort
Lauderdale Durrs & River Oaks Neighborhood Storm Water Improvement Implementation
Project, and also are in the process of completing the East Basin Study (14,938 acres) for
the CBWCD.
Water and Sanitary
Within the past ten (10) years CTA has completed numerous sections of the Utility Zone
Analysis (UAZ) Program (including both water and sanitary sewer), City of Lake Worth
Watermain Replacement, City of Hollywood Watermain Replacement, City of Plantation
Watermain Replacement, the City of Oakland Park Watermain and Sanitary Replacement,
and the Town of Davie Watermain and Sanitary Replacement. CTA has surveyed, designed,
permitted, bid and managed the construction of thousands of acres/feet of watermain,
sanitary, and lift station infrastructure.
E | Page 6
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
The following table demonstrates our extensive experience in the potable water &
wastewater design discipline:
Governmental
Entity
Watermain
(LF)
Sanitary
(LF)
Forcemain
(LF)
ROW
Rest. (LF)
Water
Services
(EA)
Lift
Stations
(EA)
Broward County 690,000 676,000 73,000 700,000 5,000 45
Oakland Park 49,000 7,000 7,000 41,200 800 9
Hollywood 246,000 0 0 123,000 1,500 2
Lake Worth 20,000 0 0 14,300 510 0
Plantation 51,000 0 0 43,500 520 0
North Miami Beach 14,500 0 0 4,600 170 0
Davie 28,000 12,750 3,000 29,800 260 0
Greenacres 1,000 7,500 0 6,400 0 0
TOTAL 1,099,500 703,250 83,000 962,800 8,760 56
CTA has not only designed, permitted, bid and constructed over a million feet of pipe, but we
have provided accurate estimating of construction costs which is a critical aspect in
appropriating proper funding for these projects. CTA has estimated, on average,
construction costs to within 6% of the actual Bid Cost.
SURVEYING AND MAPPING
Providing Surveying services has been, and continues to be, an important portion of CTA’s
business since 1962. Through selection and training of personnel and a program to obtain
the best equipment available, we have developed a skilled and technically equipped
Surveying Department, capable of conducting
almost any type of survey. We are qualified and
certified by the State of Florida, Department of
Natural Resources, for both horizontal and
vertical control for Second Order accuracy. In
addition to conventional boundary topographic
and construction surveys, we have the
experience to provide the latest in 3D Laser
Scanning - High Definition Surveying, Geodetic
Control, PLSS Retracement, Hydrographic,
Cadastral, Photogrammetric Control, Right-of-
Way and Construction Surveys.
Over the years, we have provided surveying services to over twenty-five municipalities and
the following governmental and quasi-governmental agencies, including:
▪ Florida Department of Environmental Protection
▪ Florida East Coast Railway
▪ Florida Department of Transportation
▪ Florida GAS
E | Page 7
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
▪ Port Everglades Authority
▪ Broward County Highway Construction and Engineering Division
▪ Broward County Water and Wastewater Services
▪ Waste Management Inc.
▪ Central Broward Water Control District
▪ Tri-County Commuter Rail Authority
▪ Seminole Tribe of Florida
Some of our recent projects include:
▪ Lake Worth 2020 Master Plan Year 1
Improvements Survey
▪ Lake Worth 2” Watermain Replacement
Program Phase 2 Survey
▪ Greenacres Original Section Survey
▪ Greenacres Hydrographic Survey
▪ Lake Park Canal Outfall Survey
▪ North Riverside Right-of-Way Survey
▪ Hallandale Beach City-Wide Survey
▪ Plantation Watermain Rehabilitation Route
Survey
▪ Apollo Park Survey
▪ Port Everglades Sketch and Legal Descriptions
▪ Broward County Convention Center Boundary Survey
▪ Lauderdale Lakes Canal Cross-Sections
▪ Central Broward Water Control District Canal Cross-Sections
▪ Greenacres 10th Avenue North Intersection and Sanitary Sewer Survey
▪ City of Oakland Park NE 38th Avenue Complete Streets Survey
▪ City of North Miami Survey and Plat Review
In addition, CTA’s GIS project experience includes:
▪ Broward County Regional Reuse Water Master Plan through Broward County Natural
Resources Department
▪ Fire Hydrant Maintenance Program for the City of Sunrise
▪ City of North Miami Beach Water & Sewer Service Area G.I.S. system
▪ Commercial Stormwater Assessment GIS database for the City of Oakland Park
E | Page 8
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
LANDSCAPE ARCHITECTURAL SERVICES
The Landscape Architecture Department at CTA was created in 1985 when its first
Registered Landscape Architect joined the team. The Landscape Architecture Department
was created in response to increased public and private concern for natural systems,
environmental quality and community
appearance. CTA has been actively engaged in
Landscape Architecture ever since, resulting in
hundreds of impressive landscape architectural
projects in South Florida. Our Landscape
Architects are readily available to provide services
to conduct site planning for the initial conceptual
planning stages of a project, as well as the
landscape, hardscape, site amenity and irrigation
plans.
CTA has designed many projects within the tri-county area, including complete streets,
streetscape, parks, median beautification, traffic calming, and irrigation design. Aesthetic
features, such as street lights, trees, berming, shrubs and other landscaping can contribute
to the unique character of a street and assist in mitigating resident concerns with regards to
traffic, noise, and security concerns. Within the past five (5) years, CTA has completed two
complete streets projects in Oakland Park (NE 34th Court & NE 38th Street) and are currently
designing the Miramar Historical Area Complete Streets Project – Phase II. Recently, we
also developed the Bicycle/Pedestrian Greenways & Trails Master Plan for the City of
Sunrise. CTA has also finished a number of streetscape and traffic calming projects
including: NE 5th Avenue Streetscape & Reconstruction; 6th Avenue South Streetscape;
North Miami Roadway Intersection Traffic Calming (3 intersections); the Floranda Road
Traffic Calming Project; and we are nearing completion of the NE 14 th Avenue Streetscape
Project.
CTA median beautification projects include: Oakland
Park Boulevard Median Beautification; Powerline
Road Median Enhancements; and we are working
on the Miramar Parkway & Miramar Boulevard
Median Enhancements. Our experience also
includes the Miami Springs Citywide ADA Ramp
Improvements, and the Hallandale Beach CDBG
Sidewalk Improvements Project. Our experience
includes many additional roadway and landscape
architectural projects over the past five (5) years.
CTA designed approximately seventy (70) miles of Greenways in Broward County. These
included the C-14 Canal/Cypress Creek Greenway, New River/SR 84 Greenway, Flamingo
Road Trail, Dixie Highway/FEC Trail and Griffin/Orange Drive Greenway. Many of our other
projects include master plans, design, permitting and construction services for streetscapes,
median landscaping and hardscape, right-of-way enhancements, active and passive parks,
E | Page 9
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
recreational amenities for upscale residential projects, landscape and hardscape for
libraries, community centers, fire stations, city halls, and urban redevelopment throughout
South Florida.
CTA’s active park design, permitting, and construction experience involves preparing design
documents that include sports fields, path systems, exercise trails, vehicular circulation,
stormwater detention, play areas, visitor facilities and interpretive signage. Our passive
park projects incorporate elements, including a number of nature trails, picnic areas, and
gathering spaces that take advantage of existing natural features. Passive parks can also
act as social spaces for people to interact. The maintaining of natural green space is not
only environmentally important, but moreover, is much less costly from a maintenance
perspective. Recently completed or current park projects include: Bluesten Park, Sawgrass
Sanctuary Park, Pine Island Road & NW 50th Street Athletic Complex, Oak Hammock Park,
Oscar Wind Park, Flamingo Park, the Urban Art Park, Jaco Pastorius Park, and Waterways
Park.
Our landscape architects create master plans, designs for public facilities such as libraries,
community centers, city halls and other municipal facilities that promote the building
architecture and emphasize the character of the surrounding neighborhood. We consider
that a building is not an invasion of the landscape,
but a vital extension of it. Where a building rests on
the land, and how it rests on the land, sets the
context for its evolving construction, development,
and use. We have designed a number of right-of-way
landscaping and traffic calming projects in the South
Florida area. Aesthetic features, such as street
lights, trees, berming, shrubs and other landscaping,
can contribute to the unique character of a street
and assist in mitigating resident concerns with
regards to traffic, noise, and security concerns.
CONSTRUCTION ENGINEERING & INSPECTION
CTA has extensive experience with Construction Administration Services such as Reside nt
Project Representative Services, and Construction Inspection Services, and various other
services during construction of improvements. Our services include inspections, progress
meetings, reports, pay request processing, change order negotiation and processing, and all
other aspects involved in providing Resident Project Representative Services to our Clients.
CTA has provided Construction Administration services for over 6,000 acres of infrastructure
replacement / rehabilitation for the past twenty-five (25) years. CTA’s vast wealth of
experience in Construction Administration for Neighborhood Redevelopment Improvement
Projects in both suburban and urban settings is unrivaled by any firm in South Florida. Our
Construction Management Department has provided these services to Private and Public
clients with great success in the past and moving into the future.
E | Page 10
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
Sub-Consultants
Hillers Electrical Engineering – Electrical Engineering & Lighting
Contact: Mr. Paul Hillers, P.E., President
23257 State Road 7, Suite 100
Boca Raton, Florida 33428
Phone: (561) 451-9165
Email: phillers@hillersee.com
Company Overview: Hillers Electrical Engineering, Inc. (HEE) has been in business since
1994 and is located in Boca Raton, Florida. Hillers Electrical Engineering, Inc. brings over
200 years of unsurpassed experience, expertise, and personalized service in electrical
engineering design, control application programming, and construction management. HEE
specialize in electrical engineering design and control application programming. Our
electrical design services include power, control, instrumentation, telemetry for major air
carrier and general aviation airports, DOT roadway systems, water and wastewater
treatment facilities, multi-sports complexes, storm water pumping and control structures,
fueling systems and seaport storage and handling facilities for federal, state, county and
municipal agencies, as well as private owners. We have over 115 years of collective
electrical design and project management experience on a variety of projects, ranging from
small $2,500 projects to over $50 million in cost.
KAMM Consulting - Mechanical Engineering
Contact Information:
Mr. Art Kamm, P.E., President
1407 West Newport Center Drive
Deerfield Beach, Florida 33442
Phone: (954) 949-2200
Email: art@kammconsulting.com
Company Overview: KAMM Consulting, Inc. has extensive experience in the design of
modern HVAC systems ranging from complex commercial/industrial applications utilizing
state of the art technologies to sophisticated residential systems. Indoor air quality (IAQ)
concerns and the ongoing drive for efficient energy utilization are major factors in their
designs. Their HVAC engineers are expert in the broad range of climatic and building
conditions that impact the performance of a design. Their experience in South Florida
uniquely qualifies Kamm Consulting for this market. They use state-of-the-art software and
methods to perform heat load and energy calculations.
✓ Site Evaluation and Planning
✓ Reliability Studies
✓ Point-of-failure Analysis
✓ Relocation Evaluations
✓ Merger / Consolidation Studies
✓ Mechanical HVAC Design
✓ Electrical Design
✓ Uninterruptible Power Design
✓ Back-up Standby Power Design
✓ Fire Protection Engineering
✓ Voice and Data Communications
Design
✓ LEED® design services
E | Page 11
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
InfraMap Corp. - Subsurface Utility Locates
Contact Information:
Mr. Andres Garcia, Utility Location Manager, ULM
1860 Old Okeechobee Road, #201
West Palm Beach, Florida 33409
Phone: (561) 586-0790
Email: agarcia@Inframap.net
Company Overview: InfraMap is a leading provider of Utility Infrastructure Mapping and
Subsurface Utility Engineering (S.U.E.) services. InfraMap collects utility infrastructure data
in the field using sophisticated geophysical techniques and instrumentation (including GPR),
with automated data collection gear and state of the art survey equipment. InfraMap then
merges this information onto their client’s base mapping in their desired format. They
collect and present this data to aid their clients in reducing the design and construction cost
of major infrastructure projects.
Founded in 1987, InfraMap is a utility infrastructure mapping specialist. Their clients are
State and Local Transportation Departments, Airports, Port Authorities and Utilities.
InfraMap has performed some of the largest utility mapping projects ever undertaken by any
firm. InfraMap has the resources to perform and deliver multiple large-scale projects on
time, throughout the United States, as evidenced by their past and recent performance.
Absolute Civil Engineering Solutions – Geotechnical & Testing
Contact Information:
Ms. Tiffany Leal, President
4121 SW 47th Avenue, Suite 1319
Davie, Florida 33314
Phone: (954) 349-8797
Email Address: tleal@absoluteces.com
Company Overview: Absolute Civil Engineering Solutions (ACES) is a Certified M/WBE firm
offering a full range of engineering and testing services from pre-construction through post-
construction. On a daily basis, ACES provides consulting services to both the private and
public sector, including: owners, developers, architects, general contractors, property
management companies, school boards, Departments of Transportation and municipalities.
At ACES, they are focused on knowing their Clients’ project goals, helping create cost
savings and communicating effectively. As ACES progresses through their work assignments,
they continually keep their clients updated on project findings. ACES is communication
oriented, with positive, action-oriented attitudes. The mission of ACES’ principals is to
continue growing a geotechnical, environmental and construction materials testing
consulting firm that listens to their Clients, develops a clear understanding of their Clients’
needs and goals, and tailors its services to meet those needs in a quality, timely, and cost -
effective manner. Simply stated, ACES’ goal is to be the leader in their profession and to set
the standards that other consultants in their industry strive to obtain. Based on feedback
from their Clients, ACES has and continues to meet and exceed their expectations. The
E | Page 12
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
people who makeup ACES are truly some of the best engineers and technical professionals
in the industry. Experience, technical ability and commitment to Client service from each
and every staff member of ACES are the simple secrets to their success.
Masuen Consulting - Irrigation Designers
Contact Information:
Ms. Michele Masuen, President
32801 Highway 441 N. #293
Okeechobee, Florida 34972
Phone: (866) 928-1533, Extension 114
Email: michele@masuenconsulting.com
Company Overview: Masuen Consulting LLC, is an Outdoor Water Management and
Sustainability Consulting firm comprised of landscape architects, horticulturalists,
agronomists, agricultural engineers, water resource engineers, environmental engineers,
irrigation designers, landscape designers, site planners, and construction/project managers.
The firm is dedicated to providing clients with services focused on water conservation,
resource & cost sustainability, operational efficiencies, regulatory compliance, and
exemplary service. Everything Masuen Consulting LLC delivers is the result of a critical
thinking, ‘out of the box’, oriented mindset guided by a senior management team with over
eighty-five (85) years of combined experience in the landscape, golf, government, and
agricultural industries.
The consulting firm was created with the sole focus of bringing science based, field verified
solutions to the Landscape, Golf, Government, and Agricultural marketplaces. As industry
professionals with expertise in soils, plants, water, hydraulics, design theory, water shed
analysis and management, and construction/project management, we develop and
implement successful ‘holistic’ outdoor water management solutions to meet each client’s
unique needs.
Masuen Consulting has been providing proven solutions to real world problems in the
outdoor water management and sustainability arenas for almost twenty (20) years. The
company consists of three divisions; 1) Design, 2) Technical Consulting and 3) Water
Management. Masuen Consulting, LLC offers its services throughout the United States and
overseas. Masuen has offices in Florida, Georgia, Texas, and Washington State.
E | Page 13
STANDARD FORM 330
0ARCHITECT - ENGINEER QUALIFICATIONS
PART I - CONTRACT-SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (City and State)
Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA),
Sunny Isles Beach, Florida
2. PUBLIC NOTICE DATE
August 10, 2018
3. SOLICITATION OR PROJECT NUMBER
RFQ No. 18-08-01
B. ARCHITECT-ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Patrick J. Gibney, P.E., Vice President, Engineering
5. NAME OF FIRM
Craven Thompson & Associates, Inc.
6. TELEPHONE NUMBER
(954) 739-6400
7. FAX NUMBER
(954) 739-6409
8. E-MAIL ADDRESS
pgibney@craventhompson.com
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)
(Check)
9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
PR
I
M
E
J -V
P
A
R
T
N
E
R
SU
B
C
O
N
-
TR
A
C
T
O
R
a. X
Craven Thompson &
Associates, Inc. S
CHECK IF BRANCH OFFICE X
, Inc.
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
Land Surveying, Utility Coordination,
Easement Preparation, Public
Information Support, Permitting, Project
Evaluation & Approach, Highway & Civil
Engineering, Landscape Architecture,
Program Management, Cost Estimates,
Utility Negotiations, Construction
Review & Administration. Bid Document
Preparation / Review / Evaluation
b. X
Absolute Civil Engineering
Solutions, LLC
CHECK IF BRANCH OFFICE
4121 SW 47th Ave., Suite 1319
Davie, Florida 33314
Geotechnical Engineering and Testing
c. X
Hillers Electrical
Engineering, Inc. CHECK IF BRANCH OFFICE
23257 State Road 7, Suite 100
Boca Raton, Florida 33428 Electrical Engineering & Lighting
d. X
Masuen Consulting, LLC
CHECK IF BRANCH OFFICE
32801 Highway 441 N., #293
Okeechobee, Florida 34972
Landscape Irrigation Design
e. X
Kamm Consulting
CHECK IF BRANCH OFFICE
1407 West Newport Center Drive
Deerfield Beach, Florida 33442 Mechanical Engineering
f. X
InfraMap Corp.
CHECK IF BRANCH OFFICE
1860 Old Okeechobee Road
West Palm Beach, Florida 33409
Sub-Surface Utility Locates
D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached)
E | Page 14
STANDARD FORM 330
PART I - CONTRACT-SPECIFIC QUALIFICATIONS
D. Organizational Chart of Proposed Team
PROJECT MANAGER
Tim J. Hall, P.E.
LEAD LANDSCAPE ARCHITECT
Joseph D. Handley R.L.A.
CONSTRUCTION
MANAGEMENT/ADMINISTRATION
Don Shaver
LEAD SURVEYOR
Richard D. Pryce, P.S.M.
IRRIGATION DESIGN
Judy Jensen
GEOTECHNICAL
ENGINEERING & TESTING
Wayne Webb, P.E.
ELECTRICAL
ENGINEERING & LIGHTING
James Kappes, P.E.
Amy Champagne-Baker, P.E.
PRINCIPAL-IN-CHARGE
Patrick J. Gibney, P.E.
CIVIL ENGINEERING
Douglas Taylor, P.E.
Matthew Cigale, P.E.
MECHANICAL
ENGINEERING
Art Kamm, P.E., CxA, LEED AP
Mircia Pella, P.E., LEED AP
SUB-SURFACE UTILITY
LOCATES
Andres Garcia, ULM
E
|
P
a
g
e
1
5
STANDARD FORM 330
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Patrick J. Gibney, P.E.
13. ROLE IN THIS CONTRACT
Principal-In-Charge
14. YEARS EXPERIENCE
a. TOTAL
31
b. WITH CURRENT FIRM
25
15. FIRM NAME AND LOCATION (City and State)
Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
16. EDUCATION (DEGREE AND SPECIALIZATION)
Rutgers, The State University, Bachelor of Science,
Civil Engineering (1987)
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Engineer - Florida No. 49428 (1995)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
American Society of Civil Engineers
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Original Section Drainage Improvements
Greenacres, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2014 - 2015
CONSTRUCTION (If applicable)
2016 (Phase I
Complete)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Mr. Gibney was Project Manager. The project required 4,500 linear feet of drainage pipe, 21,615 linear feet of
ditch re-shaping, longs lengths of sidewalk replacement, driveway restorations, and pavement restoration. The
Phase 1 project required installation of 500 linear feet of 36” RCP storm pipe, 1,010 linear feet of 24” RCP
Storm Pipe, 156 linear feet of 18” RCP Storm Pipe, 156 linear feet of 12”x18” RCP storm Pipe, significant ditch
reshaping, sidewalk replacement, and replacement of outfall to LWDD canal.
b.
(1) TITLE AND LOCATION (City and State)
North County Neighborhood Improvement Project, Northwest
Quadrant, Broward County, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2011
CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for roadway improvements included 115,596 linear feet of roadway, along with 104,637 linear
feet of sidewalk, and storm sewer included 17,006 linear feet of pipe, an d there were 33,191 linear feet of
exfiltration trench.
c.
(1) TITLE AND LOCATION (City and State)
North County Neighborhood Improvement Project, NE,
Quadrant, Bid Package 10, Broward County, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2008
CONSTRUCTION (If applicable)
2013
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager – The project consisted of approximately 213 acres of land. It included 47,520 linear feet of
roadway reconstruction, and 53,460 linear feet of sidewalk construction. Also , included were 15,283 linear
feet of swale, 6,508 linear feet of storm sewer, and 8,074 linear feet of exfiltration trench.
d.
(1) TITLE AND LOCATION (City and State)
North County Neighborhood Improvement Project, NE,
Quadrant, Bid Package 11, Broward County, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2009
CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The project included over 50,688 linear feet of new roadway construction, sidewalks, driveway aprons, and
sodded swales. In addition, the project included over 14,777 linear feet of new storm sewer, 12,993 linear feet
of exfiltration trench, 64,000 linear feet of water main, 553 Water Services.
e.
(1) TITLE AND LOCATION (City and State)
North Central County Neighborhood Improvements Project
Broward County Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2004
CONSTRUCTION (If applicable)
2012
3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager. This consisted of approximately 21 miles of roadway, 28,359 linear feet of sanitary lines,
21,308 linear feet of watermain, and 17.5 miles of sidewalk. North Central County Neighborhood Improvement
Project includes approximately 945 acres of land located generally between Sunrise Boulevard, NW 26 th Street,
Interstate 95 and the Wingate Canal in Broward County, Florida.
E | Page 16
STANDARD FORM 330
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Timothy J. Hall, P.E.
13. ROLE IN THIS CONTRACT
Project Manager
14. YEARS EXPERIENCE
a. TOTAL
31
b. WITH CURRENT FIRM
11
15. FIRM NAME AND LOCATION (City and State)
Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
16. EDUCATION (DEGREE AND SPECIALIZATION)
University of Maryland (Structural Emphasis, Bachelor of
Science, Civil Engineering (1987)
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Engineer - Florida No. 50588 (1996)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
City of Sunny Isles Beach, Utility Undergrounding,
Sunny Isles Beach, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2010
CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project lead for the City of Sunny Isles Beach undergrounding efforts. Project included undergrounding of overhead
electrical, telephone, and cable within 2.1 miles along Collins Avenue (A1A). Significant coordination required
between FP&L, low voltage utilities and FDOT requirements. Understanding of technical requirements and
restrictions of both FDOT and utilities required to deal with the limitations of constructing within the right-of-way.
b.
(1) TITLE AND LOCATION (City and State)
Fort Lauderdale, Undergrounding of Utilities Continuing Services,
Fort Lauderdale, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2009
CONSTRUCTION (If applicable)
2011
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
In 2009, the City awarded the general services contract to assist in facilitating the undergrounding of utilities within
neighborhood through special assessment. Projects required a clear roadmap of procedure, ability to
communicate effectively with residents, coordination of utilities, understanding of FP&L tariff and requirements,
assistance in drafting proper ordinance, cost estimates, and understanding of special assessment procedures and
requirements.
c.
(1) TITLE AND LOCATION (City and State)
City of Fort Lauderdale - WW2011 Program,
Fort Lauderdale, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
September 2003
CONSTRUCTION (If applicable)
June 2011
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Lead for design services related to City’s Capital Improvements Program which included approximately
$636 million in utilities infrastructure repair, replacement, and upgrades. The program includes analysis, modeling
and design for improvements to water and wastewater facilities in meeting a comprehensive plan in response to
expanded demand and service areas.
d.
(1) TITLE AND LOCATION (City and State)
North Miami Beach General Consulting Services,
North Miami Beach, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2015 - Present
CONSTRUCTION (If applicable)
Varies
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Mr. Hall has been the project manager for a number of utility projects for the City of North Miami Beach
e.
(1) TITLE AND LOCATION (City and State)
City of Fort Lauderdale - General Engineering Services Contract
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2006
CONSTRUCTION (If applicable)
2014
3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Coordinator and point of contact for engineering, landscape, survey, and architectural services provided to
the City through open-ended contract. In addition to management of multiple projects, responsible for overseeing
design, commitment to schedule and meeting budgets for multi-facetted improvement projects. Projects include
programs to provide water and wastewater improvements to existing neighborhoods served by septic systems and
without adequate fire protection. Areas served include a mixture of single family, multi -family, commercial, office
and industrial uses. In addition to utilities, improvements included streetscape, landscape, drainage, roadway re -
alignment and traffic calming.
E | Page 17
STANDARD FORM 330
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Matthew Cigale, P.E.
13. ROLE IN THIS CONTRACT
Civil Engineer
14. YEARS EXPERIENCE
a. TOTAL
21
b. WITH CURRENT FIRM
19
15. FIRM NAME AND LOCATION (City and State)
Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science, Civil Engineering, Clarkson University,
Potsdam, New York (1996)
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Engineer - Florida No. 74584 (2012)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Member, American Society of Mechanical Engineers, Computer Skills: AutoCAD, MicroStation, SewerCAD, WaterCAD
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
North County Neighborhood Improvement Project
Northwest Quadrant, Broward County, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2011
CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Engineer for roadway improvements included 115,596 linear feet of roadway, along with 104,637 linear feet of
sidewalk, and storm sewer included 17,006 linear feet of pipe, and there were 33,191 linear feet of exfiltration
trench.
b.
(1) TITLE AND LOCATION (City and State)
Garden Acres Neighborhood Improvements
City of Oakland Park, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2012
CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Engineer responsible for preparation of Contract Documents, Permitting and Construction Management for
25-acre residential infrastructure improvement(s) retrofit within the City of Oakland Park. Services included:
roadway design; stormwater design; water distribution system design; wastewater collection & transmission
systems design; permitting; bidding assistance and construction administration.
c.
(1) TITLE AND LOCATION (City and State)
North Central County Neighborhood Improvement Project
Broward County, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2004
CONSTRUCTION (If applicable)
2012 (Phased)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Engineer. This consisted of approximately 21 miles of roadway, 28,359 linear feet of sanitary lines, 21,308
linear feet of watermain, and 17.5 miles of sidewalk. North Central County Neighborhood Improvement Project
includes approximately 945 acres of land located generally between Sunrise Boulevard, NW 26th Street, Interstate
95 and the Wingate Canal in Broward County, Florida.
d.
(1) TITLE AND LOCATION (City and State)
Lake Worth 2020 Master Plan – Year 1 Improvements
Lake Worth Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2013 - 2014
CONSTRUCTION (If applicable)
In Progress
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project includes design, permitting, Year 1 of the Lake Worth 2020 Master Plan. The project includes the
rehabilitation of right-of-way infrastructure including roads, alleys, curb, sidewalk, hardscape, drainage, and
potable water. The project includes over 13,000 linear feet of roadway and storm sewer along with in excess of
6,000 linear feet of water main.
e.
(1) TITLE AND LOCATION (City and State)
North County Neighborhood Improvement Project, NE Quadrant
Broward County, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2007
CONSTRUCTION (If applicable)
2014 (Phased)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Engineer assisted in design of project consisting of roadways, alleys, sidewalks, swales, drainage, sanitary sewer
and watermain.
E | Page 18
STANDARD FORM 330
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Douglas R. Taylor, P.E.
13. ROLE IN THIS CONTRACT
Civil Engineer
14. YEARS EXPERIENCE
a. TOTAL
34
b. WITH CURRENT FIRM
7
15. FIRM NAME AND LOCATION (City and State)
Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
16. EDUCATION (DEGREE AND SPECIALIZATION)
University of Illinois (UIUC)
Bachelor of Civil Engineering (1984)
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Engineer - Florida No. 50569 (1996)
Professional Engineer - IL No. 44542 (1988)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
-FEMA ICS 100,200,700,800 - FEMA G300, G400) -Florida Green Building Council -Florida Redevelopment Association APWA
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
LW 2020 Mater Plan Year 1 Improvements
Lake Worth, Florida
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2013 - 2014 In Progress
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Director. Project includes design and permitting. Year 1 of the Lake Worth 2020 Master Plan. The
project includes the rehabilitation of right-of-way infrastructure including roads, alleys, curb, sidewalk, hardscape,
drainage, and potable water. The project includes over 13,000 linear feet of roadway and storm sewer along
with in excess of 6,000 linear feet of watermain.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami Gardens Livable Neighborhood Improvement Project,
Miami Gardens, Florida
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2009 - Present 2010 - Present
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The Livable Neighborhoods Improvement Project includes approximately 222 total acres of land . The project
includes: 34,200 linear feet of roadway, 7,840 linear f eet of sidewalk, 19,000 linear feet of storm sewer, 151
drainage structures, the regrading of 22,500 linear feet of swales, and the addition of 112 street lights, along
with street trees and landscape/hardscape.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Eastside Infrastructure Improvements, Phases 2 & 3
Town of Davie, Florida
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2015 2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Engineer for 18,940 linear feet of storm sewer, the reconstruction of 5.2 miles of roadway. 14,800 linear
feet of 6" diameter main, 5,075 linear feet of 8" diameter main, and 5,,140 linear feet of 12" diamete r main,
455 linear feet of 8" diameter sanitary sewer, 40 sanitary manholes and 2,945 linear feet of 16" diameter
forcemain.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami Springs City-Wide ADA Ramps
Miami Springs, Florida
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2015 2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Mr. Taylor assisted with the design and permitting of new and replacement ADA ramps throughout the City. The
project is funded through the legislative appropriation process. The project includes field evaluation of
intersections throughout the City to determine the location of non-conforming or missing ADA ramps. CTA
developed a set of construction plans for installation of the ramps per FDOT standards.
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Traffic Calming at the Intersections of 123rd Street & NW 1st
Court, 123rd Street & Miami Court, NW 139th Terrace & NW
5th Court, North Miami
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2015 2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Lead Engineer - The project involved the development of designs for traffic calming features along NW 123th
Street and NW 1st Court, NW 123rd Street and NW Miami Court, and 139th Street NW 5th Court in the City of North
Miami. These intersections had large expanses of pavement without traffic control and therefore required the
implementation of traffic calming features. CTA design elevated intersections, removed pavement and
introduced curbing to reduce speeds.
E | Page 19
STANDARD FORM 330
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Donald A. Shaver
13. ROLE IN THIS CONTRACT
Construction Management
14. YEARS EXPERIENCE
a. TOTAL
37
b. WITH CURRENT FIRM
18
15. FIRM NAME AND LOCATION (City and State)
Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science - Construction Science
Kansas State University, Manhattan, Kansas (1981)
Associate in Technical Education, Building Science,
Hutchinson Community College, Hutchinson, KS (1978)
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
State of Florida General Contractor (Inactive)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
NE/NW 6th Street (Sistrunk Blvd.) Streetscape and Enhancement
Project, Fort Lauderdale, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2012
CONSTRUCTION (If applicable)
2012
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Construction Management services and oversight of Resident Project Representative (RPR) for Sistrunk Blvd.
Streetscape and Enhancement Project. The project was funded and managed by the Fort Lauderdale CRA and
included streetscape improvements, undergrounding of overhead utilities, landscape, median, paver sidewalk,
lighting, drainage and other improvements. Work included close coordination with existing businesses during
construction, public relations to keep all parties informed of improvements, maintenance of traffic coordination to
ensure access to all affected properties throughout construction and a full time RPR on-site managing the project. The
project was federally funded including LAP funding.
b.
(1) TITLE AND LOCATION (City and State)
Miami Gardens Livable Neighborhood Improvements Project
Miami Gardens, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2009 - Present
CONSTRUCTION (If applicable)
Present
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Responsible for Construction Management - The Project includes approximately 222 total acres of land subdivided
among four separate sites; namely Garden Circle, Kings Garden I & II, Kings Garden III and Vista Verde. The various
project sites are all located within the confines of NW 183rd Street (Miami Gardens Drive), NW 215th Street (County
Line Road), NW 47th Avenue, and NW 37th Avenue in the City of Miami Gardens, Florida.
c.
(1) TITLE AND LOCATION (City and State)
Eastside Infrastructure Improvements, Phases 2 & 3
Town of Davie, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2015
CONSTRUCTION (If applicable)
2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Construction Management for 18,940 linear feet of storm sewer, the reconstruction of 5.2 miles of roadway. 14,800
linear feet of 6" diameter main, 5,075 linear feet of 8" diameter main, and 5,,140 linear feet of 12" diameter main,
455 linear feet of 8" diameter sanitary sewer, 40 sanitary manholes and 2,945 linear feet of 16" diameter forcemain.
d.
(1) TITLE AND LOCATION (City and State)
Davie CRA Consulting Services
Davie, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2007 - Present
CONSTRUCTION (If applicable)
Varies
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Mr. Shaver is currently serving as the Craven Thompson & Associates ’ Construction Manager for the Davie CRA
Engineering Consultant Contract. In this role, he has completed numerous Capital Improvement projects including
roadway and drainage improvements; utility rehabilitations; permitting and construction services.
e.
(1) TITLE AND LOCATION (City and State)
South County Neighborhood Improvements
Broward county, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2000
CONSTRUCTION (If applicable)
2006
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Construction Manager. Mr. Shaver was responsible for the construction management of major sections of the South
County Neighborhood Improvement Project. The project consisted of twelve construction packages with a total
construction cost of approximately $70 million dollars. Improvements included water distribution, sanitary sewer, lift
stations, force main, storm water improvements and roadway construction. The project included the design,
permitting, bidding and construction consisting of 53 miles of roadway, 181,000 linear feet of storm sewer (including
exfiltration trench), 140,618 linear feet of water main, 236,226 linear feet of gravity sanitary sewer, and 80 miles of
sidewalk.
E | Page 20
STANDARD FORM 330
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Joseph D. Handley, R.L.A.
13. ROLE IN THIS CONTRACT
Lead Landscape Architect
14. YEARS EXPERIENCE
a. TOTAL
35
b. WITH CURRENT FIRM
30
15. FIRM NAME AND LOCATION (City and State)
Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
16. EDUCATION (DEGREE AND SPECIALIZATION)
Clemson University, B.S. in Ornamental Horticulture
(1980); University of Georgia & Louisiana St. University,
Master in Landscape Architecture Studies (1984)
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Registered Landscape Architect
Florida Registration No. 1368 (1990)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
- American Society of Landscape Architects - CPTED Certification (August 1999)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Bicycle/Pedestrian Greenway & Trails Master Plan
Sunrise, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2014
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Mr. Handley was the CTA Principal-in-Charge for the preparation of the Bicycle / Pedestrian Greenways & Trails
Master Plan. The Plan defines a system of sidewalks, bike lanes, paths, greenways and trails that provides
integrated and continuous corridors for non-motorized transportation and recreation throughout the C ity of
Sunrise in a manner that is sensitive to the needs of various user groups, the natural and built environment,
the management and maintenance, and potential funding capabilities of local government.
b.
(1) TITLE AND LOCATION (City and State)
Miramar Parkway & Miramar Boulevard Median
Enhancements, Miramar, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2017
CONSTRUCTION (If applicable)
2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The project is along Miramar Parkway from the Florida Turnpike to Palm Avenue and along Miramar Boulevard
from University Drive to Palm Avenue. The project includes landscaping and hardscape for two main
thoroughfares through the City of Miramar. The medians lack aesthetic appeal and require various beautification
enhancements. This is Phase I of a multi-phased project. The project requires permitting through the City and
Broward County Construction and Highway Engineering Department.
c.
(1) TITLE AND LOCATION (City and State)
NE 34th Court Complete Streets Project, (from NE 2nd
Avenue to Dixie Highway), Oakland Park, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2012 - 2013
CONSTRUCTION (If applicable)
2013 - 2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Principal Landscape Architect for the landscape, streetscape and irrigation design for the roadway reconstruction
design of approximately 0.60 miles. Estimated Construction Cost: $2.2 Million.
d.
(1) TITLE AND LOCATION (City and State)
North Central County Neighborhood Improvements,
Broward County, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2004
CONSTRUCTION (If applicable)
2012 (Phased)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Principal Landscape Architect Preparation of Basis of Design Report, Contract Documents, Permitting and
Construction Management for 980-acre retrofit infrastructure and landscape improvements within
unincorporated Broward County.
e.
(1) TITLE AND LOCATION (City and State)
Central County Neighborhood Improvements,
Broward County, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
1996
CONSTRUCTION (If applicable)
2006
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Principal Landscape Architect Preparation of Basis of Design Report, Construction Documents, Permitting
and Construction Management for 1,800 acre retrofit infrastructure and landscape improvements within
unincorporated Broward County.
E | Page 21
STANDARD FORM 330
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Richard D. Pryce, P.S.M.
13. ROLE IN THIS CONTRACT
Land Surveying Project Manager
14. YEARS EXPERIENCE
a. TOTAL
46
b. WITH CURRENT FIRM
12
15. FIRM NAME AND LOCATION (City and State)
Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
16. EDUCATION (DEGREE AND SPECIALIZATION)
Associates of Science in Criminal Justice, BCC (1978)
Certificate in advanced GIS & Remote Sensing, BCC (2002)
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Surveyor and Mapper
Florida No. 4038 (1983)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
- Current Director, Broward County Chapter of Florida Surveying Mapping Society, Chairman FSMS GIS Committee
- Geographic Land Information Society, Chairman FSMS Anti-theft Committee, American Congress, Surveying Mapping
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
North County Neighborhood Improvement Project, NE Quadrant
(Surveying)
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2007
CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Lead Surveyor providing surveying of right-of-way for Bid Packages 9, 10, & 11 which included; 152, 213, and 357
acres respectively.
b.
(1) TITLE AND LOCATION (City and State)
North County Neighborhood Improvement Project, NW, Quadrant
(Surveying)
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2011
CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Lead Surveyor providing surveying of right-of-way for the Northwest Quadrant which included 650 acres of land in
Broward County.
c.
(1) TITLE AND LOCATION (City and State)
Garden Acres Neighborhood Improvement Project (Surveying)
Oakland Park, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2012
CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Garden Acres was a single-family residential neighborhood approximately with an area of approximately 24 acres.
This included detailed right-of-way and topographic surveys.
d.
(1) TITLE AND LOCATION (City and State)
City of Miami Gardens General Consulting (Surveying) Services
Miami Gardens, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2009 - Present
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Mr. Pryce has managed all survey activities on our general consulting services for Miami Gardens capital
improvement projects including roadway and drainage improvements; infrastructure improvements; park projects;
street resurfacing; traffic improvement projects; and roadway lighting.
e.
(1) TITLE AND LOCATION (City and State)
North Miami Beach Water and Sewer GIS Project
North Miami Beach, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2015 - 2016
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The purpose of the 25,600-Acre Service Area Project was to provide the City with the complete GIS product of their
water and sanitary system. This involved the conversion of the City’s existing water and sanitary sewer
infrastructure, from an AutoCAD drawing file format to the industry standard, Environmental Systems Research
Institute (ESRI) Geographic Information System (GIS) format. The Project included the entire North Miami Beach
Utility service area.
E | Page 22
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
1
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
LW 2020 Mater Plan - Year 1 Roadway Improvements
Lake Worth, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014 - 2015 2016 (Design & Permit)
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of Lake Worth Mr. Felipe Lofaso
Assistant Director of Public Services
Phone: (561) 586-1720
Email: flofaso@lakeworth.org
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Craven Thompson and Associates was contracted with the City of Lake Worth to design, permit and provide
construction services for Projects 1, 3, 5, 6 & 8 of Year 1 of the Lake Worth 2020 Master Plan.
Project 1 - North M Street and North K Street from 2nd Avenue North to 6th
Avenue North included new watermain and hydrants. North K Street from
2nd Avenue North to 7th Avenue North was in poor condition and required
roadway and sidewalk reconstruction. A small segment at the southern end
of each road fell within Problem Area 8 of the City’s “Stormwater Master
Plan”, and therefore the storm sewer was upgraded.
Project 3 - North F Street from 5th Avenue North to 10th Avenue North
involved the construction of both storm sewer and watermain. No pavement
was identified with a PCI at or below 55 and therefore road reconstruction
was necessary; however, utility trenching necessitated pavement
replacement in trench areas and asphalt overlay.
Project 5 - North M Street from 9th Avenue North to 18th Avenue North
involved the reconstruction of roadway. The existing section of road was
identified as in a failed condition with a PCI less than or equal to 55. The
entire road and base was reconstructed. The majority of the sidewalk also
required reconstruction. The existing storm sewer pipe and structures from
16th Avenue North to 18th Avenue North was evaluated as to the condition
of the materials. From 9th Avenue North to 16th Avenue North storm sewer
was added.
Project 6 - on 11th Avenue North from Dixie Highway to North M Street
involved the reconstruction of roadway and storm sewer. Between North M
Street and North L Street the existing road was rated as being in a failed or
poor condition with a PCI of less than or equal to 55. In these areas the
entire road and base was reconstructed. The structural condition of the
existing storm sewer pipe and structures along the roadway were evaluated. Piping and/or structures identified as in
poor structural condition were replaced.
Project 8 - North J Street from 13th Avenue North to 16th Avenue North, and 15th Avenue North from North J Street to
the railroad tracks, and 14th Avenue North from North J Street to Dixie Highway was identified as a part of Problem
Area 3 in the “Stormwater Master Plan”. This project included the installation of 700 linear feet of 24-inch diameter
exfiltration trench with a nutrient separating baffle box at the end of the trench, the replacement of 950 linear feet of
existing 18 and 24-inch diameter storm sewer with 30-inch diameter RCP storm sewer, and the replacement of 70
linear feet of existing 12-inch diameter storm sewer with 24-inch diameter RCP storm sewer.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson & Associates,
Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime - Surveying, Civil Engineering, Utilities,
Storm Water, Storm Sewer, and Construction
Inspection Services
b.
(1) FIRM NAME
InfraMap Corp.
(2) FIRM LOCATION (City and State)
1860 Old Okeechobee Road
West Palm Beach, Florida 33409
(3) Role
Subconsultant – Subsurface Utility Locates
Existing
Proposed
E | Page 23
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
2
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
North County Neighborhood Improvement Project,
Northeast Quadrant, Bid Package 9, Broward County,
Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2007 2012
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Broward County Water and
Wastewater Services
Mr. Pat MacGregor
Expansion Project Administrator
Phone: (954) 831-0904
Email: pamacgregor@broward.org
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The North County Neighborhood Improvement Project (NCNIP)
Northeast Quadrant, Bid Package 9 includes approximately 152 acres
of land between Dixie Highway and Federal Highway, North of Sample
Road in Pompano Beach. The infrastructure improvements to the
existing neighborhood included new roadways, sidewalks, swale
regrading, drainage, domestic water, sanitary sewer, landscaping, and
signage. The area is generally residential with some commercial
properties built in the 1950’s and early 1960’s. The area was
developed with inadequate sanitary sewer system, no drainage and an
under sized domestic water distribution system. As a result of aging
and inadequate infrastructure, Broward County selected Craven
Thompson and Associates (CTA) to design infrastructure improvements
needed in the area. North County Neighborhood Improvement Project,
Northeast Quadrant, Bid Package 9 included approximately 152 acres
of land between Dixie Highway and Federal Highway, north of Sample
Road. Designed improvements included 38,863 linear feet of roadway,
23,000 linear feet of sidewalk, and 14,000 linear feet of swale, 6,560
linear feet of storm sewer, 8,920 linear feet of exfiltration trench and
two (2) stormwater control structures, a reuse water distribution system
consisting of 22,000 linear feet of 4” diameter, and 1,800 linear feet of
12” diameter main, 57,000 linear feet of domestic water main and 40,000 linear feet of sanitary sewer
collection and transmission systems. CTA provided topographic survey, design, permitting landscape
architecture, and construction engineering and inspection services.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson & Associates,
Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime - Surveying, Civil Engineering,
Landscape Architecture, and Construction
Management
b.
(1) FIRM NAME
InfraMap Corp.
(2) FIRM LOCATION (City and State)
1860 Old Okeechobee Road
West Palm Beach, Florida 33409
(3) Role
Subconsultant - Subsurface Utility Locates
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
E | Page 24
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
3
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
North County Neighborhood Improvement Project, Northeast
Quadrant, Bid Package 10, Broward County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2008 2013
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Broward County Water and
Wastewater Services
Mr. Pat MacGregor
Expansion Project Administrator
Phone: (954) 831-0904
Email: pamacgregor@broward.org
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The infrastructure improvements to the existing
neighborhood included new roadway, sidewalk, swale
regrading, drainage, landscaping, signage, domestic
water, and sanitary sewer. This neighborhood is
approximately 60 years old and the infrastructure had
reached the end of its useful life. The North County
Neighborhood Improvement Project, Northeast
Quadrant, Bid Package 10 included approximately 213
acres of land. The project included 47,520 linear feet
of roadway reconstruction, and 53,460 linear feet of
sidewalk construction. Also included were 15,283
linear feet of swale, 6,508 linear feet of storm sewer,
and 8,074 linear feet of exfiltration trench. Several
traffic calming devices were designed and constructed
as part of this Project. A reuse water distribution
system consisting of 32,900 linear feet was
constructed on Bid Package 10, as well as approximately 4,740 linear feet of water main, 21 water services,
27,755 linear feet of sanitary sewer collection and transmission lines, and 475 laterals. CTA provided
topographic survey, design, permitting landscape architecture, and construction engineering and inspection
services.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson & Associates,
Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime - Civil Engineering, ADA, Milling & Re-
Surfacing, Storm Water & Engineering Studies
b.
(1) FIRM NAME
InfraMap Corp.
(2) FIRM LOCATION (City and State)
1860 Old Okeechobee Road
West Palm Beach, Florida 33409
(3) Role
Subconsultant - Subsurface Utility Locates
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
E | Page 25
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
4
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
Sistrunk Boulevard (NE / NW 6th Street) Streetscape
Enhancement Project, Fort Lauderdale, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2011 2012
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of Fort Lauderdale and
Community Redevelopment Agency
Mr. Mark Friedman, AIA,
NCARB, Project Manager II
Phone: (954) 828-5952
Email: MFriedman@fortlauderdale.gov
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Craven Thompson and Associates represented the City of Fort Lauderdale as the Resid ent Project
Representative for the Sistrunk Boulevard Streetscape and Enhancement Project providing Construction
Engineering and Inspection Services. While the design of this project was managed by the City’s Community
Redevelopment Agency (CRA) the construction portion was administered by the City of Fort Lauderdale’s Public
Works Department. Primary funding for construction was provided by the Fort Lauderdale CRA. The project
area encompasses 2.5 miles of Sistrunk Boulevard (NE/NW 6th Street) from Federal Highway to NW 24th
Avenue and includes streetscape and infrastructure improvements consisting of landscaped medians, paver
sidewalks, decorative street lighting, traffic signal mast arm installations, undergrounding of overhead utilities,
drainage improvements, new water mains and the relocation of various sanitary sewer lines. Work included on-
site resolution of construction conflicts and design changes, construction inspection services for quality control
and project certification, coordination with FPL, AT&T and Comcast for utility conversions from overhead to
underground, close coordination with existing businesses during construction, public relations to keep all
parties informed of the ongoing improvements, maintenance of traffic coordination to e nsure continuous
access to all affected properties, monthly Pay Application reviews, Change Order reviews and various other
construction management duties. This project was partially, federally funded through FDOT LAP funding.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson & Associates,
Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime - Resident Project Representative,
Construction Engineering Inspection,
Surveying, Landscape Architectural Services
b.
(1) FIRM NAME
Masuen Consulting, LLC
(2) FIRM LOCATION (City and State)
32801 Highway 441 N. #293
Okeechobee, Florida 34972
(3) Role
Subconsultant - Landscape Irrigation Design
c.
(1) FIRM NAME
Hillers Electrical Engineering,
Inc.
(2) FIRM LOCATION (City and State)
23257 State Road 7, Suite 100
Boca Raton, Florida 33428
(3) Role
Subconsultant - Electrical Engineering & Lighting
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
E | Page 26
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
5
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
North County Neighborhood Improvement Project, Northeast
Quadrant, Bid Package 11, Broward County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2009 2014
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Broward County Water and
Wastewater Services
Mr. Pat MacGregor, Expansion
Project Administrator
Phone: (954) 831-0904
Email: pamacgregor@broward.org
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The infrastructure improvements to the existing neighborhood
included new roadway, sidewalk drainage, swale regrading,
landscaping, water, sanitary sewer, and signage, Bid Package
11 was the final area in the North County Neighborhood
Improvement, NE Quadrant. The area is primarily residential
that was developed in the 1950’s. The existing infrastructure
was longer suitable to meet the current standards for water
and sanitary sewer facilities. The Project was completed under
budget and on time. The North County Neighborhood
Improvement Project (NCNIP) Northeast Quadrant, Bid Package
11 included approximately 357 acres of land between Dixie
Highway and Federal Highway, north of Sample Road in
Broward County. The project included over 50,688 linear feet
of new roadway construction, sidewalks, driveway aprons, and
sodded swales In addition the project included over 14,777 linear feet of new storm sewer, 12,993 linear feet
of exfiltration trench, 64,000 linear feet of water main, 553 Water Services (many of these services were
moved from the rear of the lot to the front), 49,700 linear feet of reuse water main, 796 reclaime d water
services, 43,805 linear feet of gravity sewer main, 750 sewer laterals, lift station, and 1,630 linear feet of
force main. CTA provided surveying, civil engineering, landscape architecture and CEI services on the project.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson &
Associates, Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime - Surveying, Civil Engineering, Landscape
Architecture, Construction Services
b.
(1) FIRM NAME
InfraMap Corp.
(2) FIRM LOCATION (City and State)
1860 Old Okeechobee Road
West Palm Beach, Florida 33409
(3) Role
Subconsultant - Subsurface Utility Locates
c.
(1) FIRM NAME
Masuen Consulting, LLC
(2) FIRM LOCATION (City and State)
32801 Highway 441 N., #293
Okeechobee, Florida 34972
(3) Role
Subconsultant - Landscape Irrigation Design
E | Page 27
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
6
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
North County Neighborhood Improvement Project, Northwest
Quadrant, Broward County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2011 2014
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
b. POINT OF CONTACT NAME
c. POINT OF CONTACT TELEPHONE NUMBER
Broward County Water and
Wastewater Services
Mr. Alan Garcia, P.E.
Director of Water & Wastewater
Operations Division
Phone: (954) 831-0704
Email: agarcia@broward.org
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Services included engineering studies and design (water, roadway, paving, storm water quality treatment, storm
sewer, and sanitary sewer), surveying, planning and landscape architecture, and Construction Engineering
Inspection Services. The North County Neighborhood Improvement Project, Northwest Quadrant includes land
between Dixie Highway and I-95, North of Sample Road, in the City of Deerfield Beach. This area is primarily
residential, built in the 1950’s and early 1960’s. The area was developed with limited sanitary sewer system, no
drainage and an inadequate and now aged water distribution system. The project which includes approximately
650 acres of land between Dixie Highway and I-95, North of Sample Road, Roadway improvements included
115,596 linear feet of roadway, along with 104,637 linear feet of sidewalk, and storm sewer included 17,006
linear feet of pipe, and there were 33,191 linear feet of exfiltration trench. Additionally, the sanitary sewer
collection system consisted of 70,783 linear feet of gravity main, 14,253 linear feet of force main, and four (4)
lift stations. The water distribution system additions included 86,112 linear feet of watermain and 1,590 water
services CTA provided topographic survey, design, permitting landscape architecture, and construction
engineering and inspection services.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson & Associates,
Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime – Civil Engineering, Landscape
Architecture, Surveying, Construction
Services
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
E | Page 28
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
7
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
Garden Acres Neighborhood Improvements
Oakland Park, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2012 2014
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of Oakland Park Ms. Jennifer Frastai, ICMA-CM, Director of
Engineering & Community Development
Phone: (954) 630-4477
Email: Jenniferf@oaklandparkfl.gov
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Garden Acres was a single-family residential neighborhood approximately with an area of approximately 24
acres. The new drainage system consists of 4” deep roadway swales, drainage pipes and structures, exfiltration
trenches and two controlled discharge points into an existing drainage system located within the NE 6 th Avenue
right-of-way. The roadway swales help with the storage and convey the runoff from the roadway and the house
lots. The swales and exfiltration trenches handle the water quality volume generated by the roadway right -of-
way area. CTA analyzed the system using ICPR software. CTA provided design, permitting and CEI services for
the project. The roadway restoration consisted of 4,985 linear feet of roadway. The drainage system consisted
of 2,136 linear feet of storm sewer, 4,171 linear feet and of exfiltration trench. The project a lso included major
roadway, water and sanitary sewer improvements. The water improvements consisted of 5,591 linear feet of 6”
diameter main, and 962 linear feet of 8” diameter main. The sanitary improvements consisted of 7,045 linear
feet of 8” diameter sewer, 218 linear feet of 4” diameter forcemain, and 1,044 linear feet of 6” diameter
forcemain. Improvements included two lift stations.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson & Associates,
Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime – Civil Engineering Landscape
Architecture, Survey Services, & CEI
Services
b.
(1) FIRM NAME
InfraMap Corp.
(2) FIRM LOCATION (City and State)
1860 Old Okeechobee Road
West Palm Beach, Florida 33409
(3) Role
Subconsultant – Subsurface Utility Locates
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
E | Page 29
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
8
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
Miami Gardens Livable Neighborhood Improvement Project,
Miami Gardens, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2009 - Present 2010 - Present
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of Miami Gardens Mr. Tom Ruiz, Director of Public
Works
Phone: (786) 279-1260
Email: truiz@miamigardens-fl.gov
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Craven Thompson & Associates (CTA) provided all of the surveying services, storm water master planning, all
civil engineering, all landscape architectural, and construction management for the project.
The Livable Neighborhoods Improvement Project is subdivided among four separate sites; namely Garden
Circle, Kings Garden I & II, Kings Garden III and Vista Verde. The various project sites are all located within the
confines of NW 183rd Street (Miami Gardens Drive), NW 215th Street (County Line Road), NW 47th Avenue, and
NW 37th Avenue in the City of Miami Gardens, Florida. No storm water quality treatment or quantity attenuation
facilities were included in the initial developments, which are apparent through the numerous drainage issues
observed. The Livable Neighborhoods Improvement Project includes approximately 222 total acres of land . The
project includes: 34,200 linear feet of roadway, 7,840 linear feet of sidewalk, 19,000 linear feet of storm
sewer, 151 drainage structures, the regrading of 22,500 linear feet of swales, and the addition of 112 street
lights, along with street trees and landscape/hardscape.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson & Associates,
Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime - Civil Engineering, Surveying,
Landscape Architecture, & CEI Services
b.
(1) FIRM NAME
InfraMap Corp.
(2) FIRM LOCATION (City and State)
1860 Old Okeechobee Road
West Palm Beach, Florida 33409
(3) Role
Subconsultant – Subsurface Utility Locates
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
e.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
E | Page 30
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
9
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
Ramblewood Drainage Improvements Project
Greenacres, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2013 2014
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of Greenacres Mr. Carlos I. Cedeño
Public Works Director
Phone: (561) 642-2074
Email: ccedeno@ greenacresfl.gov
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The project was designed and constructed with the goal of improving the drainage system function and
interconnecting missing sidewalks in an existing residential neighborhood. The project required 615 linear
feet of drainage piping, 351 linear feet of exfiltration trench, 1,000 linear feet of sidewalk, and numerous
driveway restorations within the neighborhood road rights of ways. Significant pavement restoration was also
required. The challenges in the project included working around existing water and sewer services to remain
in service while installing significant trench and drainage pipe as well as working to minimize impacts to
residences during construction as much as possible. The design work was completed August 2014 and the
construction was completed December 2014.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson & Associates,
Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime – Civil Engineering, Surveying & CEI
Services
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
e.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
E | Page 31
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
10
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
Utility Analysis Zone Improvement Program (UAZ) 308
Broward County
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2008 2013
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Broward County Water &
Wastewater Services
Mr. Patrick MacGregor
Expansion Project Administrator
Phone: (954) 831-0904
Email: pamacgregor@broward.org
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The UAZ 308 project encompasses approximately 125 acres in the City of Dania Beach and is located south of
Griffin Road, west of Anglers Avenue, east of SW 30th Avenue, and north of SW 53rd Court. The infrastructure
improvements to the existing neighborhood included new water and sanitary sewer systems. This area is
primarily residential, built in the 1950’s and early 1960’s. The area was developed without a sanitary sewer
collection system, inadequate drainage, and an inadequate water distribution system. As a result of inadequate
infrastructure, Broward County selected Craven Thompson and Associates (CTA) to design infrastructure
improvements needed in the area. CTA designed, permitted, and provided constructi on engineering and
inspection services for the construction of over 28,700 linear feet of water main, 219 Water Services, 20,300
linear feet of Gravity sewer main, 340 sewer laterals, and 1,270 linear feet of force main. Main line pipe sizes
ranged from 6” to 10” in diameter. Project also included over 50,000 SY of new roadway construction,
sidewalks, driveway aprons, and re-graded swales. This project required coordination with the City of Dania
Beach and included a lift station located within Meli Park.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson & Associates,
Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime - Surveying, Civil Engineering,
Landscape Architecture and Construction
Services
b.
(1) FIRM NAME
InfraMap Corp.
(2) FIRM LOCATION (City and State)
1860 Old Okeechobee Road
West Palm Beach, Florida 33409
(3) Role
Subconsultant – Subsurface Utility Locates
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
E | Page 32
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
11
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
City of North Miami Beach Water & Sewer GIS Project,
North Miami Beach, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014 - 2016 Not Applicable
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of North Miami Beach Mr. Karim L. Rossy
Utilities Engineering Manager
Phone: (305) 948-2980, ext. 7962
Email: harim.rossy@citynmb.com
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The purpose of the 25,600 Acre Service Area Project is to provide the City with the complete GIS product of their
water and sanitary system. This involved the conversion of the City’s existing water and sanitary sewer
infrastructure, from an AutoCAD drawing file format, to the industry standard, Environmental Systems Research
Institute (ESRI) Geographic Information System (GIS) format. The Project includes the entire North Miami Beach
Utility service area. The process includes conversion of existing AutoCAD files, into the same coordinate system as
the GIS, so that future updates will be more easily transferred between the two systems, for updates and
maintenance. The project involves setting up a GIS Network file structure for the City to insert existing and future
documentation into, as well as, adding GIS database information in the future.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson & Associates, Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime - Surveying, & GIS
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
E | Page 33
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
12
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
Eastside Master Infrastructure Project – Phases 2 & 3
Davie, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2015 - 2016 2017 - 2018
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Town of Davie Mr. Phillip Holste, Assistant Town
Administrator & Interim CRA Director
Phone: (954) 797-1041
Email: phillip_holste@davie-fl.gov
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Craven Thompson & Associates (CTA) performed surveying, subsurface locates, design and permitting for
approximately 340 acres within the CRA, east of Davie Road, north of Orange Drive, south of SW 36 th Court and
west of SW 53rd Avenue. The basic infrastructure work consists of several miles of roadway reconstruction with
landscaping, sidewalks, swale re-grading, storm sewer, watermain, and sanitary sewer.
More specifically it includes 18,940 linear feet of storm sewer, the reconstruction of 5.2 miles of roadway.
14,800 linear feet of 6" diameter main, 5,075 linear feet of 8" diameter main, and 5,140 linear feet of 12"
diameter main, 455 linear feet of 8" diameter sanitary sewer, 40 sanitary manholes and 2,945 linear feet of 16"
diameter forcemain.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson & Associates,
Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime - Surveying, Roadway Design,
Landscape, Permitting, Bidding &
Construction Services
b.
(1) FIRM NAME
InfraMap Corp.
(2) FIRM LOCATION (City and State)
1860 Old Okeechobee Road
West Palm Beach, Florida 33409
(3) Role
Subconsultant – Subsurface Utility Locates
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
e.
(1) FIRM NAME
(2) FIRM LOCATION (City and State) (3) Role
E | Page 34
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
13
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
Original Section Drainage Improvements Project
Greenacres, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014 - 2015 2016 Phase I Complete
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of Greenacres Mr. Carlos I. Cedeño
Public Works Director
Phone: (561) 642-2074
Email: ccedeno@ greenacresfl.gov
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Phase 1 of the project required 4,500 linear feet of drainage pipe, 21,615 linear feet of ditch re-shaping, long
lengths of sidewalk replacement, driveway restorations, and pavement restoration. The Phase 1 project
required installation of 500 linear feet of 36” RCP storm pipe, 1,010 linear feet of 24” RCP Storm Pipe, 156
linear feet of 18” RCP Storm Pipe, 156 linear feet of 12”x18” RCP storm Pipe, significant ditch reshaping,
sidewalk replacement, and replacement of outfall to LWDD canal.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson & Associates,
Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime - Surveying, Civil Engineering, Utilities,
Storm Water, Storm Sewer, and
Construction Inspection Services
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
E | Page 35
STANDARD FORM 330
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
14
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
City of North Miami Beach General Consulting Services
North Miami Beach, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014 - Present Not Applicable
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of North Miami Beach Mr. Karim L. Rossy
Utilities Engineering Manager
Phone: (305) 948-2980, ext. 7962
Email: harim.rossy@citynmb.com
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Craven Thompson & Associates, Inc. has served as a General Civil Engineering Consultant for the City of North
Miami Beach since 2014. In this role, we have completed numerous Capital Improvement projects including
utility GIS; utility rehabilitations; surveying, bidding assistance; permitting and construction engineering and
inspection services.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Craven Thompson & Associates,
Inc.
(2) FIRM LOCATION (City and State)
3563 NW 53rd Street
Fort Lauderdale, Florida 33309
(3) Role
Prime - Surveying, Civil Engineering, Utilities,
Storm Water, Storm Sewer, and
Construction Inspection Services
b.
(1) FIRM NAME
InfraMap Corp.
(2) FIRM LOCATION (City and State)
1860 Old Okeechobee Road
West Palm Beach, Florida 33409
(3) Role
Subconsultant – Subsurface Utility Locates
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
e.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
E | Page 36
STANDARD FORM 330
. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY
PERSONNEL
(From Section E,
Block 12)
27. ROLE IN THIS
CONTRACT
(From Section E,
Block 13)
28. EXAMPLE PROJECTS LISTED IN
(Fill in "Example Projects Key" section below before completing
table. Place "X" under project key number for
participation in same or similar role.)
.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Patrick J. Gibney, P.E. Principal-In-Charge X X X X X X X X X X X X X
Timothy J. Hall, P.E. Project Manager X X X
Matt Cigale, P.E. Civil Engineer X X X X X X X
Douglas Taylor, P.E. Civil Engineer X X X X X
Don Shaver Const. Management X X X X X X X X X X X X
Richard Pryce, P.S.M. Lead Surveyor X X X X X X X X X X X X X X
Joseph D. Handley, R.L.A. Lead Landscape
Architect X X X X X X X
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
1
LW 2020 Mater Plan - Year 1 Roadway, Bicycle
Lanes & Watermain Improvements, Lake Worth,
Florida
8 Miami Gardens Livable Neighborhood Improvement
Project, Miami Gardens, Florida
2
North County Neighborhood Improvement Project,
Northeast Quadrant, Bid Package 9, Broward
County, Florida
9 Ramblewood Drainage Improvements Project,
Greenacres, Florida
3
North County Neighborhood Improvement Project,
Northeast Quadrant, Bid Package 10, Broward
County, Florida
10 Utility Analysis Zone Improvement Program (UAZ) 308
Broward County
4
Sistrunk Boulevard (NE / NW 6th Street)
Streetscape Enhancement Project, Fort
Lauderdale, Florida
11 City of North Miami Beach Water & Sewer GIS Project,
North Miami Beach, Florida
5
North County Neighborhood Improvement Project,
Northeast Quadrant, Bid Package 11, Broward
County, Florida
12 Eastside Master Infrastructure – Phases 2 & 3,
Davie, Florida
6 North County Neighborhood Improvement Project,
Northwest Quadrant, Broward County, Florida 13 Original Section Drainage Improvements,
Greenacres, Florida
7 Garden Acres Neighborhood Improvement Project,
Oakland Park, Florida 14 City of North Miami Beach General Consulting Services,
North Miami Beach, Florida
E | Page 37
STANDARD FORM 330
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED.
Craven Thompson & Associates, Inc. (CTA) has been an industry leader in the South Florida area since our
inception in 1962. With our office located in Broward County, we have established a high-profile presence through
the years with a reputation of excellent service to many varied clients, performing the full range of professional
services. We have worked closely with many governmental agencies to provide services such as roadway design,
landscape architecture, neighborhood improvements, water and wastewater design, GIS/Mapping, surveying,
planning, storm water management, streetscape, complete streets, roadway beautification and construction
management.
CTA has been providing professional services to the Tri-County area since the formation of the firm. CTA has been
involved in the design, permitting, surveying, contract administration and construction management of numerous
infrastructure rehabilitation projects, redevelopment projects and Capital Improvement Projects, including
roadway design, streetscape, traffic calming, roadway beautification, complete streets, the replacement and
upgrade of water and sewer lines, new infrastructure, sewage pump stations, storm water drainage projects, and
waterway projects. Our experience includes the design and construction of parks, roadways and all levels of
stormwater management and drainage and municipal facilities. All of these projects included surveying, studies,
modeling, cost estimating, design drawings, technical specifications and construction management for the
replacement/rehabilitation of existing roadways and infrastructure and the construction of new drainage facilities,
pavement and landscaping.
CTA presents many distinct and unique advantages which will assure timely and cost -effective completion of
projects. These advantages include the following:
• An experienced team: CTA staff has extensive experience with various types of unusual and difficult projects.
• Full service firm: CTA can provide all of the civil engineering, surveying landscape architecture, planning, GIS
and construction management/administrative services needed in-house.
• Project management: Organization lines and responsibilities are clearly defined for each project, ensuring that
the best qualified individual is matched to a particular assignment.
• Familiarity with County & Municipal agencies and engineering practices.
• Continuity: The Resources and staff available at CTA ensure responsive service and continuity throughout all
phases of projects.
I. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts
31. SIGNATURE
32. DATE
September 4, 2018
33. NAME AND TITLE
Patrick J. Gibney, P.E., Vice President, Engineering
E | Page 38
STANDARD FORM 330
ARCHITECT ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any)
18-08-01
PART II - GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME
Craven Thompson & Associates, Inc.
3. YEAR ESTABLISHED
1962
4. DUNS NUMBER
06-362-4910
2b. STREET
3563 NW 53rd Street
5. OWNERSHIP
a. TYPE
Corporation 2c. CITY
Fort Lauderdale
2d. STATE
Florida
2e. ZIP CODE
33309 b. SMALL BUSINESS STATUS
N/A 6a. POINT OF CONTACT NAME AND TITLE
Patrick J. Gibney, P.E., Vice President, Engineering 7. NAME OF FIRM (If block 2a is a branch office)
Same 6b. TELEPHONE NUMBER
(954) 739-6400
6c. E-MAIL ADDRESS
pgibney@craventhompson.com
8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER
Davis & Craven, Inc. / Davis, Craven, Thompson, Inc. 1962 / 1975
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function
Code b. Discipline
c. No. of Employees
a. Profile
Code b. Experience
c. Revenue
Index
Number
(see below)
a.
Profile
Code
b. Experience
c. Revenue
Index
Number
(see below) (1) FIRM (2)
BRANCH
02 Administrative 9 1 A06 Airports; Term. & Hangars 6 L01 Lab.; Med. Research Facilities 3
08 AutoCAD Technicians 2 A08 Animal Facilities 1 L02 Land Surveying 1
12 Civil Engineers 25 4 A11 Auditoriums & Theaters 1 L04 Libraries; Museums; Galleries 2
15 Construction Inspectors 6 B01 Barracks; Dormitories 1 O01 Office Bldgs.; Industrial Parks 5
16 Const. Management 2 B02 Bridges 1 P05 Planning (Comm.,Regional) 1
38 Land Surveying 30 C06 Churches; Chapels 1 P06 Planning (Site, Installation) 2
39 Landscape Architect 5 C10 Commercial Bldg.; Shopping 6 P13 Public Safety Facilities 3
47 Planners; Urban/Regional 1 C11 Community Facilities 4 R03 Railroad; Rapid Transit 3
D07 Dining Halls; Clubs; Rest. 1 R04 Rec. Fac. (Parks, Marinas) 6
E02 Educational Facilities 6 R06 Rehabilitation (Buildings) 2
E09 Environmental Impact Studies 1 R09 Resources Recov.; Recycling 1
E11 Environmental Planning 1 R11 Rivers; Canals; Waterways 2
F02 Field Houses; Gyms; Stadiums 1 S04 Sewage Collection, Treatment 5
G01 Garages; Vehicle Maint. Fac. 4 S07 Solid Wastes; Incin.; Landfill 5
H01 Harbors; Ship Terminal Fac. 7 S10 Surveying; Platting; Mapping 1
H06 High-rise 1 S13 Storm Water Handling & Fac. 6
H07 Hwys.; Streets; Parking Lots 7 T02 Testing and Inspection Serv. 1
H09 Hospital & Medical Facilities 5 T03 Traffic & Trans. Engineer 4
H10 Hotels; Motels 4 T04 Topo. Survey & Mapping 1
H11 Housing (Res.,Apts.,Condo) 7 U02 Urban Renewals; Comm. Dev. 9
I01 Industrial Buildings 5 W01 Warehouses & Depots 1
Other Employees I06 Irrigation; Drainage 3 W02 Water Resources; Hydrology 4
Total 80 5 J01 Judicial & Courtroom Fac. 3 W03 Water Supply; Treatment 4
11. ANNUAL AVERAGE PROFESSIONAL
SERVICES REVENUES OF FIRM FOR LAST 3 YEARS
(Insert revenue index number shown at right)
PROFESSIONAL SERVICES REVENUE INDEX NUMBER
1. Less than $100,000 6. $2 million to less than $5 million
2. $100,000 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work 1 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
b. Non-Federal Work 8 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
c. Total Work 8 5. $1 million to less than $2 million 10. $50 million or greater
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE
b. DATE
September 4, 2018
c. NAME AND TITLE
Patrick J. Gibney, P.E., Vice President, Engineering
E | Page 39
STANDARD FORM 330 (6/2004)
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
James Kappes, P.E.
13. ROLE IN THIS CONTRACT
Project Engineer
14. YEARS EXPERIENCE
a. TOTAL
13
b. WITH CURRENT FIRM
13
15. FIRM NAME AND LOCATION (City and State)
Hillers Electrical Engineering, Boca Raton, FL.
16. EDUCATION (DEGREE AND SPECIALIZATION)
BSEE/2005/Electrical Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FL/#71499
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
James Kappes, P.E. brings to this project over 13 years of electrical design and project management experience on
major air carrier aviation airport runways, taxiways and apron edge lighting systems, in strumentation landing systems,
airfield electrical vaults, water and wastewater facilities, water management pumping stations, lift stations, state -of-the-
art distributed control systems, DOT expressways, interchanges, value engineering, energy audits, cos t estimates,
testing, startups, lighting systems, security systems, fire alarm system, low and medium voltage distribution systems,
normal and stand-by generation, short circuit calculations, fault current calculations, protective device coordination , arc
flash analysis, and power, control, instrumentation for facilities in the U.S. and internationally.
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Opa-Locka Executive Airport Site Improvement Project
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2016
CONSTRUCTION (If applicable)
Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Preformed electrical design services for the Site Improvement Project at Opa-Locka Executive Airport. Project
included demolition of existing site and roadway lighting systems, relocation of existing FP&L overhead distribution
systems, relocation of existing AT&T and Comcast communication systems, new FP&L, AT&T and Comcast
underground ductbank systems, new lift station, and new road lighting systems. Electrical construction cost: $2.6M.
b.
(1) TITLE AND LOCATION (City and State)
PBIA Golfview Infrastructure Phase 1, Palm Beach International
Airport, West Palm Beach, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2013
CONSTRUCTION (If applicable)
2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Designed electrical communication infrastructure for new PBIA Golfview Development, FP&L / AT&T / Comcast /
FiberNet coordination, roadway lighting systems, ductbank and manhole systems, relocation of apron lighting
systems, lift station power and control per PBC standards, FAA coordination, and FDOT design and coordination.
Projected electrical construction cost: $2.16M.
c.
(1) TITLE AND LOCATION (City and State)
City of Miami Beach – Venetian Islands Bid Package C
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2011
CONSTRUCTION (If applicable)
Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Performed electrical design and construction services for 2.5 miles of new roadway lighting for Rivo Alto, Di Lido and
San Marino Islands. Included roadway photometrics, roadway lighting systems, new conduit and conductor systems
and electrical service points. Electrical construction cost: $1.1M.
d.
(1) TITLE AND LOCATION (City and State)
City of Aventura – Biscayne Blvd (US1) Roadway Lighting
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2011
CONSTRUCTION (If applicable)
2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Performed electrical design and construction services for replacement of the 2.5 miles of Biscayne Blvd (US1)
Roadway Lighting System in the City of Aventura. The existing lighting system was comprised of cobra head fixtures
on aluminum light poles that did not fit with the City’s Architectural Scheme. Included roadway photometrics,
roadway lighting systems, new conduit and conductor systems and electrical service points. Electrical construction
cost: $3M.
e.
(1) TITLE AND LOCATION (City and State)
City of Miami Beach – Neighborhood No.1/Biscayne Point
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2008
CONSTRUCTION (If applicable)
2011
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Performed electrical design and construction services for 6 miles of new roadway lighting for Biscayne Point.
Included roadway photometrics, roadway lighting systems, new conduit and conductor systems and electrical service
points. Electrical construction cost: $2.5M.
E | Page 40
STANDARD FORM 330 (6/2004)
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each person)
12. NAME
Amy L. Champagne-Baker, P.E.
13. ROLE IN THIS CONTRACT
Senior Project Engineer
14. YEARS EXPEREINCE
a. TOTAL
21
b. WITH CURRENT FIRM
21
15. FIRM NAME AND LOCATION (City and State)
Hillers Electrical Engineering, Inc, Boca Raton, Florida
16. EDUCATION (Degree and Specialization)
BSEE/1997/Electrical Engineering
17. CURRENT PROFIESSIONAL REGISTRATION (State and Discipline)
Florida Professional Engineer-73735
CT Professional Engineer- #27854
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Proficiency with SKM Power Tools for Windows DAPPER, CAPTOR, Arc Flash and TMS; AutoCAD, LitePRO and various
generator sizing programs.
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Broward County Water and Waste Services – NRWWTP Facility
Improvements Project 9195 Phase III (3) Solids
(2) YEAR COMPLETED:
PROFESSIONAL SERVICES
2016
CONSTRUCTION (if applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
Project Engineer – Design electrical and control distribution systems for four (4) new motor control centers, modifications to six (6)
motor control centers, two (2) new centrifuges, new belt filter presses, new grinder pumps, new subnate recirculation pumps, new
skimmers, various new VFDs located in the Thickener Building, Southern Digester, Northern Digester and Dewatering Building.
Included on-site verifications, reviewing of record documentation, design of new lighting systems, coordination between various
design and construction projects.
b.
(1) TITLE AND LOCATION (City and State)
Broward County Water and Waste Services – NRWWTP Facility
Improvements Project 9195 Phase III (3) Biologicals
(2) YEAR COMPLETED:
PROFESSIONAL SERVICES
2016
CONSTRUCTION (if applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
Project Engineer – Design electrical and control distribution systems for four (4) new motor control centers for four (4) RAS pump
stations, replacement of VFDs for RAS pumps, RAS meter vaults, replacement of WAS pump systems, replacement of Scum
Pump station, replacement of existing electrical equipment and panelboards as well as replacement of all existing conduit and
conductors systems with replacement of lighting systems. Included on-site verifications, reviewing of record documentation, design
of new lighting systems, coordination between various design an d contruction projects.
c.
(1) TITLE AND LOCATION (City and State)
Palm Beach County Department of Airports – Generator System
Replacement, West Palm Beach, FL
(2) YEAR COMPLETED:
PROFESSIONAL SERVICES
2015
CONSTRUCTION (if applicable)
2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
Project Engineer – Designed for replacement of three (3) existing 1 Megawatt 4160V Generators with two (2) new 2 Megawatt
Generators and replacement of associated 4160V Generator Paralleling Switchgear. Included on-site verifications, testing and
calculations, designed all power, control and lighting systems, fire alarm system, 4160V emergency power, temporary generator
systems, and integration with existing Facility Management and Buildin g Automation Systems.
d.
(1) TITLE AND LOCATION (City and State)
Palm Beach County John Prince Memorial Park High Voltage Distribution
Replacement
(2) YEAR COMPLETED:
PROFESSIONAL SERVICES
2015
CONSTRUCTION (if applicable)
2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
Project Engineer – Designed replacement of existing overhead high voltage distribution system to a new underground distribution
system for the existing park. Designed new underground 26KV electrical distribution system with 21-new dual voltage 26kV/13.2 KV
transformers for a future planned transition to a 13.2KV distribution system, reconnected all existing campgrond services, restrooms
and facilities.
e.
(1) TITLE AND LOCATION (City and State)
City of West Palm Beach – 50 Lift Station Short Circuit, Device Coordination &
Arc Flash Analysis
(2) YEAR COMPLETED:
PROFESSIONAL SERVICES
2015
CONSTRUCTION (if applicable)
2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
Project Engineer – Performed a Short Circuit, Device Coordination & Arc Flash Analysis on 50 Lift stations electrical power
distribution systems for compliance with National Electrical Safety Code 2015 (NFPA 70E), National Electrical Code 2008 (NFPA
70) and IEE 1584. Included field visit for documention of the existing electrical systems, created model in SKM Power Systems to
calculate the available short circuit fault currents; identified equipment below that of the associated available fault current; and
performed arc flash evaluation to identify the proper personnel protective clothing for working on live equipment. Implemented
recommendations for protective device settings and installed Arc flash labels on electrical equipment at all locations.
X
X
X
X
X Check if project performed with current firm
Check if project performed with current firm
Check if project performed with current firm
Check if project performed with current firm
Check if project performed with current firm
E | Page 41
STANDARD FORM 330 (6/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
1
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
City of Sunny Isles Beach
Central Island Drainage & Street Improvements
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2008 2009
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of Sunny Isles Mr. Rick Conner, P.E.
City Manager (305) 792-1928
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Hillers Electrical Engineering (HEE) provided design and construction services for replacement of the 3.4
miles of roadway. Design included coordination with FP&L, roadway photometrics, new electrical service
points, new roadway lighting systems, and new conduit and conductor systems.
Project Highlights:
▪ Design of 78 new light poles and fixtures.
▪ Three new electrical service points were coordinated with FP&L.
▪ Locations of light poles were coordinated with the City to avoid undesirable locations.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Hillers Electrical Engineering,
Inc.
(2) FIRM LOCATION (City and State)
23257 State Road 7, Suite 100
Boca Raton, Florida 33428
(3) Role
Subconsultant – Electrical Engineering
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
E | Page 42
STANDARD FORM 330 (6/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
2
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
City of Miami Beach
Neighborhood No. 1 / Biscayne Point
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2008 2011
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of Miami Beach Mr. Jose Perez (305) 673-7071
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Hillers Electrical Engineering (HEE) provided design and construction services for replacement of the 6 miles
of Stillwater, Biscayne Point Island and Biscayne Point Neighborhood in the City of Miami Beach. Design
included coordination with FP&L, roadway photometrics, new electrical service points, new roadway lighting
systems, and new conduit and conductor systems.
Project Highlights:
▪ Removal and replacement of 140 existing light fixtures on existing poles.
▪ Design of 200 new light poles and fixtures.
▪ Seven new electrical service points were coordinated with FP&L.
▪ Locations of light poles were coordinated with the City to avoid undesirable locations.
Total Electrical Cost: $2,500,000.00
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Hillers Electrical Engineering,
Inc.
(2) FIRM LOCATION (City and State)
23257 State Road 7, Suite 100
Boca Raton, Florida 33428
(3) Role
Subconsultant – Electrical Engineering
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
E | Page 43
STANDARD FORM 330 (6/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
3
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
City of Aventura
Biscayne Boulevard (US1) Roadway Lighting
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2011 2016
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of Aventura Mr. Tony Tomei
Capital Projects Manager Phone: (305) 466-8923
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Hillers Electrical Engineering (HEE) provided design and construction services for replacement of the 2.5
miles of Biscayne Blvd (US1) Roadway Lighting System in the City of Aventura. The existing lighting system
was comprised of cobra head fixtures on aluminum light poles that did not fit with the City’s Architectural
Scheme. Total Electrical Cost: $3,000,000.00.
Project Highlights:
▪ Lighting protect was divided into four separate phases and four plan volumes that were bid out
separately.
▪ New lighting system was installed prior to the demolition of the existing lighting system. Operation of
lighting circuits was maintained at all times during construction.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Hillers Electrical Engineering,
Inc.
(2) FIRM LOCATION (City and State)
23257 State Road 7, Suite 100
Boca Raton, Florida 33428
(3) Role
Subconsultant – Electrical Engineering
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
E | Page 44
STANDARD FORM 330 (6/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
4
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
Opa-Locka Executive Airport Site Improvement Project
Opa-Locka Executive Airport
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2016 Ongoing
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Opa Locka Airport AA
Acquisitions, LLC Mr. Jeff Colasanti Phone: (954) 778-1898
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Hillers Electrical Engineering (HEE) provided design services for the Site Improvement Project at Opa -Locka
Executive Airport. Project included demolition of existing site and roadway lighting systems, relocation of
existing FP&L overhead distribution systems, relocation of existing AT&T and Comcast communication
systems, new FP&L, AT&T and Comcast underground ductbank systems, new lift station, and new road
lighting systems.
Project Highlights:
▪ Relocate 1 mile of existing FP&L, AT&T and Comcast overhead distribution systems to facilitate the new
development.
▪ Design 2 miles of new underground FP&L, AT&T and Comcast ductbank systems to support future Hangar
and Terminal developments.
▪ Design 1 mile of new roadway lighting systems per Miami-Dade County and Illuminating Engineering
Society (IES) Standards.
▪ Design new duplex lift station with standby generator per MDWASD Standards.
Total Estimated Electrical Cost: $2,643,000.00
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Hillers Electrical Engineering,
Inc.
(2) FIRM LOCATION (City and State)
23257 State Road 7, Suite 100
Boca Raton, Florida 33428
(3) Role
Subconsultant – Electrical Engineering
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
E | Page 45
STANDARD FORM 330 (6/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
5
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
Palm Beach International Airport
Construct Golfview Infrastructure, Phase I Project
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2013 2018
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Palm Beach County
Department of Airports
Ms. Cynthia Portnoy
Project Manager (561) 471-7411
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Hillers Electrical Engineering (HEE) provided design services for the Construct Golfview Infrastructure, Phase
1 Project at Palm Beach International Airport (PBIA). Project included relocation of existing FP&L
underground and overhead distribution systems, new FP&L distribution systems, relocation of existing AT&T,
Comcast and FP&L Fibernet communication systems, new lift station, and new road lighting systems.
Project Highlights:
▪ Relocate 4200ft of existing FP&L underground ductbank to facilitate the Golfview development.
▪ Relocate 800ft of existing FP&L, AT&T, Comcast and FP&L Fibernet overhead distribution systems to
facilitate new turn lane on Military Trail.
▪ Design 1.5 miles of new underground FP&L ductbanks to repower existing PBIA Airfield Lighting and
Navigational Systems and support future Hangar and Terminal developments.
▪ Design 2.5 miles of AT&T, Comcast, FP&L Fibernet and Airport Communication ductbank systems to
support future Hangar and Terminal developments.
▪ Design 3900ft of new LED roadway lighting systems per Palm Beach County and Illuminatin g Engineering
Society (IES).
▪ Design new duplex lift station per Palm Beach County Standards.
Total Estimated Electrical Cost: $2,160,000.00
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Hillers Electrical Engineering,
Inc.
(2) FIRM LOCATION (City and State)
23257 State Road 7, Suite 100
Boca Raton, Florida 33428
(3) Role
Subconsultant – Electrical Engineering
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
E | Page 46
STANDARD FORM 330 (6/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
6
21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
City of Miami Beach
Venetian Islands, Bid Package C
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2011 Ongoing
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of Miami Beach Mr. Jose Perez (305) 673-7071
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Hillers Electrical Engineering (HEE) provided design and construction services for replacement of the 2.5
miles of Rivo Alto, Di Lido and San Marino Islands in the City of Miami Beach. Design included coordination
with FP&L, roadway photometrics, new electrical service points, new roadway lighting systems, and new
conduit and conductor systems.
Project Highlights:
▪ Drawings were divided into three separate volumes, one for each island.
▪ Six new electrical service points were coordinated with FP&L.
▪ Locations of light poles were coordinated with the City to avoid undesirable locations.
Total Electrical Cost: $1,100,000.00
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Hillers Electrical Engineering,
Inc.
(2) FIRM LOCATION (City and State)
23257 State Road 7, Suite 100
Boca Raton, Florida 33428
(3) Role
Subconsultant – Electrical Engineering
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) Role
E | Page 47
STANDARD FORM 330 (6/2004)
ARCHITECT–ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If Any)
RFQ No. 18-08-01
PART II – GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME
Hillers Electrical Engineering, Inc.
3. YEAR ESTABLISHED
1994
4. DUNS NUMBER
876227059
2b. STREET
23257 State Road 7, Suite 100
5. OWNERSHIP
a. TYPE
Corporation 2c. CITY
Boca Raton
2d. STATE
Florida
2e. ZIP CODE
33428 b. SMALL BUSINESS STATUS
6a. POINT OF CONTACT NAME AND TITLE
Paul Hillers, President
Active
7. NAME OF FIRM (If block 2a is branch office)
6b. TELEPHONE NUMBER
561-451-9165
6c. E-MAIL ADDRESS
phillers@hillersee.com
8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER
NA NA NA
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND
ANNUAL REVENUE FOR LAST 5 YEARS
a. Function
Code b. Discipline
c. No. of Employees a. Profile
Code b. Experience
c. Revenue Index
Number
(see below) (1) FIRM (2) BRANCH
21 Electrical & Instrumentation Design Engineers 9 A05 Airport NAVAIDS, ILS, Lighting, Aircraft Fueling 5
16 Electrical Construction Manager 4 A06 Airport Terminals and Hangars;Freight Handling 5
08 CADD Technician 1 E03 Electrical Studies and Design 4
02 Administrative 1 W03 Water Supply; Treatment and Distribution(Electrical
and instrumentation design 5
Other Employees
Total 15
11. ANNUAL AVERAGE PROFESSIONAL
SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS
(Insert revenue index number shown at right)
PROFESSIONAL SERVICES REVENUE INDEX NUMBER
1. Less than $100,000 6. $2 million to less than $5 million
2. $100,00 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work 1 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
b. Non-Federal Work 6 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
c. Total Work 7 5. $1 million to less than $2 million 10. $50 million or greater
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE
b. DATE
8/29/2018
c. NAME AND TITLE
Paul Hillers, President
E | Page 48
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
LICENSED IN THE STATE OF FLORIDA
The firm of Craven, Thompson & Associates, Inc. is licensed to do business in the State of Florida.
Below are copies of such licenses and Key Personnel’s licenses, along with Certifications and
Corporate Charters.
PROFESSIONAL LICENSES / CERTIFICATIONS / CORPORATE CHARTERS
Craven Thompson & Associates, Inc.
E | Page 49
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
E | Page 50
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
E | Page 51
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
E | Page 52
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
E | Page 53
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
Hillers Electrical Engineering, Inc. – Electrical Engineering & Lighting
E | Page 54
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
KAMM Consulting, Inc. – Mechanical Engineering
E | Page 55
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
InfraMap Corp. – Sub-Surface Utility Locates
E | Page 56
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
Absolute Civil Engineering Solutions, LLC – Geotechnical Engineering & Testing
E | Page 57
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
Masuen Consulting, LLC – Irrigation Design
E | Page 58
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
E | Page 59
S
e
c
t
i
o
n
F
F
i
r
m
R
e
f
e
r
e
n
c
e
s
a
n
d
S
i
m
i
l
a
r
W
o
r
k
C
o
m
p
l
e
t
e
d
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED
COMPANY OVERVIEW
For over fifty-six (56) years Craven Thompson & Associates, Inc. (CTA) has provided
consulting services to several governmental agencies throughout South Florida. Through
our successful track record in providing infrastructure survey, studies, design, permitting
and construction related services, we have maintained relationships with many of those
municipalities, that extend way beyond the last five (5) years.
As a full-service engineering firm, we specialize in providing services for neighborhood
improvement projects. We are intimately familiar with project requirements and working as
an extension of City staff. This includes preparing studies, plans, calculations, and
specifications, permitting, conducting the necessary public meetings and hearings, bidding
projects, coordination with private property owners, inspecting construction, providing
contract administration services, and final certification of the project.
The emphasis for undergrounding projects is strong project management. Although
thorough research and due diligence of existing site-specific conditions is required, equally
important is the disseminated and coordinated of the information among the many
stakeholders and designers. It is critical that the firm orchestrating this project be able to
show proven success in delivering large neighborhood improvement projects while meeting
clients’ expectations.
The following references come from government agencies we have worked with within the
past 5 years. We’re sure you will find favorable recommendations both about the product
delivered and level of service provided from each.
F | Page 1
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED
REFERENCES
Reference No. 1
a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address:
Mr. Hal G. Barnes, P.E.
Assistant to the City Manager.
City of Fort Lauderdale
Office of Neighbor Support
100 N. Andrews Avenue
Fort Lauderdale, Florida 33301
Phone: (954) 828-5065 / Fax: (954) 828-5074
Email: HBarnes@fourtlauderdale.gov
b. Project Title:
Neighborhood Utility Undergrounding
c. Description of Work performed, including the project location:
This project does not reflect firm experience, but the experience of CTA’s project
manager, Tim Hall. The description is of Tim’s experience with a previous employer.
The project involved building a program to facilitate underground for roughly 840 homes
within 4 separate private neighborhoods. Without the precedence of other projects,
this program needed to be built from scratch. Working closely with City Staff, Tim Hall
helped identify the means and methods to implement as well as manage, coordinate,
and organize action plans.
d. Year Completed:
Tim Hall started this project before 2011 and worked on it through 2015, when he left
the firm for employment at CTA.
F | Page 2
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED
Reference No. 2
a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address:
Mr. Karim L. Rossy
Utilities Engineering Manager
City of North Miami Beach
17050 NE 19th Avenue
North Miami Beach, Florida 33162
Phone: (305) 948-2980, Ext. 7962 / Fax: (305) 957-3501
Email: karim.rossy@citynmb.com
b. Project Title:
City of North Miami Beach, General Engineering Services
c. Description of Work performed, including the project location:
Services include survey, compiling a GIS database of City infrastructure, and
design/permitting of specific infrastructure improvements throughout the City.
Experience includes collection of as-builts and design data for existing systems and
compiling into a cohesive source for information. Demonstrates project management
capabilities for multiple projects.
d. Year Completed:
CTA’s initial involvement with GIS services goes back to 2014. Design services for
infrastructure projects are currently ongoing.
F | Page 3
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED
Reference No. 3
a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address:
Mr. Patrick MacGregor
Expansion Coordinator
Broward County Water and Wastewater Services
2555 West Copans Road
Pompano Beach, Florida 33069
Phone: (954) 831-0904 / Fax: (954) 831-0798
Email: pamacgregor@broward.org
b. Project Title:
North County Neighborhood Improvement Project, Northeast Quadrant, Bid Package
11, Pompano Beach, Florida
c. Description of Work performed, including the project location:
The infrastructure improvements to the existing neighborhood included new roadway,
sidewalk drainage, swale regrading, landscaping, water, sanitary sewer, and signage,
Bid Package 11 was the final area in the North County Neighborhood Improvement, NE
Quadrant. The area is primarily residential that was developed in the 1950’s. The
existing infrastructure was longer suitable to meet the current standards for water and
sanitary sewer facilities. The Project was completed under budget and on time. The
North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid
Package 11 included approximately 357 acres of land between Dixie Highway and
Federal Highway, north of Sample Road in Broward County. The project included over
50,688 linear feet of new roadway construction, sidewalks, driveway aprons, and
sodded swales In addition the project included over 14,777 linear feet of new storm
sewer, 12,993 linear feet of exfiltration trench, 64,000 linear feet of water main, 553
Water Services (many of these services were moved from the rear of the lot to the
front), 49,700 linear feet of reuse water main, 796 reclaimed water services, 43,805
linear feet of gravity sewer main, 750 sewer laterals, lift station, and 1,630 linear feet
of force main. CTA provided surveying, civil engineering, landscape architecture and CEI
services on the project.
d. Year Completed:
2014
F | Page 4
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED
Reference No. 4
a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address:
Mr. Tom Ruiz, Director of Public Works
City of Miami Gardens
1050 NW 163rd Drive
Miami Gardens, Florida 33169
Phone: (786) 279-1260 / Fax: (305) 622-8032
Email: truiz@miamigardens-fl.gov
b. Project Title:
City of Miami Gardens Livable Neighborhood Project, Miami Gardens, Florida
c. Description of Work performed, including the project location:
The Livable Neighborhoods Improvement Project is subdivided among four separate
sites; namely Garden Circle, Kings Garden I & II, Kings Garden III and Vista Verde. The
various project sites are all located within the confines of NW 183rd Street (Miami
Gardens Drive), NW 215th Street (County Line Road), NW 47th Avenue, and NW 37th
Avenue in the City of Miami Gardens, Florida. No storm water quality treatment or
quantity attenuation facilities were included in the initial developments, which are
apparent through the numerous drainage issues observed. The Livable Neighborhoods
Improvement Project includes approximately 222 total acres of land. The project
includes: 34,200 linear feet of roadway, 7,840 linear feet of sidewalk, 19,000 linear
feet of storm sewer, 151 drainage structures, the regrading of 22,500 linear feet of
swales, and the addition of 112 street lights, along with street trees and
landscape/hardscape.
d. Year Completed:
Ongoing
F | Page 5
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED
Reference No. 5
a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address:
Ms. Jennifer Frastai, ICMA-CM
Director of Engineering & Community Development
City of Oakland Park
5399 N. Dixie Highway, Suite 3
Oakland Park, Florida 33334
Phone: (954) 630-4477 / Fax: (954) 229-0487
Email: jenniferf@oaklandparkfl.gov
b. Project Title:
Garden Acres Neighborhood Improvements, Oakland Park, Florida
c. Description of Work performed, including the project location:
Garden Acres was a single-family residential neighborhood approximately with an area
of approximately 24 acres. The new drainage system consists of 4” deep roadway
swales, drainage pipes and structures, exfiltration trenches and two controlled
discharge points into an existing drainage system located within the NE 6th Avenue
right-of-way. The roadway swales help with the storage and convey the runoff from the
roadway and the house lots. The swales and exfiltration trenches handle the water
quality volume generated by the roadway right-of-way area. CTA analyzed the system
using ICPR software. CTA provided design, permitting and CEI services for the project.
The roadway restoration consisted of 4,985 linear feet of roadway. The drainage
system consisted of 2,136 linear feet of storm sewer, 4,171 linear feet and of
exfiltration trench. The project also included major roadway, water and sanitary sewer
improvements. The water improvements consisted of 5,591 linear feet of 6” diameter
main, and 962 linear feet of 8” diameter main. The sanitary improvements consisted of
7,045 linear feet of 8” diameter sewer, 218 linear feet of 4” d iameter forcemain, and
1,044 linear feet of 6” diameter forcemain. Improvements included two lift stations.
d. Year Completed:
2014
F | Page 6
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED
Reference No. 6
a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address:
Mr. Alan Garcia, P.E.
Director of Water & Wastewater Operations Division
Broward County Water & Wastewater Services
2555 West Copans Road
Pompano Beach, Florida 33069
Phone: (954) 831-0747 / Fax: (954) 831-0798
Email: agarcia@broward.org
b. Project Title:
North County Neighborhood Improvement, NW Quadrant, Broward County
c. Description of Work performed, including the project location:
The North County Neighborhood Improvement Project, Northwest Quadrant includes
land between Dixie Highway and I-95, North of Sample Road, in the City of Deerfield
Beach. This area is primarily residential, built in the 1950’s and early 1960’s. The area
was developed with limited sanitary sewer system, no drainage and an inadequate and
now aged water distribution system. project which includes approximately 650 acres of
land between Dixie Highway and I-95, North of Sample Road, Roadway improvements
included 115,596 linear feet of roadway, along with 104,637 linear feet of sidewalk,
and storm sewer included 17,006 linear feet of pipe, and there were 33,191 linear feet
of exfiltration trench. Additionally, the sanitary sewer collection system consisted of
70,783 linear feet of gravity main, 14,253 linear feet of force main, and four (4) lift
stations. The water distribution system additions included 86,112 linear feet of
watermain and 1,590 water services CTA provided topographic survey, design,
permitting landscape architecture, and construction engineering and inspection
services.
d. Year Completed:
2014
F | Page 7
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED
ORGANIZATIONAL CHART
PROJECT MANAGER
Tim J. Hall, P.E.
LEAD LANDSCAPE ARCHITECT
Joseph D. Handley R.L.A.
CONSTRUCTION
MANAGEMENT/ADMINISTRATION
Don Shaver
LEAD SURVEYOR
Richard D. Pryce, P.S.M.
IRRIGATION DESIGN
Judy Jensen
GEOTECHNICAL ENGINEERING
& TESTING
Wayne Webb, P.E.
ELECTRICAL ENGINEERING &
LIGHTING
James Kappes, P.E.
Amy Champagne-Baker, P.E.
PRINCIPAL-IN-CHARGE
Patrick J. Gibney, P.E.
CIVIL ENGINEERING
Douglas Taylor, P.E.
Matthew Cigale, P.E.
MECHANICAL
ENGINEERING
Art Kamm, P.E., CxA, LEED AP
Mircia Pella, P.E., LEED AP
SUB-SURFACE UTILITY
LOCATES
Andres Garcia, ULM
F
|
P
a
g
e
8
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Patrick J. Gibney, P.E.
PROJECT ROLE | Principal-In-Charge
EDUCATION Bachelor of Science - Civil Engineering
Rutgers, The State University 1987
REGISTRATIONS Professional Civil Engineer - Florida No. 49428 (1995)
CERTIFICATIONS FDOT Pre-Qualified Roadway Construction Engineering Inspection
YEARS OF EXPERIENCE 24 Years w/CTA 6 Years w/Other Firms
AREAS OF EXPERTISE Civil Engineering
SUMMARY OF EXPERIENCE
Mr. Gibney has over thirty years of experience providing project management,
design and construction management services for public civil engineering
projects. These services include infrastructure improvements for a multitude of
infrastructure rehabilitation projects. This includes pavement design, design of
water distribution systems, sanitary sewer collection & transmission systems,
storm water management systems, drainage systems, preparation of contract
documents and specifications and construction inspections.
WORK HISTORY
Craven Thompson & Associates, Inc., Fort Lauderdale, Florida
January 2014 to Present | Vice President, Engineering
April 1993 to January 2014 | Senior Supervising Engineer
RELEVANT PROJECT EXPERIENCE
North County Neighborhood Improvement Project, NE Quadrant, Bid Package 9 | Broward County, Florida
| Project Manager. The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant,
Bid Package 9 included approximately 152 acres of land between Dixie Highway and Federal Highway,
north of Sample Road. Designed improvements included 38,863 linear feet of roadway, 23,000 linear
feet of sidewalk, and 14,000 linear feet of swale, 6,560 linear feet of storm sewer, 8,920 linear feet of
exfiltration trench and two (2) stormwater control structures, a reuse water distributi on system consisting
of 22,000 linear feet of 4” diameter, and 1,800 linear feet of 12” diameter main, 57,000 linear feet of
domestic water main and 40,000 linear feet of sanitary sewer collection and transmission systems.
North County Neighborhood Improvement Projects, NE Quadrant Bid, Package 10 | Broward County,
Florida | Project Manager. The North County Neighborhood Improvement Project (NCNIP) Northeast
Quadrant, Bid Package 10 included approximately 213 acres of land. The project included 47,520
linear feet of roadway reconstruction, and 53,460 linear feet of sidewalk construction. Also included
were 15,283 linear feet of swale, 6,508 linear feet of storm sewer, and 8,074 linear feet of
exfiltration trench. Several traffic calming devices were designed and constructed as part of this
Project. A reuse water distribution system consisting of 32,900 linear feet was constructed on Bid
Package 10, as well as approximately 4,740 linear feet of water main, 21 water services, 27,755
linear feet of sanitary sewer collection and transmission lines, and 475 laterals.
North Central County Neighborhood Improvements Project | Broward County, Florida | Project Manager
Managed the design and permitting of the storm water treatment facilities, storm sewer systems, the
water distribution systems, the sanitary sewer systems and the roadway modifications for the entire 980
acres. Preparation of Basis of Design Report, Contract Document s, Permitting and Construction
Management for 980-acre retrofit infrastructure improvements within unincorporated Broward County.
This consisted of approximately 21 miles of roadway, 28,359 linear feet of sanitary lines, 21,308 linear
feet of watermain, and 17.5 miles of sidewalk.
F | Page 9
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Patrick J. Gibney, P.E.
PROJECT ROLE | Principal-In-Charge
Central County Neighborhood Improvements Project | Broward County, Florida | Project Manager
Preparation of Basis of Design Report, Construction Documents, Permitting and Construction
Management for 1,800 acre retrofit infrastructure improvements within unincorporated Broward County.
Managed the study of the water distribution system, sanitary sewer system, and roadway networks
within the project area. Prepared a Basis of Design Report (BODR), which identified major deficienci es
and provided recommendations for improvements. Additional recommendations included construction
of improvements to the water distribution system, intended to provide adequate service for firefighting
capabilities, improvement of the sanitary sewer system intended to eliminate infiltration of groundwater
into the system and thereby reduces system operating costs, and the installation of a sanitary sewer
system in the existing un-sewered areas of the neighborhoods.
Town of Davie - Eastside Drainage Infrastructure Improvements, Phases I thru III | Davie, Florida |
Project Manager. This construction provides drainage infrastructure for the development of a portion of
the Downtown Master Plan Area as well the redevelopment of SW 41st Court. The basic infrastructure
work consists of replacement of the existing water distribution system and new installation of sanitary
sewer system and storm drainage system. The work also includes several miles of roadway
reconstruction with landscaping and sidewalks. The water distribution was designed and permitted by
CTA, included 14,800 linear feet of 6" diameter main, 5,075 linear feet of 8" diameter main, and 5,140
linear feet of 12" diameter main. The sanitary improvements included 11,455 linear feet of 8" diameter
pipe, 40 sanitary manholes and 2,945 linear feet of 16" diameter forcemain. The project also included
18,940 linear feet of storm sewer and the reconstruction of 5.2 miles of roadway.
Miami Gardens Livable Neighborhoods Improvement Project | Miami Gardens, Florida | Project
Manager. The Livable Neighborhoods Improvement Project includes approximately 222 total acres of
land subdivided among four separate sites; namely Garden Circle, Kings Garden I & II, Kings Garden
III and Vista Verde. The project includes: 34,200 linear feet of roadway, 7,840 linear feet of
sidewalk, 19,000 linear feet of storm sewer, 151 drainage structures, the regrading of 22,500
linear feet of swales, and the addition of 112 street lights, along with street trees and
landscape/hardscape. The project began in 2009 and is continuing at present. Four phases are
complete.
Utility Analysis Zone Improvement Program (UAZ) 308 | Broward County, Florida | Project Manager
Mr. Gibney was responsible for the management of the civil engineering design and permitting of a
sanitary sewer collection system consisting of 19,253 linear feet - 8” gravity main. The sanitary force
main system consisted of 1,215 linear feet - 6” main. The water distribution system additions included
18,281 linear feet - 6” main, and 575 linear feet - 8” main.
South County Neighborhood Improvement Project | Broward County | Civil Engineer
Assisted with design, permitting and construction management for 1,400 acre retrofit infrastructure
improvements within unincorporated Broward County. The design and permitting included the following
improvements: water distribution, new sanitary sewer, roadway design, storm water quality treatment,
storm water attenuation, new storm sewer, landscaping, signage, and sidewalk systems. The project
included the design, permitting, bidding and construction consisting of 53 miles of roadway, 181,000
linear feet of storm sewer (including exfiltration trench), 140,618 linear feet of water main, 236,226
linear feet of gravity sanitary sewer, and 80 miles of sidewalk.
F | Page 10
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Timothy Hall, P.E.
PROJECT ROLE | Project Manager
EDUCATION Bachelor of Science - Civil Engineering
University of Maryland (Structural Emphasis) | 1987
REGISTRATIONS Professional Civil Engineer - Florida No. 50588 | 1996
AREAS OF EXPERTISE Civil Engineering
YEARS OF EXPERIENCE 11 Years w/CTA - 30 Years Total
SUMMARY OF EXPERIENCE
With over 30 years of experience, 23 years within South Florida, Mr. Hall has an
extensive and diverse project history. His experience includes modeling, master
planning, preparation of construction documents, permitting, and construction
administration for numerous water distribution, sewer collection, storm water
management, and land development projects. Having participated in the design
and implementation of everything from small in-fill development to large
neighborhood improvements. He has been exposed to a wide range of private
land development and public infrastructure projects. Tim’s project management
skills and ability to align client needs with jurisdictional requirements is enhanced
by his years of experience and variety of projects.
WORK HISTORY
Craven Thompson & Associates, Inc., Fort Lauderdale, Florida
June 2015 to Present | July 1995 to Sept. 2003 | Senior Supervising Engineer
Keith and Schnars, Fort Lauderdale, Florida
September 2003 - June 2015 | Vice President, Civil Engineering
City of Rockville, Rockville, Maryland
September 1993 - June 1995 | Civil Engineer
RELEVANT EXPERIENCE
City of Sunny Isles Beach, Utility Undergrounding, Sunny Isles Beach, Florida
Project lead for the City of Sunny Isles Beach undergrounding efforts. Project include d undergrounding of
overhead electrical, telephone, and cable within 2.1 miles along Collins Avenue (A1A). Significant
coordination required between FP&L, low voltage utilities and FDOT requirements. Understanding of
technical requirements and restrictions of both FDOT and utilities required to deal with the physical
limitations of constructing within the right-of-way.
City of Fort Lauderdale, Undergrounding of Utilities Continuing Services, Fort Lauderdale, Florida
In 2009, the City awarded the general services contract to assist in facilitating the undergrounding of
utilities within neighborhood through special assessment. Projects required a clear roadmap of
procedure, ability to communicate effectively with residents, coordination of utilities, understanding of
FP&L tariff and requirements thereof, assistance in drafting proper ordinance, cost estimates, and
understanding of special assessment procedures and requirements.
City of North Miami Beach, General Consulting Services, North Miami Beach, Florida
Craven Thompson & Associates, Inc. has served as a General Civil Engineering Consultant for the City of
North Miami Beach since 2014. In this role, we have completed numerous Capital Improvement projects
including utility GIS; utility rehabilitations; surveying, bidding assistance; permitting and construction
engineering and inspection services.
F | Page 11
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Timothy Hall, P.E.
PROJECT ROLE | Project Manager
City of Fort Lauderdale - General Engineering Services Contract
Project Coordinator and point of contact for engineering, landscape, survey, and architectural services
provided to the City through open-ended contract. In addition to management of multiple projects,
responsible for overseeing design, commitment to schedule and meeting budgets for multi-facetted
improvement projects. Projects include programs to provide water and wastewater improvements to
existing neighborhoods served by septic systems and without adequate fire protection. Areas served
include a mixture of single family, multi-family, commercial, office and industrial uses. In addition to
utilities, improvements included streetscape, landscape, drainage, roadway re-alignment and traffic
calming.
Broward County Neighborhood Improvement Projects, Broward County - Four individual neighborhood
improvement projects ranging from 900 to 1600 acres each. Prepare models to identify areas of
inadequate fire protection, sewer collection, and drainage. Utilize models to design upgrades to water,
force main, lift stations, and drainage. Improvements include re-grading of roadways and landscaping.
Traffic Calming at the Intersections of 123rd Street & NW 1st Court, 123rd Street & Miami Court, NW 139th
Terrace & NW 5th Court | North Miami, Florida | Project Lead - The project involved the development of
designs for traffic calming features along NW 123th Street and NW 1st Court, NW 123rd Street and NW
Miami Court, and 139th Street NW 5th Court in the City of North Miami. These intersections had large of
expanses of pavement without traffic control and therefore required the impleme ntation of traffic calming
features. CTA design elevated intersections, removed pavement and introduced curbing to reduce
speeds.
Government Center Commercial Alleyways 2” Watermain Replacement | North Miami Beach, Florida |
Project Manager - As with many eastern Miami-Dade municipalities, North Miami Beach has an aging and
undersized water distribution system. The City has embarked on a program to install & upgrade new
watermain at various locations within their services area. The City hired Craven Thompson & Associates, Inc.
to survey, design, permit and provide construction engineering and inspection services for the upgraded
Government Center system including: 4,830 linear feet of 4” dia. main, 67 water services, and 12 gate valves
along with 2,800 SY of pavement restoration.
Honey Hill Water System Betterment | North Miami Beach, Florida | Project Manager - As with many
eastern Miami-Dade municipalities, North Miami Beach has an aging and undersized water distribution
system. The City has embarked on a program to install & Upgrade new watermain at various locations within
their services area. The City hired Craven Thompson & Associates, Inc. to survey, design, permit and provide
construction engineering and inspection services for the upgraded Government Center system including:
4,830 LF of 4” dia. main, 67 water services, and 12 gate valves along with 2,800 SY of pavement restoration
City of Fort Lauderdale - WW2011 Program, Fort Lauderdale, Florida
Project Lead for design services related to City’s Capital Improvements Program which included
approximately $636 million in utilities infrastructure repair, replacement, and upgrades. The program
includes analysis, modeling and design for improvements to water and wastewater facilities in meeting a
comprehensive plan in response to expanded demand and service areas.
Port Everglades Utilities Analysis, Broward County, Florida
Collect data and create model for use in analyzing network of public lift -stations and force mains. Model
utilized for analysis of existing capacities as well as adaptability of individual lift stations and force mains
for future expansion. Compiled list of alternatives for remediation of inadequate service levels and
proposed recommendations for short term and long-term solutions based upon performance, cost, and
constructability.
F | Page 12
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Matthew Cigale, P.E.
PROJECT ROLE | Civil Engineer
EDUCATION Bachelor of Science in Civil Engineering
Clarkson University | Potsdam, New York | 1996
REGISTRATIONS Professional Engineer – Florida No. 74584 - 2012
YEARS OF EXPERIENCE 18 Years w/CTA - 20 Years Total
AREAS OF EXPERTISE Civil Engineering
SUMMARY OF EXPERIENCE
Mr. Cigale's extensive knowledge includes site plan layout, roadway design, water
distribution system design, wastewater collection & transmission system design,
storm water management design, planning and calculations, project
management, cost estimation, construction permitting, and construction
management.
WORK HISTORY
Craven Thompson & Associates, Inc., Fort Lauderdale, Florida
November 1999 to Present | Senior Supervising Engineer
Paramount Engineering Group, Inc., Boca Raton, Florida
October 1997 to November 1999 | Project Manager
RELEVANT PROJECT EXPERIENCE
Washington Road Basis of Design Review (BODR) | City of West Palm Beach, Florida | Project Manager
Mr. Cigale managed the development of the BODR for the study area, totaling approximately three (3)
acres, located within a historical single family residential neighborhood of West Palm Beach. Many of
the existing utility systems are inadequate, aging and in need of improvement. The improvements
analyzed included: water distribution, wastewater, stormwater/drainage, roadway reconstruction,
sidewalk, ADA issues, pavement marking & signage, and landscaping.
LW 2020 Year 1 Mater Plan, Lake Worth, Florida - Project Engineer
▪ Project 1 - North K Street and North M Street from 2nd Avenue North to 9th Avenue North. An 8-inch
diameter watermain constructed on each street connecting to the existing 12-inch diameter PVC
main running east-west along 2nd Avenue North, and to the 8-inch diameter main running east-west
along 9th Avenue North. The existing north-south watermains were 2, 4, and 6-inch diameter cast
iron and 2-inch diameter galvanized steel lines in the alleys between the streets. Along with the
installation of the mains, the water meters at the property lines were relocated to the streets as
opposed to the alleys. Hydrants were added in the vicinity of 8th Avenue N, 4th Avenue North, and 3rd
Avenue North. Existing hydrants between the streets that were in poor condition were replaced.
North K Street from 2nd Avenue North to 7th Avenue N was in poor condition and required roadway
and sidewalk reconstruction. A small segment at the southern end of each road fell within Problem
Area 8 of the City’s “Stormwater Master Plan”, and therefore the storm sewer was upgraded.
▪ Project 3 - N F Street from 5th Avenue N to 10th Avenue N involved the construction of both storm
sewer and watermain. Flood staging did not meet the minimum City criteria for the 5-year, 24-hour
event. Therefore, reconstruction of the storm sewer was required and wa ter quantity attenuation
with exfiltration trench was implemented. To the north we connected a 12-inch diameter main to the
existing 12-inch diameter stub extending south from 10th Avenue N within the road right-of-way and
to the south tie into the 8-inch diameter main running east-west along 5th Avenue North. The only
existing north-south watermain were 6-inch diameter cast iron mains located in both alleyways
immediately east and west of North F Street. The meters were relocated within the road right-of-way
F | Page 13
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Matthew Cigale, P.E.
PROJECT ROLE | Civil Engineer
and two new fire hydrants were constructed with this project. No pavement was identified with a PCI
at or below 55 and therefore road reconstruction was necessary; however, utility trenching
necessitated pavement replacement in trench areas and asphalt overlay.
▪ Project 5 - North M Street from 9th Avenue North to 18th Avenue North involved the reconstruction of
roadway. The existing section of road was identified as in a failed condition with a PCI less than or
equal to 55. The entire road and base was reconstructed. The majority of the sidewalk also required
reconstruction. The existing storm sewer pipe and structures from 16th Avenue North to 18th Avenue
North was evaluated as to the condition of the materials. From 9th Avenue North to 16th Avenue
North storm sewer was added.
▪ Project 6 - on 11th Avenue North from Dixie Highway to North M Street involved the reconstruction of
roadway and storm sewer. Between North M Street and North L Street the existing road was rated as
being in a failed or poor condition with a PCI of less than or equal to 55. In these areas the entire
road and base was reconstructed. The structural condition of the existing storm sewer pipe and
structures along the roadway were evaluated. Piping and/or structures identified as in poor
structural condition were replaced.
▪ Project 8 - North J Street from 13th Avenue North to 16th Avenue North, and 15th Avenue North from
North J Street to the railroad tracks, and 14th Avenue North from North J Street to Dixie Highway was
identified as a part of Problem Area 3 in the “Stormwater Master Plan”. This project included the
installation of 700 linear feet of 24-inch diameter exfiltration trench with a nutrient separating baffle
box at the end of the trench, the replacement of 950 linear feet of existing 18 and 24-inch diameter
storm sewer with 30-inch diameter RCP storm sewer, and the replacement of 70 linear feet of
existing 12-inch diameter storm sewer with 24-inch diameter RCP storm sewer.
North County Neighborhood Improvements Project, Northeast Quadrant | Broward County | Project
Engineer – Mr. Cigale assisted in the design and permitting of water distribution and sanitary sewer
improvements for the infrastructure rehabilitation project. This included a sanitary sewer collection
system consisting of 69,550 linear feet - 8” gravity main, 807 linear feet - 10” gravity main, 129 linear
feet - 12” gravity main, and 144 linear feet - 16” gravity main. The sanitary force main system consisted
of 540 linear feet - 8” main, and 1,540 linear feet 12” main. The water distribution system additions
included 35,626 linear feet - 6” main, 10,161 linear feet - 8” main, 841 linear feet - 12” main, 1,306
linear feet - 20” main, and 1,023 linear feet - 24” main, totaling 9.27 miles of water main.
North County Neighborhood Improvement Project, Northwest Quadrant | Broward County | Project
Engineer - Mr. Cigale was responsible for design and permitting for the water distribution, san itary sewer
collection systems, storm sewer systems, and roadway improvements.. The sanitary sewer collection
system consisted of 22,047 linear feet - 8” gravity main, and 34 linear feet - 10” gravity main. The
sanitary force main system consisted of 295 linear feet - 8” main, 2,235 linear feet - 10” main, 3,790
linear feet - 12” main, 4,300 linear feet - 16” main, and 4,205 linear feet - 20” main. There were ninety
three (93) new sanitary manholes added to the area. The water distribution system additions included
5,760 linear feet - 16”water main, 7,156 linear feet - 12” water main, 1,256 linear feet - 10” water
main, 12,779 linear feet - 8” water main and 44,217 linear feet - 6” water main.
Garden Acres Neighborhood Improvements | Oakland Park, Florida |Project Manager
Responsible for preparation of Contract Documents, Permitting and Construction Management for 25-
acre residential infrastructure improvement(s) retrofit within the City of Oakland Park. Services include:
roadway design; storm water design; water distribution system design; wastewater collection &
transmission systems design; permitting; bidding assistance and construction administration.
F | Page 14
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Douglas R. Taylor, P.E.
PROJECT ROLE | Civil Engineer
EDUCATION Bachelor of Science - Civil Engineering
University of Illinois | 1984
REGISTRATIONS Professional Civil Engineer - Florida No. 50569 (1996)
CERTIFICATIONS
FEMA ICS-100 Certification, FEMA ICS-200 Certification
TS EM5 Intermediate ICS (G300) Certification, FEMA G400 Intermediate
FEMA ICS-700 Certification, FEMA ICS-800 Certification
AREAS OF EXPERTISE Civil Engineering
YEARS OF EXPERIENCE 7 Years w/CTA – 34 Years Total
SUMMARY OF EXPERIENCE
Mr. Taylor has been responsible for a multitude of municipal engineering and
development projects throughout Florida. This includes project management,
master design responsibility and oversight for a variety of projects. Mr. Taylor has
34 years of experience in civil engineering and is a registered Professional
Engineer in Florida, Colorado, Illinois, Iowa and Wisconsin. This experience
includes 17 years of project management, design and permitting for
redevelopment projects in South Florida.
WORK HISTORY
Craven Thompson & Associates, Inc., Fort Lauderdale, Florida
March 2013 to Present | 1996 to 1998 | Director of Municipal Services,
Business Development
RELEVANT EXPERIENCE
Miami Gardens Livable Neighborhoods Improvement Project. The Livable Neighborhoods
Improvement Project includes approximately 222 total acres of land subdivided among four
separate sites; namely Garden Circle, Kings Garden I & II, Kings Garden III and Vista Verde. The
project includes: 34,200 linear feet of roadway, 7,840 linear feet of sidewalk, 19,000 linear feet of
storm sewer, 151 drainage structures, the regrading of 22,500 linear feet of swales, and the
addition of 112 street lights, along with street trees and landscape/hardscape. The project began
in 2009 and is continuing at present. Four phases are complete.
LW 2020 Year 1 Mater Plan | City of Lake Worth| Project design & permitting for:
▪ Project 1 - North K Street and North M Street from 2nd Avenue North to 9th Avenue North. An 8-inch
diameter watermain constructed on each street connecting to the existing 12-inch diameter PVC
main running east-west along 2nd Avenue North, and to the 8-inch diameter main running east-west
along 9th Avenue North. The existing north-south watermains were 2, 4, and 6-inch diameter cast
iron and 2-inch diameter galvanized steel lines in the alleys between the streets. Along with the
installation of the mains, the water meters at the property lines were relocated to the streets as
opposed to the alleys. Hydrants were added in the vicinity of 8th Avenue North, 4th Avenue North, and
3rd Avenue North. Existing hydrants between the streets that were in poor condition were replaced.
North K Street from 2nd Avenue North to 7th Avenue North was in poor condition and required
roadway and sidewalk reconstruction. A small segment at the southern end of each road fell within
Problem Area 8 of the City’s “Stormwater Master Plan”, and therefore the storm sewer was
upgraded.
▪ Project 3 - North F Street from 5th Avenue North to 10th Avenue North involved the construction of
both storm sewer and watermain. Flood staging did not meet the minimum City criteria for the 5 -
year, 24-hour event. Therefore, reconstruction of the storm sewer was required and water quantity
attenuation with exfiltration trench was implemented. To the north we connected a 12-inch diameter
main to the existing 12-inch diameter stub extending south from 10th Avenue North within the road
F | Page 15
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Douglas R. Taylor, P.E.
PROJECT ROLE | Civil Engineer
right-of-way and to the south tie into the 8-inch diameter main running east-west along 5th Avenue
North. The only existing north-south watermains were 6-inch diameter cast iron mains located in
both alleyways immediately east and west of North F Street. The meters were relocated within the
road right-of-way and two new fire hydrants were constructed with this project. No pavement was
identified with a PCI at or below 55 and therefore road reconstruction was necessary; however , utility
trenching necessitated pavement replacement in trench areas and asphalt overlay.
▪ Project 5 - North M Street from 9th Avenue North to 18th Avenue North involved the reconstruction of
roadway. The existing section of road was identified as in a failed condition with a PCI less than or
equal to 55. The entire road and base was reconstructed. The majority of the sidewalk also required
reconstruction. The existing storm sewer pipe and structures from 16th Avenue North to 18th Avenue
North was evaluated as to the condition of the materials. From 9th Avenue North to 16th Avenue
North storm sewer was added.
▪ Project 6 - on 11th Avenue North from Dixie Highway to North M Street involved the reconstruction of
roadway and storm sewer. Between North M Street and North L Street the existing road was rated as
being in a failed or poor condition with a PCI of less than or equal to 55. In these areas the entire
road and base was reconstructed. The structural condition of the existing storm sewer pipe and
structures along the roadway were evaluated. Piping and/or structures identified as in poor
structural condition were replaced.
▪ Project 8 - North J Street from 13th Avenue North to 16th Avenue North, and 15th Avenue North from
North J Street to the railroad tracks, and 14th Avenue North from North J Street to Dixie Highway was
identified as a part of Problem Area 3 in the “Stormwater Master Plan”. This project included the
installation of 700 linear feet of 24-inch diameter exfiltration trench with a nutrient separating baffle
box at the end of the trench, the replacement of 950 linear feet of existing 18 and 24 -inch diameter
storm sewer with 30-inch diameter RCP storm sewer, and the replacement of 70 linear feet of
existing 12-inch diameter storm sewer with 24-inch diameter RCP storm sewer.
Town of Davie - Eastside Drainage Infrastructure Improvements, Phases I thru III | Davie, Florida | Civil
Engineer. This construction provides drainage infrastructure for the development of a portion of the
Downtown Master Plan Area as well the redevelopment of SW 41st Court. The basic infrastructure work
consists of replacement of the existing water distribution system and new installation of sanitary sewer
system and storm drainage system. The work also includes several miles of roadway reconstruction with
landscaping and sidewalks. The water distribution was designed and permitted by CTA, included 14,800
linear feet of 6" diameter main, 5,075 linear feet of 8" diameter main, and 5,140 linear feet of 12"
diameter main. The sanitary improvements included 11,455 linear feet of 8" diameter pipe, 40 sanitary
manholes and 2,945 linear feet of 16" diameter forcemain. The project also included 18,940 linear feet
of storm sewer and the reconstruction of 5.2 miles of roadway.
Hallandale Beach NE Quadrant Drainage Study & Improvements, Hallandale Beach, Florida, Project
Manager. There are a number of drainage facilities within the 200-acre project area with limited
conveyance capacity and high head loss. Average lowest floor elevations average between 5.5’ to 6.5’
NGVD, and roadway elevations are approximately 3.7’ to 3.9’ NGVD within the study area. The
conveyance system is subject to the effects of tidal fluctuation; and therefore, at times there is virtually
no head available to drain the basin, and in addition no water quality tr eatment was provided. The lack of
conveyance capacity within this system has led to 37 Severe Repetitive Loss (RL) properties and the
complete inundation of the roadway system for extended periods during storm events of lesser frequency
than that required by SFWMD. Using ICPR, he modeled a proposed system of a pump station connected
to sixteen (16) wells. These sixteen new wells will be pressurized with fifteen (15) feet of head in order to
produce the necessary discharge into the G3 aquifer. A new storm sewer collection system was designed
and permitted, along with a water quality treatment system for the 200-acre tributary area.
F | Page 16
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Donald Shaver
PROJECT ROLE | Construction Manager
EDUCATION
Bachelor of Science - Construction Science
Kansas State University, Manhattan, Kansas | 1981
Associates in Technical Education, Building Science
Hutchinson Community College, Hutchinson, Kansas | 1978
REGISTRATIONS State of Florida General Contractor (Inactive)
YEARS OF EXPERIENCE 18 Years w/CTA – 37 Years Total
SUMMARY OF EXPERIENCE
Mr. Shaver is responsible for coordination with Clients and contractors,
supervision of inspection personnel, inspection of infrastructure engineering
projects including earthwork, water distribution, sanitary sewer systems, storm
drainage and roadways. Performs shop drawing reviews, pay application
processing, certifications, construction management and review of record
drawings for private and municipal clients.
WORK HISTORY
Craven Thompson & Associates, Inc., Fort Lauderdale, Florida
July 2000 to Present | Director of Construction Services / Construction
Manager
Craig A. Smith & Associates, Pompano Beach, Florida
1989 to 2000 | Vice Pres.-Land Development / Director - Construction Services
Frederic R. Harris, Inc., Fort Lauderdale, Florida
1987 to 1989 | Project Manager
Broward County Airport Expansion Office., Fort Lauderdale / Hollywood
International Airport - 1983 to 1987 | Project Manager
RELEVANT EXPERIENCE
South County Neighborhood Improvements Project | Broward County, Florida | Construction Manager
Mr. Shaver was responsible for the construction management of major sections of the South County
Neighborhood Improvement Project. The project consisted of twelve construction packages with a total
construction cost of approximately $70 million dollars. Improvements included water distribution,
sanitary sewer, lift stations, force main, storm water improvements and roadway construction. The project
included the design, permitting, bidding and construction consisting of 53 miles of roadway, 181,000
linear feet of storm sewer (including exfiltration trench), 140,618 linear feet of water main, 236,226
linear feet of gravity sanitary sewer, and 80 miles of sidewalk.
Garden Acres Neighborhood Improvements | Oakland Park, Florida | Construction Manager
Mr. Shaver was responsible for Construction management for the construction of the Garden Acres
Neighborhood Improvements. The project consisted of water distribution system, sanitary sewer system,
lift station, storm water system and roadway re-construction. Construction cost is $2.95 million.
Davie Road Phase 1 CEI Services | Town of Davie, Florida | Construction Manager
This project was for the construction engineering inspection services to re-construct a public roadway
known as Davie Road Phase 1 within public Right-of-Way owned by Broward County extending from the
State Road 84 Right-of-Way to Nova Drive. The length of the reconstruction was approximately 2,640
F | Page 17
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Donald Shaver
PROJECT ROLE | Construction Manager
linear feet. The primary intent was for CTA to provide construction engineering inspection services for the
re-construction of the roadway. The construction project consisted of pavement, base and sub -grade
reconstruction, curb & gutter construction, bike lane construction, sidewalk construction, median
construction, driveway reconstruction within the Right -of-Way, drainage system construction, landscaping
& irrigation construction, pavement marking & signage, traffic signal modification at Reese Road and at
Nova Drive, street lighting, and coordination with utility companies.
NE/NW 6th Street (Sistrunk Blvd.) Streetscape and Enhancement Project, Fort Lauderdale, Florida
Construction Management services and oversight of Resident Project Representative (RPR) for Sistrunk
Blvd. Streetscape and Enhancement Project. The project was funded and managed by the Fort
Lauderdale CRA and included streetscape improvements consisting of landscape, median, paver
sidewalk, lighting, drainage and other improvements. Work included close coordination with existing
businesses during construction, public relations to keep all parties informed of improvements,
maintenance of traffic coordination to ensure access to all affected properties throughout construction
and a full time RPR on-site managing the project. The project was federally funded including LAP funding
Eastside Master Infrastructure Project Phases 2 & 3 | Davie, Florida | Construction Manager
Mr. Shaver was responsible for construction management for the replacement of the existing water
distribution system and new installation of sanitary sewer system and storm drainage system. The work
also includes several miles of roadway reconstruction with landscaping and sidewalks. The water
distribution was designed and permitted by CTA, included 14,800 linear feet of 6" diameter main, 5,075
linear feet of 8" diameter main, and 5,140 linear feet of 12" diameter main. The sanitary improvements
included 11,455 linear feet of 8" diameter pipe, 40 sanitary manholes and 2,945 linear feet of 16"
diameter forcemain. The project also included 18,940 linear feet of storm sewer and the reconstruction
of 5.2 miles of roadway
Harlem McBride Area Drainage Improvements | Oakland Park, Florida | Construction Manager
He was responsible for Construction management for drainage and roadway construction of Harlem
McBride area. The project consisted of a water distribution system, a storm water system, and roadway
pavement overlay. Construction cost is $500,000.
City of Greenacres Municipal Complex | Greenacres, Florida | Construction Manager
He was responsible for Construction Management of the infrastructure for City Hall and Public Works.
The project consisted of installation of water distribution, sanitary sewer system, lift station, storm water
system and roadway and parking lot.
F | Page 18
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Richard D. Pryce, P.S.M.
PROJECT ROLE | Lead Surveyor
EDUCATION Associate of Science - Criminal Justice
Broward Community College | 1978
REGISTRATIONS Professional Surveyor and Mapper - Florida No. 4038 (1983)
PUBLICATIONS Co-author POB Magazine - "22,000 Acres and Counting" November 1998
Co-author POB Magazine - "The CAD Revolution", Sept. 1999
AREAS OF EXPERTISE Surveying
YEARS OF EXPERIENCE 12 Years w/CTA – 46 Years Total
AFFILIATIONS
Past Director - Broward County Chapter of FL Surveying & Mapping Society
State & County Chapters, FL Surveying & Mapping Society
American Congress on Surveying and Mapping
National Society of Professional Surveyors
American Society of Photogrammetry and Remote Sensing
SUMMARY OF EXPERIENCE
Mr. Pryce has over forty-six years of experience surveying in South Florida. He has
specialized in all aspects of the land surveying & mapping profession and has also
specialized in developing GIS/Survey applications using ESRI ArcGIS software since
1990. Mr. Pryce has specialized training in BLM PLSS retracement surveys, legal
research and resolving boundary disputes. Mr. Pryce has been fully trained on Leica
3D Laser Scanners and 3D Modeling for use in High Density Surveying of Commercial,
Historical and Utility Sites. He has also been developing ways to analyze Lidar data for
City-wide Storm water and Drainage studies.
WORK HISTORY
Craven Thompson & Associates, Inc., Fort Lauderdale, Florida
April 2006 to Present | Vice President, Surveying & GIS
Miller Legg & Associates, Inc., Pembroke Pines, Florida
October 1997 to April 2006 | GIS Coordinator/Service Manager/PSM
R.D. Pryce & Associates, Inc., Davie, Florida
October 1992 to October 1997 | President / Owner
RELEVANT EXPERIENCE
Miramar Historical Area Complete Streets Project – Phase II | Miramar, Florida | Principal Surveyor
Craven Thompson & Associates, Inc. was selected by the City of Miramar to prepare a right -of-way
topographic survey, design, permit, and provide construction services for Phase II of their Historical Area
Complete Streets Project. The project includes surveying, landscape and engineering design, permitting
and construction services for complete streets bounded by Pembroke Road to the north, County Line
Road to the south, SW 62nd Avenue to the west, and State Road 7 to the east. The project includes eight
(8) streets in the Historical Area. The improvements include: sidewalks, ADA ramps, crosswalks,
pedestrian level lighting, landscaping and hardscape. The City received a grant through the Broward
Redevelopment Program for the improvements.
North County Neighborhood Improvements Project, Northeast Quadrant, Broward County | Broward
County | Principal Surveyor – Mr. Pryce managed the surveying services necessary for the design and
permitting of the water distribution and sanitary sewer systems for this large rehabilitation project. The
project included a sanitary sewer collection system consisting of 69,550 linear feet - 8” gravity main, 807
linear feet - 10” gravity main, 129 linear feet - 12” gravity main, and 144 linear feet - 16” gravity main.
The sanitary force main system consisted of 540 linear feet - 8” main, and 1,540 linear feet 12” main.
The water distribution system additions included 35,626 linear feet - 6” main, 10,161 linear feet - 8”
F | Page 19
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Richard D. Pryce, P.S.M.
PROJECT ROLE | Lead Surveyor
main, 841 linear feet - 12” main, 1,306 linear feet - 20” main, and 1,023 linear feet - 24” main, for a
total of 9.27 miles of water main.
North County Neighborhood Improvement Project, Northwest Quadrant | Broward County, Florida |
Principal Surveyor - The North County Neighborhood Improvement Project, Northwest Quadrant included
approximately 650 acres of land between Dixie Highway and I-95, North of Sample Road, in the City of
Deerfield Beach. Mr. Pryce managed the surveying services necessary for the design and permitting for
the water distribution, sanitary sewer collection systems, storm sewer systems, and roadway
improvements for the entire 650 acres. The sanitary sewer collection system consisted of 22,047 linear
feet - 8” gravity main, and 34 linear feet - 10” gravity main. The sanitary force main system consisted of
295 linear feet - 8” main, 2,235 linear feet - 10” main, 3,790 linear feet 12” main, 4,300 linear feet - 16”
main, and 4,205 linear feet - 20” main. There were ninety-three (93) new sanitary manholes added to
the area. The water distribution system additions included 5,760 linear feet - 16” water main, 7,156
linear feet - 12” water main, 1,256 linear feet - 10” water main, 12,779 linear feet - 8” water main and
44,217 linear feet - 6” water main.
Utility Analysis Zone Improvement Program (UAZ) 308 | Broward County, Florida | Principal Surveyor
Mr. Pryce was responsible for the management of the surveying services necessary for the design and
permitting of a water distribution system and sanitary sewer collection system consisting of 19,253 linear
feet - 8” gravity main, a sanitary force main system consisting of 1,215 linear feet - 6” main, and a water
distribution system consisting of 18,281 linear feet - 6” main, and 575 linear feet - 8” main.
Utility Analysis Zone Improvement Program (UAZ) 124 | Broward County, Florida | Principal Surveyor
Responsible for the surveying services necessary for the design and permitting of the UAZ 124 project
located between Florida Turnpike, State Road 7, Commercial Boulevard and NW 39th Street. The
infrastructure improvements to the existing neighborhood included new water, sanitary sewer systems for
825 residences. This area is primarily residential, built in the 1950’s and early 1960’s. Mr. Gibney
assisted in modeling, design, permitting for the construction of the water distribution system additions
included 27,210 linear feet - 6” main, 6,040 linear feet - 8” main and 5,380 linear feet - 10” main for a
total of 38,630 linear feet of water main. The project also included the abandonment in-place and
grouting of 33,000 linear feet of existing water main, and the replacement of 825 water services.
Aerial LiDAR Surveying & Mapping | Hallandale Beach, Florida | Principal Surveyor
The survey included a GPS control network to meet horizontal and vertical accuracies to 0.10 feet on all
hard surfaces within the City Limits. This included setting 188 aerial targets to control an area of about
26,000 acres from Pembroke Road, south to the Broward / Miami-Dade County line and from the Atlantic
Ocean west to Interstate 95. Our survey crews then ran level loops and cross -sections over 862 ground
truth checks on hard surfaces at 80 street intersections across the City wi th accuracy of 0.05 feet at 67%
(one sigma) and 0.10 feet accuracy at 95% (two sigma). The Lidar was flown by our subcontractor,
Pickett & Associates, Inc., and checked by Craven Thompson & Associates, Inc. The Survey included 2 -
inch pixel resolution aerials, identifying and mapping overall drainage flows across the City for drainage
basin designation, including review of outfalls and drainage structures upstream.
City of North Miami Beach Consulting (Engineering, Surveying & GIS) Services | North Miami Beach
Mr. Pryce has managed all survey and GIS projects activities to date which are part of our general
consulting contract for the City of North Miami Beach on capital improvement projects. Survey work for
the City’s Water & Wastewater GIS project which includes surveying and mapping parcels and rights-of-
way in 40 Sections of land in their Water Service Area covering parts of five surrounding cities.
F | Page 20
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Joseph D. Handley, R.L.A.
PROJECT ROLE | Lead Landscape Architect
EDUCATION
B.S. in Ornamental Horticulture
Clemson University | 1976 - 1980
Attended Masters in Landscape Architecture Program
University of Georgia and Louisiana State University | 1981 - 1984
REGISTRATIONS Professional Registered Landscape Architect - Florida No. 1368 (1990)
AREAS OF EXPERTISE Landscape Architecture
YEARS OF EXPERIENCE 30 Years w/CTA – 35 Years Total
SUMMARY OF EXPERIENCE
Mr. Handley has been involved in a broad range of land planning projects in
South Florida for the past thirty-five years. Having worked in both the public and
private sectors, Mr. Handley is widely familiar with client needs and project
requirements and processes. He is responsible for overseeing the preparation
and processing of plats, site, landscape, hardscape, streetscape and irrigation
plans; utilizing his knowledge of local, state and federal regulations involved in
land development. He has direct client contact to obtain project input and
approvals, responsible for completion of projects on time and within budget.
WORK HISTORY
Craven Thompson & Associates, Inc., Fort Lauderdale, Florida
September 1993 - Present | Vice President, Planning and Landscape
Architecture
February 1988 - September 1993 | Senior Land Planner
RELEVANT EXPERIENCE
North Central County Neighborhood Improvements Project | Broward County, Florida | Principal
Landscape Architect Preparation of Basis of Design Report, Contract Documents, Permitting and
Construction Management for 980-acre retrofit infrastructure and landscape improvements within
unincorporated Broward County.
Central County Neighborhood Improvements Project | Broward County, Florida | Principal Landscape
Architect - Preparation of Basis of Design Report, Construction Documents, Permitting and Construction
Management for 1,800 acre retrofit infrastructure and landscape improvements within unincorporated
Broward County.
South County Neighborhood Improvements Project | Broward County, Florida | Principal Landscape
Architect - Preparation of Basis of Design Report, Construction Documents, Permitting and Construction
Management for 1,400 acre retrofit infrastructure and landscape improvements within unincorporated
Broward County. Client: Broward County Office of Environmental Services.
Sunrise Bicycle/Pedestrian, Greenways and Trails Master Plan | Sunrise | Principal Landscape Architect
Craven Thompson & Associates, Inc. along with Alta Planning + Design was hired by the City of Sunrise to
prepare a Bicycle / Pedestrian Greenways & Trails Master Plan. The Plan defines a system of sidewalks,
bike lanes, paths, greenways and trails within the City of Sunrise that provides integrated and
continuous corridors for non-motorized transportation and recreation throughout the city in a manner
that is sensitive to the needs of various user groups, the natural and built environment, the
management and maintenance, and potential funding capabilities of local government.
F | Page 21
CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400
Joseph D. Handley, R.L.A.
PROJECT ROLE | Lead Landscape Architect
NW 44th Street Passive Park and Oakland Park Boulevard Passive Park | Sunrise, Florida | Principal
Landscape Architect - Construction Cost: $8 Million. These 2 passive parks developed under the
Broward County Parks Bond Program include upland and wetland restoration, a splash pad, a nature -
themed playground, restroom and storage buildings, jogging paths, picnic shelters and canal boardwalk.
NE 38th Street (Andrews Avenue to NE 11th Avenue) | Oakland Park, Florida | Principal Landscape
Architect - Landscape, streetscape and irrigation design for the roadway reconstruction design of
approximately 0.90 miles of roadway improvements including neighborhood traffic calming.
Features to Enhance Neighborhood Integrity | Oakland Park, Florida | Principal Landscape Architect
Redesign of the entry features for the Royal Palm Isles and South Royal Palm Acres.
NE 34th Court Reconstruction (NE 2nd Avenue to Dixie Highway) | Oakland Park, Florida | Principal
Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction
design of approximately 0.60 miles.
NE 5th Avenue Reconstruction (Oakland Park Blvd to NE 38th Street) | Oakland Park, Florida | Principal
Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction
design of approximately 0.60 miles.
Miramar Parkway (I-75 to Flamingo Road) | Miramar, Florida | Principal Landscape Architect
Landscape, streetscape and irrigation design for the roadway reconstruction design of 2.5 miles.
Sheridan Street (NW 172nd Avenue to NW 184th Avenue) | Pembroke Pines, Florida | Principal
Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction
design of approximately 1 mile.
Pembroke Road (SW 145th Avenue to Silver Shores) | Miramar & Pembroke Pines, Florida | Principal
Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction
design of approximately 1.5 miles.
Sunrise Boulevard (Hiatus Road to Pine Island Road) | Sunrise, Florida | Principal Landscape Architect
Landscape, streetscape and irrigation design for the roadway reconstruction design of approximately 1.8
miles.
Broward Boulevard (Pine Island Road to University Drive) | Plantation, Florida | Principal Landscape
Architect - Landscape, streetscape and irrigation design for the roadway reconstruction design of
approximately 0.80 miles.
City of Dania Beach Public Services Administration Building | Dania Beach, Florida | Principal
Landscape Architect - The Public Services building was a complicated project due to the expansive area
of parking for the utility vehicles. The perimeter had to be heavily landscaped to compensate for the
paving area and to help screen the facility from the neighboring residential properties. The landscape
materials utilized were 100% native to provide a positive example to the community on how the City has
taken an effort to design with the environment in mind.
F | Page 22
Resume
James William Kappes, P.E., Electrical Engineer
Hillers Electrical Engineering, Inc.
Education
Bachelor of Science in Electrical Engineering, 2005
Florida Atlantic University
Professional Registration
Registered Electrical Engineer, Florida No. 71499
Experience
13 years electrical design and construction management
Hillers Electrical Engineering, Inc., 2005 to present
Airport experience includes runway, taxiway, centerline, runway guard lights, apron and
approach lighting systems for major air carrier and general aviation airports, guidance and
mandatory signage, MALSR, LAHSO, PAPI, REIL and NAVAID systems, instrumentation
landing systems, FAA coordination, airfield lighting control systems, airfield electrical vaults,
aircraft maintenance hangars, T hangars, fuel systems, and security systems.
Design and construction services experience includes: electrical distribution, control and
communication systems for water-waste water facilities and storm water pumping facilities;
medium and low voltage systems; control; communication; lighting; security; access control; fire
alarms; normal and standby generation systems; lift stations; inspections of existing facilities;
county administration and maintenance facilities.
Transportation experience includes lighting and power distribution design for Florida
Department of Transportation major roadways, interchanges, bridge exterior and interior
electrical and lighting systems, signage systems, including illumination and voltage drop
calculations, pole locations, power supply and distribution, 100% plans and project review
process, coordination with utilities departments, writing specifications and completing estimates
and tabulation quantities for state, county, and municipal agencies in the state of Florida.
Sports lighting, electrical distribution, site lighting, parking lot lighting, testing of existing
electrical systems, communications, public address and scoreboard systems design and
construction management for minor and recreational football, baseball, and soccer complexes
owned by county, municipal agencies and private developers.
Water and waste water experience includes control and communication systems for water-waste
water facilities and storm water pumping facilities.
Skills include: specification creation; value engineering; energy analysis; testing; cost estimates;
start-up; onsite inspections; condition assessment. Proficiency with AutoCAD, LitePRO, GE
Lighting Systems Aladan + Plus.
F | Page 23
Resume
Amy L. Champagne-Baker, P.E., Senior Electrical Engineer
Hillers Electrical Engineering, Inc.
Education
Bachelor of Science in Electrical Engineering, 1997
Clarkson University
Professional Registration
Registered Electrical Engineer, Florida No. 73735
Experience
21 years electrical design and construction management
Hillers Electrical Engineering, Inc., 1997 to present
Airport experience includes runway, taxiway, centerline, runway guard lights, wig-wags, apron
and approach lighting systems for major air carrier and general aviation airports, guidance and
mandatory signage, MALSR, LAHSO, PAPI, REIL, ODALs, glideslope, instrument landing
systems, FAA relocation of RT and RR facilities, FAA coordination, airfield lighting control
systems, airfield electrical vaults, aircraft maintenance hangars, T hangars, fuel systems,
security systems, parking garages, and park and ride lighting.
Transportation experience includes lighting and power distribution design for Florida
Department of Transportation major roadways, interchanges, bridge exterior and interior
electrical and lighting systems, signage systems, including illumination and voltage drop
calculations, pole locations, power supply and distribution, 100% plans and project review
process, coordination with utilities departments, writing specifications and completing estimates
and tabulation quantities for state, county, and municipal agencies in the state of Florida.
Sports lighting, electrical distribution, site lighting, parking lot lighting, testing of existing
electrical systems, communications, public address and scoreboard systems design and
construction management for professional, minor and recreational football, baseball, soccer,
tennis, hockey, basketball and roller hockey complexes owned by county, municipal agencies
and private developers.
Design and construction services experience includes electrical distribution, medium and low
voltage systems, communication, lighting, security, access control, baggage handling, fire alarms
systems, CCTV, normal and standby generation systems, lift stations, and on-site construction
services for main airport terminal buildings, airfields, county administration & maintenance
facilities.
Skills include: specification creation; constructability review, value engineering; energy analysis;
testing; cost estimates; start-up; onsite inspections; and condition assessments. Proficiency with
AutoCAD, MicroStation, SKM Power Tools for Windows DAPPER, CAPTOR, LitePRO, GE
Lighting Systems Aladan + Plus.
Professional Membership
Institute of Electrical and Electronic Engineers (IEEE)
LEED Accredited Professional F | Page 24
Education
9/1977 – 12/1983 – BSME University of
Toledo, Ohio
Licenses
▪ State of Florida – Professional Engineer
▪ State of Florida Building Contractor
License
▪ State of Florida Mechanical Contractor
License
Professional Memberships
▪ American Society of Heating, Refrigerating and Air Conditioning Engineers
▪ Institute of Electronics and Electrical Engineers, Inc.
Professional Accreditation
▪ United States Green Building Council - LEED® Accredited Professional
▪ ACG Commissioning Group – Washington, DC – Certified Commissioning Authority (CxA)
Professional Experience
Mr. Kamm is the founder and C.E.O. of Kamm Consulting, Inc. He has 30+ years of
experience in mechanical and electrical engineering and the construction industry. His in-
depth knowledge and experience are unique to the engineering profession. He has a
diversified background in the engineering and design of complex, highly available facilities.
His direct, hands-on work experience in the construction industry gives him a practical
perspective of considerable value to clients requiring optimum performance of their facilities
investments.
Mr. Kamm has extensive experience in providing facilities analyses of HVAC, electrical,
plumbing, and fire protection problems. These analyses include inspection, testing,
commissioning, and trouble-shooting all types of mechanical / electrical systems. He has
expertise in providing building evaluations and studies for owners/developers during the due
diligence period for real estate transactions involving large commercial buildings, and has
also served as an expert witness for litigation involving engineering and construction issues.
Mr. Kamm has been directly involved in over 70 LEED Registered projects including LEED for
New Construction, LEED LEED for Schools, LEED for Commercial Interiors and LEED for Core
& Shell buildings. He has been retained as Commissioning Agent for Fundamental and
Enhanced Commissioning as well as Commissioning Agent for commercial buildings. As the
LEED Accredited Professional, he has led initial design charrettes with LEED project design
teams representing all disciplines as well as providing oversight for all USGBC required
documentation for LEED Certification.
F | Page 25
Education
1975 – 1980 - MSME, Bucharest Polytechnic Institute, Romania. MBA - Florida Atlantic
University
Licenses
Florida Professional Engineer
Professional Accreditation
USGBC LEED AP
Employment History
8/24/98 – Present: Director of Mechanical Engineering – Kamm Consulting, Inc., Deerfield
Beach, Florida.
Professional Memberships
American Society of Heating, Ventilation and Air Conditioning Engineers (ASHRAE)
Professional Experience
Mr. Pella has 20+ years of mechanical engineering and project management experience,
with broad, in-depth involvement in HVAC and fire sprinkler systems design. He is an
experienced, capable leader of multi-discipline engineering teams.
As a senior design professional with Kamm Consulting, Mr. Pella is responsible for planning,
designing and implementing a broad range of projects. Mr. Pella has completed multiple
new-construction and renovation projects for multi-family, mixed use, office buildings, hotels,
restaurants, medical facilities, computer rooms, telecommunications facilities, call centers,
retail and commercial centers, schools, condominiums and custom residences. Mr. Pella
consistently delivers practicable solutions on time and on budget. His experience is
particularly valuable to clients requiring continuous availability of their technology
investments. Mr. Pella excels in trouble-shooting problem HVAC systems and analysis of
older, non-documented systems.
F | Page 26
Absolute Civil Engineering Solutions, LLC
4121 SW 47th Avenue, Suite 1319, Davie, FL 33314
Wayne Webb, P.E.
Vice President/Principal Engineer
Awarded "2014 Engineer of the Year by the Broward County Building Officials
Association", Mr. Wayne Webb currently serves as the Vice President and Principal
Engineer of Absolute Civil Engineering Solutions, LLC. Since the inception of his
career 26 years ago, Mr. Webb has spent the last decade successfully managing a
variety of civil, geotechnical, environmental, and structural engineering and testing
contracts within the State of Florida. His focus has been providing materials
engineering construction and construction materials testing/inspection services for a
wide range of projects such as schools, ports, hotels, office buildings, parking
structures, large mixed-use developments, and transportation projects. He most
recently served as the Private Provider responsible for the Building, Structural,
Mechanical, Electrical, Plumbing Code Compliance Plan Review and Inspections for
the Met II Hotel and Office Towers located in the City of Miami, which is the largest
Private Provider project to date.
Mr. Webb’s other relevant experience includes providing civil engineering, building
envelope evaluations, infrastructure evaluations, roof testing and design, property
condition assessments, forensic testing and evaluations, and engineering consulting
services. In addition, Mr. Webb has performed a variety of environmental
engineering services including environmental site assessments (Phase I and Phase II
ESA’s), contamination assessment reports, tank closure reports, remedial action
plans, compliance audits and monitoring only plans (MOP). He is a recognized
leader in the assessment of water-entry problems in both residential and commercial
buildings. Mr. Webb has performed hundreds of inspections for both builders and
homeowners to determine either if moisture entry has occurred or to wha t extent the
moisture entry has affected the building. Specific recommendations are made based
on these assessments for corrective action or remediation. He also performs framing -
stage and pre-closing inspections of homes and high-rises for major builders as a way
to prevent certain water-entry problems from occurring and consults with these
builders for any applicable water-entry issues.
REPRESENTATIVE PROJECT EXPERIENCE:
Retail:
• Walgreens, Hialeah, Florida
• South Dade Shopping Center, Miami, Florida
• Arch Creek Shopping Center, Miami, Florida
• Macy’s at Pembroke Lakes, West Palm Beach, Florida
• Badcock Furniture, Aventura, Florida
• Sterling Town Center, Fort Lauderdale, Florida
Residential Development:
• The Preserve, Coconut Creek, Florida
• Chapel Trail, Pembroke Pines, Florida
• Enclave @Doral, Miramar Lakes, Florida
EDUCATION:
MPH research Studies,
University of the West Indies,
1985-1988
B.S.C.E., University of the West
Indies, 1984
CERTIFICATIONS /
REGISTRATIONS:
• Registered professional
Engineer, State of Florida,
56701
AFFILIATIONS:
• Florida Engineering Society
• American Concrete Institute
• American Society of Civil
Engineers
• Deep Foundation Institute
F | Page 27
4121 SW 47th Avenue, Suite 1319, Davie, FL 33314
WAYNE WEBB’S REPRESENTATIVE PROJECT EXPERIENCE (cont’d)
Education:
• Florida International University, Miami, Florida
• Gilbert Porter Elementary School, Miami, Florida
• North Miami Senior High School, Miami, Florida
• University of Miami, Coral Gables, Florida
• Miami-Dade College, Miami, Florida
• St. Brendan High School, Miami, Florida
Apartment/Condominiums:
• Ocean One, Miami, Florida
• Ocean Two, Miami, Florida
• Ocean Three, Miami, Florida
• Trump Tower I, II, III, Miami, Florida
• Icon Brickell, Miami, Florida
• 50 Biscayne, Miami, Florida
• La Costa Apartments, Boca Raton, Florida
• Royal Pointe Town Villas, Miami, Florida
• Ibis Villas, Miami Gardens, Florida
• Seaside Residences, Key West, Florida
• Club West St. Andrews @ Kings Point, Delray, Florida
Municipalities/Government:
• Miami Dade County, Florida
• City of Sunrise, Florida
• City of Plantation, Florida
• City of Hollywood, Florida
• City of Coral springs, Florida
• City of Fort Lauderdale, Florida
• City of Miami Beach, Florida
• City of Coral Gables, Florida
• City of Miami, Florida
Office:
• General Funding Building, Coral Gables, Florida
• Met 2 Office Tower, Miami, Florida
• Perez Office Building, Fort Lauderdale, Florida
• Esplanade Medical Center, Miami, Florida
• Exxon Silver Bluff Corporate Park, Miami, Florida
Hotel:
• Met 2 Hotel Tower, Miami, Florida
• Ritz Carlton, The Cayman Islands
• Holiday Inn Express, Miami, Florida
• Victor Hotel, Miami Beach, Florida
F | Page 28
ANDRES GARCIA, ULM
Utility Location Manager, ULM
InfraMap Corp - West Palm Beach, Florida
EDUCATION
Palm Beach State College, Associates in Science
TRAINING
InfraMap Training Program for Utility Locating & Designating Certification/Instructor
ATSSA, Traffic Control Supervisor Certification, August 2000
Confined Space Entry Training Program Certification (OSHA 1910.146)
FUCC Utility Coordination Discussion Seminar Regular Attendee
CSX Roadway Worker Protection Annual Certification
KEY QUALIFICATIONS
Mr. Garcia has performed utility locating assignments for InfraMap Corp in Florida, Virginia, Maryland, Georgia
and Alabama since 1998. He currently is a Senior Utility Location Manager and is proficient with utility
designating, performing test holes and utility CADD. Mr. Garcia’s responsibilities include utility designation and
test hole project management, attending utility scoping meetings, obtaining permits, records research, traffic
control supervision, field data collection, quality control of the field work and FDOT Standards Compliance for
each delivered submittal. His duties also include vacuum excavation equipment maintenance.
Mr. Garcia has excelled as a survey party chief with experience in Total Station survey and data collector
knowledge (electronic field book, TDS functions, and three wire bench runs and GPS/RTK on several
designating and utility locating projects). His assistance in the survey EFB data collection compliance further
adds to InfraMap’s knowledge and experience. His role as Senior Utility Location Manager is obtaining utility
records and ROW permits, QA/QC, supervisory of field crews, meeting with utility company personnel and
Maintenance of Traffic (MOT) set up.
PROJECT EXPERIENCE
FDOT District 4 - District-Wide Utility Locating Services Contract # C-9161 (April 18, 2011 - Current):
InfraMap has provided utility designating, air/vacuum test holes, survey and EFB/CAiCE/MicroStation CADD
on highway projects in District 4 in support of the District’s pre-design program through private consultants and
in-house design program. InfraMap has had a district-wide utility locating contracts since 1996. Reference: Mr.
Jeff Smith, District Surveyor (954) 777-4579
FDOT District 4 – District-Wide Survey Services Contract # C9906 (December 2012 – December 2017)
InfraMap provides utility designating, air/vacuum test holes, and EFB/CAiCE/MicroStation CADD on survey
projects. We are a sub-consultant to Bowman Consulting. Reference: Mr. Adam Dao, PSM (772) 283-1413
FDOT District 4 – District-Wide Survey Services Contract # C9160 (June 2015 – December 2020)
InfraMap provides utility designating, air/vacuum test holes, and EFB/CAiCE/MicroStation CADD on survey
projects. We are sub-consultant to Biscayne Engineering Inc. Reference: Mr. Mik e Bartholomew, President
(305) 324-7671
FDOT District 4 – Designating Services for Port Saint Lucie Contract # C9161 (February 2015 –
February 2025) InfraMap provides utility designating, air/vacuum test holes, and EFB/CAiCE/MicroStation
CADD on this designating project in District 4. InfraMap is a sub-consultant to American Consulting Engineers
of Florida, LLC. Reference: Mr. Christopher O’Reilly, PE (561) 253-9563
FDOT District 6 District-Wide Utility Locating Services Contract # C-9C12 (July 25, 2013 - Current):
InfraMap has provided utility designating, air/vacuum test holes, survey and EFB/CAiCE/MicroStation CADD
on highway projects in District 6 in support of the District’s pre-design program through private consultants and
in-house design program. InfraMap has had consecutive district-wide utility locating contracts since 1997.
Reference: Mr. Tony Soto, Project Manager (305) 470-5232
F | Page 29
Masuen Consulting. LLC Design • Consult • Manage
JUDY JENSEN
Water Resource Consultant
Ms. Jensen’s responsibilities include training new designers, water conservation consulting,
LEED consulting and design, irrigation design, & project design coordination.
Years with Masuen: 13 Years
EDUCATION / PROFESSIONAL
o Associate of Arts in General Education, (with Honors), Daytona
State College, 2003
o Associate of Applied Science in Architectural & Building Technology, (with Honors),
Advanced Technology Center at Daytona State College, 2005
o Certified Landscape Irrigation Auditor (CLIA) - Irrigation Association, 2006
o Certified Golf Irrigation Auditor (CGIA) - Irrigation Association, 2008
o US Green Building Council LEED AP, 2008
o Certified Irrigation Designer, Commercial, 2011
PROJECTS
o Port St Lucie Botanical Gardens, Port St Lucie, Florida
o Brickell Park, Miami, Florida
o 44th Street Park, Sunrise, Florida
o 66th Avenue, Vero Beach, Florida
o State Road 5, Fort Pierce & Delray Beach, Florida
o 1111 Lincoln Road Penthouse, Miami, Florida
o Apogee, Miami, Florida
o Jade Signature, Sunny Isles, Florida
o Century Village East, Deerfield Beach, Florida
o Talmadge Lofts, Savannah, Georgia
o Broward County Convention Center (LEED), Broward County, Florida
o Element Hotel (LEED), Miami, Florida
o Headquarters Honda (LEED), Clermont, Florida
o Nova Southeastern University Oceanic Center (LEED), Dania Beach, Florida
o City Furniture (LEED), Cutler Bay, Florida
o Perry Hotel Remodel (LEED), Miami, Florida
PROFESSIONAL ORGANIZATIONS:
o Corporate Member of United States Green Building Council (USGBC)
o Professional Member of The Irrigation Association (IA)
o WaterSense Partner
F | Page 30
S
e
c
t
i
o
n
G
C
o
r
p
o
r
a
t
e
S
t
a
n
d
i
n
g
a
n
d
A
u
t
h
o
r
i
z
e
d
S
i
g
n
a
t
o
r
y
State of Florida
Department of State
I certify from the records of this office that CRAVEN, THOMPSON &
ASSOCIATES, INC. is a corporation organized under the laws of the State of
Florida, filed on January 1, 1962.
The document number of this corporation is 254407.
I further certify that said corporation has paid all fees due this office through
December 31, 2018, that its most recent annual report/uniform business report
was filed on January 16, 2018, and that its status is active.
I further certify that said corporation has not filed Articles of Dissolution.
Given under my hand and the
Great Seal of the State of Florida
at Tallahassee, the Capital, this
the Sixteenth day of January, 2018
Tracking Number: CC1640127508
To authenticate this certificate,visit the following site,enter this number, and then
follow the instructions displayed.
https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication
G | Page 1
3563 NW 53RD STREET
FORT LAUDERDALE, FL 33309
Current Principal Place of Business:
Current Mailing Address:
3563 NW 53RD STREET
FORT LAUDERDALE, FL 33309
Entity Name:CRAVEN, THOMPSON & ASSOCIATES, INC.
DOCUMENT# 254407
FEI Number: 59-0948029 Certificate of Status Desired:
Name and Address of Current Registered Agent:
MCDONALD, THOMAS MICHAEL
3563 NW 53RD ST
FT LAUDERDALE, FL 33309 US
The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both, in the State of Florida.
SIGNATURE:
Electronic Signature of Registered Agent Date
Officer/Director Detail :
I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under
oath; that I am an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607, Florida Statutes; and that my name appears
above, or on an attachment with all other like empowered.
SIGNATURE:
Electronic Signature of Signing Officer/Director Detail Date
THOMAS M MCDONALD
FILED
Jan 16, 2018
Secretary of State
CC1640127508
THOMAS MICHAEL MCDONALD PRESIDENT 01/16/2018
2018 FLORIDA PROFIT CORPORATION ANNUAL REPORT
Yes
01/16/2018
Title DPT
Name MCDONALD, THOMAS
Address 7630 MARBLEHEAD LANE
City-State-Zip: PARKLAND FL 33067
Title V
Name PRYCE, RICHARD
Address 13901 SW 26TH STREET
City-State-Zip: DAVIE FL 33326
Title V, SECRETARY
Name HANDLEY, JOSEPH D
Address 3470 NE 17TH TERRACE
City-State-Zip: OAKLAND PARK FL 33334
Title VP
Name GIBNEY, PATRICK J
Address 3563 NW 53RD STREET
City-State-Zip: FORT LAUDERDALE FL 33309
G | Page 2
T
a
b
8
M
i
s
c
e
l
l
a
n
e
o
u
s
S
e
c
t
i
o
n
H
V
a
r
i
a
t
i
o
n
s
/
E
x
c
e
p
t
i
o
n
s
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION H - VARIATIONS / EXCEPTIONS
VARIATIONS / EXCEPTIONS
All Professional Services that Craven Thompson & Associates, Inc. (CTA) provides are listed in
Section E – Qualification Information and Assigned Personnel.
CTA has no variations or exceptions to any section of the proposal.
H | Page 1
S
e
c
t
i
o
n
I
L
i
t
i
g
a
t
i
o
n
S
t
a
t
e
m
e
n
t
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION I – LITIGATION STATEMENT
LITIGATION STATEMENT
The following is a list of litigation matters in the past five (5) years:
Case No.: Palm Beach County Case No. 502013CA007785XXXXMBAJ
Date: Case filed June 4, 2013 / Dismissed February 2015
Case No.: Palm Beach County Case No. 502016CA006688XXXXMB
Date: Case re-opened March 2017– Case Settled September 2017
Monetary Amount Involved: $15,000.00
Position: Defendant
Name of Case: The Edge No. One Condominium Association, Inc. vs. The Edge Investors, L.P.;
Coastal Construction of South Florida, Inc.; Trans Coastal Construction Company; Steven Feller,
P.E., P.L.; Cohen, Freedman, Encinosa & Associates-Architects, P.A.; CHM Consulting Engineers,
Inc.; Craven Thompson & Associates, Inc.
Explanation: Plaintiff claimed unspecified problems with the building. It was unclear what civil
engineering issues were relevant. The contractor, architect and the entire design team were
defendants.
Date: Case filed June 9, 2015 / Settled December 9, 2016
Monetary Amount Involved: $150,000 (Giannetti Contracting - $120,000, Craven Thompson -
$30,000)
Case No.: Broward County Case No. 14-002381 (21)
Name of Case: Broward County Case No. 14-002381 (21) - Randy Ezekowitz vs. Giannetti
Contracting Corporation, E&N Construction, Inc., Asphalt Milling Services, Inc., Bon's
Barricades, Inc., Florida Department of Transportation, Craven Thompson & Associates, Inc.
and Transfield Services Infrastructure, Inc.
Explanation: Plaintiff claims that CTA failed to warn motorists of the difference in elevation of
pavement. Plaintiff did not specify a specific claim related to Civil Engineering.
Date: Case filed Sept. 11, 2011 / Dismissed October 18, 2013
Monetary Amount Involved: None.
Case No.: Palm Beach County Case No. 502011CA014555XXXXMB
Case Name: Darlene Cookish vs. Craven Thompson & Associates, Inc.
Explanation: No complaint was ever filed. CTA only received a summons for information. The
incident did not involve any of our projects. It involved a project next door. Nothing involved
Craven Thompson. When this was explained to the plaintiff’s attorney, no further action was
taken on their part. The statute of limitations has since passed.
I | Page 1
S
e
c
t
i
o
n
J
F
o
r
m
s
a
n
d
A
t
t
a
c
h
m
e
n
t
s
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION J - FORMS AND ATACHMENTS
PROJECT NAME North County Neighborhood Improvement Project,
Northeast Quadrant, Bid Package 11
Pompano Beach, Florida
CLIENT Mr. Patrick MacGregor
Expansion Coordinator
Broward County Water and Wastewater Services
2555 West Copans Road
Pompano Beach, Florida 33069
Phone: (954) 831-0904
Email: pamacgregor@broward.org
PROJECT START DATE Design: November 2009
Construction: October 2011
PROJECT COMPLETION DATE Design: February 2011
Construction: 2014
ENGINEER’S ESTIMATED
CONSTRUCTION COST
$23,033,142.00
ACTUAL CONSTRUCTION COST $17,608,000.00
PROJECT SUMMARY
The infrastructure improvements to the existing neighborhood included new roadway, sidewalk
drainage, swale regrading, landscaping, water, sanitary sewer, and signage, Bid Package 11 was
the final area in the North County Neighborhood Improvement, NE Quadrant. The area is
primarily residential that was developed in the 1950’s. The existing infrastructure was longer
suitable to meet the current standards for water and sanitary sewer facilities. The Project was
completed under budget and on time. The North County Neighborhood Improvement Project
(NCNIP) Northeast Quadrant, Bid Package 11 included approximately 357 acres of land
between Dixie Highway and Federal Highway, north of Sample Road in Broward County. The
project included over 50,688 linear feet of
new roadway construction, sidewalks,
driveway aprons, and sodded swales In
addition the project included over 14,777
linear feet of new storm sewer, 12,993
linear feet of exfiltration trench, 64,000
linear feet of water main, 553 Water
Services (many of these services were
moved from the rear of the lot to the front),
49,700 linear feet of reuse water main,
796 reclaimed water services, 43,805
linear feet of gravity sewer main, 750
sewer laterals, lift station, and 1,630 linear
feet of force main. CTA provided surveying,
civil engineering, landscape architecture
and CEI services on the project.
J | Page 3
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION J - FORMS AND ATACHMENTS
PROJECT NAME Garden Acres Neighborhood Improvements
Oakland Park, Florida
OWNER / CLIENT Ms. Jennifer Frastai, ICMA-CM
Director of Engineering & Community Development
City of Oakland Park
5399 N. Dixie Highway, Suite 3
Oakland Park, Florida 33334
Phone: (954) 630-4477
Email: Jenniferf@oaklandparkfl.gov
PROJECT COMPLETION DATE Design: 2012 - 2013
Construction: 2013 - 2014
CTA FEES $195,069.00
FINAL CONSTRUCTION COST $2,644,372.00 (4 Change Orders)
PROJECT SUMMARY
Garden Acres was a single-family residential neighborhood approximately with an area of
approximately 24 acres. The new drainage system consists of 4” deep roadway swales,
drainage pipes and structures, exfiltration trenches and two controlled discharge points into
an existing drainage system located within the NE 6th Avenue right-of-way. The roadway
swales help with the storage and convey the runoff from the roadway and the house lots.
The swales and exfiltration trenches handle the water quality volume generated by the
roadway right-of-way area. CTA analyzed the system using ICPR software. CTA provided
design, permitting and CEI services for the project. The roadway restoration consisted of
4,985 linear feet of roadway. The drainage
system consisted of 2,136 linear feet of
storm sewer, 4,171 linear feet and of
exfiltration trench. The project also included
major roadway, water and sanitary sewer
improvements. The water improvements
consisted of 5,591 linear feet of 6” diameter
main, and 962 linear feet of 8” diameter
main. The sanitary improvements consisted
of 7,045 linear feet of 8” diameter sewer,
218 linear feet of 4” diameter forcemain, and
1,044 linear feet of 6” diameter forcemain.
Improvements included two lift stations.
J | Page 4
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES
UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01
SECTION J - FORMS AND ATACHMENTS
PROJECT NAME City of Miami Gardens Livable Neighborhood Project
Miami Gardens, Florida
CLIENT Mr. Tom Ruiz, Director of Public Works
City of Miami Gardens
1050 NW 163rd Drive
Miami Gardens, Florida 33169
Phone: (786) 279-1260
Email: truiz@miamigardens-fl.gov
PROJECT START / COMPLETION
DATE
August 2009 - Ongoing
EST. CONSTRUCTION BUDGET $6,683,87.00
ENGINEER’S DESIGN BUDGET $902,124.74
SERVICES PROVIDED Craven Thompson & Associates (CTA) provided all of the
surveying services, storm water master planning, all civil
engineering, all landscape architectural, and construction
management for the project.
PROJECT SUMMARY
The Livable Neighborhoods Improvement Project is subdivided among four separate sites;
namely Garden Circle, Kings Garden I & II, Kings Garden III and Vista Verde. The various
project sites are all located within the confines of NW 183rd Street (Miami Gardens Drive),
NW 215th Street (County Line Road), NW 47th Avenue, and NW 37th Avenue in the City of
Miami Gardens, Florida. No storm water quality treatment or quantity attenuation facilities
were included in the initial developments, which are apparent through the numerous
drainage issues observed. The Livable Neighborhoods Improvement Project includes
approximately 222 total acres of land. The project includes: 34,200 linear feet of roadway,
7,840 linear feet of sidewalk, 19,000 linear feet of storm sewer, 151 drainage structures,
the regrading of 22,500 linear feet of swales, and the addition of 112 street lights, along
with street trees and landscape/hardscape.