Loading...
HomeMy WebLinkAboutCraven Thompson & Assoc.PREPARED FOR REQUEST FOR QUALIFICATIONS • RFQ NO. 18-08-01 C T A Craven Thompson & Associates, Inc. Project Management Engineering Landscape Architecture Surveying & Planning 3563 NW 53rd Street, Fort Lauderdale, FL 33309Phone: (954) 739-6400 SEPTEMBER 4TH, 2018 CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUND AND ROADWAY IMPROVEMENTS (CCNA) PDF FORMAT S e c t i o n A T i t l e P a g e CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION A - TITLE PAGE Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) Request for Qualifications No. 18-08-01 Submitted to: City of Sunny Isles Beach Office of the City Clerk 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Submitted by: Craven Thompson & Associates, Inc. 3563 NW 53rd Street Fort Lauderdale, Florida 33309 c/o Tim Hall, P.E., (954) 739-6400 September 4, 2018 A | Page 1 S e c t i o n B T a b l e o f C o n t e n t s CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION B – TABLE OF CONTENTS PAGE NO. SECTION A - TITLE PAGE ▪ Title Page ................................................................................................................................... A-1 SECTION B - TABLE OF CONTENTS ▪ Table of Contents ..................................................................................................................... B-1 SECTION C - COVER LETTER AND EXECUTIVE SUMMARY ▪ Cover Letter and Executive Summary .....................................................................................C-1 SECTION D - PROJECT APPROACH AND UNDERSTANDING ▪ Project Approach and Understanding..................................................................................... D-1 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL ▪ Qualification Information .......................................................................................................... E-1 ▪ Standard Form 330 ............................................................................................................... E-14 o Project Organizational Chart ........................................................................................... E-15 ▪ Professional Licenses and Corporate Charter ..................................................................... E-49 SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED ▪ Company Overview .................................................................................................................. F-1 ▪ References ................................................................................................................................ F-2 ▪ Organizational Chart ................................................................................................................. F-8 ▪ Professional Resumes .............................................................................................................. F-9 SECTION G - CORPORATE STANDING AND AUTHORIZED SIGNATORY ▪ State of Florida Certificate of Good Standing ........................................................................ G-1 ▪ Sunbiz Document Listing Officers ........................................................................................... G-2 SECTION H - VARIATIONS / EXCEPTIONS ▪ Variations / Exceptions ........................................................................................................... H-1 SECTION I - LITIGATION STATEMENT ▪ Litigation Statement .................................................................................................................. I-1 SECTION J - FORMS AND ATTACHMENTS ▪ Required Forms ........................................................................................................................ J-1 ▪ Project Verification Form .......................................................................................................... J-2 o Project Summaries ........................................................................................................... J-3 ▪ Section 6 Respondent Submittal Forms ................................................................................. J-6 ▪ Acknowledgement of Addenda ................................................................................................ J-7 ▪ Respondent Submittal Form .................................................................................................... J-8 ▪ Non-Collusion Affidavit ........................................................................................................... J-10 ▪ Public Entity Crimes ................................................................................................................ J-11 ▪ Equal Opportunity / Affirmative Action Statement ............................................................... J-13 ▪ Conflict of Interest Statement ................................................................................................ J-14 ▪ Dispute Disclosure Form ........................................................................................................ J-15 ▪ Anti-Kickback Affidavit ............................................................................................................ J-16 ▪ Contractor Anti-Boycott Certification ..................................................................................... J-17 ▪ Proof of Current Certificate of Insurance .............................................................................. J-18 B | Page 1 S e c t i o n C C o v e r L e t t e r a n d E x e c u t i v e S u m m a r y CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION C - COVER LETTER AND EXECUTIVE SUMMARY September 4, 2018 Office of the City Clerk City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RE: CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS REQUEST FOR QUALIFICATIONS NO. 18-08-01 Dear Selection Committee Members: In response to the City of Sunny Isles Beach’s request for qualifications seeking a qualified consulting firm for services identified in the RFQ titled, “Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements”, Craven Thompson and Associates, Inc. (CTA) is pleased to submit this Statement of Qualifications for your consideration. This project requires a clear understanding of the process for undergrounding of overhead utilities and familiarity with the nuances of neighborhood improvement projects. The project will be done in two phases, the first being installation of conduit and equipment pads, the second, conversion of services. Installation starts with creating a base file that clearly identifies existing services and features of the neighborhood. It will include overhead and surface mounted equipment, storm sewer, sanitary sewer, domestic watermains, natural gas lines, electrical distribution lines, communication lines, cable lines, street lighting, landscape, property lines, and easements. In addition, because properties are currently fed from the rear yard, modified to feed from the front, the siting of transformers will need to consider the routing of individual services across private properties back to existing meters. Once collected, the information will be used to interface with the various utility providers. Designs and criteria will be solicited from each utility. Once provided, the designs from each individual utility will be overlaid and coordinated into a single conduit and equipment plan meeting the needs of all utilities. Along with the underground conversion, we will address street lighting, stormwater improvements, and restoration of landscape and improvements impacted by undergrounding efforts, both within public right-of-way and on private properties. Existing rear yard water services and front yard sanitary laterals will be considered in proposed design but will remain as currently located. Services provided include: program planning and management; liaison services with neighborhood residences, elected officials, and staff; easement preparation; coordination of electrical, CATV, and telecommunications designs by others; bid document preparation; the evaluation of the contractor; construction administration services; review of project as-builts and certification; supplemental engineering services; surveying; lighting: landscape: and C | Page 1 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION C - COVER LETTER AND EXECUTIVE SUMMARY stormwater design. In addition, we will be responsible for seeking approvals and permits from all agencies having jurisdiction. CTA will commit the personnel and resources necessary to perform these services on time and within budget. Authorized Agent of Firm Patrick J. Gibney, P.E. Vice President, Engineering Craven Thompson & Associates, Inc. 3563 NW 53rd Street Fort Lauderdale, Florida 33309 Phone: (954) 739-6400 Email: pgibney@craventhompson.com Proposed Project Manager: Tim J. Hall, P.E. Senior Supervising Engineer Craven Thompson & Associates, Inc. 3563 NW 53rd Street Fort Lauderdale, Florida 33309 Phone: (954) 739-6400 Email: thall@craventhompson.com Our project manager for this program will be Tim Hall, P.E. In addition to his 30 years of general experience (25 in South Florida) he has specific knowledge and experience with the undergrounding efforts throughout the City of Sunny Isles Beach. In addition to orchestrating the ongoing undergrounding efforts along Collins Avenue, he has been instrumental in coordinating undergrounding efforts for four separate single-family home communities in Fort Lauderdale, and commercial applications for the Seminole Tribe of Florida. Motivated by a good challenge, Mr. Hall is very comfortable with running large-scale projects and is well acquainted with the specific requirements and nuances of undergrounding projects. CTA has designed over six thousand (6,000) acres of neighborhood revitalization projects, primarily for utility relocation and stormwater improvements, but including related aspects such as roadway design, right-of-way restoration, traffic calming, linear parks and monuments, driveway harmonization, swale regrading sidewalk installation, ADA improvements, and landscaping, irrigation, and hardscape. We have taken these projects from the planning stages, through design, permitting and bidding, through construction management and certification. We have extensive experience, knowledge and insight into the public outreach/community relations aspects of these types of projects as we provided these services on all of our neighborhood revitalization projects. CTA is currently under contract for a number of projects with multiple clients. In 2017, CTA was at a company-wide utilization rate of 66%. The business plan target composite utilization rate for the company was 75%. The targeted rate accounts for holiday, vacation, marketing, administration, illness, and other non-billable time. CTA employs a very small yet efficient number of administration personnel which contributes significantly to reducing our costs. Our projected workload will ramp-up slightly above the current level for the next six to twelve months but we anticipate a company-wide utilization of approximately 70% to continue beyond that as work shifts between survey, design, and construction phase services. Based on our current and projected workload, the City of Sunny Isles Beach can be C | Page 2 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION C - COVER LETTER AND EXECUTIVE SUMMARY assured that CTA will provide the staff and resources required to provide the necessary services on time and within the budget. The staff listed in this proposal was chosen based on their availability to be able to move forward immediately for this project. We sincerely appreciate the opportunity of providing this response to the City of Sunny Isles Beach and hope to have the opportunity to demonstrate our skills to you. Sincerely, CRAVEN THOMPSON & ASSOCIATES, INC. PATRICK J. GIBNEY, P.E. Vice President, Engineering PJG/tg C | Page 3 S e c t i o n D P r o j e c t A p p r o a c h a n d U n d e r s t a n d i n g CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION D - PROJECT APPROACH AND UNDERSTANDING PROJECT APPROACH AND UNDERSTANDING OF UNDERGROUNDING Introduction Undergrounding projects, by their nature, have unique characteristics that make them unlike other infrastructure projects. For a successful project, it is crucial to understand the process and what’s needed to implement. They involve integration of separate designs from multiple entities, each with their own concerns and criteria, into a cohesive plan that serves the community with minimal disruption. Many undergrounding projects never get off the ground due to funding. Even when funded by special assessment, public money is generally required to advance design to the point where the assessment methodology and assessment role can be compiled. The Utility providers have little incentive for undergrounding. From their perspective, undergrounding projects represent the replacement of perfectly good systems funded by them, with alternative systems funded by others. Although, the utilities benefit by way of reduced maintenance and storm-repair costs, the savings typically don’t justify the cost of rebuilding distribution systems. As a result, the customer assumes the cost rather than the utility providers. Other issues such as replacing lighting (most lighting is mounted on power poles), acquisition of easements, potential relocation of existing utilities, restoration of hardscape/landscape, and potential impact to private services drive costs up. At the same time, this presents opportunities for right-of-way improvements and potential upgrades for the utility providers. Although, the overhead poles are typically owned by FPL through pole agreements, other franchise utilities use them as well. Although, the primary focus is on FPL, undergrounding involves outreach to each utility followed by design and coordination of individual requirements into a cohesive underground distribution plan. Project Definition After confirming the limits of the project, the stakeholders and roles will be defined. An immediate assessment of existing conditions and available data will be initiated in conjunction with meetings with the City, FPL and the various utilities. Other projects (anticipated or on-going) will be identified so as not to conflict and/or cause extended disruption to residents. Phasing will be determined to coincide with funding sources, sequencing, and availability of design. Agreements for design services with each franchise utility will be executed. Utilities will be solicited, as-builts collected, and survey of right-of- way and properties performed. Based upon the parameters identified, a schedule will be prepared and budgets refined. Program needs for public involvement and coordination with utilities will be clarified. D | Page 1 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION D - PROJECT APPROACH AND UNDERSTANDING With any undergrounding project, decisions need to be made up-front to define the extent of the project. One such decision is how to account for private services (from transformer to meter). These may involve a simple reconnection of an existing underground service, others will require undergrounding of existing overhead services across private properties. With this project, the majority of services are in the rear yards. This poses accessibility and restoration issues, but also introduces potentially more complex reconnections; transformers in the front yard and meters likely in the back. Not only do these need to be identified for budget purposes, being that improvements will be made on private property, legal and programmatic logistics need to be understood. Another initial decision will be whether to allow for pad mounted equipment and switchgear within the right-of-way. In doing so, the burden to obtain easements on private properties can be minimized. Conflicts with other projects need to be considered. Consideration for other improvements such as utility replacement, right-of-way restoration, pedestrian-ways, drainage or landscape improvements could directly impact the project. Parameters of “other” projects must be vetted with impacts to timing, budget, and phasing considered. Design Once base information has been collected and parameters defined, design efforts can begin. Most of the efforts will be coordinating the independent designs of the franchise utilities. Starting with FPL, the needs of each utility will be considered and ultimately consolidated into a single set of construction documents. Separate phasing, back-feeding, easements, above grade equipment, overhead services, feeders, and potential pedestrian/vehicular conflicts will be considered as well as constructability and disrupt ion to residents. Location of proposed equipment and existing services will be roughed-out, with the intent of minimizing easement acquisitions. Lighting needs will be considered where removal of existing FPL poles results in elimination of existing lighting. Other improvements such as landscape, drainage, resurfacing, or potential redevelopment will be incorporated into designs. Agencies with jurisdictional permit review will be contacted and requirements confirmed. Budgets will be refined to reflect additional information and refinement of plans. Assuming private service connections are included as part of the project rather than an obligation of the homeowner, they will be factored into the design and bid documents. Construction documents need to be comprehensive with flexibility to account for unique restoration requirements on private properties. In the case where equipment is required, D | Page 2 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION D - PROJECT APPROACH AND UNDERSTANDING easement locations within private properties can be controversial. In consolidating designs, we look to coordinate the needs of individual utilities while minimizing size and locations of easements on private properties. Interaction with residents will be crucial. Public involvement combined with a clear course of action and concise answers will be necessary to gain buy-in and commitment. Bid and Award As design is completed, permits issued, and easements acquired, construction documents and specifications will be compiled into the Bid Package. The Bid Package will include final utility design and specific requirements of franchise utilities, including requirements for work be performed by an approved FPL contractor. Upon receipt, bids will be evaluated with recommendation for award. Construction will consist of installing empty conduits, manholes, pull-boxes, and equipment pads. Pulling services is viewed as a separate task by FPL and can either be incorporated into the bid or left with FPL and other franchise utilities. Further discussion and coordination with utilities is required to determine a preferred alternative. Once the underground system is energized, conversion and removal of exiting overheads will be performed by each of the utilities. As with any project, a complete bid package is essential to ensure project is done within budget constraints. This is especially true for projects done through special assessment. Construction Aside from providing periodic inspection services, because of the level of interaction with the community, the construction representative will serve as liaison to the public; readily accessible and answerable to concerns. It is important to certify compliance with plans and specifications, especially if done as a special assessment but also for permitting agencies. Construction services will be more involved than with a typical infrastructure project and will require closer coordination and administration of construction activities. Construction will need to be monitored and coordinated so as to minimize disruption to residents. Clear and consistent Public notice and a means to receive residents’ concerns will be necessary throughout the construction phase. Conversion After underground is in place (lines pulled and equipment energized) the conversion of overhead services can begin. Similar to construction, this will have its own set of unique challenges and require a well-coordinated effort among the various utility providers with. Because FPL tariffs tie credit for fee reductions to full conversion, conversions must take D | Page 3 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION D - PROJECT APPROACH AND UNDERSTANDING place in a timely manner. Assuming private services (from transformers to customer’s meter) are included within the undergrounding project, overhead meter cans need to be replaced to accommodate underground feeds. In replacing meters, code may require that deficient panels within individual homes be upgraded resulting in an additional expense to private properties. Conversion in and of itself will have logistical issues. Switch over of services needs to be coordinated for each of the utility providers. Conversion of multifamily and commercial services are more complex than single residences. Until all existing overhead utilities have been removed, the existing poles must remain. Because the utilities are not set-up for replacing entire infrastructures, without an agreement committing proper resources to conversion, the poles could remain for a prolonged period of time. Careful planning is required to coordinate removal of all services and poles. Where lighting is mounted on existing poles, pole removal will be coordinated with installation of new lighting. Similarly, where in conflict with proposed lighting, removal of existing overheads may be required. These items need to be understood and accounted for in the initial programing of the project. PROJECT SPECIFIC APPROACH In addition to undergrounding, this project will include minor upgrades to the existing stormwater collection system. The intent will be to improve the stormwater collection in conjunction with the ongoing upgrades to the existing stormwater pump station located in the northwest corner of the neighborhood. Streetlights are sparse and inadequate. New decorative lights will be installed to increase lighting on the streets and pedestrian ways. With relocation to front yards, service to new lights will be easier served. Although within easements, rear yard services pose difficulties for conversion. In many cases, encroachment from fences, sheds, landscape, and other improvements from the individual private property owner’s needs to be dealt with. Because of the type of equipment required, removal of poles after conversion can also be difficult, especially given the proximity of existing water services to remain. D | Page 4 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION D - PROJECT APPROACH AND UNDERSTANDING Each property will require an individual service to be run from the new transformers located within the right-of-way to the existing point of service. Depending upon the location of the existing point of service, running the new service could involve additional restoration costs on private properties. The City’s level of responsibility for level of restoration needs to be considered in defining the project scope. FPL TARIFF PROGRAM The FPL Tariff Program outlines how undergrounding projects are paid for. The two key components are the Contribution-In-Aid-of-Construction (CIAC) and the Government Adjustment Factor (GAF). The CIAC is the amount the applicant (in this case the CRA) pays FPL for undergrounding, the GAF is the credit given when the applicant is a recognized Government Agency. The CIAC calculation is somewhat complicated. Additionally, the numbers used in the calculation are populated entirely by FPL. The calculation first looks at the difference between the cost of a new underground system compared to a new overhead system (reflects upgrade provided to FPL from overhead to underground). The value of the existing system and the cost to remove is added (reimbursement to FPL for the existing improvements). The salvage value from removal of the existing system is deducted (salvage puts money back in FPL’s pocket) and the operating costs over a 30-year period calculated at net present value is added. From these numbers, a subtotal is derived. Depending upon the project pole-miles, a percentage of the subtotal gets deducted to account for the projected savings in storm restoration costs provided by undergrounding over a 30-year period (because this is a Tier 3 project, the deduction is only 5%). Because of the way these values are derived, it is possible that the CIAC is higher than the estimated cost of the underground improvements. The GAF waiver is more straight-forward. The waiver is a total of two parts: 25% of the calculated CIAC, and 75% of the value calculated for storm restoration costs. The GAF waiver will be more than 25% but likely less than 30%. This discount applies only to FPL services. If the applicant installs the facilities, then GAF will be calculated from the adjusted CIAC. FPL provides the GAF to encourage undergrounding programs to be done under public entities. FPL can’t drop the overheads until all services have been re-fed from undergrounds. Service reconnections typically involve private entities. With the agreement , FPL puts the obligation for conversion on City/CRA. If all services not converted in timely manner, creating a situation of where FPL is operating a duplicity of services, FPL fines the City. Note that the tariff applies only to FPL. Other utilities will require agreements, design fees, and payment for reconnecting services as well. D | Page 5 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION D - PROJECT APPROACH AND UNDERSTANDING CONCLUSION Undergrounding requires significant coordination between FP&L, low voltage utilities, and the stakeholders, both private and public. It requires an understanding of technical requirements of the individual utilities applied to the physical limitations of constructing within the right-of-way and impacts to individual residents. It requires a clear understanding of procedure, effective communications, identification of stakeholders, coordination of utility designs, understanding FP&L tariff requirements, cost estimates, and where applicable an understanding of special assessment procedures and requirements. D | Page 6 S e c t i o n E Q u a l i f i c a t i o n I n f o r m a t i o n a n d A s s i g n e d P e r s o n n e l CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL QUALIFICATION INFORMATION For over fifty-six (56) years Craven Thompson & Associates, Inc. (CTA) has provided consulting services to governmental agencies throughout South Florida. In the past ten (10) years we have provided some or all of the following services to numerous municipalities and governmental agencies including: civil engineering, surveying, G.I.S., landscape architectural and construction management services. These entities include: ▪ City of Greenacres ▪ City of Boca Raton ▪ City of West Palm Beach ▪ City of Lake Worth ▪ City of Dania Beach ▪ City of North Lauderdale ▪ City of Hallandale Beach ▪ City of Sunrise ▪ City of Plantation ▪ City of Lauderdale Lakes ▪ City of Fort Lauderdale ▪ City of Hollywood ▪ City of Pompano Beach ▪ City of Oakland Park ▪ City of Coconut Creek ▪ City of Coral Springs ▪ City of Deerfield Beach ▪ City of Lauderhill ▪ City of Miramar ▪ City of Margate CRA ▪ City of Miami Gardens ▪ City of Miami Springs ▪ City of North Miami ▪ City of North Miami Beach ▪ City of Miami Beach ▪ City of Aventura ▪ Town of Lauderdale-by-the-Sea ▪ Town of Davie ▪ Town of Lake Park ▪ Broward County Highway Construction and Engineering Division ▪ Broward County Water and Wastewater Services ▪ School Board of Broward County ▪ Port Everglades ▪ Central Broward Water Control District ▪ Tindall Hammock Irrigation and Soil Conservation District ▪ Tri-County Commuter Rail Authority We have a successful track record in providing infrastructure survey, studies, design, permitting and construction related services to numerous municipalities and governmental agencies. EXPERIENCE CIVIL ENGINEERING At CTA we offer a wide range of civil engineering capabilities that we coordinate with our planners, surveyors, landscape architects and G.I.S. specialists, to provide a total coordinated project from site evaluation to a completion. We take pride in our ability as "problem solvers". This includes preparing studies, plans, calculations, and specifications, permitting, conducting the necessary public meetings and hearings, bidding projects, coordination with affected private property owners for the construction of the project, inspecting the construction, performing contract administration for the construction, and final certification of the project. E | Page 1 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL Neighborhood Infrastructure Improvements, Roadway Improvements, Stormwater / Drainage Improvements / Water/ Reuse Water / Sanitary Improvements CTA has designed numerous projects which have included water distribution and transmission systems, water services, fire hydrants, deep sewer systems, complex multiple pumping stations, storm drainage, and roadway/right-of-way restoration for neighborhood revitalization projects. Designs have included neighborhood improvements, roadways, sidewalks, ADA improvements, water distribution systems, pumping stations, sanitary lift stations, sanitary collection systems, force main, water quality BMPs, storm drainage, stormwater quality improvements, and stormwater management. We have extensive experience, knowledge and insight in the public outreach, design, permitting, bidding and construction services of major infrastructure projects. Our experience includes hundreds of miles of pipe installation for public entities. Neighborhood Infrastructure Improvements CTA has acted as the prime consultant on all of our neighborhood improvement projects. Many of our large neighborhood projects have included extensive lengths of roadway and right-of-way reconstruction. ▪ The North County Neighborhood Improvement Project, NE Quadrant, Bid Package 9 The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid Package 9 included approximately 152 acres of land between Dixie Highway and Federal Highway, north of Sample Road. Designed improvements included 38,863 linear feet of roadway, 23,000 linear feet of sidewalk, and 14,000 linear feet of swale, 6,560 linear feet of storm sewer, 8,920 linear feet of exfiltration trench and two (2) stormwater control structures, a reuse water distribution system consisting of 22,000 linear feet of 4” diameter, and 1,800 linear feet of 12” diameter main, 57,000 linear feet of domestic water main and 40,000 linear feet of sanitary sewer collection and transmission systems. CTA provided topographic survey, design, permitting landscape architecture, and construction engineering and inspection services. The project was completed in 2012. E | Page 2 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL ▪ The North County Neighborhood Improvement Projects, NE Quadrant Bid, Package 10. The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid Package 10 included approximately 213 acres of land. The project included 47,520 linear feet of roadway reconstruction, and 53,460 linear feet of sidewalk construction. Also included were 15,283 linear feet of swale, 6,508 linear feet of storm sewer, and 8,074 linear feet of exfiltration trench. Several traffic calming devices were designed and constructed as part of this Project. A reuse water distribution system consisting of 32,900 linear feet was constructed on Bid Package 10, as well as approximately 4,740 linear feet of water main, 21 water services, 27,755 linear feet of sanitary sewer collection and transmission lines, and 475 laterals. CTA provided topographic survey, design, permitting landscape architecture, and construction engineering and inspection services. The project was completed in 2013. ▪ The North County Neighborhood Improvement Projects, NE Quadrant Bid, Package 11. The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid Package 11 included approximately 357 acres of land between Dixie Highway and Federal Highway, north of Sample Road in Broward County. The project included over 50,688 linear feet of new roadway construction, sidewalks, driveway aprons, and sodded swales In addition the project included over 14,777 linear feet of new storm sewer, 12,993 linear feet of exfiltration trench, 64,000 linear feet of water main, 553 Water Services (many of these services were moved from the rear of the lot to the front), 49,700 linear feet of reuse water main, 796 reclaimed water services, 43,805 linear feet of gravity sewer main, 750 sewer laterals, lift station, and 1,630 linear feet of force main. CTA provided surveying, civil engineering, landscape architecture and CEI services on the project. The project was completed in 2014. ▪ The North County Neighborhood Improvement Projects, NW Quadrant. The North County Neighborhood Improvement Project (NCNIP) NW Quadrant is a project which includes approximately 650 acres of land between Dixie Highway and I-95, North of Sample Road, Roadway improvements included 115,596 linear feet of roadway, along with 104,637 linear feet of sidewalk, and storm sewer included 17,006 linear feet of pipe, and there were 33,191 linear feet of exfiltration trench. Additionally, the sanitary sewer collection system consisted of 70,783 linear feet of gravity main, 14,253 linear feet of force main, and four (4) lift stations. The water distribution system additions included 86,112 linear feet of watermain and 1,590 water services CTA provided topographic survey, design, permitting landscape architecture, and construction engineering and inspection services. The project was completed in 2012. E | Page 3 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL ▪ The South County Neighborhood Improvement Project The South County Neighborhood Improvement Project (SCNIP) includes approximately 1,400 acres of land between State Road 7 and I-95, south of Pembroke Road. The project included the design, permitting, bidding and construction consisting of 53 miles of roadway, 181,000 linear feet of storm sewer (including exfiltration trench), 140,618 linear feet of water main, 236,226 linear feet of gravity sanitary sewer, and 80 miles of sidewalk. This project also included abandoning in-place and grouting over 50,000 linear feet of existing water main. CTA provided topographic survey, design, permitting landscape architecture, and construction engineering and inspection services on each of these projects. The project was completed 2006. ▪ The Miami Gardens Livable Neighborhoods Improvement Project The Livable Neighborhoods Improvement Project includes approximately 222 total acres of land subdivided among four separate sites; namely Garden Circle, Kings Garden I & II, Kings Garden III and Vista Verde. The project includes: 34,200 linear feet of roadway, 7,840 linear feet of sidewalk, 19,000 linear feet of storm sewer, 151 drainage structures, the regrading of 22,500 linear feet of swales, and the addition of 112 street lights, along with street trees and landscape/hardscape. The project began in 2009 and is continuing at present. Four phases are complete. ▪ The Garden Acres Neighborhood Improvement Project Garden Acres was a single-family residential neighborhood approximately with an area of approximately 24 acres. The new drainage system consists of 4” deep roadway swales, drainage pipes and structures, exfiltration trenches and two controlled discharge points into an existing drainage system located within the NE 6th Avenue right-of-way. The roadway swales help with the storage and convey the runoff from the roadway and the house lots. The swales and exfiltration trenches handle the water quality volume generated by the roadway right-of-way area. CTA analyzed the system using ICPR software. CTA provided design, permitting and CEI services for the project. The roadway restoration consisted of 4,985 linear feet of roadway. The drainage system consisted of 2,136 linear feet of storm sewer, 4,171 linear feet and of exfiltration trench. The project also included major roadway, water and sanitary sewer improvements. The water improvements consisted of 5,591 linear feet of 6” diameter main, and 962 linear feet of 8” diameter main. The sanitary improvements consisted of 7,045 linear feet of 8” diameter sewer, 218 linear feet of 4” diameter forcemain, and 1,044 linear feet of 6” diameter forcemain. Improvements included two lift stations. The project was completed in 2014. E | Page 4 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL Street/Roadway Craven Thompson & Associates, Inc. (CTA) is working on or has recently completed (within the past ten (10) years) the design and permitting of a significant number of roadway projects including: ▪ 6th Avenue South Roadway and Streetscape Improvements, Lake Worth ▪ Floranada Avenue Traffic Calming Improvements, Oakland Park ▪ Davie CRA Parking Areas ▪ NE 5th Avenue Streetscape, Oakland Park ▪ NE 34th Court Complete Streets Project, Oakland Park ▪ NW 38th Street Complete Streets Project, Oakland Park ▪ Miramar Historic Area Complete Streets – Phase II, Miramar ▪ NW 21st Avenue, Broward County ▪ SW 41st Place, Davie ▪ Roadway improvements involving: North M Street, North K Street, North F Street, North J Street, 11th Avenue North, and 15th Avenue North, Lake Worth Additionally, we have just completed the design of intersection traffic calming improvements to the following intersections in 2015 for the City of North Miami: ▪ NW 123rd Street/NW Miami Court ▪ NW 123rd Street/NW 1st Court ▪ NW 139th Terrace/NW 5th Court These roadways included utilities such as sanitary and water, and drainage improvements. In addition, we surveyed, designed, permitted and provided CEI services for hundreds of miles of reconstructed roadway in our Neighborhood Improvement Projects. Stormwater/Storm Sewer/Drainage CTA has prepared master plans, conceptual permits, and studies. We have designed, permitted, bid and managed the construction of thousands of acres of stormwater infrastructure improvements. CTA understands the importance of flood protection measures, as standing water promotes unhealthy conditions as well as inhibits essentials services from accessing the area. Within the past ten (10) years CTA has prepared comprehensive stormwater management plans for the Cities of Aventura, Hallandale Beach, Sunrise, Miami Gardens, Greenacres, the Town of Davie, and the Study Area #1 modification for Pompano Beach. In addition, we are the drainage engineers for Tindall Hammock Irrigation and Soil Conservation District (THISCD), and the E | Page 5 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL Central Broward Water Control District (CBWCD) providing planning, capital improvements costs, design and construction administration services which resolved flooding and environmental concerns for the Cities. CTA has performed major and minor stormwater basin studies and has implemented recommendations of those studies through design, permitting, & CEI of basin-wide improvements. Our stormwater master planning projects include computer modeling using Streamline Technologies ICPR Software as well as PCSWMM, the commercial version of US EPA SWMM5 Software. CTA has used the ICPR for the past twenty (20) years, and utilizes the latest update, V4. We have designed and permitted over 400,000 linear feet of storm sewer and exfiltration trench. These designs have included sustainable practices such as the design of bio-swales, exfiltration trench, tidal backflow devices, STORMCEPTORS, and wetland/retention preserve areas. CTA has recently created the Stormwater Master Plan for the City of Hallandale Beach (2,816 Acres), the Western C-11 Basin Study for the CBWCD (15,952 acres), and for a major portion of the City of Greenacres known as Original Section (250 Acres). These projects included development of scheduled improvements to be implemented over a number of fiscal years to mitigate flooding conditions. We are currently working as the Prime with our sub-consultant, Hazen and Sawyer, on the Comprehensive Stormwater Master Plan for Aventura; and we are a sub-consultant to Hazen and Sawyer (the Prime) on the City of Fort Lauderdale Durrs & River Oaks Neighborhood Storm Water Improvement Implementation Project, and also are in the process of completing the East Basin Study (14,938 acres) for the CBWCD. Water and Sanitary Within the past ten (10) years CTA has completed numerous sections of the Utility Zone Analysis (UAZ) Program (including both water and sanitary sewer), City of Lake Worth Watermain Replacement, City of Hollywood Watermain Replacement, City of Plantation Watermain Replacement, the City of Oakland Park Watermain and Sanitary Replacement, and the Town of Davie Watermain and Sanitary Replacement. CTA has surveyed, designed, permitted, bid and managed the construction of thousands of acres/feet of watermain, sanitary, and lift station infrastructure. E | Page 6 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL The following table demonstrates our extensive experience in the potable water & wastewater design discipline: Governmental Entity Watermain (LF) Sanitary (LF) Forcemain (LF) ROW Rest. (LF) Water Services (EA) Lift Stations (EA) Broward County 690,000 676,000 73,000 700,000 5,000 45 Oakland Park 49,000 7,000 7,000 41,200 800 9 Hollywood 246,000 0 0 123,000 1,500 2 Lake Worth 20,000 0 0 14,300 510 0 Plantation 51,000 0 0 43,500 520 0 North Miami Beach 14,500 0 0 4,600 170 0 Davie 28,000 12,750 3,000 29,800 260 0 Greenacres 1,000 7,500 0 6,400 0 0 TOTAL 1,099,500 703,250 83,000 962,800 8,760 56 CTA has not only designed, permitted, bid and constructed over a million feet of pipe, but we have provided accurate estimating of construction costs which is a critical aspect in appropriating proper funding for these projects. CTA has estimated, on average, construction costs to within 6% of the actual Bid Cost. SURVEYING AND MAPPING Providing Surveying services has been, and continues to be, an important portion of CTA’s business since 1962. Through selection and training of personnel and a program to obtain the best equipment available, we have developed a skilled and technically equipped Surveying Department, capable of conducting almost any type of survey. We are qualified and certified by the State of Florida, Department of Natural Resources, for both horizontal and vertical control for Second Order accuracy. In addition to conventional boundary topographic and construction surveys, we have the experience to provide the latest in 3D Laser Scanning - High Definition Surveying, Geodetic Control, PLSS Retracement, Hydrographic, Cadastral, Photogrammetric Control, Right-of- Way and Construction Surveys. Over the years, we have provided surveying services to over twenty-five municipalities and the following governmental and quasi-governmental agencies, including: ▪ Florida Department of Environmental Protection ▪ Florida East Coast Railway ▪ Florida Department of Transportation ▪ Florida GAS E | Page 7 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL ▪ Port Everglades Authority ▪ Broward County Highway Construction and Engineering Division ▪ Broward County Water and Wastewater Services ▪ Waste Management Inc. ▪ Central Broward Water Control District ▪ Tri-County Commuter Rail Authority ▪ Seminole Tribe of Florida Some of our recent projects include: ▪ Lake Worth 2020 Master Plan Year 1 Improvements Survey ▪ Lake Worth 2” Watermain Replacement Program Phase 2 Survey ▪ Greenacres Original Section Survey ▪ Greenacres Hydrographic Survey ▪ Lake Park Canal Outfall Survey ▪ North Riverside Right-of-Way Survey ▪ Hallandale Beach City-Wide Survey ▪ Plantation Watermain Rehabilitation Route Survey ▪ Apollo Park Survey ▪ Port Everglades Sketch and Legal Descriptions ▪ Broward County Convention Center Boundary Survey ▪ Lauderdale Lakes Canal Cross-Sections ▪ Central Broward Water Control District Canal Cross-Sections ▪ Greenacres 10th Avenue North Intersection and Sanitary Sewer Survey ▪ City of Oakland Park NE 38th Avenue Complete Streets Survey ▪ City of North Miami Survey and Plat Review In addition, CTA’s GIS project experience includes: ▪ Broward County Regional Reuse Water Master Plan through Broward County Natural Resources Department ▪ Fire Hydrant Maintenance Program for the City of Sunrise ▪ City of North Miami Beach Water & Sewer Service Area G.I.S. system ▪ Commercial Stormwater Assessment GIS database for the City of Oakland Park E | Page 8 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL LANDSCAPE ARCHITECTURAL SERVICES The Landscape Architecture Department at CTA was created in 1985 when its first Registered Landscape Architect joined the team. The Landscape Architecture Department was created in response to increased public and private concern for natural systems, environmental quality and community appearance. CTA has been actively engaged in Landscape Architecture ever since, resulting in hundreds of impressive landscape architectural projects in South Florida. Our Landscape Architects are readily available to provide services to conduct site planning for the initial conceptual planning stages of a project, as well as the landscape, hardscape, site amenity and irrigation plans. CTA has designed many projects within the tri-county area, including complete streets, streetscape, parks, median beautification, traffic calming, and irrigation design. Aesthetic features, such as street lights, trees, berming, shrubs and other landscaping can contribute to the unique character of a street and assist in mitigating resident concerns with regards to traffic, noise, and security concerns. Within the past five (5) years, CTA has completed two complete streets projects in Oakland Park (NE 34th Court & NE 38th Street) and are currently designing the Miramar Historical Area Complete Streets Project – Phase II. Recently, we also developed the Bicycle/Pedestrian Greenways & Trails Master Plan for the City of Sunrise. CTA has also finished a number of streetscape and traffic calming projects including: NE 5th Avenue Streetscape & Reconstruction; 6th Avenue South Streetscape; North Miami Roadway Intersection Traffic Calming (3 intersections); the Floranda Road Traffic Calming Project; and we are nearing completion of the NE 14 th Avenue Streetscape Project. CTA median beautification projects include: Oakland Park Boulevard Median Beautification; Powerline Road Median Enhancements; and we are working on the Miramar Parkway & Miramar Boulevard Median Enhancements. Our experience also includes the Miami Springs Citywide ADA Ramp Improvements, and the Hallandale Beach CDBG Sidewalk Improvements Project. Our experience includes many additional roadway and landscape architectural projects over the past five (5) years. CTA designed approximately seventy (70) miles of Greenways in Broward County. These included the C-14 Canal/Cypress Creek Greenway, New River/SR 84 Greenway, Flamingo Road Trail, Dixie Highway/FEC Trail and Griffin/Orange Drive Greenway. Many of our other projects include master plans, design, permitting and construction services for streetscapes, median landscaping and hardscape, right-of-way enhancements, active and passive parks, E | Page 9 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL recreational amenities for upscale residential projects, landscape and hardscape for libraries, community centers, fire stations, city halls, and urban redevelopment throughout South Florida. CTA’s active park design, permitting, and construction experience involves preparing design documents that include sports fields, path systems, exercise trails, vehicular circulation, stormwater detention, play areas, visitor facilities and interpretive signage. Our passive park projects incorporate elements, including a number of nature trails, picnic areas, and gathering spaces that take advantage of existing natural features. Passive parks can also act as social spaces for people to interact. The maintaining of natural green space is not only environmentally important, but moreover, is much less costly from a maintenance perspective. Recently completed or current park projects include: Bluesten Park, Sawgrass Sanctuary Park, Pine Island Road & NW 50th Street Athletic Complex, Oak Hammock Park, Oscar Wind Park, Flamingo Park, the Urban Art Park, Jaco Pastorius Park, and Waterways Park. Our landscape architects create master plans, designs for public facilities such as libraries, community centers, city halls and other municipal facilities that promote the building architecture and emphasize the character of the surrounding neighborhood. We consider that a building is not an invasion of the landscape, but a vital extension of it. Where a building rests on the land, and how it rests on the land, sets the context for its evolving construction, development, and use. We have designed a number of right-of-way landscaping and traffic calming projects in the South Florida area. Aesthetic features, such as street lights, trees, berming, shrubs and other landscaping, can contribute to the unique character of a street and assist in mitigating resident concerns with regards to traffic, noise, and security concerns. CONSTRUCTION ENGINEERING & INSPECTION CTA has extensive experience with Construction Administration Services such as Reside nt Project Representative Services, and Construction Inspection Services, and various other services during construction of improvements. Our services include inspections, progress meetings, reports, pay request processing, change order negotiation and processing, and all other aspects involved in providing Resident Project Representative Services to our Clients. CTA has provided Construction Administration services for over 6,000 acres of infrastructure replacement / rehabilitation for the past twenty-five (25) years. CTA’s vast wealth of experience in Construction Administration for Neighborhood Redevelopment Improvement Projects in both suburban and urban settings is unrivaled by any firm in South Florida. Our Construction Management Department has provided these services to Private and Public clients with great success in the past and moving into the future. E | Page 10 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL Sub-Consultants Hillers Electrical Engineering – Electrical Engineering & Lighting Contact: Mr. Paul Hillers, P.E., President 23257 State Road 7, Suite 100 Boca Raton, Florida 33428 Phone: (561) 451-9165 Email: phillers@hillersee.com Company Overview: Hillers Electrical Engineering, Inc. (HEE) has been in business since 1994 and is located in Boca Raton, Florida. Hillers Electrical Engineering, Inc. brings over 200 years of unsurpassed experience, expertise, and personalized service in electrical engineering design, control application programming, and construction management. HEE specialize in electrical engineering design and control application programming. Our electrical design services include power, control, instrumentation, telemetry for major air carrier and general aviation airports, DOT roadway systems, water and wastewater treatment facilities, multi-sports complexes, storm water pumping and control structures, fueling systems and seaport storage and handling facilities for federal, state, county and municipal agencies, as well as private owners. We have over 115 years of collective electrical design and project management experience on a variety of projects, ranging from small $2,500 projects to over $50 million in cost. KAMM Consulting - Mechanical Engineering Contact Information: Mr. Art Kamm, P.E., President 1407 West Newport Center Drive Deerfield Beach, Florida 33442 Phone: (954) 949-2200 Email: art@kammconsulting.com Company Overview: KAMM Consulting, Inc. has extensive experience in the design of modern HVAC systems ranging from complex commercial/industrial applications utilizing state of the art technologies to sophisticated residential systems. Indoor air quality (IAQ) concerns and the ongoing drive for efficient energy utilization are major factors in their designs. Their HVAC engineers are expert in the broad range of climatic and building conditions that impact the performance of a design. Their experience in South Florida uniquely qualifies Kamm Consulting for this market. They use state-of-the-art software and methods to perform heat load and energy calculations. ✓ Site Evaluation and Planning ✓ Reliability Studies ✓ Point-of-failure Analysis ✓ Relocation Evaluations ✓ Merger / Consolidation Studies ✓ Mechanical HVAC Design ✓ Electrical Design ✓ Uninterruptible Power Design ✓ Back-up Standby Power Design ✓ Fire Protection Engineering ✓ Voice and Data Communications Design ✓ LEED® design services E | Page 11 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL InfraMap Corp. - Subsurface Utility Locates Contact Information: Mr. Andres Garcia, Utility Location Manager, ULM 1860 Old Okeechobee Road, #201 West Palm Beach, Florida 33409 Phone: (561) 586-0790 Email: agarcia@Inframap.net Company Overview: InfraMap is a leading provider of Utility Infrastructure Mapping and Subsurface Utility Engineering (S.U.E.) services. InfraMap collects utility infrastructure data in the field using sophisticated geophysical techniques and instrumentation (including GPR), with automated data collection gear and state of the art survey equipment. InfraMap then merges this information onto their client’s base mapping in their desired format. They collect and present this data to aid their clients in reducing the design and construction cost of major infrastructure projects. Founded in 1987, InfraMap is a utility infrastructure mapping specialist. Their clients are State and Local Transportation Departments, Airports, Port Authorities and Utilities. InfraMap has performed some of the largest utility mapping projects ever undertaken by any firm. InfraMap has the resources to perform and deliver multiple large-scale projects on time, throughout the United States, as evidenced by their past and recent performance. Absolute Civil Engineering Solutions – Geotechnical & Testing Contact Information: Ms. Tiffany Leal, President 4121 SW 47th Avenue, Suite 1319 Davie, Florida 33314 Phone: (954) 349-8797 Email Address: tleal@absoluteces.com Company Overview: Absolute Civil Engineering Solutions (ACES) is a Certified M/WBE firm offering a full range of engineering and testing services from pre-construction through post- construction. On a daily basis, ACES provides consulting services to both the private and public sector, including: owners, developers, architects, general contractors, property management companies, school boards, Departments of Transportation and municipalities. At ACES, they are focused on knowing their Clients’ project goals, helping create cost savings and communicating effectively. As ACES progresses through their work assignments, they continually keep their clients updated on project findings. ACES is communication oriented, with positive, action-oriented attitudes. The mission of ACES’ principals is to continue growing a geotechnical, environmental and construction materials testing consulting firm that listens to their Clients, develops a clear understanding of their Clients’ needs and goals, and tailors its services to meet those needs in a quality, timely, and cost - effective manner. Simply stated, ACES’ goal is to be the leader in their profession and to set the standards that other consultants in their industry strive to obtain. Based on feedback from their Clients, ACES has and continues to meet and exceed their expectations. The E | Page 12 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL people who makeup ACES are truly some of the best engineers and technical professionals in the industry. Experience, technical ability and commitment to Client service from each and every staff member of ACES are the simple secrets to their success. Masuen Consulting - Irrigation Designers Contact Information: Ms. Michele Masuen, President 32801 Highway 441 N. #293 Okeechobee, Florida 34972 Phone: (866) 928-1533, Extension 114 Email: michele@masuenconsulting.com Company Overview: Masuen Consulting LLC, is an Outdoor Water Management and Sustainability Consulting firm comprised of landscape architects, horticulturalists, agronomists, agricultural engineers, water resource engineers, environmental engineers, irrigation designers, landscape designers, site planners, and construction/project managers. The firm is dedicated to providing clients with services focused on water conservation, resource & cost sustainability, operational efficiencies, regulatory compliance, and exemplary service. Everything Masuen Consulting LLC delivers is the result of a critical thinking, ‘out of the box’, oriented mindset guided by a senior management team with over eighty-five (85) years of combined experience in the landscape, golf, government, and agricultural industries. The consulting firm was created with the sole focus of bringing science based, field verified solutions to the Landscape, Golf, Government, and Agricultural marketplaces. As industry professionals with expertise in soils, plants, water, hydraulics, design theory, water shed analysis and management, and construction/project management, we develop and implement successful ‘holistic’ outdoor water management solutions to meet each client’s unique needs. Masuen Consulting has been providing proven solutions to real world problems in the outdoor water management and sustainability arenas for almost twenty (20) years. The company consists of three divisions; 1) Design, 2) Technical Consulting and 3) Water Management. Masuen Consulting, LLC offers its services throughout the United States and overseas. Masuen has offices in Florida, Georgia, Texas, and Washington State. E | Page 13 STANDARD FORM 330 0ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA), Sunny Isles Beach, Florida 2. PUBLIC NOTICE DATE August 10, 2018 3. SOLICITATION OR PROJECT NUMBER RFQ No. 18-08-01 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Patrick J. Gibney, P.E., Vice President, Engineering 5. NAME OF FIRM Craven Thompson & Associates, Inc. 6. TELEPHONE NUMBER (954) 739-6400 7. FAX NUMBER (954) 739-6409 8. E-MAIL ADDRESS pgibney@craventhompson.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PR I M E J -V P A R T N E R SU B C O N - TR A C T O R a. X Craven Thompson & Associates, Inc. S CHECK IF BRANCH OFFICE X , Inc. 3563 NW 53rd Street Fort Lauderdale, Florida 33309 Land Surveying, Utility Coordination, Easement Preparation, Public Information Support, Permitting, Project Evaluation & Approach, Highway & Civil Engineering, Landscape Architecture, Program Management, Cost Estimates, Utility Negotiations, Construction Review & Administration. Bid Document Preparation / Review / Evaluation b. X Absolute Civil Engineering Solutions, LLC CHECK IF BRANCH OFFICE 4121 SW 47th Ave., Suite 1319 Davie, Florida 33314 Geotechnical Engineering and Testing c. X Hillers Electrical Engineering, Inc. CHECK IF BRANCH OFFICE 23257 State Road 7, Suite 100 Boca Raton, Florida 33428 Electrical Engineering & Lighting d. X Masuen Consulting, LLC CHECK IF BRANCH OFFICE 32801 Highway 441 N., #293 Okeechobee, Florida 34972 Landscape Irrigation Design e. X Kamm Consulting CHECK IF BRANCH OFFICE 1407 West Newport Center Drive Deerfield Beach, Florida 33442 Mechanical Engineering f. X InfraMap Corp. CHECK IF BRANCH OFFICE 1860 Old Okeechobee Road West Palm Beach, Florida 33409 Sub-Surface Utility Locates D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) E | Page 14 STANDARD FORM 330 PART I - CONTRACT-SPECIFIC QUALIFICATIONS D. Organizational Chart of Proposed Team PROJECT MANAGER Tim J. Hall, P.E. LEAD LANDSCAPE ARCHITECT Joseph D. Handley R.L.A. CONSTRUCTION MANAGEMENT/ADMINISTRATION Don Shaver LEAD SURVEYOR Richard D. Pryce, P.S.M. IRRIGATION DESIGN Judy Jensen GEOTECHNICAL ENGINEERING & TESTING Wayne Webb, P.E. ELECTRICAL ENGINEERING & LIGHTING James Kappes, P.E. Amy Champagne-Baker, P.E. PRINCIPAL-IN-CHARGE Patrick J. Gibney, P.E. CIVIL ENGINEERING Douglas Taylor, P.E. Matthew Cigale, P.E. MECHANICAL ENGINEERING Art Kamm, P.E., CxA, LEED AP Mircia Pella, P.E., LEED AP SUB-SURFACE UTILITY LOCATES Andres Garcia, ULM E | P a g e 1 5 STANDARD FORM 330 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Patrick J. Gibney, P.E. 13. ROLE IN THIS CONTRACT Principal-In-Charge 14. YEARS EXPERIENCE a. TOTAL 31 b. WITH CURRENT FIRM 25 15. FIRM NAME AND LOCATION (City and State) Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 16. EDUCATION (DEGREE AND SPECIALIZATION) Rutgers, The State University, Bachelor of Science, Civil Engineering (1987) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer - Florida No. 49428 (1995) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Civil Engineers 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Original Section Drainage Improvements Greenacres, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 - 2015 CONSTRUCTION (If applicable) 2016 (Phase I Complete) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Gibney was Project Manager. The project required 4,500 linear feet of drainage pipe, 21,615 linear feet of ditch re-shaping, longs lengths of sidewalk replacement, driveway restorations, and pavement restoration. The Phase 1 project required installation of 500 linear feet of 36” RCP storm pipe, 1,010 linear feet of 24” RCP Storm Pipe, 156 linear feet of 18” RCP Storm Pipe, 156 linear feet of 12”x18” RCP storm Pipe, significant ditch reshaping, sidewalk replacement, and replacement of outfall to LWDD canal. b. (1) TITLE AND LOCATION (City and State) North County Neighborhood Improvement Project, Northwest Quadrant, Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Manager for roadway improvements included 115,596 linear feet of roadway, along with 104,637 linear feet of sidewalk, and storm sewer included 17,006 linear feet of pipe, an d there were 33,191 linear feet of exfiltration trench. c. (1) TITLE AND LOCATION (City and State) North County Neighborhood Improvement Project, NE, Quadrant, Bid Package 10, Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Manager – The project consisted of approximately 213 acres of land. It included 47,520 linear feet of roadway reconstruction, and 53,460 linear feet of sidewalk construction. Also , included were 15,283 linear feet of swale, 6,508 linear feet of storm sewer, and 8,074 linear feet of exfiltration trench. d. (1) TITLE AND LOCATION (City and State) North County Neighborhood Improvement Project, NE, Quadrant, Bid Package 11, Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The project included over 50,688 linear feet of new roadway construction, sidewalks, driveway aprons, and sodded swales. In addition, the project included over 14,777 linear feet of new storm sewer, 12,993 linear feet of exfiltration trench, 64,000 linear feet of water main, 553 Water Services. e. (1) TITLE AND LOCATION (City and State) North Central County Neighborhood Improvements Project Broward County Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION (If applicable) 2012 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Manager. This consisted of approximately 21 miles of roadway, 28,359 linear feet of sanitary lines, 21,308 linear feet of watermain, and 17.5 miles of sidewalk. North Central County Neighborhood Improvement Project includes approximately 945 acres of land located generally between Sunrise Boulevard, NW 26 th Street, Interstate 95 and the Wingate Canal in Broward County, Florida. E | Page 16 STANDARD FORM 330 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Timothy J. Hall, P.E. 13. ROLE IN THIS CONTRACT Project Manager 14. YEARS EXPERIENCE a. TOTAL 31 b. WITH CURRENT FIRM 11 15. FIRM NAME AND LOCATION (City and State) Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 16. EDUCATION (DEGREE AND SPECIALIZATION) University of Maryland (Structural Emphasis, Bachelor of Science, Civil Engineering (1987) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer - Florida No. 50588 (1996) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) City of Sunny Isles Beach, Utility Undergrounding, Sunny Isles Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project lead for the City of Sunny Isles Beach undergrounding efforts. Project included undergrounding of overhead electrical, telephone, and cable within 2.1 miles along Collins Avenue (A1A). Significant coordination required between FP&L, low voltage utilities and FDOT requirements. Understanding of technical requirements and restrictions of both FDOT and utilities required to deal with the limitations of constructing within the right-of-way. b. (1) TITLE AND LOCATION (City and State) Fort Lauderdale, Undergrounding of Utilities Continuing Services, Fort Lauderdale, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm In 2009, the City awarded the general services contract to assist in facilitating the undergrounding of utilities within neighborhood through special assessment. Projects required a clear roadmap of procedure, ability to communicate effectively with residents, coordination of utilities, understanding of FP&L tariff and requirements, assistance in drafting proper ordinance, cost estimates, and understanding of special assessment procedures and requirements. c. (1) TITLE AND LOCATION (City and State) City of Fort Lauderdale - WW2011 Program, Fort Lauderdale, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES September 2003 CONSTRUCTION (If applicable) June 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Lead for design services related to City’s Capital Improvements Program which included approximately $636 million in utilities infrastructure repair, replacement, and upgrades. The program includes analysis, modeling and design for improvements to water and wastewater facilities in meeting a comprehensive plan in response to expanded demand and service areas. d. (1) TITLE AND LOCATION (City and State) North Miami Beach General Consulting Services, North Miami Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 - Present CONSTRUCTION (If applicable) Varies (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Hall has been the project manager for a number of utility projects for the City of North Miami Beach e. (1) TITLE AND LOCATION (City and State) City of Fort Lauderdale - General Engineering Services Contract (2) YEAR COMPLETED PROFESSIONAL SERVICES 2006 CONSTRUCTION (If applicable) 2014 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Coordinator and point of contact for engineering, landscape, survey, and architectural services provided to the City through open-ended contract. In addition to management of multiple projects, responsible for overseeing design, commitment to schedule and meeting budgets for multi-facetted improvement projects. Projects include programs to provide water and wastewater improvements to existing neighborhoods served by septic systems and without adequate fire protection. Areas served include a mixture of single family, multi -family, commercial, office and industrial uses. In addition to utilities, improvements included streetscape, landscape, drainage, roadway re - alignment and traffic calming. E | Page 17 STANDARD FORM 330 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Matthew Cigale, P.E. 13. ROLE IN THIS CONTRACT Civil Engineer 14. YEARS EXPERIENCE a. TOTAL 21 b. WITH CURRENT FIRM 19 15. FIRM NAME AND LOCATION (City and State) Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science, Civil Engineering, Clarkson University, Potsdam, New York (1996) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer - Florida No. 74584 (2012) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Member, American Society of Mechanical Engineers, Computer Skills: AutoCAD, MicroStation, SewerCAD, WaterCAD 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) North County Neighborhood Improvement Project Northwest Quadrant, Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Engineer for roadway improvements included 115,596 linear feet of roadway, along with 104,637 linear feet of sidewalk, and storm sewer included 17,006 linear feet of pipe, and there were 33,191 linear feet of exfiltration trench. b. (1) TITLE AND LOCATION (City and State) Garden Acres Neighborhood Improvements City of Oakland Park, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Engineer responsible for preparation of Contract Documents, Permitting and Construction Management for 25-acre residential infrastructure improvement(s) retrofit within the City of Oakland Park. Services included: roadway design; stormwater design; water distribution system design; wastewater collection & transmission systems design; permitting; bidding assistance and construction administration. c. (1) TITLE AND LOCATION (City and State) North Central County Neighborhood Improvement Project Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION (If applicable) 2012 (Phased) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Engineer. This consisted of approximately 21 miles of roadway, 28,359 linear feet of sanitary lines, 21,308 linear feet of watermain, and 17.5 miles of sidewalk. North Central County Neighborhood Improvement Project includes approximately 945 acres of land located generally between Sunrise Boulevard, NW 26th Street, Interstate 95 and the Wingate Canal in Broward County, Florida. d. (1) TITLE AND LOCATION (City and State) Lake Worth 2020 Master Plan – Year 1 Improvements Lake Worth Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 - 2014 CONSTRUCTION (If applicable) In Progress (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project includes design, permitting, Year 1 of the Lake Worth 2020 Master Plan. The project includes the rehabilitation of right-of-way infrastructure including roads, alleys, curb, sidewalk, hardscape, drainage, and potable water. The project includes over 13,000 linear feet of roadway and storm sewer along with in excess of 6,000 linear feet of water main. e. (1) TITLE AND LOCATION (City and State) North County Neighborhood Improvement Project, NE Quadrant Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION (If applicable) 2014 (Phased) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Engineer assisted in design of project consisting of roadways, alleys, sidewalks, swales, drainage, sanitary sewer and watermain. E | Page 18 STANDARD FORM 330 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Douglas R. Taylor, P.E. 13. ROLE IN THIS CONTRACT Civil Engineer 14. YEARS EXPERIENCE a. TOTAL 34 b. WITH CURRENT FIRM 7 15. FIRM NAME AND LOCATION (City and State) Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 16. EDUCATION (DEGREE AND SPECIALIZATION) University of Illinois (UIUC) Bachelor of Civil Engineering (1984) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer - Florida No. 50569 (1996) Professional Engineer - IL No. 44542 (1988) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) -FEMA ICS 100,200,700,800 - FEMA G300, G400) -Florida Green Building Council -Florida Redevelopment Association APWA 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED LW 2020 Mater Plan Year 1 Improvements Lake Worth, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2013 - 2014 In Progress (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Director. Project includes design and permitting. Year 1 of the Lake Worth 2020 Master Plan. The project includes the rehabilitation of right-of-way infrastructure including roads, alleys, curb, sidewalk, hardscape, drainage, and potable water. The project includes over 13,000 linear feet of roadway and storm sewer along with in excess of 6,000 linear feet of watermain. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami Gardens Livable Neighborhood Improvement Project, Miami Gardens, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2009 - Present 2010 - Present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The Livable Neighborhoods Improvement Project includes approximately 222 total acres of land . The project includes: 34,200 linear feet of roadway, 7,840 linear f eet of sidewalk, 19,000 linear feet of storm sewer, 151 drainage structures, the regrading of 22,500 linear feet of swales, and the addition of 112 street lights, along with street trees and landscape/hardscape. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Eastside Infrastructure Improvements, Phases 2 & 3 Town of Davie, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil Engineer for 18,940 linear feet of storm sewer, the reconstruction of 5.2 miles of roadway. 14,800 linear feet of 6" diameter main, 5,075 linear feet of 8" diameter main, and 5,,140 linear feet of 12" diamete r main, 455 linear feet of 8" diameter sanitary sewer, 40 sanitary manholes and 2,945 linear feet of 16" diameter forcemain. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami Springs City-Wide ADA Ramps Miami Springs, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Taylor assisted with the design and permitting of new and replacement ADA ramps throughout the City. The project is funded through the legislative appropriation process. The project includes field evaluation of intersections throughout the City to determine the location of non-conforming or missing ADA ramps. CTA developed a set of construction plans for installation of the ramps per FDOT standards. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Traffic Calming at the Intersections of 123rd Street & NW 1st Court, 123rd Street & Miami Court, NW 139th Terrace & NW 5th Court, North Miami PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Lead Engineer - The project involved the development of designs for traffic calming features along NW 123th Street and NW 1st Court, NW 123rd Street and NW Miami Court, and 139th Street NW 5th Court in the City of North Miami. These intersections had large expanses of pavement without traffic control and therefore required the implementation of traffic calming features. CTA design elevated intersections, removed pavement and introduced curbing to reduce speeds. E | Page 19 STANDARD FORM 330 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Donald A. Shaver 13. ROLE IN THIS CONTRACT Construction Management 14. YEARS EXPERIENCE a. TOTAL 37 b. WITH CURRENT FIRM 18 15. FIRM NAME AND LOCATION (City and State) Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science - Construction Science Kansas State University, Manhattan, Kansas (1981) Associate in Technical Education, Building Science, Hutchinson Community College, Hutchinson, KS (1978) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) State of Florida General Contractor (Inactive) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) NE/NW 6th Street (Sistrunk Blvd.) Streetscape and Enhancement Project, Fort Lauderdale, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Construction Management services and oversight of Resident Project Representative (RPR) for Sistrunk Blvd. Streetscape and Enhancement Project. The project was funded and managed by the Fort Lauderdale CRA and included streetscape improvements, undergrounding of overhead utilities, landscape, median, paver sidewalk, lighting, drainage and other improvements. Work included close coordination with existing businesses during construction, public relations to keep all parties informed of improvements, maintenance of traffic coordination to ensure access to all affected properties throughout construction and a full time RPR on-site managing the project. The project was federally funded including LAP funding. b. (1) TITLE AND LOCATION (City and State) Miami Gardens Livable Neighborhood Improvements Project Miami Gardens, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 - Present CONSTRUCTION (If applicable) Present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Responsible for Construction Management - The Project includes approximately 222 total acres of land subdivided among four separate sites; namely Garden Circle, Kings Garden I & II, Kings Garden III and Vista Verde. The various project sites are all located within the confines of NW 183rd Street (Miami Gardens Drive), NW 215th Street (County Line Road), NW 47th Avenue, and NW 37th Avenue in the City of Miami Gardens, Florida. c. (1) TITLE AND LOCATION (City and State) Eastside Infrastructure Improvements, Phases 2 & 3 Town of Davie, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Construction Management for 18,940 linear feet of storm sewer, the reconstruction of 5.2 miles of roadway. 14,800 linear feet of 6" diameter main, 5,075 linear feet of 8" diameter main, and 5,,140 linear feet of 12" diameter main, 455 linear feet of 8" diameter sanitary sewer, 40 sanitary manholes and 2,945 linear feet of 16" diameter forcemain. d. (1) TITLE AND LOCATION (City and State) Davie CRA Consulting Services Davie, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2007 - Present CONSTRUCTION (If applicable) Varies (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Shaver is currently serving as the Craven Thompson & Associates ’ Construction Manager for the Davie CRA Engineering Consultant Contract. In this role, he has completed numerous Capital Improvement projects including roadway and drainage improvements; utility rehabilitations; permitting and construction services. e. (1) TITLE AND LOCATION (City and State) South County Neighborhood Improvements Broward county, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2000 CONSTRUCTION (If applicable) 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Construction Manager. Mr. Shaver was responsible for the construction management of major sections of the South County Neighborhood Improvement Project. The project consisted of twelve construction packages with a total construction cost of approximately $70 million dollars. Improvements included water distribution, sanitary sewer, lift stations, force main, storm water improvements and roadway construction. The project included the design, permitting, bidding and construction consisting of 53 miles of roadway, 181,000 linear feet of storm sewer (including exfiltration trench), 140,618 linear feet of water main, 236,226 linear feet of gravity sanitary sewer, and 80 miles of sidewalk. E | Page 20 STANDARD FORM 330 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Joseph D. Handley, R.L.A. 13. ROLE IN THIS CONTRACT Lead Landscape Architect 14. YEARS EXPERIENCE a. TOTAL 35 b. WITH CURRENT FIRM 30 15. FIRM NAME AND LOCATION (City and State) Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 16. EDUCATION (DEGREE AND SPECIALIZATION) Clemson University, B.S. in Ornamental Horticulture (1980); University of Georgia & Louisiana St. University, Master in Landscape Architecture Studies (1984) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Registered Landscape Architect Florida Registration No. 1368 (1990) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) - American Society of Landscape Architects - CPTED Certification (August 1999) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Bicycle/Pedestrian Greenway & Trails Master Plan Sunrise, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Handley was the CTA Principal-in-Charge for the preparation of the Bicycle / Pedestrian Greenways & Trails Master Plan. The Plan defines a system of sidewalks, bike lanes, paths, greenways and trails that provides integrated and continuous corridors for non-motorized transportation and recreation throughout the C ity of Sunrise in a manner that is sensitive to the needs of various user groups, the natural and built environment, the management and maintenance, and potential funding capabilities of local government. b. (1) TITLE AND LOCATION (City and State) Miramar Parkway & Miramar Boulevard Median Enhancements, Miramar, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The project is along Miramar Parkway from the Florida Turnpike to Palm Avenue and along Miramar Boulevard from University Drive to Palm Avenue. The project includes landscaping and hardscape for two main thoroughfares through the City of Miramar. The medians lack aesthetic appeal and require various beautification enhancements. This is Phase I of a multi-phased project. The project requires permitting through the City and Broward County Construction and Highway Engineering Department. c. (1) TITLE AND LOCATION (City and State) NE 34th Court Complete Streets Project, (from NE 2nd Avenue to Dixie Highway), Oakland Park, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 - 2013 CONSTRUCTION (If applicable) 2013 - 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Principal Landscape Architect for the landscape, streetscape and irrigation design for the roadway reconstruction design of approximately 0.60 miles. Estimated Construction Cost: $2.2 Million. d. (1) TITLE AND LOCATION (City and State) North Central County Neighborhood Improvements, Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION (If applicable) 2012 (Phased) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Principal Landscape Architect Preparation of Basis of Design Report, Contract Documents, Permitting and Construction Management for 980-acre retrofit infrastructure and landscape improvements within unincorporated Broward County. e. (1) TITLE AND LOCATION (City and State) Central County Neighborhood Improvements, Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 1996 CONSTRUCTION (If applicable) 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Principal Landscape Architect Preparation of Basis of Design Report, Construction Documents, Permitting and Construction Management for 1,800 acre retrofit infrastructure and landscape improvements within unincorporated Broward County. E | Page 21 STANDARD FORM 330 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Richard D. Pryce, P.S.M. 13. ROLE IN THIS CONTRACT Land Surveying Project Manager 14. YEARS EXPERIENCE a. TOTAL 46 b. WITH CURRENT FIRM 12 15. FIRM NAME AND LOCATION (City and State) Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 16. EDUCATION (DEGREE AND SPECIALIZATION) Associates of Science in Criminal Justice, BCC (1978) Certificate in advanced GIS & Remote Sensing, BCC (2002) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Surveyor and Mapper Florida No. 4038 (1983) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) - Current Director, Broward County Chapter of Florida Surveying Mapping Society, Chairman FSMS GIS Committee - Geographic Land Information Society, Chairman FSMS Anti-theft Committee, American Congress, Surveying Mapping 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) North County Neighborhood Improvement Project, NE Quadrant (Surveying) (2) YEAR COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION (If applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Lead Surveyor providing surveying of right-of-way for Bid Packages 9, 10, & 11 which included; 152, 213, and 357 acres respectively. b. (1) TITLE AND LOCATION (City and State) North County Neighborhood Improvement Project, NW, Quadrant (Surveying) (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Lead Surveyor providing surveying of right-of-way for the Northwest Quadrant which included 650 acres of land in Broward County. c. (1) TITLE AND LOCATION (City and State) Garden Acres Neighborhood Improvement Project (Surveying) Oakland Park, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Garden Acres was a single-family residential neighborhood approximately with an area of approximately 24 acres. This included detailed right-of-way and topographic surveys. d. (1) TITLE AND LOCATION (City and State) City of Miami Gardens General Consulting (Surveying) Services Miami Gardens, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 - Present CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Pryce has managed all survey activities on our general consulting services for Miami Gardens capital improvement projects including roadway and drainage improvements; infrastructure improvements; park projects; street resurfacing; traffic improvement projects; and roadway lighting. e. (1) TITLE AND LOCATION (City and State) North Miami Beach Water and Sewer GIS Project North Miami Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 - 2016 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The purpose of the 25,600-Acre Service Area Project was to provide the City with the complete GIS product of their water and sanitary system. This involved the conversion of the City’s existing water and sanitary sewer infrastructure, from an AutoCAD drawing file format to the industry standard, Environmental Systems Research Institute (ESRI) Geographic Information System (GIS) format. The Project included the entire North Miami Beach Utility service area. E | Page 22 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED LW 2020 Mater Plan - Year 1 Roadway Improvements Lake Worth, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 - 2015 2016 (Design & Permit) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Lake Worth Mr. Felipe Lofaso Assistant Director of Public Services Phone: (561) 586-1720 Email: flofaso@lakeworth.org 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Craven Thompson and Associates was contracted with the City of Lake Worth to design, permit and provide construction services for Projects 1, 3, 5, 6 & 8 of Year 1 of the Lake Worth 2020 Master Plan. Project 1 - North M Street and North K Street from 2nd Avenue North to 6th Avenue North included new watermain and hydrants. North K Street from 2nd Avenue North to 7th Avenue North was in poor condition and required roadway and sidewalk reconstruction. A small segment at the southern end of each road fell within Problem Area 8 of the City’s “Stormwater Master Plan”, and therefore the storm sewer was upgraded. Project 3 - North F Street from 5th Avenue North to 10th Avenue North involved the construction of both storm sewer and watermain. No pavement was identified with a PCI at or below 55 and therefore road reconstruction was necessary; however, utility trenching necessitated pavement replacement in trench areas and asphalt overlay. Project 5 - North M Street from 9th Avenue North to 18th Avenue North involved the reconstruction of roadway. The existing section of road was identified as in a failed condition with a PCI less than or equal to 55. The entire road and base was reconstructed. The majority of the sidewalk also required reconstruction. The existing storm sewer pipe and structures from 16th Avenue North to 18th Avenue North was evaluated as to the condition of the materials. From 9th Avenue North to 16th Avenue North storm sewer was added. Project 6 - on 11th Avenue North from Dixie Highway to North M Street involved the reconstruction of roadway and storm sewer. Between North M Street and North L Street the existing road was rated as being in a failed or poor condition with a PCI of less than or equal to 55. In these areas the entire road and base was reconstructed. The structural condition of the existing storm sewer pipe and structures along the roadway were evaluated. Piping and/or structures identified as in poor structural condition were replaced. Project 8 - North J Street from 13th Avenue North to 16th Avenue North, and 15th Avenue North from North J Street to the railroad tracks, and 14th Avenue North from North J Street to Dixie Highway was identified as a part of Problem Area 3 in the “Stormwater Master Plan”. This project included the installation of 700 linear feet of 24-inch diameter exfiltration trench with a nutrient separating baffle box at the end of the trench, the replacement of 950 linear feet of existing 18 and 24-inch diameter storm sewer with 30-inch diameter RCP storm sewer, and the replacement of 70 linear feet of existing 12-inch diameter storm sewer with 24-inch diameter RCP storm sewer. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime - Surveying, Civil Engineering, Utilities, Storm Water, Storm Sewer, and Construction Inspection Services b. (1) FIRM NAME InfraMap Corp. (2) FIRM LOCATION (City and State) 1860 Old Okeechobee Road West Palm Beach, Florida 33409 (3) Role Subconsultant – Subsurface Utility Locates Existing Proposed E | Page 23 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED North County Neighborhood Improvement Project, Northeast Quadrant, Bid Package 9, Broward County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007 2012 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Broward County Water and Wastewater Services Mr. Pat MacGregor Expansion Project Administrator Phone: (954) 831-0904 Email: pamacgregor@broward.org 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid Package 9 includes approximately 152 acres of land between Dixie Highway and Federal Highway, North of Sample Road in Pompano Beach. The infrastructure improvements to the existing neighborhood included new roadways, sidewalks, swale regrading, drainage, domestic water, sanitary sewer, landscaping, and signage. The area is generally residential with some commercial properties built in the 1950’s and early 1960’s. The area was developed with inadequate sanitary sewer system, no drainage and an under sized domestic water distribution system. As a result of aging and inadequate infrastructure, Broward County selected Craven Thompson and Associates (CTA) to design infrastructure improvements needed in the area. North County Neighborhood Improvement Project, Northeast Quadrant, Bid Package 9 included approximately 152 acres of land between Dixie Highway and Federal Highway, north of Sample Road. Designed improvements included 38,863 linear feet of roadway, 23,000 linear feet of sidewalk, and 14,000 linear feet of swale, 6,560 linear feet of storm sewer, 8,920 linear feet of exfiltration trench and two (2) stormwater control structures, a reuse water distribution system consisting of 22,000 linear feet of 4” diameter, and 1,800 linear feet of 12” diameter main, 57,000 linear feet of domestic water main and 40,000 linear feet of sanitary sewer collection and transmission systems. CTA provided topographic survey, design, permitting landscape architecture, and construction engineering and inspection services. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime - Surveying, Civil Engineering, Landscape Architecture, and Construction Management b. (1) FIRM NAME InfraMap Corp. (2) FIRM LOCATION (City and State) 1860 Old Okeechobee Road West Palm Beach, Florida 33409 (3) Role Subconsultant - Subsurface Utility Locates c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 24 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED North County Neighborhood Improvement Project, Northeast Quadrant, Bid Package 10, Broward County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2013 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Broward County Water and Wastewater Services Mr. Pat MacGregor Expansion Project Administrator Phone: (954) 831-0904 Email: pamacgregor@broward.org 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The infrastructure improvements to the existing neighborhood included new roadway, sidewalk, swale regrading, drainage, landscaping, signage, domestic water, and sanitary sewer. This neighborhood is approximately 60 years old and the infrastructure had reached the end of its useful life. The North County Neighborhood Improvement Project, Northeast Quadrant, Bid Package 10 included approximately 213 acres of land. The project included 47,520 linear feet of roadway reconstruction, and 53,460 linear feet of sidewalk construction. Also included were 15,283 linear feet of swale, 6,508 linear feet of storm sewer, and 8,074 linear feet of exfiltration trench. Several traffic calming devices were designed and constructed as part of this Project. A reuse water distribution system consisting of 32,900 linear feet was constructed on Bid Package 10, as well as approximately 4,740 linear feet of water main, 21 water services, 27,755 linear feet of sanitary sewer collection and transmission lines, and 475 laterals. CTA provided topographic survey, design, permitting landscape architecture, and construction engineering and inspection services. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime - Civil Engineering, ADA, Milling & Re- Surfacing, Storm Water & Engineering Studies b. (1) FIRM NAME InfraMap Corp. (2) FIRM LOCATION (City and State) 1860 Old Okeechobee Road West Palm Beach, Florida 33409 (3) Role Subconsultant - Subsurface Utility Locates c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 25 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED Sistrunk Boulevard (NE / NW 6th Street) Streetscape Enhancement Project, Fort Lauderdale, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 2012 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Fort Lauderdale and Community Redevelopment Agency Mr. Mark Friedman, AIA, NCARB, Project Manager II Phone: (954) 828-5952 Email: MFriedman@fortlauderdale.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Craven Thompson and Associates represented the City of Fort Lauderdale as the Resid ent Project Representative for the Sistrunk Boulevard Streetscape and Enhancement Project providing Construction Engineering and Inspection Services. While the design of this project was managed by the City’s Community Redevelopment Agency (CRA) the construction portion was administered by the City of Fort Lauderdale’s Public Works Department. Primary funding for construction was provided by the Fort Lauderdale CRA. The project area encompasses 2.5 miles of Sistrunk Boulevard (NE/NW 6th Street) from Federal Highway to NW 24th Avenue and includes streetscape and infrastructure improvements consisting of landscaped medians, paver sidewalks, decorative street lighting, traffic signal mast arm installations, undergrounding of overhead utilities, drainage improvements, new water mains and the relocation of various sanitary sewer lines. Work included on- site resolution of construction conflicts and design changes, construction inspection services for quality control and project certification, coordination with FPL, AT&T and Comcast for utility conversions from overhead to underground, close coordination with existing businesses during construction, public relations to keep all parties informed of the ongoing improvements, maintenance of traffic coordination to e nsure continuous access to all affected properties, monthly Pay Application reviews, Change Order reviews and various other construction management duties. This project was partially, federally funded through FDOT LAP funding. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime - Resident Project Representative, Construction Engineering Inspection, Surveying, Landscape Architectural Services b. (1) FIRM NAME Masuen Consulting, LLC (2) FIRM LOCATION (City and State) 32801 Highway 441 N. #293 Okeechobee, Florida 34972 (3) Role Subconsultant - Landscape Irrigation Design c. (1) FIRM NAME Hillers Electrical Engineering, Inc. (2) FIRM LOCATION (City and State) 23257 State Road 7, Suite 100 Boca Raton, Florida 33428 (3) Role Subconsultant - Electrical Engineering & Lighting d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 26 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED North County Neighborhood Improvement Project, Northeast Quadrant, Bid Package 11, Broward County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2014 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Broward County Water and Wastewater Services Mr. Pat MacGregor, Expansion Project Administrator Phone: (954) 831-0904 Email: pamacgregor@broward.org 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The infrastructure improvements to the existing neighborhood included new roadway, sidewalk drainage, swale regrading, landscaping, water, sanitary sewer, and signage, Bid Package 11 was the final area in the North County Neighborhood Improvement, NE Quadrant. The area is primarily residential that was developed in the 1950’s. The existing infrastructure was longer suitable to meet the current standards for water and sanitary sewer facilities. The Project was completed under budget and on time. The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid Package 11 included approximately 357 acres of land between Dixie Highway and Federal Highway, north of Sample Road in Broward County. The project included over 50,688 linear feet of new roadway construction, sidewalks, driveway aprons, and sodded swales In addition the project included over 14,777 linear feet of new storm sewer, 12,993 linear feet of exfiltration trench, 64,000 linear feet of water main, 553 Water Services (many of these services were moved from the rear of the lot to the front), 49,700 linear feet of reuse water main, 796 reclaime d water services, 43,805 linear feet of gravity sewer main, 750 sewer laterals, lift station, and 1,630 linear feet of force main. CTA provided surveying, civil engineering, landscape architecture and CEI services on the project. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime - Surveying, Civil Engineering, Landscape Architecture, Construction Services b. (1) FIRM NAME InfraMap Corp. (2) FIRM LOCATION (City and State) 1860 Old Okeechobee Road West Palm Beach, Florida 33409 (3) Role Subconsultant - Subsurface Utility Locates c. (1) FIRM NAME Masuen Consulting, LLC (2) FIRM LOCATION (City and State) 32801 Highway 441 N., #293 Okeechobee, Florida 34972 (3) Role Subconsultant - Landscape Irrigation Design E | Page 27 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED North County Neighborhood Improvement Project, Northwest Quadrant, Broward County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 2014 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Broward County Water and Wastewater Services Mr. Alan Garcia, P.E. Director of Water & Wastewater Operations Division Phone: (954) 831-0704 Email: agarcia@broward.org 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Services included engineering studies and design (water, roadway, paving, storm water quality treatment, storm sewer, and sanitary sewer), surveying, planning and landscape architecture, and Construction Engineering Inspection Services. The North County Neighborhood Improvement Project, Northwest Quadrant includes land between Dixie Highway and I-95, North of Sample Road, in the City of Deerfield Beach. This area is primarily residential, built in the 1950’s and early 1960’s. The area was developed with limited sanitary sewer system, no drainage and an inadequate and now aged water distribution system. The project which includes approximately 650 acres of land between Dixie Highway and I-95, North of Sample Road, Roadway improvements included 115,596 linear feet of roadway, along with 104,637 linear feet of sidewalk, and storm sewer included 17,006 linear feet of pipe, and there were 33,191 linear feet of exfiltration trench. Additionally, the sanitary sewer collection system consisted of 70,783 linear feet of gravity main, 14,253 linear feet of force main, and four (4) lift stations. The water distribution system additions included 86,112 linear feet of watermain and 1,590 water services CTA provided topographic survey, design, permitting landscape architecture, and construction engineering and inspection services. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime – Civil Engineering, Landscape Architecture, Surveying, Construction Services b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 28 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED Garden Acres Neighborhood Improvements Oakland Park, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2014 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Oakland Park Ms. Jennifer Frastai, ICMA-CM, Director of Engineering & Community Development Phone: (954) 630-4477 Email: Jenniferf@oaklandparkfl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Garden Acres was a single-family residential neighborhood approximately with an area of approximately 24 acres. The new drainage system consists of 4” deep roadway swales, drainage pipes and structures, exfiltration trenches and two controlled discharge points into an existing drainage system located within the NE 6 th Avenue right-of-way. The roadway swales help with the storage and convey the runoff from the roadway and the house lots. The swales and exfiltration trenches handle the water quality volume generated by the roadway right -of- way area. CTA analyzed the system using ICPR software. CTA provided design, permitting and CEI services for the project. The roadway restoration consisted of 4,985 linear feet of roadway. The drainage system consisted of 2,136 linear feet of storm sewer, 4,171 linear feet and of exfiltration trench. The project a lso included major roadway, water and sanitary sewer improvements. The water improvements consisted of 5,591 linear feet of 6” diameter main, and 962 linear feet of 8” diameter main. The sanitary improvements consisted of 7,045 linear feet of 8” diameter sewer, 218 linear feet of 4” diameter forcemain, and 1,044 linear feet of 6” diameter forcemain. Improvements included two lift stations. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime – Civil Engineering Landscape Architecture, Survey Services, & CEI Services b. (1) FIRM NAME InfraMap Corp. (2) FIRM LOCATION (City and State) 1860 Old Okeechobee Road West Palm Beach, Florida 33409 (3) Role Subconsultant – Subsurface Utility Locates c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 29 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED Miami Gardens Livable Neighborhood Improvement Project, Miami Gardens, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 - Present 2010 - Present 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Miami Gardens Mr. Tom Ruiz, Director of Public Works Phone: (786) 279-1260 Email: truiz@miamigardens-fl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Craven Thompson & Associates (CTA) provided all of the surveying services, storm water master planning, all civil engineering, all landscape architectural, and construction management for the project. The Livable Neighborhoods Improvement Project is subdivided among four separate sites; namely Garden Circle, Kings Garden I & II, Kings Garden III and Vista Verde. The various project sites are all located within the confines of NW 183rd Street (Miami Gardens Drive), NW 215th Street (County Line Road), NW 47th Avenue, and NW 37th Avenue in the City of Miami Gardens, Florida. No storm water quality treatment or quantity attenuation facilities were included in the initial developments, which are apparent through the numerous drainage issues observed. The Livable Neighborhoods Improvement Project includes approximately 222 total acres of land . The project includes: 34,200 linear feet of roadway, 7,840 linear feet of sidewalk, 19,000 linear feet of storm sewer, 151 drainage structures, the regrading of 22,500 linear feet of swales, and the addition of 112 street lights, along with street trees and landscape/hardscape. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime - Civil Engineering, Surveying, Landscape Architecture, & CEI Services b. (1) FIRM NAME InfraMap Corp. (2) FIRM LOCATION (City and State) 1860 Old Okeechobee Road West Palm Beach, Florida 33409 (3) Role Subconsultant – Subsurface Utility Locates c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 30 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED Ramblewood Drainage Improvements Project Greenacres, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2013 2014 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Greenacres Mr. Carlos I. Cedeño Public Works Director Phone: (561) 642-2074 Email: ccedeno@ greenacresfl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The project was designed and constructed with the goal of improving the drainage system function and interconnecting missing sidewalks in an existing residential neighborhood. The project required 615 linear feet of drainage piping, 351 linear feet of exfiltration trench, 1,000 linear feet of sidewalk, and numerous driveway restorations within the neighborhood road rights of ways. Significant pavement restoration was also required. The challenges in the project included working around existing water and sewer services to remain in service while installing significant trench and drainage pipe as well as working to minimize impacts to residences during construction as much as possible. The design work was completed August 2014 and the construction was completed December 2014. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime – Civil Engineering, Surveying & CEI Services b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 31 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED Utility Analysis Zone Improvement Program (UAZ) 308 Broward County PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2013 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Broward County Water & Wastewater Services Mr. Patrick MacGregor Expansion Project Administrator Phone: (954) 831-0904 Email: pamacgregor@broward.org 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The UAZ 308 project encompasses approximately 125 acres in the City of Dania Beach and is located south of Griffin Road, west of Anglers Avenue, east of SW 30th Avenue, and north of SW 53rd Court. The infrastructure improvements to the existing neighborhood included new water and sanitary sewer systems. This area is primarily residential, built in the 1950’s and early 1960’s. The area was developed without a sanitary sewer collection system, inadequate drainage, and an inadequate water distribution system. As a result of inadequate infrastructure, Broward County selected Craven Thompson and Associates (CTA) to design infrastructure improvements needed in the area. CTA designed, permitted, and provided constructi on engineering and inspection services for the construction of over 28,700 linear feet of water main, 219 Water Services, 20,300 linear feet of Gravity sewer main, 340 sewer laterals, and 1,270 linear feet of force main. Main line pipe sizes ranged from 6” to 10” in diameter. Project also included over 50,000 SY of new roadway construction, sidewalks, driveway aprons, and re-graded swales. This project required coordination with the City of Dania Beach and included a lift station located within Meli Park. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime - Surveying, Civil Engineering, Landscape Architecture and Construction Services b. (1) FIRM NAME InfraMap Corp. (2) FIRM LOCATION (City and State) 1860 Old Okeechobee Road West Palm Beach, Florida 33409 (3) Role Subconsultant – Subsurface Utility Locates c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 32 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 11 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED City of North Miami Beach Water & Sewer GIS Project, North Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 - 2016 Not Applicable 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of North Miami Beach Mr. Karim L. Rossy Utilities Engineering Manager Phone: (305) 948-2980, ext. 7962 Email: harim.rossy@citynmb.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The purpose of the 25,600 Acre Service Area Project is to provide the City with the complete GIS product of their water and sanitary system. This involved the conversion of the City’s existing water and sanitary sewer infrastructure, from an AutoCAD drawing file format, to the industry standard, Environmental Systems Research Institute (ESRI) Geographic Information System (GIS) format. The Project includes the entire North Miami Beach Utility service area. The process includes conversion of existing AutoCAD files, into the same coordinate system as the GIS, so that future updates will be more easily transferred between the two systems, for updates and maintenance. The project involves setting up a GIS Network file structure for the City to insert existing and future documentation into, as well as, adding GIS database information in the future. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime - Surveying, & GIS b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 33 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 12 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED Eastside Master Infrastructure Project – Phases 2 & 3 Davie, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2015 - 2016 2017 - 2018 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Town of Davie Mr. Phillip Holste, Assistant Town Administrator & Interim CRA Director Phone: (954) 797-1041 Email: phillip_holste@davie-fl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Craven Thompson & Associates (CTA) performed surveying, subsurface locates, design and permitting for approximately 340 acres within the CRA, east of Davie Road, north of Orange Drive, south of SW 36 th Court and west of SW 53rd Avenue. The basic infrastructure work consists of several miles of roadway reconstruction with landscaping, sidewalks, swale re-grading, storm sewer, watermain, and sanitary sewer. More specifically it includes 18,940 linear feet of storm sewer, the reconstruction of 5.2 miles of roadway. 14,800 linear feet of 6" diameter main, 5,075 linear feet of 8" diameter main, and 5,140 linear feet of 12" diameter main, 455 linear feet of 8" diameter sanitary sewer, 40 sanitary manholes and 2,945 linear feet of 16" diameter forcemain. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime - Surveying, Roadway Design, Landscape, Permitting, Bidding & Construction Services b. (1) FIRM NAME InfraMap Corp. (2) FIRM LOCATION (City and State) 1860 Old Okeechobee Road West Palm Beach, Florida 33409 (3) Role Subconsultant – Subsurface Utility Locates c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 34 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 13 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED Original Section Drainage Improvements Project Greenacres, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 - 2015 2016 Phase I Complete 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Greenacres Mr. Carlos I. Cedeño Public Works Director Phone: (561) 642-2074 Email: ccedeno@ greenacresfl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Phase 1 of the project required 4,500 linear feet of drainage pipe, 21,615 linear feet of ditch re-shaping, long lengths of sidewalk replacement, driveway restorations, and pavement restoration. The Phase 1 project required installation of 500 linear feet of 36” RCP storm pipe, 1,010 linear feet of 24” RCP Storm Pipe, 156 linear feet of 18” RCP Storm Pipe, 156 linear feet of 12”x18” RCP storm Pipe, significant ditch reshaping, sidewalk replacement, and replacement of outfall to LWDD canal. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime - Surveying, Civil Engineering, Utilities, Storm Water, Storm Sewer, and Construction Inspection Services b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 35 STANDARD FORM 330 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 14 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED City of North Miami Beach General Consulting Services North Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 - Present Not Applicable 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of North Miami Beach Mr. Karim L. Rossy Utilities Engineering Manager Phone: (305) 948-2980, ext. 7962 Email: harim.rossy@citynmb.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Craven Thompson & Associates, Inc. has served as a General Civil Engineering Consultant for the City of North Miami Beach since 2014. In this role, we have completed numerous Capital Improvement projects including utility GIS; utility rehabilitations; surveying, bidding assistance; permitting and construction engineering and inspection services. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Craven Thompson & Associates, Inc. (2) FIRM LOCATION (City and State) 3563 NW 53rd Street Fort Lauderdale, Florida 33309 (3) Role Prime - Surveying, Civil Engineering, Utilities, Storm Water, Storm Sewer, and Construction Inspection Services b. (1) FIRM NAME InfraMap Corp. (2) FIRM LOCATION (City and State) 1860 Old Okeechobee Road West Palm Beach, Florida 33409 (3) Role Subconsultant – Subsurface Utility Locates c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 36 STANDARD FORM 330 . KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Patrick J. Gibney, P.E. Principal-In-Charge X X X X X X X X X X X X X Timothy J. Hall, P.E. Project Manager X X X Matt Cigale, P.E. Civil Engineer X X X X X X X Douglas Taylor, P.E. Civil Engineer X X X X X Don Shaver Const. Management X X X X X X X X X X X X Richard Pryce, P.S.M. Lead Surveyor X X X X X X X X X X X X X X Joseph D. Handley, R.L.A. Lead Landscape Architect X X X X X X X NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 LW 2020 Mater Plan - Year 1 Roadway, Bicycle Lanes & Watermain Improvements, Lake Worth, Florida 8 Miami Gardens Livable Neighborhood Improvement Project, Miami Gardens, Florida 2 North County Neighborhood Improvement Project, Northeast Quadrant, Bid Package 9, Broward County, Florida 9 Ramblewood Drainage Improvements Project, Greenacres, Florida 3 North County Neighborhood Improvement Project, Northeast Quadrant, Bid Package 10, Broward County, Florida 10 Utility Analysis Zone Improvement Program (UAZ) 308 Broward County 4 Sistrunk Boulevard (NE / NW 6th Street) Streetscape Enhancement Project, Fort Lauderdale, Florida 11 City of North Miami Beach Water & Sewer GIS Project, North Miami Beach, Florida 5 North County Neighborhood Improvement Project, Northeast Quadrant, Bid Package 11, Broward County, Florida 12 Eastside Master Infrastructure – Phases 2 & 3, Davie, Florida 6 North County Neighborhood Improvement Project, Northwest Quadrant, Broward County, Florida 13 Original Section Drainage Improvements, Greenacres, Florida 7 Garden Acres Neighborhood Improvement Project, Oakland Park, Florida 14 City of North Miami Beach General Consulting Services, North Miami Beach, Florida E | Page 37 STANDARD FORM 330 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. Craven Thompson & Associates, Inc. (CTA) has been an industry leader in the South Florida area since our inception in 1962. With our office located in Broward County, we have established a high-profile presence through the years with a reputation of excellent service to many varied clients, performing the full range of professional services. We have worked closely with many governmental agencies to provide services such as roadway design, landscape architecture, neighborhood improvements, water and wastewater design, GIS/Mapping, surveying, planning, storm water management, streetscape, complete streets, roadway beautification and construction management. CTA has been providing professional services to the Tri-County area since the formation of the firm. CTA has been involved in the design, permitting, surveying, contract administration and construction management of numerous infrastructure rehabilitation projects, redevelopment projects and Capital Improvement Projects, including roadway design, streetscape, traffic calming, roadway beautification, complete streets, the replacement and upgrade of water and sewer lines, new infrastructure, sewage pump stations, storm water drainage projects, and waterway projects. Our experience includes the design and construction of parks, roadways and all levels of stormwater management and drainage and municipal facilities. All of these projects included surveying, studies, modeling, cost estimating, design drawings, technical specifications and construction management for the replacement/rehabilitation of existing roadways and infrastructure and the construction of new drainage facilities, pavement and landscaping. CTA presents many distinct and unique advantages which will assure timely and cost -effective completion of projects. These advantages include the following: • An experienced team: CTA staff has extensive experience with various types of unusual and difficult projects. • Full service firm: CTA can provide all of the civil engineering, surveying landscape architecture, planning, GIS and construction management/administrative services needed in-house. • Project management: Organization lines and responsibilities are clearly defined for each project, ensuring that the best qualified individual is matched to a particular assignment. • Familiarity with County & Municipal agencies and engineering practices. • Continuity: The Resources and staff available at CTA ensure responsive service and continuity throughout all phases of projects. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts 31. SIGNATURE 32. DATE September 4, 2018 33. NAME AND TITLE Patrick J. Gibney, P.E., Vice President, Engineering E | Page 38 STANDARD FORM 330 ARCHITECT ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) 18-08-01 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Craven Thompson & Associates, Inc. 3. YEAR ESTABLISHED 1962 4. DUNS NUMBER 06-362-4910 2b. STREET 3563 NW 53rd Street 5. OWNERSHIP a. TYPE Corporation 2c. CITY Fort Lauderdale 2d. STATE Florida 2e. ZIP CODE 33309 b. SMALL BUSINESS STATUS N/A 6a. POINT OF CONTACT NAME AND TITLE Patrick J. Gibney, P.E., Vice President, Engineering 7. NAME OF FIRM (If block 2a is a branch office) Same 6b. TELEPHONE NUMBER (954) 739-6400 6c. E-MAIL ADDRESS pgibney@craventhompson.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER Davis & Craven, Inc. / Davis, Craven, Thompson, Inc. 1962 / 1975 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 02 Administrative 9 1 A06 Airports; Term. & Hangars 6 L01 Lab.; Med. Research Facilities 3 08 AutoCAD Technicians 2 A08 Animal Facilities 1 L02 Land Surveying 1 12 Civil Engineers 25 4 A11 Auditoriums & Theaters 1 L04 Libraries; Museums; Galleries 2 15 Construction Inspectors 6 B01 Barracks; Dormitories 1 O01 Office Bldgs.; Industrial Parks 5 16 Const. Management 2 B02 Bridges 1 P05 Planning (Comm.,Regional) 1 38 Land Surveying 30 C06 Churches; Chapels 1 P06 Planning (Site, Installation) 2 39 Landscape Architect 5 C10 Commercial Bldg.; Shopping 6 P13 Public Safety Facilities 3 47 Planners; Urban/Regional 1 C11 Community Facilities 4 R03 Railroad; Rapid Transit 3 D07 Dining Halls; Clubs; Rest. 1 R04 Rec. Fac. (Parks, Marinas) 6 E02 Educational Facilities 6 R06 Rehabilitation (Buildings) 2 E09 Environmental Impact Studies 1 R09 Resources Recov.; Recycling 1 E11 Environmental Planning 1 R11 Rivers; Canals; Waterways 2 F02 Field Houses; Gyms; Stadiums 1 S04 Sewage Collection, Treatment 5 G01 Garages; Vehicle Maint. Fac. 4 S07 Solid Wastes; Incin.; Landfill 5 H01 Harbors; Ship Terminal Fac. 7 S10 Surveying; Platting; Mapping 1 H06 High-rise 1 S13 Storm Water Handling & Fac. 6 H07 Hwys.; Streets; Parking Lots 7 T02 Testing and Inspection Serv. 1 H09 Hospital & Medical Facilities 5 T03 Traffic & Trans. Engineer 4 H10 Hotels; Motels 4 T04 Topo. Survey & Mapping 1 H11 Housing (Res.,Apts.,Condo) 7 U02 Urban Renewals; Comm. Dev. 9 I01 Industrial Buildings 5 W01 Warehouses & Depots 1 Other Employees I06 Irrigation; Drainage 3 W02 Water Resources; Hydrology 4 Total 80 5 J01 Judicial & Courtroom Fac. 3 W03 Water Supply; Treatment 4 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 1 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work 8 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c. Total Work 8 5. $1 million to less than $2 million 10. $50 million or greater 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE September 4, 2018 c. NAME AND TITLE Patrick J. Gibney, P.E., Vice President, Engineering E | Page 39 STANDARD FORM 330 (6/2004) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME James Kappes, P.E. 13. ROLE IN THIS CONTRACT Project Engineer 14. YEARS EXPERIENCE a. TOTAL 13 b. WITH CURRENT FIRM 13 15. FIRM NAME AND LOCATION (City and State) Hillers Electrical Engineering, Boca Raton, FL. 16. EDUCATION (DEGREE AND SPECIALIZATION) BSEE/2005/Electrical Engineering 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) FL/#71499 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) James Kappes, P.E. brings to this project over 13 years of electrical design and project management experience on major air carrier aviation airport runways, taxiways and apron edge lighting systems, in strumentation landing systems, airfield electrical vaults, water and wastewater facilities, water management pumping stations, lift stations, state -of-the- art distributed control systems, DOT expressways, interchanges, value engineering, energy audits, cos t estimates, testing, startups, lighting systems, security systems, fire alarm system, low and medium voltage distribution systems, normal and stand-by generation, short circuit calculations, fault current calculations, protective device coordination , arc flash analysis, and power, control, instrumentation for facilities in the U.S. and internationally. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Opa-Locka Executive Airport Site Improvement Project (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Preformed electrical design services for the Site Improvement Project at Opa-Locka Executive Airport. Project included demolition of existing site and roadway lighting systems, relocation of existing FP&L overhead distribution systems, relocation of existing AT&T and Comcast communication systems, new FP&L, AT&T and Comcast underground ductbank systems, new lift station, and new road lighting systems. Electrical construction cost: $2.6M. b. (1) TITLE AND LOCATION (City and State) PBIA Golfview Infrastructure Phase 1, Palm Beach International Airport, West Palm Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (If applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Designed electrical communication infrastructure for new PBIA Golfview Development, FP&L / AT&T / Comcast / FiberNet coordination, roadway lighting systems, ductbank and manhole systems, relocation of apron lighting systems, lift station power and control per PBC standards, FAA coordination, and FDOT design and coordination. Projected electrical construction cost: $2.16M. c. (1) TITLE AND LOCATION (City and State) City of Miami Beach – Venetian Islands Bid Package C (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Performed electrical design and construction services for 2.5 miles of new roadway lighting for Rivo Alto, Di Lido and San Marino Islands. Included roadway photometrics, roadway lighting systems, new conduit and conductor systems and electrical service points. Electrical construction cost: $1.1M. d. (1) TITLE AND LOCATION (City and State) City of Aventura – Biscayne Blvd (US1) Roadway Lighting (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Performed electrical design and construction services for replacement of the 2.5 miles of Biscayne Blvd (US1) Roadway Lighting System in the City of Aventura. The existing lighting system was comprised of cobra head fixtures on aluminum light poles that did not fit with the City’s Architectural Scheme. Included roadway photometrics, roadway lighting systems, new conduit and conductor systems and electrical service points. Electrical construction cost: $3M. e. (1) TITLE AND LOCATION (City and State) City of Miami Beach – Neighborhood No.1/Biscayne Point (2) YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (If applicable) 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Performed electrical design and construction services for 6 miles of new roadway lighting for Biscayne Point. Included roadway photometrics, roadway lighting systems, new conduit and conductor systems and electrical service points. Electrical construction cost: $2.5M. E | Page 40 STANDARD FORM 330 (6/2004) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each person) 12. NAME Amy L. Champagne-Baker, P.E. 13. ROLE IN THIS CONTRACT Senior Project Engineer 14. YEARS EXPEREINCE a. TOTAL 21 b. WITH CURRENT FIRM 21 15. FIRM NAME AND LOCATION (City and State) Hillers Electrical Engineering, Inc, Boca Raton, Florida 16. EDUCATION (Degree and Specialization) BSEE/1997/Electrical Engineering 17. CURRENT PROFIESSIONAL REGISTRATION (State and Discipline) Florida Professional Engineer-73735 CT Professional Engineer- #27854 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Proficiency with SKM Power Tools for Windows DAPPER, CAPTOR, Arc Flash and TMS; AutoCAD, LitePRO and various generator sizing programs. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Broward County Water and Waste Services – NRWWTP Facility Improvements Project 9195 Phase III (3) Solids (2) YEAR COMPLETED: PROFESSIONAL SERVICES 2016 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Engineer – Design electrical and control distribution systems for four (4) new motor control centers, modifications to six (6) motor control centers, two (2) new centrifuges, new belt filter presses, new grinder pumps, new subnate recirculation pumps, new skimmers, various new VFDs located in the Thickener Building, Southern Digester, Northern Digester and Dewatering Building. Included on-site verifications, reviewing of record documentation, design of new lighting systems, coordination between various design and construction projects. b. (1) TITLE AND LOCATION (City and State) Broward County Water and Waste Services – NRWWTP Facility Improvements Project 9195 Phase III (3) Biologicals (2) YEAR COMPLETED: PROFESSIONAL SERVICES 2016 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Engineer – Design electrical and control distribution systems for four (4) new motor control centers for four (4) RAS pump stations, replacement of VFDs for RAS pumps, RAS meter vaults, replacement of WAS pump systems, replacement of Scum Pump station, replacement of existing electrical equipment and panelboards as well as replacement of all existing conduit and conductors systems with replacement of lighting systems. Included on-site verifications, reviewing of record documentation, design of new lighting systems, coordination between various design an d contruction projects. c. (1) TITLE AND LOCATION (City and State) Palm Beach County Department of Airports – Generator System Replacement, West Palm Beach, FL (2) YEAR COMPLETED: PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Engineer – Designed for replacement of three (3) existing 1 Megawatt 4160V Generators with two (2) new 2 Megawatt Generators and replacement of associated 4160V Generator Paralleling Switchgear. Included on-site verifications, testing and calculations, designed all power, control and lighting systems, fire alarm system, 4160V emergency power, temporary generator systems, and integration with existing Facility Management and Buildin g Automation Systems. d. (1) TITLE AND LOCATION (City and State) Palm Beach County John Prince Memorial Park High Voltage Distribution Replacement (2) YEAR COMPLETED: PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Engineer – Designed replacement of existing overhead high voltage distribution system to a new underground distribution system for the existing park. Designed new underground 26KV electrical distribution system with 21-new dual voltage 26kV/13.2 KV transformers for a future planned transition to a 13.2KV distribution system, reconnected all existing campgrond services, restrooms and facilities. e. (1) TITLE AND LOCATION (City and State) City of West Palm Beach – 50 Lift Station Short Circuit, Device Coordination & Arc Flash Analysis (2) YEAR COMPLETED: PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Engineer – Performed a Short Circuit, Device Coordination & Arc Flash Analysis on 50 Lift stations electrical power distribution systems for compliance with National Electrical Safety Code 2015 (NFPA 70E), National Electrical Code 2008 (NFPA 70) and IEE 1584. Included field visit for documention of the existing electrical systems, created model in SKM Power Systems to calculate the available short circuit fault currents; identified equipment below that of the associated available fault current; and performed arc flash evaluation to identify the proper personnel protective clothing for working on live equipment. Implemented recommendations for protective device settings and installed Arc flash labels on electrical equipment at all locations. X X X X X Check if project performed with current firm Check if project performed with current firm Check if project performed with current firm Check if project performed with current firm Check if project performed with current firm E | Page 41 STANDARD FORM 330 (6/2004) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED City of Sunny Isles Beach Central Island Drainage & Street Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2009 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Sunny Isles Mr. Rick Conner, P.E. City Manager (305) 792-1928 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Hillers Electrical Engineering (HEE) provided design and construction services for replacement of the 3.4 miles of roadway. Design included coordination with FP&L, roadway photometrics, new electrical service points, new roadway lighting systems, and new conduit and conductor systems. Project Highlights: ▪ Design of 78 new light poles and fixtures. ▪ Three new electrical service points were coordinated with FP&L. ▪ Locations of light poles were coordinated with the City to avoid undesirable locations. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Hillers Electrical Engineering, Inc. (2) FIRM LOCATION (City and State) 23257 State Road 7, Suite 100 Boca Raton, Florida 33428 (3) Role Subconsultant – Electrical Engineering b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 42 STANDARD FORM 330 (6/2004) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED City of Miami Beach Neighborhood No. 1 / Biscayne Point PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2011 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Miami Beach Mr. Jose Perez (305) 673-7071 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Hillers Electrical Engineering (HEE) provided design and construction services for replacement of the 6 miles of Stillwater, Biscayne Point Island and Biscayne Point Neighborhood in the City of Miami Beach. Design included coordination with FP&L, roadway photometrics, new electrical service points, new roadway lighting systems, and new conduit and conductor systems. Project Highlights: ▪ Removal and replacement of 140 existing light fixtures on existing poles. ▪ Design of 200 new light poles and fixtures. ▪ Seven new electrical service points were coordinated with FP&L. ▪ Locations of light poles were coordinated with the City to avoid undesirable locations. Total Electrical Cost: $2,500,000.00 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Hillers Electrical Engineering, Inc. (2) FIRM LOCATION (City and State) 23257 State Road 7, Suite 100 Boca Raton, Florida 33428 (3) Role Subconsultant – Electrical Engineering b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 43 STANDARD FORM 330 (6/2004) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED City of Aventura Biscayne Boulevard (US1) Roadway Lighting PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 2016 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Aventura Mr. Tony Tomei Capital Projects Manager Phone: (305) 466-8923 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Hillers Electrical Engineering (HEE) provided design and construction services for replacement of the 2.5 miles of Biscayne Blvd (US1) Roadway Lighting System in the City of Aventura. The existing lighting system was comprised of cobra head fixtures on aluminum light poles that did not fit with the City’s Architectural Scheme. Total Electrical Cost: $3,000,000.00. Project Highlights: ▪ Lighting protect was divided into four separate phases and four plan volumes that were bid out separately. ▪ New lighting system was installed prior to the demolition of the existing lighting system. Operation of lighting circuits was maintained at all times during construction. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Hillers Electrical Engineering, Inc. (2) FIRM LOCATION (City and State) 23257 State Road 7, Suite 100 Boca Raton, Florida 33428 (3) Role Subconsultant – Electrical Engineering b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 44 STANDARD FORM 330 (6/2004) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED Opa-Locka Executive Airport Site Improvement Project Opa-Locka Executive Airport PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2016 Ongoing 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Opa Locka Airport AA Acquisitions, LLC Mr. Jeff Colasanti Phone: (954) 778-1898 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Hillers Electrical Engineering (HEE) provided design services for the Site Improvement Project at Opa -Locka Executive Airport. Project included demolition of existing site and roadway lighting systems, relocation of existing FP&L overhead distribution systems, relocation of existing AT&T and Comcast communication systems, new FP&L, AT&T and Comcast underground ductbank systems, new lift station, and new road lighting systems. Project Highlights: ▪ Relocate 1 mile of existing FP&L, AT&T and Comcast overhead distribution systems to facilitate the new development. ▪ Design 2 miles of new underground FP&L, AT&T and Comcast ductbank systems to support future Hangar and Terminal developments. ▪ Design 1 mile of new roadway lighting systems per Miami-Dade County and Illuminating Engineering Society (IES) Standards. ▪ Design new duplex lift station with standby generator per MDWASD Standards. Total Estimated Electrical Cost: $2,643,000.00 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Hillers Electrical Engineering, Inc. (2) FIRM LOCATION (City and State) 23257 State Road 7, Suite 100 Boca Raton, Florida 33428 (3) Role Subconsultant – Electrical Engineering b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 45 STANDARD FORM 330 (6/2004) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED Palm Beach International Airport Construct Golfview Infrastructure, Phase I Project PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2013 2018 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Palm Beach County Department of Airports Ms. Cynthia Portnoy Project Manager (561) 471-7411 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Hillers Electrical Engineering (HEE) provided design services for the Construct Golfview Infrastructure, Phase 1 Project at Palm Beach International Airport (PBIA). Project included relocation of existing FP&L underground and overhead distribution systems, new FP&L distribution systems, relocation of existing AT&T, Comcast and FP&L Fibernet communication systems, new lift station, and new road lighting systems. Project Highlights: ▪ Relocate 4200ft of existing FP&L underground ductbank to facilitate the Golfview development. ▪ Relocate 800ft of existing FP&L, AT&T, Comcast and FP&L Fibernet overhead distribution systems to facilitate new turn lane on Military Trail. ▪ Design 1.5 miles of new underground FP&L ductbanks to repower existing PBIA Airfield Lighting and Navigational Systems and support future Hangar and Terminal developments. ▪ Design 2.5 miles of AT&T, Comcast, FP&L Fibernet and Airport Communication ductbank systems to support future Hangar and Terminal developments. ▪ Design 3900ft of new LED roadway lighting systems per Palm Beach County and Illuminatin g Engineering Society (IES). ▪ Design new duplex lift station per Palm Beach County Standards. Total Estimated Electrical Cost: $2,160,000.00 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Hillers Electrical Engineering, Inc. (2) FIRM LOCATION (City and State) 23257 State Road 7, Suite 100 Boca Raton, Florida 33428 (3) Role Subconsultant – Electrical Engineering b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 46 STANDARD FORM 330 (6/2004) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED City of Miami Beach Venetian Islands, Bid Package C PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 Ongoing 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Miami Beach Mr. Jose Perez (305) 673-7071 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Hillers Electrical Engineering (HEE) provided design and construction services for replacement of the 2.5 miles of Rivo Alto, Di Lido and San Marino Islands in the City of Miami Beach. Design included coordination with FP&L, roadway photometrics, new electrical service points, new roadway lighting systems, and new conduit and conductor systems. Project Highlights: ▪ Drawings were divided into three separate volumes, one for each island. ▪ Six new electrical service points were coordinated with FP&L. ▪ Locations of light poles were coordinated with the City to avoid undesirable locations. Total Electrical Cost: $1,100,000.00 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Hillers Electrical Engineering, Inc. (2) FIRM LOCATION (City and State) 23257 State Road 7, Suite 100 Boca Raton, Florida 33428 (3) Role Subconsultant – Electrical Engineering b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role E | Page 47 STANDARD FORM 330 (6/2004) ARCHITECT–ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If Any) RFQ No. 18-08-01 PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Hillers Electrical Engineering, Inc. 3. YEAR ESTABLISHED 1994 4. DUNS NUMBER 876227059 2b. STREET 23257 State Road 7, Suite 100 5. OWNERSHIP a. TYPE Corporation 2c. CITY Boca Raton 2d. STATE Florida 2e. ZIP CODE 33428 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Paul Hillers, President Active 7. NAME OF FIRM (If block 2a is branch office) 6b. TELEPHONE NUMBER 561-451-9165 6c. E-MAIL ADDRESS phillers@hillersee.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER NA NA NA 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 21 Electrical & Instrumentation Design Engineers 9 A05 Airport NAVAIDS, ILS, Lighting, Aircraft Fueling 5 16 Electrical Construction Manager 4 A06 Airport Terminals and Hangars;Freight Handling 5 08 CADD Technician 1 E03 Electrical Studies and Design 4 02 Administrative 1 W03 Water Supply; Treatment and Distribution(Electrical and instrumentation design 5 Other Employees Total 15 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,00 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 1 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work 6 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c. Total Work 7 5. $1 million to less than $2 million 10. $50 million or greater 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 8/29/2018 c. NAME AND TITLE Paul Hillers, President E | Page 48 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL LICENSED IN THE STATE OF FLORIDA The firm of Craven, Thompson & Associates, Inc. is licensed to do business in the State of Florida. Below are copies of such licenses and Key Personnel’s licenses, along with Certifications and Corporate Charters. PROFESSIONAL LICENSES / CERTIFICATIONS / CORPORATE CHARTERS Craven Thompson & Associates, Inc. E | Page 49 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL E | Page 50 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL E | Page 51 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL E | Page 52 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL E | Page 53 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL Hillers Electrical Engineering, Inc. – Electrical Engineering & Lighting E | Page 54 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL KAMM Consulting, Inc. – Mechanical Engineering E | Page 55 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL InfraMap Corp. – Sub-Surface Utility Locates E | Page 56 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL Absolute Civil Engineering Solutions, LLC – Geotechnical Engineering & Testing E | Page 57 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL Masuen Consulting, LLC – Irrigation Design E | Page 58 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION E - QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL E | Page 59 S e c t i o n F F i r m R e f e r e n c e s a n d S i m i l a r W o r k C o m p l e t e d CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED COMPANY OVERVIEW For over fifty-six (56) years Craven Thompson & Associates, Inc. (CTA) has provided consulting services to several governmental agencies throughout South Florida. Through our successful track record in providing infrastructure survey, studies, design, permitting and construction related services, we have maintained relationships with many of those municipalities, that extend way beyond the last five (5) years. As a full-service engineering firm, we specialize in providing services for neighborhood improvement projects. We are intimately familiar with project requirements and working as an extension of City staff. This includes preparing studies, plans, calculations, and specifications, permitting, conducting the necessary public meetings and hearings, bidding projects, coordination with private property owners, inspecting construction, providing contract administration services, and final certification of the project. The emphasis for undergrounding projects is strong project management. Although thorough research and due diligence of existing site-specific conditions is required, equally important is the disseminated and coordinated of the information among the many stakeholders and designers. It is critical that the firm orchestrating this project be able to show proven success in delivering large neighborhood improvement projects while meeting clients’ expectations. The following references come from government agencies we have worked with within the past 5 years. We’re sure you will find favorable recommendations both about the product delivered and level of service provided from each. F | Page 1 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED REFERENCES Reference No. 1 a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address: Mr. Hal G. Barnes, P.E. Assistant to the City Manager. City of Fort Lauderdale Office of Neighbor Support 100 N. Andrews Avenue Fort Lauderdale, Florida 33301 Phone: (954) 828-5065 / Fax: (954) 828-5074 Email: HBarnes@fourtlauderdale.gov b. Project Title: Neighborhood Utility Undergrounding c. Description of Work performed, including the project location: This project does not reflect firm experience, but the experience of CTA’s project manager, Tim Hall. The description is of Tim’s experience with a previous employer. The project involved building a program to facilitate underground for roughly 840 homes within 4 separate private neighborhoods. Without the precedence of other projects, this program needed to be built from scratch. Working closely with City Staff, Tim Hall helped identify the means and methods to implement as well as manage, coordinate, and organize action plans. d. Year Completed: Tim Hall started this project before 2011 and worked on it through 2015, when he left the firm for employment at CTA. F | Page 2 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED Reference No. 2 a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address: Mr. Karim L. Rossy Utilities Engineering Manager City of North Miami Beach 17050 NE 19th Avenue North Miami Beach, Florida 33162 Phone: (305) 948-2980, Ext. 7962 / Fax: (305) 957-3501 Email: karim.rossy@citynmb.com b. Project Title: City of North Miami Beach, General Engineering Services c. Description of Work performed, including the project location: Services include survey, compiling a GIS database of City infrastructure, and design/permitting of specific infrastructure improvements throughout the City. Experience includes collection of as-builts and design data for existing systems and compiling into a cohesive source for information. Demonstrates project management capabilities for multiple projects. d. Year Completed: CTA’s initial involvement with GIS services goes back to 2014. Design services for infrastructure projects are currently ongoing. F | Page 3 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED Reference No. 3 a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address: Mr. Patrick MacGregor Expansion Coordinator Broward County Water and Wastewater Services 2555 West Copans Road Pompano Beach, Florida 33069 Phone: (954) 831-0904 / Fax: (954) 831-0798 Email: pamacgregor@broward.org b. Project Title: North County Neighborhood Improvement Project, Northeast Quadrant, Bid Package 11, Pompano Beach, Florida c. Description of Work performed, including the project location: The infrastructure improvements to the existing neighborhood included new roadway, sidewalk drainage, swale regrading, landscaping, water, sanitary sewer, and signage, Bid Package 11 was the final area in the North County Neighborhood Improvement, NE Quadrant. The area is primarily residential that was developed in the 1950’s. The existing infrastructure was longer suitable to meet the current standards for water and sanitary sewer facilities. The Project was completed under budget and on time. The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid Package 11 included approximately 357 acres of land between Dixie Highway and Federal Highway, north of Sample Road in Broward County. The project included over 50,688 linear feet of new roadway construction, sidewalks, driveway aprons, and sodded swales In addition the project included over 14,777 linear feet of new storm sewer, 12,993 linear feet of exfiltration trench, 64,000 linear feet of water main, 553 Water Services (many of these services were moved from the rear of the lot to the front), 49,700 linear feet of reuse water main, 796 reclaimed water services, 43,805 linear feet of gravity sewer main, 750 sewer laterals, lift station, and 1,630 linear feet of force main. CTA provided surveying, civil engineering, landscape architecture and CEI services on the project. d. Year Completed: 2014 F | Page 4 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED Reference No. 4 a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address: Mr. Tom Ruiz, Director of Public Works City of Miami Gardens 1050 NW 163rd Drive Miami Gardens, Florida 33169 Phone: (786) 279-1260 / Fax: (305) 622-8032 Email: truiz@miamigardens-fl.gov b. Project Title: City of Miami Gardens Livable Neighborhood Project, Miami Gardens, Florida c. Description of Work performed, including the project location: The Livable Neighborhoods Improvement Project is subdivided among four separate sites; namely Garden Circle, Kings Garden I & II, Kings Garden III and Vista Verde. The various project sites are all located within the confines of NW 183rd Street (Miami Gardens Drive), NW 215th Street (County Line Road), NW 47th Avenue, and NW 37th Avenue in the City of Miami Gardens, Florida. No storm water quality treatment or quantity attenuation facilities were included in the initial developments, which are apparent through the numerous drainage issues observed. The Livable Neighborhoods Improvement Project includes approximately 222 total acres of land. The project includes: 34,200 linear feet of roadway, 7,840 linear feet of sidewalk, 19,000 linear feet of storm sewer, 151 drainage structures, the regrading of 22,500 linear feet of swales, and the addition of 112 street lights, along with street trees and landscape/hardscape. d. Year Completed: Ongoing F | Page 5 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED Reference No. 5 a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address: Ms. Jennifer Frastai, ICMA-CM Director of Engineering & Community Development City of Oakland Park 5399 N. Dixie Highway, Suite 3 Oakland Park, Florida 33334 Phone: (954) 630-4477 / Fax: (954) 229-0487 Email: jenniferf@oaklandparkfl.gov b. Project Title: Garden Acres Neighborhood Improvements, Oakland Park, Florida c. Description of Work performed, including the project location: Garden Acres was a single-family residential neighborhood approximately with an area of approximately 24 acres. The new drainage system consists of 4” deep roadway swales, drainage pipes and structures, exfiltration trenches and two controlled discharge points into an existing drainage system located within the NE 6th Avenue right-of-way. The roadway swales help with the storage and convey the runoff from the roadway and the house lots. The swales and exfiltration trenches handle the water quality volume generated by the roadway right-of-way area. CTA analyzed the system using ICPR software. CTA provided design, permitting and CEI services for the project. The roadway restoration consisted of 4,985 linear feet of roadway. The drainage system consisted of 2,136 linear feet of storm sewer, 4,171 linear feet and of exfiltration trench. The project also included major roadway, water and sanitary sewer improvements. The water improvements consisted of 5,591 linear feet of 6” diameter main, and 962 linear feet of 8” diameter main. The sanitary improvements consisted of 7,045 linear feet of 8” diameter sewer, 218 linear feet of 4” d iameter forcemain, and 1,044 linear feet of 6” diameter forcemain. Improvements included two lift stations. d. Year Completed: 2014 F | Page 6 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED Reference No. 6 a. Client Name, Address, Contact, Phone and Fax Numbers and Valid Email Address: Mr. Alan Garcia, P.E. Director of Water & Wastewater Operations Division Broward County Water & Wastewater Services 2555 West Copans Road Pompano Beach, Florida 33069 Phone: (954) 831-0747 / Fax: (954) 831-0798 Email: agarcia@broward.org b. Project Title: North County Neighborhood Improvement, NW Quadrant, Broward County c. Description of Work performed, including the project location: The North County Neighborhood Improvement Project, Northwest Quadrant includes land between Dixie Highway and I-95, North of Sample Road, in the City of Deerfield Beach. This area is primarily residential, built in the 1950’s and early 1960’s. The area was developed with limited sanitary sewer system, no drainage and an inadequate and now aged water distribution system. project which includes approximately 650 acres of land between Dixie Highway and I-95, North of Sample Road, Roadway improvements included 115,596 linear feet of roadway, along with 104,637 linear feet of sidewalk, and storm sewer included 17,006 linear feet of pipe, and there were 33,191 linear feet of exfiltration trench. Additionally, the sanitary sewer collection system consisted of 70,783 linear feet of gravity main, 14,253 linear feet of force main, and four (4) lift stations. The water distribution system additions included 86,112 linear feet of watermain and 1,590 water services CTA provided topographic survey, design, permitting landscape architecture, and construction engineering and inspection services. d. Year Completed: 2014 F | Page 7 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION F - FIRM REFERENCES AND SIMILAR WORK COMPLETED ORGANIZATIONAL CHART PROJECT MANAGER Tim J. Hall, P.E. LEAD LANDSCAPE ARCHITECT Joseph D. Handley R.L.A. CONSTRUCTION MANAGEMENT/ADMINISTRATION Don Shaver LEAD SURVEYOR Richard D. Pryce, P.S.M. IRRIGATION DESIGN Judy Jensen GEOTECHNICAL ENGINEERING & TESTING Wayne Webb, P.E. ELECTRICAL ENGINEERING & LIGHTING James Kappes, P.E. Amy Champagne-Baker, P.E. PRINCIPAL-IN-CHARGE Patrick J. Gibney, P.E. CIVIL ENGINEERING Douglas Taylor, P.E. Matthew Cigale, P.E. MECHANICAL ENGINEERING Art Kamm, P.E., CxA, LEED AP Mircia Pella, P.E., LEED AP SUB-SURFACE UTILITY LOCATES Andres Garcia, ULM F | P a g e 8 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Patrick J. Gibney, P.E. PROJECT ROLE | Principal-In-Charge EDUCATION Bachelor of Science - Civil Engineering Rutgers, The State University 1987 REGISTRATIONS Professional Civil Engineer - Florida No. 49428 (1995) CERTIFICATIONS FDOT Pre-Qualified Roadway Construction Engineering Inspection YEARS OF EXPERIENCE 24 Years w/CTA 6 Years w/Other Firms AREAS OF EXPERTISE Civil Engineering SUMMARY OF EXPERIENCE Mr. Gibney has over thirty years of experience providing project management, design and construction management services for public civil engineering projects. These services include infrastructure improvements for a multitude of infrastructure rehabilitation projects. This includes pavement design, design of water distribution systems, sanitary sewer collection & transmission systems, storm water management systems, drainage systems, preparation of contract documents and specifications and construction inspections. WORK HISTORY Craven Thompson & Associates, Inc., Fort Lauderdale, Florida January 2014 to Present | Vice President, Engineering April 1993 to January 2014 | Senior Supervising Engineer RELEVANT PROJECT EXPERIENCE North County Neighborhood Improvement Project, NE Quadrant, Bid Package 9 | Broward County, Florida | Project Manager. The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid Package 9 included approximately 152 acres of land between Dixie Highway and Federal Highway, north of Sample Road. Designed improvements included 38,863 linear feet of roadway, 23,000 linear feet of sidewalk, and 14,000 linear feet of swale, 6,560 linear feet of storm sewer, 8,920 linear feet of exfiltration trench and two (2) stormwater control structures, a reuse water distributi on system consisting of 22,000 linear feet of 4” diameter, and 1,800 linear feet of 12” diameter main, 57,000 linear feet of domestic water main and 40,000 linear feet of sanitary sewer collection and transmission systems. North County Neighborhood Improvement Projects, NE Quadrant Bid, Package 10 | Broward County, Florida | Project Manager. The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid Package 10 included approximately 213 acres of land. The project included 47,520 linear feet of roadway reconstruction, and 53,460 linear feet of sidewalk construction. Also included were 15,283 linear feet of swale, 6,508 linear feet of storm sewer, and 8,074 linear feet of exfiltration trench. Several traffic calming devices were designed and constructed as part of this Project. A reuse water distribution system consisting of 32,900 linear feet was constructed on Bid Package 10, as well as approximately 4,740 linear feet of water main, 21 water services, 27,755 linear feet of sanitary sewer collection and transmission lines, and 475 laterals. North Central County Neighborhood Improvements Project | Broward County, Florida | Project Manager Managed the design and permitting of the storm water treatment facilities, storm sewer systems, the water distribution systems, the sanitary sewer systems and the roadway modifications for the entire 980 acres. Preparation of Basis of Design Report, Contract Document s, Permitting and Construction Management for 980-acre retrofit infrastructure improvements within unincorporated Broward County. This consisted of approximately 21 miles of roadway, 28,359 linear feet of sanitary lines, 21,308 linear feet of watermain, and 17.5 miles of sidewalk. F | Page 9 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Patrick J. Gibney, P.E. PROJECT ROLE | Principal-In-Charge Central County Neighborhood Improvements Project | Broward County, Florida | Project Manager Preparation of Basis of Design Report, Construction Documents, Permitting and Construction Management for 1,800 acre retrofit infrastructure improvements within unincorporated Broward County. Managed the study of the water distribution system, sanitary sewer system, and roadway networks within the project area. Prepared a Basis of Design Report (BODR), which identified major deficienci es and provided recommendations for improvements. Additional recommendations included construction of improvements to the water distribution system, intended to provide adequate service for firefighting capabilities, improvement of the sanitary sewer system intended to eliminate infiltration of groundwater into the system and thereby reduces system operating costs, and the installation of a sanitary sewer system in the existing un-sewered areas of the neighborhoods. Town of Davie - Eastside Drainage Infrastructure Improvements, Phases I thru III | Davie, Florida | Project Manager. This construction provides drainage infrastructure for the development of a portion of the Downtown Master Plan Area as well the redevelopment of SW 41st Court. The basic infrastructure work consists of replacement of the existing water distribution system and new installation of sanitary sewer system and storm drainage system. The work also includes several miles of roadway reconstruction with landscaping and sidewalks. The water distribution was designed and permitted by CTA, included 14,800 linear feet of 6" diameter main, 5,075 linear feet of 8" diameter main, and 5,140 linear feet of 12" diameter main. The sanitary improvements included 11,455 linear feet of 8" diameter pipe, 40 sanitary manholes and 2,945 linear feet of 16" diameter forcemain. The project also included 18,940 linear feet of storm sewer and the reconstruction of 5.2 miles of roadway. Miami Gardens Livable Neighborhoods Improvement Project | Miami Gardens, Florida | Project Manager. The Livable Neighborhoods Improvement Project includes approximately 222 total acres of land subdivided among four separate sites; namely Garden Circle, Kings Garden I & II, Kings Garden III and Vista Verde. The project includes: 34,200 linear feet of roadway, 7,840 linear feet of sidewalk, 19,000 linear feet of storm sewer, 151 drainage structures, the regrading of 22,500 linear feet of swales, and the addition of 112 street lights, along with street trees and landscape/hardscape. The project began in 2009 and is continuing at present. Four phases are complete. Utility Analysis Zone Improvement Program (UAZ) 308 | Broward County, Florida | Project Manager Mr. Gibney was responsible for the management of the civil engineering design and permitting of a sanitary sewer collection system consisting of 19,253 linear feet - 8” gravity main. The sanitary force main system consisted of 1,215 linear feet - 6” main. The water distribution system additions included 18,281 linear feet - 6” main, and 575 linear feet - 8” main. South County Neighborhood Improvement Project | Broward County | Civil Engineer Assisted with design, permitting and construction management for 1,400 acre retrofit infrastructure improvements within unincorporated Broward County. The design and permitting included the following improvements: water distribution, new sanitary sewer, roadway design, storm water quality treatment, storm water attenuation, new storm sewer, landscaping, signage, and sidewalk systems. The project included the design, permitting, bidding and construction consisting of 53 miles of roadway, 181,000 linear feet of storm sewer (including exfiltration trench), 140,618 linear feet of water main, 236,226 linear feet of gravity sanitary sewer, and 80 miles of sidewalk. F | Page 10 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Timothy Hall, P.E. PROJECT ROLE | Project Manager EDUCATION Bachelor of Science - Civil Engineering University of Maryland (Structural Emphasis) | 1987 REGISTRATIONS Professional Civil Engineer - Florida No. 50588 | 1996 AREAS OF EXPERTISE Civil Engineering YEARS OF EXPERIENCE 11 Years w/CTA - 30 Years Total SUMMARY OF EXPERIENCE With over 30 years of experience, 23 years within South Florida, Mr. Hall has an extensive and diverse project history. His experience includes modeling, master planning, preparation of construction documents, permitting, and construction administration for numerous water distribution, sewer collection, storm water management, and land development projects. Having participated in the design and implementation of everything from small in-fill development to large neighborhood improvements. He has been exposed to a wide range of private land development and public infrastructure projects. Tim’s project management skills and ability to align client needs with jurisdictional requirements is enhanced by his years of experience and variety of projects. WORK HISTORY Craven Thompson & Associates, Inc., Fort Lauderdale, Florida June 2015 to Present | July 1995 to Sept. 2003 | Senior Supervising Engineer Keith and Schnars, Fort Lauderdale, Florida September 2003 - June 2015 | Vice President, Civil Engineering City of Rockville, Rockville, Maryland September 1993 - June 1995 | Civil Engineer RELEVANT EXPERIENCE City of Sunny Isles Beach, Utility Undergrounding, Sunny Isles Beach, Florida Project lead for the City of Sunny Isles Beach undergrounding efforts. Project include d undergrounding of overhead electrical, telephone, and cable within 2.1 miles along Collins Avenue (A1A). Significant coordination required between FP&L, low voltage utilities and FDOT requirements. Understanding of technical requirements and restrictions of both FDOT and utilities required to deal with the physical limitations of constructing within the right-of-way. City of Fort Lauderdale, Undergrounding of Utilities Continuing Services, Fort Lauderdale, Florida In 2009, the City awarded the general services contract to assist in facilitating the undergrounding of utilities within neighborhood through special assessment. Projects required a clear roadmap of procedure, ability to communicate effectively with residents, coordination of utilities, understanding of FP&L tariff and requirements thereof, assistance in drafting proper ordinance, cost estimates, and understanding of special assessment procedures and requirements. City of North Miami Beach, General Consulting Services, North Miami Beach, Florida Craven Thompson & Associates, Inc. has served as a General Civil Engineering Consultant for the City of North Miami Beach since 2014. In this role, we have completed numerous Capital Improvement projects including utility GIS; utility rehabilitations; surveying, bidding assistance; permitting and construction engineering and inspection services. F | Page 11 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Timothy Hall, P.E. PROJECT ROLE | Project Manager City of Fort Lauderdale - General Engineering Services Contract Project Coordinator and point of contact for engineering, landscape, survey, and architectural services provided to the City through open-ended contract. In addition to management of multiple projects, responsible for overseeing design, commitment to schedule and meeting budgets for multi-facetted improvement projects. Projects include programs to provide water and wastewater improvements to existing neighborhoods served by septic systems and without adequate fire protection. Areas served include a mixture of single family, multi-family, commercial, office and industrial uses. In addition to utilities, improvements included streetscape, landscape, drainage, roadway re-alignment and traffic calming. Broward County Neighborhood Improvement Projects, Broward County - Four individual neighborhood improvement projects ranging from 900 to 1600 acres each. Prepare models to identify areas of inadequate fire protection, sewer collection, and drainage. Utilize models to design upgrades to water, force main, lift stations, and drainage. Improvements include re-grading of roadways and landscaping. Traffic Calming at the Intersections of 123rd Street & NW 1st Court, 123rd Street & Miami Court, NW 139th Terrace & NW 5th Court | North Miami, Florida | Project Lead - The project involved the development of designs for traffic calming features along NW 123th Street and NW 1st Court, NW 123rd Street and NW Miami Court, and 139th Street NW 5th Court in the City of North Miami. These intersections had large of expanses of pavement without traffic control and therefore required the impleme ntation of traffic calming features. CTA design elevated intersections, removed pavement and introduced curbing to reduce speeds. Government Center Commercial Alleyways 2” Watermain Replacement | North Miami Beach, Florida | Project Manager - As with many eastern Miami-Dade municipalities, North Miami Beach has an aging and undersized water distribution system. The City has embarked on a program to install & upgrade new watermain at various locations within their services area. The City hired Craven Thompson & Associates, Inc. to survey, design, permit and provide construction engineering and inspection services for the upgraded Government Center system including: 4,830 linear feet of 4” dia. main, 67 water services, and 12 gate valves along with 2,800 SY of pavement restoration. Honey Hill Water System Betterment | North Miami Beach, Florida | Project Manager - As with many eastern Miami-Dade municipalities, North Miami Beach has an aging and undersized water distribution system. The City has embarked on a program to install & Upgrade new watermain at various locations within their services area. The City hired Craven Thompson & Associates, Inc. to survey, design, permit and provide construction engineering and inspection services for the upgraded Government Center system including: 4,830 LF of 4” dia. main, 67 water services, and 12 gate valves along with 2,800 SY of pavement restoration City of Fort Lauderdale - WW2011 Program, Fort Lauderdale, Florida Project Lead for design services related to City’s Capital Improvements Program which included approximately $636 million in utilities infrastructure repair, replacement, and upgrades. The program includes analysis, modeling and design for improvements to water and wastewater facilities in meeting a comprehensive plan in response to expanded demand and service areas. Port Everglades Utilities Analysis, Broward County, Florida Collect data and create model for use in analyzing network of public lift -stations and force mains. Model utilized for analysis of existing capacities as well as adaptability of individual lift stations and force mains for future expansion. Compiled list of alternatives for remediation of inadequate service levels and proposed recommendations for short term and long-term solutions based upon performance, cost, and constructability. F | Page 12 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Matthew Cigale, P.E. PROJECT ROLE | Civil Engineer EDUCATION Bachelor of Science in Civil Engineering Clarkson University | Potsdam, New York | 1996 REGISTRATIONS Professional Engineer – Florida No. 74584 - 2012 YEARS OF EXPERIENCE 18 Years w/CTA - 20 Years Total AREAS OF EXPERTISE Civil Engineering SUMMARY OF EXPERIENCE Mr. Cigale's extensive knowledge includes site plan layout, roadway design, water distribution system design, wastewater collection & transmission system design, storm water management design, planning and calculations, project management, cost estimation, construction permitting, and construction management. WORK HISTORY Craven Thompson & Associates, Inc., Fort Lauderdale, Florida November 1999 to Present | Senior Supervising Engineer Paramount Engineering Group, Inc., Boca Raton, Florida October 1997 to November 1999 | Project Manager RELEVANT PROJECT EXPERIENCE Washington Road Basis of Design Review (BODR) | City of West Palm Beach, Florida | Project Manager Mr. Cigale managed the development of the BODR for the study area, totaling approximately three (3) acres, located within a historical single family residential neighborhood of West Palm Beach. Many of the existing utility systems are inadequate, aging and in need of improvement. The improvements analyzed included: water distribution, wastewater, stormwater/drainage, roadway reconstruction, sidewalk, ADA issues, pavement marking & signage, and landscaping. LW 2020 Year 1 Mater Plan, Lake Worth, Florida - Project Engineer ▪ Project 1 - North K Street and North M Street from 2nd Avenue North to 9th Avenue North. An 8-inch diameter watermain constructed on each street connecting to the existing 12-inch diameter PVC main running east-west along 2nd Avenue North, and to the 8-inch diameter main running east-west along 9th Avenue North. The existing north-south watermains were 2, 4, and 6-inch diameter cast iron and 2-inch diameter galvanized steel lines in the alleys between the streets. Along with the installation of the mains, the water meters at the property lines were relocated to the streets as opposed to the alleys. Hydrants were added in the vicinity of 8th Avenue N, 4th Avenue North, and 3rd Avenue North. Existing hydrants between the streets that were in poor condition were replaced. North K Street from 2nd Avenue North to 7th Avenue N was in poor condition and required roadway and sidewalk reconstruction. A small segment at the southern end of each road fell within Problem Area 8 of the City’s “Stormwater Master Plan”, and therefore the storm sewer was upgraded. ▪ Project 3 - N F Street from 5th Avenue N to 10th Avenue N involved the construction of both storm sewer and watermain. Flood staging did not meet the minimum City criteria for the 5-year, 24-hour event. Therefore, reconstruction of the storm sewer was required and wa ter quantity attenuation with exfiltration trench was implemented. To the north we connected a 12-inch diameter main to the existing 12-inch diameter stub extending south from 10th Avenue N within the road right-of-way and to the south tie into the 8-inch diameter main running east-west along 5th Avenue North. The only existing north-south watermain were 6-inch diameter cast iron mains located in both alleyways immediately east and west of North F Street. The meters were relocated within the road right-of-way F | Page 13 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Matthew Cigale, P.E. PROJECT ROLE | Civil Engineer and two new fire hydrants were constructed with this project. No pavement was identified with a PCI at or below 55 and therefore road reconstruction was necessary; however, utility trenching necessitated pavement replacement in trench areas and asphalt overlay. ▪ Project 5 - North M Street from 9th Avenue North to 18th Avenue North involved the reconstruction of roadway. The existing section of road was identified as in a failed condition with a PCI less than or equal to 55. The entire road and base was reconstructed. The majority of the sidewalk also required reconstruction. The existing storm sewer pipe and structures from 16th Avenue North to 18th Avenue North was evaluated as to the condition of the materials. From 9th Avenue North to 16th Avenue North storm sewer was added. ▪ Project 6 - on 11th Avenue North from Dixie Highway to North M Street involved the reconstruction of roadway and storm sewer. Between North M Street and North L Street the existing road was rated as being in a failed or poor condition with a PCI of less than or equal to 55. In these areas the entire road and base was reconstructed. The structural condition of the existing storm sewer pipe and structures along the roadway were evaluated. Piping and/or structures identified as in poor structural condition were replaced. ▪ Project 8 - North J Street from 13th Avenue North to 16th Avenue North, and 15th Avenue North from North J Street to the railroad tracks, and 14th Avenue North from North J Street to Dixie Highway was identified as a part of Problem Area 3 in the “Stormwater Master Plan”. This project included the installation of 700 linear feet of 24-inch diameter exfiltration trench with a nutrient separating baffle box at the end of the trench, the replacement of 950 linear feet of existing 18 and 24-inch diameter storm sewer with 30-inch diameter RCP storm sewer, and the replacement of 70 linear feet of existing 12-inch diameter storm sewer with 24-inch diameter RCP storm sewer. North County Neighborhood Improvements Project, Northeast Quadrant | Broward County | Project Engineer – Mr. Cigale assisted in the design and permitting of water distribution and sanitary sewer improvements for the infrastructure rehabilitation project. This included a sanitary sewer collection system consisting of 69,550 linear feet - 8” gravity main, 807 linear feet - 10” gravity main, 129 linear feet - 12” gravity main, and 144 linear feet - 16” gravity main. The sanitary force main system consisted of 540 linear feet - 8” main, and 1,540 linear feet 12” main. The water distribution system additions included 35,626 linear feet - 6” main, 10,161 linear feet - 8” main, 841 linear feet - 12” main, 1,306 linear feet - 20” main, and 1,023 linear feet - 24” main, totaling 9.27 miles of water main. North County Neighborhood Improvement Project, Northwest Quadrant | Broward County | Project Engineer - Mr. Cigale was responsible for design and permitting for the water distribution, san itary sewer collection systems, storm sewer systems, and roadway improvements.. The sanitary sewer collection system consisted of 22,047 linear feet - 8” gravity main, and 34 linear feet - 10” gravity main. The sanitary force main system consisted of 295 linear feet - 8” main, 2,235 linear feet - 10” main, 3,790 linear feet - 12” main, 4,300 linear feet - 16” main, and 4,205 linear feet - 20” main. There were ninety three (93) new sanitary manholes added to the area. The water distribution system additions included 5,760 linear feet - 16”water main, 7,156 linear feet - 12” water main, 1,256 linear feet - 10” water main, 12,779 linear feet - 8” water main and 44,217 linear feet - 6” water main. Garden Acres Neighborhood Improvements | Oakland Park, Florida |Project Manager Responsible for preparation of Contract Documents, Permitting and Construction Management for 25- acre residential infrastructure improvement(s) retrofit within the City of Oakland Park. Services include: roadway design; storm water design; water distribution system design; wastewater collection & transmission systems design; permitting; bidding assistance and construction administration. F | Page 14 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Douglas R. Taylor, P.E. PROJECT ROLE | Civil Engineer EDUCATION Bachelor of Science - Civil Engineering University of Illinois | 1984 REGISTRATIONS Professional Civil Engineer - Florida No. 50569 (1996) CERTIFICATIONS FEMA ICS-100 Certification, FEMA ICS-200 Certification TS EM5 Intermediate ICS (G300) Certification, FEMA G400 Intermediate FEMA ICS-700 Certification, FEMA ICS-800 Certification AREAS OF EXPERTISE Civil Engineering YEARS OF EXPERIENCE 7 Years w/CTA – 34 Years Total SUMMARY OF EXPERIENCE Mr. Taylor has been responsible for a multitude of municipal engineering and development projects throughout Florida. This includes project management, master design responsibility and oversight for a variety of projects. Mr. Taylor has 34 years of experience in civil engineering and is a registered Professional Engineer in Florida, Colorado, Illinois, Iowa and Wisconsin. This experience includes 17 years of project management, design and permitting for redevelopment projects in South Florida. WORK HISTORY Craven Thompson & Associates, Inc., Fort Lauderdale, Florida March 2013 to Present | 1996 to 1998 | Director of Municipal Services, Business Development RELEVANT EXPERIENCE Miami Gardens Livable Neighborhoods Improvement Project. The Livable Neighborhoods Improvement Project includes approximately 222 total acres of land subdivided among four separate sites; namely Garden Circle, Kings Garden I & II, Kings Garden III and Vista Verde. The project includes: 34,200 linear feet of roadway, 7,840 linear feet of sidewalk, 19,000 linear feet of storm sewer, 151 drainage structures, the regrading of 22,500 linear feet of swales, and the addition of 112 street lights, along with street trees and landscape/hardscape. The project began in 2009 and is continuing at present. Four phases are complete. LW 2020 Year 1 Mater Plan | City of Lake Worth| Project design & permitting for: ▪ Project 1 - North K Street and North M Street from 2nd Avenue North to 9th Avenue North. An 8-inch diameter watermain constructed on each street connecting to the existing 12-inch diameter PVC main running east-west along 2nd Avenue North, and to the 8-inch diameter main running east-west along 9th Avenue North. The existing north-south watermains were 2, 4, and 6-inch diameter cast iron and 2-inch diameter galvanized steel lines in the alleys between the streets. Along with the installation of the mains, the water meters at the property lines were relocated to the streets as opposed to the alleys. Hydrants were added in the vicinity of 8th Avenue North, 4th Avenue North, and 3rd Avenue North. Existing hydrants between the streets that were in poor condition were replaced. North K Street from 2nd Avenue North to 7th Avenue North was in poor condition and required roadway and sidewalk reconstruction. A small segment at the southern end of each road fell within Problem Area 8 of the City’s “Stormwater Master Plan”, and therefore the storm sewer was upgraded. ▪ Project 3 - North F Street from 5th Avenue North to 10th Avenue North involved the construction of both storm sewer and watermain. Flood staging did not meet the minimum City criteria for the 5 - year, 24-hour event. Therefore, reconstruction of the storm sewer was required and water quantity attenuation with exfiltration trench was implemented. To the north we connected a 12-inch diameter main to the existing 12-inch diameter stub extending south from 10th Avenue North within the road F | Page 15 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Douglas R. Taylor, P.E. PROJECT ROLE | Civil Engineer right-of-way and to the south tie into the 8-inch diameter main running east-west along 5th Avenue North. The only existing north-south watermains were 6-inch diameter cast iron mains located in both alleyways immediately east and west of North F Street. The meters were relocated within the road right-of-way and two new fire hydrants were constructed with this project. No pavement was identified with a PCI at or below 55 and therefore road reconstruction was necessary; however , utility trenching necessitated pavement replacement in trench areas and asphalt overlay. ▪ Project 5 - North M Street from 9th Avenue North to 18th Avenue North involved the reconstruction of roadway. The existing section of road was identified as in a failed condition with a PCI less than or equal to 55. The entire road and base was reconstructed. The majority of the sidewalk also required reconstruction. The existing storm sewer pipe and structures from 16th Avenue North to 18th Avenue North was evaluated as to the condition of the materials. From 9th Avenue North to 16th Avenue North storm sewer was added. ▪ Project 6 - on 11th Avenue North from Dixie Highway to North M Street involved the reconstruction of roadway and storm sewer. Between North M Street and North L Street the existing road was rated as being in a failed or poor condition with a PCI of less than or equal to 55. In these areas the entire road and base was reconstructed. The structural condition of the existing storm sewer pipe and structures along the roadway were evaluated. Piping and/or structures identified as in poor structural condition were replaced. ▪ Project 8 - North J Street from 13th Avenue North to 16th Avenue North, and 15th Avenue North from North J Street to the railroad tracks, and 14th Avenue North from North J Street to Dixie Highway was identified as a part of Problem Area 3 in the “Stormwater Master Plan”. This project included the installation of 700 linear feet of 24-inch diameter exfiltration trench with a nutrient separating baffle box at the end of the trench, the replacement of 950 linear feet of existing 18 and 24 -inch diameter storm sewer with 30-inch diameter RCP storm sewer, and the replacement of 70 linear feet of existing 12-inch diameter storm sewer with 24-inch diameter RCP storm sewer. Town of Davie - Eastside Drainage Infrastructure Improvements, Phases I thru III | Davie, Florida | Civil Engineer. This construction provides drainage infrastructure for the development of a portion of the Downtown Master Plan Area as well the redevelopment of SW 41st Court. The basic infrastructure work consists of replacement of the existing water distribution system and new installation of sanitary sewer system and storm drainage system. The work also includes several miles of roadway reconstruction with landscaping and sidewalks. The water distribution was designed and permitted by CTA, included 14,800 linear feet of 6" diameter main, 5,075 linear feet of 8" diameter main, and 5,140 linear feet of 12" diameter main. The sanitary improvements included 11,455 linear feet of 8" diameter pipe, 40 sanitary manholes and 2,945 linear feet of 16" diameter forcemain. The project also included 18,940 linear feet of storm sewer and the reconstruction of 5.2 miles of roadway. Hallandale Beach NE Quadrant Drainage Study & Improvements, Hallandale Beach, Florida, Project Manager. There are a number of drainage facilities within the 200-acre project area with limited conveyance capacity and high head loss. Average lowest floor elevations average between 5.5’ to 6.5’ NGVD, and roadway elevations are approximately 3.7’ to 3.9’ NGVD within the study area. The conveyance system is subject to the effects of tidal fluctuation; and therefore, at times there is virtually no head available to drain the basin, and in addition no water quality tr eatment was provided. The lack of conveyance capacity within this system has led to 37 Severe Repetitive Loss (RL) properties and the complete inundation of the roadway system for extended periods during storm events of lesser frequency than that required by SFWMD. Using ICPR, he modeled a proposed system of a pump station connected to sixteen (16) wells. These sixteen new wells will be pressurized with fifteen (15) feet of head in order to produce the necessary discharge into the G3 aquifer. A new storm sewer collection system was designed and permitted, along with a water quality treatment system for the 200-acre tributary area. F | Page 16 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Donald Shaver PROJECT ROLE | Construction Manager EDUCATION Bachelor of Science - Construction Science Kansas State University, Manhattan, Kansas | 1981 Associates in Technical Education, Building Science Hutchinson Community College, Hutchinson, Kansas | 1978 REGISTRATIONS State of Florida General Contractor (Inactive) YEARS OF EXPERIENCE 18 Years w/CTA – 37 Years Total SUMMARY OF EXPERIENCE Mr. Shaver is responsible for coordination with Clients and contractors, supervision of inspection personnel, inspection of infrastructure engineering projects including earthwork, water distribution, sanitary sewer systems, storm drainage and roadways. Performs shop drawing reviews, pay application processing, certifications, construction management and review of record drawings for private and municipal clients. WORK HISTORY Craven Thompson & Associates, Inc., Fort Lauderdale, Florida July 2000 to Present | Director of Construction Services / Construction Manager Craig A. Smith & Associates, Pompano Beach, Florida 1989 to 2000 | Vice Pres.-Land Development / Director - Construction Services Frederic R. Harris, Inc., Fort Lauderdale, Florida 1987 to 1989 | Project Manager Broward County Airport Expansion Office., Fort Lauderdale / Hollywood International Airport - 1983 to 1987 | Project Manager RELEVANT EXPERIENCE South County Neighborhood Improvements Project | Broward County, Florida | Construction Manager Mr. Shaver was responsible for the construction management of major sections of the South County Neighborhood Improvement Project. The project consisted of twelve construction packages with a total construction cost of approximately $70 million dollars. Improvements included water distribution, sanitary sewer, lift stations, force main, storm water improvements and roadway construction. The project included the design, permitting, bidding and construction consisting of 53 miles of roadway, 181,000 linear feet of storm sewer (including exfiltration trench), 140,618 linear feet of water main, 236,226 linear feet of gravity sanitary sewer, and 80 miles of sidewalk. Garden Acres Neighborhood Improvements | Oakland Park, Florida | Construction Manager Mr. Shaver was responsible for Construction management for the construction of the Garden Acres Neighborhood Improvements. The project consisted of water distribution system, sanitary sewer system, lift station, storm water system and roadway re-construction. Construction cost is $2.95 million. Davie Road Phase 1 CEI Services | Town of Davie, Florida | Construction Manager This project was for the construction engineering inspection services to re-construct a public roadway known as Davie Road Phase 1 within public Right-of-Way owned by Broward County extending from the State Road 84 Right-of-Way to Nova Drive. The length of the reconstruction was approximately 2,640 F | Page 17 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Donald Shaver PROJECT ROLE | Construction Manager linear feet. The primary intent was for CTA to provide construction engineering inspection services for the re-construction of the roadway. The construction project consisted of pavement, base and sub -grade reconstruction, curb & gutter construction, bike lane construction, sidewalk construction, median construction, driveway reconstruction within the Right -of-Way, drainage system construction, landscaping & irrigation construction, pavement marking & signage, traffic signal modification at Reese Road and at Nova Drive, street lighting, and coordination with utility companies. NE/NW 6th Street (Sistrunk Blvd.) Streetscape and Enhancement Project, Fort Lauderdale, Florida Construction Management services and oversight of Resident Project Representative (RPR) for Sistrunk Blvd. Streetscape and Enhancement Project. The project was funded and managed by the Fort Lauderdale CRA and included streetscape improvements consisting of landscape, median, paver sidewalk, lighting, drainage and other improvements. Work included close coordination with existing businesses during construction, public relations to keep all parties informed of improvements, maintenance of traffic coordination to ensure access to all affected properties throughout construction and a full time RPR on-site managing the project. The project was federally funded including LAP funding Eastside Master Infrastructure Project Phases 2 & 3 | Davie, Florida | Construction Manager Mr. Shaver was responsible for construction management for the replacement of the existing water distribution system and new installation of sanitary sewer system and storm drainage system. The work also includes several miles of roadway reconstruction with landscaping and sidewalks. The water distribution was designed and permitted by CTA, included 14,800 linear feet of 6" diameter main, 5,075 linear feet of 8" diameter main, and 5,140 linear feet of 12" diameter main. The sanitary improvements included 11,455 linear feet of 8" diameter pipe, 40 sanitary manholes and 2,945 linear feet of 16" diameter forcemain. The project also included 18,940 linear feet of storm sewer and the reconstruction of 5.2 miles of roadway Harlem McBride Area Drainage Improvements | Oakland Park, Florida | Construction Manager He was responsible for Construction management for drainage and roadway construction of Harlem McBride area. The project consisted of a water distribution system, a storm water system, and roadway pavement overlay. Construction cost is $500,000. City of Greenacres Municipal Complex | Greenacres, Florida | Construction Manager He was responsible for Construction Management of the infrastructure for City Hall and Public Works. The project consisted of installation of water distribution, sanitary sewer system, lift station, storm water system and roadway and parking lot. F | Page 18 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Richard D. Pryce, P.S.M. PROJECT ROLE | Lead Surveyor EDUCATION Associate of Science - Criminal Justice Broward Community College | 1978 REGISTRATIONS Professional Surveyor and Mapper - Florida No. 4038 (1983) PUBLICATIONS Co-author POB Magazine - "22,000 Acres and Counting" November 1998 Co-author POB Magazine - "The CAD Revolution", Sept. 1999 AREAS OF EXPERTISE Surveying YEARS OF EXPERIENCE 12 Years w/CTA – 46 Years Total AFFILIATIONS Past Director - Broward County Chapter of FL Surveying & Mapping Society State & County Chapters, FL Surveying & Mapping Society American Congress on Surveying and Mapping National Society of Professional Surveyors American Society of Photogrammetry and Remote Sensing SUMMARY OF EXPERIENCE Mr. Pryce has over forty-six years of experience surveying in South Florida. He has specialized in all aspects of the land surveying & mapping profession and has also specialized in developing GIS/Survey applications using ESRI ArcGIS software since 1990. Mr. Pryce has specialized training in BLM PLSS retracement surveys, legal research and resolving boundary disputes. Mr. Pryce has been fully trained on Leica 3D Laser Scanners and 3D Modeling for use in High Density Surveying of Commercial, Historical and Utility Sites. He has also been developing ways to analyze Lidar data for City-wide Storm water and Drainage studies. WORK HISTORY Craven Thompson & Associates, Inc., Fort Lauderdale, Florida April 2006 to Present | Vice President, Surveying & GIS Miller Legg & Associates, Inc., Pembroke Pines, Florida October 1997 to April 2006 | GIS Coordinator/Service Manager/PSM R.D. Pryce & Associates, Inc., Davie, Florida October 1992 to October 1997 | President / Owner RELEVANT EXPERIENCE Miramar Historical Area Complete Streets Project – Phase II | Miramar, Florida | Principal Surveyor Craven Thompson & Associates, Inc. was selected by the City of Miramar to prepare a right -of-way topographic survey, design, permit, and provide construction services for Phase II of their Historical Area Complete Streets Project. The project includes surveying, landscape and engineering design, permitting and construction services for complete streets bounded by Pembroke Road to the north, County Line Road to the south, SW 62nd Avenue to the west, and State Road 7 to the east. The project includes eight (8) streets in the Historical Area. The improvements include: sidewalks, ADA ramps, crosswalks, pedestrian level lighting, landscaping and hardscape. The City received a grant through the Broward Redevelopment Program for the improvements. North County Neighborhood Improvements Project, Northeast Quadrant, Broward County | Broward County | Principal Surveyor – Mr. Pryce managed the surveying services necessary for the design and permitting of the water distribution and sanitary sewer systems for this large rehabilitation project. The project included a sanitary sewer collection system consisting of 69,550 linear feet - 8” gravity main, 807 linear feet - 10” gravity main, 129 linear feet - 12” gravity main, and 144 linear feet - 16” gravity main. The sanitary force main system consisted of 540 linear feet - 8” main, and 1,540 linear feet 12” main. The water distribution system additions included 35,626 linear feet - 6” main, 10,161 linear feet - 8” F | Page 19 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Richard D. Pryce, P.S.M. PROJECT ROLE | Lead Surveyor main, 841 linear feet - 12” main, 1,306 linear feet - 20” main, and 1,023 linear feet - 24” main, for a total of 9.27 miles of water main. North County Neighborhood Improvement Project, Northwest Quadrant | Broward County, Florida | Principal Surveyor - The North County Neighborhood Improvement Project, Northwest Quadrant included approximately 650 acres of land between Dixie Highway and I-95, North of Sample Road, in the City of Deerfield Beach. Mr. Pryce managed the surveying services necessary for the design and permitting for the water distribution, sanitary sewer collection systems, storm sewer systems, and roadway improvements for the entire 650 acres. The sanitary sewer collection system consisted of 22,047 linear feet - 8” gravity main, and 34 linear feet - 10” gravity main. The sanitary force main system consisted of 295 linear feet - 8” main, 2,235 linear feet - 10” main, 3,790 linear feet 12” main, 4,300 linear feet - 16” main, and 4,205 linear feet - 20” main. There were ninety-three (93) new sanitary manholes added to the area. The water distribution system additions included 5,760 linear feet - 16” water main, 7,156 linear feet - 12” water main, 1,256 linear feet - 10” water main, 12,779 linear feet - 8” water main and 44,217 linear feet - 6” water main. Utility Analysis Zone Improvement Program (UAZ) 308 | Broward County, Florida | Principal Surveyor Mr. Pryce was responsible for the management of the surveying services necessary for the design and permitting of a water distribution system and sanitary sewer collection system consisting of 19,253 linear feet - 8” gravity main, a sanitary force main system consisting of 1,215 linear feet - 6” main, and a water distribution system consisting of 18,281 linear feet - 6” main, and 575 linear feet - 8” main. Utility Analysis Zone Improvement Program (UAZ) 124 | Broward County, Florida | Principal Surveyor Responsible for the surveying services necessary for the design and permitting of the UAZ 124 project located between Florida Turnpike, State Road 7, Commercial Boulevard and NW 39th Street. The infrastructure improvements to the existing neighborhood included new water, sanitary sewer systems for 825 residences. This area is primarily residential, built in the 1950’s and early 1960’s. Mr. Gibney assisted in modeling, design, permitting for the construction of the water distribution system additions included 27,210 linear feet - 6” main, 6,040 linear feet - 8” main and 5,380 linear feet - 10” main for a total of 38,630 linear feet of water main. The project also included the abandonment in-place and grouting of 33,000 linear feet of existing water main, and the replacement of 825 water services. Aerial LiDAR Surveying & Mapping | Hallandale Beach, Florida | Principal Surveyor The survey included a GPS control network to meet horizontal and vertical accuracies to 0.10 feet on all hard surfaces within the City Limits. This included setting 188 aerial targets to control an area of about 26,000 acres from Pembroke Road, south to the Broward / Miami-Dade County line and from the Atlantic Ocean west to Interstate 95. Our survey crews then ran level loops and cross -sections over 862 ground truth checks on hard surfaces at 80 street intersections across the City wi th accuracy of 0.05 feet at 67% (one sigma) and 0.10 feet accuracy at 95% (two sigma). The Lidar was flown by our subcontractor, Pickett & Associates, Inc., and checked by Craven Thompson & Associates, Inc. The Survey included 2 - inch pixel resolution aerials, identifying and mapping overall drainage flows across the City for drainage basin designation, including review of outfalls and drainage structures upstream. City of North Miami Beach Consulting (Engineering, Surveying & GIS) Services | North Miami Beach Mr. Pryce has managed all survey and GIS projects activities to date which are part of our general consulting contract for the City of North Miami Beach on capital improvement projects. Survey work for the City’s Water & Wastewater GIS project which includes surveying and mapping parcels and rights-of- way in 40 Sections of land in their Water Service Area covering parts of five surrounding cities. F | Page 20 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Joseph D. Handley, R.L.A. PROJECT ROLE | Lead Landscape Architect EDUCATION B.S. in Ornamental Horticulture Clemson University | 1976 - 1980 Attended Masters in Landscape Architecture Program University of Georgia and Louisiana State University | 1981 - 1984 REGISTRATIONS Professional Registered Landscape Architect - Florida No. 1368 (1990) AREAS OF EXPERTISE Landscape Architecture YEARS OF EXPERIENCE 30 Years w/CTA – 35 Years Total SUMMARY OF EXPERIENCE Mr. Handley has been involved in a broad range of land planning projects in South Florida for the past thirty-five years. Having worked in both the public and private sectors, Mr. Handley is widely familiar with client needs and project requirements and processes. He is responsible for overseeing the preparation and processing of plats, site, landscape, hardscape, streetscape and irrigation plans; utilizing his knowledge of local, state and federal regulations involved in land development. He has direct client contact to obtain project input and approvals, responsible for completion of projects on time and within budget. WORK HISTORY Craven Thompson & Associates, Inc., Fort Lauderdale, Florida September 1993 - Present | Vice President, Planning and Landscape Architecture February 1988 - September 1993 | Senior Land Planner RELEVANT EXPERIENCE North Central County Neighborhood Improvements Project | Broward County, Florida | Principal Landscape Architect Preparation of Basis of Design Report, Contract Documents, Permitting and Construction Management for 980-acre retrofit infrastructure and landscape improvements within unincorporated Broward County. Central County Neighborhood Improvements Project | Broward County, Florida | Principal Landscape Architect - Preparation of Basis of Design Report, Construction Documents, Permitting and Construction Management for 1,800 acre retrofit infrastructure and landscape improvements within unincorporated Broward County. South County Neighborhood Improvements Project | Broward County, Florida | Principal Landscape Architect - Preparation of Basis of Design Report, Construction Documents, Permitting and Construction Management for 1,400 acre retrofit infrastructure and landscape improvements within unincorporated Broward County. Client: Broward County Office of Environmental Services. Sunrise Bicycle/Pedestrian, Greenways and Trails Master Plan | Sunrise | Principal Landscape Architect Craven Thompson & Associates, Inc. along with Alta Planning + Design was hired by the City of Sunrise to prepare a Bicycle / Pedestrian Greenways & Trails Master Plan. The Plan defines a system of sidewalks, bike lanes, paths, greenways and trails within the City of Sunrise that provides integrated and continuous corridors for non-motorized transportation and recreation throughout the city in a manner that is sensitive to the needs of various user groups, the natural and built environment, the management and maintenance, and potential funding capabilities of local government. F | Page 21 CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 Joseph D. Handley, R.L.A. PROJECT ROLE | Lead Landscape Architect NW 44th Street Passive Park and Oakland Park Boulevard Passive Park | Sunrise, Florida | Principal Landscape Architect - Construction Cost: $8 Million. These 2 passive parks developed under the Broward County Parks Bond Program include upland and wetland restoration, a splash pad, a nature - themed playground, restroom and storage buildings, jogging paths, picnic shelters and canal boardwalk. NE 38th Street (Andrews Avenue to NE 11th Avenue) | Oakland Park, Florida | Principal Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction design of approximately 0.90 miles of roadway improvements including neighborhood traffic calming. Features to Enhance Neighborhood Integrity | Oakland Park, Florida | Principal Landscape Architect Redesign of the entry features for the Royal Palm Isles and South Royal Palm Acres. NE 34th Court Reconstruction (NE 2nd Avenue to Dixie Highway) | Oakland Park, Florida | Principal Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction design of approximately 0.60 miles. NE 5th Avenue Reconstruction (Oakland Park Blvd to NE 38th Street) | Oakland Park, Florida | Principal Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction design of approximately 0.60 miles. Miramar Parkway (I-75 to Flamingo Road) | Miramar, Florida | Principal Landscape Architect Landscape, streetscape and irrigation design for the roadway reconstruction design of 2.5 miles. Sheridan Street (NW 172nd Avenue to NW 184th Avenue) | Pembroke Pines, Florida | Principal Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction design of approximately 1 mile. Pembroke Road (SW 145th Avenue to Silver Shores) | Miramar & Pembroke Pines, Florida | Principal Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction design of approximately 1.5 miles. Sunrise Boulevard (Hiatus Road to Pine Island Road) | Sunrise, Florida | Principal Landscape Architect Landscape, streetscape and irrigation design for the roadway reconstruction design of approximately 1.8 miles. Broward Boulevard (Pine Island Road to University Drive) | Plantation, Florida | Principal Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction design of approximately 0.80 miles. City of Dania Beach Public Services Administration Building | Dania Beach, Florida | Principal Landscape Architect - The Public Services building was a complicated project due to the expansive area of parking for the utility vehicles. The perimeter had to be heavily landscaped to compensate for the paving area and to help screen the facility from the neighboring residential properties. The landscape materials utilized were 100% native to provide a positive example to the community on how the City has taken an effort to design with the environment in mind. F | Page 22 Resume James William Kappes, P.E., Electrical Engineer Hillers Electrical Engineering, Inc. Education Bachelor of Science in Electrical Engineering, 2005 Florida Atlantic University Professional Registration Registered Electrical Engineer, Florida No. 71499 Experience 13 years electrical design and construction management Hillers Electrical Engineering, Inc., 2005 to present Airport experience includes runway, taxiway, centerline, runway guard lights, apron and approach lighting systems for major air carrier and general aviation airports, guidance and mandatory signage, MALSR, LAHSO, PAPI, REIL and NAVAID systems, instrumentation landing systems, FAA coordination, airfield lighting control systems, airfield electrical vaults, aircraft maintenance hangars, T hangars, fuel systems, and security systems. Design and construction services experience includes: electrical distribution, control and communication systems for water-waste water facilities and storm water pumping facilities; medium and low voltage systems; control; communication; lighting; security; access control; fire alarms; normal and standby generation systems; lift stations; inspections of existing facilities; county administration and maintenance facilities. Transportation experience includes lighting and power distribution design for Florida Department of Transportation major roadways, interchanges, bridge exterior and interior electrical and lighting systems, signage systems, including illumination and voltage drop calculations, pole locations, power supply and distribution, 100% plans and project review process, coordination with utilities departments, writing specifications and completing estimates and tabulation quantities for state, county, and municipal agencies in the state of Florida. Sports lighting, electrical distribution, site lighting, parking lot lighting, testing of existing electrical systems, communications, public address and scoreboard systems design and construction management for minor and recreational football, baseball, and soccer complexes owned by county, municipal agencies and private developers. Water and waste water experience includes control and communication systems for water-waste water facilities and storm water pumping facilities. Skills include: specification creation; value engineering; energy analysis; testing; cost estimates; start-up; onsite inspections; condition assessment. Proficiency with AutoCAD, LitePRO, GE Lighting Systems Aladan + Plus. F | Page 23 Resume Amy L. Champagne-Baker, P.E., Senior Electrical Engineer Hillers Electrical Engineering, Inc. Education Bachelor of Science in Electrical Engineering, 1997 Clarkson University Professional Registration Registered Electrical Engineer, Florida No. 73735 Experience 21 years electrical design and construction management Hillers Electrical Engineering, Inc., 1997 to present Airport experience includes runway, taxiway, centerline, runway guard lights, wig-wags, apron and approach lighting systems for major air carrier and general aviation airports, guidance and mandatory signage, MALSR, LAHSO, PAPI, REIL, ODALs, glideslope, instrument landing systems, FAA relocation of RT and RR facilities, FAA coordination, airfield lighting control systems, airfield electrical vaults, aircraft maintenance hangars, T hangars, fuel systems, security systems, parking garages, and park and ride lighting. Transportation experience includes lighting and power distribution design for Florida Department of Transportation major roadways, interchanges, bridge exterior and interior electrical and lighting systems, signage systems, including illumination and voltage drop calculations, pole locations, power supply and distribution, 100% plans and project review process, coordination with utilities departments, writing specifications and completing estimates and tabulation quantities for state, county, and municipal agencies in the state of Florida. Sports lighting, electrical distribution, site lighting, parking lot lighting, testing of existing electrical systems, communications, public address and scoreboard systems design and construction management for professional, minor and recreational football, baseball, soccer, tennis, hockey, basketball and roller hockey complexes owned by county, municipal agencies and private developers. Design and construction services experience includes electrical distribution, medium and low voltage systems, communication, lighting, security, access control, baggage handling, fire alarms systems, CCTV, normal and standby generation systems, lift stations, and on-site construction services for main airport terminal buildings, airfields, county administration & maintenance facilities. Skills include: specification creation; constructability review, value engineering; energy analysis; testing; cost estimates; start-up; onsite inspections; and condition assessments. Proficiency with AutoCAD, MicroStation, SKM Power Tools for Windows DAPPER, CAPTOR, LitePRO, GE Lighting Systems Aladan + Plus. Professional Membership Institute of Electrical and Electronic Engineers (IEEE) LEED Accredited Professional F | Page 24 Education 9/1977 – 12/1983 – BSME University of Toledo, Ohio Licenses ▪ State of Florida – Professional Engineer ▪ State of Florida Building Contractor License ▪ State of Florida Mechanical Contractor License Professional Memberships ▪ American Society of Heating, Refrigerating and Air Conditioning Engineers ▪ Institute of Electronics and Electrical Engineers, Inc. Professional Accreditation ▪ United States Green Building Council - LEED® Accredited Professional ▪ ACG Commissioning Group – Washington, DC – Certified Commissioning Authority (CxA) Professional Experience Mr. Kamm is the founder and C.E.O. of Kamm Consulting, Inc. He has 30+ years of experience in mechanical and electrical engineering and the construction industry. His in- depth knowledge and experience are unique to the engineering profession. He has a diversified background in the engineering and design of complex, highly available facilities. His direct, hands-on work experience in the construction industry gives him a practical perspective of considerable value to clients requiring optimum performance of their facilities investments. Mr. Kamm has extensive experience in providing facilities analyses of HVAC, electrical, plumbing, and fire protection problems. These analyses include inspection, testing, commissioning, and trouble-shooting all types of mechanical / electrical systems. He has expertise in providing building evaluations and studies for owners/developers during the due diligence period for real estate transactions involving large commercial buildings, and has also served as an expert witness for litigation involving engineering and construction issues. Mr. Kamm has been directly involved in over 70 LEED Registered projects including LEED for New Construction, LEED LEED for Schools, LEED for Commercial Interiors and LEED for Core & Shell buildings. He has been retained as Commissioning Agent for Fundamental and Enhanced Commissioning as well as Commissioning Agent for commercial buildings. As the LEED Accredited Professional, he has led initial design charrettes with LEED project design teams representing all disciplines as well as providing oversight for all USGBC required documentation for LEED Certification. F | Page 25 Education 1975 – 1980 - MSME, Bucharest Polytechnic Institute, Romania. MBA - Florida Atlantic University Licenses Florida Professional Engineer Professional Accreditation USGBC LEED AP Employment History 8/24/98 – Present: Director of Mechanical Engineering – Kamm Consulting, Inc., Deerfield Beach, Florida. Professional Memberships American Society of Heating, Ventilation and Air Conditioning Engineers (ASHRAE) Professional Experience Mr. Pella has 20+ years of mechanical engineering and project management experience, with broad, in-depth involvement in HVAC and fire sprinkler systems design. He is an experienced, capable leader of multi-discipline engineering teams. As a senior design professional with Kamm Consulting, Mr. Pella is responsible for planning, designing and implementing a broad range of projects. Mr. Pella has completed multiple new-construction and renovation projects for multi-family, mixed use, office buildings, hotels, restaurants, medical facilities, computer rooms, telecommunications facilities, call centers, retail and commercial centers, schools, condominiums and custom residences. Mr. Pella consistently delivers practicable solutions on time and on budget. His experience is particularly valuable to clients requiring continuous availability of their technology investments. Mr. Pella excels in trouble-shooting problem HVAC systems and analysis of older, non-documented systems. F | Page 26 Absolute Civil Engineering Solutions, LLC 4121 SW 47th Avenue, Suite 1319, Davie, FL 33314 Wayne Webb, P.E. Vice President/Principal Engineer Awarded "2014 Engineer of the Year by the Broward County Building Officials Association", Mr. Wayne Webb currently serves as the Vice President and Principal Engineer of Absolute Civil Engineering Solutions, LLC. Since the inception of his career 26 years ago, Mr. Webb has spent the last decade successfully managing a variety of civil, geotechnical, environmental, and structural engineering and testing contracts within the State of Florida. His focus has been providing materials engineering construction and construction materials testing/inspection services for a wide range of projects such as schools, ports, hotels, office buildings, parking structures, large mixed-use developments, and transportation projects. He most recently served as the Private Provider responsible for the Building, Structural, Mechanical, Electrical, Plumbing Code Compliance Plan Review and Inspections for the Met II Hotel and Office Towers located in the City of Miami, which is the largest Private Provider project to date. Mr. Webb’s other relevant experience includes providing civil engineering, building envelope evaluations, infrastructure evaluations, roof testing and design, property condition assessments, forensic testing and evaluations, and engineering consulting services. In addition, Mr. Webb has performed a variety of environmental engineering services including environmental site assessments (Phase I and Phase II ESA’s), contamination assessment reports, tank closure reports, remedial action plans, compliance audits and monitoring only plans (MOP). He is a recognized leader in the assessment of water-entry problems in both residential and commercial buildings. Mr. Webb has performed hundreds of inspections for both builders and homeowners to determine either if moisture entry has occurred or to wha t extent the moisture entry has affected the building. Specific recommendations are made based on these assessments for corrective action or remediation. He also performs framing - stage and pre-closing inspections of homes and high-rises for major builders as a way to prevent certain water-entry problems from occurring and consults with these builders for any applicable water-entry issues. REPRESENTATIVE PROJECT EXPERIENCE: Retail: • Walgreens, Hialeah, Florida • South Dade Shopping Center, Miami, Florida • Arch Creek Shopping Center, Miami, Florida • Macy’s at Pembroke Lakes, West Palm Beach, Florida • Badcock Furniture, Aventura, Florida • Sterling Town Center, Fort Lauderdale, Florida Residential Development: • The Preserve, Coconut Creek, Florida • Chapel Trail, Pembroke Pines, Florida • Enclave @Doral, Miramar Lakes, Florida EDUCATION: MPH research Studies, University of the West Indies, 1985-1988 B.S.C.E., University of the West Indies, 1984 CERTIFICATIONS / REGISTRATIONS: • Registered professional Engineer, State of Florida, 56701 AFFILIATIONS: • Florida Engineering Society • American Concrete Institute • American Society of Civil Engineers • Deep Foundation Institute F | Page 27 4121 SW 47th Avenue, Suite 1319, Davie, FL 33314 WAYNE WEBB’S REPRESENTATIVE PROJECT EXPERIENCE (cont’d) Education: • Florida International University, Miami, Florida • Gilbert Porter Elementary School, Miami, Florida • North Miami Senior High School, Miami, Florida • University of Miami, Coral Gables, Florida • Miami-Dade College, Miami, Florida • St. Brendan High School, Miami, Florida Apartment/Condominiums: • Ocean One, Miami, Florida • Ocean Two, Miami, Florida • Ocean Three, Miami, Florida • Trump Tower I, II, III, Miami, Florida • Icon Brickell, Miami, Florida • 50 Biscayne, Miami, Florida • La Costa Apartments, Boca Raton, Florida • Royal Pointe Town Villas, Miami, Florida • Ibis Villas, Miami Gardens, Florida • Seaside Residences, Key West, Florida • Club West St. Andrews @ Kings Point, Delray, Florida Municipalities/Government: • Miami Dade County, Florida • City of Sunrise, Florida • City of Plantation, Florida • City of Hollywood, Florida • City of Coral springs, Florida • City of Fort Lauderdale, Florida • City of Miami Beach, Florida • City of Coral Gables, Florida • City of Miami, Florida Office: • General Funding Building, Coral Gables, Florida • Met 2 Office Tower, Miami, Florida • Perez Office Building, Fort Lauderdale, Florida • Esplanade Medical Center, Miami, Florida • Exxon Silver Bluff Corporate Park, Miami, Florida Hotel: • Met 2 Hotel Tower, Miami, Florida • Ritz Carlton, The Cayman Islands • Holiday Inn Express, Miami, Florida • Victor Hotel, Miami Beach, Florida F | Page 28 ANDRES GARCIA, ULM Utility Location Manager, ULM InfraMap Corp - West Palm Beach, Florida EDUCATION Palm Beach State College, Associates in Science TRAINING InfraMap Training Program for Utility Locating & Designating Certification/Instructor ATSSA, Traffic Control Supervisor Certification, August 2000 Confined Space Entry Training Program Certification (OSHA 1910.146) FUCC Utility Coordination Discussion Seminar Regular Attendee CSX Roadway Worker Protection Annual Certification KEY QUALIFICATIONS Mr. Garcia has performed utility locating assignments for InfraMap Corp in Florida, Virginia, Maryland, Georgia and Alabama since 1998. He currently is a Senior Utility Location Manager and is proficient with utility designating, performing test holes and utility CADD. Mr. Garcia’s responsibilities include utility designation and test hole project management, attending utility scoping meetings, obtaining permits, records research, traffic control supervision, field data collection, quality control of the field work and FDOT Standards Compliance for each delivered submittal. His duties also include vacuum excavation equipment maintenance. Mr. Garcia has excelled as a survey party chief with experience in Total Station survey and data collector knowledge (electronic field book, TDS functions, and three wire bench runs and GPS/RTK on several designating and utility locating projects). His assistance in the survey EFB data collection compliance further adds to InfraMap’s knowledge and experience. His role as Senior Utility Location Manager is obtaining utility records and ROW permits, QA/QC, supervisory of field crews, meeting with utility company personnel and Maintenance of Traffic (MOT) set up. PROJECT EXPERIENCE FDOT District 4 - District-Wide Utility Locating Services Contract # C-9161 (April 18, 2011 - Current): InfraMap has provided utility designating, air/vacuum test holes, survey and EFB/CAiCE/MicroStation CADD on highway projects in District 4 in support of the District’s pre-design program through private consultants and in-house design program. InfraMap has had a district-wide utility locating contracts since 1996. Reference: Mr. Jeff Smith, District Surveyor (954) 777-4579 FDOT District 4 – District-Wide Survey Services Contract # C9906 (December 2012 – December 2017) InfraMap provides utility designating, air/vacuum test holes, and EFB/CAiCE/MicroStation CADD on survey projects. We are a sub-consultant to Bowman Consulting. Reference: Mr. Adam Dao, PSM (772) 283-1413 FDOT District 4 – District-Wide Survey Services Contract # C9160 (June 2015 – December 2020) InfraMap provides utility designating, air/vacuum test holes, and EFB/CAiCE/MicroStation CADD on survey projects. We are sub-consultant to Biscayne Engineering Inc. Reference: Mr. Mik e Bartholomew, President (305) 324-7671 FDOT District 4 – Designating Services for Port Saint Lucie Contract # C9161 (February 2015 – February 2025) InfraMap provides utility designating, air/vacuum test holes, and EFB/CAiCE/MicroStation CADD on this designating project in District 4. InfraMap is a sub-consultant to American Consulting Engineers of Florida, LLC. Reference: Mr. Christopher O’Reilly, PE (561) 253-9563 FDOT District 6 District-Wide Utility Locating Services Contract # C-9C12 (July 25, 2013 - Current): InfraMap has provided utility designating, air/vacuum test holes, survey and EFB/CAiCE/MicroStation CADD on highway projects in District 6 in support of the District’s pre-design program through private consultants and in-house design program. InfraMap has had consecutive district-wide utility locating contracts since 1997. Reference: Mr. Tony Soto, Project Manager (305) 470-5232 F | Page 29 Masuen Consulting. LLC Design • Consult • Manage JUDY JENSEN Water Resource Consultant Ms. Jensen’s responsibilities include training new designers, water conservation consulting, LEED consulting and design, irrigation design, & project design coordination. Years with Masuen: 13 Years EDUCATION / PROFESSIONAL o Associate of Arts in General Education, (with Honors), Daytona State College, 2003 o Associate of Applied Science in Architectural & Building Technology, (with Honors), Advanced Technology Center at Daytona State College, 2005 o Certified Landscape Irrigation Auditor (CLIA) - Irrigation Association, 2006 o Certified Golf Irrigation Auditor (CGIA) - Irrigation Association, 2008 o US Green Building Council LEED AP, 2008 o Certified Irrigation Designer, Commercial, 2011 PROJECTS o Port St Lucie Botanical Gardens, Port St Lucie, Florida o Brickell Park, Miami, Florida o 44th Street Park, Sunrise, Florida o 66th Avenue, Vero Beach, Florida o State Road 5, Fort Pierce & Delray Beach, Florida o 1111 Lincoln Road Penthouse, Miami, Florida o Apogee, Miami, Florida o Jade Signature, Sunny Isles, Florida o Century Village East, Deerfield Beach, Florida o Talmadge Lofts, Savannah, Georgia o Broward County Convention Center (LEED), Broward County, Florida o Element Hotel (LEED), Miami, Florida o Headquarters Honda (LEED), Clermont, Florida o Nova Southeastern University Oceanic Center (LEED), Dania Beach, Florida o City Furniture (LEED), Cutler Bay, Florida o Perry Hotel Remodel (LEED), Miami, Florida PROFESSIONAL ORGANIZATIONS: o Corporate Member of United States Green Building Council (USGBC) o Professional Member of The Irrigation Association (IA) o WaterSense Partner F | Page 30 S e c t i o n G C o r p o r a t e S t a n d i n g a n d A u t h o r i z e d S i g n a t o r y State of Florida Department of State I certify from the records of this office that CRAVEN, THOMPSON & ASSOCIATES, INC. is a corporation organized under the laws of the State of Florida, filed on January 1, 1962. The document number of this corporation is 254407. I further certify that said corporation has paid all fees due this office through December 31, 2018, that its most recent annual report/uniform business report was filed on January 16, 2018, and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee, the Capital, this the Sixteenth day of January, 2018 Tracking Number: CC1640127508 To authenticate this certificate,visit the following site,enter this number, and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication G | Page 1 3563 NW 53RD STREET FORT LAUDERDALE, FL 33309 Current Principal Place of Business: Current Mailing Address: 3563 NW 53RD STREET FORT LAUDERDALE, FL 33309 Entity Name:CRAVEN, THOMPSON & ASSOCIATES, INC. DOCUMENT# 254407 FEI Number: 59-0948029 Certificate of Status Desired: Name and Address of Current Registered Agent: MCDONALD, THOMAS MICHAEL 3563 NW 53RD ST FT LAUDERDALE, FL 33309 US The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both, in the State of Florida. SIGNATURE: Electronic Signature of Registered Agent Date Officer/Director Detail : I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under oath; that I am an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607, Florida Statutes; and that my name appears above, or on an attachment with all other like empowered. SIGNATURE: Electronic Signature of Signing Officer/Director Detail Date THOMAS M MCDONALD FILED Jan 16, 2018 Secretary of State CC1640127508 THOMAS MICHAEL MCDONALD PRESIDENT 01/16/2018 2018 FLORIDA PROFIT CORPORATION ANNUAL REPORT Yes 01/16/2018 Title DPT Name MCDONALD, THOMAS Address 7630 MARBLEHEAD LANE City-State-Zip: PARKLAND FL 33067 Title V Name PRYCE, RICHARD Address 13901 SW 26TH STREET City-State-Zip: DAVIE FL 33326 Title V, SECRETARY Name HANDLEY, JOSEPH D Address 3470 NE 17TH TERRACE City-State-Zip: OAKLAND PARK FL 33334 Title VP Name GIBNEY, PATRICK J Address 3563 NW 53RD STREET City-State-Zip: FORT LAUDERDALE FL 33309 G | Page 2 T a b 8 M i s c e l l a n e o u s S e c t i o n H V a r i a t i o n s / E x c e p t i o n s CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION H - VARIATIONS / EXCEPTIONS VARIATIONS / EXCEPTIONS All Professional Services that Craven Thompson & Associates, Inc. (CTA) provides are listed in Section E – Qualification Information and Assigned Personnel. CTA has no variations or exceptions to any section of the proposal. H | Page 1 S e c t i o n I L i t i g a t i o n S t a t e m e n t CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION I – LITIGATION STATEMENT LITIGATION STATEMENT The following is a list of litigation matters in the past five (5) years: Case No.: Palm Beach County Case No. 502013CA007785XXXXMBAJ Date: Case filed June 4, 2013 / Dismissed February 2015 Case No.: Palm Beach County Case No. 502016CA006688XXXXMB Date: Case re-opened March 2017– Case Settled September 2017 Monetary Amount Involved: $15,000.00 Position: Defendant Name of Case: The Edge No. One Condominium Association, Inc. vs. The Edge Investors, L.P.; Coastal Construction of South Florida, Inc.; Trans Coastal Construction Company; Steven Feller, P.E., P.L.; Cohen, Freedman, Encinosa & Associates-Architects, P.A.; CHM Consulting Engineers, Inc.; Craven Thompson & Associates, Inc. Explanation: Plaintiff claimed unspecified problems with the building. It was unclear what civil engineering issues were relevant. The contractor, architect and the entire design team were defendants. Date: Case filed June 9, 2015 / Settled December 9, 2016 Monetary Amount Involved: $150,000 (Giannetti Contracting - $120,000, Craven Thompson - $30,000) Case No.: Broward County Case No. 14-002381 (21) Name of Case: Broward County Case No. 14-002381 (21) - Randy Ezekowitz vs. Giannetti Contracting Corporation, E&N Construction, Inc., Asphalt Milling Services, Inc., Bon's Barricades, Inc., Florida Department of Transportation, Craven Thompson & Associates, Inc. and Transfield Services Infrastructure, Inc. Explanation: Plaintiff claims that CTA failed to warn motorists of the difference in elevation of pavement. Plaintiff did not specify a specific claim related to Civil Engineering. Date: Case filed Sept. 11, 2011 / Dismissed October 18, 2013 Monetary Amount Involved: None. Case No.: Palm Beach County Case No. 502011CA014555XXXXMB Case Name: Darlene Cookish vs. Craven Thompson & Associates, Inc. Explanation: No complaint was ever filed. CTA only received a summons for information. The incident did not involve any of our projects. It involved a project next door. Nothing involved Craven Thompson. When this was explained to the plaintiff’s attorney, no further action was taken on their part. The statute of limitations has since passed. I | Page 1 S e c t i o n J F o r m s a n d A t t a c h m e n t s CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION J - FORMS AND ATACHMENTS PROJECT NAME North County Neighborhood Improvement Project, Northeast Quadrant, Bid Package 11 Pompano Beach, Florida CLIENT Mr. Patrick MacGregor Expansion Coordinator Broward County Water and Wastewater Services 2555 West Copans Road Pompano Beach, Florida 33069 Phone: (954) 831-0904 Email: pamacgregor@broward.org PROJECT START DATE Design: November 2009 Construction: October 2011 PROJECT COMPLETION DATE Design: February 2011 Construction: 2014 ENGINEER’S ESTIMATED CONSTRUCTION COST $23,033,142.00 ACTUAL CONSTRUCTION COST $17,608,000.00 PROJECT SUMMARY The infrastructure improvements to the existing neighborhood included new roadway, sidewalk drainage, swale regrading, landscaping, water, sanitary sewer, and signage, Bid Package 11 was the final area in the North County Neighborhood Improvement, NE Quadrant. The area is primarily residential that was developed in the 1950’s. The existing infrastructure was longer suitable to meet the current standards for water and sanitary sewer facilities. The Project was completed under budget and on time. The North County Neighborhood Improvement Project (NCNIP) Northeast Quadrant, Bid Package 11 included approximately 357 acres of land between Dixie Highway and Federal Highway, north of Sample Road in Broward County. The project included over 50,688 linear feet of new roadway construction, sidewalks, driveway aprons, and sodded swales In addition the project included over 14,777 linear feet of new storm sewer, 12,993 linear feet of exfiltration trench, 64,000 linear feet of water main, 553 Water Services (many of these services were moved from the rear of the lot to the front), 49,700 linear feet of reuse water main, 796 reclaimed water services, 43,805 linear feet of gravity sewer main, 750 sewer laterals, lift station, and 1,630 linear feet of force main. CTA provided surveying, civil engineering, landscape architecture and CEI services on the project. J | Page 3 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION J - FORMS AND ATACHMENTS PROJECT NAME Garden Acres Neighborhood Improvements Oakland Park, Florida OWNER / CLIENT Ms. Jennifer Frastai, ICMA-CM Director of Engineering & Community Development City of Oakland Park 5399 N. Dixie Highway, Suite 3 Oakland Park, Florida 33334 Phone: (954) 630-4477 Email: Jenniferf@oaklandparkfl.gov PROJECT COMPLETION DATE Design: 2012 - 2013 Construction: 2013 - 2014 CTA FEES $195,069.00 FINAL CONSTRUCTION COST $2,644,372.00 (4 Change Orders) PROJECT SUMMARY Garden Acres was a single-family residential neighborhood approximately with an area of approximately 24 acres. The new drainage system consists of 4” deep roadway swales, drainage pipes and structures, exfiltration trenches and two controlled discharge points into an existing drainage system located within the NE 6th Avenue right-of-way. The roadway swales help with the storage and convey the runoff from the roadway and the house lots. The swales and exfiltration trenches handle the water quality volume generated by the roadway right-of-way area. CTA analyzed the system using ICPR software. CTA provided design, permitting and CEI services for the project. The roadway restoration consisted of 4,985 linear feet of roadway. The drainage system consisted of 2,136 linear feet of storm sewer, 4,171 linear feet and of exfiltration trench. The project also included major roadway, water and sanitary sewer improvements. The water improvements consisted of 5,591 linear feet of 6” diameter main, and 962 linear feet of 8” diameter main. The sanitary improvements consisted of 7,045 linear feet of 8” diameter sewer, 218 linear feet of 4” diameter forcemain, and 1,044 linear feet of 6” diameter forcemain. Improvements included two lift stations. J | Page 4 CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 SECTION J - FORMS AND ATACHMENTS PROJECT NAME City of Miami Gardens Livable Neighborhood Project Miami Gardens, Florida CLIENT Mr. Tom Ruiz, Director of Public Works City of Miami Gardens 1050 NW 163rd Drive Miami Gardens, Florida 33169 Phone: (786) 279-1260 Email: truiz@miamigardens-fl.gov PROJECT START / COMPLETION DATE August 2009 - Ongoing EST. CONSTRUCTION BUDGET $6,683,87.00 ENGINEER’S DESIGN BUDGET $902,124.74 SERVICES PROVIDED Craven Thompson & Associates (CTA) provided all of the surveying services, storm water master planning, all civil engineering, all landscape architectural, and construction management for the project. PROJECT SUMMARY The Livable Neighborhoods Improvement Project is subdivided among four separate sites; namely Garden Circle, Kings Garden I & II, Kings Garden III and Vista Verde. The various project sites are all located within the confines of NW 183rd Street (Miami Gardens Drive), NW 215th Street (County Line Road), NW 47th Avenue, and NW 37th Avenue in the City of Miami Gardens, Florida. No storm water quality treatment or quantity attenuation facilities were included in the initial developments, which are apparent through the numerous drainage issues observed. The Livable Neighborhoods Improvement Project includes approximately 222 total acres of land. The project includes: 34,200 linear feet of roadway, 7,840 linear feet of sidewalk, 19,000 linear feet of storm sewer, 151 drainage structures, the regrading of 22,500 linear feet of swales, and the addition of 112 street lights, along with street trees and landscape/hardscape. J | Page 5